Attachment

91
NIM GENAP Bulan Jan Feb Maret April Mei Juni Juli Eo 5.55 5.67 5.6 5.35 4.28 5.32 5.3 Pekolasi 2 2 2 2 2 2 2 Eo+P 7.55 7.67 7.6 7.35 6.28 7.52 7.3 Rh (fin5dry 5.02 4.57 5.6 4.67 0.8 0 0 Soal : 1. Hitung kebutuhan air untuk padi unggul dengan 2 golongan 2. Hitung ketersediaan air di sumbernya 3. Gambar grafik waterbalance Data untuk simulasi Mock GENAP i 0.35 k 0.4 CA 150 km2 Is 50 mm smc 100 mm Data Hujan (GENAP) Th.2008 P 200 222 420 420 25 24 0 n 11 15 11 10 7 4 0 Eto 132.4 117.2 131.6 118.7 120.6 117.8 120.3 m 70 60 50 40 40 50 60 Th.2009 P 110 180 305 306 89 0 64 n 15 16 20 18 8 7 1 Eto 132.4 117.2 131.6 118.7 120.6 117.8 120.3 m 80 70 60 50 50 50 60 Th.2010 P 295 397 78 333 75 0 32 n 15 21 12 10 11 7 3 Eto 132.4 117.2 131.6 118.7 120.6 117.8 120.3 m 70 60 50 40 30 30 40 Th.2011 P 425 340 256 256 194 0 0 n 12 16 17 11 7 5 1 Eto 132.4 117.2 131.6 118.7 120.6 117.8 120.3 m 40 30 30 30 30 30 40 Th.2012 P 318 136 406 255 66 102 0 n 10 15 16 19 16 3 2 Eto 132.4 117.2 131.6 118.7 120.6 117.8 120.3

description

atat

Transcript of Attachment

Page 1: Attachment

NIM GENAPBulan Jan Feb Maret April Mei Juni Juli AgustusEo 5.55 5.67 5.6 5.35 4.28 5.32 5.3 5.45Pekolasi 2 2 2 2 2 2 2 2Eo+P 7.55 7.67 7.6 7.35 6.28 7.52 7.3 7.45Rh (fin5dry) 5.02 4.57 5.6 4.67 0.8 0 0 0.05

Soal :1. Hitung kebutuhan air untuk padi unggul dengan 2 golongan2. Hitung ketersediaan air di sumbernya3. Gambar grafik waterbalance

Data untuk simulasi MockGENAPi 0.35k 0.4CA 150 km2Is 50 mmsmc 100 mm

Data Hujan (GENAP)Th.2008P 200 222 420 420 25 24 0 0n 11 15 11 10 7 4 0 3Eto 132.4 117.2 131.6 118.7 120.6 117.8 120.3 125.4m 70 60 50 40 40 50 60 70Th.2009P 110 180 305 306 89 0 64 23n 15 16 20 18 8 7 1 0Eto 132.4 117.2 131.6 118.7 120.6 117.8 120.3 125.4m 80 70 60 50 50 50 60 70Th.2010P 295 397 78 333 75 0 32 17n 15 21 12 10 11 7 3 2Eto 132.4 117.2 131.6 118.7 120.6 117.8 120.3 125.4m 70 60 50 40 30 30 40 50Th.2011P 425 340 256 256 194 0 0 0n 12 16 17 11 7 5 1 0Eto 132.4 117.2 131.6 118.7 120.6 117.8 120.3 125.4m 40 30 30 30 30 30 40 50Th.2012P 318 136 406 255 66 102 0 19n 10 15 16 19 16 3 2 1Eto 132.4 117.2 131.6 118.7 120.6 117.8 120.3 125.4m 50 40 30 30 30 40 50 60

Page 2: Attachment

Sept Oktober Nov Des5.23 5.3 5.53 4.97

2 2 2 27.23 7.3 7.53 6.970.07 0.02 0.8 2.56

56 0 125 1522 0 4 15

112.8 120.8 123.4 133.780 90 90 80

0 205 150 1900 1 5 10

112.8 120.8 123.4 133.780 90 90 80

0 23 112 1220 3 9 15

112.8 120.8 123.4 133.760 70 60 50

102 19 58 2840 2 7 10

112.8 120.8 123.4 133.760 70 70 60

250 17 280 250 0 6 9

112.8 120.8 123.4 133.770 80 80 70

Page 3: Attachment

Lampiran 4 -1.

TABEL ZYLSTRAKEBUTUHAN PENJENUHAN PENDAHULUAN (AIR IRIGASI)

SELAMA PENYIAPAN LAHAN UNTUK PADI

Jumlah Penjenuhan 200 mm

T Penguapan dan Perembesan (Eo + P) mm/hari

Hari 3.5 3.6 3.7 3.8 3.9 4.0 4.1 4.2 4.3 4.4 4.5

30 8.6 8.6 8.7 8.8 8.8 8.9 8.9 9.0 9.1 9.1 9.2

35 7.6 7.7 7.8 7.8 7.9 7.9 8.0 8.1 8.1 8.2 8.3

40 7.0 7.0 7.0 7.1 7.2 7.3 7.3 7.4 7.5 7.5 7.6

45 6.4 6.5 6.6 6.6 6.7 6.7 6.5 6.9 6.9 7.0 7.1

50 6.0 6.1 6.1 6.2 6.3 6.3 6.4 6.5 6.5 6.5 6.7

55 5.7 5.7 5.8 5.5 5.9 6.0 6.1 6.0 6.2 6.3 6.3

60 5.4 5.5 5.5 5.6 5.7 5.7 5.8 5.9 5.9 6.0 6.1

T Penguapan dan Perembesan (Eo + P) mm/hari

Hari 6.0 6.1 6.2 6.3 6.4 6.5 6.6 6.7 6.8 6.9 7.0

30 10.1 10.2 10.2 10.2 10.4 10.4 10.5 10.6 10.6 10.7 10.8

35 9.2 9.3 9.4 9.4 9.5 9.6 9.6 9.7 9.8 9.8 9.9

40 8.6 8.7 8.7 8.7 8.8 8.9 9.0 9.1 9.1 9.2 9.3

45 8.1 8.2 8.2 8.2 9.4 8.5 8.5 8.6 8.7 8.8 8.8

50 7.7 7.8 7.9 7.9 8.0 8.1 8.2 8.2 8.3 8.4 8.5

55 7.4 7.5 7.6 7.6 7.7 7.8 7.9 8.0 8.1 8.1 8.2

60 7.2 7.3 7.3 7.3 7.5 7.6 7.7 7.7 7.8 7.9 8.0

Data : PSA - 010, Dirjen Pengairan, Bina Program (1985)

(Tab padCaatan : Sheet perhitungan Kebutuhan PenjenuhanEo+P 7.55 7.67 7.60 7.35 6.28 7.32 7.30 7.45 7.23 7.30 7.53 6.97

Page 4: Attachment

Pejenuh 11.10 10.40 11.10 10.95 10.20 10.92 10.90 11.05 10.90 10.90 11.10 10.77

0.01 0.10 0.1 0.01 0.01

0.07 0.07

Page 5: Attachment

Lampiran 4 -1.

TABEL ZYLSTRAKEBUTUHAN PENJENUHAN PENDAHULUAN (AIR IRIGASI)

SELAMA PENYIAPAN LAHAN UNTUK PADI

Penguapan dan Perembesan (Eo + P) mm/hari

4.6 4.7 4.8 4.9 5.0 5.1 5.2 5.3 5.4 5.5 5.6 5.7 5.8

9.2 9.3 9.4 9.4 9.5 9.6 9.6 9.7 9.7 9.8 9.9 9.9 10.0

8.3 8.4 8.4 8.5 8.6 8.6 9.7 8.8 8.8 8.9 9.0 9.0 9.1

7.6 7.7 7.8 7.3 7.9 8.0 8.0 8.1 8.2 8.1 8.3 8.3 8.4

7.1 7.2 7.3 7.3 7.4 7.4 7.5 7.6 7.7 7.9 7.3 7.9 8.0

6.7 6.8 6.9 6.9 7.0 7.1 7.1 7.2 7.5 7.5 7.4 7.5 7.6

6.4 6.5 6.6 6.6 6.7 6.8 6.9 6.9 7.0 7.1 7.1 7.2 7.5

6.1 6.2 6.3 6.4 6.4 6.5 6.6 6.7 6.7 6.9 6.9 7.0 7.0

Penguapan dan Perembesan (Eo + P) mm/hari

7.1 7.2 7.3 7.4 7.5 7.6 7.7 7.8 7.9 8.0 8.1 8.2 8.3

10.8 10.9 10.9 11.0 11.1 11.1 11.2 11.3 11.3 11.4 11.5 11.5 11.6

9.9 10.0 10.1 10.1 10.2 10.3 10.4 10.4 10.5 10.6 10.6 10.7 10.8

9.3 9.4 9.5 9.5 9.6 9.7 9.8 9.5 9.9 10.0 10.0 10.1 10.2

8.9 8.9 9.0 9.1 9.2 9.2 9.3 9.4 9.5 9.5 9.6 9.7 9.8

8.5 8.6 8.7 8.7 8.8 8.9 9.0 9.0 9.1 9.2 9.3 9.4 9.4

8.2 8.2 8.4 8.5 8.5 8.6 8.7 8.7 8.9 8.9 9.0 9.1 9.2

8.0 8.1 8.2 8.3 8.3 8.4 8.5 8.6 8.7 8.7 8.8 8.9 9.0

Page 6: Attachment

Lampiran 4 -1.

TABEL ZYLSTRAKEBUTUHAN PENJENUHAN PENDAHULUAN (AIR IRIGASI)

SELAMA PENYIAPAN LAHAN UNTUK PADI

Penguapan dan Perembesan (Eo + P) mm/hari

5.9

10.0

9.2

8.5

8.0

7.7

7.4

7.1

Penguapan dan Perembesan (Eo + P) mm/hari

8.4 8.5 8.6 8.7 8.8 8.9 9.0

11.7 11.7 11.8 11.9 12.0 12.0 12.1

10.9 10.4 11.0 11.1 11.2 11.2 11.3

10.3 10.3 10.4 10.5 10.6 10.7 10.7

9.8 9.9 10.0 10.1 10.2 10.2 10.3

9.5 9.6 9.7 9.8 9.8 9.9 10.0

9.3 9.4 9.4 9.5 9.6 9.7 9.8

9.1 9.3 9.3 9.3 9.4 9.5 9.6

Page 7: Attachment

PERHITUNGAN CURAH HUJAN BULANAN RATA-RATA

STASIUN : KARANGDOWO

NO. STA. : 97

TAHUNB U L A N

JAN PEB MAR APR MEI JUN

2008 200 222 420 420 25 24

2009 110 180 305 306 89 0

2010 295 397 78 333 75 0

2011 425 340 256 256 194 0

2012 318 136 406 255 66 102

x 269.60 255.00 293.00 314.00 89.80 25.20

SD 119.85 109.85 138.42 68.02 62.93 44.17

R80% bulanan168.69 162.51 176.45 256.73 36.81 0.00

R80% harian 5.44 5.80 5.69 8.56 1.19 0.00

Catatan : x = Curah Hujan Bulanan Rata - Rata ( mm )

SD = Standar Deviasi =

R80% bulan = Curah Hujan Efektif 20 % Kering Bulanan ( mm )

_

= x + K . SD ; K = - 0,842

R80% haria = Curah Hujan Efektif 20 % Kering Harian ( mm )

= R5 bulanan / m m = Jumlah Hari Dalam Satu Bulan

√ X2−(∑ X )2 /nn−1

Page 8: Attachment

PERHITUNGAN CURAH HUJAN BULANAN RATA-RATA

STASIUN : KARANGDOWO

NO. STA. : 97

B U L A N

JUL AGU SEP OKT NOP DES

0 0 56 0 125 152

64 23 0 205 150 190

32 17 0 23 112 122

0 0 102 19 58 284

0 19 250 17 280 25

19.20 11.80 81.60 52.80 145.00 154.60

28.62 10.99 103.38 85.53 82.63 94.69

0.00 2.55 0.00 0.00 75.43 74.87

0.00 0.08 0.00 0.00 2.51 2.42

Curah Hujan Bulanan Rata - Rata ( mm )

; n = Jumlah Data

Curah Hujan Efektif 20 % Kering Bulanan ( mm )

Curah Hujan Efektif 20 % Kering Harian ( mm )

m = Jumlah Hari Dalam Satu Bulan

√ X2−(∑ X )2 /nn−1

Page 9: Attachment

KEBUTUHAN AIR IRIGASI UNTUK PADI PENDEKDENGAN SISTEM 1 GOLONGAN

DAERAH IRIGASI COLO BARAT (BENDUNG COLO)

B U L A N JAN Eto (dari penman) ( mm / hari ) 5.05

Eo = 1.1 X Eto ( mm / hari ) 5.55

P ( mm / hari ) 2.00

Eo + P ( mm / hari ) 7.55

Rh = HUJAN ( 20 % KERING ) ( mm / hari ) 5.02

FACTOR 1 0.16 0.80

HUJAN 2 0.53 4.00

DENGAN 3 0.35 1.76

1 GOLONGAN 4 0.4 Re = Fh X Rh 2.01

TIAP 2 5 0.4 ( mm / hari ) 2.01

MINGGU 6 0.4 2.01

( Fh ) 7 0.4 2.01

8 0.2 1.00

1 1.20 6.05

KOEFISIEN 2 1.27 6.41

TANAMAN 3 1.33 Etc = Kc X Eto 6.71

( Kc ) 4 1.30 ( mm / hari ) 6.56

5 1.15 5.80

6 0.00 0.00

PENGOLAHAN TANAH LP 11.10

2 MINGGU KE 1 LP-Re.1 A 10.30

A X 0,116 B 1.19

PENGOLAHAN TANAH LP 11.10

2 MINGGU KE 2 LP-Re.2 A 7.10

A x 0.116 B 0.82

KEBUTUHAN AIR ETc.1-Re.3+P+ A 9.63

2 MINGGU KE 1 A x 0.116 B 1.12

W = 3.33 (mm / hari)

KEBUTUHAN AIR ETc.2-Re.4+P+ A 9.73

2 MINGGU KE 2 A x 0.116 B 1.13

W = 3.33 (mm / hari)

KEBUTUHAN AIR ETc.3-Re.5+P+ A 10.03

2 MINGGU KE 3 A x 0.116 B 1.16

W = 3.33 (mm / hari)

Page 10: Attachment

KEBUTUHAN AIR ETc.4-Re.6+P+ A 9.88

2 MINGGU KE 4 A x 0.116 B 1.15

W = 3.33 (mm / hari)

KEBUTUHAN AIR ETc.5-Re.7+P A 5.79

2 MINGGU KE 5 A x 0.116 B 0.67

W = 3.33 (mm / hari)

KEBUTUHAN AIR ETc.6-Re.8+P A 1.00

2 MINGGU KE 6 A x 0.116 B 0.12

W = 3.33 (mm / hari)

Catatan :

A = kebutuhan air (mm/hari)

B = Kebutuhan air (lt/dt/ha)

Page 11: Attachment

KEBUTUHAN AIR IRIGASI UNTUK PADI PENDEKDENGAN SISTEM 1 GOLONGAN

DAERAH IRIGASI COLO BARAT (BENDUNG COLO)

PEB MAR APR MEI JUN JUL AGU SEP5.15 5.09 4.86 3.89 4.84 4.82 4.95 4.75

5.67 5.60 5.35 4.28 5.32 5.30 5.45 5.23

2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00

7.67 7.60 7.35 6.28 7.32 7.30 7.45 7.23

4.57 5.60 4.67 0.80 0.00 0.00 0.05 0.07

0.73 0.90 0.75 0.13 0.00 0.00 0.01 0.01

4.07 4.03 3.90 3.33 3.88 3.87 3.95 3.83

1.60 1.96 1.63 0.28 0.00 0.00 0.02 0.02

1.83 2.24 1.87 0.32 0.00 0.00 0.02 0.03

1.83 2.24 1.87 0.32 0.00 0.00 0.02 0.03

1.83 2.24 1.87 0.32 0.00 0.00 0.02 0.03

1.83 2.24 1.87 0.32 0.00 0.00 0.02 0.03

0.91 1.12 0.93 0.16 0.00 0.00 0.01 0.01

6.19 6.11 5.84 4.67 5.80 5.78 5.95 5.71

6.55 6.47 6.18 4.94 6.14 6.12 6.29 6.04

6.86 6.77 6.47 5.17 6.43 6.41 6.59 6.32

6.70 6.62 6.32 5.06 6.29 6.26 6.44 6.18

5.93 5.85 5.59 4.47 5.56 5.54 5.70 5.47

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

10.40 11.10 10.95 10.20 10.92 10.90 11.05 10.90

9.67 10.20 10.20 10.07 10.92 10.90 11.04 10.89

1.12 1.18 1.18 1.17 1.27 1.26 1.28 1.26

10.40 11.10 10.95 10.20 10.92 10.90 11.05 10.90

6.33 7.07 7.05 6.87 7.04 7.03 7.10 7.07

0.73 0.82 0.82 0.80 0.82 0.82 0.82 0.82

9.92 9.48 9.53 9.72 11.13 11.11 11.26 11.01

1.15 1.10 1.11 1.13 1.29 1.29 1.31 1.28

10.05 9.56 9.64 9.95 11.47 11.45 11.60 11.34

1.17 1.11 1.12 1.15 1.33 1.33 1.35 1.32

10.36 9.86 9.93 10.18 11.76 11.74 11.90 11.63

1.20 1.14 1.15 1.18 1.36 1.36 1.38 1.35

Page 12: Attachment

10.20 9.71 9.78 10.07 11.62 11.59 11.75 11.48

1.18 1.13 1.14 1.17 1.35 1.34 1.36 1.33

6.10 5.61 5.73 6.15 7.56 7.54 7.68 7.44

0.71 0.65 0.66 0.71 0.88 0.87 0.89 0.86

1.09 0.88 1.07 1.84 2.00 2.00 1.99 1.99

0.13 0.10 0.12 0.21 0.23 0.23 0.23 0.23

Page 13: Attachment

KEBUTUHAN AIR IRIGASI UNTUK PADI PENDEKDENGAN SISTEM 1 GOLONGAN

DAERAH IRIGASI COLO BARAT (BENDUNG COLO)

OKT NOP DES4.82 5.03 4.52

5.30 5.53 4.97

2.00 2.00 2.00

7.30 7.53 6.97

0.02 0.80 2.56

0.00 0.13 0.41

3.87 3.99 3.69

0.01 0.28 0.90

0.01 0.32 1.02

0.01 0.32 1.02

0.01 0.32 1.02

0.01 0.32 1.02

0.00 0.16 0.51

5.78 6.03 5.42

6.12 6.38 5.74

6.41 6.69 6.01

6.26 6.54 5.87

5.54 5.78 5.20

0.00 0.00 0.00

10.90 11.10 10.77

10.90 10.97 10.36

1.26 1.27 1.20

10.90 11.10 10.77

7.03 7.11 7.08

0.82 0.82 0.82

11.10 11.08 9.86

1.29 1.29 1.14

11.44 11.39 10.04

1.33 1.32 1.17

11.73 11.70 10.32

1.36 1.36 1.20

Page 14: Attachment

11.59 11.55 10.18

1.34 1.34 1.18

7.53 7.46 6.17

0.87 0.87 0.72

2.00 1.84 1.49

0.23 0.21 0.17

Page 15: Attachment

Lampiran 5.4a.KEBUTUHAN AIR SELAMA PENGOLAHAN TANAH UNTUK PALAWIJA

B U L A N JAN PEB MAR APR MEI

Eto (dari penman) 5.05 5.15 5.09 4.86 3.89

Eo 5.55 5.67 5.60 5.35 4.28

M = Eo + P 7.55 7.67 7.60 7.35 6.28

k = MT / S 2.27 2.30 2.28 2.21 1.88

9.63 9.98 9.78 9.07 6.58

8.42 8.52 8.47 8.26 7.41

ek

IR = M ek/ (ek - 1)

Page 16: Attachment

Lampiran 5.4a.KEBUTUHAN AIR SELAMA PENGOLAHAN TANAH UNTUK PALAWIJA

JUN JUL AGU SEP OKT NOP DES

4.84 4.82 4.95 4.75 4.82 5.03 4.52

5.32 5.30 5.45 5.23 5.30 5.53 4.97 Eo = 1.1 Eto

7.32 7.30 7.45 7.23 7.30 7.53 6.97 P = 2.00 mm/hari

T = 15 hari

2.20 2.19 2.24 2.17 2.19 2.26 2.09 S = 50 mm

8.99 8.94 9.35 8.75 8.94 9.57 8.09

8.24 8.22 8.34 8.16 8.22 8.41 7.95 mm/hari

Page 17: Attachment

Faktor Koreksi ET Tanaman

Curah Hujan Mean 12.5 25 37.5 50 62.5 75 87.5

Bulanan (mm)

Curah Hujan Efektif Rata-rata Bulanan (mm)

ET Tanaman 25 8 16 24 0 0 0 0

Rata-rata 50 8 17 25 32 37 46 0

Bulanan 75 9 18 27 34 41 48 56

(mm) 100 9 19 28 35 43 52 59

125 10 20 30 37 46 54 62

150 10 21 31 39 49 57 66

175 11 23 32 42 52 61 69

200 11 24 33 44 54 64 73

225 12 25 35 47 57 68 78

250 13 25 38 50 60 72 84

Tampungan Efektif 20 25 38 50 63 75

Faktor Tampungan 0.73 0.77 0.86 0.93 0.97 1.00

168.6888 162.5102 176.4537 256.729 36.8095 0 0Et mm/bln 179.8705 165.9764 181.4909 167.795 138.711 166.85 171.77Interpolasi 1 121.96 112.01 126.93 133.00 29.45 10.00 10.00Interpolasi 2 129.46 118.01 134.93 141.00 30.45 11.00 11.00Interpolasi 3 123.42 115.84 129.01 138.69 30.00 10.67 10.87

D21
Hujan bulanan pada sheet hujan effektif palawija
D22
ET crop pada hujan eff palawija
Page 18: Attachment

Faktor Koreksi ET Tanaman

100 112.5 125 137.5 150 ### 175 ### 200

Curah Hujan Efektif Rata-rata Bulanan (mm)

0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0

62 69 0 0 0 0 0 0 0

66 73 80 87 94 100 0 0 0

70 76 85 92 98 107 116 120 0

74 81 89 97 104 112 119 127 133

78 86 95 103 111 118 126 134 141

82 91 100 109 117 125 134 142 150

87 96 106 115 124 132 141 150 159

92 102 112 121 132 140 150 158 167

100 125 150 175 200

1.02 1.04 1.06 1.07 1.08

2.54949 0 0 75.429 74.873176.63 164.03 171.768 173.44 161.0711.00 10.00 10.00 57.31 32.5611.00 11.00 11.00 61.27 33.5011.00 10.56 10.87 61.03 32.98

Page 19: Attachment

Lampiran 5.7.

HUJAN EFEKTIF UNTUK PALAWIJA

NO B U L A N JAN PEB MAR

1 168.69 162.51 176.45

2 179.87 165.98 181.49

3 Faktor Tampungan 1.06 1.06 1.06

4 123.42 115.84 129.01

5 130.83 122.79 136.75

Re ( mm / hari ) 4.22 4.39 4.41

0 12.5 1500 10.00 9

12.50 25.0010.00 1.00

0.8 0.00 0.04

Hujan Bulanan ( 20 % kering)

ET Crop Rata-rata Bulanan

Hujan Efektif Bulanan (mm)

Koreksi Hujan Efektif (mm)

Page 20: Attachment

Lampiran 5.7.

HUJAN EFEKTIF UNTUK PALAWIJA

APR MEI JUN JUL AGU SEP OKT NOP

256.73 36.81 0.00 0.00 2.55 0.00 0.00 75.43

167.80 138.71 166.85 171.77 176.63 164.03 171.77 173.44

1.06 1.06 1.06 1.06 1.06 1.06 1.06 1.06

138.69 30.00 10.67 10.87 11.00 10.56 10.87 61.03

147.02 31.80 11.31 11.52 11.66 11.19 37.08 87.53

4.90 1.03 0.38 0.37 0.38 0.37 1.20 2.92

17510.00

9.87 9.87

Page 21: Attachment

Lampiran 5.7.

HUJAN EFEKTIF UNTUK PALAWIJA

DES KETERANGAN

74.87

ETc x c x n hari ( mm )

161.07 --- > ( c = 1.15 )

Tabel A.2.7 hal. 174

1.06 Buku KP-01

Tabel A.2.7 hal. 174

32.98 Buku KP-01

118.69 (5) = (3) x (4)

3.83 (5) : n hari

Page 22: Attachment

Lampiran 5 - 11 gKEBUTUHAN AIR IRIGASI UNTUK TANAMAN PALAWIJA ( KACANG TANAH )

DAERAH IRIGASI CIJANGKELOK

B U L A N JAN PEB MAREto (penman) ( mm / hari ) 0.50 0.52 0.51

Eo = 1,1 x Eto ( mm / hari ) 5.55 5.67 5.60

Re terkoreksi ( Re.t ) ( mm / hari ) 4.22 4.39 4.41

1 0.5 EVAPOTRAN- 3.19 3.26 3.22

Koefisie 2 0.59 SPIRASI 3.77 3.85 3.80

Tanaman 3 0.96 TANAMAN 6.13 6.26 6.18

( Kc ) 4 1.05 Etc = 6.70 6.85 6.76

5 1.02 Eo X Kc X 1.15 6.51 6.65 6.57

6 0.95 6.06 6.19 6.12

PENGOLAHAN TANA IR 9.38 9.31 9.36

50 mm IR-Re.t A 5.16 4.92 4.95

SELAMA 15 HARI A x 0.116 B 0.60 0.57 0.57

P E R T U M B U H A N

KEBUTUHAN AIR ETc.1-Re.t A 0.00 0.00 0.00

2 MINGGU KE 1 A x 0.116 B 0.00 0.00 0.00

KEBUTUHAN AIR ETc.2-Re.t A 0.00 0.00 0.00

2 MINGGU KE 2 A x 0.116 B 0.00 0.00 0.00

KEBUTUHAN AIR ETc.3-Re.t A 1.91 1.87 1.77

2 MINGGU KE 3 A x 0.116 B 0.22 0.22 0.21

KEBUTUHAN AIR ETc.4-Re.t A 2.48 2.46 2.35

2 MINGGU KE 4 A x 0.116 B 0.29 0.29 0.27

KEBUTUHAN AIR ETc.5-Re.t A 2.29 2.27 2.16

2 MINGGU KE 5 A x 0.116 B 0.27 0.26 0.25

KEBUTUHAN AIR ETc.6-Re.t A 1.84 1.81 1.71

2 MINGGU KE 6 A x 0.116 B 0.21 0.21 0.20 Catatan : A = kebutuhan air ( mm / hari ) B = kebutuhan air ( lt / dt / ha )

Page 23: Attachment

Lampiran 5 - 11 gKEBUTUHAN AIR IRIGASI UNTUK TANAMAN PALAWIJA ( KACANG TANAH )

DAERAH IRIGASI CIJANGKELOK

APR MEI JUN JUL AGU SEP OKT NOP DES0.49 0.39 0.48 0.48 0.50 0.48 0.48 0.50 0.45

5.35 4.28 5.32 5.30 5.45 5.23 5.30 5.53 4.97

4.90 1.03 0.38 0.37 0.38 0.37 1.20 2.92 3.83

3.08 2.46 3.06 3.05 3.13 3.01 3.05 3.18 2.86

3.63 2.90 3.61 3.60 3.70 3.55 3.60 3.75 3.37

5.91 4.73 5.87 5.85 6.02 5.77 5.85 6.11 5.49

6.46 5.17 6.42 6.40 6.58 6.32 6.40 6.68 6.00

6.28 5.02 6.24 6.22 6.39 6.13 6.22 6.49 5.83

5.84 4.68 5.81 5.79 5.95 5.71 5.79 6.04 5.43

9.09 9.03 9.07 9.03 9.18 8.91 9.04 9.24 9.19

4.19 8.01 8.69 8.65 8.80 8.53 7.85 6.32 5.37

0.49 0.93 1.01 1.00 1.02 0.99 0.91 0.73 0.62

0.00 1.44 2.68 2.68 2.76 2.63 1.85 0.26 0.00

0.00 0.17 0.31 0.31 0.32 0.31 0.21 0.03 0.00

0.00 1.88 3.23 3.22 3.32 3.18 2.40 0.83 0.00

0.00 0.22 0.37 0.37 0.39 0.37 0.28 0.10 0.00

1.01 3.70 5.50 5.48 5.64 5.40 4.66 3.19 1.66

0.12 0.43 0.64 0.64 0.65 0.63 0.54 0.37 0.19

1.56 4.14 6.05 6.03 6.20 5.94 5.20 3.76 2.17

0.18 0.48 0.70 0.70 0.72 0.69 0.60 0.44 0.25

1.38 3.99 5.86 5.85 6.02 5.76 5.02 3.57 2.00

0.16 0.46 0.68 0.68 0.70 0.67 0.58 0.41 0.23

0.94 3.65 5.43 5.42 5.58 5.34 4.59 3.12 1.60

0.11 0.42 0.63 0.63 0.65 0.62 0.53 0.36 0.19

Page 24: Attachment

RENCANA POLA TANAMDAERAH IRIGASI _______ HA

UNTUK AREAL POTENSIAL DENGAN SISTEM 1 GOLONGAN

U R A I A NOKTOBER

I II

DAERAH IRIGASI

GOLONGAN I

LUAS AREAL = 2.816 Ha

0.00 1.26

lt / dt / ha 1.26 0.82

KEBUTUHAN AIR ( lt /dt / ha ) RATA-RATA 0.63 1.04

RATA-RATA 0.42 0.69

KEBUTUHAN AIR ( lt / dt / ha ) 0.63 1.04

UNTUK `1 GOLONGAN DI PETAK SAWAH

SALURAN TERSIER ( lt / dt / ha ) 0.76 1.25

SALURAN SEKUNDER ( lt / dt / ha ) 0.89 1.47

SALURAN PRIMER ( lt / dt / ha ) 0.97 1.59

0.64 1.06

UNTUK 3 GOLONGAN DI SALURAN PRIMER

(0.51) (0.51)

KEANDALAN ( % ) (79.73) (48.46)

CATATAN:

DEBIT ANDALAN DARI PENCATATAN DEBIT SUNGAI NORMAL 1/2 BULANAN RATA-RATA

DI LOKASI BENDUNG COLO ( TH 1986 - TH 2004 )

DEBIT KEBUTUHAN AIR ( m3 / dt )

DEBIT KEBUTUHAN AIR ( m3 / dt )

DEBIT ANDALAN (m3 / dt )

Page 25: Attachment

URAIANOKTOBER

I II

0.64 1.06

UNTUK 3 GOLONGAN DI SALURAN PRIMER

-0.51 -0.51

KEANDALAN ( % ) -79.73 -48.46

KEBUTUHAN AIR ( m3 / dt )

DEBIT ANDALAN (m3 / dt )

IISEPTEMBER

I

IIAGUSTUS

I

IIJULI I

IIJUNI I

IIMEI I

IIAPRIL I

IIMARE

TI

IIPE-BRUARI

I

IIJAN

UARII

IIDE-SEMBER

I

IINOPEMBER

I

IIOKTOBER

I

-1.00

0.00

1.00

2.00

3.00

4.00

5.00

0.6

4

1.0

6

1.0

8

1.3

3

1.2

0

1.2

1

0.9

3

0.4

0

0.6

4

0.9

5

0.9

8

1.1

2

1.1

6

1.1

7

0.9

6

0.4

7

0.6

3

0.6

7

0.3

5

0.5

1

0.7

0

0.7

2

0.6

6

0.3

2

-0.5

1

-0.5

1

0.6

5

0.6

5

0.8

5

0.8

5 2.2

4

2.2

4

2.7

3

2.7

3

2.9

9

2.9

9 4

.61

4.6

1

0.7

4

0.7

4

0.4

1

0.4

1

0.1

6

0.1

6

0.0

7

0.0

7

-0.3

4

-0.3

4

GRAFIK NERACA AIR (WATER BALANCE) RENCANA POLA TANAMDAERAH IRIGASI

LUAS TANAM AREAL POTENSIAL = HA

KEBUTUHAN AIR ( m3 / dt ) DEBIT ANDALAN (m3 / dt )

DEB

IT (

m3/d

et)

Page 26: Attachment

CATATAN :

DEBIT ANDALAN DARI PENCATATAN DEBIT NORMAL 1/2 BULANAN RATA-RATA

DILOKASI BENDUNG COLO UNTUK INTAKE COLO BARAT ( TH 1986 - TH 2005 )

Page 27: Attachment

URAIANOKTOBER

I II

0.00 0.00

UNTUK 3 GOLONGAN DI SALURAN PRIMER

0.00 0.00

KEANDALAN ( % ) 0.00 0.00

CATATAN :

DEBIT ANDALAN DARI PENCATATAN DEBIT NORMAL 1/2 BULANAN RATA-RATA

DILOKASI BENDUNG COLO UNTUK INTAKE COLO BARAT ( TH 1986 - TH 2005 )

KEBUTUHAN AIR ( m3 / dt )

DEBIT ANDALAN (m3 / dt )

Page 28: Attachment

RENCANA POLA TANAMDAERAH IRIGASI _______ HA

UNTUK AREAL POTENSIAL DENGAN SISTEM 1 GOLONGAN

NOPEMBER DESEMBER JANUARI PEBRUARI MARET

I II I II I II I II I

0.82 1.29 1.17 1.20 1.15 0.67 0.13 1.12 0.82

1.29 1.32 1.20 1.18 0.67 0.12 1.12 0.73 1.10

1.06 1.30 1.18 1.19 0.91 0.39 0.62 0.93 0.96

0.70 0.87 0.79 0.79 0.61 0.26 0.42 0.62 0.64

1.06 1.30 1.18 1.19 0.91 0.39 0.62 0.93 0.96

1.27 1.56 1.42 1.43 1.09 0.47 0.75 1.11 1.15

1.49 1.85 1.67 1.68 1.29 0.56 0.88 1.31 1.36

1.61 1.99 1.81 1.82 1.39 0.60 0.95 1.42 1.47

1.08 1.33 1.20 1.21 0.93 0.40 0.64 0.95 0.98

0.65 0.65 0.85 0.85 2.24 2.24 2.73 2.73 2.99

60.09 48.63 70.80 70.33 100.00 100.00 100.00 100.00 100.00

DEBIT ANDALAN DARI PENCATATAN DEBIT SUNGAI NORMAL 1/2 BULANAN RATA-RATA

PADI = 666,22 HA

Page 29: Attachment

NOPEMBER DESEMBER JANUARI PEBRUARI MARET

I II I II I II I II I

1.08 1.33 1.20 1.21 0.93 0.40 0.64 0.95 0.98

0.65 0.65 0.85 0.85 2.24 2.24 2.73 2.73 2.99

60.09 48.63 70.80 70.33 100.00 100.00 100.00 100.00 100.00

II

SEPTEMBER

I

IIAGUSTUS

I

IIJULI I

IIJUNI I

IIMEI I

IIAPRIL I

IIMARE

TI

IIPE-BRUARI

I

IIJAN

UARII

IIDE-SEMBER

I

IINOPEMBER

I

IIOKTOBER

I

-1.00

0.00

1.00

2.00

3.00

4.00

5.00

0.6

4

1.0

6

1.0

8

1.3

3

1.2

0

1.2

1

0.9

3

0.4

0

0.6

4

0.9

5

0.9

8

1.1

2

1.1

6

1.1

7

0.9

6

0.4

7

0.6

3

0.6

7

0.3

5

0.5

1

0.7

0

0.7

2

0.6

6

0.3

2

-0.5

1

-0.5

1

0.6

5

0.6

5

0.8

5

0.8

5 2.2

4

2.2

4

2.7

3

2.7

3

2.9

9

2.9

9 4

.61

4.6

1

0.7

4

0.7

4

0.4

1

0.4

1

0.1

6

0.1

6

0.0

7

0.0

7

-0.3

4

-0.3

4

GRAFIK NERACA AIR (WATER BALANCE) RENCANA POLA TANAMDAERAH IRIGASI

LUAS TANAM AREAL POTENSIAL = HA

KEBUTUHAN AIR ( m3 / dt ) DEBIT ANDALAN (m3 / dt )

DEB

IT (

m3/d

et)

Page 30: Attachment

DEBIT ANDALAN DARI PENCATATAN DEBIT NORMAL 1/2 BULANAN RATA-RATA

DILOKASI BENDUNG COLO UNTUK INTAKE COLO BARAT ( TH 1986 - TH 2005 )

Page 31: Attachment

NOPEMBER DESEMBER JANUARI PEBRUARI MARET

I II I II I II I II I

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

DEBIT ANDALAN DARI PENCATATAN DEBIT NORMAL 1/2 BULANAN RATA-RATA

DILOKASI BENDUNG COLO UNTUK INTAKE COLO BARAT ( TH 1986 - TH 2005 )

Page 32: Attachment

RENCANA POLA TANAMDAERAH IRIGASI _______ HA

UNTUK AREAL POTENSIAL DENGAN SISTEM 1 GOLONGAN

MARET APRIL MEI JUNI JULI

II I II I II I II I II

1.10 1.12 1.15 1.17 0.71 0.23 1.01 0.31 0.37

1.11 1.15 1.14 0.71 0.21 1.01 0.31 0.37 0.64

1.10 1.14 1.14 0.94 0.46 0.62 0.66 0.34 0.50

0.74 0.76 0.76 0.63 0.31 0.41 0.44 0.23 0.34

1.10 1.14 1.14 0.94 0.46 0.62 0.66 0.34 0.50

1.32 1.36 1.37 1.13 0.56 0.74 0.79 0.41 0.61

1.56 1.61 1.62 1.33 0.66 0.88 0.93 0.48 0.71

1.69 1.74 1.75 1.44 0.71 0.95 1.01 0.52 0.77

1.12 1.16 1.17 0.96 0.47 0.63 0.67 0.35 0.51

2.99 4.61 4.61 0.74 0.74 0.41 0.41 0.16 0.16

100.00 100.00 100.00 76.90 100.00 64.65 60.78 46.28 31.37

PADI = 666,22 HA PALAWIJA = 666,22 HA

Page 33: Attachment

MARET APRIL MEI JUNI JULI

II I II I II I II I II

1.12 1.16 1.17 0.96 0.47 0.63 0.67 0.35 0.51

2.99 4.61 4.61 0.74 0.74 0.41 0.41 0.16 0.16

100.00 100.00 100.00 76.90 100.00 64.65 60.78 46.28 31.37

II

SEPTEMBER

I

IIAGUSTUS

I

IIJULI I

IIJUNI I

IIMEI I

IIAPRIL I

IIMARE

TI

IIPE-BRUARI

I

IIJAN

UARII

IIDE-SEMBER

I

IINOPEMBER

I

IIOKTOBER

I

-1.00

0.00

1.00

2.00

3.00

4.00

5.00

0.6

4

1.0

6

1.0

8

1.3

3

1.2

0

1.2

1

0.9

3

0.4

0

0.6

4

0.9

5

0.9

8

1.1

2

1.1

6

1.1

7

0.9

6

0.4

7

0.6

3

0.6

7

0.3

5

0.5

1

0.7

0

0.7

2

0.6

6

0.3

2

-0.5

1

-0.5

1

0.6

5

0.6

5

0.8

5

0.8

5 2.2

4

2.2

4

2.7

3

2.7

3

2.9

9

2.9

9 4

.61

4.6

1

0.7

4

0.7

4

0.4

1

0.4

1

0.1

6

0.1

6

0.0

7

0.0

7

-0.3

4

-0.3

4

GRAFIK NERACA AIR (WATER BALANCE) RENCANA POLA TANAMDAERAH IRIGASI

LUAS TANAM AREAL POTENSIAL = HA

KEBUTUHAN AIR ( m3 / dt ) DEBIT ANDALAN (m3 / dt )

DEB

IT (

m3/d

et)

Page 34: Attachment

MARET APRIL MEI JUNI JULI

II I II I II I II I II

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Page 35: Attachment

RENCANA POLA TANAMDAERAH IRIGASI _______ HA

UNTUK AREAL POTENSIAL DENGAN SISTEM 1 GOLONGAN

AGUSTUS SEPTEMBERKETERANGAN

I II I II

LUAS AREAL TANAM :

GOLONGAN I : 666.22 Ha

MASA TANAM I PADI

666.22

0.65 0.72 0.67 0.62 MASA TANAM II PADI

0.72 0.70 0.62 0.00 666.62

MASA TANAM III PALAWIJA

666.62

0.69 0.71 0.64 0.31

0.46 0.47 0.43 0.21 = MASA PERTUMBUHAN

0.69 0.71 0.64 0.31 = PENGOLAHAN TANAH

= PENGERINGAN

0.82 0.85 0.77 0.37 Koefisien :

0.97 1.00 0.91 0.44 - Saluran Tersier = 1.20

1.05 1.08 0.98 0.47 - Saluran Sekunder = 1.18

- Saluran Primer = 1.08

0.70 0.72 0.66 0.32

Kebutuhan Air ( lt / dt / ha ) :

- Petak Sawah = 1.30

0.07 0.07 (0.34) (0.34) - Saluran Tersier = 1.56

- Saluran Sekunder = 1.85

10.57 10.25 (52.57) (109.29) - Saluran Primer = 1.99

PALAWIJA = 666,22 HA

Page 36: Attachment

AGUSTUS SEPTEMBER

I II I II

0.70 0.72 0.66 0.32

0.07 0.07 -0.34 -0.34

10.57 10.25 -52.57 -109.29

II

SEPTEMBER

I

IIAGUSTUS

I

IIJULI I

IIJUNI I

IIMEI I

IIAPRIL I

IIMARE

TI

IIPE-BRUARI

I

IIJAN

UARII

IIDE-SEMBER

I

IINOPEMBER

I

IIOKTOBER

I

-1.00

0.00

1.00

2.00

3.00

4.00

5.00

0.6

4

1.0

6

1.0

8

1.3

3

1.2

0

1.2

1

0.9

3

0.4

0

0.6

4

0.9

5

0.9

8

1.1

2

1.1

6

1.1

7

0.9

6

0.4

7

0.6

3

0.6

7

0.3

5

0.5

1

0.7

0

0.7

2

0.6

6

0.3

2

-0.5

1

-0.5

1

0.6

5

0.6

5

0.8

5

0.8

5 2.2

4

2.2

4

2.7

3

2.7

3

2.9

9

2.9

9 4

.61

4.6

1

0.7

4

0.7

4

0.4

1

0.4

1

0.1

6

0.1

6

0.0

7

0.0

7

-0.3

4

-0.3

4

GRAFIK NERACA AIR (WATER BALANCE) RENCANA POLA TANAMDAERAH IRIGASI

LUAS TANAM AREAL POTENSIAL = HA

KEBUTUHAN AIR ( m3 / dt ) DEBIT ANDALAN (m3 / dt )

DEB

IT (

m3/d

et)

Page 37: Attachment

AGUSTUS SEPTEMBER

I II I II

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

Page 38: Attachment

GOL 1 GOL 2 GOL 3INDUK 1174.5 2,816.00 1,684.50 #REF! Potensial

LS1 223 2,816.00 1,007.00 #REF! Fungsional

LS2 686.5 #REF!

LS2A 161 #REF!

LS3 224

LS4 347LS5 210.00 LS5A 1231.5 677.5LS SUB 5A 44

LS6 199

Lebo

26.449

= MASA PERTUMBUHAN 85.795

23.408

= PENGOLAHAN TANAH 69.387

44.898

249.937

Kebondalem

93.427

24.149

46.938

51.308

215.822

Tanjungsari

59.183

18.669

77.852

Tambaksari

44.798

21.506

25.367

91.671

Page 39: Attachment

Tanjunganom30.938

30.938

666.220

Page 40: Attachment

RENCANA POLA TANAMDAERAH IRIGASI _______ HA

UNTUK AREAL POTENSIAL DENGAN SISTEM 1 GOLONGAN

U R A I A NJANUARI

I II

DAERAH IRIGASI

GOLONGAN I

LUAS AREAL = 2.816 Ha

0.00 1.19

lt / dt / ha 1.19 0.82

KEBUTUHAN AIR ( lt /dt / ha ) RATA-RATA 0.60 1.01

RATA-RATA 0.40 0.67

KEBUTUHAN AIR ( lt / dt / ha ) 0.60 1.01

UNTUK `1 GOLONGAN DI PETAK SAWAH

SALURAN TERSIER ( lt / dt / ha ) 0.72 1.21

SALURAN SEKUNDER ( lt / dt / ha ) 0.85 1.43

SALURAN PRIMER ( lt / dt / ha ) 0.91 1.54

0.61 1.03

UNTUK 3 GOLONGAN DI SALURAN PRIMER

(0.51) (0.51)

KEANDALAN ( % ) (84.38) (49.94)

CATATAN:

DEBIT ANDALAN DARI PENCATATAN DEBIT SUNGAI NORMAL 1/2 BULANAN RATA-RATA

DI LOKASI BENDUNG COLO ( TH 1986 - TH 2004 )

DEBIT KEBUTUHAN AIR ( m3 / dt )

DEBIT KEBUTUHAN AIR ( m3 / dt )

DEBIT ANDALAN (m3 / dt )

Page 41: Attachment

URAIANJANUARI

I II

0.61 1.03

UNTUK 3 GOLONGAN DI SALURAN PRIMER

-0.51 -0.51

KEANDALAN ( % ) -84.376235 -49.94

KEBUTUHAN AIR ( m3 / dt )

DEBIT ANDALAN (m3 / dt )

IIDE-SEMBER

I

IINOPEMBER

I

IIOKTOBER

I

IISEPTEMBER

I

IIAGUSTUS

I

IIJULI I

IIJUNI I

IIMEI I

IIAPRIL I

IIMARE

TI

IIFEBRUARI

I

IIJAN

UARII

-1.00

0.00

1.00

2.00

3.00

4.00

5.00

0.6

1

1.0

3

0.9

6

1.1

8

1.1

5

1.1

6

0.9

2

0.4

0

0.7

0

1.0

0

1.0

7

1.3

4

1.3

7

1.3

8

1.1

5

0.5

7

0.6

2

0.6

6

0.2

5

0.4

2

0.4

1

0.4

3

0.2

1

0.0

9

-0.5

1

-0.5

1

0.6

5

0.6

5

0.8

5

0.8

5 2.2

4

2.2

4

2.7

3

2.7

3

2.9

9

2.9

9 4.6

1

4.6

1

0.7

4

0.7

4

0.4

1

0.4

1

0.1

6

0.1

6

0.0

7

0.0

7

-0.3

4

-0.3

4

GRAFIK NERACA AIR (WATER BALANCE) RENCANA POLA TANAMDAERAH IRIGASI

LUAS TANAM AREAL POTENSIAL = HA

KEBUTUHAN AIR ( m3 / dt ) DEBIT ANDALAN (m3 / dt )

DEB

IT (

m3/d

et)

Page 42: Attachment

CATATAN :

DEBIT ANDALAN DARI PENCATATAN DEBIT NORMAL 1/2 BULANAN RATA-RATA

DILOKASI BENDUNG COLO UNTUK INTAKE COLO BARAT ( TH 1986 - TH 2005 )

Page 43: Attachment

URAIANOKTOBER

I II

0.00 0.00

UNTUK 3 GOLONGAN DI SALURAN PRIMER

0.00 0.00

KEANDALAN ( % ) 0.00 0.00

CATATAN :

DEBIT ANDALAN DARI PENCATATAN DEBIT NORMAL 1/2 BULANAN RATA-RATA

DILOKASI BENDUNG COLO UNTUK INTAKE COLO BARAT ( TH 1986 - TH 2005 )

KEBUTUHAN AIR ( m3 / dt )

DEBIT ANDALAN (m3 / dt )

Page 44: Attachment

RENCANA POLA TANAMDAERAH IRIGASI _______ HA

UNTUK AREAL POTENSIAL DENGAN SISTEM 1 GOLONGAN

FEBRUARI MARET APRIL MEI JUNI

I II I II I II I II I

0.73 1.15 1.11 1.14 1.14 0.66 0.21 1.17 0.82

1.15 1.17 1.14 1.13 0.66 0.12 1.17 0.80 1.29

0.94 1.16 1.13 1.14 0.90 0.39 0.69 0.98 1.05

0.63 0.77 0.75 0.76 0.60 0.26 0.46 0.65 0.70

0.94 1.16 1.13 1.14 0.90 0.39 0.69 0.98 1.05

1.13 1.39 1.35 1.36 1.08 0.47 0.83 1.18 1.26

1.33 1.64 1.59 1.61 1.27 0.56 0.98 1.39 1.49

1.44 1.77 1.72 1.74 1.38 0.60 1.06 1.50 1.61

0.96 1.18 1.15 1.16 0.92 0.40 0.70 1.00 1.07

0.65 0.65 0.85 0.85 2.24 2.24 2.73 2.73 2.99

67.26 54.75 74.23 73.66 100.00 100.00 100.00 100.00 100.00

DEBIT ANDALAN DARI PENCATATAN DEBIT SUNGAI NORMAL 1/2 BULANAN RATA-RATA

PADI = 666,22 HA

Page 45: Attachment

FEBRUARI MARET APRIL MEI JUNI

I II I II I II I II I

0.96 1.18 1.15 1.16 0.92 0.40 0.70 1.00 1.07

0.65 0.65 0.85 0.85 2.24 2.24 2.73 2.73 2.99

67.26 54.75 74.23 73.66 100.00 100.00 100.00 100.00 100.00

II

DE-SEMBER

I

IINOPEMBER

I

IIOKTOBER

I

IISEPTEMBER

I

IIAGUSTUS

I

IIJULI I

IIJUNI I

IIMEI I

IIAPRIL I

IIMARE

TI

IIFEBRUARI

I

IIJAN

UARII

-1.00

0.00

1.00

2.00

3.00

4.00

5.00

0.6

1

1.0

3

0.9

6

1.1

8

1.1

5

1.1

6

0.9

2

0.4

0

0.7

0

1.0

0

1.0

7

1.3

4

1.3

7

1.3

8

1.1

5

0.5

7

0.6

2

0.6

6

0.2

5

0.4

2

0.4

1

0.4

3

0.2

1

0.0

9

-0.5

1

-0.5

1

0.6

5

0.6

5

0.8

5

0.8

5 2.2

4

2.2

4

2.7

3

2.7

3

2.9

9

2.9

9 4.6

1

4.6

1

0.7

4

0.7

4

0.4

1

0.4

1

0.1

6

0.1

6

0.0

7

0.0

7

-0.3

4

-0.3

4

GRAFIK NERACA AIR (WATER BALANCE) RENCANA POLA TANAMDAERAH IRIGASI

LUAS TANAM AREAL POTENSIAL = HA

KEBUTUHAN AIR ( m3 / dt ) DEBIT ANDALAN (m3 / dt )

DEB

IT (

m3/d

et)

Page 46: Attachment

DEBIT ANDALAN DARI PENCATATAN DEBIT NORMAL 1/2 BULANAN RATA-RATA

DILOKASI BENDUNG COLO UNTUK INTAKE COLO BARAT ( TH 1986 - TH 2005 )

Page 47: Attachment

NOPEMBER DESEMBER JANUARI PEBRUARI MARET

I II I II I II I II I

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

DEBIT ANDALAN DARI PENCATATAN DEBIT NORMAL 1/2 BULANAN RATA-RATA

DILOKASI BENDUNG COLO UNTUK INTAKE COLO BARAT ( TH 1986 - TH 2005 )

Page 48: Attachment

RENCANA POLA TANAMDAERAH IRIGASI _______ HA

UNTUK AREAL POTENSIAL DENGAN SISTEM 1 GOLONGAN

JUNI JULI AGUSTUS SEPTEMBER OKTOBER

II I II I II I II I II

1.29 1.33 1.36 1.36 0.89 0.23 0.99 0.21 0.28

1.33 1.36 1.34 0.89 0.23 0.99 0.31 0.28 0.54

1.31 1.34 1.35 1.13 0.56 0.61 0.65 0.25 0.41

0.87 0.90 0.90 0.75 0.37 0.41 0.43 0.16 0.27

1.31 1.34 1.35 1.13 0.56 0.61 0.65 0.25 0.41

1.57 1.61 1.62 1.35 0.67 0.73 0.78 0.30 0.49

1.86 1.90 1.92 1.60 0.79 0.86 0.92 0.35 0.58

2.01 2.06 2.07 1.72 0.86 0.93 0.99 0.38 0.63

1.34 1.37 1.38 1.15 0.57 0.62 0.66 0.25 0.42

2.99 4.61 4.61 0.74 0.74 0.41 0.41 0.16 0.16

100.00 100.00 100.00 64.21 100.00 65.70 61.89 64.22 38.70

PADI = 666,22 HA PALAWIJA = 666,22 HA

Page 49: Attachment

JUNI JULI AGUSTUS SEPTEMBER OKTOBER

II I II I II I II I II

1.34 1.37 1.38 1.15 0.57 0.62 0.66 0.25 0.42

2.99 4.61 4.61 0.74 0.74 0.41 0.41 0.16 0.16

100.00 100.00 100.00 64.21 100.00 65.70 61.89 64.22 38.70

II

DE-SEMBER

I

IINOPEMBER

I

IIOKTOBER

I

IISEPTEMBER

I

IIAGUSTUS

I

IIJULI I

IIJUNI I

IIMEI I

IIAPRIL I

IIMARE

TI

IIFEBRUARI

I

IIJAN

UARII

-1.00

0.00

1.00

2.00

3.00

4.00

5.00

0.6

1

1.0

3

0.9

6

1.1

8

1.1

5

1.1

6

0.9

2

0.4

0

0.7

0

1.0

0

1.0

7

1.3

4

1.3

7

1.3

8

1.1

5

0.5

7

0.6

2

0.6

6

0.2

5

0.4

2

0.4

1

0.4

3

0.2

1

0.0

9

-0.5

1

-0.5

1

0.6

5

0.6

5

0.8

5

0.8

5 2.2

4

2.2

4

2.7

3

2.7

3

2.9

9

2.9

9 4.6

1

4.6

1

0.7

4

0.7

4

0.4

1

0.4

1

0.1

6

0.1

6

0.0

7

0.0

7

-0.3

4

-0.3

4

GRAFIK NERACA AIR (WATER BALANCE) RENCANA POLA TANAMDAERAH IRIGASI

LUAS TANAM AREAL POTENSIAL = HA

KEBUTUHAN AIR ( m3 / dt ) DEBIT ANDALAN (m3 / dt )

DEB

IT (

m3/d

et)

Page 50: Attachment

MARET APRIL MEI JUNI JULI

II I II I II I II I II

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Page 51: Attachment

RENCANA POLA TANAMDAERAH IRIGASI _______ HA

UNTUK AREAL POTENSIAL DENGAN SISTEM 1 GOLONGAN

NOPEMBER DESEMBERKETERANGAN

I II I II

LUAS AREAL TANAM :

GOLONGAN I : 666.22 Ha

MASA TANAM I PADI

666.22

0.37 0.44 0.23 0.19 MASA TANAM II PADI

0.44 0.41 0.19 0.00 666.62

MASA TANAM III PALAWIJA

666.62

0.40 0.43 0.21 0.09

0.27 0.28 0.14 0.06 = MASA PERTUMBUHAN

0.40 0.43 0.21 0.09 = PENGOLAHAN TANAH

= PENGERINGAN

0.48 0.51 0.25 0.11 Koefisien :

0.57 0.60 0.30 0.13 - Saluran Tersier = 1.20

0.62 0.65 0.32 0.14 - Saluran Sekunder = 1.18

- Saluran Primer = 1.08

0.41 0.43 0.21 0.09

Kebutuhan Air ( lt / dt / ha ) :

- Petak Sawah = 1.35

0.07 0.07 (0.34) (0.34) - Saluran Tersier = 1.62

- Saluran Sekunder = 1.92

18.02 17.09 (162.04) (364.57) - Saluran Primer = 2.07

PALAWIJA = 666,22 HA

Page 52: Attachment

NOPEMBER DESEMBER

I II I II

0.41 0.43 0.21 0.09

0.07 0.07 -0.34 -0.34

18.02 17.09 -162.04 -364.57

II

DE-SEMBER

I

IINOPEMBER

I

IIOKTOBER

I

IISEPTEMBER

I

IIAGUSTUS

I

IIJULI I

IIJUNI I

IIMEI I

IIAPRIL I

IIMARE

TI

IIFEBRUARI

I

IIJAN

UARII

-1.00

0.00

1.00

2.00

3.00

4.00

5.00

0.6

1

1.0

3

0.9

6

1.1

8

1.1

5

1.1

6

0.9

2

0.4

0

0.7

0

1.0

0

1.0

7

1.3

4

1.3

7

1.3

8

1.1

5

0.5

7

0.6

2

0.6

6

0.2

5

0.4

2

0.4

1

0.4

3

0.2

1

0.0

9

-0.5

1

-0.5

1

0.6

5

0.6

5

0.8

5

0.8

5 2.2

4

2.2

4

2.7

3

2.7

3

2.9

9

2.9

9 4.6

1

4.6

1

0.7

4

0.7

4

0.4

1

0.4

1

0.1

6

0.1

6

0.0

7

0.0

7

-0.3

4

-0.3

4

GRAFIK NERACA AIR (WATER BALANCE) RENCANA POLA TANAMDAERAH IRIGASI

LUAS TANAM AREAL POTENSIAL = HA

KEBUTUHAN AIR ( m3 / dt ) DEBIT ANDALAN (m3 / dt )

DEB

IT (

m3/d

et)

Page 53: Attachment

AGUSTUS SEPTEMBER

I II I II

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

Page 54: Attachment

GOL 1 GOL 2 GOL 3INDUK 1174.5 2,816.00 1,684.50 #REF! Potensial

LS1 223 2,816.00 1,007.00 #REF! Fungsional

LS2 686.5 #REF!

LS2A 161 #REF!

LS3 224

LS4 347LS5 210.00 LS5A 1231.5 677.5LS SUB 5A 44

LS6 199

Lebo

26.449

= MASA PERTUMBUHAN 85.795

23.408

= PENGOLAHAN TANAH 69.387

44.898

249.937

Kebondalem

93.427

24.149

46.938

51.308

215.822

Tanjungsari

59.183

18.669

77.852

Tambaksari

44.798

21.506

25.367

91.671

Page 55: Attachment

Tanjunganom30.938

30.938

666.220

Page 56: Attachment

Debit Bulanan Metoda Dr. FJ MockTahun 2008 (awal)

No. Uraian Notasi Unit Januari Feb Maret April Mei

1 2 3 4 5 6 7 8 9

Data

1 Curah Hujan P mm/bulan 200.00 222.00 420.00 420.00 25.00

2 Hari Hujan n days 11.00 15.00 11.00 10.00 7.00

Limited Evapotranspiration

3 Evapotranspiration Ep = Eto mm/bulan 132.40 117.20 131.60 118.70 120.60

4 Exposed Surface m % % 70.00 60.00 50.00 40.00 40.00

5 (d/h) x m 0.45 0.28 0.32 0.27 0.31

6 E (5) x (3) mm/mt 59.79 32.65 42.45 31.65 37.35

7 Et = Ep - E (3) - (6) mm/mt 72.61 84.55 89.15 87.05 83.25

Water Balance

8 P - Et (1) - (7) mm/mt 127.39 137.45 330.85 332.95 -58.25

9 Precipitation Flood PF x (1) mm/mt 10 11.1 21 21 1.25

10 Soil Storage (8) - (9) mm/mt 117.39 126.35 309.85 311.95 -59.50

11 Soil Moisture SMC + (10) mm/mt 217.39 226.35 309.85 311.95 -59.50

12 Water Surplus 8 mm/mt 127.39 137.45 330.85 332.95 0.00

Run Off & Groundwater Storage

13 Infiltration (12) x l mm/mt 44.59 48.11 115.80 116.53 0.00

14 0,5 x (1+k) x l mm/mt 22.29 24.05 57.90 58.27 0.00

15 mm/mt 20.00 16.92 16.39 29.71 35.19

16 Storage Volume (14) + (15) mm/mt 42.29 40.97 74.29 87.98 35.19

17 mm/mt 22.22 -1.32 33.32 13.69 -52.79

18 Base Flow (13) - (17) mm/mt 22.37 49.43 82.48 102.84 52.79

19 Direct Run Off (12) - (13) mm/mt 82.81 89.34 215.05 216.42 0.00

20 Run Off (18) + (19) mm/mt 105.18 138.77 297.54 319.26 52.79

Effective Discharge

21 Effective Discharge 5.89 8.60 16.66 18.48 2.96

Note : k = 0.4

SMC = 100 mm

CA = 150

31 28 31 30 31

Debit Bulanan Metoda Dr. FJ MockTahun 2009 (awal)

k x V (n-1)

DVn = Vn - V (n-1)

m3/det

km2

E9
sheet 'Hujan Eva'
E13
dilihat dari hari hujan, bulan basah > 7 dan bulan kering =<7.. bulan kering naik 10%
E39
Jumlah hari tiap setengah bulan
Page 57: Attachment

No. Uraian Notasi Unit Januari Feb Maret April Mei

1 2 3 4 5 6 7 8 9

Data

1 Curah Hujan P mm/bulan 110.00 180.00 305.00 306.00 89.00

2 Hari Hujan n days 15.00 16.00 20.00 18.00 8.00

Limited Evapotranspiration

3 Evapotranspiration Ep = Eto mm/bulan 132.40 117.20 131.60 118.70 120.60

4 Exposed Surface m % % 80.00 70.00 60.00 50.00 50.00

5 (d/h) x m 0.41 0.30 0.21 0.20 0.37

6 E (5) x (3) mm/mt 54.67 35.16 28.02 23.74 44.74

7 Et = Ep - E (3) - (6) mm/mt 77.73 82.04 103.58 94.96 75.86

Water Balance

8 P - Et (1) - (7) mm/mt 32.27 97.96 201.42 211.04 13.14

9 Precipitation Flood PF x (1) mm/mt 5.5 9 15.25 15.3 4.45

10 Soil Storage (8) - (9) mm/mt 26.77 88.96 186.17 195.74 8.69

11 Soil Moisture SMC + (10) mm/mt 126.77 188.96 186.17 195.74 8.69

12 Water Surplus 8 mm/mt 32.27 97.96 201.42 211.04 13.14

Run Off & Groundwater Storage

13 Infiltration (12) x l mm/mt 11.29 34.29 70.50 73.86 4.60

14 0,5 x (1+k) x l mm/mt 5.65 17.14 35.25 36.93 2.30

15 mm/mt 20.00 10.26 10.96 18.48 22.17

16 Storage Volume (14) + (15) mm/mt 25.65 27.40 46.21 55.42 24.47

17 mm/mt -10.59 1.75 18.81 9.21 -30.95

18 Base Flow (13) - (17) mm/mt 21.89 32.53 51.69 64.66 35.55

19 Direct Run Off (12) - (13) mm/mt 20.97 63.67 130.92 137.18 8.54

20 Run Off (18) + (19) mm/mt 42.86 96.21 182.61 201.83 44.09

Effective Discharge

21 Effective Discharge 2.40 5.97 10.23 11.68 2.47

Note : k = 0.4

SMC = 100 mm

CA = 150

31 28 31 30 31

Debit Bulanan Metoda Dr. FJ MockTahun 2010 (awal)

No. Uraian Notasi Unit Januari Feb Maret April Mei

1 2 3 4 5 6 7 8 9

k x V (n-1)

DVn = Vn - V (n-1)

m3/det

km2

E53
sheet 'Hujan Eva'
E57
dilihat dari hari hujan, bulan basah > 7 dan bulan kering =<7.. bulan kering naik 10%
E83
Jumlah hari tiap setengah bulan
Page 58: Attachment

Data

1 Curah Hujan P mm/bulan 295.00 397.00 78.00 333.00 75.00

2 Hari Hujan n days 15.00 21.00 12.00 10.00 11.00

Limited Evapotranspiration

3 Evapotranspiration Ep = Eto mm/bulan 132.40 117.20 131.60 118.70 120.60

4 Exposed Surface m % % 70.00 60.00 50.00 40.00 30.00

5 (d/h) x m 0.36 0.15 0.31 0.27 0.19

6 E (5) x (3) mm/mt 47.83 17.58 40.33 31.65 23.34

7 Et = Ep - E (3) - (6) mm/mt 84.57 99.62 91.27 87.05 97.26

Water Balance

8 P - Et (1) - (7) mm/mt 210.43 297.38 -13.27 245.95 -22.26

9 Precipitation Flood PF x (1) mm/mt 14.75 19.85 3.9 16.65 3.75

10 Soil Storage (8) - (9) mm/mt 195.68 277.53 -17.17 229.30 -26.01

11 Soil Moisture SMC + (10) mm/mt 295.68 377.53 -17.17 229.30 -26.01

12 Water Surplus 8 mm/mt 210.43 297.38 0.00 245.95 0.00

Run Off & Groundwater Storage

13 Infiltration (12) x l mm/mt 73.65 104.08 0.00 86.08 0.00

14 0,5 x (1+k) x l mm/mt 36.83 52.04 0.00 43.04 0.00

15 mm/mt 20.00 22.73 29.91 11.96 22.00

16 Storage Volume (14) + (15) mm/mt 56.83 74.77 29.91 55.01 22.00

17 mm/mt 49.97 17.95 -44.86 25.10 -33.00

18 Base Flow (13) - (17) mm/mt 23.68 86.14 44.86 60.99 33.00

19 Direct Run Off (12) - (13) mm/mt 136.78 193.30 0.00 159.87 0.00

20 Run Off (18) + (19) mm/mt 160.47 279.43 44.86 220.86 33.00

Effective Discharge

21 Effective Discharge 8.99 17.33 2.51 12.78 1.85

Note : k = 0.4

SMC = 100 mm

CA = 150

31 28 31 30 31

Debit Bulanan Metoda Dr. FJ MockTahun 2011 (awal)

No. Uraian Notasi Unit Januari Feb Maret April Mei

1 2 3 4 5 6 7 8 9

Data

1 Curah Hujan P mm/bulan 425.00 340.00 256.00 256.00 194.00

2 Hari Hujan n days 12.00 16.00 17.00 11.00 7.00

Limited Evapotranspiration

3 Evapotranspiration Ep = Eto mm/bulan 132.40 117.20 131.60 118.70 120.60

k x V (n-1)

DVn = Vn - V (n-1)

m3/det

km2

E97
sheet 'Hujan Eva'
E101
dilihat dari hari hujan, bulan basah > 7 dan bulan kering =<7.. bulan kering naik 10%
E127
Jumlah hari tiap setengah bulan
E140
sheet 'Hujan Eva'
Page 59: Attachment

4 Exposed Surface m % % 40.00 30.00 30.00 30.00 30.00

5 (d/h) x m 0.25 0.13 0.14 0.19 0.23

6 E (5) x (3) mm/mt 32.46 15.07 17.83 22.55 28.01

7 Et = Ep - E (3) - (6) mm/mt 99.94 102.13 113.77 96.15 92.59

Water Balance

8 P - Et (1) - (7) mm/mt 325.06 237.87 142.23 159.85 101.41

9 Precipitation Flood PF x (1) mm/mt 21.25 17 12.8 12.8 9.7

10 Soil Storage (8) - (9) mm/mt 303.81 220.87 129.43 147.05 91.71

11 Soil Moisture SMC + (10) mm/mt 403.81 320.87 129.43 147.05 91.71

12 Water Surplus 8 mm/mt 325.06 237.87 142.23 159.85 101.41

Run Off & Groundwater Storage

13 Infiltration (12) x l mm/mt 113.77 83.25 49.78 55.95 35.49

14 0,5 x (1+k) x l mm/mt 56.89 41.63 24.89 27.97 17.75

15 mm/mt 20.00 30.75 28.95 21.54 19.80

16 Storage Volume (14) + (15) mm/mt 76.89 72.38 53.84 49.51 37.55

17 mm/mt 40.32 -4.50 -18.54 -4.33 -11.96

18 Base Flow (13) - (17) mm/mt 73.45 87.76 68.32 60.28 47.45

19 Direct Run Off (12) - (13) mm/mt 211.29 154.61 92.45 103.90 65.92

20 Run Off (18) + (19) mm/mt 284.74 242.37 160.77 164.18 113.37

Effective Discharge

21 Effective Discharge 15.95 15.03 9.00 9.50 6.35

Note : k = 0.4

SMC = 100 mm

CA = 150

31 28 31 30 31

Debit Bulanan Metoda Dr. FJ MockTahun 2012 (awal)

No. Uraian Notasi Unit Januari Feb Maret April Mei

1 2 3 4 5 6 7 8 9

Data

1 Curah Hujan P mm/bulan 318.00 136.00 406.00 255.00 66.00

2 Hari Hujan n days 10.00 15.00 16.00 19.00 16.00

Limited Evapotranspiration

3 Evapotranspiration Ep = Eto mm/bulan 132.40 117.20 131.60 118.70 120.60

4 Exposed Surface m % % 50.00 40.00 30.00 30.00 30.00

5 (d/h) x m 0.34 0.19 0.15 0.11 0.15

6 E (5) x (3) mm/mt 44.85 21.77 19.10 13.06 17.51

7 Et = Ep - E (3) - (6) mm/mt 87.55 95.43 112.50 105.64 103.09

Water Balance

k x V (n-1)

DVn = Vn - V (n-1)

m3/det

km2

E144
dilihat dari hari hujan, bulan basah > 7 dan bulan kering =<7.. bulan kering naik 10%
E170
Jumlah hari tiap setengah bulan
E183
sheet 'Hujan Eva'
E187
dilihat dari hari hujan, bulan basah > 7 dan bulan kering =<7.. bulan kering naik 10%
Page 60: Attachment

8 P - Et (1) - (7) mm/mt 230.45 40.57 293.50 149.36 -37.09

9 Precipitation Flood PF x (1) mm/mt 15.9 6.8 20.3 12.75 3.3

10 Soil Storage (8) - (9) mm/mt 214.55 33.77 273.20 136.61 -40.39

11 Soil Moisture SMC + (10) mm/mt 314.55 133.77 273.20 136.61 -40.39

12 Water Surplus 8 mm/mt 230.45 40.57 293.50 149.36 0.00

Run Off & Groundwater Storage

13 Infiltration (12) x l mm/mt 80.66 14.20 102.73 52.27 0.00

14 0,5 x (1+k) x l mm/mt 40.33 7.10 51.36 26.14 0.00

15 mm/mt 20.00 24.13 12.49 25.54 20.67

16 Storage Volume (14) + (15) mm/mt 60.33 31.23 63.86 51.68 20.67

17 mm/mt 41.36 -29.10 32.62 -12.18 -31.01

18 Base Flow (13) - (17) mm/mt 39.29 43.30 70.10 64.45 31.01

19 Direct Run Off (12) - (13) mm/mt 149.79 26.37 190.78 97.08 0.00

20 Run Off (18) + (19) mm/mt 189.08 69.66 260.88 161.53 31.01

Effective Discharge

21 Effective Discharge 10.59 4.32 14.61 9.35 1.74

Note : k = 0.4

SMC = 100 mm

CA = 150

31 28 31 30 31

k x V (n-1)

DVn = Vn - V (n-1)

m3/det

km2

E213
Jumlah hari tiap setengah bulan
Page 61: Attachment

Debit Bulanan Metoda Dr. FJ MockTahun 2008 (awal)

Juni Juli Ags Sept Okt Nov Des

10 11 12 13 14 15 16 17 18

24.00 0.00 0.00 56.00 0.00 125.00 152.00

4.00 0.00 3.00 2.00 0.00 4.00 15.00

117.80 120.30 125.40 112.80 120.80 123.40 133.70

50.00 60.00 70.00 80.00 90.00 90.00 80.00

0.43 0.60 0.63 0.75 0.90 0.78 0.41

51.05 72.18 79.29 84.22 108.72 96.25 55.21

66.75 48.12 46.11 28.58 12.08 27.15 78.49

-42.75 -48.12 -46.11 27.42 -12.08 97.85 73.51

1.2 0 0 2.8 0 6.25 7.6

-43.95 -48.12 -46.11 24.62 -12.08 91.60 65.91

-43.95 -48.12 -46.11 24.62 -12.08 91.60 65.91

0.00 0.00 0.00 27.42 0.00 97.85 73.51

0.00 0.00 0.00 9.60 0.00 34.25 25.73

0.00 0.00 0.00 4.80 0.00 17.12 12.86

14.08 5.63 2.25 0.90 2.28 0.91 7.21

14.08 5.63 2.25 5.70 2.28 18.04 20.08

-21.12 -8.45 -3.38 3.45 -3.42 15.76 2.04

21.12 8.45 3.38 6.15 3.42 18.49 23.69

0.00 0.00 0.00 17.83 0.00 63.60 47.78

21.12 8.45 3.38 23.98 3.42 82.10 71.46

1.22 0.47 0.19 1.39 0.19 4.75 4.00

I = 0.35

IS = 50 mm

PF = 0.05

30 31 31 30 31 30 31

Debit Bulanan Metoda Dr. FJ MockTahun 2009 (awal)

Page 62: Attachment

Juni Juli Ags Sept Okt Nov Des

10 11 12 13 14 15 16 17 18

0.00 64.00 23.00 0.00 205.00 150.00 190.00

7.00 1.00 0.00 0.00 1.00 5.00 10.00

117.80 120.30 125.40 112.80 120.80 123.40 133.70

50.00 60.00 70.00 80.00 90.00 90.00 80.00

0.38 0.58 0.70 0.80 0.87 0.75 0.54

45.16 69.85 87.78 90.24 105.21 92.55 72.46

72.64 50.45 37.62 22.56 15.59 30.85 61.24

-72.64 13.55 -14.62 -22.56 189.41 119.15 128.76

0 3.2 1.15 0 10.25 7.5 9.5

-72.64 10.35 -15.77 -22.56 179.16 111.65 119.26

-72.64 10.35 -15.77 -22.56 179.16 111.65 119.26

0.00 13.55 0.00 0.00 189.41 119.15 128.76

0.00 4.74 0.00 0.00 66.29 41.70 45.06

0.00 2.37 0.00 0.00 33.15 20.85 22.53

9.79 3.91 2.51 1.01 0.40 13.42 13.71

9.79 6.29 2.51 1.01 33.55 34.27 36.24

-14.68 -3.50 -3.77 -1.51 32.54 0.72 1.97

14.68 8.24 3.77 1.51 33.75 40.98 43.10

0.00 8.81 0.00 0.00 123.12 77.45 83.69

14.68 17.05 3.77 1.51 156.87 118.43 126.79

0.85 0.95 0.21 0.09 8.79 6.85 7.10

I = 0.35

IS = 50 mm

PF = 0.05

30 31 31 30 31 30 31

Debit Bulanan Metoda Dr. FJ MockTahun 2010 (awal)

Juni Juli Ags Sept Okt Nov Des

10 11 12 13 14 15 16 17 18

Page 63: Attachment

0.00 32.00 17.00 0.00 23.00 112.00 122.00

7.00 3.00 2.00 0.00 3.00 9.00 15.00

117.80 120.30 125.40 112.80 120.80 123.40 133.70

30.00 40.00 50.00 60.00 70.00 60.00 50.00

0.23 0.36 0.47 0.60 0.63 0.42 0.26

27.09 43.46 58.65 67.68 76.38 51.83 34.50

90.71 76.84 66.75 45.12 44.42 71.57 99.20

-90.71 -44.84 -49.75 -45.12 -21.42 40.43 22.80

0 1.6 0.85 0 1.15 5.6 6.1

-90.71 -46.44 -50.60 -45.12 -22.57 34.83 16.70

-90.71 -46.44 -50.60 -45.12 -22.57 34.83 16.70

0.00 0.00 0.00 0.00 0.00 40.43 22.80

0.00 0.00 0.00 0.00 0.00 14.15 7.98

0.00 0.00 0.00 0.00 0.00 7.07 3.99

8.80 3.52 1.41 0.56 0.23 0.09 2.87

8.80 3.52 1.41 0.56 0.23 7.17 6.86

-13.20 -5.28 -2.11 -0.84 -0.34 6.94 -0.31

13.20 5.28 2.11 0.84 0.34 7.21 8.29

0.00 0.00 0.00 0.00 0.00 26.28 14.82

13.20 5.28 2.11 0.84 0.34 33.49 23.11

0.76 0.30 0.12 0.05 0.02 1.94 1.29

I = 0.35

IS = 50 mm

PF = 0.05

30 31 31 30 31 30 31

Debit Bulanan Metoda Dr. FJ MockTahun 2011 (awal)

Juni Juli Ags Sept Okt Nov Des

10 11 12 13 14 15 16 17 18

0.00 0.00 0.00 102.00 19.00 58.00 284.00

5.00 1.00 0.00 0.00 2.00 7.00 10.00

117.80 120.30 125.40 112.80 120.80 123.40 133.70

Page 64: Attachment

30.00 40.00 50.00 60.00 70.00 70.00 60.00

0.25 0.39 0.50 0.60 0.65 0.54 0.41

29.45 46.57 62.70 67.68 79.10 66.22 54.34

88.35 73.73 62.70 45.12 41.70 57.18 79.36

-88.35 -73.73 -62.70 56.88 -22.70 0.82 204.64

0 0 0 5.1 0.95 2.9 14.2

-88.35 -73.73 -62.70 51.78 -23.65 -2.08 190.44

-88.35 -73.73 -62.70 51.78 -23.65 -2.08 190.44

0.00 0.00 0.00 56.88 0.00 0.82 204.64

0.00 0.00 0.00 19.91 0.00 0.29 71.62

0.00 0.00 0.00 9.95 0.00 0.14 35.81

15.02 6.01 2.40 0.96 4.37 1.75 0.76

15.02 6.01 2.40 10.92 4.37 1.89 36.57

-22.53 -9.01 -3.60 8.51 -6.55 -2.48 34.68

22.53 9.01 3.60 11.40 6.55 2.76 36.95

0.00 0.00 0.00 36.97 0.00 0.54 133.02

22.53 9.01 3.60 48.37 6.55 3.30 169.96

1.30 0.50 0.20 2.80 0.37 0.19 9.52

I = 0.35

IS = 50 mm

PF = 0.05

30 31 31 30 31 30 31

Debit Bulanan Metoda Dr. FJ MockTahun 2012 (awal)

Juni Juli Ags Sept Okt Nov Des

10 11 12 13 14 15 16 17 18

102.00 0.00 19.00 250.00 17.00 280.00 25.00

3.00 2.00 1.00 0.00 0.00 6.00 9.00

117.80 120.30 125.40 112.80 120.80 123.40 133.70

40.00 50.00 60.00 70.00 80.00 80.00 70.00

0.36 0.47 0.58 0.70 0.80 0.64 0.50

42.41 56.27 72.81 78.96 96.64 78.98 66.42

75.39 64.03 52.59 33.84 24.16 44.42 67.28

Page 65: Attachment

26.61 -64.03 -33.59 216.16 -7.16 235.58 -42.28

5.1 0 0.95 12.5 0.85 14 1.25

21.51 -64.03 -34.54 203.66 -8.01 221.58 -43.53

21.51 -64.03 -34.54 203.66 -8.01 221.58 -43.53

26.61 0.00 0.00 216.16 0.00 235.58 0.00

9.31 0.00 0.00 75.66 0.00 82.45 0.00

4.66 0.00 0.00 37.83 0.00 41.23 0.00

8.27 5.17 2.07 0.83 15.46 6.18 18.96

12.93 5.17 2.07 38.66 15.46 47.41 18.96

-7.75 -7.76 -3.10 36.59 -23.19 31.95 -28.45

17.06 7.76 3.10 39.07 23.19 50.50 28.45

17.30 0.00 0.00 140.50 0.00 153.12 0.00

34.35 7.76 3.10 179.57 23.19 203.63 28.45

1.99 0.43 0.17 10.39 1.30 11.78 1.59

I = 0.35

IS = 50 mm

PF = 0.05

30 31 31 30 31 30 31

Page 66: Attachment

Debit Bulanan Metoda Dr. FJ MockTahun 2008 (awal)

19 20 21 22 23 24 25 26 27

Debit Bulanan Metoda Dr. FJ MockTahun 2009 (awal)

Page 67: Attachment

19 20 21 22 23 24 25 26 27

Debit Bulanan Metoda Dr. FJ MockTahun 2010 (awal)

19 20 21 22 23 24 25 26 27

Page 68: Attachment

Debit Bulanan Metoda Dr. FJ MockTahun 2011 (awal)

19 20 21 22 23 24 25 26 27

Page 69: Attachment

Debit Bulanan Metoda Dr. FJ MockTahun 2012 (awal)

19 20 21 22 23 24 25 26 27

Page 70: Attachment
Page 71: Attachment

Debit Bulanan Metoda Dr. FJ MockTahun 2008 (awal)

28

Debit Bulanan Metoda Dr. FJ MockTahun 2009 (awal)

Page 72: Attachment

28

Debit Bulanan Metoda Dr. FJ MockTahun 2010 (awal)

28

Page 73: Attachment

Debit Bulanan Metoda Dr. FJ MockTahun 2011 (awal)

28

Page 74: Attachment

Debit Bulanan Metoda Dr. FJ MockTahun 2012 (awal)

28

Page 75: Attachment
Page 76: Attachment

DEBIT BULANAN METODA MOCK

BulanJan Feb Mar Apr Mei Jun Jul

Tahun2008 5.89 8.60 16.66 18.48 2.96 1.22 0.472009 2.40 5.97 10.23 11.68 2.47 0.85 0.952010 8.99 17.33 2.51 12.78 1.85 0.76 0.302011 15.95 15.03 9.00 9.50 6.35 1.30 0.502012 10.59 4.32 14.61 9.35 1.74 1.99 0.43Rata2 8.76 10.25 10.60 12.36 3.07 1.23 0.53

Sd 5.09 5.68 5.50 3.72 1.90 0.49 0.25Q80 rumus 4.47 5.46 5.97 9.23 1.47 0.82 0.32

Q80 real

DesNovOktSepAgsJulJunMeiAprMarFebJan

-2.000.002.004.006.008.00

10.00

DEBIT ANDALAN MOCK

Q80 (rumus)

BULAN

DEBIT

Page 77: Attachment

DEBIT BULANAN METODA MOCK

Ags Sep Okt Nov Des

0.19 1.39 0.19 4.75 4.000.21 0.09 8.79 6.85 7.100.12 0.05 0.02 1.94 1.290.20 2.80 0.37 0.19 9.520.17 10.39 1.30 11.78 1.590.18 2.94 2.13 5.10 4.700.04 4.31 3.75 4.53 3.560.15 -0.69 -1.03 1.29 1.70

DesNovOktSepAgsJulJunMeiAprMarFebJan

-2.000.002.004.006.008.00

10.00

DEBIT ANDALAN MOCK

Q80 (rumus)

BULAN

DEBIT

Page 78: Attachment

Berdasarkan Perhitungan Debit Metode Dr. FJ. Mock

ProbabilitasJan Feb Maret April Mei Juni Juli

1 2 1 2 1

1 16.67 5.89 8.60 16.66 18.48 2.96 1.22 0.472 33.33 2.40 5.97 10.23 11.68 2.47 0.85 0.953 50.00 8.99 17.33 2.51 12.78 1.85 0.76 0.304 66.67 15.95 15.03 9.00 9.50 6.35 1.30 0.505 83.33 10.59 4.32 14.61 9.35 1.74 1.99 0.43

8.763 10.249 10.603 12.357 3.072 1.225 0.533

Sd 5.092 5.682 5.499 3.718 1.897 0.485 0.249

4.47 5.46 5.97 9.23 1.47 0.82 0.32

10.59 5.96 11.24 11.87 8.80 11.09 13.23

Rata2

Q80 (rumus)

Q80 (real)

C8
User: REKAP YANG BELUM DIURUTKAN
Page 79: Attachment

Berdasarkan Perhitungan Debit Metode Dr. FJ. Mock

Agustus Sept Oktober Nov Des

2 1 2 1 2

0.19 1.39 0.19 4.75 4.000.21 0.09 8.79 6.85 7.100.12 0.05 0.02 1.94 1.290.20 2.80 0.37 0.19 9.520.17 10.39 1.30 11.78 1.59

0.179 2.943 2.132 5.103 4.702

0.037 4.314 3.752 4.527 3.561

0.15 -0.69 -1.03 1.29 1.70

9.05 0.00 0.00 3.07 2.25

Debit Andalan Metode Basic Month

Page 80: Attachment

Berdasarkan Perhitungan Debit Metode Dr. FJ. MockBasic Month