1981_Hasil Sondir Gedung Grahadi Surabaya

download 1981_Hasil Sondir Gedung Grahadi Surabaya

of 31

description

nothing

Transcript of 1981_Hasil Sondir Gedung Grahadi Surabaya

  • E.#!:i

    L:ll.r't,'t.

    LAPORAN AKHIRHASI L PENYELIDIKAN TANAH

    SONDIR DAN BORINGPEMB. RUANG RAPAT DAN

    RUANG KEPRESIDENAN' GUBERNURGEDUNG GRAHADI,

    SURABAYA.

    LABORATORTUM UJI MATERIALJURUSAN TEKT{IK SIPL FTSP _ ITS

    I(ampts tTS Manyar Jl. Menur 127 Telp. 5947637 Surabaya

    2006

  • LAPORANHASIL PENYELIDIKAN TANAH

    SONDIR DAN BORINGPERENCANAAN PEMB. RUANG RAPAT DAN

    RUANG KEPRESIDENAN GUBENURGEDUNG GRAHADI,

    SURABAYA.

    CV. MULTU KONSULTAN SURABAYA

    DAFTAR ISI :

    PENDAHULUANHASIL PENYELIDIKAN TANAHPENUTUP

    LAMPIMN:

    1. Sket letak titik penyelidikan2. Grafik hasil sondir3. Hasil boring log dan rekapitulasi penyelidikan laboratorium4. Perhitungan daya dukung tanah5. Hasil uji laboratorium6. Foto dokumentasi

  • I. PENDAHULUAN

    Memenuhi permintaan CV MULTI CONSULTAN SUMBAYA,

    telah dilakukan penyelidikan tanah Sondir dan Boring olehLaboratorium Uji Material FTSP-ITS pada Proyek PembangunanRuang Rapat Dan Ruang Kepresidenan Gubenur yang berlokasi di

    Gedung Grahadi Surabaya. Tujuan dari penyelidikan ini adalah untukmengetahui kondisi lapisan tanan yang hasilnya akan dipakaisebagaisalah satu dasar perencanaan di lokasitersebut.

    I.1. PENYELIDIKAN LAPANGAN

    Penyelidikan tanah di lapangan meliputi :

    2 (dua) Titik Boring

    2 (dua) Titik Sondir

    I.2 PENYELIDIKAN LABORATORIUM

    Penyelidikan tanah di laboratorium meliputi :

    1.2.1 Physical Properties

    BeraWolume tanah dan kadar air (ASTM D 15SC6S)Derajat kejenuhan (ASTM D 221e21)Spesific gravity (ASTM D 8S4-Sg)Atterberg Limit (ASTM D 42lt-66)1.2.2 Engineering Proporties

    Direct Shear TesUTriaxial Test (ASTM D 285G.70)Kosolidasites (ASTM D 2$*tA)Khususnya pada tanah yang lembek

  • I.3 ALAT YANG DIPAKAI PADA PENYELIDIKAN LAPANGAN

    I.3.1 PENYELIOIKAN SONDIR

    Penyelidikan dilakukan dengan menggunakan alat Dutchcone

    Penetrometer kapasitas 2 ton dengan dilengkapi AdhesionJacketcone. Adapun spesifikasi detailnya antara lain adalah :

    Luas Conus = 10 cm2.

    Luas Piston = 10 cm2.

    Luas Mantel= 150 cm2.

    Hasil sondir berupa nilai tahanan conus dan jumlah hambatanpelekat pada setiap penetrasi 20 cm disajikan dalam bentukgrafik.

    I.3.2 PENYELIDIKAN BORING

    Alat yang digunakan untuk penyelidikan tanah di lapal'rger;berupa bor tangan dengan mata bor model lwan ltirgerberdiameter 4 inchi. Alat bor dilengkapi dengan pengarn!"-:,ll psrt.iiq,il,

    tanah berupa tabung besi (Thin Walled Sample4 .lu:,1,diameter 3 inchi. Pengeboran dilakukan mengikuti stasrdariASTM. Pengambilan contoh tanah Undisturbed dilakukert 51,,:.!;'

    tanah dengan kedalaman -1,00 meter, -3,0 meter dan .*5.0

    meter.

  • il. HASIL PENYELIDIKAN TANAH

    II.1 HASIL PENYELIDIKAN DI LAPANGANHasil penyelidikan tanah di lapangan dilaporkan dalam bentukboring log dan grafik sondir dapat dilihat pada lampiran laporan ini.

    I|,.2 HASIL PENYELIDIKAN DI LABORATORIUMHasil penyelidikan tanah di laboratorium terhadap masing - masing

    sample secara lengkap dapat dilihat pada lampiran laporan ini.

    PERHITUNGAN DAYA DUKUNG

    Perhitungan daya dukung pondasi dangkal berdasarkan

    persamaan Terzaghi dapat dilihat pada lampiran. Asumsi

    dimensi yang diambil dalam perhitungan laporan ini adalah

    pondasi Bujur sangkardengan hasil terlampir.

    Perhitungan daya dukung pondasi tiang pancangberdasarkan hasil sondir dapat dilihat pada lampiran

    laporan ini. Sebagaicatatan kekuatran bahan tiang belum

    diperhitungkan dalam perhitungan ini.

  • ilt. PENUTUP

    Sesuai dan berdasarkan hasil penyelidikan dilapangan sertadilaboratorium telah diperoleh hasil seperti tersebut diatas. Dalampelaksanaan dilapangan penggunaan pondasi tiang perlu diadakanevaluasi dan penyesuaian dengan kondisi beban yang akan dipikuloleh tiang tercebut, sehingga dapat diperoleh tingkat keamanan,stabilitas maupun jenis bahan tiang lebih tepat dan baik, adapaunsegala keputusan yang berkaitan dengan design serta altematifpemilihan pondasi menjadi kewenangan dan tanggung jawabperencrna.

    Demikian laporan hasil penyelidikan tanah ini disampaikan

    atas perhatian dan kerjasamanya diucapkan terima kasih.

    Surabaya,Laboratorium Uji MaterialJurusan Teknik Sipil FTSP-ITSKepala,

    t&

  • VAVEVUNSIOVHVUC CNNOSC NVNNCNVSUT:Id

    L UICINOS

  • GRAFIK SONDIR

    gz

    =5ouJY

    0

    1

    2

    3

    4

    6

    7

    8

    I10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    n21

    n

    24

    ax27

    m

    x30

    TEKANAN KoNUs {KSlm1100 150

    Jlm-AH HAf,BA?All PELEKAT (XCq,

    -Tekanan f(onus . - - Jumlah Hambatan pelekat

    PEMBANGUNAN RUANG RAPAT DAN RUANG KEPRESIDENAN GUBENURCV. MULTI CONSUL SURABAYA.

    LOKASIELEVASI

    s.1GEDUNG GRAHADI, SURABAYA

    IASTERSOTIDIRTAI{GGAI-

    : YOYOK: oJan{Xl

    0

    RASpGESEKAN(%)

    3456

    z

    =5oulY

    0

    1

    2

    3

    4

    6

    7

    8

    o

    10

    11

    12

    13

    14

    t6

    17

    18

    ,l9

    n21

    nZJ

    24

    %

    %

    27

    m

    m

    30.

    cESxAtr LOXAL (Kg/cm2l

    -LocalFrHon - - - Fri:tbnRatio

    -. t:limbuM

    \.I .- .

    (?

    Ia a::-a 1:-::

    ?t

    .a:

    -t l

    ..t- j ia: ,i+; ::i!l l-iril ti;iil i ll

    i;.i1. r1l

    :11.i-il i jJ riif

    ' li ii i-ll

    i:11 I ,. l

    l. rl il-r-jt-:i l ill; li

    I lrri

    ilii

    ttJtimbum

    II

    I

    I

  • KLIENTPROYEKTITIKLOKASIMASTERTANGGAL

    ELEVASI

    CV. MULTI CONSUL SURABAYA.PEMBANGUNAN RUANG RAPAT DAN RUANG KEPRESIDENAN (s.1GEDUNG GRAHADI, SURABAYA.YOYOK

    diameterLOCAL

    30KEDA.LAMAN CONUS CN+CL Hp

    0000000014816816 1221 1420 1418 1621 1442 2490 2486 22100 2094 1896 2095 14841865 3070 2074 1885 1460 2050 2044 1828 16168148128106108861089613 1013 1015 1016817 1014810813 1014818 1218 819820 1016815 1011 I11 I128

    JHP FRICT FR KC1&KC20

    0.20.40.60.8

    1

    1.21.41.61.82

    2.22.42.62.83

    3.23.43.63.84

    4.24.44.64.85

    5.25.45.65.86

    6.26.46.66.87

    7.27.47.67.88

    8.28.48.68.8I

    9.29.49.69.8'10

    10.210.410.6

    C-E(o0,:,

    101210't413101430787590858688755060657850403520121087656688101212106I1012141515't21077I

    00008162842567286110134156176194214228262762%314328348368386402410418426432440446454460470480490498508516524534542554562570580588598606614622

    0.00 tfitftt0.00 #tfit#0.00 fllt##0.00 ffi0.40 4.00.40 3.30.60 6.0o.70 5.0o.70 5.40.80 8.0o.70 5.01.20 4.01.20 1.51.10 1.51.00 1.10.90 1.11.00 1.20.70 0.80.90 1.21.50 3.01.00 1.70.90 1.40.70 0.91.00 2.o1.00 2.50.90 2.60.80 4.00.40 3.30.40 4.o0.40 5.00.30 4.30.40 6.70.30 6.00.40 6.70.30 5.00.50 6.30.50 6.30.50 5.00.40 3.30.50 4.20.40 4.00.40 6.70.50 6.30.40 4.00.60 5.00.40 2.90.40 2.70.50 3.30.40 3.30.50 5.00.40 5.70.40 5.70.40 5.0

    1.25 KC1.25 KC1.25 KC1.25 KC1.25 KC0.91 KC0.91 KC0.73 KC0.64 KC0.64 KC0.56 KC0.64 KC0.68 KC0.66 KC0.65 KC0.63 KC0.47 KC0.60 Kc0.64 KC0.47 KC0.55 KC0.54 KC0.47 KC0.64 KC0.49 KC0.48 KC0.47 KC0.56 KC0.91 KC0.91 KC0.91 KC0.40 Kc0.40 Kc0.40 Kc0.40 Kc0.40 Kc0.40 Kc0.40 Kc0.40 Kc0.40 Kc0.40 Kc0.40 Kc0.40 Kc0.40 Kc0.40 Kc0.40 Kc0.40 Kc0.40 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 KC

  • 10.811

    11.2DATA I.ANJUTAN 11.4

    TITIK I

    630 0.40 5_7636 0.30 5.0646 0.50 7.16s4 0.40 6.7658 0.20 4.0668 0.50 7.1672 0.20 3.3684 0.60 7.5694 0.50 6.3698 0.n 3.3704 0.30 6.0708 0.20 4.0716 0.40 6.7724 0.40 8.0728 0.20 5.07% 0.40 6.7740 0.20 4.O746 0.30 7.5754 0.40 6.775p O.2O s.0766 0.40 6.7770 0.20 4.0778 0.40 6.7786 0.40 5.7792 0.30 6.0800 0.40 6.7806 0.30 4.3816 0.50 6.3826 0.50 6.3832 0.30 6.0840 0.40 6.7846 0.30 5.0852 0.30 4.3860 0.40 6.7866 0.30 7.5874 0.40 8.0880 0.30 6.0888 0.40 6.7896 0.40 6.7902 0.30 4.3908 0.30 4.3918 0.50 5.6926 0.40 5.0934 0.40 3.6944 0.50 5.0952 0.40 3.3962 0.50 5.0970 0.40 3.3978 0.40 3.1986 0.40 3.3994 0.40 3.11000 0.30 2.1't 008 0.40 3.11016 0,40 3.31022 0.30 2.51030 0.40 3.31036 0.30 3.01444 0.40 4.A'1050 0.30 2.51056 0.30 2.51062 0.30 2.31068 0.30 2.11074 0.30 2.11080 0.30 2.31086 0.30 2.51094 0.40 4.01102 0.40 4 01110 0.40 3.31116 0.30 2.3

    0.00 KC0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 KC0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 KC0.00 Kc0.00 KC0.00 Kc0.00 KC0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 KC0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 KC0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.000000.000.000.000.000.00

    11.611.812

    12.212.412.612.813

    13.213.413.613.814

    14.214.414.614.815

    15.215.415.615.816

    16.216.416.616.817

    17.217.417.617.818

    18.218.418.618.819

    19.219.419.619.820

    20.220.420.620.821

    21.221.421.621.822

    22.222.422.622.823

    23.223.423.623.824

    24.224.4

    7676576I865565465464b567567II56676455bb77o

    I1110121012131213141312121210101212131414131210101213

    11

    91210712814138I710I61077106't071011810't01313I10o

    10107II10101010141215'15

    1615161716171717161516'13

    141515161717161514141616

    8610I410412'10

    464I84I46I4I488686't0106I66I686I866108810I10II8I6II6I68666666bIIIb

  • DATA I-ANJUTANTITIK 1

    1122 0.301128 0.301134 0.301142 0.401150 0.401158 0.40

    24.624.825

    25.225.425.6

    1213141516't6

    2.52.32.12.72.52.5

    0.000.000.000.000.000.00

    151617192020

    666III

  • VAVSVUNSIOVHVUE CNNOSC NVNNCNVEYUSd

    Z UIONOS

  • GRAFIK SONDIR

    LOKASIELEVASI

    PEMBANGUNAN RUANG RAPAT DAN RUANG KEPRESIDENAN GUBENURCV. MULTT CONSUL SURABAYA.

    : s.2: GEOUNG GRAHADI, SUMBAYA"

    IASTERSOilOTR :TAI{GGAL : 0Jan{10

    0

    1

    ?

    4

    6

    7

    a

    I10

    11

    12

    t3

    14

    15

    16

    17

    18

    19.

    20.

    21 ,

    2-

    24-%

    %-

    27],8]

    ;l

    gz

    5ouV

    0

    1

    2

    4

    (6

    7

    8

    9

    10

    11

    12

    13.

    14

    1S

    16.

    17-

    18.

    19-

    n-21 )

    2123.1

    241

    ,,]*l,rl

    I

    ;l

    g1EIoulx

    tEKANAfl (Oillrs (Kg/cmrl50 100 150

    500 1000 15oO 2oooJt fi-AH HAmATAtt PELE|qT ((Ccm)

    -

    TekaMn l(onus - - - Jumlah Hambatan pelekat

    RASp GESEKAI (%l

    3456

    GESEKAT'I LOI(IL {KO/GM2I

    llttimbum

    rb

    I I

    Uii ll

    I

    D

    i

    I

    1 i I

    i

    1

    .ltimbum I l

    \rlsi-;

    ,l

    ('< ::

    I

    r.-;

    t- ll

    {' . . ;_( t:

    t !.i:t-:t' :,.i:J.I' r'l;ir;,-:1.'. - ---.

    {,r -1 ?!i lii

    ,?, i; t-5l-!--,ii

    ilt'l :: tlI .- l'l i i .r'ii;i Li

    i l-l I :l

    l :tl: ,i

    ;il' i i i,t-(t' -i:; r.j r-.i

    iir ir,,1-Ii-ir l i--i:lli.

    i i1- j| -l-1 I

    ia f,jii ;:i-i1,i- .1;r\.,l1 I llr1,1

    ll ,li J i-l-il Li ,t

    -_r ll

    -Local Frktion ..-FrictionRatio

  • KLIENTPROYEKTITIKLOIGStMASTERTANGGAL

    ELEVASI

    CV. MULTI CONSUL SURABAYA.PEMBANGUNAN RUANG RAPAT DAN RUANG KEPRESIDENAN (s.2GEDUNG GRAHADI, SURABAYA.YOYOK

    KEDA-LAMAN CONUS

    00.20.40.60.8

    1

    1.21.41.61.82

    2.22.42.62.83

    3.23.43.63.84

    4.24.44.64.85

    5.25.45.65.86

    6.26.46.66.87

    7.27.47.67.8I

    8.28.48.68.8o

    9.29.49.69.810

    10.210.410.6

    diameter 30LOCAL

    JHP FRICT FR KC1&KC2CN+CL

    c0Eogo0

    91213 1711 1715 2013 2011 1915 2229 4175 8575 9093 10586 9587 9787 9676 8352 6858 6868 7678 8555 6339 4930 4021 3015 18812812711696961061091471291512 1511 1711 15711I 131',t 1511 17't3 1914 1815 2113 17914812610713

    HP

    000068121014161424203024182018143220161416202018o8II6688101012612I81081212I

    12810I812

    0 0.00 ffi0 0.00 ffi0 0.00 #tfflit0 0.00 ffi6' 0.30 3.314 0.40 3.126 0.60 5.536 0.50 3.350 0.70 5.466 0.80 7.380 0.70 4.7't04 1.20 4.1124 1.00 1.3154 1.50 2.0178 1.20 1.3196 0.90 1.0216 1.00 1.1234 0.90 1.0248 0.70 0.9280 1.60 3.',1300 1.00 1.7316 0.80 1.2330 0.70 0.9346 0.80 1.5366 1.00 2.6386 1.00 3.3444 0.90 4.3410 0.30 2.0418 0.40 5.0426 0.40 5.04U 0.40 5.7440 0.30 5.0446 0.30 5.0454 0.40 6.7462 0.40 6.7472 0.50 5.6482 0.50 7.1494 0.60 6.7500 0.30 2.5512 0.60 5.5520 0.40 3.6528 0.40 5.7538 0.50 6.3546 0.40 3.6558 0.60 5.5570 0.60 4.6578 0.40 2.9590 0.60 4.0598 0.40 3.1608 0.50 5.6616 0.40 5.0624 0.40 6.7636 0.60 8.6

    1.?5 KC1.25 KC1.25 KC1.25 KC1.25 KC0.99 KC0.91 KC0.73 KC0.82 KC0.64 KC0.56 KC0.64 KC0.68 KC0.66 KC0.65 KC0.63 KC0.47 KC0.60 Kco.47 KC0.64 KC0.s5 Kc0.54 KC0.56 KCo.il Kc0.56 KC0.48 KC0.46 KC0.47 KC0.99 KC0.91 KC0.91 KC0.40 KC0.40 Kc0.40 Kc0.40 KC0.40 KC0.40 Kc0.40 Kc0.40 Kc0.40 Kc0.40 KC0.40 KC0.40 Kc0.40 KC0.40 Kc0.40 Kc0.40 Kc0.40 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 KC0.00 KC

  • 10811

    11.2OATAI.ANJUTAN 11-4

    TITIK 2 11.611.812

    12.212.412.612.A13

    13.213.413.613.814

    14.214.414.614.815

    15.215.415.615.816

    16.216.416.616.817

    17.217.417.617.818

    18.218.418.618.819

    19.219.419.619.820

    20.220.420.620.821

    21.221.421.621.822

    22.222.422.622.823

    23.223.423.623.824

    24.224.4

    7766586797557545546566776778I5668646576761071011121110141314141412111310101312141413131211121211

    '10

    101110712I1213IIIIo

    6o

    769710I10108't11014137I1011106I7111011'10

    15111416171615181718171817151714141614171716171615161616

    o

    610I48610846t)4I484464846648612I4

    -6I6I4648888108I10101010II86I108II8646668I8I810

    642 0.30 4.3648 0.30 4.36s8 0.50 8.3666 0.40 6.7670 0.20 4.0678 0.40 5.0684 0.30 5.0694 0.50 7.1702 0.40 4.4706 0.20 2.9712 0.30 6.0718 0.30 6.0722 0.20 2.9730 0.40 8.0734 0.20 5.0742 0.40 8.0746 0.20 4.O750 0.20 5.0756 0.30 5.0769 0.20 4.O768 0.40 6.7772 0.20 3.3778 0.30 4.37U 0.30 4.3788 0.20 3.3796 0.40 5.7802 0.30 4.3814 0.60 7.5822 0.40 4.4826 0.20 4.0832 0.30 5.0840 0.40 6.7846 0.30 3.8854 0.40 6.7858 0.20 5.0864 0.30 5.0868 0.20 4.0876 0.40 5.7884 0.40 6.7892 0.40 5.7900 0.40 6.7910 0.50 5.0918 0.40 5.7926 0.40 4.0936 0.50 4.5946 0.50 4.2956 0.50 4.5966 0.50 5.0974 0.40 2.9982 0.40 3.1990 0.40 2.9996 0.30 2.11004 0.40 2.91014 0.50 4.21022 0.40 3.61030 0.40 3'r1038 0.40 4.O10,16 0.40 4.01052 0.30 2.31056 0.20 1.71062 0.30 2.11068 0.30 2.11074 0.30 2.31082 0.40 3.11090 0.40 s.31098 0.40 3.61106 0.40 3.31114 0.40 3.31124 0.50 4.5

    0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 KC0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 KC0.00 KcO,OO KC0.00 Kc0.00 KC0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 KC0.00 Kc0.00 Kc0.00 KC0.00 Kc0.00 KC0.00 K;0.00 KC0.00 KC0.00 r{c0.00 Kc0.00 KC0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 Kc0.00 KC0.00 Kc0.00 t{c0.00 Kc0.000.000.000.000.000.000.00

  • DATA I.ANJUTANTITIK 2

    24.624.825

    25.225.425.6

    131415161514

    2.32.12.02.53.33.6

    0.000.000.000.000.000.00

    16617618620820 1019 10

    1130 0.301136 0.301142 0.301150 0.401160 0.501170 0.50

  • LABORATORI UM UJ I MATERIALJURUSAN TEKNIK SIPIL FTSP . ITSINSTITUT TEKNOLOGI SEPULUH NOPEMBER SURABAYAKAMPUS ITS MANYAR JL MENUR 127 SUMBAYA

    ProyekLocationHole No.

    PERHITUNGAN DAYA DUKUNG PONDASI DALAM

    Pemb. Raung Rapat Dan Ruang Kepresidenan Gubenur: Gedung Grahadi, Surabaya: Sondir I

    Cetak Bulat a test:Kedalaman

    (meter)Diameter

    Tiano (crn)Luas

    lcnZ\Keliling

    (cm)NilaiKonus

    (kslcrn2lJHP

    (kc/cm)Daya Dukungliin Tekan (ton)

    Keterangan

    15.00 30 706.8 94.2 6 772 't5.919

    35 962.1 110 6 773 18.87840 1256.6 141.4 6 773 24.276

    Kedalaman

    (meter)Diameter

    Tiang (cm)Luas(cm2)

    Keliling(cm)

    NilaiKonus(kc/crn2)

    JHP(kc/cm)

    Daya Dukung

    liin Tekan (ton)Keterangan

    24.OO 30 706.8 94.2 13 9s7 21.6735 %2.1 110 13 961 25.%2

    40 12ffi.6 141.4 13 965 32.891

    Catatan :Kedalaman tiang dihitung dari permukaan tanah saat pengujian dilapangan dan harusdikoreksi bilamana dilakukan pekerjaan cuUfitlyang merubah level muka tanah

  • LABORATORI UM UJI MATERIALJURUSAN TEKNIK SIPIL FTSP - ITSINSTITUT TEKNOLOGI SEPULUH NOPEMBER SURABAYAKAMPUS ITS MANYAR JL MENUR 127 SUMBAYA

    ProyekLocationHole No.

    PERHITUNGAN DAYA DUKUNG PONDASI DALAM

    : Pemb. Raung Rapat Dan Ruang Kepresidenan Gubenur: Gedung Grahadi, Surabaya: Sondir 2

    Tiang : Tiang Pancang cetak Bulat ranqqal test: il Januari 2006Kedalaman

    (meter)Diameter

    Tiano (crn)Luas1cn2)

    Keliting(crn)

    NilaiKonus(/rrolan2)

    JHP(ko/crn)

    Daya Dukungliin Tekan (ton)

    Keterangan

    15.00 30 706.8 94.2 6 776 16.070

    35 962.1 110 6 771 19.08440 1256.6 141.4 6 777 24.521

    Kedalaman(meter)

    Diameter

    Tiano (cm)Luas

    (cm2)Keliling

    (cm)NilaiKonus

    (ko/cm2)JHP

    (ko/cm)Daya Dukung

    liin Tekan (ton)Keterangan

    24.O0 30 706.8 94.2 13 1 106 23.925

    35 %2.1 110 13 1 106 28.ffi240 125fi.6 141.4 13 1147 36.835

    Catatan :Kedalaman tiang dihitung dari permukaan tanah saat pengujian dilapangan dan harusdikoreksi bilamana dilakukan pekerjaan cutlfill yang merubah level muka tanah

  • VAVEVUNSIOVHVUC CN n0:lC NVNnCNVgyU:ld

    L CNIUOE

  • LABORATORIUM UJI MATERIALJURUSAN TEKNIK SIPIL FTSP . ITSINSTITUT TEKNOLOGI SEPULUH NOPEMBER SURABAYAKAMPUS ITS MANYAR JL MENUR 127 SURABAYA

    PERHITUNGAN DAYA DUKUNG PONDASI DANGKAL

    PROYEK : Pembangunan Gedung Ruang Rapat dan Ruang Kepresidenan GubenurLOKASI . Gedung Grahadi, Surabaya.TITIK NO. : BH.1

    Keterangan :cvo

    : Kohesi tanah: Berat volume basah: Sudut geser dalam

    Nc',Nq',Ny' : Faktor daya duku;rgult : Tegangan tlirnneteUin :Tegangairiji;'r'1...ir.,:ii

    PONDASI BUJUR SANGKAR

  • LABORATORIUM UJI MATERIALJURUSAN TEKNIK SIPIL DAN PERENCANAAN FTSP-ITS

    ITS Jl. Marwar 8

    DIRECT SHEAR TESTProyek:Lokasi: Gedung Grahadi, Surabaya.Titik: BH - 1 Kedaalaman : -1.00 m. Laborant:

    0.5

    *or(,ED:t3 0.3ooo(,c 0.2IUEDcc,

    E o.rF0.0

    0.3 0.4 0.5 0.8 o.t 0.8 0.9 1.0Tegangan Normal, kg/cm2

    No. Test 1 2 3TinggiContoh cm 3.15 3.15 3,15Diameter ctTl 6.35 6.3s 6.35Luas 2ctlt 31.67 31.67 31.67Yt um3 1.53 1.532 1.529Sr o/o 61.43 62.13 60.75Gs 2.65 2.65 2.65Tegangan.Normal kc/crn2 0.063 0.125 0.25Tegangan Geser kq/cmz 0.034 0.050 0.071Kohesi (C) kgtctnz a.o2lqdudgeserdalam(g)o 12

    t

  • LABOMTORIUM UJI MATERIALJURUSAN TEKNIK SIPIL OAN PERENCANAAN FTSP-ITS

    Kampus ITS Marnar Jl.Merur 127

    TRIAXIAL TEST ( U. U. IProjecl :Location : Gedung Grahadi, Surabaya.

    Mohr - Diagram

    0.6 0.8 1.0Normal Strees {kglcm2)

    q!E(,tDJ6JlItoGIo

    0.0 1.11.20.,(

    SUess - Strain Curve2.0

    t.8

    1.6

    ^ llo{"

    EQ rzo10bli

    808bo o.s0.4

    0.00.0 2.0 i(.0 6 0 8.0 ,lO0

    Axial St-aln,e(S)

    Point BH-1Depth (m)

    -3.00fype ofTest . U. U. testlest no. 1 2Height of Sample (cm) 7.50 7.50Dameter (cm) 3.60 3.60Sec. Area of Samole (cn2l 10.17 10.17

    Yr (Um3) 1.53 1.525Sr (o/ol 98.37 98.25Gs 2.61 2.61O3 (kg/cm2) 0.50 1.00O1 (kg/cntz) 0.836 1.432C (ko/crn2) 0.11q (o) 5

    Y = 0.0i 75x + 0.1 04

    \ / \(

  • .45 LABORATORIUM UJI MATERIAL(W} JURUSAN TEKNIK SIPIL DAN PERENCANAAN FTSP-ITS*r-tz Kamtrs ITS Manyar Jl. Menur 127 Swabaya Te1p.5917637.

    TRIAXIAL TEST ( U. U. }

    Project : 0Location : Gedung Grahadi, Surabaya.

    Stress - Strain Curve

    ,1.0 6.0 8.0 10.0 1ZO 14.0Axial Strain,e ((f)

    2.o

    t.8

    1.6

    ^ tt(\aEQ r.zov

    10b!t6 08obo o.e0.4

    0.2

    0.0

    Point BH.1Depth (m) -s.00fvoe of Test U. U. testfest no. 1 2Heioht of Samole (cm) 7.50 7.50Diameter (cm) 3.60 3.60Sec. Area of Samole fun2l 10.17 10.17

    Yt (Um3) 1.59 1.576Sr (o/ol 97.98 98.34Gs 2.6U 2.6Uo3 (kg1cm2) 0.50 1.0061 (kglcrn2) 0.815 1.410c fto/crn2) 0.10(p (o) 5

    Mohr - Diagram

    y = 0.01 r5x + 0.1r 04

    T(

    0.8

    E 0.6l,tsl,E ooo6t o.zo,

    0.00.0 0.6 0.8 1.0

    Normal Stresr (kg/cm2)1.2

  • VAVEVUNSICIVHVUC CNnO:lC NVN0CNVE[ IId

    z cNtuos

  • LABORATORIUM UJI MATERIALJURUSAN TEKNIK SIPIL FTSP - ITSINSTITUT TEKNOLOGI SEPULUH NOPEMBER SURABAYAI(AMPUS ITS MANYAR JL MENUR 127 SURABAYA

    PERHITUNGAN DAYA DUKUNG PONDASI DANGKAL

    PROYEK : Pembangunan Gedung Ruang Rapat dan Ruang Kepresidenan GubenurLOKASI : Gedung Grahadi, Surabaya.TITIK NO.: BH.2

    Keterangan :C

    To

    : Kohesi tanah: Berat volume basah: Sudrlt geser dalam

    Nc',Nq',Ny' : Faktor daya dukungult : Tegangan ultimateijin : Tegangan ijin tanah

    PONDASI BUJUR SANGKARDf

    (meter)c

    (kalcm2)Y

    /orle*)Nc' Nq' Ny' Qult

    (ton/m2)Qijin SF=2(ton/m2)

    Qijin SF=3(ton/m2)

    1.00 0.020 1.632 9.36 2.54 0.82 3.435 1.717 0.859

    1.50 o.o20 1.632 9.36 2.il o.82 6.749 3.375 1.6872.00 0.020 1.632 9.36 2.54 0.82 8.458 4.229 2.819

  • LABORATORIUM UJI MATERIALJURUSAN TEKNIK SIPIL DAN PERENCANMN FTSP-ITS

    DIRECT SHEAR TEST

    Proyek:Lokasi : Gedung Grahadi, Surabaya.Titik : BH - 2 Kedaalaman : -1.00 m. Laborant :No. Test 1 2 3TinooiContoh cm 3.15 3.15 3.1sDiameter cm 6.35 6.35 6.35Luas 2ctTt 31.67 31.67 31.67

    Yt umc 1.526 '1.531 1.529Sr Vo 60.43 59,76 60.12Gs 2.U1 2.641 2.U1Teoanoan.Normal kcr/cm2 0.063 4125 o.25Teoanqan Geser kq/cm2 0.031 0.055 o.o77Kohesi (C) Xglcm2 o.o2Sududgeserdalam(rD)o 14

    q! o-/teCD-t.: 03ooo(9c 0.26EDc(tB o.r

    0.0 0.1 o.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9Tegangan Normal, kg/cm2

  • LABORATORIUM UJI MATERIALJURUSAN TEKNIK SIPIL DAN PERENCANAAN FTSP-ITS

    Jl.Menw 127 Telo.59,17637.

    TRIAXIAL TEST ( U, U. I

    Projec{ :Location : Gedung Grahadi, Surabaya.

    Stess - Strain Curve2.0

    1.8

    ,.6

    A 1.1co .^6:

    1.0bd808booe

    0.4

    0.2

    0.02.0 1.0 6.0 8.0 to.o

    AxhlStrain,e(*)

    Point BH.2Depth (m)

    -3.00TypeofTesl' U. U. testfest no. 1 2Height of Sample (crn) 7.50 7.50Dierngler (cm) 3.60 3.60Sec. Area of Sample k;m2l 10.17 10.17

    Yr (Um3) 1.52 1.538Sr (o/o) 98.42 98.63Gs 2.623 2.62303 (kg/cm2) 0.50 1.OOC1 (kgtcrtl.2) 0.840 1.457C (ko/crn2) 0.10a (o) 6

    0.8

    E o.u(,EDI

    E'ooo!3 o.zo

    0.0

    Mohr - Diagram

    y=0.1 151x + 0.1 )06

    ( \ / \0.0 0.2 O.it 0.6 O.g 1.0 1.2 1.1 1.6

    Normal Sfiose lkglctn2l

  • .Aa I.ABORATORIUM UJI MATERIAL(A@) JURUSAN TEKNTK srprl DAN eERENcANAAN Frsp-rrsQE' Kampr.rslTs Manyar Jl.Menur 127 $trabayaTelp.5947637.

    TRIAXIAL TEST ( U. U. }

    Project : 0Location : Gedung Grahadi, Surabaya.

    Stress - Strain Curve2.0

    1.8

    't.6

    A t.4EO rad

    1.0boi808o o.e

    0.1

    0.2

    004.0 6.0 8.0 10.0 12.0 14.0

    Axial Shain,e(%)

    Point BH- 2Depth (m) -5.00fvoe of Test U. U. testTest no. 1 2Heioht of Samole (cm) 7.50 7.50Diameter (cm) 3.60 3.60Sec. Area of Sample (crn?) 10.17 10.17

    \t (Um3) 1.571 1.569Sr (o/o\ 98.49 98.69Gs 2.65 2.65O3 (kg/cm2) 0.50 1.00O1 (kgtcm2) 0.830 1.385c (ko/cm2) 0.13(p (o) 3

    0.0

    Eo.(,t)xEO'ooe, ^^o -'-

    0.00.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6

    Normal Stress {kg/cm2)

    Mohr - Diagram

    y = 0.0I 4x+ 0.1 12

    \(

  • 0r

    0203

    04

    05TA

    MPA

    K LA

    YOUT

    EXI

    STIN

    G\l/

    5,

    ALA

    I d

    +

    |t(D

    r*gl

    L;:g

    J i

    t+r_

    i

    71fr

    -r: 0t

    a2

    06

    --+

    .-T I +

    -

    fi N -L(-

    { 6

    Dr

    IJE a

    +

    6.10

    +

    03

    04

    l,l ll

    f:,

    IAY

    e.)I'T

    FXI

    STIN

    IC, -

    ,PA

    I]N

    NI

    06