Hit. Drainase

Post on 16-Nov-2015

3 views 1 download

description

DRAINASE

Transcript of Hit. Drainase

  • DRAINASE BANDAR UDARA

    INTENSITAS HUJAN PERTAHUN= 3500 MM /JAMDIPERLUKAN HUJAN 2 BLN / 60 HARI RATA-RATAHUJAN

    TIAP HARI 24 JAM= 3500 X 60 =365 X 24

    SAL. TERTUTUP SBLAH KIRI RUNWAYLEBAR RUNWAY = 45 MPANJANG DAERAH ALIRAN (MELINTANG) = 4539,37 MLUAS DAERAH A = 45 X 4539,37 =

    2DEBIT AIR Q = F.C.I.AI = 23,97260274 = 23,97260274 X 10^-3

    3600= 6,65906E-06= 6,659 x 10^-6 m/dt

    DEBIT AIR Q = F.C.I.A= 0,278 x 0,9 x 6,659 x= 0,170166639 M3/DT

    SAL. TERTUTUP IMerupakan sall. Yg terletak dikanan kiri runwayB = 0,5X hQ = VXA ; V DIAMBIL 0,2 M/DT

    0,170166639 = 0,2 X 0,5 h2h2 = 0,170166639 / 0,1

    = 1,701666392h = akar dr 1,701666

    = 1.307= 1,31

    b = 0,5 x 1,31= 0,655 m

    h = 1,31 mb = 1,31 x 0,5

    = 0,655

    kemiringan saluran

    V = K.R ^2/3. I ^1/2K = 60 ( BATU BATA )V = 0,2 M/DTO = 2H+B=2 (1.31)+.655

    = 3,275 M/DT

    R = A/O= 0,262 M

    I = 0,007074139 M

  • 210000 = 23,9726 MM/JAM8760

    102135,8 M2

    10^-6 x 102135,8