  • ORIGINAL DRAWINGIN COLOUR

    UNTUK PERMOHONAN IMB

    Project No.

    Prepared for

    ByBeca

    Drawing No. Rev.

    Docu

    ment

    No.

    Drawing Plotted:

    D:\R

    evit\R

    ichs\2

    8525

    51-S

    E-RI

    CHS-

    2016

    - IMB

    _MIS

    1.rvt

    14/9/2015 3:40:55 PM

    STRUKTUR2820056

    PROYEK RICHS JAKARTA

    UNTUK PERMOHONAN IMB

    14 SEPTEMBER 2015

    A2820056-SE-0000

    STRUCTURAL DRAWING LIST

    No.GAMBAR Rev JUDUL GAMBARSE-0000 A HALAMAN MUKASE-0001 A BNG KANTOR- DENAH DAN DETIL PONDASISE-0002 A BNG KANTOR - DENAH LANTAI DAN DENAH ATAPSE-0003 A BANGUNAN KANTOR - POTONGAN DAN DETILSE-0101 A BANGUNAN PRODUKSI/GUDANG DENAH DAN DETIL PONDASISE-0102 A BANGUNAN PRODUKSI/GUDANG DENAH LANTAI DASARSE-0103 A BANGUNAN PRODUKSI/GUDANG DENAH RANGKA TAPSE-0111 A BANGUNAN PRODUKSI/GUDANG - POTONGAN LEMBAR 1SE-0112 A BANGUNAN PRODUKSI/GUDANG - POTONGAN LEMBAR 2SE-0121 A BANGUNAN PRODUKSI/GUDANG - DETIL LEMBAR 1SE-0122 A BANGUNAN PRODUKSI/GUDANG - DETIL LEMBAR 2SE-0201 A BANGUNAN UTILITY - DENAH DAN DETIL PONDASISE-0202 A BANGUNAN UTILITY - DENAH LANTAI DAN ATAPSE-0203 A BANGUNAN UTILITY - POTONGAN DAN DETIL

  • O9

    O8

    O7

    O6

    O5

    O4

    O3

    O2

    O1

    OA OB OC WA

    W2

    W3

    W4

    W5

    W6

    W7

    W8

    U2

    U1

    4783

    4783

    4783

    5100

    5100

    5100

    5575

    5575

    4080

    0

    5570 5570 1000

    12140

    PC4

    PC4

    PC4

    PC4

    PC4

    PC4

    PC4

    PC4

    PC4

    PC4

    PC4

    PC4

    PC4

    PC4

    PC4

    PC4

    PC4

    PC4

    PC6A

    PC4

    PC4

    PC4

    P6B

    PC4

    PC4

    PC6A

    P6C

    TEMBOK PENAHANT = 150 THK

    P2A

    P2A

    P2A

    TITIK POINT KOLOM

    TYP

    350

    TYP

    350

    A

    TIANG PANCANG PRECAST PRESTLILECONCRETE 350x350DIPANCANG SAMPAI KEDALAMANL=9.0m /TANAH KERAS DARIMUKA TANAH ASLI

    T1

    B1

    B2T2

    T3

    HEL-2.200 TOP OF PILE CAP(TYP.)

    TYP350

    TYP350

    1700

    OF COLUMN

    150

    450

    600

    1000

    600

    2200

    B1B2

    T2T1

    SLAB BETON

    BALOK SLOOF

    LANTAI KERJAT = 50mm

    PASIR URUGDIPADATKAN

    KOLOM BETON

    TANAH ASLILEVEL MUKA TANAH URUG

    LANTAI DASARLEVEL

    OF COLUMNSLAB BETONLANTAI KERJAT = 50mm

    PASIR URUGDIPADATKAN

    TEMBOK PENAHANTANAHT = 150 THKTULANGAN D16-150

    1200

    1600

    600

    600

    1000

    600

    BALOK SLOOF

    BALOK SLOOF400x600

    300

    TANAH URUG

    TANAH

    LEVEL P - PONDASIRL -2.200

    400

    GAMBAR INI DISAJIKAN UNTUK DIBACA BERSAMA-SAMA DENGAN GAMBAR-GAMBAR ARSITEKTUR.

    UKURAN-UKURAN JARAK, KETINGGIAN DAN ASBANGUNAN DITENTUKAN BERSAMA-SAMADENGAN GAMBAR-GAMBAR ARSITEKTUR.

    MUTU BETON :PELAT LANTAI & BALOK : Fc' = 30 MPaKOLOM : Fc' = 30 MPaPILE CAP : Fc' = 25 MPaTEMBOK PENAHAN : Fc' = 30 MPa

    MUTU TULANGAN < 10mm BJTP24 : Fy = 240 MPaD > 10mm BJTD40 : Fy = 400 MPa

    UNTUK PERMOHONAN IMBDO NOT SCALE

    Drawing Plotted:

    IF IN DOUBT ASK.

    Docu

    ment

    No.

    Discipline

    Drawing No. Rev.

    Title

    Project

    Client

    Drawing Originator

    OriginalScale (A1)

    ReducedScale (A3)

    Design

    Drawn

    Dsg Verifier

    Dwg Check

    No. Revision DateAppdChkBy

    PROJECT NORTH

    TRUE NORTH102.39

    RICH PRODUCTS, CORPJL. UTAMA MODERN INDUSTRIBLOCK BA NO.5KAWASAN MODERN INDUSTRI,CIKANDE, SERANG, BANTEN

    KETERANGAN

    14/9/2015 3:48:26 PM

    D:\R

    evit\R

    ichs\2

    8525

    51-S

    E-RI

    CHS-

    2016

    -IM

    B_MI

    S1.rv

    t

    As indicated

    BNG KANTOR- DENAH DAN DETILPONDASI

    A

    STRUKTUR

    2820056-SE-0001

    PROYEK RICHS JAKARTA

    JO3 SEP'2015STNYHN

    HP1

    SEP'2015SEP'2015

    SEP'2015

    - 1 : 200A DENAH PONDASI PILE CAP

    1 : 20PC4 SKEMATIK DETAIL PEMBESIAN PILE CAP

    1 : 252 POTONGAN PILE CAP PC4

    1 : 251 SKEMATIK DETAIL TEMBOK PENAHAN TANAH

    UNTUK PERMOHONAN IMB 14.09.2015A

  • T2

    T1

    O9

    O8

    O7

    O6

    O5

    O4

    O3

    O2

    O1

    OA OB OC WA

    W2

    W3

    W4

    W5

    W7

    W8

    U2

    U1

    TDTA TB TC UA

    5570 5570 1000

    12140

    4783

    4783

    4783

    5100

    5100

    5100

    5575

    5575

    4080

    0

    B1B1

    B1B1

    B1B1

    B1B1

    B1 B1

    B1B1

    B1B1

    B1B1

    B1B1

    B1B1

    B1B1

    B1B1

    B1B1

    B1 B1

    B1 B1

    B1 B1

    B1B1

    B1 B1

    B1 B1

    B1B1

    B1 B1

    C2

    C2C2

    C2 C2

    C2

    C2C2

    C2

    C2 C2

    C2

    C2 C2

    C2

    C2C2C2

    C2 C2

    C2

    C2 C2

    C2

    C2 C2 C2

    SE-00031

    SE-00033

    SE-00032

    PLAT BETONT=150mmTULANGAN D10-200 ATAS BAWAH

    B2B2

    B2B2

    B2B2

    B2B2

    B2B2

    B2B2

    B2B2

    B2B2

    B2

    B2

    B2

    B2

    B2

    B2

    B2

    B2 B2

    B2

    B2B2 B2

    B2B2 B2

    B2B2 B2

    B2B2 B2

    B2B2 B2

    B2B2 B2

    B2B2 B2

    B2

    B6B6

    B6B6

    B6B6

    B6B6

    T2

    T1

    O9

    O8

    O7

    O6

    O5

    O4

    O3

    O2

    O1

    OA OB OC WA

    W2

    W3

    W4

    W5

    W6

    W7

    W8

    U2

    U1

    TDTA TB TC UA

    5570 5570 100012140

    4783

    4783

    4783

    5100

    5100

    5100

    5575

    5575

    4080

    0

    B1B1

    B1B1

    B1B1

    B1B1

    B1 B1

    B1 B1

    B1B1

    B1B1

    B1B1

    B1B1

    B1B1

    B1B1

    B1B1

    B1B1

    B1 B1

    B1 B1

    B1 B1

    B1B1

    B1 B1

    B1 B1

    B1 B1

    SE-00031

    SE-00033

    SE-00032

    PLAT BETONT=150mmTULANGAN D10-200 ATAS BAWAH

    B2 B2

    B2B2 B2

    B2B2 B2

    B2B2 B2

    B2B2 B2

    B2B2 B2

    B2B2 B2

    B2B2 B2

    B2

    B2 B2

    B2B2 B2

    B2B2 B2

    B2B2 B2

    B2B2 B2

    B2B2 B2

    B2B2 B2

    B2B2 B2

    B2

    ? - [?]

    B6B6

    B6B6

    B6B6

    B6B6

    T2

    T1

    O9

    O8

    O7

    O6

    O5

    O4

    O3

    O2

    O1

    OA OB OC WA

    W2

    W3

    W4

    W5

    W6

    W7

    W8

    U2

    U1

    TDTA TB TC UA

    5570 5570 1000

    12140

    4783

    4783

    4783

    5100

    5100

    5100

    5575

    5575

    4080

    0

    C2 C2

    C2

    C2 C2

    C2

    C2 C2

    C2

    C2 C2

    C2

    C2C2C2

    C2 C2

    C2

    C2 C2

    C2

    C2C2C2

    C2 C2

    C2

    B1B1

    B1B1

    B1B1

    B1B1

    B1 B1

    B1B1

    B1B1

    B1B1

    B1

    B1 B1

    B1 B1

    B1 B1

    B1 B1

    B1 B1

    B1B1

    B1B1

    B1 B1

    B1 B1B1

    B1B1

    B1B1

    B1B1

    PLAT BETONT=150mmTULANGAN D10-200 ATAS BAWAH

    SE-00031

    SE-00033

    SE-00032

    B6B6

    B6B6

    B6B6

    B6B6B2

    B2B2

    B2B2

    B2B2

    B2B2

    B2B2

    B2B2

    B2B2

    B2B2

    B2

    B2

    B2

    B2

    B2

    B2

    B2

    B2 B2

    B2B2 B2

    B2B2 B2

    B2B2 B2

    B2B2 B2

    B2B2 B2

    B2B2 B2

    B2B2

    B2

    B2

    GAMBAR INI DISAJIKAN UNTUK DIBACA BERSAMA-SAMA DENGAN GAMBAR-GAMBAR ARSITEKTUR.

    UKURAN-UKURAN JARAK, KETINGGIAN DAN ASBANGUNAN DITENTUKAN BERSAMA-SAMADENGAN GAMBAR-GAMBAR ARSITEKTUR.

    MUTU BETON :PELAT LANTAI & BALOK : Fc' = 30 MPaKOLOM : Fc' = 30 MPaPILE CAP : Fc' = 25 MPaTEMBOK PENAHAN : Fc' = 30 MPa

    MUTU TULANGAN < 10mm BJTP24 : Fy = 240 MPaD > 10mm BJTD40 : Fy = 400 MPa

    UNTUK PERMOHONAN IMBDO NOT SCALE

    Drawing Plotted:

    IF IN DOUBT ASK.

    Docu

    ment

    No.

    Discipline

    Drawing No. Rev.

    Title

    Project

    Client

    Drawing Originator

    OriginalScale (A1)

    ReducedScale (A3)

    Design

    Drawn

    Dsg Verifier

    Dwg Check

    No. Revision DateAppdChkBy

    PROJECT NORTH

    TRUE NORTH102.39

    RICH PRODUCTS, CORPJL. UTAMA MODERN INDUSTRIBLOCK BA NO.5KAWASAN MODERN INDUSTRI,CIKANDE, SERANG, BANTEN

    KETERANGAN

    14/9/2015 3:41:28 PM

    D:\R

    evit\R

    ichs\2

    8525

    51-S

    E-RI

    CHS-

    2016

    -IM

    B_MI

    S1.rv

    t

    As indicated

    BNG KANTOR - DENAH LANTAIDAN DENAH ATAP

    A

    STRUKTUR

    2820056-SE-0002

    PROYEK RICHS JAKARTA

    JO3 SEP'2015STNYHN

    HP1

    SEP'2015SEP'2015

    SEP'2015

    - 1 : 200B DENAH LANTAI 1

    - 1 : 200C DENAH ATAP DAK

    - 1 : 200A DENAH LANTAI DASAR

    UNTUK PERMOHONAN IMB 14.09.2015A

  • LEVEL 0 - LT DASARRL 0.000 m

    LEVEL 1 - LT KANTORRL 4.200 m

    LEVEL 3 - ATAP KANTORRL 8.400 m

    LEVEL P - PONDASIRL -2.200 m

    OA OB OC

    WA

    PC4 PC4 P6C

    B1 B1

    B1B1

    B1 B1

    C2

    C2 C2

    C2 C2

    C2 4200

    4200

    220012

    00

    LEVEL 0 - LT DASARRL 0.000 m

    LEVEL 1 - LT KANTORRL 4.200 m

    LEVEL 3 - ATAP KANTORRL 8.400 m

    LEVEL P - PONDASIRL -2.200 m

    OA OB OC

    WA

    B1 B1

    B1B1

    B1 B1

    PC4 PC4 PC4

    C2 C2 C2

    C2 C2 C2

    A

    LEVEL 0 - LT DASARRL 0.000 m

    LEVEL 1 - LT KANTORRL 4.200 m

    LEVEL 3 - ATAP KANTORRL 8.400 m

    LEVEL P - PONDASIRL -2.200 m

    O9 O8 O7 O6 O5 O4 O3 O2 O1

    U1

    C2

    C2

    C2

    C2B1

    B1

    B1 B1

    B1

    B1 B1

    B1

    B1 B1

    B1

    B1

    B1

    B1 B1

    B1

    B1 B1

    B1

    B1 B1

    B1

    B1B1C2

    C2

    C2

    C2 C2

    C2

    C2 C2 C2 C2

    C2 C2 C2 C2

    PC4 PC4 PC4 PC4 PC4 PC4 PC4 PC4 PC4

    4200

    4200

    220012

    00

    TEMBOK PENAHANTANAHT = 150 THK

    LEVEL 0 - LT DASARRL 0.000 m

    LEVEL 1 - LT KANTORRL 4.200 m

    LEVEL 3 - ATAP KANTORRL 8.400 m

    OA

    BALOKB1300x600

    BALOKB2250x400

    BALOKB6200x400

    SENGKANG

    BALOK SLOOF400x600

    PINGGIR

    5D19 3D19 2D10

    TENGAH

    D10-1503D19 5D19 2D10

    D10-200

    JENIS TULANGAN

    3D16 3D16 2D10D10-150

    3D16 3D16 2D10D10-200

    2D16 2D16 2D10D10-150 D10-200

    ATAS BAWAH TENGAH5D19 5D19 2D10

    D10-150

    2D16 2D16 2D10

    5D19 5D19 2D10D10-150

    600

    400 400

    600

    400

    200

    400

    200

    600

    600

    300 300

    250

    400

    250

    400

    ATAS BAWAH TENGAH

    JENIS TULANGANATAS BAWAH TENGAH ATAS BAWAH TENGAH

    JENIS TULANGANATAS BAWAH TENGAH ATAS BAWAH TENGAH

    JENIS TULANGANATAS BAWAH TENGAH ATAS BAWAH TENGAH

    SENGKANG

    SENGKANG

    SENGKANG

    AREA

    LEVEL PPONDASIRL -2.200 m

    GRID

    LEVEL 0LT DASARRL 0.000 m

    LEVEL 1LT KANTORRL 4.200 m

    JENIS TULANGAN

    SENGKANG

    LEVEL 3ATAP KANTORRL 8400 m

    PINGGIR TENGAH SAMBUNGAN

    20-D22

    SEMUA GRID

    D10-150 D10-150 D10-150

    500

    500

    20-D22

    D10-150 D10-150 D10-150

    500

    500

    20-D22

    D10-150 D10-150 D10-150

    500

    500

    20-D22

    D10-150 D10-150 D10-150

    500

    500

    JENIS TULANGAN

    SENGKANGPINGGIR TENGAH SAMBUNGAN

    JENIS TULANGAN

    SENGKANGPINGGIR TENGAH SAMBUNGAN

    JENIS TULANGAN

    SENGKANGPINGGIR TENGAH SAMBUNGAN

    MUTU BETON :PELAT LANTAI & BALOK : Fc' = 30 MPaKOLOM : Fc' = 30 MPaPILE CAP : Fc' = 25 MPaTEMBOK PENAHAN : Fc' = 30 MPa

    MUTU TULANGAN < 10mm BJTP24 : Fy = 240 MPaD > 10mm BJTD40 : Fy = 400 MPa

    UNTUK PERMOHONAN IMBDO NOT SCALE

    Drawing Plotted:

    IF IN DOUBT ASK.

    Docu

    ment

    No.

    Discipline

    Drawing No. Rev.

    Title

    Project

    Client

    Drawing Originator

    OriginalScale (A1)

    ReducedScale (A3)

    Design

    Drawn

    Dsg Verifier

    Dwg Check

    No. Revision DateAppdChkBy

    RICH PRODUCTS, CORPJL. UTAMA MODERN INDUSTRIBLOCK BA NO.5KAWASAN MODERN INDUSTRI,CIKANDE, SERANG, BANTEN

    KETERANGAN

    14/9/2015 3:41:44 PM

    D:\R

    evit\R

    ichs\2

    8525

    51-S

    E-RI

    CHS-

    2016

    -IM

    B_MI

    S1.rv

    t

    As indicated

    BANGUNAN KANTOR - POTONGANDAN DETIL

    A

    STRUKTUR

    2820056-SE-0003

    PROYEK RICHS JAKARTA

    JO3 SEP'2015STNYHN

    HP1

    SEP'2015SEP'2015

    SEP'2015

    SE-0002 1 : 2002 POTONGAN

    SE-0002 1 : 2003 POTONGANSE-0002 1 : 200

    1 POTONGAN

    - 1 : 50A PENJELAS

    1 : 20B TABEL PENJELAS BALOK BETON

    1 : 20C TABEL PENJELAS KOLOM BETON

    UNTUK PERMOHONAN IMB 14.09.2015A

  • O9

    W1

    O1

    O4

    O2

    O3

    O7

    O8

    O5

    O6

    T1

    O9

    O8

    O7

    O6

    O5

    O4

    O3

    O2

    O1

    OC WA WB WC WD WE WF WH WI WJ WK WL WM

    W1

    W2

    W3

    W4

    W5

    W6

    W7

    W8

    UKUJUIUHUGUB UC UD UE UFUA

    1000 7000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 626074260

    6442

    6442

    6442

    6442

    6442

    6442

    3865

    0

    P6C

    P6B

    P2A

    P2A

    PC6A

    P2B P2BP2B

    P2B P2B P2B P2B P2B P2B P2B P2B

    P2A

    P2A

    P2A

    P2A

    P2A

    P2B P2B P2B P2BP2B P2BP2BP2BP2BP2BP2BP2BP2B

    P1 P1 P1 P1 P1 P1 P1P1

    P1

    P1

    P1

    P1

    P1

    P1

    P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1

    3000

    3000

    3000

    3000

    3000

    2500

    1825

    1825

    2500

    3000

    3000

    3000

    3000

    3000

    SEMUA PARIMETER PILE CAPEL-2.200 TOP OF PILE CAP(TYP.)

    SEMUA PARIMETER PILE CAPEL-2.200 TOP OF PILE CAP(TYP.)

    PILE CAP P1LIHAT DI POTONGAN 1SE-0122(TYP)

    PILE CAP P1LIHAT DI POTONGAN 2SE-0122(TYP)

    AREA 2( P1 EL -0.375 TOP OF PILE CAP)AREA 1( P1 EL 0.000 TOP OF PILE CAP)

    SE-01011 SE-0101

    2

    PILE CAP P1LIHAT DI POTONGAN 3SE-0122(TYP)

    WG

    PILE CAP P1LIHAT DI POTONGAN 2SE-0122(TYP)

    P1

    P1P2B P1 P2

    BP1 P2

    BP1 P2

    BP1 P2B

    P1

    P1

    P2B

    P1

    P2A

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5 B5 B5 B5 B5 B5 B5 B5

    B5 B5 B5 B5 B5 B5 B5 B5

    B5 B5 B5 B5 B5 B5 B5 B5

    B5 B5 B5 B5 B5 B5 B5 B5

    B5 B5 B5 B5 B5 B5 B5 B5

    B5 B5 B5 B5 B5 B5 B5 B5

    B5 B5 B5 B5 B5 B5 B5 B5

    B5 B5 B5 B5 B5 B5 B5 B5

    B5 B5 B5 B5 B5 B5 B5 B5

    B5 B5 B5 B5 B5 B5 B5 B5

    B5 B5 B5 B5 B5 B5 B5 B5

    B5 B5 B5 B5 B5 B5 B5 B5

    B5 B5 B5 B5 B5 B5 B5 B5

    B5 B5 B5 B5 B5 B5 B5 B5

    SE-01021

    LEVEL 0 - LT DASARRL 0.000 m

    LEVEL P - PONDASIRL -2.200 m

    W2

    1200

    1000

    MUKA TANAH ASLI

    200

    800

    400

    600

    300

    PILE CAP P1EL-0.00 TOPOF PILE CAP

    TIANG PANCANGPRECAST PRESTLILECONCRETE 350x350DIPANCANG SAMPAIKEDALAMANL=9.0m /TANAH KERASDARI MUKA TANAH ASLI

    KOLOM BETON

    BALOK SLOOF

    PARIMETER PILE CAPP2A EL-2.200 TOP OF PILE CAP

    KOLOM BAJALIHAT GAMBAR BAJA

    LEVEL 0 - LT DASARRL 0.000 m

    LEVEL P - PONDASIRL -2.200 m

    W2OF COLUMN

    KOLOM BETON

    375

    200

    800

    20mm GAPCOMPRESSIBLE FILLER BOARD& JOINT SEALANT

    BALOK SLOOF

    150 THK SLABBETON ATAS

    200 INSULATION

    200 BETONBAWAH SLAB

    GAMBAR INI DISAJIKAN UNTUK DIBACA BERSAMA-SAMA DENGAN GAMBAR-GAMBAR ARSITEKTUR.

    UKURAN-UKURAN JARAK, KETINGGIAN DAN ASBANGUNAN DITENTUKAN BERSAMA-SAMADENGAN GAMBAR-GAMBAR ARSITEKTUR.

    MUTU BETON :PELAT LANTAI & BALOK : Fc' = 30 MPaKOLOM : Fc' = 30 MPaPILE CAP : Fc' = 25 MPaTEMBOK PENAHAN : Fc' = 30 MPa

    MUTU TULANGAN < 10mm BJTP24 : Fy = 240 MPaD > 10mm BJTD40 : Fy = 400 MPa

    UNTUK PERMOHONAN IMBDO NOT SCALE

    Drawing Plotted:

    IF IN DOUBT ASK.

    Docu

    ment

    No.

    Discipline

    Drawing No. Rev.

    Title

    Project

    Client

    Drawing Originator

    OriginalScale (A1)

    ReducedScale (A3)

    Design

    Drawn

    Dsg Verifier

    Dwg Check

    No. Revision DateAppdChkBy

    PROJECT NORTH

    TRUE NORTH102.39

    RICH PRODUCTS, CORPJL. UTAMA MODERN INDUSTRIBLOCK BA NO.5KAWASAN MODERN INDUSTRI,CIKANDE, SERANG, BANTEN

    KETERANGAN

    14/9/2015 3:42:00 PM

    D:\R

    evit\R

    ichs\2

    8525

    51-S

    E-RI

    CHS-

    2016

    -IM

    B_MI

    S1.rv

    t

    As indicated

    BANGUNAN PRODUKSI/GUDANGDENAH DAN DETIL PONDASI

    A

    STRUKTUR

    2820056-SE-0101

    PROYEK RICHS JAKARTA

    JO3 SEP'2015STNYHN

    HP1

    SEP'2015SEP'2015

    SEP'2015- 1 : 200A DENAH PONDASI

    - 1 : 251 SECTION

    - 1 : 252 SECTION

    PENJELAS PILE CAP LIHAT PADA GAMBAR SE-0122

    UNTUK PERMOHONAN IMB 14.09.2015A

  • T1

    O9

    O8

    O7

    O6

    O5

    O4

    O3

    O2

    O1

    WA WB WC WD WE WF WH WI WJ WK WL WM

    W1

    W2

    W3

    W4

    W5

    W6

    W7

    W8

    UKUJUIUHUGTD UB UC UD UE UFUA TE

    SE-01011 SE-0101

    2

    SE-01113

    SE-01111

    SE-01112

    SE-01114

    SE-01125

    SE-01126

    SE-01127

    WG

    B5 B5 B5 B5B5B5B5B5B5B5B5B5

    B5B5

    B5B5

    B5B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5

    B5 B5 B5 B5 B5 B5 B5

    B5B5

    B5B5

    B5B5

    B5

    B5

    B5 B5 B5 B5 B5 B5B5

    B5 B5 B5 B5 B5 B5B5

    B5 B5 B5 B5 B5 B5B5

    B5

    B5 B5 B5 B5 B5 B5B5

    B5

    B5 B5 B5 B5 B5 B5B5

    B5

    B5 B5 B5 B5 B5 B5B5

    B5

    B5 B5 B5 B5 B5 B5B5

    B5

    B5 B5 B5 B5 B5 B5B5

    B5

    B5 B5 B5 B5 B5 B5B5

    B5

    B5 B5 B5 B5 B5 B5B5

    B5

    B5 B5 B5 B5 B5 B5B5

    B5

    B5 B5 B5 B5 B5 B5B5

    B5

    B5 B5 B5 B5 B5 B5B5

    B5B5

    B5

    B5 B5B5B5B5B5B5B5B5B5B5B5

    B5B5B5B5

    B5

    C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1

    C4C4C4C4C4

    C3

    C3

    C3

    C3

    C3

    C1C1C1C1C1C1C1C1C1C1C1C1C1

    C3

    C3

    C3

    C3

    C3

    1825

    2500

    3000

    3000

    3000

    3000

    3000

    3000

    3000

    3000

    3000

    3000

    2500

    1825

    3865

    064

    4264

    4264

    4264

    4264

    4264

    42

    7000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6260

    C4

    SE-01021

    GAMBAR INI DISAJIKAN UNTUK DIBACA BERSAMA-SAMA DENGAN GAMBAR-GAMBAR ARSITEKTUR.

    UKURAN-UKURAN JARAK, KETINGGIAN DAN ASBANGUNAN DITENTUKAN BERSAMA-SAMADENGAN GAMBAR-GAMBAR ARSITEKTUR.

    MUTU BETON :PELAT LANTAI & BALOK : Fc' = 30 MPaKOLOM : Fc' = 30 MPaPILE CAP : Fc' = 25 MPaTEMBOK PENAHAN : Fc' = 30 MPa

    MUTU TULANGAN < 10mm BJTP24 : Fy = 240 MPaD > 10mm BJTD40 : Fy = 400 MPa

    LEVEL 0 - LT DASARRL 0.000 m

    OC WA

    350GAP20

    DI ISI DENGAN COMPRESSIBLEFILLER BOARD &JOINT SEALANT

    200

    300

    BALOK SLOOF BAGUNAN PRODUKSI /GUDANG350x500

    B1 (OFFICE)300x600

    B6 (OFFICE)200x400

    UNTUK PERMOHONAN IMBDO NOT SCALE

    Drawing Plotted:

    IF IN DOUBT ASK.

    Docu

    ment

    No.

    Discipline

    Drawing No. Rev.

    Title

    Project

    Client

    Drawing Originator

    OriginalScale (A1)

    ReducedScale (A3)

    Design

    Drawn

    Dsg Verifier

    Dwg Check

    No. Revision DateAppdChkBy

    PROJECT NORTH

    TRUE NORTH102.39

    RICH PRODUCTS, CORPJL. UTAMA MODERN INDUSTRIBLOCK BA NO.5KAWASAN MODERN INDUSTRI,CIKANDE, SERANG, BANTEN

    KETERANGAN

    14/9/2015 3:42:30 PM

    D:\R

    evit\R

    ichs\2

    8525

    51-S

    E-RI

    CHS-

    2016

    -IM

    B_MI

    S1.rv

    t

    As indicated

    BANGUNAN PRODUKSI/GUDANGDENAH LANTAI DASAR

    A

    STRUKTUR

    2820056-SE-0102

    PROYEK RICHS JAKARTA

    JO3 SEP'2015STNYHN

    HP1

    SEP'2015SEP'2015

    SEP'2015

    - 1 : 200A DENAH LANTAI DASAR

    UNTUK PERMOHONAN IMB 14.09.2015A

    NTS-1 SAMBUNGAN ANTARA LANTAI ANTARA BANGUNAN PRODUKSI & KANTOR

  • WA WB WC WD WE WF WH WI WJ WK WL WM

    W2

    W3

    W4

    W5

    W6

    W7

    W8

    7000 6000 6000 6000 6000 12000 6000 6000 6000 6000 6260

    6442

    6442

    6442

    6442

    6442

    6442

    3865

    0

    GARIS BATAS ATAP

    GARIS BATAS ATAP

    PUNCAK ATAP

    RB1

    RB1

    RB1

    RB1

    RB1

    RB1

    RB1

    RB1

    RB1

    RB1

    RB1

    RB1

    RB1

    RB1

    RB1

    RB1

    RB1

    RB1

    RB1

    RB1

    RB1

    RB1

    RB1

    RB1

    RB1RB1

    RB1RB1

    RB1

    RB1

    RB1

    RB1

    RB1

    RB1

    RB1

    RB1

    RB1

    RB1

    RB1

    RB1

    RB1

    RB1

    RB1

    RB1

    RB1 RB1

    RB1RB1 RB1RB1 RB1RB1 RB1RB1 RB1RB1 RB1RB1 RB1RB1 RB1RB1 RB1RB1

    RB1 RB1

    RB1 RB1

    RB1 RB1

    RB1 RB1

    SE-01113

    SE-01111

    SE-01112

    SE-01114

    SE-01125

    SE-01126

    WG

    B10

    TR1

    TR1

    TR1

    TR1

    TR1

    TR1

    TR1

    TR1

    TR1

    TR1

    TR1

    B10

    B10

    TR1

    TR1

    TR1

    TR1

    TR1

    TR1

    TR1

    TR1

    TR1

    TR1

    TR1

    B10

    TR2TR2

    TR2TR2

    T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3

    TR2TR2

    TR2

    TR2

    TR2

    T3 T3

    TR2

    TR2

    TR2

    TR2

    T3

    TR2

    TR2

    TR2

    TR2

    T3 T3 T3 T3 T3 T3 T3 T3 T3

    TR2

    TR2

    TR2

    TR2TR2

    TR2

    TR2

    TR2TR2

    TR2

    TR2

    TR2

    TR2TR2

    TR2

    TR2

    TR2

    TR2TR2

    TR2

    TR2

    TR2

    TR2TR2

    TR2

    TR2

    TR2

    TR2TR2

    TR2

    TR2

    TR2

    TR2TR2

    TR2

    TR2

    TR2

    TR2TR2

    TR2

    TR2

    TR2

    TR2

    VB VB VB

    VBVBVB

    DENGAN DUA BARIS PENGIKAT BESI DIA20mm DISETIAP DUA RANGKA ATAPGORDING BAJA T2 (LIHAT TABEL)

    WH WI WJ WK WL WM

    W1

    W2

    SE-01113

    SE-01114

    SE-01127

    C1 C1 C1 C1 C1 VB C1

    B11

    B11

    B11

    B11

    B11

    B11

    RB1RB1

    RB1 RB1

    C4 C4 T4 T4 T4 T4

    RB1RB1

    C4C4C4C4VB

    T3 T3 T3 T3 T3

    DENGAN DUA BARIS PENGIKAT BESI DIA20mm DISETIAP DUA RANGKA BAJAGORDING BAJA T2 (LIHAT TABEL)

    GAMBAR INI DISAJIKAN UNTUK DIBACA BERSAMA-SAMA DENGAN GAMBAR-GAMBAR ARSITEKTUR.

    UKURAN-UKURAN JARAK, KETINGGIAN DAN ASBANGUNAN DITENTUKAN BERSAMA-SAMADENGAN GAMBAR-GAMBAR ARSITEKTUR.

    MUTU BAJA STRUKTUR :BJ 41 / JIS SS400 : Fy = 250 MPa

    UNTUK PERMOHONAN IMBDO NOT SCALE

    Drawing Plotted:

    IF IN DOUBT ASK.

    Docu

    ment

    No.

    Discipline

    Drawing No. Rev.

    Title

    Project

    Client

    Drawing Originator

    OriginalScale (A1)

    ReducedScale (A3)

    Design

    Drawn

    Dsg Verifier

    Dwg Check

    No. Revision DateAppdChkBy

    PROJECT NORTH

    TRUE NORTH102.39

    RICH PRODUCTS, CORPJL. UTAMA MODERN INDUSTRIBLOCK BA NO.5KAWASAN MODERN INDUSTRI,CIKANDE, SERANG, BANTEN

    KETERANGAN

    14/9/2015 3:42:58 PM

    D:\R

    evit\R

    ichs\2

    8525

    51-S

    E-RI

    CHS-

    2016

    -IM

    B_MI

    S1.rv

    t

    As indicated

    BANGUNAN PRODUKSI/GUDANGDENAH RANGKA TAP

    A

    STRUKTUR

    2820056-SE-0103

    PROYEK RICHS JAKARTA

    JO3 SEP'2015STNYHN

    HP1

    SEP'2015SEP'2015

    SEP'2015

    - 1 : 200A DENAH RANGKA ATAP ATAS

    - 1 : 200B DENAH RANGKA ATAP BAWAH

    UNTUK PERMOHONAN IMB 14.09.2015A

    TABEL RANGKA BAJATIPE UKURAN

    B10 WF400x200B11 WF350x175x7x11RB1T2 C 200x75x20x3.2T3 WF300x150x6.5x9T4 WF200x100VB RANGKAP L 100 x100 x 10

    BESI BETON DIA20mm

  • LEVEL 0 - LT DASARRL 0.000 m

    LEVEL 2 - ATAP UTILITYRL 6.250 m

    LEVEL 4 - ATAP PRODUKSI/GUDANGRL 14.227 m

    LEVEL P - PONDASIRL -2.200 m

    W2W3W4W5W6W7W8

    T4 T4 T4 T4 T4 T4

    T4T4

    T4T4T4

    T4T4

    T4T4T4

    T4 T4

    C1 C3 C3 C3 C3 C3 C

    1

    B10 B10

    LEVEL 0 - LT DASARRL 0.000 m

    LEVEL 2 - ATAP UTILITYRL 6.250 m

    LEVEL 4 - ATAP PRODUKSI/GUDANGRL 14.227 m

    LEVEL U - LT UTILITYRL -1.050 m

    LEVEL P - PONDASIRL -2.200 m

    W2W3W4W5W6W7W8

    A

    B

    9000

    9000

    C1C1

    TR1 TR1

    LEVEL 0 - LT DASARRL 0.000 m

    LEVEL 2 - ATAP UTILITYRL 6.250 m

    LEVEL 4 - ATAP PRODUKSI/GUDANGRL 14.227 m

    LEVEL U - LT UTILITYRL -1.050 m

    LEVEL P - PONDASIRL -2.200 m

    W1W2W3W4W5W6W7W8

    B11

    C4

    C1C1

    TR1 TR1

    LEVEL 0 - LT DASARRL 0.000 m

    LEVEL 4 - ATAP PRODUKSI/GUDANGRL 14.227 m

    LEVEL P - PONDASIRL -2.200 m

    W1W2W3W4W5W6W7W8

    C

    C1 C3 C3 C3 C3 C3 C1T4 T4 T4 T4 T4 T4

    B11

    C4

    T4T4T4T4T4T4

    T4 T4 T4 T4 T4 T4

    B10 B10

    GAMBAR INI DISAJIKAN UNTUK DIBACA BERSAMA-SAMA DENGAN GAMBAR-GAMBAR ARSITEKTUR.

    UKURAN-UKURAN JARAK, KETINGGIAN DAN ASBANGUNAN DITENTUKAN BERSAMA-SAMADENGAN GAMBAR-GAMBAR ARSITEKTUR.

    MUTU BAJA STRUKTUR :BJ 41 / JIS SS400 : Fy = 250 MPa

    UNTUK PERMOHONAN IMBDO NOT SCALE

    Drawing Plotted:

    IF IN DOUBT ASK.

    Docu

    ment

    No.

    Discipline

    Drawing No. Rev.

    Title

    Project

    Client

    Drawing Originator

    OriginalScale (A1)

    ReducedScale (A3)

    Design

    Drawn

    Dsg Verifier

    Dwg Check

    No. Revision DateAppdChkBy

    RICH PRODUCTS, CORPJL. UTAMA MODERN INDUSTRIBLOCK BA NO.5KAWASAN MODERN INDUSTRI,CIKANDE, SERANG, BANTEN

    KETERANGAN

    14/9/2015 3:43:25 PM

    D:\R

    evit\R

    ichs\2

    8525

    51-S

    E-RI

    CHS-

    2016

    -IM

    B_MI

    S1.rv

    t

    As indicated

    BANGUNAN PRODUKSI/GUDANG -POTONGAN LEMBAR 1

    A

    STRUKTUR

    2820056-SE-0111

    PROYEK RICHS JAKARTA

    JO3 SEP'2015STNYHN

    HP1

    SEP'2015SEP'2015

    SEP'2015

    SE-0102 1 : 2001 POTONGAN

    SE-0102 1 : 2002 POTONGAN

    SE-0102 1 : 2003 POTONGAN

    SE-0102 1 : 2004 POTONGAN

    UNTUK PERMOHONAN IMB 14.09.2015A

  • LEVEL 0 - LT DASARRL 0.000 m

    LEVEL 2 - ATAP UTILITYRL 6.250 m

    LEVEL 4 - ATAP PRODUKSI/GUDANGRL 14.227 m

    LEVEL P - PONDASIRL -2.200 m

    WA WB WC WD WE WF WH WI WJ WK WL WM

    VBVB

    WG

    VB VB

    VBVB

    T3

    T3

    VBVB

    VB VB

    VB VB

    C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1

    VBVB

    VB VB

    VB VB

    T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3

    T3T3T3T3T3T3T3T3T3T3T3

    PC6A P1 P2A P

    2B P1 P2B P2A P1 P2B P2A P1 P2B P1 P2

    BP2A P

    2B P1

    P2B P2A

    P1 P2B P1 P2B P1 P2B P1 P2B P1 P2B

    LEVEL 0 - LT DASARRL 0.000 m

    LEVEL 4 - ATAP PRODUKSI/GUDANGRL 14.227 m

    LEVEL P - PONDASIRL -2.200 m

    WA WB WC WD WE WF WH WI WJ WK WL WM DWGTR2 TR2 TR2 TR2 TR2 TR2 TR2 TR2 TR2 TR2 TR2 TR2

    C3 C3

    P6B

    P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1

    P2AP1

    LEVEL 0 - LT DASARRL 0.000 m

    LEVEL 1 - LT KANTORRL 4.200 m

    LEVEL P - PONDASIRL -2.200 m

    WH WI WJ WK WL WM

    C4 C4 C4 C4 C4 C4

    VBVB

    P2B P2B P1 P2B P1 P2B P1 P

    2B P1 P2B

    GAMBAR INI DISAJIKAN UNTUK DIBACA BERSAMA-SAMA DENGAN GAMBAR-GAMBAR ARSITEKTUR.

    UKURAN-UKURAN JARAK, KETINGGIAN DAN ASBANGUNAN DITENTUKAN BERSAMA-SAMADENGAN GAMBAR-GAMBAR ARSITEKTUR.

    MUTU BAJA STRUKTUR :BJ 41 / JIS SS400 : Fy = 250 MPa

    UNTUK PERMOHONAN IMBDO NOT SCALE

    Drawing Plotted:

    IF IN DOUBT ASK.

    Docu

    ment

    No.

    Discipline

    Drawing No. Rev.

    Title

    Project

    Client

    Drawing Originator

    OriginalScale (A1)

    ReducedScale (A3)

    Design

    Drawn

    Dsg Verifier

    Dwg Check

    No. Revision DateAppdChkBy

    RICH PRODUCTS, CORPJL. UTAMA MODERN INDUSTRIBLOCK BA NO.5KAWASAN MODERN INDUSTRI,CIKANDE, SERANG, BANTEN

    KETERANGAN

    14/9/2015 3:43:58 PM

    D:\R

    evit\R

    ichs\2

    8525

    51-S

    E-RI

    CHS-

    2016

    -IM

    B_MI

    S1.rv

    t

    As indicated

    BANGUNAN PRODUKSI/GUDANG -POTONGAN LEMBAR 2

    A

    STRUKTUR

    2820056-SE-0112

    PROYEK RICHS JAKARTA

    JO3 SEP'2015STNYHN

    HP1

    SEP'2015SEP'2015

    SEP'2015

    SE-0102 1 : 2005 POTONGAN

    SE-0102 1 : 2006 POTONGAN

    SE-0102 1 : 2007 POTONGAN

    UNTUK PERMOHONAN IMB 14.09.2015A

  • LEVEL 0 - LT DASARRL 0.000 m

    LEVEL 2 - ATAP UTILITYRL 6.250 m

    LEVEL 4 - ATAP PRODUKSI/GUDANGRL 14.227 m

    LEVEL U - LT UTILITYRL -1.050 m

    LEVEL P - PONDASIRL -2.200 m

    W8U1

    KOLOM BAJA

    SAMBUNGAN ANTARAKOLOM KE TRUSSMENGGUNAKAN PLAT DAN BAUT

    FLASHING

    KERB BATU BATALEBAR 150mm DAN TINGGI 300mmDI PASANG SEKELILING LANTAI DAK ATAP

    15.00

    KUDA KUDA BAJA TRUSSDENGAN MATERIALPROFIL BAJA TDAN BAJA SIKU.

    C1

    P1

    P2B

    AREA KORIDOR AREA GUDANG LEVEL 0 - LT DASARRL 0.000 m

    LEVEL P - PONDASIRL -2.200 m

    W2

    SAMBUNGAN ANTARAKOLOM KE TRUSSMENGGUNAKAN PLAT DAN BAUT

    AREA GUDANG

    SAMBUNGAN ANTARAKOLOM BAJA KE KOLOM BETONMENGGUNAKAN ANGKUR BAUTDAN PLAT BAJA

    BALOK PENGIKATANTARA KOLOM

    SEMUA BRACINGMENNGUNAKAN MATERIALBAJA SIKU.

    IKATAN ANGINBESI BETON DIAMETER16

    C1

    P2B

    P1

    LEVEL 0 - LT DASARRL 0.000 m

    LEVEL 1 - LT KANTORRL 4.200 m

    LEVEL 4 - ATAP PRODUKSI/GUDANGRL 14.227 m

    LEVEL P - PONDASIRL -2.200 m

    W1

    W2

    FLASHING

    RANGKA CLADDINGC-200x65x20x3.2TIPIKAL

    CLADDING SHEET

    B11

    C4

    C1

    T4

    T4

    ?

    P2BP1 P1

    P2B

    AREA UNLOADING

    SAMBUNGAN DENGANEND PLATE DAN BAUT

    WM

    C3

    MUTU TULANGAN < 10mm BJTP24 : Fy = 240 MPaD > 10mm BJTD40 : Fy = 400 MPa

    GAMBAR INI DISAJIKAN UNTUK DIBACA BERSAMA-SAMA DENGAN GAMBAR-GAMBAR ARSITEKTUR.

    UKURAN-UKURAN JARAK, KETINGGIAN DAN ASBANGUNAN DITENTUKAN BERSAMA-SAMADENGAN GAMBAR-GAMBAR ARSITEKTUR.

    MUTU BAJA STRUKTUR :BJ 41 / JIS SS400 : Fy = 250 MPa

    UNTUK PERMOHONAN IMBDO NOT SCALE

    Drawing Plotted:

    IF IN DOUBT ASK.

    Docu

    ment

    No.

    Discipline

    Drawing No. Rev.

    Title

    Project

    Client

    Drawing Originator

    OriginalScale (A1)

    ReducedScale (A3)

    Design

    Drawn

    Dsg Verifier

    Dwg Check

    No. Revision DateAppdChkBy

    RICH PRODUCTS, CORPJL. UTAMA MODERN INDUSTRIBLOCK BA NO.5KAWASAN MODERN INDUSTRI,CIKANDE, SERANG, BANTEN

    KETERANGAN

    14/9/2015 3:45:16 PM

    D:\R

    evit\R

    ichs\2

    8525

    51-S

    E-RI

    CHS-

    2016

    -IM

    B_MI

    S1.rv

    t

    As indicated

    BANGUNAN PRODUKSI/GUDANG -DETIL LEMBAR 1

    A

    STRUKTUR

    2820056-SE-0121

    PROYEK RICHS JAKARTA

    JO3 SEP'2015STNYHN

    HP1

    SEP'2015SEP'2015

    SEP'2015

    SE-0111 1 : 50A DETAIL PRINSIP AS W8

    SE-0111 1 : 50B DETAIL PRINSIP AS W2

    SE-0111 1 : 50C DETAIL PRINSIP AS W2 ( AREA BONGKAR MUAT )

    SE-0112 1 : 25D DETAIL PRINSIP AS WM

    UNTUK PERMOHONAN IMB 14.09.2015A

    RANGKA CLADDINGC-200x65x20x3.2TYPIKAL

    CLADDING SHEET

    DINDING BETON

  • 350

    OF PILE

    150 THK SLABBETON ATAS200 INSULATION200 SLAB BETONBAWAH

    TIANG PANCANG PRECASTPRESTLILE CONCRETE 350x350DIPANCANG SAMPAI KEDALAMANL=9.0m /TANAH KERAS DARIMUKA TANAH ASLI

    B1B2

    T2T1

    TANAH URUG

    1200

    800

    TANAH ASLILEVEL MUKA

    LANTAI DASARLEVEL

    350

    OF PILE

    SLAB BETON

    TIANG PANCANG PRECASTPRESTLILE CONCRETE 350x350DIPANCANG SAMPAI KEDALAMANL=9.0m /TANAH KERAS DARIMUKA TANAH ASLI

    B1B2

    T2T1

    TANAH URUG

    800

    1200

    200

    TANAH ASLILEVEL MUKA

    LANTAI DASARLEVEL

    350

    OF PILE

    175 THK 150 THKSLAB BETON ATAS200 INSULATION200 SLABBETON BAWAH

    TIANG PANCANG PRECASTPRESTLILE CONCRETE 350x350DIPANCANG SAMPAI KEDALAMANL=9.0m /TANAH KERAS DARIMUKA TANAH ASLI

    B1B2

    T2T1

    TANAH URUG

    800 1

    200

    TANAH ASLILEVEL MUKA

    LANTAI DASARLEVEL

    OF COLUMN

    B1B2

    T2

    T1

    500

    700

    1000

    2200

    600

    INTO

    FOO

    TING

    50 T

    OP P

    ILE

    TIANG PANCANG PRECASTPRESTLILE CONCRETE 350x350DIPANCANG SAMPAI KEDALAMANL=9.0m /TANAH KERAS DARIMUKA TANAH ASLI

    BALOK BETON

    SLAB BETON

    TANAH URUG

    BALOK SLOOF 400x600

    BALOK BETON

    TEMBOK PENAHANTANAHT = 150 THKTULANGAN D16-150

    TANAH ASLILEVEL MUKA

    LANTAI DASARLEVEL

    PONDASILEVEL P

    300

    300

    600

    350 1000 350

    1700

    OF COLUMN

    B1B2

    T2

    T1

    500

    700

    1000

    2200

    600

    INTO

    FOO

    TING

    50 T

    OP P

    ILE

    TIANG PANCANG PRECASTPRESTLILE CONCRETE 350x350DIPANCANG SAMPAI KEDALAMANL=9.0m /TANAH KERAS DARIMUKA TANAH ASLI

    BALOK BETON

    SLAB BETON

    TANAH URUG

    BALOK SLOOF 400x600

    BALOK BETON

    TEMBOK PENAHANTANAHT = 150 THKTULANGAN D16-150

    TANAH ASLILEVEL MUKA

    LANTAI DASARLEVEL

    PONDASILEVEL P

    450

    450

    900

    350 1000 350

    1700

    MUTU BETON :PELAT LANTAI & BALOK : Fc' = 30 MPaKOLOM : Fc' = 30 MPaPILE CAP : Fc' = 25 MPaTEMBOK PENAHAN : Fc' = 30 MPa

    MUTU TULANGAN < 10mm BJTP24 : Fy = 240 MPaD > 10mm BJTD40 : Fy = 400 MPa

    UNTUK PERMOHONAN IMBDO NOT SCALE

    Drawing Plotted:

    IF IN DOUBT ASK.

    Docu

    ment

    No.

    Discipline

    Drawing No. Rev.

    Title

    Project

    Client

    Drawing Originator

    OriginalScale (A1)

    ReducedScale (A3)

    Design

    Drawn

    Dsg Verifier

    Dwg Check

    No. Revision DateAppdChkBy

    RICH PRODUCTS, CORPJL. UTAMA MODERN INDUSTRIBLOCK BA NO.5KAWASAN MODERN INDUSTRI,CIKANDE, SERANG, BANTEN

    KETERANGAN

    14/9/2015 3:53:26 PM

    D:\R

    evit\R

    ichs\2

    8525

    51-S

    E-RI

    CHS-

    2016

    -IM

    B_MI

    S1.rv

    t

    As indicated

    BANGUNAN PRODUKSI/GUDANG -DETIL LEMBAR 2

    A

    STRUKTUR

    2820056-SE-0122

    PROYEK RICHS JAKARTA

    JO3 SEP'2015STNYHN

    HP1

    SEP'2015SEP'2015

    SEP'2015

    1 : 251 POTONGAN

    1 : 252 POTONGAN

    1 : 253 POTONGAN

    1 : 254 POTONGAN

    1 : 25P2A DENAH PILE CAP

    1 : 255 POTONGAN

    - 1 : 25P2B DENAH PILE CAP

    UNTUK PERMOHONAN IMB 14.09.2015A

  • WA WB WC WD WE WF WH WI WJ

    W8

    U3

    U2

    U1

    UKUJUIUHUGUB UC UD UE UFUA

    WG

    PC6A

    P3

    P2A

    P2A

    P2A P2A P2A P2A P2A P2A P2A P2A

    P2A

    P2AP3 P3 P3 P3

    P3P3 P3 P3 P2A

    P2A P2A P2A P2A P2A P2A P2A P2A P2

    AP2A

    5975

    6000

    1197

    5

    5000 5000 5000 5000 5000 5000 5000 4667 4667 466749000

    ELEVASI TOP OF PILE CAP-2.200( TYP)

    ELEVASI TOP OF PILE CAP-2.200( TYP)

    DINDING BETON T=150DIPASANG DARI EL-2.200 SAMPAI+0.000 (ELEVASI BANGUNAN GUDANG)

    PILE

    CAP

    600

    400

    200

    BALOK SLOOF

    PLAT LANTAI BETON50

    (TYP

    )TIANG PANCANG PRECASTPRESTLILE CONCRETE 350x350DIPANCANG SAMPAI KEDALAMANL=9.0m /TANAH KERAS DARIMUKA TANAH ASLI

    KOLOM BETON

    M.T.A M.T.A

    1070 550

    350

    1000

    350

    700

    350 920 350

    1620

    1700

    500

    500

    350

    350

    300

    TITK POINT KOLOM

    SE-02011

    PILE

    CAP

    600

    400

    200

    BALOK SLOOF

    LANTAI BETON

    50 (T

    YP)

    TIANG PANCANG PRECASTPRESTLILE CONCRETE 350x350DIPANCANG SAMPAI KEDALAMANL=9.0m /TANAH KERAS DARIMUKA TANAH ASLI

    KOLOM BETON

    M.T.A

    300

    300

    600

    350 1000 350

    1700

    SE-02012

    GAMBAR INI DISAJIKAN UNTUK DIBACA BERSAMA-SAMA DENGAN GAMBAR-GAMBAR ARSITEKTUR.

    UKURAN-UKURAN JARAK, KETINGGIAN DAN ASBANGUNAN DITENTUKAN BERSAMA-SAMADENGAN GAMBAR-GAMBAR ARSITEKTUR.

    MUTU BETON :PELAT LANTAI & BALOK : Fc' = 30 MPaKOLOM : Fc' = 30 MPaPILE CAP : Fc' = 25 MPaTEMBOK PENAHAN : Fc' = 30 MPa

    MUTU TULANGAN < 10mm BJTP24 : Fy = 240 MPaD > 10mm BJTD40 : Fy = 400 MPa

    UNTUK PERMOHONAN IMBDO NOT SCALE

    Drawing Plotted:

    IF IN DOUBT ASK.

    Docu

    ment

    No.

    Discipline

    Drawing No. Rev.

    Title

    Project

    Client

    Drawing Originator

    OriginalScale (A1)

    ReducedScale (A3)

    Design

    Drawn

    Dsg Verifier

    Dwg Check

    No. Revision DateAppdChkBy

    PROJECT NORTH

    TRUE NORTH102.39

    RICH PRODUCTS, CORPJL. UTAMA MODERN INDUSTRIBLOCK BA NO.5KAWASAN MODERN INDUSTRI,CIKANDE, SERANG, BANTEN

    KETERANGAN

    14/9/2015 3:45:48 PM

    D:\R

    evit\R

    ichs\2

    8525

    51-S

    E-RI

    CHS-

    2016

    -IM

    B_MI

    S1.rv

    t

    As indicated

    BANGUNAN UTILITY - DENAH DANDETIL PONDASI

    A

    STRUKTUR

    2820056-SE-0201

    PROYEK RICHS JAKARTA

    JO3 SEP'2015STNYHN

    HP1

    SEP'2015SEP'2015

    SEP'2015

    - 1 : 200A DENAH PONDASI BANGUNAN UTILITY

    SE-0201 1 : 251 POTONGAN

    - 1 : 25P3 DENAH PILE CAP

    SE-0201 1 : 252 POTONGAN

    - 1 : 25P2A DENAH PILE CAP

    UNTUK PERMOHONAN IMB 14.09.2015A

    CATATAN :SEMUA PILE CAP YANG DI BERI LABEL ADALAH PILECAP UNTUK AREA UTILITY.

  • WA WB WC WD WE WF WH WI WJ

    W8

    U3

    U2

    U1

    UKUJUIUHUGUB UC UD UE UFUA

    SE-02032

    SE-02031

    5000 5000 5000 5000 5000 5000 5000 4667 4667 4667

    WG

    B3 B3 B3 B3 B3 B3 B3 B3 B3 B3B3

    B3

    B3B3

    B3B3 B3

    B3 B3B3 B3

    B3 B3B3

    B3B3 B3

    B3 B3B3

    B3B3

    B3

    B3 B3 B3 B3 B3 B3 B3 B3 B3 B3

    B3 B3 B3 B3 B3 B3 B3 B3 B3

    SEMUA BALOK ANAKADALAH B4, KECUALI DITULIS LAIN

    PLAT BETON T=200mmDENGAN TULANGAN D13-150(2 LAYER) ATAS BAWAH

    DINDING BETON T=200mmTIPIKAL

    5975

    6000

    WA WB WC WD WE WF WH WI WJ

    W8

    U3

    U2

    U1

    UKUJUIUHUGUB UC UD UE UFUA

    SE-02032

    SE-02031

    B4B4

    B4B4

    C2 C2 B4

    WG

    SEMUA BALOK ANAKADALAH B2, KECUALI DITULIS LAIN

    PLAT BETON T=200mmDENGAN TULANGAN D13-150(2 LAYER) ATAS BAWAH

    C2

    C2

    C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2

    C2C2C2C2C2C2C2C2C2

    C2 C2 C2 C2 C2 C2 C2 C2B4 B4 B4 B4 B4 B4 B4

    B4 B4 B4 B4 B4 B4 B4 B4 B4 B4

    B4 B4 B4 B4 B4 B4 B4 B4 B4 B4

    B4B4 B4

    B4B4 B4

    B4 B4B4 B4

    B4 B4B4

    B4B4 B4

    B4 B4B4 B4

    B4

    5000 5000 5000 5000 5000 5000 5000 4667 4667 4667

    5975

    6000

    GAMBAR INI DISAJIKAN UNTUK DIBACA BERSAMA-SAMA DENGAN GAMBAR-GAMBAR ARSITEKTUR.

    UKURAN-UKURAN JARAK, KETINGGIAN DAN ASBANGUNAN DITENTUKAN BERSAMA-SAMADENGAN GAMBAR-GAMBAR ARSITEKTUR.

    MUTU BETON :PELAT LANTAI & BALOK : Fc' = 30 MPaKOLOM : Fc' = 30 MPaPILE CAP : Fc' = 25 MPaTEMBOK PENAHAN : Fc' = 30 MPa

    MUTU TULANGAN < 10mm BJTP24 : Fy = 240 MPaD > 10mm BJTD40 : Fy = 400 MPa

    BALOKB4300x500

    5D19 3D19 2D10D10-150

    3D19 5D19 2D10D10-200

    500

    500

    300 300

    SENGKANG

    B3400x600

    PINGGIR TENGAH

    D10-150

    JENIS TULANGANATAS BAWAH TENGAH

    5D19 5D19 2D10D10-150

    5D19 5D19 2D10D10-150

    600

    400 400

    600

    ATAS BAWAH TENGAH

    JENIS TULANGANATAS BAWAH ATAS BAWAH TENGAH

    SENGKANG

    AREA

    BALOKB2250x400

    3D16 3D16 2D10D10-150

    3D16 3D16 2D10D10-200

    250

    400

    250

    400

    JENIS TULANGANATAS BAWAH TENGAH ATAS BAWAH TENGAH

    SENGKANG

    PONDASI PILE CAP

    GRID

    LANTAI DASAR& LANTAI ATAP DAK

    16-D22

    SEMUA GRID

    D10-150 D10-150 D10-150

    450

    450

    16-D22

    D10-150 D10-150 D10-150

    JENIS TULANGAN

    SENGKANGPINGGIR TENGAH SAMBUNGAN

    JENIS TULANGAN

    SENGKANGPINGGIR TENGAH SAMBUNGAN

    450

    450

    UNTUK PERMOHONAN IMBDO NOT SCALE

    Drawing Plotted:

    IF IN DOUBT ASK.

    Docu

    ment

    No.

    Discipline

    Drawing No. Rev.

    Title

    Project

    Client

    Drawing Originator

    OriginalScale (A1)

    ReducedScale (A3)

    Design

    Drawn

    Dsg Verifier

    Dwg Check

    No. Revision DateAppdChkBy

    PROJECT NORTH

    TRUE NORTH102.39

    RICH PRODUCTS, CORPJL. UTAMA MODERN INDUSTRIBLOCK BA NO.5KAWASAN MODERN INDUSTRI,CIKANDE, SERANG, BANTEN

    KETERANGAN

    14/9/2015 3:46:04 PM

    D:\R

    evit\R

    ichs\2

    8525

    51-S

    E-RI

    CHS-

    2016

    -IM

    B_MI

    S1.rv

    t

    As indicated

    BANGUNAN UTILITY - DENAHLANTAI DAN ATAP

    A

    STRUKTUR

    2820056-SE-0202

    PROYEK RICHS JAKARTA

    JO3 SEP'2015STNYHN

    HP1

    SEP'2015SEP'2015

    SEP'2015

    - 1 : 200B DENAH LANTAI

    - 1 : 200C DENAH ATAP

    UNTUK PERMOHONAN IMB 14.09.2015A

    1 : 201 TABEL PENJELAS BALOK BETON

    1 : 202 TABEL PENJELAS KOLOM BETON

  • LEVEL 2 - ATAP UTILITYRL 6.250 m

    LEVEL U - LT UTILITYRL -1.050 m

    LEVEL P - PONDASIRL -2.200 m

    UKUJUIUHUGTD UB UC UD UE UFUA TE

    4667466746675000500050005000500050005000

    C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2

    B4 B4 B4 B4 B4 B4 B4 B4 B4 B4

    B3B3B3B3B3B3B3B3B3B3

    P2A P2A P2A P2A P2A P2A P2AP2A P2A P2A P2A

    LEVEL 0 - LT DASARRL 0.000 m

    LEVEL 2 - ATAP UTILITYRL 6.250 m

    LEVEL U - LT UTILITYRL -1.050 m

    LEVEL P - PONDASIRL -2.200 m

    W8U3 U2 U1

    A

    P2A P3 P2A P2B

    B4 B4

    C2 C2 C2C1

    B3 B3

    LEVEL 2 - ATAP UTILITYRL 6.250 m

    LEVEL U - LT UTILITYRL -1.050 m

    LEVEL P - PONDASIRL -2.200 m

    U3

    MUKA TANAH ASLI 200

    1150

    200

    7300

    GAMBAR INI DISAJIKAN UNTUK DIBACA BERSAMA-SAMA DENGAN GAMBAR-GAMBAR ARSITEKTUR.

    UKURAN-UKURAN JARAK, KETINGGIAN DAN ASBANGUNAN DITENTUKAN BERSAMA-SAMADENGAN GAMBAR-GAMBAR ARSITEKTUR.

    MUTU BETON :PELAT LANTAI & BALOK : Fc' = 30 MPaKOLOM : Fc' = 30 MPaPILE CAP : Fc' = 25 MPaTEMBOK PENAHAN : Fc' = 30 MPa

    MUTU TULANGAN < 10mm BJTP24 : Fy = 240 MPaD > 10mm BJTD40 : Fy = 400 MPa

    UNTUK PERMOHONAN IMBDO NOT SCALE

    Drawing Plotted:

    IF IN DOUBT ASK.

    Docu

    ment

    No.

    Discipline

    Drawing No. Rev.

    Title

    Project

    Client

    Drawing Originator

    OriginalScale (A1)

    ReducedScale (A3)

    Design

    Drawn

    Dsg Verifier

    Dwg Check

    No. Revision DateAppdChkBy

    RICH PRODUCTS, CORPJL. UTAMA MODERN INDUSTRIBLOCK BA NO.5KAWASAN MODERN INDUSTRI,CIKANDE, SERANG, BANTEN

    KETERANGAN

    14/9/2015 3:46:18 PM

    D:\R

    evit\R

    ichs\2

    8525

    51-S

    E-RI

    CHS-

    2016

    -IM

    B_MI

    S1.rv

    t

    As indicated

    BANGUNAN UTILITY - POTONGANDAN DETIL

    A

    STRUKTUR

    2820056-SE-0203

    PROYEK RICHS JAKARTA

    JO3 SEP'2015STNYHN

    HP1

    SEP'2015SEP'2015

    SEP'2015

    SE-0202 1 : 2001 POTONGAN

    SE-0202 1 : 2002 POTONGAN

    - 1 : 25A DETAIL PRINSIP

    UNTUK PERMOHONAN IMB 14.09.2015A

    2820056-SE-00002820056-SE-00012820056-SE-00022820056-SE-00032820056-SE-01012820056-SE-01022820056-SE-01032820056-SE-01112820056-SE-01122820056-SE-01212820056-SE-01222820056-SE-02012820056-SE-02022820056-SE-0203