CODE DESIGN :
SNI 03 -1729 - 2002
PERATURAN PEMBEBANAN INDONESIA UNTUK GEDUNG (PPUIG) th. 1983
A. DATA-DATA YANG DIKETAHUI
- Kemiringan atap = 27.5 derajat
- Jarak antar kuda – kuda (bentang gording) = 7 m
- Bentang kuda – kuda = 36 m
- Jarak antar gording( miring ) = 1.80 m
- Jarak Tritisan 1.00 m
- Jarak Tritisan ( miring ) 1.13 m
- Berat penutup atap almunium (PPIUG 1983 hal 12) = 10 kg/m2
- Beban hidup ( orang ) = 100 kg/m2
- Beban angin = 25 kg/m2
- Beban plafon = 0
- Mutu baja = BJ 37
fy = 240 Mpa
fu = 370 Mpa
- Profil gording
w = 7.51 kg/m
B.PEMBEBANAN
I. Beban Mati
Berat sendiri gording 7.51 x 7.00 x 9.81 /1000 = 0.52 KN
Berat penutup atap 10 x 1.80 x 7 x 9.81 /1000 = 1.24 KN
II. Beban Hidup
Berat pekerja [Po], (PPIUG 1983 pasal 3.2.1) = 100.00 kg
100 x 9.81 / 1000 = 0.98 KN
Beban air hujan (wh) = ( 40 - 0.8 α ) kg/m2 dan tidak lebih dari 20kg/m2
(PPIUG 1983 pasal 3.2.2.a)
wh 40 - 0.8 x 27.5 = 18.00 kg/m2
Ph = wh x jarak gording miring x jarak antar kuda2
18.00 x 1.80 x 7 x 9.81 /1000= 2.23 KN
III. Beban angin
Berdasarkan PPIUG 1983, Koefisien angin untuk gedung tertutup adalah sebagai berikut:
Gambar : Koefisien angin menurut PPUIG 1983
PERENCANAAN KUDA-KUDA
C 150 x 65 x 20 x 3.2