BACK UP DATA PENGUKURAN TIMBUNAN
KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATUR
PEKERJAAN :
:
LOKASI : KABUPATEN BENGKALIS
TAHUN ANGGARAN: 2015
NoPanjang Lebar Tinggi Luas Volume
M M M M2 M3
1 1.000 ### 0.700 1.000 0.700
2 1.000 5.700 0.950 5.700 5.415
3 2.100 3.300 0.950 6.930 6.584
4 1.000 5.700 0.950 5.700 5.415
5 1.000 2.100 0.950 2.100 1.995
6 3.300 1.000 0.900 3.300 2.970
7 3.300 5.700 0.980 18.810 18.434
8 3.300 ### 0.850 10.890 9.257
9 3.300 5.700 1.200 18.810 22.572
10 3.300 2.150 1.050 7.095 7.450
11 3.350 0.960 0.900 3.216 2.894
12 3.350 5.700 1.050 19.095 20.050
13 3.350 3.300 0.950 11.055 10.502
14 3.350 5.700 1.100 19.095 21.005
15 3.350 2.150 1.000 7.203 7.203
16 3.420 0.950 0.900 3.249 2.924
17 3.420 5.700 1.050 19.494 20.469
18 3.420 3.300 0.980 11.286 11.060
19 3.420 5.700 0.850 19.494 16.570
20 3.420 2.150 0.850 7.353 6.250
21 3.350 0.950 0.900 3.183 2.864
22 3.350 5.700 0.920 19.095 17.567
23 3.350 3.300 0.950 11.055 10.502
24 3.350 5.700 0.920 19.095 17.567
25 3.350 2.150 0.980 7.203 7.058
26 3.320 1.000 0.900 3.320 2.988
27 3.320 5.700 0.850 18.924 16.085
28 3.320 3.300 0.820 10.956 8.984
SUB TOTAL 293.705 283.334
Diperiksa Oleh : Dibuat Oleh :
KONSULTAN PENGAWAS KONTRAKTOR PELAKSANACV. MULTY DESEKO PT. TIGA PUTRA WIJAYA
LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS
Kuantitas ( N )
Lembar 2
ADE DESRY KURNIAWAN, A.Md MUSMULYADIInspector Pelaksana Lapangan
Lembar 3
BACK UP DATA PENGUKURAN TIMBUNAN
KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATUR
PEKERJAAN :
:
LOKASI : KECAMATAN BENGKALIS
TAHUN ANGGARAN: 2015
NoPanjang Lebar Tinggi Luas Volume
M M M M2 M3
29 3.320 5.700 0.800 18.924 15.139
30 3.320 2.150 0.780 7.138 5.568
31 2.130 0.900 0.550 1.917 1.054
32 2.130 5.700 0.580 12.141 7.042
33 2.130 3.300 0.800 7.029 5.623
34 2.130 5.700 0.850 12.141 10.320
35 2.130 3.360 0.670 7.157 4.795
36 3.350 0.900 0.450 3.015 1.357
37 3.350 5.700 0.450 19.095 8.593
38 3.350 3.300 0.450 11.055 4.975
39 3.350 5.700 0.650 19.095 12.412
40 3.350 0.900 0.520 3.015 1.568
41 3.350 2.250 0.600 7.538 4.523
42 3.400 3.300 0.550 11.220 6.171
43 3.400 2.100 0.480 7.140 3.427
44 3.400 3.300 0.480 11.220 5.386
45 3.400 0.900 0.500 3.060 1.530
46 3.400 2.250 0.500 7.650 3.825
47 3.400 3.300 0.520 11.220 5.834
48 3.400 2.250 0.550 7.650 4.208
49 3.400 3.300 0.550 11.220 6.171
50 3.400 0.900 0.500 3.060 1.530
51 3.400 2.250 0.500 7.650 3.825
52 3.400 0.930 0.600 3.162 1.897
53 3.400 5.700 0.550 19.380 10.659
54 3.400 3.300 0.650 11.220 7.293
55 3.400 5.700 0.500 19.380 9.690
56 - -
SUB TOTAL 263.491 154.413
Diperiksa Oleh : Dibuat Oleh :
KONSULTAN PENGAWAS KONTRAKTOR PELAKSANACV. MULTY DESEKO PT. TIGA PUTRA WIJAYA
LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS
Kuantitas ( N )
Lembar 4
ADE DESRY KURNIAWAN, A.Md MUSMULYADIInspector Pelaksana Lapangan
Lembar 5
BACK UP DATA PENGUKURAN TIMBUNAN
KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATUR
PEKERJAAN :
:
LOKASI : KECAMATAN BENGKALIS
TAHUN ANGGARAN: 2015
NoPanjang Lebar Tinggi Luas Volume
M M M M2 M3
57 3.400 0.900 0.560 3.060 1.714
58 3.400 2.250 0.550 7.650 4.208
59 2.150 0.900 0.580 1.935 1.122
60 2.150 5.700 0.450 12.255 5.515
61 2.150 3.300 0.450 7.095 3.193
62 2.150 5.700 0.540 12.255 6.618
63 2.150 0.900 0.450 1.935 0.871
64 2.150 2.250 0.450 4.838 2.177
65 3.350 0.950 0.600 3.183 1.910
66 3.350 5.700 0.500 19.095 9.548
67 3.350 3.300 0.500 11.055 5.528
68 3.350 5.700 0.600 19.095 11.457
69 3.350 2.150 0.450 7.203 3.241
70 3.350 0.900 0.750 3.015 2.261
71 3.350 5.700 0.550 19.095 10.502
72 3.350 3.300 0.570 11.055 6.301
73 3.350 5.700 0.600 19.095 11.457
74 3.350 2.150 0.530 7.203 3.817
75 3.400 0.900 0.580 3.060 1.775
76 3.400 5.700 0.550 19.380 10.659
77 3.400 3.300 0.480 11.220 5.386
78 3.400 5.700 0.550 19.380 10.659
79 3.400 2.150 0.450 7.310 3.290
80 3.400 0.950 0.500 3.230 1.615
81 3.400 5.700 0.600 19.380 11.628
82 3.400 3.300 0.600 11.220 6.732
83 3.400 5.700 0.550 19.380 10.659
84 3.400 2.150 0.400 7.310 2.924
SUB TOTAL 290.985 156.764
Diperiksa Oleh : Dibuat Oleh :
KONSULTAN PENGAWAS KONTRAKTOR PELAKSANACV. MULTY DESEKO PT. TIGA PUTRA WIJAYA
LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS
Kuantitas ( N )
Lembar 6
ADE DESRY KURNIAWAN, A.Md MUSMULYADIInspector Pelaksana Lapangan
Lembar 7
BACK UP DATA PENGUKURAN TIMBUNAN
KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATUR
PEKERJAAN :
:
LOKASI : KECAMATAN BENGKALIS
TAHUN ANGGARAN: 2015
NoPanjang Lebar Tinggi Luas Volume
M M M M2 M3
85 3.350 0.950 0.450 3.183 1.432
86 3.350 5.700 0.500 19.095 9.548
87 3.350 3.300 0.500 11.055 5.528
88 3.350 5.700 0.450 19.095 8.593
89 3.350 2.150 0.400 7.203 2.881
90 1.000 0.970 0.550 0.970 0.534
91 1.000 5.700 0.450 5.700 2.565
92 2.160 3.300 0.400 7.128 2.851
93 0.980 5.700 0.460 5.586 2.570
94 0.970 2.150 0.450 2.086 0.938
95 6.980 6.950 0.480 48.511 23.285
96 6.980 5.700 0.520 39.786 20.689
SUB TOTAL 169.397 81.413
JUMLAH TOTAL TIMBUNAN ### 675.92
Diperiksa Oleh : Dibuat Oleh :
KONSULTAN PENGAWAS KONTRAKTOR PELAKSANACV. MULTY DESEKO PT. TIGA PUTRA WIJAYA
LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS
Kuantitas ( N )
Lembar 8
ADE DESRY KURNIAWAN, A.Md MUSMULYADIInspector Pelaksana Lapangan
Lembar 9
BACK UP DATA PENGUKURAN TIMBUNAN
PENINGKATAN SARANA DAN PRASARANA APARATUR
Keterangan
KONTRAKTOR PELAKSANAPT. TIGA PUTRA WIJAYA
LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS
Lembar 10
MUSMULYADIPelaksana Lapangan
Lembar 11
BACK UP DATA PENGUKURAN TIMBUNAN
PENINGKATAN SARANA DAN PRASARANA APARATUR
Keterangan
Salah Cat
KONTRAKTOR PELAKSANAPT. TIGA PUTRA WIJAYA
LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS
Lembar 12
MUSMULYADIPelaksana Lapangan
Lembar 13
BACK UP DATA PENGUKURAN TIMBUNAN
PENINGKATAN SARANA DAN PRASARANA APARATUR
Keterangan
KONTRAKTOR PELAKSANAPT. TIGA PUTRA WIJAYA
LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS
Lembar 14
MUSMULYADIPelaksana Lapangan
Lembar 15
BACK UP DATA PENGUKURAN TIMBUNAN
PENINGKATAN SARANA DAN PRASARANA APARATUR
Keterangan
KONTRAKTOR PELAKSANAPT. TIGA PUTRA WIJAYA
LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS
M3
Lembar 16
MUSMULYADIPelaksana Lapangan
R E K A P I T U L A S IRENCANA ANGGARAN BIAYA (RAB)
KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATUR PEKERJAAN :
NO. PAKET : 5/ULP/POKJA I/DINASPU/V/2015 LOKASI : KABUPATEN BENGKALIS TAHUN ANGGARAN : 2015
NO. URAIAN PEKERJAAN
A. LANTAI I ( SATU )
I PEKERJAAN PENDAHULUANII PEKERJAAN TANAH/ PASIRIII PEKERJAAN STRUKTUR
JUMLAH PEKERJAAN LANTAI - I -
B. LANTAI II ( DUA )
I PEKERJAAN STRUKTUR
JUMLAH PEKERJAAN LANTAI - II -
C. LANTAI III ( TIGA )
I PEKERJAAN STRUKTUR
JUMLAH PEKERJAAN LANTAI - III -
( A ) JUMLAH HARGA
( D ) DIBULATKAN
Terbilang :
LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS
( B ) PAJAK PERTAMBAHAN NILAI ( PPn ) = 10 % x ( A )( C ) JUMLAH TOTAL HARGA PEKERJAAN = ( A ) + ( B )
R E K A P I T U L A S IRENCANA ANGGARAN BIAYA (RAB)
PENINGKATAN SARANA DAN PRASARANA APARATUR
JUMLAH HARGAPEKERJAAN
( Rp )
34,637,355.10 397,044.00 570,757,500.41
605,791,899.51
1,358,357,925.39
1,358,357,925.39
694,889,627.68
694,889,627.68
2,659,039,452.57
265,903,945.26
2,924,943,397.83
2,924,943,000.00
Bengkalis, 18 Mei 2015 Penawar,
LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS
PT. TIGA PUTRA WIJAYA
SUDIRMAN, STKepala Cabang
DAFTAR KUANTITAS DAN HARGARencana Anggaran Biaya ( RAB )
KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATUR
PEKERJAAN :
NO. PAKET : 5/ULP/POKJA I/DINASPU/V/2015
LOKASI : KABUPATEN BENGKALIS
TAHUN ANGGARAN : 2015
NO. URAIAN PEKERJAAN SATUAN VOL
1 2 3 4
A. LANTAI I (SATU)
I PEKERJAAN PENDAHULUAN
1 Pek. Pembersihan Lokasi M2 826.97
2 Pek. Papan Nama Proyek Ls 1.00
3 Pek. Pembuatan Direksi Keet M2 20.00
II PEKERJAAN TANAH/ PASIR
1 Pek. Galian Tanah Pondasi M3 8.07
III PEKERJAAN STRUKTUR
1 Pek. Cor Balok Sloof ( 1S4 - 15/20 ) Beton + Tulangan + Bekisting ( K 250 ) M3 0.59 2 Pek. Cor Kolom Teras ( K9 ) Beton K 250 + Tulangan + Bekisting M3 3.91 3 Pek. Cor Kolom Lantai 1 Beton K 250 + Tulangan + Bekisting M3 71.59 4 Pek. Cor Kozen Pintu Utama Beton K 225 + Tulangan + Bekisting M3 1.50 5 Pek. Cor Balok Latey Selasar (B4 - 20/30) Beton K 225 + Tulangan + Bekisting Elv. + 2.25 m M3 8.78 6 Pek. Cor Plat Canopy Selasar T = 10 cm, Beton K 225 + Tulangan + Bekisting M3 4.77 7 Pek. Kepala Tiang Selasar 50/80, T = 10 cm, Beton K 225 + Tulangan + Bekisting M3 1.64
B. LANTAI II ( DUA )
I PEKERJAAN STRUKTUR
1 Pek. Cor Balok Lantai (2B6 30/60) Beton K 225 + Tulangan + Bekisting M3 3.89
2 Pek. Cor Balok Lantai ( 2B1 25/45 ) Beton K 225 + Tulangan + Bekisting M3 32.74
3 Pek. Cor Balok Lantai ( 2B2 25/45 ) Beton K 225 + Tulangan + Bekisting M3 4.05
4 Pek. Cor Balok Lantai ( 2B2 25/40 ) Beton K 225 + Tulangan + Bekisting M3 20.52
5 Pek. Cor Balok Lantai ( 2B4 20/35 ) Beton K 225 + Tulangan + Bekisting M3 16.38
LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS
NO. URAIAN PEKERJAAN SATUAN VOL
1 2 3 4
6 Pek. Cor Balok Lantai ( 2B5 15/20 ) Beton K 225 + Tulangan + Bekisting M3 2.86
7 Pek. Cor Balok Lantai ( 2B7 - 20/30 ) Beton K 225 + Tulangan + Bekisting M3 2.86
8 Pek. Cor Balok Latey Teras (2B1 25/45) Beton K 225 + Tulangan + Bekisting Elv, +3,35 cm M3 2.43
9 Pek. Cor Ring Balok Teras (3B1 25/45) Beton K 225 + Tulangan + Bekisting Elv, + 6.85 cm M3 2.43
10 Pek. Cor List Plank Teras T = 10 cm, Beton K 225 + Tulangan + Bekisting M3 4.54
11 Pek. Cor Plat Lantai K 225 + Tulangan + Bekisting M3 79.19
12 Pek. Cor Plat Daag Selasar T = 10 cm, Beton K 225 + Tulangan + Bekisting M3 18.81
13 Pek. Cor Kolom Lantai 2 Beton K 250 + Tulangan + Bekisting M3 34.34
14 Pek. Cor Kolom Pedastal 1 Elv + 4.00 s/d Elv + 5.00 Beton K 225 + Tulangan + Bekisting M3 0.54
15 Pek. Cor Ring Balok (RB3 20/30 ) Beton K 225 + Tulangan + Bekisting Elv. + 5.00 M3 3.00
NO. URAIAN PEKERJAAN SATUAN VOL
1 2 3 4
C. LANTAI III ( TIGA )
I PEKERJAAN STRUKTUR
1 Pek. Cor Balok Lantai (3B6 30/60) Beton K 225 + Tulangan + Bekisting M3 3.89
2 Pek. Cor Balok Lantai ( 3B1 25/45 ) Beton K 225 + Tulangan + Bekisting M3 20.39
3 Pek. Cor Balok Lantai ( 3B2 25/45 ) Beton K 225 + Tulangan + Bekisting M3 10.53
4 Pek. Cor Balok Lantai ( 3B3 25/40 ) Beton K 225 + Tulangan + Bekisting M3 18.24
5 Pek. Cor Balok Lantai ( 3B5 15/20 ) Beton K 225 + Tulangan + Bekisting M3 2.09
6 Pek. Cor Balok Lantai ( 3B7 20/30 ) Beton K 225 + Tulangan + Bekisting M3 1.58
7 Pek. Cor Plat Lantai K 225 + Tulangan + Bekisting M3 60.09
Bengkalis, 18 Mei 2015
PT. TIGA PUTRA WIJAYA
SUDIRMAN, ST
Kepala Cabang
DAFTAR KUANTITAS DAN HARGARencana Anggaran Biaya ( RAB )
HARGA SATUAN JUMLAH HARGA
(Rp) ( Rp)
5 6
1,830.00 1,513,355.10
350,000.00 350,000.00
1,638,700.00 32,774,000.00
Sub Jumlah 34,637,355.10
49,200.00 397,044.00
Sub Jumlah 397,044.00
5,982,884.80 3,529,902.03 6,278,226.85 24,547,866.98 6,278,226.85 449,458,260.19 6,278,226.85 9,417,340.28 5,253,897.60 46,129,220.93 5,591,616.34 26,672,009.94 6,709,085.40 11,002,900.06
Sub Jumlah 570,757,500.41
6,161,662.95 23,968,868.88
6,212,807.70 203,407,324.10
6,125,313.00 24,807,517.65
6,709,085.40 137,670,432.41
5,938,726.80 97,276,344.98
LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS
HARGA SATUAN JUMLAH HARGA
(Rp) ( Rp)
5 6
6,252,135.00 17,881,106.10
5,253,897.60 15,026,147.14
6,212,807.70 15,097,122.71
6,212,807.70 15,097,122.71
5,591,616.34 25,385,938.18
5,591,616.34 442,800,097.95
5,591,616.34 105,178,303.35
6,278,226.85 215,594,310.03
6,306,660.00 3,405,596.40
5,253,897.60 15,761,692.80
Sub Jumlah 1,358,357,925.39
HARGA SATUAN JUMLAH HARGA
(Rp) ( Rp)
5 6
6,161,662.95 23,968,868.88
6,212,807.70 126,679,149.00
6,125,313.00 64,499,545.89
6,709,085.40 122,373,717.70
6,252,135.00 13,066,962.15
5,253,897.60 8,301,158.21
5,591,616.34 336,000,225.86
Sub Jumlah 694,889,627.68
Bengkalis, 18 Mei 2015
Penawar,
PT. TIGA PUTRA WIJAYA
SUDIRMAN, ST
Kepala Cabang
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATURPEKERJAAN :
NO. PAKET : 5/ULP/POKJA I/DINASPU/V/2015LOKASI : KABUPATEN BENGKALISTAHUN ANGGARAN : 2015
No. Jenis Pekerjaan (Rp)
1 1 M2 MEMBERSIHKAN LOKASI DAN LAPANGAN
TENAGA Pekerja 0.0100 Oh 108,000.00 Mandor 0.0050 Oh 150,000.00
Jumlah
2 1 M2 PEK. KANTOR DIREKSI KEET, DEGAN LANTAI PLESTERAN
BAHAN Dolken Kayu Ø 8 - 10 / 400 cm 1.2500 Btg 30,000.00 Kayu Balok 0.0900 M3 2,750,000.00 Paku 0.6500 Kg 25,000.00 Besi Strip 1.1000 Kg 20,000.00 Semen Portland 35.0000 Kg 1,700.00 Pasir Pasang 0.1500 M3 425,000.00 Pasir Beton 0.1000 M3 465,000.00 Koral Beton 0.1300 M3 575,000.00 Bata Merah Kelas I 30.0000 Bh 1,200.00 Seng Plat 0.2500 Lbr 65,000.00 Jendela Nako 2.0000 Bh 185,000.00 Kaca Polos 0.0800 M2 95,000.00 Kunci Tanam 0.1500 Bh 110,000.00 Plywood 4 mm 0.0600 Lbr 95,000.00
TENAGA Tukang Kayu 2.0000 Oh 118,000.00 Tukang Batu 1.0000 Oh 118,000.00 Pekerja 2.0000 Oh 108,000.00 Kepala Tukang 0.3000 Oh 138,000.00 Mandor 0.0500 Oh 150,000.00
Jumlah
3 1 M2 PEMBUATAN BEDENG BURUH
BAHAN Dolken Kayu Ø 8 - 10 / 400 cm 1.2500 Btg 30,000.00 Kayu Balok 0.1860 M3 2,750,000.00 Paku 0.3000 Kg 25,000.00 Semen Portland 18.0000 Kg 1,700.00 Pasir Beton 0.0300 M3 465,000.00 Koral Beton 0.0500 M3 575,000.00 Seng Gelombang BJLS 32 0.2000 Lbr 110,000.00 Plywood 4 mm 1.3500 Lbr 95,000.00
TENAGA
LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS
Indeks dan Satuan
Harga Bahan dan Upah
No. Jenis Pekerjaan (Rp)
Indeks dan Satuan
Harga Bahan dan Upah
Tukang Kayu 2.0000 Oh 118,000.00 Pekerja 1.0000 Oh 108,000.00 Kepala Tukang 0.2000 Oh 138,000.00 Mandor 0.0500 Oh 150,000.00
Jumlah
4 1 M2 PENGUPASAN HUMUS TANAH
TENAGA Pekerja 0.1400 Oh 108,000.00 Mandor 0.0070 Oh 150,000.00
Jumlah
No. Jenis Pekerjaan (Rp)
Indeks dan Satuan
Harga Bahan dan Upah
5 1 M2 PENGUKURAN DAN PEMASANGAN BOWPLANK
BAHAN Kayu 5/7 0.0012 M3 2,200,000.00 Paku Biasa 2 - 5" 0.0200 Kg 25,000.00 Papan 3/20 0.0007 M3 1,800,000.00
TENAGA Tukang Kayu 0.1000 Oh 118,000.00 Pekerja 0.1000 Oh 108,000.00 Kepala Tukang 0.0100 Oh 138,000.00 Mandor 0.0050 Oh 150,000.00
Jumlah
6 1 M3 GALIAN TANAH SEDALAM 1 M
TENAGA Pekerja 0.4000 Oh 108,000.00 Mandor 0.0400 Oh 150,000.00
Jumlah
7 1 M3 URUGAN KEMBALI
TENAGA Pekerja 0.1920 Oh 108,000.00 Mandor 0.0400 Oh 150,000.00
Jumlah
8 1 M3 PEMADATAN ( PAKAI ALAT )
TENAGA Pekerja 0.5000 Oh 108,000.00 Mandor 0.0400 Oh 150,000.00
ALAT Jump Stamper 0.0500 Jam 150,000.00
Jumlah
9 1 M3 URUGAN TANAH BIASA
BAHAN Tanah Timbunan 1.2000 M3 165,000.00
TENAGA Pekerja 0.3300 Oh 108,000.00 Mandor 0.0100 Oh 150,000.00
Jumlah
10 1 M3 URUGAN TANAH PILIHAN
BAHAN Tanah Urugan Pilihan 1.2000 M3 350,000.00
TENAGA Pekerja 0.3000 Oh 108,000.00 Mandor 0.0100 Oh 150,000.00
ALAT
No. Jenis Pekerjaan (Rp)
Indeks dan Satuan
Harga Bahan dan Upah
Wheel Loader 0.0178 Jam 560,000.00 Dump Truck 0.2289 Jam 385,000.00 Vibro Roller 0.0100 Jam 485,000.00 Water Tanker 0.0070 Jam 278,000.00 Alat Bnatu 1.0000 Ls 5,000.00
Jumlah
No. Jenis Pekerjaan (Rp)
Indeks dan Satuan
Harga Bahan dan Upah
11 1 M3 TIMBUNAN PASIR URUG
BAHAN Pasir Urug 1.2000 M3 415,000.00
TENAGA Pekerja 0.3000 Oh 108,000.00 Mandor 0.0100 Oh 150,000.00
Jumlah
12 1 M3 TIMBUNAN AGREGRAT KELAS A
BAHAN Agregrat Kelas A 1.2000 M3 850,000.00
TENAGA Pekerja 0.0625 Oh 108,000.00 Mandor 0.0089 Oh 150,000.00
ALAT Wheel Loader 0.0089 Jam 560,000.00 Dump Truck 0.0284 Jam 385,000.00 Vibro Roller 0.0117 Jam 485,000.00 Water Tanker 0.0214 Jam 278,000.00 Alat Bnatu 1.0000 Ls 5,000.00
Jumlah
13 1 M3 URUGAN / RABAT KERIKIL
BAHAN Kerikil 1.2000 M3 575,000.00
TENAGA Pekerja 0.3000 Oh 108,000.00 Mandor 0.0100 Oh 150,000.00
Jumlah
14 1 M2 PEMADATAN ( PAKAI ALAT )
TENAGA Pekerja 0.5000 Oh 108,000.00 Mandor 0.0400 Oh 150,000.00
ALAT Jump Stamper 0.0500 Jam 150,000.00
Jumlah
15 1 M3 BETON COR 1:3:5
BAHAN Kerikil 0.8700 M3 575,000.00 Pasir Beton 0.5200 M3 465,000.00 Semen Porltand 218.0000 Kg 1,700.00
TENAGA Pekerja 1.6500 Oh 108,000.00 Tukang Batu 0.2500 Oh 118,000.00 Kepala Tukang 0.0250 Oh 138,000.00
No. Jenis Pekerjaan (Rp)
Indeks dan Satuan
Harga Bahan dan Upah
Mandor 0.0800 Oh 150,000.00
Jumlah
No. Jenis Pekerjaan (Rp)
Indeks dan Satuan
Harga Bahan dan Upah
16 1 Kg PEMBESIAN DENGAN BESI POLOS DAN ULIR
BAHAN Besi Beton 1.0500 Kg 14,000.00 Kawat Ikat Beton 0.0150 Kg 45,000.00
TENAGA Pekerja 0.0070 Oh 108,000.00 Tukang Besi 0.0070 Oh 118,000.00 Kepala Tukang 0.0070 Oh 138,000.00 Mandor 0.0030 Oh 150,000.00
Jumlah
17 1 Lbr WIRE MESH 5,4 x 2,1 TYPE M8 - 150
BAHAN Wire Mesh 5,4 x 2,1 Type M8 - 150 1.1000 Lbr 850,500.00 Kawat Ikat Beton 0.2500 Lbr 45,000.00
TENAGA Pekerja 0.1342 Oh 108,000.00 Tukang Besi 0.0070 Oh 118,000.00 Kepala Tukang 0.0070 Oh 138,000.00 Mandor 0.0178 Oh 150,000.00
Jumlah
18 1 M2 PEKERJAAN BEKISTING PLAT LANTAI
BAHAN Paku 2" - 5" 0.0400 Kg 25,000.00 Minyak Bekisting 0.2000 Ltr 25,000.00 Kayu 0.0144 M3 2,750,000.00 Plywood tebal 9 mm 0.3500 Lbr 140,000.00 Kayu Dolken 6.0000 Btg 30,000.00
TENAGA Pekerja 0.3200 Oh 108,000.00 Tukang Kayu 0.3300 Oh 118,000.00 Kepala Tukang 0.0330 Oh 138,000.00 Mandor 0.0060 Oh 150,000.00
Jumlah
19 1 M3 BETON COR 1:2:3
BAHAN Kerikil 0.8200 M3 575,000.00 Pasir Beton 0.5400 M3 465,000.00 Semen Porltand 340.0000 Kg 1,700.00
TENAGA Pekerja 1.6500 Oh 108,000.00 Tukang Batu 0.2500 Oh 118,000.00 Kepala Tukang 0.0250 Oh 138,000.00 Mandor 0.0800 Oh 150,000.00
Jumlah
20 1 M3 BETON COR K-250
No. Jenis Pekerjaan (Rp)
Indeks dan Satuan
Harga Bahan dan Upah
BAHAN Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 352.5000 Kg 1,700.00
TENAGA Pekerja 1.6500 Oh 108,000.00 Tukang Batu 0.2500 Oh 118,000.00 Kepala Tukang 0.0250 Oh 138,000.00 Mandor 0.0800 Oh 150,000.00
Jumlah
No. Jenis Pekerjaan (Rp)
Indeks dan Satuan
Harga Bahan dan Upah
21 1 M3 MEMBUAT PONDASI BETON BERTULANG + BEKISTING
BAHAN Kayu Terentang 0.2000 M3 2,750,000.00 Paku Biasa 2" - 5" 1.5000 Kg 25,000.00 Minyak Bekisting 0.4000 Ltr 25,000.00 Besi Beton Ulir 202.7274 Kg 16,500.00 Kawat Beton 3.0000 Kg 45,000.00 Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 352.5000 Kg 1,700.00
TENAGA Pekerja 3.9000 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 1.0400 Oh 118,000.00 Tukang Besi 1.0500 Oh 118,000.00 Kepala Tukang 0.2450 Oh 138,000.00 Mandor 0.1650 Oh 150,000.00
Jumlah
22 1 M3 MEMBUAT SLOOF 30 x 60 CM BETON BERTULANG K 225 + BEKISTING
BAHAN Kayu Terentang 0.1875 M3 2,750,000.00 Paku Biasa 2" - 5" 2.0000 Kg 25,000.00 Minyak Bekisting 0.6000 Ltr 25,000.00 Besi Beton 156.5977 Kg 16,500.00 Kawat Beton 3.0000 Kg 45,000.00 Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 352.5000 Kg 1,700.00
TENAGA Pekerja 4.8500 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 1.5600 Oh 118,000.00 Tukang Besi 1.4000 Oh 118,000.00 Kepala Tukang 0.3310 Oh 138,000.00 Mandor 0.1700 Oh 150,000.00
Jumlah
23 1 M3 MEMBUAT SLOOF 25 x 45 CM BETON BERTULANG + BEKISTING
BAHAN Kayu Terentang 0.1875 M3 2,750,000.00 Paku Biasa 2" - 5" 2.0000 Kg 25,000.00 Minyak Bekisting 0.6000 Ltr 25,000.00 Besi Beton 190.1593 Kg 16,500.00 Kawat Beton 2.8524 Kg 45,000.00 Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 352.5000 Kg 1,700.00
TENAGA Pekerja 4.8500 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 1.5600 Oh 118,000.00 Tukang Besi 1.4000 Oh 118,000.00
No. Jenis Pekerjaan (Rp)
Indeks dan Satuan
Harga Bahan dan Upah
Kepala Tukang 0.3310 Oh 138,000.00 Mandor 0.1700 Oh 150,000.00
Jumlah
No. Jenis Pekerjaan (Rp)
Indeks dan Satuan
Harga Bahan dan Upah
24 1 M3 MEMBUAT SLOOF 25 x 40 CM BETON BERTULANG + BEKISTING
BAHAN Kayu Terentang 0.1875 M3 2,750,000.00 Paku Biasa 2" - 5" 2.0000 Kg 25,000.00 Minyak Bekisting 0.6000 Ltr 25,000.00 Besi Beton 198.3391 Kg 16,500.00 Kawat Beton 2.9751 Kg 45,000.00 Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 352.5000 Kg 1,700.00
TENAGA Pekerja 4.8500 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 1.5600 Oh 118,000.00 Tukang Besi 1.4000 Oh 118,000.00 Kepala Tukang 0.3310 Oh 138,000.00 Mandor 0.1700 Oh 150,000.00
Jumlah
25 1 M3 MEMBUAT SLOOF 20 x 30 CM BETON BERTULANG + BEKISTING
BAHAN Kayu Terentang 0.1875 M3 2,750,000.00 Paku Biasa 2" - 5" 2.0000 Kg 25,000.00 Minyak Bekisting 0.6000 Ltr 25,000.00 Besi Beton 199.6569 Kg 16,500.00 Kawat Beton 2.9949 Kg 45,000.00 Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 352.5000 Kg 1,700.00
TENAGA Pekerja 4.8500 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 1.5600 Oh 118,000.00 Tukang Besi 1.4000 Oh 118,000.00 Kepala Tukang 0.3310 Oh 138,000.00 Mandor 0.1700 Oh 150,000.00
Jumlah
26 1 M3 MEMBUAT SLOOF 15 x 20 CM BETON BERTULANG + BEKISTING
BAHAN Kayu Terentang 0.1875 M3 2,750,000.00 Paku Biasa 2" - 5" 2.0000 Kg 25,000.00 Minyak Bekisting 0.6000 Ltr 25,000.00 Besi Beton 192.2622 Kg 16,500.00 Kawat Beton 2.8839 Kg 45,000.00 Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 352.5000 Kg 1,700.00
TENAGA Pekerja 4.8500 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 1.5600 Oh 118,000.00 Tukang Besi 1.4000 Oh 118,000.00
No. Jenis Pekerjaan (Rp)
Indeks dan Satuan
Harga Bahan dan Upah
Kepala Tukang 0.3310 Oh 138,000.00 Mandor 0.1700 Oh 150,000.00
Jumlah
No. Jenis Pekerjaan (Rp)
Indeks dan Satuan
Harga Bahan dan Upah
27 1 M3 MEMBUAT KOLOM 40 x 40 CM BETON BERTULANG K 250 + BEKISTING
BAHAN Kayu Terentang 0.0393 M3 2,750,000.00 Paku Biasa 2" - 5" 4.0000 Kg 25,000.00 Minyak Bekisting 0.6000 Ltr 25,000.00 Besi Beton 195.9389 Kg 16,500.00 Kawat Beton 3.0000 Kg 45,000.00 Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 352.5000 Kg 1,700.00
TENAGA Pekerja 7.3000 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 3.3000 Oh 118,000.00 Tukang Besi 2.1000 Oh 118,000.00 Kepala Tukang 0.5700 Oh 138,000.00 Mandor 0.1800 Oh 150,000.00
Jumlah
28 1 M3 MEMBUAT KOLOM 35 x 35 CM BETON BERTULANG + BEKISTING
BAHAN Kayu Terentang 0.1667 M3 2,750,000.00 Paku Biasa 2" - 5" 4.0000 Kg 25,000.00 Minyak Bekisting 0.6000 Ltr 25,000.00 Besi Beton 195.9389 Kg 16,500.00 Kawat Beton 3.0000 Kg 45,000.00 Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 352.5000 Kg 1,700.00
TENAGA Pekerja 7.3000 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 3.3000 Oh 118,000.00 Tukang Besi 2.1000 Oh 118,000.00 Kepala Tukang 0.5700 Oh 138,000.00 Mandor 0.1800 Oh 150,000.00
Jumlah
29 1 M3 MEMBUAT KOLOM PEDESTEL 30 x 30 CM BETON BERTULANG + BEKISTING
BAHAN Kayu Terentang 0.4000 M3 2,750,000.00 Paku Biasa 2" - 5" 4.0000 Kg 25,000.00 Minyak Bekisting 0.6000 Ltr 25,000.00 Besi Beton 140.0000 Kg 16,500.00 Kawat Beton 2.1000 Kg 45,000.00 Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 352.5000 Kg 1,700.00
TENAGA Pekerja 7.3000 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 3.3000 Oh 118,000.00 Tukang Besi 2.1000 Oh 118,000.00
No. Jenis Pekerjaan (Rp)
Indeks dan Satuan
Harga Bahan dan Upah
Kepala Tukang 0.5700 Oh 138,000.00 Mandor 0.1800 Oh 150,000.00
Jumlah
No. Jenis Pekerjaan (Rp)
Indeks dan Satuan
Harga Bahan dan Upah
30 1 M3 MEMBUAT KOLOM 25 x 25 CM BETON BERTULANG + BEKISTING
BAHAN Kayu Terentang 0.3333 M3 2,750,000.00 Paku Biasa 2" - 5" 4.0000 Kg 25,000.00 Minyak Bekisting 0.6000 Ltr 25,000.00 Besi Beton 208.0000 Kg 16,500.00 Kawat Beton 3.1200 Kg 45,000.00 Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 352.5000 Kg 1,700.00
TENAGA Pekerja 7.3000 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 3.3000 Oh 118,000.00 Tukang Besi 2.1000 Oh 118,000.00 Kepala Tukang 0.5700 Oh 138,000.00 Mandor 0.1800 Oh 150,000.00
Jumlah
31 1 M3 MEMBUAT KOLOM 20 x 20 CM BETON BERTULANG + BEKISTING
BAHAN Kayu Terentang 0.6666 M3 2,750,000.00 Paku Biasa 2" - 5" 4.0000 Kg 25,000.00 Minyak Bekisting 0.6000 Ltr 25,000.00 Besi Beton 244.0000 Kg 16,500.00 Kawat Beton 3.6600 Kg 45,000.00 Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 352.5000 Kg 1,700.00
TENAGA Pekerja 7.3000 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 3.3000 Oh 118,000.00 Tukang Besi 2.1000 Oh 118,000.00 Kepala Tukang 0.5700 Oh 138,000.00 Mandor 0.1800 Oh 150,000.00
Jumlah
32 1 M3 MEMBUAT KOLOM 11 x 15 CM BETON BERTULANG + BEKISTING
BAHAN Kayu Terentang 0.6666 M3 2,750,000.00 Paku Biasa 2" - 5" 4.0000 Kg 25,000.00 Minyak Bekisting 0.6000 Ltr 25,000.00 Besi Beton 115.0000 Kg 16,500.00 Kawat Beton 1.7250 Kg 45,000.00 Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 275.0000 Kg 1,700.00
TENAGA Pekerja 7.3000 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 3.3000 Oh 118,000.00 Tukang Besi 2.1000 Oh 118,000.00
No. Jenis Pekerjaan (Rp)
Indeks dan Satuan
Harga Bahan dan Upah
Kepala Tukang 0.5700 Oh 138,000.00 Mandor 0.1800 Oh 150,000.00
Jumlah
No. Jenis Pekerjaan (Rp)
Indeks dan Satuan
Harga Bahan dan Upah
33 1 M3 MEMBUAT KOLOM Ø 40 CM BETON BERTULANG + BEKISTING
BAHAN Kayu Terentang 0.6666 M3 2,750,000.00 Paku Biasa 2" - 5" 4.0000 Kg 25,000.00 Minyak Bekisting 0.6000 Ltr 25,000.00 Besi Beton 181.0000 Kg 16,500.00 Kawat Beton 2.7150 Kg 45,000.00 Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 352.5000 Kg 1,700.00
TENAGA Pekerja 7.3000 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 3.3000 Oh 118,000.00 Tukang Besi 2.1000 Oh 118,000.00 Kepala Tukang 0.5700 Oh 138,000.00 Mandor 0.1800 Oh 150,000.00
Jumlah
34 1 M3 MEMBUAT KOLOM Ø 35 CM BETON BERTULANG + BEKISTING
BAHAN Kayu Terentang 0.6666 M3 2,750,000.00 Paku Biasa 2" - 5" 4.0000 Kg 25,000.00 Minyak Bekisting 0.6000 Ltr 25,000.00 Besi Beton 231.0000 Kg 16,500.00 Kawat Beton 3.4650 Kg 45,000.00 Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 352.5000 Kg 1,700.00
TENAGA Pekerja 7.3000 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 3.3000 Oh 118,000.00 Tukang Besi 2.1000 Oh 118,000.00 Kepala Tukang 0.5700 Oh 138,000.00 Mandor 0.1800 Oh 150,000.00
Jumlah
35 1 M3 MEMBUAT KOLOM Ø 30 CM BETON BERTULANG + BEKISTING
BAHAN Kayu Terentang 0.6666 M3 2,750,000.00 Paku Biasa 2" - 5" 4.0000 Kg 25,000.00 Minyak Bekisting 0.6000 Ltr 25,000.00 Besi Beton 227.0000 Kg 16,500.00 Kawat Beton 3.4050 Kg 45,000.00 Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 352.5000 Kg 1,700.00
TENAGA Pekerja 7.3000 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 3.3000 Oh 118,000.00 Tukang Besi 2.1000 Oh 118,000.00
No. Jenis Pekerjaan (Rp)
Indeks dan Satuan
Harga Bahan dan Upah
Kepala Tukang 0.5700 Oh 138,000.00 Mandor 0.1800 Oh 150,000.00
Jumlah
No. Jenis Pekerjaan (Rp)
Indeks dan Satuan
Harga Bahan dan Upah
36 1 M3 MEMBUAT KOLOM Ø 20 CM BETON BERTULANG + BEKISTING
BAHAN Kayu Terentang 0.6666 M3 2,750,000.00 Paku Biasa 2" - 5" 4.0000 Kg 25,000.00 Minyak Bekisting 0.6000 Ltr 25,000.00 Besi Beton 292.0000 Kg 16,500.00 Kawat Beton 4.3800 Kg 45,000.00 Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 352.5000 Kg 1,700.00
TENAGA Pekerja 7.3000 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 3.3000 Oh 118,000.00 Tukang Besi 2.1000 Oh 118,000.00 Kepala Tukang 0.5700 Oh 138,000.00 Mandor 0.1800 Oh 150,000.00
Jumlah
37 1 M3 MEMBUAT BALOK 30 x 60 CM BETON BERTULANG + BEKISTING
BAHAN Kayu Terentang 0.1785 M3 2,750,000.00 Paku Biasa 2" - 5" 3.2000 Kg 25,000.00 Minyak Bekisting 1.6000 Ltr 25,000.00 Besi Beton 166.7323 Kg 16,500.00 Kawat Beton 2.5010 Kg 45,000.00 Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 352.5000 Kg 1,700.00
TENAGA Pekerja 7.3000 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 3.3000 Oh 118,000.00 Tukang Besi 2.1000 Oh 118,000.00 Kepala Tukang 0.5700 Oh 138,000.00 Mandor 0.1800 Oh 150,000.00
Jumlah
38 1 M3 MEMBUAT BALOK 1, 25 x 45 CM BETON BERTULANG + BEKISTING
BAHAN Kayu Terentang 0.1785 M3 2,750,000.00 Paku Biasa 2" - 5" 3.2000 Kg 25,000.00 Minyak Bekisting 1.6000 Ltr 25,000.00 Besi Beton 169.7098 Kg 16,500.00 Kawat Beton 2.5458 Kg 45,000.00 Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 352.5000 Kg 1,700.00
TENAGA Pekerja 7.3000 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 3.3000 Oh 118,000.00 Tukang Besi 2.1000 Oh 118,000.00
No. Jenis Pekerjaan (Rp)
Indeks dan Satuan
Harga Bahan dan Upah
Kepala Tukang 0.5700 Oh 138,000.00 Mandor 0.1800 Oh 150,000.00
Jumlah
No. Jenis Pekerjaan (Rp)
Indeks dan Satuan
Harga Bahan dan Upah
39 1 M3 MEMBUAT BALOK 2, 25 x 45 CM BETON BERTULANG + BEKISTING
BAHAN Kayu Terentang 0.1785 M3 2,750,000.00 Paku Biasa 2" - 5" 3.2000 Kg 25,000.00 Minyak Bekisting 1.6000 Ltr 25,000.00 Besi Beton 164.6160 Kg 16,500.00 Kawat Beton 2.4692 Kg 45,000.00 Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 352.5000 Kg 1,700.00
TENAGA Pekerja 7.3000 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 3.3000 Oh 118,000.00 Tukang Besi 2.1000 Oh 118,000.00 Kepala Tukang 0.5700 Oh 138,000.00 Mandor 0.1800 Oh 150,000.00
Jumlah
40 1 M3 MEMBUAT BALOK 25 x 40 CM BETON BERTULANG + BEKISTING
BAHAN Kayu Terentang 0.1785 M3 2,750,000.00 Paku Biasa 2" - 5" 3.2000 Kg 25,000.00 Minyak Bekisting 1.6000 Ltr 25,000.00 Besi Beton 197.4966 Kg 16,500.00 Kawat Beton 3.3857 Kg 45,000.00 Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 352.5000 Kg 1,700.00
TENAGA Pekerja 7.3000 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 3.3000 Oh 118,000.00 Tukang Besi 2.1000 Oh 118,000.00 Kepala Tukang 0.5700 Oh 138,000.00 Mandor 0.1800 Oh 150,000.00
Jumlah
41 1 M3 MEMBUAT BALOK 20 x 60 CM BETON BERTULANG + BEKISTING
BAHAN Kayu Terentang 0.1785 M3 2,750,000.00 Paku Biasa 2" - 5" 3.2000 Kg 25,000.00 Minyak Bekisting 1.6000 Ltr 25,000.00 Besi Beton 169.0000 Kg 16,500.00 Kawat Beton 2.5350 Kg 45,000.00 Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 352.5000 Kg 1,700.00
TENAGA Pekerja 7.3000 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 3.3000 Oh 118,000.00 Tukang Besi 2.1000 Oh 118,000.00
No. Jenis Pekerjaan (Rp)
Indeks dan Satuan
Harga Bahan dan Upah
Kepala Tukang 0.5700 Oh 138,000.00 Mandor 0.1800 Oh 150,000.00
Jumlah
No. Jenis Pekerjaan (Rp)
Indeks dan Satuan
Harga Bahan dan Upah
42 1 M3 MEMBUAT BALOK 20 x 40 CM BETON BERTULANG + BEKISTING
BAHAN Kayu Terentang 0.1785 M3 2,750,000.00 Paku Biasa 2" - 5" 3.2000 Kg 25,000.00 Minyak Bekisting 1.6000 Ltr 25,000.00 Besi Beton 187.0000 Kg 16,500.00 Kawat Beton 2.8050 Kg 45,000.00 Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 352.5000 Kg 1,700.00
TENAGA Pekerja 7.3000 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 3.3000 Oh 118,000.00 Tukang Besi 2.1000 Oh 118,000.00 Kepala Tukang 0.5700 Oh 138,000.00 Mandor 0.1800 Oh 150,000.00
Jumlah
43 1 M3 MEMBUAT BALOK 20 x 35 CM BETON BERTULANG + BEKISTING
BAHAN Kayu Terentang 0.1785 M3 2,750,000.00 Paku Biasa 2" - 5" 3.2000 Kg 25,000.00 Minyak Bekisting 1.6000 Ltr 25,000.00 Besi Beton 152.2692 Kg 16,500.00 Kawat Beton 2.8500 Kg 45,000.00 Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 352.5000 Kg 1,700.00
TENAGA Pekerja 7.3000 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 3.3000 Oh 118,000.00 Tukang Besi 2.1000 Oh 118,000.00 Kepala Tukang 0.5700 Oh 138,000.00 Mandor 0.1800 Oh 150,000.00
Jumlah
44 1 M3 MEMBUAT BALOK 20 x 30 CM BETON BERTULANG + BEKISTING
BAHAN Kayu Terentang 0.1785 M3 2,750,000.00 Paku Biasa 2" - 5" 3.2000 Kg 25,000.00 Minyak Bekisting 1.6000 Ltr 25,000.00 Besi Beton 113.8784 Kg 16,500.00 Kawat Beton 1.7082 Kg 45,000.00 Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 352.5000 Kg 1,700.00
TENAGA Pekerja 7.3000 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 3.3000 Oh 118,000.00 Tukang Besi 2.1000 Oh 118,000.00
No. Jenis Pekerjaan (Rp)
Indeks dan Satuan
Harga Bahan dan Upah
Kepala Tukang 0.5700 Oh 138,000.00 Mandor 0.1800 Oh 150,000.00
Jumlah
No. Jenis Pekerjaan (Rp)
Indeks dan Satuan
Harga Bahan dan Upah
45 1 M3 MEMBUAT BALOK 15 x 20 CM BETON BERTULANG + BEKISTING
BAHAN Kayu Terentang 0.1785 M3 2,750,000.00 Paku Biasa 2" - 5" 3.2000 Kg 25,000.00 Minyak Bekisting 1.6000 Ltr 25,000.00 Besi Beton 172.0000 Kg 16,500.00 Kawat Beton 2.5800 Kg 45,000.00 Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 352.5000 Kg 1,700.00
TENAGA Pekerja 7.3000 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 3.3000 Oh 118,000.00 Tukang Besi 2.1000 Oh 118,000.00 Kepala Tukang 0.5700 Oh 138,000.00 Mandor 0.1800 Oh 150,000.00
Jumlah
46 1 M3 MEMBUAT TANGGA BETON BERTULANG (170 Kg + BEKISTING )
BAHAN Kayu Terentang 0.2500 M3 2,750,000.00 Paku Biasa 2" - 5" 3.0000 Kg 25,000.00 Minyak Bekisting 1.2000 Ltr 25,000.00 Besi Beton 170.0000 Kg 16,500.00 Kawat Beton 3.0000 Kg 45,000.00 Kerikil 0.7800 M3 575,000.00 Pasir Beton 0.5200 M3 465,000.00 Semen Porltand 323.0000 Kg 1,700.00 Plywood 9 mm 2.5000 Lbr 140,000.00 Dolken Ø 8 / 4 m 14.0000 Btg 30,000.00
TENAGA Pekerja 5.6000 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 2.3000 Oh 118,000.00 Tukang Besi 1.4000 Oh 118,000.00 Kepala Tukang 0.4050 Oh 138,000.00 Mandor 0.2020 Oh 150,000.00
Jumlah
47 1 M3 MEMBUAT PLAT DAAG BETON BERTULANG + BEKISTING
Beton 1.0000 M3 1,337,750.00 Besi Tulangan 120.4534 Kg 18,373.00 Bekisting 8.3000 M2 353,554.00
Jumlah
48 1 M3 MEMBUAT PLAT CANOPY BETON BERTULANG + BEKISTING
Beton 1.0000 M3 1,337,750.00 Besi Tulangan 196.7890 Kg 18,373.00 Bekisting 7.6820 M2 83,085.40
Jumlah
No. Jenis Pekerjaan (Rp)
Indeks dan Satuan
Harga Bahan dan Upah
49 1 M' SALURAN KELILING PAS. BATA 1/2 BATU
Pas. Bata 1/2 Batu 1 : 4 0.5000 M2 149,570.00 Plesteran 1 : 2 1.0000 M2 80,300.80 Cor Beton 1 : 3 : 5 0.0225 M3 1,335,800.00 Besi Gril Ø 19 mm + Besi Siku 1.0000 M' 115,000.00
Jumlah
No. Jenis Pekerjaan (Rp)
Indeks dan Satuan
Harga Bahan dan Upah
50 1 M2 PEKERJAAN BEKISTING LIST PLANK BETON
BAHAN Paku 2" - 5" 0.0400 Kg 25,000.00 Minyak Bekisting 0.2000 Ltr 25,000.00 Kayu 0.0072 M3 2,750,000.00 Plywood tebal 9 mm 0.3470 Lbr 140,000.00
TENAGA Pekerja 0.0320 Oh 108,000.00 Tukang Kayu 0.0330 Oh 118,000.00 Kepala Tukang 0.0033 Oh 138,000.00 Mandor 0.0060 Oh 150,000.00
Jumlah
51 1 M2 PAS. DINDING BATU BATA 1/2 BATU 1 : 4
BAHAN Batu Bata 80.0000 Bh 1,200.00 Semen 0.4500 Kg 1,700.00 Pasir Pasang 0.0450 M3 425,000.00
TENAGA Pekerja 0.0400 Oh 108,000.00 Tukang Batu 0.2000 Oh 118,000.00 Kepala Tukang 0.0200 Oh 138,000.00 Mandor 0.0200 Oh 150,000.00
Jumlah
52 1 M2 PAS. DINDING BATU BATA 1/2 BATU 1 : 2
BAHAN Batu Bata 80.0000 Bh 1,200.00 Semen 0.5000 Kg 1,700.00 Pasir Pasang 0.0500 M3 425,000.00
TENAGA Pekerja 0.0400 Oh 108,000.00 Tukang Batu 0.2000 Oh 118,000.00 Kepala Tukang 0.0200 Oh 138,000.00 Mandor 0.0200 Oh 150,000.00
Jumlah
53 1 M2 PLESTERAN 1 : 2
BAHAN Semen 10.2240 Kg 1,700.00 Pasir Pasang 0.0200 M3 425,000.00
TENAGA Pekerja 0.3000 Oh 108,000.00 Tukang Batu 0.1500 Oh 118,000.00 Kepala Tukang 0.0150 Oh 138,000.00 Mandor 0.0150 Oh 150,000.00
Jumlah
54 1 M2 PAS. PONDASI BATU BATA 1 BATU 1:4
No. Jenis Pekerjaan (Rp)
Indeks dan Satuan
Harga Bahan dan Upah
BAHAN Batu Bata 140.000 Bh 1,200.00 Semen 26.5500 Kg 1,700.00 Pasir Pasang 0.0930 M3 425,000.00
TENAGA Pekerja 0.6500 Oh 108,000.00 Tukang Batu 0.2000 Oh 118,000.00 Kepala Tukang 0.0200 Oh 138,000.00 Mandor 0.0300 Oh 150,000.00
Jumlah
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
PENINGKATAN SARANA DAN PRASARANA APARATUR
Jumlah Harga
(Rp)
1 M2 MEMBERSIHKAN LOKASI DAN LAPANGAN
1,080.00 750.00
1,830.00
1 M2 PEK. KANTOR DIREKSI KEET, DEGAN LANTAI PLESTERAN
37,500.00 247,500.00 16,250.00 22,000.00 59,500.00 63,750.00 46,500.00 74,750.00 36,000.00 16,250.00 370,000.00 7,600.00 16,500.00 5,700.00
236,000.00 118,000.00 216,000.00 41,400.00 7,500.00
1,638,700.00
1 M2 PEMBUATAN BEDENG BURUH
37,500.00 511,500.00 7,500.00 30,600.00 13,950.00 28,750.00 22,000.00 128,250.00
LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS
Jumlah Harga
(Rp)
236,000.00 108,000.00 27,600.00 7,500.00
1,159,150.00
1 M2 PENGUPASAN HUMUS TANAH
15,120.00 1,050.00
16,170.00
Jumlah Harga
(Rp)
1 M2 PENGUKURAN DAN PEMASANGAN BOWPLANK
2,640.00 500.00 1,260.00
11,800.00 10,800.00 1,380.00 750.00
29,130.00
1 M3 GALIAN TANAH SEDALAM 1 M
43,200.00 6,000.00
49,200.00
1 M3 URUGAN KEMBALI
20,736.00 6,000.00
26,736.00
1 M3 PEMADATAN ( PAKAI ALAT )
54,000.00 6,000.00
7,500.00
67,500.00
1 M3 URUGAN TANAH BIASA
198,000.00
35,640.00 1,500.00
235,140.00
1 M3 URUGAN TANAH PILIHAN
420,000.00
32,400.00 1,500.00
Jumlah Harga
(Rp)
9,968.00 88,126.50 4,850.00 1,946.00 5,000.00
563,790.50
Jumlah Harga
(Rp)
1 M3 TIMBUNAN PASIR URUG
498,000.00
32,400.00 1,500.00
531,900.00
1 M3 TIMBUNAN AGREGRAT KELAS A
1,020,000.00
6,750.00 1,335.00
4,984.00 10,934.00 5,674.50 5,949.20 5,000.00
1,060,626.70
1 M3 URUGAN / RABAT KERIKIL
690,000.00
32,400.00 1,500.00
723,900.00
1 M2 PEMADATAN ( PAKAI ALAT )
54,000.00 6,000.00
7,500.00
67,500.00
1 M3 BETON COR 1:3:5
500,250.00 241,800.00 370,600.00
178,200.00 29,500.00 3,450.00
Jumlah Harga
(Rp)
12,000.00
1,335,800.00
Jumlah Harga
(Rp)
14,700.00 675.00
756.00 826.00 966.00 450.00
18,373.00
935,550.00 11,250.00
14,493.60 826.00 966.00 2,670.00
965,755.60
1,000.00 5,000.00 39,600.00 49,000.00 180,000.00
34,560.00 38,940.00 4,554.00 900.00
353,554.00
1 M3 BETON COR 1:2:3
471,500.00 251,100.00 578,000.00
178,200.00 29,500.00 3,450.00 12,000.00
1,523,750.00
1 M3 BETON COR K-250
Jumlah Harga
(Rp)
287,500.00 227,850.00 599,250.00
178,200.00 29,500.00 3,450.00 12,000.00
1,337,750.00
Jumlah Harga
(Rp)
1 M3 MEMBUAT PONDASI BETON BERTULANG + BEKISTING
550,000.00 37,500.00 10,000.00 3,345,002.10 135,000.00 287,500.00 227,850.00 599,250.00
421,200.00 41,300.00 122,720.00 123,900.00 33,810.00 24,750.00
5,959,782.10
1 M3 MEMBUAT SLOOF 30 x 60 CM BETON BERTULANG K 225 + BEKISTING
515,625.00 50,000.00 15,000.00 2,583,862.05 135,000.00 287,500.00 227,850.00 599,250.00
523,800.00 41,300.00 184,080.00 165,200.00 45,678.00 25,500.00
5,399,645.05
1 M3 MEMBUAT SLOOF 25 x 45 CM BETON BERTULANG + BEKISTING
515,625.00 50,000.00 15,000.00 3,137,628.45 128,358.00 287,500.00 227,850.00 599,250.00
523,800.00 41,300.00 184,080.00 165,200.00
Jumlah Harga
(Rp)
45,678.00 25,500.00
5,946,769.45
Jumlah Harga
(Rp)
1 M3 MEMBUAT SLOOF 25 x 40 CM BETON BERTULANG + BEKISTING
515,625.00 50,000.00 15,000.00 3,272,595.15 133,879.50 287,500.00 227,850.00 599,250.00
523,800.00 41,300.00 184,080.00 165,200.00 45,678.00 25,500.00
6,087,257.65
1 M3 MEMBUAT SLOOF 20 x 30 CM BETON BERTULANG + BEKISTING
515,625.00 50,000.00 15,000.00 3,294,338.85 134,770.50 287,500.00 227,850.00 599,250.00
523,800.00 41,300.00 184,080.00 165,200.00 45,678.00 25,500.00
6,109,892.35
1 M3 MEMBUAT SLOOF 15 x 20 CM BETON BERTULANG + BEKISTING
515,625.00 50,000.00 15,000.00 3,172,326.30 129,775.50 287,500.00 227,850.00 599,250.00
523,800.00 41,300.00 184,080.00 165,200.00
Jumlah Harga
(Rp)
45,678.00 25,500.00
5,982,884.80
Jumlah Harga
(Rp)
1 M3 MEMBUAT KOLOM 40 x 40 CM BETON BERTULANG K 250 + BEKISTING
108,075.00 100,000.00 15,000.00 3,232,991.85 135,000.00 287,500.00 227,850.00 599,250.00
788,400.00 41,300.00 389,400.00 247,800.00 78,660.00 27,000.00
6,278,226.85
1 M3 MEMBUAT KOLOM 35 x 35 CM BETON BERTULANG + BEKISTING
458,425.00 100,000.00 15,000.00 3,232,991.85 135,000.00 287,500.00 227,850.00 599,250.00
788,400.00 41,300.00 389,400.00 247,800.00 78,660.00 27,000.00
6,628,576.85
1 M3 MEMBUAT KOLOM PEDESTEL 30 x 30 CM BETON BERTULANG + BEKISTING
1,100,000.00 100,000.00 15,000.00 2,310,000.00 94,500.00 287,500.00 227,850.00 599,250.00
788,400.00 41,300.00 389,400.00 247,800.00
Jumlah Harga
(Rp)
78,660.00 27,000.00
6,306,660.00
Jumlah Harga
(Rp)
1 M3 MEMBUAT KOLOM 25 x 25 CM BETON BERTULANG + BEKISTING
916,575.00 100,000.00 15,000.00 3,432,000.00 140,400.00 287,500.00 227,850.00 599,250.00
788,400.00 41,300.00 389,400.00 247,800.00 78,660.00 27,000.00
7,291,135.00
1 M3 MEMBUAT KOLOM 20 x 20 CM BETON BERTULANG + BEKISTING
1,833,150.00 100,000.00 15,000.00 4,026,000.00 164,700.00 287,500.00 227,850.00 599,250.00
788,400.00 41,300.00 389,400.00 247,800.00 78,660.00 27,000.00
8,826,010.00
1 M3 MEMBUAT KOLOM 11 x 15 CM BETON BERTULANG + BEKISTING
1,833,150.00 100,000.00 15,000.00 1,897,500.00 77,625.00 287,500.00 227,850.00 467,500.00
788,400.00 41,300.00 389,400.00 247,800.00
Jumlah Harga
(Rp)
78,660.00 27,000.00
6,478,685.00
Jumlah Harga
(Rp)
1 M3 MEMBUAT KOLOM Ø 40 CM BETON BERTULANG + BEKISTING
1,833,150.00 100,000.00 15,000.00 2,986,500.00 122,175.00 287,500.00 227,850.00 599,250.00
788,400.00 41,300.00 389,400.00 247,800.00 78,660.00 27,000.00
7,743,985.00
1 M3 MEMBUAT KOLOM Ø 35 CM BETON BERTULANG + BEKISTING
1,833,150.00 100,000.00 15,000.00 3,811,500.00 155,925.00 287,500.00 227,850.00 599,250.00
788,400.00 41,300.00 389,400.00 247,800.00 78,660.00 27,000.00
8,602,735.00
1 M3 MEMBUAT KOLOM Ø 30 CM BETON BERTULANG + BEKISTING
1,833,150.00 100,000.00 15,000.00 3,745,500.00 153,225.00 287,500.00 227,850.00 599,250.00
788,400.00 41,300.00 389,400.00 247,800.00
Jumlah Harga
(Rp)
78,660.00 27,000.00
8,534,035.00
Jumlah Harga
(Rp)
1 M3 MEMBUAT KOLOM Ø 20 CM BETON BERTULANG + BEKISTING
1,833,150.00 100,000.00 15,000.00 4,818,000.00 197,100.00 287,500.00 227,850.00 599,250.00
788,400.00 41,300.00 389,400.00 247,800.00 78,660.00 27,000.00
9,650,410.00
1 M3 MEMBUAT BALOK 30 x 60 CM BETON BERTULANG + BEKISTING
490,875.00 80,000.00 40,000.00 2,751,082.95 112,545.00 287,500.00 227,850.00 599,250.00
788,400.00 41,300.00 389,400.00 247,800.00 78,660.00 27,000.00
6,161,662.95
1 M3 MEMBUAT BALOK 1, 25 x 45 CM BETON BERTULANG + BEKISTING
490,875.00 80,000.00 40,000.00 2,800,211.70 114,561.00 287,500.00 227,850.00 599,250.00
788,400.00 41,300.00 389,400.00 247,800.00
Jumlah Harga
(Rp)
78,660.00 27,000.00
6,212,807.70
Jumlah Harga
(Rp)
1 M3 MEMBUAT BALOK 2, 25 x 45 CM BETON BERTULANG + BEKISTING
490,875.00 80,000.00 40,000.00 2,716,164.00 111,114.00 287,500.00 227,850.00 599,250.00
788,400.00 41,300.00 389,400.00 247,800.00 78,660.00 27,000.00
6,125,313.00
1 M3 MEMBUAT BALOK 25 x 40 CM BETON BERTULANG + BEKISTING
490,875.00 80,000.00 40,000.00 3,258,693.90 152,356.50 287,500.00 227,850.00 599,250.00
788,400.00 41,300.00 389,400.00 247,800.00 78,660.00 27,000.00
6,709,085.40
1 M3 MEMBUAT BALOK 20 x 60 CM BETON BERTULANG + BEKISTING
490,875.00 80,000.00 40,000.00 2,788,500.00 114,075.00 287,500.00 227,850.00 599,250.00
788,400.00 41,300.00 389,400.00 247,800.00
Jumlah Harga
(Rp)
78,660.00 27,000.00
6,200,610.00
Jumlah Harga
(Rp)
1 M3 MEMBUAT BALOK 20 x 40 CM BETON BERTULANG + BEKISTING
490,875.00 80,000.00 40,000.00 3,085,500.00 126,225.00 287,500.00 227,850.00 599,250.00
788,400.00 41,300.00 389,400.00 247,800.00 78,660.00 27,000.00
6,509,760.00
1 M3 MEMBUAT BALOK 20 x 35 CM BETON BERTULANG + BEKISTING
490,875.00 80,000.00 40,000.00 2,512,441.80 128,250.00 287,500.00 227,850.00 599,250.00
788,400.00 41,300.00 389,400.00 247,800.00 78,660.00 27,000.00
5,938,726.80
1 M3 MEMBUAT BALOK 20 x 30 CM BETON BERTULANG + BEKISTING
490,875.00 80,000.00 40,000.00 1,878,993.60 76,869.00 287,500.00 227,850.00 599,250.00
788,400.00 41,300.00 389,400.00 247,800.00
Jumlah Harga
(Rp)
78,660.00 27,000.00
5,253,897.60
Jumlah Harga
(Rp)
1 M3 MEMBUAT BALOK 15 x 20 CM BETON BERTULANG + BEKISTING
490,875.00 80,000.00 40,000.00 2,838,000.00 116,100.00 287,500.00 227,850.00 599,250.00
788,400.00 41,300.00 389,400.00 247,800.00 78,660.00 27,000.00
6,252,135.00
1 M3 MEMBUAT TANGGA BETON BERTULANG (170 Kg + BEKISTING )
687,500.00 75,000.00 30,000.00 2,805,000.00 135,000.00 448,500.00 241,800.00 549,100.00 350,000.00 420,000.00
604,800.00 41,300.00 271,400.00 165,200.00 55,890.00 30,300.00
6,910,790.00
1 M3 MEMBUAT PLAT DAAG BETON BERTULANG + BEKISTING
1,337,750.00 2,213,090.32 2,934,498.20
6,485,338.52
1 M3 MEMBUAT PLAT CANOPY BETON BERTULANG + BEKISTING
1,337,750.00 3,615,604.30 638,262.04
5,591,616.34
Jumlah Harga
(Rp)
1 M' SALURAN KELILING PAS. BATA 1/2 BATU
74,785.00 80,300.80 30,055.50 115,000.00
300,141.30
Jumlah Harga
(Rp)
1 M2 PEKERJAAN BEKISTING LIST PLANK BETON
1,000.00 5,000.00 19,800.00 48,580.00
3,456.00 3,894.00 455.40 900.00
83,085.40
1 M2 PAS. DINDING BATU BATA 1/2 BATU 1 : 4
96,000.00 765.00 19,125.00
4,320.00 23,600.00 2,760.00 3,000.00
149,570.00
1 M2 PAS. DINDING BATU BATA 1/2 BATU 1 : 2
96,000.00 850.00 21,250.00
4,320.00 23,600.00 2,760.00 3,000.00
151,780.00
1 M2 PLESTERAN 1 : 2
17,380.80 8,500.00
32,400.00 17,700.00 2,070.00 2,250.00
80,300.80
1 M2 PAS. PONDASI BATU BATA 1 BATU 1:4
Jumlah Harga
(Rp)
168,000.00 45,135.00 39,525.00
70,200.00 23,600.00 2,760.00 4,500.00
353,720.00
DAFTAR HARGA SATUAN UPAH DAN BAHANKECAMATAN BENGKALIS
TAHUN ANGGARAN 2015
KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATURPEKERJAAN :
NO. PAKET : 5/ULP/POKJA I/DINASPU/V/2015LOKASI : KABUPATEN BENGKALISTAHUN ANGGARAN: 2015
JENIS NO UPAH DAN BAHAN SATUAN
1 2 3 4
A. BAHAN PASANGAN 1 Agregrat Kelas A M32 Agregrat Kelas B M33 Agregrat Kelas C M34 Aspal Kg5 Batu Bata Bh6 Batu Kali M37 Filler Kg8 Kerikil / Koral M39 Material Pilihan ( Sirtu ) M3
10 Pasir Pasang M311 Pasir Beton M312 Pasir Plester M313 Pasir Urug M314 Semen Portland @ 50 Kg Zak15 Semen Portland Kg16 Semen Putih Zak17 Semen Putih Kg18 Teer Kg19 Tiang Pancang 20 x 20 x 6 M'20 Tanah Timbunan M321 Tanah Urug Pilihan M3
B. BAHAN KAYU 1 Balok Kayu Kelas II / Meranti M32 Balok Kayu Kelas I / Punak M33 Btg4 Btg5 Kayu Dolken Btg6 Kayu Bakar M37 Papan 3/4" Lembar8 Papan Bekisting M39 Papan Bekisting M2
10 Papan Bouwplank Lembar11 Plywood 4 mm Lembar12 Plywood 9 mm Lembar13 M'14 Kayu 5/7 M3
LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS
Cerocok Kayu Ø 12 - 15" Pjg. 6 MCerocok Kayu Ø 4 - 6" Pjg. 6 M
Tiang Kayu Ø 15 - 20 cm Pjg. 6 M
C. BANAH BESI, MINYA 1 Baut dan Mur Btg DAN LAIN - LAIN 2 Besi Beton Polos Kg
3 Besi Beton Ulir Kg4 Wire Mesh 5,4 x 2,1 Type M8 Lembar5 Besi Baut Steinless Steel Bh6 Besi Angkur Bh7 Bh8 Oksigen Tbg9 Acetelin Tbg
10 Kawat Las Kg11 M'12 Pipa Baja Ø 2" ( Tebal 1,5 mm ) M'13 Pipa Besi Galvanis Ø 4" ( Tebal 2,3 mm M'14 Pipa Besi galvanis Ø 2,5" ( Tebal 1,5 mm M'15 Pipa Besi Galvanis Ø 2" ( Tebal 1,5 mm ) M'16 Pipa Besi Galvanis Ø 1,5" ( Tebl 1.5 mm M'17 Pipa Besi Ø 1 1/4" (Tebal 1,5 mm ) M'18 Pipa Besi Ø 1" ( Tebal 1 mm ) M'19 Besi Strip Kg20 Mesin Las Jam21 M'22 Kawat Ikat Beton Kg23 Paku Beton Kotak24 Paku Putih/ Jembatan Kg25 Paku Biasa 1-5" Kg26 Paku Biasa Halus kg27 Paku Sekrup kg28 Paku Seng Kg29 Minyak Bensin Ltr30 Minyak Pelumas Olie Ltr31 Minyak Solar Ltr32 Minyak Tanah Ltr33 Minyak Bekisting Ltr34 Plastik Alas M235 Paku Alumunium Kg36 Seng Plat Lembar37 Kaca Polos M238 Jendela Nako Bh39 Seng Gelombang BJLS 32 Lembar40 Kunci Tanam Bh
D. TENAGA KERJA 1 Kepala Tukang Orang / Hari2 Tukang Batu Orang / Hari3 Tukang Kayu Orang / Hari4 Tukang Cat Orang / Hari5 Tukang Besi Orang / Hari6 Mandor Orang / Hari7 Pekerja Orang / Hari
Plat Galvanis Ø 20 cm
Pipa Baja Ø 2,5" ( Tebal 1,5 mm )
Besi Grill Ø 19 mm + Besi Siku
DAFTAR HARGA SATUAN UPAH DAN BAHANKECAMATAN BENGKALIS
TAHUN ANGGARAN 2015
PENINGKATAN SARANA DAN PRASARANA APARATUR
HARGA SATUAN( Rp )
5
850,000.00 720,000.00 680,000.00 17,000.00 1,200.00 450,000.00 2,000.00 575,000.00 525,000.00 425,000.00 465,000.00 415,000.00 415,000.00 85,000.00 1,700.00 65,000.00 1,300.00 17,000.00 280,000.00 165,000.00 350,000.00
2,750,000.00 3,600,000.00 35,000.00 15,000.00 30,000.00 450,000.00 85,000.00 1,800,000.00 6,500.00 65,000.00 95,000.00 140,000.00 35,000.00 2,200,000.00
LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS
5,000.00 14,000.00 16,500.00 850,500.00 8,000.00 15,000.00 2,700,000.00 1,200,000.00 1,200,000.00 75,000.00 275,000.00 165,000.00 450,000.00 280,000.00 170,000.00 130,000.00 97,000.00 85,000.00 20,000.00 157,000.00 115,000.00 45,000.00 35,000.00 26,000.00 25,000.00 25,000.00 30,000.00 25,000.00 12,000.00 35,000.00 15,000.00 13,000.00 25,000.00 7,000.00 45,000.00 65,000.00 95,000.00 185,000.00 110,000.00 110,000.00
138,000.00 118,000.00 118,000.00 118,000.00 118,000.00 150,000.00 108,000.00
TIME SCHEDULE
KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATUR
PEKERJAAN : LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS
NO. PAKET : 5/ULP/POKJA I/DINASPU/V/2015
LOKASI : KABUPATEN BENGKALIS
T. A : 2015
NO. URAIAN PEKERJAANBOBOT
WAKTU PELAKSANAAN 150 HARI
BULAN I BULAN II BULAN III BULAN IV BULAN V
% 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 I II III IV V VI
100%
A. LANTAI I ( SATU ) -
I PEKERJAAN PENDAHULUAN 1.30 1.30
II PEKERJAAN TANAH/ PASIR 0.01 0.01
III PEKERJAAN STRUKTUR 21.46 1.82 5.07 5.99 5.43 0.87 1.87 0.41
B. LANTAI II ( DUA )
I PEKERJAAN STRUKTUR 51.08 5.16 6.46 8.35 8.87 7.37 2.62 2.03 2.16 2.59 2.26 2.74 0.48
C. LANTAI III ( TIGA )
I PEKERJAAN STRUKTUR 26.13 4.02 5.98 6.22 6.08 3.83
0%
Jumlah Rencana 100.00 3.14 5.07 5.99 5.43 5.16 6.46 8.35 8.87 7.37 3.49 3.90 2.57 2.59 4.02 5.98 6.22 6.08 6.10 2.74 0.48
Komulatif Rencana 0.00 3.14 8.21 14.21 19.63 24.79 31.25 39.59 48.47 55.84 59.33 63.23 65.79 68.39 72.41 78.39 84.61 90.69 96.78 99.52 100.0
Jumlah RealisasiKomulatif RealisasiDeviasi
Bengkalis, 18 Mei 2015Penawar,
PT. TIGA PUTRA WIJAYA
SUDIRMAN, STKepala Cabang
MASA PEMELIHARAAN 180 HARI KALENDER SKALA
KURVA
JADWAL WAKTU PELAKSANAAN S/D PHO
KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATURPEKERJAAN : LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALISNO. PAKET : 5/ULP/POKJA I/DINASPU/V/2015LOKASI : KABUPATEN BENGKALIST. A : 2015
NO. URAIAN PEKERJAAN BOBOT WAKTU PELAKSANAAN 150 HARI BULAN I BULAN II BULAN III BULAN IV BULAN V
% 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 I II III IV V VI
A. LANTAI I (SATU) 100%I PEKERJAAN PENDAHULUAN1 Pek. Pembersihan Lokasi 0.06 0.062 Pek. Papan Nama Proyek 0.01 0.013 Pek. Pembuatan Direksi Keet 1.23 1.23
II PEKERJAAN TANAH/ PASIR1 Pek. Galian Tanah Pondasi 0.01 0.01
III PEKERJAAN STRUKTUR1 Pek. Cor Balok Sloof ( 1S4 - 15/20 ) Beton + Tulangan + Bekisting ( K 250 ) 0.13 0.132 Pek. Cor Kolom Teras ( K9 ) Beton K 250 + Tulangan + Bekisting 0.92 0.923 Pek. Cor Kolom Lantai 1 Beton K 250 + Tulangan + Bekisting 16.90 1.69 5.07 5.07 5.074 Pek. Cor Kozen Pintu Utama Beton K 225 + Tulangan + Bekisting 0.35 0.355 Pek. Cor Balok Latey Selasar (B4 - 20/30) Beton K 225 + Tulangan + Bekisting Elv. + 2 1.73 0.87 0.876 Pek. Cor Plat Canopy Selasar T = 10 cm, Beton K 225 + Tulangan + Bekisting 1.00 1.007 Pek. Kepala Tiang Selasar 50/80, T = 10 cm, Beton K 225 + Tulangan + Bekisting 0.41 0.41
B. LANTAI II ( DUA )I PEKERJAAN STRUKTUR1 Pek. Cor Balok Lantai (2B6 30/60) Beton K 225 + Tulangan + Bekisting 0.90 0.30 0.30 0.302 Pek. Cor Balok Lantai ( 2B1 25/45 ) Beton K 225 + Tulangan + Bekisting 7.65 1.53 1.53 1.53 1.53 1.533 Pek. Cor Balok Lantai ( 2B2 25/45 ) Beton K 225 + Tulangan + Bekisting 0.93 0.934 Pek. Cor Balok Lantai ( 2B2 25/40 ) Beton K 225 + Tulangan + Bekisting 5.18 1.29 1.29 1.29 1.295 Pek. Cor Balok Lantai ( 2B4 20/35 ) Beton K 225 + Tulangan + Bekisting 3.66 1.22 1.22 1.226 Pek. Cor Balok Lantai ( 2B5 15/20 ) Beton K 225 + Tulangan + Bekisting 0.67 0.677 Pek. Cor Balok Lantai ( 2B7 - 20/30 ) Beton K 225 + Tulangan + Bekisting 0.57 0.578 Pek. Cor Balok Latey Teras (2B1 25/45) Beton K 225 + Tulangan + Bekisting Elv, +3,3 0.57 0.579 Pek. Cor Ring Balok Teras (3B1 25/45) Beton K 225 + Tulangan + Bekisting Elv, + 6.8 0.57 0.28 0.2810 Pek. Cor List Plank Teras T = 10 cm, Beton K 225 + Tulangan + Bekisting 0.95 0.48 0.4811 Pek. Cor Plat Lantai K 225 + Tulangan + Bekisting 16.65 3.33 3.33 3.33 3.33 3.3312 Pek. Cor Plat Daag Selasar T = 10 cm, Beton K 225 + Tulangan + Bekisting 3.96 1.98 1.9813 Pek. Cor Kolom Lantai 2 Beton K 250 + Tulangan + Bekisting 8.11 2.03 2.03 2.03 2.0314 Pek. Cor Kolom Pedastal 1 Elv + 4.00 s/d Elv + 5.00 Beton K 225 + Tulangan + Bekisti 0.13 0.1315 Pek. Cor Ring Balok (RB3 20/30 ) Beton K 225 + Tulangan + Bekisting Elv. + 5.00 0.59 0.59
C. LANTAI III ( TIGA )I PEKERJAAN STRUKTUR1 Pek. Cor Balok Lantai (3B6 30/60) Beton K 225 + Tulangan + Bekisting 0.90 0.30 0.30 0.302 Pek. Cor Balok Lantai ( 3B1 25/45 ) Beton K 225 + Tulangan + Bekisting 4.76 1.19 1.19 1.19 1.193 Pek. Cor Balok Lantai ( 3B2 25/45 ) Beton K 225 + Tulangan + Bekisting 2.43 0.81 0.81 0.814 Pek. Cor Balok Lantai ( 3B3 25/40 ) Beton K 225 + Tulangan + Bekisting 4.60 1.15 1.15 1.15 1.155 Pek. Cor Balok Lantai ( 3B5 15/20 ) Beton K 225 + Tulangan + Bekisting 0.49 0.25 0.256 Pek. Cor Balok Lantai ( 3B7 20/30 ) Beton K 225 + Tulangan + Bekisting 0.31 0.16 0.167 Pek. Cor Plat Lantai K 225 + Tulangan + Bekisting 12.64 2.53 2.53 2.53 2.53 2.53
D. Pre Hand Over ( P H O ) 0.00 0%
Jumlah Rencana 100.00 3.14 5.07 5.99 5.43 5.16 6.46 8.35 8.87 7.37 3.49 3.90 2.57 2.59 4.02 5.98 6.22 6.08 6.10 2.74 0.48
Komulatif Rencana 0 3.14 8.21 14.21 19.63 24.79 31.25 39.59 48.47 55.84 59.33 63.23 65.79 68.39 72.41 78.39 84.61 90.69 96.78 99.52 100.00
Jumlah RealisasiKomulatif RealisasiDeviasi
Bengkalis, 18 Mei 2015Penawar,
PT. TIGA PUTRA WIJAYA
SUDIRMAN, STKepala Cabang
MASA PEMELIHARAAN 180 HARI KALENDER SKALA
KURVA
LAMPIRAN BERITA ACARA RAPAT PEMBAHASAN ADDENDUM TAMBAH KURANG PEKERJAAN
KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATUR
PEKERJAAN : LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS
LOKASI : KABUPATEN BENGKALIS
TAHUN ANGGARAN: 2015
NO. URAIAN PEKERJAAN
KONTRAK AWAL KONTRAK ADDENDUM
SATUAN VOLUME
HARGA JUMLAH
SATUAN VOLUMESATUAN HARGA
( Rp ) ( Rp )
1 2 3 4 5 6 7 8
A. LANTAI I (SATU)
I PEKERJAAN PENDAHULUAN
1 Pek. Pembersihan Lokasi M2 826.97 1,830.00 1,513,355.10 M2 826.97
2 Pek. Papan Nama Proyek Ls 1.00 350,000.00 350,000.00 Ls 1.00
3 Pek. Pembuatan Direksi Keet M2 20.00 ### 32,774,000.00 M2 20.00
II PEKERJAAN TANAH/ PASIR
1 Pek. Galian Tanah Pondasi M3 8.07 49,200.00 397,044.00 M3 8.07
2 Pek. Urugan Tanah Pilihan Bawah Lantai M3 - - - M3 675.92
3 Pek. Urugan Pasir Bawah Lantai M3 - - - M3 59.25
4 Pek. Cor Lantai Beton Camp. 1 : 3 : 5 M3 - - - M3 118.49
5 Pek. Pasangan Wire Mesh M6-150 M2 - - - M2 ###
6 Pek. Urugan Tanah Pilihan Bawah Rabat Beton M3 - - - M3 80.84
7 Pek. Urugan Pasir Bawah Rabat Beton M3 - - - M3 13.47
8 Pek. Cor Rabat Beton Camp. 1 : 3 : 5 M3 - - - M3 21.56
9 Pek. Cor Saluran Keliling Bangunan M3 - - - M3 16.71
III PEKERJAAN STRUKTUR
1 Pek. Cor Balok Sloof ( 1S4 - 15/20 ) Beton + Tulangan + Bekisting ( K 250 ) M3 0.59 ### 3,529,902.03 M3 1.31
2 Pek. Cor Lantai Kerja Beton Camp. 1:3:5 M3 - - - M3 4.37
3 Pek. Cor Balok Sloof ( 1S2 - 25/40 ) Beton + Tulangan + Bekisting ( K 250 ) M3 - - - M3 1.09
NO. URAIAN PEKERJAAN
KONTRAK AWAL KONTRAK ADDENDUM
SATUAN VOLUME
HARGA JUMLAH
SATUAN VOLUMESATUAN HARGA
( Rp ) ( Rp )
1 2 3 4 5 6 7 8
4 Pek. Cor Balok Sloof ( 1S3 - 20/30 ) Beton + Tulangan + Bekisting ( K 250 ) M3 - - - M3 4.29
5 Pek. Cor Kolom Teras ( K9 ) Beton K 250 + Tulangan + Bekisting M3 3.91 ### 24,547,866.98 M3 3.91
6 Pek. Cor Kolom Lantai 1 Beton K 250 + Tulangan + Bekisting M3 71.59 ### 449,458,260.19 M3 71.59
7 Pek. Cor Kozen Pintu Utama Beton K 225 + Tulangan + Bekisting M3 1.50 ### 9,417,340.28 M3 1.50
8 Pek. Cor Balok Latey Selasar (B4 - 20/30) Beton K 225 + Tulangan + Bekisting M3 8.78 ### 46,129,220.93 M3 8.78
9 Pek. Cor Plat Canopy Selasar T = 10 cm, Beton K 225 + Tulangan + Bekisting M3 4.77 ### 26,672,009.94 M3 4.77
10 Pek. Kepala Tiang Selasar 50/80, T = 10 cm, Beton K 225 + Tulangan + Bekisti M3 1.64 ### 11,002,900.06 M3 1.64
SUB TOTAL PEKERJAAN A. LANTAI I (SATU) 605,791,899.51
B. LANTAI II ( DUA )
I PEKERJAAN STRUKTUR
1 Pek. Cor Balok Lantai (2B6 30/60) Beton K 225 + Tulangan + Bekisting M3 3.89 ### 23,968,868.88 M3 3.89
2 Pek. Cor Balok Lantai ( 2B1 25/45 ) Beton K 225 + Tulangan + Bekisting M3 32.74 ### 203,407,324.10 M3 32.74
3 Pek. Cor Balok Lantai ( 2B2 25/45 ) Beton K 225 + Tulangan + Bekisting M3 4.05 ### 24,807,517.65 M3 4.05
4 Pek. Cor Balok Lantai ( 2B2 25/40 ) Beton K 225 + Tulangan + Bekisting M3 20.52 ### 137,670,432.41 M3 20.52
5 Pek. Cor Balok Lantai ( 2B4 20/35 ) Beton K 225 + Tulangan + Bekisting M3 16.38 ### 97,276,344.98 M3 16.38
6 Pek. Cor Balok Lantai ( 2B5 15/20 ) Beton K 225 + Tulangan + Bekisting M3 2.86 ### 17,881,106.10 M3 2.86
7 Pek. Cor Balok Lantai ( 2B7 - 20/30 ) Beton K 225 + Tulangan + Bekisting M3 2.86 ### 15,026,147.14 M3 2.86
8 Pek. Cor Balok Latey Teras (2B1 25/45) Beton K 225 + Tulangan + Bekisting El M3 2.43 ### 15,097,122.71 M3 2.43
9 Pek. Cor Ring Balok Teras (3B1 25/45) Beton K 225 + Tulangan + Bekisting El M3 2.43 ### 15,097,122.71 M3 2.43
10 Pek. Cor List Plank Teras T = 10 cm, Beton K 225 + Tulangan + Bekisting M3 4.54 ### 25,385,938.18 M3 4.54
11 Pek. Cor Plat Lantai K 225 + Tulangan + Bekisting M3 79.19 ### 442,800,097.95 M3 79.19
NO. URAIAN PEKERJAAN
KONTRAK AWAL KONTRAK ADDENDUM
SATUAN VOLUME
HARGA JUMLAH
SATUAN VOLUMESATUAN HARGA
( Rp ) ( Rp )
1 2 3 4 5 6 7 8
12 Pek. Cor Plat Daag Selasar T = 10 cm, Beton K 225 + Tulangan + Bekisting M3 18.81 ### 105,178,303.35 M3 18.81
13 Pek. Cor Kolom Lantai 2 Beton K 250 + Tulangan + Bekisting M3 34.34 ### 215,594,310.03 M3 34.34
14 Pek. Cor Kolom Pedastal 1 Elv + 4.00 s/d Elv + 5.00 Beton K 225 + Tulangan + M3 0.54 ### 3,405,596.40 M3 0.54
15 Pek. Cor Ring Balok (RB3 20/30 ) Beton K 225 + Tulangan + Bekisting Elv. + 5. M3 3.00 ### 15,761,692.80 M3 3.00
SUB TOTAL PEKERJAAN B. LANTAI II ( DUA ) ###
C. LANTAI III ( TIGA )
I PEKERJAAN STRUKTUR
1 Pek. Cor Balok Lantai (3B6 30/60) Beton K 225 + Tulangan + Bekisting M3 3.89 ### 23,968,868.88 M3 -
2 Pek. Cor Balok Lantai ( 3B1 25/45 ) Beton K 225 + Tulangan + Bekisting M3 20.39 ### 126,679,149.00 M3 -
3 Pek. Cor Balok Lantai ( 3B2 25/45 ) Beton K 225 + Tulangan + Bekisting M3 10.53 ### 64,499,545.89 M3 -
4 Pek. Cor Balok Lantai ( 3B3 25/40 ) Beton K 225 + Tulangan + Bekisting M3 18.24 ### 122,373,717.70 M3 -
5 Pek. Cor Balok Lantai ( 3B5 15/20 ) Beton K 225 + Tulangan + Bekisting M3 2.09 ### 13,066,962.15 M3 -
6 Pek. Cor Balok Lantai ( 3B7 20/30 ) Beton K 225 + Tulangan + Bekisting M3 1.58 ### 8,301,158.21 M3 -
7 Pek. Cor Plat Lantai K 225 + Tulangan + Bekisting M3 60.09 ### 336,000,225.86 M3 -
SUB TOTAL PEKERJAAN C. LANTAI III ( TIGA ) 694,889,627.68
JUMLAH TOTAL ( A + B + C ) ###
PAJAK PERTAMBAHAN NILAI ( PPn ) 10% 265,903,945.26
JUMLAH HARGA PEKERJAAN ###
JUMLAH DIBULATKAN ###
NO. URAIAN PEKERJAAN
KONTRAK AWAL KONTRAK ADDENDUM
SATUAN VOLUME
HARGA JUMLAH
SATUAN VOLUMESATUAN HARGA
( Rp ) ( Rp )
1 2 3 4 5 6 7 8
LAMPIRAN BERITA ACARA RAPAT PEMBAHASAN ADDENDUM TAMBAH KURANG PEKERJAAN
NO. KONTRAK : 05-NK/SP/KPA/PU-CK/VII/2015
LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS TANGGAL KONTRAK : 08 JULI 2015
NO. SURAT :
TANGGAL SURAT :
KONTRAK ADDENDUM
KETERANGANHARGA JUMLAH
SATUAN HARGA
( Rp ) ( Rp ) (+) (-) ( Rp ) ( Rp )
9 10 11 12 13 13 14
1,830.00 1,513,355.10 - - - - Tetap
350,000.00 350,000.00 - - - - Tetap
1,638,700.00 32,774,000.00 - - - - Tetap
49,200.00 397,044.00 - - - - Tetap
458,900.00 310,181,459.81 675.92 - 310,181,459.81 - Pekerjaan Bertambah
531,900.00 31,512,960.70 59.25 - 31,512,960.70 - Pekerjaan Bertambah
1,335,800.00 158,281,680.39 118.49 - 158,281,680.39 - Pekerjaan Bertambah
47,751.70 56,581,963.85 1,184.92 - 56,581,963.85 - Pekerjaan Bertambah
458,900.00 37,098,279.08 80.84 37,098,279.08 Pekerjaan Bertambah
531,900.00 7,166,621.14 13.47 7,166,621.14 Pekerjaan Bertambah
1,335,800.00 28,796,909.24 21.56 28,796,909.24 Pekerjaan Bertambah
1,335,800.00 22,319,009.92 16.71 22,319,009.92 Pekerjaan Bertambah
5,982,884.80 7,807,664.66 0.72 - 4,277,762.63 - Volume Bertambah
1,335,800.00 5,831,501.69 4.37 - 5,831,501.69 - Pekerjaan Bertambah
6,087,257.65 6,635,110.84 1.09 - 6,635,110.84 Pekerjaan Bertambah
PEKERJAAN TAMBAH
PEKERJAAN KURANG
HARGA TAMBAH
HARGA KURANG
KONTRAK ADDENDUM
KETERANGANHARGA JUMLAH
SATUAN HARGA
( Rp ) ( Rp ) (+) (-) ( Rp ) ( Rp )
9 10 11 12 13 13 14
PEKERJAAN TAMBAH
PEKERJAAN KURANG
HARGA TAMBAH
HARGA KURANG
6,109,892.35 26,182,110.70 4.29 - 26,182,110.70 Pekerjaan Bertambah
6,278,226.85 24,547,866.98 - - - - Tetap
6,278,226.85 449,458,260.19 - - - - Tetap
6,278,226.85 9,417,340.28 - - - - Tetap
5,253,897.60 46,129,220.93 - - - - Tetap
5,591,616.34 26,672,009.94 - - - - Tetap
6,709,085.40 11,002,900.06 - - - - Tetap
### ### -
Tetap
6,161,662.95 23,968,868.88 - - - - Tetap
6,212,807.70 203,407,324.10 - - - - Tetap
6,125,313.00 24,807,517.65 - - - - Tetap
6,709,085.40 137,670,432.41 - - - - Tetap
5,938,726.80 97,276,344.98 - - - - Tetap
6,252,135.00 17,881,106.10 - - - - Tetap
5,253,897.60 15,026,147.14 - - - - Tetap
6,212,807.70 15,097,122.71 - - - - Tetap
6,212,807.70 15,097,122.71 - - - - Tetap
5,591,616.34 25,385,938.18 - - - - Tetap
5,591,616.34 442,800,097.95 - - - - Tetap
KONTRAK ADDENDUM
KETERANGANHARGA JUMLAH
SATUAN HARGA
( Rp ) ( Rp ) (+) (-) ( Rp ) ( Rp )
9 10 11 12 13 13 14
PEKERJAAN TAMBAH
PEKERJAAN KURANG
HARGA TAMBAH
HARGA KURANG
5,591,616.34 105,178,303.35 - - - - Tetap
6,278,226.85 215,594,310.03 - - - - Tetap
6,306,660.00 3,405,596.40 - - - - Tetap
5,253,897.60 15,761,692.80 - - - - Tetap
### - -
6,161,662.95 - - 3.89 - 23,968,868.88 Pekerjaan Berkurang
6,212,807.70 - - 20.39 - 126,679,149.00 Pekerjaan Berkurang
6,125,313.00 - - 10.53 - 64,499,545.89 Pekerjaan Berkurang
6,709,085.40 - - 18.24 - 122,373,717.70 Pekerjaan Berkurang
6,252,135.00 - - 2.09 - 13,066,962.15 Pekerjaan Berkurang
5,253,897.60 - - 1.58 - 8,301,158.21 Pekerjaan Berkurang
5,591,616.34 - - 60.09 - 336,000,225.86 Pekerjaan Berkurang
- - ###
### ### ###
265,901,519.49 SELISIH 24,257.70
###
###
KONTRAK ADDENDUM
KETERANGANHARGA JUMLAH
SATUAN HARGA
( Rp ) ( Rp ) (+) (-) ( Rp ) ( Rp )
9 10 11 12 13 13 14
PEKERJAAN TAMBAH
PEKERJAAN KURANG
HARGA TAMBAH
HARGA KURANG
DAFTAR LAMPIRAN ANALISA HARGA SATUAN PEKERJAAN( ADDENDUM TAMBAH KURANG PEKERJAAN )
KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATURPEKERJAAN :
LOKASI : KABUPATEN BENGKALISTAHUN ANGGARAN : 2015
No. Jenis Pekerjaan (Rp)
1 1 M3 URUGAN TANAH PILIHAN
BAHAN Tanah Urugan Pilihan 1.2000 M3 350,000.00
TENAGA Pekerja 0.3000 Oh 108,000.00 Mandor 0.0100 Oh 150,000.00
ALAT Alat Bantu 1.0000 Ls 5,000.00
Jumlah
2 1 M2 PASANGAN GEOTEKSTIL
BAHAN Geotekstil 1.0500 M2 29,000.00
TENAGA Pekerja 0.1556 Oh 108,000.00 Mandor 0.0778 Oh 150,000.00
Jumlah
3 1 M3 BETON COR 1:3:5
BAHAN Kerikil 0.8700 M3 575,000.00 Pasir Beton 0.5200 M3 465,000.00 Semen Porltand 218.0000 Kg 1,700.00
TENAGA Pekerja 1.6500 Oh 108,000.00 Tukang Batu 0.2500 Oh 118,000.00 Kepala Tukang 0.0250 Oh 138,000.00 Mandor 0.0800 Oh 150,000.00
Jumlah
4 1 M3 MEMBUAT SLOOF 20 x 30 CM BETON BERTULANG + BEKISTING
BAHAN Kayu Terentang 0.1875 M3 2,750,000.00 Paku Biasa 2" - 5" 2.0000 Kg 25,000.00 Minyak Bekisting 0.6000 Ltr 25,000.00 Besi Beton 199.6569 Kg 16,500.00 Kawat Beton 2.9949 Kg 45,000.00
LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS
Indeks dan Satuan
Harga Bahan dan Upah
No. Jenis Pekerjaan (Rp)
Indeks dan Satuan
Harga Bahan dan Upah
Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 352.5000 Kg 1,700.00
TENAGA Pekerja 4.8500 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 1.5600 Oh 118,000.00 Tukang Besi 1.4000 Oh 118,000.00 Kepala Tukang 0.3310 Oh 138,000.00 Mandor 0.1700 Oh 150,000.00
Jumlah
No. Jenis Pekerjaan (Rp)
Indeks dan Satuan
Harga Bahan dan Upah
5 1 M3 MEMBUAT SLOOF 25 x 40 CM BETON BERTULANG + BEKISTING
BAHAN Kayu Terentang 0.1875 M3 2,750,000.00 Paku Biasa 2" - 5" 2.0000 Kg 25,000.00 Minyak Bekisting 0.6000 Ltr 25,000.00 Besi Beton 198.3391 Kg 16,500.00 Kawat Beton 2.9751 Kg 45,000.00 Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 352.5000 Kg 1,700.00
TENAGA Pekerja 4.8500 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 1.5600 Oh 118,000.00 Tukang Besi 1.4000 Oh 118,000.00 Kepala Tukang 0.3310 Oh 138,000.00 Mandor 0.1700 Oh 150,000.00
Jumlah
6 1 M3 MEMBUAT SLOOF 25 x 40 CM BETON BERTULANG + BEKISTING
BAHAN Kayu Terentang 0.1875 M3 2,750,000.00 Paku Biasa 2" - 5" 2.0000 Kg 25,000.00 Minyak Bekisting 0.6000 Ltr 25,000.00 Besi Beton 198.3391 Kg 16,500.00 Kawat Beton 2.9751 Kg 45,000.00 Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 352.5000 Kg 1,700.00
TENAGA Pekerja 4.8500 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 1.5600 Oh 118,000.00 Tukang Besi 1.4000 Oh 118,000.00 Kepala Tukang 0.3310 Oh 138,000.00 Mandor 0.1700 Oh 150,000.00
Jumlah
No. Jenis Pekerjaan (Rp)
Indeks dan Satuan
Harga Bahan dan Upah
7 1 M2 WIRE MESH M6-150
BAHAN Wire Mesh M6-150 1.0500 M2 20,282.19 Kawat Ikat Beton 0.1000 Kg 45,000.00
TENAGA Pekerja 0.1400 Oh 108,000.00 Tukang Besi 0.0467 Oh 118,000.00 Kepala Tukang 0.0046 Oh 138,000.00 Mandor 0.0046 Oh 150,000.00
Jumlah
8 1 M3 TIMBUNAN PASIR URUG
BAHAN Pasir Urug 1.2000 M3 415,000.00
TENAGA Pekerja 0.3000 Oh 108,000.00 Mandor 0.0100 Oh 150,000.00
Jumlah
DAFTAR LAMPIRAN ANALISA HARGA SATUAN PEKERJAAN( ADDENDUM TAMBAH KURANG PEKERJAAN )
PENINGKATAN SARANA DAN PRASARANA APARATUR
Jumlah Harga
(Rp)
1 M3 URUGAN TANAH PILIHAN
420,000.00
32,400.00 1,500.00
5,000.00
458,900.00
1 M2 PASANGAN GEOTEKSTIL
30,450.00
16,800.00 11,666.67
58,916.67
1 M3 BETON COR 1:3:5
500,250.00 241,800.00 370,600.00
178,200.00 29,500.00 3,450.00 12,000.00
1,335,800.00
1 M3 MEMBUAT SLOOF 20 x 30 CM BETON BERTULANG + BEKISTING
515,625.00 50,000.00 15,000.00 3,294,338.85 134,770.50
LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS
Jumlah Harga
(Rp)
287,500.00 227,850.00 599,250.00
523,800.00 41,300.00 184,080.00 165,200.00 45,678.00 25,500.00
6,109,892.35
Jumlah Harga
(Rp)
1 M3 MEMBUAT SLOOF 25 x 40 CM BETON BERTULANG + BEKISTING
515,625.00 50,000.00 15,000.00 3,272,595.15 133,879.50 287,500.00 227,850.00 599,250.00
523,800.00 41,300.00 184,080.00 165,200.00 45,678.00 25,500.00
6,087,257.65
1 M3 MEMBUAT SLOOF 25 x 40 CM BETON BERTULANG + BEKISTING
515,625.00 50,000.00 15,000.00 3,272,595.15 133,879.50 287,500.00 227,850.00 599,250.00
523,800.00 41,300.00 184,080.00 165,200.00 45,678.00 25,500.00
6,087,257.65
Jumlah Harga
(Rp)
21,296.30 4,500.00
15,120.00 5,510.60 634.80 690.00
47,751.70
1 M3 TIMBUNAN PASIR URUG
498,000.00
32,400.00 1,500.00
531,900.00
DAFTAR HARGA SATUAN UPAH DAN BAHAN( ADDENDUM TAMBAH KURANG PEKERJAAN )
KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATURPEKERJAAN :
LOKASI : KABUPATEN BENGKALISTAHUN ANGGARAN: 2015
JENIS NO UPAH DAN BAHAN SATUAN
1 2 3 4
A. BAHAN PASANGAN 1 Agregrat Kelas A M32 Agregrat Kelas B M33 Agregrat Kelas C M34 Aspal Kg5 Batu Bata Bh6 Batu Kali M37 Filler Kg8 Kerikil / Koral M39 Material Pilihan ( Sirtu ) M3
10 Pasir Pasang M311 Pasir Beton M312 Pasir Plester M313 Pasir Urug M314 Semen Portland @ 50 Kg Zak15 Semen Portland Kg16 Semen Putih Zak17 Semen Putih Kg18 Teer Kg19 Tanah Timbunan M320 Tanah Urug Pilihan M3
LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS
B. BANAH BESI, MINYA 1 Minyak Bensin Ltr DAN LAIN - LAIN 2 Minyak Pelumas Olie Ltr
3 Minyak Solar Ltr4 Minyak Tanah Ltr5 Minyak Bekisting Ltr6 Plastik Alas M27 Geotekstil M28 Wire Mesh M6-150 M29 Kawat Ikat Beton Kg
D. TENAGA KERJA 1 Kepala Tukang Orang / Hari2 Tukang Batu Orang / Hari3 Tukang Kayu Orang / Hari4 Tukang Cat Orang / Hari5 Tukang Besi Orang / Hari6 Mandor Orang / Hari7 Pekerja Orang / Hari8 Operator/Supir Jam9 Pembantu Operator/Pembantu Supir Jam
DAFTAR HARGA SATUAN UPAH DAN BAHAN( ADDENDUM TAMBAH KURANG PEKERJAAN )
PENINGKATAN SARANA DAN PRASARANA APARATUR
HARGA SATUAN( Rp )
5
850,000.00 720,000.00 680,000.00 17,000.00 1,200.00 450,000.00 2,000.00 575,000.00 525,000.00 425,000.00 465,000.00 415,000.00 415,000.00 85,000.00 1,700.00 65,000.00 1,300.00 17,000.00 165,000.00 350,000.00
LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS
12,000.00 35,000.00 15,000.00 13,000.00 25,000.00 7,000.00 29,000.00 20,282.19 45,000.00
138,000.00 118,000.00 118,000.00 118,000.00 118,000.00 150,000.00 108,000.00 14,750.00 13,500.00
LAMPIRAN URAIAN ANALISA HARGA SATUAN
JENIS PEKERJAAN : PAS. GEOTEKSTILSATUAN PEMBAYARAN : M2
No. U R A I A N KODE KOEF.
I. ASUMSI1 Pekerjaan dilakukan secara manual2 Lokasi pekerjaan : sepanjang jalan3 Kondisi Jalan terpengaruh oleh aliran air tanah4 Jam kerja efektif per-hari Tk 7.00
II. URUTAN KERJA1 Material geoteksil diterima dilokasi pekerjaan2 Pemasangan dilaksanakan sesuai dengan prosedur
yang direkomendasikan oleh pabriknya3 Pekerjaan galian dibayar tersendiri
III. PEMAKAIAN BAHAN, ALAT DAN TENAGA 1. BAHAN
Kebutuhan Geotekstil/ M2 (M23) 1.0500
2. ALAT2.b. ALAT BANTU
Diperlukan alat-alat bantu kecil : alat potong dan jahit 1.00
3. TENAGAProduksi yang dapat diselesaikan / hari Qt 90.00 Kebutuhan tenaga :
- Pekerja P 2.00 - Mandor M 1.00
Koefisien tenaga / M2- Pekerja = (Tk x P) : Qt (L01) 0.1556 - Mandor = (Tk x M) : Qt (L03) 0.0778
4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALATLihat lampiran.
5. ANALISA HARGA SATUAN PEKERJAANDidapat Harga Satuan Pekerjaan :
Rp. 58,916.67 / M2
LAMPIRAN URAIAN ANALISA HARGA SATUAN
JENIS PEKERJAAN : URUGAN TANAH PILIHANSATUAN PEMBAYARAN : M3
No. U R A I A N KODE KOEF.
I. ASUMSI1 Pekerjaan dilakukan secara mekanis2 Jam kerja efektif per-hari Tk 7.00 3 Faktor pengembangan bahan Fk 1.20 4 Tebal hamparan padat t 0.15 5 Berat volume bahan (lepas) D 1.60
II. URUTAN KERJA1 Excavator menggali dan memuat ke dalam pick up2 Pick up mengangkut ke lapangan dengan jarak
quari ke lapangan L 15.00 3 Material diratakan dengan tenaga manusia4 Material dipadatkan menggunakan stamper
III. PEMAKAIAN BAHAN, ALAT DAN TENAGA 1. BAHAN1.a. Bahan timbunan = 1 x Fk 1.20
2. ALAT2.a. EXCAVATOR
Kapasitas Bucket V 0.80 Faktor Bucket Fb 1.00 Faktor Efisiensi Alat Fa 0.83 Faktor Konversi Fv 0.90 Waktu sklus Ts1- Muat T1 4.10 Waktu Siklus = T1 x Fv Ts1 3.69
Kapasitas Produksi / Jam =V x Fb x Fa x 60 Q1 9.00 Fk x Ts1
Koefisien alat / M = 1 : Q1 0.1111
2.b.Kecepatan v 1.00 Efisiensi alat Fa 0.83 Lebar pemadatan Lb 0.50 Banyak lintasan n 22 Jumlah lapisan timbunan N 4 Tebal lapis rata-rata tp 0.30 Kap. Prod. / Jam =v x 1000 x Fa x Lb x tp Q1 1.18
n x N x (M-09)Koefisien Alat / m = 1 : Q1 0.8482
2.c. ALAT BANTUDiperlukan alat-alat bantu kecil 1.00- Sekop = 3 buah
3. TENAGAProduksi menentukan : EXCAVATOR Q1 9.00 Produksi Timbunan / hari = Tk x Q1 Qt 62.98 Kebutuhan tenaga :
TAMPER (pemadatan timbunan)
- Pekerja P 2.00 - Mandor M 1.00
Koefisien tenaga / M3 :- Pekerja = (Tk x P) : Qt 0.2223 - Mandor = (Tk x M) : Qt 0.0556
4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALATLihat lampiran.
5. ANALISA HARGA SATUAN PEKERJAANDidapat Harga Satuan Pekerjaan :
Rp. Err:509 / M3
LAMPIRAN URAIAN ANALISA HARGA SATUAN
SATUAN KETERANGAN
Jam
M2
Ls Lump Sump
M2
orangorang
JamJam
LAMPIRAN URAIAN ANALISA HARGA SATUAN
SATUAN KETERANGAN
Jam-M
Ton/M3
Km
M3
M3--
menitmenit
M3
Jam
Km / Jam-M
lintasanlintasan
MM3 / Jam
jam
Ls Lump Sump
M3/JamM3
orangorang
JamJam
LAMPIRAN URAIAN ANALISA ALAT
No. U R A I A N KODE
A. URAIAN PERALATAN1. Jenis Peralatan EXCAVATOR 80-140 HP2. Tenaga Pw3. Kapasitas Cp4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W c. Harga Alat B
B. BIAYA PASTI PER JAM KERJA1. Nilai Sisa Alat = 10 % x B C
2. Faktor Angsuran Modal = i x (1 + i)^A D(1 + i)^A - 1
3. Biaya Pasti per Jam :a. Biaya Pengembalian Modal = ( B - C ) x D E
W
b. Asuransi, dll = 0.002 x B FW
Biaya Pasti per Jam = ( E + F ) G
C. BIAYA OPERASI PER JAM KERJA
1. Bahan Bakar = (12%-15%) x Pw x Ms H
2. Pelumas = (2.5%-3%) x Pw x Mp I
Biaya bengkel (6.25% dan 8.75%) x B J W
3. Perawatan dan (12,5 % - 17,5 %) x B K perbaikan = W
4. Operator = ( 1 Orang / Jam ) x U1 L5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M
Biaya Operasi per Jam = (H+I+K+L+M) P
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S
E. LAIN - LAIN1. Tingkat Suku Bunga i2. Upah Operator / Sopir U13. Upah Pembantu Operator / Pmb.Sopir U2
4. Bahan Bakar Bensin Mb5. Bahan Bakar Solar Ms6. Minyak Pelumas Mp
LAMPIRAN URAIAN ANALISA ALAT
No. U R A I A N KODE
A. URAIAN PERALATAN1. Jenis Peralatan TAMPER2. Tenaga Pw3. Kapasitas Cp4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W c. Harga Alat B
B. BIAYA PASTI PER JAM KERJA1. Nilai Sisa Alat = 10 % x B C
2. Faktor Angsuran Modal = i x (1 + i)^A D(1 + i)^A - 1
3. Biaya Pasti per Jam :a. Biaya Pengembalian Modal = ( B - C ) x D E
W
b. Asuransi, dll = 0.002 x B FW
Biaya Pasti per Jam = ( E + F ) G
C. BIAYA OPERASI PER JAM KERJA
1. Bahan Bakar = (12%-15%) x Pw x Ms H
2. Pelumas = (2.5%-3%) x Pw x Mp I
Biaya bengkel (6.25% dan 8.75%) x B J W
3. Perawatan dan (12,5 % - 17,5 %) x B K perbaikan = W
4. Operator = ( 1 Orang / Jam ) x U1 L5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M
Biaya Operasi per Jam = (H+I+K+L+M) P
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S
E. LAIN - LAIN1. Tingkat Suku Bunga i2. Upah Operator / Sopir U13. Upah Pembantu Operator / Pmb.Sopir U2
4. Bahan Bakar Bensin Mb5. Bahan Bakar Solar Ms6. Minyak Pelumas Mp
LAMPIRAN URAIAN ANALISA ALAT
KOEF. SATUAN KET.
EXCAVATOR 80-140 HP110.0 HP
0.80 M35.0 Tahun
2,000.0 Jam850,000,000 Rupiah
85,000,000 Rupiah
0.29832 -
114,105.70 Rupiah
850.00 Rupiah
114,955.70 Rupiah
198,000.00 Rupiah
96,250.00 Rupiah
37,188 Rupiah
53,125.00 Rupiah
14,750.00 Rupiah13,500.00 Rupiah
412,812.50 Rupiah
527,768.20 Rupiah
15.00 % / Tahun14,750.00 Rp./Jam13,500.00 Rp./Jam
12,000.00 Liter15,000.00 Liter35,000.00 Liter
LAMPIRAN URAIAN ANALISA ALAT
KOEF. SATUAN KET.
TAMPER5.0 HP
17.300 kN4.0 Tahun
1,000.0 Jam17,000,000 Rupiah
1,700,000 Rupiah
0.35027 -
5,359.06 Rupiah
0.00 Rupiah
5,359.06 Rupiah
9,000.00 Rupiah
4,375.00 Rupiah
1,063 Rupiah
2,125.00 Rupiah
14,750.00 Rupiah13,500.00 Rupiah
44,812.50 Rupiah
50,171.56 Rupiah
15.00 % / Tahun14,750.00 Rp./Jam13,500.00 Rp./Jam
12,000.00 Liter15,000.00 Liter35,000.00 Liter
Lembar 125
BACK UP DATA PENGUKURAN TIMBUNAN
KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATUR
PEKERJAAN :
:
LOKASI : KABUPATEN BENGKALIS
TAHUN ANGGARAN: 2015
NoPanjang Lebar Tinggi Luas Volume
M M M M2 M3
1 1.000 ### 0.700 1.000 0.700
2 1.000 5.700 0.950 5.700 5.415
3 2.100 3.300 0.950 6.930 6.584
4 1.000 5.700 0.950 5.700 5.415
5 1.000 2.100 0.950 2.100 1.995
6 3.300 1.000 0.900 3.300 2.970
7 3.300 5.700 0.980 18.810 18.434
8 3.300 ### 0.850 10.890 9.257
9 3.300 5.700 1.200 18.810 22.572
10 3.300 2.150 1.050 7.095 7.450
11 3.350 0.960 0.900 3.216 2.894
12 3.350 5.700 1.050 19.095 20.050
13 3.350 3.300 0.950 11.055 10.502
14 3.350 5.700 1.100 19.095 21.005
15 3.350 2.150 1.000 7.203 7.203
16 3.420 0.950 0.900 3.249 2.924
17 3.420 5.700 1.050 19.494 20.469
18 3.420 3.300 0.980 11.286 11.060
19 3.420 5.700 0.850 19.494 16.570
20 3.420 2.150 0.850 7.353 6.250
21 3.350 0.950 0.900 3.183 2.864
22 3.350 5.700 0.920 19.095 17.567
23 3.350 3.300 0.950 11.055 10.502
24 3.350 5.700 0.920 19.095 17.567
25 3.350 2.150 0.980 7.203 7.058
26 3.320 1.000 0.900 3.320 2.988
27 3.320 5.700 0.850 18.924 16.085
28 3.320 3.300 0.820 10.956 8.984
SUB TOTAL 293.705 283.334
Diperiksa Oleh : Dibuat Oleh :
KONSULTAN PENGAWAS KONTRAKTOR PELAKSANACV. MULTY DESEKO PT. TIGA PUTRA WIJAYA
LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS
Kuantitas ( N )
Lembar 126
ADE DESRY KURNIAWAN, A.Md MUSMULYADIInspector Pelaksana Lapangan
Lembar 127
BACK UP DATA PENGUKURAN TIMBUNAN
KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATUR
PEKERJAAN :
:
LOKASI : KECAMATAN BENGKALIS
TAHUN ANGGARAN: 2015
NoPanjang Lebar Tinggi Luas Volume
M M M M2 M3
29 3.320 5.700 0.800 18.924 15.139
30 3.320 2.150 0.780 7.138 5.568
31 2.130 0.900 0.550 1.917 1.054
32 2.130 5.700 0.580 12.141 7.042
33 2.130 3.300 0.800 7.029 5.623
34 2.130 5.700 0.850 12.141 10.320
35 2.130 3.360 0.670 7.157 4.795
36 3.350 0.900 0.450 3.015 1.357
37 3.350 5.700 0.450 19.095 8.593
38 3.350 3.300 0.450 11.055 4.975
39 3.350 5.700 0.650 19.095 12.412
40 3.350 0.900 0.520 3.015 1.568
41 3.350 2.250 0.600 7.538 4.523
42 3.400 3.300 0.550 11.220 6.171
43 3.400 2.100 0.480 7.140 3.427
44 3.400 3.300 0.480 11.220 5.386
45 3.400 0.900 0.500 3.060 1.530
46 3.400 2.250 0.500 7.650 3.825
47 3.400 3.300 0.520 11.220 5.834
48 3.400 2.250 0.550 7.650 4.208
49 3.400 3.300 0.550 11.220 6.171
50 3.400 0.900 0.500 3.060 1.530
51 3.400 2.250 0.500 7.650 3.825
52 3.400 0.930 0.600 3.162 1.897
53 3.400 5.700 0.550 19.380 10.659
54 3.400 3.300 0.650 11.220 7.293
55 3.400 5.700 0.500 19.380 9.690
56 - -
SUB TOTAL 263.491 154.413
Diperiksa Oleh : Dibuat Oleh :
KONSULTAN PENGAWAS KONTRAKTOR PELAKSANACV. MULTY DESEKO PT. TIGA PUTRA WIJAYA
LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS
Kuantitas ( N )
Lembar 128
ADE DESRY KURNIAWAN, A.Md MUSMULYADIInspector Pelaksana Lapangan
Lembar 129
BACK UP DATA PENGUKURAN TIMBUNAN
KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATUR
PEKERJAAN :
:
LOKASI : KECAMATAN BENGKALIS
TAHUN ANGGARAN: 2015
NoPanjang Lebar Tinggi Luas Volume
M M M M2 M3
57 3.400 0.900 0.560 3.060 1.714
58 3.400 2.250 0.550 7.650 4.208
59 2.150 0.900 0.580 1.935 1.122
60 2.150 5.700 0.450 12.255 5.515
61 2.150 3.300 0.450 7.095 3.193
62 2.150 5.700 0.540 12.255 6.618
63 2.150 0.900 0.450 1.935 0.871
64 2.150 2.250 0.450 4.838 2.177
65 3.350 0.950 0.600 3.183 1.910
66 3.350 5.700 0.500 19.095 9.548
67 3.350 3.300 0.500 11.055 5.528
68 3.350 5.700 0.600 19.095 11.457
69 3.350 2.150 0.450 7.203 3.241
70 3.350 0.900 0.750 3.015 2.261
71 3.350 5.700 0.550 19.095 10.502
72 3.350 3.300 0.570 11.055 6.301
73 3.350 5.700 0.600 19.095 11.457
74 3.350 2.150 0.530 7.203 3.817
75 3.400 0.900 0.580 3.060 1.775
76 3.400 5.700 0.550 19.380 10.659
77 3.400 3.300 0.480 11.220 5.386
78 3.400 5.700 0.550 19.380 10.659
79 3.400 2.150 0.450 7.310 3.290
80 3.400 0.950 0.500 3.230 1.615
81 3.400 5.700 0.600 19.380 11.628
82 3.400 3.300 0.600 11.220 6.732
83 3.400 5.700 0.550 19.380 10.659
84 3.400 2.150 0.400 7.310 2.924
SUB TOTAL 290.985 156.764
Diperiksa Oleh : Dibuat Oleh :
KONSULTAN PENGAWAS KONTRAKTOR PELAKSANACV. MULTY DESEKO PT. TIGA PUTRA WIJAYA
LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS
Kuantitas ( N )
Lembar 130
ADE DESRY KURNIAWAN, A.Md MUSMULYADIInspector Pelaksana Lapangan
Lembar 131
BACK UP DATA PENGUKURAN TIMBUNAN
KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATUR
PEKERJAAN :
:
LOKASI : KECAMATAN BENGKALIS
TAHUN ANGGARAN: 2015
NoPanjang Lebar Tinggi Luas Volume
M M M M2 M3
85 3.350 0.950 0.450 3.183 1.432
86 3.350 5.700 0.500 19.095 9.548
87 3.350 3.300 0.500 11.055 5.528
88 3.350 5.700 0.450 19.095 8.593
89 3.350 2.150 0.400 7.203 2.881
90 1.000 0.970 0.550 0.970 0.534
91 1.000 5.700 0.450 5.700 2.565
92 2.160 3.300 0.400 7.128 2.851
93 0.980 5.700 0.460 5.586 2.570
94 0.970 2.150 0.450 2.086 0.938
95 6.980 6.950 0.480 48.511 23.285
96 6.980 5.700 0.520 39.786 20.689
SUB TOTAL 169.397 81.413
JUMLAH TOTAL TIMBUNAN ### 675.92
Diperiksa Oleh : Dibuat Oleh :
KONSULTAN PENGAWAS KONTRAKTOR PELAKSANACV. MULTY DESEKO PT. TIGA PUTRA WIJAYA
LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS
Kuantitas ( N )
Lembar 132
ADE DESRY KURNIAWAN, A.Md MUSMULYADIInspector Pelaksana Lapangan
Lembar 133
BACK UP DATA PENGUKURAN TIMBUNAN
PENINGKATAN SARANA DAN PRASARANA APARATUR
Keterangan
KONTRAKTOR PELAKSANAPT. TIGA PUTRA WIJAYA
LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS
Lembar 134
MUSMULYADIPelaksana Lapangan
Lembar 135
BACK UP DATA PENGUKURAN TIMBUNAN
PENINGKATAN SARANA DAN PRASARANA APARATUR
Keterangan
Salah Cat
KONTRAKTOR PELAKSANAPT. TIGA PUTRA WIJAYA
LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS
Lembar 136
MUSMULYADIPelaksana Lapangan
Lembar 137
BACK UP DATA PENGUKURAN TIMBUNAN
PENINGKATAN SARANA DAN PRASARANA APARATUR
Keterangan
KONTRAKTOR PELAKSANAPT. TIGA PUTRA WIJAYA
LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS
Lembar 138
MUSMULYADIPelaksana Lapangan
Lembar 139
BACK UP DATA PENGUKURAN TIMBUNAN
PENINGKATAN SARANA DAN PRASARANA APARATUR
Keterangan
KONTRAKTOR PELAKSANAPT. TIGA PUTRA WIJAYA
LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS
M3
Lembar 140
MUSMULYADIPelaksana Lapangan
BACK UP DATA PENGUKURAN LANTAI KERJA
KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATUR
PEKERJAAN :
LOKASI : KABUPATEN BENGKALIS
TAHUN ANGGARAN: 2015
TipePanjang Lebar Tinggi
m m m
4 2.300 0.500 0.250
4 2.600 0.550 0.230
9 2.300 0.550 0.260
9 4.400 0.550 0.210
10 3.200 0.550 0.240
14 2.400 0.550 0.220
15 3.100 0.550 0.230
15 2.800 0.500 0.190
15 2.000 0.550 0.210
18 3.000 0.550 0.230
18 1.400 0.550 0.220
19 4.400 0.550 0.210
23 2.000 0.550 0.230
TOTAL
Diperiksa Oleh : Dibuat Oleh :KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS
Kuantitas ( N )
CV. MULTY DESEKO PT. TIGA PUTRA WIJAYA
ADE DESRY KURNIAWAN, A.Md MUSMULYADIInspector Pelaksana Lapangan
BACK UP DATA PENGUKURAN LANTAI KERJA
KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATUR
PEKERJAAN :
LOKASI : KABUPATEN BENGKALIS
TAHUN ANGGARAN: 2015
LAMPIRAN
Diperiksa Oleh : Dibuat Oleh :KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS
CV. MULTY DESEKO PT. TIGA PUTRA WIJAYA
ADE DESRY KURNIAWAN, A.Md MUSMULYADIInspector Pelaksana Lapangan
BACK UP DATA PENGUKURAN LANTAI KERJA
PENINGKATAN SARANA DAN PRASARANA APARATUR
Volume
m3
0.288
0.329
0.329
0.508
0.422
0.290
0.392
0.266
0.231
0.380
0.169
0.508
0.253
4.366
Dibuat Oleh :KONTRAKTOR PELAKSANA
LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS
PT. TIGA PUTRA WIJAYA
MUSMULYADIPelaksana Lapangan
BACK UP DATA PENGUKURAN LANTAI KERJA
PENINGKATAN SARANA DAN PRASARANA APARATUR
LAMPIRAN
Dibuat Oleh :KONTRAKTOR PELAKSANA
LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS
PT. TIGA PUTRA WIJAYA
MUSMULYADIPelaksana Lapangan
BACK UP DATA HITUNGAN PEKERJAAN SLOOF
KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATUR
PEKERJAAN :
LOKASI : KABUPATEN BENGKALIS
TAHUN ANGGARAN : 2015
Panjang Lebar Tinggi Volume
M M M M3
1S2 ( 25 x 40 ) Detail C 3.350 0.250 0.400 2.000 0.670
1S2 ( 25 x 40 ) Detail C 2.100 0.250 0.400 2.000 0.420
Jumlah Total Volume 1.090
1S3 ( 20 x 30 ) Detail A 3.350 0.200 0.300 3.000 0.603
1S3 ( 20 x 30 ) Detail A 3.975 0.200 0.300 2.000 0.477
1S3 ( 20 x 30 ) Detail B 2.150 0.200 0.300 1.000 0.129
1S3 ( 20 x 30 ) Detail C 1.270 0.200 0.300 4.000 0.305
1S3 ( 20 x 30 ) Detail C 3.320 0.200 0.300 2.000 0.398
1S3 ( 20 x 30 ) Detail C 2.190 0.200 0.300 2.000 0.263
1S3 ( 20 x 30 ) Detail C 4.060 0.200 0.300 2.000 0.487
1S3 ( 20 x 30 ) Detail C 1.340 0.200 0.300 2.000 0.161
1S3 ( 20 x 30 ) Detail C 1.410 0.200 0.300 2.000 0.169
1S3 ( 20 x 30 ) Detail C 5.750 0.200 0.300 2.000 0.690
1S3 ( 20 x 30 ) Detail D 3.350 0.200 0.300 1.000 0.201
1S3 ( 20 x 30 ) Detail E 3.350 0.200 0.300 2.000 0.402
Jumlah Total Volume 4.285
1S4 ( 15 x 20 ) Detail A 1.580 0.150 0.200 4.000 0.190
1S4 ( 15 x 20 ) Detail B 3.350 0.150 0.200 4.000 0.402
1S4 ( 15 x 20 ) Detail B 2.250 0.150 0.200 2.000 0.135
1S4 ( 15 x 20 ) Detail B 0.400 0.150 0.200 2.000 0.024
1S4 ( 15 x 20 ) Detail D 6.440 0.150 0.200 1.000 0.193
1S4 ( 15 x 20 ) Detail D 1.750 0.150 0.200 1.000 0.053
1S4 ( 15 x 20 ) Detail E 1.580 0.150 0.200 1.000 0.047
1S4 ( 15 x 20 ) Detail E 3.980 0.150 0.200 1.000 0.119
1S4 ( 15 x 20 ) Detail F 2.150 0.150 0.200 1.000 0.065
1S4 ( 15 x 20 ) Detail G 2.580 0.150 0.200 1.000 0.077
Jumlah Total Volume 1.305
Diperiksa Oleh : Dibuat Oleh :KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. MULTY DESEKO PT. TIGA PUTRA WIJAYA
ADE DESRY KURNIAWAN, A.Md MUSMULYADIInspector Pelaksana Lapangan
LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS
Tipe Balok Sloof
Posisi Digambar
Kuantitas
( N )
PEMERINTAH KABUPATEN BENGKALISDINAS PEKERJAAN UMUM
Jalan Pertanian No. Telp. (0766) 80010002 Fax. (0766) 80010002
BENGKALIS
KEGIATAN
PENINGKATAN SARANA DAN PRASARANA APARATUR
LAPORAN HARIANPELAKSANAAN PEKERJAAN
PEKERJAAN :
NOMOR KONTRAK : 05 - NK/SP/KPA/PU-CK/VIII/2015
TANGGAL : 08 JULI 2015
ADDENDUM I : -
TANGGAL : -
LOKASI : KABUPATEN BENGKALIS
NILAI KONTRAK : Rp. 2,924,943,000.00
PELAKSANA : PT. TIGA PUTRA WIJAYA
KONSULTAN PENGAWAS : CV. MULTY DESEKO
LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS
LAPORAN HARIAN PEKERJAAN PEMERINTAH KABUPATEN BENGKALISDINAS PEKERJAAN UMUM
KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATU
PEKERJAAN : KONTRAKTOR PELAKSANA
PT. TIGA PUTRA WIJAYAKONTRAK : 05 - NK/SP/KPA/PU-CK/VIII/2015
TANGGAL : 08 JULI 2015 KONSULTAN PENGAWAS
LOKASI : KABUPATEN BENGKALISCV. MULTY DESEKO
T. A. : 2015
JANGKA WAKTU
WAKTU PELAKSANAA 150 Hari : Mulai Tanggal : 08 Juli 2015
MENURUT KONTRAK Hari Kalender Tanggal : September 20 Sampai dengan Tanggal:
A. CUACA
WAKTU
J A M
KETERANGAN7.00 9.00 11.00 1.00 3.00 5.00
8.00 10.00 12.00 2.00 4.00 6.00
S I A N G B = BAIK
M A L A M H = HUJAN
B. TENAGA KERJA C. BAHAN - BAHAN YANG DIMASUKKAN
NO. URAIAN JUMLAH NO. JENIS BAHAN VOLUME
1 Pelaksana Lapangan Org 1
2 Adm Lapangan Org 2
3 Kep. Kerja / Mandor Org 3
4 Kepala Tukang Org 4
5 Tukang Batu Org 5
6 Tukang Besi Org 6
7 Tukang Kayu Org 7
8 Pekerja Org 8
9 Keamanan Org 9
10
T O T A L Org 11
D. PEKERJAAN YANG DILAKSANAKAN
NO. URAIAN PEKERJAAN VOLUME KETERANGAN
1.
2.
3.
4.
5.
6.
Bengkalis, September 20Diperiksa Oleh : Dibuat oleh :
KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA CV. MULTY DESEKO PT. TIGA PUTRA WIJAYA
ADE DESRY KURNIAWAN, A.Md MUSMULYADIInspector Pelaksana Lapangan
LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS
04 Desember 2015