PROYEK PERLUASAN SLTP JAKARTA PEKERJAAN : Pembangunan Unit Sekolah Baru SLTP Negeri Dengan Mekanisme Partisipasi Masyarakat LOKASI PEKERJAAN : Unit Sekolah Baru SMP Negeri 3 Kuripan DESA/ KECAMATAN : Kuripan Selatan / Kuripan KABUPATEN : Lombok Barat TAHUN ANGGARAN : 2005 PROPINSI : Nusa Tenggara Barat DAFTAR HARGA SATUAN UPAH DAN BAHAN NO URAIAN SATUAN HARGA SATUAN DAFTAR HARGA SATUAN UPAH PROPOSAL EE 1 Pekerja masyarakat org/hr 20,000 18,000 2 Mandor org/hr - 3 Tukang batu org/hr 32,000 30,000 4 Kepala tukang batu org/hr 35,000 32,000 5 Tukang besi beton org/hr 32,000 30,000 6 Kepala tukang besi beton org/hr 35,000 32,000 7 Tukang kayu org/hr 32,000 30,000 8 Kepala tukang kayu org/hr 35,000 32,000 9 Tukang cat org/hr 32,000 27,500 10 Kepala tukang cat org/hr 35,000 30,000 11 Operator org/hr 37,000 30,000 DAFTAR HARGA SATUAN BAHAN 1 Tanah urug 40,000 27,000 2 Pasir urug 40,000 27,500 3 Batu kali 55,000 41,300 4 PC (50 kg) zak 29,500 30,000 5 Semen warna kg 5,000 5,000 6 Pasir pasang 43,000 43,700 7 Bata merah buah 200 175 8 Kerikil 55,000 60,000 9 Besi beton kg 7,000 5,500 10 Kawat beton kg 7,000 7,000 11 Paku kg 7,000 7,500 12 Kayu klas III 1,350,000 830,000 13 Kayu klas II 1,900,000 1,350,000 14 Papan kayu klas I 2,250,000 2,500,000 m 3 m 3 m 3 m 3 m 3 m 3 m 3 m 3

description

rq

Transcript of Rab RKB MI 2013wf

Page 1: Rab RKB MI 2013wf

PROYEK PERLUASAN SLTP JAKARTA

PEKERJAAN : Pembangunan Unit Sekolah Baru SLTP Negeri Dengan Mekanisme Partisipasi Masyarakat

LOKASI PEKERJAAN : Unit Sekolah Baru SMP Negeri 3 KuripanDESA/ KECAMATAN : Kuripan Selatan / KuripanKABUPATEN : Lombok BaratTAHUN ANGGARAN : 2005PROPINSI : Nusa Tenggara Barat

DAFTAR HARGA SATUAN UPAH DAN BAHAN

NO URAIAN SATUAN HARGA SATUAN

DAFTAR HARGA SATUAN UPAH PROPOSAL EE NEGOSIASI

1 Pekerja masyarakat org/hr 20,000 18,000 18,000 2 Mandor org/hr - - 3 Tukang batu org/hr 32,000 30,000 30,000 4 Kepala tukang batu org/hr 35,000 32,000 32,000 5 Tukang besi beton org/hr 32,000 30,000 30,000 6 Kepala tukang besi beton org/hr 35,000 32,000 32,000 7 Tukang kayu org/hr 32,000 30,000 30,000 8 Kepala tukang kayu org/hr 35,000 32,000 32,000 9 Tukang cat org/hr 32,000 27,500 27,500

10 Kepala tukang cat org/hr 35,000 30,000 30,000 11 Operator org/hr 37,000 30,000 30,000

DAFTAR HARGA SATUAN BAHAN

1 Tanah urug 40,000 27,000 27,000 2 Pasir urug 40,000 27,500 27,500 3 Batu kali 55,000 41,300 41,300 4 PC (50 kg) zak 29,500 30,000 29,500 5 Semen warna kg 5,000 5,000 5,000 6 Pasir pasang 43,000 43,700 43,000 7 Bata merah buah 200 175 175 8 Kerikil 55,000 60,000 55,000 9 Besi beton kg 7,000 5,500 5,500

10 Kawat beton kg 7,000 7,000 7,000 11 Paku kg 7,000 7,500 7,000 12 Kayu klas III 1,350,000 830,000 830,000 13 Kayu klas II 1,900,000 1,350,000 1,350,000

14 Papan kayu klas I 2,250,000 2,500,000 2,250,000

m3

m3

m3

m3

m3

m3

m3

m3

Page 2: Rab RKB MI 2013wf

NO URAIAN SATUAN HARGA SATUAN

DAFTAR HARGA SATUAN BAHAN

15 Kaca polos 5 mm 63,000 55,000 55,000 16 Paku list kg 7,000 7,500 7,000 17 Paku payung kg 12,500 13,000 12,500 18 Triplek 3 mm lembar 40,000 34,500 34,500 19 Genteng pejaten buah 680 700 680 20 Bubungan pejaten buah 2,750 2,500 2,500 21 Seng talang BJLS 25 m' 6,750 7,000 6,750 22 Cat kayu kg 28,000 28,500 28,000 23 Cat meni kg 17,500 16,500 16,500 24 Minyak cat liter 6,000 6,000 6,000 25 Plamir kayu kg 15,000 15,000 15,000 26 Plamir tembok kg 7,000 7,500 7,000 27 Ampelas lembar 2,500 2,500 2,500 28 Asbes gelombang kecil lembar 20,000 21,500 20,000 29 Cat tembok kg 10,500 11,000 10,500 30 Roll cat buah 8,000 8,500 8,000 31 Teer arang kg 3,500 3,000 3,000 32 Politur jadi liter 22,500 25,000 22,500 33 Dempul kayu kg 12,500 11,000 11,000 34 Keramik lantai 30/30 33,500 32,500 32,500 35 Keramik dinding 20/20 37,500 37,500 37,500 36 Paving block buah 800 800 800 37 Kloset jongkok porselen buah 65,000 65,000 65,000 38 List plafond m' 6,500 6,500 6,500 39 Ekspagnolet buah 29,000 30,000 29,000 40 Ijuk kg 5,000 7,500 5,000 41 Buis beton 1/2 diameter 30 cm buah 15,000 14,000 14,000 42 Kran diameter 1/2" buah 12,500 12,500 12,500 43 Bak mandi fiber buah 160,000 150,000 150,000 44 Bak cuci (Kitchenzink) buah 150,000 150,000 150,000 45 Bak cuci (Kitchenzink) Tunggal buah 75,000 75,000 75,000 46 Avour buah 18,000 18,000 18,000 47 Wastafel buah 300,000 250,000 250,000 48 Pipa PVC diameter 4" m' 55,000 50,000 50,000 49 Pipa PVC diameter 3 " m' 36,000 33,000 33,000 50 Pipa PVC diameter 2 " m' 20,000 20,000 20,000 51 Pipa PVC diameter 1/2 " m' 4,000 3,750 3,750 52 Kunci tanam union (dua slag) buah 78,000 55,000 55,000 53 Engsel pintu Nylon buah 6,000 5,000 5,000 54 Engsel jendela nylon buah 4,000 4,000 4,000 55 Hak angin buah 3,600 3,000 3,000 56 Mile Stone kg 2,000 1,400 1,400 57 Arde titik 55,000 55,000 55,000 58 Talang karet m' 15,000 15,000 15,000 59 Pintu Gerbang Besi 350,000 350,000 350,000

m2

m2

m2

m2

Page 3: Rab RKB MI 2013wf

NO URAIAN SATUAN HARGA SATUAN

DAFTAR HARGA SATUAN BAHAN

59 Grendel jendela buah 2,500 2,500 2,500 60 Grendel tanam pintu buah 10,000 10,000 10,000 61 Angkur buah 600 600 600 62 Baut mur dia14 mm - 15 buah 3,500 3,000 3,000 63 Baut mur dia14 mm - 20 buah 5,000 4,000 4,000 64 Baut mur dia14 mm - 25 buah 6,000 5,000 5,000 65 Begel Plat buah 8,500 8,500 8,500 66 Begel sudut buah 9,000 9,000 9,000 67 Begel U buah 10,000 10,000 10,000 68 Titik lampu buah 90,000 85,000 85,000 69 Lampu TL 1 x 20 watt buah 45,000 45,000 45,000 70 Lampu pijar 25 watt buah 3,250 3,500 3,250 71 Saklar tunggal buah 8,000 8,000 8,000 72 Saklar double buah 11,500 11,500 11,500 73 Sekring box buah 60,000 55,000 55,000 74 Stop kontak tanam buah 65,000 65,000 65,000 75 Mahkota finish spesi buah 900,000 700,000 700,000 76 Pipa galvanis iron diameter 2" m' 42,500 42,500 42,500 77 Pipa galvanis iron diameter 3" m' 55,000 55,000 55,000 78 Kerekan tiang bendera buah 5,500 5,500 5,500 79 Huruf stainlessteel nama SLTP set 1,750,000 1,750,000 1,750,000 80 BBM liter 2,400 2,400 2,400 81 Sewa stamper alat/hari 30,000 30,000 30,000 82 Pipa galvanis iron diameter 1.5 " m' 32,500 32,500 32,500 83 Accessories pipa PVC ls 100,000 100,000 100,000 84 Knee GI 1.5 " buah 5,000 5,000 5,000 85 Tee GI 1.5 " buah 5,000 5,000 5,000 86 Kawat berduri m' 1,200 1,200 1,200 87 Besi siku L.50.50.5 m' 5,000 5,000 5,000 88 Alat bantu pekerjaan galian tanah ls 250 250 250 89 Peralatan pada pekerjaan beton cor ls 14,500 14,500 14,500 90 Peralatan, spencer ls 150 150 150 91 Kuas 3 " buah 5,000 5,000 5,000 92 Steger werk ls 250 250 250 93 Alat bantu pekerjaan anti rayap ls 500 500 500 94 Alat bantu pemotong keramik ls 500 500 500 95 Anti rayap 15,000 15,000 15,000 m2

Page 4: Rab RKB MI 2013wf

RENCANA ANGARAN BIAYA

PEKERJAAN : Pembanguna SMPN Dasan Baru

LOKASI PEKERJAAN :DESA/ KECAMATAN :KABUPATEN : Lombok Barat

TAHUN ANGGARAN : 2006

PROPINSI : Nusa Tenggara Barat

DAFTAR HARGA SATUAN UPAH DAN BAHAN

No. U r a i a n Daftar Harga (Rp.) S a t u a n

DAFTAR HARGA SATUAN UPAH

1 Pekerja masyarakat 18,000 org/hr2 Mandor - org/hr3 Tukang batu 30,000 org/hr4 Kepala tukang batu 32,000 org/hr5 Tukang besi beton 30,000 org/hr6 Kepala tukang besi beton 32,000 org/hr7 Tukang kayu 30,000 org/hr8 Kepala tukang kayu 32,000 org/hr9 Tukang cat 27,500 org/hr

10 Kepala tukang cat 30,000 org/hr11 Operator 30,000 org/hr

DAFTAR HARGA SATUAN BAHAN

1 Tanah urug 30,000 2 Pasir urug 27,500 3 Batu kali 45,000 4 PC (50 kg) 34,000 zak5 Semen warna 7,500 kg6 Pasir pasang 45,000 7 Bata merah 175 buah8 Kerikil 60,000 9 Besi beton 5,500 kg

10 Kawat beton 7,000 kg11 Paku 8,500 kg12 Kayu klas III 850,000 13 Kayu klas II 1,450,000

14 Papan kayu klas I 2,350,000

m3

m3

m3

m3

m3

m3

m3

m3

Page 5: Rab RKB MI 2013wf

No. U r a i a n Daftar Harga (Rp.) S a t u a n

DAFTAR HARGA SATUAN BAHAN

15 Kaca polos 5 mm 55,000 16 Paku list 7,000 kg17 Paku payung 12,500 kg18 Triplek 3 mm 34,500 lembar19 Genteng 680 buah20 Bubungan Genteng 2,500 buah21 Seng talang BJLS 25 6,750 m'22 Cat kayu 28,000 kg23 Cat meni 16,500 kg24 Minyak cat 6,000 liter25 Plamir kayu 15,000 kg26 Plamir tembok 7,000 kg27 Ampelas 2,500 lembar28 Asbes gelombang kecil 20,000 lembar29 Cat tembok 10,500 kg30 Roll cat 8,000 buah31 Teer arang 3,000 kg32 Politur jadi 22,500 liter33 Dempul kayu 11,000 kg34 Keramik lantai 30/30 32,500 35 Keramik dinding 20/20 37,500 36 Paving block 800 buah37 Kloset jongkok porselen 65,000 buah38 List plafond 6,500 m'39 Ekspagnolet 29,000 buah40 Ijuk 5,000 kg41 Buis beton 1/2 diameter 30 cm 14,000 buah42 Kran diameter 1/2" 12,500 buah43 Bak mandi fiber 150,000 buah44 Bak cuci (Kitchenzink) 150,000 buah45 Bak cuci (Kitchenzink) Tunggal 75,000 buah46 Avour 18,000 buah47 Wastafel 250,000 buah48 Pipa PVC diameter 4" 50,000 m'

49 Pipa PVC diameter 3 " 33,000 m'

50 Pipa PVC diameter 2 " 20,000 m'

51 Pipa PVC diameter 1/2 " 3,750 m'

52 Kunci tanam union (dua slag) 55,000 buah53 Engsel H besar 5,000 buah54 Engsel H kecil 4,000 buah55 Hak angin 3,000 buah56 Mile Stone 1,400 kg57 Arde 55,000 titik58 Talang karet 15,000 m'59 Pintu Gerbang Besi 350,000

m2

m2

m2

m2

Page 6: Rab RKB MI 2013wf

No. U r a i a n Daftar Harga (Rp.) S a t u a n

DAFTAR HARGA SATUAN BAHAN

59 Grendel jendela 2,500 buah60 Grendel tanam pintu 10,000 buah61 Angkur 600 buah62 Baut mur dia14 mm - 15 3,000 buah63 Baut mur dia14 mm - 20 4,000 buah64 Baut mur dia14 mm - 25 5,000 buah65 Begel Plat 8,500 buah66 Begel sudut 9,000 buah67 Begel U 10,000 buah68 Titik lampu 85,000 buah69 Lampu TL 1 x 20 watt 45,000 buah70 Lampu pijar 25 watt 3,250 buah71 Saklar tunggal 8,000 buah72 Saklar double 11,500 buah73 Sekring box 55,000 buah74 Stop kontak tanam 65,000 buah75 Mahkota finish spesi 700,000 buah76 Pipa galvanis iron diameter 2" 42,500 m'77 Pipa galvanis iron diameter 3" 55,000 m'78 Kerekan tiang bendera 5,500 buah79 Huruf stainlessteel nama SLTP 1,750,000 set80 BBM 2,400 liter81 Sewa stamper 30,000 alat/hari82 Pipa galvanis iron diameter 1.5 " 32,500 m'83 Accessories Pipa PVC 100,000 ls84 Knee GI 1.5 " 5,000 buah85 Tee GI 1.5 " 5,000 buah86 Kawat berduri 1,200 m'87 Besi siku L.50.50.5 5,000 m'88 Alat bantu pekerjaan galian tanah 250 ls89 Peralatan pada pekerjaan beton cor 14,500 ls90 Peralatan, spencer 150 ls91 Kuas 3 " 5,000 buah92 Steger werk 250 ls93 Alat bantu pekerjaan anti rayap 500 ls94 Alat bantu pemotong keramik 500 ls95 Anti rayap 15,000 m2

Page 7: Rab RKB MI 2013wf

RENCANA ANGARAN BIAYA PEKERJAAN : Pembangunan Ruang Kelas Baru (RKB)

MI An Nabawiyyah NW GelanggangLOKASI PEKERJAAN : Jl. Arwah SombeDESA/ KECAMATAN : Gelanggang / Sakra TimurKABUPATEN : Lombok TimurTAHUN ANGGARAN : 2012/2013PROPINSI : Nusa Tenggara Barat

REKAPITULASI RENCANA ANGGARAN BIAYA

NO. URAIAN PEKERJAAN RAB (RP)

I BIAYA KONSTRUKSI (3 Lokal/Rombel)1 PEKERJAAN PERSIAPAN 10,000,000 2 PEKERJAAN TANAH DAN PASIR 14,335,059 3 PEKERJAAN PONDASI DAN BETON 71,827,269 4 PEKERJAAN LANTAI 34,341,432 5 PEKERJAAN DINDING 33,988,435 6 PEKERJAAN KAYU 78,491,916 7 PEKERJAAN PLESTERAN 40,784,590 8 PEKERJAAN ATAP/ PLAFOND 42,094,850 9 PEKERJAAN BESI/ BAJA 4,828,800 10 PEKERJAAN PENGECATAN 18,716,939 11 PEKERJAAN INSTALASI LISTRIK 4,241,000 12 PEKERJAAN LAIN-LAIN 6,430,104

S U B T O T A L 360,080,393

D I B U L A T K A N 360,000,000 TERBILANG : Tiga Ratus Enam Puluh Juta RRupiah.-

Gelanggang, 28 Januari 2012

Ketua/Pendiri

Pondok Pesantren Zayyina Bish Shobri NW Gelanggang

TGH.M.MUZAYYIN SHOBRI, QH,.M.Pd.I

Page 8: Rab RKB MI 2013wf

RENCANA ANGARAN BIAYA

PEKERJAAN : Pembangunan Ruang Kelas Baru (RKB)

Dengan Mekanisme Partisipasi MasyarakatLOKASI PEKERJAAN : Jl. Arwah SombeDESA/ KECAMATAN : Gelanggang / Sakra TimurKABUPATEN : Lombok TimurTAHUN ANGGARAN : 2005PROPINSI : Nusa Tenggara Barat

ANALISIS HARGA SATUAN

No. Kode U r a i a n Koef. K. Red. Satuan Hrg Sat. (Rp.) Jumlah (Rp.) Jlh. Red. (Rp.) Deviasi Red.

1 A.1 Galian tanah pondasi (m3)UPAHPekerja 0.7500 0.6000 org/hr 18,000 13,500 10,800 0.1500Alat bantu 1.0000 1.0000 ls 250 250 250 0.0000

S u b T o t a l 13,750 11,050 0.1500

2 A.6 Urugan kembali 1/4 dari galian (m3)Pekerja 0.3300 0.2640 org/hr 18,000 5,940 4,752 0.0660

S u b T o t a l 5,940 4,752 0.0660

3 A.11 Urugan tanah di bawah lantai (m3)UPAHPekerja 0.3000 0.2400 org/hr 18,000 5,400 4,320 0.0600BAHANTanah urug 1.2000 1.2000 30,000 36,000 36,000 0.0000

S u b T o t a l 41,400 40,320 0.0600

4 A.8 Tanah diangkut sejauh 30 m (m3)UPAHPekerja 0.3300 0.2640 org/hr 18,000 5,940 4,752 0.0660

S u b T o t a l 5,940 4,752 0.0660

5 A.12 Urugan pasir di bawah lantai dan pondasi (m3)UPAHPekerja 0.3000 0.2400 org/hr 18,000 5,400 4,320 0.0600Operator 0.0400 0.0320 org/hr 30,000 1,200 960 0.0080BAHANPasir urug 1.2000 0.9600 27,500 33,000 26,400 0.2400Sewa stamper 0.0500 0.0400 unit/ hari 30,000 1,500 1,200 0.0100BBM 0.3125 0.2500 liter 2,400 750 600 0.0625

S u b T o t a l 41,850 33,480 0.3080

6 G.2 Pasangan batu kosong (m3)UPAHPekerja 1.5000 0.2125 org/hr 18,000 27,000 3,825 1.2875BAHANBatu kali 1.2000 1.0500 45,000 54,000 47,250 0.1500

S u b T o t a l 81,000 51,075 1.4375

7 G.32.h Pasangan batu kali 1Pc : 4 Ps (m3)UPAHTukang batu 1.2000 0.5000 org/hr 30,000 36,000 15,000 0.7000Kepala tukang batu 0.1200 0.1000 org/hr 32,000 3,840 3,200 0.0200Pekerja 3.6000 0.5000 org/hr 18,000 64,800 9,000 3.1000BAHANBatu kali 1.2000 1.1000 45,000 54,000 49,500 0.1000PC (50 kg) 3.2570 2.5000 zak 34,000 110,738 85,000 0.7570Pasir 0.5220 0.4000 45,000 23,490 18,000 0.1220

S u b T o t a l 292,868 179,700 4.7990

m3

m3

m3

m3

m3

Page 9: Rab RKB MI 2013wf

No. Kode U r a i a n Koef. K. Red. Satuan Harga Sat. (Rp.) Jumlah (Rp.) Jlh. Red. (Rp.) Deviasi Red.

8 G.33.L Pasangan bata trasram 1 Pc : 3 Ps (m3)

UPAH

Tukang batu 1.5000 1.2000 org/hr 30,000 45,000 36,000 0.3000

Kepala tukang batu 0.1500 0.1200 org/hr 32,000 4,800 3,840 0.0300

Pekerja 4.5000 3.6000 org/hr 18,000 81,000 64,800 0.9000

BAHAN

Bata merah 650.000 650.000 bh 175 113,750 113,750 0.0000

PC (50 kg) 3.1480 3.1480 zak 34,000 107,032 107,032 0.0000

Pasir 0.3780 0.3780 45,000 17,010 17,010 0.0000

S u b T o t a l 368,592 342,432 1.2300

9 G.33.b Pasangan bata dinding 1 Pc : 4 Ps (m3)

UPAH

Tukang batu 1.5000 1.2000 org/hr 30,000 45,000 36,000 0.3000

Kepala tukang batu 0.1500 0.1200 org/hr 32,000 4,800 3,840 0.0300

Pekerja 4.5000 3.6000 org/hr 18,000 81,000 64,800 0.9000

BAHAN

Bata merah 650.000 650.0000 buah 175 113,750 113,750 0.0000

PC (50 kg) 2.5330 2.5330 zak 34,000 86,122 86,122 0.0000

Pasir 0.4060 0.4060 45,000 18,270 18,270 0.0000

S u b T o t a l 348,942 322,782 1.2300

10 V Beton cor 1 Pc: 2 Ps: 3 Kr (m3)

UPAH

Tukang batu 1.0000 0.9000 org/hr 30,000 30,000 27,000 0.1000

Kepala tukang batu 1.0000 0.9000 org/hr 32,000 32,000 28,800 0.1000

Pekerja 6.0000 4.8000 org/hr 18,000 108,000 86,400 1.2000

BAHAN

Kerikil 1.0375 0.8300 60,000 62,250 49,800 0.2075

PC (50 kg) 8.5000 6.4000 zak 34,000 289,000 217,600 2.1000

Pasir 0.5400 0.5400 45,000 24,300 24,300 0.0000

Peralatan 1.0000 1.0000 ls 14,500 14,500 14,500 0.0000

S u b T o t a l 560,050 448,400 3.7075

11 V.1 Pekerjaan besi beton (1 kg)

UPAH

Tukang besi 0.0675 0.0540 org/hr 30,000 2,025 1,620 0.0135

Kepala tukang besi 0.0225 0.0180 org/hr 32,000 720 576 0.0045

Pekerja 0.0200 0.0160 org/hr 18,000 360 288 0.0040

BAHAN

Besi beton 1.1000 1.1000 kg 5,500 6,050 6,050 0.0000

Kawat beton 0.0200 0.0200 kg 7,000 140 140 0.0000

Peralatan, spencer 1.0000 1.0000 ls 150 150 150 0.0000

S u b T o t a l 9,445 8,824 0.0220

12 V.3 Cetakan beton

UPAH

Tukang kayu 0.5000 0.1500 org/hr 30,000 15,000 4,500 0.3500

Kepala tukang kayu 0.0500 0.0300 org/hr 32,000 1,600 960 0.0200

Pekerja 0.2200 0.1000 org/hr 18,000 3,960 1,800 0.1200

BAHAN

Kayu klas III 0.0280 0.0020 850,000 23,800 1,700 0.0260

Paku 0.2500 0.2500 kg 8,500 2,125 2,125 0.0000

S u b T o t a l 46,485 11,085 0.5160

13 V.4 Penyiraman beton dan pembongkaran cetakan

UPAH

Pekerja 4.0000 3.2000 org/hr 18,000 72,000 57,600 0.8000

S u b T o t a l 72,000 57,600 0.8000

m3

m3

m3

m3

m3

Page 10: Rab RKB MI 2013wf

No. Kode U r a i a n Koef. K. Red. Satuan Harga Sat. (Rp.) Jumlah (Rp.) Jlh. Red. (Rp.) Deviasi Red.

14 V.a Beton bertulang (100 kg)

Beton cor (analisa V) 1.000 1.000 448,400 448,400 448,400 0.0000

Cetakan beton (analisa V.3) 10.000 10.000 11,085 110,850 110,850 0.0000

Besi beton (analisa V.1) 100.000 100.000 kg 8,824 882,400 882,400 0.0000

Siram/ bongkar cetakan (analisa V.4) 1.000 1.000 org/hr 57,600 57,600 57,600 0.0000

S u b T o t a l 1,499,250 1,499,250 0.0000

15 V.b Beton bertulang (175 kg)

Beton cor (analisa V) 1.000 1.000 448,400 448,400 448,400 0.0000

Cetakan beton (analisa V.3) 10.000 10.000 11,085 110,850 110,850 0.0000

Besi beton (analisa V.1) 175.000 175.000 kg 8,824 1,544,200 1,544,200 0.0000

Siram/ bongkar cetakan (analisa V.4) 1.000 1.000 - 57,600 57,600 57,600 0.0000

S u b T o t a l 2,161,050 2,161,050 0.0000

16 V.c Beton Bertulang (200 kg)

Beton cor (analisa V) 1.000 1.000 448,400 448,400 448,400 0.0000

Cetakan beton (analisa V.3) 10.000 10.000 11,085 110,850 110,850 0.0000

Besi beton (analisa V.1) 200.000 200.000 kg 8,824 1,764,800 1,764,800 0.0000

Siram/ bongkar cetakan (analisa V.4) 1.000 1.000 - 57,600 57,600 57,600 0.0000

S u b T o t a l 2,381,650 2,381,650 0.0000

17 V.d Beton bertulang (250 kg)

Beton cor (analisa V) 1.000 1.000 448,400 448,400 448,400 0.0000

Cetakan beton (analisa V.3) 10.000 10.000 11,085 110,850 110,850 0.0000

Besi beton (analisa V.1) 250.000 250.000 kg 8,824 2,206,000 2,206,000 0.0000

Siram/ bongkar cetakan (analisa V.4) 1.000 1.000 - 57,600 57,600 57,600 0.0000

S u b T o t a l 2,822,850 2,822,850 0.0000

18 V.e Beton bertulang (300 kg)

Beton cor (analisa V) 1.000 1.000 448,400 448,400 448,400 0.0000

Cetakan beton (analisa V.3) 10.000 10.000 11,085 110,850 110,850 0.0000

Besi beton (analisa V.1) 300.000 300.000 kg 8,824 2,647,200 2,647,200 0.0000

Siram/ bongkar cetakan (analisa V.4) 1.000 1.000 - 57,600 57,600 57,600 0.0000

S u b T o t a l 3,264,050 3,264,050 0.0000

19 G.43.a Pasangan beton rabat 1 Pc : 3 Ps : 5 Kr (m3)

UPAH

Tukang batu 0.5000 0.4000 org/hr 30,000 15,000 12,000 0.1000

Kepala tukang batu 0.0500 0.0500 org/hr 32,000 1,600 1,600 0.0000

Pekerja 6.0000 4.8000 org/hr 18,000 108,000 86,400 1.2000

BAHAN

PC (50 kg) 3.6300 3.6300 zak 34,000 123,420 123,420 0.0000

Pasir 0.5400 0.4300 45,000 24,300 19,350 0.1100

Kerikil 0.9100 0.7300 60,000 54,600 43,800 0.1800

S u b T o t a l 326,920 286,570 1.5900

20 F.22 Kuda-kuda, gording/ kap kayu klas II (m3)

UPAH

Tukang kayu 24.0000 19.2000 org/hr 30,000 720,000 576,000 4.8000

Kepala tukang kayu 2.4000 1.9200 org/hr 32,000 76,800 61,440 0.4800

Pekerja 8.0000 6.4000 org/hr 18,000 144,000 115,200 1.6000

BAHAN

Kayu klas II 1.2000 1.1000 1,450,000 1,740,000 1,595,000 0.1000

Paku 2.5000 2.0000 kg 8,500 21,250 17,000 0.5000

S u b T o t a l 2,702,050 2,364,640 7.4800

m3

m2

m3

m2

m3

m2

m3

m2

m3

m2

m3

m3

m3

Page 11: Rab RKB MI 2013wf

No. Kode U r a i a n Koef. K. Red. Satuan Harga Sat. (Rp.) Jumlah (Rp.) Jlh. Red. (Rp.) Deviasi Red.

21 F.16.a Usuk kayu klas II, reng kayu II (m2)UPAHTukang kayu 0.1000 0.0800 org/hr 30,000 3,000 2,400 0.0200Kepala tukang kayu 0.0100 0.0080 org/hr 32,000 320 256 0.0020Pekerja 0.1000 0.0800 org/hr 18,000 1,800 1,440 0.0200BAHANKayu klas II 0.0153 0.0153 1,450,000 22,185 22,185 0.0000Paku 0.2500 0.2000 kg 8,500 2,125 1,700 0.0500

S u b T o t a l 29,430 27,981 0.0920

22 F.21 Listplank kayu klas II (m2)UPAHTukang kayu 0.8000 0.6400 org/hr 30,000 24,000 19,200 0.1600Kepala tukang kayu 0.0800 0.0640 org/hr 32,000 2,560 2,048 0.0160Pekerja 0.2800 0.2240 org/hr 18,000 5,040 4,032 0.0560BAHANKayu klas II 0.0100 0.0080 1,450,000 14,500 11,600 0.0020Paku 0.1000 0.0800 kg 8,500 850 680 0.0200

S u b T o t a l 46,950 37,560 0.2540

23 F.27 Kusen kayu klas II (m3)UPAHTukang kayu 36.0000 28.8000 org/hr 30,000 1,080,000 864,000 7.2000Kepala tukang kayu 3.6000 2.8800 org/hr 32,000 115,200 92,160 0.7200Pekerja 12.0000 9.6000 org/hr 18,000 216,000 172,800 2.4000BAHANKayu klas II 1.2000 1.1000 1,450,000 1,740,000 1,595,000 0.1000Paku 2.5000 2.0000 kg 8,500 21,250 17,000 0.5000

S u b T o t a l 3,172,450 2,740,960 10.9200

24 F.36.a Daun pintu panil (m2)UPAHTukang kayu 6.0000 4.8000 org/hr 30,000 180,000 144,000 1.2000Kepala tukang kayu 0.6000 0.4800 org/hr 32,000 19,200 15,360 0.1200Pekerja 2.0000 1.6000 org/hr 18,000 36,000 28,800 0.4000BAHANKayu klas II 0.0350 0.0350 1,450,000 50,750 50,750 0.0000Paku 0.1000 0.0800 kg 8,500 850 680 0.0200

S u b T o t a l 286,800 239,590 1.7400

25 F.36.c Daun pintu panil dilapisi seng BJLS (m2)UPAHTukang kayu 6.0000 4.8000 org/hr 30,000 180,000 144,000 1.2000Kepala tukang kayu 0.6000 0.4800 org/hr 32,000 19,200 15,360 0.1200Pekerja 2.0000 1.6000 org/hr 18,000 36,000 28,800 0.4000BAHANKayu klas II 0.0350 0.0350 1,450,000 50,750 50,750 0.0000Seng plat BJLS 1.0000 1.0000 lembar 6,750 6,750 6,750 0.0000Paku 0.1000 0.0800 kg 8,500 850 680 0.0200

S u b T o t a l 293,550 246,340 1.7400

26 F.36 Daun jendela kaca (m2)UPAHTukang kayu 6.0000 4.8000 org/hr 30,000 180,000 144,000 1.2000Kepala tukang kayu 0.6000 0.4800 org/hr 32,000 19,200 15,360 0.1200Pekerja 2.0000 1.6000 org/hr 18,000 36,000 28,800 0.4000BAHANKayu klas II 0.0350 0.0200 1,450,000 50,750 29,000 0.0150Kaca 5 mm 0.8000 0.8000 55,000 44,000 44,000 0.0000Paku list 0.1000 0.0800 kg 7,000 700 560 0.0200

S u b T o t a l 330,650 261,720 1.7550

m3

m3

m3

m3

m3

m3

m2

Page 12: Rab RKB MI 2013wf

No. Kode U r a i a n Koef. K. Red. Satuan Harga Sat. (Rp.) Jumlah (Rp.) Jlh. Red. (Rp.) Deviasi Red.

27 F.21.b Krepyak kayu klas II (m2)

UPAH

Tukang kayu 1.5000 1.2000 org/hr 30,000 45,000 36,000 0.3000

Kepala tukang kayu 0.1500 0.1200 org/hr 32,000 4,800 3,840 0.0300

Pekerja 0.5000 0.4000 org/hr 18,000 9,000 7,200 0.1000

BAHAN

Kayu klas II 0.0510 0.0500 1,450,000 73,950 72,500 0.0010

S u b T o t a l 132,750 119,540 0.4310

28 F.21.a Papan reuter kayu klas II (m3)

UPAH

Tukang kayu 0.8000 0.6000 org/hr 30,000 24,000 18,000 0.2000

Kepala tukang kayu 0.0800 0.0600 org/hr 32,000 2,560 1,920 0.0200

Pekerja 0.2800 0.2100 org/hr 18,000 5,040 3,780 0.0700

BAHAN

Kayu klas II 0.0040 0.0032 1,450,000 5,800 4,640 0.0008

Paku 0.1000 0.1000 kg 8,500 850 850 0.0000

S u b T o t a l 38,250 29,190 0.2908

29 G.50.q Plesteran trasram 1 Pc : 3 Ps (m2)

UPAH

Tukang batu 0.2000 0.1650 org/hr 30,000 6,000 4,950 0.0350

Kepala tukang batu 0.0200 0.0165 org/hr 32,000 640 528 0.0035

Pekerja 0.3690 0.2952 org/hr 18,000 6,642 5,314 0.0738

BAHAN

PC (50 kg) 0.2570 0.1928 zak 34,000 8,738 6,554 0.0643

Pasir 0.0200 0.0150 45,000 900 675 0.0050

Mile stone 3.0000 2.2500 kg 1,400 4,200 3,150 0.7500

S u b T o t a l 22,920 18,020 0.1816

G.50.r Plesteran dinding bata 1 Pc : 4 Ps (m2)

UPAH

Tukang batu 0.2000 0.1650 org/hr 30,000 6,000 4,950 0.0350

Kepala tukang batu 0.0200 0.0165 org/hr 32,000 640 528 0.0035

Pekerja 0.3690 0.2952 org/hr 18,000 6,642 5,314 0.0738

BAHAN

PC (50 kg) 0.2250 0.1688 zak 34,000 7,650 5,738 0.0562

Pasir 0.0220 0.0165 45,000 990 743 0.0055

Mile stone 2.7500 2.0625 kg 1,400 3,850 2,888 0.6875

S u b T o t a l 21,922 17,272 0.1740

31 H.5.c Atap genteng pejaten (m2)

UPAH

Tukang batu 0.2000 0.0650 org/hr 30,000 6,000 1,950 0.1350

Kepala tukang batu 0.0200 0.0125 org/hr 32,000 640 400 0.0075

Pekerja 0.4000 0.1000 org/hr 18,000 7,200 1,800 0.3000

BAHAN

Genteng 30.0000 30.0000 buah 680 20,400 20,400 0.0000

S u b T o t a l 34,240 24,550 0.4425

32 H.6.c Bubungan pejaten (m')

UPAH

Tukang batu 0.0200 0.0160 org/hr 30,000 600 480 0.0040

Kepala tukang batu 0.0200 0.0160 org/hr 32,000 640 512 0.0040

Pekerja 0.4000 0.1300 org/hr 18,000 7,200 2,340 0.2700

BAHAN

Bubungan 5.1000 5.1000 buah 2,500 12,750 12,750 0.0000

PC (50 kg) 0.1500 0.1500 zak 34,000 5,100 5,100 0.0000

Pasir 0.0500 0.0500 45,000 2,250 2,250 0.0000

S u b T o t a l 28,540 23,432 0.2780

m3

m3

m3

m3

m3

Page 13: Rab RKB MI 2013wf

No. Kode U r a i a n Koef. K. Red. Satuan Harga Sat. (Rp.) Jumlah (Rp.) Jlh. Red. (Rp.) Deviasi Red.

33 H.7 Atap asbes gelombang (m2)UPAHTukang kayu 0.2500 0.2000 org/hr 30,000 7,500 6,000 0.0500Kepala tukang kayu 0.0250 0.0200 org/hr 32,000 800 640 0.0050Pekerja 0.1250 0.1000 org/hr 18,000 2,250 1,800 0.0250BAHANAsbes gelombang 1.0625 0.8500 lembar 20,000 21,250 17,000 0.2125Paku payung 0.1250 0.1000 kg 12,500 1,563 1,250 0.0250

S u b T o t a l 33,363 26,690 0.3175

34 SP.VII.6 Pekerjaan plafond triplek 3 mm (m2)UPAHTukang kayu 0.5000 0.3300 org/hr 30,000 15,000 9,900 0.1700Kepala tukang kayu 0.0413 0.0330 org/hr 32,000 1,320 1,056 0.0083Pekerja 0.0625 0.0500 org/hr 18,000 1,125 900 0.0125BAHANKayu klas II 0.0150 0.0120 1,450,000 21,750 17,400 0.0030Paku 0.0125 0.0100 kg 8,500 106 85 0.0025Triplek 3 mm 0.4000 0.3500 lembar 34,500 13,800 12,075 0.0500

S u b T o t a l 53,101 41,416 0.2463

35 SP.IX.a Pekerjaan 3 kali pengecatan (m2)UPAHTukang cat 0.1875 0.1500 org/hr 27,500 5,156 4,125 0.0375Kepala tukang cat 0.0438 0.0350 org/hr 30,000 1,313 1,050 0.0088Pekerja 0.0937 0.0750 org/hr 18,000 1,687 1,350 0.0187BAHANCat kayu 0.2750 0.2200 kg 28,000 7,700 6,160 0.0550Cat meni 0.1833 0.1467 Kg 16,500 3,025 2,420 0.0367Minyak cat 0.3125 0.2500 liter 6,000 1,875 1,500 0.0625Plamir kayu 0.1125 0.0900 kg 15,000 1,687 1,350 0.0225Ampelas 0.5000 0.4000 lembar 2,500 1,250 1,000 0.1000Kuas 3 " 0.0625 0.0500 buah 5,000 313 250 0.0125

S u b T o t a l 24,006 19,205 0.3542

36 SP.IX Cat tembok, kolom, plafond (m2)UPAHTukang cat 0.1500 0.1200 org/hr 27,500 4,125 3,300 0.0300Kepala tukang cat 0.0250 0.0200 org/hr 30,000 750 600 0.0050Pekerja 0.0625 0.0500 org/hr 18,000 1,125 900 0.0125BAHANCat tembok 0.2500 0.2000 kg 10,500 2,625 2,100 0.0500Plamir tembok 0.1250 0.1000 kg 7,000 875 700 0.0250Roll cat 0.0125 0.0100 buah 8,000 100 80 0.0025Ampelas 0.6250 0.5000 lembar 2,500 1,563 1,250 0.1250Steger werk 1.2500 1.0000 ls 250 313 250 0.2500

S u b T o t a l 11,475 9,180 0.5000

37 K.35 Teer arang (m2)UPAHPekerja 0.1000 0.0300 org/hr 18,000 1,800 540 0.0700Tukang cat 0.1400 0.0500 org/hr 27,500 3,850 1,375 0.0900BAHANTeer arang 0.1000 0.1000 kg 3,000 300 300 0.0000Alat bantu pekerjaan anti rayap 1.0000 1.0000 ls 500 500 500 0.0000

S u b T o t a l 6,450 2,715 0.1600

m3

Page 14: Rab RKB MI 2013wf

No. Kode U r a i a n Koef. K. Red. Satuan Harga Sat. (Rp.) Jumlah (Rp.) Jlh. Red. (Rp.) Deviasi Red.

39 SP.III.16 Lantai keramik 30 x 30 1 Pc : 5 Ps (m2)

UPAH

Tukang batu 0.3400 0.2750 org/hr 30,000 10,200 8,250 0.0650

Kepala tukang batu 0.0620 0.0500 org/hr 32,000 1,984 1,600 0.0120

Pekerja 0.1800 0.1500 org/hr 18,000 3,240 2,700 0.0300

BAHAN

Keramik lantai 30/30 1.2500 1.0000 32,500 40,625 32,500 0.2500

PC (50 kg) 0.1750 0.1400 zak 34,000 5,950 4,760 0.0350

Semen warna 0.0160 0.0130 kg 7,500 120 98 0.0030

Pasir 0.0250 0.0250 45,000 1,125 1,125 0.0000

Alat bantu pemotong keramik 1.3750 1.1000 ls 500 688 550 0.2750

S u b T o t a l 63,932 51,033 0.6700

40 SP.III.15 Dinding keramik 20 x 20 1 Pc : 5 Ps (m2)

UPAH

Tukang batu 0.3400 0.2750 org/hr 30,000 10,200 8,250 0.0650

Kepala tukang batu 0.0600 0.0500 org/hr 32,000 1,920 1,600 0.0100

Pekerja 0.1800 0.1500 org/hr 18,000 3,240 2,700 0.0300

BAHAN

Keramik dinding 20/20 1.2500 1.0000 37,500 46,875 37,500 0.2500

PC (50 kg) 0.1750 0.1400 zak 34,000 5,950 4,760 0.0350

Semen warna 0.0160 0.0130 kg 7,500 120 98 0.0030

Pasir 0.0300 0.0250 45,000 1,350 1,125 0.0050

Alat bantu pemotong keramik 1.3750 1.1000 ls 500 688 550 0.2750

S u b T o t a l 70,343 56,583 0.6730

41 X.1 Pasangan bata merah kosong (m3)

UPAH

Tukang batu 1.50 1.20 org/hr 30,000 45,000 36,000 0.3000

Kepala tukang batu 0.15 0.12 org/hr 32,000 4,800 3,840 0.0300

Pekerja 4.50 3.60 org/hr 18,000 81,000 64,800 0.9000

BAHAN

Bata merah 650 650 buah 175 113,750 113,750 0.0000

S u b T o t a l 244,550 218,390 1.2300

42 X.2 Pekerjaan septictank & peresapan (1 unit)

1. Galian tanah 15.70 15.70 11,050 173,496 173,496 0.0000

2. Urugan tanah kembali 3.94 3.94 4,752 18,723 18,723 0.0000

3. Urugan pasir 0.41 0.41 33,480 13,827 13,827 0.0000

4. Pasangan bata trasraam 1 Pc : 3 Ps 4.47 4.47 342,432 1,530,671 1,530,671 0.0000

5. Pasangan bata kosong 1.18 1.18 218,390 257,263 257,263 0.0000

6. Plesteran 1 Pc : 3 Ps 15.92 15.92 18,020 286,952 286,952 0.0000

7. Beton plat penutup tebal 8 cm 0.57 0.57 2,381,650 1,362,542 1,362,542 0.0000

8. Pipa galvanis iron diameter 1,5" 2.75 2.75 m' 32,500 89,375 89,375 0.0000

9. Tee 1,5" 1.00 1.00 buah 5,000 5,000 5,000 0.0000

10. Knee 1,5" 2.00 2.00 buah 5,000 10,000 10,000 0.0000

11. Pipa PVC diameter 3" 31.00 8.00 m' 33,000 1,023,000 264,000 23.0000

12. Kerikil 1.17 1.17 60,000 69,960 69,960 0.0000

13. Ijuk 10 10 kg 5,000 50,000 50,000 0.0000

S u b T o t a l 4,890,810 4,131,810 23.0000

43 X.3 Pekerjaan saluran samping tertutup (m')

1. Galian tanah 0.55 0.44 11,050 6,078 4,862 0.1100

2. Pasangan bata trasraam 1 Pc : 3 Ps 0.17 0.14 342,432 57,785 46,228 0.0338

3. Plesteran 1 Pc : 3 Ps 0.63 0.50 18,020 11,263 9,010 0.1250

4. Buis beton 1/2 diameter 30 cm 1.25 1.00 m' 14,000 17,500 14,000 0.2500

5. Plat penutup beton cetak 1.25 1.00 m' 6,726 8,408 6,726 0.2500

S u b T o t a l 101,033 80,826 0.7687

m2

m3

m2

m3

m3

m3

m3

m3

m3

m2

m3

m3

m3

m3

m2

Page 15: Rab RKB MI 2013wf

No. Kode U r a i a n Koef. K. Red. Satuan Harga Sat. (Rp.) Jumlah (Rp.) Jlh. Red. (Rp.) Deviasi Red.

44 X.4 Pekerjaan saluran samping terbuka (m')

1. Pasangan batu 1 Pc : 4 Ps 0.22 0.18 179,700 40,432 32,346 0.0450

2. Plesteran 1 Pc : 3 Ps 1.53 1.22 18,020 27,481 21,985 0.3050

3. Buis beton 1/2 diameter 30 cm 0.75 0.60 m' 14,000 10,500 8,400 0.1500

S u b T o t a l 78,413 62,731 0.5000

45 X.5 Pasangan pagar depan sekolah (m')

1. Galian tanah 0.8260 0.8260 11,050 9,127 9,127 0.0000

2. Urugan tanah kembali 0.2070 0.2070 4,752 984 984 0.0000

3. Urugan pasir pondasi 0.1000 0.1000 33,480 3,348 3,348 0.0000

4. Pasangan batu kosong 0.2000 0.2000 51,075 10,215 10,215 0.0000

5. Pasangan batu kali 1 Pc : 4 Ps 0.3300 0.3300 179,700 59,301 59,301 0.0000

6. Pasangan bata 1 Pc : 4 Ps 0.2230 0.2230 322,782 71,980 71,980 0.0000

7. Pasangan beton sloof 10/10 0.0100 0.0100 3,264,050 32,641 32,641 0.0000

8. Pasangan beton ring 10/10 0.0100 0.0100 3,264,050 32,641 32,641 0.0000

9. Pasangan beton kolom 10/10 0.0050 0.0050 3,264,050 16,320 16,320 0.0000

10. Pekerjaan plesteran 1 Pc : 3 Ps 1.0000 1.0000 18,020 18,020 18,020 0.0000

11. Pekerjaan pengecatan 1.0000 1.0000 9,180 9,180 9,180 0.0000

S u b T o t a l 263,757 263,757 0.0000

46 X.6 Pasangan pagar kawat berduri (m')

1. Galian tanah 0.1100 0.1100 11,050 1,216 1,216 0.0000

2. Urugan pasir 0.1100 0.1100 33,480 3,683 3,683 0.0000

3. Pasangan batu kali 1 Pc : 4 Ps 0.1300 0.1300 179,700 23,361 23,361 0.0000

4. Besi siku 0.8600 0.8600 m' 5,000 4,300 4,300 0.0000

5. Kawat berduri 6.5000 6.0000 m' 1,200 7,800 7,200 0.5000

6. Kawat pengikat 0.0050 0.0050 kg 7,000 35 35 0.0000

S u b T o t a l 40,394 39,794 0.5000

47 G.42 Paving block (m2)

UPAH

Tukang batu 0.4290 0.3432 org/hr 30,000 12,870 10,296 0.0858

Kepala tukang batu 0.0429 0.0343 org/hr 32,000 1,373 1,098 0.0086

Pekerja 0.8580 0.6864 org/hr 18,000 15,444 12,355 0.1716

BAHAN

Paving block 36.0000 36.0000 buah 800 28,800 28,800 0.0000

PC (50 kg) 0.0248 0.0198 zak 34,000 843 675 0.0050

Pasir 0.1260 0.1008 45,000 5,670 4,536 0.0252

0.0000

S u b T o t a l 65,000 57,760 0.2961

48 F.36.b Partisi Multiplex (m2)

UPAH

Tukang batu 3.0000 2.4000 org/hr 30,000 90,000 72,000 0.6000

Kepala tukang batu 0.3000 0.2400 org/hr 32,000 9,600 7,680 0.0600

Pekerja 1.2500 1.0000 org/hr 18,000 22,500 18,000 0.2500

BAHAN

Engsel 3.0000 2.0000 bh 5,000 15,000 10,000 1.0000

Kayu klas II 0.0240 0.0240 1,450,000 34,800 34,800 0.0000

Triplek 3 mm 1.2500 1.2500 lembar 34,500 43,125 43,125 0.0000

Paku 0.7500 0.7500 kg 8,500 6,375 6,375 0.0000

S u b T o t a l 221,400 191,980 1.9100

49 X.7 Pekerjaan bak kontrol (1 unit)

1. Galian tanah 1.5363 1.2290 11,050 16,976 13,580 0.3073

2. Urugan tanah kembali 0.4624 0.3699 4,752 2,197 1,758 0.0925

3. Urugan pasir pondasi 0.0438 0.0350 33,480 1,465 1,172 0.0088

4. Pasangan bata 1 Pc : 4 Ps 0.1513 0.1210 322,782 48,821 39,057 0.0303

5. Pekerjaan plesteran 1 Pc : 3 Ps 0.0637 0.0510 18,020 1,149 919 0.0127

S u b T o t a l 70,607 56,486 0.4515

m3

m2

m3

m3

m3

m3

m3

m3

m3

m3

m3

m2

m2

m3

m3

m3

m3

m3

m3

m3

m3

m3

m2

Page 16: Rab RKB MI 2013wf

No. Kode U r a i a n Koef. K. Red. Satuan Harga Sat. (Rp.) Jumlah (Rp.) Jlh. Red. (Rp.) Deviasi Red.

50 X.8 Bangunan selasar penghubung (m')

BAHAN

Galian tanah 2.3040 1.9200 11,050 25,459 21,216 0.3840

Urugan tanah kembali 1.2480 1.0400 4,752 5,930 4,942 0.2080

Pasangan batu kali 1Pc : 4 Ps (m3) 1.0560 0.8800 179,700 189,763 158,136 0.1760

Pasangan Triplek 3 mm 1.4160 1.1800 lembar 34,500 48,852 40,710 0.2360

Kayu klas II 0.0723 0.0579 1,450,000 104,853 83,883 0.0145

Pasangan beton rabat 1 Pc : 3 Ps : 5 Kr 0.3750 0.3000 286,570 107,464 85,971 0.0750

Pekerjaan pengecatan 2.6675 2.1340 19,205 51,229 40,983 0.5335

Listplank kayu klas II 0.4375 0.3500 37,560 16,433 13,146 0.0875

Paku 0.3125 0.2500 kg 8,500 2,656 2,125 0.0625

Baut mur 2.0000 2.0000 buah 5,000 10,000 10,000 -

Genteng pejaten 90.000 90.000 buah 680 61,200 61,200 -

Bumbungan pejaten 5.1000 5.1000 buah 2,500 12,750 12,750 -

UPAH

Pekerja 0.9375 0.7500 org/hr 18,000 16,875 13,500 0.1875

Tukang Kayu 0.6250 0.5000 org/hr 30,000 18,750 15,000 0.1250

Kepala Tukang Kayu 0.3125 0.2500 org/hr 32,000 10,000 8,000 0.0625

S u b T o t a l 682,215 571,562 1.1480

51 X.2.a Pekerjaan septictank & peresapan (1 unit)1. Galian tanah 6.22 6.22 11,050 68,731 68,731 0.00002. Urugan tanah kembali 2.07 2.07 4,752 9,851 9,851 0.00003. Urugan pasir 0.31 0.31 33,480 10,513 10,513 0.00004. Pasangan bata trasraam 1 Pc : 3 Ps 0.59 0.59 342,432 201,692 201,692 0.00005. Pasangan bata kosong 1.18 1.18 218,390 257,263 257,263 0.00006. Plesteran 1 Pc : 3 Ps 15.92 15.92 18,020 286,952 286,952 0.00007. Beton plat penutup tebal 8 cm 0.72 0.72 2,381,650 1,707,643 1,707,643 0.00008. Pipa PVC diameter 3" 6.00 6.00 m' 33,000 198,000 198,000 0.00009. Kerikil 1.25 1.25 60,000 74,700 74,700 0.000010. Ijuk 0.974 1 kg 5,000 4,870 4,870 0.0000

S u b T o t a l 2,820,216 2,820,216 0.0000

52 SP.VII.7 Pekerjaan plafond triplek 3 mm (m2)UPAHTukang kayu 0.5000 0.3300 org/hr 30,000 15,000 9,900 0.1700Kepala tukang kayu 0.0413 0.0330 org/hr 32,000 1,320 1,056 0.0083Pekerja 0.0625 0.0500 org/hr 18,000 1,125 900 0.0125BAHANKayu klas II 0.0170 0.0150 1,450,000 24,650 21,750 0.0020Paku 0.0125 0.0100 kg 8,500 106 85 0.0025Triplek 3 mm 0.8000 0.7000 lembar 34,500 27,600 24,150 0.1000

S u b T o t a l 69,801 57,841 0.2953

m3

m3

m3

m3

m3

m2

m2

m3

m3

m3

m3

m3

m2

m3

m3

m3

Page 17: Rab RKB MI 2013wf

RENCANA ANGARAN BIAYA

PEKERJAAN : Pembangunan Ruang Kelas Baru (RKB)

MI An Nabawiyyah NW GelanggangLOKASI PEKERJAAN : Jl. Arwah SombeDESA/ KECAMATAN : Gelanggang / Sakra TimurKABUPATEN : Lombok TimurTAHUN ANGGARAN : 2012/2013PROPINSI : Nusa Tenggara Barat

RENCANA ANGGARAN BIAYA

No. Uraian PekerjaanKode

Volume SatuanHarga Jumlah

AnalisaSatuan Harga

(Rupiah) (Rupiah)

I PEKERJAAN PERSIAPAN1 Sewa molen, mobilisasi dan demobilisasi alat - 1.00 ls 2,000,000 2,000,000 2 Uitzet pengukuran, pembuatan bouwplank - 1.00 ls 1,000,000 1,000,000 3 Penyediaan air kerja - 1.00 ls 1,000,000 1,000,000 4 Pembuatan direksi keet dan gudang - 1.00 ls 1,500,000 1,500,000 6 Honor Logistik dan Pelaksana Sipil/ Finishing - 5.00 org/bln 600,000 3,000,000 7 Honor Pelaksana Mekanikal dan Elektrikal - 3.00 org/bln 500,000 1,500,000

TOTAL I. 10,000,000

II RUANG KELAS TIPE I (6 RUANG KELAS)A. PEKERJAAN TANAH DAN PASIR

1 Galian tanah A.1 315.400 11,050 3,485,170 2 Urugan tanah kembali A.6 53.860 4,752 255,943 3 Urugan pasir bawah pondasi dan lantai A.12 32.500 33,480 1,088,100 4 Pembuangan tanah sisa galian A.8 161.540 4,752 767,638 5 Urugan tanah peninggian lantai disiram A.11 194.400 40,320 7,838,208 6 Pekerjaan anti rayap - 60.000 15,000 900,000

TOTAL II. A. 14,335,059

B. PEKERJAAN PONDASI DAN BETON 1 Pasangan batu kosong G.2 46.080 51,075 2,353,536 2 Pasangan batu kali 1Pc : 4 Ps G.32.h 106.630 179,700 19,161,411 3 Pasangan rolag bata G.33.L 3.435 342,432 1,176,254 4 Pekerjaan sloof 13/15 (200 kg/ m3) V.c 3.198 2,381,650 7,616,517 5 Pekerjaan kolom praktis 10/10 (300 kg/m3) V.e 1.576 3,264,050 5,144,143 6 Pekerjaan kolom selasar 15/15 (175 kg/m3) V.b 1.576 2,161,050 3,405,815 7 Pekerjaan kolom struktur 15/20 (250 kg/m3) V.d 4.300 2,822,850 12,138,255 8 Pekerjaan ring balok 13/15 (200 kg/m3) V.c 5.617 2,381,650 13,377,728 9 Pekerjaan beton konsol 13/15 (200 kg/m3) V.c 1.170 2,381,650 2,786,531 10 Pekerjaan ring balok latai 10/10 (300 kg/m3) V.e 1.200 3,264,050 3,916,860 11 Pekerjaan balok beton penggantung partisi 15/30 V.c 0.315 2,381,650 750,220

TOTAL II. B. 71,827,269

C. PEKERJAAN LANTAI 1 Pekerjaan rabat beton 1:3:5 tebal 5 cm G.43.a 31.900 286,570 9,141,583 2 Pekerjaan lantai keramik 30/30 SP.III.16 493.800 51,033 25,199,849

TOTAL II. C. 34,341,432

D. PEKERJAAN DINDING 1 Pasangan bata 1 Pc : 4 Ps G.33.b 94.870 322,782 30,622,328 2 Pasangan trasram 1 Pc : 3 Ps G.33.L 9.830 342,432 3,366,107

TOTAL II. D. 33,988,435

m3

m3

m3

m3

m3

m2

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m2

m3

m3

Page 18: Rab RKB MI 2013wf

No. Uraian PekerjaanKode

Volume SatuanHarga Jumlah

AnalisaSatuan Harga

(Rupiah) (Rupiah)

E. PEKERJAAN KAYU 1 Kuda-kuda, gording / kap kayu klas II F.22 11.520 2,364,640 27,240,653 2 Usuk kayu klas I, reng kayu klas II F.16.a 751.300 27,981 21,022,125 3 Listplank kayu klas I F.21 66.000 37,560 2,478,960 4 Kusen kayu klas II F.27 3.170 2,740,960 8,688,843 5 Papan reuter kayu klas II F.21.a 0.226 29,190 6,597 6 Daun jendela kaca F.36 29.650 261,720 7,759,998 7 Daun pintu panil F.36.a 21.650 239,590 5,187,124 8 Kaca mati tebal 5 mm - 14.851 55,000 816,794 9 Krepyak kayu klas II F.21.b 1.620 119,540 193,655 10 Partisi Multiplek F.36.b 15.000 191,980 2,879,700 11 Kisi-kisi F.21.b 18.550 119,540 2,217,467

TOTAL II. E. 78,491,916

F. PEKERJAAN PLESTERAN 1 Plesteran dinding bata 1 Pc : 4 Ps G.50.r 1,544.330 17,272 26,673,050 2 Plesteran trasram 1 Pc : 3 Ps G.50.q 783.100 18,020 14,111,540

SUB TOTAL II. F. 40,784,590

G. PEKERJAAN ATAP/ PLAFOND 1 Atap Genteng H.5.c 881.900 24,550 21,650,645 2 Bubungan Genteng H.6.c 110.520 m' 23,432 2,589,705 3 Plafon triplek 3 mm SP.VII.6 346.540 41,416 14,352,301 4 List plafond - 538.800 m' 6,500 3,502,200

SUB TOTAL II. G. 42,094,850

H. PEKERJAAN BESI/ BAJA 1 Kunci tanam union (dua slag) - 10.000 buah 55,000 550,000 2 Engsel pintu nylon - 48.000 buah 5,000 240,000 3 Engsel jendela nylon - 96.000 buah 4,000 384,000 4 Hak angin - 96.000 buah 3,000 288,000 5 Grendel jendela - 96.000 buah 2,500 240,000 6 Grendel tanam pintu - 6.000 buah 10,000 60,000 7 Ekspagnolet - 6.000 buah 29,000 174,000 8 Angkur - 168.000 buah 600 100,800 9 Begel plat - 96.000 buah 8,500 816,000 10 Begel sudut - 24.000 buah 9,000 216,000 11 Begel U - 12.000 buah 10,000 120,000 12 Baut mur dia14 mm - 15 - 264.000 buah 3,000 792,000 13 Baut mur dia14 mm - 20 - 152.000 buah 4,000 608,000 14 Baut mur dia14 mm - 25 - 48.000 buah 5,000 240,000

SUB TOTAL II. H. 4,828,800

I. PEKERJAAN PENGECATAN 1 Pekerjaan pengecatan kayu SP.IX.a 235.320 19,205 4,519,321 2 Pekerjaan pengecatan tembok, kolom dan plafond SP.IX 1,191.650 9,180 10,939,347 3 Pekerjaan teer arang K.35 1,200.100 2,715 3,258,271

SUB TOTAL II. I. 18,716,939

J. PEKERJAAN INSTALASI LISTRIK 1 Titik lampu - 23.000 titik 85,000 1,955,000 2 Lampu TL 1 x 20 watt - 36.000 buah 45,000 1,620,000 3 Lampu pijar 25 watt - 8.000 buah 3,250 26,000 4 Saklar tunggal - 2.000 buah 8,000 16,000 5 Saklar double - 6.000 buah 11,500 69,000 6 Sekring box - 2.000 buah 55,000 110,000 7 Stop kontak tanam - 6.000 titik 65,000 390,000 8 Arde - 1.000 titik 55,000 55,000

SUB TOTAL II. J. 4,241,000

K. PEKERJAAN LAIN-LAIN 1 Pembuatan saluran air hujan keliling bangunan X.4 95.300 m' 62,731 5,978,219 2 Bak kontrol X.7 8.000 buah 56,486 451,885

SUB TOTAL II. K. 6,430,104 T O T A L II. 360,080,393

m3

m2

m2

m3

m3

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

Page 19: Rab RKB MI 2013wf

NO. URAIAN PEKERJAAN KODE JUMLAHHARGA SATUAN

(Rp.)XXII MEUBELLER

1 Meja Siswa Tunggal M.01 105.00 bh 135,000 2 Meja Guru M.07 16.00 bh 325,000 3 Kursi Siswa K.01 105.00 bh 120,000 4 Kursi Guru K.05 16.00 bh 175,000 5 Papan Tulis Gantung P.01 6.00 bh 350,000 6 Papan Absen P.10 6.00 bh 200,000 7 Kotak Sampah KS 12.00 bh 50,000

Jumlah

Gelanggang, 29 Agustus 2010

Ketua Lembaga Pendidikan

Darul Hasyimi Nahdlatul Wathan Gelanggang

TGH.M.MUZAYYIN SHOBRI, SHI

Page 20: Rab RKB MI 2013wf

JUMLAHHARGA

(Rp.)

14,175,000 5,200,000 12,600,000 2,800,000 2,100,000 1,200,000 600,000

38,675,000

Gelanggang, 29 Agustus 2010

Ketua Lembaga Pendidikan

Darul Hasyimi Nahdlatul Wathan Gelanggang

TGH.M.MUZAYYIN SHOBRI, SHI

Page 21: Rab RKB MI 2013wf

REKAPITULASI

RENCANA ANGGARAN BIAYA PEKERJAAN : Pembangunan SMP NW GelanggangLOKASI PEKERJAAN : Jl. Arwah Sombe, Gelanggang Sakra TimurTAHUN ANGGARAN : 2010/2011

No. Uraian PekerjaanJumlahHarga

(Rupiah)

I PEKERJAAN PERSIAPAN Sudah terlaksanaII RUANG KELAS TIPE I (3 RUANG KELAS)(7 x 8)

A. PEKERJAAN TANAH DAN PASIR Sudah terlaksana B. PEKERJAAN PONDASI DAN BETON Sudah terlaksana C. PEKERJAAN LANTAI 17,476,241.70 D. PEKERJAAN DINDING 10,373,750.46 E. PEKERJAAN KAYU 40,609,881.84 F. PEKERJAAN PLESTERAN 7,793,190.96 G. PEKERJAAN ATAP/ PLAFOND 24,857,628.12 H. PEKERJAAN BESI/ BAJA 1,909,500.00 I. PEKERJAAN PENGECATAN 10,923,630.00 J. PEKERJAAN INSTALASI LISTRIK 2,442,000.00 K. PEKERJAAN LAIN-LAIN 3,362,468.75

JUMLAH TOTAL 119,748,291.83

DIBULATKAN 119,750,000.00

Terbilang : Seratus Sembilan Belas Juta Tujuh Ratus Lima Pulu Ribu Rupiah

Gelanggang, 30 Juli 2010Mengetahui, Lembaga Pendidikan Sekertaris Darul Hasyimi NW Gelanggang

Ketua

H. IDRUS, S Pd. H.M.MUZAYYIN SHOBRI, SHI NIP -

Page 22: Rab RKB MI 2013wf

RENCANA ANGGARAN BIAYA

PEKERJAAN : Pembangunan SMP NW GelanggangLOKASI PEKERJAAN : Jl. Arwah Sombe, Gelanggang Sakra TimurTAHUN ANGGARAN : 2008/2009

No. Uraian PekerjaanKode

Volume SatuanHarga Jumlah

AnalisaSatuan Harga

(Rupiah) (Rupiah)

I PEKERJAAN PERSIAPAN1 Sewa molen, mobilisasi dan demobilisasi alat - 1.00 ls 1,500,000 1,500,000 2 Uitzet pengukuran, pembuatan bouwplank - 1.00 ls 1,000,000 1,000,000 3 Penyediaan air kerja - 1.00 ls 1,000,000 1,000,000 4 Pembuatan direksi keet dan gudang - 1.00 ls 2,000,000 2,000,000 5 Penyambungan listrik PLN - 1.00 ls 3,250,000 3,250,000

TOTAL I. 8,750,000

II RUANG KELAS TIPE I (3 RUANG KELAS)(7 x 8)A. PEKERJAAN TANAH DAN PASIR

1 Galian tanah A.1 97.000 11,050 1,071,850 2 Urugan tanah kembali A.6 20.000 4,752 95,040 3 Urugan pasir bawah pondasi dan lantai A.12 12.560 33,480 420,509 4 Pembuangan tanah sisa galian A.8 52.360 4,752 248,815 5 Urugan tanah peninggian lantai disiram A.11 55.230 40,320 2,226,874

TOTAL II. A. 4,063,087

B. PEKERJAAN PONDASI DAN BETON 1 Pasangan batu kosong G.2 26.356 51,075 1,346,133 2 Pasangan batu kali 1Pc : 4 Ps G.32.h 45.189 179,700 8,120,463 3 Pasangan rolag bata G.33.L 6.589 342,432 2,256,284 4 Pekerjaan sloof 13/15 (200 kg/ m3) V.c 4.256 2,381,650 10,136,302 5 Pekerjaan kolom praktis 10/10 (300 kg/m3) V.e 3.256 3,264,050 10,627,747 6 Pekerjaan kolom selasar 15/15 (175 kg/m3) V.b 2.560 2,161,050 5,532,288 7 Pekerjaan kolom struktur 15/20 (250 kg/m3) V.d 4.200 2,822,850 11,855,970 8 Pekerjaan ring balok 13/15 (200 kg/m3) V.c 2.135 2,381,650 5,084,823 9 Pekerjaan beton konsol 13/15 (200 kg/m3) V.c 1.300 2,381,650 3,096,145 10 Pekerjaan ring balok latai 10/10 (300 kg/m3) V.e 6.458 3,264,050 21,079,235 11 Pekerjaan balok beton penggantung partisi 15/30 V.c 0.315 2,381,650 750,220

TOTAL II. B. 79,885,610

C. PEKERJAAN LANTAI 1 Pekerjaan rabat beton 1:3:5 tebal 5 cm G.43.a 15.360 286,570 4,401,715 2 Pekerjaan lantai keramik 30/30 SP.III.16 256.200 51,033 13,074,527

TOTAL II. C. 17,476,242

D. PEKERJAAN DINDING 1 Pasangan bata 1 Pc : 4 Ps G.33.b 25.890 322,782 8,356,826 2 Pasangan trasram 1 Pc : 3 Ps G.33.L 5.890 342,432 2,016,924

TOTAL II. D. 10,373,750

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m2

m3

m3

Page 23: Rab RKB MI 2013wf

No. Uraian PekerjaanKode

Volume SatuanHarga Jumlah

AnalisaSatuan Harga

(Rupiah) (Rupiah)

E. PEKERJAAN KAYU 1 Kuda-kuda, gording / kap kayu klas II F.22 6.250 2,364,640 14,779,000 2 Usuk kayu klas I, reng kayu klas II F.16.a 386.000 27,981 10,800,666 3 Listplank kayu klas I F.21 40.360 37,560 1,515,922 4 Kusen kayu klas II F.27 1.000 2,740,960 2,740,960 5 Papan reuter kayu klas II F.21.a 0.116 29,190 3,386 6 Daun jendela kaca F.36 13.000 261,720 3,402,360 7 Daun pintu panil F.36.a 10.000 239,590 2,395,900 8 Kaca mati tebal 5 mm - 8.500 55,000 467,500 9 Krepyak kayu klas II F.21.b 2.180 119,540 260,597 10 Partisi Multiplek F.36.b 13.580 191,980 2,607,088 11 Kisi-kisi F.21.b 13.690 119,540 1,636,503

TOTAL II. E. 40,609,882

F. PEKERJAAN PLESTERAN 1 Plesteran dinding bata 1 Pc : 4 Ps G.50.r 389.000 17,272 6,718,652 2 Plesteran trasram 1 Pc : 3 Ps G.50.q 59.630 18,020 1,074,539

SUB TOTAL II. F. 7,793,191

G. PEKERJAAN ATAP/ PLAFOND 1 Atap genteng Pejaten Bali H.5.c 368.360 24,550 9,043,238 2 Bubungan Pejaten Bali H.6.c 50.360 m' 23,432 1,180,036 3 Plafon triplek 3 mm SP.VII.6 305.600 41,416 12,656,730 4 List plafond - 304.250 m' 6,500 1,977,625

SUB TOTAL II. G. 24,857,628

H. PEKERJAAN BESI/ BAJA 1 Kunci tanam union (dua slag) - 4.000 buah 55,000 220,000 2 Engsel pintu nylon - 20.000 buah 5,000 100,000 3 Engsel jendela nylon - 45.000 buah 4,000 180,000 4 Hak angin - 45.000 buah 3,000 135,000 5 Grendel jendela - 45.000 buah 2,500 112,500 6 Grendel tanam pintu - 3.000 buah 10,000 30,000 7 Ekspagnolet - 3.000 buah 29,000 87,000 8 Angkur - 80.000 buah 600 48,000 9 Begel plat - 28.000 buah 8,500 238,000 10 Begel sudut - 14.000 buah 9,000 126,000 11 Begel U - 6.000 buah 10,000 60,000 12 Baut mur dia14 mm - 15 - 100.000 buah 3,000 300,000 13 Baut mur dia14 mm - 20 - 12.000 buah 4,000 48,000 14 Baut mur dia14 mm - 25 - 45.000 buah 5,000 225,000

SUB TOTAL II. H. 1,909,500

I. PEKERJAAN PENGECATAN 1 Pekerjaan pengecatan kayu SP.IX.a 171.000 19,205 3,284,055 2 Pekerjaan pengecatan tembok, kolom dan plafond SP.IX 658.000 9,180 6,040,440 3 Pekerjaan teer arang K.35 589.000 2,715 1,599,135

SUB TOTAL II. I. 10,923,630

J. PEKERJAAN INSTALASI LISTRIK 1 Titik lampu - 18.000 titik 85,000 1,530,000 2 Lampu TL 1 x 20 watt - 12.000 buah 45,000 540,000 3 Lampu pijar 25 watt - 4.000 buah 3,250 13,000 4 Saklar tunggal - 1.000 buah 8,000 8,000 5 Saklar double - 4.000 buah 11,500 46,000 6 Sekring box - 1.000 buah 55,000 55,000 7 Stop kontak tanam - 3.000 titik 65,000 195,000 8 Arde - 1.000 titik 55,000 55,000

SUB TOTAL II. J. 2,442,000

K. PEKERJAAN LAIN-LAIN 1 Pembuatan saluran air hujan keliling bangunan X.4 50.000 m' 62,731 3,136,526 2 Bak kontrol X.7 4.000 buah 56,486 225,943

SUB TOTAL II. K. 3,362,469

m3

m2

m2

m3

m3

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

Page 24: Rab RKB MI 2013wf

MejaEE

No Jenis Kode Harga Harga Harga1 Meja siswa Tunggal M-1 135,000 135,000 140,000 2 Meja siswa Ganda M-2 250,000 250,000 250,000 3 Meja Baca Individu M-3 295,000 295,000 300,000 4 Meja Baca Kelompok M-4 275,000 275,000 275,000 5 Meja Baca Serbaguna M-5 200,000 200,000 200,000 6 Meja Pimpinan M-6 550,000 550,000 550,000 7 Meja Guru M-7 325,000 325,000 325,000 8 Meja kerja M-8 275,000 275,000 275,000 9 Meja sidang M-9 250,000 250,000 250,000

10 Meja sirkulasi M-10 350,000 350,000 350,000 11 Meja demonstrasi M-11 400,000 400,000 400,000 12 Meja ketik M-12 175,000 175,000 175,000 13 Meja Tamu M-13 325,000 325,000 350,000

Kursi14 Kursi siswa tungga K-1 120,000 125,000 120,000 15 Kursi bulat tinggi K-2 85,000 85,000 85,000 16 Kursi bulat pendek K-3 75,000 75,000 75,000 17 Kursi pimpinan K-4 850,000 850,000 850,000 18 Kursi kerja K-5 175,000 175,000 175,000 19 Kursi lipat K-6 175,000 175,000 175,000 20 Kursi putar K-7 700,000 700,000 700,000 21 Kursi tamu K-8 175,000 175,000 175,000 22 Kursi panjang K-9 275,000 275,000 275,000

Lemari23 Lemari buku L-1 800,000 800,000 800,000 24 Lemari kaca geser L-2 650,000 650,000 650,000 25 Lemari arsip L-3 800,000 800,000 800,000 26 Lemari pembatas L-4 750,000 750,000 750,000 27 Lemari administrasi L-5 500,000 500,000 500,000 28 Lemari alat peraga L-6 750,000 750,000 750,000 29 Lemari kaca geser L-7 650,000 650,000 650,000 30 Lemari besi L-8 500,000 500,000 500,000 31 Lemari etalase pendek L-9 675,000 675,000 675,000 32 Lemari kertas kerja L-10 1,100,000 1,100,000 1,100,000 33 Lemari katalog L-11 750,000 750,000 750,000 34 Lemari kardek L-12 475,000 475,000 475,000 35 Lemari kaca tinggi L-13 775,000 775,000 775,000 36 Lemari gantung / P3K L-14 300,000 300,000 300,000 37 Lemari kunci L-15 350,000 350,000 350,000 38 Lemari locker L-16 900,000 900,000 900,000 39 Lemari pakaian guru L-17 550,000 550,000 550,000 40 Lemari pakaian siswa L-18 550,000 550,000 550,000 41 Lemari pakaian guru L-19 775,000 775,000 775,000 42 Lemari asam L-20 700,000 700,000 700,000

Page 25: Rab RKB MI 2013wf

Rak43 Rak Tas R-1 1,050,000 1,050,000 1,050,000 44 Rak buku satu muka R-2 800,000 800,000 800,000 45 Rak buku dua muka R-3 1,150,000 1,150,000 1,150,000 46 Rak gudang R-4 775,000 775,000 775,000 47 Rak rekaman R-5 950,000 950,000 950,000 48 Rak majalah R-6 725,000 725,000 725,000 49 Rak Atlas R-7 450,000 450,000 450,000 50 Rak ensiklopedia R-8 275,000 275,000 275,000 51 Rak koran R-9 300,000 300,000 300,000 52 Rak dorong R-10 325,000 325,000 325,000 53 Rak piring R-11 650,000 650,000 650,000

Papan tulis54 Papan tulis gantung P-1 350,000 350,000 350,000 55 Papan tulis lipat P-2 650,000 650,000 650,000 56 Papan tulis berkaki P-3 600,000 600,000 600,000 57 White board gantung P-4 350,000 350,000 350,000 58 White board standard P-5 500,000 500,000 500,000 59 Papan statistik P-6 300,000 300,000 300,000 60 Papan jadwal P-7 300,000 300,000 300,000 61 Papan pameran P-8 700,000 700,000 700,000 62 Papan piket P-9 200,000 200,000 200,000 63 Papan absen P-10 200,000 200,000 200,000

Lain-lain64 Filling kabinet U-1 1,000,000 1,000,000 1,000,000 65 Filling kabinet 3 laci U-2 850,000 850,000 850,000 66 Filling kabinet 2 laci U-3 500,000 500,000 500,000 67 Tungku tiang bendera U-4 225,000 225,000 225,000 68 Podium U-5 750,000 750,000 750,000 69 Dipan periksa U-6 875,000 875,000 875,000 70 Dipan tunggal U-7 750,000 750,000 750,000 71 Dipan tidur ganda U-8 1,250,000 1,250,000 1,250,000 72 dipan tidur tingkat U-9 1,600,000 1,600,000 1,600,000 73 Tempat sampah KS 50,000 50,000 50,000

Page 26: Rab RKB MI 2013wf

Meja

No Jenis Kode Harga1 Meja siswa Tunggal M-1 135,000 2 Meja siswa Ganda M-2 250,000 3 Meja Baca Individu M-3 295,000 4 Meja Baca Kelompok M-4 275,000 5 Meja Baca Serbaguna M-5 200,000 6 Meja Pimpinan M-6 550,000 7 Meja Guru M-7 325,000 8 Meja kerja M-8 275,000 9 Meja sidang M-9 250,000

10 Meja sirkulasi M-10 350,000 11 Meja demonstrasi M-11 400,000 12 Meja ketik M-12 175,000 13 Meja Tamu M-13 325,000

Kursi14 Kursi siswa tungga K-1 120,000 15 Kursi bulat tinggi K-2 85,000 16 Kursi bulat pendek K-3 75,000 17 Kursi pimpinan K-4 850,000 18 Kursi kerja K-5 175,000 19 Kursi lipat K-6 175,000 20 Kursi putar K-7 700,000 21 Kursi tamu K-8 175,000 22 Kursi panjang K-9 275,000

Lemari23 Lemari buku L-1 800,000 24 Lemari kaca geser L-2 650,000 25 Lemari arsip L-3 800,000 26 Lemari pembatas L-4 750,000 27 Lemari administrasi L-5 500,000 28 Lemari alat peraga L-6 750,000 29 Lemari kaca geser L-7 650,000 30 Lemari besi L-8 500,000 31 Lemari etalase pendek L-9 675,000 32 Lemari kertas kerja L-10 1,100,000 33 Lemari katalog L-11 750,000 34 Lemari kardek L-12 475,000 35 Lemari kaca tinggi L-13 775,000 36 Lemari gantung / P3K L-14 300,000 37 Lemari kunci L-15 350,000 38 Lemari locker L-16 900,000 39 Lemari pakaian guru L-17 550,000 40 Lemari pakaian siswa L-18 550,000 41 Lemari pakaian guru L-19 775,000 42 Lemari asam L-20 700,000

Page 27: Rab RKB MI 2013wf

Rak43 Rak Tas R-1 1,050,000 44 Rak buku satu muka R-2 800,000 45 Rak buku dua muka R-3 1,150,000 46 Rak gudang R-4 775,000 47 Rak rekaman R-5 950,000 48 Rak majalah R-6 725,000 49 Rak Atlas R-7 450,000 50 Rak ensiklopedia R-8 275,000 51 Rak koran R-9 300,000 52 Rak dorong R-10 325,000 53 Rak piring R-11 650,000

Papan tulis54 Papan tulis gantung P-1 350,000 55 Papan tulis lipat P-2 650,000 56 Papan tulis berkaki P-3 600,000 57 White board gantung P-4 350,000 58 White board standard P-5 500,000 59 Papan statistik P-6 300,000 60 Papan jadwal P-7 300,000 61 Papan pameran P-8 700,000 62 Papan piket P-9 200,000 63 Papan absen P-10 200,000

Lain-lain64 Filling kabinet U-1 1,000,000 65 Filling kabinet 3 laci U-2 850,000 66 Filling kabinet 2 laci U-3 500,000 67 Tungku tiang bendera U-4 225,000 68 Podium U-5 750,000 69 Dipan periksa U-6 875,000 70 Dipan tunggal U-7 750,000 71 Dipan tidur ganda U-8 1,250,000 72 dipan tidur tingkat U-9 1,600,000 73 Tempat sampah KS 50,000

Page 28: Rab RKB MI 2013wf

RENCANA ANGARAN BIAYA

PEKERJAAN : Pengadaan Furniture USB

LOKASI PEKERJAAN : Jl. Arwah SombeDESA/ KECAMATAN : Gelanggang / Sakra TimurKABUPATEN : Lombok TimurTAHUN ANGGARAN : 2005PROPINSI : Nusa Tenggara Barat

RENCANA ANGGARAN BIAYA (RAB)

NO. URAIAN PEKERJAAN KODE JUMLAHHARGA JUMLAHSATUAN HARGA

(Rp.) (Rp.)

I RUANG TEORI (3 Ruang )1 Meja Siswa Tunggal M.01 120.00 bh 135,000 16,200,000 2 Meja Guru M.07 3.00 bh 325,000 975,000 3 Kursi Siswa K.01 120.00 bh 120,000 14,400,000 4 Kursi Guru K.05 3.00 bh 175,000 525,000 5 Papan Tulis Gantung P.01 3.00 bh 350,000 1,050,000 6 Papan Absen P.10 3.00 bh 200,000 600,000 7 Kotak Sampah KS 3.00 bh 50,000 150,000

Jumlah 33,900,000

II RUANG PERPUSTAKAAN DAN MEDIA ( 1 UNIT )1 Meja Baca Individu M.03 6.00 bh 295,000 1,770,000 2 Meja Baca Kelompok M.04 6.00 bh 275,000 1,650,000 3 Meja Guru M.07 1.00 bh 325,000 325,000 4 Meja Sirkulasi M.10 2.00 bh 350,000 700,000 5 Meja Ketik M.12 1.00 bh 175,000 175,000 6 Kursi Siswa K.01 51.00 bh 120,000 6,120,000 7 Kursi Kerja K.05 2.00 bh 175,000 350,000 8 Lemari Buku L.01 3.00 bh 800,000 2,400,000 9 Lemari Katalog L.11 1.00 bh 750,000 750,000

10 Lemari Kardek L.12 1.00 bh 475,000 475,000 11 Rak Tas/Barang R.01 3.00 bh 1,050,000 3,150,000 12 Rak Buku Satu Muka R.02 2.00 bh 800,000 1,600,000 13 Rak Buku Dua Muka R.03 1.00 bh 1,150,000 1,150,000 14 Rak Gudang R.04 1.00 bh 775,000 775,000 15 Rak Majalah R.06 1.00 bh 725,000 725,000 16 Rak Atlas R.07 1.00 bh 450,000 450,000 17 Rak Ensiklopedi R.08 1.00 bh 275,000 275,000 18 Rak Koran R.09 1.00 bh 300,000 300,000 19 Rak Dorong R.10 2.00 bh 325,000 650,000 20 White Boad Gantung P.04 1.00 bh 350,000 350,000 21 Papan Pameran P.08 1.00 bh 700,000 700,000 22 Kotak Sampah KS 1.00 bh 50,000 50,000

Jumlah 24,890,000

III RUANG KANTOR ( 1 UNIT )RUANG KEPALA SEKOLAH, TATA USAHA DAN GURU

1 Meja Kerja Pimpinan M.06 1.00 bh 550,000 550,000 2 Meja Guru M.07 13.00 bh 325,000 4,225,000 3 Meja Tamu M.13 2.00 bh 325,000 650,000 3 Lemari Buku L.01 1.00 bh 800,000 800,000 4 Lemari Kaca Geser L.02 1.00 bh 650,000 650,000 5 Lemari Kunci L,15 1.00 bh 350,000 350,000 6 Lemari Loker L.16 1.00 bh 900,000 900,000 7 Kursi Hadap K.01 4.00 bh 120,000 480,000 8 Kursi Kerja Pimpinan K.04 1.00 bh 850,000 850,000 9 Kursi Kerja K.05 13.00 bh 175,000 2,275,000

10 Kursi Lipat K.06 4.00 bh 175,000 700,000 11 Kursi Tamu K.08 8.00 bh 175,000 1,400,000

Page 29: Rab RKB MI 2013wf

12 Papan Tulis Gantung P.01 1.00 bh 350,000 350,000 13 White Boad Gantung P.04 1.00 bh 350,000 350,000

Page 30: Rab RKB MI 2013wf

NO. URAIAN PEKERJAAN KODE JUMLAHHARGA JUMLAHSATUAN HARGA

(Rp.) (Rp.)14 Papan Statistik P.06 2.00 bh 300,000 600,000 15 Papan Jadwal P.07 1.00 bh 300,000 300,000 16 Papan Pameran P.08 2.00 bh 700,000 1,400,000 17 Tungku Tiang Bendera U.04 1.00 bh 225,000 225,000 18 Kotak Sampah KS 3.00 bh 50,000 150,000

Jumlah 17,205,000 IV. RUANG BK, UKS, OSIS DAN PRAMUKA1 Meja Serbaguna M.05 6.00 bh 200,000 1,200,000 2 Meja Guru M.07 3.00 bh 325,000 975,000 3 Meja Tamu M.13 2.00 bh 325,000 650,000 4 Kursi Siswa K.01 15.00 bh 120,000 1,800,000 5 Kursi Kerja K.05 3.00 bh 175,000 525,000 6 Kursi Tamu K.08 4.00 bh 175,000 700,000 7 Lemari Buku L.01 1.00 bh 800,000 800,000 8 Lemari Kaca Geser L.02 1.00 bh 650,000 650,000 9 Lemari Pembatas L.04 1.00 bh 750,000 750,000

10 Lemari Obat L.07 1.00 bh 650,000 650,000 11 White Boad Gantung P.04 1.00 bh 350,000 350,000 12 Papan Jadwal P.07 1.00 bh 300,000 300,000 13 Papan Piket P.09 1.00 bh 200,000 200,000 14 Filling Cabinet U.01 1.00 bh 1,000,000 1,000,000 15 Tungku Tiang Bendera U.04 1.00 bh 225,000 225,000 16 Dipan Periksa U.06 1.00 bh 875,000 875,000

.

Jumlah 11,650,000 V LABORATORIUM SAINS, TI DAN K1 Meja Serbaguna M.05 20.00 bh 200,000 4,000,000 2 Meja Guru M.07 2.00 bh 325,000 650,000 3 Meja Demonstrasi M.11 1.00 bh 400,000 400,000 4 Kursi Siswa K.01 2.00 bh 120,000 240,000 5 Kursi Bundar Tinggi K.02 40.00 bh 85,000 3,400,000 6 Kursi Kerja K.05 2.00 bh 175,000 350,000 7 Lemari Kaca Geser L.02 1.00 bh 650,000 650,000 8 Lemari Alat Peraga L.06 1.00 bh 750,000 750,000 9 Lemari Besi L.08 2.00 bh 500,000 1,000,000

10 Lemari Kertas Kerja L.10 1.00 bh 1,100,000 1,100,000 11 Lemari Gantung / PPPK L.14 1.00 bh 300,000 300,000 12 Lemari Asam L.20 1.00 bh 700,000 700,000 13 Papan Tulis Gantung P.01 1.00 bh 350,000 350,000 14 Kotak Sampah KS 2.00 bh 50,000 100,000

Jumlah 13,990,000 VI LABORATORIUM BAHASA1 Meja Guru M.07 3.00 bh 325,000 975,000 2 Meja Baca Kelompok M.04 6.00 bh 275,000 1,650,000 3 Kursi Putar K.07 28.00 bh 325,000 9,100,000 4 Lemari Kaca Geser L.02 1.00 bh 650,000 650,000 5 Lemari Besi L.08 2.00 bh 500,000 1,000,000 6 Lemari Kaca Tinggi L.13 5.00 bh 775,000 3,875,000 7 White Boad Gantung P.04 1.00 bh 350,000 350,000

Jumlah 17,600,000 VII RUANG KESENIAN, KETRAMPILAN1 Meja Serbaguna M.05 20.00 bh 200,000 4,000,000 2 Meja Guru M.07 1.00 bh 325,000 325,000 3 Meja Demonstrasi M.11 1.00 bh 400,000 400,000 4 Kursi Bundar K.02 41.00 bh 85,000 3,485,000 5 Kursi Kerja K.05 1.00 bh 200,000 200,000 6 Lemari Simpan L.03 1.00 bh 800,000 800,000 7 Lemari Alat Peraga L.06 1.00 bh 750,000 750,000 8 Lemari Alat L.08 2.00 bh 500,000 1,000,000 9 Lemari Kertas Kerja L.10 1.00 bh 1,100,000 1,100,000

10 Lemari Gantung / PPPK L.14 1.00 bh 300,000 300,000 11 Lemari Loker L.16 1.00 bh 900,000 900,000 12 Papan Tulis Gantung P.01 1.00 bh 350,000 350,000 13 Kotak Sampah KS 2.00 bh 50,000 100,000

Page 31: Rab RKB MI 2013wf

Jumlah 13,710,000

Page 32: Rab RKB MI 2013wf

NO. URAIAN PEKERJAAN KODE JUMLAHHARGA JUMLAHSATUAN HARGA

(Rp.) (Rp.)VIII MESS GURU1 Meja Kerja M.08 1.00 bh 275,000 275,000 2 Kursi Siswa K.01 2.00 bh 120,000 240,000 3 Lemari Pakaian Guru L.17 10.00 bh 550,000 5,500,000 4 Dipan Tidur Tunggal U.07 6.00 bh 650,000 3,900,000 5 Dipan Tidur Ganda U.08 2.00 bh 1,250,000 2,500,000 6 Kotak Sampah KS 2.00 bh 50,000 100,000

Jumlah 12,515,000 IX KANTIN, KOPERASI, GUDANG1 Meja Serbaguna M.05 3.00 bh 200,000 600,000 2 Meja Guru M.07 3.00 bh 325,000 975,000 3 Kursi Siswa K.01 1.00 bh 120,000 120,000 4 Kursi Kerja K.05 3.00 bh 175,000 525,000 5 Kursi Bundar K.03 12.00 bh 75,000 900,000 6 Lemari Buku L.01 2.00 bh 800,000 1,600,000 7 Lemari Alat Peraga L.06 1.00 bh 750,000 750,000 8 Rak Buku R.02 2.00 bh 800,000 1,600,000 9 Rak Gudang R.04 1.00 bh 775,000 775,000

10 Kotak Sampah KS 2.00 bh 50,000 100,000

Jumlah 7,945,000 Jumlah Total 153,405,000

Konsultan Construction ManagementKonsultan Lapangan PT. PRAMATHANA

Pengadaan Furniture USBSLTPN 5 Plampang

(Ir. I Dewa Made Alit Karyawan, MT)Ir. I Wayan Toyadi Bagiartha Team Leader

Pemimpin Proyek Perluasan dan Peningkatan Mutu SLTP Jakarta

Page 33: Rab RKB MI 2013wf

RENCANA ANGARAN BIAYA

PEKERJAAN : Pengadaan Furniture USB

LOKASI PEKERJAAN : Jl. Arwah SombeDESA/ KECAMATAN : Gelanggang / Sakra TimurKABUPATEN : Lombok TimurTAHUN ANGGARAN : 2005PROPINSI : Nusa Tenggara Barat

RENCANA ANGGARAN BIAYA (RAB)

NO. URAIAN PEKERJAAN KODE JUMLAHHARGA JUMLAHSATUAN HARGA

(Rp.) (Rp.)

I RUANG TEORI (3 Ruang )1 Meja Siswa Tunggal M.01 120.00 bh 135,000 16,200,000 2 Meja Guru M.07 3.00 bh 325,000 975,000 3 Kursi Siswa K.01 120.00 bh 120,000 14,400,000 4 Kursi Guru K.05 3.00 bh 175,000 525,000 5 Papan Tulis Gantung P.01 3.00 bh 350,000 1,050,000 6 Papan Absen P.10 3.00 bh 200,000 600,000 7 Kotak Sampah KS 3.00 bh 50,000 150,000

Jumlah 33,900,000

II RUANG PERPUSTAKAAN DAN MEDIA ( 1 UNIT )1 Meja Baca Individu M.03 6.00 bh 295,000 1,770,000 2 Meja Baca Kelompok M.04 6.00 bh 275,000 1,650,000 3 Meja Guru M.07 1.00 bh 325,000 325,000 4 Meja Sirkulasi M.10 2.00 bh 350,000 700,000 5 Meja Ketik M.12 1.00 bh 175,000 175,000 6 Kursi Siswa K.01 51.00 bh 120,000 6,120,000 7 Kursi Kerja K.05 2.00 bh 175,000 350,000 8 Lemari Buku L.01 3.00 bh 800,000 2,400,000 9 Lemari Katalog L.11 1.00 bh 750,000 750,000

10 Lemari Kardek L.12 1.00 bh 475,000 475,000 11 Rak Tas/Barang R.01 3.00 bh 1,050,000 3,150,000 12 Rak Buku Satu Muka R.02 2.00 bh 800,000 1,600,000 13 Rak Buku Dua Muka R.03 1.00 bh 1,150,000 1,150,000 14 Rak Gudang R.04 1.00 bh 775,000 775,000 15 Rak Majalah R.06 1.00 bh 725,000 725,000 16 Rak Atlas R.07 1.00 bh 450,000 450,000 17 Rak Ensiklopedi R.08 1.00 bh 275,000 275,000 18 Rak Koran R.09 1.00 bh 300,000 300,000 19 Rak Dorong R.10 2.00 bh 325,000 650,000 20 White Boad Gantung P.04 1.00 bh 350,000 350,000 21 Papan Pameran P.08 1.00 bh 700,000 700,000 22 Kotak Sampah KS 1.00 bh 50,000 50,000

Jumlah 24,890,000

III RUANG KANTOR ( 1 UNIT )RUANG KEPALA SEKOLAH, TATA USAHA DAN GURU

1 Meja Kerja Pimpinan M.06 1.00 bh 550,000 550,000 2 Meja Guru M.07 13.00 bh 325,000 4,225,000 3 Meja Tamu M.13 2.00 bh 325,000 650,000 3 Lemari Buku L.01 1.00 bh 800,000 800,000 4 Lemari Kaca Geser L.02 1.00 bh 650,000 650,000 5 Lemari Kunci L,15 1.00 bh 350,000 350,000 6 Lemari Loker L.16 1.00 bh 900,000 900,000 7 Kursi Hadap K.01 4.00 bh 120,000 480,000 8 Kursi Kerja Pimpinan K.04 1.00 bh 850,000 850,000 9 Kursi Kerja K.05 13.00 bh 175,000 2,275,000

10 Kursi Lipat K.06 4.00 bh 175,000 700,000 11 Kursi Tamu K.08 8.00 bh 175,000 1,400,000

Page 34: Rab RKB MI 2013wf

12 Papan Tulis Gantung P.01 1.00 bh 350,000 350,000 13 White Boad Gantung P.04 1.00 bh 350,000 350,000

Page 35: Rab RKB MI 2013wf

NO. URAIAN PEKERJAAN KODE JUMLAHHARGA JUMLAHSATUAN HARGA

(Rp.) (Rp.)14 Papan Statistik P.06 2.00 bh 300,000 600,000 15 Papan Jadwal P.07 1.00 bh 300,000 300,000 16 Papan Pameran P.08 2.00 bh 700,000 1,400,000 17 Tungku Tiang Bendera U.04 1.00 bh 225,000 225,000 18 Kotak Sampah KS 3.00 bh 50,000 150,000

Jumlah 17,205,000 IV. RUANG BK, UKS, OSIS DAN PRAMUKA1 Meja Serbaguna M.05 6.00 bh 200,000 1,200,000 2 Meja Guru M.07 3.00 bh 325,000 975,000 3 Meja Tamu M.13 2.00 bh 325,000 650,000 4 Kursi Siswa K.01 15.00 bh 120,000 1,800,000 5 Kursi Kerja K.05 3.00 bh 175,000 525,000 6 Kursi Tamu K.08 4.00 bh 175,000 700,000 7 Lemari Buku L.01 1.00 bh 800,000 800,000 8 Lemari Kaca Geser L.02 1.00 bh 650,000 650,000 9 Lemari Pembatas L.04 1.00 bh 750,000 750,000

10 Lemari Obat L.07 1.00 bh 650,000 650,000 11 White Boad Gantung P.04 1.00 bh 350,000 350,000 12 Papan Jadwal P.07 1.00 bh 300,000 300,000 13 Papan Piket P.09 1.00 bh 200,000 200,000 14 Filling Cabinet U.01 1.00 bh 1,000,000 1,000,000 15 Tungku Tiang Bendera U.04 1.00 bh 225,000 225,000 16 Dipan Periksa U.06 1.00 bh 875,000 875,000

.

Jumlah 11,650,000 V LABORATORIUM SAINS, TI DAN K1 Meja Serbaguna M.05 19.00 bh 200,000 3,800,000 2 Meja Guru M.07 2.00 bh 325,000 650,000 3 Meja Demonstrasi M.11 1.00 bh 400,000 400,000 4 Kursi Siswa K.01 1.00 bh 120,000 120,000 5 Kursi Bundar Tinggi K.02 40.00 bh 85,000 3,400,000 6 Kursi Kerja K.05 2.00 bh 175,000 350,000 7 Lemari Kaca Geser L.02 1.00 bh 650,000 650,000 8 Lemari Alat Peraga L.06 1.00 bh 750,000 750,000 9 Lemari Besi L.08 2.00 bh 500,000 1,000,000

10 Lemari Kertas Kerja L.10 1.00 bh 1,100,000 1,100,000 11 Lemari Gantung / PPPK L.14 1.00 bh 340,000 340,000 12 Lemari Asam L.20 1.00 bh 700,000 700,000 13 Papan Tulis Gantung P.01 1.00 bh 350,000 350,000 14 Kotak Sampah KS 2.00 bh 50,000 100,000

Jumlah 13,710,000 VI LABORATORIUM BAHASA1 Meja Guru M.07 bh 325,000 - 2 Meja Baca Kelompok M.04 bh 275,000 - 3 Kursi Putar K.07 bh 325,000 - 4 Lemari Kaca Geser L.02 bh 650,000 - 5 Lemari Besi L.08 bh 500,000 - 6 Lemari Kaca Tinggi L.13 bh 775,000 - 7 White Boad Gantung P.04 bh 350,000 -

Jumlah - VII RUANG KESENIAN, KETRAMPILAN1 Meja Serbaguna M.05 20.00 bh 200,000 2 Meja Guru M.07 1.00 bh 325,000 3 Meja Demonstrasi M.11 1.00 bh 400,000 4 Kursi Bundar K.02 41.00 bh 85,000 5 Kursi Kerja K.05 1.00 bh 200,000 6 Lemari Simpan L.03 1.00 bh 800,000 7 Lemari Alat Peraga L.06 1.00 bh 750,000 8 Lemari Alat L.08 2.00 bh 500,000 9 Lemari Kertas Kerja L.10 1.00 bh 1,100,000

10 Lemari Gantung / PPPK L.14 1.00 bh 300,000 11 Lemari Loker L.16 1.00 bh 900,000 12 Papan Tulis Gantung P.01 1.00 bh 350,000 13 Kotak Sampah KS 2.00 bh 50,000

Page 36: Rab RKB MI 2013wf

Jumlah -

Page 37: Rab RKB MI 2013wf

NO. URAIAN PEKERJAAN KODE JUMLAHHARGA JUMLAHSATUAN HARGA

(Rp.) (Rp.)VIII MESS GURU1 Meja Kerja M.08 bh 275,000 - 2 Kursi Siswa K.01 bh 120,000 - 3 Lemari Pakaian Guru L.17 bh 550,000 - 4 Dipan Tidur Tunggal U.07 bh 650,000 - 5 Dipan Tidur Ganda U.08 bh 1,250,000 - 6 Kotak Sampah KS bh 50,000 -

Jumlah - IX KANTIN, KOPERASI, GUDANG1 Meja Serbaguna M.05 3.00 bh 200,000 600,000 2 Meja Guru M.07 3.00 bh 325,000 975,000 3 Kursi Siswa K.01 1.00 bh 120,000 120,000 4 Kursi Kerja K.05 3.00 bh 175,000 525,000 5 Kursi Bundar K.03 12.00 bh 75,000 900,000 6 Lemari Buku L.01 2.00 bh 800,000 1,600,000 7 Lemari Alat Peraga L.06 1.00 bh 750,000 750,000 8 Rak Buku R.02 2.00 bh 800,000 1,600,000 9 Rak Gudang R.04 1.00 bh 775,000 775,000

10 Kotak Sampah KS 2.00 bh 50,000 100,000

Jumlah 7,945,000 Jumlah Total 109,300,000

Sumbawa 8 Agustus 2005Konsultan Lapangan Komite Pembangunan USB

Pengadaan Furniture USB SMPN 3 AlasSLTPN 5 Plampang

( Puji Yagus Purnomo )Ir. I Wayan Toyadi Bagiartha Ketua Komite

Pemimpin Proyek Perluasan dan Peningkatan Mutu SLTP Jakarta

Page 38: Rab RKB MI 2013wf

REKAPITULASI BIAYA PEMBANGUNAN USB : : Jl. Arwah Sombe

NO JENIS PEKERJAAN R. TEORI R. ADMINISTRASI PERPUSTAKAAN R. PENJAGA KM/WC SISWA GDG, KANTIN,KOP MUSHOLLA PARKIR SISWA Lab sains Lab Bahasa Kesenian/ketramp. Mess Guru Rumah Dinas kepala sekolah RUANG BK,OSIS PRAMUKA JUMLAH

NX 1X 1X 1X 1X 1X 1x 1x 1x 1x 1x 1X

PEKERJAAN PERSIAPAN 10,000,000

A PEKERJAAN TANAH DAN PASIR 4,063,087 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

B PEKERJAAN PONDASI DAN BETON 79,885,610 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

C PEKERJAAN LANTAI 17,476,242 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

D PEKERJAAN DINDING 10,373,750 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

E PEKERJAAN KAYU 40,609,882 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

F PEKERJAAN PLESTERAN 7,793,191 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

G PEKERJAAN ATAP/PLAFOND 24,857,628 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

H PEKERJAAN BESI/ BAJA 1,909,500 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

I PEKERJAAN PENGECATAN 10,923,630 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

J PEKERJAAN INSTALASI LISTRIK 2,442,000 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

K PEKERJAAN INST. AIR+SANITAIR #REF! #REF! #REF! #REF! #REF! #REF!

L PEKERJAAN LAIN-LAIN 3,362,469 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

BANGUNAN SELASAR PENGHUBUNG #REF!

PEMBUATAN TIANG BENDERA #REF!

PEMBUATAN PAPAN NAMA SEKOLAH #REF!

PEMBUATAN PAGAR KELILING #REF!

PEMBUATAN PAGAR DEPAN #REF!

PEMBUATAN MAIN ENTERANCE #REF!

PEK. PRASARANA LINGKUNGAN #REF!

MENARA AIR KONST. BAJA #REF!

FURNITURE #REF!

JUMLAH 203,696,989 #REF! #REF! #REF! #REF! #REF! #REF! #REF! - - #REF! - - #REF! #REF!

Page 39: Rab RKB MI 2013wf

BOBOT

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

Page 40: Rab RKB MI 2013wf

DEPARTEMEN PENDIDIKAN NASIONALDIREKTORAT JENDERAL PENDIDIKAN DASAR DAN MENENGAHDIREKTORAT PENDIDIKAN DASAR DAN MENENGAH

RENCANA ANGARAN BIAYA

LOKASI : Jl. Arwah SombeKABUPATEN : Lombok Timur

TIME SCHEDULENO URAIAN PEKERJAAN NILAI BOBOT DURASI PROGRES BULAN I BULAN II BULAN III BULAN IV BULAN V PEMELIHARAAN

PEKERJAAN (Minggu) (Per/mg) 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 TIGA BULAN

1 PEKERJAAN PERSIAPAN 10,000,000 #REF! 18.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

2 PEMBANGUNAN GEDUNG

A PEKERJAAN TANAH DAN PASIR #REF! #REF! 5.00 #REF! #REF! #REF! #REF! #REF! #REF!

B PEKERJAAN PONDASI DAN BETON #REF! #REF! 7.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

C PEKERJAAN LANTAI #REF! #REF! 4.00 #REF! #REF! #REF! #REF! #REF!

D PEKERJAAN DINDING #REF! #REF! 6.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF!

E PEKERJAAN KAYU #REF! #REF! 10.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

F PEKERJAAN PLESTERAN #REF! #REF! 4.00 #REF! #REF! #REF! #REF! #REF!

G PEKERJAAN ATAP/PLAFOND #REF! #REF! 4.00 #REF! #REF! #REF! #REF! #REF!

H PEKERJAAN BESI/ BAJA #REF! #REF! 4.00 #REF! #REF! #REF! #REF! #REF!

I PEKERJAAN PENGECATAN #REF! #REF! 3.00 #REF! #REF! #REF! #REF!

J PEKERJAAN INSTALASI LISTRIK #REF! #REF! 4.00 #REF! #REF! #REF! #REF! #REF!

K PEKERJAAN INST. AIR+SANITAIR #REF! #REF! 3.00 #REF! #REF! #REF! #REF!

L PEKERJAAN LAIN-LAIN #REF! #REF! 8.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

3 BANGUNAN SELASAR PENGHUBUNG #REF! #REF! 4.00 #REF! #REF! #REF! #REF! #REF!

4 PEMBUATAN TIANG BENDERA #REF! #REF! 3.00 #REF! #REF! #REF! #REF!

5 PEMBUATAN PAGAR KELILING #REF! #REF! 6.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF!

6 PEMBUATAN PAGAR DEPAN #REF! #REF! 4.00 #REF! #REF! #REF! #REF! #REF!

7 PEMBUATAN MAIN ENTERANCE #REF! #REF! 2.00 #REF! #REF! #REF!

8 PEMBUATAN PAPAN NAMA SEKOLAH #REF! #REF! 3.00 #REF! #REF! #REF! #REF!

9 PEK. PRASARANA LINGKUNGAN #REF! #REF! 11.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

10 MENARA AIR KONST. BAJA #REF! #REF! 2.00 #REF! #REF! #REF!

11 FURNITURE #REF! #REF! 14.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

JUMLAH #REF! #REF!RENCANA MINGGU INI #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

RENCANA KOMULATIF MINGGU INI #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

REALISASI MINGGU INIREALISASI KOMULATIF MINGGU INI

Kuripan, 8 Agustus 2005Komite Pembangunan USB

( Puji yagus Purnomo )

Ketua Komite

Rencana

Page 41: Rab RKB MI 2013wf

RENCANA ANGARAN BIAYA

PEKERJAAN : Pembangunan Unit Sekolah Baru SLTP Negeri

Dengan Mekanisme Partisipasi MasyarakatLOKASI PEKERJAAN : Unit Sekolah Baru SMP Negeri 2 BuerDESA/ KECAMATAN : Jurumapin / BuerKABUPATEN : SumbawaTAHUN ANGGARAN : 2005PROPINSI : Nusa Tenggara Barat

``

No. U r a i a n J u m l a h S a t u a nHarga Satuan Jumlah Harga

(Rp.) (Rp.)

A HONORARIUM KP-USB DANKEPALA PELAKSANA

1 Ketua Komite 5.00 bulan 1,000,000 5,000,000 2 Sekretaris 5.00 bulan 650,000 3,250,000 3 Administrasi Keuangan 5.00 bulan 650,000 3,250,000 4 Bendahara 5.00 bulan 650,000 3,250,000 5 Kepala Pelaksana 5.00 bulan 1,000,000 5,000,000

B KOORDINASI1 Rapat Forum Komunikasi/ bulan

bersama KP-USB- Transportasi 25 org x 5 tahap org/tahap 24,500 3,062,500 - Konsumsi 25 org x 5 tahap org/tahap 12,500 1,562,500

2 Rapat KP-USB (rapat intern)- Transportasi 8 org x 20 tahap org/tahap 15,000 2,400,000 - Konsumsi 8 org x 20 tahap org/tahap 10,000 1,600,000

C PERIJINAN- Pengurusan IMB 1.00 ls 1,500,000 1,500,000 - Asuransi tenaga kerja 1.00 ls 1,000,000 1,000,000

D PENYUSUNAN PROPOSAL- Penyusunan Proposal & Dok. SPPB (sewa computer, foto copy, dll.) 1.00 ls 1,150,000 1,150,000 - Pengajuan Termyn I s/d V 5.00 tahapan 75,000 375,000

E PEMBELIAN MEUBELER- Meja 1/2 biro 2.00 unit 175,000 350,000 - Kursi kerja 2.00 unit 25,000 50,000 - Kursi rapat 5.00 unit 25,000 125,000 - Meja rapat 1.00 unit 100,000 100,000 - Filling kabinet plastik 1.00 unit 150,000 150,000 - Rak buku Plastik 1.00 unit 100,000 100,000 - Kursi dan meja tamu bahan bambu 1.00 unit 250,000 250,000

Page 42: Rab RKB MI 2013wf

No. U r a i a n J u m l a h S a t u a nHarga Satuan Jumlah Harga

(Rp.) (Rp.)

F BIAYA ATK + PENDUKUNG- Kertas A4 (70) gram 4.00 rim 25,000 100,000 - Kertas A4 (60) gram 2.00 rim 20,000 40,000 - Alat tulis kantor 5.00 bulan 50,000 250,000 - Kertas kop komite 1.00 rim 75,000 75,000 - Stempel 1.00 buah 30,000 30,000 - Kertas karbon 1.00 rim 30,000 30,000 - Buku administrasi 2.00 lusin 75,000 150,000 - White board 1.00 buah 150,000 150,000 - Papan pengumuman 3.00 buah 150,000 450,000

G PELAPORAN- Laporan Harian 750.00 exemplar 150 112,500 - Laporan Mingguan 120.00 exemplar 3,000 360,000 - Laporan Bulanan 30.00 exemplar 10,000 300,000 - Laporan Akhir Proyek 10.00 exemplar 10,000 100,000 - Laporan Dokumentasi 4.00 roll 70,000 280,000 - Dokumentasi Video 1.00 LS 200,000 200,000

H LAIN-LAIN- Pembayaran rekening listrik 5.00 bulan 25,000 125,000 - Komunikasi/ surat menyurat 5.00 bulan 65,000 325,000 - Air minum (kopi, teh, dll.) 5.00 bulan 50,000 250,000 - Transportasi pengurusan, survey harga, pembelian material, dll. 5.00 bulan 80,000 400,000 - Pembelian kotak P3K 1.00 paket 100,000 100,000 - Pengukuran ulang 1.00 Ls 200,000 200,000 - As Build Drawing 1.00 Ls 1,000,000 1,000,000

T O T A L K E S E L U R U H A N 38,552,500

TERBILANG : TIGA PULUH SEMBILAN JUTA DUA RATUS SEMBILAN PULUH DUA RIBU

EMPAT RATUS DUA PULUH LIMA RUPIAH