lecture landscpe design
-
Upload
firman-irmansyah -
Category
Documents
-
view
215 -
download
1
description
Transcript of lecture landscpe design
MENGHITUNG MENGHITUNG KLB, KDB, KDH, KTB,PERANCANGAN TAPAK IPERANCANGAN TAPAK I08AR1‐2009/2010FIRMAN IRMANSYAH,ST 24 Oktober 2009
Pedoman Detail Teknis KetatakotaanProp.DKI Jakarta
FIRMAN IRMANSYAH,ST
Pedoman Detail Teknis KetatakotaanProp.DKI Jakarta
FIRMAN IRMANSYAH,ST
Studi kasus
FIRMAN IRMANSYAH,STPT. Airmas Asri Design Proposal Project 2009
Area CalculationCIK DITIROJakarta
Daerah Perencanaan 1,629
KDB 40% 652Daerah Perencanaan Tanpa dinding Max 5% 33
Total 684
KLB 4 6516 m2ME 15% 1149.88 m2
7665 88 m27665.88 m2
Area ME unit APT unit TH Lots Area
Roof 50 m213th 334.00 m2 50 m2 2
parkingFloor
APARTMENT & TOWN HOUSE proyeksi
12th 357.00 m2 50 m2 211th 525.50 m2 50 m2 410th 525.50 m2 50 m2 49th 525.50 m2 50 m2 48TH 639.50 m2 50 m2 67TH 639.50 m2 50 m2 66TH 639 50 m2 50 m2 66TH 639.50 m2 50 m2 65TH 639.50 m2 50 m2 64TH 698.90 m2 50 m2 63RD 698.90 m2 50 m2 62ND 543.00 m2 50 m2 6GF 273.00 m2 50 m2 16 130.70 m2SB 75 m2 23 1,016B1 140 m2 29 1,016
7,039.30 m2 775 m2 58 0 68 2,032 130.70 m2
Resume
Contruction Area 9,071.3 m2KLB Total 7,254 m2 412 3.79Parking Lots 71 LotsKDB 665 m2 40.8%
FIRMAN IRMANSYAH,ST
PT. Airmas Asri Design Proposal Project 2009