15.Rencana Cut and Fill
-
Upload
iwan-kantie-mala -
Category
Documents
-
view
53 -
download
26
description
Transcript of 15.Rencana Cut and Fill
PEMBERI TUGAS
KEGIATAN
CATATAN
MENGETAHUI
PENGELOLA TEKNIS
JUDUL GAMBAR
KONSULTAN PERENCANA
DIHITUNG / CALCULATION
NO.
1.
2.
3.
4.
TANGGAL DIGAMBARDIPERIKSA DISETUJUI
SKALA
SCALE
NO. PROYEK
PROJECT NO.
NO. GAMBAR
DRAWING NO.
PEMERINTAH PROVINSI JAWA BARAT
DINAS PETERNAKAN
JAWA BARAT
PEJABAT PEMBUAT KOMITMEN
HENDI RUHAENDI
NIP.19604131987031006
PEJABAT PELAKSANA TEKNIS KEGIATAN
PEPEN EFFENDI , S.Pt ; M.Pt
NIP.195807121979031009
1.
2.
5.
ARSITEK :
SIPIL :
ESTIMATOR :
DIGAMBAR :
ME :
3.
6.
DIREKTUR :
7.
ATANG SUTISNA ,ST
SUPRAYOGI ,ST
Ir. AGUS SUMARNA
DRA. MUAWIYAH
DEKA ANDRIYANA
SITI RAHAYU
RENCANA CUT AND FILL
1: 300
ACHMAD HAIDAR S.,ST.,MT IRWAN.,ST
PENGUATAN SARANA UPTD BALAI PERBIBITAN
DAN PENGEMBANGAN INSEMINASI BUATAN
TERNAK SAPI PERAH BUNI KASIH
TAHUN 2015
STR.01
958.07
965.48
954.54
966.90
968.65
965.43
SITE KANDANG FREE STALL
SKALA 1 : 300
POTONGAN MEMANJANG
SKALA 1 : 200
17
51
18
11
8
508 350 1969 1115
RENCANA GALIAN
LEVEL RENCANA
RENCANA PENIMBUNAN
LEVEL EXISTING
LEVEL EXISTING
LEVEL EXISTING