Babar-VR R04

Post on 22-Feb-2017

113 views 4 download

Transcript of Babar-VR R04

mzbabar@msn.com

I am basically a…

Working as a

Bachelors From…

In 2000

WORK

WORK

As a Site Engineer

1st Job-2000

As a Coordinating Engineer

OIL AND GAS/ BUILDING

As a Project Engineer

In 2001

• Managed & Controlled

• Planned

• Executed and Monitored

OIL AND GAS

In 2002, moved to…

KHOBAR, KSA

As a Civil Estimator/ Planner

In 2002

Supplied by

• Estimated the cost of different projects under GSO & Base Crew Contracts.

• Estimated the quantities of materials & Labors &Planned the labors

• Made Scope of work by following Saudi ARAMCO Standards & Specifications.

• Made Class III Estimates

OIL AND GAS

In 2003, moved to…

ABU DHABI, UAE

As a Planning and Cost Control Engineer

In 2003

• Planning Works

• Cost Control Works

• Issue Management

• Reporting

• Tendering Works

• Prequalification Works

• MR Works

• Change Management

• Portfolio Management

• Schedule Control

• Risk Management

INFRASTRUCTURE

As a Cost Controller (Project Controller)

In 2007

Left because of some Family Issues

• Planning Works

• Cost Control Works

• Issue Management

• Reporting

• Change Management

• Portfolio Management

• Schedule Control

• Risk Management

BUILDINGS

In 2007, moved back to…

LAHORE, PAK

As a Project Control Engineer

In 2007

• Planning Works

• Cost Control Works

• Issue Management

• Reporting

• Tendering Works

• Change Management

• Portfolio Management

• Risk Management

• Schedule Control

INFRASTRUCTURE

As a Manager Project Controls

In 2008

• Planning Works

• Cost Control Works

• Issue Management

• Reporting

• Tendering Works

• Change Management

• Portfolio Management

• Risk Management

• Schedule Control

• SAP PS Team Lead

• Power User

• Change Lead

• Document Control

• Productivity Control

• Procurement Control

• Engineering Deliverables Control

OIL AND GAS

Masters From…

MS TQM (Total Quality Management)

Project Management, Quality Management, Performance Management, Supply Chain Management, Human Resource

Management, MIS, Organizational Behavior, Strategic Planning & Deployment, Quality Tools, Health, Safety and Environment al

Management, International Management System & Standards, Production & Operation Management, Marketing and Financial

Management

In 2010

PGD From…

Project Planning and Control

In 2010

Certified…

In 2011

In 2012

In 2013, again moved to…

RIYADH, KSA

Working as a

2013 – till date

Hired as a Senior Project Controls Engineer

• Planning Works

• Cost Control Works

• Issue Management

• Reporting

• Change/Trend Management

• Risk Management

• Schedule Control

• Document Control

• Procurement Control

• Engineering Deliverables Control

BUILDINGS

AREAS WORKED IN…

Upto date with latest technologies…

Computer Skills …

Received Professional Trainings…

CO-ECP

Received Management Trainings…

CO-ECP

Member of…

Expert in Implementing Project Controls by using various Tools and Techniques in the Areas of Engineering, Procurement, Construction and Commissioning Phases.

in no time got recognition fromTop brass

A WELL BALANCED PROFESSIONAL

Think out of the BOX

TakingInitiative

0%

20%

40%

60%

80%

100%

120%

Jun-09 Jul-09 Aug-09 Sep-09 Oct-09 Nov-09 Dec-09 Jan-10 Feb-10 Mar-10 Apr-10 May-10 Jun-10 Jul-10 Aug-10

% P

rog

res

s

Time Wise S- Curve for Contract No. ABC