5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
1/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
This is the html version of the file http://elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21&22.4.12.pdf.Google automatically generates html versions of documents as we crawl the web.
Page 1
I N D E X
Sno Item Page
no.
1.0 ELECTRIC (LOCO)
1.1 Punctuality performance 4
1.1.1 Reliability of electric locos 4
1.1.2 Incidences of Electric Loco failures affecting punctuality on ownership basis 5
1.1.3 Type-wise loco FRPCPM 6
1.1.4 Analysis of operational failures 6
1.1.4.1. Detailed analysis of operational failures 7
1.1.5 Formation of Joint Procedure Order (JPO) 7
1.1.6 Equipment having rising trend of line failures 8
1.1.7 Safety - Accident cases on Electrical account 9
1.1.8 Provision of Vigilance Control Device 9
1.2 Review of important ongoing works 11
1.3 Items sanctioned in Budget 2012-13 19
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
2/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
1
1.4 Three phase electric locos 192.0 ELECTRICAL (G)
2.1 Punctuality performance 23
2.2 Progress of important sanctioned works. 23
3.0 RAILWAY ELECTRIFICATION
3.1 Distribution of Sanctioned Electrification Works in 2012-13 26
3.2 Electrification during 2011-12 26
3.3 TRD Post Creation 28
3.4 Progress of RE works for Jammu Tawi-Ludhiana, MB-LKO-MGS 29
3.5 Important Stores tenders/ Works Tender Position. 30
3.6 Position of Gazetted / Non Gazetted Cadre in CORE 30
3.7 Work Charged Posts from CORE to Zonal Railway 31
3.8 Other Items 31
4.0 ELECTRICAL ENERGY MANAGEMENT
4.1 Reliability improvement measures 36
4.2 Review of important ongoing works 36
4.3 New works sanctioned 37
4.4 Creation of Gazetted & Non-gazetted posts 38
4.5 Items for discussion 38
5.0 ELECTRICAL (DEV.)
5.1 Electric Locomotive Factory at Madhepura 40
5.2 Setting up of electric loco assembly & ancillary unit for CLW 40
5.3 Setting up of the factory for manufacture of IGBT based propulsion
equipment for electric locomotives at Shyamnagar in West Bengal
40
5.4 Setting up of electric loco maintenance depot for 9000 HP electric locos at
Rewari
40
ANNEXURES 42-65
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
3/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
Page 2
AGENDA
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
4/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
2
Page 3
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
5/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
Elect.(Loco)
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
6/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
3
Page 4Agenda for CEE’s performance Review meeting on 20th & 21st April 2012
Railway Board, New Delhi
1.0 Elect. Loco
1.1 Punctuality performance
The complete data of punctuality loss cases on Electric loco account in MS-EXCEL
spread sheet has been made available on website link http://elocos.railnet.gov.in/
or 10.50.88.50.
1.1.1 Reliability of electric locos
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
7/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
There have been 2106 incidences of electric loco failure which have led to
punctuality loss of 3388 M/E trains during 2011-12 as compared to 1987 incidences
leading to punctuality loss of 3285 M/E trains during 2010-11 indicating
deterioration of (-) 6.0% in incidences and 3.1% in no. of trains loosing punctuality.
Railway wise comparative status of no. of Mail express trains loss punctuality on
electric loco account on territorial basis is as under:
Territorial Rly 2010-11 2011-12 % Imp. (+)/ Det. (-)
CR 229 236 (-) 3.1
ER 196 232 (-) 18.4
ECR 534 632 (-) 18.4
ECoR 148 167 (-) 12.8
NR 215 182 (+) 15.3
NCR 1025 914 (+) 10.8
NER 3 8 (-) 166.7
SR 123 134 (-) 8.9
SCR 78 121 (-) 55.1
SER 203 189 (+) 6.9
SECR 214 224 (-) 4.7
SWR 17 13 (+) 23.5
WR 163 123 (+) 24.5
WCR 137 213 (-) 55.5
Total 3285 3388 (-) 3.1
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
8/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
4
Page 5
1.1.2 Incidences of Electric Loco failures affecting punctuality on ownership basis
Shed-wise comparative performance of punctuality loss incidences (Excluding operational failures)
(Apr-Mar’2011/12)
Rly. ShedNo. of Failures FRPCPM % imp/Det.
Equipment needing attention2010-11 2011-12 2010-11 2011-12 Failures FRPCPM
CR
KYN 20 24 1.1 1.3 -20.0 -12.4 Cables (4), TM (3), SMGR(3), SIV (3),
AQ 41 42 2.2 2.1 -2.4 7.8 3-Phase (37), Roof Eq. (2)
BSL 32 35 1.7 1.8 -9.4 -5.9EM/EP (4), HL/FL (3), VCD (3), SIV (3), TFP (2), TM
(2), GR (2),
ER
ASN 41 28 2.7 1.8 31.7 32.8 TM (4), MPFDCS (4), Relay (3), Pn. Valve (3),
HWH 83 130 7.6 11.4 -56.6 -50.0
3-Phase (6), Pn. Pipeline/Valve (15), TM (9), Aux
(8), EM/EPC (8), Relay (8),SIV (7), CTRL (7), Roof
Eq. (5), MPFDCS (5),
ECR
GMO 79 68 4.3 3.5 13.9 18.7 3-Phase (49), RSI block (3),
MGS 162 123 8.9 6.3 24.1 29.6
Pn. Pipeline/valve (15), Cable (10), Aux (10), TM
(8), CTRL (9), Relay (9), EM/EPC (7), MPFDCS (6),
Bogie (5) Switch (5), RSI Block (4), VCB (4),
ECoRANGL 34 38 3.5 3.2 -11.8 8.4
RSI Block (9), SIV (4), TM (3), Aux (3), CTRL (3),
EMC (3), Relay (3)
WAT 13 12 0.6 0.6 7.7 0.0 Pn pipeline/valve (4), Relay (2)
3-Phase (202), TM (16), Aux (11), CTRL (10), SIV
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
9/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
5
NRGZB 274 340 13.9 16.0 -24.1 -15.0 (9), Pn, Pipeline/valve (9), Cable (6), Bogie (6), EPC
(5), TFP (4), SMGR (4),
LDH 51 45 3.1 2.6 11.8 16.1 TM (5), TFP (5), MPFDCS (5), Aux (4), VCB (4)
NCRCNB 74 75 3.5 3.4 -1.4 2.0 SIV (12), Pn. Pipeline/Valve (12), EPC (6)
JHS 34 36 1.6 1.6 -5.9 -1.3 Relay (10), Pn pipeline/valve (6)
SR
AJJ 36 31 2.4 2.0 13.9 17.9 Pn. Pipeline/Valve (7),
ED 42 38 2.3 1.9 9.5 16.2 CTRL (6), Aux (3)
RPM 37 35 6.2 4.7 5.4 23.7 TM (7), MPFDCS (4)
SCR
BZA 24 24 1.2 1.1 0.0 8.0 Cable (5), RSI block (3)
KZJ 9 15 0.7 1.1 -66.7 -63.7 TM (2), SIV (2)
LGD 75 77 3.8 3.8 -2.7 0.03-Phase (45), TM (4), Pn. Pipeline/Valve (3), TFP
(3)
SER
BNDM 19 9 0.9 0.4 52.6 54.6 Pn. Pipeline/Valve (4),
TATA +
BKSC47 34 2.2 1.6 27.7 27.3 TM (6), SMGR (4), Pn. Pipeline/Valve (3)
SRC 46 57 7.2 7.3 -23.9 0.0 TM (7), ), Pn. Pipeline (5), MPFDCS (4), TFP (4),
SECR BIA 29 54 1.5 2.6 -86.2 -68.13-Phase (6), Pn, Pipeline/Valve (4), SIV (4),
MPFDCS (4),
WRBL 23 19 1.7 1.4 17.4 19.6 Cable (3), Pn. Pipeline/Valve (3)
BRC 53 27 2.6 1.3 49.1 49.7 3-Phase (2), SIV (3), CTRL (3),
WCR
ET 60 58 3.2 2.8 3.3 11.3Aux (8), Pn. Pipeline/Valve (6), CTRL (6), MPFDCS
(5),
NKJ 21 26 1.3 1.5 -23.8 -18.5 TM (3), SIV (3)
TKD 53 46 2.8 2.2 13.2 21.6 3-Phase (22), SIV (6), TM (5),
IR TTL 1512 1546 3.2 3.1 -2.2 3.7
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
10/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
Page 6
1.1.3 Type-wise loco FRPCPM [{(Total failures/12)/Avg. Holding}X100] for all Railways for the year
2010-11/ 2011-12 is as under:
Rly WAM4 WAP1 WAP4 WAP5 WAP7 WAG5 WAG6 WAG7 WAG9WCAM1/
WCAM3
WCAM2/
WCAG1Over All
CRA 2.2 3.2 17.6 0.8 1.0 3.2 2.8 0.0 1.8
B 3.7 4.9 0.3 2.5 0.7 1.8
ERA 8.9 8.2 1.4 5.1 4.8
B 9.6 11.2 33.3 1.1 1.1 5.9
ECRA 11.5 14.9 5.2 3.3 5.8 6.6
B 8.1 12.1 4.3 2.0 4.7 4.9
ECoRA 3.7 0.1 0.6 2.9 1.6
B 3.2 0.1 2.7 1.5
NRA 7.5 15.3 14.9 16.9 3.0 9.0
B 9.0 17.6 16.3 18.5 2.4 10.1
NCRA 6.0 1.2 2.5 2.5
B 7.1 0.9 2.5 2.5
SRA 3.6 4.9 4.0 1.6 2.8
B 3.3 4.3 3.7 0.4 2.4
SCRA 2.9 4.0 11.2 0.5 0.8 2.8 2.0
B 1.0 4.3 8.4 0.4 1.5 2.4 2.1
SERA 5.4 7.4 0.6 0.9 3.8 2.2
B 3.3 7.3 1.2 0.5 1.9
SECRA 4.6 0.9 0.3 4.4 1.7
B 6.8 2.0 1.4 2.5 2.6
WRA 3.3 5.6 0.7 2.1 1.7 2.2
B 0.8 2.6 20.0 0.6 1.6 2.1 1.4
WCRA 2.8 8.7 0.9 2.5 8.9 2.6
B 2.7 6.3 0.9 2.6 5.4 2.2
A 4.6 6.5 7.2 14.9 14.5 0.8 0.6 2.0 4.5 2.4 1.7 3.2
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
11/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
6
IR B 4.0 7.2 7.4 16.4 14.2 0.8 0.0 1.6 3.3 2.1 2.4 3.1
A-2010-11 B- 2011-12
• There is deterioration of performance of WAP5 locos. FRPCPM increased from 14.9 to 16.4
• Deterioration of performance of WAP4 locos FRPCPM increased from 7.2 to 7.4 for IR.
i.e. Contribution of ER- (8.2 to 11.2), NR- (15.3 to 17.6) & NCR- (6.0 to 7.1).
• Performance of WAP7 has deteriorated from 16.9 to 18.5 in NR.
1.1.4 Analysis of operational failures
During 2010-11 there were 635 cases out of total 1987 cases (i.e. 31.96%) because of
various factors not concerning to maintenance of electric locos.
During 2011-12 there are 734 such cases out of total 2106 cases (i.e. 34.85%).
Page 7
These failures can be summarized in three groups as under:
Groups 2010-11 2011-12 % (+) Imp/
(-) Det.
Crew and management failures 250 307 (-) 22.8
Wrong Booking by traffic 255 322 (-) 26.3
Stalling (Under powering) 130 105 (+) 19.2
Total 635 734
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
12/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
1.1.4.1. Detailed analysis of these failures is as under:
Rly Crew
Poor TS,
STA/Crew,
MMG/TLC
Wrongly Logged
Stalling
(Under
Powering)
Total
2010-11 2011-12 2010-11 2011-12 2010-11 2011-12 2010-11 2011-12
CR 36 26 14 11 9 6 59 43
ER 20 26 26 22 8 4 54 52
ECR 53 76 48 104 8 10 109 190
ECoR 13 15 8 19 35 20 56 54
NR 10 11 12 8 1 0 23 19
NCR 40 52 66 62 12 6 118 120
NER 1 3 0 2 0 0 1 5
SR 5 8 11 8 1 0 17 16
SCR 5 4 2 10 1 3 8 17
SER 20 26 24 22 6 7 50 55
SECR 25 28 25 25 36 28 86 81
SWR 5 4 1 0 0 0 6 4
WR 11 9 9 11 11 4 31 24
WCR 6 19 9 18 2 17 17 54
Total 250 307 255 322 130 105 635 734
• Failures on account of crew i.e. poor trouble shooting, indiscipline, failure of
Controllers and other operational staff on rise.• Wrongly logged cases problem is increasing in ECR, ECoR & WCR
1.1.5 Formation of Joint Procedure Order (JPO) for goods train working on graded / stalling prone
areas needs to be done on priority and it should be incorporated in the divisions working
time tables, which are under preparation.
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
13/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
7
Present status of the JPO and its inclusion in WTT of all ZRlys is as under.
Rly. JPO WTT Remarks
CR Incomplete
Not signed by traffic
No reference to
stalling
JPO to be made & to be
included in WTT
Page 8
Rly. JPO WTT Remarks
ER Available for ASN
division
-do- Only ASN division has
stalling prone areas
ECR Available for DHN
division
Load table given Only DHN division has
stalling prone areas
ECoR Available for all
divisions (2005)
Load table given JPO to be revised for
load table given in WTT
including WAG9 locos.
NR DLI Division initiated
for JPO (28.02.2012)
No reference to
stalling
JPO to be made & to be
included in WTT
NCR Not issued Load table given JPO to be made & to be
included in WTT
SR Not issued Load table given JPO to be made & to be
included in WTT
SCR Available for all
divisions (2012)
Load table given -
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
14/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
8
SER Available for all
divisions (2004)
No reference to
stalling
JPO to be revised and
table given in WTT
SECR Available for all
divisions (2010)
Load table given JPO to be revised for
load table given in WTT
including WAG9 locos.
WR Not issued Load table given JPO to be made & to be
included in WTT
WCR Not issued Load table given JPO to be made & to be
included in WTT
• ER, ECR & SCR have taken adequate steps for making JPO/WTT.
• Other Railways also to take action as indicated above.
1.1.6 Equipment having rising trend of line failures are as under:
Equipment Total Incidences
(Apr-Mar)
2010-11 2011-12
Traction Motor 94 108
MPFDCS 36 49
EM contactor 32 42
Transformer 31 35
RSI Block 15 32
GR/RGR 24 27
Roof Equipments 8 23
RTPR/HL/FL 7 13
VCD 5 13
3-Phase 301 369
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
15/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
Page 9
1.1.7 Safety - Accident cases on Electrical account (since 01.01.2009 till 17.04.2012)
Classification NCR ER NR WR CR ECoR SER ECR Metro SCR SECR WCR SR Total
SPAD 7 3 1 3 4 1 4 2 2 1 1 29
Collision 1 1 2 1 1 2 1 1 10
Derailment 2 4 2 8
Maintenance 1* 1$ 1** 1*** 4
11 5 5 5 4 4 4 3 3 2 2 2 1 51
* Failure of ELS/NKJ loco ** Failure of ELS/GMO loco ***Rolling stock Maintenance $ TrD Failure
Year NCR ER NR WR CR ECoR SER ECR Metro SCR SECR WCR SR Total
2009-10 4 3 2 10
2010-11 3 1 1 1 1 1 4 3 2 1 1 19
2011-12 4 4 1 1 3 3 1 1 1 2 1 21
2012-13 1 1
Total 11 5 5 5 4 4 4 3 3 2 2 2 1 51
There are 51 incidences of accidents/derailment since 01.01.2009 occurred on account of
Electric traction Maintenance & Operation. Out of 51 cases, 47 cases have taken place due
to Signal Passing at Danger by Crew and leading to collision or derailments.
Even after repeated instructions / guidelines issued from Board and discussion under
various forums and safety seminars there is no reduction in SPAD cases. This indicates lack
of supervision by Division and Zonal level officials.
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
16/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
9
1.1.8 Provision of Vigilance Control Device
Progress of Vigilance Control Device (VCD) on electric locos is as under:
Total electric loco holding as on 01.04.2012 : 4341
No. of three phase electric locos : 491
No. of conventional loco to be provided with VCD : 3636
No. of conventional locos provided with VCD so far : 2110
Balance conventional locos to be provided : 1524
Total electric locos provided with VCD : 2612
(61 % of the total fleet of
elect locos)
Target : 75% by Apr’12
100% by Jun’12
Orders already placed.
Page 10
Railway wise status of provision of VCDs is as under :
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
17/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
Railways CR ER ECR ECoR NR NCR SR SCR SER SECR WR WCR Total
No. of
locos to be
provided
382 222 241 261 217 336 369 365 432 118 233 458 3634
No. of
locos
provided
276 197 38 61 40 206 151 365 309 111 233 123 2110
Balance 106 25 203 200 177 130 218 0 123 7 0 335 1524
Rly /make wise brake up of VCD is as under:
S.
No.
VCD
Make
RDSO
Spec.CR ER ECR ECoR NR NCR SR SCR SER SECR WR WCR Total
1 AAL Other 26 1 27
2 ICE Other 1 1
3 ICE Rev. 5 46 116 21 30 181 185 51 630
4 Medha Other 20 1 10 19 1 51
5 Medha Rev. 5 3 60 4 9 157 2 41 99 5 54 4 438
6 Saitronik Other 39 10 4 30 19 22 19 143
7 Saitronik Rev. 5 56 26 1 141 3 227
8 SIL Rev. 5 1 1 13 15
9 Stesalit Rev. 5 105 23 129 3 106 179 33 578
GTotal 2110
Railways to discus on following points:
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
18/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
10
• Railways to prepare action plan for providing VCD’s in all locos by Jun’2012.• The performance of VCD’s should be submitted to RDSO in prescribed Performa.
• All running staff and crew should be counseled to avoid cases of mal-operation.
• No loco fitted with VCD should be turned out from shed in VCD isolated condition
and locos with VCD isolation during run should be got attended at the nearest shed.
• Counseling / demonstration of trouble shooting in case of VCD activation / mal
functioning should be conducted by Loco Inspectors during foot plate inspections,
wherever possible.
Page 11
1.2 Review of important ongoing works
1.2.1 Constraints of homing capacity of locomotives on IR
S.NoDescription No of
locos
(i) Holding of Electric Locos as on 01.4.12 4341
(ii) Homing capacity available as on 01.4.12 3965
(iii) Expected holding capacity of sheds including sanctions up to 2012-13. 5425
(iv) Expected loco holding of electric locos by end of XII Plan i.e (2016-17). 6169
(v) Shortfall in holding capacity by 2016-17 (iv) - (iii) 744
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
19/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
1.2.2 Review of important ongoing works
Progress in most of these works is slow even after 4 to 5 years of their sanction. Due to
scarcity of funds at present, Railways are advised to priorities works expected to be
completed by next financial year i.e. 2012-13. Re-appropriation of fund allotted to different
works may be done within GM’s power to complete selected works.
Central Railway
Name of the work Status
ELS/AQ : Augmentation of homing capacity
from 120 to 175 elect. Locos
Year of sanction : 2009-10
Sanctioned cost : Rs. 9.81 Cr.
Funds utilized up to 31.03.12: Rs. 0.62 Cr.
Funds allotted for 2012-13 : Rs. 2.25 Cr.
ELS/KYN : Facilities for maintenance of
three phase electric locos
Year of sanction : 2009-10
Sanctioned cost : Rs. 15.78 Cr.
Funds utilized up to 31.03.12: Rs. 0.93 Cr.
Funds allotted for 2012-13 : Rs. 2.00 Cr.
ELS/DD : Setting up of Electric loco shed at
Daund to home 200 three phase elect locos
has been sanctioned in Budget 2012-13
Sanctioned cost : Rs. 67.42 Cr.
Central Railway to expedite preparation of
detailed estimate and early process for
tenders
ELS/BSL : Augmentation of homing capacity
from 150 to 175 elect locos has been
sanctioned in Budget 2012-13.
Sanctioned cast Rs. 3.9 Cr.
Central Railway to expedite for early
completion of work.
ELS/KYN: Renovation of shed for
development of facilities for maintenance of
AC Locos
Funds utilized up to 31.03.12: Rs. 2.40 Cr.
Funds allotted for 2012-13 : Rs. 0.50 Cr.
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
20/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
11
Year of sanction : 2007-08Sanctioned cost : Rs. 4.97 Cr.
Page 12
ELS/BSL : Augmentation of homing capacity
up to 150 elect locos
Year of sanction : 2007-08
Sanctioned cost : Rs. 5.60 Cr.
Funds utilized up to 31.03.12: Rs. 5.50 Cr.
Funds allotted for 2012-13 : Rs. 0.10 Cr.
ELW/BSL : Augmentation of Wheel set
manufacturing capacity
Year of sanction : 2010-11
Sanctioned cost : Rs. 4.13 Cr.
Funds utilized up to 31.03.12: Rs. 0.19 Cr.
Funds allotted for 2012-13 : Rs. 1.0 Cr.
Total funds made available to Central Railway : Rs. 5.95 Cr.
Eastern Railway
Name of the work Status
ELS/ASN : Augmentation of homing capacity
from 100 to 125 elect locos has been sanctioned
in Budget 2012-13.
Sanctioned cast Rs. 13.5 Cr.
Eastern Railway to expedite for early
completion of work.
ELS/HWH : Setting up of Capital stores depot
electric loco shed/Howrah has been
Eastern Railway to expedite for early
completion of work.
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
21/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
12
sanctioned in Budget 2012-13Sanctioned cost : Rs. 3.14 Cr.
East Central Railway
Name of the work Status
ELS/GMO : Augmentation of homing capacity
from 120 to 175 elect. Locos
Year of sanction : 2011-12
Sanctioned cost : Rs. 14.25 Cr.
Funds utilized up to 31.03.12: Rs. 0.03 Cr.
Funds allotted for 2012-13 : Rs. 2.00 Cr.
ELS/MGS : Augmentation of homing capacity from
120 to 150 elect. Locos
Year of sanction : 2010-11
Sanctioned cost : Rs. 2.94 Cr.
Funds utilized up to 31.03.12: Rs. 1.99 Cr.
Funds allotted for 2012-13 : Rs. 0.94 Cr.
ELS/BJU : Setting up of Electric loco shed at
Barauni to home 100 electric locos has been
sanctioned in Budget 2010-11
Sanctioned cost : Rs. 49.6 Cr.
Funds utilized up to 31.03.12: Rs. 0.30 Cr.
Funds allotted for 2012-13 : Rs. 2.00 Cr.
ELS/GMO : Augmentation of homing capacity
from 100 to 120 elect. Locos
Year of sanction : 2007-08
Sanctioned cost : Rs. 3.45 Cr.
Funds utilized up to 31.03.12: Rs. 0.69 Cr.
Funds allotted for 2012-13 : Rs. 0.50 Cr.
Total funds made available to East Central Railway : Rs. 5.44 Cr.
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
22/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
Page 13East Coast Railway
Name of the work Status
ELS/ANGL : Augmentation of homing capacity
from 100 to 150 elect. Locos
Year of sanction : 2011-12
Sanctioned cost : Rs. 15.00 Cr.
Funds utilized up to 31.03.12:Rs. 0.03 Cr.
Funds allotted for 2012-13 : Rs. 1.00 Cr.
ELS/VSKP : Augmentation of homing capacity
from 150 to 175 elect. Locos
Year of sanction : 2009-10
Sanctioned cost : Rs. 12.61 Cr.
Funds utilized up to 31.03.12:Rs. 0.06 Cr.
Funds allotted for 2012-13 : Rs. 2.4 Cr.
ELS/VSKP : Augmentation of homing capacity
from 100 to 150 elect. Locos
Year of sanction : 2008-09
Sanctioned cost : Rs. 7.25 Cr.
Funds utilized up to 31.03.12: Rs. 3.77Cr.
Funds allotted for 2012-13 : Rs. 0.60Cr.
Total funds made available to East Coast Railway: Rs. 4.0 Cr
Northern Railway
Name of the work Status
ELS/LDH : Augmentation of homing capacity
from 120 to 150 elect. Locos
Year of sanction : 2007-08
Sanctioned cost : Rs. 5.17 Cr.
Funds utilized up to 31.03.12:Rs. 3.91 Cr.
Funds allotted for 2012-13 : Rs. 1.25 Cr.
ELS/LDH : Augmentation of homing capacity Funds utilized up to 31.03.12: Rs. 0.08 Cr.
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
23/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
13
from 150 to 175 elect. LocosYear of sanction : 2010-11
Sanctioned cost : Rs. 8.00 Cr.
Funds allotted for 2012-13 : Rs. 1.39 Cr.
ELS/GZB : Augmentation of homing capacity
from 150 to 175 elect. Locos
Year of sanction : 2010-11
Sanctioned cost : Rs. 8.00 Cr.
Funds utilized up to 31.03.12: Rs. 0.06 Cr.
Funds allotted for 2012-13 : Rs. 3.00 Cr.
ELS/KJGY : Setting up of electric loco shed at
Khan-Alampura to home 100 electric locos
Year of sanction : 2008-09
Sanctioned cost : Rs. 60.8 Cr.
Funds utilized up to 31.03.12: Rs. 14.1 Cr.
Funds allotted for 2012-13 : Rs. 5.00 Cr.
ELS/GZB : Augmentation of homing capacity
from 120 to 150 elect. Locos
Year of sanction : 2009-10
Sanctioned cost : Rs. 17.36 Cr.
Funds utilized up to 31.03.12: Rs. 0.69 Cr.
Funds allotted for 2012-13 : Rs. 1.00 Cr.
Page 14
ELS/MGS : Setting up of 2nd
electric loco shed
at Mughalsarai to home 200 electric locos
Year of sanction : 2012-13
Sanctioned cost : Rs. 55.14 Cr.
Northern Railway to expedite for early
preparation of estimate for initiating
tendering process.
Total funds made available to Northern Railway : Rs. 11.7 Cr.
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
24/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
North Central Railway
Name of the work Status
ELS/CNB : Augmentation of homing capacity
from 120 to 150 elect. Locos
Year of sanction : 2007-08
Sanctioned cost : Rs. 6.58 Cr.
Funds utilized up to 31.03.12:Rs. 3.62 Cr.
Funds allotted for 2012-13 : Rs. 1.00 Cr.
ELS/CNB : Augmentation of homing capacity
from 150 to 175 elect. Locos
Year of sanction : 2010-11
Sanctioned cost : Rs. 9.65 Cr.
Funds utilized up to 31.03.12: Rs. 0.63 Cr.
Funds allotted for 2012-13 : Rs. 0.50 Cr.
ELS/JHS : Augmentation of homing capacity
from 120 to 150 elect. Locos
Year of sanction : 2007-08
Sanctioned cost : Rs. 8.37 Cr.
Funds utilized up to 31.03.12: Rs. 2.00 Cr.
Funds allotted for 2012-13 : Rs. 0.50 Cr.
ELS/JHS : Augmentation of homing capacity
from 150 to 175 elect. Locos
Year of sanction : 2009-10
Sanctioned cost : Rs. 8.59 Cr.
Funds utilized up to 31.03.12: Rs. 1.18 Cr.
Funds allotted for 2012-13 : Rs. 0.50 Cr.
Total funds made available to East Coast Railway: Rs. 2.50 Cr.
North Western Railway
Name of the work Status
Rewari : Setting up of electric loco
maintenance depot for 9000 HP electric locos
Part of DFFCIL project.
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
25/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
14
(200 nos)Year of sanction : 2012-13
Sanctioned cost : Rs. 291 Cr.
Page 15
Southern Railway
Name of the work Status
ELS/RPM : Augmentation of homing
capacity from 50 to 100 elect. Locos
Year of sanction : 2008-09
Sanctioned cost : Rs. 15.73 Cr.
Funds utilized up to 31.03.12: Rs. 7.21 Cr.
Funds allotted for 2012-13 : Rs. 8.00 Cr.
ELS/ED : Augmentation of homing capacity
from 120 to 175 elect. Locos
Year of sanction : 2010-11
Sanctioned cost : Rs. 12.73 Cr.
Funds utilized up to 31.03.12: Rs. 2.72 Cr.
Funds allotted for 2012-13 : Rs. 2.00 Cr.
Total funds made available to Southern Railway : Rs. 10.0 Cr.
South Central Railway
Name of the work Status
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
26/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
15
ELS/LGD : Augmentation of homingcapacity from 150 to 175 elect. Locos
Year of sanction : 2011-12
Sanctioned cost : Rs. 7.07 Cr.
Funds utilized up to 31.03.12: Rs. 0.03 Cr.Funds allotted for 2012-13 : Rs. 2.00 Cr.
ELS/LGD : Maintenance facility for homing
WAG-9 locos
Year of sanction : 2010-11
Sanctioned cost : Rs. 10.39 Cr.
Funds utilized up to 31.03.12: Rs. 7.75 Cr.
Funds allotted for 2012-13 : Rs. 1.00 Cr.
ELS/LGD : Augmentation of homing
capacity from 100 to 150 elect. Locos
Year of sanction : 2008-09
Sanctioned cost : Rs. 6.99 Cr.
Funds utilized up to 31.03.12: Rs. 1.92 Cr.
Funds allotted for 2012-13 : Rs. 1.50 Cr.
ELS/BZA : Augmentation of homing
capacity from 120 to 175 elect. Locos
Year of sanction : 2008-09
Sanctioned cost : Rs. 12.76 Cr.
Funds utilized up to 31.03.12: Rs. 2.91 Cr.
Funds allotted for 2012-13 : Rs. 1.50 Cr.
ELS/KZJ : Augmentation of homing capacity
from 100 to 125 elect. Locos
Year of sanction : 2010-11
Sanctioned cost : Rs. 11.02 Cr.
Funds utilized up to 31.03.12: Rs. 0.63 Cr.
Funds allotted for 2012-13 : Rs. 2.00 Cr.
ELS/GTL : Setting up of Electric loco
shed at Guntakal to home 100 electric locos
has been sanctioned in Budget 2008-09
(Suppl.)
Sanctioned cost : Rs. 79.3 Cr.
Funds utilized up to 31.03.12: Rs. 1.75 Cr.
Funds allotted for 2012-13 : Rs. 5.00 Cr.
Total funds made available to South Central Railway: Rs. 13.0 Cr
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
27/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
Page 16
South Eastern Railway
Name of the work Status
ELS/TATA : Maintenance facility for homing
WAG-9 locos
Year of sanction : 2008-09
Sanctioned cost : Rs. 9.67 Cr.
Funds utilized up to 31.03.12: Rs. 0.25 Cr.
Funds allotted for 2012-13 : Rs. 2.00 Cr.
ELS/BNDM : Augmentation of homing
capacity up to 175 elect. Locos
Year of sanction : 2009-10
Sanctioned cost : Rs. 10.21 Cr.
Funds utilized up to 31.03.12: Rs. 1.67 Cr.
Funds allotted for 2012-13 : Rs. 2.00 Cr.
ELS/BKSC : Setting up of electric loco shed
at Bokaro to home 100 electric locos
Year of sanction : 1996-97
Sanctioned cost : Rs. 43.0 Cr.
Funds utilized up to 31.03.12: Rs. 35.5 Cr.
Funds allotted for 2012-13 : Rs. 7.48 Cr.
ELS/SRC : Extension of shed to home 50
electric locos
Year of sanction : 2008-09
Sanctioned cost : Rs. 3.18 Cr.
Funds utilized up to 31.03.12: Rs. 2.21 Cr.
Funds allotted for 2012-13 : Rs. 0.45 Cr.
ELS/TATA : Extension of wheel shop at
Centralized traction repair shop TATA
Year of sanction : 2009-10
Sanctioned cost : Rs. 5.95 Cr.
Funds utilized up to 31.03.12: Rs. 0.12 Cr.
Funds allotted for 2012-13 : Rs. 0.50 Cr.
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
28/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
16
ELS/BNDM : Setting up of 2nd
electric loco
shed at Bondamunda to home 200 electric
locos
Year of sanction : 2012-13
Sanctioned cost : Rs. 111.19 Cr.
South Eastern Railway to expedite for early
preparation of estimate for initiating
tendering process.
Total funds made available to South Eastern Railway: Rs. 12.43 Cr
South East Central Railway
Name of the work Status
ELS/RIG(BSP) : Setting up of electric loco
shed at Bilaspur to home 100 electric locos
has been sanctioned in Budget 2008-09
Sanctioned cost : Rs. 58.81 Cr.
Funds utilized up to 31.03.12: Rs. 0.71 Cr.
Funds allotted for 2012-13 : Rs. 5.00 Cr.
ELS/BIA : Augmentation of homing
capacity from 150 to 175 elect. Locos
Year of sanction : 2008-09
Sanctioned cost : Rs. 12.0 Cr.
Funds utilized up to 31.03.12: Rs. 7.65 Cr.
Funds allotted for 2012-13 : Rs. 3.83 Cr.
Page 17
ELS/BIA : Augmentation of homing
capacity to 150 elect. Locos
Year of sanction : 2007-08
Funds utilized up to 31.03.12: Rs. 4.64 Cr.
Funds allotted for 2012-13 : Rs. 0.12 Cr.
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
29/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
Sanctioned cost : Rs. 4.76 Cr.
Total funds made available to South East Central Railway: Rs. 8.95 Cr
Western Railway
Name of the work Status
ELS/BRC : Augmentation of homing
capacity up to 150 elect. Locos
Year of sanction : 2009-10
Sanctioned cost : Rs. 7.41 Cr.
Funds utilized up to 31.03.12: Rs. 5.27 Cr.
Funds allotted for 2012-13 : Rs. 1.50 Cr.
ELS/BRC : Augmentation of homing
capacity from 150 to 175 elect. Locos
Year of sanction : 2010-11
Sanctioned cost : Rs. 11.03 Cr.
Funds utilized up to 31.03.12: Rs. 0.89 Cr.
Funds allotted for 2012-13 : Rs. 3.00 Cr.
ELS/BL : Augmentation of homing
capacity from 100 to 150 elect. Locos
Year of sanction : 2010-11
Sanctioned cost : Rs. 8.00 Cr.
Funds utilized up to 31.03.12: Rs. 0.63 Cr.
Funds allotted for 2012-13 : Rs. 0.01 Cr.
Dabhoi : Setting up of new periodical
overhauling shop for electric locos at
Dabhoi
Year of sanction : 2007-08
Sanctioned cost : Rs. 17.89 Cr.
Funds utilized up to 31.03.12: Rs. 12.5 Cr.
Funds allotted for 2012-13 : Rs. 1.00 Cr.
Dahod : Augmentation of MTR
capacity 54 to 108 elect. Locos
Year of sanction : 2010-11
Sanctioned cost : Rs. 28.0 Cr.
Funds utilized up to 31.03.12: Rs. 0.63 Cr.
Funds allotted for 2012-13 : Rs. 0.01 Cr.
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
30/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
17
Total funds made available to Western Railway: Rs. 5.52 Cr.
West Central Railway
Name of the work Status
ELS/ET : Augmentation of homing
capacity 100 to 120 elect. Locos
Year of sanction : 2007-08
Sanctioned cost : Rs. 4.5 Cr.
Funds utilized up to 31.03.12: Rs. 4.24 Cr.
Funds allotted for 2012-13 : Rs. 0.26 Cr.
Page 18
ELS/NKJ : Augmentation of homing
capacity 100 to 120 elect. Locos
Year of sanction : 2007-08
Sanctioned cost : Rs. 3.15 Cr.
Funds utilized up to 31.03.12: Rs. 2.31 Cr.
Funds allotted for 2012-13 : Rs. 0.40 Cr.
ELS/ET : Augmentation of homing
capacity up to 175 elect. Locos
Year of sanction : 2009-10
Sanctioned cost : Rs. 16.08 Cr.
Funds utilized up to 31.03.12: Rs. 0.65 Cr.
Funds allotted for 2012-13 : Rs. 4.00 Cr.
ELS/NKJ : Augmentation of homing
capacity from 120 to 175 elect. Locos
Year of sanction : 2008-09
Funds utilized up to 31.03.12: Rs. 0.86 Cr.
Funds allotted for 2012-13 : Rs. 2.00 Cr.
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
31/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
Sanctioned cost : Rs. 9.79 Cr.
ELS/TKD : Augmentation of homing
capacity 120 to 175 elect. Locos
Year of sanction : 2008-09
Sanctioned cost : Rs. 9.99 Cr.
Funds utilized up to 31.03.12: Rs. 6.31 Cr.
Funds allotted for 2012-13 : Rs. 1.8 Cr.
Itarsi : Drop table hydraulic lifting and
traversing system
Year of sanction : 2012-13
Sanctioned cost : Rs. 3.25 Cr.
West Central Railway to expedite for early
preparation of estimate for tendering
process & commissioning.
Total funds made available to West Central Railway: Rs. 8.40 Cr
Chittaranjan Locomotive Works
Name of the work Status
Additional facilities for enhancing
production capacity up to 200 locos
per annum.
Year of sanction : 2006-07
Sanctioned cost : Rs. 92.51 Cr.
Funds utilized up to 31.03.12: Rs. 22.6 Cr.
Funds allotted for 2012-13 : Rs. 2.00 Cr.
Augmentation of facilities for
enhancing production capacity of three
phase locos up to 50 per annum.
Year of sanction : 2007-08
Sanctioned cost : Rs. 15.52 Cr.
Funds utilized up to 31.03.12: Rs. 2.23 Cr.
Funds allotted for 2012-13 : Rs. 2.00 Cr.
Modernization and augmentation of
production capacity from 200 to 275
locos per annum.
Funds utilized up to 31.03.12: Rs. 12.0 Cr.
Funds allotted for 2012-13 : Rs. 2.00 Cr.
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
32/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
18
Year of sanction : 2010-11Sanctioned cost : Rs. 134.4 Cr.
Page 19
Center of excellence for design,
development & evaluation of advanced
technology system for electric rolling
stock
Year of sanction : 2010-11
Sanctioned cost : Rs. 65.32 Cr.
Funds utilized up to 31.03.12: Rs. 12.0 Cr.
Funds allotted for 2012-13 : Rs. 2.00 Cr.
Total funds made available to CLW: Rs. 8.00 Cr.
Railways & CLW to discuss.
1.3 RSP items sanctioned in Budget 2012-13
1.3.1 Details of Misc. Spares sanctioned in Bulk RSP 2012-13 are placed at Annexure-TRS-I
1.3.2 Details of Capital Spares sanctioned in Bulk RSP 2012-13 are placed at Annexure- TRS-II
1.3.4 Details of Items sanctioned in IRSP 2012-13 are placed at Annexure-TRS-III
1.3.5 Details of New Works sanctioned in Budget 12-13 under PH-42 is placed at Annex- TRS-IV.
1.4 Three phase electric locos- Reliability and Operational issues – Preparedness of Railways
for summer
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
33/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
19
Three phase loco equipment showing rising failure trend are as under:-
SNo Equipments Total Failure Shed requiring attention
(10-11, 11-12 arising)10-11 11-12
1 Traction converter
a GTO/Valve set 124 224 GZB(27-71), AQ(15-27), LGD(19-56)
b PCB Cards 161 384 GZB(13-161), AQ(37-63), LGD(49-68), TKD(15-
29), BIA(9-17)
c Gate unit 75 117 GZB(6-35), GMO(57-66), AQ(1-4), LGD(4-8)
d Fiber optic cable 3 5 GMO(3-4), BIA(0-1)
2 Aux. converter
a PCB Cards 84 174 GZB(10-69), GMO(16-35), AQ(21-26), BIA(3-13)
3 Central Electronics
a PCB cards 118 247 GZB(2-106), GMO(32-36), LGD(32-43), BIA(10-
19)
4 Transformer
a Pressure sensor 17 24 GZB(1-3), GMO(5-9), AQ(5-8)
b Cable Head Termination 0 2 GZB(0-2)
5 Traction Motor
a Temp. sensor 31 56 GZB(5-17), GMO(0-2), LGD(14-26)
b End shield components 8 11 GMO(0-7), LGD(0-4),
6 Oil cooler blower unit
a Radiator 9 15 GMO(4-8), AQ(0-6)
7 Transformer /Converter oil
pump
97 125 GZB(18-47), LGD(21-32)BIA(1-5)
8 Compressor / Aux. compressor 37 93 GZB(9-12), LGD(17-59), TKD(3-12), BIA(1-4)
9 E-70 brake system
a Pn. Valve 69 115 GZB(7-16), GMO(28-49), LGD(13-24), BIA(5-11)
b PBU/TBU 60 65 GZB(8-17), AQ(22-29), TKD(0-3),
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
34/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
Page 20c Brake electronics cards 19 27 LGD(2-5), TKD(0-4), BIA(1-2)
d Panel 9 13 GZB(0-2), GMO(7-11)
10 Vacuum circuit breaker (VCB) 45 57 GZB(13-20), AQ(8-12), LGD(0-11), TKD(2-4),
BIA(0-2)
11 Surge arrestor/Roof insulator 0 6 GZB(0-5), BIA(0-1)
12 Angle transmitter/Selector
switch
16 31 GZB(1-22), AQ(3-5)
13 Memotel speedometer 16 52 GZB(0-19), GMO(11-23), BIA(0-6)
14 Battery /Battery Box 16 21 AQ(1-12), TKD(0-4)
15 EM Contactor/Relay 13 29 GZB(0-7), AQ(6-13),
16 Three phase 415V AC MCBs 30 37 AQ(17-22), BIA(0-7)
17 Hurth coupling 15 58 GZB(15-58)
18 MSU with bearing 5 10 GZB(1-4), AQ(2-4)
19 Bogie
a Suspension spring
(Primary/Secondary)
123 196 GZB(25-55), GMO(20-43), AQ(64-75), LGD(14-
19), BIA(0-3)
b Dampers 123 620 GZB(29-385), GMO(44-79), AQ(36-121), LGD(13-
33)
c Alcathan ring 15 64 GZB(8-15), GMO(1-15), AQ(5-31)
20 Display Unit (Switches) 31 59 GZB(0-11), AQ(15-24), LGD(5-8), TKD(1-5),
BIA(0-3)
21 Fire Detection unit 30 45 GZB(0-5), AQ(14-22), LGD(1-5), BIA(3-8)
22 Horn/Wiper/Gauges 14 88 GZB(0-45), GMO(11-27), BIA(3-16)
• Board, vide letter no. 2005/Elect(TRS)440/23 dated 10.02.2012 & 04.04.2012
(ANNEXURE-TRS-V) had issued Summer & Monsoon preparedness & General
instruction for Loco Pilots while on three phase electric locos. Zonal Railways to
counsel all the running staff in lobbies, training schools, on line etc. to ensure smooth
operation during summer season.
• RDSO, vide letter no. EL/3.1.35/2 Electrical dated 04.04.2012, had issued revision ‘2’
Trouble shooting directory of 3-phase electric locomotives which includes the
following:
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
35/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
20
➢ All previous amendments
➢ Trouble shooting regarding Harmonic filter
➢ Allowed bogie isolation without making MCE ‘OFF” due to software modification
➢ Some changes in brake system and for locos equipped with CCB brake system
Railways to update respective TSDs, issued to Loco Pilots and counsel the running staff
accordingly.
• RDSO has issued Technical circular no. RDSO/2012/EL/TC/0113, Rev’0’ dated 29.03.12
on pneumatic testing of three phase electric locomotives to reduce cases of MR
pressure not maintaining. Railways to ensure strict adherence in loco sheds and
workshops to parameters & specified values containing in above TC.
• There have been cases of intermittent messages in three phase loco PCB cards no. PPA
988 & PPB 622 having indigenized BAP ASIC. Based on the MOM on reliability of
electronics held on 09.02.12 at ELS/GZB, 0.5 mW, 24 MHz (Jauch make) crystal in place
Page 21
of existing 1 mW, 24 MHz crystal on these cards by ELS/GZB, AQ, LGD, GMO and TKD
on trial basis. Performance has been reported satisfactory in most of the modified
cards. Accordingly, RDSO, vide letter no. EL/11.5.5/5 dated 13.04.12, has issued
instructions to Zonal Railways for replacement of 1 mW crystal of 24 MHz by Juach
make 0.5 mW in PPA 988 & PPA 622 cards. The spare crystals of 0.5mW, 24 MHz
(Jauch make) shall be given by M/s. BTIL to Zonal Railways. Railways to take action
accordingly.
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
36/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
37/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
21
Page 22
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
38/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
22
Elect.(G)
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
39/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
Page 23
2.0 Electrical (G)
2.1 Punctuality performance on TL/AC, EMU & PS account on ownership basis during the
period Apr’11- Mar’12 vis a vis Apr.10-Mar’11 ( Position as per ICMS)
Rly Holding of coaches as on
31.1.2012
No of incidences on AC/TL,
PS & EMU account
% imp/det.
AC TL EMU/
MEMUs
Apr’10-
Mar’11
Apr’11-
Mar’12
CR 660 3022 1798 69 65 5.8
ECoR 392 1761 - 61 63 -3.3
ECR 330 2637 207 92 104 -13.0
ER 634 3011 1916 58 58 0.0
NCR 128 925 - 47 36 23.4
NER 212 1827 - 25 25 0.0
NFR 257 1853 - 68 47 30.9
NR 1809 4103 573 176 115 34.7
NWR 295 1809 - 9 10 -11.1
SCR 535 3181 213 23 10 56.5
SECR 100 702 90 23 06 73.9
SER 505 2613 424 84 59 29.8
SR 792 433 803 49 32 34.7
SWR 396 1894 8 33 21 36.4
WCR 132 878 - 14 15 -7.1
WR 831 2974 1434 36 26 27.8
Total 8008 37550 7466 867 692 20.2
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
40/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
23
Though on overall improvement of 20.2% on AC/TL, PS & EMU account during Apr’11- Mar’12
as compared to last year. Performance of EcoR, NFR, ECR, NCR & NER on AC account needs to
be improved as no of failure vis –a vis holding are very high on these Railways.
2.2 Progress of important sanctioned works.
A. Construction of EMU/MEMU sheds:
( Rs. in thousand)
SN Station Year of
sanction
Alloc. Anticipat
ed cost
Latest status
1. Lucknow
(MEMU)
2008-09 DF(3) 188812 Sub-station building completed. 75%
of Boundary wall completed. The
work of Administrative Block & Staff
quarters are underway. Total
expenditure incurred by the end of
2011-12 is Rs. 7.99 crores as indicated
in pink book and Rs. 1 crore has been
allocated for 2012-13.
2 Khurda 2007-08 CAP 97121 Land cutting work completed. Total
Page 24
SN Station Year of
sanction
Alloc. Anticipat
ed cost
Latest status
Road expenditure incurred by the end of
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
41/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
(MEMU) 2011-12 is RS. 6.02 crores as indicatedin pink book and Rs. 1.8 crore has
been allocated for 2012-13.
3 Quilon
(MEMU)
2007-08 CAP 113673 Construction of shed completed.
Electrification work is in progress.
OHE mast erected. S & T works not
yet started. Total expenditure
incurred by the end of 2011-12 is Rs.
11.05 crores as indicated in pink book
and Rs. 31.6 lacs has been allocated
for 2012-13.
B. Passenger Information System
S.
No
Name of the work Year of
sanction
Alloc. Anticipated cost
Latest status
1. Provision of PIS in 66
rakes of
EMUs/MEMUs – SR
2009-10 DF(1) 75200 Tender opened on 22.09.11.
Under TC.
2. Provision of PIS in 50
rakes of EMUs/
MEMUs - SER
2009-10 DF(1) 57000 Tender opened on
29.07.2011 and discharged.
3. Provision of PIS in
141 rakes of EMUs/
MEMUs – ER
2009-10 DF(1) 160700 Tender submitted to Stores
and is to be floated.
4. Provision of PIS in 45
rakes of EMUs/
MEMUs – NR
2009-10 DF(1) 51300 Order placed on M/s HCL.
C. Other important works pertaining to EMUs:
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
42/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
24
S.No Name of thework Yearof
sancti
on
Alloc. Anticipated cost (inthousands)
Latest status
1. Retrofitment of
existing DC
EMU rakes -70
rakes ( CR- 40
rakes &WR- 30
rakes)
2010-
11
DRF/CAP 3000000 So far CR has retrofitted 7 rakes of
9 car and WR retrofitted 3 rakes
of 12 car. During the current year,
CR has to complete target of 40
rakes & WR 30 rakes.Rs. 167
crores has been allocated during
2012-13 for this work
Page 25
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
43/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
Railway
Electrification
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
44/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
25
Page 26
3.0 RAILWAY ELECTRIFICATION
3.1 Distribution of Sanctioned Electrification Works in 2012-13:-
SN Name of Section RKM Executing Agency
1 Angul-Sambalpur 156 ECoR
2 Jharsuguda-Sambalpur-Titlagarh 230 CORE
3 Pakur-Malda-Kumedpur 153 CORE
4 Andal-Sitarampur 57 CORE
5 Nallapadu-Guntakal 426 CORE
6 Guntakal-Bellary-Hospet 138 RVNL
7 Amla-Chhindwara-Kalumna 257 RVNL
8 Manheru-Hisar 74 RVNL
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
45/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
26
9 Garwa Road-Chopan-Singrauli 257 CORE
10 Coimbatore-Mettupalayam 33 CORE
11 Itarsi-Katni-Satna-Manikpur-
Chheoki incl. Satna-Rewa
653 CORE
Distribution advising the above has already been issued vide Board’s letter no
2006/RE/161/4 Vol.VI dated 16.4.12. Earlier electrification work of UHM-Katra –Dharam has
been awarded to CORE and Dharam –Baramula to M/s IRCON vide Railway Board’s letter
No.2009/W-2/NL/N/1 dt. 05.01.2012 and 2009/W-2/NL/N/1 dt. 04.04.12. CORE, ECoR
should send the detailed estimates to Board’s office within next three months wherever
sanction does not lie within their competency.
3.2 ( A) Electrification during 2011-12
Target Achievement
CORE 1000 804
RVNL 251 214
Zonal Railways - 147
Total (RKM) 1110 1165
Total (TKM)220 560
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
46/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
Page 27(B) CRS Inspections during 2011-12
SN Section Rly RKM
CORE
1 Tiruchhirapalli-Dindigul SR 94
2 Bina-Kota WCR 308
3 Alamnagar-Utratia NR 23
4 Bangalore Area SWR 10
5 Bangarpeth-Marikuppam SWR 16
Total 451
RVNL
1 Tomka-Banspani ECoR 144
(C) Section to be Electrified during 2012-13
CORE 1000 RKM
RVNL 300 RKM
(Reference : Railway Bd.’s letter No.2011/RE/161/5 dt.03.01.2012)
While deciding the sections to be electrified during 12-13, CORE should plan continuous long
sections. It has already been advised that in 2012-13, the credits taken for new
electrification should be a judicious mix of 2.2 KV and 25 KV. From 2013-14 onwards, credit
would be given only for 25 KV electrification.(Ref. Railway Bd.’s letter No.2006/RE/161/4
dt.28.03.2012 ). It is seen that TSS, FOB, ROB, other service buildings, quarters get lesser
priority. However, all these works should go hand in hand with the OHE works.
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
47/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
27
(D) Sections likely to be opened after CRS Inspection during 2012-13
CORE, Zonal Railway should ensure that at least the following section gets opened on
electric traction after CRS inspections in (2012-13):
SN Section Rly RKM
1 Moradabad-Lucknow-Mughalsarai NR 348
2 Khurja-Meerut-Saharanpur & Ghaziabad-Meerut NR 254
3 Jalandhar-Chakkibank-Jammu Tawi NR 222
4 Shakurbasti-Rohtak NR 60
5 Varanasi-Janghai-Allahabad NR 207
6 Barauni-Chhapra ECR 140
7 Trivendrum-Kanyakumari SR 87
Page 28
SN Section Rly RKM
8 Dindigul-Madurai-Nagercoil SR 292
9 Vellore-Villupuram SR 150
10 Kengeri-Ramanagram SWR 32
11 Manmad-Punthamba-Shirdi CR 85
12 Pandabeshwar-Sainthia-Pakur ER 135
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
48/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
13 Barabanki-Burhwal-Gonda NER 90
14 Ujjain-Indore & Dewas-Maksi WR 116
15 Jhansi-Kanpur NCR 241
16 Katihar-Barsoi-Kishanganj NFR 90
17 Tandur-Wadi SCR 66
18 Kadapa-Muddanuru-Guntakal SCR 190
Total 2805
CORE should advise their month wise targets for various CRS inspections .
Summary:-
NR – 1091, ECR – 140, SR – 529, SWR – 32, CR – 85, ER – 135, NER – 90,
WR – 116, NCR – 241, NFR – 90, SCR – 256
Railways must gear up to take over the above sections including creation of maintenance
posts.
3.3 TRD Post Creation
CRB has written D.O. to following GMs on 03.04.2012 for creation of maintenance posts for
TRD for newly created assets:
Sno Rly Section
I NR Rosa-Moradabad, Shakurbasti-Rohtak, Hardoi-Rosa, Khurja-
Meerut Suchipind-Chakkibank, Utratia-Sultanpur-Mughalsarai
II SR Trivandrum-Kanyakumari
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
49/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
28
III ECR Chhapra-Hajipur-BarauniIV WR Ujjain-Indore and Dewas-Maksi
V NCR Jhansi-Kanpur
Page 29
3.4 Progress of RE works for Jammu Tawi-Ludhiana, MB-LKO-MGS
Major issues
Jammu Tawi -Chakkibank➢ TSS at Sujanpur, Samba.
➢ 50 bridge masts.
➢ FOB raising at Pathankot
➢ CLS works at Pathankot.
➢ OHE works in JAT, Budhi, Kathua yards.
Chakkibank – Suchipind
➢ Transmission line for Dasua/TSS
➢ Tree cutting issues between RE & NR to be resolved.
➢ Form XVI is under signatures with NR.
➢ CRS application should be submitted latest by 30.04.2012.
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
50/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
29
Moradabad – Bareilly
➢ NI at Rampur
➢ OHE works in Rampur – Bareilly.
Bareilly – Rosa
➢ Form XVI is under signatures with GM/NR. TRD Maintenance posts have also been
vetted. Action plan for filling up of posts have to be advised further to CRS by NR.
➢ CRS application should be submitted latest by 30.4.1012.
Rosa – Hardoi
➢ TRD posts created. Posting should be done by NR before CRS application could be
submitted.
➢ CRS application to be submitted latest by 30.04.2012.
Utratia – Sultanpur – MGS
➢ No TSS with Tr. Line still ready. TSSs are at Utratia, Sindhurwa, Sultanpur, Sarai
Harkhu, Birapatti
➢ SCADA balance.
It has to be ensured that complete section of JAT- Ambala- Moradabad- LKO-MGS comes
on electric traction, after CRS inspection, latest by 31.10.12.
3.5 (A) Important Stores tenders.
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
51/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
Page 30
CEE/CORE should appraise position & planning for steel, contact wire for (2012-13). Bridge
masts position for Chakkibank – JAT should also be apprised. 50 Bridge masts are short at
present in this section.
(B) Works Tender Position.
S.N Group Section RKM/TKM Status
1 141 Chhapara-Gorakhpur
(including Siwan-Thawe)
240 TKM
where re-
tender
done.
Negotiation on 11.04.2012
2 161 Gondia- Ballarshah 250/266 Packet A opened..
3 164 Roza –Sitapur-Burhwal 181/230 T.O. 19.04.2012
4 165 Alwar -Rewari 82/193 Tender opening date to be
decided.
5 152 New Bongaigon -
Guwahati
161/260 Tender opening date to be
decided.
6 160 Rohtak-BTI-LHM 252/580 Packet A TC done. Packet B
opened. Brief note vetted.
TC to be done.
7. 151 NJP – New Bongaigaon 221/390 Appreciation Committee
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
52/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
30
has asked clarification
from TC.
3.6 (A) Position of Gazetted Cadre in CORE
Deptt JAG SS JS Total
S A V S A V S A V S A V
Elect 31 27 4 56 45 11 59 31 28 152 109 43
S= Sanction, A= Available, V= Vacant
Zonal Railways should spare SS & JS officers to CORE. CORE should apprise their
requirements respective Railways.
(B ) Position of Non-Gazetted Cadre in CORE:
Deptt Group “C” Group “D” Total Gr “C” &”D”
S A V S A V S A V
Elect 1375 702 673 331 185 146 1706 887 819
S= Sanction, A= Available, V= Vacant
Page 31
The existing vacancy in CORE is high. With further allotment of 1817 RKms of work to CORE,
each Railway shall release minimum 5 supervisors to CORE. This should be done within a
month.
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
53/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
3.7 Work Charged Posts from CORE to Zonal Railway (Ref: Rly. Bd’ letter No. 2003/RE/225/3
dt.23.03.12).
For supervision and monitoring of ongoing RE projects and later for looking after
maintenance of newly created assets, Zonal Railways shall require officers. To give
immediate respite, CORE may transfer few work charged posts to Zonal Railways. Summary
of the posts to be transferred to Railways is as follows:
Railway Senior Scale JAG
NR 9 -
SR 5 1
SWR 1 1
SCR 1 -
ECR 3 1
NCR 1 -
NFR 4 2
ER 1 -
NWR 1 1
Total 26 6
3.8 Other Items:
(A) Feasibility-cum-Survey Report appearing in Railway Budget 2012-13
SN Section Rly. RKM
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
54/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
31
1 Pakur – Sahibganj-Kiulincluding Bhagalpur-Mandar Hill
ER 301
2 Londa-Miraj-Pune
including Miraj – Kolhapur
SWR & CR 511
3 Maksi-Vijaypur and Guna – Gwalior WCR 440
4 Bibinagar (Pagidipalli)-Nallapadu SCR 274
5 Kurukshetra-Kaithal-Narwana NR 86
6 Guwahati-Tinsukhia via Lumding NFR 523
Page 32
SN Section Rly. RKM
7 Jhansi-Manikpur (including Khairar-Kanpur) NCR 410
8 Hospet-Gadag-Hubli SWR 143
9 Mysore-Hassan-Mangalore
(including Hassan-Arsikere)
SWR 348
10 Manmad-Mudkhed-Lingampalli – Dhone SCR 916
11 Unchahar-Utratia-Balamau-Sitapur NR 164
12 Ranchi-Lohardaga-Tori SER 116
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
55/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
13 Bangalore-Tumkur-Hubli-Londa-
Vasco da Gama (including Birur-Talguppa)
SWR 669
14 Chikjajur-Bellary SWR 183
15 Hisar-Jakhal-Ludhiana NR 209
16 Moradabad-Aligarh
including Bareilly-Chandausi
NR 236
17 Hisar-Bathinda-Suratgarh-Phalodi-
Jodhpur-Bhildi (including Phalodi-
Jaisalmer and Samdari-Munabao)
NWR 1474
18 Panvel-Pen-Roha CR 75
19 Erode - Karur-Tiruchchirappalli
& Karur-Dindigul
SR 215
20 Karaikkal/Karaikkal
port-Thiruvarur-Tanjavur-Tiruchchirappalli
& Nagapattinam-Velankkani
SR 153
Summary : Total – 7446 RKMs
ER – 301, SWR – 1526, CR – 403, WCR – 440, SCR – 1190, NR – 695, NFR – 523, NCR – 410,
SER – 116, NWR – 1474, CR – 368
Railways should send their survey cum feasibility reports to Bd.’s office, duly vetted by
FA&CAO and approved by COM, GM within next three months time i.e. by 15.7.2012.
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
56/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
32
Page 33
(B). The proposed sections for Blue Print-II: A new Blue Print for RE is being made in Board’s
office with following sections under consideration:-
SN Section Railway RKM
1 Panvel-Pen-Roha CR 75
2 Jasai-JNPT CR 29
3Barharwa-Sahibganj-Bhagalpur-Kiul including
Tinpahar-Rajmahal.ER 237
4 Katwa-Azimganj-New Farkka & Azimganj-Nalhati ER 193
5 Guwahati-Tinsukhia via Lumding NFR 514
6 Jaipur-Bandikui-Alwar NWR 150
7 Yeshwantpur-Tumkur-Arsikere-Chikjajur-Hubli SWR 464
8 Hospet-Hubli-Vasco-da-gama & Londa-Miraj SWR 530
9Secunderabad-Mudkhed-Manmad including
Mudkhed -AdilabadSCR 783
10Chandlodiya-Viramgam-Jhund-Maliya Miyana-
SamakhiyaliWR 236
11Mahesana-Viramgaon-Surendranagar-Rajkot-
Jamnagar-Okha & Surendranagar-PipavavWR 764
12
Karaikkal/Karaikkal port-Thiruvarur-Tanjavur-
Tiruchchirappalli SR 153
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
57/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
33
& Nagapattinam-Velankkani
13 Chhapra-Aunrihar-Varanasi-Allahabad NER 337
14 Bakhtiyarpur-Rajgir ECR 53
15Valmikinagar Road-Narkatiaganj-Sagauli-
Muzaffarpur and Sagauli-RaxualECR 240
16 Samastipur-Khagaria ECR 86
17 Samastipur-Darbhanga-Sakri-Jaynagar ECR 105
18 Mansi-Saharsa-Purnia-Katihar ECR 169
19 Bandikui - Idgah NCR 149
20 Manikpur-Banda-Jhansi including Bhimsen-Khairar NCR 400
21 Pune-Satara-Sangli-Miraj CR 278
22Moradabad-Kashipur-Ramnagar, Rampur-Lalkua-
Kathgodam & Lalkua-KashipurNER 254
23 New Jalpaiguri-Siliguri-New Alipurdhar NFR 167
24 New Bongaigaon-Goalpara-Kamakhya-Guwahati NFR 176
25 Amritsar-Batala-Pathankot NR 107
26 Ludhiana-Firozpur-Jalandhar NR 124
27 Moradabad-Chandausi-Harduaganj NR 124
28Unchahar-Raebareli-Utratiya &Unchahar-Dalmau-
Unnao-BalamauNR 326
29 Akbarpur-Faizabad-Barabanki NR 151
30 Firozepur-Bhatinda NR 88
31 Jakhal-Dhuri-Ludhiana NR 128
32 Beas-Govindwal Sahib NR 27
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
58/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
Page 34SN Section Railway RKM
33
Hisar-Bathinda-Suratgarh-Phalodi-
Jodhpur-Bhildi (including Phalodi-
Jaisalmer and Samdari-Munabao)
NWR 1474
34 Falaknuma-Mahaboobnagar-DHONE SCR 282
35 Peddapalli -Karimnagar-Jagtiyal SCR 55
36 Nallapadu-Pagdipalli including Nadikudi-Macherla SCR 273
37 Maroda-Dallirajra SECR 75
38 Tumsar Road-Tirodi SECR 47
39 Ranchi-Lohardaga-Tori SER 116
40Erode - Karur-Tiruchchirappalli
& Karur-DindigulSR 215
41 Madurai-Manamadurai-Rameswar SR 161
42Mysore-Hassan-Sakleshpur-Shoranur & Arsikere-
HassanSWR 347
43 Ruthiyai-Maksi WCR 193
44 Guna-Gwalior WCR 227
45 Ratlam-Nimach-Chittaurgargh-Chanderia-KotaWR &
WCR360
Total 11442
Railways may like to comment and add /modify.
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
59/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
34
Page 35
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
60/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
ElectricalEnergyManagement
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
61/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
35
Page 36
4.0 Electrical Energy Management
4.1 Reliability improvement measures:
1. Although there has been marginal improvement in overall punctuality performance on OHE
account, large no. of punctuality loss cases is a cause of concern and need to be addressed
appropriately by zonal railways whose performance is deteriorating. There have been 669
incidences during Apr-Mar 11-12 compared to 678 cases in corresponding period of last year.
Major causes are due to OHE parting (56 cases compared to 49nos), CB tripping/SCADA
failure (56 cases against 61 cases last year), tower wagon failures (27 against 19 cases
last year) & Grid failures (increased to 177 from 118 cases last year). It is disturbing to note
that only two Railways i.e NCR (26.2%), ECR (25.5%), alone contributed over 51% of the
overall punctuality loss cases. These railways should intensify their efforts to keep the OHE in
good fettle by conducting regular and periodical drives and by initiating immediate corrective
action. The details of the failures are enclosed at Annexure EEM-1.
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
62/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
36
2. As per Board letter no. 2008/Elect(G)/161/8 Punct. New Delhi, dated 26.09.11, each railwayshall submit a one page failure report for each major failure like Panto entanglement, OHE
parting, failure of insulators and LA bursting etc. by the next morning under the signature of
CEE, a copy of this report be also marked to RDSO. RDSO shall submit the detailed analysis to
Board by the end of each month. Most of railways have not started regular feedback to
Board & RDSO.
3. Review of 12 point action plan items, being monitored at Railway level on monthly basis
(Annexure EEM-2), reveals that progress of OHE checking by thermo vision camera is not
satisfactory in ECR,ER,NCR,CR & WR. An action plan shall be chalked out by these Railways to
intensify the drive.
4. Railways shall revalidate their protection scheme at all the TSSs & should target to replace
Electromagnetic relay by numerical relays.
5. Increased no. of grid failures are cause of concern and calls for “Grid Management strategy”
to reduce the no. of power supply failures and secondly to minimize the impact of such
finalization. Review of existing feeding arrangement from DISCOM from the point of
exploring alternate feed, checking of setting of OCR of transformers & transmission line,
review of protection system, existing policy of extension of feed taking approval of
Central/Local Dispatch Center(CDC/LDC) etc. are the need of hour.
6. Recent failures of DA of TTC mast in Jhansi Div./NCR having sharp termination of overlap &
cross over on both side of DA leading to tilting of DA shall be reviewed by RDSO with issue of
suitable guidelines. Similarly failure of Neutral section PTFE rod in Delhi Division/NR is a
cause of concern and be investigated in detail by RDSO.
4.2 Review of important ongoing works:
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
63/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
Page 37
1. A separate plan head for “Traction Distribution (PH-37) has been created (Annexure EEM-8).
Zonal Railways have been advised in this regard vide Board’s letter no. 2011/Elect(G)/148/3
dt. 4.4.12 for bifurcation of works in progress/new works.
2. The Expenditure incurred till March2012 against ongoing sanctioned works (>Rs 2.5 core) with
total cost of Rs.2612.45 crore is Rs1189.74 crore (45.5%). There is a need to prioritise
completion of works which are more than five year old. Zonal railway should specify the
work to be completed during the current financial year.
3. Financial progress for different category of ongoing works is Implantation work- 59%, OHE
Replacement Works -52%, Capacity augmentation Works-34%, Transmission line works -25%,
Green Energy Works-82%, General Power Supply Works-30% & DC to AC conversion work-74
% (Annexure EEM-3).
4.3 New works sanctioned:
1. During 2012-13, electrical works of Rs. 1629.89 crore, the highest ever in all plan head have
been proposed to be sanctioned (OEW-Plan Head-36 - Rs 384.33 cr. + Rs. 430 cr. as JV
partner funding, Staff Amenities – Rs. 6 cr., Passenger Amenities – Rs. 139.23 cr., OSW –
Rs. 2.6 cr., Level Crossing – Rs. 12.1 cr., Workshop – 655.42 cr.). The works sanctioned under
during 2012-13 costing has been sanctioned. The detail of electrical works under different
plan heads is enclosed in Annexure EEM-4.
2. Fund to the tune of Rs. 507 cr., the highest ever allocated under Plan Head 'OEW' in BE 2012-
13 (Annexure EEM-5).
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
64/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
37
3. Order for procurement of 100 escalators has been placed. As per Budget pronouncement 50
escalators are to be provided during 2012-13.The expected commissioning of all 100
escalators is September,2013. The details of contact person of M/s. Johnson has been
forwarded vide letter no. 98/Elect(G)/150/9/Pt.1 dt. 23.3.12. Railways were also advised to
ensure readiness of site in all respect including completion of civil engineering work and
electrical cabling work.
It is proposed to provide additional 221 more escalators at 101 stations. Railways has been
advised vide letter no. 2011/Elect(G)/170/32 dt. 3.4.12 for giving details of these selected
stations for firming of the orders. However, the same is awaited. The list of stations
proposed to provide 100 & 221 escalators is enclosed at Annexure EEM-6.
4. Green Energy works for harnessing of solar energy has been planned in a big way. These
works are –
a) Provision of solar PV modules with battery backup of capacity
(i) 10 KWp at 200 remote railway stations having poor electricity
availability
(ii) 640 Wp at 1000 manned non electrified Level Crossings (LC)
(iii) 100 KWp backup at 20 Administrative Buildings.
Page 38
b) Wind mill plant of 72 MW capacity across different railways (SR-29.5 MW, SCR-
24 MW, SWR-10.5 MW, ICF-7.5 MW, SER-0.5 MW) are being planned in JV mode.
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
65/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
Railways have been advised for giving details of proposed stations & LC gate vide letter no.2012/Elect(G)/150/6 dt. 22.3.12 for further processing.
4.4 Creation of Gazetted & Non-gazetted posts:
i) Non-Gazetted:-
Total 163 posts have been created. Different railways have been advised vide CRB DO letter
no. 2004/Elect(G)/136/2 Pt.II dt 29.11.11 to GM for creation of 50% posts required as per
yardstick for newly opened Railway Electrification routes.
ii) Gazetted:-
M/o Finance, vide their OM dated 11.07.2011, have imposed a complete ban on creation of
Plan & Non-Plan posts, except for new organizations which are set up during the course of
the current year based on already approved schemes.
The details of different posts under process at Board level is enclosed at Annexure–EEM 7.
4.5 Items for discussion
1. Provisions of air conditioning system for –
(a) Electronic equipments room/ relay rooms/relay huts of signaling department etc.
(b) Terminal Management System (TMS)
(c) CMS lobbies
2. Provision of AT supply for remote stations having poor availability of electricity in
electrified territory.
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
66/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
38
Page 39
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
67/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
Electrical (Dev.)
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
68/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
39
Page 40
5.0 Electrical (Dev.)
5.1 Electric Locomotive Factory at Madhepura – For construction of 132/33 kV sub station,
draft agreement with M/s PGCIL and detailed estimate is under finalization in ECR. For rail &
road connectivity work, detailed estimated is under approval at ECR.
(i) Possession of total 1116.66 Acres of land is required. Process of Physical Possession
of land is slow. It is required to be expedited. The work of payment to land losers
should also be expedited. The targets for balance payment, is to be provided.
(ii) Update status and target for award of the work of Elect. Sub Station & other
electrical works, is to be provided.
5.2 Setting up of electric loco assembly & ancillary unit for CLW as department production
unit: Hon’ble MR has approved for setting of ancillary unit of CLW at Dankuni as
departmental Production Unit. Land for the factory has been identified. The work for
construction of the factory is being planned to be executed by RVNL.
E.Rly. is requested to submit the update status and targets for the following
works/activities:
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
69/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
40
(i) Shifting of underground signaling and telecom cables.(ii) Approval of track connectivity plan.
(iii) Shifting of Traction Sub Station & transmission line.
(iv) PERT chart indicating various activities.
5.3 Setting up of the factory for manufacture of IGBT based propulsion equipment for electric
locomotives at Shyamnagar in West Bengal: It is decided to set up a factory for
manufacture of IGBT based propulsion equipment for electric locomotives at Shyamnagar in
West Bengal, on PPP basis. This work has been included in Hon’ble MR’s budget speech
2012-13 and included in the Pink Book, as Item No. 19 of CLW.
5.4 Setting up of electric loco maintenance depot for 9000 HP electric locos at Rewari: This
work has been included in the Pink Book, as Item No. 278 of NWR.
*****
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
70/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
Page 41
ANNEXURES
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
71/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
41
Page 42
ANNEXURE- TRS-I
Details of Misc. Spares sanctioned in Bulk RSP 2012-13
Figure in lakhs.
Sno Item PB no
item no
Alloc Anticipiated Cost
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
72/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
of 11-12 CAP DRF1 MTR of 38 electric locos at DHD @ Rs 110
lakh each.1106 DRF 0 4180
2 Provision of 75 nos static invertor for
electic locos @ Rs. 33.76 lakh each.1107 CAP 2532 0
3 Provision of Crew friendly cab with air
conditioning on 50 electric locos @ Rs.
14.5 lakh each.
1108 DRF 0 725
4 Rehablitation of 50 nos tap changers on
conventional electric locos @ Rs. 10 lakh
each.
1109 DRF 0 500
5 Provision of 150 nos tri-plate panel
electric locos @ Rs. 5.6 lakhs .1110 CAP 840 0
6 Provision of 120 nos Microprocessor
based control and fault diagnostic sytem
on electric locos @ Rs. 6.22 lakhs.
1111 CAP 746.4 0
7 Reht. Of 30 sets of PCB Cards for 3 ph. Locos
@ Rs. 9.0 lakh / loco set. 1112 DRF 0 270
8 Repair cum Reconditioning of 20 loco sets of
PCB cards of 3 Ph. Locos @ Rs. 47 lakh/set. 1113 DRF 0 940
9 Acquisition of Hall effect speed sensor system
for adhesion control of 100 nos 3 Ph. Locos @
Rs. 5.6 lakh/loco set.1114 CAP 560 0
10 DC link voltage sensor module for power
converters for 400 nos 3 Ph. Locos @ Rs. 6.0
lakh /loco set.1115 DRF 0 2400
11 Reht.cum reconditioning of 25 nos TM
stators and 75 rotors of 3 Ph. Locos @ Rs. 9.5
lakh & 5.75 lakh respectively.1116 DRF 0 668.75
12 Provision of newly developed Driver’s display
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
73/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
42
in 100 electric locos @ Rs. 7.95. lakh each. 1117 CAP 795 0
13 Remote monitoring of 100 nos 3 ph. Locos @
Rs. 7.0 lakh each. 1118 CAP 700 0
14 Provision of 150 nos Single bottle Vacuum
circuit breakers on elect. Locos @ Rs. 2.82
lakh each.
1119 DRF 0 423
Page 43
15 Provision of 09 loco sets of Hurth coupling for
WAP5 elect. Locos @ Rs. 30 lakh / loco set. 1120 DRF 0 270
16 Provision of 08 loco sets of Gear case for
WAP5 elect. Locos @ Rs. 75 lakh / loco set. 1121 DRF 0 600
17 Provision of 50 sets of Locotrol system on
electric locos @ Rs. 38 lakh/set. 1122 CAP 1900 0
18 145 sets of spares for for Static inverters @
Rs. 9.0 lakh / set. 1123 DRF 0 1305
19 Set of spares for 12 nos 3 ph elect.locos @ Rs.
335 lakh/set. 1124 CAP 4020 0
20 Provision of 50 nos High capacity Oil free
compressors for WAP4 elect. Locos @ Rs. 6.5
lakh each.1125 DRF 0 325
21 Provision of 10 nos Aluminum tank for
transformer of 3 ph elect. Locos @ Rs. 35.8
lakh each.1126 DRF 0 358
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
74/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
43
22 Provision of 20 sets of Spares for SIVs of ACDC locos @ Rs. 8.0 lakh / set. LB CAP 160 0
23 100 nos Bolster for WAP-4 /WAP1 electric
locos @ Rs. 3.3 lakh each. 1127 DRF 0 330
24 Re-conditioning cum repair of100 valve sets
of traction converters for 3 ph. Locos @ Rs.
4.5 lakh.
1128 DRF 0 450
25 Prov. Of 1000 nos high reach pantographs for
electric locos @ Rs. 4.0 lakh each. 1129 CAP 4000 0
Total 16253.4 13744.75
29998.15
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
75/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
Page 44
Annexure- TRS-II
Details of Capital Spares sanctioned in Bulk RSP 2012-13
Figure in lakhs.
SNo Item PB no
item no
of 11-12
Alloc Anticipiated Cost
CAP DRF
1 12 nos Traction Motor Hitachi for elect.
Locos @ Rs. 24.42 lakh each. 1130 CAP 305.04 0
2 27 nos Wheel sets with axle box for
WAP4/WAG7 locos @ 6.6 lakh each LB CAP 178.2
3 02 nos Transformers for three phase elect.
Locos @ Rs. 125 lakh per unit. 1131 CAP 250 0
4 Provision of 18 nos vlalve sets ZV+ZV for
elect. Locos @ Rs. 14 lakh each.1132 CAP 252 0
5 03 nos traction converters for three ph.
Locos @ Rs. 125 lakh each. 1133 CAP 375 0
6 03 nos auxillary converters (loco sets) for
3 ph. Locos @ Rs. 83.5 lakh per set. 1134 CAP 250.5 0
7 04 nos bogie frame for WAP7/WAG9 3 ph.
Locos.@ Rs.27 lakh each. LB CAP 108 0
8 02 nos bogie frame with brake rigging for
WAP5 3 ph. Locos.@ Rs.16.5 lakh. LB CAP 33 0
9 24 Nos wheel sets for WAP7/WAG9 3 ph.
locos @ Rs.9.0 lakh per unit. LB CAP 216 0
10 06 Nos wheel sets for WAP5 three phase
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
76/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
44
locos @ ` 9.0 lakh each LB CAP 54 011 12 nos TM rotors for WAP7/WAG9 elect.
locos@ Rs. 10.0 lakh each. LB CAP 120 0
12 03 nos TM stators for WAP5 electric locos.
@ ` 10 lakh each.LB CAP 30 0
13 12 Nos TM rotor for three ph. Locos @
Rs. 6.5 lakhs per unit.LB CAP 78 0
14 03 nos TM rotors for WAP5 electric locos.
@ ` 6.5 lakh.LB CAP 19.5 0
15 06 Nos valve sets ZV+MV @ Rs 12.5 lakhs
per unit. LB CAP 75 0
16 02 set Control Electronics (loco set)
control, conv. & Aux. converter @ Rs. 34.5
lakhs per unit.
LB CAP 69 0
17 03 Nos E-70 brake system unit panel with
valve @ Rs. 32 lakh per unit LB CAP 96 0
Total CAP2509.24 0
2509.24
Page 45
Annexure-TRS-III
Details of Items sanctioned in IRSP 2012-13
Total
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
77/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
Rly. Item Alloc Qty. Rate cost
CR
High adhesion fabricated bogies with brake rigging
for WCAM3 / WCAG1 type AC/DC locos. 02 nos @
Rs.10.53 lakh each.
CAP 2 1053 2106
ER
Modification of 25 nos SL-30 for fire protected
measure as per RDSO's SMI no 240(Rev.0) 25 nos
@ Rs.4.612 lakh each
DRF 25 461.2 11530
Replacement of 05 nos Hitachi Traction Motor @
Rs. 23.87 lakh each.DRF 5 2387 11280
ECR
Motorized Bogie with brake rigging, Axle and
complete Hiachi TM for WAP-4 locos.02 nos @ `
80.84 lakh each.
CAP 2 8084 16168
Capcitor MSR type complete with connector &
clamp for DC damping panel.630 nos @ ̀.02424
lakh each.
DF-3 630 243 1527
Gate unit for three phase loco.30 nos @ ̀0.935 lakh
each.DRF 30 93.5 2805
Wheel set with Axle box assembly complete with
roller bearing for WAG-7 locos.10 sets @ ̀1.105
lakh per set.
CAP 10 110.5 1105
Bull gear & Pinion (21:107) teeth, 9 loco sets
(9x6=54 nos)@ ̀2.04 lakh eachDRF 54 204 11016
RSI panel for WAG-7 locos. 02 loco set (04 nos)@ `
10.52 lakh per set.DRF 2 1052 2104
ECoR
Main Transformer 5400 KVA for WAG-7 electric
locos at ELS/Angul.01 nos @ Rs. 32.43 lakh each.CAP
1 32433243
Silicon rectifier clock panel (Compact type) for
WAG-7 electric locos at ELS/Angul. 01 nos @ Rs.
8.07 lakh each.
CAP
1 807
807
AC MVRF with DBRs’ for electric locos at ELS/VSKP.
08 nos @ Rs. 7.34 lakh each.DRF
8 7345872
Transformer-5400 KVA for WAP-4 electric locos at
ELS/GZB. 01 nos @ Rs. 32.43 lakh each.CAP
1 32433243
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
78/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
45
NR Transformer-5400 KVA for electric locos at ELS/LDH.01 nos @ Rs. 32.43 lakh each CAP 1 3243 3243
Oil cooling radiator for three phase loco at ELS/GZB,
10 nos @ Rs. 4.23 lakh each.DRF
10 4234230
NCR NIL
SR
Up-gradation of 35 nos smoothing reactor type SL-
30 of Electric locos@ Rs. 3.88 lakh each.DRF 35 388 13580
Up gradation of 50 loco sets existing 1000 Amp.
capacity CTFs with 1500 Amp. capacity CTFs for
elect. Locos.@ Rs. 2.74 lakh per loco set.
DRF 50 274 13700
Provision of 81 nos of Vigilance Control Device
system for conventional electric locos. 81 nos @ Rs.
0.913 lakh each.
CAP 81 91.3 7395
Page 46
Up gradation of existing 1000 Amp reversers with
1500 Amp. capacity on elect. Locos for SEL/AJJ. 15
nos @ Rs. 0.822 lakh each.
DRF 15 82.2 1233
Compact size Silicon Rectifier block for
WAP4/WAG7 Locos, 01 loco sets(02 nos) @ Rs.
14.61 lakh per loco set.
CAP 1 1461 1461
Up gradation of existing 1000 Amp reversers with
1500 Amp. capacity on elect. Locos for ELS/ED, 40
nos @ Rs. 0.822 lakh each.
DRF 40 82.2 3288
Up-gradation of conv. speedometers with ESMONs
in electric locos for ELS/ED, 24 nos @ Rs. 0.64 lakh
each.
DRF 24 64 1536
Provision of 1000 LPM capacity CP with motor, air
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
79/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
reservoir and all other accessories for WAP4 locosfor ELS/ED.11 nos @ Rs. 2.97 lakh each.
CAP 11 297 3267
Up gradation of existing 1000 Amp reversers with
1500 Amp. capacity on elect. Locos for ELS/RPM,15
nos @ Rs. 0.822 lakh each.
DRF 15 82.2 1233
Up gradation of existing 1000 Amp. capacity CTFs
with 1500 Amp. capacity CTFs for elect. Locos for
ELS/RPM 8 loco sets @ Rs. 2.74 lakh per loco set.
DRF 8 274 2192
SCR
Provision of loco main Transformer type HETT-5400
KVA for elect. Locos. for ELS/BZA., 01 nos @ Rs. 24.0
lakh each.
CAP 1 2400 2400
Set of cross bar assembly (stainless steel fabricated)
for SL-30 smoothing reactor for locos at ELS/KZJ.40
nos @ Rs. 0.31525 lakh each
CAP 40 31.53 1261
10KVA Gapless Surge Arresters with Porcelain
housing for elect. Locos at ELS/KZJ. 100 nos @ Rs.
0.2784 lakh each.
CAP 100 27.84 2784
Manufacturing & supply of assembled wheel sets
for WAG-7 electric locos for ELS/BZA.06 sets @ Rs.
5.1933 lakh per set.
CAP 6 519.33 3116
Set of modified pins & nylatron bushes for WAG-7
locos for ELS/KZJ. 30 sets @ Rs. 0.5434 lakh per set.CAP 30 54.34 1630
Compact type rectifier unit for WAG-7 locosas per
spec. no ELRS/Spec/RS/030 with amendment. (01
nos @ Rs. 8.07 lakh each.
CAP 1 907 807
SER
Provision of Cable Head Termination for electric
locos at ELS/TATA. 40 nos @ Rs. 1.673 lakh eachDRF 40 167.3 6692
Conversion & retro fitment of 42 KW DCMVRF into
40 KW three phase AC MVRF. 10 nos @ Rs. 2.036
lakh each
DRF 10 203.6 2036
SECR
Procurement of 02 nos compact type rectifier block
for WAG-7 locos.@ Rs. 8.07 lakh each.DRF 2 807 1614
Procurement of 06 nos assembled bogies for WAG-
7 locos with brake rigging, cylinder & pn. pipe lines CAP 6 596 3576
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
80/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
46
@ Rs. 5.96 lakh.
Procurement of 05 nos Air dryer for electric locos.@
Rs. 1.532 lakh each.CAP 5 153.2 766
Page 47
WR NIL
WCR
High capacity 1500 Amp reversers as per RDSO SMI
no ELRS/SMI/0234 (REV0) for ELS/NKJ. 25 nos @ Rs.
1.0396 lakh each.
DRF 25 103.96 2599
Procurement of Slave unit(Electronic speed cum
energy indicator) for SPM with intern memory of 03
hrs with connecting cables for ELS/NKJ. 45 nos @
Rs.0.9835 lakh.
DRF 45 98.35 4426
Procurement of compact type Silicon Rectifier block
for ELS/ET.08 nos @ Rs.8.07 lakh each.DRF 8 807 6456
Procurement of Slave unit(Electronic speed cum
energy indicator) for SPM with intern memory of 03
hrs with connecting cables for ELS/TKD. 62 nos @
Rs. 0.9845 lakh.
DRF 62 98.45 6104
Set of 1500 Amp capacity CTF 1,2&3 as per RDSO
SMI no ELRS/SMI / 0234 (REV0). Each set consists of
02 items, 03 nos (i) CTF-1&2-02 nos (ii) CTF3-01 nos
for ELS/NKJ. 25 sets @ Rs. 2.8288 lakh per set.
DRF 25 282.88 7072
Procurement of 1500 Amp reversers for ELS/TKD as
per RDSO SMI no 0234. 25 loco sets @ Rs. 3.12 lakh
per set.
DRF 25 312 7800
Total 190303
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
81/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
47
5/1/12 I N D E X Sno Item Page no. 1.0 ELECTRIC (LOCO) 1.1 Punctuality performance 4 1.1.1 Reliability of electric locos 4 1.1.2 Inc
82/82webcache.googleusercontent.com/search?q=cache:VAuQm93o-xUJ:elocos.railnet.gov.in/MailBox/Agenda_CEEs_Meeting21%2622.4.1…
Page 48Page 49Page 50Page 51Page 52Page 53Page 54Page 55Page 56Page 57Page 58Page 59Page 60Page 61Page 62Page 63Page 64Page 65Page 66Page 67Page 68Page 69Page 70Page 71Page 72