No. 92/CEDO/SR/4/0/Pt. New Delhi, dated 31.12.2010
Principal Chief Engineer,
Western Railway,
Mumbai.
Sub: Correction Slip to Railway Board’s Policy Circular no. 6 for attaching Parcel Van in place of Inspection Carriage as 25%
vehicle.
Ref : Your ietter no. W/636/16/10(W-3), dated 31.12.10,
In above reference, it is to inform that Correction Slip to Railway
Board's Policy Circular no. 6 (issued vide Railway Board's letter no. 92/CEDO/
SR/4/O/Pt.I, dated 23.11.06) for attaching Parcel Van in place of Inspection
Carriage as 25™ vehicle in 24 coach passenger carrying trains is under
consideration in consultation with CCRS. ‘
Final disposal of the issue shall be communicated shortly.
PPAF VIADIYVXVD
DDD
YD 3
ae Meee Government Of India ga Hataa Ministry Of Railways (aa ate) (Railway Board)
No. 92/CEDO/SR/4/0/Pt. New Delhi, dated 31.12.2010
Principal Chief Engineer,
Western Railway,
Mumbai.
Sub: Correction Slip to Railway Board's Policy Circular no. 6 for attaching Parcel Van in place of Inspection Carriage as 25" vehicle. ;
Ref : Your letter no. W/636/16/10(W-3), dated 31.12.10.
In above reference, it is to inform that Correction Slip to Railway
Board's Policy Circular no. 6 (issued vide Railway Board's letter no. 92/CEDO/
SR/4/O/Pt.I, dated 23.11.06) for attaching Parcel Van in place of Inspection
Carriage as 25" vehicle in 24 coach passenger carrying trains is under
consideration in consultation with CCRS. ‘ oo
Final disposal of the issue shall be communicated shortly.
au, (streitas agatey
arent fesesfhfaa soiffraiava.Acde até
moe
®
} ' a
/ Higa WewBTT Government Of India
f co
.
a
a! aa waraa Ministry Of Railways
t
se @aa at&) (Railway Board)
—
é A No. 2010/CEDO/SR/28 New Delhi, dated 22.12. 2010
mC The General Manager.
North Central Railway.
vs Allahabad
Sub : Provisional running of Rail Grinding Machine (Model No. RGI-72), supplied
o by M/s LORAM, USA having axle lead of 22.75t at a maximum speed of 50
I kmph when running on its own power and 65 kmph when running in train
formation as a dead vehicle over entire BG sections of N.C. Railway.
> Ref : Your letter no. 355-W/CRS/RGM (model No. RGI-72)/NCR/Bridge, dated
A 03.11.2010.
i“ In reference to above, sanction of Ministry of Railways, Railway Board is hereby
~ communicated for Provisional running of Rail Grinding Machine (Model No. RGI-72),
, supplied by M/s LORAM, USA having oxle load of 22.75t at a maximum speed of 50
o kmph when running on its own power and 65 kmph when running in train formation as a
dead vehicle over entire BG sections of North Central Railway or at sectional speed
™ whichever is less subject to terms and conditions as given in RDSO's provisional
nN speed certificate and North Central Railways Joint Safety Certificate, Track
Certificate & other Certificates accompanying above referred letter.
Lo
oO
: 32112
i
(aietras Bate)
‘ . ardent Pieers/Rafra gelrrafterar et até
° No. 2010/CEDO/SR/28 New Delhi, dated 22.12.2010
a Copy forwarded for information to :
rm 1. The Chief Commissioner of Railway Safety. Compound of DRM/NER, Ashok Marg,
om Lucknow -226001 w.r.t. his endorsement no. Q. 13011/15/2010 a fa... dated 30.11.10.
—_ 2. The Commissioner of Railway Safety, North Eastern Circle, Hazratganj, Lucknow -
as 226001 w.r.t. his letter no. 3499/Rail Grinding Machine model No. RG/72/1258,
dated 16.11.10.
oo 3, Director General, RDSO, Lucknow for information.
aN 4. Executive Direct dande- hot DSO, Manak Nagar. Lucknow-226011,
wt, his lett TM/HMELL/ 3. dated P2.07.2010 A wrt. his letter n nancdl SPUR. ate a 2
: cK) 2 ard
Bada-re
a Prager a7 catreiras Gay)
A gti oa, PM rciorure
ael waraa, yard are
: : vighat
.
~ Copy to wal FT ad
(i) General Manager Ail'indien Railways (except. orth Central Railway)
rm (ii) Commissioner of Railway Safety, All circles (except North Eastern Circle)
o> of} C_
3)
ae fe
x)
Oe? ah —_~
“ ms HITeT wRHTX Government Of India
- 2A HATA Ministry Of Railways A (goa stS) (Railway Board)
co
No. 2010/CEDO/SR/11 New Delhi, Dated 22.12.2010
o~ The Director General, ~ RDSO, Manak Nagar,
Lucknow - 226011, o
™ Sub: Condonation of infringements to Indian Railways (BG) Schedule of ~ Dimensions Revised, 2004 for EOG Air Conditioned Double Decker Coaches - manufactured by RCF, Kapurthala.
” Ref: RDSO's letter no. MC/CB/AC/DD, dated 22.11.10. on
~ With reference to above, Ministry of Railways, Railway Board have approved the revision to Para-3 of Railway Board's sanction letter of even no., dated 11.05.10. Accordingly, revised Para as mentioned below is substituted in supersession to the Para-3 :
” "3(@) The minimum clearance required to run EQG Air Conditioned Double Decker Coaches ~ a manufactured by RCF/Kapurthala from fixed structures on platform line is 150 mm
. beyond kinematic profile, as shown in RDSO sketch no. CG-10014/Alt.1. “ 3(b) These coaches shall not run on platform lines at Speed beyorid 75 kmph in case of ~ clearance between 150 mm to 225 mm, as shown in RDSO sketch no. CG-10014/Alt.1:
3{c) Minimum clearance of above 225 mm beyond kinematic profile, as shown in RDSO ~ sketch no. CG-10014/Alt.1 is required for operation of these coaches at speed ~ beyond 75 kmph.
3(d) The speed restriction imposed by Railways should be visibly printed in Working Time ~ Tables and also displayed in Cabins & SM’s rooms etc."
~ ae CC & ee
‘ oft (aTeiras aarte) ~ arent fresafafac goifraRavea. Aaa ar
‘ Copy to : ;
‘ * CCRS/Lucknow for kind information. * Commissioner of Railway Safety, All Circles.
\ « Executive Director/Track-I, RDSO, Lucknow. ‘ * General Manager, All Indian Railways. They may identify locations having such
, infringements & take suitable action for removing the same, so that above stock may ‘
run at full sectional speed.
for kind information of CRB, ME, MT, ML & MM,
Signature.
ara at af Date of issue o.oo. ee cesese Co
) 2 1d! J
}
stIga saxwere Government Of India
ga AATAT Ministry Of Railways (@#aat atS) (Railway Board)
No. 92/CEDO/SR/4/0/Pt.I New Delhi, dated 21.12.2010
The Chief Commissioner of Railway Safety, Compound Of Office OF DRM/NER, ™
Ashok Marg, Lucknow-226001.
Sub: Correction Slip to Para 6.1.(a) & (b) of Revised Policy Circular No. 6 for
sanction of speed of nominated trains on specific routes. .
Ref: Railway Board's letter no, 92/CEDO/SR/4/0/Pt.T, dated 23.11.06.
The Policy Circutar No. 6 for sanction of speed of nominated trains on specific routes was issued by Civil Engg. Directorate as ‘Engineering Standing Order No. 13’, vide Railway
Board's letter no. 92/CEDO/SR/4/0/Pt., dated 23.12.99. Thereafter, in view of proposals of
running faster and longer trains, this circular was revised by CE(G) Directorate with the
approval of Board & in consultation with CCRS vide Board's letter under reference above.
Subsequently, TC(FM) Directorate of Railway Board vide letter no, 2008/TC(FM)/10/
12, dated 12.02.09 modified this Policy Circular as under without consulting ME and CCRS :
“In passenger carrying trains running with 24 coaches, there is permission to attach
an Inspection Carriage*as a 25 Coach as per the provisions of Railway Board circular
under reference above.
It has now been decided that this provision shall be extended to include a leased Parcel Van also, Therefore, henceforth the 25" Coach can be an Inspection Carriage
or a feased Parcel van. The running of 24+1 Parcel Van (leased) will, however, be
subject to concerned CME/CEE (depending upon traction) certifying the adequacy of
powering of train,”
Since attachment of 25™ coach (Parcel Van in place of Inspection Carriage) is possible
only by inclusion of such provisions in Policy Circular No. 6, suitable amendments would be
required to be issued to this effect, if considered o.k.
You are, therefore, requested to kindly offer your considered views on the above
subject, so that final decision may be taken by Railway Board.
DA: Railway Board's letter no. 92/CEDO/SR/4/0/Pt.I, dated 23.11.06
Railway Board's letter no. 7 TCHEM)/10/12, dated 12.02.09 <2, Ch
on (siicttas BaATe) a arent Revefalte doifeaharn rad ats
ale cu ; ate
\2\
Beles
4 >
Ss)
Ly.
a
“>
» 9
,7)
Df)
aa)
GOVERNMENT OF INDIA
— MINISTRY OF RAILWAYS (RAILWAY BOARD)
No, 92/CEDO/SR/4/0/PtI New Delhi, dated 23.11.2006.
The General Managers, “
All Indian Railways.
The General Manager
Metro Railway, Kolkata.
The Director General,
RDSO, Lucknow.
The Managing Director,
Konkan Railway Corporation Limited,
Navi Mumbai.
Subject:- Revision of Policy Circular No. 6 - Para 6 and Appendix I & 2.
Board ( ME,MT,ML&MM) have approved the revision of Para No. 6 &
Appendix I & 2 of Policy Circular No. 6, earlier circulated vide Railway Board ietter
No. 92/CEDO/SR/4/O/Pt.dated 23.12.1999 as Engineering Standing Order No. 13
wo
In supersession of the existing para, the revised Para No. 6 and-Appendix I & 2
of Policy Circular No. 6 to be substituted in the existing Engineering Standing Order
No. 13 is enclosed.
This is for your information and necessary action. -
DA: As above(4 pages) “4 2 in faest
‘ (T. TA) Executive Director Civil Engg(G)
Copy to:-
Sr. PPS to CRB, ME, MT, ML, MM, FC, MS, Secretary for kind information of
CRB, ME, MT, ML, MM, FC, MS & Secretary.
CCRS/ Lucknow for kind information.
Director/IRICEN/Pune for kind information.
x REVISED PARA NO. 6 OF POLICY CIRCULAR NO. 6 & APPENDIX I & 2 hen GTRCULAR NO. 6 & APPENDIX & 2 c SANCTION OF SPEED OF NOMINATED TRAINS ON SPECIFIC ROUTES
Before permitting regular operation of trains at speed above 105 Km/h on the BG and ~ above 75 Km/h on MG, the’ following procedure shall normally be followed, unless x otherwise decided with the concurrence of the Chief Commissioner of Railway Safety:. ~ 6.1.(a) For speed upto 110 Km/h on BG
~ (i) _ _ For permitting speeds above 105 Km/h, the track. on the route Should be maintained to ~ standards specified in RDSO Report No. C&M-1, Volume-. RDSO speed certificate & . CRS sanction should exist for that type of rolling stock, . (ii) Zonal Railways may increase the length-of trains upto 24 coaches plus one Inspection . Carriage, without CRS sanction, provided various departments of the Zonal Railway . certify ( as required to be done for obtaining CRS Sanction) to PCE/CE(Co-ordination) that the necessary conditions for funning such train have been fulfilled and that the ~ stopping stations have been provided with necessary facilities like the required length and Width of platforms, removal of infringements, lighting and watering arrangements etc, on the platform. The sanction to the proposal shall be granted by PCE/CE(Co-ordination).
. 6.1) For Speed above 110 Km/h and upto 120 Km/h on BG
Zonal Railways shall conduct route proving runs at proposed speed of operation for running trains upto 24 coaches plus one Inspection Carriage using portable accelerometers mounted on rolling stock(locomotives and representative vehicles which are proposed to be cleared for speeds above 110 km/h and upto 120 Km/h) for recording vertical and transverse accelerations through out the route. If the results obtained satisfy the stipulated criteria, as given in Appendix-I, Railway shall approach the Commissioner of Railway Safety for permitting operation of the first such train on that route.
Gi) = For subsequent additional trains or augmentation of load of an existing train subject to maximum train load and speed as per para (i) above and with similar type of rolling stock, route Proving run is not required. In such cases, CRS sanction is also not required to be obtained provided, Zonal Railway certify to CRS that they would strictly follow all the conditions and stipulations faid down by him in th Sanctioned in para (i) above.
€ case of first nominated train as
-~-
rs
a a
wad WHR GOVERNMENT OF INDIA OS ‘2a Hae ~MINISTRY OF RAILWAYS
(aa at RAILWAY BOARD ) BBA) 9 fw
Ya wert, ag feet — 110 001, Farr
No. 2008/TC(FM)/10/12. Rail Bhavan, New Dethi-110001,dated 12.02.2009
General Managers, All Indian Railways. >
Sub: Running of Parcel Van (VP) coach vice Inspection Carriage as 25th
Coach in passenger carrying trains.
Ref: i) Railway Board’s letter No. 92/CEDO/SR/4/0 Pt.-I dt. 23.11.2006.
{ii} Freight Marketing Circular No. 16 of 2008 vide Board’s ietter No.
2008/TC(FM)/ 10/12 dated 07.11.2008 (iii) Board’s letter No. 2008/TC(FM)/10/12 dated 18.11.2008
The instructions contained in Freight Marketing Circular No. 16 of 2008 under
reference (ii) above and Board’s letter under reference {iii) above are modified and shall
be as follows:-
In passenger carrying trains running with 24 coaches, there is permission
to attach an Inspection Carriage as a 25 Coach as per the provision of Railway
Board circular under reference (i} above. '
It has now been decided that this provision shall be extended to include a
leased Parcel Van also. Therefore, henceforth the 254 Coach can be an Inspection
Carriage or a leased Farcel Van. The running of 24 + I Parcel Van (leased) will
however, be subject to concerned CME/CEE (depending upon traction) certifying
the adequacy of powering of train.
This issues with the approval of Board (MT, MM & ML). :
~
The revised policy guidelines are in supersession of previous instractions-issued ©
by Board under reference (ii) and (iii) above.
{ Sanjay Geel}
Director Freight Marketing
No. 2008/TC(FM}/10/12 Rail Bhavan, New Delhi- 110001, dated 12.02.2009
Copy to: .
Chief Commercial Managers, All zonal railways.
Chief Operations Managers, All zonal railways.
Chief Mechanical Engineers, All zonal railways.
Chief Electrical Engineers, All zonal railways.
CCRS, Lucknow for kind information,
Director, Indian Railways institute of Transport Management, (IRITM}, Manak AARON ED
Nagar, Lucknow.
PPS to CRB, ME, MT, MM, ML, FC, MS and Secretary/ Railway Board.
. AM(CE), AM(Mech.), AM(Elect.), AM(T), AM(C}, Adv,(Rates), Adv.L{RS), AM(L},
ED(Chg.}, EDME(Chg}, Dir.(Punct.)/Railway Board, New Delhi.
con
{ Sanjay Goel)
Director Freight Marketing
D a
dD Ya)
DEY PVD
))
a)
sired areata Government Of India aoa HATTA Ministry OF Railways
@adt ate) (Railway Board)
No. 2010/CEDO/SD/09 New Delhi, dated 02.12. 2010
The General Manager, Eastern Railway, Kolkata
Sub: Kumradol: Condonation for construction of new platform on new line having radius less than 875m at Kumradol halt station in connection with construction of new BG line between Manderhill and Dumka of Malda Division of Eastern Railway.
Ref : Your office letter no. W(3)591/11, dated 19.05.2010.
With reference to your letter referred above, sent through the Chief Commissioner of Railway Safety, Lucknow, the sanction of Ministry of Railways, Railway Board is here by communicated for Condonation for construction of new platform on new line having radius less than 875m at Kumradol halt station in connection with construction of new BG line between Manderhill and Dumka of Malda Division of Eastern Railway as shown in Form-XVII and drawings enclosed with above referred letter. .
poh Peg S24124 “
No. 2010/CEDO/SD/09 , _ New Dethi, dated 02.12. 2010 Copy forwarded for information to :
1. The Chief Commissioner of Railway Safety, Compound of DRM/NER, Ashok Marg, Lucknow -226001 w.r.t. his endorsement no. Q. 11012/06/2010.c-fa.. dated 01.07.2010. ,
2. The Commissioner of Railway Safety, Eastern Circle, 14, Strand Raad, (12 Floor), Kolkata - 700 001 wrt. his letter no. 7/9/VITI/09/251/H, dated 25.05.2010. -
2, C (atretras ware) O24 fey
CH NS. wg Ministry ©: ) ity
re oa ays 7,
COPY FO] Signature oe cccicce vos uosmses (i} Gen Mark ‘ e All Indian Railfyays (except Eastern Reilway)
(ii) Commissioner of Rai way Tery All circles (except Eastern Circle)
(iii) General Manager(Engg), Eastern Railway.
w“*
mN
nA aed MeabtTe Government Of India a er HATTA Ministry Of Railways ~ (Raat ats) (Railway Board)
m No. 2010/CEDO/SD/12 New Delhi, Dated 39-11-2010
~ The General Manager,
” South Central Railway, - Secunderabad. on
~ Sub: Chakur: Condonation of infringing gradients of 1 in 100 in connection with Home-FM track circuiting along with centralized operation of
“ points and upgradation of interlocking from Std-I te Std-III at ~ Chakur station in Vikarabad - Parli section of Secunderabad ~ Division of South Central Railway. "
of Ref : Your office letter No. W.573/Infringement gradients/CKX(W-11), : dated 03.11.2010 o™ .
vom Vide your letter referred above, Board's sanction has been sought for A Condonation of infringing gradients of 1 in 100 in connection with Home-FM
- track circuiting along with centralized operation of points and upgradation of ~ interlocking from Std-I to Std-III at Chakur station in Vikarabad - Parli _ section of Secunderabad Division of South Central Railway.
_ The above case has been duly forwarded by CCRS/LKO & CRS/SC Circle with . the following conditions :
* 1. Shunting on non-isolatéd lines must cease before the stip siding point is set for
- the main line during Reception of a train. —
fo 2. Before normalizing track instrument, Station Master must verify the complete
~ arrival of the train, irrespective of the fact whether he is getting audible
7 warning, which can arise due to reception of complete train or part thereof.
~ However, while processing the case, it is observed that the above conditions should
i be incorporated in SWR of Chakur and also Railway may clarify whether
. regrading (raising) towards Parli_end would not help the system in bringing
the gradient to 1 in 260, since Railway has shown inability in lowering of
* main line as well as loop line on economic consideration.
. Necessary action 1 may please be taken accordingly.
~ v
~ OK, - Ordre?
Bs aan /
: BT HP ey wd) Date of ‘teate wees
IN s - DONE “4 y \
YOY AED y
J Ys
PPS
DD
) i)
4 a)
“>
x TIT Meety Government Of India Fo AATAA Ministry Of Railways @ad ate) (Railway Board)
No. 2010/CEDO/SD/13 New Delhi, Dated 24 -11-2010
The General Manager, Southern Railway, Chennai.
Sub: Salem Jn.: Condonation of infringing gradients of 1 in 100 and 1 in 110 in connection with Gauge Conversion from Cuddalore Port Jn. (CUP-VRI- SA)- for proposed yard arrangements at Salem Junction of Southern Railway.
Ref : Your office letter No. W.573/7/41/Vol.III, dated 19.08.2010
Vide your letter referred above, Board's sanction has been Sought for Condonation of infringing gradients of 1 in 100 and 1 in 110 in connection with Gauge Conversion from Cuddalore Port Jn. (CUP-VRI-SA)- for proposed yard
arrangements at Salem Junction of Southern Railway, -
However, while processing the case, it is observed that the neither Railway nor CRS/CCRS have proposed any safety precautions to prevent accident as per note (a) below para 2 of Chapter II-Station yards (page 10) of Schedule I of IRSOD(8G) Revised,2004. .
Therefore, you are requested to kindly submit revised proposal through CRS/CCRS accordingly.
(arretres aaa} |" orlart ferterefafter goitrafiovenAdd dé
Copy to:
1. The CCRS, Ashok Marg, Lucknow-226001 wort. his endorsement no.Q.11017/02/2010-TW dated 11/11/2010,
2. The CRS/Southern Circle, Seshadri Road, Gandhinagar, Bangalore- 360009 w.r.t. his letter no. Q.11017/1/2010-11/SR/1396 dt.27.08.2010
aan cy ory é (Lx \V Isoue with Erciosure / Eg “ae Gea! aye Signature : see sesame cae ge
art a rag Pate of tssue.... ...
on secerwons essen
De ek
~
5 HTeA MewBIe Government OF India ea ATA Ministry Of Railways
at até) (Railway Board)
No. 2010/CEDO/SD/14 New Delhi, Dated 9, -11-2010
The General Manager, South Central Railway, Secunderabad.
Sub: Parli_Vaijnath: Condonation of infringing gradients of 1 in 150 in connection with Rail Terminal facilities for M/s India Cement Ltd., taking off from Parli Vaijnath station on Vikarabad end in Secunderabad division of South Central Railway.
Ref : Your office letter No. W.573/Infringements/Vol.I, dated 24.08.10
Vide your letter referred above, Board's Sanction has been sought for Condonation of infringing gradients of 1 in 150 in connection with Rail Terminal facilities for M/s India Cement Ltd., taking off from Parli Vaijnath station on Vikarabad end in Secunderabad division of South Central Railway.
The above case has been duly forwarded by CCRS/LKO & CRS/SC Circle with the following conditions :
1. In view of the steeper gradient of 1 in 150, the shunt signals controlling movement from yard to ISL siding and.vice-versa are interlocked with the shunt signals ahead to facilitate that the trains should not be stopped at shunt 18/shunt3.
2. Shunt movement from yard to ICL siding and vice-versa shall be allowed only when Parli-Ghatnandur block section is not occupied by any train.
3. Level Crossing No. 120 is interlocked with signals at Ghatnandur end and suitable action is taken by the Railways to man/operate the level crossing gate cutting across Parli to ICL siding line and Parli-Parbhani line.
However, while processing the case, it is observed that the above conditions should be incorporated in SWR of Parli Vaijnath .
Therefore, you are requested to kindly submit revised SWR of Parli Vaijnath with the inclision of above conditions at the earliest for further processing the case ,
Signature 7 re
amity at fafa Date of Issua wn. oie tee one
v aTTeT WRB Government Of India ea Katee Ministry Of Railways (at ats) (Railway Board)
No. 2010/CEDO/sR/27 New Dethi, dated 24.11. 2010
The General Manager, East Central Railway, Hajipur
Sub: Running of Self Generating Stainless Steel Variants Hybrid Coaches with LHB shell and ICF bogie on Pradhankhunta-Mughalsari (GC) and J hajha-Mughalsari (Main line) section of East Central Railway. Ref : Your letter no. W-8/552/CRS/SS/Hybrid Coach, dated 03.12.09,
In reference to above, sanction of Ministry of Railways, Railway Board is hereby communicated for running of Self Generating Stainless Steel Variants Hybrid Coaches with LHB shell and ICF bogie on Pradhankhunta-Mughalsarai (GC) Section at a maximum permissible speed of 130 kmph and on J hajha-Mughalsari (Main line) section at a maximum permissible speed of 110 kmph on East Central Railway or at sectional speed whichever is less subject to terms and conditions as given in RDSO's speed certificate and East Central Railway's Joint Safety Certificate, Track Certificate & other Certificates accompanying above referred letter and with Board's comments as under :
1. In case, any pneumatic spring has deflated, train speed should be restricted to 60 kmph till the coach is detached from the train,
2. A review is required to be carried out to assess the effect of noise & dust levels as passenger convenience/comfort at the end of season. 3. RDSO should evolve standards to be maintained for dust particles inside Non- AC Coaches & should also work on developing dust mitigating measure to
reduce the total dust values.
4. Sanetion is for running until one year. Review should be done after experience of next dry season of summer.
5. Mechanism for auto detection of spring pressure should be incorporated soon. Till then, TXR staff will escort these trains,
a,
Prem a (TST aS aap"
wrhort Rites slttrefveAad sé
¢ 5
d a
a
J Ade
PTAA
AVEDIEV
ODO DY
“3
No. 2010/CEDO/SR/27 New Delhi, dated 24.11. 2010
Copy forwarded for information to : L. The Chief Commissioner of Railway Safety, Compound of DRM/NER, Ashok Marg, Lucknow -226001 wrt. his endorsement no. Q. 16011/01/2009.- f., dated 2111.10,
The Commissioner of Railway Safety, Eastern Circle, 14, Strand Road, (12% Floor), Kolkata - 700 001 wrt. his letter no. 1020/Hybrid Coach/09/475/H, dated 10.12.09.
3. Director General, RDSO, Lucknow for information, He may take necessary action w.r.t. items mentioned above.
4. Executive Director Standards (Motive Power), RDSO, Manak Nagar, Lucknow- 226011, wrt. his letter no. SV.AS.ML, dated 03.08.09, 01.04.09 and 19.03.09.
NC, Cc Snore Ea
(HTeas aya) ge ufra, tad ate
Copy to :
(i) General Manager (Engg.), All Indian Railways (except East Central Railway)
(ii) Commissioner of Railway Safety, All circles (except Eastern Circle)
3)
2D oO) YD
PO VD DY
JCA
UD
f
te
Sad aaente GOVERNMENT OF INDIA Qe aca MINISTRY OF RAILWAYS
(2c BS RAILWAY BOARD)
No. 2010/CEDO/SR/26 New Delhi, Dated 16/11/2010
The Director Generaf, RDSO, Manak Nagar, Lucknow-226011. -
Sub: Running of BG-4-wheeler Self propelled Over Head equipment inspection Car, manufactured by M/s Phooiltas Tamper Pvt. Ltd. Patna over routes in Eastern Railway as mentioned in Joint Safety Certificate No. 20/2010.
While approving a case of Eastern Railway for Running of BG-4- wheeler Self propelled Over Head ‘equipment inspection Car, manufactured by M/s Phooltas Tamper Pvt. Ltd. Patna, Board (ML & ME) have desired that :
" Self propelled vehicles are infringing the IRSOD(BG) Revised,2004 by 0.9 mm. We may process for revision in the SOD for flange thickness”. —__ ,
RDSO may kindly take action accordingly.
CO one ~ erate gar) !1~
aortert Pree / fata sohPrater (en) Yeord as
Copy: The Executive Director /Track-I, RDSO, Manak Nagar, Lucknow-226011.
> os
~ Wad ater GOVERNMENT OF INDIA a ~ aa area MINISTRY OF RAILWAYS A ( FeTak @rs RAILWAY BOARD ) “ No. 2010/CEDO/SR/26 New Delhi, dated (¢.11. 2010
- The General Manager/Engg, A Eastern Railway, . , ‘ Kolkata |
c Sub: Running of BG-4-wheeler Self propelled Over Head ~ equipment inspection Car, manufactured by M/s - Phooltas Tamper Pvt. Ltd. Patna over routes in ~ Eastern Railway as mentioned in Joint Safety A Certificate No. 20/2010. - Ref: Your letter No. W(B)/552/13/Vol.11/4-Wheeler/SP/OHE/ ~ Phootas , dated 11.07.2010.
“~~
In reference to above, the sanction of the Ministry of Railway, a Railway Board is hereby communicated for for running Running Of BG-4-
wheeler Self propelled Over Head equipment inspection’ Car, yo
~ manufactured by M/s Phooltas Tamper Pvt. Ltd. Patna.over routes . ins Eastern Railway as mentioned in Joint Safety Certificate No. . om _ 2042010 at a maximum speed of 60 Kmph or sectional speed whichever is a . less subjected to terms and conditions as given in RDSO’s speed certificate
- and Eastern Railway’s Joint Safety Certificate, Track Certificate and other mo Certificates accompanying your above referred letter.
0 : CO 22.8 A BO ‘ . pi PS tied C8 (siete Ba) fA ator Presa /fifta guitar (a)
a No. 2010/CEDO/SR/26 _ New Delhi, dated IS .11. 2010 ~ Copy forwarded for information to :- " 1.° The Chief Commissioner of Railway Safety, Compound of DRM/NER, Ashok Marg, ~ Lucknow -226001 w.r.t. his endorsement no. aq, 13011/ 16/2010-af dated o 12.10.2010
~ 2. The Commissioner of Railway Safety, South Eastern Circle, 14, Strand Road, (12% * Floor), Kolkata - 700 001 wa.r.t. his fetter no. 3020/BG 4-Wheeler Inspection ~ car/703/H dated 17.09.2010. . 4. The Executive Director Stanandards (Motive Power), RDSO, Manak Nagar,Lucknow- ~ 226011, w.r.t. his letter no. MC/TW dated. 21.05.2010
‘ C22 :
Potten . . (rate aA)
~ : Copy to: . e (i) General Man jan Railways (except Eastern Railway)
al (ii) Commissiondr of Railway Safetyranil circ esjfexcent Eastern Circle} nistry Of Vsilwayg
tg ats
\
La
ard
;
i ay .
Issue Wil inotcsure AAA oa? th alas enna
Signature SEI UIDN ber ves uae ae ane was 4S” TP L210 le Wpr- 9 Die rT me
_ Date of Issue ..., see eeeen ae
~
Yuasa
3)
J YY
oy
a a
a) TAP
“3
smael Bexar] GOVERNMENT OF INDIA 2 aisiea MINISTRY OF RAILWAYS
(2ea GS RAILWAY BOARD ) No. 2010/CEDO/SR/15 New Delhi, dated #5 .11. 2010
The General Manager/Works, - Central Railway, Mumbai C.S.T.
Sub: Running of BG 8 wheeler self Propelled diesel electric Jet Defiector Crane Car (JDCC) upto a maximum speed of 95 kmph with a maximum axle load of 18.0t under gross laad condition on all BG sections of Central Railway. ,
Ref: Your letter No. W/681/Y.115/BR/I, dated 30.10.2007.
in reference to above, the sanction of the Ministry of Railway, Railway Board is hereby communicated for for running of BG 8 wheeler self propelled diesel electric Jet Deflector Crane Car (JDCC) with a maximum axle load of 18.0t under gross load condition on ail BG sections of Central Railway at a maximum speed of 95 Kmph or sectional speed whichever is less subjected to terms and conditions as given in RDSO’s speed certificate and Central Railway's Joint Safety Certificate, Track Certificate and other Certificates accompanying your above referred letter.
2 (aTretre PAR) bribes a
ator! Preas /fafra goitPrafer (ar) Yord are -
*
No. 2010/CEDO/SR/15 , New Delhi, dated/5 .11. 2010 Copy forwarded for information to :- '
1. The Chief Commissioner of Railway Safety, Compound of DRM/NER, Ashok Marg, Lucknow -226001 w.r.t. his endorsement no. aq, 13011/ 07/2007-af&. dated 17.03.2010
: The Commissioner of Railway Safety, Central Circle, 24 Floor, Churchgate Stn. Bldg. Annexe, M.K. Road, Mumbai-400 020, w.r.t his letter no. C-11(123}2007-509 dated 12.11.2007.
3. The Sr. Ex. Director Stanandards (Motive Power), RDSO, Manak Nagar,Lucknow-226011, w.r.t. his letter no. MC/DRDO/SP dt. 28.04.06
J Da, (rete GAR) Irs
wd ufaa, Yord ars Copy to: ;
(i) General Manager (Engg.), All Indian Railways (except Central Railway} (ii) Commissioner of Railway Safety, All circies (except Central Circle)
Ct wry
Minisiry f° sys cc a
Barey board
ai aiae ea Tet
6 Issuo with Enclosure l I)}2010 acai?
Signature .. -.
ary ay fafa
Date af Issue. cece. oe
3 *s
A eye
JO
8) d
‘ 2)
a a
ae) oy
odd
? ‘J
Wat aac GOVERNMENT OF INDIA 2a data MINISTRY OF RAILWAYS
(Jaa Ws RAILWAY BOARD)
No. 2010/CEDO/SR/25 New Dethi, Dated 04-11-2010
The Director General/Track, RDSO, Manak Nagar, Lucknow-226011. -
Sub: Condonation of infringement to IRSOD by 3 coach High speed Self propelled accident Relief train (HS SPART) with two power packes manufactured by, ICF, Chennai.
Ref: Your office letter No. CT/DDL/DMU, dt: 20.08.2010
Vide your letter referred above, Board’s sanction has been sought for Condonation of infringement to IRSOD by 3 coach High speed Self propelled accident Relief train (HS SPART) with two power packes manufactured by, ICF, Chennai. ,
However, while processing the case, AM(CE) has not agreed for any infringements to MMD.
Necessary modification to designs may be done by RDSO accordingly.
. G Jie
(arse EAR) orton freee /fefte sotPrafer (a)
era arg Ag
tii a T FI
Ministry OF Vailvays Req ate
. Rallwsy Board
Tamas Slee aA ab I i
gems” with Endlesure
Signature ..._.. arate Re
Date of Issue ...,
PSY
YoPryoHN
Y ‘Y
3
§$22)- 6
Mad atlathley GOVERNMENT OF INDIA Wa daca MINISTRY OF RAILWAYS
(aaa BS RAILWAY BOARD)
No. 2010/CEDO/SR/11 New Delhi, Dated 04-11-2010
The Director General/ Track, RDSO, Manak Nagar, Lucknow-226011.
Sub : Condonation of infringements to Indian Railway (BG) Schedule of Dimensions Revised, 2004 for EOG Air Conditioned Double Decker Coaches manufactured by RCF, Kapurthala .
Ref: Your office letter No. CT/CONTR/BG/ MG, dt: 12.06.09
While processing a reference from Eastern Railway wherein they have referred the issue of 75 kmph speed restriction on running of Double Decker AC stock over platform lines as mentioned in Board’s letter of even number dated 11.05.2010, AM(CE) has desired to know :
1. Basis of stipulation given in para 6 of your above referred jetter
(as mentioned below) .
(i) Minimum clarance of 150 mm to 225 mm beyond kinematic
proftie for operation of these coaches at speeds upto 75 | kmph. , .
qi) Minimum clarance above 225 mm beyond kinematic profile
for operation of these coaches at speeds beyond 75 kmph.
2. Is kinematic profile & MMD same? If not , give details.
RDSO may kindly arrange to send the above clarifications immediately for
Td Tos
eae O : wT Ss
Gg vou Enoles
rN
o~ MIA Waa GOVERNMENT OF INDIA ‘ A 2a daca MINISTRY OF RAILWAYS a (Ferd BE RAILWAY BOARD )
No. 2007/CEDO/SR/11 New Delhi, dated 03.11.2010 ~
A The General Manager/Engg., ~ ~ East Central Railway,
a Hajipur
7 Sub: Running of BG Brake van type BVZC at speed of 100 a kmph on proposed BG sections of E.C. Railway. ~ Ref: Your office letter No. W-8/552/CRS/BVZC/856 dated 07.10.10.
With reference to your jetter referred above, sent through ~ CCRS/LKO, the sanction of Ministry of Railways, Railway Board is hereby communicated for extension of validy for one year (i.e. upto 31.10.2011) for Running of BG Brake van type BVZC at speed of 100 kmph on ~ Proposed BG sections of E.C. Railway or at speeds not exceeding ° those proposed by RDSO in their Speed Certificate and in East Central ~ Railway’s Joint Safety Certificate, Track Certificate & Bridge Certificate or - maximum sectional speed whichever is less and further subjected to the restrictions/ conditions as given in above Certificates.
° 2A. * (anette aga)” ‘ arent freee /faftea gehPrafhr (ar) . . rad arg - No. 2007/CEDO/SR/11 New Delhi, dated 03.11.2010
Copy forwarded for information to: - 1. The Chief Commissioner of Railway Safety, Compound of DRM/NER, * Ashok Marg, Lucknow -226001 w.r.t. his endorsement no. # 15013/
01/98-a.fa. dated 25.03.2009 2. The Commissioner of Railway Safety, Eastern Circle, 14,Strand Road, 12™ Floor, Kolkata-700 001 w.r.t. his letter no. #4, 1020/BVZC/08/ 237/H . dated 17.09.2008
5 3. The Executive Director(Motive Power), RDSO, Manak Nagar, Lucknow 1 w.r.t. his letter no. MW/BVZC, dated July’2000 :
wy a ee Feat C2 a ‘ ¥i
‘ly. ‘yp AYGS a (aneite ear) *""" ~~ = % ee ga edt ae ubra~tead ad . ty Copy to ea: Psuc uh incosure
Bberal Manager (Engg.), Al Indian Railways (except East Centra Railway) emmisplonier of Railway Safety, All circles (except Eastern Circle) + Ejsda
ee
~~
i —t
'
yi Be
‘ } ae DY +
v Psyeeyed
Sey
f a)
saa BzeHTT GOVERNMENT OF INDIA ~ Jet saree. MINISTRY OF RAILWAYS (3erad WE RAILWAY BOARD )
No.~2007/CEDO/SR/11 New Delhi, dated 03.11.2010
Chief Commissioner of Railway Safety Compound of DRM/NER, Ashok Marg, Lucknow -226001
Sub: Running of BG Brake van type BVZC at speed of 100 kmph on proposed BG sections of E.C. Railway.
Ref: Your office letter no. FZ. 15013/ 01/98-af8. dated 25.03.09
The information desired vide your letter referred above is furnished below for your kind consideration: -
1. Total sanction avaitable under RSP for BVZI type wagon are as under : Year RSP Supply 2008-09 700 316 2009-10 760 768 2010-11 475 326(upto 30.9. 10)
2. Present holding of BVZI is 1410 as on 31.07.2010
3. BVZls are the only type which are now manufactured. These are distributed to | various Railways as per traffic requirements and run as per day to day Operational needs.
o — 2.0, | Le (arate |Ar) \ w orient Peers / fatter gohrafer (a) NY
de " Copy to:
EDME(Fr) and EDRS/S for information.
oye
Y a)
aa BXATT GOVERNMENT OF INDIA AAAI MINISTRY OF RAILWAYS
(zoe Bs RAILWAY BOARD )
No. 2810/CEDO/SD/05 New Delhi, Dated 02.11.2010
The General Manager(Engg), East Coast Railway, HQ. Office, Bhubaneswar-751 023.
Sub: Bacheli: Condonation of infringing gradient of 1in80 in connection with proposed uniflow dispatch line at Bacheli on K-K jine under Visakhapatnam Division of East Coast Railway.
Ref: Your office Letter No CE/C/1/BBS/NMDC/Bachell/50A, dt. 19.5.08
With reference to your letter referred above, sent through the Chief Commissioner of Railway Safety, Lucknow, the sanction of Ministry of Railways, Railway Board is here by communicated for Condonation of infringing gradient of 1in80 in connection with proposed uniflow dispatch line at Bacheli on K-K line under Visakhapatnam Division of East Coast Railway as shown in Form-XVII and drawings enclosed with above referred letter.
ote orient Presa / fife gofPraftt ar)
No. 2010/CEDO/SD/05 New Delhi, Dated 02.11.2010 Copy forwarded for information to:
(i) The Chief Commissioner of Railway Safety, Compound of DRM/NER, Ashok Marg, Lucknow -226001 w.r.t. his endorsement no. €. 11017/01/2010-a fa. dated 21.04.2010
(ii) The Commissioner of Railway Safety, S.E. Circle, 14, Strand Road, 12% Floor, Kolkata ~ 700 001 w.r.t. letter no. 1481 dated 10.03.2010
FLPAV VSD
DY OD
A yas
thoes On
J YA}
49
ny.
i)
13
! “OF
SILA WepIT 2a AAAs
No.2010/CEDO/ORI/15 New Delhi, dated % .10.2010
The Chief Administrative Officer (Const.), Eastern Railway, Secunderabad.
ferver:—Opening of new double line from Khamargachhi- Tribeni station (Km. 8.200 from BDC) in connection with doubling between Bandel and Jirat stations of Howrah Division of Eastern
Railway. ,
aaat:-—-Your letter No.. CAOQ/CON/W/1967/CRS/167 — dated 24.09.2010.
hh
With reference to your letter referred above, it is mentioned that CRS Inspection Report dated 10.06.10 and authorization letter have not been received in Board office.
You are requested to send copies of CRS Inspection Report dated 10.06.10 alongwith authorization letter to this office for communicating the approval of the opening of the section by the Board.
<< 23 oe Giota rei
arefarst ferderen ef-s. att.
Copy to: (i) The Commissioner of Railway Safety/Eastern Circie, Kolkata w.r.t, his letter No. 10/I/V/10/318 H dated 10.06.10.
(ii) The Chief Commissioner of Railway Safety, DRM, NER Compound, Ashok Marg, Lucknow for information please.
, clan Ce
gee —
Date wi Issna... . eee sonal
Pd
Cb oye”
i)
SiG ou Sma Brean] GOVERNMENT OF INDIA po ot sate MINISTRY OF RAILWAYS ol
(qaad ars RAILWAY BOARD)
No. 2009/CEDO/ SD/02 '» New Delhi, dated 22.09.2010
The General Manager/Engg., Central Railway, Mumbai CST-400001
Sub: Pune-Replacement of Signalling gears with centralized operation of points and Signals-Condonation for horizontal
clearance for retention of existing signals in the yard.
Ref: Your office Letter No N 107/PA/RRI/2002-03/N/III, dt.20,.11.07.
Kindly refer to Board’s letter of even no. dated 09.03.2009 and
followed by reminder dated 16.12.2009 ( copy enclosed) wherein you were
requested to send following clarification/documents for processing the above
cited case :
(i) ESP & SWR of PUNE yard/station.
(ii) Type of rolling stock running through Pune yard, any running of
wider stock.
(iii) Necessary precautions taken for running/movement of ODC.
It is regretted to note that above information is still awaited from your
tely otherwise intimate !f the condonation
A le DA: as above
(rare BAR)
artare Pree / fata sora (a) vad are
end, Kindly send the same immedia
is required or not.
This may be treated as MOST URGENT.
ane
YING UT GOVERNMENT OF INDIA Yo ARTA MINISTRY OF RAILWAYS
(tard ate) (RAILWAY'BOARD)
No.2007/CEDO/SR/8 New Delhi, dated 28; 9.2010
The General Manager (Engg.), South Eastern Railway, Kolkata,
(Kind Attn, Sh. S.K. Choudhury, Dy.CME/Fr.)
Sub: Sanction for running of 2032t axle load BG Bogie Rail Wagon type “BRSTN” for Ministry of Defence.
Ref: SE Rly’s letter No.M6/2007/W/Defence/477 dated 14,9,.2010.
As desired vide your above referred letter, copy of the sanction letter No.2007/CEDO/SR/8 dated | 1.5.2007 is enclosed for ready reference.
Please acknowledge receipt.
Je Cc 2a (aneites gary”
DA/As above retErt Preereaa.g. (.)
Oya?
y
“y
‘J
D+}
‘ :)
GOVERNMENT OF INDIA (BHARAT SARKAR) MINISTRY OF RAILWAYS (RAIL MANRALAYA)
RAILWAY BOARD
No. 2010/CEDO/ORI/14. New Delhi, dated } § 09.2010
The Chief Engineer/C-lv, South Central Railway, Head Quarters (Con) Branch, Secunderabad.
Sub: Submission of CRS/SC’s Circle Inspection Report Lr, No.R.12038/02/2007-SCC/342 dt 07.08.09, on Opening of Railways - Guntur — Krishna Canal Doubling Project - Opening of the newly taid Electrified Double Line between Krishna Canal - Mangalagiri in Guntur Division of south Central Railway for Public Carriage of Passengers.
Ref: Your Lr. No. W.Con.347/B/152/KCC-MAG dt. 04.08.2010
With reference to ietter quoted above, compliance report of your Railway on the subject has been received without, CRS, South Central Circle’s Inspection Report in original.
It is therefore, requested to please submit in original the CRS/SC Circle’s inspection Report on the above subject at the earliest to Board's office, for further processing.
Ofc ( Alok KumanyYy & Executive Director Civil Engg.(G),
Railway Board.
Lt
ok - aa
6 = a
aa yay)
D re
a ee)
Odd
Syd
ay
3 DD
i)
TAP
Ded
6d
vd DD
od
‘A
14
42D
at
oe Ke \ er ©
No. 2007/CEDO/ SR/11
FILA ASIF Government of India 2a Warra Ministry Of Railway
(tad std Railway Board )
New Delhi, dt 10- The General Manager(Engg), East Centra] Railway, Hajipur.
speed of 100 kmph on Proposed BG sections of East Central Railway.
Sub: Ruanjng of BG Brake van type BVZC at speed of
09-2010
100 kmph_ on proposed BG sections of East Central Railway. Ref: Your office letter no. W-8/552/CRS/BV2C dt.09.1 2.09
Vide your office fetter referred above and CRSE/ECR letter, CCRS & CRS forwarding letters have been received as enclosure with EDME(Fr.) note wherein you have requested for early sanction for Running of BG Brake van type BVZC at speed of 100 kmph_ on Propased BG sections of East Centra! Railway Running of BG Brake van type BV2ZC at
However, while examining the case it is observed that follwing documents are further required for processing the case which
have not been recéived with your letter dt. 09.12.2009 - S.N. | Documents
| 1 Joint Safety Certificate | 2, Track Certificate
3. Bridge Certificate | 4, Rly Board's letter no. 75/WDO/SR/19 dt. 21.11.1975 5. Form XVII & RDSO drawing 6. RDSO speed certificate
7. Check list
East Central Railway further processing the case.
is requested to send the above documents for
ole. — 20, pea Meat BAT) (
ardor Preys / fer gut
aun t Where Wats ¢
rarer Gay) ta q ar
“ _ oN
‘
~ sitd UH Government Of India
_ > ta Hare Ministry Of Railway a (tad até Railway Board )
- No. 2010/CEDO/SR/23 New Delhi, dated 08.09.2010 A The General Manager/Engg,
Southern Railway, co Chennai.
“~ Sub : Running of 6-axle bogie covered special wagon type “BCLM” ° over various section of Southern Railway at a maximum
cs speed of 40Kmph, both in empty and loaded condition. ~ Ref : Your office letter no.W.439/4/BCLM , dated 27.05.2010 .
wuss
~ With reference to your application referred above, sent through the CCRS, Lucknow, - Sanction of Ministry of Railways, Railway Board is hereby communicated for Running of on
-axle bogie covered special wagon type ‘BCLM” over various sections of oO Southern Railway at a maximum speed of 40Kmph, both in empty and
joaded condition subject to terms and conditions as given in RDSO’s provisional speed
~
: certificate and Southem Rly's Joint Safety Certificate, Track Certificate and other Certificates -~ accompanying with your above referred letter.
cs ~~ . Se (rei aA) ~
o~ wre Freee /fiita goiter cea.) ~ Yad ars , No. 2010/CEDO/SR/23 New Delhi, dated 08.09.2016 om
. Copy forwarded for information to :- cf 1. The Chief Commissioner of Railway Safety, compound of DRM/NER, Ashok
Marg, Lucknow - 226001 w.r.t. his endorsement no, wy, 1304.1/13/2010- -_~
aoftto dated 20.07.2010
o 2. The Commissioner of Railway Safety, Southern Circle, 7, Seshadri Road, Gandhinagar,Bangalore-560009 wa.r.t. his endorsements no.Q.16017/13/
v 2010/SR /738-739, dated 20.06.2010 ce 3. The Executive Director Standards (Motive Power), RDSO, Lucknow, wrt. his letter
a no. MVW/CS/BCLM, dated 08.07.2008 a
. ee UV (rete BAR) mn & o Ge ad, tard ats ~ SZ Copy to:
. . ri ald {i} General Manager (Engg.), All Indian Railways (except Southern Railway) -s wn 0 (ii) Commissioner of Railway Safety, All.circles (except Southern Circle} “at XN ‘ Peng
a 9 oma r* Cc noe oa
m
3
a Hea AtHie Government Of India % ta Haag Ministry Of Railway _
(tad sted Railway Board )
No. 2010/CEDO/SD/08 New Delhi, Dated 31.08.2010
The General Manager(Enggqg), Eastern Railway, Kolkata.
Sub : Andal : Condonation of infringing gradients of 1 in 200 and 1 in 205 in connection with By-pass line connecting KIME-UDL Jn. Cabin to SCN at Andal yard in Andal-Kajoragram section of Asansol] — Division of Eastern Railway.
Ref : Your office letter no. W(3)591/4Vol,-III, dated 24.06.2010 eeenae
With reference to your letter referred above, sent through the Chief Commissioner of Railway Safety, Lucknow, the sanction of Ministry of Railways, Railway Board is here by communicated for Condonation of infringing gradients of 1 in 200 and 1 in 205 in connection with By-pass line connecting KJME-UDL Jn. Cabin to SCN at Andal yard in Andai- Kajoragram section of Asansol Division of Eastern Railway as shown in Form-XVII and drawings enciosed with above referred application.
% J 2c, ( siete @enez )
ac arfort fread t.rad ad
No. 2010/CEDO/S?/08 New Delhi, Dated 31.08.2010
Copy forwarded for information to: 1. The CCRS, Ashok Marg, Lucknow w.r.t. his endorsement no. wa, 12012/07/2010-
aoito dated 01.07.2010 2. The CRS/Eastern Circie, 14, Strand Road, 12" floor, Kolkatta-01 w.r.t. his letter
no. 1/11/VIII/10 /infringement/348/H dated 29.06.2010.
Hattie
me
ce
et
ba
se
HRT Were Sa Aaa Gora ars)
NO. 2010/CEDO/SM/1 New Delhi, dated 24.08.2010
The Principal Chief Engineer, East Coast Railway, Bhubaneswar, Eastern Railway, Kolkata, Western Railway, Mumbai.
forrea: System Maps WER: i) This office letter No. 92/CEDO/SM/1 dated 11.2.1992. ii) Board's letter of even number dated 12.05.2010 and 03.08.2010.
As per letter dated 12.05.2010, the System Maps updated and corrected as on 31” March 2010 of your Railway were to reach Board's Office by 31° July 2010, but the Same is still awaited from your Rai lway even after 1 month.
You are advised to look into this inordinate delay and take necessary steps to send the system maps timely to Board in future.
oe (sirefres agar) *” ”
oBretaprat fareeras att & chr. "Gam arg)
= —_ ‘srerat atacia GOVERNMENT OF INDIA Ta i Yar daica MINISTRY OF RAILWAYS
(aad Bs RAILWAY BOARD )
RoreEDO/sR/ 26 New Delhi, dated 21.08. 2009 Baroda Ho o
~ se, New Delhi.
~ ay ‘Sub: Running of BG Bogie covered auto car modified wagon type Cee _.. BCACM - wagons having maximum Axle load of 8.28t loading
re on nominated routes of Northern Railway. ~ Ref: Your office letter No. 519-W/938,dt: 12.08. 2008
. | In reference to above letter, the sanction of the Ministry of Railways,
~ _ Railway Board is hereby communicated for Running of BG Bogie covered |;
~ auto car modified wagon type BCACM wagons having maximum Axie
load of 8.28t loading on nominated routes of Northern Railway
~ subject to terms and conditions as given in RDSO’s Provisional Speed _ Certificate and Northern Railway’s Joint Safety Certificate, Track Certificate
. and other Certificates accompanying above referred letter. ~ The sanction is further subjected to the recommendations/suggestions made by
CRS/Northern Circle! New Delhi and CCRS/LKO vide their letters No.Q-15/BCACM/07- ~ O8/NC/717-719 dt. 27.08.2008 & No @,15013/03/2008- aoftro dt. 06.08.2009
~ respectively
to al ~ .
( T.Gupta )
sO C- Executive Director Civil Engg.(G) ~ Railway Board.
NO. No. 2009/CEDO/SR/26 New Delhi, dated 21.08. 2009
Copy forwarded for information to:
~ 1. CCRS, Compound of DRM/NER, Ashok Marg, Lucknow -226001 w.r.t. his ~ endorsement No. @2,15013/03/2008- cofto dt. 06.08.2009
2. The CRS/Northern Circle, CRIS complex, Chanakyapuri, N.Detni-21 w.r.t. his
~ letter No. @-15/BCACM/07-08/NC/717-719 dt. 27.08.2008
3. The Executive Director Standards (Motive Power), RDSO, Lucknow, w.r.t. his
letter No. MW/Autorack, dt. 28.04.2008.
~ . a” \ _crbuptay — om, a Bann or Secretary, Railway Board. okt Aisl7y a ‘ind wd
ere aa
SOMA SAS AB TRE
a
Me
RIFT WHIT GC fF
ea AAA @aa ars)
No. 2010/CEDO/ORI/4. New Delhi, dated Ae .08.2010
The Chief Commissioner of Railway Safety, DRM NER Compound, Ashok Marg, Lucknow-226001.
facra :Opening of newly constructed BG line from Tollygunge station
(Km. 16.474) to Briji station (Km. 24.411) in connection with + — the extension of existing Metro Railway Kolkata from
Tollygunge station to New Garia station Km. 25.233 (8.759
Km.) for public carriage of passenger traffic.
west : (i) CRS's (NF. Circle) letter No. R 3601/1/2009/dated 16.10.2009
The approval of Ministry of Railways is hereby communicated to the recommendation of Commissioner of Railway Safety, N.F. Circle, Kolkata for
opening of the above section for public carriage of passengers as per his letter
No. R 3601/1/2009/dated 16.10.2009.
yee
6 C wpretaatat fareeren att Soft.
(ora ars)
No. 2010/CEDO/ORI/4. New Delhi, dated Qo .08.2010
Copy forwarded for information to:
(i) The Commissioner of Railway Safety, NF. Circle, 14, Strand Road (12"" Floor),
Kolkata-700001, w.r.t. his letter R 3601/1/2009/dated 16.10.2009,
(ii) The Chief Engg., Metro Railway/Kolkata, Metro Rail Bhavan, 33/1, J.L. Nehru
Road, Kolkata -700071.
(iii)The General Manager, Metro Railway, Kolkata.
) )
» >)
) “>
> 2
DD
> J)
) J
) “2
0)
ata AzSie Government Of India
ta area Ministry Of Railway (tad até Railway Board )
No. 2010/CEDO/SR/22 New Delhi, Dated 20.08.2010
The Director General /Track, RDSO, Manak Nagar, Lucknow-226011.
Sub: Condonation of infringement to IRSOD by Ballast Regulating Machine Model RPB 01, manufactured by M/s Metex, JSC Mascow.
Ref : Your office letter No. CT/MM/GENL, dated 31.05.2010
With reference to your application referred above, sent through the CCRS, Lucknow, the sanction of Ministry of Railways, Railway Board is hereby communicated for Condonation of infringement to IRSOD by Ballast Regulating Machine Model RPB 01, manufactured by M/s Metex, JSC Mascow.
The design of this Ballast Regulating Machine Model RPB 01, infringes clause No. 9 & 12. of Chapter-IV(A) of IR B.G. Schedule of Dimensions, Revised, 2004 as per Annexure-I , drawings & other details accompanying with your above referred letter .
Oy
( sneites Bar ) DA)
aeart Reena ctrcd a
No. 2010/CEDO/SR/22 New Delhi, Dated 20.08.2010
Copy forwarded for information to the Chief Commissioner of Railway Safety, Compound of DRM/NER, Ashok Marg, Lucknow -226001 w.r.t. his endorsement no. #, 17012/07/2010-afa,, dated 09.06.2010.
co An apa afta, tad ats
Copy to: (i) General Manager (Engg.), All Indian Railways. (ii) Commissioner of Railway Safety, All circles, *
oy - Ole ( x2
ey yd
‘)
3 ?
) 20)
xIga wReHTY Government Of India
ga AaAtaa Ministry Of Railway (aa até) (Railway Board)
No. 2010/CEDO/SD/05 New Delhi, Dated 09.08.2010
The General Manager (Engg.).
East Coast Railway Bhubaneswar.
Sub : Bacheli - Condonation of infringing gradient of 1 in 80 in connection
with proposed uniflow dispatch line at Bacheli on X-K line of
East Coast Railway.
Ref : Your office letter no. CE/C/I/BBS/NMDC/Bacheli/50A, dated
19.05.08.
Vide your letter referred above, Board's Condonation has been sought for
infringing gradient of 1 in 80 in connection with proposed uniflow dispatch line at
Bacheli on K-K line under Visakhapatnam Division of East Coast Railway.
However, while processing the proposal, it observed that following
clarifications are further required from the Railway :
(i) Cross-over at the North end is near 8° curve. Its location on
curved/transition portion should be examined and commented upon
w.r.t. IRSOD.
(ii) Why can gradient of 1 in 80 not be eased out by the Railway - reasons
thereof ?
(iii) Approval of Railway Board has to be processed before starting of
work, Current status of work to be commented upon. If work is already
in final stages, responsibility needs to be fixed up by East Coast
Railway for the failure in taking approval of Railway Board before
commencement of work
E€oR may kindly arrange to send the above clarifications for further
processing of the case in Board.
Suh, ( ; yowesie
refer Pterpatg.at. Aca as
‘)
do)
yep
oS
) )
yi
oD
: ) : )
Hizd AHS
ta Aaa
Qed ats)
No.2010/CEDO/ORI/10 New Delhi, dated q 08.2010
The Chief Administrative Officer (Const.),
N.F.Railway, Maligoan,
Assam.
fast :Opening of Senchoa Jn- Silghat Town (61.44 Km) Section,
newly constructed BG Line on restoration and conversion of MG
line into BG as an addition to Lumding -Dibrugarh Town (628
Km) gauge conversion project in Lumding Division, NF. Railway
for public carriage of passengers.
sizef : Your letter No. W/260/CON/SCE-SHTT dated 21.07.2010.
RK
With reference to your letter referred above, it is mentioned that CRS
Inspection Report dated 17.10.2008 and authorization letter have not been received in
_ Board of fice.
You are requested to send copies of CRS Inspection Report dated 17.10.2008
alongwith authorization letter to this office for communicating the approval of the
opening of the section by the Board.
BT PF
CS 09, loncites gare)
We artes Biter sa
Copy to: (i) The Commissioner of Railway Safety/NF, Circle, 14- Strand Road, (12
Floor), Kolkata-700001 w.r.t. his letter No. R 12036/02/2008/763 dated 17.10.08.
(ii) The Chief Commissioner of Railway Safety, DRM, NER Compound, Ashok Marg,
Lucknow for information please a onsen
1
ora)
3 L274
Jer pumy
')
52
'D
“2D
0)
Vy
ye
AN PDD DDD
‘9
ed )
“)
2 »0)
Wed Qatar GOVERNMENT OF INDIA Qa dares! MINISTRY OF RAILWAYS (3a BS RAILWAY BOARD )
No. 2010/CEDO/SR/24 New Delhi, dated 05.08.2010
The General Manager/Engg, Eastern Railway, Kolkata & Southern Railway, Chennai.
Sub: Running of 3- Coach BG Self-Propelled Accident Relief Train (SPART) on various sections of Eastern and Southern Railway at a maximum speed of 105 Kmph.
Ref: (i)Eastern.Rly’s letter no.W(8)/522/13/Vol.II/SPART(3-Coach) dt. 16.4.10 {ii)Southern Riy’s letter no.W.439/4/69 dt.19.03.10
In reference to above, the sanction of the Ministry of Railways, Railway Board is hereby communicated for Running of 3- Coach BG Self-Propelled Accident Relief Train (SPART) on various sections of Eastern and Southern Railway at
a maximum speed of 105 Kmph subject to terms and conditions as given. in
RDSO's speed certificate and Eastern/Southern Rly’'s Joint Safety Certificate, Track
Certificate and other Certificates accompanying above referred letters as the case
may be. \
a Oe aus
Qala BAR) arate Freer /Pafea scare (ar)
Vara ars
No. 2010/CEDO/SR/ 24 New Delhi, dated 05.08.2010
Copy forwarded for information to :- 1. The Chief Commissioner of Railway Safety, compound of DRM/NER, Ashok
Marg, Lucknow - 226001 w.r.t. his endorsement no.wy13011/14/2010-
aofto dt. 22.10.2010 ( two letters) 2. The Commissioner of Railway Safety, Eastern Circle, 14, strand Road,
(12 floor), Kolkata-700 001 w.r.t. his endorsements no.1020/Accident relief train(SPART)/10/375/H dt. 01.07.10
3. The Commissioner of Railway Safety, Southern Circle, 7, Seshadri Road, Gandhinagar,Bangalore-560 009 w.r.t. his endorsements no.Q.16011/5/ 2010/SR /839-840, dt. 01.07.2010
4r, The Executive Director Standards (Motive Power), RDSO, Lucknow, w.r.t. his letter KTR preggo at. 03.09.2009
a. ae . ir vaya 2. eda Qe oa,
Ye (sie ds eb HAN) “Ea vias eer ae \ PS eg ero ©
qneral Mapager (ENGG-7, AW Indian Railways (except Eastern & Southern Railway) igalgner of Ballway nf ety, All circles (except Eastern & Southern Circle)
PRG Pe
PED
i}
a a
} }
7 a
ty
atic aoa rey
aa axa @aet ars)
No. 2009/CEDO/ORI/4, New Delhi, dated 4 .08.2010
The Chief Commissioner of Railway Safety, DRM NER Compound, Ashok Marg,
Lucknow-226001,
farer : Opening of Katihar-Mukuria (34.61 Km) on conversion from MG to BG a part of Katihar-Jogbani including Katihar-Barsoi and 8arsoi-Radhikapur (195.48 Km) gauge conversion project in Katihar Division of NF Railway for public carriage of passenger.
wee ={i)CRS's (N.F. Circle) letter No. R. 12036/3/2007/147 dated 30.04.2008.
The approval of Ministry of Railways is hereby communicated to the recommendation of Commissioner of Railway Safety, N.F. Circle, Kolkata for opening of the above section for public carriage of passengers as per his letter No. R. 12036/3/2007/147 dated 30.04.2008.
28a (sitefias apart’) 9
a mritapret fareeran ait Spahr,
Cc Gere ard)
No. 2009/CEDO/ORI/4. New Delhi, dated 4 .08.2010
Copy forwarded for information to:
(i) The Commissioner of Railway Safety, NF. Circle, 14, Strand Road, (12 Floor), Kolkata-
700001, w.r.t. his letter No. R. 12036/3/2007/147 dated 30.04.2008,
{ii} The Chief Administrative Officer (Const.), N.F Railway, Maligaon, Guwahati, (iii) The General Manager (Engg), N.F. Railway, Maligoan, Guwahati.
Anger ver ee CI dsee,
i va a . "7 Bnietry Of ne, . me ee (Seton apatite’)
o a Xeiey Board aBet afd eta avé pee, (n i art a are a A cheecery eg 0 peal ae eT Banu re -
5 aif) 4 \ 1 ute clr os,
a eer
} oD
Vir?
Higdt ARHIR
aa AAA
aa ars)
NO. 2010/CEDO/SM/1 New Dethi, dated o}.08.2010
The General Managers (Engg.),
East Coast Railway, Bhubaneswar,
East Central Railway, Hajipur,
Eastern Railway, Kolkata,
Northern Railway, New Delhi,
West Central Railway, Jabalpur,
Western Railway, Mumbai.
fame: System Maps
MEH: i) This office letter No. 92/CEDO/SM/1 dated 11.2.1992.
ii) Board's letter of even number dated 12.05.2010.
As per letter dated 12.05.2010, the System Maps updated and corrected as on
31°* March 2010 of your Railway were to reach Board's Office by 31° July 2010 but it is
seen that same is still awaited from your Railway.
You are again requested to send 25 copies each of the coloured System Maps of
Size A-O (duly folded neatly in a cover), 25 copies of Size A-4 and 10 copies of the
Time Table Maps(Five Plain and Five Showing the Divisional J urisdiction)up dated and
corrected as on 31.3.2010 to Board's Office latest by 20.08.2010 because it is
frequently required by MR's Cell and Board Members for their use and reference.
Tt may please be ensured that the System Maps have been prepared strictly in
accordance with instructions contained in the letter quoted above. Also in future, you
are requested to send these maps to Railway Board by 31° of July every year.
ne
(arraivas qa) 03 fois
Di wetetontett farearen att S/T.
C gorty ar8) Copy to: -Principal Chief Engineers-ECOR, ECR, ER, NR, WCR & WR for information.
|
i>
.3
Paap
ed
a
PPV
FevuyV
ey
iD
TY
CZ 19
67
43
) Ee
SV ab
grad arama GOVERNMENT OF INDIA Yar Bisiolal MINISTRY OF RAILWAYS
(2a BS RAILWAY BOARD )
No. 2010/CEDO/ SR/04 New Delhi, dt 03.08.2010
The General Manager/Engg.,
South Central Railway,
Secunderabad.
' Sub: Running of “WDM-3D” (Single/ Multiple) class of
locomotives (without equalizer) with HAHS bogie
on track maintained to other than C&M-1 Voi.I
standard with a maximum speed of 105kmph
over South Central Railway.
Ref: Your office Letter No W/469/WDM3D/Vol.I dt.04.06.10
Vide your letter referred above, clarification have been
submitted in response to Board’s letter of even number, dated
26.02.2010 .
However, in para 2 of the letter Railway has mentioned that
“minimum length of train formation proposed with coupled WDM3D locos
+ 59BOXN wagons + 1Brake Van is 683.8m, whereas the minimum CSR
available at all the yard lines is 686m”.
SC.Rly is requested to send the following clarifications for
further processing the case:
(i) How will train stop within short distance of 2.20m
(i.e. 686.0-683.80) and safety ensured?
(ii) Through which authority, Railway proposes to run trains
with such formation.
Ean
{ Ty Bea { iusswy Of Railways
i “sa ahd
af oo. oe -— ~ - - Seems names ce edna Gowen la bo Sob Apet ie apntetnamm tn wheats
a mn
a wtaa, tad ag ole wa S we ' -
a uaq ward aes, Mea aC : ta WaT
ae fersl—114 001 $.8.Khurana CHAIRMAN, RAILWAY BOARD
s ox
> EX-OFFICIO PRINCIPAL SECRETARY,
a GOVERNMENT OF INDIA ( MINISTRY OF RAILWAYS “ . NEW DELHI-110001
“a
im D.O. No. 2001/M(N)/204/7 Dec 7, 2009
~ My dear
ns Sub: Sanction for running of wagons
o A list of first time sanctions issued by Railway Board during 2009 for running of
~ wagons on Indian Railways is attached. Based on the Railway Board sanction,
~ Railways may obtain CRS sanction immediately for running the wagons on their system,
° so that advantage of higher speed with CC+8/6 t load may be taken.
~ With best wishes, a Yours sincerely,
~ . : a | - de (S.S.Khurana) | WL - General Managers ~ Zonal Railways
—— > :
a RR
< rocece BE eo . |
(Ca. . ~
a |
‘)
a
\S
Running of Wagons —Sanctioned by Railway Board during 2009
File No. Date Subject
No.2009/CEDO/SR/25 21.8.09 Running of BG Bogie open rapid discharge coal hopper
wagon type BOBRNHSM-I wagons having maximum
Axle load of 22.32t (CC+6+2t) loading on nominated
routes of Northern Railway at max. speed 60L/65E
kmph.
No.2009/CEDO/SR/26 21.8.09 Running of BG Bogie covered auto car modified wagon
type BCACM wagons having maximum Axle load of
8.28t loading on nominated routes of N. Rly at max. speed 65L/65E kmph. ,
No.2009/CEDO/SR/21 25.8.09 Running of 22.82t (CC+8+2t) axle load BG Bogie
covered Wagons type BCNM! over Northern Railway
at max. speed 60L/80E kmph.
No.2009/CEDO/SR/22 25.8.09 Running of BG bogie wagon type BCN & BCNA
having axle load of 22.82t (CC+8+2t) loading over N.
Railway at max. speed 60L/80E kmph.
No.2009/CEDO/SR/16 25.8.09 Running of BG bogie open military wagon type
“BCNAHSMI” with axle load of 21.82t on proposed
section of EC Railway at max. speed 60L/60E kmph.
No.2009/CEDO/SR/15 25.8.09 Running of BG bogie open military wagon type
“BOMN” with axle load of 16.40t on proposed section
of EC Railway at max. speed 65L/65E kmph.
No.2009/CEDO/SR/23 26.8.09 Running of BOXNLWMI1 wagon with 22.32t
(CC+8+2t) axle load over entire BG routes upto a
maximum speed 60 Kmph on all BG section of C. Rly .
No.2009/CEDO/SR/19 26.8.09 Running of BOXNHA wagon with 22.82t (CC+8+20)
axle load over specified routes of WC Rly at max. speed
60L/85E kmph
No.2009/CEDO/SR/28 24.9.09 Running of 22.32t (CC+6+2t) axle load Broad Gauge
Bogie Wagon Type BOSTHSM2 over Northern Railway
at max. speed 60L/85E kmph
No.2009/CEDO/SR/45 23.10.09 Running of BG Bogie Covered Wagon type ‘BOSTHSM1’
having maximum axle Toad of 22.32t (CC+6+2t) on all BG
section of South Eastern Railway at max. speed 60L/80E
kmph
No.2009/CE DO/SR/44 23.10.09 Running of BG Bogie Covered Wagon type “BCNAMI
having maximum axle load of 22.32t (CC+6+21) on all BC |
section of SE Rly at max. speed 75L/80E kmph. |
No. 2000/CEDO/SR/43 23.10.09 Running of BG Bogie Covered Wagon type ‘BCNMI
having maximum axle load of 22.32t(CC+6+21) on all BG
section of SEC Rly at max. speed 75L/30E kmph.
No.2009/CEDO/SR/4 | 23.10.09 Running of BG Bogie open rapid bottom discharge coal
hopper Wagon type ‘BOBRNM! having maximum axte
load of 22.32t (CC-+6+2t) on all BG section of East Coast
Rly (except K-K line and Khurda Road-Puri section) at
max. speed 60L/75E kmph.
No.2009/CEDO/SR/27 04.11.09 Running of BOBYN wagon with 22.321 (CC +6+2)) axle |
load over entire BG routes of WC Rly (except Guna-
Gwalior section) at max. speed 60L/75E kmph.
No.2009/C EDO/SR/50 12.11.09 Running of Broad Gauge Bogie open wagon type “BOST”
(CC+6+21) having maximum load of 22.321 over N. Rly at
172
File No. | Date . Subject | max. speed 50L/80E kmph.
No.2009/CEDO/SR/49 | 13.11.09 | Running of Broad Gauge Bogie open wagon type “BOXNM]” (CC+8+2t) having maximum axle load of 22.821 on MGS-GZB, PWL-BINA, MKP-NYN, CNB- BZM-KID-MKP section of NC Rly and over identified routes of WC Rly at max. speed 60L/80E kmph.,
~l
j No.2009/CEDO/SR/52_ | 13.11.09 Running of Broad Gauge Bogie open wagon type
Mp
" “BOXNHSM I” (CC+6+2t) having maximum axle load _ of 22.32t over entire BG routes of WC Rly (except ep Guna-Gwalior section) at max. Speed 75L/90E kmph. ~~18 No.2009/CEDO/SR/40 | 17.11.09 | Running of BG Bogie covered wagon type ~ ‘BCNAHSMI” having maximum axle load of 22.32t (CC+6+2t) on all BG section of NW Rly at max, speed | 75L/100E kmph..
. 19 No.2009/CEDO/SR/51 | 27.11.09 | Running of Broad Gauge ‘BCNHL’ wagon (CC+8+2t) A having maximum axle load of 22.82t aver identified L routes of WC Rly at max. speed 65L/65E kmph.
“~20 No.2009/CEDO/SR/48 | 02.12.09 | Running of Broad Gauge Bogie open wagon type mye “BOXNHL” having maximum axle load of 22.9t on q MGS-GZB, PWL-BINA, MKP-NYN, CNB-BZM-KID- I MKP (CC+8+2t) section of NC Rly at max. speed . SOL/9OE kph.
B I No.2009/CEDO/SR/46_ | 02.12.09 | Running of BG Bogie covered Wagon type ‘BOBRMI “he having maximum axle load of 22.32t (CC+6+2) on all L BG section of East Coast Railway (except K-K line and eo Khurda Road-Puri section) at max. speed 60L/75£ I kmph
on™
“~
~ -
ms
os
rs
i
of
. wn
Vo
Yodo)
cd 5)
40
49
] iD
G/F S|
MAA Bache GOVERNMENT OF INDIA Qa didietal MINISTRY OF RAILWAYS
(ae BS RAILWAY BOARD)
No. 2010/CEDO/SR/16 New Delhi, Dated 26.07.2010
The General Manager(Engg), North Eastern Railway, Gorakhpur.
Sub: Running of “WDP-4D" class of locomotive with a maximum speed of 80 kmph over North Eastern Railway. Ref : Your office letter no. W/340/BG/WDP4D/4A, dated 03.03.2010
In reference to above letter, sanction of Ministry of Railways, Railway Board is hereby communicated for Running of “WDP-4D”" class of locomotive with a maximum speed of 80 kmph over North Eastern Railway, subject to terms and conditions as given in RDSO's Provisional Speed Certificate and Northern Railway’s Joint Safety Certificate, Track Certificate and other Certificates accompanying above referred letter.
CO 2ag ( , mARy 2
eran) freee / Rafter sotPraker (ar) Ar xa aid No. 2010/CEDO/SR/16 New Dethi, Dated 26.07.2010 Copy forwarded for information to: 1. CCRS, Compound of DRM/NER, Ashok Marg, Lucknow-226001 w.r.t. his endorsement no. ®% 13011/05/2010-af8., dated 06.04.2010. 2. The Commissioner of Railway Safety, N.E. Circle, Hazratganj, Lucknow- 226001 w.rt. his letter No.3499/WDP4D/NE/SANC-05 dated 18.03.2010 3. The Executive Director Standards (Motive Power), RDSO, Lucknow, w.r.t. his letter no. DS.WDP4D.11, dated 31.08.2009. Also, please take action for achieving > 100 Kmph speed certificate.
Da Grete qa) >
ote. ad afaa, tad ars Copy to:
(i) General Manager ang (ii) Com issioner of RailWa / safety, ian Railways (except North Eastern Railway)
ii circles (except N.E. Circle) AAT Sats iat. Vo
aS z _ AG LA A wit QAAMYRAS
ri)
. op
e}
3
Payers,
Bry
ce
Se HIT Baca GOVERNMENT OF INDIA yor aargyay MINISTRY OF RAILWAYS
(Jaa Bs RAILWAY BOARD)
No. 2010/CEDO/SR/21 New Delhi, Dated 26.07.2010 The General Manager (Engg.), Northern Railway, Baroda House, New Delhi.
Sub: Running of HHP DMU fitted with High Capacity (180 KN) pneumatic suspension at secondary stage having maximum axle load of 20.32t over various section of Northern Railway at a maxi. Speed of 105Kmph. Ref: Your office letter no. 519-W/895 Pt.I, dated 18.02.2009.
In reference to above letter, sanction of Ministry of Railways, Railway Board is hereby communicated for Running of HHP DMuU fitted with High Capacity (180 KN) pneumatic Suspension at secondary Stage having maximum axle load of 20.32t over various section of Northern Railway at a maxi. Speed of 105Kmph, subject to terms and conditions as given in RDSO’s Final Speed Certificate and Northern Railway’s Joint Safety Certificate, Track Certificate and other Certificates accompanying above referred letter,
a Ou foley Grate aan
Ole Pret Freee / Rife gohPrarer (er) Yad ars
No. 2010/CEDO/SR/21 New Delhi, Dated 26.07.2010 Copy forwarded for information to: 1. CCRS, Compound of DRM/NER, Ashok Marg, Lucknow-226001 w.r.t. his
endorsement no. { 13011/05/2010-afe,, dated 01.07.2010, 2. The CRS/Northern Circte, CRIS complex, Chanakyapuri, N.Delhi-21 w.r.t. his letter No. Q-12(13)HPDMU/05-06/NC/257-59, dated 11.06.2010. 3. The Executive Director Standards (Mative Power), RDSO, Lucknow, w.r.t. his
letter no. SV.AS.HC, dated 14.11.2007 .
Copy to: ; (i) General Manager (Engg.), All Indian Railways (except Norther Raitway)-
(ii) Commisstoner-of Railwayafetpral circles (except Northern Circle) : By. ape
Za > : :
era FU A LO ana NE Wo | ae “Y j ag > 7 Lal?
“>
) 7)
ay
‘J
i>
i 4
HIVA Wawa Sa ARIA @aa aré)
No.2010/CEDO/ORTI/11 New Delhi, dated 24.07.2010
The Chief Administrative Officer (Const.), Southern Railway, Chennai.
faorer: Opening of new Electrified third BG Line between Tiruvallur and Arakkonam stations (26.03 Kms) from Km. 41.750 to Km. 67.780 in Chennai Division of Southern Railway for public carriage of passenger traffic.
aS: CRS/Southern Circle/Bangalore’s letter No. R, 1204/4/2009/SR/Vol.I/91 0-924 dated 29.06.2010.
kk
The above section was inspected by CRS/Southern Circle/Bangalore on 07.03.2010 and opening of the section was authorized by him vide his letter No. R. 12047/4/2009-SR/VolI dated 10.03.2010 with certain observations, The inspection report has been sent to this of fice with a copy to you.
You are requested take necessary action to comply with the various observations made in his above letter for opening the section,
The action taken on different items recorded in the juxta position to the above document may be furnished to CRS/Southern Circle/ Bangalore, endorsing a copy to this office for communicating the approval of the opening of the section by the Board,
No.2010/CEDO/ORI/11 , New Delhi, dated,2@ .07.2010
Copy forwarded for information toute Chief Commissioner of Railway Safety, Ashok Marg, Lucknow-@2600l araTe® { bas Railways
2a, (STATA ORATR) Ua
per wiar, @ax ars)
a)
yD
PPE
Vey
yy
7)
PAY TY
PF PAV.)
mye
yy
PradodD D723
HITA AXBTy ea AAAs
(ora ars)
No. 99/CEDO/ORI/10. New Delhi, dated j« .07.2010 The Chief Commissioner of Railway Safety, DRM NER Compound, Ashok Marg, Lucknow-226001.
farorer :Opening of new BG double line between Kasargod and Kumbala stations of Palghat division of Southern Railway for public carriage of passengers,
ME :(I)CCRS's Letter No. R. 12027/2/99-RS dated 04.05.99 (i)CRS's (Southern Circle) letter No. R. 12027/3/99-SR dated 08.04.99
With reference to your endorsement No. R. 12027/2/99-RS dated 04.05.99, the approval of Ministry of Railways is hereby communicated to the recommendation of Commissioner of Railway Safety, Southern Circle, Bangalore for opening of the above section for public carriage of passengers as per his letter No. R. 12027/3/99-SR dated 08.04.99,
(Hrotren aRarT=) Se apicionrat farBeras ait S yctt.
Grover ars)
No. 99/CEDO/ORI/10, New Delhi, dated \y .07.2010
Copy forwarded for information to:
(i) The Commissioner of Railway Safety, Southern Circle, 7, Seshadri Road, Gandhinagar, Bangalore-560009, w.r.t. his letter No. R. 12027/3/99-SR dated 08.04.99, (ii) The Chief Administrative Officer (Const.), Southern Railway, Egmore, Chennai-600008. (iii) The General Manager (Engg), Southern Railway, Chennai,
} Se, ey HTT
' cs
athustry © Uae (37 7
= " 7 er
oper . sine
ca aT 72
AN ch arr
:
mah XN =| ™
ep eel? 7h .
-,
a
ae ae
2 ny
vy
a
ae
) yad
‘J <>
ae)
No, 92/CEDO/SR/4/0/Pt.z
OTR ARETE Government Of India TA Aare Ministry Of Railway @at ats) (Railway Board)
New Delhi, dated Fa 2010 . a The General Managers,
All Indian Railways.
The General Manager, Metro Railway, Kolkata,
The Director General, RDSO, Lucknow.
The Managing Director, Konkan Railway Corporation Limited, Navi Mumbai.
Sub: Correction Slip to Para 6.1(a} of Revised Policy Circular No. 6 on the Subject of ‘sanction of speed of nominated trains on specific routes’, Ref : Railway Board's letter no, 92/CEDO/SR/4/O/P+.I, dated 23.11.06,
(i)
(ii)
For permitting speeds above 105 kmph, the track on the route should be maintained to standards specified in RDSO Report no.
Zonal Railways may increase the length of trains upto 24 coaches plus one Inspection Carriage, without CRS Sanction, provided various departments of the Zonal Railway certify (as required to be done for obtaining cRS sanction) to PCE/CE(Co-ord) that the necessary conditions for running such trains have been fulfilled and that the Stopping stations have been provided wit; essary facilities like the required length and widt. val of: infringements,
vac TOR! ny Bae tT am
‘Fall : lighting and watering arran mentssete7 Snthe, platform.
srts ATES Red sat ore
(iii) The sanction to the proposals for increasing the sectional speed to 110 kmph & increasing the length of trains upto 24 coaches plus one Inspection Carriage, as detailed in (i) & (ii) above shall be granted by PCE/CE (Co-ord).”
This is for your information & necessary action.
Ne a Cnet o4/s7 “
@ilctes aa)
wrest feces eft.s. sof.
Jara aE
Copy to :
Sr.PPS to CRB, ME, MT, ML, MM, FC and Secretary for kind information of CRB, ME, MT, ML, MM, FC, MS & Secretary.
CCRS/Lucknow for kind information.
Director/IRICEN/Pune for kind information.
ale
a,
& % Mhuiatry . y
tag t “eadbway eu.
. Rd. .e
“A Rneleswse
a eecooenmarses 2)
Baro Woo ae “ii eemeerems, 228
Page 2
ei
> on y “ay gia atachra GOVERNMENT OF INDIA a Rat dsletal MINISTRY OF RAILWAYS
A (aoa Ws RAILWAY BOARD )
~ . g ~ No. 2010/CEDO/SD/07 New Delhi, Dated 2507-2010
” The General Manager(Engg), _ South Central Railway, - Secunderabad-50600 071. A
~ Sub: Condonation for lesser track spacing in connection with . new BG line between Obulavaripalli and Krishnapatnam,
Oo proposed connection of Venkatachalam Road Junction on ~ Obulavaripalli- Krishnapatnam section to New ‘B’ class ~ station on Gudur - Vijayawada section of Vajaywada
a division of South central Railway.
_ Ref : Your office ietter No. W.573/Infringements/OBVP-KP o, dt.06.04.2010
A With reference to your letter referred above, sent through the Chief
Commissioner of Railway Safety, Lucknow, the sanction of Ministry of Railways,
2 Railway Board is here by communicated for Condonation for lesser track
‘ Spacing in connection with new BG line between QObulavaripalli and
~ Krishnapatnam, proposed connection of Venkatachalam Road Junction
és on Obulavaripalli- Krishnapatnam section to New ‘B’ class station on
Gudur - Vijayawada section of Vajaywada division of South central
o Railway as shown in Form-XVII and drawings enclosed with above referred
no application .
~ a
a (aneite aa)?" x. arent Frese /Rifter gotta ar) os Fat dts
7 No. 2010/CEDO/SD/07 New Delhi, Dated 05.07.2010
~ Copy forwarded for information to:
~ (i) The CCRS, Compound of DRM/NER, Ashok Marg, Lucknow -226001 w.r.t.
. his endorsement no. 44, 11018/02/2010-c.fa/272dated 26.05.2010
S (ii) The CRS/South Central Circle, Sarojini Devi Road, Secunderabad-500 071
~ w.r.t. his letter no. Q.11018 {Ki6, dt.04.05.2010
" Ta sreoy®
o { worst a
7
1)
au qurgyt! ne
STV MIAN?
Waa atzaHre GOVERNMENT OF INDIA
Ya dala MINISTRY OF RAILWAYS
(ear @S RAILWAY BOARD )
No. 2010/CEDO/SD/06 New Delhi, Dated 22.06.2010
The General Manager(Engg), Northern Railway, HQ.Office,
Baroda House, N.Delhi
Sub: Condonation for infringement of track centre distance of
existing track and.newly laid track under existing ROB
No. 116 at Chainage 46/384.145 situated in between
Chhan Arorian - Hira nagar stations on Pathankot -
Jammu Tawi section of Firozpur division of Northern
Railway. z i
Ref : Your office letter No. 519-w/905/Pt.-I, dt. 12.01.2010
With reference to your Jetter referred above, sent through the
Chief Commissioner of Railway Safety, Lucknow, the sanction of Ministry
of Railways, Railway Board is here by communicated for Condonation
for infringement of track centre distance of existing track and newly
laid track under existing ROB No. 116 at Chainage 46/384.145
situated in between Chhan Arorian - Hira nagar stations on
Pathankot -— Jammu Tawi section of Firozpur division of Northern
Railway as shown in Form-XVII and drawings enclosed with above
referred application .
co laa 223. GypP>
(Gee BAR) 7 ariert Pesan /fafaa gotta (a)
\ Read BS
No. 2010/CEDO/SD/06
Copy forwarded for information to:
.- (i) The CCRS, Compound of DRM/NER, Ashok Marg, Lucknow -
226001 w.t.t. his endorsement no. ®&] 11014/02/2010-7 fa,
dated 21.04.2010.
(ii) The CRS/Northern Circle, CRIS Complex,Chanakyapuri, N.Delhi-21
w.r.t. his letter no. 3 }inf/N.C/1299-1301, dt.31.03.10
New Dethi, Dated 22.06.2010
Q ore
aa afte, tn a
ao _4:99/0
(anreire amr) **"
\ 25 ‘
panna of aa ,
PL > GF
aad aiaecnry GOVERNMENT OF INDIA et dialeta MINISTRY OF RAILWAYS
(Jaw Bs RAILWAY BOARD )
No. 2010/CEDO/SR/20 New Dethi, Dated 21.06.2010
The Director General/Track,
RDSO, Manak Nagar,
Lucknow-226011.
Sub: Condonation of infringement to IRSOD by Rail Grinding Machine Model RGI 72, supplied by M/s Loram, USA.
Ref : Your office letter No. CT/MT/SOD, dated 28.04.2010
With reference to your application referred above, sent through the CCRS, Lucknow, the sanction: of— Ministry of Railways, Railway Board is
hereby communicated for Condonation of infringement to IRSOD by Rail Grinding Machine Model RGI 72, supplied by M/s Loram,USA.
The design of this Rail Grinding Machine Model RGI 72, infringes clause No. 9 of Chapter-IV(A) of IR B.G. Schedule of Dimensions, Revised, 2004 as per Annexure-I , drawings & other details accompanying with your above referred letter .
“ CO Any (rete qar)?"e"
orton Frese / fate soirafer car) ort ae
No. 2010/CEDO/SR/20 New Delhi, Dated 21.06.2010
Copy Ferwarded for information to the Chief Commissioner of Railway | Safety, Compound of DRM/NER, Ashok Marg, Lucknow -226001 w.r.t. his endorsement no. 4 17012/06/2010-a%, dated 26.05.2010.
it
ae
(areitas agar) *"S 7" wed ead, Yad ats :
Copy to: (i) General Manager (Engg.), All ree (ii) Commissioner of Railway care
7
Troe! Vie or ann Ae a
: gc eet Ce
MAT BAH GOVERNMENT OF INDIA Yea sisrera MINISTRY OF RAILWAYS
(2omr wrs RAILWAY BOARD) -
No.2008/CEDO/SD/09. New Delhi, dated 16.06.2010
The Executive Director (Track) Manak Nagar ,RDSO, Lucknow-226 011
Sub: Running of CC+8+2 trains with 58 BOXNs- Length of Loop Lines- Review of Provision in IR SOD B.G Revised, 2004
Ref: Board’s letters (i) No. 97/CEDO/SR/14 dt. 29.05.06 (ii) No. 2008/CEDO/SD/09 dt. 08.08.2008
Vide Board's letters referred above, RDSO was requested to submit their recommendations for Running of CC+8+2 trains with 58 BOXNs- Length of Loop Lines- Review of Provision regarding adequacy of loop lengths, referring to Section 23 of Chapter II of Schedule I in TR SOD 8.G.Revised, 2004. The recommendation are still awaited.
However above item was also raised in meeting held in Board with RDSO on 08.03.2010.
You are requested to kindly submit the recommendations at the earliest so that necessary correction/amendments in IR SOD B.G. Revised, 2004 if any, can be considered by Board and pending references of Zonal Rlys may be disposal of.
_ Peter a a ; be Qa
(areas apa) ! 66+ ~ Heer) esr / ee FAP (ar) oy AG , yaa ad
aks e ey aa of ber oe - . oe Ee ome
Al
age 77 f . Xa
Veet \ ~ Ae Aad atactey GOVERNMENT OF INDIA of S : yg abe a AMAT MINISTRY OF RAILWAYS “ (Fae Bs RAILWAY BOARD )
om .
a,
~ No. 2008/CEDO/sD/09. mo New Delhi, dated 08.08.2008 p
. The Executive Director (Track) _ Manak Nagar ,RDSO,
a“ Lucknow-226 O11
~
~ Sub: Running of CCt8+2 trains with 58 BOXNs- Length of o~ Loop Lines- Review of Provision in IR SOD B.G ~ Revised,2004
m Ref: (i) Board’s letter No. 97/CEDO/SR/14 dt. 29.05.06 ~ (14) CTE/SECR letter no. Engg/TC-2/CRS-Rolling
ms stock/2124 dt. 23.07.08 (copy enclosed)
ce Vide Board’s letter referred at (i) above, RDSO was requested to submit their recommendations for Running of CC+8+2 ny trains with 58 BOXNs- Length of Loop Lines- Review of Provision ~ in IR SOD B.G.Revised, 2004. The recommendation are still & awaited. ~ Now CTE/SECR vide letter referred at (ii) above has . sought condonation of infringements of same item of IR sop _ B.G.Revised, 2004 for running of freight trains with “59 BOXN “ wagons, “ You are requested to kindly submit the recommendations at ~ the earliest so that necessary correction/amendments in IR SOD ° B.G.Revised, 2004 if any, can be considered by Board. ~ wore oa ~ .
~ Encl: As above. “| 2—__- ( T.Gupta )
a Ae Executive Director Civil Engg. (G) Rallway Board.
~ Copy to :- ~ 1) GM(Engg)/SC Railway, Rail Nilayam, Secunderabad-500 07] ms w.r.t.-letter No. W.438/BOxXN/2005 dated 26.05.06 & 30.7.08 “ 2) CTE/SEC Railway, Bilas ur~495004, w.r.t. his letter no. ~ Engg/TC-2/CRS-Rolld stock/2124 dt. 23.07.08
fh i. oP
~ “art
. ws? ~ A a la Ady er
as gia ‘aTstere GOVERNMENT OF INDIA 44 der darera MINISTRY OF RAILWAYS
(Ferd wits RAILWAY BOARD ) |
No. 97/CEDO/SR/14. New Delhi, dated 09 .05.2006
The Executive Director (Track)
Manak Nagar ,RDSO,
Lucknow-226 O11
Sub: Running of CC+8+2 trains with 58 BOXNs- Length of
Loop Lines- Review of Provision in B.G SoOD-
Revised ,2004
Ref: PCE/SCR D.O. letter No .W,438/BOXN/2005 dt.26.05,2006
to ME.( copy enclosed) :
_ For running of CC+04+2 trains on the nominatcd routes,
JSC was processed by the SC Railway and application submitted
to CRS/SC.CRS has raised a query regarding adeguacy of loop
lengths, referring to section 23 of Chapter II of Schedule I
( page 16 of B.G.SOD, 2004.)
In consequence to above PCE/SCR vide his DO letter to ME
under reference is enclosed ( with all enclosures) herewith
for your examination
Kindly submit your recommendations at the earliest for
perusal Of Board, so that necessary correction/amendments in
B.G.S0D,2004 can be finalised expeditiously. AAA BAA
— or” on
( N.K.Sinha’) D¢.. inane
Executive Director Civil Engg. (G)
Railway Board.
é
on A a”
Encl: As above.
~
. Copy to i-
~ 1) PCE/SC Railway, Rail Nilayam, Secunderabad—500 OTL w.xr.k.
: his DO letter No. W.438/BOXN/2005 dated 26.05.2006.
ee
“-~ —
anacpiat Batter ey” : , \ * a | ~ ear bP aN) \S< uA
TRE eas
7S GIF
COVERNMENT OFF INDIA
MINISTRY OF RAL WAYS
“(RALLAYAY BOARD)
No IV/CEDOUSR/14 New Delhi, dated 69.6.2006.
OG
The PCE
South Central Railway
Secunderabad
Subject:- Running of CC+ 8 +2 tras with 58 BOXNs — Length of Loop
lines — Review of Provision in SOD — 2004
Reference:- Your Railway's ictler No. W.438/BOXN/2005 dated *
26.5,2006,
done the provisions contained in Scelion Board (MIE) has decided lo con
004 provisionally for running of CC+84+2 23, Chapter H of Schedule —I of Revised SOD-2
traing with $8 BOXNa, Section 23, Choptor Hoof Schedule | af S$ON-2004 is under
review with RDSO and is likely to lake some more time before RDSO’s recommendation
is available. Since running of CC+8+2 trains with 58 BOXNs is a priorily tem,
provisional condonation is accorded till the necessary modification in Section 23 of SOD-
2004 is obtained from RDSO.
. cotbkefnuy EDCE (B&S)_
G/E
fava :-Opening of newly laid track with newly constructed
important bridge No. 393 (Cheyyeru} on permanent diversion from the existing track from ch. 216993.70
M te ch. 219550.00 M (Km 216/14-15 to 219/8-9) between Hastavaramu and Nandalur stations including energisation and introduction of 25 KV _ electric traction between Loc. No. 217/3A(KM 217/169.50 M) and 219/17 (KM 219/490.90 M) of BG Single/Double line of Renigunta-Guntakal section, Guntakal Division, South Central Railway for public carriage of passengers.
Wat : Your letter No. W. Con. 347/G/157 dated 05.05.2010. RRR
With reference to your letter referred above, it is mentioned that CRS Inspection Report dated 04.09.07 and authorization letter have not been received in Board office.
You are requested to send topies of CRS Inspection Report dated
04.09.07 alongwith authorization letter,to this office for communicating the approval of the opening of the section by the Board.
i :
(aretta gan)! orden Pree / ag. om
Copy to: (i) The Commissioner of Railway Safety/South Central Circle,
Secunderabad w.r.t. his letter No. 12058/02/07-SCC/755 dated 04.09.07.
(ii) The Chief Commissioner of RaiwaySafety, DRM, NER Compound, Ashok
—a ~ 7Y
AINA ANHIY
ta Walaa (Rad ate)
No.2010/CEDO/ORI/3 New Delhi, dated oF 06.2010
The Chief Administrative Officer (Const.), South Central Railway, Secunderabad.
ahs
Ge ad
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS
(RAILWAY BOARD)
New Deilhi-110001, No.2010/CEDO/SR/06 Dated: 26/05/10
General Manager, South Eastern Railway,
Kolkata.
Sub: Replacement of BOBRN wagons with other for transportation of iron Ore.
Board (ME & MT) has agreed for replacement of BOBRN wagons with
BOXNEL wagons for which instructions have already been issued authorizing
South Eastern Railway to convert 10 to 12 BOXN rakes to BOXNEL rakes.
Further, it is decided that BOBRN wagons should be replaced with
BOBSNM1/BOXNEL wagons. The necessary arrangements for the replacement
of BOBRN wagons should be expedited. To start with, loading of iron ore fines
should be shifted to BOBS/BOXNEL.
The rehabilitation of the track affected by dropping of iron ore should also
7 be taken in expeditious manner. {
: fe
Action taken and progress made in this regard may please be advised to
Board from time to time.
, Xe : Been (B.D. Galgy |S! 0
: y Exec. Director Civil Engg. (Plg.), fa Save -_ Railway Board.
OC ZADCEPKS10-1 I\nk\May-10.doc ; Page 37 of 40
Syd:
i)
Gir fp 7
Sad ateenly GOVERNMENT OF INDIA at dialer MINISTRY OF RAILWAYS
(Aaa BS RAILWAY BOARD )
No. 2010/CEDO/SD/04 New Delhi, Dated 25 .05.2010
fhe General Manager(Engg), Central Railway, HQ.Office,
CST, Mumbai.
Sub: Badnera: Condonation of infringing gradients of 1i1n150
(02 nos), 1 in 176,1 in 191.25 , 1 in 209.424 (02 nos) in connection with proposed chord line connecting Mumbai-Nagpur main line to Badnera -Amravati branch line between Bhusawal-Badnera section of Bhusawal Division of Central Raiiway.
Ref: Your office Letter No EW.221.W.17, dt.10.02.2010.
With reference to your letter referred above, sent through the Chief
Commissioner of Railway Safety, Lucknow, the sanction of Ministry of Railways, Railway Board is here by communicated for Condonation of
infringing gradients of 1in150 (02 nos), 1 in 176,1 in 191.25 , 1 in 209.424 (02 nos) in connection with proposed chord line connecting
Mumbai-Nagpur main line to Badnera -Amravati branch line between Bhusawal-Badnera section of Bhusawal Division of Central Railway as shown in Form-XVII and drawings enclosed with above referred fetter. —
Hy (rete GAR)
amen Presa /Rifaa sohPraker Car.) ard arg
No. 2010/CEDO/SD/04 New Delhi, Dated 25 .05.2010
Copy forwarded for information to:
(i) The Chief Commissioner of Railway Safety, Compound of DRM/NER, Ashok Marg, Lucknow -226001 w.r.t. his endorsement no. ¥,
17012/01/2010-cfa., dated 15.03.2010.
(ii) The Commissioner of Railway Safety, Central Circle, 2. Floor, Churchgate Stn. Bldg. Annexe, M.K. Road, Mumbai =.400 020 w.r.t.
letter no. C-13(195)/2008-f8/556,-<dated 02/11.03.2010 items Totes : Ty
en ee TO ant vn A <3 c apie
a AO cot ° (irate aq) Ee
OIF ut
nn wr! hp UT AHS
& Sis ee Ye Hartera (Rea BIS) op
_ &. 201L0AiReI/crat/11 ae fave, feaie:2 } 05.2010
Felreeren/ Tra, BFALS., AAG TR,
mMe7sH-226 011.
faga: ta ata teed, aren are Pifse gate arqeet sact SaT Want fecal & fore areetta tor (St orga) Aonfera GR arpa, 2004 & sectert at ATH BAT |
aed: ara rater et feat «= 12.06.2009 = owt iw. Meat aisiteactane/ stat gast |
Waa, Tats H ana S sh We seh Sea atadas H Geet 4, tor alg teed, eae ant fifa gate aarp sae Sat Want fecal a few ance ter denied wks seh, 2004 & seciar Ht arp aed ch few ter Aarers, tere ate ant calepier Sater Ht Set SI
HF Raitt Tarp Sac Sat Want fest dh Teoreq F arqae-I bh ara OR tet set TSA Genre aars atqyst 2004 & avara Iv (#) Has F. 29, 9, 19(8), 20(a), 30 aen sma ©. | a an aecias @, ah Seefat oa are Zt
Te GST eM ata AR aS cht fecafirat & are FPA é:
1. a.aane. ant fnifte feu qe see areafes vot cer Pratfte ea & aha setae tors ant staee St Bla st ST |
2. atta tad aha amt (sai wae-easr cea Aas-aeneTae) We SALA. & Garet & arqan gash garg sae Sax Want fesat & aw PSone & SUT AT Social Se Haas Oat He |
3. dant feed emnt cnet ox 75 fect. ofa der cen see sitive afer we ae We Ae Sa GAA TT F aes wT S fe ea OM, Heal aca KI arent & Hal ante A wafer Fear ae | _
eT reemaasasc
Ce Byay Ministry Of Raihvaya
te at ates
cams ° “_
order ge at ornifeat aed wea, até 3 freer onaave. & far Pratead fecaftrat are at &:-
"FALE. HHH cet Ww a feet got nf oe went & fae dah acta A aeiter swear te deitfir aat a chad a oftads @ dale eet a Tet ere |"
SAALE. 8 ante ¢ ae Fe a sie Ht cen art antral st aie ats (aaer Scie) al ATPIN HAT SATA ST A |
| dae (ate Bar)
ardent Frese, Rafat galttrat (ara) rea aS
a. 201 0/Ad Stat easTe/ 11 ae facet, Ferien: | .05.2010
wicca: Tet ter Wen AER, ShaRTA/qah tea & dorss, aes ant, waa 226 001 at Se fetes 12.03.2010 & ysis W. ay 17011/01/2010-4.. & et F Gere aia
<— ay Q
(ate BAR) ae ataa, tera as
Whaat wea:
(1) Fetetern (Sota), att areca tet (ii) tor aeen aga, wet whet |
> p>)
x
~
oN y
2
SK Fol? ony Ie S Maza alacila GOVERNMENT OF INDIA
2a dalara MINISTRY OF RAILWAYS
(eat BS RAILWAY BOARD ) t
No. 2010/CEDO/SR/19 New Delhi, Dated 20.05.2010
The Director General/Track, “
RDSO, Manak Nagar, 4
Lucknow-226011.
Sub : Condonation of infringements to Indian Railway (BG)
Schedule of Dimensions Revised, 2004 for Air
Conditioned Kolkata Metro Motor (MC) & Trailer (TC)
Coaches from ICF,Chennai to Kolkata up to maximum
speed of 55 kmph for movement on Indian Railways.
Ref : Your office letter No. CT/MT/SOD, dated 28.04.2010
With reference to your application referred above, sent through the
CCRS, Lucknow, the sanction of Ministry of Railways, Railway Board is
hereby communicated for Condonation of infringements to Indian
Railway (BG) Schedule of Dimensions Revised, 2004 for Air
Conditioned Kolkata Metro Motor (MC) & Trailer (TC) Coaches
from ICF,Chennai to Kolkata up to maximum speed of 55 kmph
for movement on Indian Railways.
The design of these Air Conditioned Kolkata Metro Motor (MC)
& Trailer (TC) Coaches infringes clause No. 2(ii),10,14 of Chapter-IV(A)
of IR B.G. Schedule of Dimensions, Revised, 2004 as per Annexure-I ,
drawings & other details accompanying with your above referred letter .
a A Sh, 14-278
* @ilcit GAR) orient Fewe/fafta goa (a)
aa ars
No, 2010/CEDO/SR/19 New Delhi, Dated 20.05.2010
Copy forwarded for information to the Chief Commissioner of Railway
Safety, Compound of DRM/NER, Ashok Marg, Lucknow -226001 w.r.t.
his endorsement no. #, 17012/04/2010-afa,, dated 30.04.2010.
Ch . (ice wR) '3°""
a
Copy to: \, 7
(i) General Manager (Engg.), All Inpian Railways... +
(ii) Commissioner of Railway Safety, Ali cirelgs. cac.so.ro
Gf F om .
; Oo
UT WHIT: oe Ya Waa (tod ate)
No. 2000/CEDO/ORI/13. New Delhi, dated //.05.2010
The Chief Commissioner of Railway Safety, DRM NER Compound, Ashok Marg, Lucknow-226001.
frra:- Opening of new B.G. electrified Dn line from Akra (Km 19.42) to Nangi (Km 22.39) stations on Sealdah- Budge Budge section of Sealdah division of Eastern Railway for Public Carriage of Passengers.
viaat-(iJCCRS’s Letter No. R. 12022/02/2000-RS dated 10.05.2000 {ii)CRS’s (Eastern Circle) letter No. 608 /1/2000/885/H dated 31.03.2000
cones
With reference to your endorsement No. R. 12022/02/2000-RS dated 10.05.2000, the approval of Ministry of Railways is hereby communicated to the recommendation of Commissioner of Railway Safety, Eastern Circle, Kolkata for opening of the above section for public carriage o { passengers as per his letter No. 608/1/2000/885/H dated 31.03.2000.
CO LAL ( 5 yee
C- went Pree / ah. / ah,
No. 2000/CEDO/ORI/13. New Delhi, dated ;7.05.2010.
Copy forwarded for information to:
(i) The Commissioner of Railway Safety, Eastern Circle, 14, Strand Road, (12% Floor), Kolkata-700001, w.r.t. his letter No. 608/1/2000/885/H dated 31.03.2000. :
(ii) The Chief Administrative Officer (Const.), Eastern Railway, Kolltata. (ii)The General Manager (Engg), Eastern Railway, Kolkata.
Bea Byastucs Pee ee ee cee ae eet eae
r
a
FING FNHIY
Ya Waray Rad ats)
No, 2007/CEDO/ORI/10, New Delhi, dated /§ .05.2010
The Chief Commissioner of Railway Safety, DRM NER Compound, Ashok Marg, Lucknow-226001.
farwer:- Opening of newly constructed BG line with conversion of section into orthodox doubling including introduction of 25 KV AC electric traction between Habra (Km 44,260) - Machlandapur (Km 53.480) stations as UP/Dn line, a part of Habra-Chandpara doubling of Sealdah division, Eastern Railway for public carriage of passengers and goods traffic.
aaa. (i)CCRS’s Letter No. R. 12032/02/2007-TW dated 23.05.07 (ii)CRS’s (South Central Circle) letter No. 606/1/1/06/SCR/T-4. dated 08.03.07
With reference to your endorsement No. R. 12032/02/2007-TW dated 23.05.07, the approval of Ministry of Railways is hereby communicated to the recommendation of Commissioner of Railway Safety, South Central Circle, Secunderabad for opening of the above section for public carriage of passengers as per his letter No. 606/1/1/06/SCR/G-%, dated 08.03.07.
pr Oh, | (stettar aa). 8° I orton! Pree / a / of,
No, 2007/CEDO/ORI/ 10. New Delhi, dated /8 .05.2010
Copy forwarded for information to:
(i) The Commissioner of Railway Safety, South Central Circle, Opp. Railnilayam, 8.D. Road, Secunderabad-5000071 w.r.t. his letter No. 606/1/1/06/SCR/¥. 4. dated 08.03.07.
(u) The Chief Administrative Officer (Const.), Eastern Railway, Kolkata. (iii) The General Manager (Engg), Eastern Railway, Kolkata.
AER EY: Pymnlure ee
mrdy cat Fahy
A G/F N UNG. UHV
Ya Waray
ad ate) . No. 96/CEDO/ORI/35. New Delhi, dated\{ .05.2010
The Chief Commissioner of Railway Safety, DRM NER Compound, Ashok Marg,
Lucknow-226001.
faga:- Opening of newly converted BG line of the single line
section between Parasia and Chhindwara stations on
Nagpur division of Central Railway.
aaat:- (i)CCRS’s Letter No. Q. 12031/1/96-RS dated 05.09.96
(ii)CRS’s (Central Circle) letter No. C-12(112)/96-H/297 dated 23.07.96
With reference to your endorsement Q. 12031/1/96-RS dated 05.09.96, the approval of Ministry of Railways is hereby communicated to the recommendation of Commissioner of Railway Safety, Central Circle, Mumbai for opening of the above section for public carriage of passengers as per his letter No, C-12(112)/96-H/297 dated 23.07.96,
a ae CO ~~
. f2.
Bee AAT) O/e- wider Rese / ag ot.
No. 96/CEDO/ORI/35. "New Delhi, dated |&.05.2010
Copy forwarded for information to: ™ a
(i) “The Commissioner of Railway Safety, Central Circle, 274 Floor, Churchgate Stn. Bldg. Annexe, M.K. Road, Mumbai-400020, w.r.t. his letter No. C- 12(112)/96-H/297 dated 23.07.96,
(ii) The Chief Administrative Officer (Const.), Central Railway, Mumbai. {iii)The General Manager (Engg), Central Railway, Mumbai.
pen Ce
. rece poe sermon aren & (atretlep BAR)
nl & i uasnio | Baer ad ufea, Ror az) Per ae
AOA a : ee wg ¥ ea t Mana
met it tf iit
trate of dee oe serene TO
BSE Coca
A | cr +4
restr a
G. 201 0/eiestat/wawy/1 xi feet feate: I #05. 2010
Tess (Ssithren}) . 1. Teg tera, dad ; 9, sat agar Tord, srearge . 2, Ue tard, etereprar 10. afarot tera, BS | 3. yt req tera, erefiqr 1, afaroy qq tera, Pecharrare 4. dae ted, yaqyar 12, @fater ad tere, terme 5. Sav tera, ae froth . 13, efaror qe neq tera, fara 6. dae req ter, gerrerare 14. efarn uffan tera, gaett 7. qahar tere, wheage 15. affar ter, gad | 8. gata ater tera, parent 16. uffar neq ted, wage
fan: dota tt & fined do st reqa eet was: ga aerators wr fete 11.02.1992 ar oa a. 92/aesiaware/]
aale tet & feeen to ter tat sar atte aS aeeil era Weed ae a dsr adel Fotg ot tq ceast Bee rt ah fee ardfirr necoqut qendet 21 eaten 11.12.1992 & ua danger, 31 art 2010 ae tered & areas ve etfs fen Ay 31, Te 2010 cree aS spree st org ° A
‘ Te: sired arpa & fa; 31°03.2010 er eels 0 args a HPs re a. Tat 25 ulead (orest cree a aitg ane ferry & wa 2), C4 Great a 25 vrata . BOT 201 cee ee ee Sets Hehe eater cee #)
31.07.2010 cep ate aoratera # Paster &
Be ae gas Piven ong Pe Reeen Ay sleaze oa & aiafne ampell &
errr fo <— Dae sierra: SORTA (areite gare °°
ardart Fev, fataet data (st) reard ats
NA YO : ~ Par atl FIN UN DIR
PIKES ta FarTay A ad sty) a °
- No.2010/CEDO/ORI/7 New Delhi, dated \y .05.2010
“\ -The Chief Administrative Officer (Const.}, Southern Railway, Chennai.
A
~ fara :-Opening of the gauge converted BG line between
Villupuram Jn. (Excl.) and Mayiladuthuri Jn. (Incl.) ~ section of Tiruchchirappalli Division of Southern ~ Railway for public carriage of goods and passenger
traffic, ~
A weet : CCRS/Lucknow’s letter No. R, 12037/1/2010--TW
dated 30.04.2010. om
kkk
o The above section was inspected by CCRS/Lucknow on 16 and 17% ~ March 2010 and opening of the section was authorized by him vide his letter
No. R. 12037/2/2010-SR/CCRS dated 18.03.2010 with certain ” observations. The inspection report has been sent to this office with a copy a to you.
~ You are requested take necessary action to comply with the various ~ observations made in his above letter for opening the section.
~ The action taken on different items recorded in the juxta position to “ the above document may be furnished to CCRS/Lucknow, endorsing a copy
“ to this office for communicating the approval of the opening of the section by on the Board.
~ a
4 orale BAR) <— area) rene JAE / TH.
~
_ No.2010/CEDO/ORI/7 New Delhi, dated \y .05.2010
a Copy forwarded for information to the Chief Commissioner of Railway Safety, Ashok Marg, Lucknow-226001 with reference to their letter No. R.
~ 12037/1/2010-TW dated 30.04. 2010). oman, ~ Pern Ee ORTATT . ; ——
| bade ae (Guele a TR)
~ ee uted, Rad ag)
ma mynalurs perme es varity wt fete
_ ant Mee vee cents cmap ant:
ton,
Je.
2.970 DDD
9 )
) )
) >)
)
SIF HIZdA ABHI Ty 2a AWA
(tera ate) No. 2010/CEDO/SM/1 New Delhi, dated\2 -05.2010.
The General Managers (Engg.],
1. Central Railway, Mumbai, 9. North Western Railway, Jaipur 2. Eastern Railway, Kolkata. 10, Southern Railway, Chennai. 3. East Central Railway, Hajipur. 11. South Central Railway, Secunderabad. 4. East Coast Railway, Bhubaneswar. 12. South Eastern Railway, Kolkata. 5. Northern Railway, New Delhi. 13. South East Central Railway, Bilaspur. 6. North Central Railway, Allahabad. 14, South Western Railway, Hubli. 7. North Eastern Railway, Goraphpur. 1S, Western Railway, Mumbai. 8. Northeast Frontier Railway, Guwahati. 16. West Central Railway, Jabalpur.
fava: - Submission of System Maps of the Zonal Railways.
weal: - This office letter No. 92/CEDO/SM/1 dated 11.2.1992.
System Maps of the Zonal Railways are important documents required to be consulted for taking up the investment decisions in Railway Board by MR Cell and Board Members. As per letter dated 11.2.1992, the System Maps updated and corrected as on 31st March 2010 of the Railway should be submitted to Board’s Office by 31st July 2010.
You are, therefore requested to send 25 copies each of the coloured System Maps of Size A-O (duly folded neatly in a cover), 25 copies of Size A-4 and 10 copies of the Time Table Maps(Five Plain and Five Showing the Divisional Jurisdictionjup dated and corrected as on 31.3.2010 to Board’s Office by 31.07.2010.
It may please be ensured that the System Maps have been prepared strictly in accordance with instructions contained in the letter quoted above. '
ATO SHAT TAS Ce Ls
BAN Ip of Raflwn Pad gg
Mowat... ql oo
cunt
al
) x.)
29
)
G Ye Ta
Wad Wary GOVERNMENT OF INDIA Qt Baier] MINISTRY OF RAILWAYS
(Aer Ws RAILWAY BOARD )
No. 2010/CEDO/SR/11 New Delhi, Dated 11.05.2016
The Director General/Track,
RDSO, Manak Nagar,
Lucknow-226011.
Sub: Condonation of infringements to Indian Railway (BG)
Schedule of Dimensions Revised, 2004 for EOG Air
Conditioned Double Decker Coaches manufactured by RCF,
Kapurthala .
Ref: Your office letter No. CT. /CONTR/BG/MG, dt: 12.06.09
With reference to your application referred above, sent through the CCRS, Lucknow, the sanction of Ministry of Railways, Railway Board is hereby communicated for Condonation of infringements to Indian Railway (BG) Schedule of Dimensions Revised, 2004 for EOG Air
Conditioned Doubie Decker Coaches manufactured by RCF, Kapurthala.
The design of these EOG Air Conditioned Double Decker Coaches infringes clause No. 29,9,19(b),20(b),30 of Chapter-IV(A) and Diagram No. 1D of IR B.G. Schedule of Dimensions, Revised, 2004 as per
Annexure-I , drawings & other details accompanying with your above referred letter with Board’s comments as under:
1. The clearance between Kinematic profile and fixed structure as recommended by RDSO MUST be ensured by the Railway.
2. The Zonal Railway MUST ensure the removal of the existing infringements due to the new design of EOG AC Double Decker Coach as per RDSO’s suggestions on the nominated routes {i.e. Dhanbad- Howrah and Mumbai-Ahmedabad }
3. These coaches not to run on the platform lines at speed of 75
kmph and beyond. This should be visibly printed in Time Tables,
displayed in Cabins and SM’s rooms etc.
While approving the above condonation, Board have passed the following remarks for RDSO as:
"RDSO to explore the solutions regarding revision to COP
clearances to run these coaches at full speed through platform lines or to alter the COPs to such revised standards.”
RDSO is requested to examine the issue and send their comments so that Board(ME) could be appraised accordingly.
a AR (aireitas B ) nfspe
of . . a“ / Raters ie (8)
-2-
No. 2010/CEDO/SR/i1 New Deihi, Dated 11.05.2010 Copy forwarded for information to the Chief Commissioner of Railway Safety, Compound of DRM/NER, Ashok Marg, Lucknow -226001 w.r.t. his endorsement no. 1701 1/01/2010-a.fa,, dated 12.03.2010.
ARQ
Ae Grete war) “P7 ad usa, toad are
Copy to: (1) General Manager (Engq.), All Indian Railways. (ii) Commissioner of Railway Safety, All circles.
)
DDD.
) )
OY
a> Me
4 1 Il It
(~ a. ”
— ian,
om 4 i st? ro
SG? 62
o ___._ SIE ztatiiet_GOVERNMENT OF INDIA
™~ Qa dale MINISTRY OF RAILWAYS
A (aa WSs RAILWAY BOARD)
ne
~N No, 2010/CEDO/SR/18 New Delhi, Dated 11.05.2010
i ~ The Director General/Track,
RDSO, Manak Nagar, mes
~ Lucknow-226011.
~ Sub : Movement-ef-BMRG_coaches_from_Mundra_Port/Pilol
A Raiiway station Gujarat to Badli/ Sahadara, Dethi up
. to maxi speed of GO Kmph on Indian Railways.
- Ref: Your office letter No MC/DMRC, Dated.26.03.2010.
= Vide your letter referred above, Board’s sanction has been sought
a“ for Movement of DMRC coaches from Mundra-Port/Pilol Railway
station Gujarat to Badli/ Sahadara, Delhi up to maximum speed
of 60 Kmph on Indian Railways.
~ However, while processing the proposal, it observed that the
~ speed certificate for running of BG RS-2 DMRC coaches upto max. of 08
i nos. in one consist at maximum speed of 60 kmph‘on IR system is not
~ submitted by RDSO with the proposal. .
A RDSO may kindly arrange to send the above document for further
processing of the case in Board.
(lela BAR
artert Pree / Pate goifarer (a) ery ats
-)
)
)
~w —=
ry hs * wat
he General Manager(Engg.), East Coast Railway Bhubaneswar.
Sub: Bacheli : Condonation of infringing gradient of 1in80 in connection with proposed uniflow dispatch_line_-at—Bacheli_ontCictine—unde Visakhapatnam Division of East Coast Railway. — __
Ref: Your office Letter No CE/C//BBS/NMDC/Bacheli/50A, dt. 19.05.08,
Vide your letter referred above, Board's Condonation has been
sought for infringing gradient -of-1im80-in comnection_with. proposed
uniflow dispatch line at Bacheli on K-K line under
Visakhapatnam Division of East Coast Railway.
However, while processing the proposal, it observed that following
documents/clarifications are required from the Railway :
(i) SWR of Bacheli Staion. (ii) Signature of PCE on the Form -XVII.
x
ECoR may kindly arrange to send the above documents/
clarifications for further processing of the case in Board.
royN og ATL , So a oe. Sia
im a el? . — eo ane arate RAeeHTa GOVERNMENT OF INDIA
7 Wet viata MINISTRY OF RAILWAYS oo (TAGS RAILWAY BOARD)...
No. 2010/CEDO/SD/05 New Delhi, Dated 07.05.2010
PR SRE y | et + Gf Rallwage a Ss “ns Ca.
| . a Pagel . Fey
dao)
yy)
No. 2010/ CEDO/SR/07— wee
«X Wad aati GOVERNMENT OF INDIA aq sia MINISTRY OF RAILWAYS
(aarar “aS RAILWAY BOARD)
The General Manager. (Engg. eon ee en Northern Railway, ~~ Baroda House, New Delhi.
me
” maximiunn” “axle” lee ‘of phboth ‘over:-Northérn Railway at a ~ maximum Spee
In reference t to: above. setter, sanction of: Ministry: of: Railways ae Board is hereby communicated—for Ting BG Bogie Rail: having maximuni axle 20-32¢ for Speed: of. 65 kmph: both conditions as-given:-in-RDS
further-amendment= tie Vor -alolg i sare ertificate Track Certificate: and ot
1.
] Ashok ‘Marg; Lucknow-226001 wert. his
endorsement-no- 05/2010-e.fa,, dated 05:02: 2010: The CRS/Narthern’ Circle, -CRIS_-complex,- Chanakyapuri;-:Delhi-21 w.r.t. his letter No: 2005/Q- “E4(E7)/NC, dated:06.01.2020.- * The Executive Diréctor’ “Standards. {Motive Power), RDSO,_ Lucknow, w.r.t. his letter no. MW/BRHNEHS, dated 24.01.2007 & Amedment No. 1, dated 23.04.2010. Also, please” process “for revision of” enhance ad_s accordingly (i-e: for 75 kph in loaded and 100 kmph in er empty conditions).
Dey him <—y @reile qr) 9/97¢
qa wha, tat ae “Copy to:
(i) General Manager (Engg.), All Indian Railways (except Norther Railway) (if) Commissioner of Railway Safety, All circles (except Northern Circle)
“New v Delhi, ‘Dated 07.05.2010
gie Rall Wagon * ‘type “BRINEHS” having a
—_— os
Mad Banas GOVERNMENT OF INDIA -
yar aiarerel MINISTRY OF RAILWAYS
(Great “ays RAILWAY BOARD) ~
- — ___--—(Mailingtistof CEDO branch)” ~
~
A
i 7 , B
on~
General Manager (Engineering) = “ CCRSICRSS
1|Central Railway, CST Mumbai 1 THE CHIEF COMMISSIONER OF RAILWAY SAFETY, as
DRM, NER COMPOUND, ASHOK MARG,
LUCKNOW-226 001 >
9\Eastem Railway, Kolkata 2 THE COMMISSIONER. OF. RAI
LWAY SAFETY, ~
ce NORTH EASTERN CIR RM OFFICE BLOG
—glNorthem Railway, New Delhi i eS = EUCRNOW 2 001
~
a{North Central Railway, Allanabad 3 FE COMMISSIONER OF RAIEWAY SAFETY. ~
<9 | CENTRAL CIRCLE; 2ND' FLOOR; CHURCHGATE STN.BLDG. ANNEXE,
5|Southem Railway, Chennai M.KRD., MUMBAI-400 020
~
6|South Central Railway, 4 THE COMMISSIONER OF RAILWAY SAFETY,
WESTERN CIRCLE, 2ND-FLOOR CHURCHGATE STN.BLDG. ANNEXE, | ~~
Secunderabad. __ coh = ERD dete" —
South-Eastern Railway; Kolkata renee na >
: THE COMMISSIONER OF RAIEWAY SAFETY,
— EASTERN SIRCLE145 EERO, AZTHELOOR, ~
RAILWAY SAFETY, -
STRAND RD, 12TH FLOOR, J -~
North East Railway, Gorakhpur
42|North Frontier Railway, Guwahati |e
43[North Westem Railway, Jaipur ope ~
14|South East Central Railway, Bilaspur a| THE COMMISSIONER OF RAILWAY SAFETY, o~
a _ |. > | SOUTHERN CIRCLE , 7; SHESHADR! ROAD, GANDHI NAGAR, |
15|South Westem Railway, Hubli : a BANGALORE 560 oe a ae
46|West Central Railway, Jabalpur 3 ~ THE COMMISSION! ORRAILWAY SAFETY, a
--|-°- NORTHEAST FRONTIE RCLE; 14,STRAND ROAD,
“ * * KOLKATA-700 004 |.
‘FA0t THE. COMMISSIONER OF RAILWAY. SAFETY, |
far SOUTH CENTRAL CIRCLE RAIL NILAYAM ~
- SECUNDERABAD-500 371 Lk
~
~
A
a
on
> ft ~ ge . na an, HINT UHR - Ra FATA . Rad ats) ,
No. 2010/CEDO/ORI/4 New Delhi, dated 05.05.2010
The Chief Engineer, Metro Railway, : ‘ Kolkata. :
faya : Opening of newly constructed BG line from Tollygunge
to Briji for public carriage..
wed: Your letter No. MRTS/G-300/21/Pt.Il dated 31.03.2010.
With reference to your letter referred above, it is mentioned that CRS Inspection Report dated 16.10.09 and authorization letter have not been received in Board office. °
It is mentioned that you have furnished the compliance for observations given in the CRS/North Frontier Circle inspection report dated 16.10.09 for few items. 4
The action taken on different item recorded in juxtaposition to the remaining para’s may also be furnished to CRS/North Frontier Circle endorsing a copy to this office. The items not needing any action should be marked “No action. required”.
You are also requested to send copies of CRS Inspection Report dated 16.10.09 alongwith authorization letter to this office for communicating the approval of the opening of the section by the Board.
2A (sire BA)
arden freer / ag. / oh,
Copy to: (i) The Commissioner of Railway Safety/N.F. Circle, 14:Strand Road (12 Floor), Kolkata-700001 w.r.t. his letters No. 3601/1/2009 dated 116.10.09 and No. 3601/1/2009/1157 dated 06.01.10. ©
“(ii) The Chief Commissioner of Railway Safety, DRM, NER Compound, Ashok Marg, Lucknow for information please.
Cle
oy, NTA
Ng gh ot Se
AB Gg
SS \e Loe om GOVERNMENT OF INDIA
yo MINISTRY OF RAILWAYS (RAILWAY BOARD)
Scent _
No.2010/CEDO/ORI/5 ' New Delhi, dated 95.05.2010
The Chief Administrative Officer/Const.,
Eastern Railway,
Kolkata.
Sub: - Opening of new BG Dn main line (non-electrified)
between Dhanauri Station (Km. 397.830 from Khana Jn) and
Uren Station (Km. 391,690 from Khana Station) in connection
with doubling between Kiul and Kajra stations of Malda
Division of Eastern Railway for public carriage of goods and
passengers traffic.
Ref: Your letter __No.__CAO/CON/W/2032/CRSPt.1 dated
21.04.2010. REX
With reference to your letter referred above, it is mentioned that CRS
Inspection Report dated 04.06.09 and authorization letter have not been
received in Board office.
You are requested to send copies of CRS Inspection Report dated
04.06.09 alongwith authorization letter to this office for communicating the
approval of the opening of the section by the Board.
( Alok Kumar ) or] o>
Exec. Director, Civil Engineering (G)
(Railway Board).
Copy to: (i) The Commissioner of Railway Safety/Eastern Circle, 14 Strand
Road (12% Floor), Kolkata-700001 w.r.t. his letters No. 6/1/Z-14/09/27/H
dated 11.05.09 and No. 6/1/Z-14/09/97/H dated 04.06.09.
(ii) The Chief Commissioner of Railway Safety, DRM, NER Compound, Ashok
Marg, Lucknow for information please. eae
| ‘
y 2
yay
2 t
) }
) yiayd
GOVERNMENT OF INDIA Lie MINISTRY OF RAILWAYS (af
RAILWAY BOARD
No.2010/CEDO/SR/09 New Delhi, dated 03.05,2010
Chief Mechanical Engineer N.E. Railway, Gorakhpur
Chief Engineer, N.E. Railway, Gorakhpur
Sub: Operation of AC LHB coaches fitted with pneumatic suspension
at secondary stage on FIAT bogies on track maintained to other
than C&MI Vol.! standard
Ref: NER’s letter No. W/340/LHB Main Line Coaches/4A dated
8.12.2009 & RDSO’s speed certificate vide SV.AS.ML dated
_' 25.08.2009 and CRS, NE circle’s letter’ No. 3499/LHB/
coaches/NE/SANC-04 dated 19.01.2010
Reference above, a proposal has been received from CTE, NE Rly. duly
forwarded through CCRS, Lucknow seeking sanction of Ministry of Railways for
running of generator car, AC-I CC, AC-Il CC, AC-I Sleeper, AC-3 tier (EOG), AC-2
tier (EOG) & AC hot buffet car with 16.25 t axle load LHB main line coaches fitted
with pneumatic suspension at secondary stage on FIAT bogie over N.E. Railway
at a maximum speed of 105 kmph or sectional speed whichever is less.
Board (MT & MM) have observed that sectional speed should govern the speed of
LHB coaches which have potential for speed upto 160 kmph. The sectional speed
of NER system is more than 105 kmph. NER should make a review and process
the case for sanction for maximum permissible speed.
dgrview of above, NER is advised to review the case and submit. revised proposal
_gfor consideration of the Board,.
oN
C —*
(A.K. Singh) - Exec. Dir.Mech.Engg.(Chg.)
Railway Board
Copy to:
ED(Carriage), RDSO, Lucknow — for information and necessary action.
oa
TY
If Wed Bacay GOVERNMENT OF INDIA $
= 5 Bat eal MINISTRY OF RAILWAYS SG (xaer BS RAILWAY BOARD )
No. 2010/CEDO/SR/08 New Delhi, dated 21.04.2010
The General Manager(Engg), Northern Railway, Baroda House, New Delhi.
Sub: Running of Single/Double Headed WDM-2 locomotive fitted with remote control system having maximum axle load of 18.80t over various section of Northern Railway at a maxi. Speed of 105Kmph.
Ref: Your office letter No. 519-W/873,dt:10/11/2009
In reference to above letter, the sanction of the Ministry of Railways, Railway Board is hereby communicated for Running of Single/Double Headed WDMN-2 locomotive fitted with remote control system having maximum axle load of 18.80t over various section of Northern Railway at a maxi. Speed of 105Kmph subject to terms and conditions as given in RDSO’s Speed Certificate and Northern Railway’s Joint Safety Certificate, Track Certificate and other Certificates accompanying above referred letter.
we tot
( T.Gupta ) AL Executive Director Civil Engg.(G)
Railway Board.
No. 2010/CEDO/SR/08 New Delhi, dated 21.04.2610 Copy forwarded for information to:
1, CCRS, Compound of DRM/NER, Ashok Marg, Lucknow -226001 w.r.t. his endorsement No. @e.13011/03/2010- aoftro dt. 05.02.2010
2. The CRS/Northern Circle, CRIS complex, Chanakyapuri, N.Delhi-21 w.r.t. his letter No. 2004/Q-12(13)AWDM-2A/NC/1027-1029 dt. 13.01.2010
3. The Executive Director Standards (Motive Power), RDSO, Lucknow, w.r.t. his letter No. SD.WDM2.11, dt. 31.10.2008.
J oa
(7.Gupta) AL for Secretary, Railway Board.
Copy to: , ~« General Manager (Engg), a
All Indian Railway (except N.Rly foyer s
gS saad aracnre GOVERNMENT OF INDIA 6)F -_ ee begat? Ya aera MINISTRY OF RAILWAYS : NA, t 4 vero" (Jaa WS RAILWAY BOARD ) . A | | a No. 2008/CE-11/TS/10/05 New Delhi, dated 19.04.2010 |
The Chief Commissioner of Railway Safety, compound of DRM/NER, Ashok Marg, Lucknow — 01.
To Nee ree Ps
i Running of of Higher Axle Load (CC+6+2t / CC+8+2t, 25t etc) freight stock on IR.
ee | per Your office letter No. M.15013/01/2010-TW, dt. 11.03.2010
a “swear Vide above referred letter the Commission has asked Board to clarify fp Sg wwhether sanction for running of higher axle load wagons is to be taken for |
each individual case of different Zonal Railways or it is to be taken only first time by one Zonal Railway. | ry
‘
~ Board(ME) have dicided that procedure prescribed vide letter No. | - 92/CEDO/SR/4/0 dated 12/12/1994 will continue to be followed for introducing |
higher axle loads trains on routes approved by Railway Board. . | “~
a In view of above Commission may advice CRSs to deal with the cases | accordingly.
a - ote ~ Executive Director Civil Engg.(G)
for Secretary, Railway Board.
~ Copy to:
a General Manager (Engg), All Indian Railway
oD?
> >
ae)
ye
noe ee Encl: As above. al
ane
er L op} TP SO aera arena GOVERNMENT OF Nag wt
Wet darerer MiniSTRY OF RAILWAYS. 8 GIF. (doer ares’ RAILWAY ¥ BOARD ) © |
No. 2010/CEDO/SR/17. | New Delhi, dated 15.04.2010
The Executive Director (Track) RDSO,Manak Nagar
Lucknow.
Sub: Running of BOYEL & BOXNEL with maximum axle load of 25t on nominated routes of East Coast Railway.
Please find enclosed a copy of CBE/ECoR, Bhubaneswar letter No.
W3/Br/5.7/CRS Corrers./1864 dt. 30.03.2010 , Teparding issue of final speed
certificate.
You may kindly examine the same so that the running of the wagons is not
affected & reply to the Railway accordingly.
—_—"
{ T.Gupta } At Executive Director Civil Engg.(G}
Railway Board. Copy to :-
1 Chief Bridge Engineer, East Coast Railway, Bhubaneswar w.r.t. his letter No. W3/Br/5.7/CRS Corrers./ 1864 dt. 30.03.2010, for information ,
ee meer FRYER
Sz
Wad Bawa GOVERNMENT OF INDIA Ya dialer. MINISTRY OF RAILWAYS
(Wad BS RAILWAY BOARD )
No. 2010/CEDO/SD/04. New Delhi, dated 06.04.2010
The General Manager(Engg),
Central Railway, HQ.Office, CST, Mumbai.
Sub:Badnera: Condonation of infringing gradients of 1in150
(02 nos), 1 in 176,1 in 191.25 , 1 in 209.424 (02 nos) in
connection with proposed chord line connecting
Mumbai-Nagpur main line to Badnera -Amravati
branch line between Bhusawal-Badnera section of Bhusawal Division of Central Railway.
Ref: Your office.Letter. No. EW.221,.W.47,.dt10.02,2040—_____.
Vide your letter referred above, Board's Condonation has been sought
for infringing gradients of various sections of Bhusawal Division
of Central Raiiway.
However, while processing the proposal, it observed that following
_ documents/clarifications are required from the Railway : \
(i) SIP of Badnera Yard/Staion.
(ii) SWR of Badnera station.
(iii) The Kilometrage/Chainages should be given uniformly in Plan &
Form-XVII
Central Railway may kindly arrange to send the same to “enable for
further processing of the case In Board.
te 7 ?7—
(T. Gupta)
Executive Director, Civil Engg. (G)
‘at C. Railway. Board.
Bie
Le
GOVERNMENT OF INDIA 1S MINISTRY OF RAILWAYS
(RAILWAY BOARD)
0. 2004/CEDO/ORI/73. New Delhi, dated 2» .03.2010
The Chief Commissioner of Railway Safety, DRM NER Compound, Ashok Marg, Lucknow-226001.
Sub: Opening of the newly converted BG line between Bharatpur-Bandikui section of Agra division of North Central Railway for public carriage of passengers.
Ref:(iJCCRS’s Letter No. R. 12040/03/2004-RS dated 20.08.04
{ii)CRS’s (Western Circle) letter No. 800/1/OPG/PT/(H)}311
dated 13.07.04
With reference to your endorsement R. 12040/03/2004-RS dated 20.08.04, the approval of Ministry of Railways is hereby communicated to the recommendation of Commissioner of Railway Safety, Western Circle, Mumbai for opening of the above section for public carriage of passengers as per his letter No. 800/1/OPG/PT/(H)311 dated 13.07.04.
J _
{ T.Gupta ) L La Executive Director Civil Engg.(G)
bi Railway Board.
No. 2004/CEDO/ORI/73. New Delhi, dated ) .03.2010
Copy forwarded for information to:
(i) The Commissioner of Railway Safety, Western Circle, 274 Floor, Churchgate Stn. Bldg. Annexe, -M.K: Road, Mumbai-400020, w.r.t. his letter No.
800/1/OPG/PT/({H}311 dated 13.07.04. (ii) The Chief Administrative Officer (Const.}, North Western Railway, Jaipur. (iii]The General Manager (Engg), North Western Railway, Jaipur.
ere ce qe et
{ stiristy * a ae mr J
aly ( T.Gupta ) aly oat q fs ae
sere for Railway
Board. _
et)
aaa . a oo
|Rgnats
Sea BTeHIe GOVERNMENT OF INDIA Gl F Yat sigicta MINISTRY OF RAILWAYS
ape ey (Aaa ws RAILWAY BOARD )
No. 2010/CEDO/SR/12 New Dethi, dated 30.03.2010
The General Manager/Engg, South Eastern Railway,
Kolkata-43.
Sub: Running of Triple Headed WDG3A(earlier named as WDG2) class of tocomotive conforming to RDSO’s drawing No. 43.01.01 Alt.-b and SK.VL-033 with a maximum axle load of 20.5t over South Eastern Railway.
Ref: Your letter No. G/Loco/WDG2/Pt. III, dt: 19.01.2010
With reference to your above application, sent through the Chief Commissioner of Railway Safety, Lucknow, the sanction of Ministry of Railways, Railway Board is hereby communicated for Running of Triple Headed WDG3A(earlier named as WDG2) class of locomotive conforming to RDSO’s drawing No. 43.01.01. Alt.-b.and_SK.VL-033. witha maximum axle load of 20,5t over
South Eastern Railway subject to terms and conditions as given in RDSO’s Final Speed Certificate and SE Railway’s Joint Safety Certificate, Track Certificate and other Certificates accompanying above referred letter .
( t.dupta ) Executive Director Civil Engg.(G)
Railway Board.
No. 2010/CEDO/SR/12 New Delhi; dated 30.03.2010
Copy forwarded for information to: - 1. The Chief Commissioner of Railway Safety, compound of DRM/NER, Ashok
Marg, Lucknow — 01 w.r.t. his endorsement No. 79,1304 1/10/201¢ O- aofto dt.
12.03.2010 : 2. The Commissioner of Railway Safety, South Eastern Circle, 14, Strand Road
(12 th Floor), Kolkata — 001 w.r.t. his endorsement No.1351, dt.16.02.2010
3. The Executive Director Standards (Motive Power), RDSO, Lucknow, w.r.t. his letters
No. SD.WDG2.11, dt. 20.06.2008 .
a
CZ pervws (T. upta)
Minisrry eM for Secretary, Railway Board.
we
: whi J ee ae “oF “t
esas ott oe ; seers een P
GOVERNMENT OF INDIA , MINISTRY OF RAILWAYS ,
(RAILWAY BOARD)
No. 2007/CEDO/ORI/24. New Dethi, dated,7 ) .03.2010
The Chief Commissioner of Railway Safety, DRM NER Compound, Ashok Marg, Lucknow-226001.
Sub: Opening of the converted BG line between Tiruchchirapalli (excl) ~Pudukkottai (incl) stations (from Km 405.563 to Km 457.663) for a length of 52.10 Kms in Maduari division of Southern Railway for public carriage of passengers
Ref:(i}CCRS’s Letter No. R. 12037/1/2007-TW dated 05.04.07 (iiJ/CRS’s (Southern Circle) letter No. R. 12037/8/2006 SR/2479-90 dated 22.01.07 a -
eneee
With reference to your endorsement No. R. 12037/1/2007-TW dated 05.04.07, the approval of Ministry of Railways is hereby communicated to the recommendation of Commissioner of Railway Safety, Southern Circle, Bangalore for opening of the above section for public carriage of passengers as per his letter No. R. 12037/8/2006.SR/2479-90 dated 22.01.07.
ian
* crdagea ‘ fe Executive Director Civil Engg.(G)
Railway Board.
New Delhi, dated.25~03.2010
Copy forwarded for information to:
(i) The Commissioner of Railway Safety, Southern Circle, 7, Seshadri Road, Gandhinagar, Bangalore-560009, w.r.t. his letter No. R. 12037/8/2006 SR/2479-90 dated 22.01.07.
(ii) The Chief Administrative Officer (Const.), Southern Railway, Chennai. (iii}/The General Manager (Engg), Southern Railway, Chennai.
I ( ndlupta )
for Secretary, Railway Board.
) d
‘273
~ i}
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS
(RAILWAY BOARD)
No. 2007/CEDO/ORI/24. New Dethi, dated,” ).03.2010
The Chief Commissioner of Railway Safety, DRM NER Compound, Ashok Marg, Lucknow-226001.
Sub: Opening of the converted BG line between Tiruchchirapalli (excl) -Pudukkottai (incl) stations (from Km 405,563 to Km 457.663) for a length of 52.10 Kms in Maduari division of Southern Railway for public catriage of passengers
Ref:(iJ)CCRS’s Letter No. R. 12037/1/2007-TW dated 05.04.07 (ii)CRS’s (Southern Circle) letter No. R. 12037/8/2006 SR/2479-90 dated 22.01.07 . a
bones
With reference to your endorsement No. R. 12037 /1/2007-TW dated 05.04.07, the approval of Ministry of Railways is hereby communicated to the recommendation of Commissioner of Railway Safety, Southern Circle, Bangalore for opening of the above section for public carriage of passengers as per his letter No. R. 12037/8/2006.SR/2479-90 dated 22.01.07.
o_o
( nelajte } ; CC Executive Director Civil Engg.(G)
Railway Board.
New Delhi, dated.25.03.2010
Copy forwarded for information to:
(i) The Commissioner of Railway Safety, Southern Circle, 7, Seshadri Road, Gandhinagar, Bangalore-560009, w.r.t. his letter No. R. 12037/8/2006 SR/2479-90 dated 22.01.07.
(ti) The Chief Administrative Officer (Const.), Southern Railway, Chennai. (iii)The General Manager (Engg), Southern Railway, Chennai.
J u——
(T.Gupta) |
for Secretary, Railway Board.
PLD
D2
Dey dD
you)
‘\
yy
yay
& }
Wad ater GOVERNMENT OF INDIA s2 e —
at dialer’ MINISTRY OF RAILWAYS GIF
(Fara Wrs RAILWAY BOARD )
No. 2009/CEDO/ SD/18 New Delhi, dt 17.03.2010
The General Manager/Engg.,
_ Central Railway, ‘Mumbai CST-400001
Sub:Talegqaon: Condonation of infringing gradients of 1 in 300 (at. kms 156.460 to 156.900) and 1 in 150 (at kms 157.520 to 157.900) at Talegaon station-in connection with removal of slip siding between LNL-PA section of Pune Division of Central Railway.
Ref: Your office Letter No PCE/CRS/II, dt.04.03.2010.
Kindly refer to Board’s letter of even. number dt. 16.12.2009
wherein two observations were conveyed to the Rly for compliance.
However vide your letter referred above no comments have been
made regarding the observation for obtaining the condonation of the
gradient of 1 in 300 from CRS of the Rly.
The Railway is requested to send the comments for further
i, processing, of the case.
rab te 4 ve re ‘ we . a . . . 1 . : :
a ce 0 cot a Raitt
. ?
. * - (T. Gupta) Executive Director, Civil Engg. {G)
' Railway Board.
AMAR nos em amen ing, ptt
£47 REIN
Maury of Reiuays in ate
Rgsrd
Yeo are n uclosure
O_o wren ree PER Pant tr, ‘ x
. st : gtr
a
“A ¥ pee - res
“ ae Sao
LES GOVERNMENT OF INDIA - 1 . MINISTRY_OF RAILWAYS
& (RAILWAY BOARD)
_ No. 2009/CEDO/ORI/11. New Delhi, dated /0.03.2010
- The Chief Commissioner of Railway Safety, ™~ DRM NER Compound, Ashok Marg,
. Lucknow-226001. “ns
“~ Sub: Opening of the newly laid BG double line between
= Nidavanda (Km. 47/500) and Tumkur (Km. 70/100) in Ne "Bangalore division of South Western Railway for public A oe carriage of passengers: ——-
“ Ref:(iJCRS’s (Southern Circle) letter No. R. 12027/6/2008- ° SWR Vol. 11/079 dated 13.04.2009 ~ :
oN
. . The approval of Ministry of Railways is hereby communicated to the mn recommendation of Commissioner of Railway Safety, Southern Circle,
Bangalore for opening of the above section for public carriage of passengers as - per his letter No. R. 12027/6/2008- SWR Vol. 11/079 dated 13.04.2009.
“~~ u 2
- { T.Gupta ) - (- Executive Director Civil Engg.(G)
. Railway Board. rn
;
No. 2009/CEDO/ORI/11. New Delhi, dated /g .03.2010
Copy forwarded for information to:
{i) The Commissioner of Railway Safety, Southern Circle, 7, Seshadri Road, Gandhinagar, Bangalore-560009, w.r.t. his letter No. R. 12027/6/2008-
SWR Vol. 11/079 dated 13.04.2009 (ii) The Chief Administrative Officer (Const.), SW Railway, Bangalore. (iii)The General Manager [Engg};-8W Railway, Hubli.
an Te
fp eo
-( T.Gupta ) for Secretary, Railway Board.
A
POY
§v eT
Ge
|? GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS (RAILWAY BOARD)
No. 2009/CEDO/ORI/8. New Delhi, dated /g .03.2010
The Chief Commissioner of Railway Safety,
DRM NER Compound, Ashok Marg,
Lucknow-226001.
Sub: Opening of the newly laid BG line of 5.452 Kms. forming
Up line of Double line between Hospet and Kariganuru
Stations ‘of -section-in- Hubli-division -of South Western
Railway-for-public-carriage-of passengers...
Ref:(iJCRS’s (Southern Circle) letter No. R. 12027/3/2007-
SWR dated 06/07.10.2008
The approval of Ministry. of Railways is hereby communicated to the
recommendation of Commissioner of Railway Safety, Southern Circle,
Bangalore for opening of the above section for public carriage of passengers as
per his letter No. R. 12027 /3/2007- SWR dated 06/07.10.2008.
Gapta) ( T.Gupta )
Executive Director Civil Engg.(G)
C- Railway Board.
No. 2009/CEDO/ORI/8. New Delhi, dated/2 .03.2010
Copy forwarded for information to:
ay Safety, Southern Circle, 7, Seshadri Road, (i) The Commissioner of Railw:
No. R. 12027/3/2007- Gandhinagar, Bangalore-560009, w.r.t. his letter
SWR dated 06/07.10.2008
(ii) The Chief Administrative Officer (Const.), SW Railway, Bangalore.
(iii/The General Manager (Engg), SW Railway, Hubli.
| Tiga ) for Secretary, Railway Board.
ids
“>
fy
8 \ GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS (RAILWAY BOARD)
No. 2009/CEDO/ORI/9. New Delhi, dated /¢ .03.2010
The Chief Commissioner of Railway Safety,
DRM NER Compound, Ashok Marg,
Lucknow-226001.
Sub: Opening of the newly laid BG line forming Double Line
from Kariganuru (Km. 149.610) to Bayaluvoddigeri (Km.
161.53) in Hubli division of South Western Railway for
public carriage of passengers.
Ref:(i)CRS’s (Southern Circle) letter No. R. 12027 /3/2007-
SWR/2618 dated 14.03.2008 onceer
The approval of Ministry of Railways is hereby communicated to the
recommendation of Commissioner of Railway Safety, Southern Circle,
Bangalore for opening of the above section for public carriage of passengers as
per his letter No. R. 12027 /3/2007- SWR/2618 dated 14.03.2008.
1
( T.Gupta )
Executive Director Civil Engg.(G)
( Railway Board.
No. 2009/CEDO/ORI/9. New Delhi, dated /p .03.2010
Copy forwarded for information to:
Southern Circle, 7, Seshadri Road, (i) The Commissioner of Railway Safety,
No. R. 12027/3/2007- Gandhinagar, Bangalore-560009, w.r.t. his letter
SWR/2618 dated 14.03.2008
(ii) The Chief Administrative Officer (Const.), SW Railway, Bangalore.
Te a
( T. pta )
ae aso x
igpue Y aT
for Secretary, Railway Board.
[&
an
RK Sir af V, \?
rAyY GOVERNMENT OF INDIA MINISTRY OF RAILWAYS
(RAILWAY BOARD)
os No. 2009/CEDO/ORI/ 12. New Delhi, dated 9 403.2010
7
The Chief Commissioner of Railway Safety, a DRM NER Compound, Ashok Marg,
Lucknow-226001.
MN
_ Sub: Opening of newly constructed BG Dn line (electrified) between Baruipur Jn. station {Km. 24.740) and
~ Dhapdhapi station (Km. 31.330) as part of doubling ~ project on Sealdah division of Eastern Railway for public s carriage of goods and passenger traffic. os
” Ref; (i)CRS’s (Eastern Circle) letter No. 607/1/A/08/587/H a dated 27.10.08 Po a
ms The approval of Ministry of Railways is hereby communicated to the recommendation of Commissioner of Railway Safety, Eastern Circle, Kolkata for
~ opening of the above section for public carriage of passengers as per his letter = No. 607/I/A/08/587/H dated 27.10.08, <7 ‘ | _
=“ “ ? CU
a i AQ { T.Gupta ) - a Executive Director Civil Engg.(G)
- ae (x6 Railway Board. AE a te {repeDee
> No. 2009/CEDO/ORI/12, ces ce eee tte sal New Delhi, dated 24.03.2010
- Copy forwarded for information to:
(i) The Commissioner of Railway Safety, Eastern Circle, 14, Strand Road, (12t Floor}, Kolkata-700001, w.r.t. his letter No. 607 /1/A/08/587/H dated
~ 27.10.08. * (ii) The Chief Administrative Officer (Const.), Eastern Railway, Kolkata.
(iii)The General Manager (Engg), Eastern Railway, Kolkata.
~ , v 2
( T.Gupta ) for Secretary, Railway Board.
4 Sad aecntae GOVERNMENT OF INDIA Se Yor vaera MINISTRY OF RAILWAYS O/F_
(Waa BS RAILWAY BOARD )
No. 2010/CEDO/ SR/04 New Delhi, dt 26.02.2010
The General Manager/Engg., South Central Railway,
Secunderabad.
Sub: Running of “WDM-3D” (Single/Multiple) class of locomotives
{without equalizer) with HAHS bogie on track maintained to
other than C&M-1 Vol. standard with a maximum speed of
105kmph over South Central Railway.
Ref: Your office Letter No W/469/WDM3D. Vol.I dt.03.12.2009.
Vide your letter referred above, Board’s sanction has been sought for
Running of “WDM-3D" (Single/Multiple) class of locomotives (without equalizer)
with HAHS bogie on track maintained to other than C&M-1 Vol.| standard with a
maximum speed of 105kmph over South Central Railway. However, while
processing the proposal for Board’s approval, Board (ML) has passed the following
remarks:
«“ it may be got clarified from S.C.Railway that in
Vikarabad-Parli section ( & similar section} where loop line & point
zones are not track- circuited, whether or not this sanction would
apply to these locos in multiple & if so, whether there wiil be
adequate margin for ensuring clearance of trailing pts./fouling
marks.”
SC.Rly is requested to send the necessary clarification so that
the case can be processed further.
a 2
(T. Gupta) Executive Director, Civil Engg. (G)
Railway Board.
wei
ae
thes ae \: Enclezusa
Te en cence pr
~~
an
axe | wo ae
oe AE
Co ~ Ou a a se J
_ GOVERNMENT OF INDIA . 2 MINISTRY OF RAILWAYS
~ (RAILWAY BOARD)
No. 2009/CEDO/ORI/6. New Delhi, dated //.02.2010
* The Chief Commissioner of Railway Safety, me DRM NER Compound, Ashok Marg, pA Lucknow-226001.
-_ Sub: Opening of new Dn main line BG section after doubling . between Uren and Kajra station of Malda Division of = Eastern Railway for public carriage of passenger traffic.
° Ref:(i)CRS’s (Eastern Circle) letter No. 6/1/Z-12/07 dated N 20.08.08
aA eoeee
An The approval of Ministry of Railways is hereby communicated to the ~ recommendation of Commissioner of Railway Safety, Eastern Circle, Kolkata for ~ opening of the above section for public carriage of passengers as per his letter . No. 6/1/Z-12/07 dated 20.08.08.
~ ( nakete) ” Executive Director Civil Engg.(G) rn Railway Board.
a No. 2009/CEDO/ORI/6. New Delhi, dated // .02.2010
. Copy forwarded for information to:
“ (i) The Commissioner of Railway Safety, Eastern Circle, 14, Strand Road, (12th
C Floor), Kolkata~-700001, w.r.t. his letter No. 6/1/Z-12/07 dated 20.08.08. ~ {ii) The Chief Administrative Officer (Const.), Eastern Railway, Kolkata. . (iti/The General Manager (Engg), Eastern Railway, Kolkata. ~
= - ee arate o | ahuistey Mg Railways Te “0 — . ma
Saat on ( T.Gupta )} for Secretary, Railway Board.
a eR tt
Tg cE
Ve o~ e™
war - ne o \ e
Be * GOVERNMENT OF INDIA ~ ~ MINISTRY OF RAILWAYS
(RAILWAY BOARD) ™
. No, 2006/CEDO/ORI/20. New Delhi, dated /(.02.2010
" The Chief Commissioner of Railway Safety, ° DRM NER Compound, Ashok Marg, “ Lucknow-226001.
-N
Yo)
\
Sub: Opening of the new BG Up line between Kuttipuram (excl) and Pallipuram (incl) stations (from Km. 607.665 to Km. 602.250 and from Km. 600.260 to Km. 598.500 for a length of 7.175 Kms) in Palghat division of Southern Railway for public carriage of passengers.
Ref:(i)CCRS’s Letter No. R. 12027/01/2006-CCRS dated 19.04.06
{ii)CRS’s (Southern Circle) letter No. R. 12027/1/2006 SR/3359-68 dated 28.03.06
ences
With reference to your endorsement No. R. 12027 /01/2006-CCRS dated 19.04.06, the approval of Ministry of Railways is hereby communicated to the recommendation of Commissioner of Railway Safety, Southern Circle, Bangalore for opening of the above section for public carriage of passengers as per his letter No. R. 12027/1/2006 SR/3359-68 dated 28.03.06.
Se { T.Gupta ) oO Executive Director Civil Engg.(G) (- Railway Board.
No. 2006/CEDO/ORI/20. New Delhi, dated /{ .02.2010
Copy forwarded for information to:
(i) The Commissioner of Railway Safety, Southern Circle, 7, Seshadri Road, Gandhinagar, Bangalore-560009, w.r.t. his letter No. R. 12027 /1/2006 SR/3359-68 dated 28.03.06.
(ii) The Chief Administrative Officer (Const.), Southern Railway, Chennai. (iii)The General Manager (Engg), Southern Railway, Chennai.
— <a le
sete OF Reiiwaye phnistey G UF
( T.Gupta ) for Secretary, Railway Board.
—™~
ye x a OLS GIF — “gy Gy) z pat an 0
2 < GOVERNMENT OF INDIA . we’ MINISTRY OF RAILWAYS . (RAILWAY BOARD)
tf
- No. 98/CEDO/ORI/50. . New Delhi, dated /{ .02.2010
~ The Chief Commissioner of Railway Safety, DRM NER Compound, Ashok Marg,
a Lucknow-226001.
= Sub: Opening of new Dn line between Banpas and Noadar Dhal _ stations in Howrah division of Eastern Railway of the . public carriage of passengers. a ~ Ref:(i)CCRS’s Letter No. R. 12022/3/98-RS dated 14.12.98 “ (ii)CRS’s (Eastern Circle} letter No. 6/1/Z-1/98/608 dated - 16.11.98
o~
. With reference to your endorsement No. R. 12022 /3/98-RS dated ™~ 14.12.98, the approval of Ministry of Railways is hereby communicated to the
r. recommendation of Commissioner of Railway Safety, Eastern Circle, Kolkata for . opening of the above section for public carriage of passengers as per his letter
~ No. 6/1/Z-1/98/608 dated 16.11.98.
fs Capea) ns { T.Gupta ) _ Executive Director Civil Engg.(G) - Railway Board.
: No. 98/CEDO/ORI/50. New Delhi, dated /; .02.2010
x Copy forwarded for information to:
~ (i} The Commissioner of Railway Safety, Eastern Circle, 14, Strand Road, (12th Floor), Kolkata-700001, w.r.t. his letter No. 6/I/Z-1/98/608 dated
i. 16.11.98. ~ (ii) The Chief Administrative Officer (Const.), Eastern Railway, Kolkata.
. (iti) The General Manager (Engg), Eastern Railway, Kolkata. w™
> a a 7 ic — . _ renneens a ma) %oR ( T.Gupta ) ~ “hy ‘ VY soar for Secretary, Railway Board. . aan > ates aT —_™
~ mee —
in e
™
~ wn ‘ . tS Sap ui
G/F gid ataclae GOVERNMENT OF INDIA
Ja gialeta MINISTRY OF RAILWAYS
(aa BS RAILWAY BOARD )
No. 2010/CEDO/SD/03. New Delhi, dated 16.02.2010
The General Manager(Engg), Eastern Railway,
Kolkata.
Sub: Condonation to horizontal infringement to FOB at Dhakuria
at Km 6.20 of Sealdah South-Sonarpur section of Sealdah
division of Eastern Railway.
Ref: Your office letter No. W(3)591/2 dt.14.12.2009
With reference to your letter referred above, sent through the Chief
Commissioner of Railway Safety, Lucknow, the sanction of Ministry of
Railways, Railway Board is here by communicated for Condonation to
horizontal infringement to FOB at Dhakuria at Km 6.20 of Sealdah
South-Sonarpur section of Sealdah division of Eastern Railway as
shown in Form-XVIL and drawings enclosed with above referred application.
a2
( T.Gupta )
Executive Director Civil Engg.(G)
Railway Board.
No. 2010/CEDO/SD/03. New Delhi, dated 16.02.2010
Copy forwarded for information to :
4. The CCRS, Ashok Marg, Lucknow w.r.t. his endorsement No. .F4,12019/01/2010- aoftio
dated 18.01.2010 ,
2. The CRS/Eastern Circle, 14, Strand Road, 42" floor, Kolkatta-O1 w.r.t. his letter No. 607/
LV /infringement/09/882/H dated 06.01.2010.
2
(T. Gupta)
for Secretary, Railway Board
rc
os; oon
Kt YP
oe Ge : RS ‘od Wiad ataaia GOVERNMENT OF INDIA
ab Qa sae MINISTRY OF RAILWAYS a (Fad ars RAILWAY BOARD )
. No. 2009/CEDO/SD/19. New Dethi, dated 16.02.2010
7 The General Manager(Engg),
- Central Railway, HQ.Office, x CST, Mumbai. ~
_ Sub: Condonation of infringements in connection with the
work of CSTM-Remodelling of main line complex-
proposed transfer line (7 line) between CSTM and
rs Wadibunder and connected works such as Rebuilding
of Masjid ROB, Elphinstone ROB, Chinchbunder FOB
and elevated booking office at Masjid station of
7 Mumbai Division of Centra? Railway.
ws
— With reference to your letter referred above, sent through the Chief
~ Commissioner of Railway Safety, Lucknow, the sanction of Ministry of
~ Railways, Railway Board is here by communicated for Condonation of
~ infringements in connection with the work of CSTM-Remodelling of main line
“ complex- proposed transfer line (7"™ line) between CSTM and Wadibunder
a and connected works such as Rebuilding of Masjid ROB, Elphinstone ROB,
Chinchbunder FOB and elevated booking office at Masjid station of Mumbai
Division of Central Railway as shown in Form-XVII and drawings enclosed
with above referred application subject to the condition that:
’ "No goods train should run through these yards”.
™
+ Way
= ( T.Gupta ) Executive Director Civil Engg.(G)
- Railway Board. om
. :
No. 2009/CEDO/SD/19. New Delhi, dated 16.02.2010
Miniarey 6 wa P &f, Compound of DRM/NER, Ashok Marg, Lucknow —226001
LO se _ fis endorsement No.te&11012/08/2009- cof dt. 27.11.2009.
ON ot ods Inissioner of Railway Safety, Central Circle, “29 Floor,
ene --+ —@werchgate Stn. Bidg. Annexe, M.K. Road, Mumbai + 400 9020
Vigestire aM abet fletter no. C-13(194)/2008-556, dated 18.11.09.
ae Oy a _—| - [note OE WABI oy essences meemerts samy , uf ee
for Secretary, Railway Board Be ET OE ied
ios
Ns a yee Nard ABaHae GOVERNMENT OF INDIA 4
as A Wet sisreta’ MINISTRY OF RAILWAYS S/F ~“,
aa (ara WS RAILWAY BOARD ) THA” |
™ No. 2010/CEDO/SR/10 New Delhi, dated 16.02.2010
° The General Manager/Engg, r, West Central Railway , : Jabalpur ”.
Sub: Running of WDM3E class of locomotives re-designated as
o WDM3D_ (without equalizer) with HAHS bogie with a maximum axle load of 19.7t over entire BG section of
West Central Railway at maxi. Speed of 105Kmph & 120
” Kmph on track maintained to C&M-I Vol.-I standards. Ref: Your letter No.W-HQ/311/BR/CRS/WDM3E /159,dt. 09.12.2009
“ With reference to your above application, sent through the Chief
Commissioner of Railway Safety, Lucknow, the sanction of Ministry of
Railways, Railway Board is hereby communicated for Running of WOM3E
~ class of locomotives re-designated as WDM3D (without equalizer)
with HAHS bogie with a maximum axle load of 19.7t over entire BG
Oo section of West Central Railway at maxi. Speed of 105Kmph & 120
7 Kmph on track maintained to C&M-I Vol.-I standards subject to terms
and conditions as given in RDSO’s Provisional Speed Certificate and West
. Central Railway's Joint Safety Certificate, Track Certificate and other
A Certificates accompanying above referred letter .
“~s , 0 —
- ( T.Gupta ) Executive Director Civil Engg.(G)
°C Railway Board.
_ No. 2010/CEDO/SR/10 New Delhi, dated 16.02.2010
“ Copy forwarded for information to :- _ 4. The Chief Commissioner of Railway Safety, compound of DRM/NER, Ashok Marg, Lucknow
™~ — 226001 w.r.t. his endorsement No.ez,.13011/45/2009-avfto dt. 05.02.2010
- 2. The Commissioner of Railway Safety, Central Circle, 2" floor, Churchgate Stn. Bidg.
: Annexe, M.K. Road, Mumbai — 020 w.r.t. his letter No. C-11(199)/2009-23dt. 08/11-01-2010
o . %. The Executive Director Standards (Motive Power), RDSO, Lucknow, w.r.t. his letter No.
” SD.WDM3E.11, dt. 10.06.2009. m"~
4 rr (T.Gupta)
o 0 Cc for Secretary, Railway Board.
~ - T TFT
> gan LAG Roard
~ At fifa are an i} Enclesuga
~~ geware
_
ky
Ns yj Ms
/ yl ce
eo 4 “le 2" GOVERNMENT OF INDIA a ~ MINISTRY OF RAILWAYS
(RAILWAY BOARD) =~
- No. 2006/CEDO/ORI/20. New Delhi, dated //.02.2010 cm
a The Chief Commissioner of Railway Safety, “. DRM NER Compound, Ashok Marg, sn Lucknow-226001,
o Sub: Opening of the new BG Up line between Kuttipuram (excl) ~ and Pallipuram (incl) stations {from Km. 607.665 to Km.
- 602.250 and from Km. 600.260 to Km. 598.500 for a 7 length of 7.175 Kms) in Palghat division of Southern a Railway for public carriage of passengers.
~ Ref:(iJ)CCRS’s Letter No. R. 12027/01/2006-CCRS dated 19.04.06
” (ii)CRS’s (Southern Circle) letter No. R. 12027/1/2006 ~ SR/3359-68 dated 28.03.06
~
7 With reference to your endorsement No. R. 12027/01/2006-CCRS dated 7 19.04.06, the approval of Ministry of Railways is hereby communicated to the ~ recommendation of Commissioner of Railway Safety, Southern Circle,
~. Bangalore for opening of the above section for public carriage of passengers as ~ per his letter No. R. 12027/ 1/2006 SR/3359-68 dated 28.03.06.
“ws
a ( T.Gupta ) 2 Executive Director Civil Engg.(G)
“ L- Railway Board.
No. 2006/CEDO/ORI/20. New Deihi, dated /{ .02.2010 ~
Copy forwarded for information to: —s
'
> (i} The Commissioner of Railway Safety, Southern Circle, 7, Seshadri Road, Gandhinagar, Bangalore-560009, w.r.t. his letter No. R. 12027/1/2006
- SR/3359-68 dated 28.03.06. ~ (ii) The Chief Administrative Officer (Const.), Southern Railway, Chennai.
(iii)/The General Manager (Engg), Southern Railway, Chennai.
o~ sion y of Railways J ~ Tere SS ( T.Gupta )
. 2 for Secretary, Railway Board.
Mad awa GOVERNMENT OF INDIA Qt dialer MINISTRY OF RAILWAYS
(%aa AS RAILWAY BOARD )
No. 2010/CEDO/ SD/01 New Delhi, dt. 12.02.2010
The General Manager(Engg). Southern Railway, HQ. Office, Chennai-600 003
Sub: Condonation to vertical infringement at three locations for the existing engineering structures due to electrification of Tiruchchirapalli-Dindigul section of MDU division of Southern Railway.
Ref: Your office Letter No 573/RE/7 dt. 18.11.2009
With reference to your letter referred above, sent through the Chief Commissioner of Railway Safety, Lucknow, the sanction of Ministry of Railways, Railway Board is hereby communicated for Condonation to vertical infringement at three locations for the existing engineering
structures due to electrification of Tiruchchirapalli-Dindigul section of MDU division of Southern Railway as shown in Form-XVII and
drawings enclosed with above referred application.
tT
(T. Gupta) Executive Director, Civil Engg. (G)
Railway Board.
No. 2010/CEDO/ SD/01 New Delhi, dt. 12.02.2010 Copy forwarded for information to:
(i) The Chief Commissioner of Railway Safety, compound’ of DRM/NER, Ashok Marg, Lucknow — 226001 w.r-t, his endorsement No. e,.11017/07/2009- aoftio dt. 18.12.2009
(ii) C.R.S./Southern Circle, No.7, Seshadri Road, Gandhinagar, Bangalore-560 009 w.r.t. his letter No.Q.11017/1/2009-10/05/ SR/1335 dt.01.12.2009.
uv ?____—
(T.Gupta)
for Secretary, Railway Board.
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS
(RAILWAY BOARD)
No.99/CEDO/ORI/26 New Delhi, dated $7 02.2010
The Chief Engineer/Con/I,
Eastern Railway,
Kolkata.
Sub: Opening of the new Dn line Guskara and Pichkurirdhal stations in Howrah division of Eastern Railway for the public carriage of passengers.
Ref: Your letter No. CAO/CON/W/CRS/ Misc dated 04.01.2010. waKK
With reference to your letter referred above, compliance for observations given in the CRS/Eastern Circle inspection report dated 26.08.99 for the items numbered as 4.1, 6.3, 6.4, 7.3, 9.6, 9.7, 10.2, 10.3, 10.8, 12.1, 12.2., 13.1, 13.2 and 13.3 is not satisfactory.
You are requested to take necessary action to comply with above observations.
The action taken on different item recorded in juxtaposition to the above para’s may also be furnished to CRS/Eastern Circle endorsing a copy to this office.
of. 2
{ T.Gupta )
Exec. Director, Civil Engineering (G) (Railway Board).
(RAILWAY BOARD)
\ ~ hee - GOVERNMENT OF INDIA G-F te Le 49 MINISTRY OF RAILWAYS a
s\" | No.2010/CEDO/ORI/2 New Delhi, dated § .02.2010
The Chief Administrative Officer (Const.), South Western Railway, Bangalore.
Sub: -Opening of newly laid line forming double line between Hubli Jn. and Hebsur of Hubli Division on South Western Railway for public carriage of passengers.
Ref: i) CRS/Southern /Bangalore’s letter No. R, 12027 /2/2009-SWR/ 1737-49 dated 15.01.2010.
eee
The above section was inspected by CRS/Southern Circle/Bangalore on 14.12.2009 and opening of the section was authorized by him vide his letter No. R. 12038/3/07/SWR dated 22.12.2009 with certain observations. The inspection report has been sent to this office with a copy to you.
You are requested take necessary action to comply with the various observations made in his above letter for opening the section.
The action taken on different items recorded in the juxta position to the above document may be furnished to CRS /Southern Circle, endorsing a copy to this office for communicating the approval of the opening of the section by the Board. J
L- Exec.Director, Civil Engineering (G) (Railway Board),
No.2010/CEDO/ORI/2 New Delhi, dated ¢ .02.2010
Copy forwarded for information to the Commissioner of Railway Safety, Southern Circle, No.7, Seshadri Road, Gandhinagar, Bangalore-560009 with reference to their letter No. R. 12027 /2/2009-SWR/ 1737-49 dated 15.01.2010.
wt +
( T.Gupta ) For Secretary, Railway Board
ee wo _ fakes
aglesws 6
Sige. ceseserevanae :
er eae Mie waten, RET eae cick cg oe % weet F dn oe mere
A o sed ateeTT GOVERNMENT OF INDIA owe S
Wa aiaicial MINISTRY OF RAILWAYS (ae BF RAILWAY BOARD )
No. 2010/CEDO/SD/02. New Delhi, dated 05.02.2010
The General Manager(Engg), Western Railway, Churchgate, Mumbai-20.
Sub: Borivali - Condonation of stipulation of SOD for conversion of existing platform No. 6 into island platform No. 6 & 6A and provision of home platform No. 6A for receipt and despatch facility on line No. 6 & 7 of Mumbai Division of Western Railway.
Ref: Your office letter No. W.566/4/BVI dt.29.12.09
With reference to your letter referred above, sent through the Chief Commissioner of Railway Safety, Lucknow, the sanction of Ministry of Railways, Railway Board is here by communicated for condonation of infringement to IR(BG)SOD Revised,2004 at Borivali station for conversion of existing platform No. 6 into island platform No. 6 & 6A and provision of home platform No. 6A for receipt and despatch facility on line No. 6 & 7 of Mumbai Division of Western Railway as shown in Form-XVII and drawings enclosed with above referred application .
——
( ¥.Gupta )
of Executive Director Civil Engg.(G) c Railway Board.
No. 2010/CEDO/SD/02. New Delhi, dated 05.02.2010
Copy forwarded for inforrnation to:- 1. The Chief Commissioner of Railway Safety, compound of DRM/NER,
Ashok Marg, Lucknow - 226001 w.r.t. his endorsement No. #g.11020/01/2070 0 dt. 04.01.2010
2. The Commissioner Sf RailwaySafety, Western Circle, 2™ Floor, Churchgate Stn. BMig.c:Annexe, M.Ks Road, Mumbai-400 020, w.r.t his letter No. 221/544 dated’31,12.3009.
| cr-edyta i ° for Secretary, Railway Board
OL
Te
SHES
- great Baca GOVERNMENT OF INDIA To
Qe dara MINISTRY OF RAILWAYS OF
(aad Bs RAILWAY BOARD )
No. 2007/CEDO/SD/0. New Delhi, dated 02.02.2010
The Executive Director (Track) RDSO,Manak Nagar Lucknow.
Sub: IR Schedule of Dimensions 1676 mm Gauge(BG) Revised ,2004
Ref: (i) Board’s letter of even No. dt. 13.01.09 , 19.03.09 & 08.09.09
(ii) RDSO letter No. CT/SD/Rev./BG/MG dt. 16. 11.2009
Vide letter referred at (ii) above Track Dte. of RDSO have informed that
the Signal Dte has examined the issue of infringements of signal foundation &
has opined that changes are not feasible due to various practical and
maintenance problems. It has also been informed that there is no standard
drawing issued by RDSO for foundation of signal post.
This issue was discussed in a meeting with Board(ME) and it was seen that
the infringements of signal foundation can be resolved with the finalisation of
standard drawing for foundation of signal post without infringing the dimensions
_ of IRSOD Revised,2004.
Kindly get the needful done at the earliest. A
a
coe _ ( T.Gupta )
4 oe Executive Director Civil Engg.(G Railway Board.
A are SIF aa
an GOVERNMENT OF INDIA
_ MINISTRY OF RAILWAYS | (RAILWAY BOARD)
- No. 2000/CEDO/ORI/38. New Delhi, dated 9q .01.2010
The Chief Commissioner of Railway Safety,
DRM NER Compound, Ashok Marg, = Lucknow-226001.
> Sub: Opening of new electrified Up B.G. line between Belapur
o and Panvel section of Mumbai division of Central Railway
” for public carriage of passengers.
~ Ref:(iJCCRS’s Letter No. R. 12021/1/2000-RS_ dated
. 19.07.2000
> (iijCRS’s (Central Circle) letter No. R.
° 12021/4/99/CC/123/H-115 dated 02.06.2000
2 With reference to your endorsement No. R. 12021/1/2000-RS dated
o 19.07.2000, the approval of Ministry of Railways is hereby communicated to
. the recommendation of Commissioner of Railway Safety, Central Circle,
“ Mumbai for opening of the above section for public carriage of passengers as
per his letter No. R. 12021/4/99/CC/123/H-115 dated 02.06.2000.
| (relyta) “ Co (_ Executive Director Civil Engg.(G)
Railway Board. ~
o No. 2000/CEDO/ORI/38. New Delhi, dated ey .01.2010
Copy forwarded for information to:
™ (i) The Commissioner of Railway Safety, Central Circle, 2"¢ Floor, Churchgate
_ Station Bldg. Annexe, Maharshi Karve Road, Mumbai-400020 w.r.t. his
~~ letter No. R. 12021/4/99/CC/123/H-115 dated 02.06.2000.
(ii/The Chief Administrative Officer (Const.), Central Railway, New
Administrative Building, Dadabhai Naoroji Road, Mumbai CST-400001.
“ (iii) The General Manager (Engg), Central Railway, Mumbai.
m~
~ ov :
( T.Gupta )
~ for Secretary, Railway Board.
oN
oR 36
gf 38 eo L
6/ F
ae
EE" | N\“BD GOVERNMENT OF INDIA
a MINISTRY OF RAILWAYS
(RAILWAY BOARD)
A No. 2004/CEDO/ORI/51. New Delhi, dated 25.01.2010
cr The Chief Commissioner of Railway Safety,
DRM NER Compound, Ashok Marg,
S Lucknow-226001. “A
Sub: Opening of new double line between Majerhat and New
- Alipore Calcutta stations on Sealdah -Budge section of
_ Sealdah Division of Eastern Railway for public carriage of
passengers.
~~
Ref:(iJCCRS’s Letter No. R. 12042/02/2004-RS_ dated
< 10.11.04
~ {iiJCRS’s (Eastern Circle) letter No. 608/I/ E/04/583/H
‘- dated 30.09.04
Pa
“ ‘With reference to your endorsement No. R. 12042/02/2004-RS dated
- 10.11.04, the approval of Ministry of Railways is hereby communicated to the
recommendation of Commissioner of Railway Safety, Eastern Circle, Kolkata for
_ opening of the above section for public carriage of passengers as per his letter
. No. 608/1/E/04/583/H dated 30.09.04.
T_
: hat -
~ ( T.Gupta }
. t///_-Executive Director Civil Engg.(G)
~ Railway Board.
* No. 2004/CEDO/ORI/51. New Delhi, dated ~9.01.2010
” Copy forwarded for information to:
: (i) The Commissioner of Railway Safety, Eastern Circle, 14, Strand Road, (12%
~ Floor), Kolkata-700001, w.r.t. his letter No. 608/1/E/04/583/H dated
os 30.09.04.
(ii) The Chief Administrative Officer (Const.), Eastern Railway, Kolkata.
~ (iii) The General Manager (Engg), Eastern Railway, Kolkata.
"
3x eer
SIF GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
' (RAILWAY BOARD)
No. 2004/CEDO/ORI/60. New Delhi, dated 25.01.2010
The Chief Commissioner of Railway Safety, DRM NER Compound, Ashok Marg, Lucknow-226001.
Sub: Opening of the down line between Kopai and Prantik stations on Sainthia-Bolpur-Khana Jn. Section in Howrah Division of Eastern Railway for the public carriage of passengers.
Ref:(iJCCRS’s Letter No. R. 12022/01/2004-RS dated 02.09.04
(iiJ)CRS’s (Eastern Circle) letter No. 6/1/2/8/04/121/H
dated 05.05.04
soees
With reference to your endorsement No. R. 12022/01/2004-RS dated 02.09.04, the approval of Ministry of Railways is hereby communicated to the recommendation of Commissioner of Railway Safety, Eastern Circle, Kolkata for
opening of the above section for public carriage of passengers as per his letter No. 6/1/Z/8/04/121/H dated 05.05.04.
Vo
J
( nalipte ) 7_-Executive Director Civil Engg.(G)
Railway Board.
No. 2004/CEDO/ORI/60. New Delhi, dated 23.01.2010
Copy forwarded for information to:
(i) The Commissioner of Railway Safety, Eastern Circle, 14, Strand Road, (12
Floor), Kolkata-700001, w.r.t. his letter No. 6/1/Z/8/04/121/H dated
05.05.04. (ii) The Chief Administrative Officer (Const.), Eastern Railway, Koikata.
(iii/The General Manager (Engg), Eastern Railway, Kolkata.
v 2a——
AME ( T.Gupta )
od aay Secretary, Railway Board.
Ve . ' . j FMS ore \
a)
ao
Y ot GOVERNMENT OF INDIA oS MINISTRY OF RAILWAY6 |
(RAILWAY BOARD) i No, 2009/CEDO/ORI/27. New Pelhi, dated 225,01.2010 The Chief Commissioner vf Railway Salcty, DRM NER Compound, Ashok Marg, | Lucknow-226001.
Sub: Opening of newly converted BG single line ‘after conversion from MG to BG between Farrukhabad and Kasganj Stations of Izzatnagar Division of N.E. Railway . for public carriage of passengers, ”
{ue
Ref:(i)CRS’s (North Eastern. Circle) letter |; No. (447/1/C/OPG/P.T,/1248 dated 30.11.07. 1
aeees
The approval of Ministry of Railways is hereby communicated té the recommendation of Commissioner of Railway Safety, North Eastern Circle, Lucknow for opening of the above section for public garriage of passengers as per his letter No, 447 /1/C/OPG/P.T./1248 dated 30.41.07.
4 . of ee
( T.Gupta ) 1 Executive Director Civil Engg.(G) (= _ Railway Board.
No. 2009/CEDO/ORI/27. | - New Delhi, dated 29.01.2010 Copy forwarded for information to: (} The Commissioner of Railway Safety, North Fagtern Circle, Hazratganj, Lucknow-226001, w.r.t. his letter No. 447 /1/C/OPG/P.T./1248 dated 30.11.07. (iiJThe Chief Administrative Officer (Const.), North , Eastern Railway, Goralchpur.
(ili)The General Manager (Engg), North Eastern Railway, Gorakhpur. |
ST NMATRT i : _— + toe
a) ee Metninizy Of Rallware ' TG pta ) |
for Secretary, Railway Board.
poy Board
my fae are a Enoleswre
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS "(RAILWAY BOARD)
No. 2001/CEDO/ORI/8. New Delhi, dated 24.01.20 10
The Chief Commissioner of Railway Safety, DRM NER Compound, Ashok Marg,
Lucknow-22600 1.
Sub: Opening of the new Up main line (Fly-over line) between
Khana and Jhapatar Dhal stations of Howrah division in
Khana-Sainthia section of Eastern Railway for the public
carriage of passengers.
Ref:(iJCCRS’s Letter No. R. 12012/08/2000-RS dated
29.12.2000 (iiJCRS’s (Eastern Circle) letter No. 6/1/Z-4/2000/368
dated 30.11.2000 saves
With reference to your endorsement No. R. 12012/08/2000-RS dated
29.12.2000, the approval of Ministry of Railways is hereby communicated to
the recommendation of Commissioner of Railway Safety, Eastern Circle,
Kolkata for opening of the above section for public carriage of passengers as
per his letter No. 6/1/Z-4/2000/368 dated 30.11.2000.
oe a
( T.Gupta }
oT <_seecutive Director Civil Engg.(G)
. Railway Board. |
No. 2001/CEDO/ORI/8. New Delhi, dated %q.01.2010
Copy forwarded for information to:
(i) The Commissioner of Railway Safety, astern Circle, 14, Strand Road, (12
Floor), Kolkata-700001, w.r.t. his letter No. 6/1/Z-4/2000/368 dated
30.11.2000. (ii) The Chief Administrative Officer (Const.), Eastern Railway, Kolkata.
(iii) The General Manager (Engg), Eastern Railway, Kolkata.
Shotay on ( T.Gupta )
. i as for Secretary, Railway Board.
= By _—
an TAS GIF tra oe ° We . 4
ae GOVERNMENT OF INDIA _ MINISTRY OF RAILWAYS
(RAILWAY BOARD) A“
A No. 2009/CEDO/ORI/28. New Delhi, dated 99.01.2010
~ The Chief Commissioner of Railway Safety,
DRM NER Compound, Ashok Marg,
” Lucknow-226001.
” Sub: Opening of new BG Dn main line (non-electrified)
a between Bakudih station (Km. 184.79 from Khana Jn.)
and Barharwa station (Km. 177.04 from Khana Jn.) in
~ Malda Division of Eastern Railway for public carriage of
A goods and passenger traffic.
o~ Ref: (iJCRS’s (Eastern Circle) letter No. 6/1/Z-13/08-
~ 09/1270/H dated 30.03.09
. The approval of Ministry of Railways is hereby communicated to the
“ recommendation of Commissioner of Railway Safety, Eastern Circle, Kolkata for
- opening of the above section for public carriage of passengers as per his letter
No. 6/1/Z-13/08-09/1270/H dated 30.03.09.
_
dan 2 ( T.Gupta )
o Executive Director Civil Engg.(G)
. Railway Board.
os No. 2009/CEDO/ORI/28. New Delhi, dated 99.01.2010
“ Copy forwarded for information to:
” (i) The Commissioner of Railway Safety, Eastern Circle, 14, Strand Road, (12%
~ Floor), Kolkata-700001, w.r.t. his letter No. 6/1/Z-13/08-09/1270/H dated
30.03.09. a (ii) The Chief Administrative Officer (Const.), Eastern Railway, Kolkata.
A (iii)The General Manager (Engg), Eastern Railway, Kolkata.
-—~ gv 2
”™ . ( T.Gupta )
~ for Secretary, Railway Board.
cs
2-- gIzd aided GOVERNMENT OF INDIA Ze 2a sareta MINISTRY OF RAILWAYS Gl
(Jaa ABS RAILWAY BOARD ) —
No. 2010/CEDO/SR/05 New Delhi, dated 28.01.2010
The General Manager(Engg), North Eastern Railway, Gorakhpur.
Sub: Running of “WDP-4B” class of locomotives with a maximum speed of 105kmph over North Eastern Railway.
Ref: Your office letter No. W/340/BG/WDP4B/4A,dt: 11/11/2009
In reference to above letter, the sanction of the Ministry of Railways, Railway Board is hereby communicated for Running of “WDP-4B” class of locomotives with a maximum speed of 105kmph over North Eastern Railway subject to terms and conditions as given in RDSO’s Final Speed Certificate and North Eastern Railway's Joint Safety Certificate, Track
’ Certificate and other Certificates accompanying above referred letter.
Crebpta Executive Director Civil Engg.(G)
Railway Board.
No. 2010/CEDO/SR/05 New Delhi, dated 28.01.2010
Copy forwarded for information to: 1. CCRS, Compound of DRM/NER, Ashok Marg, Lucknow —226001 w.r.t. his
endorsement No. @e.13011/02/2009- aofeo dt. 11/01/2010 2. The Commissioner of Railway Safety, N.E. Circle, Hazratganj, Lucknow- 226001
w.r.t. his letter No.3499AVDP4B/NE/SANC/SANC-02/1128 dated 22-12-2009 3. The Executive Director Standards (Motive Power), RDSO, Lucknow, w.r.t. his letter
No. SD.WDP4B.11, dt. 01.05.2008.
Co for Secretary, Railway Board.
) >
J > DD
2D )
) XJ
3} Jd
7D)
> ‘dy
FD OD
> d
The Chief Engineer/Con-6, N.F. Railway, Maligaon, Guwahati-11.
Sub: - Opening of Katihar-Mukuria (34.61 Km) on conversion from MG to BG a part of Katihar-Jogbani including Katihar- Barsoi and Barsoi-Radhikapur (195.48, Km) gauge conversion project in Katihar Division of NF Railway for public carriage of passenger. \ 4
a \ Ref: Your letter No. W/260/CON/KIR-BOE dated 19,02,.2009.
REE
With reference to your letter referred above, it is mentioned that CRS Inspection Report dated 30.04.2008 and authorization letter have not been received in Board office.
-You are requested to send copies of CRS Inspection Report dated 30.04.2008 alongwith authorization letter to this office for communicating the approval of the opening of the section by the Board.
J m8 §
( nests ) Exec, Director, Civil Engineering (G)
(Railway Board).
te aaa Ban
—O ae
— - G / fe Hee rs oy GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS (RAILWAY BOARD)
No.2009/CEDO/ORI/4 New Delhi, dated 9,,.01.2010
gid ‘atacnray GOVERNMENT OF INDIA Zt Yat gale MINISTRY OF RAILWAYS GIF _i
(Yaak BS RAILWAY BOARD )
No.2010/CEDO/SR/01 ' New Delhi, dated 18.01.2010.
The General Manager(Engg), Western Railway,
Churchgate, Mumbai-20.
Sub:Running of BG ICF AC/DC EMU Motor and Trailer Coaches fitted
with modified ICF bogies having “ Hydro” springs with internal
damping at primary stage and pneumatic suspension at the
secondary stage up to a maximum speed of 100 kmph on CCG-VR
suburban section of Western Railway .
Ref: Your office letter No. W.636/15/5/20(W3), dated 03.12.2009.
) )
J
In reference to above letter, the sanction of the Ministry of
Railways, Railway Board is hereby communicated for Running of BG ICF
AC/DC EMU Motor and Trailer Coaches fitted with modified ICF
bogies having “ Hydro” springs with internal damping at primary
stage and pneumatic suspension at the secondary stage up toa
maximum speed of 100 kmph on CCG-VR suburban section of
Western Railway subject to terms and conditions as given in RDSO's
Final Speed Certificate and Western Railway’s Joint Safety Certificate,
Track Certificate and other Certificates accompanying above referred
letter.
(1 Gta Executive Director Civil Engg.(G)
Railway Board.
J22X2IXAD
DF DDD
YD
No.2010/CEDO/SR/01 New Delhi, dated 18.01.2010
Copy forwarded for information to :-
i. The Chief Commissioner of Railway Safety, compound of DRM/NER,
Ashok Marg, Lucknow - 226001 w.r.t. his endorsement
No. #4,13011/55/2009- aoftto/O7 dt. 31.12.2009
2. The Commissioner of Railway Safety, Western Circle, 2°¢ Floor,
Churchgate Stn. Bldg. Annexe, M.K. Road, Mumbai-400 020, w.r.t
his letter No. 12-5/184/127 dated 15.12.2009.
3. The Sr. Ex. Director Stanandards (Motive Power), RDSO, Manak
Nagar,Lucknow-226011, w.r.t. his letter No. SV.ICF dt.01/03-09-09
ate J 2
ars (T.Gupta)
vo or Secretary, Railway Board.
De
rI III
DID Y
ofS? => {
G/F Siqd altace GOVERNMENT OF INDIA Ra dialer MINISTRY OF RAILWAYS (aa BE RAILWAY BOARD )
No.2010/CEDO/SR/02 New Delhi, dated 18.01.2010.
The General Manager(Engg), Western Railway, Churchgate, Mumbai-20.
Sub:Running of BG ICF AC/DC EMU Motor and Trailer Coaches fitted with modified ICF bogies having “ Conical” springs with external dampers at primary stage and pneumatic suspension at the secondary stage up to a maximum speed of 100 kmph on CCG-VR suburban section of Western Railway
Ref: Your office letter No. W.636/15/5/19(W3), dated 04.12.2009.
In reference to above letter, the sanction of the Ministry of Railways, Railway Board is hereby communicated for Running of BG ICF AC/DC EMU Motor and Trailer Coaches fitted with modified ICF bogies having “ Conical” springs with external dampers at primary stage and pneumatic suspension at the secondary stage up to a maximum speed of 100 kmph on CCG-VR suburban section of Western Railway subject to terms and conditions as given in RDSO’s Final Speed Certificate and Western Railway’s Joint Safety Certificate, Track Certificate and other Certificates accompanying above referred letter.
3
( T.Gupta ) Executive Director Civil Engg.(G)
Railway Board.
No.2010/CEDO/SR/02 New Delhi, dated 18.01.2010 Copy forwarded for information to :-
1. The Chief Commissioner of Railway Safety, compound of ORM/NER, Ashok Marg, Lucknow - 226001 wa.r.t. his endorsement No. Fa, 13011/56/2009- aofto dt. 31.12.2009
2. The Commissioner of Railway Safety, Western Circle, 2" Floor, Churchgate Stn. Bldg. Annexe, M.K. Road, Mumbai-400 020, w.r.t his letter No. 12-5/184/128 dated 15.12.2009.
Pace Stl DLink: Director Stanandards (Motive Power), RDSO, Manak : Nae Neo -226011, w.r.t. his letter No. SV.ICF dt.01/03-09-09
J 2— OFC (T.Gupta)
for Secretary, Railway Board.
<a xe 7 t % eee Sad “Aaecra GOVERNMENT OF INDIA GfF
| aA et darcy MINISTRY OF RAILWAYS “ (Waa Bs RAILWAY BOARD )
7 No. 2010/CEDO/SR/03 New Delhi, dated 18.01.2010 os |
The General Manager(Engg), re Northern Railway,
Baroda House, New Delhi. ~
rn Sub:Provisional running of Bogie Open wagon type - BOXNLWM-1 having maximum axle load of 22.32t _ (CC+6+2t) over various sections of Northern Railway at ~ a maximum permissible speed of 60 kmph (loaded) & 65
kmph(empty). _ Ref: Your office letter No. 519-W/958,dt: 24/11/2009 a
ra In reference to above ietter, the sanction of the Ministry of Railways, Railway Board is hereby communicated for Provisional running
o~ of Bogie Open wagon type BOXNLWM-1 having maximum axle load A of 22.32t(CC+6+2t) over various sections of Northern Railway at a
maximum permissible speed of 60 kmph (loaded) & 65 kmph o (empty) subject to terms and conditions as given in RDSO’s Provisional
Speed Certificate and Northern Railway’s Joint Safety Certificate, Track o Certificate and other Certificates accompanying above referred letter.
- Crdupta Executive Director Civil Engg.(G)
~ Railway Board.
No. 2010/CEDO/SR/03 New Delhi, dated 18.01.2010 ~ Copy forwarded for information to:
1. CCRS, Compound of DRM/NER, Ashok Marg, Lucknow -226001 w.r.t.
” his endorsement No. 72,13011/52/2009- awfto dt. 12.12.2009 ~ 2. The CRS/Northern Circle, CRIS complex, Chanakyapuri, N.Delhi-21 w.r.t. his
letter No. 2009/Q-14(17)/NC/S06-908 dt. 10.12.2009 ” 3. The Executive Director Standards (Motive Power), RDSO, Lucknow, w.r.t. his
a letter No. MW.SPD/BG/BOXNLWM1/22.32t/PROV, dt. 13.08.2009.
os J a2
~ (T.Gupta) - for Secretary, Railway Board. of
~
“~
Ye GOVERNMENT OF INDIA
a we MINISTRY OF RAILWAYS ~ (RAILWAY BOARD)
oN No.2009/CEDO/ORI/15 New Delhi, dated a .01.2010
” The Chief Administrative Officer (Const. ), rm Southern Railway,
Chennai.
Sub: -Opening of Railways- Dindigul-Madurai doubling project- Opening of the newly laid double line form Kodaikanal Road
~ (incl.) to Madurai (excl.) stations i.e. Down line from Km. 454.225 to Km. 493.750 in Madurai Division of Southern
”~ Railway for public carriage of passengers.
Pa
Ref: i) CRS/Southern /Bangalore’s letter No. R. mn 12027/07 /2008-SR/577 dated 20.07.09.
“ feeke
_~ The above section was inspected by CRS/Southern Circle/Bangalore on 06.07.2009 & 07.07.2009 and opening of the section was authorized by him
o vide his letter No. R. 12027/07/2008-SR dated 16.07.2009 with certain observations. The inspection report has been sent to this office with a copy to
“ you. ~
You are requested take necessary action to comply with the various ~ observations made in his above letter for opening the section.
on
The action taken on different items recorded in the juxta position to the os above document may be furnished to CRS/Southern Circle, endorsing a copy
to this office for communicating the approval of the opening of the section by the Board,
(T. upta ).
, : ‘ . ¢g
a ( rdapta ) For Secretary, Railway Board
y)
> Y
Ded FD
”D Y'?
JF 9
) so
er)
oo
ww
co
a oo \ 7 Oe .
note ZF
Ye Sf
Ser GOVERNMENT OF INDIA MINISTRY OF RAILWAYS
(RAILWAY BOARD)
No.2009/CEDO/ORI/10 | New Delhi, dated 15.01.2010
The Chief Administrative Officer (Const.), Southern Railway,
Chennai.
Sub: -Commissioning of 25 KV single phase AC 50 cycles
electric traction on Thrisur (excl.)- Guruvayur (incl) BG line
section in Tiruvanathapuram Division of Southern Railway for public carriage of passengers.
Ref: i) CRS/Southern /Bangalore’s letter No. R. 12047 /1/2009-SR/1998 dated 06.03.09.
RRRE
The above section was inspected by CRS/Southern Circle/Bangalore on
25.02.09 and opening of the section was authorized by him vide his letter No.
R. 12047/1/2009-SR dated 06.03.2009 with certain observations. The inspection report has been sent to this office with a copy to you.
. You are requested take necessary action to comply with the various
observations made in his above letter for opening the section.
The action taken on different items recorded in the juxta position to the
above document may be furnished to CRS/Southern Circle, endorsing a copy
to this office for communicating the approval of the opening of the section by
the Board.
(T. Gupta) 2 Exec: Director, Civil Engineering (G)
(Railway Board).
No.2009/CEDO/ORI/40 "
Copy forwarded for information to ‘the Commisgicner “of Railway Safety,
Southern’ Circle, No. 7; Seshadri. ‘Road, Gandhinagar, Bangalore- -560009 with
Li
yoy)
Dd DD
DVD
DD
DD
YTD
DD
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS
(RAILWAY BOARD)
No.2009/CEDO/ORI/11 New Delhi, dated } §.01.2010
The Chief Engineer/Const. /East, South Western Railway,
Bangalore.
Sub: - Opening of new BG double line between Nidavanda (Km.
47/500) and Tumkur (Km. 70/100) in Bangalore division of
South Western Railway for public carriage of passengers.
Ref: Your letter No. W.347/YPR-TK/DL/BNC dated 28.11.2009, KRRE
With reference to your letter referred above, it is mentioned that CRS
Inspection Report dated 13.04.2009 and authorization letter have not been™~
received in Board office.
You are requested to send copies of CRS Inspection Report dated
13.04.2009 alongwith authorization letter to this office for communicating the
approval of the opening of the section by the Board.
od
( T.Gpupta ) Exec. Director, Civil Engineering (G)
(Railway Board).
cy
3 > YY
DR YD
d ?
G/Fie
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS
(RAILWAY BOARD)
No.2009/CEDO/ORI/8 New Delhi, dated [x .01.2010
The Chief Engineer/Const./East, South Western Railway,
Bangalore.
Sub: - Opening of Railways- Hospet-Kariganuru section- Guntakal-Hospet- Doubling by gauge conversion from MG to BG in Hubli division of South Western Railway for public carriage of passengers.
Ref: Your letter No. W.347/DL/BNC/BAY-TNGL-HT/VoL11
dated 02.03.2009. eK
With reference to your letter referred above, it is mentioned that CRS
Inspection Report dated 06/07.10.2008 and authorization letter have not been
received in Board office.
You are requested to send copies of CRS Inspection Report dated
06/07.10.2008 alongwith authorization letter to this office for communicating
the approval of the opening of the section by the Board.
J a
( T.Gupta ) Exec. Director, Civil Engineering (G)
(Railway Board).
SINY
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS (RAILWAY BOARD)
New Delhi, dated /$.01.2010 No.2009/CEDO/ORI/9
The Chief Engineer /Const./East,
South Western Railway,
Bangalore.
With reference to you
Inspection Report dated 14.
Sub: - Opening of Railways- Kariganuru-Bayaluvoddigeri
section-Guntakal-Hospet- Doubling by gauge conversion from
MG to BG in Hubli division of South Western Railway for public
carriage of passengers.
o. W.347/DL/BNC/ BAY-TNGL-HPT/Vol.IIT
Ref: Your letter N
dated 02.03.2009. RRRK
it is mentioned that CRS r letter referred above,
ation letter have not been 03.2008 and authoriz
received in Board office.
You
14.03.2008 alongwith au
approval of the opening of
f CRS Inspection Report dated
are requested to send copies 0 r communicating the
thorization letter to this office fo
the section by the Board.
7
( T.Gupta )
Exec. Director, Civil Engineering (G)
(Railway Board).
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS
(RAILWAY BOARD]
No.2009/CEDO/ORI/6 New Delhi, dated ly .01.2010
The Chief Engineer/Con It Eastern Railway, Kolkata.
nner
Sub: - Opening of new Dn main line BG section after doubling between Uren and Kajra station of Malda Division of Eastern Railway for public carriage of passenger traffic.
Ref: Your letter No. CAO/CON/W/2032/CRS dated 09.04.2009. Kk ete . t
With reference to your letter referred above, it is mentioned that CRS Inspection Report datect 20.08.2008 and authorization letter have not been received in Board office.
You are requested to send copies of CRS Inspection Report dated 20.08.2008 alongwith authorization ‘eiter io this office for communicating the approval of the opening of the section by the Board. |
J [ ;
( T-Gupta ) t ‘Exec. Director, Civil Engineering (G) U~ (Railway Board).
i
4 i i
j +
: ! 1 1
iy
2 .d ad
PoP.
DIDI
a
ae,
a)
5 7)
;
pop
POD
Dad
aD
dd
) G/T
of
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
(RAILWAY BOARD)
No.2009/CEDO/ORI/12 New Delhi, dated ih 01.2010
The Chief Engineer/Con I,
Eastern Railway,
Kolkata.
Sub: - Opening of newly constructed BG Dn line (electrified) between Baruipur Jn. station (Km. 24.740) and Dhapdhapi station (Km. 31.330) as part of doubling project on Sealdah division of Eastern Railway for public carriage of goods and passenger traffic.
Ref: Your letter No. CAO/CON/W/1948/CRS dated 08,04. 2009, week
With reference to your letter referred above, it is mentioned that CRS Inspection Report dated 27.10.2008 and authorization letter have not been received in Board office.
You are requested to send copies of CRS Inspection Report dated 27.10.2008 alongwith authorization letter to this office for communicating the approval of the opening of the section by the Board.
. ( T. riley } | Exec. Director, Civil Engineering (Gy
- \/ (Railway Board).
oy eee ares ee
a“ a at
eae FE™
Trea 2
a ~\
a ,
on
os
‘)
dey
AD DP DD
DD DED
Yop
pL
SD
Sy jad
i> 2
Ly
PP
OD
OD
OD yaad
)
oh
1
re
No.2007/CEDO/ORI/29
The Chief Administrative Officer/Con.,
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS
(RAILWAY BOARD)
New Delhi, dated [4 .01.2010 . t i | i { ' :
Eastern Railway, Kolkata.
Sub:
Rel:
Opening of newly constructed BG line with conversion of section into orthodox doubling including introduction of 25 KV AC electric traction between Diara (Km 5.440) |- ‘Singur (Km 11.180) stations as Up line, a part of Sheoraphulli Jn- Nalikul doubling of Howrah division, Eastern Railway for public carriage of passengers.
Your letter No, CAO/CON/W/1944/CRS dated 04.06.09 and No,CAO/CON/W/CRS/ Misc dated 04.01.2010.
aeAE
As already advised vide Board’s letter of even number dated 18.06.2009 {copy enclosed), compliance for observations given in the ere Circle inspection report dated 31.10.2006 for the item numb cred as 5.2, 10.2.1 bs 11.7.8 is not satisfactory. {
i
observations.
| You are requidsted to take necessary action fo ‘comply with spoke
| .
The action taken on different item recorded in juxtaposition to the above para’s may also be furnished to CRS/Eastern Circle endorsing a copy to this office.
wale f\« cote.
t ' t i i Il
( T.Gupta ) d Exec.Director, Civil Engineering (G)
{Railway Board). :
~ 4,
|
oa
ibaa
o>,
a)
od YD
TD
3 1}
OD
f
20d
y DO
o od wd. cael moe
.No.2008/CEDO/ORI/5
‘The Chief Administrative Officer/Cont., ‘Eastern Railway, Kolkata.
With reference! to AM/CE’s D.O. letters mentioned above to GM/ aster ‘n | Railway, it is brought out that 38 cases are still pending with your Railways (cory enclosed). | :
| You are advised to furnish the compliance report to the observations’ lof iCRS to Board office! with a copy to CRS and also give the reasons for jot ‘sending the compliance reports to Board office which has delayed ‘the finalization of the cases.
DA: As above. . Exec. Director, Civil Engineering (G)
Copy to: Principal Chief Engineer/Eastern Railway, |!
eyes uy iit "Dare of laa oss. ©
REMINDER URGENT
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS .
(RAILWAY BOARD) : {
[
New Delhi, dated |X’. 06. .2099
| |
Sub: - Compliances of CRS Inspection notes for opening of new lines, doublings and gauge conversions for passengers traffic.,
Ref: AM/CE D.O. letter of even number dated 12.09.2008 and
30.01. 2009 addressed to GiM/Eastern Railway. deck
i ! We
+
t
. 1 aa eee
( T.Gupta ) mes Board}.
olkata.
S
“dS
YD
E>
Y ?
GOVERNMENT OF INDIA ; MINISTRY OF RAILWAYS
(RAILWAY BOARD)
No.2000/CEDO/ORI/13 New Delhi, dated 4 .01.2010
_The Chief Engineer/CON/I,
Eastern Railway, : Kolkata. 3
Sub: - Opening of new B.G. electrified Dn line from Akra (Kim 19.42) to Nangi (Km 22.39) station on Sealdah- Budge Budge section of Sealdah division of Eastern Railway for Public Carriage of Passengers.
Ref: Your office letter No, CE/Con/W/1803/CRS dated 17.10.2000 and 09.07.08 and No. CAO/CON/W/CRS/Misc dated 04.10.2010. ;
ok eee
As already advised vide Board’s letter of even number dated .23.07.2008(copy enclosed), compliance for observations given in the _CRS/Eastern Circle inspection Note No. 608/1/2000/861/H dated 15.03.2090 -for the items numbered as 7.3, 8.3, 12.2, 12.3 and 12. 41 are not satisfactory.
You are requested to take necessary action jo comply with aboys e i ‘observations. } | ,
{ ie.
The action taken on different item recorded in jugtaposition to the abo “para’s mi vy also be furnished to CRS/ astern Circle ¢ hdor sing a copy to this office.
am i
} i
ivf | ( T.Gupta )
DA: As above. Exec.Director, Civil Engineering (G) (Railway Board).
4
ae
ae
SEIS”
er)
i)
. 4
¢
No.2000/CEDO/ORI/ 13
cA, ee tadetnadiarae waur
Yo
a
oN pe
on GOVERNMENT OF INDIA
‘ MINISTRY OF RAILWAYS
(RAILWAY BOARD)
Yhe Chief Engineer/CON/I,
Eastern Railway,
Kolkata.
Sub: - Opening of new B.G. electrified Dn lin
19.42) to Nangi (Km 22.
Budge section of Sealdah division 0
for Public Carriage of Passengers.
Ref: Your office letter
17.10.2000 and 09.07.08. KKK
With reference to your letter dated 17.10.2000
compliance for observations giv
No. 608/1/2000/861/H dated 15.03.2000 for the items num
12.2, 12.3 and 12.4 are not satisfactory.
_ You are requested to take necessary action to comp!
observations.
The action taken on different item recorded in juxta
para’s may also be furnished t
office.
( T.Gupta }
Exec.Director, Civi
_ (Railway Board).
(ClO. oe
rf. \ 2s My
To oem ctang < npreemnns as a mene a +
39) station on Sealdah-
£ Eastern Railway .
o CRS/ Eastern Circle endorsing a copy
Sseneianienniitem aia
New Delhi, dated P% 07.2008
e from Akra (Km Budge
No. CE/Con/W/1803/CRS dated
referred above,
en in the CRS/Eastern Circle inspection Note
bered as 7.3, 8.3,
y with above
position to the above to this
1 Engineering (G)
Peer rather atmeminons
er
Te we
r —
GOVERNMENT OF INDIA a MINISTRY OF RAILWAYS
~ (RAILWAY BOARD)
~ No. 2001/CEDO/ORI/11. New Delhi, dated > .01.2010
“ The Chief Commissioner of Railway Safety, _ DRM NER Compound, Ashok Marg, .. Lucknow-226001.
: Sub: Opening of newly constructed Dn 1500 V DC electrified ~ BG line between Bhivandi Road and Kaman Road stations | om on Mumbai division of Central Railway for public carriage ~ of passengers.
~ Ref:(i}CCRS’s Letter No. R. 12011/03/2000-RS dated ” 29.12.2000 ~ (ii)CRS’s (Central Circle) letter No, R, 12011/1/2000-
CC/125/H/209 dated 16.10.2000 ON eee
~ With reference to your endorsement R. 12011/03/2000-RS dated 29,12.2000, the approval of Ministry of Railways is hereby communicated to the recommendation of Commissioner of Railway Safety, Central Circle,
_ Mumbai for opening of the above section for public carriage of passengers as per his letter No. R. 12011/1/2000-CC/125/H/209 dated 16.10.2000.
_
. ( T.Gupta ) “ Executive Director Civil Engg.(G) ~ Y Railway Board.
o No. 2001/CEDO/ORI/11. New Delhi, dated ->.01.2010
Copy forwarded for information to:
— (i) The Commissioner of Railway Safety, Central Circle, 2"4 Floor, Churchgate ~ Stn. Bldg. Annexe, M.K. Road, Mumbai-400020, w.r.t. his letter No. R.
12011/1/2000-CC/125/H/209 dated 16.10.2000. (ii) The Chief Administrative Officer (Const.}, Central Railway, Mumbai.
~ (iii)/The General Manager (Engg), Central Railway, Mumbai. -
~ lot 2
( T.Gupta )
- for Secretary, Railway Board.
-_
Dae
SA tH grad araniry GOVERNMENT OF INDIA ot REP Ze! Yer giaryal MINISTRY OF RAILWAYS Sine ae |"
6 (aa Bs RAILWAY BOARD )
. No. 2007/CEDO/SD/0. New Delhi, dated 06.01.2010
~ The Executive Director (Track)
. RDSO,Manak Nagar
~ Lucknow.
o _ Sub: IR Schedule of Dimensions 1676 mm Gauge(BG) Revised,2004
~ Ref: (i) Board’s letter of even No. dt. 16/07/08 , 17.10.08 & 10.09.09
. {ii} RDSO letter No. CT/SD/Rev./BG/MG dt. 10/16-11-09
Vide letter referred at (ii) above , RDSO has sent further modification in:
~ ACS-4 regarding power line crossings & for well founded posts, has proposed
dispensation by Electrical Inspector to be incorporated in IRSOD subject to
_ - minimum distance of 2360mm from centre of track.
. This issue has been examined and not found acceptable in view of
~~ stipulation of earlier IRSOD of 1973 where a clear distance was only prescribed
mn for rigid and well founded post carrying electrical conductors & no dispensation
~ by Electrical Inspector was required.
Accordingly RDSO may examine the issue keeping the same stipulation as
- per IRDOD 1973 except increasing the horizontal distance to 2360mm instead
“ of 2135mm & send the final draft for consideration & approval of Board at the
r earliest.
spray a ~ ( T.Gupta )
o @ Ye Executive Director Civil Engg.(G)
~ Railway Board.
~ Ta Wess Oe
”N bainintey ae yeaye
“~ iets _ a WM a
-
”
Yo / File on nh
ry o ~ on 6) Wad atyaia GOVERNMENT OF INDIA
ye at ‘Feat sarerar MINISTRY OF RAILWAYS i \ \y
- (ara Ws RAILWAY BOARD )
~ No. 2009/CEDO/SR/57 New Delhi, dated 06.01.2010
- The General Manager(Engg), A Central Railway,
- Mumbai C.S.T.
. ' Sub:Operation of Mobile Bridge inspection Unit (MBiU) having
> maximum axle load of 20.32t up to a maximum speed of 50kmph.on
~ all BG section of Central Railway.
~ Ref: Your office letter No. W.681/136/BR/MBIU,dt: 20/10/09.
In reference to above letter, the sanction of the Ministry of Railways,
~ Railway Board is hereby communicated for Running of Mobile Bridge inspection
a Unit (MBIU) having maximum axle load of 20.32t up to a maximum speed of 50kmph
. on all BG section of Central Rallway subject to terms and conditions as given in
~ RDSO’s provisional speed certificate and Central Railway’s Joint Safety
Certificate, Track Certificate and other Certificates accompanying the above
~ referred letter.
- | ( T.ebpta) Executive Director Civil Engg.(G)
- Railway Board. we
No. 2009/CEDO/SR/57 New Delhi, dated 06.01.2010
rc Copy forwarded for information to :~-
~ 1. The Chief Commissioner of Railway Safety, compound of DRM/NER,
° Ashok Marg, Lucknow - 226001 w.r.t. his endorsement
No. @a,13011/46/2009- aoftro/51 dt. 01.12.2009
™
2. The Commissioner of Railway Safety,'‘Central Circle, 2™ Floor,
™ Churchgate Stn. Bldg. Annexe, M.K. Road, Mumbai-400 020, w.r.t his
_ letter no. C-11( )2009-541 dated 22.10.09/13.11.09.
- 3. The Sr. Ex. Director Stanandards (Motive Power), RDSO, Manak
~ Nagar,Lucknow-226011, wrt. his letter No. MC/MBIV/SP
~ dated.09.09.2009 .
~ 2 * “(T.Gupta)
o for Secretary, Railway Board.
“ ~ i
Povne
tame
fee abe
)
wa-
ae
+a
a — je — Id Aaa GOVERNMENT OF INDIA mh rv, & at aisictal MINISTRY OF RAILWAYS ee A (3a BMS RAILWAY BOARD )
~ No. 2009/CEDO/SR/56 New Delhi, dated 05.01.2010 ~
The General Manager(Engg), - Central Railway, ~ Mumbai C.S.T,
nn. Sub: Running of Broad Gauge Bogie Covered Cement wagon type “BCCW” having maximum axle load of 21.82t (CC+6t) up to a _ maximum speed of 65 kimph in both empty and loaded condition between Wadi to BCCI siding Kalamboli via KJT-KYN & KJT-PNVL
° BG section of Central Railway.
Ref: Your office letter No. W/681/Y.113/BR/I,Dt: 12.06.2009. “oN
sone
mN "In reference to above letter, the sanction of the Ministry of Railways, ~ Railway Board is hereby communicated for for Running of Broad Gauge Bogie ~ Covered Cement wagon type “BCCW” having maximum axle load of 21.82t (CC+6t) - up to a maximum speed of 65 kmph in both empty and loaded condition between Wadi to BCCI siding Kalamboli via KJT-KYN & KJT-PNVL BG section of Central “* Railway subject to terms and conditions as given in RDSO’'s provisional speed ~ certificate and Central Railway's Joint Safety Certificate, Track Certificate - and other Certificates accompanying the above referred letter.
oft an ma (1.dupte ) r Executive Director Civil Engg.(G) Railway Board.
A No. 2009/CEDO/SR/56 New Delhi, dated 05.01.2010
> _ Copy forwarded for information to :- _ 1. The Chief Commissioner of Railway Safety, compound of DRM/NER, Me Ashok Marg, Lucknow - 226001 w.r.t. his endorsement a No. @q,13011/47/2009- aofto/56 dt. 01.12.2009
_ 2. The Commissioner of Railway Safety, Central Circle, 2" Floor, ° Churchgate Stn. Bldg. Annexe, M.K. Road, Mumbai-400 020, w.r.t his > letter no. C-11(225)2009-540 dated 05-13/1 1/2009.
3. The Sr. Ex. Director Stanandards (Motive Power), RDSO, Manak “ Nagar,Lucknow-226011, w.r.t. his letter No. MW/CS/Rajashree eee -20OQ —-- worn
~ u 2—_____ :
(T.Gupta) > for Secretary, Railway Board.
ds
ny
oa GIF _. tr 1 aad aac GOVERNMENT OF INDIA x 1 Bs At siaers MINISTRY OF RAILWAYS ae . (2eat BS RAILWAY BOARD ) “
:
” No. 2009/CEDO/SR/59 New Delhi, dated 05.01.2010
> The General Manager(Engg), ~ East Centra! Railway,
Hajipur.
A . Sub: Running of Broad Gauge Bogie open wagon type “BOXN” . (CC+8+2t)having maximum axle load of 22.82t up to a maximum speed of ™~ 60 kmph(loaded) and 80 Kmph (Empty) on specified routes of East Central Railway. So Ref: Your office letter No. W-8/552/CRS/CC+8+2t/BOXN,dt:07.10.09 f™
4 In reference to above letter addressed to CRS/ER/Kolkata, the ~ sanction of the Ministry of Railways, Railway Board is hereby communicated . for Running of Broad Gauge Bogie open wagon type “BOXN” (CC+8+2t)having nN maximum axle load of 22.82t up to a maximum speed of 60 kmph(loaded) and 80 Kmph (Empty) on specified routes of East Central Railway subject to terms and ~ conditions as given in RDSO's Final Speed Certificate and East Central ~ Railways Joint Safety Certificate, Track Certificate and other Certificates accompanying above referred letter.
” The sanction is further subjected to the recommendations/suggestions made by a CRS/Eastem Circle/ Kolkata and CCRS/LKO vide their letters No. 1020/ BOXN/09/ , 440/H dated 26.11.2009 & No @¥.13011/50/2009- aoftto/76 dt. 14.12.2009 respectively and with Board’s comments-as under:
“, “Operation of the wagon is being permitted initially for Two Years period or expiry of the currency of the pilot Project whichever is earlier, to be reviewed later after this ° Period or the expiry of the currency of Pilot project whichever is earlier.”
wo J
( redpea ) Executive Director Civil Engg.(G)
Railway Board. CEDO/SR/59 New Delhi, dated 05.01.2010 - Copy forwarded for information to: 72". L G@RS, Compound of DRM/NER, Ashok Marg, Lucknow -226001 w.r.t. his
ON a ‘“endorsement No. @ef,13011/50/2009- aoftto/76 dt. 14.12.2009 ~ P gt eae 2. The Commissioner of Railway Safety, Eastern Circle, 14,Strand Road, Son 12" Floor, Kolkata-700 001, w.r.t his letter No. 1020/ BOXN/09/ 440/H E87 dated 26.11.2009 . a 3. The Executive Director Standards (Motive Power), RDSO, Lucknow, w.r.t. his
letter No. MW/SPD/BG/BOXN/22.82t/OSC, dt. 19.01.2006. )
5 a
(T.Gupta) for Secretary, Railway Board
3 Y
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS
(RAILWAY BOARD)
No. 2005/CEDO/ORI/49. Oo New Delhi, dated 4; .01.2010 |
The Chief Commissioner of Railway Safety, DRM NER Compound, Ashok Marg, Lucknow-226001.
Sub: Opening of-Kolar-Bangarapet Section on completion of Gauge conversion project from NG to BG in Bangalore Division of South Western Railway for public carriage of passengers. ,
Ref:(i)CCRS’s Letter No. R. 12037/01/97-RS dated 10.12.97 {ii)CRS’s (Southern Circle) letter No. R. 12037/1/97 SR dated 09.09.97
With reference to your endorsement R. 12037/01/97-RS dated 10.12.97,
the approval of Ministry of Railways is hereby. communicated to the recommendation of Commissioner of Railway Safety, Southern Circle,
Bangalore for opening of the above section for public carriage of passengers as per his letter No. R.. 12037/1/97 SR dated 09.09.97.
( T.Gupta ) (Executive Director Civil Engg.(G)
Railway Board.
No. 2005/CEDO/ORI/49. New Delhi, dated b 01.2010
Copy forwarded for information to:
(i) The Commissioner of Railway Safety, Southern Circle, 7, Seshadri Road, Gandhinagar, Bangalore-560009, w.r.t. his letter No. R. 12037/1/97 SR
dated 09.09.97. (ii) The Chief Administrative Officer (Const.), SW Railway, Bangalore. (iii)The General Manager (Engg), SW Railway, Hubli.
_acemmmil
ey Seas | A { aise of Ba wee" a
| Pee yy ( T.Gupta )
t ou ad
) &: ‘ for Secretary, Railway Board.
os
yo a
\ wy GOVERNMENT OF INDIA MINISTRY OF RAILWAYS
(RAILWAY BOARD)
New Delhi, dated 4-.01.2010
No. 2007/CEDO/ORI/9.
The Chief Commissioner of Railway Safety, DRM NER Compound, Ashok Marg, Lucknow-226001.
Sub: Opening. of-the--newly- converted double line (Up line)
from Bayaluvoddigeri (excl) to Toranagaliu (excl) station
in Hubli division of South Western Railway from Km
161/5-6 (Km 96.676) to Km 175/5-6 (Km 82.696) for
public carriage of passenger.
Ref:{i)CCRS’s Letter No. R. 12037/05/2006-TW dated
22.02.07 / (iiJCRS’s (Southern Circle) letter No. R. 12037/7/2006 SWR/2380-91 dated 11.01.07
With reference to your endorsement R. 12037/05/2006-TW dated
22.02.07, the approval of Ministry of Railways is hereby communicated to the
recommendation of Commissioner of Railway Safety, Southern Circle,
Bangalore for opening of the above section for public carriage of passengers as
per his letter No. R. 12037/7/2006 SWR/2380-91 dated 11.01.07.
J VO
( T.Gupta )
Executive Director Civil Engg.(G)
Railway Board.
No. 2007/CEDO/ORI/9. New Delhi, dated .01.2010
Copy forwarded for information to:
(i) The Commissioner of Railway Safety, Southern Circle, 7, Seshadri Road,
Gandhinagar, Bangalore-560009, w.r.t. his letter No. R. 12037 /7 /2006
SWR/2380-91 dated 11.01.07. (ii) The Chief Administrative Officer (Const.), SW Railway, Bangalore.
{iii/The General Manager (Engg), SW Railway, Hubli.
ray ( T.Gupta )
for Secretary, Railway Board.
GFE,
* ars gad ata GOVERNMENT OF INDIA
a darera MINISTRY OF RAILWAYS
(yar GS RAILWAY BOARD ) A
New Delhi, dated pach2010
_ No. 2009/CEDO/SD/20. .
=~
~ The General Manager(Engg),
Oo South Central Railway,
~ Secunderabad-500 071.
‘Sub:Secunderabad Division- Lingampalli-Vikarabad Railway —
“ -..-Blectrification--~-condonation of infringement to
~ IR(BG)SOD Revised,2004 due to lesser horizontal
; - clearances of 02 overhead 33 KV power line crossings.
~ Ref: CEE/SCR office letter No. G/E.CN/61/11 dt.16.11.09
on 7 oor
” With reference to CEE/SCR letter referred above, sent through the
A Chief Commissioner of Railway Safety, Lucknow, the sanction of Ministry of
. Railways, Railway Board is here by communicated for condonation of
_ infringement to “IR(BG)SOD.. Revised,2004 due to lesser horizontal
_ clearances of 02 overhead 33.KV power line crossings in connection with
- Lingampalli-Vikarabad Railway Electrification of Secunderabad Division in
~ South Central Railway. as shown in Form-XVII and drawings enclosed with
above referred application . ™~™
, ) a
no
- ( T.Gupta )
nn Executive Director Civil Engg.(G)
Railway Board.
~ - No. 2009/CEDO/SD/20. f te Delhi, dated 04.01.2010
~ Copy forwarded for information to:-
1. The CCRS, Compound of DRM/NER, Ashok Marg, Lucknow —226001 wart. his
~ endorsement No.wa, 11018/09/2009- aoftro dated 17.12.2009
a 2. The C.R.S./South Central Circle, Sarojini Devi Road,
| Secunderabad-500 071 w.xn.t. his letter No.wg 11018/03/09 -SSC
nN at.24.11.2009. .
oN oo
t
bom (T.Gupta)
a / for Secretary, Railway Board
_ Copy forwarded for info Oe— a
2 1. The Chief Electrical Eni Hiner, .§oC-R lway, Secunderabad-500 071 eReers
os : 3
“~ wt. ait -
io: Igcv
oo Tet A
. gnetur” .
eye Lenco
_ GOVERNMENT OF.INDIA MINISTRY OF RAILWAYS
(RAILWAY BOARD) oN
: No, 2001/CEDO/ORI/39. New Delhi, dated 4-201.2010 a
The Chief Commissioner of Railway Safety, ~~ DRM NER Compound, Ashok Marg, ~ . Lucknow-226001. oe ve
A Sub: Opening of siéw BG iiain line between Kurduwadi and Pandharpur stations (Gauge conversion of NG into BG) on ° Solapur division of Central Railway for public carriage of
“ passengers. ;
~ Ref-(iJCCRS’s Letter No.. R. 12011/01/2001-RS dated ~ 25.07.01 , (ii)CRS’s {Central Circle} _——iletter No. R. ~N -12031/1/2001/CC/12-H/83 dated 03.04.01
With reference: to your endorsement R. 12011 /01/2001-RS dated 25.07.01, the approval of Ministry of Railways is hereby communicated to the ~ recommendation of Commissioner of Railway Safety, Central Circle, Mumbai for opening of the above section for public carriage of passengers as per his > letter No. R. 12031/1/2001/CC/12-H/83 dated 03.04.01. -
oo. . : J —
~ ( T.Gupta ) = ecutive Director Civil Engg.{G)
: e Cm Railway Board. ~
_ No. 2001/CEDO/ORI/39. New Delhi, dated .01.2010
~ Copy forwarded for information to:
~ (i) The Commissioner of Railway Safety, Central Circle, 284 Floor, Churchgate ~ Stn. Bldg. Annexe, M.K. Road, Mumbai-400020, w.r.t. his letter No. R.
12031/1/2001/CC/12-H/83 dated 03.04.01. : ™ (ti) The Chief Administrative Officer (Const.), Central Railway, Mumbai. - (iii)The General Manager (Engg), Central Railway, Mumbai.
4 et ANs _ ~ Riri £ of Reiwaye 4
~ ee ( T.G pta )
A t for Secretary, Railway Board.
~ jaature wo
7 ae at Fe i _ of Neon
GI] S
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
(RAILWAY BOARD)
™~ No. 98/CEDO/ORI/ 12. New Delhi, dated 4—01.2010
< The Chief Commissioner of Railway Safety, | ~ DRM NER Compound, Ashok Marg,
Lucknow-226001. Octet ee
A Sub: Doubling ‘Of few lines between Taloje Pachanand and ; Panvel stations on Diva-Panvel section of Mumbai
- division of Central Railway for public carriage of a passengers.
~ Ref:(i)CCRS’s Letter No. R. 12021/01/98-RS dated 29.01.98 (ii}CRS’s (Central Circle) letter No. C. 12(116)/97/(H)21
” dated 09.01.98
- With reference to your endorsement R. 12021/01/98-RS dated 29.01.98, the approval of Ministry of Railways is hereby communicated to the recommendation of Commissioner of Railway Safety, Central Circle, Mumbai
~ for opening of the above section for public carriage of passengers as per his letter No. C. 12(116)/97/(H)21 dated 09.01.98.
~
5 a
o ( T.Gupta ) ~ Executive Director Civil Engg.(G)
TE Railway Board.
~ No. 98/CEDO/ORI/12. mas New Delhi, dated 01.2010
7 Copy forwarded for information to:
(i) The Commissioner of Railway Safety, Central Circle, 2.4 Floor, Churchgate ~ Stn. Bldg. Annexe, M.K. Road, Mumbai-400020, w.r.t. his letter No. C.
12(116)/97/{H)21 dated 09.01.98. (ii) The Chief Administrative Officer (Const.}, Central Railway, Mumbai.
~ (iii)The General Manager (Engg), Central Railway, Mumbai.
Dp 7 « ( a.dupta ) ~ for Secretary, Railway Board.
"~~
ee ©
pose senate a onmaT rme F se vee
, era & ff
\
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS
(RAILWAY BOARD)
No. 2004/CEDO/ORI/14. New Delhi, dated 4-.01.2010
The Chief Commissioner of Railway Safety, DRM NER Compound, Ashok Marg, Lucknow-22600 1.
Sub: Opening. of the. new. _main 1 line between Latur and Latur
o Road stations of Solapur Division of Central Railway for
~ public carriage of passengers.
“ Ref:(iJCCRS’s Letter No. R. 12011/01/2004-TW dated
~ 09.02.04 . (iij)CRS’s (Central Circle) letter No. Cc.
ns 12(132)/2003/(H)788 dated 31.12.03 seers
~ With reference to your endorsement R.. 12011/01/ 2004-TW dated
09.02.04, the approval of Ministry of Railways is hereby communicated to the
7 recommendation of Commissioner of Railway Safety, Central Circle, Mumbai
for opening of the above section for public carriage of passengers as per his
“~ letter No. C. 12(132)/2003/(H)788 dated 31.12.03. “~ ‘ . _——
nbpt o ( T.Gupta ) ~ (Executive Director Civil Engg.(G)
Railway Board.
.. No, 2004/CEDO/ORI/14. New Delhi, dated .01.2010
é Copy forwarded for information to:
. (i) The Commissioner of Railway Safety, Central Circle, gnd Floor, Churchgate
a Stn. Bldg; Annexe, M.K. Road, Mumbai-400020, w.r.t. his letter No. On
12(132)/2003/(H)788 dated 31.12.03.
~ (ii) The Chief Administrative Officer (Const.), Central Railway, Mumbai.
~ (iii/The General Manager (Engg), Central Railway, Mumbai.
~ ( T.Gupta )
~ for Secretary, Railway Board.
‘ A gIad aiatwiae GOVERNMENT OF INDIA Gl F f
onl yor Bale MINISTRY OF RAILWAYS ve
m3 (Jat BTS RAILWAY BOARD )
No. 2009/CEDO/ SR/60 New Dethi, dt 04.01.2010
an
a General Manager (Engg),
East Central Railway,
= Hajipur.
~ ;
py Sub: Running of Broad Gauge Bogie open wagon ‘type
a -"SBOXNHSM1” (CC+8T+2T)having maximum axle load of
a 22.82t up.to a. maximum speed of 60 kmph(loaded) and 65 ©
a Kmph (Empty) on identified routes of East Central Railway.
a Ref:(iJECR’s letter No. 355-W/CRS /BOXNHSM i(CC+8+2)/
NCR/TM Dt. 24.06.2008 .
mom (ii) RDSO’s letter No MW/SPD/BG/BOXNHSM1/ 22.82t/
an ‘PROV Dated 07.03.2007.
re A case for running of similar wagon i.e. “BOXNHSM1"
~ (CC+8+2) having maximum axle load of 22.82t was received from NCR
A upto a maximumspeed~ of 60 : kmph(loaded) and 65 Kmph (Empty) on
specified routes. © 0" -
mo mS ‘However while examining the case it was observed that the
nn wagon with lesser axle: load:.ies: 22.3:2t(CC+6+2) had been cleared over
A WCR(except Guna-Gwalior section). at a maxi speed of 75 kmph(loaded)
- | and 90 kmph(empty) based'on.the speed certificate of RDSO.
- Accordingy a réference has been sent to RDSO vide Board's
o letter No. 2009/CEDO/SR/55 dt. 01.12.2009 (copy enclosed) wherein
rn RDSO has been requested to examine and revise.: the speed cetficate
~ specialy for running in empty condition.
East Central Railway may take further necessary action
~ accordingly. -
om
- .—
a (T. Gupta)
rt DA: as above - Executive Director, Civil Engg. (G)
. - Railway Board.
on I _-
n Copy to: |
1 The Director General j Power), RDSO,Manak Nagar,Lucknow- .
is 226011, w.r.t. his leer No M SPRAB XNHSM1/22.82t/PROV
i dt. 07.03.07 for n/a. “oN EAD
a | = tl! _ ae Te
’ is. at
1 geatar?
. Elignature .. ....., nc eecummens
mene oor: th Fath ’ han ;
|
Hladt Merete Government Of India
ga warez Ministry Of Railways é (aa AtS) (Railway Board) i
No. 2010/CEDO/SR/30 New Delhi, dated / .03.2011
The General Manager, Central Railway,
Mumbai CST. *
Sub: Running of 8-axled bogie wagon type BCLH loaded with special defence
consignment over entire BG sections of Central Railway up to maximum speed of 40 kph.
Ref: Your office letter no. W.681/Y.115/BR/I, dated 14/12/2010.
In reference to above, sanction of-Ministry of Railways, Railway Beard is hereby communicated for running of B-axléd bogie wagon type BCLH loaded with special defence consignment over entire 8G sections of Central Railway, upto a
maximum speed of 40 Kfgph both in empty and loaded conditions or sectional speed whichever is less, subject-to terms and conditions as given in ROSO's Final Speed’. Certificate and Central Railway's Joint Safety Certificate,Track Certificate & other Certificates accompanying above referred letter.
J Bara Qe [2]. (STTCTTES gare
erent Beers fafa doiftrafioveAc até
No. 2010/CEDO/SR/30 New Delhi, dated ( .03.2011
Copy forwarded for information to :
1. The Chief Commissioner of Railway Safety, Compound of DRM/NER, Ashok Marg, Lucknow -226001 w.r.t. his endorsement no. #4, 13011/18/2010-af, dated. 24.12.10.
2. The Commissioner of Railway Safety, Central Circle, 2nd Floor, Churchgate Stn. Bidg. Annexe, M.K. Road, Mumbai, w.r.t his no. €-11(173)/2008-8 570, dated. 20/21-12-10.
3. Director General, ROSO, Lucknow for information.
4. Executive Director Standards (Motive Power), RDSO, Manak Nagar, Lucknow- 226011, w.r.t. his letter no. MW/CS/BCL, dated. 14.02.07