DAFTAR HARGA BAHANPEKERJAAN PEMBANGUNAN RUANG KELAS BARU (RKB) SMP NEGERI 40 MAKASSAR TAHUN ANGGARAN 2010

NO1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51

JENIS BAHANSemen PC Semen warna Kawat Beton Kawat Bronjong Kawat Duri Besi Beton Polos Besi Beton Ulir Paku 11/2 cm s/d 21/2 cm Paku 4 cm s/d 10 cm Paku 2 cm s/d 3 cm Paku Tripleks Paku Seng Paku Beton Teakwood 3 mm Tripleks 3 mm Tripleks 4 mm Tripleks 6 mm Multipleks 9 mm Multipleks 12 mm Batu Merah Buis Beton Paving blok Main Truss (C85.0,68) Reng U Type 41.33 Screw 12-14 X 20 Screw 10-16 X 16 Baut Dinabolt Spandek Screw Nok Spandek Besi Hollow Sekrup Besi Begel Gypsum 9 mm Seng Gelombang BJLS 0.20 Angkur Seng Plat Keramik 30 X 30 DN Putih Keramik 20 X 20 DN Putih Cat Kayu / Besi Rool Cat Tembok Meni Kayu / Besi Plamir Tembok Plamir Kayu Residu Minyak Cat Dempul Kayu Amplas Cat Dasar Kuas Cat Cat Tembok Setara Metrolite

SPESIFIKASIZak

SAT.50 Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Dos Lbr Lbr Lbr Lbr Lbr Lbr Bh m1 m2 m1 m Bh Bh Bh m2 Bh m1 Btg Bh Bh Lbr Lbr Bh Lbr Dos Dos Kg Lbr Kg Kg Kg Kg Liter Kg Lbr Kg Bh Kg1

HARGARp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 46,250 65,000 10,000 17,500 15,500 7,500 8,000 15,000 17,000 17,000 17,000 35,000 15,000 65,000 80,000 92,000 100,000 150,000 200,000 500 50,000 37,700 11,000 10,000 1,000 1,000 5,500 45,000 100 25,000 15,000 500 12,000 75,000 42,000 12,000 65,000 36,500 35,000 58,000 12,500 34,000 28,500 30,000 43,000 7,500 20,000 4,000 37,500 8,000 25,000

Uk. 122 X 244 cm Uk. 122 X 244 cm Uk. 122 X 244 cm Uk. 122 X 244 cm Uk. 122 X 244 cm Uk. 122 X 244 cm Uk. 10 X 21 X5 1/2/ dia .20 K 250

10 Kaki

Kw - 1 Kw - 1 Ex Mowilex

52 53 54 55 56 57 58 59

vernis Kaca Rayban Kaca Polos 5 mm Kaca Bening Bahan Kimia Anti Rayap Lem Kayu Kunci Pintu 1 Slaag Kunci Pintu 2 Slaag

Klg m2 m2

Rp Rp Rp Rp Rp Rp Rp Rp

34,000 95,000 90,000 85,000 85,000 15,000 60,000 50,000

m2 Ltr Kg Bh Bh

DAFTAR HARGA BAHANPEKERJAAN PEMBANGUNAN RUANG KELAS BARU (RKB) SMP NEGERI 40 MAKASSAR TAHUN ANGGARAN 2010

NO60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 B 1 2 3 4 5 6 7 8 9 10 11 12 13 14

JENIS BAHANGrendel Jendella Grendel Pintu Kait Angin Engsel Jendela Engsel Pintu Lis Profil 5 cm M C B B Box M C B 4A Grendel Pintu Titik Lampu Titik Stop Kontak Fitting Skalar Ganda Skalar Tunggal Stop Kontak Lampu TL 20 Watt lengkap Philips Lampu 25 Watt (Phiilips) Kabel Listrik Alat Bantu Steger Work Genteng Metal Surya Roof Nok Genteng Metal Surya Roof BAHAN DASAR Batu Gunung Batu Kali Batu Belah 3 - 5 cm Batu Belah 2 - 3 cm Batu Belah 1 - 2 cm Batu Belah 0.5 - 1 cm (split) Sirtu Pasir Urug/Tanah Timbunan Timbunan Biasa/Tanah Urug Pasir Kasar/ Pasir Beton Pasir Pasangan Balok Kayu Kelas III Papan Kayu Kelas III Balok Kayu Kelas I

SPESIFIKASI

SAT.Bh Bh Bh Psg Psg 1 m Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh m1 Btg Ls Lbr Lbr Bh m3 m m m m m m m m m3 3

HARGARp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 9,000 20,000 18,000 15,000 10,000 15,000 7,500 38,650 36,300 10,000 15,000 6,100 17,600 12,500 19,750 60,000 65,000 8,800 30,000 49,382 30,000 25,000 100,000 100,000 175,000 195,000 200,000 225,000 95,000 45,000 40,000 95,000 95,000 1,100,000 1,000,000 4,500,000

m33 3

m33 3 3

m33 3

15 16 17 C 1 2 3 4 5 6 7

Balok Kayu Kelas II Papan Kayu Kelas II Dolken Kayu Galam 8 - 10/4 m BAHAN DASAR Meja Murid Ganda Kursi Murid Meja Guru Lemari Kelas Papan Tulis Papan Absen Kotak Sampah

m3 m Btg Bh Bh Bh Bh Bh Bh Bh3

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

1,500,000 1,750,000 50,000 500,000 261,150 362,200 1,937,300 350,000 75,000 150,000

Makassar, 29 September 2010 Penawar,

CV. KARYA ENAM ENAM

Ir. KHAERAN IDRISDirektur

DAFTAR UPAH KERJAPEKERJAAN PEMBANGUNAN RUANG KELAS BARU (RKB) SMP NEGERI 40 MAKASSAR TAHUN ANGGARAN 2010

NO1 2 3 4 5 6 7 8 9 10 11 12

TENAGA KERJAMandor Kepala Tukang Batu Kepala Tukang Kayu Kepala Tukang Besi Kepala Tukang Listrik Kepala Tukang Cat Tukang Batu Tukang Kayu Tukang Besi Tukang Listrik Tukang Cat Pekerja

KODEMAN KTUK KTUK KTUK KTUK KTUK TUK TUK TUK TUK TUK PR Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

UPAH (Rp. / Hari)60,000 50,000 60,000 55,000 55,000 45,000 45,000 55,000 50,000 45,000 40,000 40,000

Makassar, 29 September 2010 Penawar,

CV. KARYA ENAM ENAM

Ir. KHAERAN IDRISDirektur

ANALISA HARGA SATUANPEKERJAAN LOKASI KEGIATAN SUMBER DANA TAHUN ANGGARAN NO KODE ANALISA : PEMBANGUNAN RUANG KELAS BARU : SMP NEGERI 40 MAKASSAR : DINAS PENDIDIKAN KOTA MAKASSAR : DEBT SWAP : 2010 INDEKS SAT. m2 Oh Oh URAIAN HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

1 Bahan 0.6000 0.0300

1

Mengangkut dan Pembuangan Tanah Pekerja Mandor @ Rp @ Rp 40,000.00 60,000.00 JUMLAH Rp Rp Rp 24,000.00 1,800.00 25,800.00

2 Bahan 0.33000 Upah Kerja 0.0300 0.0500 0.0050 0.0015

1

m2 Ltr

Pekerjaan Anti Rayap Bahan Kimia Anti Rayap @ Rp 85,000.00 Jumlah Bahan @ @ @ @ Rp 40,000.00 Rp 45,000.00 Rp 50,000.00 Rp 60,000.00 Jumlah Upah Kerja JUMLAH Rp Rp Rp Rp Rp Rp Rp Rp 28,050.00 28,050.00 1,200.00 2,250.00 250.00 90.00 3,790.00 31,840.00

Oh Oh Oh Oh

Pekerja Tukang Batu Kepala Tukang Batu Mandor

3 Bahan 0.0120 0.0200 0.0070 Upah Kerja 0.1000 0.1000 0.0100 0.0050

1

m2 m3 Kg m3

Pengukuran dan Pemasangan Bouwplank Balok Kayu Kelas II Paku 4 cm s/d 10 cm Papan Kayu Kelas II @ Rp 1,500,000.00 @ Rp 17,000.00 @ Rp 1,750,000.00 Jumlah Bahan @ @ @ @ Rp 40,000.00 Rp 45,000.00 Rp 50,000.00 Rp 60,000.00 Jumlah Upah Kerja JUMLAH Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 18,000.00 340.00 12,250.00 30,590.00 4,000.00 4,500.00 500.00 300.00 9,300.00 39,890.00

Oh Oh Oh Oh

Pekerja Tukang Batu Kepala Tukang Batu Mandor

4 Tenaga 0.4000 0.0400

1

m3 Oh Oh

Galian Tanah Biasa Pekerja Mandor @ Rp @ Rp 40,000.00 60,000.00 JUMLAH Rp Rp Rp 16,000.00 2,400.00 18,400.00

5 Tenaga 0.1920 0.0190

1

m3 Oh Oh

Urungan / Timbunan Kembali Pekerja Mandor @ Rp @ Rp 40,000.00 60,000.00 JUMLAH Rp Rp Rp 7,680.00 1,140.00 8,820.00

6 Bahan 1.2000 Upah Kerja 0.3000 0.0100

1

m3 m3

Urungan Pasir Urug Pasir Urug/Tanah Timbunan @ Rp 45,000.00 Jumlah Bahan @ Rp 40,000.00 @ Rp 60,000.00 Jumlah Upah Kerja JUMLAH Rp Rp Rp Rp Rp Rp 54,000.00 54,000.00 12,000.00 600.00 12,600.00 66,600.00

Oh Oh

Pekerja Mandor

7 Bahan 1.1000 2.5000 0.4000 Upah Kerja 1.5000 0.6000 0.0600 0.0750

1

m3 1 Zak m3

Pasangan Pondasi Batu Gunung 1 : 5 Batu Gunung Semen PC Pasir Pasangan @ Rp 100,000.00 @ Rp 46,250.00 @ Rp 95,000.00 Jumlah Bahan @ @ @ @ Rp 40,000.00 Rp 45,000.00 Rp 50,000.00 Rp 60,000.00 Jumlah Upah Kerja JUMLAH Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 110,000.00 115,625.00 38,000.00 263,625.00 60,000.00 27,000.00 3,000.00 4,500.00 94,500.00 358,125.00

Oh Oh Oh Oh

Pekerja Tukang Batu Kepala Tukang Batu Mandor

8 Bahan 1.2000 0.3000 Upah Kerja 0.7800 0.3900 0.0390 0.0390

1

M

3

Pasangan Batu Kosong Batu Gunung Pasir Pasangan @ Rp 100,000.00 @ Rp 95,000.00 Jumlah Bahan @ @ @ @ Rp 40,000.00 Rp 45,000.00 Rp 50,000.00 Rp 60,000.00 Jumlah Upah Kerja JUMLAH Rp Rp Rp Rp Rp Rp Rp Rp Rp 120,000.00 28,500.00 148,500.00 31,200.00 17,550.00 1,950.00 2,340.00 53,040.00 201,540.00

m 3 m

3

Oh Oh Oh Oh

Pekerja Tukang Batu Kepala Tukang Batu Mandor

NO

KODE ANALISA

INDEKS

SAT. m3 Zak m3 m3

URAIAN

HARGA SATUAN (Rp.)

JUMLAH HARGA (Rp.)

9 Bahan 6.4000 0.5400 0.8300 Upah Kerja 2.5000 0.7500 0.1000 0.1250

1

Rabat Beton Semen PC Pasir Pasangan Batu Belah 2 - 3 cm @ Rp 46,250.00 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 296,000.00 51,300.00 161,850.00 509,150.00 100,000.00 33,750.00 5,000.00 7,500.00 146,250.00 655,400.00

@ Rp 95,000.00 @ Rp 195,000.00 Jumlah Bahan @ @ @ @ Rp 40,000.00 Rp 45,000.00 Rp 50,000.00 Rp 60,000.00 Jumlah Upah Kerja JUMLAH

Oh Oh Oh Oh

Pekerja Tukang Batu Kepala Tukang Batu Mandor

10 Bahan 6.4000 0.5400 0.8300 Upah Kerja 2.5000 0.7500 0.1000 0.1250

1

m

3

Cor Beton Site MIX. K. 175 Semen PC Pasir Pasangan Batu Belah 2 - 3 cm @ Rp 46,250.00 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 296,000.00 51,300.00 161,850.00 509,150.00 100,000.00 33,750.00 5,000.00 7,500.00 146,250.00 509,150.00

Zak m3 m3

@ Rp 95,000.00 @ Rp 195,000.00 Jumlah Bahan @ @ @ @ Rp 40,000.00 Rp 45,000.00 Rp 50,000.00 Rp 60,000.00 Jumlah Upah Kerja JUMLAH

Oh Oh Oh Oh

Pekerja Tukang Batu Kepala Tukang Batu Mandor

11 Bahan 1.5000 0.0100 Upah Kerja 0.0020 0.0150 0.0100 0.0023

1

Kg Kg Kg

Besi Beton Terpasang U. 24 Besi Beton Polos Kawat Beton @ Rp 7,500.00 @ Rp 10,000.00 Jumlah Bahan @ @ @ @ Rp 40,000.00 Rp 45,000.00 Rp 50,000.00 Rp 60,000.00 Jumlah Upah Kerja JUMLAH Rp Rp Rp Rp Rp Rp Rp Rp Rp 11,250.00 100.00 11,350.00 80.00 675.00 500.00 138.00 1,393.00 12,743.00

Oh Oh Oh Oh

Pekerja Tukang Batu Kepala Tukang Batu Mandor

12 Bahan 0.0200 0.4000 Upah Kerja 0.1000 0.1500 0.0150 0.0050

1

m2 m Kg3

Bekesting Dengan Kayu Meranti Papan Kayu Kelas III Paku 4 cm s/d 10 cm @ Rp 1,000,000.00 @ Rp 17,000.00 Jumlah Bahan @ @ @ @ Rp 40,000.00 Rp 55,000.00 Rp 60,000.00 Rp 60,000.00 Jumlah Upah Kerja JUMLAH Rp Rp Rp Rp Rp Rp Rp Rp Rp 20,000.00 6,800.00 26,800.00 4,000.00 8,250.00 900.00 300.00 13,450.00 40,250.00

Oh Oh Oh Oh

Pekerja Tukang Kayu Kepala Tukang Kayu Mandor

13 Bahan 70.0000 0.2000

1

m2 Bh Zak

Pasangan Dinding Batu Merah 1 : 5 Batu Merah Semen PC @ Rp @ Rp 500.00 46,250.00 Rp Rp 35,000.00 9,250.00

0.0400 Upah Kerja 0.3200 0.1000 0.0100 0.0150

m3

Pasir Pasangan

@ Rp 95,000.00 Jumlah Bahan @ @ @ @ Rp 40,000.00 Rp 45,000.00 Rp 50,000.00 Rp 60,000.00 Jumlah Upah Kerja JUMLAH

Rp Rp Rp Rp Rp Rp Rp Rp

3,800.00 48,050.00 12,800.00 4,500.00 500.00 900.00 18,700.00 66,750.00

Oh Oh Oh Oh

Pekerja Tukang Batu Kepala Tukang Batu Mandor

14 Bahan 0.0864 0.0220 Upah Kerja 0.2000 0.1500 0.0150 0.0100

1

m2 Zak 3 m

Plesteran Dinding 1 : 5 Semen PC Pasir Pasangan @ Rp 46,250.00 @ Rp 95,000.00 Jumlah Bahan @ @ @ @ Rp 40,000.00 Rp 45,000.00 Rp 50,000.00 Rp 60,000.00 Jumlah Upah Kerja JUMLAH Rp Rp Rp Rp Rp Rp Rp Rp Rp 3,996.00 2,090.00 6,086.00 8,000.00 6,750.00 750.00 600.00 16,100.00 22,186.00

Oh Oh Oh Oh

Pekerja Tukang Batu Kepala Tukang Batu Mandor

NO

KODE ANALISA

INDEKS

SAT. m2 Bh Zak 3 m

URAIAN

HARGA SATUAN (Rp.)

JUMLAH HARGA (Rp.)

15 Bahan 70.0000 0.3000 0.0600 Upah Kerja 0.3200 0.1000 0.0100 0.0150

1

PAS. Ornamen Tiang dgn Bata 1:5 diplester Batu Merah Semen PC Pasir Pasangan @ Rp 500.00 @ Rp 46,250.00 @ Rp 95,000.00 Jumlah Bahan @ @ @ @ Rp 40,000.00 Rp 45,000.00 Rp 50,000.00 Rp 60,000.00 Jumlah Upah Kerja JUMLAH Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 35,000.00 13,875.00 5,700.00 48,875.00 12,800.00 4,500.00 500.00 900.00 18,700.00 67,575.00

Oh Oh Oh Oh

Pekerja Tukang Batu Kepala Tukang Batu Mandor

16 Bahan 0.2000 0.1000 0.0100 1.0000 0.5000 Upah Kerja 0.2000 0.0630 0.0063 0.0063

1

m2 Kg Kg Bh Ls Lbr

Pengecetan Dinding dan Plafond ( 3X ) Cat Tembok Setara Metrolite Plamir Tembok Rool Cat Tembok Steger Work Amplas @ @ @ @ @ Rp 25,000.00 Rp 28,500.00 Rp 12,500.00 Rp 49,382.00 Rp 4,000.00 Jumlah Bahan Rp 40,000.00 Rp 40,000.00 Rp 45,000.00 Rp 60,000.00 Jumlah Upah Kerja JUMLAH Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 5,000.00 2,850.00 125.00 49,382.00 2,000.00 59,357.00 8,000.00 2,520.00 283.50 378.00 11,181.50 70,538.50

Oh Oh Oh Oh

Pekerja Tukang Cat Kepala Tukang Cat Mandor

@ @ @ @

17 Bahan 1.0000 0.1400 0.0250 0.0130 Upah Kerja 0.6200 0.3600 0.3500 0.0300

1

m2 m2 Zak m3 Kg

Lantai Keramik 30 / 30 DN Putih Keramik 30 X 30 DN Putih Semen PC Pasir Pasangan Semen warna @ Rp @ Rp 36,500.00 46,250.00 Rp Rp Rp Rp Rp Rp Rp Rp Rp 36,500.00 6,475.00 2,375.00 845.00 46,195.00 24,800.00 16,200.00 17,500.00 1,800.00

@ Rp 95,000.00 @ Rp 65,000.00 Jumlah Bahan @ @ @ @ Rp Rp Rp Rp 40,000.00 45,000.00 50,000.00 60,000.00

Oh Oh Oh Oh

Pekerja Tukang Batu Kepala Tukang Batu Mandor

Jumlah Upah Kerja JUMLAH 18 Bahan 1.0000 0.1400 0.0250 0.0130 Upah Kerja 0.6200 0.3600 0.3500 0.0300 m Zak m3 Kg2

Rp Rp

60,300.00 106,495.00

1

m

2

Lantai Keramik Putih 20 / 20 DN Putih Keramik 20 X 20 DN Putih Semen PC Pasir Pasangan Semen warna @ Rp @ Rp 35,000.00 46,250.00 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 35,000.00 6,475.00 2,375.00 845.00 44,695.00 24,800.00 16,200.00 17,500.00 1,800.00 60,300.00 104,995.00

@ Rp 95,000.00 @ Rp 65,000.00 Jumlah Bahan @ @ @ @ Rp 40,000.00 Rp 45,000.00 Rp 50,000.00 Rp 60,000.00 Jumlah Upah Kerja JUMLAH

Oh Oh Oh Oh

Pekerja Tukang Batu Kepala Tukang Batu Mandor

19 Bahan 0.3200 0.1000 0.1450 Upah Kerja 0.4500 0.4500 0.0450 0.0225

1

Bh m3 Zak m3

Pondasi Umpak Kolom Batu Gunung Semen PC Pasir Pasangan @ Rp 100,000.00 @ Rp 46,250.00 @ Rp 95,000.00 Jumlah Bahan @ @ @ @ Rp 40,000.00 Rp 45,000.00 Rp 50,000.00 Rp 60,000.00 Jumlah Upah Kerja JUMLAH Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 32,000.00 4,625.00 13,775.00 50,400.00 18,000.00 20,250.00 2,250.00 1,350.00 41,850.00 92,250.00

Oh Oh Oh Oh

Pekerja Tukang Batu Kepala Tukang Batu Mandor

20 Bahan 1.1000 10.0000 4.5000 3.0000 Upah Kerja 4.0000 12.0000 1.2000 0.2000

1

m3 m Kg Kg Kg3

Kuda - Kuda Kayu Kelas I Balok Kayu Kelas I Besi Begel Paku 4 cm s/d 10 cm Residu @ @ @ @ Rp 4,500,000.00 Rp 12,000.00 Rp 17,000.00 Rp 43,000.00 Jumlah Bahan Rp 40,000.00 Rp 55,000.00 Rp 60,000.00 Rp 60,000.00 Jumlah Upah Kerja JUMLAH Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 4,950,000.00 120,000.00 76,500.00 129,000.00 5,275,500.00 160,000.00 660,000.00 72,000.00 12,000.00 904,000.00 6,179,500.00

Oh Oh Oh Oh

Pekerja Tukang Kayu Kepala Tukang Kayu Mandor

@ @ @ @

NO

KODE ANALISA

INDEKS

SAT. m2 m3 Kg Kg

URAIAN

HARGA SATUAN (Rp.)

JUMLAH HARGA (Rp.)

21 Bahan 0.0125 0.2500 0.5000 Upah Kerja 0.0500 0.1500 0.0150 0.0250

1

Gording Kayu Kelas I Balok Kayu Kelas I Paku 4 cm s/d 10 cm Residu @ Rp 4,500,000.00 @ Rp 17,000.00 @ Rp 43,000.00 Jumlah Bahan @ @ @ @ Rp 40,000.00 Rp 55,000.00 Rp 60,000.00 Rp 60,000.00 Jumlah Upah Kerja JUMLAH Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 56,250.00 4,250.00 21,500.00 82,000.00 2,000.00 8,250.00 900.00 1,500.00 12,650.00 94,650.00

Oh Oh Oh Oh

Pekerja Tukang Kayu Kepala Tukang Kayu Mandor

22 Bahan 1.6000 Upah Kerja 0.0800 0.0500 0.0050 0.0040

1

m2 Lbr

Penutup Atap Genteng Metal Surya Roof @ Rp 30,000.00 Jumlah Bahan @ @ @ @ Rp 40,000.00 Rp 55,000.00 Rp 60,000.00 Rp 60,000.00 Jumlah Upah Kerja JUMLAH Rp Rp Rp Rp Rp Rp Rp Rp 48,000.00 48,000.00 3,200.00 2,750.00 300.00 240.00 6,490.00 54,490.00

Oh Oh Oh Oh

Pekerja Tukang Kayu Kepala Tukang Kayu Mandor

23 Bahan 1.2500 0.0100 Upah Kerja 0.1000 0.0100 0.0010 0.0050

1

m

1

PEK. Nok / Bubungan Nok Genteng Metal Surya Roof Papan Kayu Kelas II @ Rp 25,000.00 @ Rp 1,750,000.00 Jumlah Bahan @ @ @ @ Rp 40,000.00 Rp 55,000.00 Rp 60,000.00 Rp 60,000.00 Jumlah Upah Kerja JUMLAH Rp Rp Rp Rp Rp Rp Rp Rp Rp 31,250.00 17,500.00 48,750.00 4,000.00 550.00 60.00 300.00 4,910.00 53,660.00

Lbr m3

Oh Oh Oh Oh

Pekerja Tukang Kayu Kepala Tukang Kayu Mandor

24 Bahan 0.0100 0.0100 Upah Kerja 0.0690 0.1250 0.0130 0.0030

1

m

1

PEK. Lisplank Kayu Kelas I Papan Kayu Kelas II Paku 4 cm s/d 10 cm @ Rp 1,750,000.00 @ Rp 17,000.00 Jumlah Bahan @ @ @ @ Rp 40,000.00 Rp 55,000.00 Rp 60,000.00 Rp 60,000.00 Jumlah Upah Kerja JUMLAH Rp Rp Rp Rp Rp Rp Rp Rp Rp 17,500.00 170.00 17,670.00 2,760.00 6,875.00 780.00 180.00 10,595.00 28,265.00

m3 Kg

Oh Oh Oh Oh

Pekerja Tukang Kayu Kepala Tukang Kayu Mandor

25 Bahan 1.1000 4.5000 10.0000 8.0000 Upah Kerja 3.0000 5.0000 0.5000 0.1500

1

m3 m3 Kg Kg Kg

PEK. Konsul Kayu Kelas I Balok Kayu Kelas I Paku 4 cm s/d 10 cm Besi Begel Residu @ @ @ @ Rp 4,500,000.00 Rp 17,000.00 Rp 12,000.00 Rp 43,000.00 Jumlah Bahan Rp 40,000.00 Rp 55,000.00 Rp 60,000.00 Rp 60,000.00 Jumlah Upah Kerja JUMLAH Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 4,950,000.00 76,500.00 120,000.00 344,000.00 5,490,500.00 120,000.00 275,000.00 30,000.00 9,000.00 434,000.00 5,924,500.00

Oh Oh Oh Oh

Pekerja Tukang Kayu Kepala Tukang Kayu Mandor

@ @ @ @

26 Bahan 0.1700 0.0890 0.2200 0.4000 0.1500 0.0500 Upah Kerja 0.0750 0.1500 0.1500 0.0040

1

m3 Kg Kg Kg Lbr Ltr Bh

Pengecatan Kayu 3X Berikut Mani Meni Kayu / Besi Plamir Kayu Cat Kayu / Besi Amplas Minyak Cat Kuas Cat @ @ @ @ @ @ Rp 34,000.00 Rp 30,000.00 Rp 58,000.00 Rp 4,000.00 Rp 7,500.00 Rp 8,000.00 Jumlah Bahan Rp 40,000.00 Rp 40,000.00 Rp 45,000.00 Rp 60,000.00 Jumlah Upah Kerja JUMLAH Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 5,780.00 2,670.00 12,760.00 1,600.00 1,125.00 400.00 24,335.00 3,000.00 6,000.00 6,750.00 240.00 15,990.00 40,325.00

Oh Oh Oh Oh

Pekerja Tukang Cat Kepala Tukang Cat Mandor

@ @ @ @

NO

KODE ANALISA

INDEKS

SAT. m2 m3 Kg

URAIAN

HARGA SATUAN (Rp.)

JUMLAH HARGA (Rp.)

27 Bahan 0.0100 0.0200 Upah Kerja 0.0800 0.1600 0.0160 0.0040

1

PAS. Rangka Plafond Balok Kayu Kelas II Paku 4 cm s/d 10 cm @ Rp 1,500,000.00 @ Rp 17,000.00 Jumlah Bahan @ @ @ @ Rp Rp Rp Rp 40,000.00 55,000.00 60,000.00 60,000.00 Rp Rp Rp Rp Rp Rp Rp 15,000.00 340.00 15,340.00 3,200.00 8,800.00 960.00 240.00

Oh Oh Oh Oh

Pekerja Tukang Kayu Kepala Tukang Kayu Mandor

Jumlah Upah Kerja JUMLAH 28 Bahan 0.5000 0.0100 Upah Kerja 0.0500 0.0800 0.0080 0.0030 1 m2

Rp Rp

13,200.00 28,540.00

Plafond Tripleks Tripleks 4 mm Paku 2 cm s/d 3 cm @ Rp 92,000.00 @ Rp 17,000.00 Jumlah Bahan @ @ @ @ Rp 40,000.00 Rp 55,000.00 Rp 60,000.00 Rp 60,000.00 Jumlah Upah Kerja JUMLAH Rp Rp Rp Rp Rp Rp Rp Rp Rp 46,000.00 170.00 46,170.00 2,000.00 4,400.00 480.00 180.00 7,060.00 53,230.00

Lbr Kg

Oh Oh Oh Oh

Pekerja Tukang Kayu Kepala Tukang Kayu Mandor

29 Bahan 3.000 5.000 9.000 11.000 0.600 Upah Kerja 0.650 0.080 0.060 0.006

1

m2 m1 m PC PC PC1

PAS. Rangka Atap Baja Ringan Main Truss (C85.0,68) Reng U Type 41.33 Screw 12-14 X 20 Screw 10-16 X 16 Baut Dinabolt @ Rp @ @ @ @ 11,000.00 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 33,000.00 50,000.00 900.00 1,100.00 3,300.00 88,300.00 26,000.00 4,000.00 3,300.00 360.00 33,660.00 121,960.00

Rp 10,000.00 Rp 100.00 Rp 100.00 Rp 5,500.00 Jumlah Bahan Rp 40,000.00 Rp 50,000.00 Rp 55,000.00 Rp 60,000.00 Jumlah Upah Kerja JUMLAH

Oh Oh Oh Oh

Pekerja Tukang Besi Kepala Tukang Besi Mandor

@ @ @ @

30 Bahan 1.100 8.000 Upah Kerja 0.060 0.006 0.120 0.006

1

m2 Lbr PC

PAS. Atap Metal Spandek Screw @ Rp 45,000.00 @ Rp 100.00 Jumlah Bahan @ @ @ @ Rp 40,000.00 Rp 50,000.00 Rp 55,000.00 Rp 60,000.00 Jumlah Upah Kerja JUMLAH Rp Rp Rp Rp Rp Rp Rp Rp Rp 49,500.00 800.00 50,300.00 2,400.00 300.00 6,600.00 360.00 9,660.00 59,960.00

Oh Oh Oh Oh

Pekerja Tukang Besi Kepala Tukang Besi Mandor

31 Bahan 1.100 10.000 Upah Kerja 0.075 0.008 0.150 0.006

1

m2 Lbr PC

PAS. Nok Metal Nok Spandek Screw @ Rp 25,000.00 @ Rp 1,000.00 Jumlah Bahan @ @ @ @ Rp 40,000.00 Rp 50,000.00 Rp 55,000.00 Rp 60,000.00 Jumlah Upah Kerja JUMLAH Rp Rp Rp Rp Rp Rp Rp Rp Rp 27,500.00 10,000.00 37,500.00 3,000.00 400.00 8,250.00 360.00 12,010.00 49,510.00

Oh Oh Oh Oh

Pekerja Tukang Besi Kepala Tukang Besi Mandor

32 Bahan 0.700 12.000 Upah Kerja 0.060 0.006 0.120 0.006

1

m2 Lbr PC

PAS. Atap Seng BJLS Seng Gelombang BJLS 0.20 Screw @ Rp 42,000.00 @ Rp 100.00 Jumlah Bahan @ @ @ @ Rp 40,000.00 Rp 50,000.00 Rp 55,000.00 Rp 60,000.00 Jumlah Upah Kerja JUMLAH Rp Rp Rp Rp Rp Rp Rp Rp Rp 29,400.00 1,200.00 30,600.00 2,400.00 300.00 6,600.00 360.00 9,660.00 40,260.00

Oh Oh Oh Oh

Pekerja Tukang Besi Kepala Tukang Besi Mandor

NO 33

KODE ANALISA

INDEKS 1 Bahan 0.300 10.000 Upah Kerja 0.075 0.003 0.150 0.006

SAT. m1

URAIAN PAS. Nok Seng Seng Plat Screw

HARGA SATUAN (Rp.)

JUMLAH HARGA (Rp.)

Lbr PC

@ Rp 65,000.00 @ Rp 100.00 Jumlah Bahan @ @ @ @ Rp 40,000.00 Rp 50,000.00 Rp 55,000.00 Rp 60,000.00 Jumlah Upah Kerja JUMLAH

Rp Rp Rp Rp Rp Rp Rp Rp Rp

19,500.00 1,000.00 20,500.00 3,000.00 150.00 8,250.00 360.00 11,760.00 32,260.00

Oh Oh Oh Oh

Pekerja Tukang Besi Kepala Tukang Besi Mandor

34 Bahan 4.600 0.200 0.390 Upah Kerja 0.500 0.050 0.150 0.008

1

m2 Bh Kg Lbr

PAS. Rangka Hollow + Gypsum 9 mm Besi Hollow Sekrup Gypsum 9 mm @ Rp 15,000.00 @ Rp 500.00 @ Rp 75,000.00 Jumlah Bahan @ @ @ @ Rp 40,000.00 Rp 50,000.00 Rp 55,000.00 Rp 60,000.00 Jumlah Upah Kerja JUMLAH Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 69,000.00 100.00 29,250.00 98,350.00 20,000.00 2,500.00 8,250.00 480.00 31,230.00 129,580.00

Oh Oh Oh Oh

Pekerja Tukang Besi Kepala Tukang Besi Mandor

35 Bahan 4.600 0.200 0.390 Upah Kerja 0.500 0.050 0.150 0.008

1

m2 Bh Kg Lbr

PAS. Rangka Hollow + Tripleks 3 mm Besi Hollow Sekrup Tripleks 3 mm @ Rp 15,000.00 @ Rp 500.00 @ Rp 80,000.00 Jumlah Bahan @ @ @ @ Rp 40,000.00 Rp 50,000.00 Rp 55,000.00 Rp 60,000.00 Jumlah Upah Kerja JUMLAH Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 69,000.00 100.00 31,200.00 100,300.00 20,000.00 2,500.00 8,250.00 480.00 31,230.00 131,530.00

Oh Oh Oh Oh

Pekerja Tukang Besi Kepala Tukang Besi Mandor

36 Bahan 0.009 0.060 Upah Kerja 0.100 0.010 0.100 0.050

1

m1 Lbr Kg

PAS. Lisplank 2X (2X20) cm, Kayu Kls II Papan Kayu Kelas II Paku 4 cm s/d 10 cm @ Rp 1,750,000.00 @ Rp 17,000.00 Jumlah Bahan @ @ @ @ Rp 40,000.00 Rp 55,000.00 Rp 60,000.00 Rp 60,000.00 Jumlah Upah Kerja JUMLAH Rp Rp Rp Rp Rp Rp Rp Rp Rp 15,750.00 1,020.00 16,770.00 4,000.00 550.00 6,000.00 3,000.00 13,550.00 30,320.00

Oh Oh Oh Oh

Pekerja Tukang Kayu Kepala Tukang Kayu Mandor

37 Bahan 0.1420 0.0230 4.0000 4.0000 2.4150 0.1000 6.0000 2.0000 Upah Kerja 2.5000 3.5000 0.3500 0.1250

1

Unit m3 m3 PC Bh m2 Bh Bh Bh

Kusen Type J - 1 Kayu Kelas I Balok Kayu Kelas I Papan Kayu Kelas II Engsel Jendela Kait Angin Kaca Polos 5 mm Paku 4 cm s/d 10 cm Angkur Grendel Jendella @ Rp @ Rp @ Rp @ Rp @ @ @ @ 4,500,000.00 1,750,000.00 15,000.00 18,000.00 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 639,000.00 40,250.00 60,000.00 72,000.00 217,350.00 1,700.00 72,000.00 40,000.00 1,142,300.00 100,000.00 192,500.00 21,000.00 7,500.00 321,000.00 1,463,300.00

Rp 90,000.00 Rp 17,000.00 Rp 12,000.00 Rp 20,000.00 Jumlah Bahan Rp 40,000.00 Rp 55,000.00 Rp 60,000.00 Rp 60,000.00 Jumlah Upah Kerja JUMLAH

Oh Oh Oh Oh

Pekerja Tukang Kayu Kepala Tukang Kayu Mandor

@ @ @ @

38 Bahan 0.1300

1

Unit m3

Kusen Type J - 2 Kayu Kelas I Balok Kayu Kelas I @ Rp 4,500,000.00 Rp 585,000.00

0.0050 4.0000 4.0000 0.8400 0.8000 4.0000 8.0000 Upah Kerja 2.2500 3.0000 0.3000 0.1130

m PC Bh 2 m Bh Bh Bh

3

Papan Kayu Kelas II Engsel Jendela Kait Angin Kaca Polos 5 mm Paku 4 cm s/d 10 cm Angkur Grendel Jendella

@ Rp @ Rp @ Rp @ @ @ @

1,750,000.00 15,000.00 18,000.00

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

8,750.00 60,000.00 72,000.00 75,600.00 13,600.00 48,000.00 72,000.00 934,950.00 90,000.00 165,000.00 18,000.00 6,780.00 279,780.00 1,214,730.00

Rp 90,000.00 Rp 17,000.00 Rp 12,000.00 Rp 9,000.00 Jumlah Bahan Rp 40,000.00 Rp 55,000.00 Rp 60,000.00 Rp 60,000.00 Jumlah Upah Kerja JUMLAH

Oh Oh Oh Oh

Pekerja Tukang Kayu Kepala Tukang Kayu Mandor

@ @ @ @

NO 39

KODE ANALISA

INDEKS 1 Bahan 0.0900 3.3600 6.0000 1.0000 0.1250 6.0000 2.0000 Upah Kerja 3.2500 4.5000 0.4500 0.1630

SAT. Unit m3 m3 PC Bh Kg Bh Bh

URAIAN Kusen Type P - 1 Kayu Kelas I Balok Kayu Kelas I Papan Kayu Kelas II Engsel Jendela Kunci Pintu 2 Slaag Paku 4 cm s/d 10 cm Angkur Grendel Pintu

HARGA SATUAN (Rp.)

JUMLAH HARGA (Rp.)

@ Rp @ @ @ @ @ @

4,500,000.00

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

405,000.00 5,880,000.00 90,000.00 50,000.00 2,125.00 72,000.00 40,000.00 6,539,125.00 130,000.00 247,500.00 27,000.00 9,780.00 414,280.00 6,953,405.00

Rp 1,750,000.00 Rp 15,000.00 Rp 50,000.00 Rp 17,000.00 Rp 12,000.00 Rp 20,000.00 Jumlah Bahan Rp 40,000.00 Rp 55,000.00 Rp 60,000.00 Rp 60,000.00 Jumlah Upah Kerja JUMLAH

Oh Oh Oh Oh

Pekerja Tukang Kayu Kepala Tukang Kayu Mandor

@ @ @ @

40 Bahan 0.0650 1.6800 3.0000 1.0000 0.1000 6.0000 2.0000 Upah Kerja 1.2500 2.2500 0.2250 0.6300

1

Unit m3

Kusen Type P - 2 Kayu Kelas I Balok Kayu Kelas I Papan Kayu Kelas II Engsel Jendela Kunci Pintu 2 Slaag Paku 4 cm s/d 10 cm Angkur Grendel Pintu @ Rp @ @ @ @ @ @ 4,500,000.00 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 292,500.00 2,940,000.00 45,000.00 50,000.00 1,700.00 120,000.00 40,000.00 3,489,200.00 50,000.00 123,750.00 13,500.00 37,800.00 225,050.00 3,714,250.00

m3 PC Bh Kg Bh Bh

Rp 1,750,000.00 Rp 15,000.00 Rp 50,000.00 Rp 17,000.00 Rp 20,000.00 Rp 20,000.00 Jumlah Bahan Rp 40,000.00 Rp 55,000.00 Rp 60,000.00 Rp 60,000.00 Jumlah Upah Kerja JUMLAH

Oh Oh Oh Oh

Pekerja Tukang Kayu Kepala Tukang Kayu Mandor

@ @ @ @

41 Bahan 1.0000 0.1400 0.0250 2.0000 Upah Kerja 0.1500 0.1000 0.0100 0.0080

1

Unit m3 m3 Kg Bh

Kusen BV Kayu Kelas I Balok Kayu Kelas I Papan Kayu Kelas II Paku 4 cm s/d 10 cm Angkur @ Rp 4,500,000.00 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 4,500,000.00 245,000.00 425.00 24,000.00 4,769,425.00 6,000.00 5,500.00 600.00 480.00 12,580.00 4,782,005.00

@ Rp 1,750,000.00 @ Rp 17,000.00 @ Rp 12,000.00 Jumlah Bahan @ @ @ @ Rp 40,000.00 Rp 55,000.00 Rp 60,000.00 Rp 60,000.00 Jumlah Upah Kerja JUMLAH

Oh Oh Oh Oh

Pekerja Tukang Kayu Kepala Tukang Kayu Mandor

42 Bahan 0.2400 0.0060 0.1600 0.1000

1

Unit m3 m3 m2 Kg

Kusen VA Kayu Kelas I Balok Kayu Kelas I Papan Kayu Kelas II Kaca Polos 5 mm Paku 4 cm s/d 10 cm @ Rp @ Rp @ Rp @ Rp 4,500,000.00 1,750,000.00 90,000.00 17,000.00 Rp Rp Rp Rp 1,080,000.00 10,500.00 14,400.00 1,700.00

4.0000 Upah Kerja 1.7500 2.7500 0.2750 0.0880

Bh

Angkur

@ Rp 12,000.00 Jumlah Bahan @ @ @ @ Rp 40,000.00 Rp 55,000.00 Rp 60,000.00 Rp 60,000.00 Jumlah Upah Kerja JUMLAH

Rp Rp Rp Rp Rp Rp Rp Rp

48,000.00 1,154,600.00 70,000.00 151,250.00 16,500.00 5,280.00 243,030.00 1,397,630.00

Oh Oh Oh Oh

Pekerja Tukang Kayu Kepala Tukang Kayu Mandor

43 Bahan 1.0500 0.2000 0.0500 Upah Kerja 0.1200 0.2500 0.0150 0.0100

1

Unit Bh Zak m3

PAS. Saluran Pinggir Bangunan Buis Beton Semen PC Pasir Pasangan @ Rp 50,000.00 @ Rp 46,250.00 @ Rp 95,000.00 Jumlah Bahan @ @ @ @ Rp 40,000.00 Rp 45,000.00 Rp 50,000.00 Rp 60,000.00 Jumlah Upah Kerja JUMLAH Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 52,500.00 9,250.00 4,750.00 66,500.00 4,800.00 11,250.00 750.00 600.00 17,400.00 83,900.00

Oh Oh Oh Oh

Pekerja Tukang Batu Kepala Tukang Batu Mandor

44 Upah Kerja 0.0720 0.0120

1

m

2

Pekerjaan Perataan Tanah Pekerja Tukang Batu @ Rp 40,000.00 @ Rp 45,000.00 Jumlah Bahan JUMLAH Rp Rp Rp Rp 2,880.00 540.00 3,420.00 3,420.00

Oh Oh

NO 45

KODE ANALISA

INDEKS 1 Bahan 0.0308 0.0300 Upah Kerja 0.7500 0.5000

SAT. Unit m3 Kg Bouvenlich Type 2 Papan Kayu Kelas II Paku Seng

URAIAN

HARGA SATUAN (Rp.)

JUMLAH HARGA (Rp.)

@ Rp 1,750,000.00 @ Rp 35,000.00 Jumlah Bahan @ Rp 40,000.00 @ Rp 55,000.00 Jumlah Upah Kerja JUMLAH

Rp Rp Rp Rp Rp Rp Rp

53,900.00 1,050.00 54,950.00 30,000.00 27,500.00 57,500.00 112,450.00

Oh Oh

Pekerja Tukang Kayu

46 Bahan 1.1000 6.0000 Upah Kerja 0.2500 0.1500

1

m1 m %1

PAS. Pipa 1 /2 Pipa dia 1 /2 Perlengkapan 35 % @ Rp 8,500.00 @ Rp 3,272.50 Jumlah Bahan @ Rp 40,000.00 @ Rp 45,000.00 Jumlah Upah Kerja JUMLAH Rp Rp Rp Rp Rp Rp Rp 9,350.00 196.35 9,546.35 10,000.00 6,750.00 16,750.00 26,296.35

Oh Oh

Pekerja Tukang Batu

47 Bahan 0.0736 0.0500 6.0000 0.7000

1

Unit m3 Kg Bh Ls

Angin - Angin Kelas I Balok Kayu Kelas I Paku 4 cm s/d 10 cm Angkur Alat Bantu @ Rp 4,500,000.00 @ Rp 17,000.00 @ Rp 12,000.00 Rp 30,000.00 Jumlah Bahan Rp Rp Rp Rp Rp 331,200.00 850.00 72,000.00 21,000.00 425,050.00

Upah Kerja 0.7500 0.5000

Oh Oh

Pekerja Tukang Kayu

@ Rp 40,000.00 @ Rp 55,000.00 Jumlah Upah Kerja JUMLAH

Rp Rp Rp Rp

30,000.00 27,500.00 57,500.00 482,550.00

48 Bahan 0.0800

1

m2 Oh

Pembersihan Lokasi Pekerja @ Rp 40,000.00 Jumlah Bahan JUMLAH Rp Rp Rp 3,200.00 3,200.00 3,200.00

49 Bahan 0.0022 0.0200 Upah Kerja 0.0210 0.0210 0.0020 0.0010

1

m

3

List Plafond Balok Kayu Kelas II Paku Seng @ Rp 1,500,000.00 @ Rp 35,000.00 Jumlah Bahan @ @ @ @ Rp 40,000.00 Rp 55,000.00 Rp 60,000.00 Rp 60,000.00 Jumlah Upah Kerja JUMLAH Rp Rp Rp Rp Rp Rp Rp Rp Rp 3,300.00 700.00 4,000.00 840.00 1,155.00 120.00 60.00 2,175.00 6,175.00

m Kg

3

Oh Oh Oh Oh

Pekerja Tukang Kayu Kepala Tukang Kayu Mandor

50 Bahan 0.1200 0.1800 0.0100 0.1000 Upah Kerja 0.2800 0.4200 0.0040 0.0030

1

m2 Kg Kg Bh Lbr

Pengecetan Penutup Atap Cat Dasar Cat Kayu / Besi Kuas Cat Amplas @ Rp 37,500.00 @ Rp 34,000.00 Rp 8,000.00 @ Rp 4,000.00 Jumlah Bahan @ @ @ @ Rp 40,000.00 Rp 40,000.00 Rp 45,000.00 Rp 60,000.00 Jumlah Upah Kerja JUMLAH Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 4,500.00 6,120.00 80.00 80.00 10,780.00 11,200.00 16,800.00 180.00 180.00 28,360.00 39,140.00

Oh Oh Oh Oh

Pekerja Tukang Cat Kepala Tukang Cat Mandor

51 Bahan 0.0400 Upah Kerja 1.0000 2.5000 0.2500 0.0500

1

m2 m3

Pasang Pintu Panel Kayu Balok Kayu Kelas I @ Rp 4,500,000.00 Jumlah Bahan @ @ @ @ Rp 40,000.00 Rp 55,000.00 Rp 60,000.00 Rp 60,000.00 Jumlah Upah Kerja JUMLAH Rp Rp Rp Rp Rp Rp Rp Rp 180,000.00 180,000.00 40,000.00 137,500.00 15,000.00 3,000.00 195,500.00 375,500.00

Oh Oh Oh Oh

Pekerja Tukang Kayu Kepala Tukang Kayu Mandor

NO 52

KODE ANALISA

INDEKS 1 Bahan 0.0800 0.0644 1.5000 0.5000 2.0000 0.5000 48.0000 Upah Kerja 0.7500 0.7500 0.0400

SAT. Bh m3 m3 Lbr Kg Klg Kg Bh Rak Buku 1 Muka Papan Kayu Jati Balok Kayu Jati Tripleks 4 mm Paku Cat Vernis Lem Kayu Skrup

URAIAN

HARGA SATUAN (Rp.)

JUMLAH HARGA (Rp.)

@ @ @ @ @ @ @

Rp 4,500,000.00 Rp 4,500,000.00 Rp 92,000.00 Rp 17,000.00 Rp 34,000.00 Rp 15,000.00 Rp 500.00 Jumlah Bahan

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

360,000.00 289,800.00 138,000.00 8,500.00 68,000.00 7,500.00 24,000.00 895,800.00 41,250.00 30,000.00 1,600.00 72,850.00 968,650.00

Oh Oh Oh

Tukang Kayu Tukang Cat Pekerja

@ Rp 55,000.00 @ Rp 40,000.00 @ Rp 40,000.00 Jumlah Upah Kerja JUMLAH

53 Bahan 0.1600 0.1288 3.0000 1.0000 4.0000 1.0000 96.0000

1

Bh m3 m3 Lbr Kg Kg Kg Bh

Rak Buku 2 Muka Papan Kayu Jati Balok Kayu Jati Tripleks 4 mm Paku Cat Vernis Lem Kayu Skrup @ @ @ @ @ @ @ Rp Rp Rp Rp Rp Rp Rp 4,500,000.00 4,500,000.00 92,000.00 17,000.00 34,000.00 15,000.00 500.00 Rp Rp Rp Rp Rp Rp Rp 720,000.00 579,600.00 276,000.00 17,000.00 136,000.00 15,000.00 48,000.00

Jumlah Bahan Upah Kerja 1.5000 1.5000 0.0800 Oh Oh Oh Tukang Kayu Tukang Cat Pekerja @ Rp 55,000.00 @ Rp 40,000.00 @ Rp 40,000.00 Jumlah Upah Kerja JUMLAH

Rp Rp Rp Rp Rp Rp

1,791,600.00 82,500.00 60,000.00 3,200.00 145,700.00 1,937,300.00

54 Bahan 0.1361 0.0900 3.0000 1.0000 3.0000 1.0000 1.0000 4.0000 100.0000

1

Bh m3 3 m Lbr Kg Kg Kg Bh Bh Bh

Rak Buku 1 Muka Pakai Pintu Papan Kayu Jati Balok Kayu Jati Tripleks 4 mm Paku Cat Vernis Lem Kayu Grendel Engsel Skrup @ @ @ @ @ @ @ @ @ Rp 4,500,000.00 Rp 4,500,000.00 Rp 92,000.00 Rp 17,000.00 Rp 34,000.00 Rp 15,000.00 Rp 36,300.00 Rp 10,000.00 Rp 500.00 Jumlah Bahan Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 612,450.00 405,000.00 276,000.00 17,000.00 102,000.00 15,000.00 36,300.00 40,000.00 50,000.00 1,553,750.00

Upah Kerja 0.7500 0.7500 0.0400

Oh Oh Oh

Tukang Kayu Tukang Cat Pekerja

@ Rp 55,000.00 @ Rp 40,000.00 @ Rp 40,000.00 Jumlah Upah Kerja JUMLAH

Rp Rp Rp Rp Rp

41,250.00 30,000.00 1,600.00 72,850.00 1,626,600.00

55 Bahan 0.0252 0.0109 1.0000 0.8000 1.0000 1.0000

1

Bh m3 m3 Kg Kg Kg Kg

Meja Kerja Komputer Papan Kayu Jati Balok Kayu Jati Paku Cat Vernis Lem Kayu Skrup @ @ @ @ @ @ Rp 4,500,000.00 Rp 4,500,000.00 Rp 17,000.00 Rp 34,000.00 Rp 15,000.00 Rp 25,000.00 Jumlah Bahan Rp Rp Rp Rp Rp Rp Rp 113,400.00 49,050.00 17,000.00 27,200.00 15,000.00 25,000.00 246,650.00

Upah Kerja 0.7500 0.2000 0.0300

Oh Oh Oh

Tukang Kayu Tukang Cat Pekerja

@ Rp 55,000.00 @ Rp 40,000.00 @ Rp 40,000.00 Jumlah Upah Kerja JUMLAH

Rp Rp Rp Rp Rp

41,250.00 8,000.00 1,200.00 50,450.00 297,100.00

56 Bahan 0.0215 0.0124 1.0000 0.8000 1.0000 200.0000

1

Bh m3 m3 Kg Kg Kg Bh

Meja Kerja 1/2 Biro Papan Kayu Jati Balok Kayu Jati Paku Cat Vernis Lem Kayu Skrup @ @ @ @ @ @ Rp 4,500,000.00 Rp 4,500,000.00 Rp 17,000.00 Rp 34,000.00 Rp 15,000.00 Rp 500.00 Jumlah Bahan Rp Rp Rp Rp Rp Rp Rp 96,750.00 55,800.00 17,000.00 27,200.00 15,000.00 100,000.00 311,750.00

Upah Kerja 0.7500 0.2000 0.0300

Oh Oh Oh

Tukang Kayu Tukang Cat Pekerja

@ Rp 55,000.00 @ Rp 40,000.00 @ Rp 40,000.00 Jumlah Upah Kerja JUMLAH

Rp Rp Rp Rp Rp

41,250.00 8,000.00 1,200.00 50,450.00 362,200.00

NO 57

KODE ANALISA

INDEKS 1 Bahan 0.0190 0.0171 0.0500 0.6000 0.5000 50.0000

SAT. Bh m3 m3 Kg Kg Kg Bh Bangku Kerja Papan Kayu Jati Balok Kayu Jati Paku Cat Vernis Lem Kayu Skrup

URAIAN

HARGA SATUAN (Rp.)

JUMLAH HARGA (Rp.)

@ @ @ @ @ @

Rp 4,500,000.00 Rp 4,500,000.00 Rp 17,000.00 Rp 34,000.00 Rp 15,000.00 Rp 500.00 Jumlah Bahan

Rp Rp Rp Rp Rp Rp Rp

85,500.00 76,950.00 850.00 20,400.00 7,500.00 25,000.00 216,200.00

Upah Kerja 0.6500 0.2000 0.0300

Oh Oh Oh

Tukang Kayu Tukang Cat Pekerja

@ Rp 55,000.00 @ Rp 40,000.00 @ Rp 40,000.00 Jumlah Upah Kerja JUMLAH

Rp Rp Rp Rp Rp

35,750.00 8,000.00 1,200.00 44,950.00 261,150.00

58 Bahan 0.0020 0.0010 1.5000 0.0500 0.5000 0.1000 26.0000

1

Bh m3 m3 m3 Kg Kg Kg Bh

Meja Baca Papan Kayu Jati Balok Kayu Jati Tripleks 4 mm Paku Cat Vernis Lem Kayu Skrup @ @ @ @ @ @ @ Rp 4,500,000.00 Rp 4,500,000.00 Rp 92,000.00 Rp 17,000.00 Rp 34,000.00 Rp 15,000.00 Rp 500.00 Jumlah Bahan Rp Rp Rp Rp Rp Rp Rp Rp 9,000.00 4,500.00 138,000.00 850.00 17,000.00 1,500.00 13,000.00 183,850.00

Upah Kerja 0.1000 0.0100 0.0050

Oh Oh Oh

Tukang Kayu Tukang Cat Pekerja

@ Rp 55,000.00 @ Rp 40,000.00 @ Rp 40,000.00 Jumlah Upah Kerja JUMLAH

Rp Rp Rp Rp Rp

5,500.00 400.00 200.00 6,100.00 189,950.00

Makassar, 29 September 2010 Penawar,

CV. KARYA ENAM ENAM

Ir. KHAERAN IDRISDirektur

BILL OF QUANTITY (R.A.B)PEMBANGUNAN RUANG KELAS BARU SMP NEGERI 40 DINAS PENDIDIKAN KOTA MAKASSAR

NO I 1.1 1.2 1.3 1.4 II 2.1 2.2 2.3 2.4 III 3.1 3.2 3.3 3.4

ITEM PEKERJAAN PEK. PERSIAPAN Pengukuran dan Pemasangan Bouwplank Penyediaan P3K Dokumentasi & Pelaporan Asbulilt Drawing PEKERJAAN GALIAN & URUNGAN TANAH Galian Tanah Urungan Tanah Kembali dipadatkan Urungan Pasir dipadatkan Timbunan Tanah PEKERJAAN PONDASI & BETON Pasangan Batu Kosong Pasaangan Batu Kali Pekerjaan Anti Rayap Beton Praktis a. pondasi Poer b. Kolom Praktisi 15 / 15 c. Kolom Utama 20 / 45 d. Sloof 20 / 30 e. Ring Balk 15 / 15 f. Konsol Depan 15 / 15 g. Konsol Belakang 15 / 15 h. Sopi - sopi 12 / 15 Besi Beton Bekisting Beton Rabat Beton PEKERJAAN DINDING Dinding 1/ 2 Bata P1 Plesteran 1 : 5 & Acian Pengecetan Dinding PEKERJAAN KUSEN PINTU & JENDELA Kusen & Pintu type PJ1 Kusen & Jendela type J1 Kusen angin - angin Pengecetan / Politur Kusen, pintu & jendela PEKERJAAN ATAP Rangka Atap Baja Ringan Penutup Atap Bubungan / Nok Papan Lisplank Pengecetan lisplank & Konsul Pengecetan Penutup Atap PEKERJAAN PLAFOND Rangka Hollow

VOL 1.00 1.00 1.00 1.00

SAT Ls Ls Ls Ls Rp Rp Rp Rp

HARGA SATUAN 39,890.00 300,000.00 250,000.00 500,000.00 Sub Total I 18,400.00 66,600.00 66,600.00 66,600.00 Sub Total II 201,540.00 358,125.00 31,840.00 509,150.00 509,150.00 509,150.00 509,150.00 509,150.00 509,150.00 509,150.00 509,150.00 12,743.00 40,250.00 655,400.00 Sub Total III 22,186.00 5,546.50 70,538.50 Sub Total IV 6,953,405.00 1,463,300.00 482,550.00 70,538.50 Sub Total V 121,960.00 54,490.00 49,510.00 28,265.00 40,325.00 40,325.00 Sub Total VI 129,580.00 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

JUMLAH HARGA 39,890.00 300,000.00 250,000.00 500,000.00 1,089,890.00 1,516,896.00 2,370,960.00 419,580.00 839,160.00 5,146,596.00 2,720,790.00 8,863,593.75 4,011,840.00 549,882.00 442,960.50 1,695,469.50 1,741,293.00 651,712.00 101,830.00 101,830.00 437,869.00 16,871,732.00 5,594,750.00 1,880,998.00 45,666,549.75 5,593,534.32 2,796,767.16 35,568,333.24 43,958,634.72 13,906,810.00 5,853,200.00 3,860,400.00 4,796,618.00 28,417,028.00 20,001,440.00 8,936,360.00 1,039,710.00 1,695,900.00 737,947.50 6,613,300.00 39,024,657.50 22,806,080.00

82.44 35.60 6.30 12.60

M3 M3 M3 M3

Rp Rp Rp Rp

13.50 24.75 126.00 1.08 0.87 3.33 3.42 1.28 0.20 0.20 0.86 1324.00 139.00 2.87

M3 M3 M2 M3 M3 M3 M3 M3 M3 M3 M3 Kg M2 M3

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

3.5 3.6 3.7 IV 4.1 4.2 4.3 V 5.1 5.2 5.3 5.4 VI 6.1 6.2 6.3 6.4 6.5 6.6 VII 7.1

252.12 504.24 504.24

M2 M2 M2

Rp Rp Rp

2.00 4.00 8.00 68.00

Unit Unit Unit M2

Rp Rp Rp Rp

164.00 164.00 21.00 60.00 18.30 164.00

M3 M2 M1 M1 M2 M2

Rp Rp Rp Rp Rp Rp

176.00

M2

Rp

7.2 7.3 7.4 VIII 8.1 8.2 8.3

Plafond Tripleks 3 mm Pengecetan Plafond List Plafond PEKERJAAN LANTAI Urungan Pasir Lantai Kerja Pasangan Lantai Kramik 30 / 30

176.00 176.00 148.00

M2 M M12

Rp Rp Rp

131,530.00 40,325.00 6,175.00 Sub Total VII 66,600.00 8,820.00 106,495.00 Sub Total VIII

Rp Rp Rp Rp Rp Rp Rp Rp

23,149,280.00 7,097,200.00 913,900.00 53,966,460.00 95,904.00 1,301,832.00 15,718,662.00 17,116,398.00

1.44 147.60 147.60

M3 M M13

Rp Rp Rp

NO IX 9.1 9.2 9.3 9.4 9.5 9.6 9.7 9.8 9.9 9.10 X 10.1 10.2 XI 11.1 11.2 11.3 11.4 11.5 11.6

ITEM PEKERJAAN PEKERJAAN INSTALASI LISTRIK M C B B BOX M C B B 4A Titik Lampu Titik Stop Kontak Saklar Ganda Saklar Tunggal Stop Kontak Lampu TL 20 Watt Lengkap Philips Lampu 25 Watt (Philips) Kabel Listrik PEKERJAAN DRAINASE Saluran Keliling Bangunan Bak Kontrol PENGADAAN MOBILIER Lemari Buku Papan Tulis Meja 1/2 Biro Kursi Kerja Tiang Bendera Tempat Sampah

VOL 1.00 1.00 15.00 4.00 4.00 1.00 4.00 12.00 6.00 100.00

SAT Unit Unit Titik Titik Buah Buah Buah Unit Unit M1 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

HARGA SATUAN 7,500.00 38,650.00 10,000.00 15,000.00 17,600.00 12,500.00 19,750.00 60,000.00 65,000.00 8,800.00 Sub Total IX 83,900.00 150,000.00 Sub Total X 1,937,300.00 350,000.00 362,200.00 261,150.00 1,000,000.00 150,000.00 Sub Total X Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

JUMLAH HARGA 7,500.00 38,650.00 150,000.00 60,000.00 70,400.00 12,500.00 79,000.00 720,000.00 390,000.00 880,000.00 2,408,050.00 4,278,900.00 600,000.00 4,878,900.00 5,811,900.00 700,000.00 724,400.00 522,300.00 2,000,000.00 1,200,000.00 10,958,600.00

51 4

M Buah

Rp Rp

3 2 2 2 2 8

Unit Unit Unit Unit Unit Unit

Rp Rp Rp Rp Rp Rp

Makassar, 29 September 2010 Penawar,

CV. KARYA ENAM ENAM

Ir. KHAERAN IDRISDirektur

REKAPITULASIPEMBANGUNAN RUANG KELAS BARU SMP NEGERI 40 DINAS PENDIDIKAN KOTA MAKASSAR

NO.

ITEM PEKERJAAN

JUMLAH HARGA Rp. Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp. Rp. Rp. Rp. Rp 1,089,890.00 5,146,596.00 45,666,549.75 43,958,634.72 28,417,028.00 39,024,657.50 53,966,460.00 17,116,398.00 2,408,050.00 4,878,900.00 10,958,600.00 252,631,763.97 25,263,176.40 10,105,270.56 288,000,210.93 288,000,000.00

I. II. III. IV. V. VI. VII. VIII. IX. X. XI. (A) (B) (C) (D) (E)

PEKERJAAN PERSIAPAN PEKERJAAN GALIAN TANAH & URUGAN TANAH PEKERJAAN PONDASI & BETON PEKERJAAN DINDING PEKERJAAN KUSEN PINTU & JENDELA PEKERJAAN ATAP PEKERJAAN PLAFOND PEKERJAAN LANTAI PEKERJAAN INSTALASI LISTRIK PEKERJAAN DRAINASE PENGADAAN MOBILIER Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan ) Pajak Pertambahan Nilai ( PPN ) = 10% x (A) Izin Mendirikan Bangunan ( IMB ) = 4% x (A) Jumlah Total Harga Pekerjaan = (A) + ('B) Dibulatkan

Terbilang :

Dua Ratus Delapan Puluh Delapan Juta Rupiah,-

Makassar, 29 September 2010 Penawar,

CV. KARYA ENAM ENAM

Ir. KHAERAN IDRISDirektur

JADWAL PELAKSANAAN PEKERJAAN ( TIME SCHEDULE )PEMBANGUNAN RUANG KELAS BARU SMP NEGERI 40 DINAS PENDIDIKAN KOTA MAKASSAR

NO. I. II. III. IV. V. VI. VII. VIII. IX. X. XI. PEKERJAAN PERSIAPAN

URAIAN KEGIATAN

JUMLAH HARGA Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

(Rp)

BOBOT PEK. (%) 0.431 2.037 18.076 17.400 11.248 15.447 21.362 6.775 0.953 1.931 4.338

1 0.054 1.019

JANGKA WAKTU PELAKSANAAN 60 HARI KALENDER BULAN I BULAN II 2 3 4 5 0.054 1.019 6.025 6.025 4.350 2.250 6.025 4.350 2.250 3.862 4.350 2.250 3.862 7.121 2.258 0.238 0.238 0.054 0.054 0.054

1,089,890.00 5,146,596.00 45,666,549.75 43,958,634.72 28,417,028.00 39,024,657.50 53,966,460.00 17,116,398.00 2,408,050.00 4,878,900.00 10,958,600.00 252,631,763.97 25,263,176.40 10,105,270.56 288,000,210.93 288,000,000.00

PEKERJAAN GALIAN TANAH & URUGAN TANAH PEKERJAAN PONDASI & BETON PEKERJAAN DINDING PEKERJAAN KUSEN PINTU & JENDELA PEKERJAAN ATAP PEKERJAAN PLAFOND PEKERJAAN LANTAI PEKERJAAN INSTALASI LISTRIK PEKERJAAN DRAINASE PENGADAAN MOBILIER (A) (B) (C) (D) (E) Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan ) Pajak Pertambahan Nilai ( PPN ) = 10% x (A) Izin Mendirikan Bangunan ( IMB ) = 4% x (A) Jumlah Total Harga Pekerjaan = (A) + (B) Dibulatkan

1.084

JUMLAH NILAI PEKERJAAN RENCANA MINGGUANPROGRES RENCANA KOMULATIF

100.000 (%) (%) 1.073 1.073 7.098 8.170 12.679 20.850 16.779 37.629 21.217 58.846

PEKERJAAN ( TIME SCHEDULE )

RUANG KELAS BARU SMP NEGERI 40 ENDIDIKAN KOTA MAKASSAR

JANGKA WAKTU PELAKSANAAN 60 HARI KALENDER BULAN II 6 7 0.054 0.054

KET.8 0.054 100%

4.350 2.250 3.862 7.121 2.258 0.238 0.644 1.084 2.250 3.862 7.121 2.258 0.238 0.644 1.084 0.644 1.084 0%

21.861 80.707

17.511 98.218

1.782 100.000

(%)

Makassar, 29 September 2010 Penawar,

CV. KARYA ENAM ENAM

Ir. KHAERAN IDRISDirektur

288,000,000

DUA RATUS DELAPAN PULUH DELAPAN JUTA RUPIAH,-

DUA RATUS DELAPAN PULUH DELAPAN JUTA RUPIAH,-

DUA RATUS DELAPAN PULUH DELAPAN JUTA RUPIAH,-

A RATUS DELAPAN PULUH DELAPAN JUTA RUPIAH,-

A RATUS DELAPAN PULUH DELAPAN JUTA RUPIAH,-

0 1 2 3 4 5 6 7 8 9

SATU DUA TIGA EMPAT LIMA ENAM TUJUH DELAPAN SEMBILAN

9

3

288000000 MILYARAN JUTAAN RIBUAAN RATUSAN

2.88E+08

288 000 000 DELAPAN JUTA DELAPAN PULUH DUA RATUS

DAFTAR USULAN PEKERJAAN YANG DI SUBKONTRAKKAN BAGIAN PEKERJAAN YANG DISUBKONTRAKKANPEMBANGUNAN RUANG KELAS BARU SMP NEGERI 40 DINAS PENDIDIKAN KOTA MAKASSAR

NOMOR MATA PEMBAYARAN 1

URAIAN PEKERJAAN 2

PERSENTASE DARI HARGA TOTAL MATA PEMBAYARAN (%) 3

PERSENTASE DARI HARGA PENAWARAN (%) 4

TOTAL ( % )

Makassar, 29 September 2010 Penawar, CV. KARYA ENAM ENAM

Ir. KHAERAN IDRIS Direktur

TAR USULAN PEKERJAAN YANG DI SUBKONTRAKKAN BAGIAN PEKERJAAN YANG DISUBKONTRAKKANPEMBANGUNAN RUANG KELAS BARU SMP NEGERI 40 DINAS PENDIDIKAN KOTA MAKASSAR

NAMA SUB PENYEDIA JASA (Jika diperlukan) 5

Makassar, 29 September 2010 Penawar, CV. KARYA ENAM ENAM

Ir. KHAERAN IDRIS Direktur