Rekap HM Alat Berat

11
NAMA OPERATOR : Sabiran NIA : BDZ01 JENIS ALAT : Buldozer MERK : D31A PERIODE : 22 Maret 12 s/d 29 Maret 2012 AWAL AKHIR TOTAL 22-Mar-12 - 10 10  23-Mar-12 10 20 10  24-Mar-12 20 27 7  25-Mar-12 27 35 8  26-Mar-12 35 35 -  27-Mar-12 35 42 7  28-Mar-12 42 47 5  29-Mar-12 47 52 5  30-Mar-12 52 52 -  31-Mar-12 52 52 -  1-Apr-12 52 59 7  2-Apr-12 -  3-Apr-12 - -  4-Apr-12 - -  5-Apr-12 - -  6-Apr-12 - -  7-Apr-12 - -  8-Apr-12 - -  9-Apr-12 - -  10-Apr-12 - -  11-Apr-12 - -  12-Apr-12 - -  - -  59  Brakit, 31 Mare t 2012 Dilaporkan oleh, Supri TOTAL HM Disetujui Oleh, REKAPITULASI PEKERJAAN ALAT BERAT Buldozer D31 (PPHT) TANGGAL HM AKTIVITAS Layani dumptruck di dermaga Layani dumptruck di dermaga Service jalan ATK - km1 Layani dumptruck di dermaga Layani dumptruck di dermaga Layani dumptruck di dermaga Layani dumptruck di dermaga Layani dumptruck di dermaga Service dermaga Cecep Suganda KETERANGAN Diperiksa oleh, Hendra Ningrat

Transcript of Rekap HM Alat Berat

Page 1: Rekap HM Alat Berat

7/16/2019 Rekap HM Alat Berat

http://slidepdf.com/reader/full/rekap-hm-alat-berat 1/11

NAMA OPERATOR : Sabiran

NIA : BDZ01

JENIS ALAT : Buldozer 

MERK : D31A

PERIODE : 22 Maret 12 s/d 29 Maret 2012

AWAL AKHIR TOTAL

22-Mar-12 - 10 10 

23-Mar-12 10 20 10 

24-Mar-12 20 27 7 

25-Mar-12 27 35 8 

26-Mar-12 35 35 - 

27-Mar-12 35 42 7 

28-Mar-12 42 47 5 

29-Mar-12 47 52 5 

30-Mar-12 52 52 - 

31-Mar-12 52 52 - 

1-Apr-12 52 59 7 2-Apr-12 - 

3-Apr-12 - - 

4-Apr-12 - - 

5-Apr-12 - - 

6-Apr-12 - - 

7-Apr-12 - - 

8-Apr-12 - - 

9-Apr-12 - - 

10-Apr-12 - - 

11-Apr-12 - - 

12-Apr-12 - - 

- - 

59 

Brakit, 31 Maret 2012

Dilaporkan oleh,

Supri

TOTAL HM

Disetujui Oleh,

REKAPITULASI PEKERJAAN ALAT BERAT

Buldozer D31 (PPHT)

TANGGALHM

AKTIVITAS

Layani dumptruck di dermaga

Layani dumptruck di dermaga

Service jalan ATK - km1

Layani dumptruck di dermaga

Layani dumptruck di dermaga

Layani dumptruck di dermaga

Layani dumptruck di dermaga

Layani dumptruck di dermaga

Service dermaga

Cecep Suganda

KETERANGAN

Diperiksa oleh,

Hendra Ningrat

Page 2: Rekap HM Alat Berat

7/16/2019 Rekap HM Alat Berat

http://slidepdf.com/reader/full/rekap-hm-alat-berat 2/11

NAMA OPERATOR : Anton

NIA :

JENIS ALAT : Exc 01

MERK : Exa 340

PERIODE : 16 Maret 12 s/d 25 April 2012

PRODUKSI :

AWAL AKHIR TOTAL Hi Shi Sbi

16-Mar-12 8,675 8,675 - 

17-Mar-12 8,675 8,684 9 Produksi batu 250 250 

18-Mar-12 8,684 8,684 - 250 

19-Mar-12 8,684 8,694 10 Produksi batu 200 450 

20-Mar-12 8,694 8,704 10 Produksi batu 200 650 

21-Mar-12 8,704 8,704 - 650 

22-Mar-12 8,704 8,724 20 Produksi batu 200 850 

23-Mar-12 8,724 8,734 10 Produksi batu 200 1,050 

24-Mar-12 8,734 8,745 11 Produksi batu 200 1,250 

25-Mar-12 8,745 8,765 20 Produksi batu 200 1,450 

26-Mar-12 8,765 8,765 - 1,450 27-Mar-12 8,765 8,775 10 Produksi batu 200 1,650 

28-Mar-12 8,775 8,775 - 1,650 

29-Mar-12 8,775 8,775 - 1,650 

30-Mar-12 8,775 8,775 - 1,650 

31-Mar-12 8,775 8,775 - 1,650 

1-Apr-12 8,775 8,775 - 1,650 

2-Apr-12 8,775 8,775 - 1,650 

3-Apr-12 8,775 8,775 - 1,650 

4-Apr-12 8,775 8,775 - 1,650 

5-Apr-12 8,775 8,775 - 1,650 

6-Apr-12 8,775 8,775 - 1,650 

7-Apr-12 8,775 8,775 - 1,650 

8-Apr-12 8,775 8,775 - 1,650 

9-Apr-12 8,775 8,782 7 Produksi batu 200 1,850 10-Apr-12 8,782 8,791 9 Produksi batu 200 2,050 

11-Apr-12 8,791 8,801 10 Produksi batu 200 2,250 

12-Apr-12 8,801 8,801 - 2,250 

13-Apr-12 8,801 8,810 9 Produksi batu 200 2,450 

14-Apr-12 8,810 8,810 - 2,450 

15-Apr-12 8,810 8,821 11 Produksi batu 180 2,630 

16-Apr-12 8,821 8,821 - 2,630 

17-Apr-12 8,821 8,821 - 2,630 

18-Apr-12 8,821 8,830 9 Produksi batu 150 2,780 

19-Apr-12 8,830 8,838 8 Produksi batu 300 3,080 

20-Apr-12 8,838 8,838 - 3,080 

21-Apr-12 8,838 8,858 20 Produksi batu 300 3,380 

22-Apr-12 8,858 8,869 11 Produksi batu 200 3,580 

23-Apr-12 8,869 8,869 - 3,580 

24-Apr-12 8,869 8,880 11 Produksi batu 200 3,780 25-Apr-12 8,880 3,780 

- 3,780 

- 3,780 

- 3,780 

- 3,780 

- 3,780 

- - 3,780 

205 3,780TOTAL HM

REKAPITULASI PEKERJAAN ALAT BERAT

CV Haruman

TANGGALHM

KETERAKTIVITASBBM

Produksi

Page 3: Rekap HM Alat Berat

7/16/2019 Rekap HM Alat Berat

http://slidepdf.com/reader/full/rekap-hm-alat-berat 3/11

Average 18 Ltr/Jam

Brakit, 31 Maret 2

26-Apr-12 8,880 8,888 8 200 

27-Apr-12 8,888 8,897 9 Produksi batu 300 500 

28-Apr-12 8,897 8,897 - 500 

29-Apr-12 8,897 8,897 - Produksi batu 500 

30-Apr-12 8,897 8,927 30 Produksi batu 300 800 

1-May-12 8,927 8,927 - 800 

2-May-12 8,927 8,948 21 Produksi batu 220 1,020 3-May-12 8,948 8,958 10 Produksi batu 200 1,220 

4-May-12 8,958 8,967 9 Produksi batu 200 1,420 

5-May-12 8,967 8,967 - Produksi batu 1,420 

6-May-12 8,967 8,982 15 200 1,620 

7-May-12 8,982 8,989 7 Produksi batu 200 1,820 

8-May-12 8,989 8,989 - 1,820 

9-May-12 8,989 9,002 13 200 2,020 

10-May-12 2,020 

11-May-12 9,002 9,015 13 200 2,220 

12-May-12 - 200 2,420 

13-May-12 9,015 9,027 12 200 2,620 

14-May-12 9,027 9,032 5 200 2,820 

15-May-12 - 2,820 

16-May-12 9,032 9,042 10 200 3,020 

17-May-12 - 3,020 18-May-12 9,042 9,054 12 260 3,280 

19-May-12 9,054 9,063 9 250 3,530 

20-May-12 9,063 9,071 8 Produksi batu 250 3,780 

21-May-12 - Produksi batu 3,780 

22-May-12 9,071 9,085 14 Produksi batu 250 4,030 

23-May-12 4,030 

24-May-12 - Produksi batu 4,030 

- 4,030 

- Produksi batu 4,030 

- 4,030 

- 4,030 

- Produksi batu 4,030 

- Produksi batu 4,030 

- 4,030 - Produksi batu 4,030 

- Produksi batu 4,030 

- 4,030 

- Produksi batu 4,030 

4,030 

- 4,030 

- 4,030 

- 4,030 

- 4,030 

- 4,030 

- - 4,030 

205 2,820

 

TOTAL HM

Page 4: Rekap HM Alat Berat

7/16/2019 Rekap HM Alat Berat

http://slidepdf.com/reader/full/rekap-hm-alat-berat 4/11

NGAN

Page 5: Rekap HM Alat Berat

7/16/2019 Rekap HM Alat Berat

http://slidepdf.com/reader/full/rekap-hm-alat-berat 5/11

12

16.70

Page 6: Rekap HM Alat Berat

7/16/2019 Rekap HM Alat Berat

http://slidepdf.com/reader/full/rekap-hm-alat-berat 6/11

NAMA OPERATOR : Kris

NIA :

JENIS ALAT : Exc 02

MERK : Exa 340

PERIODE : 16 Maret 12 s/d 25 April 2012

PRODUKSI :

AWAL AKHIR TOTAL Hi Shi Sbi

16-Mar-12 6,080 6,080 - 

17-Mar-12 6,080 6,086 6 Produksi batu 150 150 

18-Mar-12 6,086 6,096 10 Produksi batu 200 350 

19-Mar-12 6,096 6,105 9 Produksi batu 200 550 

20-Mar-12 6,105 6,114 9 Produksi batu 200 750 

21-Mar-12 6,114 6,123 9 200 950 

22-Mar-12 6,123 6,132 9 Produksi batu 200 1,150 

23-Mar-12 6,132 6,142 10 Produksi batu 200 1,350 

24-Mar-12 6,142 6,152 10 Produksi batu 200 1,550 

25-Mar-12 6,152 6,162 10 Produksi batu 200 1,750 

26-Mar-12 6,162 6,162 - 1,750 

27-Mar-12 6,162 6,162 - Produksi batu 200 1,950 28-Mar-12 6,162 1,950 

29-Mar-12 - - 1,950 

30-Mar-12 - - 1,950 

31-Mar-12 - - 1,950 

1-Apr-12 - - 1,950 

2-Apr-12 - - 1,950 

3-Apr-12 - - 1,950 

4-Apr-12 - - 1,950 

5-Apr-12 - - 1,950 

6-Apr-12 - - 1,950 

7-Apr-12 - - 1,950 

8-Apr-12 - - 1,950 

9-Apr-12 6,162 6,168 6 Produksi batu 200 2,150 

10-Apr-12 6,168 6,183 15 Produksi batu 200 2,350 

11-Apr-12 6,183 6,183 - Produksi batu 2,350 

12-Apr-12 6,183 6,191 8 150 2,500 

13-Apr-12 6,191 6,191 - Produksi batu 2,500 

14-Apr-12 6,191 2,500 

15-Apr-12 - - Produksi batu 2,500 

16-Apr-12 - - 2,500 

17-Apr-12 - - 2,500 

18-Apr-12 - - Produksi batu 2,500 

19-Apr-12 - - Produksi batu 2,500 

20-Apr-12 - - 2,500 

21-Apr-12 - - Produksi batu 2,500 

22-Apr-12 - - Produksi batu 2,500 

23-Apr-12 - - 2,500 

24-Apr-12 - - Produksi batu 2,500 

25-Apr-12 - 2,500 

26-Apr-12 - 2,500 

27-Apr-12 - 2,500 28-Apr-12 6,191 6,199 200 2,700 

29-Apr-12 6,199 6,209 200 2,900 

30-Apr-12 6,209 2,900 

6,209 6,209 2,900 

111 ####

Average 26 Ltr/Jam

Brakit, 31 Maret 2012

Dilaporkan oleh,

Supri

26-Apr-12 - - 

Cecep Suganda Hendra Ningrat

TOTAL HM 26 

Disetujui Oleh, Diperiksa oleh,

REKAPITULASI PEKERJAAN ALAT BERAT

PT Haruman Jaya Lestari

TANGGALHM

AKTIVITASBBM

Produksi KETERANGAN

Page 7: Rekap HM Alat Berat

7/16/2019 Rekap HM Alat Berat

http://slidepdf.com/reader/full/rekap-hm-alat-berat 7/11

27-Apr-12 - - 

28-Apr-12 - 6,199 200 200 

29-Apr-12 6,199 6,209 10 200 400 

30-Apr-12 6,209 6,209 - 400 

1-May-12 6,209 6,227 18 200 600 

2-May-12 6,227 6,227 - 600 

3-May-12 6,227 6,245 18 300 900 

4-May-12 6,227 6,245 18 900 

5-May-12 6,245 6,245 - 900 

6-May-12 6,245 6,270 25 200 1,100 7-May-12 6,245 6,278 33 200 1,300 

8-May-12 6,278 6,278 1,300 

9-May-12 6,278 6,293 15 300 1,600 

10-May-12 - 1,600 

11-May-12 6,293 6,309 16 300 1,900 

12-May-12 - - 1,900 

13-May-12 6,309 6,326 17 300 2,200 

14-May-12 6,326 6,336 10 300 2,500 

15-May-12 6,326 (6,326) 2,500 

16-May-12 6,336 6,349 13 250 2,750 

17-May-12 6,349 6,357 8 300 3,050 

18-May-12 6,349 (6,349) 3,050 

19-May-12 6,357 6,376 19 300 3,350 

20-May-12 6,376 6,383 7 300 3,650 21-May-12 6,376 (6,376) 3,650 

22-May-12 6,383 (6,383) 3,650 

23-May-12 - - 3,650 

24-May-12 - - 3,650 

25-May-12 - - 3,650 

- - 

- - 

- - 

- - 

- - 

- - 

- - 

- - 

- - 

- - 

- - 

- - 

- - 

- - 

- - 

- - 

- - 

(25,207) ####TOTAL HM (0) 

Page 8: Rekap HM Alat Berat

7/16/2019 Rekap HM Alat Berat

http://slidepdf.com/reader/full/rekap-hm-alat-berat 8/11

NAMA OPERATOR : Misran

NIA :

JENIS ALAT : Excavator 

MERK : Exa 220

PERIODE : 22 Maret 12 s/d 29 Maret 2012

AWAL AKHIR TOTAL

22-Mar-12 - 7 7 

23-Mar-12 7 - 

24-Mar-12 - - 

25-Mar-12 - - 

26-Mar-12 - - 

27-Mar-12 - - 

28-Mar-12 - - 

29-Mar-12 - - 

30-Mar-12

- - 

7

Brakit, 31 Maret 2012

Dilaporkan oleh,

SupriCecep Suganda Hendra Ningrat

TOTAL HM

Disetujui Oleh, Diperiksa oleh,

Service jalan dermaga

Service jalan dermaga

Service jalan dermaga

Minggu / libur 

Service jalan dermaga

Muat batu di dermaga

Muat batu di dermaga + service jalan dermaga

Muat batu

REKAPITULASI PEKERJAAN ALAT BERAT

Excavator 220 (ATK)

TANGGALHM

AKTIVITAS KETERANGAN

Page 9: Rekap HM Alat Berat

7/16/2019 Rekap HM Alat Berat

http://slidepdf.com/reader/full/rekap-hm-alat-berat 9/11

NAMA OPERATOR : Octo

NIA :

JENIS ALAT : Excavator 

MERK : Exa 220

PERIODE : 22 Maret 12 s/d 29 Maret 2012

AWAL AKHIR TOTAL

22-Mar-12 - 10 10 

23-Mar-12 10 20 10 

24-Mar-12 20 30 10 

25-Mar-12 30 38 8 

26-Mar-12 38 38 - 

27-Mar-12 38 46 8 

28-Mar-12 46 51 5 

29-Mar-12 51 56 5 

30-Mar-12 56 56 - 

31-Mar-12 56 56 - 

1-Apr-12 56 62 6 2-Apr-12 62 62 - 

3-Apr-12 62 62 - 

4-Apr-12 62 68 6 

5-Apr-12 68 68 - 

6-Apr-12 68 72 4 

7-Apr-12

- - 

72

Brakit, 31 Maret 2012

Dilaporkan oleh,

Supri

REKAPITULASI PEKERJAAN ALAT BERAT

Excavator 220 (ATK)

TANGGALHM

AKTIVITAS KETERANGAN

Muat batu di dermaga

Muat batu di dermaga + service jalan dermaga

Muat batu

Service jalan dermaga

Minggu / libur 

Service jalan dermaga

Service jalan dermaga

Service jalan dermaga

Service jalan dermaga

loading batu

Service jalan dermaga

Diperiksa oleh,

Cecep Suganda Hendra Ningrat

TOTAL HM

Disetujui Oleh,

Page 10: Rekap HM Alat Berat

7/16/2019 Rekap HM Alat Berat

http://slidepdf.com/reader/full/rekap-hm-alat-berat 10/11

NAMA OPERATOR : BowoNIA : Ece 03

JENIS ALAT : Excavator 

MERK : Hitachi 210LC

PERIODE : 26 Oktober 11 s/d 25 November 2011

AWAL AKHIR TOTAL TAHUN TANA

26-Oct-11 2,135 2,141 6 Rolling Mtr 500 Echo J/7/6 2011

27-Oct-11 2,141 2,148 7 Rolling Mtr 500 Echo J/7/6 2011

28-Oct-11 2,148 2,155 7 Timbun Jalan Mtr 50 Echo J/7/6 2011

29-Oct-11 2,155 2,155 

30-Oct-11 2,155 2,155 

31-Oct-11 2,155 2,155 

1-Nov-11 2,155 2,160 5 Rolling Ambil BBM Mtr 700 Echo J/7/6 2011

2-Nov-11 2,160 2,167 7 Cari Kayu Mating + Timbun Jln Mtr 30 Echo J/7/6 2011

3-Nov-11 2,167 2,174 7 Timbun Jalan Mtr 50 Echo J/7/6 2011

4-Nov-11 2,174 2,178 4 Roling Isi BBM Mtr 500 Echo J/7/6 2011

5-Nov-11 2,178 2,184 6 Timbun Jalan Mtr 500 Echo J/-1/K/-1 2011

6-Nov-11 2,184 2,184 

7-Nov-11 2,184 2,184 

8-Nov-11 2,184 2,184 

9-Nov-11 2,184 2,191 7 Timbun Jalan Mtr 300 Echo J/-2/K/-2 2011

10-Nov-11 2,191 2,197 6 Timbun Parit + Roling Mtr 3000 Echo J/-2/K/-2 2011

11-Nov-11 2,197 2,197 

12-Nov-11 2,197 2,197 

13-Nov-11 2,197 2,197 

14-Nov-11 2,197 2,197 

15-Nov-11 2,197 2,206 9 Loading Tanah M³ 60 Echo 2011

16-Nov-11 2,206 2,206 60 Echo 2011

17-Nov-11 2,206 2,209 3 Loading Tanah M³ 40 Echo 2011

18-Nov-11 2,209 2,215 6 Loading Tanah M³ 60 Echo 2011

19-Nov-11 2,215 2,222 7 Loading Tanah M³ 60 Echo 2011

20-Nov-11 2,222 2,227 5 Loading Tanah M³ 60 Echo 2011

21-Nov-11 2,227 2,234 7 Loading Tanah + Tarik Greder  M³ 60 Echo 2011

22-Nov-11 2,234 2,243 9 Roling + Timbun Parit Mtr 1000 Echo K/-5 2011

23-Nov-11 2,243 2,243 

24-Nov-11 2,243 2,243 

25-Nov-11 2,243 2,243 

108

Sedulang, 02 Ju

Dilaporkan oleh

Ka. Kebun Ass. Afdeling Adm. Plantatio

Diminta oleh,

Estate Manager KTU

TOTAL HM

Diperiksa oleh,

I Gede Artana Hapson.S

REKAPITULASI PEKERJAAN ALAT SEWA

NO SPK : …………………………………………..

TANGGALHM

AKTIVITAS SAT QTY AFD BLOKKET

Page 11: Rekap HM Alat Berat

7/16/2019 Rekap HM Alat Berat

http://slidepdf.com/reader/full/rekap-hm-alat-berat 11/11

NAMA OPERATOR : Suprianto

NIA : Ece 03

JENIS ALAT : Excavator MERK : Caterpilar 320D

PERIODE : 26 Oktober 11 s/d 25 November 2011

AWAL AKHIR TOTAL TAHUN TANAM STATUS TANAM

26-Oct-11 1,974 1,984 

27-Oct-11 1,984 1,984 

28-Oct-11 1,984 1,984 

29-Oct-11 1,984 1,984 

30-Oct-11 1,984 1,984 

31-Oct-11 1,984 1,984 

1-Nov-11 1,984 1,984 

2-Nov-11 1,984 1,984 

3-Nov-11 1,984 1,984 

4-Nov-11 1,984 1,984 

5-Nov-11 1,984 1,984 

6-Nov-11 1,984 1,984 

7-Nov-11 1,984 1,984 

8-Nov-11 1,984 1,984 

9-Nov-11 1,984 1,984 

10-Nov-11 1,984 1,984 

11-Nov-11 1,984 1,984 

12-Nov-11 1,984 1,984 

13-Nov-11 1,984 1,984 

14-Nov-11 1,984 1,984 

15-Nov-11 1,984 1,984 

16-Nov-11 1,984 1,984 17-Nov-11 1,984 1,984 

18-Nov-11 1,984 1,984 

19-Nov-11 1,984 1,984 

20-Nov-11 1,984 1,984 

21-Nov-11 1,984 1,984 

22-Nov-11 1,984 1,984 

23-Nov-11 1,984 1,984 

24-Nov-11 1,984 1,984 

25-Nov-11 1,984 1,984 

0

Sedulang, 02 Juli 2011

Dilaporkan oleh,

Ka. Kebun Ass. Afdeling Adm. Plantation SO

REKAPITULASI PEKERJAAN ALAT SEWA

NO SPK : …………………………………………..

TANGGALHM

AKTIVITAS SAT QTY AFD BLOKKETERANGAN

Diminta oleh,

Estate Manager KTU

TOTAL HM

Diperiksa oleh,

I Gede Artana Hapson.S