Tahir Koniyo
1
History Saldo Tenaga Kerja Periode : 2015 MS145430 KPR333001 22-05-2015 08:13:00 Halaman : Tanggal : 1/1 NPP KODE UNIT KERJA NAMA PERUSAHAAN SALDO AWAL IURAN KLAIM SALDO IURAN KOREKSI SALDO AKHIR JHT KODE NA PERIODE NA TT021131 TT021131 TT021132 TT021132 000 000 000 000 ABITISARI JAYA UD ABITISARI JAYA UD VIRAMA KARYA PROJECT VIRAMA KARYA PROJECT AG AG 12-2013 12-2013 0,00 2.411.052,38 0,00 1.605.724,77 342.000,00 171.000,00 1.539.000,00 342.000,00 163.413,98 1.537,43 5.291,30 66.724,77 17.144,13 178.269,80 82.498,93 2014 2015 2013 2014 PERIODE 2.574.466,36 2.745.466,36 1.605.724,77 0,00 : 13000046618 - 0 - TAHIR KONIYO HASIL PENGEMBANGAN 2.048.905,26 -2.048.905,26 AMALGAMASI KPJ - Suffix - Nama TK : T02 - GORONTALO Kantor Cabang
-
Upload
abdi-wijaya -
Category
Documents
-
view
221 -
download
0
description
hoiyiooip
Transcript of Tahir Koniyo
History Saldo Tenaga KerjaPeriode : 2015
MS145430 KPR333001
22-05-2015
08:13:00
Halaman :
Tanggal :
1/1
NPP KODEUNIT
KERJA
NAMA PERUSAHAAN SALDOAWAL
IURAN KLAIM
SALDO IURAN
KOREKSI SALDOAKHIR
JHT
KODENA
PERIODENA
TT021131
TT021131
TT021132
TT021132
000
000
000
000
ABITISARI JAYA UD
ABITISARI JAYA UD
VIRAMA KARYA PROJECT
VIRAMA KARYA PROJECT
AG
AG
12-2013
12-2013
0,00
2.411.052,38
0,00
1.605.724,77
342.000,00
171.000,00
1.539.000,00
342.000,00
163.413,98
1.537,43
5.291,30
66.724,77
17.144,13
178.269,80
82.498,93
2014
2015
2013
2014
PERIODE
2.574.466,36
2.745.466,36
1.605.724,77
0,00
: 13000046618 - 0 - TAHIR KONIYO
HASIL PENGEMBANGAN
2.048.905,26
-2.048.905,26
AMALGAMASI
KPJ - Suffix - Nama TK
: T02 - GORONTALOKantor Cabang