Harga Transportas Jaln Pg 19sd38

download Harga Transportas Jaln Pg 19sd38

of 160

Transcript of Harga Transportas Jaln Pg 19sd38

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    1/160

    PID

    602

    603

    605

    606

    607

    608

    609

    610

    611

    612

    613

    614615

    616

    617

    618

    619

    620

    621

    622

    623

    624

    625626

    627

    628

    632

    401

    402

    403

    404

    405

    406

    407

    408

    409

    410

    411

    412

    413

     

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    2/160

    414

    415

    416

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    3/160

    NAMA PEKERJAAN

    Pengadaan & Pemasangan Rambu Lalu Lintas di Jalan (uk. 7575 !m" (bua#"

    Pengadaan & Pemasangan Rambu Lalu Lintas di Jalan (uk. 9090 !m" (bua#"

    Pengadaan & Pemasangan Rambu Penda#ulu Penun$uk Ju%usan (uk. 120180 !m" (bua#"

    Pengadaan & Pemasangan Rambu Penda#ulu Penun$uk Ju%usan (uk. 120240 !m" (bua#"

    Pengadaan & Pemasangan Rambu Penda#ulu Penun$uk Ju%usan P%tal 'entang 18 m (bua#"

    Pengadaan & Pemasangan Paga% Pengaman Jalan (4 m" )*e 2+ e%minal ,nd Lengkung

    Pengadaan & Pemasangan -a%ka Jalan (uk. 3120 mm" (#e%m*lasti!"

    Pengadaan & Pemasangan -a%ka Jalan (uk. 3120 mm" (ld*lasti!"

    Pengadaan & Pemasangan Paku Jalan (uk. 10102 !m"

    Pengadaan & Pemasangan Paku Jalan (uk. 10152"Pengadaan & Pemasangan Paku Jalan 'ulat (tem*e%ed"

    Pengadaan & Pemasangan Paku Jalan enaga /u%)a (/la% ell"

    Pengadaan & Pemasangan Lam*u Pe%ingatan (a%ning Lig#t"

    Pengadaan & Pemasangan Lam*u Pe%ingatan enaga /u%)a (a%ning Lig#t /la% ell" iang Lu%us

    Pengadaan & Pemasangan lat Pengendali s)a%at Lalu Lintas 3 (iga" Pe%sim*angan

    Pengadaan & Pemasangan lat Pengendali s)a%at Lalu Lintas 4 (,m*at" Pe%sim*angan

    Pengadaan & Pemasangan Patk ikungan Pi*a Plastik

    Pengadaan & Pemasangan Patk ikungan Pi*a 'esi

    Pengadaan & Pemasangan e%min ikungan

    Pengadaan & Pemasangan lat Pengendali s)a%at Lalu Lintas enaga /u%)aPengadaan & Pemasangan lat Pengendali s)a%at Lalu Lintas enaga /u%)a /im*ang 3

    Pengadaan & Pemasangan LPJ nensinal

    Pengadaan & Pemasangan LPJ /la% ell

    Pembangunan e%maga Pen)ebe%angan + Peke%$aan Pe%sia*an

    Pembangunan e%maga Pen)ebe%angan + nst%uksi ausea) (108.72 -2"

    Pembangunan e%maga Pen)ebe%angan + %estle (43225 -2"

    Pembangunan e%maga Pen)ebe%angan + udukan %estle butment

    Pembangunan e%maga Pen)ebe%angan + udukan -eable '%idge

    Pembangunan e%maga Pen)ebe%angan + -%ing l*#in

    Pembangunan e%maga Pen)ebe%angan + '%easting l*#in

    Pembangunan e%maga Pen)ebe%angan + nst%uksi udukan :id%lik

    Pembangunan e%maga Pen)ebe%angan + nst%uksi Pelindung -'

    Pembangunan e%maga Pen)ebe%angan + atalk

    Pembangunan e%maga Pen)ebe%angan + nst%uksi udukan dan Ruang nt%l

    Pembangunan e%maga Pen)ebe%angan + Ruma# nt%l

    REKAP HARGA SATUAN

    BIDANG FASILITAS KESELAMATAN TRANSPORTASI J

    Pengadaan & Pemasangan Paga% Pengaman Jalan (4 m" )*e 1 + e%minal ,nd -asuk ke alam ana#

    Pengadaan & Pemasangan Paga% Pengaman Jalan (engan Rambu #e%n" )*e 1 + e%minal ,nd-asuk ke alam ana#

    Pengadaan & Pemasangan Lam*u Pe%ingatan enaga /u%)a (a%ning Lig#t /la% ell" iangLengkung

    Pengadaan & Pemasangan Paga% Pengaman Jalan (engan Rambu #e%n" )*e 2 + e%minal ,ndLengkung

    Pembangunan e%maga Pen)ebe%angan + Pembuatan Jalan dan La*angan Penet%asi enganlakan (L;2.150 -2 ,'L ; 7 -"

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    4/160

    Pembangunan e%maga Pen)ebe%angan + Pembangunan -eable '%idge

    Pembangunan e%maga Pen)ebe%angan + :id%lik

    Pembangunan e%maga Pen)ebe%angan + Lam*u Pene%angan

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    5/160

    HARGA SATUAN SATUAN

    1487868 bua#

    2076518 bua#

    13557078

    14255859

    132671038

    9768939

    12306982

    6877023 bua#

    35.062 bua#

    37.949 bua#

    286.265 bua#

    294.74 bua#305.894 bua#

    596.841 bua#

    57643602 bua#

    36273465 bua#

    43148465

    185460495 bua#

    214850155 bua#

    825.974 bua#

    655.474 bua#

    5418966 bua#

    416605724 bua#393904221 bua#

    16550166 bua#

    38376239 bua#

    11067339

    1540882233 *aket

    5990015 m2

    9669150 m2

    566495636 bua#

    2525519577 bua#

    1043059229 bua#

    3072839329 bua#

    1254624010 bua#

    802685723 bua#

    32078014 m2

    253527144 bua#

    8447354 m2

    669114902

      LAN

    bua#

    bua#

    bua#

    bua#

    bua#

    bua#

    bua#

    m2

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    6/160

    29767898 m2

    6811267575 *aket

    358231720 *aket

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    7/160

    *id ansid egiatan nit

    Pengadaan & Pemasangan Rambu Lalu Ln!as d Jalan "u#$ %'% (m) "bua*)

    602 8012 Pengadaan 'a#an *kt

    602 8005 at belakang daun %ambu m2

    602 8004 Pemtngan dan *engeb%an unit

    602 8002 Pengelasan !m

    602 8003 Pe%akitan dan *en)etelan unit

    602 193 % *ndasi betn m3

    602 8001

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    8/160

    607 8019 Pengadaan 'a#an *kt

    607 23

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    9/160

     JUMLAH TOTAL

    Harga per- Buah

    Pengadaan & Pemasangan Ma0#a Jalan "u#$ :'+1, mm) "84ld6las!()

    612 8024 Pengadaan & Pemasangan -a%ka Jalan *aket

    612 8052 =ngks *enge!atan ma%ka m?

     JUMLAH

    PPN +, -

     JUMLAH TOTAL

    Harga per- Buah

    Pengadaan & Pemasangan Pa#u Jalan "u#$ +,'+,'1 (m)

    613 8025 Pengadaan 'a#an set

    613 8027 Pengeb%an dan *emasangan *aku $alan ls

    613 8010 =ngks angkut ke lkasi ls

     JUMLAH

    PPN +, -

     JUMLAH TOTAL

    Harga per- Buah

    Pengadaan & Pemasangan Pa#u Jalan "u#$ +,'+'1)

    614 8026 Pengadaan 'a#an set

    614 8027 Pengeb%an dan *emasangan *aku $alan ls

    614 8010 =ngks angkut ke lkasi ls

     JUMLAH

    PPN +, -

     JUMLAH TOTAL

    Harga per- Buah

    Pengadaan & Pemasangan Pa#u Jalan Bula! "!em6e0ed)

    615 8028 Pengadaan 'a#an set

    615 8053 Pengeb%an dan *emasangan *aku $alan ls

    615 8010 =ngks angkut ke lkasi ls

     JUMLAH

    PPN +, -

     JUMLAH TOTAL

    Harga per- Buah

    Pengadaan & Pemasangan Pa#u Jalan Tenaga Su05a "S4la0 8ell)616 8029 Pengadaan 'a#an set

    616 8027 Pengeb%an dan *emasangan *aku $alan ls

    616 8010 =ngks angkut ke lkasi ls

     JUMLAH

    PPN +, -

     JUMLAH TOTAL

    Harga per- Buah

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    10/160

    Pengadaan & Pemasangan Lam6u Pe0nga!an ";a0nng Lg*!)

    617 8030 Pengadaan 'a#an set

    617 8032 Penggela%an kabel m

    617 8033 Penanaman *i*a *elindung m

    617 8034

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    11/160

    620 8035 @

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    12/160

     JUMLAH TOTAL

    Harga per- Buah

    Pengadaan & Pemasangan Pa!4# T#ungan P6a Bes

    623 8041 Pengadaan 'a#an set

    623 193 % *ndasi betn m3

    623 8001

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    13/160

    Pengadaan & Pemasangan Ala! Pengendal Is5a0a! Lalu Ln!as Tenaga Su05a Sm6ang :

    626 8045 Pengadaan 'a#an set

    626 Pemasangan

    626 8001 @

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    14/160

    632 8001

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    15/160

    402 5007 @@'etn %ailling *st m3

    402 @Peke%$aan 'etn @175

    402 5009 @@Lantai ke%$a dibaa# lantai m3

    402 5009 @@'etn tumbuk untuk t%ta% m3

    402 @ La*isan *asi%

    402 5014 @@La*isan *asi% t; 10!m dibaa# lantai ke%$a m3

    402 5014 @@La*isan *asi% dibaa# t%ta% m3

    402 5015 @Railling

    2.5H t; 3mm m?/pp402 5012 @La*isan *e%mukaan da%i as*alt *asi% t;7!m m2/pp402 3027 @'esi siku L 100.100.8 (:t i* alaniCed" untuk eletasi m?/pp JUMLAH/ppPPN +, -/pp JUMLAH TOTAL/ppHarga per- M2/ppPembangunan De0maga Pen5ebe0angan 7 T0es!le "3:1=1 M1)/pp403 =A/R/ R,/L, (43225 -2"/pp403 @'etn be%tulang @225 untuk *lat lantai (12665 m3" m3/pp403 135 m3/pp403 145 @@Pasang bekisting untuk *lat lantai m2/pp403 149 @@Pembesian engan 'esi li% .32 kg/pp403 5054 ls$am/pp403 @'etn be%tulang @225 untuk balk (5621 m3"/pp403 135 m3/pp403 144 @@Pasang bekisting untuk balk m2/pp403 149 @@Pembesian engan 'esi li% .32 kg/pp403 5054 ls$am/pp403 @'etn be%tulang @225 untuk tiang %ailling (162 m3" m3/pp403 135 m3/pp403 144 @@Pasang bekisting untuk balk m2/pp403 149 @@Pembesian engan 'esi li% .32 kg/pp403 5054 ls$am/pp403 @'etn be%tulang @225 untuk !ansteen (42 m3"/pp403 135 m3/pp403 144 @@Pasang bekisting untuk balk m2/pp403 149 @@Pembesian engan 'esi li% .32 kg/pp403 5054 ls$am/pp403 @'etn be%tulang @225 untuk *ile !a* (3458 m3"/pp403 135 m3/pp403 144 @@Pasang bekisting untuk klm m2/pp403 149 @@Pembesian engan 'esi li% .32 kg/pp403 5054 ls$am/pp403 @'etn be%tulang @225 untuk *engisi tiang (848 m3"/pp@@'etn 'e%tulang 1+2+3 .225 (m3" (/A 7394@2008@07">?!;19.3 -*a slum* (12I2" !m !;0.58

    @@*a# dan *e%alatan *embuatan betn k@225 untuk *lat lantai

    @@'etn 'e%tulang 1+2+3 .225 (m3" (/A 7394@2008@07">?!;19.3 -*a slum* (12I2" !m !;0.58

    @@*a# dan *e%alatan *embuatan betn k@225 untuk *lat lantai

    @@'etn 'e%tulang 1+2+3 .225 (m3" (/A 7394@2008@07">?!;19.3 -*a slum* (12I2" !m !;0.58

    @@*a# dan *e%alatan *embuatan betn k@225 untuk *lat lantai

    @@'etn 'e%tulang 1+2+3 .225 (m3" (/A 7394@2008@07">?!;19.3 -*a slum* (12I2" !m !;0.58

    @@*a# dan *e%alatan *embuatan betn k@225 untuk *lat lantai

    @@'etn 'e%tulang 1+2+3 .225 (m3" (/A 7394@2008@07">?!;19.3 -*a slum* (12I2" !m !;0.58

    @@*a# dan *e%alatan *embuatan betn k@225 untuk *lat lantai

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    16/160

    403 135 m3

    403 149 @@Pembesian engan 'esi li% .32 kg

    403 5055 @@*a# dan *e%alatan *embuatan betn isi tiang @225 ls$am

    403 3001 @@=*e%asinal Pntn %ans*%t (:a%i" #a%i

    403 3002 @@=*e%asinal %ael %ane (:a%i" #a%i

    403

    403 135 m3

    403 143 @@Pasang bekisting untuk *lat lantai m2

    403 149 @@Pembesian engan 'esi li% .32 kg

    403 5054 ls$am

    403 5009 @'etn tumbuk @175 untuk t%ti% t;5 !m m3

    403 33 @Pasi% untuk t%ti% m3

    403 5012 @La*isan as*al *asi% m3

    403 5015 @Pi*a

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    17/160

    404 145 @@Pasang bekisting untuk *lat lantai m2

    404 149 @@Pembesian engan 'esi li% .32 kg

    404 5054 ls$am

    404 @'etn be%tulang @225 *engisian tiang (127 m3"

    404 135 m3

    404 149 @@Pembesian engan 'esi li% .32 kg

    404 5055 @@*a# dan *e%alatan *embuatan betn isi tiang @225 ls$am

    404 3001 @@=*e%asinal Pntn %ans*%t (:a%i" #a%i

    404 3002 @@=*e%asinal %ael %ane (:a%i" #a%i

    404 5011 @'etn be%tulang @225 selimut tiang (045 -3" m3

    404 135 m3

    404 143 @@Pasang bekisting untuk *lat lantai m2

    404 149 @@Pembesian engan 'esi li% .32 kg

    404 5054 ls$am

    404 5016 @iang ba$a ;711 mm t;140 mm tn

    404 3006 @Peman!angan tiang *an!ang m?

    404 3010 @Penge!atan tiang *an!ang m2

    404 5017 @Pen)ambungan tiang (setia* 6 m" b#

    404 5018 @Pemtngan tiang b#

    404 5019 @Plat *enutu* tiang b#

    404 5020 @/e*atu tiang b#

    404 3027 @elatasi m?

     JUMLAH

    PPN +, -

     JUMLAH TOTAL

    Harga per- Buah

    Pembangunan De0maga Pen5ebe0angan 7 Dudu#an M49eable B0dge

    405 A -=B'L, 'R?!;19.3 -*a slum* (12I2" !m !;0.58

    @@*a# dan *e%alatan *embuatan betn k@225 untuk *lat lantai

    @@'etn 'e%tulang 1+2+3 .225 (m3" (/A 7394@2008@07">?!;19.3 -*a slum* (12I2" !m !;0.58

    @@*a# dan *e%alatan *embuatan betn k@225 untuk *lat lantai

    @@'etn 'e%tulang 1+2+3 .225 (m3" (/A 7394@2008@07">?!;19.3 -*a slum* (12I2" !m !;0.58

    @@'etn 'e%tulang 1+2+3 .225 (m3" (/A 7394@2008@07">?!;19.3 -*a slum* (12I2" !m !;0.58

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    18/160

    405 149 @@Pembesian engan 'esi li% .32 kg

    405 5054 ls$am

    405 5016 @iang ba$a ;711 mm t;140 mm tn

    405 3006 @Peman!angan tiang *an!ang m?

    405 3010 @Penge!atan tiang *an!ang m2

    405 5017 @Pen)ambungan tiang (setia* 6 m" b#

    405 5018 @Pemtngan tiang b#

    405 5019 @Plat *enutu* tiang b#

    405 5020 @/e*atu tiang *an!ang b#

    405 5022 @Plat ba$a *eng#ubung -' ke dudukan -' kg

    405 5022 @'a$a untuk t%en!# kg

    405 5022 @'%a!ing ba$a *engikat tiang G.200.200.8.12 kg

    405 5023 @ngke% *lat landas !atalk dia.25 mm bua#

    405 5024 @'a$a %en!# kg

    405 5025 @ngku% dudukan engsel -' unit

     JUMLAH

    PPN +, -

     JUMLAH TOTAL

    Harga per- Buah

    Pembangunan De0maga Pen5ebe0angan 7 M440ng D4l6*n

    406 -==RA< =LP:A (3 ':"

    406 @'etn be%tulang @225 untuk *ile !a* (15913 m3"

    406 135 m3

    406 144 @@Pasang bekisting untuk balk m2

    406 149 @@Pembesian engan 'esi li% .32 kg

    406 5054 ls$am

    406 @'etn be%tulang @225 *engisian tiang (1459 m3"

    406 135 m3

    406 149 @@Pembesian engan 'esi li% .32 kg

    406 5055 @@*a# dan *e%alatan *embuatan betn isi tiang @225 ls$am

    406 3001 @@=*e%asinal Pntn %ans*%t (:a%i" #a%i

    406 3002 @@=*e%asinal %ael %ane (:a%i" #a%i

    406 @'etn be%tulang @225 selimut tiang (1338 m3"

    406 135 m3

    406 143 @@Pasang bekisting untuk *lat lantai m2

    406 149 @@Pembesian engan 'esi li% .32 kg

    406 5054 ls$am

    406 5016 @iang ba$a ;812.8 mm t ; 140 mm tn

    406 3003 @Pengangkutan 1 m? tiang *an!ang ketitik *an!ang m?

    406 3006 @Peman!angan tiang *an!ang m?

    406 3010 @Penge!atan tiang *an!ang m2

    406 5017 @Pen)ambungan tiang (setia* 6 m" b#

    406 5018 @Pemtngan tiang b#

    @@*a# dan *e%alatan *embuatan betn k@225 untuk *lat lantai

    @@'etn 'e%tulang 1+2+3 .225 (m3" (/A 7394@2008@07">?!;19.3 -*a slum* (12I2" !m !;0.58

    @@*a# dan *e%alatan *embuatan betn k@225 untuk *lat lantai

    @@'etn 'e%tulang 1+2+3 .225 (m3" (/A 7394@2008@07">?!;19.3 -*a slum* (12I2" !m !;0.58

    @@'etn 'e%tulang 1+2+3 .225 (m3" (/A 7394@2008@07">?!;19.3 -*a slum* (12I2" !m !;0.58

    @@*a# dan *e%alatan *embuatan betn k@225 untuk *lat lantai

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    19/160

    406 5019 @Plat *enutu* tiang b#

    406 5020 @/e*atu tiang b#

    406 5024 @'%an!ing anta% tiang *an!ang G 150.100.7.10(2365 kgm" kg

    406 5026 @'lla%dblde% ka*asitas 70 tn b#

    406 5021 @ngku% dudukan tiang list%ik b#

    406 5023 @ngku% *lat landasan !atalk b#

     JUMLAH

    PPN +, -

     JUMLAH TOTAL

    Harga per- Buah

    Pembangunan De0maga Pen5ebe0angan 7 B0eas!ng D4l6*n

    407 'R,/A< =LP:A (5 ':"

    407 @'etn be%tulang @225 untuk *ile !a* (47905 m3"

    407 135 m3

    407 144 @@Pasang bekisting untuk balk m2

    407 149 @@Pembesian engan 'esi li% .32 kg

    407 5054 ls$am

    407

    407 135 m3

    407 149 @@Pembesian engan 'esi li% .32 kg

    407 5055 @@*a# dan *e%alatan *embuatan betn isi tiang @225 ls$am

    407 3001 @@=*e%asinal Pntn %ans*%t (:a%i" #a%i

    407 3002 @@=*e%asinal %ael %ane (:a%i" #a%i

    407 @'etn be%tulang @225 selimut tiang (4011 m3"

    407 135 m3

    407 143 @@Pasang bekisting untuk *lat lantai m2

    407 149 @@Pembesian engan 'esi li% .32 kg

    407 5054 ls$am

    407 5016 @iang ba$a ;812.8 mm t ; 140 mm tn

    407 3003 @Pengangkutan 1 m? tiang *an!ang ketitik tiang m?

    407 3006 @Peman!angan tiang *an!ang m?

    407 3010 @Penge!atan tiang *an!ang m2

    407 5017 @Pen)ambungan tiang (setia* 6 m" b#

    407 5018 @Pemtngan tiang b#

    407 5019 @Plat *enutu* tiang b#

    407 5020 @/e*atu tiang *an!ang b#

    407 5024 @'%an!ing anta% tiang *an!ang G 150.100.7.10(2365 kgm" kg

    407 5027 @'lla%dblde% ka*asitas 25 tn b#

    407 5023 @ngku% *lat landasan !atalk b#

    407 5021 @ngku% dudukan tiang list%ik b#

    407 5029 @G%ntal >%ame b#

    407 5030 @ n!#% /tainles /tile K 50 mm (>% su**%ting !#aine" set

    @@'etn 'e%tulang 1+2+3 .225 (m3" (/A 7394@2008@07">?!;19.3 -*a slum* (12I2" !m !;0.58

    @@*a# dan *e%alatan *embuatan betn k@225 untuk *lat lantai

    @'etn be%tulang @225 untuk *engisi tiang *an!ang (6034 m3"

    @@'etn 'e%tulang 1+2+3 .225 (m3" (/A 7394@2008@07">?!;19.3 -*a slum* (12I2" !m !;0.58

    @@'etn 'e%tulang 1+2+3 .225 (m3" (/A 7394@2008@07">?!;19.3 -*a slum* (12I2" !m !;0.58

    @@*a# dan *e%alatan *embuatan betn k@225 untuk *lat lantai

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    20/160

    407 ls

    407 5031 set

    407 5032 @Gende% uku%an /-800 L; 1.5 m b#

     JUMLAH

    PPN +, -

     JUMLAH TOTAL

    Harga per- Buah

    Pembangunan De0maga Pen5ebe0angan 7 K4ns!0u#s Dudu#an Hd04l# 

    408 =A/R/ A :R=L (2 ':"

    408 @'etn be%tulang @225 untuk *ile !a* (11454 m3"

    408 135 m3

    408 144 @@Pasang bekisting untuk balk m2

    408 149 @@Pembesian engan 'esi li% .32 kg

    408 5054 ls$am

    408 @'etn be%tulang @225 *engisian tiang (365 m3"

    408 135 m3

    408 149 @@Pembesian engan 'esi li% .32 kg

    408 5055 @@*a# dan *e%alatan *embuatan betn isi tiang @225 ls$am

    408 3001 @@=*e%asinal Pntn %ans*%t (:a%i" #a%i

    408 3002 @@=*e%asinal %ael %ane (:a%i" #a%i

    408 @'etn be%tulang @225 selimut tiang (053 m3"

    408 135 m3

    408 143 @@Pasang bekisting untuk *lat lantai m2

    408 149 @@Pembesian engan 'esi li% .32 kg

    408 5054 ls$am

    408 5016 @iang ba$a ;711 mm t;140 mm tn

    408 3006 @Peman!angan tiang *an!ang m?

    408 3010 @Penge!atan tiang *an!ang m2

    408 5017 @Pen)ambungan tiang (setia* 6 m" b#

    408 5018 @Pemtngan tiang b#

    408 5019 @Plat *enutu* tiang b#

    408 5020 @/e*atu tiang b#

    408 5024 @'%an!ing anta% tiang *an!ang G 150.100.7.10(2365 kgm" kg

    408 5033 @ngku% P%tal ba$a *enggantung #id%lik b#

    408 5023 @ nke% *lat landas !atalk dia.25 mm b#

    408 5022 @*lat ba$a landasan guide %lle% -' b#

     JUMLAH

    PPN +, -

     JUMLAH TOTAL

    Harga per- Buah

    @/u**%ting !#aine K32 mm in!. J /#a!kle K42 mm (/ 25"(:t i* ?!;19.3 -*a slum* (12I2" !m !;0.58

    @@*a# dan *e%alatan *embuatan betn k@225 untuk *lat lantai

    @@'etn 'e%tulang 1+2+3 .225 (m3" (/A 7394@2008@07">?!;19.3 -*a slum* (12I2" !m !;0.58

    @@'etn 'e%tulang 1+2+3 .225 (m3" (/A 7394@2008@07"

    >?!;19.3 -*a slum* (12I2" !m !;0.58

    @@*a# dan *e%alatan *embuatan betn k@225 untuk *lat lantai

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    21/160

    Pembangunan De0maga Pen5ebe0angan 7 K4ns!0u#s Pelndung MB

    409 =A/R/ P,LAA< -' (2 ':"

    409 @'etn be%tulang @225 untuk *ile !a* (1736 m3"

    409 135 m3

    409 144 @@Pasang bekisting untuk balk m2

    409 149 @@Pembesian engan 'esi li% .32 kg

    409 5054 ls$am

    409 @'etn be%tulang @225 *engisian tiang (484 m3"

    409 135 m3

    409 149 @@Pembesian engan 'esi li% .32 kg

    409 5055 @@*a# dan *e%alatan *embuatan betn isi tiang @225 ls$am

    409 3001 @@=*e%asinal Pntn %ans*%t (:a%i" #a%i

    409 3002 @@=*e%asinal %ael %ane (:a%i" #a%i

    409 @'etn be%tulang @225 selimut tiang (215 m3"

    409 135 m3

    409 143 @@Pasang bekisting untuk *lat lantai m2

    409 149 @@Pembesian engan 'esi li% .32 kg

    409 5054 ls$am

    409 5016 @iang ba$a ;812.8 mm t ; 140 mm tn

    409 3003 @Pengangkutan 1 m? tiang *an!ang ketitik *an!ang m?

    409 3006 @Peman!angan tiang *an!ang m?

    409 3010 @Penge!atan tiang *an!ang m2

    409 5017 @Pen)ambungan tiang (setia* 6 m" b#

    409 5018 @Pemtngan tiang b#

    409 5019 @Plat *enutu* tiang b#

    409 5020 @/e*atu tiang *an!ang b#

    409 5023 @'%an!ing anta% tiang *an!ang G 150.100.7.10(2365 kgm" kg

    409 5035 @G%ntal >%ame b#

    409 5034 @Gende% uku%an ,LL 400 b#

    409 5035 @Pemasangan >%ntal >%ame ls

     JUMLAH

    PPN +, -

     JUMLAH TOTAL

    Harga per- Buah

    Pembangunan De0maga Pen5ebe0angan 7 8a!?!;19.3 -*a slum* (12I2" !m !;0.58

    @@*a# dan *e%alatan *embuatan betn k@225 untuk *lat lantai

    @@'etn 'e%tulang 1+2+3 .225 (m3" (/A 7394@2008@07">?!;19.3 -*a slum* (12I2" !m !;0.58

    @@'etn 'e%tulang 1+2+3 .225 (m3" (/A 7394@2008@07">?!;19.3 -*a slum* (12I2" !m !;0.58

    @@*a# dan *e%alatan *embuatan betn k@225 untuk *lat lantai

    @@'etn 'e%tulang 1+2+3 .225 (m3" (/A 7394@2008@07">?!;19.3 -*a slum* (12I2" !m !;0.58

    @@*a# dan *e%alatan *embuatan betn k@225 untuk *lat lantai

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    22/160

    410 @'etn be%tulang @225 *engisian tiang (176 m3"

    410 135 m3

    410 149 @@Pembesian engan 'esi li% .32 kg

    410 5055 @@*a# dan *e%alatan *embuatan betn isi tiang @225 ls$am

    410 3001 @@=*e%asinal Pntn %ans*%t (:a%i" #a%i

    410 3002 @@=*e%asinal %ael %ane (:a%i" #a%i

    410 @'etn be%tulang @225 selimut tiang (164 m3"

    410 135 m3

    410 143 @@Pasang bekisting untuk *lat lantai m2

    410 149 @@Pembesian engan 'esi li% .32 kg

    410 5054 ls$am

    410 @'etn be%tulang *elat lantai (852 m3"

    410 135 m3

    410 145 @@Pasang bekisting untuk *lat lantai m2

    410 149 @@Pembesian engan 'esi li% .32 kg

    410 5054 ls$am

    410 5016 @iang ba$a ;711.2 mm t ; 140 mm tn

    410 3003 @Pengangkutan 1 m? tiang *an!ang ke titik tiang m

    410 3006 @Peman!angan tiang *an!ang m?

    410 3010 @Penge!atan tiang *an!ang m2

    410 5017 @Pen)ambungan tiang (setia* 6 m" b#

    410 5018 @Pemtngan tiang b#

    410 5019 @Plat *enutu* tiang b#

    410 5020 @/e*atu tiang *an!ang b#

    410 5024 @P%Ml ba$a G 100.50.5.7 kg

    410 5024 @P%Ml ba$a G 200.100.8.12 kg

    410 5024 @P%Ml ba$a G 450.250.9.12 kg

    410 5022 @Plat ba$a t;12 mm kg

    410 5022 @Plat ba$a t;8 mm kg

    410 5036 @'nde m2

    410 5006 @'etn be%tulang @225 *lat di atas bnde m3

    410 5015 @Pi*a %ailling dia. 25H tebal 3 mm m2

     JUMLAH

    PPN +, -

     JUMLAH TOTAL

    Harga per- M2

    Pembangunan De0maga Pen5ebe0angan 7 K4ns!0u#s Dudu#an dan Ruang K4n!04l

    411 =A/R/ A & RA< =AR=L (1 ':"

    411 @'etn be%tulang @225 untuk *lat lantai (361 m3"

    411 135 m3

    411 145 @@Pasang bekisting untuk *lat lantai m2

    411 149 @@Pembesian engan 'esi li% .32 kg

    @@'etn 'e%tulang 1+2+3 .225 (m3" (/A 7394@2008@07">?!;19.3 -*a slum* (12I2" !m !;0.58

    @@'etn 'e%tulang 1+2+3 .225 (m3" (/A 7394@2008@07">?!;19.3 -*a slum* (12I2" !m !;0.58

    @@*a# dan *e%alatan *embuatan betn k@225 untuk *lat lantai

    @@'etn 'e%tulang 1+2+3 .225 (m3" (/A 7394@2008@07">?!;19.3 -*a slum* (12I2" !m !;0.58

    @@*a# dan *e%alatan *embuatan betn k@225 untuk *lat lantai

    @@'etn 'e%tulang 1+2+3 .225 (m3" (/A 7394@2008@07">?!;19.3 -*a slum* (12I2" !m !;0.58

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    23/160

    411 5054 ls$am

    411 @'etn be%tulang @225 untuk balk (209 m3"

    411 135 m3

    411 144 @@Pasang bekisting untuk balk m2

    411 149 @@Pembesian engan 'esi li% .32 kg

    411 5054 ls$am

    411 @'etn be%tulang @225 *ile !a* (338 m3"

    411 135 m3

    411 144 @@Pasang bekisting untuk klm m2

    411 149 @@Pembesian engan 'esi li% .32 kg

    411 5054 ls$am

    411 @'etn be%tulang @225 *engisi tiang (15 m3"

    411 135 m3

    411 149 @@Pembesian engan 'esi li% .32 kg

    411 5055 @@*a# dan *e%alatan *embuatan betn isi tiang @225 ls$am

    411 3001 @@=*e%asinal Pntn %ans*%t (:a%i" #a%i

    411 3002 @@=*e%asinal %ael %ane (:a%i" #a%i

    411 @'etn be%tulang @225 selimut tiang (08 m3"

    411 135 m3

    411 143 @@Pasang bekisting untuk *lat lantai m2

    411 149 @@Pembesian engan 'esi li% .32 kg

    411 5054 ls$am

    411 5016 @iang ba$a ;711 mm t;140 mm tn

    411 3006 @Peman!angan tiang *an!ang m?

    411 3010 @Penge!atan tiang *an!ang m2

    411 5017 @Pen)ambungan tiang b#

    411 5018 @Pemtngan tiang b#

    411 5020 @/e*atu tiang b#

    411 5019 @Plat *enutu* tiang b#

    411 5022 @'a$a untuk t%en!# kg

     JUMLAH

    PPN +, -

     JUMLAH TOTAL

    Harga per- Buah

    Pembangunan De0maga Pen5ebe0angan 7 Ruma* K4n!04l

    412 R-: =AR=L 1444 m2

    412 @'etn @225

    412 164 @@'etn be%tulang sl* m3

    412 173 @@'etn be%tulang klm m3

    412 181 @@'etn be%tulang %ing balk m3

    412 @Peke%$aan dinding

    412 @Pasangan bata di*leste% dan a!ian

    @@*a# dan *e%alatan *embuatan betn k@225 untuk *lat lantai

    @@'etn 'e%tulang 1+2+3 .225 (m3" (/A 7394@2008@07">?!;19.3 -*a slum* (12I2" !m !;0.58

    @@*a# dan *e%alatan *embuatan betn k@225 untuk *lat lantai

    @@'etn 'e%tulang 1+2+3 .225 (m3" (/A 7394@2008@07">?!;19.3 -*a slum* (12I2" !m !;0.58

    @@*a# dan *e%alatan *embuatan betn k@225 untuk *lat lantai

    @@'etn 'e%tulang 1+2+3 .225 (m3" (/A 7394@2008@07">?!;19.3 -*a slum* (12I2" !m !;0.58

    @@'etn 'e%tulang 1+2+3 .225 (m3" (/A 7394@2008@07">?!;19.3 -*a slum* (12I2" !m !;0.58

    @@*a# dan *e%alatan *embuatan betn k@225 untuk *lat lantai

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    24/160

    412 61 @@Pasangan 'ata m2

    412 89 @@Pleste%an m2

    412 126 @@!ian m2

    412 61 @Pasangan bata e*sed m2

    412 61 @'ata ke%aang m2

    412 @Peke%$aan ata*

    412 269 @@nst%uksi ata* ka)u kls. m3

    412 347 @@Lis*lank 3020 m2

    412 432 @@Penutu* ata* Cin!alume t; 0.40 mm m2

    412 433 @@'ubungan Cin!alume m?

    412 @Peke%$aan kusen

    412 225 @@usen *intu unit

    412 225 @@usen $endela unit

    412 233 @@aun *intu *anil ka)u kam*e% unit

    412 238 @@aun $endela *anil ka)u b%ne unit

    412 249 @@aun $endela ka!a mati 5 mm unit

    412 @Peke%$aan *enggantung ls

     JUMLAH

    PPN +, -

     JUMLAH TOTAL

    Harga per- M2

    Pembangunan De0maga Pen5ebe0angan 7 Pembua!an Jalan dan La6angan Pene!0as Dengan K4la#an "L?1$+

    413

    413 5012 @La*. Penet%asi as*#alt betn t;7 !m m2

    413 5005 @La*. 'ase !u%se da%i batu *e!a# 35 !m t;10 !m m3

    413 5005 @La*. 'ase !u%se da%i batu *e!a# 57 !m t;30 !m m3

    413 5003 @Pemadatan la*angan subg%ade m2

    413 5037 @La*. P%ime !at 6070 25 kgm2 m2

     JUMLAH

    PPN +, -

     JUMLAH TOTAL

    Harga per- M2

    Pembangunan De0maga Pen5ebe0angan 7 Pembangunan M49eable B0dge

    414 P,-'Ating beam" : 8565502040 (I 5000 kgunit"

    @@

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    25/160

    414 216 kg

    414 216 @@udukan engsel -able '%idge (I 1000 kgunit" kg

    414 216 kg

    414 216 kg

    414 216 kg

    414 216 @@/a!kle dia. 145 mm dan s#a>t@n)a km*lit (I 320 kgunit" kg

    414 216 kg

    414 216 kg

    414 216 kg

    414 216 kg

    414 216 kg

    414 ls

    414 5038 @,ngsel mable b%idge unit

    414 5039 @%ans*%t mate%ial ba$a da%i %ks#* ke site tn

    414 5040 @P%tal *enggantung #id%lik b#414 5041 @,%e!tin tn

    414 5042 @a!kle ele!t%i! ka*asitas 35 tnunit unit

    414 5043 @ting b%a!ket te%masuk s#a>t@n)a (I 550

    @@:k *enggantung -' t; 70 mm te%masuk s#a>t dan a!!ess%ies (I 450 kgunit

    @@Jint *late *eng#ubung li>ting beam dengan #k *enggantung *elat ; 40 mm te%ma

    @@Jint *late *eng#ubung li>ting beam dengan #id%aulik silinde% *elat t; 50 mm te%masu

    @@/#a>t engsel -' dia. 220 mm *an$ang I 320 mm dila*isi #a%d!%m mate%ial /45 dile

    @@Peke%$aan *emasangan st%uktu% ba$a -' (tal I 120000g"

    @Pi*a #)d%aulik )*e Ban Pum* *e%atin *%essu%e ma 140 kg!m2

    @Pemasangan #)d%aulik !)linde% instalasi *embe%si#an *i*a dan li untuk *e%asinal t

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    26/160

    PPN +, -

     JUMLAH TOTAL

    Harga per- Paket 

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    27/160

    Bl :a%ga /atuan Jumla#

    1 979983.11 979983.11

    0.56 107358.21 60388.99

    1 8161.62 8161.62

    14.31 1926.84 27573.14

    1 47024.52 47024.52

    0.11 1061617.55 116777.93

    0.25 80814.96 20203.74

    0.04 334607.37 13384.29

    1.12 57120.81 63975.31

    1 15134.14 15134.14

    +=:1=@,@$2,

    +:=1@,$@2

    +=32%=2@%$32

    1,487,868.00

    1 1488548.30 1488548.30

    0.81 107358.21 86960.15

    1 8161.62 8161.62

    14.31 1926.84 27573.14

    1 47024.52 47024.52

    0.11 1061617.55 116777.930.25 80814.96 20203.74

    0.04 334607.37 13384.29

    1.12 57120.81 63975.31

    1 15134.14 15134.14

    +=22%=%3:$+3

    +22=%%3$:+

    1=,%@=+%$3@

    2,076,518.00

    1 6930255.93 6930255.93

    0.56 63710.93 35678.12

    0.43 1061617.55 458618.78

    36 11852.18 426678.640.05 334607.37 18068.80

    293.4 9416.00 2762654.40

    0.5 2943784.00 1471892.00

    3.6 57120.81 205634.92

    1 15134.14 15134.14

    +1=:13=@+$%3

    +=1:1=3@+$%

    +:=%=,%%$:+

    13,557,078.00

    1 7608761.35 7608761.35

    0.56 63710.93 35678.12

    0.43 1061617.55 456495.55

    36 11852.18 426678.64

    0.05 334607.37 18068.80

    2.88 57120.81 164507.93

    293.4 9416.00 2762654.40

    0.5 2943784.00 1471892.00

    1 15134.14 15134.14

    +1=..=2%,$.3

    +=1.=.2%$,.

    +3=1=22$,:

    14,255,859.00

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    28/160

    1 79584467.97 79584467.97

    1.12 63710.93 71356.24

    1.28 1061617.55 1358870.46

    0.24 1061617.55 254788.21

    141.6 11852.18 1678269.33

    0.19 334607.37 63575.40

    12.8 57120.81 731146.38

    3602.78 9416.00 33923776.48

    1 2943784.00 2943784.00

    +1,=@+,=,:3$32

    +1=,@+=,,:$3

    +:1=@%+=,:%$.:

    132,671,038.00

    1 5045183.75 5045183.75

    3.92 80814.96 316794.64

    0.46 334607.37 153919.39

    13.63 57120.81 778556.65

    1.19 1061617.55 1263324.89

    1 1323073.77 1323073.772=22,=2:$,.

    222=,2$:+

    .=%@2=.:2$3,

    9,768,939.00

      alam Tana*

    1 6108672.55 6108672.55

    3.92 80814.96 316794.64

    0.46 334607.37 153919.39

    13.63 57120.81 778556.65

    1.19 1061617.55 1263324.89

    1 1323073.77 1323073.77

    1 8161.62 8161.62

    1 1235661.05 1235661.05

    ++=+22=+@3$@

    +=++2=2+@$3@

    +1=:,@=.2+$,+

    12,306,982.00

    1 3851063.75 3851063.75

    1.68 80814.96 135769.13

    0.2 334607.37 66921.47

    5.84 57120.81 333585.53

    0.51 1061617.55 541424.951 1323073.77 1323073.77

    @=1+=2:2$@+

    @1=+2:$2@

    @=2%%=,11$3%

    6,877,023.00

    1 23590.83 23590.83

    1 8283.53 8283.53

    :+=2%3$:@

    :=+2%$33

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    29/160

    :=,@+$%.

    35,062.00

    1 26215.00 26215.00

    1 8283.53 8283.53

    :3=3.2$:

    :=33.$2

    :%=.32$:.

    37,949.00

    1 225266.20 225266.20

    1 32325.98 32325.98

    1 2648.48 2648.48

    1@,=13,$@@

    1@=,13$,%

    12@=1@3$%:

    286,265.00

    1 232970.20 232970.20

    1 32325.98 32325.98

    1 2648.48 2648.48

    1@%=.33$@@

    1@=%.3$3%

    1.3=%:.$+:

    294,740.00

    1 230180.20 230180.20

    1 45256.38 45256.38

    1 2648.48 2648.48

    1%2=,2$,

    1%=2,2$+

    :,=2.:$@

    305,894.00

    1 507608.20 507608.20

    1 32325.98 32325.98

    1 2648.48 2648.48

    31=21$@@

    3=12$1%

    .@=23,$.:

    596,841.00

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    30/160

    1 35526407.00 35526407.00

    460 4264.66 1961744.81

    160 3174.84 507974.54

    2.5 202093.52 505233.80

    100 66349.08 6634908.22

    1.87 1061617.55 1985649.47

    0.31 1061617.55 324854.97

    1 563700.67 563700.67

    0.38 1061617.55 403414.67

    15 36915.00 553725.00

    1 2200000.00 2200000.00

    1 1235661.05 1235661.05

    1=3,:=1%3$+2

    =13,=:1%$31

    %=@3:=@,+$@,

    57,643,602.00

    1 26686000.00 26686000.00

    2.4 63710.93 152906.23

    0.6 1061617.55 636970.53

    1 5500000.00 5500000.00

    :1=.%=2%@$%@

    :=1.%=2%$@2

    :@=1%:=3@3$33

    36,273,465.00

    1 32936000.00 32936000.00

    2.4 63710.93 152906.23

    0.6 1061617.55 636970.53

    1 5500000.00 5500000.00

    :.=11=2%@$%@

    :=.11=2%$@2

    3:=+32=3@3$33

     43,148,465.00

    1 127711433.25 127711433.25

    460 4264.66 1961744.81

    160 3174.84 507974.54

    100 202093.52 20209351.92

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    31/160

    100 66349.08 6634908.22

    1.4 1061617.55 1489237.10

    0.82 1061617.55 874560.54

    2.24 1061617.55 2382269.78

    1 1200000.00 1200000.00

    1 563700.67 563700.67

    1 36915.00 36915.00

    100 8283.53 828353.34

    1 2200000.00 2200000.00

    1 2000000.00 2000000.00

    +@2=@,,=33.$+@

    +@=2@,=,33$.1

    +2=3@,=3.3$,%

    185,460,495.00

    1 151169507.50 151169507.50

    560 4264.66 2388211.07

    200 3174.84 634968.17

    100 202093.52 20209351.92

    120 66349.08 7961889.86

    1.87 1061617.55 1985649.47

    1.1 1061617.55 1166080.72

    2.75 1061617.55 2923694.73

    1 1250000.00 1250000.00

    1 563700.67 563700.67

    1 36915.00 36915.00

    100 8283.53 828353.34

    1 2200000.00 2200000.00

    1 2000000.00 2000000.00

    +.=:+2=:11$33

    +.=:+=2:1$13

    1+3=2,=+3$@.

    214,850,155.00

    1 555961.78 555961.78

    0.1 1061617.55 106161.76

    0.18 80814.96 14546.69

    0.04 334607.37 13384.29

    0.8 57120.81 45696.65

    1 15134.14 15134.14

    %,=22$:1

    %=,22$:

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    32/160

    21=.%:$2

    825,974.00

    1 400961.78 400961.78

    0.1 1061617.55 106161.76

    0.18 80814.96 14546.69

    0.04 334607.37 13384.29

    0.8 57120.81 45696.65

    1 15134.14 15134.14

    .=22$:1

    .=22$:

    @=3%:$2

    655,474.00

    1 4493544.83 4493544.83

    1 8161.62 8161.62

    4 1926.84 7707.38

    1 47024.52 47024.52

    0.24 1061617.55 254788.21

    0.3 80814.96 24244.49

    0.03 334607.37 10038.22

    1.15 57120.81 65688.93

    1 15134.14 15134.14

    3=.1@=::1$:3

    3.1=@::$1:

    =3+2=.@$2

    5,418,966.00

    1 373900920.00 373900920.00

    8 80814.96 646519.68

    0.6 1061617.55 636970.53

    0.9 1061617.55 955455.80

    1.44 1061617.55 1528729.27

    4.4 36915.00 162426.00

    6 36915.00 221490.00

    7.2 36915.00 265788.00

    50 8283.53 414176.67

    :%2=%:1=3%$.

    :%=2%:=13%$.

    3+@=@,=%1:$3

     416,605,724.00

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    33/160

    1 353263190.00 353263190.00

    8 80814.96 646519.68

    0.6 1061617.55 636970.53

    0.9 1061617.55 955455.80

    1.44 1061617.55 1528729.27

    4.4 36915.00 162426.00

    6 36915.00 221490.00

    7.2 36915.00 265788.00

    50 8283.53 414176.67

    :2=,.3=%3$.

    :=2,.=3%3$.

    :.:=.,3=11,$3

    393,904,221.00

    1 12450000.00 12450000.00

    0.27 1061617.55 291520.18

    1 51115.46 51115.46

    1 52969.50 52969.50

    1 2200000.00 2200000.00

    +=,3=@,$+3

    +=,3=@,$+

    +@=,=+@$@

    16,550,166.00

    1 34436000.00 34436000.00

    0.27 1061617.55 291520.18

    1 32100.00 32100.00

    1 37450.00 37450.00

    1 37450.00 37450.00

    1 52969.50 52969.50

    :3=22%=32.$@2

    :=322=%32$.%

    :2=:%@=1:2$@3

    38,376,239.00

    1 4981724.75 4981724.75

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    34/160

    3.92 80814.96 316794.64

    0.46 334607.37 153919.39

    13.63 57120.81 778556.65

    1.19 1061617.55 1263324.89

    1 1323073.77 1323073.77

    1 8161.62 8161.62

    1 1235661.05 1235661.05

    +,=,@+=1+@$%@

    +=,,@=+1+$@2

    ++=,@%=::2$3:

    11,067,339.00

    180 698277.72 125689989.60

    180 3530938.26 635568887.48

    1 1000000.00 1000000.00

    1 1500000.00 1500000.00

    1 440000000.00 440000000.00

    1 25200000.00 25200000.00

    1 479500.36 479500.36

    0 36363640000.00 100000008.00

    0 36363640000.00 36363644.00

    1 35000000.00 35000000.00

    +=3,,=2,1=,1.$33

    +3,=,2,=1,1$.3

    +=3,=221=1:1$:2

    1,540,882,233.00

    119.81 329156.65 39436258.60

    303.9 208541.90 63375883.16

    104.14 466352.27 48565925.73

    280.69 466352.27 130900419.57

    289.5 158654.91 45930597.43

    10.5 402002.01 4221021.13

    31.5 402002.01 12663063.38

    31.5 5833246.90 183747277.35

    1.48 6182672.30 9129105.16

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    35/160

    0.49 6182672.30 3027221.84

    5.36 1400247.89 7506028.84

    1.44 1400247.89 2016356.97

    10.87 208541.90 2267267.53

    1.26 208541.90 262762.79

    61.8 305485.00 18878973.00

    79.5 202174.85 16072900.89

    11 366385.03 4030235.38

    .1=,:+=1.2$%

    .=1,:=+1.$2%

    @+=1:3=312$@1

    5,990,015.00

    126.65 901123.86 114127336.49

    506.6 553759.41 280534518.80

    25330.00 12141.12 307534447.05

    126.65 667060.15 84483167.87

    56.21 901123.86 50652172.00

    697 476986.91 332461786.55

    12366.20 12141.12 150139458.32

    56.21 667060.15 37495450.98

    1.62 901123.86 1459820.65

    20.09 476986.91 9581713.12

    356.4 12141.12 4327093.44

    1.62 667060.15 1080637.44

    4.2 901123.86 3784720.20

    52.08 476986.91 24841478.45

    924 12141.12 11218390.41

    4.2 667060.15 2801652.63

    34.58 901123.86 31160862.97

    138.32 476986.91 65976829.85

    39.77 12141.12 482815.73

    34.58 667060.15 23066939.95

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    36/160

    8.48 901123.86 7641530.31

    1769.27 12141.12 21480874.40

    8.48 518854.32 4399884.59

    0.21 5115687.55 1084525.76

    0.21 8747667.15 1854505.44

    3.01 901123.86 2712382.81

    33.11 455319.41 15075625.78

    602 12141.12 7308951.33

    3.01 667060.15 2007851.05

    4.55 1400247.89 6371127.92

    9.09 334607.37 3041581.01

    403 202174.85 81476466.15

    240 305485.00 73316400.00

    106.04 15000000.00 1590600000.00

    388 596561.75 231465957.98

    535.81 175328.21 93942608.67

    40 605040.02 24201600.80

    20 565289.63 11305792.70

    20 806115.93 16122318.57

    20 1894517.55 37890351.01

    7 366385.03 2564695.24

    154.87 155573.65 24093690.90

    7.2 143430.88 1032702.31

    4 333394.88 1333579.52

    :=%..=:@=1.%$++

    :%.=.:=@1.$%+

    3=+%.=32.=.1@$21

    9,669,150.00

    19.95 901123.86 17977420.95

    79.8 476986.91 38063555.68

    4588.50 12141.12 55709506.92

    19.95 667060.15 13307849.97

    7.42 5833246.90 43282692.00

    7.42 901123.86 6686339.02

    29.68 553759.41 16435579.39

    1484.00 12141.12 18017414.90

    7.42 667060.15 4949586.31

    1.36 5833246.90 7933215.78

    1.36 901123.86 1225528.45

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    37/160

    5.44 553759.41 3012451.21

    272 12141.12 3302383.32

    1.36 667060.15 907201.80

    1.27 901123.86 1144427.30

    264.97 12141.12 3217065.28

    1.27 518854.32 658944.98

    0.21 5115687.55 1084525.76

    0.21 8747667.15 1854505.44

    0.45 8939367.23 4022715.25

    0.45 901123.86 405505.74

    4.95 455319.41 2253831.10

    90 12141.12 1092700.36

    0.45 667060.15 300177.07

    13.01 15000000.00 195150000.00

    36 596561.75 21476222.91

    80.37 175328.21 14091128.31

    6 605040.02 3630240.12

    3 565289.63 1695868.90

    3 806115.93 2418347.79

    3 1894517.55 5683552.65

    65.52 366385.03 24005547.45

    +3=..@=,:1$+,

    +=3..=@,:$1+

    @@=3.=@:$:+

    566,495,636.00

    83.5 901123.86 75243842.06

    334 476986.91 159313629.06

    19205.00 12141.12 233170116.69

    83.5 667060.15 55699522.44

    2.43 901123.86 2189730.97

    507 12141.12 6155487.11

    2.43 518854.32 1260815.99

    0.06 5115687.55 310778.02

    0.06 8747667.15 531420.78

    3.78 8939367.23 33790808.12

    3.78 901123.86 3406248.18

    41.58 455319.41 18932181.21

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    38/160

    756 12141.12 9178683.06

    3.78 667060.15 2521487.36

    86.76 15000000.00 1301400000.00

    360 596561.75 214762229.05

    267.9 175328.21 46970427.69

    20 605040.02 12100800.40

    10 565289.63 5652896.35

    10 806115.93 8061159.29

    10 1894517.55 18945175.51

    710 13733.45 9750749.50

    1356.00 13733.45 18622558.20

    1147.70 13733.45 15761880.57

    16 278200.00 4451200.00

    2332.80 13733.45 32037392.16

    2 2852834.00 5705668.00

    1=1.=.1@=22%$%

    11.=.1=@22$%%

    1=1=+.=%@$1

    2,525,519,577.00

    159.13 901123.86 143395839.36

    636.52 476986.91 303611710.08

    36599.90 12141.12 444363600.82

    159.13 667060.15 106149281.51

    14.59 901123.86 13147397.07

    3044.06 12141.12 36958258.74

    14.59 518854.32 7570084.46

    0.36 5115687.55 1865947.03

    0.36 8747667.15 3190711.59

    13.38 901123.86 12057037.21

    147.18 455319.41 67013911.26

    2676.00 12141.12 32489624.17

    13.38 667060.15 8925264.79

    52.95 15000000.00 794250000.00

    1044.76 110906.84 115870694.93

    576 596561.75 343619566.48

    505.59 175328.21 88644190.13

    36 605040.02 21781440.72

    18 565289.63 10175213.43

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    39/160

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    40/160

    45 2000000.00 90000000.00

    15 503782.00 7556730.02

    10 36915000.00 369150000.00

    +:=.@%=3+=3.+$@+

    +=:.@=%3=+3.$+@

    +=:@3=+.@=@3,$%%

    3,072,839,329.00

    114.54 901123.86 103214726.58

    458.16 476986.91 218536324.22

    26344.20 12141.12 319847966.05

    114.54 667060.15 76405069.47

    3.65 901123.86 3289102.08

    761.54 12141.12 9245896.28

    3.65 518854.32 1893818.25

    0.08 5115687.55 429717.75

    0.08 8747667.15 734804.04

    0.53 901123.86 477595.64

    5.83 455319.41 2654512.18

    106 12141.12 1286958.21

    0.53 667060.15 353541.88

    69.41 15000000.00 1041150000.00

    288 596561.75 171809783.24

    1071.62 175328.21 187885217.33

    16 605040.02 9680640.32

    8 565289.63 4522317.08

    8 806115.93 6448927.43

    8 1894517.55 15156140.40

    558.88 13733.45 7675350.54

    4 18372777.40 73491109.60

    48 278200.00 13353600.00

    844.03 13733.45 11591443.80

    1=12+=+:3=@1$:@

    112=++:=3@$13

    1=,.=132=,+2$@,

    1,254,624,010.00

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    41/160

    17.36 901123.86 15643510.16

    69.44 476986.91 33121971.26

    3992.80 12141.12 48477044.62

    17.36 667060.15 11580164.19

    4.84 901123.86 4361439.47

    1009.82 12141.12 12260316.63

    4.84 518854.32 2511254.89

    0.12 5115687.55 618998.19

    0.12 8747667.15 1058467.73

    2.15 901123.86 1937416.29

    23.65 455319.41 10768304.13

    430 12141.12 5220679.52

    2.15 667060.15 1434179.32

    23.7 15000000.00 355500000.00

    356.74 110906.84 39564483.80

    180 596561.75 107381114.53

    1530.58 175328.21 268353852.99

    40 605040.02 24201600.80

    5 565289.63 2826448.17

    5 806115.93 4030579.64

    5 1894517.55 9472587.75

    300 278200.00 83460000.00

    1 162332435.99 162332435.99

    3 30326433.27 90979299.81

    1 162332435.99 162332435.99

    +=3.=312=2$2@

    +3=.31=22$.

    +=@,=:%+=333$3

    802,685,723.00

    6.48 901123.86 5839282.59

    25.92 476986.91 12363500.79

    1490.40 12141.12 18095118.04

    6.48 667060.15 4322549.77

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    42/160

    1.76 901123.86 1585977.99

    367.21 12141.12 4458295.19

    176 518854.32 91318359.48

    0.04 5115687.55 225090.25

    0.04 8747667.15 384897.35

    1.64 901123.86 1477843.13

    18.04 455319.41 8213962.22

    328 12141.12 3982285.77

    1.64 667060.15 1093978.64

    8.52 901123.86 7677575.26

    34.08 553759.41 18872120.81

    1704.00 12141.12 20688460.24

    8.52 667060.15 5683352.47

    11.57 15000000.00 173520000.00

    0.13 110906.84 14733.47

    76.8 596561.75 45815942.20

    42.9 175328.21 7521580.25

    12 605040.02 7260480.24

    6 565289.63 3391737.81

    6 806115.93 4836695.57

    6 1894517.55 11367105.30

    2128.00 13733.45 29224781.60

    299.5 13733.45 4113168.28

    102.6 13733.45 1409051.97

    100 13733.45 1373345.00

    20 13733.45 274669.00

    16.8 493270.00 8286936.00

    2 5833246.90 11666493.80

    28 305485.00 8553580.00

    13=.+1=.,$32

    1=3.+=1.$,

    %%=3,3=13$:

    32,078,014.00

    3.61 901123.86 3253057.12

    14.44 553759.41 7996285.93

    722 12141.12 8765885.15

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    43/160

    3.61 667060.15 2408087.14

    2.09 901123.86 1883348.86

    25.92 476986.91 12361592.85

    459.8 12141.12 5582484.75

    2.09 667060.15 1394155.71

    3.38 901123.86 3045798.64

    13.52 476986.91 6448863.07

    777.4 12141.12 9438502.93

    3.38 667060.15 2254663.30

    1.5 901123.86 1351685.79

    312.96 12141.12 3799683.40

    1.5 518854.32 778281.47

    0.04 5115687.55 191838.28

    0.04 8747667.15 328037.52

    0.8 901123.86 720899.09

    8.8 455319.41 4006810.84

    160 12141.12 1942578.43

    8 667060.15 5336481.19

    6.27 15000000.00 94050000.00

    26 596561.75 15510605.43

    26 175328.21 4558533.48

    26.79 605040.02 16209022.13

    1 565289.63 565289.63

    1 1894517.55 1894517.55

    1 806115.93 806115.93

    990 13733.45 13596115.50

    1:,=3%.=11+$+,

    1:=,3%=.11$++

    1:=1%=+3:$11

    253,527,144.00

    0.41 3886731.01 1612896.20

    0.62 4640859.97 2863874.69

    0.54 4009596.39 2164279.89

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    44/160

    4.25 231973.10 985885.68

    4.25 59740.42 253896.79

    4.25 32191.10 136812.17

    12.33 231973.10 2860460.30

    1 231973.10 231973.10

    2 9881745.96 19763491.92

    4.72 59070.82 278814.28

    55.18 71237.48 3930599.19

    18.48 40856.27 755023.83

    1 11161586.18 11161586.18

    5 11161586.18 55807930.88

    1 693249.20 693249.20

    4 418608.48 1674433.93

    1 715504.62 715504.62

    1 5000000.00 5000000.00

    ++,=2.,=%+1$2

    ++=,2.=,%+$12

    +1+=.%.=%23$+:

    8,447,354.00

    M1= TEBAL ? % 8M)

    2149.40 202174.85 434554631.14

    214.9 402002.01 86390232.37

    644.8 402002.01 259210897.30

    2149.40 208541.90 448239958.11

    2149.40 36949.74 79419770.03

    +=:,%=2+=322$.3

    +:,=%2+=32$2.

    +=3:2=.%=,:%$2:

    669,114,902.00

    12000.00 25579.28 306951319.44

    17000.00 25579.28 434847702.54

    23400.00 25579.28 598555072.91

    2000.00 25579.28 51158553.24

    3500.00 25579.28 89527468.17

    15600.00 25579.28 399036715.27

    5000.00 25579.28 127896383.10

    24000.00 25579.28 613902638.88

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    45/160

    5700.00 25579.28 145801876.73

    2000.00 25579.28 51158553.24

    460 25579.28 11766467.25

    600 25579.28 15347565.97

    720 25579.28 18417079.17

    1280.00 25579.28 32741474.07

    1100.00 25579.28 28137204.28

    900 25579.28 23021348.96

    1600.00 25579.28 40926842.59

    1500.00 25579.28 38368914.93

    200 25579.28 5115855.32

    1 120000000.00 120000000.00

    2 32100000.00 64200000.00

    85 1889085.00 160572225.00

    2 184771131.00 369542262.0085 2140000.00 181900000.00

    2 400655936.00 801311872.00

    1 272850000.00 272850000.00

    4 4900172.00 19600688.00

    =,11=@@=,2:$,%

    ,1=1@=@,2$:+

    =13=.1+=@.+$:%

    29,767,898.00

    2 2300500000.00 4601000000.00

    1 930900000.00 930900000.00

    1 55739510.00 55739510.00

    1 455584921.00 455584921.00

    1 22898000.00 22898000.00

    1 125939000.00 125939000.00

    @=+.1=,@+=3:+$,,

    @+.=1,@=+3:$+,

    @=2++=1@%=%3$+,

    6,811,267,575.00

    300 36059.00 10817700.00

    7 40071500.00 280500500.00

    1 34347000.00 34347000.00

    :1=@@=1,,$,,

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    46/160

    :1=@@=1,$,,

    :2=1:+=%1,$,,

    358,231,720.00

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    47/160

    AnlsID Nama Analsa Ha0ga Sa!uan Pe#e0/aan

    ANALISA HARGA SATUAN PEKERJAAN FASILITAS KESELAMATAN JALAN

    8001

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    48/160

    5004 %ugan dan Pemadatan /i%tu (untuk subbase" (m3"

    5005 %ugan dan Pemadatan 'atu Pe!a# ('ase u%se"

    5006 'etn 'e%tulang @225 untuk Pelat /t%ess (m3"

    5007 'etn 'e%tulang @225 untuk 'alk dan Pile a* %estle

    5008 'etn 'e%tulang @225 'alk iang Railing ansteen

    5009 'etn @175 tan*a ulangan

    5010 'etn si iang Pan!ang

    5011 'etn /elimut iang

    5012 s*al Penet%asi t;75 !m *adat

    5013 'ekisting (m2"

    5014 %ugan Pasi% dan Pemadatan (sub g%ade" (m3"

    5015 Pengadaan *i*a %ailing 25H (m?"

    5016 Pengadaan tiang *an!ang ba$a dia. 711mm t;12 mm (tn"

    5017 Pen)ambungan iang Pan!ang 'a$a (bua#"

    5018 Pemtngan iang Pan!ang (bua#"

    5019 Penutu* iang Pan!ang

    5020 /e*atu iang Pan!ang

    5021 Pengadaan ngku% udukan iang List%ik

    5022 Pengadaan Plat 'a$a

    5023 Pengadaan ngku% Plat Landas atalk

    5024 Pengadaan P%Ml 'a$a

    5025 Pengadaan ngku% udukan ,ngsel -'

    5026 Pengadaan 'lla%d 70 n

    5027 Pengadaan 'lla%d 25 tn

    5028 nst%uksi 'a$a untuk -' (kg"

    5029 nst%uksi 'a$a untuk G%ntal G%ame l*#in (kg"

    5030 Pengadaan 1 set n!#% /tainles /tile K 50 mm

    5031 Plate landas 700 300 12 in!. angku% K 16 mm

    5032 Pengadaan Gende% e%maga Pen)ebe%angan

    5033 Pengadaan ngku% P%tal 'a$a Penggantung :id%lik (b#"

    5034 Pengadaan dan Pemasangan Gende% Pelindung -'

    5035 Pembuatan dan Pemasangan G%ntal G%ame Pelindung -'

    5036 Pengadaan 'nde

    5037 La*isan P%ime ating 6070 (25 kgm2"

    5038 Pengadaan ,ngsel -eable '%idge (unit"

    5039 'ia)a %ans*%t -ate%ial da%i %ks#* ke /ite (lstn"

    5040 Pengadaan P%tal Penggantung :id%lik

    5041 'ia)a ,%e!tin (tn"

    5042 Pengadaan a!kle ,le!t%i! a*asitas 35 tnunit

    5043 Pengadaan

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    49/160

    5049 Pengadaan la%m 'alan!e%

    5050

    5051 nstalasi Pene%angan

    5052 Pengadaan dan Pemasangan LPJ (/la% ell"

    5053 Pengadaan ' Panel Pene%angan

    5054 *a# dan alat *embuatan betn be%tulang @225

    5055 *a# dan *e%alatan *eke%$aan betn isi tiang mutu @225

    Pemasangan #)d%aulik !)linde% instalasi *embe%si#an *i*a dan li untuk *e%asinal testing dan t%aining

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    50/160

    Sa!uan Ha0ga U6a* Ha0ga Ba*an Ha0ga Ala! Ha0ga Jad

    m3 R* 80814.96 R* @ R* 80814.96

    !m R* 231.15 R* 279.06 R* 1416.64 R* 1926.84

    R* 44991.52 R* @ R* 2033.00 R* 47024.52

    R* 8089.56 R* 57.25 R* 14.81 R* 8161.62

    m2 R* 48528.46 R* 58829.75 R* @ R* 107358.21

    unit R* 351613.77 R* 513500.00 R* 457960.00 R* 1323073.77

    unit R* 3925.95 R* 6846.67 R* 4361.52 R* 15134.14

    b# R* 13740.83 R* 23963.33 R* 15265.34 R* 52969.50

    unit R* 320543.25 R* 559011.40 R* 356106.40 R* 1235661.05

    unit R* 687.04 R* 1198.17 R* 763.27 R* 2648.48

    set R* @ R* 589943.00 R* @ R* 589943.00

    set R* @ R* 979983.11 R* @ R* 979983.11

    set R* @ R* 1488548.30 R* @ R* 1488548.30

    set R* @ R* 2615005.00 R* @ R* 2615005.00

    set R* @ R* 6930255.93 R* @ R* 6930255.93

    set R* @ R* 7608761.35 R* @ R* 7608761.35

    kg R* 9416.00 R* @ R* 9416.00

    s#i>t R* @ R* @ R* 2943784.00 R* 2943784.00

    b# R* @ R* 79584467.97 R* @ R* 79584467.97

    set R* @ R* 5045183.75 R* @ R* 5045183.75

    b# R* @ R* 6108672.55 R* @ R* 6108672.55

    set R* @ R* 3851063.75 R* @ R* 3851063.75

    m? R* @ R* 23590.83 R* @ R* 23590.83

    m? R* @ R* 26215.00 R* @ R* 26215.00

    b# R* @ R* 225266.20 R* @ R* 225266.20

    b# R* @ R* 232970.20 R* @ R* 232970.20

    set R* 32325.98 R* @ R* 32325.98set R* @ R* 230180.20 R* @ R* 230180.20

    set R* @ R* 507608.20 R* @ R* 507608.20

    set R* @ R* 35526407.00 R* @ R* 35526407.00

    m? R* 3825.96 R* @ R* 438.70 R* 4264.66

    m? R* 2801.95 R* @ R* 372.90 R* 3174.84

    m2 R* 35017.12 R* 28844.70 R* 138231.70 R* 202093.52

    m3 R* 66349.08 R* @ R* 66349.08

    set R* 122653.21 R* 441047.46 R* @ R* 563700.67

    b# R* 36915.00 R* @ R* 36915.00

    set R* @ R* 32936000.00 R* @ R* 32936000.00

    set R* @ R* 26686000.00 R* @ R* 26686000.00

    set R* @ R* 555961.78 R* @ R* 555961.78

    set R* @ R* 400961.78 R* @ R* 400961.78

    set R* @ R* 4493544.83 R* @ R* 4493544.83

    set R* @ R* 373900920.00 R* @ R* 373900920.00

    m2 R* 8283.53 R* @ R* 8283.53

    set R* @ R* 353263190.00 R* @ R* 353263190.00

    set R* @ R* 127711433.25 R* @ R* 127711433.25

    setset R* @ R* 151169507.50 R* @ R* 151169507.50

    set R* @ R* 12450000.00 R* @ R* 12450000.00

    set R* 51115.46 R* @ R* 51115.46

    set R* @ R* 34436000.00 R* @ R* 34436000.00

    m2 R* 23495.10 R* 33625.71 R* @ R* 57120.81

    m? R* 8283.53 R* @ R* 8283.53

    R* 45256.38 R* @ R* 45256.38

    set R* @ R* 4981724.75 R* @ R* 4981724.75

    R* 167450.72 R* 6420.00 R* 524407.00 R* 698277.72

    R* 205168.22 R* 51570.04 R* 3274200.00 R* 3530938.26

    m3 R* 1487.00 R* 54955.20 R* 152099.70 R* 208541.90

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    51/160

    m3 R* 3256.60 R* 249180.74 R* 76719.31 R* 329156.65

    R* 3252.60 R* 262620.37 R* 136129.04 R* 402002.01

    m3 R* 895209.41 R* 4437143.74 R* 500893.75 R* 5833246.90

    m3 R* 858245.13 R* 4823533.42 R* 500893.75 R* 6182672.30

    m3 R* 1744232.26 R* 7807746.44 R* 500893.75 R* 10052872.44

    m3 R* 172882.38 R* 726471.76 R* 500893.75 R* 1400247.89

    m3 R* 474252.38 R* 2920258.72 R* 500893.75 R* 3895404.85

    m3 R* 1617531.95 R* 6820941.53 R* 500893.75 R* 8939367.23

    R* 2642.49 R* 128606.17 R* 70926.20 R* 202174.85

    m2 R* 102798.56 R* 373110.28 R* 203300.00 R* 679208.84

    m3 R* 1487.00 R* 54955.20 R* 152099.70 R* 208541.90

    m? R* @ R* 305485.00 R* @ R* 305485.00

    tn R* @ R* 15000000.00 R* @ R* 15000000.00

    b# R* 83246.16 R* 349900.70 R* 171893.16 R* 605040.02

    b# R* 18840.63 R* 367545.00 R* 178904.00 R* 565289.63

    R* 67925.27 R* 566297.50 R* 171893.16 R* 806115.93

    R* 153208.91 R* 1053736.00 R* 687572.64 R* 1894517.55

    set R* @ R* 333394.88 R* @ R* 333394.88

    set R* @ R* 13733.45 R* @ R* 13733.45

    set R* @ R* 278200.00 R* @ R* 278200.00

    set R* @ R* 13733.45 R* @ R* 13733.45

    set R* @ R* 2852834.00 R* @ R* 2852834.00

    b# R* @ R* 64735000.00 R* @ R* 64735000.00

    b# R* @ R* 26215000.00 R* @ R* 26215000.00

    kg R* 14369.67 R* 16444.30 R* 44490.60 R* 75304.56

    kg R* 18703.93 R* 17781.80 R* 29660.40 R* 66146.13

    set R* @ R* 1396515.85 R* @ R* 1396515.85

    R* @ R* 503782.00 R* @ R* 503782.00

    set R* @ R* 36915000.00 R* @ R* 36915000.00

    b# R* @ R* 18372777.40 R* @ R* 18372777.40

    set R* 366433.27 R* 29960000.00 R* @ R* 30326433.27

    R* 2885213.27 R* 159447222.72 R* @ R* 162332435.99

    set R* @ R* 493270.00 R* @ R* 493270.00

    25 kgm2 R* 306.65 R* 22192.34 R* 14450.75 R* 36949.74

    set R* @ R* 32100000.00 R* @ R* 32100000.00

    lstn R* 1889085.00 R* @ R* 1889085.00

    set R* @ R* 184771131.00 R* @ R* 184771131.00

    tn R* 2140000.00 R* @ R* 2140000.00

    unit R* @ R* 400655936.00 R* @ R* 400655936.00

    set R* @ R* 272850000.00 R* @ R* 272850000.00

    set R* @ R* 4900172.00 R* @ R* 4900172.00

    set R* @ R* 2300500000.00 R* @ R* 2300500000.00

    R* @ R* 930900000.00 R* @ R* 930900000.00

    b# R* @ R* 55739510.00 R* @ R* 55739510.00

    *kt R* @ R* 455584921.00 R* @ R* 455584921.00

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    52/160

    set R* @ R* 22898000.00 R* @ R* 22898000.00

    R* 125939000.00 R* @ R* 125939000.00

    R* @ R* 36059.00 R* @ R* 36059.00

    set R* @ R* 40071500.00 R* @ R* 40071500.00

    set R* @ R* 34347000.00 R* @ R* 34347000.00

    R* 166166.40 R* @ R* 500893.75 R* 667060.15

    R* 17960.57 R* @ R* 500893.75 R* 518854.32

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    53/160

    AnlsID Nama Analsa Ha0ga Sa!uan Pe#e0/aan

    ANALISA HARGA SATUAN PEKERJAAN FASILITAS KESELAMATAN JALAN

    8001

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    54/160

    8045 Pengadaan 'a#an PLL enaga /u%)a /im*ang 3

    8046 Pengadaan 'a#an PLL /im*ang 3

    8047 Pengadaan 'a#an PLL /im*ang 4 (set"

    8048 Pengadaan 'a#an LPJ nensinal (set"

    8049 Pasang /tel Lam*u (set"

    8050 Pengadaan LPJ /la% ell (/et"

    8051 Pasang 'ekesting Pndasi Rambu Lalu Lintas

    8052 =ngks Penge!atan ma%ka 3mm 120 mm (m?"

    8053 =ngks Pemasangan Paku Jalan 'ulat (tem*e%ed"

    8055

    ANALISA HARGA SATUAN PEKERJAAN FASILITAS PELABUHAN PENEBERANGAN

    5001 Penguku%an dan Psitining (Pembangunan e%maga /P"

    5002 Pene%angan dan eselamatan e%$a

    5003 %ugan dan Pemadatan ana# (subg%ade" (m3"

    5004 %ugan dan Pemadatan /i%tu (untuk subbase" (m3"

    5005 %ugan dan Pemadatan 'atu Pe!a# ('ase u%se"

    5006 'etn 'e%tulang @225 untuk Pelat /t%ess (m3"

    5007 'etn 'e%tulang @225 untuk 'alk dan Pile a* %estle

    5008 'etn 'e%tulang @225 'alk iang Railing ansteen

    5009 'etn @175 tan*a ulangan

    5010 'etn si iang Pan!ang

    5011 'etn /elimut iang

    5012 s*al Penet%asi t;75 !m *adat

    5013 'ekisting (m2"

    5014 %ugan Pasi% dan Pemadatan (sub g%ade" (m3"

    5015 Pengadaan *i*a %ailing 25H (m?"

    5016 Pengadaan tiang *an!ang ba$a dia. 711mm t;12 mm (tn"

    5017 Pen)ambungan iang Pan!ang 'a$a (bua#"

    5018 Pemtngan iang Pan!ang (bua#"

    5019 Penutu* iang Pan!ang

    5020 /e*atu iang Pan!ang

    5021 Pengadaan ngku% udukan iang List%ik

    5022 Pengadaan Plat 'a$a

    5023 Pengadaan ngku% Plat Landas atalk

    5024 Pengadaan P%Ml 'a$a

    5025 Pengadaan ngku% udukan ,ngsel -'

    5026 Pengadaan 'lla%d 70 n

    5027 Pengadaan 'lla%d 25 tn

    5028 nst%uksi 'a$a untuk -' (kg"

    5029 nst%uksi 'a$a untuk G%ntal G%ame l*#in (kg"

    5030 Pengadaan 1 set n!#% /tainles /tile K 50 mm

    5031 Plate landas 700 300 12 in!. angku% K 16 mm

    5032 Pengadaan Gende% e%maga Pen)ebe%angan

    5033 Pengadaan ngku% P%tal 'a$a Penggantung :id%lik (b#"

    5034 Pengadaan dan Pemasangan Gende% Pelindung -'

    Pengadaan 'a#an Paga% Pengaman Jalan (engan Rambu #e%n" )*e 2 + e%minal ,nd Lengkung

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    55/160

    5035 Pembuatan dan Pemasangan G%ntal G%ame Pelindung -'

    5036 Pengadaan 'nde

    5037 La*isan P%ime ating 6070 (25 kgm2"

    5038 Pengadaan ,ngsel -eable '%idge (unit"

    5039 'ia)a %ans*%t -ate%ial da%i %ks#* ke /ite (lstn"

    5040 Pengadaan P%tal Penggantung :id%lik

    5041 'ia)a ,%e!tin (tn"

    5042 Pengadaan a!kle ,le!t%i! a*asitas 35 tnunit

    5043 Pengadaan

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    56/160

    24

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    57/160

    65

    66

    67 Pasangan bata me%a# uk. (51122" !m tebal 12 bata 1 P! + 1 Ps(m2"

    68

    69

    70

    71

    72

    73

    74

    75

    76

    77 Pasangan dinding #llbl!k (:'" 20 (m2" (/A 6897+2008@16"

    78 Pasangan dinding #llbl!k (:'" 15(m2" (/A 6897+2008@18"

    79 Pasangan dinding #llbl!k (:'" 10(m2"

    80 Pasangan dinding !nbl!k ('" 20(m2"

    81 Pasangan dinding !nbl!k ('" 15(m2"

    82 Pasangan dinding !nbl!k ('" 10(m2"

    83 Pasang dinding lantai(m2"

    84 Pasang dinding %ste%te%aang (12 11 24" !m(m2" (/A 6897+2008@22"

    85 Pasangan dinding batak(m2"

    86 Pasang bata be%ngga (5 11 24" !m(m2" (/A 6897+2008@24"

    87 Pasang dinding an)aman bambu %angka ka)u(m2"

    88 Pleste%an 1 P! + 1 Ps tebal 15 mm(m2" (/A 2837+2008@01"

    89 Pleste%an 1 P! + 2 Ps tebal 15 mm(m2" (/A 2837+2008@02"

    90 Pleste%an 1 P! + 3 Ps tebal 15 mm(m2" (/A 2837+2008@03"

    91 Pleste%an 1 P! + 4 Ps tebal 15 mm(m2" (/A 2837+2008@04"

    92 Pleste%an 1 P! + 5 Ps tebal 15 mm(m2" (/A 2837+2008@05"

    93 Pleste%an 1 P! + 6 Ps tebal 15 mm(m2" (/A 2837+2008@06"

    94 Pleste%an 1 P! + 8 Ps tebal 15 mm(m2" (/A 2837+2008@08"

    95 Pleste%an 1 P! + 0.5 * + 3 Ps tebal 15 mm(m2" (/A 2837+2008@09"

    96 Pleste%an 1 P! + 3 * + 10 Ps tebal 15 mm(m2"

    97 Pleste%an 0.5 P! + 3 * + 4 Ps tebal 15 mm(m2"

    98 Pleste%an 1 * + 1 /m + 1 Ps tebal 15 mm(m2" (/A 2837+2008@011"

    99 Pleste%an 1 * + 1 /m + 2 Ps tebal 15 mm(m2" (/A 2837+2008@12"

    100 Pleste%an 1 P! + 2 Ps tebal 20 mm(m2" (/A 2837+2008@013"

    101 Pleste%an 1 P! + 3 Ps tebal 20 mm(m2" (/A 2837+2008@14"

    102 Pleste%an 1 P! + 4 Ps tebal 20 mm(m2" (/A 2837+2008@15"

    103 Pleste%an 1 P! + 5 Ps tebal 20 mm(m2" (/A 2837+2008@16"

    104 Pleste%an 1 P! + 6 Ps tebal 20 mm(m2" (/A 2837+2008@17"

    105 Pleste%an 1 * + 1 /m + 2 Ps tebal 20 mm(m2" (/A 2837+2008@18"

    106 Pleste%an 1 P! + 2 Ps tebal 25 mm(m2"

    107 Pleste%an 1 P! + 3 Ps tebal 25 mm(m2"

    Pasangan bata me%a# uk. (51122" !m tebal 1 bata 1 P! + 5 Ps(m2" (/A6897+2008@04"

    Pasangan bata me%a# uk. (51122" !m tebal 1 bata 1 P! + 6 Ps(m2" (/A6897+2008@05"

    Pasangan bata me%a# uk. (51122" !m tebal 12 bata 1 P! + 2 Ps(m2" (/A6897+2008@07"

    Pasangan bata me%a# uk. (51122" !m tebal 12 bata 1 P! + 3 Ps(m2" (/A6897+2008@08"

    Pasangan bata me%a# uk. (51122" !m tebal 12 bata 1 P! + 4 Ps(m2" (/A6897+2008@09"

    Pasangan bata me%a# uk. (51122" !m tebal 12 bata 1 P! + 5 Ps(m2" (/A6897+2008@10"

    Pasangan bata me%a# uk. (51122" !m tebal 12 bata 1 P! + 6 Ps(m2" (/A6897+2008@11"

    Pasangan bata me%a# uk. (51122" !m tebal 12 bata 1 P! + 8 Ps(m2" (/A6897+2008@12"

    Pasangan bata me%a# uk. (51122" !m tebal 12 bata 1 P! + 3 * + 10 Ps(m2" (/A 6897+2008@13"

    Pasangan bata me%a# uk. (51122" !m tebal 12 bata 1 * + 1 /m + 1Ps(m2" (/A 6897+2008@14"

    Pasangan bata me%a# uk. (51122" !m tebal 12 bata 1 * + 1 /m + 2

    Ps(m2" (/A 6897+2008@15"

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    58/160

    108 Pleste%an 1 P! + 4 Ps tebal 25 mm(m2"

    109 Pleste%an 1 P! + 5 Ps tebal 25 mm(m2"

    110 Pleste%an 1 P! + 2 Ps tebal 30 mm(m2"

    111 Pleste%an 1 P! + 3 Ps tebal 30 mm(m2"

    112 Pleste%an 1 P! + 4 Ps tebal 30 mm(m2"

    113 Pleste%an 1 P! + 5 Ps tebal 30 mm(m2"

    114 'e%a*en 1 P! + 3 Ps tebal 30 mm(m2"

    115 'e%a*en 1 P! + 5 Ps tebal 15 mm(m2" (/A 2837+2008@19"

    116 Pleste%an betn 1 P! + 2 Ps tebal 15 mm(m2"

    117 Pleste%an betn 1 P! + 3 Ps tebal 15 mm(m2"

    118 Pleste%an skning 1 P! + 2 Ps(m2" (/A 2837+2008@20"

    119

    120 Pleste%an te%as 1 P! a%na + 2 batu te%as tebal 10 m (/A 2837+2008@22"

    121 Pleste%an !i*%at 1 P! + 2 Ps(m2" (/A 2837+2008@23"

    122 Pleste%an sia% adukan 1 P! + 2 Ps(m2" (/A 2837+2008@26"

    123 Pleste%an ate%*%> bata!te 3 la*is(m2"

    124 'enangan(m1"

    125 /ia%an dengan s*esi 1 *! Q 2 *s(m2"

    126 !ian (m2" (/A 2837+2008@27"

    127 'etn tumbuk 1 P! + 3 Ps + 5 %(m3" (/A 91@0008@2007@01"

    128 'etn tumbuk 1 P! + 3 Ps + 6 %(m3"

    129 'etn tumbuk 1 P! + 4 Ps + 6 %(m3"

    130

    131

    132

    133

    134

    135

    136

    137

    138

    139

    140

    141 Pasang bekisting untuk *ndasi(m2" (/A 7394@2008@20"

    142 Pasang bekisting untuk sl>(m2" (/A 7394@2008@21"

    143 Pasang bekisting untuk klm(m2" (/A 7394@2008@22"

    144 Pasang bekisting untuk balk(m2" (/A 7394@2008@23"

    145 Pasang bekisting untuk *lat lantai(m2" (/A 7394@2008@24"

    146 Pasang bekisting untuk tangga(m2" (/A 7394@2008@26"

    147 Pasang bekisting untuk dinding(m2" (/A 7394@2008@25"

    148 Pembesian dengan besi *ls(kg"

    149 Pembesian dengan besi uli%(kg"

    150 Pembesian engan 'esi Pls atau 'esi li% (10 kg" (/A 7394@2008@17"

    Pleste%an g%anit 1 P! a%na + 2 g%anit tebal 10 mm(m2" (/A 2837+2008@21"

    'etn 'e%tulang 1+2+3 .100 (m3" (/A 7394@2008@01" >?!;7.4 -*a slum*(12I2" !m !;0.87

    'etn 'e%tulang 1+2+3 .125 (m3" (/A 7394@2008@02" >?!;9.8 -*a slum*(12I2" !m !;0.78

    'etn 'e%tulang 1+2+3 .150 (m3" (/A 7394@2008@03" >?!;12.2 -*a slum*(12I2" !m !;0.72

    'etn 'e%tulang 1+2+3 .175 (m3" (/A 7394@2008@05" >?!;14.5 -*a slum*(12I2" !m !;0.66

    'etn 'e%tulang 1+2+3 .200 (m3" (/A 7394@2008@06" >?!;16.9 -*a slum*(12I2" !m !;0.61

    'etn 'e%tulang 1+2+3 .225 (m3" (/A 7394@2008@07" >?!;19.3 -*a slum*(12I2" !m !;0.58

    'etn 'e%tulang 1+2+3 .250 (m3" (/A 7394@2008@01" >?!;21.7 -*a slum*(12I2" !m !;0.56

    'etn 'e%tulang 1+2+3 .275 (m3" (/A 7394@2008@01" >?!;24.0 -*a slum*

    (12I2" !m !;0.53'etn 'e%tulang 1+2+3 .300 (m3" (/A 7394@2008@10" >?!;26.4 -*a slum*(12I2" !m !;0.52

    'etn 'e%tulang 1+2+3 .325 (m3" (/A 7394@2008@11" >?!;28.8 -*a slum*(12I2" !m !;0.49

    'etn 'e%tulang 1+2+3 .350 (m3" (/A 7394@2008@12" >?!;31.2 -*a slum*(12I2" !m !;0.48

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    59/160

    151 Pembesian engan 'esi li% (10 kg" (/A 91@0008@2007@21"

    152 Pembesian engan 'esi Pls (110 kg" (/A 91@0008@2007@22"

    153 Pembesian engan 'esi Pls (120 kg" (/A 91@0008@2007@23"

    154 Pembesian engan 'esi Pls (130 kg" (/A 91@0008@2007@24"

    155 Pembesian engan 'esi Pls (140 kg" (/A 91@0008@2007@25"

    156 Pembesian engan 'esi Pls (150 kg" (/A 91@0008@2007@26"

    157 Pembesian engan 'esi Pls (200 kg" (/A 91@0008@2007@27"

    158 Pembesian engan 'esi Pls (250 kg" (/A 91@0008@2007@28"

    159

    160

    161

    162

    163

    164

    165

    166

    167

    168 Pembesian engan 'esi Pls (225 kg" (/A 91@0008@2007@58"

    169

    170 % 'etn /t%use .200 imete% 25 m (m3" (/A 91@0008@2007@39"

    171 % 'etn /t%use .250 imete% 50 m (/A 91@0008@2007@39a"

    172

    173 lm 'etn 'e%tulang .225 k. 2040 3040 (/A 91@0008@2007@41"

    174 lm 'etn 'e%tulang .250 k. 2040 3040 (/A 91@0008@2007@42"

    175 lm 'etn 'e%tulang .225 k. 3050 3550 (/A 91@0008@2007@43"

    176 lm 'etn 'e%tulang .250 k. 3050 3550 (/A 91@0008@2007@44"

    177

    178

    179 'alk 'etn 'e%tulang .175 k. 1515 1520 (/A 91@0008@2007@47"

    180

    181 'alk 'etn 'e%tulang .225 k. 1530 2030 (/A 91@0008@2007@49"

    182 'alk 'etn 'e%tulang .225 k. 2540 3050 (/A 91@0008@2007@50"

    183 'alk 'etn 'e%tulang .250 k. 2540 3050 (/A 91@0008@2007@51"

    184

    185

    186

    187

    188 angga 'etn 'e%tulang .225 (/A 91@0008@2007@56"

    189 angga 'etn 'e%tulang .250 (/A 91@0008@2007@57"

    190 Lantai ke%$a betn tumbuk 1 P! + 3 Ps + 5 % tebal 5

    191 iang *an!ang *%est%essed betn (m3"

    192 'etn dengan *uCCdit# @ 100 SR(m3"

    Pndasi 'etn 'e%tulang .175 (m3" ('ekistingT120 kg Pembesian" (/A 91@0008@2007@29"

    Pndasi 'etn 'e%tulang .200 (m3" ('ekistingT120 kg Pembesian" (/A 91@0008@2007@30"

    Pndasi 'etn 'e%tulang .225 (m3" ('ekistingTPembesian 120kg" (/A 91@0008@2007@31"

    Pndasi 'etn 'e%tulang .250 (m3" ('ekistingTPembesian 120kg" (/A 91@0008@2007@32"

    /l> 'etn 'e%tulang (m3" .200 k. 1515 1520 (/A 91@0008@2007@

    33"/l> 'etn 'e%tulang (m3" .225 k. 2025 2030 (/A 91@0008@2007@34"

    /l> 'etn 'e%tulang (m3" .225 k. 2040 3040(/A 91@0008@2007@35"

    /l> 'etn 'e%tulang (m3" .250 k. 2025 2030(/A 91@0008@2007@36"

    /l> 'etn 'e%tulang (m3" .250 k. 2040 3040 (/A 91@0008@2007@37"

    lm P%aktis 'tn 'e%tulang .175 k. 11111515 (m3" (/A 91@0008@2007@38"

    lm 'etn 'e%tulang .225 k. 1525 1530 2030 (/A 91@0008@2007@40"

    lm 'etn 'e%tulang .225 k. 3060 3560 4070 (/A 91@0008@2007@45"

    lm 'etn 'e%tulang .250 k. 3060 3560 4070 (/A 91@0008@2007@46"

    'alk 'etn 'e%tulang .200 k. 1520 1530 2030 (/A 91@0008@200748"

    'alk 'etn 'e%tulang .225 k. 3060 3070 3080 (/A 91@0008@2007@52"

    'alk 'etn 'e%tulang .250 k. 3060 3070 3080 (/A 91@0008@2007@53"

    Plat Lantai 'etn 'e%tulang .225 b. 10 & 12 m (/A 91@0008@2007@54"

    Plat Lantai 'etn 'e%tulang .250 b. 10 & 12 m (/A 91@0008@2007@

    55"

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    60/160

    193 'etn !am*u%an 1 P! + 2 Ps + 3 %(m3"

    194 'etn !am*u%an 1 P! + 2 Ps + 4 %(m3"

    195 'etn !am*u%an 1 P! + 1.5 Ps + 3 %(m3"

    196 'etn !am*u%an 1 P! + 1.5 Ps + 2.5 %(m3"

    197 'etn !am*u%an 1 P! + 1 Ps + 1 %(m3"

    198 'etn keda* ai% dengan st%% @ 100(m3" (/A 7394@2008@13"

    199 Pasang PB ate%st* leba% 150 mm(m1" (/A 7394@2008@14"

    200 Pasang PB ate%st* leba% 200 mm(m1" (/A 7394@2008@15"

    201 Pasang PB ate%st* leba% 230 mm(m1" (/A 7394@2008@16"

    202 Pasang PB ate%st* leba% 250 mm(m1" (/A 7394@2008@16"

    203 Pasang PB ate%st* leba% 300 mm(m1" (/A 7394@2008@16"

    204 Pasang PB ate%st* leba% 320 mm(m1" (/A 7394@2008@16"

    205 abel *%est%essed *lsst%ands (10 kg" (/A 7394@2008@18"

    206 Jembatan !% alang %(m2" (/A 7394@2008@27"

    207 Pndasi betn be%tulang (150 kg besi T bekisting"(m3" (/A 7394@2008@28"

    208 /l> betn be%tulang (200 kg besi T bekisting"(m3" (/A 7394@2008@29"

    209 lm betn be%tulang (300 kg besi T bekisting"(m3" (/A 7394@2008@30"

    210 'alk betn be%tulang (200 kg besi T bekisting"(m3" (/A 7394@2008@31"

    211 Plat betn be%tulang (150 kg besi T bekisting"(m3" (/A 7394@2008@32"

    212 inding betn be%tulang (150 kg besi T bekisting"(m3" (/A 7394@2008@33"

    213 inding betn be%tulang (200 kg besi T bekisting"(m3"

    214 lm *%aktis betn be%tulang (11 11" !m (m?"

    215 Ring balk betn be%tulang (10 15" !m( m?"

    216 Pemasangan 'a$a P%Ml G(kg"

    217 Pemasangan 'a$a anal (kg"

    218 Pemasangan 'aut nke% 'a$a(kg"

    219 katan ngin%ekstang(kg"

    220 Plendes(kg"

    221 'etn @175(m3"

    222 'ekisting ka)u te%masuk *embngka%an(m2"

    704 Ja%ing aat 'a$ai%emes# (kg" (/A 7394@2008@19"

    224 Pasang kusen *intu dan $endela ka)u kelas (m3" (/A 3434+2008@1"

    225 Pasang kusen *intu dan $endela ka)u kelas (m3" (/A 3434+2008@2"

    226 Pasang kusen *intu dan $endela ka)u kelas (m3" (/A 3434+2008@2"

    227 Pasang kusen *intu dan $endela ka)u me%anti(m3"

    228 Pasang *intu klam* ka)u $ati(m2"

    229 Pasang *intu klam* ka)u kelas standa% (m2" (/A 3434+2008@3"

    230

    231 Pasang *intu klam* ka)u b%ne (m2"

    232 Pasang *intu *anel ka)u kelas (m2" (/A 3434+2008@5"

    233 Pasang daun *intu *anel ka)u kelas (m2" (/A 3434+2008@5"

    234 Pasang *intu *anel ka)u b%ne (m2"

    235 Pasang *intu *anel ka)u me%anti(m2"

    236 Pasang *intu dan $endela ka!a ka)u kelas (m2" (/A 3434+2009@6"

    237 Pasang *intu dan $endela ka!a ka)u kelas (m2" (/A 3434+2008@6"

    Pasang *intu klam* sede%#ana ka)u kelas untuk gudang sementa%a (m2" (/A 3434+2008@4"

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    61/160

    238 Pasang *intu dan $endela ka!a ka)u b%ne (m2"

    239 Pasang *intu dan $endela ka!a ka)u me%anti(m2"

    240 Pasang *intu dan $endela $alusi ka)u kelas (m2" (/A 3434+2008@7"

    241 Pasang *intu dan $endela $alusi ka)u kelas (m2" (/A 3434+2008@7"

    242 Pasang *intu dan $endela $alusi ka)u b%ne (m2"

    243 Pasang *intu dan $endela $alusi ka)u me%anti(m2"

    244

    245 Pasang *intu *l)d %angka* %angka e*se ka)u kelas (m2"

    246

    247 Pasang *intu *l)d %angka* %angka ka)u me%anti(m2"

    248 Pasang $alusi mati kusen ka)u kelas (m2" (/A 3434+2008@10"

    249 Pasang $alusi mati kusen ka)u kelas (m2" (/A 3434+2008@10"

    250 Pasang $alusi mati kusen ka)u b%ne(m2"

    251 Pasang $alusi mati kusen ka)u me%anti(m2"

    252

    253 Pasang *intu teakd %angka* %angka ka)u kam*e%(m2"

    254 Pasang *intu teakd %angka* %angka ka)u b%ne(m2"

    255 Pasang *intu teakd %angka* %angka ka)u me%anti(m2"

    256 Pasang *intu teakd dan >%mika %angka ka)u kelas (m2"

    257 Pasang *intu *l)d dan >%mika %angka ka)u kam*e% (m2"

    258 Pasang *intu *l)d dan >%mika %angka ka)u b%ne(m2

    259 Pasang *intu *l)d dan >%mika %angka ka)u me%anti(m2"

    260 Pasang *intu teakd dan >%mika %angka ka)u $ati (m2"

    261 Pasang *intu teakd dan >%mika %angka ka)u kam*e% (m2"

    262 Pasang *intu teakd dan >%mika %angka ka)u b%ne (m2"

    263 Pasang *intu teakd dan >%mika %angka ka)u me%anti

    264 Pasang *intu >%mika duble %angka ka)u $ati(m2"

    265 Pasang *intu >%mika duble %angka ka)u kam*e%(m2"

    266 Pasang *intu >%mika duble %angka ka)u b%ne(m2"

    267 Pasang *intu >%mika duble %angka ka)u me%anti(m2"

    268

    269

    270

    271 Pasang knst%uksi kuda@kuda ka)u bengki%ai(m3"

    272 Pasang knst%uksi kuda@kuda ka)u k%uing(m3"

    273 Pasang knst%uksi kuda@kuda ka)u me%anti(m3"

    274 Pasang kas 57 T %eng 35 genteng biasa ka)u $ati(m2"

    275 Pasang kas 57 T %eng 35 genteng biasa ka)u kam*e%(m2

    276 Pasang kas 57 T %eng 35 genteng biasa ka)u b%ne(m2

    277 Pasang kas 57 T %eng 35 genteng biasa ka)u bengki%ai(m2"

    278 Pasang kas 57 T %eng 35 genteng biasa ka)u k%uing (m2"

    279 Pasang kas 57 T %eng 35 genteng biasa ka)u me%anti (m2"

    280 Pasang kas 57 T %eng 35 genteng ka%ang*ilang ka)u $ati (m2"

    281 Pasang kas 57 T %eng 35 genteng ka%ang*ilang ka)u kam*e% (m2"

    Pasang *intu *l)d %angka* %angka te%tutu* ka)u kelas (m2" (/A3434+2008@8"

    Pasang *intu *l)d %angka* %angka e*se ka)u kelas (m2" (/A3434+2008@9"

    Pasang *intu teakd %angka* %angka e*se ka)u kelas (m2" (/A3434+2008@11"

    Pasang knst%uksi kuda@kuda knensinal ka)u kelas bentang 6 mete%

    (m3" (/A 3434+2008@13"Pasang knst%uksi kuda@kuda ka)u knensinal kelas bentang 6 mete%(m3" (/A 3434+2008@13"

    Pasang knst%uksi kuda@kuda knensinal ka)u kelas bentang 6 mete%(m3" (/A 3434+2008@13"

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    62/160

    282 Pasang kas 57 T %eng 35 genteng ka%ang*ilang ka)u b%ne (m2"

    283 Pasang kas 57 T %eng 35 genteng ka%ang*ilang ka)u bengki%ai (m2"

    284 Pasang kas 57 T %eng 35 genteng ka%ang*ilang ka)u k%uing (m2"

    285 Pasang kas 57 T %eng 35 genteng ka%ang*ilang ka)u me%anti (m2"

    286 Pasang kas 57 T %eng 35 genteng betn ka)u $ati(m2"

    287 Pasang kas 57 T %eng 35 genteng betn ka)u kam*e% (m2"

    288 Pasang kas 57 T %eng 35 genteng betn ka)u b%ne (m2"

    289 Pasang kas 57 T %eng 35 genteng betn ka)u bengki%ai

    290 Pasang kas 57 T %eng 35 genteng betn ka)u k%uing (m2"

    291 Pasang kas 57 T %eng 35 genteng betn ka)u me%anti (m2"

    292 Pasang kas 57 T %eng 35 genteng *alentng ke!il ka)u b%ne (m2"

    293 Pasang kas 57 T %eng 35 genteng *alentng ke!il ka)u me%anti (m2"

    294 Pasang kas 57 T %eng 35 genteng *alentng ke!il ka)u k%uing (m3"

    295 Pasang kas 57 T %eng 35 genteng *alentng ke!il ka)u bengki%ai (m2"

    296 Pasang kas 57 T %eng 35 genteng *alentng ke!il ka)u me%anti (m2"

    297 Pasang kas 57 T %eng 35 genteng *alentng ke!il ka)u $ati (m2"

    298 Pasang kas 57 T %eng 35 genteng kdk glaCuu% ka)u $ati (m2"

    299 Pasang kas 57 T %eng 35 genteng kdk glaCuu% ka)u kam*e%

    300 Pasang kas 57 T %eng 35 genteng kdk glaCuu% ka)u bengki%ai (m2"

    301 Pasang kas 57 T %eng 35 genteng kdk glaCuu% ka)u b%ne

    302 Pasang kas 57 T %eng 35 genteng kdk glaCuu% ka)u kam*e%

    303 Pasang kas 57 T %eng 35 genteng kdk glaCuu% ka)u me%anti

    304 Pasang kas 57 T %eng 35 genteng *alentng su*e%besa% ka)u $ati (m2"

    305

    306

    307

    308

    309

    310 Pasang kas 57 T %eng 35 genteng as*al ka)u $ati(m2"

    311 Pasang kas 57 T %eng 35 genteng as*al ka)u kam*e%(m2"

    312 Pasang kas 57 T %eng 35 genteng as*al ka)u b%ne(m2"

    313 Pasang kas 57 T %eng 35 genteng as*al ka)u bengki%ai(m2"

    314 Pasang kas 57 T %eng 35 genteng as*al ka)u k%uing(m2

    315 Pasang kas 57 T %eng 35 genteng as*al ka)u me%anti (m2"

    316 Pasang kas 57 T %eng 35 genteng metal ka)u $ati (m2"

    317 Pasang kas 57 T %eng 35 genteng metal ka)u kam*e% (m2"

    318 Pasang kas 57 T %eng 35 genteng metal ka)u b%ne (m2"

    319 Pasang kas 57 T %eng 35 genteng metal ka)u bengki%ai (m2"

    320 Pasang kas 57 T %eng 35 genteng metal ka)u k%uing(m2"

    321 Pasang kas 57 T %eng 35 genteng metal ka)u me%anti(m2"

    322 Pasang kas 57 T %eng 35 ata* si%a* ka)u $ati(m2"

    323 Pasang kas 57 T %eng 35 ata* si%a* ka)u kam*e%(m2"

    324 Pasang kas 57 T %eng 35 ata* si%a* ka)u b%ne(m2"

    325 Pasang kas 57 T %eng 35 ata* si%a* ka)u bengki%ai(m2

    Pasang kas 57 T %eng 35 genteng *alentng su*e%besa% ka)u kam*e%(m2"

    Pasang kas 57 T %eng 35 genteng *alentng su*e%besa% ka)u bengki%ai(m2"

    Pasang kas 57 T %eng 35 genteng *alentng su*e%besa% ka)u k%uing(m2"

    Pasang kas 57 T %eng 35 genteng *alentng su*e%besa% ka)u me%anti(m2"

    Pasang kas 57 T %eng 35 genteng *alentng su*e%besa% ka)u b%ne(m2"

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    63/160

    326 Pasang kas 57 T %eng 35 ata* si%a* ka)u k%uing(m2"

    327 Pasang kas 57 T %eng 35 ata* si%a* ka)u me%anti(m2"

    328 Pasang %angka langit@langit (1.0 1.0" m ka)u $ati(m2

    329 Pasang %angka langit@langit (1.0 1.0" m ka)u kam*e%(m2"

    330 Pasang %angka langit@langit (1.0 1.0" m ka)u b%ne(m2"

    331 Pasang %angka langit@langit (1.0 1.0" m ka)u bengki%(m2"

    332 Pasang %angka langit@langit (1.0 1.0" m ka)u k%uing(m2"

    333 Pasang %angka langit@langit (1.0 1.0" m ka)u me%anti(m2"

    334 Pasang %angka langit@langit (30 60" !m ka)u $ati(m2"

    335 Pasang %angka langit@langit (30 60" !m ka)u kam*e%(m2"

    336 Pasang %angka langit@langit (30 60" !m ka)u b%ne(m2"

    337 Pasang %angka langit@langit (30 60" !m ka)u bengki%ai(m2"

    338 Pasang %angka langit@langit (30 60" !m ka)u k%uing(m2"

    339 Pasang %angka langit@langit (30 60" !m ka)u me%anti(m2"

    340 Pasang %angka langit@langit (30 30" !m ka)u $ati(m2"

    341 Pasang %angka langit@langit (30 30" !m ka)u kam*e%(m2"

    342 Pasang %angka langit@langit (30 30" !m ka)u b%ne(m2"

    343 Pasang %angka langit@langit (30 30" !m ka)u bengki%ai(m2"

    344 Pasang %angka langit@langit (30 30" !m ka)u k%uing(m2"

    345 Pasang %angka langit@langit (30 30" !m ka)u me%anti(m2"

    346 Pasang lis*lang uku%an (3 20" !m ka)u $ati(m1"

    347 Pasang lis*lang uku%an (3 20" !m ka)u kam*e%(m1"

    348 Pasang lis*lang uku%an (3 20" !m ka)u b%ne(m1"

    349 Pasang lis*lang uku%an (3 20" !m ka)u bengki%ai(m1"

    350 Pasang lis*lang uku%an (3 20" !m ka)u k%uing(m1"

    351 Pasang lis*lang uku%an (3 20" !m ka)u me%anti(m1"

    352 Pasang lis*lang uku%an (3 30" !m ka)u $ati(m1"

    353 Pasang lis*lang uku%an (3 30" !m ka)u kam*e%(m1"

    354 Pasang lis*lang uku%an (3 30" !m ka)u b%ne(m1"

    355 Pasang lis*lang uku%an (3 30" !m ka)u bengki%ai(m1"

    356 Pasang lis*lang uku%an (3 30" !m ka)u k%uing(m1"

    357 Pasang lis*lang uku%an (3 30" !m ka)u me%anti(m1"

    358 Pasang lis*lang uku%an 2 (3 20" !m ka)u $ati(m1"

    359 Pasang lis*lang uku%an 2 (3 20" !m ka)u kam*e%(m1"

    360 Pasang lis*lang uku%an 2 (3 20" !m ka)u b%ne(m1"

    361 Pasang lis*lang uku%an 2 (3 20" !m ka)u bengki%ai(

    362 Pasang lis*lang uku%an 2 (3 20" !m ka)u k%uing(m1"

    363 Pasang lis*lang uku%an 2 (3 20" !m ka)u me%anti(m1

    364 Pasang lis*lang uku%an 2 (2 20" !m ka)u $ati(m1"

    365 Pasang lis*lang uku%an 2 (2 20" !m ka)u kam*e%(m1"

    366 Pasang lis*lang uku%an 2 (2 20" !m ka)u b%ne(m1"

    367 Pasang lis*lang uku%an 2 (2 20" !m ka)u bengki%ai(m1"

    368 Pasang lis*lang uku%an 2 (2 20" !m ka)u k%uing(m1"

    369 Pasang lis*lang uku%an 2 (2 20" !m ka)u me%anti(m1

    370 Pasang %angka dinding *emisa# ka)u $ati(m1"

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    64/160

    371 Pasang %angka dinding *emisa# ka)u kam*e%(m1"

    372 Pasang %angka dinding *emisa# ka)u b%ne(m1"

    373 Pasang %angka dinding *emisa# ka)u me%anti(m1"

    374

    375

    376 Pasang %angka dinding *emisa# teakd %angka* %angka ka)u k%uing

    377 Pasang %angka dinding *emisa# teakd %angka* %angka ka)u bengki%ai

    378 Pasang %angka dinding *emisa# *l)d %angka* %angka ka)u b%ne

    379 Pasang %angka dinding *emisa# *l)d %angka* %angka ka)u me%anti (m2"

    380 Pasang %angka dinding *emisa# *l)d %angka* %angka ka)u k%uing (m2"

    381

    382 Pasang dinding lamb%iCi%ing da%i *a*an $ati(m2"

    383 Pasang dinding lamb%iCi%ing da%i *a*an kam*e%(m2"

    384 Pasang *l)d tebal 4 mm untuk dinding(m2"

    385 Pasang list *la>n ka)u *%Ml(m1"

    386 Peke%$aan ate%*%Mng(m2"

    387 Pasang ata* genteng biasa e. -alang(m2"

    388 Pasang ata* genteng *%ess e.%enggalek(m2"

    389 Pasang ata* genteng ka%ang*ilang e. -alang(m2"

    390 Pasang ata* genteng ka%ang*ilang e. %enggalek(m2"

    391 Pasang ata* genteng ka%ang*ilang e. /u%aba)a(m2"

    392 Pasang bubung genteng biasa e. -alang(m1"

    393 Pasang bubung genteng *%ess e. %enggalek(m1"

    394 Pasang bubung genteng ka%ang*ilang e. -alang(m1"

    395 Pasang bubung genteng ka%ang*ilang e. %enggalek(m1"

    396 Pasang bubung genteng ka%ang*ilang e. /u%aba)a(m1"

    397 Pasang ata* genteng *alentng ke!il(m2"

    398 Pasang ata* genteng kdk glaCuu%(m2"

    399 Pasang ata* genteng *alentng su*e% besa%(m2"

    400 Pasang ata* genteng betn(m2"

    401 Pasang ata* genteng as*al(m2"

    402 Pasang ata* genteng metal(m2"

    403 Pasang ata* si%a*(m2"

    404 Pasang bubung genteng *alentng ke!il(m1"

    405 Pasang bubung genteng kdk glaCuu%(m1"

    406 Pasang bubung genteng *alentng su*e% besa%(m1"

    407 Pasang bubung genteng betn(m1"

    408 Pasang bubung genteng as*al(m1"

    409 Pasang bubung genteng metal(m1"

    410 Pasang bubung ata* si%a*(m1"

    411 Pasang ata* asbes gelmbang (3.00 1.05 m" 4 mm(m2"

    412 Pasang ata* asbes gelmbang (2.70 1.05 m" 4 mm(m2"

    413 Pasang ata* asbes gelmbang (2.40 1.05 m" 4 mm(m2"

    414 Pasang ata* asbes gelmbang (2.10 1.05 m" 4 mm(m2"

    415 Pasang ata* asbes gelmbang (1.50 1.05 m" 4 mm(m2"

    Pasang %angka dinding *emisa# teakd %angka* %angka ka)u b%ne(/A 3434+2008@24"

    Pasang %angka dinding *emisa# teakd %angka* %angka ka)u me%anti

    (m2"

    Pasang %angka dinding *emisa# *l)d %angka* %angka ka)u bengki%ai(m2"

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    65/160

    416 Pasang ata* asbes gelmbang (2.50 0.92 m" 5 mm(m2"

    417 Pasang ata* asbes gelmbang (2.25 0.92 m" 5 mm(m2"

    418 Pasang ata* asbes gelmbang (2.00 0.92 m" 5 mm(m2"

    419 Pasang ata* asbes gelmbang (1.80 0.92 m" 5 mm(m2"

    420 Pasang ata* asbes gelmbang (3.00 1.08 m" 6 mm(m2"

    421 Pasang ata* asbes gelmbang (2.70 1.08 m" 6 mm(m2"

    422 Pasang ata* asbes gelmbang (2.10 1.08 m" 6 mm(m2"

    423 Pasang ata* asbes gelmbang (1.80 1.08 m" 6 mm(m2"

    424 Pasang nk stel gelmbang 0.92 m(m1"

    425 Pasang nk stel gelmbang 1.05 m(m1"

    426 Pasang nk stel gelmbang 1.08 m(m1"

    427 Pasang nk *aten 0.92 m(m1"

    428 Pasang nk *aten 1.05 m(m1"

    429 Pasang nk *aten 1.08 m(m1"

    430 Pasang nk stel %ata 0.92 m(m1"

    431 Pasang nk stel %ata 1.05 m(m1"

    432 Pasang ata* seng gelmbang (m2"

    433 Pasang bubung seng gelmbang (m1"

    434 Pasang ta* luminium(m2"

    435 Pasang 'ubung ta* luminium(m2"

    436 Pasang La*isan luminium Gil/esalatin(m2"

    437 Pasang %> lig#t Mb%eglass(m2"

    438 Pasang ata* *l)!a%bnat(m2"

    439 Pasang ta* /eng

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    66/160

    461 Langit@langit asbes (100 100" m 35 mm T %angka ka)u k%uing

    462 Langit@langit asbes (100 100" m 35 mm T %angka ka)u bengki%ai

    463 Langit@langit asbes (100 100" m 35 mm T %angka ka)u kam*e%

    464 Langit@langit asbes (100 100" m 35 mm T %angka ka)u $ati

    465 Langit@langit *l)d 4 mm T %angka ka)u $ati(m2"

    466 Langit@langit *l)d 4 mm T %angka ka)u kam*e%(m2"

    467 Langit@langit *l)d 4 mm T %angka ka)u b%ne(m2"

    468 Langit@langit *l)d 4 mm T %angka ka)u bengki%ai(m2"

    469 Langit@langit *l)d 4 mm T %angka ka)u k%uing(m2"

    470 Langit@langit *l)d 4 mm T %angka ka)u me%anti(m2"

    471 Langit@langit akustik (30 60" !m T %angka ka)u $ati(m

    472 Langit@langit akustik (30 60" !m T %angka ka)u kam*e%

    473 Langit@langit akustik (30 60" !m T %angka ka)u b%ne

    474 Langit@langit akustik (30 60" !m T %angka ka)u bengki

    475 Langit@langit akustik (30 60" !m T %angka ka)u k%uing

    476 Langit@langit akustik (30 60" !m T %angka ka)u me%ant

    477 Langit@langit akustik (30 30" !m T %angka ka)u $ati(m

    478 Langit@langit akustik (30 30" !m T %angka ka)u kam*e%

    479 Langit@langit akustik (30 30" !m T %angka ka)u b%ne

    480 Langit@langit akustik (30 30" !m T %angka ka)u bengki

    481 Langit@langit akustik (30 30" !m T %angka ka)u k%uing

    482 Langit@langit akustik (30 30" !m T %angka ka)u me%ant

    483 Langit@langit g)*sum ba%d tebal 9 mm(m2"

    484 List langit@langit ka)u *%Ml(m1"

    485 List langit@langit g)*sum(m1"

    486 Pasang klset $ngkk te%as(b#"

    487 Pasang klset $ngkk *%selin k. (b#"

    488 Pasang klset $ngkk lu(b#"

    489 Pasang klset duduk *%selin k. (b#"

    490 Pasang klset duduk lu(b#"

    491 Pasang bua# u%ini%(b#"

    492 Pasang asta>el k. (b#"

    493 Pasang asta>el lu(b#"

    494 Pasang tem*at sabun ke%amik(b#"

    495 Pasang bak mandi te%as lume 0.3 m3(b#"

    496 Pasang bak mandi Mb%eglass lume 0.3 m3(b#"

    497 Pasang bak mandi batu bata lume 0.3 m3(b#"

    498 Pasang badki* *%selen(b#"

    499 -emasang bak betn lume 1.0 m3(b#"

    500 -emasang *i*a *en)alu% ai% limba# $enis *i*a tana# dia. 6!m

    501 -emasang *i*a *en)alu% ai% limba# $enis *i*a tana# dia. 8!m

    502 -emasang *i*a betn diamete% 20 !m(m1"

    503 -emasang *i*a betn diamete% 30 !m(m1"

    504 -emasang *i*a betn diamete% 40 !m(m1"

    505 -emasang *i*a betn diamete% 50 !m(m1"

  • 8/17/2019 Harga Transportas Jaln Pg 19sd38

    67/160

    506 -emasang *i*a betn diamete% 60 !m(m1"

    507 -emasang *i*a betn diamete% 80 !m(m1"

    508 -emasang *i*a betn diamete% 90 !m(m1"

    509 -emasang *i*a betn diamete% 100 !m(m1"

    510 -emasang bak knt%l *asangan batu bata (30 30 35"

    511 -emasang bak knt%l *asangan batu bata (45 45 60"

    512 -emasang bak knt%l *asangan batu bata (60 60 65"

    513 -emasang *i*a galanis diamete% 12H(m1"

    514 -emasang *i*a galanis diamete% 34H(m1"

    515 -emasang *i*a galanis diamete% 1H(m1"

    516 -emasang *i*a galanis diamete% 1 12H(m1"

    517 -emasang *i*a galanis diamete% 2H(m1"

    518 -emasang *i*a galanis diamete% 2 12H(m1"