Project OverviewContract Award: 1985 (Kepiting)
1988 (Ikan Pari)1989 (SA-1)
Sales: Singapore
Fabrication: Singapore
Service Base: Singapore
Host Type: FPSO
Contract Type: EPC
Project CharacteristicsNo. Trees: 2 (Kepiting)
3 (Ikan Pari)1 (SA-1)
Water Depth: 90 m (295 ft)
Tree Type: Vertical
Tree Pressure: 5,000 psi
Tree Bore Size: 3”x2”
Hydrocarbon: Oil
Project OwnershipConocoPhillips 40%
Texaco 25%
Inpex 35%
ConocoPhillips Kepiting, IkanPari & SA-1, Indonesia
Landmark: Unique Snap-On Buoy Well Intervention System
-
8/17/2019 ConocoPhillips Kepiting Ikan Pari_0408
2/2
A SIA
Regional Sales Office:
FMC Technologies
Southeast Asia Pte. Ltd.
149 Gul Circle
Singapore 629605
Phone: +65 6861 3011
Fax: +65 6862 0527
www.fmctechnologies.com
Scope of Work
4 Six (6) vertical 3”x2” 5,000 psi subsea trees
4 18-3/4” 10,000 psi subsea wellhead with clamp hub profile
4 Torus II hydraulic tree connector4 3” 5,000 psi lower master, swab and production wing valves,
fail-safe closed
4 3” 5,000 psi fail-safe closed swab valve, trimmed for
shearing wireline
4 3-1/8” riser with tapered stress joints and standing buoy
4 System integration, testing, installation assistance, service
and maintenance
Comments
The Kepiting Field was first developed in 1985 with two (2)
subsea systems. This effort was followed up with three (3) wells
on Ikan Pari and one (1) well on SA-1 in 1989. The Ikan Pari and
SA-1 trees were designed for subsea flowline layaway installation.In 1994, the three (3) systems from the Ikan Pari Field were
recovered, refurbished and deployed on the Belida Field.