galianVOLUME GALIANPROYEK:PEMELIHARAAN PRIODIK JALAN JURUSAN SP. PASAR RAWA -:PASAR RAWA SEP. 2. 000M X 3,5M KEC, GEBANGPEKERJAAN:KONSTRUKSI DINDING PENAHANLOKASI:KEC. SEI. GEBANGKONTRAKTOR:CV. SURYA BARUMUN SETIAGambarStationingPanjangGalian Tanah PondasiVolume(A)(B)VolumeYang Dibayar(m)(m)(m)(m3)(m3)PT.0-PT. 55.001.000.303.003.00PT.5-PT. 105.001.000.303.003.00PT.10-PT. 155.001.000.303.003.00PT.15-PT. 205.001.000.303.003.00APT.20-PT. 255.001.000.303.003.00PT.25-PT. 305.001.000.303.003.00BPT.30-PT. 355.001.000.303.003.00PT.35-PT. 405.001.000.303.003.00181.56TOTAL40.0024.0024.0011962VOLUME BEKISTINGPROYEK:PEMELIHARAAN PRIODIK JALAN JURUSAN SP. PASAR RAWA -:PASAR RAWA SEP. 2. 000M X 3,5M KEC, GEBANGPEKERJAAN:KONSTRUKSI DINDING PENAHANLOKASI:KEC. SEI. GEBANGKONTRAKTOR:CV. SURYA BARUMUN SETIAGambarStationingPanjangBekistingVolumeLebarTinggi (t)VolumeYang Dibayar(m)(m)(m)(m3)(m3)PT.0-PT. 55.000.601.509.009.00PT.5-PT. 105.000.601.509.009.00PT.10-PT. 155.000.601.509.009.00PT.15-PT. 205.000.621.609.969.96PT.20-PT. 255.000.601.509.009.00PT.25-PT. 305.000.601.509.009.00PT.30-PT. 355.000.601.509.009.00PT.35-PT. 405.000.601.509.009.00TOTAL40.0072.9672.96VOLUME TIMBUNANPROYEK:PEMELIHARAAN PRIODIK JALAN JURUSAN SP. PASAR RAWA -:PASAR RAWA SEP. 2. 000M X 3,5M KEC, GEBANGPEKERJAAN:KONSTRUKSI DINDING PENAHANLOKASI:KEC. SEI. GEBANGKONTRAKTOR:CV. SURYA BARUMUN SETIAGambarStationingPanjangTimbunan di sisi dinding penahanVolume(A)(B)VolumeYang Dibayar(m)(m)(m)(m3)(m3)PT.0-PT. 55.000.540.502.702.70PT.5-PT. 105.000.540.502.722.72PT.10-PT. 155.000.600.503.003.00PT.15-PT. 205.000.600.503.003.00PT.20-PT. 255.000.600.503.003.00APT.25-PT. 305.000.600.503.003.00PT.30-PT. 355.000.600.503.003.00BPT.35-PT. 405.000.500.502.502.50TOTAL40.0022.9222.92VOLUME GALIAN : PARIT BETONPROYEK:Pembuatan Parit Beton sep. 750m di Dusun I:Namo Tating Kec. SelesaiPEKERJAAN:Pembuatan Parit BetonLOKASI:Kec. SEI. BINGAIKONTRAKTOR:CV. KURNIAGambar SaluranStationingPanjangBeton Cor LantaiVolumeLebarTinggi (t)VolumeYang Dibayar(m)(m)(m)(m3)(m3)PT. 0-PT. 2525.000.500.101.251.25PT. 25-PT. 5025.000.500.101.251.25PT. 50-PT. 7525.000.500.101.251.25PT. 75-PT. 10025.000.500.101.251.25PT. 100-PT. 12525.000.500.101.251.25PT. 125-PT. 15025.000.500.101.251.25PT. 150-PT. 17525.000.500.101.251.25PT. 175-PT. 20025.000.500.101.251.25PT. 200-PT. 22525.000.500.101.251.25PT. 225-PT. 25025.000.500.101.251.25PT. 250-PT. 27525.000.500.101.251.25PT. 275-PT. 30025.000.500.101.251.25PT. 300-PT. 32525.000.500.101.251.25PT. 325-PT. 35025.000.500.101.251.25PT. 350-PT. 37525.000.500.101.251.25PT. 375-PT. 40025.000.500.101.251.25PT. 400-PT. 42525.000.500.101.251.25PT. 425-PT. 45025.000.500.101.251.25PT. 450-PT. 47525.000.500.101.251.25PT. 475-PT. 50025.000.500.101.251.25PT. 500-PT. 52525.000.500.101.251.25PT. 525-PT. 55025.000.500.101.251.25PT. 550-PT. 57525.000.500.101.251.25PT. 575-PT. 60025.000.500.101.251.25PT. 600-PT. 62525.000.500.101.251.25PT. 625-PT. 65025.000.500.101.251.25PT. 650-PT. 67525.000.500.101.251.25PT. 675-PT. 70025.000.500.101.251.25PT. 700-PT. 72525.000.500.101.251.25PT. 725-PT. 75025.000.500.101.251.25PT. 750-PT. 7533.000.500.100.150.15TOTAL753.0037.6537.6537.65

Diteliti Oleh : Pengawas 1

ROMI SAPUTRA, STNIP.19790519 201101 1 007Dibuat Oleh : SURYA BARUMUN SETIA

KHAIRUL AMRIDirektur UtamaDiperiksa Oleh,KONSULTANSUPERVISI

Ir. DARTA M. BANGUNChief IspectorDiperiksa Oleh,KONSULTANSUPERVISI

KURNIA DIPA TARIGAN, STSite EngineerDiperiksa Oleh,ASISTEN TEHNIK

SULAIMAN SITEPU, S.SosNip. 19680412 199303 1 006Diperiksa Oleh,PEJAT ABAT PEMBUAT KOMTMEN (PPK)

ARIO DARMANTA GINTING, STNip. 19781207 201101 1 005Diteliti Oleh : Pengawas 1

ROMI SAPUTRA, STNIP.19790519 201101 1 007Dibuat Oleh : SURYA BARUMUN SETIA

KHAIRUL AMRIDirektur UtamaDiperiksa Oleh,KONSULTANSUPERVISI

Ir. DARTA M. BANGUNChief IspectorDiperiksa Oleh,KONSULTANSUPERVISI

KURNIA DIPA TARIGAN, STSite EngineerDiperiksa Oleh,ASISTEN TEHNIK

SULAIMAN SITEPU, S.SosNip. 19680412 199303 1 006Diperiksa Oleh,PEJAT ABAT PEMBUAT KOMTMEN (PPK)

ARIO DARMANTA GINTING, STNip. 19781207 201101 1 005Diteliti Oleh : Pengawas 1

ROMI SAPUTRA, STNIP.19790519 201101 1 007Dibuat Oleh : SURYA BARUMUN SETIA

KHAIRUL AMRIDirektur UtamaDiperiksa Oleh,KONSULTANSUPERVISI

Ir. DARTA M. BANGUNChief IspectorDiperiksa Oleh,KONSULTANSUPERVISI

KURNIA DIPA TARIGAN, STSite EngineerDiperiksa Oleh,ASISTEN TEHNIK

SULAIMAN SITEPU, S.SosNip. 19680412 199303 1 006Diperiksa Oleh,PEJAT ABAT PEMBUAT KOMTMEN (PPK)

ARIO DARMANTA GINTING, STNip. 19781207 201101 1 005

pondasiVOLUME PONDASIPROYEK:PEMELIHARAAN PRIODIK JALAN JURUSAN SP. PASAR RAWA -:PASAR RAWA SEP. 2. 000M X 3,5M KEC, GEBANGPEKERJAAN:KONSTRUKSI DINDING PENAHANLOKASI:KEC. SEI. GEBANGKONTRAKTOR:CV. SURYA BARUMUN SETIAGambarStationingPanjangBeton Cor PondasiVolume(a)(b)VolumeYang Dibayar(m)(m)(m)(m3)(m3)PT.0-PT. 55.000.400.400.800.80PT.5-PT. 105.000.400.400.800.80PT.10-PT. 155.000.400.400.800.80PT.15-PT. 205.000.400.400.800.80PT.20-PT. 255.000.400.400.800.80PT.25-PT. 305.000.400.400.800.80PT.30-PT. 355.000.400.400.800.80PT.35-PT. 405.000.400.400.800.80165.50TOTAL40.006.40VOLUME BETON COR DINDINGPROYEK:PEMELIHARAAN PRIODIK JALAN JURUSAN SP. PASAR RAWA -:PASAR RAWA SEP. 2. 000M X 3,5M KEC, GEBANGPEKERJAAN:KONSTRUKSI DINDING PENAHANLOKASI:KEC. SEI. GEBANGKONTRAKTOR:CV. SURYA BARUMUN SETIAGambarStationingPanjangBeton Cor DindingVolume(a)(b)(b)Yang Dibayar(m)(m)(m)(m)(m3)PT.0-PT. 55.000.300.401.601.75PT.5-PT. 105.000.300.401.601.75APT.10-PT. 155.000.300.401.601.75PT.15-PT. 205.000.300.401.601.75PT.20-PT. 255.000.300.401.601.75PT.25-PT. 305.000.300.401.601.75PT.30-PT. 355.000.300.401.601.75PT.35-PT. 405.000.300.401.601.75B24105.68TOTAL40.0014.00VOLUME TOTAL40.0020.40VOLUME PELASTERANPROYEK:PEMELIHARAAN PRIODIK JALAN JURUSAN SP. PASAR RAWA -:PASAR RAWA SEP. 2. 000M X 3,5M KEC, GEBANGPEKERJAAN:KONSTRUKSI DINDING PENAHANLOKASI:KEC. SEI. GEBANGKONTRAKTOR:CV. SURYA BARUMUN SETIAGambarStationingPanjangPelasteranVolume(a)(b)Yang Dibayar(m)(m)(m3)(m3)PT.0-PT. 55.001.550.309.24PT.5-PT. 105.001.600.309.50PT.10-PT. 155.001.500.309.00PT.15-PT. 205.001.600.309.50PT.20-PT. 255.001.600.309.50PT.25-PT. 305.001.500.309.00PT.30-PT. 355.001.500.309.00PT.35-PT. 405.001.600.309.5089.48TOTAL40.0074.24

Diteliti Oleh : Pengawas 1

ROMI SAPUTRA, STNIP.19790519 201101 1 007Dibuat Oleh : SURYA BARUMUN SETIA

KHAIRUL AMRIDirektur UtamaDiperiksa Oleh,KONSULTANSUPERVISI

Ir. DARTA M. BANGUNChief IspectorDiperiksa Oleh,KONSULTANSUPERVISI

KURNIA DIPA TARIGAN, STSite EngineerDiperiksa Oleh,ASISTEN TEHNIK

SULAIMAN SITEPU, S.SosNip. 19680412 199303 1 006Diperiksa Oleh,PEJAT ABAT PEMBUAT KOMTMEN (PPK)

ARIO DARMANTA GINTING, STNip. 19781207 201101 1 005Diteliti Oleh : Pengawas 1

ROMI SAPUTRA, STNIP.19790519 201101 1 007Dibuat Oleh : SURYA BARUMUN SETIA

KHAIRUL AMRIDirektur UtamaDiperiksa Oleh,KONSULTANSUPERVISI

Ir. DARTA M. BANGUNChief IspectorDiperiksa Oleh,KONSULTANSUPERVISI

KURNIA DIPA TARIGAN, STSite EngineerDiperiksa Oleh,ASISTEN TEHNIK

SULAIMAN SITEPU, S.SosNip. 19680412 199303 1 006Diperiksa Oleh,PEJAT ABAT PEMBUAT KOMTMEN (PPK)

ARIO DARMANTA GINTING, STNip. 19781207 201101 1 005Diteliti Oleh : Pengawas 1

ROMI SAPUTRA, STNIP.19790519 201101 1 007Dibuat Oleh : SURYA BARUMUN SETIA

KHAIRUL AMRIDirektur UtamaDiperiksa Oleh,KONSULTANSUPERVISI

Ir. DARTA M. BANGUNChief IspectorDiperiksa Oleh,KONSULTANSUPERVISI

KURNIA DIPA TARIGAN, STSite EngineerDiperiksa Oleh,ASISTEN TEHNIK

SULAIMAN SITEPU, S.SosNip. 19680412 199303 1 006Diperiksa Oleh,PEJAT ABAT PEMBUAT KOMTMEN (PPK)

ARIO DARMANTA GINTING, STNip. 19781207 201101 1 005