September 3, 2020 3:00 PM Welcome to the City of St. Petersburg ...

219
September 3, 2020 3:00 PM Welcome to the City of St. Petersburg City Council Meeting. A copy of the City Council agenda and all supporting documents is available on the City’s website at www.stpete.org/council or by emailing [email protected]. NOTE: City buildings are closed to the public due to the COVID-19 emergency. Accordingly, the meeting location has been changed from in-person to a “virtual” meeting by means of communications media technology pursuant to Executive Order Number 20-69, issued by the Governor on March 20, 2020, and Executive Order 2020-30 issued by the Mayor on July 8, 2020. The public can attend the meeting in the following ways: Watch live on Channel 15 WOW!/Channel 641 Spectrum/Channel 20 Frontier FiOS Watch live online at www.stpete.org/TV Listen and participate by dialing one of the following phone numbers o +1 312 626 6799 or o +1 646 876 9923 or o +1 253 215 8782 or o +1 301 715 8592 or o +1 346 248 7799 or o +1 669 900 6833 and entering webinar ID: 964 0338 6033# Watch, listen, and participate on your computer, mobile phone, or other device by visiting the following link: https://zoom.us/j/96403386033 The public can participate in the meeting by providing public comment in the following ways: Send an email to [email protected] with your name, address, agenda item and comment. If attending the Zoom meeting by computer or other device, use the “raise hand” button in the Zoom app. If attending the Zoom meeting by phone only, enter *9 on the phone to use the “raise hand” feature. In the event the meeting is held in-person parties may appear at City Hall at 175 5 th St. North, St. Petersburg, Fl 33701. Please check the City’s website before attending the meeting. The “raise hand” feature in the Zoom meeting indicates your desire to speak but does not allow you to speak immediately. You must use the “raise hand” feature at the time the agenda item is addressed. All “raised hands” will be lowered after each agenda item. When it is your turn to speak, your microphone will be unmuted. At the conclusion of your comments or when you reach the three-minute limit, you will be muted. Please be advised that at all times the chair has the

Transcript of September 3, 2020 3:00 PM Welcome to the City of St. Petersburg ...

September 3, 2020 3:00 PM

Welcome to the City of St. Petersburg City Council Meeting. A copy of the City Council agenda and all supporting documents is available on the City’s website at www.stpete.org/council or by emailing [email protected]. NOTE: City buildings are closed to the public due to the COVID-19 emergency. Accordingly, the meeting location has been changed from in-person to a “virtual” meeting by means of communications media technology pursuant to Executive Order Number 20-69, issued by the Governor on March 20, 2020, and Executive Order 2020-30 issued by the Mayor on July 8, 2020. The public can attend the meeting in the following ways:

• Watch live on Channel 15 WOW!/Channel 641 Spectrum/Channel 20 Frontier FiOS • Watch live online at www.stpete.org/TV • Listen and participate by dialing one of the following phone numbers

o +1 312 626 6799 or o +1 646 876 9923 or o +1 253 215 8782 or o +1 301 715 8592 or o +1 346 248 7799 or o +1 669 900 6833 and entering webinar ID: 964 0338 6033#

• Watch, listen, and participate on your computer, mobile phone, or other device by visiting the following link: https://zoom.us/j/96403386033

The public can participate in the meeting by providing public comment in the following ways: • Send an email to [email protected] with your name, address, agenda item and

comment. • If attending the Zoom meeting by computer or other device, use the “raise hand” button

in the Zoom app. • If attending the Zoom meeting by phone only, enter *9 on the phone to use the “raise

hand” feature.

In the event the meeting is held in-person parties may appear at City Hall at 175 5th St. North, St. Petersburg, Fl 33701. Please check the City’s website before attending the meeting.

The “raise hand” feature in the Zoom meeting indicates your desire to speak but does not allow you to speak immediately. You must use the “raise hand” feature at the time the agenda item is addressed. All “raised hands” will be lowered after each agenda item. When it is your turn to speak, your microphone will be unmuted. At the conclusion of your comments or when you reach the three-minute limit, you will be muted. Please be advised that at all times the chair has the

authority and discretion to re-order agenda items, and in the event the meeting is disrupted by violations of the rules of decorum, to accept public comment by alternate means, including by email only. Regardless of the method of participation used, normal rules for participation apply, including the three-minute limit on comments, the requirement that any presentation materials must be submitted to the City Clerk in advance of the meeting, and the rules of decorum. Public comments submitted in writing by email will be read during Open Forum unless an agenda item has been specified. Public comments must be submitted before the public comment period has closed. Closed captioning is provided during the livestream of the City Council meeting at www.stpete.org/meetings. If you are deaf/hard of hearing and require the services of an interpreter, please call our TDD number, 892-5259, or the Florida Relay Service at 711 as soon as possible. The City requests at least 72 hours advance notice, prior to the scheduled meeting, and every effort will be made to provide that service for you. If you are a person with a disability who needs an accommodation in order to participate or have any questions, please contact the City Clerk’s Office at 893-7448.

Additional information can be found on the City’s website at www.stpete.org/meetings or by contacting the City Clerk by email at [email protected], by phone at 893-7448, or by mail at City Clerk, P.O. Box 2842, St. Petersburg, FL 33731.

2

September 3, 2020

3:00 PM A. Meeting Called to Order and Roll Call.

Invocation and Pledge to the Flag of the United States of America.

A moment of silence will be observed to remember fallen Firefighters and Police Officers

of the City of St. Petersburg that lost their lives in the line of duty during this month:

Constable Edward A. George - September 16, 1908

Officer Charles Lee Eustes - September 24, 1967 B. Approval of Agenda with Additions and Deletions.

C. Consent Agenda (see attached)

Open Forum

The City Council receives public comment during Open Forum and on agenda items with limited exceptions consistent with Florida law. All issues discussed under Open Forum must be limited to issues related to the City of St. Petersburg government. Only City residents, owners of property in the City, owners of businesses in the City or their employees may speak during Open Forum.If you wish to address City Council, you may send an email to [email protected] with your name, address, agenda item number, and comment. Unless an agenda item is specified, emails will be read during Open Forum. Otherwise, emails will be read during public comment for the specified agenda item. Emails must be received before the public comment period for the agenda item has closed.If you wish to address City Council through the Zoom meeting, you must use the “raise hand” feature button in the Zoom app or enter *9 on your phone at the time the agenda item is addressed. When it is your turn to speak, you will be unmuted and asked to state your name and address. At the conclusion of your comments or when you reach the three-minute time limit, you will be muted. All “raised hands” will be lowered after each agenda item.Regardless of the method of participation used, normal rules apply, including the three-minute time limit on comments, the requirement that any presentation materials must be submitted in advance of the meeting and the rules of decorum. If live public comment is disrupted by violations of the rules of decorum, the chair is authorized to accept public comment by alternate means, including by email only.

D. New Ordinances - (First Reading of Title and Setting of Public Hearing)

E. Reports

1. COVID-19 Update

2. Pier Report [DELETED]

3. Approving three-year blanket purchase agreements with Insituform Technologies, LLC,

BLD Services, LLC and LMK Pipe Renewal, LLC for SAN Priority Area CIPP - FY20

(20048-111), for the Water Resources Department, at an estimated cost of $3,750,000 for

FY20, and an estimated three-year total not to exceed $11,750,000 (Engineering Project

No. 20048-111).

4. Approving three-year blanket purchase agreements with SAK Construction, LLC, LMK

Pipe Renewal, LLC, and BLD Services, LLC for SAN Annual CIPP Pipe Lining FY20,

for the Water Resources Department, at an estimated cost of $3,465,000 for FY20, and an

estimated three-year total, not to exceed $11,465,000 (Engineering Project No. 20013-

111).

3

5. Approving the First Amendment to the Architect/Engineering Agreement between the

City of St. Petersburg, Florida and Black & Veatch Corporation (A/E), dated February 28,

2019, for A/E to provide continued project administration, final design, permitting, and

Envision assessment (including application package and preparation) related to the

NEWRF Electrical Distribution System Improvements Project in an amount not to exceed

$2,075,926; providing that the total contract amount shall not exceed $2,263,106;

authorizing the City Attorney's Office to make non-substantive changes to the First

Amendment; authorizing the Mayor or his designee to execute the First Amendment; and

providing an effective date (ECID Project No. 18121-111, Oracle No. 16384)

F. New Business

1. Referring to the Public Services & Infrastructure Committee (PS&I) for an update from

City and PSTA staff on potential locations for new and replacement shelters at the

September 10 PS&I committee meeting. (Councilmember Rice)

2. Referring to PS&I or other relevant committee for a discussion on office space

development throughout the City of St. Petersburg. (Councilmember Gabbard)

3. Requesting Legal give an update to City Council on the upcoming Charter Review

Commission at the September 24, 2020 Committee of the Whole meeting. (Chair

Montanari)

G. Council Committee Reports

1. Authorizing the issuance of a not to exceed $3,000,000 Non-Ad Valorem Revenue Note,

Series 2020A to finance the costs of the acquisition, design, construction, reconstruction,

and equipping of capital improvements to various projects located within the City limits,

and to pay associated transactional costs; providing that such note shall be a limited

obligation of the city payable solely from non-ad valorem revenues budgeted and

appropriated as provided herein; providing for the rights, securities and remedies for the

owner of such note; making certain covenants and agreements in connection therewith.

2. A Resolution of the City Council of the City of St. Petersburg, Florida supporting the

establishment of an independent St. Petersburg Food Policy Council (“Food Policy

Council”) by the Foundation for a Healthy St. Petersburg.

H. Legal

I. Public Hearings and Quasi-Judicial Proceedings - 5:01 P.M.

Public Hearings

1. Authorizing the Mayor or his designee to accept a grant from the U.S. Department of

Housing and Urban Development (“HUD”) in the amount of $2,902,139 for the

Emergency Solutions Grant Coronavirus (“ESG-CV-2”) funding to prevent, prepare for

and respond to the Coronavirus (COVID-19) pandemic which addresses the unique needs

of low- and moderate income individuals; approving a substantial amendment to the FY

2019/20 Annual Action Plan (“Amendment”) in the amount of $2,902,139 to add projects

to fund with ESG-CV-2 and to expedite the use of these resources to address the COVID-

19 crisis; approving a supplemental appropriation in the amount of $2,902,139 from the

increase in the unappropriated balance of the Emergency Solutions Grant Fund (1112),

resulting from additional revenue to be received during FY 2019/20, to the Housing and

4

Community Development Department, Administration Division (082-1089); authorizing

the Mayor or his designee to submit the substantial amendment of the FY 2019/20 Annual

Action Plan to the U.S. Department of Housing and Urban Development (“HUD”); to

execute all documents necessary to effectuate these transactions.

2. FY21 Utility Rates

(a) Ordinance 442-H relating to sanitation rates and charges; amending Chapter 27,

Section 27-557 of the St. Petersburg City Code; amending rates and charges for

sanitation services; providing for severability of provisions; providing an explanation

of words struck through and underlined; establishing date to begin calculating new

rates for billing purposes.

(b) Ordinance 441-H relating to utility rates; amending Chapter 27, Subsection 405(b)(1)

and (2) of the St. Petersburg City Code; amending the stormwater utility fee;

amending the tiered rate structure fees for single family residential parcels; providing

for severability of provisions; providing an explanation of words struck through and

underlined; establishing a date to begin calculating new rates for billing purposes.

(c) Ordinance 440-H relating to utility rates and charges; amending Chapter 27,

Subsections 27-141 (a), 27-142 (a), 27-144 (c), 27-146 (d), 27-283 (a), 27-284 (a), and

27-284 (d) of the St. Petersburg City Code; amending base and volume charges for

water service; amending wholesale water service charges for the City of Gulfport;

amending base and volume charges for irrigation only accounts; amending monthly

charges for commercial water only accounts; amending base and volume charges for

wastewater service; amending wastewater service charges for wholesale customers;

providing for severability of provisions; providing an explanation of words struck

through and underlined; establishing a date to begin calculating new rates for billing

purposes.

First Reading and First Public Hearings

Setting September 17, 2020, 6:00 P.M. as the public hearing date for the following proposed

Ordinance(s):

3. Fiscal Year 2021 Tentative Budget and Proposed Millage Rate

(a) Resolution adopting a proposed millage rate for the fiscal year ending September 30, 2021.

(b) Ordinance 432-H making appropriations for the Fiscal Year ending September 30,

2021; making appropriations for the payment of the operating expenses of the City

of St. Petersburg, Florida, including its utilities, and for the payment of principal and

interest of revenue bonds, and other obligations of the City of St. Petersburg, Florida;

making appropriations for the Capital Improvement Program of the City of St.

Petersburg, Florida; making appropriations for the Dependent Special Districts of the

City of St. Petersburg Florida; adopting this appropriations ordinance as the budget

for the City of St. Petersburg, Florida for the Fiscal Year ending September 30,

2021; providing for related matters.

(c) Resolution adopting the tentative budget for the Fiscal Year ending September 30, 2021.

J. Open Forum

5

K. Adjournment

A

Consent Agenda A

September 3, 2020

NOTE: Business items listed on the yellow Consent Agenda cost more than one-half million dollars while

the blue Consent Agenda includes routine business items costing less than that amount.

(Procurement)

1. Approving three-year blanket purchase agreements with Insituform Technologies, LLC,

BLD Services, LLC and LMK Pipe Renewal, LLC for SAN Priority Area CIPP - FY20

(20048-111), for the Water Resources Department, at an estimated cost of $3,750,000 for

FY20, and an estimated three-year total not to exceed $11,750,000 (Engineering Project

No. 20048-111). [MOVED TO REPORTS AS E-3]

2. Approving three-year blanket purchase agreements with SAK Construction, LLC, LMK

Pipe Renewal, LLC, and BLD Services, LLC for SAN Annual CIPP Pipe Lining FY20,

for the Water Resources Department, at an estimated cost of $3,465,000 for FY20, and an

estimated three-year total, not to exceed $11,465,000 (Engineering Project No. 20013-

111). [MOVED TO REPORTS AS E-4]

3. Approving the renewal of blanket purchase agreements with Cross Construction Services,

Inc., Cross Environmental Services, Inc., H&H Fergusons’ Contracting, Inc., John Varrati,

LLC, dba Magnum Demolition, Johnsons’ Excavation & Services, Inc., Kimmins

Contracting Corp., and PAW Materials, Inc., dba PAW Demolition, for demolition

services and removal of structures for the Codes Compliance Assistance and Engineering

and Capital Improvements departments; at an estimated annual cost of $345,000 per year,

for a total contract amount of $1,725,000.

(City Development)

(Leisure Services)

(Public Works)

4. Approving the First Amendment to the Architect/Engineering Agreement between the

City of St. Petersburg, Florida and Black & Veatch Corporation (A/E), dated February 28,

2019, for A/E to provide continued project administration, final design, permitting, and

Envision assessment (including application package and preparation) related to the

NEWRF Electrical Distribution System Improvements Project in an amount not to exceed

$2,075,926; providing that the total contract amount shall not exceed $2,263,106;

authorizing the City Attorney's Office to make non-substantive changes to the First

Amendment; authorizing the Mayor or his designee to execute the First Amendment; and

providing an effective date (ECID Project No. 18121-111, Oracle No. 16384) [MOVED

TO REPORTS AS E-5]

(Appointments)

(Miscellaneous)

6

Consent Agenda B

September 3, 2020

NOTE: The Consent Agenda contains normal, routine business items that are very likely to be approved by

the City Council by a single motion. Council questions on these items were answered prior to the meeting.

Each Councilmember may, however, defer any item for added discussion at a later time.

(Procurement)

1. Approving an increase in allocation for earthwork, grading and drainage services with

Joseph Bryant Landscaping and Site Work Event Planning, LLC, for the Engineering and

Capital Improvements and Parks and Recreation departments, in the amount of $155,000,

for a total contract amount of $405,000.

2. Approving the purchase of one (1) wheel loader from Great Southern Equipment

Company for the Stormwater, Pavement and Traffic Operations Department, at a total cost

of $212,589.30.

3. A resolution accepting a bid from American Lighting and Signalization, LLC. for the

West End Fire Station #2, in the amount of $189,652; rescinding an unencumbered

appropriation in the City Facilities Capital Improvement Fund (3031) in the amount of

$86,000 from the Infrastructure TBD FY20 Project (17231); approving a supplemental

appropriation in the amount of $86,000 from the increase in the unappropriated balance of

the City Facilities Capital Improvement Fund (3031), resulting from the above rescission,

to the Fire Station #2 Project (17132); and providing an effective date.

4. Acknowledging the selection of Biltmore Construction Co., Inc. (“Biltmore”) as the most

qualified firm to provide preconstruction and construction phase services for the Corridor

Improvements along 22nd Street South from 1st Avenue South to 11th Avenue South

Project; authorizing the Mayor or his designee to execute a Construction Manager at Risk

Agreement with a Guaranteed Maximum Price between the City of St. Petersburg, Florida

and Biltmore; authorizing the City Attorney’s Office to make non-substantive changes to

the Construction Manager at Risk Agreement with a Guaranteed Maximum Price;

authorizing payment to Biltmore in an amount not to exceed $50,600 for preconstruction

phase (ECID Work Order No. 19067-119 and 19067-219; Oracle Project Nos 17589).

(City Development)

5. Approving an agreement between the City of St. Petersburg and Rowdies Soccer, LLC for

the management, maintenance and operation of Al Lang Stadium with a one-year term

commencing on December 1, 2020.

(Leisure Services)

(Public Works)

(Appointments)

7

(Miscellaneous)

6. Housing, Land Use & Transportation Committee Report (8/13/2020)

7. Legislative Affairs and Intergovernmental Relations Committee Report (8/13/2020)

8. Health, Energy, Resiliency & Sustainability Committee Report (8/27/2020)

9. Budget, Finance & Taxation Committee Report (8/27/2020)

9

Board and Commission Vacancies

Civil Service Board

2 Alternate Members

((Terms expires 8/31/22 and 11/30/22))

Nuisance Abatement Board

1 Regular Member

((Term expires 12/31/22))

Nuisance Abatement Board

2 Alternate Members

((Terms expire 8/31/22 and 11/30/22))

11

The following page(s) contain the backup material for Agenda Item: Approving three-year blanket

purchase agreements with Insituform Technologies, LLC, BLD Services, LLC and LMK Pipe

Renewal, LLC for SAN Priority Area CIPP - FY20 (20048-111), for the Water Resources

Department, at an estimated cost of $3,750,000 for FY20, and an estimated three-year total not to

exceed $11,750,000 (Engineering Project No. 20048-111).

Please scroll down to view the backup material.

Continued on Page 2

ST. PETERSBURG CITY COUNCIL Consent Agenda

Meeting of September 3, 2020

To: The Honorable Ed Montanari, Chair, and Members of City Council Subject: Approving three-year blanket purchase agreements with Insituform Technologies, LLC, BLD Services, LLC and LMK Pipe Renewal, LLC for SAN Priority Area CIPP - FY20 (20048-111), for the Water Resources Department, at an estimated cost of $3,750,000 for FY20, and an estimated three-year total not to exceed $11,750,000 (Engineering Project No. 20048-111). Explanation: The Procurement and Supply Management Department received six bids for SAN Priority Area CIPP - FY20. The bids were opened on June 14, 2020, and are tabulated as follows:

Bidders Group 1 Group 2 Group 3 Total Amount BLD Services, LLC (Opa Locka) $279,500.00 0 $1,301,875.00 $1,581,375.00

Granite Inliner, LLC (Clearwater) $317,125.00 $3,409,100.00 0 $3,726,225.00

Insituform Technologies, LLC (Chesterfield, MO)

$326,730.50 $2,870,888.00 0 $3,197,618.50

LMK Pipe Renewal, LLC (Fort Lauderdale)

$399,007.00 0 $2,596,000.00 $2,995,007.00

Ric-Man Construction Florida, Inc. (Deerfield Beach)

$376,208.75 $2,561,367.60 0 $2,937,576.35

SAK Construction, LLC (O’Fallon, MO) $337,725.00 $3,386,075.00 0 $3,723,800.00

Work under this project will be located within sanitary sewer basins prioritized for infiltration and inflow mitigation and will include all labor, materials and equipment necessary to rehabilitate deteriorated gravity sanitary sewer mains and public laterals utilizing the trenchless CIPP lining method. Work also includes necessary ancillary activities of traffic control, bypass pumping/flow diversion, pipe cleaning, closed circuit television video inspection, excavation and installation of public clean-outs where required, and restoration of the right-of-way. This work will be performed within sanitary sewer basins that are prioritized based on high inflow and infiltration. This work is required by the Amended Consent Order, supports the Kriseman Infrastructure Plan and the Water Resources Department's updated Sanitary Sewer Asset Management Plan (SSAMP) completed in December 2019. Work is identified, scoped, and scheduled by the City on an ongoing basis, based on input from: - The Wet Weather Overflow Mitigation Program - Ongoing asset inspection and evaluation program - Work history from the City's work and asset management (WAM) system - Response to customer complaints

Work is prioritized based on assets with the highest risk of failure, of which capacity-limited areas of the collection system is also a consideration in the overall risk assessment and prioritization. Locations will be issued to the contractor on a work order basis, according to priorities within the priority areas as determined by the Water Resources and Engineering and Capital Improvements departments.

Trenchless CIPP lining is a cost-effective method of restoring the integrity of deteriorated sanitary sewer piping without the need for disruptive dewatering, sheeting and shoring, excavating and roadway replacement. The bid documents required bidders to provide prices for Group 1 (common ancillary work unit items) together with at least one of Group 2 (mainline CIPP lining unit items) and/or Group 3 (public lateral CIPP lining unit items). It allows the City to award the contract to multiple bidders in any combination of Group 1 combined with Group 2 and or Group 3, based on the best interest of the City. The bid documents

SAN Priority Area CIPP - FY20 September 3, 2020

Page 2

Continued on Page 3

specify that the estimated unit quantities may be increased or decreased without invalidating the prices bid and allow the contract(s) to be awarded for an amount equal to the City’s project budget. Insituform Technologies, LLC, was the lowest responsive bidder for the portion of work to include CIPP lining of mainlines and ancillary work (Group 1 & 2). BLD Services, LLC, was the lowest responsive bidder to provide the necessary work required for public lateral CIPP (the lowest bidder under Group 1 & 3). LMK Pipe Renewal, LLC, are the only two bidders who are qualified and responsive to provide the necessary work required for public lateral CIPP lining (Group 1 & 3). Multiple contracts are recommended for award of Group 1 and 3 to provide for the redundancy and capacity needed to perform this type of work. The project budget established by the Water Resources Department for FY20 is $3,750,000 to be allocated each in FY20 at $2,000,000 for Insituform Technologies, LLC, at $1,250,000 for BLD Services, LLC, and at $500,000 for LMK Pipe Renewal, LLC). The Procurement and Supply Management Department, in cooperation with the Water Resources Department, recommends for award:

SAN Priority Area CIPP………………………………………………………...$11,750,000

(Three-years @ $3,916,666.67 per year)

Insituform Technologies, LLC, BLD Services, LLC, and LMK Pipe Renewal, LLC, have met the requirements of IFB No. 7738, dated May 29, 2020. Insituform Technologies, LLC is headquartered in Chesterfield, Missouri, and has been in business since 1980. BLD Services, LLC is headquartered in Kenner, Louisiana, and has been in business since 2001. LMK Pipe Renewal, LLC is headquartered in Fort Lauderdale and has been in business since 2006. All three bidders have satisfactorily provided these services for the City in the past. Blanket purchase agreements will be issued and will be binding only for the actual services rendered. Amounts paid to vendors pursuant to this award shall not exceed a combined total of $11,750,000. The agreements will be effective from the date of award through August 31, 2023, with one, two-year renewal option. No SBE participation goal was assigned to this project, because there were no certified SBEs available. This work is very specialized. However, BLD Services is using a certified SBE subcontractor for traffic control and safety. City Code, Sec. 2-261, requires that the contractors utilize apprentices for at least 15 percent of labor hours on a major construction project of $1 million or more. All three contractors have certified that there are no apprentices available from a program registered and approved by the Florida Department of Education. All three contractors have certified and agreed to comply with the 15% apprenticeship requirement by using their company-sponsored training program that meets the City Code requirements. BLD Services estimates apprentice utilization of 600 hours, Insituform Technologies, 1,771 hours, and LMK Pipe Renewal, 2,000 hours, for a total of 4,371 hours. City Code, Sec. 2-268, requires contractors to employ disadvantaged workers for at least 15 percent of the work hours on a major construction project of $1 million or more. All three contractors comply.

Bidder Group Amount for all

3 years Insituform Technologies, LLC (Chesterfield, MO) Group I & II $6,500,000 BLD Services, LLC (Kenner, LA) Group I & III $3,750,000 LMK Pipe Renewal, LLC (Fort Lauderdale) Group I & III $1,500,000

SAN Priority Area CIPP - FY20 September 3, 2020

Page 3

BLD Services estimates disadvantaged worker utilization of 270 hours, Insituform Technologies, 1,771 hours, and LMK Pipe Renewal, 1,800 hours, for a total of 3,841 hours. All three contractors and their subcontractors have agreed to pay their workers a responsible wage in accordance with City Code Sec. 2-274. A responsible wage is the hourly wage for each craft or trade under the most recent Davis-Bacon Act wage rates listed for Pinellas County. If the responsible wage is less than the City’s living wage of $14 per hour, then the contractors and their subcontractors must pay the living wage. Cost/Funding/Assessment Information: Funds have been previously appropriated in the Citywide Infrastructure Capital Improvement (3027), SAN I&I Removal FY20 Project (17245). Attachments: Map Resolution

SAN Priority Area CIPP - FY20Project No. 20048-111

±§̈¦I-275

ENGINEERING AND CAPITAL IMPROVEMENTS DEPARTMENT

CITY of ST PETERSBURGAPPROVED BY: DATE:

8/6/2020

PROJECT LOCATION (TYP.)

PROJECT LOCATION

Docu

ment

Path:

S:\Ar

cGIS\

2020

\ENG\

2004

8-111

SAN

Prior

ity Ar

ea C

IPP - F

Y20.m

xd

A RESOLUTION ACCEPTING THE BIDS AND APPROVING

THE AWARD OF THREE YEAR AGREEMENTS WITH ONE

TWO-YEAR RENEWAL OPTION TO INSITUFORM

TECHNOLOGIES, LLC, BLD SERVICES, LLC AND LMK

PIPE RENEWAL, LLC FOR THE SAN PRIORITY AREA CIPP

– FY20 PROJECT FOR THE WATER RESOURCES

DEPARTMENT; PROVIDING THAT THE TOTAL COMBINED

CONTRACT AMOUNT FOR THE ABOVE REFERENCED

AGREEMENTS SHALL NOT EXCEED $11,750,000 FOR THE

INITIAL TERM; AUTHORIZING THE MAYOR OR HIS

DESINGEE TO EXECUTE ALL DOCUMENTS NECESSARY

TO EFFECTUATE THESE TRANSACTIONS; AND

PROVIDING AN EFFECTIVE DATE.

WHEREAS, on May 29, 2020, the Procurement & Supply Management

Department issued IFB No. 7738 for the SAN Priority Area CIPP FY20 Project; and

WHEREAS, the Procurement & Supply Management Department received six (6)

bids in response to IFB No. 7738; and

WHEREAS, Insituform Technologies, LLC, BLD Services, LLC, and LMK Pipe

Renewal, LLC have met the specifications, terms and conditions of IFB No. 7738; and

WHEREAS, the Procurement and Supply Management Department, in

cooperation with the Water Resources Department, recommends approval of these awards.

NOW THEREFORE BE IT RESOLVED by the City Council of the City of St.

Petersburg, Florida, that the bids are accepted and the award of three-year agreements with one

two-year renewal option to Insituform Technologies, LLC, BLD Services, LLC, and LMK Pipe

Renewal, LLC for the SAN Priority Area CIPP – FY20 Project are hereby approved.

BE IT FURTHER RESOLVED that the total contract amount for the above-

referenced agreements shall not exceed $11,750,000 for the initial term.

BE IT FURTHER RESOLVED that the Mayor or his designee is authorized to

execute all documents necessary to effectuate these transactions.

This Resolution shall become effective immediately upon its adoption.

Approved by:

__________________________

City Attorney (Designee) 00523624

Page 1 of 1

-- City of St. Petersburg Authorization Request --

General Authorization

Request #

69639

Name: Pocengal, Nicholas W Request Date: 17-AUG-2020 Status: APPROVED

Authorization Request

Subject: SAN PRIORITY AREA CIPP FY20, Sept. 3 Council Item

Message: Submitted for your approval, please find attached Consent Write-up for SAN PRIORITY AREA CIPP FY20, scheduled to go before City Council on September 3, 2020. Resolution currently in development and will be included on the finalized version when posted into City Clerk's Office Questys system. Should you have any questions, please contact me at extension 3387. Thank you.

SupportingDocumentation:

IFB 7738 SAN Priority Area CIPP FY20 - Approval Request.pdf

Approver Completed By Response ResponseDate

Type

0 Pocengal, Nicholas W SUBMITTED 17-AUG-2020

1 McKee, Stacey Pevzner McKee, Stacey Pevzner APPROVE 18-AUG-2020 User Defined

2 Tankersley, Claude Duval Tankersley, Claude Duval APPROVE 18-AUG-2020 User Defined

18

The following page(s) contain the backup material for Agenda Item: Approving three-year blanket

purchase agreements with SAK Construction, LLC, LMK Pipe Renewal, LLC, and BLD Services,

LLC for SAN Annual CIPP Pipe Lining FY20, for the Water Resources Department, at an estimated

cost of $3,465,000 for FY20, and an estimated three-year total, not to exceed $11,465,000

(Engineering Project No. 20013-111).

Please scroll down to view the backup material.

Continued on Page 2

ST. PETERSBURG CITY COUNCIL Consent Agenda

Meeting of September 3, 2020

To: The Honorable Ed Montanari, Chair, and Members of City Council Subject: Approving three-year blanket purchase agreements with SAK Construction, LLC, LMK Pipe Renewal, LLC, and BLD Services, LLC for SAN Annual CIPP Pipe Lining – FY20, for the Water Resources Department, at an estimated cost of $3,465,000 for FY20, and an estimated three-year total, not to exceed $11,465,000 (Engineering Project No. 20013-111). Explanation: The Procurement and Supply Management Department received six bids for SAN Annual CIPP Lining – FY20. The bids were opened on June 30, 2020, and are tabulated as follows:

Bidders Group 1 Group 2 Group 3 Total Amount BLD Services, LLC (Opa Locka) $211,475.00 0 $1,293,125.00 $1,504,600.00

Granite Inliner, LLC (Clearwater) $329,125.00 $3,028,919.25 0 $3,355,044.25

Insituform Technologies, LLC (Chesterfield, MO)

$228,484.50 $2,800,647.40 0 $3,029,131.90

LMK Pipe Renewal, LLC (Fort Lauderdale)

$648,250.00 0 $2,437,750.00 $3,086,000.00

Ric-Man Construction Florida, Inc. (Deerfield Beach)

$260,533.95 $2,197,918.68 0 $2,458,452.63

SAK Construction, LLC (O’Fallon, MO)

$262,455.00 $2,515,320.00 0 $2,777,775.00

The contractor will provide all labor, materials and equipment necessary to rehabilitate deteriorated gravity sanitary sewer mains and public laterals citywide, utilizing the trenchless CIPP lining method. Work also includes necessary ancillary activities of traffic control, bypass pumping/flow diversion, pipe cleaning, closed circuit television video inspection, excavation and installation of public clean-outs where required, and restoration of the right-of-way. This work will be performed Citywide.

This work is required by the Amended Consent Order, supports the Kriseman Infrastructure Plan and the Water Resources Department's updated Sanitary Sewer Asset Management Plan (SSAMP) completed in December 2019. Work is identified, scoped, and scheduled by the City on an ongoing basis, based on input from: - The Wet Weather Overflow Mitigation Program, - Ongoing asset inspection and evaluation program, - Work history from the City's work and asset management (WAM) system, - Response to customer complaints. Work is prioritized based on assets with the highest risk of failure, of which capacity limited areas of the collection system is also a consideration in the overall risk assessment and prioritization. Locations will be issued to the contractor on a work order basis, according to citywide priorities as determined by the Water Resources and Engineering and Capital Improvements Departments. Trenchless CIPP lining is a cost-effective method of restoring the integrity of deteriorated sanitary sewer piping without the need for disruptive dewatering, sheeting and shoring, excavating and roadway replacement. The bid documents required bidders to provide prices for Group 1 (common ancillary work unit items), together with at least one of Group 2 (mainline CIPP lining unit items), and/or Group 3 (public lateral CIPP lining unit items). It allows the City to award the contract to multiple bidders in any combination of Group 1 combined with Group 2 and or Group 3, based on the best interest of the City. The bid documents specify the estimated unit quantities may be increased or decreased without invalidating the prices bid and allow the contract(s) to be awarded for an amount equal to the City’s project budget.

SAN Annual CIPP Lining – FY20 September 3, 2020

Page 2

Continued on Page 3

SAK Construction, LLC was the lowest responsive bidder for the portion of work to include CIPP lining of mainlines and ancillary work (Group 1 & 2). BLD Services, LLC, the lowest bidder for the portion of work to include CIPP lining of mainlines and public lateral CIPP lining (Group 1 & 3) LMK Pipe Renewal, LLC, are the only two bidders that are qualified and responsive to provide the necessary work required for public lateral CIPP lining (Group 1 & 3). Multiple contracts are recommended for award of Group 1 and 3 to provide for the redundancy and capacity needed to perform this type of work. The project budget established by the Water Resources Department for FY20 is $3,465,000, to be allocated each in FY 20 is $1,936,000 for SAK Construction, LLC, $1,000,000 for BLD Services, LLC, and $529,000 for LMK Pipe Renewal, LLC). The Procurement and Supply Management Department, in cooperation with the Water Resources Department, recommends for award:

Annual CIPP Lining……………………………... $11,465,000

(Three-years @ $3,821,666.67 per year)

SAK Construction, LLC, BLD Services, LLC, and LMK Pipe Renewal, LLC have met the requirements of IFB No. 7737, dated May 29, 2020. SAK Construction, LLC is headquartered in O’Fallon, Missouri, and has been in business since 2006. BLD Services, LLC is headquartered in Kenner, Louisiana, and has been in business since 2001. LMK Pipe Renewal, LLC is headquartered in Fort Lauderdale and has been in business since 2006. All three bidders have satisfactorily provided these services for the City in the past. Blanket purchase agreements will be issued and will be binding only for the actual services rendered. Amounts paid to vendors pursuant to this award shall not exceed a combined total of $11,465,000. The agreements will be effective from date of approval through August 31, 2023, with one, two-year renewal option. No SBE participation goal was assigned to this project, because there were no certified SBEs available. This work is very specialized. However, BLD Services is using a certified SBE subcontractor for traffic control and safety. City Code Sec. 2-261, requires that the contractors utilize apprentices for at least 15 percent of labor hours on a major construction project of $1 million or more. All three contractors have certified that there are no apprentices available from a program registered and approved by the Florida Department of Education. All three contractors have certified and agreed to comply with the 15% apprenticeship requirement by using their company sponsored training program that meets the City Code requirements. BLD Services estimates apprentice utilization of 600 hours, SAK, 4,200 hours and LMK Pipe Renewal, 2,000 hours, for a total of 6,800 hours. City Code Sec. 2-268, requires contractors to employ disadvantaged workers for at least 15 percent of the work hours on a major construction project of $1 million or more. All three contractors comply. BLD Services estimates disadvantaged worker utilization of 270 hours, SAK Construction, 2,800 hours and LMK Pipe Renewal, 1,800 hours, for a total of 4,800 hours. All three contractors and their subcontractors have agreed to pay their workers a responsible wage in accordance with City Code Sec. 2-274. A responsible wage is the hourly wage for each craft or trade under the most recent Davis-Bacon Act wage rates listed for Pinellas County. If the responsible wage is

Bidder Group Amt. for all

3 years SAK Construction, LLC (O’Fallon, Missouri) Group 1 & 2 $5,936,000 BLD Services, LLC (Kenner, Louisiana) Group 1 & 3 $3,500,000 LMK Pipe Renewal, LLC (Fort Lauderdale) Group 1 & 3 $2,029,000

SAN Annual CIPP Lining – FY20 September 3, 2020

Page 3

less than the City’s living wage of $14 per hour, then the contractors and their subcontractors must pay the living wage. Cost/Funding/Assessment Information: Funds have been previously appropriated in the Water Resources Capital Projects Fund (4003), SAN Annual Pipe CIPP Lining FY20 Project (17479), and Citywide Infrastructure Capital Improvement Fund (3027), SAN I&I Removal FY20 Project (17245). Attachments: Map Resolution

")

")

")PINELLAS

BAYWAY54TH AVE S

34TH

ST S

34TH

ST N

4TH

ST N

66TH

ST S

TYRONE BLVD N

PASS

ADEN

AAV

E S

5TH AVE N

4TH

ST N

GANDY BLVD NGANDY BLVD N

ROOSEVELT BLVD N

ULMERTONRD N

§̈¦I-375

§̈¦I-275

§̈¦I-175

Northeast WRF

Northwest WRF

Southwest WRF

Date: 8/6/2020ENGINEERING AND CAPITAL IMPROVEMENTS DEPARTMENTCITY OF ST PETERSBURG

SAN Annual CIPP Lining - FY20Project No. 20013-111

DISCLAIMER:THE INFORMATION IS PROVIDED FOR YOUR PERSONAL USE

AS IS, ALONG WITH THE UNDERSTANDING THAT IT IS NOTGUARANTEED TO BE ACCURATE, CORRECT, OR COMPLETE.INFORMATION SHOULD NOT BE USED TO MAKE FINANCIAL

OR OTHER COMMITMENTS AND ANY CONCLUSIONS DRAWNFROM SUCH INFORMATION ARE THE RESPONSIBILITY OF

THE USER. WHILE EVERY EFFORT IS MADE TO ENSURETHE ACCURACY, CORRECTNESS, AND TIMELINESS OF THEDATA PRESENTED, THE CITY OF ST. PETERSBURG MAKES

NO WARRANTY OR GUARANTEE AS TO THE CONTENT,ACCURACY, TIMELINESS, OR COMPLETENESS OF ANY OF

THE DATA PROVIDED AND ASSUMES NO LIABILITY FOR THEUSE OF THESE MAPS AND DATA.

Z0 10.5 Miles

Docu

ment

Path:

S:\Ar

cGIS\

2020

\ENG\

2001

3-111

SAN A

nnua

l CIPP

Linin

g - FY

20.m

xd

Legend!

! ! !

!!

City Limits") Water Reclamation Facility

Water Reclamation Service AreaService Area

NENWSW

A RESOLUTION ACCEPTING THE BIDS AND APPROVING

THE AWARD OF THREE YEAR AGREEMENTS WITH ONE

TWO-YEAR RENEWAL OPTION TO SAK CONSTRUCTION,

LLC, LMK PIPE RENEWAL, LLC, AND BLD SERVICES, LLC

FOR THE SAN ANNUAL CIPP PIPE LINING FY20 PROJECT

FOR THE WATER RESOURCES DEPARTMENT; PROVIDING

THAT THE TOTAL COMBINED CONTRACT AMOUNT FOR

THE ABOVE REFERENCED AGREEMENTS SHALL NOT

EXCEED $11,465,000 FOR THE INITIAL TERM;

AUTHORIZING THE MAYOR OR HIS DESINGEE TO

EXECUTE ALL DOCUMENTS NECESSARY TO

EFFECTUATE THESE TRANSACTIONS; AND PROVIDING

AN EFFECTIVE DATE.

WHEREAS, on May 29, 2020, the Procurement & Supply Management

Department issued IFB No. 7737 for the SAN Annual CIPP Pipe Lining FY20 Project; and

WHEREAS, the Procurement & Supply Management Department received six (6)

bids in response to IFB No. 7737; and

WHEREAS, SAK Construction, LLC, LMK Pipe Renewal, LLC, and BLD

Services, LLC have met the specifications, terms and conditions of IFB No. 7737; and

WHEREAS, the Procurement and Supply Management Department, in

cooperation with the Water Resources Department, recommends approval of these awards.

NOW THEREFORE BE IT RESOLVED by the City Council of the City of St.

Petersburg, Florida, that the bids are accepted and the award of three-year agreements with one

two-year renewal option to SAK Construction, LLC, LMK Pipe Renewal, LLC, and BLD

Services, LLC for the SAN Annual CIPP Pipe Lining FY20 Project are hereby approved.

BE IT FURTHER RESOLVED that the total contract amount for the above-

referenced agreements shall not exceed $11,465,000 for the initial term.

BE IT FURTHER RESOLVED that the Mayor or his designee is authorized to

execute all documents necessary to effectuate these transactions.

This Resolution shall become effective immediately upon its adoption.

Approved by:

__________________________

City Attorney (Designee) 00523634

Page 1 of 1

-- City of St. Petersburg Authorization Request --

General Authorization

Request #

69638

Name: Pocengal, Nicholas W Request Date: 17-AUG-2020 Status: APPROVED

Authorization Request

Subject: SAN Annual CIPP Lining FY20, September 3 Council

Message: Submitted for your approval, please find attached Consent Write-up for SAN Annual CIPP Lining FY20, scheduled to go before City Council on September 3, 2020. Resolution currently in development and will be included on the finalized version when posted into City Clerk's Office Questys system. Should you have any questions, please contact me at extension 3387. Thank you.

SupportingDocumentation:

913-84 SAN Annual CIPP Lining FY20, September 3, 2020 - Approval Request.pdf

Approver Completed By Response ResponseDate

Type

0 Pocengal, Nicholas W SUBMITTED 17-AUG-2020

1 McKee, Stacey Pevzner McKee, Stacey Pevzner APPROVE 18-AUG-2020 User Defined

2 Tankersley, Claude Duval Tankersley, Claude Duval APPROVE 18-AUG-2020 User Defined

25

The following page(s) contain the backup material for Agenda Item: Approving the First

Amendment to the Architect/Engineering Agreement between the City of St. Petersburg, Florida and

Black & Veatch Corporation (A/E), dated February 28, 2019, for A/E to provide continued project

administration, final design, permitting, and Envision assessment (including application package and

preparation) related to the NEWRF Electrical Distribution System Improvements Project in an

amount not to exceed $2,075,926; providing that the total contract amount shall not exceed

$2,263,106; authorizing the City Attorney's Office to make non-substantive changes to the First

Amendment; authorizing the Mayor or his designee to execute the First Amendment; and providing

an effective date (ECID Project No. 18121-111, Oracle No. 16384)

Please scroll down to view the backup material.

ST. PETERSBURG CITY COUNCIL

Consent Agenda

Meeting of September 3, 2020

TO: The Honorable Ed Montanari, Chair and Members of City Council

SUBJECT: A Resolution approving the First Amendment to the Architect/Engineering Agreement between the City of St. Petersburg, Florida and Black & Veatch Corporation (“A/E”), dated February 28, 2019, for A/E to provide continued project administration, final design, permitting, and Envision assessment (including application package and preparation) related to the NEWRF Electrical Distribution System Improvements Project in an amount not to exceed $2,075,926; providing that the total contract amount shall not exceed $2,263,106; authorizing the City Attorney's Office to make non-substantive changes to the First Amendment; authorizing the Mayor or his designee to execute the First Amendment; and providing an effective date (ECID Project No. 18121-111, Oracle No. 16384).

EXPLANATION: The Northeast Water Reclamation Facility (“NEWRF”) was originally constructed in the 1950s and has undergone various expansions and upgrade projects throughout the years with the last major upgrade occurring in 1978. Much of the electrical equipment requires replacement due to age, physical condition, or lack of availability of replacement parts.

The NEWRF Electrical Distribution System Improvements Project will upgrade the facility’s electrical distribution system with modern equipment to meet the City’s desire for enhanced reliability, maintainability, and safety. This project will be developed consistent with City Code Chapter 2 Article 5 Division 5, Sustainability and Resiliency of City Facilities, as it relates to Envision.

On March 1, 2019, the City of St. Petersburg, Florida (“City”) and Black & Veatch Corporation (“A/E”) entered into an architect/engineering agreement for A/E to furnish professional engineering services for the NEWRF Electrical Distribution System Improvements Project in the amount of $187,180. The scope of services included project administration, project initiation and data collection, define facilities for replacement, a conceptual alternatives analysis, preliminary design memorandum, and additional services allowance.

The recommendations as provided in the design memorandum will be advanced into a detailed design for construction.

This First Amendment in the amount of $2,075,926.00 will provide funding for continued project administration, field investigations, design services, acoustical study, coordination and collaboration, and Envision assessment and application package, and additional services allowance.

A/E Agreement and the First Amendment included the following phases and associated not to exceed costs respectively:

Agreement Project Setup and Administration Project Initiation and Data Collection Define Facilities for Replacement Conceptual Alternatives Evaluation Preliminary Design Memorandum

$ 13,700.00 $ 15,400.00 $ 8,840.00 $ 79,690.00 $ 59,550.00

(Approved) (Approved) (Approved) (Approved) (Approved)

Page 1 of 2

Allowance Subtotal

$ 10,000.00 $ $187,180.00

(Approved) (Approved)

Amendment No. 1 Project Setup and Administration Field Investigations Design Services Permitting Services Acoustical Study Coordination and Collaboration Envision Process Management Allowance (Unforeseen) Allowance (Envision) Subtotal

$ 68,136.00 $ 90,331.00 $ 1,329,861.00 $ 39,626.00 $ 37,332.00 $ 133,440.00 $ 127,200.00 $ 100,000.00 $ 150,000.00 $ 2,075,926.00

(New) (New) (New) (New) (New) (New) (New) (New) (New)

Total A/E $ 2,263,106.00

A/E services during the construction phase will be provided to Council for approval as an Amendment to this Task Order.

Contractor costs for preconstruction services will be provided to Council for approval as a separate Agreement following selection. During preconstruction Services phase, the contractor will generate costs for implementing these improvements. These costs will be provided to Council as an Amendment to the Contractor Agreement for approval.

RECOMMENDATION: Administration recommends authorizing the Mayor or his designee to execute the First Amendment to the Architect/Engineering Agreement between the City of St. Petersburg, Florida and Black & Veatch Corporation (“A/E”), dated February 28, 2019, for A/E to provide continued project administration, final design, permitting, and Envision assessment (including application package and preparation) related to the NEWRF Electrical Distribution System Improvements Project in an amount not to exceed $2,075,926; providing that the total contract amount shall not exceed $2,263,106; authorizing the City Attorney's Office to make non-substantive changes to the First Amendment; authorizing the Mayor or his designee to execute the First Amendment; and providing an effective date (ECID Project No. 18121-111, Oracle No. 16384)

COST/FUNDING/ASSESSMENT INFORMATION: Funds have been previously appropriated in the Water Resources Capital Projects Fund (4003) WRF NE Electric Distribution Improvements FY18 Project (16384).

ATTACHMENTS: Resolution Attachment 1 to Appendix A – Scope of Services Amendment 1 to Appendix B – Fee Schedule Attachment 1 to Appendix C – Schedule

Page 2 of 2

RESOLUTION NO. 2020-_____

A RESOLUTION APPROVING THE FIRST AMENDMENT TO THE

ARCHITECT/ENGINEERING AGREEMENT BETWEEN THE

CITY OF ST. PETERSBURG, FLORIDA AND BLACK & VEATCH

CORPORATION (“A/E”) DATED FEBRUARY 28, 2019 FOR A/E

TO PROVIDE CONTINUED PROJECT ADMINISTRATION,

FINAL DESIGN, PERMITTING, AND ENVISION ASSESSMENT

(INCLUDING APPLICATION PACKAGE AND PREPARATION)

RELATED TO THE NEWRF ELECTRICAL DISTRIBUTION

SYSTEM IMPROVEMENTS PROJECT IN AN AMOUNT NOT TO

EXCEED $2,075,926; PROVIDING THAT THE TOTAL

CONTRACT AMOUNT SHALL NOT EXCEED $2,263,106;

AUTHORIZING THE CITY ATTORNEY'S OFFICE TO MAKE

NON-SUBSTANTIVE CHANGES TO THE FIRST AMENDMENT;

AUTHORIZING THE MAYOR OR HIS DESIGNEE TO EXECUTE

THE FIRST AMENDMENT; AND PROVIDING AN EFFECTIVE

DATE (ECID PROJECT NO. 18121-111, ORACLE NO. 16384).

WHEREAS, the City of St. Petersburg, Florida (“City”) and Black & Veatch Corporation

(“A/E”) entered into an architect/engineering agreement (“Agreement”) on February 28, 2019 for

A/E to provide project administration, project initiation and data collection, define facilities for

replacement, a conceptual alternatives analysis, and preliminary design memorandum services for

the NEWRF Electrical Distribution System Improvements Project (“Project”) in the amount of

$187,180; and

WHEREAS, the City and A/E desire to amend the Agreement for A/E to provide continued

project administration, final design, permitting, and Envision assessment (including application

package and preparation) related to the Project in an amount not to exceed $2,075,926.

NOW THEREFORE BE IT RESOLVED by the City Council of the City of St. Petersburg,

Florida that the First Amendment to the architect/engineering agreement between the City of St.

Petersburg, Florida and Black & Veatch Corporation (“A/E”) dated February 28, 2019 for A/E to

provide continued project administration, final design, permitting, and Envision assessment

(including application package and preparation) related to the NEWRF Electrical Distribution

System Improvements Project in an amount not to exceed $2,075,926 is hereby approved.

BE IT FURTHER RESOLVED that the total contract amount shall not exceed $2,263,106.

BE IT FURTHER RESOLVED that the City Attorney’s Office is authorized to make non-

substantive changes to the First Amendment.

BE IT FURTHER RESOLVED that the Mayor or his designee is authorized to execute the

First Amendment.

This resolution shall become effective immediately upon its adoption.

Approved by:

_

City Attorney (Designee)

00523248

ATTACHMENT 1 TO APPENDIX A - SCOPE OF SERVICES NORTHEAST WATER RECLAMATION FACILITY

ELECTRICAL DISTRIBUTION SYSTEM IMPROVEMENTS CITY OF ST. PETERSBURG, FLORIDA

PROJECT NO. 18121-111

In addition to the services, activities, responsibilities and Deliverables set forth in Appendix A, A/E shall also provide the services, activities, responsibilities and Deliverables set forth in this Attachment 1 to Appendix A, as follows:

TASK 1 PROJECT SETUP AND ADMINISTRATION – ADDITIONAL SERVICES

1.1 PROJECT SETUP – ADDITIONAL SERVICES The A/E will set-up the accounting system and filing system for the project. In addition, the A/E will develop a Project Execution Plan, Staffing Plan, QA/QC Plan, Change/Risk Management Plan, and Health & Safety Planning Checklist.

The A/E will develop templates to support monthly invoicing, progress reporting, and change management reporting to the City.

The A/E will prepare and submit an initial project schedule (Gantt chart format) with all substantial milestone dates based on the approved Notice to Proceed (NTP) and will schedule as many meetings up front as possible.

The A/E will negotiate and establish subconsultant agreements with subconsultants for specialized subconsultant services needed to support the project, including surveying, geotechnical investigation, underground utility locations, and stormwater permitting.

1.2 PROJECT COORDINATION MEETINGS – ADDITIONAL SERVICES During the project, the A/E team will hold brief periodic internal coordination meetings to discuss the status of the project activities, identify potential issues and review the scope, upcoming milestones and budget status.

1.3 PROJECT ADMINISTRATION – ADDITIONAL SERVICES On an ongoing basis throughout the project, the A/E will track and monitor the project schedule, budget, quality, and risks, and facilitate coordination of the design team to monitor progress, identify potential issues, address staffing needs, etc.

The A/E will perform ongoing management and oversight of subconsultants including processing subconsultant invoices.

The A/E will prepare and submit, approximately monthly, an invoice for services completed. The invoices will be accompanied by a progress report summarizing the work completed during the invoicing period and the primary upcoming scheduled activities. Invoices will also be accompanied by a change management log.

The A/E will update the project schedule, as needed, and submit to the City an updated schedule after key milestones and as otherwise necessary to reflect changes in project schedule.

Project administration shall include keeping organized files and engaging in regular communication / coordination with the City.

08/14/2020

Attachment 1 to Appendix A – Scope of Services Northeast Water Reclamation Facility Electrical Distribution System Improvements City of St. Petersburg Project No. 18121-111

TASK 7 FIELD INVESTIGATIONS

7.1 SURVEYING AND UNDERGROUND UTILITY LOCATIONS Land surveying services will be performed to support the project. This will generally include:

• A topographic, tree and utility survey of the NEWRF site interior to the boundary road that surrounds the majority of the facility (refer to red outline line in Attachment A). Survey will include all above-ground improvements, visible utilities, 50’X50’ elevation grid, and changes in grade.

• 30 subsurface utility locations performed using non-destructive methods.

The majority of this task will be performed by Suncoast Land Surveying as a Subconsultant to the A/E. Refer to the Subconsultant proposal in Attachment A for a description of the specific work elements to be performed under this subtask.

7.2 GEOTECHNICAL INVESTIGATION AND REPORT Geotechnical services will be performed to support the design of proposed structures and related infrastructure. This will generally include:

• Site visit

• Locate existing utilities

• 18 Standard Penetration Test (SPT) borings including soil sampling

• Laboratory analyses of soil samples

• Geotechnical report

The majority of this task will be performed by M.C. Squared, Inc. as a Subconsultant to the A/E. Refer to the Subconsultant proposal in Attachment A for a description of the specific work elements to be performed under this subtask.

TASK 8 DESIGN SERVICES

The improvements to be implemented under this project, and therefore covered in the design documents, are those improvements defined in the final NEWRF Electrical Improvements Preliminary Design Memorandum (Black & Veatch, January 2020). The improvements generally include the following major elements:

• Replacement of switchgear, MCCs, PLCs, Electrical panels, and other electrical features as recommended in the PDM.

• Four new electrical enclosures to house new electrical equipment for each of several load centers as recommended in the PDM. Electrical enclosures will be air-conditioned two-story structures of concrete masonry unit (CMU) construction, and will include structural, architectural, HVAC, and electrical / lighting elements as required. The four new electrical enclosures have very similar space requirements and are anticipated to be designed with the same footprint for consistency of infrastructure and design / construction efficiency.

• New centralized backup power generation facility including four 1,750kV diesel-fueled emergency backup generators in sound attenuated enclosures and four accompanying

08/14/2020 2

Attachment 1 to Appendix A – Scope of Services Northeast Water Reclamation Facility Electrical Distribution System Improvements City of St. Petersburg Project No. 18121-111

diesel-fuel tanks, located together on an elevated concrete pad.

• A new electrical enclosure to house switchgear and other electrical equipment associated with generators and electrical distribution system, located adjacent to the generator pad. The electrical enclosure will be and air-conditioned one-story structure of concrete masonry unit (CMU) construction on an elevated concrete foundation, and will include structural, architectural, HVAC, and electrical / lighting elements as required.

• A plant-wide 12kV power distribution system including looped electrical cable in concrete duct bank routed around the plant and dual step-down transformers to supply utility and backup power to each electrical load center.

• Replacement of selected electrical cable and conduit from MCCs to electrical loads throughout the plant.

• Demolition of retired facilities and equipment, generally including two existing electrical MCC buildings, five existing diesel-fueled engine generators (with concrete pads and CMU enclosures), five diesel storage tanks (with concrete pads and CMU enclosures), and selected electrical equipment, wiring, and conduit.

• Minor patching and painting in existing building spaces to remain, which are impacted by equipment demolition.

The A/E will design the proposed facilities and develop design documents to support construction of the improvements by a CMAR selected by and under contract to the City. It is understood that the project be combined with the separate Distribution Pumping Station design (developed by Cardno) and constructed together under a single CMAR contract.

The specifications will be prepared utilizing A/E’s standard technical specifications, coordinated with City standard material requirements. The design will incorporate the City’s standard General Requirements specification section and Measurement and Payment section, as applicable, which will be customized for the requirements of the project based on input from the A/E and the City.

The drawings will be developed using A/E’s CAD standards but will incorporate City standard details as applicable.

In order to maximize the consistency of materials provided under this project and the Distribution Pumping Station project, some commonality of specifications is desired by the City. To that end, Black & Veatch will provide certain electrical specifications developed for the project to Cardno for their use and reference in developing specifications customized for their design but incorporating elements from Black & Veatch’s specifications, as applicable, related to materials of construction, quality, manufacturer, etc.

The design documents will incorporate startup and commissioning requirements and a recommended construction sequencing plan which outlines acceptable service disruptions during tie-ins.

The design will be developed in milestone steps per the following subtasks:

8.1 30% LEVEL DESIGN A. 30% Design Development – A/E will progress the design to a 30% level of completion. An internal quality control review will be conducted on the 30% design and review comments will be incorporated prior to submittal to the City. A/E will produce and submit a 30% design deliverable

08/14/2020 3

Attachment 1 to Appendix A – Scope of Services Northeast Water Reclamation Facility Electrical Distribution System Improvements City of St. Petersburg Project No. 18121-111

package of drawings and specifications. Five printed copies of drawings (11”x17”) and list of specifications will be provided for City review, along with electronic files in pdf format.

B. 30% City Review Meeting – A/E will conduct a review meeting with City staff to review the progressing design documents and discuss City comments. A/E will prepare an agenda, meeting roster, and other materials as may be necessary to support the meeting. Key members of the design team will attend in person, and select discipline leads will attend remotely, as needed. Following the meeting, A/E will prepare and forwarded meeting minutes to the City Project Manager for distribution. A/E will also develop and submit to the City a review comment log documenting the review comments, A/E’s responses, and proposed actions to address comments. The review comment log will capture comments by the City and Cardno. Based on the 30% milestone submittal and reviews, critical elements of the design will be frozen in order to avoid schedule and cost impacts associated with redesign.

C. 30% Level Cost Opinion – A/E will prepare a Class level 3 Opinion of Probable Construction Cost (OPCC) based on the 30% stage of design completion for review by City and CMAR staff.

8.2 60% LEVEL DESIGN A. 60% Design Development – A/E will progress the design to a 60% level of completion. An internal quality control review will be conducted on the 60% design and review comments will be incorporated prior to submittal to the City. A/E will produce and submit a 60% design deliverable package of drawings and specifications. Five printed copies of drawings (11”x17”) and specifications will be provided for City review, along with electronic files in pdf format.

B. 60% City Review Meeting – A/E will conduct a review meeting with City and CMAR staff to review the progressing design documents and discuss comments by the City and by the CMAR. A/E will prepare an agenda, meeting roster, and other materials as may be necessary to support the meeting. Key members of the design team will attend in person, and select discipline leads will attend remotely, as needed. Following the meeting, A/E will prepare and distribute meeting minutes to the City Project Manager for distribution. A/E will also develop and submit to the City a review comment log documenting the review comments, A/E’s responses, and proposed actions to address comments. The review comment log will capture comments by the City, CMAR, and Cardno. Based on the 60% milestone submittal and reviews, critical elements of the design will be frozen in order to avoid schedule and cost impacts associated with redesign.

C. A/E will provide technical specifications for select major equipment, for use by the City for the purposes of making Owner Direct Purchases (ODPs). Additional support by A/E beyond providing the specifications earlier in the design process is not anticipated to be needed but could be provided under the Unforeseen Allowance. Potential ODP equipment includes generators, switchgear and MCCs.

8.3 90% LEVEL DESIGN A. 90% Design Development – A/E will progress the design to a 90% level of completion. An internal quality control review will be conducted on the 90% design and review comments will be incorporated prior to submittal to the City. A/E will produce and submit a 90% design deliverable package of drawings and specifications. Five printed copies of drawings (11”x17”) and specifications will be provided for City review, along with electronic files in pdf format.

B. 90% City Review Meeting – A/E will conduct a review meeting with City and CMAR staff to review the progressing design documents and discuss comments by the City and by the CMAR. A/E will prepare an agenda, meeting roster, and other materials as may be necessary to support the meeting. Key members of the design team will attend in person, and select discipline leads

08/14/2020 4

Attachment 1 to Appendix A – Scope of Services Northeast Water Reclamation Facility Electrical Distribution System Improvements City of St. Petersburg Project No. 18121-111

will attend remotely, as needed. Following the meeting, A/E will prepare and submit meeting minutes to the Project Manager for distribution. A/E will also develop and submit to the City a review comment log documenting the review comments, A/E’s responses, and proposed actions to address comments. The review comment log will capture comments by the City, CMAR, and Cardno. Based on the 90% milestone submittal and reviews, critical elements of the design will be frozen in order to avoid schedule and cost impacts associated with redesign.

C. The 90% level design documents will be used for submittal to the Building Department for plans review.

8.4 100% DESIGN DOCUMENTS Upon receipt of final comments from City (including Legal), CMAR, and Building Department, the A/E will develop 100% design documents. The 100% design submittal will consist of:

• Signed and sealed electronic files of drawings and specifications in electronic pdf format

• Drawing files in AutoCAD format

• Specification files in Microsoft Word format

• Five hard copies of Drawings and Specifications

TASK 9 PERMITTING SERVICES

The A/E will provide services in support of obtaining regulatory approvals for the project as defined below. It is understood that the City will directly pay permit application fees and will be responsible for the FDEP Wastewater Minor Modification Construction Permit Exemption. Services to be provided by the A/E include:

9.1 BUILDING PERMIT PLANS REVIEW The A/E will provide services to obtain a Building Permit Plans Review through the City’s Construction Services and Procurement (CS&P) Department and incorporate CS&P comments into the design. A/E will facilitate submittal of Cardno’s Distribution Pumping Station design drawings for review simultaneous with submittal of A/E’s design. It is understood that Cardno will support by providing signed and sealed drawings and other necessary information relating to their design and will address CS&P comments on their design. A/E’s services will include the following:

• Conduct a pre-permit application meeting as the design is approaching 100% (Cardno will also be in attendance).

• Complete a Building Permit Application Form, with cost estimate discipline breakdown.

• Produce and sign and seal three sets of A/E’s drawings. It is understood that Cardno will provide three sets of their signed and sealed drawings to the A/E. A/E will assemble both design sets into a single application package.

• Submit the application package to the City’s CS&P Department.

• Address / respond to CS&P comments with follow-up letter.

• Attend one meeting with CS&P staff to discuss questions and comments along with Cardno and City staff.

• Incorporate comments into the design documents for the A/E portion.

08/14/2020 5

Attachment 1 to Appendix A – Scope of Services Northeast Water Reclamation Facility Electrical Distribution System Improvements City of St. Petersburg Project No. 18121-111

This permit is expected to be based on the 90% design deliverable.

9.2 FDEP ENVIRONMENTAL RESOURCE PERMIT (ERP) The A/E shall provide services to obtain an Environmental Resource Permit (ERP) through the Florida Department of Environmental Protection (FDEP) for this project together with the distribution pump station project. A/E will engage the assistance of an Environmental Permitting Subconsultant in support of this permit task (See Earth Resources subconsultant proposal, attached). Services to be provided by the A/E shall include the following:

• Schedule and attend pre-application meeting with FDEP to confirm permitting requirements.

• Create up to two specialized drawings to depict delineation of wetlands within the project area location and stormwater containment, silt fences for both projects in accordance with governing standards.

• Review available electronic data and GIS database(s) as well as conduct a field review to determine potential presence of endangered, threatened, or Species of Special Concern as determined by the governing Agency(ies).

• Prepare the required information and permit application in support of an ERP from FDEP.

• Respond to up to two Requests for Additional Information (RAIs) issued by FDEP.

This permit is expected to be based on the 60% design deliverable and assumes approximately 90 days for FDEP to issue the permit.

9.3 CITY OF ST PETERSBURG DEVELOPMENT REVIEW COMMISSION (DRC) APPROVAL The A/E shall provide services to obtain a DRC Approval of the Electrical Distribution System Improvements design and Cardno’s Distribution Pumping Station design. It is understood that Cardno will provide documentation necessary to support the approval process. Services to be provided by the A/E shall include the following:

• Complete the Special Exception & Site Plan Review application form.

• Initiate and attend the Pre-Application meeting with the City. Meeting minutes will be documented using the City’s Pre-Application Meeting Notes form.

• Prepare site-specific calculations and data necessary to complete the City’s Data Sheet form. Data for this form includes land use types, floor area calculations, paving coverage, impervious surface coverage, and similar data listed on the Data Sheet form.

• Prepare a Public Participation Report outlining steps taken to notify residents of the area surrounding the site of the proposed project. It is anticipated that A/E, along with City representatives, will hold one public meeting with area residents.

• Prepare two copies of a project site plan and survey including property lines, structures, utilities, stormwater retention areas, easements, and any other architectural or engineering features.

• Prepare two copies of a landscape plan. Plan will include names, sizes, and location of plants and trees. Trees to be removed or protected will be identified.

• Prepare elevation drawings of all new structures. Drawings will depict all sides of the

08/14/2020 6

Attachment 1 to Appendix A – Scope of Services Northeast Water Reclamation Facility Electrical Distribution System Improvements City of St. Petersburg Project No. 18121-111

proposed structures.

This permit is expected to be based on the 30% design deliverable.

TASK 10 ACOUSTICAL STUDY

10.1 ACOUSTICAL STUDY An acoustical study will be performed under this subtask, to include a sound level survey of the site. The study will include acoustical modeling and analysis of the proposed improvements in both the Electrical Distribution System Improvements project and the Distribution Pumping Station project in order to recommend sound mitigation measures that may be incorporated into the design.

A. Code Review - The acoustical study will include a detailed review of applicable noise laws, ordinances, regulations, and standards (federal, state, and local). Relevant GIS and parcel data will also be reviewed to confirm (e.g.) zoning/land use.

B. Site Visit and Sound Level Survey - An acoustical professional will visit the Project site and surrounding area to observe and measure the existing acoustical conditions. A short survey protocol document will be prepared for review with the Project team and the City in order to coordinate access to the Project site, and to review the survey schedule, general processes and procedures, and safety and security concerns. The survey will include continuous sound level monitors, that will be placed and recording data for a minimum duration of 24 hours, set up at two representative locations on the Project site or in the nearby residential community. The continuous sound level monitors will be unmanned, but will be inspected regularly during the survey period. The continuous sound level monitors will be locked and secured on NEWRF property or in public rights-of-way and will be monitored remotely via 4G wireless Internet connection. Monitors will not be placed on private property. During the sound level monitor inspection visits, noise sources will be observed, meteorological conditions will be observed and measured, and short-term sound levels will be measured as deemed necessary to supplement the continuous monitoring. Short-term sound levels will also be measured at additional locations as deemed necessary to fully characterize the existing acoustical conditions around the Project site. The survey will be completed in accordance with industry standards and local regulations using International Electrical Code (IEC) Class 1 or Class 2 instrumentation. A four-day trip for one acoustical professional is assumed, including travel. The measurement and monitoring data from the survey will be reviewed and reduced in order to facilitate additional analyses.

C. Acoustical Modeling, Analysis, and TM - The Project will be modeled, based on the 30% design, in accordance with ISO 9613 methodology. Acoustical modeling will address the Electrical Distribution System Improvements design as well as the Distribution Pumping Station Design (Cardno). The acoustical model will include input based on local terrain (via GIS / DTM data sources) and meteorological trends (via available online historical weather data). Modeling of Project equipment and structures will be based on drawings and equipment/process designs provided by the Project team. The results of the acoustical model and the sound level survey will be used to investigate mitigation measures for Project equipment as necessary to ensure the future operation of the Project will comply with local regulations. A technical memo (TM) will be prepared that provides details of the regulatory requirements, the results of the sound level survey, and the results of acoustical modeling and analysis. Details of acoustical requirements for equipment and conceptual mitigation measures (if any) will be provided in the TM, including estimated effectiveness based on modeling results.

The TM will be submitted in draft in pdf format. The City’s comments on the draft TM will be

08/14/2020 7

Attachment 1 to Appendix A – Scope of Services Northeast Water Reclamation Facility Electrical Distribution System Improvements City of St. Petersburg Project No. 18121-111

discussed during one of the monthly Progress Meetings covered in Task 6. Upon addressing City comments, the Final TM will be submitted in pdf format.

TASK 11 COORDINATION AND COLLABORATION

11.1 PROGRESS MEETINGS During the design phase of the project, A/E will attend and facilitate progress meetings with the City and other project team members when requested by the City. One such meeting will be the project kickoff meeting soon after NTP. Progress Meetings will be held at a location selected by the City and may be attended by representatives of the CMAR and other Consultants.

The Progress Meetings will be for the purpose of updating the City on progress and schedule, discussing project risks, discussing open questions and concerns, and collaborating on points of interface.

The A/E will prepare an agenda, meeting roster, and other materials as may be necessary to support the meeting. It is anticipated that on average, three A/E professionals will attend in person, and select discipline leads will attend remotely, as needed. Following the meeting, A/E will prepare and distribute meeting minutes.

It is anticipated that the design milestone review meetings covered in Task 8 will serve as three of the Progress Meetings. This Task includes budget for 9 additional Progress Meetings to be scheduled during the design phase of the project.

11.2 DISTRIBUTION PUMPING STATION PROJECT REVIEW & MEETINGS A. Milestone Deliverable Review - The A/E will perform a high-level coordination review of the 30%, 60%, and 90% design deliverables submitted to the City by Cardno for the Distribution Pumping Station project, for the purposes of identifying potential conflicts between the Cardno and A/E designs. A/E’s review will be for the purpose of coordinating with the Electrical Distribution System Improvements project as relates to points of interface and design consistency (equipment type, material wells of construction, etc.). The A/E will submit review comments to the City.

B. Review Meeting Attendance - The A/E will attend the 30%, 60%, and 90% milestone review meetings for the Distribution Pumping Station design project to discuss A/E’s review comments and collaborate on points of interface. One A/E professional will attend each meeting.

11.3 COLLABORATION WITH CMAR The City will engage the services of a CMAR to provide preconstruction services. The CMAR will be brought on board sometime around the 30% design. The CMAR will attend the design review meetings and perform review and comment on the developing design. A/E will work collaboratively with the selected CMAR and the City to develop the 100% design. Services to be provided by the A/E in coordination with the CMAR include the following:

• 30% Constructability and Value Engineering Review – A/E will consider and provide responses to review comments submitted by the CMAR. The review comments will be discussed at one of the Progress Meetings under Task 11.1.

• 60% Constructability and Value Engineering Review – A/E will consider and provide responses to review comments submitted by the CMAR. The review comments will be discussed at one of the Progress Meetings under Task 11.1.

08/14/2020 8

Attachment 1 to Appendix A – Scope of Services Northeast Water Reclamation Facility Electrical Distribution System Improvements City of St. Petersburg Project No. 18121-111

• 60% Cost Estimate Review – A/E will perform a high-level review of the Cost Estimate developed by the CMAR and submit written comments to the City’s Project Manager. 24 hours have been budgeted to review the 60% cost estimate.

• 90% Cost Estimate Review – A/E will perform a high-level review of the Cost Estimate developed by the CMAR and submit written comments to the City’s Project Manager. 24 hours have been budgeted to review the 90% cost estimate.

11.4 PUBLIC OUTREACH A/E will assist the City with public outreach activities, by providing brief, high-level PowerPoint slides for the City to use at public meetings. The content of the slides may include design components (e.g. drawing sheets) or Envision-related information. One representative from the A/E will attend up to 2 public meetings (usually held in the evening) at 30% design stage and up to 2 public meetings at the 90% design stage.

TASK 12 ENVISION PROCESS MANAGEMENT

The A/E will oversee the management and facilitation of the Envision certification process, a sustainability rating system that is administered by the Institute for Sustainable Infrastructure (ISI). The primary goals and assumptions for the Envision process specific to this project are to:

1. Adhere to the City’s Integrated Sustainability Action Plan including climate, sustainability, and resilience aspects.

2. Comply with requirements of the St. Petersburg City Code Chapter 2, Article 5, Division 5: Sustainability and Resiliency of City Facilities, as it relates to Envision.

3. Coordinate input and effort from the City, the CMAR, Cardno, subconsultants, and other parties associated with the Project that are not parties to the Agreement.

4. The A/E proposes to engage Rebecca Oliva (an Envision Sustainability Professional (ENV SP) employed by Black & Veatch) to manage the registration process and assist the design and construction teams in pursuing the Envision Gold level award certification (earn 40-49% of total applicable points). The ENV SP will interface with ISI and will take the lead of all Envision-related matters including coordination meetings, documentation collection and organization, and project registration with ISI to pursue Gold certification. The ENV SP Lead will oversee internal A/E team members including technical advisors, administrative support, junior staff and GIS experts and will lead coordination among external parties on the Project.

5. Envision administration services under this task are included in the project’s lump sum amount. Any additional Envision services the City would like the A/E to perform will be on a time & material basis due to the level of uncertainty regarding the level of work and division of responsibility for among the A/E, CMAR, City, Cardno, and other parties involved with the Project. An allowance is included to cover additional Envision services.

6. It is anticipated that the credits will be divided and assigned by the ENV SP to the various parties involved in the Envision process.

7. The budget for this task includes the A/E’s professional services for Envision process management. The budget for this task does not include costs for implementing specific recommendations or requirements by the Envision rating system (e.g. conduct baseline assessments, conduct a life-cycle economic evaluation, perform analyses, calculations), which are included in the Envision Allowance budget, billed on a time & material basis.

08/14/2020 9

ister ----· W½ ... Award - . .

Complet e

Attachment 1 to Appendix A – Scope of Services Northeast Water Reclamation Facility Electrical Distribution System Improvements City of St. Petersburg Project No. 18121-111

8. Envision typically requires involvement of City departments beyond the Water Resources Department, under which this Agreement falls. The City Project Manager is assumed to serve as that interface between other City departments that may be involved with the Envision process.

9. This Envision certification process will cover the A/E’s design, Cardno’s design and the CMAR’s construction phase.

10. The Project will pursue Pathway A: Design + Post Construction verification pathway. From the ISI’s published “Guide for Envision Verification for Applicants 2019”, the Pathway A flow chart is as follows:

12.1 DATA REVIEW AND ISI REGISTRATION A. Document Management - Throughout the project, the A/E will oversee and maintain the Document Management Information System (DMIS) using Bentley’s ProjectWise software. Early on in this task, the A/E will set up ProjectWise access for users external to the A/E so that all members of the Envision team are able to post data and credit documentation. This streamlines document sharing and streamlines the data organization and management process.

B. Data Review and Request - The A/E will perform a cursory review of what documents and websites are available for use in obtaining possible Envision points. The ENV SP will identify gaps and develop a data request list to the City that will be refined and resubmitted based on the Envision Kickoff Meeting discussion. The status of data transmittals will be tracked by the A/E until all available items are received. The expected information request to the City would be include items such as: maps, surveys, GIS data, operational data, record drawings, studies, planning documents, meeting minutes, submittals.

C. Self-Scoring - After reviewing the available data and in conjunction with the Envision Kickoff Meeting, the A/E will create the Envision online scoresheet and set up the self-assessment (an iterative tool used for this Envision process). This will allow the ENV SP to then oversee the project framework setup, establish a documentation tracker, and develop an adaptive scoresheet tracker that will be used during the 1st submission Subtask.

D. Project Registration with ISI - The A/E will register project through the ISI website, providing additional details about the project. The project will be registered for Pathway A: Design + Post Construction verification. The $2,000 for project registration with ISI would be paid directly by the City to ISI during this Subtask.

12.2 FIRST SUBMISSION A. Division of Responsibility - Based on the information available and the Levels of Achievement desired (a combination of which will be required to obtain a Gold level Award) the A/E will take a first cut of identifying which of the 64 credits to pursue and which to not pursue (e.g. too cumbersome, too costly, infeasible, applicable vs. not applicable, innovation credits to pursue). Furthermore, the A/E will preliminary identify the parties best suited to provide documentation for each credit. This will be known as the “Division of Responsibility (DOR)” document, which essentially will be a Envision credit list and show entities’ names next to each credit and the targeted Level of Achievement to be earned. The Envision team will be engaged for consensus on the DOR document, so that there is a clear understanding of which party or individual is

08/14/2020 10

Attachment 1 to Appendix A – Scope of Services Northeast Water Reclamation Facility Electrical Distribution System Improvements City of St. Petersburg Project No. 18121-111

responsible for providing information for each Envision credit.

B. Submittal Packet Compilation - Those parties identified by the DOR will be expected to deliver appropriate and sufficient documentation to the ENV SP for compilation into the submittal packet in a timely manner. The ENV SP will collect, track and compile documentation to support the 1st

submittal. The A/E will prepare the overall cover letter for the Project (identifying location, project boundary, parties involved, etc.), cover sheets for each credit, and submit the draft 1st submission packet to the City for review and comment. After the City has reviewed the 1st submittal packet, the ENV SP will assign tasks to Envision team members to modify their credit packages to the City’s satisfaction before they are finalized.

The ENV SP will prepare and submit the “Verification Submittal – Quality Assurance Checklist”. At approximately 95% design completion, the ENV SP will submit the final 1st submittal credit documentations through the ISI website. The estimated $26,000 3rd project verification fee (based on a project cost of greater than $25 million) would be paid by the City directly to ISI during this Subtask.

12.3 SECOND SUBMISSION AND AWARD The process for the 2nd submission will be similar to the 1st submission, but a reduced level of effort is anticipated due to many of the credit scores being “locked in” after 1st submission.

Under this task, the ENV SP will review the ISI Verifier’s feedback and make recommendations to the Envision team for which credits should be attempted for the second round. This is the Envision team’s opportunity to respond to ENV SV (Verifier) comments and provide additional documentation to either meet that original Level of Achievement or provide possible new information in support of a higher Level of Achievement. Gaps may need to be filled, information clarified, or new information presented during this round.

12.4 ENVISION MEETINGS A series of meetings, emails and phone calls will be required for Envision coordination among the various parties involved. This task covers communication between the A/E, City, CMAR, Cardno and subconsultants, specifically related to Envision.

Envision is a very collaborative process. The budget assumes 16, (2-hour each), in-person meetings with the ENV SP and up to 1 other A/E professional. Time to prepare agenda, content and meeting minutes are also included. One such meeting will be the Envision Kickoff Meeting, during which the ENV SP will provide an overview of Envision, framework, schedule, goals and expectations for data gathering from various parties, how Envision will be documented and organized for this project, establishing baselines, channels of communication, etc.

Exact meeting content, topics of discussion, dates, times and attendees will be determined between the ENV SP, A/E Project Manager and City’s Project Manager. For communication efforts beyond these assumptions, the Allowance may be used.

DELIVERABLES

Task 1 – Project Management Setup and Administration – Additional Services

• Initial Project Schedule and periodic schedule updates

• Progress Report and Change Management Log (approximately monthly, submitted with invoices)

08/14/2020 11

Attachment 1 to Appendix A – Scope of Services Northeast Water Reclamation Facility Electrical Distribution System Improvements City of St. Petersburg Project No. 18121-111

Task 7 – Field Investigations

• Signed and sealed survey drawings and electric files for City’s records • Final geotechnical report

Task 8 – Design Services

• 30%, 60%, and 90% Level Design Submittals: o 5 sets of printed Drawings (11”x17”) and Specifications o PDF files of Drawings and Specifications o OPCC (30% only) o Review meeting Sign-In Sheet, Agenda and Meeting Minutes o Review comment log

• 100% Level Design Submittals: o Signed and sealed Drawing files (pdf) o Signed and sealed Specifications files (pdf) o Drawing files in AutoCAD format o Specification Files in Microsoft Word Format

Task 9 – Permitting Services

• Record copy of permit application packages submitted to Agencies in pdf format.

• Record copy A/E’s letters and/or RAI responses submitted to Agencies in pdf format.

Task 10 – Acoustical Study

• Draft Acoustical Modeling Technical Memorandum (TM) in pdf format.

• Final Acoustical Modeling Technical Memorandum (TM) in pdf format.

Task 11 – Coordination and Collaboration

• Monthly Progress Meeting Sign-In Sheets, Agendas and Meeting Minutes

• High-level review comments on Cardno’s design • Responses to CMAR comments on their 30% Constructability and Value Engineering

Review

• Responses to CMAR comments on their 60% Constructability and Value Engineering Review

• Comments from reviewing CMAR’s 60% cost estimate • Comments from reviewing CMAR’s 90% cost estimate • PowerPoint Slides

Task 12 – Envision Process Management

• Meeting minutes

• Data request list

• Envision credit Division of Responsibility (DOR) document

• Draft 1st Submission Packet (for City’s review and comments back to A/E) • Final 1st Submission Packet (for City’s review prior to A/E submitting it to ISI) • Draft 2nd Submission Packet (for City’s review and comments back to A/E) • Final 2nd Submission Packet (for City’s review prior to A/E submitting it to ISI)

PROJECT TEAM

The project team includes the following consultants:

08/14/2020 12

Attachment 1 to Appendix A – Scope of Services Northeast Water Reclamation Facility Electrical Distribution System Improvements City of St. Petersburg Project No. 18121-111

A/E:

Black & Veatch Corporation

• Rebecca Oliva, P.E., BCEE, ENV SP, PMP – Project Manager (Primary Point of Contact); Envision Lead

• Andy Westfall, P.E., ENV SP – Project Director

• Ryan Eck., P.E. – Engineering Manager; Civil, Permitting

• Mike Tache, P.E. - Engineering Manager; Process Mechanical

• Richard Taylor, P.E. – Electrical and I&C Lead Engineer

• Ryan Binkley, P.E. – Electrical Engineer

• David Garcia, E.I. – Electrical Engineer

• Brad Vanlandingham, P.E. – Structural Engineer

• Elias Pourladian – Structural Engineer

• Dennis Trupka – Architect

• Michelle Roth – HVAC

• Steven Scott – Engine Generators

• Chad Barker – Cost Estimating

• Brandon Gibbs – BIM/ CAD Manager

• Roger Smith – Collaboration with CMAR

• Jeff Szymanski, P.E. – Lead Acoustical Specialist

• Other support professionals

Subconsultants:

Suncoast Land Surveying, Inc. – Surveying and underground utility locations.

MC Squared, Inc. – Geotechnical investigation and report.

Earth Resources, Inc. – ERP / stormwater permitting & design.

-- End of Scope of Services –

08/14/2020 13

ATTACHMENT 1 TO APPENDIX B - FEE SCHEDULE

NORTHEAST WATER RECLAMATION FACILITY

ELECTRICAL DISTRIBUTION SYSTEM IMPROVEMENTS

CITY OF ST. PETERSBURG, FLORIDA

PROJECT NO. 18121-111

In addition to the fees and costs set forth in Appendix B, the City shall pay the A/E the fees and costs set forth in Attachment 1 to Appendix B, as follows:

I. Staffhour Estimate: All Tasks

Direct Labor Rates Classifications Project Director Project Manager Engineering

Manager

Sr. Engineer I

(Civil)

Staff Engineer III

(Civil)

Sr. Engineer II

(Structural)

Sr. Engineer II

(Build Mech)

Sr. Engineer II

(Proc Mech)

Sr. Engineer II

(Accoustical)

Technical Expert

(Electrical)

Project Engineer

II (Electrical)

Technical Expert

(I&C)

Sr. Engineer I

(I&C) Sr. Architect

Sr. Cost

Estimator Sr. Designer Sr. Technician Technician II

Cost Estimator /

Scheduler

Administrative

Assistant Total

Hours

Labor

Cost Billing Rate $247 $196 $180 $160 $130 $185 $180 $165 $162 $247 $160 $247 $162 $180 $165 $150 $124 $110 $120 $100

TASK

1 Project Setup and Administration -

Additional Services 24 168 46 140 40 418 $67,936.00

7 Field Investigations 4 8 34 16 62 $10,756.00

8 Design Services 34 64 374 16 616 806 338 422 269 1,278 350 372 496 114 22 1,208 1,636 80 8,495 $1,317,261.00

9 Permitting Services 12 42 118 2 12 14 200 $29,066.00

10 Acoustical Study 4 12 24 164 10 214 $33,632.00

11 Coordination and Collaboration 20 146 174 40 94 12 12 12 60 36 12 20 20 40 26 724 $129,440.00

12 Envision Process Management 220 164 210 24 20 20 148 806 $124,100.00

Totals 82 622 846 56 1,078 818 350 458 164 331 1,346 362 392 516 154 22 1,208 1,656 140 318 10,919 $1,712,191.00

II. Fee Calculation

Task Labor

Cost 1Expenses

Subconsultant

Services - QCA Total Cost

1 $67,936.00 $200.00 $0.00 $68,136.00

7 $10,756.00 $0.00 $79,575.00 $90,331.00

8 $1,317,261.00 $12,600.00 $0.00 $1,329,861.00

9 $29,066.00 $1,100.00 $9,460.00 $39,626.00

10 $33,632.00 $3,700.00 $0.00 $37,332.00

11 $129,440.00 $4,000.00 $0.00 $133,440.00

12 $124,100.00 $3,100.00 $0.00 $127,200.00

Total $1,712,191.00 $24,700.00 $89,035.00 $1,825,926.00

III. Fee Limit Lump Sum Cost $1,825,926.00

2Allowance $250,000.00

Total: $2,075,926.00

IV. Notes 1. Includes expenses for: transportation, lodging, out of town travel meals, reproduction, telephone, postage, and courier services.

2. Allowance to be used only upon City's written authorization, billed at a 3.1 salary multiplier plus expenses incurred x 1.0 multiplier.

08/14/20

ATTACHMENT 1 TO APPENDIX C - SCHEDULE NORTHEAST WATER RECLAMATION FACILITY

ELECTRICAL DISTRIBUTION SYSTEM IMPROVEMENTS CITY OF ST. PETERSBURG, FLORIDA

PROJECT NO. 18121-111

In addition to the schedule / milestones set forth in Appendix C, the A/E shall perform the scope

of services set forth in Attachment 1 to Appendix C in accordance with the following schedule /

milestones:

Milestone

Weeks

following

previous

Weeks

following

NTP

NTP 0 0

Task 7 – Field Investigations 2 2

Task 12.1 - Envision Kickoff Meeting 1 3

Task 10.1 - Acoustical Modeling / Site Visit 2 5

Task 8.1 - 30% Design Deliverable 4 9

CMAR selected and under Contract (Performed by City) 0 9

Task 11.2 - 30% Review Meeting (Cardno Design) 1 10

Task 8.1 - 30% Review Meeting (A/E Design) 1 11

Task 11.3 – 30% A/E Responses to CMAR Review Comments 1 12

Task 9.4 – DRC Permitting 0 12

Task 10.1 - Draft Acoustical TM Deliverable 0 12

Task 10.1 - Final Acoustical TM Deliverable 3 15

Task 8.2 - 60% Design Deliverable 7 22

Task 11.2 - 60% Review Meeting (Cardno Design) 2 24

Task 8.2 - 60% Review Meeting (A/E Design) 1 25

Task 11.3 – 60% A/E Responses to CMAR Review Comments

and 60% Cost Estimate Review 1 26

Task 9.2 - 60% FDEP WW Minor Modification Construction

Permit Exemption 1 27

Task 9.3 FDEP ERP Permitting 0 27

Task 12.2 - Draft Envision First Submittal (to City) 5 32

Task 8.3 - 90% Design Deliverable 7 39

Task 11.2 - 90% Review Meeting (Cardno Design) 2 41

Task 8.3 - 90% Review Meeting (A/E Design) 1 42

Task 11.3 – 90% Cost Estimate Review 0 42

Task 12.2 - Envision First Submittal to ISI 4 46

Task 8.4 - 100% Design Deliverable 5 51

Task 9.1 – Building Permit Plans Review 0 51

Task 8.5 – Final Design Deliverable 4 55

Task 12.3 - Draft Envision Second Submittal 3 58

Task 12.3 - Envision Second Submittal to ISI 2 60

08/14/2020

Page 1 of 1

-- City of St. Petersburg Authorization Request --

General Authorization

Request #

70151

Name: Johnson, Sarah B Request Date: 20-AUG-2020 Status: APPROVED

Authorization Request

Subject: Council - 9/3

Message: 18121-111 - Black Veatch - NE Elec - Amend No 1

SupportingDocumentation:

Black Veatch - NE Elec - Amend 1 - Final.pdf

Approver Completed By ResponseResponse

Date Type

0 Johnson, Sarah B SUBMITTED 20-AUG-2020

1 Prayman, Brejesh B Prayman, Brejesh B APPROVE 20-AUG-2020 User Defined

2 McKee, Stacey Pevzner McKee, Stacey Pevzner APPROVE 21-AUG-2020 User Defined

3 Tankersley, Claude Duval Tankersley, Claude Duval APPROVE 21-AUG-2020 User Defined

45

The following page(s) contain the backup material for Agenda Item: Referring to the Public Services

& Infrastructure Committee (PS&I) for an update from City and PSTA staff on potential locations

for new and replacement shelters at the September 10 PS&I committee meeting. (Councilmember

Rice)

Please scroll down to view the backup material.

F-1

F-1

TO: Members of City Council DATE: August 21, 2020 COUNCIL DATE: September 3, 2020 RE: Referral to the Public Services & Infrastructure Committee - Update from

City Staff and PSTA on Plans to Add and Replace Bus Shelters in the City ______________________________________________________________________________ ACTION DESIRED: Respectfully requesting a referral to the Public Services & Infrastructure Committee (PS&I) for an update from City and PSTA staff on potential locations for new and replacement shelters at the September 10 PS&I committee meeting. Additionally, a discussion about the challenges of adding shelters in locations with high ridership but limited right-of-way (ROW). In addition to an update on PSTA’s Shelter Deployment Plan, an update regarding the City’s design standards and average cost for designing each shelter is requested.

Council Member Darden Rice - District 4

CITY COUNCIL AGENDA NEW BUSINESS ITEM

48

The following page(s) contain the backup material for Agenda Item: Referring to PS&I or other

relevant committee for a discussion on office space development throughout the City of St.

Petersburg. (Councilmember Gabbard)

Please scroll down to view the backup material.

TO: Members of City Council

DATE: August 21, 2020

COUNCIL DATE: September 3, 2020

RE: Office Space Development in the City of St. Petersburg

______________________________________________________________________________

ACTION DESIRED:

Respectfully requesting a referral to PS&I or other relevant committee for a discussion on office

space development throughout the City of St Petersburg. Requesting a report that would provide

targets specific to each employment center and or activity center. To include total of all projects

that are coming online, their location and any research or projections available about the impacts

of Covid 19 on office space need going forward.

Brandi Gabbard, Council MemberDistrict 2

CITY COUNCIL AGENDANEW BUSINESS ITEM

50

The following page(s) contain the backup material for Agenda Item: Requesting Legal give an

update to City Council on the upcoming Charter Review Commission at the September 24, 2020

Committee of the Whole meeting. (Chair Montanari)

Please scroll down to view the backup material.

TO: Members of City Council

DATE: August 27, 2020

COUNCIL DATE: September 3, 2020

RE: Charter Review Commission______________________________________________________________________________

ACTION DESIRED:

Respectfully requesting Legal give an update to City Council on the upcoming Charter Review Commission at the September 24, 2020 Committee of the Whole meeting.

Ed Montanari, Chair District 3

CITY COUNCIL AGENDANEW BUSINESS ITEM

52

The following page(s) contain the backup material for Agenda Item: Authorizing the issuance of a

not to exceed $3,000,000 Non-Ad Valorem Revenue Note, Series 2020A to finance the costs of the

acquisition, design, construction, reconstruction, and equipping of capital improvements to various

projects located within the City limits, and to pay associated transactional costs; providing that such

note shall be a limited obligation of the city payable solely from non-ad valorem revenues budgeted

and appropriated as provided herein; providing for the rights, securities and remedies for the owner

of such note; making certain covenants and agreements in connection therewith.

Please scroll down to view the backup material.

25027/047/01639367.DOCv51

RESOLUTION NO. 2020-__

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ST. PETERSBURG, FLORIDA AUTHORIZING THE ISSUANCE OF A NOT TO EXCEED $3,000,000 NON-AD VALOREM REVENUE NOTE, SERIES 2020A TO FINANCE THE COSTS OF THE ACQUISITION, DESIGN, CONSTRUCTION, RECONSTRUCTION, AND EQUIPPING OF CAPITAL IMPROVEMENTS TO VARIOUS PROJECTS LOCATED WITHIN THE CITY LIMITS, AND TO PAY ASSOCIATED TRANSACTIONAL COSTS; PROVIDING THAT SUCH NOTE SHALL BE A LIMITED OBLIGATION OF THE CITY PAYABLE SOLELY FROM NON-AD VALOREM REVENUES BUDGETED AND APPROPRIATED AS PROVIDED HEREIN; PROVIDING FOR THE RIGHTS, SECURITIES AND REMEDIES FOR THE OWNER OF SUCH NOTE; MAKING CERTAIN COVENANTS AND AGREEMENTS IN CONNECTION THEREWITH; AND PROVIDING AN EFFECTIVE DATE.

BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ST. PETERSBURG, FLORIDA:

Section 1: Authority for this Resolution. This Resolution is adopted pursuant to the Constitution of the State of Florida, Chapter 166, Part II, Florida Statutes, the municipal charter of the Issuer and other applicable provisions of law (collectively, the "Act").

Section 2: Definitions. Unless defined in other sections of this Resolution, all capitalized undefined terms shall have the same meanings as set forth in this section. Words importing the singular number shall include the plural number in each case and vice versa.

"Business Day" shall mean any day except any Saturday or Sunday or day on which the Principal Office of the Original Purchaser is lawfully closed.

"Chief Financial Officer" shall mean the Chief Financial Officer of the Issuer, or her designee.

"City Administrator" shall mean the City Administrator of the Issuer, or her designee.

25027/047/01639367.DOCv52

"City Attorney" shall mean the City Attorney or any Assistant City Attorney of the Issuer.

"City Clerk" shall mean the City Clerk or any assistant or deputy City Clerk of the Issuer.

"City Council" shall mean the City Council of the Issuer.

"Code" shall mean the Internal Revenue Code of 1986, as amended, and any Treasury Regulations, whether temporary, proposed or final, promulgated thereunder or applicable thereto.

"Debt Service Fund" shall mean the Debt Service Fund established with respect to the Note pursuant to Section 10 hereof.

"Fiscal Year" shall mean the period commencing on October 1 of each year and continuing through the next succeeding September 30, or such other period as may be prescribed by law.

"Issuer" shall mean the City of St. Petersburg, Florida, a municipal corporation of the State of Florida.

"Maturity Date" shall mean November 1, 2023.

"Mayor" shall mean the Mayor of the Issuer, or his designee. The Mayor is authorized, but is not bound, to designate the Deputy Mayor/City Administrator, the Assistant City Administrator, and/or the Chief Financial Officer to execute certificates, agreements and all other documents in connection with the issuance of the Note.

"Non-Ad Valorem Revenues" shall mean all legally available revenues of the Issuer other than ad valorem tax revenues.

"Note" shall mean the Issuer’s Non-Ad Valorem Revenue Note, Series 2020A authorized by Section 4 hereof.

"Note Counsel" shall mean Bryant Miller Olive P.A., or other nationally recognized bond counsel firm.

"Original Purchaser" shall mean Key Government Finance, Inc.

"Owner" shall mean the Person in whose name or names the Note shall be registered on the books of the Issuer kept for that purpose in accordance with provisions of this Resolution. The Original Purchaser shall be the initial Owner.

25027/047/01639367.DOCv53

"Permitted Lender" shall mean any affiliate of the Original Purchaser or any bank, trust company, savings institution, insurance company or qualified institutional buyer under Rule 144A promulgated under the Securities Act of 1933.

"Person" shall mean natural persons, firms, trusts, estates, associations, corporations, partnerships and public bodies.

"Pledged Revenues" shall mean the Non-Ad Valorem Revenues budgeted, appropriated and deposited in the Debt Service Fund and any proceeds of the Note on deposit in the Project Fund as provided herein.

"Principal Office" shall mean with respect to the Original Purchaser, the office located at 1000 South McCaslin Boulevard, Superior, Colorado 80027, or such other office as the Original Purchaser may designate to the Issuer in writing.

"Project" shall mean, collectively, the acquisition, design, construction, reconstruction, and equipping of capital improvements to various projects located within the city limits of the Issuer, including, but not limited to body worn cameras and associated support equipment, software, and storage, all in accordance with plans on file at the offices of the Issuer, as such plans may be modified from time to time.

"Project Fund" shall mean the Project Fund established with respect to the Note pursuant to Section 11 hereof.

"Resolution" shall mean this Resolution, pursuant to which the Note is authorized to be issued, including any supplemental resolution(s).

"State" shall mean the State of Florida.

Section 3: Findings.

(A) For the benefit of its citizens, the Issuer finds, determines and declares that it is beneficial for the continued preservation of the welfare and convenience of the Issuer and its citizens to finance the costs of the Project.

(B) Debt service on the Note will be secured by a covenant to budget, appropriate and deposit Non-Ad Valorem Revenues as provided herein. The Pledged Revenues will be sufficient to pay the principal and interest on the Note herein authorized, as the same become due, and to make all deposits required by this Resolution.

(C) The Issuer shall never be required to levy ad valorem taxes or use the proceeds thereof to pay debt service on the Note or to make any other payments to be made hereunder or to maintain or continue any of the activities of the Issuer which generate user service charges, regulatory fees or any Non-Ad Valorem Revenues. The Note shall not constitute a lien on any property owned by or situated within the city limits of the Issuer other than the Pledged Revenues.

25027/047/01639367.DOCv54

(D) It is estimated that the Non-Ad Valorem Revenues will be available after satisfying funding requirements for obligations having an express lien on or pledge thereof and after satisfying funding requirements for essential governmental services of the Issuer, in amounts sufficient to provide for the payment of the principal of and interest on the Note and all other payment obligations hereunder.

(E) The Issuer, after soliciting proposals in response to a request for loan proposals distributed by the Issuer on July 13, 2020 for financing the costs of the Project and receiving multiple responses complying with the structure described in such request, has selected the Original Purchaser to purchase the Note.

Section 4: Authorization of Note and Project. Subject and pursuant to the provisions of this Resolution, an obligation of the Issuer to be known as the “City of St. Petersburg, Florida Non-Ad Valorem Revenue Note, Series 2020A” is hereby authorized to be issued under and secured by this Resolution in the principal amount of a not to exceed $3,000,000 for the purpose of financing the costs of the Project, and paying the costs of issuing the Note. The use of the proceeds of the Note as heretofore described is authorized. The Project is also hereby authorized.

Because of the characteristics of the Note, prevailing market conditions, and additional savings to be realized from an expeditious sale of the Note, it is in the best interest of the Issuer to accept the offer of the Original Purchaser to purchase the Note at a private negotiated sale, which was based upon a competitive selection process. Prior to the issuance of the Note, the Issuer shall receive from the Original Purchaser a Purchaser’s Certificate, in substantially the form attached hereto as Exhibit B and a Disclosure Letter containing the information required by Section 218.385, Florida Statutes, in substantially the form attached hereto as Exhibit C.

Section 5: This Resolution to Constitute Contract. In consideration of the acceptance of the Note authorized to be issued hereunder by those who shall hold the same from time to time, this Resolution shall be deemed to be and shall constitute a contract between the Issuer and the Owner.

Section 6: Description of the Note. The Note shall be dated the date of its execution and delivery, which shall be a date agreed upon by the Issuer and the Original Purchaser, subject to the following terms:

(A) Interest Rate. The Note shall have a fixed interest rate equal to 0.956% per annum (subject to adjustment upon the occurrence of certain events as provided in the Note) (calculated on a 30/360 day count basis).

(B) Principal and Interest Payment Dates. Interest on the Note shall be paid semi-annually on each May 1 and November 1, commencing May 1, 2021. Principal on the Note shall be paid in the amounts and on the dates set forth in the Note with a final maturity date of the Maturity Date.

25027/047/01639367.DOCv55

(C) Prepayment of the Note. The Note shall be subject to prepayment as described in the Note.

(D) Form of the Note. The Note is to be in substantially the form set forth in Exhibit A attached hereto, together with such non-material changes as shall be approved by the Mayor, such approval to be conclusively evidenced by the execution thereof by the Mayor.

(E) Original Denomination of the Note. The Note shall originally be issued in a single denomination equal to the original principal amount authorized hereunder.

Section 7: Execution and Delivery of Note. The Note shall be executed in the name of the Issuer by its Mayor and attested by its City Clerk, subject to the approval of the City Attorney as to form and correctness, and the corporate seal of the Issuer or a facsimile thereof shall be affixed thereto or reproduced thereon. In case any one or more of the officers of the Issuer who shall have signed or sealed the Note shall cease to be such officer or officers of the Issuer before the Note so signed and sealed shall have been actually sold and delivered, such Note may nevertheless be sold and delivered as if the persons who signed or sealed such Note had not ceased to hold such offices. The Note may be signed and sealed on behalf of the Issuer by such person who at the actual time of the execution of such Note shall hold the proper office, although at the date of such execution of the Note such person may not have held such office or may not have been so authorized.

Section 8: Registration and Exchange of the Note; Persons Treated as Owner. The Note is initially registered to the Original Purchaser. So long as the Note shall remain unpaid, the Issuer will keep books for the registration and transfer of the Note. The Note shall be transferable only upon such registration books. Notwithstanding anything herein to the contrary, the Owner may in the future make transfers of the Note or sell participations to Permitted Lenders, without the consent of the Issuer; provided, however, such transfers or participations may only be made in whole, and not in part.

The Person in whose name the Note shall be registered shall be deemed and regarded as the absolute Owner thereof for all purposes, and payment of principal and interest on such Note shall be made only to or upon the written order of the Owner. All such payments shall be valid and effectual to satisfy and discharge the liability upon such Note to the extent of the sum or sums so paid.

Section 9: Payment of Principal and Interest; Limited Obligation. The Issuer promises that it will promptly pay the principal of and interest on the Note at the place, on the dates and in the manner provided therein according to the true intent and meaning hereof and thereof. The Note is secured by a pledge of and lien upon the Pledged Revenues in the manner and to the extent described herein. The Note shall not be or constitute a general obligation or indebtedness of the Issuer as a "bond" within the meaning of Article VII, Section 12 of the Constitution of Florida, but shall be payable solely from the Pledged Revenues in accordance

25027/047/01639367.DOCv56

with the terms hereof. No Owner shall ever have the right to compel the exercise of any ad valorem taxing power or the use of ad valorem tax revenues to pay such Note, or be entitled to payment of such Note from any funds of the Issuer except from the Pledged Revenues as described herein.

Section 10: Covenant to Budget and Appropriate. (A) Subject to the next paragraph, the Issuer covenants and agrees and has a positive and affirmative duty to appropriate in its annual budget, by amendment, if necessary, from Non-Ad Valorem Revenues, and to deposit into the Debt Service Fund hereinafter created, amounts sufficient to pay principal of and interest on the Note not being paid from other amounts as the same shall become due. Such covenant and agreement on the part of the Issuer to budget, appropriate and deposit such amounts of Non-Ad Valorem Revenues shall be cumulative to the extent not paid, and shall continue until such Non-Ad Valorem Revenues or other legally available funds in amounts sufficient to make all such required payments shall have been budgeted, appropriated, deposited and actually paid. No lien upon or pledge of such budgeted Non-Ad Valorem Revenues shall be in effect until such monies are budgeted, appropriated and deposited as provided herein. The Issuer further acknowledges and agrees that the obligations of the Issuer to include the amount of such amendments in each of its annual budgets and to pay such amounts from Non-Ad Valorem Revenues may be enforced in a court of competent jurisdiction in accordance with the remedies set forth herein.

Until such monies are budgeted, appropriated and deposited as provided herein, such covenant to budget and appropriate does not create any lien upon or pledge of such Non-Ad Valorem Revenues, nor does it preclude the Issuer from pledging in the future its Non-Ad Valorem Revenues (except as provided in Section 19 hereof), nor does it require the Issuer to levy and collect any particular Non-Ad Valorem Revenues, nor does it give the Owner a prior claim on the Non-Ad Valorem Revenues as opposed to claims of general creditors of the Issuer. Such covenant to budget and appropriate Non-Ad Valorem Revenues is subject in all respects to the prior payment of obligations secured by a lien on and pledge of specific components of the Non-Ad Valorem Revenues heretofore or hereafter entered into (including the payment of debt service on bonds and other debt instruments). Anything in this Resolution to the contrary notwithstanding, it is understood and agreed that all obligations of the Issuer hereunder shall be payable solely from the portion of Non-Ad Valorem Revenues budgeted, appropriated and deposited as provided for herein and nothing herein shall be deemed to pledge ad valorem tax power or ad valorem taxing revenues or to permit or constitute a mortgage or lien upon any assets owned by the Issuer and no holder of the Note nor any other person, may compel the levy of ad valorem taxes on real or personal property within the boundaries of the Issuer or the use or application of ad valorem tax revenues in order to satisfy any payment obligations hereunder or to maintain or continue any of the activities of the Issuer which generate user service charges, regulatory fees, or any other Non-Ad Valorem Revenues. Notwithstanding any provisions of this Resolution or the Note to the contrary, the Issuer shall never be obligated to maintain or continue any of the activities of the Issuer which generate user service charges, regulatory fees or any Non-Ad Valorem Revenues. The Issuer is prohibited by law from expending moneys not appropriated or in excess of its current budgeted revenues and surpluses. Until such monies are budgeted, appropriated and deposited as provided herein, neither this Resolution nor the obligations of the Issuer hereunder shall be construed as a pledge of or a lien on all or any legally

25027/047/01639367.DOCv57

available Non-Ad Valorem Revenues of the Issuer, but shall be payable solely as provided herein subject to the availability of Non-Ad Valorem Revenues after satisfaction of funding requirements for obligations having an express lien on or pledge of such revenues and funding requirements for essential governmental services of the Issuer.

There is hereby created and established the "City of St. Petersburg, Florida Non-Ad Valorem Revenue Note, Series 2020A Debt Service Fund," which fund shall be a trust fund held by the Chief Financial Officer, which shall be held solely for the benefit of the Owner. The Debt Service Fund shall be deemed to be held in trust for the purposes provided herein for such Debt Service Fund. The money in such Debt Service Fund shall be continuously secured in the same manner as state and municipal deposits are authorized to be secured by the laws of the State. The designation and establishment of the Debt Service Fund in and by this Resolution shall not be construed to require the establishment of a completely independent, self-balancing fund as such term is commonly defined and used in governmental accounting, but rather is intended solely to constitute an earmarking of certain revenues and assets of the Issuer for certain purposes and to establish certain priorities for application of such revenues and assets as herein provided. The Issuer may at any time and from time to time appoint one or more depositaries to hold, for the benefit of the Owner, the Debt Service Fund established hereby. Such depository or depositaries shall perform at the direction of the Issuer the duties of the Issuer in depositing, transferring and disbursing moneys to and from such Debt Service Fund as herein set forth, and all records of such depository in performing such duties shall be open at all reasonable times to inspection by the Issuer and its agent and employees. Any such depository shall be a bank or trust company duly authorized to exercise corporate trust powers and subject to examination by federal or state authority, of good standing, and having a combined capital, surplus and undivided profits aggregating not less than fifty million dollars ($50,000,000).

(B) Until applied in accordance with this Resolution, the Non-Ad Valorem Revenues of the Issuer on deposit in the Debt Service Fund and other amounts on deposit from time to time therein, plus any earnings thereon, are pledged to the repayment of the Note.

Section 11. Application of Proceeds of Note. The proceeds received from the sale of the Note shall be applied by the Issuer simultaneously with the delivery of the Note to the Original Purchaser, as follows:

(1) The Issuer shall pay all costs and expenses in connection with the preparation, issuance and sale of the Note; and

(2) Remaining proceeds shall be deposited in the Project Fund.

The Issuer covenants and agrees to establish a special fund to be designated "City of St. Petersburg, Florida Non-Ad Valorem Revenue Note, Series 2020A, Project Fund." The designation and establishment of the Project Fund by this Resolution shall not be construed to require the establishment of a completely independent, self-balancing fund as such term is commonly defined and used in governmental accounting, but rather is intended solely to constitute an earmarking of certain assets of the Issuer for certain purposes and to establish certain priorities for application of such assets as herein provided. Amounts on deposit from

25027/047/01639367.DOCv58

time to time in the Project Fund, plus any earnings thereon, are pledged to the repayment of the Note. Costs of the Project will be paid from the Project Fund.

Section 12: Tax Covenant. The Issuer covenants to the Owner provided for in this Resolution that the Issuer will not make any use of the proceeds of the Note at any time during the term of the Note which, if such use had been reasonably expected on the date the Note was issued, would have caused such Note to be "arbitrage bonds" within the meaning of the Code. The Issuer will comply with the requirements of the Code and any valid and applicable rules and regulations promulgated thereunder necessary to ensure the exclusion of interest on the Note from the gross income of the holders thereof for purposes of federal income taxation.

Section 13: Amendment. This Resolution shall not be modified or amended in any respect subsequent to the issuance of the Note, except with the written consent of the Owner of a majority in outstanding principal amount of the Note.

Section 14: Limitation of Rights. With the exception of any rights herein expressly conferred, nothing expressed or mentioned in or to be implied from this Resolution or the Note is intended or shall be construed to give to any person other than the Issuer and the Owner any legal or equitable right, remedy or claim under or with respect to this Resolution or any covenants, conditions and provisions herein contained. This Resolution and all of the covenants, conditions and provisions hereof being intended to be and being for the sole and exclusive benefit of the Issuer and the Owner.

Section 15: Note Mutilated, Destroyed, Stolen or Lost. In case the Note shall become mutilated, or be destroyed, stolen or lost, the Issuer shall issue and deliver the new Note of like tenor as the Note so mutilated, destroyed, stolen or lost, in exchange and in substitution for such mutilated Note, or in lieu of and in substitution for the Note destroyed, stolen or lost and upon the Owner furnishing the Issuer proof of ownership thereof and indemnity reasonably satisfactory to the Issuer and complying with such other reasonable regulations and conditions as the Issuer may prescribe and paying such expenses as the Issuer may incur. The Note so surrendered shall be canceled.

Section 16: Impairment of Contract. The Issuer covenants with the Owner that it will not, without the written consent of the Owner of a majority in outstanding principal amount of the Note, enact any ordinance or adopt any resolution which repeals, impairs or amends in any manner adverse to the Owner the rights granted to the Owner hereunder.

Section 17: Financial Information. Not later than 270 days following the close of each Fiscal Year, the Issuer shall provide the Owner with an electronic copy of its Comprehensive Annual Financial Report including annual financial statements for each Fiscal Year of the Issuer, prepared in accordance with applicable law and generally accepted accounting principles. All accounting terms not specifically defined or specified herein shall have the meanings attributed to such terms under generally accepted accounting principles as in effect from time to time, consistently applied.

25027/047/01639367.DOCv59

Section 18: Events of Default; Remedies of Owner. The following shall constitute "Events of Default": (i) if the Issuer fails to pay any payment of principal of or interest on the Note or other debt payable from any Non-Ad Valorem Revenues as the same becomes due and payable; (ii) if the Issuer defaults in the performance or observance of any covenant or agreement contained in this Resolution or the Note (other than set forth in (i) above) and fails to cure the same within thirty (30) days following notice thereof or from the date when the Issuer was required under Section 17 to provide the financial information required thereunder to the Owner; or (iii) filing of a petition by or against the Issuer relating to bankruptcy, reorganization, arrangement or readjustment of debt of the Issuer or for any other relief relating to the Issuer under the United States Bankruptcy Code, as amended, or any other insolvency act or law now or hereafter existing, or the involuntary appointment of a receiver or trustee for the Issuer, and the continuance of any such event for 90 days undismissed or undischarged.

Upon the occurrence and during the continuation of any Event of Default, the Owner may, in addition to any other remedies set forth in this Resolution or the Note, either at law or in equity, by suit, action, mandamus or other proceeding in any court of competent jurisdiction, protect and enforce any and all rights under the laws of the State, or granted or contained in this Resolution, and may enforce and compel the performance of all duties required by this Resolution, or by any applicable statutes to be performed by the Issuer.

Section 19: Anti-Dilution Test. The Issuer may incur additional debt secured by all or a portion of the Non-Ad Valorem Revenues only if the total amount of Non-Ad Valorem Revenues for the prior Fiscal Year were at least 2.00 times the maximum annual debt service of all debt to be paid from Non-Ad Valorem Revenues (collectively, "Debt"), including any Debt payable from one or several specific revenue sources.

For purposes of calculating maximum annual debt service if the terms of the Debt are such that interest thereon for any future period of time is to be calculated at a rate which is not then susceptible of precise determination ("Variable Rate Debt"), interest on such Variable Rate Debt shall be computed as follows:

(a) if the principal amount of Variable Rate Debt (including any Variable Rate Debt proposed to be incurred) is less than or equal to 25% of the principal amount of all Debt (including the Debt proposed to be incurred), an interest rate equal to the higher of 12% per annum or The Bond Buyer 40 Index shall be assumed; or

(b) if the principal amount of Variable Rate Debt (including any Variable Rate Debt proposed to be incurred) is more than 25% of the principal amount of all Debt (including the Debt proposed to be incurred), the maximum rate which could be borne by such Variable Rate Debt shall be assumed.

For purposes of calculating maximum annual debt service, balloon indebtedness shall be assumed to amortize in up to 20 years (from the date of calculation) on a level debt service basis. In the event that the Issuer is required to fund a reserve fund, the funding of such reserve fund shall be included in the calculation of debt service. For purposes of this paragraph,

25027/047/01639367.DOCv510

“balloon indebtedness” includes indebtedness if 25% or more of the principal amount thereof comes due in any one year.

Section 20: Severability. If any one or more of the covenants, agreements or provisions of this Resolution should be held contrary to any express provision of law or contrary to the policy of express law, though not expressly prohibited or against public policy, or shall for any reason whatsoever be held invalid, then such covenants, agreements or provisions shall be null and void and shall be deemed separate from the remaining covenants, agreements or provisions of this Resolution or of the Note issued thereunder.

Section 21: Business Days. In any case where the due date of interest on or principal of Note is not a Business Day, then payment of such principal or interest need not be made on such date but may be made on the next succeeding Business Day, provided that credit for payments made shall not be given until the payment is actually received by the Owner.

Section 22: Applicable Provisions of Law. This Resolution shall be governed by and construed in accordance with the laws of the State.

Section 23: Rules of Interpretation. Unless expressly indicated otherwise, references to sections or articles are to be construed as references to sections or articles of this instrument as originally executed. Use of the words "herein," "hereby," "hereunder," "hereof," "hereinbefore," "hereinafter" and other equivalent words refer to this Resolution and not solely to the particular portion in which any such word is used.

Section 24: Captions. The captions and headings in this Resolution are for convenience only and in no way define, limit or describe the scope or intent of any provisions or sections of this Resolution.

Section 25: Members of the City Council Not Liable. No covenant, stipulation, obligation or agreement contained in this Resolution shall be deemed to be a covenant, stipulation, obligation or agreement of any present or future member, agent or employee of the Issuer in his or her individual capacity, and neither the members of the City Council nor any person executing the Note shall be liable personally on the Note or this Resolution or shall be subject to any personal liability or accountability by reason of the issuance or the execution of the Note or this Resolution.

Section 26: Authorizations. The members of the City Council, the Mayor, the City Administrator, the Chief Financial Officer, the City Attorney, the City Clerk and any other employees of the Issuer are hereby authorized to perform all acts and things required of them by this Resolution or desirable or consistent with the requirements hereof for the full, punctual and complete performance of all of the terms, covenants and agreements contained in the Note and this Resolution, and they are hereby authorized to execute and deliver all documents which shall be required by the Note Counsel or the Original Purchaser to effectuate the sale of the Note. All action taken to date by the members of the City Council, the Mayor, the City Administrator, the Chief Financial Officer, the City Attorney, the City Clerk and any other employees of the Issuer in furtherance of the issuance of the Note is hereby approved, confirmed and ratified.

25027/047/01639367.DOCv511

Section 27: Governing Law; Jury Trial Waiver: Applicable Law and Venue. This Resolution and the Note shall be governed by the laws of the State. The Issuer and the Owner, by acceptance of the Note, knowingly, voluntarily, and intentionally waive any right either may have to a trial by jury, with respect to any litigation or legal proceedings based on or arising out of this Resolution or the Note. In the event of any legal proceeding arising out of or related to the Note, the Issuer and the Owner, by acceptance of the Note, each waive any objections to venue for any action brought in state court lying in Pinellas County, St. Petersburg Division. The Issuer and the Owner, by acceptance of the Note, also each waive any objection to venue for any action brought in federal court lying in the Middle District of Florida, Tampa Division. The Owner, by acceptance of the Note, and the Issuer each consent to the personal jurisdiction of the aforementioned courts and irrevocably waive any objections to said jurisdiction.

Section 28: Waiver. No consent or waiver, express or implied, to or of any breach or default in the performance of any obligation hereunder will constitute a consent or waiver to or of any other breach or default in the performance of the same or any other obligation.

Section 29: Superseding of Inconsistent Resolutions. This Resolution supersedes all prior action of City Council inconsistent herewith. All resolutions or parts thereof in conflict herewith are hereby superseded to the extent of such conflict.

Section 30: Effective Date. This Resolution shall become effective immediately upon its adoption.

LEGAL: DEPARTMENT:

25027/047/01639367.DOCv5 A-1

EXHIBIT A

[FORM OF NOTE]

Dated Date: September 25, 2020 $3,000,000

Interest Rate 0.956% (subject to adjustment as described herein)

STATE OF FLORIDA CITY OF ST. PETERSBURG, FLORIDA

NON-AD VALOREM REVENUE NOTE, SERIES 2020A

KNOW ALL MEN BY THESE PRESENTS that the City of St. Petersburg, Florida (the "Issuer"), a municipal corporation created and existing pursuant to the Constitution and the laws of the State of Florida, for value received, promises to pay from the sources hereinafter provided, to the order of KEY GOVERNMENT FINANCE, INC., or registered assigns (hereinafter, the "Owner"), the principal sum of $3,000,000, on the dates and in the amounts as hereinafter described, together with interest on the principal balance at the "Interest Rate" described below, calculated on a 360-day year comprised of twelve 30-day months, however, that such Interest Rate shall in no event exceed the maximum interest rate permitted by applicable law. The Issuer’s Non-Ad Valorem Revenue Note, Series 2020A (this “Note”) shall have a final "Maturity Date" of November 1, 2023.

The Interest Rate is equal to 0.956% (subject to adjustment as described herein).

Interest shall be payable to the Owner on each May 1 and November 1, commencing on May 1, 2021.

A final payment in the amount of the remaining principal balance, together with all accrued and unpaid interest hereon, shall be due and payable in full on the Maturity Date.

This Note shall be subject to prepayment at the option of the Issuer on any date in whole, but not in part, without penalty or premium, by paying to the Owner the principal amount on this Note being prepaid, together with the unpaid interest accrued to the date of such prepayment.

All payments by the Issuer pursuant to this Note shall apply first to accrued interest, then to other charges due the Owner, and the balance thereof shall apply to principal.

THIS NOTE DOES NOT CONSTITUTE A GENERAL INDEBTEDNESS OF THE ISSUER WITHIN THE MEANING OF ANY CONSTITUTIONAL, STATUTORY OR CHARTER PROVISION OR LIMITATION, AND IT IS EXPRESSLY AGREED BY THE OWNER THAT SUCH OWNER SHALL NEVER HAVE THE RIGHT TO REQUIRE OR COMPEL THE EXERCISE OF THE AD VALOREM TAXING POWER OF THE ISSUER OR TAXATION OF ANY REAL OR PERSONAL PROPERTY THEREIN OR THE USE OF AD VALOREM TAX REVENUES FOR THE PAYMENT OF THE PRINCIPAL OF AND INTEREST ON THIS NOTE OR THE MAKING OF ANY OTHER PAYMENTS PROVIDED FOR IN THE RESOLUTION.

25027/047/01639367.DOCv5 A-2

This Note is issued pursuant to Constitution of the State of Florida, Chapter 166, Part II, Florida Statutes, the municipal charter of the Issuer and other applicable provisions of law, and a resolution duly adopted by the Issuer on September 3, 2020, as amended and supplemented from time to time (herein referred to as the "Resolution"), and is subject to all the terms and conditions of the Resolution. All terms, conditions and provisions of the Resolution including, without limitation, remedies in the Event of Default are by this reference thereto incorporated herein as a part of this Note. Payment of this Note is secured by a covenant to budget, appropriate and deposit Non-Ad Valorem Revenues of the Issuer and, a pledge of and lien upon the Pledged Revenues, in the manner and to the extent described in the Resolution. Terms used herein in capitalized form and not otherwise defined herein shall have the meanings ascribed thereto in the Resolution.

Unless earlier prepaid, the principal amount of this Note shall be paid in the following amounts on the following dates:

Dates Amounts 11/01/2021 $990,000 11/01/2022 1,000,000 11/01/2023 1,010,000

In the event of a Determination of Taxability, “Interest Rate” means a per annum rate equal to the Taxable Rate, effective retroactively to the date on which the interest payable on this Note is includable for federal income tax purposes in the gross income of the Owner.

"Determination of Taxability" means the circumstance of interest paid or payable on this Note becoming includable for federal income tax purposes in the gross income of the Owner as a consequence of any act or omission of the Issuer or any written misrepresentation of a covenant of the Issuer in the Resolution. A "Determination of Taxability" shall be deemed to occur upon (i) the issuance by the Internal Revenue Service of a statutory notice of deficiency or other written notification which holds in effect that the interest payable on this Note is includable for federal income tax purposes in the gross income of the Owner, or (ii) a determination by a court of competent jurisdiction that the interest payable on this Note is includable for federal income tax purposes in the gross income of the Owner, which determination either is final and non-appealable or is not appealed within the requisite time period for appeal, or (iii) the admission in writing by the Issuer or an opinion of Note Counsel to the effect that interest on this Note is includable for federal income tax purposes in the gross income of the Owner.

For all purposes of this definition, a Determination of Taxability will be deemed to occur on the date as of which the interest on this Note is deemed includable in the gross income of the Owner. A Determination of Taxability shall not occur solely from the fact that such interest is taken into account in determining adjusted current earnings for the purpose of the alternative minimum income tax imposed on corporations. In addition to any other amounts to be paid hereunder, the Owner or any former Owner, as appropriate, shall be paid an amount equal to any additions to tax, interest and penalties, and any arrears in interest that are required to be paid to the United States of America by the Owner or any former Owner as a result of such Determination of Taxability. All such additional interest, additions to tax, penalties and interest shall be paid by the Issuer within thirty (30) days following the Determination of Taxability and demand by the Owner.

25027/047/01639367.DOCv5 A-3

"Taxable Rate" shall mean the lesser of (i) 1.211% per annum or (ii) the maximum interest rate permitted by applicable law.

If any amount payable to the Owner hereunder is not paid on the due date, such delinquent amount shall bear interest at the Default Rate, and if such delinquent amount is not repaid within 90 days of the due date, the entire principal amount of this Note shall bear interest at the Default Rate until such payment default has been cured. For purposes of this Note, the term "Default Rate" shall mean the lesser of (i) the sum of (A) the then current interest rate on this Note and (B) 3% per annum or (ii) the maximum interest rate permitted by applicable law.

This Note may only be exchanged or transferred, in whole, and not in part, by the Owner hereof to any Permitted Lender but only upon the registration books maintained by the Issuer and in the manner provided in the Resolution.

The Issuer to the extent permitted by law hereby waives presentment, demand, protest and notice of dishonor.

It is hereby certified, recited and declared that all acts, conditions and prerequisites required to exist, happen and be performed precedent to and in the execution, delivery and the issuance of this Note do exist, have happened and have been performed in due time, form and manner as required by law, and that the issuance of this Note is in full compliance with and does not exceed or violate any constitutional or statutory limitation.

IN WITNESS WHEREOF, the City of St. Petersburg, Florida, has issued this Note and has caused the same to be executed by its Mayor, attested by its City Clerk, approved as to form and correctness by its Managing Assistant City Attorney, either manually or with their facsimile signatures, and the corporate seal of the Issuer, or a facsimile thereof to be impressed, imprinted or otherwise reproduced hereon, all as of the dated date set forth above.

CITY OF ST. PETERSBURG, FLORIDA (SEAL)

Rick Kriseman, Mayor ATTESTED:

Chan Srinivasa, City Clerk

APPROVED AS TO FORM AND CORRECTNESS

Macall D. Dyer, Managing Assistant City Attorney

25027/047/01639367.DOCv5 B-1

EXHIBIT B

FORM OF PURCHASER'S CERTIFICATE

This is to certify that Key Government Finance, Inc. (the "Purchaser") has not required the City of St. Petersburg, Florida (the "Issuer") to deliver any offering document and has conducted its own investigation, to the extent it deems satisfactory or sufficient, into matters relating to business affairs or conditions (either financial or otherwise) of the Issuer in connection with the issuance by the Issuer of its $3,000,000 Non-Ad Valorem Revenue Note, Series 2020A (the "Note"). No inference should be drawn that the Purchaser, in the acceptance of said Note, is relying on Note Counsel or the City Attorney as to any such matters other than the legal opinions rendered by Note Counsel and by the Managing Assistant City Attorney, Macall D. Dyer, Esq. ("General Counsel"). Any capitalized undefined terms used herein not otherwise defined shall have the meaning set forth in a resolution adopted by the City Council of the Issuer on September 3, 2020 (the "Resolution").

We are aware that investment in the Note involves various risks, that the Note is not a general obligation of the Issuer or payable from ad valorem tax revenues, and that the payment of the Note is secured solely from the sources described in the Resolution (the "Note Security").

We are a sophisticated investor and have made such independent investigation of the Note Security as we, in the exercise of sound business judgment, consider to be appropriate under the circumstances. We have been provided access to and have reviewed all information about the Issuer we deemed necessary. In making our lending decision, we have relied upon the accuracy of information which has been provided to us by the Issuer and PFM Financial Advisors LLC, the Issuer’s financial advisor (the “Financial Advisor”).We acknowledge that the Financial Advisor is not acting as a placement agent. Documentation for the Note will be provided by the Note Counsel. We have knowledge and experience in financial and business matters and are capable of evaluating the merits and risks of our investment in the Note and can bear the economic risk of our investment in the Note.

We acknowledge that the Resolution is not being qualified under the Trust Indenture Act of 1939, as amended (the "1939 Act"), and is not being registered, in reliance upon the exemption from registration under Section 3(a)(2) of the Securities Act of 1933, Section 517.051(1), Florida Statutes, and/or Section 517.061(7), Florida Statutes, and that neither the Issuer, Note Counsel nor the General Counsel shall have any obligation to effect any such registration or qualification.

We acknowledge that no CUSIP numbers or credit ratings have been obtained with respect to the Note. We are not acting as a broker or other intermediary, and are purchasing the Note as investments for our own account and not with a present view to a resale or other distribution to the public. We understand that the Note may be transferred only in whole and not in part; provided, however, we understand that the Note may only be transferred in accordance with the limitations set forth in the Resolution.

25027/047/01639367.DOCv5 B-2

We are a bank (or wholly-owned subsidiary of a bank), trust company, savings institution, insurance company, dealer, investment company, pension or profit-sharing trust, or qualified institutional buyer as contemplated by Section 517.061(7), Florida Statutes. We are not purchasing the Note for the direct or indirect promotion of any scheme or enterprise with the intent of violating or evading any provision of Chapter 517, Florida Statutes.

We are an "accredited investor" within the meaning of the Securities Act of 1933, as amended, and Regulation D thereunder.

DATED this 25th day of September, 2020.

KEY GOVERNMENT FINANCE, INC.

By: Name: Title:

25027/047/01639367.DOCv5D-1

EXHIBIT C

FORM OF DISCLOSURE LETTER

Following a competitive selection process, the undersigned, as purchaser, proposes to negotiate with City of St. Petersburg, Florida (the "Issuer") for the private purchase of its $3,000,000 Non-Ad Valorem Revenue Note, Series 2020A (the “Note”). Prior to the award of the Note, the following information is hereby furnished to the Issuer:

1. Set forth is an itemized list of the nature and estimated amounts of expenses to be incurred for services rendered to us (the "Purchaser") in connection with the issuance of the Note (such fees and expenses to be paid by the Issuer):

$7,500 Kutak Rock, Purchaser's Counsel

Legal Fees

2. (a) No other fee, bonus or other compensation is estimated to be paid by the Purchaser in connection with the issuance of the Note to any person not regularly employed or retained by the Purchaser (including any "finder" as defined in Section 218.386(1)(a), Florida Statutes), except as specifically enumerated as expenses to be incurred by the Purchaser, as set forth in paragraph (1) above.

(b) No person has entered into an understanding with the Purchaser, or to the knowledge of the Purchaser, with the Issuer, for any paid or promised compensation or valuable consideration, directly or indirectly, expressly or implied, to act solely as an intermediary between the Issuer and the Purchaser or to exercise or attempt to exercise any influence to effect any transaction in the purchase of the Note. It is our understanding that the City’s Bond Counsel and Financial Advisor are being paid from costs of issuance financed with the proceeds of the Note for services rendered on this transaction.

3. The amount of the underwriting spread expected to be realized by the Purchaser is $0.

4. The management fee to be charged by the Purchaser is $0.

5. Truth-in-Bonding Statement:

You have disclosed to us that the Note is being issued primarily to finance the acquisition, design, construction, reconstruction, and equipping of capital improvements to various projects located within the city limits of the Issuer, including, but not limited to body worn cameras and associated support equipment, software, and storage, all in accordance with plans on file at the offices of the Issuer, as such plans may be modified from time to time.

25027/047/01639367.DOCv5D-2

Unless earlier prepaid, the Note is expected to be repaid by November 1, 2023; at an interest rate of 0.956%, total interest paid over the life of the Note is estimated to be $60,419.20.

The Note will be payable solely from a covenant to budget, appropriate and deposit from Non-Ad Valorem Revenues sufficient to make such payments, appropriated and deposited as described in a resolution of the Issuer adopted on September 3, 2020 (the "Resolution"). See the Resolution for a definition of Non-Ad Valorem Revenues. Issuance of the Note is estimated to result in an annual average of approximately $987,232.00 of revenues of the Issuer not being available to finance the other services of the Issuer during the life of the Note. This paragraph is provided pursuant to Section 218.385, Florida Statutes.

6. The name and address of the Purchaser is as follows:

Key Government Finance, Inc. 1000 South McCaslin Boulevard Superior, Colorado 80027

IN WITNESS WHEREOF, the undersigned has executed this Disclosure Letter on behalf of the Purchaser this 25th day of September, 2020.

KEY GOVERNMENT FINANCE, INC.

By: Name: Title:

71

The following page(s) contain the backup material for Agenda Item: A Resolution of the City

Council of the City of St. Petersburg, Florida supporting the establishment of an independent St.

Petersburg Food Policy Council (“Food Policy Council”) by the Foundation for a Healthy St.

Petersburg.

Please scroll down to view the backup material.

RESOLUTION NO. _______

A RESOLUTION OF THE CITY COUNCIL OF

THE CITY OF ST. PETERSBURG, FLORIDA

SUPPORTING THE ESTABLISHMENT OF AN

INDEPENDENT ST. PETERSBURG FOOD

POLICY COUNCIL (“FOOD POLICY

COUNCIL”) BY THE FOUNDATION FOR A

HEALTHY ST. PETERSBURG; AND

PROVIDING AN EFFECTIVE DATE.

WHEREAS, the St. Petersburg City Council (“City Council”) has an interest in improving

the health and quality of life of all citizens in St. Petersburg; and

WHEREAS, food system issues significantly affect public health and quality of life; and

WHEREAS, food security is a necessity of life, and the City Council recognizes that all St.

Petersburg citizens should be able to obtain a safe, nutritionally adequate diet through a sustainable

food system; and

WHEREAS, optimal health outcomes for St. Petersburg citizens are diminished due to

racial and socioeconomic inequities in the city’s food system; and

WHEREAS, 134,650 persons are food insecure in Pinellas County, which equates to 14.2

percent of the population; and

WHEREAS, 13.5 percent of Pinellas County Community Health Needs Assessment survey

respondents indicated that they ate less than they felt they should because of lack of money; and

WHEREAS, 24.9 percent of Pinellas County Community Health Needs Assessment survey

respondents had no place to go for food when money was tight; and

WHEREAS, the U.S. Department of Agriculture (USDA) has identified census tracts in

St. Petersburg where a significant number or share of residents are living more than one mile from

the nearest grocery store; and

WHEREAS, the USDA has also identified census tracts in St. Petersburg where more than

100 households have no access to a vehicle and are living more than ½ mile from the nearest

grocery store; and

WHEREAS, the availability of nutritious food for all St. Petersburg citizens is essential to

the health and well-being of the community, and

WHEREAS, on July 30, 2020, the City Council Health, Energy, Resiliency &

Sustainability Committee heard a presentation by Julie Rocco, Senior Community Engagement

Advocate with the Foundation for a Healthy St. Petersburg (the “Foundation”) regarding food

insecurity in St. Petersburg and the Foundation’s efforts to coordinate the establishment of an

independent St. Petersburg Food Policy Council (the “Food Policy Council”), to examine how the

local food system operates and provide policy recommendations to improve that system; and

WHEREAS, the primary goals of the Food Policy Council include: connecting economic

development, food insecurity efforts, preservation and enhancement of agriculture and

environmental concerns; supporting the development and expansion of locally produced foods;

reviewing proposed legislation and regulations that affect the food system; making

recommendations to government bodies; and gathering, synthesizing and sharing informing on

community food systems; and

WHEREAS, the Food Policy Council will be an autonomous body composed of diverse

stakeholders representing the various components, influencers and consumers of an equitable

community-based food system; and

WHEREAS, the City Council desires to express support for the establishment of the Food

Policy Council.

NOW THEREFORE, BE IT RESOLVED by the City Council of the City of St. Petersburg

that the City Council supports the establishment of an independent St. Petersburg Food Policy

Council (“Food Policy Council”) by the Foundation for a Healthy St. Petersburg.

This resolution shall become effective immediately upon its adoption.

Approved by:

_____________________

City Attorney (designee)

00525033

74

The following page(s) contain the backup material for Agenda Item: Authorizing the Mayor or his

designee to accept a grant from the U.S. Department of Housing and Urban Development (“HUD”)

in the amount of $2,902,139 for the Emergency Solutions Grant Coronavirus (“ESG-CV-2”) funding

to prevent, prepare for and respond to the Coronavirus (COVID-19) pandemic which addresses the

unique needs of low- and moderate income individuals; approving a substantial amendment to the

FY 2019/20 Annual Action Plan (“Amendment”) in the amount of $2,902,139 to add projects to

fund with ESG-CV-2 and to expedite the use of these resources to address the COVID-19 crisis;

approving a supplemental appropriation in the amount of $2,902,139 from the increase in the

unappropriated balance of the Emergency Solutions Grant Fund (1112), resulting from additional

revenue to be received during FY 2019/20, to the Housing and Community Development

Department, Administration Division (082-1089); authorizing the Mayor or his designee to submit

the substantial amendment of the FY 2019/20 Annual Action Plan to the U.S. Department of

Housing and Urban Development (“HUD”); to execute all documents necessary to effectuate these

transactions.

Please scroll down to view the backup material.

I-1

I-1

Page 1 of 3

ST. PETERSBURG CITY COUNCIL

(Non-Consent Agenda Item)

Meeting of September 3, 2020

TO: The Honorable Ed Montanari, Chair, and Members of City Council

SUBJECT: A resolution authorizing the Mayor or his designee to accept a grant from the U.S.

Department of Housing and Urban Development (“HUD”) in the amount of $2,902,139 for the

Emergency Solutions Grant Coronavirus (“ESG-CV-2”) funding to prevent, prepare for and respond

to the Coronavirus (COVID-19) pandemic which addresses the unique needs of low- and moderate-

income individuals; approving a substantial amendment to the FY 2019/20 Annual Action Plan

(“Amendment”) in the amount of $2,902,139 to add projects to fund with ESG-CV-2 and to expedite

the use of these resources to address the COVID-19 crisis; approving a supplemental appropriation in

the amount of $2,902,139 from the increase in the unappropriated balance of the Emergency Solutions

Grant Fund (1112), resulting from additional revenue to be received during FY 2019/20, to the

Housing and Community Development Department, Administration Division (082-1089); authorizing

the Mayor or his designee to submit the substantial amendment of the FY 2019/20 Annual Action Plan

to the U.S. Department of Housing and Urban Development (“HUD”); to execute all documents

necessary to effectuate these transactions; and providing an effective date.

EXPLANATION: During March 2020, Congress and the President approved the Coronavirus Aid,

Relief, and Economic Security Act (“CARES Act”), Public Law 116-136, which has the purpose of

providing emergency assistance and health care response for individuals, families and businesses

affected by the 2020 coronavirus pandemic. Funding was approved to ensure that

individuals/households who have lost their jobs, had to close their businesses, or who could not pay

their rents/mortgages were provided resources to assist them while waiting for the pandemic to

subside.

The CARES Act made available an additional $4 billion in Emergency Solutions Grant Coronavirus

(“ESG-CV”) funds to supplement the FY 2020 ESG funding provided under the Further Consolidated

Appropriations Act, 2020 (Public Law 116-94) to the U.S. Department of Housing and Urban

Development (“HUD”) in which HUD immediately allocated $1 billion to entitlement recipients

based on the FY 2020 ESG formula. On April 2, 2020, the City of St. Petersburg (“City”) was

awarded $539,562 in ESG-CV-1 grant funding and on May 21, 2020 accepted and appropriated this

grant by Resolution #2020-197.

On June 9, 2020, HUD advised the City that an additional $2.96 billion in funding for ESG-CV grants

was being allocated by a separate formula developed by the Secretary of HUD. The variables used

in this calculation were: 1) total homeless population, 2) unsheltered homeless population, 3) total

very-low income renters, and 4) very-low income renters that are overcrowded or without a kitchen

or plumbing. Based on this formula, the City of St. Petersburg (“City”) was awarded $2,902,139 in

ESG-CV-2 grant funding.

In order to accelerate the ability to assist those most in need, a substantial amendment to the FY

2019/20 Annual Action Plan (“Amendment”), which was originally approved under Resolution

Number 2019-393 dated August 1, 2019, is needed to add projects for the ESG-CV-2 funding totaling

$2,902,139.

Page 2 of 3

A Notice of Funding Availability (“NOFA”) was placed in the Tampa Bay Times on July 8, 2020

that described the activities for the grant funding totaling $2,902,139 as follows:

• $104,499 for City administrative costs

• $1,185,714 for rental/utility assistance

• $1,611,926 for to prevent, prepare for and respond to COVID-19 crisis

Proposals were requested from not-for-profit agencies for allowable activities to address the funding

totaling $1,611,926 with the deadline for submission occurring on July 31, 2020. Five applications

were received and have been reviewed for eligibility and responding to the impact of the COVID-19

crisis.

Administration has determined that all requests meet the need for funding from the $1,611,926

available to prevent, prepare for and respond to COVID-19 and is recommending funding to the

following:

• Community Action Stops Abuse (CASA) – $25,627 – increase in food/consumable supplies,

childcare and security;

• Catholic Charities – $250,000 – rapidly re-house the homeless and housing stability case

management;

• Directions for Living – $600,000 – rapidly re-house the homeless and housing stability case

management; and

• St. Vincent dePaul – $257,416 – provide temporarily hotel/motel vouchers where shelter beds

are not available prioritizing persons who are at greater risk of COVID-19 including persons

60 years of age and older with underlying health conditions and

• St Vincent dePaul – $478,883 – rapidly re-house the homeless and housing stability case

management.

From the initial $1,185,714 shown as available funding in the NOFA for rental/utility assistance,

Administration is supporting that $1,000,000 be utilized for direct rental/utility assistance and $185,714

for program delivery fees to be awarded to Boley Centers and Catholic Charities as ongoing funding to

continue to provide assistance on behalf of the City.

A public notice was published on August 26, 2020, in the Tampa Bay Times to notify the public of the

proposed Amendment and of the public hearing to be held on September 3, 2020, which complies with

the revised Citizen Participation Plan requirements of the Consolidated Plan.

Administration is requesting a supplemental appropriation of $2,902,139 in ESG-CV-2 funding from

the increase in the unappropriated balance of the Emergency Solutions Grant Fund (1112) resulting

from the grant to fund the programs.

Page 3 of 3

RECOMMENDATION: A resolution authorizing the Mayor or his designee to accept the grant from

the U.S. Department of Housing and Urban Development (“HUD”) in the amount of $2,902,139 for

the Emergency Solutions Grant Coronavirus (“ESG-CV”) funding to prevent, prepare for and respond

to the Coronavirus (COVID-19) pandemic which addresses the unique needs of low- and moderate-

income individuals; approving a substantial amendment to the FY 2019/20 Annual Action Plan

(“Amendment”) in the amount of $2,902,139 to add projects to fund with Emergency Solutions Grant

Coronavirus (“ESG-CV”) and to expedite the use of these resources to address the COVID-19 crisis;

approving a supplemental appropriation in the amount of $2,902,139 from the increase in the

unappropriated balance of the Emergency Solutions Grant Fund (1112), resulting from additional

revenue to be received during FY 2019/20, to the Housing and Community Development Department,

Administration Division (082-1089); authorizing the Mayor or his designee to submit the substantial

amendment to the FY 2019/20 Annual Action Plan to the U.S. Department of Housing and Urban

Development (“HUD”); execute all documents necessary to effectuate these transactions; and

providing an effective date.

COST/FUNDING/ASSESSMENT INFORMATION:

Revenues of $2,902,139 will be received from the U.S. Department of Housing and Urban

Development (“HUD). Funds will be available after the approval of a supplemental appropriation in

the amount of $2,902,139 from the increase in the unappropriated balance of the Emergency Solutions

Grant Fund (1112), resulting from these additional revenues, to the Housing and Community

Development Department, Administration Division (082-1089).

Attachment: Resolution

APPROVALS:

Administration: __________________________ Budget:__________________________

Legal: 00523281.doc v1

Robert Gerdes

Page 1 of 3

Resolution No. 2020 -_______

A RESOLUTION AUTHORIZING THE MAYOR OR HIS DESIGNEE TO ACCEPT A GRANT FROM THE U.S. DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT (“HUD”) IN THE AMOUNT OF $2,902,139 FOR THE EMERGENCY SOLUTIONS GRANT CORONAVIRUS (“ESG-CV-2”) FUNDING TO PREVENT, PREPARE FOR AND RESPOND TO THE CORONAVIRUS (COVID-19) PANDEMIC WHICH ADDRESSES THE UNIQUE NEEDS OF LOW- AND MODERATE-INCOME INDIVIDUALS; APPROVING A SUBSTANTIAL AMENDMENT TO THE FY 2019/20 ANNUAL ACTION PLAN (“AMENDMENT”) IN THE AMOUNT OF $2,902,139 TO ADD PROJECTS TO FUND WITH ESG-CV-2 AND EXPEDITE THE USE OF THESE RESOURCES TO ADDRESS THE COVID-19 CRISIS; APPROVING A SUPPLEMENTAL APPROPRIATION IN THE AMOUNT OF $2,902,139 FROM THE INCREASE IN THE UNAPPROPRIATED BALANCE OF THE EMERGENCY SOLUTIONS GRANT FUND (1112), RESULTING FROM ADDITIONAL REVENUE TO BE RECEIVED DURING FY 2019/20, TO THE HOUSING AND COMMUNITY DEVELOPMENT DEPARTMENT, ADMINISTRATION DIVISION (082-1089); AUTHORIZING THE MAYOR OR HIS DESIGNEE TO SUBMIT THE SUBSTANTIAL AMENDMENT TO THE FY 2019/20 ANNUAL ACTION PLAN TO HUD; TO EXECUTE ALL DOCUMENTS NECESSARY TO EFFECTUATE THESE TRANSACTIONS; AND PROVIDING AN EFFECTIVE DATE.

WHEREAS, during March 2020, Congress and the President approved the Coronavirus Aid, Relief, and Economic Security Act (“CARES Act”), Public Law 116-136, which has the purpose of providing emergency assistance and health care response for individuals, families and businesses affected by the coronavirus pandemic, and

WHEREAS, the CARES Act made available an additional $4 billion in Emergency Solutions Grant Coronavirus (“ESG-CV”) funds to supplement the FY 2020 ESG funding provided under the Further Consolidated Appropriations Act, 2020 (Public Law 116-94) to the U.S. Department of Housing and Urban Development (“HUD”) in which HUD immediately allocated $1 billion to entitlement recipients based on the FY 2020 ESG formula; and

WHEREAS, on April 2, 2020, the City of St. Petersburg (“City”) was awarded $539,562

in ESG-CV-1 grant funding and on May 21, 2020 City Council accepted and appropriated this grant by Resolution #2020-197; and

WHEREAS, on June 9, 2020, HUD advised the City that an additional $2.96 billion in

funding for ESG-CV-2 grants was being allocated by a separate formula developed by the Secretary of HUD that included variables such as 1) total homeless population, 2) unsheltered homeless population, 3) total very-low income renters, and 4) very-low income renters that are

Page 2 of 3

overcrowded or without a kitchen or plumbing and, based on this formula, the City was awarded $2,902,139 in ESG-CV-2 grant funding; and

WHEREAS, in order to accelerate the ability to assist those most in need, a substantial

amendment of the FY 2019/20 Annual Action Plan (“Amendment”), which was originally approved under Resolution 2019-393 dated August 1, 2019, is needed to add projects for the ESG-CV funding totaling $2,902,139; and

WHEREAS, a Notice of Funding Availability (“NOFA”) was placed in the Tampa Bay Times on July 8, 2020 that described the activities for the grant funding totaling $2,902,139 as: 1) $104,499 for administrative costs, 2) $1,185,714 for rental/utility assistance, and 3) $1,611,926 to prevent, prepare for and respond to COVID-19 crisis; and

WHEREAS, proposals were requested from not-for-profit agencies for allowable activities

to address the funding totaling $1,611,926 with the deadline for submission occurring on July 31, 2020; whereby, five applications were received and have been reviewed for eligibility and responding to the impact of the COVID-19 crisis; and

WHEREAS, Administration has determined that all requests meet the need for funding from the $1,611,926 available to prevent, prepare for and respond to COVID-19 and is recommending funding to the following:

Community Action Stops Abuse (CASA) $25,627 – increase in food/consumable supplies, childcare and security;

Catholic Charities $250,000 – rapidly re-house the homeless and housing stability case management;

Directions for Living $600,000 – rapidly re-house the homeless and housing stability case management; and

St. Vincent dePaul $257,416 – provide temporarily hotel/motel vouchers where shelter beds are not available prioritizing persons who are at greater risk of COVID-19 including persons 60 years of age and older with underlying health conditions and

St Vincent dePaul $478,883 – rapidly re-house the homeless and housing stability case management; and

WHEREAS, from the initial $1,185,714 shown as available funding in the NOFA for rental/utility assistance, Administration is supporting that $1,000,000 be utilized for direct rental/utility assistance and $185,714 for program delivery fees to be awarded to Boley Centers and Catholic Charities to continue to provide assistance on behalf of the City; and

WHEREAS, a public notice was published on August 26, 2020, in the Tampa Bay Times

to notify the public of the proposed Amendment and of the public hearing to be held on September 3, 2020, which complies with the revised Citizen Participation Plan requirements of the Consolidated Plan; and

WHEREAS, Administration is requesting a supplemental appropriation of $2,902,139 in

ESG-CV-2 funding from the increase in the unappropriated balance of the Emergency Solutions Grant Fund (1112) resulting from the grant to fund the programs.

Page 3 of 3

NOW THEREFORE, BE IT RESOLVED by the City Council of the City of St. Petersburg,

Florida, that there is hereby approved that the Mayor or his designee is authorized to accept the grant from the U.S. Department of Housing and Urban Development (“HUD”) in the amount of $2,902,139 for the Emergency Solutions Grant Coronavirus (“ESG-CV-2”) funding to prevent, prepare for and respond to the Coronavirus (COVID-19) pandemic which addresses the unique needs of low- and moderate-income individuals.

BE IT FURTHER RESOLVED that there is hereby approved the following substantial

amendment to the FY 2019/20 Annual Action Plan (“Amendment”) in the amount of $2,902,139 to add projects to fund with ESG-CV-2 and expedite use of these resources to address the COVID-19 crisis.

BE IT FURTHER RESOLVED that there is hereby approved the following supplemental

appropriation from the increase in the unappropriated balance of the Emergency Solutions Grant Fund (1112), resulting from additional revenue to be received during FY 2019/20, for FY20:

Emergency Solutions Grant Fund (1112) Housing and Community Development Department, Administration Division (082-1089) $2,902,139 BE IT FURTHER RESOLVED that the Mayor or his designee is authorized to submit the

substantial amendment to the FY 2019/20 Annual Action Plan to HUD. BE IT FURTHER RESOLVED that the Mayor or his designee is authorized to execute all

documents necessary to effectuate these transactions. This resolution shall become effective immediately upon its adoption.

Approvals: Legal: /s/Bradley Tennant________ Administration: Budget: _____________________________ Legal: 00523280.doc v1

Robert Gerdes

82

The following page(s) contain the backup material for Agenda Item: FY21 Utility Rates

Please scroll down to view the backup material.

I-2

I-2

MEMORANDUM City of St. Petersburg

TO: Honorable Ed Montanari, Chair and Members of City Council

FROM: Rick Kriseman, Mayor

DATE: August 21, 2020

RE: Utility Rates for FY2021 (Public Hearing)

_________________________________________________________________________________

Throughout FY20, the City has continued to address the unanticipated needs of the global pandemic Covid-

19 with the dedication and prioritization of residents and customers during all business making decisions. It is through this lens, that various scenarios have been evaluated and reevaluated for the FY21 Utility Rate

Study with the assurance that operational and capital requirements continue to be met and the financial

impact to customers are also being considered. Therefore, while the proposal today includes rate increases,

these increases are lower than what was originally anticipated at the beginning of FY20. Because of the

current and unknown future state of the economy, I believe this proposal will provide for less of a burden on our customers, while also ensuring that our Utility Programs are supported through a continued healthy

forecast in the future to come. In addition, today’s presentation includes a 40/60 cash to debt funding

proposal for the Water Resources Rate Program. This adjustment is a change from the 50/50 cash to debt

funding plan adopted during the 2018 Rate Study. This split will still allow for significant interest expense

savings across the forecasted CIP Bond Program but will provide for less of a burden to be placed on our

customers within our current economic condition.

Today’s rate proposal continues to support future capital project needs in each of the enterprise operations.

Sanitation anticipates increased capital needs for replacement of an aging fleet and facilities. In addition,

the proposal continues to move Sanitation forward on a normal vehicle replacement cycle once the aged

fleet is fully replaced. The Water Resources Capital Improvement Plan also continues to include significant capital enhancements to the systems’ assets including projects associated with the Consent Order executed

on July 26, 2017. Lastly, the Stormwater Utility is projecting capital project needs coming out of the in-

progress Stormwater Master Plan.

The attached memo provides detailed information for the proposed rates in each of the enterprise operations. A 2.25% increase is proposed for water, a 7.25% increase is proposed for wastewater, and no increase (zero

percent) is proposed for reclaimed water. In addition, a 10.07% increase is proposed for stormwater and a

3.00% increase is proposed for Sanitation. This report was reviewed by the Budget, Finance & Taxation

Committee on June 11, 2020, as well as at the First Reading on August 20, 2020. Today, we recommend

final adoption of utility rates to be effective October 1, 2020. There are three separate Ordinances requiring

action.

Memo to Mayor Kriseman

August 20, 2020

Page 1

MEMORANDUM TO: Mayor Rick Kriseman FROM: Robert Gerdes, Neighborhood Affairs Administrator Claude D. Tankersley, P.E., Public Works Administrator DATE: September 3, 2020 SUBJECT: FY 2021 Utility Rate Study Program (Water Resources, Stormwater, and Sanitation Utility Programs) Executive Summary The financial rate team of Stantec Consulting Services, Inc., along with City staff, have conducted a revenue sufficiency analysis and cost of service rate study for the City of St. Petersburg’s Water, Wastewater, Reclaimed Water, Stormwater, and Sanitation Utility Systems. These programs are enterprise funds which are supported through customer utility billing revenues. Customers are charged monthly for services and all utility fees are consolidated into one bill. Table 1 below represents the fees located on a customer’s utility bill, along with the proposed rate changes to be presented to City Council for FY21. Table 1

FY21 Proposed Utility Rates (Customer Utility Bill Fees & Charges)

Services

FY 2020 Proposed FY 2021

Amount Change

Percent Change Applied

Potable Water – Fixed Rate 5/8” Meter Base Rate

$12.89 $13.18 $0.29 2.25%

Potable Water – Variable Rate Rate per 1,000 Gallons-up to 5,600 Gallons Includes Tampa Bay Water Charge

$4.66

$4.76 $0.10 2.25%

Sewer – Fixed Rate 5/8” Meter Base Rate

$19.44 $20.85 $1.41 7.25%

Sewer – Variable Rate Rate per 1,000 Gallons

$7.46 $8.00 $0.54 7.25%

Reclaimed Water – Fixed Rate $31.39 $31.39 $0.00 0.00%

Sanitation – Collection/Disposal + Recycling $27.99 $28.83 $0.84 3.00%

Stormwater Fixed Rate Fee – Tier 1 $4.99 $5.49 $0.50 10.07%

10.07% Stormwater Fixed Rate Fee – Tier 2 $9.93 $10.93 $1.00 10.07%

Stormwater Fixed Rate Fee – Tier 3 $15.59 $17.16 $1.57 10.07%

Stormwater Fixed Rate Fee – Tier 4 $23.27 $25.61 $2.34 10.07%

RG

Memo to Mayor Kriseman

August 20, 2020

Page 2

With the emergence of the Covid-19 Global Pandemic, administration has reviewed various scenarios that will continue to balance the capital and operational needs of each utility across a ten-year forecast, all while taking into consideration the impact that increased rates might have on individual utility customers. Therefore, all three utility programs are recommending proposed increases that are lower than anticipated from last year’s study for FY21. Last year at this time, it was anticipated for FY21 that water service would increase by 3.50%, wastewater service by 8.50%, and reclaimed water service by 6.55%. As noted in Table 1, the proposed rate adjustments include increase of 2.25% for water; 7.25% for wastewater; and 0.00% for reclaimed water. In addition, sanitation services were anticipated to increase by 5.25% and stormwater services were anticipated to increase by 15.11%. Proposed FY21 rate adjustments include a 3% increase for Sanitation and a 10.07% increase for Stormwater. Proposed FY21 rate adjustments also include a decrease of 1.59% for wholesale water rates, an increase of 11.84% for wholesale wastewater rates, and an average annual increase of 1.23% for wholesale wastewater rates charged to the City of St. Pete Beach. Upon approval, proposed rates will impact a customer’s utility bill differently based on various factors. This includes water/wastewater consumption, utilization of the reclaimed water system, and determination of a customer’s stormwater tier. The single-family residential stormwater tier rates were approved by City Council for implementation in FY20 and separated single-family residential customers into one of four tiers. These tiers were developed based upon the amount of impervious surface area on a customer’s property. While the proposed rates include changes to the level of the stormwater fees for each tier, there are no proposed changes to the tiers or ranges of impervious area. Tables 2-5 below represents a typical customer’s utility bill, by tier, for a single-family resident with the FY21 Proposed Utility Rates included. Scenarios also include 4,000 gallons per month of water and wastewater use, utilization of sanitation and recycling services, and two different total bill amounts, which include or exclude reclaimed water services. Table 2

TYPICAL CUSTOMER MONTHLY UTILITY BILL - Stormwater Tier 1

1 - 1,600 sq.ft impervious surface area, 4,000 Gallons Water & Wastewater Use, Reclaimed, Sanitation, and Recycling Services

Services FY 2020 Proposed

FY2021 Amount Change

Sanitation (including Recycling) $27.99 $28.83 $0.84

Potable Water $31.53 $32.22 $0.69

Wastewater $49.28 $52.85 $3.57

Stormwater (Tier 1-15% of parcels) $4.99 $5.49 $0.50

Reclaimed Water $31.39 $31.39 $0.00

TOTAL (including Reclaimed Water) $145.18 $150.78 $5.60

(12% of Customers)

TOTAL (excluding Reclaimed Water) $113.79 $119.39 $5.60

Memo to Mayor Kriseman

August 20, 2020

Page 3

Table 3 TYPICAL CUSTOMER MONTHLY UTILITY BILL - Stormwater Tier 2

1,601-3,200 sq.ft impervious surface area, 4,000 Gallons Water & Wastewater Use, Reclaimed, Sanitation, and Recycling Services

Services FY 2020 Proposed

FY2021 Amount Change

Sanitation (including Recycling) $27.99 $28.83 $0.84

Potable Water $31.53 $32.22 $0.69

Wastewater $49.28 $52.85 $3.57

Stormwater (Tier 2 – 51% of parcels) $9.93 $10.93 $1.00

Reclaimed Water $31.39 $31.39 $0.00

TOTAL (including Reclaimed Water) $150.12 $156.22 $6.10

(12% of Customers)

TOTAL (excluding Reclaimed Water) $118.73 $124.83 $6.10

Table 4

TYPICAL CUSTOMER MONTHLY UTILITY BILL - Stormwater Tier 3

3,201-4,800 sq.ft impervious surface area, 4,000 Gallons Water & Wastewater Use, Reclaimed, Sanitation, and Recycling Services

Services FY 2020 Proposed

FY2021 Amount Change

Sanitation (including Recycling) $27.99 $28.83 $0.84

Potable Water $31.53 $32.22 $0.69

Wastewater $49.28 $52.85 $3.57

Stormwater (Tier 3 – 24% of parcels) $15.59 $17.16 $1.57

Reclaimed Water $31.39 $31.39 $0.00

TOTAL (including Reclaimed Water) $155.78 $162.45 $6.67

(12% of Customers)

TOTAL (excluding Reclaimed Water) $124.39 $131.06 $6.67

Table 5

TYPICAL CUSTOMER MONTHLY UTILITY BILL - Stormwater Tier 4

4,801+ sq.ft impervious surface area, 4,000 Gallons Water & Wastewater Use, Reclaimed, Sanitation, and Recycling Services

Services FY 2020 Proposed

FY2021 Amount Change

Sanitation (including Recycling) $27.99 $28.83 $0.84

Potable Water $31.53 $32.22 $0.69

Wastewater $49.28 $52.85 $3.57

Stormwater (Tier 4 – 10% of parcels) $23.27 $25.61 $2.34

Reclaimed Water $31.39 $31.39 $0.00

TOTAL (including Reclaimed Water) $163.46 170.90 $7.44

(12% of Customers)

TOTAL (excluding Reclaimed Water) $132.07 $139.51 $7.44

Memo to Mayor Kriseman

August 20, 2020

Page 4

It is important to note that although all utility services are consolidated into one utility bill, each enterprise is reviewed and presented to City Council individually. The Capital Improvement Program and Operating Budgets were presented to City Council on April 23, 2020 and May 5, 2020 at the Committee of the Whole Budget Workshops. A high-level summary of major impacts that affected the FY21 proposed rates for each enterprise is as follows: Projected FY21 Water Resources System Requirements The rate analysis includes projected expense requirements for the FY21 Water Resources Operating Fund projected at $163.1 million in FY21. This is a decrease of (.50%) over the FY20 Adopted Operating Budget. Although a small decrease in the overall Operating Fund is recommended, the Water Resources Operating Fund will still support a $41.2 million transfer in operating funds to the Water Resources Debt Funds, as well as a $8.6 million transfer to the Water Resources Capital Fund for essential capital improvement projects. In previous years, the bond rating agencies expressed concern that cash funded capital was low while debt continued to be issued. It was decided during the FY18 Rate Study that the transfer to capital increase would be accelerated to reach a 50/50 funding balance by FY22. Due to the emergence of the Covid-19 Global Pandemic, administration is proposing a delay in the continued progression of a 50/50 cash to debt funding plan and recommends maintaining a 40/60 plan for the remainder of the 10-year forecast. By meeting the 40/60 cash to debt funding in FY21, the City will have saved $495 million in interest savings over the life of the debt and will provide a reduced level of rate increases to the customer across the 10-year forecast. The FY21-25 Water Resources Capital Improvement Plan includes significant capital enhancements to the systems’ assets including projects associated with the Consent Order executed on July 26, 2017. Highlights of the plan include continued improvements to the water reclamation facilities, as well as $9 million in funding per year in the City’s Citywide Infrastructure Capital Improvement Fund (Penny Funding) for the Sanitary Sewer Inflow and Infiltration Removal Project. $18.95 million for collection system improvements is budgeted through FY23 (structural repair and inflow and infiltration) and $16.95 thereafter. Below is a summary of the 5-year Capital Improvement Plan. Table 6

Water Resources 5-Year CIP Plan (000’s omitted)

FY21 FY22 FY23 FY24 FY25 Total

Cosme & Pump Stations 490 7,150 15,500 8,900 3,450 35,490

Water Distribution Maint. 12,950 13,100 13,850 13,950 14,150 68,000

Wastewater Collection Maint 19,925 19,625 19,225 17,600 17,650 94,025

Lift Stations 8,775 3,835 6,885 4,545 8,045 32,085

Water Reclamation Facilities 10,810 16,090 30,170 23,810 34,085 114,965

Reclaimed System Improvements 1,760 3,525 3,600 14,725 10,350 33,960

Other 6,850 7,200 1,350 8,425 500 24,325

TOTAL $61,560 70,525 90,580 91,955 88,230 402,850

Memo to Mayor Kriseman

August 20, 2020

Page 5

The proposed rate increase for FY21 is mitigated using the Water Cost Stabilization Fund to meet the Target Fund Balance for three (3) months of operating expenses associated with water, wastewater, and reclaimed water. Two (2) months of the Target Fund Balance are proposed to be met by a portion of the Water Cost Stabilization Fund reserve while one (1) month will be met by the Operating Fund reserve. The target fund balance excludes the transfer to capital share of expenses. Reclaimed Water Reclaimed water rates recover approximately 80% of system costs, with the remaining balance recovered via water and wastewater retail rates. To maintain approximately 80% cost recovery rate for reclaimed water customers, there will be no change to the reclaimed water rate for FY21. The current FY21 capital improvement plan does include enhancements to the Water Resources Reclaimed System in the amount of $1.76 million. Stormwater The FY21 proposed Stormwater fee increase is 10.07% and supports a proposed operating budget in the amount of $22.66 million and a five-year CIP Program in the amount of $80.79 million. Increased expenditures include anticipated requirements for the Stormwater Operating budget, as well as continued planning for the Stormwater Master Plan which is projected to be completed in FY23. The Stormwater Utility will continue to review levels of service across FY20 and FY21 which will have an impact on programmatic future outcomes. The Stormwater Utility also aligns the CIP Program planning with the bond rating agency recommendations for an accelerated 50/50 cash to borrow funding plan. In FY21, the current CIP Program is proposed to receive a $1.67 million transfer from the Operating budget and is anticipated to reach the 50/50 cash to borrow funding plan by FY30. Sanitation The 3.00% proposed increase in Sanitation service rates will bring operational revenues in line with rising operational expenses. The rate proposal also includes a baseline provision for replacement of Sanitation facilities, a catch-up funding replacement cycle for dated fleet vehicles, and establishes a fully funded normal replacement cycle for service vehicles on a fiscal basis through FY30. The proposed rate also assumes a 6.00% year-over-year increase in Pinellas County tipping fees and the increase to process fees for the citywide collected recycling content under the current contract. Recommended Action Attached are three rate ordinances. The first reflects the proposed base and variable rate changes for water, wastewater and reclaimed water. The second ordinance reflects the changes to the stormwater utility rate structure fees. The third ordinance reflects the proposed rate change for Sanitation. Deposits, Connection Fees, and Fire Service Fees are proposed to remain the same in FY21 with the potential to update during a future year’s rate study.

Memo to Mayor Kriseman

August 20, 2020

Page 6

City Council conducted a first reading of the proposed rate ordinance on August 20, 2020 and today is the Public Hearing for the proposed rates for final adoption. This will allow the rates to be effective as of October 1, 2020 as included within the FY21 revenue projections. Attachment 1: Customer Notification Attachment 2: Variable Rates including TBW pass-thru Attachment 3: Recommended Base Rates Attachment 4: Irrigation Only Rates Attachment 5: Wholesale Rates Attachment 6: History of Rate Increases Attachment 7: Chapter 27 Draft Rate Ordinances

Attachment 1

Attachment 2

RECOMMENDED VARIABLE RATES

WATER BLOCK RATES

(Single-Family Residential and Multifamily Residential: Per Dwelling Unit) Per 1,000 Gallons

FY20 TBW FY20 Total FY21 TBW FY21 Total

First 5,600 Gallons/month $2.26 $2.40 $4.66 $2.28 $2.48 $4.76

Next 2,400 Gallons/month $3.44 $2.40 $5.84 $3.49 $2.48 $5.97

Next 7,000 Gallons/month $5.55 $2.40 $7.95 $5.65 $2.48 $8.13

Next 5,000 Gallons/month $8.10 $2.40 $10.50 $8.26 $2.48 $10.74

Over 20,000 Gallons/month* $18.61 $2.40 $21.01 $19.00 $2.48 $21.48

(Commercial)

Per 1,000 Gallons

FY20 TBW FY20 Total FY21 TBW FY21 Total

Up to the Average $2.26 $2.40 $4.66 $2.28 $2.48 $4.76

Average to 1.4 Times Average $3.96 $2.40 $6.36 $4.02 $2.48 $6.50

1.4 to 1.8 Times Average $5.55 $2.40 $7.95 $5.65 $2.48 $8.13

Over 1.8 Times Average $6.96 $2.40 $9.36 $7.09 $2.48 $9.57

WASTEWATER VARIABLE RATE

(Per 1,000 Gallons)

FY19 FY20

WASTEWATER $7.46 $8.00

* Applies to Single-Family Residential Customers only

Attachment 3

RECOMMENDED BASE RATES

WATER BASE RATES

WASTEWATER BASE RATES

Meter Size FY20 FY21 DifferencePercent

Difference

5/8” $ 12.89 $ 13.18 $0.29 2.25%

1” $ 32.23 $ 32.95 $0.72 2.23%

1½” $ 64.45 $ 65.90 $1.45 2.25%

2” $ 103.12 $ 105.44 $2.32 2.25%

3” $ 206.24 $ 210.88 $4.64 2.25%

4” $ 322.25 $ 329.50 $7.25 2.25%

6” $ 644.50 $ 659.00 $14.50 2.25%

8” $ 1,031.20 $ 1,054.40 $23.20 2.25%

10” $ 1,482.35 $ 1,515.70 $33.35 2.25%

12” $ 2,771.35 $ 2,833.71 $62.36 2.25%

Meter Size FY20 FY21 DifferencePercent

Difference

5/8” $ 19.44 $ 20.85 $1.41 7.25%

1” $ 48.60 $ 52.12 $3.52 7.25%

1½” $ 97.20 $ 104.25 $7.05 7.25%

2” $ 155.52 $ 166.80 $11.28 7.25%

3” $ 311.04 $ 333.59 $22.55 7.25%

4” $ 486.00 $ 521.24 $35.24 7.25%

6” $ 972.00 $ 1,042.47 $70.47 7.25%

8” $ 1,555.20 $ 1,667.95 $112.75 7.25%

10” $ 2,235.60 $ 2,397.68 $162.08 7.25%

12” $ 4,179.60 $ 4,482.62 $303.02 7.25%

Attachment 4

IRRIGATION-ONLY RATES

Irrigation Only Base and Volume Charges

Volume Rates

Consumption Ranges (in Gallons) (per 1,000 Gallons)

Meter Size (inches)

Base Fee1

Tier 1

Tier 2

Tier 3 Tier 1 Tier 2 Tier 3

¾ $16.18 $5.25 $7.88 $18.63 0-15,000 15,001-20,000 >20,000

1 $35.95 $5.25 $7.88 $18.63 0-37,000 37,001-50,000 >50,000

1½ $68.90 $5.25 $7.88 $18.63 0-75,000 75,001-100,000

>100,000

2 $108.44 $5.25 $7.88 $18.63 0-120,000 120,001-160,000

>160,000

3 $213.88 $5.25 $7.88 $18.63 0-240,000 240,001-320,000

>320,000

4 $332.50 $5.25 $7.88 $18.63 0-375,000 375,001-500,000

>500,000

6 $662.00 $5.25 $7.88 $18.63 0-750,000 750,001-1,000,000

>1,000,000

8 $1,057.40 $5.25 $7.88 $18.63 0-

1,200,000 1,200,001-1,600,000

>1,600,000

10 $1,518.70 $5.25 $7.88 $18.63 0-

1,750,000 1,750,001-2,300,000

>2300000

12 $2,836.77 $5.25 $7.88 $18.63 0-

3,225,000 3,225,001-4,300,000

>4,300,000

Tampa Bay Water: $2.48 per 1,000 Gallons

Attachment 5

WHOLESALE RATES WHOLESALE WATER: Customer: City of Gulfport -1.59% decrease FY20: $5,341/million gallons FY21: $5,256/million gallons WHOLESALE WASTEWATER: Customers: Cities of: Gulfport, South Pasadena, Treasure Island Pinellas County: Ft. Desoto Pinellas County: Bear Creek Sanitary Sewer District Utilities Inc. of Florida: Tierra Verde 11.84% increase FY20: $4,196/million gallons FY21: $4,693/million gallons Customer: City of St. Pete Beach 1.23% increase FY20: $2,402/million gallons, $114,296/month for capital projects FY21: $2,757/million gallons, $89,886/month for capital projects

Attachment 6

HISTORY OF RATE INCREASES

SANITATION RATE

(FY 88-21)

Fiscal Years

From To Amount Change

Percent Change Applied

88-96 $18.20 $18.20 $0.00 0.00%

97-05 $18.20 $16.35 ($1.85) -10.16%

05-06 $16.35 $19.95 $3.60 22.02%

06-07 $19.95 $21.15 $1.20 6.02%

07-08 $21.15 $21.76 $0.61 2.88%

08-09 $21.76 $22.33 $0.57 2.62%

10-18 $22.33 $22.33 $0.00 0.00%

18-19 $22.33 $23.50 $1.17 5.25%

19-20 $23.50 $24.73 $1.23 5.23%

20-21 $24.73 $25.47 $0.74 3.00%

Total Increase/Average % $7.27 3.69%

Note: Rates above do not include the monthly recycling fee of $3.10 instituted in FY 2015 for the cost of the curbside recycling program. The FY 21 proposed rate increase yields a recycling fee of $3.36.

Attachment 6

HISTORY OF RATE INCREASES CONSUMPTION OF WATER AND SEWER

AT 4,000 GALLONS PER MONTH

(FY 00 – 21)

Fiscal Years

Amount Prior to Increase

Bill After Increase

Amount Change

Percent Change

99-00 $25.35 $27.01 $1.66 6.55%

00-01 $27.01 $28.42 $1.41 5.22%

01-02 $28.42 $30.75 $2.33 8.20%

02-03 $30.75 $34.37 $3.62 11.77%

03-04 $34.37 $37.58 $3.21 9.34%

04-05 $37.58 $39.25 $1.67 4.44%

05-06 $39.25 $40.19 $0.94 2.39%

06-07 $40.19 $41.27 $1.08 2.69%

07-08 $41.27 $42.72 $1.45 3.51%

08-09 $42.72 $44.03 $1.31 3.07%

09-10 $44.03 $44.90 $0.87 1.98%

10-11 $44.90 $48.25 $3.35 7.46%

11-12 $48.25 $50.53 $2.28 4.73%

12-13 $50.53 $51.89 $1.36 2.69%

13-14 $51.89 $53.83 $1.94 3.74%

14-15 $53.83 $56.37 $2.54 4.72%

15-16 $56.37 $58.46 $2.09 3.71%

16-17 $58.46 $61.55 $3.09 5.29%

17-18 $61.55 $71.58 $10.03 16.30%

18-19 $71.58 $76.16 $4.58 6.40%

19-20 $76.16 $80.81 $4.65 6.11%

20-21 $80.81 $85.07 $4.26 5.27%

Total Increase/Average % $59.72 5.71%

Attachment 6

HISTORY OF RATE INCREASES

STORMWATER RATE

(FY 91 – 21)

Fiscal Years Amount Prior to Increase

Bill After Increase

Amount Change

Percent Change

91-01 $4.50 $4.50 $0.00 0.00%

01-02 $4.50 $5.00 $0.50 11.12%

02-03 $5.00 $5.00 $0.00 0.00%

03-04 $5.00 $5.00 $0.00 0.00%

04-05 $5.00 $6.00 $1.00 20.00%

05-06 $6.00 $6.15 $0.15 2.50%

06-07 $6.15 $6.40 $0.25 4.07%

07-08 $6.40 $6.65 $0.25 3.91%

08-09 $6.65 $6.85 $0.20 3.01%

09-10 $6.85 $6.85 $0.00 0.00%

10-11 $6.85 $6.84 ($0.01) (0.15%)

11-12 $6.84 $6.84 $0.00 0.00%

12-13 $6.84 $6.84 $0.00 0.00%

13-14 $6.84 $6.84 $0.00 0.00%

14-15 $6.84 $6.84 $0.00 0.00%

15-16 $6.84 $6.84 $0.00 0.00%

16-17 $6.84 $9.00 $2.16 31.58%

17-18 $9.00 $10.00 $1.00 11.12%

18-19 $10.00 $11.00 $1.00 10.00%

19-20 (Proposed Tiers 1-

4)

Tier 1 $11.00 $4.99 ($6.01) ($54.64)

9.09% Tier 2 $11.00 $9.93 ($1.07) ($9.73)

Tier 3 $11.00 $15.59 $4.59 41.73%

Tier 4 $11.00 $23.27 $12.27 111.55%

Total Increase/Average % $16.28 5.33%

FY20 Preliminary Rates by Tier (Square feet of Impervious Surface)

Tier 1 Tier 2 Tier 3 Tier 4

<1,600 1,601 to 3,200 3,201 to 4,800 > 4,800

$4.99 $9.93 $15.59 $23.27

Amount

Prior to

Increase

Bill After

Increase

Amount

Change

$4.50 $4.50 $0.00

$4.50 $5.00 $0.50

$5.00 $5.00 $0.00

$5.00 $5.00 $0.00

$5.00 $6.00 $1.00

$6.00 $6.15 $0.15

$6.15 $6.40 $0.25

$6.40 $6.65 $0.25

$6.65 $6.85 $0.20

$6.85 $6.85 $0.00

$6.85 $6.84 ($0.01)

$6.84 $6.84 $0.00

$6.84 $6.84 $0.00

$6.84 $6.84 $0.00

$6.84 $6.84 $0.00

$6.84 $6.84 $0.00

$6.84 $9.00 $2.16

$9.00 $10.00 $1.00

$10.00 $11.00 $1.00

Tier 1 $11.00 $4.99 ($6.01) (54.64%)

Tier 2 $11.00 $9.93 ($1.07) (9.73%)

Tier 3 $11.00 $15.59 $4.59 41.73%

Tier 4 $11.00 $23.27 $12.27 111.55%

Tier 1 $4.99 $5.49 $0.50 10.07%

Tier 2 $9.93 $10.93 $1.00 10.07%

Tier 3 $15.59 $17.16 $1.57 10.07%

Tier 4 $23.27 $25.61 $2.34 10.07%

$0.99

$6.43

$12.66

$21.11

09-10

08-09

07-08

06-07

14-15

13-14

12-13

11-12

10-11

19-20

18-19

17-18

16-17

15-16

91-01

Fiscal Years

10.00%

11.12%

31.58%

0.00%

0.00%

0.00%

0.00%

0.00%

(0.15%)

05-06

04-05

03-04

02-03

01-02

0.00%

3.01%

3.91%

4.07%

2.50%

20.00%

0.00%

0.00%

11.12%

0.00%

20-21

(Proposed

Tiers 1-4)

10.07%

Applied Percent

Change

9.09%

Total Increase/Average %- - Tier 4 10.43%

Total Increase/Average %- - Tier 1 2.52%

Total Increase/Average %- - Tier 2 5.58%

Total Increase/Average %- - Tier 3 7.11%

1

ORDINANCE NO. _____

AN ORDINANCE RELATING TO UTILITY

RATES; AMENDING CHAPTER 27, SUBSECTION

405(b)(1) AND (2) OF THE ST. PETERSBURG

CITY CODE; AMENDING THE STORMWATER

UTILITY FEE; AMENDING THE TIERED RATE

STRUCTURE FEES FOR SINGLE FAMILY

RESIDENTIAL PARCELS; PROVIDING FOR

SEVERABILITY OF PROVISIONS; PROVIDING

AN EXPLANATION OF WORDS STRUCK

THROUGH AND UNDERLINED; ESTABLISHING

A DATE TO BEGIN CALCULATING NEW RATES

FOR BILLING PURPOSES; AND PROVIDING AN

EFFECTIVE DATE.

THE CITY OF ST. PETERSBURG DOES ORDAIN:

SECTION 1. Subsection 27-405 of the St. Petersburg City Code is hereby amended as

follows:

Sec. 27-405. Stormwater management system utility fee.

(b) Scheduled rates. The following uniform schedule of utility rates for services and facilities

of the stormwater system is hereby established:

(1) A monthly stormwater system utility fee of $910.93 per month is established as the

rate for each SFU.

(2) Each SFRP is grouped into the following categories for purposes of calculating

stormwater charges based upon their measured impervious area:

Tier Impervious Area Fee

Tier 1 Less than 1,600 square feet $4.99 5.49

Tier 2 1,601 square feet – 3,200 square feet $9.93 10.93

Tier 3 3,201 square feet – 4,800 square feet $15.59 17.16

Tier 4 More than 4,801 square feet $23.27 25.61

SECTION 2. That the unconstitutionality or invalidity of any word, sentence, or portion

of this ordinance shall not affect the validity of the remaining portions.

2

SECTION 3. That words in struck-through type are deletions from the existing St.

Petersburg City Code and words that are underlined are additions.

SECTION 4. That the rates established by this ordinance shall be utilized in calculating

customers’ bills beginning on October 1, 201920.

SECTION 5. In the event that this ordinance is not vetoed by the Mayor in accordance

with the City Charter, it shall become effective after the fifth business day after adoption unless

the Mayor notifies the City Council through written notice filed with the City Clerk that the Mayor

will not veto the ordinance, in which case the ordinance shall take effect immediately upon filing

such written notice with the City Clerk. In the event this ordinance is vetoed by the Mayor in

accordance with the City Charter, it shall not become effective unless and until the City Council

overrides the veto in accordance with the City Charter, in which case it shall become effective

immediately upon a successful vote to override the veto.

LEGAL: ADMINISTRATION:

Approved as to form and content:

_/s/ Jane Wallace__________________ ______________________________

City Attorney (designee)

Citylaw 00521783

1

ORDINANCE NO. _____

AN ORDINANCE RELATING TO UTILITY RATES

AND CHARGES; AMENDING CHAPTER 27,

SUBSECTIONS 27-141 (a), 27-142 (a), 27-144 (c),

27-146 (d), 27-283 (a), 27-284 (a), AND 27-284 (d)

OF THE ST. PETERSBURG CITY CODE;

AMENDING BASE AND VOLUME CHARGES

FOR WATER SERVICE; AMENDING

WHOLESALE WATER SERVICE CHARGES FOR

THE CITY OF GULFPORT; AMENDING BASE

AND VOLUME CHARGES FOR IRRIGATION

ONLY ACCOUNTS; AMENDING MONTHLY

CHARGES FOR COMMERCIAL WATER ONLY

ACCOUNTS; AMENDING BASE AND VOLUME

CHARGES FOR WASTEWATER SERVICE;

AMENDING WASTEWATER SERVICE

CHARGES FOR WHOLESALE CUSTOMERS;

PROVIDING FOR SEVERABILITY OF

PROVISIONS; PROVIDING AN EXPLANATION

OF WORDS STRUCK THROUGH AND

UNDERLINED; ESTABLISHING A DATE TO

BEGIN CALCULATING NEW RATES FOR

BILLING PURPOSES; AND PROVIDING AN

EFFECTIVE DATE.

THE CITY OF ST. PETERSBURG DOES ORDAIN:

SECTION 1. Subsection 27-141 (a) of the St. Petersburg City Code is hereby

amended as follows:

Sec. 27-141. - Established; amount; service categories defined; surcharge.

(a) Monthly use rate. City water customers will be charged monthly base and volume charges as

set forth in the following subsections:

(1) Base charges. The base charges, determined by meter size, are listed in the following

table:

Meter Size (in inches) Base Charge

⅝ or ¾ $12.89 $13.18

1 32.23 32.95

2

Meter Size (in inches) Base Charge

1½ 64.45 65.90

2 103.12 105.44

3 206.24 210.88

4 322.25 329.50

6 644.50 659.00

8 1,031.20 1,054.40

10 1,482.35 1,515.70

12 2,771.35 2,833.71

(2) Volume charges. Volume charges, determined by gallons used, are listed in the

following tables:

a. For single-family dwelling customers, $2.40 $2.48 for each 1,000 gallons

consumed as cost of water from Tampa Bay Water and an inverted rate as follows:

Volume Charges

Single-Family Dwelling Customer

Rates Per 1,000 Gallons

by Gallonage Increments

First 5,600 $2.26 $2.28

Next 2,400 3.44 3.49

Next 7,000 5.55 5.65

Next 5,000 8.10 8.26

Over 20,000 18.61 19.00

b. For multifamily dwelling customers, $2.40 $2.48 for each 1,000 gallons consumed

as cost of water from Tampa Bay Water and an inverted rate as follows:

Volume Charges

Multifamily Dwelling Customer

Rates Per 1,000 Gallons

Total Volume Divided by Number of Dwelling Units Served by Meter

First 5,600 per unit $2.26 $2.28

Next 2,400 per unit 3.44 3.49

3

Next 7,000 per unit 5.55 5.65

Over 15,000 per unit 8.10 8.26

c. For commercial customers, $2.40 2.48 for each 1,000 gallons consumed as cost of

water from Tampa Bay Water and an inverted rate as follows:

Volume Charges

Commercial Customer

Rates Per 1,000 Gallons

Gallonage Based on Monthly Average per Commercial Customer

Up to average $2.26 $2.28

Average to 1.4 times average 3.96 4.02

1.4 to 1.8 times average 5.55 5.65

Over 1.8 times average 6.96 7.09

A monthly average of a 12-month period will be calculated per commercial

customer for each fiscal year beginning October 1. The 12-month period utilized

will be October through September of the preceding fiscal year and will be updated

annually. For new commercial customers without consumption history, the lowest

block rate will be utilized until a 12-month period between October and September

is completed.

A commercial customer who experiences changed business conditions which

would necessitate a revised calculation of the monthly average, may request a

water use evaluation by the City. The City may calculate a new average based on

that evaluation. After receiving notice of the results of the evaluation, the customer

may appeal these results to the Utility Billing Review Committee within 14 days

by filing notice of appeal with the City Clerk.

SECTION 2. Subsection 27-142 (a) of the St. Petersburg City Code is hereby

amended to read as follows:

Sec. 27-142. - Wholesale water customers.

(a) Wholesale water service shall be provided to the City of Gulfport at a uniform volume

rate of $5,341.00 5,256.00 per million gallons effective October 1, 2019 2020. Charges

and surcharges shall be added to the uniform volume rate in accordance with the terms of

the City of Gulfport's wholesale water service agreement with the City of St. Petersburg,

including but not limited to a twenty-five percent (25%) outside the City surcharge.

4

SECTION 3. Subsection 27-144 (c) of the St. Petersburg City Code is hereby amended

to read as follows:

Sec. 27-144. Irrigation only accounts.

(c) Monthly irrigation only account charges.

Customers with an irrigation only account shall not be charged fees for wastewater services for

that account but shall pay a base charge based on the meter connection size, and also shall pay the

Tampa Bay Water volume charge and the tiered volume rate based on water consumption as

follows:

Irrigation Only Base and Volume Charges

Volume Rates

(per 1,000 Gallons) Consumption Ranges (in Gallons)

Meter

Size

(inches)

Base

Fee1 Tier 1

Tier

2 Tier 3 Tier 1 Tier 2 Tier 3

¾

$15.89

$16.18

$5.13

$5.25

$7.71

$7.88

$18.22

$18.63 0-15,000 15,001-20,000 >20,000

1

$35.23

$35.95

$5.13

$5.25

$7.71

$7.88

$18.22

$18.63 0-37,000 37,001-50,000 >50,000

$67.45

$68.90

$5.13

$5.25

$7.71

$7.88

$18.22

18.63 0-75,000 75,001-100,000 >100,000

2

$106.12

$108.44

$5.13

$5.25

$7.71

$7.88

$18.22

$18.63 0-120,000 120,001-160,000 >160,000

3

$209.24

$213.88

$5.13

$5.25

$7.71

$7.88

$18.22

$18.63 0-240,000 240,001-320,000 >320,000

4

$325.25

$332.50

$5.13

$5.25

$7.71

$7.88

$18.22

$18.63 0-375,000 375,001-500,000 >500,000

6

$647.50

$662.00

$5.13

$5.25

$7.71

$7.88

$18.22

$18.63 0-750,000 750,001-1,000,000 >1,000,000

8

$1,034.20

$1,057.40

$5.13

$5.25

$7.71

$7.88

$18.22

$18.63 0-1,200,000 1,200,001-1,600,000 >1,600,000

10

$1,485.35

$1,518.70

$5.13

$5.25

$7.71

$7.88

$18.22

$18.63 0-1,750,000 1,750,001-2,300,000 >2,300,000

5

12

$2,774.35

$2,836.77

$5.13

$5.25

$7.71

$7.88

$18.22

$18.63 0-3,225,000 3,225,001-4,300,000 >4,300,000

Tampa Bay Water: $2.40 $2.48 per 1,000 Gallons

SECTION 4. Subsection 27-146 (d) of the St. Petersburg City Code is hereby

amended to read as follows:

Sec. 27-146. Commercial water only account.

(d) Monthly charges. Commercial customers with a commercial water only account shall not be charged fees for

wastewater services for that account; however, the commercial customer shall pay a base charge based on

the meter connection size and volume charges based on water consumption as follows:

(1) Base charges. The base charges, determined by meter size, are listed in the

following table:

Meter Size (in inches) Base Charge

5/8 or ¾ $15.89 $16.18

1 35.23 35.95

1½ 67.45 68.90

2 106.12 108.44

3 209.24 213.88

4 325.25 332.50

6 647.50 662.00

8 1,034.20 1,057.40

10 1,485.35 1,518.70

12 2,774.35 2,836.71

(2) Volume charges. The volume charges shall be the same volume charges as set forth

in section 27-141(a)(2) for commercial customers.

SECTION 5. Subsection 27-283 (a) of the St. Petersburg City Code is hereby

amended to read as follows:

Sec. 27-283. - Wastewater service charge.

(a) Established, amount. There is hereby established and imposed upon the owners and/or

6

occupants of all premises which are connected to the sewer system a charge, to be designated

"wastewater service charge," which charge shall be based upon the amount of water used on the

premises except for that amount of water used for irrigation only accounts as established pursuant

to Section 27-144, as shown by the following schedule:

(1) A base charge per month based upon meter size in accordance with the following table:

Meter Size (inches) Base Charge

⅝ or ¾ $19.44 $20.85

1 48.60 52.12

1½ 97.20 104.25

2 155.52 166.80

3 311.04 333.59

4 486.00 521.24

6 972.00 1,042.47

8 1,555.20 1,667.95

10 2,235.60 2,397.68

12 4,179.60 4,482.62

(2) In addition to the base charge, there shall be a charge of $7.46 $8.00 for each 1,000

gallons of potable water registered on the water meter.

(3) Rates charged to customers outside the City in accordance with subsections (1) and (2)

of this section shall have added to the rate a surcharge of twenty-five percent (25%) of the

total wastewater charge.

(4) The base charge and any volume charge will apply on all active services; the base charge

will apply to all service in standby status; only when a service has been removed will the base

charge not be in effect.

SECTION 6. Subsections 27-284 (a) and 27-284 (d) of the St. Petersburg City

Code are hereby amended to read as follows:

Sec. 27-284. - Wholesale wastewater customers.

(a) Wholesale wastewater service shall be provided to the City of Gulfport; the City of South

Pasadena; Bear Creek Sanitary Sewer District, Pinellas County; Ft. Desoto, Pinellas County; the

7

City of Treasure Island; and Tierra Verde, Utilities Inc. of Florida at a uniform volume rate of

$4,196.00 $4,693.00 per million gallons for wholesale wastewater service effective October 1,

2019 2020, based upon metered wastewater flows.

(b) Wastewater service may be provided to other wholesale customers in accordance with

agreements as approved by City Council and at the same rates and surcharges as adopted in

subsection (a) of this section.

(c) Upon expiration of existing contracts, wholesale customers continuing to receive wastewater

service shall be charged those rates and surcharges as adopted in subsection (a) of this section.

Those customers located outside of the City limits shall also be charged an additional 25 percent

surcharge applied to the total wastewater charges billed.

(d) Wholesale wastewater service shall be provided to the City of St. Pete Beach at an estimated

rate including a uniform operation and maintenance volume rate of $2,402.00 $2,757.00 per

million gallons and a monthly capital charge of $114,296.00 $89,886 for wholesale wastewater

service effective October 1, 2019 2020. At the end of each fiscal year, actual rates for the fiscal

year will be determined in accordance with the terms of the agreement for wholesale wastewater

service between the City of St. Petersburg and the City of St. Pete Beach.

SECTION 7. That the unconstitutionality or invalidity of any word, sentence, or

portion of this ordinance shall not affect the validity of the remaining portions.

SECTION 8. That words in struck-through type are deletions from the existing St.

Petersburg City Code and words that are underlined are additions.

SECTION 9. That the rates and charges established by this ordinance shall be

utilized in calculating customers’ bills beginning on November 1, 2020 for water consumed during

the preceding month.

SECTION 10. In the event that this ordinance is not vetoed by the Mayor in

accordance with the City Charter, it shall become effective after the fifth business day after

adoption unless the Mayor notifies the City Council through written notice filed with the City

Clerk that the Mayor will not veto the ordinance, in which case the ordinance shall take effect

immediately upon filing such written notice with the City Clerk. In the event this ordinance is

vetoed by the Mayor in accordance with the City Charter, it shall not become effective unless and

until the City Council overrides the veto in accordance with the City Charter, in which case it shall

become effective immediately upon a successful vote to override the veto.

LEGAL: ADMINISTRATION:

/s/ Devon E. Haggitt ______________________________ City Attorney (designee)

119

The following page(s) contain the backup material for Agenda Item: Fiscal Year 2020 Tentative

Budget and Proposed Millage Rate

Please scroll down to view the backup material.

I-3

I-3

OFFICE OF THE MAYOR

CITY OF ST. PETERSBURG RICK KRISEMAN, MAYOR

_________________________________________________________________________________

MEMORANDUM City of St. Petersburg

TO: Honorable Ed Montanari, Chair, and Members of City Council

FROM: Rick Kriseman, Mayor

DATE: August 21, 2020

RE: First Reading of FY21 Tentative Budget Appropriations Ordinance and

Report of Changes from the Recommended Budget

Background: This report provides material for adoption of the tentative budget for FY21 and

contains material related to the Public Hearing scheduled for September 3, 2020 at 6:00 PM by

means of communications media technology via Zoom. At that hearing, staff will present the first

reading of the FY21 Budget/Appropriations Ordinance and certain material that is statutorily

required to comply with the “Truth in Millage” (TRIM) law. Final action on the FY21 budget is

scheduled to take place at the conclusion of the second Public Hearing scheduled for September

17, 2020 at 6:00 PM by means of communications media technology via Zoom.

Explanation: The Recommended Budget for FY21 was submitted to City Council on July 10,

2020. In accordance with statutory requirements, two public hearings have been scheduled

(September 3rd and September 17th) to receive public comment on the FY21 budget. In preparation

for the first Public Hearing, this report conveys the following material:

• Agenda for the September 3rd Public Hearing Attachment A

- providing statutory requirements

• Listing and description of all substantive Attachment B

changes made to both projected revenues

and anticipated expenditures for FY21 since

submission of the Recommended Budget on

July 10, 2020

• Resolution which adopts the proposed Attachment C

millage rate of 6.7550 mills

• Recommended Budget/Appropriations Attachment D

Ordinance

P.O. BOX 2842, ST. PETERSBURG, FLORIDA 33731 I TELEPHONE: (727) 893-7201 I FAX: (727) 892-5365 I STPETE.ORG

• Resolution which adopts the Recommended Attachment E

Budget/Appropriations Ordinance as the

tentative budget at the first Public Hearing

Adoption of Proposed Millage and Rolled Back Rate

The proposed aggregate millage rate adopted by City Council on July 16, 2020 was 6.7550 mills.

The Recommended FY21 Budget included that proposed millage rate of 6.7550 which represents

a 6.37% increase from the rolled back rate of 6.3502 mills. The rolled back rate is the rate that

will generate approximately the same amount of revenue as the prior year given the current

assessed property values (with exclusions provided by State Statute including new construction,

newly annexed properties, etc.). City policy provides that ad valorem revenue will be estimated

at 96% to allow for early payment discounts, uncollectibles, and value adjustment board revisions.

The proposed millage rate of 6.7550, which provides ad valorem revenue of $148.252 million,

along with the times and dates for the public hearings are advertised by the Pinellas County

Property Appraiser via TRIM notices mailed to all property owners. Revenues and expenditures

are detailed in the Recap of Changes (Attachment B). At this first public hearing, Council will

adopt the proposed millage rate, which cannot exceed the advertised millage rate of 6.7550 without

taxpayer notification by mail, at the city’s expense (s. 200.065(2)(d), F.S.). Council, can however,

reduce the millage rate from the 6.7550 provided in the TRIM notices without additional

notification or expense.

Council will also be asked to approve changes to the Recommended Budget which have occurred

subsequent to July 10, 2020 and approve the FY21 Tentative Budget which includes these changes.

State Statutes require a very specific format for the adoption process which is provided in the

Agenda shown in Attachment A.

General Information

Several important points may be helpful to Council members in reviewing the attached material.

First, the recommended ordinance sets appropriation levels for the General Fund, Special Revenue

Funds, Enterprise Funds, Debt Service Funds, and for transfers between funds. It appropriates all

Capital Project Funds for FY21, as provided for in the Recommended Capital Improvement

Program with any proposed adjustments. Additionally, the ordinance sets appropriations for

Dependent Special Districts and establishes authorization levels for each of the city’s Internal

Service Funds. For Internal Service Funds only the portion of funding provided from fund balance

or other external funding sources to partially offset operational cost (if any) is included in the

appropriation. The remaining portion of the Internal Service Funds does not require formal

appropriation inasmuch as they are funded through charges to those departments which use their

services. Setting an authorization level allows Council to establish a funding level for each internal

service operation while avoiding duplicate appropriations.

Subsequent to development of the Recommended Budget, staff has continued to monitor revenue

sources and evaluate both departmental budget requests and expenditure needs. As a result,

changes are proposed in many funds. A summary of all of the changes are shown on the attached

“Recap of Changes in the Recommended Budget for the Proposed Ordinance,” Attachment B.

P.O. BOX 2842, ST. PETERSBURG, FLORIDA 33731 I TELEPHONE: (727) 893-7201 I FAX: (727) 892-5365 I STPETE.ORG

Recommendation/Action Required

It is recommended that City Council adopt the proposed millage rate of 6.7550 according to F.S.

200.065 and then approve the Recommended FY21 Budget/Appropriations Ordinance on first

reading. It is further recommended that City Council approve the resolution adopting the

Recommended FY21 Budget Appropriations Ordinance (as modified by the changes presented in

Attachment B) as the tentative budget for the City of St. Petersburg for fiscal year ending

September 30, 2021. Final action on the FY21 budget will occur at the conclusion of the

September 17th Public Hearing.

00524084

ATTACHMENT A

FIRST PUBLIC HEARING ON THE FISCAL YEAR 2021 MILLAGE RATE AND BUDGET CITY OF ST. PETERSBURG, FLORIDA

Thursday, September 3, 2020

1. Call to Order; Opening of Public Hearing;Announcement of Purpose of Public Hearing.

2. First Reading of Budget/Appropriations OrdinanceTitle.

3. Introductory Remarks.

4. Presentation on the Tentative FY 2021 Budget and rolled-back rate.

5. Receipt of PublicComment.

6. Close Public Comment.

6:00 P.M.

AGENDA

Honorable Chair Ed Montanari

City Clerk

Mayor Rick Kriseman/Deputy Mayor Dr. Kanika Tomalin

Budget DirectorLiz Makofske

Honorable Chair Ed Montanari

Honorable Chair Ed Montanari

PUBLICLY ANNOUNCE: This is the start of the first public hearing on the Fiscal Year 2021 millage rate and budget. The purpose of this public hearing is to discuss the Mayor’s Recommended Budget, approve a Proposed Millage Rate, and approve the Recommended Budget/Appropriations Ordinance for Fiscal Year 2021 as the tentative budget for Fiscal Year 2021. Prior to public comment, the first substantive issue discussed shall be the percentage increase in millage over the rolled-back rate necessary to fund the budget, if any, and the specific purposes for which ad valorem tax revenues are being increased. That issue will be discussed by the Mayor and his staff after the title to the Budget/Appropriations Ordinance is read.

Read title of Budget/ Appropriations Ordinance.

General remarks.

Brief power point presentation. First substantive issue to be discussed is the percentage increase in millage over the rolled-back rate necessary to fund the budget, if any. The proposed millage is 6.7550. This rate represents an increase of 6.37% over the rolled-back rate of 6.3502. FS 200.065 (2)(e). The reasons for the increase should be discussed at this point.

PUBLICLY ANNOUNCE: This is the beginning of the public comment portion of the hearing. The general public shall be allowed to speak and ask questions prior to the adoption of the proposed millage rate and tentative budget by City Council.FS 200.065(2)(e).

PUBLICLY ANNOUNCE: The public comment portion of the hearing is now closed.

7. Council Comments,Discussion and Consideration of amendments to the Mayor’sRecommended Budget.

8. Re-compute proposedmillage rate if necessary.

9. Announcement of proposedmillage rate compared to the rolled-back rate.

10. Adopt millage resolution.

11. Adoption by Resolutionof the Recommended Budget/AppropriationsOrdinance as the Tentative Budget.

12. Announcement of Date, Time, and Place of finalpublic hearing.

13. Closing of first public hearing.

Mayor and Council

Budget Staff

Honorable Chair Ed Montanari

City Council

City Council

Honorable Chair Ed Montanari

Honorable Chair Ed Montanari

ATTACHMENT A If Council amends the Mayor’s Recommended Budget so that there will be a requirementfor there to be a change in the millagego to step 8, otherwise go to step 9.

Compute proposed millage rate and make changes to resolutions and Budget/Appropriations Ordinance as required. FS 200.065(2)(c)

PUBLICLY ANNOUNCE: The proposed millage rate for the City of St. Petersburg is 6.7550 mills which is an 6.37% increase over the rolled-back rate of 6.3502 mills.

Adopt resolution setting proposed millage rate. This must be done before adopting tentative budget and must have a separate vote. FS 200.065 (2)(d) & (e)

Adopt Mayor’s Recommended Budget (with any amendments that have been approved) as the tentative budget in two steps.

a) Motion to pass the Recommended Budget/Appropriations Ordinance (as amended if amended) for the City of St. Petersburg Fiscal Year ending September 30, 2021 on first reading.

b) Motion to approve resolution adopting the Recommended Budget/Appropriations Ordinance, as passed on first reading, as the tentative budget for the City of St. Petersburg Fiscal Year ending September 30, 2021.

PUBLICLY ANNOUNCE: The final public hearing on the Fiscal Year 2021 millage rate and budget shall be held virtually on September 17, 2020, 6:00 p.m. by means of communications media technology via Zoom. You may obtain meeting information by visiting www.stpete.org/budget, by emailing [email protected], or by calling 727-893-7448.

PUBLICLY ANNOUNCE: The first public hearing on the Fiscal Year 2021 millage rate and budget is now closed.

ATTACHMENT A

EXCERPTS FROM F.S. 200.065: Paragraph (2)(c): “Within 80 days of the certification of value pursuant to subsection (1), but not earlier than 65 days after certification, the governing body of each taxing authority shall hold a public hearing on the tentative budget and proposed millage rate. Prior to the conclusion of the hearing, the governingbody of the taxing authority shall amend the tentative budget as it sees fit, adopt the amended tentative budget, recompute its proposed millage rate, and publicly announce the percent, if any, by which the recomputed proposed millage rate exceedsthe rolled-back rate computed pursuant to subsection (1). That percent shall be characterized as the percentage increase in property taxes tentatively adopted by the governing body.”

Paragraph (2)(e): “1. In the hearings required pursuant to paragraphs (c) and (d), the first substantive issue discussed shall be the percentage increase in millage over the rolled-back rate necessary to fund the budget, if any, and the specificpurposes for which ad valorem tax revenues are being increased. During such discussion, the governing body shall hear comments regarding the proposed increase and explain the reasons for the proposed increase over the rolled-back rate. The general public shall be allowed to speak and to ask questions prior to adoption of any measures by the governing body. The governing body shall adopt its tentative or final millage rate prior to adopting its tentative or final budget.”

00524077

11 11 11

ATTACHMENT B

General Operating Fund

NO CHANGES

RECAP OF CHANGES BETWEEN THE RECOMMENDED BUDGET AND PROPOSED BUDGET ORDINANCE

** CHANGES IN REVENUES **

RECOMMENDED PROPOSED ORDINANCE BUDGET CHANGE

REASONS

Total General Fund Revenue 292,825,001 0 292,825,001

** CHANGES IN REQUIREMENTS **

RECOMMENDED PROPOSED ORDINANCE REASONS General Operating Fund BUDGET CHANGE Fleet Repair and Maintenance Charges (multiple

departments) 5,239,089 (468,572) 4,770,517 A reduction in revenue needed for the Fleet Management

Fund to be at it's target fund balance provided for a citywide reduction in Fleet repair and maintenance charges to departments. Reductions were made in 15 General Fund departments, including Police ($195,983), Fire Rescue ($123,445), Parks and Recreation ($95,408), SPTO ($44,391), and in 11 other departments ($9,345). The

changes listed below for the departments are in addition to the changes made to Fleet repair and maintenance charges. The individual department budget amounts in the Ordinance column may not match the amount in the Ordinance as the Fleet repair and maintenance decreases associated with this item are not included in the amounts below.

Enterprise Facilities Department 1,249,772 700,000 1,949,772 The funding for the Carter G. Woodson Museum will be a Non-Departmental appropriation in the Enterprise Facilities Department instead of a CIP project appropriation.

Finance Department 27,048,457 (700,000) 26,348,457 Remove the transfer to the General Capital Improvement Fund for the Carter G. Woodson Museum. Funding will be provided as Non-Departmental appropriation in the Enterprise Facilities Department instead of a CIP project appropriation.

Police Department 116,623,605 (119,210) 116,504,395 Various position transactions including changing a Police Grants Coordinator to a Special Projects Manager in the Administrative Services Division ($11,303) to cover additional responsibilities related to the new Community Assistance Liaison (CAL) program; and changing an Accountant I in the Fiscal Services Division to a Systems Analyst in the Information & Technology Services Division ($8,369). The New Police Take Home Vehicles Project was unfunded in the FY21 CIP budget due to estimated penny revenue losses associated with COVID-19; unfunding related operating expenditures ($146,658) and adding funding for the retention of 12 police cruisers ($7,776).

Stormwater, Pavement, and Traffic Operations 7,055,851 12,213 7,068,064 Various position transactions including changing a Pavement Technician in the Traffic Support Division to a Maintenance Worker I in the Traffic Administration Division, 40% of which will be charged to the Stormwater Utility Operating Fund; adding two Maintenance Worker I's in the Traffic Support Division and eliminating the cost for a temporary Custodian through a staffing agency ($26,000); and changing a Capital Improvements Construction Coordinator to a Special Projects Manager; 37% will be charged to the Traffic Administration Division ($1,931).

Engineering & Capital Improvements Department 5,850,971 2,205 5,853,176 The department updated their project burden amounts due to the citywide changes in fleet charges.

City Clerk 1,885,373 62,000 1,947,373 The increase is due to a shift in the cost of mail ballots for both the primary and general elections to local municipalities.

Contingency 1,314,964 511,364 1,826,328 This item is the net change in contingency needed to balance the General Fund. The contingency amount is higher than usual to account for potential additional revenue losses during the year due to the pandemic and for potential cost increases of priority funded projects.

Total General Fund Requirements 292,825,001 0 292,825,001

1

0

0

ATTACHMENT B

RECAP OF CHANGES BETWEEN THE RECOMMENDED BUDGET AND PROPOSED BUDGET ORDINANCE

** CHANGES IN REVENUES **

RECOMMENDED PROPOSED ORDINANCE REASONS Other Funds BUDGET CHANGE Water Resources Operating Fund 170,036,313 (2,084,516) 167,951,797 Rate revenue updated to match the utility rates included in

the FY21 Utility Rate Study presented to City Council on

August 20, 2020 (Stantec Report dated 6/4/2020). Water

Sales revenue decreased $1,742,805, Reclaimed decreased

$467,819, Wholesale Water decreased $40,245, Wholesale

Sewer increased $125,253, and Wastewater increased

$41,100.

Water Resources Debt 42,626,517 89,798 42,716,315 Transfer from the Water Resources Operating Fund updated per the FY21 Utility Rate Study (Stantec Report dated 6/4/2020).

Stormwater Utility Operating Fund 24,067,421 (1,017,891) 23,049,530 Rate revenue updated to match the utility rates included in the FY21 Utility Rate Study presented to City Council on August 20, 2020 (Stantec Report dated 6/4/2020). Stormwater Utility Fee revenue decreased $1,017,891.

Stormwater Debt Service 2,236,067 (25,152) 2,210,915 Transfer from the Stormwater Utility Fund updated per FY21 Utility Rate Study (Stantec Report dated 6/4/2020).

Sanitation Operating Fund 52,373,545 (1,101,914) 51,271,631 Rate revenue updated to match the utility rates included in the FY21 Utility Rate Study presented to City Council on August 20, 2020 (Stantec Report dated 6/4/2020). Charges for Services revenue decreased $1,101,914.

Equipment Replacement Fund 10,539,161 (60,402) 10,478,759 Due to the removal of the New Police Take Home Vehicles Project in the FY21 CIP Budget, there are corresponding revenues related to the project will be reduced including Internal Service Fund revenues for vehicle maintenance ($30,402) and retention of 12 police cruisers that would have been sold at auction in FY21 ($30,000).

Fleet Management 20,399,060 (1,322,066) 19,076,994 A citywide reduction in Fleet repair and maintenance charges resulted in a reduction in revenue and in associated department expenses ($1,213,586). Due to the removal of the New Police Take Home Vehicles Project in the FY21 CIP Budget, there are corresponding revenue changes including a decrease in related Internal Service Fund revenues ($116,256) and an increase due to the retention of 12 police cruisers in FY21 ($7,776).

2

ATTACHMENT B

RECAP OF CHANGES BETWEEN THE RECOMMENDED BUDGET AND PROPOSED BUDGET ORDINANCE

** CHANGES IN REQUIREMENTS **

RECOMMENDED PROPOSED ORDINANCE REASONS Other Funds BUDGET CHANGE Fleet Repair and Maintenance Charges (multiple funds) 8,329,992 (745,014) 7,584,978 A reduction in revenue needed for the Fleet Management

Fund to be at it's target fund balance provided for a citywide reduction in Fleet repair and maintenance charges to departments. Reductions were made in 18 different funds, including Sanitation ($474,612), Stormwater ($125,148), Water Resources ($98,394), Emergency Medical Services ($17,223), and 14 other funds ($29,637). The changes listed below for the fund are in addition to the changes made to Fleet repair and maintenance charges. The individual fund budget amounts in the Ordinance column may not match the amount in the Ordinance as the Fleet repair and maintenance decreases associated with this item are not included in the amounts below.

Water Resources Operating Fund 163,889,158 (788,164) 163,100,994 Increased transfer out to the Water Resources Debt Service Fund per Stantec Report 6/4/2020 ($89,798); reduced Tampa Bay Water Cost per Stantec Report 6/4/2020 ($918,802); various position transaction changes including changing a Maintenance Worker II to a Plant Maintenance Mechanic in the Cosme WTP Division for an increase of $19,382; changing a Water Systems Technician I to Water Systems Technician II in the Water Maintenance Division for an increase of $10,268; changing a Water Reclamation Plant Operator I to Water Reclamation Plant Operator II in the Southwest WRF Division for an increase of $10,333; changing a Water Plant Operator I to Water Plant Operator II in the Cosme WTP Division for an increase of $8,797; changing a Water Plant Operator II to a Water Plant Operator I in the Cosme WTP Division for a decrease of $10,007; and changing a Water Utilities Maintenance Technician to a Water Utilities Maintenance Technician II for an increase of $2,066.

Stormwater Utility Operating Fund 22,552,023 112,714 22,664,737 Increased transfer out to Stormwater Debt Service Fund per Stantec Report 6/4/2020 ($106,583); various position transactions including adding 40% of Maintenance Worker I position ($23,845) and eliminating the cost for a temporary Custodian through a staffing agency ($21,000); and changing a Capital Improvements Construction Coordinator to a Special Projects Manager, 63% charged to the Stormwater Administration Division ($3,286).

Fleet Management Fund 19,204,351 (78,000) 19,126,351 Reduction of operating expenditures associated with the Purchase of New Police Take Home Vehicles Project that was unfunded in FY21 CIP Budget due to COVID-19 revenue losses.

CAPITAL IMPROVEMENT FUNDS

** CHANGES IN REVENUES **

RECOMMENDED PROPOSED ORDINANCE REASONS FUND BUDGET CHANGE General Capital Improvement Fund (3001) 4,531,000 (700,000) 3,831,000 Deleted the transfer from the General Fund for the Carter G.

Woodson Museum. The appropriation will be a Non-

Departmental appropriation in the Enterprise Facilities Department and not a CIP project.

Public Safety Capital Improvement Fund (3025) 1,778,117 (152,573) 1,625,544 Updated FY21 revenue projection based on FY20 actual Penny for Pinellas revenue.

Citywide Infrastructure Capital Improvement Fund (3027) 23,783,516 (3,434,207) 20,349,309 Updated FY21 revenue projection based on FY20 actual Penny for Pinellas revenue.

Recreation and Culture Capital Improvement Fund (3029) 3,735,322 (350,000) 3,385,322 Updated FY21 revenue projection based on FY20 actual Penny for Pinellas revenue.

City Facilities Capital Improvement Fund (3031) 585,433 (77,476) 507,957 Updated FY21 revenue projection based on FY20 actual Penny for Pinellas revenue.

3

ATTACHMENT B

RECAP OF CHANGES BETWEEN THE RECOMMENDED BUDGET AND PROPOSED BUDGET ORDINANCE

** CHANGES IN REQUIREMENTS **

RECOMMENDED PROPOSED ORDINANCE REASONS FUND BUDGET CHANGE General Capital Improvement Fund (3001) 4,593,231 (700,000) 3,893,231 Funding for the Carter G. Woodson Museum will be a Non-

Departmental appropriation in the Enterprise Facilities

Department and not a CIP project.

Public Safety Capital Improvement Fund (3025) 7,569,769 423,000 7,992,769 Due to updated revenue projections eliminated Fire Engine

13 Replacement ($323K) and Police Take Home Vehicles

($504K). Added $1.25M for Land Acquisition for a new Fire Station 2.

Citywide Infrastructure Fund (3027) 24,614,944 (3,957,000) 20,657,944 Due to updated revenue projections eliminated or reduced

the following projects: reduced Bridge Life Extension

($300K), reduced Affordable Housing Land Acquisitions

($250K); eliminated Dredging Arterial Channels ($150K);

eliminated Emergency Dredging Small Boat Channels

($50K); eliminated Minor Storm Drainage ($500K);

Reduced Unpaved Alley Reconstruction ($125K); reduced

Brick Alley Reconstruction ($125K); revised timing of Traffic Signal/BRT System Upgrades Project which

reduced the FY21 Budget ($400K); eliminated

Neighborhood Transportation Management ($100K);

eliminated Wayfaring Signage ($150K); reduced Street and Road Improvements ($1M); eliminated Neighborhood

Partnership Grants ($75K); eliminated Bike Share ($100K);

eliminated Sidewalk Expansion ($250K); reduced Seawall Renovations & Replacement ($382K);and reduced

Overlook Dr NE Over Smacks Bayou Bridge ($300K). Also, added funding for the School Zone Upgrades Project ($300K) due to a state mandate.

Recreation and Culture Capital Improvement Fund (3029) 3,630,324 (350,000) 3,280,324 Due to updated revenue projections reduced the following

projects: Play Equipment Replacement ($100K); Park Facilities Improvements ($50K); Athletic Facilities

Improvements ($50K); Swimming Pools ($50K);

Recreation Center Improvements ($50K); and General Library Improvements ($50K).

City Facilities Capital Improvement Fund (3031) 589,732 (110,000) 479,732 Due to updated revenue projections reduced the following

projects: Fire Facilities Major Improvements ($50K); City Facility HVAC Replacement/Upgrade ($30K); and City Facility Roof/Waterproofing ($30K)

4

ATTACHMENT C

RESOLUTION NO. ______ A RESOLUTION ADOPTING A PROPOSED MILLAGE RATE FOR THE FISCAL YEAR ENDING SEPTEMBER 30, 2021; AND PROVIDING AN EFFECTIVE DATE.

WHEREAS, the amounts of money necessary to be raised from taxation to carry

on the government of the City of St. Petersburg for the fiscal year ending September 30, 2021 have been tentatively determined.

NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of St.

Petersburg, Florida, that it has been determined that in order to raise and produce the funds necessary to carry on the government of the City of St. Petersburg for the fiscal year ending September 30, 2021, there is hereby levied for said year, the various taxes set out in Sections 1 and 2, inclusive of this Resolution, to wit:

SECTION 1. The proposed millage rate for the fiscal year ending September 30,

2021, is hereby fixed and adopted at 6.7550 mills on the dollar of the assessed value of property of every kind liable for or subject to taxation by the City of St. Petersburg, Florida.

SECTION 2. The proposed millage rate referred to in the preceding Section shall

be levied for the following purposes: Purpose Mills General Fund Operating Levy 6.7550

SECTION 3. The proposed millage rate adopted herein represents an increase of 6.37% over the rolled back rate of 6.3502 mills computed pursuant to the TRIM Act (Section 200.065, Florida Statutes, as amended).

This resolution shall become effective immediately upon its adoption.

APPROVED BY DEPARTMENT __________________________ Budget Department APPROVED AS TO FORM AND SUBSTANCE __________________________ City Attorney (Designee) 00524087

ATTACHMENT D

ORDINANCE NO. 432-H

AN ORDINANCE MAKING APPROPRIATIONS FOR THE FISCAL YEAR ENDING SEPTEMBER 30, 2021; MAKING APPROPRIATIONS FOR THE PAYMENT OF THE OPERATING EXPENSES OF THE CITY OF ST. PETERSBURG, FLORIDA, INCLUDING ITS UTILITIES, AND FOR THE PAYMENT OF PRINCIPAL AND INTEREST OF REVENUE BONDS, AND OTHER OBLIGATIONS OF THE CITY OF ST. PETERSBURG, FLORIDA; MAKING APPROPRIATIONS FOR THE CAPITAL IMPROVEMENT PROGRAM OF THE CITY OF ST. PETERSBURG, FLORIDA; MAKING APPROPRIATIONS FOR THE DEPENDENT SPECIAL DISTRICTS OF THE CITY OF ST. PETERSBURG FLORIDA; ADOPTING THIS APPROPRIATIONS ORDINANCE AS THE BUDGET FOR THE CITY OF ST. PETERSBURG, FLORIDA FOR THE FISCAL YEAR ENDING SEPTEMBER 30, 2021; PROVIDING FOR RELATED MATTERS; AND PROVIDING AN EFFECTIVE DATE.

THE CITY OF ST. PETERSBURG DOES ORDAIN:

SECTION 1. That for payment of operating expenses and obligations of the City of St. Petersburg, Florida, for the fiscal year ending September 30, 2021, there is hereby appropriated out of any money in the Treasury of the City and any accruing revenues of the City available for said purposes to the funds and for the purposes hereinafter set forth, the sum of monies shown in the following schedules:

OPERATING FUNDS

GENERAL FUND Police 116,308,412 Fire Rescue 37,156,356 Leisure Services Administration 50,758,791 Neighborhood Affairs Administration 7,657,151 General Government Administration 55,657,784 Public Works Administration 13,064,923 City Development Administration 12,221,584 Total – General Fund $292,825,001

GENERAL FUND RESERVE Preservation Reserve 45,000 Total – General Fund Reserve $45,000

ENTERPRISE FUNDS Water Resources 163,002,600 Water Cost Stabilization 2,000,000

1

ATTACHMENT D

Water Equipment Replacement 1,847,000 Stormwater Utility 22,539,589 Stormwater Equipment Replacement 1,397,000 Sanitation 50,862,752 Sanitation Equipment Replacement 2,993,345 Parking 7,917,239 Mahaffey Theater 1,012,647 Pier 3,901,514 Coliseum 951,051 Sunken Gardens 1,944,199 Tropicana Field 2,046,234 Airport 1,261,393 Marina 3,955,219 Golf Courses 4,124,444 Jamestown 708,376 Port 441,227 Total - Enterprise Funds $272,905,829

SPECIAL REVENUE FUNDS Emergency Medical Services 17,484,662 Local Assistance Housing (SHIP) 600,000 Downtown Redevelopment District 5,764,938 Law Enforcement State Trust 85,607 Federal Justice Forfeiture 37,000 Grant Funds (CDBG, HOME, ESG, NSP) 3,310,991 Miscellaneous Donation Funds 1,500,000 Building Permit Special Revenue Fund 10,587,588 Special Assessments 226,100 School Crossing Guard 350,000 Weeki Wachee 170,000 Arts in Public Places 19,412 Professional Sports Facility Sales Tax 1,973,357 Total - Special Revenue Funds $42,109,655

INTERNAL SERVICE FUND RESERVES Fleet Management 38,314 Technology Services 164,222 Commercial Insurance 664,846 Billing and Collections 213,215 Total-Internal Service Fund Reserves $1,080,597

DEBT SERVICE FUNDS JP Morgan Chase Revenue Notes 2,219,615 Banc Of America Notes Debt Service 198,750 Banc of America Leasing & Capital LLC 226,495 TD Bank, N.A. 9,323,470 Sports Facility Sales Tax Debt 1,952,520

2

ATTACHMENT D

Public Service Tax Debt Service 2,901,188 Water Resources Debt 42,626,517 Stormwater Debt Service 2,188,705 Sanitation Debt Service 295,332 Total – Debt Service Funds $61,932,592

TOTAL - OPERATING BUDGET APPROPRIATIONS $670,898,674

SECTION 2. For the payment of capital improvements as set forth in the Capital Improvement Program of the City of St. Petersburg, Florida for the fiscal year ending September 30, 2021, there is hereby appropriated from the monies in the Treasury of the City and any accruing revenues of the City available for said purposes to the funds and for the purposes hereinafter set forth, the sum of monies as shown in the following schedules:

CAPITAL IMPROVEMENT FUNDS

GENERAL CAPITAL IMPROVEMENT Resurface Basketball Courts 75,000 MOB Repairs and Improvements 1,140,000 Sanitation New Facility 1,500,000 Fire Rescue Bunker Gear Replacement 600,000 Refinish Gym Floors 125,000 Magnolia Heights Special Assessment 329,000 Transfer to TD Bank, N.A. Debt Service Fund 124,231 General Capital Total $3,893,231

HOUSING CAPITAL IMPROVEMENT Affordable/Workforce Housing 600,000 Legal Collection Expense 25,000 Housing Total $625,000

PUBLIC SAFETY CAPITAL IMPROVEMENT Fire Engine 8 Replacement (F447) 317,000 Fire Station 2 Land Acquisition 1,250,000 Transfer to TD Bank, N.A. Debt Service Fund 6,425,769 Public Safety Total $7,992,769

CITYWIDE INFRASTRUCTURE CAPITAL IMPROVEMENT 157184 Bayou Grand Blvd, N of Tanglewood 1,400,000 157189 Overlook Dr NE Over Smacks Bayou 700,000 157191 Snell Isle Blvd NE Over Coffee Pot Bayou 550,000 157302 38th Ave S Over Minnow Canal 850,000 157367 58th St N Over Bear Creek 450,000 Bridge Life Extension Program 450,000 Affordable Housing Land Acquisition 1,000,000 Sanitary Sewer I & I Removal 9,000,000 Alley Reconstruction - Brick 125,000 Alley Reconstruction - Unpaved 125,000

3

ATTACHMENT D

School Zone Upgrades 300,000 Sidewalk Reconstruction 400,000 Street and Road Improvements 3,500,000 Traffic Signal/BRT System Upgrades 100,000 Bicycle Pedestrian Facilities 100,000 Complete Streets 300,000 Sidewalks - Neighborhood & ADA Ramps 250,000 Seawall Renovation & Replacement 418,000 Transfer to Debt Service Fund (Bridge) 639,944 Citywide Infrastructure Total $20,657,944

RECREATION & CULTURE CAPITAL IMPROVEMENT

Athletic Facilities Improvements 150,000 Mahaffey Theater Improvements 400,000 General Library Improvements 100,000 Park Facilities Improvements 300,000 Parks Lighting Improvements 100,000 Play Equipment Replacement 500,000 Preserve Improvements 100,000 Swimming Pool Improvements 350,000 Recreation Center Improvements 250,000 Transfer to Debt Service Fund (Shore Acres/Library) 1,030,324 Recreation and Culture Total $3,280,324

CITY FACILITIES CAPITAL IMPROVEMENT Fire Facilities Major Improvements 100,000 City Facility Roof/Waterproofing 120,000 City Facility HVAC Replace/Upgrade 120,000 Transfer to Debt Service Fund (Jamestown) 139,732 City Facilities Total $479,732

MULTIMODAL IMPACT FEES CAPITAL PROJECTS City Trails - Multi-use Trails 200,000 Complete Streets 350,000 Downtown Int & Ped Facilities 250,000 Sidewalk Expansion Program 100,000 Traffic Safety Program 200,000 Multimodal Total $1,100,000

DOWNTOWN PARKING CAPITAL PROJECTS New Meter Technology 200,000 Downtown Parking Total $200,000

4

ATTACHMENT D

WATER RESOURCES CAPITAL PROJECTS Water Treatment/Supply 490,000 Water Distribution System Improvements 12,950,000 Wastewater Collection 19,700,000 Wastewater Treatment 10,810,000 Reclaimed System Improvements 1,760,000 Water Resources Building Improvements 6,750,000 Computerized Systems 100,000 Water Resources Total $52,560,000

STORMWATER DRAINAGE CAPITAL PROJECTS Stormwater Lift Stations 80,000 1st Ave N at 58th St. SDI 1,000,000 Minor Storm Drainage 500,000 5th Avenue North at 74th St. to 76th St. 300,000 Drainage Line Rehab/Replacement 1,800,000 Lake Improvements 150,000 Little Bayou Water Quality Improvements 70,000 MLK at 62 A/N Improvements 850,000 Stormwater Vaults & Backflow Preventers 160,000 Stormwater Drainage Total $4,910,000

AIRPORT CAPITAL PROJECTS PAPIs/REILs for Runway 18/36 150,000 Runway 18/36 Rehab Construction 3,050,000 Airport Total $3,200,000

MARINA CAPITAL PROJECTS Marina Facility Improvements 150,000 Marina Parking Lot Renovation 120,000 Marina Total $270,000

BIKE/PEDESTRIAN CAPITAL PROJECTS Transfer to General CIP 241,000 Bike/Pedestrian Total $241,000

TOTAL CIP FUNDS $99,410,000

SECTION 3. For dependent districts of the City of St. Petersburg, Florida, for the fiscal year ending September 30, 2021, there are hereby appropriated from the monies and revenues of said districts the sum of monies shown on the following schedule:

DEPENDENT DISTRICTS Health Facilities Authority 4,000 Total - Dependent Districts $4,000

5

ATTACHMENT D

SECTION 4. Within the appropriations in Section 1, the following allocations are authorized:

INTERNAL SERVICE ALLOCATIONS Fleet Management 19,076,994 Equipment Replacement 10,107,136 Municipal Office Buildings 4,107,739 Technology Services 13,623,192 Technology and Infrastructure 1,624,000 Supply Management 571,196 Health Insurance 56,815,990 Life Insurance 906,985 General Liabilities Claims 2,776,838 Commercial Insurance 5,044,044 Workers' Compensation 9,959,698 Billing and Collections 12,262,975 Total - Internal Services $136,876,787

COMMUNITY SUPPORT ALLOCATIONS Pinellas Safe Harbor 150,000 Social Action Funding Program 583,800 Pinellas Homeless Leadership Board 25,000 Westcare Opioid Addiction Program 75,000 Pinellas Hope 150,000 St. Vincent de Paul 148,633 Rapid Rehousing 300,000 Neighborly Care Network (Meals on Wheels) 50,000 Contingency 15,000 Westcare Turning Point 125,000 My Brothers and Sisters Keeper 675,000 TBBBIC 50,000 2020 Wrap Around Services 30,000 2020 Wrap Around Administration 35,000 Arts Grants 405,000 Florida Orchestra 62,000 Museum of History 12,000 STEP Program 50,000 USF Endowment Marine Sciences 25,000 MLK Festival 50,000 E/W Shrine Game 5,000 International Baseball 5,000 First Friday Sponsorship 10,000 New event(s) for FY21 (TBD) 5,000 Special Event Recruitment 17,000 First Night 40,000 Youth Employment 400,000

6

ATTACHMENT D

Keep Pinellas Beautiful 10,000 Workforce Readiness 35,000 Neighborhood Partnership Matching Grants 35,000 Mayors Mini Grant Program 15,000 Reads to Me 50,000 St. Pete Paws 15,000 Independent Corridor Fund 350,000 Neighborhood Commercial Fund 175,000 Main Streets Program 220,000 Economic Development Corporation 150,000 City/Chamber Greenhouse Partnership 96,000 Qualified Target Industry Commitments 80,000 Firestone Grand Prix of St. Petersburg 22,500 St. Pete Makers 2,000 Grow Smarter Eco Dev and Workforce Initiative 270,000 Keep St. Pete Local/Localtopia 17,000 Business Recruitment Event Aide 25,000 Looper 20,000 Florida Orchestra 38,000 Museum of History 250,000 Holocaust Museum 350,000 Carter G Woodson Museum 750,500 USF Fellows program 18,000

Total – Community Support $6,492,433

Subsidies: Mahaffey Theater 450,000 Pier 1,997,000 Coliseum 195,500 Tropicana Field 1,182,420 Golf 131,000 Jamestown 124,500 Port 176,000 Total – Subsidies $4,256,420

Debt and Transfers: Debt 5,086,385 Economic Stability 500,000 Capital Improvement Funds 1,588,550 Tax Increment Funds 15,796,001 Total – Debt and Transfers $22,970,936

Contingency $1,826,328

Total – Non-Departmental $35,546,117

SECTION 5. The following categories are established as committed fund balances for future appropriation in the General Fund. The final amount will be determined subsequent to

7

ATTACHMENT D

8

year-end when the actual results and ending balances for all funds has been determined. Commitment amounts can be changed by a resolution of City Council in accordance with the City Charter:

Operating Re-appropriations - Funds that are rolled over for purchases that could not be made in the previous year due to timing or other issues.

Land Sale Proceeds - This category was established to provide a funding source for acquiring property. Proceeds from the sale of City properties valued at less than $20,000 are deposited in the General Operating Fund and are to be used for acquiring property according to Resolution 2002-126 adopted by the City Council on February 21, 2002.

Qualified Target Industry (QTI) Tax Refund Program - This category was established to provide the City’s share of payments over the next five years for the QTI program, which provides funds to local businesses for the purpose of stimulating economic growth and employment.

Local Agency Program (LAP) - This category was established to provide the City’s share of commitments for maintenance of City roads and trails as a result of grant agreements with the Florida Department of Transportation (FDOT).

Courtesy Docks and Slips - This category was established to provide the City’s share of commitments for costs associated with the ordinary and routine maintenance of the Transient Visitor Dock and Slips until March 31, 2041 as a result of a grant agreement with the Florida Fish and Wildlife Conservation Commission (FFWCC). These commitment categories are effective as of the date of this ordinance which is prior to the end of the Fiscal Year 2020.

SECTION 6. After passage of this ordinance, changes to the allocation amounts listed in Section 4 may be accomplished in the same manner as changes to appropriations pursuant to City Charter Section 3.14.

SECTION 7. This appropriation ordinance is hereby adopted as the budget for the City

of St. Petersburg for the fiscal year ending September 30, 2021. SECTION 8. In the event this Ordinance, or any line item, is not vetoed by the Mayor

in accordance with the City Charter, it shall become effective after the expiration of the fifth business day after adoption unless the Mayor notifies the City Council through written notice filed with the City Clerk that the Mayor will not veto this Ordinance, in which case this Ordinance shall become effective immediately upon filing such written notice with the City Clerk. In the event this Ordinance, or any line item, is vetoed by the Mayor in accordance with the City Charter, it shall not become effective unless and until the City Council overrides the veto in accordance with the City Charter, in which case it shall become effective immediately upon a successful vote to override the veto. APPROVED BY DEPARTMENT: APPROVED AS TO FORM AND

SUBSTANCE: ______________________________ ___________________________ Budget Department City Attorney (Designee) 00524084

ATTACHMENT E

RESOLUTION NO. ______ A RESOLUTION ADOPTING THE TENTATIVE BUDGET FOR THE FISCAL YEAR ENDING SEPTEMBER 30, 2021; AND PROVIDING AN EFFECTIVE DATE.

WHEREAS, a public hearing has been held on September 3, 2020, at 6:00 P.M.

on the tentative budget. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of St.

Petersburg, Florida: This City Council adopts Ordinance No. 432-H which includes the Mayor’s amendments to the recommended budget, as the tentative budget for the fiscal year ending September 30, 2021.

This resolution shall become effective immediately upon its adoption.

APPROVED BY DEPARTMENT __________________________ Budget Department APPROVED AS TO FORM AND SUBSTANCE __________________________ City Attorney (Designee) 00524092

141

The following page(s) contain the backup material for Agenda Item: Approving the renewal of

blanket purchase agreements with Cross Construction Services, Inc., Cross Environmental Services,

Inc., H&H Fergusons’ Contracting, Inc., John Varrati, LLC, dba Magnum Demolition, Johnsons’

Excavation & Services, Inc., Kimmins Contracting Corp., and PAW Materials, Inc., dba PAW

Demolition, for demolition services and removal of structures for the Codes Compliance Assistance

and Engineering and Capital Improvements departments; at an estimated annual cost of $345,000 per

year, for a total contract amount of $1,725,000.

Please scroll down to view the backup material.

CA-3

CA-3

ST. PETERSBURG CITY COUNCIL Consent Agenda

Meeting of September 3, 2020 To: The Honorable Ed Montanari, Chair, and Members of City Council Subject: Approving the renewal of blanket purchase agreements with Cross Construction Services, Inc., Cross Environmental Services, Inc., H&H Fergusons’ Contracting, Inc., John Varrati, LLC, dba Magnum Demolition, Johnsons’ Excavation & Services, Inc., Kimmins Contracting Corp., and PAW Materials, Inc., dba PAW Demolition, for demolition services and removal of structures for the Codes Compliance Assistance and Engineering and Capital Improvements departments; at an estimated annual cost of $345,000 per year, for a total contract amount of $1,725,000. Explanation: On September 7, 2017, City Council approved three-year blanket purchase agreements for demolition services and removal of structures through September 30, 2020. The agreements have one, two-year renewal option. This is the first and final renewal. The contractors provide demolition services for the City, including removal of structures, foundations, driveways, walkways, footers, slabs, steps, basements and debris. In addition, vendors obtain permits, disconnect utilities and grade the lots to surrounding grade, using clean-fill dirt and applying grass seeds or sod. The Procurement and Supply Management Department recommends for renewal:

Demolition and Removal of Structures..............$1,725,000

(Two-years @ $345,000 per year)

Original agreement amount $1,035,000 1st renewal 690,000 Total contract amount $1,725,000

The contractors have agreed to renew under the same terms and conditions of RFQ No. 6485, dated May 12, 2017. Administration recommends renewal of the agreement based on the contractors’ past satisfactory performance and demonstrated ability to comply with the terms and conditions of the agreements. The renewal will be effective from the date of approval through September 30, 2022, with no renewals remaining. Cost/Funding/Assessment Information: Funds have been previously appropriated in the Sanitation Operating Fund (4021), Codes Compliance Department, Demolition Division (110-1129), and the Public Safety Capital Improvements Fund (3025), Engineering and Capital Improvements Department, Capital Improvements Division (130-2465).

Attachments: Resolution

1

A RESOLUTION APPROVING THE RENEWAL OPTION TO

THE AGREEMENTS WITH CROSS CONSTRUCTION

SERVICES, INC., CROSS ENVIRONMENTAL SERVICES,

INC., H&H FERGUSONS’ CONTRACTING, INC., JOHN

VARRATI, LLC DBA MAGNUM DEMOLITION, JOHNSONS’

EXCAVATION & SERVICES, INC., KIMMIS CONTRACTING

CORP., AND PAW MATERIALS, INC. DBA PAW

DEMOLITION FOR DEMOLITION SERVICES AND

REMOVAL OF STRUCTURES FOR THE CODES

COMPLIANCE ASSISTANCE AND ENGINEERING AND

CAPITAL IMPROVEMENTS DEPARTMENTS TO EXTEND

THE TERM AND INCREASE THE COMBINED CONTRACT

AMOUNT IN THE AMOUNT OF $690,000 FOR THIS

RENEWAL TERM THROUGH SEPTEMBER 30, 2022;

PROVIDING THAT THE TOTAL COMBINED CONTRACT

AMOUNT FOR THE ABOVE REFERENCED AGREEMENTS

SHALL NOT EXCEED $1,725,000; AUTHORIZING THE

MAYOR OR HIS DESIGNEE TO EXECUTE ALL

DOCUMENTS NECESSARY TO EFFECTUATE THESE

TRANSACTIONS; AND PROVIDING AN EFFECTIVE DATE.

WHEREAS, on September 7, 2017 City Council approved three-year blanket

purchase agreements with a two-year renewal option to Cross Construction Services, Inc., Cross

Environmental Services, Inc., H&H Fergusons’ Contracting, Inc., John Varrati, LLC DBA

Magnum Demolition, Johnsons’ Excavation & Services, Inc., Kimmis Contracting Corp., and

Paw Materials, Inc. DBA Paw Demolition for demolition services and removal of structures for

the Codes Compliance Assistance and Engineering and Capital Improvements departments at a

total combined contract amount of $1,035,000 for the initial term through September 30, 2020;

and

WHEREAS, the City desires to exercise the renewal option to extend the term and

increase the combined contract amount for the above referenced agreements in the amount of

$690,000 ($345,000 per year) for this renewal term through September 30, 2022; and

WHEREAS, Cross Construction Services, Inc., Cross Environmental Services,

Inc., H&H Fergusons’ Contracting, Inc., John Varrati, LLC DBA Magnum Demolition,

Johnsons’ Excavation & Services, Inc., Kimmis Contracting Corp., and Paw Materials, Inc. DBA

Paw Demolition has agreed to renew under the same specifications, terms and conditions of RFQ

No. 6485, dated May 12, 2017; and

WHEREAS, the Procurement & Supply Management Department recommends

approval of this resolution.

NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of

St. Petersburg, Florida the renewal option to agreements with Cross Construction Services, Inc.,

Cross Environmental Services, Inc., H&H Fergusons’ Contracting, Inc., John Varrati, LLC DBA

Magnum Demolition, Johnsons’ Excavation & Services, Inc., Kimmis Contracting Corp., and

2

Paw Materials, Inc. DBA Paw Demolition for demolition services and removal of structures for

the Codes Compliance Assistance and Engineering and Capital Improvements departments to

extend the term and increase the combined contract amount in the amount of $690,000 for this

renewal term though September 30, 2022 are hereby approved.

BE IT FURTHER RESOLVED that the total combined contract amount for the

above referenced agreements shall not exceed $1,725,000.

BE IT FURTHER RESOLVED that the Mayor or his designee is authorized to

execute all documents necessary to effectuate these transactions.

This Resolution shall become effective immediately upon its adoption.

Approved as to Form and Substance:

______________________________

City Attorney (Designee) 00524126

Page 1 of 1

-- City of St. Petersburg Authorization Request --

General Authorization

Request #

69359

Name: Pocengal, Nicholas W Request Date: 14-AUG-2020 Status: APPROVED

Authorization Request

Subject: Demo & Removal of Structures, Sept 3 Council Item

Message: Submitted for your approval, please find attached Consent Write-up for Demolition & Removal of Structures, scheduled to go before City Council on September 3, 2020. Resolution currently in development and will be included on the finalized version when posted into City Clerk's Office Questys system. Should you have any questions, please contact me at extension 3387. Thank you.

SupportingDocumentation:

912-40 Demolition Removal of Structures September 3 2020 - Approval Request.pdf

Approver Completed By Response ResponseDate

Type

0 Pocengal, Nicholas W SUBMITTED 14-AUG-2020

1 Wahl, Margaret Brown Wahl, Margaret Brown APPROVE 14-AUG-2020 User Defined

2 Gerdes, Robert M Gerdes, Robert M APPROVE 15-AUG-2020 User Defined

147

The following page(s) contain the backup material for Agenda Item: Approving an increase in

allocation for earthwork, grading and drainage services with Joseph Bryant Landscaping and Site

Work Event Planning, LLC, for the Engineering and Capital Improvements and Parks and

Recreation departments, in the amount of $155,000, for a total contract amount of $405,000.

Please scroll down to view the backup material.

CB-1

CB-1

ST. PETERSBURG CITY COUNCIL Consent Agenda

Meeting of September 3, 2020 To: The Honorable Ed Montanari, Chair, and Members of City Council Subject: Approving an increase in allocation for earthwork, grading and drainage services with Joseph Bryant Landscaping and Site Work Event Planning, LLC, for the Engineering and Capital Improvements and Parks and Recreation departments, in the amount of $155,000, for a total contract amount of $405,000. Explanation: On November 21, 2016, City Council approved a three-year blanket purchase agreement for earth work, grading and drainage services for $150,000. This agreement had one two-year renewal option. On November 7, 2019, City Council approved the first and final renewal. The vendor provides all labor and equipment necessary for rough and fine grading operations of simple to moderate complexity. The services are used for large grading projects when there are time constraints, or when City crew capacity is unavailable. The service also includes sod stripping and regrading large parks in preparation for re-sodding. The vendor has access to a wide range of equipment and can deploy its workforce on short notice to support City requirements. The increase in usage is due to the installation and grading of the Spa Beach area at the St. Pete Pier™. The vendor will also provide ongoing maintenance to Spa Beach by grading it on a weekly basis for the remainder of the contract term, at an estimated annual cost of $130,000 per year. The Procurement and Supply Management Department, in cooperation with the Engineering and Capital Improvements and Parks and Recreation departments, recommends for approval:

Joseph Bryant Landscaping and Site Work Event Planning, LLC................$405,000

Original agreed amount $150,000

1st renewal Allocation increase

100,000 155,000

Total agreed amount $405,000 Cost/Funding/Assessment Information: Funds have been previously appropriated in the Recreation & Culture Capital Improvement Fund (3029), Weeki Wachee Capital Improvements Fund (3041), General Capital Improvement Fund (3001), and General Fund (0001). Attachments: Resolution

A RESOLUTION APPROVING AN INCREASE IN THE

AMOUNT OF $155,000 TO THE ALLOCATION FOR THE

AGREEMENTS WITH JOSEPH BRYANT LANDSCAPING

AND SITE WORK EVENT PLANNING, LLC FOR

EARTHWORK, GRADING AND DRAINAGE SERVICES;

PROVIDING THAT THE TOTAL COMBINED CONTRACT

AMOUNT FOR THE ABOVE REFERENCED AGREEMENTS

SHALL NOT EXCEED $405,000; AUTHORIZING THE MAYOR

OR HIS DESIGNEE TO EXECUTE ALL DOCUMENTS

NECESSARY TO EFFECTUATE THIS TRANSACTION; AND

PROVIDING AN EFFECTIVE DATE.

WHEREAS, on November 21, 2016, City Council approved three-year agreements

with Joseph Bryant Landscaping and Site Work Event Planning, LLC. for earthwork, grading and

drainage services for the Engineering and Capital Improvements and Parks and Recreation

departments at a total combined contract amount of $150,00 for the initial term; and

WHEREAS, on November 7, 2019, City Council approved the two-year renewal

option to the Agreements and increased the contract amount for the above referenced agreements

in the amount of $100,000 for the renewal term; and

WHEREAS, an additional increase in the amount of $155,000 to the allocation for

these Agreements is necessary for the increased usage due to the installation and grading of sod of

the Spa Beach area at the St. Pete Pier™; and

WHEREAS, the Procurement and Supply Management Department, in cooperation

with the Engineering and Capital Improvements and Parks and Recreation departments,

recommends approval of this resolution.

NOW THEREFORE BE IT RESOLVED by the City Council of the City of St.

Petersburg, Florida, that an increase in the amount of $155,000 to the allocation for the Agreements

with Joseph Bryant Landscaping and Site Work Event Planning, LLC. for earthwork, grading and

drainage services is hereby approved.

BE IT FURTHER RESOLVED that the total combined contract amount for the

above referenced Agreements shall not exceed $405,000.

BE IT FURTHER RESOLVED that the Mayor or his designee is authorized to

execute all documents necessary to effectuate this transaction.

This Resolution shall become effective immediately upon its adoption.

Approved by:

___________ City Attorney (Designee) 00524113

Page 1 of 1

-- City of St. Petersburg Authorization Request --

General Authorization

Request #

69718

Name: Pocengal, Nicholas W Request Date: 18-AUG-2020 Status: APPROVED

Authorization Request

Subject: Earthwork, Grading & Drainage Svcs, Sep. 3 Council

Message: Submitted for your approval, please find attached Consent Write-up for Earthwork, Grading and Drainage Services, scheduled to go before City Council on September 3, 2020. Resolution currently in development and will be included on the finalized version when posted into City Clerk's Office Questys system. Should you have any questions, please contact me at extension 3387. Thank you.

SupportingDocumentation:

988-32 Earthwork, Grading and Drainage Services, September 3, 2020 - Approval Request.pdf

Approver Completed By Response ResponseDate

Type

0 Pocengal, Nicholas W SUBMITTED 18-AUG-2020

1 McKee, Stacey Pevzner McKee, Stacey Pevzner APPROVE 18-AUG-2020 User Defined

2 Tankersley, Claude Duval Tankersley, Claude Duval APPROVE 18-AUG-2020 User Defined

152

The following page(s) contain the backup material for Agenda Item: Approving the purchase of one

(1) wheel loader from Great Southern Equipment Company for the Stormwater, Pavement and

Traffic Operations Department, at a total cost of $212,589.30.

Please scroll down to view the backup material.

CB-2

CB-2

ST. PETERSBURG CITY COUNCIL Consent Agenda

Meeting of September 3, 2020

To: The Honorable Ed Montanari, Chair, and Members of City Council Subject: Approving the purchase of one (1) wheel loader from Great Southern Equipment Company for the Stormwater, Pavement and Traffic Operations Department, at a total cost of $212,589.30. Explanation: This purchase is being made from Florida Sheriffs Association Contract No. FSA19-VEH17.0. The vendor will furnish and deliver one 3.0 cubic yard wheel loader. The new wheel loader is being purchased for lot clearing and debris pick-up from various site locations, loading and transporting of various equipment for citywide events. The new wheel loader has a life expectancy of seven to 10 years and is replacing a unit that is 11-years old. The replacement unit will be sold at public auction. The loader is powered by a Tier 4 Final, EPA-compliant Cummins QSB6.7 model diesel engine. The loader features auto idle shut down, auto power up, and telematics that promote seven percent reduction in fuel cost and maintenance requirements. This asset has been reviewed and meets the City’s Green Fleet initiatives and mission capability requirements. The Procurement and Supply Management Department, in cooperation with the Fleet Management Department and the Office of Sustainability and Resiliency, recommends for award utilizing Florida Sheriffs Association Contract No. FSA19-VEH17.0:

Great Southern Equipment Company (Tampa)……………...………...$212,589.30

Loader, Wheel, Hitachi, ZW220 1 EA @ $212,589.30

The vendor has met the specifications, terms and conditions of the Florida Sheriffs Association Contract No. FSA19-VEH17.0, effective through September 30, 2020. This purchase is made in accordance with Section 2-219 (c) of the City Code, which authorizes the Mayor, or his designee, to purchase from other government entities. Cost/Funding/Assessment Information: Funds have been previously appropriated in the Equipment Replacement Fund (5002), Fleet Management Department, Fleet Mechanical Costs Division (800-2527). Attachments: Image Resolution

Loader, Wheel, Hitachi, ZW220

RESOLUTION NO. 2020-____

A RESOLUTION APPROVING THE PURCHASE OF ONE

WHEEL LOADER FROM GREAT SOUTHERN EQUIPMENT

COMPANY AT A TOTAL COST NOT TO EXCEED $212,589.30

UTILIZING THE FLORIDA SHERIFF’S ASSOCIATION

CONTRACT NO. FSA19-VEH17.0; AUTHORIZING THE

MAYOR OR HIS DESIGNEE TO EXECUTE ALL DOCUMENTS

NECESSARY TO EFFECTUATE THIS TRANSACTION; AND

PROVIDING AN EFFECTIVE DATE.

WHEREAS, the City desires to purchase one wheel loader to replace a vehicle that

has reached the end of its economic useful life from Great Southern Equipment Company utilizing

the Florida Sheriff’s Association Contract No. FSA19-VEH17.0; and

WHEREAS, pursuant to Section 2-219(c) of the Procurement Code, the City is

permitted to purchase vehicles from the Florida Sheriffs Association negotiated purchase program;

and

WHEREAS, Dobbs Equipment, LLC has met the specifications, terms and

conditions of the Florida Sheriff’s Association Contract No. FSA19-VEH17.0; and

WHEREAS, the Procurement and Supply Management Department, in cooperation

with the Fleet Management Department and the Office of Sustainability and Resiliency,

recommends approval of this award to Great Southern Equipment Company.

NOW THEREFORE BE IT RESOLVED by the City Council of the City of St.

Petersburg, Florida, that the purchase of one wheel loader from Great Southern Equipment

Company at a total cost not to exceed $212,589.30 utilizing the Florida Sheriff’s Association

Contract No. FSA19-VEH17.0 is hereby approved.

BE IT FURTHER RESOLVED that the Mayor or his designee is authorized to

execute all documents necessary to effectuate this transaction.

This Resolution shall become effective immediately upon its adoption.

Approved by:

__________________

City Attorney (Designee) 00523665

Page 1 of 1

-- City of St. Petersburg Authorization Request --

General Authorization

Request #

69619

Name: Pocengal, Nicholas W Request Date: 17-AUG-2020 Status: APPROVED

Authorization Request

Subject: Wheel Loader, September 3 Council Item

Message: Submitted for your approval, please find attached Consent Write-up for a Wheel Loader, scheduled to go before City Council on September 3, 2020. Resolution currently in development and will be included on the finalized version when posted into City Clerk's Office Questys system. Should you have any questions, please contact me at extension 3387. Thank you.

SupportingDocumentation:

998-36 Wheel Loader, September 3, 2020 - Approval Request.pdf

Approver Completed By Response ResponseDate

Type

0 Pocengal, Nicholas W SUBMITTED 17-AUG-2020

1 McKee, Stacey Pevzner Stanford, Lance N APPROVE 17-AUG-2020 User Defined

2 Tankersley, Claude Duval Tankersley, Claude Duval APPROVE 18-AUG-2020 User Defined

158

The following page(s) contain the backup material for Agenda Item: A resolution accepting a bid

from American Lighting and Signalization, LLC. for the West End Fire Station #2, in the amount of

$189,652; rescinding an unencumbered appropriation in the City Facilities Capital Improvement

Fund (3031) in the amount of $86,000 from the Infrastructure TBD FY20 Project (17231);

approving a supplemental appropriation in the amount of $86,000 from the increase in the

unappropriated balance of the City Facilities Capital Improvement Fund (3031), resulting from the

above rescission, to the Fire Station #2 Project (17132); and providing an effective date.

Please scroll down to view the backup material.

CB-3

CB-3

Continued on Page 2

ST. PETERSBURG CITY COUNCIL

Consent Agenda Meeting of September 3, 2020

To: The Honorable Ed Montanari, Chair, and Members of City Council Subject: A resolution accepting a bid from American Lighting and Signalization, LLC. for the West End Fire Station #2, in the amount of $189,652; rescinding an unencumbered appropriation in the City Facilities Capital Improvement Fund (3031) in the amount of $86,000 from the Infrastructure TBD FY20 Project (17231); approving a supplemental appropriation in the amount of $86,000 from the increase in the unappropriated balance of the City Facilities Capital Improvement Fund (3031), resulting from the above rescission, to the Fire Station #2 Project (17132); and providing an effective date. Explanation: The Procurement and Supply Management Department received one bid for the West End Fire Station #2, Emergency Traffic Signal, for the St. Petersburg Fire Rescue Department leased building located at 3100 66th Street North. The bid was opened on July 23, 2020, and is tabulated as follows:

Bidder Amount

American Lighting and Signalization, LLC (Dover, FL) $189,652

The contractor will furnish all labor, material and equipment necessary for site preparation, construction of concrete foundation for the traffic signal concrete pole, construction of concrete strain pole for traffic signalization, traffic controller assembly and span wire assembly, sidewalk reconstruction, signing and pavement markings to provide an emergency traffic signal for the safety of fire staff, the public, and in order to assist with maintaining appropriate response times. The signal will be located immediately north of the station on 66th Street. The project location is in the state right-of-way and the construction agreement 2020-C-799-00001 has been signed between Florida Department of Transportation (FDOT) and the City on June 16, 2020. The Procurement and Supply Management Department, in cooperation with the Engineering and Capital Improvements Department, recommends an award to:

American Lighting and Signalization, LLC (Dover, FL) ...................................…...$189,652 American Lighting and Signalization, LLC, the sole responsive and responsible bidder, has met the specifications, terms and conditions of IFB No. 7772, dated July 1, 2020. They are a prequalified contractor for traffic signals with FDOT and have performed similar work for them, the City of Jacksonville and Hillsborough and Polk counties. References have been checked and are acceptable. Principal of the firm is Phil Karaganis, vice president. The project superintendent is Wayne Hines. The contractor will begin work at the West End Fire Station #2 within approximately ten (10) calendar days from written notice to proceed and is scheduled to complete the emergency traffic signal within one hundred and fifty (150) consecutive calendar days thereafter and final completion within thirty (30) calendar days after the City’s delivery of the punch list. This project does not qualify under the City Code 2-234, Small Business Enterprise Assistance program, since it must meet Florida Department of Transportation regulations. Recommendation: Administration recommends City Council approve the attached resolution accepting a bid from American Lighting and Signalization, LLC. for the West End Fire Station #2, in the amount of $189,652; rescinding an unencumbered appropriation in the City Facilities Capital Improvement Fund (3031) in the amount of $86,000 from the Infrastructure TBD FY20 Project (17231); approving a supplemental appropriation in the amount of $86,000 from the increase in the unappropriated balance of the City Facilities Capital Improvement Fund (3031), resulting from the above rescission, to the Fire Station #2 Project (17132); and providing an effective date.

Traffic Signal, West End Fire Station No. 2 September 3, 2020

Page 2

Cost/Funding/Assessment Information: A portion of the funds have been previously appropriated in the City Facilities Capital Improvement Fund (3031), Fire Station #2 Project (17132). Additional funding will be available after the approval of a rescission of an unencumbered appropriation in the City Facilities Capital Improvement Fund (3031) in the amount of $86,000 from the Infrastructure TBD FY20 Project (17231) and a supplemental appropriation in the amount of $86,000 from the increase in the unappropriated balance of the City Facilities Capital Improvement Fund (3031), resulting from the above rescission, to the Fire Station #2 Project (17132). Attachments: Map Resolution

West End Fire Station #2Emergency Traffic Signal

Project No. 19096-112

±§̈¦I-275

ENGINEERING AND CAPITAL IMPROVEMENTS DEPARTMENT

CITY of ST PETERSBURGAPPROVED BY: DATE:

8/4/2020

PROJECT LOCATION

PROJECT LOCATION

Docu

ment

Path:

S:\Ar

cGIS\

2020

\ENG\

1909

6-112

Wes

t End

FS #2

Emerg

ency

Sign

al.mx

d

FireStation

#2

1

RESOLUTION NO. 2020-____

A RESOLUTION ACCEPTING THE BID AND APPROVING

THE AWARD OF A CONTRACT TO AMERICAN LIGHTING

AND SIGNALIZATION, LLC FOR WEST END FIRE STATION,

#2, EMERGENCY TRAFFIC SIGNAL PROJECT FOR A TOTAL

CONTRACT AMOUNT NOT TO EXCEED $189,652;

AUTHORIZING THE MAYOR OR HIS DESIGNEE TO

EXECUTE ALL DOCUMENTS NECESSARY TO

EFFECTUATE THIS TRANSACTION; RESCINDING AN

UNENCUMBERED APPROPRIATION IN THE CITY

FACILITIES CAPITAL IMPROVEMENT FUND (3031) IN THE

AMOUNT OF $86,000 FROM THE INFRASTRUCTURE TBD

FY20 PROJECT (17231); APPROVING A SUPPLEMENTAL

APPROPRIATION IN THE AMOUNT OF $86,000 FROM THE

INCREASE IN THE UNAPPROPRIATED BALANCE OF THE

CITY FACILITIES CAPITAL IMPROVEMENT FUND (3031),

RESULTING FROM THE ABOVE RESCISSION, TO THE FIRE

STATION #2 PROJECT (17132); AND PROVIDING AN

EFFECTIVE DATE.

WHEREAS, the Procurement & Supply Management Department received one (1)

bid for the West End Fire Station #2, Emergency Traffic Signal in response to IFB No. 7772, dated

July 1, 2020; and

WHEREAS, American Lighting and Signalization, LLC, the sole responsive and

responsible bidder, has met the specifications, terms and conditions of IFB No. 7772; and

WHEREAS, funding for this contract will be available after a (i) rescission of an

unencumbered appropriation in the City Facilities Capital Improvement Fund (3031) in the amount

of $86,000 from the Infrastructure TBD FY20 Project (17231) and (ii) supplemental appropriation

in the amount of $86,000 from the increase in the unappropriated balance of the City Facilities

Capital Improvement Fund (3031), resulting from the above rescission, to the Fire Station #2

Project (17132); and

WHEREAS, the Procurement and Supply Management Department, in cooperation

with the Engineering and Capital Improvements Department, recommends approval of this award.

NOW THEREFORE, BE IT RESOLVED by the City Council of the City of St.

Petersburg, Florida, that the bid is accepted and the award of a contract to American Lighting and

Signalization, LLC for the West End Fire Station #2, Emergency Traffic Signal Project for a total

contact amount not to exceed $189,652 is hereby approved.

BE IT FURTHER RESOLVED that the Mayor or his designee is authorized to execute

all documents necessary to effectuate this transaction.

BE IT FURTHER RESOLVED that the unencumbered appropriation in the amount

of $86,000 in the City Facilities Capital Improvement Fund (3031), Infrastructure TBD FY20 Project (17231) is hereby rescinded.

2

BE IT FURTHER RESOLVED that there are hereby approved from the

unappropriated balance of the City Facilities Capital Improvement Fund (3031), resulting from the above rescission, the following supplemental appropriation for Fiscal Year 2020:

City Facilities Capital Improvement Fund (3031)

Fire Station #2 Project (17132) $86,000

This resolution shall become effective immediately upon its adoption.

Approved by:

City Attorney (Designee) Budget 00523781

Page 1 of 1

-- City of St. Petersburg Authorization Request --

General Authorization

Request #

69761

Name: Pocengal, Nicholas W Request Date: 18-AUG-2020 Status: APPROVED

Authorization Request

Subject: Traffic Signal, W End Fire Station#2, 9/3 Council

Message: Submitted for your approval, please find attached Consent Write-up for Traffic Signal, West End Fire Station #2, scheduled to go before City Council on September 3, 2020. Resolution currently in development and will be included on the finalized version when posted into City Clerk's Office Questys system. Should you have any questions, please contact me at extension 3387. Thank you.

SupportingDocumentation:

968-82 Traffic Signal West End Fire Station No. 2, September 3 2020 - Approval Request.pdf

Approver Completed By Response ResponseDate

Type

0 Pocengal, Nicholas W SUBMITTED 18-AUG-2020

1 McKee, Stacey Pevzner McKee, Stacey Pevzner APPROVE 18-AUG-2020 User Defined

2 Tankersley, Claude Duval Tankersley, Claude Duval APPROVE 19-AUG-2020 User Defined

166

The following page(s) contain the backup material for Agenda Item: Acknowledging the selection of

Biltmore Construction Co., Inc. (“Biltmore”) as the most qualified firm to provide preconstruction

and construction phase services for the Corridor Improvements along 22nd Street South from 1st

Avenue South to 11th Avenue South Project; authorizing the Mayor or his designee to execute a

Construction Manager at Risk Agreement with a Guaranteed Maximum Price between the City of St.

Petersburg, Florida and Biltmore; authorizing the City Attorney’s Office to make non-substantive

changes to the Construction Manager at Risk Agreement with a Guaranteed Maximum Price;

authorizing payment to Biltmore in an amount not to exceed $50,600 for preconstruction phase

(ECID Work Order No. 19067-119 and 19067-219; Oracle Project Nos 17589).

Please scroll down to view the backup material.

CB-4

CB-4

Continued on Page 2

ST. PETERSBURG CITY COUNCIL Consent Agenda

Meeting of September 3, 2020 To: The Honorable Ed Montanari, Chair, and Members of City Council Subject: Acknowledging the selection of Biltmore Construction Co., Inc. (“Biltmore”) as the most qualified firm to provide preconstruction and construction phase services for the Corridor Improvements along 22nd Street South from 1st Avenue South to 11th Avenue South Project; authorizing the Mayor or his designee to execute a Construction Manager Agreement between the City of St. Petersburg, Florida and Biltmore; authorizing the City Attorney’s Office to make non-substantive changes to the Construction Manager Agreement; authorizing payment to Biltmore in an amount not to exceed $50,600 for preconstruction phase (ECID Work Order No. 19067-119 and 19067-219; Oracle Project Nos 17589).

Explanation: On March 30, 2020, the Procurement and Supply Management issued Request for Qualifications No. 7619 for a Construction Manager for the 22nd Street Corridor Improvements, Phase 1. On April 16, 2020, the City received two Statements of Qualifications (SOQs) from the following firms:

1. Biltmore Construction Co., Inc. 2. LEMA Construction & Developers, Inc.

Evaluation of the Statements of Qualifications was conducted by the following staff:

Brejesh Prayman, Engineering & Capital Improvements Director Cheryl Stacks, Transportation Manager Evan Birk, Engineering Design Manager Brian Caper, Economic Development Officer Mark Laney, Capital Improvements Construction Coordinator Michael Gebler, Capital Projects Coordinator

The Statements of Qualifications were evaluated based on the following criteria:

• Team background and experience

• Project approach

• Relevant project examples

• Certification as a Small, Minority, Women and Disadvantaged Business Enterprise On May 13, 2020, the evaluation committee met to review the statements of qualifications. Both firms were invited for presentations and interviews. On June 18, 2020, the evaluation committee heard presentations from each of the shortlisted firms and ranked Biltmore Construction, Co., Inc. (“Biltmore” or “CM”) as the top-ranked firm, followed by LEMA Construction & Developers, Inc. Biltmore was determined to be the most qualified firm, taking into consideration their qualifications and experience, understanding of the project, local knowledge, appropriate staffing structure, prior experience with corridor improvements, and the evaluation criteria set forth in the RFQ. Administration has negotiated a construction manager agreement (CM Agreement) with Biltmore Construction, Co., Inc. for a lump sum amount of $50,600 for pre-construction services with Biltmore Construction, Co. Inc. Once City Council approves the attached resolution, the City and Biltmore Construction, Co., Inc. will enter into a CM Agreement for the 22nd Street South corridor improvements. The CM will provide preconstruction phase services in accordance with the terms and conditions set forth in the CM Agreement. The CM shall provide control estimate proposals for each of the four elements of the Project, which shall become a part of the CM Agreement through amendment(s) for the construction of the corridor improvements along 22nd Street South, from 1st Avenue South to 11th Avenue South within the City’s construction cost budget.

Construction Manager, 22nd St. S. Corridor Improvements September 3, 2020

Page 2

Preconstruction services with the CM include, but are not limited to:

• Work with the City’s A/E to develop a cost plan

• Providing cost estimates during the design phases

• Constructability reviews

• Value engineering

• Developing project scheduling

• Public outreach

• Vendor outreach and Procurement coordination The Preconstruction phase fees are as follows:

Total preconstruction phase fee: $50,600

The construction phase will commence upon City Council’s approval of an amendment to incorporate control estimates and the issuance of a Notice to Proceed. The amendment will include the cost of the work, plus the construction manager’s fee. During the construction phase, the CM will assume the responsibility as the contractor and will proceed to construct the improvements. All construction work will be competitively bid by the CM in accordance with the terms and conditions set forth in the CM agreement. The Engineering and Capital Improvements Department will negotiate with Biltmore Construction Co., Inc. for construction phase services after bids are received. Biltmore has provided similar services for the cities of Largo and St. Petersburg and for Pasco County, and has performed satisfactorily. The principals of the firm are ED Parker, Jr., president, and Travis Parker, COO, vice president.

The Procurement and Supply Management Department, in cooperation with the Engineering and Capital Improvements Department, recommends that City Council approve the attached resolution. Biltmore will present an SBE utilization proposal to the SBE Committee during the pre-construction phase while the costs for construction of Project components are finalized. After preconstruction services are provided by Biltmore, ECID will amend the agreement to include the construction phase. The amendment will include the approved SBE goal, apprentice, disadvantaged worker, and responsible wage ordinance requirements. Cost/Funding/Assessment Information: Funding has been previously appropriated in the Community Development Block Grand Fund (1111) CDBG 22nd Street So/Deuces Imp Project (17589). Attachments: Technical Evaluation (3 pages) Resolution

Technical Evaluation for RFQ 7526 958-26 Construction Manager, 22nd Street Corridor Improvements, Phase I

Summary Work Statement The City received two Statements of Qualifications (SOQs) for RFQ 7619 Construction Manager, 22nd Street Corridor Improvements, Phase I. The successful firm will participate in the design process, perform construction cost estimating and constructability services, value engineering analysis, manage the schedule and perform construction services. The two SOQs were received from:

1. Biltmore Construction Co., Inc. 2. LEMA Construction & Developer’s, Inc.

Evaluation Committee Evaluations of the SOQs were conducted by the following team members:

Brejesh Prayman, Engineering and Capital Improvements Director Evan Birk, Engineering Design Manager Cheryl Stacks, Transportation Manager Brian Caper, Economic Development Officer Mark Laney, Capital Improvements Construction Coordinator Michael Gebler, Capital Projects Coordinator

Evaluation Criteria The SOQs were evaluated based on the following criteria:

• Team background and experience

• Project approach

• Relevant project examples

• Small, Minority, Women and Disadvantaged Business Enterprise

Offerors’ Profiles Below is a profile of each firm and a summary of the strengths and weaknesses of each as reported after the initial, independent review. Biltmore Construction Co., Inc. is a Florida corporation, with its headquarters in Belleair, Florida. They have been in business for 66 years. They have 50 employees to service the City. Strengths include: The team has been working together for decades on several projects, showing continuity; extensive experience with park and streetscape projects; reported no legal proceedings; exhibited good cost control measures; and generated preliminary costing of the draft plan. They are the leading CM with the first LEED facility; have evaluated the Envision credits and estimated locations to gain points. They provided a document management program to be utilized by the City Project Team and Design Team; have already met with the Deuces Live and plans to attend regular meetings to provide construction schedule updates. Their project approach included an in-depth analysis of the site and developed sequence of operations and phasing to minimize impacts on residents and businesses. They provided a strong approach to cost control in the pre-construction and construction phases; have experience with FDOT grant projects; and demonstrated a clear plan to attract SBE/WBE/DBE subs with a recruiting sessions, training and assistance. Weaknesses include: No noted weaknesses The Statement of Qualifications exceeded the RFQ requirements

LEMA Construction & Developers, Inc. is a Florida corporation, with its headquarters in St. Petersburg. They have been in business for 16 years. They have 28 employees to serve the City.

Strengths include: They have significant St. Petersburg experience and had previous projects along the 22nd Street South. They are a certified Small Business Enterprise. Their project executive had experience with FDOT, but not with the current firm.

Weaknesses: They do not have experience with a “festival street”; their proposed project manager, who had significant FDOT and roadway experience, is no longer with the firm, and the project manager duties were to be shared among different staff. The team is new and did not exhibit that they had worked together previously. Their approach to community communication was unclear. They did not mention available subs or a vetting process for subs. Most of their roadway experience is highway experience; experience provided was shown as different contracting methods from the requirements or was not performed by the firm. Clarification was requested. They were not familiar with, and did not provide, an approach for traffic control and impacts on businesses and residents. Site evaluation was limited, and overall project approach was weak. They did not address Envision. There were concerns about their staffing and resource availability to manage and administer the project.

The Statement of Qualifications meets the RFQ requirements.

Shortlisting and Oral Presentations

The SOQs were initially evaluated solely on the evaluation criteria established in the RFQ. A shortlist meeting was held on May 13, 2020. Both firms were invited to give presentation and interviews. While letters inviting the firms were provided, listing items for presentation, additional clarification was requested from LEMA Construction & Developer’s based on the project experience they submitted.

Oral presentations and interviews took place on June 18, 2020, to clarify questions of the evaluation committee and advisory staff and to ensure a full understanding of the City’s requirements. The evaluation committee ranked the firms as follows:

Rank Firm 1. Biltmore Construction Co., Inc.2. LEMA Construction & Developers, Inc.

Recommendation for Award

On June 18, 2020, the evaluation committee deliberated to discuss the SOQs, presentations and interviews of both firms. Biltmore Construction Co., Inc. was recommended for the award as the highest ranked firm, since it meets the requirements of RFQ No. 7619 and has been determined to be the most qualified firm, taking into consideration the firm’s years of providing these services and the evaluation criteria set forth in the RFQ.

The firm was selected for the following reasons:

• The firm has an experienced team that has worked on many projects together.

• Significant relevant project experience, to include Florida Department of Transportationgrant projects

• Thorough analysis of the design, construction parameters and life cycle cost considerations

• Strong project approach

• Consideration and plan for business and residential impacts

• Document and cost controls

• Public engagement plan

• SBE and vendor outreach approach

Brejesh Prayman, Committee Chair Evan Birk, Committee Member

Cheryl Stacks, Committee Member Brian Caper, Committee Member

Mark Laney, Committee Member Michael Gebler, Committee Member

Evan Birk

1

RESOLUTION NO. 2020-___

A RESOLUTION ACKNOWLEDGING THE SELECTION OF

BILTMORE CONSTRUCTION CO., INC. (“BILTMORE”) AS

THE MOST QUALIFIED FIRM TO PROVIDE

PRECONSTRUCTION AND CONSTRUCTION PHASE

SERVICES FOR THE CORRIDOR IMPROVEMENTS ALONG

22ND STREET SOUTH FROM 1ST AVENUE SOUTH TO 11TH

AVENUE SOUTH PROJECT; AUTHORIZING THE MAYOR

OR HIS DESIGNEE TO EXECUTE A CONSTRUCTION

MANAGER AGREEMENT BETWEEN THE CITY OF ST.

PETERSBURG, FLORIDA AND BILTMORE; AUTHORIZING

THE CITY ATTORNEY’S OFFICE TO MAKE NON-

SUBSTANTIVE CHANGES TO THE CONSTRUCTION

MANAGER AGREEMENT; AUTHORIZING PAYMENT TO

BILTMORE IN AN AMOUNT NOT TO EXCEED $50,600 FOR

PRECONSTRUCTION PHASE SERVICES; AND PROVIDING

AN EFFECTIVE DATE.

WHEREAS, the City of St. Petersburg, Florida ("City") through its Procurement

and Supply Management Department issued Request for Qualifications ("RFQ") No. 7619 dated

March 30, 2020 for a Construction Manager for the Corridor Improvements along 22nd Street

South from 1st Avenue South to 11th Avenue South Project (“Project”); and

WHEREAS, the City received two (2) statement of qualifications ("SOQs") in

response to the RFQ; and

WHEREAS, the selection committee (Brejesh Prayman, Cheryl Stacks, Evan

Birk, Brian Caper, Mark Laney, and Michael Gebler) met on May 13, 2020 to discuss the SOQs,

and motioned to shortlist both firms, hear presentations, and conduct interviews on June 18, 2020

with the shortlisted firms; and

WHEREAS, on June 18, 2020, the two shortlisted firms 1) Biltmore Construction

Co., Inc. (“Biltmore”) and 2) LEMA Construction & Developers, Inc. made presentations to the

selection committee; and

WHEREAS, based on the presentations, interviews, deliberations, and SOQs

submitted by the two (2) shortlisted firms, the selection committee ranked Biltmore as the most

qualified firm to provide construction manager services for the Project; and

WHEREAS, Administration recommends City Council acknowledge the selection

of Biltmore as the most qualified firm to provide preconstruction and construction phase services

for the Project and authorize the Mayor or his designee to execute a Construction Manager

Agreement with Biltmore for Biltmore to provide preconstruction and construction phase

services for the Project.

2

NOW THEREFORE BE IT RESOLVED by the City Council of the City of St.

Petersburg, Florida, that the selection of Biltmore Construction Co., Inc. (“Biltmore”) as the

most qualified firm to provide preconstruction and construction phase services for the Corridor

Improvements along 22nd Street South from 1st Avenue South to 11th Avenue South Project is

hereby acknowledged.

BE IT FURTHER RESOLVED that the Mayor or his designee is authorized to

execute a Construction Manager Agreement between the City of St. Petersburg, Florida and

Biltmore.

BE IT FURTHER RESOLVED that the City Attorney’s office is authorized to

make non-substantive changes to the Construction Manager Agreement.

BE IT FURTHER RESOLVED that payment to Biltmore in an amount not to

exceed $50,600 for fees and costs for the preconstruction phase services is hereby approved.

BE IT FURTHER RESOLVED that construction phase services to be performed

by Biltmore is subject to City Council approval.

This resolution shall become effective immediately upon its adoption.

Approved by:

____________________________

City Attorney (Designee) 00524604

Page 1 of 1

-- City of St. Petersburg Authorization Request --

General Authorization

Request #

70646

Name: Pocengal, Nicholas W Request Date: 25-AUG-2020 Status: APPROVED

Authorization Request

Subject: Rev3,CM 22nd StS Corridor Improvements 9/3 Council

Message: Submitted for your approval, please find attached Consent Write-up for Revision 3, CM, 22nd St. S. Corridor Improvements, scheduled to go before City Council on September 3, 2020. Should you have any questions, please contact me at extension 3387. Thank you.

SupportingDocumentation:

958-26 CM 22nd St S Corridor Improvements September 3 2020 - Revised Approval Request.pdf

Approver Completed By Response ResponseDate Type

0 Pocengal, Nicholas W SUBMITTED 25-AUG-2020

1 McKee, Stacey Pevzner McKee, Stacey Pevzner APPROVE 25-AUG-2020 User Defined

2 Tankersley, Claude Duval Tankersley, Claude Duval APPROVE 25-AUG-2020 User Defined

176

The following page(s) contain the backup material for Agenda Item: Approving an agreement

between the City of St. Petersburg and Rowdies Soccer, LLC for the management, maintenance and

operation of Al Lang Stadium with a one-year term commencing on December 1, 2020.

Please scroll down to view the backup material.

CB-5

CB-5

St. Petersburg City Council Meeting of September 3, 2020

Consent Agenda To: The Honorable Ed Montanari, Chair and Members of City Council Subject: Approving an agreement between the City of St. Petersburg and Rowdies Soccer,

LLC for the Management, Maintenance and Operation of Al Lang Stadium with a one-year term commencing on December 1, 2020; and providing an effective date.

BACKGROUND: Rowdies Soccer, LLC (“Rowdies”), are the current managers of Al Lang Stadium under an agreement with the City of St. Petersburg that expires on November 30, 2020. The Rowdies have requested a one-year renewal of their agreement to manage, maintain and operates Al Lang Stadium commencing on December 1, 2020 and ending on November 30, 2021.City Administration desires to continue the current relationship with the Rowdies at Al Lang Stadium and has prepared an agreement for City Council approval. The terms and conditions of the renewal agreement are consistent with the current agreement with the following major modifications:

• Term of Agreement will be for one-year (Dec. 1, 2020 – Nov. 30, 2021). Within the first 5 months of the Term, the Rowdies will notify the City if they desire to negotiate a new agreement with a term of not less than three years to commence on December 1, 2021. As part of the notification, the Rowdies will provide the City any proposed modifications to the existing agreement along with any additional provisions the Rowdies would like the City to consider.

• Exterior Signage – The City shall control all exterior signage at the Stadium except for the marquee sign, which will be controlled by the Rowdies.

RECOMMENDATION: City Administration recommends approval of the attached Resolution approving the agreement between the City and Rowdies for the management, maintenance and operation of Al Lang Stadium with a one-year term commencing on December 1, 2020; and providing an effective date. COST/FUNDING/ASSESSMENT INFORMATION: No City funding is required Approvals: /s/ Alan DeLisle______________ City Development Administration

RESOLUTION NO. 2020-A RESOLUTION APPROVING THE AGREEMENT BETWEENTHE CITY OF ST. PETERSBURG, FLORIDA AND ROWDIESSOCCER, LLC FOR THE MANAGEMENT, MAINTENANCE ANDOPERATION OF AL LANG STADIUM WITH A ONE-YEAR TERMCOMMENCING ON DECEMBER 1, 2020 AND TERMINATING ONNOVEMBER 30, 2021; AUTHORIZING THE CITY ATTORNEY’SOFFICE TO MAKE NON-SUBSTANTIVE CHANGES TO THEAGREEMENT; AUTHORIZING THE MAYOR OR HIS DESIGNEETO EXECUTE THE AGREEMENT; AND PROVIDING ANEFFECTIVE DATE.

WHEREAS, the City of St. Petersburg, Florida (“City”) is the owner of A1 Lang Stadium; and

WHEREAS, the City and Big 3 Entertainment, LLC (“Big 3”) entered into an agreement on October2, 2014 for Big 3 to manage, maintain and operate A1 Lang Stadium (as amended, “Current Agreement”);and

WHEREAS, on October 17, 2018, Rowdies Soccer, LLC (“Operator”) acquired the Tampa BayRowdies, a professional soccer team, and assumed all duties, obligations and liabilities of Big 3 related to theCurrent Agreement; and

WHEREAS, the Current Agreement expires on November 30, 2020; and

WHEREAS, Operator desires to continue to manage, maintain and operate A1 Lang Stadium; and

WHEREAS, the City wishes to enter into a new agreement with Operator for Operator to manage,maintain and operate A1 Lang Stadium until November 30, 2021, except as otherwise provided in the newagreement; and

WHEREAS, Operator has agreed to the terms and conditions set forth in the new agreement.

NOW THEREFORE, BE IT RESOLVED by the City Council of the City of St. Petersburg,Florida, that, the Agreement between the City of St. Petersburg, Florida and Rowdies Soccer, LLC for themanagement, maintenance and operation of A1 Lang Stadium with a one-year term commencing onDecember 1, 2020 and terminating on November 30, 2021 is hereby approved.

BE IT FURTHER RESOLVED that the City Attorney’s Office is authorized to make non-substantive changes to the Agreement.

BE IT FURTHER RESOLVED that the Mayor or his designee is authorized to execute theAgreement.

This Resolution shall become effective immediately upon its adoption.

Approved as to Form and Content:

City Attorney (Designee) 00524015 FINAL

1

AGREEMENT

THIS AGREEMENT (“Agreement”) is made and entered into on the ___ day of

_____________, 2020 (“Execution Date”), by and between Rowdies Soccer, LLC (“Operator”), and

the City of St. Petersburg, Florida (“City”) (collectively, “Parties”).

WITNESSETH:

WHEREAS, the City and Big 3 Entertainment, LLC (“Big 3”) entered into an agreement on

October 2, 2014 for Big 3 to manage, maintain and operate Al Lang Stadium (as amended, “Current

Agreement”); and

WHEREAS, on October 17, 2018, Operator acquired the Tampa Bay Rowdies (“Rowdies”),

a professional soccer team, and assumed all duties, obligations and liabilities of Big 3 related to the

Current Agreement; and

WHEREAS, the Current Agreement expires on November 30, 2020; and

WHEREAS, Operator desires to continue to manage, maintain and operate Al Lang

Stadium; and

WHEREAS, the City wishes to enter into this Agreement with Operator for Operator to

manage, maintain and operate Al Lang Stadium until November 30, 2021, except as otherwise

provided in this Agreement; and

WHEREAS, subject to the terms and conditions set forth in this Agreement, Operator

represents that it possesses the personnel, skills and experience necessary to manage, maintain and

operate Al Lang Stadium.

NOW, THEREFORE, for and in consideration of the foregoing recitals (all of which are

hereby adopted as an integral part of this Agreement), the mutual promises contained herein and

other good and valuable consideration, the receipt and adequacy of which are hereby acknowledged,

the Parties agree as follows:

1. Definitions. For purposes of this Agreement, “Fiscal Year” means that period of time from

October 1 to September 30 each year; “days” means calendar days; and “business days”

means days on which City Hall is open for business.

2. Operator Duties.

A. Operator shall perform the scope of services set forth in Appendix A for the City in

full and complete accordance with this Agreement (“Scope of Services”). The Scope

of Services shall include but not be limited to field maintenance requirements set

forth in Attachment 1 of the Scope of Services, building and facility maintenance set

2

forth in Attachment 2 of the Scope of Services and custodial services set forth in

Attachment 3 of the Scope of Services. Without limiting the generality of the

foregoing, Operator shall provide all labor, supervision, materials, training and

equipment to manage, maintain and operate Al Lang Stadium (“Facility”). The

Facility is the area designated as the Facility in Appendix B and shall include ingress,

egress and approaches thereof and thereto. Operator shall be responsible for all

operational services including but not limited to utilities, phone and data services,

grounds maintenance services, custodial services, elevator maintenance and repairs,

and heating and cooling system maintenance and repairs. Operator shall also be

responsible for all maintenance costs of the Facility. In addition, Operator shall be

responsible for all of the management, staffing, proper handling of the Facility’

funds, fire prevention, energy conservation efforts, marketing, advertising and

financial accounting services.

B. Operator shall cause to be conducted at the Facility, at no cost to the City, a

minimum of ten (10) non-soccer related events per Fiscal Year.

C. Operator shall cooperate with the City in matters related to the Facility that come

before the Pinellas County Tourist Development Council.

D. Operator shall perform all of its duties pursuant to this Agreement at its sole expense

and without any City funding unless otherwise agreed upon by the City in writing

and subject to all required approvals.

3. Term and New Agreement.

A. The term of this Agreement shall commence on December 1, 2020, and terminate on

November 30, 2021 (“Term”), unless this Agreement is earlier terminated pursuant

to this Agreement.

B. On or before May 1, 2021, Operator shall notify the City if its desires to negotiate a

new agreement with a term of not less than three (3) years, commencing on

December 1, 2021. If Operator notifies the City that it desires to negotiate a new

agreement such notification shall include all proposed modifications to the existing

agreement along with any additional provisions Operator would like the City to

consider. If Operator fails to include a proposed modification or additional provision

in such notification, Operator shall be precluded from requesting the proposed

modification or provision at a later date.

4. Indemnification.

3

A. Operator shall defend at its expense, pay on behalf of, hold harmless and indemnify

the City, its officers, employees, agents, elected and appointed officials and

volunteers (collectively, “Indemnified Parties”) from and against any and all claims,

demands, liens, liabilities, penalties, fines, fees, judgments, losses and damages

(collectively, “Claims”), whether or not a lawsuit is filed, including but not limited to

Claims for damage to property or bodily or personal injuries, including death at any

time resulting therefrom, sustained by any persons or entities, and costs, expenses

and attorneys’ and experts’ fees at trial and on appeal, which Claims are alleged or

claimed to have arisen out of or in connection with, in whole or in part, directly or

indirectly:

(1) The performance of this Agreement (including any amendments thereto) by

Operator, its employees, agents, representatives, contractors, subcontractors,

or volunteers; or

(2) The failure of Operator, its employees, agents, representatives, contractors,

subcontractors or volunteers to comply and conform with applicable Laws (as

hereinafter defined); or

(3) Any negligent act or omission of Operator, its employees, agents,

representatives, contractors, subcontractors, or volunteers, whether or not

such negligence is claimed to be either solely that of Operator, its employees,

agents, representatives, contractors, subcontractors, or volunteers or to be in

conjunction with the claimed negligence of others, including that of any of

the Indemnified Parties; or

(4) Any reckless or intentional wrongful act or omission of Operator, its

employees, agents, representatives, contractors, subcontractors or volunteers.

B. Without limiting the generality of the foregoing, Operator specifically acknowledges

that the indemnity undertaking herein shall apply to Claims in connection with or

arising out of the transportation, use, storage, maintenance, generation,

manufacturing, handling, disposal, release or discharge of any Hazardous Material

(as hereinafter defined) by Operator, its employees, agents, representatives,

contractors, subcontractors, or volunteers and Claims in connection with or arising

out of any violation of Paragraph 48; provided, however that Operator’s obligations

pursuant to this Paragraph 4.B. shall not apply to any other Claims related to

environmental contamination.

C. Operator shall not be responsible for Claims caused by the sole negligence of the

City.

D. The provisions of this paragraph are independent of, and will not be limited by, any

insurance required to be obtained by Operator pursuant to this Agreement or

4

otherwise obtained by Operator, and shall survive termination of this Agreement with

respect to any claims or liability arising in connection with any event occurring prior

to termination of this Agreement.

5. Insurance.

A. Operator shall carry the following minimum types and amounts of insurance at its

own expense:

(1) Commercial general liability insurance in an amount of at least One Million

Dollars ($1,000,000) per occurrence, Two Million Dollars ($2,000,000)

aggregate in occurrences form. This policy shall include coverage for (i)

personal injury or death or property damage or destruction; (ii) business

interruption; (iii) fire legal liability in the minimum amount of One Hundred

Thousand Dollars ($100,000); and (iv) contractual liability under this

Agreement.

(2) Automobile liability insurance of $1,000,000 combined single limit covering

all owned, hired and non-owned vehicles.

(3) Workers’ Compensation insurance as required by Florida law and

Employers’ Liability insurance in an amount of at least $500,000 each

accident, $500,000 per employee, and $500,000 for all diseases.

(4) Liquor Liability Insurance in the amount of One Million Dollars

($1,000,000).

B. All of Operator’s insurance policies, except Workers’ Compensation shall name the

Indemnified Parties as additional insureds.

C. All policies shall provide that the City will be provided notice at least thirty (30) days

prior to any cancellation, reduction or material change in coverage.

D. Operator shall provide the City with Certificates of Insurance on a standard ACORD

form, or similar form acceptable to the City, reflecting all required coverage. At the

City’s request, Operator shall provide copies of current policies with all applicable

endorsements.

E. All insurance required shall be on a primary and noncontributory basis and shall be

provided by responsible insurers licensed in the State of Florida and rated at least A-

in the then current edition of AM Best’s Rating Services, or similar rating agency

acceptable to the City.

F. If the insurance carried by the Operator has broader coverage than required in this

5

Agreement, then that broader coverage, including but not limited to additional

insured requirements, shall be the requirement in this Agreement. If the Operator’s

insurance limits are greater than the minimum limits set forth herein, then the

Operator’s insurance limits shall be the required limits in this Agreement.

G. Operator hereby waives all subrogation rights of its insurance carriers in favor of the

Indemnified Parties. This provision is intended to waive fully, and for the benefit of

the Indemnified Parties, any rights or claims which might give rise to a right of

subrogation in favor of any insurance carrier.

H. The City shall have the right to reasonably increase the amount or expand the scope

of insurance to be maintained by Operator hereunder from time to time.

6. Condition of Facility. Operator has inspected the Facility and accepts the condition of the

Facility in an "as is" condition. By virtue of such inspection, Operator is satisfied that the

Facility is safe and acceptable for the permitted uses set forth in this Agreement. The City

has made no representations, statements, or warranties, either expressed or implied, as to the

condition of the Facility, or as to its fitness for a particular use. The Indemnified Parties

shall not be responsible or liable at any time for (i) any defects, latent or otherwise, in the

Facility or any building or improvements therein or in any of the equipment, machinery,

utilities, appliances or apparatus therein, or (ii) for any loss of life, or injury or damage to

any person or to any property or business of Operator or those claiming by, through or under

Operator, regardless of the cause.

7. Return of Facility Upon Termination. Operator shall, on or before termination of this

Agreement, remove all goods and effects of Operator, repair any damage caused by such

removal and surrender and deliver up the Facility, broom clean and in good order, condition

and repair, ordinary wear and tear excepted. Any property not removed within twenty-four

(24) hours after termination of this Agreement shall be deemed to have been abandoned by

Operator, and may be retained or disposed of by the City, as the City shall desire.

8. Permitted Uses.

A. The Facility shall be occupied, maintained, and used by Operator for the primary

purpose of providing the home field for the Rowdies and for other sports, leagues,

teams, tournaments, camps, clinics, lessons, practices, games, strength and

conditioning, rehabilitation and training, sports related retail sales, and schools for

umpires, coaches, players and agronomy.

B. The Facility may also be used for other events that will not materially damage the

playing field surfaces including but not be limited to concerts, festivals and

graduations; provided, however, that Operator must receive the City’s prior written

approval of a noise management plan for any event at the Facility with amplified

music. Operator must submit a proposed noise management plan to the City at least

6

two (2) weeks prior to any event at the Facility with amplified music. Such proposed

noise management plan shall include (at a minimum): (i) start and end times of the

event; (ii) the direction of the speakers; and (iii) and any other relevant information

regarding noise management. No later than three (3) business days after receiving

Operator’s written request for approval of a proposed noise management plan, the

City will provide a response either approving the plan, approving the plan subject to

modifications or conditions, or rejecting the plan. Operator may send written requests

for City approval of a proposed noise management plan via email to the director of

City Development Administration.

C. Operator shall not use or allow the use of the Facility except as permitted above,

unless otherwise agreed upon by the City in writing.

9. Substantial Damage. If the Facility is damaged substantially by fire, flood or other cause so

as to render the Facility untenable as determined by the City in its sole and absolute

discretion, either party may terminate this Agreement upon thirty (30) days prior written

notice to the other party.

10. Right of Entry. The City shall have the right (twenty-four (24) hours a day, seven (7) days

a week) to enter and inspect the Facility.

11. Clean-up, Facility Maintenance and Equipment Maintenance.

A. During performance of any work at the Facility and upon completion of the work,

Operator shall clean and remove from the work site all surplus and discarded

materials, rubbish, and temporary structures, and shall restore in an acceptable

manner all property, both public and private, including property that was damaged or

destroyed, and shall leave the work site in a neat and presentable condition.

B. Operator shall keep the Facility neat and clean and clear of all rubbish and non-

essential items.

12. Notices. Unless and to the extent otherwise provided in this Agreement, all notices,

demands, requests for approvals and other communications which are required to be given

by either party to the other shall be in writing and shall be deemed given and delivered on the

date delivered in person, upon the expiration of five (5) days following the date mailed by

registered or certified mail, postage prepaid, return receipt requested to the address provided

below, or upon the date delivered by overnight courier (signature required) to the address

provided below.

CITY:

7

City of St. Petersburg

175 5th Street North

St. Petersburg, FL 33701

Attn: City Development Administration

Phone: 727-892-5400

ROWDIES:

Rowdies Soccer, LLC

One Tropicana Drive

St. Petersburg, FL 33705

Attention: John P. Higgins

Senior Vice President of Administration

General Counsel

13. Severability. Should any paragraph or portion of any paragraph of this Agreement be

rendered void, invalid or unenforceable by any court of law for any reason, such

determination shall not render void, invalid or unenforceable any other paragraph or portion

of this Agreement.

14. Due Authority. Each party to this Agreement represents and warrants to the other party that

(i) it is a duly organized, qualified and existing entity authorized to do business under the

laws of the State of Florida, and (ii) all appropriate authority exists so as to duly authorize

the person executing this Agreement to so execute the same and fully bind the party on

whose behalf he or she is executing.

15. Assignment. Operator shall make no assignment of any of its rights, duties, or obligations

under this Agreement without City Council’s prior written approval, which approval may be

withheld by City Council in its sole and absolute discretion.

16. City Termination.

A. In addition to the City’s other rights to terminate this Agreement, the City may

terminate this Agreement upon written notice to Operator in the event Operator

defaults on any of the terms or conditions of this Agreement and such default

continues for a period of thirty (30) days following notice from the City specifying

the default.

B. If the City determines that Operator has failed to comply with Paragraph 51, the City

shall provide Operator with notice of such default and Operator shall have five (5)

days to cure such default in a manner determined to be acceptable by the City in its

sole and absolute discretion, otherwise the City may terminate this Agreement at the

conclusion of such five (5) day cure period.

8

C. The City may terminate this Agreement upon written notice to Operator in the event

the Rowdies are no longer a member of the North American Soccer League, United

Soccer League or Major League Soccer, or if the Operator voluntarily relocate any

Rowdies home game from the Facility without the City’s prior written approval,

unless such relocation is temporary and due to circumstances beyond the control of

Operator.

D. The City may terminate this Agreement as provided in Florida Statute section

287.135.

17. Operator Termination. In addition to Operator’s other rights to terminate this Agreement,

Operator may terminate this Agreement: (i) upon written notice to the City in the event the

City defaults on any of the terms or conditions of this Agreement and such failure continues

for a period of thirty (30) days following notice from Operator specifying the default, or (ii)

if Operator’s tax liability under Paragraph 46 exceeds one hundred thousand dollars

($100,000.00) in any calendar year; provided, however, that Operator shall remain obligated

to pay its portion of any such tax liability already assessed for the year in which such

termination occurs.

18. Governing Law and Venue. This Agreement shall be interpreted and construed in

accordance with the laws of the State of Florida and shall inure to and be binding upon the

Parties, their successors and assigns. Venue for any action brought in state court shall be in

Pinellas County, St. Petersburg Division. Venue for any action brought in federal court shall

be in the Middle District of Florida, Tampa Division, unless a division shall be created in St.

Petersburg or Pinellas County, in which case the action shall be brought in that division. The

Parties consent to the personal jurisdiction of the aforementioned courts and irrevocably

waive any objections to said jurisdiction.

19. Contract Adjustments.

A. Either party may propose additions, deletions or modifications to the Scope of

Services (“Contract Adjustments”) in whatever manner such party determines to be

reasonably necessary for the proper completion of the services. Proposals for

Contract Adjustments shall be submitted to the non-requesting party on a form

provided by the City. Contract Adjustments shall be effected through written

amendments to this Agreement, signed by authorized representatives of the Parties.

B. In the event Operator proposes a Contract Adjustment and the City does not approve

such Contract Adjustment, Operator will continue to perform the original Scope of

Services in accordance with the terms and conditions of this Agreement.

20. Amendment. This Agreement may be amended only in writing executed by the Parties.

9

21. Entire Agreement. This Agreement constitutes the entire agreement between the Parties

related to the subject matter hereof and supersedes all prior and contemporaneous

agreements, whether oral or written, between them.

22. Compliance with Laws. Operator shall comply with all applicable federal, state, and local

laws, ordinances, rules and regulations, the federal and state constitutions, and orders and

decrees of any lawful authorities having jurisdiction over the matter at issue (collectively,

“Laws”), including but not limited to Florida Public Records Law (e.g., Chapter 119, Florida

Statutes). Operator hereby makes all certifications required under Florida Statute section

287.135. Operator also acknowledges that there are Laws applicable to the construction of

public buildings and repairs upon public works, including but not limited to Laws requiring

execution and delivery of a performance and payment bond (e.g., Section 255.05, Florida

Statutes).

23. Third Party Beneficiary. No persons other than Operator and the City and their successors

and assigns shall have any rights whatsoever under this Agreement.

24. No Liens. Operator shall not suffer any liens to be filed against the Facility or any other

City property by reason of any work, labor, services or materials performed at or furnished to

the Facility or any other City property, to Operator, or to anyone using the Facility or any

other City property through or under Operator. Nothing contained in this Agreement shall be

construed as a consent on the part of the City to subject the Facility or any other City

property or any part thereof to any lien or liability under any Laws.

25. No Construction Against Preparer of Agreement. This Agreement has been prepared by

the City and reviewed by Operator and its professional advisors. The City, Operator and

Operator’s professional advisors believe that this Agreement expresses their agreement and

that it should not be interpreted in favor of either the City or Operator or against the City or

Operator merely because of their efforts in preparing it.

26. Non-appropriation. The obligations of the City as to any funding required pursuant to this

Agreement shall be limited to an obligation in any given year to budget, appropriate and pay

from legally available funds, after monies for essential City services have been budgeted and

appropriated, sufficient monies for the funding that is required during that year.

Notwithstanding the foregoing, the City shall not be prohibited from pledging any legally

available non-ad valorem revenues for any obligations heretofore or hereafter incurred,

which pledge shall be prior and superior to any obligation of the City pursuant to this

Agreement.

27. City Consent and Action.

A. For purposes of this Agreement, any required written permission, consent, acceptance,

approval, or agreement by the City means the approval of the Mayor or his authorized

10

designee, unless otherwise set forth in this Agreement or unless otherwise required to

be exercised by City Council pursuant to the City Charter or applicable Laws.

B. For purposes of this Agreement, any right of the City to take any action permitted,

allowed, or required by this Agreement may be exercised by the Mayor or his

authorized designee, unless otherwise set forth in this Agreement or unless otherwise

required to be exercised by City Council pursuant to the City Charter or applicable

Laws.

28. Captions. Captions are for convenience only and shall not control or affect the meaning or

construction of any of the provisions of this Agreement.

29. Books and Records. Operator shall prepare in accordance with generally accepted

accounting practice and shall keep, at the address for delivery of notices set forth in this

Agreement, accurate books of account. All books and records, including tax returns, with

respect to Operator managing, maintaining and operating the Facility pursuant to this

Agreement shall be kept by Operator and shall be open to examination or audit by the City

during the Term and for the retention periods set forth in the most recent General Records

Schedule GS1-SL for State and Local Government Agencies. Nothing herein shall be

construed to allow destruction of records that may be required to be retained longer by the

statutes of the State of Florida.

30. Survival. All obligations and rights of any party arising during or attributable to the period

prior to termination of this Agreement, including but not limited to those obligations and

rights related to indemnification, shall survive termination of this Agreement.

31. Force Majeure. In the event that either party hereto shall be delayed or hindered in or

prevented from the performance required hereunder by reason of strikes, lockouts, labor

troubles, failure of power, riots, insurrection, war, acts of God, public health emergencies, or

other reason of like nature not the fault of the party delayed in performing work or doing acts

(“Permitted Delay”), such party shall be excused for the period of time equivalent to the

delay caused by such Permitted Delay. Notwithstanding the foregoing, any extension of time

for a Permitted Delay shall be conditioned upon the party seeking an extension of time

delivering written notice of such Permitted Delay to the other party within ten (10) days of

the event causing the Permitted Delay.

32. No Waiver. No provision of this Agreement will be deemed waived by either party unless

expressly waived in writing signed by the waiving party. No waiver shall be implied by

delay or any other act or omission of either party. No waiver by either party of any provision

of this Agreement shall be deemed a waiver of such provision with respect to any subsequent

matter relating to such provision, and the City’s consent respecting any action by Operator

shall not constitute a waiver of the requirement for obtaining the City’s consent respecting

any subsequent action.

11

33. Permits and Licenses. Operator shall be responsible for obtaining any and all necessary

permits, licenses, certifications and approvals which may be required by any government

agency in connection with Operator’s performance of this Agreement. Upon request of the

City, Operator shall provide the City with written evidence of such permits, licenses,

certifications and approvals.

34. Successors and Assigns. This Agreement shall inure to the benefit of and be enforceable by

and against the Parties, their heirs, personal representatives, successors, and assigns,

including successors by way of reorganization.

35. Subcontract. The hiring or use of subcontractors in connection with the performance of

Operator’s obligations under this Agreement is permitted. Operator shall be solely

responsible for ensuring that any subcontractor retained by Operator acts in a manner

consistent with and in accordance with the terms and conditions of this Agreement. Operator

shall promptly pay all subcontractors and suppliers. In no event shall Operator’s retention of

a subcontractor relieve Operator of any of its duties, obligations or representations under this

Agreement. Operator shall require all subcontractors to defend and indemnify the

Indemnified Parties to the same extent as Operator and name the Indemnified Parties as

additional insureds under all insurance policies which Operator requires to be obtained.

36. Relationship of Parties. Nothing contained herein shall be deemed or construed by the

Parties, or by any third party, as creating the relationship of principal and agent or of

partnership or of joint venture between the Parties, it being understood and agreed that

nothing contained herein, nor any acts of the Parties, shall be deemed to create any

relationship between the Parties other than the relationship of independent contractors and

principals of their own accounts.

37. Signage.

A. All signage at the Facility must comply with applicable Laws, including the City’s

sign code.

B. Operator shall control the interior signage at the Facility and retain all revenue

generated from the interior signage; provided, however, that (i) the City shall have

the right to place signage on one half of the outfield wall sign areas at the Facility,

(ii) allocation of outfield wall signage locations at the Facility shall be mutually

agreed upon by Operator and the City, (iii) the City shall have the right to retain all

revenue related to the placement of signage on the City’s half of the outfield signage

locations at the Facility, and (iv) the City shall have the right to display temporary

interior signage at the Facility to promote City and community events as mutually

agreed upon by the Parties.

C. Except for the exterior marquee sign, the City shall control all exterior signage at the

Facility and retain all revenue generated from the exterior signage.

12

38. Naming Rights. Unless otherwise approved by City Council, the name “Al Lang” shall be

included in the name of the Facility or in the name of the field at the Facility. Subject to the

foregoing, the City shall have the right, at its expense, to rename or sell the name of the

Facility. Any net naming rights proceeds less selling expenses and/or commissions up to one

hundred thousand dollars ($100,000) per Fiscal Year shall be shared as follows: eighty

percent (80%) to the City and twenty percent (20%) to Operator. Any net naming rights

proceeds less selling expenses and/or commissions in excess of one hundred thousand dollars

($100,000) per Fiscal Year shall be shared as follows: twenty percent (20%) to the City on

the amount that exceeds one hundred thousand dollars ($100,000) and eighty percent (80%)

to Operator on the amount that exceeds one hundred thousand dollars ($100,000). For

example, if the net naming rights proceeds less selling expenses and/or commissions are

$125,000 for Fiscal Year 2021, the City would retain eighty percent (80%) of $100,000 and

twenty percent (20%) on the remaining amount of $25,000 and Operator would receive

twenty percent (20%) of $100,000 and eighty percent (80%) on the remaining amount of

$25,000. Any naming rights proceeds due to Operator pursuant to this Agreement shall be

paid by the City to Operator within ten (10) days of receipt of the gross naming rights

proceeds received by the City from the naming rights sponsor.

39. Non-Discrimination. Operator shall not discriminate against anyone in the use of the

Facility because of race, color, religion, gender, national origin, marital status, age,

disability, sexual orientation, genetic information or other protected category.

40. Appendices. Each appendix to this Agreement, including all attachments to each appendix,

is an essential part hereof and is incorporated herein by reference.

41. Grand Prix Race Agreement and Grand Prix Race Event; Saturday Morning Market.

A. Grand Prix Race Agreement: This Agreement is subject to current and future

agreements with third parties for the conduct of racing events in downtown St.

Petersburg (any such agreement hereinafter referred to as “Grand Prix Race

Agreement”) and all rights (exclusive rights and other rights) and authority granted

thereunder, including but not limited to rights related to use of the Facility. Without

limiting the generality of the foregoing, Operator acknowledges and agrees that (i)

the Facility and Operator’s business operations will be impacted by Race Events and

other activities that will occur before, during and after Race Events (e.g.,

construction, set-up and tear down activities), and (ii) that the Facility will be closed

to the general public for certain periods of time in connection with Race Events

(although ticket holders for Race Events may have access to the Facility). In the

event of a conflict or ambiguity between this Agreement and any Grand Prix Race

Agreement, the Grand Prix Race Agreement shall prevail. As used herein, the terms

“Race Event,” “Race Area,” “Race Promoter” and “Race Period” shall have the

meanings set forth in the Grand Prix Race Agreement.

13

B. Grand Prix Race Event: In the absence of a written agreement between Operator and

Race Promoter which specifically provides otherwise, Operator shall comply with

the following regulations pertaining to the Facility during Race Events, and such

other regulations as may be imposed by the City from time to time:

(1) Temporary outdoor uses are prohibited.

(2) All uses, including but not limited to retail and food uses, operating from

temporary or portable structures or vehicles such as semi-trailers, step vans,

recreational or other vehicles with cooking facility, are prohibited.

(3) Sale or distribution of food or any other item outside the interior premises is

prohibited.

(4) Temporary structures, including tents, shall not be erected and are prohibited.

(5) Temporary signs, including signs on vehicles and buildings, visible from a

street right-of-way and/or the Race Area are prohibited. Any sign erected

shall be a permanent sign which has received the required permits.

(6) Streamers, pennants, banners and inflatables, located within the Facility,

which are visible from any street right-of-way and/or the Race Area, are

prohibited.

C. Saturday Morning Market: This Agreement is subject to current and future

agreements with third parties for the conduct of a Saturday Morning Market in the Al

Lang Parking Lot (any such agreement hereinafter referred to as “Saturday Morning

Market Agreement”) and all rights (exclusive rights and other rights) and authority

granted thereunder, including but not limited to rights related to use of the Al Lang

Parking Lot. For purposes of this Agreement, Al Lang Parking Lot shall mean the

area designated by the City as the Al Lang Parking Lot. Following the Execution

Date, the City shall not enter into any Saturday Morning Market Agreement that

grants any third party use of the Al Lang Parking Lot after 4:00 pm on any Saturday.

42. Al Lang Parking Lot.

A. The City or its third party manager shall manage and operate all parking at the Al

Lang Parking Lot during the Term. The City will retain all gross sales and profits

from parking operations except for net profits related to parking for any Al Lang

Event, which net profits shall be remitted by the City to Operator subject to and in

accordance with this Paragraph 42. For purposes of this Paragraph 42, an Al Lang

Event is defined as a public event within the field area of the Facility occurring after

6 p.m. on weekdays or on weekends or holidays.

14

B. Operator shall notify the City of each Al Lang Event no later than sixty (60) days

prior to the event (or such shorter period of time agreed upon by the City). Subject to

Paragraph 41, the City shall not enter into any agreement for use of the Al Lang

Parking Lot during an Al Lang Event without the written approval of Operator,

which approval shall not be unreasonably withheld. In the event that the City desires

to use the Al Lang Parking Lot on a date for which the City has not received notice

of an Al Lang Event, the City will provide Operator with notice of the date

requested. No later than five (5) business days after receiving such request from the

City, Operator shall advise the City if such date will conflict with a tentative Al Lang

Event that has not yet been scheduled. If Operator advises that such date does not

conflict with a tentative Al Lang Event, the City shall have reserved use of the Al

Lang Parking Lot for such date and Operator shall have no right to cancel the City’s

use of the Al Lang Parking Lot on such date. If Operator advises that such date does

conflict with a tentative Al Lang Event, the City and Operator shall schedule a

meeting to discuss the conflict.

C. At least one (1) week prior to any Al Lang Event, Operator shall submit to the City a

proposed Al Lang Event parking plan. Such parking plan shall include (at a

minimum): (i) the requested amount of staffing; (ii) number of hours the Al Lang

Parking Lot should be staffed; (iii) start and end times of the Al Lang Event; (iv)

allocation of the parking areas by user (e.g., Operator’s staff, VIP, Rowdies’ season

ticket holders, and general public); and (v) proposed parking rates. No later than

three (3) business days after receiving Operator’s written request for approval of such

proposed Al Lang Event parking plan, the City will provide a response either

approving the plan, approving the plan subject to modifications or conditions, or

rejecting the plan. Operator may submit a proposed Al Lang Event parking plan to

be used for a reoccurring Al Lang Event (i.e., Rowdies home games). Any approved

Al Lang Event parking plan (whether approved as submitted or approved subject to

modifications or conditions) shall be implemented by the City or its third party

manager. Operator agrees to cooperate with the City or its third party manager to

address any issues related to an Al Lang Event parking plan that arise during an Al

Lang Event (e.g., less space due to vehicles remaining in the Al Lang Parking Lot

after 6 p.m. that are permitted pursuant to a monthly parking agreement). Within

forty-five (45) days after an Al Lang Event, the City will remit to Operator the net

profit, if any, from parking pursuant to an Al Lang Event parking plan. Net profit

shall be gross sales less any reasonable parking expenses directly associated with the

Al Lang Event. Should there be a net loss from parking pursuant to an Al Lang Event

parking plan, the City shall invoice Operator for this amount. Operator shall remit to

the City the amount of the net loss within thirty (30) days of the invoice date. The

City shall retain records for the parking expenses charged to Operator pursuant to

this Paragraph 42 (which records shall describe such expenses), permit Operator

access to such records, and provide Operator with a list of such parking expenses

along with the remitted net profit from parking pursuant to an Al Lang Event.

15

D. Subject to Paragraph 41, the City will provide Operator up to twelve (12) reserved

parking spaces in the Al Lang Parking Lot for Operator’s use at no cost to Operator;

provided, however, that the City shall have the right to immediate access and use of

the Al Lang Parking Lot (with no guarantee of any reserved parking spaces) at any

time upon verbal notice to Operator.

E. If Operator desires to use the Al Lang Parking Lot for any activity or purpose other

than parking for an Al Lang Event pursuant to an Al Lang Event parking plan,

Operator shall obtain prior written approval from the City. If approved by the City,

Operator shall execute all documents required by the City or its third party manager

and shall name the City and its third party manager as additional insureds on all

required policies of insurance.

F. For purposes of this Paragraph 42, the City and Operator may send written notices

and written requests via email to the individuals designated by the City and Operator

for such purpose.

43. Capital Improvements.

A. Capital Improvements shall mean repairs, renewals, and replacements of the Facility

buildings, structures, equipment or fixtures which have an expected useful life

greater than three (3) years. Capital Improvements include but are not limited to

buildings; appurtenances (e.g., fences, roofs, walls and bleachers); heating,

ventilation, air conditioning, mechanical, electrical and plumbing systems; elevators;

irrigation; and field turf. All other improvements and repairs shall be considered

operations and maintenance.

B. Operator shall not make any Capital Improvements without, in each case, first

obtaining the prior written approval of the City. All Capital Improvements shall

immediately become the property of the City.

C. The City shall have no obligation to fund any Capital Improvements.

D. Without limiting the generality of the foregoing and notwithstanding anything to the

contrary contained in this Agreement, Operator acknowledges and agrees that (i) any

person or entity that Operator retains, contracts with or utilizes in connection with

making Capital Improvements shall be considered a subcontractor of Operator under

this Agreement; (ii) Operator shall comply or cause its subcontractors to comply with

all Laws applicable to the design and construction of Capital Improvements,

including but not limited to Title II of the Americans with Disabilities Act, building

codes and fire codes; and (iii) Operator shall comply or cause its subcontractors to

comply with Laws related to public buildings and public works (e.g., Section 255.05,

Florida Statutes) in making Capital Improvements.

16

44. Security. Operator shall be responsible for all security for the Facility and events held at the

Facility.

45. Access to Facility by Operator. The City shall maintain Operator’s ingress and egress to

and from the Facility uninterrupted at the level presently provided, except as otherwise set

forth in this Agreement. The present level of ingress and egress recognizes the fact that there

are at times temporary suspension of ingress and egress for construction projects or City co-

sponsored or authorized special events, including but not limited to the Grand Prix Race

Event, other racing events and the Saturday Morning Market. The number and duration of

such interruptions shall be determined by the City in its sole and absolute discretion.

46. Taxes. Operator shall pay all taxes associated with the use and operation of the Facility,

including but not limited to ad valorem taxes, except for: (a) subject to Paragraph 46(c)

below, the City shall pay that portion of the ad valorem taxes levied by the City on the land

and structures constituting the Facility; (b) subject to Paragraph 46(c) below, the City shall

pay that portion of the ad valorem taxes levied by Pinellas County on the building and

structure constituting the Facility which represents the tax increment portion payable to the

City of St. Petersburg Community Redevelopment Agency pursuant to Chapter 163, Florida

Statutes, by virtue of the Intown Redevelopment Plan; and (c) notwithstanding Paragraph

46(a) or Paragraph 46(b) above, the City shall not pay taxes pursuant to Paragraph 46(a) or

Paragraph 46(b) above for any portion of the Facility that is used for Operator’s business

operations (e.g., concessions). The Parties agree to cooperate in communicating with the

Pinellas County Property Appraiser to minimize any increase in ad valorem taxes payable for

the Facility.

47. City’s Use of the Facility. The City may reserve for its own use up to four (4) dates at the

Facility each Fiscal Year for events and activities to be sponsored by the City (“City Use

Dates”), not including the Grand Prix Race Event. These City Use Dates will be provided

rent free to the City; provided, however, that the City shall reimburse Operator for any direct

out-of-pocket expenses incurred in connection with such City Use Dates (not including

expenses already incurred by Operator in connection with the daily operation of the Facility,

e.g. ordinary utilities). During each Fiscal Year, the City will provide notice of dates

requested to Operator and Operator shall use its best efforts to schedule its use of the Facility

so as to not interfere with the City’s requested dates. Once a City Use Date is reserved by

Operator, Operator shall not cancel such City Use Date.

48. Hazardous Materials.

A. Operator shall not transport, use, store, maintain, generate, manufacture, handle,

dispose, release or discharge any Hazardous Material (as hereinafter defined) or

permit any of Operator’s employees, agents, representatives, contractors,

subcontractors or volunteers to engage in such activities. However, the foregoing

shall not prohibit the transportation to and from, and use, storage, maintenance and

handling within the Facility of substances customarily used in the management,

17

maintenance and operation of the Facility, provided: (a) such substances shall be

used and maintained only in such quantities as are reasonably necessary for the

management and operation of the Facility, strictly in accordance with applicable

Laws, highest prevailing standards, and the manufacturers’ instructions therefor; (b)

such substances shall not be disposed of, released or discharged at the Facility, and

shall be transported to and from the Facility in compliance with all applicable Laws;

(c) if any applicable Laws or the City’s trash removal provider requires that any such

substances be disposed of separately from ordinary trash, Operator shall make

arrangements at Operator’s expense for such disposal directly with a qualified and

licensed disposal company at a lawful disposal site; (d) any such substances shall be

completely, properly and lawfully removed from the Facility upon termination of this

Agreement; and (e) for purposes of removal and disposal of any such substances,

Operator shall be named as the owner and generator, obtain a waste generator

identification number, and execute all permit applications, manifests, waste

characterization documents and any other required forms. The term “Hazardous

Material” shall mean any chemical, substance, material or waste or component

thereof which is now or hereafter listed, defined or regulated as a hazardous or toxic

chemical, substance, material or waste or component thereof by any federal, state or

local governing or regulatory body having jurisdiction, or which would trigger any

employee or community Aright-to-know@ requirements adopted by any such body,

or for which any such body has adopted any requirements for the preparation or

distribution of a material safety data sheet (“MSDS”).

B. Operator shall immediately notify the City of: (i) any enforcement, cleanup or other

regulatory action taken or threatened by any governmental or regulatory authority

with respect to the presence of any Hazardous Material at the Facility or the

migration thereof from or to other property, (ii) any demands or claims made or

threatened by any party relating to any loss or injury resulting from any Hazardous

Material at the Facility, (iii) any release, discharge or improper or unlawful disposal

or transportation of any Hazardous Material on or from the Facility or in violation of

this paragraph, and (iv) any matters where Operator is required by applicable Laws to

give a notice to any governmental or regulatory authority respecting any Hazardous

Material at the Facility. At such times as the City may request, Operator shall

provide the City with a written list, certified to be true and complete, identifying any

Hazardous Material then used, stored, or maintained upon the Facility, the use and

approximate quantity of each such material, a copy of any MSDS issued by the

manufacturer therefor, and such other information as the City may require or as may

be required by applicable Laws.

C. If any Hazardous Material is released, discharged or disposed of by Operator or its

employees, agents, representatives, contractors, subcontractors or volunteers in

violation of this paragraph, Contactor shall immediately, properly and in compliance

with applicable Laws notify the proper authorities, notify the City, cleanup and

remove the Hazardous Material from the Facility and any other affected property and

18

clean or replace any affected personal property (whether or not owned by the City),

at Operator’s expense (without limiting the City’s other remedies therefor). Such

cleanup and removal work shall be subject to the City’s prior written approval

(except in emergencies) and shall include, without limitation, any testing,

investigation, preparation and implementation of any remedial action plan required

by any court or governmental body having jurisdiction or required by the City. In the

event the City elects in its sole discretion to have any testing, investigation and/or

cleanup (including but not limited to preparation and implementation of a remedial

action plan) performed by a City provider (or providers), Operator shall cooperate

with the provider(s) performing such testing, investigation and/or cleanup as directed

by the provider(s) and the City, and if such testing or investigation shows that

Operator has violated this paragraph, Operator shall promptly pay the provider(s) the

total amount charged by the provider(s) in connection with the testing, investigation

and cleanup. Nothing contained in this paragraph shall limit or otherwise affect

Operator’s indemnity obligations set forth in this Agreement.

49. Use Agreements.

A. All use agreements shall be entered into between Operator (in its own name) and the

user.

B. Operator shall be responsible for negotiating the terms and conditions of all use

agreements, provided that such terms and conditions are consistent with this

Agreement, and further provided that Operator shall ensure that all use agreements

require the user to (i) name the Indemnified Parties as additional insured on all

insurance required to be obtained by user pursuant to the use agreement, and (ii)

defend and indemnify the Indemnified Parties against any and all claims related to

user’s use of the Facility.

C. All use agreements for publicly ticketed events shall contain a provision requiring the

user to provide ten (10) tickets to the City for the event, at no cost to the City, for the

promotion and development of the City, but not for resale. In addition, Operator

shall provide the City ten (10) tickets to all Rowdies home games, including any

playoff games played at the Facility, at no cost to the City, for the promotion and

development of the City, but not for resale. The City will inform Operator if the City

requires less than ten (10) tickets for an event.

50. No Right to Pledge, Encumber or Cause the City to Assume Liability. Operator shall

have no right or authority to pledge or encumber the credit of the City. Operator shall have

no right or authority to cause the City to assume liability for any contract, lease, purchase or

other agreement without Approval.

51. Non-Disparagement. No Covered Person shall disparage the condition of the Facility. For

purposes of this paragraph, “disparage” means to make any negative statement, whether

19

orally or in written or electronic form, and “Covered Person” means Operator or any

member, manager, or officer of Operator. Notwithstanding the foregoing, internal business

discussions among Covered Persons and statements required to be made pursuant to legal

process (e.g., pursuant to court order or subpoena), shall not constitute a violation of this

paragraph.

52. Public Records.

A. Operator shall (i) keep and maintain public records (as defined in Florida’s Public

Records law) required by the City to perform the services pursuant to this

Agreement; (ii) upon request from the City Clerk’s Office, provide the City (at no

cost to the City) with a copy of the requested records or allow the records to be

inspected or copied within a reasonable time at a cost that does not exceed the cost

provided under Florida’s Public Records law or other applicable Laws; (iii) ensure

that public records in Operator’s possession that are exempt or confidential and

exempt from public records disclosure requirements are not disclosed except as

authorized by applicable Laws for the Term and after the expiration or earlier

termination of this Agreement; and (iv) after the expiration or earlier termination of

this Agreement, at the City’s request, either transfer, at no cost, to the City all

public records in Operator’s possession within ten (10) days following the City’s

request and/or keep and maintain any public records required by the City to

perform the services pursuant to this Agreement. If Operator transfers all public

records to the City upon the expiration or earlier termination of this Agreement,

Operator shall destroy any duplicate public records that are exempt or confidential

and exempt from public records disclosure requirements. If Operator keeps and

maintains public records upon the expiration or earlier termination of this

Agreement, Operator shall meet all applicable requirements for retaining public

records in accordance with this Agreement and all applicable Laws. At the City’s

request, all public records stored electronically by Operator shall be provided to the

City in a format approved by the City.

B. IF OPERATOR HAS QUESTIONS REGARDING THE

APPLICATION OF CHAPTER 119, FLORIDA STATUTES, AS

TO OPERATOR’S DUTY TO PROVIDE PUBLIC RECORDS

RELATING TO THIS AGREEMENT, CONTACT THE CITY

CLERK’S OFFICE (THE CUSTODIAN OF PUBLIC RECORDS)

AT (727) 893-7448, [email protected], OR 175

FIFTH ST. N., ST. PETERSBURG FL 33701.

C. Nothing contained herein shall be construed to affect or limit Operator’s

obligations including but not limited to Operator’s obligations to comply with all

other applicable Laws and to maintain books and records pursuant to this

Agreement.

20

REMAINING PORTION INTENTIONALLY LEFT BLANK

IN WITNESS WHEREOF the Parties have caused this Agreement to be executed by their

duly authorized representatives on the day and date first above written.

ROWDIES SOCCER, LLC: WITNESSES

By: Sign:_________________________

Print:_________________________ Print:_________________________

Title:__________________________

Sign:_________________________

Print:_________________________

CITY OF ST. PETERSBURG, FLORIDA

By: ___________________________________

Print: _________________________________

Title: __________________________________

ATTEST:

(SEAL)

____________________________________

City Clerk (Designee)

Approved as to Form and Content:

21

________________________________

City Attorney (Designee) 00524895

22

202

The following page(s) contain the backup material for Agenda Item: Housing, Land Use &

Transportation Committee Report (8/13/2020)

Please scroll down to view the backup material.

CB-6

CB-6

City of St. Petersburg Housing, Land Use & Transportation Committee

Report August 13, 2020 at 10:50 a.m.

Zoom Webinar

Present: Chair Amy Foster, Vice-Chair Brandi Gabbard, Robert Blackmon, Gina Driscoll, Darden Rice

Absent: None

Also Present: Council Member Figgs-Sanders, Council Member Montanari, Elizabeth Abernethy, Michael Dema, Robert Gerdes, Tom Greene, Derek Kilborn, and Bradley Tennant

Support Staff: Reneé Long – Legislative Aide

New Business

HB 1339 Update A presentation was given by Elizabeth Abernethy, Planning Development Director, regarding Florida House Bill 1339. Ms. Abernethy went over the language of the state statute, the Affordable Housing Advisory Committee’s motion at their July 22, 2020 meeting to encourage adoption and streamline the process, and potential code modifications (site plan review process, public notice, definition of Affordable, Affordability period). Ms. Abernethy stated that she wanted to bring the idea to Council to inquire if they had interest for staff to pursue some more specific recommendations and bring back to committee for consideration. Committee Vice-Chair Gabbard shared that she is in full support of moving forward with Ms. Abernethy’s offer to pursue more specific recommendations. Committee Vice-Chair Gabbard made a motion to ask staff to begin the process of putting something together and bringing this back to the committee as soon as they are able to do so. The motion was approved unanimously. Council Member (CM) Rice asked about the piece of the bill that would allow private entities to bond these projects but indicated this could be discussed offline if not the focus of today’s discussion. CM Rice added that she is in full support of moving forward. Committee Chair Foster asked that Ms. Abernethy draft something and bring it back to the committee. Committee Chair Foster asked Ms. Abernethy how much time she needed and if the September meeting is too soon. Ms. Abernethy offered to come back to the September meeting with more details as far as what staff is thinking of as a process. Mayor’s 10 Year Affordable Plan Housing Update A presentation was given by Robert Gerdes, Neighborhood Affairs Administrator, on an update of St. Petersburg’s Housing Plan. This 10-year plan was developed, setting goals to address housing affordability by expanding existing programs and introducing new solutions. The plan will impact approximately 7,000 households across the City. Overall, this is an approximate 75% increase over the previous 10 years. Mr. Gerdes’ presentation discussed low-and moderate-income households (those who earn up to 120% of the Area Median Income (AMI)) and noted that there has been a lot of developer interest recently. Mr. Gerdes will provide updates as they move along. Mr. Gerdes then discussed federal, state, and local funding including State Housing Initiative Partnership (SHIP) funding, City-Owned Land, Penny for Pinellas, South

St. Petersburg Community Redevelopment Area (SSP CRA), Floor Area Ratio (FAR) Bonus, and Linkage Fee. Lastly, Mr. Gerdes shared information about middle-income households and above (those who earn more than 120% of AMI).

CM Driscoll asked if the FAR Bonus should be revisited to make a change based on the status of the Linkage Fees, changing the calculation and increasing the amount that would go into affordable and workforce housing. Mr. Gerdes responded that based on HB 1339 and language regarding linkage fees he thinks there is opportunity for a hybrid model. That will be part of an on-going discussion with the Planning Department. Mr. Gerdes asked for time to work through some of the issues holistically and that could come back forward as a potential package at a later date.

CM Driscoll asked that regarding the purchase assistance for single-family home buyers, has staff looked at expanding that to not just include single-family homes such as condominiums or other types of dwelling. Mr. Gerdes clarified that a person can qualify for townhome, condominium, or single-family home purchasing assistance.

CM Rice asked if there is anything the City can do to help develop and encourage a loan product so that homeowners can find an affordable way to build accessory dwelling units (ADU)’s on their property. Mr. Gerdes responded that Mr. Kilborn and his team have a lending analysis currently going on that is grant funded so staff should get some information out of that. Mr. Gerdes added that there should be potential discussion in the future about a loan product. Mr. Gerdes’ concern is that he has limited resources to begin with and his priority on any funding he procures is to put towards multi-family since that puts the most units out there. Mr. Gerdes is unsure how they could fund such a loan product with all of the competing financial interest on housing affordability but is happy to look into it. CM Rice clarified and asked if the City could play an advocacy role. Mr. Gerdes stated that they could re-group with Jason Mathis and the banks and look at an opportunity to assist.

Committee Vice-Chair Gabbard shared that the LAIR committee will have a Sadowski fund update at their 2:00 p.m. meeting from the City’s lobbyists in Tallahassee. Committee Vice-Chair Gabbard also echoed CM Driscoll’s concern/question about going back and looking at the FAR Bonus now that Linkage Fee is not moving forward at this time. Committee Vice-Chair Gabbard encouraged Mr. Gerdes, Ms. Abernethy, and Mr. Kilborn to look at this again and see if that could be brought back into the conversation.

Committee Vice-Chair Gabbard also asked if staff has looked at increasing N-team funds, rebate for rehab funds, and programs as a City-wide resource. Mr. Gerdes responded that they have transitioned the rebate for rehab program into an affordable rebate for rehab. Significant funding is available, the rebate is much higher, but there is an affordability requirement. Committee Vice-Chair Gabbard clarified her question and asked if that had been expanded to be City-wide since it was initially CRA specific. Mr. Gerdes responded that he has not looked outside of that since the CRA funding is intended to be used for that. To go outside of the CRA, staff would have to look at alternative funding sources. Mr. Gerdes stated regarding the N-team, that it is funded through Sanitation through the Enterprise Fund, although a City-wide program. Two new employees were added to the team and Mr. Donald Putnam and Mr. James Corbett are working very hard on prioritizing different needs by the community and some volunteering issues they have had. Mr. Gerdes would like to have some time to work through those issues before discussing adding additional staff to the N-team.

Committee Vice-Chair Gabbard echoed her sentiments on CM Rice’s comments regarding ADU’s. Committee Vice-Chair Gabbard asked if it could be revisited at the beginning of the year. Committee Vice-Chair also asked about down-payment assistance and how they can get more serious about bolstering that. Lastly, Committee Vice-Chair stated that she wants to get back into conversation about the employer-

assisted housing program which is on the committee referral list. Committee Vice-Chair Gabbard stated that she will follow-up with Tom Greene. It was left off with discussion of distributing a survey to City employees to inquire if that may appeal to them. Committee Vice-Chair Gabbard stressed the importance to move the item forward.

CM Montanari asked how many lots are in inventory within the lot distribution program and where the funding comes from for the developer incentives and sidewalk incentives. Mr. Gerdes stated that the funding for the developer incentive comes from the CRA funding. The sidewalk reimbursement funding comes from the Housing Capital Improvement Fund. Mr. Gerdes stated that regarding the lot distribution program, essentially what is shown in the graph in his presentation is everything the City has that is available for this purpose. Mr. Gerdes added that within the Neighborhood Stabilization program, there are a few lots needing to be finished (around 25) that would potentially be added to the lots inventory at a future date.

CM Montanari asked for a quick refresher on how the program is managed; what is the process for allowing people to wait on these lots. Mr. Gerdes stated there is an approved developer application ensuring applicant is a registered business. After that, applicants are added to an approved developer list and as lots are approved for the program there will be a committee meeting (in September) in which all developers will be notified and they can apply for any of the lots that they want. The three-person committee will meet and select what lots are awarded to developers. If developer accepts lot then they enter into a lease to move forward.

Committee Chair Foster stated that she reviewed the referral list and just wanted to mention CM Gabbard already brought up her active item and the committee will still have source of income active as well. Everything else on the list should have been deleted because it was covered today or at the last meeting with the exception of the AHAC update, since they just had a meeting in July, that will be on the September meeting along with Ms. Abernethy so there is nothing else to review on the referral sheet.

Committee Chair Foster stated that if there is no other committee business the meeting is adjourned.

207

The following page(s) contain the backup material for Agenda Item: Legislative Affairs and

Intergovernmental Relations Committee Report (8/13/2020)

Please scroll down to view the backup material.

ST. PETERSBURG CITY COUNCIL

LEGISLATIVE AFFAIRS AND INTERGOVERNMENTAL RELATIONS

COMMITTEE

Report

August 13, 2020

Present: Chair Brandi Gabbard, Vice Chair Ed Montanari, Amy Foster, Deborah Figgs-Sanders

Lisa Wheeler-Bowman

Also: Council Members Robert Blackmon and Council Vice Chair Gina Driscoll, Assistant

City Attorneys Jane Wallace and Michael Dema, Chief of Policy and Public Engagement

Kevin King, Government Affairs Director John Rodriguez, Capitol Alliance Group

Managing Partner Dr. Jeffrey Sharkey, Neighborhood Affairs Administrator Rob Gerdes

Support Staff: Linnie Randolph

A. Call to Order – 2:00 p.m.

B. Approval of Agenda – CM Wheeler-Bowman moved approval, all members voted in

favor.

C. Approval of May 14, 2020 Minutes – Council Chair Montanari moved approval, all

members voted in favor.

D. New Business

1. Update from Tallahassee – Dr. Jeff Sharkey and John Rodriguez

Capitol Alliance Group Managing Partner Dr. Jeff Sharkey gave an update on the

current situation in Tallahassee stating that all state office buildings are closed and that

he does not believe there will be a call for a special session prior to the November

elections. The biggest issue now for the Governor is safely reopening the state with

phase II and how far that will go. The budget has been impacted significantly by

Covid-19. The Revenue Estimating Conference is tomorrow to give an update on the

State’s budget for this year and next year. Dr. Sharkey says it’s likely the legislature

will come back together in December to assess what the revenue impact will be. With

reserves and CARES funding both parties believe there will be enough money to keep

all state agencies running. The Governor has requested all state agencies to begin

exercising cutting 8% of their budgets this year and 10% for next year.

Florida housing update:

The Governor vetoed $255 million from SHIP funds. This veto does not move this

money in to the general fund. Instead, it holds them in the trust fund. The CARES

Act provided about $250 million in homeowner and rental assistance to help offset that

cut. This money went to the Florida Housing Finance Corporation which also allocates

SHIP funds to local governments. The Sadowski coalition is hopeful that when they

return in December that some if not all these funds can be allocated out to local

governments.

Committee meetings are scheduled to start on January 11, 2021 with Regular Session

starting March 2, 2021.

A new website has been posted called New Taxpayer Accountability & Transparency

Project which will score Cities and Counties on a 6-year average of per capita

spending, debt spending, government salaries, number of full-time employees per

100,000 residents, violent and property crime, local school grades and graduation

rates. This is opposed by the League of Cities and Counties and it’s unclear as to who

will be doing the data analysis.

Government Affairs Director John Rodriguez advised he is looking forward to us

crafting our legislative priorities. He says he’s been contacted by members of the

community who have ideas of things they’d like to see move forward this year as well.

Bills won’t start being filed until after the election in November so we have a couple

of months to get our priorities together and be ready this spring when they start filing

bills.

Council Chair Montanari mentioned the recommended budget cut request of 8 and

10% from the Governor. In reviewing the backup material Council Chair Montanari

mentioned our funding requests from this past session that were vetoed. He wants to

make sure that we do not slow down when it comes to having a robust vision for St.

Petersburg and to ask for everything that we want. He does not want us to limit our

requests based on where we stand right now.

Chief of Policy and Public Engagement Kevin King followed up on Council Chair

Montanari’s request comments that it is a challenging environment last year and

probably more so this year.

Dr. Sharkey responded that as we move through this there are going to be critical areas

that the legislature is going to try to support. Affordable housing and job development

and small business development are certainly in that category. He recommended that

as you begin to look at your priorities you may want to view them in the context of

what the needs are and why these requests are important at this time.

2. 2021 Legislative Session

a. Council Review of 2020 Priorities

Committee Chair Gabbard moved to the next topic and reviewing the list of 2020

priorities explaining that the only priority she sees that can be removed is Urban

Agriculture as we are moving ahead with a city ordinance that will address these

issues.

Council Vice-Chair Gina Driscoll advised she fully supports asking for what we need

and what we want. She then gave a brief update on vessel safety, which was a 2020

priority, stating that she has confirmed with Senator Rouson and Representative Webb

that they are both working on addressing this item again. She will continue to stay

informed by them and is ready to assist on this topic if needed.

Chair Gabbard asked Assistant City Attorney Jane Wallace about crafting the

upcoming resolutions to be topic specific without citing specific bill numbers. Ms.

Wallace deferred to Dr. Sharkey but also explained how items come back several

times until they are passed. The prior resolutions can be tweaked to reference any

changed language and to specify a specific bill number. Dr. Sharkey and Mr.

Rodriguez agreed with Ms. Wallace that it is always better to try to have the bill

number pinpointed on the resolution. Ms. Wallace explained that we can go ahead and

start the resolutions in advance then wait to finalize them once we have the bill

number.

b. Penny Amendment

Neighborhood Affairs Administrator Rob Gerdes gave an update stating that we made

some progress last year, but the elected officials interested in supporting this wanted to

see more support throughout the county. Mr. Gerdes said that he is currently working

to build a coalition of support and has already been in contact with Pinellas County

staff and the Pinellas County Housing Finance Authority. He is also working on talks

with the staff of the City of Clearwater and the City of Largo.

Mr. Gerdes asked Dr. Sharkey about the timeline for a resolution of support for this

item. Dr. Sharkey replied that Affordable Housing will be a well-received topic this

year and as long as the resolution is in by December it will be good to get on their

radar.

Committee Chair Gabbard opened the discussion and asked if the committee plans to

bring affordable housing as a priority this year, and that this item and the next item

from Council Member Blackmon would be good subtopics under this category of

priority. She is looking for a more holistic approach to our affordable housing request

and would like for a resolution of support from the committee to bring to Council so

that staff and our lobbying team to know they have the full support of Council.

c. Building Permit Special Revenue Fund

Council Member Blackmon gave a brief update on the building permit special revenue

fund stating that he would like to see a change in the statute (Fla. Stat. Sect. 553.80)

that includes a one-time spenddown, to come into compliance, on affordable housing.

This would be a one-time spend down of the overage money in this fund as mandated

by state statute. He believes that using this money to waive permit fees will help both

buyers and developers and it’s critical to reach out to stakeholders early in the process.

Assistant City Attorney Michael Dema followed up by stating that they have language

ready to go in draft form.

Chair Gabbard stated that these two items will come back at the October LAIR

meeting for updates on their coalition building and readiness for resolution.

3. 2021 Council Priorities

Chair Gabbard asked the committee if they would be interested in asking some of our

stakeholders to the October LAIR meeting to review some of their priorities.

Council Chair Montanari would like to suggest input from the three top universities

including USF St. Pete, St, Petersburg College, and Eckerd College in addition to the

Chamber of Commerce.

Council Member Deborah Figgs-Sanders supports building the education eco-system and

would like to know if this collaboration of support is to go after Federal dollars or ways

that we can tie in as a city to a system of collaboration. She stated we need to ensure that

we have the right key stakeholders and would like to include Mr. Sylvester Norwood

from Pinellas Technical College in this conversation.

Chair Gabbard replied that we want to be selective, but we do not want to leave anyone

out. As for Federal legislation, she noted that this is something that has been discussed in

the past but have never finalized a Federal priority list from this Council. Chair Gabbard

plans to bring this up again at the next meeting in October.

Chair Gabbard suggested a list of topics for the next meeting.

• Update on the Penny Amendment and the Building Permit discussion

• Stakeholder (5 min each) priority review

• Discussion on having a Federal priority list

Council Chair Montanari recommends a priority update from Forward Pinellas. Chair

Gabbard said she would reach out to Whit Blanton for an update from him and perhaps

an update from PSTA.

Meeting adjourned: 2:50 p.m.

The Next LAIR meeting will be held on: October 8, 2020 @ 2:00 p.m.

212

The following page(s) contain the backup material for Agenda Item: Health, Energy, Resiliency &

Sustainability Committee Report (8/27/2020)

Please scroll down to view the backup material.

City of St. Petersburg Health, Energy, Resiliency & Sustainability Committee

August 27, 2020 Meeting Minutes Zoom Virtual Meeting

1

Present: Committee Members – Committee Chair Gina Driscoll, Committee Vice-Chair Brandi Gabbard, Council Member Darden Rice, Council Member Robert Blackmon, and Council Chair Ed Montanari (Alternate) Also Present: Assistant City Administrator Tom Greene, Assistant City Attorney Christina Boussias, Healthy St. Pete Coordinator Kim Lehto, and Julie Rocco (Foundation for a Healthy St. Pete) Support Staff: Jayne Ohlman - City Council Legislative Aide 1. Call to Order – 10:51 AM 2. Approval of Agenda – CM Gabbard moved approval, all members voted in favor. 3. Approval of August 13, 2020 Minutes – CM Gabbard moved approval, all members voted in favor. 4. New Business –August 27, 2020 Review Draft Resolution of Support for the Creation of a Food Policy Council – Committee Chair Driscoll, Julie Rocco (Foundation for a Healthy St. Pete), Assistant City Attorney Christina Boussias

Committee Chair Driscoll introduced Julie Rocco, a Senior Community Engagement Advocate at the Foundation for a Healthy St. Petersburg, who began with an overview of the progress made so far for the soon to be established Food Policy Council. Ms. Rocco explained that individuals from multiple organizations/sectors have been identified and she has reached out to those individuals to determine their interest in participating in the Food Policy Council. Ms. Rocco stated that as of now, she has identified 18 potential members from various sectors that influence and/or are influenced by the local community-based food system. Ms. Rocco explained that the following organizations have been invited to participate in the Food Policy Council:

o Pinellas Suncoast Transit Authority (PSTA)

o Sustainable Urban Agriculture Coalition

o Black Farmers o League of Women Voters o Unite Pinellas o St. Pete Chamber of Commerce o Deuces Live o Pinellas Community Church o Feeding Tampa Bay

o St. Pete Free Clinic o USF St. Pete o Pinellas Community Schools o The City of St. Petersburg (Healthy St.

Pete/Health in all Policies – HiAP) o Johns Hopkins All Children’s Hospital o Area Agency on Aging o Florida Wildlife Corridor o The St. Pete Grocery Cooperative o Feeding America – SNAP Benefits

Program

Ms. Rocco noted that when the invitations were extended, organizations inquired if more than one designee could serve on the Food Policy Council. Ms. Rocco explained that although more than one voice is welcome, and organizations can certainly assign more than one designee

2

to attend the meetings, the structure of the Food Policy Council will be “one organization, one vote.” Once individuals are designated, the Food Policy Council will have their first meeting to establish goals and the role of the group.

CM Driscoll advised Ms. Rocco that she is in discussions with the Florida Department of Agriculture and Consumer Services about their potential role on the Food Policy Council.

Committee Vice-Chair Gabbard asked if an invitation has been extended to individuals in the education sector, such as Pinellas Technical College. Ms. Rocco responded that an invitation was extended to the Pinellas County School System and she also added that a few of the committed organizations listed above have representation in the educational sector, such as the Sustainable Urban Agriculture Coalition’s work with the Enoch Davis Youth Farm.

CM Gabbard asked for clarification on the official relationship the City will have with the Food Policy Council and inquired what, if any, Sunshine Law requirements the Food Policy Council might be subject to. Assistant City Attorney Christina Boussias, along with Committee Chair Driscoll, explained that the intent of the resolution is to support the creation of a Food Policy Council, which will be independent of the City and will serve as a stakeholder/advisory group and will not be subject to Sunshine Law. CM Driscoll explained that in researching other food policy councils, it was clear that the groups that were independent of local governments had more productive collaboration and outcomes.

Council Member Rice noted that in addition to PSTA’s participation, she suggested that Ms. Rocco reach out to Forward Pinellas for additional input from the transportation and planning sector.

CM Gabbard moved approval of the resolution in support of the creation of the Food Policy Council and all members voted in favor. CM Driscoll adjourned the meeting at 11:16 AM

215

The following page(s) contain the backup material for Agenda Item: Budget, Finance & Taxation

Committee Report (8/27/2020)

Please scroll down to view the backup material.

ST. PETERSBURG CITY COUNCIL

BUDGET, FINANCE & TAXATION COMMITTEE REPORT

Meeting of August 13, 2020

Present: Chair Ed Montanari, Vice Chair Amy Foster, Robert Blackmon, Gina Driscoll,

Brandi Gabbard (Alternate)

Other Council Members Present: Deborah Figgs-Sanders

Absent: None

Also: Assistant City Administrator, Tom Greene; Chief Financial Officer, Anne Fritz;

Budget Director, Elizabeth Makofske; Chief Assistant City Attorney, Jeannine

Williams; Bond Counsel Representative; Duane Draper; Public Financial

Management Representative, Jay Glover; Senior Deputy City Clerk, Cathy E.

Davis; Legislative Aide, Ben Weil

A. Call to Order – Chair Montanari called the meeting to order at 8:03 am.

B. Approval of Agenda – CM Foster made a motion to approve the agenda. All were in

favor of the motion.

C. Approval of July 30, 2020 Minutes – CM Foster made a motion to approve the

minutes. All were in favor of the motion.

D. – (a) Public Utility Debt Refunding Opportunity

Chief Financial Officer, Ms. Anne Fritz, introduced the Public Utility Debt Refunding

Opportunity item. As part of the utility rate study underway, certain outstanding debt (2013B)

while not having a current call feature, may be extinguished with a new issue on a taxable basis,

with a feature to then have an agreement in place that the City could execute a tax-exempt issue

at a stated interest rate ninety days before the call date of October 1, 2022. Ms. Fritz added that

other cities have done an advanced refunding on a taxable basis. Ms. Fritz explained that the City

looks for opportunities for refunding of outstanding debt on a regular basis and this opportunity

has been looked at since March 2020. Ms. Anne Fritz introduced Mr. Jay Glover, representative

from Public Financial Management, in order to give more context. On June 30, the City solicited

proposals through its Financial Advisor, Public Financial Management (PFM), to which they

received six responses. Mr. Glover added that after PFM’s and the City’s review of the

proposals, the City Administration recommends the proposal from TD Bank at a locked-in

taxable rate of 1.60%, and a forward agreement with a tax-exempt rate of 1.30 percent. Mr.

Glover added that it would achieve a Net Present Value savings to the City of $4.9 million with

the taxable option, and upon execution of the tax-exempt issue would increase the savings to

$5.9 million NPV. This opportunity will allow for the release of a portion of the reserve fund and

due to the new bond holders not requiring a reserve fund, the total gross savings on a cash-flow

basis is $8.3 million.

Chair Montanari asked why the annual debt service begins stable and then jumps to $1.2 million

in 2022, and again jumps to $7.5 million in 2029. Mr. Glover explained that the debt service

bonds were originally structured that way, and the refunding wouldn’t change the structure. He

additionally highlighted the savings section of the report. Chair Montanari asked Mr. Glover to

give more context to the ESCROW requirements. Mr. Glover explained that in order to pay off

all the bonds, the City has put the majority of the bond proceeds in an irrevocable ESCROW, and

invested that ESCROW in permitted investments. This is a special type of security called State

and Local Governments Series Certificates (SLGS). Mr. Glover highlighted the section of the

report to show how the SLGS will mature and pay off the bond in 2022. Chair Montanari asked

why the future 2022 resolution is included in the item. Mr. Duane Draper, Bond Counsel

representative, stated that they have structured the tax-exempt bond in advance and provided it in

the resolution in order to show the full context of the opportunity to the committee before it

would come to City Council.

CM Foster made a motion to approve the resolution. All were in favor of the motion

D. –(b) 3rd Quarterly Financial Reports

FY20 Third Quarter Budgetary Performance Report:

Budget Director, Liz Makofske presented the committee with an overview of FY20 third quarter

budgetary performance report. The following was presented:

FY20 Estimates and COVID-19 Pandemic:

• Actual effects on the city’s revenue sources are unknown due to the uncertainty of the

emergency’s length and overall effects on the city’s economy.

• Updated estimates for how each fund will be affected by the pandemic are included in

the report.

FY20 Stoplight Report:

• The General Fund beginning balance is $30.529 million

• Operating beginning fund balance (excluding BP and Irma reimbursement/Fighting

Chance Fund) is $29.341 million

• BP Settlement – $853K is shown in a separate line (all BP resources have been

appropriated.)

• Irma Reimbursement - $353K is shown on a separate line.

• 29 of the 38 funds shown on the stoplight report (76%) are operating within an

acceptable variance of plus or minus 2%.

FY20 General Fund Overview:

• Revenue projections are $279.542 million ($1.457 million under the amended budget

amount).

• The revenue reduction number is being updated daily with new information.

• In total, $8.497 million Hurricane Irma reimbursement, with $6.817 million

reimbursed to the General Fund.

• Expenditure projections are $292.515 million ($3.905 million over the amended

budget amount, and includes $6.8 million in Fighting Chance Fund expenditures)

• Currently projecting a use of $9.731 million in General Fund balance during FY20.

• The projected ending FY20 General Fund balance of $20.798 million is $6.874

million above the Core General Fund 5% target fund balance of $13.924 million

• The projected ending FY20 General Fund Group of Funds balance of $55.610 million

is $0.348 million below the General Fund Group of Funds 20% Target of $55.958

million

• For FY20, we are still estimating that the loss of revenue in the General Fund due to

the current COVID-19 pandemic can be absorbed by the General Fund’s fund

balance. We do not anticipate having to dip into the Economic Stability Fund at this

time.

• A total of 37 CIP projects were completed and closed in the third quarter of FY20

bringing the total projects completed this year to 97.

Chair Montanari asked about the current plan to not pull funds from the Economic Stability

Fund. Ms. Makofske stated that the General Fund balance can support the end of year

expenditures and loss of revenue. Chair Montanari asked about the Sanitation Equipment

Replacement Fund being below its target in the stoplight report. Ms. Makofske added the fund

has been below target for a while and the spending is planned based off the replacement of

sanitation vehicles. Once the equipment has been replaced, the City will work to build that fund

balance back up. Assistant City Administrator, Mr. Tom Greene added that the combination of

fund balances in the Sanitation Operating Fund, which is above target, and the Sanitation

Equipment Replacement Fund, would meet or exceed both fund’s targets. Chair Montanari asked

if the Fighting Chance Fund is included in the estimate amount over budget for the General Fund

expenditures. Ms. Makofske stated that it does include the Fighting Chance Fund expenditures.

Investments:

Ms. Fritz reported that as of June 30, 2020, the General Policy and Alternate Investment Policy

had a combined book value of $812.7 million, a market value of $831.1 million, with a total

unrealized gain of $18.427 million.

The City’s various portfolios within the City’s (General) Investment Policy include the

following:

• Core (Short Term and Long Term)

• Debt Service (payments are semi-annual and are invested until the amounts are due, and

contain long term debt service reserve requirements)

• Bond Proceeds (debt remaining unspent)

• Water Cost Stabilization (except for Index Funds covered under the Alternate Investment

Policy)

The Alternate Investment Policy portfolio have a combination of equity and fixed income, and

consist of the following:

• Water Cost Stabilization Fund

• Parks Preservation Fund (Weeki Wachee)

• Gizella Kopsick Palm Arboretum Investment Fund

• Gene Stacy Irrevocable Trust

Ms. Fritz explained some of the categories in the Amortized Book Value in the Short Term

Portfolio and Core Portfolio. The total of Short Term and Core portfolio had a book value of

$437.68 million and a market value of $447.57 million. The Debt Service portfolio had a book

value of $38.6 million and a market value of $38.99 million. The Bond Proceeds portfolio had a

book value of $245.1 million and a market value of $245.4 million. The Water Cost Stabilization

portfolio had a book value of $59.3 million and a market value of $61.4 million.

Ms. Fritz gave a brief overview of the activity for the quarter - purchases section in the report

and various bonds the City has purchased. Ms. Fritz also noted the general policy earnings from

investments, excluding Blackrock, which totaled $15.27 million. Ms. Fritz informed the

committee that the City is in compliance with its Liquidity Disclosure and Diversification

schedule. Also discussed was the investment credit risk report and index funds.

Debt:

As of June 30, 2020, the City had $105.4 million in governmental debt (principal only). Ms. Fritz

briefly discussed the various governmental debt principal and interest by fiscal year. Ms. Fritz

highlighted the funding sources for the general government debt. The water fund, stormwater

fund, sanitation fund, marina fund, and equipment replacement fund were additionally discussed.

Chair Montanari asked about the increase in penny debt for FY21 in the general government debt

section. Ms. Fritz stated that the increase in penny debt is mainly due to the Police Headquarters

project and other debt funded penny projects. Further the table referenced for FY20 amounts is

the remaining amounts to be paid this fiscal year only and the future fiscal years represent each

full year’s payments.

Pensions:

Data for the solvency tests for market value vs. actuarial was provided. The market value as a

percent of cost was as follows: ERS: 109%, Fire: 127%, and Police at 112%. At the end of the

quarter, the percentage funded for actuarial present value of benefits was as follows: ERS

99.55%, Fire 110.00%, and Police at 95.97%. The percentage funded for actuarial accrued

liability as of June 30, 2020 was 86.37% for ERS, 102.33% for Fire and 87.26% for Police. Ms.

Fritz stated that these values will change as all pension reporting for financial reporting and

actuarial reporting will be as of the end of the fiscal year and updated using the values as of that

date.

Parks Preservation (Weeki Wachee):

Revenue and transfers in for the Weeki Wachee fund was provided. There is now $1.4 million in

the fund, which saw a significant market recovery during the last quarter. For upcoming projects,

the City needs to be cognizant of market conditions.

D. –(c) FY21 Fiscal Policies Changes

Ms. Makofske and Ms. Fritz presented the proposed modifications to the city’s Fiscal

Policies for Fiscal Year 2021. Full descriptions of the proposed modifications to the city’s Fiscal

Policies are provided in the backup and include recommendations under the following

categories: Technical Corrections (Cleanup Items), Fund Balance Targets, Individual Fund

Guidelines, Enterprise Capital Improvements, and Fiscal Sustainability.

Chair Montanari stated that the fiscal policies document should be numbered and asked for some

word changes – take out the words “first ever” and “unanimously” in the new ISAP language

recommended to be included in the fiscal policies. Chair Montanari asked about the fiscal policy

change for funding capital improvements at 40/60 cash versus bond funding. The change is

written to have the target amended to 40/60 for the remainder of the ten-year CIP forecast instead

of the original target of 50/50 by FY22. Chair Montanari added that he believed the 40/60

agreement was just for the upcoming year, and not an agreed-upon target for the full ten years.

Mr. Greene stated that through the rate study, the City will reevaluate the 40/60 change to 50/50

funding on an annual basis. Vice Chair Driscoll stated that the 40/60 should be specifically

reviewed again in FY22, in order to try to achieve the 50/50 target as soon as possible. Ms. Fritz

stated that the document should have some word changes in order to potentially reference the

annual rate study, instead of stating a specific percent target. Assistant City Attorney, Ms.

Jeannine Williams added that legal can work with the Finance and Budget Departments to bring

back a document to full Council that has changes, and no action is needed until it comes to

Council.

E. Adjourned at 9:22 am