Sharq Crossing Programme Email Date Reference Project Title

11
From Manager of Contracts Department To Interested Party – Sharq Crossing Programme Email Date Reference ϑΗΎϫ : 44950077 (+)-αϛΎϓ 44950780 Tel. (+ 974) 44950077- Fax (+ 974) 44950780- P.O.Box 22188 Project Title: Sharq Crossing: Construction Works and Operations & Maintenance Projects Expression of Interest for Sharq Approach & Bridge West Bay Approach & Bridge Cultural City Approach & Bridge Immersed Tube Tunnels Land Based Enabling Works Marine Based Enabling Works Systems Integration Surface Street Modifications Operations & Maintenance [delete as appropriate] Dear Sir, The Public Works Authority (hereinafter called “the Authority”), invites companies with relevant and recent experience in delivering: 1. Large scale complex infrastructure projects in a Design & Build Environment: a. Sharq Approach & Bridge b. West Bay Approach & Bridge c. Cultural City Approach & Bridge d. Immersed Tube Tunnels 2. Land based enabling works including utility relocation procured under a construct only model. 3. Marine based enabling works, including dredging, procured under a construct only model.Systems Integration within large scale infrastructure projects procured under a construct only model. 4. Surface Street modification procured under a construct only model. 5. Operation and Maintenance of large scale infrastructure projects. To register their interest to be considered for the Pre Qualification process for the above captioned project.

Transcript of Sharq Crossing Programme Email Date Reference Project Title

From Manager of Contracts DepartmentTo Interested Party – Sharq Crossing ProgrammeEmail

DateReference

Mega Projects : 44950077 (+)- 44950780Tel. (+ 974) 44950077- Fax (+ 974) 44950780- P.O.Box 22188

Project Title: Sharq Crossing: Construction Works and Operations & Maintenance Projects

Expression of Interest for Sharq Approach & BridgeWest Bay Approach & BridgeCultural City Approach & BridgeImmersed Tube Tunnels Land Based Enabling WorksMarine Based Enabling WorksSystems IntegrationSurface Street ModificationsOperations & Maintenance

[delete as appropriate]

Dear Sir,

The Public Works Authority (hereinafter called “the Authority”), invites companies with relevant and recent experience in delivering:

1. Large scale complex infrastructure projects in a Design & Build Environment:a. Sharq Approach & Bridgeb. West Bay Approach & Bridgec. Cultural City Approach & Bridged. Immersed Tube Tunnels

2. Land based enabling works including utility relocation procured under a constructonly model.

3. Marine based enabling works, including dredging, procured under a construct onlymodel.Systems Integration within large scale infrastructure projects procured undera construct only model.

4. Surface Street modification procured under a construct only model.

5. Operation and Maintenance of large scale infrastructure projects.

To register their interest to be considered for the Pre Qualification process for the above captioned project.

Mega Projects : 44950077 (+)- 44950780Tel. (+ 974) 44950077- Fax (+ 974) 44950780- P.O.Box 22188

Once Expressions of Interest data is collected and confirmed from Applicants, Pre qualification documents for specific projects will be available.

The Authority is aware that due to the scope of works for the project, the successful participant may need to use an association or joint venture to ensure that a multi-disciplinary team is established to fulfil the scope of works required and Qatari registration is fulfilled.

The Authority seeks your written confirmation that you are interested in participating in this process by the completion of the attached Expression of Interest Acknowledgement Form and the attached Anti-Corruption and Confidentiality Declaration. Both documents are to be returned, without amendment or caveat, on or before by no later than (Qatar time) in soft copy by uploading the completed forms and by delivering a hard copy to:

Public Works AuthorityPO Box 22188

DohaState of Qatar

Attention: Manager of Contracts Department

Re: Sharq Crossing: Sharq Approach & Bridge.

West Bay Approach & Bridge.

Cultural City Approach & Bridge.

Immersed Tube Tunnels.

Land Based Enabling Works.

Marine Based Enabling Works.

Systems Integration.

Surface Street Modifications.

Operations & Maintenance.

[delete as appropriate]

We look forward to your response and thank you for your interest in this Programme.

Yours Faithfully

Contracts Department ; PMC – Sharq Crossing; Contract Control (CD) ; Tender File

Copy To :

Encl: Expression of Interest Acknowledgement Form (2 x A4 pages) Anti-Corruption and Confidentiality Declaration – Specimen Form (2 x A4 pages)

STATE OF QATAREXPRESSION OF INTEREST ACKNOWLEDGEMENT FORM

PUBLIC WORKS AUTHORITY

Project Title:

Sharq Crossing Programme: Sharq Approach & BridgeWest Bay Approach & BridgeCultural City Approach & BridgeImmersed Tube Tunnels Land Based Enabling WorksMarine Based Enabling WorksSystems Integration.Surface Street ModificationsOperations & Maintenance

[delete those projects which the organisation does not want to be considered for]

We ……………………………………………………………………….. hereby acknowledge receiptof the Expression of Interest Document for the above noted project.

Please be informed that: We confirm that we are interested in the above project(s) and is successful would wish to submit a Prequalification Application.

We confirm that the primary and secondary contact details of the persons that should be issued with or copied in all correspondence relating to this Expression of Interest or Prequalification Application are as follows:Primary Contact:Name: ………………………………………………………………………………….. Title: ………………………………………………………………………………….. Email: ………………………………………………………………………………….. Contact No ………………………………………………………………………………….

Secondary Contact:Name: …………………………………………………………………………………..Title: ………………………………………………………………………………….. Email: ………………………………………………………………………………….. Contact No …………………………………………………………………………………..

If successful we would wish to be considered for the following projects in the priority order listed below: [list in order of priority the projects that the organisation completing this form wishes to be considered for using the project titles listed in the Project title box above. Organisation can list more than one project at this time]

EOISharq Crossing Programme – Construction and O&M Contracts March 2014

Jean-Philippe SALLA

Operations Manager

[email protected] / [email protected]

+974 4453 8400

ILyoung Choi

General Manager

[email protected] / [email protected]

+974 4479 4134

QDVC - DAEWOO E&C Joint Venture

1. Immersed Tube Tunnel2. Cultural City Approach & Bridge