Download - Turap Cantilever

Transcript
Page 1: Turap  Cantilever

TURAP CANTILEVERYULVI ZAIKA

Page 2: Turap  Cantilever

TURAP

• ASUMSI TURAP MENGALAMI JEPIT DI DALAM TANAH

• KEDALAMAN PEMANCANGAN TURAP AKAN LEBIH DALAM KARENA ASUMSI TERJEPIT

Page 3: Turap  Cantilever

TURAP CANTILEVER DI LAPISAN PASIR

• TAHAP PERHITUNGAN DILAKUKAN BERDASAR GAMBAR DIAGRAM TEKANAN DI ATAS

• MENGHITUNG KOEFISIEN TEKANAN TANAH AKTIF DAN PASIF

sin1

sin1

245tan

1

sin1

sin1

245tan

2

2

p

ap

a

K

KK

K

Page 4: Turap  Cantilever

• +

• KESETIMBANGAN GAYA HORIZONTAL

• P= LUAS ACDE

S MOMEN DI DASAR=0

DIMANA:

)(

2

0)(2

1

2

1

43

435

43543

pp

PLpL

ppLLpP

Page 5: Turap  Cantilever

TURAP CANTILEVER PADA PASIR

Page 6: Turap  Cantilever

KEDALAMAN PEMANCANGAN

• DARI PERHITUNGAN DI ATAS DAPAT DIKETAHUI KEDALAMAN TEORITIK DAN AKTUAL

DIAGRAM TEKANAN YANG SESUNGGUHNYA BERDASARKAN PERHITUNGAN DAPAT DIGAMBAR

Page 7: Turap  Cantilever

MOMEN MAKSIMUM

•MOMEN MAKSIMUM TERJADI PADA GAYA LINTANG = 0, YAITU DI TITIK BERJARAK Z’ DARI E

•MOMEN MAKSIMUM DAPAT DIHITUNG SBB:

•SECTION MODULUS

Page 8: Turap  Cantilever

8

DIMENSI TURAP

• DIMENSI TURAP DAPAT DITENTUKAN BERDASARKAN MOMEN MAKSIMUM YANG HARUS DITAHAN.

• BILA TEGANGAN IJIN MATERIAL TURAP = A, MAKA DIPERLUKAN MODULUS PENAMPANG (SECTION MODULUS) = S

• UNTUK TURAP BAJA DIMENSI DAPAT DITENTUKAN BERDASAR TABEL PROFIL TURAP BAJA.

a

maksMS

Page 9: Turap  Cantilever

TURAP CANTILEVER PADA LEMPUNG

Page 10: Turap  Cantilever

TAHAP PERENCANAAN

• PADA LEMPUNG UNDRAINED HARGA KA=KP=1

• ZONA B, TEGANGAN AKTIF DI BELAKANG TURAP DAN PASIF DI DEPAN TURAP

)'(4

2)(

2)('

216

21

2121

LLcppp

KcKLLzp

KcKLLzLLp

ap

ppsatp

aasata

Page 11: Turap  Cantilever

TEGANGAN TANAH DI BAWAH GARIS KERUK• ZONA C, TEGANGAN PASIF DI BELAKANG TURAP

DAN AKTIF DI DEPAN TURAP

)'(4

2)'(

2

217

21

LLcppp

cDLLp

cDp

ap

satp

sata

Page 12: Turap  Cantilever

KESEIMBANGAN TURAP

• JUMLAH GAYA KE ARAH HORISONTAL = 0

DIMANA P1 = LUAS DIAGRAM TEKANAN ACDE

• DARI PERSAMAAN DI ATAS DIDAPAT

……..(1)

Page 13: Turap  Cantilever

• MOMEN TERHADAP DASAR TURAP=0

=0….(2)

• SUBSTITUSIKAN PERS 1 KE PERS 2

• HITUNG KEDALAMAN

Page 14: Turap  Cantilever

MOMEN MAKSIMUM DAN DIMENSI TURAP

• MOMEN MAKSIMUM TERJADI PADA GAYA LINTANG = 0, MAKA

JARAK DARI DREDGE LINE DIDAPAT Z’ = P/6

• MOMEN MAKSIMUM:

• DIMENSI TURAP DAPAT DITENTUKAN BAHWA MODULUS PENAMPANG YANG DIPERLUKAN:

a

maksMS

Page 15: Turap  Cantilever

15

TABEL: MODULUS PENAMPANG & MOMEN INERTIA

Page 16: Turap  Cantilever