LABORATORIUM MEKANIKA TANAH JURUSAN TEKNIK SIPIL, FAKULTAS TEKNIK UNIVERSITAS SEBELAS MARET Jl. Ir. Sutami 36 a, Surakarta, Telp (0271)7012979, (0271) 647069 psw. 219, Fax: 634524 S O N D I R Nama Proyek : Pembangunan Rusunawa UNY Titik no. : S1 Lokasi Proyek : Wates, DIY Analisis : Gopta Tanggal Pengujian : 29/07/2009 Dikerjakan oleh : Subur Conus Biconus Friction HL = Total Local No. Depth (H) Friction (m) (kg/cm) (kg/cm) (kg/cm) 1 - ### - - - - - 2 0.20 0.00 0.00 0.00 0.00 0.00 0.00 3 0.40 0.00 5.00 0.00 0.00 0.00 0.00 4 0.60 10.00 15.00 0.00 0.00 0.00 0.00 5 0.80 5.00 20.00 15.00 30.00 30.00 1.50 6 1.00 5.00 25.00 20.00 40.00 70.00 2.00 7 1.20 5.00 15.00 10.00 20.00 90.00 1.00 8 1.40 0.00 10.00 10.00 20.00 110.00 1.00 9 1.60 0.00 5.00 5.00 10.00 120.00 0.50 10 1.80 0.00 5.00 5.00 10.00 130.00 0.50 11 2.00 0.00 0.00 0.00 0.00 130.00 0.00 12 2.20 0.00 5.00 5.00 10.00 140.00 0.50 13 2.40 0.00 5.00 5.00 10.00 150.00 0.50 14 2.60 0.00 5.00 5.00 10.00 160.00 0.50 15 2.80 0.00 5.00 5.00 10.00 170.00 0.50 16 3.00 0.00 5.00 5.00 10.00 180.00 0.50 17 3.20 0.00 5.00 5.00 10.00 190.00 0.50 18 3.40 0.00 5.00 5.00 10.00 200.00 0.50 19 3.60 0.00 5.00 5.00 10.00 210.00 0.50 20 3.80 0.00 10.00 10.00 20.00 230.00 1.00 21 4.00 5.00 10.00 5.00 10.00 240.00 0.50 22 4.20 5.00 10.00 5.00 10.00 250.00 0.50 23 4.40 0.00 5.00 5.00 10.00 260.00 0.50 24 4.60 0.00 5.00 5.00 10.00 270.00 0.50 25 4.80 0.00 10.00 10.00 20.00 290.00 1.00 26 5.00 0.00 10.00 10.00 20.00 310.00 1.00 27 5.20 5.00 20.00 15.00 30.00 340.00 1.50 28 5.40 5.00 20.00 15.00 30.00 370.00 1.50 29 5.60 10.00 20.00 10.00 20.00 390.00 1.00 30 5.80 10.00 20.00 10.00 20.00 410.00 1.00 31 6.00 10.00 20.00 10.00 20.00 430.00 1.00 32 6.20 0.00 5.00 5.00 10.00 440.00 0.50 33 6.40 0.00 0.00 0.00 0.00 440.00 0.00 34 6.60 0.00 0.00 0.00 0.00 440.00 0.00 35 6.80 0.00 5.00 5.00 10.00 450.00 0.50 ( q c ) (q f ) (H-q c )xD/A HT = HL (kg/cm 2 ) (kg/cm 2 ) (kg/cm 2 )

description

p0p00

Transcript of Sondir RitZone BSD

Page 1: Sondir RitZone BSD

LABORATORIUM MEKANIKA TANAHJURUSAN TEKNIK SIPIL, FAKULTAS TEKNIKUNIVERSITAS SEBELAS MARETJl. Ir. Sutami 36 a, Surakarta, Telp (0271)7012979, (0271) 647069 psw. 219, Fax: 634524

S O N D I RNama Proyek : Pembangunan Rusunawa UNY Titik no. : S1Lokasi Proyek : Wates, DIY Analisis : GoptaTanggal Pengujian : 29/07/2009Dikerjakan oleh : Subur

Conus Biconus Friction HL = Total Local No. Depth (H) Friction

(m) (kg/cm) (kg/cm) (kg/cm)1 - ### - - - - -

2 0.20 0.00 0.00 0.00 0.00 0.00 0.00

3 0.40 0.00 5.00 0.00 0.00 0.00 0.00

4 0.60 10.00 15.00 0.00 0.00 0.00 0.00

5 0.80 5.00 20.00 15.00 30.00 30.00 1.50

6 1.00 5.00 25.00 20.00 40.00 70.00 2.00

7 1.20 5.00 15.00 10.00 20.00 90.00 1.00

8 1.40 0.00 10.00 10.00 20.00 110.00 1.00

9 1.60 0.00 5.00 5.00 10.00 120.00 0.50

10 1.80 0.00 5.00 5.00 10.00 130.00 0.50

11 2.00 0.00 0.00 0.00 0.00 130.00 0.00

12 2.20 0.00 5.00 5.00 10.00 140.00 0.50

13 2.40 0.00 5.00 5.00 10.00 150.00 0.50

14 2.60 0.00 5.00 5.00 10.00 160.00 0.50

15 2.80 0.00 5.00 5.00 10.00 170.00 0.50

16 3.00 0.00 5.00 5.00 10.00 180.00 0.50

17 3.20 0.00 5.00 5.00 10.00 190.00 0.50

18 3.40 0.00 5.00 5.00 10.00 200.00 0.50

19 3.60 0.00 5.00 5.00 10.00 210.00 0.50

20 3.80 0.00 10.00 10.00 20.00 230.00 1.00

21 4.00 5.00 10.00 5.00 10.00 240.00 0.50

22 4.20 5.00 10.00 5.00 10.00 250.00 0.50

23 4.40 0.00 5.00 5.00 10.00 260.00 0.50

24 4.60 0.00 5.00 5.00 10.00 270.00 0.50

25 4.80 0.00 10.00 10.00 20.00 290.00 1.00

26 5.00 0.00 10.00 10.00 20.00 310.00 1.00

27 5.20 5.00 20.00 15.00 30.00 340.00 1.50

28 5.40 5.00 20.00 15.00 30.00 370.00 1.50

29 5.60 10.00 20.00 10.00 20.00 390.00 1.00

30 5.80 10.00 20.00 10.00 20.00 410.00 1.00

31 6.00 10.00 20.00 10.00 20.00 430.00 1.00

32 6.20 0.00 5.00 5.00 10.00 440.00 0.50

33 6.40 0.00 0.00 0.00 0.00 440.00 0.00

34 6.60 0.00 0.00 0.00 0.00 440.00 0.00

35 6.80 0.00 5.00 5.00 10.00 450.00 0.50

( qc ) (q

f) (H-q

c)xD/A HT = HL

(kg/cm2) (kg/cm2) (kg/cm2)

Page 2: Sondir RitZone BSD

LABORATORIUM MEKANIKA TANAHJURUSAN TEKNIK SIPIL, FAKULTAS TEKNIKUNIVERSITAS SEBELAS MARETJl. Ir. Sutami 36 a, Surakarta, Telp (0271)7012979, (0271) 647069 psw. 219, Fax: 634524

S O N D I RNama Proyek : Pembangunan Rusunawa UNY Titik no. : S1Lokasi Proyek : Wates, DIY Analisis : GoptaTanggal Pengujian : 29/07/2009Dikerjakan oleh : Subur

36 7.00 5.00 15.00 10.00 20.00 470.00 1.00

37 7.20 10.00 20.00 10.00 20.00 490.00 1.00

38 7.40 10.00 25.00 15.00 30.00 520.00 1.50

39 7.60 10.00 25.00 15.00 30.00 550.00 1.50

40 7.80 10.00 25.00 15.00 30.00 580.00 1.50

41 8.00 10.00 25.00 15.00 30.00 610.00 1.50

42 8.20 5.00 10.00 5.00 10.00 620.00 0.50

43 8.40 5.00 20.00 15.00 30.00 650.00 1.50

44 8.60 10.00 20.00 10.00 20.00 670.00 1.00

45 8.80 10.00 20.00 10.00 20.00 690.00 1.00

46 9.00 10.00 20.00 10.00 20.00 710.00 1.00

47 9.20 10.00 20.00 10.00 20.00 730.00 1.00

48 9.40 5.00 15.00 10.00 20.00 750.00 1.00

49 9.60 5.00 15.00 10.00 20.00 770.00 1.00

50 9.80 5.00 15.00 10.00 20.00 790.00 1.00

51 10.00 5.00 15.00 10.00 20.00 810.00 1.00

52 10.20 0.00 5.00 5.00 10.00 820.00 0.50

53 10.40 0.00 5.00 5.00 10.00 830.00 0.50

54 10.60 5.00 10.00 5.00 10.00 840.00 0.50

55 10.80 5.00 10.00 5.00 10.00 850.00 0.50

56 11.00 15.00 25.00 10.00 20.00 870.00 1.00

57 11.20 20.00 30.00 10.00 20.00 890.00 1.00

58 11.40 30.00 40.00 10.00 20.00 910.00 1.00

59 11.60 25.00 35.00 10.00 20.00 930.00 1.00

60 11.80 25.00 35.00 10.00 20.00 950.00 1.00

61 12.00 20.00 35.00 15.00 30.00 980.00 1.50

62 12.20 15.00 35.00 20.00 40.00 1,020.00 2.00

63 12.40 30.00 35.00 5.00 10.00 1,030.00 0.50

64 12.60 40.00 45.00 5.00 10.00 1,040.00 0.50

65 12.80 50.00 60.00 10.00 20.00 1,060.00 1.00

66 13.00 50.00 60.00 10.00 20.00 1,080.00 1.00

67 13.20 50.00 65.00 15.00 30.00 1,110.00 1.50

68 13.40 50.00 65.00 15.00 30.00 1,140.00 1.50

69 13.60 60.00 70.00 10.00 20.00 1,160.00 1.00

70 13.80 50.00 60.00 10.00 20.00 1,180.00 1.00

71 14.00 45.00 50.00 5.00 10.00 1,190.00 0.50

72 14.20 50.00 60.00 10.00 20.00 1,210.00 1.00

73 14.40 50.00 65.00 15.00 30.00 1,240.00 1.50

74 14.60 65.00 75.00 10.00 20.00 1,260.00 1.00

Page 3: Sondir RitZone BSD

LABORATORIUM MEKANIKA TANAHJURUSAN TEKNIK SIPIL, FAKULTAS TEKNIKUNIVERSITAS SEBELAS MARETJl. Ir. Sutami 36 a, Surakarta, Telp (0271)7012979, (0271) 647069 psw. 219, Fax: 634524

S O N D I RNama Proyek : Pembangunan Rusunawa UNY Titik no. : S1Lokasi Proyek : Wates, DIY Analisis : GoptaTanggal Pengujian : 29/07/2009Dikerjakan oleh : Subur

75 14.80 40.00 60.00 20.00 40.00 1,300.00 2.00

76 15.00 55.00 65.00 10.00 20.00 1,320.00 1.00

77 15.20 75.00 90.00 15.00 30.00 1,350.00 1.50

78 15.40 130.00 150.00 20.00 40.00 1,390.00 2.00

79 15.60 135.00 140.00 5.00 10.00 1,400.00 0.50

80 15.80 140.00 150.00 10.00 20.00 1,420.00 1.00

81 16.00 140.00 150.00 10.00 20.00 1,440.00 1.00

82 16.20 170.00 180.00 10.00 20.00 1,460.00 1.00

83 16.40 150.00 160.00 10.00 20.00 1,480.00 1.00

84 16.60 130.00 140.00 10.00 20.00 1,500.00 1.00

85 16.80 125.00 135.00 10.00 20.00 1,520.00 1.00

86 17.00 120.00 130.00 10.00 20.00 1,540.00 1.00

87 17.20 100.00 120.00 20.00 40.00 1,580.00 2.00

88 17.40 80.00 100.00 20.00 40.00 1,620.00 2.00

89 17.60 100.00 110.00 10.00 20.00 1,640.00 1.00

90 17.80 100.00 110.00 10.00 20.00 1,660.00 1.00

91 18.00 85.00 100.00 15.00 30.00 1,690.00 1.50

92 18.20 85.00 100.00 15.00 30.00 1,720.00 1.50

93 18.40 80.00 100.00 20.00 40.00 1,760.00 2.00

94 18.60 130.00 140.00 10.00 20.00 1,780.00 1.00

95 18.80 170.00 180.00 10.00 20.00 1,800.00 1.00

96 19.00 180.00 190.00 10.00 20.00 1,820.00 1.00

97 19.20 185.00 200.00 15.00 30.00 1,850.00 1.50

98 19.40 160.00 175.00 15.00 30.00 1,880.00 1.50

99 19.60 180.00 190.00 10.00 20.00 1,900.00 1.00

100 19.80 180.00 190.00 10.00 20.00 1,920.00 1.00

101 20.00 140.00 150.00 10.00 20.00 1.00

Page 4: Sondir RitZone BSD

LABORATORIUM MEKANIKA TANAHJURUSAN TEKNIK SIPIL, FAKULTAS TEKNIKUNIVERSITAS SEBELAS MARETJl. Ir. Sutami 36 a, Surakarta, Telp (0271)7012979, (0271) 647069 psw. 219, Fax: 634524

S O N D I RNama Proyek : Pembangunan Rusunawa UNY Titik no. : S1Lokasi Proyek : Wates, DIY Analisis : GoptaTanggal Pengujian : 29/07/2009Dikerjakan oleh : Subur

- 50.00 100.00 150.00 200.00 250.00 300.00

-

1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

9.00

10.00

11.00

12.00

13.00

14.00

15.00

16.00

17.00

18.00

19.00

20.00

conus (kg/cm2)

local fric tion *10 (kg/cm2)

total fric tion/10 (kg/cm)

De

pth

(m

)

Page 5: Sondir RitZone BSD

LABORATORIUM MEKANIKA TANAHJURUSAN TEKNIK SIPIL, FAKULTAS TEKNIKUNIVERSITAS SEBELAS MARETJl. Ir. Sutami 36 a, Surakarta, Telp (0271)7012979, (0271) 647069 psw. 219, Fax: 634524

S O N D I RNama Proyek : Pembangunan Rusunawa UNY Titik no. : S1Lokasi Proyek : Wates, DIY Analisis : GoptaTanggal Pengujian : 29/07/2009Dikerjakan oleh : Subur

- 50.00 100.00 150.00 200.00 250.00 300.00

-

1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

9.00

10.00

11.00

12.00

13.00

14.00

15.00

16.00

17.00

18.00

19.00

20.00

conus (kg/cm2)

local fric tion *10 (kg/cm2)

total fric tion/10 (kg/cm)

De

pth

(m

)

Page 6: Sondir RitZone BSD

Fr Local Total ANALISIS KDD IJINfs/qc Friction Friction

Kedalaman (m)qc (kg/cm2)Sand

(kg/cm) Menerus (to Bujur sangkar0 - - 1.96 2.47

#DIV/0! - - 0.20 - 1.96 2.47#DIV/0! - - 0.40 - 1.96 2.47

- - - 0.60 10.00 4.64 7.11 0.300 15.00 3.00 0.80 5.00 3.31 4.80 0.400 20.00 7.00 1.00 5.00 3.31 4.80 0.200 10.00 9.00 1.20 5.00 3.31 4.80

#DIV/0! 10.00 11.00 1.40 - 1.96 2.47#DIV/0! 5.00 12.00 1.60 - 1.96 2.47#DIV/0! 5.00 13.00 1.80 - 1.96 2.47#DIV/0! - 13.00 2.00 - 1.96 2.47#DIV/0! 5.00 14.00 2.20 - 1.96 2.47#DIV/0! 5.00 15.00 2.40 - 1.96 2.47#DIV/0! 5.00 16.00 2.60 - 1.96 2.47#DIV/0! 5.00 17.00 2.80 - 1.96 2.47#DIV/0! 5.00 18.00 3.00 - 1.96 2.47#DIV/0! 5.00 19.00 3.20 - 1.96 2.47#DIV/0! 5.00 20.00 3.40 - 1.96 2.47#DIV/0! 5.00 21.00 3.60 - 1.96 2.47#DIV/0! 10.00 23.00 3.80 - 1.96 2.47

0.100 5.00 24.00 4.00 5.00 3.31 4.80 0.100 5.00 25.00 4.20 5.00 3.31 4.80

#DIV/0! 5.00 26.00 4.40 - 1.96 2.47#DIV/0! 5.00 27.00 4.60 - 1.96 2.47#DIV/0! 10.00 29.00 4.80 - 1.96 2.47#DIV/0! 10.00 31.00 5.00 - 1.96 2.47

0.300 15.00 34.00 5.20 5.00 3.31 4.80 0.300 15.00 37.00 5.40 5.00 3.31 4.80 0.100 10.00 39.00 5.60 10.00 4.64 7.11 0.100 10.00 41.00 5.80 10.00 4.64 7.11 0.100 10.00 43.00 6.00 10.00 4.64 7.11

#DIV/0! 5.00 44.00 6.20 - 1.96 2.47#DIV/0! - 44.00 6.40 - 1.96 2.47#DIV/0! - 44.00 6.60 - 1.96 2.47#DIV/0! 5.00 45.00 6.80 - 1.96 2.47

Page 7: Sondir RitZone BSD

0.200 10.00 47.00 7.00 5.00 3.31 4.80 0.100 10.00 49.00 7.20 10.00 4.64 7.11 0.150 15.00 52.00 7.40 10.00 4.64 7.11 0.150 15.00 55.00 7.60 10.00 4.64 7.11 0.150 15.00 58.00 7.80 10.00 4.64 7.11 0.150 15.00 61.00 8.00 10.00 4.64 7.11 0.100 5.00 62.00 8.20 5.00 3.31 4.80 0.300 15.00 65.00 8.40 5.00 3.31 4.80 0.100 10.00 67.00 8.60 10.00 4.64 7.11 0.100 10.00 69.00 8.80 10.00 4.64 7.11 0.100 10.00 71.00 9.00 10.00 4.64 7.11 0.100 10.00 73.00 9.20 10.00 4.64 7.11 0.200 10.00 75.00 9.40 5.00 3.31 4.80 0.200 10.00 77.00 9.60 5.00 3.31 4.80 0.200 10.00 79.00 9.80 5.00 3.31 4.80 0.200 10.00 81.00 10.00 5.00 3.31 4.80

#DIV/0! 5.00 82.00 10.20 - 1.96 2.47#DIV/0! 5.00 83.00 10.40 - 1.96 2.47

0.100 5.00 84.00 10.60 5.00 3.31 4.80 0.100 5.00 85.00 10.80 5.00 3.31 4.80 0.067 10.00 87.00 11.00 15.00 5.96 9.40 0.050 10.00 89.00 11.20 20.00 7.27 11.66 0.033 10.00 91.00 11.40 30.00 9.86 16.14 0.040 10.00 93.00 11.60 25.00 8.57 13.91 0.040 10.00 95.00 11.80 25.00 8.57 13.91 0.075 15.00 98.00 12.00 20.00 7.27 11.66 0.133 20.00 102.00 12.20 15.00 5.96 9.40 0.017 5.00 103.00 12.40 30.00 9.86 16.14 0.013 5.00 104.00 12.60 40.00 12.40 20.54 0.020 10.00 106.00 12.80 50.00 14.89 24.85 0.020 10.00 108.00 13.00 50.00 14.89 24.85 0.030 15.00 111.00 13.20 50.00 14.89 24.85 0.030 15.00 114.00 13.40 50.00 14.89 24.85 0.017 10.00 116.00 13.60 60.00 17.33 29.07 0.020 10.00 118.00 13.80 50.00 14.89 24.85 0.011 5.00 119.00 14.00 45.00 13.65 22.70 0.020 10.00 121.00 14.20 50.00 14.89 24.85 0.030 15.00 124.00 14.40 50.00 14.89 24.85 0.015 10.00 126.00 14.60 65.00 18.53 31.16

Page 8: Sondir RitZone BSD

0.050 20.00 130.00 14.80 40.00 12.40 20.54 0.018 10.00 132.00 15.00 55.00 16.12 26.97 0.020 15.00 135.00 15.20 75.00 20.90 35.25 0.015 20.00 139.00 15.40 130.00 32.95 56.10 0.004 5.00 140.00 15.60 135.00 33.96 57.85 0.007 10.00 142.00 15.80 140.00 34.95 59.57 0.007 10.00 144.00 16.00 140.00 34.95 59.57 0.006 10.00 146.00 16.20 170.00 40.58 69.32 0.007 10.00 148.00 16.40 150.00 36.89 62.93 0.008 10.00 150.00 16.60 130.00 32.95 56.10 0.008 10.00 152.00 16.80 125.00 31.92 54.33 0.008 10.00 154.00 17.00 120.00 30.88 52.53 0.020 20.00 158.00 17.20 100.00 26.58 45.09 0.025 20.00 162.00 17.40 80.00 22.06 37.26 0.010 10.00 164.00 17.60 100.00 26.58 45.09 0.010 10.00 166.00 17.80 100.00 26.58 45.09 0.018 15.00 169.00 18.00 85.00 23.21 39.25 0.018 15.00 172.00 18.20 85.00 23.21 39.25 0.025 20.00 176.00 18.40 80.00 22.06 37.26 0.008 10.00 178.00 18.60 130.00 32.95 56.10 0.006 10.00 180.00 18.80 170.00 40.58 69.32 0.006 10.00 182.00 19.00 180.00 42.33 72.34 0.008 15.00 185.00 19.20 185.00 43.17 73.80 0.009 15.00 188.00 19.40 160.00 38.77 66.18 0.006 10.00 190.00 19.60 180.00 42.33 72.34 0.006 10.00 192.00 19.80 180.00 42.33 72.34 0.007 10.00 20.00 140.00 34.95 59.57

Page 9: Sondir RitZone BSD

H qc0 04 5

6.2 09 10

10.2 011.4 30

15 5516.2 17017.4 8019.2 185

20 140

H qc' qc0 0 04 2.5 2.5

6.2 -2.5 09 5 5

10.2 -5 011.4 15 15

15 12.5 27.516.2 57.5 8517.4 -45 4019.2 52.5 92.5

20 -22.5 70

Page 10: Sondir RitZone BSD
Page 11: Sondir RitZone BSD

ANALISIS KDD IJINClay

Kedalaman (m)qc (kg/cm2)Kapasitas daya dukung ijin

Menerus (ton Bujur sangkar(ton/m2) Menerus (ton/m2) Bujursangkar (ton/m4.00 10.00 0.00 - 3.20 1.56 2.30 3.054.00 10.00 3.20 - 5.20 1.00 2.18 2.844.00 10.00 1.56 5.20 - 5.80 6.67 3.39 4.959.60 16.80 5.80 - 7.20 3.57 2.73 3.806.80 13.40 7.2 10.00 4.11 6.196.80 13.406.80 13.404.00 10.004.00 10.004.00 10.004.00 10.004.00 10.004.00 10.004.00 10.004.00 10.004.00 10.004.00 10.004.00 10.004.00 10.004.00 10.00 1.00 6.80 13.406.80 13.404.00 10.004.00 10.004.00 10.004.00 10.006.80 13.406.80 13.40 6.67 9.60 16.809.60 16.809.60 16.804.00 10.004.00 10.00 3.57 4.00 10.004.00 10.00

Page 12: Sondir RitZone BSD

6.80 13.40 10.00 9.60 16.809.60 16.80 10.00 9.60 16.809.60 16.80 10.00 9.60 16.806.80 13.40 5.00 6.80 13.409.60 16.80 10.00 9.60 16.809.60 16.80 10.00 9.60 16.806.80 13.40 5.00 6.80 13.406.80 13.406.80 13.40 - 4.00 10.004.00 10.00 5.00 6.80 13.406.80 13.40 15.00

12.40 20.2015.20 23.60 30.00 20.80 30.4018.00 27.00 25.00 18.00 27.0015.20 23.60 15.00 12.40 20.2020.80 30.40 40.00 26.40 37.2032.00 44.00 50.00 32.00 44.0032.00 44.00 50.00 32.00 44.0037.60 50.80 50.00 32.00 44.0029.20 40.60 50.00 32.00 44.0032.00 44.00 65.00 40.40 54.20

Page 13: Sondir RitZone BSD

26.40 37.20 55.00 34.80 47.4046.00 61.00 130.00 76.80 98.4079.60 101.8082.40 105.20 140.00 82.40 105.2099.20 125.60 150.00 88.00 112.0076.80 98.40 125.00 74.00 95.0071.20 91.60 100.00 60.00 78.0048.80 64.40 100.00 60.00 78.0060.00 78.00 85.00 51.60 67.8051.60 67.80 80.00 48.80 64.4076.80 98.40 170.00 99.20 125.60

104.80 132.40 185.00 107.60 135.8093.60 118.80

104.80 132.40 180.00 104.80 132.4082.40 105.20 #DIV/0!

Page 14: Sondir RitZone BSD
Page 15: Sondir RitZone BSD
Page 16: Sondir RitZone BSD

Sumuran (ton/m2) Kepadatan 0.39 Tanah Lepas - 0.25 Padat Sedang - - 1.67 Padat - - 0.89 Sangat Padat 2.50 Tanah Keras

Page 17: Sondir RitZone BSD
Page 18: Sondir RitZone BSD
Page 19: Sondir RitZone BSD
Page 20: Sondir RitZone BSD
Page 21: Sondir RitZone BSD

LABORATORIUM MEKANIKA TANAHJURUSAN TEKNIK SIPIL, FAKULTAS TEKNIKUNIVERSITAS SEBELAS MARETJl. Ir. Sutami 36 a, Surakarta, Telp (0271)7012979, (0271) 647069 psw. 219, Fax: 634524

S O N D I RNama Proyek : Pembangunan Rusunawa UNY Titik no. : S2Lokasi Proyek : Wates, DIY Analisis : GoptaTanggal Pengujian : 29/07/2009Dikerjakan oleh : Subur

Conus Biconus Friction HL = Total Local No. Depth (H) Friction

(m) (kg/cm) (kg/cm) (kg/cm)1 - - ### - - -

2 0.20 0.00 0.00 0.00 0.00 0.00 0.00

3 0.40 0.00 0.00 - 0.00 0.00 0.00

4 0.60 0.00 0.00 - 0.00 0.00 0.00

5 0.80 0.00 0.00 - - - -

6 1.00 0.00 0.00 - - - -

7 1.20 0.00 5.00 5.00 10.00 10.00 0.50

8 1.40 0.00 10.00 10.00 20.00 30.00 1.00

9 1.60 0.00 10.00 10.00 20.00 50.00 1.00

10 1.80 5.00 15.00 10.00 20.00 70.00 1.00

11 2.00 5.00 15.00 10.00 20.00 90.00 1.00

12 2.20 0.00 10.00 10.00 20.00 110.00 1.00

13 2.40 0.00 5.00 5.00 10.00 120.00 0.50

14 2.60 0.00 5.00 5.00 10.00 130.00 0.50

15 2.80 0.00 5.00 5.00 10.00 140.00 0.50

16 3.00 5.00 10.00 5.00 10.00 150.00 0.50

17 3.20 10.00 15.00 5.00 10.00 160.00 0.50

18 3.40 0.00 5.00 5.00 10.00 170.00 0.50

19 3.60 0.00 5.00 5.00 10.00 180.00 0.50

20 3.80 0.00 5.00 5.00 10.00 190.00 0.50

21 4.00 0.00 5.00 5.00 10.00 200.00 0.50

22 4.20 5.00 10.00 5.00 10.00 210.00 0.50

23 4.40 5.00 10.00 5.00 10.00 220.00 0.50

24 4.60 5.00 15.00 10.00 20.00 240.00 1.00

25 4.80 10.00 20.00 10.00 20.00 260.00 1.00

26 5.00 10.00 20.00 10.00 20.00 280.00 1.00

27 5.20 5.00 15.00 10.00 20.00 300.00 1.00

28 5.40 5.00 15.00 10.00 20.00 320.00 1.00

29 5.60 5.00 10.00 5.00 10.00 330.00 0.50

30 5.80 5.00 15.00 10.00 20.00 350.00 1.00

31 6.00 5.00 15.00 10.00 20.00 370.00 1.00

32 6.20 5.00 10.00 5.00 10.00 380.00 0.50

33 6.40 5.00 10.00 5.00 10.00 390.00 0.50

34 6.60 5.00 10.00 5.00 10.00 400.00 0.50

35 6.80 5.00 15.00 10.00 20.00 420.00 1.00

36 7.00 5.00 15.00 10.00 20.00 440.00 1.00

37 7.20 10.00 20.00 10.00 20.00 460.00 1.00

38 7.40 10.00 25.00 15.00 30.00 490.00 1.50

39 7.60 10.00 20.00 10.00 20.00 510.00 1.00

40 7.80 10.00 20.00 10.00 20.00 530.00 1.00

41 8.00 10.00 20.00 10.00 20.00 550.00 1.00

42 8.20 5.00 10.00 5.00 10.00 560.00 0.50

43 8.40 5.00 15.00 10.00 20.00 580.00 1.00

( qc ) (q

f) (H-q

c)xD/A HT = HL

(kg/cm2) (kg/cm2) (kg/cm2)

Page 22: Sondir RitZone BSD

LABORATORIUM MEKANIKA TANAHJURUSAN TEKNIK SIPIL, FAKULTAS TEKNIKUNIVERSITAS SEBELAS MARETJl. Ir. Sutami 36 a, Surakarta, Telp (0271)7012979, (0271) 647069 psw. 219, Fax: 634524

S O N D I RNama Proyek : Pembangunan Rusunawa UNY Titik no. : S2Lokasi Proyek : Wates, DIY Analisis : GoptaTanggal Pengujian : 29/07/2009Dikerjakan oleh : Subur

44 8.60 10.00 20.00 10.00 20.00 600.00 1.00

45 8.80 10.00 20.00 10.00 20.00 620.00 1.00

46 9.00 15.00 25.00 10.00 20.00 640.00 1.00

47 9.20 10.00 15.00 5.00 10.00 650.00 0.50

48 9.40 10.00 15.00 5.00 10.00 660.00 0.50

49 9.60 10.00 15.00 5.00 10.00 670.00 0.50

50 9.80 5.00 10.00 5.00 10.00 680.00 0.50

51 10.00 5.00 10.00 5.00 10.00 690.00 0.50

52 10.20 5.00 15.00 10.00 20.00 710.00 1.00

53 10.40 5.00 15.00 10.00 20.00 730.00 1.00

54 10.60 10.00 25.00 15.00 30.00 760.00 1.50

55 10.80 15.00 30.00 15.00 30.00 790.00 1.50

56 11.00 20.00 30.00 10.00 20.00 810.00 1.00

57 11.20 25.00 30.00 5.00 10.00 820.00 0.50

58 11.40 25.00 35.00 10.00 20.00 840.00 1.00

59 11.60 30.00 40.00 10.00 20.00 860.00 1.00

60 11.80 35.00 45.00 10.00 20.00 880.00 1.00

61 12.00 35.00 50.00 15.00 30.00 910.00 1.50

62 12.20 45.00 60.00 15.00 30.00 940.00 1.50

63 12.40 50.00 65.00 15.00 30.00 970.00 1.50

64 12.60 50.00 65.00 15.00 30.00 1,000.00 1.50

65 12.80 95.00 100.00 5.00 10.00 1,010.00 0.50

66 13.00 60.00 85.00 25.00 50.00 1,060.00 2.50

67 13.20 45.00 55.00 10.00 20.00 1,080.00 1.00

68 13.40 45.00 55.00 10.00 20.00 1,100.00 1.00

69 13.60 55.00 75.00 20.00 40.00 1,140.00 2.00

70 13.80 90.00 100.00 10.00 20.00 1,160.00 1.00

71 14.00 45.00 65.00 20.00 40.00 1,200.00 2.00

72 14.20 75.00 90.00 15.00 30.00 1,230.00 1.50

73 14.40 70.00 80.00 10.00 20.00 1,250.00 1.00

74 14.60 100.00 120.00 20.00 40.00 1,290.00 2.00

75 14.80 80.00 100.00 20.00 40.00 1,330.00 2.00

76 15.00 85.00 110.00 25.00 50.00 1,380.00 2.50

77 15.20 85.00 100.00 15.00 30.00 1,410.00 1.50

78 15.40 100.00 120.00 20.00 40.00 1,450.00 2.00

79 15.60 135.00 150.00 15.00 30.00 1,480.00 1.50

80 15.80 200.00 215.00 15.00 30.00 1,510.00 1.50

81 16.00 250.00

Page 23: Sondir RitZone BSD

LABORATORIUM MEKANIKA TANAHJURUSAN TEKNIK SIPIL, FAKULTAS TEKNIKUNIVERSITAS SEBELAS MARETJl. Ir. Sutami 36 a, Surakarta, Telp (0271)7012979, (0271) 647069 psw. 219, Fax: 634524

S O N D I RNama Proyek : Pembangunan Rusunawa UNY Titik no. : S2Lokasi Proyek : Wates, DIY Analisis : GoptaTanggal Pengujian : 29/07/2009Dikerjakan oleh : Subur

- 50.00 100.00 150.00 200.00 250.00 300.00

-

1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

9.00

10.00

11.00

12.00

13.00

14.00

15.00

16.00

17.00

18.00

19.00

20.00

conus (kg/cm2)

local fric tion *10 (kg/cm2)

total fric tion/10 (kg/cm)

De

pth

(m

)

Page 24: Sondir RitZone BSD

LABORATORIUM MEKANIKA TANAHJURUSAN TEKNIK SIPIL, FAKULTAS TEKNIKUNIVERSITAS SEBELAS MARETJl. Ir. Sutami 36 a, Surakarta, Telp (0271)7012979, (0271) 647069 psw. 219, Fax: 634524

S O N D I RNama Proyek : Pembangunan Rusunawa UNY Titik no. : S2Lokasi Proyek : Wates, DIY Analisis : GoptaTanggal Pengujian : 29/07/2009Dikerjakan oleh : Subur

- 50.00 100.00 150.00 200.00 250.00 300.00

-

1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

9.00

10.00

11.00

12.00

13.00

14.00

15.00

16.00

17.00

18.00

19.00

20.00

conus (kg/cm2)

local fric tion *10 (kg/cm2)

total fric tion/10 (kg/cm)

De

pth

(m

)

Page 25: Sondir RitZone BSD

Fr Local Total ANALISIS KDD IJINfs/qc Friction Friction

Kedalaman (m)qc (kg/cm2)Sand

(kg/cm) Menerus (to0 - - 1.96

#DIV/0! - - 0.20 - 1.96#DIV/0! - - 0.40 - 1.96#DIV/0! - - 0.60 - 1.96#DIV/0! - - 0.80 - 1.96#DIV/0! - - 1.00 - 1.96#DIV/0! 5.00 1.00 1.20 - 1.96#DIV/0! 10.00 3.00 1.40 - 1.96#DIV/0! 10.00 5.00 1.60 - 1.96

0.200 10.00 7.00 1.80 5.00 3.31 0.200 10.00 9.00 2.00 5.00 3.31

#DIV/0! 10.00 11.00 2.20 - 1.96#DIV/0! 5.00 12.00 2.40 - 1.96#DIV/0! 5.00 13.00 2.60 - 1.96#DIV/0! 5.00 14.00 2.80 - 1.96

0.100 5.00 15.00 3.00 5.00 3.31 0.050 5.00 16.00 3.20 10.00 4.64

#DIV/0! 5.00 17.00 3.40 - 1.96#DIV/0! 5.00 18.00 3.60 - 1.96#DIV/0! 5.00 19.00 3.80 - 1.96#DIV/0! 5.00 20.00 4.00 - 1.96

0.100 5.00 21.00 4.20 5.00 3.31 0.100 5.00 22.00 4.40 5.00 3.31 0.200 10.00 24.00 4.60 5.00 3.31 0.100 10.00 26.00 4.80 10.00 4.64 0.100 10.00 28.00 5.00 10.00 4.64 0.200 10.00 30.00 5.20 5.00 3.31 0.200 10.00 32.00 5.40 5.00 3.31 0.100 5.00 33.00 5.60 5.00 3.31 0.200 10.00 35.00 5.80 5.00 3.31 0.200 10.00 37.00 6.00 5.00 3.31 0.100 5.00 38.00 6.20 5.00 3.31 0.100 5.00 39.00 6.40 5.00 3.31 0.100 5.00 40.00 6.60 5.00 3.31 0.200 10.00 42.00 6.80 5.00 3.31 0.200 10.00 44.00 7.00 5.00 3.31 0.100 10.00 46.00 7.20 10.00 4.64 0.150 15.00 49.00 7.40 10.00 4.64 0.100 10.00 51.00 7.60 10.00 4.64 0.100 10.00 53.00 7.80 10.00 4.64 0.100 10.00 55.00 8.00 10.00 4.64 0.100 5.00 56.00 8.20 5.00 3.31 0.200 10.00 58.00 8.40 5.00 3.31

Page 26: Sondir RitZone BSD

0.100 10.00 60.00 8.60 10.00 4.64 0.100 10.00 62.00 8.80 10.00 4.64 0.067 10.00 64.00 9.00 15.00 5.96 0.050 5.00 65.00 9.20 10.00 4.64 0.050 5.00 66.00 9.40 10.00 4.64 0.050 5.00 67.00 9.60 10.00 4.64 0.100 5.00 68.00 9.80 5.00 3.31 0.100 5.00 69.00 10.00 5.00 3.31 0.200 10.00 71.00 10.20 5.00 3.31 0.200 10.00 73.00 10.40 5.00 3.31 0.150 15.00 76.00 10.60 10.00 4.64 0.100 15.00 79.00 10.80 15.00 5.96 0.050 10.00 81.00 11.00 20.00 7.27 0.020 5.00 82.00 11.20 25.00 8.57 0.040 10.00 84.00 11.40 25.00 8.57 0.033 10.00 86.00 11.60 30.00 9.86 0.029 10.00 88.00 11.80 35.00 11.14 0.043 15.00 91.00 12.00 35.00 11.14 0.033 15.00 94.00 12.20 45.00 13.65 0.030 15.00 97.00 12.40 50.00 14.89 0.030 15.00 100.00 12.60 50.00 14.89 0.005 5.00 101.00 12.80 95.00 25.47 0.042 25.00 106.00 13.00 60.00 17.33 0.022 10.00 108.00 13.20 45.00 13.65 0.022 10.00 110.00 13.40 45.00 13.65 0.036 20.00 114.00 13.60 55.00 16.12 0.011 10.00 116.00 13.80 90.00 24.35 0.044 20.00 120.00 14.00 45.00 13.65 0.020 15.00 123.00 14.20 75.00 20.90 0.014 10.00 125.00 14.40 70.00 19.72 0.020 20.00 129.00 14.60 100.00 26.58 0.025 20.00 133.00 14.80 80.00 22.06 0.029 25.00 138.00 15.00 85.00 23.21 0.018 15.00 141.00 15.20 85.00 23.21 0.020 20.00 145.00 15.40 100.00 26.58 0.011 15.00 148.00 15.60 135.00 33.96 0.008 15.00 151.00 15.80 200.00 45.60

16.00 250.00 52.32

Page 27: Sondir RitZone BSD

H qc0 0

3.2 107 59 15

10.4 512.8 9513.2 4515.2 85

16 250

H qc' qc0 0 0

3.2 5 57 -2.5 2.59 5 7.5

10.4 -5 2.512.8 45 47.513.2 -25 22.515.2 20 42.5

16 82.5 125

Page 28: Sondir RitZone BSD
Page 29: Sondir RitZone BSD

ANALISIS KDD IJINSand Clay

Kedalaman (m)qc (kg/cm2)Kapasitas daya dukung ijin

Bujur sangkarMenerus (ton Bujur sangkar(ton/m2) Menerus (t Bujursangk2.47 4.00 10.00 0.00 - 3.00 0.67 2.10 2.722.47 4.00 10.00 0.67 3.00 - 3.80 3.75 2.77 3.872.47 4.00 10.00 3.80 - 4.80 3.00 2.61 3.592.47 4.00 10.00 4.80 - 5.00 10.00 4.11 6.192.47 4.00 10.00 5.00 - 6.40 5.71 3.19 4.602.47 4.00 10.00 6.40 - 1.96 2.472.47 4.00 10.002.47 4.00 10.002.47 4.00 10.004.80 6.80 13.404.80 6.80 13.402.47 4.00 10.002.47 4.00 10.002.47 4.00 10.002.47 4.00 10.004.80 6.80 13.407.11 9.60 16.80 3.75 2.47 4.00 10.002.47 4.00 10.002.47 4.00 10.002.47 4.00 10.00 3.00 4.80 6.80 13.404.80 6.80 13.404.80 6.80 13.407.11 9.60 16.80 10.00 7.11 9.60 16.804.80 6.80 13.40 5.71 4.80 6.80 13.404.80 6.80 13.404.80 6.80 13.404.80 6.80 13.404.80 6.80 13.404.80 6.80 13.404.80 6.80 13.404.80 6.80 13.404.80 6.80 13.407.11 9.60 16.807.11 9.60 16.807.11 9.60 16.807.11 9.60 16.807.11 9.60 16.804.80 6.80 13.404.80 6.80 13.40

Page 30: Sondir RitZone BSD

7.11 9.60 16.807.11 9.60 16.809.40 12.40 20.207.11 9.60 16.807.11 9.60 16.807.11 9.60 16.804.80 6.80 13.404.80 6.80 13.404.80 6.80 13.404.80 6.80 13.407.11 9.60 16.809.40 12.40 20.2011.66 15.20 23.6013.91 18.00 27.0013.91 18.00 27.0016.14 20.80 30.4018.35 23.60 33.8018.35 23.60 33.8022.70 29.20 40.6024.85 32.00 44.0024.85 32.00 44.0043.17 57.20 74.6029.07 37.60 50.8022.70 29.20 40.6022.70 29.20 40.6026.97 34.80 47.4041.22 54.40 71.2022.70 29.20 40.6035.25 46.00 61.0033.21 43.20 57.6045.09 60.00 78.0037.26 48.80 64.4039.25 51.60 67.8039.25 51.60 67.8045.09 60.00 78.0057.85 79.60 101.8078.00 116.00 146.0089.64 144.00 180.00

Page 31: Sondir RitZone BSD
Page 32: Sondir RitZone BSD
Page 33: Sondir RitZone BSD

Kapasitas daya dukung ijin

Sumuran (tKepadatan 0.17 Tanah Lep - 0.94 Padat - - 0.75 Padat Sed - - 2.50 Padat - - 1.43 Sangat Padat - Tanah Keras

Page 34: Sondir RitZone BSD
Page 35: Sondir RitZone BSD
Page 36: Sondir RitZone BSD
Page 37: Sondir RitZone BSD

LABORATORIUM MEKANIKA TANAHJURUSAN TEKNIK SIPIL, FAKULTAS TEKNIK

UNIVERSITAS SEBELAS MARETJl. Ir. Sutami 36 a, Surakarta, Telp (0271)7012979, (0271) 647069 psw. 219, Fax: 634524

S O N D I RNama Proyek : Pembangunan Rusunawa UNY Titik no. : S3Lokasi Proyek : Wates, DIY Analisis : GoptaTanggal Pengujian : 29/07/2009Dikerjakan oleh : Subur

Conus Biconus Friction HL = Total Local No. Depth (H) Friction

(m) (kg/cm) (kg/cm) (kg/cm)1 - - ### - - -

2 0.20 0.00 0.00 0.00 0.00 0.00 0.00

3 0.40 0.00 0.00 0.00 0.00 0.00 0.00

4 0.60 0.00 5.00 5.00 10.00 10.00 0.50

5 0.80 0.00 5.00 5.00 10.00 20.00 0.50

6 1.00 0.00 5.00 5.00 10.00 30.00 0.50

7 1.20 5.00 10.00 0.00 0.00 30.00 0.00

8 1.40 5.00 10.00 0.00 0.00 30.00 0.00

9 1.60 0.00 5.00 0.00 0.00 30.00 0.00

10 1.80 0.00 5.00 5.00 10.00 40.00 0.50

11 2.00 0.00 5.00 5.00 10.00 50.00 0.50

12 2.20 5.00 15.00 10.00 20.00 70.00 1.00

13 2.40 5.00 15.00 10.00 20.00 90.00 1.00

14 2.60 0.00 5.00 5.00 10.00 100.00 0.50

15 2.80 0.00 5.00 5.00 10.00 110.00 0.50

16 3.00 0.00 5.00 5.00 10.00 120.00 0.50

17 3.20 5.00 10.00 5.00 10.00 130.00 0.50

18 3.40 0.00 5.00 5.00 10.00 140.00 0.50

19 3.60 0.00 5.00 5.00 10.00 150.00 0.50

20 3.80 0.00 5.00 5.00 10.00 160.00 0.50

21 4.00 5.00 10.00 5.00 10.00 170.00 0.50

22 4.20 5.00 10.00 5.00 10.00 180.00 0.50

23 4.40 5.00 10.00 5.00 10.00 190.00 0.50

24 4.60 5.00 15.00 10.00 20.00 210.00 1.00

25 4.80 10.00 20.00 10.00 20.00 230.00 1.00

26 5.00 10.00 25.00 15.00 30.00 260.00 1.50

27 5.20 5.00 15.00 10.00 20.00 280.00 1.00

28 5.40 5.00 15.00 10.00 20.00 300.00 1.00

29 5.60 15.00 20.00 5.00 10.00 310.00 0.50

30 5.80 15.00 20.00 5.00 10.00 320.00 0.50

31 6.00 10.00 20.00 10.00 20.00 340.00 1.00

32 6.20 5.00 10.00 5.00 10.00 350.00 0.50

33 6.40 5.00 10.00 5.00 10.00 360.00 0.50

34 6.60 5.00 15.00 10.00 20.00 380.00 1.00

35 6.80 15.00 25.00 10.00 20.00 400.00 1.00

36 7.00 15.00 25.00 10.00 20.00 420.00 1.00

37 7.20 10.00 30.00 20.00 40.00 460.00 2.00

38 7.40 15.00 35.00 20.00 40.00 500.00 2.00

39 7.60 25.00 40.00 15.00 30.00 530.00 1.50

40 7.80 25.00 40.00 15.00 30.00 560.00 1.50

41 8.00 25.00 40.00 15.00 30.00 590.00 1.50

42 8.20 15.00 35.00 20.00 40.00 630.00 2.00

43 8.40 15.00 30.00 15.00 30.00 660.00 1.50

( qc ) (q

f) (H-q

c)xD/A HT = HL

(kg/cm2) (kg/cm2) (kg/cm2)

Page 38: Sondir RitZone BSD

LABORATORIUM MEKANIKA TANAHJURUSAN TEKNIK SIPIL, FAKULTAS TEKNIK

UNIVERSITAS SEBELAS MARETJl. Ir. Sutami 36 a, Surakarta, Telp (0271)7012979, (0271) 647069 psw. 219, Fax: 634524

S O N D I RNama Proyek : Pembangunan Rusunawa UNY Titik no. : S3Lokasi Proyek : Wates, DIY Analisis : GoptaTanggal Pengujian : 29/07/2009Dikerjakan oleh : Subur

44 8.60 15.00 30.00 15.00 30.00 690.00 1.50

45 8.80 15.00 35.00 20.00 40.00 730.00 2.00

46 9.00 15.00 35.00 20.00 40.00 770.00 2.00

47 9.20 20.00 40.00 20.00 40.00 810.00 2.00

48 9.40 25.00 40.00 15.00 30.00 840.00 1.50

49 9.60 25.00 40.00 15.00 30.00 870.00 1.50

50 9.80 25.00 40.00 15.00 30.00 900.00 1.50

51 10.00 25.00 40.00 15.00 30.00 930.00 1.50

52 10.20 30.00 45.00 15.00 30.00 960.00 1.50

53 10.40 30.00 45.00 15.00 30.00 990.00 1.50

54 10.60 35.00 50.00 15.00 30.00 1,020.00 1.50

55 10.80 45.00 55.00 10.00 20.00 1,040.00 1.00

56 11.00 45.00 55.00 10.00 20.00 1,060.00 1.00

57 11.20 45.00 65.00 20.00 40.00 1,100.00 2.00

58 11.40 50.00 65.00 15.00 30.00 1,130.00 1.50

59 11.60 60.00 75.00 15.00 30.00 1,160.00 1.50

60 11.80 45.00 60.00 15.00 30.00 1,190.00 1.50

61 12.00 50.00 65.00 15.00 30.00 1,220.00 1.50

62 12.20 30.00 50.00 20.00 40.00 1,260.00 2.00

63 12.40 55.00 80.00 25.00 50.00 1,310.00 2.50

64 12.60 60.00 85.00 25.00 50.00 1,360.00 2.50

65 12.80 65.00 90.00 25.00 50.00 1,410.00 2.50

66 13.00 80.00 100.00 20.00 40.00 1,450.00 2.00

67 13.20 95.00 120.00 25.00 50.00 1,500.00 2.50

68 13.40 100.00 125.00 25.00 50.00 1,550.00 2.50

69 13.60 100.00 125.00 25.00 50.00 1,600.00 2.50

70 13.80 110.00 130.00 20.00 40.00 1,640.00 2.00

71 14.00 120.00 140.00 20.00 40.00 1,680.00 2.00

72 14.20 135.00 160.00 25.00 50.00 1,730.00 2.50

73 14.40 150.00 175.00 25.00 50.00 1,780.00 2.50

74 14.60 150.00 165.00 15.00 30.00 1,810.00 1.50

75 14.80 145.00 165.00 20.00 40.00 1,850.00 2.00

76 15.00 150.00 175.00 25.00 50.00 1,900.00 2.50

77 15.20 185.00 200.00 15.00 30.00 1,930.00 1.50

78 15.40 200.00 220.00 20.00 40.00 1,970.00 2.00

79 15.60 160.00 185.00 25.00 50.00 2,020.00 2.50

80 15.80 195.00 210.00 15.00 30.00 2,050.00 1.50

81 16.00 195.00 210.00 15.00 30.00 2,080.00 1.50

82 16.20 185.00 200.00 15.00 30.00 2,110.00 1.50

83 16.40 130.00 165.00 35.00 70.00 2,180.00 3.50

84 16.60 180.00 215.00 35.00 70.00 2,250.00 3.50

85 16.80 200.00 230.00 30.00 60.00 2,310.00 3.00

86 17.00 200.00 225.00 25.00 50.00 2,360.00 2.50

87 17.20 180.00 200.00 20.00 40.00 2,400.00 2.00

88 17.40 175.00 190.00 15.00 30.00 2,430.00 1.50

89 17.60 155.00 180.00 25.00 50.00 2,480.00 2.50

90 17.80 150.00 165.00 15.00 30.00 2,510.00 1.50

Page 39: Sondir RitZone BSD

LABORATORIUM MEKANIKA TANAHJURUSAN TEKNIK SIPIL, FAKULTAS TEKNIK

UNIVERSITAS SEBELAS MARETJl. Ir. Sutami 36 a, Surakarta, Telp (0271)7012979, (0271) 647069 psw. 219, Fax: 634524

S O N D I RNama Proyek : Pembangunan Rusunawa UNY Titik no. : S3Lokasi Proyek : Wates, DIY Analisis : GoptaTanggal Pengujian : 29/07/2009Dikerjakan oleh : Subur

91 18.00 150.00 165.00 15.00 30.00 2,540.00 1.50

92 18.20 170.00 190.00 20.00 40.00 2,580.00 2.00

93 18.40 170.00 185.00 15.00 30.00 2,610.00 1.50

94 18.60 150.00 165.00 15.00 30.00 2,640.00 1.50

95 18.80 145.00 160.00 15.00 30.00 2,670.00 1.50

96 19.00 135.00 150.00 15.00 30.00 2,700.00 1.50

97 19.20 150.00 165.00 15.00 30.00 2,730.00 1.50

98 19.40 165.00 185.00 20.00 40.00 2,770.00 2.00

99 19.60 150.00 160.00 10.00 20.00 2,790.00 1.00

100 19.80 150.00 165.00 15.00 30.00 2,820.00 1.50

101 20.00 150.00 165.00 15.00 30.00 2,850.00 1.50

Page 40: Sondir RitZone BSD

LABORATORIUM MEKANIKA TANAHJURUSAN TEKNIK SIPIL, FAKULTAS TEKNIK

UNIVERSITAS SEBELAS MARETJl. Ir. Sutami 36 a, Surakarta, Telp (0271)7012979, (0271) 647069 psw. 219, Fax: 634524

S O N D I RNama Proyek : Pembangunan Rusunawa UNY Titik no. : S3Lokasi Proyek : Wates, DIY Analisis : GoptaTanggal Pengujian : 29/07/2009Dikerjakan oleh : Subur

- 50.00 100.00 150.00 200.00 250.00 300.00

-

1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

9.00

10.00

11.00

12.00

13.00

14.00

15.00

16.00

17.00

18.00

19.00

20.00

conus (kg/cm2)

local fric tion *10 (kg/cm2)

total fric tion/10 (kg/cm)

De

pth

(m

)

Page 41: Sondir RitZone BSD

LABORATORIUM MEKANIKA TANAHJURUSAN TEKNIK SIPIL, FAKULTAS TEKNIK

UNIVERSITAS SEBELAS MARETJl. Ir. Sutami 36 a, Surakarta, Telp (0271)7012979, (0271) 647069 psw. 219, Fax: 634524

S O N D I RNama Proyek : Pembangunan Rusunawa UNY Titik no. : S3Lokasi Proyek : Wates, DIY Analisis : GoptaTanggal Pengujian : 29/07/2009Dikerjakan oleh : Subur

- 50.00 100.00 150.00 200.00 250.00 300.00

-

1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

9.00

10.00

11.00

12.00

13.00

14.00

15.00

16.00

17.00

18.00

19.00

20.00

conus (kg/cm2)

local fric tion *10 (kg/cm2)

total fric tion/10 (kg/cm)

De

pth

(m

)

Page 42: Sondir RitZone BSD

1.2653

Fr Local Total ANALISIS KDD IJINfs/qc Friction Friction

Kedalaman (m)qc (kg/cm2)Sand

(kg/cm) Menerus (to0 - - 1.96

#DIV/0! - - 0.20 - 1.96#DIV/0! - - 0.40 - 1.96#DIV/0! 5.00 1.00 0.60 - 1.96#DIV/0! 5.00 2.00 0.80 - 1.96#DIV/0! 5.00 3.00 1.00 - 1.96

- - 3.00 1.20 5.00 3.31 - - 3.00 1.40 5.00 3.31

#DIV/0! - 3.00 1.60 - 1.96#DIV/0! 5.00 4.00 1.80 - 1.96#DIV/0! 5.00 5.00 2.00 - 1.96

0.200 10.00 7.00 2.20 5.00 3.31 0.200 10.00 9.00 2.40 5.00 3.31

#DIV/0! 5.00 10.00 2.60 - 1.96#DIV/0! 5.00 11.00 2.80 - 1.96#DIV/0! 5.00 12.00 3.00 - 1.96

0.100 5.00 13.00 3.20 5.00 3.31#DIV/0! 5.00 14.00 3.40 - 1.96#DIV/0! 5.00 15.00 3.60 - 1.96#DIV/0! 5.00 16.00 3.80 - 1.96

0.100 5.00 17.00 4.00 5.00 3.31 0.100 5.00 18.00 4.20 5.00 3.31 0.100 5.00 19.00 4.40 5.00 3.31 0.200 10.00 21.00 4.60 5.00 3.31 0.100 10.00 23.00 4.80 10.00 4.64 0.150 15.00 26.00 5.00 10.00 4.64 0.200 10.00 28.00 5.20 5.00 3.31 0.200 10.00 30.00 5.40 5.00 3.31 0.033 5.00 31.00 5.60 15.00 5.96 0.033 5.00 32.00 5.80 15.00 5.96 0.100 10.00 34.00 6.00 10.00 4.64 0.100 5.00 35.00 6.20 5.00 3.31 0.100 5.00 36.00 6.40 5.00 3.31 0.200 10.00 38.00 6.60 5.00 3.31 0.067 10.00 40.00 6.80 15.00 5.96 0.067 10.00 42.00 7.00 15.00 5.96 0.200 20.00 46.00 7.20 10.00 4.64 0.133 20.00 50.00 7.40 15.00 5.96 0.060 15.00 53.00 7.60 25.00 8.57 0.060 15.00 56.00 7.80 25.00 8.57 0.060 15.00 59.00 8.00 25.00 8.57 0.133 20.00 63.00 8.20 15.00 5.96 0.100 15.00 66.00 8.40 15.00 5.96

Page 43: Sondir RitZone BSD

1.2653

0.100 15.00 69.00 8.60 15.00 5.96 0.133 20.00 73.00 8.80 15.00 5.96 0.133 20.00 77.00 9.00 15.00 5.96 0.100 20.00 81.00 9.20 20.00 7.27 0.060 15.00 84.00 9.40 25.00 8.57 0.060 15.00 87.00 9.60 25.00 8.57 0.060 15.00 90.00 9.80 25.00 8.57 0.060 15.00 93.00 10.00 25.00 8.57 0.050 15.00 96.00 10.20 30.00 9.86 0.050 15.00 99.00 10.40 30.00 9.86 0.043 15.00 102.00 10.60 35.00 11.14 0.022 10.00 104.00 10.80 45.00 13.65 0.022 10.00 106.00 11.00 45.00 13.65 0.044 20.00 110.00 11.20 45.00 13.65 0.030 15.00 113.00 11.40 50.00 14.89 0.025 15.00 116.00 11.60 60.00 17.33 0.033 15.00 119.00 11.80 45.00 13.65 0.030 15.00 122.00 12.00 50.00 14.89 0.067 20.00 126.00 12.20 30.00 9.86 0.045 25.00 131.00 12.40 55.00 16.12 0.042 25.00 136.00 12.60 60.00 17.33 0.038 25.00 141.00 12.80 65.00 18.53 0.025 20.00 145.00 13.00 80.00 22.06 0.026 25.00 150.00 13.20 95.00 25.47 0.025 25.00 155.00 13.40 100.00 26.58 0.023 25.00 160.00 13.60 100.00 26.58 0.017 20.00 164.00 13.80 110.00 28.76 0.015 20.00 168.00 14.00 120.00 30.88 0.017 25.00 173.00 14.20 135.00 33.96 0.017 25.00 178.00 14.40 150.00 36.89 0.010 15.00 181.00 14.60 150.00 36.89 0.013 20.00 185.00 14.80 145.00 35.93 0.014 25.00 190.00 15.00 150.00 36.89 0.008 15.00 193.00 15.20 185.00 43.17 0.013 20.00 197.00 15.40 200.00 45.60 0.013 25.00 202.00 15.60 160.00 38.77 0.008 15.00 205.00 15.80 195.00 44.81 0.008 15.00 208.00 16.00 195.00 44.81 0.012 15.00 211.00 16.20 185.00 43.17 0.019 35.00 218.00 16.40 130.00 32.95 0.018 35.00 225.00 16.60 180.00 42.33 0.015 30.00 231.00 16.80 200.00 45.60 0.014 25.00 236.00 17.00 200.00 45.60 0.011 20.00 240.00 17.20 180.00 42.33 0.010 15.00 243.00 17.40 175.00 41.47 0.017 25.00 248.00 17.60 155.00 37.84 0.010 15.00 251.00 17.80 150.00 36.89

Page 44: Sondir RitZone BSD

1.2653

0.009 15.00 254.00 18.00 150.00 36.89 0.012 20.00 258.00 18.20 170.00 40.58 0.010 15.00 261.00 18.40 170.00 40.58 0.010 15.00 264.00 18.60 150.00 36.89 0.011 15.00 267.00 18.80 145.00 35.93 0.010 15.00 270.00 19.00 135.00 33.96 0.009 15.00 273.00 19.20 150.00 36.89 0.013 20.00 277.00 19.40 165.00 39.69 0.007 10.00 279.00 19.60 150.00 36.89 0.010 15.00 282.00 19.80 150.00 36.89

#DIV/0! 15.00 285.00 20.00 150.00 36.89

Page 45: Sondir RitZone BSD

1.2653

H qc0 04 57 15

10 2511.6 6012.2 3014.4 15016.8 200

18 15020 150

H qc' qc0 0 04 2.5 2.57 5 7.5

10 5 12.511.6 17.5 3012.2 -15 1514.4 60 7516.8 25 100

18 -25 7520 0 75

Page 46: Sondir RitZone BSD

1.2653

Page 47: Sondir RitZone BSD

30 41.57

ANALISIS KDD IJINSand Clay

Kedalaman (m) qc (kg/cm2)Kapasitas daya dukung ijin

Bujur sangkarMenerus (ton Bujur sangkar(ton/m2) Menerus (ton/2.47 4.00 10.00 2.60 1.43 2.272.47 4.00 10.00 3.60 1.00 2.182.47 4.00 10.00 5.00 5.71 3.192.47 4.00 10.00 1.43 7.40 10.00 4.112.47 4.00 10.00 9.40 19.50 2.47 4.00 10.00 10.40 27.004.80 6.80 13.40 13.40 57.334.80 6.80 13.40 16.60 155.63 2.47 4.00 10.00 17.60 - 2.47 4.00 10.002.47 4.00 10.004.80 6.80 13.404.80 6.80 13.402.47 4.00 10.002.47 4.00 10.002.47 4.00 10.004.80 6.80 13.40 1.00 2.47 4.00 10.002.47 4.00 10.002.47 4.00 10.004.80 6.80 13.404.80 6.80 13.40 5.71 4.80 6.80 13.404.80 6.80 13.407.11 9.60 16.807.11 9.60 16.804.80 6.80 13.404.80 6.80 13.409.40 12.40 20.209.40 12.40 20.207.11 9.60 16.804.80 6.80 13.40 10.00 4.80 6.80 13.404.80 6.80 13.409.40 12.40 20.209.40 12.40 20.207.11 9.60 16.809.40 12.40 20.20

13.91 18.00 27.0013.91 18.00 27.0013.91 18.00 27.009.40 12.40 20.20 19.50 9.40 12.40 20.20

Page 48: Sondir RitZone BSD

30 41.57

9.40 12.40 20.209.40 12.40 20.209.40 12.40 20.2011.66 15.20 23.6013.91 18.00 27.0013.91 18.00 27.0013.91 18.00 27.0013.91 18.00 27.00 27.00 16.14 20.80 30.4016.14 20.80 30.4018.35 23.60 33.8022.70 29.20 40.6022.70 29.20 40.6022.70 29.20 40.6024.85 32.00 44.0029.07 37.60 50.8022.70 29.20 40.6024.85 32.00 44.00 57.33 16.14 20.80 30.4026.97 34.80 47.4029.07 37.60 50.8031.16 40.40 54.2037.26 48.80 64.4043.17 57.20 74.6045.09 60.00 78.0045.09 60.00 78.0048.86 65.60 84.8052.53 71.20 91.6057.85 79.60 101.8062.93 88.00 112.0062.93 88.00 112.0061.26 85.20 108.6062.93 88.00 112.00 155.63 73.80 107.60 135.8078.00 116.00 146.0066.18 93.60 118.8076.63 113.20 142.6076.63 113.20 142.6073.80 107.60 135.8056.10 76.80 98.4072.34 104.80 132.4078.00 116.00 146.0078.00 116.00 146.0072.34 104.80 132.4070.84 102.00 129.0064.57 90.80 115.4062.93 88.00 112.00

Page 49: Sondir RitZone BSD

30 41.57

62.93 88.00 112.0069.32 99.20 125.6069.32 99.20 125.6062.93 88.00 112.0061.26 85.20 108.6057.85 79.60 101.8062.93 88.00 112.0067.77 96.40 122.2062.93 88.00 112.0062.93 88.00 112.0062.93 88.00 112.00

Page 50: Sondir RitZone BSD

30 41.57

Page 51: Sondir RitZone BSD

30 41.57

Page 52: Sondir RitZone BSD

13.47

Kapasitas daya dukung ijin

Bujursangkar ( Sumuran (ton Kepadatan3.00 0.36 Tanah Lepas - 2.84 0.25 Padat - - 4.60 1.43 Sangat Padat - - 6.19 2.50 Tanah Keras

Page 53: Sondir RitZone BSD

13.47

Page 54: Sondir RitZone BSD

13.47

Page 55: Sondir RitZone BSD

13.47

Page 56: Sondir RitZone BSD

13.47

Page 57: Sondir RitZone BSD

LABORATORIUM MEKANIKA TANAHJURUSAN TEKNIK SIPIL, FAKULTAS TEKNIK

UNIVERSITAS SEBELAS MARETJl. Ir. Sutami 36 a, Surakarta, Telp (0271)7012979, (0271) 647069 psw. 219, Fax: 634524

S O N D I RNama Proyek : Pembangunan Gedung BLKI Titik no. : S4Lokasi Proyek : Jl. Bayangkara 38, Surakarta, Jawa Tengah Analisis : RekiTanggal Pengujian : 08/06/2009Dikerjakan oleh : Subur

Conus 100 Friction HL = Total Local No. Depth (H) Friction

(m) (kg/cm) (kg/cm) (kg/cm)1 - - ### - - - -

2 0.20 0.00 0.00 0.00 0.00 0.00 0.00

3 0.40 0.00 0.00 0.00 0.00 0.00 0.00

4 0.60 0.00 0.00 0.00 0.00 0.00 0.00

5 0.80 35.00 40.00 5.00 10.00 10.00 0.50

6 1.00 15.00 25.00 10.00 20.00 30.00 1.00

7 1.20 15.00 20.00 0.00 0.00 30.00 0.00

8 1.40 10.00 15.00 0.00 0.00 30.00 0.00

9 1.60 5.00 10.00 0.00 0.00 30.00 0.00

10 1.80 5.00 10.00 5.00 10.00 40.00 0.50

11 2.00 10.00 15.00 5.00 10.00 50.00 0.50

12 2.20 15.00 20.00 5.00 10.00 60.00 0.50

13 2.40 15.00 20.00 5.00 10.00 70.00 0.50

14 2.60 25.00 30.00 5.00 10.00 80.00 0.50

15 2.80 15.00 20.00 5.00 10.00 90.00 0.50

16 3.00 15.00 25.00 10.00 20.00 110.00 1.00

17 3.20 180.00 200.00 20.00 40.00 150.00 2.00

18 3.40 180.00 210.00 30.00 60.00 210.00 3.00

19 3.60 185.00 210.00 25.00 50.00 260.00 2.50

20 3.80 100.00 135.00 35.00 70.00 330.00 3.50

21 4.00 35.00 55.00 20.00 40.00 370.00 2.00

22 4.20 35.00 60.00 25.00 50.00 420.00 2.50

23 4.40 25.00 35.00 10.00 20.00 440.00 1.00

24 4.60 25.00 40.00 15.00 30.00 470.00 1.50

25 4.80 40.00 50.00 10.00 20.00 490.00 1.00

26 5.00 30.00 45.00 15.00 30.00 520.00 1.50

27 5.20 50.00 65.00 15.00 30.00 550.00 1.50

28 5.40 45.00 55.00 10.00 20.00 570.00 1.00

29 5.60 80.00 100.00 20.00 40.00 610.00 2.00

30 5.80 155.00 190.00 35.00 70.00 680.00 3.50

31 6.00 190.00 215.00 25.00 50.00 730.00 2.50

32 6.20 200.00 220.00 20.00 40.00 770.00 2.00

33 6.40 185.00 200.00 15.00 30.00 800.00 1.50

34 6.60 180.00 200.00 20.00 40.00 840.00 2.00

35 6.80 190.00 210.00 20.00 40.00 880.00 2.00

36 7.00 210.00 225.00 15.00 30.00 910.00 1.50

37 7.20 250.00

( qc ) (q

f) (H-q

c)xD/A HT = HL

(kg/cm2) (kg/cm2) (kg/cm2)

Page 58: Sondir RitZone BSD

LABORATORIUM MEKANIKA TANAHJURUSAN TEKNIK SIPIL, FAKULTAS TEKNIK

UNIVERSITAS SEBELAS MARETJl. Ir. Sutami 36 a, Surakarta, Telp (0271)7012979, (0271) 647069 psw. 219, Fax: 634524

S O N D I RNama Proyek : Pembangunan Gedung BLKI Titik no. : S4Lokasi Proyek : Jl. Bayangkara 38, Surakarta, Jawa Tengah Analisis : RekiTanggal Pengujian : 08/06/2009Dikerjakan oleh : Subur

- 50.00 100.00 150.00 200.00 250.00

-

1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

9.00

10.00

11.00

12.00

13.00

14.00

15.00

16.00

17.00

18.00

19.00

20.00

Column B

Column B

Column B

De

pth

(m

)

Page 59: Sondir RitZone BSD

LABORATORIUM MEKANIKA TANAHJURUSAN TEKNIK SIPIL, FAKULTAS TEKNIK

UNIVERSITAS SEBELAS MARETJl. Ir. Sutami 36 a, Surakarta, Telp (0271)7012979, (0271) 647069 psw. 219, Fax: 634524

S O N D I RNama Proyek : Pembangunan Gedung BLKI Titik no. : S4Lokasi Proyek : Jl. Bayangkara 38, Surakarta, Jawa Tengah Analisis : RekiTanggal Pengujian : 08/06/2009Dikerjakan oleh : Subur

- 50.00 100.00 150.00 200.00 250.00

-

1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

9.00

10.00

11.00

12.00

13.00

14.00

15.00

16.00

17.00

18.00

19.00

20.00

Column B

Column B

Column B

De

pth

(m

)

Page 60: Sondir RitZone BSD

1.2653

Fr Local Total ANALISIS KDD IJINfs/qc Friction Friction

Kedalaman (m)qc (kg/cm2)Sand

(kg/cm) Menerus (to0 - - 1.96

#DIV/0! - - 0.20 - 1.96#DIV/0! - - 0.40 - 1.96#DIV/0! - - 0.60 - 1.96

0.014 5.00 1.00 0.80 35.00 11.14 0.067 10.00 3.00 1.00 15.00 5.96 - - 3.00 1.20 15.00 5.96 - - 3.00 1.40 10.00 4.64 - - 3.00 1.60 5.00 3.31 0.100 5.00 4.00 1.80 5.00 3.31 0.050 5.00 5.00 2.00 10.00 4.64 0.033 5.00 6.00 2.20 15.00 5.96 0.033 5.00 7.00 2.40 15.00 5.96 0.020 5.00 8.00 2.60 25.00 8.57 0.033 5.00 9.00 2.80 15.00 5.96 0.067 10.00 11.00 3.00 15.00 5.96 0.011 20.00 15.00 3.20 180.00 42.33 0.017 30.00 21.00 3.40 180.00 42.33 0.014 25.00 26.00 3.60 185.00 43.17 0.035 35.00 33.00 3.80 100.00 26.58 0.057 20.00 37.00 4.00 35.00 11.14 0.071 25.00 42.00 4.20 35.00 11.14 0.040 10.00 44.00 4.40 25.00 8.57 0.060 15.00 47.00 4.60 25.00 8.57 0.025 10.00 49.00 4.80 40.00 12.40 0.050 15.00 52.00 5.00 30.00 9.86 0.030 15.00 55.00 5.20 50.00 14.89 0.022 10.00 57.00 5.40 45.00 13.65 0.025 20.00 61.00 5.60 80.00 22.06 0.023 35.00 68.00 5.80 155.00 37.84 0.013 25.00 73.00 6.00 190.00 44.00 0.010 20.00 77.00 6.20 200.00 45.60 0.008 15.00 80.00 6.40 185.00 43.17 0.011 20.00 84.00 6.60 180.00 42.33 0.011 20.00 88.00 6.80 190.00 44.00 0.007 15.00 91.00 7.00 210.00 47.12

7.20 250.00 52.32

Page 61: Sondir RitZone BSD

1.2653

Page 62: Sondir RitZone BSD

1.2653

Page 63: Sondir RitZone BSD

ANALISIS KDD IJINSand Clay

Kedalaman (m)qc (kg/cm2)Kapasitas daya dukung ijin

Bujur sangkarMenerus (ton Bujur sangkar(ton/m2) Menerus (t Bujursangk2.47 4.00 10.00 0.00 - 3.20 11.25 4.37 6.652.47 4.00 10.00 3.20 - 4.00 161.25 32.74 55.752.47 4.00 10.00 4.00 - 4.80 30.00 8.31 13.472.47 4.00 10.00 11.25 4.80 - 5.80 49.00 12.20 20.19

18.35 23.60 33.80 5.80 - 7.20 187.14 36.84 62.849.40 12.40 20.20 7.20 250.00 45.60 78.009.40 12.40 20.207.11 9.60 16.804.80 6.80 13.404.80 6.80 13.407.11 9.60 16.809.40 12.40 20.209.40 12.40 20.20

13.91 18.00 27.009.40 12.40 20.209.40 12.40 20.20

72.34 104.80 132.4072.34 104.80 132.40 161.25 73.80 107.60 135.8045.09 60.00 78.0018.35 23.60 33.8018.35 23.60 33.8013.91 18.00 27.00 30.00 13.91 18.00 27.0020.54 26.40 37.2016.14 20.80 30.4024.85 32.00 44.0022.70 29.20 40.60 49.00 37.26 48.80 64.4064.57 90.80 115.4075.23 110.40 139.2078.00 116.00 146.0073.80 107.60 135.8072.34 104.80 132.40 187.14 75.23 110.40 139.2080.63 121.60 152.8089.64 144.00 180.00 250.00

Page 64: Sondir RitZone BSD
Page 65: Sondir RitZone BSD
Page 66: Sondir RitZone BSD

Kapasitas daya dukung ijin

Sumuran (tKepadatan 2.81 Tanah Lepas - 40.31 Sangat Padat - - 7.50 Padat Sedang - - 12.25 Padat 46.79 Sangat Padat 62.50 Tanah Keras

Page 67: Sondir RitZone BSD
Page 68: Sondir RitZone BSD
Page 69: Sondir RitZone BSD

LABORATORIUM MEKANIKA TANAHJURUSAN TEKNIK SIPIL, FAKULTAS TEKNIKUNIVERSITAS SEBELAS MARETJl. Ir. Sutami 36 a, Surakarta, Telp (0271)7012979, (0271) 647069 psw. 219, Fax: 634524

S O N D I RNama Proyek : Pembangunan Gedung BLKI Titik no. : S5Lokasi Proyek : Jl. Bayangkara 38, Surakarta, Jawa Tengah Analisis : RekiTanggal Pengujian : 09/06/2009Dikerjakan oleh : Subur

Conus Biconus Friction HL = Total Local No. Depth (H) Friction

(m) (kg/cm) (kg/cm) (kg/cm)1 - - ### - - -

2 0.20 0.00 0.00 0.00 0.00 0.00 0.00

3 0.40 0.00 0.00 0.00 0.00 0.00 0.00

4 0.60 0.00 0.00 0.00 0.00 0.00 0.00

5 0.80 0.00 0.00 0.00 0.00 0.00 0.00

6 1.00 0.00 5.00 5.00 10.00 10.00 0.50

7 1.20 0.00 5.00 5.00 10.00 20.00 0.50

8 1.40 0.00 5.00 5.00 10.00 30.00 0.50

9 1.60 0.00 5.00 5.00 10.00 40.00 0.50

10 1.80 5.00 10.00 5.00 10.00 50.00 0.50

11 2.00 10.00 15.00 5.00 10.00 60.00 0.50

12 2.20 15.00 25.00 10.00 20.00 80.00 1.00

13 2.40 15.00 25.00 10.00 20.00 100.00 1.00

14 2.60 25.00 30.00 5.00 10.00 110.00 0.50

15 2.80 25.00 35.00 10.00 20.00 130.00 1.00

16 3.00 15.00 25.00 10.00 20.00 150.00 1.00

17 3.20 20.00 25.00 5.00 10.00 160.00 0.50

18 3.40 40.00 55.00 15.00 30.00 190.00 1.50

19 3.60 50.00 65.00 15.00 30.00 220.00 1.50

20 3.80 95.00 115.00 20.00 40.00 260.00 2.00

21 4.00 100.00 120.00 20.00 40.00 300.00 2.00

22 4.20 55.00 65.00 10.00 20.00 320.00 1.00

23 4.40 15.00 40.00 25.00 50.00 370.00 2.50

24 4.60 15.00 20.00 5.00 10.00 380.00 0.50

25 4.80 5.00 15.00 10.00 20.00 400.00 1.00

26 5.00 20.00 25.00 5.00 10.00 410.00 0.50

27 5.20 30.00 40.00 10.00 20.00 430.00 1.00

28 5.40 50.00 60.00 10.00 20.00 450.00 1.00

29 5.60 60.00 85.00 25.00 50.00 500.00 2.50

30 5.80 25.00 40.00 15.00 30.00 530.00 1.50

31 6.00 70.00 85.00 15.00 30.00 560.00 1.50

32 6.20 70.00 100.00 30.00 60.00 620.00 3.00

33 6.40 185.00 210.00 25.00 50.00 670.00 2.50

34 6.60 250.00

( qc ) (q

f) (H-q

c)xD/A HT = HL

(kg/cm2) (kg/cm2) (kg/cm2)

Page 70: Sondir RitZone BSD

LABORATORIUM MEKANIKA TANAHJURUSAN TEKNIK SIPIL, FAKULTAS TEKNIKUNIVERSITAS SEBELAS MARETJl. Ir. Sutami 36 a, Surakarta, Telp (0271)7012979, (0271) 647069 psw. 219, Fax: 634524

S O N D I RNama Proyek : Pembangunan Gedung BLKI Titik no. : S5Lokasi Proyek : Jl. Bayangkara 38, Surakarta, Jawa Tengah Analisis : RekiTanggal Pengujian : 09/06/2009Dikerjakan oleh : Subur

- 50.00 100.00 150.00 200.00 250.00

-

1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

9.00

10.00

11.00

12.00

13.00

14.00

15.00

16.00

17.00

18.00

19.00

20.00

Column B

Column B

Column B

De

pth

(m

)

Page 71: Sondir RitZone BSD

LABORATORIUM MEKANIKA TANAHJURUSAN TEKNIK SIPIL, FAKULTAS TEKNIKUNIVERSITAS SEBELAS MARETJl. Ir. Sutami 36 a, Surakarta, Telp (0271)7012979, (0271) 647069 psw. 219, Fax: 634524

S O N D I RNama Proyek : Pembangunan Gedung BLKI Titik no. : S5Lokasi Proyek : Jl. Bayangkara 38, Surakarta, Jawa Tengah Analisis : RekiTanggal Pengujian : 09/06/2009Dikerjakan oleh : Subur

- 50.00 100.00 150.00 200.00 250.00

-

1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

9.00

10.00

11.00

12.00

13.00

14.00

15.00

16.00

17.00

18.00

19.00

20.00

Column B

Column B

Column B

De

pth

(m

)

Page 72: Sondir RitZone BSD

Fr Local Total ANALISIS KDD IJINfs/qc Friction Friction

Kedalaman (m)qc (kg/cm2)Sand

(kg/cm) Menerus (to Bujur sangkar0 - - 1.96 2.47

#DIV/0! - - 0.20 - 1.96 2.47#DIV/0! - - 0.40 - 1.96 2.47#DIV/0! - - 0.60 - 1.96 2.47#DIV/0! - - 0.80 - 1.96 2.47#DIV/0! 5.00 1.00 1.00 - 1.96 2.47#DIV/0! 5.00 2.00 1.20 - 1.96 2.47#DIV/0! 5.00 3.00 1.40 - 1.96 2.47#DIV/0! 5.00 4.00 1.60 - 1.96 2.47

0.100 5.00 5.00 1.80 5.00 3.31 4.80 0.050 5.00 6.00 2.00 10.00 4.64 7.11 0.067 10.00 8.00 2.20 15.00 5.96 9.40 0.067 10.00 10.00 2.40 15.00 5.96 9.40 0.020 5.00 11.00 2.60 25.00 8.57 13.91 0.040 10.00 13.00 2.80 25.00 8.57 13.91 0.067 10.00 15.00 3.00 15.00 5.96 9.40 0.025 5.00 16.00 3.20 20.00 7.27 11.66 0.038 15.00 19.00 3.40 40.00 12.40 20.54 0.030 15.00 22.00 3.60 50.00 14.89 24.85 0.021 20.00 26.00 3.80 95.00 25.47 43.17 0.020 20.00 30.00 4.00 100.00 26.58 45.09 0.018 10.00 32.00 4.20 55.00 16.12 26.97 0.167 25.00 37.00 4.40 15.00 5.96 9.40 0.033 5.00 38.00 4.60 15.00 5.96 9.40 0.200 10.00 40.00 4.80 5.00 3.31 4.80 0.025 5.00 41.00 5.00 20.00 7.27 11.66 0.033 10.00 43.00 5.20 30.00 9.86 16.14 0.020 10.00 45.00 5.40 50.00 14.89 24.85 0.042 25.00 50.00 5.60 60.00 17.33 29.07 0.060 15.00 53.00 5.80 25.00 8.57 13.91 0.021 15.00 56.00 6.00 70.00 19.72 33.21 0.043 30.00 62.00 6.20 70.00 19.72 33.21 0.014 25.00 67.00 6.40 185.00 43.17 73.80

6.60 250.00 52.32 89.64

Page 73: Sondir RitZone BSD
Page 74: Sondir RitZone BSD
Page 75: Sondir RitZone BSD

ANALISIS KDD IJINClay

Kedalaman (m)qc (kg/cm2)Kapasitas daya dukung ijin

Menerus (ton Bujur sangkar(ton/m2) Menerus (t BujursangkSumuran (tKepadatan4.00 10.00 0.00 - 3.40 7.65 3.60 5.32 1.91 Tanah Lep4.00 10.00 7.65 3.40 - 4.40 68.00 15.97 26.72 17.00 Padat4.00 10.00 4.40 - 5.20 13.75 4.90 7.57 3.44 Tanah Lep4.00 10.00 5.20 - 6.40 50.83 12.57 20.83 12.71 Padat4.00 10.00 6.40 - 6.60 185.00 36.51 62.27 46.25 Sangat Padat4.00 10.00 6.60 250.00 45.60 78.00 62.50 Tanah Keras4.00 10.004.00 10.004.00 10.006.80 13.409.60 16.80

12.40 20.2012.40 20.2018.00 27.0018.00 27.0012.40 20.2015.20 23.6026.40 37.2032.00 44.00 68.00 57.20 74.6060.00 78.0034.80 47.4012.40 20.20 13.75 12.40 20.206.80 13.40

15.20 23.6020.80 30.4032.00 44.0037.60 50.80 50.83 18.00 27.0043.20 57.6043.20 57.60

107.60 135.80 185.00 144.00 180.00 250.00

Page 76: Sondir RitZone BSD
Page 77: Sondir RitZone BSD
Page 78: Sondir RitZone BSD

Kepadatan - - - - - - -

Sangat Padat - Tanah Keras 20.00

40.00

250.00 100.00 250.00 120.00 500.00 160.00 500.00 200.00 250.00 220.00 500.00 260.00 500.00 300.00 250.00 320.00 750.00 380.00 750.00 440.00 1,000.00 520.00 1,000.00 600.00 500.00 640.00 1,250.00 740.00 250.00 760.00 500.00 800.00 250.00 820.00 500.00 860.00 500.00 900.00 1,250.00 1,000.00 750.00 1,060.00 750.00 1,120.00 1,500.00 1,240.00 1,250.00 1,340.00 - -

Page 79: Sondir RitZone BSD
Page 80: Sondir RitZone BSD
Page 81: Sondir RitZone BSD

LABORATORIUM MEKANIKA TANAHJURUSAN TEKNIK SIPIL, FAKULTAS TEKNIKUNIVERSITAS SEBELAS MARETJl. Ir. Sutami 36 a, Surakarta, Telp (0271)7012979, (0271) 647069 psw. 219, Fax: 634524

S O N D I RNama Proyek : Pembangunan Gedung BLKI Titik no. : S6Lokasi Proyek : Jl. Bayangkara 38, Surakarta, Jawa Tengah Analisis : RekiTanggal Pengujian : 09/06/2009Dikerjakan oleh : Subur

Conus Biconus Friction HL = Total Local No. Depth (H) Friction

(m) (kg/cm) (kg/cm) (kg/cm)1 - - ### - - -

2 0.20 0.00 0.00 0.00 0.00 0.00 0.00

3 0.40 5.00 10.00 0.00 0.00 0.00 0.00

4 0.60 5.00 10.00 0.00 0.00 0.00 0.00

5 0.80 5.00 10.00 0.00 0.00 0.00 0.00

6 1.00 10.00 15.00 5.00 10.00 10.00 0.50

7 1.20 5.00 10.00 5.00 10.00 20.00 0.50

8 1.40 15.00 25.00 10.00 20.00 40.00 1.00

9 1.60 0.00 5.00 5.00 10.00 50.00 0.50

10 1.80 0.00 5.00 5.00 10.00 60.00 0.50

11 2.00 10.00 15.00 5.00 10.00 70.00 0.50

12 2.20 15.00 20.00 5.00 10.00 80.00 0.50

13 2.40 10.00 15.00 5.00 10.00 90.00 0.50

14 2.60 45.00 55.00 10.00 20.00 110.00 1.00

15 2.80 60.00 85.00 25.00 50.00 160.00 2.50

16 3.00 185.00 200.00 15.00 30.00 190.00 1.50

17 3.20 115.00 150.00 35.00 70.00 260.00 3.50

18 3.40 165.00 190.00 25.00 50.00 310.00 2.50

19 3.60 175.00 200.00 25.00 50.00 360.00 2.50

20 3.80 100.00 135.00 35.00 70.00 430.00 3.50

21 4.00 95.00 130.00 35.00 70.00 500.00 3.50

22 4.20 60.00 80.00 20.00 40.00 540.00 2.00

23 4.40 50.00 65.00 15.00 30.00 570.00 1.50

24 4.60 20.00 30.00 10.00 20.00 590.00 1.00

25 4.80 15.00 25.00 10.00 20.00 610.00 1.00

26 5.00 25.00 30.00 5.00 10.00 620.00 0.50

27 5.20 25.00 35.00 10.00 20.00 640.00 1.00

28 5.40 25.00 35.00 10.00 20.00 660.00 1.00

29 5.60 15.00 20.00 5.00 10.00 670.00 0.50

30 5.80 50.00 60.00 10.00 20.00 690.00 1.00

31 6.00 100.00 120.00 20.00 40.00 730.00 2.00

32 6.20 60.00 75.00 15.00 30.00 760.00 1.50

33 6.40 150.00 180.00 30.00 60.00 820.00 3.00

34 6.60 20.00 50.00 30.00 60.00 880.00 3.00

35 6.80 75.00 85.00 10.00 20.00 900.00 1.00

36 7.00 115.00 125.00 10.00 20.00 920.00 1.00

37 7.20 200.00 225.00 25.00 50.00 970.00 2.50

( qc ) (qf) (H-qc)xD/A HT = HL

(kg/cm2) (kg/cm2) (kg/cm2)

Page 82: Sondir RitZone BSD

LABORATORIUM MEKANIKA TANAHJURUSAN TEKNIK SIPIL, FAKULTAS TEKNIKUNIVERSITAS SEBELAS MARETJl. Ir. Sutami 36 a, Surakarta, Telp (0271)7012979, (0271) 647069 psw. 219, Fax: 634524

S O N D I RNama Proyek : Pembangunan Gedung BLKI Titik no. : S6Lokasi Proyek : Jl. Bayangkara 38, Surakarta, Jawa Tengah Analisis : RekiTanggal Pengujian : 09/06/2009Dikerjakan oleh : Subur

38 7.40 250.00

- 50.00 100.00 150.00 200.00 250.00

-

1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

9.00

10.00

11.00

12.00

13.00

14.00

15.00

16.00

17.00

18.00

19.00

20.00

Column B

Column B

Column B

De

pth

(m

)

Page 83: Sondir RitZone BSD

Fr Local Total ANALISIS KDD IJINfs/qc Friction Friction

Kedalaman (m)qc (kg/cm2)Sand

(kg/cm) Menerus (to Bujur sangkar0 - - 1.96 2.47

#DIV/0! - - 0.20 - 1.96 2.47 - - - 0.40 5.00 3.31 4.80 - - - 0.60 5.00 3.31 4.80 - - - 0.80 5.00 3.31 4.80 0.050 5.00 1.00 1.00 10.00 4.64 7.11 0.100 5.00 2.00 1.20 5.00 3.31 4.80 0.067 10.00 4.00 1.40 15.00 5.96 9.40

#DIV/0! 5.00 5.00 1.60 - 1.96 2.47#DIV/0! 5.00 6.00 1.80 - 1.96 2.47

0.050 5.00 7.00 2.00 10.00 4.64 7.11 0.033 5.00 8.00 2.20 15.00 5.96 9.40 0.050 5.00 9.00 2.40 10.00 4.64 7.11 0.022 10.00 11.00 2.60 45.00 13.65 22.70 0.042 25.00 16.00 2.80 60.00 17.33 29.07 0.008 15.00 19.00 3.00 185.00 43.17 73.80 0.030 35.00 26.00 3.20 115.00 29.83 50.71 0.015 25.00 31.00 3.40 165.00 39.69 67.77 0.014 25.00 36.00 3.60 175.00 41.47 70.84 0.035 35.00 43.00 3.80 100.00 26.58 45.09 0.037 35.00 50.00 4.00 95.00 25.47 43.17 0.033 20.00 54.00 4.20 60.00 17.33 29.07 0.030 15.00 57.00 4.40 50.00 14.89 24.85 0.050 10.00 59.00 4.60 20.00 7.27 11.66 0.067 10.00 61.00 4.80 15.00 5.96 9.40 0.020 5.00 62.00 5.00 25.00 8.57 13.91 0.040 10.00 64.00 5.20 25.00 8.57 13.91 0.040 10.00 66.00 5.40 25.00 8.57 13.91 0.033 5.00 67.00 5.60 15.00 5.96 9.40 0.020 10.00 69.00 5.80 50.00 14.89 24.85 0.020 20.00 73.00 6.00 100.00 26.58 45.09 0.025 15.00 76.00 6.20 60.00 17.33 29.07 0.020 30.00 82.00 6.40 150.00 36.89 62.93 0.150 30.00 88.00 6.60 20.00 7.27 11.66 0.013 10.00 90.00 6.80 75.00 20.90 35.25 0.009 10.00 92.00 7.00 115.00 29.83 50.71 0.013 25.00 97.00 7.20 200.00 45.60 78.00

Page 84: Sondir RitZone BSD

7.40 250.00 52.32 89.64

Page 85: Sondir RitZone BSD

ANALISIS KDD IJINClay

Kedalaman (m)qc (kg/cm2)Kapasitas daya dukung ijin

Menerus (ton Bujur sangkar(ton/m2) Menerus (t BujursangkSumuran (tKepadatan4.00 10.00 0.00 - 2.60 6.15 3.28 4.76 1.54 Tanah Lep4.00 10.00 6.15 2.60 - 3.00 52.50 12.90 21.41 13.13 Padat6.80 13.40 3.00 - 3.80 160.00 32.54 55.40 40.00 Tanah Kera6.80 13.40 3.80 - 4.60 76.25 17.57 29.49 19.06 Padat6.80 13.40 4.60 - 5.80 20.83 6.40 10.15 5.21 Tanah Lepas9.60 16.80 5.80 - 7.20 81.43 18.57 31.21 20.36 Padat6.80 13.40 7.20 - 7.40 200.00 38.77 66.18 50.00 Sangat Padat

12.40 20.20 7.40 250.00 45.60 78.00 62.50 Tanah Keras4.00 10.004.00 10.009.60 16.80

12.40 20.209.60 16.80

29.20 40.6037.60 50.80 52.50

107.60 135.8068.40 88.20 160.00 96.40 122.20

102.00 129.0060.00 78.0057.20 74.60 76.25 37.60 50.8032.00 44.0015.20 23.6012.40 20.20 20.83 18.00 27.0018.00 27.0018.00 27.0012.40 20.2032.00 44.0060.00 78.0037.60 50.8088.00 112.00 81.43 15.20 23.6046.00 61.0068.40 88.20116.00 146.00 200.00

Page 86: Sondir RitZone BSD

144.00 180.00 250.00

Page 87: Sondir RitZone BSD

Kepadatan - - - - - - -

Tanah Lepas - 20.00

Sangat Padat 40.00 Tanah Keras

250.00 120.00 250.00 140.00 250.00 160.00 250.00 180.00 500.00 220.00 1,250.00 320.00 750.00 380.00 1,750.00 520.00 1,250.00 620.00 1,250.00 720.00 1,750.00 860.00 1,750.00 1,000.00 1,000.00 1,080.00 750.00 1,140.00 500.00 1,180.00 500.00 1,220.00 250.00 1,240.00 500.00 1,280.00 500.00 1,320.00 250.00 1,340.00 500.00 1,380.00 1,000.00 1,460.00 750.00 1,520.00 1,500.00 1,640.00 1,500.00 1,760.00 500.00 1,800.00 500.00 1,840.00 1,250.00 1,940.00

Page 88: Sondir RitZone BSD

- -

Page 89: Sondir RitZone BSD

LABORATORIUM MEKANIKA TANAHJURUSAN TEKNIK SIPIL, FAKULTAS TEKNIKUNIVERSITAS SEBELAS MARETJl. Ir. Sutami 36 a, Surakarta, Telp (0271)7012979, (0271) 647069 psw. 219, Fax: 634524

S O N D I RNama Proyek : Pembangunan Gedung BLKI Titik no. : S7Lokasi Proyek : Jl. Bayangkara 38, Surakarta, Jawa Tengah Analisis : RekiTanggal Pengujian : 09/06/2009Dikerjakan oleh : Subur

Conus Biconus Friction HL = Total Local No. Depth (H) Friction

(m) (kg/cm) (kg/cm) (kg/cm)1 - - ### - - -

2 0.20 0.00 0.00 0.00 0.00 0.00 0.00

3 0.40 0.00 5.00 0.00 0.00 0.00 0.00

4 0.60 10.00 15.00 0.00 0.00 0.00 0.00

5 0.80 25.00 35.00 0.00 0.00 0.00 0.00

6 1.00 5.00 10.00 5.00 10.00 10.00 0.50

7 1.20 20.00 30.00 10.00 20.00 30.00 1.00

8 1.40 0.00 0.00 0.00 0.00 30.00 0.00

9 1.60 10.00 15.00 5.00 10.00 40.00 0.50

10 1.80 10.00 15.00 5.00 10.00 50.00 0.50

11 2.00 10.00 15.00 5.00 10.00 60.00 0.50

12 2.20 20.00 30.00 10.00 20.00 80.00 1.00

13 2.40 10.00 15.00 5.00 10.00 90.00 0.50

14 2.60 10.00 15.00 5.00 10.00 100.00 0.50

15 2.80 10.00 15.00 5.00 10.00 110.00 0.50

16 3.00 30.00 40.00 10.00 20.00 130.00 1.00

17 3.20 30.00 40.00 10.00 20.00 150.00 1.00

18 3.40 20.00 25.00 5.00 10.00 160.00 0.50

19 3.60 5.00 10.00 5.00 10.00 170.00 0.50

20 3.80 30.00 45.00 15.00 30.00 200.00 1.50

21 4.00 145.00 155.00 10.00 20.00 220.00 1.00

22 4.20 200.00 220.00 20.00 40.00 260.00 2.00

23 4.40 185.00 200.00 15.00 30.00 290.00 1.50

24 4.60 120.00 130.00 10.00 20.00 310.00 1.00

25 4.80 20.00 35.00 15.00 30.00 340.00 1.50

26 5.00 35.00 40.00 5.00 10.00 350.00 0.50

27 5.20 10.00 25.00 15.00 30.00 380.00 1.50

28 5.40 15.00 25.00 10.00 20.00 400.00 1.00

29 5.60 25.00 35.00 10.00 20.00 420.00 1.00

30 5.80 40.00 45.00 5.00 10.00 430.00 0.50

31 6.00 20.00 30.00 10.00 20.00 450.00 1.00

32 6.20 30.00 45.00 15.00 30.00 480.00 1.50

33 6.40 65.00 80.00 15.00 30.00 510.00 1.50

34 6.60 210.00 225.00 15.00 30.00 540.00 1.50

35 6.80 65.00 85.00 20.00 40.00 580.00 2.00

36 7.00 50.00 55.00 5.00 10.00 590.00 0.50

37 7.20 160.00 175.00 15.00 30.00 620.00 1.50

38 7.40 145.00 170.00 25.00 50.00 670.00 2.50

( qc ) (q

f) (H-q

c)xD/A HT = HL

(kg/cm2) (kg/cm2) (kg/cm2)

Page 90: Sondir RitZone BSD

LABORATORIUM MEKANIKA TANAHJURUSAN TEKNIK SIPIL, FAKULTAS TEKNIKUNIVERSITAS SEBELAS MARETJl. Ir. Sutami 36 a, Surakarta, Telp (0271)7012979, (0271) 647069 psw. 219, Fax: 634524

S O N D I RNama Proyek : Pembangunan Gedung BLKI Titik no. : S7Lokasi Proyek : Jl. Bayangkara 38, Surakarta, Jawa Tengah Analisis : RekiTanggal Pengujian : 09/06/2009Dikerjakan oleh : Subur

39 7.60 250.00

- 50.00 100.00 150.00 200.00 250.00

-

1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

9.00

10.00

11.00

12.00

13.00

14.00

15.00

16.00

17.00

18.00

19.00

20.00

Column B

Column B

Column B

De

pth

(m

)

Page 91: Sondir RitZone BSD

Fr Local Total ANALISIS KDD IJINfs/qc Friction Friction

Kedalaman (m)qc (kg/cm2)Sand

(kg/cm) Menerus (to Bujur sangkar0 - - 1.96 2.47

#DIV/0! - - 0.20 - 1.96 2.47#DIV/0! - - 0.40 - 1.96 2.47

- - - 0.60 10.00 4.64 7.11 - - - 0.80 25.00 8.57 13.91 0.100 5.00 1.00 1.00 5.00 3.31 4.80 0.050 10.00 3.00 1.20 20.00 7.27 11.66

#DIV/0! - 3.00 1.40 - 1.96 2.47 0.050 5.00 4.00 1.60 10.00 4.64 7.11 0.050 5.00 5.00 1.80 10.00 4.64 7.11 0.050 5.00 6.00 2.00 10.00 4.64 7.11 0.050 10.00 8.00 2.20 20.00 7.27 11.66 0.050 5.00 9.00 2.40 10.00 4.64 7.11 0.050 5.00 10.00 2.60 10.00 4.64 7.11 0.050 5.00 11.00 2.80 10.00 4.64 7.11 0.033 10.00 13.00 3.00 30.00 9.86 16.14 0.033 10.00 15.00 3.20 30.00 9.86 16.14 0.025 5.00 16.00 3.40 20.00 7.27 11.66 0.100 5.00 17.00 3.60 5.00 3.31 4.80 0.050 15.00 20.00 3.80 30.00 9.86 16.14 0.007 10.00 22.00 4.00 145.00 35.93 61.26 0.010 20.00 26.00 4.20 200.00 45.60 78.00 0.008 15.00 29.00 4.40 185.00 43.17 73.80 0.008 10.00 31.00 4.60 120.00 30.88 52.53 0.075 15.00 34.00 4.80 20.00 7.27 11.66 0.014 5.00 35.00 5.00 35.00 11.14 18.35 0.150 15.00 38.00 5.20 10.00 4.64 7.11 0.067 10.00 40.00 5.40 15.00 5.96 9.40 0.040 10.00 42.00 5.60 25.00 8.57 13.91 0.013 5.00 43.00 5.80 40.00 12.40 20.54 0.050 10.00 45.00 6.00 20.00 7.27 11.66 0.050 15.00 48.00 6.20 30.00 9.86 16.14 0.023 15.00 51.00 6.40 65.00 18.53 31.16 0.007 15.00 54.00 6.60 210.00 47.12 80.63 0.031 20.00 58.00 6.80 65.00 18.53 31.16 0.010 5.00 59.00 7.00 50.00 14.89 24.85 0.009 15.00 62.00 7.20 160.00 38.77 66.18 0.017 25.00 67.00 7.40 145.00 35.93 61.26

Page 92: Sondir RitZone BSD

7.60 250.00 52.32 89.64

Page 93: Sondir RitZone BSD

ANALISIS KDD IJINClay

Kedalaman (m)qc (kg/cm2)Kapasitas daya dukung ijin

Menerus (ton Bujur sangkar(ton/m2) Menerus (t BujursangkSumuran (tKepadatan4.00 10.00 0.00 - 3.00 9.33 3.96 5.94 2.33 Tanah Lep4.00 10.00 9.33 3.00 - 4.00 23.00 6.85 10.94 5.75 Padat Sed4.00 10.00 4.00 - 4.80 162.50 32.95 56.10 40.63 Sangat Pad9.60 16.80 4.80 - 7.20 48.75 12.15 20.10 12.19 Padat

18.00 27.00 7.20 - 7.60 152.50 31.30 53.25 38.13 Sangat Padat6.80 13.40 7.60 250.00 45.60 78.00 62.50 Tanah Keras

15.20 23.604.00 10.009.60 16.809.60 16.809.60 16.80

15.20 23.609.60 16.809.60 16.809.60 16.80

20.80 30.4020.80 30.40 23.00 15.20 23.606.80 13.40

20.80 30.4085.20 108.60 162.50 116.00 146.00107.60 135.8071.20 91.6015.20 23.6023.60 33.809.60 16.80

12.40 20.20 48.75 18.00 27.0026.40 37.2015.20 23.6020.80 30.4040.40 54.20

121.60 152.8040.40 54.2032.00 44.00 152.50 93.60 118.8085.20 108.60

Page 94: Sondir RitZone BSD

144.00 180.00 250.00

Page 95: Sondir RitZone BSD

Kepadatan - - - - - - -

Sangat Padat - Tanah Keras 20.00

60.00

250.00 100.00 250.00 120.00 500.00 160.00 250.00 180.00 250.00 200.00 250.00 220.00 500.00 260.00 500.00 300.00 250.00 320.00 250.00 340.00 750.00 400.00 500.00 440.00 1,000.00 520.00 750.00 580.00 500.00 620.00 750.00 680.00 250.00 700.00 750.00 760.00 500.00 800.00 500.00 840.00 250.00 860.00 500.00 900.00 750.00 960.00 750.00 1,020.00 750.00 1,080.00 1,000.00 1,160.00 250.00 1,180.00 750.00 1,240.00 1,250.00 1,340.00

Page 96: Sondir RitZone BSD

- -

Page 97: Sondir RitZone BSD

LABORATORIUM MEKANIKA TANAHJURUSAN TEKNIK SIPIL, FAKULTAS TEKNIKUNIVERSITAS SEBELAS MARETJl. Ir. Sutami 36 a, Surakarta, Telp (0271)7012979, (0271) 647069 psw. 219, Fax: 634524

S O N D I RNama Proyek : Pembangunan Gedung BLKI Titik no. : S8Lokasi Proyek : Jl. Bayangkara 38, Surakarta, Jawa Tengah Analisis : RekiTanggal Pengujian : 09/06/2009Dikerjakan oleh : Subur

Conus Biconus Friction HL = Total Local No. Depth (H) Friction

(m) (kg/cm) (kg/cm) (kg/cm)1 - - ### - - -

2 0.20 0.00 0.00 0.00 0.00 0.00 0.00

3 0.40 0.00 0.00 0.00 0.00 0.00 0.00

4 0.60 0.00 0.00 0.00 0.00 0.00 0.00

5 0.80 0.00 0.00 0.00 0.00 0.00 0.00

6 1.00 0.00 0.00 0.00 0.00 0.00 0.00

7 1.20 10.00 15.00 5.00 10.00 10.00 0.50

8 1.40 0.00 5.00 5.00 10.00 20.00 0.50

9 1.60 30.00 40.00 10.00 20.00 40.00 1.00

10 1.80 15.00 25.00 10.00 20.00 60.00 1.00

11 2.00 15.00 20.00 5.00 10.00 70.00 0.50

12 2.20 10.00 15.00 5.00 10.00 80.00 0.50

13 2.40 15.00 20.00 5.00 10.00 90.00 0.50

14 2.60 15.00 25.00 10.00 20.00 110.00 1.00

15 2.80 15.00 30.00 15.00 30.00 140.00 1.50

16 3.00 10.00 20.00 10.00 20.00 160.00 1.00

17 3.20 10.00 15.00 5.00 10.00 170.00 0.50

18 3.40 0.00 5.00 5.00 10.00 180.00 0.50

19 3.60 5.00 10.00 5.00 10.00 190.00 0.50

20 3.80 0.00 5.00 5.00 10.00 200.00 0.50

21 4.00 0.00 5.00 5.00 10.00 210.00 0.50

22 4.20 5.00 10.00 5.00 10.00 220.00 0.50

23 4.40 5.00 10.00 5.00 10.00 230.00 0.50

24 4.60 0.00 5.00 5.00 10.00 240.00 0.50

25 4.80 5.00 10.00 5.00 10.00 250.00 0.50

26 5.00 20.00 25.00 5.00 10.00 260.00 0.50

27 5.20 10.00 15.00 5.00 10.00 270.00 0.50

28 5.40 2.00 10.00 8.00 16.00 286.00 0.80

29 5.60 10.00 15.00 5.00 10.00 296.00 0.50

30 5.80 10.00 15.00 5.00 10.00 306.00 0.50

31 6.00 20.00 25.00 5.00 10.00 316.00 0.50

32 6.20 20.00 30.00 10.00 20.00 336.00 1.00

33 6.40 50.00 65.00 15.00 30.00 366.00 1.50

34 6.60 120.00 150.00 30.00 60.00 426.00 3.00

35 6.80 185.00 200.00 15.00 30.00 456.00 1.50

( qc ) (q

f) (H-q

c)xD/A HT = HL

(kg/cm2) (kg/cm2) (kg/cm2)

Page 98: Sondir RitZone BSD

LABORATORIUM MEKANIKA TANAHJURUSAN TEKNIK SIPIL, FAKULTAS TEKNIKUNIVERSITAS SEBELAS MARETJl. Ir. Sutami 36 a, Surakarta, Telp (0271)7012979, (0271) 647069 psw. 219, Fax: 634524

S O N D I RNama Proyek : Pembangunan Gedung BLKI Titik no. : S8Lokasi Proyek : Jl. Bayangkara 38, Surakarta, Jawa Tengah Analisis : RekiTanggal Pengujian : 09/06/2009Dikerjakan oleh : Subur

36 7.00 250.00

- 50.00 100.00 150.00 200.00 250.00

-

1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

9.00

10.00

11.00

12.00

13.00

14.00

15.00

16.00

17.00

18.00

19.00

20.00

Column B

Column B

Column B

De

pth

(m

)

Page 99: Sondir RitZone BSD

LABORATORIUM MEKANIKA TANAHJURUSAN TEKNIK SIPIL, FAKULTAS TEKNIKUNIVERSITAS SEBELAS MARETJl. Ir. Sutami 36 a, Surakarta, Telp (0271)7012979, (0271) 647069 psw. 219, Fax: 634524

S O N D I RNama Proyek : Pembangunan Gedung BLKI Titik no. : S8Lokasi Proyek : Jl. Bayangkara 38, Surakarta, Jawa Tengah Analisis : RekiTanggal Pengujian : 09/06/2009Dikerjakan oleh : Subur

- 50.00 100.00 150.00 200.00 250.00

-

1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

9.00

10.00

11.00

12.00

13.00

14.00

15.00

16.00

17.00

18.00

19.00

20.00

Column B

Column B

Column B

De

pth

(m

)

Page 100: Sondir RitZone BSD

Fr Local Total ANALISIS KDD IJINfs/qc Friction Friction

Kedalaman (m)qc (kg/cm2)Sand

(kg/cm) Menerus (to Bujur sangkar0 - - 1.96 2.47

#DIV/0! - - 0.20 - 1.96 2.47#DIV/0! - - 0.40 - 1.96 2.47#DIV/0! - - 0.60 - 1.96 2.47#DIV/0! - - 0.80 - 1.96 2.47#DIV/0! - - 1.00 - 1.96 2.47

0.050 5.00 1.00 1.20 10.00 4.64 7.11#DIV/0! 5.00 2.00 1.40 - 1.96 2.47

0.033 10.00 4.00 1.60 30.00 9.86 16.14 0.067 10.00 6.00 1.80 15.00 5.96 9.40 0.033 5.00 7.00 2.00 15.00 5.96 9.40 0.050 5.00 8.00 2.20 10.00 4.64 7.11 0.033 5.00 9.00 2.40 15.00 5.96 9.40 0.067 10.00 11.00 2.60 15.00 5.96 9.40 0.100 15.00 14.00 2.80 15.00 5.96 9.40 0.100 10.00 16.00 3.00 10.00 4.64 7.11 0.050 5.00 17.00 3.20 10.00 4.64 7.11

#DIV/0! 5.00 18.00 3.40 - 1.96 2.47 0.100 5.00 19.00 3.60 5.00 3.31 4.80

#DIV/0! 5.00 20.00 3.80 - 1.96 2.47#DIV/0! 5.00 21.00 4.00 - 1.96 2.47

0.100 5.00 22.00 4.20 5.00 3.31 4.80 0.100 5.00 23.00 4.40 5.00 3.31 4.80

#DIV/0! 5.00 24.00 4.60 - 1.96 2.47 0.100 5.00 25.00 4.80 5.00 3.31 4.80 0.025 5.00 26.00 5.00 20.00 7.27 11.66 0.050 5.00 27.00 5.20 10.00 4.64 7.11 0.400 8.00 28.60 5.40 2.00 2.50 3.40 0.050 5.00 29.60 5.60 10.00 4.64 7.11 0.050 5.00 30.60 5.80 10.00 4.64 7.11 0.025 5.00 31.60 6.00 20.00 7.27 11.66 0.050 10.00 33.60 6.20 20.00 7.27 11.66 0.030 15.00 36.60 6.40 50.00 14.89 24.85 0.025 30.00 42.60 6.60 120.00 30.88 52.53 0.008 15.00 45.60 6.80 185.00 43.17 73.80

Page 101: Sondir RitZone BSD

7.00 250.00 52.32 89.64

Page 102: Sondir RitZone BSD
Page 103: Sondir RitZone BSD

ANALISIS KDD IJINClay

Kedalaman (m)qc (kg/cm2)Kapasitas daya dukung ijin

Menerus (ton Bujur sangkar(ton/m2) Menerus (t BujursangkSumuran (tKepadatan4.00 10.00 0.00 - 6.40 8.03 3.69 5.46 2.01 Tanah Lep4.00 10.00 8.03 6.40 - 6.60 50.00 12.40 20.54 12.50 Padat4.00 10.00 6.60 - 7.00 152.50 31.30 53.25 38.13 Sangat Pad4.00 10.00 7.00 250.00 45.60 78.00 62.50 Tanah Kera4.00 10.004.00 10.009.60 16.804.00 10.00

20.80 30.4012.40 20.2012.40 20.209.60 16.80

12.40 20.2012.40 20.2012.40 20.209.60 16.809.60 16.804.00 10.006.80 13.404.00 10.004.00 10.006.80 13.406.80 13.404.00 10.006.80 13.40

15.20 23.609.60 16.805.12 11.369.60 16.809.60 16.80

15.20 23.6015.20 23.6032.00 44.00 50.00 71.20 91.60

107.60 135.80 152.50

Page 104: Sondir RitZone BSD

144.00 180.00 250.00

Page 105: Sondir RitZone BSD
Page 106: Sondir RitZone BSD

Kepadatan - - - - - - -

- - 20.00

500.00 120.00 250.00 140.00 250.00 160.00 250.00 180.00 500.00 220.00 750.00 280.00 500.00 320.00 250.00 340.00 250.00 360.00 250.00 380.00 250.00 400.00 250.00 420.00 250.00 440.00 250.00 460.00 250.00 480.00 250.00 500.00 250.00 520.00 250.00 540.00 400.00 572.00 250.00 592.00 250.00 612.00 250.00 632.00 500.00 672.00 750.00 732.00 1,500.00 852.00 750.00 912.00

Page 107: Sondir RitZone BSD

- -

Page 108: Sondir RitZone BSD