CV Heru Susanto-June 2016

16
CURRICULUM VITAE 1. Personal Identification. Name : Heru Susanto, ST Birth/Place : Madiun, October 07, 1970 / East Java – Indonesia Nationality : Indonesia Languages : Indonesia and English Religion : Moslem Address : Jln Purwakarta 9 No 41 Antapani Bandung (40291) – West Java Indonesia Telp/ Hp : (+62)227279901, Hp. (+62)81268703800. Email Address : [email protected] , [email protected]. Passport No : A1083329, Expiry date : August 05, 2016. Marital Status : Married, with 4 children Graduated : Naval Architecture (construction & mechanical) ITS/ Engineer –1994 Computer : MS word, excel, autocad Job Title : Construction Supervisor, Inspection Supervisor, Engineer, Welding/Pipeline/Pipe Mill Inspector, Site Manager, Project Manager, Tank Inspector/supervisor, third party Migas, certification engineer Professional Membership : AWS, CSWIP, API 653, API 570, ASNT Level II-RI, UT, MT,PT : Welding Inspector : Local, Indonesian Welding Society (B4T) : Pipeline Inspector Migas, Indonesia Government. : Scaffolding Inspector Migas, Indonesia Government. Having more than 20 years in construction supervisor , Inspection & Quality Control including supervision & coordination, prepare quality control procedure and responsible for general quality control activities to confirm that they comply with specified procedure or Client requirement. Has served as Mechanical Engineer, QC Engineer, QC/Welding Inspector, Tank Inspector, Piping/Pipeline Inspector and Supervisor for Oil and Gas Project CV Heru Susanto, Rev. November , 2015Page 1 of 16

Transcript of CV Heru Susanto-June 2016

Page 1: CV Heru Susanto-June  2016

CURRICULUM VITAE

1. Personal Identification. Name : Heru Susanto, STBirth/Place : Madiun, October 07, 1970 / East Java – IndonesiaNationality : IndonesiaLanguages : Indonesia and EnglishReligion : MoslemAddress : Jln Purwakarta 9 No 41 Antapani Bandung (40291) – West Java

IndonesiaTelp/ Hp : (+62)227279901, Hp. (+62)81268703800.Email Address : [email protected], [email protected] No : A1083329, Expiry date : August 05, 2016.Marital Status : Married, with 4 childrenGraduated : Naval Architecture (construction & mechanical) ITS/ Engineer –1994Computer : MS word, excel, autocadJob Title : Construction Supervisor, Inspection Supervisor, Engineer,

Welding/Pipeline/Pipe Mill Inspector, Site Manager, Project Manager, Tank Inspector/supervisor, third party Migas, certification engineer

Professional Membership : AWS, CSWIP, API 653, API 570, ASNT Level II-RI, UT, MT,PT

: Welding Inspector : Local, Indonesian Welding Society (B4T): Pipeline Inspector Migas, Indonesia Government. : Scaffolding Inspector Migas, Indonesia Government.

Having more than 20 years in construction supervisor , Inspection & Quality Control including supervision & coordination, prepare quality control procedure and responsible for general quality control activities to confirm that they comply with specified procedure or Client requirement. Has served as Mechanical Engineer, QC Engineer, QC/Welding Inspector, Tank Inspector, Piping/Pipeline Inspector and Supervisor for Oil and Gas Project (Onshore and Offshore Project),third party, certification engineer. Brown Field Inspection.

2. Professional Training NDT ASNT UT level 2, course was conducted at NDE Center Surabaya, ITS. March,

2014. Expiry date : April 2019. Scaffolding Inspector, course was conducted by Migas Cepu, March, 2014.

Certificate : Expiry date : August 2017. NDT ASNT RI/MT/PT level 2, courses were conducted at NDE Center Surabaya,

ITS. September, 2013. Expiry : September 2018. API 570 Authorize Inspector for Piping Inspector Certificate no. 49307. Expiry date :

July 31, 2016. API 653 Authorize Inspector for above ground storage tank, Certificate no. 43899.

Expiry date : May 31, 2018. CSWIP 3.1, Certificate No.51519. Expiry Date : December 14, 2019. NDT Level II, Ultrasonic Testing. Certificate No. : AM 497. December, 2006, SME –

Surabaya

CV Heru Susanto, Rev. November , 2015 Page 1 of 10

Page 2: CV Heru Susanto-June  2016

Non Destructive Testing Course, Re-Radiographic Film Interpreter, B4T-Bandung, September, 2006. Certificate No. : 0706.23.103.

Non Destructive Testing Course, Penetrant Test and Magnetic Particle Inspection level II, SME Surabaya , December 1-13, 2005, Certificate No : AM 497/MT/II/PVT/XII/04 & AM 497/PT/II/PVT/XII/04

Non Destructive Testing Course, Radiographic Film Interpreter, B4T-Bandung, September, 2003. Certificate No. : 0903.23.103.

Welding Inspector AWS Course, conducted by AWS, November, 2000. Certificate with CWI no. : 00121691

Welding Inspector Course, B4T-Bandung (September 1998-December 1998) Pipeline Inspector Course, PPT MIGAS Cepu, Center Java, 1996.

3. Safety Training Tropical Basic Offshore and Safety Induction and Emergency Training. (HUET, Sea

Survival, Fire Fighting, First Aid And CPR. (Expired date : July 2017). Risk Awareness and prevention, in house training March 2014, SPS Total Indonesia. Basic Cause Tree Analysis (CTA), in house training March 2014, SPS Total

Indonesie. Gesture and Posture in house training, December , 2013, SPS Total Indonesie. Helicopter Underwater Escape Training (HUET), & Sea Survival Training, conducted

by PT Indosafe Pratama, Expiry Date : February 11, 2017. Basic First Aid & Basic Fire Fighting , conducted by PT Indosafe Pratama, Expiry

Date : December 20, 2016 Gas Tester Course. Certificate no. SPS/12/2012. In house training by Total Indonesie.

Expiry Date: 30-12-2012.

4. Work Experiences April 2015 – now.

YAMAL LNG Project, Sabeta Rusia. Through BV Phillipine and China.Fabrication Yard : AG&P Batangas Phillippine, and CPOE Qingdao China.Employed as QC Piping Lead, HSQC Piping, structural and NDT.Code/Standard : ASME B31.3, AWS D1.1.ASME IX, ASME SEC VIII, ASME SEC V, Project Spécification 300.Duties :1. Monitor and control the implementation of the approved QA/QC plan2. Ensure that qualified welders and welding operators are working in accordance to approved welding procedure.3. Review all procedures and queries related to WPS and coordinate with the Quality Coordinator.4. Witness and monitor of WPS/PQR for Piping activities.5. Supervise and monitor all QA/QC activities performed for construction, installation and pre-commissioning.6. Ensure that the works are closely inspected by the contractor’s QC inspection team (RT, UT, MT,PT, PMI etc).7. Submit a QC report to the Quality MAnager and Quality Coordinator,

when deviations are detected so that the contractor can be instructed to take

CV Heru Susanto, Rev. November , 2015 Page 2 of 10

Page 3: CV Heru Susanto-June  2016

corrective action.8. Monitor the progress of QA/QC activities on work sites and submit regular reports to Quality Coordinator.9. Report any anomalies to our hierarchical superiors.9. Review qualification of all NDT personnel and Welders.10. Ensure that contractors comply with QA/QC requirements regarding documentation filling, material and control traceability, and materials reception, storage and preservation.11. Ensure compliance on work sites with QA/QC rules and standards, and report any anomalies.12. Ensure awareness and compliance with HSE rules and regulations by subordinates and contractors.13. Carry out any other duties or tasks that may be assigned by our hierarchical superiors.14. Ensure feedbacks for project construction requirements and schedule.15. Supervise and control the project construction activities in piping activities in order to ascertain the plant will be built as per drawings, specification, procedures and schedule.16. Monitor the line of non conforming reporting and corrective actions.17. Coordinate Site, Yard and VENDOR premises of QA/QC activities.18. Review storage condition of raw material.19. Supervise CONTRACTOR inspection activities as per Inspection and Test Plans.20. Provide technical assistance and link QA/QC Coordinator to CONTRACTOR matters on site.21. Report every end of day to QA/QC Coordinator on piping progress, Non Conformance, and any shortcomings or major defect.22. Carry out walkthrough with all parties (Subcontractor, Quality Manager, and Client) to do observation, recommendation, and positive points.

November 2014 – April 2015.LNG Tangguh Papua through PT Bonne Indoteknik.Employed as QA/QC Multi Discipline Inspector.Project : Integrity Maintenance. Brown Field Inspection.Code/Standard : API 5 L, API 1104, ASME B31.4, ASME B31.8, ASME B31.3,

AWS D1.1.ASME SEC IX, ASME SEC VIII, API 650, API 653. API 570, API 510.

1. Verify UT thickness gauging of piping component , MT, PT and vessel to determine corrosion rate. Perform PT/MT to determine sound of defects and interprete film X-ray.

2. Performing visual inspection of piping installation including:• Verifying piping material identity (pipe, valves and fittings) and its conformance

to the installation drawings• Verifying that welding inspection has been performed and joints have been

released.• Verification that dimensions and alignment tolerances of the piping systems are

as per constructs specifications.

CV Heru Susanto, Rev. November , 2015 Page 3 of 10

Page 4: CV Heru Susanto-June  2016

3. In-process surveillance to verify compliance with specified piping erection procedure including flange alignments, torquing, cleanliness etc.

4. Performing piping walkdown inspection and completing punch lists. Verifying that punch list items have been dealt with in accordance with the contractual arrangements.

5. Reviewing and verifying completeness of piping test packages (hydro or pneumatic) prior to testing.

6. Witnessing final piping tests.7. Completing and endorsing all inspection records from initial inspection till final

acceptance of the piping systems.8. Maintaining interface with the Client (at the shop level) to ensure that all

contractual and code requirements are met as far as the inspection scope is concerned.

June 2014 – November 2014.SHELL Manufacturer Indonesia through PT Depriwangga.Employed as QA/QC Mechanical Inspector.Project : LOBP (Lube Oil Blending Plant) Monas Project, Marunda Center

Site. Code/Standard : API 5 L, API 1104, ASME B31.4, ASME B31.8, ASME B31.3,

AWS D1.1.ASME SEC IX, ASME SEC VIII, API 650, API 653. API 570.

Duties : 1. Verify material receiving report and welding consumables are in compliance with

the project requirement.2. Witness or review NDE (MT/PT/UT) and PWHT.3. Verify that the quality related site activities are accordance with the applicable

codes and standards.4. Review Inspection and Test Plan for tank. piping, pipeline and structural.5. Perform routine checks to ensure workmanship practices are correctly and

consistently applied.6. Peform walkthrough audit at fabrication workshop and aseembly area and evaluate

score of findings.7. Participate in the site internal and external site audits.8. Monitor disposition of all issued nonconformity report.9.Control all nonconformity reports and undertake remedial action.10.Ensure the quality control documentation is complied and competed for as-built

drawing.11. Review traceability welding history prior to testing.12. Witness Hydrostatic testing and pneumatic testing.13. Follow up on non conformance and corrective actions including administrative

verifications. May 2009 – June 2014.

Total E&P Indonesie through P.T Inspektindo PratamaEmployed as Maintenance Construction and inspection Supervisor Project : Maintenance for pipeline, piping and structural. Brown Field

Inspection

CV Heru Susanto, Rev. November , 2015 Page 4 of 10

Page 5: CV Heru Susanto-June  2016

Location : Delta Mahakam, Total E&P Indonesie onshore and offshore Site.Office : Jl. Jend.Sudirman Ruko Bandar Blok B-22 Balikpapan.Phone : (0542)739310, Code/Standard: API 5 L, API 1104, ASME B31.4, ASME B31.8, ASME B31.3,

AWS D1.1.ASME SEC IX, ASME SEC VIII, API 650, API 653. API 570, Total Specification,

Duties : 1. Experience inspection in static equipment.2. Reviewing welding maps, welding sequence and NDT plans for acceptance and

coordinating work with the NDT inspection of company.3. Regularly reviewing company specifications and ensurring these are known prior

to implementation.4. Providing assistance and gudance to all client team members on relevant matters,

including welding sequence E/I support and piping or temporary support.5. Implementing the release note system to ensure that the material and welder

traceability, dimensional control, and NDE are implemented and documented properly.6. Monitoring, instructing, correcting, and reporting the work practices of the

contractor where necessary.7. To supervise welding procedure qualification to be employed at site and the

qualifications of the welders operator within the plant, according to project specification and standards.8. To check that the field welds comply with project specification.9. To check the execution of NDT and PWHT that all repairs are performed correctly

and NDT are regularly repeated.10. To keep a report file for all NDT and PWHT performed.11.To obtain any necessary approval for channging, as appropriate, welding

procedures and for performing repairs requiring special procedures.12. To prepare his own section of the weekly report.13. Witness and document hydrostatic testing of vessels, piping, and pipelines.14. Witness vessel and pipeline flushing and gauging.

January, 2009 – May 2009.P.T. Sarku Enjinering Utama.Employed as QA/QC Supervisor.Project : Hook Up North Belut, WHP-D, and WHPC. Location : Natuna Sea. Conoco Phillips Inc.Office : Ciputat Raya No. 27i. Kel Pondok Pinang, Kebayoran Lama Jakarta

Selatan.Phone : (021) 75908641.Code/Standard : API 5 L, API 1104, ASME B31.4, ASME B31.8, API 570, API

650, and Conoco Phillips Specification.Duties :1. Verify Material, consumable certificate verification against actual, electrode

storage, etc.2. Inspection before welding : check material, edge preparation, welder, WPS, etc.

CV Heru Susanto, Rev. November , 2015 Page 5 of 10

Page 6: CV Heru Susanto-June  2016

3. Inspection during welding : verify welding parameter, check interpass temperature, 4. .Inspection after welding : Visual Inspection, proceed to welding report, etc5. Inspection after welding repair : ensure what kind of repair & NDT methods.6. Inspection after PWHT : Verify RT Film, Ensure that approved PWHT Procedure .7. Review and verify Welding record and traceability report.8. Verify Welding consumable log and Welding electrode oven register.9. Verify NDT map.10.Review WPS.11. Review Mechanical Testing /DT.12. Review Welder Qualification Records.

December, 2008 - January, 2009.P.T.Mafhindo Utama.Employed as a Certifying Authority Representative (Pipeline Inspector on behalf ofMIGAS (Indonesian Ministry Oil and Gas).Project : 36” Pipeline From ETIP 1 To SMP PLTM and 24” Pipeline From

GTS R and H To SMP PLTM. Location : SPU, East Kalimantan. Total Indonesie.Office : Wisma Harun, Jln. Raya Pasar Minggu no 2i, Jakarta.Code/Standard : API 5 L, API 1104, ASME B31.4, ASME B31.8, Total Specification, Duties : 1. Conduct all activities as certifying authority in relation with MIGAS Certification,

SKPP, SKPI. ( Indonesia Monistry Oil and Gas Certification ).2. Undertake Familiarization with Project and discipline specific Inspection of

Documents Project Specifications ITP's, Method statment, manuals and procedure to ensure contract requirement are met.

April 2007 - December 2008PT Irsindo Pratama (member of IRS Singapore)Employed as a Project Manager.Project : Long Range Ultrasonic Test Project.Location : Duri. Chevron Pacific Indonesia.Office : Perkantoran Grand Sudirman No D3, Jln Datuk Setia Maharaja

Pekanbaru, Telp/Fax (0761)7071564/22068Equipment Used : Teletest Focus from Plant Integrity TWI United Kingdom..

December 2005 - April 2007

P.T. Total E&P Indonesie, supplied by PT Surveyor Indonesia.Employed as a Quality Representative-Fabrication and installation Total E&P Indonesie.Project : 55 New Well Connection, maintenance for Tank, Pipeline, Piping,

and structural. Brown Field Inspection.Location : East Kalimantan. Total Indonesie.Office : Balikpapan, East Kalimantan.

CV Heru Susanto, Rev. November , 2015 Page 6 of 10

Page 7: CV Heru Susanto-June  2016

Code/Standard: API 5 L, API 1104, ASME B31.4, ASME B31.8, Total Specification, ASME B31.3, AWS D1.1.ASME SEC IX, ASME SEC VIII, API 650, API 653. API 570.Duties :1. Verify Material, consumable certificate verification against actual, electrod storage,

etc.2. Inspection before welding : check material, edge preparation, welder, WPS, etc.3. Inspection during welding : verify welding parameter, check interpass temperature, 4. .Inspection after welding : Visual Inspection, proceed to welding report, etc5. Inspection after welding repair : ensure what kind of repair & NDT methods.6. Inspection after PWHT : Verify RT Film, Ensure that approved PWHT Procedure .7. Review and verify Welding record and traceability report.8. Verify Welding consumable log and Welding electrode oven register.9. Verify NDT map.10.Review WPS.11. Review Mechanical Testing /DT.12. Review Welder Qualification Records.

January 2004 - December 2005.P.T. Barata Indonesia.Employed as a QA/QC engineer New Storage Tank , PT Barata Indonesia.Project : TPPI Tuban Aromatic Project.Welding Process : FCAW and SMAW.Roof : Fix Roof and Floating Roof.

a. Light Naptha Storage Tank = 2 ea.Dimension : 65.5 M diameter X 20.71 M height.

b. CTG Fuel Oil Tank = 3 ea.Dimension : 22.4 M diameter X 11.4 M height.

c. Condensate Storage Tank = 4 ea.Dimension : 22.4 M diameter X 11.4 M height.

Code/Standard : API 650, API 570, AWS D1.1, ASME IX, Project Specification.Duties : 1. Material, consumable certificate verification against actual, electrode storage, etc.2. Inspection before welding : check material, edge preparation, welder, WPS, etc.3. Inspection during welding : verify welding parameter, check interpass temperature.4. Inspection after welding : Visual Inspection, proceed to welding report, etc.5. Inspection after welding repair : ensure what kind of repair & NDT methods.6. Inspection after PWHT : Verify RT Film, Ensure that approved PWHT Procedure.7. Create welding record and traceability report.8. Verify welding consumable log and welding electrode oven register.9. Create NDT map.

October. 2003 - January, 2004P.T.Mafhindo Utama.Employed as a Certifying Authority Representative on behalf of MIGAS (Indonesian Ministry Oil and Gas).

CV Heru Susanto, Rev. November , 2015 Page 7 of 10

Page 8: CV Heru Susanto-June  2016

Project : a. Replacement of corroded trunk line MWP-A&B to Senipah, and additional Expansion Loop. TOTAL E&P INDONESIE, PCK SR /EPSC-1, 24” Diameter Pipeline. Contractor : SAIPEM. Barge : Castoro 2. b. Pipeline From GTS Y To NMP2, 20” diameter, push pull and laying offshore construction. Contractor : P.T. Punj Lloyd Indonesia. Barge : YUHETI 180.

Location : Senipah, Peciko, East Kalimantan. Total Indonesie.Office : Wisma Harun, Jln. Raya Pasar Minggu no 2i, Jakarta.Code/Standard : API 5 L, API 1104, ASME B31.4, ASME B31.8, Total Specification, Duties : : 1. Conduct all activities as certifying authority in relation with MIGAS Certification,

SKPP, SKPI. ( Indonesian Ministry Oil and Gas Certification ).2. Undertake Familiarization with Project and discipline specific Inspection of

Documents Project Specifications ITP's, Method statment, manuals and procedure to ensure contract requirement are met.

July. 2002 - August, 2003.P.T.GL Nusantara (Member of Germanischer Lloyd).Employed as a Certifying Authority Representative on behalf of MIGAS (Indonesian Ministry Oil and Gas).Project : Gas Transmission and Distribution Project, PGN’s Grissik to

Borderline Singapore Project. Pipeline from South Sumatera To Singapore, Spiral Pipe and Long Seam DSAW, Diameter 28”, onshore and offshore about 488 KM. Onshore Pipeline diameter 18”, Petrochina To Jabung Station 1.2 KM.

Location : Batam, Jambi, Palembang. P.T. PGN.Office : Jln. Letjend S. Parman Kav.35, Jakarta 11480, phone (021)5493353.Code/Standard : API 5 L, API 1104, ASME B31.4, ASME B31.8, DNV Spec.Duties :1. Conduct all activities as certifying authority in relation with MIGAS Certification,

SKPP, SKPI. ( Indonesian Ministry Oil and Gas Certification ).2. Undertake Familiarization with Project and discipline specific Inspection of

documents project Specifications ITP's, Method statment, manuals and procedure to ensure contract requirement are met.

3. Verify UT/MT/PT/RT equipment calibration certificates & review their reports.4. Review RT Film and Interpretation.5. Witness of calibration verification MT/PT/UT equipment & review of MT/PT/UT

reports.6. Perform of welding Inspection and verification of welding variable.7. Perform of material and chemistry verification.8. Witness of production mechanical testing such as tension, bending, charpy, macro

etsa, hardness, DWTT, Strength aging & Weld ability testing c/w review of report.9. Witness, verification of hydrostatic calibration gauge/master gauge against DWT.10. Perform of material tracking, identification and marking against inspection report.

CV Heru Susanto, Rev. November , 2015 Page 8 of 10

Page 9: CV Heru Susanto-June  2016

11. Monitoring of coating process & perform coating inspection a per MPS/ITP.12. Witness of transportation and load out.

April. 2001 - June, 2002.P.T.Irsindo Pratama Employed as a QA/QC Inspector on behalf of P.T. CALTEX PACIFIC IDONESIA supplied by P.T. Irsndo Pratama (member of IRS Singapore).Project : Pipeline Diameter 30,16, 12, 10, 8, 6, 4 inches, KOTABATAK WATER FLOOD AREA-3, Onshore Pipeline 82 KM.Location : Petapahan, Pekanbaru, RIAU. Caltex Pacific Indonesia.Office : Jln. Siaga II no. 36 Jakarta 12510 phone (021)7987976.Code/Standard : API 5 L, API 1104, ASME B31.4, ASME B31.8

Dec. 2000 - March, 2001.P.T.H&H Utama International.Employed as a QA/QC Inspector.Project : YAKIN CPP2 PROJECT, PLATFORM with 4 legs and 3 decks,

UNOCAL 76, Indonesia.Location : Batakan Kecil, Balikpapan.Office : Batakan Kecil, Balikpapan phone (0542)770111 ext 401.Code/Standard : AWS D1.1, ASME Sec. IX, ASME B31.3, Unocal Spec

May. 1999 - October, 2000.P.T.Gunanusa Utama Fabricators.Employed as a QA/QC Inspector.Project : COMPRESSOR PLATFORM (TCP DECK) Platform for TUNU

FIELD DEVELOPMENT PROJECT – TP-7 (TOTAL INDONESIE)Location : Cilegon, Banten. Office : Cilegon phone (0254)500088Code/Standard : AWS D1.1, ASME Section IX, ASME B31.3, ASME Section VIII

TOTAL Spec.

Dec. 1998 - May, 1999.P.T.Citra Indonesia.Employed as a QA/QC Inspector.Project : Pipeline Onshore 42”Diameter Gas Export Line, Peciko

Development Project EPSC 4, pipeline Badak To Senipah 86 KM.Location : Badak.Office : Balikpapan, East Kalimantan. Total Indonesie.Code/Standard : API 5 L, API 1104, ASME B31.4, ASME B31.8

Sept 1994 – April 1997P.T.Maju BersamaEmployed as a QA/QC for Pressure Vessel and Tank.Project : Pressure Vessels and Tank Inspection.

CV Heru Susanto, Rev. November , 2015 Page 9 of 10

Page 10: CV Heru Susanto-June  2016

Office : Tangerang.Code/Standard : ASME Section VIII, ASME Section IX, ASME Section V, API

650, API 653.9. References.

Haryo Wiryono M.Sc, M Eng.Director Deputy for Oil and Gas / General Manager for Industrial Services, Germanischer Lloyd Nusantara- Indonesia.Mobile Phone (+62)811 193 210.

Agus Sujana ([email protected]).General Manager PT Irsindo Pratama.Mobile Phone (+62)8127544949, (+62) 8127558292.

Jesi Flores ([email protected])Technical Representative ROW Maintenance Project TOTAL INDONESIE, FO/INS/PIMMobile Phone (+62)82159931240.

• Windu Brotoseno.I & F Manager (PT Bureau Veritas Indonesia).Mobile Phone (+62)8119104478.

Sincerely Yours,

( Heru Susanto)

CV Heru Susanto, Rev. November , 2015 Page 10 of 10