REKAPITULASI RENCANA ANGGARAN BIAYA PROGRAM : PENGELOLAAN RUANG TERBUKA HIJAU (RTH) KEGIATAN : PENINGKATAN / REHAB TAMAN DAN MEDIAN JALAN KOTA SAMARINDA PEKERJAAN : PEMBANGUNAN TAMAN CERDAS/PINTAR PKK JL. S. PARMAN LOKASI : KOTA SAMARINDA NO URAIAN PEKERJAAN JUMLAH A PEKERJAAN PERSIAPAN Rp 49,176,284.67 B PEKERJAAN LAHAN 1 Jalan + Acc Rp 480,327,762.54 2 Area Monumen Pesut Rp 129,712,668.13 3 Area Monumen Tambangan Rp 77,539,057.65 4 Area Skate Park Rp 43,437,416.96 5 Area Play Ground Rp 86,108,134.60 6 Area Taman Bunga Rp 11,295,946.71 C PEKERJAAN LANDSCAPE Rp 182,647,118.50 D PEKERJAAN LAIN LAIN Rp 18,046,050.55 TOTAL Rp 1,078,290,440.31 PPN 10% Rp 107,829,044.03 JUMLAH Rp 1,186,119,484.34 DIBULATKAN Rp 1,186,119,000.00 Terbilang : " Satu Milyar Seratus Delapan Puluh Enam Juta Seratus Sembilan Belas Ribu Rupiah " Samarinda, 1 September 2013 amarinda, ................................... 201 CV. SINERGI UTAMA RIYANTO Direktur

Transcript of Cco Taman Cerdas Pkk 26-11-2013

Page 1: Cco Taman Cerdas Pkk 26-11-2013

REKAPITULASI RENCANA ANGGARAN BIAYA

PROGRAM : PENGELOLAAN RUANG TERBUKA HIJAU (RTH)KEGIATAN : PENINGKATAN / REHAB TAMAN DAN MEDIAN JALAN KOTA SAMARINDAPEKERJAAN : PEMBANGUNAN TAMAN CERDAS/PINTAR PKK JL. S. PARMANLOKASI : KOTA SAMARINDA

NO URAIAN PEKERJAAN JUMLAH

A PEKERJAAN PERSIAPAN Rp 49,176,284.67

B PEKERJAAN LAHAN

1 Jalan + Acc Rp 480,327,762.54

2 Area Monumen Pesut Rp 129,712,668.13

3 Area Monumen Tambangan Rp 77,539,057.65

4 Area Skate Park Rp 43,437,416.96

5 Area Play Ground Rp 86,108,134.60

6 Area Taman Bunga Rp 11,295,946.71

C PEKERJAAN LANDSCAPE Rp 182,647,118.50

D PEKERJAAN LAIN LAIN Rp 18,046,050.55

TOTAL Rp 1,078,290,440.31

PPN 10% Rp 107,829,044.03

JUMLAH Rp 1,186,119,484.34

DIBULATKAN Rp 1,186,119,000.00

Terbilang :" Satu Milyar Seratus Delapan Puluh Enam Juta Seratus Sembilan Belas Ribu Rupiah "

Samarinda, 1 September 2013Samarinda, ................................... 2013

CV. SINERGI UTAMA

RIYANTODirektur

Page 2: Cco Taman Cerdas Pkk 26-11-2013

RENCANA ANGGARAN BIAYAPROGRAM : PENGELOLAAN RUANG TERBUKA HIJAU (RTH)

KEGIATAN : PENINGKATAN / REHAB TAMAN DAN MEDIAN JALAN KOTA SAMARINDA

PEKERJAAN : PEMBANGUNAN TAMAN CERDAS/PINTAR PKK JL. S. PARMAN

LOKASI : KOTA SAMARINDA

NO URAIAN PEKERJAAN

A PEKERJAAN PERSIAPAN

1 Papan Nama Proyek

2 Pembersihan Lokasi

3 Pekerjaan Perapihan/pembongkaran

4 Direksi Keet

5 Gudang bahan & Los kerja

6 Fasilitas Listrik & Air Kerja sementara

7 Security/ Keamanan Proyek

9 Asbuiltdrawing/Shopdrawing/Dokumentasi

Sub total A

B PEKERJAAN LAHAN

1 Jalan + Acc

1.1 Timbunan Tanah dari luar site (pemerataan areal)

1.2 Pasir Urug t : 5cm

1.3 Paving Block

1.4 Kansteen 10x20x40cm (finis cat minyak)

1.5 Lantai Kerja cor rabat t : 10cm

1.6 Koral Sikat

1.7 Pagar Pipa Besi 2,5" + kawat seling galvanis 6mm

1.8 Rambu Lalu Lintas

1.9 Pengecatan Paving Block

1.10 Pengecatan Koral Sikat

Sub Jumlah B.1

2 Area Monumen Pesut

2.1 lantai kerja cor rabat (t:variasi)

2.2 Koral sikat

2.3 Keramik 40x40

2.4 Batu Templek

Page 3: Cco Taman Cerdas Pkk 26-11-2013

2.5 Patung Pesut

2.6 Mading white board (122x144)

2.7 Pengecatan Koral Sikat

2.8 Fhinishing Coating Gloss Batu Templek

2.9 Fhinising Coating Gloss Patung Pesut

Sub Jumlah B.2

3 Area Monumen Tambangan

3.1 lantai kerja cor rabat (t:10cm)

3.2 Rolag pas. bata

3.3 Plester + Aci t:15 camp.1pc3ps

3.4 Pengecatan Dinding Watershaled

3.5 Miniatur tambangan

3.6 Mading white board (122x144)

Sub Jumlah B.3

4 Area Skate Park

4.1 Paris Urug

4.2 Pondasi batu kosong (aanstamping)

4.3 lantai kerja cor rabat (t:10cm)

4.4 Rolag pas. bata

4.5 Plester + Aci t:15 camp.1pc3ps

4.6 Pengecatan Dinding Watershaled

4.7 Pemasangan Besi Siku 5cm t:3mm

4.8 Pemasangan Pipa Besi 2" Medium A

4.9 Plester+Aci Lantai Rabat

Sub Jumlah B.4

5 Area Play Ground

5.1 lantai kerja cor rabat (t:10cm)

5.2 Peluncuran (Perosotan)

5.3 Jungkat-Jungkit

5.4 Ayunan

5.5 Besi Panjat Lingkaran

5.6 Halang Rintang

5.7 Plester+Aci Lantai Rabat

5.8 Pengecatan lantai Rabat (dekoratif)

Sub Jumlah B.5

6 Area Taman Bunga

6.1 Rolag pas. bata

Page 4: Cco Taman Cerdas Pkk 26-11-2013

6.2 Papan Nama (TAMAN CERDAS) stainless steel

6.3 Pipa besi stainless steel 2,5" penyangga papan nama

Sub Jumlah B.6

Sub Total B

C LANSEKAP

1 Timbunan Tanah Top soil

2 Pemberian Pupuk Kandang

3 Pemberian Pupuk NPK

4 Penanaman Rumput

5 Penanaman Kucai

6 Penanaman Asoka Lombok

7 Penanaman Bakung

8 Penanaman Sugata

9 Penanaman Pandan Belgia

10 Penanaman Pucuk Merah

Sub Total C

D PEKERJAAN LAIN-LAIN

1 Perbaikan Parit Existing

2 Perbaikan Jembatan

3 Pembersihan akhir lokasi

4 Pelester+Acian Parit Existing

5 Pipa Resapan PVC 3"

6 Cor Rabat Beton Tangga Depan

7 Pelester+Acian Tangga Depan

Sub Total D

Page 5: Cco Taman Cerdas Pkk 26-11-2013

RENCANA ANGGARAN BIAYA: PENGELOLAAN RUANG TERBUKA HIJAU (RTH)

: PENINGKATAN / REHAB TAMAN DAN MEDIAN JALAN KOTA SAMARINDA

: PEMBANGUNAN TAMAN CERDAS/PINTAR PKK JL. S. PARMAN

HARGA KONTRAK AWAL

SATUAN VOLUME SAT.

JUMLAH

(RP) HARGA (RP)

Rp 606,368.75 0.960 Rp 582,114.00

Rp 2,665.00 4,534.683 Rp 12,084,929.93

Rp 7,024.00 2,267.341 Rp 15,925,806.34

Rp 578,234.10 9.000 Rp 5,204,106.90

Rp 525,288.50 15.000 Rp 7,879,327.50

Rp 2,000,000.00 1.000 Ls Rp 2,000,000.00

Rp 4,000,000.00 1.000 Ls Rp 4,000,000.00

Rp 1,500,000.00 1.000 Ls Rp 1,500,000.00

Rp 49,176,284.67

Rp 114,506.00 300.000 Rp 34,351,800.00

Rp 136,336.73 41.470 Rp 5,653,884.39

Rp 238,448.37 829.400 Rp 197,769,080.11

Rp 116,882.06 452.990 Rp 52,946,406.22

Rp 679,605.40 31.851 Rp 21,646,111.60

Rp 252,377.07 318.510 Rp 80,384,621.72

Rp 292,676.73 264.800 m' Rp 77,500,797.21

Rp 503,753.07 20.000 Unit Rp 10,075,061.31

Rp 26,729.00

Rp 26,729.00

Rp 480,327,762.54

Rp 679,605.40 38.449 Rp 26,130,351.91

Rp 252,377.07 159.590 Rp 40,276,857.18

Rp 155,138.00 46.874 Rp 7,271,938.61

Rp 331,948.37 12.566 Rp 4,171,263.25

m2

m2

m2

m2

m2

m3

m3

m2

m1

m3

m2

m2

m2

m3

m2

m2

m2

Page 6: Cco Taman Cerdas Pkk 26-11-2013

Rp 16,817,862.40 3.000 bh Rp 50,453,587.19

Rp 1,408,670.00 1.000 bh Rp 1,408,670.00

Rp 26,729.00

Rp 85,000.00

Rp 1,500,000.00 ls

Rp 129,712,668.13

Rp 679,605.40 3.759 Rp 2,554,296.90

Rp 218,526.00 105.614 Rp 23,079,372.19

Rp 43,847.00 497.625 Rp 21,819,380.91

Rp 32,163.60 497.625 Rp 16,005,424.32

Rp 12,671,913.34 1.000 ls Rp 12,671,913.34

Rp 1,408,670.00 1.000 ls Rp 1,408,670.00

Rp 77,539,057.65

Rp 136,336.73 5.239 Rp 714,315.87

Rp 387,700.00 15.718 Rp 6,093,887.99

Rp 679,605.40 18.915 Rp 12,854,872.06

Rp 218,526.00 52.948 Rp 11,570,602.06

Rp 43,847.00 160.553 Rp 7,039,772.65

Rp 32,163.60 160.553 Rp 5,163,966.33

Rp 41,000.00 m'

Rp 150,000.00 m'

Rp 43,847.00

Rp 43,437,416.96

Rp 679,605.40 32.329 Rp 21,970,827.06

Rp 8,592,309.50 1.000 bh Rp 8,592,309.50

Rp 3,989,665.00 1.000 bh Rp 3,989,665.00

Rp 4,984,550.00 1.000 bh Rp 4,984,550.00

Rp 31,768,240.00 1.000 bh Rp 31,768,240.00

Rp 14,802,543.04 1.000 bh Rp 14,802,543.04

Rp 43,847.00

Rp 55,000.00

Rp 86,108,134.60

Rp 218,526.00 0.742 Rp 162,226.71

m2

m2

m3

m3

m2

m2

m3

m3

m3

m3

m2

m2

m2

m3

m2

m2

m3

Page 7: Cco Taman Cerdas Pkk 26-11-2013

Rp 675,000.00 11.000 bh Rp 7,425,000.00

Rp 450,000.00 8.242 Rp 3,708,720.00

Rp 11,295,946.71

Rp 828,420,986.58

Rp 153,006.00 200.000 Rp 30,601,200.00

Rp 13,535.50 2,000.000 Rp 27,071,000.00

Rp 7,710.50 2,000.000 Rp 15,421,000.00

Rp 34,361.36 2,000.000 Rp 68,722,720.00

Rp 6,586.36 927.000 polybag Rp 6,105,555.72

Rp 9,086.36 925.000 polybag Rp 8,404,883.00

Rp 7,631.90 925.000 polybag Rp 7,059,507.50

Rp 9,086.36 925.000 polybag Rp 8,404,883.00

Rp 9,086.36 925.000 polybag Rp 8,404,883.00

Rp 106,586.36 23.000 polybag Rp 2,451,486.28

Rp 182,647,118.50

Rp 333,795.50 47.000 m' Rp 15,688,388.50

Rp 1,357,662.05 1.000 ls Rp 1,357,662.05

Rp 1,000,000.00 1.000 ls Rp 1,000,000.00

Rp 43,847.00

Rp 45,000.00 m'

Rp 679,605.40

Rp 43,847.00

Rp 18,046,050.55

Total Kontrak Tanpa Pajak Rp 1,078,290,440.31 Pajak Rp 107,829,044.03 jumlah Rp 1,186,119,484.34

m2

m3

m2

m2

m2

m2

m3

m2

Page 8: Cco Taman Cerdas Pkk 26-11-2013

RENCANA ANGGARAN BIAYA

PEKERJAAN TAMBAH PEKERJAAN KURANG

VOLUMEJUMLAH

VOLUME JUMLAH

HARGA (RP) HARGA (RP)

829.400 Rp 22,169,032.600

318.510 Rp 8,513,453.790

Page 9: Cco Taman Cerdas Pkk 26-11-2013

159.590 Rp 4,265,681.110

12.566 Rp 1,068,110.000

1.000 Rp 1,500,000.000

26.618 Rp 5,816,681.36

90.354 Rp 3,961,751.84

90.354 Rp 2,906,109.91

47.494 Rp 10,378,653.52

141.751 Rp 6,215,354.34

141.751 Rp 4,559,221.18

38.873 Rp 1,593,809.400

37.070 Rp 5,560,500.000

189.152 Rp 8,293,747.744

323.288 Rp 14,175,208.936

323.288 Rp 17,780,840.000

Page 10: Cco Taman Cerdas Pkk 26-11-2013

248.216 Rp 10,883,514.675

28.000 Rp 1,260,000.000

0.360 Rp 244,657.944

2.360 Rp 103,478.920

Rp 45,113,570.64

Rp 49,624,927.71

Page 11: Cco Taman Cerdas Pkk 26-11-2013

RENCANA ANGGARAN BIAYA

CONTRACT CHANGE ORDER (CCO)

KETERANGAN VOLUME

JUMLAH

HARGA (RP)

0.960 Rp 582,114.00 tetap

4,534.683 Rp 12,084,929.93 tetap

2,267.341 Rp 15,925,806.34 tetap

9.000 Rp 5,204,106.90 tetap

15.000 Rp 7,879,327.50 tetap

1.000 Rp 2,000,000.00 tetap

1.000 Rp 4,000,000.00 tetap

1.000 Rp 1,500,000.00 tetap

Rp 49,176,284.67

300.000 Rp 34,351,800.00 tetap

41.470 Rp 5,653,884.39 tetap

829.400 Rp 197,769,080.11 tetap

452.990 Rp 52,946,406.22 tetap

31.851 Rp 21,646,111.60 tetap

318.510 Rp 80,384,621.72 tetap

di hilangkan

20.000 Rp 10,075,061.31 tetap

829.400 Rp 22,169,032.60 tambah

318.510 Rp 8,513,453.79 tambah

Rp 433,509,451.73

38.449 Rp 26,130,351.91 tetap

159.590 Rp 40,276,857.18 tetap

46.874 Rp 7,271,938.61 tetap

12.566 Rp 4,171,263.25 tetap

Page 12: Cco Taman Cerdas Pkk 26-11-2013

3.000 Rp 50,453,587.19 tetap

1.000 Rp 1,408,670.00 tetap

159.590 4,265,681.110 tambah

12.566 1,068,110.000 tambah

1.000 1,500,000.000 tambah

Rp 136,546,459.24

3.759 Rp 2,554,296.90 tetap

26.618 Rp 5,816,681.36 kurang

90.354 Rp 3,961,751.84 kurang

90.354 Rp 2,906,109.91 kurang

di hilangkan

di hilangkan

Rp 15,238,840.01

5.239 Rp 714,315.87 tetap

15.718 Rp 6,093,887.99 tetap

18.915 Rp 12,854,872.06 tetap

47.494 Rp 10,378,653.52 kurang

141.751 Rp 6,215,354.34 kurang

141.751 Rp 4,559,221.18 kurang

38.873 Rp 1,593,809.40 tambah

37.070 Rp 5,560,500.00 tambah

189.152 Rp 8,293,747.74 tambah

Rp 56,264,362.10

32.329 Rp 21,970,827.06 tetap

1.000 Rp 8,592,309.50 tetap

1.000 Rp 3,989,665.00 tetap

1.000 Rp 4,984,550.00 tetap

1.000 Rp 31,768,240.00 tetap

1.000 Rp 14,802,543.04 tetap

323.288 14,175,208.936 tambah

323.288 17,780,840.000 tambah

Rp 118,064,183.53

0.742 Rp 162,226.71 tetap

Page 13: Cco Taman Cerdas Pkk 26-11-2013

11.000 Rp 7,425,000.00 tetap

8.242 Rp 3,708,720.00 tetap

Rp 11,295,946.71

200.000 Rp 30,601,200.00 tetap

2,000.000 Rp 27,071,000.00 tetap

2,000.000 Rp 15,421,000.00 tetap

2,000.000 Rp 68,722,720.00 tetap

927.000 Rp 6,105,555.72 tetap

925.000 Rp 8,404,883.00 tetap

925.000 Rp 7,059,507.50 tetap

925.000 Rp 8,404,883.00 tetap

925.000 Rp 8,404,883.00 tetap

23.000 Rp 2,451,486.28 tetap

Rp 182,647,118.50

47.000 Rp 15,688,388.50 tetap

1.000 Rp 1,357,662.05 tetap

1.000 Rp 1,000,000.00 tetap

248.216 Rp 10,883,514.67 tambah

28.000 Rp 1,260,000.00 tambah

0.360 Rp 244,657.94 tambah

2.360 Rp 103,478.92 tambah

Rp 30,434,223.17

Rp 1,033,176,869.67 Rp 103,317,686.97 Rp 1,136,494,556.63

Page 14: Cco Taman Cerdas Pkk 26-11-2013

BOBOT PROGRES PERSENTASE

0.054 0.054 100%

1.121 1.121 100%

1.477 1.477 100%

0.483 0.483 100%

0.731 0.731 100%

0.185 0.185 100%

0.371 0.185 50%

0.139 0.070 50%

3.186 2.230 70%

0.524 0.367 70%

18.341 9.170 50%

4.910 2.455 50%

2.007 1.004 50%

7.455 2.982 40%

0.934 0.000

2.056 0.000

0.790 0.158 20%

2.423 0.000

3.735 0.000

0.674 0.000

0.387 0.000

Page 15: Cco Taman Cerdas Pkk 26-11-2013

4.679 0.000

0.131 0.000

0.396 0.000

0.099 0.000

0.139 0.000

0.237 0.118 50%

2.140 2.140 100%

2.024 2.024 100%

1.484 0.000

0.066 0.066 100%

0.565 0.565 100%

1.192 0.596 50%

1.073 1.073 100%

0.653 0.653 100%

0.479 0.000

0.148 0.000

0.516 0.000

0.769 0.000

2.038 2.038 100%

0.797 0.000

0.370 0.000

0.462 0.000

2.946 0.000

1.373 0.000

1.315 0.000

1.649 0.000

0.015 0.000

Page 16: Cco Taman Cerdas Pkk 26-11-2013

0.689 0.000

0.344 0.000

2.838 0.000

2.511 0.000

1.430 0.000

6.373 0.000

0.566 0.000

0.779 0.000

0.655 0.000

0.779 0.000

0.779 0.000

0.227 0.000

1.455 0.727 50%

0.126 0.000

0.093 0.000

1.009 0.000

0.117 0.000

0.023 0.000

0.010 0.000

100.541 32.673

Page 17: Cco Taman Cerdas Pkk 26-11-2013

1,078,290,440

1,078,290,440

Page 18: Cco Taman Cerdas Pkk 26-11-2013

1,078,290,440

Page 19: Cco Taman Cerdas Pkk 26-11-2013

1,078,290,440

Page 20: Cco Taman Cerdas Pkk 26-11-2013

RENCANA ANGGARAN BIAYAPROGRAM : PENGELOLAAN RUANG TERBUKA HIJAU (RTH)KEGIATAN : PENINGKATAN / REHAB TAMAN DAN MEDIAN JALAN KOTA SAMARINDAPEKERJAAN : PEMBANGUNAN TAMAN CERDAS/PINTAR PKK JL. S. PARMANLOKASI : KOTA SAMARINDA

NO URAIAN PEKERJAAN VOLUME SAT.

A PEKERJAAN PERSIAPAN1 Papan Nama Proyek 0.960 Rp 606,368.75 Rp 582,114.00

2 Pembersihan Lokasi 4,534.683 Rp 2,665.00 Rp 12,084,929.93

3 Pekerjaan Perapihan/pembongkaran 2,267.341 Rp 7,024.00 Rp 15,925,806.34

4 Direksi Keet 9.000 Rp 578,234.10 Rp 5,204,106.90

5 Gudang bahan & Los kerja 15.000 Rp 525,288.50 Rp 7,879,327.50

6 Fasilitas Listrik & Air Kerja sementara 1.000 Ls Rp 2,000,000.00 Rp 2,000,000.00

7 Security/ Keamanan Proyek 1.000 Ls Rp 4,000,000.00 Rp 4,000,000.00

9 Asbuiltdrawing/Shopdrawing/Dokumentasi 1.000 Ls Rp 1,500,000.00 Rp 1,500,000.00

Sub total A Rp 49,176,284.67

B PEKERJAAN LAHAN1 Jalan + Acc

1.1 Timbunan Tanah dari luar site (pemerataan areal 300.000 Rp 114,506.00 Rp 34,351,800.00

1.2 Pasir Urug t : 5cm 41.470 Rp 136,336.73 Rp 5,653,884.39

1.3 Paving Block 829.400 Rp 238,448.37 Rp 197,769,080.11

1.4 Kansteen 10x20x40cm (finis cat minyak) 452.990 Rp 116,882.06 Rp 52,946,406.22

1.5 Lantai Kerja cor rabat t : 10cm 31.851 Rp 679,605.40 Rp 21,646,111.60

1.6 Koral Sikat 318.510 Rp 252,377.07 Rp 80,384,621.72

1.7 Pagar Pipa Besi 2,5" + kawat seling galvanis 6 264.800 Rp 292,676.73 Rp 77,500,797.21

1.8 Rambu Lalu Lintas 20.000 Unit Rp 503,753.07 Rp 10,075,061.31

Sub Jumlah B.1 Rp 480,327,762.54

2 Area Monumen Pesut2.1 lantai kerja cor rabat (t:variasi) 38.449 Rp 679,605.40 Rp 26,130,351.91

2.2 Koral sikat 159.590 Rp 252,377.07 Rp 40,276,857.18

2.3 Keramik 40x40 46.874 Rp 155,138.00 Rp 7,271,938.61

2.4 Batu Templek 12.566 Rp 331,948.37 Rp 4,171,263.25

2.5 Patung Pesut 3.000 bh Rp16,817,862.40 Rp 50,453,587.19

2.6 Mading white board (122x144) 1.000 bh Rp 1,408,670.00 Rp 1,408,670.00

Sub Jumlah B.2 Rp 129,712,668.13

3 Area Monumen Tambangan3.1 lantai kerja cor rabat (t:10cm) 3.759 Rp 679,605.40 Rp 2,554,296.90

3.2 Rolag pas. bata 105.614 Rp 218,526.00 Rp 23,079,372.19

3.3 Plester + Aci t:15 camp.1pc3ps 497.625 Rp 43,847.00 Rp 21,819,380.91

3.4 Pengecatan Dinding Watershaled 497.625 Rp 32,163.60 Rp 16,005,424.32

3.5 Miniatur tambangan 1.000 bh Rp12,671,913.34 Rp 12,671,913.34

3.6 Mading white board (122x144) 1.000 bh Rp 1,408,670.00 Rp 1,408,670.00

Sub Jumlah B.3 Rp 77,539,057.65

4 Area Skate Park4.1 Pasir Urug 5.239 Rp 136,336.73 Rp 714,315.87

4.2 Pondasi batu kosong (aanstamping) 15.718 Rp 387,700.00 Rp 6,093,887.99

4.3 lantai kerja cor rabat (t:10cm) 18.915 Rp 679,605.40 Rp 12,854,872.06

4.4 Rolag pas. bata 52.948 Rp 218,526.00 Rp 11,570,602.06

4.5 Plester + Aci t:15 camp.1pc3ps 160.553 Rp 43,847.00 Rp 7,039,772.65

4.6 Pengecatan Dinding Watershaled 160.553 Rp 32,163.60 Rp 5,163,966.33

Sub Jumlah B.4 Rp 43,437,416.96

5 Area Play Ground5.1 lantai kerja cor rabat (t:10cm) 32.329 Rp 679,605.40 Rp 21,970,827.06

5.2 Peluncuran (Perosotan) 1.000 bh Rp 8,592,309.50 Rp 8,592,309.50

5.3 Jungkat-Jungkit 1.000 bh Rp 3,989,665.00 Rp 3,989,665.00

5.4 Ayunan 1.000 bh Rp 4,984,550.00 Rp 4,984,550.00

5.5 Besi Panjat Lingkaran 1.000 bh Rp31,768,240.00 Rp 31,768,240.00

5.6 Halang Rintang 1.000 bh Rp14,802,543.04 Rp 14,802,543.04

Sub Jumlah B.5 Rp 86,108,134.60

HARGA SAT.(Rp.)

JUMLAH(Rp.)

m2

m2

m2

m2

m2

m3

m3

m2

m1

m3

m2

m1

m3

m2

m2

m2

m3

m3

m2

m2

m3

m3

m3

m3

m2

m2

m3

Page 21: Cco Taman Cerdas Pkk 26-11-2013

RENCANA ANGGARAN BIAYAPROGRAM : PENGELOLAAN RUANG TERBUKA HIJAU (RTH)KEGIATAN : PENINGKATAN / REHAB TAMAN DAN MEDIAN JALAN KOTA SAMARINDAPEKERJAAN : PEMBANGUNAN TAMAN CERDAS/PINTAR PKK JL. S. PARMANLOKASI : KOTA SAMARINDA

NO URAIAN PEKERJAAN VOLUME SAT.HARGA SAT.

(Rp.)JUMLAH

(Rp.)6 Area Taman Bunga

6.1 Rolag pas. bata 0.742 Rp 218,526.00 Rp 162,226.71

6.2 Papan Nama (TAMAN CERDAS) stainless steel 11.000 bh Rp 675,000.00 Rp 7,425,000.00

6.3 Pipa besi stainless steel 2,5" penyangga papan 8.242 Rp 450,000.00 Rp 3,708,720.00

Sub Jumlah B.6 Rp 11,295,946.71

Sub Total B Rp 828,420,986.58

C LANSEKAP 1 Timbunan Tanah Top soil 200.000 Rp 153,006.00 Rp 30,601,200.00

2 Pemberian Pupuk Kandang 2,000.000 Rp 13,535.50 Rp 27,071,000.00

3 Pemberian Pupuk NPK 2,000.000 Rp 7,710.50 Rp 15,421,000.00

4 Penanaman Rumput 2,000.000 Rp 34,361.36 Rp 68,722,720.00

5 Penanaman Kucai 927.000 polybag Rp 6,586.36 Rp 6,105,555.72

6 Penanaman Asoka Lombok 925.000 polybag Rp 9,086.36 Rp 8,404,883.00

7 Penanaman Bakung 925.000 polybag Rp 7,631.90 Rp 7,059,507.50

8 Penanaman Sugata 925.000 polybag Rp 9,086.36 Rp 8,404,883.00

9 Penanaman Pandan Belgia 925.000 polybag Rp 9,086.36 Rp 8,404,883.00

10 Penanaman Pucuk Merah 23.000 polybag Rp 106,586.36 Rp 2,451,486.28

Sub Total C Rp 182,647,118.50

D PEKERJAAN LAIN-LAIN1 Perbaikan Parit Existing 47.000 m' Rp 333,795.50 Rp 15,688,388.50

2 Perbaikan Jembatan 1.000 ls Rp 1,357,662.05 Rp 1,357,662.05

3 Pembersihan akhir lokasi 1.000 ls Rp 1,000,000.00 Rp 1,000,000.00

Sub Total D Rp 18,046,050.55

m3

m2

m3

m2

m2

m2

Page 22: Cco Taman Cerdas Pkk 26-11-2013

#Analisa Harga Satuan Page 22

ANALISA HARGA SATUAN PEKERJAAN : PEMBANGUNAN TAMAN CERDAS/PINTAR PKK JL. S. PARMAN LOKASI : KOTA SAMARINDA

VOL. Satuan Uraian PekerjaanHarga

(1) (2) (3) (4) PEKERJAAN PERSIAPAN

1M2 Pek. Pengukuran Kembali (Site) 0.0050 org Pekerja Rp 69,000.00 Rp 345.00 Rp 345.00 0.0100 org Tukang Rp 83,000.00 Rp 830.00 Rp 830.00 1.0000 ls Peralatan Rp 1,000.00 Rp 1,000.00 Rp 1,000.00

Jumlah Rp 2,175.00 1M2 Los Kerja/Gudang

0.1000 m3 Kayu Borneo Super ulin Rp 3,850,000.00 Rp 385,000.00 Rp 385,000.00 0.2150 kg Paku 5 - 7 Rp 13,000.00 Rp 2,795.00 Rp 2,795.00 1.1000 lbr Seng Glb BJLS 20 Rp 38,500.00 Rp 42,350.00 Rp 42,350.00 0.5000 lbr Triplek 3 mm Rp 42,000.00 Rp 21,000.00 Rp 21,000.00 0.1000 kg PC (50 kg) Rp 1,400.00 Rp 140.00 Rp 140.00 0.2500 m3 Pasir Pasang Rp 105,000.00 Rp 26,250.00 Rp 26,250.00 1.0000 ls Peralatan Rp 9,550.70 Rp 9,550.70 Rp 9,550.70 1.0000 ls Ongkos Pasang Rp 38,202.80 Rp 38,202.80 Rp 38,202.80

Jumlah Rp 525,288.50 1M2 Kantor Direksi

0.1000 m3 Kayu Borneo Super ulin Rp 3,850,000.00 Rp 385,000.00 Rp 385,000.00 0.2500 kg Paku 5 - 7 Rp 13,000.00 Rp 3,250.00 Rp 3,250.00 1.1000 lbr Seng Glb BJLS 30 Rp 38,500.00 Rp 42,350.00 Rp 42,350.00 0.5000 lbr Triplek 3 mm Rp 42,000.00 Rp 21,000.00 Rp 21,000.00 0.1000 kg PC (50 kg) Rp 1,400.00 Rp 140.00 Rp 140.00 0.2500 m3 Pasir Pasang Rp 105,000.00 Rp 26,250.00 Rp 26,250.00 70.0000 bh Bata Merah Rp 750.00 Rp 52,500.00 Rp 52,500.00 1.0000 ls Peralatan Rp 10,609.80 Rp 10,609.80 Rp 10,609.80 1.0000 ls Ongkos Pasang Rp 37,134.30 Rp 37,134.30 Rp 37,134.30

Jumlah Rp 578,234.10 1M2 Papan Nama Proyek

0.1300 m3 Kayu Borneo Super ulin Rp 3,850,000.00 Rp 500,500.00 Rp 500,500.00 0.2500 kg Paku 5 - 7 Rp 13,000.00 Rp 3,250.00 Rp 3,250.00 1.0000 ls Cat Minyak Rp 45,000.00 Rp 45,000.00 Rp 45,000.00 1.0000 ls Penulisan Rp 13,718.75 Rp 13,718.75 Rp 13,718.75 1.0000 ls Ongkos Pasang Rp 43,900.00 Rp 43,900.00 Rp 43,900.00

Jumlah Rp 606,368.75 PEKERJAAN PERSIAPAN PERMUKAAN LAHAN

1M2 Pekerjaan Pembersihan Lokasi 0.0250 hr Pekerja Rp 69,000.00 Rp 1,725.00 Rp 1,725.00 0.0040 hr Mandor Rp 110,000.00 Rp 440.00 Rp 440.00 1.0000 Ls Alat Bantu Rp 500.00 Rp 500.00 Rp 500.00

Jumlah Rp 2,665.00 1M2 Pekerjaan Perapihan & Pemadatan

0.0560 hrn Pekerja Rp 69,000.00 Rp 3,864.00 Rp 3,864.00 0.0060 hrn Mandor Rp 110,000.00 Rp 660.00 Rp 660.00 1.0000 Ls Alat Bantu Rp 2,500.00 Rp 2,500.00 Rp 2,500.00

Jumlah Rp 7,024.00 PEKERJAAN TANAH

1M3 Timbunan Tanah Pilihan dari Luar site1.10000 m3 Material Tanah Pilihan Rp 75,000.00 Rp 82,500.00 Rp 82,500.00 0.25000 Oh Pekerja Rp 69,000.00 Rp 17,250.00 Rp 17,250.00 0.14300 Oh Kepala Tukang Rp 92,000.00 Rp 13,156.00 Rp 13,156.00 0.01000 Oh Mandor Rp 110,000.00 Rp 1,100.00 Rp 1,100.00 1.00000 LS Alat Bantu Rp 500.00 Rp 500.00 Rp 500.00

Jumlah Rp 114,506.00 1M3 Timbunan Tanah Top Soil / Humus

1.10000 m3 Material Tanah Humus Rp 110,000.00 Rp 121,000.00 Rp 121,000.00 0.25000 Oh Pekerja Rp 69,000.00 Rp 17,250.00 Rp 17,250.00 0.14300 Oh Kepala Tukang Rp 92,000.00 Rp 13,156.00 Rp 13,156.00 0.01000 Oh Mandor Rp 110,000.00 Rp 1,100.00 Rp 1,100.00 1.00000 LS Alat Bantu Rp 500.00 Rp 500.00 Rp 500.00

Jumlah Rp 153,006.00

Harga Satuan(Rp.)

Bahan(Rp.)

Upah(Rp.)

JUMLAH(Rp.)

(5) = (1) X (4) (6) = (1) X (4) (7) = (5) + (6)

Page 23: Cco Taman Cerdas Pkk 26-11-2013

#Analisa Harga Satuan Page 23

ANALISA HARGA SATUAN PEKERJAAN : PEMBANGUNAN TAMAN CERDAS/PINTAR PKK JL. S. PARMAN LOKASI : KOTA SAMARINDA

VOL. Satuan Uraian PekerjaanHarga

Harga Satuan(Rp.)

Bahan(Rp.)

Upah(Rp.)

JUMLAH(Rp.)

1 M3 Urugan Pasir Dipadatkan 1.1000 m3 Pasir pasang Rp 105,000.00 Rp 115,500.00 Rp 115,500.00 0.2857 hrn Pekerja Rp 69,000.00 Rp 19,714.29 Rp 19,714.29 0.0102 hrn Mandor Rp 110,000.00 Rp 1,122.45 Rp 1,122.45

Jumlah Rp 136,336.73 1 M3 Galian Tanah Biasa

0.7500 hrn Pekerja Rp 69,000.00 Rp 51,750.00 Rp 51,750.00 0.0250 hrn Mandor Rp 110,000.00 Rp 2,750.00 Rp 2,750.00

Jumlah Rp 54,500.00 1 M3 Urugan Kembali Galian Tanah Biasa

0.2500 hrn Pekerja Rp 69,000.00 Rp 17,250.00 Rp 17,250.00 0.0083 hrn Mandor Rp 110,000.00 Rp 916.67 Rp 916.67

Jumlah Rp 18,166.67 1 M2 Pupuk Kandang

5.0000 kg Pupuk Kandang Rp 2,500.00 Rp 12,500.00 Rp 12,500.00 0.0035 hari Pekerja Rp 69,000.00 Rp 241.50 Rp 241.50 0.0020 hari Kepala tukang Rp 92,000.00 Rp 184.00 Rp 184.00 0.0010 hari Mandor Rp 110,000.00 Rp 110.00 Rp 110.00 1.0000 Ls Alat bantu Rp 500.00 Rp 500.00 Rp 500.00

Jumlah Rp 13,535.50 1 M2 Pupuk NPK

0.4000 kg Pupuk NPK (3x selama 3bln) Rp 17,000.00 Rp 6,800.00 Rp 6,800.00 0.0035 hari Pekerja Rp 69,000.00 Rp 241.50 Rp 241.50 0.0020 hari Kepala tukang Rp 92,000.00 Rp 184.00 Rp 184.00 0.0010 hari Mandor Rp 110,000.00 Rp 110.00 Rp 110.00 0.7500 Ls Alat bantu Rp 500.00 Rp 375.00 Rp 375.00

Jumlah Rp 7,710.50

PEKERJAAN PASANGAN

1M3 Pas. Batu Kosong (aanstamping) 1.1000 m3 Batu Gunung Rp 300,000.00 Rp 330,000.00 Rp 330,000.00 0.4000 hari Pekerja Rp 69,000.00 Rp 27,600.00 Rp 27,600.00 0.2000 hari Tukang Batu Rp 83,000.00 Rp 16,600.00 Rp 16,600.00 0.1000 hari Kepala tukang batu Rp 92,000.00 Rp 9,200.00 Rp 9,200.00 0.0300 hari Mandor Rp 110,000.00 Rp 3,300.00 Rp 3,300.00 1.0000 Ls Alat bantu Rp 1,000.00 Rp 1,000.00 Rp 1,000.00

Jumlah Rp 387,700.00 1 M3 Pas. 1 Bata 1PC : 3PS (Rolaag Bata)

140.0000 bh Batu Bata Rp 750.00 Rp 105,000.00 Rp 105,000.00 0.8400 kg PC @ 50 kg Rp 1,400.00 Rp 1,176.00 Rp 1,176.00 0.1080 m3 Pasir Pasang Rp 105,000.00 Rp 11,340.00 Rp 11,340.00 0.8580 org Pekerja Rp 69,000.00 Rp 59,202.00 Rp 59,202.00 0.4280 org Tukang Batu Rp 83,000.00 Rp 35,524.00 Rp 35,524.00 0.0420 org Kepala tukang batu Rp 92,000.00 Rp 3,864.00 Rp 3,864.00 0.0220 org Mandor Rp 110,000.00 Rp 2,420.00 Rp 2,420.00

Jumlah Rp 218,526.00 1 M' Kanstin jepit taman (100 x 200 x 400) finis cat

5.7750 kg Semen @ 50 kg Rp 1,400.00 Rp 8,085.00 Rp 8,085.00 0.0200 m3 Pasir Rp 105,000.00 Rp 2,100.00 Rp 2,100.00 2.5641 m' Kanstin 10 x 20 x 40 Rp 25,000.00 Rp 64,102.56 Rp 64,102.56 0.0900 hrn Pekerja Rp 69,000.00 Rp 6,210.00 Rp 6,210.00 0.1400 hrn Tukang Batu Rp 83,000.00 Rp 11,620.00 Rp 11,620.00 0.1000 hrn Kepala Tukang Batu Rp 92,000.00 Rp 9,200.00 Rp 9,200.00 0.0200 hrn Mandor Rp 110,000.00 Rp 2,200.00 Rp 2,200.00 0.5000 m2 pengecatan cat minyak Rp 26,729.00 Rp 13,364.50 Rp 13,364.50

Jumlah Rp 116,882.06

Page 24: Cco Taman Cerdas Pkk 26-11-2013

#Analisa Harga Satuan Page 24

ANALISA HARGA SATUAN PEKERJAAN : PEMBANGUNAN TAMAN CERDAS/PINTAR PKK JL. S. PARMAN LOKASI : KOTA SAMARINDA

VOL. Satuan Uraian PekerjaanHarga

Harga Satuan(Rp.)

Bahan(Rp.)

Upah(Rp.)

JUMLAH(Rp.)

PEKERJAAN PLESTERAN

1 M2 Plesteran + acian t=15 mm campuran 1PC : 3Ps

0.1600 kg PC @ 50 kg Rp 1,400.00 Rp 224.00 Rp 224.00 0.0190 m3 Pasir Rp 105,000.00 Rp 1,995.00 Rp 1,995.00 0.2860 hrn Pekerja Rp 69,000.00 Rp 19,734.00 Rp 19,734.00 0.2140 hrn Tukang Batu Rp 83,000.00 Rp 17,762.00 Rp 17,762.00 0.0210 hrn Kepala tukang batu Rp 92,000.00 Rp 1,932.00 Rp 1,932.00 0.0200 hrn Mandor Rp 110,000.00 Rp 2,200.00 Rp 2,200.00

Jumlah Rp 43,847.00

PEKERJAAN PENYELESAIAN LANTAI

1 M2 Batu Sikat (Pearl Stone) 6.5332 kg PC @ 50 kg Rp 1,400.00 Rp 9,146.53 Rp 9,146.53 0.1000 m3 Rabat beton Rp 679,605.40 Rp 67,960.54 Rp 67,960.54 0.5500 krg Kerikil jagung @ 20 kg Rp 210,000.00 Rp 115,500.00 Rp 115,500.00 0.1200 hari Pekerja Rp 69,000.00 Rp 8,280.00 Rp 8,280.00 0.2100 hari Tukang Batu Rp 83,000.00 Rp 17,430.00 Rp 17,430.00 0.3300 hari Kep. Tukang Batu Rp 92,000.00 Rp 30,360.00 Rp 30,360.00 0.0200 hari Mandor Rp 110,000.00 Rp 2,200.00 Rp 2,200.00 1.0000 ls Alat bantu Rp 1,500.00 Rp 1,500.00 Rp 1,500.00

Jumlah Rp 252,377.07

1 M2 Paving Block k200 1.1000 m2 Paving Block k200 Rp 165,000.00 Rp 181,500.00 Rp 181,500.00 0.0605 m3 Pasir Padat t = 10 cm Rp 136,336.73 Rp 8,248.37 Rp 8,248.37 0.3000 hrn Pekerja Rp 69,000.00 Rp 20,700.00 Rp 20,700.00 0.2000 hrn Tukang batu Rp 83,000.00 Rp 16,600.00 Rp 16,600.00 0.1000 hrn Kepala Tukang batu Rp 92,000.00 Rp 9,200.00 Rp 9,200.00 0.0200 hrn Mandor Rp 110,000.00 Rp 2,200.00 Rp 2,200.00

Jumlah Rp 238,448.37 1 M2 Batu Templek

1.1000 m2 Batu Templek Rp 250,000.00 Rp 275,000.00 Rp 275,000.00 0.0605 m3 Pasir Padat t = 10 cm Rp 136,336.73 Rp 8,248.37 Rp 8,248.37 0.3000 hrn Pekerja Rp 69,000.00 Rp 20,700.00 Rp 20,700.00 0.2000 hrn Tukang batu Rp 83,000.00 Rp 16,600.00 Rp 16,600.00 0.1000 hrn Kepala Tukang batu Rp 92,000.00 Rp 9,200.00 Rp 9,200.00 0.0200 hrn Mandor Rp 110,000.00 Rp 2,200.00 Rp 2,200.00

Jumlah Rp 331,948.37 1 M3 Rabat Beton/ Beton Tumbuk

4.9110 kg Semen @ 50 kg Rp 1,400.00 Rp 6,875.40 Rp 6,875.40 0.5260 m3 Pasir Beton Rp 240,000.00 Rp 126,240.00 Rp 126,240.00 0.8770 m3 Kerikil Rp 230,000.00 Rp 201,710.00 Rp 201,710.00 1.8560 hrn Pekerja Rp 69,000.00 Rp 128,064.00 Rp 128,064.00 1.3420 hrn Tukang Batu Rp 83,000.00 Rp 111,386.00 Rp 111,386.00 1.1150 hrn Kepala Tukang Batu Rp 92,000.00 Rp 102,580.00 Rp 102,580.00 0.0250 hrn Mandor Rp 110,000.00 Rp 2,750.00 Rp 2,750.00

Jumlah Rp 679,605.40 1 M3 Beton K 300 - Site Mix

8.696 zak Semen @ 50 kg Rp 70,000.00 Rp 608,720.00 Rp 608,720.00 0.49 m3 Pasir Beton Rp 240,000.00 Rp 139,650.00 Rp 139,650.00 0.81 m3 Split Pecah 2/3 Rp 230,000.00 Rp 289,575.00 Rp 289,575.00 1.50 hrn Pekerja Rp 69,000.00 Rp 103,500.00 Rp 103,500.00 0.75 hrn Tukang Batu setengah terampil Rp 83,000.00 Rp 62,250.00 Rp 62,250.00 0.45 hrn Kepala Tukang Batu Rp 92,000.00 Rp 41,400.00 Rp 41,400.00 0.02 hrn Mandor Rp 110,000.00 Rp 2,200.00 Rp 2,200.00 1.00 lot Peralatan Rp 12,500.00 Rp 12,500.00 Rp 12,500.00

Jumlah Rp 1,259,795.00

Page 25: Cco Taman Cerdas Pkk 26-11-2013

#Analisa Harga Satuan Page 25

ANALISA HARGA SATUAN PEKERJAAN : PEMBANGUNAN TAMAN CERDAS/PINTAR PKK JL. S. PARMAN LOKASI : KOTA SAMARINDA

VOL. Satuan Uraian PekerjaanHarga

Harga Satuan(Rp.)

Bahan(Rp.)

Upah(Rp.)

JUMLAH(Rp.)

1 M3 Beton K-175 - Site Mix6.80 zak Semen @ 50 kg Rp 70,000.00 Rp 476,000.00 Rp 476,000.00 0.54 m3 Pasir beton Rp 240,000.00 Rp 129,600.00 Rp 129,600.00 0.83 m3 Split Pecah 2/3 Rp 230,000.00 Rp 190,900.00 Rp 190,900.00 1.50 hrn Pekerja Rp 69,000.00 Rp 103,500.00 Rp 103,500.00 0.75 hrn Tukang Batu Rp 83,000.00 Rp 62,250.00 Rp 62,250.00 0.45 hrn Kepala Tukang Batu Rp 92,000.00 Rp 41,400.00 Rp 41,400.00 0.02 hrn Mandor Rp 110,000.00 Rp 2,200.00 Rp 2,200.00 1.00 lot Peralatan Rp 12,500.00 Rp 12,500.00 Rp 12,500.00

Jumlah Rp 1,018,350.00 1 M3 Beton K 225/ 250 - Site Mix

7.896 zak Semen @ 50 kg Rp 70,000.00 Rp 552,720.00 Rp 552,720.00 0.52 m3 Pasir Beton Rp 240,000.00 Rp 124,800.00 Rp 124,800.00 0.86 m3 Split Pecah 2/3 Rp 230,000.00 Rp 197,800.00 Rp 197,800.00 1.50 hrn Pekerja Rp 69,000.00 Rp 103,500.00 Rp 103,500.00 0.75 hrn Tukang Batu setengah terampil Rp 83,000.00 Rp 62,250.00 Rp 62,250.00 0.45 hrn Kepala Tukang Batu Rp 92,000.00 Rp 41,400.00 Rp 41,400.00 0.02 hrn Mandor Rp 110,000.00 Rp 2,200.00 Rp 2,200.00 1.00 lot Peralatan Rp 12,500.00 Rp 12,500.00 Rp 12,500.00

Jumlah Rp 1,097,170.00

PEKERJAAN PEMBESIAN 1 kg Besi Beton

1.0500 kg Besi Beton Ulir Rp 17,500.00 Rp 18,375.00 Rp 18,375.00 0.0100 kg Kawat Rp 22,000.00 Rp 220.00 Rp 220.00 0.0250 hrn Pekerja Rp 69,000.00 Rp 1,725.00 Rp 1,725.00 0.0160 hrn Tukang Besi Rp 83,000.00 Rp 1,328.00 Rp 1,328.00 0.0110 hrn Kepala Tukang Besi Rp 92,000.00 Rp 1,012.00 Rp 1,012.00 0.0050 hrn Mandor Rp 110,000.00 Rp 550.00 Rp 550.00 0.0200 lot Peralatan , Spancer Rp 7,438.00 Rp 148.76 Rp 148.76

Jumlah Rp 23,358.76 1 M2 Bekisting

0.0801 m3 Kaso Meranti 5/7 Rp 2,500,000.00 Rp 200,200.00 Rp 200,200.00 0.3819 lbr Multiplex 9 mm Rp 99,000.00 Rp 37,812.50 Rp 37,812.50 0.5000 kg Paku Rp 13,000.00 Rp 6,500.00 Rp 6,500.00 0.5000 Ltr Minyak Bekesting Rp 20,000.00 Rp 10,000.00 Rp 10,000.00 0.1429 hrn Pekerja Rp 69,000.00 Rp 9,857.14 Rp 9,857.14 0.1548 hrn Tukang Kayu Rp 83,000.00 Rp 12,845.24 Rp 12,845.24 0.1190 hrn Kepala Tukang Kayu Rp 92,000.00 Rp 10,952.38 Rp 10,952.38 0.0238 hrn Mandor Rp 110,000.00 Rp 2,619.05 Rp 2,619.05 1.0000 Ls Alat bantu Rp 1,500.00 Rp 1,500.00 Rp 1,500.00

Jumlah Rp 292,286.31 PEKERJAAN PENANAMAN

1 M2 1.0000 m2 Rumput Gajah (AXONOPUS COMPRESSU Rp 15,000.00 Rp 15,000.00 Rp 15,000.00

0.00444 hrn Pekerja Rp 69,000.00 Rp 306.36 Rp 306.36 0.00050 hrn Mandor Rp 110,000.00 Rp 55.00 Rp 55.00 1.00000 ls Alat bantu Rp 1,000.00 Rp 1,000.00 Rp 1,000.00

60.00000 hari Penyiraman Rp 150.00 Rp 9,000.00 Rp 9,000.00 9.00000 kali Penyiangan, pendangiran dan Rp 1,000.00 Rp 9,000.00 Rp 9,000.00

pemangkasan(setiap 10 hr sekali) Jumlah Rp 34,361.36 1 polybag Bayam-bayaman

1.0000 polybag Bayam-bayaman Rp 2,500.00 Rp 2,500.00 Rp 2,500.00 0.00444 hrn Pekerja Rp 69,000.00 Rp 306.36 Rp 306.36 0.00050 hrn Mandor Rp 110,000.00 Rp 55.00 Rp 55.00 1.00000 ls Alat bantu Rp 1,000.00 Rp 1,000.00 Rp 1,000.00

60.00000 hari Penyiraman Rp 3.00 Rp 180.00 Rp 180.00 9.00000 kali Penyiangan, pendangiran dan Rp 5.00 Rp 45.00 Rp 45.00

pemangkasan(setiap 10 hr sekali) Jumlah Err:522

Rumput Gajah (AXONOPUS COMPRESSUS)

Page 26: Cco Taman Cerdas Pkk 26-11-2013

#Analisa Harga Satuan Page 26

ANALISA HARGA SATUAN PEKERJAAN : PEMBANGUNAN TAMAN CERDAS/PINTAR PKK JL. S. PARMAN LOKASI : KOTA SAMARINDA

VOL. Satuan Uraian PekerjaanHarga

Harga Satuan(Rp.)

Bahan(Rp.)

Upah(Rp.)

JUMLAH(Rp.)

1 polybag Kucai1.00000 polybag kucai Rp 5,000.00 Rp 5,000.00 Rp 5,000.00 0.00444 hrn Pekerja Rp 69,000.00 Rp 306.36 Rp 306.36 0.00050 hrn Mandor Rp 110,000.00 Rp 55.00 Rp 55.00 1.00000 ls Alat bantu Rp 1,000.00 Rp 1,000.00 Rp 1,000.00

60.00000 hari Penyiraman Rp 3.00 Rp 180.00 Rp 180.00 9.00000 kali Penyiangan, pendangiran dan Rp 5.00 Rp 45.00 Rp 45.00

pemangkasan(setiap 10 hr sekali) Jumlah Rp 6,586.36 1 polybag Asoka Lombok

1.00000 polybag Asoka Lombok Rp 7,500.00 Rp 7,500.00 Rp 7,500.00 0.00444 hrn Pekerja Rp 69,000.00 Rp 306.36 Rp 306.36 0.00050 hrn Mandor Rp 110,000.00 Rp 55.00 Rp 55.00 1.00000 ls Alat bantu Rp 1,000.00 Rp 1,000.00 Rp 1,000.00

60.00000 hari Penyiraman Rp 3.00 Rp 180.00 Rp 180.00 9.00000 kali Penyiangan, pendangiran dan Rp 5.00 Rp 45.00 Rp 45.00

pemangkasan(setiap 10 hr sekali) Jumlah Rp 9,086.36 1 polybag Bakung

1.00000 polybag Bakung Rp 6,000.00 Rp 6,000.00 Rp 6,000.00 0.00510 hrn Pekerja Rp 69,000.00 Rp 351.90 Rp 351.90 0.00050 hrn Mandor Rp 110,000.00 Rp 55.00 Rp 55.00 1.00000 ls Alat bantu Rp 1,000.00 Rp 1,000.00 Rp 1,000.00

60.00000 hari Penyiraman Rp 3.00 Rp 180.00 Rp 180.00 9.00000 kali Penyiangan, pendangiran dan Rp 5.00 Rp 45.00 Rp 45.00

pemangkasan(setiap 10 hr sekali) Jumlah Rp 7,631.90 1 polybag Sugata

1.00000 polybag Sugata Rp 7,500.00 Rp 7,500.00 Rp 7,500.00 0.00444 hrn Pekerja Rp 69,000.00 Rp 306.36 Rp 306.36 0.00050 hrn Mandor Rp 110,000.00 Rp 55.00 Rp 55.00 1.00000 ls Alat bantu Rp 1,000.00 Rp 1,000.00 Rp 1,000.00

60.00000 hari Penyiraman Rp 3.00 Rp 180.00 Rp 180.00 9.00000 kali Penyiangan, pendangiran dan Rp 5.00 Rp 45.00 Rp 45.00

pemangkasan(setiap 10 hr sekali) Jumlah Rp 9,086.36 1 polybag Pandan Belgia

1.00000 polybag Pandan Belgia Rp 7,500.00 Rp 7,500.00 Rp 7,500.00 0.00444 hrn Pekerja Rp 69,000.00 Rp 306.36 Rp 306.36 0.00050 hrn Mandor Rp 110,000.00 Rp 55.00 Rp 55.00 1.00000 ls Alat bantu Rp 1,000.00 Rp 1,000.00 Rp 1,000.00

60.00000 hari Penyiraman Rp 3.00 Rp 180.00 Rp 180.00 9.00000 kali Penyiangan, pendangiran dan Rp 5.00 Rp 45.00 Rp 45.00

pemangkasan(setiap 10 hr sekali) Jumlah Rp 9,086.36 1 polybag Pucuk Merah

1.00000 polybag Pucuk Merah Rp 105,000.00 Rp 105,000.00 Rp 105,000.00 0.00444 hrn Pekerja Rp 69,000.00 Rp 306.36 Rp 306.36 0.00050 hrn Mandor Rp 110,000.00 Rp 55.00 Rp 55.00 1.00000 ls Alat bantu Rp 1,000.00 Rp 1,000.00 Rp 1,000.00

60.00000 hari Penyiraman Rp 3.00 Rp 180.00 Rp 180.00 9.00000 kali Penyiangan, pendangiran dan Rp 5.00 Rp 45.00 Rp 45.00

pemangkasan(setiap 10 hr sekali) Jumlah Rp 106,586.36 PEKERJAAN LAIN LAIN

1 Unit Pekerjaan Tempat Duduk Area Monumen Pesut 0.2160 m3 Galian tanah Rp 54,500.00 Rp 11,772.00 Rp 11,772.00 0.1080 m3 Urugan kembali dipadatkan Rp 18,166.67 Rp 1,962.00 Rp 1,962.00 2.7360 m3 Beton K-175 Rp 1,018,350.00 Rp 2,786,205.60 Rp 2,786,205.60 73.1787 kg Besi Tulangan Rp 23,358.76 Rp 1,709,364.76 Rp 1,709,364.76 1.0000 ls Alat Bantu Rp 12,500.00 Rp 12,500.00 Rp 12,500.00 17.6530 m2 Pengecatan dinding weather shield Rp 32,163.60 Rp 567,784.03 Rp 567,784.03

Jumlah Rp 4,521,804.36 1 Unit Pekerjaan Tempat Duduk Landscape

0.2160 m3 Galian tanah Rp 54,500.00 Rp 11,772.00 Rp 11,772.00 0.1080 m3 Urugan kembali dipadatkan Rp 18,166.67 Rp 1,962.00 Rp 1,962.00 1.8625 m3 Beton K-175 Rp 1,018,350.00 Rp 1,896,676.88 Rp 1,896,676.88 48.4860 kg Besi Tulangan Rp 23,358.76 Rp 1,132,572.84 Rp 1,132,572.84 1.0000 ls Alat Bantu Rp 12,500.00 Rp 12,500.00 Rp 12,500.00 11.6530 m2 Pengecatan dinding weather shield Rp 32,163.60 Rp 374,802.43 Rp 374,802.43

Jumlah Rp 3,055,483.71

Page 27: Cco Taman Cerdas Pkk 26-11-2013

#Analisa Harga Satuan Page 27

ANALISA HARGA SATUAN PEKERJAAN : PEMBANGUNAN TAMAN CERDAS/PINTAR PKK JL. S. PARMAN LOKASI : KOTA SAMARINDA

VOL. Satuan Uraian PekerjaanHarga

Harga Satuan(Rp.)

Bahan(Rp.)

Upah(Rp.)

JUMLAH(Rp.)

1 Unit Patung Pesut 6.0147 m3 Beton K-300 Rp 1,259,795.00 Rp 7,577,295.79 Rp 7,577,295.79 100.0000 kg Besi Tulangan Rp 23,358.76 Rp 2,335,876.00 Rp 2,335,876.00 18.0000 m2 Bekesting Rp 292,286.31 Rp 5,261,153.57 Rp 5,261,153.57 16.3240 m2 Plester + Aci Rp 43,847.00 Rp 715,758.43 Rp 715,758.43 16.3240 m2 Pengecatan dinding weather shield Rp 32,163.60 Rp 525,038.61 Rp 525,038.61 1.1800 hrn Pekerja Rp 69,000.00 Rp 81,420.00 Rp 81,420.00 3.1400 hrn Tukang Rp 83,000.00 Rp 260,620.00 Rp 260,620.00 0.5000 hrn Kepala Tukang Rp 92,000.00 Rp 46,000.00 Rp 46,000.00 0.0200 hrn Mandor Rp 110,000.00 Rp 2,200.00 Rp 2,200.00 1.0000 ls Alat Bantu Rp 12,500.00 Rp 12,500.00 Rp 12,500.00

Jumlah ###1 Unit Peluncuran

14.3220 m Pipa Galvanis Ø 2" medium A Rp 140,000.00 Rp 2,005,080.00 Rp 2,005,080.00 15.7000 m Pipa Galvanis Ø 1" medium A Rp 65,000.00 Rp 1,020,500.00 Rp 1,020,500.00 3.1500 m2 fiber lungsuran t:2mm Rp 1,643,330.00 Rp 5,176,489.50 Rp 5,176,489.50 1.1800 hrn Pekerja Rp 69,000.00 Rp 81,420.00 Rp 81,420.00 3.1400 hrn Tukang Rp 83,000.00 Rp 260,620.00 Rp 260,620.00 0.5000 hrn Kepala Tukang Rp 92,000.00 Rp 46,000.00 Rp 46,000.00 0.0200 hrn Mandor Rp 110,000.00 Rp 2,200.00 Rp 2,200.00 5.4940 m2 Pengecatan minyak Rp 26,729.00 Rp 146,849.82 Rp 146,849.82

Jumlah Rp 8,592,309.50 1 Unit Jungkat - Jungkit

5.8000 m Pipa Galvanis Ø 3" medium A Rp 290,000.00 Rp 1,682,000.00 Rp 1,682,000.00 4.3000 m Pipa Galvanis Ø 2" medium A Rp 140,000.00 Rp 602,000.00 Rp 602,000.00 3.2000 m Pipa Galvanis Ø 1" medium A Rp 65,000.00 Rp 208,000.00 Rp 208,000.00 4.0000 bh Bearing Rp 42,500.00 Rp 170,000.00 Rp 170,000.00 0.1685 m3 papan Ulin untuk Dudukan 2x20x400 Rp 4,050,000.00 Rp 682,425.00 Rp 682,425.00 2.1800 hrn Pekerja Rp 69,000.00 Rp 150,420.00 Rp 150,420.00 4.1400 hrn Tukang Rp 83,000.00 Rp 343,620.00 Rp 343,620.00 1.5000 hrn Kepala Tukang Rp 92,000.00 Rp 138,000.00 Rp 138,000.00 0.1200 hrn Mandor Rp 110,000.00 Rp 13,200.00 Rp 13,200.00 2.4339 m2 Pengecatan minyak Rp 112,951.08 Rp 274,911.63 Rp 274,911.63

Jumlah Rp 3,989,665.00 1 Unit Ayunan

10.9900 m Pipa Galvanis Ø 3" medium A Rp 290,000.00 Rp 3,187,100.00 Rp 3,187,100.00 8.5500 m rantai besi 5cm Rp 75,000.00 Rp 641,250.00 Rp 641,250.00 6.0000 m Bearing Rp 42,500.00 Rp 255,000.00 Rp 255,000.00 0.0632 m3 papan Ulin untuk Dudukan 2x20x400 Rp 4,050,000.00 Rp 255,960.00 Rp 255,960.00 2.1800 hrn Pekerja Rp 69,000.00 Rp 150,420.00 Rp 150,420.00 4.1400 hrn Tukang Rp 83,000.00 Rp 343,620.00 Rp 343,620.00 1.5000 hrn Kepala Tukang Rp 92,000.00 Rp 138,000.00 Rp 138,000.00 0.1200 hrn Mandor Rp 110,000.00 Rp 13,200.00 Rp 13,200.00 3.5758 m2 Pengecatan minyak Rp 26,729.00 Rp 95,578.09 Rp 95,578.09

Jumlah Rp 4,984,550.00 1 Unit Besi Panjat Lingkaran

25.4400 m Pipa Galvanis Ø 3" medium A Rp 290,000.00 Rp 7,377,600.00 Rp 7,377,600.00 169.6100 m Pipa Galvanis Ø 2" medium A Rp 140,000.00 ### Rp 23,745,400.00 2.1800 hrn Pekerja Rp 69,000.00 Rp 150,420.00 Rp 150,420.00 4.1400 hrn Tukang Rp 83,000.00 Rp 343,620.00 Rp 343,620.00 1.5000 hrn Kepala Tukang Rp 92,000.00 Rp 138,000.00 Rp 138,000.00 0.1200 hrn Mandor Rp 110,000.00 Rp 13,200.00 Rp 13,200.00 35.6941 m2 Pengecatan minyak Rp 26,729.00 Rp 954,068.94 Rp 954,068.94

Jumlah ###1 Unit Halang Rintang

64.8000 m Pipa Galvanis Ø 2" medium A Rp 140,000.00 Rp 9,072,000.00 Rp 9,072,000.00 14.4000 m2 Atap Terpal Canvas Rp 135,000.00 Rp 1,944,000.00 Rp 1,944,000.00 7.0400 m3 rollag bata Rp 218,526.00 Rp 1,538,423.04 Rp 1,538,423.04 31.0000 m tali tambang Rp 40,000.00 Rp 1,240,000.00 Rp 1,240,000.00 0.0896 m3 Papan ulin 2x20x400cm Rp 4,050,000.00 Rp 362,880.00 Rp 362,880.00 2.1800 hrn Pekerja Rp 69,000.00 Rp 150,420.00 Rp 150,420.00 4.1400 hrn Tukang Las Rp 83,000.00 Rp 343,620.00 Rp 343,620.00 1.5000 hrn Kepala Tukang Las Rp 92,000.00 Rp 138,000.00 Rp 138,000.00 0.1200 hrn Mandor Rp 110,000.00 Rp 13,200.00 Rp 13,200.00 7.3620 m2 Pengecatan dinding weather shield Rp 32,163.60 Rp 236,788.42 Rp 236,788.42 11.8584 m2 Pengecatan minyak Rp 26,729.00 Rp 316,963.17 Rp 316,963.17

Jumlah ###

Page 28: Cco Taman Cerdas Pkk 26-11-2013

#Analisa Harga Satuan Page 28

ANALISA HARGA SATUAN PEKERJAAN : PEMBANGUNAN TAMAN CERDAS/PINTAR PKK JL. S. PARMAN LOKASI : KOTA SAMARINDA

VOL. Satuan Uraian PekerjaanHarga

Harga Satuan(Rp.)

Bahan(Rp.)

Upah(Rp.)

JUMLAH(Rp.)

1 Unit Monumen Tambangan 0.900 cor rabat panggung miniatur tambanga Rp 679,605.40 Rp 611,644.86 Rp 611,644.86 6.460 Plester + Aci t:15 camp.1pc3ps Rp 43,847.00 Rp 283,251.62 Rp 283,251.62 0.240 Balok Ulin 10x10x400 tiang penyangga Rp 3,850,000.00 Rp 924,000.00 Rp 924,000.00 1.000 bh Miniatur Perahu tambangan ### ### Rp 10,000,000.00 2.1800 hrn Pekerja Rp 69,000.00 Rp 150,420.00 Rp 150,420.00 4.1400 hrn Tukang Las Rp 83,000.00 Rp 343,620.00 Rp 343,620.00 1.5000 hrn Kepala Tukang Las Rp 92,000.00 Rp 138,000.00 Rp 138,000.00 0.1200 hrn Mandor Rp 110,000.00 Rp 13,200.00 Rp 13,200.00 6.4600 m2 Pengecatan dinding weather shield Rp 32,163.60 Rp 207,776.86 Rp 207,776.86

Jumlah ###1 Unit Lungsuran Beton

31.119 Rolag pas. bata Rp 218,526.00 Rp 6,800,310.59 Rp 6,800,310.59 74.497 m2 Plester + Aci t:15 camp.1pc3ps Rp 43,847.00 Rp 3,266,469.96 Rp 3,266,469.96 74.497 Bekesting Rp 292,286.31 ### Rp 21,774,453.20 2.1800 hrn Pekerja Rp 69,000.00 Rp 150,420.00 Rp 150,420.00 4.1400 hrn Tukang Las Rp 83,000.00 Rp 343,620.00 Rp 343,620.00 1.5000 hrn Kepala Tukang Las Rp 92,000.00 Rp 138,000.00 Rp 138,000.00 0.1200 hrn Mandor Rp 110,000.00 Rp 13,200.00 Rp 13,200.00 74.4970 m2 Pengecatan dinding weather shield Rp 32,163.60 Rp 2,396,091.71 Rp 2,396,091.71

Jumlah ###1 M Pagar Besi + Kawat seling

0.0079 Rabat Beton/ Beton Tumbuk Rp 679,605.40 Rp 5,345.96 Rp 5,345.96 3.2000 m kawat seling 6mm Rp 13,000.00 Rp 41,600.00 Rp 41,600.00 3.0000 bh klem sling (kuku macan) 1/4 Rp 2,300.00 Rp 6,900.00 Rp 6,900.00 0.0530 Kg Besi beton 6mm dibentuk cincin (dilas p Rp 23,358.76 Rp 1,238.01 Rp 1,238.01 1.4200 m Pipa Galvanis 3" Medium A Rp 140,000.00 Rp 198,800.00 Rp 198,800.00 0.0942 m Cat Minyak Pagar Rp 26,729.00 Rp 2,518.94 Rp 2,518.94 0.1429 hrn Pekerja Rp 69,000.00 Rp 9,857.14 Rp 9,857.14 0.1548 hrn Tukang Las Rp 83,000.00 Rp 12,845.24 Rp 12,845.24 0.1190 hrn Kepala Tukang Las Rp 92,000.00 Rp 10,952.38 Rp 10,952.38 0.0238 hrn Mandor Rp 110,000.00 Rp 2,619.05 Rp 2,619.05

Jumlah Rp 292,676.73 PEKERJAAN LANTAI

1 M2 Lantai Keramik 20x20 13.2600 bh Keramik 20x20 setara Roman Rp 3,800.00 Rp 50,388.00 Rp 50,388.00 9.8000 kg Semen @ 50 kg Rp 1,400.00 Rp 13,720.00 Rp 13,720.00 0.0450 m3 Pasir Pasang Rp 105,000.00 Rp 4,725.00 Rp 4,725.00 1.3000 Kg Semen Warna Rp 1,450.00 Rp 1,885.00 Rp 1,885.00 0.7000 hrn Pekerja Rp 69,000.00 Rp 48,300.00 Rp 48,300.00 0.3500 hrn Tukang Rp 83,000.00 Rp 29,050.00 Rp 29,050.00 0.0350 hrn Kepala Tukang Rp 92,000.00 Rp 3,220.00 Rp 3,220.00 0.0350 hrn Mandor Rp 110,000.00 Rp 3,850.00 Rp 3,850.00

Jumlah Rp 155,138.00 1 unit Rambu Lalu Lintas

0.0475 m3 Rabat Beton/ Beton Tumbuk Rp 679,605.40 Rp 32,302.49 Rp 32,302.49 2.3000 m Pipa Galvanis Ø 2" medium A Rp 140,000.00 Rp 322,000.00 Rp 322,000.00 0.7800 m2 Plat Alumunium 0,3 mm (Bibir plat ditek Rp 75,000.00 Rp 58,500.00 Rp 58,500.00 2.0000 bh klem pipa galvanis 2" Rp 5,000.00 Rp 10,000.00 Rp 10,000.00 156.0000 cm2 Scotlite Stiker 2 lapis (2 warna) Rp 200.00 Rp 31,200.00 Rp 31,200.00 0.5042 m Cat Minyak Rp 26,729.00 Rp 13,476.76 Rp 13,476.76 0.1429 hrn Pekerja Rp 69,000.00 Rp 9,857.14 Rp 9,857.14 0.1548 hrn Tukang Rp 83,000.00 Rp 12,845.24 Rp 12,845.24 0.1190 hrn Kepala Tukang Rp 92,000.00 Rp 10,952.38 Rp 10,952.38 0.0238 hrn Mandor Rp 110,000.00 Rp 2,619.05 Rp 2,619.05

Jumlah Rp 503,753.07 1 Unit Mading

1.0000 lbr Plywood Tebal 9 mm Rp 99,000.00 Rp 99,000.00 Rp 99,000.00 1.0000 lbr Plywood Mika (putih) 3mm Rp 60,000.00 Rp 60,000.00 Rp 60,000.00 0.2170 m3 Balok Bengkirai Rp 3,400,000.00 Rp 737,800.00 Rp 737,800.00 1.8500 hrn Pekerja Rp 69,000.00 Rp 127,650.00 Rp 127,650.00 3.1400 hrn Tukang Rp 83,000.00 Rp 260,620.00 Rp 260,620.00 1.2000 hrn Kepala Tukang Rp 92,000.00 Rp 110,400.00 Rp 110,400.00 0.1200 hrn Mandor Rp 110,000.00 Rp 13,200.00 Rp 13,200.00 3.0104 m2 Pengecatan minyak Rp 26,729.00 Rp 80,464.98 Rp 80,464.98

Jumlah Rp 1,408,670.00

m3

m2

m3

m3

m2

m3

Page 29: Cco Taman Cerdas Pkk 26-11-2013

#Analisa Harga Satuan Page 29

ANALISA HARGA SATUAN PEKERJAAN : PEMBANGUNAN TAMAN CERDAS/PINTAR PKK JL. S. PARMAN LOKASI : KOTA SAMARINDA

VOL. Satuan Uraian PekerjaanHarga

Harga Satuan(Rp.)

Bahan(Rp.)

Upah(Rp.)

JUMLAH(Rp.)

PEKERJAAN CAT-CATAN

1 M2

0.1000 kg Plamir Rp 30,000.00 Rp 3,000.00 Rp 3,000.00 0.1000 kg Cat Dasar Rp 35,000.00 Rp 3,500.00 Rp 3,500.00 0.2600 kg Cat Penutup 2 kali setara mowilex Rp 70,000.00 Rp 18,200.00 Rp 18,200.00 0.0200 hrn Pekerja Rp 69,000.00 Rp 1,380.00 Rp 1,380.00 0.0630 hrn Tukang Rp 83,000.00 Rp 5,229.00 Rp 5,229.00 0.0063 hrn Kepala Tukang Rp 92,000.00 Rp 579.60 Rp 579.60 0.0025 hrn Mandor Rp 110,000.00 Rp 275.00 Rp 275.00

Jumlah Rp 32,163.60 1 M2 Cat Minyak

0.20000 kg Cat meni besi Rp 32,000.00 Rp 6,400.00 Rp 6,400.00 0.26000 kg Cat penutup 2 x setara Altek Rp 45,000.00 Rp 11,700.00 Rp 11,700.00 0.50000 lbr Amplas Rp 2,500.00 Rp 1,250.00 Rp 1,250.00 0.02000 hrn Pekerja Rp 69,000.00 Rp 1,380.00 Rp 1,380.00 0.06300 hrn Tukang cat Rp 83,000.00 Rp 5,229.00 Rp 5,229.00 0.00700 hrn Mandor Rp 110,000.00 Rp 770.00 Rp 770.00

Jumlah Rp 26,729.00 PEKERJAAN PERBAIKAN

1 M Perbaikan Parit Existing 0.1300 m3 Pas. Batu gunung Rp 300,000.00 Rp 39,000.00 Rp 39,000.00 4.0000 kg Semen pc Rp 1,400.00 Rp 5,600.00 Rp 5,600.00 0.0150 m3 pasir pasang Rp 105,000.00 Rp 1,575.00 Rp 1,575.00 1.5000 m2 Plester+ aci Rp 43,847.00 Rp 65,770.50 Rp 65,770.50

1.50 hrn Pekerja Rp 69,000.00 Rp 103,500.00 Rp 103,500.00 0.75 hrn Tukang Batu Rp 83,000.00 Rp 62,250.00 Rp 62,250.00 0.45 hrn Kepala Tukang Batu Rp 92,000.00 Rp 41,400.00 Rp 41,400.00 0.02 hrn Mandor Rp 110,000.00 Rp 2,200.00 Rp 2,200.00 1.00 lot Peralatan Rp 12,500.00 Rp 12,500.00 Rp 12,500.00

Jumlah Rp 333,795.50 1 unit Perbaikan Jembatan Existing

0.0800 m3 balok ulin 10/10 Rp 3,850,000.00 Rp 308,000.00 Rp 308,000.00 0.0800 m3 papan ulin Rp 4,050,000.00 Rp 324,000.00 Rp 324,000.00 0.8000 m3 tanah urug dipadatkan Rp 114,506.00 Rp 91,604.80 Rp 91,604.80 0.4000 m3 pasir dipadatkan t:10cm Rp 136,336.73 Rp 54,534.69 Rp 54,534.69 1.5000 m2 paving block Rp 238,448.37 Rp 357,672.56 Rp 357,672.56

1.50 hrn Pekerja Rp 69,000.00 Rp 103,500.00 Rp 103,500.00 0.75 hrn Tukang Batu Rp 83,000.00 Rp 62,250.00 Rp 62,250.00 0.45 hrn Kepala Tukang Batu Rp 92,000.00 Rp 41,400.00 Rp 41,400.00 0.02 hrn Mandor Rp 110,000.00 Rp 2,200.00 Rp 2,200.00 1.00 lot Peralatan Rp 12,500.00 Rp 12,500.00 Rp 12,500.00

Jumlah Rp 1,357,662.05

Cat Eksterior (1:Plamir, 1:Cat Dasar dan 2:Cat Penutup )

Page 30: Cco Taman Cerdas Pkk 26-11-2013

DAFTAR HARGA SATUAN BAHAN DAN UPAH

PEKERJAAN : PEMBANGUNAN TAMAN CERDAS/PINTAR PKK JL. S. PARMAN

LOKASI : KOTA SAMARINDA

HARGA SATUAN

NO. JENIS BAHAN BANGUNAN SATUAN BAHAN KETERANGAN

( Rp )

I BAHAN PASANGAN

1 Batu Gunung M3 300,000.00 Di Lokasi2 Pasir Urug M3 85,000.00 Di Lokasi3 Pasir Pasang M3 105,000.00 Di Lokasi4 Pasir Beton ex. material Palu (dalam kubik) M3 240,000.00 Di Lokasi5 Pasir Beton ex. material Palu (dalam kg) Kg 150.00 Di Lokasi6 Koral Beton ex. material Palu (dalam kubik) M3 280,000.00 Di Lokasi7 Koral Beton ex. material Palu (dalam kg) Kg 186.67 Di Lokasi8 Batu Bata Bh 750.00 Di Lokasi9 Glass Block 20x20 Bh 25,000.00 Di Lokasi10 Batu Alam M2 250,000.00 Di Lokasi10 Semen PC sak 70,000.00 Di Lokasi11 Semen PC Kg 1,400.00 Di Lokasi12 Semen Warna Kg 1,450.00 Di Lokasi13 Tanah Urug Biasa M3 60,000.00 Di Lokasi14 Tanah Urug Pilihan M3 75,000.00 Di Lokasi15 Tanah Urug Top Soil / Humus M3 110,000.00 Di Lokasi16 Air Bersih Ltr 90.00 Di Lokasi17 Kansteen 10x20x400 bh 25,000.00 Di Lokasi18 Kerikil Jagung @20kg Karung 210,000.00 Di Lokasi19 Kerikil / Split M3 230,000.00 Di Lokasi20 Miniatur Kapal Tambangan bh 10,000,000.00 Di Lokasi

II BAHAN TANAMAN

1 Bayan-bayaman (15-25 cm) Polybag 2,500.00 Di Lokasi2 Rumput Gajah M2 15,000.00 Di Lokasi3 Pupuk Kandang kg 2,500.00 Di Lokasi4 Pupuk NPK kg 17,000.00 Di Lokasi5 Kucai 10cm (15-25) Polybag 5,000.00 Di Lokasi6 Asoka 10cm (15-25) Polybag 7,500.00 Di Lokasi7 Bakung 10cm (25-40) Polybag 6,000.00 Di Lokasi8 Sugata 10cm (10-30) Polybag 7,500.00 Di Lokasi9 Pandan Belgia 10cm (15-25) Polybag 7,500.00 Di Lokasi10 Pucuk Merah 10cm (30-100) Polybag 105,000.00 Di Lokasi

III BAHAN KAYU

1 Balok Ulin M3 3,850,000.00 Di Lokasi2 Papan Ulin M3 4,050,000.00 Di Lokasi3 Papan Bengkirai M3 3,750,000.00 Di Lokasi4 Balok Bengkirai M3 3,400,000.00 Di Lokasi5 Papan Meranti M3 2,750,000.00 Di Lokasi6 Balok Meranti M3 2,500,000.00 Di Lokasi7 Dolken Kayu Galam dia. 6-8 cm / 4 m Btg 6,500.00 Di Lokasi8 Dolken Kayu Galam dia. 6-8 cm / 5 m Btg 10,000.00 Di Lokasi

IV BAHAN LANGIT-LANGIT

1 Plywood Tebal 3 mm Lbr 42,000.00 Di Lokasi2 Plywood Tebal 9 mm Lbr 99,000.00 Di Lokasi3 Gypsum Board Tebal 9 mm Lbr 55,000.00 Di Lokasi4 Calciboard Tebal 6 mm Lbr 80,000.00 Di Lokasi5 List Gypsum M 22,000.00 Di Lokasi6 Tepung Gypsum Kg 2,500.00 Di Lokasi7 Plywood mika tebal 3mm Lbr 60,000.00 Di Lokasi

Page 31: Cco Taman Cerdas Pkk 26-11-2013

DAFTAR HARGA SATUAN BAHAN DAN UPAH

PEKERJAAN : PEMBANGUNAN TAMAN CERDAS/PINTAR PKK JL. S. PARMAN

LOKASI : KOTA SAMARINDA

HARGA SATUAN

NO. JENIS BAHAN BANGUNAN SATUAN BAHAN KETERANGAN

( Rp )

V BAHAN LANTAI

1 Keramik 60 x 60 Bh 120,000.00 Di Lokasi2 Keramik 40 x 40 Bh 25,000.00 Di Lokasi3 Keramik 30 x 30 Bh 7,500.00 Di Lokasi4 Keramik 20 x 20 Bh 3,800.00 Di Lokasi5 Keramik 20 x 25 Bh 4,600.00 Di Lokasi6 Border Keramik 5x20 Bh 10,000.00 Di Lokasi7 Paving Block M2 165,000.00 Di Lokasi

VI BAHAN PIPA DAN SANITER

1 Kloset Duduk Bh 2,000,000.00 Dilokasi2 Meja Wastafel + Meja Keramik Bh 2,500,000.00 Dilokasi3 Urinoir Bh 1,200,000.00 Dilokasi4 Bak Mandi Keramik Bh 700,000.00 Dilokasi5 Kran Air 1/2" Bh 85,000.00 Dilokasi6 Floor Drain 2" Bh 65,000.00 Dilokasi7 Roof Drain 4" Bh 150,000.00 Dilokasi8 Pipa PVC Tipe AW 2" M 17,500.00 Dilokasi9 Pipa PVC Tipe AW 4" M 45,000.00 Dilokasi10 Pipa PVC Tipe AW 1/2" M 6,000.00 Dilokasi11 Pipa PVC Tipe AW 3/4" M 8,000.00 Dilokasi12 M 65,000.00 Dilokasi13 M 140,000.00 Dilokasi14 M 290,000.00 Dilokasi15 Plat Alumunium 0,3 mm m2 75,000.00 Dilokasi16 Besi Siku 50x50x3mm M 31,000.00 Dilokasi17 Klem Pipa 2" bh 5,000.00 Dilokasi

VII BAHAN PAKU

1 Paku Biasa Kg 13,000.00 Di Lokasi2 Paku Plywood Kg 27,500.00 Di Lokasi3 Paku Genteng Metal Kg 24,000.00 Di Lokasi4 Paku Gypsum Kg 24,000.00 Di Lokasi5 Skrup Fixer Bh 250.00 Di Lokasi6 Sealant Tube 22,500.00 Di Lokasi7 Bearing bh 42,500.00 Di Lokasi

VIII BAHAN ATAP

1 Atap Metal setara Multi Roof Lbr 100,000.00 Di Lokasi2 Nok Genteng Metal Bh 44,000.00 Di Lokasi3 Seng Gelombang BJLS 20 Lbr 38,500.00 Di Lokasi4 Terpal Canvas M2 135,000.00 Di Lokasi5 Tali Tambang M 40,000.00 Di Lokasi

IX BAHAN KACA

1 Kaca Polos Tebal 5 mm M2 117,500.00 Di Lokasi2 Kaca Rayben Tebal 8 mm M2 240,000.00 Di Lokasi

Pipa Galvanis Ø 1" medium A

Pipa Galvanis Ø 2" medium A

Pipa Galvanis Ø 3" medium A

Page 32: Cco Taman Cerdas Pkk 26-11-2013

DAFTAR HARGA SATUAN BAHAN DAN UPAH

PEKERJAAN : PEMBANGUNAN TAMAN CERDAS/PINTAR PKK JL. S. PARMAN

LOKASI : KOTA SAMARINDA

HARGA SATUAN

NO. JENIS BAHAN BANGUNAN SATUAN BAHAN KETERANGAN

( Rp )

X BAHAN BESI, KAWAT & ALUMUNIUM

1 Besi Beton Polos Kg 15,000.00 Di Lokasi2 Besi Beton Ulir Kg 17,500.00 Di Lokasi3 Kawat Bendrat Kg 22,000.00 Di Lokasi4 Kusen Alumunium 4" Warna M 135,000.00 Dipasang5 Rangka Plafond Besi Hollow M2 125,000.00 Dipasang6 Rangka Atap Baja Ringan M2 220,000.00 Dipasang7 Rantai Besi 5 cm M 75,000.00 Di Lokasi8 Kawat Selling 6mm M 13,000.00 Di Lokasi9 Klem Seling (kuku macan) 1/4 bh 2,300.00 Di Lokasi

XI BAHAN FINISHING

1 Cat Meni Kg 28,000.00 Di Lokasi2 Meni Besi Kg 32,000.00 Di Lokasi2 Plamir Kayu Kg 40,000.00 Di Lokasi3 Plamir Tembok Kg 30,000.00 Di Lokasi4 Cat Minyak Kg 45,000.00 Di Lokasi4 Cat Dasar Kayu Kg 30,000.00 Di Lokasi5 Cat Dasar Tembok Kg 35,000.00 Di Lokasi6 Cat Tembok Interior setara Mowilex Kg 50,000.00 Di Lokasi7 Cat Tembok Eksterior Weather Shield setara Mowilex Kg 70,000.00 Di Lokasi8 Kertas Gosok / Amplas Lbr 2,500.00 Di Lokasi9 Minyak Bekisting Ltr 20,000.00 Di Lokasi10 Lem Kayu Kg 28,000.00 Di Lokasi

XII BAHAN PINTU DAN JENDELA

1 Pintu Aluminium Double ( termasuk aksesoris, tanpa kaca ) Unit 2,750,000.00 Dipasang2 Pintu Aluminium Tunggal ( termasuk aksesoris, tanpa kaca ) Unit 2,400,000.00 Dipasang3 Jendela Kaca Aluminium Besar ( termasuk aksesoris & kaca 5 mm ) Unit 600,000.00 Dipasang4 Jendela Kaca Aluminium Kecil ( termasuk aksesoris & kaca 5 mm ) Unit 400,000.00 Dipasang5 Daun Pintu Panil Kayu Bengkirai Unit 850,000.00 Di Lokasi6 Daun Jendela Kayu Bengkirai Unit 300,000.00 Di Lokasi7 Engsel Pintu 4'' Bh 25,000.00 Di Lokasi8 Kunci Pintu Tanam Besar Bh 300,000.00 Di Lokasi9 Kunci Pintu Kamar Mandi Bh 150,000.00 Di Lokasi10 Expanyolette / Kunci Tanam Bh 175,000.00 Di Lokasi

HARGA SATUAN

NO J E N I S U P A H SATUAN UPAH KETERANGAN

( Rp )

1 Pekerja Biasa OH 69,000.00 Perorang2 Mandor OH 110,000.00 Perorang

3 Tukang Batu OH 83,000.00 Perorang4 Kepala Tukang Batu OH 92,000.00 Perorang5 Tukang Kayu OH 83,000.00 Perorang6 Kepala Tukang Kayu OH 92,000.00 Perorang7 Tukang Cat OH 83,000.00 Perorang8 Kepala Tukang Cat OH 92,000.00 Perorang9 Tukang Besi OH 83,000.00 Perorang10 Kepala Tukang Besi OH 92,000.00 Perorang11 Tukang Las OH 83,000.00 Perorang12 Kepala Tukang Las OH 92,000.00 Perorang13 Tukang OH 83,000.00 Perorang14 Kepala Tukang OH 92,000.00 Perorang

Page 33: Cco Taman Cerdas Pkk 26-11-2013

JADWAL WAKTU PELAKSANAANPROGRAM : PENGELOLAAN RUANG TERBUKA HIJAU (RTH)KEGIATAN : PENINGKATAN / REHAB TAMAN DAN MEDIAN JALAN KOTA SAMARINDAPEKERJAAN : PEMBANGUNAN TAMAN CERDAS/PINTAR PKK JL. S. PARMANLOKASI : KOTA SAMARINDA

NO URAIAN PEKERJAAN

WAKTU PELAKSANAAN 75 HARI

KET BULAN KE 1 BULAN KE 2 BULAN KE 3

1 2 3 4 5 6 7 8 9 10 11

A PEKERJAAN PERSIAPAN1 Papan Nama Proyek 0.05 0.05

2 Pembersihan Lokasi 1.12 0.56 0.56

3 Pekerjaan Perapihan/pembongkaran 1.48 0.74 0.74

4 Direksi Keet 0.48 0.48

5 Gudang bahan & Los kerja 0.73 0.73

6 Fasilitas Listrik & Air Kerja sementara 0.19 0.19

7 Security/ Keamanan Proyek 0.37 0.19 0.19

9 Asbuiltdrawing/Shopdrawing/Dokumentasi 0.14 0.07 0.07

B PEKERJAAN LAHAN1 Jalan + Acc

1.1 Timbunan Tanah dari luar site (pemerataan area 3.19 3.19

1.2 Pasir Urug t : 5cm 0.52 0.52

1.3 Paving Block 18.34 9.17 9.17

1.4 Kansteen 10x20x40cm (finis cat minyak) 4.91 2.46 2.46

1.5 Lantai Kerja cor rabat t : 10cm 2.01 2.01

1.6 Koral Sikat 7.45 3.73 3.73

1.7 Pagar Pipa Besi 2,5" + kawat seling galvanis 6 7.19 3.59 3.59

1.8 Rambu Lalu Lintas 0.93 0.93

2 Area Monumen Pesut2.1 lantai kerja cor rabat (t:variasi) 2.42 1.21 1.21

2.2 Koral sikat 3.74 1.87 1.87

2.3 Keramik 40x40 0.67 0.67

2.4 Batu Templek 0.39 0.39

2.5 Patung Pesut 4.68 2.34 2.34

2.6 Mading white board (122x144) 0.13 0.13

3 Area Monumen Tambangan3.1 lantai kerja cor rabat (t:10cm) 0.24 0.24

3.2 Rolag pas. bata 2.14 2.14

3.3 Plester + Aci t:15 camp.1pc3ps 2.02 2.02

3.4 Pengecatan Dinding Watershaled 1.48 1.48

3.5 Miniatur tambangan 1.18 1.18

3.6 Mading white board (122x144) 0.13 0.13

4 Area Skate Park4.1 Paris Urug 0.07 0.07

4.2 Pondasi batu kosong (aanstamping) 0.57 0.57

4.3 lantai kerja cor rabat (t:10cm) 1.19 1.19

4.4 Rolag pas. bata 1.07 0.54 0.54

4.5 Plester + Aci t:15 camp.1pc3ps 0.65 0.65

4.6 Pengecatan Dinding Watershaled 0.48 0.48

5 Area Play Ground5.1 lantai kerja cor rabat (t:10cm) 2.04 2.04

5.2 Peluncuran (Perosotan) 0.80 0.80

5.3 Jungkat-Jungkit 0.37 0.37

5.4 Ayunan 0.46 0.46

5.5 Besi Panjat Lingkaran 2.95 1.47 1.47

5.6 Halang Rintang 1.37 0.69 0.69

6 Area Taman Bunga6.1 Rolag pas. bata 0.02 0.02

6.2 Papan Nama (TAMAN CERDAS) stainless steel 0.69 0.34 0.34

6.3 Pipa besi stainless steel 2,5" penyangga papan 0.34 0.34

7 LANSEKAP 1 Timbunan Tanah Top soil 2.84 1.42 1.42

2 Pemberian Pupuk Kandang 2.51 1.26 1.26

3 Pemberian Pupuk NPK 1.43 0.72 0.72

4 Penanaman Rumput 6.37 2.12 2.12 2.12

5 Penanaman Kucai 0.57 0.28 0.28

6 Penanaman Asoka Lombok 0.78 0.39 0.39

7 Penanaman Bakung 0.65 0.33 0.33

8 Penanaman Sugata 0.78 0.39 0.39

9 Penanaman Pandan Belgia 0.78 0.39 0.39

10 Penanaman Pucuk Merah 0.23 0.11 0.11

8 PEKERJAAN LAIN-LAIN1 Perbaikan Parit Existing 1.45 0.73 0.73

2 Perbaikan Jembatan 0.13 0.13

3 Pembersihan akhir lokasi 0.09 0.09

JUMLAH 100.00

BOBOT RENCANA KEMAJUAN MINGGUAN 1.61 2.95 4.15 14.55 31.52 29.82 9.00 5.46 0.73 0.13 0.09 BOBOT REALISASI KEMAJUAN MINGGUAN 1.61 4.56 8.71 23.26 54.78 84.60 93.59 99.05 99.78 99.91 100.0 DEVIASI