Babar-VR R04

39
mzbabar @msn.com

Transcript of Babar-VR R04

Page 2: Babar-VR R04

I am basically a…

Working as a

Page 3: Babar-VR R04

Bachelors From…

In 2000

Page 4: Babar-VR R04

WORK

Page 5: Babar-VR R04

WORK

Page 6: Babar-VR R04

As a Site Engineer

1st Job-2000

As a Coordinating Engineer

OIL AND GAS/ BUILDING

Page 7: Babar-VR R04

As a Project Engineer

In 2001

• Managed & Controlled

• Planned

• Executed and Monitored

OIL AND GAS

Page 8: Babar-VR R04

In 2002, moved to…

KHOBAR, KSA

Page 9: Babar-VR R04

As a Civil Estimator/ Planner

In 2002

Supplied by

• Estimated the cost of different projects under GSO & Base Crew Contracts.

• Estimated the quantities of materials & Labors &Planned the labors

• Made Scope of work by following Saudi ARAMCO Standards & Specifications.

• Made Class III Estimates

OIL AND GAS

Page 10: Babar-VR R04

In 2003, moved to…

ABU DHABI, UAE

Page 11: Babar-VR R04

As a Planning and Cost Control Engineer

In 2003

• Planning Works

• Cost Control Works

• Issue Management

• Reporting

• Tendering Works

• Prequalification Works

• MR Works

• Change Management

• Portfolio Management

• Schedule Control

• Risk Management

INFRASTRUCTURE

Page 12: Babar-VR R04

As a Cost Controller (Project Controller)

In 2007

Left because of some Family Issues

• Planning Works

• Cost Control Works

• Issue Management

• Reporting

• Change Management

• Portfolio Management

• Schedule Control

• Risk Management

BUILDINGS

Page 13: Babar-VR R04

In 2007, moved back to…

LAHORE, PAK

Page 14: Babar-VR R04

As a Project Control Engineer

In 2007

• Planning Works

• Cost Control Works

• Issue Management

• Reporting

• Tendering Works

• Change Management

• Portfolio Management

• Risk Management

• Schedule Control

INFRASTRUCTURE

Page 15: Babar-VR R04

As a Manager Project Controls

In 2008

• Planning Works

• Cost Control Works

• Issue Management

• Reporting

• Tendering Works

• Change Management

• Portfolio Management

• Risk Management

• Schedule Control

• SAP PS Team Lead

• Power User

• Change Lead

• Document Control

• Productivity Control

• Procurement Control

• Engineering Deliverables Control

OIL AND GAS

Page 16: Babar-VR R04

Masters From…

MS TQM (Total Quality Management)

Project Management, Quality Management, Performance Management, Supply Chain Management, Human Resource

Management, MIS, Organizational Behavior, Strategic Planning & Deployment, Quality Tools, Health, Safety and Environment al

Management, International Management System & Standards, Production & Operation Management, Marketing and Financial

Management

In 2010

Page 17: Babar-VR R04

PGD From…

Project Planning and Control

In 2010

Page 18: Babar-VR R04

Certified…

In 2011

In 2012

Page 19: Babar-VR R04

In 2013, again moved to…

RIYADH, KSA

Page 20: Babar-VR R04

Working as a

2013 – till date

Hired as a Senior Project Controls Engineer

• Planning Works

• Cost Control Works

• Issue Management

• Reporting

• Change/Trend Management

• Risk Management

• Schedule Control

• Document Control

• Procurement Control

• Engineering Deliverables Control

BUILDINGS

Page 21: Babar-VR R04

AREAS WORKED IN…

Page 22: Babar-VR R04

Upto date with latest technologies…

Page 23: Babar-VR R04

Computer Skills …

Page 24: Babar-VR R04

Received Professional Trainings…

CO-ECP

Page 25: Babar-VR R04

Received Management Trainings…

Page 26: Babar-VR R04

CO-ECP

Page 27: Babar-VR R04

Member of…

Page 28: Babar-VR R04

Expert in Implementing Project Controls by using various Tools and Techniques in the Areas of Engineering, Procurement, Construction and Commissioning Phases.

Page 29: Babar-VR R04

in no time got recognition fromTop brass

Page 30: Babar-VR R04
Page 31: Babar-VR R04

A WELL BALANCED PROFESSIONAL

Think out of the BOX

TakingInitiative

Page 32: Babar-VR R04
Page 33: Babar-VR R04
Page 34: Babar-VR R04
Page 35: Babar-VR R04
Page 36: Babar-VR R04

0%

20%

40%

60%

80%

100%

120%

Jun-09 Jul-09 Aug-09 Sep-09 Oct-09 Nov-09 Dec-09 Jan-10 Feb-10 Mar-10 Apr-10 May-10 Jun-10 Jul-10 Aug-10

% P

rog

res

s

Time Wise S- Curve for Contract No. ABC

Page 37: Babar-VR R04
Page 38: Babar-VR R04

+966 – [email protected]

sa.linkedin.com/pub/m-zaheer-ud-din-babar-pe-civil-pmp-pmi-rmp/19/98a/59a/

Page 39: Babar-VR R04