ANALISA SATUAN PEKERJAAN BOW Propinsi Kabupaten Kecamatan No Uraian Pekerjaan Satuan I Pekerjaan Tanah 1 Pembersiahan Lapangan/ 10 M2 Upah : Pekerja HOK 0.07 Mandor HOK 0.02 2 Pemasangan Bowplank / 10 M' Bahan: Papan Meranti Ton 0.05 Paku 2" Kg 2.00 Upah : Pekerja HOK 2.00 Tukang HOK 0.30 Mandor HOK 0.03 3 Galian tanah Biasa/M3 Upah: Pekerja HOK 0.75 Mandor HOK 0.03 No Uraian Pekerjaan Satuan II Pekerjaan Beton Bertulang 1 Beton Bertulang 1:2:3 /M3 Bahan: Kerikil 3/4 " M3 0.82 Pasir M3 0.54 Semen Zak 6.80 Upah : Pekerja HOK 3.60 Tukang HOK 1.20 Mandor HOK 0.18 Bahan Besi Besi Beton Kg 110.00 Kawat Beton Kg 2.00 Upah Besi: Pekerja HOK 9.00 Tukang HOK 9.00 Mandor HOK 3.00 - Cetakan Beton Bahan : Kayu Bekisting Ton 0.29 Paku Kg 4.00 Upah : Pekerja HOK 0.50 Tukang HOK 0.60 Mandor HOK 0.01 - Bongkar Bekisting Pekerja HOK 2.00 - Faktor Penggali Harga Sat. (Rp) Jumlah (Rp) Faktor Penggali Harga Sat. (Rp) Jumlah (Rp)

Transcript of Cth. Analisa, Rab, Jembatan Gantung

Page 1: Cth. Analisa, Rab, Jembatan Gantung

ANALISA SATUAN PEKERJAANBOW

Propinsi Kabupaten Kecamatan

No Uraian Pekerjaan Satuan Keterangan

I Pekerjaan Tanah1 Pembersiahan Lapangan/ 10 M2

Upah :Pekerja HOK 0.07 SwadayaMandor HOK 0.02

2 Pemasangan Bowplank / 10 M'Bahan:Papan Meranti Ton 0.05Paku 2" Kg 2.00

Upah :Pekerja HOK 2.00Tukang HOK 0.30Mandor HOK 0.03

3 Galian tanah Biasa/M3Upah:Pekerja HOK 0.75Mandor HOK 0.03

No Uraian Pekerjaan Satuan Keterangan

II Pekerjaan Beton Bertulang1 Beton Bertulang 1:2:3 /M3

Bahan:Kerikil 3/4 " M3 0.82Pasir M3 0.54Semen Zak 6.80

Upah :Pekerja HOK 3.60Tukang HOK 1.20Mandor HOK 0.18

Bahan BesiBesi Beton Kg 110.00Kawat Beton Kg 2.00 Harga bahan disesuaikan

(Harga dilokasi Kegiatan)Upah Besi:Pekerja HOK 9.00Tukang HOK 9.00Mandor HOK 3.00

-

Cetakan BetonBahan :Kayu Bekisting Ton 0.29Paku Kg 4.00 Harga bahan disesuaikan

(Harga dilokasi Kegiatan)Upah :Pekerja HOK 0.50Tukang HOK 0.60Mandor HOK 0.01

-

Bongkar BekistingPekerja HOK 2.00 -

Faktor Penggali

Harga Sat. (Rp)

Jumlah (Rp)

Total

(Rp)

( Termasuk Pemotongan Akar Pohon)

Faktor Penggali

Harga Sat. (Rp)

Jumlah (Rp)

Total

(Rp)

Page 2: Cth. Analisa, Rab, Jembatan Gantung

No Uraian Pekerjaan Satuan Keterangan

III Pekerjaan Plesteran1 Pekerjaan Pleseran 1:4 /M2

Bahan :Semen Zak 0.13 Harga bahan disesuaikanPasir M3 0.08 dengan RAB desa

(Harga dilokasi Kegiatan)Upah :Pekerja HOK 0.40Tukang HOK 0.15Mandor HOK 0.02

-

No Uraian Pekerjaan Satuan Keterangan

IV Pekerjaan Kayu1 Pekerjaan Gel Jembatan Kayu/Ton

Bahan:Kayu Kapur Ton 1.10

Upah :Pekerja HOK 5.00Tukang HOK 15.00Mandor HOK 0.25

2 Pekerjaan Lantai Jembatan Kayu /TonBahan : Harga bahan disesuaikanKayu Kapur Ton 1.10 dengan RAB desa

(Harga dilokasi Kegiatan)Upah :Pekerja HOK 4.00Tukang HOK 6.00Mandor HOK 0.2

-

No Uraian Pekerjaan Satuan Keterangan

V Pekerjaan Cat

1 Pekerjaan Cat Minyak/ 10 M2Bahan Cat Minyak Kg 2.75Kuas Cat Bh 0.1Alat Bantu Ls 1.00 Harga bahan disesuaikan

dengan RAB desaUpah: (Harga dilokasi Kegiatan)Pekerja HOK 0.67Mandor HOK 0.03

-

Faktor Penggali

Harga Sat. (Rp)

Jumlah (Rp)

Total

(Rp)

Faktor Penggali

Harga Sat. (Rp)

Jumlah (Rp)

Total

(Rp)

Faktor Penggali

Harga Sat. (Rp)

Jumlah (Rp)

Total

(Rp)

Page 3: Cth. Analisa, Rab, Jembatan Gantung
Page 4: Cth. Analisa, Rab, Jembatan Gantung

RENCANA ANGGARAN BIAYA PRASARANA

Propinsi : No RAB 01Kabupaten : Program :Kecamatan : Jenis Kegiatan Jembatan GantungDesa : Ukuran/Dimensi 80 m x 1,85 m

UraianVolume

SatuanHarga Satuan Jumlah Total

TotalDari

Dari DanaSwadaya Rp Rp1. BAHAN 1. Besi UNP 100mm x 6 m 22 - 22 Btg 5,856,4002. Besi UNP 65mm x 6 m 21 - 21 Btg 4,326,0003. Besi BBT 15,4 x 10 10 - 10 Btg 1,875,0004. Besi BBT 16 x 12 160 - 160 Btg 16,160,0005. Kawat beton 1 rol 25 - 25 Kg 190,0006. Tiang Pilon 8 " SCH 40 5 - 5 Btg 18,280,0007. Papan mal 7.5 - 7.5 m3 3,750,0008. Semen 100 - 100 sak 4,500,0009. Paku 6 - 6 Kg 48,00010.Kunci 1 - 1 Ls 4,50011.Besi BT 18mm P=10 m 22 - 22 Btg 5,120,00012.Paku 6 - 6 Kg 60,00013.Besi L 60x60x6 P = 6m 6 - 6 Btg 4,530,50014.Vesi L 70x70x7 P = 6m 6 - 6 Btg 1,878,00015.Pasir 96 - 96 m3 4,320,00016.Batu 59.5 - 59.5 m3 4,165,00017.Reng dan gelagar 1 - 1 Ls 50,00018.Paku 13 - 13 Kg 150,00019.Besi O 16mm P = 12 m 107 - 107 Btg 12,305,00020.Besi O 12mm P=12 m 25 - 25 Btg 1,675,00021.Semen 150 - 150 sak 6,450,00022.Batu 27 - 27 m3 1,960,00023.Paku 4 - 4 Kg 82,00024.Besi plat t=6 mm 276 - 276 m3 1,656,00025.Semen 150 - 150 sak 7,200,00026.Besi O 12 mm P = 12 m 5 - 5 Btg 375,00027.Besi UNP 4 - 4 Btg 1,060,00028.Besi pipa putih 4 - 4 Btg 2,200,00029.Besi L 20 - 20 Btg 3,100,00030.Cat 10 - 10 Kg 350,00031.Timer 5 - 5 Btl 24,00032.Paku 15 - 15 kg 135,00033.Kayu 2.5 - 2.5 m3 1,500,00034.Spendrat 6 - 6 bh 222,00035.Baut 1/2x2 " 250 - 250 bh 500,00036.Kawat pengikat 3 - 3 Kg 36,00037.Besi L 12x10mm 4 - 4 Btg 208,00038.Baut 1/2x1,5 " 130 - 130 bh 325,00039.Baut 1/2x5" 75 - 75 bh 412,50040.Baut 3/8x2" 300 - 300 bh 360,00041.Baut 5/16x3" 100 - 100 bh 130,00042.Baut 3/8x2" 800 - 800 bh 1,200,00043.Reng 9 mm 1,000 - 1,000 bh 750,00044.Klem 1,5 " 16 - 16 bh 768,00045.Klem O 16 mm 18 - 18 bh 360,00046.Spendrat 12 mm 12 - 12 bh 210,00047.Sling 1 1/4 " 260 - 260 m' 26,000,00048.Sling 16 mm 243 - 243 m' 7,776,00049.Spendrat 16 mm 6 - 6 bh 285,00050.Baut 1/2x2" 250 - 250 bh 687,50051.Paku 10.5 - 10.5 kg 185,00052.Klem penggantung hanger 98 - 98 bh 5,439,00053.Sling 14 mm 100 - 100 m' 2,500,00054.Spendrat besar 8 - 8 bh 360,00055.Klem O 14 mm 30 - 30 bh 360,000

Page 5: Cth. Analisa, Rab, Jembatan Gantung

56.Gomok sling 15 - 15 kg 200,00057.Baut 12 mm 63 - 63 bh 189,00058.Klem slin 1 1/4 " 24 - 24 bh 480,00059.Plat strip tebal & ring 1 - 1 ls 82,00060.Klem sling utama 4 - 4 bh 1,000,00061.Kayu gelagar dan tiang 1 - 1 ls 400,00062.Cat 1 - 1 kg 131,60063.Papan lantai kayu kls I 3 3 - m3 2,850,000

Sub Total 1 169,742,0002.ALAT1. Mobilisasi - 2,700,0002. Ongkos langsir semen - 300,0003. Skop 3 - 3 ls 75,0004. Kakak tua 2 - 2 ls 20,0005. Ember cor 4 - 4 bh 16,0006. Terpal 3 - 3 bh 10,0007. Ongkos - bh 9,0008. Langsir besi - m' 20,0009. Mata gergaji 5 - 5 ls 10,00010.Kikir 1 - 1 ls 8,00011.Batu asah 1 - 1 bh 9,00012.Slang 20 - 20 bh 14,00013.Kapak 1 - 1 bh 25,00014.Terpal 11 - 11 m' 44,00015.Buku panjang 1 - 1 bh 5,00016.Gergaji stanlex 10 - 10 m' 100,00017.Mobilisasi besi - ls 300,00018.Angkung 2 - 2 unit 271,50019.Langsir besi - ls 375,00020.Mobilisasi besi - ls 350,00021.Mobilisasi besi - ls 300,00022.Carter pompong 3 - 3 hari 550,00023.Langsir semen/besi - ls 650,00024.Kuas 4 - 4 bh 60,00025.Rental mesin - hari 160,00026.Mobilisasi besi - ls 800,00027.Bongkar muat - ls 850,00028.Prasasti - ls 300,000

Sub Total 2 8,331,5003.UPAH1. Pekerja 419.43 - 419.43 HOK 14,680,0002. Tukang 618 - 618 HOK 30,900,0003. Mandor 56 - 56 HOK 3,640,000

Sub Total 3 49,220,000

Sumber DanaDari PPK 227,293,500Total Biaya 2,850,000

Tgl.

Disetujui Oleh Di Buat OlehPjOK Ketua TPK FK/FT

( FERISMAN A.S.SOS) (M U L A D I ) DEWI ANDAYANI, ST

Page 6: Cth. Analisa, Rab, Jembatan Gantung
Page 7: Cth. Analisa, Rab, Jembatan Gantung
Page 8: Cth. Analisa, Rab, Jembatan Gantung

Program Pengembangan Kecamatan

REKAPITULASI ANGGARAN BIAYA PRASARANA

PropinsiKabupaten

No Uraian

Kegiatan : Jembatan Gantung Kegiatan Ukuran : 80 m x 1,85 m Bobot Ukuran BobotJumlah : 1 unit % Jumlah %No.RAB : 01 No.RAB

PPK Swadaya PPK Swadaya

I BAHAN 166,892,000 2,850,000 74.36

tidak dirinci

II PERALATAN 8,331,500 0 3.71

tidak dirinci

III UPAH 49,220,000 0 21.93

tidak dirinci

Jumlah 224,443,500 95

IV Operasional UPK 2 % 4,725,126 2 2

V Operasional TPK 3 % 7,087,689 3

Jumlah Total 236,256,316 100

Jumlah Biaya Upah 49,220,000

Jumlah HOK Kontruksi 1093.43 Hok Hok

FK/FT PjOk

DEWI ANDAYANI, ST F E R I S M A N, S.SOS

Page 9: Cth. Analisa, Rab, Jembatan Gantung

REKAPITULASI ANGGARAN BIAYA PRASARANA

Kegiatan

Jumlah Total

Ukuran Bobot BobotJumlah % %No.RAB

PPK Swadaya PPK Swadaya

166,892,000 2,850,000 70.64

8,331,500 0 3.53

49,220,000 0 20.83

224,443,500 2,850,000 95.00

4,725,126 2

7,087,689 3

236,256,316 100

49,220,000 22

Hok 1093.43 Hok

TglPjOk Ketua TPK

F E R I S M A N, S.SOS M U L A D I