ASOSIASI KONTRAKTOR LISTRIK DAN MEKANIKAL INDONESIA ANALISA HARGA SATUAN JASA PEMASANGAN INSTALASI LISTRIK

NO

JENIS PEKERJAAN

HARGA SATUAN (Rp.) 3

BIAYA (Rp.)

JUMLAH DIBULATKAN (Rp.) 5

1

2 DASAR UPAH - Pekerja (pembantu tukang) upah minim - Tukang - Kepala Tukang - Mandor - Teknisi - Supervisi - Tenaga Ahli (Expert) 1 PEKERJA Upah 1 hari Transfort 1 hari Uang Makan 1 hari

4

17250 8000 7000

17250 8000 7000 32250

32250 32250

2 TUKANG Upah 1 hari Transfort 1 hari Uang Makan 1 hari

24500 8000 8000

24500 8000 8000 40500

40500 40500

3 TEKNISI Upah 1 hari Transfort 1 hari Uang Makan 1 hari

38250 8000 10000

38250 8000 10000 56250

56250

56250 56250

4 TENAGA AHLI MUDA Upah 1 hari Transfort 1 hari Uang Makan 1 hari

93500 15000 15000

93500 15000 15000 123500

123500 123500

5 SUPERVISI Upah 1 hari Transfort 1 hari Uang Makan 1 hari

139750 15000 20000

139750 15000 20000 174750

168750 174750 168750

ASOSIASI KONTRAKTOR LISTRIK DAN MEKANIKAL INDONESIA ANALISA HARGA SATUAN PEKERJAAN PEMASANGAN INSTALASI GARDU Belum termasuk resiko,over head,keuntungan 10 % dan PPN 10 % 2004 HARGA NO 1 1a JENIS PEKERJAAN 2 1.1 Pemasangan kubikel LBS/PT/B1 - Tenaga Ahli Muda 0.38 Hari 2 Tukang 2 Pekerja - Pengadaan/Pemasangan Angkur 4 Buah 1.2 Pemasangan Kubikel PGDB/PGDT - Tenaga Ahli Muda 0.50 Hari 4 Tukang 2 Pekerja - Pengadaan/Pemasangan Angkur 3 Buah 1.3 Pemasangan SACO - Tenaga Ahli Muda 0.50 Hari 4 Tukang 2 Pekerja - Pengadaan/Pemasangan Angkur 4 Buah 123,500 40,500 32,250 3,738 61,750.00 162,000.00 64,500.00 14,952.00 303,202.00 1.4 Pemasangan RMU.3 dan 4 Terminal(Panel Kontrol UPD) - Tenaga Ahli Muda 0.50 Hari 4 Tukang 1 Pekerja - Pengadaan/Pemasangan Angkur 4 Buah 123,500 40,500 32,250 3,738 61,750.00 162,000.00 32,250.00 14,952.00 270,952.00 1.5 Pemasangan RMU ( LBS,LBS,PB) ( Beton,Kiosk,Portal) - Tenaga Ahli Muda 0.50 Hari 4 Tukang 2 Pekerja - Pengadaan/Pemasangan Angkur 4 Buah 123,500 40,500 32,250 3,738 61,750.00 162,000.00 64,500.00 14,952.00 303,202.00 1.6 Pemasangan ( Peletakan ke posisi sebenarnya ) Trafo 100 kVA s/d 315 KVA - Tenaga Ahli Muda 0.38 Hari 2 Tukang 3 Pekerja 123,500 40,500 32,250 46,312.50 81,000.00 96,750.00 224,062.50 1.7 Pemasangan ( Peletakan ke posisi sebenarnya )Trafo 400 kVA s/d 630 kVA - Tenaga Ahli Muda 0.38 Hari 2 Tukang 5 Pekerja 123,500 40,500 32,250 46,312.50 81,000.00 161,250.00 288,562.50 288,560.00 224,060.00 303,200.00 270,950.00 303,200.00 123,500 40,500 32,250 3,738 61,750.00 162,000.00 64,500.00 11,214.00 299,464.00 299,460.00 123,500 40,500 32,250 3,738 46,312.50 81,000.00 64,500.00 14,952.00 206,764.50 206,760.00 SATUAN ( Rupiah ) 3 4 PEKERJAAN PEMASANGAN INSTALASI GARDU BIAYA ( Rupiah ) JUMLAH DIBULATKAN ( Rupiah ) 5

1.8 Pemasangan ( Peletakan ke posisi sebenarnya )Trafo 1.000 kVA s/d 1.250 KVA

- Tenaga Ahli Muda

0.38 Hari 2 Tukang 8 Pekerja

123,500 40,500 32,250

46,312.50 81,000.00 258,000.00 385,312.50 385,310.00

1.9 Pemasangan ( Peletakan ke posisi sebenarnya )Trafo 1.600 kVA s/d 2.000 KVA - Tenaga Ahli Muda 0.38 Hari 2 Tukang 12 Pekerja 1.10 Bracket (Kabel Tray) dan Grounding - Tenaga Ahli Muda 0.25 Hari 2 Tukang 1.11 Rak TR 4 Jurusan - Tenaga Ahli Muda 0.13 Hari 2 Tukang 1.12 Rak TR 6 & 8 Jurusan - Tenaga Ahli Muda 0.13 Hari 2 Tukang 1 Pekerja 1.13 123,500 40,500 32,250 15,437.50 81,000.00 32,250.00 128,687.50 Pemasangan LBS untuk Gardu Beton Open Type - Tenaga Ahli Muda 0.38 Hari 2 Tukang - Pengadaan/Pemasangan angkur 4 Pekerja 1.14 L.V.C.B Outdoor untuk gardu CANTOL - Tenaga Ahli Muda 0.13 Hari 2 Tukang 1.15 L.V.S.B Outdoor untuk gardu Portal - Tenaga Ahli Muda 0.13 Hari 2 Tukang 3 Pekerja 1.16 Single Core TM 3 x ( 1x 25 mm2 ) di MV Cell - Tenaga Ahli Muda 0.67 Hari 0.67 Tukang 0.33 Pekerja 1.17 Single Core TM 3 x ( 1x 25 mm2 ) di Trafo - Tenaga Ahli Muda 0.67 Hari 0.67 Tukang 0.33 Pekerja 1.18 Single Core TR 7 x ( 1x 240 mm2 ) di Trafo - Tenaga Ahli Muda 0.25 Hari 0.13 Tukang 0.13 Pekerja 1.19 Single Core TR 7 x ( 1x 240 mm2 ) di TR 123,500 40,500 32,250 30,875.00 5,062.50 4,031.25 39,968.75 39,960.00 123,500 40,500 32,250 82,333.33 27,000.00 10,750.00 120,083.33 120,080.00 123,500 40,500 32,250 82,333.33 27,000.00 10,750.00 120,083.33 120,080.00 123,500 40,500 32,250 15,437.50 81,000.00 96,750.00 193,187.50 193,180.00 123,500 40,500 15,437.50 81,000.00 96,437.50 96,430.00 123,500 40,500 32,250 46,312.50 81,000.00 129,000.00 256,312.50 256,310.00 128,680.00 123,500 40,500 32,250 15,437.50 81,000.00 96,437.50 96,430.00 123,500 40,500 32,250 30,875.00 81,000.00 111,875.00 111,870.00 123,500 40,500 32,250 46,312.50 81,000.00 387,000.00 514,312.50 514,310.00

- Tenaga Ahli Muda

0.25 Hari 0.13 Tukang 0.13 Pekerja

123,500 40,500 32,250

30,875.00 5,062.50 4,031.25 39,968.75 39,960.00

1.20

Pengadaan Penyangga Kabel TM 20 kV - Tenaga Ahli Muda 0.13 Hari 1 Tukang 2 Pekerja - Pengad/Pemas Besi U 85x45x6 mm 1 Meter - Pengad/Pemas Klem Besi Buah 1 123,500 40,500 32,250 15,600 1,950 15,437.50 40,500.00 64,500.00 15,600.00 1,950.00 137,987.50 137,980.00

1.21

IndikatormGangguan Tanah/GFD - Tenaga Ahli Muda 0.13 Hari 2 Tukang 123,500 40,500 15,437.50 81,000.00 96,437.50 96,430.00

1.22

Pemasangan Instalasi Heater Kubikel - Tenaga Ahli Muda 0.13 Hari 1 Tukang 123,500 40,500 2,210 26,250 37,500 26,250 15,437.50 40,500.00 55,937.50 55,930.00 2,210.00 52,500.00 2,210.00 52,500.00 75,000.00 52,500.00 127,500.00 127,500.00

1.23 1.24 1.25

Pengadaan Kabel Heater Kubikel 1 Meter Pembersihan Ruangan Gardu 2 Pekerja Bantuan Tenaga untuk Pengujian 2 Tukang Pengopersian 2 Pekerja

1.b

PEKERJAAN PEMBONGKARAN INSTALASI GARDU 1 No: 1 s/d 19 sama dengan Pekerjaan Pemasangan 2 Pembongkaran Terminal Indoor 20 KV di Cubikel 1 Pekerja 26,250 26,250 26,250.00

II

PEMASANGAN APP TYPE KHUSUS IB,IC DAN IIF 2.1 Dengan Pondasi - Galian tanah biasa/rumput m3 pondasi 0.13 untk - Pasang Batu Bata - Pasang Angkur - Pasang Fisher - Acian Beton 0.26 m3 4 Buah 4 Buah 2.27 m2 3 Tukang - Jasa Pelaksanan Listrik Hari 0.13 2 Tukang 2.2 Dengan Strain Hook - Pasang Strain Hook - Tenaga Ahli Muda 4 Buah 0.13 Hari 1 Tukang 2 Pekerja 6,500 123,500 40,500 32,250 26,000.00 15,437.50 40,500.00 64,500.00 146,437.50 146,430.00 20,386 201,578 3,738 1,430 10,777 4,420 123,500 40,500 123,500 40,500 2,650.18 52,410.28 14,952.00 5,720.00 24,463.79 10,033.40 61,750.00 121,500.00 16,055.00 81,000.00 390,534.65 390,530.00

- Plesteran 1 PC: 2 Ps ( tebal 15 mm) 2.27 m2 - Jasa Pelaksanaan Sipil0.5 Hari

III

PEKERJAAN PEMELIHARAAN INSTALASI GARDU 3.1 Kubikel TM - Tenaga Ahli Muda - Tukang - Majun 0.13 Hari 2 Tukang 0.5 Kg 123,500 40,500 8,000 15,437.50 81,000.00 4,000.00

- YC.8513 ( Minyak Pembersih ) 0.5 Liter - Pasline Putih Type G.658 SFG 0.25 Kg 3.2 Kubikel pengukuran ( PGDB ) - Tenaga Ahli Muda - Tukang - Majun 0.13 Hari 2 Tukang 0.5 Kg

75,000 87,500

37,500.00 21,875.00 159,812.50 159,810.00

123,500 40,500 8,000 75,000 87,500

15,437.50 81,000.00 4,000.00 37,500.00 21,875.00 159,812.50 159,810.00

- YC.8513 ( Minyak Pembersih ) 0.5 Liter - Pasline Putih Type G.658 SFG 0.25 Kg 3.3 Trafo Distribusi - Tenaga Ahli Muda - Tukang - Majun 0.13 Hari 2 Tukang 0.5 Kg

123,500 40,500 8,000 75,000

15,437.50 81,000.00 4,000.00 37,500.00 137,937.50 137,930.00

- YC.8513 ( Minyak Pembersih ) 0.5 Liter 3.4 Rak TR - Tenaga Ahli Muda - Tukang - Majun 0.13 Hari 1 Tukang 0.25 Kg

123,500 40,500 8,000 75,000 87,500

15,437.50 40,500.00 2,000.00 37,500.00 21,875.00 117,312.50 117,310.00

- YC.8513 ( Minyak Pembersih ) 0.5 Liter - Pasline Putih Type G.658 SFG 0.25 Kg 3.5 Detektor gangguan tanah/GFD - Tukang 1 Tukang

40,500 75,000

40,500.00 37,500.00 78,000.00 78,000.00

- YC.8513 ( Minyak Pembersih ) 0.5 Kg 3.6 Pembersihan Ruangan Gardu - Alat Vacum Cleaner - Bahan Bakar/Olie - Instalator IV 4.1 a b c d e f g h i j k PEKERJAAN LAIN - LAIN Pemasangan Gardu Besi/Kios berikut Pondasi Pekerjaan Persiapan Pasang Bouplank Urugan Pasir Padat 1 Lokasi 17 Meter 0.5 m3 1 Buah 1 Liter 1 Tukang

13,000 2,600 40,500

13,000.00 2,600.00 40,500.00 56,100.00 56,100.00

130,000 8,398 20,386 49,842 689,193 130,000 10,738 4,420 2,925 23,375

130,000.00 142,766.00 183,474.00 24,921.00 3,170,287.80 520,000.00 375,830.00 154,700.00 29,250.00 140,250.00

Galian Tanah Biasa/Rumputm3 9 Pondasi Beton Tulang 1:2:3 m3 4.6 Pantek Pipa Arde Komplit 4 Batang Plesteran 1:2 Acian Beton 35 m2 35 m2

Pasang Arde Keliling Pondasi 10 Kg Beton Lantai Kerja 1:2:3 6 m2 Pekerjaan Stel Kios - Pelaksana 1 Ten.Ahl.Md 2 Tukang 3 Pekerja

123,500 40,500 32,250 21,125

123,500.00 81,000.00 96,750.00 190,125.00 5,362,853.80 5,362,850.00

l

Pembuangan tanah keluar9lokasi M3 Angkutan Truk dengan Kap.3.m3

2 Pemasangan Gardu Kios Compact berikut Pondasi

a b c d e f g h i j k

Pekerjaan Persiapan Pasang Bouplank Urugan Pasir Padat

1 Lokasi 9 Meter 0.25 m3

130,000 8,398 7,878 49,842 689,193 130,000 10,738 4,420 2,925 23,375 123,500 40,500 32,250 112,500

130,000.00 75,582.00 35,451.00 12,460.50 1,585,143.90 520,000.00 193,284.00 79,560.00 29,250.00 70,125.00 123,500.00 81,000.00 193,500.00 98,437.50 0.00 3,227,293.90 3,227,290.00 39,000,000.00 650,000.00 43,225,000.00 650,000.00

Galian Tanah Biasa/Rumputm3 4.5 Pondasi Beton Tulang 1:2:3 m3 2.3 Pantek Pipa Arde Komplit 4 Batang Plesteran 1:2 Acian Beton 18 m2 18 m2

Pasang Arde Keliling Pondasi 10 Kg Beton Lantai Kerja 1:2:3 3 m2 Pekerjaan Stel Kios - Pelaksana 1 Ten.Ahl.Md 2 Tukang 6 Pekerja

l m

Sewa Mobil Crane

0.88 Hari

Pembuangan tanah keluar lokasi 4.5 Rit Angkutan Truk dengan Kap.3 m3

3 Pengadaan Gardu Susun GRC 400 KVA Kososng (1,5x2,5x3,9)m dan saluran kabel GRC 630 KVA Kosong (1,5x2,5x4,2) 4 Pengadaan Gardu Susun GRC 400 KVA Kososng (1,5x2,5x3,9)m dan saluran kabel GRC 630 KVA Kosong (1,5x2,5x4,2)

ASOSIASI KONTRAKTOR LISTRIK DAN MEKANIKAL INDONESIA ANALISA HARGA SATUAN PEKERJAAN SALURAN KABEL TEGANGAN RENDAH Belum termasuk resiko, over head, keuntungan 10 % dan PPN 10 % 2004 HARGA NO. 1 1. 1.1 a. URAIAN PEKERJAAN 2 PEKERJAAN GALIAN, URUGAN DAN PEMADATAN GALIAN URUGAN DAN PEMADATAN PADA TANAH BIASA / TANAH RUMPUT 1 s/d 2 jalur ( 1,00 x 0,40 x 0,80 ) b. GALIAN TANAH BIASA/TN.RUMPUT = 0.32 m3 URUGAN TANAH BIASA/TN.RUMPUT m3 = 0.24 PEMADATAN= 0.40 m2 20,386.15 9,464.00 3,713.30 6,523.57 2,271.36 1,485.32 10,280.25 3 Jalur (1,00 x 0,50 x 0,80 ) c. GALIAN TANAH BIASA/TN.RUMPUT = 0.40 m3 URUGAN TANAH BIASA/TN.RUMPUT m3 = 0.30 PEMADATAN= 0.50 m2 20,386.15 9,464.00 3,713.30 8,154.46 2,839.20 1,856.65 12,850.31 4 Jalur (1,00 x 0,65 x 0,80 ) d. GALIAN TANAH BIASA/TN.RUMPUT = 0.52 m3 URUGAN TANAH BIASA/TN.RUMPUT m3 = 0.39 PEMADATAN= 0.65 m2 20,386.15 9,464.00 3,713.30 10,600.80 3,690.96 2,413.65 16,705.40 GALIAN PENYUNTIKAN KABEL PADA TANAH BIASA/TN.RUMPUT (1,50 x 0,50 x 0,80 ) e. GALIAN TANAH BIASA/TN.RUMPUT = 0.60 m3 URUGAN TANAH BIASA/TN.RUMPUT m3 = 0.45 PEMADATAN= 0.75 m2 20,386.15 9,464.00 3,713.30 12,231.69 4,258.80 2,784.98 19,275.47 GALIAN LUBANG SAMBUNGAN PADA TANAH BIASA/TN.RUMPUT ( 1 s/d 2 Jalur = 1,50 X 0,50 X 0,80 ) f. GALIAN TANAH BIASA/TN.RUMPUT = 0.72 m3 URUGAN TANAH BIASA/TN.RUMPUT m3 = 0.45 PEMADATAN= 0.75 m2 20,386.15 9,464.00 3,713.30 14,678.03 4,258.80 2,784.98 21,721.80 GALIAN LUBANG SAMBUNGAN PADA TANAH BIASA/TANAH RUMPUT ( 3 s/d 4 Jalur = 1,50 X 0,85 X 0,80 ) g. GALIAN TANAH BIASA/TN.RUMPUT = 1.02 m3 URUGAN TANAH BIASA/TN.RUMPUT m3 = 0.77 PEMADATAN= 1.28 m2 20,386.15 9,464.00 3,713.30 20,793.87 7,239.96 4,734.46 32,768.29 GALIAN LUBANG PENGEBORAN MANUAL PADA TANAH BIASA/TANAH RUMPUT (2,00 X 1,50 X 3,00 ) SATUAN (RUPIAH) 3 JUMLAH BIAYA (RUPIAH) 4 JUMLAH DIBULATKAN (RUPIAH) 5

Catatan :

HS SAMA DENGAN HS SKTM

0.00

- Rp. 20.386,15 -HS.Sipil Hal.2-No.02 - Rp. 9.464, -HS.DKI Hal.2-TN.10 - Rp. 3.713,3 = 2xRp.1068-HS.DKI Hal.3 TN.24 1.2. a. GALIAN URUGAN DAN PEMADATAN PADA TANAH KERAS / TANAH KORAL 1 s/d 2 jalur ( 1,00 x 0,40 x 0,80 ) b. GALIAN TANAH KERAS / KORAL = PEMADATAN= 0.32 m3 0.40 m2 24,233.23 9,464.00 3,713.30 7,754.63 2,271.36 1,485.32 11,511.31 3 jalur ( 1,00 x 0,50 x 0,80 ) c. GALIAN TANAH KERAS / KORAL = PEMADATAN= 0.40 m3 0.50 m2 24,233.23 9,464.00 3,713.30 9,693.29 2,839.20 1,856.65 14,389.14 4 jalur ( 1,00 x 0,65 x 0,80 ) d. GALIAN TANAH KERAS / KORAL = PEMADATAN= 0.52 m3 0.65 m2 24,233.23 9,464.00 3,713.30 12,601.28 3,690.96 2,413.65 18,705.88 GALIAN PENYUNTIKAN KABEL PADA TANAH KERAS / KORAL e. GALIAN TANAH KERAS / KORAL = PEMADATAN= 0.60 m3 0.75 m2 24,233.23 9,464.00 3,713.30 14,539.94 4,258.80 2,784.98 21,583.71 GALIAN LUBANG SAMBUNGAN PADA TANAH KERAS / KORAL ( 1 s/d 2 jalur = 1,50 x 0,60 x 0,80 ) f. GALIAN TANAH KERAS / KORAL = PEMADATAN= 0.72 m3 0.90 m2 24,233.23 9,464.00 3,713.30 17,447.93 5,110.56 3,341.97 25,900.46 GALIAN LUBANG SAMBUNGAN PADA TANAH KERAS / KORAL ( 3 s/d 4 jalur = 1,50 x 0,85 x 0,80 ) g. GALIAN TANAH KERAS / KORAL = PEMADATAN= 1.02 m3 1.28 m2 24,233.23 9,464.00 3,713.30 24,717.89 7,239.96 4,734.46 36,692.31 GALIAN LUBANG PENGEBORAN MANUAL PADA TANAH KERAS / KORAL ( 2,00 x 1,50 x 3,00 ) Catatan : - Rp. 24.233,23 HS.Sipil Hal.1 No.06 HS SAMA DENGAN HS SKTM 0.00 URUGAN TANAH KERAS / KORAL 0.77 m3 = URUGAN TANAH KERAS / KORAL 0.54 m3 = URUGAN TANAH KERAS / KORAL 0.45 m3 = URUGAN TANAH KERAS / KORAL 0.39 m3 = URUGAN TANAH KERAS / KORAL 0.30 m3 = URUGAN TANAH KERAS / KORAL 0.24 m3 =

1.3. a.

GALIAN URUGAN DAN PEMADATAN PADA CONBLOK / INTERBLOK 1 s/d 2 jalur ( 1,00 x 0,40 x 0,80 ) BONGKAR CONBLOK / INTERBLOK0.60 m2 = GALIAN TANAH KERAS = URUGAN TANAH KERAS = PEMADATAN= 0.30 m3 0.16 m3 0.40 m2 1,600.20 24,233.23 9,464.00 3,713.30 960.12 7,173.04 1,514.24 1,485.32 11,132.72

b.

3 jalur ( 1,00 x 0,50 x 0,80 ) BONGKAR CONBLOK / INTERBLOK0.70 m2 = GALIAN TANAH KERAS = URUGAN TANAH KERAS = PEMADATAN= 0.37 m3 0.20 m3 0.50 m2 1,600.20 24,233.23 9,464.00 3,713.30 1,120.14 8,966.30 1,892.80 1,856.65 13,835.89

c.

4 jalur ( 1,00 x 0,65 x 0,80 ) BONGKAR CONBLOK / INTERBLOK0.85 m2 = GALIAN TANAH KERAS = URUGAN TANAH KERAS = PEMADATAN= 0.48 m3 0.26 m3 0.65 m2 1,600.20 24,233.23 9,464.00 3,713.30 1,360.17 11,656.18 2,460.64 2,413.65 17,890.64

d.

GALIAN PENYUNTIKAN KABEL PADA CONBLOK / INTERBLOK ( 1,50 X 0,50 X 0,80 ) BONGKAR CONBLOK / INTERBLOK1.05 m2 = GALIAN TANAH KERAS = URUGAN TANAH KERAS = PEMADATAN= 0.56 m3 0.30 m3 0.75 m2 1,600.20 24,233.23 9,464.00 3,713.30 1,680.21 13,449.44 2,839.20 2,784.98 20,753.83

e.

GALIAN LUBANG SAMBUNGAN PADA CONBLOK / INTERBLOK ( 1,50 X 0,60 X 0,80 ) ( 1 s/d 2 jalur = 1,50 x 0,60 x 0,80 ) BONGKAR CONBLOK / INTERBLOK1.20 m2 = GALIAN TANAH KERAS = URUGAN TANAH KERAS = PEMADATAN= 0.67 m3 0.36 m3 0.90 m2 1,600.20 24,233.23 9,464.00 3,713.30 1,920.24 16,139.33 3,407.04 3,341.97 24,808.58

f.

GALIAN LUBANG SAMBUNGAN PADA CONBLOK / INTERBLOK ( 1,50 X 0,85 X 0,80 ) ( 3 s/d 4 jalur = 1,50 x 0,85 x 0,80 ) BONGKAR CONBLOK / INTERBLOK1.58 m2 = GALIAN TANAH KERAS = URUGAN TANAH KERAS = PEMADATAN= 0.94 m3 0.51 m3 1.28 m2 1,600.20 24,233.23 9,464.00 3,713.30 2,520.32 22,864.05 4,826.64 4,734.46 34,945.47

g.

GALIAN LUBANG PENGEBORAN MANUAL PADA CONBLOK / INTERBLOK ( 1,50 X 0,85 X 0,80 ) ( 2,00 x 1,50 x 3,00 ) Catatan : - Rp. 1.600,2 --HS DKI Hal.38 BKR.59 Pekerjaan Bongkar di tambah 10 Cm kiri dan kanan dari lebar galian HS SAMA DENGAN HS SKTM 0.00

1.4. a.

GALIAN URUGAN DAN PEMADATAN PADA UBIN BADAK / KERAMIK / FLOOR BETON BIASA 1 s/d 2 jalur ( 1,00 x 0,40 x 0,80 ) BONGKAR U.BADAK / F.BETON BIASA m2 = 0.60 GALIAN TANAH KERAS = URUGAN TANAH KERAS = PEMADATAN= 0.29 m3 0.17 m3 0.40 m2 1,600.20 24,233.23 9,464.00 3,713.30 960.12 6,979.17 1,571.02 1,485.32 10,995.63

b.

3 jalur ( 1,00 x 0,50 x 0,80 ) BONGKAR U.BADAK / F.BETON BIASA m2 = 0.70 GALIAN TANAH KERAS = URUGAN TANAH KERAS = PEMADATAN= 0.36 m3 0.21 m3 0.50 m2 1,600.20 24,233.23 9,464.00 3,713.30 1,120.14 8,723.96 1,987.44 1,856.65 13,688.19

c.

4 jalur ( 1,00 x 0,65 x 0,80 ) BONGKAR U.BADAK / F.BETON BIASA m2 = 0.85 GALIAN TANAH KERAS = URUGAN TANAH KERAS = PEMADATAN= 0.47 m3 0.27 m3 0.65 m2 1,600.20 24,233.23 9,464.00 3,713.30 1,360.17 11,341.15 2,583.67 2,413.65 17,698.64

d.

GALIAN PENYUNTIKAN KABEL PADA UBIN BADAK / F.BETON BIASA ( 1,50 X 0,50 X 0,80 ) BONGKAR U.BADAK / F.BETON BIASA m2 = 1.05 GALIAN TANAH KERAS = URUGAN TANAH KERAS = PEMADATAN= 0.54 m3 0.32 m3 0.75 m2 1,600.20 24,233.23 9,464.00 3,713.30 1,680.21 13,085.94 2,981.16 2,784.98 20,532.29

e.

GALIAN LUBANG SAMBUNGAN PADA UBIN BADAK / F.BETON BIASA ( 1 s/d 2 jalur = 1,50 x 0,60 x 0,80 ) BONGKAR U.BADAK / F.BETON BIASA m2 = 1.20 GALIAN TANAH KERAS = URUGAN TANAH KERAS = PEMADATAN= 0.65 m3 0.38 m3 0.90 m2 1,600.20 24,233.23 9,464.00 3,713.30 1,920.24 15,703.13 3,577.39 3,341.97 24,542.74

f.

GALIAN LUBANG SAMBUNGAN PADA UBIN BADAK / F.BETON BIASA ( 3 s/d 4 jalur = 1,50 x 0,85 x 0,80 ) BONGKAR U.BADAK / F.BETON BIASA m2 = 1.78 GALIAN TANAH KERAS = URUGAN TANAH KERAS = PEMADATAN= 0.92 m3 0.54 m3 1.28 m2 1,600.20 24,233.23 9,464.00 3,713.30 2,840.36 22,246.11 5,067.97 4,734.46 34,888.89

g.

GALIAN LUBANG PENGEBORAN MANUAL PADA UBIN BADAK / F.BETON BIASA ( 2,00 x 1,50 x 3,00 ) HS SAMA DENGAN HARGA SKTM Catatan : Pekerjaan Bongkar di tambah 10 Cm kiri dan kanan dari lebar galian 0.00

1.5.

GALIAN URUGAN DAN PEMADATAN PADA FLOOR BETON COR

a.

1 s/d 2 jalur ( 1,00 x 0,40 x 0,80 ) BONGKAR FLOOR BETON COR = GALIAN TANAH KERAS = URUGAN TANAH KERAS = PEMADATAN= 0.04 m2 0.29 m3 0.15 m3 0.40 m2 212,815.30 24,233.23 9,464.00 3,713.30 8,938.24 7,076.10 1,438.53 1,485.32 18,938.19

b.

3 jalur ( 1,00 x 0,50 x 0,80 ) BONGKAR FLOOR BETON COR = GALIAN TANAH KERAS = URUGAN TANAH KERAS = PEMADATAN= 0.05 m2 0.37 m3 0.19 m3 0.50 m2 212,815.30 24,233.23 9,464.00 3,713.30 10,427.95 8,845.13 1,798.16 1,856.65 22,927.89

c.

4 jalur ( 1,00 x 0,65 x 0,80 ) BONGKAR FLOOR BETON COR = GALIAN TANAH KERAS = URUGAN TANAH KERAS = PEMADATAN= 0.60 m2 0.47 m3 0.25 m3 0.75 m2 212,815.30 24,233.23 9,464.00 3,713.30 126,625.10 11,498.67 2,337.61 2,784.98 143,246.35

d.

GALIAN PENYUNTIKAN KABEL PADA FLOOR BETON COR ( 1,50 x 0,50 x 0,80 ) BONGKAR FLOOR BETON COR = GALIAN TANAH KERAS = URUGAN TANAH KERAS = PEMADATAN= 0.07 m2 0.55 m3 0.29 m3 0.75 m2 212,815.30 24,233.23 9,464.00 3,713.30 15,641.92 13,267.69 2,697.24 2,784.98 34,391.83

e.

GALIAN LUBANG SAMBUNGAN PADA FLOOR BETON COR ( 1 s/d 2 jalur = 1,50 x 0,60 x 0,80 ) BONGKAR FLOOR BETON COR = GALIAN TANAH KERAS = URUGAN TANAH KERAS = PEMADATAN= 1.08 m2 0.66 m3 0.34 m3 0.90 m2 212,815.30 24,233.23 9,464.00 3,713.30 230,691.79 15,921.23 3,236.69 3,341.97 253,191.68

f.

GALIAN LUBANG SAMBUNGAN PADA FLOOR BETON COR ( 3 s/d 4 jalur = 1,50 x 0,85 x 0,80 ) BONGKAR FLOOR BETON COR = GALIAN TANAH KERAS = URUGAN TANAH KERAS = PEMADATAN= 0.11 m2 0.93 m3 0.48 m3 1.28 m2 212,815.30 24,233.23 9,464.00 3,713.30 23,409.68 22,553.87 4,585.31 4,734.46 55,283.32

g.

GALIAN LUBANG PENGEBORAN MANUAL PADA FLOOR BETON COR ( 2,00 x 1,50 x 3,00 ) HS SAMA DENGAN HARGA SKTM Catatan : - Rp. 212.815,30-- HS.DKI hAL.33 - bkr.03 Pekerjaan Bongkar di tambah 10 Cm kiri dan kanan dari lebar galian 0.00

1.6. a.

GALIAN URUGAN DAN PEMADATAN PADA FLOOR BETON BERTULANG 1 s/d 2 jalur ( 1,00 x 0,40 x 0,80 )

b.

BONGKAR FLOOR BETON BERTULANGm2 = 0.01 GALIAN TANAH KERAS = URUGAN TANAH KERAS = PEMADATAN= 0.28 m3 0.16 m3 0.40 m2

295,701.25 24,233.23 9,464.00 3,713.30

1,774.21 6,785.30 1,514.24 1,485.32 11,559.07

3 jalur ( 1,00 x 0,50 x 0,80 ) BONGKAR FLOOR BETON BERTULANGm2 = 0.01 GALIAN TANAH KERAS = URUGAN TANAH KERAS = PEMADATAN= 0.35 m3 0.20 m3 0.50 m2 295,701.25 24,233.23 9,464.00 3,713.30 2,069.91 8,481.63 1,892.80 1,856.65 14,300.99

c.

4 jalur ( 1,00 x 0,65 x 0,80 ) BONGKAR FLOOR BETON BERTULANGm2 = 0.09 GALIAN TANAH KERAS = URUGAN TANAH KERAS = PEMADATAN= 0.46 m3 0.26 m3 0.65 m2 295,701.25 24,233.23 9,464.00 3,713.30 25,134.61 11,026.12 2,460.64 2,413.65 41,035.01

d.

GALIAN PENYUNTIKAN KABEL PADA FLOOR BETON BERTULANG ( 1,50 x 0,50 x 0,80 ) BONGKAR FLOOR BETON BERTULANGm2 = 1.11 GALIAN TANAH KERAS = URUGAN TANAH KERAS = PEMADATAN= 0.53 m3 0.30 m3 0.75 m2 295,701.25 24,233.23 9,464.00 3,713.30 326,749.88 12,722.45 2,839.20 2,784.98 345,096.50

e.

GALIAN LUBANG SAMBUNGAN PADA FLOOR BETON BERTULANG ( 1 s/d 2 jalur = 1,50 x 0,60 x 0,80 ) BONGKAR FLOOR BETON BERTULANGm2 = 1.12 GALIAN TANAH KERAS = URUGAN TANAH KERAS = PEMADATAN= 0.63 m3 0.36 m3 0.90 m2 295,701.25 24,233.23 9,464.00 3,713.30 331,185.40 15,266.93 3,407.04 3,341.97 353,201.34

f.

GALIAN LUBANG SAMBUNGAN PADA FLOOR BETON BERTULANG ( 3 s/d 4 jalur = 1,50 x 0,85 x 0,80 ) BONGKAR FLOOR BETON BERTULANGm2 = 0.16 GALIAN TANAH KERAS = URUGAN TANAH KERAS = PEMADATAN= 0.89 m3 0.51 m3 1.28 m2 295,701.25 24,233.23 9,464.00 3,713.30 46,572.95 21,628.16 4,826.64 4,734.46 77,762.20

g.

GALIAN LUBANG PENGEBORAN MANUAL PADA FLOOR BETON BERTULANG ( 2,00 x 1,50 x 3,00 ) HS SAMA DENGAN HARGA SKTM Catatan : - Rp. 295.701.25,- - HS.SIPIL Hal.36 - BKR.04 Pekerjaan Bongkar di tambah 10 Cm kiri dan kanan dari lebar galian 0.00

1.7. a.

GALIAN URUGAN DAN PEMADATAN PADA A S P A L / H O T M I X 1 s/d 2 jalur ( 1,00 x 0,40 x 0,80 ) BONGKAR ASPAL / HOTMIX = 0.40 m2 11,766.92 4,706.77

b.

GALIAN TANAH BERBATU =

0.30 m3

40,751.00

12,225.30 16,932.07

3 jalur ( 1,00 x 0,50 x 0,80 ) BONGKAR ASPAL / HOTMIX = GALIAN TANAH BERBATU = 0.50 m2 0.38 m3 11,766.92 40,751.00 5,883.46 15,281.63 21,165.09

c.

4 jalur ( 1,00 x 0,65 x 0,80 ) BONGKAR ASPAL / HOTMIX = GALIAN TANAH BERBATU = 0.65 m2 0.49 m3 11,766.92 40,751.00 7,648.50 19,866.11 27,514.61

d.

GALIAN PENYUNTIKAN KABEL PADA ASPAL / HOTMIX ( 1,50 x 0,50 x 080 ) BONGKAR ASPAL / HOTMIX = GALIAN TANAH BERBATU = 0.75 m2 0.56 m3 11,766.92 40,751.00 8,825.19 22,922.44 31,747.63

e.

GALIAN LUBANG SAMBUNGAN PADA ASPAL / HOTMIX ( 1 s/d 2 jalur = 1,50 x 0,60 x 0,80 ) BONGKAR ASPAL / HOTMIX = GALIAN TANAH BERBATU = 0.90 m2 0.68 m3 11,766.92 40,751.00 10,590.23 27,506.93 38,097.15

f.

GALIAN LUBANG SAMBUNGAN PADA ASPAL / HOTMIX ( 3 s/d 4 jalur = 1,50 x 0,85 x 0,80 ) BONGKAR ASPAL / HOTMIX = GALIAN TANAH BERBATU = 1.28 m2 0.96 m3 11,766.92 40,751.00 15,002.82 38,966.11 53,968.93

g.

GALIAN LUBANG PENGEBORAN MANUAL PADA ASPAL / HOTMIX HS SAMA DENGAN HS SKTM

1.8.

POMPONGAN Catatan : - Rp.11.766.92,- - HS.DKI Hal.36 - BRK.07 - Rp.40.751,- - HS Sipil Hal.2 No.07 Pekerja 0.33 Pekerja 32,250.00 10,750.00 10,750.00

2 2.1.

PENARIKAN , PENYAMBUNGAN DAN TERMINASI KABEL Penarikan Kabel 4 x 16 S/D 50 mm2 Gelar Kabel / hari = 750 meter Teknisi Mandor Pekerja 1.00 orang 1.00 Mandor 65.00 Pekerja 123,500.00 56,250.00 32,250.00 123,500.00 56,250.00 2,096,250.00 2,276,000.00 750 3,034.67 1.00 Orang 1.00 Orang 65.00 Pekerja 123,500.00 56,250.00 32,250.00 123,500.00 56,250.00 2,096,250.00 2,276,000.00 600.00 3,034.67

Rp.3.575,- --HS DKI Hal.33--BKR-09 2.2. Penarikan Kabel 4 x 70 s/d 150 mm2 Gelar Kabel / hari = 600 meter Tenaga Ahli Muda Teknisi Pekerja

3,793.33 2.3. Penyambungan Kabel 2.4. Tenaga Ahli Muda Tukang / Instalator Pekerja 0.25 Orang 1.00 Tuk./ Ins 1.00 Pekerja 123,500.00 40,500.00 32,250.00 30,875.00 40,500.00 32,250.00

3,793.33

103,625.00 Terminasi Kabel Indoor 2.5. Tenaga Ahli Muda Tukang / Instalator Pekerja 0.25 Orang 1.00 Tuk./ Ins 1.00 Pekerja 123,500.00 40,500.00 32,250.00 30,875.00 40,500.00 32,250.00 103,625.00 Terminasi Kabel Outdoor 3. Tenaga Ahli Muda Tukang / Instalator Pekerja 0.25 Orang 1.00 Tuk./ Ins 2.00 Pekerja 123,500.00 40,500.00 32,250.00 30,875.00 40,500.00 64,500.00 135,875.00 MATERIAL PELENGKAP BERIKUT PEMASANGAN Catatan : Rp. 5.107 = Rp.572.000,- (Harga Papan / M3) 4 x 28 lembar papan / M3 4. 4.1. PENGEBORAN / CROSSING Pengeboran dgn menggunakan Bor Manual/Hari dapat 8 M Teknisi Tukang Kayu Pekerja (12 + 9) x 2 = 21 x 2 = 42 x 0,03 = Dolken 5/7 Paku = = 1.00 Orang 1.00 T.kayu 5.00 Pekerja 1.26 M3 12.00 Batang 1.00 Kg 56,250.00 40,500.00 32,250.00 572,000.00 3,250.00 2,600.00 56,250.00 40,500.00 161,250.00 258,000.00 720,720.00 39,000.00 2,600.00 1,020,320.00 8.00 4.2. 5 5.1. 5.2. 5.3. 5.4. 5.5. 5.6. 5.7. 5.8. Pengeboran dengan menggunakan Mesin Khusus PERBAIKAN BEKAS GALIAN ( BERIKUT MATERIAL ) T.Biasa/T.Rumput (perbaikan/pemadatan sudah termasuk dlm pek galian) T.Keras/Koral (perbaikan/pemadatan sudah termasuk dlm pek galian) Conblok (Interblok) / M2 Ubin Badak Floor Beton Biasa Floor Beton Cor Floor Beton Bertulang Shat Sheet 22,697.00 26,707.00 14,053.00 26,083.00 75,200.00 10,920.00 22,700.00 26,710.00 14,050.00 26,080.00 75,200.00 10,920.00 Sesuai Kontrak 127,540.00 127,540.00 Keramik Tanda Peringatan Kabel PLN Ukuran (22,5 x 30 x 4) Cm - Sertifikat LMK Batu Merah Pasir Urug Darat Buis Beton O 20 Cm Papan Penahan Tanah PVC O 4" type AW 137.00 49,959.00 11,102.00 5,107.00 20,215.00 140.00 49,960.00 11,100.00 5,110.00 20,220.00 845.00 850.00

Papan penahan tanah (2x3x2) + (3x1,5x2)x2x0,03 =

5.9.

Aspal Biasa / Penetrasi Penetrasi tebal 5 Cm Macadam tebal 20 Cm Sirtu Tebal 30 Cm 13,314.00 17,186.00 16,190.00 13,314.00 17,186.00 16,190.00 46,690.00 46,690.00

5.10.

Aspal Hotmix 3/5/20/32 Hotmix tebal 3 Cm Tack Coating Penetrasi tebal 5 Cm Macadam 20 Cm Sirtu 32 Cm 12,517.00 3,188.00 13,314.00 17,186.00 16,190.00 12,517.00 3,188.00 13,314.00 17,186.00 16,190.00 62,395.00 62,390.00

5.11.

Aspal Hotmix 5/5/20/28 Hotmix tebal 5 Cm Tack Coating Penetrasi tebal 5 Cm Macadam 20 Cm Sirtu 32 Cm = 32/30 20,744.00 3,188.00 13,314.00 17,186.00 16,190.00 20,744.00 3,188.00 13,314.00 17,186.00 16,190.00 70,622.00 70,620.00

5.12.

Aspal Hotmix 7/5/20/28 Hotmix tebal 7 Cm Tack Coating Penetrasi tebal 5 Cm Macadam 20 Cm Sirtu 28 Cm = 28/30 28,972.00 3,188.00 13,314.00 17,186.00 16,190.00 28,972.00 3,188.00 13,314.00 17,186.00 16,190.00 78,850.00 78,850.00 38,000.00 40,740.00 43,470.00

5.13.

Perbaikan Keramik Pasang Keramik 10 x 20 Pasang Keramik 20 x 20 Pasang Keramik 30 x 20 1.00 m2 1.00 m2 1.00 m2 37,999.00 40,742.00 33,440.00

5.14.

Perbaikan rumput disesuaikan dgn HS DKI/Pertanaman ( Dalam bestek biaya perbaikan rumput/taman tidak dicantumkan dan akan dibayar sesuai realisasi berdasarkan bukti yang dapat dipertanggung jawabkan ).

7880 - Rp. 3.713,3 = 2xRp.1068-HS.DKI Hal.3 TN.24 2140 - Rp. 20.386,15 -HS.Sipil Hal.2-No.02 - Rp. 9.464, -HS.DKI Hal.2-TN.10

2136 7878 3445

3445 - Rp. 11.139,9 =6xRp.1068-HS.DKI HAl.3 TN.24 4408.24 - Rp. 30.579,- (300/200)x7878 HS. Sipil Hal.2 No.02 11817

- Rp.11.766.92,- - HS.DKI Hal.36 - BRK.07 - Rp.40.751,- - HS Sipil Hal.2 No.07 - Rp. 1.856.65 - HS.DKI Hal.3 TN.24

0

21093.75

42187.5

ASOSIASI KONTRAKTOR LISTRIK DAN MEKANIKAL INDONESIA ANALISA HARGA SATUAN PEKERJAAN : SUTR DAN SAMBUNGAN LISTRIK Belum Termasuk resiko, over head, keuntungan 10 % dan PPN 10 % 2004 HARGA NO. 1 1 1.1 JENIS PEKERJAAN 2 PENANAMAN TIANG BESI 9 METER Tiang Besi 9 meter 200 daN - Pengeboran Tanah/ 0.33333333 Mandor Mendirikan Tiang 1.66666667 Tukang 1.2 Tiang Besi 9 meter 350 daN - Pengeboran Tanah/ 0.33333333 Mandor Mendirikan Tiang 1.3 2 Tukang 56,250.00 40,500.00 18,750.00 81,000.00 99,750.00 Tiang Besi 9 meter 500 daN - Pengeboran Tanah/ 0.33333333 Mandor Mendirikan Tiang 1.4 2 Tukang 56,250.00 40,500.00 18,750.00 81,000.00 99,750.00 Tiang Besi 9 meter 800 daN - Pengeboran Tanah/ 0.33333333 Mandor Mendirikan Tiang 2.66666667 Tukang 1.5 Tiang Besi 9 meter 1.200 daN - Pengeboran Tanah/ 0.33333333 Mandor Mendirikan Tiang 3.33333333 Tukang 2 2.1 2.2 2.3 2.4 2.5 3 3.1 PENGECATAN TIANG BESI 9 METER Tiang Besi 9 meter 200 daN 3.175 m2 Tiang Besi 9 meter 350 daN 3.954 m2 Tiang Besi 9 meter 500 daN 4.376 m2 Tiang Besi 9 meter 800 daN 5.506 m2 Tiang Besi 9 meter 1.200 daN 6.423 m2 PENANAMAN TIANG BETON 9 METER Tiang Beton 9 meter 200 daN - Pengeboran Tanah/ 0.33333333 Mandor Mendirikan Tiang 2.66666667 Tukang 3.2 Tiang beton 9 meter 350 daN - Pengeboran Tanah/ 0.33333333 Mandor Mendirikan Tiang 3.33333333 Tukang 3.3 Tiang beton 9 meter 500 daN - Pengeboran Tanah/ Mendirikan Tiang 0.5 Mandor 4 Tukang 56,250.00 40,500.00 28,125.00 162,000.00 190,125.00 0.5 4 56,250.00 40,500.00 18,750.00 135,000.00 153,750.00 0.33333333 3.33333333 56,250.00 40,500.00 18,750.00 108,000.00 126,750.00 0.33333333 2.66666667 10,257.00 10,257.00 10,257.00 10,257.00 10,257.00 32,566.00 40,556.00 44,885.00 56,475.00 65,881.00 32,570.00 40,560.00 44,890.00 56,480.00 65,890.00 56,250.00 40,500.00 18,750.00 135,000.00 153,750.00 0.33333333 3.33333333 56,250.00 40,500.00 18,750.00 108,000.00 126,750.00 0.33333333 2.66666667 0.33333333 2 0.33333333 2 56,250.00 40,500.00 18,750.00 67,500.00 86,250.00 0.33333333 1.66666667 SATUAN (RUPIAH) 3 (RUPIAH) 4 BIAYA JUMLAH DIBULATKAN (RUPIAH) 5

3.4

Tiang beton 9 meter 800 daN - Pengeboran Tanah/ Mendirikan Tiang 0.5 Mandor 4.5 Tukang 56,250.00 40,500.00 28,125.00 182,250.00 210,375.00 0.5 4.5

3.5

Tiang beton 9 meter 1.200 daN - Pengeboran Tanah/ Mendirikan Tiang 0.5 Mandor 5 Tukang 56,250.00 40,500.00 28,125.00 202,500.00 230,625.00 0.5 5

4 4.1

PEMBUATAN PONDASI TIANG BESI/BETON 9 METER Pondasi Tiang 9 meter Type A - Galian Tanah biasa/rumput 0.60 m3 - Sirtu dipadatkan m3 0.60 - Beton Block 0.03 m3 1:2:3 - Urugan Pasir 0.03 m3 7,878.00 89,842.00 687,193.00 49,842.00 47,268.00 29,905.00 20,616.00 1,495.00 99,280.00

4.2

Ponsdasi Tiang 9 meter Type B - Galian Tanah biasa/rumput 0.50 m3 - Beton Tumbuk 1:2:3 0.38 m3 - Beton Block 0.03 m3 1:2:3 - Urugan Pasir 0.03 m3 7,878.00 216,242.00 687,193.00 49,842.00 3,939.00 82,172.00 20,616.00 1,495.00 108,220.00

4.3

Pondasi Tiang 9 meter Type C - Galian Tanah biasa/rumput 0.60 m3 - Beton Tumbuk 1:2:3 0.54 m3 - Beton Block 0.03 m3 1:2:3 - Urugan Pasir 0.03 m3 7,878.00 216,242.00 687,193.00 49,842.00 4,727.00 116,771.00 20,616.00 1,495.00 143,610.00

4.4

Pondasi Tiang 9 meter Type D - Galian Tanah biasa/rumput 0.50 m3 - Beton Tumbuk 1:2:3 0.38 m3 - Beton Block 0.10 m3 1:2:3 - Urugan Pasir 0.03 m3 7,878.00 216,242.00 687,193.00 49,842.00 3,939.00 82,172.00 68,719.00 1,495.00 156,330.00

4.5

Pondasi Tiang 9 meter Type E - Galian Tanah biasa/rumput 0.60 m3 - Beton Tumbuk 1:2:3 0.54 m3 - Beton Block 0.20 m3 1:2:3 - Urugan Pasir 0.03 m3 7,878.00 216,242.00 687,193.00 49,842.00 4,727.00 116,771.00 137,439.00 1,495.00 260,430.00

5 5.1

PEMASANGAN/PERBAIKAN KUTR Pemasangan KUTR 4 Kawat BC 25/50 mm2 - Penarikan KUTR 1 Gawang 0.5 Mandor 2 Tukang 1.5 Pekerja 56,250.00 40,500.00 32,250.00 28,125.00 81,000.00 48,375.00 157,500.00

5.2

Pemasangan Twisted Cable 3 x 35 s/d 70 mm2 + N - Penarikan KUTR 1 Gawang 0.33333333 Mandor 1.33333333 Tukang 1.33333333 Pekerja 56,250.00 40,500.00 32,250.00 18,750.00 54,000.00 43,000.00 115,750.00

5.3

Pemasangan SL 1 Phase Twisted/Kawat Udara - Sambungan Rumah (SR) Mandor 0.25 56,250.00 14,062.50

1 Tukang 5.4

40,500.00

40,500.00 54,562.50

Pemasangan SL 3 Phase Twisted/Kawat Udara - Sambungan Rumah (SR) Mandor 0.5 1 Tukang 56,250.00 40,500.00 28,125.00 40,500.00 68,625.00

5.5 5.6 5.7

Perbaikan KUTR Kendor BC pasang Sama dengan Perbaikan KUTR Kendor Twisted Sama dengan pasang 0.125 Mandor 0.125 Tukang

157,500.00 115,750.00 56,250.00 40,500.00

157,500.00 115,750.00 7,031.25 5,062.50

157,500.00 115,750.00

Pemasangan / Montage Joint Sleve Uk.35 s/d 70 mm2 Set (4 Bh)

12,093.75 5.8 Pemasangan / Montage Conector Uk.35 s/d 70 mm2 Set (4 Bh) 0.0625 Mandor 0.125 Tukang 5.9 56,250.00 40,500.00 3,515.63 5,062.50 8,578.13 Pemasangan / Perbaikan Jumper SUTR/Phase (Buah) - Mandor Pengawas 0.08333333 Mandor - Tukang - Pekerja 5.10 0.08333333 Tukang 0.08333333 Pekerja 56,250.00 40,500.00 32,250.00 4,687.50 3,375.00 2,687.50 10,750.00 Pemasangan Suspension Assemby (Set) - Mandor Pengawas 0.08333333 Mandor - Tukang - Pekerja 5.11 0.25 Tukang 0.5 Pekerja 56,250.00 40,500.00 32,250.00 4,687.50 10,125.00 16,125.00 30,937.50 Pemasangan Dead End Essembly (Set) - Mandor Pengawas 0.08333333 Mandor - Tukang - Pekerja 5.12 0.33333333 Tukang 0.66666667 Pekerja 56,250.00 40,500.00 32,250.00 4,687.50 13,500.00 21,500.00 39,687.50 Pemasangan Pelindung Listrik & Mekanik (Bundle end Protection) - Mandor Pengawas 0.08333333 Mandor - Tukang - Pekerja 5.13 0.25 Tukang 0.5 Pekerja 56,250.00 40,500.00 32,250.00 4,687.50 10,125.00 16,125.00 30,937.50 Pemasangan/Penanaman Pipa Arde (1,5 inc per 1,5 mtr) perbatang 0.25 Pemasangan Pengadaan pipa Arde (1.5 inc per 1,5 m) 0.25 Pemasangan 5.14 26,000.00 50,718.00 6,500.00 12,680.00 19,180.00 Pemasangan Pipa Arde (1,5 inc) & (6) pengikat (3) dipipa (3) dikabel 0.25 Mandor 0.5 Tukang 5.15 56,250.00 40,500.00 14,062.50 20,250.00 34,312.50 Pemasangan Pipa Opstyg (2,5) & (6) pengikat (3) dipipa (3) dikabel 0.25 Mandor 0.5 Tukang 56,250.00 40,500.00 14,062.50 20,250.00 34,312.50 6 PERBAIKAN PONDASI DAN TIANG MIRING 9 METER ( BESI DAN BETON )

6.1

Pondasi Tiang 9 meter Type A - Galian tanah0.42 m3 biasa/rumput - Sirtu dipadatkan m3 0.42 7,878.00 49,842.00 3,309.00 20,934.00 24,240.00

6.2

Pondasi Tiang 9 meter Type B - Galian tanah0.35 m3 biasa/rumput - Beton tumbuk 1:2:3 0.27 m3 7,878.00 216,242.00 2,727.00 58,385.00 61,140.00

6.3

Pondasi Tiang 9 meter Type C - Galian tanah0.42 m3 biasa/rumput - Beton tumbuk 1:2:3 0.38 m3 7,878.00 216,242.00 3,309.00 82,172.00 85,480.00

6.4

Pondasi Tiang 9 meter Type D - Galian tanah0.35 m3 biasa/rumput - Beton tumbuk 1:2:3 0.27 m3 7,878.00 216,242.00 2,752.00 58,385.00 61,143.00

6.5

Pondasi Tiang 9 meter Type E - Galian tanah0.42 m3 biasa/rumput - Beton tumbuk 1:2:3 0.38 m3 7,878.00 216,242.00 3,309.00 82,172.00 85,480.00

7 7.1 7.2 7.3 7.4 7.5 7.6 7.7 7.8

PEMBONGKARAN TIANG BESI Pembongkaran Tiang Besi 9/200 daN Sama Dengan Pasang Pembongkaran Tiang Besi 9/350 daN Sama Dengan Pasang Pembongkaran Tiang Besi 9/500 daN Sama Dengan Pasang Pembongkaran Tiang Besi 9/800 daN Sama Dengan Pasang Pembongkaran Tiang Besi 9/1200 daN Sama Dengan Pasang 86,250.00 99,750.00 99,750.00 126,750.00 153,750.00 86,250.00 99,750.00 99,750.00 126,750.00 153,750.00 86,250.00 99,750.00 99,750.00 126,750.00 153,750.00 86,250.00 6,500.00

Pembongkaran Drak Skur sama dengan pasang Tiang Besi86,250.00 86,250.00 9/200 Pembongkaran Drak Skur sama dengan pasang arde KUTR 1 / 4 Pemasangan26,000.00 Bongkar Pasang Box SKTR Panel Utama 1 Mandor 1 Tukang 1 Pekerja 56,250.00 40,500.00 32,250.00 56,250.00 40,500.00 32,250.00 56,250.00 40,500.00 32,250.00 6,500.00

129,000.00 7.9 Panel Pembagi 0.5 Mandor 1 Tukang 1 Pekerja 8 8.1 8.2 8.3 8.4 8.5 9 9.1 9.2 9.3 PEMBONGKARAN TIANG BETON Pembongkaran Tiang Beton 9/200 daN Sama Dengan Pasang Pembongkaran Tiang Beton 9/350 daN Sama Dengan Pasang Pembongkaran Tiang Beton 9/500 daN Sama Dengan Pasang Pembongkaran Tiang Beton 9/800 daN Sama Dengan Pasang Pembongkaran Tiang Beton 9/1200 daN Sama Dengan Pasang PEMBONGKARAN KUTR Kawat Udara 4 kawat BC 25/50 mm2 Sama Dengan Pasang Twisted kabel Sama Dengan Pasang 3 x 35 s/d 70 mm2 + N Pembongkaran Travers SUTR 0.08333333 Mandor 8 Tukang 10 PERBAIKAN LISTRIK (SL) 157,500.00 115,750.00 56,250.00 40,500.00 157,500.00 115,750.00 4,687.50 324,000.00 328,687.50 157,500.00 115,750.00 126,750.00 153,750.00 190,125.00 210,375.00 230,625.00 126,750.00 153,750.00 190,125.00 210,375.00 230,625.00 126,750.00 153,750.00 190,125.00 210,375.00 230,625.00 28,125.00 40,500.00 32,250.00 100,875.00

10.1 10.2 11 11.1 11.2 11.3

SL 1 Phase Twisted / Kawat Udara 0.50 Pasang SL 3 Phase Twisted / Kawat Udara 0.50 Pasang

18,644.00 24,375.00

9,347.00 12,188.00

9,350.00 12,190.00

PEMBONGKARAN 7 REHABILITASI SAMBUNGAN LISTRIK SL SL 1 Phase Twisted / Kawat 1 Pasang Udara SL 3 Phase Twisted / Kawat 1 Pasang Udara - Pelaksana 1 / 2 Pasang 18,694.00 24,375.00 18,694.00 18,694.00 24,375.00 9,347.00 18,690.00 24,380.00 9,350.00

Rehabilitasi SL 1 Phase akibat penggeseran tiang

12 12.1

PEKERJAAN LAIN - LAIN Menyetel KWH meter 1 phase pada tutup OK.I & memasang MCB - Mandor Pengawas 0.04545455 Mandor - Tukang 0.27272727 Tukang 53,250.00 37,500.00 2,420.45 10,227.27 12,647.73

12.2

Menyetel KWH meter 3 phase pada tutup OK.III & memasang MCB 1 0.2 Mandor 0.4 Tukang 56,250.00 40,500.00 11,250.00 16,200.00 27,450.00

12.3

Pemasangan APP Type Khusus I A - Pelaksana 0.5 Mandor 1 Tukang 56,250.00 40,500.00 28,125.00 40,500.00 68,625.00

12.4

Pemasangan Box TR - Galian Pondasi tanah biasa / rumput 0.41 m3 - Pondasi Batu Merah m3 0.135 - Pelaksana 0.5 Mandor 1 Tukang 7,878.00 201,578.00 56,250.00 40,500.00 3,230.00 27,213.00 28,125.00 40,500.00 99,068.00

12.5

Potong Cabang pohon dengan minimal dari hantaran - Pekerjaan Penebangan Mandor 0.33333333 1 Tukang 1 Pekerja 56,250.00 40,500.00 32,250.00 18,750.00 40,500.00 32,250.00 91,500.00

ASOSIASI KONTRAKTOR LISTRIK DAN MEKANIKAL INDONESIA ANALISA HARGA SATUAN PEKERJAAN SALURAN KABEL TEGANGAN MENENGAH Biaya belum termasuk resiko,overhead,keuntungan 10% dan PPN 10% 2004 HARGA NO 01 I 1 URAIAN PEKERJAAN 02 PEKERJAAN GALIAN-URUGAN DAN PEMADATAN TANAH BIASA/TANAH RUMPUT a 1 dan 2 jalur (1,00 x0,50 x 1,30 ) - Galian Tanah biasa/Rumput = - Urugan Tanah Biasa/rumput = - Pemadatan = b 3 Jalur (1,00 x 0,60 x1,20) - Galian Tanah biasa/Rumput = - Urugan Tanah Biasa/rumput = - Pemadatan = c 4 Jalur (1,00 x 0,80 x1,20) - Galian Tanah biasa/Rumput = - Urugan Tanah Biasa/rumput = - Pemadatan = d 5 dan 6 Jalur (1,00 x 0,60 x1,40) - Galian Tanah biasa/Rumput = - Urugan Tanah Biasa/rumput = - Pemadatan = e 7 dan 8 Jalur (1,00 x 0,80 x1,40) - Galian Tanah biasa/Rumput = - Urugan Tanah Biasa/rumput = - Pemadatan = f 9 dan 10 Jalur (1,00 x 1,00 x1,40) - Galian Tanah biasa/Rumput = - Urugan Tanah Biasa/rumput = - Pemadatan = g 11 dan 12 Jalur (1,00 x 1,00 x1,40) - Galian Tanah biasa/Rumput = - Urugan Tanah Biasa/rumput = - Pemadatan = 1.66 m3 0.2 m3 0.2 m2 20,386.15 9,464.00 3,713.30 33,841.01 1,892.80 742.66 36,476.47 h 13,14 dan 15 Jalur (1,00 x 1,00 x 1,60) - Galian Tanah biasa/Rumput = 1.6 m3 20,386.15 32,617.84 36,476 1.4 m3 1 m3 1 m2 20,386.15 9,464.00 3,713.30 28,540.61 9,464.00 3,713.30 41,717.91 41,718 1.12 m3 0.8 m3 0.8 m2 20,386.15 9,464.00 3,713.30 22,832.49 7,571.20 2,970.64 33,374.33 33,374 0.84 m3 0.6 m3 0.6 m2 20,386.15 9,464.00 3,713.30 17,124.37 5,678.40 2,227.98 25,030.75 25,031 0.96 m3 0.8 m3 0.8 m2 20,386.15 9,464.00 3,713.30 19,570.70 7,571.20 2,970.64 30,112.54 30,113 0.72 m3 0.6 m3 0.6 m2 20,386.15 9,464.00 3,713.30 14,678.03 5,678.40 2,227.98 22,584.41 22,584 0.65 m3 0.4 m3 0.4 m2 20,386.15 9,464.00 3,713.30 13,251.00 3,785.60 1,485.32 18,521.92 18,522 SATUAN (Rp.) 03 JUMLAH BIAYA (Rp.) 04 JUMLAH DIBULATKAN (Rp.) 05

- Urugan Tanah Biasa/rumput = - Pemadatan = i Penyuntikan Kabel (1,50 x 0,50 x 1,10 ) - Galian Tanah biasa/Rumput = - Urugan Tanah Biasa/rumput = - Pemadatan =

1 m3 1 m2

9,464.00 3,713.30

9,464.00 3,713.30 45,795.14 45,795

0.825 m3 0.75 m3 0.75 m2

20,386.15 9,464.00 3,713.30

16,818.57 7,098.00 2,784.98 26,701.55 26,702

j Galian Lub.Sambungan 1 s/d 2 jalur(2,00x1,30x1,20) - Galian Tanah biasa/Rumput = - Urugan Tanah Biasa/rumput = - Pemadatan = 3.12 m3 2.6 m3 2.6 m2 20,386.15 9,464.00 3,713.30 63,604.79 24,606.40 9,654.58 97,865.77 k Galian Lub.Pengeboran Manual (2,00 x 1,50 x 3,00) - Galian Tanah biasa/Rumput = - Urugan Tanah Biasa/rumput = - Pemadatan = Catatan : - Rp. 3.713,3 = 2xRp.1068-HS.DKI Hal.3 TN.24 - Rp. 11.139,9 =6xRp.1068-HS.DKI HAl.3 TN.24 - Rp. 20.386,15 -HS.Sipil Hal.2-No.02 - Rp. 30.579,- (300/200)x7878 HS. Sipil Hal.2 No.02 - Rp. 9.464, -HS.DKI Hal.2-TN.10 2 TANAH KERAS/TANAH KORAL a 1 dan 2 Jalur (1,00x0,50x1,30) - Galian Tanah Keras/Koral = - Urugan Tanah Keras/Koral = - Pemadatan = b 3 Jalur (1,00x0,60x1,20) - Galian Tanah Keras/Koral = - Urugan Tanah Keras/Koral = - Pemadatan = c 4 Jalur (1,00x0,80x1,20) - Galian Tanah Keras/Koral = - Urugan Tanah Keras/Koral = - Pemadatan = d 5 dan 6 Jalur (1,00x0,60x1,20) - Galian Tanah Keras/Koral = - Urugan Tanah Keras/Koral = - Pemadatan = e 7 dan 8 Jalur (1,00x0,80x1,40) - Galian Tanah Keras/Koral = - Urugan Tanah Keras/Koral = - Pemadatan = f 9 dan 10 Jalur (1,00x100x1,40) 1.12 m3 0.6 m3 0.8 m2 24,233.23 9,464.00 3,713.30 27,141.22 5,678.40 2,970.64 35,790.26 35,790.26 0.84 m3 0.6 m3 0.6 m2 24,233.23 9,464.00 3,713.30 20,355.91 5,678.40 2,227.98 28,262.29 28,262.29 0.96 m3 0.8 m3 0.8 m2 24,233.23 9,464.00 3,713.30 23,263.90 7,571.20 2,970.64 33,805.74 33,805.74 0.72 m3 0.6 m3 0.6 m2 24,233.23 9,464.00 3,713.30 17,447.93 5,678.40 2,227.98 25,354.31 25,354.31 0.65 m3 0.4 m3 0.4 m2 24,233.23 9,464.00 3,713.30 15,751.60 3,785.60 1,485.32 21,022.52 21,022.52 2136 4408.24 7878 11817 3445 9 m3 8.4 m3 3 m2 30,579.00 9,464.00 11,139.90 275,211.00 79,497.60 33,419.70 388,128.30 388,128 97,866

- Galian Tanah Keras/Koral = - Urugan Tanah Keras/Koral = - Pemadatan = g 11 dan 12 Jalur (1,00x1,20x1,40) - Galian Tanah Keras/Koral = - Urugan Tanah Keras/Koral = - Pemadatan = h 13,14 dan 15 Jalur (1,00x1,00x1,60) - Galian Tanah Keras/Koral = - Urugan Tanah Keras/Koral = - Pemadatan = i Penyuntikan Kabel (1,50x0,50x1,10) - Galian Tanah Keras/Koral = - Urugan Tanah Keras/Koral = - Pemadatan =

1.4 m3 1 m3 1 m2

24,233.23 9,464.00 3,713.30

33,926.52 9,464.00 3,713.30 47,103.82 47,103.82

1.68 m3 1.2 m3 1.2 m2

24,233.23 9,464.00 3,713.30

40,711.83 11,356.80 4,455.96 56,524.59 56,524.59

1.6 m3 1 m3 1 m2

24,233.23 9,464.00 3,713.30

38,773.17 9,464.00 3,713.30 51,950.47 51,950.47

0.825 m3 0.75 m3 0.75 m2

24,233.23 9,464.00 3,713.30

19,992.41 7,098.00 2,784.98 29,875.39 29,875.39

j Galian Lub. Sambungan 1s/d2 Jalur ( 2,00x1,30x1,20 ) - Galian Tanah Keras/Koral = - Urugan Tanah Keras/Koral = - Pemadatan = 3.12 m3 2.6 m3 2.6 m2 24,233.23 9,464.00 3,713.30 75,607.68 24,606.40 9,654.58 109,868.66 k Galian Lub. Pengeboran Manual ( 2,00x1,50x3,00 ) - Galian Tanah Keras/Koral = - Urugan Tanah Keras/Koral = - Pemadatan = 9 m3 2.6 m3 2.6 m2 24,233.23 9,464.00 3,713.30 218,099.07 24,606.40 9,654.58 252,360.05 l Galian Lub. Sambungan 1s/d2 Jalur ( 2,00x1,30x1,20 ) - Galian Tanah Keras/Koral = - Urugan Tanah Keras/Koral = - Pemadatan = 3.12 m3 2.6 m3 2.6 m2 24,233.23 9,464.00 3,713.30 75,607.68 24,606.40 9,654.58 109,868.66 m Galian Lub. Pengeboran Manual ( 2,00x1,50x300 ) - Galian Tanah Keras/Koral = - Urugan Tanah Keras/Koral = - Pemadatan = Catatan: - Rp. 24.233,23 HS.Sipil Hal.1 No.06 - Rp. 36.349,84. 300/200xRp.10.504 HS. Sipil Hal.1-No.06 3 CONBLOCK/INTERBLOCK a 1 dan 2 Jalur (1,00x0,40x1,20) - Bongkar Conblock/Interblok = - Galian Tanah Keras = - Urugan Tanah Keras = - Pemadatan = b 3 Jalur (1,00x0,60x1,20) - Bongkar Conblock/Interblok = 0.8 m2 1,600.20 1,280.16 0.6 m2 0.456 m3 0.32 m3 0.4 m2 1,600.20 24,233.23 9,464.00 3,713.30 960.12 11,050.35 3,028.48 1,485.32 16,524.27 16,524.27 9 m3 8.4 m3 3 m2 36,349.84 9,464.00 3,713.30 327,148.56 79,497.60 11,139.90 417,786.06 417,786.06 109,868.66 252,360.05 109,868.66

- Galian Tanah Keras = - Urugan Tanah Keras = - Pemadatan = c 4 Jalur (1,00x0,80x1,20) - Bongkar Conblock/Interblok = - Galian Tanah Keras = - Urugan Tanah Keras = - Pemadatan = d 5 dan 6 Jalur (1,00x0,60x1,40) - Bongkar Conblock/Interblok = - Galian Tanah Keras = - Urugan Tanah Keras = - Pemadatan = e 7 dan 8 Jalur (1,00x0,80x1,40) - Bongkar Conblock/Interblok = - Galian Tanah Keras = - Urugan Tanah Keras = - Pemadatan = f 9 dan 10 Jalur (1,00x1,00x1,40) - Bongkar Conblock/Interblok = - Galian Tanah Keras = - Urugan Tanah Keras = - Pemadatan = g 11 dan 12 Jalur (1,00 x 1,20 x 1,40) - Bongkar Conblock/Interblok = - Galian Tanah Keras = - Urugan Tanah Keras = - Pemadatan =

0.654 m3 0.48 m3 0.6 m2

24,233.23 9,464.00 3,713.30

15,848.53 4,542.72 2,227.98 23,899.39 23,899.39

1 m2 0.912 m3 0.64 m3 0.8 m2

1,600.20 24,233.23 9,464.00 3,713.30

1,600.20 22,100.71 6,056.96 2,970.64 32,728.51 32,728.51

0.8 m2 0.804 m3 0.48 m3 0.6 m2

1,600.20 24,233.23 9,464.00 3,713.30

1,280.16 19,483.52 4,542.72 2,227.98 27,534.38 27,534.38

1 m2 1.072 m3 0.64 m3 0.8 m2

1,600.20 24,233.23 9,464.00 3,713.30

1,600.20 25,978.02 6,056.96 2,970.64 36,605.82 36,605.82

1.2 m2 1.34 m3 0.8 m3 1 m2

1,600.20 24,233.23 9,464.00 3,713.30

1,920.24 32,472.53 7,571.20 3,713.30 45,677.27 45,677.27

1.4 m2 1.608 m3 0.96 m3 1.2 m2

1,600.20 24,233.23 9,464.00 3,713.30

2,240.28 38,967.03 9,085.44 4,455.96 54,748.71 54,748.71

h 13,14 dan 15 Jalur (1,00 x 1,00 x 1,60) - Bongkar Conblock/Interblok = - Galian Tanah Keras = - Urugan Tanah Keras = - Pemadatan = i Penyuntikan Kabel (1,50 x 0,50 x 1,10) - Bongkar Conblock/Interblok = - Galian Tanah Keras = - Urugan Tanah Keras = - Pemadatan = 1.05 m2 0.78 m3 0.63 m3 0.75 m2 1,600.20 24,233.23 9,464.00 3,713.30 1,680.21 18,901.92 5,962.32 2,784.98 29,329.42 j Galian Lub.Sambungan 1 s/d 2 Jalur (2,00 x 1,30 x 1,20) - Bongkar Conblock/Interblok = - Galian Tanah Keras = - Urugan Tanah Keras = - Pemadatan = 3 m2 2.964 m3 2.444 m3 2.6 m2 1,600.20 24,233.23 9,464.00 3,713.30 4,800.60 71,827.29 23,130.02 9,654.58 109,412.49 109,412.49 29,329.42 1.2 m2 1.54 m3 0.8 m3 1 m2 1,600.20 24,233.23 9,464.00 3,713.30 1,920.24 37,319.17 7,571.20 3,713.30 50,523.91 50,523.91

k Galian Lub.Pengeboran Manual (2,00 x 1,50 x 3,00) - Bongkar Conblock/Interblok = - Galian Tanah Keras = - Urugan Tanah Keras = - Pemadatan = Catatan : - Rp. 1.600,2 --HS DKI Hal.38 BKR.59 - Pekerjaan bongkar di tambah 10 cm kiri dan kanan dari lebar galian. 4 UBIN BADAK/KERAMIK/FLOOR BETON BIASA a 1 dan 2 Jalur (1,00 x 0,40 x 1,20 ) - Bongkar Ubin Badak/F.Beton Biasa 0.6 m2 = - Galian Tanah Keras = - Urugan Tanah Keras = - Pemadatan = b 3 Jalur (1,00 x 0,60 x 1,20 ) - Bongkar Ubin Badak/F.Beton Biasa 0.8 m2 = - Galian Tanah Keras = - Urugan Tanah Keras = - Pemadatan = c 4 Jalur (1,00 x 0,80 x 1,20 ) - Bongkar Ubin Badak/F.Beton Biasa = - Galian Tanah Keras = - Urugan Tanah Keras = - Pemadatan = d 5 dan 6 Jalur (1,00 x 0,60 x 1,40 ) - Bongkar Ubin Badak/F.Beton Biasa 0.8 m2 = - Galian Tanah Keras = - Urugan Tanah Keras = - Pemadatan = e 7 dan 8 Jalur (1,00 x 0,80 x 1,40 ) - Bongkar Ubin Badak/F.Beton Biasa = - Galian Tanah Keras = - Urugan Tanah Keras = - Pemadatan = f 9 dan 10 Jalur (1,00 x 1,00 x 1,40 ) - Bongkar Ubin Badak/F.Beton Biasa 1.2 m2 = - Galian Tanah Keras = - Urugan Tanah Keras = - Pemadatan = g 11 dan 12 Jalur (1,00 x 1,20 x 1,40 ) - Bongkar Ubin Badak/F.Beton Biasa 1.4 m2 = - Galian Tanah Keras = - Urugan Tanah Keras = 1.584 m3 0.984 m3 1,600.20 24,233.23 9,464.00 2,240.28 38,385.44 9,312.58 1.32 m3 0.82 m3 1 m2 1,600.20 24,233.23 9,464.00 3,713.30 1,920.24 31,987.86 7,760.48 3,713.30 45,381.88 45,381.88 1 m2 1,600.20 24,233.23 9,464.00 3,713.30 1,600.20 25,590.29 6,208.38 2,970.64 36,369.51 36,369.51 1.056 m3 0.656 m3 0.8 m2 0.792 m3 0.492 m3 0.6 m2 1,600.20 24,233.23 9,464.00 3,713.30 1,280.16 19,192.72 4,656.29 2,227.98 27,357.15 27,357.15 1 m2 1,600.20 24,233.23 9,464.00 3,713.30 1,600.20 21,712.97 6,208.38 2,970.64 32,492.20 32,492.20 0.896 m3 0.656 m3 0.8 m2 0.672 m3 0.492 m3 0.6 m2 1,600.20 24,233.23 9,464.00 3,713.30 1,280.16 16,284.73 4,656.29 2,227.98 24,449.16 24,449.16 0.446 m3 0.328 m3 0.4 m2 1,600.20 24,233.23 9,464.00 3,713.30 960.12 10,808.02 3,104.19 1,485.32 16,357.65 16,357.65 3.4 m2 8.82 m3 8.22 m3 3 m2 1,600.20 36,349.84 9,464.00 3,713.30 5,440.68 320,605.59 77,794.08 11,139.90 414,980.25 414,980.25

- Pemadatan =

1.2 m2

3,713.30

4,455.96 54,394.25 54,394.25

h 13, 14 dan 15 Jalur (1,00 x 1,00 x 1,60) - Bongkar Ubin Badak/F.Beton Biasa 1.2 m2 = - Galian Tanah Keras = - Urugan Tanah Keras = - Pemadatan = i Penyuntikan Kabel (1,50 x 0,50 x 1,10) - Bongkar Ubin Badak/F.Beton Biasa 1.05 m2 = - Galian Tanah Keras = - Urugan Tanah Keras = - Pemadatan = 0.765 m3 0.6525 m3 0.75 m2 1,600.20 24,233.23 9,464.00 3,713.30 1,680.21 18,538.42 6,175.26 2,784.98 29,178.87 i Galian Lub. Sambungan 1 s/d 2 Jalur (2,00 x 1,30 x 1,20) - Bongkar Ubin Badak/F.Beton Biasa = - Galian Tanah Keras = - Urugan Tanah Keras = - Pemadatan = 3 m2 1,600.20 24,233.23 9,464.00 3,713.30 4,800.60 70,567.17 23,868.21 9,654.58 108,890.55 k Galian Lub. Pengeboran (2,00 x 1,50 x 3,00) - Bongkar Ubin Badak/F.Beton Biasa 3.4 m2 = - Galian Tanah Keras = - Urugan Tanah Keras = - Pemadatan = 5 FLOOR BETON COR a 1 dan 2 Jalur (1,00 x 0,40 x 1,20) - Bongkar Floor Beton cor = - Galian Tanah Keras = - Urugan Tanah Keras = - Pemadatan = b 3 Jalur (1,00 x 0,60 x 1,20) - Bongkar Floor Beton cor = - Galian Tanah Keras = - Urugan Tanah Keras = - Pemadatan = c 4 Jalur (1,00 x 0,80 x 1,20) - Bongkar Floor Beton cor = - Galian Tanah Keras = - Urugan Tanah Keras = - Pemadatan = d 5 dan 6 Jalur (1,00 x 0,60 x 1,40) - Bongkar Floor Beton cor = - Galian Tanah Keras = - Urugan Tanah Keras = - Pemadatan = e 7 dan 8 Jalur (1,00 x 0,80 x 1,40) 0.056 m3 0.798 m3 0.468 m3 0.6 m2 212,815.30 24,233.23 9,464.00 3,713.30 11,917.66 19,338.12 4,429.15 2,227.98 37,912.91 37,912.91 0.07 m3 0.904 m3 0.624 m3 0.8 m2 212,815.30 24,233.23 9,464.00 3,713.30 14,897.07 21,906.84 5,905.54 2,970.64 45,680.09 45,680.09 0.056 m3 0.678 m3 0.468 m3 0.6 m2 212,815.30 24,233.23 9,464.00 3,713.30 11,917.66 16,430.13 4,429.15 2,227.98 35,004.92 35,004.92 0.042 m3 0.452 m3 0.312 m3 0.42 m2 212,815.30 24,233.23 9,464.00 3,713.30 8,938.24 10,953.42 2,952.77 1,559.59 24,404.02 24,404.02 8.75 m3 8.31 m3 3 m2 1,600.20 36,349.84 9,464.00 3,713.30 5,440.68 318,061.10 78,645.84 11,139.90 413,287.52 413,287.52 108,890.55 2.912 m3 2.522 m3 2.6 m2 29,178.87 1.52 m3 0.82 m3 1 m2 1,600.20 24,233.23 9,464.00 3,713.30 1,920.24 36,834.51 7,760.48 3,713.30 50,228.53 50,228.53

- Bongkar Floor Beton cor = - Galian Tanah Keras = - Urugan Tanah Keras = - Pemadatan = f 9 dan 10 Jalur (1,00 x 1,00 x 1,40) - Bongkar Floor Beton cor = - Galian Tanah Keras = - Urugan Tanah Keras = - Pemadatan = g 11 dan 12 Jalur (1,00 x 1,20 x 1,40) - Bongkar Floor Beton cor = - Galian Tanah Keras = - Urugan Tanah Keras = - Pemadatan =

0.07 m3 1.064 m3 0.624 m3 0.8 m2

212,815.30 24,233.23 9,464.00 3,713.30

14,897.07 25,784.16 5,905.54 2,970.64 49,557.40 49,557.40

0.084 m3 1.33 m3 0.728 m3 1 m2

212,815.30 24,233.23 9,464.00 3,713.30

17,876.49 32,230.20 6,889.79 3,713.30 60,709.77 60,709.77

0.098 m3 1.596 m3 0.936 m3 1.2 m2

212,815.30 24,233.23 9,464.00 3,713.30

20,855.90 38,676.24 8,858.30 4,455.96 72,846.40 72,846.40

h 13,14 dan 15 Jalur (1,00 x 1,00 x 1,60) - Bongkar Floor Beton cor = - Galian Tanah Keras = - Urugan Tanah Keras = - Pemadatan = i Penyuntikan Kabel (1,50 x 0,50 x 1,10) - Bongkar Floor Beton cor = - Galian Tanah Keras = - Urugan Tanah Keras = - Pemadatan = 0.0735 m3 0.7725 m3 0.6225 m3 0.75 m2 212,815.30 24,233.23 9,464.00 3,713.30 15,641.92 18,720.17 5,891.34 2,784.98 43,038.41 j Galian Lub. Sambungan 1 s/d 2 Jalur (2,00 x 1,30 x 1,20) - Bongkar Floor Beton cor = - Galian Tanah Keras = - Urugan Tanah Keras = - Pemadatan = 0.21 m3 2.938 m3 2.418 m3 0.6 m2 212,815.30 24,233.23 9,464.00 3,713.30 44,691.21 71,197.23 22,883.95 2,227.98 141,000.37 k Galian Lub. Pengeboran Manual (2,00 x 1,50 x 3,00) - Bongkar Floor Beton cor = - Galian Tanah Keras = - Urugan Tanah Keras = - Pemadatan = Catatan : - Rp. 212.815,30-- HS.DKI hAL.33 - bkr.03 6 FLOOR BETON BERTULANG a 1 dan 2 (1,00 x 0,40 x 1,20) - Bongkar Floor Beton Bertulang = - Galian Tanah Keras = - Urugan Tanah Keras = - Pemadatan = b 3 Jalur (1,00 x 0,60 x 1,20) 0.06 m3 0.44 m3 0.32 m3 0.3 m2 295,701.25 24,233.23 9,464.00 3,713.30 17,742.08 10,662.62 3,028.48 1,113.99 32,547.17 32,547.17 79970 0.238 m3 8.79 m3 8.19 m3 3 m2 212,815.30 24,233.23 9,464.00 3,713.30 50,650.04 213,010.09 77,510.16 11,139.90 352,310.19 352,310.19 141,000.37 43,038.41 0.084 m3 1.53 m3 0.78 m3 1 m2 212,815.30 24,233.23 9,464.00 3,713.30 17,876.49 37,076.84 7,381.92 3,713.30 66,048.55 66,048.55

- Bongkar Floor Beton Bertulang = - Galian Tanah Keras = - Urugan Tanah Keras = - Pemadatan = c 4 Jalur (1,00 x 0,80 x 1,20) - Bongkar Floor Beton Bertulang = - Galian Tanah Keras = - Urugan Tanah Keras = - Pemadatan = d 5 dan 6 Jalur (1,00 x 0,60 x 1,40) - Bongkar Floor Beton Bertulang = - Galian Tanah Keras = - Urugan Tanah Keras = - Pemadatan = e 7 dan 8 Jalur (1,00 x 0,80 x 1,40) - Bongkar Floor Beton Bertulang = - Galian Tanah Keras = - Urugan Tanah Keras = - Pemadatan = f 9 dan 10 Jalur (1,00 x 1,00 x 1,40) - Bongkar Floor Beton Bertulang = - Galian Tanah Keras = - Urugan Tanah Keras = - Pemadatan = g 11 dan 12 Jalur (1,00 x 1,20 x 1,40) - Bongkar Floor Beton Bertulang = - Galian Tanah Keras = - Urugan Tanah Keras = - Pemadatan =

0.08 m3 0.66 m3 0.48 m3 0.6 m2

295,701.25 24,233.23 9,464.00 3,713.30

23,656.10 15,993.93 4,542.72 2,227.98 46,420.73 46,420.73

0.1 m3 0.88 m3 0.64 m3 0.8 m2

295,701.25 24,233.23 9,464.00 3,713.30

29,570.13 21,325.24 6,056.96 2,970.64 59,922.97 59,922.97

0.08 m3 0.78 m3 0.48 m3 0.6 m2

295,701.25 24,233.23 9,464.00 3,713.30

23,656.10 18,901.92 4,542.72 2,227.98 49,328.72 49,328.72

0.1 m3 1.04 m3 0.64 m3 0.8 m2

295,701.25 24,233.23 9,464.00 3,713.30

29,570.13 25,202.56 6,056.96 2,970.64 63,800.28 63,800.28

0.12 m3 1.3 m3 0.8 m3 1 m2

295,701.25 24,233.23 9,464.00 3,713.30

35,484.15 31,503.20 7,571.20 3,713.30 78,271.85 78,271.85

0.14 m3 1.56 m3 0.96 m3 1.2 m2

295,701.25 24,233.23 9,464.00 3,713.30

41,398.18 37,803.84 9,085.44 4,455.96 92,743.41 92,743.41

h 13,14 dan 15 Jalur (1,00 x 1,00 x 1,60) - Bongkar Floor Beton Bertulang = - Galian Tanah Keras = - Urugan Tanah Keras = - Pemadatan = i Penuntikan Kabel (1,50 x 0,50 x 1,10) - Bongkar Floor Beton Bertulang = - Galian Tanah Keras = - Urugan Tanah Keras = - Pemadatan = 0.105 m3 0.75 m3 0.6 m3 1.75 m2 295,701.25 24,233.23 9,464.00 3,713.30 31,048.63 18,174.92 5,678.40 6,498.28 61,400.23 j Galian Lub. Sumbangan 1 s/d 2 Jalur (2,00 x 1,30 x 1,20) - Bongkar Floor Beton Bertulang = - Galian Tanah Keras = - Urugan Tanah Keras = - Pemadatan = 0.3 m3 2.86 m3 2.34 m3 2.6 m2 295,701.25 24,233.23 9,464.00 3,713.30 88,710.38 69,307.04 22,145.76 9,654.58 61,400.23 0.12 m3 1.5 m3 0.8 m3 1 m2 295,701.25 24,233.23 9,464.00 3,713.30 35,484.15 36,349.85 7,571.20 3,713.30 83,118.50 83,118.50

189,817.75 k Galian Lub. Pengeboran Manual (2,00 x 1,50 x 3,00) - Bongkar Floor Beton Bertulang = - Galian Tanah Keras = - Urugan Tanah Keras = - Pemadatan = Catatan : - Rp. 295.701.25,- - HS.SIPIL Hal.36 - BKR.04 7 ASPAL BIASA/HOTMIX a 1 dan 2 Jalur (1,00 x 1,40 x 1,20) - Bongkar Aspal/Hotmix = - Galian Tanah Berbatu = - Galian Tanah Keras = - Urugan Tanah Keras = - Pemadatan = b 3 Jalur (1,00 x 0,60 x 1,20) - Bongkar Aspal/Hotmix = - Galian Tanah Berbatu = - Galian Tanah Keras = - Urugan Tanah Keras = - Pemadatan = c 4 Jalur (1,00 x 0,80 x 1,20) - Bongkar Aspal/Hotmix = - Galian Tanah Berbatu = - Galian Tanah Keras = - Urugan Tanah Keras = - Pemadatan = d 5 dan 6 Jalur (1,00 x 0,60 x 1,40) - Bongkar Aspal/Hotmix = - Galian Tanah Berbatu = - Galian Tanah Keras = - Urugan Tanah Keras = - Pemadatan = e 7 dan 8 Jalur (1,00 x 0,80 x 1,40) - Bongkar Aspal/Hotmix = - Galian Tanah Berbatu = - Galian Tanah Keras = - Urugan Tanah Keras = - Pemadatan = f 9 dan 10 Jalur (1,00 x 1,00 x 1,40) - Bongkar Aspal/Hotmix = - Galian Tanah Berbatu = - Galian Tanah Keras = - Urugan Tanah Keras = - Pemadatan = 1 m2 0.65 m3 0.7 m3 0.3 m3 1 m2 11,766.92 40,751.00 24,233.23 9,464.00 1,856.65 11,766.92 26,488.15 16,963.26 2,839.20 1,856.65 0.8 m2 0.52 m3 0.56 m3 0.24 m3 0.8 m2 11,766.92 40,751.00 24,233.23 9,464.00 1,856.65 9,413.54 21,190.52 13,570.61 2,271.36 1,485.32 47,931.34 0.6 m2 0.39 m3 0.42 m3 0.18 m3 0.6 m2 11,766.92 40,751.00 24,233.23 9,464.00 1,856.65 7,060.15 15,892.89 10,177.96 1,703.52 1,113.99 35,948.51 0.8 m2 0.52 m3 0.4 m3 0.24 m3 0.8 m2 11,766.92 40,751.00 24,233.23 9,464.00 1,856.65 9,413.54 21,190.52 9,693.29 2,271.36 1,485.32 44,054.03 0.6 m2 0.39 m3 0.3 m3 0.18 m3 0.6 m2 11,766.92 40,751.00 24,233.23 9,464.00 1,856.65 7,060.15 15,892.89 7,269.97 1,703.52 1,113.99 33,040.52 0.4 m2 0.26 m3 0.2 m3 0.12 m3 0.4 m2 11,766.92 40,751.00 24,233.23 9,464.00 1,856.65 4,706.77 10,595.26 4,846.65 1,135.68 742.66 22,027.01 0.34 m3 8.7 m3 8.1 m3 3 m2 295,701.25 24,233.23 9,464.00 3,713.30 100,538.43 210,829.10 76,658.40 11,139.90 399,165.83

189,817.75

399,165.83

22,027.01

33,040.52

44,054.03

35,948.51

47,931.34

59,914.18 g 11 dan 12 Jalur (1,00 x 1,20 x 1,40) - Bongkar Aspal/Hotmix = - Galian Tanah Berbatu = - Galian Tanah Keras = - Urugan Tanah Keras = - Pemadatan = 1.2 m2 0.78 m3 0.84 m3 0.36 m3 1.2 m2 11,766.92 40,751.00 24,233.23 9,464.00 1,856.65 14,120.30 31,785.78 20,355.91 3,407.04 2,227.98 71,897.02 h 13, 14 dan 15 Jalur (1,00 x 1,00 x 1,60) - Bongkar Aspal/Hotmix = - Galian Tanah Berbatu = - Galian Tanah Keras = - Urugan Tanah Keras = - Pemadatan = i Penyuntikan Kabel ( 1,50 x 0,50 x 1,10 ) - Bongkar Aspal/Hotmix = - Galian Tanah Berbatu = - Galian Tanah Keras = - Urugan Tanah Keras = - Pemadatan = 0.75 m2 0.4875 m3 0.3 m3 0.225 m3 0.75 m2 11,766.92 40,751.00 24,233.23 9,464.00 1,856.65 8,825.19 19,866.11 7,269.97 2,129.40 1,392.49 39,483.16 j Galian Lub. Sambungan 1 s/d Jalur ( 2,00 x 1,30 x 1,20 ) - Bongkar Aspal/Hotmix = - Galian Tanah Berbatu = - Galian Tanah Keras = - Urugan Tanah Keras = - Pemadatan = 2.6 m2 1.69 m3 1.3 m3 0.78 m3 2.6 m2 11,766.92 40,751.00 24,233.23 9,464.00 1,856.65 30,593.99 68,869.19 31,503.20 7,381.92 4,827.29 143,175.59 k Galian Lub. Pengeboran Manual ( 2,00 x 1,50 x 3,00 ) - Bongkar Aspal/Hotmix = - Galian Tanah Berbatu = - Galian Tanah Keras = - Urugan Tanah Keras = - Pemadatan = 8 POMPONGAN - Pekerja Catatan : - Rp.11.766.92,- - HS.DKI Hal.36 - BRK.07 - Rp.40.751,- - HS Sipil Hal.2 No.07 - Rp. 1.856.65 - HS.DKI Hal.3 TN.24 II 1 a PENARIKAN DAN PENYAMBUNGAN Penarikan/Penggelaran Kabel 3 x 150 mm2 1 Hari / 8 Jam = 600 Meter - Tenaga Ahli Muda - Teknisi - Pekerja 1 Tenaga.Ah.Muda 1 Teknisi 75 Pekerja = 123,500.00 56,250.00 32,250.00 2.598.500 / 600 123,500.00 56,250.00 2,418,750.00 2,598,500.00 Biaya Penggelaran Kabel / Meter 4,330.83 0.3 pekerja 32,250.00 10,750.00 3 m2 1.95 m3 6.9 m3 6.3 m3 3 m2 11,766.92 40,751.00 24,233.23 9,464.00 1,856.65 35,300.76 79,464.45 167,209.29 59,623.20 5,569.95 347,167.65 1 m2 0.65 m3 0.9 m3 0.3 m3 1 m2 11,766.92 40,751.00 24,233.23 9,464.00 1,856.65 11,766.92 26,488.15 21,809.91 2,839.20 1,856.65 64,760.83

59,914.18

71,897.02

64,760.83

39,483.16

143,175.59

347,167.65 10,750.00 3575 15769 1068

4,330.00

b Penarikan/Penggelaran Kabel 3 x 240 mm2

1 Hari / 8 Jam = 500 Meter - Tenaga Ahli Muda - Teknisi - Pekerja 1 Tenaga.Ah.Muda 1 Teknisi 75 Pekerja = 123,500.00 56,250.00 32,250.00 2.598,500 / 500 123,500.00 56,250.00 2,418,750.00 2,598,500.00 Biaya Penggelaran Kabel / Meter 1 Hari / 8 Jam = 500 Meter - Tenaga Ahli Muda - Teknisi - Pekerja 1 Tenaga.Ah.Muda 1 Teknisi 75 Pekerja = 2.598.500 / 500 123,500.00 56,250.00 32,250.00 123,500.00 56,250.00 2,418,750.00 2,598,500.00 Biaya Penggelaran Kabel / Meter 2 5,197.00 5,190.00 5,197.00 5,190.00 c Penarikan/Penggelaran Kabel 3 x 300 mm2

Penyambungan SKTM 20 KV 3 x 150 / 240 / 300 mm2 a Dengan Pola S / E 1 Hari / 6 Jam = 1 Set - Tenaga Ahli Muda (Jointer) 0.5 Tenaga.Ah.Muda - Tukang - Supervisi 3 Orang 0.5 Tukang Pabrikan Main Kontraktor 50% 123,500.00 40,500.00 61,750.00 20,250.00 82,000.00 174,750.00 169,375.00 426,125.00 426,125.00

3

Terminasi Kabel Indoor 20 KV 3 x 150,3 x 240,3 x 300 mm2 a Dengan Pola S / E 1 Hari / 4 Jam = 1 Set - Tenaga Ahli Muda (Jointer) 0.5 Tenaga.Ah.Muda - Tukang - Supervisi 3 Orang 0.5 Tukang Pabrikan Main Kontraktor 50% b Terminasi Kabel Outdoor 20 KV 3 x 150,3 x 240,3 x 300 mm2 Dengan Pola S / E 1 Hari / 4 Jam = 1 Set - Tenaga Ahli Muda (Jointer) 0.5 Tenaga.Ah.Muda - Tukang - Supervisi 3 Orang 0.5 Tukang Pabrikan Main Kontraktor 50% 123,500.00 40,500.00 61,750.00 20,250.00 82,000.00 174,750.00 169,375.00 426,125.00 426,125.00 123,500.00 40,500.00 61,750.00 20,250.00 82,000.00 174,750.00 169,375.00 426,125.00 426,125.00

III

MATERIAL PELENGKAP a Pengadaan dan Pemas.Patok Tanda Kabel 20 KV PLN - Beton Bertulang 1:2:3 - Angkatan ( Rit ) = 1/ 0.012 m3 40 Buah 687,193.00 65,000.00 8,246.00 1,625.00 9,871.00 b Pengadaan dan Pemasangan Tanda Mof Kabel 20 KV PLN - Beton Bertulang 1:2:3 - Angkatan ( Rit ) = 1/ 0.012 m3 40 Buah 687,193.00 65,000.00 8,246.00 1,625.00 9,871.00 9,870.00 9,870.00

c Pengadaan & Pemasangan Batu Bata Merah ( 5x10x20 ) d Pengad. & Pemas.Timah Lebel Uk.(5cm x 25cm x 1,2mm) - Harga Timah - Bahan timah - Pekerja = = Rp.5.200.000/Ton = Rp.5.200.000/6.000 buah 2/ 1/ 60 Buah 4,000 Buah 32,250.00 65,000.00 1,075.00 16,250.00 18,192.00 Catatan : - Beton 1:2:3 / m3 (100 kg) Rp.687.193,- HS.SIPIL No.34 - Angkutan Rp. 65.000,-/Rit HS.DKI Hal.122 - 15007 - Rp.137,- (Harga Batu Bata Rp.130 + ongkos Pasang Rp.7,-) e Pengad. & Pemasangan Keramik Tanda Peringan Kabel PLN - Bahan (0,225 x 0,30) + Produksi - Biaya Penyusutan - Angkutan dari pabrik ke lokasi pekerjaan - Ongkos Pasang (*) Catatan : Sumber Analisa dan Pabrikan f Pengadaan/pemasangan pasir urug darat sepanjang galian dan lubang sambungan kabel 20 KV PLN. g Pengad.&Pemas.pipa Buis Beton Konstruksi Khusus O 20cm/mtr h Pengad.& Pemas.Pipa Pralon O 6 Insi type AW / meter i Pengad.& Pemasangan Besi Kanal UNP 120.55.7 Double - UNP .120.55.7 = - UNP .140.60.7 = Catatan : - Rp. 4.200,- Hs Sipil No.44 - Rp. 49.960,- Hs.Sipil No.7 - Rp. 11.100,- HS.Sipil No.50 - Rp. 33.220,- Hs.Sipil No.45 IV PENGEBORAN CROSSING JALAN a Crossing / Boring Manual Boring Manual = 1 Hari = 8 meter - Mandor - Pekerja 1 5 Mandor Tk.Kayu Pekerja m3 batang kg = 56,250.00 40,500.00 32,250.00 572,000.00 3,250.00 2,600.00 56,250.00 40,500.00 161,250.00 720,720.00 39,000.00 2,600.00 1,020,320.00 Harga Pengeboran Meter 127,570.00 c Ijin Boring Jalan Tol Jasa Marga (4 Jalur) 127,540.00 - Tukang Kayu 1 - Papan Penahan Tanah 1.26 - Dolken 5/7 12 - Paku 1 26.80 Kg/Mtr Double 32.00 Kg/Mtr Double 112,533.00 134,368.00 j Pengad.& Pemasangan Besi Kanal UNP 140.60.7 Double 49,959.00 11,102.00 33,215.00 449.00 104.00 260.00 98.00 449.00 104.00 260.00 96.00 909.00 867.00 - 1 Ton timah Dpt = 6.000 buah Timah lebel

136.00

- Angkutan ( Rit ) =

18,192.00

910.00

127,540.00 91,130.00

b Boring Mesin(Lihat HS.Boring Mesin/sesuai Kontrak)

d Ijin Boring Rel Kereta Api/PJKA (Dalam Bestek sewa lahan tidak dicantumkan dan akan di bayar sesuai realisasi berdasarkan bukti yang dapat diPertanggungJawabkan - Biaya Penguatan 1 Spoor - Biaya Penguatan 2 Spoor - Biaya Penguatan 3 Spoor - Biaya Penguatan 4 Spoor V PERBAIKAN BEKAS GALIAN KABEL ( BERIKUT MATERIAL ) a Tanah Biasa/Tanah Rumput ( Pekerjaan Perbaikan/pemadatan sudah termasuk dalan pekerjaan galian ) b Tanah Keras/Koral ( Pekerjaan perbaikan / pemadatan sudah pekrjaan galian c Conblock/Interblock - Pengadaan Conblock/Interblock Abu-abu segi 16 tebal 6 cm = - Ongkos Kerja = - Lapisan Pasir Tebal 5 cm = - Lapisan Sirtu=Tebal 9 cm (*) Rp. 640 = Rp. 31.980/50 buah d Ubin Badak - Ubin badak 30x30 cm adukan 1:3 = Alas Pasir Tebal 5 cm e Floor Beton Biasa - Lap.F.Beton = Biasa 1:3 Tebal 5 cm 1.00 m2/(5/100) - Lapisan Pasir Tebal 5 cm 1.00 m2/(5/20) = 216,242.00 12,961.00 10,812.10 3,240.25 14,052.35 Catatan : (*) - Lapisan Pasir tebal 20 cm/m2 Rp.12.960 - HS.SKI Hal.36-LBJ.03 - Lapisan Sirtu tebal 30 cm/m2 Rp.16.190-HS.DKI Hal.25-LBJ.13 - Rp. 216.240,- Hs. Sipil No.136 - Rp. 233.750,- Hs. Sipil No. 27 - Rp. 687.190 - Hs. Sipil No. 34 - Rp. 26.710 Hs. DKI Lt.03 +LBJ.04(16.960 + 9.750) - Rp. 572.000,- Hs.DKI Hal.108 - 3007 - Rp. 3.250,- Hs.DKI Hal.108 - 3034 - Rp. 2.600,- Hs.DKI Hal.118 - 12001 - Rp. 31.980,- Hs.DKI Hal. 31 - TBJ.04 - Rp. 5.000,- Hs.DKI Hal.31 - TBJ.04 f Floor Beton Cor - Lap.Floor Beton cor 1:3:5 Tebal m2/(7/100) = 1.00 7 c - Lapisan Pasir Tebal 15 cm 1.00 m2/(15/20) = g Beton Bertulang - Lap.Floor Cor 1:3 tebal 10 cm m2/(10/100) = 1.00 - Lapisan Pasir Tebal 10 cm 1.00 m2/(10/20) = h Shand sheet = 1.00 m2 687,193.00 12,961.00 10,920.00 68,719.30 6,480.50 75,199.80 10,926.00 i Aspal Biasa/Penetrasi : 5/20/30 75,199.80 10,930.00 0.1 0.5 233,753.00 12,961.00 11,687.65 9,720.75 21,408.40 21,408.40 0.05 0.75 14,052.35 0.05 0.25 1 m2 26,707.00 26,707.00 26,707.00 26,710.00 15 buah 1 m2 1 m2 1 m2 640.00 5,005.00 12,961.00 16,189.00 9,594.00 5,005.00 3,240.00 4,857.00 22,696.00 22,700.00 2,073,500.00 3,822,000.00 5,505,500.00 7,252,700.00

- Lapisan Penetrasi Tebal 5 cm m2 = 1.00 - Lapisan Macadam Tebal 20 cm m2 = 1.00 - Lapisan Sirtu=Tebal 30 cm 1.00 m2 j Aspal Hotmix : 5/5/20/30 ( Jalan kelas III ) - Lapisan Hotmix tebal 5 cm 1.00 m2 = - Lapisan tebal Coating BC.II = 1.00 m2 - Lapisan Penetrasi Tebal 5 cm m2 = 1.00 - Lapisan Macadam Tebal 20 cm m2 = 1.00 - Lapisan Sirtu=Tebal 30 cm 1.00 m2

13,313.00 17,186.00 16,190.00

13,313.00 17,186.00 16,190.00 46,689.00 46,700.00

20,744.00 3,188.00 13,314.00 17,186.00 16,190.00

20,744.00 3,188.00 13,314.00 17,186.00 16,190.00 70,622.00 70,630.00

k Aspal Hotmix : 5/5/20/40 ( Jalan kelas II ) - Lapisan Hotmix tebal 5 cm 1.00 m2 = - Lapisan tebal Coating BC.II = 1.00 m2 - Lapisan Penetrasi Tebal 5 cm m2 = 1.00 - Lapisan Macadam Tebal 20 cm m2 = 1.00 - Lapisan Sirtu=Tebal 40 cm 1.00 m2 20,744.00 3,188.00 13,314.00 17,186.00 22,024.00 20,744.00 3,188.00 13,314.00 17,186.00 22,024.00 76,456.00 l Aspal Hotmix : 5/5/20/70 ( Crossing Open Cut Jalan kelas II ) - Lapisan Hotmix tebal 5 cm 1.00 m2 = - Lapisan tebal Coating BC.II = 1.00 m2 - Lapisan Penetrasi Tebal 5 cm m2 = 1.00 - Lapisan Macadam Tebal 20 cm m2 = 1.00 - Lapisan Sirtu=Tebal 70 cm 1.00 m2 (70/40) m Aspal Hotmix : 7/5/20/40 ( Jalan kelas I ) - Lapisan Hotmix tebal 7 cm 1.00 m2 = - Lapisan tebal Coating BC.II = 1.00 m2 - Lapisan Penetrasi Tebal 5 cm m2 = 1.00 - Lapisan Macadam Tebal 20 cm m2 = 1.00 - Lapisan Sirtu=Tebal 40 cm 1.00 m2 28,972.00 3,188.00 13,314.00 17,186.00 22,024.00 28,972.00 3,188.00 13,314.00 17,186.00 22,024.00 84,684.00 n Aspal Hotmix : 7/5/20/70 ( Crossing Open Cut Jalan kelas I ) - Lapisan Hotmix tebal 7 cm 1.00 m2 = - Lapisan tebal Coating BC.II = 1.00 m2 - Lapisan Penetrasi Tebal 5 cm m2 = 1.00 - Lapisan Macadam Tebal 20 cm m2 = 1.00 - Lapisan Sirtu=Tebal 70 cm 1.00 m2 (70/40) o Aspal Hotmix : 7/5/20/30 ( Jalan kelas IV ) - Lapisan Hotmix tebal 3 cm 1.00 m2 = - Lapisan tebal Coating BC.II = 1.00 m2 - Lapisan Penetrasi Tebal 5 cm m2 = 1.00 - Lapisan Macadam Tebal 20 cm m2 = 1.00 - Lapisan Sirtu=Tebal 70 cm 1.00 m2 12,517.00 3,188.00 13,314.00 17,186.00 16,190.00 12,517.00 3,188.00 13,314.00 17,186.00 16,190.00 62,395.00 p Ubin Keramik - Pasang Keramik 10 x 20 = - Pasang Keramik 20 x 20 = 1.00 m2 1.00 m2 37,999.00 40,742.00 37,999.00 40,742.00 38,000.00 40,740.00 62,390.00 28,972.00 3,188.00 13,314.00 17,186.00 22,024.00 28,972.00 3,188.00 13,314.00 17,186.00 38,541.00 101,201.00 101,201.00 84,680.00 20,744.00 3,188.00 13,314.00 17,186.00 22,024.00 20,744.00 3,188.00 13,314.00 17,186.00 38,541.00 92,973.00 92,980.00 76,460.00

- Pasang Keramik 30 x 30 = q Rumput / Taman

1.00 m2

43,472.00

43,472.00

43,470.00

- Perbaikan rumput/taman disesuaikan dengan HS.DKI/Pertamanan ( Dalam bestek biaya perbaikan rumput/taman tidak dicantumkan dan akan dibayar sesuai realisasi berdasarkan bukti yang dapat pertanggung jawabkan ) Catatan (*) - Rp. 13.320 Hs.DKI hal.30 LAJ.04 - Rp. 12.520,21 Hs.DKI Hal.49 - Rp. 17.200 Hs.DKI hal.36 LBJ.07 - Rp. 20.745 Hs.DKI Hal.49 - Rp. 10.920, - Hs.DKI hal.36 LBJ.17 - Rp. 28.970 Hs.DKI Hal.49 - Rp. 3.200 - Hs.DKI hal.30 LBJ.07 VI PERBAIKAN BEKAS GALIAN PADA LUB.SAMBUNGAN - HS. sama dengan HS. Perbaikan Bekas Galian Kabel VII PERBAIKAN BEKAS GALIAN PADA LUB.PENGEBORAN - HS. sama dengan HS. Perbaikan Bekas Galian Kabel VIII PERBAIKAN BEKAS GALIAN PADA LUB.PENYUNTIKAN - HS. sama dengan HS. Perbaikan Bekas Galian Kabel IX PEKERJAAN LAIN-LAIN a Pembuangan tanah bekas galian dengan truck kapasitas 3 s/d 4m3 jarak>20 Km (Volume yang di buang =Lebar galianx (tinggi lapisan pasir urug + lapisan penutup galian)xpanjang (trace galian) b Penjagaan - 1 Pekerja/Hari c Penyediaan tenaga untuk bantu pengujian kabel TM PLN - Pekerja - Instalatir 2 Pekerja 2 Instalatir 32,250.00 13,000.00 64,500.00 26,000.00 90,500.00 d Pemasangan arrester 20 KV termasuk pentanahan ( Sama dengan HS.SUTM ) - Pmasangan arresterdan pengadaan dudukan arreter - Pengadaan/Pemasangan pipa arde 0 1,5 inci - 6 mtr X BIAYA PENGURUSAN IJIN 1 Pemda DKI a SPS BKJS ( Pengawasan,Perencanaan) 60% RAB perbaikan b Q. Control pada hotmix/km 1,000/ c Q. Control pada hotmix/km 1,000/ d Proctor ( b + c )/ Km e SPS.DTK ( Trace dan Gambar ) f Pengurusan 2 Diluar Pemda DKI dan Instalasi lain a Biaya Restribusi b Pengurusan 3 Perum Otorita Jatiluhur/ Pengairan 130.00 65.00 130.00 65.00 130.00 65.00 100 x 1 Titik 100 x 1 Titik 58,570.00 10,790.00 75,660.00 501,260.00 585,700.00 107,900.00 151,320.00 501,260.00 585,700.00 107,900.00 151,320.00 501,260.00 118,872.00 76,713.00 118,872.00 76,713.00 195,585.00 195,585.00 90,500.00 32,250.00 32,250.00 32,250.00 21,125.00 21,130.00 - Rp. 38.000 - HS.Sipil No.84 - Rp. 40740 - HS.Sipil No.80 - Rp. 43.470 - HS.Sipil No.81 di

- Rp. 16.200 Hs.DKI hal.36 LBJ.13 - Rp. 22.025 Hs.DKI Hal.36 LBJ.14

a Biaya sewa lahan (Dalam bestek sewa lahan tidak dicantumkan dan akan dibayar sesuai realisasi berdasarkan bukti - bukti yang dapat dipertanggungjawabkan) b Pengurusan ke Jatiluhur Purwakarta Catatan : Rp- Rp 21.25,- HS.DKI hal.5-AG.11 XI PENGANGKUTAN KABEL 1 Angkutan kabel TM./Meter a Angkutan SKTM 10 - 50 meter b Angkutan SKTM 50 - 100 meter c Angkutan SKTM 100 - 200 meter 2 Angkutan kabel TM./ haspel a Angkutan SKTM 1 Haspel b Angkutan SKTM 2 Haspel c Angkutan SKTM 3 Haspel XII DIREKSI KEET a Pengdaan dan Pemasangan Diteksi Kett 2 x 4 meter = 8 m2 untuk pekerjaan dengan masa kerja : - 1 s/d 30 HKL = 1/3 x 8 m2 - 31 s/d 180 HKL = 1/2 x 8 m2 - 181 s/d 360 HKL = 1/1 x m2 b Pengadaan dan Pemasangan Pagar dari seng Gelombang ( 1,80 mtr/2 ) - Seng gelombang ( 180 x 90 x 0,2 ) = 2.00 lembar - Kaso 5/7 = 2.50 batang - Paku - Cat - Pekerja = 0.06 KG. = 1.00 KG. = 0.75 11,050.00 6,319.00 2,600.00 9,100.00 9,750.00 13,000.00 22,100.00 15,798.00 156.00 9,100.00 7,313.00 975.00 55,442.00 Harga pagar pengaman per meter = Rp. 72.45/1,80 = Rp.40.25,karena dianggap 3 kali pakai rusak maka harga pagar pengaman /meter menjadi Rp.40.040/3 Catatan : - HS. Angkutan kabel TM sesuai HS.Biaya Jasa Angkutan - Rp. 193.400,- HS.Sipil No.143 - Rp.14.365,- HS.DKI Hal.118/11035 - 1/3 Direksi Keet dianggap 3 kali pakai Rp.11.830,- HS DKI Hal. 111/6001 - 1/2 Direksi Keet dianggap 2 kali pakai - Rp.2.600 HS.DKI Hal.118-12001 - Rp.8.215 = Rp.591.500/72 batang - HS.DKI Hal.108 - 3027 XIII DOKUMENTASI a Foto dokumentasi 2 x 36 lembar berwarna - Film = 1 rool - Cuci film = 1 roll - Cetak 2 x 36 = 72 lembar 10,400.00 2,600.00 520.00 10,400.00 2,600.00 37,440.00 148,772.00 148,772.00 148,772.00 396,725.00 595,088.00 1,190,176.00 396,725.00 595,088.00 1,190,176.00 86,125.00 105,625.00 105,625.00 160,225.00 160,255.00 290,225.00 86,125.00 105,625.00 105,625.00 160,225.00 160,255.00 290,225.00 65.00 65.00 65.00

- Tukang Kayu = 0.075

50,440.00 b Foto dokumentasi perlembar berwarna - Film = 1 rool - Cuci film = 1 roll - Cetak 1 x 36 = 72 lembar c As.build drawing 1 : 200 (1 kalkir + 5 blue print + 1 film ) Sesuai panjang galian, kanal dan crossing. - Mengambar 1 km Trace - Tenaga Ahli Muda (D - 2) = 2 jam/ 1 orang - Petugas Survey (E - 5) = 8 jam/1 orang - Pekerja = 2 Orang - Tukang Gambar ( E - 5 ) = 32 Jam - Kertas kalkir ukuran = - Cetak Blue Print 0.30 x 5 = 5 lembar 11,089.00 9,620.00 9,750.00 9,620.00 3,900.00 3,120.00 19,500.00 22,178.00 76,960.00 19,500.00 307,840.00 19,500.00 15,600.00 97,500.00 559,078.00 Biaya Menggambar / Meter = 559.078/1.000 = d As.Build Drawing 1:5000 (1 kalkir + 5 blue print) print gambar spindle - Tenaga Ahli Muda ( D - 2 ) = 1 jam /1 Orang - Tukang Gambar (E - 5 ) = 16 Jam/1 Orang 1 - Kertas Kalkir Ukuran = 1 Meter - Cetak Blue Print Catatan (*) - Rp.10.400,- Hs.DKI Hal.122 - 15001 - Rp.2.600,- Hs.DKI Hal.122 - 15002 - Rp.520,- Hs.DKI Hal.122 - 15003 11,089.00 9,620.00 13,000.00 3,900.00 1,950.00 11,089.00 153,920.00 13,000.00 3,900.00 9,750.00 191,659.00 559.00 10,400.00 2,600.00 520.00 10,400.00 2,600.00 18,720.00 31,720.00

50,440.00

881.00

- Cetak film Ukuran = 0.30 x 5

559.00

191,659.00

0.65

0.72

5.835

0.825

3.12

3713.3 11139.9

0.65

1.5 14196 5569.5

9 14197.5

10504 15756

33585.72

0.072

0.096

0.06 0.44 0.32 0.39981273

0.03

10812.1

ASOSIASI KONTRAKTOR LISTRIK DAN MEKANIKAL INDONESIA ANALISA HARGA SATUAN PEKERJAAN : SALURAN UDARA TEGANGAN MENENGAH Belum termasuk resiko,over head,keuntungan 10% dan PPN 10% 2004 HARGA NO URAIAN PEKERJAAN 1 I 1 1.a 2 PEKERJAAN PEMASANGAN TIANG TUNGGAL Tiang besi 11 meter 200 daN -Mendirikan Tiang 1.b 1/3 Teknisi 2 Tukang Tiang besi 11 meter 350 daN -Mendirikan Tiang 1/3 Teknisi 2 1/3 Tukang 1.c Tiang besi 11 meter 500 daN -Mendirikan Tiang 1/2 Teknisi 3 1/2 Tukang 1.d Tiang besi 13 meter 350 daN -Mendirikan Tiang 1/2 Teknisi 3 1/2 Tukang 1.e Tiang besi 13 meter 500 daN -Mendirikan Tiang 1/2 Teknisi 4 Tukang 1.f Tiang beton 11 meter 200 daN -Mendirikan Tiang 1/2 Teknisi 4 1/2 Tukang 1.g Tiang beton 11 meter 350 daN -Mendirikan Tiang 1/2 Teknisi 5 1/2 Tukang 1.h Tiang beton 11 meter 500 daN Tiang beton 11 meter 350 daN -Mendirikan Tiang 1.i 1/2 Teknisi 6 Tukang Tiang beton 11 meter 800 daN -Mendirikan Tiang 1/2 Teknisi 6 Tukang 1.j Tiang beton 13 meter 350 daN -Mendirikan Tiang 1/2 Teknisi 7 Tukang 1.k Tiang beton 13 meter 500 daN 56,250 32,250 28,125.00 225,750.00 253,875.00 253,870.00 56,250 32,250 56,250 32,250 28,125.00 193,500.00 221,625.00 28,125.00 193,500.00 221,625.00 221,620.00 221,620.00 56,250 32,250 28,125.00 177,375.00 205,500.00 205,500.00 56,250 32,250 28,125.00 145,125.00 173,250.00 173,250.00 56,250 32,250 28,125.00 129,000.00 157,125.00 157,120.00 56,250 32,250 28,125.00 112,875.00 141,000.00 141,000.00 56,250 32,250 28,125.00 112,875.00 141,000.00 141,000.00 56,250 32,250 56,250 32,250 18,750.00 64,500.00 83,250.00 18,750.00 75,250.00 94,000.00 94,000.00 83,250.00 SATUAN (Rp.) 3 (Rp.) 4 BIAYA JUMLAH DIBULATKAN (Rp.) 5

-Mendirikan Tiang

1/2 Teknisi 7 Tukang

56,250 32,250

28,125.00 225,750.00 253,875.00 253,870.00

2 3 3.a

PEMASANGAN TIANG BESI & BETON DOUBLE ( 2 X Biaya Pemasangan Tiang Tunggal ) PEMBUATAN PONDASI TIANG BESI & BETON Pondasi Tiang 11 meter Type A - Galian tanah biasa/rumput M3 0.9 - Sirtu dipadatkan - Beton block 1:2:3 - Urugan pasir 0.67 M3 0.03 M3 0.03 M3 20,386 49,959 687,193 49,959 18,347.54 33,472.53 20,615.79 1,498.77 73,934.63 73,930.00 - Galian Tanah biasa/Rumput - Urugan Tanah Biasa/rumput - Pemadatan

3.b

Pondasi Tiang 11 meter Type B - Galian tanah biasa/rumput M3 0.6 - Beton Tumbuk 1:2:3 0.47 M3 - Beton block 1:2:3 - Urugan pasir 0.03 M3 0.03 M3 20,386 216,242 687,193 49,959 12,231.69 101,633.74 20,615.79 1,498.77 135,979.99 135,970.00

3.c

Pondasi Tiang 11 meter Type C - Galian tanah biasa/rumput M3 0.08 - Beton Tumbuk 1:2:3 0.67 M3 - Beton block 1:2:3 - Urugan pasir 0.03 M3 0.03 M3 20,386 216,242 687,193 49,959 1,630.89 144,882.14 20,615.79 1,498.77 168,627.59 173,300.00

3.d

Pondasi Tiang 11 meter Type D - Galian tanah biasa/rumput M3 0.8 - Beton Tumbuk 1:2:3 0.47 M3 - Beton block 1:2:3 - Urugan pasir 0.1 M3 0.03 M3 20,386 216,242 687,193 49,959 16,308.92 101,633.74 68,719.30 1,498.77 188,160.73 188,160.00

3.e

Pondasi Tiang 11 meter Type E - Galian tanah biasa/rumput M3 0.8 - Beton Tumbuk 1:2:3 0.67 M3 - Beton block 1:2:3 - Urugan pasir 0.2 M3 0.03 M3 20,386 216,242 687,193 49,959 16,308.92 144,882.14 137,438.60 1,498.77 300,128.43 290,120.00

3.f

Pondasi Tiang 13 meter Type A - Galian tanah biasa/rumput M3 0.9 - Beton Tumbuk 1:2:3 0.78 M3 - Beton block 1:2:3 - Urugan pasir 0.03 M3 0.03 M3 20,386 216,242 687,193 49,959 18,347.54 168,668.76 20,615.79 1,498.77 209,130.86 68,170.00

3.g

Pondasi Tiang 13 meter Type B - Galian tanah biasa/rumput M3 0.9 - Beton Tumbuk 1:2:3 0.54 M3 - Beton block 1:2:3 - Urugan pasir 0.03 M3 0.03 M3 20,386 216,242 687,193 49,959 18,347.54 116,770.68 20,615.79 1,498.77 157,232.78 145,980.00

3.h

Pondasi Tiang 13 meter Type C

- Galian tanah biasa/rumput M3 0.9 - Beton Tumbuk 1:2:3 0.78 M3 - Beton block 1:2:3 - Urugan pasir 3.i 0.03 M3 0.03 M3

20,386 216,242 687,193 49,959

18,347.54 168,668.76 20,615.79 1,498.77 209,130.86 197,880.00

Pondasi Tiang 13 meter Type D - Galian tanah biasa/rumput M3 0.9 - Beton Tumbuk 1:2:3 0.54 M3 - Beton block 1:2:3 - Urugan pasir 0.1 M3 0.03 M3 20,386 216,242 687,193 49,959 18,347.54 116,770.68 68,719.30 1,498.77 205,336.29 194,080.00

3.j

Pondasi Tiang 13 meter Type E - Galian tanah biasa/rumput M3 0.9 - Beton Tumbuk 1:2:3 0.78 M3 - Beton block 1:2:3 - Urugan pasir 0.2 M3 0.03 M3 20,386 216,242 687,193 49,959 18,347.54 168,668.76 137,438.60 1,498.77 325,953.67 314,700.00

3.k 4 4.a 4.b 4.c 4.d 4.e 4.f 4.g 4.h 4.i 4.j 4.k 4.l 4.m 4.n 4.o 4.p 5 5.a

PEMASANGAN TIANG BESI & BETON DOUBLE ( 2 X Biaya pemasangan Tiang Tunggal ) PEKERJAAN PENGECATAN TIANG BESI ( Pek. Pemeliharaan ) Tiang Besi 11 Meter 200 daN 5.09 M2 Tiang Besi 11 Meter 350 daN 5.48 M2 Tiang Besi 11 Meter 500 daN 5.84 M2 Tiang Besi 11 Meter 800 daN 6.99 M2 Tiang Besi 11 Meter 1200 daN M2 8.31 Tiang Besi 11 Meter 200 daN Double 10.18 M2 Tiang Besi 11 Meter 200 daN Double 10.96 M2 Tiang Besi 11 Meter 200 daN Double 11.68 M2 Tiang Besi 13 Meter 200 daN 6.17 M2 Tiang Besi 13 Meter 350 daN 6.88 M2 Tiang Besi 13 Meter 500 daN 8.68 M2 Tiang Besi 13 Meter 800 daN 8.50 M2 Tiang Besi 13 Meter 1200 daN 10.12 M2 Tiang Besi 13 Meter 200 daN Double 12.34 M2 Tiang Besi 13 Meter 350 daN Double 13.76 M2 Tiang Besi 13 Meter 500 daN Double 17.36 M2 PEMASANGAN / PENGADAAN TRAVERS Travers tunggal: UNP 12-1800 mm - Pemasangan - Pengadaan 1/12 Teknisi 2/3 Tukang 1 Buah 56,250 40,500 39,000 4,687.50 27,000.00 39,000.00 70,687.50 70,680.00 10,257 10,257 10,257 10,257 10,257 10,257 10,257 10,257 10,257 10,257 10,257 10,257 10,257 10,257 10,257 10,257 52,208.00 56,208.00 59,901.00 71,696.00 85,236.00 104,416.00 112,417.00 119,802.00 63,286.00 70,568.00 68,517.00 87,185.00 103,801.00 126,571.00 141,136.00 178,062.00 52,210.00 56,210.00 59,900.00 71,700.00 85,240.00 104,420.00 112,420.00 119,800.00 63,290.00 70,570.00 68,520.00 87,190.00 103,800.00 126,570.00 141,140.00 178,060.00

5.b

Travers tunggal: UNP 12-2200 mm - Pemasangan - Pengadaan 1/6 Teknisi 1 1/2 Tukang 1 Buah 56,250 40,500 49,634 9,375.00 60,750.00 49,634.00 119,759.00 119,750.00

5.c

Travers tunggal: UNP 12-2400 mm - Pemasangan 1/6 Teknisi 1 1/2 Tukang 56,250 40,500 9,375.00 60,750.00

- Pengadaan 5.d

1 Buah

54,600

54,600.00 124,725.00 124,720.00

Pemasangan Suspensi Assembly 1/12 Teknisi 1/4 Tukang 1/2 Pekerja 56,250 40,500 32,250 4,687.50 10,125.00 16,125.00 30,937.50 30,930.00

5.e

Pemasangan Small Angle Assembly 1/12 Teknisi 1/3 Tukang 2/3 Pekerja 56,250 40,500 32,250 4,687.50 13,500.00 21,500.00 39,687.50 39,680.00

5.f

Pemasangan Large Angle Assembly 1/12 Teknisi 1/3 Tukang 1/2 Pekerja 56,250 40,500 32,250 4,687.50 13,500.00 16,125.00 34,312.50 34,310.00

5.g

Pemasangan Daed End Assembly 1/12 Teknisi 1/3 Tukang 1/2 Pekerja 56,250 40,500 32,250 4,687.50 13,500.00 16,125.00 34,312.50 34,310.00

6

PEMASANGAN PIN ISOLATOR - Pemasangan 1/10 Teknisi 1/10 Tukang 56,250 40,500 5,625.00 4,050.00 9,675.00 9,670.00

7

PEMASANGAN HANG ISOLATOR - Pemasangan 1/8 Teknisi 1/8 Tukang 56,250 40,500 7,031.25 5,062.50 12,093.75 12,090.00

8

PEMASANGAN POLE TOP SWITCH - Pemasangan 1 Teknisi 6 Tukang 2 Pekerja 56,250 40,500 32,250 56,250.00 243,000.00 64,500.00 363,750.00 363,750.00

9

PEMASANGAN PIPA ARDE (1,5 Inc per 6 mtr) per batang 26,000 PENGADAAN PIPA ARDE (1,5 Inc per 6 mtr) per batang 50,718

26,000.00 50,718.00 76,718.00 76,720.00

10 10.a

PENARIKAN KAWAT HANTARAN/Gawang (Jarak Mx.40 m) Kawat A3C 3 x 35 s/d 150 mm2 - Penarikan 1/3 Teknisi 2 Tukang 1 1/3 Pekerja 56,250 40,500 32,250 18,750.00 81,000.00 43,000.00 142,750.00 142,750.00

10.b

Kawat A3C 3 x 35 s/d 150 mm2 - Penarikan 1/2 Teknisi 3 Tukang 2 Pekerja 56,250 40,500 32,250 28,125.00 121,500.00 64,500.00 214,125.00 214,120.00

10.c

SUTM Twisted Kabel 20 kV

- Penarikan

1/2 Teknisi 4 Tukang 5 Pekerja

56,250 40,500 32,250

28,125.00 162,000.00 161,250.00 351,375.00 351,370.00 187,343.00

10.d 10.e

Pemasangan Terminal Outdoor 150 S/D 300 mm2/Set(=HS.SKTM) Pemasangan Kawat Pengikat Hantaran Isolator 1/10 Tukang 11 PEMASANGAN JUMPE /PHASE - Mandor Pengawas - Tukang - Pekerja 1/12 Teknisi 1/12 Tukang 1/12 Pekerja 56,250 40,500 32,250 4,687.50 3,375.00 2,687.50 10,750.00 12 PEMASANGAN LBS TIANG SUTM - Tenaga Ahli Muda 1/2 Hari 4 Tukang 2 Pekerja - Sewa Crane 6 Jam 112,500 40,500 32,250 39,000 56,250.00 162,000.00 64,500.00 234,000.00 516,750.00 13 PENGADAAN DAN PEMASANGAN TANDA KILAT 20MKV ( 20 cm X 30 cm ), Tebal Plat 4mm - Pengadaan - Ongkos pasang 11,050 1,950 11,050.00 1,950.00 13,000.00 14 PENGADAAN DAN PEMASANGAN PENGHALANG PANJAT - Pengadaan - Ongkos pasang - Pengelasan + Bahan 15 PEMASANGAN ARRESTER DAN PENGADAAN DUDUKAN - Tenaga Ahli Muda - Tukang - Pekerja - Dudukan Arrester - Angkutan 1/8 Hari 1 Tukang 1/2 Pekerja 1 set 1/2 Rit 112,500 40,500 32,250 56,628 65,000 14,062.50 40,500.00 16,125.00 56,628.00 32,500.00 159,815.50 16 PEMASANGAN CUT OUT DAN PENGADAAN DUDUKAN - Tenaga Ahli Muda - Tukang - Pekerja - Dudukan Arrester - Angkutan 1/8 Hari 1 Tukang 1/2 Pekerja 1 set 1/2 Rit 112,500 40,500 32,250 56,628 65,000 14,062.50 40,500.00 16,125.00 56,628.00 32,500.00 159,815.50 29,445 1,950 29,445.00 1,950.00 31,395.00 40,500 4,050.00

4,050.00

10,750.00

516,750.00

13,000.00

31,400.00

159,810.00

159,810.00

16A

PEMASANGAN TREE GUARD 1 GAWANG - Teknisi - Instalator - Pekerja 1/3 Teknisi 1 1/3 Tukang 1 1/3 Pekerja 56,250 40,500 32,250 18,750.00 54,000.00 43,000.00 115,750.00 17 PEMELIHARAAN JARINGAN - Majun 1/4 Kg 8,000 75,000 2,000.00 37,500.00 - YC 8513 type G658SF6 Ltr 1/2 115,750.00

- Pasline - Mandor Pengawas - Angkutan

1/4 Kg 1/2 Teknisi 1/2 Rit

87,500 56,250 65,000

21,875.00 28,125.00 32,500.00 122,000.00 122,000.00

18 PEMELIHARAAN CUT OUT - Majun - Pasline - Mandor Pengawas - Angkutan 1/25 Kg 1/4 Kg 1/3 Teknisi 1/3 Rit 8,000 75,000 87,500 56,250 65,000 320.00 22,500.00 21,875.00 18,750.00 21,666.67 85,111.67 19 PEMELIHARAAN GARDY/BOX SEKERING - Majun - Pasline - Mandor Pengawas - Angkutan 1/4 Kg 1/4 Kg 1/2 Teknisi 1/2 Rit 8,000 75,000 87,500 56,250 65,000 2,000.00 37,500.00 21,875.00 28,125.00 32,500.00 122,000.00 20 PEMELIHARAAN RAK TR PADA GARDU PORTAL - Majun -Spirtus - Pasline - Mandor Pengawas - Tukang - Pekerja 1/4 Kg 1/2 Ltr 1/4 Kg 1/2 Teknisi 2 Tukang 2 Pekerja 8,000 7,150 87,500 56,250 40,500 32,250 2,000.00 3,575.00 21,875.00 28,125.00 81,000.00 64,500.00 201,075.00 21 PEMELIHARAAN LBS di SUTM - Majun - Pasline - Mandor Pengawas - Tukang - Pekerja 1/4 Kg 1/4 Kg 1/2 Teknisi 1/2 Tukang 1/2 Pekerja 8,000 75,000 87,500 56,250 40,500 32,250 2,000.00 37,500.00 21,875.00 28,125.00 20,250.00 16,125.00 125,875.00 22 PENGADAAN DAN PEMASANGAN NOMOR GARDU - Pengadaan - Ongkos Pasang II 1 PEKERJAAN PEMBONGKARAN PEMBONGKARAN TIANG BESI DAN BETON ( sama dengan biaya pemasangan ) 2 PEMBONGKARAN TIANG BESI DAN BETON dengan pemas tiang sama DOUBLE ( sama dengan biaya pemasangan ) double yang sesuai ukuran 3 4 PEMBONGKARAN LBS TIANG SUTM ( sama dengan biaya pasang ) sama dgn by pemasangan PEMBONGKARAN ARRESTER - Mandor Pengawas - Tukang - Pekerja 1/6 Teknisi 1/3 Tukang 1/6 Pekerja 56,250 40,500 32,250 9,375.00 13,500.00 5,375.00 20,580.00 26,936 1,950 26,936.00 1,950.00 28,886.00 28,890.00 125,870.00 - YC 8513 type G658SF6 Ltr 1/2 201,070.00 122,000.00 - YC 8513 type G658SF6 Ltr 1/2 85,110.00 - YC 8513 type G658SF6 Ltr 3/10

- Angkutan 5

1/6 Rit

65,000

10,833.33 39,083.33 39,080.00

PEMBONGKARAN CUT OUT - Mandor Pengawas - Tukang - Pekerja - Angkutan 1/6 Teknisi 1/3 Tukang 1/6 Pekerja 1/6 Rit 56,250 40,500 32,250 65,000 9,375.00 13,500.00 5,375.00 10,833.33 39,083.33 39,080.00

6

PEMBONGKARAN RAK TR PADA GARDU PORTAL - Mandor Pengawas - Tukang - Pekerja 1/2 Teknisi 2 Tukang 1 Pekerja 56,250 40,500 32,250 28,125.00 81,000.00 32,250.00 141,375.00 141,370.00

7

PENGISIAN MINYAK TRAFO 1/2 Teknisi 1/2 Tukang 1/4 Pekerja

56,250 40,500 32,250

28,125.00 20,250.00 8,062.50 56,437.50 56,430.00

8

PEMBONGKARAN TERMINATING OUTDOOR 56,250 1/2 Teknisi 1/2 Tukang 1/4 Pekerja 40,500 32,250

28,125.00 20,250.00 8,062.50 56,437.50 56,430.00 4,290.00 5,370.00 92,060.00 159,430.00 55,900.00 85,800.00 134,550.00

9 10 11 12 13 14 15 III. 1 1.a

Bongkar PIN ISOLATOR Bongkar Arde Bongkar Pole Top Switch Bongkar SUTM A3C Bongkar SUTM A3CS Bongkar SUTM Twisted

= biaya pasang x 1.2 3,575 =Biaya pasang x 126,713 7 = Biaya pasang x 1.2 132,860 = Biaya Pasang x 1.26,579 4 = Biaya Pasang x 1.21,500 7 = Biaya Pasang x 1.2 122,125

4,290.00 5,366.00 92,056.00 159,432.00 55,895.00 85,800.00 134,550.00

Bonkar HANG ISOLATOR = Biaya pasang x 1.2 4,472

PEKERJAAN PERBAIKAN PERBAIKAN TIANG BESI/BETON MIRING BERIKUT PONDASI Pondasi Tiang 11 meter Type A - Galian tanah biasa/rumput m3 0.63 - Sirtu dipadatkan 0.55 m3 20,386 49,959 12,843.27 27,477.45 40,320.72 40,320.00

1.b

Pondasi Tiang 11 meter Type B - Galian tanah biasa/rumput m3 0.55 - Beton Tumbuk 1:2:3 0.33 m3 20,386 216,242 11,212.38 71,359.86 82,572.24 82,570.00

1.c

Pondasi Tiang 11 meter Type C - Galian tanah biasa/rumput m3 0.65 - Beton Tumbuk 1:2:3 0.47 m3 20,386 216,242 13,251.00 101,633.74 114,884.74 114,880.00

1.d

Pondasi Tiang 11 meter Type D - Galian tanah biasa/rumput m3 0.56 - Beton Tumbuk 1:2:3 0.33 m3 20,386 216,242 11,416.24 71,359.86 82,776.10 82,770.00

1.e

Pondasi Tiang 11 meter Type E

- Galian tanah biasa/rumput m3 0.56 - Beton Tumbuk 1:2:3 0.47 m3 1.f Pondasi Tiang 13 meter Type A - Galian tanah biasa/rumput m3 0.63 - Sirtu dipadatkan 1.g 0.55 m3

20,386 216,242

11,416.24 101,633.74 113,049.98 113,040.00

20,386 49,959

12,843.27 27,477.45 40,320.72 40,320.00

Pondasi Tiang 13 meter Type B - Galian tanah biasa/rumput m3 0.42 - Beton Tumbuk 1:2:3 0.38 m3 20,386 216,242 8,562.18 82,171.96 90,734.14 90,730.00

1.h

Pondasi Tiang 13 meter Type C - Galian tanah biasa/rumput m3 0.63 - Beton Tumbuk 1:2:3 0.55 m3 20,386 216,242 12,843.27 118,933.10 131,776.37 131,770.00

1.i

Pondasi Tiang 13 meter Type D - Galian tanah biasa/rumput m3 0.63 - Beton Tumbuk 1:2:3 0.38 m3 20,386 216,242 12,843.27 82,171.96 95,015.23 95,010.00

1.j

Pondasi Tiang 13 meter Type E - Galian tanah biasa/rumput m3 0.56 - Beton Tumbuk 1:2:3 0.47 m3 20,386 216,242 11,416.24 101,633.74 113,049.98 113,040.00

2

PERBAIKAN KAWAT KENDOR A3C 3x35 s/d 150 mm2 ( 3 Hantaran ) -Perbaikan 1 s/d 5 Gawang 1.2 Pasang -Perbaikan 6 s/d 10 Gawang1.1 Pasang 46,579 46,579 55,895.00 55,895.00 55,900.00 55,900.00

3

PERBAIKAN KAWAT KENDOR A3C3 3x35 s/d 150 mm2 ( 3 hantaran ) - Perbaikan 1 s/d 5Gawang 1.2 Pasang - Perbaikan 6 s/d 10 Gawang.1 Pasang 1 89,375 89,375 107,250.00 98,313.00 107,250.00 98,310.00

4

PERBAIKAN SUTM TWISTED 3x70 s/d 90 MM2 ( Gawang ) - Perbaikan 1 s/d 5Gawang 1.2 Pasang - Perbaikan 6 s/d 10 Gawang.1 Pasang 1 112,125 112,125 134,550.00 134,550.00 134,550.00 134,550.00

5

PERBAIKAN JEMPER SUTM/ Phase - Tenaga Ahli Muda 3/8 Hari 0.66 Tukang 112,500 40,500 42,187.50 26,730.00 68,917.50 68,910.00 10,020.00 22,200.00 22,200.00 3,580.00

6 7 8 9 IV 1

PERBAIKAN TRAVES UNP 12 - 1800 mm sama dengan pasang 10,023 10,023.00 PERBAIKAN TRAVES UNP 12 - 2200 mm sama dengan pasang 22,204 22,204.00 PERBAIKAN TRAVES UNP 12 - 2400 mm sama dengan pasang 22,204 22,204.00 PERBAIKAN ISOLATOR TUMPU MIRING sama dengan pasang 3,575 3,575.00 LAIN - LAIN PEMBERSIH BENAMG LAYANGAN SUTM/GAWANG - Pembersihan 1/5 Teknisi 2/5 Tukang 56,250 40,500 11,250.00 16,200.00

27,450.00 2 PEMANGKASAN CABANG POHON SUTM/GAWANG - Pemangkasan 1/5 Teknisi 4/5 Tukang 1 1/3 Pekerja 3 FOTO DOKUMENTASI : 36 LEMBAR 1 Rol Film 1 Cuci Film 1 Cetak 2x 1/ 10,400 1/ 36/ 2,600 520 56,250 40,500 32,250 11,250.00 32,400.00 43,000.00 86,650.00 10,400.00 2,600.00 18,720.00 31,720.00

27,450.00

86,650.00

31,720.00

= = =

0.65 m3 0.4 m3 0.4 m2

ASOSI