Sl. No Name of bridge ConstituencyDesign file
No.Remarks/Status DD AD
KASARGOD DISTRICT
1 ORCHA Bridge Thikkarippur 14/2011 Design Completed in Feb 2013 BE3 AD9
2 NELLIKKUNNU bridge Kasaragod 53/2012 Design Completed in Nov 2013 BE1 AD8
3 PADAMCODE bridge Uduma 66/2012 Design Completed in Jan 2014 BE3 AD2
4 BAKILAPADAVU Bridge Manjeswar 64/2013 Design Completed in Mar 2015 BE3 ABE4
5 PAINIKKARA bridge 34/2015 Design Completed in Aug 2016 BE1 AD2
6 KANNAMKAI bridge Thrikkarippur 60/2014 Design Completed in Oct 2016 BE4 AD6
7 KOTTEKANNI Bridge Kasaragod 86/2013 Design Completed in Oct 2016 BE1 AD2
8 THOTTUKARA bridge Thrikkarippur 11/2011 Design Completed in Nov 2016 BE2 AD4
9 VIDYAGIRI Bridge 06/2015 Design completed in Dec 2016 BE1 AD5
10 VANHANGAD bridge Uduma 66/2014 Design Completed in Jan 2017 BE1 AD3
11 KALLAR Bridge Kanhangad 68/2012DD prepared. Awaiting feasibility report from CE(R&B)
BE4 AD9
12 ATHANADI bridge Uduma 68/2013 TGAD completed in Apr 2014. BE1 AD9
13 ARILKADAVU Bridge Thrikkarippur 43/2014 GAD completed in Sep 2015. Awaiting AS BE1 AD8
14 Bridge in UDUMA-MULLACHERI road Uduma 65/2014 GAD completed in Sep 2015. Awaiting AS BE3 AD4
15 PERUMBATTA Bridge Thikkarippur 76/2013 GAD completed in Jan 2016. Awaiting AS BE3 AD2
16 ODANKAL bridge 58/2015 TGAD under preparation BE1 AD8
17 PALLATHUMPARA bridge 61/2015 GAD completed in Sept2017. DD under review BE2 ABE10
18 KUTHUPULLU bridge Manjeswar 20/2013Proposal Dwg completed in Mar 2013. Awaiting feasibility report from CE(R&B)
BE2 ABE12
19 MUNNIPADI bridge Manjeswar 88/2013Proposal Dwg completed in Dec 2013. Awaiting feasibility report from CE(R&B)
BE3 ABE12
20 THUPPAKKAL Bridge 26/2016Proposal Dwg completed in Nov 2016. Awaiting feasibility report from CE(R&B)
BE1 ABE12
21 ARAMANAPADY bridge 31/2016 TGD despatched BE1 AD9
22 POTHANKANDAM bridge 41/2016 TGD completed in March 2018 BE3 ABE12
23 MUNAMBAM Udma 10/2015Awaiting reply for clarification sent to CE(R&B) on 16.11.15 regarding shifting of alignment.
BE3 ABE12
24 AYAMKADAVU Bridge Uduma 02/2015Proposal drawing completed in Feb 2015. Awaiting feasibility & clarification
BE4 ABE12
25 RAMANCHIRA Bridge 56/2017 TGD completed in DEc2017 BE4 ABE12
26 KILTAKKAYAM Bridge 55/2017 TGD completede Feb 2017 BE4 ABE10
27 KALIKKADAVU Bridge 57/2017 TGD to be revised BE4 ABE11
28 Bridge at KILIYALAM 52/2017 TGD completed Mar 2018 BE4 ABE12
29 PALATHARA Bridge 27/2018 TGD completed in April 2018 BE4 ABE12
30 CHERANAMTHALA Bridge 26/2018 TGD putup. BE4 ABE12
KANNUR DISTRICT
1 MAMBARAM Bridge(Revision) 4/2007 DD despatched. BE4 ABE11
2 MANDAMCHERY Bridge 8/2012 Design Completed in Jan 2014 BE1 AD8
3 MANIYANKOLLY Bridge 11/2013 Design Completed in Apr 2015 BE3 AD1
4 MANIKKAL bridge Thaliparambu 19/2013 Design Completed in Nov 2015 BE3 AD7
5 ARENGAD bridge Mattanoor-peravoor
14/2013 Design Completed in Mar 2016 BE2 AD1
6 THUNDI (Thundiyil) Bridge Peravoor 12/2012 Design Completed in Jul 2016 BE1 AD6
7 KACHERIKADAVU bridge Peravoor 51/2012 DD despatched in Jan 2018. BE4 ABE11
8 Kottakkeel Kadavu-Pattuvam bridge 46/2012 GAD completed in Feb 2013. Awaiting AS. BE1 AD6
9 KOOLIKKADAVU bridge Mattanoor 16/2013 GAD completed in Jul 2013. Awaiting AS. BE1 AD6
STATUS OF BRIDGE DESIGN WORKS AS ON 14-05-2018
Page 1
Sl. No Name of bridge ConstituencyDesign file
No.Remarks/Status DD AD
STATUS OF BRIDGE DESIGN WORKS AS ON 14-05-2018
10 NUCHIYAD bridge (Revision) Irikkur 01/2014 GAD completed in Feb 2014. Awaiting AS. BE4 AD1
11 NANICHERKADAVU BRIDGE Azhikode 69/2013 GAD completed in Jul 2014. Awaiting AS. BE1 AD9
12 ALAKKATT bridge Kaliissery 87/2013 GAD completed in Jan 2015. Awaiting AS. BE4 AD2
13 KOLANTHAKKADAVU bridge Irikkur 45/2014 GAD completed in Apr 2015. Awaiting AS. BE1 AD3
14 CHUNGAKUNNU bridge Peravoor 51/2014 DD despatched in Dec 2017 BE4 ABE11
15 VALAYAMCHAL bridge 69/2014 GAD completed in Sep 2015. Awaiting AS. BE3 AD7
16 VANNATHIKKADAVU bridge 11/2015 GAD completed in Sep 2015. Awaiting AS. BE3 AD7
17 ALEX NAGAR-KANHILERI bridge Payyannur 60/2015 DD despatched Jan2018 BE4 ABE11
18 CHANOKUNDU bridge (Revision) 17/2013 GAD completed in Sept 2016. Awaiting AS. BE2 AD4
19 CHENGALYI bridge 3/2016 GAD completed in Nov 2016. Awaiting AS. BE4 AD7
20 CHOVVA Bridge 16/2016 Work completed. BE1 AD9
21 CHEKKUPALAM 06/2014 TGAD completed in Nov 2016. Awaiting AS. BE1 AD8
22 KUNDUCHIRA Bridge 10/2005 GAD completed in Dec 2016. Awaiting AS. BE4 AD7
23 MANKARA Bridge 38/3016 GAD completed in Dec 2016. Awaiting AS. BE4 AD7
24 ALAKKODE bridge (Revision) Irikkur 13/2013 Revised TGAD completed in Dec 2016. BE4 AD7
25 KARUVANCHAL Bridge (Revision) Irikkur 15/2013 GAD completed in Jan 2017. Awaiting AS. BE3 AD2
26 Puthur Bridge 02/2017 Revised TGDdespatched Feb 2018 BE4 ABE11
27 VATTOLI Bridge Mattannur 21/2014 Revised TGAD completed in Mar 2017. BE4 AD6
28 VADAVANTHOOR Bridge 17/2016TGAD completed in Mar 2017. Feasibility from EE received
BE4 ABE11
29 CHOOLAKADAVU bridge Payyannur 05/2016 Revised TGD despatched on Oct 2017 BE4 ABE11
30 ODENTHODU bridge (Rev) Peravoor 52/2014 Revised TGAD completed in Apr 2017. BE2 AD6
31 THATTARI bridge Darmadom 26/2014 TGD completed in Apr 2017 BE3 AD1
32Dilapidated condition of Pazhayangadi Bridge(Repair &rehabitation)
28/2017 Rehabilitation report despatched BE4 AD7
33 MOOLAKEEL KADAVU Bridge Payyannur 26/2010 TGD to be revised. BE3 ABE11
34 KALLACHERIKADAVU bridgeKoothuparamb
u67/2012 TGD completed on Aug 2017 BE4 ABE11
35 PONNIYAM RANDAMKADAVU Bridge 54/2014Proposal Dwg completed in Nov 2014. Awaiting feasibility report from CE(R&B)
BE1 ABE11
36 MANNAMKUNDU KADAVU Bridge 10/2016Proposal Dwg completed in May 2016. Awaiting feasibility report from CE(R&B)
BE4 ABE11
37Bridge across Kundoor puzha on Anapanthi-Angadikadavu road
03/2017 TGD to be prepared BE4 ABE11
38 KALLIKANDY BridgeKoothuparamb
u04/2017 TGD despatched on April 2018 BE4 ABE11
39 KUNDOORPUZHA bridge Peravoor 20/2014Awaiting reply of clarification regarding alignmentt plan, design data, soil report sent to CE(R&B) in Mar 2014.
BE3 ABE11
40Bridge in St Jude Nattel road at Ayyankunnu
56/2014Awaiting reply of clarification sent to CE(R&B) in Oct 2014 regarding bore hole and design data.
BE3 ABE11
41 MEENKUNNU NEERKADAVU bridge Azhikode 28/2015Awaiting reply of clarification sent to CE(R&B) in Jun 2015 regarding investigation report and approved alignment plan.
BE2 ABE11
Page 2
Sl. No Name of bridge ConstituencyDesign file
No.Remarks/Status DD AD
STATUS OF BRIDGE DESIGN WORKS AS ON 14-05-2018
42 Vengara ROB Kallyaseri 37/2016 TGD despatched on March 2018 BE4 ABE11
43 Thuruthy bridge(Revision) Design completed in Jan 2007. To be revised .
44 PULINJOLI KADAVU Bridge Dharmadam 71/2017 TGD despatched Feb 2018 BE4 ABE11
45 Bridge across NEDUVOT River 72/2017 TGD UP BE4 ABE11
46 THURUTHIMUKKU Bridge Kuthuparambu 74/2017 TGD despatched on Feb 2018 BE4 ABE11
47Cherikkal-Kottam bridge across Anjarakkandi river
Dharmadam 2018/08 TGD despatched on March 2018 BE4 ABE11
WAYANAD DISTRICT
1 POLLAMPARA Bridge 41/2012 Design Completed in Dec 2013 BE3 AD1
2 THALIPPARAKKADAVU Bridge(Rev) 41/2013Design Completed in Aug 2014. Letter mentioning revised concrete mix despatched on Apr.2017.
BE3 AD2
3 PANANTHARA Bridge 18/2015 Design Completed in Feb 2016 BE2 AD2
4 CHERUPUZHA Bridge 16/2015 Design Completed in Feb 2016 BE1 AD7
5 PATHIRI bridge (NH Dvn) 49/2014 Design Completed in Jan 2017 BE3 AD1
6 MAMBILICHIKADAVU Bridge(Rev.) 80/2013GAD completed in Dec 2014. Revised GAD to be prepared..
BE1 AD9
7 VALLERY PARAKKADAVU Bridge 05/2014 GAD completed in Dec 2014. Awaiting AS. BE2 AD4
8 PULIKKATTUKADAVU Bridge 62/2017 Clarification received. TGD under prep. BE4 ABE12
KOZHIKODE DISTRICT
1 ELENTHKADAVU bridge 22/2013 Design Completed in Aug 2014 BE4 AD4
2 KORAPUZHA Bridge in NH 17 (Bypass) 8/2014 Design Completed in Nov 2014 BE4 AD7
3PURAKKATTIRI Bridge in NH 17 (Bypass)
9/2014 Design Completed in Nov 2014 BE4 AD7
4 CHEDIALAKKADAVU bridge 63/2012 Design Completed in Feb 2016 BE2 ABE4
5 PALLIPADI bridge 26/2015 Design Completed in Dec 2016 BE3 AD5
6 MARAPPALAM Bridge 106/2013 Revised GAD &DD completed in Feb 2017. BE3 AD9
7 PUTHIYAPALAM Bridge 08/2013GAD completed in May 2014. Revised TGD completed in Oct 2017
BE4 ABE10
8 PATHAYAPARA Bridge 25/2013 GAD completed in Jul 2014. Awaiting AS. BE2 AD4
9 ULLOORKADAVU bridge 7/2006 GAD completed in Jun 2015. Awaiting AS. BE2 AD4
10 ERUDE Bridge 2/2014 GAD completed in Feb 2016. Awaiting AS. BE4 AD5
11 Bridge across Neelithodu 31(2)/2015 Work completed.. BE2 AD9
12 KURIKKALTHODIKA KADAVU bridge 43/2015 GAD completed in Mar 2016. Awaiting AS. BE3 AD1
13 Flyover at THONDAYAD (NH 17) 27/2015 Work completed. BE4 AD7
14 Flyover at RAMANATTUKARA (NH17) 31(1)/2015 Work completed. BE2 AD9
15 Bridge at AZHEEKKAL KADAVU 08/2011Draft GAD approved. Kept in abeyance till further request for design
BE4 ABE11
16 THONDAYAD Flyover 62/2015GAD completed in May 2016. Detailed Dwg of sub structure despatched.
BE4 AD7
17 Bridge at NADUTHURUTHY 17/2015TGD completed in Jul 2016.TGD revised as per CE(R&B)s request
BE1 AD6
18 Bridge at THORAYILKADAVU 21/2015 Revised GAD completed in Mar 2017. BE1 AD8
19 KOOLIMADU Bridge(rev) 15/2005 Revised TGAD completed in Mar 2017 BE1 AD9
20 AKALAPUZHA bridge (Rev.) 15/2015 Revised GAD completed in Apr 2017 BE4 ABE11
21 CHEMPUKKADAVU bridge(rev.) 40/2013 Revised GAD despatched on Apr 2017 BE1 AD9
Page 3
Sl. No Name of bridge ConstituencyDesign file
No.Remarks/Status DD AD
STATUS OF BRIDGE DESIGN WORKS AS ON 14-05-2018
22 THOTTUMUKKOM bridge 31/2013GAD completed in May 2017.DD completed OCT 2017
BE4 ABE10
23 KORAPUZHA bridge (Reconstruction) 59/2015 TGAD completed in May 2017 BE4 ABE3
24 THONDILAKADAVU bridge(Rev) 60/2013GAD completed in Nov 2013. Revised TGD despatched on July 2017.Further clarification letter despatched.
BE1 AD8
25 PADANILAM bridge 59/2013 TGD completed in Dec 2017. BE4 ABE10
26 KAKKAD KADAVU bridge 26/2013Proposal Dwg completed in Mar 2013. Awaiting feasibility report from CE(R&B)
BE4 ABE10
27 MOONAMPUZHA Bridge 50/2013Proposal Dwg completed in Jun 2013. Awaiting feasibility report from CE(R&B)
BE4 ABE10
28 POOLAKKADAVU bridge 57/2013Proposal Dwg completed in Jun 2013. Feasibility from EE received.
BE4 ABE10
29 MUKKATHKADAVU bridge 07/2014Proposal Dwg completed in Aug 2014. Awaiting feasibility report from CE(R&B)
BE4 ABE10
30 PARAKKADAVATHU bridge Perambra 58/2014Proposal Dwg completed in Oct 2014. Awaiting feasibility report from CE(R&B)
BE4 ABE10
31 KOTTAKKADAVU Bridge 40/2014Proposal Dwg completed in Mar 2015. Awaiting feasibility report from CE(R&B)
BE4 ABE10
32 Bridge at OLAVANA PALLIKADAVU 29/2015Proposal Dwg completed in Sep 2015. Awaiting feasibility report from CE(R&B)
BE4 ABE10
33 NADUTHODU bridge Nadapuram 57/2015Proposal Dwg completed in Jan 2016. Awaiting feasibility report from CE(R&B)
BE4 ABE10
34 PUZHAMBURAM bridge 36/2015Proposal Dwg completed in Jul 2016. Awaiting feasibility report from CE(R&B)
BE4 ABE10
35 PULIMOOTTIL Bridge 24/2016TGD to be prepared. Kept pending as no urgency reporetd by AEE
BE4 ABE10
36 CHENAYI KADAVU Bridge 17/2017 TGD completed in Oct 2017 BE4 ABE10
37Grade separator Eranhipalam on NH 766
40/2016 TGD completed in Oct 2017 BE4 ABE10
38 OTTATHANNIPALAM Bridge 18/2017 TGD under preparation BE4 ABE10
39 KARIKUTTY KADAVU Bridge 22/2017 TGD to be prepared. BE4 ABE10
40Bridge at KOYAMBRATHKANDI KADAVU
14/2015Awaiting reply of clarification sent to CE(R&B) in Jun 2015.
BE3 ABE10
41 Bridge at PADERIKADAVU Kunnamangalam 20/2015Awaiting reply of clarification sent to CE(R&B) in Jun 2015.
BE4 AD2
42 NADERIKKADAVU bridge 48/2014 TGD completed in May-2018 BE4 ABE10
43 THRIKUTTISERRY Bridge 42/2017 TGD completed in August 2017 BE4 ABE10
44 MUZHAPPALAM bridge 41/2017 TGD completed in Oct 2017. BE4 ABE10
45 Subways - 2 Nos NIT Calicut 58/2017TGDcompleted in Feb 2018.GD finalized in May-2018
BE4 ABE10
46 Poonoor Bridge 59/2017 TGD completed in January 2018. BE4 ABE10
47 Chavaramuzhi Bridge 70/2017 TGD under preparation. BE4 ABE10
48 Moorad Bridge 75/2017 TGD completed Feb 2018 BE4 ABE10
49 Munnamannilkadavu Bridge 2018/07 TGD completed Mar 2018 BE4 ABE10
50 Iringal - Moorad ROB 2018/13 TGD completed in April 2018 BE4 ABE10
MALAPPURAM DISTRICT
1 CHEERPUNGALTHODU Bridge Thirungadi 46/2010 Design Completed in Aug 2013 BE4 AD5
2 VADAPURAM bridge Nilambur 15/2012 Design Completed in Aug 2013 BE2 AD9
3 MELATTUR(Ucharakadavu) Bridge Perinthalmanna 7/2012 Design Completed in May 2014 BE2 AD3
4 THAZHEPALAM bridge Thirur 63/2013Design Completed in Nov 2014.Design of the retaining wall - RE wall recommended.
BE4 AD4
5 THALIYANKUNDU Bridge Wandoor 105/2013 Design completed in Dec 2014 BE3 AD3
6 CHEBRAPALLIYALIl bridge 55/2014 Design completed in Jan 2015 BE2 AD1
Page 4
Sl. No Name of bridge ConstituencyDesign file
No.Remarks/Status DD AD
STATUS OF BRIDGE DESIGN WORKS AS ON 14-05-2018
7 MAMPURAM BridgeVengara/Thirur
angadi59/2012 Design Completed in Jan 2015 BE4 AD7
8 PATHIKUZHI bridge Kondotti 24/2012 Design Completed in Apr 2015 BE3 AD1
9 KOOTAPADI Bridge Nilambur 57/2012 Design completed in Sep 2015 BE1 AD7
10 MANNATHIKADAVU Bridge Perinthalmanna 92/2013 Design completed in Feb 2016 BE4 AD9
11 KOOJOOLIKADAVU Tirur 28/2011 Design Completed in Mar 2016 BE3 AD1
12 PERUMKADAVU bridge Eranadu 27/2012 Design completed in Apr 2016 BE2 AD4
13PARAPPANANGADI- PALATHINGAL bridge
Thirurangadi 89/2013 Revised GD UP BE1 ABE8
14 CHOTTUKADAVU Bridge Eranadu 43/2012 Design completed in Nov 2016 BE1 AD7
15 MANANTHALAKADAVU bridge Kondotti 38/2012 Design completed in Jan 2017 BE2 AD7
16 PUTHUR bridge Kottakkal 67/2014 Design completed in May 2017 BE2 AD6
17 ELAMARAM KADAVU bridger Kondotti 28/2012 GAD completed in Dec 2012. Awaiting AS. BE1 AD1
18 ARYANTHODIKA bridge Eranadu 44/2012 Revised TGD despatched BE 3 ABE 8
19 MARATHINKADAVU bridge Nilambur 49/2012 GAD completed in Jun 2013. Awaiting AS. BE2 AD9
20 KALIKADAVU Bridge a/s Kadalundi river Vengara 83/2013 GAD completed in Oct 2013. Awaiting AS. BE2 AD9
21 KARIYANNUR bridge 79/2013 GAD completed in Jul 2014. Awaiting AS. BE2 AD4
22 Bridge at CHENDI Mangada 09/2015 GAD completed in Aug 2015. Awaiting AS. BE1 AD9
23 KAKKATHODU Bridge Wandoor 12/2008 GAD completed in Sep 2015. Awaiting AS. BE3 AD2
24 CHETHU PALAM bridge 50/2015 GAD completed in Jan 2016. Awaiting AS. BE3 AD4
25 PANNIKOTTUMUNDA bridge Malappuram 53/2014 GAD completed in Aug 2016. Awaiting AS. BE1 AD7
26 PANAMPALAM Bridge(Revision) 42/2009 GAD completed in Oct 2016. Awaiting AS. BE4 AD7
27 Bridge at BADHARPALLI 12/2015 GAD completed in Nov 2016. Awaiting AS. BE2 AD1
28 OLAMPAKADAVU bridge(Revision) Ponnani 17/2012 TGAD completed in Nov 2016. Awaiting AS. BE4 AD7
29PARAPPANANGADI - NEW CUTT bridge
13/2015 GAD completed in Dec 2016. Awaiting AS. BE1 AD2
30 AALAM bridge(Revision) Ponnani 9/2012 Revised TGD Despatched in Dec 2016. BE3 AD1
31 KALIKADAVU bridge a/s Thootha river Perinthalmanna
84/2013 GAD completed in Jan 2017. BE3 AD1
32 Enathi Bridge 39/2016 TGD completed in Feb. 2017. BE2 AD4
33 POOKAITHAKADAVU Bridge (NH Dvn) 29/2013 GAD despatched in Mar 2017. BE2 AD5
34 ROB at TIRUR 45/2015 TGAD completed in Apr. 2017. BE1 AD9
35 PATTARKADAVU Bridge Malappuram 28/2014 GD approved. BE4 ABE8
36 Flyover at JASEELA JUNCTION Manjeri 90/2013 Awaiting clarification BE1 ABE8
37Bridge at CHAMRAVATTOM (Karma road Bridges)
Ponnani 37/2017 TGD despatched Nov 2017 BE3 AD9
38Bridge across CANOLI canal (Karma road Bridges)
Ponnai 36/2017 TGD despatched Nov 2017 BE4 AD7
39 PERUMTHURUTHY KADAVU Bridge 10/2017 Revised TGD UP. BE3 ABE8
40 THOOTHAPUZHA Bridge Perintalmanna 14/2008Proposal Dwg completed in Nov 2008. Awaiting feasibility report from CE(R&B)
BE4 ABE8
41 PUZHAKKATHARA Bridge Tirur 21/2008Proposal Dwg completed in Mar 2012. Awaiting feasibility report from CE(R&B)
BE1 ABE8
42 MARANCHERI bridge Ponnani 14/2012Proposal Dwg completed in Jul 2013. Awaiting feasibility report from CE(R&B)
BE1 ABE8
43 Bridge acrossTHUVAKKADU thodu Malappuram 85/2013Proposal Dwg completed in Nov 2013. Awaiting feasibility report from CE(R&B)
BE3 ABE8
44 AKUMBAR bridge Wandoor 93/2013Proposal Dwg completed in Dec 2013. Awaiting feasibility report from CE(R&B)
BE3 ABE8
45 PARUTHIPPATTA-PERIYANGAD Bridge Wandoor 100/2013Proposal Dwg completed in Dec 2013. Awaiting feasibility report from CE(R&B)
BE2 ABE8
Page 5
Sl. No Name of bridge ConstituencyDesign file
No.Remarks/Status DD AD
STATUS OF BRIDGE DESIGN WORKS AS ON 14-05-2018
46 IRUMBOTHINGAL KADAVU Bridge Vallikkunnu 91/2013Proposal Dwg completed in Dec 2013. Awaiting feasibility report from CE(R&B)
BE2 ABE8
47KOOTTILATHARA - MANJUKADAVU Bridge
Thirur 101/2013Proposal Dwg completed in Jan 2014. Awaiting feasibility report from CE(R&B)
BE3 ABE8
48 AKKIPURAM bridge 39/2015Feasibility report received. GD under preparation.
BE3 ABE8
49 CHOORIYODU bridge 13/2016Proposal Dwg completed in Jul 2016. Awaiting feasibility report from CE(R&B)
BE3 ABE8
50 Bridge at THUPPANAD 14/2016Proposal Dwg completed in Oct 2016. Awaiting feasibility report from CE(R&B)
BE2 ABE8
51 POORAPUZHA Bridge Thirurangadi 29/2011Awaiting reply of clarification sent to CE(R&B) in Jan 2012 regarding Approval from CRZ, requirement of Bridge cum regulator.
BE1 ABE8
52 MUDHIYAM BEACH Bridge Vallikunnu 48/2013Awaiting reply of clarification sent to CE(R&B) in May 2013 regarding CRZ.
BE4 ABE8
53 PUTHIYAKADAPPURAM bridge Thirur 94/2013Awaiting reply of clarification sent to CE(R&B) in Nov 13, regarding vertical clearance, capacity of friction piles, etc.
BE1 ABE8
54 Mampadu Bridge 16/2005 Proposal despatched. Awaiting feasibility ABE8
55 Nayarthodu Bridge 68/2017 TGD UP BE 3 ABE8
56 Parappanagaadi - Paalatthingal 89/2013 DD UP BE 3 ABE8
57 Kundukadavu Bridge 2018/4 TGD despatched BE 3 ABE8
58 KAKKATHODU Bridge 2018/11 TGD despatched BE 3 ABE8
59 Kariyamthodu Bridge 2018/09 TGD despatched BE 3 ABE8
57 Thirur-Kadalundy RoB 2018/10 CL Despatched BE 3 ABE8
58 Muttikadavu bridge 24/2018 TGD despatched BE3 ABE8
59 Kadavanad bridge 50/2018 TGD UP BE3 ABE8
PALAKKAD DISTRICT
1 KOOLIYATTUKADAVU Bridge (Rev) 31/2010 Design Completed in Jun 2014 BE1 AD9
2 PALOLIKUNDU bridge 34/2014 Design Completed in Feb 2016 BE1 AD8
3 NJETTARAKKADAVU Bridge 49/2010 GAD completed in Jun 2013. Awaiting AS. BE4 AD5
4 Bridge b/w MAPPATTUKARA & ELADU 33/2014 GAD completed in Apr 2016. Awaiting AS. BE1 ABE9
5 Bridge at PALLIKADAVU 42/2015 GAD completed in Jul 2016. Awaiting AS. BE3 AD2
6 PUZHAKKALPADI Bridge (Revision) 48/2010 GAD completed in Dec 2016. Awaiting AS. BE3 ABE9
7 KANNANKUNDU KADAVU bridge(Rev) 62/2012 Revised TGD completed in May 2017 BE3 ABE9
8Bridge across Mulanjoorthode in Palappuram-Kuthiravazhi road
25/2017 TGD despatched on Jan 2018 BE2 ABE5
9 Arangattukadavu Bridge 29/2017 TGD completed. Revised GD despatched BE1 AD9
10 OOTTARA Bridge 32/2015 TGD completed in Aug 2017 BE4 AD3
11 CHULLIMAD Bridge 31/2017 Revised TGD putup BE3 ABE9
12Bridge at Kampa over Kalpathi River (Rev.)
50/2010 Revised TDG despatched Dec 2017 BE4 ABE8
13 MENONPARA bridge 25/2012Proposal Dwg completed in Jul 2012. Awaiting feasibility report from CE(R&B)
BE1 ABE9
14 CHETTIKKAD - AMBZHAKODE Bridge 22/2015Proposal Dwg completed in Sep 2015. Awaiting feasibility report from CE(R&B)
BE1 ABE9
15 NJAVALKKADU Bridge 66/2017 TGD despatched ABE8
16 Bridge across KPIP canal 82/2017 TGD despatched ABE8
17 Bridge at Malampuzha ring road 2/2018 TGD despatched. BE3 ABE7
Page 6
Sl. No Name of bridge ConstituencyDesign file
No.Remarks/Status DD AD
STATUS OF BRIDGE DESIGN WORKS AS ON 14-05-2018
18 East Ottappalam bridge 12/2018 TGD despatched. BE3 ABE7
19 Kanniyampuram Bridge 12/2018 TGD despatched BE3 ABE7
20 Korayar Bridge 30/2018 TGD despatched BE3 ABE8
21 Thennilapuram Bridge TGD despatched BE3 ABE8
22 Thorapuram 34/2018 TGD UP BE3 ABE8
23 Odannur Fair TGD putup. BE3 ABE8
24 Ezhuthampara 40/2018 TGD UP BE3 ABE8
25 Mangalam Bridge 43/2018 TGD UP BE3 ABE8
26 Chira Bridge 49/2018 TGD UP BE3 ABE8
27 Kodathur Bridge 48/2018 TGD UP BE3 ABE8
THRISSUR DISTRICT
1 KOLANGATTUKARA Bridge 12/2014 Design Completed in Aug 2014 BE3 AD1
2 KACHERIKADAVU Bridge 55/2010 Design Completed in Oct 2016 BE1 AD9
3 Bridge at AZHIKKODE-MUNAMBAM 13/2009 Revised TGD under preparation BE4 AD9
4 PERUMPUZHA BRIDGE - II 10/2011 GAD completed in Apr 2014. Awaiting AS. BE4 AD7
5 Bridge at PERUMPUZHA 09/2011 GAD completed in Aug 2014. Awaiting AS. BE4 AD3
6 SREEDHARIPALAM Bridge 16/2014Revised TGAD completed in Mar 2017. Fair GD despatched
BE4 AD7
7 KADAMTHODU Bridge 14/2014 GAD completed in Dec 2014. Awaiting AS. BE4 AD4
8 CHALAPADAM - KOOTTALA Bridge 13/2014 GAD completed in Dec 2014. Awaiting AS. BE1 AD8
9 CHAKKALAKADAVU 107/2013 GAD completed in Jan 2015. Awaiting AS. BE1 AD6
10 ARAPPA bridge 63/2014 GAD completed in Apr 2015. Awaiting AS. BE3 AD9
11 PARANOOR - KURITHICHAL Bridge 15/2014 GAD completed in Jun 2015. Awaiting AS. BE3 AD1
12 CHOTTILAPARA - VETTUKAVU Bridge 17/2014 GAD completed in Oct 2015. Awaiting AS. BE2 ABE4
13 KARIMKULAMKADAVU bridge 68/2014 GAD completed in Jan 2016. Awaiting AS. BE2 AD5
14 PULAKKATTUKARA bridge 62/2014 GAD completed in Feb 2016. Awaiting AS. BE3 AD1
15Bridge across MANALIPUZHA in PEECHI
18/2014Alignment revised as per request. Revised GD despatched
BE4 AD9
16 PUZHAKKAL 2nd bridge 29/2016 GAD completed in Dec 2016.DD UP BE3 AD9
17 PUZHAKKAL 1st bridge 30/2016 GAD completed in Dec 2016.DD UP BE3 AD9
18 KETCHERY bridge 27/2016 GAD completed in Dec 2016. Awaiting AS. BE2 AD9
19 GOTHURUTH - PULLUT Bridge 59/2014 GAD completed in Jan 2017. Awaiting AS. BE1 AD8
20 EDATHARAKAVU KADAVU bridge 61/2014Revised TGAD completed in Apr 2017. Clarification letter despatched
BE4 ABE11
21 CHOONDAL para bridge 28/2016 TGAD completed in Mar 2017.DD UP BE4 AD6
22 Parallel bridge to PULLUT BRIDGE 64/2014GD revision requested after site visit. Revised GD despatched.
BE4 AD7
23KONDAZHY - KUTHAMPULLY Bridge (Revision)
24/2011 TGD despatched.October 2017.Fair GD UP BE4 AD9
24 PALAKKADAVU Bridge 19/2014Proposal Dwg completed in Apr 2014. Awaiting feasibility report from CE(R&B)
BE1 AD9
25 CHAKKARAPADAM bridge 08/2016Proposal Dwg completed in Apr 2016. Awaiting feasibility report from CE(R&B)
BE2 AD9
Page 7
Sl. No Name of bridge ConstituencyDesign file
No.Remarks/Status DD AD
STATUS OF BRIDGE DESIGN WORKS AS ON 14-05-2018
26 UPPUMTHURUTHY bridge 56/2015Proposal Dwg. completed in Aug 2016.Awaiting feasibility report from CE(R&B)
BE3 AD9
27 Parallel bridge at KANDASAMKADAVU 09/2016 Proposal Dwg. completed in Dec 2016 BE1 AD9
28 ARANGALI KADAVU bridge 53/2015 TGD despatched. BE4 AD9
29 THRIPRAYAR Bridge 54/2017 TGD despatched. Dec 2017 BE3 AD9
30 PARAYANKADAVU Bridge 60/2017 TGD despatched. Dec 2017 BE3 AD9
31 PARAYANTHODU Bridge 3/2018 TGD despatched. BE3 AD9
32 Bridge across Canoli canal 45/2018 BE3 AD9
ERNAKULAM DISTRICT
1 NEERICODE bridge 30/2012 Design Completed on May 2013 BE2 AD5
2 KORANKADAVU Bridge 26/2011 Design Completed on Jun 2013 BE1 AD9
3 NETTOOR-KUNDANNUR Bridge 10/2012 Design Completed on Jun 2013 BE1 AD4
4 THADIKKAKADAVU Bridge Kalamasseri 04/2012 Design Completed on Aug 2013 BE4 AD5
5 KOTHAITHODU Bridge 21/2010 Design completed on Dec 2014 BE2 ABE4
6 ALUNGALKADAVU bridge 35/2012 Design completed on Jan 2016 BE1 AD8
7 VALLUVALLY-THATHAPILLY bridge 47/2012 Design completed on Apr 2016 BE1 ABE6
8 New bridge across PANAMKUTTY river 2/2010Reminder 3 dtd 11.04.14.,CS, position of bore hole, allignment plan etc missing
BE4 ABE6
9Perumbalam-Mukathurkari Ferry - Vattavayalthuruthu bridge
03/2011Work held up as per EE's letter.Work Outsourced.
BE4 ABE6
10KANNEGATTU - WILLINGTONISLAND Bridge across Kumbalom kayal
11/2012 Work outsourced BE2 AD3
11 Foot Bridge at ALUVA MANAPPURAM 25/2014 Design Tender.Work Outsourced. BE4 ABE6
8 NEDUNGAD NAYARAMBALAM 03/2002 Design completed on Nov 2016 BE4 ABE11
9 KEEZHMURIKADAVU Bridge(Rev.) 99/2013 Revised Design completed on May 2017. BE2 ABE4
10CHERANALLUR-ELOOR CHOWKA bridge
02/2016DD dwg. split up into two.2/2(a)&2/2(b). 2/2(a) completed in Mar 2017. Revised GD UP.
BE3 AD9
11 KARIPUZHA Bridge 34/2012 GAD completed in Aug 2012. Awaiting AS. BE3 AD1
12 KURUVAPALLAM bridge 36/2012 GAD completed in Aug 2012. Awaiting AS. BE2 AD9
13 KALATHILKADAVU bridge 31/2012 GAD completed in Aug 2012. Awaiting AS. BE1 AD8
14 AIYROOR bridge 56/2012 GAD completed in Dec 2012. Awaiting AS. BE3 AD2
15 EXCISEKADAVU bridge (MVPA) 54/2013 GAD completed in Dec 2013. Awaiting AS. BE4 AD1
16 KOOVALLUR bridge 30/2015 GAD completed in Sep 2015. Awaiting AS. BE1 AD4
17 KUMBALANGI Bridge (Revision) 30/2010 Revised GD despatched BE2 AD4
18KUTHIATHODU-KUNDOOR Bridge(Revision)
33/2012 Revised GD completed Aug 2017 BE4 ABE6
19 CONVENT BEACH Bridge 24/2010Design Completed in Feby 2012. Revised TGAD despatched Aug 2017
BE4 ABE11
20 MANJERIKUZHY Bridge 15/2016 DD despatched BE2 ABE6
21 RAMANCHIRA Bridge 08/2006Proposal Dwg completed in Nov 2006. Awaiting feasibility report from CE(R&B)
BE1 ABE6
22Bridge b/w POOTHOTTA & VATTAVAYALTHURUTHU
01/2011Proposal Dwg completed in Feb 2011. Awaiting feasibility report from CE(R&B)
BE3 ABE6
23 VALLIKKADA Bridge 19/2012Proposal Dwg completed in Jun 2012. Awaiting feasibility report from CE(R&B)
BE1 ABE6
24 THALIKKATUKADAVU bridge 21/2012Proposal Dwg completed in Jul 2012. Awaiting feasibility report from CE(R&B)
BE4 ABE6
25 Bridge at KETTEZHUTHU KADAVU 28/2013Proposal Dwg completed in Mar 2013. Awaiting feasibility report from CE(R&B)
BE3 ABE6
Page 8
Sl. No Name of bridge ConstituencyDesign file
No.Remarks/Status DD AD
STATUS OF BRIDGE DESIGN WORKS AS ON 14-05-2018
26 VADUTHALA - PERANDOOR Bridge 23/2014 TGD despatched. BE1 ABE6
27 ALUPURAM - KAYATHINKARA Bridge 27/2014Proposal Dwg completed in May 2014. Awaiting feasibility report from CE(R&B)
BE1 ABE6
28 PUTHUSSERITHAZHAM Bridge 32/2014Proposal Dwg completed in July 2014. Awaiting feasibility report from CE(R&B)
BE2 ABE6
29 MOOZHIKADAVU Bridge 30/2014Proposal Dwg completed in Aug 2014. Awaiting feasibility report from CE(R&B)
BE1 ABE6
30 MANGALYA KADAVU bridge 35/2015Proposal Dwg completed in Oct 2015. Awaiting feasibility report from CE(R&B)
BE3 ABE6
31Foot bridge EAST MANJANKKAD TO MANJANKKAD
38/2015Proposal Dwg completed in Nov 2015. Awaiting feasibility report from CE(R&B)
BE1 ABE6
32 MARADU-VALANTHAKADU bridge 24/2015
Awaiting reply of clarification sent to CE(R&B) in Jun 2015 regarding possibility of 2 lane bridge. Lr from EE received to give 6m vertical clearance. Clarifications sought regarding alignment and curves
BE2 ABE5
33New Bridge across Periyar river in Kalady
07/2016 TGD completed BE2 ABE6
34 THEVARA-KUMBALAM Bridge 53/2017 Revised. TGD despatched BE1 AD7
35 NAYARAMBALAM-HERBERT Bridge 49/2017Feasibility report received. Final GD under preparation.
BE2 ABE6
36Culverts and retaining walls in the new bye-pass road from Chitrappuzha-Mamala
61/2017 TGD despatched in Dec 2017 BE2 ABE5
37 CHENNAMANGALAM Bridge 67/2017 TGD despatched.. BE2 ABE6
38 Culvert across Mucheripallam thodu 28/2018 GD completed. BE2 ABE6
39 Thuthiyoor Bridge 41/2018 File received on 23/04/2018. TGD UP BE2 ABE6
40 Thevara- Chakkalakkal 42/2018 File received on 23/04/2018. TGD UP BE2 ABE6
IDUKKI DISTRICT
1 Rehabilitation of POOPARA bridge (NH) 04/2013 Design Completed in May 2013 BE4 AD9
2 KSRTC BRIDGE at Munnar(NH) 03/2013 Design Completed in Jan 2014 BE4 ABE6
3 Reconstruction of KALLAR Bridge 22/2014 Design Completed in Mar 2016 BE2 AD7
4Bridge in ANGAMVETTY MADAKKATHANAM road
38/2014 Fair DD despatched in Dec 2017 BE2 ABE4
5 CHERUTHONI bridge 55/2015Awaiting reply of clarification sent to CE(R&B) regarding possibility of 2 lane bridge.
BE4 ABE6
6
Improvements to Udumbamchola 2nd Mile Road (Mangathotty, 40 acre, Tea company,Chappath, & Deshiyam bridges)
45/2017TGD Despatched in 2017.Revision in design (Desiyam & Mangathotty)is required and is under preparation.
BE2ABE6& ABE4
7 ANAKKAYAM Bridge 48/2017 TGD Despatched BE2 ABE6
8 ELLACKAL BRIDGE 73/2017 TGD completed BE2 ABE5
9 VALLAKADAVU BRIDGE 73/2017 TGD completed BE2 ABE5
10 Parathodu Bridge 05/2018 TGD Despatched on March 2018 BE2 ABE4
11 Moolamattom - Vandiperiyar Road
a)Bridge at chainage 14/575 in Moolamattom - Vandiperiyar Road
33/2018(a) BE2 ABE6
b)Bridge at chainage 15/575 in Moolamattom - Vandiperiyar Road
33/2018(b) BE2 ABE4
c)Bridge at chainage 47/075 in Moolamattom - Vandiperiyar Road
33/2018(c) BE2 ABE4
d)Bridge at ULUPOONI in Moolamattom - Vandiperiyar Road
33/2018(d) BE2 ABE6
.File received on 19/.3/2018. TGD under preparation
Page 9
Sl. No Name of bridge ConstituencyDesign file
No.Remarks/Status DD AD
STATUS OF BRIDGE DESIGN WORKS AS ON 14-05-2018
e)Bridge at chainage 51/200 in Moolamattom - Vandiperiyar Road
33/2018(e) BE2 ABE4
f)Bridge at chainage 56/650 in Moolamattom - Vandiperiyar Road
33/2018(f) BE2 ABE6
14g)Bridge at ch:60/350 in Moolamattom - Vandiperiyar Road
33/2018(g) BE2 ABE6
KOTTAYAM DISTRICT
1 Bridge at GRAMINCHIRA 55/2012 Design Completed in Jul 2013 BE2 ABE5
2 Bridge at PARACHAL 60/2012 Design Completed in Nov 2013 BE4 AD9
3 ERATTUPETTA bridge 23/2013 Design Completed in Mar 2014 BE3 AD2
4 THARAPPEL KADAVU Bridge 15/2010 Design Completed in Apr 2014 BE4 AD6
5 COMPANYKKADAVU Bridge 03/2013 Revised TGD despatched 03/2018 BE3 ABE5
6 MUTTEDATHUKARIPALAM Bridge 20/2012 Design Completed in Nov 2014 BE2 ABE4
7MUNDAKKAYAM bypass - design of gravity retaining wall
42/2014 Stability check completed in Dec 2014 BE4 AD7
8 MUNDOLIKKADAVU Bridge 61/2013 Design Completed in Mar 2015 BE3 AD2
9Proof checking of RCC box type approach for KANJIRAM Bridge
36/2009 Proof checking Completed in Sep 2015 BE3 AD9
10 KADUTHURUTHY Bridge 62/2010 Design Completed in Jul 2016 BE3 AD2
11Bridge across THENPUZHA AT PULLAKKAYAR
18/2011 GAD completed in Jun 2012. Awaiting AS. BE3 AD2
12 Bridge at PUNNAKKAL KADAVU 61/2012 GAD completed in Apr 2013. Awaiting AS. BE1 AD9
13FLY OVER IN BYEPASS road connecting Kanjirapally town
29/2010 GAD completed in Mar 2014. Awaiting AS. BE2 AD4
14 KOKKATTUKADAVU Bridge 50/2012 GAD completed in Apr 2015. Awaiting AS. BE3 AD3
15 AKKARAPPADAM bridge (Rev) 42/2013GAD completed in Jun 2015. Revied TGD despatched
BE1 AD8
16 VALAYIL KADAVU bridge(Revision) 06/2011 Revised GAD completed in Feb 2017. BE2 AD4
17 MOOLEKADAVU Bridge 03/2005TGAD completed in May 2017.letter fr approved modified alignment sent
BE4 ABE5
18 CHERPUNKAL Bridge(revision) 28/2004 Revised GAD despatched 03/2018 BE1 ABE5
19 ANCHUMANA Bridge 16/2017. TGD despatched in 2017 BE4 ABE5
20 CHUVANNAPLAVU Bridge 27/2013 TGD despatched in 2017 BE2 ABE5
21 MOOLAKKAYAM Bridge 52/2013Proposal Dwg completed in May 2013. Awaiting feasibility report from CE(R&B)
BE1 ABE5
22CHAZHUVELATHUKARY cartable bridge
01/2015Proposal Dwg completed in Jan 2015. Awaiting feasibility report from CE(R&B)
BE1 ABE5
23 MATTATHILKADAVU Bridge 44/2014Proposal Dwg completed in Aug 2016. Awaiting feasibility report from CE(R&B)
BE2 ABE5
24 ERATHUPUZHA Bridge 24/2013
Awaiting reply of clarification sent to CE(R&B) in Mar 2013 regarding chainages of boreholes &sides of the bridges, necessity of foot path,vertical clearance etc.
BE4 ABE5
25 Ret. Wall RIVER VIEW ROAD extn. 51/2015 TGD despatched BE2 AD9
26Bridge b/w Ch. 1/290 & 1/650 of Parakkulam-Thrikkothamangalam road
46/2014Awaiting reply of clarification sent to CE(R&B) in Aug 2016 .
BE2 AD4
27 26th mile bridge 80/2017 TGD despatched 03/2018 BE2 ABE5
28Retaining wall in Kottayam Kumarakom road
32/2016 DD despatched BE2 ABE1
29 Kariyil Thodu 21/2018 TGD despatched 28/03/2018 BE2 ABE5
Page 10
Sl. No Name of bridge ConstituencyDesign file
No.Remarks/Status DD AD
STATUS OF BRIDGE DESIGN WORKS AS ON 14-05-2018
ALAPPUZHA DISTRICT
1 MADANASSERIKADAVU bridge 06/2001 Design Completed in Apr 2013 BE3 AD2
2 VAISHAMBHAGAM bridge (revision) 20/2010 Design Completed in Jan 2014 BE1 AD4
3 MUTHALA KURICHIKKAL Bridge 38/2013 Design Completed in Mar 2016 BE3 AD7
4 MUNDAKKAL bridge 22/2011 Design Completed in Aug 2016 BE2 AD3
5 MAKKEKADAVU Bridge 56/2010 Outsourced BE2 AD5
6 VALIAZHEEKAL Bridge 24/2014 Outsourced BE4 AD7
7
Retaining Wall at Parakulam-Ennasserikadavu Thirikothamangalam-Kadamuri-Chakkanchira-Toottachadu Road
File returned Aug 2014
8 AARATTUKADAVU Bridge 32/2011 GAD completed in Jul 2012. Awaiting AS. BE1 AD9
9 K.C BRIDGE upgradation 65/2012 Request for revision of GAD received BE1 AD6
10 IRANIKUDY BRIDGE 29/2014 GAD completed in Oct 2014. Awaiting AS. BE1 AD9
11KOTHARATHODU BRIDGE at Pullangadi
50/2012 GAD completed in Jan 2016. Awaiting AS. BE3 AD3
12 VAKKAYIL bridge 82/2013 GAD completed in Feb 2016. Awaiting AS. BE1 AD7
13 VAZHUVADIKADAVU bridge (rev.) 13/2006Revised TGD despatched and DD for substructure despatched
BE1 ABE3
14 KODUMTHUR-MEPPALAM bridge Harippad 39/2014 TGD despatched on Aug 2017 BE4 AD8
15 KAVAALAM-THATTASSERY Bridge Kuttanad 11/2014 Revised TGD despatched BE1 ABE3
16 PADAHARAM bridge 33/2016 Revised TGD despatched BE4 ABE3
17 KAIPALAKKADAVU bridge 24/2011Final GAD despatched and DD for substructure despatched on April 2018
BE1 AD9
18 PUNNAMADA Bridge 17/2011 TGAD completed in Mar 2017. BE1 AD8
19 KOMMADY Bridge 07/2017 Revised TGD despatched BE1 AD9
20 POWER HOUSE Bridge 06/2017 Revised TGD despatched BE1 AD8
21 KORAMKUZHI Bridge 19/2011 Revised TGD despatched BE1 AD8
19Pathiyoor and Cheriya pathiyoor Bridge
24/2017 TGAD completed in Jun 2017. BE1 AD8
20 Madathilkadavu Bridge Chennithala 35/2017 Revised TGD despached BE1 ABE3
21 PALLATHURUTHY out post Bridge 34/2017 TGD despatched BE1 AD8
22 P. S. KADAVU Bridge 09/2006Proposal Dwg completed in Mar 2007. Awaiting feasibility report from CE(R&B)
BE3 AD8
23Cartable bridge across OLAVAIPU KAYAL
57/2014Proposal Dwg completed in Feb 2015. Awaiting feasibility report from CE(R&B)
BE2 AD8
24 AYYAPARAMBU Bridge Harippad 44/2015Proposal Dwg completed in Jan 2016. Awaiting feasibility report from CE(R&B)
BE1 AD8
25KAINAKARY PANCHAYATHU KADAVU Bridge
06/2016Proposal Dwg completed in Jul 2016. Awaiting feasibility report from CE(R&B)
BE2 AD8
26ROB at Level cross No 43A/E2 across KANICHUKULANGARA Beach Road
04/2014Awaiting reply of clarification sent to CE(R&B) in Jan 2014 regarding GAD of railway portion
BE3 AD2
27Cartable bridge across PANAVALLY KAYAL IN ANJUTHURUTHU
41/2014Awaiting reply of clarification sent to CE(R&B) in Jul 2014
BE2 AD5
28KRISHNAPURAM VADAKKAN VELIYANAD bridge
07/2015Awaiting reply of clarification sent to CE(R&B) in Mar 2015 regarding foundation recommendation
BE1 AD8
29 Muttel Bridge 01/2017 TGD despatched BE3 ABE3
30 Widening of GILLA Court Bridge 05/2017 TGD despatched BE4 ABE3
31 Naluchira Bridge 43/2017 TGD despatched BE1 ABE3
32 THYCHERYTHODU Bridge 47/2017 TGD despatched BE1 ABE3
33 NEDUMBARAKADU Bridge 50/2017 TGD despatched BE1 ABE3
Page 11
Sl. No Name of bridge ConstituencyDesign file
No.Remarks/Status DD AD
STATUS OF BRIDGE DESIGN WORKS AS ON 14-05-2018
34 PARK Bridge 78/2017 TGD despatched BE1 ABE3
35 MARKET Bridge 76/2017 TGD despatched BE1 ABE3
36 KOYIKKALPADI Bridge 77/2017 TGD despatched BE1 ABE3
37 KANNISAKADAVU Bridge 83/2017 TGD despatched BE1 ABE3
38 NEDUMUDI CULVERT 01/2018 TGD despatched BE1 ABE3
39 MUTTAR Bridge 25/2018 TGD despatched BE1 ABE3
40 Mukkoduthodu Bridge 29/2018 TGD putup BE1 ABE3
41 Muttel bridge(kayamkulam) 37/2018 TGD despatched BE1 ABE3
PATHANAMTHITTA DISTRICT
1 Bridge at KANAMALA 16/2009 Design Completed in Apr 2013 BE3 AD5
2 ANJILIMOOTTILKADAVU Bridge 48/2012 Design Completed in Feb 2016 BE4 AD5
3 Vadasserikkara Foot overbridge 17/2010 GAD completed in May 2012. Awaiting AS. BE1 AD1
4 VAYARAPPUZHA KADAVU Bridge 39/2009 Revised TGD Despatched. BE2 ABE6
5 NEW KOZHENCHERY bridge 35/2014 GAD completed in Apr 2015. Awaiting AS. BE4 AD7
6 VADASSERIKKARA bridge 20/2016 GAD completed in Dec 2016. Awaiting AS. BE1 AD8
7 Bridge at Pandalam by-pass road 09/2017 TGD completed in Mar 2017 BE3 AD1
8 PARAKADAVU bridge 12/2016 TGD completed in Feb 2017 BE1 AD8
9 MUTHOOR-KUTHUR Bridge 11/2017 TGD completed in Mar 2017. BE2 AD4
10 RANNI VALIYA Bridge 08/2017 TGD completed in Mar 2017 BE4 ABE3
11 KAVUM BHAGAM IDINJILLAM Bridge 12/2017 TGD (REVISION) despatched 03/2018 BE2 ABE4
12 ADOOR TOWN Bridge 13/2017 TGD completed in Mar 2017.DD UP BE2 ABE4
13 CONCORD Bridge 52/2015 Feasibility received. Final GAD putup. BE2 ABE5
14Single lane bridge at Varambinakathu Malikadavu
35/2016 Proposal despatched BE2 ABE4
15 UPADESIKADAVU Bridge 34/2016 Proposal under preparation BE2 ABE6
16Kottappuram Bridge across KIP Canal in Adoor - Anandapally Road
2018/18 TGD despatched on 03/2018 BE2 ABE4
17 KISUMAM Bridge Ranni 32/2018 Insufficient details . Letter despatched BE2 ABE4
KOLLAM DISTRICT
1 KOORYKKUZHY bridge Kunnathur 16/2012 Design Completed in Jul 2013 BE4 AD6
2 EZHAVAPPALAM Bridge Kollam 46/2013 Design Completed in Nov 2013 BE4 AD7
3 Bridge at PALLIKKAMANNADI Chattannur 39/2010Design Completed in Mar 2014. Revision of TGD to be taken up.
BE3 ABE2
4 PALLIMON Bridge Kundara 44/2013 Design Completed in Mar 2014 BE2 AD6
5 Reconstruction of KANDANCHIRA CHEEP Bridge
Kollam 69/2012 Design Completed in May 2014 BE2 AD2
6Bridge connecting ISLANDS IN SAKTHIKULANGARA
51/2010 LA issues -- dropped. Current status asked BE3 AD3
7 Bridge at MARAKKULAMKADAVU Chatthannur 01/2013Awaiting reply of clarification sent to CE(R&B) in Dec 2012 - Work outsourced
BE1 AD8
8 PARAPPAYAM Bridge (Rev) 9/2005 Design Completed in Jun 2015 BE1 AD1
9PADAPPAKARA-KUTHIRAMUNAMPU-MANAKKADAVU bridge
Kundara/Kunnathur
64/2012 GAD completed in Jun 2014. Awaiting AS. BE4 AD4
10 KALCHIRAPPALLY Bridge Kottarakkara 59/2010 GAD completed in Jun 2011. Awaiting AS. BE4 ABE11
11 KOZHIPPALAM Bridge Punalur 66/2013 TGD Completed. BE3 ABE2
12 KANNANKADU Bridge Kunnathur 75/2013 TGD despatched BE4 ABE2
Page 12
Sl. No Name of bridge ConstituencyDesign file
No.Remarks/Status DD AD
STATUS OF BRIDGE DESIGN WORKS AS ON 14-05-2018
13 ARAKKADAVU Bridge Kottarakkara 74/2013 DD despatched(substructure). BE2 ABE3
14 KONNAYIL KADAVU Bridge(Revision) Kunnathur 57/2010 Revised GAD completed in Feb 2017. BE4 ABE5
15CHETTIYARAZHIKATHU KADAVU bridge (Rev)
Kottarakkara 39/2013GAD completed in Jul 2013. Revised TGAD completed in Jun 2017.
BE1 AD8
16 KAKKATTUKADAVU Bridge Kunnathur 77/2013Proposal Dwg completed in Sep 2013. Awaiting feasibility report from CE(R&B)
BE1 AD8
17 CHELONGOTTU KULANGARA BridgeKunnathur/Kar
unagappally73/2013
Proposal Dwg completed in Jul 2013. Awaiting feasibility report from CE(R&B)
BE2 AD3
18 Bridge at ARULAPPANTHURUTHU Chavara 47/2014 TGD despatched. BE2 AD4
19 KACHIKADAVU bridge Eravipuram 37/2014Proposal Dwg completed in Oct 2014. Awaiting feasibility report from CE(R&B)
BE3 AD9
20 Extension of ASRAMAM LINK ROAD Kollam 07/2014Proposal Dwg completed in Jan 2016. Awaiting feasibility report from CE(R&B)
BE4 AD1
21 ELAVOOR bridge Kundara 49/2015 TGD putup BE2 AD3
22 CHITTUMOOLA ROB 04/2016Awaiting reply of clarification sent to CE(R&B) reg railway consent,approved alignment,in Jan 2016
BE1 AD8
23 Construction of gabbion wall - NH744 18/2016Poof checking of the design completed in Sep 2016
BE4 ABE3
24Extension of Asramam link road - Phase 4 extension upto Thoppilkadavu
Kollam 23/2016Authenticated details not received, Clarification reg consent from IWA, approved alignment plan etc
BE1 ABE3
25 Fathima island Mukkathukadavu bridge 30/2017 TGD Despatched BE1 ABE3
26 PERUMON MANROETHURUTHU bridge 33/2017 Revised TGD Despatched BE1 ABE3
27 PONMANA bridge 32/2017 Clarification reg height of bridge sought. BE1 ABE2
28 Vettiyathode bridge 11/2008 TGD despatched on Oct 2017 BE1 ABE1
29 Kazhuthuruthi bridge 79/2017 Proof checking letter despatched BE1
30Extension of Asramam link road - Phase 3
81/2017 Proof checking letter despatched BE1 ABE3
31 Rehabilitation of Ayoor Bridge 6/2018 Rehabiltation Scheme despached BE1 ABE3
32 Sree Sastha Amalakadavu Bridge 20/2018 TGD despatched BE1 ABE3
THIRUVANANTHAPURAM DIST.
1Bridge at KEEZHAPALOOR PARANDODE - MEENANKAL road
Aruvikkara 43/2013 Design Completed in Apr 2013 BE1 AD7
2 Bridge at PANNIKKUZHI Aruvikkara 34/2013 Design Completed in May 2013 BE2 AD1
3 10TH MILE STONE Bridge at Karakulam. Nedumangadu 41/2010 Design Completed in Jun 2013 BE3 AD9
4 KEEZHAROORKADAVU bridge Kattakada 32/2012 Design Completed in Nov 2013 BE3 AD6
5 Bridge at ANIYILAKADAVU 5/2011 Design Completed in Feb 2014 BE1 AD8
6 Reconstruction of MOOLAYAM bridge Nedumangadu 7/2013 Design Completed in Feb 2014 BE3 AD2
7Reconstruction of PUTHUKURICHY Bridge
58/2013 Revised TGD despatched. BE1 AD7
9 Reconstruction of PONNARA bridge 09/2013 Design Completed in Mar 2014 BE1 AD6
10 KOOVAKKUDI Bridge Aruvikkara 45/2013 Design Completed in Mar 2014 BE3 AD3
11 ROB at KAZHAKKUTTOM Kazhakkuttom 15/2009 Design Completed in May 2014 BE4 AD5
12 KANNIPURAM bridge Neyyattinkara 33/2013 Revised TGAD completed in Mar 2017. BE4 ABE2
14 PONGUMOODU- PUNNAVOOR bridge Nemam 12/2011 Design Completed in Aug 2014 BE2 AD4
15 VENKODE bridge Parassala 05/2013 GD Despatched in Dec2017 BE1 ABE1
Page 13
Sl. No Name of bridge ConstituencyDesign file
No.Remarks/Status DD AD
STATUS OF BRIDGE DESIGN WORKS AS ON 14-05-2018
16 PANCHIKKATTUKADAVU bridge Neyyattinkara 06/2013 Design Completed in Dec 2014 BE2 AD4
17 MULLARAVILA Bridge Neyyattinkara 38/2004 Revised TGD despatched. BE1 ABE1
18 Ret Wall in NETTICHIRA-VELLANAD road
01/2016 Proof checking completed in Feb 2016 BE1 AD4
19Construction of compound wall, RCC wall etc. at Mannanthala Govt. Press
22/2016 Design Completed in Oct 2016 BE2 ABE4
20 NEYYAR bridge Parassala 70/2013 Design Completed in May 2016 BE4 AD7
21 Bridge at PARUTHOOR 62/2013 Design Completed in Jul 2016 BE2 AD1
22 MYLOTTUMOOZHY bridge Aruvikkara 72/2013 Design Completed in May 2016 BE1 AD4
23 PONNAM CHUNDU bridge Aruvikkara 32/2013 DD completed in Jul 2016. BE4 AD6
24 ROB at CHIRAYINKEEZHU
Chirayinkeezh 52/2010 GAD completed in Dec 2010. Awaiting AS. BE2 AD6
25 MOOTHALA bridge 18/2013 GAD completed in Mar 2013. Awaiting AS. BE1 AD6
26 THIRUVALLAM PANATHURA bridge 30/2013 GAD completed in Mar 2013. Awaiting AS. BE2 AD1
27 New bridge near MADHUPALAM 37/2013 GAD completed in Apr 2013. Awaiting AS. BE4 AD7
28 VALIKODE bridge Nedumangadu 52/2012 TGD Despatched in Jan 2018 BE1 ABE1
29 CHANGADAKADAVU bridge Parassala 29/2012 GAD completed in Jul 2013. Awaiting AS. BE1 AD7
30 KATTUMURACKAL bridge 67/2013 GAD completed in Jul 2013. Awaiting AS. BE4 AD1
31Bridge at CHETTACHAL SOORYAKANTHI
Aruvikkara 49/2013 GAD completed in Aug 2013. Awaiting AS. BE2 AD1
32 Bridge at THOTTATHINKADAVU Aruvikkara 47/2013 GAD completed in Aug 2013. Awaiting AS. BE3 AD2
33 PLAMPAZHINJI bridge Parassala 103/2013 TGD despatched. BE1 ABE1
Page 14
Sl. No Name of bridge ConstituencyDesign file
No.Remarks/Status DD AD
STATUS OF BRIDGE DESIGN WORKS AS ON 14-05-2018
34 PUTHENTHOPPU bridge 10/2014 GAD completed in Dec 2014. Awaiting AS. BE4 AD2
35 Bridge at MUDAVANMUGHAL 51/2013 GAD completed in Jul 2015. Awaiting AS. BE1 AD6
36 CHITTAR Bridge 03/2015 GAD completed in Oct 2015. Awaiting AS. BE2 AD4
37 MANGOTTUMOOLA PERAKAM bridge 54/2015 TGAD completed in Dec 2015. Awaiting AS. BE2 AD9
38Construction of Retaining wall at Pulayanarkotta old age home.
42/2016 Design completed Mar 2017. BE3 AD1
39 Bridge at ARUVIKKARA-CHANICHALKADAVU
Aruvikkara 35/2013 GD up BE1 ABE1
40 KUDUVEETTIL KADAVU bridge Parassala 21/2016 GAD completed in Oct 2016. Awaiting AS. BE4 AD7
41CHERKKRAM bridge at Nagaroor-Karette road
46/2015 Fair TGD put up BE3 ABE8
42 Improvements of Palode -Brimore road 21/2017 DD despatched on April 18 BE2 AD6
43 MURINJA PALAM Bridge(Rev) 13/2011 GD Despatched BE1 ABE1
44Bridge at Amaravila-Ottasekharamangalam road
19/2017DD despatched and revised GD and DD for footbridge putup
BE1 ABE3
45 Bridge across THETTIYARTHODU 39/2012 GAD under preparation BE1 AD9
46 KUMBICHAL KADAVU Bridge Parassala 15/2017 GD despatched in July 2017 BE4 AD6
47 KALLADI MUKHAM Bridge 04/2005 TGD despatched. BE3 AD1
48 Cherukayalkara Bridge 20/2017 GD & DD despatched in Dec 2017 BE2 AD4
49KIIFB- Four laning at Vazhayila-
Pazhakutty-Kacherinada- 11 th stone26/2017 TGD despatched. BE4 AD7
50 Bridge at THENNOOR Vamanapuram 2/2012Proposal Dwg completed in Feb 2012. Awaiting feasibility report from CE(R&B)
BE1 ABE1
51 MEENMOODU Bridge Vamanapuram 96/2013 TGD Despatched BE1 ABE1
52Bridge at CHERUPALODE-MENAMCODE VAZHAYILA Vattiyurkavu
41/2015Proposal Dwg completed in Oct 2015. Awaiting feasibility report from CE(R&B)
BE2 ABE1
53 NAGAROOR bridge 33/2015Proposal Dwg completed in Nov 2015. Awaiting feasibility report from CE(R&B)
BE1 ABE1
54Bidge at KOCHUPALAM in Kilimanoor-Attingal road
40/2015Proposal Dwg completed in Dec 2015. Awaiting feasibility report from CE(R&B)
BE1 ABE1
55 New bridge in THIRUVALLAM EDAYAR 25/2015Proposal Dwg completed in Jan 2016. Awaiting feasibility report from CE(R&B)
BE1 ABE1
56Bridge b/w BEEMAPALLY-PARUTHIKUZHI (NH bypass)
Thiruvananthapuram
14/2009Awaiting reply of clarification sent to CE(R&B) in Apr 2009 regarding Design detais, allignment plan, etc.
BE2 ABE1
57 Bridge over KADINAMKULAM KAYAL 09/2010Awaiting reply of clarification sent to CE(R&B) in Apr 2010 regarding bore holes.
BE3 ABE1
58 POZHIYOOR Foot Bridge 34/2011Awaiting reply of clarification sent to CE(R&B) in Jan 2012.
BE4 AD1
59 ROB at CITY ROAD, Karamana 12/2013Awaiting reply of clarification sent to CE(R&B) in Feb 2013 regarding alignment plan, Borehole, chainages.
BE1 ABE1
60 KALLUPALAM bridge Kattakada 98/2013 TGD despatched in March 2018 BE1 ABE1
61 KEEZHARANOOR Bridge 19/2016Awaiting reply of clarification sent to CE(R&B) in Jul 2016 regarding foot path.
BE3 ABE1
62VISL-Vizhinjam international terminal bridge on 2Km connectivity road
07/2011 No Action BE2 ABE1
63 Re-construction of Attipara Bridge 39/2012 Awaiting Feasibility report. ABE1
64 Retaining wall at Adupukuttanpara 39/2017 Tentative GD despatched in Oct 2017 BE1 ABE1
65Flyover between Karakulam Jn & Keltron Jn
Nedumangad 40/2017 GD despatched in Sept 2017 BE1 AD7
66Retaining wall at Medical College Pangappara
51/2017 TGD despatched in Dec 2017 BE1 AD7
Page 15
Sl. No Name of bridge ConstituencyDesign file
No.Remarks/Status DD AD
STATUS OF BRIDGE DESIGN WORKS AS ON 14-05-2018
67 Retaining wall at Govt. M.C Hostel 63/2017 DD despatched in Dec 2017 BE1 AD7
68Proof Checking of Mangottukadavu Steel Bridge
GL/2017 Comments despatched BE3 AD9
69 Pallathukadavu Bridge 05/2012 Revision request received,UP BE1 ABE1
70 Anappadu Bridge 95/2013 TGDdespatched in March 18 BE1 ABE1
71 Kulashekharam Bridge 20/2005 TGD Despatched in Jan 2018 BE1 ABE1
72 Vallakkadavu Bridge 8/2000 New alignment received. UP BE1 ABE1
73RICK-SRIP KARAMANA-VELLARADA ROAD IPRMNT
64/2017Clariffication letter Despatched on Nov 2017.Design completed(TGD)
BE1 ABE1
74 KALLIKKADU BRIDGE 16/2018 TGD despatched BE1 ABE1
75 VENJARAMOODU BYPASS 17/2018 TGD UP BE1 ABE1
76PAZHAKUTTY MANGALAPURAM ROAD
19/2018 TGD UP BE1 ABE1
77Improvements to TVM-Neyyar dam road(3 bridges)
39/2018 TGD UP BE1 ABE1
78NH 47 Fouur laning. Phase I -Reach II Karamana-kaliyikkavila(pallichal)(2
44/2018 TGD UP BE1 ABE1
79Improvements to Killy-EMS Academy(2 bridges)
47/2018 Reconstruction not required BE1 ABE1
AD1 AD9(Addl. Charge) BE1
AD2 Smt. Helena BE2 Sri. Suju P S
AD3 AD2 (addl. charge) BE3
ABE4 Smt.Silpa C Sreedharan BE4
ABE5 Smt. Lekshmi P V
ABE6 Smt. Suma R Nair
AD7 Sri. Arun K V
AD8 Sri. Sujith P R TGAD
AD9 Sri. Sony J S D GAD
ABE8 Sri. Kannan P DD
ABE1 Sri. Deepak P S UP
ABE11 Sri Remil K
ABE10 Sri Arun K S
Assistant Directors Deputy Directors
Smt. Anithakumari K
Smt. Divya J Satheesh
-Sd/- Saju S.
Joint Director
Asst. Engineers or Asst. Executive Enginees of the concerned work shall call the concerned Assistant Director (AD) / Deputy Director (DD) listed below through Landline No.: 0471-2322029 or email to [email protected] for
clarifications or suggestions, if any, regarding the design of the above bridge works.
Smt. Phoenix S S
Tentative General Arrangement Drawing
General Arrangement Drawing
Detailed Design Drawing
Under preparation
Page 16