BAB 8 Pondasi DONE

download BAB 8 Pondasi DONE

of 7

Transcript of BAB 8 Pondasi DONE

  • 8/19/2019 BAB 8 Pondasi DONE

    1/15

    FAKULTAS TEKNIK SIPIL DANPERENCANAAN

    UNIVERSITAS KRISTEN PETRA

    TUGAS STRUKTUR BETON Halaman:

    BAGIAN STRUKTUR:NO. GAMBAR:

    PONDASI NRP: 2141208921412133

    21411136

    PERHITUNGAN

    BAB VIII

    PONDASI

    8.1. Perencanaan Tulangan Bal! Sl" 

    Bal! Sl" 

     b= 20 mm !"# = 3 M$a % = 342 mm

    &= 400 mm !'= 400 M$a T(lan)an *16

    Ha+,l Anal,+a -TABS Bal/ B

    Mma = 34.0143 Nm

    ( ma = 0.2949 N

    Penulangan Len#ur Sl"

    A+ m,n =√ fc' 

    4 fy  b5  % = 316.140 mm

    A+ m,n = 1,4fy   b5  % = 299.2 mm

    A+ ma = 07 ρbal $ b5  %

    = 07 0,85 f c

    '  β

    fy 

    600

    600+ fy 20 342

    = 2289.262 mm

    = T

    0.8 !"# a b = A+ !'

    0.8 3 a 20 = A+ 400

    a = 0.0381 A+

    Mn = T % 0. a

     Mu

    0,9 = A+ !' % 0. a

    A+2  0. 0.0381 A+ !' 342 ; Mu

    0,9 = 0

    A+1= 26.28 mm2 < A+2 = 08694.908 mm2

    0

  • 8/19/2019 BAB 8 Pondasi DONE

    2/15

    FAKULTAS TEKNIK SIPIL DANPERENCANAAN

    UNIVERSITAS KRISTEN PETRA

    TUGAS STRUKTUR BETON Halaman:

    BAGIAN STRUKTUR:NO. GAMBAR:

    PONDASI NRP: 2141208921412133

    21411136

    PERHITUNGAN

    A+ A+ m,n= 316.1402*16

      Tulangan a#a% &an 'a(a) a!an &*+a%ang &engan ,D1-

    Penulangan Ge%er Sl"

    φ" = 0. 1>6 ? fc b5 % = 0. 1>6 3 20 342 >1000 = 63.2281 N

    0.φ" ( φ" 7 maa m@n))(naan +@n)an) %@n)an aa m,n,m(m.

    +m,n=3 Av fy

    bw 

    =

    πx102

     x240

    4

    ¿

    3¿

    ¿

     = 226.1946 mm

    Caa +@n)an) D,%a b/l@& m@l@b,&, :

    S m,n = %>2 aDa( 600

    = 11 mm

    S@n)an) 'an) %,)(naan a%ala& φ10 10 mm.

    8.1.,. Ke%*+ulan Bal! Sl" 

    Ca%, D(lan)an bal/ +l//! 'an) D@$a+an) %, la$an)an a%ala& +@ba)a, b@,(D :

    Gamba 8.1

    1

  • 8/19/2019 BAB 8 Pondasi DONE

    3/15

    FAKULTAS TEKNIK SIPIL DANPERENCANAAN

    UNIVERSITAS KRISTEN PETRA

    TUGAS STRUKTUR BETON Halaman:

    BAGIAN STRUKTUR:NO. GAMBAR:

    PONDASI NRP: 2141208921412133

    21411136

    PERHITUNGAN

    T,$@ Sl//! 

    Gamba 8.2. *@na& SD(D( Sl//! 

    8.,. Perencanaan Tulangan Pla# Ba%een#Per)*#ungan Be'an Pla# lan#a* &a%ar

    1. B@ban MaD, E%

    B@aD +@n%,, = 0.1F2400 = 360 )>m2

    B@aD +$@+, 3 "m = 21 3 = 63)>m2

    T/Dal = 360 ; 63 = 423 )>m2

    2. B@ban H,%($ El

    anDa, %a+a = 20 )>m2

    B@ban UlD,maD@ E(

    2

  • 8/19/2019 BAB 8 Pondasi DONE

    4/15

    FAKULTAS TEKNIK SIPIL DANPERENCANAAN

    UNIVERSITAS KRISTEN PETRA

    TUGAS STRUKTUR BETON Halaman:

    BAGIAN STRUKTUR:NO. GAMBAR:

    PONDASI NRP: 2141208921412133

    21411136

    PERHITUNGAN

    E( = 1.2 E% ; 1.6 El

      = 1.2 423 ; 1.6 20

      = 90.6 )>m2 = 8.9036 N>m2

    Cn#) +er)*#ungan +enulangan +a&a +ela# I

    /nD/& $@&,D(n)an :

    ' : = 1.00

    Ml = 0.001 ( l2

    . 44  = 0.001 8.9036 62 44

      = 9.6184 Nm

    M( > b%2 = 9.6184 109 > 1000 123.2

     = 292

    = 0.0013 Tab@l UR I

    A+ = b %

      = 0.0013 1000 123.

      = 188.9 mm2 >m

    A+ m,n = 0.2J b &

     = 0.2>100 1000 10

      = 3 mm2 >m

      *,)(naan A+ 3 mm2 >m

      M@n))(naan T(lan)an ∅13

      C(mla& D(lan)an 'an) %,b(D(&an = 3 > 0.2 22> 13 = 2.82

      Caa anDa D(lan)an = 1000 > 2.82 = 33.93 M@n))(naan ∅1320

      P@&,D(n)an $a%a $@laD 'an) la,n %a$aD %,l,&aD %, lam$,an.

    PlaD = ∅1320

    3

  • 8/19/2019 BAB 8 Pondasi DONE

    5/15

    FAKULTAS TEKNIK SIPIL DANPERENCANAAN

    UNIVERSITAS KRISTEN PETRA

    TUGAS STRUKTUR BETON Halaman:

    BAGIAN STRUKTUR:NO. GAMBAR:

    PONDASI NRP: 2141208921412133

    21411136

    PERHITUNGAN

    Gamba 8.3 *@na& SD(D( $laD %a+a 

    8./. Perencanaan Fn&a%*

    8./.1. Be'an 0ang &*guna!an +a&a +erencanaan Fn&a%*

    B@ban D@!aD/ $a%a !/n%a+, %,D@nD(an b@%a+aan SNI 1262012 $a+al 4.2.2

    P@&,D(n)an )a'a n/mal D@!aD/ N(:

     N(1 = 1.4 N*

     N(2 = 1.2 N* ; 1.6 N

     N(3 = 1.2; 0.2 S*S N* ; R N ; 1.0 N-L ; 0.3 N-

     N(4 = 1.2; 0.2 S*S N* ; R N 1.0 N-L ; 0.3 N-

     N( = 1.2; 0.2 S*S N* ; R N ; 1.0 N- ; 0.3 N-L

     N(6 = 1.2; 0.2 S*S N* ; R N 1.0 N- ; 0.3 N-L

    4

  • 8/19/2019 BAB 8 Pondasi DONE

    6/15

    FAKULTAS TEKNIK SIPIL DANPERENCANAAN

    UNIVERSITAS KRISTEN PETRA

    TUGAS STRUKTUR BETON Halaman:

    BAGIAN STRUKTUR:NO. GAMBAR:

    PONDASI NRP: 2141208921412133

    21411136

    PERHITUNGAN

     N( = 0.90.2 S*S N* ; 1.0 N-L ; 0.3 N-

     N(8 = 0.90.2 S*S N* 1.0 N-L ; 0.3 N-

     N(9 =0.90.2 S*S N* ; 1.0 N- ; 0.3 N-L

     N(10 = 0.90.2 S*S N* 1.0 N- ; 0.3 N-L

    P@&,D(n)an m/m@n D@!aD/ M(:

    M* = M*2 ; M*3

    M = M*2 ; M*3M-L = M*3

    M- = M*2

    M(1 = 1.4 M*

    M(2 = 1.2 M* ; 1.6 M

    M(3 = 1.2; 0.2 S*S M* ; RM ; 1.0 M-L ; 0.3 M-

    M(4 = 1.2; 0.2 S*S M* ; R M 1.0 M-L ; 0.3 M-

    M( = 1.2; 0.2 S*S M* ; RM ; 1.0 M- ; 0.3 M-L

    M(6 = 1.2; 0.2 S*S M* ; R M 1.0 M- ; 0.3 M-L

    M( = 0.90.2 S*S M* ; 1.0 M-L ; 0.3 M-

    M(8 = 0.90.2 S*S M* 1.0 M-L ; 0.3 M-

    M(9 =0.90.2 S*S M* ; 1.0 M- ; 0.3 M-L

    M(10 = 0.90.2 S*S M* 1.0 M- ; 0.3 M-L

    enen#u!an Ga0a Nral &an en ASD 'er&a%ar!an SNI 12,-3,41, 5.,./

    Ga'a n/mal

     N1 = N*

     N2 = N* ; N

     N3 = N* ; N ;0. 1.0 N-L ; 0.3 N-

     N4 = 0.6 N* ; 0. 1.0 N-L 0.3 N-

    Ga'a M/m@n

    M1 = M*

    M2 = M* ; M

    M3 = M* ; M ;0.1.0 M-L ; 0.3 M-

  • 8/19/2019 BAB 8 Pondasi DONE

    7/15

    FAKULTAS TEKNIK SIPIL DANPERENCANAAN

    UNIVERSITAS KRISTEN PETRA

    TUGAS STRUKTUR BETON Halaman:

    BAGIAN STRUKTUR:NO. GAMBAR:

    PONDASI NRP: 2141208921412133

    21411136

    PERHITUNGAN

    M4 = 0.6 M* ; 0. 1.0 M-L 0.3 M-

    Ga'a H/,/nDal

    H1 = H*

    H2 = H* ; H

    H3 = H* ; H ; 0.1.0 H-L ; 0.3 H-

    H4 = 0.6 H* ; 0. 1.0 H-L 0.3 H-

    8./.,. Be'an 0ang &*guna!an +a&a +erencanaan Fn&a%* T*ang Pancang +a&a 6*n 14

    *,mana aDaaDa %a, E" %an n,la, m,n,mal CHP %,amb,l %a, @%alam &2% 7 &% 7 & 7 &;%

    +@$@D, "/nD/& %,ba5a& ,n, :

    Lca#*

    n

    De+#

    )

    7c !g9c,: ;HP !g9c:

    S1 S, S/ S5*

    nS1 S, S/ S5 *n

    )3,& 18.1 200 200 012

    0 10301300

    110

    1300

    1030

    )3& 18. 16 2210

    110

    110 1100130

    1200

    140

    1100

    ) 19 200 22 230

    120

    120 1200 130

    120

    10

    1200

    )"m

    S$@+,!,a+, T,an) Pan"an) :

    T,an) Pan"an) %a, $@(+a&aan B@D/n P,ma b@((an 44 "m D'$@ B4 %@n)an :

    K@%alaman = 19 m

    Pall = 22.16 D/n

    M" = 10.48 D/n m@D@ 

    6

  • 8/19/2019 BAB 8 Pondasi DONE

    8/15

    FAKULTAS TEKNIK SIPIL DANPERENCANAAN

    UNIVERSITAS KRISTEN PETRA

    TUGAS STRUKTUR BETON Halaman:

    BAGIAN STRUKTUR:NO. GAMBAR:

    PONDASI NRP: 2141208921412133

    21411136

    PERHITUNGAN

    M(lD = 1.3 D/n m@D@ 

    Ab@a,n) = 4 4 = 202 "m2

    K@l,l,n) = 4 4 = 180 "m

    *a'a %((n) 1 D,an) b@%a+aan @(aDan b@D/n : Pall = 22.16 D/n

    *a'a %((n) 1 D,an) b@%a+aan %a'a %((n) Dana& :

    all  = E"  A b > 3 ; CHP K@ll > = 3

    202100×

     ;

    180.12   ×

    = 1120 K) 112. D/n

    Maa all 'an) m@n@nD(an %a, a$a+,Da+ Dana& 'a,D( 112. D/n

    Ca%, (nD( m@n@nD(an (mla& D,an) $an"an) b@%a+aan a$a+,Da+ Dana& maa %,$aa,

    (m(+ ,a,a. P %,amb,l %a, /mb,na+, )@m$a D@b@+a7 $a%a /,n 1:

    C(mla& D,an) ,a,a = all Q

     P ×.1

    C(mla& D,an) ,a,a = 81.9.112

    4.1848.1

     x

    ×

    = 2. b(a& 8 b(a&

    * = 4 "m

    Caa anDa D,an) 3*

    3* = 3 4 = 13 "m = 1.3 m

    *,amb,l 1.4 m

    S@%an)an aa D,an) @ ((n)

    1.* = 1. 4 = 0.6 "m = 0.6 m

    *,amb,l 0. m

  • 8/19/2019 BAB 8 Pondasi DONE

    9/15

    FAKULTAS TEKNIK SIPIL DANPERENCANAAN

    UNIVERSITAS KRISTEN PETRA

    TUGAS STRUKTUR BETON Halaman:

    BAGIAN STRUKTUR:NO. GAMBAR:

    PONDASI NRP: 2141208921412133

    21411136

    PERHITUNGAN

    P@&,D(n)an (nD( D,an) 'an) b@@l/m$/.

    -!,+,@n+, %a, @l/m$/ D,an) %,ba5a& ,n, %,&,D(n) b@%a+aan (m(+ %a, /nQ@+,abba@.

    =

     s

    d arctg 

    * = 4 "m

    S = 140 "m

    =

    140

    4arctg 

    = 1.82

    nm

    nmmn Eg 

    ×

    ×−+×−×−=

    11

    901

      θ 

    22

    212212

    90

    82.11

    ×

    ×−+×−×−= Eg 

    802.0= Eg 

    Ca%, %a'a %((n) D,an) $@l( %,@%(+, %@n)an %,al,an !aD/ @!,+,@n+, D,an)

    all  = 112. D/n 0.802 = 90.4414 D/n

    al( all %,@%(+, %an %,%a$aD (mla& D,an) +@ban'a 6 D,an)%,$a+an) 8 D,an).

    *a, )amba D@+@b(D %,D@nD(an //%,naD ma+,n)ma+,n) D,an) %@n)an //%,naD D,D, n/l

    a%ala& D,D, a+ /l/m

      1 2 3 4

     TOTALX -0.7 0.7 -0.7 0.7

     Y -0.7 -0.7 0.7 0.7

    X² 0.49 0.49 0.49 0.49 ƩX2 1.96

     Y² 0.49 0.49 0.49 0.49 ƩY2 1.96

    Pa%a D,D, 1 %@n)an /mb,na+, b@ban *;;0.-

    8

  • 8/19/2019 BAB 8 Pondasi DONE

    10/15

    FAKULTAS TEKNIK SIPIL DANPERENCANAAN

    UNIVERSITAS KRISTEN PETRA

    TUGAS STRUKTUR BETON Halaman:

    BAGIAN STRUKTUR:NO. GAMBAR:

    PONDASI NRP: 2141208921412133

    21411136

    PERHITUNGAN

    BS D,an) = A D,an) K@%alaman γ = 1000202

    19 2.4 = 9.234 D/n

    P = 1848.4>9.81 ; BS $/@  

    = 188.43 ; 2.4 0.6 2.8 2.8 = 199.23

    M = 1.40 D/n m

    M' = 4.68 D/n m

    K//%,naD D,D, 2 :

    L=0.m %an = 0.m

    P ma $a%a 1 D,an) =   BStiang 

    n

     P +

    ×2

     X 

     X  M 

    ×2

    Y  M 

    =234.9

    8

     199.23   +

    ; 6.11

    .0.401   ×

    ; 6.11

    .04.68:   −×

    = 66.338 D/n 112. D/n OK

    S@lan(Dn'a (nD( D,D,D,D, 'an) la,n m@n))(naan @"@l

    Kombin

    asi  1 2 3 4

    D+L+0.

    7E

    !333

    0

    66!337

    92

    1!992

    73

    62!99

    76

    /n%a+, %a$aD %,$aa, a@na +@m(a )a'a 'an) D@a%, %,ba5a& )a'a ,,n.

    9

  • 8/19/2019 BAB 8 Pondasi DONE

    11/15

    FAKULTAS TEKNIK SIPIL DANPERENCANAAN

    UNIVERSITAS KRISTEN PETRA

    TUGAS STRUKTUR BETON Halaman:

    BAGIAN STRUKTUR:NO. GAMBAR:

    PONDASI NRP: 2141208921412133

    21411136

    PERHITUNGAN

    *,mana :

    n = (mla& D,an)

    %an ' a%ala& //%,naD

    T(lan)an l@nD( 'an) %,D,na(

    B@%a+aan a+(m+, @$,D b@ba+

    Gamba 8.2 ,%@al,+a+, aa&

    S@l,m(D b@D/n = mm

    P1D = $1;$4

    = .3330 ; 1.9923

    = 10.328 D/n = 102.866 N

    P1D = $2;$4 Gamba 8.3 ,%@al,+a+, aa& '

    = 66.3392 ; 62.996

    = 129.332 D/n = 1268.8 N

    P1D 'an) %,$aa, = 1268.8 N

    P2D = $1;$2

    = .3330;66.3392

    = 121.61 D/n = 1193.92 N

    80

  • 8/19/2019 BAB 8 Pondasi DONE

    12/15

    FAKULTAS TEKNIK SIPIL DANPERENCANAAN

    UNIVERSITAS KRISTEN PETRA

    TUGAS STRUKTUR BETON Halaman:

    BAGIAN STRUKTUR:NO. GAMBAR:

    PONDASI NRP: 2141208921412133

    21411136

    PERHITUNGAN

     

    P2D =$3;$4

    = 1.9923;62.996

    = 114.99 D/n = 1128.0 N

    P2D 'an) %,$aa, = 1193.92 N

    Mma aa& = P1D 1.4 = 1268.8 1.4 = 16.292 Nm

    Mma aa& ' = P2D 1.4 = 1193.92 1.4 = 161.0288 Nm

    8././. Perencanaan P*le Ca+

    Per)*#ungan P*le Ca+ +a&a !l P1

    V. Ka+a%*#a% Per

    @ )@+@ l@nD( 1 aa&

    * T(lan)an: *22

    Per !l

    D@bal: 0.6 m b: 0. m

     b: 2.8 m &: 0. m

    &: 2.8 m

     % = 600 22>2 = 14 mm

    ( = 1848.4 N %a, D,an) $1D %an $2D

    " = 61 ?c f     b % SNI 0328420027@E 46 

    = 07 6

    1

    3 2800 14

      = 1064.302 KN

    ( V "

    1848.4 N V 1064.302 N  eerlu!an #ulangan ge%er

    + =Vc

    Vu

    −ϕ  =.0>302.1064

    .0

    4.1848

    −= 104.6 KN

    81

  • 8/19/2019 BAB 8 Pondasi DONE

    13/15

    FAKULTAS TEKNIK SIPIL DANPERENCANAAN

    UNIVERSITAS KRISTEN PETRA

    TUGAS STRUKTUR BETON Halaman:

    BAGIAN STRUKTUR:NO. GAMBAR:

    PONDASI NRP: 2141208921412133

    21411136

    PERHITUNGAN

    Caa anDa D(lan)an b@%a+aan SNI 032482002 $a+al 13.6.:

    131.18106.104

    14F400F16FF2.0F4

    3

    2

    ==  π 

     s

     yv

    d  f   A s

     mm $aa, 4 a,

    S@n)an) 'an) %,)(naan a%ala& 4*1610.

    @ )@+@ $/n+ a,baD /l/m @ $/@

    % = 600 22>2 = 14 mm

    /l/m = 1848.4 N

     b/  = 2 W 00 ; 2 14>2;00;214>2

    = 486 mm

    X" = 00>00 = 1

    Y = 40 ,nD@,/

    φ" =φ W 4 W?c f   W b/ W % 12

    1×  = 0. W 1448634   ××× 121×  = 3691.61 KN

    φ"=φ W (2+4

     βc) (2+4

     βc ) W 1>12 W   √ f c '  W b/ W % = 899. KNφ"=φ W (α s  ×dbo +2) W 1>12 W   √ f c '  W b/ W % = .84 KN

    ( φ"  1848.4 3691.61 KN OK

    @ )@+@ $/n+ a,baD $,l@ @ $/@

    T,an) Pan"an) = 4 4 "m

    2

    % = 600 22>2 = 14 mm

     b/ = 4 * D,an) ; %

     = 4 40;14 = 386 mm

    φ" =φ W 4 W?c f   W b/ W % 12

    1×  =07 4 3   386 14 12

    1

    = 2931.394 KN

    φ"=φ W (2+ 4 βc) (2+4

     βc ) W 1>12 W   √ f c '  W b/ W % = 864.4 KN

    82

  • 8/19/2019 BAB 8 Pondasi DONE

    14/15

    FAKULTAS TEKNIK SIPIL DANPERENCANAAN

    UNIVERSITAS KRISTEN PETRA

    TUGAS STRUKTUR BETON Halaman:

    BAGIAN STRUKTUR:NO. GAMBAR:

    PONDASI NRP: 2141208921412133

    21411136

    PERHITUNGAN

    φ"=φ W (α s  ×d

    bo+2) W 1>12 W   √ f c '  W b/ W % = 33.208 KN

    Amb,l φ" =2931.394 N

      ( = R(ma 1 D,an) $an"an)

      = 462.14 KN

    ( Z "

    462.14 KN Z 2931.394 KN OK

    8.5. Penulangan Per

    8.5.1 Penulangan len#ur ara) >

    Mma aa& = 16.292 Nm

    Paa, %,am@D@ D(lan)an *22

    % =60022>2 =14 mm

    2bxd 

     M u

    =2

    14.08.2

    292.16

     x = 2401.21  = 0.009   UR I 7$+ .1

    A+ =  b % UR I 7$+ .1

      = 0.009 2800 14 = 11369.68 mm2 >2.8 m#= 4060.6 mm2>m#

    T(l m,n,m(m $laD 0718J 1000 14 = 92.2 mm2

    A+ V A+ m,n A+ $a+an) = 4060.6 mm2 *2290

    A+ +(+(D = A+ $a+an) *1090

    8.5., Penulangan len#ur ara) ?

      Mma aa& ' = 161.0288 Nm

    2bxd 

     M u

    =2

    14.08.2

    0288.161

     x = 228.914  = 0.006  UR I 7$+ .1

    A+ =  b % UR I 7$+ .1

      = 0.006 2800 14 = 1093.92 mm2 >2.8 m#= 3906.4 mm2>m#

    T(l m,n,m(m $laD 0718J 1000 14 = 92.2 mm2

    A+ V A+ m,n A+ $a+an) = 3906.4 mm2 *2290

    A+ +(+(D = A+ $a+an) *10100

    83

  • 8/19/2019 BAB 8 Pondasi DONE

    15/15

    FAKULTAS TEKNIK SIPIL DANPERENCANAAN

    UNIVERSITAS KRISTEN PETRA

    TUGAS STRUKTUR BETON Halaman:

    BAGIAN STRUKTUR:NO. GAMBAR:

    PONDASI NRP: 2141208921412133

    21411136

    PERHITUNGAN

    S@&,n))a $@n(lan)an $/@ m@n))(naan *2290 (nD( aa& %an *2290 (nD(

    aa& '.

    84