History Saldo Tenaga KerjaPeriode : 2015
MS145430 KPR333001
22-05-2015
08:13:00
Halaman :
Tanggal :
1/1
NPP KODEUNIT
KERJA
NAMA PERUSAHAAN SALDOAWAL
IURAN KLAIM
SALDO IURAN
KOREKSI SALDOAKHIR
JHT
KODENA
PERIODENA
TT021131
TT021131
TT021132
TT021132
000
000
000
000
ABITISARI JAYA UD
ABITISARI JAYA UD
VIRAMA KARYA PROJECT
VIRAMA KARYA PROJECT
AG
AG
12-2013
12-2013
0,00
2.411.052,38
0,00
1.605.724,77
342.000,00
171.000,00
1.539.000,00
342.000,00
163.413,98
1.537,43
5.291,30
66.724,77
17.144,13
178.269,80
82.498,93
2014
2015
2013
2014
PERIODE
2.574.466,36
2.745.466,36
1.605.724,77
0,00
: 13000046618 - 0 - TAHIR KONIYO
HASIL PENGEMBANGAN
2.048.905,26
-2.048.905,26
AMALGAMASI
KPJ - Suffix - Nama TK
: T02 - GORONTALOKantor Cabang
Top Related