FORM CBR BAYU.pdf

12
7/23/2019 FORM CBR BAYU.pdf http://slidepdf.com/reader/full/form-cbr-bayupdf 1/12 UNIVERSITAS PANCASILA LABORATORIUM SIPIL FAKULTAS TEKNIK MEKANIKA TANAH  – UKUR TANAH  – JALAN & ASPAL  – KONST. BETON - HIDROLIKA Lampiran Surat/Laporan No. : 1 Dikerjakan : BAYU PAMUNGKAS WARMAN (I Pekerjaan : CBR Unsoaked Diperiksa : Ir. Dra. Erna Savitri, MT (10 Pukulan) TanggalPemeriksaan : 16 Desember 2014 PEMERIKSAAN CBR LABORATORIUM PENGEMBANGAN TANGGAL : JAM : PEMBACAAN : GRAFIK BERAT ISI SEBELUM SESUD A BRT CETAKAN 3500 gr B BRT TANAH + CETAKAN 6200 gr C DIAMETER CETAKAN 15,34 cm D TINGGI CETAKAN 16,5 cm E BRT TANAH BASAH F VOL CETAKAN=¼ π(C) 2 (D) G BRT ISI BASAH = (E)/(F) H BRT ISI KERING (G) 1+M  PENETRASI WAKTU (MIN) PENURUNAN (INCH) PEMBACAAN DIAL PER (DIV) BEBAN (LBS) 0.25 0.0125 2 0.5 0.0250 3 1 0.0500 5 1.5 0.0750 6 2 0.1000 8 3 0.1500 10 4 0.2000 13 6 0.3000 18 8 0.4000 22 10 0.5000 27  NILAI CBR 0.1 3×1000 ×100%= KADAR AIR SEBELUM I NOMOR TIN BOX A B C J BERAT TIN BOX 12.14 gr 12.09 gr 11.98 gr K B.TIN BOX + TANAH BASAH 33.49 gr 40.26 gr 40.63 gr L B.TIN BOX + TANAH KERING 30.12 gr 33.26 gr 33.65 gr M BERAT TANAH KERING  N BERAT AIR = ( I  –  J ) O KADAR AIR = L × 100% RATA  –  RATA PengujianKepadatan :Ringan / Berat Beratisi yang dikehendaki: gr/ cm³

Transcript of FORM CBR BAYU.pdf

Page 1: FORM CBR BAYU.pdf

7/23/2019 FORM CBR BAYU.pdf

http://slidepdf.com/reader/full/form-cbr-bayupdf 1/12

UNIVERSITAS PANCASILA

LABORATORIUM SIPIL FAKULTAS TEKNIKMEKANIKA TANAH  – UKUR TANAH  – JALAN & ASPAL  – KONST. BETON - HIDROLIKA

Lampiran Surat/Laporan No. : 1 Dikerjakan : BAYU PAMUNGKAS WARMAN (I

Pekerjaan : CBR Unsoaked Diperiksa : Ir. Dra. Erna Savitri, MT(10 Pukulan) TanggalPemeriksaan : 16 Desember 2014

PEMERIKSAAN CBR LABORATORIUM

PENGEMBANGAN

TANGGAL :

JAM :

PEMBACAAN :

GRAFIK

BERAT ISI SEBELUM SESUD

A BRT CETAKAN 3500 gr

B BRT TANAH + CETAKAN 6200 gr

C DIAMETER CETAKAN 15,34 cm

D TINGGI CETAKAN 16,5 cm

E BRT TANAH BASAH

F VOL CETAKAN=¼ π(C)2(D)

G BRT ISI BASAH = (E)/(F)

H BRT ISI KERING(G)

1+M 

PENETRASI

WAKTU

(MIN)

PENURUNAN

(INCH)

PEMBACAAN

DIAL PER (DIV)

BEBAN

(LBS)

0.25 0.0125 2

0.5 0.0250 3

1 0.0500 5

1.5 0.0750 62 0.1000 8

3 0.1500 10

4 0.2000 13

6 0.3000 18

8 0.4000 22

10 0.5000 27

 NILAI CBR

0.13×1000

×100%=

KADAR AIR SEBELUM

I NOMOR TIN BOX A B C

J BERAT TIN BOX 12.14 gr 12.09 gr 11.98 gr

K B.TIN BOX + TANAH BASAH 33.49 gr 40.26 gr 40.63 gr

L B.TIN BOX + TANAH KERING 30.12 gr 33.26 gr 33.65 gr

M BERAT TANAH KERING

 N BERAT AIR = ( I  –  J )

O KADAR AIR =L

K × 100% 

RATA  –  RATA

PengujianKepadatan :Ringan / Berat Beratisi yang dikehendaki: gr/ cm³

Page 2: FORM CBR BAYU.pdf

7/23/2019 FORM CBR BAYU.pdf

http://slidepdf.com/reader/full/form-cbr-bayupdf 2/12

UNIVERSITAS PANCASILA

LABORATORIUM SIPIL FAKULTAS TEKNIKMEKANIKA TANAH  – UKUR TANAH  – JALAN & ASPAL  – KONST. BETON - HIDROLIKA

Lampiran Surat/Laporan No. : 1 Dikerjakan : BAYU PAMUNGKAS WARMAN (I

Pekerjaan : CBR Unsoaked Diperiksa : Ir. Dra. Erna Savitri, MT(10 Pukulan) TanggalPemeriksaan : 16 Desember 2014

PEMERIKSAAN CBR LABORATORIUM

PENGEMBANGAN

TANGGAL :

JAM :

PEMBACAAN :

GRAFIK

BERAT ISI SEBELUM SESUD

A BRT CETAKAN 3500 gr

B BRT TANAH + CETAKAN 6200 gr

C DIAMETER CETAKAN 15,34 cm

D TINGGI CETAKAN 16,5 cm

E BRT TANAH BASAH 2700 gr

F VOL CETAKAN=¼ π(C)2(D) 3047,92 cm³

G BRT ISI BASAH = (E)/(F) 0,885 gr/cm³

H BRT ISI KERING(G)

1+M  0,030 gr/cm³

PENETRASI

WAKTU

(MIN)

PENURUNAN

(INCH)

PEMBACAAN

DIAL PER (DIV)

BEBAN

(LBS)

0.25 0.0125 2 52.88

0.5 0.0250 3 79.32

1 0.0500 5 132.20

1.5 0.0750 6 158.642 0.1000 8 211.52

3 0.1500 10 264.40

4 0.2000 13 343.72

6 0.3000 18 475.92

8 0.4000 22 581.68

10 0.5000 27 713.88

 NILAI CBR

0.1211.52

3×1000×100%= 7.050 %

KADAR AIR SEBELUM

G NOMOR TIN BOX A B C

H BERAT TIN BOX 12.14 gr 12.09 gr 11.98 gr

I B.TIN BOX + TANAH BASAH 33.49 gr 40.26 gr 40.63 gr

J B.TIN BOX + TANAH KERING 30.12 gr 33.26 gr 33.65 gr

K BERAT TANAH KERING 17.98 gr 21.17 gr 21.67 gr

L BERAT AIR = ( I  –  J ) 3.37 gr 7.00 gr 6.98 gr

M KADAR AIR =L

K × 100%  18.743 % 33.065 % 32.210 %

RATA  –  RATA 28.006 % 28.006 % 28.006 %

PengujianKepadatan :Ringan / Berat Beratisi yang dikehendaki: gr/ cm³

Page 3: FORM CBR BAYU.pdf

7/23/2019 FORM CBR BAYU.pdf

http://slidepdf.com/reader/full/form-cbr-bayupdf 3/12

UNIVERSITAS PANCASILA

LABORATORIUM SIPIL FAKULTAS TEKNIKMEKANIKA TANAH  – UKUR TANAH  – JALAN & ASPAL  – KONST. BETON - HIDROLIKA

Lampiran Surat/Laporan No. : 4 Dikerjakan : BAYU PAMUNGKAS WARMAN (I

Pekerjaan : CBR Soaked Diperiksa : Ir. Dra. Erna Savitri, MT(10 Pukulan) TanggalPemeriksaan : 16 Desember 2014

PEMERIKSAAN CBR LABORATORIUM

PENGEMBANGAN

TANGGAL : 18/11 19/11 20/11 21/11

JAM : 17.00 17.00 17.00 17.00

PEMBACAAN : 0.28 0.30 0.30 0.30

GRAFIK

BERAT ISI SEBELUM SESUD

A BRT CETAKAN 3500

B BRT TANAH + CETAKAN 6200

C DIAMETER CETAKAN 15,34 c

D TINGGI CETAKAN 16,5 c

E BRT TANAH BASAH

F VOL CETAKAN=¼ π(C)2(D)

G BRT ISI BASAH = (E)/(F)

H BRT ISI KERING(G)

1+M 

PENETRASI

WAKTU

(MIN)

PENURUNAN

(INCH)

PEMBACAAN

DIAL PER (DIV)

BEBAN

(LBS)

0.25 0.0125 1

0.5 0.0250 2

1 0.0500 3

1.5 0.0750 42 0.1000 5

3 0.1500 7

4 0.2000 9

6 0.3000 10

8 0.4000 12

10 0.5000 14

 NILAI CBR

0.13×1000

×100%=

KADAR AIR SEBELUM

I NOMOR TIN BOX A B C

J BERAT TIN BOX 12.15 gr 12.10 gr 11.71 gr

K B.TIN BOX + TANAH BASAH 31.5 gr 40 gr 27.00 gr

L B.TIN BOX + TANAH KERING 25.00 gr 30.5 gr 21.70 gr

M BERAT TANAH KERING

 N BERAT AIR = ( I  –  J )

O KADAR AIR =L

K × 100% 

RATA  –  RATA

PengujianKepadatan :Ringan / Berat Beratisi yang dikehendaki: gr/ cm³

Page 4: FORM CBR BAYU.pdf

7/23/2019 FORM CBR BAYU.pdf

http://slidepdf.com/reader/full/form-cbr-bayupdf 4/12

UNIVERSITAS PANCASILA

LABORATORIUM SIPIL FAKULTAS TEKNIKMEKANIKA TANAH  – UKUR TANAH  – JALAN & ASPAL  – KONST. BETON - HIDROLIKA

Lampiran Surat/Laporan No. : 4 Dikerjakan : BAYU PAMUNGKAS WARMAN (IPekerjaan : CBR Soaked Diperiksa : Ir. Dra. Erna Savitri, MT

(10 Pukulan) TanggalPemeriksaan : 16 Desember 2014

PEMERIKSAAN CBR LABORATORIUM

PENGEMBANGAN

TANGGAL : 18/11 19/11 20/11 21/11

JAM : 17.00 17.00 17.00 17.00

PEMBACAAN : 0.28 0.30 0.30 0.30

GRAFIK

BERAT ISI SEBELUM SESUD

A BRT CETAKAN 3500

B BRT TANAH + CETAKAN 6200

C DIAMETER CETAKAN 15,34 c

D TINGGI CETAKAN 16,5 c

E BRT TANAH BASAH 2700 F VOL CETAKAN=¼ π(C)

2(D) 3047,92

G BRT ISI BASAH = (E)/(F) 0.885 gr

H BRT ISI KERING(G)

1+M  0.076 gr

PENETRASI

WAKTU

(MIN)

PENURUNAN

(INCH)

PEMBACAAN

DIAL PER (DIV)

BEBAN

(LBS)

0.25 0.0125 1 26.44

0.5 0.0250 2 52.88

1 0.0500 3 79.32

1.5 0.0750 4 105.76

2 0.1000 5 132.20

3 0.1500 7 185.08

4 0.2000 9 237.96

6 0.3000 10 264.40

8 0.4000 12 317.28

10 0.5000 14 370.16

 NILAI CBR

0.1132,20

3×1000×100% = 4,406 %

KADAR AIR SEBELUM

I NOMOR TIN BOX A B C

J BERAT TIN BOX 12.15 gr 12.10 gr 11.71 gr

K B.TIN BOX + TANAH BASAH 31.5 gr 40 gr 27.00 gr

L B.TIN BOX + TANAH KERING 25.00 gr 30.5 gr 21.70 gr

M BERAT TANAH KERING 12.85 gr 18.40 gr 9.70 gr

 N BERAT AIR = ( I  –  J ) 6.50 gr 9.50 gr 5.30 gr

O KADAR AIR =L

K × 100%  50.583 % 51.630 % 54.634 %

RATA  –  RATA 52.282 % 52.282 % 52.282 %

PengujianKepadatan :Ringan / Berat Beratisi yang dikehendaki: gr/ cm³

Page 5: FORM CBR BAYU.pdf

7/23/2019 FORM CBR BAYU.pdf

http://slidepdf.com/reader/full/form-cbr-bayupdf 5/12

UNIVERSITAS PANCASILA

LABORATORIUM SIPIL FAKULTAS TEKNIKMEKANIKA TANAH  – UKUR TANAH  – JALAN & ASPAL  – KONST. BETON - HIDROLIKA

Lampiran Surat/Laporan No. : 2 Dikerjakan : BAYU PAMUNGKAS WARMAN (I

Pekerjaan : CBR Unsoaked Diperiksa : Ir. Dra. Erna Savitri, MT

(25 Pukulan) TanggalPemeriksaan : 16 Desember 2014

PEMERIKSAAN CBR LABORATORIUM

PENGEMBANGAN

TANGGAL :

JAM :

PEMBACAAN :

GRAFIK

BERAT ISI SEBELUM SESUD

A BRT CETAKAN 3600 gr

B BRT TANAH + CETAKAN 6800 gr

C DIAMETER CETAKAN 15,5 cm

D TINGGI CETAKAN 17,7 cm

E BRT TANAH BASAHF VOL CETAKAN=¼ π(C)

2(D)

G BRT ISI BASAH = (E)/(F)

H BRT ISI KERING(G)

1+M 

PENETRASI

WAKTU

(MIN)

PENURUNAN

(INCH)

PEMBACAAN

DIAL PER (DIV)

BEBAN

(LBS)

0.25 0.0125 2

0.5 0.0250 4

1 0.0500 7

1.5 0.0750 10

2 0.1000 12

3 0.1500 15

4 0.2000 19

6 0.3000 26

8 0.4000 32

10 0.5000 37

 NILAI CBR

0.13×1000

×100%=

KADAR AIR SEBELUM

I NOMOR TIN BOX A B C

J BERAT TIN BOX 14,20gr 15,00 gr 17,3 gr

K B.TIN BOX + TANAH BASAH 56,80gr 48,20 gr 63 gr

L B.TIN BOX + TANAH KERING 46,22 gr 40,05 gr 52 gr

M BERAT TANAH KERING

 N BERAT AIR = ( I  –  J )

O KADAR AIR =L

K × 100% 

RATA  –  RATA

PengujianKepadatan :Ringan / Berat Beratisi yang dikehendaki: gr/ cm³

Page 6: FORM CBR BAYU.pdf

7/23/2019 FORM CBR BAYU.pdf

http://slidepdf.com/reader/full/form-cbr-bayupdf 6/12

UNIVERSITAS PANCASILA

LABORATORIUM SIPIL FAKULTAS TEKNIKMEKANIKA TANAH  – UKUR TANAH  – JALAN & ASPAL  – KONST. BETON - HIDROLIKA

Lampiran Surat/Laporan No. : 2 Dikerjakan : BAYU PAMUNGKAS WARMAN (I

Pekerjaan : CBR Unsoaked Diperiksa : Ir. Dra. Erna Savitri, MT(25 Pukulan) TanggalPemeriksaan : 16 Desember 2014

PEMERIKSAAN CBR LABORATORIUM

PENGEMBANGAN

TANGGAL :

JAM :

PEMBACAAN :

GRAFIK

BERAT ISI SEBELUM SESUD

A BRT CETAKAN 3600 gr

B BRT TANAH + CETAKAN 6800 gr

C DIAMETER CETAKAN 15,5 cm

D TINGGI CETAKAN 17,7 cm

E BRT TANAH BASAH 3200 grF VOL CETAKAN=¼ π(C)

2(D) 3338,154 cm³

G BRT ISI BASAH = (E)/(F) 0,959 gr/cm³

H BRT ISI KERING(G)

1+M  0,724 gr/cm³

PENETRASI

WAKTU

(MIN)

PENURUNAN

(INCH)

PEMBACAAN

DIAL PER (DIV)

BEBAN

(LBS)

0.25 0.0125 2 52,88

0.5 0.0250 4 105,76

1 0.0500 7 185,08

1.5 0.0750 10 264,40

2 0.1000 12 317,28

3 0.1500 15 396,60

4 0.2000 19 502,36

6 0.3000 26 687,44

8 0.4000 32 846,08

10 0.5000 37 978,28

 NILAI CBR

0.1317,28

3×1000×100%= 10,576 %

KADAR AIR SEBELUM

I NOMOR TIN BOX A B C

J BERAT TIN BOX 14,20gr 15,00 gr 17,3 gr

K B.TIN BOX + TANAH BASAH 56,80gr 48,20 gr 63 gr

L B.TIN BOX + TANAH KERING 46,22 gr 40,05 gr 52 gr

M BERAT TANAH KERING 32,02 gr 25,05 gr 34,7 gr

 N BERAT AIR = ( I  –  J ) 10,58 gr 8,15 gr 11 gr

O KADAR AIR =L

K × 100%  33,04 % 32.53 % 31,70 %

RATA  –  RATA 32.42 % 32.42 % 32.42 %

PengujianKepadatan :Ringan / Berat Beratisi yang dikehendaki: gr/ cm³

Page 7: FORM CBR BAYU.pdf

7/23/2019 FORM CBR BAYU.pdf

http://slidepdf.com/reader/full/form-cbr-bayupdf 7/12

UNIVERSITAS PANCASILA

LABORATORIUM SIPIL FAKULTAS TEKNIKMEKANIKA TANAH  – UKUR TANAH  – JALAN & ASPAL  – KONST. BETON - HIDROLIKA

Lampiran Surat/Laporan No. : 5 Dikerjakan : BAYU PAMUNGKAS WARMAN (I

Pekerjaan : CBR Soaked Diperiksa : Ir. Dra. Erna Savitri, MT

(25 Pukulan) TanggalPemeriksaan : 16 Desember 2014

PEMERIKSAAN CBR LABORATORIUM

PENGEMBANGAN

TANGGAL : 18/11 19/11 20/11 21/11

JAM : 17.00 17.00 17.00 17.00

PEMBACAAN : 0.30 0.35 0.40 0.40

GRAFIK

BERAT ISI SEBELUM SESUD

A BRT CETAKAN 3600

B BRT TANAH + CETAKAN 7600

C DIAMETER CETAKAN 15,5 c

D TINGGI CETAKAN 17,7 c

E BRT TANAH BASAHF VOL CETAKAN=¼ π(C)

2(D)

G BRT ISI BASAH = (E)/(F)

H BRT ISI KERING(G)

1+M 

PENETRASI

WAKTU

(MIN)

PENURUNAN

(INCH)

PEMBACAAN

DIAL PER (DIV)

BEBAN

(LBS)

0.25 0.0125 2

0.5 0.0250 4

1 0.0500 5

1.5 0.0750 7

2 0.1000 9

3 0.1500 12

4 0.2000 13

6 0.3000 15

8 0.4000 17

10 0.5000 18

 NILAI CBR

0.13×1000

×100%=

KADAR AIR SEBELUM

I NOMOR TIN BOX A B C

J BERAT TIN BOX 12gr 13 gr 15,1 gr

K B.TIN BOX + TANAH BASAH 42,5 gr 34 gr 35 gr

L B.TIN BOX + TANAH KERING 33,45 gr 27,95 gr 29,1 gr

M BERAT TANAH KERING

 N BERAT AIR = ( I  –  J )

O KADAR AIR =L

K × 100% 

RATA  –  RATA

PengujianKepadatan :Ringan / Berat Beratisi yang dikehendaki: gr/ cm³

Page 8: FORM CBR BAYU.pdf

7/23/2019 FORM CBR BAYU.pdf

http://slidepdf.com/reader/full/form-cbr-bayupdf 8/12

UNIVERSITAS PANCASILA

LABORATORIUM SIPIL FAKULTAS TEKNIKMEKANIKA TANAH  – UKUR TANAH  – JALAN & ASPAL  – KONST. BETON - HIDROLIKA

Lampiran Surat/Laporan No. : 5 Dikerjakan : BAYU PAMUNGKAS WARMAN (I

Pekerjaan : CBR Soaked Diperiksa : Ir. Dra. Erna Savitri, MT(25 Pukulan) TanggalPemeriksaan : 16 Desember 2014

PEMERIKSAAN CBR LABORATORIUM

PENGEMBANGAN

TANGGAL : 18/11 19/11 20/11 21/11

JAM : 17.00 17.00 17.00 17.00

PEMBACAAN : 0.30 0.35 0.40 0.40

GRAFIK

BERAT ISI SEBELUM SESUD

A BRT CETAKAN 3600

B BRT TANAH + CETAKAN 7600

C DIAMETER CETAKAN 15,5 c

D TINGGI CETAKAN 17,7 c

E BRT TANAH BASAH 4000 F VOL CETAKAN=¼ π(C)

2(D) 3338,154

G BRT ISI BASAH = (E)/(F) 1,198gr

H BRT ISI KERING(G)

1+M  0,846gr

PENETRASI

WAKTU

(MIN)

PENURUNAN

(INCH)

PEMBACAAN

DIAL PER (DIV)

BEBAN

(LBS)

0.25 0.0125 2 52.88

0.5 0.0250 4 105.76

1 0.0500 5 132.20

1.5 0.0750 7 185.08

2 0.1000 9 237.96

3 0.1500 12 317.38

4 0.2000 13 343.72

6 0.3000 15 396.60

8 0.4000 17 449.48

10 0.5000 18 475.92

 NILAI CBR

0.1237,96

3×1000×100%= 7,932 %

KADAR AIR SEBELUM

I NOMOR TIN BOX A B C

J BERAT TIN BOX 12gr 13 gr 15,1 gr

K B.TIN BOX + TANAH BASAH 42,5 gr 34 gr 35 gr

L B.TIN BOX + TANAH KERING 33,45 gr 27,95 gr 29,1 gr

M BERAT TANAH KERING 21,45 gr 14,95 gr 14 gr

 N BERAT AIR = ( I  –  J ) 9,05 gr 6,05 gr 5,9 gr

O KADAR AIR =L

K × 100%  42,19 % 40,46 % 42,14 %

RATA  –  RATA 41,59 % 41,59 % 41,59 %

PengujianKepadatan :Ringan / Berat Beratisi yang dikehendaki: gr/ cm³

Page 9: FORM CBR BAYU.pdf

7/23/2019 FORM CBR BAYU.pdf

http://slidepdf.com/reader/full/form-cbr-bayupdf 9/12

UNIVERSITAS PANCASILA

LABORATORIUM SIPIL FAKULTAS TEKNIKMEKANIKA TANAH  – UKUR TANAH  – JALAN & ASPAL  – KONST. BETON - HIDROLIKA

Lampiran Surat/Laporan No. : 3 Dikerjakan : BAYU PAMUNGKAS WARMAN (IPekerjaan : CBR Unsoaked Diperiksa : Ir. Dra. Erna Savitri, MT

(55 Pukulan) TanggalPemeriksaan : 16 Desember 2014

PEMERIKSAAN CBR LABORATORIUM

PENGEMBANGAN

TANGGAL :

JAM :

PEMBACAAN :

GRAFIK

BERAT ISI SEBELUM SESUD

A BRT CETAKAN 3763 gr

B BRT TANAH + CETAKAN 7300 gr

C DIAMETER CETAKAN 15,4 cm

D TINGGI CETAKAN 17,6 cm

E BRT TANAH BASAHF VOL CETAKAN=¼ π(C)

2(D)

G BRT ISI BASAH = (E)/(F)

H BRT ISI KERING(G)

1+M 

PENETRASI

WAKTU

(MIN)

PENURUNAN

(INCH)

PEMBACAAN

DIAL PER (DIV)

BEBAN

(LBS)

0.25 0.0125 3

0.5 0.0250 7

1 0.0500 19

1.5 0.0750 32

2 0.1000 43

3 0.1500 58

4 0.2000 69

6 0.3000 82

8 0.4000 86

10 0.5000 88

 NILAI CBR

0.13×1000

×100%=

KADAR AIR SEBELUM

I NOMOR TIN BOX A B C

J BERAT TIN BOX 11.90 gr 11.75 gr 11.71 gr

K B.TIN BOX + TANAH BASAH 32.60 gr 32.70 gr 30.50 gr

L B.TIN BOX + TANAH KERING 27.60 gr 27.60 gr 25.70 gr

M BERAT TANAH KERING

 N BERAT AIR = ( I  –  J )

O KADAR AIR =L

K × 100% 

RATA  –  RATA

PengujianKepadatan :Ringan / Berat Beratisi yang dikehendaki: gr/ cm³

Page 10: FORM CBR BAYU.pdf

7/23/2019 FORM CBR BAYU.pdf

http://slidepdf.com/reader/full/form-cbr-bayupdf 10/12

UNIVERSITAS PANCASILA

LABORATORIUM SIPIL FAKULTAS TEKNIKMEKANIKA TANAH  – UKUR TANAH  – JALAN & ASPAL  – KONST. BETON - HIDROLIKA

Lampiran Surat/Laporan No. : 3 Dikerjakan : BAYU PAMUNGKAS WARMAN (I

Pekerjaan : CBR Unsoaked Diperiksa : Ir. Dra. Erna Savitri, MT

(55 Pukulan) TanggalPemeriksaan : 16 Desember 2014

PEMERIKSAAN CBR LABORATORIUM

PENGEMBANGAN

TANGGAL :

JAM :

PEMBACAAN :

GRAFIK

BERAT ISI SEBELUM SESUD

A BRT CETAKAN 3763 gr

B BRT TANAH + CETAKAN 7300 gr

C DIAMETER CETAKAN 15,4 cm

D TINGGI CETAKAN 17,6 cm

E BRT TANAH BASAH 3537 grF VOL CETAKAN=¼ π(C)

2(D) 3276,60 cm³

G BRT ISI BASAH = (E)/(F) 1,079 gr/cm³

H BRT ISI KERING(G)

1+M  0,812 gr/cm³

PENETRASI

WAKTU

(MIN)

PENURUNAN

(INCH)

PEMBACAAN

DIAL PER (DIV)

BEBAN

(LBS)

0.25 0.0125 3 79.32

0.5 0.0250 7 185.08

1 0.0500 19 502.36

1.5 0.0750 32 846.08

2 0.1000 43 1136.9

3 0.1500 58 1533.5

4 0.2000 69 1824.3

6 0.3000 82 2168.0

8 0.4000 86 2273.8

10 0.5000 88 2326.7

 NILAI CBR

0.11136.92

3×1000×100%= 37.897 %

KADAR AIR SEBELUM

I NOMOR TIN BOX A B C

J BERAT TIN BOX 11.90 gr 11.75 gr 11.71 gr

K B.TIN BOX + TANAH BASAH 32.60 gr 32.70 gr 30.50 gr

L B.TIN BOX + TANAH KERING 27.60 gr 27.60 gr 25.70 gr

M BERAT TANAH KERING 15.70 gr 15.85 gr 13.89 gr

 N BERAT AIR = ( I  –  J ) 5.000 gr 5.100 gr 4.800 gr

O KADAR AIR =L

K × 100%  31.85 % 32.18 % 34.56 %

RATA  –  RATA 32.86 % 32.86 % 32.86 %

PengujianKepadatan :Ringan / Berat Beratisi yang dikehendaki: gr/ cm³

Page 11: FORM CBR BAYU.pdf

7/23/2019 FORM CBR BAYU.pdf

http://slidepdf.com/reader/full/form-cbr-bayupdf 11/12

UNIVERSITAS PANCASILA

LABORATORIUM SIPIL FAKULTAS TEKNIKMEKANIKA TANAH  – UKUR TANAH  – JALAN & ASPAL  – KONST. BETON - HIDROLIKA

Lampiran Surat/Laporan No. : 6 Dikerjakan : BAYU PAMUNGKAS WARMAN (I

Pekerjaan : CBR Soaked Diperiksa : Ir. Dra. Erna Savitri, MT(55 Pukulan) TanggalPemeriksaan : 16 Desember 2014

PEMERIKSAAN CBR LABORATORIUM

PENGEMBANGAN

TANGGAL : 18/11 19/11 20/11 21/11

JAM : 17.00 17.00 17.00 17.00

PEMBACAAN : 0.43 0.50 0.56 0.57

GRAFIK

BERAT ISI SEBELUM SESUD

A BRT CETAKAN 3763

B BRT TANAH + CETAKAN 7415

C DIAMETER CETAKAN 15,4 c

D TINGGI CETAKAN 17,6 c

E BRT TANAH BASAHF VOL CETAKAN=¼ π(C)

2(D)

G BRT ISI BASAH = (E)/(F)

H BRT ISI KERING(G)

1+M 

PENETRASI

WAKTU

(MIN)

PENURUNAN

(INCH)

PEMBACAAN

DIAL PER (DIV)

BEBAN

(LBS)

0.25 0.0125 3

0.5 0.0250 7

1 0.0500 19

1.5 0.0750 32

2 0.1000 21

3 0.1500 58

4 0.2000 69

6 0.3000 82

8 0.4000 86

10 0.5000 88

 NILAI CBR

0.13×1000

×100%=

KADAR AIR SEBELUM

I NOMOR TIN BOX A B C

J BERAT TIN BOX 11.90 gr 11.75 gr 11.71 gr

K B.TIN BOX + TANAH BASAH 34.20 gr 37.95 gr 36.30 gr

L B.TIN BOX + TANAH KERING 26.57 gr 29.60 gr 27.36 gr

M BERAT TANAH KERING

 N BERAT AIR = ( I  –  J )

O KADAR AIR =L

K × 100% 

RATA  –  RATA

PengujianKepadatan :Ringan / Berat Beratisi yang dikehendaki: gr/ cm³

Page 12: FORM CBR BAYU.pdf

7/23/2019 FORM CBR BAYU.pdf

http://slidepdf.com/reader/full/form-cbr-bayupdf 12/12

UNIVERSITAS PANCASILA

LABORATORIUM SIPIL FAKULTAS TEKNIKMEKANIKA TANAH  – UKUR TANAH  – JALAN & ASPAL  – KONST. BETON - HIDROLIKA

Lampiran Surat/Laporan No. : 6 Dikerjakan : BAYU PAMUNGKAS WARMAN (I

Pekerjaan : CBR Soaked Diperiksa : Ir. Dra. Erna Savitri, MT(55 Pukulan) TanggalPemeriksaan : 16 Desember 2014

PEMERIKSAAN CBR LABORATORIUM

PENGEMBANGAN

TANGGAL : 18/11 19/11 20/11 21/11

JAM : 17.00 17.00 17.00 17.00

PEMBACAAN : 0.43 0.50 0.56 0.57

GRAFIK

BERAT ISI SEBELUM SESUD

A BRT CETAKAN 3763

B BRT TANAH + CETAKAN 7415

C DIAMETER CETAKAN 15,4 c

D TINGGI CETAKAN 17,6 c

E BRT TANAH BASAH 3652 F VOL CETAKAN=¼ π(C)

2(D) 3276,60

G BRT ISI BASAH = (E)/(F) 1,114 gr

H BRT ISI KERING(G)

1+M  0,733 gr

PENETRASI

WAKTU(MIN)

PENURUNAN(INCH)

PEMBACAANDIAL PER (DIV)

BEBAN(LBS)

0.25 0.0125 3 79.32

0.5 0.0250 7 185.08

1 0.0500 14 370.16

1.5 0.0750 17 449.48

2 0.1000 21 555.24

3 0.1500 23 608.12

4 0.2000 30 793.20

6 0.3000 35 925.40

8 0.4000 40 1057.6

10 0.5000 45 1189.8

 NILAI CBR

0.1555.34

3×1000×100%= 18.508 %

KADAR AIR SEBELUM

I NOMOR TIN BOX A B C

J BERAT TIN BOX 11.90 gr 11.75 gr 11.71 gr

K B.TIN BOX + TANAH BASAH 34.20 gr 37.95 gr 36.30 gr

L B.TIN BOX + TANAH KERING 26.57 gr 29.60 gr 27.36 gr

M BERAT TANAH KERING 14.67 gr 17.85 gr 15.65 gr

 N BERAT AIR = ( I  –  J ) 7.630 gr 8.350 gr 8.940 gr

O KADAR AIR =L

K × 100%  52.01 % 46.77 % 57.12 %

RATA  –  RATA 51,96 % 51,96 % 51,96 %

PengujianKepadatan :Ringan / Berat Beratisi yang dikehendaki: gr/ cm³