excel Uji Sondir

12
BAB III URAIAN HASIL PRAKTIKUM 1. Sondir Sondir - Pengolahan Data Proyek : Sondir Sondir No : Lokasi : Lapangan Depan Hanggar Elevasi : Dikerjakan oleh : Kelompok MAT : Tanggal 6-Feb-13 Depth Cw Tw Kw qc LF LF x 20 cm JHP (m) (Tw - Cw) (kg/cm) (kg/cm) 0 0 0 0 0 0 0 0 0.2 0 0 0 0 0 0 0 0.4 5 9 4 5 0.36 7.20 7.20 0.6 9 12 3 9 0.27 5.40 12.60 0.8 8 10 2 8 0.18 3.60 16.20 1 9 12 3 9 0.27 5.40 21.60 1.2 9 12 3 9 0.27 5.40 27.00 1.4 9 12 3 9 0.27 5.40 32.40 1.6 16 30 14 16 1.26 25.20 57.60 1.8 15 30 15 15 1.35 27.00 84.60 2 9 15 6 9 0.54 10.80 95.40 2.2 9 11 2 9 0.18 3.60 99.00 2.4 8 10 2 8 0.18 3.60 102.60 2.6 4 10 6 4 0.54 10.80 113.40 2.8 9 14 5 9 0.45 9.00 122.40 3 10 14 4 10 0.36 7.20 129.60 3.2 10 13 3 10 0.27 5.40 135.00 3.4 10 12 2 10 0.18 3.60 138.60 3.6 10 11 1 10 0.09 1.80 140.40 3.8 8 9 1 8 0.09 1.80 142.20 4 11 12 1 11 0.09 1.80 144.00 4.2 12 14 2 12 0.18 3.60 147.60 4.4 19 20 1 19 0.09 1.80 149.40 4.6 20 24 4 20 0.36 7.20 156.60 4.8 14 22 8 14 0.72 14.40 171.00 5 19 24 5 19 0.45 9.00 180.00 5.2 22 27 5 22 0.45 9.00 189.00 5.4 12 19 7 12 0.63 12.60 201.60 5.6 16 24 8 16 0.72 14.40 216.00 5.8 14 20 6 14 0.54 10.80 226.80 6 12 21 9 12 0.81 16.20 243.00 6.2 44 52 8 44 0.72 14.40 257.40 6.4 150 185 35 150 3.15 63.00 320.40 (kg/cm 2 ) (kg/cm 2 ) (kg/cm 2 ) (kg/cm 2 )

description

excel Uji Sondir

Transcript of excel Uji Sondir

Page 1: excel Uji Sondir

BAB IIIURAIAN HASIL PRAKTIKUM

1. SondirSondir - Pengolahan Data

Proyek : Sondir Sondir No :Lokasi : Lapangan Depan Hanggar Aer Elevasi :Dikerjakan oleh : Kelompok B3 MAT :

Tanggal : 6-Feb-13

Depth Cw Tw Kw qc LF LF x 20 cm JHP Fr(m) (Tw - Cw) (kg/cm) (kg/cm) (%)

0 0 0 0 0 0 0 0 00.2 0 0 0 0 0 0 0 00.4 5 9 4 5 0.36 7.20 7.20 7.200.6 9 12 3 9 0.27 5.40 12.60 3.000.8 8 10 2 8 0.18 3.60 16.20 2.251 9 12 3 9 0.27 5.40 21.60 3.00

1.2 9 12 3 9 0.27 5.40 27.00 3.001.4 9 12 3 9 0.27 5.40 32.40 3.001.6 16 30 14 16 1.26 25.20 57.60 7.881.8 15 30 15 15 1.35 27.00 84.60 9.002 9 15 6 9 0.54 10.80 95.40 6.00

2.2 9 11 2 9 0.18 3.60 99.00 2.002.4 8 10 2 8 0.18 3.60 102.60 2.252.6 4 10 6 4 0.54 10.80 113.40 13.502.8 9 14 5 9 0.45 9.00 122.40 5.003 10 14 4 10 0.36 7.20 129.60 3.60

3.2 10 13 3 10 0.27 5.40 135.00 2.703.4 10 12 2 10 0.18 3.60 138.60 1.803.6 10 11 1 10 0.09 1.80 140.40 0.903.8 8 9 1 8 0.09 1.80 142.20 1.134 11 12 1 11 0.09 1.80 144.00 0.82

4.2 12 14 2 12 0.18 3.60 147.60 1.504.4 19 20 1 19 0.09 1.80 149.40 0.474.6 20 24 4 20 0.36 7.20 156.60 1.804.8 14 22 8 14 0.72 14.40 171.00 5.145 19 24 5 19 0.45 9.00 180.00 2.37

5.2 22 27 5 22 0.45 9.00 189.00 2.055.4 12 19 7 12 0.63 12.60 201.60 5.255.6 16 24 8 16 0.72 14.40 216.00 4.505.8 14 20 6 14 0.54 10.80 226.80 3.866 12 21 9 12 0.81 16.20 243.00 6.75

6.2 44 52 8 44 0.72 14.40 257.40 1.646.4 150 185 35 150 3.15 63.00 320.40 2.10

(kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2)

Page 2: excel Uji Sondir

Da = 3.65 cm

Db = 3.6 cm Ac = 10.17 cm2

Dpl = 3.6 cm Apl = 10.17 cm2

L = 9.5 cm

Page 3: excel Uji Sondir

Lokasi :

MAT :

Tanggal :

Titik :

Depth qc JHP Fr

(m) (kg/cm) (%)

0.00 0 0.00 0.00

0.20 0 0.00 0.00

0.40 5 7.20 7.20

0.60 9 12.60 3.00

0.80 8 16.20 2.25

1.00 9 21.60 3.00

1.20 9 27.00 3.00

1.40 9 32.40 3.00

1.60 16 57.60 7.88

1.80 15 84.60 9.00

2.00 9 95.40 6.00

2.20 9 99.00 2.00

2.40 8 102.60 2.25

2.60 4 113.40 13.50

2.80 9 122.40 5.00

3.00 10 129.60 3.60

3.20 10 135.00 2.70

3.40 10 138.60 1.80

3.60 10 140.40 0.90

3.80 8 142.20 1.13

4.00 11 144.00 0.82

4.20 12 147.60 1.50

4.40 19 149.40 0.47

4.60 20 156.60 1.80

4.80 14 171.00 5.14

5.00 19 180.00 2.37

5.20 22 189.00 2.05

5.40 12 201.60 5.25

5.60 16 216.00 4.50

5.80 14 226.80 3.86

6.00 12 243.00 6.75

6.20 44 257.40 1.64

6.40 150 320.40 2.10

(kg/cm2)

Page 4: excel Uji Sondir

GRAFIK SONDIR

Proyek : Sondir Sondir No :

Lokasi : Lapangan Depan Hanggar Aero Elevasi :

Dikerjakan oleh : Kelompok B3 MAT :

Tanggal : 6-Feb-13

0 200 400 600 800 1000

0 50 100 1500.00

1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

9.00

JHP qcJHP [kg/cm]

Dep

th [m

]

qc [kg/cm2 ]

0 5 10 15 20 25 30 35 40 45

FR [%]

Page 5: excel Uji Sondir

0 200 400 600 800 1000

0 50 100 1500.00

1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

9.00

JHP qcJHP [kg/cm]

Dep

th [m

]qc [kg/cm2 ]

0 5 10 15 20 25 30 35 40 45

FR [%]

Page 6: excel Uji Sondir

0 5 10 15 20 25 30 35 40 45

FR [%]

Page 7: excel Uji Sondir

0 5 10 15 20 25 30 35 40 45

FR [%]

Page 8: excel Uji Sondir

Da = 3.65 cm Fr (%)

Db = 3.6 cm Ac = 10.17 cm2 0-0,5

Dpl = 3.6 cm Apl = 10.17 cm2 0,2-2

L = 9.5 cm 2,0-5

>5

No. Depth Cw Tw Kw qc Lf Lf x 20 JHP

(m) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm) (kg/cm) (kg/cm)

1 0 0 0 0 0 0 0 0

2 0.2 0 0 0 0 0 0 0

3 0.4 5 9 4 5 0.36 7.20 7.20

4 0.6 9 12 3 9 0.27 5.40 12.60

5 0.8 8 10 2 8 0.18 3.60 16.20

6 1 9 12 3 9 0.27 5.40 21.60

7 1.2 9 12 3 9 0.27 5.40 27.00

8 1.4 9 12 3 9 0.27 5.40 32.40

9 1.6 16 30 14 16 1.26 25.20 57.60

10 1.8 15 30 15 15 1.35 27.00 84.60

11 2 9 15 6 9 0.54 10.80 95.40

12 2.2 9 11 2 9 0.18 3.60 99.00

13 2.4 8 10 2 8 0.18 3.60 102.60

14 2.6 4 10 6 4 0.54 10.80 113.40

15 2.8 9 14 5 9 0.45 9.00 122.40

16 3 10 14 4 10 0.36 7.20 129.60

17 3.2 10 13 3 10 0.27 5.40 135.00

18 3.4 10 12 2 10 0.18 3.60 138.60

19 3.6 10 11 1 10 0.09 1.80 140.40

20 3.8 8 9 1 8 0.09 1.80 142.20

21 4 11 12 1 11 0.09 1.80 144.00

22 4.2 12 14 2 12 0.18 3.60 147.60

23 4.4 19 20 1 19 0.09 1.80 149.40

24 4.6 20 24 4 20 0.36 7.20 156.60

25 4.8 14 22 8 14 0.72 14.40 171.00

26 5 19 24 5 19 0.45 9.00 180.00

27 5.2 22 27 5 22 0.45 9.00 189.00

28 5.4 12 19 7 12 0.63 12.60 201.60

29 5.6 16 24 8 16 0.72 14.40 216.00

30 5.8 14 20 6 14 0.54 10.80 226.80

31 6 12 21 9 12 0.81 16.20 243.00

32 6.2 44 52 8 44 0.72 14.40 257.40

33 6.4 150 185 35 150 3.15 63.00 320.40

(kg/cm2)

LABORATORIUM UJI TANAHJURUSAN TEKNIK SIPIL - POLITEKNIK NEGERI BANDUNG

Page 9: excel Uji Sondir

Perkiraan Jenis Tanah

Kerikil

Pasir

Lanau

Lempung

Fr Perkiraan

(%) Jenis Tanah

0 -

0 -

7.20 Lempung

3.00 Lanau

2.25 Lanau

3.00 Lanau

3.00 Lanau

3.00 Lanau

7.88 Lempung

9.00 Lempung

6.00 Lempung

2.00 Lanau

2.25 Lanau

13.50 Lempung

5.00 Lempung

3.60 Lanau

2.70 Lanau

1.80 Pasir

0.90 Pasir

1.13 Pasir

0.82 Pasir

1.50 Pasir

0.47 Kerikil

1.80 Pasir

5.14 Lempung

2.37 Lanau

2.05 Lanau

5.25 Lempung

4.50 Lanau

3.86 Lanau

6.75 Lempung

1.64 Pasir

2.10 Lanau

LABORATORIUM UJI TANAHJURUSAN TEKNIK SIPIL - POLITEKNIK NEGERI BANDUNG