Contoh Jurnal jurnal yang terkait dengan Pengakuan...

20
44 Lampiran 1 Contoh Jurnal jurnal yang terkait dengan Pengakuan Pendapatan MEMORIAL VOUCHER PT. RANTE MUTIARA INSANI NO. VOUCHER M-ABC0001 MEMORIAL VOUCHER DATE 01.02.12 - 1 AR. PT ABC 10.500.000 AR. PT ABC / PPh 23 500.000 Over Bourden 3.000.000 Coal Hauling 5.000.000 Coal Getting 2.000.000 PPN Out 1.000.000 001/INV/RMI-ABC/I/2012 Periode : January-12 11.000.000 11.000.000 PROPOSED BY CHECKED BY INPUT BY PT. RANTE MUTIARA INSANI NO. VOUCHER M-ABC0002 MEMORIAL VOUCHER DATE 01.02.12 - 1 AR. PT ABC 15.750.000 AR. PT ABC / PPh 23 750.000 Rental Unit Komatsu D85 15.000.000 PPN Out 1.500.000 002/INV/RMI-ABC/I/2012 Periode : January-12 16.500.000 16.500.000 PROPOSED BY CHECKED BY INPUT BY PT. RANTE MUTIARA INSANI NO. VOUCHER M-ABC0003 MEMORIAL VOUCHER DATE 01.02.12 - 1 AR. PT ABC 21.000.000 AR. PT ABC / PPh 23 1.000.000 Pembuatan Bundwall, Parking Bay 20.000.000 PPN Out 2.000.000 003/INV/RMI-ABC/I/2012 Periode : January-12 22.000.000 22.000.000 PROPOSED BY CHECKED BY INPUT BY APPROVED BY APPROVED BY APPROVED BY NO. DESCRIPTION ACCOUNT DEBET KREDIT TOTAL NO. DESCRIPTION ACCOUNT DEBET KREDIT TOTAL NO. DESCRIPTION ACCOUNT DEBET KREDIT TOTAL

Transcript of Contoh Jurnal jurnal yang terkait dengan Pengakuan...

Page 1: Contoh Jurnal jurnal yang terkait dengan Pengakuan …repository.uksw.edu/bitstream/123456789/2642/3/T1_232008091... · Contoh Jurnal – jurnal yang ... PRODUCTION PAYMENT SUMMARY

44

Lampiran 1

Contoh Jurnal – jurnal yang terkait dengan Pengakuan Pendapatan

MEMORIAL VOUCHER

PT. RANTE MUTIARA INSANI NO. VOUCHER :M-ABC0001

MEMORIAL VOUCHER DATE :01.02.12

-

1 AR. PT ABC 10.500.000

AR. PT ABC / PPh 23 500.000

Over Bourden 3.000.000

Coal Hauling 5.000.000

Coal Getting 2.000.000

PPN Out 1.000.000

001/INV/RMI-ABC/I/2012 Periode : January-12

11.000.000 11.000.000

PROPOSED BY CHECKED BY INPUT BY

PT. RANTE MUTIARA INSANI NO. VOUCHER :M-ABC0002

MEMORIAL VOUCHER DATE :01.02.12

-

1 AR. PT ABC 15.750.000

AR. PT ABC / PPh 23 750.000

Rental Unit Komatsu D85 15.000.000

PPN Out 1.500.000

002/INV/RMI-ABC/I/2012 Periode : January-12

16.500.000 16.500.000

PROPOSED BY CHECKED BY INPUT BY

PT. RANTE MUTIARA INSANI NO. VOUCHER :M-ABC0003

MEMORIAL VOUCHER DATE :01.02.12

-

1 AR. PT ABC 21.000.000

AR. PT ABC / PPh 23 1.000.000

Pembuatan Bundwall, Parking Bay 20.000.000

PPN Out 2.000.000

003/INV/RMI-ABC/I/2012 Periode : January-12

22.000.000 22.000.000

PROPOSED BY CHECKED BY INPUT BYAPPROVED BY

APPROVED BY

APPROVED BY

NO. DESCRIPTION ACCOUNT DEBET KREDIT

TOTAL

NO. DESCRIPTION ACCOUNT DEBET KREDIT

TOTAL

NO. DESCRIPTION ACCOUNT DEBET KREDIT

TOTAL

Page 2: Contoh Jurnal jurnal yang terkait dengan Pengakuan …repository.uksw.edu/bitstream/123456789/2642/3/T1_232008091... · Contoh Jurnal – jurnal yang ... PRODUCTION PAYMENT SUMMARY

45

BANK VOUCHER

PT. RANTE MUTIARA INSANI NO. VOUCHER : B01-0001

BANK VOUCHER DATE : 15.03.12

-

1 Bank Sendiri Tanjung 49.500.000

AR. PT ABC

001/INV/RMI-ABC/I/2012 11.000.000

002/INV/RMI-ABC/I/2012 16.500.000

003/INV/RMI-ABC/I/2012 22.000.000

49.500.000 49.500.000

NO. DESCRIPTION ACCOUNT DEBET KREDIT

TOTAL

Page 3: Contoh Jurnal jurnal yang terkait dengan Pengakuan …repository.uksw.edu/bitstream/123456789/2642/3/T1_232008091... · Contoh Jurnal – jurnal yang ... PRODUCTION PAYMENT SUMMARY

46

Lampiran 2

Format Laporan Laba Rugi PT. RMI

PT. RANTE MUTIARA INSANI

LABA RUGI

Periode 31 Desember 20X1

Nilai

(Bulan Berjalan)

% Nilai

(Kumulatif)

%

Pendapatan

Jasa Pertambangan xxxx xxxx

Pendapatan Proyek xxxx xxxx

Pendapatan Rental xxxx xxxx

Total Pendapatan xxxx xxxx

Biaya Operasional Proyek

Biaya Operasional Proyek

Beban Operasional Langsung xxxx xxxx

Total Biaya Operasional Proyek

Total Biaya Operasional Proyek

xxxx xxxx

Laba / Rugi Operasional xxxx xxxx

Biaya Operasional Umum

Beban Usaha

Biaya Operasional Umum xxxx xxxx

Total Biaya Operasional Umum xxxx xxxx

Laba / Rugi Operasional xxxx xxxx

Pendapatan dan Beban Lain – lain

Pendapatan dan Beban Lain - lain

Pendapatan Bunga xxxx xxxx

Pendapatan Lain – lain

xxxx xxxx

Laba Selisih Kurs xxxx xxxx

Rugi Selisih Kurs (xxxx) (xxxx)

Beban Bunga (xxxx) (xxxx)

Biaya Lain – lain (xxxx) (xxxx)

Total Pendapatan dan Beban Lain - lain xxxx xxxx

Laba Rugi Sebelum Pajak xxxx xxxx

Biaya Pajak

Biaya Pajak

Biaya Pajak (PPH 29) xxxx xxxx

Total Biaya Pajak xxxx xxxx

Laba Rugi Bersih xxxx xxxx

Page 4: Contoh Jurnal jurnal yang terkait dengan Pengakuan …repository.uksw.edu/bitstream/123456789/2642/3/T1_232008091... · Contoh Jurnal – jurnal yang ... PRODUCTION PAYMENT SUMMARY

47

Lampiran 3

Contoh Matrik Harga Produksi

TABEL 1 : OB RATES FOR MONTHLY PRODUCTION (US $)

HORIZONTAL DISTANCE (M)

500 1.000 1.500 2.000 2.500 3.000 3.500

VER

TIC

AL

DIS

TAN

CE

(M)

0 1,00 1,10 1,20 1,30 1,40 1,50 1,60

10 1,02 1,12 1,22 1,32 1,42 1,52 1,62

20 1,04 1,14 1,24 1,34 1,44 1,54 1,64

30 1,06 1,16 1,26 1,36 1,46 1,56 1,66

40 1,08 1,18 1,28 1,38 1,48 1,58 1,68

50

1,20 1,30 1,40 1,50 1,60 1,70

60

1,22 1,32 1,42 1,52 1,62 1,72

70

1,34 1,44 1,54 1,64 1,74

80

1,36 1,46 1,56 1,66 1,76

90

1,38 1,48 1,58 1,68 1,78

100

1,40 1,50 1,60 1,70 1,80

rmi

PT RANTE MUTIARA INSANI

General Contractor & Supplier

Jl. Belimbing D III/13 Komperta Murung Pudak

Tanjung – Tabalong 71571, Kalimantan Selatan,

Indonesia

Phone +62 526 2021301, 2023744 Fax: +62 526

2023747

Page 5: Contoh Jurnal jurnal yang terkait dengan Pengakuan …repository.uksw.edu/bitstream/123456789/2642/3/T1_232008091... · Contoh Jurnal – jurnal yang ... PRODUCTION PAYMENT SUMMARY

48

Lampiran 4

Paringin, 9 Februari 2012

Nomor : 001/INV/RMI-ABC/II/12

Lampirann : 1. Invoice

2. Kwitansi

3. Faktur Pajak

Perihal : Permintaan Pembayaran

Overburden, Coal Mining dan Coal Hauling to Kelanis

Kepada Yth,

PT. ABC Indonesia

Jalan Patimura, Blok 5, Kav 1-2

Salatiga, Indonesia.

Dengan hormat,

Bersama dengan ini kami sampaikan bahwa pekerjaan untuk bulan Januari 2012

telah selesai kami kerjakan.

Maka dengan ini kami mengajukan permintaan pembayaran sebesar :

Terbilang : Dua puluh dua milyar sembilan ratus lima puluh lima juta dua ratus

delapan puluh empat ribu dua ratus tujuh puluh lima rupiah

Mohon supaya ditransfer ke rekening kami A/C No. 031.009.653.0038 pada Bank

Sendiri Cabang Tanjung A/N PT. Rante Mutiara Insani.

Demikian dari kami, atas perhatian dan persetujuan dari Bapak kami ucapkan

terima kasih.

Hormat kami,

PT. Rante Mutiara Insani

Guno Gumilang

Operation Manager

rmi

PT RANTE MUTIARA INSANI

General Contractor & Supplier

Jl. Belimbing D III/13 Komperta Murung Pudak

Tanjung – Tabalong 71571, Kalimantan Selatan,

Indonesia

Phone +62 526 2021301, 2023744 Fax: +62 526

2023747

CONTOH

Page 6: Contoh Jurnal jurnal yang terkait dengan Pengakuan …repository.uksw.edu/bitstream/123456789/2642/3/T1_232008091... · Contoh Jurnal – jurnal yang ... PRODUCTION PAYMENT SUMMARY

49

Lampiran 5

Invoice : 001/INV/RMI-ABC/II/12

PRODUCTION PAYMENT SUMMARY

Period : Januari 2012

No Description Amount IDR

A PARINGIN PIT

1

2

3

Overburden

((300,000 BCM x $ 1,00 ) + ( 200,000 BCM x $ 1,50)) x Rp.

9.500

Coal Mining

1000 TON x $ 1,25 x Rp. 9.500

Coal Hauling

((1000 TON x $0 ,50 ) + ( $ 0,40 x 1000 TON x 5.000 KM)) x

Rp. 9.500

2.850.300.000

11.875.000

19.000.000.500

SUBTOTAL 21.862.175.500

PPN 5% 1.093.108.775

TOTAL 22.955.284.275

Tanjung, 9 Februari 2012

PT. ABC INDONESIA PT. ABC INDONESIA PT. RANTE MUTIARA INSANI

Approved By, Approved By, Approved By,

SURYONO MUSLIH GUNO GUMILANG

General Operation Manager Deputy GM. Strategic Planing Operation Manager

rmi

PT RANTE MUTIARA INSANI

General Contractor & Supplier

Jl. Belimbing D III/13 Komperta Murung Pudak

Tanjung – Tabalong 71571, Kalimantan Selatan,

Indonesia

Phone +62 526 2021301, 2023744 Fax: +62 526

2023747

CONTOH

Page 7: Contoh Jurnal jurnal yang terkait dengan Pengakuan …repository.uksw.edu/bitstream/123456789/2642/3/T1_232008091... · Contoh Jurnal – jurnal yang ... PRODUCTION PAYMENT SUMMARY

50

Lampiran 6

KWITANSI

Sudah terima dari : PT. ABC INDONESIA

Banyaknya uang : Dua puluh dua milyar sembilan ratus lima puluh lima juta

dua ratus delapan puluh empat ribu dua ratus tujuh puluh

lima rupiah

Untuk pembayaran : Pekerjaan Overburden, Coal Mining, dan Coal Hauling

bulan Februari 2012.

Rp.

rmi

PT RANTE MUTIARA INSANI

General Contractor & Supplier

Jl. Belimbing D III/13 Komperta Murung Pudak

Tanjung – Tabalong 71571, Kalimantan Selatan,

Indonesia

Phone +62 526 2021301, 2023744 Fax: +62 526

2023747

CONTOH

Tanjung, 9 Februari 2012 PT. Rante Mutiara Insani

Guno Gumilang Operation Manager

22.955.284.275

Page 8: Contoh Jurnal jurnal yang terkait dengan Pengakuan …repository.uksw.edu/bitstream/123456789/2642/3/T1_232008091... · Contoh Jurnal – jurnal yang ... PRODUCTION PAYMENT SUMMARY

51

Lampiran 7

Invoice : 001/INV/RMI-ABC/II/12

MINING SUMMARY SHEET

Period : Januari 2012

No Description Quantity

This Month Year to Date

A. PARINGIN PIT

1 Overburden Removal (BCM)

Paringin Mine

Transport Distance (m)

Vertical Distance (m)

30,000

200,000

1,500

45,00

150,000

500,000

2 Coal Mining(Ton)

Transport Distance (m)

Vertical Distance (m)

1,000

3,000

55,00

45,000

3 Coal Hauling(Ton)

Paringin Mine

Transport Distance (km)

1,000

1,000

5,000

3,000

PT. ABC INDONESIA PT. RANTE MUTIARA INSANI

Checked By, Checked By,

MUSLIH GUNO GUMILANG

Deputy GM. Strategic Planing Operation Manager

Date : Date :

rmi

PT RANTE MUTIARA INSANI

General Contractor & Supplier

Jl. Belimbing D III/13 Komperta Murung Pudak

Tanjung – Tabalong 71571, Kalimantan Selatan,

Indonesia

Phone +62 526 2021301, 2023744 Fax: +62 526

2023747

CONTOH

Page 9: Contoh Jurnal jurnal yang terkait dengan Pengakuan …repository.uksw.edu/bitstream/123456789/2642/3/T1_232008091... · Contoh Jurnal – jurnal yang ... PRODUCTION PAYMENT SUMMARY

52

Lampiran 8

REKAPITULASI BIAYA PEKERJAAN

MINE INFRASTRUCTURE DEPARTMENT

Uraian Pekerjaan : Capex

Cost Code : 178.20.15

Periode : 26 Januari s/d 25 Februari 2012

Nama Kontraktor : PT. Rante Mutiara Insani

No. Uraian Pekerjaan Volume Satuan

Harga Satuan

(Rp)

Jumlah Biaya

(Rp) Keterangan

1 Haul Road Wara to North Tutupan

Compactor C150 150 jam 100.000 15.000.000

Excavator CAT 330 50 jam 50.000 2.500.000

Sub Total I 17.500.000

2 Haul Road HW Construction

Compactor C150 55 jam 100.000 5.500.000

Dump Truck CWB 340 35 jam 25.000 875.000

Sub Total II 6.375.000

3 Public Road Highwall Relocation

Compactor C150 25 jam 100.000 2.500.000

Backhoe JCB/MF 02 45 jam 35.000 1.575.000

Sub Total III 4.075.000

SUB TOTAL 27.950.000

PPn 5% 1.397.500

TOTAL 29.347.500

Supplied by,

Approved by,

PT. Rante Mutiara Insani

PT. ABC Indonesia

Guno Gumilang

Hendra

Operation Manager

Mine Civilwork Superintendent

CONTOH

Page 10: Contoh Jurnal jurnal yang terkait dengan Pengakuan …repository.uksw.edu/bitstream/123456789/2642/3/T1_232008091... · Contoh Jurnal – jurnal yang ... PRODUCTION PAYMENT SUMMARY

53

Lampiran 9

Monthly Equipment Time Sheet

Periode : 01 – 31 Januari 2012

PT. Rante Mutiara Insani

Job Site : PT. ABC Indonesia Equipment No : XE 100 S

Unit Produksi : Kobelco SK 330 Serial No : -

Contract No : 001/ABC/K/MAT/I/2012

Salatiga, 1 Februari 2012

Dibuat Oleh, Disetujui Oleh, Disetujui Oleh,

PT. Rante Mutiara Insani PT. ABC Indonesia PT. ABC Indonesia

Guno Gumilang Putra Atma

Operation Manager Coal Transport Section Head Enginering Manager

CONTOH

Page 11: Contoh Jurnal jurnal yang terkait dengan Pengakuan …repository.uksw.edu/bitstream/123456789/2642/3/T1_232008091... · Contoh Jurnal – jurnal yang ... PRODUCTION PAYMENT SUMMARY

54

Lampiran 10

BERITA ACARA PRODUKSI

No: 001/BAP/RMI-ABC/I/12

Period : Januari 2012

Contact No : 001/ABC/K/MAT/I/2012

No Description

Total

WH

Price/WH

(USD)

Ammount

(USD)

1 Excavator Kobelco EX 100 s 50,00 20,00 1,000

Sub Total 1,000

PPN 10% 100

Grand Total 1,100

Salatiga, 1 Februari 2012

PT. ABC INDONESIA PT. RANTE MUTIARA INSANI

Approved By, Prepared By,

SAPTO GUNO GUMILANG

Production Manager Operation Manager

rmi

PT RANTE MUTIARA INSANI

General Contractor & Supplier

Jl. Belimbing D III/13 Komperta Murung Pudak

Tanjung – Tabalong 71571, Kalimantan Selatan,

Indonesia

Phone +62 526 2021301, 2023744 Fax: +62 526

2023747

CONTOH

Page 12: Contoh Jurnal jurnal yang terkait dengan Pengakuan …repository.uksw.edu/bitstream/123456789/2642/3/T1_232008091... · Contoh Jurnal – jurnal yang ... PRODUCTION PAYMENT SUMMARY

55

Lampiran 11

CONTOH

Page 13: Contoh Jurnal jurnal yang terkait dengan Pengakuan …repository.uksw.edu/bitstream/123456789/2642/3/T1_232008091... · Contoh Jurnal – jurnal yang ... PRODUCTION PAYMENT SUMMARY

56

Lampiran 12

BERITA ACARA JOINT SURVEY

PT. ABC INDONESIA

DENGAN

PT. RANTE MUTIARA INSANI PROGRESS : JANUARI 2012

Pada hari ini, Senin tanggal 1 bulan Februari tahun 2012. Telah dilaksanakan

penandatanganan berita acara joint survey over burden removal dengan penjelasan

sebagai berikut :

- Berdasarkan : Perjanjian jasa penambangan batubara tanggal

1 januari 2008 antara PT. ABC Indonesia

dengan PT. Rante Mutiara Insani

- Progress pekerjaan : Januari 2012

- Pelaksanaan joint survey : 31 Januari 2012

- Volume OB removal : 100,000.00 bcm

- Jarak angkut OB : 1000 m

- Volume coal getting : 10,000 ton

- Jarak angkut batubara : 8.000 km

Terlampir peta progress dan data pendukung lainnya.

Demikian berita acara ini dibuat dengan sesungguhnya untuk dapat dipergunakan

sebagaimana perlunya.

PT. Rante Mutiara Insani PT. ABC Indonesia

Muchlis Abduloh Susilo Husodo

Deputy Operation Manager Prod. Eng. Section Head

Mengetahui,

Sandoro Adi Prakoso

Operation Manager

CONTOH

Page 14: Contoh Jurnal jurnal yang terkait dengan Pengakuan …repository.uksw.edu/bitstream/123456789/2642/3/T1_232008091... · Contoh Jurnal – jurnal yang ... PRODUCTION PAYMENT SUMMARY

57

Lampiran 13

Invoice : 001/INV/RMI/ABC/MINING/I/2012

PRODUCTION PAYMENT SUMMARY

Period : Januari 2012

No Job Description Volume Unit Rate Total

Sudirman PIT (Rp) (Rp)

1 Over Burden

100 Ton 100.000 10.000.000

2 Coal Mining

500 Ton 150.000 75.000.000

3 Coal Hauling

Transportation

(100 Ton x 50Km )

100

5000

Ton

Ton/Km

50.000

10.000

5.000.000

50.000.000

SUBTOTAL 140.000.000

PPN 5% 7.000.000

GRAND TOTAL 147.000.000

Tanjung, 9 Februari 2012

PT. ABC INDONESIA PT. ABC INDONESIA PT. RANTE MUTIARA INSANI

Approved By, Approved By, Approved By,

SURYONO MUSLIH GUNO GUMILANG

General Operation Manager Deputy GM. Strategic Planing Operation Manager

rmi

PT RANTE MUTIARA INSANI

General Contractor & Supplier

Jl. Belimbing D III/13 Komperta Murung Pudak

Tanjung – Tabalong 71571, Kalimantan Selatan,

Indonesia

Phone +62 526 2021301, 2023744 Fax: +62 526

2023747

SARAN

Page 15: Contoh Jurnal jurnal yang terkait dengan Pengakuan …repository.uksw.edu/bitstream/123456789/2642/3/T1_232008091... · Contoh Jurnal – jurnal yang ... PRODUCTION PAYMENT SUMMARY

58

Lampiran 14

Invoice : 001/INV/RMI/ABC/CONST/I/2012

Working Summary Sheet

Period : Januari 2012

No Job Description Volume Unit Rate Total

Sudirman PIT (Rp) (Rp)

1 Perbaikan jalan

menuju lokasi

tambang Sudirman

PIT

20 Km 100.000 2.000.000

2 Pembuatan Kolam

Penampungan air

5000 M3 50.000 250.000.000

SUBTOTAL 252.000.000

PPN 5% 12.600.000

GRAND TOTAL 264.600.000

Tanjung, 9 Februari 2012

PT. ABC INDONESIA PT. RANTE MUTIARA INSANI

Supplied By, Approved By,

SURYONO GUNO GUMILANG

Mine Civilwork Superintenden Operation Manager

rmi

PT RANTE MUTIARA INSANI

General Contractor & Supplier

Jl. Belimbing D III/13 Komperta Murung Pudak

Tanjung – Tabalong 71571, Kalimantan Selatan,

Indonesia

Phone +62 526 2021301, 2023744 Fax: +62 526

2023747

SARAN

Page 16: Contoh Jurnal jurnal yang terkait dengan Pengakuan …repository.uksw.edu/bitstream/123456789/2642/3/T1_232008091... · Contoh Jurnal – jurnal yang ... PRODUCTION PAYMENT SUMMARY

59

Lampiran 15

PRODUCTION SUMMARY

No: 001/BAP/RMI/ABC/RENT/I/2012

Working Period : Januari 2012

Contract Number : -

Invoice Number : 001/INV/RMI/ABC/RENT/I/2012

No Unit Used

Total

WH

Price/WH

(Rp)

Total

(Rp)

1 Excavator Kobelco EX 100 s 50,00 100.000 5.000.000

Sub Total 5.000.000

PPN 10% 500.000

Grand Total 5.500.000

Salatiga, 1 Februari 2012

PT. ABC INDONESIA PT. RANTE MUTIARA INSANI

Approved By, Prepared By,

SAPTO GUNO GUMILANG

Production Manager Operation Manager

rmi

PT RANTE MUTIARA INSANI

General Contractor & Supplier

Jl. Belimbing D III/13 Komperta Murung Pudak

Tanjung – Tabalong 71571, Kalimantan Selatan,

Indonesia

Phone +62 526 2021301, 2023744 Fax: +62 526

2023747

SARAN

Page 17: Contoh Jurnal jurnal yang terkait dengan Pengakuan …repository.uksw.edu/bitstream/123456789/2642/3/T1_232008091... · Contoh Jurnal – jurnal yang ... PRODUCTION PAYMENT SUMMARY

60

Lampiran 16

Page 18: Contoh Jurnal jurnal yang terkait dengan Pengakuan …repository.uksw.edu/bitstream/123456789/2642/3/T1_232008091... · Contoh Jurnal – jurnal yang ... PRODUCTION PAYMENT SUMMARY

61

Lampiran 17

DAFTAR RIWAYAT HIDUP

Nama Lengkap : Mahatma Hendranata Saputra

Jenis Kelamin : Laki-laki

Tempat/Tanggal Lahir : Boyolali, 19 Januari 1990

Agama : Kristen

Alamat Domisili : Jalan Perintis Kemerdekaan, Bangunharjo,

RT 07 RW II, Bangunharjo, Pulisen,

Boyolali

Status : Belum Kawin

Telp. : 085643747539

Email : [email protected]

Nama Orang Tua

Nama Ayah : Hendratmoko

Nama Ibu : Sri Rahayuningsih

INFORMASI PENDIDIKAN

Pendidikan Nama Institusi Kota Tahun Lulus Jurusan

SD SD Pulisen Boyolali 2002

SMP SMP Negeri 1 Boyolali 2005

SMA SMA Negeri 1 Boyolali 2008 IPS

S1 Universitas Kristen

Satya Wacana

Salatiga 2012 Akuntansi

PENGALAMAN PRIBADI

Pengalaman Keterangan Tahun

Sertifikasi 1. Brevet Pajak A & B Fakultas

Ekonomika dan Bisnis UKSW.

2012

Page 19: Contoh Jurnal jurnal yang terkait dengan Pengakuan …repository.uksw.edu/bitstream/123456789/2642/3/T1_232008091... · Contoh Jurnal – jurnal yang ... PRODUCTION PAYMENT SUMMARY

62

Pengalaman Organisasi 1. Divisi Eksternal Himpunan

Mahasiswa Program Studi Kelompok

Studi Akuntansi – Senat Mahasiswa

Fakultas Ekonomika dan Bisnis

2. Divisi Internal Himpunan Mahasiswa

Program Studi Kelompok Studi

Akuntansi – Senat Mahasiswa

Fakultas Ekonomika dan Bisnis.

2009

2010

Pengalaman Kerja 1. Asisten Dosen Aplikasi Spreadsheet

Fakultas Ekonomika dan Bisnis

UKSW

2. Asisten Dosen Aplikasi Spreadsheet

dan Pengantar Akuntansi Fakultas

Ekonomika dan Bisnis UKSW

2011

2012

Kepanitiaan 1. Panitia Accounting Fair “Globalisasi

Akuntansi dan Penguatan Usaha

Kecil Menengah di Indonesia”

2. Panitia Seminar Nasional “Kode Etik

Profesi Akuntan Publik”

3. Sekretaris National Seminar on

Accounting “Peran Akuntansi Dalam

Pemberantasan Korupsi”

4. Ketua National Seminar on

Accounting “ Penyusunan Laporan

Keuangan Berbasis SAK 2010”

5. Ketua National Seminar on

Accounting “ Penyusunan Laporan

Keuangan Berbasis SAK ETAP”

6. Panitia Makrab Ekonomi, “Economic

Goes To The World”.

2009

2009

2010

2011

2011

2011

Page 20: Contoh Jurnal jurnal yang terkait dengan Pengakuan …repository.uksw.edu/bitstream/123456789/2642/3/T1_232008091... · Contoh Jurnal – jurnal yang ... PRODUCTION PAYMENT SUMMARY

63

Seminar dan Pelatihan 1. Golden 2008 ( Program Pengenalan

Fakultas )

2. Talk Show Fakultas Ekonomika dan

Bisnis

3. Latihan Kepemimpinan Pra Dasar

Mahasiswa

4. Seminar Kerohanian “Keluargaku,

Penting nggak sih?”

5. Accounting Weekend Fellowship

2008 ( Pengenalan Program Studi dan

Keakraban Mahasiswa Program

Studi)

6. Kegiatan Pelestarian Budaya Melalui

“NOANCEP”

7. Kuliah Umum “Asuransi Sebagai

Pilihan Investasi”

8. Kegiatan Basic Leadership Training

“Prepare Future Leaders In Creative

and Innovative”

9. Seminar Nasional Kewirausahaan

“Great Man Have a Great Mind”

10. Sosialisasi Undang – Undang No. 21

Tahun 2011 Tentang Otoritas Jasa

Keuangan

2008

2008

2008

2009

2009

2010

2010

2010

2011

2012

Keterampilan

Penunjang

1. Konser Kursus Ke – 13 Fakultas Seni

Pertunjukan UKSW

2. Konser Kursus Fakultas Seni

Pertunjukan UKSW “Brighten Your

Day With Music”

2010

2012