1 Cor strous dia.25 0.39 m3 2,000,000.00 785,000.00
2 Cor poor 0.8x0.8x0.2 0.39 m3 2,000,000.00 784,000.003 Pekerjaan kolom 25x24 0.32 m3 2,000,000.00 640,000.00
4 alok 15!25 "eton "ertulan# 0.47 m3 2,000,000.00 945,000.00
5 $in# "alok 10!20 utk landasan papan 0.19 m3 2,000,000.00 378,000.00
6 $in# "alok 10!20 atas 0.19 m3 2,000,000.00 378,000.00
7 %antai kerja te"al 5&m 1.50 m3 650,000.00 975,000.00
8 Pasir dipadatkan te"al 5&m 3.00 m3 120,000.00 360,000.00
9 'alian pondasi 4.00 m3 38,700.00 154,800.00
10 or strous dia 25 4.00 ttk 73,000.00 292,000.00
Sub total !"#$!%&&.&&
B PEKERJAAN PASANGAN
1 Pasan# pa(in# te"al 6 &m 18.00 m2 55,000.00 990,000.00
2 Pasan# kanstin dari "ata 2.70 m2 150,000.00 405,000.00
3 Pasan# keramik moti) 30!30 9.00 m2 75,000.00 675,000.00
4 Papan dari ka*u kamper utk dudukan +nis plitur 26.00 "tn# 145,000.00 3,770,000.005 Pasan# "ata mera "a#ian "a-a 5.60 m2 150,000.00 840,000.00
6 Plester dan a&ian 5.60 m2 29,700.00 166,320.00
Sub total "!%'"!2&.&&
C PEKERJAAN ATAP
1 tap as"es #elom"an# 24.00 m2 33,600.00 806,400.00
2 $an#ka atap "aan ka*u 6!12 4.00 "j 125,000.00 500,000.00
3 $an#ka usuk "aan ka*u 5!7 4.00 "j 67,000.00 268,000.00
4 Pla)on #ipsun 55.80 m2 48,000.00 2,678,400.00
5 lisplank 15.00 m1 60,000.00 900,000.00
Sub total !$2!%&&.&&
PENGECATAN AN PAGAR BESI
1 &at ka*u 4.00 m2 24,000.00 96,000.00
2 Cat dindin# 23.85 m2 24,000.00 572,400.00
3 Cat "esi 1.00 ls 100,000.00 100,000.004 Pipa "esi utk pa#ar dia.2/ 20.00 m1 25,000.00 500,000.00
Sub total $!2"%!'&&.&&
JU*LAH $%!##!2&.&&
RENCANA ANGGARAN BIAYA PEKERJAAN SALURAN
No. URAIAN PEKERJAAN QTY. SAT.HARGA SAT. TOTAL
(Rp) (Rp)
A PEKERJAAN SALURAN
1 'ali tana 14.69 m3 38,700.00 568,425.60
2 ru# pasi "a-a pondasi 1.22 m3 140,000.00 171,360.00
3 nstampin# te"al 15&m 1.84 m3 211,000.00 387,396.00
4 Pasan#an "atu kali 7.04 m3 350,000.00 2,463,300.00
5 Cor tutup saluran 0.84 m3 2,500,000.00 2,100,000.00
6 Plesteran 17.68 m2 29,700.00 525,096.00
Ju+la, total "!2$!--."&
7/26/2019 RAB POS RT
2/40
No. URAIAN PEKERJAAN QTY. SAT.HARGA SAT. TOTAL
(Rp) (Rp)
7/26/2019 RAB POS RT
3/40
No. URAIAN PEKERJAAN QTY. SAT.HARGA SAT. TOTAL
(Rp) (Rp)
7/26/2019 RAB POS RT
4/40
No. URAIAN PEKERJAAN QTY. SAT.HARGA SAT. TOTAL
(Rp) (Rp)
7/26/2019 RAB POS RT
5/40
No. URAIAN PEKERJAAN QTY. SAT.HARGA SAT. TOTAL
(Rp) (Rp)
7/26/2019 RAB POS RT
6/40
No. URAIAN PEKERJAAN QTY. SAT.HARGA SAT. TOTAL
(Rp) (Rp)
7/26/2019 RAB POS RT
7/40
No. URAIAN PEKERJAAN QTY. SAT.HARGA SAT. TOTAL
(Rp) (Rp)
7/26/2019 RAB POS RT
8/40
No. URAIAN PEKERJAAN QTY. SAT.HARGA SAT. TOTAL
(Rp) (Rp)
7/26/2019 RAB POS RT
9/40
No. URAIAN PEKERJAAN QTY. SAT.HARGA SAT. TOTAL
(Rp) (Rp)
7/26/2019 RAB POS RT
10/40
No. URAIAN PEKERJAAN QTY. SAT.HARGA SAT. TOTAL
(Rp) (Rp)
7/26/2019 RAB POS RT
11/40
RENCANA ANGGARAN BIAYA
PEKERJAAN PELEBARAN POS RT.22
No. URAIAN PEKERJAAN QTY. SAT.HARGA SAT.
(Rp)
A PEKERJAAN STRUKTUR
1 Cor poor 0.8x0.8x0.2 0.51 m3 1,800,000.00
2 Pekerjaan kolom 25x24 0.84 m3 1,800,000.00
3 alok 15!25 "eton "ertulan# 0.47 m3 1,800,000.00
4 $in# "alok 10!20 utk landasan papan 0.37 m3 1,800,000.00
5 $in# "alok 10!20 atas 0.25 m3 1,800,000.00
6 %antai kerja te"al 5&m 1.50 m3 500,000.00
7 Pasir dipadatkan te"al 5&m 3.00 m3 120,000.00
8 'alian pondasi 4.00 m3 38,700.00
Sub total
B PEKERJAAN PASANGAN
1 Pasan# pa(in# te"al 6 &m 18.00 m2 40,000.00
2 Pasan# kanstin dari "ata 2.70 m2 150,000.00
3 Pasan# keramik moti) 30!30 12.00 m2 108,000.00
4 Papan dari ka*u kamper utk dudukan +nis plitur 40.00 m1 103,000.00
5 Pasan# "ata mera "a#ian "a-a 5.60 m2 150,000.00
6 Plester dan a&ian 5.60 m2 29,700.00
Sub total
C PEKERJAAN ATAP
1 tap as"es #elom"an# 48.00 m2 33,600.00
2 $an#ka atap "aan ka*u 6!12 6.00 "j 139,900.00
3 $an#ka usuk "aan ka*u 5!7 6.00 "j 65,100.00
4 Pla)on #ipsun 60.00 m2 45,000.00
5 lisplank ka*u kamper 15.00 m1 88,000.00
Sub total
PENGECATAN AN PAGAR BESI
1 &at lisplank 4.20 m2 27,000.00
2 Cat dindin# 23.85 m2 32,000.00
3 Cat kolom 11.93 m2 32,000.00
4 Cat pintu dan kusen 4.00 m2 27,000.00
5 Pipa "esi utk pa#ar dia.2/ 5.00 "tn# 125,000.00
Sub total
JU*LAH
7/26/2019 RAB POS RT
12/40
No. URAIAN PEKERJAAN QTY. SAT.HARGA SAT.
(Rp)
7/26/2019 RAB POS RT
13/40
No. URAIAN PEKERJAAN QTY. SAT.HARGA SAT.
(Rp)
7/26/2019 RAB POS RT
14/40
No. URAIAN PEKERJAAN QTY. SAT.HARGA SAT.
(Rp)
7/26/2019 RAB POS RT
15/40
No. URAIAN PEKERJAAN QTY. SAT.HARGA SAT.
(Rp)
7/26/2019 RAB POS RT
16/40
No. URAIAN PEKERJAAN QTY. SAT.HARGA SAT.
(Rp)
7/26/2019 RAB POS RT
17/40
No. URAIAN PEKERJAAN QTY. SAT.HARGA SAT.
(Rp)
7/26/2019 RAB POS RT
18/40
No. URAIAN PEKERJAAN QTY. SAT.HARGA SAT.
(Rp)
7/26/2019 RAB POS RT
19/40
No. URAIAN PEKERJAAN QTY. SAT.HARGA SAT.
(Rp)
7/26/2019 RAB POS RT
20/40
No. URAIAN PEKERJAAN QTY. SAT.HARGA SAT.
(Rp)
7/26/2019 RAB POS RT
21/40
TOTAL
(Rp)
921,600.00
1,518,750.00
850,500.00
663,840.00
453,600.00
750,000.00
360,000.00
154,800.00
!"-!&.&&
720,000.00
405,000.00
1,296,000.00
4,120,000.00
840,000.00
166,320.00
-!'-!2&.&&
1,612,800.00
839,400.00
390,600.00
2,700,000.00
1,320,000.00
"!%"2!%&&.&&
113,400.00
763,200.00
381,600.00
108,000.00
625,000.00
$!##$!2&&.&&
22!&-'!'$&.&&
7/26/2019 RAB POS RT
22/40
TOTAL
(Rp)
7/26/2019 RAB POS RT
23/40
TOTAL
(Rp)
7/26/2019 RAB POS RT
24/40
TOTAL
(Rp)
7/26/2019 RAB POS RT
25/40
TOTAL
(Rp)
7/26/2019 RAB POS RT
26/40
TOTAL
(Rp)
7/26/2019 RAB POS RT
27/40
TOTAL
(Rp)
7/26/2019 RAB POS RT
28/40
TOTAL
(Rp)
7/26/2019 RAB POS RT
29/40
TOTAL
(Rp)
7/26/2019 RAB POS RT
30/40
TOTAL
(Rp)
7/26/2019 RAB POS RT
31/40
BAHAN UTK PEKERJAAN PELEBARAN POS RT.22
No. KEBUTUHAN *ATERIAL QTY. SAT.HARGA SAT. TOTAL
(Rp) (Rp)
A BAHAN UNTUK PELEBARAN POS
1 pasir &or 4.00 m3 125,000.00 500,000.00
2 ata mera 600.00 "j 2,000.00 1,200,000.00
3 emen #resik 40 k# 21.00 ak 52,000.00 1,092,000.00
4 esi tulan#an dia.12 19.00 ljr 87,000.00 1,653,000.00
6 esi tulan#an dia.8 13.00 ljr 43,000.00 559,000.00
7 Pa(in# te"al 6 &m 18.00 m2 52,000.00 936,000.00
8 s"es #elom"an# 8.00 l"r 92,000.00 736,000.00
9 a*u 6!12 5.00 "tn# 125,000.00 625,000.00
10 a*u 5!7 5.00 "tn# 67,000.00 335,000.00
11 a*u 3!7 5.00 "tn# 45,000.00 225,000.00
12 'ipsun 56.00 "tn# 48,000.00 2,688,000.00
13 Papan lisplank 2!20 5.00 "tn# 60,000.00 300,000.00
14 Papan meranti "atu 3!20 26.00 "tn# 145,000.00 3,770,000.00
15 oral 3.00 m3 254,000.00 762,000.00
16 eramik 30!30 kasar 9.00 m2 48,000.00 432,000.00
17 Cat tem"ok 2.00 k# 95,000.00 190,000.00
18 Cat ka*u 2.00 k# 65,000.00 130,000.00
19 Cat "esi 2.00 k# 62,000.00 124,000.00
20 Paku 3.00 k# 13,000.00 39,000.00
21 endrat 5.00 k# 15,300.00 76,500.00
Ju+la, total $"!2#"!&&&.&&
BAHAN UTK PEKERJAAN PE*BUATAN SALURAN
No. KEBUTUHAN *ATERIAL QTY. SAT.
HARGA SAT. TOTAL
(Rp) (Rp)
1 atu kali 9.95 m3 154,000.00 1,532,608.00
2 emen 20.88 ak 52,000.00 1,085,760.00
3 Pasir 4.68 m3 125,000.00 585,000.00
4 oral 1.00 m3 254,000.00 254,000.00
5 esi tulan#an dia.12 31.00 ljr 87,000.00 2,697,000.00
Ju+la, total "!$'!"%.&&
21
7/26/2019 RAB POS RT
32/40
No. KEBUTUHAN *ATERIAL QTY. SAT.HARGA SAT. TOTAL
(Rp) (Rp)
7/26/2019 RAB POS RT
33/40
No. KEBUTUHAN *ATERIAL QTY. SAT.HARGA SAT. TOTAL
(Rp) (Rp)
7/26/2019 RAB POS RT
34/40
No. KEBUTUHAN *ATERIAL QTY. SAT.HARGA SAT. TOTAL
(Rp) (Rp)
7/26/2019 RAB POS RT
35/40
No. KEBUTUHAN *ATERIAL QTY. SAT.HARGA SAT. TOTAL
(Rp) (Rp)
7/26/2019 RAB POS RT
36/40
No. KEBUTUHAN *ATERIAL QTY. SAT.HARGA SAT. TOTAL
(Rp) (Rp)
7/26/2019 RAB POS RT
37/40
No. KEBUTUHAN *ATERIAL QTY. SAT.HARGA SAT. TOTAL
(Rp) (Rp)
7/26/2019 RAB POS RT
38/40
No. KEBUTUHAN *ATERIAL QTY. SAT.HARGA SAT. TOTAL
(Rp) (Rp)
7/26/2019 RAB POS RT
39/40
No. KEBUTUHAN *ATERIAL QTY. SAT.HARGA SAT. TOTAL
(Rp) (Rp)
7/26/2019 RAB POS RT
40/40
No. KEBUTUHAN *ATERIAL QTY. SAT.HARGA SAT. TOTAL
(Rp) (Rp)