LAPORAN LAPORAN NOVEMBER 2007 NOVEMBER 2007 STUDI KELAYAKAN FLY OVER JALAN ARTERI UTARA TIMUR STUDI KELAYAKAN FLY OVER JALAN ARTERI UTARA TIMUR DEPARTEMEN PEKERJAAN UMUM DIREKTORAT JENDERAL BINA MARGA SATKER NVT PERENCANAAN DAN PENGAWASAN JALAN DAN JEMBATAN PROPINSI DAERAH ISTIMEWA YOGYAKARTA Jalan Ring Road Utara Maguwoharjo, Depok, Sleman, Yogyakarta - Telp (0274)488583 - Kode Pos 55282 AKHIR

description

FS

Transcript of fs-bab1-2

  • LAPORAN LAPORAN

    NOVEMBER 2007NOVEMBER 2007

    STUDI KELAYAKAN FLY OVER JALAN ARTERI UTARA TIMUR STUDI KELAYAKAN FLY OVER JALAN ARTERI UTARA TIMUR

    DEPARTEMEN PEKERJAAN UMUMDIREKTORAT JENDERAL BINA MARGASATKER NVT PERENCANAAN DAN PENGAWASAN JALAN DAN JEMBATANP R O P I N S I D A E R A H I S T I M E W A Y O G Y A K A R T AJalan Ring Road Utara Maguwoharjo, Depok, Sleman, Yogyakarta - Telp (0274)488583 - Kode Pos 55282

    AKHIRAKHIR

  • Studi Kelayakan Fly Over Jalan Arteri Utara Timur (Paket-7)

    Laporan Akhir

    ii

    KATA PENGANTAR

    Laporan Akhir pada Pekerjaan Studi Kelayakan Fly Over Jalan Arteri Utara

    Timur ini diserahkan untuk memenuhi persyaratan sesuai dengan yang tercantum dalam

    Kontrak.

    Laporan ini terdiri atas bab-bab Pendahuluan, Gambaran Wilayah Studi,,

    Metodologi dan Pendekatan , Kajian Teknis Fly Over, Kajian Lingkungan, Pemodelan dan

    Peramalan Lalulintas, Analisis Biaya Investasi dan Operasi, Analisis Manfaat, Analisis

    Kelayakan Ekonomi dan Kesimpulan dan Rekomendasi. Sesuai dengan Kerangka Acuan

    Kerja, maka laporan ini dibuat rangkap 5 (lima).

    Dalam kesempatan ini konsultan mengucapkan terima kasih kepada Satker

    Perencanaan dan Pengawasan Jalan dan Jembatan Propinsi Daerah Istimewa Yogyakarta,

    Direktorat Jenderal Bina Marga, Departemen Pekerjaan Umum yang telah memberikan

    kesempatan kepada kami untuk melaksanakan pekerjaan ini.

    Yogyakarta, November 2007

    PT. Perentjana Djaja

    Ir. Joseph N,M.Sc Team Leader

  • Studi Kelayakan Fly Over Jalan Arteri Utara Timur (Paket-7)

    Laporan Akhir

    iii

    DAFTAR ISI

    Halaman Judul......................................................................................................... i

    Kata Pengantar ........................................................................................................ ii

    Daftar Isi .................................................................................................................. iii

    Daftar Tabel ............................................................................................................ ix

    Daftar Gambar ........................................................................................................ xvi

    Daftar Lampiran ...................................................................................................... xviii

    BAB 1. PENDAHULUAN ...................................................................................... Bab 1 - 1

    1.1. LATAR BELAKANG ............................................................................ Bab 1 - 1

    1.2. MAKSUD DAN TUJUAN .................................................................... Bab 1 - 1

    1.3. LINGKUP KEGIATAN ........................................................................ Bab 1 - 2

    1.4. MANFAAT YANG DIHARAPKAN ................................................... Bab 1 - 2

    1.5. LOKASI KEGIATAN ............................................................................ Bab 1 - 2

    BAB 2. DESKRIPSI WILAYAH STUDI.............................................................. Bab 2 - 1

    2.1. DAERAH ISTIMEWA YOGYAKARTA ............................................. Bab 2 - 1

    2.1.1. Letak Geografis dan Topografis .............................................. Bab 2 - 1

    2.1.2. Klimatologi dan Hidrologi ...................................................... Bab 2 - 2

    2.1.3. Kondisi Geologi ........................................................................ Bab 2 - 2

    2.1.4. Wilayah Administratif ............................................................. Bab 2 - 2

    2.1.5. Perkembangan dan Penyebaran Penduduk .......................... Bab 2 3

    2.1.6. Sistem Perhubungan................................................................. Bab 2 - 4

    2.2. PROGRAM PEMBANGUNAN DAERAH ....................................... Bab 2 11

    2.2.1. Visi dan Misi Pembangunan Daerah...................................... Bab 2 11

    2.2.2. Pertanahan dan Penataan Ruang ............................................ Bab 2 11

    2.2.3. Kebijakan Kawasan Handalan Yogyakarta dan Sekitarnya Bab 2 - 12

  • Studi Kelayakan Fly Over Jalan Arteri Utara Timur (Paket-7)

    Laporan Akhir

    iv

    BAB 3. METODOLOGI DAN PENDEKATAN............................................... Bab 3 - 1

    3.1. POLA PIKIR PENENTUAN JENIS SIMPANG ............................... Bab 3 - 1

    3.2. DIAGRAM ALIR AKTIVITAS PEKERJAAN..................................... Bab 3 - 3

    3.3. PEKERJAAN PERSIAPAN ................................................................... Bab 3 - 5

    3.4. SURVAI PENDAHULUAN ................................................................. Bab 3 - 6

    3.5. PENGUMPULAN DATA SEKUNDER ............................................. Bab 3 - 6

    3.6. REVIEW DATA ..................................................................................... Bab 3 7

    3.6.1. Kajian Studi Terdahulu............................................................... Bab 3 7

    3.6.2. Pemilihan Lokasi Fly Over ......................................................... Bab 3 - 8

    3.7. PENGUMPULAN DATA PRIMER .................................................... Bab 3 - 8

    3.7.1. Survai lalulintas .......................................................................... Bab 3 - 8

    3.7.2. Survai Geoteknik ......................................................................... Bab 3 - 10

    3.7.3. Survai Lingkungan ..................................................................... Bab 3 - 10

    3.8. SUPPLY ANALYSIS (ANALISIS SOSIAL EKONOMI) ................... Bab 3 - 10

    3.9. KAJIAN LINGKUNGAN ..................................................................... Bab 3 - 11

    3.10. DEMAND ANALYSIS ........................................................................... Bab 3 11

    3.10.1. Analisis Surplus Konsumsi (Biaya Operasi Kendaraan) .... Bab 3 11

    3.10.2. Analisis Nilai Waktu................................................................. Bab 3 16

    3.11. ANALISIS LALULINTAS .................................................................... Bab 3 - 16

    3.12. ANALISIS KELAYAKAN .................................................................... Bab 3 - 16

    3.12.1. Kelayakan Teknis ..................................................................... Bab 3 - 16

    3.12.2. Kelayakan Sosial ....................................................................... Bab 3 - 18

    3.12.3. Kelayakan Ekonomi .................................................................. Bab 3 - 18

    BAB 4. KAJIAN TEKNIS FLY OVER.................................................................. Bab 4 - 1

    4.1. DESAIN JEMBATAN LAYANG.......................................................... Bab 4 1

    4.2. BENTUK-BENTUK SIMPANG TAK SEBIDANG............................. Bab 4 4

  • Studi Kelayakan Fly Over Jalan Arteri Utara Timur (Paket-7)

    Laporan Akhir

    v

    4.3. PENERAPAN BENTUK SIMPANG TAK SEBIDANG .................... Bab 4 9

    4.3.1. Simpang Gejayan ......................................................................... Bab 4 9

    4.3.2. Simpang Kentungan.................................................................... Bab 4 11

    4.3.3. Simpang Jombor .......................................................................... Bab 4 - 13

    4.4. SIMPANG TAK SEBIDANG BENTUK SEDERHANA .................... Bab 4 14

    4.4.1. Simpang UPN............................................................................... Bab 4 15

    4.4.2. Simpang Gejayan ......................................................................... Bab 4 16

    4.4.3. Simpang Kentungan.................................................................... Bab 4 17

    4.4.4. Simpang Jombor .......................................................................... Bab 4 18

    4.4.5. Simpang Monjali .......................................................................... Bab 4 21

    4.4.6. Elevated Road .............................................................................. Bab 4 22

    4.4.7. Perbandingan Perkiraan Pembebasan Lahan.......................... Bab 4 22

    BAB 5. ANALISIS LINGKUNGAN .................................................................. Bab 5 - 1

    5.1. LATAR BELAKANG ............................................................................. Bab 5 1

    5.2. TUJUAN DAN KEGUNAAN PROYEK ............................................. Bab 5 2

    5.3. KONDISI EKSISTING TATA GUNA LAHAN ................................. Bab 5 3

    5.3.1. Simpang Jombor ......................................................................... Bab 5 3

    5.3.2. Simpang Monjali......................................................................... Bab 5 5

    5.3.3. Simpang Kentungan .................................................................. Bab 5 7

    5.3.4. Simpang Gejayan........................................................................ Bab 5 9

    5.3.5. Simpang UPN ............................................................................. Bab 5 11

    5.3.6. Simpang Maguwo ...................................................................... Bab 5 14

    5.4. PENGELOLAAN LINGKUNGAN...................................................... Bab 5 15

    BAB 6. PEMODELAN DAN PERAMALAN ARUS LALULINTAS............ Bab 6 - 1

    6.1. INVENTARISASI RUAS JALAN........................................................ Bab 6 1

    6.2. MATRIKS ASAL TUJUAN ................................................................... Bab 6 2

  • Studi Kelayakan Fly Over Jalan Arteri Utara Timur (Paket-7)

    Laporan Akhir

    vi

    6.3. VALIDASI ............................................................................................... Bab 6 4

    6.4. PEMBEBANAN ARUS LALULINTAS ............................................... Bab 6 6

    6.4.1. Model All or Nothing ................................................................ Bab 6 6

    6.4.2. Model Equilibrium Assignment.................................................... Bab 6 6

    6.4.3. Model Stochastic Assignment ....................................................... Bab 6 7

    6.5. FORECASTING....................................................................................... Bab 6 8

    6.5.1. Peramalan Kinerja Jaringan Jalan pada Tahun 2013 ............. Bab 6 9

    6.5.2. Peramalan Kinerja Jaringan Jalan pada Tahun 2018 ............. Bab 6 10

    6.6. PEMBERLAKUAN SKENARIO DO SOMETHING ......................... Bab 6 12

    6.6.1. Pemberlakuan Skenario pada Tahun 2008 (Base Year) .......... Bab 6 13

    6.6.2. Pemberlakuan Skenario pada Tahun 20013 ........................... Bab 6 13

    6.6.3. Pemberlakuan Skenario pada Tahun 20018 ........................... Bab 6 14

    6.7. ANALISIS NILAI MANFAAT ............................................................. Bab 6 16

    6.8. ANALISIS NILAI TUNDAAN LALULINTAS .................................. Bab 6 19

    BAB 7. ANALISIS BIAYA INVESTASI DAN OPERASI.............................. Bab 7 - 1

    7.1. KOMPONEN BIAYA............................................................................. Bab 7 1

    7.1.1. Biaya Investasi.............................................................................. Bab 7 1

    7.1.2. Biaya Pemeliharaan ..................................................................... Bab 7 2

    7.2. ASUMSI YANG DIGUNAKAN........................................................... Bab 7 2

    7.2.1. Nilai Uang ................................................................................... Bab 7 2

    7.2.2. Kenaikan Biaya Pemeliharaan.................................................. Bab 7 2

    7.2.3. Pengadaan Tanah ....................................................................... Bab 7 2

    7.2.4. Skenario Pembangunan Fly Over ............................................ Bab 7 3

    7.3. PERHITUNGAN BIAYA PEMBANGUNAN JALAN...................... Bab 7 3

    7.3.1. Rencana Pentahapan Pembangunan ....................................... Bab 7 3

    7.3.2. Biaya Pembebasan Tanah dan Bangunan ............................... Bab 7 3

  • Studi Kelayakan Fly Over Jalan Arteri Utara Timur (Paket-7)

    Laporan Akhir

    vii

    7.3.3. Biaya Pembangunan Fly Over.................................................. Bab 7 7

    7.3.4. Harga Satuan Dasar ................................................................... Bab 7 8

    7.3.5. Bahan............................................................................................ Bab 7 8

    7.3.6. Perkiraan Biaya Kontstruksi ..................................................... Bab 7 - 9

    7.3.7. Biaya Pemeliharaan.................................................................... Bab 7 11

    7.3.8. Biaya Desain dan Supervisi ...................................................... Bab 7 12

    7.3.9. Biaya Keseluruhan ..................................................................... Bab 7 13

    7.3.10. Analisis Biaya Konstruksi ......................................................... Bab 7 13

    BAB 8. ANALISIS MANFAAT .......................................................................... Bab 8 - 1

    8.1. Analisis Manfaat ................................................................................... Bab 8 1

    8.2. Analisis Biaya Operasi Kendaraan Dan Nilai Waktu Perjalanan .. Bab 8 2

    8.2.1. Persamaan yang Digunakan .................................................... Bab 8 5

    8.2.2. Jenis Kendaraan yang Digunakan dalam Hitungann .......... Bab 8 5

    8.2.3. Harga Hitungan ......................................................................... Bab 8 6

    8.2.4. Hitungan Biaya Operasi Kendaraan ....................................... Bab 8 8

    8.2.5. Hitungan Nilai Waktu Perjalanan .......................................... Bab 8 10

    8.3. Nilai Manfaat ......................................................................................... Bab 8 12

    BAB 9. ANALISIS KELAYAKAN EKONOMI ............................................... Bab 9 - 1

    9.1. Umum ..................................................................................................... Bab 9 1

    9.2. Dasar-Dasar Analisis ............................................................................ Bab 9 3

    9.2.1. Kriteria Pengambilan Keputusan ........................................... Bab 9 3

    9.2.2. Nilai Finansial Dan Ekonomi ................................................... Bab 9 3

    9.2.3. Sumber Pembiayaan ................................................................. Bab 9 4

    9.3. Analisis Kelayakan Ekonomi .............................................................. Bab 9 8

    9.3.1. Skenario 1 ................................................................................... Bab 9 8

    9.3.2. Skenario 2 ................................................................................... Bab 9 10

  • Studi Kelayakan Fly Over Jalan Arteri Utara Timur (Paket-7)

    Laporan Akhir

    viii

    9.3.3. Skenario 3 ................................................................................... Bab 9 12

    9.3.4. Skenario 4 ................................................................................... Bab 9 14

    9.3.5. Skenario 5 ................................................................................... Bab 9 16

    9.3.6. Skenario 6 ................................................................................... Bab 9 18

    9.3.7. Skenario 7 ................................................................................... Bab 9 20

    9.3.8. Skenario 8 ................................................................................... Bab 9 22

    9.3.9. Skenario 9 ................................................................................... Bab 9 24

    9.3.10. Skenario 10 ................................................................................. Bab 9 26

    BAB 10. KESIMPULAN DAN REKOMENDASI ........................................... Bab 10 - 1

    LAMPIRAN

  • Studi Kelayakan Fly Over Jalan Arteri Utara Timur (Paket-7)

    Laporan Akhir

    ix

    DAFTAR TABEL

    Tabel 2.1. Ibukota dan Luas Wilayah di Daerah Administratif

    Provinsi DIY Tahun 2005.................................................................... Bab 2 3

    Tabel 2.2. Jumlah Penduduk Menurut Kabupaten/Kota di DI Yogyakarta

    Tahun 2005............................................................................................ Bab 2 3

    Tabel 2.3. Panjang Jalan Negara menurut Keadaan Jalan dan

    Kabupaten/Kota di Provinsi DI Yogyakarta Tahun 2005 ........... Bab 2 6

    Tabel 2.4. Panjang Jalan Provinsi menurut Keadaan Jalan dan

    Kabupaten/Kota di Provinsi DI Yogyakarta Tahun 2005 ........... Bab 2 7

    Tabel 2.5. Panjang Jalan Kabupaten/Kota menurut Keadaan Jalan dan

    Kabupaten/Kota di Provinsi DI Yogyakarta Tahun 2005 ........... Bab 2 8

    Tabel 2.6. Jumlah Kendaraan Bermotor yang Terdaftar menurut Jenisnya

    di Provinsi DI Yogyakarta Tahun 2005 ........................................... Bab 2 9

    Tabel 2.7. Jumlah Kendaraan Bermotor yang Terdaftar menurut Kabupaten

    di Provinsi DI Yogyakarta Tahun 2005 ........................................... Bab 2 10

    Tabel 2.8. Arus lalulintas Penumpang dan barang Dalam Negeri

    melalui Bandar Udara Adisucipto per Bulan

    di Provinsi DI Yogyakarta Tahun 2005 ........................................... Bab 2 10

    Tabel 2.9. Tipologi Pengembangan Kecamatan Sebagai Pusat Pertumbuhan

    Ekonomi di Provinsi DI Yogyakarta Tahun 2005........................... Bab 2 14

    Tabel 4.1. Perbandingan Perkiraan Pembebasan Lahan Pembangunan

    Simpang tak Sebidang di Jalan Arteri Utara Timur ...................... Bab 5 19

    Tabel 5.1. Kaitan Rencana Kegiatan dengan Dampak Yang Ditimbulkan

    (Isu Pokok)............................................................................................ Bab 5 19

    Tabel 6.1. Kapasitas Ruas Jalan dalam Area Studi ......................................... Bab 6 2

    Tabel 6.2. Nama Zona dalam Area Studi ......................................................... Bab 6 3

    Tabel 6.3. Data Matriks Asal Tujuan Pada Jam Sibuk Berdasarkan

    Informasi Arus Lalulintas ................................................................ Bab 6 4

    Tabel 6.4. Data Matriks Asal Tujuan Pada Jam Sibuk Setelah Divalidasi ... Bab 6 5

    Tabel 6.5. Nilai Arus Lalulintas di RingRoad ................................................... bab 6 6

  • Studi Kelayakan Fly Over Jalan Arteri Utara Timur (Paket-7)

    Laporan Akhir

    x

    Tabel 6.6. Kinerja Jaringan Jalan pada Kondisi Saat Ini (Eksisting)

    dengan menganggap nilai waktu Rp. 1/menit ............................. Bab 6 7

    Tabel 6.7. Kinerja Jaringan Jalan pada Tahun 2013 ........................................ Bab 6 10

    Tabel 6.8. Nilai Arus Lalulintas di RingRoad Tahun 2013 .............................. Bab 6 10

    Tabel 6.9. Kinerja Jaringan Jalan pada Tahun 2018 dengan menganggap

    nilai waktu Rp 1/menit .................................................................... Bab 6 10

    Tabel 6.10. Nilai Arus Lalulintas di RingRoad Tahun 2018 .............................. Bab 6 11

    Tabel 6.11. Kenaikan Arus Lalulintas di RingRoad Tanpa Melakukan

    Penanganan (do nothing) .................................................................. Bab 6 12

    Tabel 6.12. Kinerja Jaringan Jalan pada Tahun 2008 dengan Penanganan

    (do something) ...................................................................................... Bab 6 13

    Tabel 6.13. Kinerja Jaringan Jalan pada Tahun 2013 dengan Penanganan

    (do something) ...................................................................................... Bab 6 13

    Tabel 6.14. Kinerja Jaringan Jalan pada Tahun 2018 dengan Penanganan

    (do something) ...................................................................................... Bab 6 15

    Tabel 6.15. Nilai Manfaat dari Skenario yang Dilakukan ................................ Bab 6 16

    Tabel 6.16. Perhitungan Nilai Manfaat Akibat Dilakukannya Satu

    Tindakan (do something) .................................................................... Bab 6 17

    Tabel 6.17. Nilai Manfaat dari Skenario yang Dilakukan ................................ Bab 6 19

    Tabel 6.18. Tundaan yang terjadi pada Tahun 2008 ......................................... Bab 6 18

    Tabel 6.19. Tundaan yang terjadi pada Tahun 2013 ........................................ Bab 6 19

    Tabel 6.20. Tundaan yang terjadi pada Tahun 2018 ......................................... Bab 6 19

    Tabel 7.1. Jadwal Pembangunan Fly Over dan Underpass.............................. Bab 7 3

    Tabel 7.2. Prakiraan Harga Satuan Pembebasan Tanah dan Ganti Rugi

    Bongkar Bangunan di Kab. Sleman ................................................ Bab 7 4

    Tabel 7.3. Biaya Pembebasan Tanah dan Bangunan Pembangunan Fly Over

    di Simpang Gejayan Kab. Sleman ................................................... Bab 7 5

    Tabel 7.4. Biaya Pembebasan Tanah dan Bangunan Pembangunan Fly Over

    di Simpang Jombor Kab. Sleman ..................................................... Bab 7 5

    Tabel 7.5. Biaya Pembebasan Tanah dan Bangunan Pembangunan

    Underpass di Simpang UPN Kab. Sleman ...................................... Bab 7 5

    Tabel 7.6. Biaya Pembebasan Tanah dan Bangunan Pembangunan Fly Over

    di Simpang Kentungan Kab. Sleman .............................................. Bab 7 5

  • Studi Kelayakan Fly Over Jalan Arteri Utara Timur (Paket-7)

    Laporan Akhir

    xi

    Tabel 7.7. Biaya Pembebasan Tanah dan Bangunan Pembangunan

    Underpass di Simpang Monjali Kab. Sleman .................................. Bab 7 6

    Tabel 7.8. Biaya Pembebasan Tanah dan Bangunan Pembangunan

    Elevated Road di Jalan Arteri Utara Timur Kab. Sleman ............... Bab 7 6

    Tabel 7.9. Biaya Pembebasan Tanah dan Bangunan Pembangunan

    Fly Over Alternatif 1 di Simpang Jombor Kab. Sleman ................ Bab 7 6

    Tabel 7.10. Biaya Pembebasan Tanah dan Bangunan Pembangunan

    Fly Over Alternatif 2 di Simpang Jombor Kab. Sleman ................ Bab 7 6

    Tabel 7.11. Harga Satuan Pekerjaan ................................................................... Bab 7 7

    Tabel 7.12. Perkiraan Biaya Konstruksi Fly Over dan Underpass .................. Bab 7 10

    Tabel 7.13. Biaya-biaya yang dikeluarkan untuk Pembangunan dan

    Pemeliharaan Fly Over dan Underpass ......................................... Bab 7 13

    Tabel 7.14. Analisis Biaya Pembangunan dan Pemeliharaan Fly Over

    Jalan Arteri Utara Timur Skenario 1 ............................................... Bab 7 14

    Tabel 7.15. Analisis Biaya Pembangunan dan Pemeliharaan Fly Over

    Jalan Arteri Utara Timur Skenario 2 ............................................... Bab 7 14

    Tabel 7.16. Analisis Biaya Pembangunan dan Pemeliharaan Fly Over

    Jalan Arteri Utara Timur Skenario 3 ............................................... Bab 7 15

    Tabel 7.17. Analisis Biaya Pembangunan dan Pemeliharaan Fly Over

    Jalan Arteri Utara Timur Skenario 4 ............................................... Bab 7 15

    Tabel 7.18. Analisis Biaya Pembangunan dan Pemeliharaan Fly Over

    Jalan Arteri Utara Timur Skenario 5 ............................................... Bab 7 16

    Tabel 7.19. Analisis Biaya Pembangunan dan Pemeliharaan Fly Over

    Jalan Arteri Utara Timur Skenario 6 ............................................... Bab 7 16

    Tabel 7.20. Analisis Biaya Pembangunan dan Pemeliharaan Fly Over

    Jalan Arteri Utara Timur Skenario 7 ............................................... Bab 7 17

    Tabel 7.21. Analisis Biaya Pembangunan dan Pemeliharaan Fly Over

    Jalan Arteri Utara Timur Skenario 8 ............................................... Bab 7 17

    Tabel 7.22. Analisis Biaya Pembangunan dan Pemeliharaan Fly Over

    Jalan Arteri Utara Timur Skenario 9 ............................................... Bab 7 18

    Tabel 7.23. Analisis Biaya Pembangunan dan Pemeliharaan Fly Over

    Jalan Arteri Utara Timur Skenario 10 ............................................. Bab 7 18

    Tabel 8.1. Karakter Analisis Ekonomi .............................................................. Bab 8 1

  • Studi Kelayakan Fly Over Jalan Arteri Utara Timur (Paket-7)

    Laporan Akhir

    xii

    Tabel 8.2. Faktor-faktor BOK dengan Nilai Waktu ........................................ Bab 8 4

    Tabel 8.3. Faktor-faktor BOK Tanpa Nilai Waktu .......................................... Bab 8 4

    Tabel 8.4. Asumsi yang Digunakan .................................................................. Bab 8 5

    Tabel 8.5. Spesifikasi Kendaraan ....................................................................... Bab 8 6

    Tabel 8.6. Komposisi Kendaraan ....................................................................... Bab 8 6

    Tabel 8.7. Harga Kendaraan (Harga Konstan 2007) ...................................... Bab 8 7

    Tabel 8.8. Harga Ban Kendaraan (Harga Konstan 2006) .............................. Bab 8 7

    Tabel 8.9. Harga Bahan Bakar dan Oli (harga konstan 2007) ........................ Bab 8 7

    Tabel 8.10. Upah Tenaga Kerja ............................................................................ Bab 8 8

    Tabel 8.11. Biaya Operasi Kendaraan (Rp/kend-km) ...................................... Bab 8 9

    Tabel 8.12. Prediksi Biaya Operasi Kendaraan ................................................. Bab 8 10

    Tabel 8.13. Perhitungan Nilai Waktu Berdasar Jenis Kendaraan ................... Bab 8 13

    Tabel 8.14. Prediksi Kinerja Skenario 1- 10 ........................................................ Bab 3 12

    Tabel 8.15. Manfaat dari Selisih Biaya Operasi Kendaraan (BOK)

    Skenario 1 ............................................................................................ Bab 3 13

    Tabel 8.16. Manfaat dari Selisih Biaya Operasi Kendaraan (BOK)

    Skenario 2 ............................................................................................ Bab 8 13

    Tabel 8.17. Manfaat dari Selisih Biaya Operasi Kendaraan (BOK)

    Skenario 3 ............................................................................................ Bab 8 13

    Tabel 8.18. Manfaat dari Selisih Biaya Operasi Kendaraan (BOK)

    Skenario 4 ............................................................................................ Bab 3 13

    Tabel 8.19. Manfaat dari Selisih Biaya Operasi Kendaraan (BOK)

    Skenario 5 ............................................................................................ Bab 8 13

    Tabel 8.20. Manfaat dari Selisih Biaya Operasi Kendaraan (BOK)

    Skenario 6 ............................................................................................ Bab 8 13

    Tabel 8.21. Manfaat dari Selisih Biaya Operasi Kendaraan (BOK)

    Skenario 7 ............................................................................................ Bab 3 13

    Tabel 8.22. Manfaat dari Selisih Biaya Operasi Kendaraan (BOK)

    Skenario 8 ............................................................................................ Bab 8 14

    Tabel 8.23. Manfaat dari Selisih Biaya Operasi Kendaraan (BOK)

    Skenario 9&10 .................................................................................... Bab 8 14

    Tabel 8.24. Manfaat dari Nilai Waktu Kendaraan dari Selisih

    Tundaan Simpang Skenario 1 .......................................................... Bab 8 14

  • Studi Kelayakan Fly Over Jalan Arteri Utara Timur (Paket-7)

    Laporan Akhir

    xiii

    Tabel 8.25. Manfaat dari Nilai Waktu Kendaraan dari Selisih

    Tundaan Simpang Skenario 2 .......................................................... Bab 8 14

    Tabel 8.26. Manfaat dari Nilai Waktu Kendaraan dari Selisih

    Tundaan Simpang Skenario 3 .......................................................... Bab 8 14

    Tabel 8.27. Manfaat dari Nilai Waktu Kendaraan dari Selisih

    Tundaan Simpang Skenario 4 .......................................................... Bab 8 15

    Tabel 8.28. Manfaat dari Nilai Waktu Kendaraan dari Selisih

    Tundaan Simpang Skenario 5 .......................................................... Bab 8 15

    Tabel 8.29. Manfaat dari Nilai Waktu Kendaraan dari Selisih

    Tundaan Simpang Skenario 6 .......................................................... Bab 8 15

    Tabel 8.30. Manfaat dari Nilai Waktu Kendaraan dari Selisih

    Tundaan Simpang Skenario 7 .......................................................... Bab 8 15

    Tabel 8.31. Manfaat dari Nilai Waktu Kendaraan dari Selisih

    Tundaan Simpang Skenario 8 .......................................................... Bab 8 15

    Tabel 8.32. Manfaat dari Nilai Waktu Kendaraan dari Selisih

    Tundaan Simpang Skenario 9 & 10 ................................................. Bab 8 16

    Tabel 8.33. Manfaat dari Nilai Waktu Kendaraan dari Selisih

    Tundaan Ruas selama 10 tahun ....................................................... Bab 8 16

    Tabel 8.34. Perhitungan Nilai Manfaat Skenario 1 ........................................... Bab 8 16

    Tabel 8.35. Perhitungan Nilai Manfaat Skenario 2 ........................................... Bab 8 16

    Tabel 8.36. Perhitungan Nilai Manfaat Skenario 3 ........................................... Bab 8 16

    Tabel 8.37. Perhitungan Nilai Manfaat Skenario 4 ........................................... Bab 8 17

    Tabel 8.38. Perhitungan Nilai Manfaat Skenario 5 ........................................... Bab 8 17

    Tabel 8.39. Perhitungan Nilai Manfaat Skenario 6 ........................................... Bab 8 17

    Tabel 8.40. Perhitungan Nilai Manfaat Skenario 7 ........................................... Bab 8 17

    Tabel 8.41. Perhitungan Nilai Manfaat Skenario 8 ........................................... Bab 8 17

    Tabel 8.42. Perhitungan Nilai Manfaat Skenario 9 & 10 .................................. Bab 8 17

    Tabel 9.1. Analisis Biaya Manfaat Skenario 1 pada Tingkat Diskon 12% ... Bab 9 8

    Tabel 9.2. Analisis Biaya Manfaat Skenario 1 pada Tingkat Diskon 15% ... Bab 9 8

    Tabel 9.3. Analisis Biaya Manfaat Skenario 1 pada Tingkat Diskon 18% ... Bab 9 9

    Tabel 9.4. Analisis Kelayakan Ekonomi Skenario 1 ........................................ Bab 9 9

    Tabel 9.5. Analisis Biaya Manfaat Skenario 2 pada Tingkat Diskon 12% ... Bab 9 10

    Tabel 9.6. Analisis Biaya Manfaat Skenario 2 pada Tingkat Diskon 15% ... Bab 9 10

  • Studi Kelayakan Fly Over Jalan Arteri Utara Timur (Paket-7)

    Laporan Akhir

    xiv

    Tabel 9.7. Analisis Biaya Manfaat Skenario 2 pada Tingkat Diskon 18% ... Bab 9 11

    Tabel 9.8. Analisis Kelayakan Ekonomi Skenario 2 ........................................ Bab 9 11

    Tabel 9.9. Analisis Biaya Manfaat Skenario 3 pada Tingkat Diskon 12% ... Bab 9 12

    Tabel 9.10. Analisis Biaya Manfaat Skenario 3 pada Tingkat Diskon 15% ... Bab 9 12

    Tabel 9.11. Analisis Biaya Manfaat Skenario 3 pada Tingkat Diskon 18% ... Bab 9 13

    Tabel 9.12. Analisis Kelayakan Ekonomi Skenario 3 ........................................ Bab 9 13

    Tabel 9.13. Analisis Biaya Manfaat Skenario 4 pada Tingkat Diskon 12% ... Bab 9 14

    Tabel 9.14. Analisis Biaya Manfaat Skenario 4 pada Tingkat Diskon 15% ... Bab 9 14

    Tabel 9.15. Analisis Biaya Manfaat Skenario 4 pada Tingkat Diskon 18% ... Bab 9 15

    Tabel 9.16. Analisis Kelayakan Ekonomi Skenario 4 ........................................ Bab 9 15

    Tabel 9.17. Analisis Biaya Manfaat Skenario 5 pada Tingkat Diskon 12% ... Bab 9 16

    Tabel 9.18. Analisis Biaya Manfaat Skenario 5 pada Tingkat Diskon 15% ... Bab 9 16

    Tabel 9.19. Analisis Biaya Manfaat Skenario 5 pada Tingkat Diskon 18% ... Bab 9 17

    Tabel 9.20. Analisis Kelayakan Ekonomi Skenario 5 ........................................ Bab 9 17

    Tabel 9.21. Analisis Biaya Manfaat Skenario 5 pada Tingkat Diskon 12% ... Bab 9 18

    Tabel 9.22. Analisis Biaya Manfaat Skenario 5 pada Tingkat Diskon 15% ... Bab 9 18

    Tabel 9.23. Analisis Biaya Manfaat Skenario 5 pada Tingkat Diskon 18% ... Bab 9 19

    Tabel 9.24. Analisis Kelayakan Ekonomi Skenario 6 ........................................ Bab 9 19

    Tabel 9.25. Analisis Biaya Manfaat Skenario 7 pada Tingkat Diskon 12% ... Bab 9 20

    Tabel 9.26. Analisis Biaya Manfaat Skenario 7 pada Tingkat Diskon 15% ... Bab 9 20

    Tabel 9.27. Analisis Biaya Manfaat Skenario 7 pada Tingkat Diskon 18% ... Bab 9 21

    Tabel 9.28. Analisis Kelayakan Ekonomi Skenario 7 ........................................ Bab 9 21

    Tabel 9.29. Analisis Biaya Manfaat Skenario 8 pada Tingkat Diskon 12% ... Bab 9 22

    Tabel 9.30. Analisis Biaya Manfaat Skenario 8 pada Tingkat Diskon 15% ... Bab 9 22

    Tabel 9.31. Analisis Biaya Manfaat Skenario 8 pada Tingkat Diskon 18% ... Bab 9 23

    Tabel 9.32. Analisis Kelayakan Ekonomi Skenario 8 ........................................ Bab 9 23

    Tabel 9.33. Analisis Biaya Manfaat Skenario 9 pada Tingkat Diskon 12% ... Bab 9 24

    Tabel 9.34. Analisis Biaya Manfaat Skenario 9 pada Tingkat Diskon 15% ... Bab 9 24

    Tabel 9.35. Analisis Biaya Manfaat Skenario 9 pada Tingkat Diskon 18% ... Bab 9 25

    Tabel 9.36. Analisis Kelayakan Ekonomi Skenario 9 ........................................ Bab 9 25

    Tabel 9.37. Analisis Biaya Manfaat Skenario 10 pada Tingkat Diskon 12% . Bab 9 26

    Tabel 9.38. Analisis Biaya Manfaat Skenario 10pada Tingkat Diskon 15% .. Bab 9 26

    Tabel 9.39. Analisis Biaya Manfaat Skenario 10 pada Tingkat Diskon 18% . Bab 9 27

  • Studi Kelayakan Fly Over Jalan Arteri Utara Timur (Paket-7)

    Laporan Akhir

    xv

    Tabel 9.40. Analisis Kelayakan Ekonomi Skenario 10 ...................................... Bab 9 27

  • Studi Kelayakan Fly Over Jalan Arteri Utara Timur (Paket-7)

    Laporan Akhir

    xvi

    DAFTAR GAMBAR

    Gambar 1.1. Lokasi Studi ..................................................................................... Bab 1 3

    Gambar 3.1. Pola Pikir Penanganan Simpang................................................... Bab 3 2

    Gambar 3.2. Grafik Tipe Simpang yang Sesuai Berdasarkan Variasi Arus

    Lalulintas ......................................................................................... Bab 3 3

    Gambar 3.3. Diagram Alir Tahapan Studi......................................................... Bab 3 4

    Gambar 4.1. Persilangan Tidak Sebidang Bentuk Terompet (a) .................. Bab 4 5

    Gambar 4.2. Persilangan Tidak Sebidang Bentuk Terompet (b) .................. Bab 4 5

    Gambar 4.3. Persilangan Tidak Sebidang Bentuk Lain ................................. Bab 4 6

    Gambar 4.4. Pengembangan Menjadi Simpang Empat ................................. Bab 4 6

    Gambar 4.5. Persilangan Tak Sebidang Bentuk Diamond ............................ Bab 4 7

    Gambar 4.6. Persilangan Tak Sebidang Bentuk Bundaran ........................... Bab 4 7

    Gambar 4.7. Persilangan Tak Sebidang Bentuk Semanggi ........................... Bab 4 8

    Gambar 4.8. Persilangan Tak Sebidang Bentuk Semanggi yang

    Dimodifikasi ................................................................................... Bab 4 8

    Gambar 4.9. Persilangan Tak Sebidang Jalan Luar Kota Bentuk Semanggi

    Simpang Gejayan ........................................................................ Bab 4 9

    Gambar 4.10. Persilangan Tak Sebidang Jalan Perkotaan Bentuk Semanggi

    Simpang Gejayan ........................................................................ Bab 4 10

    Gambar 4.11. Persilangan Tak Sebidang Jalan Luar Kota Bentuk Semanggi

    Simpang Kentungan .................................................................... Bab 4 11

    Gambar 4.12. Persilangan Tak Sebidang Jalan Perkotaan Bentuk Semanggi

    Simpang Kentungan .................................................................... Bab 4 12

    Gambar 4.13. Persilangan Tak Sebidang Jalan Luar Kota Bentuk Semanggi

    Simpang Jombor ........................................................................... Bab 4 13

    Gambar 4.14. Persilangan Tak Sebidang Jalan Perkotaan Bentuk Semanggi

    Simpang Jombor .......................................................................... Bab 4 14

    Gambar 4.15. Persilangan Tak Sebidang Simpang UPN ................................. Bab 4 15

    Gambar 4.16. Persilangan Tak Sebidang Simpang Gejayan ........................... Bab 4 16

    Gambar 4.17. Persilangan Tak Sebidang Simpang Kentungan ...................... Bab 4 17

  • Studi Kelayakan Fly Over Jalan Arteri Utara Timur (Paket-7)

    Laporan Akhir

    xvii

    Gambar 4.18. Persilangan Tak Sebidang Simpang Jombor ............................ Bab 4 18

    Gambar 4.19. Persilangan Tak Sebidang Alternatif 1 Simpang Jombor ...... Bab 4 19

    Gambar 4.20. Persilangan Tak Sebidang Simpang Alternatif 2 Jombor ....... Bab 4 20

    Gambar 4.21. Persilangan Tak Sebidang Simpang Monjali ............................ Bab 4 21

    Gambar 4.22. Elevated Road di Jalan Arteri Utara Timur .............................. Bab 4 22

    Gambar 5.1. Simpang Jombor ........................................................................... Bab 5 5

    Gambar 5.2. Simpang Monjali ........................................................................... Bab 5 7

    Gambar 5.3. Simpang Kentungan .................................................................... Bab 5 9

    Gambar 5.4. Simpang Gejayan .......................................................................... Bab 5 11

    Gambar 5.5. Simpang UPN ............................................................................... Bab 5 13

    Gambar 5.6. Simpang Maguwoharjo ............................................................... Bab 5 15

    Gambar 6.1. Zona Asal Tujuan dalam Area Studi pada jam sibuk .......... Bab 6 3

    Gambar 6.2. Perbandingan Arus Lapangan dan Arus Model dengan

    Uji R2 ................................................................................................ Bab 6 5

    Gambar 6.3. Arus Lalulintas Tahun 2008, 2013, dan 2018 ................... Bab 6 11

    Gambar 6.4. Perbandingan Kinerja Jaringan Jalan pada Tahun 2013 ......... Bab 6 14

    Gambar 6.5. Perbandingan Kinerja Jaringan Jalan pada Tahun 2018 ......... Bab 6 15

    Gambar 8.1. Analisis BOK ................................................................................. Bab 8 3

    Gambar 9.1. Bagan Alir Analisis Biaya Manfaat ............................................ Bab 9 5

    Gambar 9.2. Nilai Economic Internal rate of Return Skenario 1 ...................... Bab 9 9

    Gambar 9.3. Nilai Economic Internal rate of Return Skenario 2 ...................... Bab 9 11

    Gambar 9.4. Nilai Economic Internal rate of Return Skenario 3 ...................... Bab 9 13

    Gambar 9.5. Nilai Economic Internal rate of Return Skenario 4 ...................... Bab 9 15

    Gambar 9.6. Nilai Economic Internal rate of Return Skenario 5 ...................... Bab 9 17

    Gambar 9.7. Nilai Economic Internal rate of Return Skenario 6 ...................... Bab 9 19

    Gambar 9.8. Nilai Economic Internal rate of Return Skenario 7 ...................... Bab 9 21

    Gambar 9.9. Nilai Economic Internal rate of Return Skenario 8 ...................... Bab 9 23

    Gambar 9.10. Nilai Economic Internal rate of Return Skenario 9 ...................... Bab 9 25

    Gambar 9.11. Nilai Economic Internal rate of Return Skenario 10 .................... Bab 9 27

  • Studi Kelayakan Fly Over Jalan Arteri Utara Timur (Paket-7)

    Laporan Akhir

    xviii

    DAFTAR LAMPIRAN

    Lampiran 1 Hasil Hitungan KAJI

    Lampiran 2 Hasil Hitungan BOK

    Lampiran 3 Output Program SATURN

    Lampiran 4 Dokumen UKL-UPL

  • Studi Kelayakan Fly Over Jalan Arteri Utara Timur (Paket-7)

    Laporan Akhir

    Bab 1 -

    1

    Bab 1 PENDAHULUAN

    1.1. LATAR BELAKANG

    Program pembangunan yang dilaksanakan selama ini telah berhasil meningkatkan

    taraf hidup penduduk. Konsekuensi atas keberhasilan tersebut terhadap pelayanan jasa

    transportasi jalan raya adalah meningkatnya permintaan penyediaan prasarana

    transportasi yang semakin luas dengan kualitas yang semakin meningkat pula.

    Perkembangan penggunaan tanah dan akses pada sisi kanan-kiri sepanjang ring

    road D.I. Yogyakarta belum sesuai dengan harapan, padahal perkembangan yang

    terlanjur tak terkendali akan menimbulkan masalah makin besar dan menjadi amat mahal

    untuk menata ulang. Akibat pertumbuhan penggunaan lahan pada sisi kanan kiri jalan

    (terutama ring road utara timur) yang diikuti dengan munculnya jalan-jalan akses ke ring

    road yang tidak terkendali telah menyebabkan gangguan terhadap fungsi ring road

    sebagai jalan arteri, sehingga menyebabkan terjadinya kemacetan arus lalu lintas pada

    lokasi-lokasi tertentu.

    Kemacetan yang terjadi di ring road ini terjadi pada beberapa penggal ruas,

    seperti pada fasilitas putaran (U-turn) serta di beberapa pertemuan sebidang (simpang).

    Di samping perubahan penggunaan lahan, fungsi ring road ternyata juga telah banyak di

    akses oleh lalu lintas lokal. Hal inilah yang telah menyebabkan beberapa kemacetan dan

    kesemerawutan serta gangguan lalu lintas menerus, yang berakibat pada berkurangnya

    kecepatan yang tidak sesuai kecepatan rencana, berkurangnya tingkat pelayanan, hingga

    berubahnya karakteristik ring road sebagai jalur arteri.

    1.2. MAKSUD DAN TUJUAN

    Untuk mengantisipasi perkembangan di masa mendatang, perlu direncanakan

    pembangunan fly over sebagai alternative untuk memperlancar arus lalu lintas menerus

    di simpang-simpang ring road tersebut dengan jalan-jalan yang ada seperti jalan

  • Studi Kelayakan Fly Over Jalan Arteri Utara Timur (Paket-7)

    Laporan Akhir

    Bab 1 -

    2

    Magelang, Monjali, Kaliurang, Gejayan/ Condong Catur serta untuk mengurangi bahaya

    U-turn di simpang UPN/ Seturan.

    Penanganan di atas membutuhkan analisis yang detail yang berhubungan dengan

    kelayakan (feasibility) yang akan dituangkan pada pekerjaan ini.

    1.3. LINGKUP KEGIATAN

    Tahapan kegiatan yang dilakukan dalam penyusunan studi kelayakan ini adalah :

    a. Pekerjaan Persiapan.

    b. Pengumpulan Data Sekunder

    c. Review Data.

    d. Survai Pendahuluan

    e. Survai Data Primer

    f. Pengolahan dan Analisis Data .

    g. Analisis Kelayakan

    h. Pembuatan Laporan

    1.4. MANFAAT YANG DIHARAPKAN

    Berbagai hasil studi yang diharapkan dari pekerjaan Studi Kelayakan Fly Over

    Jalan Arteri Utara Timur antara lain :

    a. Penentuan lokasi fly over.

    b. Perhitungan manfaat proyek.

    c. Estimasi biaya pembangunan fly over.

    d. Kajian kelayakan proyek.

    1.5. LOKASI KEGIATAN

    Lokasi pekerjaan Studi Kelayakan Fly Over Jalan Arteri Utara Timur berlokasi di

    Provinsi D.I Yogyakarta, seperti terdapat pada Gambar 1.1.

  • K

    PULO

    WE

    ATU

    K

    PULO

    WE

    ATU

    R

    KEKA

    LIUAN

    G

    R

    KEKA

    LIUAN

    G

    AJL. RTERI UTARAAJL. RTERI UTARA

    Jl La A p. ksda disuci toJl La A p. ksda disuci to

    J r p

    u harjol. U i S moJ r p u harjol. U i S moJl. Je u rman. S di nJl. Je u rman. S di n

    Jl. P. Di on go op e rJl. P. Di on go op e rJ

    K a M jol. y i

    oJ

    K a M jol. y i

    o

    Jl.

    Mge

    lang

    aJl.

    Mge

    lang

    a

    Jl.

    AM

    Sanga

    jiJl.

    AM

    Sanga

    ji

    C

    annt

    Jl..S

    imju

    ak

    C

    annt

    Jl..S

    imju

    ak

    Jl.

    HOS

    Cokr

    oam

    inot

    o

    Jl.

    HOS

    Cokr

    oam

    inot

    o

    Jl. RE ar M tadinata

    Jl. RE ar M tadinata

    Jl.

    Kapt

    .

    Tede

    ann

    Jl.

    Kapt

    .

    Tede

    ann

    l.gi

    sJ

    Buan

    l.gi

    sJ

    Buan

    Jl. S. Jeroni

    Jl. S. Jeroni

    HaJl. MT ryonoHaJl.

    MT ryono

    yJl. Suto oyJl. Suto oJl. Kol. Sugiyono

    Jl. Kol. Sugiyono

    Jl. M. Supen o

    Jl. M. Supen o Jl. Ngeks gondo

    iJl. Ngeks gondo i

    Jl.ed

    o

    kun

    Gng

    ingJl.

    edo

    kun

    Gng

    ing

    KE

    SAR

    WONOI

    KE

    SAR

    WONOI

    LKE SO OLKE SO O

    K G DEA

    E ON

    K G DEA

    E ON

    KE

    ANT

    LB

    UKE

    ANT

    LB

    U

    PR

    NG

    TRT

    S

    KE

    AA

    II

    PR

    NG

    TRT

    S

    KE

    AA

    II

    rJl

    . Pam

    uka

    rJl

    . Pam

    uka

    JL. RTERI LA NA SE TAJL. RTERI LA NA SE TA

    KE WATESKE WATES

    KE

    MAK

    A

    IMG

    IRI

    MO

    KE

    MAK

    A

    IMG

    IRI

    MO

    Jl. Patang

    PuluhanJl.

    Patang Puluhan

    Jl. WatesJl. Wates

    Jl.

    KH

    Wa

    khd

    Ha

    syim

    iJl.

    KH

    Wa

    khd

    Ha

    syim

    i

    J K Al. H . Dahlan

    J K Al. H . DahlanJl. P. S n p tie o aJl. P. S n p tie o a Jl. S Agung Jl. S Agung Jl.

    KusumanegaraJl. Kusumanegara

    Jl.Ai

    d

    Tu

    Sud

    rso

    o

    pa

    ta

    nJl.

    Aid

    Tu

    Sud

    rso

    o

    pa

    ta

    n

    cJl. Wono aturcJl. Wono atur

    Jl. KarangsariJl. Karangsari

    Jl

    Imog

    ri.

    iJl

    Imog

    ri.

    i

    Jl. e

    G uT gal endJl.

    e G uT gal end

    .Jl

    Kem

    asa

    n.Jl

    Kem

    asa

    nJl.

    Karang Lo

    Jl. Karang

    Lo

    Jl

    Sisi

    nga

    an

    ara

    ja.

    Mg

    Jl

    Sisi

    nga

    an

    ara

    ja.

    Mg

    Jl.

    Para

    ngt

    ritis

    Jl.

    Para

    ngt

    ritis

    Jl.

    Bantu

    lJl.

    Bantu

    l

    eJl. V teraneJl. V teran

    STUDI KELAYAKAN FLY OVERJALAN ARTERI UTARA TIMURPROPINSI D.I. YOGYAKARTA

    STUDI KELAYAKAN FLY OVERJALAN ARTERI UTARA TIMURPROPINSI D.I. YOGYAKARTA

    LOKASI STUDIPERKOTAAN YOGYAKARTA

    PROPINSI DAERAH ISTIMEWA YOGYAKARTA

    LOKASI STUDIPERKOTAAN YOGYAKARTA

    PROPINSI DAERAH ISTIMEWA YOGYAKARTA

    L E G E N D A :L E G E N D A :

    : JALAN NASIONAL ARTERI : JALAN NASIONAL ARTERI

    : JALAN PROPINSI KOLEKTOR : JALAN PROPINSI KOLEKTOR

    : JALAN KABUPATEN KOLEKTOR: JALAN KABUPATEN KOLEKTOR

    J.A

    TR

    LR

    EI U

    TARA

    BARA

    T

    J.A

    TR

    LR

    EI U

    TARA

    BARA

    T

    UU

    002 K1002 K1

    2K00

    22 K00

    2

    3 K1003 K100 03 K20 03 K20

    003 K3003 K30

    10 4 K0 10 4 K4

    200

    K42

    00

    K

    00 4 K300 4 K3

    K001

    5 K0

    015

    0

    K1150

    K115

    12

    0 5

    K1

    20 5

    K

    015 K3015 K3 0 51

    K40 51 K4

    10 5 K510 5 K5

    0 5 61 K 0 5 61 K

    0 5 71 K0 5 71 K

    501 K8501 K8 015 K 9015 K 9

    028 1028 1

    03 1803 18

    038 2

    038 2

    KEC. GAMPINGKEC. GAMPING

    EC. KAK SIHANEC. KAK SIHAN

    KEC. SEWONKEC. SEWON

    KEC. BANGUNTAPANKEC. BANGUNTAPANKEC. BANGUNTAPANKEC. BANGUNTAPAN

    GA RNO MBA GA RNO MBA

    UD G MBARJ UL AUD G MBARJ UL A

    AMBG AR 1.1AMBG AR 1.1 BAB 1 - 3BAB 1 - 3

    HALAMANHALAMAN

    E . D PK C E OKE . D PK C E OK

    EC. MLA IK TEC. MLA IK T

    : JALAN AGLOMERASI: JALAN AGLOMERASI

    : BATAS WILAYAH: BATAS WILAYAH

    KE

    MAG

    ELAN

    GKE

    MAG

    ELAN

    G

    jJl.

    Geay

    anj

    Jl.

    Geay

    an

    J De a

    jol. m k I

    J De a

    jol. m k I

    JlM

    dk s

    m.

    au

    io

    JlM

    dk s

    m.

    au

    io

    Jl.

    Kap

    yak

    rJl.

    Kap

    yak

    r

    Jl. Per. Kemerdekaan

    Jl. Per. Kemerdekaan

    Jl R

    jowan

    gun

    .e

    inJl

    Rjow

    angu

    n.

    ein

    Simpang Jombor

    Simpang UPN

    Simpang Maguwo

    Simpang Monjali

    Simpang Jl. Kaliurang

    Simpang Condong Catur/ Gejayan

    DEPARTEMEN PEKERJAAN UMUMDIREKTORAT JENDERAL BINA MARGASATKER NVT PERENCANAAN DAN PENGAWASAN JALAN DAN JEMBATANP R O P I N S I D A E R A H I S T I M E W A Y O G Y A K A R T AJalan Ring Road Utara Maguwoharjo, Depok, Sleman, Yogyakarta - Telp (0274)488583 - Kode Pos 55282

  • Studi Kelayakan Fly Over Jalan Arteri Utara Timur (Paket-7)

    Laporan Akhir Bab 2 -

    1

    Bab 2 GAMBARAN WILAYAH STUDI

    2.1. DAERAH ISTIMEWA YOGYAKARTA

    2.1.1. Letak Geografis Dan Topografis

    Secara geografis letak Provinsi Daerah Istimewa Yogyakarta terletak di pulau Jawa

    bagian tengah, dibatasi Lautan Indonesia di bagian selatan, sementara di bagian timur

    laut, tenggara, barat, dan barat laut dibatasi oleh wilayah Provinsi Jawa Tengah yang

    meliputi:

    a. Sebelah timur laut : Kabupaten Klaten

    b. Sebelah tenggara : Kabupaten Wonogiri

    c. Sebelah barat : Kabupaten Purworejo

    d. Sebelah barat laut : Kabupaten Magelang

    Posisi Daerah Istimewa Yogyakarta terletak antara 7.338.12 lintang selatan dan 110.00-110.50 bujur timur, dengan luas wilayah seluruhnya meliputi 3.185,80 km2.

    Daerah Istimewa Yogyakarta terdiri dari:

    a. Kabupaten Kulonprogo, luas wilayah 586,27 km (18,40%)

    b. Kabupaten Bantul, luas wilayah 506,85 km (15,91%)

    c. Kabupaten Gunungkidul, luas wilayah 1.485,36 km (46,62%)

    d. Kabupaten Sleman, luas wilayah 574,82 km (18,04%)

    e. Kota Yogyakarta, luas wilayah 32,50 km (1,02%)

    Sedangkan berdasarkan satuan fisiografis, wilayah DIY terdiri atas:

    a. Pegunungan selatan, luas 1.656,25 km, ketinggian 150700 m.

    b. Gunung Berapi Merapi, luas 582,81 km, ketinggian 802.911 m.

    c. Dataran rendah antara Pegunungan Selatan dan Pegunungan Kulonprogo,

    luas 215,62 km, ketinggian 080 m.

    d. Pegunungan Kulonprogo dan dataran rendah selatan, luas 706,25 km,

    ketinggian 0572 m.

  • Studi Kelayakan Fly Over Jalan Arteri Utara Timur (Paket-7)

    Laporan Akhir Bab 2 -

    2

    2.1.2. Klimatologi dan Hidrologi

    a. Curah hujan

    Curah hujan di DIY berkisar antara 7 mm 380 mm yang dipengaruhi oleh musim

    kemarau dan musim hujan. Dari angka curah hujan tersebut dapat digolongkan bahwa

    daerah kota ini termasuk dalam kategori daerah basah sedang, yang masih dapat

    mendukung bagi penyediaan air minum maupun sumber daya air tanah lainnya.

    b. Temperatur, Kelembaban dan Angin

    Menurut catatan Stasiun Meteorologi Bandara Adisucipto, suhu udara rata-rata di

    Yogyakarta pada tahun 2006 menunjukkan angka 26,34C dengan suhu maksimum 34,60C, suhu minimum 18,00C. Kelembaban udara tercatat 3495%, tekanan udara antara 1.005,91.015,7 mb, arah angin antara 195205 derajat dan kecepatan angin berkisar

    0,120 knot.

    2.1.3. Kondisi Geologi

    Keadaan morfologi geologi di DIY terdiri atas:

    a. 35,94% merupakan jenis tanah lithosol,

    b. 27,42% merupakan jenis tanah regosol,

    c. 11,94% merupakan jenis tanah lathosol,

    d. 10,45% merupakan jenis tanah grumusol,

    e. 10,27% merupakan jenis tanah mediteran,

    f. 2,24% merupakan jenis tanah alluvial,

    g. 1,74% merupakan jenis tanah rensina.

    2.1.4. Wilayah Administratif

    Daerah Istimewa Yogyakarta memiliki 5 (lima) wilayah administratif. Perincian

    wilayah administratif di DIY berdasarkan luas dapat dilihat pada tabel berikut ini.

  • Studi Kelayakan Fly Over Jalan Arteri Utara Timur (Paket-7)

    Laporan Akhir Bab 2 -

    3

    Tabel 2.1. Ibukota dan Luas Wilayah di Daerah Administratif Provinsi DIY Tahun 2006

    Kabupaten/Kota Ibukota Luas Wilayah

    (Km) Persentase Luas

    (%)

    Kulonprogo Wates 586,27 18,40

    Bantul Bantul 506,85 15,91

    Gunungkidul Wonosari 1.485,36 46,62

    Sleman Sleman 574,82 18,04

    Yogyakarta Yogyakarta 32,50 1,02

    Provinsi DIY Yogyakarta 3.185,80 100,00 (Sumber: DIY dalam Angka 2006, BPS DIY 2006)

    Berdasar catatan BPS Provinsi DIY tahun 2006, Daerah Istimewa Yogyakarta

    memiliki 78 kecamatan yang tersebar dalam 5 kabupaten/kota, yakni 12 kecamatan di

    Kabupaten Kulonprogo, 17 kecamatan di Kabupaten Bantul, 18 kecamatan di Kabupaten

    Gunungkidul, 17 kecamatan di Kabupaten Sleman, dan 14 kecamatan di Kota Yogyakarta.

    2.1.5. Perkembangan dan Penyebaran Penduduk

    Jumlah penduduk di DI Yogyakarta, berdasarkan hasil Susenas akhir tahun 2006,

    adalah 3.281.800 jiwa, dengan persentase perempuan sejumlah 50,78% dan laki-laki

    49,22%. Menurut daerah, presentase penduduk kota mencapai 59,11 persen dan

    penduduk desa mencapai 40,89 persen, sehingga dengan luas wilayah 3.185,80 km2,

    kepadatan penduduk di DIY sebesar 1.030,13 jiwa per km2. Adapun pertumbuhan

    penduduk pada tahun 2006 adalah 1,88%.

    Perincian jumlah penduduk menurut Kabupaten/Kota di Provinsi DIY dapat

    dilihat pada tabel berikut ini.

    Tabel 2.2. Jumlah Penduduk Menurut Kabupaten/Kota di DI Yogyakarta Tahun 2006

    No. Kabupaten/Kota Luas Wilayah

    (Km) Penduduk

    (Jiwa) Kepadatan

    jiwa per km2

    1 Kulonprogo 586,27 386.686 659,57

    2 Bantul 506,85 823.734 1.625,20

    3 Gunungkidul 1.485,36 695.748 468,40

    4 Sleman 574,82 955.124 1.661,61

    5 Kota Yogyakarta 32,50 420.508 12.938,71

    Jumlah 3.185,80 3.281.800 1.030,13 (Sumber: DIY dalam Angka 2006, BPS DIY 2006)

  • Studi Kelayakan Fly Over Jalan Arteri Utara Timur (Paket-7)

    Laporan Akhir Bab 2 -

    4

    2.1.6. Sistem Perhubungan

    a. Jalan Raya dan Angkutan Darat

    Di wilayah Provinsi D.I. Yogyakarta terdapat jaringan jalan yang terdiri dari jalan

    arteri, jalan kolektor, dan jalan lokal, serta sejumlah jalan kawasan permukiman yang

    belum terinventarisasi, terutama untuk kawasan permukiman baru.

    Jalan raya merupakan sarana utama lalulintas yang sangat diperlukan untuk

    transportasi dan kelancaran roda perekonomian, maka kondisi dan penggunaannya harus

    diperhatikan. Tahun 2006, dari 4.840,32 km panjang jalan di D.I. Yogyakarta. Panjang

    jalan nasional sekitar 3,49 persen, panjang jalan Provinsi 14,26 persen, dan panjang jalan

    kabupaten/kota mencapai 82,25 persen. Dengan jenis permukaaan 72,16 persen aspal,

    15,10 persen kerikil, dan sisanya 12,74 persen tanah.

    Dilihat menurut kondisi jalan, sekitar 36,78 persen dalam kondisi baik, 38,18

    persen dalam kondisi sedang, 24,46 persen dalam kondisi rusak dan 0,58 persen dalam

    kondisi rusak berat. Kondisi jalan yang rusak dan rusak berat sebagian besar terjadi pada

    jalan-jalan kabupaten/kota.

    Jumlah kendaraan bermotor yang terdaftar di DI Yogyakarta pada tahun 2006

    tercatat sebanyak 976.137 unit (naik 11,19 persen dari tahun 2004) yang terdiri dari 8,47

    persen mobil penumpang, mobil beban sebanyak 3,65 persen, 1,50 persen bus dan 86,37

    persen sepeda motor atau tercatat 843.077 unit.

    Sarana transportasi kereta api menjadi alternatif pilihan utama bagi pemakai jasa

    angkutan karena sifatnya yang murah. Namun karena ada kebijakan penurunan harga

    tiket yang cukup besar dengan fasilitas udara untuk beberapa tujuan penerbangan maka

    pemakai sarana kereta api menjadi berkurang. Setelah mengalami penurunan jumlah

    penumpang sekitar 7,32 persen pada tahun 2004, tahun 2006 terjadi penurunan kembali

    sebesar 2,76 persen atau tercatat 1.599.063 penumpang untuk berbagai tujuan. Sedangkan

    jumlah angkutan barang turun 92,39 persen atau sebesar 5.450 kg.

    Kiriman mengalami penurunan sebesar 33,57 persen atau tercatat sebesar 475.169

    kg, sedangkan barang lainnya/paket pos mengalami kenaikan sebesar 2,87 persen atau

    tercatat sebesar 984.787 kg.

    Pendapatan PT. Kereta Api DAOP IV Provinsi DI Yogyakarta tahun 2006

    mengalami peningkatan 12,37 persen atau tercatat 134,32 milyar yang sebagian besar

  • Studi Kelayakan Fly Over Jalan Arteri Utara Timur (Paket-7)

    Laporan Akhir Bab 2 -

    5

    bersumber dari penjualan tiket penumpang sekitar 64,31 persen, pengiriman barang

    sebesar 33,19 persen dan jasa lainnya sebesar 2,50 persen.

    b. Angkutan Udara

    Arus transportasi udara mengalami penurunan terus menerus sejak 1996, namun

    mulai tahun 2000 mengalami kenaikan.

    Tahun 2006, jumlah pesawat datang di Bandara Adisucipto tercatat 12.981 kali,

    turun 2,33 persen dibanding tahun sebelumnya. Adapun pesawat berangkat tercatat

    sebanyak 12.980 kali atau turun sekitar 2,31 persen dari tahun sebelumnya yang sebanyak

    13.287 kali.

    Jumlah penumpang datang mengalami kenaikan dari 1.186.464 orang pada tahun

    2004 menjadi 1.253.213 orang pada tahun 2006 atau naik 5,63 persen. Demikian pula

    penumpang yang berangkat tercatat 1.235.165 orang atau naik sekitar 6,33 persen dari

    tahun sebelumnya. Sedangkan untuk penumpang yang transit mengalami kenaikan

    sebesar 14,38 persen atau tercatat 60.884 penumpang.

    Volume barang dan bagasi yang dimuat melalui angkutan udara masing-masing

    mengalami kenaikan sebesar 50,96 persen dan 9,68 persen, sedangkan yang dibongkar

    naik sebesar 18,09 persen dan 11,85 persen. Untuk paket pos, volume muat dan bongkar

    masing-masing naik sebesar 26,44 persen dan 16,31 persen.

    Perincian masing-masing panjang jalan, kondisi jalan, jumlah kendaraan, terminal

    dan jumlah barang keluar masuk di masing-masing wilayah dapat dilihat pada tabel-

    tabel berikut ini.

  • Studi Kelayakan Fly Over Jalan Arteri Utara Timur (Paket-7)

    Laporan Akhir Bab 2 -

    6

    Tabel 2.3. Panjang Jalan Nasional menurut Keadaan Jalan dan Kabupaten/Kota di Provinsi D.I. Yogyakarta Tahun 2006

    Kabupaten / Kota (km)

    Keadaan Jalan Kulon Progo

    Bantul Gunung

    Kidul Sleman

    Yogya- karta

    Provinsi DIY

    Jenis Permukaan

    1 Diaspal 28,570 30,580 56,110 53,550 - 168,81

    2 Kerikil - - - - - -

    3 Tanah - - - - - -

    4 Tidak Terinci - - - - - -

    Total 28,570 30,580 56,110 53,550 - 168,81

    Kondisi Jalan

    1 Baik 10,450 3,200 7,110 - - 20,760

    2 Sedang 15,920 17,350 29,400 - - 62,670

    3 Rusak 2,200 10,030 19,600 48,100 - 79,930

    4 Tidak Terinci - - - 4,540 - 5,450

    Total 28,570 30,580 56,110 53,550 - 168,81 (Sumber: DIY dalam Angka 2006, BPS DIY 2006)

  • Studi Kelayakan Fly Over Jalan Arteri Utara Timur (Paket-7)

    Laporan Akhir Bab 2 -

    7

    Tabel 2.4. Panjang Jalan Provinsi menurut Keadaan Jalan dan Kabupaten/Kota di Provinsi D.I. Yogyakarta Tahun 2006

    Kabupaten / Kota (km)

    Keadaan Jalan Kulon Progo

    Bantul Gunung

    Kidul Sleman

    Yogya- karta

    Provinsi DIY

    Jenis Permukaan

    1 Diaspal 159,900 136,050 275,910 118,390 - 690,250

    2 Kerikil - - - - - -

    3 Tanah - - - - - -

    4 Tidak Terinci - - - - - -

    Total 159,900 136,050 275,910 118,390 - 690,250

    Kondisi Jalan

    1 Baik 62,650 55,380 126,300 50,180 - 394,030

    2 Sedang 56,980 38,960 88,190 49,240 - 255,350

    3 Rusak 32,270 36,210 55,620 15,360 - 40,870

    4 Rusak Berat 8,000 5,500 5,800 3,610 - -

    5 Tidak Terinci - - - - - -

    Total 159,900 136,050 275,910 118,390 - 690,250 (Sumber: DIY dalam Angka 2006, BPS DIY 2006)

  • Studi Kelayakan Fly Over Jalan Arteri Utara Timur (Paket-7)

    Laporan Akhir Bab 2 -

    8

    Tabel 2.5. Panjang Jalan Kabupaten/Kota menurut Keadaan Jalan dan Kabupaten/Kota di Provinsi D.I. Yogyakarta Tahun 2006

    Kabupaten / Kota (km)

    Keadaan Jalan Kulon Progo

    Bantul Gunung

    Kidul Sleman

    Yogya- karta

    Provinsi DIY

    Jenis Permukaan

    1 Diaspal 492,33 589,78 483,24 851,08 217,37 2.633,79

    2 Kerikil 248,53 98,05 343,72 17,60 22,87 730,77

    3 Tanah 183,05 213,20 4,00 216,45 - 616,70

    4 Tidak Terinci - - - - - -

    Total 923,903 901,030 830,960 1.085,130 240,240 3.981,26

    Kondisi Jalan

    1 Baik 378,56 305,28 303,45 372,90 104,67 1.464,86

    2 Sedang 406,38 304,65 297,41 440,50 102,83 1.551,77

    3 Rusak 126,97 231,75 160,75 252,90 32,73 805,10

    4 Rusak Berat 12,00 59,35 69,35 18,83 - 159,53

    5 Tidak Terinci - - - - - -

    Total 923,903 901,030 830,960 1.085,130 240,240 3.981,26 (Sumber: DIY dalam Angka 2006, BPS DIY 2006)

  • Studi Kelayakan Fly Over Jalan Arteri Utara Timur (Paket-7)

    Laporan Akhir Bab 2 -

    9

    Tabel 2.6. Jumlah Kendaraan Bermotor yang Terdaftar menurut Jenisnya di Provinsi D.I. Yogyakarta Tahun 2006

    Tidak umum Umum Jenis Kendaraan

    Pemerintah Swasta Pemerintah Swasta Jumlah

    Mobil Penumpang

    1. Sedan

    2. Jeep

    3. Station Wagon

    4. Subusban

    5. Combi

    6. Mini Cap

    7. Kend. Bermotor Roda Tiga

    8. Lain-lain

    3.125

    383

    1.106

    1.636

    -

    -

    -

    -

    -

    77.938

    26.878

    9.138

    41.922

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    1.642

    764

    -

    878

    -

    -

    -

    -

    -

    82.705

    28.025

    10.244

    44.436

    -

    -

    -

    -

    -

    Mobil Beban

    1. Truk Barang

    2. Truk Container

    3. Truk Trailer

    4. Truk Derek

    5. Truk Tank BBM Air

    6. Truk Pemadam Api

    7. Truk Traktor

    8. Pick Up

    9. Ambulans

    10. Mobil Jenazah

    11. Lain-lain

    1.360

    577

    4

    -

    3

    42

    10

    1

    482

    237

    2

    2

    31.958

    8.915

    24

    -

    -

    156

    2

    38

    22.690

    130

    -

    3

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    2.352

    1.352

    -

    -

    -

    -

    -

    -

    1.000

    -

    -

    -

    35.670

    10.844

    28

    -

    3

    198

    12

    39

    24.172

    367

    2

    5

    (Sumber: DIY dalam Angka 2006, BPS DIY 2006)

  • Studi Kelayakan Fly Over Jalan Arteri Utara Timur (Paket-7)

    Laporan Akhir Bab 2 -

    10

    Tabel 2.7. Jumlah Kendaraan Bermotor yang Terdaftar menurut Kabupaten di Provinsi D.I. Yogyakarta Tahun 2006

    Tidak umum Umum Kabupaten Mobil

    Penumpang Mobil Beban

    Bus Sepeda Motor

    Jumlah

    1. Kulon Progo 2. Bantul 3. Gunung Kidul 4. Sleman 5. Yogyakarta

    3.070 9.934 3.722

    33.910 32.069

    2.411 7.729 3.570 9.731

    12.679

    432 3.966 708

    5.151 4.428

    61.474 194.456 66.497

    294.236 226.414

    67.387 215.635 74.497

    343.028 275.590

    Provinsi DI Yogyakarta 82.705 35.670 14.685 843.977 976.137

    (Sumber: DIY dalam Angka 2006, BPS DIY 2006)

    Tabel 2.8. Arus Lalulintas Penumpang dan Barang Dalam Negeri melalui Bandar Udara Adisucipto per Bulan di Provinsi D.I. Yogyakarta Tahun 2006

    Penumpang Barang (kg) Bulan

    Datang Berangkat Transit Bongkar

    1. Januari

    2. Februari

    3. Maret

    4. April

    5. Mei

    6. Juni

    7. Juli

    8. Agustus

    9. September

    10. Oktober

    11. Nopember

    12. Desember

    104.727

    90.271

    98.708

    96.547

    95.785

    97.718

    126.609

    112.988

    109.618

    83.229

    106.386

    104.383

    106.426

    89.996

    96.691

    95.434

    96.628

    94.845

    126.014

    111.700

    108.354

    78.678

    105.633

    104.572

    5.061

    4.065

    5.298

    4.908

    5.533

    5.900

    7.061

    5.706

    7.791

    5.837

    6.344

    6.180

    232.216

    241.952

    270.342

    291.263

    270.717

    313.423

    364.513

    327.107

    299.844

    335.037

    203.692

    301.003

    Jumlah 1.226.969 1.214.971 69.884 3.451.109

    (Sumber: DIY dalam Angka 2006, BPS DIY 2006)

  • Studi Kelayakan Fly Over Jalan Arteri Utara Timur (Paket-7)

    Laporan Akhir Bab 2 -

    11

    2.2. PROGRAM PEMBANGUNAN DAERAH

    2.2.1. Visi dan Misi Pembangunan Daerah

    1. Visi Pembangunan Daerah

    Mewujudkan pembangunan regional sebagai wahana menuju status otonomi yang

    maju, dimana kemajuan tersebut berbasis pada faktor-faktor semangat kejuangan,

    resistensi budaya, sikap kesederhanaan dan sifat kerakyatan yang didukung oleh

    penguasaan ilmu pengetahuan dan teknologi, dimana dapat mengakomodasikan secara

    dinamis kepentingan berbagai golongan dan suku-suku dalam masyarakat serta mampu

    mengelola perbedaan bagi kebersamaan.

    2. Misi Pembangunan Daerah

    - Pengentasan kemiskinan di wilayah-wilayah terpencil, terisolir dan tertinggal melalui pemerataan pembangunan dengan membantu kemudahan

    mengakses pada sumberdaya informasi, modal dan teknologi.

    - Mendorong kegiatan perekonomian wilayah dengan membangkitkan pusat-pusat pertumbuhan ekonomi di kecamatan yang berbasis sumber daya alam

    dengan tetap menjaga kelestarian dan kualitas sumber daya alam.

    - Dengan terciptanya pusat pertumbuhan tersebut diharapkan terjadi pergerakan kegiatan ekonomi skala kecil dan menengah sebagai wujud

    keberpihakan pada pengembangan ekonomi kerakyatan.

    - Peningkatan kemampuan sumber daya manusia birokrasi, sehingga terciptanya aparat yang bersih dan profesional dalam kinerja serta pelayanan

    publik yang pada gilirannya akan meningkatkan efisiensi dan efektifitas

    manajemen pembangunan.

    2.2.2. Pertanahan dan Penataan Ruang

    1. Sub Sektor Pertanahan

    - Mengembangkan kebijakan dan iklim (intensif dan disintensif) yang dapat memperbesar ketersediaan tanah untuk kebutuhan masyarakat kecil dan

    kepentingan umum.

    - Mengembangkan kapasitas administrasi pertanahan yang efektif meliputi prosedur penguasaan, hak kepemilikan, dan pengalihan hak atas tanah.

  • Studi Kelayakan Fly Over Jalan Arteri Utara Timur (Paket-7)

    Laporan Akhir Bab 2 -

    12

    - Meningkatkan ketersediaan data dan informasi pertanahan untuk meningkatkan administrasi pertanahan, mempermudah proses transaksi

    penjualan tanah dan pemanfaatan tanah untuk kegiatan investasi, dan

    peningkatan administrasi perpajakan tanah untuk meningkatkan pendapatan

    daerah.

    - Meningkatkan keterlibatan unsur-unsur kelompok independen dalam pengelolaan pembebasan tanah untuk kepentingan umum dan pembangunan

    skala besar agar berbagai kepentingan yang berbeda dapat dipertemukan

    secara memuaskan bagi semua pihak.

    2. Sub Sektor Penataan Ruang

    - Memantapkan sistem perencanaan tata ruang dengan meningkatkan ketersediaan rencana tata ruang wilayah, kawasan perkotaan, kawasan

    perdesaan, dan kawasan khusus yang dilakukan secara transparan,

    partisipatif, dan sesuai dengan kaidah pembangunan.

    - Meningkatkan ketertiban pemanfaatan ruang melalui penyediaan rencana rinci tata ruang dan melengkapinya dengan kebijakan, peraturan-peraturan

    standar, mekanisme perijinan dalam pemanfaatan ruang serta pengendalian

    pemanfaatan ruang.

    - Meningkatkan kapasitas kelembagaan penataan ruang melalui pengembangan prosedur dan mekanisme, pengembangan organisasi,

    pemasyarakatan prinsip penataan ruang, termasuk mengenai hak dan

    kewajiban masyarakat dalam penyusunan rencana, perwujudan pemanfaatan

    ruang, dan pengendalian pemanfaatan ruang.

    2.2.3. Kebijakan Kawasan Handalan Yogyakarta dan Sekitarnya

    Konsep atau pendekatan dalam pengembangan wilayah handalan yaitu

    kecamatan, bahwa kecamatan sebagai pusat pertumbuhan ekonomi berkecenderungan

    menganut konsep basis ekonomi. Kecamatan sebagai pusat pertumbuhan ekonomi

    dianggap sebagai unit area pengembangan oleh karena wilayah kecamatan telah

    mempunyai variasi kegiatan ekonomi (tidak terlalu homogen) baik dalam kegiatan

    primer, sekunder dan tersier.

  • Studi Kelayakan Fly Over Jalan Arteri Utara Timur (Paket-7)

    Laporan Akhir Bab 2 -

    13

    Oleh sebab itu, strategi yang dijalankan kecamatan sebagai pusat pertumbuhan

    ekonomi dalam rangka peningkatan kawasan andalan adalah:

    a. Kecamatan sebagai pusat jasa distribusi yang akan melayani secara langsung

    kegiatan ekonomi produktif pada hinterlandnya yang dapat meliputi

    pengangkutan, sortase, dan pengepakan awal.

    b. Kecamatan sebagai pusat kegiatan industri kecil dan menengah baik yang

    berorientasi lokal maupun global, baik yang bersifat mengolah hasil

    pertanian, kehutanan, perkebunan mapun mengolah hasil lainnya.

    c. Kecamatan sebagai pusat penyediaan jasa pelayanan prasarana (input)

    produksi pertanian seperti penyediaan alat-alat pertanian, penyediaan jasa

    perbankan maupun jasa manajemen dan teknik kegiatan pertanian.

    d. Kecamatan sebagai lokasi kegiatan ekonomi lainnya yang ditumbuhkan

    karena adanya keuntungan terbandingkan (corporative advantage) sebagai

    misal dari adanya potensi sektor wisata di wilayah tersebut.

    e. Kecamatan sebagai pusat pertumbuhan berada dalam satu kesatuan sistem

    dengan sistem global yang akan berpusat di kota Yogyakarta, dimana

    Yogyakarta akan lebih berfungsi terutama sebagai pusat pelayanan informasi

    pasar dan manajemen maupun teknologi.

    f. Berdasarkan hasil koordinasi provinsi, kabupaten, dan kecamatan serta tujuh

    pilar bidang penggerak pertumbuhan ekonomi disepakati mengenai tipologi

    orientasi pengembangan kecamatan seperti tercantum pada tabel berikut ini.

  • Studi Kelayakan Fly Over Jalan Arteri Utara Timur (Paket-7)

    Laporan Akhir Bab 2 -

    14

    Tabel 2.9. Tipologi Pengembangan Kecamatan Sebagai Pusat Pertumbuhan Ekonomi di Provinsi Daerah Istimewa Yogyakarta Tahun 1999

    Kabupaten Kecamatan Orientasi

    Pengembangan Keterangan

    Distribusi Hasil agro dan olahannya, hasil kerajinan kulit, dan indutri lainnya Piyungan

    Produksi Agro: emping mlinjo, kerajinan kulit, industri lainnya

    Pundong Produksi Industri: gerabah, keramik dari tanah liat

    Wisata Pantai, ritual

    Bantul

    Srandakan Produksi Agro: peternakan, perikanan, pertanian

    Distribusi Agro dari wilayah hinterlandnya, hasil kerajinan industri kecil Godean

    Produksi Industri kecil: genting, kerajinan, bambu

    Wisata Alam: vulkano, hutan Pakem

    Produksi Agro: peternakan sapi potong

    Sleman

    Turi Produksi Agro: salak pondoh dan olahannya

    Temon Produksi Agro: semangka, cabe, bawang merah

    Sentolo Produksi Kerajinan: agel, wayang golek

    Samigaluh Produksi Agro: teh, kakao Kulon Progo

    Galur Produksi Perikanan laut, perkebunan pinggir pantai (jarak empyak)

    Ponjong Produksi

    Agro: empon-empon, buah-buahan, kakao Tambang: kalsium karbonat, batu akik

    Produksi Agro: perikanan laut Tepus

    Wisata Alam: pantai

    Playen Produksi Agroforestry: kayu sonokeling, mahoni, jati

    Produksi Kerajinan: tatah sungging, bambu

    Gunung Kidul

    Semin Distribusi Hasil-hasil agro hinterlandnya dan hasil kerajinan

    Sumber : BAPPEDA Provinsi D.I. Yogyakarta, 1999

  • Studi Kelayakan Fly Over Jalan Arteri Utara Timur (Paket-7)

    Laporan Akhir Bab 2 -

    15

    2.3. KONDISI WILAYAH SEKITAR JALAN ARTERI UTARA TIMUR

    Jalan arteri utara timur membentang dari simpang Jombor di sebelah barat

    sampai simpang Maguwo di sebelah timur sepanjang kurang lebih 10 km. Jalan ini

    memiliki 6 lajur dengan dua arah terbagi terdiri dari 4 lajur cepat dan 2 lajur lambat.

    Lebar damija rata-rata 30 meter.

    Secara administratif ruas jalan arteri utara timur ini melintasi 3 kecamatan di

    Kabupaten Sleman yaitu Kecamatan Mlati, Kecamatan Ngaglik dan Kecamatan Depok.

    Tata guna lahan di wilayah ini sebagian besar merupakan daerah pemukiman, namun

    dalam perkembangannya wilayah ini tumbuh menjadi daerah komersial. Hal ini ditanda

    dengan tumbuhnya aktivitas perdagangan disepanjang ruas jalan ini yang berupa

    pembangunan ruko-ruko baru, supermarket, dan perkantoran swasta.

    Sepanjang jalan ini terdapat 6 simpang yaitu Jombor, simpang Monjali, simpang

    Kentungan, simpang Gejayan, simpang UPN dan simpang Maguwoharjo. Ruas jalan ini

    berpotongan dengan ruas-ruas jalan lain baik jalan nasional, propinsi maupun

    kabupaten/kota di simpang-simpang tersebut. Simpang Jombor mempertemukan ruas

    jalan arteri utara timur dengan jalan Magelang. Sedangkan Jalan Nyi Condrolukito dan

    Jalan Palagan bertemu dengan ruas jalan arteri utara timur di simpang Monjali. Ruas

    Jalan Kaliurang bertemu dengan ruas jalan arteri utara timur di simpang Kentungan.

    Sedangkan Jalan Anggajaya dan Jalan Affandi bertemu dengan ruas jalan arteri utara

    timur di simpang Gejayan. Jalan Prawirokuat dan Jalan Seturan bertemu di simpang

    UPN. Ruas Jalan Solo bertemu dengan jalan arteri utara timur di Simpang Maguwoharjo.

    Lokasi-lokasi kegiatan penting yang berada di sepanjang ruas jalan ini antara lain

    terminal Jombor di sekitar simpang Jombor, Monumen Yogya Kembali di sekitar simpang

    Monjali, Terminal Condongcatur di sekitar simpang Gejayan dan Kampus UPN di sekitar

    simpang UPN. Secara lebih jelas ruas jalan arteri utara timur dapat dilihat pada Gambar

    2.1.

  • PA

    U

    KE

    ULOW

    TP

    AU

    KE

    ULOW

    T

    I

    KEKA

    L URA

    NG

    I

    KEKA

    L URA

    NG

    Jl. Laksda AdisuciptoJl. Laksda Adisucipto

    U ip um harJl. r S o jo U ip um harJl. r S o joJl. Jen. SudirmanJl. Jen. Sudirman

    . . D on g oJl P ip e or. . D on g oJl P ip e orl

    jJ

    . Kyai Mo ol

    jJ

    . Kyai Mo o

    Mla

    nJl.

    age

    gM

    lan

    Jl.

    age

    g

    J .

    Aan

    gaji

    lM

    SJ .

    Aan

    gaji

    lM

    S

    l C

    ima

    ju

    J .

    .S

    nnt

    ak

    l C

    ima

    ju

    J .

    .S

    nnt

    ak

    KE SOLOKE SOLO

    K DEAN

    E GOK DEANE GO

    STUDI KELAYAKAN FLY OVERJALAN ARTERI UTARA TIMURPROPINSI D.I. YOGYAKARTA

    STUDI KELAYAKAN FLY OVERJALAN ARTERI UTARA TIMURPROPINSI D.I. YOGYAKARTA

    PETA RUAS JALAN ARTERI UTARA TIMURPETA RUAS JALAN ARTERI UTARA TIMUR

    L E G E N D A :L E G E N D A :

    : JALAN NASIONAL ARTERI : JALAN NASIONAL ARTERI

    : JALAN PROPINSI KOLEKTOR : JALAN PROPINSI KOLEKTOR

    : JALAN KABUPATEN KOLEKTOR: JALAN KABUPATEN KOLEKTOR

    EJL

    .AR

    TRI

    UTAR

    A BA

    RAT

    EJL

    .AR

    TRI

    UTAR

    A BA

    RAT

    UU

    G RNO AMBA G RNO AMBA

    UD G MBAJ UL A RUD G MBAJ UL A R

    AG MBAR 2.1AG MBAR 2.1 AB 2 - 16BAB 2 - 16B

    HAL MANAHAL MANA

    KEC. DEPOKKEC. DEPOK

    EK C. MLATIEK C. MLATI

    : JALAN AGLOMERASI: JALAN AGLOMERASI

    : TERMINAL JOMBOR: TERMINAL JOMBOR

    : TERMINAL CONDONGCATUR: TERMINAL CONDONGCATUR

    : MONUMEN YOGYA KEMBALI: MONUMEN YOGYA KEMBALI

    : KAMPUS UPN: KAMPUS UPN

    : KAMPUS UGM: KAMPUS UGM

    KE

    MAG

    ELAN

    GKE

    MAG

    ELAN

    G

    Jl.

    Gejay

    anJl.

    Gejay

    an

    lJ . Demak Ijo

    lJ . Demak Ijo

    Simpang Jombor

    Simpang Monjali

    Simpang Jl. Kaliurang/Kentungan

    Simpang Condong Catur/ Gejayan

    Simpang UPN

    Simpang Maguwo

    DEPARTEMEN PEKERJAAN UMUMDIREKTORAT JENDERAL BINA MARGASATKER NVT PERENCANAAN DAN PENGAWASAN JALAN DAN JEMBATANP R O P I N S I D A E R A H I S T I M E W A Y O G Y A K A R T AJalan Ring Road Utara Maguwoharjo, Depok, Sleman, Yogyakarta - Telp (0274)488583 - Kode Pos 55282

    AR ERI TAR T UR

    JL. T

    U A IM

    AR ERI TAR T UR

    JL. T

    U A IM

    Page 1Lokasi Studi Gambar 1.1.pdfPage 1

    Gambar 2.1.pdfPage 1

    COVER DALAM UKL - UPL.pdfPage 1