SAKLAR SEKSI OTOMATIS ( SSO )AUTOMATIC CIRCUIT SECTIONALISERSAKLAR YANG DILENGKAPI DENGAN KONTROL ELEKTRONIK ,YANG DIGUNAKAN SEBAGAI PENGAMAN SEKSI, DAN BEKERJANYA BERKAITAN DENGAN PENGAMAN DISISI SUMBER ( SEPERTI RELAI RECLOSER ATAU PBO ) .
MENGISOLIR SEKSI SUTM YANG TERGANGGU SECARA OTOMATIS .
BILA TIDAK ADA RELAI RECLOSER ATAU PBO DISISI SUMBER MAKA SSO TIDAK BERFUNGSI OTOMATIS ( SEBAGAI SAKLAR BIASA ).
IBA DOC
IBA DOCKLASIFKASI SSO MENURUT PENGINDRAAN : 1. PENGINDRA TEGANGAN ( AUTOMATIC VACCUM CIRUIT ) 2, PENGINDRA ARUS ( AUTOMATIC CIRCUIT RECLOSER )
MEDIA PEMUTUS : 1. MINYAK 2. VACCUM 3. GAS SF6
KONTROL : 1. HIDRAULIK 2. ELEKTRONIK
FASA : 1. FASA TUNGGAL 2. FASA TIGA .
IBA DOCAPLIKASISISTEM DISTRIBUSI TM POLA 1 (PENTANAHAN NETRAL R TINGGI) .SSO 1SSO 2TTPCTPCTPOWERCONTROLTRANSFORMERKOTAK PENGATURCONTROL DEVICEPMTAVS 1AVS 2SEKSI 1SEKSI 2SEKSI 3FOCRDGFRRECLOSERR># SEBAGAI ALAT PEMUTUS OTOMATIS UNTUK MEMISAHKAN SALURAN UTAMA DALAM BEBERAPA SEKSI AGAR DAERAH YANG TERGANGGU SEKECIL MUNGKIN .# MAMPU MENUTUP PADA SAAT GANGGUAN DAN MEMBUKA / MENUTUP DALAM KEADAAN BERBEBAN .# BEKERJA BERDASARKAN PENGIDRA TEGANGAN .
IBA DOCPRINSIP OPERASI AVS SETTING WAKTU :
t1 = selang waktu sso bertegangan sampai menutup kontak ( close ) t2 = selang waktu SSO merasakan tegangan sampai trip (< t2 akan lockout ) t3 = selang waktu SSO tidak bertegangan sampai membuka kontak ( trip )
IBA DOCPRINSIP OPERASI AVSGANGGUAN DI SEKSI 3 :
1. Relai kerja , PMT trip , tegangan sistem hilang maka setelah t3 SSO akan trip . 2. setelah waktu interval reclose , recloser di hulu akan memerintahkan PMT reclose pertama . 3. Seksi 1 akan bertegangan , setelah t1 SSO1 close seksi 2 bertegangan , setelah t1 SSO2 masuk . 4. Bila gangguan hilang sistem akan normal . 5. Bila gangguan masih , relai kerja , PMT trip, setelah t3 kedua SSO trip. 6. SSO2 merasakan tegangan < t2 maka SSO2 lockout . 7. Setelah waktu interval reclose ,recloser memerintahkan masuk ( reclose ke 2 ) . 8. Seksi 1 bertegangan ,setelah t1 SSO1 close . 9. Seksi 2 bertegangan, dan 10. Seksi 3 diisolir oleh SSO2 .
IBA DOC POLA 2
SISTEM PENTANAHAN SOLID GROUNDEDSSOSSOPMTOCRGFRPBOPLPL# MELOKALISIR GANGGUAN DALAM SEKSI SEKSI YANG LEBIH KECIL# BEKERJA BERDASARKAN PENGINDRA ARUS ( ARUS HUBUNG SINGKAT )# MEMBUKA DAN LOCKOUT PADA SAAT RANGKAIAN TIDAK BERTEGANGAN . # MEMPUNYAI HITUNGAN UNTUK MEMBUKA( COUNT TO OPEN ) TERGANTUNG DARI PBO DI SISI SUMBER .
IBA DOCSENSINGBCTsMATCHINGTRANSFOCOUNTINGRELAYCOUNTINGCIRCUIT MEMORYCIRCUITFIRINGCIRCUITTRIPCOILTRIPSTORAGECAPASITORCOUNTINGCAPASITORINRUSHLOGICTIME DELAYRAISEDLEVELNETWORKVOLTAGERESTRAINTSOURCEVOLTAGERECTIFIERNETWORK806405101520304590BLOCK2 4 6 8PRINSIP KERJA SSO KONTROL ELEKTRONIM PENGINDRA ARUS
IBA DOCPRINSIP KERJA SSO KONTROL ELEKTRONIK# Arus di jaringan di deteksi oleh cCT Bushing , kemudian melalui Matching Tranformer dan Rectifier disearahkan dan disimpan dalam Trip Storage Capasitor untuk Triping .# Apabila I > dari arus kerja ( 125% arus kerja ) , Counting relay akan mengisi Counting Capasitor .# Apabila PBO di hulu trip , atau I < 50% arus kerja , Counting Capasitor akan mengisi Counting Circuit ,terjadi penghitungan# Jika hitungan sudah mencapai setting hitunganuntuk membuka maka isyarat akan dikirim ke Firing Circuit .# Trip Storage Capasitor memberikan arus ke trip coil ( Bestable Actuator ) SSO akan open dan lockout .# Tegangan Restraint ( Restraint Voltage ) Bila tegangan tidak diputus , I > lewat SSO , I < 50% arus kerja, maka restraint Voltage akan mencegah Counting Circuit untuk melakukan hitungan .# Restraint Inrush juga mencegah SSO dari penghitungan untuk Trip .
IBA DOCOPERASI MEKANIK SSO# Kondisi kontak ditutup ( gambar 1.6a ) pegas Opening dipertahankan energis, untuk operasi trip .# Signal trip mengerjakan Tripping Coil ( Bestable actuator ) mengerjakan trip lever , untuk membebaskan Toglelatch menyebabkan kontak open ( gambar 1.6b)# Closing Full ring memutar rachet dan Crak searah jarum jam menegangkan kedua pegas ( spring Closing / Opening ) gambar 1.6c# Gerakan lengan Crank merentangkan tigle sampai terkunci dan menarik mekanis untuk menutup kontak .# Dapat juga menggunakan motor untuk menegangkan pegas ( motor operated ) .
IBA DOCSETTING SSO TIPE MC GRAW EDISONGN3VE1, ARUS KERJA MINIMUM ( Operating Minimum Current )
HITUNGAN UNTUK MEMBUKA ( Count to Open )
PENAHAN ARUS INRUSH ( Inrush Current Restraint )
ARUS KERJA MINIMUM GANGGUANFASA / GROUND :
HITUNGAN UNTUK MEMBUKA( COUNT TO OPEN ) : N 1 ( N ) = JUMLAH TRIP SAMPAI LOCKOUT .Count to open setting 1 ; 2 ; 3 .Ground Actuating current resistorPhase Actuating Current resistorSetting for phaseActuating Current multiplierSetting for durationOf ground current sensing blockSetting for durationOf raised phaseCurrent sensing
IBA DOCSETTING SSO TIPE MC GRAW EDISONGN3VE
ARUS KERJA MINIMUM GANGGUANFASA / GROUND :
HITUNGAN UNTUK MEMBUKA( COUNT TO OPEN ) : N 1 ( N ) = JUMLAH TRIP SAMPAI LOCKOUT .
PENAHAN ARUS INRUSH :
SIFAT PENAHAN ARUS INRUSH DALAH MENAIKAN LEVELKERJA FASA MINIMUM DARI SSO DENGAN PENGALI X ( 2 ; 4 ; 6 ; 8 KALI )
ATAU MEMBLOK DETEKSI ARUS LEBIH UNTUK PERIODE : Y ( 5 ; 10 ; 15 ; 20 CYCLE ) BILA SIRKUIT LOGIK MENENTUKAN BAHWA ARUS LEBIH ADALAH ARUS INRUSH .
DALAM WAKTU YANG SAMA DETEKSI ARUS LEBIH GANGGUAN TANAH DIBLOK SAMA SEKALI UNTUK PERIODE Z ( 0,3 ; 0,7 ; 1,5 ; 3 ; 5 DETIK )PEMILIHAN X , Y , DAN Z DENGAN MEMINDAHKAN KABEL JUMPER .
IBA DOCPENGUJIAN SSO PENGUJIAN INDIVIDUAL DARI SSO DAPAT DILAKUKAN DENGAN INJEKSI PRIMER / SEKUNDER .
JENIS PENGUJIAN :
1. ARUS KERJA MINIMUM : FASA / GROUND
2. HITUNGAN UNTUK MEMBUKA ( COUNT TO OPEN )
3. PENAHAN ARUS INRUSH ( INRUSH CURRENT RESTRAINT )
IBA DOCSVacCT 500/5ATANK AMPRANGKAIAN PENGUJIAN SSODENGAN INJEKSI PRIMERSSO MC GRAW EDISONGN3VEmA
IBA DOCPROSEDUR PENGUJIAN Arus Kerja Minimum gangguan Fasa. 1. Blok sirkuit perasa gangguan tanah ( lepas dan hubung singkat plug ground . 2. Setel SSO untuk satu hitungan untuk membuka dengan memasang kabel jumper pada terminal nomer 1 . 3. Masukan SSO dengan menekan handel warna kuning . 4. Naikan arus uji kira kira 80% dari arus kerja 5. matikan alat uji SSO tidak membuka 6. Hidupkan alat uji dan naikan arus uji110% dari arus kerja 7. SSO akan menghitung dan membuka . 8. Ulangi butir 3 s/d 7 untuk fasa B dan C 9. Lepas penghubung singkat dan pasang kembali plug ground
IBA DOCPROSEDUR PENGUJIAN Arus kerja minimum gangguan fasa ke tanah 1. Pasang plug fasa dan tanah ( set fasa lebih besar dari tanah ) 2. Periksa bahwa SSO diset pada satu hitungan untuk membuka 3. Masukan SSO 4. Uji fasa A ,naikan arus uji kira kira 80% arus kerja minimum 5. Matikan alat uji ( arus menjadi nol ) SSO tidak bekerja 6. Hidupkan alat uji ,dan naikan arus 110% arus kerja 7. Matikan alat uji , SSO akan membuka . 8. Ulangi butir 3 s/d 7 untuk fasa B dan C . Menguji jumlah hitungan untuk membuka 1. Set hitungan untuki membuka dari SSO ( misal 2 atau 3 ). 2. Masukan SSO 3. Uji fasa A dengan arus kira kira 150% dari arus kerja minimum 4. Matikan / hidupkan alat uji dengan menutup / membuka salar S sebanyak setting hitungan untuk membuka . Maka SSO akan membuka dan lockout .
IBA DOCCONTROLLOGICSENSINGCIRCUITCHARGEPROTECTIONCRCUITCHARGING CTsTRIPCOILK2K3K3K21211CP1CP2CP3C20C21C40C41C60C61126510943871211C22C23C42C43C62C63C20C21C40C41C60C611S21S11S11S11S21S21S21S11S21S11S11S2S1S2S2S1S1S2C11C10C30C31C51C50C11C31C51C70CONTROL UNIT PCBSECTIONALISER CONTROL UNITPROTECTIONCTsSSO TIPE BRUSH
IBA DOCSW 7SW 8SW 9SW 3SW 2SW 1SW 5SW 6SW 4KONTROL ELEKTRONIKTEMPAT KABEL CTARUS KERJA MINIMUM FASADAPAT DISETEL KE TIGA FASANYA DENGAN RENTANGSETELAN 10 A S/D 630A DENGAN STEP 10A LIHATTABEL .SW1 & SW6 UNTUK FASA RSW2 & SW5 UNTUK FASA SSW3 & SW4 UNTUK FASA T
SW9 UNTUK SETTING GROUND
SW8 UNTUK SETTING COUNT TO OPEN DAN ENABLE/ DISABLE PROTEKSI GROUND
SW7 UNTUK SETTING RESET TIMESETTING SSOTIPE BRUSH
IBA DOCPOSISI SW1 & SW6 UNTUK SETTING ARUS KERJA MINIMUM FASA R
IBA DOCPOSISI SW2 & SW5 UNTUK FASA S SERTA SW3 & SW4 UNTUK FASA T ADALAH SAMA DENGAN POSISI SW1 & SW6 .
IBA DOCPOSISI SW9 UNTUK SETTING ARUS KERJA MINIMUM GANGGUAN TANAH
IBA DOC
IBA DOC1. PROTEKSI GANGGUAN TANAH POSISIKAN SW8.4 SEBAGAI BERIKUT : SW8.4 ENABLE OFFDISABLE ON 2. JUMLAH GANGGUAN YANG MENYEBABKAN LOCKOUT JUMLAH GANGGUAN SW8.1 SW8.2 SW8.3 1 ON - - 2 - ON - 3 - - ONRECLAIM TIME SW7.1 SW7.2 SW7.3 SW7.4 ( DETIK ) 15 ON 30 ON 60 ON 120 ON
IBA DOCTRIPCOILCONTROLLOGICSENSINGCIRCUITCHARGEPROTECTIONCRCUITK3K21211CP1CP2CP3C20C21C40C41C60C61126510943871211C22C23C42C43C62C63C20C21C40C41C60C61C11C10C30C31C51C50C11C31C51C70CONTROL UNIT PCBSECTIONALISER CONTROL UNITARVARIACVac10A30VacPENGUJIAN INJEKSISEKUNDER DARI SSO
IBA DOCPROSEDUR PENGUJIAN INJEKSI SEKUNDERLepaskan hubungan ke blok terminal dalam panel kontrol .
Hubungkan catu daya bolak balik 30 V ke salah satu dari pasangan C20 dan C21 ,C40 dan C41 atau C60 dan C61 seperti gambar .
Hubungkan sumber arus bolak balik ( variac dan tahanan seri ) ke C71 dan ke salah satu C11 atau C31 , C51 seperti gambar karena rasio ct proteksi 64 : 1,maka arus injeksi sama dengan sama dengan arus gangguan ( sisi primer )
Jika menguji proteksi fasa , proteksi tanah dimatikan ( disable ) Untuk menguji gangguan tanah maka proteksi tanah harus dalam posisi enable . Pastikan bahwa arus kerja fasa harus lebih besar dari setting gangguan tanah .
Atur besarnya arus uji dan setelah itu matikan alat uji maka SSO akan trip dan lockout .(set count to open 1 )
IBA DOCBYPASS SWITCHDISCONNECT SWITCHDISCONNECT SWITCHSURGEARRESTERSURGEARRESTERSECTIONALISERPRINSIP PEMASANGAN