  • KEGIATAN : PENINGKATAN SARANA DAN PRASARANA GEDUNGPEKERJAAN : PEMBANGUNAN LABORATORIUM DAN TUKLOKASI : JL. URIF SUMOHARJO KM.4 PAMPANG - MAKASSARTAHUN ANGGARAN : 2013

    PERIODEMINGGU : 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22HARI KE : 1-7 8-14 15-2 1 2 2 -2 8 2 9-35 36-42 43-49 50-56 57-63 64-70 71-77 78-84 85-91 92 -98 99-105 106-112 113-119 12 0-12 6 12 7-133 134-140 141-147 148-150

    I1 PERSIAPAN AWAL & PENGUKURAN 0,09 6 6 1002 PAGAR PENGAMAN LOKASI 0,34 63 PEKERJAAN BONGKARAN 0,39 154 PEKERJAAN PEMBERSIHAN (AWAL s/d AKHIR) 0,10 6 6 205 DIREKSI KEET /BANGSAL KERJA 0,36 6

    II PEKERJAAN LANTAI ~ 011 PEKERJAAN TANAH DAN PASIR 1,40 15 152 PEKERJAAN BATU, DINDING & PLESTERAN 3,78 15 153 PEK. BETON BERTULANG & BETON RABAT 11,54 20 20 204 PEKERJAAN PASANGAN KERAMIK 5,28 9 95 PEKERJAAN PLAFOND 0,75 9 96 PEKERJAAN PINTU, KUSEN & PARTISI 1,67 8 8 87 PEKERJAAN PENGECATAN & ACIAN 1,32 10 10 58 PEKERJAAN INSTALASI LISTRIK 0,84 69 PEKERJAAN INSTALASI SANITAIR 0,77 6 6

    III PEKERJAAN LANTAI - 021 PEKERJAAN DINDING & PLESTERAN 1,48 15 152 PEKERJAAN BETON BERTULANG 8,13 20 20 203 PEKERJAAN PASANGAN KERAMIK 1,95 9 94 PEKERJAAN PLAFOND 0,86 9 95 PEKERJAAN PINTU DAN KUSEN 1,50 8 8 86 PEKERJAAN PENGECATAN & ACIAN 1,38 10 10 57 PEKERJAAN INSTALASI LISTRIK 0,51 6 68 PEKERJAAN INSTALASI SANITAIR 0,43 6 50

    PEKERJAAN LANTAI - 03PEKERJAAN DINDING & PLESTERAN 3,07 15 15PEKERJAAN BETON BERTULANG 9,57 20 20 20 20PEKERJAAN PASANGAN KERAMIK 2,50 9 9PEKERJAAN PLAFOND 2,40 9 9PEKERJAAN PINTU, KUSEN & PARTISI 3,76 8 8 8PEKERJAAN PENGECATAN & ACIAN 2,07 10 10 10PEKERJAAN INSTALASI LISTRIK 0,99 6 6 6PEKERJAAN INSTALASI SANITAIR 0,72 6PEKERJAAN TOP FLOOR & ALUCOPAN

    1 PEKERJAAN DINDING & PLESTERAN 0,60 15 152 PEKERJAAN BETON BERTULANG 0,20 20 203 PEKERJAAN KAP ATAP DAN ORNAMEN 9,62 7 9 94 PEKERJAAN PENGECATAN & ACIAN 0,68 10 10 55 PEKERJAAN INSTALASI SANITAIR 0,67 66 PEKERJAAN PENANGKAP PETIR 0,60 67 PEKERJAAN ALUCOPAN 12,46 9 9 9

    PEKERJAAN PAGAR DAN GERBANG1 PEKERJAAN TANAH DAN PASIR 0,02 102 PEKERJAAN BATU, DINDING & PLESTERAN 0,63 153 PEK. BETON BERTULANG 0,87 12 124 PEKERJAAN PASANGAN KERAMIK 0,86 7 75 PEKERJAAN PENGECATAN & ACIAN 0,69 6

    PEKERJAAN INSTALASI LISTRIK 0,13 46 PEKERJAAN HURUP & PIPA STAENLESS 2,02 5 6 0

    JUMLAH BOBOT TOTAL 100,0039,00 21,00 15,00 35,00 35,00 20,00 23,00 83,00 80,00 59,00 30,00 60,00 61,00 37,00 94,00 83,00 32,00 46,00 35,00 34,00 12,00 20,00

    Jumlah Rata-rata Orang Per Hari 11,32 7,80 10,50 15,00 17,50 17,50 20,00 7,67 11,86 11,43 8,43 7,50 12,00 12,20 7,40 11,75 11,86 8,00 9,20 8,75 6,80 6,00 20,00

    Makassar, 10 Juni 2013Penawar

    PT. BRAGAS CIPTA CONTRUKSI

    Ir. Andrias P. ParabangDirektur

    PEKERJAAN PERSIAPAN/UMUM

    Jumlah Rata-Rata Man Power / Minggu

    JADWAL PELAKSANAAN PEKERJAAN

    NOURAIAN PEKERJAAN BOBOT(%)

    M I N G G U K ESKALA

  • A. Kami atas nama Perusahaan PT. BRAGAS CIPTA CONSTRUKSIbersedia menerapkan Sistem Manajemen Keselamatan dan Kesehatan Kerja (K3) Dalam melaksanakan Pekerjaan Pembangunan Gedung Kelas Tahap II Tahun Anggaran 2013.

    B. Kami akan Menerapkan SMK3 baik secara personil atau dengan cara membentuk kelompok kerja

    C. Menerapkan Sumber daya yang diperlukan. Sumber daya ini mencakup orang/personel, perlengkapan, waktu dan dana.

    D. Melaksanakan kegiatan penyuluhan yang diarahkan untuk mencapai tujuan K3.

    E. Mengembangkan dan menerapkan sistem Manajemen K3 jika terjadi kecelakaan kerja.

    1) Identifikasi Bahaya dan Pengendalian Resiko BahayaNO. JENIS/TYPE PEKERJAAN IDENTIFIKASI JENIS BAHAYA

    & RESIKOPENGENDALIAN RESIKO K3

    Jenis Bahaya & resiko Pengendalian resiko K3a) Tertimbun longsor -> luka berat a) Buat turap Penahan Tanahb) Terjatuh kelobang -> Luka berat b) Buat pagar pengamananJenis Bahaya & resiko Pengendalian resiko K3a) Tenaga ketimpa meterial a) Membuat jembatan kerja

    b) mengatur kerja pakai alat bantuJenis Bahaya & resiko Pengendalian resiko K3a) Tenaga ketimpa batu a) Memasang cerocok bahan

    Jenis Bahaya & resiko Pengendalian resiko K3a) Jatuh dari atas -> Luka/Patah a) Membuat steleng untuk kerjab) Tenaga ketimpa Material b) Memasang cerocok bahan

    c) Memasang jembatan kerjaJenis Bahaya & resiko Pengendalian resiko K3a) Ketimpa alat -> Luka/Patah a) Membuat Tanggab) Ketimpa meterial b) Memasang sabuk pada tenaga kerjaJenis Bahaya & resiko Pengendalian resiko K3a) Jatuh dari atas -> Luka/Patah a) Membuat steleng untuk kerjab) Kena ujung Besi -> Luka b) Memasang sabuk untuk tenaga kerja

    c) Memasang jembatan kerjad) Memakai sarung tangan

    NO. JENIS/TYPE PEKERJAAN IDENTIFIKASI JENIS BAHAYA& RESIKO

    PENGENDALIAN RESIKO K3

    Jenis Bahaya & resiko Pengendalian resiko K3

    a) Jatuh dari atas -> Luka/Patah a) Membuat steleng untuk kerjab) Membuat Tanggac) Memasang sabuk untuk tenaga kerja

    Jenis Bahaya & resiko Pengendalian resiko K3a) Jatuh dari atas -> Luka/Patah a) Membuat steleng untuk kerjab) Ketimpa meterial b) Memasang Katrol Bahan

    c) Membuat Tanggad) Memakai Helm

    Jenis Bahaya & resiko Pengendalian resiko K3a) Jatuh dari atas -> Luka/Patah a) Membuat steleng untuk kerja

    b) Memasang sabuk untuk tenaga kerjac) Membuat Tangga

    Jenis Bahaya & resiko Pengendalian resiko K3a) Ketimpa meterial -> Luka a) Membuat steleng untuk kerjab) Terjatuh -> Luka berat b) Membuat Tangga

    c) Memasang jembatan kerjaJenis Bahaya & resiko Pengendalian resiko K3a) Terjatuh -> Luka/ Patah a) Membuat steleng untuk kerja

    b) Membuat Tangga

    6 Pembesian

    8. Pasangan bekisting

    1. Galian Tanah

    2. Urugan Kembali

    3 Pek. Pas. Batu Kali

    PRA-RENCANA KESELAMATAN DANKESEHATAN KERJAPRA - RK3K

    1. KEBIJAKAN K3

    2. PERENCANAAN

    10 Pas. Listplank ,Alucopan

    4 Plesteran 1Pc : 4Ps tebal 15 mm

    5 Pekerjaan Beton

    11 Pas. Atap

    9. Pek. Pasangan Batu Bata

    12 Mencat dgn Cat Minyak

  • Jenis Bahaya & resiko Pengendalian resiko K3a) Terjatuh -> Luka/ Patah a) Membuat steleng untuk kerja

    b) Membuat Tanggac) Membuat steleng untuk kerja

    2) Pemenuhan Perundang-undangan dan Persyaratan LainnyaDaftar Perundang-undangan dan persyaratan K3 yang wajib dipunyai dan dipenuhi dalam melaksanakan

    paket pekerjaan ini adalaha. UU No. 1 tahun 1970 tentang Keselamatan Kerjab. UU No. 18 Tahun 1999 tentang Jasa Konstruksic. PeraturanMenteriPUNo.09/PRT/M/2008tentangPedomanSistemManajemenKeselamatandanKesehatanKerja(SMK3)

    3) Sasaran K3 dan Program K3Sasaran K3 :

    a. Tidak ada kecelakaan kerja yang berdampak korban jiwa (Zero Fatal Accident)b. Tingkat penerapan elemen SMK3 minimal 80%c. Semua pekerja wajib memakai APD yang sesuai bahaya dan resiko pekerjaannya masing-masing.

    Program K3 :a. MelaksanakanrencanaK3denganmenyediakansumberdayaK3(APD,Rambu-rambu,Spanduk,Poster, PagarPengaman,jaringpengaman) secara konsisten.b. Melakukan inspeksi secara rutin terhadap kondisi dan cara kerja berbahaya.c. Memastikan semua pekerja untuk mamatuhi peraturan yang telah ditetapkan.

    ORGANISASI K3

    Penanggung Jawab K3

    Ir. Andrias P. ParabangDirektur

    Emergency/Kedaruratan Petugas K3 KEBAKARANP3K

    To be Name CANDRA TOMPO To be Name

    Makassar, 10 Juni 2013

    PenawarPT. BRAGAS CIPTA CONTRUKSI

    Ir. Andrias P. ParabangDirektur

    13 Mencat dengan cat tembok

  • Nomor : 21/Pen-BCC/SMAK-LAB/VI/2013Lampiran :

    Kepada Yth:Pokja 2 ULP Kementerian Perindustrian

    Di,-Jakarta

    Perihal : Penawaran Pekerjaan: Renovasi Gedung Laboratorium dan TUK

    Sehubungan dengan pengumuman Pemilihan Langsung dengan Pascakualifikasi dan DokumenPengadaan Nomor: P2-R246 tanggal 4 Juni 2013 dan setelah kami pelajari dengan saksamaDokumen Pengadaan dan Berita Acara Pemberian Penjelasan [serta adendum DokumenPengadaan], dengan ini kami mengajukan penawaran untuk pekerjaan Renovasi GedungLaborator ium dan TUK sebesar Rp. 2.261.190.000,- ( Dua Milyar Dua Ratus Enam Puluh SatuJuta Seratus Sembilan Puluh Ribu Rupiah).

    Penawaran ini sudah memperhatikan ketentuan dan persyaratan yang tercantum dalamDokumen Pengadaan untuk melaksanakan pekerjaan tersebut di atas.

    Kami akan melaksanakan pekerjaan tersebut dengan Jangka waktu pelaksanaan pekerjaanselama 150 (seratus lima puluh) hari kalender.

    Penawaran ini berlaku selama 30 (tiga puluh ) hari kalender sejak tanggal surat penawaran ini.

    Sesuai dengan persyaratan Dokumen Pengadaan, bersama Surat Penawaran ini kami lampirkan:1. Hasil pemindaian (scan) Jaminan Penawaran asli;Jaminan penawaran asli dikirim melalui pos/ jasa pengiriman atau diserahkan kepada Pokja2 ULP Kementerian Perindustrian ke alamat : Jalan Gatot Subroto Jakarta Selatan2. Hasil pemindaian atau scan surat kuasa dari pimpanan / direktur utamaperusahaan kepada penerima kuasa yang namanya tercantum dalam akte pendirian/perubahannya (apabila dikuasakan);3. File/scandaftar kuantitas dan harga;4. Scan surat perjanjian kemitraan/kerja sama operasi (apabila ada);5. File/scan dokumen penawaran teknis yang terdiri dari:

  • a. Metode Pelaksanaan;b. Jadwal Waktu Pelaksanaan;c. Daftar Personil Inti;d. Mobilisasi Peralatane. Mobilisasi Tenaga Kerjaf. Mobilisasi Materialg. Surat Dukungan ready Mix + peralatan mix dari daerah setempath. Surat Dukungan Alkopan Dan Kaca dari distributori. Jenis, kapasitas, komposisi, dan jumlah peralatan utama minimal yang dibutuhkan;j. Spesifikasi Teknis

    k. [Bagian Pekerjaan yang akan disubkontrakkan, apabila ada].6. Data kualifikasi (disikan pada SPSE);7. [Dokumen lain yang dipersyaratkan seperti Formulir Pra RK3K, DaftarBarang yang diimpor, Analisa Teknis Satuan Pekerjaan, Analisa HargaSatuanPekerjaan].

    Dengan disampaikannya Surat Penawaran ini, maka kami menyatakan sanggup dan akan tundukpada semua ketentuan yang tercantum dalam Dokumen Pengadaan.

    Penawar,PT. BRAGAS CIPTA CONSTRUKSI

    Ir. ANDARIAS P PARABANGDirektur

  • JADWAL MOBILISASI PERALATANPekerjaan : Renovasi Ruang Kelas Dan KantorLokasi : Jl. Urip Sumoharjo Km. 4 Pampang - MakassarNo. JENIS PERALATAN SATUAN JUMLAH 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 KET.

    1 Dump truck Unit 4

    2 Truck Mixer Unit 5

    3 Concrete Pump Long Boom Unit 1

    4 Tangki Air Buah 2

    5 Schafolding Set 500

    6 Conrete Vibrator Set 1

    4 Waterpass Unit 1

    5 Genset Unit 1

    6 Pompa Air Unit 2

    7 Beton Molen Unit 3

    8 Gerobak Sorong Bh 12

    9 Dan alat bantu pertukangan Ls -

    Makassar, 10 Juni 2013

    PenawarPT. BRAGAS CIPTA CONTRUKSI

    Ir. Andrias P. ParabangDirektur

  • 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    1

    3

    4

    5

    6

    7

    8

    9

    1

    3

    4

    5

    4

    Pekerjaan : Renovasi Laboratorium Dan TUK

    Lokasi : Jl. Urip Sumoharjo Km. 4 Pampang - Makassar

    Semen, Pasir, keramik, tepung afa (Bahan pek lantai pd lt.2)

    Rangka Hollow, Skrup, Gipsum, GRC (Bahan Partisi)

    Kusen aluminium, pintu/jendela aluminium, engsel (Bhn pintu & jendela)

    Bahan Pekerjaan Perlengkapan luar

    PEKERJAAN LANTAI - 03

    Semen, Pasir, Kerikil, Bhn bekisting, Besi/Kawat beton, Bata (Bhn dinding & Beton)

    Semen, Pasir pasang (Bahan plesteran)

    Rangka Hollow, Skrup, Gipsum, GRC, List (Bahan Plafon)

    Rangka Hollow, Skrup, Gipsum, GRC, List (Bahan Plafon)

    Kusen aluminium, pintu/jendela aluminium, engsel (Bhn pintu & jendela)

    Semen, Pasir, Kerikil, Bhn bekisting, Besi/Kawat beton, Bata (Bhn dinding & beton)

    Semen, Pasir pasang, (Bahan plesteran)

    Pasir urug, Semen, Pasir, Kerikil, keramik,granit,,step nozing,batu koral, batu alam (Bhn Lantai)

    Kusen aluminium, pintu/jendela aluminium, engsel (Bhn pintu & jendela)

    Semen, Pasir, Kerikil, Bhn bekisting, Besi/Kawat beton, Bata (Bhn dinding ,Beton)

    Semen, Pasir pasang,(Bahan plesteran)

    Plamur, cat dasar, cat tembok (Bahan Pengecatan)

    JADWAL MOBILISASI BAHAN

    PEKERJAAN UMUM/PERSIAPAN & LANTAI 01

    Dolken, seng gelombang, kayu klas IV

    Bahan Pembangunan Direksi keet

    Semen, Pasir, Batu Kali, Batu bata (Bahan Pek. Pondasi)

    No. JENIS MATERIALMINGGU KE

    KET.

    Rangka Hollow, Skrup, Gipsum, GRC, List (Bahan Plafon)

    Semen, Pasir, keramik (Bahan pek lantai pd lt.2)

    Plamur, cat dasar, cat tembok (Bahan Pengecatan)

    Bahan Pekerjaan Perlengkapan Dalam

    Bahan Pekerjaan Perlengkapan Dalam

    Bahan Pekerjaan Perlengkapan luar

    PEKERJAAN LANTAI - 02

    4

    6

    7

    8

    9

    1

    2

    3

    4

    7 Alucopan warna ,besi hollow bahan pendukung(bahan alucopan)

    5

    6

    1

    2

    3

    7

    8

    9

    Makassar, 10 Juni 2013

    PenawarPT. BRAGAS CIPTA CONTRUKSI

    Ir. Andrias P. ParabangDirektur

    Pipa Stainless steel dia 3" ,huruf stainless steel

    Bahan Pekerjaan Perlengkapan luar

    Bahan Pekerjaan Perlengkapan luar

    PEKERJAAN PAGAR DAN GERBANG

    Semen, Pasir, Batu Kali, Batu bata (Bahan Pek. Pondasi)

    Semen, Pasir, Kerikil, Bhn bekisting, Besi/Kawat beton, Bata (Bhn dinding ,Beton)

    Semen, Pasir pasang, Keramik Dinding,batu alam andesit halus &batu alam cirebon (Bahan plesteran)

    cat dasar, cat tembok (Bahan Pengecatan)

    PEKERJAAN TOP FLOOR & ALUCOPAN

    Semen, Pasir, Kerikil, Bhn bekisting, Besi/Kawat beton, Bata (Bhn dinding dan beton)

    Bahan Kuda-kuda,rangka baja ringan, atap zinc alumn warna, lisplank,Panel plat steel ,enamel

    ,pipa galvanized/black steel pipe, waterprofing (Bahan Pek. Atap)

    Plamur, cat dasar, cat tembok (Bahan Pengecatan)

    Bahan Pekerjaan Perlengkapan Dalam

    Rangka Hollow, Skrup, Gipsum, GRC (Bahan Partisi)

    Kusen aluminium, pintu/jendela aluminium, engsel (Bhn pintu & jendela)

    Plamur, cat dasar, cat tembok (Bahan Pengecatan)

    Bahan Pekerjaan Perlengkapan Dalam

    Bahan Pekerjaan Perlengkapan luar

  • JADWAL MOBILISASI TENAGA KERJAPekerjaan : Renovasi Ruang Kelas Dan KantorLokasi : Jl. Urip Sumoharjo Km. 4 Pampang - MakassarNo. URAIAN POSISI MINGGU KE KET.

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

    I. STAF2 Ahli Struktur1 Ahli Arsitektur2 Ahli Pelaksana Struktur3 Ahli Elektrikal5 Pelaksana Bangunan6 Logistik7 Pelaksana Ahli K38 Adm/Keuangan

    II. PEKERJA PROYEK1 Pekerja2 Mandor3 Tukang Batu4 Tukang Kayu5 Tukang Besi6 Kepala Tukang

    Makassar, 10 Juni 2013

    PenawarPT. BRAGAS CIPTA CONTRUKSI

    Ir. Andrias P. ParabangIr. Andrias P. ParabangDirektur

  • JADWAL MOBILISASI PERALATANPekerjaan : Renovasi Ruang Kelas Dan KantorLokasi : Jl. Urip Sumoharjo Km. 4 Pampang - MakassarNo. JENIS PERALATAN SATUAN JUMLAH 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 KET.

    1 Dump truck Unit 4

    2 Truck Mixer Unit 5

    3 Concrete Pump Long Boom Unit 1

    4 Tangki Air Buah 2

    5 Schafolding Set 500

    6 Conrete Vibrator Set 1

    4 Waterpass Unit 1

    5 Genset Unit 1

    6 Pompa Air Unit 2

    7 Beton Molen Unit 3

    8 Gerobak Sorong Bh 12

    9 Dan alat bantu pertukangan Ls -

    Makassar, 10 Juni 2013

    PenawarPT. BRAGAS CIPTA CONTRUKSI

    Ir. Andrias P. ParabangDirektur

  • KEGIATAN : PENINGKATAN SARANA DAN PRASARANA GEDUNGPEKERJAAN : PEMBANGUNAN LABORATORIUM DAN TUKLOKASI : JL. URIF SUMOHARJO KM.4 PAMPANG - MAKASSARTAHUN ANGGARAN : 2013

    NO URAIAN PEKERJAAN JUMLAH HARGA1 2 3I PEKERJAAN UMUM & LANTAI 01 588,471,873.75Rp

    II PEKERJAAN LANTAI - 02 333,834,352.18Rp

    III PEKERJAAN LANTAI - 03 515,909,676.75Rp

    IV PEKERJAAN TOP FLOOR & ALUCOPAN 510,177,091.11Rp

    V PEKERJAAN PAGAR DAN GERBANG 107,240,394.08Rp

    2,055,633,387.87Rp205,563,338.79Rp

    2,261,196,726.66Rp2,261,190,000.00Rp

    RENCANA ANGGARAN BIAYA

    DIBULATKANTerbilang : "Dua Milyar Dua Ratus Enam Puluh Satu Juta Seratus Sembilan Puluh Ribu Rupiah"

    REAL COSTPPn 10 %JUMLAH

    1

    2,261,190,000.00Rp

    Makassar, 10 Juni 2013Penawar

    PT. BRAGAS CIPTA CONTRUKSI

    Ir. Andrias P. ParabangDirektur

    DIBULATKANTerbilang : "Dua Milyar Dua Ratus Enam Puluh Satu Juta Seratus Sembilan Puluh Ribu Rupiah"

    1

  • KEGIATAN : PENINGKATAN SARANA DAN PRASARANA GEDUNG

    PEKERJAAN : PEMBANGUNAN LABORATORIUM DAN TUK

    LOKASI : JL. URIF SUMOHARJO KM.4 PAMPANG - MAKASSAR

    TAHUN ANGGARAN : 2013

    PERIODEMINGGU : 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22HARI KE : 1-7 8-14 15-2 1 2 2 -2 8 2 9-35 36-42 43-49 50-56 57-63 64-70 71-77 78-84 85-91 92 -98 99-105 106-112 113-119 12 0-12 6 12 7-133 134-140 141-147 148-150

    I1 Persiapan awal, Pengukuran & Pas. Bowplank 0.09 0.04 0.04 1002 Pagar Pengaman Lokasi 0.34 0.343 Pekerjaan Bongkaran 0.39 0.394 Pekerjaan Pembersihan (Awal s/d Akhir) 0.10 0.03 0.03 0.03

    ## Direksi Keet / Bangsal Kerja 0.36 0.36II PEKERJAAN LANTAI ~ 01

    1 PEKERJAAN TANAH DAN PASIR 1.40 0.70 0.702 PEKERJAAN BATU, DINDING & PLESTERAN 3.78 1.89 1.893 PEK. BETON BERTULANG & BETON RABAT 11.54 2.89 2.89 2.89 2.894 PEKERJAAN PASANGAN KERAMIK 5.28 2.64 2.645 PEKERJAAN PLAFOND 0.75 0.38 0.386 PEKERJAAN PINTU, KUSEN & PARTISI 1.67 0.56 0.56 0.567 PEKERJAAN PENGECATAN & ACIAN 1.32 0.44 0.44 0.448 PEKERJAAN INSTALASI LISTRIK 0.84 0.849 PEKERJAAN INSTALASI SANITAIR 0.77 0.39 0.39

    III PEKERJAAN LANTAI - 021 PEKERJAAN DINDING & PLESTERAN 1.48 0.74 0.742 PEKERJAAN BETON BERTULANG 8.13 2.03 2.03 2.03 2.033 PEKERJAAN PASANGAN KERAMIK 1.95 0.98 0.984 PEKERJAAN PLAFOND 0.86 0.43 0.435 PEKERJAAN PINTU DAN KUSEN 1.50 0.50 0.50 0.506 PEKERJAAN PENGECATAN & ACIAN 1.38 0.46 0.46 0.467 PEKERJAAN INSTALASI LISTRIK 0.51 0.25 0.25

    JADWAL PELAKSANAAN PEKERJAAN

    URAIAN PEKERJAAN

    PEKERJAAN PERSIAPAN/UMUM

    NOBOBOT

    (%)

    M I N G G U K ESKALA

    7 PEKERJAAN INSTALASI LISTRIK 0.51 0.25 0.258 PEKERJAAN INSTALASI SANITAIR 0.43 0.43

    PEKERJAAN LANTAI - 03PEKERJAAN DINDING & PLESTERAN 3.07 1.54 1.54 50PEKERJAAN BETON BERTULANG 9.57 2.39 2.39 2.39 2.39PEKERJAAN PASANGAN KERAMIK 2.50 1.25 1.25PEKERJAAN PLAFOND 2.40 1.20 1.20PEKERJAAN PINTU, KUSEN & PARTISI 3.76 1.25 1.25 1.25PEKERJAAN PENGECATAN & ACIAN 2.07 0.69 0.69 0.69PEKERJAAN INSTALASI LISTRIK 0.99 0.33 0.33 0.33PEKERJAAN INSTALASI SANITAIR 0.72 0.72PEKERJAAN TOP FLOOR & ALUCOPAN

    1 PEKERJAAN DINDING & PLESTERAN 0.60 0.30 0.302 PEKERJAAN BETON BERTULANG 0.20 0.10 0.103 PEKERJAAN KAP ATAP DAN ORNAMEN 9.62 3.21 3.21 3.214 PEKERJAAN PENGECATAN & ACIAN 0.68 0.23 0.23 0.235 PEKERJAAN INSTALASI SANITAIR 0.67 0.676 PEKERJAAN PENANGKAP PETIR 0.60 0.607 PEKERJAAN ALUCOPAN 12.46 3.12 3.12 3.12 3.12

    PEKERJAAN PAGAR DAN GERBANG1 PEKERJAAN TANAH DAN PASIR 0.02 0.022 PEKERJAAN BATU, DINDING & PLESTERAN 0.63 0.633 PEK. BETON BERTULANG 0.87 0.43 0.434 PEKERJAAN PASANGAN KERAMIK 0.86 0.43 0.435 PEKERJAAN PENGECATAN & ACIAN 0.69 0.69

    PEKERJAAN INSTALASI LISTRIK 0.13 0.136 PEKERJAAN HURUP & PIPA STAENLESS 2.02 1.01 1.01 0

    JUMLAH BOBOT TOTAL ###1.17 0.73 0.70 4.77 4.77 2.89 6.50 5.00 7.21 7.92 3.71 5.05 5.84 3.87 6.01 5.57 6.04 8.49 4.63 4.93 4.17 0.03

    Kemajuan Pekerjaan Komulatif 1.17 1.90 2.60 7.37 12.15 15.04 21.53 26.53 33.74 41.67 45.38 50.43 56.27 60.14 66.15 71.71 77.75 86.24 90.87 95.80 99.97 100.00

    Makassar, 10 Juni 2013

    Penawar

    PT. BRAGAS CIPTA CONTRUKSI

    Ir. Andrias P. ParabangDirektur

    Kemajuan Pekerjaan Mingguan

  • KEGIATAN : PENINGKATAN SARANA DAN PRASARANA GEDUNGPEKERJAAN : PEMBANGUNAN LABORATORIUM DAN TUKLOKASI : JL. URIF SUMOHARJO KM.4 PAMPANG - MAKASSARTAHUN ANGGARAN : 2013

    PERIODEMINGGU : 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22HARI KE : 1-7 8-14 15-2 1 2 2 -2 8 2 9-35 36-42 43-49 50-56 57-63 64-70 71-77 78-84 85-91 92 -98 99-105 106-112 113-119 12 0-12 6 12 7-133 134-140 141-147 148-150

    I1 PERSIAPAN AWAL & PENGUKURAN 0,09 6 6 1002 PAGAR PENGAMAN LOKASI 0,34 63 PEKERJAAN BONGKARAN 0,39 154 PEKERJAAN PEMBERSIHAN (AWAL s/d AKHIR) 0,10 6 6 205 DIREKSI KEET /BANGSAL KERJA 0,36 6

    II PEKERJAAN LANTAI ~ 011 PEKERJAAN TANAH DAN PASIR 1,40 15 152 PEKERJAAN BATU, DINDING & PLESTERAN 3,78 15 153 PEK. BETON BERTULANG & BETON RABAT 11,54 20 20 204 PEKERJAAN PASANGAN KERAMIK 5,28 9 95 PEKERJAAN PLAFOND 0,75 9 96 PEKERJAAN PINTU, KUSEN & PARTISI 1,67 8 8 87 PEKERJAAN PENGECATAN & ACIAN 1,32 10 10 58 PEKERJAAN INSTALASI LISTRIK 0,84 69 PEKERJAAN INSTALASI SANITAIR 0,77 6 6

    III PEKERJAAN LANTAI - 021 PEKERJAAN DINDING & PLESTERAN 1,48 15 152 PEKERJAAN BETON BERTULANG 8,13 20 20 203 PEKERJAAN PASANGAN KERAMIK 1,95 9 94 PEKERJAAN PLAFOND 0,86 9 95 PEKERJAAN PINTU DAN KUSEN 1,50 8 8 86 PEKERJAAN PENGECATAN & ACIAN 1,38 10 10 57 PEKERJAAN INSTALASI LISTRIK 0,51 6 68 PEKERJAAN INSTALASI SANITAIR 0,43 6 50

    PEKERJAAN LANTAI - 03PEKERJAAN DINDING & PLESTERAN 3,07 15 15PEKERJAAN BETON BERTULANG 9,57 20 20 20 20PEKERJAAN PASANGAN KERAMIK 2,50 9 9PEKERJAAN PLAFOND 2,40 9 9PEKERJAAN PINTU, KUSEN & PARTISI 3,76 8 8 8PEKERJAAN PENGECATAN & ACIAN 2,07 10 10 10PEKERJAAN INSTALASI LISTRIK 0,99 6 6 6PEKERJAAN INSTALASI SANITAIR 0,72 6PEKERJAAN TOP FLOOR & ALUCOPAN

    1 PEKERJAAN DINDING & PLESTERAN 0,60 15 152 PEKERJAAN BETON BERTULANG 0,20 20 203 PEKERJAAN KAP ATAP DAN ORNAMEN 9,62 7 9 94 PEKERJAAN PENGECATAN & ACIAN 0,68 10 10 55 PEKERJAAN INSTALASI SANITAIR 0,67 66 PEKERJAAN PENANGKAP PETIR 0,60 67 PEKERJAAN ALUCOPAN 12,46 9 9 9

    PEKERJAAN PAGAR DAN GERBANG1 PEKERJAAN TANAH DAN PASIR 0,02 102 PEKERJAAN BATU, DINDING & PLESTERAN 0,63 153 PEK. BETON BERTULANG 0,87 12 124 PEKERJAAN PASANGAN KERAMIK 0,86 7 75 PEKERJAAN PENGECATAN & ACIAN 0,69 6

    PEKERJAAN INSTALASI LISTRIK 0,13 46 PEKERJAAN HURUP & PIPA STAENLESS 2,02 5 6 0

    JUMLAH BOBOT TOTAL 100,0039,00 21,00 15,00 35,00 35,00 20,00 23,00 83,00 80,00 59,00 30,00 60,00 61,00 37,00 94,00 83,00 32,00 46,00 35,00 34,00 12,00 20,00

    Jumlah Rata-rata Orang Per Hari 11,32 7,80 10,50 15,00 17,50 17,50 20,00 7,67 11,86 11,43 8,43 7,50 12,00 12,20 7,40 11,75 11,86 8,00 9,20 8,75 6,80 6,00 20,00

    Makassar, 10 Juni 2013Penawar

    PT. BRAGAS CIPTA CONTRUKSI

    Ir. Andrias P. ParabangDirektur

    PEKERJAAN PERSIAPAN/UMUM

    Jumlah Rata-Rata Man Power / Minggu

    JADWAL PELAKSANAAN PEKERJAAN

    NOURAIAN PEKERJAAN BOBOT(%)

    M I N G G U K ESKALA

  • KEGIATAN : PENINGKATAN SARANA DAN PRASARANA GEDUNGPEKERJAAN : PEMBANGUNAN LABORATORIUM DAN TUKLOKASI : JL. URIF SUMOHARJO KM.4 PAMPANG - MAKASSARTAHUN ANGGARAN : 2013

    % TKDNRp % KDN

    Barang BarangI. Material Langsung ( Bahan Baku) 513,908,346.97 25.00 513,908,346.97 25.00

    II. Peralatan (Barang Jadi ) 411,126,677.57 20.00 411,126,677.57 20.00

    A. Sub Total Barang 925,035,024.54 45.00 925,035,024.54 45.00Jasa

    III. Manajemen Proyek dan Perekayasaan 411,126,677.57 15.00 411,126,677.57 15.00

    FOLMULIR REKAPITULASI PERHITUNGAN TINGKAT KOMPONEN DALAM NEGERI (TKDN)

    Uraian PekerjaanNilai Kontrak (Rp) TKDN Gabungan

    LN DN TOTAL Rp %

    JasaIII. Manajemen Proyek dan Perekayasaan 411,126,677.57 15.00 411,126,677.57 15.00

    IV. Alat Kerja / Fasilitas Kerja 411,126,677.57 20.00 411,126,677.57 20.00Peralatan

    V. Konstruksi dan Fabrikasi 205,563,338.79 10.00 205,563,338.79 10.00

    VI. Jasa Umum205,563,338.79 10.00 205,563,338.79 10.00

    B. Sub Total Jasa 1,233,380,032.72 55.00 1,233,380,032.72 55.00C. TOTAL Biaya (*A+B) 2,158,415,057.27 100.00 2,158,415,057.27 100.00Capaian nilai TKDN diatas dinyatakan sendiri oleh

    Makassar, 10 Juni 2013

    PenawarPT. BRAGAS CIPTA CONTRUKSI

    1 Tingkat Komponen Dalam Negeri2 Nilai Gabungan Barang dan Jasa dapat diambil dari nilai kontrak; Ir. Andrias P. Parabang3 Komponen dalam Negeri Direktur

  • A. Kami atas nama Perusahaan PT. BRAGAS CIPTA CONSTRUKSIbersedia menerapkan Sistem Manajemen Keselamatan dan Kesehatan Kerja (K3) Dalam melaksanakan Pekerjaan Pembangunan Gedung Kelas Tahap II Tahun Anggaran 2013.

    B. Kami akan Menerapkan SMK3 baik secara personil atau dengan cara membentuk kelompok kerja

    C. Menerapkan Sumber daya yang diperlukan. Sumber daya ini mencakup orang/personel, perlengkapan, waktu dan dana.

    D. Melaksanakan kegiatan penyuluhan yang diarahkan untuk mencapai tujuan K3.

    E. Mengembangkan dan menerapkan sistem Manajemen K3 jika terjadi kecelakaan kerja.

    1) Identifikasi Bahaya dan Pengendalian Resiko BahayaNO. JENIS/TYPE PEKERJAAN IDENTIFIKASI JENIS BAHAYA

    & RESIKOPENGENDALIAN RESIKO K3

    Jenis Bahaya & resiko Pengendalian resiko K3a) Tertimbun longsor -> luka berat a) Buat turap Penahan Tanahb) Terjatuh kelobang -> Luka berat b) Buat pagar pengamananJenis Bahaya & resiko Pengendalian resiko K3a) Tenaga ketimpa meterial a) Membuat jembatan kerja

    b) mengatur kerja pakai alat bantuJenis Bahaya & resiko Pengendalian resiko K3a) Tenaga ketimpa batu a) Memasang cerocok bahan

    Jenis Bahaya & resiko Pengendalian resiko K3a) Jatuh dari atas -> Luka/Patah a) Membuat steleng untuk kerjab) Tenaga ketimpa Material b) Memasang cerocok bahan

    c) Memasang jembatan kerjaJenis Bahaya & resiko Pengendalian resiko K3a) Ketimpa alat -> Luka/Patah a) Membuat Tanggab) Ketimpa meterial b) Memasang sabuk pada tenaga kerjaJenis Bahaya & resiko Pengendalian resiko K3a) Jatuh dari atas -> Luka/Patah a) Membuat steleng untuk kerjab) Kena ujung Besi -> Luka b) Memasang sabuk untuk tenaga kerja

    c) Memasang jembatan kerjad) Memakai sarung tangan

    NO. JENIS/TYPE PEKERJAAN IDENTIFIKASI JENIS BAHAYA& RESIKO

    PENGENDALIAN RESIKO K3

    Jenis Bahaya & resiko Pengendalian resiko K3

    a) Jatuh dari atas -> Luka/Patah a) Membuat steleng untuk kerjab) Membuat Tanggac) Memasang sabuk untuk tenaga kerja

    Jenis Bahaya & resiko Pengendalian resiko K3a) Jatuh dari atas -> Luka/Patah a) Membuat steleng untuk kerjab) Ketimpa meterial b) Memasang Katrol Bahan

    c) Membuat Tanggad) Memakai Helm

    Jenis Bahaya & resiko Pengendalian resiko K3a) Jatuh dari atas -> Luka/Patah a) Membuat steleng untuk kerja

    b) Memasang sabuk untuk tenaga kerjac) Membuat Tangga

    Jenis Bahaya & resiko Pengendalian resiko K3a) Ketimpa meterial -> Luka a) Membuat steleng untuk kerjab) Terjatuh -> Luka berat b) Membuat Tangga

    c) Memasang jembatan kerjaJenis Bahaya & resiko Pengendalian resiko K3a) Terjatuh -> Luka/ Patah a) Membuat steleng untuk kerja

    b) Membuat Tangga

    6 Pembesian

    8. Pasangan bekisting

    1. Galian Tanah

    2. Urugan Kembali

    3 Pek. Pas. Batu Kali

    PRA-RENCANA KESELAMATAN DANKESEHATAN KERJAPRA - RK3K

    1. KEBIJAKAN K3

    2. PERENCANAAN

    10 Pas. Listplank ,Alucopan

    4 Plesteran 1Pc : 4Ps tebal 15 mm

    5 Pekerjaan Beton

    11 Pas. Atap

    9. Pek. Pasangan Batu Bata

    12 Mencat dgn Cat Minyak

  • Jenis Bahaya & resiko Pengendalian resiko K3a) Terjatuh -> Luka/ Patah a) Membuat steleng untuk kerja

    b) Membuat Tanggac) Membuat steleng untuk kerja

    2) Pemenuhan Perundang-undangan dan Persyaratan LainnyaDaftar Perundang-undangan dan persyaratan K3 yang wajib dipunyai dan dipenuhi dalam melaksanakan

    paket pekerjaan ini adalaha. UU No. 1 tahun 1970 tentang Keselamatan Kerjab. UU No. 18 Tahun 1999 tentang Jasa Konstruksic. PeraturanMenteriPUNo.09/PRT/M/2008tentangPedomanSistemManajemenKeselamatandanKesehatanKerja(SMK3)

    3) Sasaran K3 dan Program K3Sasaran K3 :

    a. Tidak ada kecelakaan kerja yang berdampak korban jiwa (Zero Fatal Accident)b. Tingkat penerapan elemen SMK3 minimal 80%c. Semua pekerja wajib memakai APD yang sesuai bahaya dan resiko pekerjaannya masing-masing.

    Program K3 :a. MelaksanakanrencanaK3denganmenyediakansumberdayaK3(APD,Rambu-rambu,Spanduk,Poster, PagarPengaman,jaringpengaman) secara konsisten.b. Melakukan inspeksi secara rutin terhadap kondisi dan cara kerja berbahaya.c. Memastikan semua pekerja untuk mamatuhi peraturan yang telah ditetapkan.

    ORGANISASI K3

    Penanggung Jawab K3

    Ir. Andrias P. ParabangDirektur

    Emergency/Kedaruratan Petugas K3 KEBAKARANP3K

    To be Name CANDRA TOMPO To be Name

    Makassar, 10 Juni 2013

    PenawarPT. BRAGAS CIPTA CONTRUKSI

    Ir. Andrias P. ParabangDirektur

    13 Mencat dengan cat tembok

  • KODEANALISA

    SNI-PEK.TANAH - GALIAN1 1 m Galian Tanah Biasa Sedalam 1 m

    Tenaga : Harga Satuan Jumlah Harga1 Pekerja : 0.750 Org / Hr 50,000Rp 37,500Rp2 Mandor : 0.025 Org / Hr 100,000Rp 2,500Rp

    40,000Rp2 1 m Galian Tanah Biasa Sedalam 2 m

    Tenaga : Harga Satuan Jumlah Harga1 Pekerja : 0.900 Org / Hr 50,000Rp 45,000Rp2 Mandor : 0.045 Org / Hr 100,000Rp 4,500Rp

    49,500Rp3 1 m Urugan Kembali 1/3 Pekerjaan Galian 13,333Rp

    4 1 m Urugan PasirBahan :1 Pasir Urug : 1.200 M 120,000Rp 144,000Rp

    144,000RpTenaga : Harga Satuan Jumlah Harga1 Pekerja : 0.300 Org / Hr 50,000Rp 15,000Rp4 Mandor : 0.010 Org / Hr 100,000Rp 1,000Rp

    16,000RpBahan + Tenaga 160,000Rp

    5 1 m Urugan TanahBahan :1 Tanah Urug : 1.200 M 145,000Rp 174,000Rp

    174,000RpTenaga : Harga Satuan Jumlah Harga1 Pekerja : 0.300 Org / Hr 50,000Rp 15,000Rp4 Mandor : 0.010 Org / Hr 100,000Rp 1,000Rp

    16,000RpBahan + Tenaga 190,000Rp

    5 1 m Urugan SirtuBahan :1 Urugan Sirtu : 1.200 M 175,000Rp 210,000Rp

    210,000RpTenaga : Harga Satuan Jumlah Harga1 Pekerja : 0.250 Org / Hr 50,000Rp 12,500Rp4 Mandor : 0.010 Org / Hr 100,000Rp 1,000Rp

    13,500RpBahan + Tenaga 223,500Rp

    6 1 m Memadatkan Tanah / SirtuTenaga : Harga Satuan Jumlah Harga1 Pekerja : 0.500 Org / Hr 50,000Rp 25,000Rp2 Mandor : 0.050 Org / Hr 100,000Rp 5,000Rp

    30,000RpSNI-PEK.PONDASI

    1 1 m Pasang Pondasi Gunung, 1 Pc : 4 PsBahan : Harga Satuan Jumlah Harga

    1 Batu Gunung : 1.200 M 165,000Rp 198,000Rp2 Semen Portland : 163.0 Kg 1,125Rp 183,375Rp3 Pasir Pasang : 0.520 M 125,000Rp 65,000Rp

    446,375RpTenaga :

    1 Pekerja : 1.500 Org / Hr 50,000Rp 75,000Rp2 Tukang Batu : 0.600 Org / Hr 70,000Rp 42,000Rp3 Kepala Tukang : 0.060 Org / Hr 90,000Rp 5,400Rp4 Mandor : 0.075 Org / Hr 100,000Rp 7,500Rp

    129,900RpBahan + Tenaga 576,275Rp

    ANALISA HARGA SATUAN PEKERJAAN

    KEGIATAN KOEF JUMLAH HARGASATUAN HARGA SATUAN

    1

  • KODEANALISA

    KEGIATAN KOEF JUMLAH HARGASATUAN HARGA SATUAN

    2 1 m Pasang Pondasi Batu KosongBahan : Harga Satuan Jumlah Harga

    1 Batu Gunung : 1.200 M 165,000Rp 198,000Rp2 Pasir Urug : 0.432 M 125,000Rp 54,000Rp

    252,000RpTenaga :

    1 Pekerja : 0.780 Org / Hr 50,000Rp 39,000Rp2 Tukang Batu : 0.390 Org / Hr 70,000Rp 27,300Rp3 Kepala Tukang : 0.039 Org / Hr 90,000Rp 3,510Rp4 Mandor : 0.390 Org / Hr 100,000Rp 39,000Rp

    108,810RpBahan + Tenaga 360,810Rp

    SNI-PEK.BETON1 1 m Membuat Beton Dengan Mutu fc = 14,5 Mpa K 175, slump (12+2)cm

    Bahan : Harga Satuan Jumlah Harga1 Semen Portland : 326.000 Kg 1,125Rp 366,750Rp2 Pasir Beton : 760.000 Kg 89.29Rp 67,857Rp3 Koral Beton : 1,029.000 Kg 105Rp 108,045Rp4 Air : 215.000 Liter 25Rp 5,375Rp

    548,027RpTenaga :

    1 Pekerja : 1.650 Org / Hr 50,000Rp 82,500Rp2 Tukang Batu : 0.275 Org / Hr 70,000Rp 19,250Rp3 Kepala Tukang : 0.028 Org / Hr 90,000Rp 2,520Rp4 Mandor : 0.083 Org / Hr 100,000Rp 8,300Rp

    112,570RpBahan + Tenaga 660,597Rp

    3 1 m Membuat Beton Dengan Mutu fc = 21,7 Mpa K 250, slump (12+2)cmBahan : Harga Satuan Jumlah Harga

    1 Semen Portland : 384.000 Kg 1,125Rp 432,000Rp2 Pasir Beton : 692.000 Kg 105Rp 72,660Rp3 Koral Beton : 1,039.000 Kg 200Rp 207,800Rp4 Air : 215.000 Liter 25Rp 5,375Rp

    717,835RpTenaga :

    1 Pekerja : 1.650 Org / Hr 50,000Rp 82,500Rp2 Tukang Batu : 0.275 Org / Hr 70,000Rp 19,250Rp3 Kepala Tukang : 0.028 Org / Hr 90,000Rp 2,520Rp4 Mandor : 0.083 Org / Hr 100,000Rp 8,300Rp

    112,570RpBahan + Tenaga 830,405Rp

    4 1 m Membuat Beton Dengan Mutu fc = 24 Mpa K 275, slump (12+2)cmBahan : Harga Satuan Jumlah Harga

    1 Semen Portland : 406.000 Kg 1,125Rp 456,750Rp2 Pasir Beton : 684.000 Kg 105Rp 71,820Rp3 Koral Beton : 1,026.000 Kg 200Rp 205,200Rp4 Air : 215.000 Liter 25Rp 5,375Rp

    739,145RpTenaga :

    1 Pekerja : 1.650 Org / Hr 50,000Rp 82,500Rp2 Tukang Batu : 0.275 Org / Hr 70,000Rp 19,250Rp3 Kepala Tukang : 0.028 Org / Hr 90,000Rp 2,520Rp4 Mandor : 0.083 Org / Hr 100,000Rp 8,300Rp

    112,570RpBahan + Tenaga 851,715Rp

    6 1 Kg Pembesian Dengan Besi Polos Atau Besi UlirBahan :

    1 Besi Beton (Polos/Ulir) : 1.050 Kg 12,000Rp 12,600Rp2 Kawat Beton : 0.015 Kg 20,000Rp 300Rp

    12,900RpTenaga :

    1 Pekerja : 0.007 Org / Hr 50,000Rp 350Rp2 Tukang Besi : 0.007 Org / Hr 80,000Rp 560Rp3 Kepala Tukang : 0.0007 Org / Hr 90,000Rp 63Rp4 Mandor : 0.0004 Org / Hr 100,000Rp 40Rp

    1,013RpBahan + Tenaga 13,913Rp

    2

  • KODEANALISA

    KEGIATAN KOEF JUMLAH HARGASATUAN HARGA SATUAN

    8 1 m Pasang Bekisting Untuk PondasiBahan : Harga Satuan Jumlah Harga

    1 Kayu Terentang : 0.040 M 2,770,000Rp 110,800Rp2 Paku Biasa 2' - 5' : 0.300 Kg 17,000Rp 5,100Rp3 Minyak Bekisting : 0.100 Lt 2,500Rp 250Rp

    116,150RpTenaga :

    1 Pekerja : 0.300 Org / Hr 50,000Rp 15,000Rp2 Tukang Kayu : 0.260 Org / Hr 70,000Rp 18,200Rp3 Kepala Tukang : 0.026 Org / Hr 90,000Rp 2,340Rp4 Mandor : 0.005 Org / Hr 100,000Rp 500Rp

    36,040RpBahan + Tenaga 152,190Rp

    9 1 m Pasang Bekisting Untuk SloofBahan : Harga Satuan Jumlah Harga

    1 Kayu Terentang : 0.045 M 2,770,000Rp 124,650Rp2 Paku Biasa 2' - 5' : 0.300 Kg 17,000Rp 5,100Rp3 Minyak Bekisting : 0.100 Lt 2,500Rp 250Rp

    130,000RpTenaga :

    1 Pekerja : 0.520 Org / Hr 50,000Rp 26,000Rp2 Tukang Kayu : 0.260 Org / Hr 70,000Rp 18,200Rp3 Kepala Tukang : 0.026 Org / Hr 90,000Rp 2,340Rp4 Mandor : 0.026 Org / Hr 100,000Rp 2,600Rp

    49,140RpBahan + Tenaga 179,140Rp

    10 1 m Pasang Bekisting Untuk KolomBahan : Harga Satuan Jumlah Harga

    1 Kayu Terentang : 0.040 M 2,770,000Rp 110,800Rp2 Paku Biasa 2' - 5' : 0.400 Kg 17,000Rp 6,800Rp3 Minyak Bekisting : 0.200 Lt 2,500Rp 500Rp4 Balok Kayu Borneo : 0.015 M 4,500,000Rp 67,500Rp5 Plywood Tebal 9 mm : 0.350 Lbr 129,000Rp 45,150Rp6 Dolken Kayu Galam -8-10/4 m : 2.000 Btg 20,000Rp 40,000Rp

    270,750RpTenaga :

    1 Pekerja : 0.660 Org / Hr 50,000Rp 33,000Rp2 Tukang Kayu : 0.330 Org / Hr 70,000Rp 23,100Rp3 Kepala Tukang : 0.033 Org / Hr 90,000Rp 2,970Rp4 Mandor : 0.033 Org / Hr 100,000Rp 3,300Rp

    62,370RpBahan + Tenaga 333,120Rp

    11 1 m Pasang Bekisting Untuk BalokBahan : Harga Satuan Jumlah Harga

    1 Kayu Terentang : 0.040 M 2,770,000Rp 110,800Rp2 Paku Biasa 2' - 5' : 0.400 Kg 17,000Rp 6,800Rp3 Minyak Bekisting : 0.200 Lt 2,500Rp 500Rp4 Balok Kayu Borneo : 0.018 M 4,500,000Rp 81,000Rp5 Plywood Tebal 9 mm : 0.350 Lbr 129,000Rp 45,150Rp6 Scafolding + alat bantu : 1.000 ls 47,100Rp 47,100Rp

    291,350RpTenaga :

    1 Pekerja : 0.660 Org / Hr 50,000Rp 33,000Rp2 Tukang Kayu : 0.330 Org / Hr 70,000Rp 23,100Rp3 Kepala Tukang : 0.033 Org / Hr 90,000Rp 2,970Rp4 Mandor : 0.033 Org / Hr 100,000Rp 3,300Rp

    62,370RpBahan + Tenaga 353,720Rp

    12 1 m Pasang Bekisting Untuk LantaiBahan : Harga Satuan Jumlah Harga

    1 Kayu Terentang : 0.040 M 2,770,000Rp 110,800Rp2 Paku Biasa 2' - 5' : 0.400 Kg 17,000Rp 6,800Rp3 Minyak Bekisting : 0.200 Lt 2,500Rp 500Rp4 Balok Kayu Borneo : 0.015 M 4,500,000Rp 67,500Rp5 Plywood Tebal 9 mm : 0.350 Lbr 129,000Rp 45,150Rp6 Scafolding + alat bantu : 1.000 ls 141,300Rp 141,300Rp

    372,050Rp

    3

  • KODEANALISA

    KEGIATAN KOEF JUMLAH HARGASATUAN HARGA SATUAN

    Tenaga :1 Pekerja : 0.320 Org / Hr 50,000Rp 16,000Rp2 Tukang Kayu : 0.330 Org / Hr 70,000Rp 23,100Rp3 Kepala Tukang : 0.033 Org / Hr 90,000Rp 2,970Rp4 Mandor : 0.033 Org / Hr 100,000Rp 3,300Rp

    45,370RpBahan + Tenaga 417,420Rp

    13 1 m Pasang Bekisting Untuk TanggaBahan : Harga Satuan Jumlah Harga

    1 Kayu Kelas III : 0.030 M 2,770,000Rp 83,100Rp2 Paku Biasa 2' - 5' : 0.400 Kg 17,000Rp 6,800Rp3 Minyak Bekisting : 0.150 Lt 2,500Rp 375Rp4 Balok Kayu Borneo : 0.015 M 4,500,000Rp 67,500Rp5 Plywood Tebal 9 mm : 0.350 Lbr 129,000Rp 45,150Rp6 Dolken Kayu Galam -8-10/4 m : 2.000 Btg 20,000Rp 40,000Rp

    242,925RpTenaga :

    1 Pekerja : 0.660 Org / Hr 50,000Rp 33,000Rp2 Tukang Kayu : 0.330 Org / Hr 70,000Rp 23,100Rp3 Kepala Tukang : 0.033 Org / Hr 90,000Rp 2,970Rp4 Mandor : 0.033 Org / Hr 100,000Rp 3,300Rp

    62,370RpBahan + Tenaga 305,295Rp

    Membuat 1m3 Pondasi Poer beton bertulangBahan :

    1 Beton K-225 + Bekisting- Kayu kelas III : 0.200 m3 2,770,000Rp 554,000Rp- Paku 5 cm - 12 cm : 1.500 Kg 17,000Rp 25,500Rp- Minyak bekisting : 0.400 Liter 2,500Rp 1,000Rp- Besi beton (Polos/Ulir) : 131.361 Kg 12,000Rp 1,576,327Rp- Kawat beton : 0.197 Kg 20,000Rp 3,941Rp- Semen Portland : 336.000 Kg 1,125Rp 378,000Rp- Pasir beton : 0.540 m3 147,000Rp 79,380Rp- Kerikil Split (maks 30 mm) : 0.810 m3 265,000Rp 214,650Rp

    2,832,797.803 Tenaga

    Pekerja : 5.300 Org / Hr 50,000Rp 265,000RpTukang Batu : 0.275 Org / Hr 70,000Rp 19,250RpTukang Kayu : 1.300 Org / Hr 70,000Rp 91,000RpTukang Besi : 1.050 Org / Hr 70,000Rp 73,500RpKepala Tukang : 0.262 Org / Hr 90,000Rp 23,580RpMandor : 0.265 Org / Hr 100,000Rp 26,500Rp

    498,830RpBahan + Tenaga 3,331,628Rp

    Membuat 1m3 Sloef Beton BertulangBahan :

    1 Beton K-225 + Bekisting- Kayu kelas III : 0.270 m3 2,770,000Rp 747,900Rp- Paku 5 cm - 12 cm : 2.000 Kg 17,000Rp 34,000Rp- Minyak bekisting : 0.600 Liter 2,500Rp 1,500Rp- Semen Portland : 336.000 Kg 1,125Rp 378,000Rp- Pasir beton : 0.540 m3 147,000Rp 79,380Rp- Kerikil Split (maks 30 mm) : 0.810 m3 265,000Rp 214,650Rp

    1,455,430.002 Pembesian

    Sloef 25 x 45 cm (S1)- Besi beton (Polos/Ulir) : 147.120 Kg 12,000Rp 1,765,437Rp- Kawat beton : 0.221 Kg 20,000Rp 4,414Rp

    1,769,850RpSloef 20 x 40 cm (S2)- Besi beton (Polos/Ulir) : 132.753 Kg 12,000Rp 1,593,036Rp- Kawat beton : 0.199 Kg 20,000Rp 3,983Rp

    1,597,019Rp

    Beton + Bekisting

    Beton + Bekisting

    Sloef 25 x 45 cm (S1)

    Sloef 20 x 40 cm (S2)

    4

  • KODEANALISA

    KEGIATAN KOEF JUMLAH HARGASATUAN HARGA SATUAN

    Sloef 15 x 30 cm (S3)- Besi beton (Polos/Ulir) : 176.821 Kg 12,000Rp 2,121,856Rp- Kawat beton : 0.265 Kg 20,000Rp 5,305Rp

    2,127,161RpSloef 15 x 20 cm (S4)- Besi beton (Polos/Ulir) : 131.520 Kg 12,000Rp 1,578,240Rp- Kawat beton : 0.197 Kg 20,000Rp 3,946Rp

    1,582,186Rp3 Tenaga

    Pekerja : 5.650 Org / Hr 50,000Rp 282,500RpTukang Batu : 0.275 Org / Hr 70,000Rp 19,250RpTukang Kayu : 1.560 Org / Hr 70,000Rp 109,200RpTukang Besi : 1.400 Org / Hr 70,000Rp 98,000RpKepala Tukang : 0.323 Org / Hr 90,000Rp 29,070RpMandor : 0.283 Org / Hr 100,000Rp 28,300Rp

    566,320Rp3,791,600Rp3,618,769Rp4,148,911Rp3,603,936Rp

    Membuat 1m3 Kolom Beton BertulangBahan :

    1 Beton K-225 + Bekisting- Kayu kelas III : 0.400 m3 2,770,000Rp 1,108,000Rp- Paku 5 cm - 12 cm : 4.000 Kg 17,000Rp 68,000Rp- Minyak bekisting : 2.000 Liter 2,500Rp 5,000Rp- Semen Portland : 336.000 Kg 1,125Rp 378,000Rp- Pasir beton : 0.540 m3 147,000Rp 79,380Rp- Kerikil Split (maks 30 mm) : 0.810 m3 265,000Rp 214,650Rp- Balok kayu kls II : 0.015 m3 4,500,000Rp 67,500Rp- Plywood tebal 9 mm : 3.500 Lbr 129,000Rp 451,500Rp- Dolken kayu, (8-10) cm : 20.000 batang 20,000Rp 400,000Rp

    2,772,030.002 Pembesian

    Kolom 40 x 40 cm (K1)- Besi beton (Polos/Ulir) : 116.313 Kg 12,000Rp 1,395,756Rp- Kawat beton : 0.174 Kg 20,000Rp 3,489Rp

    1,399,245RpKolom 25 x 50 cm (K2)- Besi beton (Polos/Ulir) : 135.466 Kg 12,000Rp 1,625,587Rp- Kawat beton : 0.203 Kg 20,000Rp 4,064Rp

    1,629,651RpKolom 20 x 40 cm (K3)- Besi beton (Polos/Ulir) : 183.923 Kg 12,000Rp 2,207,070Rp- Kawat beton : 0.276 Kg 20,000Rp 5,518Rp

    2,212,588RpKolom 20 x 40 cm (K4)- Besi beton (Polos/Ulir) : 167.894 Kg 12,000Rp 2,014,722Rp- Kawat beton : 0.252 Kg 20,000Rp 5,037Rp

    2,019,759RpKolom 40 x 40 cm (K5)- Besi beton (Polos/Ulir) : 107.066 Kg 12,000Rp 1,284,786Rp- Kawat beton : 0.161 Kg 20,000Rp 3,212Rp

    1,287,998RpKolom 30 x 30 cm (K6)- Besi beton (Polos/Ulir) : 95.352 Kg 12,000Rp 1,144,224Rp- Kawat beton : 0.143 Kg 20,000Rp 2,861Rp

    1,147,085RpKolom 30 x 30 cm (K7)- Besi beton (Polos/Ulir) : 55.896 Kg 12,000Rp 670,752Rp- Kawat beton : 0.084 Kg 20,000Rp 1,677Rp

    672,429RpKolom 25 x 25 cm (K8)- Besi beton (Polos/Ulir) : 108.899 Kg 12,000Rp 1,306,783Rp- Kawat beton : 0.163 Kg 20,000Rp 3,267Rp

    1,310,050Rp

    Kolom 40 x 40 cm (K5)

    Sloef 20 x 40 cm (S2)

    Beton + Bekisting

    Kolom 25 x 50 cm (K2)

    Kolom 40 x 40 cm (K1)

    Sloef 15 x 30 cm (S3)

    Sloef 15 x 20 cm (S4)

    Sloef 25 x 45 cm (S1)

    Sloef 15 x 30 cm (S3)

    Kolom 30 x 30 cm (K6)

    Kolom 30 x 30 cm (K7)

    Kolom 25 x 25 cm (K8)

    Kolom 20 x 40 cm (K3)

    Kolom 20 x 40 cm (K4)

    Sloef 15 x 20 cm (S4)

    5

  • KODEANALISA

    KEGIATAN KOEF JUMLAH HARGASATUAN HARGA SATUAN

    Kolom 15 x 30 cm (K9)- Besi beton (Polos/Ulir) : 151.248 Kg 12,000Rp 1,814,976Rp- Kawat beton : 0.227 Kg 20,000Rp 4,537Rp

    1,819,513RpKolom 15 x 25 cm (K10)- Besi beton (Polos/Ulir) : 181.498 Kg 12,000Rp 2,177,971Rp- Kawat beton : 0.272 Kg 20,000Rp 5,445Rp

    2,183,416RpKolom 15 x 15 cm (K11)- Besi beton (Polos/Ulir) : 175.360 Kg 12,000Rp 2,104,320Rp- Kawat beton : 0.263 Kg 20,000Rp 5,261Rp

    2,109,581Rp3 Tenaga

    Pekerja : 5.650 Org / Hr 50,000Rp 282,500RpTukang Batu : 0.275 Org / Hr 70,000Rp 19,250RpTukang Kayu : 1.560 Org / Hr 70,000Rp 109,200RpTukang Besi : 1.400 Org / Hr 70,000Rp 98,000RpKepala Tukang : 0.323 Org / Hr 90,000Rp 29,070RpMandor : 0.283 Org / Hr 100,000Rp 28,300Rp

    566,320Rp4,737,595Rp4,968,001Rp5,550,938Rp5,358,109Rp4,626,348Rp4,485,435Rp4,010,779Rp4,648,400Rp5,157,863Rp5,521,766Rp5,447,931Rp

    Membuat 1m3 Balok Beton BertulangBahan :

    1 Beton K-225 + Bekisting- Kayu kelas III : 0.320 m3 2,770,000Rp 886,400Rp- Paku 5 cm - 12 cm : 3.200 Kg 17,000Rp 54,400Rp- Minyak bekisting : 1.600 Liter 2,500Rp 4,000Rp- Semen Portland : 336.000 Kg 1,125Rp 378,000Rp- Pasir beton : 0.540 m3 147,000Rp 79,380Rp- Kerikil Split (maks 30 mm) : 0.810 m3 265,000Rp 214,650Rp- Balok kayu kls II : 0.140 m3 4,500,000Rp 630,000Rp- Plywood tebal 9 mm : 2.800 Lbr 129,000Rp 361,200Rp- Dolken kayu, (8-10) cm : 16.000 batang 20,000Rp 320,000Rp

    2,928,030.002 Pembesian

    Balok 30 x 75 cm (B1)- Besi beton (Polos/Ulir) : 214.419 Kg 12,000Rp 2,573,024Rp- Kawat beton : 0.322 Kg 20,000Rp 6,433Rp

    2,579,457RpBalok 25 x 50 cm (B2)- Besi beton (Polos/Ulir) : 176.401 Kg 12,000Rp 2,116,814Rp- Kawat beton : 0.265 Kg 20,000Rp 5,292Rp

    2,122,106RpBalok 20 x 40 cm (B3)- Besi beton (Polos/Ulir) : 162.962 Kg 12,000Rp 1,955,538Rp- Kawat beton : 0.244 Kg 20,000Rp 4,889Rp

    1,960,427RpBalok 20 x 30 cm (B4)- Besi beton (Polos/Ulir) : 153.988 Kg 12,000Rp 1,847,856Rp- Kawat beton : 0.231 Kg 20,000Rp 4,620Rp

    1,852,476RpBalok 15 x 30 cm (B5)- Besi beton (Polos/Ulir) : 151.248 Kg 12,000Rp 1,814,976Rp- Kawat beton : 0.227 Kg 20,000Rp 4,537Rp

    1,819,513Rp

    Beton + Bekisting

    Balok 30 x 75 cm (B1)

    Kolom 15 x 25 cm (K10)Kolom 15 x 15 cm (K11)

    Balok 25 x 50 cm (B2)

    Balok 20 x 40 cm (B3)

    Balok 20 x 30 cm (B4)

    Balok 15 x 30 cm (B5)

    Kolom 40 x 40 cm (K1)Kolom 25 x 50 cm (K2)Kolom 20 x 40 cm (K3)Kolom 20 x 40 cm (K4)

    Kolom 15 x 30 cm (K9)

    Kolom 15 x 15 cm (K11)

    Kolom 30 x 30 cm (K6)Kolom 30 x 30 cm (K7)Kolom 25 x 25 cm (K8)

    Kolom 40 x 40 cm (K5)

    Kolom 15 x 30 cm (K9)

    Kolom 15 x 25 cm (K10)

    6

  • KODEANALISA

    KEGIATAN KOEF JUMLAH HARGASATUAN HARGA SATUAN

    Balok 12 x 50 cm (B6)- Besi beton (Polos/Ulir) : 134.808 Kg 12,000Rp 1,617,696Rp- Kawat beton : 0.202 Kg 20,000Rp 4,044Rp

    1,621,740RpBalok 15 x 20 cm (B7)- Besi beton (Polos/Ulir) : 167.688 Kg 12,000Rp 2,012,256Rp- Kawat beton : 0.252 Kg 20,000Rp 5,031Rp

    2,017,287RpBalok 15 x 30 cm (B8)- Besi beton (Polos/Ulir) : 179.744 Kg 12,000Rp 2,156,928Rp- Kawat beton : 0.270 Kg 20,000Rp 5,392Rp

    2,162,320RpBalok (RB)- Besi beton (Polos/Ulir) : 57.391 Kg 12,000Rp 688,687Rp- Kawat beton : 0.086 Kg 20,000Rp 1,722Rp

    690,408RpBalok 15 x 20 cm (Latei - LT1)- Besi beton (Polos/Ulir) : 131.520 Kg 12,000Rp 1,578,240Rp- Kawat beton : 0.197 Kg 20,000Rp 3,946Rp

    1,582,186RpBalok Gawangan Entrance 15 x 30 cm- Besi beton (Polos/Ulir) : 111.792 Kg 12,000Rp 1,341,504Rp- Kawat beton : 0.168 Kg 20,000Rp 3,354Rp

    1,344,858RpBalok 15 x 40 cm (B9)- Besi beton (Polos/Ulir) : 134.808 Kg 12,000Rp 1,617,696Rp- Kawat beton : 0.202 Kg 20,000Rp 4,044Rp

    1,621,740RpBalok 20 x 50 cm (B10)- Besi beton (Polos/Ulir) : 184.005 Kg 12,000Rp 2,208,056Rp- Kawat beton : 0.276 Kg 20,000Rp 5,520Rp

    2,213,577Rp3 Tenaga

    Pekerja : 6.350 Org / Hr 50,000Rp 317,500RpTukang Batu : 0.275 Org / Hr 70,000Rp 19,250RpTukang Kayu : 1.650 Org / Hr 70,000Rp 115,500RpTukang Besi : 1.400 Org / Hr 70,000Rp 98,000RpKepala Tukang : 0.333 Org / Hr 90,000Rp 29,970RpMandor : 0.318 Org / Hr 100,000Rp 31,800Rp

    612,020Rp6,119,507Rp5,662,156Rp5,500,477Rp5,392,526Rp5,359,563Rp5,161,790Rp5,557,337Rp5,702,370Rp5,161,790Rp4,230,458Rp5,122,236Rp4,884,908Rp5,753,627Rp

    Membuat 1m3 Tangga Beton BertulangBahan :

    1 - Kayu kelas III : 0.250 m3 2,770,000Rp 692,500Rp2 - Paku 5 cm - 12 cm : 3.000 Kg 17,000Rp 51,000Rp3 - Minyak bekisting : 1.200 Liter 2,500Rp 3,000Rp4 - Besi Beton : 150.000 Kg 12,000Rp 1,800,000Rp5 - Kawat Beton : 2.250 Kg 20,000Rp 45,000Rp6 - Semen Portland : 336.000 Kg 1,125Rp 378,000Rp7 - Pasir beton : 0.520 m3 147,000Rp 76,440Rp8 - Kerikil Split (maks 30 mm) : 0.780 m3 265,000Rp 206,700Rp9 - Balok kayu kls II : 0.105 m3 4,500,000Rp 472,500Rp10 - Plywood tebal 9 mm : 2.500 Lbr 129,000Rp 322,500Rp11 - Dolken kayu, (8-10) cm : 14.000 batang 20,000Rp 280,000Rp

    4,327,640Rp

    Balok 20 x 30 cm (B4)Balok 15 x 30 cm (B5)

    Balok Gawangan Entrance 15 x 30 cmBalok 20 x 50 cm (B10)

    Balok 30 x 75 cm (B1)Balok 25 x 50 cm (B2)Balok 20 x 40 cm (B3)

    Balok 12 x 50 cm (B6)

    Balok 15 x 20 cm (B7)

    Balok 15 x 30 cm (B8)

    Balok 15 x 40 cm (B9)

    Balok 15 x 40 cm (B9)

    Balok (RB)

    Balok Gawangan Entrance 15 x 30 cm

    Balok (RB)Balok 15 x 20 cm (Latei - LT1)

    Balok 15 x 20 cm (Latei - LT1)

    Balok 12 x 50 cm (B6)Balok 15 x 20 cm (B7)Balok 15 x 30 cm (B8)

    Balok 20 x 50 cm (B10)

    7

  • KODEANALISA

    KEGIATAN KOEF JUMLAH HARGASATUAN HARGA SATUAN

    Tenaga1 Pekerja : 5.650 Org / Hr 50,000Rp 282,500Rp2 Tukang Batu : 0.350 Org / Hr 70,000Rp 24,500Rp3 Tukang Kayu : 2.300 Org / Hr 70,000Rp 161,000Rp4 Tukang Besi : 1.400 Org / Hr 70,000Rp 98,000Rp5 Kepala Tukang : 0.405 Org / Hr 90,000Rp 36,450Rp6 Mandor : 0.202 Org / Hr 100,000Rp 20,200Rp

    622,650RpBahan + Tenaga 4,950,290Rp

    Membuat 1m3 Plat Beton BertulangBahan :

    1 Beton K-225 + Bekisting- Kayu kelas III : 0.240 m3 2,770,000Rp 664,800Rp- Paku 5 cm - 12 cm : 3.200 Kg 17,000Rp 54,400Rp- Minyak bekisting : 1.600 Liter 2,500Rp 4,000Rp- Semen Portland : 336.000 Kg 1,125Rp 378,000Rp- Pasir beton : 0.540 m3 147,000Rp 79,380Rp- Kerikil Split (maks 30 mm) : 0.810 m3 265,000Rp 214,650Rp- Balok kayu kls II : 0.160 m3 4,500,000Rp 720,000Rp- Plywood tebal 9 mm : 2.800 Lbr 129,000Rp 361,200Rp- Dolken kayu, (8-10) cm : 24.000 batang 20,000Rp 480,000Rp

    2,956,430.00

    2 PembesianPlat Beton Tebal 12 cm- Besi beton (Polos/Ulir) : 113.025 Kg 12,000Rp 1,356,300Rp- Kawat beton : 0.170 Kg 20,000Rp 3,391Rp

    1,359,691RpPlat Beton Tebal 10 cm- Besi beton (Polos/Ulir) : 98.640 Kg 12,000Rp 1,183,680Rp- Kawat beton : 0.148 Kg 20,000Rp 2,959Rp

    1,186,639Rp3 Tenaga

    Pekerja : 5.300 Org / Hr 50,000Rp 265,000RpTukang Batu : 0.275 Org / Hr 70,000Rp 19,250RpTukang Kayu : 1.300 Org / Hr 70,000Rp 91,000RpTukang Besi : 1.050 Org / Hr 70,000Rp 73,500RpKepala Tukang : 0.262 Org / Hr 90,000Rp 23,580RpMandor : 0.265 Org / Hr 100,000Rp 26,500Rp

    498,830Rp4,814,951Rp4,641,899Rp

    SNI-PEK.DINDING2 1 m Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 3 Ps

    Bahan : Harga Satuan Jumlah Harga1 Bata merah 5 x 11 x 22 cm : 70.000 Bh 550Rp 38,500Rp2 Semen Portland : 14.370 Kg 1,125Rp 16,166Rp3 Pasir Pasang : 0.040 M 125,000Rp 5,000Rp

    59,666RpTenaga :

    1 Pekerja : 0.300 Org / Hr 50,000Rp 15,000Rp2 Tukang Batu : 0.100 Org / Hr 70,000Rp 7,000Rp3 Kepala Tukang : 0.010 Org / Hr 90,000Rp 900Rp4 Mandor : 0.015 Org / Hr 100,000Rp 1,500Rp

    24,400RpBahan + Tenaga 84,066Rp

    Plat Beton Tebal 10 cm

    Beton + Bekisting

    Plat Beton Tebal 12 cm

    Plat Beton Tebal 10 cm

    Plat Beton Tebal 12 cm

    8

  • KODEANALISA

    KEGIATAN KOEF JUMLAH HARGASATUAN HARGA SATUAN

    3 1 m Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 5 PsBahan : Harga Satuan Jumlah Harga

    1 Bata merah 5 x 11 x 22 cm : 70.000 Bh 550Rp 38,500Rp2 Semen Portland : 9.680 Kg 1,125Rp 10,890Rp3 Pasir Pasang : 0.045 M 125,000Rp 5,625Rp

    55,015RpTenaga :

    1 Pekerja : 0.300 Org / Hr 50,000Rp 15,000Rp2 Tukang Batu : 0.100 Org / Hr 70,000Rp 7,000Rp3 Kepala Tukang : 0.010 Org / Hr 90,000Rp 900Rp4 Mandor : 0.015 Org / Hr 100,000Rp 1,500Rp

    24,400RpBahan + Tenaga 79,415Rp

    5 1 Unit Septic tank dan peresapan1 Galian Tanah : 4.500 M3 40,000.00Rp 180,000.00Rp2 Pas. Batu Bata 1 : 4 : 12.000 M2 79,415.00Rp 952,980.00Rp3 Pasir Urug : 0.850 M3 120,000.00Rp 102,000.00Rp4 Kolom, Sloef dan Balok : 0.180 M3 5,447,930.80Rp 980,627.54Rp5 Urugan Kembali : 1.500 M3 13,333.33Rp 20,000.00Rp6 Plesteran : 12.000 M2 31,932.00Rp 383,184.00Rp7 Ijuk : 1.000 ls 150,000.00Rp 150,000.00Rp8 Plat Beton : 0.210 M3 4,814,950.75Rp 1,011,139.66Rp9 Pipa Penghawaan : 0.500 M' 147,650.00Rp 73,825.00Rp10 Kerikil : 0.338 M3 275,000.00Rp 92,812.50Rp11 PVC dia. 4" (D) : 5.000 M' 147,650.00Rp 738,250.00Rp

    Bahan + Tenaga 4,684,818.70RpSNI-PEK.PELESTERAN

    1 1 m Plesteran 1 Pc : 5 Ps, Tebal 15 mmBahan : Harga Satuan Jumlah Harga

    1 Semen Portland : 5.184 Kg 1,125Rp 5,832Rp2 Pasir Pasang : 0.026 M 125,000Rp 3,250Rp

    9,082RpTenaga :

    1 Pekerja : 0.200 Org / Hr 50,000Rp 10,000Rp2 Tukang Batu : 0.150 Org / Hr 70,000Rp 10,500Rp3 Kepala Tukang : 0.015 Org / Hr 90,000Rp 1,350Rp4 Mandor : 0.010 Org / Hr 100,000Rp 1,000Rp

    22,850RpBahan + Tenaga 31,932Rp

    1 1 m Plesteran 1 Pc : 3 Ps, Tebal 15 mmBahan : Harga Satuan Jumlah Harga

    1 Semen Portland : 7.776 Kg 1,125Rp 8,748Rp2 Pasir Pasang : 0.023 M 125,000Rp 2,875Rp

    11,623RpTenaga :

    1 Pekerja : 0.200 Org / Hr 50,000Rp 10,000Rp2 Tukang Batu : 0.150 Org / Hr 70,000Rp 10,500Rp3 Kepala Tukang : 0.015 Org / Hr 90,000Rp 1,350Rp4 Mandor : 0.010 Org / Hr 100,000Rp 1,000Rp

    22,850RpBahan + Tenaga 34,473Rp

    2 1 m2 Acian DindingBahan : Harga Satuan Jumlah Harga

    1 Semen Portland : 3.250 Kg 1,125Rp 3,656Rp3,656Rp

    Tenaga :1 Pekerja : 0.150 Org / Hr 50,000Rp 7,500Rp2 Tukang Batu : 0.100 Org / Hr 70,000Rp 7,000Rp3 Kepala Tukang : 0.010 Org / Hr 90,000Rp 900Rp4 Mandor : 0.008 Org / Hr 100,000Rp 800Rp

    16,200RpBahan + Tenaga 19,856Rp

    9

  • KODEANALISA

    KEGIATAN KOEF JUMLAH HARGASATUAN HARGA SATUAN

    SNI-PEK.PENGECATAN1 1 m Mengecatan Bidang Kayu Baru , 1 Lapis Cat Dasar, 2 Lapis Cat Penutup

    Bahan : Harga Satuan Jumlah Harga1 Cat Meni : 0.200 Kg 9,000Rp 1,800Rp2 Kertas Gosok : 0.500 lbr 2,500Rp 1,250Rp3 Plamir : 0.150 Kg 15,700Rp 2,355Rp4 Cat Dasar : 0.170 Kg 21,000Rp 3,570Rp5 Cat Penutup 2 Kali : 0.260 Kg 35,000Rp 9,100Rp

    18,075RpTenaga :

    1 Pekerja : 0.070 Org / Hr 50,000Rp 3,500Rp2 Tukang Cat : 0.009 Org / Hr 70,000Rp 630Rp3 Kepala Tukang : 0.006 Org / Hr 90,000Rp 540Rp4 Mandor : 0.0025 Org / Hr 100,000Rp 250Rp

    4,920RpBahan + Tenaga 22,995Rp

    2 1 m Pengecatan Tembok Dalam (1 Lapis Plamir, 1 Lapis Cat Dasar, 3 Lapis Cat Penutup) eX. Mowilex InteriorBahan : Harga Satuan Jumlah Harga

    1 Plamir : 0.100 Kg 5,000Rp 500Rp2 Kertas gosok : 0.500 lbr 2,500Rp 1,250Rp3 Cat Dasar / Undercoat Interior : 0.100 liter 39,120Rp 3,912Rp4 Cat Penutup 3 kali ( eX. Mowilex Interior) : 0.260 liter 47,280Rp 12,293Rp

    17,955RpTenaga :

    1 Pekerja : 0.020 Org / Hr 50,000Rp 1,000Rp2 Tukang Cat : 0.063 Org / Hr 70,000Rp 4,410Rp3 Kepala Tukang : 0.0063 Org / Hr 90,000Rp 567Rp4 Mandor : 0.0025 Org / Hr 100,000Rp 250Rp

    6,227RpBahan + Tenaga 24,182Rp

    3 1 m Pengecatan Tembok Luar (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup) eX. Mowilex ExteriorBahan : Harga Satuan Jumlah Harga

    1 Plamir : 0.100 Kg 5,000Rp 500Rp2 Kertas gosok : 0.500 lbr 2,500Rp 1,250Rp3 Cat Dasar / Undercoat Eksterior : 0.100 liter 39,120Rp 3,912Rp4 Cat Penutup 3 kali ( eX. Mowilex Exterior) : 0.260 liter 72,000Rp 18,720Rp

    24,382RpTenaga :

    1 Pekerja : 0.020 Org / Hr 50,000Rp 1,000Rp2 Tukang Cat : 0.063 Org / Hr 70,000Rp 4,410Rp3 Kepala Tukang : 0.0063 Org / Hr 90,000Rp 567Rp4 Mandor : 0.0025 Org / Hr 100,000Rp 250Rp

    6,227RpBahan + Tenaga 30,609Rp

    4 1 m Pengecatan Plafond dan Partisi (1 Lapis Plamir, 1 Lapis Cat Dasar,2 Lapis Cat Penutup) ex MowilexBahan : Harga Satuan Jumlah Harga

    1 Plamir : 0.100 Kg 5,000Rp 500Rp2 Kertas gosok : 0.500 lbr 2,500Rp 1,250Rp3 Cat Dasar : 0.100 ltr 12,000Rp 1,200Rp4 Cat Penutup 2 kali (eX. Mowilex Interior) : 0.260 ltr 47,280Rp 12,293Rp

    15,243RpTenaga :

    1 Pekerja : 0.020 Org / Hr 50,000Rp 1,000Rp2 Tukang Cat : 0.063 Org / Hr 70,000Rp 4,410Rp3 Kepala Tukang : 0.0063 Org / Hr 90,000Rp 567Rp4 Mandor : 0.0025 Org / Hr 100,000Rp 250Rp

    6,227RpBahan + Tenaga 21,470Rp

    10

  • KODEANALISA

    KEGIATAN KOEF JUMLAH HARGASATUAN HARGA SATUAN

    5 1 m Waterproofing ex SikaBahan : Harga Satuan Jumlah Harga

    1 Sika Waterproofing 2 x : 2.000 Kg 35,000Rp 70,000Rp70,000Rp

    Tenaga :1 Pekerja : 0.020 Org / Hr 50,000Rp 1,000Rp2 Tukang Cat : 0.063 Org / Hr 70,000Rp 4,410Rp3 Kepala Tukang : 0.0063 Org / Hr 90,000Rp 567Rp4 Mandor : 0.0025 Org / Hr 100,000Rp 250Rp

    6,227Rp

    Bahan + Tenaga 76,227Rp

    6 1 m Pengecatan Bidang Kayu dengan politurBahan : Harga Satuan Jumlah Harga

    1 Politur : 0.150 ltr 35,000Rp 5,250Rp2 Kertas gosok : 2.000 lbr 2,500Rp 5,000Rp3 Politur jadi : 0.372 ltr 40,000Rp 14,880Rp

    25,130RpTenaga :

    1 Pekerja : 0.060 Org / Hr 50,000Rp 3,000Rp2 Tukang Cat : 0.060 Org / Hr 70,000Rp 4,200Rp3 Kepala Tukang : 0.0160 Org / Hr 90,000Rp 1,440Rp4 Mandor : 0.0025 Org / Hr 100,000Rp 250Rp

    8,890RpBahan + Tenaga 34,020Rp

    SNI-PEK.LANTAI DAN DINDING

    1 1 m Pasang Lantai Keramik Warna 40 x 40 cm (polish)Bahan : Harga Satuan Jumlah Harga

    1 Keramik 40 x 40 cm - warna terang : 6.25 bh 7,714Rp 48,214Rp2 Semen Portland : 10.000 Kg 1,125Rp 11,250Rp3 Pasir Pasang : 0.045 M 125,000Rp 5,625Rp4 Semen Warna : 1.500 Kg 12,000Rp 18,000Rp

    83,089RpTenaga :

    1 Pekerja : 0.620 Org / Hr 50,000Rp 31,000Rp2 Tukang Batu : 0.350 Org / Hr 70,000Rp 24,500Rp3 Kepala Tukang : 0.035 Org / Hr 90,000Rp 3,150Rp4 Mandor : 0.030 Org / Hr 100,000Rp 3,000Rp

    61,650RpBahan + Tenaga 144,739Rp

    2 1 m Pasang Lantai Keramik Warna 30 x 30 cm (unpolish)Bahan : Harga Satuan Jumlah Harga

    1 Keramik 30 x 30 cm - warna terang : 11.11 bh 4,333Rp 48,148Rp2 Semen Portland : 10.000 Kg 1,125Rp 11,250Rp3 Pasir Pasang : 0.045 M 125,000Rp 5,625Rp4 Semen Warna : 1.500 Kg 12,000Rp 18,000Rp

    83,023RpTenaga :

    1 Pekerja : 0.620 Org / Hr 50,000Rp 31,000Rp2 Tukang Batu : 0.350 Org / Hr 70,000Rp 24,500Rp3 Kepala Tukang : 0.035 Org / Hr 90,000Rp 3,150Rp4 Mandor : 0.030 Org / Hr 100,000Rp 3,000Rp

    61,650RpBahan + Tenaga 144,673Rp

    3 1 m Pasang Lantai Keramik Warna 20 x 20 cmBahan : Harga Satuan Jumlah Harga

    1 Keramik 20 x 20 cm : 25.00 bh 1,980Rp 49,500Rp2 Semen Portland : 10.400 Kg 1,125Rp 11,700Rp3 Pasir Pasang : 0.045 M 125,000Rp 5,625Rp4 Semen Warna : 1.620 Kg 12,000Rp 19,440Rp

    86,265Rp

    11

  • KODEANALISA

    KEGIATAN KOEF JUMLAH HARGASATUAN HARGA SATUAN

    Tenaga :1 Pekerja : 0.620 Org / Hr 50,000Rp 31,000Rp2 Tukang Batu : 0.350 Org / Hr 70,000Rp 24,500Rp3 Kepala Tukang : 0.035 Org / Hr 90,000Rp 3,150Rp4 Mandor : 0.030 Org / Hr 100,000Rp 3,000Rp

    61,650RpBahan + Tenaga 147,915Rp

    4 1 m Pasang Dinding Keramik Warna 20 x 25 cmBahan : Harga Satuan Jumlah Harga

    1 Keramik 20 x 25 cm : 20.00 bh 2,450Rp 49,000Rp2 Semen Portland : 9.300 Kg 1,125Rp 10,463Rp3 Pasir Pasang : 0.018 M 125,000Rp 2,250Rp4 Semen Warna : 1.940 Kg 12,000Rp 23,280Rp

    84,993RpTenaga :

    1 Pekerja : 0.600 Org / Hr 50,000Rp 30,000Rp2 Tukang Batu : 0.450 Org / Hr 70,000Rp 31,500Rp3 Kepala Tukang : 0.045 Org / Hr 90,000Rp 4,050Rp4 Mandor : 0.030 Org / Hr 100,000Rp 3,000Rp

    68,550RpBahan + Tenaga 153,543Rp

    6 1 m' Pasang Stepnosing 10 x 30 cmBahan : Harga Satuan Jumlah Harga

    1 Stepnosing : 3.33 bh 35,000Rp 116,667Rp2 Semen Portland : 1.140 Kg 1,125Rp 1,283Rp3 Pasir Pasang : 0.003 M 125,000Rp 375Rp4 Semen Warna : 0.100 Kg 12,000Rp 1,200Rp

    119,524RpTenaga :

    1 Pekerja : 0.090 Org / Hr 50,000Rp 4,500Rp2 Tukang Batu : 0.090 Org / Hr 70,000Rp 6,300Rp3 Kepala Tukang : 0.009 Org / Hr 90,000Rp 810Rp4 Mandor : 0.005 Org / Hr 100,000Rp 500Rp

    12,110RpBahan + Tenaga 131,634Rp

    7 Pasang 1 m2 Granit 60 x 60 cmBahan : Harga Satuan Jumlah Harga

    1 Granit 60x60 cm Ex. Cina : 3.19 bh 56,250Rp 179,688Rp2 Semen Portland : 8.190 Kg 1,125Rp 9,214Rp3 Pasir Pasang : 0.045 M 125,000Rp 5,625Rp4 Semen Warna : 0.650 Kg 12,000Rp 7,800Rp

    202,326RpTenaga :

    1 Pekerja : 0.620 Org / Hr 50,000Rp 31,000Rp2 Tukang Batu : 0.350 Org / Hr 70,000Rp 24,500Rp3 Kepala Tukang : 0.035 Org / Hr 90,000Rp 3,150Rp4 Mandor : 0.030 Org / Hr 100,000Rp 3,000Rp

    61,650RpBahan + Tenaga 263,976Rp

    8 Pasang 1 m2 Dinding Granit 30 x 30 cmBahan : Harga Satuan Jumlah Harga

    1 Granit 30x30 cm : 12.22 bh 20,000Rp 244,444Rp2 Semen Portland : 8.190 Kg 1,125Rp 9,214Rp3 Pasir Pasang : 0.045 M 125,000Rp 5,625Rp4 Semen Warna : 0.650 Kg 12,000Rp 7,800Rp

    267,083RpTenaga :

    1 Pekerja : 0.620 Org / Hr 50,000Rp 31,000Rp2 Tukang Batu : 0.350 Org / Hr 70,000Rp 24,500Rp3 Kepala Tukang : 0.035 Org / Hr 90,000Rp 3,150Rp4 Mandor : 0.030 Org / Hr 100,000Rp 3,000Rp

    61,650RpBahan + Tenaga 328,733Rp

    12

  • KODEANALISA

    KEGIATAN KOEF JUMLAH HARGASATUAN HARGA SATUAN

    8 Pasang 1 m2 Dinding Batu Alam AndesitBahan : Harga Satuan Jumlah Harga

    1 Batu Alam Andesit 15x30 cm : 1.10 m2 180,000Rp 198,000Rp2 Semen Portland : 11.750 Kg 1,125Rp 13,219Rp3 Pasir Pasang : 0.035 M 125,000Rp 4,375Rp

    215,594RpTenaga :

    1 Pekerja : 0.620 Org / Hr 50,000Rp 31,000Rp2 Tukang Batu : 0.350 Org / Hr 70,000Rp 24,500Rp3 Kepala Tukang : 0.035 Org / Hr 90,000Rp 3,150Rp4 Mandor : 0.030 Org / Hr 100,000Rp 3,000Rp

    61,650RpBahan + Tenaga 277,244Rp

    8 Pasang 1 m2 Dinding Batu Alam Cirebon tdk BeraturanBahan : Harga Satuan Jumlah Harga

    1 Batu Alam Cirebon tidak Beraturan : 1.10 m2 85,000Rp 93,500Rp2 Semen Portland : 11.750 Kg 1,125Rp 13,219Rp3 Pasir Pasang : 0.035 M 125,000Rp 4,375Rp

    111,094RpTenaga :

    1 Pekerja : 0.620 Org / Hr 50,000Rp 31,000Rp2 Tukang Batu : 0.350 Org / Hr 70,000Rp 24,500Rp3 Kepala Tukang : 0.035 Org / Hr 90,000Rp 3,150Rp4 Mandor : 0.030 Org / Hr 100,000Rp 3,000Rp

    61,650RpBahan + Tenaga 172,744Rp

    SNI-PEK.SANITASI1 Memasang Kloset duduk

    Bahan : Harga Satuan Jumlah Harga1 Kloset Duduk Toto CW 867 NJ + THX 20 NCR = 1.000 bh 2,200,000Rp 2,200,000Rp

    Kloset Duduk Toto CW 660 J + THX 20 NCR = 1.000 bh 1,850,000Rp 1,850,000Rp2 Perlengkapan Toto CW 867 NJ + THX 20 NCR = 6% Harga 2,200,000Rp 132,000Rp

    Perlengkapan Toto CW 660 J + THX 20 NCR = 6% Harga 1,850,000Rp 111,000RpKloset Duduk Toto CW 867 NJ + THX 20 NCR 2,332,000RpKloset Duduk Toto CW 660 J + THX 20 NCR 1,961,000Rp

    Tenaga :1 Pekerja = 3.300 Org / Hr 50,000Rp 165,000Rp2 Tukang Pipa = 1.100 Org / Hr 70,000Rp 77,000Rp3 Kepala Tukang = 0.110 Org / Hr 90,000Rp 9,900Rp4 Mandor = 0.1600 Org / Hr 100,000Rp 16,000Rp

    267,900RpKloset Duduk Toto CW 867 NJ + THX 20 NCRBahan + Tenaga 2,599,900RpKloset Duduk Toto CW 660 J + THX 20 NCRBahan + Tenaga 2,228,900Rp

    4 Memasang WastafelBahan : Harga Satuan Jumlah Harga

    1 Wastafel = 1.000 bh 850,000Rp 850,000Rp2 Semen = 6.00 kg 1,125Rp 6,750Rp3 Pasir Pasang = 0.01 m3 125,000Rp 1,250Rp

    858,000RpTenaga :

    1 Pekerja = 1.200 Org / Hr 50,000Rp 60,000Rp2 Tukang Pipa = 1.450 Org / Hr 70,000Rp 101,500Rp3 Kepala Tukang = 0.145 Org / Hr 90,000Rp 13,050Rp4 Mandor = 0.1000 Org / Hr 100,000Rp 10,000Rp

    184,550RpBahan + Tenaga 1,042,550Rp

    13

  • KODEANALISA

    KEGIATAN KOEF JUMLAH HARGASATUAN HARGA SATUAN

    6 Memasang 1 M' Pipa PVC Tipe AW Diameter 1/2"Bahan : Harga Satuan Jumlah Harga

    1 Pipa PVC = 1.200 M' 6,600Rp 7,920Rp2 Perlengkapan = 35% Harga Pipa 6,600Rp 2,310Rp

    10,230RpTenaga :

    1 Pekerja = 0.036 Org / Hr 50,000Rp 1,800Rp2 Tukang Pipa = 0.060 Org / Hr 70,000Rp 4,200Rp3 Kepala Tukang = 0.006 Org / Hr 90,000Rp 540Rp4 Mandor = 0.0018 Org / Hr 100,000Rp 180Rp

    6,720RpBahan + Tenaga 16,950Rp

    7 Memasang 1 M' Pipa PVC Tipe AW Diameter "Bahan : Harga Satuan Jumlah Harga

    1 Pipa PVC = 1.200 M' 5,400Rp 6,480Rp2 Perlengkapan = 35% Harga Pipa 5,400Rp 1,890Rp

    8,370RpTenaga :

    1 Pekerja = 0.036 Org / Hr 50,000Rp 1,800Rp2 Tukang Pipa = 0.060 Org / Hr 70,000Rp 4,200Rp3 Kepala Tukang = 0.006 Org / Hr 90,000Rp 540Rp4 Mandor = 0.0018 Org / Hr 100,000Rp 180Rp

    6,720RpBahan + Tenaga 15,090Rp

    8 Memasang 1 M' Pipa PVC Tipe AW Diameter 1"Bahan : Harga Satuan Jumlah Harga

    1 Pipa PVC = 1.200 M' 7,100Rp 8,520Rp2 Perlengkapan = 35% Harga Pipa 7,100Rp 2,485Rp

    11,005RpTenaga :

    1 Pekerja = 0.036 Org / Hr 50,000Rp 1,800Rp2 Tukang Pipa = 0.060 Org / Hr 70,000Rp 4,200Rp3 Kepala Tukang = 0.006 Org / Hr 90,000Rp 540Rp4 Mandor = 0.0018 Org / Hr 100,000Rp 180Rp

    6,720RpBahan + Tenaga 17,725Rp

    9 Memasang 1 M' Pipa PVC Tipe AW Diameter 2"Bahan : Harga Satuan Jumlah Harga

    1 Pipa PVC = 1.200 M' 22,800Rp 27,360Rp2 Perlengkapan = 35% Harga Pipa 22,800Rp 7,980Rp

    35,340RpTenaga :

    1 Pekerja = 0.054 Org / Hr 50,000Rp 2,700Rp2 Tukang Pipa = 0.090 Org / Hr 70,000Rp 6,300Rp3 Kepala Tukang = 0.009 Org / Hr 90,000Rp 810Rp4 Mandor = 0.0027 Org / Hr 100,000Rp 270Rp

    10,080RpBahan + Tenaga 45,420Rp

    9 Memasang 1 M' Pipa PVC Tipe AW Diameter 3"Bahan : Harga Satuan Jumlah Harga

    1 Pipa PVC = 1.200 M' 85,500Rp 102,600Rp2 Perlengkapan = 35% Harga Pipa 85,500Rp 29,925Rp

    132,525RpTenaga :

    1 Pembantu Tukang = 0.081 Org / Hr 50,000Rp 4,050Rp2 Tukang Pipa = 0.135 Org / Hr 70,000Rp 9,450Rp3 Kepala Tukang = 0.0135 Org / Hr 90,000Rp 1,215Rp4 Mandor = 0.0041 Org / Hr 100,000Rp 410Rp

    15,125RpBahan + Tenaga 147,650Rp

    14

  • KODEANALISA

    KEGIATAN KOEF JUMLAH HARGASATUAN HARGA SATUAN

    10 Memasang 1 M' Pipa PVC Tipe AW Diameter 4"Bahan : Harga Satuan Jumlah Harga

    1 Pipa PVC = 1.200 M' 111,600Rp 133,920Rp2 Perlengkapan = 35% Harga Pipa 111,600Rp 39,060Rp

    172,980RpTenaga :

    1 Pekerja = 0.081 Org / Hr 50,000Rp 4,050Rp2 Tukang Pipa = 0.135 Org / Hr 70,000Rp 9,450Rp3 Kepala Tukang = 0.0135 Org / Hr 90,000Rp 1,215Rp4 Mandor = 0.0041 Org / Hr 100,000Rp 410Rp

    15,125RpBahan + Tenaga 188,105Rp

    12 Memasang 1 Buah Kran Diameter " atau "Bahan : Harga Satuan Jumlah Harga

    1 Kran Air = 1.000 Bh 35,000Rp 35,000Rp2 Seal Tape = 0.035 Bh 5,000Rp 175Rp

    35,175RpTenaga :

    1 Pekerja = 0.010 Org / Hr 50,000Rp 500Rp2 Tukang Batu = 0.100 Org / Hr 70,000Rp 7,000Rp3 Kepala Tukang = 0.010 Org / Hr 90,000Rp 900Rp4 Mandor = 0.005 Org / Hr 100,000Rp 500Rp

    8,900RpBahan + Tenaga 44,075Rp

    13 Memasang 1 set ShowerBahan : Harga Satuan Jumlah Harga

    1 Shower + Kran = 1.000 set 320,000Rp 320,000Rp2 Seal Tape = 0.035 Bh 5,000Rp 175Rp

    320,175RpTenaga :

    1 Pekerja = 0.010 Org / Hr 50,000Rp 500Rp2 Tukang Batu = 0.100 Org / Hr 70,000Rp 7,000Rp3 Kepala Tukang = 0.010 Org / Hr 90,000Rp 900Rp4 Mandor = 0.005 Org / Hr 100,000Rp 500Rp

    8,900RpBahan + Tenaga 329,075Rp

    14 Memasang 1 Buah Floor DrainBahan : Harga Satuan Jumlah Harga

    1 Floor Drain = 1.000 Bh 65,000Rp 65,000Rp65,000Rp

    Tenaga :1 Pekerja = 0.010 Org / Hr 50,000Rp 500Rp2 Tukang Batu = 0.100 Org / Hr 70,000Rp 7,000Rp3 Kepala Tukang = 0.010 Org / Hr 90,000Rp 900Rp4 Mandor = 0.005 Org / Hr 100,000Rp 500Rp

    8,900RpBahan + Tenaga 73,900Rp

    SNI - RANGKA LANGIT-LANGIT/PARTISI1 1 m Rangka Plafond Hollow

    Bahan Harga Satuan Jumlah Harga1 Hollow 4x4 cm = 0.920 btg 24,000Rp 22,080Rp2 Hollow 2x4 cm = 0.920 btg 22,000Rp 20,240Rp3 Ramsel Nails = 1.500 bh 4,000Rp 6,000Rp4 Srew/Sekrup = 11.000 bh 74Rp 814Rp5 Wall Angle = 0.200 btg 16,500Rp 3,300Rp

    52,434RpTenaga

    1 Pekerja = 0.070 Org / Hr 50,000Rp 3,500Rp2 Tukang Kayu = 0.700 Org / Hr 70,000Rp 49,000Rp3 Kepala Tukang = 0.070 Org / Hr 90,000Rp 6,300Rp4 Mandor = 0.0120 Org / Hr 100,000Rp 1,200Rp

    60,000RpBahan + Tenaga 112,434Rp

    15

  • KODEANALISA

    KEGIATAN KOEF JUMLAH HARGASATUAN HARGA SATUAN

    2 1 m Langit-langit Gypsum (122 x 244) cm, Tebal 9 mmBahan : Harga Satuan Jumlah Harga

    1 Gypsum = 0.364 Lbr 55,000Rp 20,020Rp2 Drywall Screw = 0.040 dos 65,000Rp 2,600Rp3 Cornice Adhesive = 0.034 zak 65,000Rp 2,210Rp4 Cotton Tape = 0.052 roll 20,000Rp 1,040Rp

    25,870RpTenaga :

    1 Pekerja = 0.100 Org / Hr 50,000Rp 5,000Rp2 Tukang Kayu = 0.050 Org / Hr 70,000Rp 3,500Rp3 Kepala Tukang = 0.005 Org / Hr 90,000Rp 450Rp4 Mandor = 0.0050 Org / Hr 100,000Rp 500Rp

    9,450RpBahan + Tenaga 35,320Rp

    4 1 m' List Profil GypsumBahan : Harga Satuan Jumlah Harga

    1 List Profil = 1.100 M 17,500Rp 19,250Rp2 Perekat = 0.010 Kg 17,500Rp 175Rp

    19,425RpTenaga :

    1 Pekerja = 0.050 Org / Hr 50,000Rp 2,500Rp2 Tukang Kayu = 0.050 Org / Hr 70,000Rp 3,500Rp3 Kepala Tukang = 0.005 Org / Hr 90,000Rp 450Rp4 Mandor = 0.003 Org / Hr 100,000Rp 300Rp

    6,750RpBahan + Tenaga 26,175Rp

    5 1 m' List Profil/Plint KayuBahan : Harga Satuan Jumlah Harga

    1 List Profil Kayu 10 cm = 1.100 M 30,000Rp 33,000Rp2 Paku = 0.010 Kg 17,000Rp 170Rp

    33,170RpTenaga :

    1 Pekerja = 0.050 Org / Hr 50,000Rp 2,500Rp2 Tukang Kayu = 0.050 Org / Hr 70,000Rp 3,500Rp3 Kepala Tukang = 0.005 Org / Hr 90,000Rp 450Rp4 Mandor = 0.003 Org / Hr 100,000Rp 300Rp

    6,750RpBahan + Tenaga 39,920Rp

    6 1 m Dinding Partisi Pemisah Gypsum Rangkap, Rangka Metal studBahan Harga Satuan Jumlah Harga

    1 Wall track = 0.660 btg 35,000Rp 23,100Rp2 Wall stud = 1.710 btg 25,000Rp 42,750Rp3 Paku Sekrup = 40.000 pcs 74Rp 2,960Rp4 Gypsum = 0.728 Lbr 55,000Rp 40,040Rp5 Drywall Screw = 0.080 dos 65,000Rp 5,200Rp6 Cornice Adhesive = 0.068 zak 65,000Rp 4,420Rp7 Cotton Tape = 0.104 roll 20,000Rp 2,080Rp

    120,550RpTenaga

    1 Pekerja = 0.200 Org / Hr 50,000Rp 10,000Rp2 Tukang Kayu = 0.600 Org / Hr 70,000Rp 42,000Rp3 Kepala Tukang = 0.060 Org / Hr 90,000Rp 5,400Rp4 Mandor = 0.0100 Org / Hr 100,000Rp 1,000Rp

    58,400RpBahan + Tenaga 178,950Rp

    SNI-ATAP1 1 m Pasang Atap Zincalum / Spandec Warna

    Bahan : Harga Satuan Jumlah Harga1 Zincalum / Spandec Warna : 1.050 M2 150,000Rp 157,500Rp2 Sekrup : 12.000 pcs 600Rp 7,200Rp

    164,700RpTenaga :

    1 Pekerja : 0.200 Org / Hr 50,000Rp 10,000Rp2 Tukang Kayu : 0.100 Org / Hr 70,000Rp 7,000Rp3 Kepala Tukang : 0.010 Org / Hr 90,000Rp 900Rp4 Mandor : 0.001 Org / Hr 100,000Rp 100Rp

    18,000RpBahan + Tenaga 182,700Rp

    2 1 m' Pasang Nok Zincalum WarnaBahan : Harga Satuan Jumlah Harga

    1 Plat Nok Zincalum : 1.100 m' 45,000Rp 49,500Rp2 Sekrup : 8.000 pcs 600Rp 4,800Rp

    16

  • KODEANALISA

    KEGIATAN KOEF JUMLAH HARGASATUAN HARGA SATUAN

    54,300RpTenaga :

    1 Pekerja : 0.250 Org / Hr 50,000Rp 12,500Rp2 Tukang Kayu : 0.150 Org / Hr 70,000Rp 10,500Rp3 Kepala Tukang : 0.015 Org / Hr 90,000Rp 1,350Rp4 Mandor : 0.013 Org / Hr 100,000Rp 1,300Rp

    25,650RpBahan + Tenaga 79,950Rp

    5 1 m' Pasang Lisplang Ukuran 2/30 cm, WoodplankBahan : Harga Satuan Jumlah Harga

    1 Woodplank : 2.1000 M 17,000Rp 35,700Rp2 Sekrup : 8.000 pcs 600Rp 4,800Rp

    40,500RpTenaga :

    1 Pekerja : 0.150 Org / Hr 50,000Rp 7,500Rp2 Tukang Kayu : 0.250 Org / Hr 70,000Rp 17,500Rp3 Kepala Tukang : 0.025 Org / Hr 90,000Rp 2,250Rp4 Mandor : 0.075 Org / Hr 100,000Rp 7,500Rp

    34,750RpBahan + Tenaga 75,250Rp

    V. SNI-PEK.KUNCI DAN KACA1 1 Buah Pasang Kunci Tanam Biasa

    Bahan : Harga Satuan Jumlah Harga1 Kunci Tanaman Biasa = 1.000 Bh 306,000Rp 306,000Rp

    306,000RpTenaga :

    1 Pekerja = 0.010 Org / Hr 50,000Rp 500Rp2 Tukang Kayu = 0.500 Org / Hr 70,000Rp 35,000Rp3 Kepala Tukang = 0.010 Org / Hr 90,000Rp 900Rp4 Mandor = 0.005 Org / Hr 100,000Rp 500Rp

    36,900RpBahan + Tenaga 342,900Rp

    2 1 Buah Pasang Engsel PintuBahan : Harga Satuan Jumlah Harga

    1 Engsel Pintu = 1.000 Bh 30,000Rp 30,000Rp30,000Rp

    Tenaga :1 Pekerja = 0.015 Org / Hr 50,000Rp 750Rp2 Tukang Kayu = 0.150 Org / Hr 70,000Rp 10,500Rp3 Kepala Tukang = 0.015 Org / Hr 90,000Rp 1,350Rp4 Mandor = 0.00075 Org / Hr 100,000Rp 75Rp

    12,675RpBahan + Tenaga 42,675Rp

    SNI-ALUMINIUM1 1 M Pasang Kaca, Tebal 5 mm

    Bahan : Harga Satuan Jumlah Harga1 Kaca = 1.100 M 285,000Rp 313,500Rp

    313,500RpTenaga :

    1 Pekerja = 0.015 Org / Hr 50,000Rp 750Rp2 Tukang Kayu = 0.150 Org / Hr 70,000Rp 10,500Rp3 Kepala Tukang = 0.015 Org / Hr 90,000Rp 1,350Rp4 Mandor = 0.00075 Org / Hr 100,000Rp 75Rp

    12,675RpBahan + Tenaga 326,175Rp

    17

  • KODEANALISA

    KEGIATAN KOEF JUMLAH HARGASATUAN HARGA SATUAN

    2 1 M Pasang Kaca, Tebal Buram 5 mmBahan : Harga Satuan Jumlah Harga

    1 Kaca = 1.050 M 165,000Rp 173,250Rp173,250Rp

    Tenaga :1 Pekerja = 0.015 Org / Hr 50,000Rp 750Rp2 Tukang Kayu = 0.150 Org / Hr 70,000Rp 10,500Rp3 Kepala Tukang = 0.015 Org / Hr 90,000Rp 1,350Rp4 Mandor = 0.00075 Org / Hr 100,000Rp 75Rp

    12,675RpBahan + Tenaga 185,925Rp

    3 1 m Pasang Kaca Mati 12 mmBahan : Harga Satuan Jumlah Harga

    1 Kaca Tempered 12 mm : 1.100 M2 650,000Rp 715,000Rp2 Sealant : 0.200 kg 35,000Rp 7,000Rp

    722,000RpTenaga :

    1 Pekerja : 0.025 Org / Hr 50,000Rp 1,250Rp2 Tukang Kayu : 0.250 Org / Hr 70,000Rp 17,500Rp3 Kepala Tukang : 0.025 Org / Hr 90,000Rp 2,250Rp4 Mandor : 0.001 Org / Hr 100,000Rp 125Rp

    21,125RpBahan + Tenaga 743,125Rp

    4 1 m Pasang Kaca Mati 5 mmBahan : Harga Satuan Jumlah Harga

    1 Kaca Panasap Green (Kaca Hijau) 5 mm : 1.100 M2 285,000Rp 313,500Rp2 Sealant : 0.050 kg 35,000Rp 1,750Rp

    315,250RpTenaga :

    1 Pekerja : 0.025 Org / Hr 50,000Rp 1,250Rp2 Tukang Kayu : 0.250 Org / Hr 70,000Rp 17,500Rp3 Kepala Tukang : 0.025 Org / Hr 90,000Rp 2,250Rp4 Mandor : 0.001 Org / Hr 100,000Rp 125Rp

    21,125RpBahan + Tenaga 336,375Rp

    5 10 m1 Pasang Kusen Aluminium 4" x 1 1/2 (alexindo)Bahan : Harga Satuan Jumlah Harga

    1 Aluminium 4" x 1 1/2 (alexindo) : 10.500 M1 95,000.00Rp 997,500Rp2 Alat Bantu + Perlengkapan : 0.250 95,000Rp 23,750Rp

    1,021,250RpTenaga :

    1 Pekerja : 0.860 Org / Hr 50,000Rp 43,000Rp2 Tukang Besi : 0.860 Org / Hr 70,000Rp 60,200Rp3 Kepala Tukang : 0.086 Org / Hr 90,000Rp 7,740Rp4 Mandor : 0.042 Org / Hr 100,000Rp 4,200Rp

    115,140RpBahan + Tenaga : 10 m1 1,136,390RpBahan + Tenaga : 1 m1 113,639Rp

    6 10 m1 Pasang Daun Pintu dan jendela AluminiumBahan : Harga Satuan Jumlah Harga

    1 Bingkai Pintu & Jendela Aluminium : 10.500 M1 85,000.00Rp 892,500Rp2 Alat Bantu + Perlengkapan : 0.250 85,000Rp 21,250Rp

    913,750RpTenaga :

    1 Pekerja : 0.900 Org / Hr 50,000Rp 45,000Rp2 Tukang Besi : 2.200 Org / Hr 70,000Rp 154,000Rp3 Kepala Tukang : 0.220 Org / Hr 90,000Rp 19,800Rp4 Mandor : 0.090 Org / Hr 100,000Rp 9,000Rp

    227,800RpBahan + Tenaga : 10 m1 1,141,550RpBahan + Tenaga : 1 m1 114,155Rp

    7 1 Unit Pasang Jendela Aluminium J11 Kusen Aluminium 4" x 1 1/2 (alexindo) Warna Coklat: 6.0200 m' 113,639.00Rp 684,106.78Rp2 Kaca Panasap Green (Kaca Hijau) 5 mm : 3.5200 m2 336,375.00Rp 1,184,040.00Rp3 Sticker Kaca : 1.408 m2 75,000.00Rp 105,600.00Rp

    Jumlah 1,973,746.78

    18

  • KODEANALISA

    KEGIATAN KOEF JUMLAH HARGASATUAN HARGA SATUAN

    8 1 Unit Pasang Jendela Aluminium J21 Kusen Aluminium 4" x 1 1/2 (alexindo) Warna Coklat: 12.3300 m' 113,639.00Rp 1,401,168.87Rp2 Kaca Panasap Green (Kaca Hijau) 5 mm : 3.7000 m2 336,375.00Rp 1,244,587.50Rp3 Sticker Kaca : 1.480 m2 75,000.00Rp 111,000.00Rp

    Jumlah 2,756,756.379 1 Unit Pasang Jendela Aluminium J3

    1 Kusen Aluminium 4" x 1 1/2 (alexindo) Warna Coklat: 10.3800 m' 113,639.00Rp 1,179,572.82Rp2 Bingkai Jendela Aluminium : 6.9600 m' 114,155.00Rp 794,518.80Rp3 Kaca Panasap Green (Kaca Hijau) 5 mm : 2.2000 m2 336,375.00Rp 740,025.00Rp4 Sticker Kaca : 0.880 m2 75,000.00Rp 66,000.00Rp

    Jumlah 2,780,116.6210 1 Unit Pasang Jendela Aluminium V1

    1 Kusen Aluminium 4" x 1 1/2 (alexindo) Warna Coklat: 2.2600 m' 113,639.00Rp 256,824.14Rp2 Bingkai Jendela Aluminium : 1.9400 m' 114,155.00Rp 221,460.70Rp3 Kaca Panasap Green (Kaca Hijau) 5 mm : 0.2300 m2 336,375.00Rp 77,366.25Rp4 Sticker Kaca : 0.092 m2 75,000.00Rp 6,900.00Rp

    Jumlah 562,551.0911 1 Unit Pasang Jendela Aluminium J4

    1 Kusen Aluminium 4" x 1 1/2 (alexindo) Warna Coklat: 10.8000 m' 113,639.00Rp 1,227,301.20Rp2 Bingkai Jendela Aluminium : 8.0800 m' 114,155.00Rp 922,372.40Rp3 Kaca Panasap Green (Kaca Hijau) 5 mm : 2.4600 m2 336,375.00Rp 827,482.50Rp4 Sticker Kaca : 0.984 m2 75,000.00Rp 73,800.00Rp

    Jumlah 3,050,956.1012 1 Unit Pasang Jendela Aluminium J5

    1 Kusen Aluminium 4" x 1 1/2 (alexindo) Warna Coklat: 5.4000 m' 113,639.00Rp 613,650.60Rp2 Kaca Panasap Green (Kaca Hijau) 5 mm : 0.8500 m2 336,375.00Rp 285,918.75Rp3 Sticker Kaca : 0.340 m2 75,000.00Rp 25,500.00Rp

    Jumlah 925,069.3512 1 Unit Pasang Jendela Aluminium J6

    1 Kusen Aluminium 4" x 1 1/2 (alexindo) Warna Coklat: 16.3400 m' 113,639.00Rp 1,856,861.26Rp2 Kaca Panasap Green (Kaca Hijau) 5 mm : 2.7600 m2 336,375.00Rp 928,395.00Rp3 Sticker Kaca : 1.104 m2 75,000.00Rp 82,800.00Rp

    Jumlah 2,868,056.269 1 Unit Pasang Jendela Aluminium J7

    1 Kusen Aluminium 4" x 1 1/2 (alexindo) Warna Coklat: 18.9000 m' 113,639.00Rp 2,147,777.10Rp2 Bingkai Jendela Aluminium : 7.1400 m' 114,155.00Rp 815,066.70Rp3 Kaca Panasap Green (Kaca Hijau) 5 mm : 3.4400 m2 336,375.00Rp 1,157,130.00Rp4 Sticker Kaca : 1.376 m2 75,000.00Rp 103,200.00Rp

    Jumlah 4,223,173.809 1 Unit Pasang Jendela Aluminium J8

    1 Kusen Aluminium 4" x 1 1/2 (alexindo) Warna Coklat: 18.5400 m' 113,639.00Rp 2,106,867.06Rp2 Bingkai Jendela Aluminium : 7.6600 m' 114,155.00Rp 874,427.30Rp3 Kaca Panasap Green (Kaca Hijau) 5 mm : 4.6000 m2 336,375.00Rp 1,547,325.00Rp4 Sticker Kaca : 1.840 m2 75,000.00Rp 138,000.00Rp

    Jumlah 4,666,619.3613 1 Unit Pasang Pintu Aluminium Kaca P3

    1 Kusen Aluminium 4" x 1 1/2 (alexindo) Warna Coklat: 6.9400 m' 113,639.00Rp 788,654.66Rp2 Bingkai Pintu Aluminium : 6.3600 m' 114,155.00Rp 726,025.80Rp3 Kaca Panasap Green (Kaca Hijau) 5 mm : 1.6200 m2 336,375.00Rp 544,927.50Rp4 Sticker Kaca : 0.648 m2 75,000.00Rp 48,600.00Rp

    Jumlah 2,108,207.9613 1 Unit Pasang Pintu Aluminium Kaca PJ

    1 Kusen Aluminium 4" x 1 1/2 (alexindo) Warna Coklat: 20.2400 m' 113,639.00Rp 2,300,053.36Rp2 Bingkai Pintu Aluminium : 6.3600 m' 114,155.00Rp 726,025.80Rp3 Kaca Panasap Green (Kaca Hijau) 5 mm : 6.1200 m2 336,375.00Rp 2,058,615.00Rp4 Sticker Kaca : 2.448 m2 75,000.00Rp 183,600.00Rp

    Jumlah 5,268,294.16

    19

  • KODEANALISA

    KEGIATAN KOEF JUMLAH HARGASATUAN HARGA SATUAN

    13 Pasang 1 bh Kunci Pintu AluminiumBahan

    1 Kunci Pintu Aluminium : 1.0000 bh 100,000.00Rp 100,000.00Rp100,000Rp

    Tenaga1 Pekerja : 0.0050 Org / Hr 50,000.00Rp 250.00Rp2 Tukang Kayu : 0.2500 Org / Hr 70,000.00Rp 17,500.00Rp3 Kepala tukang : 0.0050 Org / Hr 90,000.00Rp 450.00Rp4 Mandor : 0.0025 Org / Hr 100,000.00Rp 250.00Rp

    18,450RpBahan + Tenaga 118,450.00Rp

    13 Membuat dan memasang 1m3 kusen pintu dan kusen jendela, kayu kelas IBahan

    1 Balok Kayu Kls - I : 1.1000 m3 9,500,000.00Rp 10,450,000.00Rp2 Paku 10 cm : 1.2500 Kg 17,000.00Rp 21,250.00Rp3 Lem kayu : 1.0000 Kg 45,000Rp 45,000.00Rp

    10,516,250RpTenaga

    1 Pekerja : 6.0000 Org / Hr 50,000.00Rp 300,000.00Rp2 Tukang Kayu : 20.0000 Org / Hr 70,000.00Rp 1,400,000.00Rp3 Kepala tukang : 2.0000 Org / Hr 90,000.00Rp 180,000.00Rp4 Mandor : 0.3000 Org / Hr 100,000.00Rp 30,000.00Rp

    1,910,000RpBahan + Tenaga 12,426,250.00Rp

    13 Membuat dan memasang 1m2 daun pintu panil, kayu kelas IBahan

    1 Balok Kayu Kls - I : 0.0400 m3 10,000,000.00Rp 400,000.00Rp2 Lem kayu : 0.5000 Kg 45,000Rp 22,500.00Rp

    422,500RpTenaga

    1 Pekerja : 1.0000 Org / Hr 50,000.00Rp 50,000.00Rp2 Tukang Kayu : 2.5000 Org / Hr 70,000.00Rp 175,000.00Rp3 Kepala tukang : 0.2500 Org / Hr 90,000.00Rp 22,500.00Rp4 Mandor : 0.0500 Org / Hr 100,000.00Rp 5,000.00Rp

    252,500RpBahan + Tenaga 675,000.00Rp

    13 Pasang 1 bh Kunci Tanam Kamar MandiBahan

    1 Kunci Tanam Kamar Mandi : 1.0000 bh 143,750.00Rp 143,750.00Rp143,750Rp

    Tenaga1 Pekerja : 0.0050 Org / Hr 50,000.00Rp 250.00Rp2 Tukang Kayu : 0.5000 Org / Hr 70,000.00Rp 35,000.00Rp3 Kepala tukang : 0.0050 Org / Hr 90,000.00Rp 450.00Rp4 Mandor : 0.0025 Org / Hr 100,000.00Rp 250.00Rp

    35,950RpBahan + Tenaga 179,700.00Rp

    13 Pasang 1 bh Engsel Pintu PanilBahan

    1 Engsel Pintu : 1.0000 bh 30,000.00Rp 30,000.00Rp30,000Rp

    Tenaga1 Pekerja : 0.0150 Org / Hr 50,000.00Rp 750.00Rp2 Tukang Kayu : 0.1500 Org / Hr 70,000.00Rp 10,500.00Rp3 Kepala tukang : 0.0150 Org / Hr 90,000.00Rp 1,350.00Rp4 Mandor : 0.0008 Org / Hr 100,000.00Rp 75.00Rp

    12,675RpBahan + Tenaga 42,675.00Rp

    20

  • KODEANALISA

    KEGIATAN KOEF JUMLAH HARGASATUAN HARGA SATUAN

    14 1 unit Pintu Kaca Tempered 12 mm FramelessBahan : Harga Satuan Jumlah Harga

    1 Kaca 12 mm : 3.360 M2 743,125Rp 2,496,900Rp2 Top and bottom patch : 2.000 unit 1,750,000Rp 3,500,000Rp3 Floor Hindge and Patch Lock : 2.000 unit 1,750,000Rp 3,500,000Rp3 Handle Pintu : 2.000 unit 600,000Rp 1,200,000Rp

    10,696,900RpTenaga :

    1 Upah pemasangan pintu : 1.000 ls 2,000,000Rp 2,000,000Rp2,000,000Rp

    Bahan + Tenaga 12,696,900Rp

    SNI PEKERJAAN ELEKTRIKAL1 1 ttk Instalasi Penerangan

    Bahan : Harga Satuan Jumlah Harga1 Kabel NYM 3 x 2.5 mm = 7.500 m' 7,500Rp 56,250Rp2 Klem Kabel No. 10 = 3.600 btg 500Rp 1,800Rp3 Pipa PVC 5/8" = 3.600 btg 12,000Rp 43,200Rp4 Inbow Dos = 3.600 btg 3,500Rp 12,600Rp5 Las Dop = 3.600 btg 500Rp 1,800Rp6 T- Dos 5/8" = 1.000 pcs 500Rp 500Rp7 Isolasi = 0.750 roll 7,000Rp 5,250Rp8 Alat Bantu = 1.000 ls 2,000Rp 2,000Rp

    123,400RpTenaga :

    1 Pekerja = 0.250 Org / Hr 50,000Rp 12,500Rp2 Tukang Listrik = 0.400 Org / Hr 80,000Rp 32,000Rp3 Kepala Tukang = 0.040 Org / Hr 90,000Rp 3,600Rp4 Mandor = 0.0200 Org / Hr 100,000Rp 2,000Rp

    50,100RpBahan + Tenaga 173,500Rp

    2 1 ttk Instalasi Stop KontakBahan : Harga Satuan Jumlah Harga

    1 Kabel NYM 3 x 2.5 mm = 10.000 m' 7,500Rp 75,000Rp2 Klem Kabel No. 10 = 3.600 btg 500Rp 1,800Rp3 Pipa PVC 5/8" = 3.600 btg 12,000Rp 43,200Rp4 Inbow Dos = 3.600 btg 3,500Rp 12,600Rp5 Las Dop = 3.600 btg 500Rp 1,800Rp6 T- Dos 5/8" = 1.000 pcs 500Rp 500Rp7 Isolasi = 0.750 roll 7,000Rp 5,250Rp8 Alat Bantu = 1.000 ls 2,000Rp 2,000Rp

    142,150RpTenaga :

    1 Pekerja = 0.250 Org / Hr 50,000Rp 12,500Rp2 Tukang Listrik = 0.400 Org / Hr 80,000Rp 32,000Rp3 Kepala Tukang = 0.040 Org / Hr 90,000Rp 3,600Rp4 Mandor = 0.0200 Org / Hr 100,000Rp 2,000Rp

    50,100RpBahan + Tenaga 192,250Rp

    3 1 bh Pasang Saklar TunggalBahan : Harga Satuan Jumlah Harga

    1 Saklar Tunggal = 1.000 bh 20,000Rp 20,000Rp20,000Rp

    Tenaga :1 Pekerja = 0.005 Org / Hr 50,000Rp 250Rp2 Tukang Listrik = 0.050 Org / Hr 80,000Rp 4,000Rp3 Kepala Tukang = 0.005 Org / Hr 90,000Rp 450Rp4 Mandor = 0.0003 Org / Hr 100,000Rp 25Rp

    4,725RpBahan + Tenaga 24,725Rp

    4 1 bh Pasang Saklar GandaBahan : Harga Satuan Jumlah Harga

    1 Saklar Ganda = 1.000 bh 20,000Rp 20,000Rp20,000Rp

    21

  • KODEANALISA

    KEGIATAN KOEF JUMLAH HARGASATUAN HARGA SATUAN

    Tenaga :1 Pekerja = 0.005 Org / Hr 50,000Rp 250Rp2 Tukang Listrik = 0.050 Org / Hr 80,000Rp 4,000Rp3 Kepala Tukang = 0.005 Org / Hr 90,000Rp 450Rp4 Mandor = 0.0003 Org / Hr 100,000Rp 25Rp

    4,725RpBahan + Tenaga 24,725Rp

    5 1 bh Pasang Stop KontakBahan : Harga Satuan Jumlah Harga

    1 Stop Kontak = 1.000 bh 25,000Rp 25,000Rp25,000Rp

    Tenaga :1 Pekerja = 0.005 Org / Hr 50,000Rp 250Rp2 Tukang Listrik = 0.050 Org / Hr 80,000Rp 4,000Rp3 Kepala Tukang = 0.005 Org / Hr 90,000Rp 450Rp4 Mandor = 0.0003 Org / Hr 100,000Rp 25Rp

    4,725RpBahan + Tenaga 29,725Rp

    6 1 set Pasang Lampu RM 2x20 WattBahan : Harga Satuan Jumlah Harga

    1 Lampu RM 2x20 watt = 1.000 set 265,000Rp 265,000Rp265,000Rp

    Tenaga :1 Pekerja = 0.005 Org / Hr 50,000Rp 250Rp2 Tukang Listrik = 0.050 Org / Hr 80,000Rp 4,000Rp3 Kepala Tukang = 0.005 Org / Hr 90,000Rp 450Rp4 Mandor = 0.0003 Org / Hr 100,000Rp 25Rp

    4,725RpBahan + Tenaga 269,725Rp

    7 1 set Pasang Lampu SLE 22 Watt + Stand Down Light 4"Bahan : Harga Satuan Jumlah Harga

    1 Lampu SLE 22 watt + Stand Down Light 4" = 1.000 set 110,000Rp 110,000Rp110,000Rp

    Tenaga :1 Pekerja = 0.005 Org / Hr 50,000Rp 250Rp2 Tukang Listrik = 0.050 Org / Hr 80,000Rp 4,000Rp3 Kepala Tukang = 0.005 Org / Hr 90,000Rp 450Rp4 Mandor = 0.0003 Org / Hr 100,000Rp 25Rp

    4,725RpBahan + Tenaga 114,725Rp

    22

  • A . Kota : MakassarNo. Jenis Bahan Sat Harga Satuan1 2 3 4

    UPAH KERJA1 Pekerja/Buruh Org/Hari 50,000.00Rp2 Tukang- Tukang Kayu Org/Hari 70,000.00Rp- Tukang Batu Org/Hari 70,000.00Rp- Tukang Cat Org/Hari 70,000.00Rp- Tukang Listrik Org/Hari 80,000.00Rp- Tukang Pipa Org/Hari 80,000.00Rp- Tukang Besi Org/Hari 80,000.00Rp3 Kepala Tukang- Kepala Tukang Kayu Org/Hari 90,000.00Rp- Kepala Tukang Batu Org/Hari 90,000.00Rp- Kepala Tukang Listrik Org/Hari 90,000.00Rp- Kepala Tukang Cat Org/Hari 90,000.00Rp- Kepala Tukang Pipa Org/Hari 90,000.00Rp- Kepala Tukang Besi Org/Hari 90,000.00Rp4 Mandor Org/Hari 100,000.00Rp

    MATERIALBAHAN DASAR

    A Batu KaliUtuh M3 155,000.00Rp

    - Split 7 - 10 cm M3 235,000.00Rp- Split 5 - 7 cm M3 250,000.00Rp- Split 3 - 5 cm M3 260,000.00Rp- Split 2 - 3 cm M3 265,000.00Rp

    @ 1350 Kg/m3 196.30Rp- Split 1 - 2 cm M3 270,000.00Rp

    @ 1350 Kg/m3 200.00Rp- Split 0.5 - 1 cm M3 270,000.00RpB Batu Gunung M3 165,000.00RpC Sirtu M3 175,000.00RpD Tanah- Tanah Timbunan/Urugan M3 145,000.00RpE Pasir- Timbunan/Urug M3 120,000.00Rp- Pasangan M3 125,000.00Rp

    @ 1400 Kg/m3 Kg 89.29Rp- Pasir Beton M3 147,000.00Rp

    @ 1400 Kg/m3 Kg 105.00Rp- Koral Beton M3 135,000.00Rp

    @ 1500 Kg/m3F Kerikil M3 275,000.00RpG Semen (PC) Kg 1,125.00Rp- Semen warna Kg 12,000.00RpH Batu Merah Buah 550.00RpI Roster Buah 6,000.00RpJ Tali Ijuk Kg 25,000.00RpK Air bersih ltr 25.00RpL Paving Blok (K300) t = 8 cm m2 60,000.00Rp

    Kansteen 20x25x50 cm m' 73,000.00Rp

    DAFTAR HARGA BAHAN BANGUNAN DAN UPAH KERJASTANDAR PEMERINTAH PROVINSI SULAWESI SELATAN

    EDISI - IV (Desember) TAHUN 2012

    1

  • No. Jenis Bahan Sat Harga Satuan1 2 3 4

    BAHAN KAYUA Kayu Kls I (Setara Borneo, Jati, Damar, Bayam)- Balok Gergaji Sawmil M3 9,500,000.00Rp- Papan Gergaji Sawmil M3 10,000,000.00Rp- Balok Gergaji Sansaw M3 8,500,000.00Rp- Papan Gergaji Sansaw M3 8,600,000.00Rp- Dolken Kayu Dia 8 - 10 cm /400 cm M3 850,000.00Rp- Dolken Kayu Dia 8 - 10 cm /400 cm btg 20,000.00RpB Kayu Kls II

    Balok (Setara Kamper) M3 4,500,000.00RpPapan (Setara Kamper) M3 4,800,000.00Rp

    C Kayu Kls IIIBalok M3 2,770,000.00RpPapan M3 3,250,000.00RpKayu Terentang Kg 1,250.00Rp

    BAHAN PENUTUP ATAPRangka atap baja ringan (material + ereksi + pemasangan) m2 175,000.00RpWoodplank uk. 4050 x 300 x 8 mm m' 17,000.00Rpsekrup pcs 600.00RpNok Spandek m' 45,000.00RpSpandek warna m2 150,000.00RpNok Spandek warna m' 45,000.00RpBaut bh 700.00RpAluminium foil m2 3,500.00RpWoodplank lbr 20 cm m' 17,000.00Rp

    BAHAN PENUTUP LANTAI & DINDINGKeramik Lantai warna ukuran 20 x 25 cm ex Asia Tile bh 2,450.00RpKeramik Lantai warna ukuran 20 x 20 cm ex Asia Tile bh 1,980.00RpKeramik Lantai warna ukuran 30 x 30 cm ex Asia Tile unpolished bh 4,333.33RpKeramik Lantai warna ukuran 40 x 40 cm ex Asia Tile, sederajat bh 7,714.29RpGranit warna ukuran 30 x 30 cm bh 20,000.00RpGranit Lantai warna ukuran 60 x 60 cm Ex Cina bh 56,250.00RpStepnosing tangga bh 35,000.00RpBatu Alam Andesi permukaan Halus m2 180,000.00RpBatu Alam Cirebon Tidak Beraturan m2 85,000.00RpBAHAN BESI

    A Besi Beton Ulir Kg 12,000.00RpBesi Konvensional Kg 12,000.00Rp

    B PakuPaku Biasa Kg 17,000.00Rp

    C KawatBeton Kg 20,000.00RpMinyak Bekisting ltr 2,500.00Rp

    BAHAN PIPAA Pipa Besi GIP

    1/2 inci - 6 m Btg 127,500.00Rp 3/4 inci - 6 m Btg 170,000.00Rp 1 inci - 6 m Btg 251,000.00Rp 1,5 inci - 6 m Btg 150,000.00Rp 2 inci - 6 m Btg 543,500.00Rp 2,5 inci - 6 m m' 863,500.00Rp

    2

  • No. Jenis Bahan Sat Harga Satuan1 2 3 4

    Pipa PVC AW 1/2" m' 6,600.00RpPipa PVC AW 3/4" m' 5,400.00RpPipa PVC AW 1" m' 7,100.00RpPipa PVC AW 2" m' 22,800.00RpPipa PVC AW 3" m' 85,500.00RpPipa PVC AW 4" m' 111,600.00RpPipa PVC AW 6" m' 271,800.00RpSeal Tape bh 5,000.00RpRoof Drain 6 " bh 50,000.00Rp

    BAHAN LANGIT-LANGIT dan PARTISITripleks122 x 244 x 0.2 cm Lbr 52,000.00Rp122 x 244 x 0.3 cm Lbr 50,500.00Rp122 x 244 x 0.6 cm Lbr 82,000.00Rp122 x 244 x 0.9 cm Lbr 129,000.00RpHPL (pelapis dinding) Lbr 250,000.00Rp

    BAHAN RANGKA PLAFONDSuspension Bracket pcs 700.00RpSuspension Rod btg 13,200.00RpSuspension Clip pcs 1,100.00RpTop Cross Rail btg 30,000.00RpConnector pcs 1,200.00RpFurring Channel btg 25,000.00RpWall Angle btg 16,500.00RpRangka Metal Furing btg 12,500.00RpPengantung M' 2,500.00RpWall Track btg 35,000.00RpWall Stud btg 25,000.00RpHollow 20 x 40 x 0.7 mm m' 22,000.00RpHollow 40 x 40 x 0.7 mm m' 24,000.00RpKlem bh 7,800.00RpRamsel Nails bh 4,000.00RpSekrup Gypsum bh 74.00RpPaku Beton bh 70.00RpGypsum 9 mm lbr 55,000.00RpGypsum Jaya Tekstur 9 mm lbr 58,000.00RpCotton Tape roll 20,000.00RpDrywall Screw dos 65,000.00RpCornice Adhesive zak 65,000.00RpList Profil Gypsum m' 17,500.00RpPerekat Gypsum kg 17,500.00Rp

    BAHAN PENGGANTUNGA Kunci Tanam

    Kunci Tanam Kamar Mandi Bh 143,750.00RpKunci Pintu Aluminium Bh 100,000.00RpKunci Pintu Bh 306,000.00RpMATERIAL ALUMINIUMKusen Aluminium (coating) ex Alexindo Warna m' 95,000.00RpKusen Aluminium ex Alexindo 4" Warna m' 95,000.00RpSealent/Karet m' 5,000.00RpBingkai Pintu Aluminium Ambang Atas Warna m' 85,000.00RpBingkai Pintu Aluminium Ambang Bawah Warna m' 85,000.00Rp

    3

  • No. Jenis Bahan Sat Harga Satuan1 2 3 4

    Bingkai Pintu Aluminium Ambang Vertikal Warna m' 85,000.00RpBingkai Jendela Aluminium Warna m' 85,000.00RpWindow Casement 8 " psg 50,000.00RpWindow Casement 16 " psg 100,000.00RpWindow Casement 20 " psg 135,000.00RpRMB for Aluminium 704 unit 75,000.00RpHandle Daun Pintu Aluminium set 500,000.00RpFloor Hindge and Patch Lock ex Dorma unit 1,000,000.00RpDoor Closer set 250,000.00RpEngsel Pintu psg 30,000.00RpEngsel Jendela psg 25,000.00RpRel Jendela Aluminium m' 65,000.00RpRel Pintu m' 100,000.00RpRolling Door m2 550,000.00RpPintu Spandrell Aluminium KM/WC unit 550,000.00RpJalusi Aluminium m2 650,000.00RpAlucopan m2 300,000.00RpGarda Pintu unit 5,000,000.00RpRailing Tangga Stainless m' 450,000.00Rp

    BAHAN FINISHING/CATSika Waterproofing kg 35,000.00Rp

    A Cat TembokCat Dasar liter 12,000.00RpCat Metrolite liter 25,000.00RpCat Undercoat eksterior liter 39,120.00RpCat Undercoat interior liter 39,120.00Rp Mowilex Interior liter 47,280.00Rp Mowilex Exterior liter 72,000.00RpPlamur A Plus liter 5,000.00RpKertas Gosok lbr 2,500.00Rp

    B Cat Kayu/BesiCat Dasar Kg 21,000.00RpCat Kayu / Besi Avian Kg 35,000.00RpMeni Kayu Kg 9,000.00RpPlamur boyo Kg 15,700.00RpMinyak Cat Ltr 18,000.00RpMeni Besi Kg 12,000.00RpSoda Api Kg 35,000.00RpPolitur Ltr 35,000.00RpPolitur Jadi Ltr 40,000.00Rp

    BAHAN KACASticker Kaca Buram M2 75,000.00RpKaca Panasap Green (Kaca Hijau) 5 mm M2 285,000.00RpKaca Bening 6 mm M2 165,000.00RpKaca Buram 6 mm M2 300,000.00RpKaca Tempered 12 mm M2 650,000.00RpSealent kg 35,000.00RpTop and bottom patch ex Dorma unit 1,750,000.00RpFloor Hindge and Patch Lock ex Dorma un