KP Pertamina EP Tanjung

68
Presentasi Kerja Praktek PERTAMINA UBEP TANJUNG ASSET 5 ALDHI AULIA RACHIM (071.10.024) M RYAN LATUCONSINA (071.10.165) TRI SUDHARMA (071.10.277) ANDIKA MAHESA DEWANTARA (071.10.306) SYAHRINAL FAIZ (071.10.324)

description

tentang Petroleum Tanjung

Transcript of KP Pertamina EP Tanjung

Page 1: KP Pertamina EP Tanjung

Presentasi Kerja Praktek PERTAMINA UBEP TANJUNG ASSET 5

ALDHI AULIA RACHIM (071.10.024) M RYAN LATUCONSINA (071.10.165)

TRI SUDHARMA (071.10.277)ANDIKA MAHESA DEWANTARA (071.10.306)

SYAHRINAL FAIZ (071.10.324)

Page 2: KP Pertamina EP Tanjung

Pendahuluan

Security HSE

Induction

WO&WSProduction Operation

Petroleum Engineering

Outline

Page 3: KP Pertamina EP Tanjung

HSE DIVISION Pemberitahuan standar prosedur

keselamatan di lapangan atau disebut safety induction.

Overview Lapangan Tanjung

Day-1

Page 4: KP Pertamina EP Tanjung

Day-1

Page 5: KP Pertamina EP Tanjung

SECURITY CHECK KALKULASI DARI EFISIENSI POMPA SRPGUDANG 3

Day-2

Page 6: KP Pertamina EP Tanjung

SECURITY CHECK Day-2

Page 7: KP Pertamina EP Tanjung

Perhitungan Volume PlungerPerbandingan fluida yang terproduksi perday

dengan gross sumur tersebut untuk mendapatkan efisiensi pompa

Kalkulasi dari Efisiensi PumpJack

Day-2

Page 8: KP Pertamina EP Tanjung

WELL HEADWell head terbagi tiga jenis,yaitu:

1. Well Head Production2. Well Head Injection3. Well Head ESP

FISHING TOOL

GUDANG 3Day-2

Page 9: KP Pertamina EP Tanjung

Day-2

Wellhead

Page 10: KP Pertamina EP Tanjung

Fishing Tools sangat diperlukan dalam kegiatan pemboran sumur,karena Tools ini digunakan untuk memancing sebagian peralatanpemboran yang tertinggal di dalam sumur, sehingga kegiatan pemboran sumur bisa dilanjutkan kembali.

Day-2

Page 11: KP Pertamina EP Tanjung

Day-2

Penyebab utama terjadi Fish :1. Drill Bit sangat rusak, sehingga Cone tertinggal di dasar sumur.2. Drilling String terjepit / tersemen, sehingga Drilling String harus dipotong.3. Wireline Logging Tools terjepit.4. Casing collapse.5. Packer tidak bisa di – release.6. Bagian Handling Tools / Small Tools terjatuh ke dalam sumur.

Page 12: KP Pertamina EP Tanjung

Impression Block dibuat dari bahan timah yang dipasang padaujung Drilling String, dengan demikian kita dapat membuat tanda di permukaan Impression Block, sehingga kita dapat mengetahui posisi dan kondisi permukaan Fish di dalam sumur.

Day-2

Page 13: KP Pertamina EP Tanjung

Flat Mill digunakan untuk merapikan / merawat permukaandi bagian atas Fish, sehingga Fish bisa ditangkap dan dipancing olehFishing Tools.

Day-2

Page 14: KP Pertamina EP Tanjung

Casing Rollerdigunakan untuk memperbaiki permukaan di bagian dalam Fish( umumnya berupa Casing ),sehingga Casing bisa dipancingoleh Fishing Tools.

Day-2

Page 15: KP Pertamina EP Tanjung

Washover Shoe dan Washover Pipe digunakan untuk membersihkan guguran dinding sumur atau daerahjepitan di sekeliling bagian luar Fish, sehingga Fish bisa dicabut kepermukaan.

Day-2

Page 16: KP Pertamina EP Tanjung

16

Guide ShoeDigunakan untuk mengarahkanFishing Tools ke posisi Fish, sehinggaFish bisa ditangkap.

Day-2

Page 17: KP Pertamina EP Tanjung

17

Wall HookDigunakan untuk mengait Fishke posisi Fishing Tools, sehinggaFish bisa ditangkap oleh FishingTools.

Day-2

Page 18: KP Pertamina EP Tanjung

Overshot

Day-2

Page 19: KP Pertamina EP Tanjung

Overshot :Digunakan untuk menangkap Fish dari

luar.

Alat penangkapnya disebut Spiral

Grapple

dan Basket Grapple.

Spiral Grapple

Basket Grapple

Day-2

Page 20: KP Pertamina EP Tanjung

Day-2

Taper Tap digunakan untuk menangkap Fish dari dalam.

Page 21: KP Pertamina EP Tanjung

Casing Spear

Casing Spear digunakan untuk menangkap Fish dari dalam.

Day-2

Page 22: KP Pertamina EP Tanjung

Pada umumnya untuk mencabut Fish yang terjepit / tertanam di dalam sumur, sangat diperlukan tarikan bisa mencapai ratusan ton. Oleh karena itu diperlukan alat penggetar Fish agar bisa menggoyahkan / melonggarkan jepitan Fish, sehingga Fish bisa dicabut sampai ke permukaan.

Fishing Jar & Bumper Sub

Day-2

Page 23: KP Pertamina EP Tanjung

Internal Casing Cutter adalah alat pemotong Casing dari dalam Casing Body.

Day-2

Page 24: KP Pertamina EP Tanjung

Packer Ultra lock packer

Day-2

Page 25: KP Pertamina EP Tanjung

KUNJUNGAN KE RIG SERVICE : 1. TANJUNG 2. WARUKIN 3. TAPIAN

Day-3

Page 26: KP Pertamina EP Tanjung

Pada sumur T-133 dilakukan pergantian tubing dan pompa dengan menggunakan rig EPI-10

Pergantian dilakukan karena pada sumur tersebut banyak mengandung pasir di downhole motor yang menyebabkan fluida tidak dapat terproduksikan ke permukaan.

RIG SERVICE TANJUNGDay-3

Page 27: KP Pertamina EP Tanjung

Pada sumur WCF-021 sedang dilakukan penggantian pompa (pump replacement), karena sumur tersebut tidak berproduksi, maka dilakukan pengecekan untuk mencari kemungkinan-kemungkinan yang terjadi seperti pompa bocor atau dari valve yang bocor.

RIG SERVICE WARUKIN Day-3

Page 28: KP Pertamina EP Tanjung

RIG SERVICE TAPIANDay-3

Pada sumur T-24 sedang dilakukan pemasangan pump jack kemudian diteruskan dengan uji produksi. Rig yang sedang digunakan di sumur ini kemudian dipindahkan ke sumur K-2

Page 29: KP Pertamina EP Tanjung

Pada sumur K-2 ini sedang dalam proses persiapan fracturing dengan menggunakan jasa Schlumberger

SUMUR K-2Day-3

Page 30: KP Pertamina EP Tanjung

KUNJUNGAN KE PUMP SHOP SUCKER ROD PUMP

o RODo TUBING

ELECTRIC SUBMERGIBLE PUMPo CENTRILIFTo REDA

Day-4

Page 31: KP Pertamina EP Tanjung

KUNJUNGAN KE PUMP SHOPDay-4

Gas Anchor

Barel 2”

Intake Downhole Sensor

Page 32: KP Pertamina EP Tanjung

Day-4

RGS

Page 33: KP Pertamina EP Tanjung

Day-4

Rangkaian

Kabel round 4AWG

Discharge Pompa Reda

Protector/ Sealsection

Page 34: KP Pertamina EP Tanjung

SRP yang digunakan ada 2 jenis, yaitu:1. SRP Tubing ( Tubing Heavy Bottom Mechanical)2. SRP Rod ( Rod Well Anchor Cup )

SUCKER ROD PUMPDay-4

Page 35: KP Pertamina EP Tanjung

Day-4SUCKER ROD PUMP Downstroke : SV terbuka, TV tertutupUpstroke : SV tertutup, TV terbuka

Page 36: KP Pertamina EP Tanjung

ESP yang digunakan ada 2 jenis, yaitu:1. ESP Centrilift

400 series dan 500 series2. ESP Reda

400 series

ELECTRIC SUBMERGIBLE PUMP

Day-4

Page 37: KP Pertamina EP Tanjung

Day-4

Page 38: KP Pertamina EP Tanjung

Respace pump

Gas lock

Day-4

Page 39: KP Pertamina EP Tanjung

Pengukuran kehausan tubingDengan menggunakan kompressor yang melalui alat yang dimasukkan ke dalam tubing dan diukur setiap feet nya hingga berapa feet nya tubing untuk mendapat 1 barrel fluida.

Day-4

Page 40: KP Pertamina EP Tanjung

KUNJUNGAN KE SODYNA OFFICE SONOLOG DYNAGRAPH AMERADA

Day-5

Page 41: KP Pertamina EP Tanjung

Sonolog adalah suatu peralatan pengukur ketinggian cairan di dalam sumur dengan cara menembakan N2 lewat cashing valve menuju annulus.

Alatnya terdapat 2 jenis yaitu: 1. Digital 2. Manual

SONOLOGDay-5

Page 42: KP Pertamina EP Tanjung

Pengukuran fluid level bisa dilakukan dalam keadaan sumur statik atau dinamik.

Submergance didapat dari selisih kedalaman PSN dan kedalaman fluid level.

EchometerDay-5

Page 43: KP Pertamina EP Tanjung

Untuk mengetahui kinerja pompa di bawah permukaan

Mengetahui kebocoran pada valve (standing / traveling valve)

Mengetahui keseimbangan pumpjack dengan beban pompa bawah permukaan

Mengetahui SPM, SL

DynagraphDay-5

Page 44: KP Pertamina EP Tanjung

Merupakan pekerjaan mengukur tekanan dan temperatur lubang sumur.

AmeradaDay-5

Page 45: KP Pertamina EP Tanjung

PENGECEKAN FLUID LEVEL

PENGENALAN PROSES PRODUKSI TANJUNG-WARTAP

Day-6

Page 46: KP Pertamina EP Tanjung

SONOLOGDay-6

Page 47: KP Pertamina EP Tanjung

PENGENALAN PROSES PRODUKSI TANJUNG-WARTAP

Day-6

Page 48: KP Pertamina EP Tanjung

Day-6

Page 49: KP Pertamina EP Tanjung

KUNJUNGAN KE BS V

KUNJUNGAN KE SPU MANUNGGUL

Day-7

Page 50: KP Pertamina EP Tanjung

Kunjungan ke BS VDay-7

Page 51: KP Pertamina EP Tanjung

Kunjungan ke SP ManunggulDay-7

Page 52: KP Pertamina EP Tanjung

Day-7Kunjungan ke SP Manunggul

Page 53: KP Pertamina EP Tanjung

KUNJUNGAN KE BS III

KUNJUNGAN KE POWER PLANT

Day-8

Page 54: KP Pertamina EP Tanjung

Peralatan-peralatan pada BS 3 ini antara lain:

BLOCK STATION IIIDay-8

Page 55: KP Pertamina EP Tanjung

Sumur T-173Day-8

Page 56: KP Pertamina EP Tanjung

Sumur T-100Day-8

Page 57: KP Pertamina EP Tanjung

Sumber tenaga listrik di industri tanjung berasal dari gas yang terproduksikan dari sumur produksi dan dilakukan proses pembangkit listrik dari gas tersebut.

Turbin utama kapasitas 4MW, yang terdiri atas:2 Turbin Pertamina (170-190psi)1 Turbin sewa Turbomach (212-220psi)

POWER PLANTDay-8

Page 58: KP Pertamina EP Tanjung

Gas Kompressor terdapat 3 unit.o Ajax 1 (3 silinder) o Ajax 2 (2 silinder)o Ariel (12 silinder)o Thomasson 1 dan 2(6 silinder)

Pembangkit pembantu ada 5 buah, terdiri atas 2 gas engine dan 3 solar engine

Blackstar

Day-8

Page 59: KP Pertamina EP Tanjung

4 Booster: fresh water dan produce water

Waukesha engine digunakan untuk mendinginkan radiator

Air produce water dari manunggul dialirkan dengan pompa 55-60Mbpd menuju ke power plant lalu melewati booster dan diinjeksikan dengan pompa injeksi bertekanan tinggi dari power plant ke sumur-sumur injeksi. Kapasitas pompa 30MBPD/Pump

Day-8

Page 60: KP Pertamina EP Tanjung

Fresh water pump dialirkan maksimal 10hari/bulan ke manunggul untuk proses suspensi yang digunakan pada saat minyak dialirkan ke balikpapan.

Water intake kapasitas 60MBPD

Injeksi Clarifear digunakan untuk injeksi air bersoda abu dan tawas

Day-8

Page 61: KP Pertamina EP Tanjung

Clarified menggunakan Kaporit untuk menjernihkan air

Deaerator untuk mengikat oksigen agar air yang diinjeksikan tidak bersifat korosif

Valve Header mengatur kecepatan injeksi ke sumur di utara dan selatan power plant

Day-8

Page 62: KP Pertamina EP Tanjung

Ketersediaan gas bumiMemenuhi target produksi dari kantor pusat di

JakartaTetap memproduksikan minyak dengan hasil

yang tetap ekonomisZero discharge

Tantangan yang dihadapi Day-8

Page 63: KP Pertamina EP Tanjung

Masalah engineering di Lapangan TanjungMasalah engineering di Lapangan WarukinPenanggulangan masalah tersebutStimulasi Reservoir

Petroleum EngineeringDay-9

Page 64: KP Pertamina EP Tanjung

Untuk mengurangi beban tekanan yang tinggi di dalam jalur produksi akibat dari minyak yg mudah membeku maka dilakukan :

FL dan TL dipasang sandheaterBagian tikungan pada FL dan TL dibuat

longradiusBisa dilakukan treatment seperti mem flush

menggunakan air/hot water

Petroleum EngineeringDay-9

Page 65: KP Pertamina EP Tanjung

Kesimpulan

Page 66: KP Pertamina EP Tanjung
Page 67: KP Pertamina EP Tanjung

TERIMA KASIH

Page 68: KP Pertamina EP Tanjung

Pertamina Asset 5 UBEP Tanjung

Aboekasan,Widradjat ”Peralatan Bor” Trisakti, Jakarta

DAFTAR PUSTAKA