Ift Target Order Form
-
Upload
andi-yanuar -
Category
Documents
-
view
220 -
download
0
Transcript of Ift Target Order Form
-
8/10/2019 Ift Target Order Form
1/7
Date Recvd: GA Order No.: Rev. 0
Customer Order No.: Rev.
Lab Program Experimental Category Shipment Due Date - only one per form:
1 Target / Experiment ID
Best Efforts Facility:
PI name & phone #:
PI e-mail address:
QuantityTarget or Component
Descriptor
Shipment Due
DateQC GA revi
1st Shipment date
2nd Shipment date
3rd Shipment date
Questions that must be answered (Y/N), please provide more information if necessary: TARGET REQUEST ACCEPTANCE DATE BY GA:
1. Are alignment fibers or fiducials needed and specified ?
2. Are dimensions, tolerances, and units specified for all critical dimensions ?3. Is surface finish and/or material composition critical, has it been specified ?
4. Is the target sensitive to environmental conditions during fabrication or delivery ?
5. Are critical or non-standard characterization data needed and identified ? Customer Approval
6. Does target have special assembly needs ? Customer Name:
7. Does target need to be mounted ? Customer Approval Date:
Ship this order to:
Lab Coord:
*Enter other contact info if desired (people, cell #)
*Enter N/A when "not applicable"
*Indicate number of days if multiple days in a shot
series
No Best Effort specifications required
Special
needs
Detailed description or comments (assembly, characterization, etc.)
General Atomics Target Request Form
Total number of pages in this request form:
Please fill in this worksheet to submit a target request to General Atomics. Attach extra sheets if necessary. (Shaded boxes for GA use only) v.5.4d
Shot Date - if multiple, enter first day:
-
8/10/2019 Ift Target Order Form
2/7
C1 Rev. 0Capsule Specifications
GA Order No. Customer Order No.
W/O No.
Comments
Item
Quantity
ID (m)
Inner layer (m)
2nd layer (m)
3rd layer (m)
4th layer (m)
Total wall (m)
OD(m)
Fill(atm)
-
8/10/2019 Ift Target Order Form
3/7
D1 Rev. 0
-
8/10/2019 Ift Target Order Form
4/7
D2 Rev. 0
-
8/10/2019 Ift Target Order Form
5/7
D3 Rev. 0
-
8/10/2019 Ift Target Order Form
6/7
Required Measurement M1 Rev. 0GA Order No.: Rev. 0
Customer Order No. Rev.Delivered Parts
No.
DWG
Grid
Location
Specification
NameValue Tol 1 2 3 4 5 6 7
1 0
2 0
3 0
4 0
5 0
6 0
7 0
8 0
9 0
10 0
-
8/10/2019 Ift Target Order Form
7/7