Rekap HM Alat Berat

Post on 30-Oct-2015

1.131 views 188 download

Transcript of Rekap HM Alat Berat

7/16/2019 Rekap HM Alat Berat

http://slidepdf.com/reader/full/rekap-hm-alat-berat 1/11

NAMA OPERATOR : Sabiran

NIA : BDZ01

JENIS ALAT : Buldozer 

MERK : D31A

PERIODE : 22 Maret 12 s/d 29 Maret 2012

AWAL AKHIR TOTAL

22-Mar-12 - 10 10 

23-Mar-12 10 20 10 

24-Mar-12 20 27 7 

25-Mar-12 27 35 8 

26-Mar-12 35 35 - 

27-Mar-12 35 42 7 

28-Mar-12 42 47 5 

29-Mar-12 47 52 5 

30-Mar-12 52 52 - 

31-Mar-12 52 52 - 

1-Apr-12 52 59 7 2-Apr-12 - 

3-Apr-12 - - 

4-Apr-12 - - 

5-Apr-12 - - 

6-Apr-12 - - 

7-Apr-12 - - 

8-Apr-12 - - 

9-Apr-12 - - 

10-Apr-12 - - 

11-Apr-12 - - 

12-Apr-12 - - 

- - 

59 

Brakit, 31 Maret 2012

Dilaporkan oleh,

Supri

TOTAL HM

Disetujui Oleh,

REKAPITULASI PEKERJAAN ALAT BERAT

Buldozer D31 (PPHT)

TANGGALHM

AKTIVITAS

Layani dumptruck di dermaga

Layani dumptruck di dermaga

Service jalan ATK - km1

Layani dumptruck di dermaga

Layani dumptruck di dermaga

Layani dumptruck di dermaga

Layani dumptruck di dermaga

Layani dumptruck di dermaga

Service dermaga

Cecep Suganda

KETERANGAN

Diperiksa oleh,

Hendra Ningrat

7/16/2019 Rekap HM Alat Berat

http://slidepdf.com/reader/full/rekap-hm-alat-berat 2/11

NAMA OPERATOR : Anton

NIA :

JENIS ALAT : Exc 01

MERK : Exa 340

PERIODE : 16 Maret 12 s/d 25 April 2012

PRODUKSI :

AWAL AKHIR TOTAL Hi Shi Sbi

16-Mar-12 8,675 8,675 - 

17-Mar-12 8,675 8,684 9 Produksi batu 250 250 

18-Mar-12 8,684 8,684 - 250 

19-Mar-12 8,684 8,694 10 Produksi batu 200 450 

20-Mar-12 8,694 8,704 10 Produksi batu 200 650 

21-Mar-12 8,704 8,704 - 650 

22-Mar-12 8,704 8,724 20 Produksi batu 200 850 

23-Mar-12 8,724 8,734 10 Produksi batu 200 1,050 

24-Mar-12 8,734 8,745 11 Produksi batu 200 1,250 

25-Mar-12 8,745 8,765 20 Produksi batu 200 1,450 

26-Mar-12 8,765 8,765 - 1,450 27-Mar-12 8,765 8,775 10 Produksi batu 200 1,650 

28-Mar-12 8,775 8,775 - 1,650 

29-Mar-12 8,775 8,775 - 1,650 

30-Mar-12 8,775 8,775 - 1,650 

31-Mar-12 8,775 8,775 - 1,650 

1-Apr-12 8,775 8,775 - 1,650 

2-Apr-12 8,775 8,775 - 1,650 

3-Apr-12 8,775 8,775 - 1,650 

4-Apr-12 8,775 8,775 - 1,650 

5-Apr-12 8,775 8,775 - 1,650 

6-Apr-12 8,775 8,775 - 1,650 

7-Apr-12 8,775 8,775 - 1,650 

8-Apr-12 8,775 8,775 - 1,650 

9-Apr-12 8,775 8,782 7 Produksi batu 200 1,850 10-Apr-12 8,782 8,791 9 Produksi batu 200 2,050 

11-Apr-12 8,791 8,801 10 Produksi batu 200 2,250 

12-Apr-12 8,801 8,801 - 2,250 

13-Apr-12 8,801 8,810 9 Produksi batu 200 2,450 

14-Apr-12 8,810 8,810 - 2,450 

15-Apr-12 8,810 8,821 11 Produksi batu 180 2,630 

16-Apr-12 8,821 8,821 - 2,630 

17-Apr-12 8,821 8,821 - 2,630 

18-Apr-12 8,821 8,830 9 Produksi batu 150 2,780 

19-Apr-12 8,830 8,838 8 Produksi batu 300 3,080 

20-Apr-12 8,838 8,838 - 3,080 

21-Apr-12 8,838 8,858 20 Produksi batu 300 3,380 

22-Apr-12 8,858 8,869 11 Produksi batu 200 3,580 

23-Apr-12 8,869 8,869 - 3,580 

24-Apr-12 8,869 8,880 11 Produksi batu 200 3,780 25-Apr-12 8,880 3,780 

- 3,780 

- 3,780 

- 3,780 

- 3,780 

- 3,780 

- - 3,780 

205 3,780TOTAL HM

REKAPITULASI PEKERJAAN ALAT BERAT

CV Haruman

TANGGALHM

KETERAKTIVITASBBM

Produksi

7/16/2019 Rekap HM Alat Berat

http://slidepdf.com/reader/full/rekap-hm-alat-berat 3/11

Average 18 Ltr/Jam

Brakit, 31 Maret 2

26-Apr-12 8,880 8,888 8 200 

27-Apr-12 8,888 8,897 9 Produksi batu 300 500 

28-Apr-12 8,897 8,897 - 500 

29-Apr-12 8,897 8,897 - Produksi batu 500 

30-Apr-12 8,897 8,927 30 Produksi batu 300 800 

1-May-12 8,927 8,927 - 800 

2-May-12 8,927 8,948 21 Produksi batu 220 1,020 3-May-12 8,948 8,958 10 Produksi batu 200 1,220 

4-May-12 8,958 8,967 9 Produksi batu 200 1,420 

5-May-12 8,967 8,967 - Produksi batu 1,420 

6-May-12 8,967 8,982 15 200 1,620 

7-May-12 8,982 8,989 7 Produksi batu 200 1,820 

8-May-12 8,989 8,989 - 1,820 

9-May-12 8,989 9,002 13 200 2,020 

10-May-12 2,020 

11-May-12 9,002 9,015 13 200 2,220 

12-May-12 - 200 2,420 

13-May-12 9,015 9,027 12 200 2,620 

14-May-12 9,027 9,032 5 200 2,820 

15-May-12 - 2,820 

16-May-12 9,032 9,042 10 200 3,020 

17-May-12 - 3,020 18-May-12 9,042 9,054 12 260 3,280 

19-May-12 9,054 9,063 9 250 3,530 

20-May-12 9,063 9,071 8 Produksi batu 250 3,780 

21-May-12 - Produksi batu 3,780 

22-May-12 9,071 9,085 14 Produksi batu 250 4,030 

23-May-12 4,030 

24-May-12 - Produksi batu 4,030 

- 4,030 

- Produksi batu 4,030 

- 4,030 

- 4,030 

- Produksi batu 4,030 

- Produksi batu 4,030 

- 4,030 - Produksi batu 4,030 

- Produksi batu 4,030 

- 4,030 

- Produksi batu 4,030 

4,030 

- 4,030 

- 4,030 

- 4,030 

- 4,030 

- 4,030 

- - 4,030 

205 2,820

 

TOTAL HM

7/16/2019 Rekap HM Alat Berat

http://slidepdf.com/reader/full/rekap-hm-alat-berat 4/11

NGAN

7/16/2019 Rekap HM Alat Berat

http://slidepdf.com/reader/full/rekap-hm-alat-berat 5/11

12

16.70

7/16/2019 Rekap HM Alat Berat

http://slidepdf.com/reader/full/rekap-hm-alat-berat 6/11

NAMA OPERATOR : Kris

NIA :

JENIS ALAT : Exc 02

MERK : Exa 340

PERIODE : 16 Maret 12 s/d 25 April 2012

PRODUKSI :

AWAL AKHIR TOTAL Hi Shi Sbi

16-Mar-12 6,080 6,080 - 

17-Mar-12 6,080 6,086 6 Produksi batu 150 150 

18-Mar-12 6,086 6,096 10 Produksi batu 200 350 

19-Mar-12 6,096 6,105 9 Produksi batu 200 550 

20-Mar-12 6,105 6,114 9 Produksi batu 200 750 

21-Mar-12 6,114 6,123 9 200 950 

22-Mar-12 6,123 6,132 9 Produksi batu 200 1,150 

23-Mar-12 6,132 6,142 10 Produksi batu 200 1,350 

24-Mar-12 6,142 6,152 10 Produksi batu 200 1,550 

25-Mar-12 6,152 6,162 10 Produksi batu 200 1,750 

26-Mar-12 6,162 6,162 - 1,750 

27-Mar-12 6,162 6,162 - Produksi batu 200 1,950 28-Mar-12 6,162 1,950 

29-Mar-12 - - 1,950 

30-Mar-12 - - 1,950 

31-Mar-12 - - 1,950 

1-Apr-12 - - 1,950 

2-Apr-12 - - 1,950 

3-Apr-12 - - 1,950 

4-Apr-12 - - 1,950 

5-Apr-12 - - 1,950 

6-Apr-12 - - 1,950 

7-Apr-12 - - 1,950 

8-Apr-12 - - 1,950 

9-Apr-12 6,162 6,168 6 Produksi batu 200 2,150 

10-Apr-12 6,168 6,183 15 Produksi batu 200 2,350 

11-Apr-12 6,183 6,183 - Produksi batu 2,350 

12-Apr-12 6,183 6,191 8 150 2,500 

13-Apr-12 6,191 6,191 - Produksi batu 2,500 

14-Apr-12 6,191 2,500 

15-Apr-12 - - Produksi batu 2,500 

16-Apr-12 - - 2,500 

17-Apr-12 - - 2,500 

18-Apr-12 - - Produksi batu 2,500 

19-Apr-12 - - Produksi batu 2,500 

20-Apr-12 - - 2,500 

21-Apr-12 - - Produksi batu 2,500 

22-Apr-12 - - Produksi batu 2,500 

23-Apr-12 - - 2,500 

24-Apr-12 - - Produksi batu 2,500 

25-Apr-12 - 2,500 

26-Apr-12 - 2,500 

27-Apr-12 - 2,500 28-Apr-12 6,191 6,199 200 2,700 

29-Apr-12 6,199 6,209 200 2,900 

30-Apr-12 6,209 2,900 

6,209 6,209 2,900 

111 ####

Average 26 Ltr/Jam

Brakit, 31 Maret 2012

Dilaporkan oleh,

Supri

26-Apr-12 - - 

Cecep Suganda Hendra Ningrat

TOTAL HM 26 

Disetujui Oleh, Diperiksa oleh,

REKAPITULASI PEKERJAAN ALAT BERAT

PT Haruman Jaya Lestari

TANGGALHM

AKTIVITASBBM

Produksi KETERANGAN

7/16/2019 Rekap HM Alat Berat

http://slidepdf.com/reader/full/rekap-hm-alat-berat 7/11

27-Apr-12 - - 

28-Apr-12 - 6,199 200 200 

29-Apr-12 6,199 6,209 10 200 400 

30-Apr-12 6,209 6,209 - 400 

1-May-12 6,209 6,227 18 200 600 

2-May-12 6,227 6,227 - 600 

3-May-12 6,227 6,245 18 300 900 

4-May-12 6,227 6,245 18 900 

5-May-12 6,245 6,245 - 900 

6-May-12 6,245 6,270 25 200 1,100 7-May-12 6,245 6,278 33 200 1,300 

8-May-12 6,278 6,278 1,300 

9-May-12 6,278 6,293 15 300 1,600 

10-May-12 - 1,600 

11-May-12 6,293 6,309 16 300 1,900 

12-May-12 - - 1,900 

13-May-12 6,309 6,326 17 300 2,200 

14-May-12 6,326 6,336 10 300 2,500 

15-May-12 6,326 (6,326) 2,500 

16-May-12 6,336 6,349 13 250 2,750 

17-May-12 6,349 6,357 8 300 3,050 

18-May-12 6,349 (6,349) 3,050 

19-May-12 6,357 6,376 19 300 3,350 

20-May-12 6,376 6,383 7 300 3,650 21-May-12 6,376 (6,376) 3,650 

22-May-12 6,383 (6,383) 3,650 

23-May-12 - - 3,650 

24-May-12 - - 3,650 

25-May-12 - - 3,650 

- - 

- - 

- - 

- - 

- - 

- - 

- - 

- - 

- - 

- - 

- - 

- - 

- - 

- - 

- - 

- - 

- - 

(25,207) ####TOTAL HM (0) 

7/16/2019 Rekap HM Alat Berat

http://slidepdf.com/reader/full/rekap-hm-alat-berat 8/11

NAMA OPERATOR : Misran

NIA :

JENIS ALAT : Excavator 

MERK : Exa 220

PERIODE : 22 Maret 12 s/d 29 Maret 2012

AWAL AKHIR TOTAL

22-Mar-12 - 7 7 

23-Mar-12 7 - 

24-Mar-12 - - 

25-Mar-12 - - 

26-Mar-12 - - 

27-Mar-12 - - 

28-Mar-12 - - 

29-Mar-12 - - 

30-Mar-12

- - 

7

Brakit, 31 Maret 2012

Dilaporkan oleh,

SupriCecep Suganda Hendra Ningrat

TOTAL HM

Disetujui Oleh, Diperiksa oleh,

Service jalan dermaga

Service jalan dermaga

Service jalan dermaga

Minggu / libur 

Service jalan dermaga

Muat batu di dermaga

Muat batu di dermaga + service jalan dermaga

Muat batu

REKAPITULASI PEKERJAAN ALAT BERAT

Excavator 220 (ATK)

TANGGALHM

AKTIVITAS KETERANGAN

7/16/2019 Rekap HM Alat Berat

http://slidepdf.com/reader/full/rekap-hm-alat-berat 9/11

NAMA OPERATOR : Octo

NIA :

JENIS ALAT : Excavator 

MERK : Exa 220

PERIODE : 22 Maret 12 s/d 29 Maret 2012

AWAL AKHIR TOTAL

22-Mar-12 - 10 10 

23-Mar-12 10 20 10 

24-Mar-12 20 30 10 

25-Mar-12 30 38 8 

26-Mar-12 38 38 - 

27-Mar-12 38 46 8 

28-Mar-12 46 51 5 

29-Mar-12 51 56 5 

30-Mar-12 56 56 - 

31-Mar-12 56 56 - 

1-Apr-12 56 62 6 2-Apr-12 62 62 - 

3-Apr-12 62 62 - 

4-Apr-12 62 68 6 

5-Apr-12 68 68 - 

6-Apr-12 68 72 4 

7-Apr-12

- - 

72

Brakit, 31 Maret 2012

Dilaporkan oleh,

Supri

REKAPITULASI PEKERJAAN ALAT BERAT

Excavator 220 (ATK)

TANGGALHM

AKTIVITAS KETERANGAN

Muat batu di dermaga

Muat batu di dermaga + service jalan dermaga

Muat batu

Service jalan dermaga

Minggu / libur 

Service jalan dermaga

Service jalan dermaga

Service jalan dermaga

Service jalan dermaga

loading batu

Service jalan dermaga

Diperiksa oleh,

Cecep Suganda Hendra Ningrat

TOTAL HM

Disetujui Oleh,

7/16/2019 Rekap HM Alat Berat

http://slidepdf.com/reader/full/rekap-hm-alat-berat 10/11

NAMA OPERATOR : BowoNIA : Ece 03

JENIS ALAT : Excavator 

MERK : Hitachi 210LC

PERIODE : 26 Oktober 11 s/d 25 November 2011

AWAL AKHIR TOTAL TAHUN TANA

26-Oct-11 2,135 2,141 6 Rolling Mtr 500 Echo J/7/6 2011

27-Oct-11 2,141 2,148 7 Rolling Mtr 500 Echo J/7/6 2011

28-Oct-11 2,148 2,155 7 Timbun Jalan Mtr 50 Echo J/7/6 2011

29-Oct-11 2,155 2,155 

30-Oct-11 2,155 2,155 

31-Oct-11 2,155 2,155 

1-Nov-11 2,155 2,160 5 Rolling Ambil BBM Mtr 700 Echo J/7/6 2011

2-Nov-11 2,160 2,167 7 Cari Kayu Mating + Timbun Jln Mtr 30 Echo J/7/6 2011

3-Nov-11 2,167 2,174 7 Timbun Jalan Mtr 50 Echo J/7/6 2011

4-Nov-11 2,174 2,178 4 Roling Isi BBM Mtr 500 Echo J/7/6 2011

5-Nov-11 2,178 2,184 6 Timbun Jalan Mtr 500 Echo J/-1/K/-1 2011

6-Nov-11 2,184 2,184 

7-Nov-11 2,184 2,184 

8-Nov-11 2,184 2,184 

9-Nov-11 2,184 2,191 7 Timbun Jalan Mtr 300 Echo J/-2/K/-2 2011

10-Nov-11 2,191 2,197 6 Timbun Parit + Roling Mtr 3000 Echo J/-2/K/-2 2011

11-Nov-11 2,197 2,197 

12-Nov-11 2,197 2,197 

13-Nov-11 2,197 2,197 

14-Nov-11 2,197 2,197 

15-Nov-11 2,197 2,206 9 Loading Tanah M³ 60 Echo 2011

16-Nov-11 2,206 2,206 60 Echo 2011

17-Nov-11 2,206 2,209 3 Loading Tanah M³ 40 Echo 2011

18-Nov-11 2,209 2,215 6 Loading Tanah M³ 60 Echo 2011

19-Nov-11 2,215 2,222 7 Loading Tanah M³ 60 Echo 2011

20-Nov-11 2,222 2,227 5 Loading Tanah M³ 60 Echo 2011

21-Nov-11 2,227 2,234 7 Loading Tanah + Tarik Greder  M³ 60 Echo 2011

22-Nov-11 2,234 2,243 9 Roling + Timbun Parit Mtr 1000 Echo K/-5 2011

23-Nov-11 2,243 2,243 

24-Nov-11 2,243 2,243 

25-Nov-11 2,243 2,243 

108

Sedulang, 02 Ju

Dilaporkan oleh

Ka. Kebun Ass. Afdeling Adm. Plantatio

Diminta oleh,

Estate Manager KTU

TOTAL HM

Diperiksa oleh,

I Gede Artana Hapson.S

REKAPITULASI PEKERJAAN ALAT SEWA

NO SPK : …………………………………………..

TANGGALHM

AKTIVITAS SAT QTY AFD BLOKKET

7/16/2019 Rekap HM Alat Berat

http://slidepdf.com/reader/full/rekap-hm-alat-berat 11/11

NAMA OPERATOR : Suprianto

NIA : Ece 03

JENIS ALAT : Excavator MERK : Caterpilar 320D

PERIODE : 26 Oktober 11 s/d 25 November 2011

AWAL AKHIR TOTAL TAHUN TANAM STATUS TANAM

26-Oct-11 1,974 1,984 

27-Oct-11 1,984 1,984 

28-Oct-11 1,984 1,984 

29-Oct-11 1,984 1,984 

30-Oct-11 1,984 1,984 

31-Oct-11 1,984 1,984 

1-Nov-11 1,984 1,984 

2-Nov-11 1,984 1,984 

3-Nov-11 1,984 1,984 

4-Nov-11 1,984 1,984 

5-Nov-11 1,984 1,984 

6-Nov-11 1,984 1,984 

7-Nov-11 1,984 1,984 

8-Nov-11 1,984 1,984 

9-Nov-11 1,984 1,984 

10-Nov-11 1,984 1,984 

11-Nov-11 1,984 1,984 

12-Nov-11 1,984 1,984 

13-Nov-11 1,984 1,984 

14-Nov-11 1,984 1,984 

15-Nov-11 1,984 1,984 

16-Nov-11 1,984 1,984 17-Nov-11 1,984 1,984 

18-Nov-11 1,984 1,984 

19-Nov-11 1,984 1,984 

20-Nov-11 1,984 1,984 

21-Nov-11 1,984 1,984 

22-Nov-11 1,984 1,984 

23-Nov-11 1,984 1,984 

24-Nov-11 1,984 1,984 

25-Nov-11 1,984 1,984 

0

Sedulang, 02 Juli 2011

Dilaporkan oleh,

Ka. Kebun Ass. Afdeling Adm. Plantation SO

REKAPITULASI PEKERJAAN ALAT SEWA

NO SPK : …………………………………………..

TANGGALHM

AKTIVITAS SAT QTY AFD BLOKKETERANGAN

Diminta oleh,

Estate Manager KTU

TOTAL HM

Diperiksa oleh,

I Gede Artana Hapson.S