BHAKRA BEAS MANAGE,ME,NT BOARI)
IRRIGATION WING
E,ME,RGE,NCY ACTION PLAN / DISASTE,R
MANAGE,ME,NT PLAN
FOR
BHAKRA DAM
DOC NO. BHD/DE,SIGN/EAPISSIJE NO:-02
(Reference DOC NO.-MR/IMS lPlzl). MR/I}j4SIPIZ3
EFFECTIVE DATE: 12-01 -20 1 9
DIRECTOR DESIGNB& DESIGN DIRECTORATE
BBMB (IW), NANGAL TOWNSHIPTEL: 01881-223108
BHAKRA BEASMANAGE,MENT
BOARD
BHAKRA NANGAL PROJECT'INTEGRATED MANAGEMENT SYSTEM
Doc. No.BHDIDESIGN/BAP-Date:12-07-2019Issue No. 02Page. I of 1
Page Revision No. 0
TITLE: EMERGENCY ACTION PLANFORHANDLING SITUATION ARISII{G OUT OF
HYDROLOGICAL FAILURES, EARTHQUAKESOR OTHERS. dIeC
FORWARD
Emergency situation may arise out of flood, water leakage, other accidents,
terrorist attack and other disaster/natural calamity such as earthquake etc at any time.
These disasters may cause serious loss to life and property.
Under such situation, the risks should be foreseen to the extent possible well in
advance and actions need to be taken be well documented, practiced and revised as per
situation. This will ensure the preparedness in respect of all related aspects to avoid the
disasters and to minimize the losses. lt will also help to ensure immediate corrective
actions to plug the situation by arranging all possible means required to prevent any
emergency occurrence.
Better management, planning, coordination, rehearsals, collective and sincere
efforts by all at all time will help to achieve the desired objectives. The Emergency Action
Plan for Bhakra Dam has been prepared based on the guideline of Central water
Commission & data/information provided by the field offices.
This EAP will prove as an effective tool to handle the unforeseen situation to some
extent. All concerned of Bhakra Project to go through this EAP meticulously in letter &
spirit and also to educate their fellow colleagues accordingly. Deep involvement and
cooperation of all concerned and its associates is expected in effective implementation of
this emergency action plan.
=r*r,Kffi-2 q
Er S.K. BbdiDirector / Design,Bhakra Beas Design Dte,BBMB, Nangal Township.
lssued By
rL#&^ka
Senior Design Engineer,Bhakra Beas Design Dte,BBMB, Nangal Township.
Prepared By
$
Er. A.(. AggaruualChief E[rgineer,BhakraNangal Township.
:'...1 ". ,.':t''
BIIAKRA BEASMANAGEMENT
BOARD
BHAI(RA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
TITLE: EMERGENCY ACTION PLANFORHANDLING SITUATION ARISING OUT OF
HYDROLOGICAL FAILURES, EARTHQUAKESoR orHERS.COntrOlled
Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02Page. I of4Page Revision No. 0
TABLE OF CONTENTS
Item No. Title Paqe No.'1.0 Introduction 1-2
11 Emergency Action Plan 2-4
12 Notification Flow Chart 4-5
20 Responsibilities 5-7
21 Responsibility for evacuation, rescue & relief 7 -17
2.2 Control Room 17-18
2.3. EAP Coordinator "Responsibility" 18
2.4 Approval of the Plan 18-'19
30 Emergency Procedures 19
3.1 Emergency ldentification, evaluation & classification 19-23
32 Notification Proced ures 23-24
321 Event Report 24-25-26
40 Preventive Actions 26
41 Surveillance 26
42 Access to site 27
43 Emergency supplies and Resources 27
431 Material Availability 27-28
4.3.2 Machinery/Equipment availability 28
433 Contractors 28-29
Reviewed and Approved By lssued By
BHAKRA BEASMANAGE,MEN
.f BOARD
BHAI(RA NANGAL PROJECTTNTEGRATED MANAGEMENT SYSTEM
Doc. No.BHD/DESIGN/EAP-Date:12-07 -2019Issue No. 02Page.Z of 4Page Revision No. 0
TITLE: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISII\G OUT OF ITYDROLOGICAL
FAILURES, EARTHQUAKES OR OTHERS.
ControlBed
434 Labour 29
435 Engineers Experts 29
4.4 Co-ordinating lnformation on flows 29-31
4.5 Providing alternative sources of power 31-32
5.0 Execution of work at site 32-33
6.0 lnundation Maps 33-34
70 Description & location of NHC 34
80 Trainings 34-35
9.0
g1@to be discharged by different officers
ffi
Duties-Dut
Duties &
Drrt
Dutbs &
Duties &
35
35-36
92 36-37
9.3 37-40
94
t5-eG
40-42
42
42-43
g7
93g9
eioeT1
ea
43-44
44
44-47
47-51
51-56
56-58
5B-6b
6G61913 Outies A nesponsibilities of XEN,Bhakra Elect.Divn.Nangal
914 Duties & Responsibilities of Supdt.Proc. C/Stores lJlvn,Nangal
Dutres a nesp
D utres & Res p o ;n o', 6;. "1
p u o B a rvt a H ts p rta I ,'rtl a n g a I
61-64915
el6 64-65
I17 65-66
Prepared By
ASE.
Reviewed and APProved BY rl.ssued By
\ U).I-LL\ /--rsE/HO(MR)
BHAKRA BEASMANAGEMENT BOARD
BI{AKRA NANGAL PRO.IE CTINTEGRATED MANAGEMENT SYSTEM
TITLE: BMERGENCY ACTION PLANFORHANDLING SITUATION ARISING OUT OF
HYDROLOGICAL FAILURES, EARTHQUAKESOR OTHERS.
LIST OF ANNEXURES
Sr.
No.
Title Annexure Page
No.
I Layout Plan of Bhakra Dam 1-3
2 Salient Features of Bhakra Dam il 4-6
3 Alert Levels for emergency conditions ilt 7-12
4 Notification FlowChart IV 13-16
5 Narrative information listing of persons to be notified by Each individual 17 -31
6 Sample warning messages for different situations VI 32
7 List of Deputy Commissioners of Punjab & H.P. districts And lndian
Army, lndian X Navy & ln X ldian Air Force
vil 33-34
8. Name of Panchayats of Teh..Bangana and Tehsil Sri Naina Devi (H.P) vilt 35-36
I List of villages D/S of Bhakra Dam along with name of Sarpanch and
their contact numbers
IX 37
'10. List containing contact numbers of Media persons X 3B-39
11 List of facilities to be made available Each control room XI 40
12 Plan showing sites of higher elevations xil 41
13 Name of agencies lifting water from Bhakra Reservoir And Nangal Pond xilt 42
14. List of persons to be contacted during emergency XIV 43-47
15 List containing signatures of all parties XV 4B
16 Alternative contacts of persons to be notified as per N.F.C XVI 49 50
17 Report forms for emergency situation XVII 51-54
1B List of experts/retirees well conversant with Dam repairs XVIII 55
19 Repair and maintenance schedule for upkeep XIX 56-62
Of different components of Bhakra Dam
Prepared By Reviewed and Approved By
Directo,r^pesign
tl-,
BHAKRA BEASMANAGEMENT
BOARD
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
Doc. No.BHDIDESIGN/EAP-Date:12-07-2019Issue No. 02Page.4 of4Page Revision No. 0
TITLE: EMERGENCY ACTION PI,ANFORHANDLING SITUATION ARISING OUT OT'
HYDROLOGICAL F'AILURES, EARTHQUAKES ORorHERS. Controlleil
20.
Plan showing alternative routes for approaching Bhakra
Dam from different sites
XX 63
21. List of machinery for construction activities at Emergency
site
XXI 64
22. List of machinery with XEN Bhakra Mechanical Division,
Nangal/List of operators
XXI I 65-66
23 List of XXlll machinery /Equipments with BSL Project,
Sundernagar and Beas Dam Talwara
XXIII 67
24 List of contractors XXIV 68,69
25. List of firms XXV 70-71
26 List of contractors for labour arrangement XXVI 72
27. List of officers to be informed of floods XXVII 73
28, List of employees of RM&SR Divn/Loading centre on
Reservoir rim.
XXVIII 74-77
29. List of persons wot"king in Dam area XXIX &XXX
7B-84
30. Organizational set up of Bhakra Dam Nangal XXXI B5
3'1. List of Persons deployed at discharge sites u/s &d/s of XXXI I B6-BB
Bhakra Dam on River Sutlej
Reviewed and Approved By
Direltor flesign
Prepared By ls-sued By
k[L-
BHAKRA BEASMANAGEMENT
BOARD
BHAI(RA NANGAL PROJECTINTEGRATED MANAGEMEI{T SYSTEM
TITLE: EMERGENCY ACTION PLANFORIIANDI,ING SITUATION ARISING OUT OF
HYDROLOGICAL FAILURES, EARTHQUAI(ES QRorHERS. comtromeo
Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02Page. l of66Page Revision No. 0
1.0 INTORODUCTION
The present emergency action plan is designed for such a gigantic project which roosts
prominently in the world map of large dam. The Bhakra Dam is a concrete reality. lt is a straight
gravity dam rising 740 ft above the deepest foundation and 550 ft above the river bed level and span
the narrow gauge with a length of 1 700 ft at the top. The dam section has a downstream slope 0. B lJ:
lV and a vertical face on the upstream side above EI.'1350 ft with a slope of 0.35 H: 1 V below this
level which joins the upstream strut through a large fillet to provide support to the heel of the dam and
confine the clay stone underneath. The layout plan of the dam has been appended as Annexure_l
which also shows sectional view of Bhakra Dam and various inspection & drainage galleries within
dam body. The dam was constructed systematically according to a pre-meditated plan of blocks
(monoliths). The faces of the monoliths forming the longitudinal and transverse joint were provided
with keys and these joints were grouted to make the dam act as a single integrated structure.
The dam has an important feature as an over flow spillway 260 ft wide which is centrally
located in the body of the dam with a discharging capacity of 197300 cusecs at El. '1685 ft. having four
number Radial gates (50 x 47.5 ft). Sixteen number River outlets have also been provided in the
spillway portion arranged in two tiers at El.1320 ft and E .1420 ft eight numbers on either side of the
central training wall. The purpose of River outlets is to meet with the day to
Reviewed and Approved By
il
]qsued By
\\\&hrdnD'Director Desion
d^{I
Prepared By
BHAKRA BEASMANAGEMENT
BOARD
BHAKRA I{ANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
TITLE: EMERGENCY ACTION P'ANFORHANDLING SITUATION ARISING OUT OF
HYDROLO GICAL FAILURE S, EARTHQ UAKESoR orHERS. Ceftf-ollcO
Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02Page.2 of 66Page Revision No. 0
,)
day irrigation & power requirement, disposal of floods and passage of density Currents.
Further ten number welded plates steel penstocks are also located five each on either side of
the spillway in non over flow section in order to feed two number power plants on d/s of Bhakra Dam
each on left & right side These power plants have the generating capacity of 540 MW (10g x 5) and
785 MW (157x5) respectively. For detail refer Annexure-ll salient features of the project.
1.1 EMERGENCY AGTION PLAN
The emergency action plan is a necessity for the size & magnitude of a project like Bhakra
Darm due its location in the seismically active zone ancl its typical geology, the potential emergency
may arise out of any situation involving flood due to breach or other structural failures as well as major
floods without a breach included. other unusual situations may also arise by sudden overtopping of
the dam, due to existing spillway capacity falling short despite the best efforts to route the floods.
Another factor involves which may make the stability of the dam questionable r.e. unusual seepage or
piping through the dam or excessive uplift pressures beneath the dam body, sliding of the side slopes
/ embankments, earthquake damages and land slide generated waves within the reservoirs,
equipment mal functions, foundation failure, and sabotage. Any one of these factors can trigger the
disaster which may disrupt normal human life in its established social traditional and economic
system The destruction of environment caused by extra ordinary natural phenomena or human
created
ASE-I OKReviewed and Approved By
Director Design
BHAKRA BEASMANAGEMENT
BOARD
TITLE: EMERGENCY ACTION PLANFOR. HANDLING SITUATION ARISII{G OUT OF
TIYDROLOGICAL FAILURES, EARTHQUAKES ORi 'J
5i {.:r+.,SlCr orHERS. COntfOlled
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
Doc. No.BHDIDESIGry/EAP.Date:12-07-2419Issue No. 02Page.3 of66Page Revision No. 0
hazards results into hardship and suffering beyond redemption unless outside help is managed to the
affected populace. A hazard happens to be a perceived event which threatens both life and property.
A disaster is the realization of this type of hazard. lt may turn out to be a disaster if proper
management and mitigation measures are not ensured to alleviate the suffering of the people of the
affected area. Emergency action plan in its ambit identifies potential emergency condition at a dam
and specific pre planned actions to be followed to minimize property damages and loss of life.
Broadly the causes responsible for such type of disasters may be classified as.
(a) Hydrologic: such as flooding due to large releases, seepage slumping, piping, embankment
cracking, embankment deformation, movement of concrete section (sliding or overturning), settlement
failure of spillway gates or supporting structures, outlet works, equipment malfunctions etc.
(b) Earthquake: This natural cause which may have impact on the structural stability of the dam
resulting into embankment piping, cracking and movement of concrete section.
(c) Other events: These include equipment failure security/criminal action, structural fire, land
slide, wild fires, storm of extreme intensity, cloud burst and sabotage etc.
Emergency action plan requires the project authorities to moderate or alleviate the problems at
the dam. lt includes procedures and information to assist the authorities in issuing early warning and
notifications messages to responsible
Reviewed and Approved By
Director Design
Prepared By n lssued Bv
U**so( *,v
downstream ln this E.A.P. potential emergency or imminent emergency arising due to hydrologic
reasons as classified earlier, has been considered as most likely occurrence.
1.2 Notification FIow Chart: - N,F,C. is a very important component of the E.A.P. which may
meet emergency conditions.
(a) Failure is imminent or has occurred.
(b) Potential emergency situation has developed or is developing
(c) Flood is occurring or is expected
The Bhakra Dam was commissioned and dedicated to the nation on22nd October, 1963 by our
first Prime Minister Pt. Jawahar Lal Nehru. The dam since its commissioning has been run so far by
tlre ever vigilant administratron. ln the past the emergencies arising out of the situations have been
managed deftly and efficiently. The uncertainty about the future requires the same vigilance and keen
watch dog behavior as an emergent need of the times to come. The efforts in the past have been
fruitful as the running and the maintenance of the project has been carried out according to the
provisions of the codes and procedures as laid down in the operation and maintenance manuals.
Despite all these good input and stringent efforts these may fall short of the likely natural
aforesaid unprecedented events. ln order to cope with the future emergencies and the statutory
compulsions of the present time, four number alert level situation developing very slowly to situation
of inevitable catastrophe are summarized as below and find mention at Arrnexure-lll Also four
number N.F.C.
,.-'.,,
BI{AKRA BEASMANAGEME,NT
BOARD
Pi;p;ied By- -AsE-t fi
\sylssued BySE/l-1Q(MR)
TITLE: EMERGENCY ACTION PLANFORIIANDLING SITUATION ARISING OUT OF
HYDROLOGICAL FAILURBS, EARTHQUAKES,ORorHERS. COftfOIoriroll';e
Reviewed and Approved ByDirector Design
BHAI(RA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
Doc. No.BHD/DESIGN/BAP-Date:12-07-2019Issue No. 02Page. 4 of 66Page Revision No. 0
01,!*-th'
Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02Page. 5 of 66Page Revision No. 0
covering the afore mentioned situations have been incorporated as annexure -lV so as to pass on the
information about the developing situation to all responsible and concerned officers. The narrative
information supplementing the flow chart of different situation as above has been provided and
appended at annexure-V with detail. Sample warning messages explicitly giving a brief specific
situation are also attached as annexure-Vl. An updated copy of the NFC is posted in all the offices of
the officers having responsibility in the EAP.
2.0 RESPONSIBILITIES
BBMB administration is responsible for the upkeep and maintenance of Bhakra Dam besides
two other Pro.lects on River Beas (BSL Unit -l and Beas Project Unit - ll). The duties and
responsibilities are clearly defined in respect of the different divisional engineers placed under
different controls as per org. chart at Annexure-XXXl. However in order to make emergency plan
more effectively implemented, the personnel manning the project should be aware of the
responsibilities at the time of developing inevitable or imminent situations. Such situations demand
that Executive Engineer Bhakra Dam, Xen Reservoir Management and Xen, Bhakra Mech., and Xen
Bhakra Electrical will be responsible to perform pivotal role at site of emergency on the project Above
all Executive Engineer Bhakra Dam Division would be handling the situation through the acttve
participation of the other associates being overall in charge of the Bhakra Dam including all related
vital structures. Xen, Bhakra Dam would determine and identify the triggering events which require
emergency action and ensure
BHAKRA BEASMANAGEMENT
BOARD
Prepared By Reviewed and Approved By
Director Design
f lssued Bv
L{fuff{, &
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
TITLE: EMBRGENCY ACTION PLAI{FORTIANDLING SITUATION ARISING OUT OF
HYDROJ.OGICAL FAILURE S, EARTHQUAKES
__rL
BHAI(RA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
f)oc. No.BHD/DESIGN/EAP-Date:12-01-2019Issue No. 02Page.6 of66Page Revision No. 0
TITLE: EMERGBNCY ACTION PLANFORHANDLING SITUATION ARISING OUT OF
I-IYDROLOGICAL FAILURBS, EARTHQUAKPSoR orI{ER.l COntrOUed
BHAKRA BEASMANAGE,MENT
BOARD
deputing of responsible personnel to meet such exigency. This may include incident of sabotage. ln
this case Xen, Bh. Dam Division will immediately inform Project Security Officer who will act promptly
as per his duties and responsibilities. The most likely situation expected to develop may be due to
unprecedented high floods in Sutlej catchment. He will immediately inform his high offices i.e. S.E.
Bhakra Dam Circle & Chief Engineer, Bhakra Dam as per flow chart of External Alert contained at
Annexure-lV. He will also inform Xen, Bhakra Mech., SDE Water Regulation, Xen, Nangal Dam and
others as per N.F.C. However, under certain special circumstances the duty of informing the
developing emergency or imminent emergency, the power may be delegated to SDO lnstrumentation.
ln an inevitable mishap all agencies/partner states to whom water is being supplied or the districts of
the states through which the river Sutlej runs past will be informed about the exigency well in time as
per N.F.C. The list of the Deputy Commissioners of the district through which the river Sutlej
transverses its course has been appended as Annexure- VIl.
The appended N.F.C. amply explains the route and destination to where the information of the
mishap is to be passed on.
It may also be made imperative and followed in true sense that the flood discharging
facilitation/installations are manned by the efficient and the most experienced operators and the
procedures for their operation during such hours of emergency are strictly carried out in accordance
with the provisions of the O & M. The brief sequence of operation of the gates at Bhakra Dam and
Nangal Dam may be depicted and the staff be made well aware
Prepared By Reviewed and Approved By
Director Design
ti-!"4-.]&1iry'hr*f,,-
BHAKRA BEASMANAGEMENT
BOARD
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02
Page.7 of 66Page Revision No. 0
TITLF: EMN,RGENCY ACTION PLANFORHANDLING SITUATION ARISING OUT OF
HYDROLOGICAL FAILURES, EARTHQUAKTSoR orHERs. COntrolled
of it. Xen, Nangal Dam would ensure on the reception of imminent emergency flood situation
information that all lhe24 nos. bays of Nangal Dam are, operated at the notice of shortest period of
time with the help of departmental work force or contracted work force. The periodic seminars or
instructive training sessions may also be made part of emergency plan. This will go a long way in
handling the emergency situation aptly.
ln an eventuality of grim flood situation such as inundation which may threaten the township or
other populated areas upstream or downstream of Bhakra Dam, Xen, Bhakra Dam would notify
promply to all departmental and civil authorities with the due approval of high authorities of BBMB as
per N.F.c. having concern with the cropping up situation. This also includes peripheral districts on the
rim of the reservoir (such as District Una & Bilaspur of Himachal Pradesh). The list detailing the
contact numbers of various villages Sarpanches and N.G.O.',s upstream and downstream of Bhakra
have been appended as Annexure -Vlll to X'
2.1 RESPoNSIBILITY FoR EVAGUATIoN, RESGUE, RELIEF;
To grapple with the unprecedented situation effectively, Chief Engineer, Bhakra Dam who is a
project head would act swiffly on the basis of precise and accurate feed back information supplied by
the s.E. Bhakra Dam circle, s.E., Nangal Mechanical circle and their under associate team members
and ensure minimum panic amongst his team officers and deploy the resources at his command to
tide over the situation and have all the possible help by notifying
Reviewed and APProved BY
Director,Design
I]I]AKRA t]BASMANAGEMENT
BOARD
District Magistrate who is the Chairman of the Co-ordination Relief Committee Ropar and call help
from lndian Army, Indian Navy and lndian Air Force (contact numbers appended as Annexure- Vll)
through Chairman Office. Other central agencies such as I"M.D. CWC etc. will have to be informed as
per N.F.C. as they have also the responsibility to discharge by issuing warning messages through
various media such as audio, visual & print media etc. (list attached as Annexure--X). Above all
another important action to be taken would be to get the water releases from Dehar Power Plant and
Kol Dam stopped that discharges into river Sutlej through Chief Engineer, B.S.L. Sundernagar as well
as to Chief Engineer/System Operation, Chandigarh.
Further to cope with the developing/imminent / emergent situation such as unprecedented high
floods as above, the officers enlisted below in various teams would study/handle the situation
promptly without any hitch or hesitation. They would be responsible to act with alacrity on
identification and declaration of emergency of external alert level (Red) in consultation / approval of
high officers. A siren will be sounded in the presence of S.E. Headquarter (EAP co-ordinator) S.E.,
B D.C. and S.E., N.M.C. The mode of sounding siren will be as follows:
(a) ln case of emergency, the duration and number of sound blasts will be 2 minutes BLOW 30
seconds BREAK for 4 times.
(b) For all clear signals it will be continuous siren for 5 minutes which will be sounded upon the
direction of Chief Engineer, Bhakra Dam after the emergency is over.
l
l
Prepared By
ASE-I
Reviewed and Approved By
Di'ffi"'ion
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02
Page.8 of66Page Revision No. 0
fITLE: EMERGENCY ACTION PLANFORHANDLING SITUATION ARISING OUT OF
HYDROLOGICAL T'AIr,URES, EARTI{QUAKES ORorHERS. COntf&_
BI{AKRA BEASMANAGEMENT
BOARD
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
Doc. No.BHD/DESIGN/EAP-Datezl?-07-2019Issue No. 02Page.9 of66Page Revision No. 0
TITLE: EMERGENCY ACTION PLANFORHANDLING SITUATION ARISING OUT OF
TIYDROLOGICAL FAILURES, EARTH QUSESoR orHERS. COntrOlled
*.1'$.'L
It is also added that the sirens installed at Bhakra Dam and in Township area would sound
simultaneously at the time of declaration of the emergency. The staff operating the sirens need be
made well conversant of the emergency sounding mode as described. The operation of the alarms
will be checked periodically. lts proper functioning will be done and confirmed by testing annually
when the EAP is reviewed every year.
Xen Bhakra Dam will monitor the situation with a precise period of time and continuously
informing s.E. (B.D.C) and s.E. (N.M.C.). Different set of teams have been constituted with the aim of
meeting the challenging situations
2.1.1 Team at Dam site for rescue & evacuation operation
XEN BHAKRA DAM(TEAM HEAD)1.SDO lnstrumentation2.SDO Road & ColonY3. SDO, S,O.S.4.Chief Fire Officer5.SDO Horticulture
orvru. i xeru RM/SR DlVlSloN
1.SDO, BSR2.SDO Silt SurveY3 ARO Silt
XEN BHAKRA MECHDIVISION1.SDO,Pt. lnstallation2.SDO Gates Gearing3. SDO Field Sub Divn.
ffigetting out of control and in which case the flooding becomes
inevitable (as per case IV of Notification flow chart), this team would arrange with all their mental
resources at their command and ensure the evacuation, rescue & relief of the persons entrapped
inside/outside the dam or in any surrounding area. The team with their under associates would:-
(a) Rescue and transport the casualties if any on the priority basis to first aid centre'
lssued BY
Q,nLt*, -Reviewed and APProved BY
Director
&{
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
Doc. No.BHD/DESIGN/EAP-Date:12-(17-2019Issue No. 02Page. 10 of66Page Revision No. 0
TITLE: EMERGENCY ACTION PLANFORHANDI,ING SITUATION ARISING OUT OF
I{YDROLOGICAL FAILURES, EARTHQUAKESoR orHER.l CoitiO[ed
BI-IAKRA BE,ASMANAGEMENT
BOARD
Transport all workers in the affected areas to the assembly point on premeditated place.
Take roll call of the persons assembled after evacuation.
The responsible persons as nominated by the Xen shall pass on the information in respect of
absenteeism/missing persons to the control room at site.
Will put in all the efforts with the help of fire fighting staff, divers or other present personneI of
army/navy at site.
They will also shoulder the responsibility as delegated by the SE (BDC) and SE (NMC) and
Chief Engineer, Bhakra Dam.
They will maintain daily diary of events and work progress & submit report in this regard to
higher officers as well as to the established control room.
They may use the facilities available at each control room as per annexure --XI
.Ensure that lists of persons in dam area working under XEN RM&SR, XEN, BDD, XEN
Bhakra Mechanical and Electrical Division is readily available with them as detailed at
Annexure XXV|ll, XXIX & XXX.
2.1.2. Team at Nangal Township and adjoining area for rescue and evacuation operation.
ln addition to above if the danger of the flood looms large on the
Area downstream Bhakra Dam including Nangal Township and adjoining areas,
- _-- PrepareO gy Reviewed and Approved By
ASE.I
(a)
(b)
(c)
(d)
(e)
(0
(g)
(h)
irector Desio
il'-P\
Doc. No.BHD/DESIGN/EAP.Dile:12-07-2019Issue No. 02
Page. ll of66Page Revision No. 0
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
BHAKRA BEASMANAGE,MENT
BOARD
TNLE' EMERGENCY ACTION PLANFORHA.NDLING SITUATION ARISII{G OUT OF
HYDROI,OGICAL FAILURES, EARTHQUAKESoR orHERs.controlled
then the under mentioned team of the officers with their under associates would act on war footing'
TEAM AXEN Building Construction & TownshiP Division
1.SDO Estate2.SDO Enforcement3.SDO Water SuPPIY
TEAM B
XEN HYDROLOGY1.A.D.E, Regulation2.A.D.E., HYdrologY3. A.R.O., Meteorol
holeofthetownshipandDubettacolonyareaetc
team A would take care of rescue and evacuation operations for an area lying on the right side of the
road leading from singh sabha Gurdwara to BBMB Workshop whereas team B would be looking after
therescue&evacuationoperationsleftofthesaidroad,
(a)Theywillberesponsibleforattendingtherescueandevacuationoperationsofthe
entrappedpersonsonprioritybasisandprovidefirstaidormedicalaidimmediately
throughtransportingthevictims/orcausalities,ifanytothenearbymedicalcentre'
(b)Theevacuatedpersonswillbetransportedtothesheltersathigherelevation(plan
attachedatAnnexure-Xll.wheretheaffectedpersons
Reviewed and APProved BY
Director De
{
Prepared BY
ASE-I
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02
Page. 12 of66Page Revision No. 0
TITI,E: EMERGENCY ACTION I,LANITORHANDI,ING SITUATION ARISTNG OUT OF
I{YDROLOGICAL FAILURES, EARTHQUAKES OR
i''' : : 'THERS' controlleil
I]HAKI{A BEASMANAGEMENT
BOARD
may be stationed with temporary housing such as tents, nearby school buildings or religious
places such as Mandir & Gurdwara etc.
(a) They will contact the local NGO's and Village sarpanches as per the list attached at
Annexure - lX for having immediate help of men and material during the period of such
emergency. This may also include food and clothing etc.
(b) They will also collect the information regarding the loss of human life, live stock and loss to
the housing etc. They will pass this information to the control room established in the
colony at safe and easily accessible pre planned place.
(c) The routine roll call of the personnel deployed for such operations shall be made invariably
in assembly point. Absenteeism/missing persons will be reported to the control room and
to the higher authorities also.
(d) They will also keep contact daily with the high offices for fresh instructions as well as seek
their guidance if need be.
(e) They will also make efforts to keep the water supply system running if possible or
otheruuise make alternate arrangement for water supply to ease the hardship of the
sufferers of the area.
(0 They will also inform various agencies drawing water for different purposes from the
Nangal Pond about the inevitable flooding situation. The contact numbers of such
agencies have been listed as per attached Annexure--Xlll.
Prepared By
ASE-I
Reviewed and Approved By
Director Design
Pase Revision No. 0
Doc. No.BHD/DESIGN/EAP-Dztel2-07-2019Issue No. 02
Page.13 of66
BHAKRA NANGAI, PROJECTINTEGRATED MANAGEMENT SYSTEM
BHAKRA BEASMANAGEMENT BOARD
rtrt Et ntvtnnGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF ITYDROLOGICAL
FATLURE s, EARTHQUAKE s o"8lT_Ettfu a* o
(i) They will maintain daily diary of events and work progress and submit report in this regard
to the higher officers as well as to the established control room'
0) They may use the facilities available at each control room as per Annexure- Xl'Thay may
contact the NGO,s and village sarpanches as per Annexure-lX
2.1.3 Team for maintenance of electric supply at Bhakra and
Nangal TownshiP area
XEN, BHAKRA EICCTRICAL DIVISION
1. SDO, Bhakra Electrical
2. SDO, Nangal Electrical
3. SDO, Construction (BC&Township Divn )
4. SDO, R&M Sub Division
5. SDO, P.M & T Sub Division.
The team would make efforts to keep the electric supply system in the emergency
running both at Bhakra area as well as in the downstream area including Nangal
Township.
They will make arrangement to provide temporary lights for such an emergency
period wherever needed.
The routine checkup / roll call shall be exercised on particular pre planned
assembly point. The absentees or missing persons would be immediately reported
to the nearest control room.
They will organize safe shut down wherever required'
(a)
(c)
(b)
Reviewed and APProved BYPrepared BY
. .... .'',,;.
BHAKRA BEASMANAGEMENT BOARD
Doc. No.BHD/I)ESIGN/EAP-Datezl?-D7-2019Issue No.02 ,,*",$fi[IPage. 14 of66Page Revision No. 0
(a) They will organize all support services like power, temporary lighting and operation
of the water pumps.
(b) They will also help in dewatering inundated areas in dam or in the township area.
(c) They will also keep contact daily with the high officers for fresh instructions as well
as seek their guidance if need be.
(d) They will maintain daily diary of events and work progress and submit report in this
regard to higher officers as well as to the established control room.
(e) They may use the facilities available at each control room as per Annexure- Xl.
They may contact the NGO,s and village Sarpanches as per Annexure-lX
2.1.4 Security Team for Bhakra Dam & Township Area.
Project Security Officer (DSP)
'1 . lnspector Security (ClD)
2. Sub lnspector
3. A"S.l. with trained Security personals
This security team would meet the challenge of imminent emergency or inevitable flooding
situation through their efforts and try to secure the emergency operations from all angles. For this it
will be more worthwhile that Project Security Officer establish two teams i.e. one for Bhakra Dam area
. and other for Nangal township area and keep a close watch on the ongoing emergency operations.
Broadly they will be responsible to:
P repare
ASE
BIIAKIIA NANGAL PROJBCTINTEGRATBD MANAGBMIINT SYS'TEM
TITLE: EMERGENCY ACTION PI,ANFORTIANDLING SITUATION ARISING OUT OF'
HYDROLOGICAL FAILURES,EARTIIOUAKBS OR OTHERS.
Project Security Officer
1. lnspector Security
2. Sub lnspector
3. A.S.l. with trained Security personals
Reviewed and Approved By
Director Design
lssued By
hft{,fu
lMtu-*\ts'e***.5r
BHAKRA BEASMANAGEME,NT BOARD
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
Doc. No.BHDIDESIGN/EAP-Dilezl}-07-2019Issue No. 02
Page. 15 of66Page Revision No. 0
-TITLE: EMERGENCY ACTION PLANFORHANDLING SITUATION ARISING OUT OF
HYDROLO GI c AL FAJ|HIR U$ffrtlsit.
(a)
(b)
(c)
(d)
(e)
(f)
Man all projects entrY Points
Ensure proper access to the emergency services
Prioritize the vehicle movement to the emergency site
control the traffic and divert through alternative routes.
Ensure no unauthorized person is entry into the emergency site'
To permit with minimum delay the entry of authorized personnel and recognized outside
agencies, vehicles etc. involved in the emergency operations who come to help'
Anyotherresponsibilityasentrustedbythehighofficers.(g)
2.1.5 COMMUNICATION TEAM FOR ESTABLISHING COMMUNIGATION NETWORK
DURING EMERGENCY
S.D.O.HydrologY
Junior Engineer Design Directorate
Wireless OPerators = 3 Nos'
This team would look after the maintenance of communications system during emergency on
the project site or in Township area. They will be responsible for the following'
(a) To maintain communication network in working condition and its use at the call of an
emergency.
(b) To keep ready suitable staff to act as messengers in the event the communication systems
fails due to anY reason.
Reviewed and APProved BY
Director Design
"j
BHAKRA I{ANGAI, PRO.IECTTNTEGRATED MANAGEMENT SYSTBM
Doc. No.BHD/DESIGN/BAP-Date:12-07 -2019Issue No. 02Page. 16 of66Page Revision No.0
TITLE: EMERGENCY ACTION PLANFOR" IIANDLING SITUATION ARISING OUT OF
HYDROLOGICAL FAII,URES, EARTHOR OTHE
(a) To ensure timely repair / maintenance if the normal communication system goes out of order.
(b) To help ensure timely access to the fire brigade and other emergency services.
(c) To be ready for discharging any other duty as assigned by the higher officers.
(d) To maintain daily diary of events and work progress & submit report in this regard to higher
offices as well as to the established control room.
2.1,6 MEDICAL ASSISTANCE TEAM;
PRINCIPAL MEDICAL OFFICER BBMB HOSPITAL NANGAL
: 2. Dispensers & others paramedical
staff of Canal Hospital, Nangal
The medical aid team would handle the most delicate and important job assignment of
extending immediate medical assistance to the victims during the crucial hour of emergency at dam
site or in Township area. They will be responsible to.-
(a) set up first aid post at emergency site on pre meditated site as decided by the Xen, Bhakra
Dam Division at Bhakra and by the Xen, Township in the Colony area.
(b) Make available first aid equipments and medicines.
(c) Co-ordinate shifting of casualties to nearby Medical Centers/Hospitals"
i trepared By
i nsr-r CReviewed and Approved By
Director pesign
.-\ -lssued Bv
L\$#f ,*kl
1SMO2. Dispensers and other paramedical
staff of Canal Hospital, Nangal.
BHAKRA BEASMANAGEME,NT BOARD
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
Doc. No.BHDIDESIGN/EAP-Date:72-07-2019Issue No. 02
Page.17 of66Pase Revision No. 0
rTTiN' EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF ITYDROLOGICAL
FAILURBS, EARTHQUAKES "" ffiHttbtbo
(d) Arrange ample .sr{ingfbfirv,ehicles for the carriage of the casualties through Xen, Bhakra
Mechanical.
Keep liaison with other Govt. and non Govt. hospitals/dispensaries in the nearby area.
To maintain daily diary of events and work progress and submit report in this regard to higher
officers as well as to the established control room.
They may use the facilities available at each control room as per Annexure - Xl.
CONTROL ROOM
As an important component of E.A.P. two numbers control rooms will be set up each at Bhakra
Dam site as well as in Nangal Township area for monitoring & co-ordinating the actions of various
agencies involved in discharging their duties during an emergency.
Controt Room at Bhakra field office at RL
1400
Control Room at Bhakra Beas Training centre
NanqalTownshiP.
SDE-ll, PongDesign1. SDO Discharge2. ARO Concrete Lab.3. SDO Stock Verification
S.D. E- lll, BSL Section1. ADE of SDE-ll Section2. P.R.O.3. SDO Rlv. Sub Divn.
SuPervision / guidance of S'E
Headquarter Nangal who will ensure the smooth functioning and keep liaison with different
agencies operating at that time. The control room would be well equipped with all types of
information in relation to the
(e)
(f)
(g)
2.2
Reviewed and APProved BY
Director Design
Prepared By
ASE.I
BFIAKRA BEASMANAGI]MENT BOARD
BIID/DESIGN/EAP.Date:12-07-2019Issue No. 02Page. 18 of66Page Revision No. 0
On going activities like rescue, relief operation and other reconstructions/maintenance activities
etc.
The team leader would in each case execute the work in control room round the clock in three shifts
depending upon the seriousness of the situation. ln addition to the above, they will be having a
continuous contact with l.M.D. through Xen, Hydrology for any abrupt change in weather likely to
occur in the catchment area upstream. An update will also be maintained by them by having a
continuous flow of information from the control room set up by district civil authorities.
2.3 E.A.P.Co-ordinator's Responsibility
An EAP coordinator will be responsible for EAP related activities including preparing
revisions to the EAP, if any" He will also arrange trainings & drills on EAP. S.E (Hq) has been
assigned the duties of an EAP coordinator . He is well conversant with EAP and any involved party
can contact him for any quarry regarding the plan. His contact number has been given as per
Annexure. XIV All records in respect of trainings & drills will be maintained by him separately. All the
parties will be apprised timely about any latest amendment to EAP. A copy of the same will also be
supplied to each party. Review of the EAP will be conducted by the coordinator every year on or
about the same date. In case there is no revision is necessary, a statement that the review was made
and no revision to the plan was required has to be provided to the recipient of the original EAP.
2.4 Approval of the Plan
I}I{AKRA NANGAL PROJECTINTBGRATED MANAGEMENT SYSTI.]M
TITI,E: EMERGENCY ACTION PLAN}-ORHANDLING SITUATION ARISING OUT OI.-
HynnoLoGICAL FAILURES, EARTHeIIAKES onOTHERS.
i
i
Reviewed and Approved By
Directpr D($ign
BHAKRA BEASMANAGEMENT BOARD
BHAKRA NANGAL PROJBCTINTEGRATED MANAGEMENT SYSTEM
Doc. No.BHD/DESIGN/EAP-Date;12-07-2019Issue No. 02
Page. 19 of66Pase Revision No. 0
Uff,nt EUERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF ITYDROLOGICAL
FAILURES, EARI'HQUAKES OBOTHERS.t Confrolled-
The plan should be duly approved by all the parties involved or supposed to be involved in its
implementation at the time of any mishap on Bhakra Dam assuming thereby that all parties involved
are aware of and fully agree to the roles assigned to them during such emergency. Accordingly, the
signatures of all the related parties have been appended as Annexure -XV. declaring thereby approval
of the plan.
3.0 EmergencY Procedures
3.1 Emergencyidentification,Evaluation&Glassification
It is mandatory on the part of Executive Engineer, Bhakra dam to determine and identify
situations that require an emergency action. Therefore establishment of procedures for timely
recognition are imperative. To serve as a guide at that time following emergency identification,
evaluation & classification procedure elemehts are detailed below:
3.1.1) A listing of the conditions or events which could lead to or indicate an existing or potential
emergency. situations involving flood emergencies due to a breach or other structural
failure as well as a major flood without a breach should be included. Unusual situations
such as those caused (a) by overtopping of a dam due to insufficient spillway capacity
during large inflows to the reservoir (b) by seepage or piping through the dam over long
internal conduits (c) slope embankment slides (d) earthquake damage & (e) landslide
generated waves within the reservoir. Hydraulics, hydrodynamics, hydrology, sediment
transport
Reviewed and APProved BY
rector De
{
Doc. No.BHD/DESIGN/EAP-Dzte:12-07-2019Issue No. 02Page.20 of66Page Revision No. 0
Mechanics and geo- technical aspects are all involved in breach formation and eventual dam
failure. The prominent causes can be listed as follows.
BHAKRA BEASMANAGEMENT BOARD
1)
2)
3)
4)
5)
6)
7)
B)
e)
Extreme storm
Landslide
Earthquake
Overlopping
Structural damage
Piping
Equipment malfunction
Foundation failure
Sabotage
The above unusual situations can be divided into 3 categories.
a) Hydrologic: These are related to flooding due to large releases, seepage, slumping,
piping, embankment ,deformation, embankment overtopping, movement of concrete
section cracking, embankment (sliding or over turning) settlement, failure of spillway gates
or supporting structures., spillway & outlet works releases, equipment malfunction, etc.
Earthquake: These are related to impact of earthquake at dam which could lead to
embankment piping, embankment cracking, embankment deformation, Iiquefaction and
movement of concrete section, etc.
Pre
b)
pared By
ASE-I A
_wReviewed and Approved By
Director Design
,h-?I
BHAKRA NANGAL PROJECTTNTEGRATBD MANAGEMENT SYSTEM
TITLE: EMBRGENCY ACTION PI,ANFORHANDLING SITUATION ARISING OI]T OF
HYDROLOGICAL FAI LU RES. EARTHOI]AXES ORorHERS. controlied
1:!,ftiriru'rq**5#
":-::'i.,;.:i;"
RHAKRA BEASMANAGEMENT BOARD
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
Doc. No.BHD/DBSIGN/EAP-Datezl2-07-2019Issue No. 02
Page.2l of 66Pase Revision No. 0
rTTiT' EMERGENCY ACTION PLANFOR HANDLINGsrruATIoN ARISTIIG OUT OF ITYDROLOGTCAL
F AILURE s, E ARrH QUAKE s tudilfrHilefl_
c) All other events: These are related to hazardous material spills/ releases, equipment
failures, security / criminal actions, fish / wildlife impacts, wildfires, structural fires,
landslldes, extreme storm, sabotage, etc. One or more of the above unusual situations will
initiate declaration of an emergency for internal alert or external alert'
l.1.Zl A brief description of the means by which potential emergencies will be identified, including
the data & information collection system, monitoring arrangements, surveillance, inspection
procedures and other provisions for early detection of conditions indicating an existing or
potential emergency. Emergency events occur with unusual situations varying degrees of
severity and predictability. An emergency may develop gradually and be steadily monitored
providing ample response time. conversely, an emergency may develop suddenly
requiring immediate emergency response to prevent devastating loss of life or impacts to
structures or the environment. The following definitions are used to classify emergency
events according to an ascending and progressive order of severity to which the dam
downstream or off-site population, structures or environment are threatened. Condition
may dictate that situation is classified as imminent without passing through the less severe
situations. A smooth transition should occur, if the situation is classified as "developing"
prior to "imminent".
Reviewed and APProved BY
Director D-esign
J-4,l
fi,,,,
BIIAKRA BEAS ,,
'
MANAGEMENT BOARD
BHAKRA NANGAI, PROJECTINTEGRATED MANAGEMEN'I SYSTT]M
f)oc. No.I}HD/DESIGN/EAP-Datezl2-07-2019Issue No. 02Page.22 of 66Page Revision No. 0
TITI,E: IiMERGENCY ACTION I,I,ANFOIIIIANDLING SITUATION ARISING O1]T OT.'
iiyilxor,oGrcAL FATLTTRES, EARTr{euAKESOR OTHERS.- ^-^llol
Assessment of degree of seriousness of unusual situation is required. lt may be classified
as the Blue, Yellow, Orange and Red level alert according to their seriousness.
Guidelines lie mainly in the interface between the internal and external emergency planning,
being the two main aspects of the following:
a) Definition of alert levels: lf an incident happen with the dam or problem arises
related with the dam over its foundations or with landslides into the reservoir, earthquakes,
adverse meteorological situations or any other alert must be given to civil protection system.
The gravity of the problem may obviously vary with the situation, but in order to assure that all
the entities involved in emergency actions are behaving in accordance with the situation, the
alert levels need to be previously defined, and must be the same for the internal and external
emergency plan of each dam.
These alert levels are established in colors, from Blue, the lowest level that corresponds to a
routine or normal situation, to Red, corresponding to a serious or catastrophic situation.
The alert levels defined are presented in Annex-lll. lts underlying philosophy relates the gravity
of dam problems with the expected impacts in the downstream valley and the likelihood of the
total dam rupture.
b) Alert and Warning systems: When facing
the dam must judge the corresponding alert level
order to allow the development of the
problematic situation, the entity exploring
and notify the civil protection system, in
Prepared By Reviewed and Approved By
Doc. No.BHDIDESIGN/BAP-Datezl}-01-2019Issue No. 02
Page.23 of66Revision No.0
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
BHAKRA BEASMANAGEMENT BOARD
ffiY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL
FAILURES, EARTHQUAKES OR OTHERS.
necessary actions, according to the situation'
lf the dam rupture is very likely (orange alert level) or imminent (red level) give" external alert"
signal and the entity exploring the dam must warn population downstream of the dam ln
orange level, the warning indicates people to be ready for evacuation and in red alert to
evacuate quicklY.
Given that a dam rupture can be very sudden, it is assumed that people leaving up to a certain
distance downstream of the dam have to evacuate by their own means, with no time to wait for
civil protection helP.
3.1.3 procedures, aids, instructions and provisions for interpreting information and data to
assess the severity and magnitude of any existing or potential emergency should be clearly
defined. The tabre covering different emergency situations demanding entirery separate
approach to tackle each case is given as per Annexure-lll'
3.2 NOTIFICATION PROCEDURES
A list of all the persons which includes their name & position, office & home telephones
and who are to be notified in the event of any emergency including alternatives is required to
be attached in Emergency Action Plan. The same has been placed at Annexure- XIV & XVI'
The list indicating who is to make call to whom & in what priority has been attached as
Annexure.S.E,(Ho.)hasbeenassignedthedutyofspokespersontodisseminateinformation.
The news media including Radio, Television and newspapers should be utilized to the extent
available & aPProPriate.
lssued Bv
Q(hd,,4-Reviewed and APProved BY
Director Design
ry
Doc. No.BI{DIDESIGN/EAP-Date:12-07-2019Issue No. 02Ptge.24 of 66Page Revision No. 0
BHAKRA NANGAL PRO.TECTINTEGRATED MANAGEMENT SYSTBM
'IITLE: EMERGENCY ACTION PLANT'ORHA.NDLING SITT]ATION ARISING OUT OF
r{YD Ro L o G r c A L F A r
lYrtR r$offi?tmm
i)
ii)
iii)
iv)
BI-IAKRA BEASMANAGEMENT
BOARD
I Prepared By
The contact numbers of media persons are enlisted as per Annexure- X. The use of media
should be pre planned to the extent possible. Given below is an example of news releases
that would be most effective for each possible emergency situation.
The information which should be conveyed during notification can be given in the
following prescript message (for use by designee when making notification).
This is (name, title, agency) monitoring, Bhakra Dam
The date is and time is
The conditions at Dam are
We will notify you if the conditions at the canal change. We will give you the next briefing at
hours or sooner.
For further information contact at BBMB control room telephone No
This message will be sent to you in the text form of fax or other.
3.2.1 EVENT REPORT
The in-charge shall ensure that the following report forms are to be used when recording
various emergency situations and unusual occurrences.
orv)
vi)
nASE-I I /, o)k/
NI--t*___ ___
Reviewed and Approved By
o').1i"''n'
BHAKRA BE,AS
MANAGEMENT BOARD
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02
Page.25 of66Pase Revision No. 0
rTtT-N' EMERGENCY ACTIOI\ PLANFOR HANDLINGSITUATION ARISING OUT OF TTYDROLOGICAL
FAILURES, EARTHQUAI(ES OR O-THERS.Carfralled
ii)
Emergency Event/unusual occurrence Report for reporting emergency events and unusual
occurrences other than earthquakes, bomb threats and oil and hazardous spills. Form - '1'
Earthquake Damage Report - for reporting earthquakes - Form -2.
iii) Bomb threat Report - for reporting bomb threats - Form-3.
These forms have been attached as Annexure - XVll"
ln addition all persons involved including their names title & phone numbers and all
agencies notified should be documented separately during such mishap'
All corrective actions to be taken at site will be decided by S.E. (BDC) Nangal and Xen,
Bhakra Dam joinly. lf necessity arises Director Design, Engineers having expertise in the field
may also be consulted. The contact numbers of experts have been given in attached
Annexure- XVlll
Sanctions of funds required to meet such an exigency will be accorded by Chief Engineer,
Bhakra Dam in anticipation of sanction of estimate'
It is desirable for all officers receiving reports in respect of tackling situations and duties
assigned to record / maintain diary and messages be recorded if possible'
Photographs are also essential to provide complete documentation of the event'
The attendance at site should be24 hours a day during occurrence of such emergencies'
.{spued By r
WffiMR)FReviewed and APProved BY
Director Design
WI
BI.IAI(RA BEASMANAGEMENT BOARD
Doc. No.BHD/DESIGN/EAP.Date:12-07-2019Issue No. 02Page,26 of 66
Page Revision No. 0
BIIAKRA NANGAL PROJECTINTEGRATED MANAGBMENT SYSTEM
TITLE: EMERGENCY ACTION PLANFORIIAI{DLING SITUATION ARISING OU'T OF
.'HYDROLOGICAL FAILURES, EAR'IHQUAKESOR OTHERS.
. Xen, Bhakra Dam Division will ensure that a formal status report for the dam facility is
developed during emergency event which contains the date, time, location of observation,
water level in the reservoir, inflows / outflows and other related parameters.
4.0 PREVENTIVE ACTIONS
preventive actions refer to pre-planned and emergency action required to be carried
out for preventing failure of dam embankment / breach of any emergency situation likely to
occur and to minimize loss of life & property. ln case of identification of emergency condition
as enlisted in Table on Annexure--lll the residents of the area likely to be affected wlll be given
warning for evacuation to the safer places without making any delay due to the procedural
notification. Xen, Bhakra Dam or his representative may take this step promptly after
identification of situation. The several types of preventive actions include:-
4,1 SURVEILLANCE
There should be round the clock surveillance of the dam and its appurtenants and on
the rim of reservoir (left & right) upto reasonable distance during the rainy season to attend to
any emergency situation if it happens to occur. For this, the posting of special observer of high
experience and keen observation is an important requirement of EAP during high flood period.
To ensure that the whole system (including civil structures & mechanical installations) is being
maintained well upto
Prepared
ASE.I
Reviewed and APProved BYBy
irector D
4esrgn
BHAKRA BEASMANAGEMENT BOARD
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
Doc. No.BHD/DESIGN/EAP-Dile:12-01-2019Issue No. 02
Page.27 of 66
Pase Revision No. 0
Trrr.nr EMERGENCY ACTIoN PLANFoR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL
FAILURES, EARTHQUAKES OR OTHERS.Con{rolled-
' nii .
satisfactory level, the repair maintenance must be carried out as per requirement of o & M of Bhakra
Dam. ln addition it must be ensured that maintenance and upkeep of different components is carried
out as enlisted in Annexure - XIX attached with this document and it will be only possible through
deployment of well procedure conversant and trained staff. The list of such persons should be
displayed on a photo frame mounting at convenient safe places at dam site and list of local telephone
numbers inside the dam & outside the dam area is appended as Annexure- XXV|ll & XXIX. lt will be
updated from time to time for any change.
4.2 ACCESS TO THE SITE
It must be ensured that primary and secondary routes to site of emergency are well
maintained and site is easily approachable during the emergency hours. Means of access to site
should be clearly defined in case of emergency situation when it is urgently required to arrange for
reconstruction activities. A layout plan of the area showing alternative routes also for easy approach
is attached as Annexure- XX . As an alternate route Right bank of dam easily approachable for Raipur
Madan (+ -'15 Km.) Leftbankis approachablefrom Naina Devi(+- 18 Km.)'
4.3 EMERGENCY SUPPLIES AND RESOURGES
There are certain planning and organizational measures that can help Dam personnel and
local officials to manage emergency situations more safely and effectively. These include:
4.3.1 i) MATERIAL AVAILABILITY
Material needed for emergency repair may be stock piled at a nearby convenient safe place
from where it can be used whenever there is emergent
Reviewed and APProved BY
Director Design
I]IIAKRA BEASMANAGEMENT BOARD
BHAKRA NANGAL PROJECTTN'I'EGRATED MANAGEMENT SYSTEM
Doc. No.BHD/DI]SIGN/EAP-Date:12-07-2019lssue No. 02Page. 28 of 66Page Revision No. 0
TITI,E: EMI]RGENCY ACTION PI,ANF.ORHANDLING SITUATION ARISING OUT OF
HYDROLOGICAL FAILT]RBS, BARTIIQUAKES
need for small quantum emergency jobs. For major emergency need bulk supply sources be before
hand identified and their timely supply has to be ensured by Xen, Bhakra Dam Division. Material such
as earlh or sand gunny bag be kept ready in near vicinity of the dam for their immediate use.
4.3.2 ii) MACHINERY EQUTPMENT AVATLABTLITY
The different types of machinery required for carrying out different activities during course of
reconstruction has been mentioned in attached Annexure - XXl. Some machinery has been stationed
permanently at workshop R.L. 1400 ft to meet with any emergency along with operators as detailed in
Annexure- XXll. Detail of more machinery available with BBMB at other project sites such as BSL
Project, Sundernagar and Beas Dam at Talwara which can be arranged shortly is detailed at
Annexure -XXlll.
4.3.3 CONTRACTORS
lf required contractor / contractors can also be engaged at the time
of any emergency arising at Dam site likely to put the safety of structure in danger S.E. (BDC) in
consultation with Chief Engineer, Bhakra Dam will finally decide about engaging the services of
contractor/contractors immediately after inspectlng / evaluating the gravity of the situation. The list of
contractors having expertise in the field and supposed to be competent enough to handle emergency
srtuation of lesser magnitude has been appended as Annexure - XXIV along with type of machinery
available with them. The list also contains their contact numbers. However, for undertaking repair /
reconstruction jobs of high quantum, the list of
Prepared By Reviewed and Approved By
rector
{
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02
Page.29 of66Pase Revision No. 0BHAKRA BEAS
MANAGEMENT BOARD
rrrf-n: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF ITYDROLOGICAL
FAILURE s, EARTHQUAKE s o"f;ffiffobd_Very renowned firms
Annexure-XXV.
for reference & immediate contact at,i; ,.n,:i+_i+.va
4.3.4 LABOUR
The Labour required during the execution of the work will have to be arranged locally'
Xen, Bhakra Dam will make all such arrangements in shortest possible time' A list of contractors
who can make labour available has been appended as Annexure- XXVI'
4.3.5 ENGINEERS EXPERTS
During any emergency S.E. (BDC) / Xen Bhakra Dam will contact /call or request the
engineers/persons having expertise in the field. A list of persons/retiree who contributed a lot
during their service with the project has been attached as Annexure-XVlll' These persons may
prove helpful for better guidance to tackle/handle the situation promptly & properly'
4.4 CO- ORDINATING INFLOWS ON FLOWS:-
During monsoon period, Regulation Directorate officers (Director Water Regulation,
Senior Design Engineer, Water Regulation, will keep watch on the inflows at Bhakra Dam' ln
caseofhighfloodsimpinginginthereservoir,DirectorWaterRegulation/S'D'E'Water
Regulation will issue instructions to Executive Engineer, Mechanical, Division / SDo
permanent lnstallation sub Division to operate the spillway gates specifying the discharges to
be released/gate openings such that Bhakra Reservoir Elevation does not exceed El' 1690 ft
under any circumstances. SDO Permanent lnstallation Sub Division will
,^\ssqed By
tSXsffi))-Reviewed and APProved BY
Director Qesign
"P(\
BHAKRA NANGAL PRO.IECTTNTEGITATED MANAGBMENT SYSTEM
Doc. No.I}HD/DESIGN/EAI'-Date:12-07-2019Issue No. 02Page. 30 of 66Page Revision No. 0
TITLE: EMERGBNCY ACTION PLANFORI-IANDLING SITUATION AITISING OUT OI.'
HYDROLOGICAL FAILI]RES, EARTHQUAKES OR
Controlled
BHAKRA BEASMANAGEMENT
BOARD
issue instructions to his staff to open the gates accordingly as per the discharges / gate opening
intimated by Director Water Regulation / SDE Water Regulation and will confirm to SDE Water
Regulation and Xen, Nangal Dam, Xen Bhakra Dam and SDO & JE lnstrumentation. Consequently
Executive Engineer, Nangal Dam through his SDO orJ.E. will issue instructions to the head Jamadar
to operate the gates of Nangal Dam accordingly. Further, whenever the releases downstream Nangal
Dam including escapades at Lohand and Nakkian are more than 50,000 cusecs, Executive Engineer,
Nangal Dam Division, will issue the flood warnings to the officers mentioned in Annexure- XXVII
through Police Wireless system as well as through canal telegraph officers. The above whole action
will be repeated whenever the releases from Bhakra / Nangal Dam are increased /decreased to pass
the flood waters.
ln the emergency situation of Response level Orange & Red of external Alert, XEN Hydrology
will remain in touch invariably with lMD, CWC & catchment area of river Sutlej U/S of Bhakra Dam
and collect information about the floods impinging in the reservoir. He will also pass on this
i nformation to Di rectorAlVater
Regulation, S"E.(Hq), XEN Bhakra Dam & XEN, Bhakra Mechanical Division. XEN, Hydrology and
SDEA//ater Regulation will make day and night discharge observation arrangement at the important
discharge sites through their staff. A list of persons along with their contact number responsible for
the collection of information relating to inflows is attached as Annexure XXXll. lt will be ensured by the
concerned Executive Engineers that work of observations of discharge as
Prepared
ASE-I
By Reviewed and Approved By lssued By I
LNhcd,-ot
l
BHAKRA BEASMANAGE,MENT BOARD
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
Doc. No.BHD/DESIGN/EAP-Datezl2-D7-20\9Issue No. 02Page.31 of66Pase Revision No. 0
TITLE: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL
FAILURES, EARTHQUAKES OR OJEE&S..^ r, ^,,i::"-"1,: LOntfOUeq
above and of all the instruments in the dam body runs smoothly even during the period of darkness,
inclement weather and non business hours.
On receipt of precise and accurate information about the high floods likely to impinge,
DirectorfuVater Regulation in consultation with the Member/lrrigation / Chief Engineer, Bhakra Dam
will arrange lowering of reservoir level in anticipation of the approaching floods with thorough study of
the situation.
Director Water Regulation will make request to C.E. BSL Sundernagar for stopping releases from
Dehar Power Plant into river Sutlej due to high floods.
4.5 PROVIDING ALTERNATIVE SOURCES OF POWER
ln the event of power failure during the crucial hours of emergency at site when different
activities are running simultaneously, it is very much imperative to have an alternative source of power
to meet with such situation so that execution may be carried out smoothly without any hindrance. For
restoring power supply to the radial gates ( in the event of failure of existing arrangement of power
supply , the controls be immediately connected to the feeder from the right bank power plant'
Besides a feed back arrangement of the power supply from Ganguwal through the left bank power
plant be established/ made. XEN Mechanical will get the supply restored through XEN Electrical and
concerned
Divisional Engineer of power wing. For running the other works, Xen, Bhakra Electrical may make
arrangements with the following sources:-
A. XEN, NANGAL DAM DIVISION
Mechanical WorkshoP
Nangal Dam Division
Capacity
20 KVA
Contact No.
01887-220563(O)
^lssued By
S/d,{dR) AReviewed and APProved BY
Director Design
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
TI'I.LE: BMBRGENCY ACTION PLANFORHANDLING SITI-IATION ARISING OUT OF
HYDnOLOGICAL I'AII,URBS, EARTHQUAKBSoR orl{ERs.controtrEed
t-I
I
I
BIIAI(RA BE,AS
MANAGE,MENTBOARD
Doc. No.BIID/DESIGN/EAP-Date: 3l-12-2014Issue No. 02Page.32 of66Page Revision No. 0
ii)
B.
r)
ii)
iii)
iv)
Kotla Store C/O Kotla 1B KVASub Division,Kotla
PRIVATE AGENCIES
Mahajan Tent House, Nangal
Paul Ten Tent House, Nangal
Kalia Tent House, Nangal
PuriTent House, Sector-2 Naya Nangal
9888950249 (M)
921 6922454, 9216926454 (M)
01887-224705
01887-223286
01887-221230
The diesel generating sets with Nangal Dam Division are wheel operated and can be
transported to site with the help of any vehicle such as jeep or truck etc.
The available approach / route to site where diesel generating sets are to be installed will be
decided and conveyed by SDO instrumentation Bhakra. Also the name of operator will be pre decided
by SDO concerned so that smooth operations may be ensured during such emergency hours.
5.0 EXECUTION OF WORK AT SITE
The engineer in charge at site will ensure that the construction work at site of emergency is
being carried out stricly in accordance with construction drawings & specifications or any other
decision taken in consultation with experts, Chief Engineer, Bhakra Dam, SE, BDC, Director Design,
Director Dam, Safety & S.E. (NMC) at the site of emergency. They would decide depending upon the
quantum of repair/ reconstruction work, whether the work is to be got executed through large
construction firms or purely through the department or small contractors.
Reviewed and ApProved BY
rector
ry
-ffiirr;F
BHAKRA BEASMANAGE,ME,NT
BOARD
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02
Page. 33 of 66
Page Revision No. 0
TITLE: EMERGENCY ACTION PLANFORHANDLING SITUATION ARISING OUT OF
I{YDROLOGICAL FAILURES, EARTHQUAKES OR.THERS' Controlled
For ensuring quality ARO and his staff would be requisitioned Engineer in charge of the site
would get the stock piled material tested for their suitability for all purposes before its use at site. The
control compaction of the soil desirable at any place of repair be maintained through the periodic
check up of the relative density of the soil. A complete record maintenance of the in-situ density is
mandatory. The reporting of such data shall be made at regular interval to higher authorities. Quality
control check up in the form of fabricated specimen need be exercised through inspecting agency,
ARO.
The daily progress at site will be recorded shift wise. All officers are supposed to perform their
duties as per list of responsibilities assigned to each individual division wise. Any discrepancy noticed
at site of work/ during execution should be brought to the knowledge of Engineer-in-charge and the
engineer in-charge shall try to remove/rectify such discrepancy promptly so that progress of work is
not suffered/
6,0 INUNDATION MAPS
lnundation maps are usually needed to develop an adequate evacuation plan when numbers
of dwellings are located downstream of the area where emergency has been taken place' The maps
show an outline of the area
covered by the excessive releases in case of mishap in detail to identify dwellings and other
significant features that are likely to be directly affected.
It is pertinent to mention here that the inundation maps for downstream area of Nangal Dam
are available with Punjab Drainage Department' lt is,
Reviewed and APProved BY
iis ,,I8:_' !rq!,
''\.l**sd
I]I-IAKRA BEASy1\4S!v!II I9ARp
therefore, required that inundation maps for the vulnerable reaches (in case of any expected mishap)
should be developed/ made available by Punjab Drainage Deptt. No action in this connection is
required to be taken by BBMB authorities.
7.0 DESCRIPTION OF LOCATION OF BHAKRA DAM
Bhakra Dam is a straight gravity concrete dam740 ft high above the deepest foundation level
and 550 ft high above the river bed on river Sutlej in lower Shiwalik hills. lt is located at approximately
354 km north of Delhi hearing its coordinates as 76o .24' El. Long & 31o -25' N Lat. The dam is
located in Village Bhakra of District Bilaspur of Himachal Pradesh which is 14 Km from Nangal
Township District Ropar in Punjab. lt has two power houses one on right side and another one on left
side. The Power House have installed generation capacity of 785 MW & 540 MW respectively. Dam
rs well connected both by rail as well as by road. The broad salient features of the project have been
appended for reference at Annexure -ll.
8.0 TRAINING
Training of people involved in EAP should be conducted to ensure that they are thoroughly
familiar with all elements of the plan availability of equipment and their responsibilities & duties under
the plan. Technically qualified personnel should be trained in problem detection and evaluation and
appropriate remedial (emergency & non emergency) measures. This training is essential for proper
evaluation of developing situations at all levels of responsibility which initially is usually based on
onsite observation. A sufficient number of people should be
Prepared By
ASE-I
M
BHAKRA NANGAL PROJECTIN'I'EGRATED MANAGEMENT SYSTEM
Doc. No.BHD/DESIGN/EAP-l)ate:72-07-2019Issue No. 02Page. 34 of 66Page Revision No. 0
TITLE: EMERGENCY ACTION PLANFORI{ANDLING SITUATION ARISING OT]'I' OF
HYDRQLOGICAL }-ATLURBS,BARTHOUAKES OR OTI{ERS.
Reviewed and Approved By
Director Design
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
BHAKRA BEASMANAGEMENT BOARD
TTTT,N NVTTNGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL
FAILURES, EARTHQUAKES ORJfTHERS.
Doc. No.BHD/DESIGN/EAP-Datezl}-O7-2019Issue No. 02
Page.35 of66Pase Revision No. 0
trained to ensure adequate coverage at all times. A training plan could be included as an appendix to
the EAp Exercises simulating sectional breach / sliding or over topping due to high flood and failure
due to mal functioning of any of the mechanical installation are excellent training mechanism for
ensuring readiness cross training in more than one responsible position for each individual is
advisable in order to provide alternates. A careful roaster should be kept of training completed and
refresher training conducted.
g.0 Duties and responsibilities to be discharged by different officers during emergency
hours at Bhakra Dam are enlisted as below
Name / Desiqnation / Addressto notityllnform higher authorities of BBMB
/outside agencies about the mishap as per
notification flow chart of particular Alert level
as per situation at site.
To notify District Magistrate who is Chairman
Co-ordination Relief Committee, Ropar
To keep close watch on the different activities
being carried out by different agencies at the
time of emergency.
To accord all anticipation sanctions at site'
To make request / notifY Chief
9.1
C.E. Bhakra Dam
1 -Western Avenue, Nangal
01887-223024 (R)
01887-223001 (o)
^lssued Bv
Gf;ui,R)A-Reviewed and APProved BY
BIIAKRA BEASMANAGEME,NT
BOARD
Doc. No.BI{D/DESIGN/BAP-I)ate:12-07-2019Issue No. 02Page.36 of66Page Revision No. 0
BIIAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
TITLE: EMERGENCY ACTION PLANFORI{ANDLING SITUATION ARISING OUT OF
HYDI olo9l.t,5"-iHtR,S*lii8mf
9.2
s.E. (HO)
01887-223164
01887-223062
(o)
(R)
. Engineer BSL Sundernagar and Chief
Engineer, Beas Dam Talwara, Thein
Dam & NFL for providing required
resources as per Alert level
. To provide all types of information to
Board office in regard to evacuation
rescue & relief operation
. He will ensure the timely restoration of
all the works after emergency is over
. He will make requests to C.E. BSL for
stopping releases from Dehar Power
House into Satlej due to high floods
. He will also contact the large
constructional comPanies having
expertise in Dam construction activities
(Ref. Annexure-XXV)
He will also remain in touch with Kol Dam
authorities with regard to the position of
impending imminent floods of high intensity
. To notify / inform different agencies i
offices as per notification flow chart of
particular Alert level as per situation at
site
To keep constant liaison with Civil
BHAKRA BEASMANAGEMENT
BOARD
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02
Ptge.37 of 66Page Revision No. 0
TITLE: EMERGENCY ACTION PLANFORHANDLING SITUATION ARISING OUT OF
HYDROLOGICAL FAILURES, EARTHQUAI(ES ORorHERS. ContrOlled
Authorities of Punjab & Himachal and
all other including all the Superintending
Engineers / Directors under Bhakra
Dam administration and issue permit to
security personals for entering in Dam
atea.
He will supervise the functioning of
control room and will be well equipped
with all type of information including
rescue & relief oPerations etc.
He will act as EAP Coordinator and
responsible for all EAP related activities
such as trainings, drills and revision to
EAP if any
Being spokesperson, he is required to
dissemlnate information and make
contact to utilize media as appropriate
at the time of emergency on behalf of
Chief Engineer, Bhakra Dam
9.2
s.E. (BDC)
01887-223017 (O)
. To have timelY and reliable
identification, evaluation & classification
of exlsting or potential emergency
condition as per information of XEN,
Bhakra Dam Division
To notify / inform different agencies /,
Reviewed and APProved BY
BHAKRA NANGAL PROJECTII\TEGRATED MANAGEMENT SYS'TEM
Doc. No.BHD/DBSIGN/EAP-Date:12-07-2019Issue No. 02Page.38 of66Page Revision No. 0
TITLE: EMERGENCY ACTION PI,ANFORI{ANDLING SITI]AT'ION ARISING OUT OF
I.IYDROLOGICAI, FAILURES, EARTIIQUAKES QRorrrERS. COitrolleO
BI-IAKRA BEASMANAGEMENT
BOARD
. offices as per notification flow chart of
particular Alert level as per situation at
site.
. To keep liaison with all SEs/Directors,
teams to handle disaster, XENs and
other involved directly / indirectly to
handle the disaster
. To keep close watch / supervrsion at
site when construction activities of any
quantum are in progress
. To ensure that work at site is being
carried out strictly as per construction
drawings and specifications or any
other decision taken in consultation with
experts, C.E. Bhakra Dam, Director
Design & Director, Dam Safety, SE
(NMC) at site
. He will ensure that there is no danger of
spread of any epidemics or water borne
diseases after the floods.
. He will also remain in touch with Kol
Dam authorities with regard to the
position of impending imminent floods
of high intensity
To accord sanction in anticipation as per
emergent Rules of DFR provisions
i
l
t*lSffi*\rq**sfl"::":r*"':::'
BHAKRA BEASMANAGEMENT BOARD
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02Page. 39 of 66
Pase Revision No. 0
rTTiE' EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL
FAILURBS, EARTHQUAKES OR OTHERS. -.Coatrolled
. within his comPetencY
. To keep close watch on rescue, relief &
evacuation operations being carried out
by different teams
. To ensure proper access to site at the
earliest possible
. To provide all types of information
related to the execution of work to S.E.
(HQ)from time to time.
. Adequate lighting arrangements should
be ensured at all identified / vulnerable
sites well in advance in anticlpation of
any mishaP.
. To keep liaison with civil authorities who
have been carrying all rescue & relief
operation at site of emergency & also
remain in touch with control room of civil
authorities. Also to provide all type of
information to BBMB Control room at
Bhakra as well as in TownshiP area
He will ensure timely action to arrange for
some suitable / competent agency or agencies
to take up the reconstruction activities at dam
site / colony area to restore the occurred
Prepared
ASE-I
Reviewed and APProved BY
DtffiSDesisn
\
g;'
BHAKRA BEASMANAGEMENT
BOARD
9.4
s.E (NMC)
01887-223004 (o)
HANDLING SITUATION ARISING OUT OF
HyD Ro L o Grc AL "^Jly#R
rfrffir?BfiEE n"TTuniEnnERGENCY ACTIoN PLANFoR
Reviewed and APProved BY
damages due to floods.
He will ensure that releases from Dehar
Power House into Satluj have been
stopped during the Period of
unprecedented floods.
To use RePort Form No. 1,2 and 3
when recording various emergencY
situations and unusual occurrences'
These forms have been attached with
EAP as Annexure -XVll.
. To notfy / inform different agencies /
offices as per notification flow chart of
particular Alert level as pr situation at
site.
. To ensure that all related machinery /
equipments are in running conditions
and have been dePloYed as Per
requirement of S.E' BDC/XEN Bhakra
Dam Division
To ensure that all lighting arrangement have
been made at all emergency locations (Bhakra
& Colony Area) including requirement of power
supply
Prepared BY
,,r".ry
Doc. No.BHD/DESIGN/EAP.Datezl2-D1-2019Issue No. 02
Page. 40 of 66
Page Revision No.0
BHAKRA NANGAL PROJECTIN'T'EGRATED MANAGEMEN'T SYSTEM
ASE-I
^ lsEUed BY
GP"Y*#
BHAKRA BEASMANAGEMENT BOARD
BHAI(RA NANGAL PROJECTTNTEGRATED MANAGEMENT SYSTEM
Doc. No.BHDIDESIGNTEAP-Date:12-07-2019Issue No. 02
Page.41 of66Pase Revision No. 0
ffff-Et EMERGENCY ACTION PLANFOR HANDLINGSITUATIOI{ ARISING OUT OF HYDROLOGICAL
FATLURES, EARTHQUAI(ES Oi( OTHEBS. -- ControllPd
. to all equipments / machinerY
. To ensure that all type of material
available and required at site of
emergency is being delivered by Supdt.
Proc. Central Stores, Nangal T/Ship
. ln case of Power suPPlY failure
alternative arrangement for supply of
power to equiPment / machinerY & at
emergency locations should be
ensured.
. To ensure repair / mtc. of machinery, if
required, at site by deputing a team of
expert mechanics so as to carry smooth
working at site.
. He will put all efforts for an early
restoratlon of the normal work.
. To have liaison with S.E, Talwara
Circle, S.E. BSL Circle-ll, Sundernagar
and Ranjit Sagar Dam administration for
any required resources other than
available
Formation of purchase committee / committee
in consultation with C.E. Bhakra Dam for
procurement of material from appropriate
source
Reviewed and APProved BY
BHAI(RA BEASMANAGEMENT BOARD
Doc. No.BI{D/DESIGN/EAP.Date:12-07-2019Issue No. 02Page. 42 of 66
Page Revision No. 0
BHAKRA NANGAL PROJECT'IN'TEGRATED MANAGEMENT SYSTEM
TITLE: EMERGENCY ACI.ION PLANFOR T'IANDLINGSITUATION ARISING OUT OF HYDROLOGICAL
FAILURES, EARTHQUAKES OR OTTIERS.
. through spot purchase
. To ensure procurement of different
lubrications and spare parts for smooth
running of machinery
. To remain in touch with C.E. Bhakra Dam,
S.E. BDC & SE (HO) during such
emergency hours.
Adequate lighting arrangements should be ensured
at all identified / vulnerable sites well in advance in
anticipation of any mishap.
9.5
Director Design ,01887-223108 (O)
Safety,01887 -2231 79 (O)
. Director Design should also ensure that
different tests of materials for their suitability
at the site of construction (to be carried out
in laboratory under his control) are
performed meticulously & promptly. He
must ensure that all the apparatus is in
working order and taboratory is well
equipped with trained staff.
. Director Design should inspect the
emergency site immediately when he gets
the information of such mishap and to offer
remedial/ suggestive measures at site
Director Design will ensure all time availability of
SDE's & ADE's & Drafting hands under the
administration for imparting any required guidance
to field persons at srte or issuance of construction
drawings, if necessary during the execution phase
of damaged site
Director, Dam Safety should inspect the site & when
he gets the information
9.6
Director / Dam
Reviewed and Approved BYPrepared By
srgn
BHAKRA BEASMANAGEMENT BOARD
RHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
Doc. No.BHD/DESIGN/EAP-Datezl2-07-2019Issue No. 02
Page.41 of66Pase Revision No.0
TTTI,TibNTERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF ITYDROLOGICAL
F ATLURE s, E ARrH Q UAKE s .i,fftThti.d_
. to all equipments / machinerY
. To ensure that all type of material
available and required at site of
emergency is being delivered by Supdt'
Proc. Central Stores, Nangal T/Ship
. ln case of Power suPPlY failure
alternative arrangement for supply of
power to equiPment / machinerY & at
emergency locations should be
ensured.
. To ensure repair / mtc. of machinery, if
required, at site by deputing a team of
expert mechanics so as to carry smooth
working at site.
. He will put all efforts for an early
restoration of the normal work.
. To have liaison with S.E' Talwara
Circle, S.E. BSL Circle-ll, Sundernagar
and Ranjit Sagar Dam administration for
any required resources other than
available
Formation of purchase committee / committee
in consultation with C.E. Bhakra Dam for
procurement of material from appropriate
source
Reviewed and APProved BY
BHAKRA BEASMANAGEMENT
BOARD
BIIAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
Doc. No.BHDIDESIGN/EAP-Datezl2-01-2019Issue No. 02
Page.43 of66Page Revision No. 0
TNLE' EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF ITYDROLOGICAL
FAILURES, EARTHQUAKES OR OTHERS.
Controlled
. of any mishaP at Bhakra Dam and to
offer remedial / suggestive measures
for ensuring total safety of the structure
Director, Dam Safety, will also ensure the
availability of staff under his administration
during emergencY hours
To notify/inform different agencies I
offices as per notification flow chart of
particular Alert level as per situation at
site
To make request to C'E. BSL for
stopping releases from Dehar Power
Plant into Satlej due to high floods
To keep constant liaison with Member,
lrrigation, BBMB, Chandigarh, Chief
Engineer, Bhakra Dam, Nangal, SE
BDC & SE (HO) Nangal
He will issue directions to SDE, Water
Regulation, Nangal for making releases
d/s Nangal Dam.
He will also keep constant liaison with
l.M.D. during emergency of Period
He will arrange to lower the reservoir in
consultation with Member lrrigation/C E'
Bhakra Dam on receiPt of accurate
information of high floods
9.7
Director / Water Regulation
01887-223758 (O)
Reviewed and APProved BY
oif io'
BHAKRA BEASMANAGEME,NT
BOARD
Doc. No.BHD/DESIGN/BAP.Date:12-07-2019lssue No. 02Page.44 of 66
Page Revision No. 0
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTBM
TITI,E: EMERGENCY ACTION PI,ANFOR I{ANDI,INGSITUATION ARISING OUT OF I-IYDROI,OGICAI,
FAILURPS,.BARTHQUAKES OR OTHBRS.- Cortroilot
SDE Water regulation BBMB, Nangal
01887-223043(O)
Xen Nangal Dam Division
01887-220563 (O)
impinging the reservoir if the situation warrants so
. To notifyiinform different agencies / officesas per notification flow chart of particular
Alert level as per situation as site. He will pass on information as a warning
notice of emergency of routing high floods
to all the regulating agencies havingconcern with the water releases fromBhakra Dam and as contained in O & M of
Nangal Dam & Nangal hYdel channel(Annexure XXVII)
. To keep constant liaison with Director,Water Regulation, Nangal, SE, BDC'
Nangal SE, (HO) Nangal & XEN, NangalDam Division, XEN Bhakra Mechanicalduring such mishaP
. He will act promptly as per instructionscontained in O & M of Nangal Dam & NHC
. He will also make day & night dischargeobservation arrangement at the discharge
sites under his control through his staff and
also keep recordof other discharge sites under the control of
XEN Hydrology during such exigency.
. To post a special observer at dam site
during Period of high floods.
To notify / inform different agencies as per
notification flow chart of particular Alert
level as per situation at site and offlces to
be informed of floods as per Annex.XXVll
Reviewed and APProved BY
$ePrepared
ASE-I esrgn
B}IAKRA BE,AS
MANAGEMENT BOARD
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
Doc. No.BHDIDESIGN/EAP-Date:12-07-2019Issue No. 02
Page. 45 of 66
Pase Revision No. 0
rfff,f t EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISII{G OUT OF HYDROLOGICAL
FAILURES, EARTHQUAKES OR OTHERS.fnn*-^Ir
. To convey information regarding such
emergency to all control points / regulation
points on NHC
o To keep constant liaison with S.D.E' Water
regulations S.E. (B.D.C.)
. He will ensure the timely operation of all the
twenty four bays of Nangal Dam in the
event of an eminent potential emergency
situation
. He will remain vigilant and take all possible
measures to ensure safety of structures
under his control
. For hiring labour for the operation of gates
he may contact local contractors as per
Annex XVl.
. XEN should keep readily available with him
contact numbers of all the persons (skilled /
unskilled) working under his administration
. Record / strength of skilled workers of
different categories whose services are
required during emergency operation should
also be available
. XEN should keep a list of readilY
Reviewed and APProved BY
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
BHAKRA BEASMANAGEMENT
BOARD
i
l
iI
L
t_
available all types of stores under his
control along with available quantity of
each item
To ensure that daily diary is maintained
in respect of each activity carried out at
site by persons/staff under his control
and also the higher authortties are
appraised accordingly during such
emergency.
XEN, should ensure that strict watch is
being kept on the banks of Nangal
pond, Nangal dam abutments, flare out
wells & Nangal Dam itself during period
of such emergency
To ensure that timely action has been
taken in consultation with SE (BDC) &
C.E. Bhakra Dam to release water
through escapes / silt ejector if situation
so warrants .
. To ensure that each individual has been
informed about his duty well in advance
during such Period of crisis
. To provide all types of information
periodically to SE (BDC) & to control
room established in colonY area
XEN should ensure that material such
lspued ByPrepared By Reviewed and APProved BY
Di,$HPu.isn
\
#
Doc. No.I}HD/DESIGNTEAP-Dzte:12-07-2019Issue No. 02
Page.46 of66Page Revision No. 0
1rrln, EMERGENCY ACTIoN PLANFoRHANDLING SITUATION ARISING OUT OF
HYDROLOGICAL FAILURES, EARTHQUAKES-OROTHERS.
.-r:i ri, ?
B}IAKRA BE,AS
MANAGEMENT BOARD
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02
Page. 47 of 66
Page Revision No. 0
TITLE: EMERGENCY ACTION PLANFORHANDLING SITUATION ARISING OUT OF
HYD RoL o Gr c AL " ^Jrrffi..t, "ffi
o as cement sand & aggregate available
in his stores is fresh. A batch number of
each material must be mentioned
clearly to ensure that good material as
per required specification has been
used
. XEN to ensure that all material being
used for execution of work at site has
been tested for lts suitability for all
purposes as Per sPecifications of
construction drawings.
. To ensure that all lighting arrangements
at Nangal Dam have been made
adequatelY through XEN Bhakra
Electrical during such Period of
emergency
. XEN will also inform R'E. Ganguwal
and Kotla Power houses about the
emergency situation at Bhakra
XEN shall also ensure attendance 24 hours at
Nangal Dam during such exigency at Bhakra
fo notity t inform different agencies / offices as
per notification flow chart of particular Alert
level as Per situation at site
9.10
XEN, RM & SR Divn
01887-223092 (O)
Reviewed and APProved BY
BHAKRA BEASMANAGEMENT
I]OARD
Doc. No.BIIDIDESIGN/EAP.Date:12-07-2019Issue No. 02
Page. 48 of 66
Page Revision No. 0
BI{AKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
TTTLE' EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL
FAILURES, EARTI'IQUAKES OR OTHI]RS.
r ';'11 : Controllef,
. ifN should keep readily available wlth
him contact members of all Persons
skilled / unskilled working under his
control
. Record / strength of skilled workers of
different s whose services are required
during emergency operation should
also be available.
. XEN should keeP a list of readilY
available all types of stores under his
control along with available quantity of
each item
. XEN should also keeP a list of
alternative arrangement in the absence
of skilled workers, readily available
. XEN shall also keep a list of machinery
in working order under his control
readlly available
. Mode of conveyance & shortest
possible route to reach the emergency
site should be identified well in advance
on consultation with XEN Bhakra Dam
Division
To ensure that divers under his control are well
equipped and ready to perform any duty
assigned to them during an
Reviewed and APProved BY
BHAKRA BEASMANAGEMENT BOARD
BHAKRA I{ANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02
Page.49 of66Page Revision No.0
TITLE: EMERGENCY ACTION PLANFORHANDLING SITUATION ARISING OUT OF
HYDROLOGICAL FATLURES, EARIHQUAKJS .OR OTHERS. UONtTOIICd
emergencY hour
To maintain daily diary in respect of
activities performed by persons under
his control and aPPrise S.E' (BDC)
about the same
, He will maintain a constant liaison with
XEN Bhakra Dam Division and S E'
(BDC) during such eventualitY or
mishap.
, He will make a Pre Planned
arrangement for deploying the persons
on site of emergency so that work can
be performed smoothlY & PromPtlY'
r He will also inform village Pardhan U/S
about rising RWL as per Annexure Vlll'
o He will also ensure that all stock
present in his stores such as cement,
sand & aggregate is fresh and quite
suitable for its use at emergency site'
Batch of Piled uP cement should be
mentioned clearlY
. XEN will also ensure that no visitor pass
is issued to anyone and no vehicle will
be allowed to cross the toP of dam
during emergency
XEN will also ensure that the sufficient
Reviewed and APProved BY
mLn urnrncnNcv lcrroN PLANFoR HANDLING
I]i_IAKRA BEASMANAGE,MENT
BOAI{t)
SITUATION ARISING OUT OF ITYDROLOGICALFAILURESI fuIdTHqUAKES OR OTI{ERS.
Comtrolle*
I
I
I
. numUer of life saving jackets under his
control are in good working condition &
the persons concerned are well trained
to use them
XEN will also keeP a record of local
persons well trained in swimming I
diving & who can help in rescue & relief
operation at emergencY site'
XEN will also keeP a list of Persons
having private boats with them for
rescue operation during emergency
hours.
XEN should also ensure that
photography of the site of emergency
has been carried out intensively' All the
events have been covered fully till the
completion of execution work
XEN will also ensure that Public
Relation Officer under his administration
will look after the duties to be performed
by him under the overall control of S'E'
(HQ) Nangal who ls incharge of control
room to disseminate all information in
relation to mishaP at site
XEN shall also ensure attendance 24
Doc. No.BHDIDESIGN/BAP-Date:12-01-2019Issue No. 02
Page.50 of66Page Revision No. 0
BIIAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
Reviewed and APProved BY lssued By
.q ')!{
BI_IAKRA BEASMANAGEMENT BOARD
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
Doc. No.BHD/DESIGNIEAP-Dilezl}-D7-2019Issue No. 02
Page.51 of66Pase Revision No. 0
ffrf,f t nVfnRGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL
FATLURE s, EARTHQUAT(E s "tHIffiUc{
hours dur:lng such exigencY
XEN shall also maintain liaison with
loading centers of fishery department in
Bhakra reservoir for arrangement of
boats & boatmen, if required, during the
operation of rescue & relief as Per
Annex.XXVIll
XEN will also ensure that duties assigned
to him in team for rescue, relief and
evacuation operation at Bhakra are
discharged properly during emergency
hours.
io have timely and reliable identification
evaluation & classification of existing or
potential emergency condition in
consultation in with S.E. (BDC), SE
(NMC) & C.E. Bhakra Dam
To notify / inform different agencies /
offices as per notification flow chart of
particular Alert level as per situation at
site
XEN should keep readily available with
him contact numbers of all Persons
skilled / unskilled working under his
administration
9.11
XEN Bhakra Dam Division
01887-223075 (O)
Reviewed and APProved BY
Doc. No.I}IID/DESIGN/EAP-Date:12-07-2019Issue No. 02
Page.52 of66Page Revision No. 0
BHAKRA NANGAL PROJBCTTNTEGRATED MANAGEMENT SYSTBM
TTTT,N UITTRGENCY ACTION PLANFOR HANDI,INGSITUATION ARISING OUT OF ITYDROLOGICAI,
tsAILUREF, EARTI{QUAKES OR O'I'HERS.
ControlledBHAKIIA BEASMANAGEMENT
BOARD
. Record / strength of skilled workers of
different categories whose services are
required during emergency operation
should also be available
. XEN should keep a llst of readilY
available all types of stores under his
control along with available quantity of
each item
. XEN should also keeP a list of
alternative arrangement in the absence
of skilled workers, readily available.
. XEN should also keeP a llst of
machinery in working order under his
control readilY available.
. Mode of conveyance & shortest
possible route to reach the emergency
site should be identified well in advance
in consultation with XEN R/M and XEN
Bhakra Mechanical
. To ensure that fire fighting arrangement
under his control is well equipped &
ready to Perform dutY in shortest
possible time during an emergency
hour.
To maintain daily diary in respect of activities
Performed bY Persons under
Reviewed and APProved BY
BHAKRA NANGAL PROJECTTNTEGRATED MANAGEMENT SYSTEM
Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02
Page.53 of66Pase Revision No. 0BHAKRA BEAS
MANAGEMENT BOARD
UTT.N NNNNRGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL
FATLURES, EARTHQUAKE s o" otffff*ollud
his control and aPPrise S'E. (BDC)
about the same
, He will maintain a constant liaison with
XEN, Mech, XEN Elect, XEN RM, XEN
Ngl Dm and S.E. (BDC) during such
eventually or mishaP
, To ensure that all lighting arrangements
required are according to requirement
of work site
. To ensure that NFC's are Pasted in
Bhakra control room, Power houses &
at other keY locations.
o After identification of emergency
condition. He will stop all the routine
works being carried out at dam site and
in surrounding area.
. He will allow minimum possible persons
to work inside the dam bodY during
such Period.
. He will also keep a readily available
copy of keY drawings of Bhakra dam
He will ensure identification of sources
Reviewed and APProved BYPrepared BY
ASE-I
RT{AKRA BE,AS
I unxrtcpMENT BoARD
Doc. No.BIID/DESIGN/EAP-Date:12-07-2019Issue No. 02
Page.54 of66Pase Revision No. 0
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
TTTN TiVTNNCENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL
FAILURE S, EARTH QUAKB S OB.Q}IERfr .E
. of suppiy of suitable aggregates, natural
or processed, from nearlY khads or
through contractors
. He will ensure proper stock piling of
aggregate for meeting the demand of
minor damages.
. He will make a Pre Planned
arrangement for deploying the person
on site of emergency so that work can
be Performed smoothlY & PromPtlY'
. He will also ensure that all stock
present in his stores such as cement'
sand, aggregate etc' is fresh and quite
suitable for its use at emergency site'
Batch of Pile uP cement should be
mentioned clearlY.
XEN will also ensure that proper arrangement
has been made to carrY
Riv'rewed and APProved BY
oirq{esisn
. ; - '8r+'t'
B}IAKRA BEASMANAGEMENT BOARD
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
Doc. No.BHD/DESIGNIEAP-D*e:12-07-201.9Issue No. 02
Page.55 of66Pase Revision No. 0
TITT,N U'ITERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL
FATLURES, EARTHQUAI(ES "" tfff,fflud. Leveling of the site by survey party and
assist during the repair construction
activities of different controlling points'
. XEN shall ensure that Report Form No'
1, 2 and 3 are to be used when
recording various emergency situation
and unusual occurrences. These forms
have been attached with EAP at
Annexure XVll
. XEN Shall also ensure attendance 24
hours at Bhakra Dam during such
exigencY .
. XEN will also ensure that a formal
status report for dam facility has been
developed by him as per requirement'
r XEN will ensure that work at site is
being carried out strictlY as Per
construction drawings & specifications
or any other decision taken in
consultation with experts, C'E Bhakra
Dam, S.E. (BDC), Director Design,
Director / Dam Safety & S.E' (NMC) at
site of emergency
He will seek immediate help from civil
authorities through higher offices or directly in
case of any Potential
Reviewed and APProved BY
RHAKRA NANGAL PROJECT
TNTEGRATED MANAGEMENT SYSTEM
ffi TroN PLA|{FoR HANDLING
SITUATION ARISING OUT OF IIYDROLOGICAL. FAILURES, EARTHQUAKES OR OTHERS.
Doc. No.BIIDIDESIGN/EAP-Datezl2-O7'Issue No. 02
Page.56 of66Revision No. 0BHAKRA BE,AS
MANAGEME,NT BOARD
Prepared BY
9.12
XEN BC & TownshiP Divn'
olBB7-223040 (o)
EmergencY due to sabotage.
fo notity / inform different agencies /
offices as per notification flow chart of
particular alert level as per situation at
site
XEN should keep readily available with
him contact numbers of all Personsskilled / unskilled working under his
administrationRecord / strength of skilled workers of
different categories whose services are
required during emergency operation
should also be availableHe will ensure that there is no danger
of spread of anY ePidemics or water
borne diseases after the floods'
XEN should keeP a list of readilY
available all types of stores under his
control along with available quantity of
each item
Reviewed and APProved BY
)#f
i:*p,E*,;e-\,&.*ff-
;t. BHAKRABEASMANAGEMENT BOARD
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
Doc. No.BHD/DESIGN/EAP-Dile:12-07-2019Issue No. 02
Page.57 of66Pape Revision No. 0
rlrrrnt EVTERGENCY ACTION PLAI{FOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL
FAILURES, EARTHQUAKES OLOTHERS.- Corfrolled
To maintain daily diary in respect of
activities performed by persons during
such eventuality or mishap & report to
(sE, BDC).
He will make a Pre Planned
arrangement for deploying the persons
on site of emergency so that work can
be performed smoothlY & PromPtlY.
He will also ensure that all stock
present in his stores such as cement,
sand, aggregate etc. is fresh and quite
suitable for its use at emergency site'
Batch of Piled uP cement in stores
should be mentioned clearlY.
XEN will also ensure Providing
shed/toilets for temporary stay of
persons engaged in execution of work
at site in shifts and also to provide
temporarY stores at site as Per
requirement of XEN Bhakra Dam
Division
He will also seek helP from civil
authorities as well as N'G.O's coming
fonrvard for the Purpose
Reviewed and APProved BYPrepared
ASE.I
By
({
Doc. No.BT.ID/DESTGN/EAP-Date:12'07-2019Issue No. 02
Page.58 of66Page Revision No. 0
BHA.XRA NANGAL PROJECT
INTEGRATED MANAGEMENT SYSTEM
N PLANFOR HAI{DLING- siiualloN ARISING our oF ITYDRoLoGICAL
FAILURES, EARTI{QUAKES OR OTHERS.BHAKRA BEAS
MANAGEMENTBOARD
9.13
XEN Bhakra Elect' Division
01887-223094 (O)
T" nohfy / inform different agencies /
offices ,t put notification flow chart of
particular Alert Ievel as per situation at
siteXEN should keep readily available with
him contact numbers of all Persons
skilled i unskilled working under his
administration
Record / strength of skilled workers of
different categories whose services are
required during emergency operations
should be available.
XEN should keeP a list of readilY
available all types of stores under hts
control along with available quantity of
each item.
ffe w,tt arrange to make mobile van
announcements through public address
system about the emergencY
He will also ensure cleanliness and
sanitation of the area during & after the
occurrence of such mishaP
XEN shall also ensure attendance 24
hours durrng such exigencY
XEN shall also make all arrangements
for temporary dispensary at site-to give
first aid to all during rescue & relief
operation.
Rev'rewed and APProved BYPrepared BY
Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02
Page.59 of66Pase Revision No. 0
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
BHAKRA BEASMANAGEMENT BOARD
TrrLEr EMERGnxCv acrroN PLANFoR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL
FAILURES, EARTHQUAKES OR gfry
XEN should also keeP a list of
alternative arrangement in the absence
of skilled workers readily available'
, XEN should also keeP a list of
machinery in working order under his
control along with names of operators
readily available with him
, . Mode of conveyance & shortest
possible route to reach the emergency
site should be identified well in advance
in consultation with XEN Bhakra Dam
. XEN will ensure that adequate lighting
arrangements have been made at all
vulnerable points both at Bhakra & in
T/Ship area
. XEN will ensure that all lighting
arrangements have been made at
emergency site including requirement of
power suPPlY to all equiPment I
machinery and to bring to the notice of
S.E.(NMC) regarding each activity
performed / completed at site and to the
satisfaction of Persons working I
executing the job at site
XEN will ensure that daily diary of each
Reviewed and APProved BY
oir{esisnPrepared BY
0ASE_'
w
BHAKRA BEASMANAGEMENT BOARD
Doc. No.BHD/DESIGN/EAP-Date:12-01-2019Issue No. 02
Page. 60 of 66
Page Revision No.0
BHAKRA NANGAL PROJECT
INTEGRA'TED MANAGEMENT SYST'EM
rrrlf , nUnnCENCY ACTION PLANFOR
TTAXNT,TNG SITUATION ARISING OUT OF
HYDROLOGICAI, FAILURES, EARTHQUAKES OR
Supdtt. Proc. C/Stroes Divn Nangal Township'
01887-223011 (O)
. etr"nt / activity performed at site ls
maintained
. XEN will ensure that in case of power
failure adequate arrangement to run the
equipment on alternative source of
Power has been made
. XEN will maintain a liaison with XEN
Bhakra Dam, XEN R/M, XEN Mech ' SE
(NMC) & SE (BDC) during emergency
hours
. XEN will make a Pre Planned
arrangement for deploying the persons
on site of emergency so that work can
be Performed smoothlY & PromPtlY'
. XEN will also ensure that sound
arrangement under his control is trouble
free & well maintained to use at
emergency site to give warning for
evacuation of inhabitants in the near
vicinitY of mishaP.
XEN will also ensure attendance-24 hours
during such exigencY
OffGt sh"rld keeP readY with him
contact numbers of all persons skilled /
unskilled working under his
administration
Rev-iewed and APProved BYPrepared BY
Doc. No.BHD/DESIGN/EAP-Da/te:12-07-2019Issue No. 02
Page.61 of66Pase Revision No. 0
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYqTEU
BHAKRA BEASMANAGEMENT BOARD
@IONPLANFORHANDLINGSITUATION ARISING OUT OF ITYDROLOGICAL
FAILURES, EARTHQUAKES OR
Record / .trength of skilled workers of
different categories whose services are
required during emergency operation
should also be available
Officer should keep a list of readily
available all types of stores under his
control along with available quantity of
each item. He should also apprise SE
(NMC) about the same from time to
time.
. Officer should also keeP a list df
alternative arrangement in the absence
of skilled workers readily available
Officer will ensure delivery of all
material/stores quickly for its use at
emergencY site
Officer will make arrangements at
shortest notice for the materials from
other projects, if required.
@rent agencies / offices as
per notification flow chart of particular Alert
level as Per situation at
9.15
XEN Bhakra Mechanical Division Nangal
01887-223038 (R)
Reviewed and APProved BY
DirmrrsisnPrepared BY
BHAI(RA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
Doc. No.BHDIDESIGN/EAP-Datezl}-01-2019Issue No. 02
Page.63 of 66
Pase Revision No. 0BHAKRA BEASMANAGEMENT BOARD
ffi ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF ITYDROLOGICAL
FAILURES, EARTHQUAKES OR OTHERS.,' I\,ontrolleq
nraintaineO in respect of each activity
carried out at site by persons under his
control & to aPPrise SE (NMC)
XEN will ensure the stock Piling of
lubricants & spare parts at site where
the machinery has already been kept
permanentlY.
XEN should have with him a list of
machinery (Required by him) available
at other Projects under BBMB along
with operators (Annex XXll)
XEN should have a list of suitable /
required machinery available with other
departments such as XEN, ASHC, RTP,
XEN, BML, Patiala
XEN will ensure that persons who have
been assigned different duties during
emergency hour are discharging it
properly & PromPtlY'
XEN should keeP close liaison with
XEN, Bhakra Dam who is overall in
charge of the site for all tYPes of
assignments / requirements in relation
to execution of work
XEN shall also ensure attendance 24
hours during such exigencY
Reviewed and APProved BY
Doc. No.BHD/DESIGN/EAP'Datezl2'07-2019Issue No. 02
Page. 64 of 66
Page Revision No. 0
TTTTN.XNA NANGAL PROJECT
INTEGRATED MANAGEMEryT ITITEU
HYDROLO GICAL FAILURE S, BARTHQ-U{iI*P
TITLE, EMERGB|{CY ACTION PI'ANFOR
HANDLING SITI]ATION ARISING OUT OF
BHAKRA BEAS
MANAGEMENT BOARD
i e.i6PMOBBMB HosPital, Nangal01887-223102 (o)
. Xen will ensure the immediate power
supply arrangement to Radial gates if
existing arrangement of supply fails ( As
per para 4.5 of this document)
;- PN/IO wll immediately move to the
emergency site for assisting in rescue &
relief operation after getting information
about such eventualitY
. PMO will move to the site along with a
team of Doctors and other allied staff
well equipped to give first aid to injured
persons
. PMO will keep a constant liaison with
CMO Anandpur Sahib, Kiratpur Sahib &
RoPar and NFL if some Persons are
required to be shifted there for
immediate medical services / treatment
. PMO will ensure every sort of aid to
persons which is available in any of
nearbY hosPltals / disPensarY
He will try to make all arrangements in shortest
possible time by opening temporary dispensary
at site with the help of XEN Township so that
immediate medical aid be grven to
nevrer reO and APProved BYl
I
l
IlI
I
I
I
lL ., ---, --
'":l::
6,
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
Doc. No.BHD/DESIGN/EAP-Datezl2-07-2019Issue No. 02
Page.65 of66Page Revision No. 0
**llS"la*%Lqffi
'{ '}r '
BHAKRA BEASMANAGEMENT BOARD
TITLB EMERGENCY ACTION PLANFORHANDLING SITUATION ARISING OUT OF
HYD Ro L QGI c AL " ^JiHy"::, ^"83fl #fffr 8dt
. victims at the site of emergency
. PMO will immediately make all
arrangements to refer patient to PGI'
Chandigarh if situation warrants so
. PMO will keep record with him of every
person who has been given medical aid
by BBMB temporary dispensary at site
. PMO will ensure a complete availability
of every type of medicine in advance,
doctors and other staff for extending
helP during the hours of emergency
. PMO will arrange to provide 24 hours
medical service through his staff at site
of emergencY
PMO will keep constant liaison with SE (Ha)
and keep on apprising him about the situation
at site in respect of rescue & relief operations'
victims or any fatalitY.
PSO w'll ,rrange to inform /notify Bomb
squad /Sniffer dog agencies as per list
attached at annexure Vll in case of
sabotage.
9.17Project SecuritY Officer01887-223060 (o)
Reviewed and Approved BY
Direc\or DPign
Prepared BY
ASE-I
.^ lssped BY
\MefldRf
BI{AKRA BEASNAGEMENT BOARD
Prepared BY
I}HAKRA NANGAL PROJECTINTEGI1ATED MANAGE,MENT SYSTEM BI{D/DESIGN/EAP-
Dzte:12-07-2019Issue No. 02
Page.66 of66Page Revision No. 0
. Seeking any help required during such
emergency hours
. He will arrange guide all the persons at
works site to deal with such situation
(Bomb like thing) through his team
associates under his control.
. He will ask any help required during
such emergency from SE/HQ/SE (BDC)
BBMB authorities He will remain tn
constant touch with ADGP, ClD, Punjab
. SSP Ropar
. DC Ropar
. ADGP, ClD, HP (DSP/HP)
. S.P.(Una) and ,S.P.(BilasPur)
. He will ensure that Persons under
control are comPetent enough
controlitackle such a situation'
He will ensure that incident has been recorded
in the Event report form as per Annexure XVll'
Reviewed and APProved BY
his
to
TTTTI-N JUERGENCY ACTION PLANFORHANDLING SITUATION ARISING OUT OF
HYDROLOGICAL FAILURES, 4,\RT4QUAKqS
I
II
I
lr
llti
I
tsu<t-JA&6
iu<N*JJ
+Pi6 *H
jr!{a
rir!1:
iiii.lt.!l{;ililil;iiili:iili{!tiii
l;sii!
I
lle4_t vEo\ ZZe € trU$..rF.9-RA-ata-- o'.
-: l-l -r- O t-r oJzQlz=e,iEgEt!9!9HrY:tquLr
^nAv)^ht lfi H !l ir'l H
=
--.''-.".-/'-- ':..-
i/&y,?'l ( (
$)
'r ,:i
1,
I
7;'r.
*,,/'l'6al
ii
*l*,\
l
afrlV4
3
rrl,dkl
Jtu
Z,rr<zt-)^&a9&?E
7O
l< (,l.zlQalzDlz1lYz16 ctz 3lFr 3lrr FlF cn
l3
zHFaal-rztrlari
zzt.lF
frlF-rz
3Utrl
Fl
rrlzz4
r-..1rV4
A.\IEH-2A' de' \/4' <i;i-l \-/4,1A\,rz
z
C.9,a8+-Ll
s<E6i5
^&m
co.t5ooLo_oroC(s-o0)
=c)'=o)t
Brfriii, Lli I l;1.,-E'lr i lvl iir,l
S I liliJ{i}i I l5li1d;' H$!ii
l,ni:
tq
I
t*i ?I-t !Elo\ Z2Z 6 trOT..r€.9-NA-acDL- O'-
.:FlI d.q 6za;2a.il.jeg 3 $t!O:! cq ? c{ c(A M A g] A A,HH-
i,l
ir:L ,I
*rrr1r-\.. - ---\'i '...
(t€)rrl
-',oiE9dEle f;_oYHY
*arrHr-. (ip7cZ&a<4a-t7,'")I.,D
i)fr3a
zht
z
hzrl
z3U
U,Zkl
..
trljFi
IF
z,r!F,a
ir i"=aa'z.r'3)AAJIi<O'zz7>.
XF
HF.z
;!'a{i;r.iit ..--11 ri',:ili'riil.i
t_,1{,!il
iil{
iiil'!
.tf.
II
Iii'i.iltli
il
Fzt-
z<czzA-\<xEl*H
r
1i. d@
d
tru
t
co]CooLoo-
Ec(U
ooBo)'t0)t
co!0)LGo0)L
L
f1*1ffi"*:*u-
'L;r:....',,r::,'
BHAKRA BEASMANAGEMENT
BOARD
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
Doc. No.BHD/DESIGN/EAP.Date;12-07-2019Issue No. 02
Page. 03 of 88
Page Revision No. 0
rlrfnt EUERGENCY ACTION PLANFORHANDLING SITUATION ARISING OUT OF
IIYDROLOGICAL FAILURES,E ARrH QU AI(E s o"c6Etl8u.
O
)" tt. ,,cla..'u. I ,J
i&,^, ('")' \{ \'..r \ \ ..{z
*of .,'... \1"-)t' . rY'
-"1 )t.\ '\ >,1
'i'ro
.,.,'{1t , 1"'' .11i,;:'f $i"'i'iiii'i
+
" " t$i ril'ffi
''11-t:ffi'"''i"'
-. il
t'-rl;1,Jl
','" "t' i""'"
tt ii,l
:,::u
.,,,t\)
6ALLEflY SYSTIII
SOlTl',1AiIC L,{YOUT
Reviewed and APProved BY
oi,"ffiu'isnPrepared
ASE.I
By
f,
I r a.-._.
i&*Tilk'qq.*;;;l*-
' .: .:lrr".,:.':''
B}{AKRA BEASMANAGEMEN
T BOARD
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02Page.4 of88Page Revision No. 0
TITLE: EMERGBNCY ACTION PLANFORHANDLING SITUATION ARISING OUT OF
HYDROLOGICAL FAILURES, EARTHQUAKES ORorHERS. Coitrolled
Annexure-!l (i)SALIENT FEATURES OF BHAKRA DAM
BASIC DATA
Name of Project
Type of Project
Purpose
River Basin
LOCATION DAM
Type of Dam
Elevation at the top of dam
Maximum, height of dam from
deepest foundation level
Maximum height of Dam above river bed
Length at top
Length at bottom
Width at top
Width at bottom
RESERVOIR
Maximum reservoir level
Normal reservoir level
Dead storage level
Gross storage capacity at El.1685 ft
Live storage capacity at El.1685 ft
Bhakra Dam
Multipurpose Hydroelectric Project
lrrigation and Hydro Power
lndus
Near Village Bhakra, Distt BilaspurHimachal Pradesh
Straight gravity concrete Dam
E1.51 8.16m (1700 ft)
225.55 m (740 ft)
167.64 m (550 ft)
518.16 m (1700 ft)
99.06 m (325 ft)
9.14 m (30 ft)
190.50 m(625 ft)
E|.515.11 m(1690 ft) .
E1.513.58 m (1680 ft).
E1.445.62 m(a62 ft)9621.14 million cum(7.80 MAF)
7189.33 million cum(S.83 MAF)
Prepared
MReviewed and Approved By
ASE-I Director D^esign
BI{AKRA BE,ASMANAGEMENT
BOARD
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02Page.S of 88Page Revision No.0
TITLE: EMERGENCY ACTION PLANFORHANDLING SITUATION ARISING OUT OF
HYDROLOGICAL FAILURES, EARTHQUAKES OR,THERS' Controlled
Dead storage capacity
Catchment area upto dam site
Reservoir length
SPILLWAY
Type spillway
No. of Bays and size of flood control
Gates
Type of gates
Maxirnum overflow through spillway
lncluding river outlet
Crest Elevation
Effective crest width
RIVER OUTLET
No. of outlets
Size of outlets
Shape of outlets
Maximum discharge at head El.513.SBBm
(1685 ft) per outlet
i) Outlet atE1.402.336m(1320 ft)
ii) Outlet alEl.432.B16 m(1420f1)
Type of Gate
I
I
i
Annexure-ll (ii)
2431.81 million cum (1.97 MAF)
56876 sq.km (21960 sq miles)
96.56 km (60 miles)
Overflow gated chute
Four50x47. 5 ft (1 5.24mx1 4.48m)
Radial gates
2, 90,000 Cs (8212 cumecs)
E1.501.46 m (1645.211 ft)
4No.15.24m (50') wide bays=60.96m (200')
16 Nos in two horizontal tier of B each with Central
lines at
E|.402.336m (1 320ft) and E|.1.432.81 6m (1420ft)
2.64 x2.64 m (8.67 x8.67 ft)
Horse shoe with flat bottom, vertical sides and semi
circular roof
188.00 cumec (6638 cusec)
160.13 cumec (5656 cusec)
Jet flow fixed wheel tyPe
Reviewed and APProved BY
',..1,'.i,'t'
BHAKRA BEASMANAGEMENT BOARD
BHAKRA NANGAL PRO.IECTINTEGRATED MANAGEMENT SYSTEM
TITLE: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL
FAILURES, EARTHQUAKES OR OTIIERS.
Bhakra Power Plants
Number of power housesOriginal installed capacity of LeftBank Power Plant
Present capacity after up ratingOf Left Bank Power Plant
Original installed capacity of RightBank Power Plant
Present capacity after up rating of RightBank Power Plant
Total present capacity after up rating ofBhakra Power Plants
BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02Page. 6 of 8tiPage Revision No. 0Annexure-ll (iii)
2
5x90MW = 450 MW
(2x108+3x126) MW = 594 MW
5x120 MW = 600 MW
5x157 MW = 785 MW
1379 MW
*ln the special 139th meeting of the Bhakra Beas Management Board held on 29th August,
1990, it was decided that the maximum level of Bhakra should be kept as 1680 ft for the
storage purpose. The criteria in vague for the filling of Bhakra reservoir being followed is as
under:
The reservoir should not be filled beyond
i) 502 .92 m(1650 ft) by31st July
ii) 509.02 m(1670 ft) by 15th August
iii) 512.06 m( 1680 ft) by 3'1't August
And the filling above this level should be attempted after ensuring the due safe
guards.
Prepared
ASE-I
Reviewed and Approved By
I0)l!-lrlx
1e,l
CI.s, IaioolE\-]gato
coEq)
oLooEc(0-o0)B.q0)t_
z
4
t(
az3
z(,
Uzti
Id
rd
trl]E]arit3klF]
Nc\<J_\ -t
co:o -TPul6u)IL
E
!o\-/ >\tscnolro
q)(t)
(no
trAE .:PO)-r\J9/L<r-\r(s
.i.=-J, o63i
= = o CA-Y -!Li '\) 5 _ hE-.o.!-uesEEtraE*€= o.;- ^,4 Errt cd-C c)K=eE{EEilnco5€ 9;i.3€ -E E ^aZ. A-'\,) a Z- <) Ia:F 1r. ;d
:=v*6i .a
I
o0!
U
oo
bD
kl:llaOl
.EQ I
oo E sl: !.il.= o cdlL O- Fl-o.E UlO al El* \ (ut^#I -<l srlL u il:. > 6loo x (,lcX9)::€ ebo ,. q=0-) bO=9du$* r-cJ o.) .=cd - "'_Bd k-v oo9OCC)
; b.=c >=()=co^ V A14- F
aa
P e, n E fr?E '6.e E t i dEc):'i-X.c)>.cg-t.)EE9.= i ==co==-?\o3dq.c :i :EiEE9:;::g i qE>'60;'E+e-E68 ; t=akSHEiIi f : e':E;€= eAEEg; 5'E;FEH?sE>r .-r .e/ L n
E i =: -= 3 y; r u E eEo., c o tryt u? U U g),.= EtF-?3H€E:$:€i-3ri E E iE ; s 3 E # i, E E q.
?EAEtsTfiE;3tHE=€;f;E=ri;EEiT.33t = fl o, [o:5 !I)q; ti I I .9 ,n S * ii 9^ 9P: LEEvZE:;;-E;PS€A
HaE?E>"€SESfsrEth S olo- D i.'cz: >,l- -- - - r) a a a a aa) - u A-z c th i-)
t cg-O (.) 6or3 0 > >
Lro
Eor4
ao(sHoCd
qr
oIo()PC)
lelcdl:=I()IH
H
lolzO
li 0)
v,(J, t
I
lflvJAA
fro\ ZZa troq^=.9ER^wA(, - - cH'a
;EI2:-A?Eesr,r,oiJi c! a cn c(arAAEO..o,.
zI!F.(n
i>YalJl-
AZtl rr)
Jti<(,zzz,>&e)V t-',.
I t-llFt7,
Zlr<zn"jil)n
E5t? &e4Aei*u)o- trr |lzcY
lt.'. =
cl< \r 3\afr4lz7=llql zt At9; eln;^ =IA F Elr, < <l-': P trlE F-
l?aIF
A-ilAA*X
-:H.{*, co F"r"': <6
-U,.' . 04 "a-l'": g *<HE-l V!4a2
.odA
P=)<
FEg.=aaAtr>,A a(/)(-)
\2 E= z E=eZ =i '= A.:>T. _ (.) )'i - cs cc
- <g >i ,i -l cs oiJ.na-aL.-s ! '\ \/ L- b= Z'zoXtti;E:=-;EEqE}Es 35 *i g: € H I E qi , '2?; c..i ..i + '
P
E
()-oaa
E!0)
cd
aocd
r-l
a
EE EHE E-fr 83, 6P.E't.'|-'F/-c:5; =rB : e E-E HEE€ ?1.a t'oE E g -.! >E€Ef;
=s =ne ;3+ #$ gEg*Eg;.Eif a:=;i $ertrE:.i'€{ €ri';EE E3r5i;ryqP5; -*'sEq"-=foi+*E E: E ; E I i e; ' * E
IfiIE;E ;fr€E$Ee:E;i*+;EreI ;i ;[:tE;iE;$5S==EE.*EEi;lf'erbeE*-o 9 - oo.gsE Es i: U 3 3, 3..: ;iIeHAE=surs€rgr**Egy=Le,e3 35€;f fr u i=-:3efrH-V. . . . ... .x o.blJ.] 5 O
COcc .9)93oOes\p(XhNo0)B0)'=c)t
co:o -TPut6a0)L
o_0)
l.oi
I0)
Nq)
zlr<za"j</vil,-l A ll
?E5,)ticf)droriI{-{FXCY<ur-il>Zxiu od 1V=4 -^n1(nY'z briu;)iak?
l-': P rrlrri 3It otr
) ._ _-__
?-f.]3,(t
YalJl-
cz*. tr)
F.l ll
ZZ7.>dani4X3
B]37;
a
Cn^<Yul:tr7,:a
;>?H;\,a2
z,
z
a
bJ
I
t-l o,ZO9inE(2L-tr
-.El I o v
iQ?z?..;3eEtO ;ri .s ? c,i
a..aq)utlJu-t&
I0)
X0),t
(uHT
tl,!{t
{
coE
za
0)
q)bl
I
I"l o'ZOOT.rf-RAwCn--+i
o E..r; ^z<a1':,iaEEt!o g.,i cq ? c6AMA.,.iA.!gH-F
coro0)
oLo-oEc(sroo
=oo)
l(_
mE-To iltka0)LI
"o
6FbOtr>,Q ACN
.B= '= d Fc B t-E EterE e* h= E ec isps6 a# EE E €a EE:h,: ri-EE'-: 'Vn1E**€EiE::B'-8s5 5=El+;E! EgE E. . ' ' ':'i7 > HC-tr'cg ):E
= ['6 #E 8 > o E
* ..i .r + ,ri
Ee I.r E-+ q Eu .(;s 3tE:'EU E" E*-U EEE E-s;;#a, 1e g*T, riE I:AEIe'.Ei" iIu *
EE aH??SEegg EiE :sr*irA!g3;sg.;;3=Eql6os-Bh?
ii;E3'g? iHEEEE :iEg;iEEE f,IEEf,# geE Eaif,! ! ilEg[;EsItEsflEaEEEEsElE H H j o ' ' ' ' 'l2 *el.E a.t 6tchs o
E
aotiC)
b0oEOa
()til0)
la-oIO
tal-VtolcAt!lol,<talcJll&
(.)bo
q)L!0)H<
Zll]<znYi
&^39 /,,v425i iJi r/)o, fr r.\zcYlF-', X Cl< lr 3\zaxlzlPlB < nlY z7lkl t Dtz 3 trlFrstl.': , Er1E HIF U)
lFi
atHILilaaFzHzf=l
z
HF
t43z
3U
J
zz
l?
AHn-t
A.\<X+1 'A-
tZtrM=i
. x,t Z.* .'ldH,.i v*4a2
-lz
co!c)
oLo_o_
13c$io0)
=G)'=q)t
SZ=coc-TP r.!oA0)L
o_
'o*g()trI:
iO e, !{.5EE
(, l-r>.o
>'
I,oo o.9i a c..rcdll(d7'p u
OH2Ci 0; U ';=iJ>.=M 6) r) d H
==<a
-o-l.=E.: cf*crs HE'eg 4Ef;Eu=EiEE=i:Bii=gr-itrtrcad2..!58 trEEcf.E.,g.g3 *EEEs€HsgsE
oOOOOO
aotiC)abI
c.)E
(6
a
Cd
cda)$<
-o
oco()OI
o63a
(Ji
io.q 6)P-d
".oo= >.ts^H*t tr:=H 2(E oi q- Efr-or-- aP c\o ooii 63'- C
:.1 Gl (g
d-vZ().= '.= " O.
9otr:'atrPoc.l
;i ^'e
cdaaa
.;<' a -6='*R-LU-
Y-Ui;!gAn).)a- a Ca--sdy,xF 2r-4:s Y (*6V
(E'= (J a.-F()()
=IoHS(JX,;:rJ O. () t-i
o
()
cdli(_)
Io
ac)
ol
a(J
(HoO
c
30J g-j g: E .2'Ff,Lfrl
H=EEs' Ea 9 EooEldf .9olr -6 i:E o n.a T1 E c +3ie =+ F" o ;.o9oS i -- .3 6'--.;a.j_.'i^aX->cooCuaXcE-:ocr'u
Xo-. b !> i= -oY tr ooo !: =o
cr'-j F o-o9: = w s;j;q9;3=g I re
'-AEteeEii n =
r-1 8.,=i-E=4,U0)*.9= 8=.<.E'a! c- Hts * - 9.5u a a= 03 3il
Ef=6cyi'Io,E E E:X=€s;1=I = E7 tr E tri;J - oo c cd'E - 3 >.':ii b -.4 I - B
7-iots-oooE"'"o';3DE#n:iE= $+H; s E: g H F A E * ;,€lt.6 S3.=3-a -g.g;.-.9':9?E3?Ed ,.re.:.EEg=sm=:EHEESE5c1;u'Jdi'6 'E=.!l+
q)
q)L,:oJ
I0.)
x(,)
z
a
obJ
A
O€T"rFr-a=sz=g3y.A 3s
I
rizaE]
QzO
I2e
>o*a)f;r. !-l
!Fr
H5Zea<1A*ElZ,*Llp
'l EL,
t-a
zIz
trz4Oi
z3
]Ut.-1/1U1zlri
IEii !.rI /',ti:lr
t-r
Ft_
aklt-,a
YaCZ*a)*4.Jkl<(,27,z>,{oH IJJVF
frl3z
O.\<xLrl -CF<acd <":/4?H*z
z
E.q,a0)
mioooLo_o!c(s
Eo
=o),=ox.
coCT(l) iltk(n0)L(L
ll -? >.d -v>O.-1Od-.t
-.ij=-As €dt>.lJrd.avO- cg $.l ard, 9e<gg'caq' A'E E 3 Hr,.AfLu#!S X.: E.,\
e:s; ; iu : ,sE e=
EE=E € [i € erI gp
EtcA E E€ ; EE! :€iEai E EI : *g? ilB#EEE E t:.aa Ec: ue
EryEsi E :gfE H;3.EEg.,trPE,, ; 'i3o=.o 9=E *9IIi:I i=Eei[.iiE g!ErE:!:€€srgiE;I € B
='gE B
*r;;3#drEia$rrfrE -tEEflEEEAEIF;iEEgEPE:E
Pr
oF
ao
-a
c.i+1
oliC6
a
oda4
lilcdI
l,rI
INlool\Ol*Ilat'-I
I !-.,1l{t€l&
Iq)
X6)
alr.l I
Fdlal>laF.(zklafrl
zzrdF
H3z
t-(UF]
i
zz
L!l<
za
0)
o\e€TerF
l- OiIZ*I3r,c!?d
I
tiza
: [r]z<
Zlt<2?i<xE
9 &vizci iri u)o, tri l-lZC\lh 6 gl< U r-.1*2ill0 a <lzl=1tx < n14A*I> F Elr4<<l.': F lrll:i frlJ ;-,tl?aI F-<
n&(-,/
tft
Fzrrlztr.]czZ
09..1
!.1
u4ri
l,r.l
U)o-ob
65 00
Hotrx o0(dE Cdn.L€-aOa)-* 'i?Ubo6) o.=boe-oh0.)oH.OEo'd-;-=o=e.:l qR oJ
^ -- A
!Yu:g9UEVUiHA**:HUU.i
a
zrr<2iei!r--]Atl
c(Et*tuA,v?E6J*cAcrI.14'-CYtsr-{t-,, X CYoH>zeoa{zpnF,l'41 O9;nI!I'D
rrk?rat.l?aFr
ljtal&ill i
*sie$i
zf-li-(
-?Y-aoztl. tr)t4 allri<(,()<zzzzn-M t-.
fEltiz,
H
(n ^;-<ElL] :COF<aa/ i)u=IUn2
z
zA)
(,)
obl
I
F{ ort-- -ZA 6(l$*-r€
FNAqA='o
EEsEr.rag3g,oiJi c{ ? d
A.A q.t-t ,rt t-t - Il
mTO
0)
ooo_
ocooo)
=0)'=o)t
C.g)oq)oL
oooL
5
={€eco-o -:-9r!GA(DLI
t=-am)>Eld
w
Co),a0)oLooo'L
i-
coE0)
o!o-o_
oC($ro0)
l=l0)l>t0)IE
^*co'15 -TpLu6aoLL
I0)
xc)
itt.."exH I lx#
/, I !
il;t:,rEt!Yllielsl
I
; _..l* I rili ;l
*t; *ir
1-I
i *{.)l:1 r,
H43t I
l'1 4l t
i +i I,l ''!i I
'l *
*'1-+ v
&,*
t?
Llfu*
r:l-"1,
n
.e u!iI I'i
""d
nt
--r*{+
I
&
" I**]!::J
xsL!
rial
!k
***!,Nt:-r.i;;.i+*rEr3i'. ,l -l'
rs*j:hq -a*
iTL*
(!sTtle
:;E":r*r!
fi*l' lxr
ii\
i'J 'I
ti.{
F]
FrI1JFl
zHrrlFzat-.,j
\M
!rcaF
HO
FlH<
zoF()fJr
Fz
u --:i* -o'it{t "--,#.' r**
i'I
)I]
,/,,
fl
zah
q)
o)OJ
I
tl a'Za 69T".rPtsRAhv)a . v
dE.\93iEEE u,o 9,1 cg !2 cg
eFqAEPr
Z. I
l<2?*rl\J|.1iCEr(l'a ?9 &e
<83O_ Er t-i
lA r- {lil x cl< (l F<
lzfrilzp*1ti14aIO * HI n '2, t4.
Itn U Dlz Fi ltIr4 3 3I_': P lllE t-'r
llalFr
\3 IalHI3l. (r)l
Y a,llIIl-
AZ&. g)td €.
<(,o<zzZ>I< alc 6lV t..l< <Itr trIEnlr'.tz
al&lc9.1
FzF]
rrl(,
za
a.a,^<
E4ifg
I(,)t<
Nq)
mti L!
r#
k, 11r,hm n i wtailr = ury a
H il +i i:.^15 *1 .,i,tAf;i llitl U' lL
$n gH -*n -3 -{l
Uut ru -ila t] -9 l-J l!lln /,4,'i r-!' f.
dU j gil
,H Hit ,!ft ufffrf, il u Lrr
;{ N l'
ul
pfi litl '- r.fi rr
l1T "N lfEm
la,
,t;i !
H ; ^' u',i)n {l ll i1
ut;r'a;
d
E{^Cn.{qftTYut{bJ.HilHt- F"l
iv'(4'lre 't'1
Lrl,.kJfrN'a 7,
r,,
'1,. il^ c !flu I,, aiiFl -lJ*r :il
dF: a! lrJ:l-{ il ra h .- !4 lllll * ,.Ur nri liH# iln *v nZil ll 'uH _,rJ ?.,
[ri i{ ii;: sc' n b!q i:;^tn!U Li D-; 6.,'f, iil ,#fi,
q{ vttd d urr
il,s EHE E qd
-I r i!.1rrl ilrl
C.?a0)o
E-.olH
c0cc)
oLo_o_
!C(I,
!oBc)';0)t
di.t
t4 r)(.J
jrq
g
d l-lnTr
,r,
+i n
llli l,ln - rqH
ill r,
L]lq
& q r,
ilon'j
4.,o o i16Int ;i
(Jil .tu,,ul r"llr
ot :1
n
UETin f d l4.l! tlt ,/,.,t! il
lud",
i,r nt ri ,il il';l
"Jl rlt' li e 'r'ri!t,u ii ( r.i
H ! ll r1r t'rili rJ ^l U 4r ,li ,ln I li,l !
{ ill .!rlr J sI
UJa
c0ro0.)L(Uoo)L
o_
IA- I4\i<q zZo 6 trU$.-r€.9AtrOE.9
,EI2rP.rai;3s,&OiJi cg ? cd dA AA A O?
^ A,- -rl;l
er!3
F3=aCZCH
i.J f-l<(,zzz>{arlEIX3
ri3z
qJri-v-7s S
11r /'., .: !I-t \J .^i i-av)lA|i t4 a,rlr?! i.-:^lJftY''trEEi1 F
<ne"l*92o- tr 14
;CX2ir-{?- -a\ O< l, t-r- z*,6a?z7A74r,9;e-^I:
rr3?E! F<
?at'"
oc,
Aa\<xE]HmF<atY. t4E*<iitsri V*nm\*z
zl\z
Htdt-tUI{H
r-1lll) li\aLl?a=l='1 rHfrllLg l
Illl---lI
lcol=ilo 1iA BO-ao- 0)l<olp b or-Lfi !-{ I13 L)l0)l't
o)l"lt_-tl^. iI.-\f&o i1^J:lmlo-ri19 ur l
$A
t9
l"I
t
I()
XI
'l--l ---i-,.l l;,i
li ffiffiffiq$$ffir lfu*'ffifur
ffiim H l,t,llHtd,h'lHlffit ::i,ui :Ell i,
n ffit+lffiirrffi:fiffiie ffE'qffi,#r*ii*it
rriEs6 \:iffirq4:l Fui,i
Ifi ri *rur?. ,HHt{El i i nl
t. \1itrffi,$Fil+*uFp? HTflffi['fl ',Hi"i
B 1?3#ffi;ltfl.
za
o
ol
I
I-l a,Za oaU$^aHRAka\- o
;Ef,.ilnz,?ez.-.;3jj3EOrli cg ? d
AMA@A
13arc3
-?Y-a:'.t.CZ*. Lr)
jri<(,ZZz>{oVFr
rI]t-,iz
at.l
Fr
at-l
F
frl
ard
zaJii
zn<-l
fri t123+/i
Z>?tu
>pZrafr,2*al'1 -z<H7#CF;-P
a
!
a-j<xolc0r<6cz?tl*z
z
H:5
JIt
ttn,iJ
x?
9:
ic
o
3>2F-19!i
-1T-lli lo I
i I lI I
tElI =l
3f,
,l'ni
J
o!
b
i!
f
o
" I "i "
E
!E 7t
^l
1
l
:<:J
?a-
U
La
s
o
i
U
l
o
tJ
i)(tII!ir
riU
)oa
oF
U
ta ;r uCoi
l.l!lo;
o
!&';o
5@rn
O;:E
U
It r,
l!;..uo;
_.1
"ll.ttl+t
L,t
tu6
(J :E
qiE
!
;o
t\
5o
a
a
U
-T*'L - -l lo -E
-t,L
I
J
l,llq6 I
L1
=-t .
I l;s !l7I;! |
il l
i4 |
ri I?:1
E
-AXI
aE
xi-lto- li {
ll:1Il.-
E
o;:oO:3
;9
,o:FO {l
trl--]
-.1
-1
i:I'f
I
.'_l^-t;al_r l^!:lx;!
thESI rsIL__
t;
OIoo
-ttli j
F
vioa I:
E
J
,0 L _-llz i
_J-l .! I
-"-J-3_ I-r li:E I
I ld;o I
!e6
r:1rrq<6aEcA E
F
o{.:
{o
oE
6a
illc
t-s I
:l:ll I l.a-J l^9
I
ql
!-
Fr
U
l_
t!
a
o;npo
ILt-t,
!0iq4i,3E!a
d
n" /\ll Lt\1..' l,lt: /
r. ';(-\d/
)r.. !.,1 ,/(i, +, t-/or/; nN/ \,A\
Fr;
qai
:*{E c.5
I0)
Xo
L'ooL
coo
a'gE
o
dY
IoF
z
aa)
I
Fi a,\-l
Za 6U$.r€HR LCD:- O
EE*,:dae=$oi.l cq ? (nAAAq)^l-l Jl - )-l I*(
Fl
9.,
*arr. rrl
F,l
Z&6<1AZer.l D
PfrFra
zl]
z
/,tuz
z3U
(,zkl
ztitlF<
F
riF<
-?=aCZe. 9)AAFl fn
zzz>{o&aX3
rd3z
A.\<Yllt_aoF<aJZ?H*z
.2.
c0c0)
oLo_o_
!cG!o
=o,;0)v.
coE0)L$o-o)!
o_
BHAKRA NAI{GAL PROJECTINTEGRATED MANAGEMENT SYSTEM
BHAKRA BEASMANAGEMENT BOARD
TITLE: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAI,
FAILURE S, EARTH QUAKE S OIBTFS&EA
Doc. No.BHD/DESIGN/EAPDate:12-07-2019Issue No. 02Page. 17 of88Page Revision No. {)
Annexure-V(l&ll)
lnternal Alert BIue
Narrative information listing of persons to be notified by each individual as per NFC
i. After knowing about the occurrence of a disaster JE will make single call to SDO
lnstrument & SDO lnstrumentation will make four number calls as below
l.tcalt to XEN Bhakra Dam Division 01887-223075(0), 9463998256
2nd call to SDO R/M 9BB2103103 (M)
3,d call to S DO Permanent I nstallatio n 01 BB7 -22321 9(O), 9465225304(M )
4th call to SDE Dam Safely 01887'223140(O), 9463598397(M)'
SDO R/M will make a single call to XEN RM/SR, 01887-223092(0), 9463998256
XEN Bhakra Dam will make seven number calls as under
l.tcall to s.E. BDC 01887-223017(0), 01887-227000@, 9468177095
2nd call to Chief Engineer, Bhakra Dam 01 BB7-223001 (O), 01 BB7-223024@, 7888697174,
3'd cal I to S. E. (Hq) Nang a I 01 BB7 -2231 64(0), 0 1 BB7 -223237 @,941702 1 604 (M)
4th call to XEN Bhakra Mechanical 018872231 17 (O), 9417202040
Sth call to XEN RM &SR 01887-223092(0), 9463998256
6th call to XEN Electrical 01887-223094(0), 94639984'19
7th call to Director Dam Safety 01887-223179 (O), 01887-223089@, 9463998230
SDE/Dam Safety will ensure that messages have been delivered to
2.
3.
Reviewed and Approved BY
Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02
Page. 18 of88Page Revision No. 0
NTNXNA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTBM
0
BTIAKRA BEASMANAGEMENT BOARD
Tnrn' nntnncnNcY ACTToN PLANFoRTIANDLING SITUATION ARISING OUT OF
HYDROLOGICALFAJLTHtHILtTffiSTff '
Annexure-V
each individuar as per rist and wiil make a singre cail to Director, Dam safety,01BB7-
22317 g (o),0 1 BB7 -2230 89@, 946 399 82 3 0 (M)
5, XEN RM/SR will make a single call to SE, BDC, 01887-223017(0), o1BB7-227000@,
94681 770s5
6. XEN Bhakra Mechanicar wi* make a singre ca, to sE, NMC o1BB7-223004(0),01887-
227062@,9417202076
7. XEN Bhakra Erectricarwi, make a single call to sE, NMC o1BB7-223004(0), 9417202076
B. SDo permanent lnstallation will make a single call to XEN Bhakra Mech' 01887-
2231 17(O), 9417 202040(M)
9. S.E. BDC will make two number calls as below
1st call to C.E. Bhakra Dam 01 887-223001(O), 01 BB7-223024@, 7888697174'
2ndcalltoS'E'BhakraPowerHousesolBBT-223261(o)
l0.ChiefEngineerBhakraDamwillmaketwonumbercallsasunder,t,t cal I to M embe r/l rrig ation O 17 2-501 17 52-53(0), O 17 22661 499 94 17 022944
2nd cail to CE. Generatio n 0l BB7-223355(0), 01887223146@9417216056
lssued Bv
Nffifi-\-Reviewed and APProved BY
Di,."y:T.is.Prepared BY
BHAKRA I{ANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02Page. 19 of88Page Revision No. 0
TITLE :' EM'ERGBNQ}?ACTION PLANF0RHANDLING SITUATION ARISING OUT OF
HYDROLOGICAL FAILURES, EARTHQUAKBS OR
Controllefl
BHAKRA BEASMANAGEMENT
BOARD
Annexure-V(l-lll)
lnternal Alert YellowNarrative information listing of persons to be notified by each individual as per NFC
l After knowing about the occurrence of a disaster JE will make single cail to SDO lnstrument & SDO
lnstrumentation will make eight number calls as below'1't call to XEN Bhakra Dam Division 01887-223075(0), 9463998256
2nd call to SDO Hydrotogy 7973205990, 9463718386
3'd call to SDO Reservoir Management g882103103(M)
4th call to SDE Dam safety o1BB7-223140(o),9463598397, 9815553455
5th callto SDO Discharge O|BBT-223173(O), 946399g1gs
6th call to Chief Fire Officer, Nangat O|BBT-223101 (O),
7th call to sDo Permanent installation olBBT-223219(o), 946s22s304
Btr' call to Photographer g41Z SAgl 42
2. SDO Hydrology will make a call to XEN'HydrologyO1887-223083-0, 7589303748 and another
call to SDO lnstrumentation 01887-223045,7589303795, in case he gets 1't hand information
about the disaster.
3. XEN Hydrology will remain in constant touch with IMD & catchment upstream Bhakra 011-
27662607(tMD)
4 SDO R/M will make two number calls as below
1't call to XEN RM&SR 01887-223092 (O), 9463998256
2nd call to Supdt. Procurement 01887-223011(O), 01 887-227400@, 9463998419
1. SDE, Dam Safety will make two number calls as below
1't call to Director, Dam Safety 01887-223179(O), 01887- 223089@, 9463998230
2nd call to ensure that messages have been delivered to each individual as per NFC
',T:::
MReviewed ,nd Approved By
Tzl'"''',"
-tI
I
I
I
gUAXru NANGAL PROJECT
INTEGRATED MANAGEMENT SYSTEM
BHAKRA BEASMANAGEMENT BOARD
FATLURES, EARTHQUAKES Oi oqlq
ANFOR HANDLING--inua.uoN
ARrsrNG our oF ITYDRoLoGTcAL
6.
7.
B.
Doc. No.BHDIDESIGN/EAP.Datetl2-D1-2079Issue No. 02
Page. 20 of 88
Pase Revision No. 0
Annexure-V
sDo Discharge wi, make a singre cail to sDE, water RegulationoiSST-223043(0), 9694096244
sDo permanent rnstaration sub Division wi, make a singre ca, to XEN Bhakra Mechanical
Division 01887 -2231 1 7(O), 9417 2O2O4O
XEN Bhakra Dam Division will make ten number calls as below
1'tcalltoS.E.BDCO1887-223017(0)'01887-227OOO@'9468177095
2nd callto Chief Engineer, Bhakra Dam 01 887-223001(O), o1 887-223024@' 7888697174
3,d cail to S E.(Hq) Nangat o1al7-223164(0), 01887-223237(R),9417021604
4thcalltoXENBhakraMechanicalolBST-223117(o),9417202040
5th call to XEN RM &SR 01887-223092(0)' 9463998256(M)
6th call to XEN Nangal Dam, 01887-220563(0)' 7589303892
7th call to XEN Bhakra Electrical 01887-223094(0), 9463998419(M)
SthcalltoDirectorDesign,NangalolBST.223los(o),9417202097
9th cail to Director, Dam safety 01887-223179(O), 01887-2230-89@' 9463998230
lOthcalltoSDE,WaterRegulationolSST-223043(0),9694096244
S.E. (BDC) will make three number calls as below
l.tcallto Chief Engineer, Bhakra Dam 01 887-223001(o), 01 887-223024@' 7888697174
2nd Callto contact experts (Annexure XVlll)
3'd call to S.E. Bhakra Power Houses 01887-223261(O)'
ChiefEngineer,BhakraDamwillmakefivenumbercallsasbelow
1't call to Member. lrrigation 0172-5011752-53
2nd callto Chairman, BBMB 072-5011750-51
3th call to C.E. Generation 01887'223355(0)
RevCIwed and APProved BY
esign
I
10
By
fi
Prepared
ASE-I
Doc. No.BHD/DESIGN/EAP-Dile:12-07-2019Issue No. 02Page.2l of88Page Revision No. 0
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
TITLE: EMERGENCY ACTION PLANFORHANDLING SITUATION ARISING OUT OF
HYDRSLOGICAL FAILURES, EARTHQUAIGS ORorHERS. COntrOlled
BHAKRA BEASMANAGE,MENT
BOARD
11
Annexure-V
4th call to C.E. BSL Project, Sundernagar 0'1907-262333(0),
5th call to C.E. Pong Dam, Talwara 0'1883-237131(O)
S.E.(Hq.) will make a phone call to Sectt. BBMB, i.e. Chairman and Member (l)C h a nd i g a rh 0 17 2-254857 2(O)XEN Bhakra Mechanical will make a single call to S.E. (NMC) 01887-223004(0),
941720276
XEN RM & SR will make a single call to SE (BDC) 01887-223017(O), 01887-227000@,
94681 77095
XEN Nangal Dam will make a single call to S.E. (BDC) 01887-223017(0),01887-
227000@, 9468177095
XEN Bhakra Electrical will make a single call to S.E, (NMC) 01887-223004(0),
e417202076(M)
SDE Water Regulation will make two number calls as below
1't call to Director, Water Regulation 01887-223758(0), 9463598550,
2nd call to XEN Nangal Dam 01887-220563(0), 7589303892
Director Water Regulation will make two calls as below
1st call to Member, lrrigation 0172-5011752-53
2nd call to IMD New Delhi 011-27662607
S.E.(NMC) will make two number calls as below
1't call to SE, Talwara Circle for Machinery 01883-236013(O), 01883-236114@
2nd call to S.E. Circle-ll, BSL, Project, Sundernagar for Machinery 01907-262354(0),
01907-262398@
12.
13
14.
15
16
17
1B
Reviewed and Approved By
Direqtor Pesigno/^A
\
YPrepared By
BHAKRA NANGAL PROJECTINTEGRATEDMA@
?'.]::.ild
BHAKRA BEASMANAGEMENT
BOARD
TITLB EMERGENCY ACTION PLANFOR, .HANDLING SITUATION ARISING OUT OF
HYDROLOGICAL FAILURES, EARTHQUAKES OR
orHERS" cootrolled
Doc. No.BHD/DESIGN/EAP-Datezl2-D7-2019Issue No. 02
Page.22 of88Page Revision No. 0
Annexure-V(l-V)
External Alert Orange
Narrative information listing of persons to be notified by each individual as per NFC
1. After knowing about the occurrence of a disaster JE will make single call to sDo lnstrument & sDo
Instrumentation will make ten number calls as below
l,tcallto XEN Bhakra Dam Division 01887-223075(0), 9463998256
2ndcalltoSDOHydrology,7973205990'9463718386
3,dcalltoSDoReservoirManagementgSS2l03l03(M)
4th call to SDE Dam Safety 01887-223140(O)
5thcalltoSDoRoadandColony01887.223118,7589322346
6th call to sDo Permanent installation 01887 -2232 1 9(O), 9465225304(M)
TthcalltoSDodischargeolsST-223173(o),9463998185(M)
Sthca|ltoChiefFireofficerNangalolssT-223101(o)
9th call to photographer to cover the event at site 9417589142(M)
1oth call to sDo Bhakra Electrical. 01887-2231 18(O), 9417773829(M)
2.sDoHydrologywillmaketwonumbercallsifhegetstheinformationaboutdisasterfirst1't call to XEN Hydrology 01887-223083(0)' 7589303748
2nd call to sDo lnstrumentation 01 887-224537@, 9463595152' 7589303795
3. SDO R/M will make two number calls as below
l.tcalltoXENRM&SR01887-223092(0),9463998256(M)
2nd cail to Supdt. procurement Nangal 01887-223011(o), 01887-227400@' 9463998419
Reviewed and APProved BY
oi'"9{'ion^tt,fi
ilf****iW ffi..:P.TYT
BHAKRA BEASMANAGEMENT
BOARD
4.
Annexure-V
SDE, Dam Safety will make four number calls as below
1't call to Director, Dam Safety 01887-223179 (O), 01887-223089@, 9463998230
2nd call to XEN Township 01887-223040(0), 9417333940, 9530903085
3'd call to Police Station Nangal 01887-223100
4th call to: He will ensure that messages have been delivered to each individual as per NFC
SDO Road and Colony will make two number calls as below
l.tcall to village Pradhans d/s Bhakra Dam & NGO's to get ready the persons for evacuation
immediately2nd Call to Check Post Barmala 01887-223192
SDO Discharge will make a single call to SDE.Water Regulation 01887-223043(0), iAAAOg6TqnXEN Hydrology to remain in constant touch with IMD/CWC & catchment area u/s IMD 011-
27 662607,M-O9A r 8553839, CWC 01 1 -26108855-0/0 1 1 -26913645- R
XEN RM & SR will make three number calls as below
l.tcallto S.E. Bhakra Dam Circle, Nangal 01887-223017(O), 01887-227000@, 9468177095
2nd call to civil authorities Una 01975-225800
3'd call to SP Una 01975-223216,225056
Xen Bhakra Mech, will make a phone call to S.E.NMC, 01887-223004(0), 01887-227062@,
9417202076
XEN Bhakra Dam will make ten number calls as below
1't call to S E BDC 01887'223017(0), 01887-227000@, 9468177095
2nd call to Chief Engineer, Bhakra Dam O1 887-223001(O), 01 887-223024@ 7888697174
3'd call to S. E. (Hq) Nangal 01 887 -2231 64(0), 0'1 887 -223237 @, 941702 1 604(M)
4th cail to XEN Bhakra Mechanical01887-2231 17(O), 9417202040
5th call to XEN RM &SR 018870223092(0), 9463998256(M)
b.7
L
'10.
Doc. No.BHD/DESIGN/EAP-Dile:12-07-2019Issue No. 02Page.23 of88Page Revision No. 0
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
TITLE: EMERGEI{CY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL
FAILURES, EARTHQUAK&STOR OTIIERS'Lontrolled
Prepared By Reviewed and Approved BY
)*lDirector Qesign
Doc. No.BIID/DESIGN/EAP.Dztezl}-}7-2019Issue No. 02
Page. 24 of 88
Page Revision No. 0
BHAKRA NANGAL PROJECT
INTEGRATED@
BHAKRA BEASMANAGEMENT
BOARD
Ti@cTIoNPLANFoRTT,q.NULIXG SITUATION ARISING OUT OF
HYDROLOGICAL FAILURES, EARTHQUAKES OR
Contro
Annexure-V
11.
12.
6thcalltoXENNangalDam018B7-22o563(o),75B9303B
TthcalltoSDE,WaterRegulationolBBT-223043(0),9694096244
Bth cail to Director Design, Nangal o1BB7-223108,9417202097(M)
9th cail to Director, Dam Safety 01887-223179 (O) O|BB7-223089@ 9463998230
1.th cail to XEN Bhakra Electrical oiBBT-223094(0)' 9463998419(M)
.r1th cail to p.s.o in case of sabotag e -o1BB7-223060(0) 223104@
S.E. (BDC) will make three number calls as below
1't call to chief Engineer, Bhakra Dam 01 887-223001(O)' 01 887'223024@ 7888697174
2nd call to Experts as per list at Annexure-XVlll
3d calr to s.E. Bhakra power Houses o1BB7-223261(o) 223252@
ChiefEngineer,BhakraDamwillmakeSevennumbercallsasbelow'l't call to Member' lrrigation 0172-50752-53
2nd call to Chairman, BBMB 0172-5011750' 5011751
3d call to Distt. Magistrate & Chairman Co-ordination Relief Committee' Ropar
4th call to C.E' System Operation' Chd'0172-2653660
5thcalltoC'E'Generation'Chd'01887-223355(0)
6thcalltoC,E.BSLProject,Sun-dernagarolgoT-262333(0)'
7th call to C.E. Pong Dam' Talwara 01883-237131(O)
Bth call to C'E' Ranjit Sagar Dam 0172-2549176
13. S.E.(Hq) Nangal will make thirteen number calls as below
1't call to Secretary, BBMB' 0172-5011759(0)
Reviewed and APProved BY
Directhr.D#ign
Prepared BY
Doc. No.BHDIDESIGNIEAP-Date:12-07-2019Issue No. 02Page.25 of 88Page Revision No. 0
BHAKRA NANGAL PROJECTINTBGRATED MANAGEMEN'T SYSTEM
TITLE: EMERGENCY ACTION PLANFORHAI{DLING SITUATION ARISING OUT OF
HYDROLOGICAL FAILURES, EARTHQUAKESoR orHER.. L'ftfOlle0
BHAKRA BE,ASMANAGEMENT
BOARD
2nd call to Civil Hospital Anandpur Sahib 01887-232193
3'd call to Civil Hospital Ropar 0188'1 -1221141
4th call to keep constant liaison with civil authorities, Ropar.
5th call to SSP Traffic Ropar 01881 -220119
6th call to News Media as per list at Annexure-X
7th call to SSP Ropar 01881-220119
8th callto DSP Ropar 01881 -22}1gg
9th call to DSP Anandpur Sahib 1887-232068
'1Oth call to DFO Ropar 0'188'1-222231
1 1th call to SDM Anandpur Sahib 01887-232036
12th callto NFL Hospital Naya Nang al01887-220622
13th call to Fire Tender NFL, Naya Nangal 01887-220648
14 Secretary BBMB will make four number calls as below
1 .t cal I to sect. Rajasthan I rrig ation 01 41 -2227 7 17 (O), 01 41 -257 4455@
2nd call to Sect. Haryana lrrigation 0172-2713496 (O), 0172-2706285@
3,d cat I to Sect. Pu njab I rri g ati on 0 17 2-27 43442(0), 017 2-27 27 049 R)
4th call to Deputy Commissioner (lndus) MoWR Delhi 011-24100787'(R)
15. Member lrrigation will make two number calls
1't call to Chairman, BBMB, 0172-5011750-51
2nd call to Chairman, CWCO1 1-26108855(0) 01 1-26913645@
'16. SDE, Water Regulation will make two calls as below
1.t call to Director, Water Regulation 01887-223758(0), 223143@,9463598550
2nd call to XEN Nangal Dam 01887-220563 (O)' 7589303892
17 XEN Township will make five number calls as below
1't callto Mobile Van announcements d/s Bhakra and in Nangal area
2nd call to Pl\lO Canal Hospital, Nangal 01887-223012 (O)
3d call to Punjab Pollution Control Board Member Secretary, Patiala 0175-2215802
Annexure-V
Reviewed and Approved BY
BIIAKRA NANGAL PROJECT
INTEGRATEDMA@
BHAKRA sBa$u itMANAGEMENT BOARD
ffiYACTIONPLANFORTUNOT,TNG SITUATION ARISING OUT OF
nor.-otrc^r."Jrrg*r*tr"T$ffi
19.
20
Doc. No.BIID/DESIGN/EAP-Date:12-07-2019Issue No. 02
Page. 26 of 88
Revision No. 0
Annexure-V
4thcalltoMunicipalCommitteeNangalolssT-220589,220586
5thcalltoAnnouncementfromGurdwaras&MandirM.9417143501(GurudwaraGhatSahib)
ls.Director,WaterRegulationwillmaketwonumbercallsasbelow1't call to Member, lrrigation 0172-5011752-53
2nd callto IMD New DelhiO11-27662607
3,dcalltoDirector/PowerRegulationChandigarh0172-2652820,
4th callto C.E System Operation' Chandigarh 0172-2653660
5th call to IMD Shimla 0177-2624976'26224396
XENBhakraElectricalwillmakeasinglecalltos'E'NMC'01887-223004(0)'9417202076
Chairman BBMB will make two number calls as below
1.t call to Mop Govt. of tndia 011-23717474, 23710411, 23719205(0) 011-23092372'
23098852@
2nd callto lndian ArmY
(i) Station Commander Chandi Mandir 0172.2868761.Extn 6240, Exln.6242 Civil No.0172-
2589564,
(ii) Chandimandir Help line 0172-2589624
21 S.D.O. Permanent lnstallation will make single callto XEN Bhakra Mechanical 01887 -2231 17(O)'
9417202040
22 S.E.NMC Nangalwill make three No' calls as below
l.tcallto s.E. Talwara operation for machinery 01883-2360',13 (o) 236114 @
2ndcalltoSEBSLCircle-lsunderNagarformachinery0lgoT_262400(o),262442@
3,d call to sE BSL Circle-ll Sunder Nagar for machinery 01907-262354 (o)
23PSowillmakethreeNo.callsincaseofterroristattackasbelow'1't ca I I D i recto r/ S ecu rity 017 2-50 1 17 62-63 (o)' 22242569@
2nd call to all concerned as per Annexure-Vll
3d cail to c.E Bhakra Dam, 01 BB7-z23oo1 (o),223024 @, 7888697174
eweO anO APProved BYPrepared BY
BHAKRA BEASMANAGEMENT BOARD
BHAKRA NANGAL PROJECTINTEGRATED MANAGBMENT SYSTEM
Doc. No.BHD/DIISIGN/EAP-Date:12-07-2019Issue No. 02Page. 27 of 88Pase Revision No. 0
TITLE: EMERGENCY ACTION PLANFORHANDLING SITUATION ARISING OUT OF
HYDROLOGICAL FAILURES, EARTHQUAKES OROTHERS.
Annexure-V(l-V)
External Alert RED
Narrative information of persons to be notified by each individual as per NFC
1. After knowing about the occurrence of disaster JE will make single call to SDO lnstrument & SDO
lnstrument will make ten number calls as below
lstcallto XEN Bhakra Dam Division,01887-223075(0), 9463998256 (M)
2nd callto SDO Hydrology 01887-223241 @,7973205990
3'd call to SDO Reservoir Management 9882103103 (M)
4thcall to SDE Dam Safety 01887-223140 (O), 9463598397
Sth callto SDO Road and Colony 01887-223118(o),224338 @, 7589322346
6th callto SDO Permanent Installation 01887-223219(O), 224350@,9465225304 (M)
7th callto SDO discharge 01887223173(0), 9463998185 (M)
8th call to Chief Fire Officer Nangal 01887-223101 (O)
9th call to photographer to cover the event at site 9417589142
1Oth call to SDO Bhakra Electrical 01887-223118 (O), 9417773829 (M)
2. SDO Hydrology will make two number calls if he gets the information about disaster first
1't callto XEN Hydrology 01887-223083 (O), 01887-223089 @, 9463998230
2nd call to SDO,JE lnstrumentation 01887-224537 @, 223045(0), 9463595152, 7589303795
3 SDO R/M will make four number calls as below
1'l callto XEN R/M 01 887-223092 (O), 7589303748
2nd call to all village Pardhan u/s Bhakra Dam & NGO's of the area as perAnnexure-Vlll
3,d call to Superintendent Procurement 01887-22301 1 (O), 01887-227400 @ 9463998419
4th callto SDO Pollution Control Board, Bilaspur 01978-223550
4. SDE Dam Safety will make four number calls as below
'l.tcallto Director, Dam Safety01887-223179 (O), 01887-223089 @, 9463998230
2nd call to XEN Township 01887-223040 (O), 9417333940, 9530903085
3'd call to Police Station Nangal 01887-223100
4th callto. He will ensure that messages have been delivered to each individual as per NFC
5. SDO Road and Colony will make two number calls as below
RevEWed and Approrcd By
BHAKRA NANGAL PROJECTINTEGRATEDMA@
irf i 'li s
BHAKRA BEASMANAGEMENT
BOARD
TITLL EMERGENCY ACTION PLANFOR
HANDLING SITUATION ARISING OUT OF
HyDRo Lo crc AL "HHH"},T;ff;;,tH ""
6.
7.
Doc. No.BHDiDESIGN/E,AP-Date:12-07-2019Issue No. 02
Page. 28 of 88
Page Revision No. 0
Annexure-V
1.tca[ to viilage pradhan d/s Bhakra Dam & NGOs to evacuate the persons rmmediately (Annexure lX)
2nd Callto Check Post Barmala01887-223192
sDo Discharge wi, make a singre phone cail to sDE, water Regulation 01887-223043(0) 9694096244 M)
XENHydrologywillmakeacalltoFisheryDeptt,Bilaspur'01978-224068(0),01978-223390@.Hewillalso
remaintnconstanttouchwithCWC&withlMDandwithcatchmentarea.
XEN RM & SR will make seven number calls as below
l"tcallto s.E. Bhakra Dam circle, Nangal 01887-223017 (O), 01887-227000@' 9468177095(M)
2nd call to Civil authorities Bilaspur 01978-224155
3'd call to SP Bilaspur 01978-224500
4th call to Civil authorities Una 01975- 225800
Sth callto SP Una 01975-223216,225056
6th callto Civil Hospital Bilaspur 01978-222580
7th callto DFO, Bilaspur 01978-224809
Xen Bhakra Mech, wi, make a phone calt to s.E.NMC, o1BB7-223004(0)' 01887-227062@'
e417202076(M)
XEN Bhakra Dam will make ten number calls as below
1'tcalltos.E.BDC0lBBT-223017(0),01887-227oOO@,9468177095(M)
2nd callto chief Engineer, Bhakra Dam 01887-223001(O), 01887-223024@'7888697174
3,d can to s. E. (Hq) Nangat 01 BB7 -223104(0), o 1 BB7 -223237@, 94 1 702 1 604(M)
4lhcalltoXENBhakraMechanicalolBBT.223llT(o)'9417202040(M)
SlhcaIItoXENRM&SRo1BB7-223092(o),9463998256(M)
6th cailto XEN Nangal Dam 01887-220563(O),7589303892(M)
TthcalltosDE,WaterRegulationolBBT-223043(0),9694096244M)
8th callto Director Design, Nangal 01887-223108 (o), 9417202097(M)
9th callto Director, Dam Safety 01887-223179(0) 01887-223089@, 9463998230(M)
1Orh callto XEN Bhakra Electrical 01887-223094(0), O|BB7-227400@' 9463998419(M)
9.
10.
Reviewed and APProved BY
oirect*flsn
BI{AKRA NANGAL PROJBCTTNTEGRATBD MANAGEMENT SYSTEM
Doc. No.BHD/DESIGN/EAP-Datezl2-07-2019Issue No. 02Page. 29 of 88Page Revision No. 0
TITLE: EMERGENCY ACTION PLANFORHANDLING SITUATION ARISING OUT OF
HYDROI,OGICAL {AILURES, EARTHQUAKES ORorHERS. Coutnoffed
BHAKRA BEASMANAGEMENT
BOARD
Annexure-V
11.
'11lh call to PSO in case of sabotage 01887-223060(0), 01887- 223104@
Chief Engineer, Bhakra Dam will make six number calls as below
1sl call to Member. lrrigation 0172-5011752-53
2nd call to Chairman, BBMB 0172-5011750-51
3'd call to Distt. Magistrate & Chairman Co-ordination Relief Committee, Ropar
4th callto C.E System operation, Chd.0172-2653660
Sth call to C.E. Generation 01887-223355(0), 01887-223146 @
6th call to C.E. BSL Project, Sundernagar,01907-262333(0), 01907-262444@
7th callto General Manager, Kol Dam Project, 01978-245061
S E. (BDC) will make three number calls as below
1't callto Chief Engineer, Bhakra Dam 01887-223001(O),01887-223024@,7888697174
2nd call to Experts as per list at Annexure-XVlll
3'd call to S.E. Bhakra Power Houses 01887-223261(0)
S.E. (Hq) Nangalwill make Fourteen number calls as below
1't callto Secretary, BBMB, 0172-2548572 (O)
2nd call to Civil Hospital Anandpur Sahib 01887-232193
3'd callto Civil Hospital Ropar 01881-221141
4th call to keep constant liaison with civil authorities5th call to all concerned D.Cs of Punjab State as per Annexure-Vll6th call to SSP Traffic Ropar 01881 -220119.
7th call to News Media as per list at Annexure-X
Bth callto SSP Ropar 01881-220119
9th callto DSP Ropar 01881-220199
1Oth call to DSP Anandpur Sahib 01 887-232068
11th call to DFO Ropar 01881-222231
12th call to SDM Anandpur Sahib 01 BB7-232036 , '
13th call to NFL Hospital Naya Nangal01887-220622
14th callto Fire Tender NFL 01887-220648
Secretary BBMB will make four number calls as below
12
IJ
14.
I
Reviewed and Approved By
olrCr *sisn\
nHr\fn q. NANGAL PROJECTINTEGRATEDMAN@
BHAKRA BEASMANAGEMENT BOARD
TITLE, EMERGENCY ACTION PLANFOR
HANDLING SITUATION ARISING OUT OF
IIYDROLO GICAL FAILURE S, EARqIQI]
Doc. No.BHD/DESIGNiEAP-Datezl}-D7-2019Issue No. 02
Page.30 of88Revision No. 0
Annexure-V
,1 st call to Sectt. Rajasth an l rrigation o1 4 1 -2227 7 17 (o) 0 1 41 -257 4455@
2nd cat I to Sectt. p u njab I rrigation O 17 2-27 43442, 27 45603(0) 0 1 7 2-27 27 049@
3'dcalltoSectt.Haryanalrrlgation,olT2-2713496(0)0172-2706285@
4th call to Deputy commissioner (lndus) MoWR Delhi 01 1-24100787-(R)
15. Member lrrigation will make two number calls
1't callto Chairman, BBMB, 0172-5011750-51
2nd cal| to Chairman, CWC 011-26108855(0) 011-26913645@
16. SDE, Water Regulation will make two calls as below
lstcalltoDirector,WaterRegulationolBBT-223758(o)'9463598550
2ndcalltoXENNangalDam0lSBT-220563(o)7589303892
17. XEN Township will make five number calls as below
l.tcalltoMobileVanannouncementsd/sBhakraandinNangalarea
2nd callto PMo Canal Hospital, Nangal 01887-223012 (o) 01887-22333,1@
3d call to punjab pollution Control Board Member Secretary, Patiala 0175-2215802
4th callto Municipal committee Nangal 01887-220589, 220586
5lhcalltoAnnouncementfromGurdwaras&MandirM.g41714350,1(GurudwaraGhatSahib)
18. Director, Water Regulation will make two number calls as below
1't call to Member' lrrigation 0172-50117 52-53
2nd callto IMD New Delhi 011-27662607
3'd call to Director/ Power Regulation chandigarh 0172-2652820
4thcalltoC'Esystemoperation,Chandigarh0lT2-2653660
5th callto IMD Shimla 0177-2624976'26224396
lg.XENBhakraElectricalwillmakeasing|ecalltoS.E.NMC,o18B7-223004(0|,9417202076
20 Chairman BBMB will make two number calls as below
l.tcallto MoP Govt. of lndia 0,1 1-23717474,23710411,2371g205(o)011-23092372, 23098852@
2nd call to lndian ArmY
(i) station cornmander chandima ndir 0172-2808761-Extn 6240, Exln'6242 civil No'0172-2589564'
(ii) Chandimandir Help line 0172-2589624
21 S,D.o. Permanent lnsta|lation will make single ca|l to XEN Bhakra Mechanical 01887.223117(o)
9417202040
S.E.NMC Nangalwill make three No' calls as below
Prepared BY .-.{ss9pd BY
tbHeRr-Reviewed and APProved BY
ASE-I
BHAKRA BEAS
BHAKRANANMIryJE GRATED MAI{A GEMENT SYiTEM
Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02Page.31 of 88Page Revision No. 0
TITLE: "*rO"SITUATION ARISIIVG OUT OF HYUNOIOGICAL
FAILURES, BARTEIQUAKES t%'rTF8ftta
23
Annexure-V
1stca, to s.E. Tarwara operation for machinery 01883-236013 (o) 236114 @2nd call to sE BSL circle-1 Sunder Nagar for machinery 01 907-262400(o),262442 @3'd call to sE BSL circre-il sunder Nagar for machinery 01 go7_26x5a
@)PSo will make three No. cails in case of terrorist attack as berow1't call Director/ security o1z2-so1 1162-63 (o), 22242s6@2nd call to all concerned as per Annexure_Vll3'd call to c.E Bhakra Dam, oIBBZ-223001 (o), 223024@, 94 122160s1
Reviewed anO RpproveO Ay
Doc. No.BIIDIDESIGN/EAP-Date:12-07 -2019
Issue No.02Page. 32 of 88
Page Revision No.0
BHAKRA NANGAL PROJECTINTEGRATED@{l-
t',,Fex=\-s{_*y-.-,;,?,.,i:,.:..
BHAKRA BEASMANAGEMENT
BOARD
@AcrroNPLANFoRfra.Nol,wc srruATroN ARISTNG our oF
TIYDROLOGICAL FAILURES, EARTHQUAKES OR
oTIIERS' controlled
1.
2.
3.
4.
Annexure-Vl
SampleWarningMessagesfordifferentsituations
Blue situation of Emergency (lnternalAlert)
i) Land slide, occurred in Timber Rope-way area endangering trolley operation
ii)SmallleakageobservedfromthesealoftheradialGateNo.----RULeftside
Yellow Situation of Emergency (lnternal Alert)
i) Leakage observed from 18', dia penstock fill pipe in gallery---- El'-----
ii)StressmetersinBlock20El--.showingincreasedstressesPlumb line in Block 20 showing higher deflection
Orange Situation of Emergency (External Alert)
i) Widening of crack in foundation gallery st'--- ch
ii) Heavy land slide occurred in Left abutment u/s
Red Situation of emergency (External Alert)
i) High inflow of t 150,000 cs are coming (More floods expected as Per IMD) over
toPing imminent
ii)SpillwayradialgateNo.----gotstuckandinoperativeandRWLrising
.--- HeavY leakage observed
near check Post
Rev'lewed and APProved BY
Directer!eq0n
Prepared
ASE-I
By
fi
II INTEGRATED MANAGEMENT SYSTEMI ''***;#,' J TITLE: EMERGENCY ACTION PLANFOR HAN
] "*
] srru,r-i'roN lnrsrNc our oF HyDRoLoGrcAL FATLURES, I
IJIIAsnn ocn: I EARTHeUAKES OR OTHERS. rrr.rr,rcnivrnxr soano ,
- Cb[trglletl ,'
Lrsi or orpurv coMMrssroNERS oF puNJAB & HTMAcHAL pRADEST{ DrsrnrcrS
TITLE: EMERGENCY ACTION PLANFOR HANDLINGSI'TUATION ARISING OUT OF HYDROLOGICAL FAILURES,
EARTHQUAKESOROTHERS. !Contrelleo
BHD/DESIGN/EAP-Dfie:12-07-2019Issue No. 02Page. 33 of88Page Revision No. 0
Annexure-Vll(i)
Sr.
No.
Office Address Name of Officers Telephone numbers
Office Residence
D.C.Ropar Sh. Sumeet Jarangal 01881-221150 950'1 946999 , 01881-221250
2 D.C.Nawanshahar Sh. Vinay Bublani01823-221301
98 1 4700098 , 01823-221301
J D.C. JalandharSh. Varinder Kumar
Sharma0181-2224783 855601 '165'l , 0181-2459664
4
E
6-
D.C.LudhianaSh. Pardeep Kumar
Aggarwal
016'1-24031009463837820 , 0161 -2404055
D.C.Patiala Sh. Kumar Anil 0175-2311300987 27 6357 7, 017 5-231 1 302-
303
D.C Ferozpur Sh. Chander Gaind 01632-244008 981421 1 333, 0 1 632 -244006
i- D.C.Kapurthala Sh. D.P.S Kharbanda 01822-233777 98 1 530 421 3, 0 1 822-2337 7 6
1
2
Punjab Police Admin
SSP Ropar Sh. Swapan Sharma01881-221273,
01881-2201209779911 1 1 0, 01 881-2201 19
SP Head quarter Sh. Jagjit Singh 01881-220119 9878950009
t--4-5*-
DSP APS Sh. Chand Singh 01887-232068 977 9042006, 9877 47 91 00
DSP Nangal Sh. G.P Singh 01887 -227 100 98 1 5509024
SHO Nangal Sh Sumit Morh 01887-223100 85881 09009
Himac hal Pradesh Admin
i-_- DC Una Sh. Rakesh Kumar 01975-225800 70 1 8999701, 0197 5-225900
i- DC Bilaspur Sh. Vivek Bhatia 01978-224155 B9BB280'1 16. 01 97 8-2241 50
3 SP una - Sh Diwakar Sharma 01975-225056 701 8995900
4 SP Bilaspur Sh. Arif H. Sheikh 01978-224500 0197 8-224180, 765095040 1
5
6-DSP Naina Devi sh. Sanjay Sharma 01 978-288080 9816904428
SHO PS Una Sh. Sarabjeet Singh 01975-226028 981 6486909
7 SHO PS BanganaSh. Parkash Chand
Sharma01975-262043 9418167351
8 SHO PS Kot Kahloor 01 978-288031
lndian Army
Station Commander Chandimandir 0172-2868761, Ext.6240 Ext.6242
Civil No 0'172-2589564
-t
Lj
'lL
It-I
I
l
t_ -_1_
Reviewed and Approved By
Doc. No.BHD/DESIGN/EAP-Date:12-01-2019Issue No' 02
Page. 34 of 88
e Revision No. 0
BHhKRA NANGAL PROJECT
INTEGRATED@
BHAKRA BEASMANAGEMENT BOARD
Tm[n entnncENcY ACTIoN PLANFoRHANDLING SITUATION ARISING OUT OF
HYDROLOGICAL FAILURES, EARTHQUASTSf R
Llsr of contact numbers for sniffer Dog/Bomb Disposal squad/Firefighting Tenders Annexure-Vll(ii)
Dog Squad
1
,
Office Address Name Telephone numbers Residence
9779580903
0172-276000S.S.P. ChandigarhMrs. Nilambari
Jagadale0172-2760001
9779926162D.S.P Line Chandigarh Sh. DaleeP Ratan 01 /'2-Z(VA6t o
0181-222012678370991 00,
9814187924
4
S.S.P Jalandhar Sh. Navjot Singh
9815772609Sl Dhani Ram 0161:[240Uv
D(Jlrlu 5q
1
2
P.C.R RooPnagar9779513708
81 46999598D.G.P Arm Battalion' Jalandhar
lnsp. Harjinder Singh
Sh. Ravinder Singh 0181-2456272
EAMAI\987881 5699
1 'C Balbir Singh
01823-226524 94 1 73795682
3
SBS Nagar I HC: Jaspal Singh94 1 73831 03
9463705280HoshiarPurHC: Satnam Singh
HC: Dilbag Singh01882-2475068
01B1-2240609 L_:',*:',',y:4 Jalandhar II
Fire Fighting Tendt
I1
,51
ABMB Fire Station Olinda
BBMB fire Station Nangal u16d l -z/c tv
llFl- F-iailon NaYa Nangal u'l|60 l'zLva+o
941 8903501Fire Station Una Sh. Nitin Dhiman o19 l5-ZZO tv t
01978-222227 70188214695
6
7
I
Fire Station BilasPurFO. Subasn unanoer
Mishra981 5979045
991 5988000nssistant Divn. Fire Officer
M.C. HoshiarPur
FO. Sadiq Masih
SFO. Surinder Singh01882-222222
9418021617,
941 8903501Commandant Home Guard
Una 12 Battalion
ROrn Otticer Dheeraj
Sharma01975-223345
SGSST Ghanoliu'!66 l-lzt t)r
Prepared BY
ASE-I
BHAI(RA BEASMANAGEMENT
BOARD
f)oc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02Page. 35 of88Page Revision No. 0
BIIAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
TITLE: EMERGENCY ACTION PLANFORHANDLING SITUATION ARISING OUT OF
HYDROLOGICAL FAILURES, EARTHQUAKESoR orrIERS'
ComtrolEed
Annexure-Vlll
Name of Panchayats of Tehsil Sri Naina Devi, Distt. Bilaspur (H.P.)
Prepared By
Sr.No
Name ofvillage
Pardhan TelephoneNo/Mobile
Approximate K.M.from Damsite
Population side
1 Bhakra Parbhat Singh 0941 81 45409 2 750 Left
2 Khulmi Parbhat Singh -do- 4 324 Left
3 Makari Narinder Kumar 09418445304 6 575 Left
4 Khal Sudesh Kumari 09418295634 B 470 Left
5 Saloa Sudesh Kumari -do- 10 480 Left
6 Saran Sudesh Kumari -do- 10 200 Left
7 Dharda Sudesh Kumari -do- 12 100 Left
B Kamand
Aala
Sudesh Kumari -do- 14 80 Left
I Kanfara Shakuntla Devi 09459930692 14 100 Left
10 Kharkarhi Shakuntla Devi -do- 16 100 Left
11 Bhated Shakuntla Devi -do- 16 250 Left
12 chilt Shakuntla Devi -do- 17 100 Left
13 Maleta Shakuntla Devi -do- 18 100 Left
Reviewed and Approved By
BHAKRA BEASMANAGEMENT
BOARD
BHAKRA NANGAL PROJECT
INTEGRATED MANAGEMENT SYSTEM
Name of Panchayats of Tehsil Bangana Distt. Una (H.P)
Doc. No.BHD/DESIGN/EAP-Datezl2-D7-2019Issue No. 02
Page. 36 of88Page Revision No. 0
Annexure-Vlll
TNiilEMERGENCY ACTION PLANFOR
IIANDLING SITUATION ARISING OUT OF
HYDROLOGICAL FAILURES, EARTHQUAKESoR oTHERS' CeftfOlleU
ApproximateK.M. fromDam site
Population SideSr.No
Name ofvillage
Pardhan TelephoneNo/Mobile
4 170 Right1 Paroian Pushpa
Devi
94594888e6
6 100 Right2 Kusiala -do- -do-
7 670 Right
R,ght
3 Dobar Ram Piari 96151 47 /U4
I 5704 'lRaiPur i -oo-
I Bador I
-do-
10 100 Right5
6
Androli -do- -do-817 Right
R'ght
I Riotrtl--I Risht
Kolka Raghbir
Singh
0980589'1367 1'2
14 5707 Dohak Mohinder
Pal
098U534U2-l /
-do- '15 500B Bihru -do-
15 400I Badhgar -do- -do-
19 300 Risht10 Mandli -do- -do-
nevieweO and APProved BY
oirectglp{on
lssue{By
'[}LIhry t*
BHAKRA BEASNAGEME,NT BOARD
Doc. No.BHD/DESIGN/LAP-Date:L2-07-2019Issue No. 02
Page. 37 of88Pase Revision No. 0
BIIAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
TITLE: EMERGENCY ACTION PLANFOR
. HANDLING SITUATION ARISING OUT OF
HYIiflOLOGICAL FAILURES, EARTHQUAKES OR
s
N
I
Annexure-lX
LIST OF VILLAGES FALLS ON D/S OF BHAKRA DAM AND NAME OF NGO'S /
SARPUNCH AND THEIR CONTACT NUMBERAS
r.
o.
Name of village Name of Gram
Panchayat/Pardhan
Telephone No. Approx.
Pupulation
Remarks
Kangra welfare
Sociqty
Sohan lal 931 64951 01 NGO
Sanatan Dharam
Sabha
Ramesh Gulati 981 5750760 NGO
Jinda Jeev
Besahara Ashram
Ashok Sachdeva 98761 65358 NGO
Salangri Sh.Kewal Singh 01 975-201 901 294
Neilla/Olinda/
Golethai
Smt.lndira 9478870615 1370
Talwara Sh. Amrik Singh 8146857692 3000
Changar Handola Sh.Ranbir Singh 987621601 3 1100
Bangarh (Fatewal) Sh.Ravi 9816437233 1280
Swamipur Sh.Rajinder Paul 9216524313 904
10 Khera Bagh Kulwinder Kaur 8146599202 350
t_lZ
I
J
I
:l
t
'4i--l5L
I
r-i6It- ,
f
lBI
I
t0I
IrII
Reviewed and APProved BY
Dirqdlot-DCsign
---_ NUATNA NANGAL PROJECT
INTEGRATED MANAGEMENT SYSTEM
BHAKRA BEASMANAGEMENT BOARD
LANFOR HANDLING
SITUATION ARISING OUT OF HYDROLOGICALr.qlr,uRE S, B ARTH QUAKE S
"r\r$rllfltfe d
Doc. No.BHD/DESIGN/EAP-Dile12-07-2019Issue No. 02
Page.38 of88Pase Revision No. 0
ANNEXURE-X(i&ii)
Aiit (Pb. I'Iindi)
lndianExpress
The Tribune
RozanaSpokesman
Daily Jag Bani
LISTCONTAININGCONTACTNUMBERSoFMEDIAPERSONSName of PaPerMobile No.
Amar Ujjala
HindustanTimes
981 531 5344Mr. AjaY Verma,5 5 66 li,MHC,M.Maj ra, Chandi garh
98152019294635411Mr. Hitl"ttVictor, # 62l,Phase-11
981401 50002705215ffillarka"*"1jit Singh, 50 1 /1 6-C,
98r44115622680295ffiE*ltt Strgh, 1 156, Phase-5,
Danik Bhaskar98728801 342708845tvt. Up"ndra Sen GuPta, 3124,
Housing Board Dhanas Chd'981 5501653
Mrs Neel"m Sharma, 346-A, Sec'
5071701FAX 0172-2651.291
Sr. Associate Auditor
921,666260sMiK"fird.t Bh atia 522, Phase-6
9888726834trrtr. Vi"uy Kumar, 3308, sector
45D Chd.
Re./lewed and APPloved BY
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
Doc. No.BHD/DESIGN/EAP-Datezl2-O7-2019Issue No. 02Page. 39 of88Page Revision No. 0
TITLE: F{{F,RGENCY ACTION PLANFORHANDLING SITUATION ARISING OUT OF
HYDROLOGICAL FAILURBS, EARTHQUAKBSoR orHERS. COmtrOlf,ed
BHAKRA BEASMANAGEMENT
BOARD
DOORDARSHAN JALANDHAR (TV)
1. Director Doordarshan,T.V. CTIANNEL
Zee News
A.B.C. Network
ALL INDIA RADIO JALANDHAR
i. Director AIR
PRESS TRUST OF INDIA
1. Mr.Ashwani Kumar Anand
I-TNI
1. Mr,. V.K. Jallali
"":::l
Kk
AI{NEXURE-X
2254268(0),2205101@
0t61-441312
2t24t4,212797
2458177 (O),2452395@
98729-76281-M
98141-28468
95\72-2704299-O
95172-2707034-O
95172-2705814-FAX
II
i_
Reviewed and Approved By
oire^clpr Besignryl
-- BHAKRAFANGAL PROJECT
INTEGRATED@
BI{AKRA BEAS
MANAGE,MENT BOARD
FORIIANDLING
SITUATION ARISING OUT OF HYDROLOGICALM.u,unrs,EARrHQUAKEs?\""rfr1',otfed
Doc. No.BHD/DESIGN/EAP-D*ezl2-07-2019Issue No. 02
Page. 38 of 88
Revision No. 0
ANNEXURE-X(i&iD
Amar Ujjala
HindustanTimes
Ajit (Pb.I'{indi)
Eng,Tribune/PTI
lndianExpress
The Tribune
RozanaSpokesman
,Ipugd BY
lS#fuKr -
LIST CONTAINING CONTACT NUMBERS OF MEDIA PERSONS
Name of PaPerMobile No.
981 531 53442594903-6Mr. AjaY Verma,5 5 66 b,MHC,M'Maj ra, Chandi garh
98r52019294635411Mr Httl"ryVictor, # 621,Phase-1 1
98140150002705215Mr. ffik""*"l1,t Singh, 501/16-C'
Chandigarh98144rr562
dEa"ltt Sr"gh, 1 1 56, Phase-5,
Mohalli Danik Bhaskar98728801 34Vf. Up.nara Sen GuPta, 3124,
Housing Board Dhanas Chd'9815501653
N'I* N*1"* Sharma,346-4, Sec'
5071701FAX 0172-2651291
Sr. Associate Auditor
92t666260594632-89009Mrdlrttd.t B[aia 522, Phase-6
Daily Jag Bani9888726834Mt. VinuY Kumar, 3308, sector
4sD Chd.
nevieweO and APqroved BYPrepared BY
LANFOR HANDLING
SITUATION ARISING OUT OF HYDROLOGICALrarr,unrs, EARTHQUAKES OR OTHERS'
Cortrolled
f'IIAI\ISA I.\A1\UAL TI(\-,JI],\- I
INTEGRATED@
BHAKRA BEASMANAGEMENT
BOARD
FAGILITIESToMADEAVAILABLEINEACHcoNTRoLRooM
1. Emergency rescue lights (5 Nos')
2. Diving masks (2 Nos')
3. SafetY nets (5 mx5 m = 5 Nos')
4. Safety rope (1000 m long 25 mm dia)
5. RoPe Ladders (10 m long 5 Nos')
6. Full body harness (safety belts 10 Nos')
7. Ascending & Descending device (5 Nos')
B. Safety Helmets with head lamps (10 nos')
9. Ear muffsidust respirators/gumboots/safety shoes for 10 persons
l0.ElectricHandgloves/chemicalhandgloves'(5paireach)'
11. Fire extinguishers (5 Nos')
12. Mobile D.G.Set
13. Stretchers (5 Nos') First aid kits ('10 Nos')
14. Artificial Resuscitators (5 Nos')
15. Hand Light torches (5 Nos')
BIID/DESIGN/EAP-Dilezl2-07-2019Issue No. 02
Page.40 of88Page Revision No. 0
Annexure-Xl
lssued BY
.m8&ffi,RevreweOtnd APProved BY
oirectglp{sn
\
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
Doc. No.BHD/DESIGN/EAP.Date:12-07-2019Issue No. 02Page.4l of88Page Revision No. 0
TITLE: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL
FAILURES, EARTHQUAKES.QR OTH ERS.,,, ,,r,,. t ontrolledBHAI(RA BEASMANAGEMENT
BOARI)
Annexure-XII
t'
-i
iiF
rI
r r.' H iil ..."..,o**iJf
slu)l]:i<Jlst7l-l_.F
IglcflEI'_rlc0 I
cl(),
-ft- ''r-l
!D1{lJ
.L
{xC
,OgO-
Reviewed and Approved By
Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02
Page. 42 of 88
Page Revision No. 0
BHA.KRA NANGAL PROJECTINTEGRATEDMA@
RHAKRA BEASMANAGEMENT
BOARD
Tmr,E, rtvtEncnNcY ACTToN PLANFoRHANDLING SITUATION ARISING OUT OF
HYDROLOGICAL FAILURES, EARTHQUAKES OR
orHERS. Controlled
Annexure-Xlll
Name of Agencies lifting Water from Bhakra Reservolr
Name of Agencies Lifting Water from Nangal Pond
Name of AgencY
+91-1 978-244069(o)
Fax +91-1978-
244067
www acc limited
Com.
Manager-Finance
Gagal Cement WorksACC t-imited Gagal Cement
Works P.O.Barmana
Distt.BilasPur (HP)
01978-222579 (O)Executive EngineerExecutive Engineer
lrr.& Pub. Health Divn'
Bilaspur(H.P.)
Contact Number
zNlqapq17284563
Name of AgencY
SDO Water SuPPIY
9417012327@FL,NayaNangal9872526372
Bhabour Sahib
Bharmotti TemPle
Nanksar Gurudwara
Reviewed and APProved BY
BHAKRA NANGAL PROJECTTNTEGRATED MANAGEMENT SYSTEM
Doc. No.BHD/DESICN/EAP-Date:12-07-2019Issue No. 02Page. 43 of88Page Revision No. 0
. XIITLD: EMERGENCY ACTION PLANFORIIANDLING SITUATION ARISING OUT OF-
IIYDROLOGICAL FAI LURES. EARTHOI.I.AKES ORorHERS. eqi$f$lf&
BFIAKRA BEASMANAGEMENT
BOARD
I,IS'[ OF MOBILES NOS OF BHAKRA DAM ADMINISTRARTIONSr. No Name of officer Er. Designation Office Resi. Mobile No.
1 Er. Ashwani KumarAggarwal
Chief Engineer 01887-223001 0187-223024 7888697174
2 Er. Mohan Singh SE/HQ 01887-223164 01887 -223237 9417021604
aJ Er. Navpreet Singh ADE to CE/BD 01887-223164 9815288212
4 sh. Dharam Pal AccountOfficer/Budget
01887-223256 9463906189
5 Smt. Raksha Devi PS to ChiefEnsineer/BD
01887 -223001 973650s893
6 Sh. Gurbux Singh Section Officer/E,stablishment
01887-223168 7973607 163
7 Sh. Sandeep Jettley Supdt./Works 01887 -223164 8847420469
8 Sh. Kuldeep Singh PA to SE/HQ 01887 -223164 9878202101
Bhakra Dam Circle
Husan Lal Kamboj Dy. ChiefEngineer.
2230t7 227000 9417862698
BC & Township Division
Er. ManwinderSingh
XEN BCShip
8. TI 223040 223032 9530903085
2 Sukhdev Singh SDO/ WaterSuply
223148 9417284563
aJ Surinder Dhiman SDO/Enforcement 223040
4 Gulshan Sharma SDO/Estate 223040 9417478653
5 T.S. Mokha SDO/Const 223040 9814015203
Prepared By Reviewed and Approved By
^"(Dir srg n
lssued Bv
,fu?t*r u
EHAKRA NANGAL PROJECT
INTEGRATED MANAGEMENT SYSTEM
BHAKRA BEASMANAGEMENT
BOARD
ffiYACTIONPLANFORUANOITXG SITUATION ARISING OUT OF
IIYDROLOGICAL FAILURES, EARTHQUAKES OR
orHERs. Controlled
Doc. No.BHD/DESIGN/EAP-Date;72-07-2019Issue No. 02
Page. 44 of88Page Revision No.0
\
Bhakra Dam Division
223015 94639982561
,
V.K. Garg Addl.SE.Bh.DamDivn
7s89322346B.K. Saini SDO/Road &
Colony BhakraS/Divn
22'3 | t6
75893037e5SDO/Instt. 2230451J
4
Satnam Singh
SDO/SOS9781568643
SDO Horticulture5 Taiinder Stngh
9417021604
g4tT94ru
RM&SR
@I DIVN
DIVNl-- zz3o:s -I [-1
2;J
fTx-r.sGurdial Singh SDO/Silt SurveY
9882103 IUJSubodh Kumar SDO/RM Sub
Divn.941 I 160 t/.+
4 Pardeep SinghKataria
SDO/SPtttwaY
n^* Tti.,isi7589303892
XEN NangalDam Divn.
220563 2230641
,
Er. C.P Singh
895067 t 88u
9417861111Er. Yogesh SDO / Kotla 26535U
-SDO / NangalDam
220563aJ
4
Er. Harbilas
7589303't6lEr. Anil Mahajan SDO / Gate &
Gearing
22\)563
I Fi-nlal\angAl rYrEU
227062 9417202076I(.K. Sood S.E. NMC 223004
1 941618893 Iaor,lspnquc 223tJ04
2 Ashok Kumar
nevieweO and Approved BY
Directbr lPsign
Prepared BY
ASE-I
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYS'I'EM
Doc. No.BHDIDESIGN/EAP-Date:12-07-2019Issue No. 02Page. 45 of88Page Revision No. 0
TITLtr]: EMERGENCY ACTION PLANFOR".TJANDLTNG STTUATTON ARTSTNG OUT OF
HYDROLOGICAL FAILURES, EARTHQI]AKES QRoTH ERr. cOitrolle0
I]HAKRA BEASMANAGEMENT
BOARD
Bhakra Mechanical Division
I Avtar Singh Xen Ilh.Mech.f)n.
223117 9417202040
2 Ashok Kumar SDO/Transport 223129 94161 8893 I
aJ Rajbir Singh SDO / Railway
S/Dn.9417393452
4 Er. Mehar Singh SDO PermanentInstallation
9465225304
Nangal Vorkshop Division
I Er. R.K Singla Add.S.E.W/Shop 223015 227400 9463998419
2 Jitender Kumar SDO, Mech-1 9417 184057
-)
-4-
Gurwinder Singh SDO, Mech-II 9463990520
Er. Sukhchain Singh SDO, StructureShop
98725-3 0085
-tEr. Anil KumarBaiai
SDO, TP&l SubDivision
9417789247
6 Er. Vikas Garg SDO, Galv. Shop 766s066661
-i-Proc. C/Stores & Disposal Division
E;. Rx stngl, - FlxecutiveEngineer
223011 227400 9463998419
1 V.K.Dwivedi ASP-III 9417230208
-) Kuideep Singh SDOiC/Store 223191 9478318s4
4 v,:ay SDO Disposal 223011 9417351765
Reviewed and Approved ByPrepared B
srg n
--_-BIIAKRA NANGAL PROJECT
TNTEGRATED MANAGEMENT SYSTEM
BI{AKRA BEASMANAGEMENT
BOARD
TiffiTIONPLANFORnLinuNc srruArroN ARrsrNG oul9j
HYDROLOGICAL FAILURES, EARTHQUAKES OR
.THERS' cootroltq!
Doc. No.BIIDIDESIGN/EAP-Date:12-07-2019Issue No. 02
Page. 46 of88Page Revision No. 0
Dam SafetY Directorate
-- mrTs -I 223089 94639-98230Director
1 Er. Arvind KumarSharma
941,7652752PA / DamSafety
2231792 Rehmat AIi
223311 9463598391SDE/ DamSafety
2231403 H.D.KaPila
ffi,Saiian Singh
94787 -86824ADE/DamSafety
4
9988242642ADE/DamSafety
5
6
9417394568ADE/DamSafety
Krishan Kumar
9417202091
9463%4549
158q,4TOA,
IrusrE,[
S.K. Bedi
Rajesh Vashisht
S.K.Aggerwal
Paramltstngh
c"tp"l St"gh
D.N Sood
fffi; K'trl*.I
-
I Vikas Kumar
Director 223108
SDE/I 2230862
SDE/IIJ
9463698414SDE/IV
49417201184
9463918789ADE
ADE/I5
69464251645
9988165660ADE/II
7
ADEAII8
I\I
By
fi
Prepared RevieweI and APProved BY
oirectfiofisn
BI{AKRA NANGAL PROJECTINTtrGRATED MANAGEMENT SYSTBM
BHAKRA BEASMANAGE,MENT
BOARD
BHD/DESIGN/EAP.Dfie;12-07-2079Issue No. 02Page. 47 of88Page Revision No. 0
,-----I
l
l-
l-----
-T
I
Prepared
ASE-I
Reviewed and Approved By
Dire .ffihlr ]
TITLE: EMERGENCY ACTION PLANFORIIAI{DLING SITUATION ARISING OUT OF
nyoncir,oclcAl, FAILURIS, EARTHQUAKES ORorrrERS. Conf.Olled
Water Regulation Directorate
1 Satish Singla Director 223758 9463598550
2 Mahinder Singh SDE 44
Ilydrology Division
1 JP Singh Xen 223083 75893-03748
2 Manish Kumar SDO/Hydrology 79732-05990
-) v.K Mittal SDO Discharge 223241 94t7334003
4 Naunihal Singh ADE/Hyd. 223083 9465958858
Ilospital BBMB Nangal
Dr. Manjit Singh P.M.O 223012 e4641 37 527
2
;--"--)
Dr.Anita S.M.O 223012 9417853418
Dr.ShaiiniChaudary
S.M.O 223012 94630s8s79
4 Dr.P.P.Singh M.O 2230t2 9417064672
5 Dr.J.P. Singh M.O 223012 9855329394
6 Dr.Sachin Saini M.O 223012 9463824617
7 Dr.Anil Gupta M.O 223012 88474r2738
- BHAKRANANGALPROJECTINTEARATED MANAGEMENT SYST-EryI
BHAKRA BEASMANAGEMENT
BOARD
NFORHANDLING
SITUATION ANTSINC OUT OT HYDRO_L-O_GICAL FAILURES'
EARTHQUAKES OR OTHERS.- Controlled
Doc. No.BHD/DESIGN/EAPDate:12-07-2019Issue No. 02
Page. 48 of 88
Page Revision No'
001
ANNEXURE-XV
LIST CONTAINING SIGNATURE OF ALL PARTIES
@am,NangalBBMB' Nangal
SE. (li;adquarfer),BBMB, Nangal
S,E. Bhakra Dam Circle, Nangal
SE Nangal ffichan'rcal Circle' Nangal;
MB' Nangal
ffiMB,NangalffiBMB,Nangalffipital,Nangal
6.
7.
B.
nilv'reweo and APProved BYBy
ff
Prepared
ASE.I
BHAI(RA BEASMANAGEMENT BOARD
ALTERNATIVE CONTACTS OF PERSONS TO BE NOTIFIED AS PER N. F.C
l)oc. No. I
BHD/DF]SI(;N/EAP L
-Date:12-01-2019Issue No. 02
Page. 49 of88Page Revision No. 0
ANNEXURE-XVl (l&ll)
2
J
4
5
;b
iB
o
1
1
1
1
$.Ng.
l-
1
1
1
1
l;t
i
t!
I
l
I
L
t-I
1
a
Ii _l_
BHAKRA NANGAL PROJECTINTEGRATED MANAGEM EN'I SYSTEM
l.ITLE: EMERGENCY AC.I.ION PLANF.OR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL
FAILURES, EARTHQUAKES OR OTHERS.
r. I Person to be Notifiedo. I
l-S oO 1co ncerneO I a rr akra O'a m
Dam Division
Alternative contact
SDO lnstrumentation Sub Division, Nangal-O1887 -223095,7589303795
SDO (2.d) Bhakra Dam Division -do-7589303795
I XEN Bhakra Dam Division
2''d SDO. Bhakra Dam DivisionI
i
l
XEN RM&SR Division 01887 -223092-0,,94639-98256(M)
SDO, lnstrumentation Sub Division 01887 -223095,
7589303795
er frfangdL__I Fire calls (NFL)
iNGo'sI lo.ri PrnCiiavat
01887-223101
01887-220648
Kangra Welfare Socrety f.tangal-981 5378347(M)
@ourcan-' o 98725263 7 4M)
Supdtt. Procurement, Nangal ASP, Procurement 01887 -22301 1
0. I Canal Hospital, Nangal 01 BB7 -22333 1 -R, 223012 (O)
Civil Hospital Anandpur Sahib 01887-232193
2. I Director, Dam SafetyI
3. I XEN, Bhakra Electrical Divn.
I
SDE, Dam Safety. 223140-0, 94635-98397
-75893-44349
4 IXEN
Townsmp, r.tangat SDO Estate,9417478653
Director, Design, Nangal
xf f.r bfraf<ra uecfra-nrci
, Nangal
5 | oir;aior o".',gnJ\rng,
6. i SDE, Dam Safetyt___7. I xrru, Hydrology
B
9-
Director,Dam Safety-01887 -223089 R, 94639-98230
ADEW
79732-05990
SOf-f -Ousgn DfeW86'q 9463934549
SDO Field Mech. Sub Division,Bhakra
@LPRoJECTrNrncnar@
BHAKRA BEAS
MANAGEMENT BOARD
OR HANDLTNG-^itruarroN ARISING our oF HI?\o-!-o-G-I-cAL
rLu,unns, EARTHQUAKES OR OTH
Doc. No.BHD/DESIGN/EAP.Datezl}'}'l'2019Issue No' 02
Page. 50 of 88
e Revision No. 0
SDO, Nangal Dam
01887 -223522.(R) 941 7861 7 1 1 (M)
@-224612-R87-223080-C
SOE, Water Regulation
01 887 -223043-0, 7 589303748
S-e.1HO;, Nangal
01 887 -2231 64-0, 9417 0-21604(M)
S-e- (HO) Nangal
01 887 -2231 64-0, 9417 0-21604(M)
XENTSHe rqnandPur Sahib
Membel Power' BBMB,Chandigarh
017 2-501 17 54-o, 501 1 755-0
' 5011753-0
ADC, RoPar
SE -Bffii rcle-l l, su nde rn ag ar
01907-262354 0.,
SE. fatwara Circle, Talwara
01883-236013-O,
OV. SecretarY, lrrigation
0172-5011767-o
DSP=opa{, o(E 81 -2201 1 e'
Xff.t ruangal Dam Division
x E N-R rvl & s R D I v i s i o n, N a n g a I
ffition,Nangal
Director, Water Reg ulation
SEBhakra Dam Circle
01887 -2230 1 7-O, 94681 -77095-MS.E. (Ho), Nangal
fficle,Nangal
ffiDam,Nangal
S.E. GenerationCircle, PSEB,Anandpy1 t?U!ffihandigarh
C#irmarr, BBMB, Chandigarh
Oistf trrtagistrate, RoPar
Cfrief fnglneer , BSL, Sundernagar
Chief Engmeer' Beas Dam' Talwara
@handigarh
Reviewed and APProved BY
oire,toh-{ionPrepared BY
Doc. No.BHDiDESIGN/EAP-Date:12-07.2019Issue No. 02
Page.51 of 88Pase Revision No. 0
Annexure-XVII(i-iv)
M-1Emergency event /unusual Occurrence Report
For use when reporting emergencies or unusual occurrences other than eartliquake
oil and hazardous substance spills and bomb threats. For any of the three aforementioned emergencies use the
appropriate repoft fonn because this is a general form, theie will be sections that do not pertain to the emergency
.Only fill out those sections that are applicable to the emergency.
[,ocation----
Brief description of events ( include caller's name and phone number
'1,"1:', ;i:'"
BI]AKRA BEASMANAGEMENT BOARD
BHAKRA NANGAL PROJECTINTEGRA'I'ED MANAGEMENT SYSTEM
TITLE: EMERGENCY ACTION PLANFOR HANDLINGSI'I'UATION ARISING OUT OF TIYDROLOGICAL
FAILURES, EARTHQIIAKES OR qTI{EBS. xr - rLoatroueu
Peftinent Data
Size of affected area-----
[rxtent of damages-
E lfect of operations-------------
Poss ible cause--------
I{ate of discharge---
.Appearance of discharge
I;ore bay elevation----
Appearance of fore bay----------
Fore bay rise rate----- ----------Tail bay rise rate----------
Weather condition---
Injuries/loss of life--------
Witness-----
Others-------
Prepared
ASE-I
Reviewed and Approved ByBy
o'51ry','n"
---- SHAKRA NANGAL PROJECT
rNrEcnarED MANAGEMENT SYSIE\{
r,,q il{.r
BHAKRA BEAS
MANAGEMENT BOARD
HANDLING^^lsiiuerroN
ARTsING our oF HYDRo-L-o-GrcALr
ieriunns, E enrHQU exrs of,orlrERxl gd
Doc. No.BHD/DESIGN/EAP.Datetl2-}7-2019Issue No' 02
Page. 52 of 88
e Revision No. 0
Annexure-XVII FORM- 2
Earthquake Damage Report: For Reporting Earthquakes
The---------- dam (latitude ------------------------longitude-------
Lies within seismic zone---'----- ----where major damage can be expected from earthquake' The dam
has the possibility of being subject to moderate to severe ground shaking from nearby or distant moderate to large
magnitude earthquakes'
Earthquake Damage RePort
Date---------
Person RePorting Information
Feature Affected----
Description of Earthquake Effects
On structural conditions
Type of damage (slides subsidence etc-----------
Location----
SeveritY-----
Movement (direction magnitude)
Defl ection or Settlement Readings--
On hydraulic conditions
Type ofeffect (leakage or stoppage
Location----
Size of affected structure----
Estimated flow or change in flow------
Nature of discharge (including sediment)
Wave action damage-----
Others-------
Site Conditions
Water Surface elevation /stoppages-
Time---------
-{ssrpd BY
StH,ft'd,Rev6wed and APProved BY
BHAKRA NANGAL PROJECTINl'EGRA'I'ED MANAG EM ENT SYSTEM
Doc. No.BHD/DESIGN/EAP.Date:12-07-2019Issue No. 02Page. 53 of88Page Revision No. 0
T'ITI,E: EMERGENCY AC.IION PLANFOR TIANDLINGSITI]ATION ARISING OUT OF HYDROLOGICAI,
FAr LrrRES, EAR'rH QU A"rr t3fi?i6ilua
I
I
Iv
Annexure-XVII(iii)
l,ocation---
Size of alfected area--------
Estimated flow or change in flow-----
Nature of discharge (including sediment)--------- --
Wave action damage----
Other-------
Action
('hangc in operation
Irmergency repairs-----
Sun,eillance------------
Regional assistance needed (examination)---------
Public information provided---
. To facilitate analysis of conditions a map should be prepared showing the location and extent of a
damaged areas such as subsidence areas seeped areas springs and other pertinent data including
the dates of readings and site conditions at the time of observation. This map should be revised
periodically to show changing condition until they are stabilized.
Reviewed and Approved By
Direclor ppsign
Doc. No.BIID/DESIGN/EAP-Date:12-07-2019Issue No. 02
Page. 54 of88Page Revision No. 0
@NANGALPROJECTINTEERATED MANAGEMENT SYS
BT{AKRA BEASMANAGEMENT
BOARD
TiffiONPLANFORn,q,iD LrN G sITUATToN ARrsrN G
-o-yl 9invnnolo Grc AL FATLURE S, EARTHQUAKE- .S O-R
orI{ERs. COntrolleilAnnexure-XVII
Bomb Threat Report: For Reporting Bomb Threat
BOMB THREAT
Place this card under your telephone
stion to ask
Rev'lewed and APProved BY
DirectorM
BFIAKRA BEASMANAGEMENT
BOARD
IiI
Ii
Doc. No.BHD/DESIGN/EAP-Datezl?-D7-2019Issue No. 02Page. 55 of88Page Revision No. 0
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
TITI,E: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL
FAILURES,,BARTIIQUAKES OR OTHERS.-. ICont-rolleo
ANNEXURE-XVIIILIST OF EXPERTS /RETIREES WELL CONVERSANT WITH DAM REPAIRS
Sr.No. Name Present address Contact No.
1 Er. P.A.KapoorRetd.Chairman,BBMB
Kothi No.661, Sector-1 5Faridabad
011-26412801,011-26417639
2 Sh.R.N.AgganrualRetd.Chairman,BBMB
1 I 1 35 Shikha AppartmentsSector-S,Mansa Devi Complex,Panchkula,Haryana
FAX 01 1-41684103
4 Sh. K.K.Khosla,Retd.Chief Engineer,Bhakra Dam
Sharma Store,Nangal TownshipDobetta Colony
01887-22487394178-19290
5 Sh. G.D.GuptaRetd. Chief Engineer,Bhakra Dam
H.N. 600 Sector 10, Panchkula 95172-2585084
b. Er. Y.P.MathurRetd. Chief Engineer (lrr.)
Shikar AppartmentE417 Mansa Devi ComplexPanchkula
0172-4665366-R94170-13507-M
7. Er. R.C.SharmaRetd.ARO (BBMB)
V.P.O. Raipur,Near Mehatpur,Distt. Una (HP)
01975-232781
B, Er.O.P.SharmaARO Retd.(BBMB)
VPO Nangal Salangari Distt.Una 01887-225992
I Sk. A.K. Dharmani,Retd. AE
Panchkula 98157-39732
lssued Bv
,!*Wffi, rReviewed and Approved By
-- BHAKRA NANGAL PRO JECT
mrrcurED@
BHAKRA BEASMANAGE,MENT
BOARD
Ti@NPLANFORnainr,mc srruArroN ARrsrN G
-o-Yl 9iIIYDROLOGICAL FAILURES' EARTHQUAKES OR
oTIIBRS. ContrOlled
BIID/DESIGN/EAP-Datezl}-}1-2019Issue No. 02
Page. 56 of88Page Revision No' 0
Repair and maintenance schedule for upkeep of different components of Bhakra Dam
Annexure-XlX
(l to viii)
steps would
maintenance. As an inPut
suffice. The
manual.
Daily:
. General inspection of civil works
o General cleaning of the dam and galleries
FortnightlY: -
. Emergency doors in spillway galleries
. SanitarY fittings
. Cleaning of SumPs & drains
MonthlY: -
. Joint drains & intermediate drains
. Clearance of glass etc from d/s face block joint
. Cleaning of d/s glazing of elevator towers
. Mosaic floor Polishing in Dam
(El1225ft, 1668 ft & 1700 ft)
Yearly: -
. cleaning of Air Headers of R/o and blowing of piezometric tubes
. Maintenance of air flow meters and air vents
. Replacement of sealing compound of contraction joints
o Repair of approaches to drain holes & ground water holes
adjunct to the
time schedule
avoidance of an emergency, some of the suggestive
should be adhered to as stipulated in operation &
Rt'rewed anilAPproved BY
oirectffiionPrepared
ASE.I fi
BHAKRA BE,ASMANAGEMENT BOARD
Doc. No.BIID/DESIGN/EAP-Date:12-07-2019Issue No. 02Page. 57 of88Page Revision No. 0
Annexure-XIX(ii)
. Clearance of D/S rock benches on both abutments
General: -
. lnspection of u/s face of dam
. lnspection of outlet & Penstock gate guides
. Maintenance of drain holes in draft tube when dewatered
List of number of instruments installed in and around the body of dam to keep a
watch on perlormance and to provide useful data (as mentioned below) should be
displayed at site also. The periodicity of observation on these instruments should
bestrictlyfollowed(ascontainedin O & M also)
SETAIL BF INSTRUMHNT"$ .IN tshfAKR.A BATVi
Er:scriptio n of LctrittioftT*"{str'*-r rfi.{1!xt
$T$l,f;SS *r*EYHR5 Bl*:*lq I* Ftw/L:":t14*rt mfiily: it.t"JL :5tial :f),1O ft:Tra'r*t1 ."1 r.J{:t:k. $tr,?Lqr 1..&**{t
11!r".,:...,
STft&I$I s.$H-['HR# B$s*k* 5.e{}&"s
J(}}NT MHTtrRs Hls*kts,?$&?-$
Fqrrlnr*hlly
HL 1fi8;5F{ls:r:k ?{.}
BHAKRA NANGAT, PROJEC'IINTEGRATED MANAGEMENT SYSTEM
TITLE: EMERGENCY ACTION PLANFORt HANDLING SITUATION ARISING OUT OF
TIYDROLOGICAL FAILURES, BARTHQUAKES.ORorHERS. ci,ntrolleo
Peri{}diaity {}ffflhs{tr-vixti&fis
T*tal Hrs, trfI.ngtr,Lr m &,El!ls.
Fffrtn'l:!lhily
Reviewed and Approved By
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
BHAKRA BEASMANAGEMENT BOARD
TITLE: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL
FA ILURE s, E ARr H QUA"rt oFo-I,4f$Slle il
Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02
Page. 58 of 88
Revision No. 0
Annexure-XIX(iii)
5r-NC'.
Description ofIr.lstrurrrent
LocatisrI Tota! Nc- oftrrrstrLrrlrerrt_s
Pericrdicity ofrOt serrlations
6" STRUCTURALtr.E5trCIT{SERECOR.DETT.S
,EL 10A3 Bl$ck20 8{ PP- EL1:_50
2 Forinightly
7. S_TRONG MOTIONACCELEGR()PHRESA IV
EL&20
160A-1378to83 Block
3 Fortnightly/As &when requined
a- STR(}NG TV]C)TIOT\JACCELEROGRAPHTTESI\
EL 154a L./S &Ft/5
2 Fortnig htly/as. &when requlred
9- STR"ONG TqOTIONACCELERCIGRAPI-IA800
EL1608, ]-3V8,1043
EXssk 20&1362 DinkY--I-unnel
4 Fortnightly/As &.when requi_red.
10, GR()UT\ID \^/ATER,HOLES
Left & RightAtrutrnents
25-i-l-4:39r* R-
Below RWI160(}-Fortnightly' "
AboveR\A/L1600*Weekit :
5r-l\I6-
trescr-iption crfIrrstrLr rrterat
Locatf o[l -I-otal No- ofInstrLrrrrents
Periodicity ofOlr:serarati orr s
1-1-- 1^/A-TER -TUBETTL-TMFTER
PP-I(U nit-I)Er._ 1150
1 M(frlthly
12. PLIJMB LINE Block15"204125
3-Linesa3-Cabines
Daily
13- DR.AI[\J HOL.E DarnEalleries-55e,4(Ja.b{,.! trrr entsa66
724 FortnightllT
L4- L'PLlFTPR,ESSUR.E PIPE& UPP cLtrn DHs-r)Ar."'1 POR'TIOF'}
In warlousGa!leries
53-+-a4:67 Beiow R\NL a600FortnigFrtlYAbowe R\A/L 1500\n/eekIy
_L 5. UPLIFTPR.ESSUREPIt,E5.-PP-I
EL 1a27-50-34 hl(}s.EL 1150-6nlos-
4D For-tnigl*ttly
eviewed and Approved BY
oi,".@.isn
BHAKRA BEASMANAGEMENT BOARD
Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02
Page. 59 of88Pase Revision No. 0
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
TITLE: EMERGENCY ACTION PLANFOR. HANDLINGSITT]ATION ARISING OUT OF HYDROLOGICAL
.,Tr"r*rs, EARTHQUAKES "i "Iitr&Iled
Annexure-XlX(iv)
Precise Geodetic Observations
To watch the structural behaviors of Bhakra Dam, its appurtenant works, U/s & D/s rock
abutments and periphery of reservoir upto'10 Kms, top of dam, a network of survey
points has been installed. lt must be ensured that work on these points is carried out in
two phases as enlisted in operation manual.
t)$TATF{"$LGE SYSTHI!!Ilrainage ,sysEerr:r Ixr arrd as'rrund t?re botly of Darrr"
INSi'T:}ECTT(3!\IO ?r,lAXI\ITEN'TLI\ICH F!il\ltf,} CHECI(Ir\IG llclISC" ITErvtS.*. Splllraray e;>rxrrt gallery errrergerrcy ctesil.ire Sates-
€trean*rrg of, aIr freader of Fl"iwer Outletsq' Blourir*g of piexormeter tr"rbes.i> F4airrtenag.rge Of air ftor.rr rneter- SteplaCerreent ot
darrragerl sealing cstrrpour**{ im cr:rrrtraction jcrints ofrrarl<rr.rs GrIscks *rn top of darrr-
+ 1*trainterllarlCe crf ,approactres t0 draln *rt:les or: Left arrdSaigtrt abutrvrerrts-
+ Cteararrcs of l)"r's; roc*<-nibs tren,ct"*es sri troth abrrtrrrents.+ l"-lplift If ressure pipes irt the botiy of l}arrr, Pouven Plants,
cirainr hsles and grcrured v\rater troles to indicate tfrat ttredriainag€ ctr!rtairt prorrided for the punpos* isfu rrctio n inq eff,ectirreIY.
Reviewed and Approved By
BHAKRA BEASMANAGEMENT
BOARD
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02Page. 60 of 88Page Revision No. 0
TITLE: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL
FAILURES, EARTHQUAKES OR OTHERS.
E L H C-r[q.l C.c\.L F E^A-r[-] SR. E$PO\/!TETq Ar\IE} GOhITFT()L SYSTETVI
FotrIornrImg four substations ( 3B AO / 4 t- ,5\rc'lts) frarr_e lrreen prcl,rldetI irr t]re bodyof clarr:- Eler.rator sfraft:surhrstatiorr In trlcrct<I-y at €L
l- z x"3 -5t} fr- Hoist slraft sute station in block I2B at EI-
r_2I_3-5(} f,to-- Etrerrator to\Arer srrtrstation ir"r blocl< L7 at EL
,- 6a4 ft- I{oist tornrer sul> statir:rrr irr block 2B at EL
r- ss.4ft
CIfi!"CtJI-r GtIt.EAil<EFtS Ar IS(}LA-FrNGslrvlT'clt Es
+ trnspection, testing and rectification <:fsl..vitch getsrloil irrrrnersed circuitbreakers are done at Ieast once a yearpreferatlly after. errery 6 nl<>nths*
+ Operating rnechanisi-n, iUbrication ofrnechanical parts, c<>ntacts, tBnks, ailInsulators, insulating oil sh<>uld becl-recked periodically and L:e setright/replaced if requlred irnrnediately.
Reviewed and {pproved By
I]HAKRA BEASMANAGEMENT
BOARD
BHAKRA NANGAL PROJECTINTEGRATED MANAG EM ENT SYSTEM
TITLE: EMERGENCY AC.TION PLANFOR TIANDLINGSITUATION ARISING OUT OF HYDROLOGICAL
FAILTJRES, EARTHQUAKES OR OTHERS.
Controlled
Annexure-XlX(vii)
TRAN$FORMHRS* A rtgld system sf inspectionltesting *ild
recondititrning tras heen snvisagtrd in theoperation rnanua[:
Checki*S *il level, relayseantaets, fuses l*adlvoltage &tc.
Month ly
checktns th; uu*r*lnsffi gsl Qua rt*rly
ehecklng nil in transforrner fardieleetrie strength & watercsntent
Annually
Checking oil in transfnrmer foracidity and sludge
Alternate yea r
Overall inspecti*n andmaintenance
fvery 5 year
some other works to be attended to have been enlisted as below:'1. Penstock high head gates: Capital maintenance of each Penstock head gates should be
. carried out after every five year as per maintenance schedule drawn
2. Low head maintenance: -
Inspection of gate & roller in position be made by lowering the penstock stop logs in
respective unit as & when low head is achieved.
r. Penstock liner. Penstock Iiner should be visually inspected during shut down of
machines & repair / painting be carried out every year or where needed.
Prepared By Reviewed and Approved By
i
L
Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02Page. 6I of88Page Revision No. 0
ASE.I sign
BHAI(RA BEASMANAGEMENT BOARD
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
TITLE: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL
FAILURES, EARTHQUAKES OR OTHERST
Controlled
Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02Page. 62 of 88Page Revision No. 0
Annexure-XIX (viii
Penstock trash racks:-
lnspection of Penstock trash racks be carried out through divers every year as &
when level as achieved to enable divers to make such inspection be got carriedout through remote operated vehicle to sufficient depth.
4. River outlets:
Capital maintenance of R/o carried out as per five year schedule drawnlnspection of R/o U/S conduit, U/s gate D/s liner by lowering emergency gate be
carried out very year as per schedule drawn
5. Radial gates:
U/s & d/s portion of all the four number radial gates be attended to meticulously asper o & M to ensure that gates are in proper working conditions.
Yearly inspection of all the permanent mechanical installation before & after everymonsoon period must be ensured by the field
Through inspection of Civil structure be ensured before & after every monsoon
Exposed surface of spillway and training walls and submerged portion of spillway &
its apron be inspected after floods visually, by divers and by using pneumatic caisson
system.
AII other instruction as contained in O & M of Bhakra or any other drawn schedule
later on be followed in the field stricfly.
Prepared By
BHAI(RA BEASMANAGEMENT BOARD
BHAKRA NANGAL PROJECTTNTEGRATED MANAGEMENT SYSTEM
Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02
Page. 63 of 88Page Revision No. 0
TITLE: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL
FAILURES, EARTHQUAKES qR OTHERS.- -.Controltcu
Annexure-XX
'-:'- **: - ::':i: L'" -li
=--P i i ii-flui,^, ; ;. iF.q..I -r € -j \I: il r'i;';4 :l -'i{
r^-{ -l p 16 6..-- -l t { *: :l { 3 ei","+=* ''l ! d- ?al :l .$ i ,Y// :\l < o
(ili.i\\ t:i, t'i1I
\,.,.{:'a<.;;-)) i-\\. .^
'r \l:--- - ,l .:\. \----'j) (,a o
\ rld'-,7 1 ,.,t)\ \r 1{ // ./', //\\ \N \r-:=-=e-, //
*:r::j:-:.:: :f1;K.
.t..' ...-.--- .:
i.
,:
Ml;
$\r_
Eroc3\+
a\'\\^\\r .i-\E\1..r.-)-ii('
li El \\
il --,=/l UirA ll
//.: ////* //z
::-. ''.;'E^-) -3156 ^'j-c r:-Y .r*+ ';
r>:t
ol&os'&:: uc<{ M
lu5r:4.:
\.'r\\'.\\\r\){:r=.i.
\.r\r\
\
f"-.q:
!-
a)
a:)
{.9I6q-J*{{)ft{L r*J
)--
c( i^L& "L!J
I-- :"
L:dr5
;d.r'{L-rl Ctl .
,q lc
*-- /r\(-3_r{/};rrq
3"q_o-
:L.lra{;
!'l
si6r(,
I
o
"t{
,&{J
tE
J
3cr(.fiq
?f1f{3
:g.-e
- .,(!.,.i I i:-
a,+
b
*r
_c
J,t_gz
ri
::,d]0'!g
{:r
E"//t ,/ o*,'+Yr4
F(J*c\
Reviewed and Approved By
Doc. No.BHD/DESIGN/EAP.Date;12-01-2019Issue No. 02
Page. 64 of 88
Page Revision No. 0
REQIREMENT OF MACHINERY FOR CONSTRUCTION ACTIVITIES AT EMERGENCY
SITE
1. Diesel pump sets complete with suction
And delivery Pipes
2. Electric pump sets 5 HP to 40 HP with accessories
3. Generator sets
4. Compressors
5. Concrete Mixer (electric)
6. Concrete mixer (diesel)
7. Sheep foot rollers with frame complete
8. Chain Dozet D4,D6,D7,D8
9. Poclains
10. Front end loader
1 1. Wheel dozer
12. Tippers
13. Pneumatic comPactors
14. Crane 30T, caPacitY
15. Dragline 1 cum caPacitY
16. Concrete vibrators
11. Shuttering plates with she bolts
18. JCB Machines
19 Water sPrinklers
10 Nos
10 Nos
6 Nos
4 Nos
5 Nos
5 Nos
6 Nos
8 Nos
4 Nos
2 Nos
2 Nos
30 Nos
2 Nos
1No
2 Nos
6 Nos
400 mtr
4 Nos
4 Nos
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYS]TEM
q:!i-. 'i!id
BHAKRA BEASMANAGEMENT BOARD
rnt f' nnnBnCENCY ACTION PLANFOR HANDLING
SITUATION ARISING OUT OF HYDROLOGICALFAILURES, EARTHQUAKES OR OTHERS.
ANNEXURE.XXI
Reviewed and APProved BYPrepared By
BHAI(RA BEASMANAGEMENT BOARD
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
Doc. No.BHD/DESIGN/EAP-Date:12-07 -2019Issue No. 02Page. 65 of 88Pase Revision No. 0
TITLE: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF TIYDROLOGICAL
FArLURE s, E A R]. H Q u A.'tffio9#t$rgO
S.No. Description Qtv Present condition Remarks1. Euclid Trailer 1 Working1 Trailer 1 -do-
3. Tata Tiooer 12 -do'4. Water Sprinkler 1 tlo
5. Lorain Moto Crane Co
6. Mini Speed Shovel Crane 1 do
t. Voltas Omeqa Crane I -Co-
8 Mobile Crane 1 GO
9 Tata Draqline 1 dtt
10. Hvd. Excavator 1 do
ll Front End Loader 1 do
t2 Excavator cum Loader 2 do
11_t4
Crawler Dozer 2 -do-
Wheel Dozer I -do-
15 Motor Grader 2 One No. not inworking order
ANNEXURE-XXII (I & II)
[,IST OF MACHINERY WITH XEN BHAKRA MECHANICAL DIVISION, NANGAL
'['he machinery is generally stationed at EI-I400 Bhakra Dam when not in use or for repair &maintenance work. Quarter wise the machinery is deployed/statiorred at work site for which joborder is received by Sub Divisional Officer, Field.
Note: List of machinery received from SE, NMC, BBMB, Nangal
Prepared
ASE-I
By
fi
Reviewed and Approved By
Direetor Q@sign
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
BHAKRA BEASMANAGEMENT BOARD
TITLE: EMERGENCY ACTION PLANFORHANDLING SITUATION ARISING OUT OF
HYDROLOGICAL FAILURES, EARTHQUAKES ORorHERS. controlled
BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02
Page. 66 of 88
Page Revision No.0
ANNEXURE-XXII(ii)
LIST OF OPERATORS
Sr.No. Name of OperatorS/Shri
Designation ResidentialAddress
Machine Contact No.
Sh. Som Raj Dumper
Operator
8-B BBMB Colony,
Nangal T/ship
Trailor 988816583
2 Narinder Paul Euclid Operator 9-P BBMB Colony,
Nangal T/ship
Tipper 1696196244
3 Sh. Janak Raj Tipper Operator Vill. Morbarhi P.O.
BhatoliTeh & Distt-
Una (HP)
Trailor Tipper 9418662638
4 Gopal Krishan -do- 19-WI/BBMB
Colony Nangal
Tipper 94]l14-08301
5 Arjan Singh Shovel Operator 19-J BBMB Colony
Nangal
Shovel Operator 9041 17 1181
6 Kamal Kumar De-Mag
Operator
3-l,Nangal JCB 98 1 5008628
7 Bishan Dass Loader Operator 2-SIBBMB Colony
Nangal
Loader Operator 9417 5-237 18
8 Ashok Kumar Dozer Operator 43-LtsBMB Colony
Nangal
Dozer 99r5160913
9 Gurbachan Singh Driver 29-0, BBMB
Nangal
Tipper 94170-55906
10 Partap Singh Tipper Operator iO5-06/FF /BBMBColonv Nansal
Tipper 991 5t47419
lt Rakesh Kumar -do- 286/G/BBMBColonv Naneal
-do- 98 1 660796 I
12 Satish Kumar -do- 599-G/BBMBColonv Nangal
-do- 9876001205
t3 Raman Kumar Dozer Operator 65-HHIBBMBColony Nangal
Dozer 9464869324
14 Nishan Singh Shovel Operator 32-FIBBMB ColonYNangal
Poclain 1888445478
Reviewed and Approved BYPrepared By
BHAKRA BEASMANAGEMENT BOARD
BHAKRA NANGAL PROJECTTNTEGRATED MANAGEMENT SYSTEM
Doc. No.BHD/DESIGN/EAP-Date:12-07 -2019Issue No. 02
Page. 67 of88e Revision No. 0
TITLE: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL
FAILURES. EARTHQUAKES OR OTHERS. tCnnfrolle{l
ANNEXURE-XXIII
I,IST OF MACHII{ERY/EQUIPMENTS WITH BSL PROJECT SUI{DERNAGAR AND BEAS DAMTALWARA
Sr.No. Nomenclature of Equipment Total number of Remarksmachinery
a)1.
2.
3.
4.
5.
b)1.
c)1.
2.
Heavy Earthmoving EquipmentsL&T Poclain shovelCatterpiller wheel dozerCrawler TractorMotor graderExcavator point end loader'funneling EquipmentsG.D. Grout Pump
Construction EquipmentsDritling machines
CranesPumps
Type Pump,
3No1No2NoI No.2No
2No
5No3No45 No. V.T.Pumps, SS
SubmersiblePump,BareHole pump &
' Sump pumps etc
4No3No1No
9No1NolNo
1No1No.
4. Air compressor5. Generating set
6. Concrete mixer(d)l. TMB Tipper2. Water sprinkler3. Road Ruller
1. JCB2. Dozer
Note The above machinery will be available, if free from repair/maintenance work
Talwara Circle, Talwara
3. Tipper 4 No
Note The above machinery will be available, if free from repair/maintenance work
List of rnachinery/equipments received vide SE,Bhakra Dam Circle, BBMB, Nangal vide letter No'7455-
56/BM dated 9.8.2007.
Reviewed and Approved BY
DirqlEpesisn
\
BHAI(RA BEASMANAGEMENT BOARD
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTE M
TITLE: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OT]T OF HYDROLOGICAL
FAILURES, EARTHQUA".T q)gfrfPdfied
BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02
Page. 68 of 88Revision No. 0
ANNEXURE-XXIVLIST OF CONTRACTORS
-l
I
l
I
't
I
i
I
I
Sr.
Nos
Name and address Contact No. Machinery with the Contractor
M/S Sh. Harvir Singh Govt.Contractor, Vill. I(otla teh-Anandpur Sahib, Distt-Ropar8B)
9417 t947 15 Tractor, Mixture. Vibrator.
2 Sh. Baldev Raj Govt Contractor ,
Vill- Gag P.O. Jindwari Teh-Anandpur Sahib, Distt-Ropar(PB)
94t7559t60 Tractor, Mixture. Vibrator.
J M/S Sh. Inderjit SinghContractor, Mohala Bhaura,Anandpur Sahib, Distt-Ropar(PB)
9812033621 Mixture, Vibrator, Tractor andShuttering material.
4 M/S Salamipur Co-Op L&.CSociety Ltd. V.P.O New malikpurTeh-Nangal. Distt-RoparGB)
9501200029 Tractor, JCB, Generator,Mixture, & Vibrator
5 Sh. Subhash Chand Contractor22-Kilan Area Nangal. Township.Distt-Ropar(PB)
9815391770 JCB, Tractor, Mixture, Water,tanker, generator.
6 Sh. Neeraj Kumar Vill- Thalluh,Teh - nangal, Distt-Ropar(PB)
9872361393 Tractor, Mixture. Vibrator.
7 Sh. Paras ram Sharma Govt.Contractor, Vill. Bunga Sahib,Distt-Ropar(PB)
9818229800 Tractor, Mixture. Vibrator.
8 M/S R.R Builders #33- RailwavRoad Nangal.
9417501322 Tippers, Road Roller, Paver.JCB, tractor grader, MixtureGenerator, Mobile concreteplant.
9 Sh. Raman Kumar Govt.Contractor #2 BBMB, Hospitalcompound Nangal T/Ship. Teh -Nangal,Di stt-Ropar(PB )
9812281703
10 Sh. Chander I(shore Govt.Contractor VPO Basdehra, Distt-Una(HP)
9882952040 Tractor
Prepared B
ASE-I
Reviewed and Apploved By
BHAI(RA BEASMANAGEMENT BOARD
Doc. No.BHD/DESIGN/EAP-Date:12-07 -2019Issue No. 02Page. 69 of 88
Pase Revision No. 0
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
TITLE; EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL
FATLURES; EARTHQUAKES OR OTHERS.
ANNEXURE-XXIV
LIST OF CONTRACTORSSr.
Nos
Name and address Contact No. Machinery with the
Contractor
l1 Sh. Avinash Kumar GovtContractor Vill. Gag. P.O
Jindwari, Teh. Nangal DisttRonar(PB)
98s5282387 Tractor, JCB, Mixture,Vibrator
12 The Dasgrain Co-Op LeCSociety Limited, Dasgrain, P.O.
Jindwari Teh Nangal , Distt-Ropar (PB)
99r5718455 Tractor, JCB, Mixture,Vibrator, Generator Set,
Drill Machine HackHammer
t3 Sh. Raj Kumar Govt Contractor,Vil- Patti P.O. Manakpur Teh .
Nangal Distt. Ropar (PB)
83 520805 83 Welding Set, Drill Machine,Grinding machine, Cuttingmachine, mixture, tractor,iack Hammer and Vibrator.
l4 Sh. Kundan Lal Contractor, Vil-Thalluh Teh Nangal Distt.Ropar (PB)
9872383589 Tractor, Mixture. Vibrator.
Reviewed and Approved BY
Director #4,Prepared
ASE-I
By
({
BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02Page. 70 of 88Pase Revision No. 0
Sr.No. Name of Firm
1. M/s Gammon lndia Ltd. Gamman House, Veer Savarkar Marg, Prabhadevi Mumbai-400025 O22-
56614000, Tel: +91 2261114000 Fax:+ 912224300221, Emall: qammon@gammonindia.com
2. M/s Madhucon Projects Ltd, Flat No. 307 & 308, Third Floor Corporate Sewa Park, M,G. Roaci -
Gurgaon -122 002 lndiaTel: +91 124235234 Fax. +91 1242359234
Email : nd.hrd(Oma"dhucon. gom
3. M/s Malana Power Company Ltd. (MPCL), Bhilwara Towers, A-12, Sector -01, Noida-201301,
NCR Delhi fef: +91-124-2541810. Fax: +91-124-4277841.
4. M/s Larsen & Toubro Ltd, SCO 32, Madhya Marg, Sector 26D, Chandigarh, 160019 Phone:
0172 464 6845
5. M/s GMR Energy Ltd, $fu$ru Ar*b*ia-Chand:garh H.xpr**sivxy$ i$)) i-imlt*d R**1xnillx;*,
ilhern*igsr"i: R*aJ,Zir*Lpui"- 14t] fi*3, PLrnjxi:, lndi* Tel +91-1762-288198/288199
6. AFCON$ ITqFRA$TRIJCTI"IRE L!MITTD
AFCOhIS House, 16, Shah lndustrial Estate, Veera Desai Road, Azadnagar, Andheri (West;
Mumbai400053, lndia Tel: +91-22-6719 1000
Fax. +91 -22-2673 AA4712673 0026
7. M/s Essar Power Limited., (EPOL), Essar House 11, Keshavrao Khadye Marg P.O.7495,
Mahalaxmi,Mumbai-400034 lndia Phone: +91 (22) 6660 1100 Fax: +91 (22) 2495 4787 e-
ma i I : eggarpqwer@-essar. com
S. M/s Tata Power Company Limited, Bombay |-'ior"rs*, l-"{*mi M*di Str*et, F*rt, tulunr*ai *
s. 40*il0r .3{91}:??:t577-43$$, SS$$Sa8?, $?:t71WA+{$1)-2?-SSS5&E*1 , 0*S5SSS71 *Sr-ffi_*l$j
BHAKRA BEASMANAGEMENT BOARD
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
TITLE: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL
FAILURES, EARTHQUAKES OR OTHERS.
Annexure-XXV
Reviewed and Approved By
Direqt[r Ddlign
BHAI(RA BEASMANAGEMENT BOARD
BHAKRA NANGAL PROJECTINTEGRATED MANAG EM ENT SYS'TEM
Doc. No.BHD/DESIGN/EAP-Date:.12-07 -2019Issue No. 02
Page. 7l of88Pase Revision No. 0
TITLE: EMERGENCY ACTION PLANFOR HANDLINCSITT]ATION ARISING OUT OT- HYDROLOGICAL
FAr LURES, EARrrr QUAKWS&ffimBd
1. M/s Torrent Power AEC Ltd., Nead Sffiee fsflrsslf Fmwe,r Limited, CIid Agra R*md, Anjur Fhata,
2. ilhiw*ndi 4?13*?. Fh Sq** S?$22 - ?41S**^
3. M/s Reliance Energy Ltd, H Block, 1st Floor, Dhirubhai Ambani Knowledge City, New
Mumbai Maharashtra 400710Tel: 022-3038 6010 Fax: 022-3037 6622
email : abhijit. banerjee@rel.co. in
4 M/s Kudos Agrohols Ltd, VILLAGE KURANWALABARWALA ROAD
DERABASSIPATIAI-A -Punjab - INDIA
e-rmail :agroholskud@hotmail.com
5. M/s Jai Prakash Associate Ltd., Sector - 128 Noida Uttar Pradesh2O'I304
Tel: 0'1 20-4609000 Fax: 0120-4609496
e-mail: ial. investor@jalindia.co. in
6. M/s HEG Ltd, Secretarial Department Bhilwara Towers A-12, Sector 1 Noida (UP) 201301 NCR
Delhi e-mail : narender.iain@lnjbhilwara.com
7. M/s Deccan Cement Ltd, 6th Floor, Deccan Chambers 6-3-666/8, Somajiguda Hyderabad -
500082 Andhra Pradesh, lndia Tel: 040 - 2331 01681 05521 0555 Fax: 040 - 2331 8366
e -mai I : info@d*c*-ftncement-s. com
B. Mis Kineta Power Pvt. Ltd, 4TH Fk:*r, Kin*ta Towers Piot l{i:.S1 to S4Venkteswara, Hills,
i-iyderabad-5S0034, Xg1' +(91 )40-23352S72173l7 4
-{ssqqd By
f,h&$H,Prepared
ASE-I
By
$
BHAKRA BEASMANAGEMENT BOARD
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
Doc. No.BHD/DESIGN/EA}'-Date:12-07-2019Issue No. 02Page. 72 of 88Page Revision No. 0
TITLE: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL
FAILURES, EARTHQUAKES OR OTHERS..
uortrollei
Sr.No. Name of Contractor
i) Sh. Harbir Singh of Kotla
ii) Sh. Vinod Kumar of Nangal
iii) Sh Sardari Lal Village:Gag,near Ganguwal
iv) Sh. Rajinder Kumar of Ghanauli
v) Sh. Ravinder Kumar of Lohand
ANNEXURE.XXVI
LIST OF CONTRACTORS FOR LABOUR ARRANGEMENT
Contact No.
94172-94715
991 50-88349
94115-01332
98557 -29031
9417s-23930
Reviewed and Approved ByPrepared
ASE-I
By
fi
BHAKRA BEASMANAGEMENT BOARD
Doc. No.BHD/DESIGN/EAP.Date:12-07-2019Issue No. 02
Page. 73 of 88
Page Revision No. 0
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
TTTLE: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGTCAL
FAILURES, EARTHQUAKES OR OTHER.II Ir ontroueo
ANNEXURE.XXVII
LIST OF OFFICERS TO BE INFORMED OF FLOODSWhenever the releases downstream Nangal Dam including escapages at Lohand and Nakkian are more
than 14000 cumecs (50,000 cusecs) the flood warning are required to be issued by Executive Engineer, Nangal
Dam Division through Police wireless and canal telegraph systems to the following:
1. Central Control Room, Civil Secretariat, Punjab, Chandigarh
2. Flood Control Room, Sinchai Bhawan, Sector 18, Chandigarh
3. Chief Engineer, Drainage, Punjab, Chandigarh
4. Chief Engineer, Canals, Punjab, Chandigarh
5. Deputy Commissioner, Ropar
6. Executive Engineer, Ropar Headworks, Ropar
1. SDO Ropar Head works, RoPar
I1 addition to above, tlie following officers may also be intimated
1. Financial Commissioner, Revenue ,Punjab, Chandigarh
2. Commissioner, Jalandhar Division, Jalandhar
3. Commissioner, Patiala Division, Patiala
4. Commissioner , Ferozepur Division, Ferozepur
5. DePutY Commissioner, Ludhiana
6. Deputy Commissioner, Kapurthala
1. DePutY Commissioner, FerozePur
8. SDM AnandPur Sahib
9. SHO,Nangal
i0. Concerned Railway Authorities
"":::: "KvReviewed and Approved BY
Direcffiisn\
tsIIAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
TITLE: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL FAILURES,
EARTHQUAKES OR OTHERS.
Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02Page. 74 of 88
Page Revision No. 0
Annexure-XXVIll
BHAKRA BEASMANAGEMENT BOARD
LIST OF EMOPLOYEES OF RM & B.S.R. SUB DIVISION BHAKRA
l
l
Il
I
II
l
I
Sr.No. I Name (S/Shri) Designation. Address Contact No.
List of Employees of BSR Sub Division
I I Sh. Kulwant Singh J.E. 27 -Wl nangal. | 941714577 4
Township I
2 Sh. Naresh Kumar J.E. 6-.4A NangalTownship
9417484787
1J Sh. Balwant Singh Chargman 12-MKT NangalTownship
94t8718473
4 Sh. Sanjay kumar Diesel Mech. 89-DD NangalTownship
981,6214969
5 Sh. Madan Chand Boat Driver 6-DD NangalTownship
9816137897
6 sh. Dev Dutt Fitter Vill. Sukhsal TehNansal Distt-Ropar
9815747205
7 Sh. Davinder Singh Chargeman 16-GG NangalTownship
9814494441
8 Sh. Shamsher Singh MTO 1-F Nangal Township 94t7 414357
9 Sh. Manjit Singh Carpenter 211-212-G NangalTownship
8360757795
10 Sh. Sher Singh -do- 35-G NangalTownship
8872768006
11 Sh. Raj Kumar Boatman 443-FF NangalTownship
9814387196
t2 Sh. Subash Kumar Helper 330-G NangalTownship
987291436 /
13 Sh. Som Nath -do- l2-B.DlC NangalTownship
858091 9782
t4 Sh. Suresh Kumar -do- 61-G NangalTownship
991 s 1 10626
15 Sh. Diwan Chand Beldar 408-FF NangalTownship
9592535738
t6 Sh. Darshan Singh -do- 114-75-G NangalTownship
7s89095078
t7 Sh. Jai Singh -do- Vill- Handola feh &Distt-Una (HP)
991611r2e7
t8 Sh. Maman Chad -do- 7837102061
t9 Sh. Anil Kumar -do- 351-FF Sh. NangalTownship
8872663786
20 Sh. Bachh Rai Chowkidar 150-DS/I1B 35t-t'FSh. Nangal TownshiP
y / /y+o6JJ6
tBv-L\
(MR)-i::: fif Reviewed and APProved BY
oi,...*(ion
I
I
BHAKRA BEAS
\4AM9lrvlENI !e4B8
Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02
Page. 75 of 88
Page Revision No. 0
BHAKRA NANGAI, PROJECTINTEGRATED MANAGEMENT SYSTEM
TITLE: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL
FAI LURES, EARTHQUAKES oR orH nn$gaflCoBtIL^.".
22
23
24 Mohan Lal
Prep.ared By
ASE-I
28
29
I
1
aJ
;-)
aaJJ
-)t
H.No 81-DD, Nangai
I 38l
lrql
t---140i
l
t--41i.____
i
l
4-CDIC 351-FF Sh. NangalTownshi
9988162897Sh. Karan Singh
2-CDIC Nangal Township 9465009689Sh. Madan Lal7696109110Choi Bazar Anandpur Sahib.
Distt-RooarDinesh Kapoor
93s6367930Vill-Johal P.O manakpur. Teh
, Distt-RoparPatwari
Q. No.36-HH Nangal, Distt-Ropar
809422\272Pardeep Kumar
9464242052Q. No-17-DS/EESuperviserChander Kanta8427864852Q.No.7-G/DC Nangal
Townshi9888569960Q.No.347-G Nangal
981s752560Q.No.6-B/DS/Rly NangalTownship
Paramjit kaur
8556924910VPO Golini, Teh NangalKuldeep Kaur
750806958 1Q.No. 83-TS Nangal Distt-
8427890255Q.No.27-X Nangal Township
Nangal Colony, Sharma Store
Bhakra Road, Teh Nangal.,Distt-Ropar
9417589172Subhash Chander
94635 1 5660Q.No 306-G NangalTownshi
Helper
8441635309Q.No 11 -S Q.No.34l-GNansal Townshi
Ravi Parkash
9779663323Q.No/ 37-B/DS Rly
Q.No.347-G NangalDarshan Singh
9464650312
q50 1 8+23 06
Vill- Dabeta, Teh Nangal,Distt-Ropar
Balwinder Kumar
Q. No.4-5 Lab NangalTownshi
Kanhya lal
6463390091Q. No.5O-TS/EE NangalTownshi
Govind
7508417222Q. No.83-TS/EE NangalMotian
700933 1 1 50Ashok Kumar
Reviewed and Approved BY
oi,&,r8usignI
BHAKRA BEASMANAGEMENT BOARD
BHAKRA NANGAL PROJECTINTEGTiAT"ED MANAGEMENT SYSTEM
Doc. No.BHD/DESIGN/EAP-Datetl?-D7-2019Issue No. 02
Page. 76 of 88
Page Revision No. 0
TITLE: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL
FAILURES, EARTHQUAKES OR OTHERS.
Controller
i42 Manoi Kumar Foreman H.No 1-O. Nangal 9417333077
43 Balinder Sineh Foreman Vill-Surewal, PO; Dher 9463192613
44 Chaman lal Work Mistry H.N 13-S. Nangal 991 s832880
45 Bhupinder Kaur Electrician H.No 23-R, Nangal 9463823632A/+o
i
Pawan Kumar Electrician H.No 6-K, Nangal 9463696118
47 Tarsem Lal ACO H.No 1-O, Nangal 98761,77866
i48 Ansrei Sineh ACO H.No 13-U. Nansal 7589238189
i49 Surinder Kumar Mason H.No 22-L, Nangal 9915826357
50 Satish Kumar Carpanter VPO- daroli, Teh -APS 9s92236411
51 Nirmal Sineh Risser Vill-Bhabour Sahib, PO-Bass 9878847429
52 Nav Rattan Risser H.No. 18-N, Nansal 7589953488
i53 Manieet kumar Painter H.No. 92-DD, Nansal 9417973319
54 Paramieet Sineh Painter H.No. 475-76 G, Nangal 9411973s52
r 55 Mahan Sineh Crane operator H.No. 19-G. Nangal 987892967 3
r56 Raiesh Kumar Crane operator H.No. 28-J, Nangal 9459411440
57 Tersam Lal MLO Vill-Khulmi, PO-Bhakra 98055781 14
58 Manohar Sineh Fitter H.No. 32-DD,Nangal 9463386695
i59 Tersam Sineh Fitter H.No. 3S-DD, Nansal 941 70803 53
i60 Sushil Kumar Fitter H.No. i O0-EE/DS, Nangal 9465762511
61 Kamal Dev Fitter H.No. 51-DD, Nangal 977976s6\6
62 Rakesh Kumar F itter H.No. 19-M, Nangal 98723 i 6855
163i
Sanleev Kumar Pump Operator VPO Raipur Sahore Teh & Distt'Ropar
941878204393t6492464
64 Inderjeet Cleaner H.No. 97,ward No.6 VPOSantoshgarh, Una (HP)
9816128400
65 Hariinder Singh T/Att. VPO Dehlan, Distt-Una (HP) 9805667473
66 Ram Saroop Chowkidar H.No. 387-G, Nangal 9878068483
167 Des Rai Store Attendant H.No. 63-DS/EE, Nangal 9815/2It/
68 Kamaliit Store Attendant H.No. 14-DS/EE, Nangal 991 5555 /9.
Prepared By
ASE-I
Issudd Bv
GH#A) -
BHAKRA BEASMANAGEMENT BOARD
Doc. No.BHD/DESIGN/EAP-Datez12-07-2019Issue No. 02
Page. 77 of 88
Page Revision No. 0
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
TITLE: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING, OUT OF HYDROLOGICAL
FAILURES, EARrH QU A "tt "88illlHrro
69 Ram Niwas Store Attendant H.No. 11-K/DC, Nangal 9569249430
70 Nirpal Singh Skilled Labour VPO Bathu, Una (HP) 98053412739816324628
71 Salinder Sineh Beldar H.No. 9-BB/BDS, Nangal 9876085489
72 Badri Lal Beldar VPO Mehatpur, Distt-Una(HP)
93 1 8657508
/) Ram Krishan Beldar VPO Kalitran, Teh nangal.
Distt-Ropar (PB)8146294180
74 Badri Parshad Beldar H.No.5l5-16-G, Nangal 98 1 597980 1
75 Vimal Beldar H.No. 15 BDS/Rly, Nansal 6283513612
76 Jagtar Singh Beldar H.No. 20-2llH, Nangal 977902rr688146824183
77 Kamla Parshad Beldar H.No. 21-BDS, Nangal 981s703407
78 Birbal Sineh Reldar H.No. 14-Y, Nangal 82t9483654
79 Shiv Kumar Sr. D ver H.No. 3-U/Dobbeta ColonY 6280562314
80 Hem Raj Sr. D ver H.No. 9-V, Nangal 9464292302
81 Rohit Chandel Sr. Driver Ishwer Kutir-1, RakkerColony, Una (HP)
9882426268
82 Bhuoinder Sineh Sr. Driver H.No. 130-J, Nangal 7081165607
83 Shiv Kumar Supervisor Vill-Basdera, Nangal 7986153089
84 Jagtar Singh Beldar VPO Nikku nangal., Nangal,Ropar (PB)
82t9460049
l-
85 Baldev Sineh Beldar Vill-Kanchera 6280617720
86 Jagtar Singh Reldar VPO Dukil, Nangal, Ropar(PB)
8421 137859
87 Ram Dass Beldar VPO Paroian, Una, Nangal 9459654955
88 Baldev Singh Beldar H.No. l9-AA/DC, Nangal 9s01 10355877 103 1 93 80
Prepared By
ASE-I
Reviewed and APProved BY
oi,.*tht{=ion
- lssled Bv i
Gh*r*o l
RHAKRA BEASMANAGEMENT BOARD
BHAKRA NANGAL PROJECTINTEGRATED MANAG EMENT SYSTEM
Doc. No.BHD/DESIGN/EAP-Date.l2-07-2019Issue No. 02
Page. 78 of 88Pase Revision No. 0
TITLE: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISTNG OUT OF HYDROLOGICAL
F A rLURE s, E ARrH Q u A* t Sohtlffied
-
&,^*ff-*t -f,-'"* BHAKITA rf,Lrpl.lsr'rg excl"{}\|lt{ifi r:rRrct-$n.r' {}.9}
Lli nl(i*ln!lfJ.t ilt.it*f ;,.i: rr.r:rirrv*.ir
,'..,. i hfir. r),,-r, tr-R *l.j :n',rsrai rinn, t{tttrr &r t}*s rgiaY
:3{144
I i<.r,rr .-r ,.u.,n, (r'\ Ax! rlu.\v I r I t.,\'t, t t
i ro*rttst a*6M t/'Y&As::+Ev Fr6rft,rt{D{ , t3*
I ,.r rilrl.!. qa.{{rtni..r r:.}};r*r _*S*& rfri, Itlt g,t.r{i{ X-? r{/tr-^
I :,!,ti :rirli:;:..r1:Li.? ir Lt?ii;itLr-vAr.q l)-Aiirltl .rrl1 _ ,' lr.rval0* Jf,-3\ {5u:rt,t,_trlTltqlriafr {:rs laf u r}il ! ()Lltntr&
, IaLrltt liAiil tri.f,Lt 0a1f!llai:!1r i.r< r,ot I *ar!,iri tiltla:(;{
,- ll)i.[E ii.1tsi lia]ilel F] I $nMlli]*l !rr II !all,rff {;t!r} et}i}& tFL[; t)as/irl{: {i{rlj]r alllJaf alatti t{}rtad atFt$rY^tlu
.nt :cL s ii r! lJ riL).)rr:1 {9} ii, S^.tll.Slt,:,1. . irr':r,--
i a*ttn aAi{lIaR *r r}0d trrr.Itl, I ', ,, ,llG,,I
IrP Ur uiLi (l ! iI tliar:k t*sr J{fp ca 04ill &tsH}
i (ritc! totr a,r,{} Lr*rr^{c:1 (:risd tar r,
: tJ,-- | rssi ta5
....., ,.__:... ,:L. .- - . ., ;...99.f;If o|*..6etor e!'166a le I'r/rr u. .iSit t P*wqH Psilr tP"t !6rtj5r!{3I7 ! P*Wtn FUilT PP: nrGHT/StrE
"":::: "R,|(
Annexure-XXIX (i)
v
Detail of staff taking observations in instrumentation sub division
il-r&' :''B'
. . *,1"-t ..
BHAKRA BEASMANAGEMENT BOARD
BTIAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02
Page. 79 of88Pase Revision No. 0
.TITLE: EMEIIGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL
FAILURES, EARTHQUAKES OR OTHERS.l^nnirnllprl
Sr.No.
Name ofObservation
Name ofObserver
Designation Address Contact No.
1 Plumb LineWell/DeflectionObservation
l. Bhupinder
Singh
Supervisor l7-J, Nangal 94t86675s2
2. DavinderKumar
W/Mistry Vill- Sukhsal 99rs686279
3. Narinder
Singh
-do- 27-I, Nangal 981.s504621
4. Chander
Mohan
Fitter l0-HH, Nangal 9815016804
5. Mohinder
Singh
Fitter 16-FIH, Nangal 94t8296616
6. BlinderSingh
Helper I2-DS/BB,Nangal
9882638401
7. Balwan
Singh
Beldar 343-FF, Nangal 9418976331
8. Jarnail Singh Beldar 103-G, Nangal 8427411044
2
Daily seepage
report of concretestructure
Observation
Same as abovesr. No. 1to 8
Same as above
sr. No. 1to 8
Same as above
sr. No. 1to 8Same as abovesr. No. lto 8
Ashok Kumar Supervisor 8-9-FF Nangal 9417 19 1 828
0. Dila Ram Driller 2-W Nangal 8894409121
-) Daily drain holes& UPPS
Observation
Same as abovesr. No. lto 8
Same as abovesr. No. lto 8
Same as abovesr. No. lto 8
Same as abovesr. No. lto 8
Prepared By
ASE-I
Reviewed and ApProved BY
Direc
BHAKRA BEASMANAGEMENT BOARD
BHAKRA NANGAL PROJECTTNTEGRATED MANAGEMENT SYSTEM
Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02Page. 80 of 88Pase Revision No. 0
TITLE: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL FAILURES,
E ARTHQUAKES oR ot"t,rntrolled
I s'.I xo.
Name ofObservation
Name ofC)bserver
Designation Address Contact No.
4 1) Crack
observation
2) Wet spot
observation
3) Joint Drain
& Formobservation
Same as above sr.
No. 1,2, 5
Same as above sr.No. 1,2,5
Same as above sr.
No. 1,2, 5
Same as above sr.
No. 1,2,5
5 Ground waterholes observation
1. HussanChand
Beldar 556-60-FF,Nangal
8968s88905
2. KashmirSingh
Beldar 448-FF, Nangal 783 I 890748
3. Jagpal Singh Beldar 246-FF, Nangal 8894685957
4. TarlochanDass
Beldar 142-FF, Nangal 98821,85957
UPP Dam Portion& Power Houses
Observation
1. Sameel deen Fitter 20-G, Nangal 9530553211
2. KashmirSingh
Fitter 30-O, Nangal 1831890748
3. JagjiwanSineh
Fitter 142-FF, Nangal 7837634676
4. Madan Lal Fitter 142-FF. Nangal 98t5t277415. TarlochanDass
Beldar 142-FF, Nangal 9816166s72
6. JagpalSineh
Beldar 142-FF, Nangal 9882146014
7. DeepakKumar
Beldar 142-FF, Nangal 9417740498
8. JarnailSinsh
Beldar 142-FF, Nangal 8427411044
"":::: "$ryReviewed and AonTved By
oirecto,#6tn
BHAKRA BEASMANAGEMENT BOARD
Doc. No.BTID/DESIGN/EAP-Date:12-07-2019Issue No. 02
Page. 8l of88Pase Revision No. 0
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYS'TEM
TITLE: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL
IFAILURES, EARTHQUAKES OR OTHERS.
[-.sr.I *o.t?
II
i
l-I
l
I
I
Prepared By
ASE.I
Y.
o.
Name ofObser-vation
Name ofObserver
Designation Address Contact No.
7 EmbeddedInstrument (Stress
Meters, joint Meters,Strin Meters)
1. BhupinderSineh
Supervisor l7-J, Nangal 9418667552
2. SurjitSineh
Beldar 431-G, Nangal 9592758885
3. JarnailSinqh
Beldar 103-G, Nangal 8427411044
4. BalwanSineh
Beldar 343-FF,Nangal
9418976337
8 Water TubeTitlmeters
Observation
1. BhupinderSingh
Supervisor i7-J, Nangal 9418667s52
9 Joint openingobservation
1. BhupinderSinsh
Supervisor 17-J, Nangal 9418667552
2. JarnailSineh
Beldar 103-G, Nangal 8427411044
t0 SMAs observation 1. JagtarSineh
JE 4-T Nangal 9464289665
I
I
BHAKRA BEASMANAGEMENT BOARD
BHAKRA NANGAL PROJECTTNTEGRATED MANAGEMENT SYSTEM
Doc. No.BHD/DESIGN/EAP-Date:12-07-2079Issue No. 02
Page. 82 of 88
Page Revision No. 0
TITLE: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL FAILURES,
EARTHeUAKES oo orr**Ot O[cd
Annexure-VI
Detail of all officers/officials working in permanent installation sub division,:dn'ra
Sr.No.
EmployeeNo.
Name & Designation Address Contact No.
292297 Mehar Singh, SDO Kohti No. 32, Nursery Square, Nangal 9465225304
2 2s1287 Surinder kumar, JE Quarter No. 19-S, Nangal T/ShiP 94785 1 9835
J 342997 Jagatdeep Singh, JE Quarter No, 12-GG 9803719784
4 248375 Bhupinder Singh, Foreman Quarter No. 23-T, Nangal. 9878795429
5 247709 Choudhary Ram, Foreman Vill-Dobar, PO Raipur Madian, TehBanasana, Distt.Una (HP)
9459594552
6 249788 Ramesh Chand, Chargeman V&PO Manakpur, Teh Nangal. 9463389688
7 282099 Kuldeep Singh, Chargeman Quarter No. 22-W , Nangal 9914754026
8 274481 Tilak Raj, Chargeman V&PO Kulgran, Teh-Nangal 9463522629
9 406547 Shiv Kumar, Supervisot,o&M
V&PO Ajouli, The& Distt.Una 9463026473
10 247531 Piara Singh, Er. Fitter Qr. No. S-GG, Nangal 9878333932
11 246651 Amrik Singh, E.St.St. V&PO Dobetta, Nangal T/ShiP 73473 1 61 88
t2 53sr49 Balram Singh, Carpenter Qr. No. 36-HH, Nangal 9465174022
13 328216 Surinder Kurnar, Welder Qr. No. g}-HH,Nangal T/shiP 9465354150
l4 238712 Jail Singh, CRO Qr. No. 116 Near,11-U, Dobetta 9876125348
15 246632 Mohan Lal, CRO Qr. No. 12-W-I, Nangal 9781404553
16 247876 Kuldeep Singh, CRO Qr. No. 1-2, Nangal T/shiP 9417468261
l7 247861 Sunil Kumar, CRO Qr. No. 2-Market, Nangal 9478158533
18 248265 Sucha Singh, CRO Qr. No. i0-Y, Nangal 9915372247
BBMB, Nangal
Reviewed and APrepared By
ASE-I
Ir *::[F*"]h,,yq.*J^/.
",,: ;.,-. :1._..
BHAKRA BEASMANAGEMENT BOARD
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02
Page. 83 of 88
Page Revision No. 0
TITLE: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL FAILURES,
-'irj . r. EARTHQUAKESOROTHERS.
r'r t It
Annexure-VI
Detail of all officers/officials working in permanent installation sub division,BBMB. Nansal
t
t
L
il
I
I
i
Prepared By
ASE-I
Reviewed and Approved BY
oi,*#".ign\
an
Sr.No.
EmployeeNo.
Name & Designation Address Contact No.
19 248252 Manjeet Kumar, CRO Qr. No. 4-O. Nangal 9041264561
20 249075 Chander Mohan, CRO Qr. No. 14-T, Nangal 9417743143
21 247599 Ashwani Kumar, CRO V&PO Santokhgarh, Teh & Distt. Una 98145 12915
22 247986 Kamar Deen, CRO Qr. No. 22-N, Nangal 98551 19558
2_1 247857 Dalieet Singh, CRO Qr. No. 23-K,Nangal 9464257614
24 246683 Parwaish Singh, CRO Vill- Hambewal, PO. Nikku Nangal 82639 20U+
25
;.1,O
249223 Ajay Kumar, CRO Qr. No. 87-88 FF, Nangal 946486U390
248409 Sanjeev Kumar, CRO Qr. No. 380-81-82-FF, Nangal 99t5923537
27 328021 Ramesh Kumar, CRO Qr. No. 285-G, Nangai 98 1 4080206
fs 249219 Yogesh Kumar, CRO V&PO. Bass, Distt. RoPar (PB.) 946310 1 057
ii 246736 Manjit Singh, MC. Opt. Qr. No. 10-U, Dobetta ColonY, Nangal 950 I 822308
30 249439 Dharam Paul, Driller Qr. No. 4-W, Dobetta ColonY, Nangal 9872605866
31 328053 Dhani Ram, Driller Qr. No. 51-H, Nangal T/shiP 73077 49861
)1- 249238 Arun Kumar, Fitter Qr. No. 14-G, Nangal 9463125u6U
aaJJ
34
328379 Gopal Dass, Fitter Qr. No. 22-E,, Nangal 964690 /OO /
328662 Yog Raj, Driller Qr. No. 113-DD, Nangal 7696985909
35
{6-
246702
2M121
Surinder Kumar, CE. Painter
gubu nunl, aE- Pr".rt.,
Qr. No. 22-D, Nangal
Qr. No. 5-llH, Nangal
66 / //65U6Y
q8 1 s06z5ag
BHAKRA BEASMANAGEMENT BOARD
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02Page. 84 of 88Page Revision No. 0
TITLE: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL FAILURES,
E ARTHA:AKE S OR''TTO.'O$CIT
Name & Designation Contact No.
9736915925248121 Rai Kumar, CE. Painter Qr. No. 137-H, Nangal
Sunil Dutt, CE. Painter Qr. No.518-FF, Nangal 9876248891
301 365 Ravinder Singh, CE. Painter Qr. No. 78-79-80-FF, Nangal 9779269399
Bhupinder Singh, T/Mate Qr. No. 3-L,Dobetta, Nangal 01881267622
9876949632249242 Satpal , SK/Labour Qr. No. 585-FF, Nangal
Kanshi parshad, Helper Qr. No. 301-G, Nangal 9041160985
09811462244247967 Vrjay Kumar, Helper V&PO- Raipur, Distt. Una (HP)
Vill-Hambewal, PO. Nangal., Distt- 8968978007327281 Bholi, Helper
7837028580248711 Ashok Kumar, Beldar Qr. No. 69-70-71,-FF, Nangal
8054045860Amarjit Singh, Beldar Qr. No. 480-81-G, Nangal
Harwant Singh, Beldar Qr. No. 27-28-29-JJ, Nangal 94t7281817
248758 Bal Krishan, Beldar Qr. No. 57-58-JJ, Nangal
9719220392248743 Hukam Chand, Beldar Qr. No. 137-G, Nangal
Jagdev Singh, Beldar Vill-Tupper, PO. Makri, Teh.NainaDevi Naneal
08988287249327774
9872885 868328182 Ramesh Kumar, Beldar Qr. No. 10-G, Nangal
Qr. No. 6-,4., Dobetta, Nangal 9855s74464328197 Kewal Singh, Beldar
9988 1 59613Mana Walam, Beldar Qr. No. 134-DSEE, Nangal
Vill-Thana, PO. Plassi, TehBasohli. Distt. Kathua (J&K
9196800s67Dharam Singh, Beldar
V&PO. Sabar, Teh. Basoli, Distt,kathua (J&K
8146728671Ajeet Singh, Beldar
9882s 12348328823 Manjeet Singh, Beldar Qr..No. 132-FF, Nangal
Vill-Choughat, PO. Paroian Una 9882426747334419 Ashwani Kumar, Beldar
Qr, No. 28-M, Nangal T/Ship 9463026764Mohan Lal, Carpenter
sETFlo(MR) ,----Reviewed and Approved By
Dirltor$esisn
Prepared By
ASE-I
Detail of all officers/officials working in permanent installationNansal
Annexure-VI
sub division, BBMB,
Doc. No.BHD/DESIGN/EAP.Date:12-07-2019Issue No. 02
Page. 85 of 88
Page Revision No. 0
BHAKRA NANGAL PROJECTTNTEGRATED MANAGEMENT SYSTEM
TITLE: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAT, FAII,URES,
' ' EARTHQUAKES oR o'U6iltto[ed
i-EI
I
l_={:+i'l
i1siE!r
1I
Il1;liliI
III
t-I
I
.-E€ilt i=;,f
='!-lI -a-"1-- ,: -A1-
1
I
1 ..a|--.* :t-'*a
6r-* {t;l.i
i}1zt
=t4lxt*l?
--lEri=
&gi:;E*
,.11., :,tr,
I]T]AKRA BEASMANAGEMENT BOARD
dd4
Yfft
.d::q utLrt q*.(,f:J ?
"{{}Fdffi<(j}{;}
-!k&l!rl@@
Reviewed and Approved BYPrepared By
ASE.I
Doc. No.BHDIDBSIGN/EAP-Date:12-07-2019Issue No. 02Page. 86 of88Page Revision No. 0
BHAI(RA NANGAL PITOJE CTINTEGRATED MANAGEMENT SYSTEM
TITLE: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL
FAILURES, EARTHQUAKES OR OTHE.RS.
;ontro[cd
" '_': ilin
BIIAKRA BEASMANAGEMENT
BOARD
Annexure-XXXll (i)
A Persons deployed at discharge sites Upstream Bhakra Dam on River Satluj
Sr.No
Name (S/Shri) Desg. Name of dischargesite
Contact No.
1 Basant Singh Work Mistry Kahu(Ghambar khad) 8219797372
2 Geeta Ram Beldar Kahu(Ghambar khad) 09736758622
3 Sharif Deen Gauge Reader Kahu(Ghambar khad) 0941 8431 898
4 Rajinder Shakya Wireless
Operator(Chargeman)
Berthin 9736457262
5 Madan Lal Gauge Reader Berthin 941 8849866
6 Suresh Kumar Helper Berthin 941 8369337
7 Sukhdev S/Attendent Daslehre (Berthin) 981 6380286
8 Sukhchain Gauge Reader Alikhed(Berthin) 9882076375
I Sarwan Kumar Gauge Reader Berthin 86280631 85
10 Hardyal Singh Wierless
Operator(chargeman)
Rampur(Nogli) 9418998147
11 Pardeep Kumar Gauge ReaderRampur (Nogli)
9418641412
12 Raj Kumar Boatman Rampur(Nogli) 7018491705
13 Shiv Kumar Gauge reader Rakchham(Rampur
Section)
98058821 37
14 Chander Prakash Gauge Reader Kalpa(Rampur
Section)
9418640471
15 Subhash Chander Gauge Reader Namgia (Rampur) 9418402605
16 Takpa Lotey Gauge Reader Kaza (Rampur
Section)
945931 3758
''":::: "ffK Reviewed and Agproved BY
oiredF#s,gn
':.:.:l'...::: '
BHAKRA BEASMANAGEMENT
BOARD-J
B Persons deployed at discharge sites d/s Bhakra
at RD 4000 ft & 175000 on NHC
TITLE: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL
FATLURES, EARr H eu A KES oR^oqtlEdwe0.*rCU
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02Page. 87 of88Page Revision No. 0
Annexure-XXXll (ii)
Dam i.e. at Olinda on River Sutlej and
il-No.
Name (S/Shri) Desg. Name of discharge
site
Contact No.
1 Narinder Kumar Gauge Reader Olinda 9872961 353
-g4782632062 Kuldeep Kumar -do- Olinda
Tarsem Lal -do- Olinda 98 1 665676 /
4 Satpal Boatman Olinda 98761551 15
A Malkiat Singh Supervisor R. D.1 75000 9417 1-57 525
o Nirmal Singh Boatman R. D.1 75000 98764-63386
-eB7A-9912277 Roshan Lal Sunder Attendant R. D.1 75000
Lal Singh Gauge Reader R. D.1 75000 94170- I 1356
o Permjit Singh -do- R D 175000 9417 1 -57 072
10 Rakesh Kumar -do- R.D.175000 9441252404
11 Jagir Singh -do- R D 175000 94b309144 t
12 Yeogesh Kumar -do- R. D.1 75000 76961 87634
13
14-
Surinder Singh
Kdhan-Chara--
-do-
-Oo-
R.D 175000 987642504t)
gaos t zao45 -
C. Discharge Site at RD 4(
Sr. -frlamt(s/stro
)00 of NHC
Contact No.
Suresh Kumar
Vinod Kumar
Harish Kumar
Desg. Name of discharge
site
Gauge Reader 9878274925
Gauge Reader 9876781447
Boatman RD 4000 of NHC 9888897356
Gauge Reader 9467736684
Gauge Reader 9805620925Jagan Nath
BHAKRA BEASMANAGEMENT
BOARD
BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM
TITLE: EMERGENCY ACTION PLANFORI{ANDLING SITUATION ARISING OU.T OTHYDROLOGICAL FAILURES, EARTHQUAKES OR
r'Doc. No.BHD/DBSIGN/EAP-Date:12-07-2019Issue No. 02Page. 88 of88Page Revision No. 0
B
o
'i0
Annexure-XXXlt (iii)
LIST OF EMOPLOYEES OF EtectricatSUB D|VIS|ON BHAKRA
9465 1 66050
9878931 816
9478388569
9569237005
9418445579Sukhwinder Pat
Sukhwinder Kumai
Harbail Singh
ASE-I
9464966723
9417075666
99884398,1 1
- Prepaieo@-t-l
I
I
i
i
Reviewed and AppAoved By
Designation.Ramesh Kumar
9417773829
9417281363Lachhman Dass
9418780128Jatinder Singh
Ra1 Kumar
Darshan Singh Elect.G.-l
Shamser Singh
Avtar Singh
Vijay Kumar
Dhian Singh
Malkiat Chand
Elect.G.-l
Elect.G.-ll
EIect.G.-ll
Fitter.