Post on 28-Mar-2015
NO PEKERJAAN
1 PEKERJAAN PERSIAPAN Rp 506.428
2 PEKERJAAN PONDASI Rp 29.733.772
3 PEKERJAAN BETON Rp 245.647.845
4 PEKERJAAN DINDING DAN PLESTERAN Rp 76.648.009
5 PEKERJAAN PINTU DAN JENDELA Rp 16.550.000
6 PEKERJAAN PERATAPAN Rp 46.265.854
7 PEKERJAAN LANTAI Rp 27.252.976
8 PEKERJAAN INSTALASI LISTRIK Rp 2.219.875
9 PEKERJAAN INSTALASI AIR Rp 10.388.050
10 PEKERJAAN KUNCI DAN ENGSEL Rp 2.478.800
11 PEKERJAAN FINISHING Rp 10.450.931
JUMLAH Rp 468.142.539
IZIN BANGUNAN 1% Rp 4681425,392
PPN 10 % Rp 46814253,92
TOTAL Rp 519.638.218
HARGA PEKERJAAN
TABEL 4. REKAPITULASI