lecture landscpe design

5
MENGHITUNG MENGHITUNG KLB, KDB, KDH, KTB, PERANCANGAN TAPAK I PERANCANGAN TAPAK I 08AR12009/2010 FIRMAN IRMANSYAH,ST 24 Oktober 2009

description

saturday morning I take a class with my student

Transcript of lecture landscpe design

Page 1: lecture landscpe design

MENGHITUNG MENGHITUNG KLB, KDB, KDH, KTB,PERANCANGAN TAPAK IPERANCANGAN TAPAK  I08AR1‐2009/2010FIRMAN IRMANSYAH,ST 24 Oktober 2009

Page 2: lecture landscpe design

Pedoman Detail Teknis KetatakotaanProp.DKI Jakarta

FIRMAN IRMANSYAH,ST

Page 3: lecture landscpe design

Pedoman Detail Teknis KetatakotaanProp.DKI Jakarta

FIRMAN IRMANSYAH,ST

Page 4: lecture landscpe design

Studi kasus

FIRMAN IRMANSYAH,STPT. Airmas Asri Design Proposal Project 2009

Page 5: lecture landscpe design

Area CalculationCIK DITIROJakarta

Daerah Perencanaan 1,629

KDB 40% 652Daerah Perencanaan Tanpa dinding Max 5% 33

Total 684

KLB 4 6516 m2ME 15% 1149.88 m2

7665 88 m27665.88 m2

Area ME unit APT unit TH Lots Area

Roof 50 m213th 334.00 m2 50 m2 2

parkingFloor

APARTMENT & TOWN HOUSE proyeksi

12th 357.00 m2 50 m2 211th 525.50 m2 50 m2 410th 525.50 m2 50 m2 49th 525.50 m2 50 m2 48TH 639.50 m2 50 m2 67TH 639.50 m2 50 m2 66TH 639 50 m2 50 m2 66TH 639.50 m2 50 m2 65TH 639.50 m2 50 m2 64TH 698.90 m2 50 m2 63RD 698.90 m2 50 m2 62ND 543.00 m2 50 m2 6GF 273.00 m2 50 m2 16 130.70 m2SB 75 m2 23 1,016B1 140 m2 29 1,016

7,039.30 m2 775 m2 58 0 68 2,032 130.70 m2

Resume

Contruction Area 9,071.3 m2KLB Total 7,254 m2 412 3.79Parking Lots 71 LotsKDB 665 m2 40.8%

FIRMAN IRMANSYAH,ST

PT. Airmas Asri Design Proposal Project 2009