UNIVERSITAS ANDI DJEMMA FAKULTAS TEKNIK JURUSAN SIPIL S1 RENCANA ANGGARAN BIAYA (RAB) PEKERJAAN LOKASI No. URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA TOTAL (Rp) (Rp) (Rp) I. PEKERJAAN PENDAHULUAN 1 Pek. Pengukuran Ls 31,465.00 31,465.00 2 Papan Proyek Ls 3 Pek. Anti Rayap M2 31,465.00 II. PEKERJAAN TANAH & PASIR 1 Galian Tanah Biasa # M3 22,360.00 402,480.00 2 Timbunan Bekas Galian # M3 10,719.00 57,882.60 3 Urugan Sirtu # M3 89,575.00 3,265,008.75 4 Urugan Pasir Bawah Pondasi # M3 100,990.00 340,841.25 4,066,212.60 III. PEKERJAAN STRUKTUR 1 Sloof Beton 15/20 a. Pekerjaan Bekisting M2 113,717.00 2,046,906.00 a. Pekerjaan Besi Kg 13,213.50 1,962,997.56 b. Pekerjaan Beton M3 843,802.00 1,139,132.70 2 Kolom Beton 20/20 0.00 a. Pekerjaan Bekisting M2 101,390.00 3,244,480.00 a. Pekerjaan Besi Kg 13,213.50 1,482,730.88 b. Pekerjaan Beton M3 843,802.00 1,080,066.56 3 Kolom Teras 20/20 0.00 a. Pekerjaan Bekisting M2 101,390.00 405,560.00 b. Pekerjaan Besi Kg 13,213.50 440,097.64 c. Pekerjaan Beton M3 843,802.00 337,520.80 4 Ringbalk Beton 15/15 a. Pekerjaan Bekisting M2 b. Pekerjaan Besi Kg 13,213.50 2,717,400.32 c. Pekerjaan Beton M3 843,802.00 1,215,074.88 16,071,967.34 IV. PEKERJAAN BATU & PLESTERAN 1 Pas. Batu Kosong M3 253,369.00 1,368,192.60 2 Pas. Pondasi M3 519,715.00 5,612,922.00 3 Pas. 1/2 Batu Bata 1:5 untuk dinding M2 78,423.00 8,573,202.36 4 Plesteran Tembok 1:5 M2 27,582.00 6,030,528.48 5 M2 9,151.10 2,000,796.50 23,585,641.94 V. REHAB. LANTAI & DINDING 1 Pek. Rabat Beton M3 2 Lantai Keramik 30x30 putih M2 90,661.00 Pek. Acian Dinding (air semen tanpa kapur)

Transcript of Latihan RAB

Page 1: Latihan RAB

UNIVERSITAS ANDI DJEMMA

FAKULTAS TEKNIKJURUSAN SIPIL

S1

RENCANA ANGGARAN BIAYA (RAB)PEKERJAAN

LOKASI

No. URAIAN PEKERJAAN VOLUMEHARGA SATUAN JUMLAH HARGA TOTAL

(Rp) (Rp) (Rp)

I. PEKERJAAN PENDAHULUAN

1 Pek. Pengukuran ### Ls 31,465.00 31,465.00

2 Papan Proyek ### Ls

3 Pek. Anti Rayap ### M2

31,465.00

II. PEKERJAAN TANAH & PASIR1 Galian Tanah Biasa ###M3 22,360.00 402,480.00

2 Timbunan Bekas Galian ###M3 10,719.00 57,882.60

3 Urugan Sirtu ###M3 89,575.00 3,265,008.75

4 Urugan Pasir Bawah Pondasi ###M3 100,990.00 340,841.25

4,066,212.60

III. PEKERJAAN STRUKTUR

1 Sloof Beton 15/20

a. Pekerjaan Bekisting ### M2 113,717.00 2,046,906.00

a. Pekerjaan Besi ### Kg 13,213.50 1,962,997.56

b. Pekerjaan Beton ### M3 843,802.00 1,139,132.70

2 Kolom Beton 20/20 0.00

a. Pekerjaan Bekisting ### M2 101,390.00 3,244,480.00

a. Pekerjaan Besi ### Kg 13,213.50 1,482,730.88

b. Pekerjaan Beton ### M3 843,802.00 1,080,066.56

3 Kolom Teras 20/20 0.00

a. Pekerjaan Bekisting ### M2 101,390.00 405,560.00

b. Pekerjaan Besi ### Kg 13,213.50 440,097.64

c. Pekerjaan Beton ### M3 843,802.00 337,520.80

4 Ringbalk Beton 15/15

a. Pekerjaan Bekisting ### M2

b. Pekerjaan Besi ### Kg 13,213.50 2,717,400.32

c. Pekerjaan Beton ### M3 843,802.00 1,215,074.88

16,071,967.34

IV. PEKERJAAN BATU & PLESTERAN

1 Pas. Batu Kosong ### M3 253,369.00 1,368,192.60

2 Pas. Pondasi ### M3 519,715.00 5,612,922.00

3 Pas. 1/2 Batu Bata 1:5 untuk dinding ### M2 78,423.00 8,573,202.36

4 Plesteran Tembok 1:5 ### M2 27,582.00 6,030,528.48

5 ### M2 9,151.10 2,000,796.50

23,585,641.94

V. REHAB. LANTAI & DINDING

1 Pek. Rabat Beton ### M3

2 Lantai Keramik 30x30 putih ### M2 90,661.00

Pek. Acian Dinding (air semen tanpa kapur)

Page 2: Latihan RAB

No. URAIAN PEKERJAAN VOLUMEHARGA SATUAN

(Rp)

VI. PEKERJAAN KUSEN, JENDELA & PINTU

1 Pas. Pintu Panel ### M2 315,950.00 1,011,040.00

2 Pas. Engsel Pintu ### Psg 15,134.00 90,804.00

2 Pas. Kusen Pintu & Jendela ### M3 4,528,700.00 2,119,431.60

3 Pas. Daun Jendela Kaca ### M2 407,380.00 2,851,660.00

4 Pas. Engsel Jendela ### Psg 11,279.00 112,790.00

5 Pas. Kunci Pintu 2x Putar ### Unt 113,255.00 113,255.00

6 Pas. Grendel Kecil ### Unt

7 Pas. Grendel Besar ### Unt

6,298,980.60

VII. PEKERJAAN KAYU, ATAP & PLAFOND

1 Pek. Kuda2 Ky Klas II lokal ### M3 3,942,200.00 2,661,046.31

2 Pek. Gording Ky Klas II lokal ### M3 3,942,200.00 3,488,847.00

3 Pek. Rangka Plafond ### M2 36,475.00 4,593,223.80

4 Pek. Listplank 2X2/20 ### M1 38,990.00 2,070,369.00

5 Pek. Atap Seng Gel. Besar Bjls 0,20 ### M2 59,395.10 9,335,484.24

6 Pek. Nok Atap Seng ### M1 28,585.00 337,303.00

7 Pek. Plafond Tripleks 3mm ### M2 28,970.00 3,648,134.16

8 Pas. Lis Plafond profil 3/3 ### M1 5,847.50 684,157.50

26,818,565.01

IX. PEKERJAAN PENGECATAN

1 Pek. Cat Tembok Baru ### M2 10,396.50 2,273,090.76

2 Pek. Cat Plafond ### M2 18,109.00 2,280,430.15

3 Pek. Atap Seng ### M2 7,329.50 1,152,021.49

4 Pek. Cat Kusen, Pintu, Jendela & Listplank ### M2 15,069.50 336,113.14

6,041,655.55

Total 82,914,488.04

Page 3: Latihan RAB

Panjang Pndsi 45Galian 0.4 18Bt Kosong 0.12 5.4Pondasi 0.4 0.24 10.8Pasir Urug 0.075 3.375Luas 81

Sloef 15/20 45.00 Beton 0.030 Bekisting 0.4

Kg Besi/M Pjg Besi dia. 10 0.62 180.00 Besi dia. 6 0.22 300.00 0.56

Kolom 20x20 32.00 Beton 0.040 Bekisting 1

Kg Besi/M Pjg Besi dia. 10 0.62 128.00 Besi dia. 6 0.22 213.33 0.70

Kolom 20x20 10.00 Beton 0.040 Bekisting 0.4

Kg Besi/M Pjg Besi dia. 10 0.62 40.00 Besi dia. 6 0.22 66.67 0.58

Ringblk15/15 64.000 Beton 0.023 Bekisting 0.3

Kg Besi/M Pjg Besi dia. 10 0.62 256.00 Besi dia. 6 0.22 426.67 0.5

sopi2 14/14 11Beton 0.020 Bekisting 0.28

Kg Besi/M Pjg Besi dia. 10 0.62 44.00 Besi dia. 6 0.22 73.33 0.5

L.Kusen 1 Unit KUSEN L. KUSEN V.Kayu Kusen L.CAT2.64 5 TYPE J1 13.2 0.366 12.7680.7 2 TYPE V1 1.4 0.0492 5.7584

4.08 1 P1 4.08 0.0528 1.761 P2 0

18.68 0.468 20.2864

PAS. BATA BAGIAN ATAS P.Bangunan T.BangunanPas. Bata 32 4 128PlesteranAcian

PAS. BATA KASTING

Page 4: Latihan RAB

Pas. Bata 7 2.35 8.225PlesteranAcian

RABAT KELILING P. Rabat Lebar. mPas. Batu Bata 39.3 23.58P. Rabat 39.3 1 1.965Galian 39.3 0.045 1.7685pleseter 39.3 0.8164 32.08452

ATAP atap1157.176

NOK 11.8 11.8

Gording 6/12 KUDA-KUDA 6/12 KUDA-KUDA 8/12

0.059 14 0.1008 20.64 0.198144 0.675015550.885

PLAFOND LIST PALNK63 53.1 2.0178

20.731.608

10.62125.928

List Plafond117

Dinding 7.92 30 2.52 40.44

LIST 92.85 77.5 100.2 21.43

Page 5: Latihan RAB

1.350 18.000

111.600 36.960 148.560

1.280 32.000

79.360 32.853 112.213

0.400 4.000

24.800 8.507 33.307

1.440 19.200

158.720 46.933 205.653

0.216 3.080

27.280 8.067 35.347 274.307 2.056

Jnd. Kaca7

109.32218.64218.64

Page 6: Latihan RAB

16.4532.932.9

Nok Gording 6/12

0

291.98

Page 7: Latihan RAB

P.Pndsi = 21.00 L.Bngnan = 12.25 P.Dnding =

PEK. PONDASIGalian = 0.30 6.3Bt.Kosong = 0.09 1.89Bt. Kali = 0.18 3.78Urugan = 0.40 4.9

PEK. DINDINGPas. Bata = 35.78 4.00 4.55 39.80 Plester = 79.61

PEK. KUSEN jml luas cat volType P1 = 1.00 1.84 1.152 0.0336

Pintu = 1.00 3.20 1.60 Type J1 = 1.00 1.08 0.984 0.0287

Jendela = 1.00 0.8601 0.87Roster = 12.00

Listplank = 7.35total…………………………… 4.52 13.5461

Sloef 14/15 21.00 Beton 0.021 0.441 Bekisting 0.3 6.300

Kg Besi/M Pjg Besi dia. 10 0.62 84.00 52.080 Besi dia. 6 0.22 140.00 0.42 12.936

Kolom 15x15 26.50 Beton 0.023 - 0.596 Bekisting 0.3 7.950

Kg Besi/M Pjg Besi dia. 10 0.62 106.00 65.720 Besi dia. 6 0.22 176.67 0.42 16.324

Ringblk14/15 21Beton 0.017 0.355 Bekisting 0.3 6.300

Kg Besi/M Pjg Besi dia. 10 0.62 84.00 52.080 Besi dia. 6 0.22 140.00 0.4 12.320

Plat t : 10 2.8 2.10 4.900 Beton 0.100 0.490 Bekisting 4.900

Kg Besi/M Pjg Besi dia. 10 0.62 11.20 25.500 Besi dia. 6 0.22 18.67 0.4 19.500

Page 8: Latihan RAB

No. Dimensi Volume Panjang PANJANG TULANGAN / M3

Beton Per m' Per m3 Ø 6 Ø 8 Ø 10 Ø 12 Ø 14

SLOOF

1 Sloof 15/20 0.03 33.33 142.2 167

KOLOM

1 Kolom 25/20 0.05 20.00 90.7 120

3 Kolom 15/15 0.02 44.44 160.0 178

RINGBALK

1 Ringbalk 10/15 1.00 1.00 2.9 4

No. Ukuran (mm) Berat Kg/m Berat Kg/Batang(11 Meter)

1 Ø 5 0.15 1.652 Ø 6 0.22 2.423 Ø 7 0.30 3.304 Ø 8 0.39 4.295 Ø 9 0.59 6.496 Ø 10 0.62 6.827 Ø 11 0.75 8.258 Ø 12 0.89 9.799 Ø 13 1.04 11.4410 Ø 14 1.21 13.3111 Ø 15 1.39 15.2912 Ø 16 1.58 17.3813 Ø 17 1.78 19.5814 Ø 18 2.00 22.0015 Ø 19 2.23 24.5316 Ø 20 2.46 27.06

Page 9: Latihan RAB

BERAT TULANGAN / M3 JUMLAH

Ø 6 Ø 8 Ø 10 Ø 12 Ø 14 (KG/M3)

0.22 0.39 0.62 0.89 1.21

SLOOF

55.47 148 203.80

KOLOM

35.36 106.8 142.16

62.4 158 220.62

RINGBALK

1.144 3.56 4.70 5

110,000 16,129

78,540 8,022

Page 10: Latihan RAB

DAFTAR ANALISA HARGA SATUANBANGUNAN GEDUNG

ANALISA BIAYA KONSTRUKSI PEMBONGKARANI.A 1 M2 MEMBONGKAR DINDING TEMBOK BATU BATA

0.140 Oh Pekerja Rp 49,000.00 Rp 6,860.00 0.070 Oh Mandor Rp 69,000.00 Rp 4,830.00

Rp 11,690.00 1 M2 MENGUPAS PLESTERAN LAMA0.125 Oh Pekerja Rp 49,000.00 Rp 6,125.00 0.013 Oh Mandor Rp 69,000.00 Rp 862.50

Rp 6,987.50 1 M2 MEMBONGKAR ATAP0.008 Oh Pekerja Rp 49,000.00 Rp 392.00 0.100 Oh Tukang Kayu Rp 55,500.00 Rp 5,550.00 0.008 Oh Kepala Tukang Rp 67,000.00 Rp 502.50 0.035 Oh Mandor Rp 69,000.00 Rp 2,415.00

Rp 8,859.50 1 M2 MEMBONGKAR PLAFOND+RANGKA PLAFOND0.007 Oh Pekerja Rp 49,000.00 Rp 343.00 0.075 Oh Tukang Kayu Rp 55,500.00 Rp 4,162.50 0.008 Oh Kepala Tukang Rp 67,000.00 Rp 502.50 0.035 Oh Mandor Rp 69,000.00 Rp 2,415.00

Rp 7,423.00 1 M3 MEMBONGKAR BALOK, KAYU, KUDA-KUDA (REUSE)6.000 Oh Pekerja Rp 49,000.00 Rp 294,000.00 0.600 Oh Tukang Kayu Rp 55,500.00 Rp 33,300.00 4.000 Oh Kepala Tukang Rp 67,000.00 Rp 268,000.00 0.200 Oh Mandor Rp 69,000.00 Rp 13,800.00

Rp 609,100.00 1 M3 MEMBONGKAR BALOK, KAYU, KUDA-KUDA (NOT REUSE)1.000 Oh Pekerja Rp 49,000.00 Rp 49,000.00 0.200 Oh Mandor Rp 69,000.00 Rp 13,800.00

Rp 62,800.00 1 M2 MEMBONGKAR LANTAI / UBIN0.100 Oh Pekerja Rp 49,000.00 Rp 4,900.00 0.050 Oh Mandor Rp 69,000.00 Rp 3,450.00

Rp 8,350.00

I.B ANALISA BIAYA KONSTRUKSI PEKERJAAN PERSIAPANI1 M' Pengukuran dan Pemasangan Bouplank0.004 Kayu 5/7 Kelas III (Balok) Rp 2,200,000.00 Rp 8,800.00 0.010 Kg Paku Biasa Rp 20,000.00 Rp 200.00 0.005 Kayu 3/20 Kelas III (Papan) Rp 2,200,000.00 Rp 11,000.00 0.100 Oh Tukang Kayu Rp 55,500.00 Rp 5,550.00 0.100 Oh Pekerja Rp 49,000.00 Rp 4,900.00 0.010 Oh Kepala Tukang Rp 67,000.00 Rp 670.00 0.005 Oh Mandor Rp 69,000.00 Rp 345.00

Rp 31,465.00 I0.120 Kayu Kelas III Rp 2,200,000.00 Rp 264,000.00 0.300 Kg Paku Biasa Rp 20,000.00 Rp 6,000.00 0.400 Kaki Seng Gelombang Rp 7,300.00 Rp 2,920.00 2.000 Oh Tukang Kayu Rp 55,500.00 Rp 111,000.00 1.000 Oh Pekerja Rp 49,000.00 Rp 49,000.00 0.200 Oh Kepala Tukang Rp 67,000.00 Rp 13,400.00 0.050 Oh Mandor Rp 69,000.00 Rp 3,450.00

Rp 449,770.00

0.140 Oh Pekerja Rp 49,000.00 Rp 6,860.00 0.070 Oh Kepala Tukang Rp 67,000.00 Rp 4,690.00

Rp 11,550.00

0.120 Oh Pekerja Rp 49,000.00 Rp 5,880.00 0.050 Oh Kepala Tukang Rp 67,000.00 Rp 3,350.00

Rp 9,230.00

M3

M3

1 M2 Pembuatan Gudang Sementara dan Alat-AlatM3

1 M2 Membongkar Lantai Keramik

1 M2 Membongkar Plafond dan Rangka

Page 11: Latihan RAB

II. ANALISA BIAYA KONSTRUKSI PEKERJAAN TANAHI0.400 Oh Pekerja Rp 49,000.00 Rp 19,600.00 0.040 Oh Mandor Rp 69,000.00 Rp 2,760.00

Rp 22,360.00 I0.192 Oh Pekerja Rp 49,000.00 Rp 9,408.00 0.019 Oh Mandor Rp 69,000.00 Rp 1,311.00

Rp 10,719.00 I1.200 Pasir Urug Rp 71,333.33 Rp 85,600.00 0.300 Oh Pekerja Rp 49,000.00 Rp 14,700.00 0.010 Oh Mandor Rp 69,000.00 Rp 690.00

Rp 100,990.00 I1.200 Sirtu Rp 63,000.00 Rp 75,600.00 0.250 Oh Pekerja Rp 49,000.00 Rp 12,250.00 0.025 Oh Mandor Rp 69,000.00 Rp 1,725.00

Rp 89,575.00 III. ANALISA BIAYA KONSTRUKSI PEKERJAAN PONDASI

I1.100 Batu Kali Rp 139,000.00 Rp 152,900.00 3.260 Zak Portland Semen Rp 57,000.00 Rp 185,820.00 0.500 Pasir Pasang Rp 130,000.00 Rp 65,000.00 1.500 Oh Pekerja Rp 49,000.00 Rp 73,500.00 0.600 Oh Tukang Batu Rp 55,500.00 Rp 33,300.00 0.060 Oh Kepala Tukang Rp 67,000.00 Rp 4,020.00 0.075 Oh Mandor Rp 69,000.00 Rp 5,175.00

Rp 519,715.00 I1.200 Batu Kali Rp 139,000.00 Rp 166,800.00 0.300 Pasir Urug Rp 71,333.33 Rp 21,400.00 0.780 Oh Pekerja Rp 49,000.00 Rp 38,220.00 0.390 Oh Tukang Batu Rp 55,500.00 Rp 21,645.00 0.039 Oh Kepala Tukang Rp 67,000.00 Rp 2,613.00 0.039 Oh Mandor Rp 69,000.00 Rp 2,691.00

Rp 253,369.00

IV. ANALISA BIAYA KONSTRUKSI PEKERJAAN DINDINGI140.000 Bh Batu Merah Rp 600.00 Rp 84,000.00 0.870 Zak Portland Semen Rp 57,000.00 Rp 49,590.00 0.080 Pasir Pasang Rp 130,000.00 Rp 10,400.00 0.625 Oh Pekerja Rp 49,000.00 Rp 30,625.00 0.200 Oh Tukang Batu Rp 55,500.00 Rp 11,100.00 0.020 Oh Kepala Tukang Rp 67,000.00 Rp 1,340.00 0.030 Oh Mandor Rp 69,000.00 Rp 2,070.00

Rp 189,125.00 I70.000 Bh Batu Merah Rp 600.00 Rp 42,000.00 0.379 Zak Portland Semen Rp 57,000.00 Rp 21,603.00 0.038 Pasir Pasang Rp 130,000.00 Rp 4,940.00 0.320 Oh Pekerja Rp 49,000.00 Rp 15,680.00 0.100 Oh Tukang Batu Rp 55,500.00 Rp 5,550.00 0.010 Oh Kepala Tukang Rp 67,000.00 Rp 670.00 0.015 Oh Mandor Rp 69,000.00 Rp 1,035.00

Rp 91,478.00 I70.000 Bh Batu Merah Rp 600.00 Rp 42,000.00 0.134 Zak Portland Semen Rp 57,000.00 Rp 7,638.00 0.045 Pasir Pasang Rp 130,000.00 Rp 5,850.00 0.320 Oh Pekerja Rp 49,000.00 Rp 15,680.00 0.100 Oh Tukang Batu Rp 55,500.00 Rp 5,550.00 0.010 Oh Kepala Tukang Rp 67,000.00 Rp 670.00 0.015 Oh Mandor Rp 69,000.00 Rp 1,035.00

Rp 78,423.00

1 M3 Galian Tanah Biasa

1 M3 Urugan Tanah Kembali

1 M3 Urugan PasirM3

1 M3 Urugan SirtuM3

1 M3 Pasangan Pondasi Batu Kali Camp. 1 PC : 4 PSM3

M3

1 M3 Pasangan Pondasi Batu KosongM3

M3

1 M2 Pasangan Batu Bata Tebal 1 Bata Camp. 1 PC : 2 PS

M3

1 M2 Pasangan Batu Bata Tebal 1/2 Bata Camp. 1 PC : 2 PS

M3

1 M2 Pasangan Batu Bata Tebal 1/2 Bata Camp. 1 PC : 5 PS

M3

Page 12: Latihan RAB

V. ANALISA BIAYA KONSTRUKSI PEKERJAAN PLESTERANV0.170 Zak Portland Semen Rp 57,000.00 Rp 9,690.00 0.017 Pasir Pasang Rp 130,000.00 Rp 2,210.00 0.200 Oh Pekerja Rp 49,000.00 Rp 9,800.00 0.150 Oh Tukang Batu Rp 55,500.00 Rp 8,325.00 0.015 Oh Kepala Tukang Rp 67,000.00 Rp 1,005.00 0.100 Oh Mandor Rp 69,000.00 Rp 6,900.00

Rp 37,930.00 V0.130 Zak Portland Semen Rp 57,000.00 Rp 7,410.00 0.019 Pasir Pasang Rp 130,000.00 Rp 2,470.00 0.200 Oh Pekerja Rp 49,000.00 Rp 9,800.00 0.150 Oh Tukang Batu Rp 55,500.00 Rp 8,325.00 0.015 Oh Kepala Tukang Rp 67,000.00 Rp 1,005.00 0.010 Oh Mandor Rp 69,000.00 Rp 690.00

Rp 29,700.00 V0.086 Zak Portland Semen Rp 57,000.00 Rp 4,902.00 0.022 Pasir Pasang Rp 130,000.00 Rp 2,860.00 0.200 Oh Pekerja Rp 49,000.00 Rp 9,800.00 0.150 Oh Tukang Batu Rp 55,500.00 Rp 8,325.00 0.015 Oh Kepala Tukang Rp 67,000.00 Rp 1,005.00 0.010 Oh Mandor Rp 69,000.00 Rp 690.00

Rp 27,582.00

V0.086 Zak Portland Semen Rp 57,000.00 Rp 4,902.00 0.016 Pasir Pasang Rp 130,000.00 Rp 2,080.00 0.150 Oh Pekerja Rp 49,000.00 Rp 7,350.00 0.070 Oh Tukang Batu Rp 55,500.00 Rp 3,885.00 0.007 Oh Kepala Tukang Rp 67,000.00 Rp 469.00 0.008 Oh Mandor Rp 69,000.00 Rp 552.00

Rp 19,238.00

0.063 Zak Portland Semen Rp 57,000.00 Rp 3,562.50 0.020 Oh Pekerja Rp 49,000.00 Rp 980.00 0.063 Oh Tukang Batu Rp 55,500.00 Rp 3,496.50 0.006 Oh Kepala Tukang Rp 67,000.00 Rp 422.10 0.010 Oh Mandor Rp 69,000.00 Rp 690.00

Rp 9,151.10 VI. ANALISA BIAYA KONSTRUKSI PEKERJAAN KAYU

V1.100 Kayu Kelas II (Balok) Rp 2,700,000.00 Rp 2,970,000.00 6.000 Oh Pekerja Rp 49,000.00 Rp 294,000.00 20.000 Oh Tukang Kayu Rp 55,500.00 Rp 1,110,000.00 2.000 Oh Kepala Tukang Rp 67,000.00 Rp 134,000.00 0.300 Oh Mandor Rp 69,000.00 Rp 20,700.00

Rp 4,528,700.00 V0.040 Kayu Kelas II (Papan) Rp 2,700,000.00 Rp 108,000.00 1.000 Oh Pekerja Rp 49,000.00 Rp 49,000.00 2.500 Oh Tukang Kayu Rp 55,500.00 Rp 138,750.00 0.250 Oh Kepala Tukang Rp 67,000.00 Rp 16,750.00 0.050 Oh Mandor Rp 69,000.00 Rp 3,450.00

Kayu Kelas II (Papan) Rp 315,950.00 V0.035 Kayu Kelas II (Papan) Rp 2,700,000.00 Rp 94,500.00 1.100 Kaca 5 MM Rp 133,200.00 Rp 146,520.00 0.800 Oh Pekerja Rp 49,000.00 Rp 39,200.00 2.000 Oh Tukang Kayu Rp 55,500.00 Rp 111,000.00 0.200 Oh Kepala Tukang Rp 67,000.00 Rp 13,400.00 0.040 Oh Mandor Rp 69,000.00 Rp 2,760.00

Kayu Kelas II (Papan) Rp 407,380.00

1 M2 Plesteran 1 PC : 2 PS Tebal 15 MM

M3

1 M2 Plesteran 1 PC : 3 PS Tebal 15 MM

M3

1 M2 Plesteran 1 PC : 5 PS Tebal 15 MM

M3

1 M2 Plesteran Siar Adukan 1 PC : 2 PS

M3

1 M2 Plesteran Siar Acian Semen

1 M3 Pasangan Kusen Pintu dan Jendela Kayu Kelas IIM3

1 M2 Pasangan Daun Pintu PanilM3

1 M2 Pasangan Pintu dan Jendela KacaM3

M3

Page 13: Latihan RAB

V0.064 Kayu Kelas II (Papan) Rp 2,700,000.00 Rp 172,800.00 1.000 Oh Pekerja Rp 49,000.00 Rp 49,000.00 3.000 Oh Tukang Kayu Rp 55,500.00 Rp 166,500.00 0.300 Oh Kepala Tukang Rp 67,000.00 Rp 20,100.00 0.300 Oh Mandor Rp 69,000.00 Rp 20,700.00

Kayu Kelas II (Papan) Rp 429,100.00 V1.000 M2 Pintu Rooling1.000 Oh Pekerja Rp 49,000.00 Rp 49,000.00 1.000 Oh Tukang Kayu Rp 55,500.00 Rp 55,500.00 0.100 Oh Kepala Tukang Rp 67,000.00 Rp 6,700.00 0.050 Oh Mandor Rp 69,000.00 Rp 3,450.00

Pintu Rooling Rp 114,650.00 V0.060 Kayu Kelas II (Papan) Rp 2,700,000.00 Rp 162,000.00 0.150 Kg Paku Biasa Rp 20,000.00 Rp 3,000.00 0.500 Oh Pekerja Rp 49,000.00 Rp 24,500.00 2.000 Oh Tukang Kayu Rp 55,500.00 Rp 111,000.00 0.200 Oh Kepala Tukang Rp 67,000.00 Rp 13,400.00 0.025 Oh Mandor Rp 69,000.00 Rp 1,725.00

Kayu Kelas II (Papan) Rp 315,625.00 V1.100 Kayu Kelas II (Balok) Rp 2,700,000.00 Rp 2,970,000.00 15.000 Kg Besi Strip Rp - 0.800 Kg Paku Biasa Rp 20,000.00 Rp 16,000.00 4.000 Oh Pekerja Rp 49,000.00 Rp 196,000.00 12.000 Oh Tukang Kayu Rp 55,500.00 Rp 666,000.00 1.200 Oh Kepala Tukang Rp 67,000.00 Rp 80,400.00 0.200 Oh Mandor Rp 69,000.00 Rp 13,800.00

Kayu Kelas II (Balok) Rp 3,942,200.00

1.100 Kayu Kelas II (Balok) Rp 2,700,000.00 Rp 2,970,000.00 0.800 Kg Paku Biasa Rp 20,000.00 Rp 16,000.00 4.000 Oh Pekerja Rp 49,000.00 Rp 196,000.00 12.000 Oh Tukang Kayu Rp 55,500.00 Rp 666,000.00 1.200 Oh Kepala Tukang Rp 67,000.00 Rp 80,400.00 0.200 Oh Mandor Rp 69,000.00 Rp 13,800.00

Kayu Kelas II (Balok) Rp 3,942,200.00

0.011 Kayu Kelas II (Balok) Rp 2,700,000.00 Rp 29,700.00 0.150 Kg Paku Biasa Rp 20,000.00 Rp 3,000.00 0.100 Oh Pekerja Rp 49,000.00 Rp 4,900.00 0.100 Oh Tukang Kayu Rp 55,500.00 Rp 5,550.00 0.010 Oh Kepala Tukang Rp 67,000.00 Rp 670.00 0.005 Oh Mandor Rp 69,000.00 Rp 345.00

Kayu Kelas II (Balok) Rp 44,165.00 V0.007 Kayu Kelas III (Balok) Rp 2,200,000.00 Rp 15,400.00 0.100 Kg Paku Biasa Rp 20,000.00 Rp 2,000.00 0.125 Oh Pekerja Rp 49,000.00 Rp 6,125.00 0.125 Oh Tukang Kayu Rp 55,500.00 Rp 6,937.50 0.0125 Oh Kepala Tukang Rp 67,000.00 Rp 837.50 0.075 Oh Mandor Rp 69,000.00 Rp 5,175.00

Kayu Kelas III (Balok) Rp 36,475.00 V1 M' Pasangan Lisplank Ukuran 2 x (2 x 20) Cm0.0086 Kayu Kelas II (Papan) Rp 2,700,000.00 Rp 23,220.00 0.060 Kg Paku Biasa Rp 20,000.00 Rp 1,200.00 0.100 Oh Pekerja Rp 49,000.00 Rp 4,900.00 0.100 Oh Tukang Kayu Rp 55,500.00 Rp 5,550.00 0.010 Oh Kepala Tukang Rp 67,000.00 Rp 670.00 0.050 Oh Mandor Rp 69,000.00 Rp 3,450.00

Kayu Kelas II (Papan) Rp 38,990.00

1 M2 Pasangan Pintu dan Jendela JalusiM3

1 M2 Pasangan Pintu Rooling Aluminium

1 M2 Pasangan Jelusi MatiM3

1 M3 Pasangan Konstruksi Kuda-Kuda KayuM3

1 M3 Pasangan Konstruksi Gording KayuM3

1 M2 Pasangan Rangka AtapM3

1 M2 Pasangan Rangka Langit-LangitM3

M3

Page 14: Latihan RAB

VII. ANALISA BIAYA KONSTRUKSI PEKERJAAN BETONV4.360 Zak Portland Semen Rp 57,000.00 Rp 248,520.00 0.520 Pasir Beton Rp 130,000.00 Rp 67,600.00 0.870 Kerikil Beton Rp 450,000.00 Rp 391,500.00 1.650 Oh Pekerja Rp 49,000.00 Rp 80,850.00 0.250 Oh Tukang Batu Rp 55,500.00 Rp 13,875.00 0.025 Oh Kepala Tukang Rp 67,000.00 Rp 1,675.00 0.080 Oh Mandor Rp 69,000.00 Rp 5,520.00

Rp 809,540.00

V1 M2 Pasang Bekisting Untuk SloofBahan0.045 M3 Kayu Mal (Bekisting) Rp 1,700,000.00 Rp 76,500.00 0.300 Kg Paku Biasa Rp 20,000.00 Rp 6,000.00

Rp 82,500.00

Pekerja0.300 Oh Pekerja Rp 49,000.00 Rp 14,700.00 0.260 Oh Tukang Kayu Rp 55,500.00 Rp 14,430.00 0.026 Oh Kepala Tukang Rp 67,000.00 Rp 1,742.00 0.005 Oh Mandor Rp 69,000.00 Rp 345.00

Rp 31,217.00 Jumlah I+II Rp 113,717.00

V1 M2 Pasang Bekisting Untuk KolomBahan0.040 M3 Kayu Mal (Bekisting) Rp 1,700,000.00 Rp 68,000.00 0.400 Kg Paku Biasa Rp 20,000.00 Rp 8,000.00 0.015 M3 Kayu Mal/ Bekisting (Balok) Rp 1,700,000.00 Rp 25,500.00 2.000 Btg Dolken Kayu Galam Ø8-10 Rp 15,000.00 Rp 30,000.00

(a) Rp 131,500.00 U/ 2x Pakai = 1/2 x (a) ……….. I Rp 65,750.00

Pekerja0.300 Oh Pekerja Rp 49,000.00 Rp 14,700.00 0.330 Oh Tukang Kayu Rp 55,500.00 Rp 18,315.00 0.033 Oh Kepala Tukang Rp 67,000.00 Rp 2,211.00 0.006 Oh Mandor Rp 69,000.00 Rp 414.00

II Rp 35,640.00 Jumlah I + II Rp 101,390.00

V1 M2 Pasang Bekisting Untuk BalokBahan0.024 M3 Kayu Mal (Bekisting) Rp 1,700,000.00 Rp 41,140.00 0.400 Kg Paku Biasa Rp 20,000.00 Rp 8,000.00 0.010 M3 Kayu Mal/ Bekisting (Balok) Rp 1,700,000.00 Rp 17,000.00 2.000 Btg Dolken Kayu Galam Ø8-10 Rp 15,000.00 Rp 30,000.00

(a) Rp 96,140.00 U/ 2x Pakai = 1/2 x (a) ……….. I Rp 48,070.00

Pekerja0.320 Oh Pekerja Rp 49,000.00 Rp 15,680.00 0.330 Oh Tukang Kayu Rp 55,500.00 Rp 18,315.00 0.033 Oh Kepala Tukang Rp 67,000.00 Rp 2,211.00 0.006 Oh Mandor Rp 69,000.00 Rp 414.00

II Rp 36,620.00 Jumlah I + II Rp 84,690.00

V1 M2 Pasang Bekisting Untuk LantaiBahan0.024 M3 Kayu Mal (Bekisting) Rp 1,700,000.00 Rp 41,140.00 0.400 Kg Paku Biasa Rp 20,000.00 Rp 8,000.00 0.010 M3 Kayu Mal/ Bekisting (Balok) Rp 1,700,000.00 Rp 17,000.00 4.000 Btg Dolken Kayu Galam Ø8-10 Rp 15,000.00 Rp 60,000.00

(a) Rp 126,140.00 U/ 2x Pakai = 1/2 x (a) ……….. I Rp 63,070.00

Pekerja0.320 Oh Pekerja Rp 49,000.00 Rp 15,680.00 0.330 Oh Tukang Kayu Rp 55,500.00 Rp 18,315.00 0.033 Oh Kepala Tukang Rp 67,000.00 Rp 2,211.00 0.006 Oh Mandor Rp 69,000.00 Rp 414.00

II Rp 36,620.00 Jumlah I + II Rp 99,690.00

1 M3 Membuat Beton Tumbuk 1 PC : 3 PS : 5 KR

M3

M3

Page 15: Latihan RAB

V1 M2 Pasang Bekisting Untuk DindingBahan0.024 M3 Kayu Mal (Bekisting) Rp 1,700,000.00 Rp 41,140.00 0.400 Kg Paku Biasa Rp 20,000.00 Rp 8,000.00 0.010 M3 Kayu Mal/ Bekisting (Balok) Rp 1,700,000.00 Rp 17,000.00 2.000 Lbr Dolken Kayu Galam Ø8-10 Rp 9,900.00 Rp 19,800.00 4.000 Btg Penjaga Jarak Bekisting Rp 9,900.00 Rp 39,600.00

(a) Rp 125,540.00 U/ 2x Pakai = 1/2 x (a) ……….. I Rp 62,770.00

Pekerja0.320 Oh Pekerja Rp 49,000.00 Rp 15,680.00 0.330 Oh Tukang Kayu Rp 55,500.00 Rp 18,315.00 0.033 Oh Kepala Tukang Rp 67,000.00 Rp 2,211.00 0.006 Oh Mandor Rp 69,000.00 Rp 414.00

II Rp 36,620.00 Jumlah I + II Rp 99,390.00

V1 Kg Pembesian Dengan Besi Polos1.050 Kg Besi Beton Polos Rp 12,000.00 Rp 12,600.00 0.015 Kg Kawat Beton Rp 15,000.00 Rp 225.00 0.007 Oh Tukang Besi Rp 55,500.00 Rp 388.50

Rp 13,213.50

V1 M3 Membuat Beton Dengan Mutu K 1756.460 zak Semen Portland Rp 57,000.00 Rp 368,220.00 0.520 M3 Pasir Beton Rp 130,000.00 Rp 67,600.00 0.780 M3 Kerikil Beton Rp 150,000.00 Rp 117,000.00 4.850 Oh Pekerja Rp 49,000.00 Rp 237,650.00 0.350 Oh Tukang Batu Rp 55,500.00 Rp 19,425.00 0.331 Oh Kepala Tukang Rp 67,000.00 Rp 22,177.00 0.170 Oh Mandor Rp 69,000.00 Rp 11,730.00

Rp 843,802.00

VIII. ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP ATAPV6.667 Kaki Atap Seng Gelombang Rp 7,300.00 Rp 48,669.10 0.020 Kg Paku Seng Rp 35,000.00 Rp 700.00 0.120 Oh Pekerja Rp 49,000.00 Rp 5,880.00 0.060 Oh Tukang Kayu Rp 55,500.00 Rp 3,330.00 0.006 Oh Kepala Tukang Rp 67,000.00 Rp 402.00 0.006 Oh Mandor Rp 69,000.00 Rp 414.00

Rp 59,395.10

1.600 Lbr Genteng Metal Rp 47,000.00 Rp 75,200.00 0.020 Kg Paku Seng Rp 55,500.00 Rp 1,110.00 0.120 Oh Pekerja Rp 49,000.00 Rp 5,880.00 0.060 Oh Tukang Kayu Rp 55,500.00 Rp 3,330.00 0.006 Oh Kepala Tukang Rp 67,000.00 Rp 402.00 0.006 Oh Mandor Rp 69,000.00 Rp 414.00

Rp 86,336.00 V1 M' Pasang Nok Atap Seng0.300 Lbr Seng Plat Rp 50,000.00 Rp 15,000.00 0.040 Kg Paku Seng Rp 35,000.00 Rp 1,400.00 0.150 Oh Pekerja Rp 49,000.00 Rp 7,350.00 0.070 Oh Tukang Kayu Rp 55,500.00 Rp 3,885.00 0.008 Oh Kepala Tukang Rp 67,000.00 Rp 536.00 0.006 Oh Mandor Rp 69,000.00 Rp 414.00

Rp 28,585.00 V1 M' Pasang Talang Atap Seng Plat0.300 Lbr Seng Plat Rp 50,000.00 Rp 15,000.00 0.015 Kg Paku Biasa Rp 20,000.00 Rp 300.00 0.019 Kayu Kelas II Rp 2,700,000.00 Rp 51,300.00 0.300 Kg Meni Besi Rp 6,500.00 Rp 1,950.00 0.040 Oh Pekerja Rp 49,000.00 Rp 1,960.00 0.400 Oh Tukang Kayu Rp 55,500.00 Rp 22,200.00 0.025 Oh Kepala Tukang Rp 67,000.00 Rp 1,675.00 0.001 Oh Mandor Rp 69,000.00 Rp 69.00

Rp 94,454.00

1 M2 Pasang Atap Seng Gelombang

1 M2 Pasang Atap Genteng Metal

M3

Page 16: Latihan RAB

IX. ANALISA BIAYA KONSTRUKSI PEKERJAAN PLAFONDI0.360 Lbr Tripleks Rp 51,000.00 Rp 18,360.00 0.030 Kg Paku Tripleks Rp 22,800.00 Rp 684.00 0.070 Oh Pekerja Rp 49,000.00 Rp 3,430.00 0.100 Oh Tukang Kayu Rp 55,500.00 Rp 5,550.00 0.010 Oh Kepala Tukang Rp 67,000.00 Rp 670.00 0.004 Oh Mandor Rp 69,000.00 Rp 276.00

Rp 28,970.00

0.360 Lbr Kalsibord (120x240x5) Rp 110,000.00 Rp 39,600.00 0.110 Kg Paku Gypsum Rp 15,500.00 Rp 1,705.00 0.100 Oh Pekerja Rp 49,000.00 Rp 4,900.00 0.050 Oh Tukang Kayu Rp 55,500.00 Rp 2,775.00 0.005 Oh Kepala Tukang Rp 67,000.00 Rp 335.00 0.005 Oh Mandor Rp 69,000.00 Rp 345.00

Rp 49,660.00 I1 M' Pasang List Plafond Kayu Profil 3 x 3 Cm0.250 M' List Kayu Profil 3 x 3 Cm Rp 11,500.00 Rp 2,875.00 0.001 Kg Paku Biasa Rp 20,000.00 Rp 20.00 0.025 Oh Pekerja Rp 49,000.00 Rp 1,225.00 0.025 Oh Tukang Kayu Rp 55,500.00 Rp 1,387.50 0.003 Oh Kepala Tukang Rp 67,000.00 Rp 167.50 0.003 Oh Mandor Rp 69,000.00 Rp 172.50

Rp 5,847.50 1 M' List Langit-Langit Profil Gisum 8x8 cm1.100 M' Profil Gipsum 8x8cm Type A1 Rp 20,000.00 Rp 22,000.00 0.010 Kg Paku Biasa Rp 20,000.00 Rp 200.00 0.050 Oh Pekerja Rp 49,000.00 Rp 2,450.00 0.050 Oh Tukang Kayu Rp 55,500.00 Rp 2,775.00 0.005 Oh Kepala Tukang Rp 67,000.00 Rp 335.00 0.003 Oh Mandor Rp 69,000.00 Rp 172.50

Rp 27,932.50 X. ANALISA BIAYA KONSTRUKSI PEKERJAAN SANITASI

XMemasang 1 Buah Closet Duduk1.000 Bh Closet Duduk Rp 550,000.00 Rp 550,000.00 0.060 Perlengkapan (Harga Closet) Rp 33,000.00 Rp 1,980.00 3.300 Oh Pekerja Rp 49,000.00 Rp 161,700.00 1.100 Oh Tukang Batu Rp 55,500.00 Rp 61,050.00 0.001 Oh Kepala Tukang Rp 67,000.00 Rp 67.00 0.160 Oh Mandor Rp 69,000.00 Rp 11,040.00

Rp 785,837.00 XMemasang 1 Buah Closet Jongkok1.000 Bh Closet Jongkok (INA) Rp 150,000.00 Rp 150,000.00 0.120 Zak Portland Semen Rp 57,000.00 Rp 6,840.00 0.010 Pasir Pasang Rp 130,000.00 Rp 1,300.00 1.000 Oh Pekerja Rp 49,000.00 Rp 49,000.00 1.500 Oh Tukang Batu Rp 55,500.00 Rp 83,250.00 1.500 Oh Kepala Tukang Rp 67,000.00 Rp 100,500.00 0.160 Oh Mandor Rp 69,000.00 Rp 11,040.00

Rp 401,930.00 XMemasang 1 Buah Urinoir1.000 Bh Urinoir Rp 500,000.00 Rp 500,000.00 0.030 Perlengkapan (Harga Bahan) Rp 15,000.00 Rp 450.00 0.120 Zak Portland Semen Rp 57,000.00 Rp 6,840.00 0.010 Pasir Pasang Rp 130,000.00 Rp 1,300.00 1.000 Oh Pekerja Rp 49,000.00 Rp 49,000.00 1.000 Oh Tukang Batu Rp 55,500.00 Rp 55,500.00 0.100 Oh Kepala Tukang Rp 67,000.00 Rp 6,700.00 0.100 Oh Mandor Rp 69,000.00 Rp 6,900.00

Rp 626,690.00 XMemasang 1 Buah Wastafel1.000 Bh Wastafel Rp 253,000.00 Rp 253,000.00 0.120 Perlengkapan (Harga Bahan) Rp 30,360.00 Rp 3,643.20 0.120 Zak Portland Semen Rp 57,000.00 Rp 6,840.00 0.010 Pasir Pasang Rp 49,000.00 Rp 490.00 1.200 Oh Pekerja Rp 49,000.00 Rp 58,800.00 1.450 Oh Tukang Batu Rp 55,500.00 Rp 80,475.00 0.150 Oh Kepala Tukang Rp 67,000.00 Rp 10,050.00 0.100 Oh Mandor Rp 69,000.00 Rp 6,900.00

Rp 420,198.20

1 M2 Pasang Plafond Tripleks

1 M2 Pasang Plafond Kalsiboard 3,5 mm

M3

M3

M3

Page 17: Latihan RAB

X1.000 Bh Bak Fiber Glass Rp 100,000.00 Rp 100,000.00 0.180 Perlengkapan (Harga Bahan) Rp 18,000.00 Rp 3,240.00 1.800 Oh Pekerja Rp 49,000.00 Rp 88,200.00 2.700 Oh Tukang Batu Rp 55,500.00 Rp 149,850.00 0.540 Oh Kepala Tukang Rp 67,000.00 Rp 36,180.00 0.110 Oh Mandor Rp 69,000.00 Rp 7,590.00

Rp 385,060.00 X280.000 Batu Bata Rp 600.00 Rp 168,000.00 2.400 Zak Portland Semen Rp 57,000.00 Rp 136,800.00 0.300 Pasir Pasang Rp 49,000.00 Rp 14,700.00 4.356 Dos Tegel Kramik Rp 53,500.00 Rp 233,046.00 6.000 Kg Semen Nat Rp 15,000.00 Rp 90,000.00 6.000 Oh Pekerja Rp 49,000.00 Rp 294,000.00 3.000 Oh Tukang Batu Rp 55,500.00 Rp 166,500.00 0.300 Oh Kepala Tukang Rp 67,000.00 Rp 20,100.00 0.300 Oh Mandor Rp 69,000.00 Rp 20,700.00

Rp 1,143,846.00 XMemasang 1 Buah Kran Air1.000 Bh Kran Air Rp 18,000.00 Rp 18,000.00 0.025 Bh Seal Tape Rp 5,000.00 Rp 125.00 0.010 Oh Pekerja Rp 49,000.00 Rp 490.00 0.100 Oh Tukang Batu Rp 55,500.00 Rp 5,550.00 0.010 Oh Kepala Tukang Rp 67,000.00 Rp 670.00 0.005 Oh Mandor Rp 69,000.00 Rp 345.00

Rp 25,180.00 XMemasang 1 Buah Floor Drain1.000 Bh Floor Drain Rp 19,000.00 Rp 19,000.00 0.010 Oh Pekerja Rp 49,000.00 Rp 490.00 0.100 Oh Tukang Batu Rp 55,500.00 Rp 5,550.00 0.010 Oh Kepala Tukang Rp 67,000.00 Rp 670.00 0.005 Oh Mandor Rp 69,000.00 Rp 345.00

Rp 26,055.00

XI. ANALISA BIAYA KONSTRUKSI PEKERJAAN KUNCI DAN KACAX1 Buah Pasang Kunci Tanam1.000 Bh Kunci Tanam 2XPutar Rp 84,000.00 Rp 84,000.00 0.010 Oh Pekerja Rp 49,000.00 Rp 490.00 0.500 Oh Tukang Kayu Rp 55,500.00 Rp 27,750.00 0.010 Oh Kepala Tukang Rp 67,000.00 Rp 670.00 0.005 Oh Mandor Rp 69,000.00 Rp 345.00

Rp 113,255.00 XI Buah Pasang Engsel Pintu1.000 Bh Engsel Pintu Rp 5,000.00 Rp 5,000.00 0.015 Oh Pekerja Rp 49,000.00 Rp 735.00 0.150 Oh Tukang Kayu Rp 55,500.00 Rp 8,325.00 0.015 Oh Kepala Tukang Rp 67,000.00 Rp 1,005.00 0.001 Oh Mandor Rp 69,000.00 Rp 69.00

Rp 15,134.00 XI Buah Pasang Engsel Jendela1.000 Bh Engsel Jendela Rp 4,500.00 Rp 4,500.00 0.010 Oh Pekerja Rp 49,000.00 Rp 490.00 0.100 Oh Tukang Kayu Rp 55,500.00 Rp 5,550.00 0.010 Oh Kepala Tukang Rp 67,000.00 Rp 670.00 0.001 Oh Mandor Rp 69,000.00 Rp 69.00

Rp 11,279.00 X1 Buah Pasang Hak Angin1.000 Bh Hak Angin Besar Rp 14,400.00 Rp 14,400.00 1.000 Bh Hak Angin Kecil Rp 12,000.00 Rp 12,000.00 0.015 Oh Pekerja Rp 49,000.00 Rp 735.00 0.150 Oh Tukang Kayu Rp 55,500.00 Rp 8,325.00 0.015 Oh Kepala Tukang Rp 67,000.00 Rp 1,005.00 0.001 Oh Mandor Rp 69,000.00 Rp 69.00

Hak Angin Besar Rp 24,534.00 Hak Angin Kecil Rp 22,134.00

Memasang 1 Buah Bak Mandi Fiber Glass Volume 0,3 M3

Memasang 1 Buah Bak Mandi Batu Bata Volume 0,03 M3

M3

M3

Page 18: Latihan RAB

X1.100 Kaca t. 5 mm Rp 133,200.00 Rp 146,520.00 0.015 Oh Pekerja Rp 49,000.00 Rp 735.00 0.150 Oh Tukang Kayu Rp 55,500.00 Rp 8,325.00 0.015 Oh Kepala Tukang Rp 67,000.00 Rp 1,005.00 0.001 Oh Mandor Rp 69,000.00 Rp 51.75

Rp 156,636.75

Memasang 1 m' pipa GIP type Medium B ؾ"1.2000 m' Pipa GIP Rp 32,500.00 Rp 39,000.00 1.0000 Set Perlengkapan (35% harga pipa) Rp 11,375.00 Rp 11,375.00 0.0360 Oh Pekerja Rp 49,000.00 Rp 1,764.00 0.0600 Oh Tukang pipa Rp 55,500.00 Rp 3,330.00 0.0060 Oh Kepala tukang Rp 67,000.00 Rp 402.00 0.0018 Oh Mandor Rp 69,000.00 Rp 124.20

Rp 55,995.20

Memasang 1 m' pipa PVC type AW ؾ"1.2000 m' Pipa PVC Rp 5,125.00 Rp 6,150.00 1.0000 Set Perlengkapan (35% harga pipa) Rp 1,793.75 Rp 1,793.75 0.0360 Oh Pekerja Rp 49,000.00 Rp 1,764.00 0.0600 Oh Tukang pipa Rp 55,500.00 Rp 3,330.00 0.0060 Oh Kepala tukang Rp 67,000.00 Rp 402.00 0.0018 Oh Mandor Rp 69,000.00 Rp 124.20

Rp 13,563.95

Memasang 1 m' pipa PVC type AW Ø2"1.2000 m' Pipa PVC Rp 13,875.00 Rp 16,650.00 1.0000 Set Perlengkapan (35% harga pipa) Rp 4,856.25 Rp 4,856.25 0.0360 Oh Pekerja Rp 49,000.00 Rp 1,764.00 0.0600 Oh Tukang pipa Rp 55,500.00 Rp 3,330.00 0.0060 Oh Kepala tukang Rp 67,000.00 Rp 402.00 0.0018 Oh Mandor Rp 69,000.00 Rp 124.20

Rp 27,126.45

Memasang 1 m' pipa PVC type AW Ø3"1.2000 m' Pipa PVC Rp 28,000.00 Rp 33,600.00 1.0000 Set Perlengkapan (35% harga pipa) Rp 9,800.00 Rp 9,800.00 0.0810 Oh Pekerja Rp 49,000.00 Rp 3,969.00 0.1350 Oh Tukang pipa Rp 55,500.00 Rp 7,492.50 0.0135 Oh Kepala tukang Rp 67,000.00 Rp 904.50 0.0041 Oh Mandor Rp 69,000.00 Rp 282.90

Rp 56,048.90

XII. ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP LANTAI DAN DINDINGX1.000 Dos Tegel Keramik 30 x 30 Cm (Putih) Rp 42,300.00 Rp 42,300.00 1.000 Dos Tegel Keramik 20 x 20 Cm (Warna) Rp 49,000.00 Rp 49,000.00 0.200 Zak Portland Semen Rp 57,000.00 Rp 11,400.00 0.022 Pasir Pasang Rp 130,000.00 Rp 2,860.00 1.300 Kg Semen Warna Rp 10,000.00 Rp 13,000.00 0.260 Oh Pekerja Rp 49,000.00 Rp 12,740.00 0.120 Oh Tukang Batu Rp 55,500.00 Rp 6,660.00 0.012 Oh Kepala Tukang Rp 67,000.00 Rp 804.00 0.013 Oh Mandor Rp 69,000.00 Rp 897.00

Tegel Keramik 30 x 30 Cm Rp 90,661.00 Tegel Keramik 20 x 20 Cm Rp 97,361.00

X1 M' Pasangan Tegel Plint Keramik1.111 Bh Tegel Kemaik 30 x 30 Rp 3,845.45 Rp 4,272.73 0.033 Zak Portland Semen Rp 57,000.00 Rp 1,881.00 0.003 Pasir Pasang Rp 130,000.00 Rp 390.00 0.100 Kg Semen Warna Rp 10,000.00 Rp 1,000.00 0.900 Oh Pekerja Rp 49,000.00 Rp 44,100.00 0.090 Oh Tukang Batu Rp 55,500.00 Rp 4,995.00 0.009 Oh Kepala Tukang Rp 67,000.00 Rp 603.00 0.005 Oh Mandor Rp 69,000.00 Rp 345.00

Plit Keramik 10 x 30 Rp 57,586.73

1 M2 Pasang Kaca MatiM2

1 M2 Pasangan Tegel Lantai Keramik

M3

M3

Page 19: Latihan RAB

X1.000 Dos Tegel Keramik 20 x 25 Rp 53,500.00 Rp 53,500.00 1.000 Dos Tegel Keramik 40 x 40 Rp 44,300.00 Rp 44,300.00 0.186 Zak Portland Semen Rp 57,000.00 Rp 10,602.00 0.018 Pasir Pasang Rp 130,000.00 Rp 2,340.00 1.500 Kg Semen Warna Rp 10,000.00 Rp 15,000.00 0.600 Oh Pekerja Rp 49,000.00 Rp 29,400.00 0.450 Oh Tukang Batu Rp 55,500.00 Rp 24,975.00 0.045 Oh Kepala Tukang Rp 67,000.00 Rp 3,015.00 0.030 Oh Mandor Rp 69,000.00 Rp 2,070.00

Tegel Keramik 20 x 25 Rp 140,902.00 Tegel Keramik 40 x 40 Rp 131,702.00

XIII. ANALISA BIAYA KONSTRUKSI PEKERJAAN PENGECETANX0.200 Kg Cat Meni Rp 13,000.00 Rp 2,600.00 0.200 Kg Cat Kayu Rp 40,000.00 Rp 8,000.00 0.070 Oh Pekerja Rp 49,000.00 Rp 3,430.00 0.009 Oh Tukang Cat Rp 55,500.00 Rp 499.50 0.006 Oh Kepala Tukang Rp 67,000.00 Rp 402.00 0.002 Oh Mandor Rp 69,000.00 Rp 138.00

Rp 15,069.50

0.170 Kg Cat Kayu Rp 40,000.00 Rp 6,800.00 0.070 Oh Pekerja Rp 49,000.00 Rp 3,430.00 0.009 Oh Tukang Cat Rp 55,500.00 Rp 499.50 0.006 Oh Kepala Tukang Rp 67,000.00 Rp 402.00 0.002 Oh Mandor Rp 69,000.00 Rp 138.00

Rp 11,269.50 X0.100 Kg Plamir Rp 10,800.00 Rp 1,080.00 0.260 Kg Cat Tembok Rp 15,000.00 Rp 3,900.00 0.200 Lbr Amplas Rp 2,000.00 Rp 400.00 0.020 Oh Pekerja Rp 49,000.00 Rp 980.00 0.063 Oh Tukang Cat Rp 55,500.00 Rp 3,496.50 0.006 Oh Kepala Tukang Rp 67,000.00 Rp 402.00 0.002 Oh Mandor Rp 69,000.00 Rp 138.00

Rp 10,396.50

0.180 Kg Cat Tembok metrolite Rp 15,000.00 Rp 2,700.00 0.180 Kg Cat Tembok DULUX Rp 50,000.00 Rp 9,000.00 0.020 Oh Pekerja Rp 49,000.00 Rp 980.00 0.063 Oh Tukang Cat Rp 55,500.00 Rp 3,496.50 0.006 Oh Kepala Tukang Rp 67,000.00 Rp 402.00 0.002 Oh Mandor Rp 69,000.00 Rp 138.00

Cat Tembok metrolite Rp 7,716.50 Cat Tembok DULUX Rp 14,016.50

X0.280 Kg Cat Tembok metrolite Rp 15,000.00 Rp 4,200.00 0.280 Kg Cat Tembok DULUX Rp 50,000.00 Rp 14,000.00 0.028 Oh Pekerja Rp 49,000.00 Rp 1,372.00 0.042 Oh Tukang Cat Rp 55,500.00 Rp 2,331.00 0.004 Oh Kepala Tukang Rp 67,000.00 Rp 268.00 0.002 Oh Mandor Rp 69,000.00 Rp 138.00

Cat Tembok metrolite Rp 8,309.00 Cat Tembok DULUX Rp 18,109.00

X0.260 Kg Cat Seng Rp 11,000.00 Rp 2,860.00 0.070 Oh Pekerja Rp 49,000.00 Rp 3,430.00 0.009 Oh Tukang Cat Rp 55,500.00 Rp 499.50 0.006 Oh Kepala Tukang Rp 67,000.00 Rp 402.00 0.002 Oh Mandor Rp 69,000.00 Rp 138.00

Rp 7,329.50

Rp - Rp - Rp -

Rp - Rp -

1 M2 Pasangan Dinding Keramik

M3

1 M2 Pengecetan Bidang Kayu Baru

1 M2 Pengecetan Bidang Kayu Lama

1 M2 Pengecetan Bidang Tembok Baru

1 M2 Pengecetan Bidang Tembok Lama

1 M2 Pengecetan Plafon

1 M2 Pengecetan Seng

Page 20: Latihan RAB

DAFTAR HARGA BAHAN

No NAMA BAHAN SATUAN HARGA KET.

1 Batu Kali Rp. 139,000

2 Batu Merah bh Rp. 600

3 Kerikil Beton Rp. 150,000 Rp. 450,000 /mbl

4 Pasir Pasangan Rp. 130,000

5 Pasir Beton Rp. 130,000

6 Tanah Timbunan Rp. 39,000

7 Sirtu Timbunan Rp. 63,000

8 Pasir Timbunan Rp. 71,333 Rp. 214,000 /mbl

9 Kapur Pasangan Zak Rp. 4,500

10 Semen (Portland Cement) 50 Kg - Tonasa Zak Rp. 57,000

11 Semen (Portland Cement) 50 Kg - Bosowa Zak Rp. 56,000

12 Semen Putih 50 Kg - Tiga Roda Zak Rp. 99,300

13 Kayu Kelas II - Balok Rp. 2,700,000

14 Kayu Kelas II - Papan Rp. 2,700,000

15 Kayu Kelas III - Balok Rp. 2,200,000

16 Kayu Kelas III - Papan Rp. 2,200,000

17 Kayu Mal (Bekisting) Rp. 1,700,000

18 Dolken btg Rp. 15,000

19 Tegel Keramik - Putih (20 x 20 cm) Dos Rp. 49,000

20 Tegel Keramik - Warna (40 x 40 cm) Dos Rp. 44,300

21 Tegel Keramik - Warna (20 x 25 cm) Dos Rp. 53,500

22 Tegel Keramik - Putih (30 x 30 cm) Dos Rp. 42,300

23 Paving Blok Balok bh Rp. 6,000

24 Paving Blok Persegi bh Rp. 6,000

25 Kaca Bening 3 mm Rp. 102,000

26 Kaca Bening 5 mm Rp. 133,200

27 Kaca Ryben 5 mm Rp. 156,000

28 Besi Beton Kg Rp. 12,000

29 Besi Siku L 30. 30. 3 Btg Rp. 45,500

30 Besi Siku L. 50. 50. 5 Btg Rp. 115,000

31 Paku Biasa Kg Rp. 20,000

32 Paku Tripleks Kg Rp. 22,800

33 Paku Seng - RRT Kg Rp. 35,000

34 Paku Beton doz Rp. 11,000

35 Kawat Beton (Bindstaal) Kg Rp. 15,000

36 Kawat Ayak - 90 cm M' Rp. 30,000

37 Kawat Duri/10 Kg Rool Rp. 192,000

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m2

m2

m2

Page 21: Latihan RAB

38 Pipa GIP (Medium B) D:3/4 Inch - 6 m Btg Rp. 195,000

39 Pipa GIP (Medium B) D:1,0 Inch - 6 m Btg Rp. 285,000

40 Pipa PVC (AW) D:0,5 Inch - 4 m Btg Rp. 15,500

41 Pipa PVC (AW) D:0,75 Inch - 4 m Btg Rp. 20,500

42 Pipa PVC (AW) D:2,0 Inch - 4 m Btg Rp. 55,500

43 Pipa PVC (AW) D:3,0 Inch - 4 m Btg Rp. 112,000

44 Pipa PVC (D) - Instalasi D:0,5 Inch - 4 m Btg Rp. 15,500

45 Pipa PVC (D) - Instalasi D:1,0 Inch - 4 m Btg Rp. 27,000

46 Tripleks 3 mm (122 x 244 cm) Lbr Rp. 51,000

47 Papan List Profil (3 x 3 cm - 4 m) Btg Rp. 11,500

48 Seng Gel. BWG (BJLS 0,22 mm) Kaki Rp. 7,300

49 Seng Plat BWG (BJLS 0,28 mm) Lbr Rp. 50,000

50 Genteng Metal Lbr Rp. 47,000

51 Kunci Tanam 1 x Putar (Biasa) Unit Rp. 24,000

52 Kunci Tanam 2 x Putar (Biasa) Unit Rp. 84,000

53 Huck Angin Kecil (Biasa) bh Rp. 9,600

54 Huck Angin Besar (Biasa) bh Rp. 14,400

55 Grendel Kecil (Biasa) bh Rp. 12,000

56 Grendel Besar (Biasa) bh Rp. 18,000

57 Engsel Pintu bh Rp. 12,000

58 Engsel Jendela bh Rp. 14,400

58 Closed Duduk (INA) bh Rp. 550,000

59 Closed Jongkok (INA) bh Rp. 150,000

60 Westafel bh Rp. 240,000

61 Stop Kran bh Rp. 18,000

62 Floor Drain bh Rp. 27,500

63 Cat Tembok - METROLITE kg Rp. 15,000 Rp. 75,000 /5kg

64 Cat Tembok - DULUX kg Rp. 50,000 Rp. 250,000 /5kg

65 Cat Kayu - Avian Kg Rp. 40,000

66 Cat Kayu - Yoko Kg Rp. 31,000

67 Cat Kayu Meni - Dasar Kg Rp. 13,000

68 Cat Besi - Gloteks Kg Rp. 48,000

68 Minyak cat Ltr Rp. 24,000

69 Cat Seng - AGA Kg Rp. 11,000 Rp. 55,000 /5kg

70 Cat Seng nippon paint Kg Rp. -

70 Lem Seng m Rp. 12,000

71 Plamour kg Rp. 10,800 Rp. 54,000 /5kg

72 Ampelas (Kertas Gosok) Lbr Rp. 2,400

73 Dempul Kayu Kg Rp. 18,000 Rp. 90,000 /5kg

74 Residu Ltr Rp. -

75 Kabel Listrik NYK 1,5 mm Rool Rp. 168,000

Page 22: Latihan RAB

76 Kabel Listrik NYK 2,5 mm Rool Rp. 300,000

77 Kabel Listrik NYK 2 x 1,5 mm Rool Rp. 198,000

78 Kabel Listrik NYK 2 x 2,5 mm Rool Rp. 318,000

79 Lampu TL - 1 x 20 Watt bh Rp. 38,500

80 Lampu TL - 2 x 10 Watt bh Rp. 33,500

81 Lampu TL - 1 x 40 Watt bh Rp. 37,500

82 Lampu TL - 2 x 40 Watt bh Rp. 75,500

83 Lampu Pijar - 18 Watt bh Rp. 32,000

84 Lampu Pijar - 5 Watt bh Rp. 12,000

85 Lampu Pijar - 40 Watt bh Rp. 24,000

86 Lampu Pijar - 100 Watt bh Rp. 18,000

87 Sakelar Phase Tunggal - Putih (BROCO) bh Rp. 18,000

88 Sakelar Phase Tunggal - Hitam (BROCO) bh Rp. 18,000

89 Sakelar Phase Double - Putih (BROCO) bh Rp. 19,000

90 Sakelar Phase Double - Hitam (BROCO) bh Rp. 19,000

91 Stop Kontak (Biasa) - Putih bh Rp. 16,000

92 Stop Kontak (Biasa) - Hitam bh Rp. 18,000

93 Box Sakering - Sakering Cast 1 Group bh Rp. 5,000

94 Box Sakering - Sakering Cast 2 Group bh Rp. 10,000

95 Box Sakering - Sakering Cast 3 Group bh Rp. 12,000

96 Fitting Tunggal bh Rp. 10,000

97 Fitting Ganda bh Rp. 22,000

98 Beugel U - 10 mm Unit Rp. -

99 Bout Baja - 35 cm Btg Rp. -

100 Bout Baja - 20 cm Btg Rp. -

101 Bout Baja - 15 cm Btg Rp. -

102 Besi Plat 1,2 mm (Polos) Lbr Rp. -

103 Besi Plat 3 mm (Polos) Lbr Rp. -

104 Besi Plat 2,3 mm (Kembang) Lbr Rp. -

0.00

0.00

0.00

0.000.00

Page 23: Latihan RAB

DAFTAR UPAH KERJA

NO TENAGA KERJA SATUAN HARGA (Rp.) KETERANGAN

1 Mandor Org/Hari 69,000.00

2 Kepala Tukang - Kayu Org/Hari 67,000.00

3 Kepala Tukang - Batu Org/Hari 67,000.00

4 Kepala Tukang - Besi Org/Hari 67,000.00

5 Kepala Tukang - Cat Org/Hari 67,000.00

6 Tukang - Kayu Org/Hari 55,500.00

7 Tukang - Batu Org/Hari 55,500.00

8 Tukang - Besi Org/Hari 55,500.00

9 Tukang - Cat Org/Hari 55,500.00

10 Pekerja Org/Hari 49,000.00

000

00

Page 24: Latihan RAB

P. Pondasi I 54.6 P. Pondasi s 134 67Pondasi 0.218 11.9028 Pondasi 0.38 50.92Bt. Kosong 0.108 5.8968 Bt. Kosong 0.127 17.02Galian 0.42 22.932 Galian 0.62 83.08

P. Pondasi II 16Pondasi 0.178 2.848Bt. Kosong 0.115 1.84Galian 0.445 7.12 Pas. Tembok 140.03 1.1 127.30

Plestr sisi pondasi 93.8 134P. Pondasi III 4Pondasi 0.544 2.176Bt. Kosong 0.294 1.176Galian 1.162 4.648

SLOEF 14/20 PAGAR SAMPINGP. Pondasi 134Bekisting 53.6

dimensi balok tulangan begelPembesian 0.14 0.2 536 0.62 332.32 893.3333Beton 3.752

KOLOM PAGAR SAMPING 17/15Tinggi 1.2Jumlah 44.66667Bekisting 18.224

dimensi tulangan begelPembesian 0.15 0.17 214.4 0.62 132.928 357.3333Beton 1.3668

RINGBALK PAGAR SAMPING 15/10P. Ringbalk 134Bekisting 32.16

dimensi balok tulangan begelPembesian 0.12 0.12 536 0.62 332.32 893.3333Beton 1.9296

SLOEF 14/20P. Pondasi 67.4Bekisting 26.96

dimensi balok tulangan begelPembesian 0.14 0.2 269.6 0.62 167.152 449.3333Beton 1.8872

Page 25: Latihan RAB

SLOEF 10/15P. Pondasi 13.76Bekisting 4.128

dimensi balok tulangan begelPembesian 0.1 0.15 55.04 0.62 34.1248 91.73333Beton 0.2064

KOLOM PAGAR DEPAN 14/14Tinggi 1.41 1.61Jumlah 16Bekisting

dimensi tulangan begelPembesian 0.18 0.18 103.04 0.62 63.8848 150.4Beton 0.442176

KOLOM PAGAR DEPAN 10/10 tinggi 2,35Tinggi 2.35Jumlah 8Bekisting 3.76

dimensi tulangan begelPembesian 0.1 0.1 75.2 0.62 46.624 125.3333Beton 0.188

KOLOM PAGAR DEPAN 10/10 tinggi 3,2Tinggi 3.2Jumlah 8Bekisting 5.12

dimensi tulangan begelPembesian 0.1 0.1 102.4 0.62 63.488 170.6667Beton 0.256

RINGBALK 10/240

Jumlah 54.6Bekisting 10.92

dimensi tulangan begelPembesian 0.1 0.24 218.4 0.62 135.408 364Beton 1.3104

RINGBALK 10/10TerasP. Pondasi 60.3Bekisting 18.09

Page 26: Latihan RAB

dimensi balok tulangan begelPembesian 0.12 0.15 241.2 0.62 149.544 402Beton 1.0854

Pas. Tembok

2.7 0.24 2.46 24.62.75 0.18 0.5273 0.7073 2.04272.75 0.6 2.15 4.19272.66.22

Pas. Tembok pilar25.2825.56834.816

114.4567

Page 27: Latihan RAB

#REF!

20065.4134.6

100 0.444.666667 6.700.7

begel kg/m kg total total0.1 0.16 0.52 464.533333333333 0.22 102.20 434.52

begel kg/m kg total total0.110 0.130 0.48 171.52 0.22 37.73 170.66

begel kg/m kg total total0.08 0.08 0.32 285.866666666667 0.22 62.89 395.21

begel kg/m kg total total0.1 0.16 0.52 233.653333333333 0.22 51.40 218.56

Page 28: Latihan RAB

begel kg/m kg total total0.06 0.11 0.34 31.1893333333333 0.22 6.86 40.99

begel kg/m kg total total0.140 0.140 0.56 84.224 0.22 18.53 82.41

begel kg/m kg total total0.060 0.060 0.24 30.08 0.22 6.62 53.24

begel kg/m kg total total0.060 0.060 0.24 40.96 0.22 9.01 72.50

begel kg/m kg total total0.060 0.200 0.52 189.28 0.22 41.64 177.05

Page 29: Latihan RAB

begel kg/m kg total total0.08 0.11 0.38 152.76 0.22 33.61 183.15

Page 30: Latihan RAB

ANALISA HARGA SATUAN PEKERJAAN

1. PEKERJAAN PERSIAPAN

1.1 1M' Pagar Sementara Dari Seng Gelombang Tinggi 2M

Bahan :

1.250 Btg Rp. 11,000.00 Rp. 13,750.00

2.500 Kg Semen Portland Rp. 880.00 Rp. 2,200.00

1.200 Lbr Seng Gelombang 3"-5" Rp. 22,500.00 Rp. 27,000.00

0.005 M3 Pasir Beton Rp. 85,000.00 Rp. 425.00

0.009 M3 Koral Beton Rp. 215,500.00 Rp. 1,939.50

0.072 M3 Kayu Klas II (Balok) Rp. 2,800,000.00 Rp. 201,600.00

0.060 Kg Paku Biasa Rp. 9,500.00 Rp. 570.00

0.450 Kg Meni Besi Rp. 9,000.00 Rp. 4,050.00

Upah :

0.200 Oh Tukang Kayu Rp. 45,000.00 Rp. 9,000.00

0.400 Oh Pekerja Rp. 35,000.00 Rp. 14,000.00

0.020 Oh Kepala Tukang Rp. 55,000.00 Rp. 1,100.00

0.020 Oh Mandor Rp. 50,000.00 Rp. 1,000.00

1.2 1 M' Pengukuran Dan Pemasangan Bouplank

0.012 M3 Kayu Klas II (Balok) Rp. 2,800,000.00 Rp. 33,600.00

0.020 Kg Paku Biasa 2"-5" Rp. 9,500.00 Rp. 190.00

0.007 M3 Kayu Klas II (Papan) Rp. 2,800,000.00 Rp. 19,600.00

0.100 Oh Tukang Kayu Rp. 45,000.00 Rp. 4,500.00

0.100 Oh Pekerja Rp. 35,000.00 Rp. 3,500.00

0.010 Oh Kepala Tukang Rp. 55,000.00 Rp. 550.00

0.005 Oh Mandor Rp. 50,000.00 Rp. 250.00

1.3 1M2 Pembuatan Kantor Sementara, Dengan Lantai Plesteran

Bahan :

1.250 Btg Rp. 11,000.00 Rp. 13,750.00

0.180 M3 Kayu Klas II (Balok) Rp. 2,800,000.00 Rp. 504,000.00

0.850 Kg Paku Biasa Rp. 9,500.00 Rp. 8,075.00

1.100 Kg Besi Strip Rp. 23,000.00 Rp. 25,300.00

35.000 Kg Semen PC Rp. 880.00 Rp. 30,800.00

0.150 M3 Pasir Pasangan Rp. 85,000.00 Rp. 12,750.00

0.100 M3 Pasir Beton Rp. 85,000.00 Rp. 8,500.00

0.150 M3 Koral Beton Rp. 215,500.00 Rp. 32,325.00

30.000 Bh Bata Merah Rp. 400.00 Rp. 12,000.00

0.250 Lbr Seng Plat Rp. 31,050.00 Rp. 7,762.50

2.000 Bh Jendela Naco Rp. 60,000.00 Rp. 120,000.00

0.080 M2 Kaca Polos Rp. 74,750.00 Rp. 5,980.00

0.150 Bh Kunci Tanam Rp. 45,000.00 Rp. 6,750.00

0.060 Lbr Polywood 4 mm Rp. 51,750.00 Rp. 3,105.00

Dolken Kayu Ø 8-10

Dolken Kayu Ø 8-10

Page 31: Latihan RAB

Upah :

2.000 Oh Tukang Kayu Rp. 45,000.00 Rp. 90,000.00

1.000 Oh Tukang Batu Rp. 45,000.00 Rp. 45,000.00

2.000 Oh Pekerja Rp. 35,000.00 Rp. 70,000.00

0.300 Oh Kepala Tukang Rp. 55,000.00 Rp. 16,500.00

0.050 Oh Mandor Rp. 50,000.00 Rp. 2,500.00

1.4 1M2 Pembuatan Gudang Semen Dan Alat-Alat

Bahan :

1.700 Btg Rp. 11,000.00 Rp. 18,700.00

0.210 M3 Kayu Klas II (Balok) Rp. 2,800,000.00 Rp. 588,000.00

0.300 Kg Paku Biasa Rp. 9,500.00 Rp. 2,850.00

10.500 Kg Semen PC Rp. 880.00 Rp. 9,240.00

0.030 M3 Pasir Beton Rp. 85,000.00 Rp. 2,550.00

0.050 M3 Koral Beton Rp. 215,500.00 Rp. 10,775.00

1.500 M3 Seng Gelombang bjl 32 Rp. 22,500.00 Rp. 33,750.00

Upah :

2.000 Oh Tukang Kayu Rp. 45,000.00 Rp. 90,000.00

1.000 Oh Pekerja Rp. 35,000.00 Rp. 35,000.00

0.200 Oh Kepala Tukang Rp. 55,000.00 Rp. 11,000.00

0.050 Oh Mandor Rp. 50,000.00 Rp. 2,500.00

1.5 1M2 Pembersihan Lapangan Dan Peralatan

0.100 Oh Pekerja Rp. 35,000.00 Rp. 3,500.00

0.050 Oh Mandor Rp. 50,000.00 Rp. 2,500.00

1.6 1M3 Bongkaran Beton Bertulang

1.000 Oh Pekerja Rp. 35,000.00 Rp. 35,000.00

0.050 Oh Mandor Rp. 50,000.00 Rp. 2,500.00

1.7 1M3 Bongkaran Dinding Tembok Bata Merah

6.667 Oh Pekerja Rp. 35,000.00 Rp. 233,345.00

0.033 Oh Mandor Rp. 50,000.00 Rp. 1,650.00

2. PEKERJAAN TANAH

2.1 1M3 Galian Tanah Biasa Sedalam 1 Meter

0.400 Oh Pekerja Rp. 35,000.00 Rp. 14,000.00

Dolken Kayu Ø 8-10

Page 32: Latihan RAB

0.040 Oh Mandor Rp. 50,000.00 Rp. 2,000.00

2.2 1M3 Galian Tanah Biasa Sedalam 2 Meter

0.526 Oh Pekerja Rp. 35,000.00 Rp. 18,410.00

0.052 Oh Mandor Rp. 50,000.00 Rp. 2,600.00

2.3 1M3 Galian Tanah Biasa Sedalam 3 Meter

0.735 Oh Pekerja Rp. 35,000.00 Rp. 25,725.00

0.073 Oh Mandor Rp. 50,000.00 Rp. 3,650.00

2.4 1M3 Urugan Tanah Kembali

0.192 Oh Pekerja Rp. 35,000.00 Rp. 6,720.00

0.019 Oh Mandor Rp. 50,000.00 Rp. 950.00

2.5 1M3 Pemadatan Tanah

0.500 Oh Pekerja Rp. 35,000.00 Rp. 17,500.00

0.050 Oh Mandor Rp. 50,000.00 Rp. 2,500.00

2.6 1M3 Urugan Pasir

1.200 M3 Pasir Timbunan Rp. 71,500.00 Rp. 85,800.00

0.300 Oh Pekerja Rp. 35,000.00 Rp. 10,500.00

0.010 Oh Mandor Rp. 50,000.00 Rp. 500.00

2.7 1M3 Urugan Sirtu

1.200 M3 Sirtu Rp. 75,000.00 Rp. 90,000.00

0.250 Oh Pekerja Rp. 35,000.00 Rp. 8,750.00

0.025 Oh Mandor Rp. 50,000.00 Rp. 1,250.00

3. PEKERJAAN PONDASI

3.1 1M3 Pasangan Batu Kali 1 : 2

1.100 M3 Batu Gunung Rp. 103,500.00 Rp. 113,850.00

392.000 Kg Semen PC Rp. 880.00 Rp. 344,960.00

0.427 M3 Pasir Pasangan Rp. 85,000.00 Rp. 36,295.00

0.150 Pekerja Rp. 35,000.00 Rp. 5,250.00

0.600 Tukang Batu Rp. 45,000.00 Rp. 27,000.00

0.060 Kepala Tk. Batu Rp. 55,000.00 Rp. 3,300.00

0.075 Mandor Rp. 50,000.00 Rp. 3,750.00

Page 33: Latihan RAB

3.2 1M3 Pasangan Batu Kali 1 : 3

1.100 M3 Batu Gunung Rp. 103,500.00 Rp. 113,850.00

202.000 Kg Semen PC Rp. 880.00 Rp. 177,760.00

0.485 M3 Pasir Pasangan Rp. 85,000.00 Rp. 41,225.00

0.150 Pekerja Rp. 35,000.00 Rp. 5,250.00

0.600 Tukang Batu Rp. 45,000.00 Rp. 27,000.00

0.060 Kepala Tk. Batu Rp. 55,000.00 Rp. 3,300.00

0.075 Mandor Rp. 50,000.00 Rp. 3,750.00

3.3 1M3 Pasangan Batu Kosong

1.200 M3 Batu Gunung Rp. 103,500.00 Rp. 124,200.00

0.300 M3 Pasir Urug Rp. 71,500.00 Rp. 21,450.00

0.780 Oh Pekerja Rp. 35,000.00 Rp. 27,300.00

0.390 Oh Tukang Batu Rp. 45,000.00 Rp. 17,550.00

0.039 Oh Kepala Tukang Rp. 55,000.00 Rp. 2,145.00

0.250 Oh Mandor Rp. 50,000.00 Rp. 12,500.00

3.4

0.450 M3 Batu Belah 15/20 cm Rp. 215,500.00 Rp. 96,975.00

280.000 Kg Semen Portland Rp. 880.00 Rp. 246,400.00

0.450 M3 Pasir Beton Rp. 85,000.00 Rp. 38,250.00

0.670 M3 Koral Beton Rp. 215,500.00 Rp. 144,385.00

2.380 Oh Pekerja Rp. 35,000.00 Rp. 83,300.00

0.300 Oh Tukang Batu Rp. 45,000.00 Rp. 13,500.00

0.030 Oh Kepala Tukang Rp. 55,000.00 Rp. 1,650.00

0.030 Oh Mandor Rp. 50,000.00 Rp. 1,500.00

4. PEKERJAAN DINDING

BATA UKURAN 5 x 11 x 22 cm

4.1 1M2 Batu Bata Tebal 1 Bata 1 : 2

Bahan :

140.000 Bh Batu Merah Rp. 400.00 Rp. 56,000.00

43.500 Kg Semen Pc Rp. 880.00 Rp. 38,280.00

0.080 M3 Pasir Pasangan Rp. 85,000.00 Rp. 6,800.00

Upah :

0.650 Oh Pekerja Rp. 35,000.00 Rp. 22,750.00

0.200 Oh Tukang Batu Rp. 45,000.00 Rp. 9,000.00

0.020 Oh Kepala Tukang Rp. 55,000.00 Rp. 1,100.00

0.030 Oh Mandor Rp. 50,000.00 Rp. 1,500.00

4.2 1M2 Batu Bata Tebal 1 Bata 1 : 4

Bahan :

1M3 Pasangan Pondasi Sumuran Ø 100CM

Page 34: Latihan RAB

140.000 Bh Batu Merah Rp. 400.00 Rp. 56,000.00

26.550 Kg Semen Pc Rp. 880.00 Rp. 23,364.00

0.093 M3 Pasir Pasangan Rp. 85,000.00 Rp. 7,905.00

Upah :

0.650 Oh Pekerja Rp. 35,000.00 Rp. 22,750.00

0.200 Oh Tukang Batu Rp. 45,000.00 Rp. 9,000.00

0.020 Oh Kepala Tukang Rp. 55,000.00 Rp. 1,100.00

0.030 Oh Mandor Rp. 50,000.00 Rp. 1,500.00

4.3

Bahan :

70.000 Bh Batu Merah Rp. 400.00 Rp. 28,000.00

18.950 Kg Semen Pc Rp. 880.00 Rp. 16,676.00

0.038 M3 Pasir Pasangan Rp. 85,000.00 Rp. 3,230.00

Upah :

0.320 Oh Pekerja Rp. 35,000.00 Rp. 11,200.00

0.100 Oh Tukang Batu Rp. 45,000.00 Rp. 4,500.00

0.010 Oh Kepala Tukang Rp. 55,000.00 Rp. 550.00

0.015 Oh Mandor Rp. 50,000.00 Rp. 750.00

4.4

Bahan :

70.000 Bh Batu Merah Rp. 400.00 Rp. 28,000.00

11.500 Kg Semen Pc Rp. 880.00 Rp. 10,120.00

0.043 M3 Pasir Pasangan Rp. 85,000.00 Rp. 3,655.00

Upah :

0.320 Oh Pekerja Rp. 35,000.00 Rp. 11,200.00

0.100 Oh Tukang Batu Rp. 45,000.00 Rp. 4,500.00

0.010 Oh Kepala Tukang Rp. 55,000.00 Rp. 550.00

0.015 Oh Mandor Rp. 50,000.00 Rp. 750.00

4.5

Bahan :

70.000 Bh Batu Merah Rp. 400.00 Rp. 28,000.00

9.680 Kg Semen Pc Rp. 880.00 Rp. 8,518.40

0.043 M3 Pasir Pasangan Rp. 85,000.00 Rp. 3,655.00

Upah :

0.320 Oh Pekerja Rp. 35,000.00 Rp. 11,200.00

1M2 Pasangan Bata Tebal 1/2 Bata 1 : 2

1M2 Pasangan Bata Tebal 1/2 Bata 1 : 4

1M2 Pasangan Bata Tebal 1/2 Bata 1 : 5

Page 35: Latihan RAB

0.100 Oh Tukang Batu Rp. 45,000.00 Rp. 4,500.00

0.010 Oh Kepala Tukang Rp. 55,000.00 Rp. 550.00

0.015 Oh Mandor Rp. 50,000.00 Rp. 750.00

5. PEKERJAAN PLESTERAN

5.1 1 M2 Plesteran 1:2 Tebal 15 mm

Bahan :

8.500 Kg Semen PC Rp. 880.00 Rp. 7,480.00

0.017 M3 Pasir Pasang Rp. 85,000.00 Rp. 1,445.00

Upah :

0.200 Oh Pekerja Rp. 35,000.00 Rp. 7,000.00

0.150 Oh Tukang Batu Rp. 45,000.00 Rp. 6,750.00

0.015 Oh Kepala Tukang Rp. 55,000.00 Rp. 825.00

0.010 Oh Mandor Rp. 50,000.00 Rp. 500.00

5.2 1 M2 Plesteran 1:4 Tebal 15 mm

Bahan :

5.200 Kg Semen PC Rp. 880.00 Rp. 4,576.00

0.020 M3 Pasir Pasang Rp. 85,000.00 Rp. 1,700.00

Upah :

0.200 Oh Pekerja Rp. 35,000.00 Rp. 7,000.00

0.150 Oh Tukang Batu Rp. 45,000.00 Rp. 6,750.00

0.015 Oh Kepala Tukang Rp. 55,000.00 Rp. 825.00

0.010 Oh Mandor Rp. 50,000.00 Rp. 500.00

5.3 1 M2 Plesteran 1:5 Tebal 15 mm

Bahan :

4.320 Kg Semen PC Rp. 880.00 Rp. 3,801.60

0.022 M3 Pasir Pasang Rp. 85,000.00 Rp. 1,870.00

Upah :

0.200 Oh Pekerja Rp. 35,000.00 Rp. 7,000.00

0.150 Oh Tukang Batu Rp. 45,000.00 Rp. 6,750.00

0.015 Oh Kepala Tukang Rp. 55,000.00 Rp. 825.00

0.010 Oh Mandor Rp. 50,000.00 Rp. 500.00

Page 36: Latihan RAB

5.4 1 M2 Plesteran Beton 1 : 2 Tebal 15 MM

Bahan :

9.300 Kg Semen PC Rp. 880.00 Rp. 8,184.00

0.018 M3 Pasir Pasang Rp. 85,000.00 Rp. 1,530.00

Upah :

0.260 Oh Pekerja Rp. 35,000.00 Rp. 9,100.00

0.200 Oh Tukang Batu Rp. 45,000.00 Rp. 9,000.00

0.020 Oh Kepala Tukang Rp. 55,000.00 Rp. 1,100.00

0.013 Oh Mandor Rp. 50,000.00 Rp. 650.00

5.5 1 M2 Plesteran Beton 1 : 3 Tebal 15 MM

Bahan :

7.070 Kg Semen PC Rp. 880.00 Rp. 6,221.60

0.021 M3 Pasir Pasang Rp. 85,000.00 Rp. 1,785.00

Upah :

0.260 Oh Pekerja Rp. 35,000.00 Rp. 9,100.00

0.200 Oh Tukang Batu Rp. 45,000.00 Rp. 9,000.00

0.020 Oh Kepala Tukang Rp. 55,000.00 Rp. 1,100.00

0.013 Oh Mandor Rp. 50,000.00 Rp. 650.00

5.6 1 M2 Plesteran Waterproof Batacote 3 Lapis

Bahan :

0.500 Kg Semen PC Rp. 880.00 Rp. 440.00

2.900 Kg Batacote Rp. 36,600.00 Rp. 106,140.00

0.006 M3 Pasir Pasangan Rp. 85,000.00 Rp. 510.00

Upah :

0.300 Oh Pekerja Rp. 35,000.00 Rp. 10,500.00

0.200 Oh Tukang Batu Rp. 45,000.00 Rp. 9,000.00

0.020 Oh Kepala Tukang Rp. 55,000.00 Rp. 1,100.00

0.015 Oh Mandor Rp. 50,000.00 Rp. 750.00

5.7 10 M2 Acian Tembok

Bahan :

0.083 Zak Semen PC Rp. 880.00 Rp. 73.04

0.021 M3 Kapur Pasangan Rp. 83,000.00 Rp. 1,743.00

Upah :

Page 37: Latihan RAB

1.000 Pekerja Rp. 35,000.00 Rp. 35,000.00

0.100 Mandor Rp. 45,000.00 Rp. 4,500.00

1.000 Tukang Batu Rp. 55,000.00 Rp. 55,000.00

0.100 Kepala Tukang Rp. 50,000.00 Rp. 5,000.00

Untuk 1 m2

6. PEKERJAAN KAYU

6.1 1 M3 Pasang Kuseng Pintu Dan Jendela Kayu Kls I

Bahan :

1.100 M3 Kayu Kelas I (Balok) Rp. 5,000,000.00 Rp. 5,500,000.00

Upah :

6.000 Oh Pekerja Rp. 35,000.00 Rp. 210,000.00

20.000 Oh Tukang Kayu Rp. 45,000.00 Rp. 900,000.00

2.000 Oh Kepala Tukang Rp. 55,000.00 Rp. 110,000.00

0.300 Oh Mandor Rp. 50,000.00 Rp. 15,000.00

6.2 1 M2 Pasang Pintu Panel Kayu Kls I

Bahan :

0.040 M3 Kayu Kelas I (Papan) Rp. 5,250,000.00 Rp. 210,000.00

Upah :

1.000 Oh Pekerja Rp. 35,000.00 Rp. 35,000.00

2.500 Oh Tukang Kayu Rp. 45,000.00 Rp. 112,500.00

0.250 Oh Kepala Tukang Rp. 55,000.00 Rp. 13,750.00

0.050 Oh Mandor Rp. 50,000.00 Rp. 2,500.00

6.3 1 M2 Pasang Pintu Dan Jendela Kaca Kayu Kls I

Bahan :

0.035 M3 Kayu Kelas I (Papan) Rp. 5,250,000.00 Rp. 183,750.00

Upah :

0.800 Oh Pekerja Rp. 35,000.00 Rp. 28,000.00

2.000 Oh Tukang Kayu Rp. 45,000.00 Rp. 90,000.00

0.200 Oh Kepala Tukang Rp. 55,000.00 Rp. 11,000.00

0.040 Oh Mandor Rp. 50,000.00 Rp. 2,000.00

Page 38: Latihan RAB

6.4 1 M2 Pasang Pintu Dan Jendela Jalusi Kayu Kls I

Bahan :

0.064 M3 Kayu Kelas I (Papan) Rp. 5,250,000.00 Rp. 336,000.00

Upah :

1.000 Oh Pekerja Rp. 35,000.00 Rp. 35,000.00

3.000 Oh Tukang Kayu Rp. 45,000.00 Rp. 135,000.00

0.300 Oh Kepala Tukang Rp. 55,000.00 Rp. 16,500.00

0.300 Oh Mandor Rp. 50,000.00 Rp. 15,000.00

6.5 1 M3 Pasang Konstruksi Kuda-Kuda Kayu Klas I

Bahan :

1.100 M3 Kayu Kelas I (Balok) Rp. 5,000,000.00 Rp. 5,500,000.00

15.000 Kg Besi Strip Rp. 23,000.00 Rp. 345,000.00

0.800 Kg Paku Biasa 2"-5" Rp. 9,500.00 Rp. 7,600.00

Upah :

4.000 Oh Pekerja Rp. 35,000.00 Rp. 140,000.00

12.000 Oh Tukang Kayu Rp. 45,000.00 Rp. 540,000.00

1.200 Oh Kepala Tukang Rp. 55,000.00 Rp. 66,000.00

0.200 Oh Mandor Rp. 50,000.00 Rp. 10,000.00

6.6 1 M2 Pasang Kaso + Reng Genteng Keramik Kayu Klas I

Bahan :

0.014 M3 Kayu Kelas I (Balok) Rp. 5,000,000.00 Rp. 70,000.00

0.150 Kg Paku Biasa 2"-5" Rp. 9,500.00 Rp. 1,425.00

Upah :

0.100 Oh Pekerja Rp. 35,000.00 Rp. 3,500.00

0.100 Oh Tukang Kayu Rp. 45,000.00 Rp. 4,500.00

0.010 Oh Kepala Tukang Rp. 55,000.00 Rp. 550.00

0.005 Oh Mandor Rp. 50,000.00 Rp. 250.00

6.7 1 M2 Pasang Kaso + Reng Genteng Keramik Kayu Klas II

Page 39: Latihan RAB

Bahan :

0.014 M3 Kayu Kelas II (Balok) Rp. 2,800,000.00 Rp. 39,200.00

0.150 Kg Paku Biasa 2"-5" Rp. 9,500.00 Rp. 1,425.00

Upah :

0.100 Oh Pekerja Rp. 35,000.00 Rp. 3,500.00

0.100 Oh Tukang Kayu Rp. 45,000.00 Rp. 4,500.00

0.010 Oh Kepala Tukang Rp. 55,000.00 Rp. 550.00

0.005 Oh Mandor Rp. 50,000.00 Rp. 250.00

6.8 1 M2 Pasang Talang Miring , Seng BJLS 28

Bahan :

0.500 Lbr Seng Plat 3' x 6' bjls 28 Rp. 31,050.00 Rp. 15,525.00

0.015 Kg Paku Biasa 1/2" - 1" Rp. 9,500.00 Rp. 142.50

0.015 M3 Kayu Klas II (Papan) Rp. 2,800,000.00 Rp. 42,000.00

0.015 Kg Flincote / Meni Besi Rp. 20,000.00 Rp. 300.00

Upah :

0.040 Oh Pekerja Rp. 35,000.00 Rp. 1,400.00

0.400 Oh Tukang Kayu Rp. 45,000.00 Rp. 18,000.00

0.025 Oh Kepala Tukang Rp. 55,000.00 Rp. 1,375.00

0.001 Oh Mandor Rp. 50,000.00 Rp. 65.00

6.9 1M2 Pasang Rangka Langit-Langit (1x1M), Kayu Klas I

Bahan :

0.012 M3 Kayu Kelas I (Balok) Rp. 5,000,000.00 Rp. 60,000.00

0.100 Kg Paku Biasa 2"-5" Rp. 9,500.00 Rp. 950.00

Upah :

0.150 Oh Pekerja Rp. 35,000.00 Rp. 5,250.00

0.250 Oh Tukang Kayu Rp. 45,000.00 Rp. 11,250.00

0.025 Oh Kepala Tukang Rp. 55,000.00 Rp. 1,375.00

0.075 Oh Mandor Rp. 50,000.00 Rp. 3,750.00

6.10 1M2 Pasang Rangka Langit-Langit (1x1M), Kayu Klas II

Bahan :

0.012 M3 Kayu Kelas II (Balok) Rp. 2,800,000.00 Rp. 33,600.00

0.100 Kg Paku Biasa 2"-5" Rp. 9,500.00 Rp. 950.00

Page 40: Latihan RAB

Upah :

0.150 Oh Pekerja Rp. 35,000.00 Rp. 5,250.00

0.250 Oh Tukang Kayu Rp. 45,000.00 Rp. 11,250.00

0.025 Oh Kepala Tukang Rp. 55,000.00 Rp. 1,375.00

0.075 Oh Mandor Rp. 50,000.00 Rp. 3,750.00

6.11 1 M' Pasang Lisplang Ukuran (3x30)cm, Kayu Kelas I

Bahan :

0.011 M3 Kayu Kelas I (Papan) Rp. 5,250,000.00 Rp. 57,750.00

0.050 Kg Paku Biasa 2"-5" Rp. 9,500.00 Rp. 475.00

Upah :

0.110 Oh Pekerja Rp. 35,000.00 Rp. 3,850.00

0.220 Oh Tukang Kayu Rp. 45,000.00 Rp. 9,900.00

0.022 Oh Kepala Tukang Rp. 55,000.00 Rp. 1,210.00

0.005 Oh Mandor Rp. 50,000.00 Rp. 250.00

6.12 1 M' Pasang Lisplang Ukuran 2x(2x30)cm, Kayu Kelas I

Bahan :

0.0145 M3 Kayu Kelas I (Papan) Rp. 5,250,000.00 Rp. 76,125.00

0.060 Kg Paku Biasa 2"-5" Rp. 9,500.00 Rp. 570.00

Upah :

0.150 Oh Pekerja Rp. 35,000.00 Rp. 5,250.00

0.250 Oh Tukang Kayu Rp. 45,000.00 Rp. 11,250.00

0.025 Oh Kepala Tukang Rp. 55,000.00 Rp. 1,375.00

0.075 Oh Mandor Rp. 50,000.00 Rp. 3,750.00

6.12 1 M2 Pasang Rangka Dinding Pemisah Kayu Klas II

Bahan :

0.0195 M3 Kayu Kelas II (Balok) Rp. 2,800,000.00 Rp. 54,600.00

0.007 M3 Kayu Kelas II (Papan) Rp. 2,800,000.00 Rp. 19,600.00

0.100 Kg Paku Biasa 2"-5" Rp. 9,500.00 Rp. 950.00

Upah :

0.150 Oh Pekerja Rp. 35,000.00 Rp. 5,250.00

0.450 Oh Tukang Kayu Rp. 45,000.00 Rp. 20,250.00

0.045 Oh Kepala Tukang Rp. 55,000.00 Rp. 2,475.00

Page 41: Latihan RAB

0.075 Oh Mandor Rp. 50,000.00 Rp. 3,750.00

6.13 1 M2 Pasang Polywood tebal 4 mm, Untuk Dinding

Bahan :

0.4000 Lbr Polywood 9 mm Rp. - Rp. -

0.050 Kg Paku Biasa 1/2"-1" Rp. 9,500.00 Rp. 475.00

Upah :

0.025 Oh Pekerja Rp. 35,000.00 Rp. 875.00

0.075 Oh Tukang Kayu Rp. 45,000.00 Rp. 3,375.00

0.0075 Oh Kepala Tukang Rp. 55,000.00 Rp. 412.50

0.0013 Oh Mandor Rp. 50,000.00 Rp. 65.00

6.13 1 M' Pasang List Plafond - Kayu Profil

Bahan :

1.050 M' Kayu Profil Rp. 4,250.00 Rp. 4,462.50

0.050 Kg Paku Rp. 9,500.00 Rp. 475.00

Upah :

0.021 Oh Pekerja Rp. 35,000.00 Rp. 735.00

0.021 Oh Tukang Kayu Rp. 45,000.00 Rp. 945.00

0.0020 Oh Kepala Tukang Rp. 55,000.00 Rp. 110.00

0.0010 Oh Mandor Rp. 50,000.00 Rp. 50.00

7. PEKERJAAN BETON

7.1 1 M3 Membuat Beton Tumbuk 1Pc - 3Ps - 5Kr

Bahan :

218.000 Kg Semen Portland Rp. 880.00 Rp. 191,840.00

0.520 M3 Pasir Beton Rp. 85,000.00 Rp. 44,200.00

0.870 M3 Koral Beton / Split Rp. 215,500.00 Rp. 187,485.00

Upah :

1.650 Oh Pekerja Rp. 35,000.00 Rp. 57,750.00

0.250 Oh Tukang Batu Rp. 45,000.00 Rp. 11,250.00

0.025 Oh Kepala Tukang Rp. 55,000.00 Rp. 1,375.00

0.080 Oh Mandor Rp. 50,000.00 Rp. 4,000.00

Page 42: Latihan RAB

7.2 1 M3 Membuat Beton Tumbuk 1Pc - 3Ps - 6Kr

Bahan :

197.000 Kg Semen Portland Rp. 880.00 Rp. 173,360.00

0.470 M3 Pasir Beton Rp. 85,000.00 Rp. 39,950.00

0.940 M3 Koral Beton / Split Rp. 215,500.00 Rp. 202,570.00

Upah :

1.650 Oh Pekerja Rp. 35,000.00 Rp. 57,750.00

0.250 Oh Tukang Batu Rp. 45,000.00 Rp. 11,250.00

0.025 Oh Kepala Tukang Rp. 55,000.00 Rp. 1,375.00

0.080 Oh Mandor Rp. 50,000.00 Rp. 4,000.00

7.3 1 M3 Membuat Lantai Kerja Beton Tumbuk, 1Pc - 3Ps - 5Kr Tebal 5cm

Bahan :

10.000 Kg Semen Portland Rp. 880.00 Rp. 8,800.00

0.026 M3 Pasir Beton Rp. 85,000.00 Rp. 2,210.00

0.044 M3 Koral Beton / Split Rp. 215,500.00 Rp. 9,482.00

Upah :

1.150 Oh Pekerja Rp. 35,000.00 Rp. 40,250.00

0.020 Oh Tukang Batu Rp. 45,000.00 Rp. 900.00

0.002 Oh Kepala Tukang Rp. 55,000.00 Rp. 110.00

0.006 Oh Mandor Rp. 50,000.00 Rp. 300.00

7.4 1 M2 Pasang Bekisting Untuk Pondasi

Bahan :

0.040 M3 Kayu Klas III Rp. 1,000,000.00 Rp. 40,000.00

0.300 Kg Paku Biasa Rp. 9,500.00 Rp. 2,850.00

0.100 Ltr Minyak Bekisting Rp. 7,800.00 Rp. 780.00

Upah :

0.300 Oh Pekerja Rp. 35,000.00 Rp. 10,500.00

0.260 Oh Tukang Kayu Rp. 45,000.00 Rp. 11,700.00

0.026 Oh Kepala Tukang Rp. 55,000.00 Rp. 1,430.00

0.005 Oh Mandor Rp. 50,000.00 Rp. 250.00

7.5 1 M2 Pasang Bekisting Untuk Sloof

Bahan :

0.045 M3 Kayu Klas III Rp. 1,000,000.00 Rp. 45,000.00

0.300 Kg Paku Biasa Rp. 9,500.00 Rp. 2,850.00

0.100 Ltr Minyak Bekisting Rp. 7,800.00 Rp. 780.00

Upah :

Page 43: Latihan RAB

0.300 Oh Pekerja Rp. 35,000.00 Rp. 10,500.00

0.260 Oh Tukang Kayu Rp. 45,000.00 Rp. 11,700.00

0.026 Oh Kepala Tukang Rp. 55,000.00 Rp. 1,430.00

0.005 Oh Mandor Rp. 50,000.00 Rp. 250.00

7.6 1 M2 Pasang Bekisting Untuk Kolom

Bahan :

0.040 M3 Kayu Klas III Rp. 1,000,000.00 Rp. 40,000.00

0.400 Kg Paku Biasa Rp. 9,500.00 Rp. 3,800.00

0.200 Ltr Minyak Bekisting Rp. 7,800.00 Rp. 1,560.00

0.015 M3 Kayu Klas II (Balok) Rp. 2,800,000.00 Rp. 42,000.00

0.350 Lbr Multipleks 6mm Rp. 66,700.00 Rp. 23,345.00

2.000 Btg Rp. 11,000.00 Rp. 22,000.00

Upah :

0.300 Oh Pekerja Rp. 35,000.00 Rp. 10,500.00

0.330 Oh Tukang Kayu Rp. 45,000.00 Rp. 14,850.00

0.033 Oh Kepala Tukang Rp. 55,000.00 Rp. 1,815.00

0.006 Oh Mandor Rp. 50,000.00 Rp. 300.00

7.7 1 M2 Pasang Bekisting Untuk Balok

Bahan :

0.040 M3 Kayu Klas III Rp. 1,000,000.00 Rp. 40,000.00

0.400 Kg Paku Biasa Rp. 9,500.00 Rp. 3,800.00

0.200 Ltr Minyak Bekisting Rp. 7,800.00 Rp. 1,560.00

0.018 M3 Kayu Klas II (Balok) Rp. 2,800,000.00 Rp. 50,400.00

0.350 Lbr Multipleks 6mm Rp. 66,700.00 Rp. 23,345.00

2.000 Btg Rp. 11,000.00 Rp. 22,000.00

Upah :

0.320 Oh Pekerja Rp. 35,000.00 Rp. 11,200.00

0.330 Oh Tukang Kayu Rp. 45,000.00 Rp. 14,850.00

0.033 Oh Kepala Tukang Rp. 55,000.00 Rp. 1,815.00

0.006 Oh Mandor Rp. 50,000.00 Rp. 300.00

7.8 1 M2 Pasang Bekisting Untuk Lantai

Dolken Kayu Galam Ø8-10

Dolken Kayu Galam Ø8-10

Page 44: Latihan RAB

Bahan :

0.040 M3 Kayu Klas III Rp. 1,000,000.00 Rp. 40,000.00

0.400 Kg Paku Biasa Rp. 9,500.00 Rp. 3,800.00

0.200 Ltr Minyak Bekisting Rp. 7,800.00 Rp. 1,560.00

0.015 M3 Kayu Klas II (Balok) Rp. 2,800,000.00 Rp. 42,000.00

0.350 Lbr Multipleks 6mm Rp. 66,700.00 Rp. 23,345.00

6.000 Btg Rp. 11,000.00 Rp. 66,000.00

Upah :

0.320 Oh Pekerja Rp. 35,000.00 Rp. 11,200.00

0.330 Oh Tukang Kayu Rp. 45,000.00 Rp. 14,850.00

0.033 Oh Kepala Tukang Rp. 55,000.00 Rp. 1,815.00

0.006 Oh Mandor Rp. 50,000.00 Rp. 300.00

7.9 1 M2 Pasang Bekisting Untuk Dinding

Bahan :

0.030 M3 Kayu Klas III Rp. 1,000,000.00 Rp. 30,000.00

0.400 Kg Paku Biasa Rp. 9,500.00 Rp. 3,800.00

0.200 Ltr Minyak Bekisting Rp. 7,800.00 Rp. 1,560.00

0.020 M3 Kayu Klas II (Balok) Rp. 2,800,000.00 Rp. 56,000.00

0.350 Lbr Multipleks 6mm Rp. 66,700.00 Rp. 23,345.00

3.000 Lbr Rp. 11,000.00 Rp. 33,000.00

4.000 Btg Penjaga Jarak Bekisting Rp. 11,500.00 Rp. 46,000.00

Upah :

0.320 Oh Pekerja Rp. 35,000.00 Rp. 11,200.00

0.330 Oh Tukang Kayu Rp. 45,000.00 Rp. 14,850.00

0.033 Oh Kepala Tukang Rp. 55,000.00 Rp. 1,815.00

0.006 Oh Mandor Rp. 50,000.00 Rp. 300.00

7.10 1 M2 Pasang Bekisting Untuk Tangga

Bahan :

0.030 M3 Kayu Klas III Rp. 1,000,000.00 Rp. 30,000.00

0.400 Kg Paku Biasa Rp. 9,500.00 Rp. 3,800.00

0.150 Ltr Minyak Bekisting Rp. 7,800.00 Rp. 1,170.00

0.015 M3 Kayu Klas II (Balok) Rp. 2,800,000.00 Rp. 42,000.00

0.350 Lbr Multipleks 6mm Rp. 66,700.00 Rp. 23,345.00

2.000 Lbr Rp. 11,000.00 Rp. 22,000.00

Dolken Kayu Galam Ø8-10

Dolken Kayu Galam Ø8-10

Dolken Kayu Galam Ø8-10

Page 45: Latihan RAB

Upah :

0.320 Oh Pekerja Rp. 35,000.00 Rp. 11,200.00

0.330 Oh Tukang Kayu Rp. 45,000.00 Rp. 14,850.00

0.033 Oh Kepala Tukang Rp. 55,000.00 Rp. 1,815.00

0.006 Oh Mandor Rp. 50,000.00 Rp. 300.00

7.11 1 M3 Membuat Beton Dengan Mutu K 225

Bahan :

388.000 Kg Semen Portland Rp. 880.00 Rp. 341,440.00

0.650 M3 Pasir Beton Rp. 85,000.00 Rp. 55,250.00

0.650 M3 Koral Beton / Split Rp. 215,500.00 Rp. 140,075.00

Upah :

6.000 Oh Pekerja Rp. 35,000.00 Rp. 210,000.00

1.000 Oh Tukang Batu Rp. 45,000.00 Rp. 45,000.00

0.100 Oh Kepala Tukang Rp. 55,000.00 Rp. 5,500.00

0.300 Oh Mandor Rp. 50,000.00 Rp. 15,000.00

7.12 1 M3 Membuat Beton Dengan Mutu K 275

Bahan :

400.000 Kg Semen Portland Rp. 880.00 Rp. 352,000.00

0.400 M3 Pasir Beton Rp. 85,000.00 Rp. 34,000.00

0.820 M3 Koral Beton / Split Rp. 215,500.00 Rp. 176,710.00

Upah :

6.000 Oh Pekerja Rp. 35,000.00 Rp. 210,000.00

1.000 Oh Tukang Batu Rp. 45,000.00 Rp. 45,000.00

0.100 Oh Kepala Tukang Rp. 55,000.00 Rp. 5,500.00

0.300 Oh Mandor Rp. 50,000.00 Rp. 15,000.00

7.13 1 Kg Pembesian Dengan Besi Polos

Bahan :

1.050 Kg Besi Beton Polos Rp. 6,400.00 Rp. 6,720.00

0.015 Kg Kawat Beton Rp. 9,500.00 Rp. 142.50

Page 46: Latihan RAB

Upah :

0.007 Oh Pekerja Rp. 35,000.00 Rp. 245.00

0.007 Oh Tukang Besi Rp. 45,000.00 Rp. 315.00

0.0007 Oh Kepala Tukang Rp. 55,000.00 Rp. 38.50

0.0003 Oh Mandor Rp. 50,000.00 Rp. 15.00

PP 1 M3 PONDASI POER BETON (Besi Polos 130 Kg) - BETON K-275

1.000 M3 Beton K - 275 Rp. 838,210.00 Rp. 838,210.00

130.000 Kg Pek. Besi Polos Rp. 7,476.00 Rp. 971,880.00

8.500 M2 Cetakan Beton, dibong- Rp. 67,510.00 Rp. 573,835.00

kar & menyiram beton

SLOOF BETON

S2 1 M3 SLOOF BETON 15/30 (Besi Polos 154 Kg) - BETON K-275

1.000 M3 Beton K - 275 Rp. 838,210.00 Rp. 838,210.00

154.000 Kg Pek. Besi Polos Rp. 7,476.00 Rp. 1,151,304.00

11.333 M2 Cetakan Beton, dibong- Rp. 72,510.00 Rp. 821,759.46

kar & menyiram beton

S1 1 M3 SLOOF BETON UTAMA 20/35 (Besi Polos 149 Kg) - BETON K-275

1.000 M3 Beton K - 275 Rp. 838,210.00 Rp. 838,210.00

149.000 Kg Pek. Besi Polos Rp. 7,476.00 Rp. 1,113,924.00

10.000 M2 Cetakan Beton, dibong- Rp. 72,510.00 Rp. 725,100.00

kar & menyiram beton

KOLOM

KP 1 M3 KOLOM PRAKTIS 15/15 TIPE KP (Besi Polos 203 Kg) - BETON K-225

1.000 M3 Beton K - 225 Rp. 812,265.00 Rp. 812,265.00

203.000 Kg Pek. Besi Polos Rp. 7,476.00 Rp. 1,517,628.00

11.332 M2 Cetakan Beton, dibong- Rp. 160,170.00 Rp. 1,815,078.47

kar & menyiram beton

K.1 1 M3 KOLOM 30/60 TIPE K1 (Besi Polos 106 Kg) - BETON K-275

1.000 M3 Beton K - 300 Rp. 812,265.00 Rp. 812,265.00

106.000 Kg Pek. Besi Polos Rp. 7,476.00 Rp. 792,456.00

8.500 M2 Cetakan Beton, dibong- Rp. 160,170.00 Rp. 1,361,445.00

kar & menyiram beton

K.3 1 M3 KOLOM INDUK 30/40 TIPE K3 (Besi Polos 147 Kg) - BETON K-275

Page 47: Latihan RAB

1.000 M3 Beton K - 275 Rp. 838,210.00 Rp. 838,210.00

147.000 Kg Pek. Besi Polos Rp. 7,476.00 Rp. 1,098,972.00

11.660 M2 Cetakan Beton, dibong- Rp. 160,170.00 Rp. 1,867,582.20

kar & menyiram beton

K.1' 1 M3 KOLOM INDUK 30/40 TIPE K1' (Besi Polos 118 Kg) - BETON K-275

1.000 M3 Beton K - 275 Rp. 838,210.00 Rp. 838,210.00

118.000 Kg Pek. Besi Polos Rp. 7,476.00 Rp. 882,168.00

11.660 M2 Cetakan Beton, dibong- Rp. 160,170.00 Rp. 1,867,582.20

kar & menyiram beton

K.2 1 M3 KOLOM INDUK 30/30 TIPE K2 (Besi Polos 159 Kg) - BETON K-275

1.000 M3 Beton K - 275 Rp. 838,210.00 Rp. 838,210.00

159.000 Kg Pek. Besi Polos Rp. 7,476.00 Rp. 1,188,684.00

11.332 M2 Cetakan Beton, dibong- Rp. 160,170.00 Rp. 1,815,078.47

kar & menyiram beton

K.3 1 M3 KOLOM INDUK 15/30 TIPE K3 (Besi Polos 194 Kg) - BETON K-275

1.000 M3 Beton K - 275 Rp. 838,210.00 Rp. 838,210.00

194.000 Kg Pek. Besi Polos Rp. 7,476.00 Rp. 1,450,344.00

17.000 M2 Cetakan Beton, dibong- Rp. 160,170.00 Rp. 2,722,890.00

kar & menyiram beton

K.4 1 M3 KOLOM INDUK Ø 30 TIPE K4 (Besi Polos 151 Kg) - BETON K-275

1.000 M3 Beton K - 275 Rp. 838,210.00 Rp. 838,210.00

151.000 Kg Pek. Besi Polos Rp. 7,476.00 Rp. 1,128,876.00

11.535 M2 Cetakan Beton, dibong- Rp. 160,170.00 Rp. 1,847,480.87

kar & menyiram beton

K.5 1 M3 KOLOM INDUK Ø 40 TIPE K5 (Besi Polos 76 Kg) - BETON K-275

1.000 M3 Beton K - 275 Rp. 838,210.00 Rp. 838,210.00

76.000 Kg Pek. Besi Polos Rp. 7,476.00 Rp. 568,176.00

7.120 M2 Cetakan Beton, dibong- Rp. 160,170.00 Rp. 1,140,482.48

kar & menyiram beton

K.6 1 M3 KOLOM INDUK 15/25 TIPE K3 (Besi Polos 187 Kg) - BETON K-225

1.000 M3 Beton K - 225 Rp. 812,265.00 Rp. 812,265.00

187.000 Kg Pek. Besi Polos Rp. 7,476.00 Rp. 1,398,012.00

18.105 M2 Cetakan Beton, dibong- Rp. 160,170.00 Rp. 2,899,877.85

kar & menyiram beton

Page 48: Latihan RAB

BALOK

B.1 1 M3 BALOK INDUK 20/50 TIPE B1 (Besi Polos200 Kg) - BETON K-275

1.000 M3 Beton K - 275 Rp. 838,210.00 Rp. 838,210.00

200.000 Kg Pek. Besi Polos Rp. 7,476.00 Rp. 1,495,200.00

10.625 M2 Cetakan Beton, dibong- Rp. 169,270.00 Rp. 1,798,493.75

kar & menyiram beton

B.1 1 M3 BALOK INDUK 20/40 TIPE B2 (Besi Polos244 Kg) - BETON K-275

1.000 M3 Beton K - 275 Rp. 838,210.00 Rp. 838,210.00

244.000 Kg Pek. Besi Polos Rp. 7,476.00 Rp. 1,824,144.00

10.625 M2 Cetakan Beton, dibong- Rp. 169,270.00 Rp. 1,798,493.75

kar & menyiram beton

B.2 1 M3 BALOK INDUK 20/30 TIPE B2 (Besi Polos 263 Kg) - BETON K-275

1.000 M3 Beton K - 275 Rp. 838,210.00 Rp. 838,210.00

263.000 Kg Pek. Besi Polos Rp. 7,476.00 Rp. 1,966,188.00

11.330 M2 Cetakan Beton, dibong- Rp. 169,270.00 Rp. 1,917,913.73

kar & menyiram beton

B.3 1 M3 BALOK ANAK 15/30 TIPE B3 (Besi Polos 222 Kg) - BETON K-275

1.000 M3 Beton K - 275 Rp. 838,210.00 Rp. 838,210.00

222.000 Kg Pek. Besi Polos Rp. 7,476.00 Rp. 1,659,672.00

14.161 M2 Cetakan Beton, dibong- Rp. 169,270.00 Rp. 2,397,032.47

kar & menyiram beton

B.4 1 M3 BALOK KONSOL 15/30 TIPE B4 (Besi Polos 170 Kg) - BETON K-275

1.000 M3 Beton K - 275 Rp. 838,210.00 Rp. 838,210.00

170.000 Kg Pek. Besi Polos Rp. 7,476.00 Rp. 1,270,920.00

15.150 M2 Cetakan Beton, dibong- Rp. 169,270.00 Rp. 2,564,440.50

kar & menyiram beton

B.5 1 M3 BALOK LISPLANG 10/80 TIPE B5 (Besi Polos 107 Kg) - BETON K-275

1.000 M3 Beton K - 275 Rp. 838,210.00 Rp. 838,210.00

107.000 Kg Pek. Besi Polos Rp. 7,476.00 Rp. 799,932.00

18.063 M2 Cetakan Beton, dibong- Rp. 169,270.00 Rp. 3,057,439.38

kar & menyiram beton

B.L 1 M3 BALOK LATAI 15/15 TIPE BL (Besi Polos 107 Kg) - BETON K-225

1.000 M3 Beton K - 225 Rp. 812,265.00 Rp. 812,265.00

107.000 Kg Pek. Besi Polos Rp. 7,476.00 Rp. 799,932.00

14.166 M2 Cetakan Beton, dibong- Rp. 169,270.00 Rp. 2,397,838.20

kar & menyiram beton

RINGBALK

Page 49: Latihan RAB

R.1 1 M3 BALOK RINGBALK 20/40 TIPE R1 (Besi Polos 202 Kg) - BETON K-275

1.000 M3 Beton K - 275 Rp. 838,210.00 Rp. 838,210.00

202.000 Kg Pek. Besi Polos Rp. 7,476.00 Rp. 1,510,152.00

10.625 M2 Cetakan Beton, dibong- Rp. 169,270.00 Rp. 1,798,493.75

kar & menyiram beton

R.2 1 M3 BALOK RINGBALK 15/40 TIPE R2 (Besi Polos 224 Kg) - BETON K-275

1.000 M3 Beton K - 275 Rp. 838,210.00 Rp. 838,210.00

224.000 Kg Pek. Besi Polos Rp. 7,476.00 Rp. 1,674,624.00

13.455 M2 Cetakan Beton, dibong- Rp. 169,270.00 Rp. 2,277,612.49

kar & menyiram beton

R.3 1 M3 RINGBALK 15/30 TIPE R3 (Besi Polos 231 Kg) - BETON K-275

1.000 M3 Beton K - 275 Rp. 838,210.00 Rp. 838,210.00

231.000 Kg Pek. Besi Polos Rp. 7,476.00 Rp. 1,726,956.00

14.161 M2 Cetakan Beton, dibong- Rp. 169,270.00 Rp. 2,397,032.47

kar & menyiram beton

R.4 1 M3 RINGBALK 15/20 TIPE R4 (Besi Polos 215 Kg) - BETON K-275

1.000 M3 Beton K - 275 Rp. 838,210.00 Rp. 838,210.00

215.000 Kg Pek. Besi Polos Rp. 7,476.00 Rp. 1,607,340.00

15.581 M2 Cetakan Beton, dibong- Rp. 169,270.00 Rp. 2,637,455.11

kar & menyiram beton

LT 1 M3 PLAT LANTAI T. 12 CM (Besi Polos 102 Kg) - BETON K-275

1.000 M3 Beton K - 275 Rp. 838,210.00 Rp. 838,210.00

102.000 Kg Pek. Besi Polos Rp. 7,476.00 Rp. 762,552.00

7.081 M2 Cetakan Beton, dibong- Rp. 204,870.00 Rp. 1,450,582.04

kar & menyiram beton

D.1 1 M3 DAK BETON T. 12 CM (Besi Polos 113 Kg) - BETON K-275

1.000 M3 Beton K - 275 Rp. 838,210.00 Rp. 838,210.00

113.000 Kg Pek. Besi Polos Rp. 7,476.00 Rp. 844,788.00

7.081 M2 Cetakan Beton, dibong- Rp. 204,870.00 Rp. 1,450,582.04

kar & menyiram beton

D.2 1 M3 DAK BETON T. 10 CM (Besi Polos 125 Kg) - BETON K-275

1.000 M3 Beton K - 275 Rp. 838,210.00 Rp. 838,210.00

125.000 Kg Pek. Besi Polos Rp. 7,476.00 Rp. 934,500.00

8.500 M2 Cetakan Beton, dibong- Rp. 204,870.00 Rp. 1,741,395.00

kar & menyiram beton

Page 50: Latihan RAB

D.3 1 M3 MEJA BETON DAPUR DAN PANTRY T. 10 CM (Besi Polos 102Kg) - BETON K-225

1.000 M3 Beton K - 225 Rp. 812,265.00 Rp. 812,265.00

102.000 Kg Pek. Besi Polos Rp. 7,476.00 Rp. 762,552.00

5.000 M2 Cetakan Beton, dibong- Rp. 204,870.00 Rp. 1,024,350.00

kar & menyiram beton

D.4 1 M3 PROFILAN BETON KUSEN JENDELA T. 10 CM DAN SUNSCREEN (Besi Polos 106 Kg) - BETON K-225

1.000 M3 Beton K - 225 Rp. 812,265.00 Rp. 812,265.00

106.000 Kg Pek. Besi Polos Rp. 7,476.00 Rp. 792,456.00

5.499 M2 Cetakan Beton, dibong- Rp. 204,870.00 Rp. 1,126,580.13

kar & menyiram beton

T.1 1 M3 ANAK TANGGA BETON (Besi Polos 93 Kg) - BETON K-275

1.000 M3 Beton K - 275 Rp. 838,210.00 Rp. 838,210.00 93.000 Kg Pek. Besi Polos Rp. 7,476.00 Rp. 695,268.00 6.158 M2 Cetakan Beton, dibong- Rp. 150,480.00 Rp. 926,625.74

kar & menyiram beton

T.2 1 M3 PLAT BORDES TANGGA T. 12 CM (Besi Polos 176 Kg) - BETON K-275

1.000 M3 Beton K - 275 Rp. 838,210.00 Rp. 838,210.00 176.000 Kg Pek. Besi Polos Rp. 7,476.00 Rp. 1,315,776.00 7.500 M2 Cetakan Beton, dibong- Rp. 150,480.00 Rp. 1,128,554.86

kar & menyiram beton

T.3 1 M3 PONDASI TANGGA (Besi Polos 162 Kg) - BETON K-275

1.000 M3 Beton K - 275 Rp. 838,210.00 Rp. 838,210.00 162.000 Kg Pek. Besi Polos Rp. 7,476.00 Rp. 1,211,112.00 5.400 M2 Cetakan Beton, dibong- Rp. 150,480.00 Rp. 812,592.00

kar & menyiram beton

T.4 1 M3 BALOK BORDES TANGGA (Besi Polos 186 Kg) - BETON K-275

1.000 M3 Beton K - 275 Rp. 838,210.00 Rp. 838,210.00 186.000 Kg Pek. Besi Polos Rp. 7,476.00 Rp. 1,390,536.00 5.400 M2 Cetakan Beton, dibong- Rp. 150,480.00 Rp. 812,592.00

kar & menyiram beton

SW 1 M3 BETON SHEERWALL T.25cm (Besi Polos 71 Kg) - BETON K-275

1.000 M3 Beton K - 275 Rp. 838,210.00 Rp. 838,210.00 71.000 Kg Pek. Besi Polos Rp. 7,476.00 Rp. 530,796.00 7.200 M2 Cetakan Beton, dibong- Rp. 150,480.00 Rp. 1,083,456.00

kar & menyiram beton

8. PEKERJAAN PENUTUP ATAP

Page 51: Latihan RAB

8.1 1 M2 Pasang Atap Genteng Keramik

Bahan : 11.000 Bh Genteng Keramik Rp. 6,325.00 Rp. 69,575.00 0.030 Kg Paku Biasa 2" - 5" Rp. 9,500.00 Rp. 285.00

Upah : 0.200 Oh Pekerja Rp. 35,000.00 Rp. 7,000.00 0.100 Oh Tukang Kayu Rp. 45,000.00 Rp. 4,500.00 0.010 Oh Kepala Tukang Rp. 55,000.00 Rp. 550.00 0.010 Oh Mandor Rp. 50,000.00 Rp. 500.00

8.2 1 M' Pasang Nok Genteng Keramik

Bahan : 3.500 Bh Noak Genteng Keramik Rp. 16,675.00 Rp. 58,362.50 0.050 Kg Paku Biasa 2" - 5" Rp. 9,500.00 Rp. 475.00 10.800 Kg Semen Abu-abu Rp. 880.00 Rp. 9,504.00 0.032 M3 Pasir Pasang Rp. 85,000.00 Rp. 2,720.00 1.000 Kg Semen Warna Rp. 17,500.00 Rp. 17,500.00

Upah : 0.400 Oh Pekerja Rp. 35,000.00 Rp. 14,000.00 0.200 Oh Tukang Kayu Rp. 45,000.00 Rp. 9,000.00 0.020 Oh Kepala Tukang Rp. 55,000.00 Rp. 1,100.00 0.020 Oh Mandor Rp. 50,000.00 Rp. 1,000.00

8.1 1 M2 Pasang Atap Genteng Metal

Bahan :

1.720 Lbr Genteng Metal Rp. 43,125.00 Rp. 74,175.00

0.200 Kg Paku Biasa 2" - 5" Rp. 9,500.00 Rp. 1,900.00

Upah :

0.200 Oh Pekerja Rp. 35,000.00 Rp. 7,000.00

0.100 Oh Tukang Kayu Rp. 45,000.00 Rp. 4,500.00

0.010 Oh Kepala Tukang Rp. 55,000.00 Rp. 550.00

0.001 Oh Mandor Rp. 50,000.00 Rp. 50.00

8.2 1 M' Pasang Nok Genteng Metal

Bahan :

1.100 Bh Genteng Metal Rp. 40,250.00 Rp. 44,275.00

0.050 Kg Paku Biasa 1/2" - 1" Rp. 9,500.00 Rp. 475.00

F1022
intel: Menurut Analisa SI
F1035
intel: Menurut Analisa SI
F1054
intel: Menurut Analisa SI
F1067
intel: Menurut Analisa SI
Page 52: Latihan RAB

Upah :

0.250 Oh Pekerja Rp. 35,000.00 Rp. 8,750.00

0.150 Oh Tukang Kayu Rp. 45,000.00 Rp. 6,750.00

0.015 Oh Kepala Tukang Rp. 55,000.00 Rp. 825.00

0.013 Oh Mandor Rp. 50,000.00 Rp. 650.00

8.3 1 M2 Pasang Karet Pelapis Genteng

Bahan :

1.050 M2 Karet Pelapis Rp. 10,000.00 Rp. 10,500.00

0.020 Kg Paku Biasa Rp. 9,500.00 Rp. 190.00

Upah :

0.100 Oh Pekerja Rp. 35,000.00 Rp. 3,500.00

0.200 Oh Tukang Kayu Rp. 45,000.00 Rp. 9,000.00

0.020 Oh Kepala Tukang Rp. 55,000.00 Rp. 1,100.00

0.005 Oh Mandor Rp. 50,000.00 Rp. 250.00

8.4 1 M2 Pasang Aluminium Foil / Sisalation

Bahan :

1.050 Lbr Aluminium Foil / SisalationRp. 15,500.00 Rp. 16,275.00

Upah :

0.150 Oh Pekerja Rp. 35,000.00 Rp. 5,250.00

0.050 Oh Tukang Kayu Rp. 45,000.00 Rp. 2,250.00

0.005 Oh Kepala Tukang Rp. 55,000.00 Rp. 275.00

0.008 Oh Mandor Rp. 50,000.00 Rp. 400.00

9. Pekerjaan Langit-Langit

9.1 1 M2 Langit -Langit Kalsibord, Tebal 3,5 mm

Bahan :

0.364 Lbr Kalsibord (120x240x3,5) Rp. 49,800.00 Rp. 18,127.20

0.110 Kg Paku Gypsum Rp. 20,570.00 Rp. 2,262.70

Upah :

0.100 Oh Pekerja Rp. 35,000.00 Rp. 3,500.00

0.050 Oh Tukang Kayu Rp. 45,000.00 Rp. 2,250.00

0.005 Oh Kepala Tukang Rp. 55,000.00 Rp. 275.00

F1093
intel: Menurut Analisa SI
Page 53: Latihan RAB

0.005 Oh Mandor Rp. 50,000.00 Rp. 250.00

9.2 1 M' List Langit-Langit Profil Gisum 8x8 cm

Bahan :

1.100 Lbr Profil Gipsum 8x8cm TypeRp. 16,500.00 Rp. 18,150.00

0.010 Kg Paku Biasa Rp. 9,500.00 Rp. 95.00

Upah :

0.050 Oh Pekerja Rp. 35,000.00 Rp. 1,750.00

0.050 Oh Tukang Kayu Rp. 45,000.00 Rp. 2,250.00

0.005 Oh Kepala Tukang Rp. 55,000.00 Rp. 275.00

0.003 Oh Mandor Rp. 50,000.00 Rp. 150.00

10. Pekerjaan Sanitasi

10.1 Memasang 1 Buah Kloset Duduk Porselen

Bahan :

1.000 Bh Kloset Duduk Porselin Rp. 500,000.00 Rp. 500,000.00

0.060 Unit Perlengkapan Rp. 500,000.00 Rp. 30,000.00

Upah :

3.300 Oh Pekerja Rp. 35,000.00 Rp. 115,500.00

1.100 Oh Tukang Batu Rp. 45,000.00 Rp. 49,500.00

0.001 Oh Kepala Tukang Rp. 55,000.00 Rp. 55.00

0.160 Oh Mandor Rp. 50,000.00 Rp. 8,000.00

10.2 Memasang 1 Buah Kloset Jongkok Porselen

Bahan :

1.000 Bh Kloset Jongkok Porselin Rp. 165,000.00 Rp. 165,000.00

6.000 Kg Semen Portland Rp. 880.00 Rp. 5,280.00

0.010 M3 Pasir Pasang Rp. 85,000.00 Rp. 850.00

Upah :

1.000 Oh Pekerja Rp. 35,000.00 Rp. 35,000.00

1.500 Oh Tukang Batu Rp. 45,000.00 Rp. 67,500.00

1.500 Oh Kepala Tukang Rp. 55,000.00 Rp. 82,500.00

0.160 Oh Mandor Rp. 50,000.00 Rp. 8,000.00

10.3 Memasang 1 Buah Urinoir

Page 54: Latihan RAB

Bahan : 1.000 Bh Urinoir Rp. 600,000.00 Rp. 600,000.00 0.300 Unit Perlengkapan Rp. 600,000.00 Rp. 180,000.00 6.000 Kg Semen Portland Rp. 880.00 Rp. 5,280.00 0.010 M3 Pasir Pasang Rp. 85,000.00 Rp. 850.00

Upah : 1.000 Oh Pekerja Rp. 35,000.00 Rp. 35,000.00 1.000 Oh Tukang Batu Rp. 45,000.00 Rp. 45,000.00 0.100 Oh Kepala Tukang Rp. 55,000.00 Rp. 5,500.00 0.100 Oh Mandor Rp. 50,000.00 Rp. 5,000.00

10.4 Memasang 1 Buah Washtafel

Bahan : 1.000 Bh Washtafel Rp. 435,000.00 Rp. 435,000.00 0.120 Unit Perlengkapan Rp. 435,000.00 Rp. 52,200.00 6.000 Kg Semen Portland Rp. 880.00 Rp. 5,280.00 0.010 M3 Pasir Pasang Rp. 85,000.00 Rp. 850.00

Upah : 1.200 Oh Pekerja Rp. 35,000.00 Rp. 42,000.00 1.450 Oh Tukang Batu Rp. 45,000.00 Rp. 65,250.00 0.150 Oh Kepala Tukang Rp. 55,000.00 Rp. 8,250.00 0.100 Oh Mandor Rp. 50,000.00 Rp. 5,000.00

10.5 Memasang 1 Buah Bak Mandi Fibreglass Volume 0,3 m3

Bahan : 1.000 Bh Bak Mandi Fibreglass Rp. 200,000.00 Rp. 200,000.00 0.180 Unit Perlengkapan Rp. 200,000.00 Rp. 36,000.00

Upah : 1.800 Oh Pekerja Rp. 35,000.00 Rp. 63,000.00 2.700 Oh Tukang Batu Rp. 45,000.00 Rp. 121,500.00 0.540 Oh Kepala Tukang Rp. 55,000.00 Rp. 29,700.00 0.110 Oh Mandor Rp. 50,000.00 Rp. 5,500.00

10.6 Memasang 1 Buah Bak Kontrol Pasangan Batu Bata Ukuran (60x60x65 cm)

Bahan : 0.371 M3 Batu Bata Rp. 180,000.00 Rp. 66,780.00 114.000 Kg Semen Portland Rp. 880.00 Rp. 100,320.00 0.184 M3 Pasir Pasang Rp. 85,000.00 Rp. 15,640.00 0.033 M3 Batu Koral Rp. 175,250.00 Rp. 5,783.25 4.850 Kg Besi Beton Rp. 6,400.00 Rp. 31,040.00 0.120 M3 Pasir Beton Rp. 85,000.00 Rp. 10,200.00

Upah : 2.160 Oh Pekerja Rp. 35,000.00 Rp. 75,600.00

Page 55: Latihan RAB

0.720 Oh Tukang Batu Rp. 45,000.00 Rp. 32,400.00 0.072 Oh Kepala Tukang Rp. 55,000.00 Rp. 3,960.00 0.108 Oh Mandor Rp. 50,000.00 Rp. 5,400.00 0.108 Oh Tukang Gali Rp. 35,000.00 Rp. 3,780.00

10.7

Bahan :

1.200 M' Pipa Galvanis Ø 1/2" Rp. 16,291.67 Rp. 19,550.00

0.350 Perlengkapan Rp. 16,291.67 Rp. 5,702.08

1.200 M' Pipa Galvanis Ø 3/4" Rp. 21,562.50 Rp. 25,875.00

0.350 Perlengkapan Rp. 21,562.50 Rp. 7,546.87

Upah :

0.054 Oh Pekerja Rp. 35,000.00 Rp. 1,890.00

0.090 Oh Tukang Batu Rp. 45,000.00 Rp. 4,050.00

0.009 Oh Kepala Tukang Rp. 55,000.00 Rp. 495.00

0.027 Oh Mandor Rp. 50,000.00 Rp. 1,350.00

Pipa Galvanis Ø 1/2"

Pipa Galvanis Ø 3/4"

10.8

Bahan :

1.200 M' Rp. 61,333.33 Rp. 73,600.00

0.350 Perlengkapan Rp. 61,333.33 Rp. 21,466.67

1.200 M' Rp. 27,791.67 Rp. 33,350.00

0.350 Perlengkapan Rp. 27,791.67 Rp. 9,727.08

1.200 M' Rp. 17,250.00 Rp. 20,700.00

0.350 Perlengkapan Rp. 17,250.00 Rp. 6,037.50

Upah :

0.081 Oh Pekerja Rp. 35,000.00 Rp. 2,835.00

0.135 Oh Tukang Batu Rp. 45,000.00 Rp. 6,075.00

0.0135 Oh Kepala Tukang Rp. 55,000.00 Rp. 742.50

0.0041 Oh Mandor Rp. 50,000.00 Rp. 205.00

Pipa PVC AW Ø 6

Pipa PVC AW Ø 4

Pipa PVC AW Ø 3

10.9

Bahan :

1.000 Bh Kran Air Rp. 15,000.00 Rp. 15,000.00

0.025 Bh Seal Tape Rp. 5,400.00 Rp. 135.00

Upah :

0.010 Oh Pekerja Rp. 35,000.00 Rp. 350.00

Memasang 1 M' Pipa Galvanis Ø 1/2", Ø 3/4" Dan Ø 1"

Memasang 1 M' Pipa PVC Tipe AW Ø 3" Dan Ø 4"

Pipa PVC AW Ø 6"

Pipa PVC AW Ø 4"

Pipa PVC AW Ø 3"

Memasang 1 Buah Kran Ø 3/4" Atau Ø 1/2"

Page 56: Latihan RAB

0.100 Oh Tukang Batu Rp. 45,000.00 Rp. 4,500.00

0.010 Oh Kepala Tukang Rp. 55,000.00 Rp. 550.00

0.005 Oh Mandor Rp. 50,000.00 Rp. 250.00

10.10 Memasang 1 Buah Floor Drain

Bahan :

1.000 Bh Floor Drain Rp. 12,500.00 Rp. 12,500.00

Upah :

0.010 Oh Pekerja Rp. 35,000.00 Rp. 350.00

0.100 Oh Tukang Batu Rp. 45,000.00 Rp. 4,500.00

0.010 Oh Kepala Tukang Rp. 55,000.00 Rp. 550.00

0.005 Oh Mandor Rp. 50,000.00 Rp. 250.00

11. PEKERJAAN KUNCI DAN KACA

11.1 Memasang 1 Buah Kunci Tanam Antik

Bahan :

1.000 Bh Kunci Tanam Antik Rp. 225,000.00 Rp. 225,000.00

Upah :

0.060 Oh Pekerja Rp. 35,000.00 Rp. 2,100.00

0.600 Oh Tukang Kayu Rp. 45,000.00 Rp. 27,000.00

0.060 Oh Kepala Tukang Rp. 55,000.00 Rp. 3,300.00

0.003 Oh Mandor Rp. 50,000.00 Rp. 150.00

11.3 Memasang 1 Buah Engsel Pintu

Bahan :

1.000 Bh Engsel Pintu Rp. 6,000.00 Rp. 6,000.00

Upah :

0.015 Oh Pekerja Rp. 35,000.00 Rp. 525.00

0.150 Oh Tukang Kayu Rp. 45,000.00 Rp. 6,750.00

0.015 Oh Kepala Tukang Rp. 55,000.00 Rp. 825.00

0.00075 Oh Mandor Rp. 50,000.00 Rp. 37.50

11.5 Memasang 1 Buah Door Closer / Door Holder

Bahan :

1.000 Bh Door Closer Rp. 110,000.00 Rp. 110,000.00

Page 57: Latihan RAB

1.000 Bh Door Holder ( 2 Daun) Rp. 160,000.00 Rp. 160,000.00

Upah :

0.050 Oh Pekerja Rp. 35,000.00 Rp. 1,750.00

0.500 Oh Tukang Kayu Rp. 45,000.00 Rp. 22,500.00

0.050 Oh Kepala Tukang Rp. 55,000.00 Rp. 2,750.00

0.0025 Oh Mandor Rp. 50,000.00 Rp. 125.00

Door Closer

Door Holder ( 2 Daun)

11.7 Memasang 1 M2 Kaca, Tebal 5mm

Bahan :

1.100 M2 Kaca Bening 5mm Rp. 74,750.00 Rp. 82,225.00

1.100 M2 Kaca Rayben 5mm Rp. 86,250.00 Rp. 94,875.00

Upah :

0.015 Oh Pekerja Rp. 35,000.00 Rp. 525.00

0.150 Oh Tukang Kayu Rp. 45,000.00 Rp. 6,750.00

0.015 Oh Kepala Tukang Rp. 55,000.00 Rp. 825.00

0.00075 Oh Mandor Rp. 50,000.00 Rp. 37.50

Kaca Bening 5mm

Kaca Rayben 5mm

12. PEKERJAAN BESI DAN ALUMINIUM

12.1 1 M' Pasangan Kuseng Aluminium

Bahan :

1.100 M' Kuseng Aluminium Rp. 25,000.00 Rp. 27,500.00

1.100 M' Karet Pelapis Rp. 2,040.00 Rp. 2,244.00

4.000 Bh Paku Mur Rp. 500.00 Rp. 2,000.00

Upah :

0.300 Oh Pekerja Rp. 35,000.00 Rp. 10,500.00

0.500 Oh Tukang Aluminium Rp. 45,000.00 Rp. 22,500.00

0.1500 Oh Kepala Tukang Rp. 55,000.00 Rp. 8,250.00

0.1000 Oh Mandor Rp. 50,000.00 Rp. 5,000.00

12.2 1 M' Membuat Bingkai Jendela Dan Pintu Aluminium

Upah :

1.100 M' Bingkai Aluminium Rp. 22,950.00 Rp. 25,245.00

1.100 M' Karet Pelapis Rp. 2,040.00 Rp. 2,244.00

1.000 Engsel & Asesoris Rp. 22,950.00 Rp. 22,950.00

Page 58: Latihan RAB

10.000 Bh Paku Mur Rp. 500.00 Rp. 5,000.00

Bahan :

1.200 Oh Pekerja Rp. 35,000.00 Rp. 42,000.00

1.200 Oh Tukang Aluminium Rp. 45,000.00 Rp. 54,000.00

0.400 Oh Kepala Tukang Rp. 55,000.00 Rp. 22,000.00

0.300 Oh Mandor Rp. 50,000.00 Rp. 15,000.00

12.3 1 M2 Pasang Pintu Aluminum

Bahan :

1.000 M2 Pintu Aluminium Rp. 359,375.00 Rp. 359,375.00

Upah :

1.050 Oh Pekerja Rp. 35,000.00 Rp. 36,750.00

1.050 Oh Tukang Aluminium Rp. 45,000.00 Rp. 47,250.00

0.105 Oh Kepala Tukang Rp. 55,000.00 Rp. 5,775.00

0.0052 Oh Mandor Rp. 50,000.00 Rp. 260.00

12.4 1 M2 Pasang Rangka Plafond Baja Ringan

Bahan :

1.770 M' Rangka Hollow 2x4 Rp. 4,590.00 Rp. 8,124.30

1.350 M' Rangka Hollow 4x4 Rp. 6,120.00 8,262.00

6.000 Bh Paku Ramset Rp. 100.00 600.00

Upah :

0.600 Oh Pekerja Rp. 35,000.00 Rp. 21,000.00

0.300 Oh Tukang Aluminium Rp. 45,000.00 Rp. 13,500.00

0.030 Oh Kepala Tukang Rp. 55,000.00 Rp. 1,650.00

0.030 Oh Mandor Rp. 50,000.00 Rp. 1,500.00

12.4 1 M2 Lapisan Aluminium Composite

Bahan Rangka:

0.900 M' Top Croos 200 Rp. 9,775.00 Rp. 8,797.50

2.300 M' Furring Channel 204 Rp. 12,075.00 Rp. 27,772.50

2.070 Bh Metal Joiner 210 Rp. 632.50 Rp. 1,309.27

0.810 Bh Suspension Spring Clip Rp. 1,782.50 Rp. 1,443.82

0.410 Bh Suspension Rod 3,6cm 22Rp. 7,015.00 Rp. 2,876.15

0.810 Bh Angle Bracke 220 Rp. 1,265.00 Rp. 1,024.65

0.810 Bh Fastener Nail For ConcreteRp. 1,840.00 Rp. 1,490.40

0.400 Bh Wall Angle 212 Rp. 6,325.00 Rp. 2,530.00

Page 59: Latihan RAB

8.000 Bh Concrete Nail Rp. 2,300.00 Rp. 18,400.00

Bahan Alcapone

0.380 Lbr Alcapone (XI 64116 Silver)Rp. 902,750.00 Rp. 343,045.00

0.320 Roll Paper Tape 76 m Rp. 25,300.00 Rp. 8,096.00

20.830 Bh Screw Rp. 575.00 Rp. 11,977.25

Upah :

3.200 Oh Tukang Aluminium Rp. 45,000.00 Rp. 144,000.00

2.500 Oh Kepala Tukang Rp. 55,000.00 Rp. 137,500.00

0.300 Oh Mandor Rp. 50,000.00 Rp. 15,000.00

13. PEKERJAAN PENUTUP LANTAI DAN DINDING

13.1 1 m2 Pasang Lantai Keramik

Keramik :

6.500 Bh Keramik 40 x 40 Rp. 7,700.00 Rp. 50,050.00

11.500 Bh Keramik 30 x 30 Rp. 3,700.00 Rp. 42,550.00

11.500 Bh Keramik 30 x 30 Anti SlipRp. 5,550.00 Rp. 63,825.00

Bahan 11.380 Kg Semen Portland Rp. 880.00 Rp. 10,014.40

0.042 M3 Pasir Pasang Rp. 85,000.00 Rp. 3,570.00

1.500 Kg Semen Warna Rp. 17,500.00 Rp. 26,250.00

Upah :

0.620 Oh Pekerja Rp. 35,000.00 Rp. 21,700.00

0.350 Oh Tukang Batu Rp. 45,000.00 Rp. 15,750.00

0.035 Oh Kepala Tukang Rp. 55,000.00 Rp. 1,925.00

0.030 Oh Mandor Rp. 50,000.00 Rp. 1,500.00

Keramik 40 x 40 ………………………

Keramik 30 x 30 ………………………

Keramik 30 x 30 Anti S ………………

Page 60: Latihan RAB

13.2 1 m2 Pasang Dindingi Keramik

Keramik : 33.500 Bh List Keramik 10 x 30 Rp. 1,200.00 Rp. 40,200.00 20.000 Bh Keramik 20 x 25 Rp. 2,200.00 Rp. 44,000.00 11.500 Bh Keramik 30 x 30 Rp. 3,700.00 Rp. 42,550.00

Bahan 9.300 Kg Semen Abu-Abu Rp. 880.00 Rp. 8,184.00 0.018 M3 Pasir Pasang Rp. 85,000.00 Rp. 1,530.00 1.500 Kg Semen Warna Rp. 17,500.00 Rp. 26,250.00

Upah : 0.600 Oh Pekerja Rp. 35,000.00 Rp. 21,000.00 0.100 Oh Tukang Batu Rp. 45,000.00 Rp. 4,500.00 0.045 Oh Kepala Tukang Rp. 55,000.00 Rp. 2,475.00 0.030 Oh Mandor Rp. 50,000.00 Rp. 1,500.00

List Keramik 10 x 30………………………

Keramik 20 x 25 ………………………

Keramik 30 x 30 ………………………

13.3 1 M' Pasang Plint Keramik

Plint Keramik :

50.000 Bh Plint Keramik 10 x 20 Rp. 800.00 Rp. 40,000.00

Bahan

1.650 Kg Semen Portland Rp. 880.00 Rp. 1,452.00

0.0032 M3 Pasir Pasang Rp. 85,000.00 Rp. 272.00

0.100 Kg Semen Warna Rp. 17,500.00 Rp. 1,750.00

Upah :

0.090 Oh Pekerja Rp. 35,000.00 Rp. 3,150.00

0.090 Oh Tukang Batu Rp. 45,000.00 Rp. 4,050.00

0.009 Oh Kepala Tukang Rp. 55,000.00 Rp. 495.00

0.0045 Oh Mandor Rp. 50,000.00 Rp. 225.00

Plint Keramik 10 x 10 ……………………

Plint Keramik 15 x 20 ……………………

Plint Keramik 10 x 20 ……………………

13.4 1 m2 Pasang Lantai Granit

Granit

2.800 Bh Granit 60x60 Rp. 55,000.00 Rp. 154,000.00

11.200 Bh Granit 40x40 Rp. 51,000.00 Rp. 571,200.00

16.666 Bh Granit 10x60 Rp. 9,166.67 Rp. 152,771.67

Bahan

14.150 Kg Semen Portland Rp. 880.00 Rp. 12,452.00

0.039 M3 Pasir Pasang Rp. 85,000.00 Rp. 3,315.00

2.000 Kg Semen Warna Rp. 17,500.00 Rp. 35,000.00

Upah :

0.620 Oh Pekerja Rp. 35,000.00 Rp. 21,700.00

0.350 Oh Tukang Batu Rp. 45,000.00 Rp. 15,750.00

Page 61: Latihan RAB

0.035 Oh Kepala Tukang Rp. 55,000.00 Rp. 1,925.00

0.030 Oh Mandor Rp. 50,000.00 Rp. 1,500.00

Granit 60x60

Granit 40x40

Granit 10x60

13.6 1 M2 Pasang Batu Tempel

Keramik :

1.050 M2 Batu Tempel (Lokal) Rp. 50,000.00 Rp. 52,500.00

Bahan

11.750 Kg Semen Abu-Abu Rp. 1,500.00 Rp. 17,625.00

0.035 M3 Pasir Pasang Rp. 85,000.00 Rp. 2,975.00

Upah :

0.620 Oh Pekerja Rp. 35,000.00 Rp. 21,700.00

0.350 Oh Tukang Batu Rp. 45,000.00 Rp. 15,750.00

0.035 Oh Kepala Tukang Rp. 55,000.00 Rp. 1,925.00

0.030 Oh Mandor Rp. 50,000.00 Rp. 1,500.00

Batu Tempel (Lokal) ……………………

13.4 1 M2 Plint Kayu 2 x 10 cm

Bahan

0.0024 M3 Kayu Klas I (Papan) Rp. 5,250,000.00 Rp. 12,600.00

0.0500 Kg Paku Skrup 3,5" Rp. 9,500.00 Rp. 475.00

Upah :

0.120 Oh Pekerja Rp. 35,000.00 Rp. 4,200.00

0.120 Oh Tukang Kayu Rp. 45,000.00 Rp. 5,400.00

0.012 Oh Kepala Tukang Rp. 55,000.00 Rp. 660.00

0.006 Oh Mandor Rp. 50,000.00 Rp. 300.00

14. PEKERJAAN PENGECATAN

14.1 1 M2 Mengecat Bidang Kayu Lama

Bahan :

0.150 Kg Plamir Rp. 7,500.00 Rp. 1,125.00

0.170 Kg Cat Dasar Rp. 11,500.00 Rp. 1,955.00

0.170 Kg Cat Penutup (Dulux) Rp. 50,000.00 Rp. 8,500.00

Upah :

0.070 Oh Pekerja Rp. 35,000.00 Rp. 2,450.00

0.075 Oh Tukang Cat Rp. 45,000.00 Rp. 3,375.00

0.0075 Oh Kepala Tukang Rp. 55,000.00 Rp. 412.50

0.0025 Oh Mandor Rp. 50,000.00 Rp. 125.00

Page 62: Latihan RAB

14.1 1 M2 Mengecat Bidang Kayu Baru (1x Plamur), 1x Cat Dasar Dan 2x Cat Penutup

Bahan :

0.200 Kg Cat Meni Rp. 9,000.00 Rp. 1,800.00

0.150 Kg Plamir Rp. 7,500.00 Rp. 1,125.00

0.170 Kg Cat Dasar Rp. 11,500.00 Rp. 1,955.00

0.260 Kg Cat Penutup 2x (Dulux) Rp. 50,000.00 Rp. 13,000.00

Upah :

0.070 Oh Pekerja Rp. 35,000.00 Rp. 2,450.00

0.009 Oh Tukang Cat Rp. 45,000.00 Rp. 405.00

0.006 Oh Kepala Tukang Rp. 55,000.00 Rp. 330.00

0.0025 Oh Mandor Rp. 50,000.00 Rp. 125.00

14.2 1 M2 Mengecat Tembok Baru ( 1x Plamur, 1x Cat Dasar, 2x Cat Penutup)

Bahan :

0.100 Kg Plamir Rp. 7,500.00 Rp. 750.00

0.100 Kg Cat Dasar Rp. 11,500.00 Rp. 1,150.00

0.260 Kg Cat Penutup 2x (Metrolite)Rp. 18,750.00 Rp. 4,875.00

0.260 Kg Cat Penutup 2x ( WatershiRp. 46,000.00 Rp. 11,960.00

Upah :

0.020 Oh Pekerja Rp. 35,000.00 Rp. 700.00

0.063 Oh Tukang Cat Rp. 45,000.00 Rp. 2,835.00

0.0063 Oh Kepala Tukang Rp. 55,000.00 Rp. 346.50

0.0025 Oh Mandor Rp. 50,000.00 Rp. 125.00

Cat Penutup 2x (Metrolite)

Cat Penutup 2x ( Watershield)

14.3 1 M2 Mengecat Tembok Lama ( 1x Cat Dasar, 2x Cat Penutup)

Bahan :

0.120 Kg Cat Dasar Rp. 11,500.00 Rp. 1,380.00

0.180 Kg Cat Penutup 2x (Dulux) Rp. 50,000.00 Rp. 9,000.00

Upah :

0.028 Oh Pekerja Rp. 35,000.00 Rp. 980.00

0.042 Oh Tukang Cat Rp. 45,000.00 Rp. 1,890.00

0.0042 Oh Kepala Tukang Rp. 55,000.00 Rp. 231.00

0.0025 Oh Mandor Rp. 50,000.00 Rp. 125.00

Page 63: Latihan RAB
Page 64: Latihan RAB

ANALISA HARGA SATUAN PEKERJAAN

Rp. 251,534.50

Rp. 25,100.00

Rp. 276,634.50

Rp. 61,940.00

Rp. 791,097.50

Page 65: Latihan RAB

Rp. 224,000.00

Rp. 1,015,097.50

Rp. 665,865.00

Rp. 138,500.00

Rp. 804,365.00

Rp. 6,000.00

Rp. 37,500.00

Rp. 234,995.00

Page 66: Latihan RAB

Rp. 16,000.00

Rp. 21,010.00

Rp. 29,375.00

Rp. 7,670.00

Rp. 20,000.00

Rp. 96,800.00

Rp. 100,000.00

Rp. 534,405.00

Page 67: Latihan RAB

Rp. 372,135.00

Rp. 205,145.00

Rp. 625,960.00

Rp. 101,080.00

Rp. 34,350.00

Rp. 135,430.00

Page 68: Latihan RAB

Rp. 87,269.00

Rp. 34,350.00

Rp. 121,619.00

Rp. 47,906.00

Rp. 17,000.00

Rp. 64,906.00

Rp. 41,775.00

Rp. 17,000.00

Rp. 58,775.00

Rp. 40,173.40

Page 69: Latihan RAB

Rp. 17,000.00

Rp. 57,173.40

Rp. 8,925.00

Rp. 15,075.00

Rp. 24,000.00

Rp. 6,276.00

Rp. 15,075.00

Rp. 21,351.00

Rp. 5,671.60

Rp. 15,075.00

Rp. 20,746.60

Page 70: Latihan RAB

Rp. 9,714.00

Rp. 19,850.00

Rp. 29,564.00

Rp. 8,006.60

Rp. 19,850.00

Rp. 27,856.60

Rp. 107,090.00

Rp. 21,350.00

Rp. 128,440.00

Rp. 1,816.04

Page 71: Latihan RAB

Rp. 99,500.00

Rp. 101,316.04

Rp. 10,131.60

Rp. 5,500,000.00

Rp. 1,235,000.00

Rp. 6,735,000.00

Rp. 210,000.00

Rp. 163,750.00

Rp. 373,750.00

Rp. 183,750.00

Page 72: Latihan RAB

Rp. 131,000.00

Rp. 314,750.00

Rp. 336,000.00

Rp. 201,500.00

Rp. 537,500.00

Rp. 5,852,600.00

Rp. 756,000.00

Rp. 6,608,600.00

Rp. 71,425.00

Rp. 8,800.00

Rp. 80,225.00

Page 73: Latihan RAB

Rp. 40,625.00

Rp. 8,800.00

Rp. 49,425.00

Rp. 15,667.50

Rp. 20,840.00

Rp. 36,507.50

Rp. 60,950.00

Rp. 21,625.00

Rp. 82,575.00

Rp. 34,550.00

Page 74: Latihan RAB

Rp. 21,625.00

Rp. 56,175.00

Rp. 58,225.00

Rp. 15,210.00

Rp. 73,435.00

0.006

0.012

Rp. 76,695.00

Rp. 21,625.00

Rp. 98,320.00

Rp. 75,150.00

Page 75: Latihan RAB

Rp. 31,725.00

Rp. 106,875.00

Rp. 475.00

Rp. 4,727.50

Rp. 5,202.50

Rp. 4,462.50

Rp. 1,840.00

Rp. 6,302.50

Rp. 423,525.00

Rp. 74,375.00

Rp. 497,900.00

Page 76: Latihan RAB

Rp. 415,880.00

Rp. 74,375.00

Rp. 490,255.00

Rp. 20,492.00

Rp. 41,560.00

Rp. 62,052.00

Rp. 43,630.00

Rp. 23,880.00

Rp. 67,510.00

Rp. 48,630.00

Page 77: Latihan RAB

Rp. 23,880.00

Rp. 72,510.00

Rp. 132,705.00

Rp. 27,465.00

Rp. 160,170.00

Rp. 141,105.00

Rp. 28,165.00

Rp. 169,270.00

Page 78: Latihan RAB

Rp. 176,705.00

Rp. 28,165.00

Rp. 204,870.00

Rp. 193,705.00

Rp. 28,165.00

Rp. 221,870.00

Page 79: Latihan RAB

Rp. 122,315.00

Rp. 28,165.00

Rp. 150,480.00

Rp. 536,765.00

Rp. 275,500.00

Rp. 812,265.00

Rp. 562,710.00

Rp. 275,500.00

Rp. 838,210.00

Page 80: Latihan RAB

Rp. 6,862.50

Rp. 613.50

Rp. 7,476.00

Rp. 2,383,925.00

22.22

0.6

13.3333333

Rp. 2,811,273.46 0.56

16.67 1.16 1.72

0.7 6.6666667

11.6666667

Rp. 2,677,234.00

0 0.52

0.3 5

44.44 13.332

Rp. 4,144,971.47

8.00

0.6

1.2 1.8

14.4

Rp. 2,966,166.00

0.6

Page 81: Latihan RAB

0.8

8.33 11.662

Rp. 3,804,764.20

Rp. 3,587,960.20

0.6

0.6

11.11 13.332

Rp. 3,841,972.47 1.12

0.3 0.26

0.6 0.9 0.56

12.50 11.25 0.82 6.6666667

Rp. 5,011,444.00

16.00

0.95 15.2

Rp. 3,814,566.87

1.26

16.00 20.1056

Rp. 2,546,868.48

0.3 0.26

0.5 0.8 0.56

0.00 0 0.82 6.6666667

Rp. 5,110,154.85

Page 82: Latihan RAB

50.00 0.36

0.8 0.76

0.2 1 1.12

7.6923077

Rp. 4,131,903.75

12.50 0.36

0.8 0.76

0.2 1 1.12

7.6923077

Rp. 4,460,847.75

0.2 0.36

0.6 0.56

10.00 8 0.92

Rp. 4,722,311.73

0.15 0.26

0.6 0.56

12.50 9.375 0.82

Rp. 4,894,914.47

Rp. 4,673,570.50

0.1

1.6

12.5 21.25

Rp. 4,695,581.38

22.22

0.375 8.3333333

Rp. 4,010,035.20

Page 83: Latihan RAB

0.2

0.8

12.5 12.5

Rp. 4,146,855.75

0.15

0.8

16.67 15.8365

Rp. 4,790,446.48

0.15

0.6

22.22 16.665

Rp. 4,962,198.47

0.15

0.4

33.33 18.3315

Rp. 5,083,005.11

8.33333333

Rp. 3,051,344.04

Rp. 3,133,580.04

Page 84: Latihan RAB

Rp. 3,514,105.00

1 M3 MEJA BETON DAPUR DAN PANTRY T. 10 CM (Besi Polos 102Kg) - BETON K-225 0.9996

Rp. 2,599,167.00

1 M3 PROFILAN BETON KUSEN JENDELA T. 10 CM DAN SUNSCREEN (Besi Polos 106 Kg) - BETON K-225

Rp. 2,731,301.13

0.195

0.3 0.49535.08771936.84210526

Rp. 2,460,103.74

8.33333333

Rp. 3,282,540.86

Rp. 2,861,914.00

Rp. 3,041,338.00

Rp. 2,452,462.00

Page 85: Latihan RAB

Rp. 69,860.00

Rp. 12,550.00

Rp. 82,410.00

Rp. 88,561.50

Rp. 25,100.00

Rp. 113,661.50

Rp. 76,075.00

Rp. 12,100.00

Rp. 88,175.00

Rp. 44,750.00

Page 86: Latihan RAB

Rp. 16,975.00

Rp. 61,725.00

Rp. 10,690.00

Rp. 13,850.00

Rp. 24,540.00

Rp. 16,275.00

Rp. 8,175.00

Rp. 24,450.00

Rp. 20,389.90

Page 87: Latihan RAB

Rp. 6,275.00

Rp. 26,664.90

Rp. 18,245.00

Rp. 4,425.00

Rp. 22,670.00

Rp. 530,000.00

Rp. 173,055.00

Rp. 703,055.00

Rp. 171,130.00

Rp. 193,000.00

Rp. 364,130.00

Page 88: Latihan RAB

Rp. 786,130.00

Rp. 90,500.00

Rp. 876,630.00

Rp. 493,330.00

Rp. 120,500.00

Rp. 613,830.00 0

Rp. 236,000.00

Rp. 219,700.00

Rp. 455,700.00

Rp. 229,763.25

Page 89: Latihan RAB

Rp. 121,140.00

Rp. 350,903.25

Rp. 25,252.08

Rp. 33,421.88

Rp. 7,785.00

Rp. 33,037.08

Rp. 41,206.88

Rp. 95,066.67

Rp. 43,077.08

Rp. 26,737.50

Rp. 9,857.50

Rp. 104,924.17

Rp. 52,934.58

Rp. 36,595.00

Rp. 15,135.00

Page 90: Latihan RAB

Rp. 5,650.00

Rp. 20,785.00

Rp. 12,500.00

Rp. 5,650.00

Rp. 18,150.00

Rp. 225,000.00

Rp. 32,550.00

Rp. 257,550.00

Rp. 6,000.00

Rp. 8,137.50

Rp. 14,137.50

Page 91: Latihan RAB

Rp. 27,125.00

Rp. 137,125.00

Rp. 187,125.00

Rp. 8,137.50

Rp. 90,362.50

Rp. 103,012.50

Rp. 27,500.00

Rp. 46,250.00

Rp. 73,750.00

Page 92: Latihan RAB

Rp. 55,439.00

Rp. 133,000.00

Rp. 188,439.00

Rp. 359,375.00

Rp. 90,035.00

Rp. 449,410.00

Rp. 16,986.30

Rp. 37,650.00

Rp. 54,636.30

HARGA

2005

### 8,500.00

### 10,500.00

### 550.00

### 1,550.00

### 6,100.00

### 1,100.00

### 1,600.00

### 5,500.00

Page 93: Latihan RAB

### 2,000.00

Rp. 65,644.30

### 785,000.00

### 22,000.00

### 500.00

Rp. 363,118.25

Rp. 296,500.00

Rp. 725,262.55

0.16 6.25

0.09 11.111111

Rp. 39,834.40

Rp. 40,875.00

Rp. 130,759.40

Rp. 123,259.40

Rp. 144,534.40

Page 94: Latihan RAB

0.03 33.3333330.05 200.09 11.111111

Rp. 35,964.00

Rp. 29,475.00

Rp. 105,639.00

Rp. 109,439.00

Rp. 107,989.00

0.02 50

Rp. 3,474.00

Rp. 7,920.00

Rp. 11,394.00

Rp. 11,394.00

Rp. 51,394.00

0 2.77777778

0 11.1111111

0 16.6666667

Rp. 50,767.00

Page 95: Latihan RAB

Rp. 40,875.00

Rp. 245,642.00

Rp. 662,842.00

Rp. 244,413.67

Rp. 20,600.00

Rp. 40,875.00

Rp. 113,975.00

Rp. 13,075.00

Rp. 10,560.00

Rp. 23,635.00

Rp. 8,500.00

Page 96: Latihan RAB

Rp. 6,362.50

Rp. 14,862.50

1 M2 Mengecat Bidang Kayu Baru (1x Plamur), 1x Cat Dasar Dan 2x Cat Penutup

Rp. 13,000.00

Rp. 3,310.00

Rp. 16,310.00

Rp. 6,775.00

Rp. 13,860.00

Rp. 4,006.50

Rp. 10,781.50

Rp. 17,866.50

Rp. 9,000.00

Rp. 3,226.00

Rp. 12,226.00

Page 97: Latihan RAB