LAPORAN KEUANGAN DANA BLOCK GRANT IMBAL SWADAYA MUTU ( RKB ) SMA NEGERI 1 MANDAI PROVINSI : SULAWESI SELATAN KABUPATEN : MAROS NAMA SEKOLAH : SMA NEGERI 1 MANDAI Periode : JUNI 2007 Penerimaan Pengeluaran (Rp) Tgl Uraian Rp Tgl Uraian Rp No. Bukti Dana Block Grant 150,000,000 20 Biaya Transfer 50,000 Rp 2 Pasir Gowa 2 mobil 800,000 13 Rp 2 Kayu bahan kuseng 12,000,000 14 Rp 2 25 zak semen Tonasa 875,000 15 Rp 2 Upah tukang 2,500,000 16 Rp 3 Pasir Gowa 1 mobil 400,000 17 Rp Batu gunung 2 mobil 550,000 3 25 zak semen Tonasa 875,000 18 Rp 4 Cipping 1 mobil 900,000 19 Rp 5 Tanah timbunan 6 mobil 960,000 20 Rp 5 25 zak semen tonasa 875,000 21 Rp 6 Pasir Gowa 2 mobil 800,000 22 Rp 9 Batu gunung 3 mobil 825,000 23 Rp 9 Upah tukang 2,500,000 24 Rp 11 Pasir gowa 2 mobil 800,000 25 Rp 11 Kaca 10 lembar 950,000 26 Rp 12 Balok 6x12x4m 0,4 m3 720,000 27 Rp Tanah Timbunan 1 mobil 160,000 12 Kaca 10 lembar 950,000 28 Rp 15 Bambu 50 batang 875,000 29 Rp Rotan 2 ikat 60,000 15 Upah tukang 2,500,000 30 Rp 17 Batu gunung 2 mobil 550,000 31 Rp Pasir Gowa 1 mobil 400,000 20 Cipping 1 mobil 900,000 32 Rp 22 Upah Tukang 2,500,000 33 Rp 24 Tanah timbunan 5 mobil 800,000 34 Rp 25 zak semen tonasa 875,000 35 26 Batu gunung 2 mobil 550,000 36 Rp Timbunan 2 mobil 320,000 27 Balok 8x12x4m 0,8 m3 1,440,000 37 Rp Balok 5x10x4m 2,8 m3 5,040,000 Balok 4x6x4m 2,7 m3 4,860,000

Transcript of lpj RKB BLOCKGRAND 2007

Page 1: lpj RKB BLOCKGRAND 2007

LAPORAN KEUANGANDANA BLOCK GRANT IMBAL SWADAYA MUTU ( RKB )

SMA NEGERI 1 MANDAI

PROVINSI : SULAWESI SELATANKABUPATEN : MAROSNAMA SEKOLAH : SMA NEGERI 1 MANDAIPeriode : JUNI 2007

Penerimaan Pengeluaran (Rp)

Tgl Uraian Rp Tgl Uraian RpNo.

JumlahBukti

Dana Block Grant 150,000,000 20 Biaya Transfer 50,000 Rp 50,0002 Pasir Gowa 2 mobil 800,000 13 Rp 800,0002 Kayu bahan kuseng 12,000,000 14 Rp 12,000,0002 25 zak semen Tonasa 875,000 15 Rp 875,0002 Upah tukang 2,500,000 16 Rp 2,500,000

3 Pasir Gowa 1 mobil 400,000 17 Rp 950,000Batu gunung 2 mobil 550,000

3 25 zak semen Tonasa 875,000 18 Rp 875,0004 Cipping 1 mobil 900,000 19 Rp 900,000

5 Tanah timbunan 6 mobil 960,000 20 Rp 960,0005 25 zak semen tonasa 875,000 21 Rp 875,000

6 Pasir Gowa 2 mobil 800,000 22 Rp 800,0009 Batu gunung 3 mobil 825,000 23 Rp 825,0009 Upah tukang 2,500,000 24 Rp 2,500,000

11 Pasir gowa 2 mobil 800,000 25 Rp 800,00011 Kaca 10 lembar 950,000 26 Rp 950,000

12 Balok 6x12x4m 0,4 m3 720,000 27 Rp 880,000Tanah Timbunan 1 mobil 160,000

12 Kaca 10 lembar 950,000 28 Rp 950,00015 Bambu 50 batang 875,000 29 Rp 935,000

Rotan 2 ikat 60,000

15 Upah tukang 2,500,000 30 Rp 2,500,00017 Batu gunung 2 mobil 550,000 31 Rp 950,000

Pasir Gowa 1 mobil 400,000

20 Cipping 1 mobil 900,000 32 Rp 900,00022 Upah Tukang 2,500,000 33 Rp 2,500,00024 Tanah timbunan 5 mobil 800,000 34 Rp 1,675,000

25 zak semen tonasa 875,000 35

26 Batu gunung 2 mobil 550,000 36 Rp 870,000Timbunan 2 mobil 320,000

27 Balok 8x12x4m 0,8 m3 1,440,000 37 Rp 11,340,000Balok 5x10x4m 2,8 m3 5,040,000Balok 4x6x4m 2,7 m3 4,860,000

Page 2: lpj RKB BLOCKGRAND 2007

28 Batu merah 3500 buah 875,000 38 Rp 875,00028 Upah Tukang 2,500,000 39 Rp 2,500,00030 Batu merah 3500 buah 875,000 40 Rp 875,000

Jumlah Penerimaan 150,000,000Jumlah Pengeluaran 54,410,000 Rp 54,410,000

Saldo 95,590,000 95,590,000

Jumlah 150,000,000 Jumlah 150,000,000 150,000,000

Rincian:JUMLAH PENERIMAAN : Rp. 150,000,000JUMLAH PENGELUARAN : Rp. 54,410,000SALDO BUKU : Rp. 95,590,000

Tanggal , 30 Juni 2007Kepala SMA Negeri 1 Mandai Bendahara,

Drs. BAHARUDDIN TASIK LAYUK, S.PdNIP 131 600 053

Page 3: lpj RKB BLOCKGRAND 2007

LAPORAN KEUANGANDANA BLOCK GRANT IMBAL SWADAYA MUTU ( RKB )

SMA NEGERI 1 MANDAI

PROVINSI : SULAWESI SELATAN

KABUPATEN : MAROS

NAMA SEKOLAH : SMA NEGERI 1 MANDAI

Periode : JULI 2007

Penerimaan Pengeluaran (Rp)

Tgl Uraian Rp Tgl Uraian RpNo.

JumlahBukti

1 Saldo buku per 95,590,000 2 Pasir Gowa 2 mobil 800,000 41 Rp 800,00030 Juni 2007 2 25 zak semen tonasa 875,000 42 Rp 875,000

3 Batu merah 3500 buah 875,000 43 Rp 875,0003 25 zak semen tonasa 875,000 44 Rp 875,0003 Upah kuseng 11,100,000 45 Rp 11,100,000

5 Keramik putih 30x30 200 dos 6,000,000 46 Rp 9,000,000Eternik 1x1m 100 lembar 3,000,000

6 Baut 14 panjang 20cm 35 btng 672,500 47 Rp 912,500Baut 14 panjang 15cm 20 btng 240,000

6 Upah Tukang 2,500,000 48 Rp 2,500,000

8 Behel U 2 set 50,000 49 Rp 250,000Behel U 8 set 100,000Paku 5 cm 5 kg 50,000Paku 4 cm 5 kg 50,000

10 Pasir gowa 800,000 50 Rp 800,00011 Batu gunung 3 mobil 825,000 51 Rp 825,000

11 Tanah timbunan 3 mobil 480,000 52 Rp 880,000Pasir gowa 1 mobil 400,000

12 Batu merah 3500 buah 875,000 53 Rp 875,00012 Tanah timbunan 5 mobil 800,000 54 Rp 800,00012 Batu merah 3500 buah 875,000 55 Rp 875,000

13 Tanah Timbunan 5 mobil 800,000 56 Rp 980,000Skopang 4 buah 180,000

13 Upah Tukang 2,500,000 57 Rp 2,500,00014 Pasir Gowa 2 mobil 800,000 58 Rp 800,000

15 Pasir gowa 1 mobil 400,000 59 Rp 950,000Batu gunung 2 mobil 550,000

15 25 zak semen tonasa 875,000 60 Rp 875,000

Page 4: lpj RKB BLOCKGRAND 2007

17 Pasir gowa 2 mobil 800,000 61 Rp 800,00017 25 zak semen tonasa 875,000 62 Rp 875,000

20 Seng 10 kaki 220 lembar 11,500,000 63 Rp 11,500,00020 Upah tukang 2,500,000 64 Rp 2,500,00021 Seng licin 10 lembar 650,000 65 Rp 887,500

Paku seng 5 dos 237,500

21 Upah Tukang 2,500,000 66 Rp 2,500,00021 Batu merah 3500 buah 875,000 67 Rp 875,00021 20 zak semen tonasa 700,000 68 Rp 700,000

22 Paku 10 kg 100,000 69 Rp 662,500Paku 10 kg 100,000Paku 10 kg 100,000Paku Elektrik 137,500Recas 30,000Pipa paralon 150,000Sambungan 30,000Lem pipa PVC 15,000

23 Residu 6 kaleng 570,000 70 Rp 570,00023 Batu merah 3500 buah 875,000 71 Rp 875,00024 Tanah timbunan 480,000 72 Rp 480,000

24 Batu merah 3000 buah 750,000 73 Rp 910,000Tanah Timbunan 1 mobil 160,000

24 20 zak semen tonasa 700,000 74 Rp 700,00024 Papan Les plafon 70 lembar 770,000 75 Rp 930,000

Tanah timbunan 1 mobil 160,000

24 Pasir gowa 2 mobil 800,000 76 Rp 800,000

25 Pasir gowa 1 mobil 400,000 77 Rp 880,000Tanah Timbunan 3 mobil 480,000 78

25 Papan les plafon 38 lembar 950,000 79 Rp 950,000

26 Cat tembok 7 pail 875,000 80 Rp 935,000Kuas roll 4 buah 60,000

26 20 zak semen tonasa 875,000 81 Rp 875,000

27 Cat AVIAN 30 kaleng 885,000 82 Rp 910,000Kuas 3 cm 4 buah 25,000

27 Plamor Boyo 4 pail 217,500 83 Rp 985,500Cape Dempul 2 kaleng 50,000Meni kayu 8 kaleng 340,000Kertas gosok 10 lembar 120,000Minyak cat 12 kaleng 210,000Doc Balon 6 buah 48,000

29 Plamor Boyo 5 pail 362,500 84 Rp 597,500Cat AVIAN 5 kaleng 147,500Minyak cat 5 liter 87,500

Page 5: lpj RKB BLOCKGRAND 2007

29 Batu merah 2500 buah 625,000 85 Rp 625,000

30 Engsel jendela 32 pasang 368,000 86 Rp 768,000Grendel kodok 32 pasang 240,000Hak angin 32 pasang 160,000

30 Engsel pintu 10 pasang 220,000 87 Rp 401,500Grendel kodok 4 pasang 30,000Kunci pintu 2 pasang 151,500

31 Cat tembok 2 pail 250,000 88 Rp 250,00030 Upah tukang 2,500,000 89 Rp 2,500,000

Jumlah Penerimaan 95,590,000Jumlah Pengeluaran 75,590,000 Rp 75,590,000Saldo 20,000,000 Rp 20,000,000

Jumlah 95,590,000 Jumlah 95,590,000 Rp 95,590,000

Rincian:JUMLAH PENERIMAAN : Rp. 95,590,000JUMLAH PENGELUARAN : Rp. 75,590,000SALDO BUKU : Rp. 20,000,000

Tanggal , 30 Juli 2007Kepala SMA Negeri 1 Mandai Bendahara,

Drs. BAHARUDDIN TASIK LAYUK,S.PdNIP 131 600 053

Page 6: lpj RKB BLOCKGRAND 2007

LAPORAN KEUANGANDANA BLOCK GRANT IMBAL SWADAYA MUTU ( RKB )

SMA NEGERI 1 MANDAI

PROVINSI : SULAWESI SELATANKABUPATEN : MAROSNAMA SEKOLAH : SMA NEGERI 1 MANDAIPeriode : AGUSTUS 2007

Penerimaan Pengeluaran (Rp)

Tgl Uraian Rp Tgl Uraian RpNo.

JumlahBukti

1 Saldo Buku 20,000,000 12 Mobiler 20,000,000 90 Rp 20,000,000per 30 Juli 2007

Jumlah Penerimaan 20,000,000Jumlah Pengeluaran 20,000,000 Rp 20,000,000

Saldo 0 Rp 0

Jumlah 20,000,000 Jumlah 20,000,000 Rp 20,000,000

Rincian:JUMLAH PENERIMAAN : Rp. 20,000,000JUMLAH PENGELUARAN : Rp. 20,000,000SALDO BUKU : Rp. 0

Tanggal , 30 Agustus 2007Kepala SMA Negeri 1 Mandai Bendahara,

Drs. BAHARUDDIN TASIK LAYUK,S.PdNIP 131 600 053

Page 7: lpj RKB BLOCKGRAND 2007

BUKU KASPENERIMAAN DAN PENGELUARAN

DANA BLOCK GRANT IMBAL SWADAYA MUTU ( RKB )SMA NEGERI 1 MANDAI

Bulan : JUNI 2007

Penerimaan Pengeluaran (Rp)No. Jumlah Tgl Uraian No. Jumlah SaldoBukti Bukti

Dana Block Grant 150,000,000 20 Biaya Transfer 50,000 149,950,0002 Pasir Gowa 2 mobil 13 800,000 149,150,0002 Kayu bahan kuseng 14 12,000,000 137,150,0002 25 zak semen Tonasa 15 875000 136,275,0002 Upah tukang 16 2,500,000 133,775,0003 Pasir Gowa 1 mobil 17 400,000 133,375,000

Batu gunung 2 mobil 550,000 132,825,0003 25 zak semen Tonasa 18 875,000 131,950,0004 Cipping 1 mobil 19 900,000 131,050,0005 Tanah timbunan 6 mobil 20 960,000 130,090,0005 25 zak semen tonasa 21 875,000 129,215,0006 Pasir Gowa 2 mobil 22 800,000 128,415,0009 Batu gunung 3 mobil 23 825,000 127,590,0009 Upah tukang 24 2,500,000 125,090,000

11 Pasir gowa 2 mobil 25 800,000 124,290,00011 Kaca 10 lembar 26 950,000 123,340,00012 Balok 6x12x4m 0,4 m3 27 720,000 122,620,000

Tanah Timbunan 1 mobil 28 160,000 122,460,00012 Kaca 10 lembar 29 950,000 121,510,00015 Bambu 50 batang 30 875,000 120,635,000

Rotan 2 ikat 60,000 120,575,00015 Upah tukang 31 2,500,000 118,075,00017 Batu gunung 2 mobil 32 550,000 117,525,000

Pasir Gowa 1 mobil 400,000 117,125,00020 Cipping 1 mobil 33 900,000 116,225,00022 Upah Tukang 34 2,500,000 113,725,00024 Tanah timbunan 5 mobil 35 800,000 112,925,00024 25 zak semen tonasa 36 875,000 112,050,00026 Batu gunung 2 mobil 37 550,000 111,500,000

Timbunan 2 mobil 320,000 111,180,00027 Balok 8x12x4m 0,8 m3 38 1,440,000 109,740,000

Balok 5x10x4m 2,8 m3 5,040,000 104,700,000Balok 4x6x4m 2,7 m3 4,860,000 99,840,000

28 Batu merah 3500 buah 39 875,000 98,965,00028 Upah Tukang 40 2,500,000 96,465,00030 Batu merah 3500 buah 41 875,000 95,590,000

Jumlah Penerimaan 150,000,000Jumlah Pengeluaran 54,410,000Saldo 95,590,000

JUMLAH 150,000,000 JUMLAH 150,000,000

Mandai , 30 September 2005Kepala SMA Negeri 1 Mandai Petugas Pembukuan/ Bendahara

Drs. BAHARUDDIN TASIK LAYUK, S.Pd

Page 8: lpj RKB BLOCKGRAND 2007

NIP 131 600 053

BUKU KASPENERIMAAN DAN PENGELUARAN

DANA BLOCK GRANT IMBAL SWADAYA MUTU ( RKB )SMA NEGERI 1 MANDAI

Bulan : JULI 2007

Penerimaan Pengeluaran (Rp)No.

Jumlah Tgl UraianNo.

Jumlah SaldoBukti Bukti

Saldo buku per 95,590,000 2 Pasir Gowa 2 mobil 42 800,000 94,790,00030 Juni 2007 2 25 zak semen tonasa 43 875,000 93,915,000

3 Batu merah 3500 buah 44 875,000 93,040,0003 25 zak semen tonasa 45 875,000 92,165,0003 Upah kuseng 46 11,100,000 81,065,0005 Keramik putih 30x30 200 dos 47 6,000,000 75,065,000

Eternik 1x1m 100 lembar 3,000,000 72,065,0006 Baut 14 panjang 20cm 35 btng 48 672,500 71,392,500

Baut 14 panjang 15cm 20 btng 240,000 71,152,5006 Upah Tukang 49 2,500,000 68,652,5008 Behel U 2 set 50 50,000 68,602,500

Behel U 8 set 100,000 68,502,500Paku 5 cm 5 kg 50,000 68,452,500Paku 4 cm 5 kg 50,000 68,402,500

10 Pasir gowa 51 800,000 67,602,50011 Batu gunung 3 mobil 52 825,000 66,777,50011 Tanah timbunan 3 mobil 53 480,000 66,297,500

Pasir gowa 1 mobil 400,000 65,897,50012 Batu merah 3500 buah 54 875,000 65,022,50012 Tanah timbunan 5 mobil 55 800,000 64,222,50012 Batu merah 3500 buah 56 875,000 63,347,50013 Tanah Timbunan 5 mobil 57 800,000 62,547,500

Skopang 4 buah 180,000 62,367,50013 Upah Tukang 58 2,500,000 59,867,50014 Pasir Gowa 2 mobil 59 800,000 59,067,50015 Pasir gowa 1 mobil 60 400,000 58,667,500

Batu gunung 2 mobil 550,000 58,117,50015 25 zak semen tonasa 61 875,000 57,242,50017 Pasir gowa 2 mobil 62 800,000 56,442,50017 25 zak semen tonasa 63 875,000 55,567,50020 Seng 10 kaki 220 lembar 64 11,500,000 44,067,50020 Upah tukang 65 2,500,000 41,567,50021 Seng licin 10 lembar 66 650,000 40,917,500

Paku seng 5 dos 237,500 40,680,00021 Upah Tukang 67 2,500,000 38,180,00021 Batu merah 3500 buah 68 875,000 37,305,00021 20 zak semen tonasa 69 700,000 36,605,00022 Paku 10 kg 70 100,000 36,505,000

Paku 10 kg 100,000 36,405,000Paku 10 kg 100,000 36,305,000Paku Elektrik 137,500 36,167,500Recas 30,000 36,137,500

Page 9: lpj RKB BLOCKGRAND 2007

Pipa paralon 150,000 35,987,500Sambungan 30,000 35,957,500Lem pipa PVC 15,000 35,942,500

23 Residu 6 kaleng 71 570,000 35,372,50023 Batu merah 3500 buah 72 875,000 34,497,50024 Tanah timbunan 73 480,000 34,017,50024 Batu merah 3000 buah 74 750,000 33,267,500

Tanah Timbunan 1 mobil 160,000 33,107,50024 20 zak semen tonasa 75 700,000 32,407,50024 Papan Les plafon 70 lembar 76 770,000 31,637,500

Tanah timbunan 1 mobil 160,000 31,477,50024 Pasir gowa 2 mobil 77 800,000 30,677,50025 Pasir gowa 1 mobil 78 400,000 30,277,500

Tanah Timbunan 3 mobil 480,000 29,797,50025 Papan les plafon 38 lembar 79 950,000 28,847,50026 Cat tembok 7 pail 80 875,000 27,972,500

Kuas roll 4 buah 60,000 27,912,50026 20 zak semen tonasa 81 875,000 27,037,50027 Cat AVIAN 30 kaleng 82 885,000 26,152,500

Kuas 3 cm 4 buah 25,000 26,127,50027 Plamor Boyo 3 pail 83 217,500 25,910,000

Cape Dempul 2 kaleng 50,000 25,860,000Meni kayu 8 kaleng 340,000 25,520,000Kertas gosok 10 lembar 120,000 25,400,000Minyak cat 12 kaleng 210,000 25,190,000Doc Balon 6 buah 48,000 25,142,000

29 Plamor Boyo 5 pail 84 362,500 24,779,500Cat AVIAN 5 kaleng 147,500 24,632,000Minyak cat 5 liter 87,500 24,544,500

29 Batu merah 2500 buah 85 625,000 23,919,50030 Engsel jendela 32 pasang 86 368,000 23,551,500

Grendel kodok 32 pasang 240,000 23,311,500Hak angin 32 pasang 160,000 23,151,500

30 Engsel pintu 10 pasang 87 220,000 22,931,500Grendel kodok 4 pasang 30,000 22,901,500Kunci pintu 2 pasang 151,500 22,750,000

30 Cat tembok 2 pail 88 250,000 22,500,00031 Upah tukang 89 2,500,000 20,000,000

Jumlah Penerimaan 95,590,000Jumlah Pengeluaran 75,590,000

Saldo 20,000,000

JUMLAH 95,590,000 JUMLAH 95,590,000

Mandai , 30 Juli 2007Kepala SMA Negeri 1 Mandai Petugas Pembukuan/ Bendahara

Drs. BAHARUDDIN TASIK LAYUK, S.PdNIP 131 600 053

Page 10: lpj RKB BLOCKGRAND 2007

BUKU KAS

PENERIMAAN DAN PENGELUARAN

DANA BLOCK GRANT IMBAL SWADAYA MUTU ( RKB )

SMA NEGERI 1 MANDAI

Bulan : AGUSTUS 2007

Penerimaan Pengeluaran (Rp)

UraianNo.

Jumlah Tgl UraianNo.

Jumlah SaldoBukti Bukti

Saldo buku per 20,000,000 12 Mobiler 90 20,000,000 030 Juli 2007

Jumlah Penerimaan 20,000,000Jumlah Pengeluaran 20,000,000

Saldo 0

JUMLAH 20,000,000 JUMLAH 20,000,000

Mandai , 30 Agustus 2007Kepala SMA Negeri 1 Mandai Petugas Pembukuan/ Bendahara

Drs. BAHARUDDIN TASIK LAYUK, S.PdNIP 131 600 053

Page 11: lpj RKB BLOCKGRAND 2007

BUKU KASPENERIMAAN DAN PENGELUARAN

DANA SHARING RKB SMA NEGERI 1 MANDAI

Bulan : MEI 2007

Penerimaan Pengeluaran (Rp)

UraianNo.

Jumlah Tgl UraianNo.

Jumlah SaldoBukti Bukti

Dana Sharing 37,505,000 25 Pembersihan lokasi 01 1,000,000 36,505,000Komite 25 Pengerjaan dan pemasangan 02 2,000,000 34,505,000

boardplant25 03 8,887,500 25,617,500

Besi beton φ 6 pull 160 btng 1,900,000 23,717,500Kawat beton RRT 1 roll 275,000 23,442,500Gerobak dorong 3 buah 780,000 22,662,500Slang air 1/2 inch 3 roll 585,000 22,077,500Ember cor sedang 15 buah 108,500 21,969,000

25 Pasir gowa 5 mobil 04 2,000,000 19,969,000Batu gunung 4 mobil 1,000,000 18,969,000Balok 4x6x4 1m3 1,800,000 17,169,000Papan mall 1,000,000 16,169,000Balok 6x12x4 720,000 15,449,000

26 Batu gunung 4 mobil 05 1,100,000 14,349,000100 zak Semen Tonasa 3,500,000 10,849,000

28 Pasir Gowa 2 mobil 06 800,000 10,049,00029 Batu gunung 4 mobil 07 1,100,000 8,949,000

Cipping 1 mobil 900,000 8,049,00031 Batu merah 4500 buah 08 1,125,000 6,924,00031 Upah Tukang 09 1,100,000 5,824,00031 Pajak 10 5,472,000 352,00031 Materai 3000 80 lembar 11 240,000 112,000

Materai 6000 10 lembar 60,000 52,00031 Penjilidan 12 52,000 0

Jumlah Penerimaan 37,505,00031 Jumlah Pengeluaran 37,505,000

Saldo 0

JUMLAH 37,505,000 31 JUMLAH 37,505,000

Mandai , 31 Mei 2007Kepala SMA Negeri 1 Mandai Petugas Pembukuan/ Bendahara

Besi beton φ 10 pull 225 btng

Page 12: lpj RKB BLOCKGRAND 2007

Drs. BAHARUDDIN TASIK LAYUK, S.PdNIP 131 600 053

Page 13: lpj RKB BLOCKGRAND 2007

LAPORAN KEUANGAN

DANA SHARING RKB SMA NEGERI 1 MANDAIPROVINSI : SULAWESI SELATANKABUPATEN : MAROSNAMA SEKOLAH : SMA NEGERI 1 MANDAIPeriode : MEI 2007

Penerimaan Pengeluaran (Rp)

Tgl Uraian Rp Tgl Uraian RpNo.

JumlahBukti

1 Dana Sharing Komite 37,505,000 25 Pembersihan lokasi 898,750 01 898,75025 Pengerjaan dan pemasangan

bowplant 898,750 02 898,750

25 8,887,500 03 12,536,000Besi beton φ 6 pull 160 btng 1,900,000Kawat beton RRT 1 roll 275,000Gerobak dorong 3 buah 780,000Slang air 1/2 inch 3 roll 585,000Ember cor sedang 15 buah 108,500

25 Pasir gowa 5 mobil 2,000,000 04 6,520,000Batu gunung 4 mobil 1,000,000Balok 4x6x4 1m3 1,800,000Papan mall 1,000,000Balok 6x12x4 720,000

26 Batu gunung 4 mobil 1,100,000 05 4,600,000100 zak Semen Tonasa 3,500,000

28 Pasir Gowa 2 mobil 800,000 06 800,00029 Batu gunung 4 mobil 1,100,000 07 2,000,000

Cipping 1 mobil 900,000

31 Batu merah 4500 buah 1,125,000 08 1,125,00031 Upah Tukang 1,100,000 09 1,100,00031 Pajak 6,674,500 10 6,674,50031 Materai 3000 80 lembar 240,000 11 300,000

Materai 6000 10 lembar 60,00031 Penjilidan 52,000 12 52,000

Jumlah Penerimaan 37,505,000Jumlah Pengeluaran 37,505,000 37,505,000Saldo 0 0

Jumlah 37,505,000 Jumlah 37,505,000 37,505,000

Rincian:JUMLAH PENERIMAAN : Rp. 37,505,000JUMLAH PENGELUARAN : Rp. 37,505,000SALDO BUKU 0

Tanggal , 31 Mei 2007Kepala SMA Negeri 1 Mandai Bendahara,

Drs. BAHARUDDIN TASIK LAYUK,S.PdNIP 131 600 053

Besi beton φ 10 pull 225 btng

Page 14: lpj RKB BLOCKGRAND 2007

sma mandai

Page 15: lpj RKB BLOCKGRAND 2007

39500