Lampiran Drill Log 1.pdf

1
Proyek Kedalaman : Lokasi Muka Air Tanah : 4.50m Tanggal : 10 Juni 2014 Operator : Agus Muka Tanah :- 0.00 m 0.00 1.00 1.20 2.00 2.60 3.00 4.00 4.70 5.00 6.00 7.00 7.40 8.00 8.30 9.00 10.00 10.80 11.00 12.00 12.60 13.00 13.70 14.00 15.00 16.00 17.00 18.00 19.00 19.80 20.00 21.00 22.00 22.40 23.00 24.00 24.80 25.00 26.00 27.00 28.00 29.00 30.00 30.00 Akhir pengeboran 12-Jun-14 13-Jun-14 14-Jun-14 Geological Drill Log BM 1 N value (blow/ft) Depth (m) Relative densi Hard Rock/soil Description Column Section Thickness Soil / rock type Soil Spl Slightly : Jl. Parangtritis 120, Yogyakarta Depth (m) : Pembangunan Grand Paris Hotel Very Compact Slightly Loose Weak Highly Loose Moderately Completely 30 Care Recovery , % Very Hard Very Loose Medium Very Dense Medium Soil Loose Soft very Soft Consistency Very Stift Stift Very Weak Ground water level (m) SPT Dense Pasir Rock WeatheringCompactnees Hardnees Unweathered Compact Hard Moderately Medium 2.10 0.90 Pasir sedang berlanau, warna abu- abu coklat Pasir 1.20 Date Scale 10-Jun-14 11-Jun-14 Pasir sedang berlanau, warna coklat tua 6.10 Pasir sedang hingga kasar berlanau, warna hitam 1.40 Pasir halus hingga sedang berlanau, warna coklat kemerahan Pasir pasir 2.50 Pasir halus berlanau, warna abu- abu kehitaman Lanau Pasir 1.80 Pasir sedang hingga kasar berlanau, warna abu-abu kehitaman Pasir 1.10 Pasir halus berlanau, warna abu- abu kehitaman Pasir sedang berlanau, warna abu- abu kecoklatan Pasir 2.70 Lanau berpasir halus, warna abu- abu coklat terang Pasir Pasir sedang hingga kasar berlanau, warna abu-abu kehitaman Lanau 5.20 Lanau berpasir halus, warna coklat Pasir 2.60 Pasir 2.40 Pasir kasar berkerikil berlanau mengandung boulder, warna hitam 0 32 41 15 60 60 55 60 60 55 60 60 60 38 60 52 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 22.00 24.00 26.00 28.00 30.00 0 10 20 30 40 50 60 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 22.00 24.00 26.00 28.00 30.00 0 50 100

Transcript of Lampiran Drill Log 1.pdf

Page 1: Lampiran Drill Log 1.pdf

Proyek Kedalaman :

Lokasi Muka Air Tanah : 4.50m

Tanggal : 10 Juni 2014 Operator : Agus Muka Tanah :- 0.00 m

0.00

1.001.20

2.00

2.60

3.00

4.00

4.70

5.00

6.00

7.00

7.40

8.00

8.30

9.00

10.00

10.8011.00

12.00

12.60

13.00

13.7014.00

15.00

16.00

17.00

18.00

19.00

19.8020.00

21.00

22.00

22.40

23.00

24.00

24.8025.00

26.00

27.00

28.00

29.00

30.00 30.00

Akhir pengeboran

12-J

un-1

413-J

un-1

414-J

un-1

4

Geological Drill Log

BM 1

N value (blow/ft)

Depth

(m

)

Relative density

Hard

Rock/soil Description

Colu

mn

Section

Thic

knessSoil /

rock

type

Soil

Spl

Slig

htly

: Jl. Parangtritis 120, Yogyakarta

Depth

(m

)

: Pembangunan Grand Paris Hotel

Very

Com

pact

Slig

htly L

oose

Weak

Hig

hly

Loose

Modera

tely

Com

ple

tely

30

Care Recovery

, %

Very

Hard

Very

Loose

Mediu

m

Very

Dense

Mediu

m

Soil

Loose

Soft

very

Soft

Consistency

Very

Stift

Stift

Very

Weak

Gro

und w

ate

r le

vel (

m)

SPT

Dense

Pasir

Rock

WeatheringCompactnees Hardnees

Unw

eath

ere

d

Com

pact

Hard

Modera

tely

Mediu

m

2.10

0.90Pasir sedang berlanau, warna abu-

abu coklat

Pasir 1.20

Date

Scale

10-J

un-1

411-J

un-1

4

Pasir sedang berlanau, warna coklat

tua

6.10Pasir sedang hingga kasar

berlanau, warna hitam

1.40Pasir halus hingga sedang

berlanau, warna coklat kemerahan

Pasir

pasir 2.50Pasir halus berlanau, warna abu-

abu kehitaman

Lanau

Pasir

1.80Pasir sedang hingga kasar

berlanau, warna abu-abu kehitaman

Pasir 1.10Pasir halus berlanau, warna abu-

abu kehitaman

Pasir sedang berlanau, warna abu-

abu kecoklatan

Pasir 2.70Lanau berpasir halus, warna abu-

abu coklat terang

Pasir

Pasir sedang hingga kasar

berlanau, warna abu-abu

kehitaman

Lanau 5.20 Lanau berpasir halus, warna coklat

Pasir 2.60

Pasir 2.40

Pasir kasar berkerikil berlanau

mengandung boulder, warna hitam

0

32

41

15

60

60

55

60

60

55

60

60

60

38

60

52

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

18.00

20.00

22.00

24.00

26.00

28.00

30.00

0 10 20 30 40 50 60

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

18.00

20.00

22.00

24.00

26.00

28.00

30.00

0 50 100