NIM GENAPBulan Jan Feb Maret April Mei Juni Juli AgustusEo 5.55 5.67 5.6 5.35 4.28 5.32 5.3 5.45Pekolasi 2 2 2 2 2 2 2 2Eo+P 7.55 7.67 7.6 7.35 6.28 7.52 7.3 7.45Rh (fin5dry) 5.02 4.57 5.6 4.67 0.8 0 0 0.05
Soal :1. Hitung kebutuhan air untuk padi unggul dengan 2 golongan2. Hitung ketersediaan air di sumbernya3. Gambar grafik waterbalance
Data untuk simulasi MockGENAPi 0.35k 0.4CA 150 km2Is 50 mmsmc 100 mm
Data Hujan (GENAP)Th.2008P 200 222 420 420 25 24 0 0n 11 15 11 10 7 4 0 3Eto 132.4 117.2 131.6 118.7 120.6 117.8 120.3 125.4m 70 60 50 40 40 50 60 70Th.2009P 110 180 305 306 89 0 64 23n 15 16 20 18 8 7 1 0Eto 132.4 117.2 131.6 118.7 120.6 117.8 120.3 125.4m 80 70 60 50 50 50 60 70Th.2010P 295 397 78 333 75 0 32 17n 15 21 12 10 11 7 3 2Eto 132.4 117.2 131.6 118.7 120.6 117.8 120.3 125.4m 70 60 50 40 30 30 40 50Th.2011P 425 340 256 256 194 0 0 0n 12 16 17 11 7 5 1 0Eto 132.4 117.2 131.6 118.7 120.6 117.8 120.3 125.4m 40 30 30 30 30 30 40 50Th.2012P 318 136 406 255 66 102 0 19n 10 15 16 19 16 3 2 1Eto 132.4 117.2 131.6 118.7 120.6 117.8 120.3 125.4m 50 40 30 30 30 40 50 60
Sept Oktober Nov Des5.23 5.3 5.53 4.97
2 2 2 27.23 7.3 7.53 6.970.07 0.02 0.8 2.56
56 0 125 1522 0 4 15
112.8 120.8 123.4 133.780 90 90 80
0 205 150 1900 1 5 10
112.8 120.8 123.4 133.780 90 90 80
0 23 112 1220 3 9 15
112.8 120.8 123.4 133.760 70 60 50
102 19 58 2840 2 7 10
112.8 120.8 123.4 133.760 70 70 60
250 17 280 250 0 6 9
112.8 120.8 123.4 133.770 80 80 70
Lampiran 4 -1.
TABEL ZYLSTRAKEBUTUHAN PENJENUHAN PENDAHULUAN (AIR IRIGASI)
SELAMA PENYIAPAN LAHAN UNTUK PADI
Jumlah Penjenuhan 200 mm
T Penguapan dan Perembesan (Eo + P) mm/hari
Hari 3.5 3.6 3.7 3.8 3.9 4.0 4.1 4.2 4.3 4.4 4.5
30 8.6 8.6 8.7 8.8 8.8 8.9 8.9 9.0 9.1 9.1 9.2
35 7.6 7.7 7.8 7.8 7.9 7.9 8.0 8.1 8.1 8.2 8.3
40 7.0 7.0 7.0 7.1 7.2 7.3 7.3 7.4 7.5 7.5 7.6
45 6.4 6.5 6.6 6.6 6.7 6.7 6.5 6.9 6.9 7.0 7.1
50 6.0 6.1 6.1 6.2 6.3 6.3 6.4 6.5 6.5 6.5 6.7
55 5.7 5.7 5.8 5.5 5.9 6.0 6.1 6.0 6.2 6.3 6.3
60 5.4 5.5 5.5 5.6 5.7 5.7 5.8 5.9 5.9 6.0 6.1
T Penguapan dan Perembesan (Eo + P) mm/hari
Hari 6.0 6.1 6.2 6.3 6.4 6.5 6.6 6.7 6.8 6.9 7.0
30 10.1 10.2 10.2 10.2 10.4 10.4 10.5 10.6 10.6 10.7 10.8
35 9.2 9.3 9.4 9.4 9.5 9.6 9.6 9.7 9.8 9.8 9.9
40 8.6 8.7 8.7 8.7 8.8 8.9 9.0 9.1 9.1 9.2 9.3
45 8.1 8.2 8.2 8.2 9.4 8.5 8.5 8.6 8.7 8.8 8.8
50 7.7 7.8 7.9 7.9 8.0 8.1 8.2 8.2 8.3 8.4 8.5
55 7.4 7.5 7.6 7.6 7.7 7.8 7.9 8.0 8.1 8.1 8.2
60 7.2 7.3 7.3 7.3 7.5 7.6 7.7 7.7 7.8 7.9 8.0
Data : PSA - 010, Dirjen Pengairan, Bina Program (1985)
(Tab padCaatan : Sheet perhitungan Kebutuhan PenjenuhanEo+P 7.55 7.67 7.60 7.35 6.28 7.32 7.30 7.45 7.23 7.30 7.53 6.97
Pejenuh 11.10 10.40 11.10 10.95 10.20 10.92 10.90 11.05 10.90 10.90 11.10 10.77
0.01 0.10 0.1 0.01 0.01
0.07 0.07
Lampiran 4 -1.
TABEL ZYLSTRAKEBUTUHAN PENJENUHAN PENDAHULUAN (AIR IRIGASI)
SELAMA PENYIAPAN LAHAN UNTUK PADI
Penguapan dan Perembesan (Eo + P) mm/hari
4.6 4.7 4.8 4.9 5.0 5.1 5.2 5.3 5.4 5.5 5.6 5.7 5.8
9.2 9.3 9.4 9.4 9.5 9.6 9.6 9.7 9.7 9.8 9.9 9.9 10.0
8.3 8.4 8.4 8.5 8.6 8.6 9.7 8.8 8.8 8.9 9.0 9.0 9.1
7.6 7.7 7.8 7.3 7.9 8.0 8.0 8.1 8.2 8.1 8.3 8.3 8.4
7.1 7.2 7.3 7.3 7.4 7.4 7.5 7.6 7.7 7.9 7.3 7.9 8.0
6.7 6.8 6.9 6.9 7.0 7.1 7.1 7.2 7.5 7.5 7.4 7.5 7.6
6.4 6.5 6.6 6.6 6.7 6.8 6.9 6.9 7.0 7.1 7.1 7.2 7.5
6.1 6.2 6.3 6.4 6.4 6.5 6.6 6.7 6.7 6.9 6.9 7.0 7.0
Penguapan dan Perembesan (Eo + P) mm/hari
7.1 7.2 7.3 7.4 7.5 7.6 7.7 7.8 7.9 8.0 8.1 8.2 8.3
10.8 10.9 10.9 11.0 11.1 11.1 11.2 11.3 11.3 11.4 11.5 11.5 11.6
9.9 10.0 10.1 10.1 10.2 10.3 10.4 10.4 10.5 10.6 10.6 10.7 10.8
9.3 9.4 9.5 9.5 9.6 9.7 9.8 9.5 9.9 10.0 10.0 10.1 10.2
8.9 8.9 9.0 9.1 9.2 9.2 9.3 9.4 9.5 9.5 9.6 9.7 9.8
8.5 8.6 8.7 8.7 8.8 8.9 9.0 9.0 9.1 9.2 9.3 9.4 9.4
8.2 8.2 8.4 8.5 8.5 8.6 8.7 8.7 8.9 8.9 9.0 9.1 9.2
8.0 8.1 8.2 8.3 8.3 8.4 8.5 8.6 8.7 8.7 8.8 8.9 9.0
Lampiran 4 -1.
TABEL ZYLSTRAKEBUTUHAN PENJENUHAN PENDAHULUAN (AIR IRIGASI)
SELAMA PENYIAPAN LAHAN UNTUK PADI
Penguapan dan Perembesan (Eo + P) mm/hari
5.9
10.0
9.2
8.5
8.0
7.7
7.4
7.1
Penguapan dan Perembesan (Eo + P) mm/hari
8.4 8.5 8.6 8.7 8.8 8.9 9.0
11.7 11.7 11.8 11.9 12.0 12.0 12.1
10.9 10.4 11.0 11.1 11.2 11.2 11.3
10.3 10.3 10.4 10.5 10.6 10.7 10.7
9.8 9.9 10.0 10.1 10.2 10.2 10.3
9.5 9.6 9.7 9.8 9.8 9.9 10.0
9.3 9.4 9.4 9.5 9.6 9.7 9.8
9.1 9.3 9.3 9.3 9.4 9.5 9.6
PERHITUNGAN CURAH HUJAN BULANAN RATA-RATA
STASIUN : KARANGDOWO
NO. STA. : 97
TAHUNB U L A N
JAN PEB MAR APR MEI JUN
2008 200 222 420 420 25 24
2009 110 180 305 306 89 0
2010 295 397 78 333 75 0
2011 425 340 256 256 194 0
2012 318 136 406 255 66 102
x 269.60 255.00 293.00 314.00 89.80 25.20
SD 119.85 109.85 138.42 68.02 62.93 44.17
R80% bulanan168.69 162.51 176.45 256.73 36.81 0.00
R80% harian 5.44 5.80 5.69 8.56 1.19 0.00
Catatan : x = Curah Hujan Bulanan Rata - Rata ( mm )
SD = Standar Deviasi =
R80% bulan = Curah Hujan Efektif 20 % Kering Bulanan ( mm )
_
= x + K . SD ; K = - 0,842
R80% haria = Curah Hujan Efektif 20 % Kering Harian ( mm )
= R5 bulanan / m m = Jumlah Hari Dalam Satu Bulan
√ X2−(∑ X )2 /nn−1
PERHITUNGAN CURAH HUJAN BULANAN RATA-RATA
STASIUN : KARANGDOWO
NO. STA. : 97
B U L A N
JUL AGU SEP OKT NOP DES
0 0 56 0 125 152
64 23 0 205 150 190
32 17 0 23 112 122
0 0 102 19 58 284
0 19 250 17 280 25
19.20 11.80 81.60 52.80 145.00 154.60
28.62 10.99 103.38 85.53 82.63 94.69
0.00 2.55 0.00 0.00 75.43 74.87
0.00 0.08 0.00 0.00 2.51 2.42
Curah Hujan Bulanan Rata - Rata ( mm )
; n = Jumlah Data
Curah Hujan Efektif 20 % Kering Bulanan ( mm )
Curah Hujan Efektif 20 % Kering Harian ( mm )
m = Jumlah Hari Dalam Satu Bulan
√ X2−(∑ X )2 /nn−1
KEBUTUHAN AIR IRIGASI UNTUK PADI PENDEKDENGAN SISTEM 1 GOLONGAN
DAERAH IRIGASI COLO BARAT (BENDUNG COLO)
B U L A N JAN Eto (dari penman) ( mm / hari ) 5.05
Eo = 1.1 X Eto ( mm / hari ) 5.55
P ( mm / hari ) 2.00
Eo + P ( mm / hari ) 7.55
Rh = HUJAN ( 20 % KERING ) ( mm / hari ) 5.02
FACTOR 1 0.16 0.80
HUJAN 2 0.53 4.00
DENGAN 3 0.35 1.76
1 GOLONGAN 4 0.4 Re = Fh X Rh 2.01
TIAP 2 5 0.4 ( mm / hari ) 2.01
MINGGU 6 0.4 2.01
( Fh ) 7 0.4 2.01
8 0.2 1.00
1 1.20 6.05
KOEFISIEN 2 1.27 6.41
TANAMAN 3 1.33 Etc = Kc X Eto 6.71
( Kc ) 4 1.30 ( mm / hari ) 6.56
5 1.15 5.80
6 0.00 0.00
PENGOLAHAN TANAH LP 11.10
2 MINGGU KE 1 LP-Re.1 A 10.30
A X 0,116 B 1.19
PENGOLAHAN TANAH LP 11.10
2 MINGGU KE 2 LP-Re.2 A 7.10
A x 0.116 B 0.82
KEBUTUHAN AIR ETc.1-Re.3+P+ A 9.63
2 MINGGU KE 1 A x 0.116 B 1.12
W = 3.33 (mm / hari)
KEBUTUHAN AIR ETc.2-Re.4+P+ A 9.73
2 MINGGU KE 2 A x 0.116 B 1.13
W = 3.33 (mm / hari)
KEBUTUHAN AIR ETc.3-Re.5+P+ A 10.03
2 MINGGU KE 3 A x 0.116 B 1.16
W = 3.33 (mm / hari)
KEBUTUHAN AIR ETc.4-Re.6+P+ A 9.88
2 MINGGU KE 4 A x 0.116 B 1.15
W = 3.33 (mm / hari)
KEBUTUHAN AIR ETc.5-Re.7+P A 5.79
2 MINGGU KE 5 A x 0.116 B 0.67
W = 3.33 (mm / hari)
KEBUTUHAN AIR ETc.6-Re.8+P A 1.00
2 MINGGU KE 6 A x 0.116 B 0.12
W = 3.33 (mm / hari)
Catatan :
A = kebutuhan air (mm/hari)
B = Kebutuhan air (lt/dt/ha)
KEBUTUHAN AIR IRIGASI UNTUK PADI PENDEKDENGAN SISTEM 1 GOLONGAN
DAERAH IRIGASI COLO BARAT (BENDUNG COLO)
PEB MAR APR MEI JUN JUL AGU SEP5.15 5.09 4.86 3.89 4.84 4.82 4.95 4.75
5.67 5.60 5.35 4.28 5.32 5.30 5.45 5.23
2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
7.67 7.60 7.35 6.28 7.32 7.30 7.45 7.23
4.57 5.60 4.67 0.80 0.00 0.00 0.05 0.07
0.73 0.90 0.75 0.13 0.00 0.00 0.01 0.01
4.07 4.03 3.90 3.33 3.88 3.87 3.95 3.83
1.60 1.96 1.63 0.28 0.00 0.00 0.02 0.02
1.83 2.24 1.87 0.32 0.00 0.00 0.02 0.03
1.83 2.24 1.87 0.32 0.00 0.00 0.02 0.03
1.83 2.24 1.87 0.32 0.00 0.00 0.02 0.03
1.83 2.24 1.87 0.32 0.00 0.00 0.02 0.03
0.91 1.12 0.93 0.16 0.00 0.00 0.01 0.01
6.19 6.11 5.84 4.67 5.80 5.78 5.95 5.71
6.55 6.47 6.18 4.94 6.14 6.12 6.29 6.04
6.86 6.77 6.47 5.17 6.43 6.41 6.59 6.32
6.70 6.62 6.32 5.06 6.29 6.26 6.44 6.18
5.93 5.85 5.59 4.47 5.56 5.54 5.70 5.47
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10.40 11.10 10.95 10.20 10.92 10.90 11.05 10.90
9.67 10.20 10.20 10.07 10.92 10.90 11.04 10.89
1.12 1.18 1.18 1.17 1.27 1.26 1.28 1.26
10.40 11.10 10.95 10.20 10.92 10.90 11.05 10.90
6.33 7.07 7.05 6.87 7.04 7.03 7.10 7.07
0.73 0.82 0.82 0.80 0.82 0.82 0.82 0.82
9.92 9.48 9.53 9.72 11.13 11.11 11.26 11.01
1.15 1.10 1.11 1.13 1.29 1.29 1.31 1.28
10.05 9.56 9.64 9.95 11.47 11.45 11.60 11.34
1.17 1.11 1.12 1.15 1.33 1.33 1.35 1.32
10.36 9.86 9.93 10.18 11.76 11.74 11.90 11.63
1.20 1.14 1.15 1.18 1.36 1.36 1.38 1.35
10.20 9.71 9.78 10.07 11.62 11.59 11.75 11.48
1.18 1.13 1.14 1.17 1.35 1.34 1.36 1.33
6.10 5.61 5.73 6.15 7.56 7.54 7.68 7.44
0.71 0.65 0.66 0.71 0.88 0.87 0.89 0.86
1.09 0.88 1.07 1.84 2.00 2.00 1.99 1.99
0.13 0.10 0.12 0.21 0.23 0.23 0.23 0.23
KEBUTUHAN AIR IRIGASI UNTUK PADI PENDEKDENGAN SISTEM 1 GOLONGAN
DAERAH IRIGASI COLO BARAT (BENDUNG COLO)
OKT NOP DES4.82 5.03 4.52
5.30 5.53 4.97
2.00 2.00 2.00
7.30 7.53 6.97
0.02 0.80 2.56
0.00 0.13 0.41
3.87 3.99 3.69
0.01 0.28 0.90
0.01 0.32 1.02
0.01 0.32 1.02
0.01 0.32 1.02
0.01 0.32 1.02
0.00 0.16 0.51
5.78 6.03 5.42
6.12 6.38 5.74
6.41 6.69 6.01
6.26 6.54 5.87
5.54 5.78 5.20
0.00 0.00 0.00
10.90 11.10 10.77
10.90 10.97 10.36
1.26 1.27 1.20
10.90 11.10 10.77
7.03 7.11 7.08
0.82 0.82 0.82
11.10 11.08 9.86
1.29 1.29 1.14
11.44 11.39 10.04
1.33 1.32 1.17
11.73 11.70 10.32
1.36 1.36 1.20
11.59 11.55 10.18
1.34 1.34 1.18
7.53 7.46 6.17
0.87 0.87 0.72
2.00 1.84 1.49
0.23 0.21 0.17
Lampiran 5.4a.KEBUTUHAN AIR SELAMA PENGOLAHAN TANAH UNTUK PALAWIJA
B U L A N JAN PEB MAR APR MEI
Eto (dari penman) 5.05 5.15 5.09 4.86 3.89
Eo 5.55 5.67 5.60 5.35 4.28
M = Eo + P 7.55 7.67 7.60 7.35 6.28
k = MT / S 2.27 2.30 2.28 2.21 1.88
9.63 9.98 9.78 9.07 6.58
8.42 8.52 8.47 8.26 7.41
ek
IR = M ek/ (ek - 1)
Lampiran 5.4a.KEBUTUHAN AIR SELAMA PENGOLAHAN TANAH UNTUK PALAWIJA
JUN JUL AGU SEP OKT NOP DES
4.84 4.82 4.95 4.75 4.82 5.03 4.52
5.32 5.30 5.45 5.23 5.30 5.53 4.97 Eo = 1.1 Eto
7.32 7.30 7.45 7.23 7.30 7.53 6.97 P = 2.00 mm/hari
T = 15 hari
2.20 2.19 2.24 2.17 2.19 2.26 2.09 S = 50 mm
8.99 8.94 9.35 8.75 8.94 9.57 8.09
8.24 8.22 8.34 8.16 8.22 8.41 7.95 mm/hari
Faktor Koreksi ET Tanaman
Curah Hujan Mean 12.5 25 37.5 50 62.5 75 87.5
Bulanan (mm)
Curah Hujan Efektif Rata-rata Bulanan (mm)
ET Tanaman 25 8 16 24 0 0 0 0
Rata-rata 50 8 17 25 32 37 46 0
Bulanan 75 9 18 27 34 41 48 56
(mm) 100 9 19 28 35 43 52 59
125 10 20 30 37 46 54 62
150 10 21 31 39 49 57 66
175 11 23 32 42 52 61 69
200 11 24 33 44 54 64 73
225 12 25 35 47 57 68 78
250 13 25 38 50 60 72 84
Tampungan Efektif 20 25 38 50 63 75
Faktor Tampungan 0.73 0.77 0.86 0.93 0.97 1.00
168.6888 162.5102 176.4537 256.729 36.8095 0 0Et mm/bln 179.8705 165.9764 181.4909 167.795 138.711 166.85 171.77Interpolasi 1 121.96 112.01 126.93 133.00 29.45 10.00 10.00Interpolasi 2 129.46 118.01 134.93 141.00 30.45 11.00 11.00Interpolasi 3 123.42 115.84 129.01 138.69 30.00 10.67 10.87
Faktor Koreksi ET Tanaman
100 112.5 125 137.5 150 ### 175 ### 200
Curah Hujan Efektif Rata-rata Bulanan (mm)
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
62 69 0 0 0 0 0 0 0
66 73 80 87 94 100 0 0 0
70 76 85 92 98 107 116 120 0
74 81 89 97 104 112 119 127 133
78 86 95 103 111 118 126 134 141
82 91 100 109 117 125 134 142 150
87 96 106 115 124 132 141 150 159
92 102 112 121 132 140 150 158 167
100 125 150 175 200
1.02 1.04 1.06 1.07 1.08
2.54949 0 0 75.429 74.873176.63 164.03 171.768 173.44 161.0711.00 10.00 10.00 57.31 32.5611.00 11.00 11.00 61.27 33.5011.00 10.56 10.87 61.03 32.98
Lampiran 5.7.
HUJAN EFEKTIF UNTUK PALAWIJA
NO B U L A N JAN PEB MAR
1 168.69 162.51 176.45
2 179.87 165.98 181.49
3 Faktor Tampungan 1.06 1.06 1.06
4 123.42 115.84 129.01
5 130.83 122.79 136.75
Re ( mm / hari ) 4.22 4.39 4.41
0 12.5 1500 10.00 9
12.50 25.0010.00 1.00
0.8 0.00 0.04
Hujan Bulanan ( 20 % kering)
ET Crop Rata-rata Bulanan
Hujan Efektif Bulanan (mm)
Koreksi Hujan Efektif (mm)
Lampiran 5.7.
HUJAN EFEKTIF UNTUK PALAWIJA
APR MEI JUN JUL AGU SEP OKT NOP
256.73 36.81 0.00 0.00 2.55 0.00 0.00 75.43
167.80 138.71 166.85 171.77 176.63 164.03 171.77 173.44
1.06 1.06 1.06 1.06 1.06 1.06 1.06 1.06
138.69 30.00 10.67 10.87 11.00 10.56 10.87 61.03
147.02 31.80 11.31 11.52 11.66 11.19 37.08 87.53
4.90 1.03 0.38 0.37 0.38 0.37 1.20 2.92
17510.00
9.87 9.87
Lampiran 5.7.
HUJAN EFEKTIF UNTUK PALAWIJA
DES KETERANGAN
74.87
ETc x c x n hari ( mm )
161.07 --- > ( c = 1.15 )
Tabel A.2.7 hal. 174
1.06 Buku KP-01
Tabel A.2.7 hal. 174
32.98 Buku KP-01
118.69 (5) = (3) x (4)
3.83 (5) : n hari
Lampiran 5 - 11 gKEBUTUHAN AIR IRIGASI UNTUK TANAMAN PALAWIJA ( KACANG TANAH )
DAERAH IRIGASI CIJANGKELOK
B U L A N JAN PEB MAREto (penman) ( mm / hari ) 0.50 0.52 0.51
Eo = 1,1 x Eto ( mm / hari ) 5.55 5.67 5.60
Re terkoreksi ( Re.t ) ( mm / hari ) 4.22 4.39 4.41
1 0.5 EVAPOTRAN- 3.19 3.26 3.22
Koefisie 2 0.59 SPIRASI 3.77 3.85 3.80
Tanaman 3 0.96 TANAMAN 6.13 6.26 6.18
( Kc ) 4 1.05 Etc = 6.70 6.85 6.76
5 1.02 Eo X Kc X 1.15 6.51 6.65 6.57
6 0.95 6.06 6.19 6.12
PENGOLAHAN TANA IR 9.38 9.31 9.36
50 mm IR-Re.t A 5.16 4.92 4.95
SELAMA 15 HARI A x 0.116 B 0.60 0.57 0.57
P E R T U M B U H A N
KEBUTUHAN AIR ETc.1-Re.t A 0.00 0.00 0.00
2 MINGGU KE 1 A x 0.116 B 0.00 0.00 0.00
KEBUTUHAN AIR ETc.2-Re.t A 0.00 0.00 0.00
2 MINGGU KE 2 A x 0.116 B 0.00 0.00 0.00
KEBUTUHAN AIR ETc.3-Re.t A 1.91 1.87 1.77
2 MINGGU KE 3 A x 0.116 B 0.22 0.22 0.21
KEBUTUHAN AIR ETc.4-Re.t A 2.48 2.46 2.35
2 MINGGU KE 4 A x 0.116 B 0.29 0.29 0.27
KEBUTUHAN AIR ETc.5-Re.t A 2.29 2.27 2.16
2 MINGGU KE 5 A x 0.116 B 0.27 0.26 0.25
KEBUTUHAN AIR ETc.6-Re.t A 1.84 1.81 1.71
2 MINGGU KE 6 A x 0.116 B 0.21 0.21 0.20 Catatan : A = kebutuhan air ( mm / hari ) B = kebutuhan air ( lt / dt / ha )
Lampiran 5 - 11 gKEBUTUHAN AIR IRIGASI UNTUK TANAMAN PALAWIJA ( KACANG TANAH )
DAERAH IRIGASI CIJANGKELOK
APR MEI JUN JUL AGU SEP OKT NOP DES0.49 0.39 0.48 0.48 0.50 0.48 0.48 0.50 0.45
5.35 4.28 5.32 5.30 5.45 5.23 5.30 5.53 4.97
4.90 1.03 0.38 0.37 0.38 0.37 1.20 2.92 3.83
3.08 2.46 3.06 3.05 3.13 3.01 3.05 3.18 2.86
3.63 2.90 3.61 3.60 3.70 3.55 3.60 3.75 3.37
5.91 4.73 5.87 5.85 6.02 5.77 5.85 6.11 5.49
6.46 5.17 6.42 6.40 6.58 6.32 6.40 6.68 6.00
6.28 5.02 6.24 6.22 6.39 6.13 6.22 6.49 5.83
5.84 4.68 5.81 5.79 5.95 5.71 5.79 6.04 5.43
9.09 9.03 9.07 9.03 9.18 8.91 9.04 9.24 9.19
4.19 8.01 8.69 8.65 8.80 8.53 7.85 6.32 5.37
0.49 0.93 1.01 1.00 1.02 0.99 0.91 0.73 0.62
0.00 1.44 2.68 2.68 2.76 2.63 1.85 0.26 0.00
0.00 0.17 0.31 0.31 0.32 0.31 0.21 0.03 0.00
0.00 1.88 3.23 3.22 3.32 3.18 2.40 0.83 0.00
0.00 0.22 0.37 0.37 0.39 0.37 0.28 0.10 0.00
1.01 3.70 5.50 5.48 5.64 5.40 4.66 3.19 1.66
0.12 0.43 0.64 0.64 0.65 0.63 0.54 0.37 0.19
1.56 4.14 6.05 6.03 6.20 5.94 5.20 3.76 2.17
0.18 0.48 0.70 0.70 0.72 0.69 0.60 0.44 0.25
1.38 3.99 5.86 5.85 6.02 5.76 5.02 3.57 2.00
0.16 0.46 0.68 0.68 0.70 0.67 0.58 0.41 0.23
0.94 3.65 5.43 5.42 5.58 5.34 4.59 3.12 1.60
0.11 0.42 0.63 0.63 0.65 0.62 0.53 0.36 0.19
RENCANA POLA TANAMDAERAH IRIGASI _______ HA
UNTUK AREAL POTENSIAL DENGAN SISTEM 1 GOLONGAN
U R A I A NOKTOBER
I II
DAERAH IRIGASI
GOLONGAN I
LUAS AREAL = 2.816 Ha
0.00 1.26
lt / dt / ha 1.26 0.82
KEBUTUHAN AIR ( lt /dt / ha ) RATA-RATA 0.63 1.04
RATA-RATA 0.42 0.69
KEBUTUHAN AIR ( lt / dt / ha ) 0.63 1.04
UNTUK `1 GOLONGAN DI PETAK SAWAH
SALURAN TERSIER ( lt / dt / ha ) 0.76 1.25
SALURAN SEKUNDER ( lt / dt / ha ) 0.89 1.47
SALURAN PRIMER ( lt / dt / ha ) 0.97 1.59
0.64 1.06
UNTUK 3 GOLONGAN DI SALURAN PRIMER
(0.51) (0.51)
KEANDALAN ( % ) (79.73) (48.46)
CATATAN:
DEBIT ANDALAN DARI PENCATATAN DEBIT SUNGAI NORMAL 1/2 BULANAN RATA-RATA
DI LOKASI BENDUNG COLO ( TH 1986 - TH 2004 )
DEBIT KEBUTUHAN AIR ( m3 / dt )
DEBIT KEBUTUHAN AIR ( m3 / dt )
DEBIT ANDALAN (m3 / dt )
URAIANOKTOBER
I II
0.64 1.06
UNTUK 3 GOLONGAN DI SALURAN PRIMER
-0.51 -0.51
KEANDALAN ( % ) -79.73 -48.46
KEBUTUHAN AIR ( m3 / dt )
DEBIT ANDALAN (m3 / dt )
IISEPTEMBER
I
IIAGUSTUS
I
IIJULI I
IIJUNI I
IIMEI I
IIAPRIL I
IIMARE
TI
IIPE-BRUARI
I
IIJAN
UARII
IIDE-SEMBER
I
IINOPEMBER
I
IIOKTOBER
I
-1.00
0.00
1.00
2.00
3.00
4.00
5.00
0.6
4
1.0
6
1.0
8
1.3
3
1.2
0
1.2
1
0.9
3
0.4
0
0.6
4
0.9
5
0.9
8
1.1
2
1.1
6
1.1
7
0.9
6
0.4
7
0.6
3
0.6
7
0.3
5
0.5
1
0.7
0
0.7
2
0.6
6
0.3
2
-0.5
1
-0.5
1
0.6
5
0.6
5
0.8
5
0.8
5 2.2
4
2.2
4
2.7
3
2.7
3
2.9
9
2.9
9 4
.61
4.6
1
0.7
4
0.7
4
0.4
1
0.4
1
0.1
6
0.1
6
0.0
7
0.0
7
-0.3
4
-0.3
4
GRAFIK NERACA AIR (WATER BALANCE) RENCANA POLA TANAMDAERAH IRIGASI
LUAS TANAM AREAL POTENSIAL = HA
KEBUTUHAN AIR ( m3 / dt ) DEBIT ANDALAN (m3 / dt )
DEB
IT (
m3/d
et)
CATATAN :
DEBIT ANDALAN DARI PENCATATAN DEBIT NORMAL 1/2 BULANAN RATA-RATA
DILOKASI BENDUNG COLO UNTUK INTAKE COLO BARAT ( TH 1986 - TH 2005 )
URAIANOKTOBER
I II
0.00 0.00
UNTUK 3 GOLONGAN DI SALURAN PRIMER
0.00 0.00
KEANDALAN ( % ) 0.00 0.00
CATATAN :
DEBIT ANDALAN DARI PENCATATAN DEBIT NORMAL 1/2 BULANAN RATA-RATA
DILOKASI BENDUNG COLO UNTUK INTAKE COLO BARAT ( TH 1986 - TH 2005 )
KEBUTUHAN AIR ( m3 / dt )
DEBIT ANDALAN (m3 / dt )
RENCANA POLA TANAMDAERAH IRIGASI _______ HA
UNTUK AREAL POTENSIAL DENGAN SISTEM 1 GOLONGAN
NOPEMBER DESEMBER JANUARI PEBRUARI MARET
I II I II I II I II I
0.82 1.29 1.17 1.20 1.15 0.67 0.13 1.12 0.82
1.29 1.32 1.20 1.18 0.67 0.12 1.12 0.73 1.10
1.06 1.30 1.18 1.19 0.91 0.39 0.62 0.93 0.96
0.70 0.87 0.79 0.79 0.61 0.26 0.42 0.62 0.64
1.06 1.30 1.18 1.19 0.91 0.39 0.62 0.93 0.96
1.27 1.56 1.42 1.43 1.09 0.47 0.75 1.11 1.15
1.49 1.85 1.67 1.68 1.29 0.56 0.88 1.31 1.36
1.61 1.99 1.81 1.82 1.39 0.60 0.95 1.42 1.47
1.08 1.33 1.20 1.21 0.93 0.40 0.64 0.95 0.98
0.65 0.65 0.85 0.85 2.24 2.24 2.73 2.73 2.99
60.09 48.63 70.80 70.33 100.00 100.00 100.00 100.00 100.00
DEBIT ANDALAN DARI PENCATATAN DEBIT SUNGAI NORMAL 1/2 BULANAN RATA-RATA
PADI = 666,22 HA
NOPEMBER DESEMBER JANUARI PEBRUARI MARET
I II I II I II I II I
1.08 1.33 1.20 1.21 0.93 0.40 0.64 0.95 0.98
0.65 0.65 0.85 0.85 2.24 2.24 2.73 2.73 2.99
60.09 48.63 70.80 70.33 100.00 100.00 100.00 100.00 100.00
II
SEPTEMBER
I
IIAGUSTUS
I
IIJULI I
IIJUNI I
IIMEI I
IIAPRIL I
IIMARE
TI
IIPE-BRUARI
I
IIJAN
UARII
IIDE-SEMBER
I
IINOPEMBER
I
IIOKTOBER
I
-1.00
0.00
1.00
2.00
3.00
4.00
5.00
0.6
4
1.0
6
1.0
8
1.3
3
1.2
0
1.2
1
0.9
3
0.4
0
0.6
4
0.9
5
0.9
8
1.1
2
1.1
6
1.1
7
0.9
6
0.4
7
0.6
3
0.6
7
0.3
5
0.5
1
0.7
0
0.7
2
0.6
6
0.3
2
-0.5
1
-0.5
1
0.6
5
0.6
5
0.8
5
0.8
5 2.2
4
2.2
4
2.7
3
2.7
3
2.9
9
2.9
9 4
.61
4.6
1
0.7
4
0.7
4
0.4
1
0.4
1
0.1
6
0.1
6
0.0
7
0.0
7
-0.3
4
-0.3
4
GRAFIK NERACA AIR (WATER BALANCE) RENCANA POLA TANAMDAERAH IRIGASI
LUAS TANAM AREAL POTENSIAL = HA
KEBUTUHAN AIR ( m3 / dt ) DEBIT ANDALAN (m3 / dt )
DEB
IT (
m3/d
et)
DEBIT ANDALAN DARI PENCATATAN DEBIT NORMAL 1/2 BULANAN RATA-RATA
DILOKASI BENDUNG COLO UNTUK INTAKE COLO BARAT ( TH 1986 - TH 2005 )
NOPEMBER DESEMBER JANUARI PEBRUARI MARET
I II I II I II I II I
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
DEBIT ANDALAN DARI PENCATATAN DEBIT NORMAL 1/2 BULANAN RATA-RATA
DILOKASI BENDUNG COLO UNTUK INTAKE COLO BARAT ( TH 1986 - TH 2005 )
RENCANA POLA TANAMDAERAH IRIGASI _______ HA
UNTUK AREAL POTENSIAL DENGAN SISTEM 1 GOLONGAN
MARET APRIL MEI JUNI JULI
II I II I II I II I II
1.10 1.12 1.15 1.17 0.71 0.23 1.01 0.31 0.37
1.11 1.15 1.14 0.71 0.21 1.01 0.31 0.37 0.64
1.10 1.14 1.14 0.94 0.46 0.62 0.66 0.34 0.50
0.74 0.76 0.76 0.63 0.31 0.41 0.44 0.23 0.34
1.10 1.14 1.14 0.94 0.46 0.62 0.66 0.34 0.50
1.32 1.36 1.37 1.13 0.56 0.74 0.79 0.41 0.61
1.56 1.61 1.62 1.33 0.66 0.88 0.93 0.48 0.71
1.69 1.74 1.75 1.44 0.71 0.95 1.01 0.52 0.77
1.12 1.16 1.17 0.96 0.47 0.63 0.67 0.35 0.51
2.99 4.61 4.61 0.74 0.74 0.41 0.41 0.16 0.16
100.00 100.00 100.00 76.90 100.00 64.65 60.78 46.28 31.37
PADI = 666,22 HA PALAWIJA = 666,22 HA
MARET APRIL MEI JUNI JULI
II I II I II I II I II
1.12 1.16 1.17 0.96 0.47 0.63 0.67 0.35 0.51
2.99 4.61 4.61 0.74 0.74 0.41 0.41 0.16 0.16
100.00 100.00 100.00 76.90 100.00 64.65 60.78 46.28 31.37
II
SEPTEMBER
I
IIAGUSTUS
I
IIJULI I
IIJUNI I
IIMEI I
IIAPRIL I
IIMARE
TI
IIPE-BRUARI
I
IIJAN
UARII
IIDE-SEMBER
I
IINOPEMBER
I
IIOKTOBER
I
-1.00
0.00
1.00
2.00
3.00
4.00
5.00
0.6
4
1.0
6
1.0
8
1.3
3
1.2
0
1.2
1
0.9
3
0.4
0
0.6
4
0.9
5
0.9
8
1.1
2
1.1
6
1.1
7
0.9
6
0.4
7
0.6
3
0.6
7
0.3
5
0.5
1
0.7
0
0.7
2
0.6
6
0.3
2
-0.5
1
-0.5
1
0.6
5
0.6
5
0.8
5
0.8
5 2.2
4
2.2
4
2.7
3
2.7
3
2.9
9
2.9
9 4
.61
4.6
1
0.7
4
0.7
4
0.4
1
0.4
1
0.1
6
0.1
6
0.0
7
0.0
7
-0.3
4
-0.3
4
GRAFIK NERACA AIR (WATER BALANCE) RENCANA POLA TANAMDAERAH IRIGASI
LUAS TANAM AREAL POTENSIAL = HA
KEBUTUHAN AIR ( m3 / dt ) DEBIT ANDALAN (m3 / dt )
DEB
IT (
m3/d
et)
MARET APRIL MEI JUNI JULI
II I II I II I II I II
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
RENCANA POLA TANAMDAERAH IRIGASI _______ HA
UNTUK AREAL POTENSIAL DENGAN SISTEM 1 GOLONGAN
AGUSTUS SEPTEMBERKETERANGAN
I II I II
LUAS AREAL TANAM :
GOLONGAN I : 666.22 Ha
MASA TANAM I PADI
666.22
0.65 0.72 0.67 0.62 MASA TANAM II PADI
0.72 0.70 0.62 0.00 666.62
MASA TANAM III PALAWIJA
666.62
0.69 0.71 0.64 0.31
0.46 0.47 0.43 0.21 = MASA PERTUMBUHAN
0.69 0.71 0.64 0.31 = PENGOLAHAN TANAH
= PENGERINGAN
0.82 0.85 0.77 0.37 Koefisien :
0.97 1.00 0.91 0.44 - Saluran Tersier = 1.20
1.05 1.08 0.98 0.47 - Saluran Sekunder = 1.18
- Saluran Primer = 1.08
0.70 0.72 0.66 0.32
Kebutuhan Air ( lt / dt / ha ) :
- Petak Sawah = 1.30
0.07 0.07 (0.34) (0.34) - Saluran Tersier = 1.56
- Saluran Sekunder = 1.85
10.57 10.25 (52.57) (109.29) - Saluran Primer = 1.99
PALAWIJA = 666,22 HA
AGUSTUS SEPTEMBER
I II I II
0.70 0.72 0.66 0.32
0.07 0.07 -0.34 -0.34
10.57 10.25 -52.57 -109.29
II
SEPTEMBER
I
IIAGUSTUS
I
IIJULI I
IIJUNI I
IIMEI I
IIAPRIL I
IIMARE
TI
IIPE-BRUARI
I
IIJAN
UARII
IIDE-SEMBER
I
IINOPEMBER
I
IIOKTOBER
I
-1.00
0.00
1.00
2.00
3.00
4.00
5.00
0.6
4
1.0
6
1.0
8
1.3
3
1.2
0
1.2
1
0.9
3
0.4
0
0.6
4
0.9
5
0.9
8
1.1
2
1.1
6
1.1
7
0.9
6
0.4
7
0.6
3
0.6
7
0.3
5
0.5
1
0.7
0
0.7
2
0.6
6
0.3
2
-0.5
1
-0.5
1
0.6
5
0.6
5
0.8
5
0.8
5 2.2
4
2.2
4
2.7
3
2.7
3
2.9
9
2.9
9 4
.61
4.6
1
0.7
4
0.7
4
0.4
1
0.4
1
0.1
6
0.1
6
0.0
7
0.0
7
-0.3
4
-0.3
4
GRAFIK NERACA AIR (WATER BALANCE) RENCANA POLA TANAMDAERAH IRIGASI
LUAS TANAM AREAL POTENSIAL = HA
KEBUTUHAN AIR ( m3 / dt ) DEBIT ANDALAN (m3 / dt )
DEB
IT (
m3/d
et)
AGUSTUS SEPTEMBER
I II I II
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
GOL 1 GOL 2 GOL 3INDUK 1174.5 2,816.00 1,684.50 #REF! Potensial
LS1 223 2,816.00 1,007.00 #REF! Fungsional
LS2 686.5 #REF!
LS2A 161 #REF!
LS3 224
LS4 347LS5 210.00 LS5A 1231.5 677.5LS SUB 5A 44
LS6 199
Lebo
26.449
= MASA PERTUMBUHAN 85.795
23.408
= PENGOLAHAN TANAH 69.387
44.898
249.937
Kebondalem
93.427
24.149
46.938
51.308
215.822
Tanjungsari
59.183
18.669
77.852
Tambaksari
44.798
21.506
25.367
91.671
Tanjunganom30.938
30.938
666.220
RENCANA POLA TANAMDAERAH IRIGASI _______ HA
UNTUK AREAL POTENSIAL DENGAN SISTEM 1 GOLONGAN
U R A I A NJANUARI
I II
DAERAH IRIGASI
GOLONGAN I
LUAS AREAL = 2.816 Ha
0.00 1.19
lt / dt / ha 1.19 0.82
KEBUTUHAN AIR ( lt /dt / ha ) RATA-RATA 0.60 1.01
RATA-RATA 0.40 0.67
KEBUTUHAN AIR ( lt / dt / ha ) 0.60 1.01
UNTUK `1 GOLONGAN DI PETAK SAWAH
SALURAN TERSIER ( lt / dt / ha ) 0.72 1.21
SALURAN SEKUNDER ( lt / dt / ha ) 0.85 1.43
SALURAN PRIMER ( lt / dt / ha ) 0.91 1.54
0.61 1.03
UNTUK 3 GOLONGAN DI SALURAN PRIMER
(0.51) (0.51)
KEANDALAN ( % ) (84.38) (49.94)
CATATAN:
DEBIT ANDALAN DARI PENCATATAN DEBIT SUNGAI NORMAL 1/2 BULANAN RATA-RATA
DI LOKASI BENDUNG COLO ( TH 1986 - TH 2004 )
DEBIT KEBUTUHAN AIR ( m3 / dt )
DEBIT KEBUTUHAN AIR ( m3 / dt )
DEBIT ANDALAN (m3 / dt )
URAIANJANUARI
I II
0.61 1.03
UNTUK 3 GOLONGAN DI SALURAN PRIMER
-0.51 -0.51
KEANDALAN ( % ) -84.376235 -49.94
KEBUTUHAN AIR ( m3 / dt )
DEBIT ANDALAN (m3 / dt )
IIDE-SEMBER
I
IINOPEMBER
I
IIOKTOBER
I
IISEPTEMBER
I
IIAGUSTUS
I
IIJULI I
IIJUNI I
IIMEI I
IIAPRIL I
IIMARE
TI
IIFEBRUARI
I
IIJAN
UARII
-1.00
0.00
1.00
2.00
3.00
4.00
5.00
0.6
1
1.0
3
0.9
6
1.1
8
1.1
5
1.1
6
0.9
2
0.4
0
0.7
0
1.0
0
1.0
7
1.3
4
1.3
7
1.3
8
1.1
5
0.5
7
0.6
2
0.6
6
0.2
5
0.4
2
0.4
1
0.4
3
0.2
1
0.0
9
-0.5
1
-0.5
1
0.6
5
0.6
5
0.8
5
0.8
5 2.2
4
2.2
4
2.7
3
2.7
3
2.9
9
2.9
9 4.6
1
4.6
1
0.7
4
0.7
4
0.4
1
0.4
1
0.1
6
0.1
6
0.0
7
0.0
7
-0.3
4
-0.3
4
GRAFIK NERACA AIR (WATER BALANCE) RENCANA POLA TANAMDAERAH IRIGASI
LUAS TANAM AREAL POTENSIAL = HA
KEBUTUHAN AIR ( m3 / dt ) DEBIT ANDALAN (m3 / dt )
DEB
IT (
m3/d
et)
CATATAN :
DEBIT ANDALAN DARI PENCATATAN DEBIT NORMAL 1/2 BULANAN RATA-RATA
DILOKASI BENDUNG COLO UNTUK INTAKE COLO BARAT ( TH 1986 - TH 2005 )
URAIANOKTOBER
I II
0.00 0.00
UNTUK 3 GOLONGAN DI SALURAN PRIMER
0.00 0.00
KEANDALAN ( % ) 0.00 0.00
CATATAN :
DEBIT ANDALAN DARI PENCATATAN DEBIT NORMAL 1/2 BULANAN RATA-RATA
DILOKASI BENDUNG COLO UNTUK INTAKE COLO BARAT ( TH 1986 - TH 2005 )
KEBUTUHAN AIR ( m3 / dt )
DEBIT ANDALAN (m3 / dt )
RENCANA POLA TANAMDAERAH IRIGASI _______ HA
UNTUK AREAL POTENSIAL DENGAN SISTEM 1 GOLONGAN
FEBRUARI MARET APRIL MEI JUNI
I II I II I II I II I
0.73 1.15 1.11 1.14 1.14 0.66 0.21 1.17 0.82
1.15 1.17 1.14 1.13 0.66 0.12 1.17 0.80 1.29
0.94 1.16 1.13 1.14 0.90 0.39 0.69 0.98 1.05
0.63 0.77 0.75 0.76 0.60 0.26 0.46 0.65 0.70
0.94 1.16 1.13 1.14 0.90 0.39 0.69 0.98 1.05
1.13 1.39 1.35 1.36 1.08 0.47 0.83 1.18 1.26
1.33 1.64 1.59 1.61 1.27 0.56 0.98 1.39 1.49
1.44 1.77 1.72 1.74 1.38 0.60 1.06 1.50 1.61
0.96 1.18 1.15 1.16 0.92 0.40 0.70 1.00 1.07
0.65 0.65 0.85 0.85 2.24 2.24 2.73 2.73 2.99
67.26 54.75 74.23 73.66 100.00 100.00 100.00 100.00 100.00
DEBIT ANDALAN DARI PENCATATAN DEBIT SUNGAI NORMAL 1/2 BULANAN RATA-RATA
PADI = 666,22 HA
FEBRUARI MARET APRIL MEI JUNI
I II I II I II I II I
0.96 1.18 1.15 1.16 0.92 0.40 0.70 1.00 1.07
0.65 0.65 0.85 0.85 2.24 2.24 2.73 2.73 2.99
67.26 54.75 74.23 73.66 100.00 100.00 100.00 100.00 100.00
II
DE-SEMBER
I
IINOPEMBER
I
IIOKTOBER
I
IISEPTEMBER
I
IIAGUSTUS
I
IIJULI I
IIJUNI I
IIMEI I
IIAPRIL I
IIMARE
TI
IIFEBRUARI
I
IIJAN
UARII
-1.00
0.00
1.00
2.00
3.00
4.00
5.00
0.6
1
1.0
3
0.9
6
1.1
8
1.1
5
1.1
6
0.9
2
0.4
0
0.7
0
1.0
0
1.0
7
1.3
4
1.3
7
1.3
8
1.1
5
0.5
7
0.6
2
0.6
6
0.2
5
0.4
2
0.4
1
0.4
3
0.2
1
0.0
9
-0.5
1
-0.5
1
0.6
5
0.6
5
0.8
5
0.8
5 2.2
4
2.2
4
2.7
3
2.7
3
2.9
9
2.9
9 4.6
1
4.6
1
0.7
4
0.7
4
0.4
1
0.4
1
0.1
6
0.1
6
0.0
7
0.0
7
-0.3
4
-0.3
4
GRAFIK NERACA AIR (WATER BALANCE) RENCANA POLA TANAMDAERAH IRIGASI
LUAS TANAM AREAL POTENSIAL = HA
KEBUTUHAN AIR ( m3 / dt ) DEBIT ANDALAN (m3 / dt )
DEB
IT (
m3/d
et)
DEBIT ANDALAN DARI PENCATATAN DEBIT NORMAL 1/2 BULANAN RATA-RATA
DILOKASI BENDUNG COLO UNTUK INTAKE COLO BARAT ( TH 1986 - TH 2005 )
NOPEMBER DESEMBER JANUARI PEBRUARI MARET
I II I II I II I II I
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
DEBIT ANDALAN DARI PENCATATAN DEBIT NORMAL 1/2 BULANAN RATA-RATA
DILOKASI BENDUNG COLO UNTUK INTAKE COLO BARAT ( TH 1986 - TH 2005 )
RENCANA POLA TANAMDAERAH IRIGASI _______ HA
UNTUK AREAL POTENSIAL DENGAN SISTEM 1 GOLONGAN
JUNI JULI AGUSTUS SEPTEMBER OKTOBER
II I II I II I II I II
1.29 1.33 1.36 1.36 0.89 0.23 0.99 0.21 0.28
1.33 1.36 1.34 0.89 0.23 0.99 0.31 0.28 0.54
1.31 1.34 1.35 1.13 0.56 0.61 0.65 0.25 0.41
0.87 0.90 0.90 0.75 0.37 0.41 0.43 0.16 0.27
1.31 1.34 1.35 1.13 0.56 0.61 0.65 0.25 0.41
1.57 1.61 1.62 1.35 0.67 0.73 0.78 0.30 0.49
1.86 1.90 1.92 1.60 0.79 0.86 0.92 0.35 0.58
2.01 2.06 2.07 1.72 0.86 0.93 0.99 0.38 0.63
1.34 1.37 1.38 1.15 0.57 0.62 0.66 0.25 0.42
2.99 4.61 4.61 0.74 0.74 0.41 0.41 0.16 0.16
100.00 100.00 100.00 64.21 100.00 65.70 61.89 64.22 38.70
PADI = 666,22 HA PALAWIJA = 666,22 HA
JUNI JULI AGUSTUS SEPTEMBER OKTOBER
II I II I II I II I II
1.34 1.37 1.38 1.15 0.57 0.62 0.66 0.25 0.42
2.99 4.61 4.61 0.74 0.74 0.41 0.41 0.16 0.16
100.00 100.00 100.00 64.21 100.00 65.70 61.89 64.22 38.70
II
DE-SEMBER
I
IINOPEMBER
I
IIOKTOBER
I
IISEPTEMBER
I
IIAGUSTUS
I
IIJULI I
IIJUNI I
IIMEI I
IIAPRIL I
IIMARE
TI
IIFEBRUARI
I
IIJAN
UARII
-1.00
0.00
1.00
2.00
3.00
4.00
5.00
0.6
1
1.0
3
0.9
6
1.1
8
1.1
5
1.1
6
0.9
2
0.4
0
0.7
0
1.0
0
1.0
7
1.3
4
1.3
7
1.3
8
1.1
5
0.5
7
0.6
2
0.6
6
0.2
5
0.4
2
0.4
1
0.4
3
0.2
1
0.0
9
-0.5
1
-0.5
1
0.6
5
0.6
5
0.8
5
0.8
5 2.2
4
2.2
4
2.7
3
2.7
3
2.9
9
2.9
9 4.6
1
4.6
1
0.7
4
0.7
4
0.4
1
0.4
1
0.1
6
0.1
6
0.0
7
0.0
7
-0.3
4
-0.3
4
GRAFIK NERACA AIR (WATER BALANCE) RENCANA POLA TANAMDAERAH IRIGASI
LUAS TANAM AREAL POTENSIAL = HA
KEBUTUHAN AIR ( m3 / dt ) DEBIT ANDALAN (m3 / dt )
DEB
IT (
m3/d
et)
MARET APRIL MEI JUNI JULI
II I II I II I II I II
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
RENCANA POLA TANAMDAERAH IRIGASI _______ HA
UNTUK AREAL POTENSIAL DENGAN SISTEM 1 GOLONGAN
NOPEMBER DESEMBERKETERANGAN
I II I II
LUAS AREAL TANAM :
GOLONGAN I : 666.22 Ha
MASA TANAM I PADI
666.22
0.37 0.44 0.23 0.19 MASA TANAM II PADI
0.44 0.41 0.19 0.00 666.62
MASA TANAM III PALAWIJA
666.62
0.40 0.43 0.21 0.09
0.27 0.28 0.14 0.06 = MASA PERTUMBUHAN
0.40 0.43 0.21 0.09 = PENGOLAHAN TANAH
= PENGERINGAN
0.48 0.51 0.25 0.11 Koefisien :
0.57 0.60 0.30 0.13 - Saluran Tersier = 1.20
0.62 0.65 0.32 0.14 - Saluran Sekunder = 1.18
- Saluran Primer = 1.08
0.41 0.43 0.21 0.09
Kebutuhan Air ( lt / dt / ha ) :
- Petak Sawah = 1.35
0.07 0.07 (0.34) (0.34) - Saluran Tersier = 1.62
- Saluran Sekunder = 1.92
18.02 17.09 (162.04) (364.57) - Saluran Primer = 2.07
PALAWIJA = 666,22 HA
NOPEMBER DESEMBER
I II I II
0.41 0.43 0.21 0.09
0.07 0.07 -0.34 -0.34
18.02 17.09 -162.04 -364.57
II
DE-SEMBER
I
IINOPEMBER
I
IIOKTOBER
I
IISEPTEMBER
I
IIAGUSTUS
I
IIJULI I
IIJUNI I
IIMEI I
IIAPRIL I
IIMARE
TI
IIFEBRUARI
I
IIJAN
UARII
-1.00
0.00
1.00
2.00
3.00
4.00
5.00
0.6
1
1.0
3
0.9
6
1.1
8
1.1
5
1.1
6
0.9
2
0.4
0
0.7
0
1.0
0
1.0
7
1.3
4
1.3
7
1.3
8
1.1
5
0.5
7
0.6
2
0.6
6
0.2
5
0.4
2
0.4
1
0.4
3
0.2
1
0.0
9
-0.5
1
-0.5
1
0.6
5
0.6
5
0.8
5
0.8
5 2.2
4
2.2
4
2.7
3
2.7
3
2.9
9
2.9
9 4.6
1
4.6
1
0.7
4
0.7
4
0.4
1
0.4
1
0.1
6
0.1
6
0.0
7
0.0
7
-0.3
4
-0.3
4
GRAFIK NERACA AIR (WATER BALANCE) RENCANA POLA TANAMDAERAH IRIGASI
LUAS TANAM AREAL POTENSIAL = HA
KEBUTUHAN AIR ( m3 / dt ) DEBIT ANDALAN (m3 / dt )
DEB
IT (
m3/d
et)
AGUSTUS SEPTEMBER
I II I II
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
GOL 1 GOL 2 GOL 3INDUK 1174.5 2,816.00 1,684.50 #REF! Potensial
LS1 223 2,816.00 1,007.00 #REF! Fungsional
LS2 686.5 #REF!
LS2A 161 #REF!
LS3 224
LS4 347LS5 210.00 LS5A 1231.5 677.5LS SUB 5A 44
LS6 199
Lebo
26.449
= MASA PERTUMBUHAN 85.795
23.408
= PENGOLAHAN TANAH 69.387
44.898
249.937
Kebondalem
93.427
24.149
46.938
51.308
215.822
Tanjungsari
59.183
18.669
77.852
Tambaksari
44.798
21.506
25.367
91.671
Tanjunganom30.938
30.938
666.220
Debit Bulanan Metoda Dr. FJ MockTahun 2008 (awal)
No. Uraian Notasi Unit Januari Feb Maret April Mei
1 2 3 4 5 6 7 8 9
Data
1 Curah Hujan P mm/bulan 200.00 222.00 420.00 420.00 25.00
2 Hari Hujan n days 11.00 15.00 11.00 10.00 7.00
Limited Evapotranspiration
3 Evapotranspiration Ep = Eto mm/bulan 132.40 117.20 131.60 118.70 120.60
4 Exposed Surface m % % 70.00 60.00 50.00 40.00 40.00
5 (d/h) x m 0.45 0.28 0.32 0.27 0.31
6 E (5) x (3) mm/mt 59.79 32.65 42.45 31.65 37.35
7 Et = Ep - E (3) - (6) mm/mt 72.61 84.55 89.15 87.05 83.25
Water Balance
8 P - Et (1) - (7) mm/mt 127.39 137.45 330.85 332.95 -58.25
9 Precipitation Flood PF x (1) mm/mt 10 11.1 21 21 1.25
10 Soil Storage (8) - (9) mm/mt 117.39 126.35 309.85 311.95 -59.50
11 Soil Moisture SMC + (10) mm/mt 217.39 226.35 309.85 311.95 -59.50
12 Water Surplus 8 mm/mt 127.39 137.45 330.85 332.95 0.00
Run Off & Groundwater Storage
13 Infiltration (12) x l mm/mt 44.59 48.11 115.80 116.53 0.00
14 0,5 x (1+k) x l mm/mt 22.29 24.05 57.90 58.27 0.00
15 mm/mt 20.00 16.92 16.39 29.71 35.19
16 Storage Volume (14) + (15) mm/mt 42.29 40.97 74.29 87.98 35.19
17 mm/mt 22.22 -1.32 33.32 13.69 -52.79
18 Base Flow (13) - (17) mm/mt 22.37 49.43 82.48 102.84 52.79
19 Direct Run Off (12) - (13) mm/mt 82.81 89.34 215.05 216.42 0.00
20 Run Off (18) + (19) mm/mt 105.18 138.77 297.54 319.26 52.79
Effective Discharge
21 Effective Discharge 5.89 8.60 16.66 18.48 2.96
Note : k = 0.4
SMC = 100 mm
CA = 150
31 28 31 30 31
Debit Bulanan Metoda Dr. FJ MockTahun 2009 (awal)
k x V (n-1)
DVn = Vn - V (n-1)
m3/det
km2
No. Uraian Notasi Unit Januari Feb Maret April Mei
1 2 3 4 5 6 7 8 9
Data
1 Curah Hujan P mm/bulan 110.00 180.00 305.00 306.00 89.00
2 Hari Hujan n days 15.00 16.00 20.00 18.00 8.00
Limited Evapotranspiration
3 Evapotranspiration Ep = Eto mm/bulan 132.40 117.20 131.60 118.70 120.60
4 Exposed Surface m % % 80.00 70.00 60.00 50.00 50.00
5 (d/h) x m 0.41 0.30 0.21 0.20 0.37
6 E (5) x (3) mm/mt 54.67 35.16 28.02 23.74 44.74
7 Et = Ep - E (3) - (6) mm/mt 77.73 82.04 103.58 94.96 75.86
Water Balance
8 P - Et (1) - (7) mm/mt 32.27 97.96 201.42 211.04 13.14
9 Precipitation Flood PF x (1) mm/mt 5.5 9 15.25 15.3 4.45
10 Soil Storage (8) - (9) mm/mt 26.77 88.96 186.17 195.74 8.69
11 Soil Moisture SMC + (10) mm/mt 126.77 188.96 186.17 195.74 8.69
12 Water Surplus 8 mm/mt 32.27 97.96 201.42 211.04 13.14
Run Off & Groundwater Storage
13 Infiltration (12) x l mm/mt 11.29 34.29 70.50 73.86 4.60
14 0,5 x (1+k) x l mm/mt 5.65 17.14 35.25 36.93 2.30
15 mm/mt 20.00 10.26 10.96 18.48 22.17
16 Storage Volume (14) + (15) mm/mt 25.65 27.40 46.21 55.42 24.47
17 mm/mt -10.59 1.75 18.81 9.21 -30.95
18 Base Flow (13) - (17) mm/mt 21.89 32.53 51.69 64.66 35.55
19 Direct Run Off (12) - (13) mm/mt 20.97 63.67 130.92 137.18 8.54
20 Run Off (18) + (19) mm/mt 42.86 96.21 182.61 201.83 44.09
Effective Discharge
21 Effective Discharge 2.40 5.97 10.23 11.68 2.47
Note : k = 0.4
SMC = 100 mm
CA = 150
31 28 31 30 31
Debit Bulanan Metoda Dr. FJ MockTahun 2010 (awal)
No. Uraian Notasi Unit Januari Feb Maret April Mei
1 2 3 4 5 6 7 8 9
k x V (n-1)
DVn = Vn - V (n-1)
m3/det
km2
Data
1 Curah Hujan P mm/bulan 295.00 397.00 78.00 333.00 75.00
2 Hari Hujan n days 15.00 21.00 12.00 10.00 11.00
Limited Evapotranspiration
3 Evapotranspiration Ep = Eto mm/bulan 132.40 117.20 131.60 118.70 120.60
4 Exposed Surface m % % 70.00 60.00 50.00 40.00 30.00
5 (d/h) x m 0.36 0.15 0.31 0.27 0.19
6 E (5) x (3) mm/mt 47.83 17.58 40.33 31.65 23.34
7 Et = Ep - E (3) - (6) mm/mt 84.57 99.62 91.27 87.05 97.26
Water Balance
8 P - Et (1) - (7) mm/mt 210.43 297.38 -13.27 245.95 -22.26
9 Precipitation Flood PF x (1) mm/mt 14.75 19.85 3.9 16.65 3.75
10 Soil Storage (8) - (9) mm/mt 195.68 277.53 -17.17 229.30 -26.01
11 Soil Moisture SMC + (10) mm/mt 295.68 377.53 -17.17 229.30 -26.01
12 Water Surplus 8 mm/mt 210.43 297.38 0.00 245.95 0.00
Run Off & Groundwater Storage
13 Infiltration (12) x l mm/mt 73.65 104.08 0.00 86.08 0.00
14 0,5 x (1+k) x l mm/mt 36.83 52.04 0.00 43.04 0.00
15 mm/mt 20.00 22.73 29.91 11.96 22.00
16 Storage Volume (14) + (15) mm/mt 56.83 74.77 29.91 55.01 22.00
17 mm/mt 49.97 17.95 -44.86 25.10 -33.00
18 Base Flow (13) - (17) mm/mt 23.68 86.14 44.86 60.99 33.00
19 Direct Run Off (12) - (13) mm/mt 136.78 193.30 0.00 159.87 0.00
20 Run Off (18) + (19) mm/mt 160.47 279.43 44.86 220.86 33.00
Effective Discharge
21 Effective Discharge 8.99 17.33 2.51 12.78 1.85
Note : k = 0.4
SMC = 100 mm
CA = 150
31 28 31 30 31
Debit Bulanan Metoda Dr. FJ MockTahun 2011 (awal)
No. Uraian Notasi Unit Januari Feb Maret April Mei
1 2 3 4 5 6 7 8 9
Data
1 Curah Hujan P mm/bulan 425.00 340.00 256.00 256.00 194.00
2 Hari Hujan n days 12.00 16.00 17.00 11.00 7.00
Limited Evapotranspiration
3 Evapotranspiration Ep = Eto mm/bulan 132.40 117.20 131.60 118.70 120.60
k x V (n-1)
DVn = Vn - V (n-1)
m3/det
km2
4 Exposed Surface m % % 40.00 30.00 30.00 30.00 30.00
5 (d/h) x m 0.25 0.13 0.14 0.19 0.23
6 E (5) x (3) mm/mt 32.46 15.07 17.83 22.55 28.01
7 Et = Ep - E (3) - (6) mm/mt 99.94 102.13 113.77 96.15 92.59
Water Balance
8 P - Et (1) - (7) mm/mt 325.06 237.87 142.23 159.85 101.41
9 Precipitation Flood PF x (1) mm/mt 21.25 17 12.8 12.8 9.7
10 Soil Storage (8) - (9) mm/mt 303.81 220.87 129.43 147.05 91.71
11 Soil Moisture SMC + (10) mm/mt 403.81 320.87 129.43 147.05 91.71
12 Water Surplus 8 mm/mt 325.06 237.87 142.23 159.85 101.41
Run Off & Groundwater Storage
13 Infiltration (12) x l mm/mt 113.77 83.25 49.78 55.95 35.49
14 0,5 x (1+k) x l mm/mt 56.89 41.63 24.89 27.97 17.75
15 mm/mt 20.00 30.75 28.95 21.54 19.80
16 Storage Volume (14) + (15) mm/mt 76.89 72.38 53.84 49.51 37.55
17 mm/mt 40.32 -4.50 -18.54 -4.33 -11.96
18 Base Flow (13) - (17) mm/mt 73.45 87.76 68.32 60.28 47.45
19 Direct Run Off (12) - (13) mm/mt 211.29 154.61 92.45 103.90 65.92
20 Run Off (18) + (19) mm/mt 284.74 242.37 160.77 164.18 113.37
Effective Discharge
21 Effective Discharge 15.95 15.03 9.00 9.50 6.35
Note : k = 0.4
SMC = 100 mm
CA = 150
31 28 31 30 31
Debit Bulanan Metoda Dr. FJ MockTahun 2012 (awal)
No. Uraian Notasi Unit Januari Feb Maret April Mei
1 2 3 4 5 6 7 8 9
Data
1 Curah Hujan P mm/bulan 318.00 136.00 406.00 255.00 66.00
2 Hari Hujan n days 10.00 15.00 16.00 19.00 16.00
Limited Evapotranspiration
3 Evapotranspiration Ep = Eto mm/bulan 132.40 117.20 131.60 118.70 120.60
4 Exposed Surface m % % 50.00 40.00 30.00 30.00 30.00
5 (d/h) x m 0.34 0.19 0.15 0.11 0.15
6 E (5) x (3) mm/mt 44.85 21.77 19.10 13.06 17.51
7 Et = Ep - E (3) - (6) mm/mt 87.55 95.43 112.50 105.64 103.09
Water Balance
k x V (n-1)
DVn = Vn - V (n-1)
m3/det
km2
8 P - Et (1) - (7) mm/mt 230.45 40.57 293.50 149.36 -37.09
9 Precipitation Flood PF x (1) mm/mt 15.9 6.8 20.3 12.75 3.3
10 Soil Storage (8) - (9) mm/mt 214.55 33.77 273.20 136.61 -40.39
11 Soil Moisture SMC + (10) mm/mt 314.55 133.77 273.20 136.61 -40.39
12 Water Surplus 8 mm/mt 230.45 40.57 293.50 149.36 0.00
Run Off & Groundwater Storage
13 Infiltration (12) x l mm/mt 80.66 14.20 102.73 52.27 0.00
14 0,5 x (1+k) x l mm/mt 40.33 7.10 51.36 26.14 0.00
15 mm/mt 20.00 24.13 12.49 25.54 20.67
16 Storage Volume (14) + (15) mm/mt 60.33 31.23 63.86 51.68 20.67
17 mm/mt 41.36 -29.10 32.62 -12.18 -31.01
18 Base Flow (13) - (17) mm/mt 39.29 43.30 70.10 64.45 31.01
19 Direct Run Off (12) - (13) mm/mt 149.79 26.37 190.78 97.08 0.00
20 Run Off (18) + (19) mm/mt 189.08 69.66 260.88 161.53 31.01
Effective Discharge
21 Effective Discharge 10.59 4.32 14.61 9.35 1.74
Note : k = 0.4
SMC = 100 mm
CA = 150
31 28 31 30 31
k x V (n-1)
DVn = Vn - V (n-1)
m3/det
km2
Debit Bulanan Metoda Dr. FJ MockTahun 2008 (awal)
Juni Juli Ags Sept Okt Nov Des
10 11 12 13 14 15 16 17 18
24.00 0.00 0.00 56.00 0.00 125.00 152.00
4.00 0.00 3.00 2.00 0.00 4.00 15.00
117.80 120.30 125.40 112.80 120.80 123.40 133.70
50.00 60.00 70.00 80.00 90.00 90.00 80.00
0.43 0.60 0.63 0.75 0.90 0.78 0.41
51.05 72.18 79.29 84.22 108.72 96.25 55.21
66.75 48.12 46.11 28.58 12.08 27.15 78.49
-42.75 -48.12 -46.11 27.42 -12.08 97.85 73.51
1.2 0 0 2.8 0 6.25 7.6
-43.95 -48.12 -46.11 24.62 -12.08 91.60 65.91
-43.95 -48.12 -46.11 24.62 -12.08 91.60 65.91
0.00 0.00 0.00 27.42 0.00 97.85 73.51
0.00 0.00 0.00 9.60 0.00 34.25 25.73
0.00 0.00 0.00 4.80 0.00 17.12 12.86
14.08 5.63 2.25 0.90 2.28 0.91 7.21
14.08 5.63 2.25 5.70 2.28 18.04 20.08
-21.12 -8.45 -3.38 3.45 -3.42 15.76 2.04
21.12 8.45 3.38 6.15 3.42 18.49 23.69
0.00 0.00 0.00 17.83 0.00 63.60 47.78
21.12 8.45 3.38 23.98 3.42 82.10 71.46
1.22 0.47 0.19 1.39 0.19 4.75 4.00
I = 0.35
IS = 50 mm
PF = 0.05
30 31 31 30 31 30 31
Debit Bulanan Metoda Dr. FJ MockTahun 2009 (awal)
Juni Juli Ags Sept Okt Nov Des
10 11 12 13 14 15 16 17 18
0.00 64.00 23.00 0.00 205.00 150.00 190.00
7.00 1.00 0.00 0.00 1.00 5.00 10.00
117.80 120.30 125.40 112.80 120.80 123.40 133.70
50.00 60.00 70.00 80.00 90.00 90.00 80.00
0.38 0.58 0.70 0.80 0.87 0.75 0.54
45.16 69.85 87.78 90.24 105.21 92.55 72.46
72.64 50.45 37.62 22.56 15.59 30.85 61.24
-72.64 13.55 -14.62 -22.56 189.41 119.15 128.76
0 3.2 1.15 0 10.25 7.5 9.5
-72.64 10.35 -15.77 -22.56 179.16 111.65 119.26
-72.64 10.35 -15.77 -22.56 179.16 111.65 119.26
0.00 13.55 0.00 0.00 189.41 119.15 128.76
0.00 4.74 0.00 0.00 66.29 41.70 45.06
0.00 2.37 0.00 0.00 33.15 20.85 22.53
9.79 3.91 2.51 1.01 0.40 13.42 13.71
9.79 6.29 2.51 1.01 33.55 34.27 36.24
-14.68 -3.50 -3.77 -1.51 32.54 0.72 1.97
14.68 8.24 3.77 1.51 33.75 40.98 43.10
0.00 8.81 0.00 0.00 123.12 77.45 83.69
14.68 17.05 3.77 1.51 156.87 118.43 126.79
0.85 0.95 0.21 0.09 8.79 6.85 7.10
I = 0.35
IS = 50 mm
PF = 0.05
30 31 31 30 31 30 31
Debit Bulanan Metoda Dr. FJ MockTahun 2010 (awal)
Juni Juli Ags Sept Okt Nov Des
10 11 12 13 14 15 16 17 18
0.00 32.00 17.00 0.00 23.00 112.00 122.00
7.00 3.00 2.00 0.00 3.00 9.00 15.00
117.80 120.30 125.40 112.80 120.80 123.40 133.70
30.00 40.00 50.00 60.00 70.00 60.00 50.00
0.23 0.36 0.47 0.60 0.63 0.42 0.26
27.09 43.46 58.65 67.68 76.38 51.83 34.50
90.71 76.84 66.75 45.12 44.42 71.57 99.20
-90.71 -44.84 -49.75 -45.12 -21.42 40.43 22.80
0 1.6 0.85 0 1.15 5.6 6.1
-90.71 -46.44 -50.60 -45.12 -22.57 34.83 16.70
-90.71 -46.44 -50.60 -45.12 -22.57 34.83 16.70
0.00 0.00 0.00 0.00 0.00 40.43 22.80
0.00 0.00 0.00 0.00 0.00 14.15 7.98
0.00 0.00 0.00 0.00 0.00 7.07 3.99
8.80 3.52 1.41 0.56 0.23 0.09 2.87
8.80 3.52 1.41 0.56 0.23 7.17 6.86
-13.20 -5.28 -2.11 -0.84 -0.34 6.94 -0.31
13.20 5.28 2.11 0.84 0.34 7.21 8.29
0.00 0.00 0.00 0.00 0.00 26.28 14.82
13.20 5.28 2.11 0.84 0.34 33.49 23.11
0.76 0.30 0.12 0.05 0.02 1.94 1.29
I = 0.35
IS = 50 mm
PF = 0.05
30 31 31 30 31 30 31
Debit Bulanan Metoda Dr. FJ MockTahun 2011 (awal)
Juni Juli Ags Sept Okt Nov Des
10 11 12 13 14 15 16 17 18
0.00 0.00 0.00 102.00 19.00 58.00 284.00
5.00 1.00 0.00 0.00 2.00 7.00 10.00
117.80 120.30 125.40 112.80 120.80 123.40 133.70
30.00 40.00 50.00 60.00 70.00 70.00 60.00
0.25 0.39 0.50 0.60 0.65 0.54 0.41
29.45 46.57 62.70 67.68 79.10 66.22 54.34
88.35 73.73 62.70 45.12 41.70 57.18 79.36
-88.35 -73.73 -62.70 56.88 -22.70 0.82 204.64
0 0 0 5.1 0.95 2.9 14.2
-88.35 -73.73 -62.70 51.78 -23.65 -2.08 190.44
-88.35 -73.73 -62.70 51.78 -23.65 -2.08 190.44
0.00 0.00 0.00 56.88 0.00 0.82 204.64
0.00 0.00 0.00 19.91 0.00 0.29 71.62
0.00 0.00 0.00 9.95 0.00 0.14 35.81
15.02 6.01 2.40 0.96 4.37 1.75 0.76
15.02 6.01 2.40 10.92 4.37 1.89 36.57
-22.53 -9.01 -3.60 8.51 -6.55 -2.48 34.68
22.53 9.01 3.60 11.40 6.55 2.76 36.95
0.00 0.00 0.00 36.97 0.00 0.54 133.02
22.53 9.01 3.60 48.37 6.55 3.30 169.96
1.30 0.50 0.20 2.80 0.37 0.19 9.52
I = 0.35
IS = 50 mm
PF = 0.05
30 31 31 30 31 30 31
Debit Bulanan Metoda Dr. FJ MockTahun 2012 (awal)
Juni Juli Ags Sept Okt Nov Des
10 11 12 13 14 15 16 17 18
102.00 0.00 19.00 250.00 17.00 280.00 25.00
3.00 2.00 1.00 0.00 0.00 6.00 9.00
117.80 120.30 125.40 112.80 120.80 123.40 133.70
40.00 50.00 60.00 70.00 80.00 80.00 70.00
0.36 0.47 0.58 0.70 0.80 0.64 0.50
42.41 56.27 72.81 78.96 96.64 78.98 66.42
75.39 64.03 52.59 33.84 24.16 44.42 67.28
26.61 -64.03 -33.59 216.16 -7.16 235.58 -42.28
5.1 0 0.95 12.5 0.85 14 1.25
21.51 -64.03 -34.54 203.66 -8.01 221.58 -43.53
21.51 -64.03 -34.54 203.66 -8.01 221.58 -43.53
26.61 0.00 0.00 216.16 0.00 235.58 0.00
9.31 0.00 0.00 75.66 0.00 82.45 0.00
4.66 0.00 0.00 37.83 0.00 41.23 0.00
8.27 5.17 2.07 0.83 15.46 6.18 18.96
12.93 5.17 2.07 38.66 15.46 47.41 18.96
-7.75 -7.76 -3.10 36.59 -23.19 31.95 -28.45
17.06 7.76 3.10 39.07 23.19 50.50 28.45
17.30 0.00 0.00 140.50 0.00 153.12 0.00
34.35 7.76 3.10 179.57 23.19 203.63 28.45
1.99 0.43 0.17 10.39 1.30 11.78 1.59
I = 0.35
IS = 50 mm
PF = 0.05
30 31 31 30 31 30 31
Debit Bulanan Metoda Dr. FJ MockTahun 2008 (awal)
19 20 21 22 23 24 25 26 27
Debit Bulanan Metoda Dr. FJ MockTahun 2009 (awal)
19 20 21 22 23 24 25 26 27
Debit Bulanan Metoda Dr. FJ MockTahun 2010 (awal)
19 20 21 22 23 24 25 26 27
Debit Bulanan Metoda Dr. FJ MockTahun 2011 (awal)
19 20 21 22 23 24 25 26 27
Debit Bulanan Metoda Dr. FJ MockTahun 2012 (awal)
19 20 21 22 23 24 25 26 27
Debit Bulanan Metoda Dr. FJ MockTahun 2008 (awal)
28
Debit Bulanan Metoda Dr. FJ MockTahun 2009 (awal)
28
Debit Bulanan Metoda Dr. FJ MockTahun 2010 (awal)
28
Debit Bulanan Metoda Dr. FJ MockTahun 2011 (awal)
28
Debit Bulanan Metoda Dr. FJ MockTahun 2012 (awal)
28
DEBIT BULANAN METODA MOCK
BulanJan Feb Mar Apr Mei Jun Jul
Tahun2008 5.89 8.60 16.66 18.48 2.96 1.22 0.472009 2.40 5.97 10.23 11.68 2.47 0.85 0.952010 8.99 17.33 2.51 12.78 1.85 0.76 0.302011 15.95 15.03 9.00 9.50 6.35 1.30 0.502012 10.59 4.32 14.61 9.35 1.74 1.99 0.43Rata2 8.76 10.25 10.60 12.36 3.07 1.23 0.53
Sd 5.09 5.68 5.50 3.72 1.90 0.49 0.25Q80 rumus 4.47 5.46 5.97 9.23 1.47 0.82 0.32
Q80 real
DesNovOktSepAgsJulJunMeiAprMarFebJan
-2.000.002.004.006.008.00
10.00
DEBIT ANDALAN MOCK
Q80 (rumus)
BULAN
DEBIT
DEBIT BULANAN METODA MOCK
Ags Sep Okt Nov Des
0.19 1.39 0.19 4.75 4.000.21 0.09 8.79 6.85 7.100.12 0.05 0.02 1.94 1.290.20 2.80 0.37 0.19 9.520.17 10.39 1.30 11.78 1.590.18 2.94 2.13 5.10 4.700.04 4.31 3.75 4.53 3.560.15 -0.69 -1.03 1.29 1.70
DesNovOktSepAgsJulJunMeiAprMarFebJan
-2.000.002.004.006.008.00
10.00
DEBIT ANDALAN MOCK
Q80 (rumus)
BULAN
DEBIT
Berdasarkan Perhitungan Debit Metode Dr. FJ. Mock
ProbabilitasJan Feb Maret April Mei Juni Juli
1 2 1 2 1
1 16.67 5.89 8.60 16.66 18.48 2.96 1.22 0.472 33.33 2.40 5.97 10.23 11.68 2.47 0.85 0.953 50.00 8.99 17.33 2.51 12.78 1.85 0.76 0.304 66.67 15.95 15.03 9.00 9.50 6.35 1.30 0.505 83.33 10.59 4.32 14.61 9.35 1.74 1.99 0.43
8.763 10.249 10.603 12.357 3.072 1.225 0.533
Sd 5.092 5.682 5.499 3.718 1.897 0.485 0.249
4.47 5.46 5.97 9.23 1.47 0.82 0.32
10.59 5.96 11.24 11.87 8.80 11.09 13.23
Rata2
Q80 (rumus)
Q80 (real)
Berdasarkan Perhitungan Debit Metode Dr. FJ. Mock
Agustus Sept Oktober Nov Des
2 1 2 1 2
0.19 1.39 0.19 4.75 4.000.21 0.09 8.79 6.85 7.100.12 0.05 0.02 1.94 1.290.20 2.80 0.37 0.19 9.520.17 10.39 1.30 11.78 1.59
0.179 2.943 2.132 5.103 4.702
0.037 4.314 3.752 4.527 3.561
0.15 -0.69 -1.03 1.29 1.70
9.05 0.00 0.00 3.07 2.25
Debit Andalan Metode Basic Month
Berdasarkan Perhitungan Debit Metode Dr. FJ. MockBasic Month