Metode Pelaksanaan Tiang Pancang Pada Germaga Sibola

download Metode Pelaksanaan Tiang Pancang Pada Germaga Sibola

of 10

Transcript of Metode Pelaksanaan Tiang Pancang Pada Germaga Sibola

  • 8/17/2019 Metode Pelaksanaan Tiang Pancang Pada Germaga Sibola

    1/10

     

    ME

     

    ALEXSA

    NIM. 100

     

    ODE PE

    PAD

    NDER M

    5021008

    P

    AKSA

     DERM

    Dituli

    Mata Kuli

    Pendidi

    RPAUN

     

    OGRA

    JURU

    OLITE

    AAN P

    GA NA

    LAPOR

     

    s untuk M

    h Tugas A

    kan Progra

    oleh:

     

    STUDI

    AN TE

    NIK NE

    MED

    201

     ABSTR

    NDASI

    VIGASI

    AN

    nyelesaika

    khir Semes

     Diploma

    LYA

    NIM.

    TEKNI

    NIK SI

    GERI M

    N

    AK

    IANG

    SIBOLG

     

    ter VI

    III 

    CHRISTI

     10050210

     

    SIPIL

    IL

    DAN

    ANCAN

    A

    E D. SIL

    5

    AEN

  • 8/17/2019 Metode Pelaksanaan Tiang Pancang Pada Germaga Sibola

    2/10

     

    METODE PELAKSANAAN PONDASI TIANG PANCANG

    PADA DERMAGA NAVIGASI SIBOLGA

    Pondasi berfungsi untuk meneruskan beban struktur diatas lapisan tanah bawah. Salah satu jenis pondasi adalah pondasi tiang pancang. Pekerjaan pondasi

    tiang pacang memerlukan meode pelaksanaan, agar terbentuknya konstruksi yang

     baik untuk nantinya digunakan. Salah satu unsur yang akan dibahas dalam

    Laporan Tugas Akhir ini adalah metode pelaksanaan pondasi tiang pacang.

    Pondasi tiang Pondasi tiang pancang (pile foundation) adalah bagian dari struktur

    yang digunakan untuk menerima dan mentransfer (menyalurkan) beban dari

    struktur atas ketanah penunjang yang terletak pada kedalaman tertentu. Pondasi

    tiang pancang merupakan perkerjaan dasar yang menentukan bagaimana kuatnya

    struktur yang akan ditahan oleh pondasi dibawah. Oleh karena itu dibutuhkan

    metode pelaksanaan pondasi tiang pancang yang baik. Inilah yang mendorong

     penulis memilih topik bahasan laporan ini. Penulis sengaja memilih topik ini,

    karena data yang dibutuhkan sesuai dengan topik yang dapat diperoleh dari pihak

    kontraktor dan penulis merasa mampu melakukannya. Topik bahasan ini dititik

     beratkan pada pengamatan pelaksanaan pemancangan. Tujuan penulisan laporan

    ini adalah untuk mengetahui sejauh mana metode pelaksanaan pemasangan

     pondasi tiang pancang pada dermaga navigasi Sibolga. Laporan tugas akhir ini

    diharapkan bermanfaat untuk menambah pengetahuan penulis setelah bekerja atau

    terjun kelapangan. Teknik pengumpulan data dilakukan dengan cara: meninjau

    langsung Proyek Dermaga Navigasi Sibolga, melakukan studi kepustakaan,

    konsultasi dengan pihak perusahaan yang mengelola proyek dan konsultasi

    dengan dosen pembimbing. Hasil tinjauan yang didapat bahwa PT.

    PINANGRANTI PERDANA sudah memiliki metode pelaksanaan pondasi tiang

     pancang. Penggunaan metode yang tepat, praktis, cepat dan aman, sangatmembantu dalam penyelesaian pekerjaan pada suatu proyek konstruksi. Sehingga

    target waktu, biaya dan mutu sebagaimana ditetapkan dapat tercapai. Disarankan

    untuk tetap memperhatikan seluruh tiang tidak rusak, dan ujung tiang baja benar-

     benar runcing dan tertutup rapat.

    Kata kunci : Metode Pelaksanaan Pondasi

  • 8/17/2019 Metode Pelaksanaan Tiang Pancang Pada Germaga Sibola

    3/10

     

    KATA PENGANTAR

    Puji syukur kepada Tuhan Yang Maha Esa atas rahmat dan kasih-Nya

    memberikan pengetahuan, pengalaman, kekuatan, dan kesempatan kepada

     penulis, sehingga mampu ,menyelesaikan Tugas Akhir ini dengan baik.

    Penulisan Tugas Akhir ini adalah salah satu syarat yang harus dipenuhi untuk

    menyelesaikan pendidikan program Diploma III Politeknik Negeri Medan, dengan

     judul Metode Pelaksanaan Pondasi Tiang Pancang Pada Dermaga Navigasi

    Sibolga.

    Dalam menyelesaikan Tugas Akhir ini, penulis mengalami masalah dan

    hambatan, namun berkat bimbingan dan bantuan dari berbagai pihak, maka

     penulisan Tugas Akhir ini dapat diselesaikan dengan baik.

    Atas bantuan yang penulis terima dengan ketulusan hati, pada kesempatan ini

     penulis mengucapkan terima kasih kepada:

    1. 

    Bapak M. Syahruddin, S.T. M.T, selaku Direktur Politeknik Negeri Medan;

    2.  Bapak Abdul Basir, S.T. M.T, selaku Pudir I Politeknik Negeri Medan;

    3. 

    Bapak Abdul Rahman, selaku Pudir II Politeknik Negeri Medan;

    4.  Ibu Delisma Siregar, S.T. M.T, selaku Pudir III Politeknik Negeri Medan;

    5. 

    Bapak Drs. Syaiful Hazmi, M.T, selaku Ketua Jurusan Teknik Sipil

    Politeknik Negeri Medan;

    6. 

    Bapak Ir. Sudarto, M.T, selaku Kepala Program Studi Teknik Sipil.

    7. 

    Bapak Ir. Samsudin Silaen, M.T, selaku Dosen Pembimbing, yang telah

    meluangkan waktu kepada penulis dalam penulisan Tugas Akhir kami;

    8.  Bapak Sopar Parulian Sihombing, S.T, M.T, selaku Wali Kelas SI-6A;

    9.  Seluruh staf pengajar Politeknik Negeri Medan yang telah berjasa dalam

    mendidik dan memberikan keterampilan kepada penulis.

    10.  Seluruh pihak dari PT. Pinangranti Perdana

    11.  Bapak Samiran, SST, selaku Site Manager PT. Pinangranti Perdana;

    12.  Bapak Hendrik Siahaan, selaku pembimbing lapangan dan alumnus

    Politeknik Negeri Medan;

    13.  Orangtua serta keluarga penulis yang telah memberikan dorongan moral dan

    material sehingga penulis dapat menyelesaikan Tugas Akhir.

  • 8/17/2019 Metode Pelaksanaan Tiang Pancang Pada Germaga Sibola

    4/10

     

    14.  Tercinta Michael Siringo Ringo yang selalu memberikan motivasi dan

    dorongan kepada penulis.

    15. 

    Teman-teman khususnya SI-6A yang telah ikut membantu menyelesaikan

    laporan ini.

    Penulis menyadari bahwa masih banyak kekurangan dan kesilapan dalam

    menyusun Laporan Tugas Akhir ini. Oleh karena itu penulis sangat mengharapkan

    kritik dan saran yang bersifat membangun demi menyempurnakan Laporan Tugas

    Akhir ini.

    Akhir kata penulis mengucapkan terima kasih dan berharap semoga laporan

    ini dapat bermanfaat bagi penulis maupun semua pihak yang membacanya,

    terutama yang berkecimbung di dunia pendidikan dalam bidang Teknik Sipil.

    Medan, Agustus 2013

    Hormat kami penulis,

    Alexsander Marpaung Lya Christine D. Silaen

     NIM. 1005021008 NIM. 1005021045

  • 8/17/2019 Metode Pelaksanaan Tiang Pancang Pada Germaga Sibola

    5/10

     

    DAFTAR ISI

    LEMBARAN PERSETUJUAN ................................................................... i

    LEMBAR PENGESAHAN .......................................................................... ii

    LEMBAR PERSEMBAHAN ....................................................................... iii

    ABSTRACK ................................................................................................. iv

    KATA PENGANTAR .................................................................................. v

    DAFTAR ISI ................................................................................................. vii

    DAFTAR TABEL ......................................................................................... ix

    DAFTAR GAMBAR .................................................................................... x

    DAFTAR LAMPIRAN ................................................................................. xii

    BAB I. PENDAHULUAN

    1.1 

    Latar Belakang Pemilihan Judul ....................................................... 1

    1.2 

    Topik Pembahasan ............................................................................ 2

    1.3 

    Tujuan Pembahasan .......................................................................... 2

    1.4 

    Manfaat ............................................................................................. 2

    1.5 

    Teknik Pengumpulan Data ................................................................ 3

    1.6 Jadwal Persiapan, Pelaksanaan, Penulisan Laporan Tugas Akhir .... 3

    BAB II. TINJAUAN UMUM PROYEK

    2.1 

    Latar Belakang Proyek ...................................................................... 5

    2.2 Data Umum Proyek .......................................................................... 5

    2.3 

    Data Khusus Proyek .......................................................................... 6

    2.4 Organisasi Proyek ............................................................................. 6

    2.5 

    Struktur Organisasi Proyek ............................................................... 7

    BAB III. TINJAUAN KEPUSTAKAAN

    3.1 Umum ............................................................................................... 8

    3.1.1 Pondasi Dangkal ..................................................................... 8

  • 8/17/2019 Metode Pelaksanaan Tiang Pancang Pada Germaga Sibola

    6/10

     

    3.1.2 Pondasi Dalam ........................................................................ 8

    3.2 Pondasi Tiang Pancang ..................................................................... 8

    3.2.1 Penggolongan Pondasi Tiang Pancang .................................... 10

    3.2.2 Keuntungan dan Kerugian Menurut Teknik Pemasangan ....... 21

    3.3 Ukuran Tiang Pancang ...................................................................... 23

    3.4 Alat Pancang Tiang ........................................................................... 23

    3.5 Tanah ................................................................................................. 25

    3.5.1 Klasifikasi Tanah ..................................................................... 25

    3.6 Pengaplikasian Beton Dalam Air Laut .............................................. 28

    3.7 Pengelasan ......................................................................................... 29

    BAB IV. PEMBAHASAN

    4.1 Pekerjaan Pemancangan .................................................................... 34

    4.1.1 Perencanaan Pemancangan ...................................................... 34

    4.1.2 Pekerjaan Persiapan ................................................................. 36

    a.Transportasi Alat Pancang..................................................... 36

     b. Transportasi Bahan .............................................................. 37

    c. Penentuan Titik Pemancangan ............................................. 39

    d. Pengelasan ............................................................................ 42

    4.1.3 Metode Pelaksanaan Pemancangan.......................................... 43

    BAB V. KESIMPULAN DAN SARAN

    5.1 Kesimpulan ....................................................................................... 49

    5.2 Saran .................................................................................................. 49

    DAFTAR KEPUSTAKAAN

    LAMPIRAN-LAMPIRAN

  • 8/17/2019 Metode Pelaksanaan Tiang Pancang Pada Germaga Sibola

    7/10

     

    DAFTAR TABEL

    1.  Jadwal Laporan Tugas Akhir .................................................................. 3

    2.  System Klasifikasi Tanah AASHTO ...................................................... 27

    3. 

    Jadwal Pemancangan Tiang Dermaga Navigasi Sibolga ........................ 47

  • 8/17/2019 Metode Pelaksanaan Tiang Pancang Pada Germaga Sibola

    8/10

     

    DAFTAR GAMBAR

    1.  Gambar 3.1 Pengelasan Lebur ................................................................ 31

    2.  Gambar 3.2 Lima Jenis Sambungan Yang Biasa Digunakan Dalam

    Proses Pengelasan .............................................................. 33

    3.  Gambar 4.0 Crane Sampai Di Lokasi Proyek ......................................... 36

    4. 

    Gambar 4.1 Tongkang Yang Membawa Alat Pancang Sampai Di

    Lokasi Proyek .................................................................... 36

    5. 

    Gambar 4.2 Crane Dinaikkan Ke Dalam Tongkang ............................... 37

    6.  Gambar 4.3 Transportasi Alat Pancang Menggunakan Kapal Ponton/

    Tongkang ............................................................................. 37

    7.  Gambar 4.4 Proses Bongkar Muat Tiang Dari Truk Untuk Kemudian

    Ditumpuk Di Lokasi Proyek .............................................. 38

    8.  Gambar 4.5 Pengangkatan Tiang Dilakukan Menggunakan Forklift

    Truck .................................................................................. 38

    9.  Gambar 4.6 Pengangkatan Tiang Ke Lokasi Pemancangan ................... 38

    10. 

    Gambar 4.7 Posisi Titik Patok ................................................................ 39

    11. 

    Gambar 4.7.1 Cara Penentuan Posisi Titik Pemancangan di Laut .......... 41

    12. 

    Gambar 4.8 Proses Pengelasan Untuk Menyambung 2 Buah Tiang ...... 42

    13. Gambar 4.9 Hasil Pengelasan Tahap Awal ............................................. 42

    14. 

    Gambar 4.10 Sambungan Tambahan Berupa Plat .................................. 42

    15. Gambar 4.11 Mengarahkan Tiang Ke Titik Dimana Akan Dilakukan

    Pemancangan .................................................................. 43

    16. Gambar 4.12 Pemasangan Helmet Ke Kepala Tiang Pancang .............. 44

    17. 

    Gambar 4.13 Pengangkatan Tiang Hingga Vertical Dengan Tali

    Pengikat Tiang ................................................................ 44

    18. 

    Gambar 4.14 Tiang Pancang Baru Diangkat Sampai Elevasi Ujung

    Tiang Yang Sudah Terpancang Sama Dengan UjungBawah Tiang Baru .......................................................... 45

    19. Gambar 4.15 Proses Setting Kedudukan Tiang Agar Kedua Tiang

    Bertemu ........................................................................... 45

    20. 

    Gambar 4.16 Pengelasan Kedua Tiang .................................................. 46

  • 8/17/2019 Metode Pelaksanaan Tiang Pancang Pada Germaga Sibola

    9/10

     

    21. Gambar 4.17 Pemasangan Tulangan Diantara Tiang Baja Dan

    Bekisting ....................................................................................................... 46

    22. 

    Gambar 4.18 Melapisi Pipa Baja Dengan Beton Cor ............................. 47

  • 8/17/2019 Metode Pelaksanaan Tiang Pancang Pada Germaga Sibola

    10/10

     

    DAFTAR LAMPIRAN

    1. 

    Lampiran 1: Foto-foto Dokumentasi

    2. 

    Lampiran 2: Gambar Proyek