Salem/ Hope Creek Environmental Audit - Post-Audit Information Question #: GEN-4 Category: General Statement of Question: Please provide the following agency consultation documents associated with Attachment 5 (NJDEP) of the response presented at the Environmental Audit to Pre-Audit Question # GEN-4: A Response from Herbert Lord 6/25/2008 B NJDEP response to ER submittal 1/10 Response: The requested documents are being provided. List Attachments Provided: A Letter from NJDEP (H. Lord) to Tetra Tech NUS, Inc. (L. Bryan) regarding Salem and Hope Creek Generating Stations - License Renewal (rare species information), Trenton, New Jersey (6/25/08). B Letter from NJDEP (B. Quinn) to PSEG (E. Keating) regarding Salem and Hope Creek Nuclear Generating Stations License Renewal Lower Alloways Creek, Salem County Environmental Report (comments on the License Renewal Environmental Reports), Trenton, New Jersey (01/14/2010).

Transcript of Salem/ Hope Creek Environmental Audit

Salem/ Hope Creek Environmental Audit - Post-Audit Information

Question #: GEN-4 Category: General

Statement of Question: Please provide the following agency consultationdocuments associated with Attachment 5 (NJDEP) of the response presented atthe Environmental Audit to Pre-Audit Question # GEN-4:

A Response from Herbert Lord 6/25/2008

B NJDEP response to ER submittal 1/10

Response:The requested documents are being provided.

List Attachments Provided:

A Letter from NJDEP (H. Lord) to Tetra Tech NUS, Inc. (L. Bryan)regarding Salem and Hope Creek Generating Stations - LicenseRenewal (rare species information), Trenton, New Jersey (6/25/08).

B Letter from NJDEP (B. Quinn) to PSEG (E. Keating) regardingSalem and Hope Creek Nuclear Generating Stations LicenseRenewal Lower Alloways Creek, Salem County EnvironmentalReport (comments on the License Renewal EnvironmentalReports), Trenton, New Jersey (01/14/2010).

Salem/ Hope Creek Environmental Audit - Post-Audit Information

Question #: GEN-5 Category: General

Statement of Question:Please provide copies of the following permits associated with the responsepresented at the Environmental Audit to Pre-Audit Question # GEN-5:

Attachment 1 - Air PermitsA Title V Permit Application

Attachment 3 -- DredgingB New Jersey Waterfront Development PermitC USACOE Nationwide Permit NWP 3D USACOE Permit CENAP-OP-R-2006-6232 (dredging for the Hope

Creek barge slip)

Attachment 4 -- GroundwaterE NJ Permit 2216P Renewal Application

Attachment 5 - NJPDES PermitsF Hope Creek 2003 NJPDES Permit (with 2005 modification

included)

G Groundwater renewal SCH09124, PSEG submittal for renewal ofgroundwater permit (no date)

Response:The requested documents are being provided. It should be noted that items Eand G in the Statement of Question, above, request the same document.

List Attachments Provided:

A Letter from PSEG Nuclear LLC (L. Cataldo) to NJDEP (F. Steitz)regarding attached Title V Operating Permit Renewal Applicationfor the Hope Creek and Salem Generating Stations (10/28/2008),with attachment.

B Letter from NJDEP (S. Dietrick) to AKRF (G. Bickle) regardingattached Waterfront Development Permit No. 1704-02-0001.6WFD 080001 (authorizing five maintenance dredging events)(7/21/2009), with attachment.

C Letter from Department of the Army, Philadelphia District Corps ofEngineers (F. Cianfrani) to PSEG Nuclear LLC (C. White) regarding

USACOE Nationwide Permit NWP 3 (authorizing maintenancedredging and desilting operations) (7/14/2008), with enclosures.

D Letter from Department of the Army, Philadelphia District Corps ofEngineers (F. Cianfrani) to PSEG Nuclear LLC (J. Sears) regardingenclosed USACOE Permit CENAP-OP-R-2006-6232 (authorizingmechanical maintenance dredging within the Hope Creek bargeslip) (2/17/2010), with enclosures.

E Letter No. SCH09-124 from PSEG Nuclear LLC (R. Bernard) toNJDEP Bureau of Water Allocation (B. Ware) regarding enclosedPermit Renewal Application for Water Allocation Permit ProgramInterest ID 2216P, Activity No. WAP040001 (10/29/2009), withenclosures.

F Letter from NJDEP (P. Patterson) to PSEG Nuclear LLC (G.Salaman) regarding enclosed final Hope Creek Generating StationNJPDES Permit No. NJ0025411 (1/15/2003), with enclosures andwith the following clarifications and corrections:i. Authorization Page Correction (2/24/2003);ii. Clarification of Stormwater Requirements (3/03/2003);iii. Clarification of BOD 5 and TSS (1/31/2005).

G See Item E, above.

NON-PSE G.

JON S. CORZINEGovernor

Watt of Neur &tru rDEPARTMENT OF ENVIRONMENTAL PROTECTION

Division of Parks and ForestryOffice of Natural Lands Management

Natural Heritage ProgramP.O. Box 404

Trenton, NJ 08625-0404Tel. #609-984-1339Fax. #609-984-1427

LISA P. JACKSONCommissioner

June 25, 2008Larry BryanTetra Tech NUS, Inc.900 Trail Ridge RoadAiken, SC 29803

Re: Salem and Hope Creek Generating Stations - License Renewal

Dear Mr. Bryan:

Thank you for your data request regarding rare species information for the above referenced project site in Camden,Gloucester and Salem Counties.

Searches of the Natural Heritage Database and the Landscape Project (Version 3 for the highlands region, Version 2.1elsewhere) are based on a representation of the boundaries of your project site in our Geographic Information System(GIS). We make every effort to accurately transfer your project bounds from the topographic map(s) submitted with theRequest for Data into our Geographic Information System. We do not typically verify that your project bounds are accurate,or check them against other sources.

We have checked the Natural Heritage Database and the Landscape Project habitat mapping for occurrences of any rarewildlife species or wildlife habitat on the referenced site. Please see Table 1 for species list and conservation status.

Table 1 (on referenced site).

Common Name Scientific Name Federal Status State Status Grank SrankAmerican kestrel Falco sparverius SC G5 S3B,S3NAtlantic green turtle Chelonia mydas LT T G3 S1Atlantic loggerhead Caretta caretta LT E G3 $1bald eagle Haliaeetus leucocephalus E G4 S1B,S1Nbald eagle foraging Haliaeetus leucocephalus E G4 SIB,SIN

barred owl Strix varia T/T G5 S2B,S2Nbronze copper Lycaena hyllus E G5 51Cooper's hawk Accipiter cooper/i T/S G5 S2B,S4Neastern box turtle Terrapene carolina carolina SC G5T5 S3eastern king snake Lampropeltis g. getula U G5T5 S3Fowler's toad Bufo woodhousii fowleri SC G5 S3great blue heron Ardea herodias SC/S G5 S3B,S4N

hooded warbler Wilsonia citrina D/S G5 S3BKemp's or Atlantic ridley Lepidochelys kempii LE E G1 $1northern diamondback terrapin Malaclemys terrapin terrapin SC G4T4 S3northern pine snake Pituophis melanoleucus melanoleucus T .G4T4 S2osprey Pandion haliaetus T/T G5 S28pine barrens treefrog Hyla andersoni _ T G4 S2

red-headed woodpecker Melanerpes erythrocephalus T/T G5 S2B,S2N

red-shouldered hawk Buteo lineatus E/T G5 S1B,S2N

shortnose sturgeon Acipenser brevirostrum LE E G3 S1spotted turtle Clemmys guttata SC G5 $3

wood thrush Hylocichla mustelina SC/S G5 S38worm-eating warbler Helmitheros vermivorus S/S G5 S3B0

New Jersey Is An Equal Opportunity Employer 0 Printed on Recycled Paper and Recyclable

W We have also checked the Natural Heritage Database and the Landscape Project habitat mapping for occurrences of anyrare wildlife species or wildlife habitat within one half mile of the referenced site. Please see Table 2 for species list andconservation status. This table excludes any species listed in Table 1.

Table 2 (additional species within one half mile of referenced site).CommonName Scientific Name Federal Status State Status Grank Sranknorthern parula Parula americana P/S G5 S3B

We have also checked the Natural Heritage Database for occurrences of rare plant species or ecological communities. TheNatural Heritage Database has records for occurrences of Eupatorium resinosuin, Carex barrattii and Helonias bullata thatmay be on the site, for Vernonia glauca and Setaria magna that may be on or in the immediate vicinity of the site, and anadditional 36 records for rare species or ecological communities that may be in the immediate vicinity of the site. Theattached lists provide more information about these occurrences. Because some species are sensitive to disturbance orsought by collectors, this information is provided to you on the condition that no specific locational data are releasedto the general public. This is not intended to preclude your submission of this information to regulatory agenciesfrom which you are seeking permits.

Also attached is a list of rare species and ecological communities that have been documented from Camden, Gloucester andSalem County. If suitable habitat is present at the project site, these species have potential to be present.

Status and rank codes used in the tables and lists are defined in the attached EXPLANATION OF CODES USED IN NATURALHERITAGE REPORTS.

The Natural Heritage Program reviews its data periodically to identify priority sites for natural diversity in the State.Included as priority sites are some of the State's best habitats for rare and endangered species and ecological communities.Nine of these sites are located within or near the areas you have outlined. Please refer to the enclosed Natural HeritagePriority Site Maps for the locations and boundaries of these sites. On the back of each Priority Site Map is a reportdescribing the significance of the site. You may find the site biodiversity significance rating to be useful if you need toO prioritize among the sites in your environmental assessment.

If you have questions concerning the wildlife records or wildlife species mentioned in this response, we recommend thatyou visit the interactive I-Map-NJ website at the following URL, http://www.state.nj.us/dep/gis/depsplash.htm or contactthe Division of Fish and Wildlife, Endangered and Nongame Species Program at (609) 292 9400.

PLEASE SEE THE ATTACHED 'CAUTIONS AND RESTRICTIONS ON NHP DATA'.

Thank you for consulting the Natural Heritage Program. The attached invoice details the payment due for processing thisdata request. Feel free to contact us again regarding any future data requests.

Sincerely,

Herbert A. LordData Request Specialist

cc: Robert J. CarticaNHP File No. 08-General

0*

Frequently Asked QuestionsAbout Natural Heritage Priority Sites

• What are Natural Heritage Priority Sites?Through its Natural Heritage Database, the Office ofNatural Lands Management (ONLM) identifies criticallyimportant areas to conserve New Jersey's biologicaldiversity. The database provides detailed information onrare species and ecological communities to planners,developers, and conservation agencies for use in resourcemanagement, environmental impact assessment, and bothpublic and private land protection efforts.

Using the database, ONLM has identified 414 NaturalHeritage Priority Sites, representing some of the bestremaining habitat for rare species and exemplaryecological communities in the state. The DEPEndangered and Nongame Species Program provided keyinformation and assisted with the delineation of a numberof the sites. These areas should be considered to be toppriorities for the preservation of biological diversity inNew Jersey. If these sites become degraded ordestroyed, we may lose some of the unique componentsof our natural heritage.

How are Natural Heritage Priority Site maps usedW in conservation of biological diversity?

Natural Heritage Priority Site maps are used byindividuals and agencies concerned with the protectionand management of land. The maps have been used bymunicipalities preparing natural resource inventories;public and private conservation organizations preparingopen space acquisition goals; land developers andconsultants identifying environmentally sensitive lands;and public and private landowners developing landmanagement plans.

Natural Heritage Priority Sites contain some of the bestand most viable occurrences of endangered andthreatened species and ecological communities, but theydo not cover all known habitat for endangered andthreatened species in New Jersey. If information isneeded on whether or not endangered or threatenedspecies have been documented from a particular piece ofland, a Natural Heritage Database search can berequested by contacting the Office of Natural LandsManagement at the address below.

What do the boundaries of the sites contain?The boundaries of each Natural Heritage Priority Site aredrawn to encompass critical habitat for rare species orecological communities. Often the boundaries extend toinclude additional buffer lands that should be managed toprotect the habitat. A justification for the boundary isprovided for each site. The term "primary bounds" issometimes used to refer to boundaries enclosing criticalhabitat. The term "secondary bounds" issometimes used

to refer to boundaries enclosing additional buffer. Inmaps where both primary and secondary boundaries aredescribed, only the outermost boundary is provided in themapping.

What is the background map that the sites aredrawn upon?The sites are portrayed on background maps producedfrom a digital copy of the U.S. Geological Survey 7.5minute topographic maps. The background maps containtopographic lines as well as streams, lakes, roads, townsand place names. These background maps do not alwaysreflect recent changes in land development. Some maybe more than 20 years old. Some sites appear to beshifted in position against this topo map. This shift isdue to the fact that most sites have been digitized usingrectified aerial photography, and some of the digitizedUSGS topo maps do not align with this photography.

What do "public lands" depict on the maps?The "public lands" shaded on these maps are state-ownedopen space lands that have been digitized as a GIScoverage by the state Green Acres Program. Thisinformation is provided to show patterns of State landownership in the vicinity of the Priority Site. The publiclands are areas such as State Parks and Forests, WildlifeManagement Areas, and Natural Lands Trust preserves.They do not currently include lands owned by other stateagencies, federal, county or municipal governments ornonprofit conservation organizations. This GIS coverageis constantly being updated, and therefore future editionsof the maps will likely contain additional public landsthat are not currently mapped as such.

What is the biodiversity significance rank and howis it used?Each site is ranked according to its significance for

biological diversity using a scale developed by TheNature Conservancy, the network of Natural HeritagePrograms, and the New Jersey Natural Heritage Program.The ranks can be used to distinguish between sites thatare of global significance for conservation of biologicaldiversity vs. those that are of state significance. Theglobal biodiversity significance ranks range from B I toB5. In some cases the global biodiversity significancerank is then combined with a state biodiversitysignificance rank which provides information about thesignificance of the site on a state level. The statebiodiversity significance rank ranges from VI to V5. Thespecific definitions for each rank are as follows:

B1 - Outstanding significance (n a global level, generally the"last of the least" in the world, such as the only knownoccurrence of any element (species or ecological community),

the best or an excellent occurrence of an element rankedcritically imperiled globally, or a concentration (4+) of good orexcellent occurrences of elements that are imperiled orcritically imperiled globally. The site should be viable anddefensible for the elements or ecological processes contained.

B2 - Very high significance on a global level, such as the mostoutstanding occurrence of any ecological community. Alsoincludes areas containing other occurrences of elements that arecritically imperiled globally, a good or excellent occurrence ofan element that is imperiled globally, an excellent occurrenceof an element that is rare globally, or a concentration (4+) ofgood occurrences of globally rare elements or viableoccurrences of globally imperiled elements.

B3 - High significance on a global level, such as any' otherviable occurrence of an element that is globally imperiled, agood occurrence of a globally rare element, an excellentoccurrence of any ecological community, or a concentration(4+) of good or excellent occurrences of elements that arecritically imperiled in the State.

B4 - Moderate significance on a global level, such as a viableoccurrence of a globally rare element, a good occurrence of anyecological community, a good or excellent occurrence or onlyviable state occurrence of an element that is critically imperiledin the State, an excellent occurrence of an element that isimperiled in the State, or a concentration (4+) of goodoccurrences of elements that are imperiled in the State orexcellent occurrences of elements that are rare in the State.

B5 - Of general biodiversity interest on a global level.

Vt - Outstanding significance on a state level. Only knownoccurrence in the state for an element or Site with an excellentoccurrence or the best occurrence in the state for an elementranked critically' imperiled in the state or a concentration (4+)of good or excellent occurrences of elements that are imperiledor critically imperiledin the state.

How can I obtain Natural Heritage Priority Sitemaps for an area of interest to me?Natural Heritage Priority Site hard copy maps can beobtained by submitting a written request accompanied bya check or money order made payable to the Office ofNatural Lands Management at the following address:

Office of Natural Lands ManagementP.O. Box 404Trenton, NJ 08625-0404Phone: 609-984-1339; Fax: 609-984-1427

Individual 8.5" X 11" maps are available at the followingrate:1 - 10 site maps & reports:11 - 20 site maps & reports:ý> 20 sites:

$1.50/site$1.00/site$0.50/site

How often are the maps updated?The Natural Heritage Priority Site information isconstantly being updated in the Natural HeritageDatabase. A new edition of the maps will be madeavailable after significant revisions or additions to theDatabase.

April 5, 2006

SNJ Department of Environmental ProtectionDivision of Parks and Forestry

2 Natural Lands Management

V2 - Very high significance on a state level. Includes sitescontaining other occurrences of elements that are criticallyimperiled in the state .or a concentration (4+) of otheroccurrences of state imperiled elements and/or good orexcellent occurrences of state rare elements.

V3 - High significance on a state level. Includes sitescontaining the best occurrence in the state or an excellentoccurrence of a state imperiled element or multiple (2+) otheroccurrences for state imperiled elements and/or excellent, goodor moderate quality occurrences of state rare elements.

V4 - Moderate significance on a state level. Includes sitescontaining the best occurrence in the state or an excellentoccurrence of a state rare element or any site with otheroccurrences of a state imperiled element or multiple (2+) otheroccurrences of state rare elements.

V5 - Any site with any other occurrence of a state rare element.

Note: All sites have been assigned a global biodiversitysignificance rank (B rank), but not all sites have been assigneda state biodiversity rank (V rank).

Natural Heritage Priority SiteWinslow Pond

Locational Information

Quad Name: Williamstown.; HammontonCounty: Camden

Municipality Winslow Twp

Description of Site

Vernal pond.

Boundary Justification

Includes vernal pond plus adjacent buffer.

Biodiversity Rank B2

An excellent occurrence for'a globally rare plant species.

0• NI Dt•~e o f Envoiooola[~ Proteooooo

DOion of Prks, sod Foostry

Natural Lands ManagementJuly, 2001

Site Code: S.USNJHP1*595

Natural Heritage Priority Site

Winslow PondCamden County

QNJ Department ofEnvironmental ProtectionDivision of Parks and Forestry

Natural Lands Management0.5 0 0.5 Miles Priority Site

Public Land

N

W + E

S

Natural Heritage Priority SiteLittle Ease

Locational Information

Quad Name: Pitman East

County: Gloucester

- Municipality Franklin Twp

Description of Site

Powerline through wooded stream corridor.

Boundary Justification

Includes wetland habitat for rare plant species.

Biodiversity Rank

1 globally rare plant species.

0

0NI atm.ural of E Managoement iooDioi.~oo of P~rk5 .onI Ico• y

Natural Lands Management July, 2001Site Code: S.USNJHPI*326

Natural Heritage Priority Site

Little EaseGloucester County

NJ Department of Environmental ProtectionDivision of Parks and Forestry.

Natural Lands Management0.4 0 0.4 Miles 1 Priority Site

Public Land

N

S

Natural Heritage Priority Site

Winslow

Locational Information

Quad Name: Hammonton

County: Camden

Municipality Winslow Twp

Description of Site

A mixture of pine/oak uplands and white cedar/red maple lowlands with streamside bogs and ponds.

Boundary Justification

Primary boundary includes wetland habitat contiguous with the rare plant population. Secondary boundsinclude lands draining toward the habitat.

Biodiversity Rank j

The site contains a good population of a globally rare State-listed Endangered Plant Species.

0

0NJ •pnn o f Enolroamoeo, PNoteo11oDMiison ofMlh -d Fooooty

Natural Lands ManagementJuly, 2001

Site Code: S.USNJHPI*2458f

0

Natural Heritage Priority Site

WinslowCamden County

NJ Department of Environmental ProtectionDivision of Parks and Forestry

Natural Lands Management0.5 ' 0 0.5 Miles U Priority Site

, Public Land

N

W+ E

S

Natural Heritage Priority SiteRoadstown Road Powerline Site

Locational Information

Quad Name: Canton

County: Salem

Municipality Lower Alloways Creek Twp ; Quinton Twp

Description of Site

Powerline right-of-way through pine/oak uplands and small stream.

Boundary Justification

Primary bounds include extent of wetland habitat for plant species. Secondary bound includes uplandsdraining toward the wetlands.

Biodiversity Rank B3

Contains a globally imperiled plant species.

0

0N] /cprtcn ofE viromoa.ts Proec.oo

D fion ofp.,k, Wod Foroory

Natural Lands ManagementJuly, 2001

Site Code: S.USNJHPI*465

Natural Heritage Priority Site

Roadstown Road Powerline SiteSalem County

ANJ Department ofEnvironmental ProtectionDivision of Parks and Forestry

I Natural Lands Management0.4 0 0.4 Miles Priority Site

Public Land

N

w E

Natural Heritage Priority SitePecks Corner

Locational Information

Quad Name: Alloway

County: Salem:

Municipality Alloway Twp; Quinton Twp

Description of Site

A mixed hardwood-evergreen swamp forest surrounded by forested and nonforested uplands.

Boundary Justification

Primary boundary follows edge of contiguous wetland habitat. Secondary boundary includes lands drainingtoward the habitat.

Biodiversity Rank W5_1

The site contains a population of a globally rare Federally-listed Threatened Plant Species.

l• NI D•p,p~l t nl of EnovooomoNtal Prod co~fon

DWoid.. oMk, W Fo.y July, 2001Natural Lands Management Site Code: S.USNJHP1*2462

0

Pecks CornerSalem County

0•NJ Department of Environmenltal Protection

Division of~arks and ForestrY 03003 Mls[ roiyStNatural Lands Management Public Lands

Natural Heritage Priority SitePigs Eye

Locational Information

Quad Name: Delaware City.County: SalemMunicipality Pennsville Twp

Description of Site

Small wet depression at edge of agricultural field.

Boundary Justification

Includes all wetland habitat occupied by rare plant speciesand lands draining toward the wetlands.

Biodiversity Rank 1-41

Contains the only known occurrence for a state listed endangered plant species.

0

0Q Ni DW-1eNfE- .W,,,on,,nIoem

Natural Lands ManagementJuly, 2001

Site Code: S.USNJHPl*437

S U

~: ~&a}i& ivJ

4L

70

~tho e

01

aJ

BM 15 O

~.Christian LIa -. Center

t0*PO

-4ALI

At-N

-4-

0.

7 Q-

x

551

X/ff

10

X18

49

Harrt.A6 V-11le

Ln

10

-46-7*"

CýD

L

-a'- -- ~"- -.-*~- LT L 0

-~ -

-a'- -~

- -a'- -a'- -a'- -a'-

-a'- ~-a'--a'- -.-..- -~ -t

_ * 7,i-~ -- a' kj

-a'-a'- ~-

a- -

~--a'- -4~

-- a'

-a'- -a'--a'-- - - ~a'::~~

-a'- I1B

) Goose;,Pond

A0

A-a'

r',

-t- -K\ I

Natural Heritage Priority Site

Pigs EyeSalem County

QNI Department of Environmental ProtectionDivision of Parks and Forestry

Natural Lands Management0.3 0 3 Miles Priority Site

SPublic Land

N

w

0.3 0

Natural Heritage Priority SiteCoxhat Pond

Locational Information

Quad Name, AllowayCounty: SalemMunicipality Alloway Twp ; Quinton Twp

Description of Site

A mixed evergreen-deciduous swamp forest along a stream corridor.

Boundary Justification

Primary boundary follows wetland habitat occupied by the globally rare plant species. Secondary boundaryincludes lands that drain toward the habitat.

Biodiversity Rank W1

The site contains a population of a globally rare Federally-listed Threatened Plant Species.

Dison of pak_ .' d Foeotry July, 2001Natural Lands Management Site Code: S.USNJHP1*2459

0 -•no i46

Natural Heritage Priority Site

Coxhat PondSalem County

00

• NJ Department of Environmental Protection h

DiNatu rai Land Frsm Maaeet 0.4 0 0.4 Miles [•Priority Site W E

Naua ad angmn.11 "" Public Lands

Natural Heritage Priority SiteTelegraph Road Bog

Locational Information

Quad Name: AllowayCounty: SalemMunicipality Alloway Twp ; Quinton Twp

Description of SiteSwamp forest in headwaters of tributary to Deep Run. Forest dominated by mixed hardwood-pitch pine inheadwaters, more hardwood (gum/maple) dominated downstream; Surrounded by forested uplands.

Boundary Justification

Primary boundary includes wetland forest that is habitat for a globally rare plant species. Secondary boundaryincludes lands draining toward the wetland habitat.

Biodiversity Rank r

The site contains a good population of a globally rare Federally-listed Threatened Plant Species.

0

0NJ Dp oa lm I PNoL.Ctioo

Diision t '.k, . Fo-tY

Natural Lands ManagementJuly, 2001

Site Code: S.USNJHPI*2325

Natural Heritage Priority Site

Telegraph Road BogSalem County

NJ Department of Environmental ProtectionDivision of Parks and Forestry

Natural Lands Management0.4 0 0.4 Miles I Priority Site

r Public Land

N

S

0

Natural Heritage Priority Site 0Franks Cabin Site

Locational Information

Quad Name: Alloway

County: SalemMunicipality Alloway Twp

Description of Site

The site is a narrow headwater stream corridor with maple-gum-magnolia tree cover and standing water andSphagnum covered ground. The target species is found on the stream floodplain, in seeps and on the terracesjust above the floodplain.

Boundary Justification

Primary boundary includes wetland habitat for the rare plant species. The secondary boundary follows theminor watershed limits necessary to insure long term population survival.

Biodiversity Rank W

The site contains a good population of a federally listed threatened species.

0

0NI Dp•n, ofE En~oa Prmio•

DAV%' of P.k, . ForNYy July, 2001Natural Lands Management Site Code: S.USNJHP1*1645

Natural Heritage Priority. Site

Franks Cabin SiteSalem County

SNJf Department of Environmental ProtectionDivision of Parks and Forestry

Natural Lands Management0.2 0 0.2 Miles Priority Site

Public Land

N

w + E

S

CAUTIONS AND RESTRICTIONS ON NATURAL HERITAGE DATA

The quantity and quality of data collected by the Natural Heritage Program isdependent on the research and observations of many individuals and organizations. Notall of this information is the result of comprehensive or site-specific field surveys. Somenatural areas in New Jersey have never been thoroughly surveyed. As a result, newlocations for plant and animal species are continuously added to the database. Since dataacquisition is a dynamic, ongoing process, the Natural Heritage Program cannot provide adefinitive statement on the presence, absence, or condition of biological elements in anypart of New Jersey. Information supplied by the Natural Heritage Program summarizesexisting data known to the program at the time of the request regarding the biologicalelements or locations in question. They should never be regarded as final statements onthe elements or areas being considered, nor should they be substituted for on-site surveysrequired for environmental assessments. The attached data is provided as one source ofinformation to assist others in the preservation of natural diversity.

This office cannot provide a letter of interpretation or a statement addressing theclassification of wetlands as defined by the Freshwater Wetlands Act. Requests for suchdetermination should be sent to the DEP Land Use Regulation Program, P.O. Box 401,Trenton, NJ 08625-0401.

The Landscape Project was developed by the Division of Fish & Wildlife,Endangered and Nongame Species Program in order to map critical habitat for rare animalspecies. Natural Heritage Database response letters will also list all species (if any) foundduring a search of the Landscape Project. However, this office cannot answer anyinquiries about the Landscape Project. All questions should be directed to the DEPDivision of Fish and Wildlife, Endangered and Nongame Species Program, P.O. Box 400,Trenton, NJ 08625-0400.

This cautions and restrictions notice must be included whenever informationprovided by the Natural Heritage Database is published.

NV t Department ofEnvironmental Protectionon of Parks atd Forestry

~Natural1Lands Management

0

June 24, 2008Page: 1

Possibly on Project SiteBased on Search of Natural Heritage Database

Rare Plant Species and Ecological Communities Currently Recorded inthe New Jersey Natural Heritage Database

Scientific Name

Vascular Plant

Carex barrattii

Common Name

Barratt's Sedge

Pine Barren Boneset

Federal State Regional G RankStatus Status Status

S Rank Last Obs Ident Location

Eupatorium resinoszim

LP G4 S4 1934-05-21 Y NEAR VILLAGE, SW [OF] PORCHTOWN.

E LP, HL 03 S2 1985-09-12 Y POWERLINE CROSSING LITTLE EASERUN, S. OF GRANT AVE., N. OFFRANKLINVILLE.

LT E LP, HL G3 S3 1998-05-23 Y SMALL STREAM ON WEST SIDE OF RT. 49JUST NORTH OF THE INTERSECTION OFRT. 49 AND HARMERSVILLE ROAD.

QUINTON TWP.LT E LP, HL G3 S3 1999-04-07 Y NW ON TATTLETOWN RD. FROM

ROADSTOWN, THEN S. ALONGPOWERLINE ACCESS RD. 0.3 MI.

Helonias bullata

Helonias bullata

Swamp-pink

Swamp-pink

4 Records Selected

June*#08Page: 1

On or in Immediatcinity of Project SiteBased on Search of Natural Heritage Database

Rare Plant Species and Ecological Communities Currently Recorded inthe New Jersey Natural Heritage Database

Scientific Name

Vascular Plant

Setaria magna

Vernonia glauca

Common Name

Giant Fox-tail

Broad-leaf Ironweed

Federal State Status Regional G RankStatus Status

S Rank Last Obs Ident Location

HL G4G5 S2 1935-08-28 Y Along Alloways Creek, 3 mi. west ofHancock's Bridge; 3 mi. west-southwestof Hancock's Bridge.

SI 1935-05-12 Y CA. I MI. W. OF ELMER.E LP. HL G5

2 Records Selected

June 24, 2008Page: I

Immediate Vicinity of Project SiteBased on Search of Natural Heritage Database

Rare Plant Species and Ecological Communities Currently Recorded inthe New Jersey Natural Heritage Database

Scientific Name Common Name Federal State RegionalStatus Status Status

HL

G Rank S Rank Last Obs Ident Location

Internatl. Vegetation Classification

APmphaea odorata - Eleocharis robbinsii Coastal Plain PondHerbaceous Vegetation

Terrestrial Community - Other ClassificationBrackish tidal marsh complex Brackish Tidal Marsh Complex

G2 S1S2 2002-10-14 Y Site is 2 miles southeast of Alloway. FromAlloway, travel south on Route 540 about 2miles. Turn left (east) to powerlineright-of-way. Park. Walk northeast to majorbend in powerline right-of-way (about 0.5miles). Turn right (east) and follow trailthrough woods about 0.5 miles. Site is southof trail about 150 feet.

G4 S2? 1972-08-15 Y MANNINGTON MEADOW, KATESCREEK MEADOW, AND PINE ISLANDMEADOW.

G4 $2S3 2002-10-04 Y Site is about 1.3 miles eastsoutheast ofRemsterville. From Remsterville, travel easton Alloway-Lacey Road about 1.3 miles tolarge farm on right. Tom right into farm driveto southeast corner of drive. Park. Walk souththrough woods along trail to intersection withORV trail. Turn right. Site is about 500 feeton left. Need permission to access.

G5 St 1934-10-21 Y Along east side of Yorktown-Friesburg Rd,ca. 1 mi. NNE of Friesburg.

Leersia oryzoides -polygonum (caespitosum, Rice Cutgrass - (Orientalhydropiper) herbaceous vegetation Ladysthumb, Marshpepper

Knotweed) Coastal PlainIntermittent Pond HerbaceousVegetation

Vascular Plant

Aristida lanosa

Aster concolor

Carex barrattii

Castanea puinila

Woolly Three-awn Grass

Eastern Silvery Aster

E LP, HL

LP, HL 04? S2 1940-11-17 Y Ca. 2.5 miles NNE of Blue Bell.

Barratt's Sedge

Chinquapin

Chinquapin

LP

E LP, HL

E LP, HLCastanea pumnila

Coreopsis rosea

Eleocharis quadrangulata

Eleocharis quadrangulata

Helonias bullata

Rose-color Coreopsis

Angled Spike-rush

Angled Spike-rush

LP, HL

G4 S4 1985-05-12 Y W. SIDE BLUE ANCHOR FIRELANE, CA.0.5 MI. S. OF WILLIAMSTOWN-WINSLOW ROAD.

G5 S1 2000-05-31 Y Along Alloway-Friesburg Road, ca. 0.35 mi.west of Cobbs Mill Road.

G5 S1 2000-05-31 Y East side of Telegraph Road, approx. 0.65miles NW of intersection with Cool RunRoad.

G3 S2 1934-08-15 Y LITTLE EASE RUN 0.5 MI. N. OFFRANKLINVILLE.

G4 S2 Y Gravel pit in the Winslow WildlifeManagement Area, northwest of the AtlanticCity Expressway Interchange #33.

G4 S2 1971-08-25 Y Southwest of Salem, on Salem Country ClubGolf Course at junction of SinnicksonLanding Road and Fort Elfsborg Road.

G3 53 1998-05-23 Y CA. 2 MILES SOUTH EAST OF ALLOWAYTWP. ALONG STREAM DRAININGCOXHAT POND.

HL

HL

Swamp-pink LT E LP, HL

June*08Page: 2

Immediate VA@ of Project SiteBased on Search of Natural Heritage Database

Rare Plant Species and Ecological Communities Currently Recorded inthe New Jersey Natural Heritage Database

Common Name Federal State Regional G Rank S Rank Last ObsStatus Status Status

Scientific Name

[Jelonias bullata

Ident Location

Swamp-pink

Helonias bullata

Helonias bullata

Swamp-pink

Swamp-pink

Helonias bullata

Helonics bullata

Hydrocotyle ranunculoides

Nymphoides cordata

Onosmnodium virginianum

Onosmodium virginianum

Onosmodium virginianuin

Onosmodimni virginianum

Phoradendron leucarpum

Phoradendron leucarpum

Phoradendron leucarpum

Phoradendron leucarpumn

Swamp-pink

Swamp-pink

Floating Marsh-pennywort

Floatingheart

Virginia False-gromwell

Virginia False-gromwell

Virginia False-gromwell

Virginia False-gromwell

American Mistletoe

American Mistletoe

American Mistletoe

American Mistletoe

LT E LP, HL G3 S3 1998-05-17 Y Route 295 south to Route 42. Route 42 southto Route 55. Route 55 south to 553(south).Follow to Route 638(Willow Grove Road),turn left and follow for approximately I mile,

turn left on Langley Road. Follow to firstbend. Head north across powerline right ofway to wetlands.

LT E LP, HL G3 S3 2001-10-19 Y Along tributary to Deep Run, west of Route540, Ca. 1.5 miles south of the Route 540 -Route 581 intersection in Alloway.

LT E LP, HL G3 S3 2001-10-26 Y ALONG AN UNNAMED TRIBUTARY TOSTOW CREEK, CA. 0.8 ML. NNW OFJERICHO.

LT E LP, HL G3 S3 1937-05-07 Y INDIAN BRANCH OF SCOTLAND RUNCA. 1.5 MI. SW OF JANVIER.

LT E LP, HL G3 S3 1932-06-05 Y SARAH RUN, E. OF MARLBORO.

E LP, HL G5 S1 1985-??-?? Y N. SIDE OF LIGHTHOUSE RD. CA. 0.7 MI.WNW OF HARRISONVILLE.

LP, HL G5 S3 2004-08-06 Y Malaga Lake, Franklin Township.

E LP, HL G4 S1 1887-09-18 Y ROADSIDE BETWEEN MALAGA ANDIONA.

E LP, HL G4 SI 1936-04-07 Y NW OF MARLBORO, ABOUT OLD MARLPITS.

E LP, HL G4 S1 1937-10-10 Y 0.5 MI. W. OF BERRYLAND, ALT. 35 M.

E LP, HL G4 SI 1941-05-30 Y CA. 2.5 MILES NNE OF BLUE BELL.

LP, HL G5 S2 2008-03-15 Y Along the western side of the Blue AnchorFireline sand road, south of interchange 33 ofthe Atlantic City Expressway in the WinslowWildlife Management Area.

LP, HL G5 S2 2008-04-02 Y Wetland forest associated with the Great EggHarbor River at Malaga & New BrooklynRoad from Broad Lane to the Great EggHarbor River.

LP, HL G5 S2 2008-04-02 Y Deciduous wetland forest along theHospitality Branch approximately three milessouth of Williamstown.

LP, HL G5 S2 1935-04-15 Y Along tributary to Muddy Run about 1.5miles southeast of Elmer

E LP, HL G4G5 SI 1925-05-01 Y ALONG COOL RUN, ALDINE.Rhododendron atlanticum Dwarf Azalea

June 24, 2008Page: 3

Immediate Vicinity of Project SiteBased on Search of Natural Heritage Database

Rare Plant Species and Ecological Communities Currently Recorded inthe New Jersey Natural Heritage Database

Scientific Name

Rhynchospora inundata

Rhynchospora scirpoides

Rhynchospora scirpoides

Scirpus longii

Sisyrinchliurnfitscatumn

Trichostema setaceum

Utricularia purpurea

Utricularia purpurea

36 Records Selected

Common Name

Slender Horned-rush

Long-beak Bald-rush

Long-beak Bald-rush

Long's Woolgrass

Federal State RegionalStatus Status Status

LP, HL

G Rank S Rank Last Obs Iden

G3G4 S2 1985-??-?? Y

t Location

WEST OF FOLSOM RD., I Mi. SW OFWINSLOW.

HL

HL

G4 S2 1966-08-21 Y E. AND W. PONDS ABOUT ONE HALFWAY BETWEEN SYCAMORE LAKE ANDTHUNDERGUT POND, ALLOWAY.

G4 S2 2002-10-14 Y Two miles southeast of Alloway: fromAlloway, travel south on Route 540 about 2miles. Turn left (east) to powerlineright-of-way. Head northeast about 0.5 mile tomajor bend in powerline right-of-way. Turnright (east) and follow trail through woodsabout 0.5 mile. Site is about 150 feet south oftrail.

E LP, HL G2 S2 1910-06-18 Y ALONG THE GREAT EGG HARBORRIVER, NE OF ANDREWS.

Sand-plain Blue-eyed Grass

Narrow-leaf Bluecurls

*HL

HL

G5? S2 1941-05-30 Y Ca. 2.5 miles north-northeast of Blue Bell.

G5 S2 1934-10-21 Y Ca. I mile NNE of Friesburg.

G5 S3 2004-08-06 Y Malaga Lake.Purple Bladderwort

Purple Bladderwort

LP, HL

LP, HL G5 S3 Y Gravel pit in the Winslow WildlifeManagement Area,. northwest of the AtlanticCity Expressway Interchange #33.

-EXPLANATIONS OF CODES USED IN NATURAL HERITAGE REPORTS

FEDERAL STATUS CODES

The following US. Fish and Wildlife Service categories and their definitions of endangered and threatened plants and animals have been modified from the

U.S. Fish and Wildlife Service (F.R. Vol. SO No. 188; Vol. 61, No. 40; F.R. 50 CFR Part 1 7). Federal Status codes reported for species follow the most recent

listing.

LE

LT

PE

PT

Taxa formally listed as endangered.

Taxa formally listed as threatened.

Taxa already proposed to be formally listed as endangered.

Taxa already proposed to be formally listed as threatened.

Taxa for which the Service currently has on file sufficient information on biological vulnerability and threat(s) to support proposals to list

them as endangered or threatened species.

S/A Similarity of appearance species,

STATE STATUS CODES

Two animal lists provide state status codes after the Endangered and Nongame Species Conservation Act of 1973 (NSSA 23:2A-1 3 et. seq.): the list of

*ered species (N.J.A.C. 7:25-4.13) and the list defining status of indigenous, nongarne wildlife species of New Jersey (NJA.C. 7:25-4.1 7(a)). The status

al species is determined by the Nongame and Endangered Species Program (ENSP). The state status codes and definitions provided reflect the most

recent lists that were revised in the New Jersey Register, Monday, June 3, 1991.

D Declining species-a species which has exhibited a continued decline in population numbers over the years.

E Endangered species-an endangered species Is one whose prospects for survival within the state are in immediate danger due to one or

many factors - a loss of habitat, over exploitation, predation, competition, disease. An endangered species requires immediate

assistance or extinction will probably follow.

EX Extirpated species-a species that formerly occurred in New Jersey, but is not now known to exist within the state.

Introduced species-a species not native to New Jersey that could not have established itself here without the assistance of man.

INC Increasing species-a species whose population has exhibited a significant increase, beyond the normal range of its life cycle, over a long

term period.

T Threatened species-a species that may become endangered if conditions surrounding the species begin to or continue to deteriorate.

p Peripheral species-a species whose occurrence in New Jersey is at the extreme edge of its present natural range.

S Stable species-a species whose population is not undergoing any long-term increase/decrease within its natural cycle.

U Undetermined species-a species about which there is not enough information available to determine the status.

*tfor animals separated by a slash(/) indicate a duel status. First status refers to the state breeding population, and the second status refers to the

t8ory or winter population.

Page 2

SC Special Concern - applies to animal species that warrant special attention because of some evidence of decline, inherent vulnerability to

environmental deterioration, or habitat modification that would result in their becoming a Threatened species. This category would also be

applied to species that meet the foregoing criteria and for which there is little understanding of their current population status in the state.

Plant taxa listed as endangered are from NewJersey's official Endangered PlantSpecies List NJ.S.A. 131 B-1 5.151 et seq.

E Native New Jersey plant species whose survival in the State or nation is in jeopardy.

REGIONAL STATUS CODES FOR PLANTS AND ECOLOGICAL COMMUNITIES

LP Indicates taxa listed by the Pinelands Commission as endangered or threatened within their legal jurisdiction. Not all species currently

tracked by the Pinelands Commission are tracked by the Natural Heritage Program. A complete list of endangered and threatened

Pineland species is included in the New Jersey Pinelands Comprehensive Management Plan.

HL Indicates taxa or ecological communities protected by the Highlands Water Protection and Planning Act within the jurisdiction of the

Highlands Preservation Area.

EXPLANATION OF GLOBAL AND STATE ELEMENT RANKS

The Nature Conservancy developed a ranking system for use In identifying elements (rare species and ecological communities) of natural diversity most

endangered with extinction. Each element is ranked according to its global, national, and state (or subnational in other countries) rarity. These ranks are used

to prioritize conservation work so that the most endangered elements receive attention first. Definitions for element ranks are after The Nature Conservancy

(1982: Chapter 4, 4.1-1 through 4.4.1.3-3).

GLOBAL ELEMENT RANKS

GI Critically imperiled globally because of extreme rarity (5 or fewer occurrences or very few remaining individuals or acres) or because of

some factor(s) making It especially vulnerable to extinction.

G2 Imperiled globally because of rarity (6 to 20 occurrences or few remaining individuals or acres) or because of some factor(s) making it

very vulnerable to extinction throughout its range.

G3 Either very rare and local throughout Its range or found locally (even abundantly at some of its locations) in a restricted range (e.g., a

single western state, a physiographic region in the East) or because of other factors making it vulnerable to extinction throughout it's

range: with the number of occurrences in the range of 21 to 100.

G4 Apparently secure globally; although it may be quite rare in parts of its range, especially at the periphery.

GS Demonstrably secure globally; although it may be quite rare in parts of its range, especially at the periphery.

GH Of historical occurrence throughout its range I.e., formerly part of the established biota, with the expectation that it may be rediscovered.

GU Possibly in peril range-wide but status uncertain; more information needed.

GX Believed to be extinct throughout range (e.g., passenger pigeon),with virtually no likelihood that it will be rediscovered.

G? Species has not yet been ranked,

GNR Species has not yet been ranked,

Page 3

STATE ELEMENT RANKS

S Critically imperiled in New Jersey because of extreme rarity (5 or fewer occurrences or very few remaining individuals or acres). Elements

so ranked are often restricted to very specialized conditions or habitats and/or restricted to an extremely small geographical area of the

state. Also included are elements which were formerly more abundant, but because of habitat destruction or some other critical factor of

its biology, they have been demonstrably reduced in abundance. In essence, these are elements for which, even with intensive searching,

sizable additional occurrences are unlikely to be discovered.

S2 Imperiled in New Jersey because of rarity (6 to 20 occurrences). Historically many of these elements may have been more frequent but

are now known from very few extant occurrences, primarily because of habitat destruction. Diligent searching may yield additional

occurrences.

S3 Rare in state with 21 to 100 occurrences (plant species and ecological communities in this category have only 21 to 50 occurrences),

Includes elements which are widely distributed in the state but with small populations/acreage or elements with restricted distribution,

but locally abundant. Not yet imperiled in state but may soon be If current trends continue. Searching often yields additional

occurrences.

S4 Apparently secure in state, with many occurrences.

SS Demonstrably secure in state and essentially ineradicable under present conditions.

O SA Accidental in state, including species (usually birds or butterflies) recorded once or twice or only at very great intervals, hundreds or even

thousands of miles outside their usual range; a few of these species may even have bred on the one or two occasions they were recorded;

examples Include European strays or western birds on the East Coast and vice-versa.

SE Elements that are clearly exotic in New Jersey including those taxa not native to North America (introduced taxa) or taxa deliberately or

accidentally introduced into the State from other parts of North America (adventive taxa). Taxa ranked SE are not a conservation priority

(viable introduced occurrences of G1 or G2 elements may be exceptions).

SH Elements of historical occurrence in Newjersey. Despite some searching of historical occurrences and/or potential habitat, no extant

occurrences are known. Since not all of the historical occurrences have been field surveyed, and unsearched potential habitat remains,

historically ranked taxa are considered possibly extant, and remain a conservation priority for continued field work.

SP Element has potential to occur in New Jersey, but no occurrences have been reported.

SR Elements reported from New Jersey, but without persuasive documentation which would provide a basis for either accepting or rejecting

the report. In some instances documentation may exist, but as of yet, its source or location has not been determined.

SRF Elements erroneously reported from New Jersey, but this error persists in the literature.

SU Elements believed to be in peril but the degree of rarity uncertain. Also included are rare taxa of uncertain taxonomical standing. More

information is needed to resolve rank.

SX Elements that have been determined or are presumed to be extirpated from New Jersey, All historical occurrences have been searched

and a reasonable search of potential habitat has been completed. Extirpated taxa are not a current conservation priority.

SXC Elements presumed extirpated from New Jersey, but native populations collected from the wild exist in cultivation.

Page 4

SZ Not of practical conservation concern in New Jersey, because there are no definable occurrences, although the taxon is native and

appears regularly in the state. An SZ rank will generally be used for long distance migrants whose occurrences during their migrations

are too irregular (in terms of repeated visitation to the same locations), transitory, and dispersed, to be reliably identified, mapped and

protected. In other words, the migrant regularly passes through the state, but enduring, mappable element occurrences cannot be

defined.

Typically, the SZ rank applies to a non-breeding population (N) in the state - for example, birds on migration. An SZ rank may in a few

instances also apply to a breeding population (B), for example certain lepidoptera which regularly die out every year with no significant

return migration.

Although the SZ rank typically applies to migrants, It should not be used indiscriminately. Just because a species is on migration does

not mean it receives an SZ rank. SZ will only apply when the migrants occur in an irregular, transitory and dispersed manner.

B Refers to the breeding population of the element in the state.

N Refers to the non-breeding population of the element in the state.

T Element ranks containing a "T" indicate that the infraspecific taxon is being ranked differently than the full species. For example Stachys

pa/ustris var. homotr/chas is ranked "GST? SH" meaning the full species is globally secure but the global rarity of the var. homotricha has

not been determined: in New Jersey the variety is ranked historic.

Q Elements containing a "Q" in the global portion of its rank Indicates that the taxon Is of questionable, or uncertain taxonomical standing,

e.g., some authors regard it as a full species, while others treat it at the subspecific level,

.1 Elements documented from a single location,

Note: To express uncertainty, the most likely rank is assigned and a question mark added (e.g., G2?). A range is Indicated by combining two ranks (e.g.,

G1G2, S1S3).

IDENTIFICATION CODES

These codes refer to whether the identification of the species or community has been checked by a reliable individual and is indicative of significant habitat.

y Identification has been verified and is indicative of significant habitat.

BLANK Identification has not been verified but there is no reason to believe it is not indicative of significant habitat.

? Either it has not been determined if the record is indicative of significant habitat or the identification of the species or

community may be confusing or disputed.

Revised November 2007

01

30 AUG 2004

CAMDEN COUNTY

RARE SPECIES AND NATURAL COMMUNITIES PRESENTLY RECORDED IN

THE NEW JERSEY NATURAL HERITAGE DATABASE

NAME COMMON NAME FEDERAL

STATUS

STATE REGIONAL

STATUS STATUS

GRANK SRANK

- Vertebrates

ARDEA HERODIAS

CLEMMYS MUHLENBERGII

CROTALUS HORRIDUS HORRIDUS

FALCO PEREGRINUS

HYLA ANDERSONII

MELANERPES ERYTHROCEPHALUS

PITUOPHIS MELANOLEUCUS

MELANOLEUCUS

STRIX VARIA

CAREX STRIATA VAR BREVIS

HERBACEOUS VEGETATION

COASTAL PLAIN INTERMITTENT

POND

FRESHWATER TIDAL MARSH

COMPLEX

PINUS RIGIDA SATURATED

WOODLAND ALLIANCE

GREAT BLUE HERON

BOG TURTLE

TIMBER RATTLESNAKE

PEREGRINE FALCON

PINE BARRENS TREEFROG

RED-HEADED WOODPECKER

NORTHERN PINE SNAKE

BARRED OWL

LT

S/S

E

E

E

T

T/T

T

T/T

G5

G3

G4T4

G4

G4

G5

04T4

S2B, S4N

S2

S2

SIB, S?N

S3

S2B, S2N

S3

S3BG5

G?

** Ecosystems

WALTER'S SEDGE COASTAL PLAIN

INTERMITTENT POND HERBACEOUS

VEGETATION

VERNAL POND

FRESHWATER TIDAL MARSH COMPLEX

SSI3

G3? S2S3

G4? S3?

..* Invertebrates

ANAX LONGIPES

CALLOPHRYS IRUS

CELITHEMIS NARTHA

ENALLAGMA PICTUM

ENALLAGMA RECURVATUM

EPITHECA SPINOSA

ERYNNIS MARTIALIS

PITCH PINE LOWLANDS

(UNDIFFERENTIATED)

COMET DARNER

FROSTED ELFIN

MARTHA 'S PENNANT

SCARLET BLUET

PINE BARRENS BLUET

ROBUST BASKETTAIL

MOTTLED DUSKYWING

G3 S3

T

GS

G3

G4

G3

G3

G4

G3G4

S2S3

$2S3

S3S4

S3

S3

Si

SH

2

30 AUG 2004

CAMDEN COUNTY

RARE SPECIES AND NATURAL COMMUNITIES PRESENTLY RECORDED IN

THE NEW JERSEY NATURAL HERITAGE DATABASE

NAME COMMON NAME FEDERAL

STATUS

STATE REGIONAL

STATUS STATUS

- Vascular plants

GOMPHUS APOMYIUS

HELICODISCUS SINGLEYANUS

HESPERIA ATTALUS SLOSSONAE

LAMPSILIS RADIATA

LEPTODEA OCHRACEA

LIBELLULA AXILENA

LIGUMIA NASUTA

NICROPHORUS AMERICANUS,

PIERIS VIRGINIENSIS

POLYGONIA PROGNE

PONTIA PROTODICE

SPARTINIPHAGA CARTERAE

AESCHYNOMENE VIRGINICA

AGASTACHE SCROPHULARIIFOLIA

AMIANTHIUM MUSCITOXICUM

ARISTIDA DICHOTOMA VAR

CURTISSII

ARISTIDA LANOSA

ARISTIDA VIRGATA

ARNOGLOSSUM MUEHLENBERGII

ASCLEPIAS RUBRA

ASCLEPIAS VARIEGATA

ASCLEPIAS VERTICILLATA

ASTER CONCOLOR

ASTER RADULA

BIDENS BIDENTOIDES

BOTRYCHIUM ONEIDENSE

CACALIA ATRIPLICIFOLIA

BANNER CLUBTAIL

SMOOTH COIL

DOTTED SKIPPER

EASTERN LAMPMUSSEL

TIDEWATER MUCKET

BAR-WINGED SKIMMER

EASTERN PONDMUSSEL

AMERICAN BURYING BEETLE

WEST VIRGINIA WHITE

GRAY COMMA

CHECKERED WHITE

CARTER'S NOCTUID MOTH

SENSITIVE JOINT-VETCH

PURPLE GIANT-HYSSOP

FLY POISON

CURTISS' THREE-AWN GRASS

WOOLLY THREE-AWN GRASS

WAND-LIKE THREE-AWN GRASS

GREAT INDIAN PLANTAIN

RED MILKWEED

WHITE MILKWEED

WHORLED MILKWEED

EASTERN SILVERY ASTER

LOW ROUGH ASTER

ESTUARY BURR-MARIGOLD

BLUNT-LOBE GRAPE FERN

PALE INDIAN PLANTAIN

LE

T

T

T

T

E

GRANK

G4

G405

G3G4T3

O5

G4

G5

G4G5

G2G3

G3G4

G5

G4

G2G3

02

G4

G4G5

GST5

G5

G5T4T5

G4

G405

G5

G5

G4?

G5

G3

G4Q

G4G5

SRANK

S1

S2S3

S2S3

S3

S1

S31, S2N

S1

SH

SH

SH

S1

S2

LT E LP

S

S1

S2

S2

S2

S1

S2

SX. I

S2

S2

S2

S2

S1

S2s2

S1

LP

LP

S

3

30 AUG 2004

CAMDEN COUNTY

RARE SPECIES AND NATURAL COMMUNITIES PRESENTLY RECORDED IN

THE NEW JERSEY NATURAL HERITAGE DATABASE

NAME COMMON NAME FEDERAL

STATUS

STATE REGIONAL

STATUS STATUS

GRANK

CALAMOVILFA BREVIPILIS

CALYSTEGIA SPITNAMEA

CAREX AQUATILIS

CAREX BARRATTII

CAREX BUSHII

CAREX CUJMULATA

CAREX MITCHELLIANA

CAREX UTRICULATA

CASTILLEJA COCCINSA

CERCIS CANADENSIS

CHENOPODIUM RUBRUM

COELOGLOSSUM VIRIDE VAR

VIRESCENS

COMMELINA ERECTA

COREOPSIS ROSEA

CROTON WILLDENOWII

CUPHEA VISCOSISSIMA

CUSCUTA POLYGONORUM

CYPERUS ENGELMANNII

CYPERUS LANCASTRIENSIS

CYPERUS RETROFRACTUS

DESMODIUM STRICTUM

DESMODIUM VIRIDIFLORUM

DIODIA VIRGINIANA

DOELLINGERIA INFIRMA

DRABA REPTANS

ELATINE AMERICANA

EPILOBIUM ANGUSTIFOLIUM SSP

CIRCUMVAGUM

EPILOBIUM STRICTUM

PINE BARREN REEDGRASS

ERECT BINDWEED

WATER SEDGE

BARRATT'S SEDGE

BUSH'S SEDGE

CLUSTERED SEDGE

MITCHELL'S SEDGE

BOTTLE-SHAPED SEDGE

SCARLET INDIAN-PAINTBRUSH

REDBUD

RED GOOSEFOOT

LONG-BRACT GREEN ORCHID

SLENDER DAYFLOWER

ROSE-COLOR COREOPSIS

ELLIPTICAL RUSHFOIL

BLUE WAXWEED

SMARTWEED DODDER

ENGELMANN'S FLAT SEDGE

LANCASTER FLAT SEDGE

ROUGH FLATSEDGE

PINELAND TICK-TREFOIL

VELVETY TICK-TREEFOIL

LARGER BUTTONWEED

CORNEL-LEAF ASTER

CAROLINA WHITLOW-GRASS

AMERICAN WATERWORT

NARROW-LEAF FIREWEED

K

S

S

E

E

E

E

S

E

S

LP G4

G4GST4T5

G5

LP G4

G4

G4?

G3G4

G5

GSG5T5

G5

GST5

G5T5

LP G3

LP G5

G5?

G5

G4Q

G5

G5

LP 04

G5?

GST5

GS

Gs

G4

GST5

SRANK

S4

S5

S1

S4

S1

SH

32

S2

E2

Si

Si

S2

SH. 1

S2

S2

S3

52

S2

Si

SH

S2

82

Sl

S2

SK

82

Si

DOWNY WILLOWHERB G5? S2

4

30 AUG 2004

CAMDEN COUNTY

RARE SPECIES AND NATURAL COMMUNITIES PRESENTLY RECORDED IN

THE NEW JERSEY NATURAL HERITAGE DATABASE

NAME COMMON NAME FEDERAL

STATUS

STATE REGIONAL

STATUS STATUS

GRANK SPANK

ERIOCAULON PARKERI

ERIOPHORUM TENELLUM

ERYNGIUM YUCCIFOLIUM VAR

YUCCIFOLIUM

EUPATORIUM CAPILLIFOLIUM

EUPATORIUM HYSSOPIFOLIUM VAR

LACINIATUM

EUPATORIUM RESINOSUM

GENTIANA AUTUMNALIS

GLYCERIA GRANDIS

GNAPHALIUM HELLERI

HELONIAS BULLATA

HEMICARPHA MICRANTHA

HETERANTHERA MULTIFLORA

HYDRASTIS CANADENSIS

JUNCUS CAESARIENSIS

JUNCUS TORREYI

KUHNIA EUPATORIOIDES

LEMNA PERPUSILLA

LESPEDEZA STUEVEI

LIMOSELLA SUBULATA

LINUM INTERCURSUM

LISTERA AUSTRALIS

LYGODIUM PALMATUM

LYSIMACHIA HYBRIDA

MALAXIS UNIFOLIA

MELANTHIUM VIRGINICUM

MICRANTHEMUM MICRANTHEMOIDES

MUHLENBERGIA TORRFYANA

MYRIOPHYLLUM TENELLUM

PARKER'S PIPEWORT

ROUGH COTTON-GRASS

TALL RATTLESNAKE-RASTER

DOG-FENNEL THOROUGHWORT

TORREY'S BONESET

PINE BARREN BONESET

PINE BARREN GENTIAN

AMERICAN MANNA GRASS

SMALL EVERLASTING

SWAMP-PINK

SMALL-FLOWER HALFCHAFF SEDGE

BOUQUET MUD-PLANTAIN

GOLDEN SEAL

NEW JERSEY RUSH

TORREY'S RUSH

FALSE BONESET

MINUTE DUCKWEED

STUEVE'S DOWNY BUSH-CLOVER

AWL-LEAF MUDWORT

SANDPLAIN FLAX

SOUTHERN TWAYBLADE

CLIMBING FERN

LOWLAND LOOSESTRIFE

GREEN ADDER'S-MOUTH

VIRGINIA BUNCHFLOWER

NUTTALL'S MUDWORT

PINE BARREN SMOKE GRASS

SLENDER WATER-MILFOIL

G3

G5

G5T5

S2

Si

SX

G5 S1

G5T4T5 52

R

E

E

E

E

LT

E

E

E

E

E

E

E

E

E

LP G3

LP. G3

G5T5

G4G5T3?

LP G3

G4

G4

G4

LP G2

G5

GST5

G5

G4?

G4G5

G4

LP G4

LP G4

G5

G5

G5

GH

LP G3

G5

S2

S3

52

SH

S3

Si

S2

SH. 1

S2

Si

Si

Si

S2

SI"

Si

S2

$2

S3

S2

Si

SH

S3

Si

0

5

30 AUG 2004

CAMDEN COUNTY

RARE SPECIES AND NATURAL COMMUNITIES PRESENTLY RECORDED IN

THE NEW JERSEY NATURAL HERITAGE DATABASE

NAME COMMON NAME FEDERAL

STATUS

STATE REGIONAL

STATUS STATUS

NELUMBO LUTEA

NUPHAR MICROPHYLLUM

ONOSMODIUM VIRGINIANUM

PHASEOLUS POLYSTACHIOS VAR

POLYSTACHIOS

PHLOX MACULATA VAR MACULATA

PHORADENDRON LEUCARPUM

PLANTAGO PUSILLA

PLATANTHERA CILIARZS

PLATANTHERA FLAVA VAR FLAVA

PLATANTHERA FLAVA VAR

HERBIOLA

PLUCHEA FOETIDA

POLYGALA INCARNATA

POTAMOGETON OAKESIANUS

PRENANTHES AUTUMNALIS

PRUNUS ANGUSTIFOLIA

PUCCINELLIA FASCICULATA

PYCHANTHEMUM CLINOPODIOIDES

RANUNCULUS AMBIGENS

RANUNCULUS LONGIROSTRIS

RHYNCHOSPORA GLOBULARIS

RHYNCHOSPORA INUNDATA

RHYNCHOSPORA KNIESKERNII

RHYNCHOSPORA PALLIDA

ROTALA RAMOSIOR

EAGITTARIA EUBULATA

SAGITTARIA TERES

SCHEUCHZERIA PALUSTRIS

SCHIZAEA PUSILLA

AMERICAN LOTUS

SMALL YELLOW POND-LILY

VIRGINIA FALSE-GROMWELL

WILD KIDNEY BEAN

SPOTTED PHLOX

AMERICAN MISTLETOE

DWARF PLANTAIN

YELLOW FRINGED ORCHID

SOUTHERN REIN ORCHID

TUBERCLED REIN ORCHID

E

E

E

GRANK

G4

G5T4TS

G4

G4T?

G5T?

GB

G5

GS

G4T4?Q

G4T4Q

SRANK

E

LP

LP

STINKING FLEABANE

PINK MILKWORT

OAKES' PONDWEED

PINE BARREN RATTLESNAKE-ROOT

CHICKASAW PLUM

SALTMARSH ALKALI GRASS

BASIL MOUNTAIN-MINT

WATER-PLANTAIN SPEARWORT

LONG-BEAK WATER BUTTERCUP

COARSE GRASS-LIKE BEAKED-RUSH

SLENDER HORNED-RUSH

KNIESKERN'S BEAKED-RUSH

PALE BEAKED-RUSH

TOOTHCUP

AWL-LEAF ARROWHEAD

SLENDER ARROWHEAD

ARROW-GRASS

CURLY GRASS FERN

E

E

K

E

GSTS

GS

G4

LP G4G5

G5T4TS

G3G5

G2

G4

Gs

G5?

LP G3G4

LP G2

G3

G5

G4

G3

G5T5

LP G3

Si

SH

51

S2

S3

S2

SH

S2

S2

Si

SH

S2

82

S2

S2

Si

S2

S2

51

S2

S2

S3

S3

S2

Si

SH

£3

LT

E

E

6

30 AUG 2004

CAMDEN COUNTY

RARE SPECIES AND NATURAL COMMUNITIES PRESENTLY RECORDED IN

THE NEW JERSEY NATURAL HERITAGE DATABASE

NAME COMMON NAME FEDERAL

STATUS

STATE REGIONAL

STATUS STATUS

GRANK SRANK

SCHWALBEA AMERICANA

SCIRPUS LONGII

SCIRPUS MARITIMUS

SESUVIUM MARITIMUM

SETARIA MAGNA

SISYRINCHIUM FUSCATUM

SPHENOPHOLIS PENSYLVANICA

SPIRANTHES ODORATA

STACHYS HYSSOPIFOLIA

STACHYS TENUIFOLIA

STELLARIA PUBERA

THASPIUM BARBINODE

TRIADENUM WALTERI

TRICHOSTEMA SETACEUM

UTRICULARIA GIBBA

UTRICULARIA INTERMEDIA

VERBENA SIMPLEX

VULPIA ELLIOTEA

XYRIS FIMBRIATA

CHAFFSEED

LONG'S WOOLGRASS

SALTMARSH BULRUSH

SEABEACH PURSLANE

GIANT FOX-TAIL

SAND-PLAIN BLUE-EYED GRASS

SWAMP OATS

FRAGRANT LADIES'-TRESSES

-HYSSOP HEDGE-NETTLE

SMOOTH HEDGE-NETTLE

STAR CHICKWEED

HAIRY-JOINT MEADOW-PARSNIP

WALTER'S ST. JOHN'S-WORT

NARROW-LEAF BLUECURLS

HUMPED BLADDERWORT

FLAT-LEAF BLADDERWORT

NARROW-LEAF VERVAIN

SQUIRREL-TAIL SIX-WEEks GRASS

FRINGED YELLOW-EYED-GRASS

LE E

E

E

LP G2

LP G2

G5

G5G4G5

G5?

G4

G5

G5

G5

G5

G5

G5G5

LP G5

G5

G5

G5

G5

S1

S2

SH

S2

52

S2

S2

S2

E2-

S3

SH

SX

S1

S2

$3

$3

s1

SH

SI

E

E

E

E

E

149 Records Processed

0

1

30 AUG 2004

GLOUCESTER COUNTY

RARE SPECIES AND NATURAL COMMUNITIES PRESENTLY RECORDED IN

THE NEW JERSEY NATURAL HERITAGE DATABASE

NAME COMMON NAME FEDERAL

STATUS

STATE REGIONAL

STATUS STATUS

GRANK SRANK

- Vertebrates

ACCIPITER COOPERII

AMBYSTOMA TIGRINUM TIGRINUM

AMMODRAMUS HENSLOWII

AMMODRAMUS SAVANNARUM

ARODA HERODIAS

BARTRAMIA LONGICAUDA

NUTEO LINEATUS

CLEMMYS INSCULPTA

CLEMMYS MUHLENBERGII

DOLICHONYX ORYZIVORUS

FALCO PEREGRINUS

HALIAEETUS LEUCOCEPHALUS

HYLA ANDERSONII

MELANERPES ERYTHROCEPHALUS

PANDION HALIAETUS

PITUOPHIS MELANOLEUCUS

MELANOLEUCUS

PODILYMBUS PODICEPS

POOECETES GRAMINEUS

STRIX VARIA

COOPER'S HAWK

EASTERN TIGER SALAMANDER

HENSLOW'S SPARROW

GRASSHOPPER SPARROW

GREAT BLUE HERON

UPLAND SANDPIPER

RED-SHOULDERED HAWK

WOOD TURTLE

BOG TURTLE

BOBOLINK

PEREGRINE FALCON

BALD EAGLE

PINE BARRENS TREEFROG

RED-HEADED WOODPECKER

OSPREY

NORTHERN PINE SNAKE

PIED-BILLED GREBE

VESPER SPARROW

BARRED OWL

TWIG-RUSH COASTAL PLAIN

INTERMITTENT POND HERBACEOUS

VEGETATION

LT

LT

T/T

E

E

T/S

s/S

E

E/T

T

E

T/T

E

E

T

T/T

T/T

T

E/S

E

T/T

G5

GETS

G4

G5

G5

G5

G5

G4

G3

G5

G4

G4

04

G5

G5

G4T4

S3B, S4N

S2

SIB

S2B

S2B, S4N

SIB

SIB, S2N

S3

S2

S2B

SIB, S?N

SIB, S2N

S3

S2B, S2N

S2B

S3

SIB, S3N

SIB, S2N

S3B

G5

G5

G5

G3

.** Ecosystems

CLADIUM MARISCOIDES

HERBACEOUS VEGETATION

S2

2

30 AUG 2004

GLOUCESTER COUNTY

RARE SPECIES AND NATURAL COMMUNITIES PRESENTLY RECORDED IN

THE NEW JERSEY NATURAL HERITAGE DATABASE

COMMON NAME FEDERAL STATE REGIONAL

STATUS STATUS STATUS

NAME GRANK SRANK

ELEOCHARIS (OLIVACEA,

MICROCARPA, ROBBINSII) -

XYRIS (DIFFORMIS VAR

DIFFORMIS, SMALLIANA)

HERBACEOUS VEGETATION

FRESHWATER TIDAL MARSH

COMPLEX

RHEXIA VIRGINICA - PANICUM

VEREUCOSUN HERBACEOUS

VEGETATION

SPIKERUSH (SMALLFRUIT, BRIGHT

GREEN, ROBBIN'S) - YELLOWEYED

GRASS (BOG, SMALL'S) COASTAL

PLAIN INTERMITTENT POND

HERBACEOUS VEGETATION

FRESHWATER TIDAL MARSH COMPLEX

VIRGINIA MEADOW-BEAUTY - WARTY

PANICGRASS COASTAL PLAIN

INTERMITTENT POND HERBACEQUS

VEGETATION

G2 S2

G4? S3?

G2G3 SISI3

- Invertebrates

ALASMIDONTA UNDULATA

CATOCALA PRETIOSA PRETIOSA

CELITHEMIS MARTHA

ENALLAGMA PICTUM

FARONTA RUBRIPENNIS

GOMPHUS APOMYIUS

ITAME SP 1

LAMPSILIS CARIOSA

LAMPSILIS RADIATA

LEPTODEA OCHRACEA

LIBELLULA AURIPENNIS

LIGUMIA NASUTA

LITHOPHANE LEMMERI

MACROCHILO LOUISIANA

MACROCHILO SANTERIVALIS

MONOLEUCA SEMIFASCIA

HNICROPHORUS A4ERI CANUS

TRIANGLE FLOATER

PRECIOUS UNDERWING

MARTA 'S PENNANT

SCARLET BLUET

PINK STREAK

BANNER CLUBTAIL

-BARRENS ITAME

YELLOW LAMPMUSSEL

EASTERN LAMPMUSSEL

TIDEWATER MUCKET

GOLDEN-WINGED SKIMMER

EASTERN PONDMUSSEL

LEMMER'S 1OCTUID MOTH

A NOCTUID MOTH

A NOCTUID MOTH

A SLUG MOTH

AMERICAN BURYING BEETLE

T

T

T

G4

G4T2T3

G4

G3

G3G4

G4

G3

G3G4

as

G4

G5

G4G5

G3G4

G4

G3G4

G4G5

G2G3

S3

S2S3

S3S4

5$3

S3

S1

S3

S1

S3

Si

SIS2

S1

S2

S2S3

SlS3

S2S3

SHLE

03

30 AUG 2004

GLOUCESTER COUNTY

RARE SPECIES AND NATURAL COMMUNITIES PRESENTLY RECORDED IN

THE NEW JERSEY NATURAL HERITAGE DATABASE

NAME COMMON NAME FEDERAL

STATUS

STATE REGIONAL

STATUS STATUS

GRANK

G2

G3G4

SRANK

PYRGUS WYANDOT

ZANCLOGNATHA SP I

** Other types

*** Vascular plants

BALD EAGLE WINTERING SITE

AESCHYNOMENE VIRGINICA

AGASTACHE NEPETOIDES

ALOPECURUS CAROLINIANUS

AMIANTHIUM MUSCITOXICUM

ANEMONE CANADENSIS

APLECTRUM HYEMALE

ARISTIDA DICHOTOMA VAR

CURTISSII

ASCLEPIAS RUBRA

ASCLEPIAS VARIEGATA

ASCLEPIAS VERTICILLATA

ASIMINA TRILOBA

ASTER CONCOLOR

ASTER RADULA

BIDENS BIDENTOIDES

BOUTELOUA CURTIPENDULA

CACALIA ATRIPLICIFOLIA

CALLITRICHE PALUSTRIS

CARDAMINE LONGII

CAREX BARRATTII

CAREX FRANKII

CAREX LIMOSA

CAREX MITCHELLIANA

APPALACHIAN GRIZZLED SKIPPER

A NOCTUID MOTH

BALD EAGLE WINTERING SITE

SENSITIVE JOINT-VETCH

YELLOW GIANT-HYSSOP

TUFTED MEADOW-FOXTAIL

FLY POISON

CANADA ANEMONE

PUTTYROOT

CURTISS' THREE-AWN GRASS

RED MILKWEED

WHITE MILKWEED

WHORLED MILKWEED

PAWPAW

EASTERN SILVERY ASTER

LOW ROUGH ASTER

ESTUARY BURR-MARIGOLD

SIDE-OATS GRAMA GRASS

PALE INDIAN PLANTAIN

MARSH WATER-STARWORT

LONG'S BITTERCRESS

BARRATT'S SEDGE

FRANK'S SEDGE

MUD SEDGE

MITCHELL'S SEDGE

E SH

S3

G?

LT E LP G2

G5

G5

G4G5

G5

G5

GST5

E

E

E

E

E

LP G4G5

G5

G5

G5

LP G4?

G5

G3

OSTS

04G5

G5

G3

LP G4

G5

G5

G3G4

S1

S2

S3S4

S2

SX

S1

S2

S2

S2-

S2

S1

S2

SlS2

51

51

52

SH

S4

S3

SI

S2

4

30 AUG 2004

GLOUCESTER COUNTY

RARE SPECIES AND NATURAL COMMUNITIES PRESENTLY RECORDED IN

THE NEW JERSEY NATURAL HERITAGE DATABASE

COMMON NAME FEDERAL STATE REGIONAL

STATUS STATUS STATUS

NAME GRANK SRANK

CAREX POLYMORPHA

CAREX PRAIREA

CAREX UTRICULATA

CASTANEA PUMILA

CASTILLEJA COCCINEA

CORALLORHIIZA WISTERIANA

COREOPSIS ROSEA

CROTON WILLDENOWII

CUPHEA VISCOSISSIMA

CYPERUS ENGELMANNII

CYPERUS LANCASTRIENSIS

CYPERUS RETROFRACTUS

DALIBARDA REPENS

DESMODIUM LAEVIGATUM

DESMODIUM STRICTUM

DESMODIUM VIRIDIFLORUM

DOELLINGERIA INFIRMA

DRA1BA REPTANS

ELEOCHARIS EQUISETOIDES

ELEOCHARIS TORTILIS

ELEPHANTOPUS CAROLINIANUS

EPILOBIUM ANGUSTIFOLIUM SSP

CIRCUMVAGUM

EPILOBIUM STRICTUM

ERIOCAULON PARKERI

ERIOPHORUM GRACILE

ERIOPHORUM TENELLUM

EUPATORIUM RESINOSUM

GLYCERIA LAXA

GYMNOPOGON BREVIFOLIUS

VARIABLE SEDGE

PRAIRIE SEDGE

BOTTLE-SHAPED SEDGE

CHINQUAPIN

SCARLET INDIAN-PAINTBRUSH

SPRING CORALROOT

ROSE-COLOR COREOPSIS

ELLIPTICAL RUSHFOIL

BLUE WAXWEED

ENGELMANN'S FLAT SEDGE

LANCASTER FLAT SEDGE

ROUGH FLATSEDGE

ROBIN-RUN-AWAY

SMOOTH TICK-TREFOIL

PINELAND TICK-TREFOIL

VELVETY TICK-TREEFOIL

CORNEL-LEAF ASTER

CAROLINA WHITLOW-GRASS

KNOTTED SPIKE-RUSH

TWISTED SPIKE-RUSH

CAROLINA ELEPHANT-FOOT

NARROW-LEAF FIREWEED

DOWNY WILLOWHERB

PARKER'S PIPEWORT

SLENDER COTTON-GRASS

ROUGH COTTON-GRASS

PINE BARREN BONESET

NORTHERN MANNA GRASS

SHORT-LEAF SKELETON GRASS

EE

E

G3

G5?

G5

G5

G5

G5

LP G3LP G5

G5?

G4QG5

GS

GS

G5

LP G4

G5?

G5

Gs

LP G4

G5

G5

G5T5

G5?

G3

G5T?

G5

LP G3

G5

G5

Sl

S2

S2

Si

S2

SX

S2

52

S3

52

SH

SH. 1

S3

S2

S2

S2

SH

Si

51

SH

S1

S2

52

SH

Si

S2

S1S1

E

E

E

E

E

E

E

05

30 AUG 2004

GLOUCESTER COUNTY

RARE SPECIES AND NATURAL COMMUNITIES PRESENTLY RECORDED IN

THE NEW JERSEY NATURAL HERITAGE DATABASE

NAME COMMON NAME FEDERAL

STATUS

STATE REGIONAL

STATUS STATUS

GRANK SPANK

HELONIAS BULLATA

HETERANTHERA MULTIFLORA

LESPEDEZA STUEVEI

LUDWIGIA LINEARIS

LUZULA ACUMINATA

LYCOPODIELLA INUNDATA

LYGODIUM PALMATUM

LYSIMACHIA HYBRIDA

MALAXIS UNIFOLIA

MELANTHIUM VIRGINICUM

MICRANTHEMUM MICRANTHEMOIDES

MUHLENBERGIA CAPILLARIS

MUHLENBERGIA TORRRYANA

NYMPHOIDES CORDATA

OBOLARIA VIRGINICA

ONOSMODIUM VIRGINIANUM

PANICUM ACICULARE

PASPALUM DISSECTUM

PENSTEMON LARVIGATUS

PHASEOLUS POLYSTACHIOS VAR

POLYSTACHIOS

PHLOX MACUJATA VAR MACULATA

PHORADENDRON LEUCARPUM

PINUS SEROTINA

PLATANTHERA CILIARIS

POLYGALA INCARNATA

POLYGALA MARIANA

POLYGONUM HYDROPIPEROIDES VAR

OPELOUSANUM

PRUNUS ANGUSTIFOLIA

SWAMP-PINK

BOUQUET MUD-PLANTAIN

STUEVE'S DOWNY BUSH-CLOVER

NARROW-LEAF PRIMROSE-WILLOW

HAIRY WOOD-RUSH

NORTHERN BOG CLUB-MOSS

CLIMBING FERN

LOWLAND LOOSESTRIFE

GREEN ADDER'S-MOUTH

VIRGINIA BUNCHFLOWER

NUTTALL'S MUDWORT

LONG-AWN SMOKE GRASS

PINE BARREN SMOKE GRASS

FLOATINGNEART

VIRGINIA PENNYWORT

VIRGINIA FALSE-GROMWELL

BRISTLING PANIC GRASS

MUDBANK CROWN GRASS

SMOOTH BEARDTONGUE

WILD KIDNEY BEAN

SPOTTED PHLOX

AMERICAN MISTLETOE

POND PINE

YELLOW FRINGED ORCHID

PINK MILKWORT

MARYLAND MILKWORT

OPELOUSAS WATER-PEPPER

LT S

E

E

E

E

E

LP G3

04

G4?

LP G5

GST4TS

GSLP G4

Gs

G5

G5

GH

G5T?

LP G3

LP G5

G5

G4

G4G5

G4?

G5

G4T?

G5T?

LP G5

GS

LP G5

G5

LP GS

G5T?Q

E

CHICKASAW PLUM E G5T4T5 S2

6

30 AUG 2004

GLOUCESTER COUNTY

RARE SPECIES AND NATURAL COMMUNITIES PRESENTLY RECORDED IN

THE NEW JERSEY NATURAL HERITAGE DATABASE

4ON NAME FEDERAL STATE RE

STATUS STATUS SI

COMn EGIONAL

7ATUS

GRANK SRANK

PUCCINELLIA FASCICULATA

PYCNANTHEMUM TORREI

QUERCUS IMBRICARIA

QUERCUS MUEHLENBERGII

RANUNCULUS AMBIGENS

RANUNCULUS LONGIROSTRIS

RHYNCHOSPORA GLOBULARIS

RHYNCHOSPORA INUNDATA

RHYNCHOSPORA NITENS

RHYNCHOSPORA PALLIDA

RHYNCHOSPORA SCIRPOIDES

ROTALA RAMOSIOR

SAGITTARIA SUBULATA

SCHEUCHZERIA PALUSTRIS

SCHIZAEA PUSILLA

SCUTELLARIA NERVOSA

SISYRINCHIUM FUSCATUM

SPHENOPHOLIS PENSYLVANIICA

SPIRANTHES LACINIATA

SPIRANTHES ODORATA

SPOROBOLUS COMPOSITUS VAR

COMPOSITUS

STACHYS HYSSOPIFOLIA

STACHYS TENUIFOLIA

THASPIUM BARBINODE

TIPULARIA DISCOLOR

TRICHOSTEMA SETACEUM

UTRICULARIA BIFLORA

UTRICULARIA GIBBA

VALERIANELLA RADIATA

SALTMARSH ALKALI GRASS

TORREY' S MOUNTAIN-MINT

SHINGLE OAK

YELLOW OAK

WATER- PLANTAIN SPEARWORT

LONG-BEAK WATER BUTTERCUP

COARSE GRASS-LIKE BEAKED-RUSH

SLENDER HORNED-RUSH

SHORT-BEAKED BALD-RUSH

PALE BEAKED-RUSH

LONG-BEAK BALD-RUSH

TOOTHCUP

AWL-LEAF ARROWHEAD

ARROW-GRASS

CURLY GRASS FERN

VEINED SKULLCAP

SAND-PLAIN BLUE-EYED GRASS

SWAMP OATS

LACE-LIP LADIES'-TRESSES

FRAGRANT LADIES' -TRESSES

LONG-LEAF RUSH-GRASS

HYSSOP HEDGE-NETTLE

SMOOTH HEDGE-NETTLE

HAIRY-JOINT MEADOW-PARSNIP

CRANEFLY ORCHID

NARROW-LEAF BLUECURLS

TWO-FLOWER BLADDERWORT

HUMPED BLADDERWORT

BEAKED CORNSALAD

E

E

E

G3G5

G2

G5

G5

G4

G5

G5?

LP G3G4

G4?

G3

G4

G5

G4

GST5

LP, G3

G5

G5?

G4

G4G5

G5

G5T5

GS

G5

G5

G4G5

G5

G5

LP G5

G5

S2

Si.1

S3

S2

S2

S2

$3 -

S2

S3

S2S3

S2

S2

S2

S1 "

S2

S2

S2

$3

S2

S2S2

S3

S3

SI51

E

E

E

97

30 AUG 2004

GLOUCESTER COUNTY

RARE SPECIES AND NATURAL COMMUNITIES PRESENTLY RECORDED IN

THE NEW JERSEY NATURAL HERITAGE DATABASE

NAME COMMON NAME FEDERAL

STATUS

STATE REGIONAL

STATUS STATUS

GRANK SRANK

VERBENA SIMPLEX

VERNONIA GLAUCA

VULPIA ELLIOTEA

NARROW-LEAF VERVAIN

BROAD-LEAF IRONWEED

SQUIRREL-TAIL SIX-WEEKS GRASS

E

E

E

G5

GS

G5

Si

Si

SH

154 Records Processed

1

30 AUG 2004

SALEM COUNTY

RARE SPECIES AND NATURAL COMMUNITIES PRESENTLY RECORDED IN

THE NEW JERSEY NATURAL HERITAGE DATABASE

NAME COMMON NAME FEDERAL

STATUS

STATE REGIONAL

STATUS STATUS

GRANK SRANK

- Vertebrates

ACCIPITER COOPERII

AMBYSTOMA TIGRINUM TIGRINUM

AMMODRAMUS SAVANNARUm

ARDEA HERODIAS

BARTRAMIA LONGICAUDA

BUTEO LINEATUS

CIRCUS CYANEUS

CISTOTHORUS PLATENSIS

CLEMMYS MUHLENBERGII

DOLICNONYX ORYZIVORUS

FALCO PEREGRINUS

HALIAEETUS LEUCOCEPHALUS

MYLA ANDERSONII

LYNX RUFUS

MELANERPES ERYTHROCEPHALUS

NOTROPIS CHALYBAEUS

PANDION NALIAETUS

PASSERCULUS SANDWICHENSIS

PITUOPHIS MELANOLEUCUS

MELANOLEUCUS

PODILYMBUS PODICEPS

POOECETES GRAMINEUS

STRIX VARIA

BRACKISH TIDAL MARSH COMPLEX

FRESHWATER TIDAL MARSH

COMPLEX

FRESHWATER TIDAL SWAMP

COOPER'S HAWK

EASTERN TIGER SALAMANDER

GRASSHOPPER SPARROW

GREAT BLUE HERON

UPLAND SANDPIPER

RED-SHOULDERED HAWK

NORTHERN HARRIER

SEDGE WREN

BOG TURTLE

BOBOLINK

PEREGRINE FALCON

BALD EAGLE

PINE BARRENS TREEFROG

BOBCAT

RED-HEADED WOODPECKER

IRONCOLOR SHINER

OSPREY

SAVANNAH SPARROW

NORTHERN PINE SNAKE

PIED-BILLED GREBE

VESPER SPARROW

BARRED OWL

BRACKISH TIDAL MARSH COMPLEX

FRESHWATER TIDAL MARSH COMPLEX

LT

LT

T/T

.E

T/S

S/S

E

E/T

E/U

E

E

T/T

E

E

T

E

T/T

T/T

T/T

T

E/S

E

T/T

05

G5T5

G5

G5

G5

G5

05

G5

G3

G5

G4

04

G4

G5

G5

G4

05

G5

G4T4

S3B, S4N

S2

S2B

S2B, S4N

SIB

SIB, S2N

SIB, S3N

SIB

S2

S2B

SIB, S?N

SIB, S2N

S3

S3

S2B, S2N

SIS2

S2B

S2B, S4N

S3

SIB, S3N

SIBS2N

S3B3

G5

G5

G5

** Ecosystems

G4 S27

G4? S3?

G3? SIS2FRESHWATER TIDAL SWAMP

030 AUO 2004

SALEM COUNTY

RARE SPECIES AND NATURAL COMMUNITIES PRESENTLY RECORDED IN

THE NEW JERSEY NATURAL HERITAGE DATABASE

NAME COMMON NAME FEDERAL

STATUS

STATE REGIONAL

STATUS STATUS

GRANE

LEERSIA ORYZOIDES - POLYGONUM

(CAESPITOSUM, HYDROPIPER)

HERBACEOUS VEGETATION

NYMPHAEA ODORATA - ELEOCHARIS

ROBBINSII HERBACEOUS

VEGETATION

- Invertebrates

ACRONICTA ALBARUFA

CATOCALA PRETIOSA PRETIOSA

CHYTONIX SENSILIS

CUCULLIA ALFARATA

EPITHECA SPINOSA

FARONTA RUBRIPENNIS

GOMPHUS APOMYIUS

ITAME SP 1

LAMPSILIS RADIATA

LITHOPHANE LEMMERI

LYCAENA HYLLUS

MACROCHILO HYPOCRITALIS

MACROCHILO SP 1

MONOLEUCA SEMIFASCIA

PROBLEMA BULENTA

ZANCLOGNATHA SP 1

BALD EAGLE WINTERING SITE

RICE CUTGRASS - (ORIENTAL

LADYSTHUMB, MARSHPEPPER

KNOTWEED) COASTAL PLAIN

INTERMITTENT POND HERBACEOUS

VEGETATION

WHITE WATERLILY - ROBBINS

SPIKERUSH COASTAL PLAIN

INTERMITTENT POND HERBACEOUS

VEGETATION

BARRENS DAGGER MOTH

PRECIOUS UNDERWING

A NOCTUID MOTH

A MOTH

ROBUST BASKETTAIL

PINK STREAK

BANNER CLUBTAIL

BARRENS ITAME

EASTERN LAMPMUSSEL

LEMMER'S NOCTUID MOTH

BRONZE COPPER

A NOCTUID MOTH

A NOCTUID MOTH

A SLUG MOTH

RARE SKIPPER

A NOCTUID MOTH

BALD EAGLE WINTERING SITE

G2

G4

G3G4

G4T2T3

G4

G4

G4

G3G4

G4

G3

G5

G3G4

G5

G4

G3

G4G5

G2G3

G3G4

SU

$2S3

SIS3

S2?

S1

S3

S1

S3

S3

S2

S2

S3S4

S3

$2S3

S2

S3

SRANK

S2S3

SS2

T

E

*** Other types

30 AUG 2004

SALEM COUNTY

RARE SPECIES AND NATURAL COMMUNITIES PRESENTLY RECORDED IN

THE NEW JERSEY NATURAL HERITAGE DATABASE

NAME COMMON NAME FEDERAL

STATUS

STATE REGIONAL

STATUS STATUS

GRANK SRANK

*** Vascular plants

AESCHYNOMENE VIRGINICA

AGASTACHE NEPETOIDES

ALOPECURUS AEQUALIS VAR

AEQUALIS

ALOPECURUS CAROLINIANUS

AMIANTHIUM MUSCITOXICUM

ARISTIDA LANOSA

ASCLEPIAS RUBRA

ASCLEPIAS VARIEGATA

ASTER RADULA

BIDENS BIDENTOIDES

CALYSTEGIA SPITHAMAEA

CAREX BARRATTII

CAREX FRANrKII

CAREX HYALINOLEPIS

CAREX TYPHINA

CAREX UTRICULATA

CASTANEA PUMILA

COREOPSIS ROSEA

CUSCUTA CORYLI

COSCUTA POLYGONORUM

CYPERUS ENGELMANNII

CYPERUS POLYSTACHYOS

CYPERUS PSEUDOVEGETUS

DESMODIUM OCHROLEUCUM

DIRCA PALUSTRIS

ELEOCHARIS HALOPHILA

ELEOCHARIS MELANOCARPA

ELEOCHARIS QUADRANGULATA

SENSITIVE JOINT-VETCH

YELLOW GIANT-HYSSOP

SHORT-AWN MEADOW-FOXTAIL

TUFTED MEADOW-FOXTAIL

FLY POISON

WOOLLY THREE-AWN GRASS

RED MILKWEED

WHITE MILKWEED

LOW ROUGH ASTER

ESTUARY BURR-MARIGOLD

ERECT BINDWEED

BARRATT'S SEDGE

FRANK'S SEDGE

SNORE-LINE SEDGE

CAT-TAIL SEDGE

BOTTLE-SHAPED SEDGE

CHINQUAPIN

ROSE-COLOR CORROPSIS

HAZEL DODDER

SMARTWEED DODDER

ENGELMARN' S FLAT SEDGE

COAST FLAT SEDGE

MARSH FLAT SEDGE

CREAM-FLOWER TICK-TREFOIL

LEATHERWOOD

SALT-MARSH SPIKE-RUSH

BLACK-FRUIT SPIKE-RUSH

ANGLED SPIKE-RUSH

LT E LP G2

GS

GST?

G5

G4G5

G5

LP G4G5

G5

G5

G3

G4G5T4T5

LP G4

G5

G4G5

G5

GS

G5LP G3

G5

G5

04Q

GETS

G5

G2?

G4

04

G4

G4

Si

S2

S2

S3S4

S2

S1

S2

S2

51

S2

S1

S4

S3

SX. I

S3

S2

S1

S2

S2

S2

S2

Si

S1

SX.I

S2

S2

Si

92

E

E

S

30 AUG 2004

SALEM COUNTY

RARE SPECIES AND NATURAL COMMUNITIES PRESENTLY RECORDED IN

THE NEW JERSEY NATURAL HERITAGE DATABASE

NAME COMMON NAME FEDERAL

STATUS

STATE REGIONAL

STATUS STATUS

ELEPHANTOPUS CAROLINIANUS

EPILOBIUM ANGUSTIFOLIUM SSP

CIRCUMVAGUM

ERIOCAULON PARKERI

EUPHORBIA PURPUREA

HELONIAS BULLATA

HETERANTHERA MULTIFLORA

HOTTONIA INFLATA

HYDROCOTYLE RANUNCULOIDES

HYPERICUM ADPRESSUM

HYPERICUM GYMNANTHUM

LEMNA PERPUSILLA

LINUM INTERCURSUM

LUZULA ACUMINATA

LYSIMACHIA LANCEOLATA

MALAXIS UNIFOLIA

MELANTHIUM VIRGINICUM

MYRIOPHYLLUM PINNATUM

NELUMBO LUTEA

NYMPHOIDES CORDATA

OBOLARIA VIRGINICA

ONOSMODIUM VIRGINIANUM

OPHIOGLOSSUM VULGATUM VAR

PYCNOSTICHUM

PASPALUM DISSECTUM

PHASEOLUS POLYSTACHIOS VAR

POLYSTACHIOS

PHLOX MACULATA VAR MACULATA

PHORADENDRON LEUCARPUM

PINUS TAEDA

CAROLINA ELEPHANT-FOOT

NARROW-LEAF FIREWEED

PARKER'S PIPEWORT

DARLINGTON'S GLADE SPURGE

SWAMP-PINK

BOUQUET MUD-PLANTAIN

FEATHERFOIL

FLOATING MARSH-PENNYWORT

BARTON'S ST. JOHN'S-WORT

CLASPING-LEAF ST. JOHN'S-WORT

MINUTE DUCKWEED

SANDPLAIN FLAX

HAIRY WOOD-RUSH

LANCE-LEAF LOOSESTRIFE

GREEN ADDER'S-MOUTH

VIRGINIA BUNCHFLOWER

CUTLEAF WATER-MILFOIL

AMERICAN LOTUS

FLOATINGHEART

VIRGINIA PENNYWORT

VIRGINIA FALSE-GROMWELL

SOUTHERN ADDER'S-TONGUE

MUDBANK CROWN GRASS

WILD KIDNEY BEAN

SPOTTED PHLOX

AMERICAN MISTLETOE

LOBLOLLY PINE

LT

E

E

E

E

E

E

E

E

E

E

E

E

S

LP

GRANK

G5

GET5

G3

G3

G3

G4

G4

G5

G2G3

G4

G5

G4

G5T4T5

G5

G5

G5

G5

G4

G5

G5

G4

G5

G4?

G4T?

G5T?

G5

G5

SRANK

LP

LP

30 AUG 2004

SALEM COUNTY

RARE SPECIES AND NATURAL COMMUNITIES PRESENTLY RECORDED IN

THE NEW JERSEY NATURAL HERITAGE DATABASE

NAME COMMON NAME FEDERAL

STATUS

STATE REGIONAL

STATUS STATUS

GRANK SRANK

PLATANTHERA FLAVA VAR

HERBIOLA

POLEMONIUM REPTANS

POLYGALA MARIANA

POLYGONUM SETACEUM VAR

SETACEUM

PRUNUS ANGUSTIFOLIA

PUCCINELLIA FASCICULATA

QUERCUS LYRATA

RHODODENDRON ATLANTICUM

RHYNCHOSPORA GLOBULARIS

RHYNCHOSPORA PALLIDA

RHYNCHOSPORA SCIRPOIDES

ROTALA RAMOSIOR

SCHOENOPLECTUS NOVAE-ANGLIAE

SCUTELLARIA LEONARDII

SESUVIUM MARITIMUM

SETARIA MAGNA

SISYRINCHIUM FUSCATUM

SPHENOPHOLIS PENSYLVANICA

SPIRANTHES ODORATA

STACHYS TENUIFOLIA

STYLOSANTHES BIFLORA

TIPULARIA DISCOLOR

TRICHOSTEMA SETACEUM

UTRICULARIA BIFLORA

UTRICULARIA GIBBA

UTRICULARIA PURPUREA

VERNONIA GLAUCA

VULPIA ELLIOTEA

TUBERCLED REIN ORCHID

GREEK-VALERIAN

MARYLAND MILKWORT

BRISTLY SMARTWEED

CHICKASAW PLUM

SALTMARSH ALKALI GRASS

OVERCUP OAK

DWARF AZALEA

COARSE GRASS-LIKE BEAKED-RUSH

PALE BEAKPD-RUSH

LONG-BEAK BALD-RUSH

TOOTHCUP

NEW ENGLAND BULRUSH

SMALL SKULLCAP

SEABEACH PURSLANE

GIANT FOX-TAIL

SAND-PLAIN BLUE-EYED GRASS

SWAMP OATS

FRAGRANT LADIES'-TRESSES

SMOOTH HEDGE-NETTLE

PENCIL-FLOWER

CRANEFLY ORCHID

NARROW-LEAP BLUECURLS

TWO-FLOWER BLADDERWORT

HUMPED BLADDERWORT

PURPLE BLADDERWORT

BROAD-LEAR IRONWEBD

SQUIRREL-TAIL SIX-WEEKS GRASS

G4T4Q S2

LP

E

E

-E

E

G5

G5G5T3T5

GST4T5

03G5GS

G4G5

G5?

G3

G4

G5

G5

G4T4

G5

G4G5

GS?

G4

Gs

G5

G5

G4G5

G5

G5

G5

G5

cs

Si

S2

S2

S2

S2

SI

SI

SI

S3

S2

53

S2

SI

S2

S2

S2

S2

S2

S3

S3

S3

SI

Si

S3

S2

91

LP

Lp

S

0

S6

30 AUG 2004

SALEM COUNTY

RARE SPECIES AND NATURAL COMMUNITIES PRESENTLY RECORDED IN

THE NEW JERSEY NATURAL HERITAGE DATABASE

NAME

WOLFFIELLA FLORIDANA

COMMON NAME

SWORD BOGMAT

FEDERAL

STATUS

STATE REGIONAL

STATUS STATUS

GRANK SRANK

G5 S1

128 Records Processed

J NNON-PSEG

*tte of ei JrstDEPARTMENT OF ENVIRONMENTAL PROTEk TONEnvironmental RegulationGoN r . ORN Office of Permit Coordination and Environmental Review MARKN MA

401 East.State Street zcting Co nP.O. Box 423 .

Trenton, New Jersey 08625-0423Phone: (609) 292-3600 Fax: (609) 777-1330

January 14, 2010

Edward J. KeatingEnvironmental Manager.PSE&G - Regulatory AffairsP.O. Box 236/N21Hancocks Bridge, New Jersey 08038

R . Salem and .... . ! . ..

RE: Salem and Hope Creek Nuclear Generating Stations License RenewalLower Ailoways Creek, Salem CountyEnvironmental Report

Dear M r. Keating ... .. ...

The Office of Permit Coordination and Environmental Review of the New Jersey Departmentof Environmental Protection (NJDEP) has completed its review of the Environmental Reports for the,:Salem and Hope Creek Nuclear Generating Stations License Renewal. We offer, the followingc o m m e n t s . ...

COMMENTS

.BUREAU.OFNUCLEEAR ENGINFERING

The BurIeau of Nuclear Engineering (BNE) will provide commentss directly to theNuclearRegulatory Commission (NRC) on the environmental :reports for the license renewal .ofSalem/Hope Creek nuclear generating stations within the timefrafme established by the. NRC forthe.Draft Supplemental Environmental hmpact Statement comment period ".

-BUREAU OF ENVIRONMENTAL RADiATION

The.Bureau of Environmental Radiation (BER) does not have regulations governing theexposure to 604Hertz electric:.and nagnetic fieldS.4 Similarly, BER does not regulate induced orcohtact currerits. What we do have is a guideline that states..that the electric field at the edge of"the right oway (ROW) should b no greater than 3 kilovolts per meter, micasured:at a height of i::.,meter. above the ground. This is a.-recommendatio-n adopted in1981 byf resolutiionof.theCormmnission on .Radiation Pr6tection. It would be advisable but not mandatory fiiat the utility"conductperiodicmeasurements alongROW's to document electric field leveIs.a.

Newl Jersey is an Lqiial (ppoquil .it .V,Enplqoyr,Pin r (nRcldilq.... , p,Y~nk 'I" /aNc' Pprad eic,bl

Regarding magnetic fields, at this point in time, the consensus among the scientific 9community is that there is inconclusive evidence to .suggest that long-term exposure to magneticfields from power lines would result in adverse health outcomes. However, for new or modifiedlines, many health-based organizations are still recommending reducing magnetic fields if low orno-cost options exist. In a June 2007 fact sheet put forth from the World Health Organization(WHO Fact sheet No. 322), the following guidance is issued: "When constructing new facilitesand deigning new equipment. . low-cost ways of reducing exposures may be explored."

Therefore, in light of such uncertainty, if thereare any future changes made:to the power deliverysystem that would lower theexisting magnetic fields from the power lines, it may be prudent toexplore such options. Likewise, if new lines are installed, it would be advisable to construct thelines so that magnetic :fields, at ground level are as low as reasonably achievable.

OFFICE OF NATURAL LANDS MANAGEMENT

From what is stated in the Environmental Reports, it appears that no field work wascompleted for these projects. It is unclear. as to whether a Natural Heritage Program (NHP) DataRequest was submitted to the Office of Natural Lands Management (ONLM).. The only thingincluded in the reports was a list of species generated from the ONLM county lists :(but perhapsreceived from the U.S. Fish & Wildlife Service). No copy of the results, of the NHP. data requestwas attached and the NHP is not included in the correspondence appendix, although a letter fromDave Jenkins (NJDEP's Endangered and Nongame Species Program [ENSP]) is included. Davestated that a NHP data request should be requested by PSE&G.

The only rare plant species mentioned as being on site is a population of swamp pink(Helonias bullata) which was reported as occurring, somewhere in Salem County where one of thepower lines crosses its habitat.. No potential, impacts or management plans are discussed (DaveJenkins points this out as well, and asks that a plan be addressed.) The source for this report maybe from U.S. Fish & Wildlife but it could be from the NHP as a letter from Herb Lord is cited .inthe references, but a copy of the correspondence does not seem to be included (hence ONLM'suncertainty as to whether a NHP datarequest was completed).

At a minimum, a rare plant inventory of the project sites should be performed and, if notalready completed, a NHP data request.should be completed.

Thank-you for-providing-the- NJDEP the opportunity to comment on. tile- Emronmental.... .. .......Reports for the Salem and Hope Creek Nuclear Generating Stations LicenseRenewal.

Sincerely,

BrianP. Quinn..Principal Environmental SpecialistýOffice of Permit: Coordinationand Environmental Review

C: Karen Tuccillo, NJDEPBob C.ari.ca. NJDEP.• .. . .:C .::iiK r l•T c i] •N D P . -•:::.;:: .i .:" .i.::i[.:i::.:.ii. :.. ': ..:i,"ii: .:/: :: :: ,: :.i : . :I .••.@ ..

VIA FEDERAL EXPRESS

SCH08 - 126

Mr. Frank SteitzBureau of Operating PermitsNew Jersey Department of Environmental Protection401 East State St. - 2 nd FloorTrenton, NJ 08625

Reference: PSEG Nuclear LLCHope Creek and Salem Generating StationsProgram Interest Number: 65500Activity Number: BOP080001Title V Operating Permit Renewal Application

. Dear Mr. Steitz:

PSEG Nuclear LLC (PSEG Nuclear) is submitting the enclosed application to renew theTitle V Operating Permit (Title V permit or the permit) for the Hope Creek and SalemGenerating Stations (the Stations). The New Jersey Department of EnvironmentalProtection (NJDEP or the Department) approved the stations' initial Title V permit onFebruary 2, 2005.

According to N.J.A.C. 7:27-22.30(c), to be considered timely, renewal applications mustbe received by the Department, and be administratively complete, at least 12 monthsprior to the expiration of the Title V permit. However, pursuant to N.J.A.C. 7:27-22.4(e)guidance, PSEG Nuclear is submitting this renewal application at least 15 months priorto permit expiration, so that any deficiencies identified in the application can beaddressed and the enclosed renewal application can qualify for an "application shield"pursuant to N.J.A.C. 7:27-22.7(b).. PSEG Nuclear requests that the Departmentprovide written confirmation that the application is administratively complete and theapplication shield applies.

Application Forms

The application forms used in this submittal were obtained from the NJDEP's AirOperating Permit Renewal Application Forms Package. These forms are included asAttachment I and are described in detail below.

Mr. Frank S:.itaftzOctober 28, 200& Page 2

Section 1 - Facility Profile

Section 1 contains contact information for PSEG Nuclear.

Also, Section I addresses the provisions for the Compliance Assurance Monitoring(CAM) plan. The United States Environmental Protection Agency (USEPA)promulgated the CAM rule, 40 CFR 64, to establish monitoring for "reasonableassurance of compliance" with Title V Operating Permit requirements. Based on theapplicability provisions of 40 CFR 64.2(a), the CAM provisions applies to major sourcesthat:

" Are equipped with pollutant control devices to comply with emission standards,and

o Have pre-control emissions equal to or greater than 100 percent of the majorsource threshold for a given pollutant.

No emission sources at the Stations are equipped with control devices and have greaterthan 100% of the pre-control device'emissions equal to or greater than 100% of themajor source threshold for a given pollutant; therefore, the Station is not subject toCAM.

In addition, Section 1 contains a statement of whether changes were made to theStation's Acid Rain Program. Pursuant to 40 CFR 72.6(b)(1), the Acid Rain regulationsdo not apply to the Salem Unit No. 3, simple-cycle combustion turbines (U39), becausethey were installed before PSEG's November 15, 1990 applicability date.

Section 2 - Application Certification

Section 2 contains a signed certification form.

Section 3- Seven-Day-Notice Chanaes

As indicated in Section 3 of the permit renewal application, PSEG Nuclear has notsubmitted any Seven-Day-Notice changes during the permit term.

Section 4 - Chanqes Made To Insignificant SOurce Operations

Section 4 of the application addresses changes that have occurred to InsignificantSource operations at the Stations. As noted in Section 4 of the enclosed application,changes to insignificant source operations IS108 have occurred during the permit term.

Section 5- Summary of the Results from Testing and Monitoring

Section 5 of the application contains a list of all stack testing, Continuous EmissionsMonitoring ("CEM"), and Continuous Opacity Monitoring ("COM") requirements in theperm Th scli-ctatTshte-a-chrre-meL.

Mr. Frank SteitzOctober 28, 2008 Page 30Section 6 - Compliance Status

Section 6 of the application contains the compliance status for all applicablerequirements listed in the permit. Each Subject Item is listed along with the compliancestatus and methods used to determine compliance. Please note that no complianceschedules are included in this section, because the Stations are in compliance with allapplicable requirements listed in the permit.

Section 7- Pollution Prevention Reportinq

Section 7 of the application contains Pollution Prevention Reporting information. Thissection presents the historical trends in pollutant emission levels at the Stations over thelast five (5) years. PSEG Nuclear has utilized information from its annual emissionstatements reports for calendar years 2003 through 2007 to satisfy the requirements ofSection 7.

Historical emission trend information for hazardous air pollutants ("HAPs") is notrequired to be submitted because the Stations' potential to emit any HAP is well below

* .the 10 tons per year ("tpy") threshold identified on page 10 of the instructions in theRenewal Application Forms Package. Based on the instructions, historical emissiontrend information is only provided for NO, and VOC emissions for units with potentialemissions over 5 tons per year.

Fee Calculation

Pursuant to N.J.A.C. 7:27-22.31, the base fee for a Title V Renewal is $125 per significantsource operation. Please invoice the Company for this and any other applicable fees. -

If you have any questions regarding this application, please contact me at (856) 339-2307.

Sincerely,

Luis CataldoEnvironmental and Rad Waste Supervisor

Enclosure

bcc: C. DeNicotaE. GormanT. HarlukowiczT. JoyceE. KeatingM. McLaughlinC. NeelyG. SueyJ. Valeri

ATTACHMENT I

Permit Renewal Application Forms

Section I - Facility ProfilePSEG Nuclear LLC

Hope Creek and Salem Generating Stations

Facility InformationFacility ID (BOP PI Number): 65500Facility Name: PSEG Nuclear LLC Hope Creek and Salem Generating StationsStreet Address: Allowav Creek Neck Road

Lower Alloways Creek Township, Salem County7

Mailing Address: PSEG Nuclear LLCPO Box 236Mail Code N09Hancocks Bridge, NJ 08038

Current Owner: PSEG Nuclear LLCCurrent Operator PSEG Nuclear LLC

Compliance Assurance Monitoring (CAM) Requirements

EPA developed 40 CFR 64 (Compliance Assurance Monitoring or "CAM") in order to providereasonable assurance that facilities comply with emission limitations by monitoring theoperation and maintenance of their control devices. In general, CAM applies to emission unitsthat meet all of the following conditions:" the emission unit is located at a major source for which a Title V permit is required; and" the emission unit is subject to an emission limitation or standard for a specific contaminant; and

" the emission unit uses a control device to achieve compliance with that specific contaminant'sfederally enforceable limit or standard; and

- the emission unit has potential pre-control or post-control emissions (of that specificcontaminant) of at least 100% of the major source amount (see 40 CFR 64.2 - "Major facility"); and* the emission unit is not otherwise exempt from CAM (for exemptions, see 40 CFR 64.2(b)).

To learn more about the CAM program, check EPA's website: www.epa.gov/ttn/emc/cam.html.After reviewing the information above, check one of the following boxes:

* NO, my facility DOES NOT have any emission units subject to CAM requirements.

D1 YES, my facility DOES have one or more emission units subject to CAM requirements and a CAM plan

is provided with the operating permit renewal application.

Acid Rain Program

Per 40 CFR 72.6(b)(1), this section does not apply to the Salem Generating Station, simple cyclecombustion turbines (U39),.because they were installed before 11/15/90.

Title V Renewal - Application Certification

PSEG Nuclear LLCSalem & Hope Creek Generating Station

Facility Name: PSEG Nuclear LLC - Hope Creek and Salem Generating Stations PI Number: 65500

Certification

Responsible Official as Defined in N.J.A.C. 7:27- 1.41. "1 certify, under penalty of law, that I have personally examined and am familiar with the

information submitted in this renewal application and all attached documents and, based on myinquiry of those individuals immediately responsible for obtaining the information, I believe that thesubmitted information is true, accurate and complete. I am aware that there are significant civil andcriminal penalties, including the possibility of fine or imprisonment or both, for submitting false,inaccurate or incomplete information."

As required by N.T.A.C. 7:27-22.9(c) 3 and (4)2. "1 hereby state that this facility is in compliance with all applicable requirements of the compliance

plan and that the facility will continue to comply with all applicable requirements of the complianceplan, except those specifically listed in a compliance schedule."

As reouired by N.T.A.C. 7:27-22.9(c) 6.i3. "I will ensure that this facility complies with the accidental release provisions at 42 U.S.C. Section

7412(r) and N.J.A.C. 7:31."

As required by N.T.A.C. 7:27-22.9(c) 6.iii4. "I will ensure that any architectural coating used at this facility conform with the standards set forth

at N.J.A.C. 7:27-23."

SIGNATURE

Thomas P. JoycePRINT OR TYPE NAME

DATE

PSEG Nuclear President and Chief Nuclear OfficerTITLE

Individuals (may include consultants) with direct knowledge of and responsibility for theinformation contained within this document as defined in N.J.A.C. 7:27-1.4

5. "I certify,.under penalty of law, that I believe the information provided in this document is true,accurate and complete. I am aware that there are significant civil and criminal penalties,including the possibility of fine and imprisonment or both, for submitting false, inaccurate orincomplete information."

SIGNATURE DATE

Luis Cataldo Environmental and Rad Waste SupervisorPRINT OR TYPE NAME AFFILIATION - TITLE

Section 3 - Summary of 7-Day NoticesPSEG Nuclear LLC

Hope Creek and Salem Generating Stations

No. jDate of 7-Day Notice IBrief Description of Change

No Seven-Day-Notice Changes were submitted during the permit term.

0

Section 4 - Changes to lnrcant Source OperationsP'SEG Nuclear LLC

Hope Creek and Salem Generating Stations

Estimate of Emissions (TPY)

IS NJID Source/Group Description Equipment Type Location (ITo~tal) NOx CO S02 I •, I PM-10 (Total) (Thta

IS108 (17) Mobile Lip hing firing diesel oil (<iNMlBtulkuel Combustion Equipment(OiherF 0.2 2.3 0.5 1.2 0.2 0.2 I

Seclion 5- Summary of the Results from Testing and MonitoringPMEG Ntciear 11C

I irpe Creek ata Saleo, Generating Satiaons

Subjectitem li ef# Appliableleqireorent Monitoring Requirement Reoordkeeping Requirement tubnriital/Actrio Requirement N

CO < 251 rpovdi,'ad 15% 02. IN.J.A.C. 7:27-i6.9(b)] CO: Mit itorld by sak emission Testing at tire apprroeed CI Reco>rd beping ay slec taM resolt T at the riprr'ed Reak lest - 5urlto proirteol ,,orieci a test ad.lata rerarit:fIreqency. frequency. See U113 OSSoSummary Reelrence oumb2ers62 As re, IThe appearead scichedule. See U39, 05- Sumnmary

U 39 O-qJ 4 See U39, OS Sor.,oaoy oRef,,teme nonobes 26 tlrough 33 for through 33 fhr recerdkeeping rotorerments. [N.J.A.C. 7:27- Referezice onumb.is' 26 Ihlorgli 33 fIorsa dritill Xstack taess details and monitorrng reqtuirements. [N.i.A.C. 22.if•t6l rtruoementt. IN.).A.C. 7:27-22162(t,)7:27-22.16(.)]

VOC (Total) - 50 ppmvd 515% 02. 0N.1A.C. 7:27o6.9(c)j VOC (IotaI:nloreaTd by sck emission testintg at tire VOC ('otal): Reorotdkelping by slack lest restull ai he lackt Test - Subril prortol, co ndutct lest and subaait •esrtts

UN C9 * 5proedl felrsirtuency. See 139, OS uomary Referene aipprowrd frequency. 1- O39,OS Suommary Rcfetrence As per th-e pp-rrrd schedule. See U39, 05 utrtoerVnu mlbers 26 tlhrough 33 f slack tests details and rlolort d o g nrbers 2o 1r1grt 33 for roeorketaping requhrrneols. erncTe n brrotlrs 26 ihirough ti r rsu.1t irerireaotts. JN.IA,C. 7:27-22.l16(o)I IN.J.A.C. 7:27-22.16(o)J reqrireenrts. .N.J.A.C. 7:27-22.1rr(oel

NO, (fToal) -=1 lI/bMIBTU. Limit NO, eotssion rate NO, (laotal): Monilred bt slack emission testing at thee NO (Totlal): ReRrotkt,,iping by slack lest restlls alire Sltack esl - Submit protocol, caonduect test And submit Ireslls:base•-oNOx Emissions Averaging Plano. N.J.A.C. 7:27-196( epptroved fre-luency. approved frecTuency.S eeU39,OSStmary Reference As per theappred sheirdule. seeI f139, 0SS-ma

U3)1 ('991 ii Se0U39, 05u Snuary Referencenumbers 27 through 3f Ter mmbeý 27 thlio it 34 for rortkeeprog eqrireetneu. Raererrnttonlrs 27itrougl3ifart ttlai Xstack tess detailsa and moitriting, retluirements. (N.I.A.C. (N.S.AC. 7:27-22.16(i)l requirements. INJ.AC. 7:27-22..16i1l;':27-221.16(o)J

NO, (' otae) =l405Ib/iht. kieeitram otossion rate frowm NOrI (Totl): oontrord by slack emission toettog at the NOs (T|orail: Rfeordkeepinrgiry stack leaf rosesus at Tile Slack 'Peel - .i..... protocol, fallrtat Iert aatdu sbti r•satlf:

0 39 O5, 2 apereting permit aplrlicaliol. IN.I.A.C. 7:27-22.16(a)J aIroved fleqreney. Bee [U39, OS Sammarty Meleteice .p...o.edt frequency. Please see, U39 OS Summarv As pet tire ai.ovedI sdiolie. ile-se h tat' 39, OSW90 Sunmatvounubersa 26 through 33 for stick teNdetails and rornihattriog iefetente Nuobre, 26 thirogh 33 for roeord keopirrg Rfcte...... Numbeis 26 lltotglt 33 fiuttsubritteairtquirement,. [N.J.A.C. 7:27-22.16(.)] retquirements, IN.J.A.C. 7:27-22.16(o)] eou trmls. NJA.C, 7:27-22.16io)]

)CO -= 2-20 It/hr. Mkaimorem eissirtn tale 1,flor operatingr (0: Monitored by slack e risstion sting at tire rppred C0: Recordk-taping b, stak test retllts prior to permit Stack lest - Submit protocol, aondit tusd ear rnd sulbilremnitI:

U 39 Os r permil application, IN.J.A.C. 7:27-22.16(a)I frequency, Mleasesee U39, OSSuemrr- Reft--erenetosrs rio e 'ew v .Pieaseo st U039 OSSuormaorvReference Nomhers As per ihe appuroed srhedrle. Piesese'. U39, 0526 ihrrargh 33 for monitorinig r taireme.nts. (N.I.A.C. 7:27- 26 through 33 foorre dkeping rattr iremtute s. IN.J.A.C. 7:27- Smrorray efereoce Nuotf1s- 26 through k3 far surbmittalc2216(o)] I2216(.)] ecpqairernerLs. (N.1,A.C. 7:27-22.-16(.1

'VOC (lla|) -= 27.5 Ib/hr. Maiomum emission rate from VOC (1 otal): M onitoartd by slack emristion testing at tlre VOC (iotal): Rt-ordikoteping by steck est results prior to Stack 'lest' Submit proltocol, conducl tesl and subit -Itesul:eatfiteing pertil arplricatiin. INI.A.C. 7:27-22.16(a)] airlprto i Iteqtat, i'ieaee see U39, CltaS nay permit ra ci. Please e 9, CS Summary Reference As per tieriapaat'l scheciule.

U39' 135 4 Roft'ereneNutrteer2

6tharteugh33fiorrrooitoring Numhets~a2btiUtraugi33 far tracraradkepiog raertiremtantl. :pl'easesee 039. OYSSrtaoary, Sa'erertenNutobers 26 3

realuireoenrtl. N.J.A.C, 7:27-22.1(afa)l (NJ.A.C. 7'27-22.16(o)] through1 33 for stbilittal requirements. IN.i.A.C. 7:27-22.16,(o)l

N70 Iand) <[ 41, lb/br. - rlesioreor eteieiaor raite f(roo NOx (latal): aMonitored b slack moission tetin; at tie NO, f( ratal): Recordktrepiog by steak test restults p tr ior lk tost - SabmtalrS l it proto, coldauct test and sulmil trasai:[39 02 2 eperating permit applicaetn. IN.J.A. C 7,27-2216(a)) roed freqpeen'y. 'lease see 39. Summa ermit ,.,ewao- I'lreoe U39, OS Summary Reference ke per iit, pprcedwo0hedule. aoleae see 1-U39, 0'ee

Refereaco Numleroa 26 througb 33 frar slack tests detail, and Nualrri se 26 throaughI 33 for recordkeepiag reritremetls. Strotemary. ieierereo Nurtretds 26 lthtuagb 3. far tsei'tlalaatnilturitg requirements. [N.J.A.C. 7:27-22.16(u)] (N.JX.C. 7:27-22.16(.1 reqoitereents. IN.J.A.C. 7:2

7-22.lb(ta)J

CO = 239 lb/hr. Svieirnteto emrission at, te frnroptagerating CO: Monttored by stlek eoasOsi testing at tlre ipprlveld CO: Rcerdkeepr'g b.. s[ack testeraullt prior to permit Stark Peel - Subibtt praotocol, Cordit test and butr t a' irells:

U39 0'32 3 permitapplicationa IN.1,A.C. 7:27-22. I(a)] lrroa'uec'.,. Pleaase see 039,CIS' Summarry Refeer re'eNobets Asper li th iteati oedrede, Pleasesee NU39,0 SNuattrlo's 26 tlmoughr 33 for stack tesls details and 26 through 33 for retcrrdkeepinrg req u irements. IN.J.A .C. 7:27- Sattmar.) Refea. e-e Novrle',rs 76 ITararlah 13, bla srbmittalaItiitortnr requirements. [N.I.A.C 7:27-22.16(o)l 22.16(t,)] bireqeilements. IN.I.A.C. 7:27-22.16(o)l

VOC (Toltal) = 27.5 lb/5r. Ibiaoaximuo etissiona rate trn VIOC (frktal): Maonitored Iy sltack err•.eioo testing at tire VI0C (1 1.ra1): Rs'ordikee-kipiag by stk test ersults prior to Slack est -Submit pratorol, conducl let tlan rarlmroit r-sarlte:U 2 opraltir peroriteppliaion. IN.I.A.C. 7:27-22.16(e)] eppcerod trequency. I least yle U3

9,OfSSa erary permit renewal. I'leas'e see U39, 0'5 5u2oroar), Refereanee As per "iu aapparsod shedeutile. ileasese 0U39, 05

39 2eleetc Natotrt'6 throgh 33ier sleek lasts dieliis aaai Nunrsor 26 thlrtoag 33 tart reerikeepiarg prteftests. Slattary, Reireare e Naoubers 26 IbhArgif 33- ... srmitlal

o itaratalt reslltttremet. [N.J.A.C. 7:27-22.16(t)] IN.I.A.C 7:27-22.16(o)1 eriuiremoeta. IN.J.A.C. 727-22A.16(,,)]

"15P <= 28.8 bi/ilt. Malinno em Lisslon rate from pe ting I'V: bMonitored be lack earaselor leeftiing prior 10 porritn 111'p: R-eoedike,'piang by slck tori treultsl prir tlar peromit Stalck 'Pest -Surbnoit rottt-tn, c.....rtbu tele and submit r-osral:permit application. IN.I.A.C. 7:27-2Z i6(alj tettes'l, based ooeabch of Tihree i'tpatloseet laldaae.d slek retne-1a. (SlJ.A.C. 7:27-22.i6(o)l As per the approedr sheduile. Stlrbnitta statk tes•I Iroatol

tests nu. feseseo U13 OS Sutmmar Refoerece Nutoiors to bhe Buiratte ra T''hoicaJ Services (BilS) at PO BRa 437,26 through 33 for tack test detail, ari eon itoring T'renton. NJ 08623 seilia 35 v otitaath frr'rTo thre ofae olrtilisroemelt (IN.iA.C. 7'27-22.1( .o) appreveial tir ahrvrratling tlt nait. WVitlin 31 ais 'A probx,"I

approval i, tIhr•merille.omust coaltAl If", at f;l530- 111 Irechtodirre a nrlrlatily aecoielbla'~ tesI dalte '1Iha stack testreprort latte Lot suabaor'led tar B'I5 telitrn I5 days 5terll

U 39 0-52per arr'g teethe tak Test pursuant to N.J.A.C. 7:27-22.19(d). x9 2Me test re•slla. .. st Ibe, cetiftied by a Nee Jersey licented

prhclroi ralrengiatertar ecer tified rndllsttei iaehgit'st'.A copy rf lhe test aesrailLt omut be sabtrilted rith dtetprelatpg peirntrenewal appliliatior data: Mi 10'ast 12 aotntlsprier to esxpirelaltr of tiar Oloeralittp, l'elttti.

l'est restall shall refran it SP (Ires/hir). NI.A .C. 7:2 7

-22.if8(eland. IN.J.A.C. 7:27-22.16(,,)'

iSP- 13,49 lb/hr. IN.J.A.C. 7:27-4.2(al1 S11': Moutniteo t 'ackee iotestirgaupon request af The 1-l3: Rlcordkeepingby stack lest tesultupotnr aquesitf the None.U 56 050 6 Jýoprireparr tert, based on heua pe raot finree tests. INM.A.C. Depertenrt. (N.J.A.C. 7:27- 4.4(fa) X

7:27- 4.4(a)]

Os (T'otal) =4.5 lb/k r. IN.J.A.C. 7:27-221 NOx (I otal): Monittored by stack emissionr testing once NO, (Iolei): Recoid keeping by stalk test rilts once None.U 56 051 3 iritil co oeri'ally a ad er ts 5 e arts, based 68an tltllt perhio. inritieli enllaid aveiy 5 'ttai. INJlA.C. 7:27.22.16(,I1)e

[N.J.A.C. 7:27-22.16(a)1NOx (l•'rcl) -= 0.06 Ib/MM1iB TU. IN.I.A.C. 7:27-221 NO, Tolal): Monitored hi' stock e'mission testing tatr NlOx (Total): Recruadkeeping ie stack tesiresults once Ntone.

U156 OSl 4 initially and every 5 yearc, based an any 60 minurte petalasi. nitialiy an ely 5 yaaate. IN.i.A.C. 7:27-22.tb(eII 3[N.I.A.C. 7:,27-22(,1 a)l

CO "3 lb/hr. IN.J.A.C. 7:27-22 CO: Moniotred by stack emission letiog 06ce ioitially atari CO: RIesordakeeping by stuck ted est a utes o.ce iinitially and NIte.0 56 CI9Iv 5 ry 5 years, based oa, anyt Wrinntt period. [N.I.A.C. 7:2

7- ,ery 3 yeats. [N.I.A.C. 7:27-22.16(a)I X

22lf6a~al

.02

I klpe Cteek tad Salemr Gcrent althg Staititns

Sable I•l-n, lle6 # Applibalýe Rlequienl Monilntinig iequir........ Rer-rdkeepVig Requi. .t rubnriHal/Aciana Rlequintetrl y IN

CO - 0.0.39 lb/MMl3 'U. IN.J.A.C. 7:27-221 CO: bltiitlred by Mlack tission I1th ettite initialiy atid CO: RlI' ,lk-eelling IY' clack iest resuil s 01-c iitially atIad Ncn.U 56 01S 6 ee-r 51 1 yeats, based en any (3) fltie beriod. [N.I.A.C. 7:27- eye 3 ,,:ears. JNJ.A.C. 7:27-22.16(a)j X

22.16(a))

VOC (I' ola) -< 0.75 lt/hr. [N.I.A.C. 7:27-221 VOC (folal): M nitntI bhy t.ak ieisio ie'iiVOg once \OC (Toal);Rctrd keeeping by fuack tesl1,, eats otnte Noe.U56 0i 01 7 tatty ad ea 5 tears, baed ot aty 60 mi te peritdL inilitlla' and e.... y ' cvar. [N.J.A.C. 7:27.22.16(a) x

[N.J.A.C 7:27-22.16ka)[

VOC Tota) <- 001 Ib/itINlifIO. N.J.A. C. 7:27-22] Of (l'Ot): \ltiltrct Iby lack enti aioat esing onte VOC (Toidl): RIt'ct'dkeping lit slack it. ,es.11t .it ic.1.156 03) 3 inttially adevey 3 yeate, Icteti an at)y 6 b ndite perio.d initially and every yearsv NJ.AC. 7:27-22.16(a)[ X

[N.J.A.C. 7:27-2,16(,)1

" S1 a- 1.1 lbi/hr. [ JA.C. 7:27-221 ISP: itrittittel by stack i-tttiitessitting ott. iniittitly and ISP: Rltattdkeeping br slack tent resualt, once i ,ndally a M, N-n.U 56 C-6 9 evt-ery 5 yart, 1atd t- any 6( tttrti ptiote. INJIA 7:27. -ee)'t ye-is. JN).A.C. 7:27-22.16(,a) x

22.16(a))PM-Ilt (fatlM) <= 1.24 Ib/hr. IN.I.A.C. 7:27-22.160,(.) PMt10 (lItal): Motitoril by stack ettision '. ttliitttecce PI'l-Il) liltalt: R-,,rdkteli ng by stack lest tet'ttis nrltc None.

U 56 O31 13 toitirlly and evea)t 5 yet.un lamed on an) fit, niintte peai. inilially atntt every ), year. JNJ.AC. 7:27-22.16Na)l N

CO -= I(Mt pp ..tid 7. 02. 7O N.J.A.C. 7:27-16.3t) CO: .Ntittttd by stack e tinsion testing ntite |itilall anid CO: Retnrdkeepin g bI slack "ent rtlts, ',s initialtly. ttttI Ntie.-a.t--.ey its, Itvaed aty alit ac".; - i t, ttee I-tihot1 t-s(s. tetvy 5 yeats. Ilelkr d I c ak Ic ..leg .eaa .entis lih Ilti

0356 031 12 Rcer to clack teling r•,luit..r.e.nts in this p-ritt I NJ.A.C. 11r-it. IN.J.A.C. 7:27-16. b(a)2X

':27 l.27(a)2'

VOC (1Ttal) < ) p311 prvd 07% 02. [N.I.AC. 7:27-16.(b)(1 VOC (Intal): Molntitoed b) ty sack einsioin tleling ri VOC (Idofa)): Ret-rdkle-pint I• sitck t as l anft a'. Naerte.

U 36 051 B ritially and ee'y, S -ears 'ased w t ' the ave-lagc ef tiee o -o iitially and eaty -i iears. IRiet lto lack lesteitgIton teal. Rtdt'i lasltck titling tstuitrneni,-,it thit in•rnit iquiiterantntt in fits prit. [N ].A.C. 7:27-16.11([a)21IN) .A.C 7:2'-16.231(a)21

NO, ('10,tal) : 0. 12 3b/MKIt I U. [N.J.A.C. 7:27-I1 .7(b)1 NO, ( ' d t)) Tlitted iy sback e1n isiti, testing oice NO, ('isl.A): RIecolLrdeetping dck 'esl restlisinice N"ttne.

U 5t OI 14 in.tlalt' -ita atery eaisy latea it (be aivetrage iof three 1- initially and cetry 5 yat-arc. Pceft tlit ack ttsliitgIttstt fr ests Ilctr l akik tetitng tenitttnen in this p-enit. ttlairetennl in this pe'tit. IN.lAN C 7:27-19.1,(a)21IN.TIAC. 7:27-19.15(a12

NO, (IToal) -=4.S It/ht. IN.J.A.C. 7:27-221 NO\ (Ic'ota \:aMoit-re)l by stack enieeitn testing nce NO. (total): R-cedtkieingt by stack test testits aonc Nec-,:.O 56 CeY2 3 nintt nI eey 5 year. 5 arc itt arty 63 tinttte perit, i.nitiallc and ,ietr) 5 t'. tN.J.AC -7:27-22. 10(a),

N)J.A.C 7:2i-22.16(a))

NOc (Ilial) - 11.06 Ibl/k MBIRU. [N.).AC.7:27-221 NO\ Trotal): Monititili Itackteiiit aeliitg btti NOl, )Totla: Rec,-tdkeeping by stack tl,,l estltone Niite.1156 032 4 rintialbt ' tad aeer, 3 )'ett. lr• 3- e en ary 611 ninitte peria,. inilially and-a y 5 y--eat ItNJ.AC. 7:222. 16(a)l X

I ~[N.J.A.C. 7:27-22.16(a)l

CO < 3 Ib/ihr. IN.[.A.C. 7:27-221 CO: Monih-rsd by ltack eniii tciting ce initiallyatnd CO: R•_st'ralkeeping by lkack Ic-st e'aualetiten ittilially and Nitne.U 56 032 5 eier

y 5 trats, med ttt any ) hnitute peri(ed. [N.I.A.C. 7:27- i-try - yers, IN.J.A.S'. 7:27-22.16(a)1 X22,16(,)l

CO - 0.039 lb!MllB I U. U N.I.A.C. 7:27-221 CO: MoStett I by li ack 'nsit i tisling -nc initially nd CO: byaaribeetiiig by slack let rsesultm (ti initiilly ald -Nt.,-U 5i 02 6 e-ery 5 yetara Iasea 'I t t.t. l ititt ite p-eil. [N.J.A.C. 7:27S - eer, 5 yeats. [NI.AC --27-2211ta)

22.16(a))5'C ('otial-) -< 0.75 Ib/lin. IN.J.A.C. 7:27-221 V01 ( LA) Monittred ba sltekeatieniot teting erce SOC )'hitall: Riailtn eepttg i staltk Itresltsa otc N-otite.

U156 OS2 7 IV(ilit' att ei ct )'at a 5 ae4- itton anty 63 ntintte pvt eid. initialiy ant e-ey 5 yeatr. [NIJ.A.C. i27-22.16(at) XIN.J.A.C. 7-.27-22.t6(iol

- -VOC (Fctal) c 30.011 A,/tIKll I U. INJ.A.C. 7:27-221 VIOC (AaI ltt tei Iy slick eission e teting tite VOC (l'otal): byRettkeepiig y' stack tl esi eell tioe No-i.U 56 fY2 8 initially and r tevec 5) 'ears, cited ett atn {in t te 1-eti. inilially ani eey 5 -ar- INJA.C. 7:27-22-16,a)] '

_N.NIA.C 7:27-22.16(a1)

13' 1.1 lb/hr. )N.J.A.C. 7:27-221 PI' \itittit't!d by 1t.,,k etin tIst-ing rae- initially and ISP: R.ec..t..k.t' 1 ping bei, li l•ck restst ottne inititl"t and None.U56 O02 9 eey i i'are. b&ea it tty 611 y te (4nn ri -- nit. IN.J.AS.C..7:27- .. aer.y 5 ears. [N.IA.C. 7:27-2'116(,o] xS2.16[aI)

'M- ll0 (ieall -= 1.24 Ib/hr. )N.I.A.C. 7

:27-22.16(a,) t-I lit l)t Monitored by slack e'itk tsttit oic . 'l-Il I i'tlal): RItclkeptt It3 click Ist test aesultice NaitN .0 56 032 Ii initiallt and etety 5 c-ets, baietd it any 60 niitiae periel. iitially and e-ety 5 yeat. [NJ.A C. 7:27-22.16(a)) X

C -I00 ppmvd113 tci 7%, 02. )N.I.A.C, 7:27-16.8(b)21 CO: Monihtald by sttk ettittion tattitg otce initially aed Cf3 R3aodlkeaping by ltak test tesnlts oice intially ail Nite.U 0S2 12 cevery5 yetits iaseid on lbie aieratge it- I5ree- 1-httii lers., net(r- 1 yeats. ei'ltt lit click reel itesliirti tthtetten t itt on

0356 Re 12er iclt c sta -i tesing ,eqttic-r iert.e tst in lthi tnit. [NJ.A.C. prrnit. [NJ.A.C. 7:27n16.1(a)()21

7:27-16. l1(a)2]1 VOC 5 ftal) <= 511 tvd R. 7% 02. IN.)A.Ci , 7:27-1 8(b)lt I VOC 501(,tal): Moititted by setak e statiettincaiig ticme. VOC (lilal): ItR.etdknpihr bya sltak 1,1I it'cal Rs iitte NLtie.

U 032 Ini alt ecera 5 tc:, iae tilte aterage 56 Ihtee I- itilially ait eerc:cears Refee t.ta.-tck r"slingIhar It. Refer tltaeck tIcslig ireninmentf in |hi- 1,-•-nt. reqniiireoe int ttt petiLt IN.[.A.C. 7:27-16".2()2lN.I.A.C 7:27- a6.2(al)2

Nf, (l'alalI) <'- {,12 itylaill 10., [N.).A.C. 7:27-11,7()1-) Na). I ibtlal): Monitotretl ha elack e'ari~siitta eteitiegtacte NO\c )1 atial): Ilasarikeniittg lic clack lesita-saults once Noittt,

U06 1S2 itttialie int eatrti t aearsIced it t' acerage 5 titee I0- itti)ially atld -e', y5 It-at, Relel ate lack leerWingi•ir It eeLP Rlet rt, slack l'sUing retuhtirente in thi, a p" ..bit,1•.e!netls in dais iernrt. [N.1-SC 7:27-19.15[a12[ S[N.J.A.C. 7:27-19.15(aa)2) __ __

Page 2 af 2

Sertiorr 6 -Comr pliance start,PSFiG, Nulear iC

Ittrpn Cr-1k a.,d ,Sn Gsnevrting Stdtiom,

Compliance Status Method to [, a ComplianceRef # Applicable Requirement Monitoring Requirement Recordkeeping Requirement (In Compliance Determine Schedule CommentsNee-Co-nitan-) Coeplincee Attached? (Yes/No)

General Provisions: Defines numerous terms used in None. None.N JiAC. 7:27, Specifies procedures for makingconfidentiality claims, certifying applications, reports.and other documents to the Department, and

FC 1 requesting adjudicatory hearings and stays of the In Compliance Not Applicable Noeffective date of departmental decisions. Also.

provides provisions regarding applicability,severabiity, and liberal construction of N.J AC. 7:27._N.J.A.C. 7:27- 11Control and Prohibition of Open Burning: Prohibits any None. None.person from open burning of rubbish, garbage, tradewaste, buildings, stucbrres, leaves, other plant life and

FC 2 salvage. Open burning of infested plant life or In Compliance Station Records Nodangerous material may only be performed with a

permit from the Department. [N.J.A C. 7:27- 21

Prohibition of Air Polluion: Notwithstanding None. None.cmpliance with other subchapters of N.J.A C. 7:27, noperson shall suffer, allow, or permit to be emitted into

FC 3 the outdoor atmosphere substances in quantifies that In Compliance Station Records Noresult in air pollution as defined at N.J.A C. 7:27-5 1.

Apptinable to all facilities located in New Jersey.IN.J.A.C. 7:27- 51Prevention and Conbtol of Air Pollution Control None. None.Emergencies: Requires that written Standby Plans.consistent with good industrial practice and safeoperating procedures, be prepared for reducing theemission of air contaminants during pedods of an air

FC d pollution alert, warning, or emergency, Any person In Compliance Station Records Noresponsible for the operation of a source of air

contamination not set forth in Table 1 of N JA.C. 7:27-12 is not required to prepare such a plan unlessrequested by the Department in writing. [N.J.A C. 7:27-t2]Emission Offsets Rules. [N.J.A C. 7:27-18g Other: When applying for minortsignificant Other: When applying for minorlsigniticant

modification, demonstrate compliance with this modification, demonstrate compliance with thisPC 5 applicable requirement which may call for specific applicable requirement which may call for specifc In Comonitoring and/or recordkeeping activities. IN.J.A.C. monitoring andlor recordkeeping activities, [N.J.A.C. mplance Staticn Records No7:27-18). 7:27-18).

Emissions Statements: Submit an annual emission Other: The emission statement will be based on Other: The emission statement and all suppedingstatement (it required) electronically to the NJDEP by monitoring, recording and recordkeeping of actual records shall be maintained on the operatng premises Station Records ofFC B May 15 of each year (or by mutually agreed upon date. emissions, capture and control efficiencies. process for a period of five (5) years from the due date of each In Compliance Annual Emission Nobut no later than June 15 of each year). )NJ.A.C. 7:27- rate and operating data for source operations with the emission statement. [N.J.A.C. 7:27-21], Statements21) potential to emit certain air contaminants [N.J.A.C.7:27-211,

Compliance Certification: Submit ancoal comptiance None. None.certification for each applicable requirement, pursuantto N.J.A.C. 7:27-22.t9(f). within 60 days after the endof each calendar year during which this permit was ineffect [N.J.A.C. 7:27-221

Station Records ofFC 7 In Compliance Annual No

ComplianceCertification

Prevention of Air Pollution from Architectural Coatings None. None.FC 8 and Consumer Products. [N.J.A C. 7:27-231 In Compliance Not Appticable No

PC 9 For equipment subject to NOx Budget Program. Other: See N.JA C. 7:27-31. [KNJ.A.C. 7:27-31). Other: See N.J.A.C. 7:27-31. )N.J A.C. 7:27-31). In Comptiance Station Records Nocomply with N.J.A.C. 7 27-31. N.J.A.C. 7:27-31)

or gIO

I-F,(, 0 11 C

Copfliance Status Method to I- a CorptianceRot I Applicatfe R ereent Monitoring Requi'rement Recordiureepfng Requirement In ComplIarre Determine Srhedule Comments

.Nos-Carpsla.n.e Compliance Attanlhd? (Yet/No)

Ally operation of equipment which causes off-property Other: Observation of ptant operations. {N.J.SA. Other: Maiotain a copy of att information submitted toeftects, including odors, or which might reasonably 26:2C-tlhe)] the Department, IN.J.S.A. 26 2C-19(e)),result io citizen's complaints shall be reported to theDepartment to the extent required by the Air Poltution

FC 1t Control Act. NJSýA. 26:2C-1 9(e). {NJ.S.A. 26:2C. In Comptiance Station Records No19(e)]

Prevention of Significant Deterioration (PSD) [40 CFR Other: When applying for minonrsignihcant Other: When applying for mioorlsignificant52.21 modification. demonstrate compliance with this modification, demonstrate compliance with this

FC 1, applicable requirement which may call for specific applicable requirement which may call for specific In Compliance Station Records Nomonitoring andcor recordkeeping activities 140 CFR monitoring and/or recordkeeping activities. 140 CFR52.21). 52.21).

National Emission Standards for Hazardous Air Other: Comply with 40 CFR 61.145 and 61.150 when Other; Comply with 40 CPR 61 145 and 61.150 whenPollutants (NESHAPS) for Asbestos. conducting any renovation or demolition activities at conducting any renovation or demolition activities at

FC 12 the facility. (40 CFR 611. the facility. [40 CFR 61]. In Compliance Station Records No

[40 CFR h1]Protection of Stratospheric Ozone: t) It the permithee Other: Comply with 40 CFR 82 Subparts A, B, ., P. Other: Comply with 40 CFR 82 Subparts A, B. E. F,

manufactures, transforms, destroys, imports. or . andG. [40 CFR 821. and G. 140 CFR 821exports a Class I or Class ft substance, the permiotee isscibject to all the requirements as specified at 40 CFR82, Subpart A: 2) If the permilee performs a serviceoni motor "fleet" vehicles when this service involves anozone depleting substance refrigerant (or regulatedsubstance) in the motor vehicle air conditioner(MVAC), the pereittee is subject to all the applicablerequirements as specified at 40 CFR 82. Subpart S. 3)The permittee shall comply with the standards for

PC 13 abeling of products containing or manufactured withozone depleting substances pursuant to 40 CFR 82, In Compliance Station Records No

Subpart E. 4) The permitter shall comply with thestandards for recycling and emission reductions ofClass I and Class It refrigerants or a regulatedsubstitute substance during the service, maintenance,repair. and disposal of appliances pursuant to 40 CFR

conditioners (MVACs) in Subpart 9 5f The permitteeshall be allowed to switch from any ozone depletingsubstance to any alternative that is listed in theSignificant New Alternative Program (SNAP)protnulgaled pursuant to 40 CFR 82. Subpart G. 140CF R 821

FC 14

Deviation Report: In accordance with N.J.A.C. 7:2i-22.19(c) and 22.19(d)3: the permitlee shall submit tothe Department, on forms provided by the Department.a certifed sixemonth deviatiuo report relating to testingand monitoring required by the operating permit, notincluding information for stack emissions testing orcontinuous emissions monitoring which have otherreporting schedules specified in the permit (normally,stack test report is submitted within 45 days of testcompletion and continuous monitur reporting is donequarterly) Pursuant to NJ.A.C. 7:27-22 1 g(e), the snt-month report must address other specified monitoring,including continuous and periodic monitoringrequirements found in column 2 and 3, entitled"Monitoring Requirement" and "RecordkeepingRequirement," respectively,'of the Facility SpecificRequirements section ofthis permit. These six-monthreports shall clearly identify at deviations from

probable came of such deviaticts, and any correctiveactions or preventive measures taken, If no deviationsoccurred. tIre report should say so. Any "None" listed inthe Submital/Action Requirement in the OperatingPermit is not intendded to override the sio'morthdeviation report. [N.JA.C. 7.27-22.19(d)3. N.J.A.C7.27-22.19(e). and [N J.A C 7:27-22.19(c)]

lone. Other: Ithe permittee shall maintain deviation reportsfor a period of five years hrom the date each report issubmnitted to the Department. [N.J AC, 7:27-22. 19(a))

In Compliance Station Records No

Page2 o2B0

Section 6 - Connpliance StainfsPSEG Nuoloar 1.1C

HoapeCrnk an d S . le Ocn -rarting Shtaions

Compliance Status Method to Is a ComplianceRef# Applicable Requirement Monitoring Requirement Recordbeeplng Requirement (in Complianoe Dsteretin Schedule CommentsNn-Compiantco) Comtplince Attached? lYes/No)

0 person shall corbust used oil except as aulhorized None. None.pursuant to N.J.A.C. 7:27-20. [N.J.A,C. 7:27-20.21

FC 15 In Compliance Station Records No

Prevenoion of Accidental Releases: Facilities Other: Comply with 40 CFR 66. [40 CFR 6861 Olher. Comply with 40 CFR 68. (40 CFR 668.producing, processing, handling or storing a chemical,PC 16 listed in the tables of140 CFR Part 68,130. and present

In Compliance Station Records Noin a process in a quantily greater than the listedThreshold Quantity, shall comply with 40 CFR 68. [40

PG3 1 No Additional Applicable Requirenments, [N.J.A.C. 7:27- None. None. In Compliaece Not Applicable No__________ ______22. 16(a)]FG7 1 No Additional Applicable Requirements. [N.JA.C. 7:27- None. None. In Compliance Not Applicable No22.16(a)i

Sulfur Content in Fuel: If the tank contains distillate Sulfur Content in Fuel: Monitored by review of fuel None.fuel for use in Salem County New Jersey (Zone 5), the delivery records per delivery. The permitiee shallmaximum allowable sulfur content is 0.3 percent by check the fuel oil sulfur content on the invocestbills ofISt 1 weight. If the tank contains No. 6 Fuel Oil for use in lading. [N.J.A.C. 7:27-22.16(o)) In Compliance Station Records NoSalem County New Jersey (Zone 5), the maximumallowable sulfur content is 1.0 percent by weighL_N.JJA.C. 7:27- 9.2(at_The vapor pressure of the liquid, excluding the vapor None. None.

IS1 2 pressure of water, shall be less than 0.02 psia at the In Compliance Station Records Noliquid's actual temperature or at 70 degrees F.

whichever is higher. IN.J.A.C. 7:27-22,11The tank shall be subject to the NSPS requirements to Noner None.maintain a record of tire contents of the tank, theperiod of storage of these contents, and the maximum

ISf 3 true vapor pressure of the liquid stored. The tank shag In Compliance Station Records Nonot be subject to any other NESHAPS. MACT, or

NSPS air pollution control standards. [N.J.A.C. 7:27-22.11the lank's potential to emit each TXS and each HAP None. None.

01l d shall not exceed dhe de minimis reporting thresholds asspecified in N.J.A.C. 7:27-22, Appendix, [N.J.A.C. 7:27- In Compliance Station Records No22.11Maximum wastewater concentration of these None. None.

102 1 insignifcant sources < 100 ppb by weight of any TXSand < 3500 ppb by weight of total VOC. [NJ.A.C. 7:27- In Compliance Station Records No22.11The owner or operator shall comply, as applicable, with Other: The owner or operator shatll comply, as Other: The owner or operator shall comply. asthe requiremeatslstandards for open top tank applicable, with the monioring requirements for open applicable, with the recordkeeping requirements forIS4 1 operations as required in N.J.A.C. 7:27-16.6 [NJ.AC. top tank operations as required in N.J.A.C. 7:27- open top tank operations as required in NJ.A.C. 7:27- In Compliance Station Records No7:27-16.61 16.6[N.J.A.C. 7:27-16.61. 16.6[N.J.A.C. 7:27-16.6].Solvent must contain less than 5% by weight of any Other. Monitored by formulation data. Recordheeping by invoices I bills of lading at thecombination of methylene chloride, perchioroethylene, At the tithe of filling, confirm by MSDS or bit of - approved frequency (per filing, showing materialsIS4 2 1,1,1-trichloroethane. carbon tetrachloride and tading[4O CFR 63.460(a)]. being delivered). [N.J.A.C. 7:27-22.16(o)l In Compliance Station Records Nochloroform. (40 CFR 63.460(a))

IS5 1 No Additional Applicable Requirements. [None] None. None. In Compliance Not Applicable NoSmoke: No person shall cause, suffer, allow or permit Other. Pedodic Visual Inspection,[N.J.A.C. 7:27- None.I 6 1 visible smoke to be emitted into the outdoor air from 22.16(o)l.IS6 1 the combustion of fuel in any stationary indirect heat In Compliance Station Records Noenchonger. [N.J.A.C. 7:27- 3.2(a()]_______________

Sulfur Content in Fuel n- 0.3 weight %. Maximum Sulfur Content in Fuel: Monitored by visual Sulfur Content in Fuel: Reordikeeping by fuelallowable sulfur content in distillate oil limited to 03% determination once per bulk fuel shipment The certification receipts per delivery in a petnnanenllyIS6 2 by weight. This requirement is applicable whenever permitltee shag check the fuel oil sulfur content on the bound logbook. [N.J.A.C. 7:27-22.16(o)] In Compliance Station Records Nocombusfitg distillate oil. [NJ.A.C. 7:27- 9.2(b)] invoiceslbills of lading for each delivery. (N.J.A.C. 7:27-Sulfur Content in Fuel: Ifthe tank contains distillate Sulfur Content in Fuel: Monitored by review of fuel None,fuel for use in Salem County New Jersey (Zone 5). the delivery records per delivery. The permittee shallmaximum allowable sulfur content is 0.3 percent by check the fuel oil sulfur content on the invoiceslialls of16 I weight. If the tank contains No. 6 Fuel Oil for use in lading. [N.J.A.C. 7:27-22.16(o)]Salem County New Jersey (Zone 5), the maximum In Compliance Station Records Noallowable sulfur content is 1.0 percent by weight.[N.J.A.C. 7:27- 9.2(a)]

IS16 2 The operating temperature shall not be greater than None.350 degrees F. )N.J.A.C. 7:27.22.1N

None.In Compliance Station Records No

0 .,o

11"1oe reck and (,3-,enrafingI Strungr,

Compliane Statfin Method 1. [ In ComplianerReful Applicable Requirement Monitoring Requirement Recordkeeping Requirement pn Clorpasnce Deternire Schedule Comments

Non-Complianeo) Compliance Attached? (Yes/No)

ile vapor pressure of Ihe liquid, excluding the vapor None Nonepressure of water. shall be less than 0.02 psia at the

iS liquid's actual temperature or at 70 degrees F. In Compliance Station Recorn s Nowhichever is higher [N.J.A.C 7:27-22,11

The tank shall have no visible emissions, enctusive of None. None.IS16 4 water vapor. to the outdoor atmosphere. IN J.A C. 7:27- In Compliance Slation Records No22T1]______________

The tank shall not emit any air contaminants which - None. None.ISf16 m y cause an odor detectable outside the property In Compliance Station Records Noboundaries of the faciity. [N.J.A.C. 7:27-22.11

The tank sh0fI not qoalfty for any NESHAPS, MACT. or None. None.NSPS air polludon control standards, excluding theNSPS requirementes to maintafn a record of the

ISf contents of the tank. tie period of storage of these In Compliance Station Records Nocontents, and the maximum true vapor pressure of theiqunid stored. IN.J.A.C. 7:27-22.1),Tbe tank's potential to emit each TXS and each HAP None. None.

IS16 shalf not exceed fie de minimis reporting thresholds asspecified in N.J.A C. 7:27-22. Appendix. [N.J.A.C. 7:27- In Compliance Sfatbn Records No22.11

The percentage by weight of all HAPs collectively in Nore. None.IS16 8 the raw material stored in the tank shall be less than In Compliance Station Records No1.0 percent. [NJ.A.C. 7:27-22.1]

The owner or operator shall have reedify available None. None.upon Department request a statement cetoifed inaccorrance with N.J.A.C. 7:27-1.39, signed by theresponsible official, as defined at N J,A.C. 7:27-1.4t

IS16 that: (1) specifies the contents of the tank: (2) affirms In Compliance Station Records Noftr the tank meets the applicable requirements of Ref.02 to #8 above and (3) attests bhat the tank is incompliance with all other applicable State or federal airpoliution requirements, [N.J A.C. 7'27-22.t1

The external surface of the tank shall be painted arrd Noone Noreomaintained white, except that this provision shall notapply to words arrd topograms applied to the externalsurface of the storage tank for purposes of

U I OS0 I identification provided such symbols do not cover more In Compliance Station Records Nofhan 20% of the external surface area of the tank'ssides and top or more than 200 square feet (18.6square meters), whichever is less. [N.J.A.C. 7:27-16.2(bt1it

Any person responsible for the emission of any Monitored by review of fuel delivery records once per Recordokeeping by fuel certification receipts perapplicable VOC from any storage lark pursuant to this bulk fuel shipment. )N,J.A.C. 7:27-22,16(o)) delivery, [NJA C 727-22,16(o)]

U I OS0 section shall maintaio, for each tank, records In Compliance Station Records Nospecifying eacr VOC stored endbthe vapor pressure ofeach VOC at standard nonditions IN.J.A.C. 7:27-16.2(k))

The owner or operator shell comply with tire applicable Other: The owarer or operator shall comply with the Other: The owner or operator shall comply with thestandards for the emissions of applicable VOC from applicable onitoring requirements for the emissions epplicable recordkeeping requirements for thestationary storage tanks as required in N.J.A.C. 7:27- of applicable VOC from stationary storage tanks as emissions of applicable VOC from stationary storageU 1 OSO 3 1622 N J.A.C. 7.27-16.2) and IN J A C. 7.27-16.221 required in N JA.C. 7:27-16 .2. [N.J.A.C. 7.27-16.211 tanks as required in N.J A.C. 7:27-16.2 )N.J.A C. 7.27- In Compliance Station Records NoIN.J.AC. 7:27-16.21 andIN JAC 7:27-1622). 182) odntiN.J.A,.C. 7:27-16,22)

Gasoline transfer from any delivery vessel into the None. None.storage tank shall be made only through a permanently

U I OS0 d affixed submerged fill pipe. [N.J.A.C. 7:27.16.3(c)1i] In Compliance Station Records No

Page 4 of 80

Section 6 -Complianue StatusP1EG, N0uclcar IC

I Type Cr-ek 1rd S.len 51- G-rtnrg Staticos

Compliance Status Method to t. a ComplianceRef # Applicable Requirement Monitoring Requirement Recordkeeplng Requirement (In Complrance Oetrmiene Schedule ConmmenrtsNoe-Corptianlce) Compliance Attached? (Yesnlo)

Gasoline transfer from any delivery vessel into the Other. Visual observalion• of pressure/relief valves or Other: Permitee shall record obsernations duringstorage tank shall be made only with a vapor control each anmospheric vent during gasoline gasofine transfer in either a logbook or in readilysystem that: transfer.IN J.AC. 7:27-22.16(o)]. accessible computer memories In addition, the1) Reduces the total applicable VOC emissions into the permitee shall retain on site the manufacturersoutdoor atmosphere by no less than 98% of the specifications demonsrrating compliance with thisapplicable VOC by volume in the air-vapoir mixture requirement for the life of the equipment IN.J.A.C. 7:27-U 1 OSO 5 displaced during the transfer of gasoline. 22.16(o71, In Compliance Station Records No2)The pressure/vacuum relief valves on eachatmospheric vent shall be adjusted to remain closedduring transfer operations [N.J.A.C, 7.27-16 3(d)fij

Tank content limited to gasoline. (NJ.A.C. 7:27- Other: Tank contents are monitored by checking Other: Keep records of invoices/bills of lading showingU1 aSp 6 22.16(e)] invoices/bills of lading showing materials delivered. materials delivered. Per delivery,[N.J.A.C. 7:27- In Compliance Station Records NoPer delivenry.(N.J.A.C. 7:27-22.1e6(o). 22.16(o)].Permittee's annual throughput limit from Other: Pormitfee shall monitor monthly gasoline Other: Permittea shall record in either a permanentlyyreconslrvction permit is 70.000 gallons per year. throughput by inspecting fuol flow totalizer on each bound logbook or in readily accessible computerU I a05 7 N.J.A.C. 7:27-22.16(e)j pump.JN.JA.C. 7:27-22.16(o)]. memories, monthly gasoline throughput rates.IN.J.A.C In Compliance Station Records No

7:27-22.16(o)7.VOC (Total) <= 0.005 tons/yr. Annual emission limit None, None.U 1 0S0 8 based on preconstrucrion permit. IN.J.A.C. 7:27-

In Compliance Station Records No22.16le)tVOC (Total) -v 2.88 tonslyr Annual emission limit None. None,U 11 a05 I based on the preconstruction permit. (N.J.A.C. 7.27-

In Connplionce Station Records No22.16(e1lNOx (Total) -= 99.1 tonslyr. Annual emission limit None. None.U lt aSS 2 based on the preconstruction permit. (N J A.C. 7:27-

In Compliance Station Records No22.1611e)CO -= 25.9 tons/yr. Annual emission limit based on None. None.U TI a05 3 the preconstruction permit. [N J.A.C. 7:27-22.16(e)]

In Compliance Station Records NoS012 v 9Z8 tonsiyr. Annual emission linrit based on None. None.U It 0S0 4 the preconstruction permit. [N.J.A.C. 7:27-22.16(e)]

In Compliance Station Records NoTSP nv 2.44 tons/yr, Annual emission limit based on None None.U 11 aSs 5 the preconstrucfion permit. [N.J.A C. 7:27-22.t6(et]

In Compliance Station Records NoPM-i0 (Total) -v 2.44 tons/yr. Annual emission limit None. None.U if OSO 6 based on the preconstruction permit. [N.J.A.C. 7:27-

In Compliance Station Records No22.16(e)lPofynuclear aromatic hydrocarbons (PAH's) -= 0.007 None. None.U 11 a05 7 toaslyr. Annual emission limit based on operating

In Compliance Station Records Nopermit application. INJ.A.C. 7:27-22.16(a)]Total Hours of Operation v- 350 hrlyr each. Maximum Total Hours of Operation. Monitored by houtlibre Other. Recordkeeping by manual logging of parameterannual operating hours based on preconstrucfion monitor continuously. based on one calendar year. or readily accessible computer memories each monthpermit [N.J.A.C. 7:27-22.16(e)] The permittee shall install, calibrate and maintain in during operation.[N.J.A.C. 7:27-22.16(e)]U 11 040 8 accordance with the manufacturer's specifications, a In Compliance Station Records Nototalizing howr meter to monitor the total hours of

operation per year fT the generator. IN.J.A.C. 7.27-22,16(e)7

The Emergency Generators as defined in N.J.A.C. None. Recerdkeeping by manual logging of parameter upon7:27-19.1 cannot be used for load shaving, peaking occurrence of event. The permittee shall record inpower production, or generation in an agreement with a either a permanent bound log book. or in readilyU 1t OSO 9 utility energy assistance program. [N J.A.C 7:27- accessible computer memories. each occurrence of In Compliance Station Records No22.16(aJ] start-up. date, duration of emergency generatoroperation and reason and the name of the personmakiog the entry. [N.J.A.C. 7:27-22.16(oil

W.af

i-i. - r S. 111PSEG ' '',IC.I Tripe Creek arid Snlee .C eneraating 5htatiacs

Cocmplance Status Method to Is a ComplianceRef # Applicable Requirement Monitoring Requirement Recordkeeplirg Requirement (In Compliance Determine Schedule Comments

Nor-Coepliance) Corpliance Attached? (YesINo)

Opacity <= 20 %. An emergency diesel generator that None Noneis located at a facility that generates electricity fromnuclear power and that is subject to regulation by theNuclear Regulatory Commission is exempt from theprovisions of N.JA.C. 7:27-3. 1- owever this exceptionfrom the applicability of this subchapter shatll applyonly as follows:i, During a test mandited by the Nuclear RegulatoryCommission; orii, During a period when off-site supply of electricity is

U 11 OS I not available due to causes outside the control of the In Compliance Station Records Noownrer or operator of the facility and operation of thegenerator is needed for tIre protection of public healthor welfareif these exemption periods do not apply, no personshall cause, suffer, allow on permit smoke greater than20% opacity. exclusive of visible condensed watervapor, to be ernited into the outdoor air from thecombustion of fuel in this neit except for a period of notlonger than 10 consecutive seconds (N.J.AC. 7:27,3.7(a)4[

padticulate Emissions - 10.5 Whtr. Particulate None. None.U 1 OS1 2 emission limit from the combustion of fuel based on In Compliance Station Records No

rated m~at input of source. N.J.A.C. 7:27- 4.2(a)] ,

oSurfu Content in Fuel = 0.3 % sulfur by weight, Sulfur Content in ruelo Monitored by review of fuel Sulfur Content in Fuel: Recordkeeping by fuetMaximum allowable sulfur content in fuel oil by fuel delivery records per delivery. [N.J.A.C. 7:27-22,16(e)] certification receipts per delivery showing sulfur

U 11 001 3 typelviscosity and geographical zone (Salem County). content. [ItJ A.C. 7:27-22t16(e)l In Compliance Station Records No

NNJ.A.C. 7:27- 9.2(b)]

VOC (Total) = 4,11 ebthr. Maximum emission rate None None. •

t 1 Ot1 4 hfrom preconstruction permit [N.J A.C 7:27-22.16(ee)] t Compliance Station Records NoNOx (Tolal) -= 141.48 lblhr. Maximum emission limit None. None.

U 11 0s1 t based on preconstruction pereit (NJ.AC. 7:27- In Compliance Station Records No

CO <- 36.97 Ib/hr. Maxirnum emission rate from None. None In Compliance Station Records Nopreconstruction perrit. (N.J.A.C. 7:27-22,16(e)[

S02 = 13 83 b/ht. Manimum emission limit based on None. None.U ii OS1 7 the preconstructio permit. INA A C. 7:27-22.16(e)) In Compliance Station Records No

[SP <=3.40 lb/hr. Manirurn emrission rate born None None.

U 1t OSt 8 6 reconstruction permit. [N.J.A.C. 7:27-22.16(e)] In Compliance Station Records No

PM-10 (Total) -= 348 Whir. Maximum emission rate None. None.

U 11 GOS 9 from preconstructhon permit iN J.AC. 7:27-22 16(e)l In Compliance Station Records No

Generator fuel limited to low sulfur distillate oil. Monitored by review of furel delivery records per Recordkeeping by manual logging of parameter per

Ul os1 [NJ.A.C 727-22t16(e)1 delivery, Review bills of ladinglinvoices [N JAC. delivery in a permanently bound logbook or redly

7:27-22.16(o)] accessible computer memory. [N IA.C. 7:27-22.16(o)) In Compliance Statio Records No

Maximum Gross Heat Input -= 4564 MMBTUlhr Other: Fuel burner rated capacity [N J.A C. 7:27- NoneU 11 Ot1 (HHV) Maximur gross heat input. based on the 22.16(e)] Ir Compliance Station Records No

preconstruction permit. [N J.A.C. 7:27-22.16(e)]

Page 6 1f 0

Section 6 - Crmpliance StarttsPh-r.C Nuxiar 1t.C

Itupe Cra'k awl Satem Generating Shttiven

Compliance Status Method to Is a CompllancaRef # Applicable Requirement Monitoring Requirement Recordkeeptng Requirement (In Compliance Do.hmterrn Schedule CommentsNon-Compliancet Compliance Attached? (YeaIN.)

Opacity <= 20 %. An emergency diesel generator that None. None.is located at a facility that generates electricity fromnuclear power and that is subject to regulation by theNuclear Regulatory Commission is exempt from theprovisions of N.J.A.C. 7:27-3. However, this exceptiontror the applicability of this subchapter shall applyonly'as follows:

ouring a test mandated by the Nuclear RegulatoryCommission; orii. Ouring aperiod wheroff-sitesuppy, ofelechricityis

U 11 OS2 t not available due bo causes outside the control of the In Compliance Station Records Noowner or operator of the facility and operation of the

generator is needed for the protection of public healthor welfare,If these exemption periods do not apply, no personshall cause, suffer, allow or permit smoke greater than20% opacity. exclusive of visible condensed watervapor, to be emitted into the outdoor air from thecombustion of fuel in this unit except for a period of notlonger than 10 consecutive seconds, {N.J.AC. 7:27-3.7(a)41

Particulate Emissions -= 10.5 lb/hr. Particulate None. NoneU it OS2 2 emission limit from the combustion of fuel based on

In Compliance Station Records Norated heat inpu of source. [N.J.A.C. 7:27- 4.2(a)]Sulfur Content in Fuel <- 0.3 % sulfur by weight. Sulfur Conlent in Fuel: Monitored by review of fuel Sulfur Conent in Fuel: Recordkeeping by fuel

U it OS2 3 Maximum allowable sulfur content in uet oil by fuel delivery records per delivery, [N.J.A.C. 7:27-22,16(e)) certification receipts per delivery showing sulfur In Compliance Station Records Notypelviscosity and geographical zone (Salem County). content. IN,J.AC. 7:27-22.16(e)/N.J,A,C. 7:27- 9.2(b)]

U 1 002 d VOC (Total) -= 4.11 lb/hr. Maximum emission rate - None. None. In Compliance Station Recards NoUfro___ tam preconstructhon Permit. rN.J.A.C. 7:27-22.16(e INOx (Total) -= 141.48 lb/hr. Maximum emission limit None. None.

U St OS2 5 based on preconstruction permit. [N.J.A.C 7:27- In Compliance Station Records No.22,16(e)]

U 0S2 CO -= 36.97 lb/hr. Maximum emission rate from None. None. to Complionce Statinn Records NUreconstruction permit. fN.J.A.C. 7:27-22.16te)l InComplianceStationRecords___oS02 ox 13.83 lb/hr. Maximum emission limit based on None. None.

U it 052 7 the prnuonstruction permit, [N.J.A.C. 7:27-22.16(e)f In Compliance Station Records No

Tt 002 8 SP -= 3.48 lb/hr. Maximum emission rate from None, None.___1_S 8 preconstruction permit. IN.J.A.C. 7:27-22.16/e) In Compliance Station Records No

PM-10 (Total) -v 3.48 lb/hr. Maximum emission rate None. None.U 15 OS2 6 from preconstruction permit. N.J.A.C. 7:27-22.16(e)]

In Compliance Station Records NoGenerator fuel limited to low sulfur distillate oil. Monitored by review of fuel delivery records per Recordkeeping by manual logging of parameter per

U 11 OS2 I0 [N.J.A.C. 7:27-22.16(e)] delivery. Review bills of ading/invoices. IN J.A.C. delivery in a permanently bound logbook or redly In Compliance Station Records Na- 7:27-22.16(o)1 accessible computer memory. [N.J.A.C. 7:27-22.t16(o) I

Maximum Gross Heat Input -= 45.64 MMSTU/hr Other: Fuel burner rated capacity.IN.J.A.C. 7:27- None.U St OS2 11 (HHV). Maximum gross heat input, based on the 22.16(e)].

In Compliance Station Records Nopreconstruction permit. NJA.C. 7:27-22.16(e)] -

. to

n ecitih ft - * oe ShIMt.

I Crnch and Salt,, Cnuriting Sintioll

oipltanca Ot-tt M'thod to 1. i a CorttplitlleRef # Applicable Requirement Monitoring Requirementpt (In Copliac Detme Schedule Comments

Noe.Compliance) Compliance Attached? (estlio)

Opacity=20N%. An emergency diesel generator that None, one. -is located at a facility thai generates electricity fromnuclear power and that is subject to regulation by theNuclear Regulatory Commission is exempt from theprovisions of N.J.A.C. 7:27-3. 1iowevert this exceptionfrom the applicability of this subchapter shall applyonly as follows:

o During a test mandated by the Nuclear RegulatoryCommission: otii Duting a period when off-Site supply of electicity is

U 1 OS3 1 not available due to causes outside the control ot the In Compliance Station Records Noowner or operator of the facility and operation of the

geherator is needed for the protection oa public healthot welfare,If these exemption periods do not apply. no personshall cause, suffer, allow or permit smoke greater than20% opacity. exclusive of visible condensed waternapor, to be emitted into the outdoor air from thecombustion of fhel in this unit except for a period of notlonger than 10 consecutive seconds [N.J AC. 7:27-3.7(a)d[

Particulate Emissions o- 115 Wblhr. Pariculate None. None.U ft OS3 2 eentission limit ftom the combustion of fuel based on In Compliance Station Records No

rated heat input of source. [N.J.A.C. 7:27- 42(a)][

Sulfur Content in Fuel =- 0.3 % sulfur by weight, Sulfur Content in Fuel: Monitored by review of fuel Sulfur Content in Fuel: Pecordkeeping by fuelMaximum allowable sulfur content in fuel oil by fuel delivery records per delivery. [N.J.A.C. 7:27-22,16(e)] certification receipts per delivery showing sultar

01t OS 3 typeaNiscosity and geographical zone (Salem County). content. [N.J.A C. 7:27-22.16(e)] In Compliance Station Records NoNJ.AC 7:27- g.2(b)]

S OC (Total) - 4,t 11!hir. Maximum emissio rate None. None,

OS fromprecotsaucthoitpermTit.[N.J.A.C. 7:27-22,16(e)[ In Compliance Station Records No

NOx [Totat) [= 14 48 th1t1. Maximum emission limit None. N~oe.U It OS3 S hased on pteonnstruction permit. [N.J.AC. 7:27- In Compliance Sat,.,n Records No

CO <=36,971blbr. Manitum en issiatt rate itomn None. None.Utt OS3 6 pteconstructios permit [N.J.AxC. in 2iI22.16[e)[ In Compliance Station Records No

S02 c= 13.83 tb/hr. Maximonum emission limit based on None. None.U 11 OS3 7 the pteconstruction permit. [N.J A C. 7:27-22.16(e)] -- In Compliance Station Records No

TSP = 3.48 lb/hr. Maximum emission rate from None. None. tn Compliance Station Records NoS11 OS3 8 preconstruction permit. [NJ.A.C. 7:27-22.16(e)[

PM-10 (Total) -= 3 48 bthr. Maximum emission rate None. None.U 11 OS3 9 from preconstructbon permit [N:J.AC. 7:27-22.1[(e)[ In Compliance Station Records No

Generator fuel litmited to low sulfur distillate oil. Monitoted by review of fuel delivery recotds per Recordkeeping by manual loggilg of parameter per

U11 OS3 10 [N.J.A.C. 7:27-22.16(e)l delivery. Review bills ofladinglinvoices [N.J A.C. delivery in a peirranently bound logbook of redily•7:27-22.161(o)) accessibte computer metnoty. [N.J.A.C. 7:27-22.11610)1 to Compliance Stalion Recotids ito

, 1 Mavimum Grots Heat Input = 45.64 MMSt UHi Other: Fuel burner rated Copacly.[N.J.A C. 7:27. None.

S 11 053 1 [tIHHV). Maximum gross heat input. based on the 22 16(e)]. In Compliance Station Records Nopreconstruction permit. [N.J.A.C. 7:27-22.16(e)]

Poon 8 of nh

SectMio 6 -Cmnpliaece StatonPSE, NrJ-1-ar 11,C

I fope Crocek rnd Saler Ge,-rraling Statins

Coepliance Status Method to Is a CoerplianceApplicable Requirement Monitoring Requirement Recordkeepthg Requirement (in Compliance Determirne Schedule CommentsNo-Comjilianc) Compliance Attached? (YestNo)Opacity n= 20%. As emergency diesel generator that None. None.

is located at a facility that generates electricity fromnuclear power and that is subject to regulation by theNuclear Regulatory Commission is exempt from theprovisions of N.JA.C. 7:27-3, However, this exceptionfrom the applicability of this subchapter shall applyonly as foltows: .

During a test mandated by the Nuclear RegulatoryCommission; orii. During a period when off-site supply ofelechicity is

U11 OS4 1 not available due to causes outside the control of the In Compliance Station Records Noowner or operator ot the facility and operation of the

generator is needed tor the protection of public healthor welfare.If these exemption periods do sot apply, no personshall cause, suffer, allow or permit smoke greater than20% opacity. exclusive of visible condensed watervapor, to be emitted into the outdoor air from thecombustion of tuel in this unit except for a period of notlonger than 10 consecutive seconds. [NJA.C. 7:27-3 7(a)41

Particulate Emissions v= 10.5 lb/hr. Partioulate None. None,U St OS4 2 emission eimit from the combustion of fuel based on

In Compliance Station Records Norated heat input of source. ]NJ.A.C. 7:27- 4.2(a))Sulfur Content in Fuel <- 0,3 % sulfur by weight, Sulfur Content in Fuel: Monitored by review of futl Sulfur Content in Fuel: Recordkeeping by fuelMaximum allowable sulfur content in fuel oil by fuel delivery records per delivery. [N.J.A.C. 7:27-22.16(e)] certification receipts per delivery showing sulfurU it OS4 3 type/viscosity and geographical zone (Salem County). content. ]N.J.A.C 7:27-22.16(e)] In Compliance Station Records No[N.JA.C. 7:27- 92(b))

VOC (Total) v= 4.11 tbthr. Maximum emission rate None, None.U 11 OS4 4 from precoostruclon permit. [N.JA.C, 7:27-22.16(e)] In Compliance Station Records No

NOx (Total) c- 141.48 lbthr. Maximum emission limit None. None.U fI OS4 5 based on preconstnrotion permit. [N.J.A.C. 7:27- In Compliance Station Records No22.16(e)]

CO -c 36.97 lbfhr, Maximum emission rate from None. None.U It 054 6 preconstruction permit. [N J,A.C. 7:27-22.16(e)] In Compliance Station Records No

SO2 v= 13.83 iblhr. Maximum emission limit based on None, None.U it OS4 7 the pfeconstruction permit. [N.J.A.C. 7:27-22.16(e)]

In Compliance Station Records NoTSP c- 3.48 Ibthr. Maximum emission rate from None. None.U it 054 8 preconstruction permit. N.J.AC. 7:27-22.16(e)]

In Comptiance Station Records NoPM-10 (Total) cc 3.48 Ibhr Maximum emission rate None. None.U It 0S4 9 (rom preconsntuction permit. (N.J.A C. 7:27-22.16(e)]

In Compliance Station Records NoGenerator fuel limited to low sulfur distillate oil, Monitored by review of toel delivery records per Recordkeeprig by u'rnual logging of parameter per

U 1 OS4 10 [NJA C. 7 27-22,16(e)] delivery. Review bills of ladioglinvoices. [NJ.A.C. delivery in a permanently bound logbook or redity In Compliance Station Records No7:27-22.16(o)] accessible computer memory, [N.J.A.C. 7:27-22.16(o)]

Maximum Gross Heat Input -c 45.64 MMBTU/hr Other: Fuel burner rated capacidy.(N.J.A.C. 7:27- None.U It OS4 11 (HHV). Maximum gross beat input, based on the 22.16(e)].

In Compliance Station Records Nopreconstruction permit. (N.J.AC. 7:27-22,16(e)eVOC (Total) = 1.29 tonslyr. Annual emission limit None, None.

U 15 OS0 1 based on maximum annual fuel mse, [N.J.A.C. 7:27- In Compliance Station Records No

NOx (Total) <- 47.3 tonslyr. Annual emission limit done. None.U 15 OSO 2 based on maximum annual fuel use. [N.J.A.C. 7:27- In Compliance Station Records No

CO v- 26.6 tonstyr. Annual emission limit based on None. None.U 15 OSO 3 maximum annual fuel use. [N JAC. 7:27-22.16(e)] In Compliance Station Records No

S02 <= 101 tons/yr. Annual emission limit based on None. None.U5 OSO 4 maximum annual fuel use. ]N.J.A.C. 7:27-22.16(e)) to Compliance Station Records No

TSP cc 4.74 tonstyr, Annual emission limit based on None. None.U 15 US0 5 maximum annual fuel use. [N.J.A.C. 7:27-22.t6(e)] In Compliance Station Records No

PM-1i (Total) v- 4.74 tonstyr. Annual emission limit None. None,U 15 OSS 6 based on maximum annual fuel use. {N.J.A C. 7:27- In Compliance Station Records NoI 22,16(e)]I

U sI OSO 7Arseic compounds no n.o2 tons/yr. Annual emissionlimit based on operating permit application. [N.J.A.C.7:27-22.16(a))

None.

ýNone. In Compliance Station Records No

. r0

-6-16t hial-

Ibrpe Creek arnd haleorC urtlleirry Slolirrnx

F i Compliance Stat"us Mehod I It a Compliance

~Ref6 Applicable Requirement Monitoring Requirement Recordkeeplng Requirement (1I Compnliane ODelrmn Sethedole CommentsNon.Conmpliance) Compliantce Attached,7 (YLst~o)

Pb~ ~ O 03 tons/yr. Annual emission limit poseo on None, None In.Complance Seatiecords a oU 15 Os0 8 operatingpermitapplicatio. [NJ.AC. 7:27-22.16(a)] In Compiance Station No

Polycyclic organic matter - 0.008 tonslyr. Annual None. N",vle.U 15 000 9 emission limit based on operating permit application,

In Compliance Station Records No(N.J.A.C. 7:27-22.16(a)]No visible emissions exclusive of visible condensed Other: Visual Determination Weekly when burning # 2 0ther: Manual logging of observations in awater vapor. except for a period of not longer than fuel oil The permiotee shall conduct visual opacity permanently bound logbook or reauly accessible(knee minutes in any consecutive 30-minule period inspections during daylight hours. Visual inspecionrs computer memory. Weekly when hurning # 2 fuel oil.[N.J.A.C,7:27-3.2(la)] & N.JA.C 7:27- 3,2(c)) shall consist of a visual survey In identify if (he stack lhe permittee must retain tre following records; (1)

has visible c.'rrsions. (other thant condensed water Date and time of inspection, (2) Emission Pointvapor), grearer than the prescribed standard. If visible number; (3) Operational staus of equipment; (4)emissions are observed, the perruitlee shall do Vie Observed anCulls vvd conclvsions. (0) Description offollowing: (1) Verify that the equipmeln and for control Corrective action taken if needed, (6) Date and timedevice causing tre emission is operating accordirg to opacity problem was solved, it applicable; (7) N.J.AC.manufacturers specifications and the operating permit 7:279:2 results if conducted: and (81 Name ofcomrpli•nce plan. I fthe equipment or control device is person(s) conductirg inspectfon.1N.J.A C. 7:27-Ut 5 S unot operating properly, the permiltee shall take 22.16(e)).corrective action immediately to eliminate the excess In Compliance Station Records Noemissions. The permittee most repot any permitviolation to NJDEP pursuant to N.J,A.C. 7:27- 2219.(21 If te corrective action laken in step one does notcorrect the opacity problem within 24 hours, tIecheck via a certified opacity reader, in accordance withN.J A.C. 7:27B-2. Such a test shall be conducted onceper day until corrective actirn is taken to successfullycorrect the opacity problem. the permittee mustreport any continuing permit volation to NJDEPPursuant to NJ A C. 7:27-22.19.[N J.A C. 727-22.16(o)1.

Partclulate Emissions v= 109 Wblhr. Particulate None. None.U 15 OS1 2 emission limit (row the combustion of fuel based on In Compliance Station Records Norated heat input of source. IN.J.A.C 7:27- 4,2(a)]

Sulfur Content in Fuel: 0 0.3 percent by weight. . Sulfur Content in Fuel: Monitored by review of fuel Sulfur Content in Fuel: Recordkeepirg by fuelMaximum alowable sulfur content in fuel oil by fuel oil delivery records per delivery. [N.J.A.C. 7:27-22.16(e)] certihication receipts once per bulk fuel shipmert. KeepU 15 051 3 typelviscosity and geographical zone [N JA C. 7:27- records of invoices'birls of fading shuwing fuel sultur In Complianue Station Reuords No9.2(a)) content. Per delivery. [N.J.A.C. 7:27-22,16(e)]

Adjust the combustion process in accordance with Other: Adjust combustion process by boiler hnre-up. Recordkeeping by manual legging of parameterN.J A C 7:27-19.16 each calendar year. Record NOx Arnually.[N.J.A.C. 7:27-16.8(c)]. annually in a permanently bound logbook or readilyand GO conc. after each adjustment and the 02 conc. accessi.,e Computer memory containing the followingat which NOx and CO were measured. [N.J.A.C. 7:27- information for each adjustment:16.8(c)) 1 The date of the adjustment and the times at which itbegan and ended:2 The name, Itle and affiliation of the person whomade the adjustlriet;3. The NOx concerrtralion in the effluent sheam, ineither ppmv or ppmvd, after each adjustment wasmade:4. The CO concentration in the effluent stream in eitherU is OSI ppmv or pamvd. after each adjustment was made; In Compliance Station Records No

5. The concentralion of 02 at which the CO and NOxconcentrations pursuant totire steps 3 and 4 weremeasured: and6. Any other information which the Depadtment or EPAhaS required as a condition of approval of any permitor certificate issued for the equipment or sourceoperation. (N.J AC 7:27-16.8(c)]

P.ae0 of 80

Section 6 - CnarpIlance States'5FiG Nuh'-r ftC

Ilope Crck And Saler Genraing Stations

I P

Applicable Requirement Monitoring Requirement Recordkieeplng RequirementCoerpliann Statos

(In ComplianceNon-Complianlce

Method to

Determine

Compliance

I. a ComplianceSchedule

Attached? fYCtsNo)Comments

The permittee shall not operate the hoiler in a mannerwhich will cause visible emissions. exclusive of visiblecondensed water vapor. except for a period not longerthan three minutes in any consecutive 30-minuteperiod, for which the opacity shalt not exceed 20percent: as determined by New Jersey Air Test Method2 (N.J.A.C, 7:27B-2), or approved equivalenl [N.J.A.G.7:27-22.16(e)}

OSI 5

Dither: Visual Determination. Weekly when burning # 2ceo oil. The permittee shalt conduct visual opacitynspections during daylight hours. Visual inspectionsthall consist of a visual survey to identify if the stackrs visible emissions. (other than condensed waterropor). greater than the prescribed standard, Ifvsible.=missions are observed, the permittee shall do thebltowing: (1) Verify that the equipment and /or controlJevice causing the emission is operating according tonanufacturers specifications and the operating permit:ompyionce plan, If the equipment or control device isnot operating property. the permittee shall takecorrective action immediately to eliminate the excessemissions. The permuttee must report any permitviolation to NJDEP pursuant to N.J.A.C. 7:27- 22.19.(2) If the corrective action taken in step one does notcorrect the opacity problem within 24 hours. thepernittee shall perform a check via a certified opacity

N. JA.C"7:2 7B- . Such a test shall be conducted onceper day uctel corrective action is taken to successfuttycorrect the opacity problem. The permittee mustreport any continuing permit violation to NJDEPpursuant to N.J.A.C, 7:27-22.).[N J.A.C. 7:27-

Recordkeeprng by manual logging of parameter eachweek during operation Manual logging of observationsin a permanently bound logbook or readily accessiblecomputer memory. Weekly when burning # 2 fuel oil.The penmittee must retain the following records; (1)Date and time of inspection: (2) Emission Pointnumber. (3) Operational status of equipment; (4)Observed results and conclusions: (5) Description ofcorrective action taken if needed; (6) Date and timeopacity problem was solved, if applicable, (7) N.J A C.7:278-2 results if conducted; and (1) Name ofpersonts) conductirng inspection. [N J.A.C. 7:27-22.16(O)l In Compliance Station Records No

5 I OC (Total) -= 0.19 Obehr. Maximum emission limit None. None. In Compliance Station Records No

U 15 O~t 6 based on preconstruotion permit. [N.J,A,C. 7:27- I opine SainRcrs N

NOx (Total) 0 7 buhr. Maximum emission limit based None, None.U 15 OSt 7 on preconstruction permit. [N.J.A.C. 7:27-22.16(e)j In Compliance Station Records No

CO -= 3.94 tb/hr Maximum emission rate based on None. None,U 15 0S1 8 operating permit application. [N.J.A.C 7:27-22.16ta)) In Compliance Station Records No

S02 = 14d9 Sb/hr. Maximum emission limit based on None, None.U 15 OS1 9 preconstruction permit. (N.J.A.C. 7:27-22 16(e)( In Compliance Station Records NoTSP -= 0.7 lblhr. Maximum emission limit based on None, None.U 15 tS1 10 preconstOuction permit. IN.A.C. 7:27-22.16(e)] In Compliance Station Records No

PM-10 (Total) = 0.7 Iblhr. Maximum emission linrit None. None.U 15 OS1 11 based on preconslruction permit. [N.J.A.C. 7:27- In Compliance Station Records No

e'1'oiler fuel limited to low sulfur distillate oil. N,.J.AC. None. None.U t5 opt 12 7:27-22.16(e)] In Compliance Station Records No

1 MaximumGross Heat Input =4B.7 MMBTUIhr(HHV). Other: Fuel burner rated capacity[N.J.A.C. 7:27- None.U S OSt 13 [N.J.A.C. 7:27-22.16(e)] 2Z 16(e)]. In Compliance Station Records No

Fuel Oil Usage -= 1.h56 MMgals per any period of 12 Other: Compliance with this condition shall be Other: An operating log book or electronic data storageconsecutive months. Maximum annual fuel usage limit demonstrated by operation of a flow meter system shall be kept to accurately maintain the houtybased on preconstruction permit. [N.J.A C. 7:27- continuously. based on a consecutive 12 month period fuel usage Gallons per consecutive 12-month period22.16(e)] (rolling one month basis).[NJ.A.C. 7:27-22.16(e)]. shall be calculated by the sum of the gallonsconsumed during any one month added to the sum ofthe gallons consumed during the preceding II monthsThis procedure will begin with the first full monthU 15 OS1 14 following the final issuance of the Operating Permit. In Compliance Station Records NoThis accounting will not include oil consumption duringmonths prior to the approval of the Operating Permit.The permitee will select the time period foraccounting, such as fscal month, caenldar month orproduction month. Once selected, the period must notbe changed without prior approval from

.eot0 0

0 -t'6 9- ' S n

it 1C0

.fCompliance Status Method to [t a ComrpliarnceRet # Applicable Requirement Monitoring Requirement Recordkeeptng Requirement (In Compliance Deterimne Shedui Comments

Nei-Comipllance) Compliance Attached? (YesIN.)

No visible emissions exclusive of ,nibte condensed Other. Visual Detnrmination. Weekly when burning f 2 Other: Maoual logging of obser ations in awater vapor. except for a period of not longer than fuel oil The permittee shall conduct visual opacity permanently bound logbook or readily accessit'•three minutes in any consecutive 30-minute period inspections during daylight hours. Visual inspections computer memory. Weekly a;on burning Of 2 fuel oil(NJXA.C7:27-3 2(a)t & [NJ A C. 7:27- 3.2(o}) shall consist of a visual survey to identify if the stack The pennittee must retain the following records: (1)

has visible emissions, (other than condensed wanlr Date and time of inspection; (2) Emission Pointuapor), greater than the prescribed standard. If visible number: (3) Operational status of equipment; (4)emissions are observed, the permittee shall do the Observed results and conclusions: (6) Description oftollowing (1) Verify that the equipment and for control corrective action taken if needed; (6) Date and timedevice causing the emission is operating according to opacity problem was solved, if appliable: (7) N.J.AC.manufacturers specifications and the operating permit 7:27B-2 results if conducted, and (8) Name ofcompliance plan If the equipment or control device is person(s) conducting inspechion [N J A C. 7*27-

U 15 OS2 1 not operating properly, the permittee shall take 22.16(o)] Ir Comptiance Station Records Nncorrective action immediately to etininate the excess

emissions. The permittee must report any permitviolation to NJDEP pursuant to N J A C. 7:27- 22.19.(2) If the corrective action taken in step one does notcorrect the opacity problem within 24 hours, the

check via a certified opacity reader, in accordance withN.J A.C. 7:27g-2. Such a test shall be conducted onceper day until corrective action is taken to successfullycorrect the opacity problem The permittee mustreport any continuing permit viotaton to NJDEPpursuant to NJ AC. 7:27-22 19 [N.J.A.C. 7:27-22.16gott.

Particolate Emissions <= 1059 lbhr. Particulate None. None.U 15 OS2 2 emissiun limit trom the combustion of uet based on In Compliance Station Records No

atrd heat input of source. IN.J.A.C. 7:27- 4.2tattSifur Content in Fuel: <= 0.3 percent by weight. Suofur Content in Fuel: Monitiired by review of fuel Sulfur Contert in Fuel: Recordkeeping by fuelManimum allowable sulfur content in fuel oil by fuel oil delivery records per delivery. [N.J.A.C. 7:27-22r 16(e)j certification receipts once per bulk fuel shipment. Keep

U t5 0S2 3 typetviscosity and geographical zone. [N.J.A.C. 7:27- records of invoiceshbilts of lading shewiro- fuel sulfur to Compliance Station Records NoI .2(a)j content Per delivery. [N.J.A.C. 7:27-22 1l(e(]

Adjust the combustion process in accordance with Other: Adjust combustiorn process by boiler nine-up. focordkeeping by manual logging of parameterN.J.AC.7 2719. t6 each calendar year. Record NOr Aihnualty.[N.J.A.C. 7:27-16.8(c)[. annually ii a permanently bound logbook or readilyand CO conc. after each adjustment anid the 02 conc. accessible comruptier Memory containiig the fo]jwingatwwhich NOx and CO were measured. [N.J.A.C. 7:27- intorination for each adjustment:16 h(c)] 1. The date of the adjustment aid the times at which it

hegan and ented.2. The narre, uitle and affiliation of the person whomade the adjustmernt;3. The NOx conicerrtration in the effluent stream. inegther ppmv or ppmvd. after each adjustment waserode:

4. The CO concentration in the effluent stream in either

U 15 092 4 prny or ppmvd. r-':r eacht adjustment was made; In Compliance Station Records No5. The corncentration of 02 at which the CO arid NOX

concentrations pursuant to the steps 3 arrd 4 weremeasured; aridi. Any other information which tIre Department or EPAhas required as a condition of approval of any permitor cetifiuate issued for the equipment or source

operation. (N.J.A.C. 7:27-t6.8(c)j

Page 12 of 80

Sectionr 6 - Compliance StatIsPPEG Nrtulcar i.LC

I hip, Creek and Salem C, nnrarting Statiros

Comrpliancer Stabus Method to I. a CorptianceRef # Applicable Requirement Monitoring Requirement Resordkeeptng Requirement (In Compliance Determine Schedule CommentsNo-Coompliancet Compliance Attached? (Yet/No]

he permittee shalt not operate the boiler in a manner Other: Visuat Determinraon, Weetry wher horning #2 Recordkeeping by manuat iogging of parameter eachwhich will cause visible emissions, exclusive of visible fuel oil. The permittee shall conduct visual opacity week during operation Manual logging of observationscondensed water vapor. except for a period not longer inspections during daylight hours. Visual inspectons in a permanently bound logbook or readily accessiblethan three minutes in any consecutive 30-minute shatt consist of a visual survey to identify if the stack computer memory. Weekly when burning # 2 fuel oil-period. for which the opacity shall not exceed 20 has visible emissions, (other than condensed water the permirtee must retain the following records; (1)percent, as determined by New Jersey Air Test Method vapor). greater than the prescribed standard. If visible Date and time of inspection; (2) Emission Point2 (N.J.A C. 7:27B-2), or approved equivalent. [N.J.A.C emissions are observed, the permnttee shall do the number: (3) Operational status of equipment; (4t7:27-22 16(e)] ollowing (1) Verify that the equipment and /or control Observed resuls and conclusions; (5) Description ofdevice causing the emission is operating according to corrective action taken if needed; (6) Date and timemanufacturers specifications and the operating permit opacty problem was solved. y applicable, (7) N.J.A C.compliance plan, If the equipment or control device is 7:278-2 results if conducted; and (8) Name of

U115 OS2 b not operating properly, the permittee shell take person(s) conducting inspecton [NJ.A.C. 7:27- In Compliance Station Records Nocorrective action immediately to eliminate the excess 22.16(o))emissions. The permitree must report any permitviolation to NJDEP pursuant to N.J.A,C. 7:27- 22,19.(2) If the corrective action taken in step one does notCorrect the opacity problem within 24 hours, thepermittee shall perform a check via a certified opacityN,J.A.C. 7:271-2. Such a test shall be conducted onceper day until corrective action is taken to successfullycorrect the opacity problem. The permittee mustreport any continuing permit violation to NJDEPpursuant to N.J.AC. 7:27-22 19.[N.J.A.C. 7:27-

VOC 1Totilt <= 0.19 lb/hr. Maximum emission limit None. None.U lb 002 6 based on preconstruction permit. [N.J.A.C. 7:27- In Compliance Station Records No

NOX (Total) v= 7 Ib/nr. Maximum emission limit based None. None.U 2 7 on preconstuton permit. (NJ.A.C. 7:27-22.16(e) In Compliance Station Records NoU lb 002 6 GO - 3 94 lbihr Maximum emission rate based on None, None.o5O2 - perating permit application, [N.J.A.C. 7:27-22.16(a)l

In Compliance Station Records NoS02 v= 14.9 Ithhr. Maximum emission limit based on None. None.U 15 0S2 9 reconstrlction permit. IN.J.A.C. 7:27-22.16(e)1

In Compliance Sttion Records NoTSP v= 67 0Ylhr. Maximum emission limit based on None. None. In Compliance Statio Records NoU 16 0S2 10 preconstrcltion permit. IN.J.A.C. 7:27-22.16(e)] In Compliance Station Records NoPM-10 (Total) -= 07 Ilb/hr. Maximum emission limit None. None.IU lb bS2 a bsed on preconstroction permit. (N.J.A.C. 7:27- In Compliance Station Records Nogoitler fuel limited to low sulfur distillate oil. [NI.A.C. None. None.U lb 002 12 7:27-22.16(e)) In Compliance Station Records NoMaximum Gross Heat Input -= 48.7 MMBTU/hr (HHTV. Other: Fuel burner rated capecdty[N J.A.C. 7:27- None.

NoU lb OS2 12 [N.J.A.C. 7:27-22.16(e)] I 22.16(e)].Fuel Oil Usage -v 1.556 MMgais per any period of 12 Uther: Compliance with this condition shall be Other. An operating log book or electronic data storageconsecutive months. Maximum armual fuel usage limit demonstrated by operation of a Dow meter system shell be kept to accurately maintain the hourlybased on preconstroction pemrit. [N.J.A.C. 7:27- rontinuously: based on a consecutive 12 month period fuel usage. Gallons per consecutive 12.month period22.16(e)] Irovling one month basis).)N.J.A.C. 7:27-22.16(e)). Shall be calculated by the sum of the gallons

consumed during any one month added to the sum oftie gallons consumed during the preceding 11 months.This procedure will begin with the first full monthU 15 OS2 4 following the final issuance of the Operating Permit. In Compliance Station Records NoThis accounting will not include oil consumption duringmonths prior to the approval of the Operating PermitThe permittee will select the time period foramcountieg, such as fiscal month, calendar month orproduction month. Once selected, the period must notbe changed without prior approval fromNJOEP.NJ.AC. 7:27-22.16(e)],

of #0

I bipo Creek ard Satnr Grrneralirr Station

Cormplince Status Method to Is.a CoerptlancRef J Applicable Requirement Monitoring Requirement Recordkeeping Requirement (In Compliance Detertnie Shefedute "Comments

Non.Cormplianc) Complianoe Attachod? (Yeetie)

No visible emissions enclusive of visible condensed Other,.Visual Determination, Weekly when burning *12 Other: Manrual logging of observations in a -

water vapor. except for a period of not longer than ftel ilt. The permittee shall conduct visual opacity peranerntly bound logbook or readily accessiblethree minutes in any conrsecutive 30-minute period inspections during daylight hours. Visual inspections computer memory. Weekly when lrrning f 2 fuel oilN[TJAC.7 27-3 2(a)] & [NJ.A.C. 7:27- 3,2(c)) shall consist of a visual survey to identify if the stack . The permittee must retain the following records; (1)

has visible emissions, (other han condensed water Date aid time of inspectior, (2) Emission Pointraper, greater than the prescribed standard. If visible nuomber: (3) Operational status of equipment: (4)emissions are observed, the permittee shall do the Observed results and conclusions: (5) Description offollowing t ) Verit that the equipment and lor contiol corrective action taken ihf reeded: (6) Date and time

device causing the emission is operating according lv opacity problem was solved, if applicable; (7) N.J.A.C.manufacturers specifications and the operating permit 7:27B.2 results if conducted, and (8) Name ofcompliance plan. Ift tie equipment or control deVoce is person(s) conducting irspection.)NJA.C. 7:27-

U 15 OS3 t not operating properly, tie permitlee shag take 22.16(o)], In Compliance Station Records Nocorrective action immediately to eliminate the excessemissions. The permittee must report any permitviolation to NJDEP pursuant to N.J.A C. 727- 22.19.(2) If the corrective action taken in step one does notcorrect fre opacity problem wathin 24 hours, thepermitree shat perform a check via a certified opacity

N.J AG 7:276-2. Such 8 test shall be conducted onceper day until corrective action is taken to successfullycorrect the opacity problem. The permittee mustreport any continuing permit violation to NJDEPpursuant to N.J.A C. 7:27-22.19tIN.J.A C. 7:27-

yarticulate Emissions v 10,9 lb/hr. Parriculate None. None.U 15 OS3 2 enrnissmon mind from the combustion o tfuel based on In Compliance Station Records No

rated heat input of scorce. [N.J.A.C. 7:27- 4.2(a)]

dofllr Content in Fuel: <- 0.3 percent by weight. Sutfur Content io Fuel: Monitored by review of fuel Sulfur Content in Fuel: ReCorudkeeping by fuelU 15 05 Mairmum alolowable sulfur content ir fuel oil by fuel oil delivery records per delivery. [N.J.A.C. 7:27-22.16(e)) certification receipts once per bulk fuel shipment. Keep

typelioscosity and geographicala zone. N J.A.C. 7:27- iecords ofiivoiceslbils oflading showing fuel sulfur In Compliance Station Records No

9.2(a)] content. Per delivery. IN.J.A.C. 7:27-22.16(e))Adjust the combustion process in accordance with Other: Adjust combustion process by boiler tune-up Recordukeeping by manual logging of paeaiveterN JA C.7:27-19.t6 each calendar year. Record NOx Annually.[N JA.C. 7:27-16.8(c)J. annually in a permanently bound logbook or readilyand CO conc. after each adjustment and the 02 conc, accessible computer memory containing tile followsingat which NOx and CO were measured. [N.J.A.C. 7:27- information foi each adjustment:16 8tc)] 1 The date of the adjustment and the times at which R

began arid ended.2. The name, tile and affiliation of the person whomade tire adjustment;3. The NOY conceritration in the effluent stream, ineother ppmv or ppmvd. after each adjustment wasmade:4. Tire CO concentration in the effluent stream in either

U 15 OS3 d ppmv or pamvd. after each adjustment was made: In Compliance Station Records No5 TIre concentration of 02 at which the CO and NOxcurconmtrtions pursuant to the steps 3 and 4 weremeasured: andr. Any utt•in information which the Department or EPAhas required as a ceedilion of approval of any permitor certificate issued for the oquipment or sourceoperation. IN J.A C, 7:27-16,8(c)]

Page 14 of R0

Section 6 Crunplifin-ce SIaMrr1PSEG; Nu.car t.iC

[ lore Creek sod haters CGenratinrg Stuiarks

Ref X Applicable Requirement Monitoring Requirement Recordkeeplng Requirement fThe permittee shall not operate the boller in a manner Other: Visual Determination. Weekly when burning # 2 Recordkeeping by manuat fogging of parameter eachwhich will cause visible emissions, exclusive of visible fuel oil The permittee shalt conduct visual opacity week during operation Manual logging of observationscondensed water vapor. except for a period not longer inspections during daylight hours, Visual inspections in a permanently bound logbook or readily accessiblethan three minutes in any consecutive 30-minute shall consist of a visual survey to identify if the stack conmputer memory, Weekly when burning # 2 fuel oil.period. for which the opacity shall not exceed 20 has visible emissions, (other than condensed water The permittee must retain the fallowing records; (1)percent. as determined by New Jersey Air Test Method vapor), greater than the prescribed standard. If visible Date and time of inspection: (2) Emission Point2 IN JA.C. 7:278-2), or approved equivalent [N.J.A.Cý emissions are observed. (he permittee shall do the number (3) Operationat status of equipment: (4)7:27-22.16(e)) talowing: (1) Verify that the equipment and/or control Observed results and conclusions: (5) Description ofdevice causing the emission is operaing according to corrective action taken if needed; (6) Date and time

manufacturers specifications and the operating permit opacity problem was solved, if appticable; (7) N.J.AC.comptianece plan. If the equipment or control device is 7:276-2 results if conducted; and (8) Name of

U 15 OS3 5 sot operating properly: the permittee shall take person(s) conducting inspeclon. (N.JA.C. 7:27-corrective action immediately to eliminate the excess 22.16(o)]emissions, The permittee must report any permitviolation to NJDEP pursuant to NJAC. 7:27- 22,19,(2) If the corrective action taken in step one does notcorrect the Opacity problem within 24 hours, thepermittie shall perform a check via a certified opacity

NJA.C. 7:278.2. Ouch a test shrall be conducted onceper day until corrective action is taken to successfullycorrect the opacity problem. The permittee mustreport any continuing permit violation to NJDEPpursuant to N.J.A.C. 7:27-22.19.[N.JA.C. 7:27-

No

U 15 OS3 6VOC (Total) -= 0.19 hIbls. Maximum emission limitbased on preconstruction permit. [NJ.A.C. 7:27-

None. None.In Compliance Station Records No

NOx (Total) -= 7 Ibdr. Maximum emission limit based None. None.U 15 OS3 7 on preconstruction permit. [N.J.A.C. 7:27-22.16(e)] In Compliance Station Records No

00 = 3,94 lbthr Maximum emission rate based orn None. None.U 15 OS3 a operating permit application. [N.J.A.C. 7:27-22.16(a)] In Compliance Station Records No

S02 -= 14.9 thbhr. Maximum emission limit based on None. None.U 15 OS3 9 preconstruction permit. [N.J.A.C. 7:27-22.16(e)) In Compliance Station Records NoSlb 05 10 TP P 0.7 Ibshr. Maximum emission limit based on None, None. In Compliance Station Records No1reconstruction permit, IN J.A.C. 7:27-22,16(e)]

CPM-1i (Totall 000.7 tb/hr. Maximum emission limit None, None.U 15 OS3 ft hased on preconStroction permit. [N J.A.C. 7:27- In Compliance Station Records No

Boiler fuel limited to low sulfur distillate oil. [NJ A.C. None. None.U t5 003 t2 7:72.6e]In Compliance Station Records NoI 7:27-22.16(el)]

Maximum Gross Heat Input -= 4857 MMBTU/hr (HHV) Other. Fuel burner rated capacity[N,JA.C. 7:27- None.U18 003 13 .. C7272.(e]•1e).In

Compliance Station Recordn . No)N.J.A.C. 7:27-22.16(e()] 22.t16(e)].Fuel Oil Usage <- 1.556 MMgafs per any period of 12 Other Compliance with this condition shall be Other: An operating log book or electronic data storageconsecutive months. Maximum annual fuel usage limit demonstrated by operation of a flow meter system shall be kept to accurately maintain the hourlybased on preconstruction permit. [N.J.A.C. 7:27- cowtinuously. based on a consecutive 12 month period fuel usage. Gallons per consecutive 12-month pedod22.16(e)) (roling one month basisf.)N.J.A.C. 7:27-22.16(e)). shall be calculated by the suns of the gallons

consumed during any one month added to the sum ofthe gallons consumed dudng the preceding 11 months.This procedure will begin witt the first foIl monthU15 OS3 Id following the final issuance of the Operating permit. In Compliance Station Records NoThis accounting will not include oil consumption duringmonths prior to the approval of the Operating Permit.TIhe permitgee will select the fimo period foraccountisig, such as fiscal month, calendar month orproduction month. Once selected, the pedod must notbe changed without prior approval from

Tank contents limited to a solution of 1v 6h% sodium Other: For each delivery, monitor by reviewing delivery Other: Maintain delivery records per delivery. ihebypochlorite in water. )N.J.A.C. 7:27-22.16(e)e records such as MSDS, invoice, ano(or bill of lading records shall indicate content of delivery: composition.U 19 OSO I that show content. composition, and quantity of the quantity delivered, and date of delivery with sum-to- In Compliance Station Records Nodeliwery.[N.J AC. 7:27-22.16(o)], date.[N.J.A.C. 7:27-22.16(8)0)

Total Material Transferred n= 800,000 gatfyr based on Other. For each delivery. monitor by reviewing delivery Other: Maintain deliveiy records per delivery. Theoperating pesmit application. [N.J.A.C. 7:27-22,16(a)] records such as MSDS. invice, andior bill of lading records shall indicate content of delivery. composition.U19 0S0 that show content. composition. and quantity of the quantity delivered, and date of delivery with sum-to- In Compliance Station Records Nodefivery.[NJ.A.C. 7:27-22.16(o)], date.1N.J.A.C. 7:27-22.16(8)))

rank contents limited to a solution of -= 15% sodiumlypochlnrite in water. [N.J.A.C. 7:27-22.1S(e)]U22 OS0 I

Other: For each delivery, monitor by reviewing deliveryrecords such as MSDS, invoice. andlor bill of ladingthat show content, composition, and quantity of thedetivery.[N.J A.C. 7:27-22.16(o)].

Other: Maintain delivery records per delivery. Therecords shall indicate content of delivery. composition,quantity delivered, and date of delivery with sum-to-date.[N.J.A.C. 7:27-22 16(o)]

In Complianrce Station Records No

.of 00

Sio f . t~pC F j,

0C,

Ref # Applicable Requirement Monitoring Requirement Recordkeeping Requirement IN

Total Material Transferred <= 900,000 gallyr based on Other: For each delivery, monitor by reviewing delivery Other; Maintain delivery records per delivery. Theoperating permit application. [N.J.A.C. 7:27-22l6(a)( records such as MSDS. invoice, andlor bhr of lading records shall indicate content of delivery, cauposition.U 22 OS 2bhat show content, composition, and quantity of the quantity delivered, and date of delivery wfh sum-to-__deliver.y[N.J.A.C. 7:27-22.16(o)l. date.[N.J.A.C. 7:27-22.16(o)]

TSP =65 9 tonstyr. [N.J.A.C. 7:27-22.1B(a)) TSP: Monitored by calculations annually tolling one T SP: Recordkeeping by manuat logging of parameterweek basis or storing data in a computer data system each weekTSP ITPY) = 00022 x n x C x TOS: where during orerationa = fhaction of circulating water lost to drift = 0 000,4 1'% Records shall be maintained on site for a period of fiveC = circulating water rate (gaitmin) = 612,000 gallmin 5) years after the date of each record and made(based on maximum capacity of cooling tower) available, to thle representatives of the DeparmnentrOS = total dissolved solids concentation in upon request. [N J.AC. 7:27-22.16(o)]circulating water (mgyl)A sample of the circulatirg water will be taken aininimurm of every 7 days and aniatyzed for TOS.

U 24 OSO 1 [N.J.AC. 7:27-22,16(o))

PM-t0 (Total) 65 9 tonstyr. [N.J.A.C 7:27-22.16(a)) PM-10 (Total): Monitored by calculations annually PM-t0 (Total): Recordkeeping by manual logging ofrolling one week basis, parameter or stodng data in a computer data systemPM-10 (TPY) = 00022 . D . C a TlS; where each week during operationD = fhacnon of circulating water lost to drift = 0.00041% Records shall be mairtained on site for a period of fiveC = circulating water rate (galutin) = 612.000 galimin (5) years after the date of each record and made(based on maximum capacity of cooling tower) available to the representatives of the DepartmentTDS = total dissolved solids concentration in upon request. [N JA.C. 7:27-22,16(o))circulating water (mgyl)A sample of the circulating water will be token aminimum of every 7 days and analyzed for TOS.U 24 OS0 2 [N.J.A.C 7:27-22.16(o)n

The facility shall notify the NJOEP Southern Regional None. None,Enforcement Office. NJDEP Bureau of OperatingPermits. and USEPA Region If of the start date of post.

U 24 OSs 3 EPU (specifically, post-thermat power uprate)operations of the Hope Creek Generating Stationwithin 30 days after this date occurs, [40 CFRParticulate emissions no greater than 20% opacity. None None.exctusve of visible conrdensed water vapor, for more

U 24 OS1 than 3 minutes in ary consecutive 30-minute period(N.J.A.C 7 27-6 2(d)] & [N.J.A.C 7:27- 6,2(e)]

Paem 16 of 80

Secti• 6•- Ctimpli-a n Stat-scoSEG Nlulsar f..LC

I lopi, Crnk and Srlo Generatiny Stations

Comrpllane Status Method to Ii C.nomplianreRef # Applicable Requirement Monitoring Requirement Recordbeaplng Requirement (in Compnliane Determine Schedule CommentsNon.Complianol) Compfline Attached? (YesfNo)

Maintain the following records: Other: See Applicable Requirement.N JA.C. 7:27- Other: The following shall be recorded in a1, A log of the total disslved solids concentration of 22.16(e)]. permanently bound logbook or in a computer datathe circulating water flow. A sample Will be taken and system (See Applicable Requirement):recorded during Cooling Tower operation a minimum 1. Total dissolved solids concentration of theof every 7 days in which the Cooling Tower operates: circulating water flow.2. The calculated maximum hourly particulate 2. The calculated maximum hourly particulateemissions in pounds per hour: emissions in pounds per hour;

U 24 OS1 2 3. The calculated maximum cumulative particulates 3 The calculated maximum cumulative particuletes In Compliance Station Records Noemissions in tons per years and emissions in tons per year: and4 Maintenance procedures applied to the tower. 4. Maintenance procedures applied to the[N.J.A.C. 7:27-22.16(a)) fowers[N.J.A C. 7:27-22,16(o)].

Total Material Transferred -= 2,550 tons/yr of chemical Total Material Transferred: Monitored by material Total Material Transferred: Recordkeeping by manualadditives (357 bhr NaOH and 225.3 It/hr NaOCI). feed/flow monitoring continuously. [N.J.A.C. 7:27- logging of parameter or storing data in a computer dataMaximum throughput rate based on operating permit 22.16(o)] system each Week during operation in a permanentlyU 24 OS1 application [N.J.A.C. 7

:27-2 2

.16a)( bound log book or readily accessible computer In Compliance Station Records Nomemory showing type of raw materials and amount ofeach chemical added with sum-to-date [NJA. C. 7:27-

TSP no 42 lb/hr. IN.J.A.C. 727. 6.5] TSP: Monitored by calculations each week during TSP: Pecordkeeping by manual logging of parameteroperation or storing data in a computer data system each WeekTSP (lb/hr) = 0.000501 1 u x C x TDS; W/here during operationo = fracton of circulating water lost to drift = 0.00041% Records shall be maintained on site for a period of fiveC = circulating water rate (gallmin) = 612.000 gal/min (5) years after the date of each record and made(based on maximum capacity of cooling tower) available to the representatives of the DepartmentTOS = total dissolved solids concentration in upon request. [N.J.A.C, 7:27-22. 6(o)(U 24 OSI 4 circulating Water (mg/l) In Compliance Station Records NoA sample of the circulating water wilf be taken aminimum of every 7 days and analyzed for TDS.[N.J AC. 7.27-22 16(o)]

PM-1 (Total) o 42 b/hr. )N.J.A.C. 7:27- 6,5 PM-t0 (Total): Monitored by calculations each week PM-t 0 (Total): Recordkeeping by manual logging ofduring operation parameter or storing data in a computer data systemPM-t0 (Ib/hr) = 0 t000501 x D x C x TDS: where each week duoing operationO = fraction of circulating water lost to drdft = 0.00041% Records shall be maintained on site for a period of fiveC = circulating water rate (galmin) = 612,000 gal/min (5) years after tre date of each record and made(based on maximum capacity of cooling tower) available to the representatives of the DepartmentTDS = total dissolved solids concentration in upon request. [N.J.A C. 7:27-22 16(o))U 24 OS1 5 circulating water (mg/I) In Compliance Station Records NoA sample of the circulating water will be taken a

minimum of every 7 days and analyzed for TDS.[N.J.A.C. 7:27-22.16(o)]

TSP no 30 1b/hr. The TSP emission limit of 30 Ishr will TSP: Monitored by calculations each week during Records shall be maintained on site for a period ofbe in effect unti the first day after final approval by the operation five (5) years after the date of each record and madeUSEPA of the single source revision to the NJ State TSP (Ilbhr) = 0.000501 x o xC x TDS: where available to the representatives of the DepartmentImplementation Plan (SIP) asesciated with the post- D = fhaction of circulating Water lost to drift = 0,00041 % upon request. TSP: Recordkeeping by manual loggingEPU (specifically: post-Extendad Thermal Power C = circulating water rate (gallmin) = 612,000 gallmin of parameter or storing data in a computer data systemUprate) operations of the Hope Creek Generation (based on maximum capacity of cooling tower) each Week during operation. [N.J.A.C, 7:27-22.16(o)]U 24 OS1 6 Station. [N.JAC, 7:27-22.16(a)) TOS = total dissolved solids concentration in In Compliance Station Records Nocirculating water (org/I)A sample of the circutating water will be taken aminimum of every 7 days and analyzed for T1S.[N.J.A.C 7:27-22.16(o)]

. 0180

be/on 6r *c h/a/en

/ fore Creek antd Snor ,ee r eretnrtStag h/ne

T Coreepbn Staten Mehobd in n a CmepfftteeRef # Applicabte Requerement Monitoring Requiremeet Recordkeeping Requirement fin ofp"' Detmina Schedule CommentsNon-Compliance) Compliance Agached? (Yee -No)

PM-1O (rotail) - 30 lb/hrt The PM1O emissiot limnitot PM-10(Total) Monitored by calcoaeions each week PM-10 (TotPM-1 Recordkeeping by manual logging of30 /bfhr will be in effect until the first day after final duriog operation parameter or sttrirg data in a computer data systemapproval by the USEPA of the sitgleesourcerevision PM-10 tb//br) =.000501 x DxC xTDS. where. each wee/s k- io.perwaionto the NJ State Implementation Plan (SIP) associated 0 fraction of circulating water lost to drift 0,00041 % Records shall be nrc -ýitten on site for a period of fivewith the post-EPU (specifioally. post Extended Thermal C circulating water rate (gaPmin) = 612,000 galm/n (5) years after tPe date of each record and madePower Uprate) operations of the Hope Creek (booed on maximum capacity of cooling tower) available to the representatives of the DepartetentGeneration Station. [N.J AC. 7:27-22,16(a)] TDS = total dissolved solids concentration in opon request IN.J.A.C. 7:27-22 16(o)]U 24 0S1 7 circolating water (mg//) In Compliance Station Records No

A sample of the circulating water wil/ be taken aminimum of every 7 days end analyzed for TDS(N.J.A.C. 7:27-22.16(o)l

NOx (Total) <= 00187 tons/yr. Annual emission limit None. None On May 22. 2008. the Oepctmerntbased on preconstruclron permit maximum tot urly tnd PSE0 Nuclear entered into aemission tate and 100 hr/yr operation. [N.J AC. 7:27-

Adeiaistretve Coeh.rt Order, tot22.16(e/] Seayed the emission hutis for (f/e

Guardhourse Standby Diesel EnginreU 33 US0 1 In Compiance Statio0 Records No and tf/e Scania Diesel Fire PUMp

f/J33 avd U35)/ A perrit applicitionto correct tf/e emission limits waseubrrtnied to tfe /nceo talent on61/2/0B Acopy of the ACO is

provided in Aitachnrent 2.C0=0.0043 tons/yr. Annual emission limit based on None. None.

On May 22: 2008. the Departmenrtpreconstroction permit maximum hourly emission rate and PSEG Nhclear emtored into a0e4 /00 br/yr opetin t(N J A.C. 7:27-22.16/e)(

Adrnicistrative Coose t Or/er tPira

Stayed th erission mrts fotr theGoeaOruse Standby Pic-r r--,ooU 33 OS0 2

n Compliance Stofion Records No and the Sea-a Dicicee Fire Pump(U33 and U35).-A permit eppliectrr

to correct the emission limits wassnbttrted/ to the Departmenrt oc6112/08. A copy of fre ACO is

provided irr Attachment 2.So2 ye 0.0367 tors/yr. Annual emission limit based None. Nonr. Orr Mo 22.2008. the Departmentott preconstruction permit maximum hourly emission .

On y000 N e eerenrate arrd 100 hrlyr operation. [N J A.C 7.27-22 16(e)] Ad;d PSEG Nuclear entered into aAdministrative Consent Order, fthat

Stayed the emission limits for ftileGuardrhouse Standby Diesel EngineU 33 OSO 2..

In Compliance Station Records No ard the Scania Diesel Fire Pump(U33 and U35). A perrrit an oicafior

to correct tire emissino lirnir. w/s

subroiOed to tire Deparenrrt on6./12/08 Acepy of Iro ACO is

rrovided ir AV-,,,v/rro 2,otao fHours of Operation <=100 hr/yr each. Maximum Total 1oors of Operation: Monitored by houotime " Total fouts of Opratrior: Recordkeeping by manual0nnual operating time based on preconstruction permit monitor continuousty, based on one calendar year. logging of pirameter each 0onth during operation.IN.J A C. 7:27.22 16(e)] The permiftee shall install. calibrate and maintain in The peot/itee shall record in either a permanent bound

accordance with the manufacturer's speciticafions. a log book; or in readily accessible computer memories . -U 33 OSO 4 0 totalizing hour meter to monitor the total hours of the monthly hours of operation of the generator and In Compliance Station Records Nooperation per year for the generator. IN.JA.C 7:27- made available to the representatives of the22.10/0) ] Oepartment of Environmental Protection upon request(N JA.C. 7:27-22,16(o)]

Page 18 orb0

Section 6 - C-mpliance StatuoPSCG Nuclear .LC

I tpre Creek and Sabem Generating Stations>

Compliance Stats Method to t, . ComptiirceRef fI Applicable Requiremtent Monitoring Requirement Recordtteeptng Requirement (In Comp-iadý Determine - Schedute CommentsNo-Co-urnpiace) Co...plisamce ;Attached? iYes/No)Upacity -o 20 %. An emergency diesel generator that None None.

is located at a facility that generates electricity fromnuclear power and that is subject to regulation by theNuclear Regulatory Commission is exempt from theprovisions of N.J.A.C 7:27-3. However, this exceptiontrom the applicability of this subchapter shall applyonly as follows

Outing a test mandated by the Nuclear RegulatoryCommission: orii Duing a period when off-site supply of electricity is

U 33 OSt I not available due to Causes outside the control of the In Compliance Station Records Noowner or operator of the facility and operation of the

generator is needed for the protection of public healthor welfare.If these exemption periods do not apply, no personshall cause, suffer, allow or permit smoke greater than20% opacity. exclusive of visible condensed watervapor, to be emitted into the outdoor air from thecombustion of foln in this unit except for a period of notlonger than t0 consecutive seconds, [NJ.A C. 7327-3.7(a)41

Particulate Emissions 00 1.428 tShr. Pariculate None. None,U 33 OSt 2 emission limit from the combustion of fuel based on

In Compliance Station Records Norated heat input of source. [N.J.AC. 7:27- 4.2(a)]Sulfur Content in Fuel -= 0.3 % sulfur by weight. Sulfur Content in Fuel:Monitored by review of fuel Sulfur Content in Fuel: Recondkeeping by fuelMaximnum allowable sulfur content in fuel oil by fuel delivery records per delivery. (N.J.A.C. 7,27-22.16(o)] certification receipts per delivery showing sutfurU 33 OSt 3 typelviscosity and geographical zone (Salem County). content. [N J.A.C. 7:27-22.16(o)) ICoipliunce Station ReCords NoNJ.AC. 7:27- 9.2b)]-

NOx (Total) o 0 374 Iolhr. Maximum emission limit None. None. On May 22. 2008, the Departmentbased on preconstruction permit. [N.J.A.C. 7:27- and PSEG Nuclear entered into22 16(e)]

Admiristretive Consent Ordcr, that

Stayed the emission liieils ho, theGuardhouse Standby Diesel Pr-giniU 33 OS1 4

In Compliance Station Records No and the Scamnp Diesel Fire Puimp(U33 anrd U35). A pe-mit coappic ron

to correct tli Cienlqiot !iiiii 07subriteted to the Oen•reriOl o"i6t1210p A Copyhon.th ACc in

piowided ri lA/achimet 2.CO o 0.085 ithr. Maximum emission rate from None. None. On May 22. 20055 the Dparlir:itpreconstrection permit. [N.J.A,C. 7:27-22.16(e)) anI PSEG Nuclerir enitored rt aAdiriinstralive Conseirt Orrer, thrtStayed the emrinsio limits for the

Guardhouse Standby Diesel EngtileU 33 OS1 S In Compliance Station Records No and the Scania Diesel Fire Pump

(U33 and U35). A permit applicationto coirect the emission limits wassubmitted to the Department on6lt2108. A copy of tIe ACO is

provided in Attachment 2S02 -= 01734 Ib/hr, Maximum emission limit based on None. None. On May 22. 2008, the Oeporlnentthe preconstruction permit [N J.A C, 7 27-22.16(e)l arid PSEG Nuclear enirered into .

Adiroisrlrative Con-rir lhr !Stayed tie eiii i lirinr tar Sh

Giiarlihoun Staiduy " irr"' ," nineU 33 OSt 6 In Compliance Station Repord& No earl th So ir'iTsel tin lonp

(133 arid U35y A pýrmiit apprliruioito conrrot thn Cmiiissori iilmsi iron

surnllned to the)opniijii rrVIf203, A copy of lhe ACID is

provided ini Altnclrrhmnit 2.

of S0

S oirr 6 ce StatusSP000t~ t.IC

I lor Cnr 1.-k rinI •rtrid Dcrr alinig Sta tirc,

Coepliance Status Method to ft a C PomlianceRef # Applicable Requirement Monitoring Requirement Recordieeplng Requirement (In Compliance Oeterminee 89ttae CommentsNon-Compliance) Compliance Attached? (Yes....

TSP <BT. xnimur e'nission rate from rNone. None .Ot May22. 200$. Ihn CnritpreConstruction permit IN.J.AC. 7A27-22.16(e))

and PSEG Nuclear enrered mito aAdlrrisnatioe Cn•nsent O4<s thatStnyed the erission linits for Ihe

Goarrhnouse Standby Diesel EnrgineU 33 OS1 7 In Compliance Station Records No and the Scaria Diesel Fire Pnrp

(U33 and U35). A permit applicationto Mirect the emission limfit watsubmitted to the Departrrent on6112103. A copy of tire ACO is

provided in Altacftnert 2.PM-1M0 (Total): <1T. Maximum emission rate frer Nrone. Nrner On May 22. 20080 tire Dcnoj;tr_•ilP)econstrrction permit N.J.A.C. 7:27-22.16(e)) and rSEG Nuclear entered nto a

Adrrrnics!,rioe Consent Order, thatStayed tie emission limits for t•re

Guardhouse Standby Diesel EngrreU 33 OS1 8 In Compliance Station Records No and tire Scania Diesel Ft"r Punrp

IU33 and U35) A permit applicationto correct fire errissinn limrits <assubiroted to the Deoartaenr on6/12108. A copy ot tle AGO is

provided in Altachrment 2.Generator fuel limited to low sulfur distillate oil. Monitored by review of fuel delivery records per Recordlreepirg by manual logging of patameter perU 33 OSI 9 IN.J.A.C. 7.27-22.16(el) delivery. Review bills of ladinglinvoices. [N.J.AC. delivery in permanently bound logbook or readily In Compliance Station Records No7:27-22.16(o)) accessible computer memory. IN.J.A.C. 7:27-22,16(o))

Maximnur Gross Heat Input v= 2.38 MMBTU/hr (HHV). Other: Fuel burner rated capacity [N.JA.C. 7:27- None.U 33 OS1 10 Maximum gross heat input, based onl the 22.168o)]. In Compliance Station Records Noprecanstruction permit. [N.J.A.C. 7:27-22.16(e)l

The Emergeecy Generators as defined in N.J.A.C. None. Recordkeepirrg by manual loggirg of parameter upon7:27-19.1 cannot be used for load shaving peaking occurrence of event The permittee shall record inpower production, or generation in an agreement with a eitlher a permanent bound log book, or in readily

U 33 OS1 11 utility energy assistance program. IN.J.A C. 7:27- accessible computer menoties, each occurrence of In Compliance Station Records No22,16(a)] stirt-up date, duration of emergency generatoroperation and reason and the name of the personmraking the entry. [N.J A.C. 7:27-22,16(o)]

Opacity -= 20 %. Smoke emissions from stationary None. None.irterrral combustion engines no greater than 20%

U 34 aS0 1 opacity, exclusive of visible condensed water vapor, In compliance Station Records Notar more than 10 coesecative seconds. [N.J.A.C. 7:27-Sulfur Content it Fuel n= 0.3 % sulfur by weight. Sulfur Content in Fuel: Monitored by review of fuel Sulfur Content in Fuel: Recordkeeping by fuelO aximum allowable sulfur content in fuel oil by fuel delivery records per delivery. [N.J.A.C. 7:27-22.16(o)l certification receipts per delivery showing sulfurU 3d SO 2 typetviscosity arnd geographical zone (Salem County), rontent. [N.J,A.C. 7:27-22.16(o)] In Compliance Station Records No)N.JA.C. 7:27- 9.2(b)]Opacity v 1o %. Smoke erissions noi greater fhan None. None.

U 34 a00 3 10% opacity, exclusive of condensed water vapor. In Compliane Station Reords Nobased on the preconsttaction permit. [N.J.A.C. 7:27-

NOx (Total) < 0.2 tonsfyr. Annual emission limnit None. None.U 34 OSO 4 based onr maximum hourly emission rate and 100 frrtyr In Compliance Station Records NOoperation. [N.J.A.C. 7:27-22,16(a)]

CO <= 002 tons/yr. Annual emission limit based on None. None.U 34 OSS 5 maximum hrourly emission tate and 100 hrtyr

In Compliance Station Records Nooperationr (N.J.A.C. 7:27-22.16(a)]

S02 -= 0.05 tons~yr. Annual emission limit based oal None. None.U 34 050 6 maximum hourly emission rate and 100 Ortyr

In Compliance Station Records Nooperation. [N.J.A.C. 7:27-22.16(a)]

Generator fuel limited to #2 fuel oil or lighter IN.J.A.C. None. None.U 34 OSO 7 7:27-22.16(a)) -In ý.repliance Station Records No

Total flours of Operation cv 10t hrlyr. Maximum Total Iaours of Operation: Monitored by houritine Total lours of Operationr: Recorlkeeping by manualannual operating time based on operating permit monitor continuouslyp based on one calendar year. cogging of parameter each month during operation.application. [N J A C. 7:27-22.16(a)] The permittee shall install. calibrate and maintain in Phe permitlfee shall record in either a permanent bound

accordance with the manufacturer's specifications. a tog book, or in readily accessible computer memories.U 3d OSO 8 totalizing hour meter to monitor the total hours of the monlhly hours of operation of the generator and In Compliance Station Records Nooperation per year for the generator. IN.J.A.C 7:27- made available to the representatives of tre22.16(e)) Department of Environmental Protection upon request.

(N.J.A.C. 7:27-22.16(o)]

Page 20 of 80

Shetion 6 - Cfmplniance StafosPPEG N-'ra I,..C

I lopr C -1r, and Rtyfrm Ge ra lirrg Stations

Compliance status Method to 1s. ComoplonceRef # Applicable Requirement Monitoring Requirement Recordkeepfng Requirement (In Comptlance Deternnmin Schedule CommenrtsNon-Coimpliaince) Compliance Afttched? (Yes/No)

The Emergency Generators as defined in NJ A.C None, Recordkeeping by manual logging of parameter uponTV:-% 1 cannot be used for load shaving. peaking occurrence of event The permittee Shall record inpower production, or generation in an agreement with a either a permanent bound tog book, or in readityU 34 OS0 Jutility energy assistance program. [N.J.A.C. 7ý27 accessible computer memories, each occurrence of In Compliance Station Records No22.16(o)]

start-up date, duration of emergency generatoroperation and reason and the name of the personmaking the entry. )N.J.A.C. 7:27-22.16(o))

1 Maximum Gross Heat Input = 3,13 MMBTU/hr (HHV) Other: Fuel burner rated capacity.NNJA.C. 7:27- None.U O 10 N.JA C 7:27-22.16(a)j 22.16(.]o, t Compliance Station Records No

Opacity - 20 %. An emergency diesel generator that None. None.is located at a facility that generates electricity fromnuclear power and that is subject to regulation by theNuclear Regulatory Commission is exempt from theprovisions of NJ.A.C. 7:27-3. However. this exceptionfrom the applicability of this subchapter shall applyonly as follows:i During a test mandated by the Nuclear RegulatoryCommission; orii. During a period when off-site supply of electricity is

U 34 OS1 1 not available due to causes outside the control of the In Compliance Station Records Noowner or operator of the facility and operation of the

generator is needed for the protection of public healthor welfareIf these exemption periods do not apply, no personshall cause, suffer, allow or permit smoke greater than20% opacity, exclusive of visible condensed watervapor. to be emitted into the outdoor air from thecombustion of fuel in this unit except for a period of notlonger than 10 consecutive Seconds [N.J.A.C. 7:27-3.7(a)41

Particulate Emissions 0= 1.88 Wbthr. Particulate None. None.U 34 Ot 2 emission limit from the combustion of fuel based on

In Compliance Station Records Norated heat input of source. (N.J.A.C. 7:27- 4.2(a)]U 34 CST 3 IVOC (Total) s= 0.17 Ibihr. IN.J.A.C. 7:27-22.16(a)) None. None. In Compliance Station Records NoU 34 OST 4 NOx (Total) o 4 lbthr. [N.J.A.C. 7:27-22.16(a)] None. None. In Compliance Station Records NoU 34 OSt 5 CO - 0.33 tbfhr. (N.J.A.C. 7:27-22.16(a)1 None. None. In Compliance Station Records NoU 3d CST 6 S02 = 0.96 Wbihr. (N.J.A.C. 7:27-22.16(a)) None. None. In Compliance Station Records NoU 34 0C1 7 TSP: BT. [N.J.A.C. 7:27-22.16(a)] None. None. In Compliance Station Records NoU 34 0S1 g PM-10 (Total): <01. [N.J.A.C. 7:27-22.16(a)) None. None, In Compliance Station Records NoEmissions of all other air contaminants including HAPs None. None.U 34 051 9 are below the respective reporting thresholds per .

N.J.A.C. 7:27-22 Appendix Tables A & B. N.J.A C. In Compliance Station Records No7:27-22.16(a))NOx (Total) s= 0.07 tonsyyr. Annual emission limit None. None.

Ot May 22. 2008: the Departmrentbased on preconstruction permil maximum hourly and PSEG Nuclear entered into aemission rate and 500 hrtyr operation. [N.J.A.C. 7:27-

Administrative Consent Order, that22.16(e)) Stayed th1 errsicar tirrthe fo, 'n

Guardhouse Ctardoby Oienel EnrrirU 35 OS 1 In Compliance Station Records No and the Scarril Oiesnc Fire houny

(P23 and U35). A pwrit inpric,!ic-to correct th1 enriision imirt v an

rubmited to lhe Doeprtrrnt orr6112108. A coy 0of thre ACO in

provided !,r Altachmnent 2.CO 0- 0016 tons/yr. Annual emission limit based on None. None. On May 221 2008. The Depatlnrntpreconstruction permit maximum hourly emission rate and 0SEG Nuntrau entered into aand 500 hrlyr operation. )NJA.C. 7:27-22.16(e))

Adminislirtive Consnent Ordor that

Stayed the emission limits sir theGuardhouse Standby Diesel EngineU 05 00 2

In Compliance Station Records No and the Scania Diesel Fire Pump(U33 and U35). A permit applicationto correct the emission limits wassubmitted to the Department on6112108. A copy of the ACO is

provided it, Attachment 2.

ea 00

11#Complitanen Statu, Method to to. C.mpltanse"Applicable Requirement Monitoring Requirement Reeordkeeptng Requirement (In Comprpine Sbchedent Comments•l•nCoplane) Comeiplianc Attalched? (Ycisf~o)

S02 n= 0.137 tonstyr. Annual emission limll based on None. None On May 22. 2008: the Departnmentpreconstruction permit maximum hourly emission rate and PSEG Nuclear entered int aand 5nD hr/yr operation, (N.J.A.C. 7:27-22 16(e))

Adnrinisltative Consent Order. thatStayed the emission timis for the

Guardrollse Standby Diesel EngineU 35 OS0 3 In Compliance Station Records No and ttre Scania Diesel Fire Pump

(U33 and U35). A permit applicationto correct the enrissio• timlts wassubhnmited to tfi Deparhment or,6112108. A copy of tile ACO is

provided in Attactrment 2.Total Hours of Operation 5 500 hr/yr each. Maximum Total Hours of Operabon Monitored by hoyt/time Total flours of Operation: Recordheeping by roanualannual operafing time based on operating permit monitor continuously. based on arm calendar year. logging of parameter each month during operation.application [N.J.AC. 7:27-22.16(a)] The permittee shall install, calibrate and maintain in The permiftee shall record in either a permanent bound

accordance with the manufacturers specificatiorns. a log book. or in readily accessible computer memories.U 35 OS00 totalizing hour meter to monitor the total hours of the monthly hours at operation of the generator and In Compliance Station Records Nooperation per year for the generator. IN JAC. 7:27- made available to the representatives of the22.16(e)] Department of Environmental Protection upon request.

[N.JA,C, 7:27-22 l6(o)(

Opacity<=20%" An emergerrcy diesel generator that None. None.is located at a facility that generates electricity fromnuclear power and that is subject to reguladon by theNuclear Regulatory Commrission is exempt froor theprevisions of N JAC. 7:27-3 However. this exceptiontrom the applicability of this subchapter shall apply

tnly as follows:During a test mandated by the Nuclear Regulatory

Commission: orit During a period when off-site supply of electricity is

U 35 OS 1 not available due to causes outside the control of the In Compliance Station Records Nnowner or operator of the facility and operation of thegenerator is needed for the protection Of plrio healthor welfare.If these exemption periods do not apply, no personshall cause, suffer, allow or permit smoke greater than20% opacity. exclusive of visible condensed watervapor, to be emitted into the outdoor air from thecombusbon of fuel in this unit except for a period of notlonger than 10 consecutive seconds. IN.J.A.C. 7:27-3.7(a)41

Partficulate Emissions - 1.26 Ibshr. Pabticulate None. None.U 35 OS1 2 emission limit front the combustion of friel based on In Compliance Station Records Norated heat input of source. [N.JNA.C. 7:27- 4.2(a)]

Sulfur Content in Fuet < 03 % sulfur by weighlt. Sulfur Content in Fuel: Monitored by review of fuel Sulfur Context irr Fuel: Recordkeeping by tuelMaximum allowable sutfur contenl in fuel oil by fuel delivery records per delhery. [N.J.A.C. 7:27-22. 16(o)] certification receiprl per delivery showing sulfur

U 30 D Ot1 3 ltypetviscoity and geographical zomm (Salem County). content. [N.J.A C. 7:27-22.16(.)] tn Comryiance Station Records No[N.J.A.C. 7:27- 9.2(b)]NOx (Total) -n 0 279 tb/tsr Maxirnmum emeissiorn Iinlit None. None. On May 22, 2008. the Depanmentbased on preconatraction permit. [N.J.A.C. 7:27-

and PSEG Nuctear entered into ,_22,16(e) Administrative Corsent Order. tratStayed the emnission limits Ior the

Guordhorxsc Standby Diesel EnrgneU 35 0Sl In Compliance Station Records No and tile Scaria Diesel File Purrp

(033 and U335) A permit applicationto correct tfre rrissior lirrts "w ssumittriled to tie Dhepurtrrrarl! ue

f1o2/08 A copy of tire AcO inprovudnd ir Attachmernt 2.

Page 22 of 60

Sectiof 6 - Copliance StatusPtEC Nuclear LiC

I Ripe Creek and Sailer Generating Statiains

Compliance Stains Method to in ComplianenRef# Applicable Requirement Monitoring Requirement Recorikeaping Requirement (In Compilanco Determine Shedule CommentsNonr-C.mpiliance) Coorplian-e Attached? (yes/No)

CO - 0.064 lblrr. Maximum emission rate from Norte. None On May 22. 2008, tire Departmentpreconstruction permit [N JAC. 7:27-22 16(eo) and PSEG Nuclear entered into aAdministrative Consent Order, thatStayed the emission limnits for the

Guardhouse Standby Diesel EngineU 35 OS1 5 In Compliance Station Records No arrd the Scania Diesel Fire Pumnp

(U33 and U35). A permit appltatiorrto conect the enission limits wassubmitted to the Departrment on6112J08 A copy of the /CO is

prnvided it Altactu.e. rt 2.S02 -= 0.549 tb/hr. Maximum emission limit based on None. None. On May 22. 2008. the Departmentthe preconstruocion permit. [N.J.AGC. 7:27-22.16(e)) and PSEG Nuclear entered vi, m

Administratiie Consent Ordet. iratStayed tire emission limits fr the

Guardhouse Standby Diesel EngineU 35 OS1 6 in Compliance Station Records No and the Scania Diesel Fite Purrp

(U33 and U35). A permit applicationto correct the emission limits wassubmitted to the Department on

6i12108, A copy of tie AcO isprovided in Attachmert 2.TSP: <1T. Maximum emission rate from None. None.preconstruction permit. [N.J.A.C. 7:27-22.16(e)

aOrd PSEG Nuclear e0rted De nto a

Admiristrative Consent Order, thrtStayed the emiss•io limit$ for the

Grarthouse Standby Diesel ErgiroU 35 OS1 7 In Compliance Station Records No and the Scaona Diesel Fine Prurp

(0i33 aind U35), A perrrit applyatiomto correct the emission tirits wiss minnitted to the Oepartweot on6i12/08, A copy of the ACO is

provided in Attaclhrmet 2.PM-10 (Total): <6T. Manirum emission rate from None None Or May 22, 2000. tre Dnyartrnrtpreconstruction permit [NJ.A.C. 727-22 16(e)) and PSEG Nuclear entered into aAdministrative Consent Order, thatStayed tile emission limits for the

Guardhouoase Standby Diesel EhgineU 35 OS1 6 In Compliance Station Records No and the Scania Diesel Fire Pump

(U33 arrd U35). A perrit epplicatinrto co rrec t the emis sion lirits wassubmitted to the Deparwrnt on

6112/08. A copy Of thi ACO ispronide in Atrnchmrnmt 2.Generator fuel limited to #2 fuel oil. N.J.A.C. 7:27- Monitored by review of fuel delivery records per Recordkeeping by manual logging of parameter perU 35 OS1 22,16(e)] delivery. Review bilts ofiadingoinvoices. [NJAC.. delivery in permanently bound logibook or readily In Compliance Station Records No7:27-22.16(o)] accessible computer memory. [N.J.AC. 7:27-22.16(o)]

Maximum Gross Heat Input o= 2.1 MMBTUIhr (HHV). Other: Fuel burner rated capacily,[N.J.A.C. 7:27- None.U 35 0O1 10 Maximum gross (teat input, based on the 22.16(e)].

to Compliance Station Records Nopreconstruction permit. [N.J.A.C. 7:27-22.t6(e) _The Emergency Generators as defined in N.J.A.C. None. Recordikeeping by manual logging of parameter upon7:27-19.1 cannot be used fot load shaving, peaking occurrence of event. The permnitee shall record inpower production, or generation in an agreement with a either a permanent bound log book, or in readilyU 35 OS1 t I utility energy assistance program. [N.J.A.C. 7:27- accessible computer memories, each occurrence of to Compliance Station Records No22.16(a)]

start-up: date, duration ofemergency generatoroperation and reason and the name of the pemsonmaking the entry. [NJA.C. 7:27-22.16(o)l

VOC (Tot01) - 0.79 tonslyr. Annual emission limit None. None.U 36 OSO I based on maximum of 2,000 hourslyear operaton of

In Compliance Station Records Nothe compressor. [N.J.A.C. 7:27-22.16(e))NOx (Total) <- 9.67 tonstyr. Annual emission limit None. None.

U 36 U00 2 based on maximum of 2.000 hourslyear operation of In Compliance Station Records Nothe compressor. [N.J.A.C. 7:27-22.16(e)]

U 36 1OSSI 1CO <= 2.08 tonslyr. Annual emission limit based onmaximum of 2.000 hourslyear operation of thecompressor. [N.J.A.C. 7:27-22.16(e))

Non}e. None,

In Compliance Station Records No

t0180 0

Sentirn 6 -*o Slb9

I -lrp C.irek adtn t bsnortang St-atin

Compliance Status Mithlod to Is a Compliance

Raf # Applicable Requirement Monitoring Requirement Recordkeeping Requirement (In Compliance Determine Schedule CommentsNoGrn-Comlianc) Compine Attached? lYes/No)

S02 0,A5 tons/yr Annual emission linet based on None. None.U 36 OS0 4 sf2ximum of2.000 hours/year operation of the In Compliance Statrn/ Records No

compressor. [N.J.A.C. 7:27-22.16(e))TSP - 0.68 tons!yr. Annual emission fioit based on Nome None.

U 36 OSO 5 mraximum of 2.000 hours/year operation of the In Compliance Station Records Nocompressor, [NJ.A.C. 7:27-22.16(e)/

PM-t0 (Total) / 0 68 tons/yr. AInnal emission limit None. None.bSased on maximum of 2,000 mours/year operation ofI

U 36 0S0 6 the compressor. [N.J.A.C. 7:27-22.16(o)l t Compliance Station Records No

Total Hours of Operation -s 2,000 hrtyr eachr Total Hours of Operation. Monitored by hou/lirne Total Hoots of Operation: Recordkeepieg by manualMaaximum annual operating hours based oni niotor continuously, based oir one calendar year, logging of parameter each month during operationnpreconstruction permit. [NJ.A.C. 7:27-22.16(e)) Tire permittee shall install. calibiate and maintain in The ;rnittee s/ia/l record in either a permnanend bnlnd

cordairce wi/th tie manufacturer's specnfications, a log book. or in readily accessible computer memories.

U 36 OS0 7otalizing hour meter to moni/or the total hours of the monthly hours o0 operation of t/e compressor and In Compliance Station Records Nooperation per year for the compressor. [NIJ.AC, 7:27- made available to the representatives of the22.16(e)) Departmenl of Erivironmental Protection upon request

for a period of five years after the date of each record.INJANC, ?:27-22.16e)l

Opacity - 20%. Visib/e emissions from diesel engine Opacity: Monitored by visual de/erminration each Opacity: Recordkeeping by manutl logging ofno greater than 20% opec//pty. Oeusive of visible mronth dudng operation, based on an instantaneous Parameter each month during operation (in acondensed water vapor. except for a period of not determination For compliance with the opacity r'nernaer••ly bound lonhook or other electronic datalonger than 10 consecutive seconds (NJA C. 7:27- standard, the permettee shall conduct visual opaciby iranagement system) and retain the following3.5] inspections during daylight hours. Visual inspections records

shall consist of a vistal survey to identify if the stack () ID ate and bnie of inspection;has visible emissions, exclusive of visible condensed f2) Etnission point number:water vapor, to be greater than prescribed standard. If /3) Operalional status of the equipment;visible emissions are observed, lhe perts/Aýneshall do (4) Observed resusis and concilsions,

the following: (5) Description of crrective action taken d needed;

(1) Verify that the equipsment and/or control device (6) Date and time opacity problem was solved, ifcrusinglcontrol/iog the emission is operating according app/icable:

U 36 00/ 1 to manufacturer's specifications and the operating (7) NJA.C. 7.27B-2 results if conducted: and I. Compliance Station Records Nopermit Compliance plan. If the equipment or control (8) Name of person/s) conducting inspection. (N.JA.C.device is not operating properly, the permittee shall 7:27-22.16(o)]take corrective action immediately to eliminate (i/eexcess emissions Ihe por//tee must report anypermit violations to NJDEP pursuant to NJAC. 7:27-

(2) 1/Rthe cottecri/e acton taken in step (1) does not

correct the opacity problem within 24 hours, theapplicant shall perform a check via a certified cp,-cityreader, in accordance with N.J.A.C. 7:270-2. Such testshall be conducted each day un/il corrective atien istaken to successfully correct the opacity problem.N.J.A.C. 7:27-22.1/(o)]

Poticulale Emissions <= 1 75 lbthr. Pan/cuate None. None.

U 36 OS 1 2 emission limit from the combustion of fuel based on In Compliance Station Records Norated heatinput of source. IN.J.A.C. 7:27-4.2a)0l

So/far Coo/on/in Fuel - 0.3 % sulfui by weight. Sulfur Content in Fuel: Monitored by review of fuel Sulfur Content in Fuel: Recotdkeeping by fuelMaximutt allowable sulfur content in fuel oil by fuel delivery records per delivery, [N.J.A.C. 7:27-22.16(of) rertifica/ion re.eipts per del/very showing s/nl/ur

U 36 001 3 lypelvisconity and geographical zone (Salem Countys. content (N JAC. 7:27-227/0/)] In Compliance Staltro Records Ho/N.JA.C. 7:27- 9.2(b))

Page 24 of 80

Section 6 - Compliance StatusPtEG N 1c1,'ac IC

Ittrpe Cr-1k and &irlen Generating 5tati-s

Compliance Statan Method to is a ComplianceRef ( Applicable Requirement Monitoring Requirement (in -omptian" Determine schedule commentsN-Conmpliance) Comrpliance Attached? (YesNoy

Opacity -o 10 %. The equipment in this permit shall Opacity: Monitored by visual determination each Opacity: Recordkeeping by manual logging ofnot be used in a manner which will cause visible month during operation. based on an instantaneous parameter each monath during operation (in aemissions (except for three minutes and 10 seconds dntetermlation. For compliance with the opacity permanently bound togbook or other electronic datafor a period of 30 minutes during start-up which opacity standard, the permistee shall conduct visual opacity management system) and retain the following records:shall not exceed 10%), exclusive of condensed water inspections during daylight hours. Visual inspections (1) Date and time of inspection;vapor. INJ A.C. 7:27-22.16(e)] shall consist of a visual sumvey to identify if the stack (2) Emission point number:has visible emissions, exclusive of visible condensed (3) Operational status of the equipment:water vapor, to be greater than prescribed standard, If (4) Observed results and conclusions:visible emissions are observed, the permittee shall do (5) Description of corrective action taken if needed;the following: (6) Date and time opacity problem was solved. i(1) Verify mhat the equipment and/or control device applicable:causinglcontrolting the emission is operating according 17) NdJ.A.C. 7:278-2 results if conducted; and

U 36 OS1 4 to manufacturer's specifications and the operating 18) Name of person(s) conducting inspection. [N J A.C In Compliance Station Records Nopermit compliance plan. If the equipment or control 7:27-22.16(o))device is not operating properly, the permittee shalltake corrective a0cion immediately to eliminate theexcess emissions. The permittee must report anypermit violations to NJDEP pursuont to NJ.A.C. 7:27-

t2) Ifthe corrective action taken in step (i) does notcorrect Me opacity problem within 24 hours, theapplicant shall perform a check via a certified opacityreader, in accordance with N.JA.C. 7:27B-2. Such testshall be conducted each day until corrective action istaken to successfully correct the opacity problem,[N J.A.C. 7:27-22.16(o)]

VOC (Total) 0= 5.79 lbfhr. Maximum emission rate None. None.U 36 0S1 mfrom preconstruction permit. )N.J.A.C. 7:27-22.16(e))

In Compliance Statin Records NoNOx (Total)= 9.67 lb/hr Maximum emission limit None. None= U 3•6 OS1 6I based on preconstruction permit. )N.J.A.C. 7:27- .fr Cnrriince Station Records NoU CO -= 2.08 lblhr, Maximum emission rate from None. None. - tU 3 01 7 peconstruction permit. [N.J.A.C. 7:27-22.t6(e)t

In Compliance Station Records NoS02 v- 0.45 lblhr. Maximum emission hint based on None. None.U 36 OSt 8 the preoonstruction permit. .N.J.A.C. 7:27-22.16(e))

In Compliance Station Records NoTSP 0 0.68 tb/hr. Maximum emission rate from None. None. In Compliance Station Records NnU 3 OSI 9 prconstmction permit. [N.J.A.C. 7:27-22.16(e)l

Io__omplianceStationReordsNOPM-10 (Total) c- 0.68 b/hr. Maximum emission rate None. None.

U36 OS 0 fo rcntuto emt NJAC :72.6e]In Compbliance Statinn Records NoU O~~i . ~from preconslrucfon permilt. )N.J.A.C. 7:2-22.16(e))fl ___________________

Generator fuel limited to tow sulfur distillate oil. Monitored by review of fuel delivery records per Recordkeeping by manual logging of parameter per[NJA.C. 7:27-22.16(e)] delivery. Review bills ofladinglinvoices [N.J.A.C. delivery in permanently bound logbook or readilyU 36 OS1 If 7:27-22.16(o)] accessible computer memrsry. (N JA.C. 7T27-22.16(o)) In Compliance Station Records No

Maximum Gross Heat Input - 2.93 MMBTU/hr (HHV). Other: Fuel burner rated capacity [N.J.AC. 7:27- None.U 36 OS1 12 Maximum gross heat input, based on operating permit 22316(e))

In Compliance Station Records Noapplication )N.J.A.C. 7.27-22.16(e)I

VOC (Total) -= 0.72 tonstyr. Annual emission limit None. None.U 27 SS0 based on maximum annual fuel use. [N.J.A.C. 7:27- In Compliance Station Records No

NOx (Total) -= 26 4 tons/yr. Annual enrission lired None. None. In Compliance Station Records NoU 37 aS0 2 based on maximum annual fuel use. [N.J.A.C. 7:27-

CO 3= 6.6 tons/yr. Annual emission limit based on None. None.U37 aSS maximum annual binW use. [N.J.A.C. 7:27-22.16(al) In Compliance Station Records No

S02 = 37,48 tonslyr. Annual emission limit based on None. None.U 37 a05 4 maximum annual fuel use. IN,J.A C. 7:27-22.16(a)) In Compliance Station Records No

TSP - 2.64 tons/yr. Annual emission limit based on None. NoneU 37 OS 5 maaximum annual fuel use. [NJA C. 7;27-22.t6(a)j In Compliance Station Records No

PM-I0 (Total) - 2.64 tons/yr. Annual emission limit None. NoneU 37 OS0 6 based on maximum annual fuel use. [N.J A C. 7:27-

In Compliance Station Records Ni22.16(a)]Lead compounds -= 0.002 tons/yr. Annual emission None. None.

U 37 aSO 7 limit based on maximum annual fuel use, [N.J.A.C. In Compliance Station Records No7:27-22.16(a)]

Arsenic compounds -= 0001 tonstyr. Annual emission None. None.U 37 OSO 6 limit based on maximum annual fuel use. [N.J.A.C.

In Compliance Station Records -o7:27-22.16(a)]

Polycyclio organic matter - 0,005 tons/yr. Annual • None. None.U 37 OSO 9 emission limit based on maximum annual fuel use.

In Compliance Station Records No[N.J.A.C. 7:27-22.16(a)] I I

I

0 . 0160

Se finrhQe 6ttt

I Irap• Crck rod ccerrrtirog Sta miplinc

Cor plian ce Stat"s Method to h, a Co pollaneoRef # Applicable Requirement Monitoring Requirement Recordrkeeping Requirement (tn Compliane Detererine Schedule Commertsron-Conpllae) Compliance Aftactred? (Y'scltn

Total fours Of Operation - 8.000 hr/yr for both boilers total I ours of Operation: Monitored by houa/time Total flours of Operation: Recordkeeping by manualcombined. Maximum annual operating hours based on monitor continuously, based oni one calendar year. logging of parameter each month during operation.

rec•onstruction permit. jN.J.A C. 7:27-2216(e)] The periritree shall install, calibrate and maintain in The permitee shall record in either a permanent boundaccordance with the manufacturer's specifications, a log book, or in readily accessible computer memories.

U 37 OSO 10 totalizing hour Pieter to monitor the total heros of tfie rmonthly hoors of operation of the boiler and made In Compliance Station Records Noop eration per year for the generator [N.J.A.C, 7:27- available to the representatives of the Department of22.16(o)] Environmenfal Protection upon request for a period of

five years after the date of each record. [N.J A C. 7:27.22.16(o)0

Fuel Oil Usageý Tre annual aggregate tor sulfur Other: Comtpliance with Otis conditior shall be Other: An operatong log book or electronic datadistillate oil consumption for tie boilers (U37 and U38) derntonstrated by operation of a flow meter storage system shall be kept to accurately maittain theshall be limited to 2 64 million gallons per any period of continuously based on a consecutive 12 toonth period IonTly fuel usage. Gatlons per consecutive 12-rnonth12 consecutive roonths. Maximum annual fuel usage (rolling one month basist,[N.J A.C. 7:27-22.16(o)]. period srall be calculated by the suer of the gallonslimit based on operating permit application, [N.J.A.C. consumed during any one month added to the surm of7:27-22.16(.al the gallons consumed during the preceding 11 months.

This procedure will begin wilh the first full monthU 37 fS0 1ioowing the feat;l issuance of the Operating Permit. In Compliance Station Records No

TIis accounting cill not include oil consuetption duringmronths tifior Io the approval of the Operating Perrit.The petroi•ee will select the time period firaccounting, such as fiscal month, calendar month orproduction month. Once selected. tIhe period must notbe changed without prior approval fromNJDEP(N.J.A.C. 7:27-22.16(o)].

No visible enissions exclusive of visible condensed Other: Visual Determinaton. Weekly when burning low Other: Manual lcgging of observations in amater vapor. except for a period of not longer than sulfur distillate oil The permittee shall conduct visual permanently bound logbook or readily accessiblethree minutes in any consecutive 30-minute period. opacity inspectons during daylight hours. Visual computer oeremry. Weekly when butenig low sulfurN.J.AC.7:27-3.2(a)] & [N.J.A.C. 7:27- 3 21ct) inspections shall consist of a visual survey to identify it distillate oil. The permittee must retain the following

tlre stuck has visible emissions. (other than condensed records; (1) Date and time of inspection: 12) Emissionwater vapor), greater than the prescribed standard. If Point number: 13) Operational status of equipment:visible emissions are obse;ved, the pecmillee shall do (4) Observed results and conclusions; (5) Descriptionthe following: ( 1) Verify that the equipment and /or of correctine action taken if needed; (6) Date and timecontrol device causing the emission is operating opacity problem was selved, i0 applicable, (7) N.J.A.C.according to manufacturers speciftaations and the 7:278-2 results if conducted: and (8) Name ofoperating permit compliance plan. If the equipment or person(s) conducting inspecton IN.J.A.C 7:27-control device is not operating properly. the pearittee 22 16(o)l.U 37 0S1 1 shall take corrective action immediately to eliminate In Comptiance Station Records Nothe excess emissions The permittee must report anypermit violation to NJOEP pursuant to N.J.A.C. 7:27-22.10, (2) If the corrective action taken in step onedoes not correct Ihe opacity problem within 24 hours.Ihe permittee shall perform a check via a certified

accordance witl NJ A C. 7.97B-2 Such a test shallbe conducted once per day until corrective action istaken to successfully correct the opacity problem Thepermtnttee must report any continuing permit violationto NJDEP pursuant to N.J.A.C. 7:27-22.19 (N.J.A.C.7:27-22.16(0)1

Particulate Emissions 1= t0S tb/hr. Particulate None. NoneU 37 OS1 2 emission limit from the combustion of fuel based on In Compliance Station Records Norated heat input of source. [N.J.A.C. 7:27- 4.2(a)]

Sulfur Content in Fuel: v= 0.3 percent by weight, Sulfur Content in Fuel: Monitored by review of fuel Sulfur Conmtent in Fuel: Recordheeping by fuelMaximum allowable sulfur content in fuel oil by fuel oil delivery records per delivery JN.,JA.C. 7:27-22.16(e)] certification receipts once per bulk fuel shipment, KeepU 37 ST1 3 typelviscosity and geographical zone. [N.J.A.C. 7:27- records of invoioeioblls of lading showing fuel sulfur In Compliance Station Records No9.2(a)] content. Per delivery. (N.J.A.C. 7:27-22.16(e))

P•ge 26 of 80

acvtion 6 - C-nrpriance Stan'sP5frG N4'0ar ILC

I thpo Creek ant-i,1-m Genrrting Stariturs

Cornpliance Stats, Method to is t ComrplicnreRef Applicable Requirement Monitoring Requirement Recordkeeptng Requirement (In Compliance Determine Schedule CommentsNo-Cor-pliarco) Compliance Attached? (YeolNo.

Adjust the combustion process in accordance with Other: Adjust combustion process by boaer tne-up. Recordkeeping by manual logging of parameterNJ.A C.7:27-19.16 each calendar year. Record NOx Arnnually.[N.J.A.C. 7:27-16.8(c)]. annually in a permanently bound logbook or readilyand CO conc after each adjustment and the 02 conc. accessible computer memory containing the followingat which NOx and CO were measured. [N.J.A.C. 7-27- information for each adjustment:16.8(c)) 1, The date of the adjustment and the times at which it

hegan and ended;2. The name, Itte and affiliation of the person whomade the adjustment;3. The NOn concentration in the effluent stream, ineither ppmv or ppmvd: after each adjustment wasmoade.4. The CO concentration in the effluent stream in either

U 37 OSt1 4 ppmv or ppmvd. after each adjustment was made; In Compliance Station Records No5. The concentration of 02 at which the CO and NOxconcentrations pursuant to the steps 3 and 4 weremeasured; and6. Any other information which the Depadment or EPAhas required as a condition of approval of any permitor certificate issued for the equipment or sourceoperation. [N.J A.C 7;27-16 8(c))

U 37 OSi VOC ITotal) 0=0.18 b1hr. Maximum emission limit None. None. to Compliance Station Records Nobased on preconstrastion permit. (N.JA.C. 7:27-NOn (Total) = 6.6 lblhr. Maximum emission limit None. None.U 37 OSI 6 based on precconstrwction permit. [N.J.A.C. 7:27-

In Corpliaece Station Records NoCO -o 1.65 tb/hr Maximum emission rate based on Nene. None.operating permit application [N.J.A.C. 7:27-22.16(a)]nS02 = 9.37 tblrr. Maximum emission limit based on None. None.U 37 OSt 8 ,reconstruction permit [N.J.ACý 7:27-22.16(e)]

In Compliance Station Records NoISP <= 0.66 lb/hr. Maximum emission limit based on None. None.U 37 OS reconstructionplance

Station Records NoPM-Id (Total) <- 066 lb/hr. Maximum emission limit None. None.

U 37 OS1 1 based on preconstruction permit. [N.J.A.C. 7:27- In Compliance Station Records No

Uoiler fuel limited to low sulfur distillate oil. JN.J.A.C. None. None.U 37 061 11 t:72.1() n Compliance Station Records No7:027-22.1 6(el))____________________

Maximum Gross Heat Input - 46.2 MMBTU/hr (HHV). Other: Fuel burner rated Rcpacry.sN.J.A.C 7:27- None.U 37 OS1 12 OthrA.Cl7:2e-2at16(e)} 22.16(7:7-In

Compliance Station Records No)N.J.A.C 7:27-22.tdlel( 22.lf6le)],_____________________Start-up shall be defined as the period from beginning None. Noneof fuel ignition until the flame of the burner reachesstabilization. The duration of the exemption from theemissions limits specified in this permit shall not

U 37 OS1 13 exceed 30 consecutive minutes In Compliance Station Records NoPlease note that the above exemption does not apply

to the RACT emission limis described in N.J.A.C. 7:27.[N.J.A.C. 7:27-22.16e))

Shutdown shall be defined as the beginning of fuel None. None.reduction until the total shutdown of fuel to the boiler.The duration of the exemption from emission limitsspecified in this permit shall not exceed 30 consecutive

U 37 OS1 14 minutes. In Compliane Stutio Records NoPlease note that the above exemption does not apply

o the RACT emission limits described in N.J A.C.7:27. [N.J.A C. 7:27-22.16(e)]

.0180 0

I .... Creek and Sat re tC. trilnrt; Sltaiionr,

Compliance Status Method to Is a ComeplianreRefi Applicable Requfrement Monitoring Requirement Recordlkeeplng Requirement fIn Compliance Determine Sehtedule Commentse e Non-Cumtiannet Cnmpice Attached? tven/Nno

No visible emissions exclusive of visible condensed Other: Visual Determination. Weekly when burning low Other: Manual logging of observations in anater vapor, except for a period of not longer than sulfur disillate oil. The permittee shall condctc visual permaneeoly bound logbook or readily accessiblethree minures in any consecutive 30-minute period opacity inspections durng daylight hours. Visual computer mennry. Weekly when burning low sulfurN.J.A.C.7:27-3 2(a)] & N.J A.C. 7:27- 3.2(c)) inspections shall consist of a visual survey to identify if distillate oil. The perrmittee must retain the followingthe stack has visible emissions, (other than condensed records; (1) Date and time of inspection; (2) Emnissionwater vapor): greater than the prescribed standard. If Point number: (3) Operational status of equipment;visible emissions are observed, the permnittee shall do (4) Observed results and conclusions: (5) DescriptionOhe following: (t) Verify that the equipment and /or of corrective action taken if needed; (6) Date and timecontrol device causing the emission is operating opacity problem was solved, if applicable: (7) N.J.AC.according to manufacturers specirfeations and fne 7:27B-2 results it condurcted, and (6) Name ofoperating permit compliance plan. If the equipment or person(s) conducting inspection.[N.J.A.C. 7:27-control device is not operating properly, the permitee 22.16(0)].U37 0d2 1 shall take corrective action immediately to eliminate In Compliance Station R.ecords NoOre excess emissions. The permittee must report anypermit violation to NJDEP pursuant to NJ.A.C. 7:27-22.19. (2) If the corrective aceon taken in step onedoes not correct the opacity problem within 24 hours.the permuttee shall perform a check via a certifiedaccordance vith N J AC. 7:271-2, Such a test shtatbe conducted once per day until corrective action istaken to suiccessfully correct the opacity problem. Tiepermittee must report any cntiruiniog Permit violationto NJDEP pursuant to N.J.A.C. 7:27-22 19.[N.J.A.C.7.27-22.16(o)I.

._,Particulate Emissions <= 10,6 Wbtlr. Particulate None. None.emission limil (rein lie combustion ot fuel based onU 37 OS2 2 rated heat input of source. IN.J.A.C. 7:27- 4.2a)]

In Compliance Station Recorrs Nu

Sultur Content in Fuel: n 0.3 percent by weight Sulfur Content in Fuel: Monitored by review of fuel Sulur Contcnt in Poet. RecordnIeoping by fuelMaximum allowable sulfur content in fuel oil by fuel oil delivery records per delivery. (N.J.A.C 7 27-22.16(e)] certification receipts once per bulk fuel sthipment. KeepU 37 OS2 typelviscosity arrd geographical zone. (N J.A C. 7:27- records of invoiceslbitls of lading showing fuel Sulur In Compliance Stalion Rper--s No0.2(a)] content. Per delivery. [N.J.A.C. 7:27-22.16(e)]

Adjust the combustion process in accorda•ce wirl Other Adjust combustion process by boiler tune-op. Recordkeeping ny manual loggirg of perarreterN.J A.C 7.27-19.16 each calendar year. Recsrd NOx Annuully,[N.J.A.C. 7:27-t6 8(c)), annually in a permanently bound logbook or readilyand CO conc. after eachr adjustment and the 02 conec accessible computer memory containing the foliowingat which NOv and CO were measured. IN.J.A.C. 7:27- information for each adjustnent:16 8(c)) 1. The date of the adjustment and tie times at which it

began and ended:2. The name, title and affiliation of the person whomade tfie adjustment;3. The NOx conrentration in the effluent stream. ineither ppnmv or ppnrvd. after each adjustment wasU 37 OS2 4 made. In Compliance Station Records Not. Tire CO concentration in the effluent stream in eitherppmv or ppmvd. after eacr adjustment was made:5. The concentration of 02 at which the CO and NOnconcentrations pursuant to the steps 3 and 4 weremeasured: and&. Any other information which thre Depatdment or EPAhas required as a condition of approval of any permitor cortifrPni issued for tie equipment or sourceoperation. [N.J A.C 7:27-16,8(c)]

VOC (Total) -0 g1i Ibnbr. Maximum emission limit None. None.U 37 OS2 b based ott pyeconstruction permit. [N J.A.C 7:27- In Compliance Station Records No

N O (Total) g 6.6 lb/hr. Maximum emission limit None. NoneU 37 OS2 6 based on precunstruction permit. [N J.A.C. 7:27- Itr Compliance Station Records No

CO <b 1,5 1b10v Maximum emission rate bWsed on None. NoneU37 uS2 7 operating permit application. [N.J A C 7:27-22.16(a)( In Compliance Station Records No

0 3 37 lb/tbr. Maximum emissionr ireil based onr None. NoneU 37 OS2 0

.rcnt•to emt[....72-21(t

In Compliance Station Records Nio____ ecrrroin lerit [N J A.C. 7:27-22. Ole))TSP -= 0,6 Ib/thr. Maxirlrur emrission tinrit based on None None.U 37 OS2 p Prec6nstruction perrit, [N.J A C. 7:27-22.16(e) I

In Compliance Station Records tNPM-10 (Total) 4= 0.66 fbihr. Maxirrum emission limit INme. None.U 37 002 tO based on precoistruction permit. NJ.A.C. 7:27

In Cnliance. Station Records No

U 37 052 Boiler biel limited to low sulfur distillate oil. (N.J .A.C JNo ne. None.U3 _S 1

7:27-22.16(e)] In Compliance Station Recold_ No

Page 2b ef D0

Se-tion 6- Conomplnte Sta1rs

l ,,e Creek arnd Satneu Generating Stations

Compliance Statrs Method to Is a ComplianceR IRef 6 Applicable Requirement Monitoring Requirement Recordkeeplng Requirement (in Compilance Determine Schedut e CommentsN-ornX;plianctc) compliance Alttached? iYerdNol

U 37 OS? 12 tMaximum Gross Heat Input nn 462 MMBTUIhr (HHV). Other: Fuel burner rated capacity,[N.J.A.C, 7:27- None, In Corpliarce Station Recards NoUN.J.A.C. 7:27-22.16(e)] 22.16(e)].Start-up shall be defined as the period from beginning None. None.of ftrl ignition until the flame of the burner reachesstabilization. The duration of tIre exemption from theemissions limits specified in this permit shall notexceed 30 consecutive minutes.

U 37 OS? 13 Please note that the above exemption does not apply In Cnnphanne Statin Records Noto the RACT emission limits described in N.J.A.C.

7:27, [N.J.A.C. 7:27-22.16(e)]

Shutdown shtll be defined as the beginning of fuel None. None.reduction urtil the total shutdown of fuel to the boiler.The duration of the exemption from emission limits

U 37 OS2 14 specified in this permit shall not exceed 30 conseutive In Compliance Station Records Nominutes.

Please note that the above exemption does not applyto the RACT emission lioits described in N.J.A.C.7:27. [N.J.A,C. 7:27-22.16te)lOpacity -= 20 %. Smoke emissions from stationary Opacity: Monitored by visual determination at the Other: Manual logging of Visual Observations in aturbine engines no greater than 20% opacily, exclusive approved frequoncy, based on an instantaneous perianenty bound logbook or readily accessibleof visible condensed water vapor, for a period of more determination. Periodic Visual observations. Once compuler memory. Oce evry 100 hours of oil firingthan 10 consecutive seconds, [N.J.AC. 7:27- 3.5) every 100 hours. Visual observations shall be operation.

conducted by certified smoke reader every 100 hours Recordkeeping may occur at a lesser frequency ifof oil firng using NJ Test Method 2. Circumstances prohibit conducting a visualMonitoring and recordkeeping may occur at a lesser determination (e.g., nighttime operation. weatherfrequency if circumstances prohibit conducting a visual conditiions. unplanned dispatching, etc,) withiitie tWOdetermination (e~g., nighttime operation, weather hour timehrane. However, in no case shall the intervalU 39 000 1 conditions, unplanned dispatching. etc.) within the 10O between visual determinations recording exceed 125 In Compliance Station Records Nnhour timeftrame. However. in no case shall the interval hours of operation. lithe visual obsernation occurs at abetween visual determuiations exceed 125 hours of lesser frequency than every 100 hours of operation,operation. If the visual observation occurs at a lesser tre reason for monitoring at the lesser frequency shallfrequency than every 100 hours of operation, the also be recorded [N.J.A.C. 7:27-22.16(o)].reason for monitoring at the lesser frequency shall alsobe recorded. [N.J A.C. 7:27-22.16(o)]

Particulate Emissions <= 40d5 Ibih. Particulate None. None.U 39 OSO 2 emission fimit frm the combustion of fuel based on In Compliance Station Records Norated heat input of source. [N.J.A.C. 7:27- 4.2(a)]

Sulfur Content in Fuel -= 0.3 % sulfur by weight. Sulfur Content in Fuel: Monitored by review of fuel Sulfur Content in Fuel: Recordkeepiag by manualU 30 OSO 3 Maximum allowable sulfur content in fuel oil by fuel oil delivery records per delivery. [N.J.A.C. 7:27-22.16(o)t logging of parameter per delivery in a permanently In Compliance Stabie Records Notype/viscosity and geographical zone. [N.J.A.C. 7:27- bound logbook or readily accessible omputer9.2(b)] memory. [N.J.A.C. 7:27-22.16(o)]

CO <n 250 ppmvd @ 15% 02. [N.J.A.C. 7:27-16.9(b)) CO: Monitored by stack emission testing at the GO: Recordkeeping by stack test results at theapproved frequency. approved frequency.U 39 OSO 4 See U39. OS Summary Reference numbers 26 See U39, OS Summary Reference numbers 26 In Compliance Stack Testing Nothrough 33 for stack tests details and monitoring through 33 for remordkeeping requirements. [N.J.A.C. Report.requirements. [N.J.A.C. 7:27-22.16(o)] 7:27-22.16(o)]

VOC (Total) -= 50 ppmvd @ 15% 02, [N.J.A.C. 7:27- VOC (Total): Monitared by stack emission testing at VOC (Total): Reordkeeping by stack test results at the16.9(c)] the approved frequency. approved frequency. Stack TestingU 39 OSO 5 See U39, OS Summary Reference numbers 26 See U39, 0S Summary Reference numbers 26 In Compliance Rept Nothrough 33 for stack tests details and monitoring through 33 for recodikeeping requirements. [N.J.A.C Reportrequirements. [N.J.A.C. 7:27-22.16(o)] 7:27-22.16(o)]

Once per calendar year, evaluate and calibrate turbine. None. Other: Gas generatmr lug, PJM test data sheet, andif necessary, to verify that it is being operated within gas turbhie engine hour report. Annually [N.J AC. 7:27-the manufacturer's operational lintits. In addition, 22 16(o)).ensure that inspections and maintenance are beingperformed in support of running the turbine with these

U 39 00o 6 operating limits, In Compliance Station Records NoIn addition, ensure that inspections and mtairtenance

are being performed in supped of running the turbinewith these operating limits, (N.J.A.C. 7:27-16 9(f)]

Once per calendar year. calibrate turbine temperature None. Other: Gas generaltr log, PJM test data sheet, and7 control system which governs the firing of the gas turbine engine hour report, Annually [N.J.A C. 7:27. In Compliance Station Records Nocombustion turbine. IN.J A C. 7:27-16.9(f)) 2216(o)].

0 0ct 0 0

Svto~ tiC

I "Pot Chruk arid SriI Ccc,, .nlill u tlirn

Corplianco Status Method to Is.a CornpliollneRef # Applicable 1Rdequireent rinitoiring Requirement Reeordkeeplng Requirement (In Complianice Detntin~ie SOhedat Com~ment=s

Non-ComplIannt) Compliince Attached? (Yesleo)

During manufacturer's recommended combustion None tther: Gas generator log. PJM test data sheet, andinspections and planned shutdowns, inspect and clean gas turbine engine hour report Every 1,500 operating

U 39 OSO 8 fuel nozzle burneruassemblies and replace or repair hours and during planned shutdowns.(N.J.A.C. 7:27- In Compliance Station Records Itoany defective components, IN.J.A C. 7:27-16,9(f)) 22,16(o)).

Duoing manufacturer*s recommended combustion None Other: Gas generator log, PJM test data sheet, andinspections and planned shutdowns, inspect the gas turbine engine hour report. Every 1,5tO operating

U 39 OSO g combustion burners and repair as necessary to hours and during planned shutdowns.tN.J.A.C. 7:27- In Complirnce Station Records No

eainbion mecthanical integrity. [N.J.A.C. 7:27-16t9It)1 22.16(a)],

PSEG must comply with tIhe requiremerts of its NOx Other: PSEG must comply with the requirements of its Otter: PSEG must comply witt the requirements of itsU 39 OSO 10 Averaging Plan as approved and modified by the NOx Averaging Ptan as approved anrd modifed bty tra NOs Averaging Plua as approved and modified by tre In Compliance Station Records Nto

Department (N JAC. 7:27-19.61 Department.IN.J.A.C. 7:27-1M6] Departrment.[N.J.A.C. 7:27-19.6__NOn (Total) <= 1 IblMMBt U. Limit on NOx emission NOx (Total): Monitored by stack emission testing at the NOx (Total): Recordkeeping by stack test results at therate based on NOx Emissions Averaging Plan. approved frequevcy, approved frequency.

U 39 1 N JA C. 7:27-19 6] See U39, OS Summary Reference numbers 27 See U39, OS Summary Reference numbers 27 In Compliance Stack Testing Nothrough 34 for stack tests details and monitoring through 34 for recordkeeping requirements (NJA C. Report

requirements. [N J A C. 7 27-22.16(0m1 7:27-22. t6(o)l

NOx (Total): Ttre Ownrer or Operator shall submit Noone. None,quarterly reports to the Sortherm Regional enforcementOfficer pursuant to N.J.A.C. 7:27-19.6lt).PSEG must comply with the requiremenls of its NOx

U 39 OSO 12 Averaging Plan as approved armd modified by thm In Compliance Station Records No

Departmenl. [N.J.A.C. 7:27,19.6(h)]

Combustion turbine fuel limited to low sulfur distillate Monitored by review of fuel delivery records per Other. Keep records of invoiceslbills of lading showingU 39 OSS 13 oil IN.J.A.C. 7:27-22 16(a)] delivery. [NIJA.C 7:27-22,16(a)) m naterias delivered. Per Delivery ,IN JAC. 7:27- In Compliance Station Recorrds No

I 22,16(a)).VOC (Total) -= 1306 monslyr. Manimum anrual None. None.

U 39 OSO 14 emission rate from operating permit application. In Compliance -Station Records NoN.J.A.C. 7:27-22.16(a)]

NOx (Total) = 192.39 tonstyr. Maximum annual None. None.U 39 OSO 15 emission rate from operating permit applicatione In Compliance Station Records No

[N.J.A.C. 7.27-22.16(a))CO - 113.53 tonstyr. Maximum annual emission rate Nobre. None.

U 39 OSO 16 trou operating permit application, [N.J.A.C. 7:27- In Compliance Station Records No22. 15 (ati

902 c- 57.71 tonstyr. Maximum annual emission rate None. None.U 39 OSO 17 from operating permit application. (N.JA C. 7:27- In Compliance Station Records No

22.16(ta)1 SP -= 19.24 tons/yr. Maximum annual emission rate None None.

039 0S13 16 trm operating permit application IN J.A.C. 7:27- In Cumplianc. Station Records No22.16(a))PM-tO (Total) = 48 tonslyr. Maximrmrnannual None. None.

U 39 OSw 19 emission rate from operating permit application. In Compliance Station Records NoN .J.A.C. 7:27-22.16(af]

Arsenic corepeunds = 0.003 tonstyr. Maximum None. None.U 39 OSO 20 annual emission rate from operating permit application. In Co-iance Station Records No

1_N.J.A.C. 7:27-22.t6(a)t

Polycyclic organic nmtter -= 0.004 tonslyr. Maoimum None. Noone.U 39 OSO 21 annual emission rate from operating permit application. In Compliance Station Records No

[N.J.A.C 7:27-22.a _(a)l

Lead compounds no 0,003 tonslyr. Manimum annual None. None.U 39 OS0 22 emission rate frnom operating perrit application, In Compliance Station Records No

- N.J.A.C. 7:27-22.15(a11______________________ _________

Manganese cormpounds v 0.2 fonsryr. Annual None, None.U 39 OSO 23 emission limit based on maximum annual fuel use In Compliance Station Records No

N JAC. 7:27-22.16IaS]

Polynuclnar aromatic hydlocarkons (PAl's) <=09

None. None,U 39 S00 24 tons/yr, Annual emission Jierit Sased on manim mn In Compliance Station Records No

annual fuel use. (N JA.C. 7:27-22. T(_)]

Peos 30 . t80

Shotiro 6 - C-uprl laoe StatusPSEG Ntk'ar 11C

I fope Criek and Salie Ceneriraig Stations

0 0 0 r' PCompliance Status Method to Is a Compliance

(in Compliance I Dtermine ScediuleNon.Corpltance) Complianeu Attachod? lY-flNol

Applicable Requirement Monitoring Requirement Recordkeeping Requirement Comnments

__________________________________________________

b~idrJi-rr Gross Heat Input: Maximum Annual Gross't Input (combined for both turbines) shall be lessn or equal to 3.85E11 BTU per any period of 365secutive days. based on 405 MMBtulhr per turbine950 hour of operation per year (combined for both

ines). IN.J.A.C. 7:27-22.16(a))

Other. Monitored ny electrical output meter.Continuousy.N.J.A C 7:27-22.16(a)]

Mlaximum Grass Heat Ilput: Recordkeeping by manualogging of parameter once per calendar day duringoperation Manually or electronically log the gross heatinput in MMBtu and fuel use in gallons for any periodof 365 consecutive days in a log book or electronically(computer, GAS or electronic operating system) eachday.The Annual Gross Heat Input in MMBtu for any periodof 365 consecutive days is computed by adding thegross heat input on a given day to the gross heat inputfor the preceding 364 days. The gross heat input for agiven day shall be a total of 24 readings taken onceper hour.Hourly actual heat inyput (MMBIu) shall be calculated asfollows: (x MW-hr) x 15.65 MMBtu/MW-hr. where "'" isthe actual hourly electrical output (total from twolurbines) and 15.65 is the heat rate based on the valuelisted in NOx emissions averaging plan Icase by-caseneeded).

Calculate the hourly actual fnel use. The gallons forariy period of 365 consecutive days is computed byadding the gallons on a given day to the gallonsconsumed during the preceding 364 days

This procedure will begin the first day following thehrrl issuance of the Operating Permit. This accountirgwill not inclrde MM~tu calculations or fuel used duringthe 365 days prior to the approval of the OperatingPerrit INRA AC. 7:27-22.,1WaWI

I

In Compliance Station Records No

The conditions if this Operating Scenario are only Otherx The peroiftee shall monfor and record the Other: Recordkeeping by manual logging of parameterapplicable to "Peaking Units" as defined by the tme capacity factor of each of the "peaking generating unit" or storing data in a computer system, each calendarAcid Rain program of USEPA. under 40 CFR 75 annually, to ensure that they quality for the "peaking year.[N.J.A.C. T27-22.16(otf.PSEG operates Pratt & Whiiney FT4 ("FT4") unit' status as defined by 40CFR 75.[N.J.A.C. 7:27-"Peaking Generating Unds" at is 9 generating stations 22.16(o)].throughout New Jersey. A peaking generating unit is acombination of one or more simple-cycle combustionturbine engines (coupled to one or more electric

In Compliance Station Records Nogenerators), designed to provide power primarilyduring "peak demand periods" (like the extreme heat ofsummer or severe cold of minter).PSEG utilizes three basic types of Peaking GeneratingUnits. (N.J.A.C. 7:27-22.16(a)]

. 0150

I T,,pc C-1, -d G.,-;Citing St"fi"n,

Ref Applicable Requirement Monitoring Requirement Reeordkeeplng Requirement (INc

the FT4 Peakuirr Generating Units are further None. Nonecategorized according to capacity factor, which is theratio of "actual" operating hours to tthe "otuat" operatinghours in a calendar year.An "Extremely Low Capacity Unt' typically operatesless than 200 hours per year.A "Low Capacity Unit" typically operates greater 200hours per year.Extremely Low Capacity Units

- Bergen Unit 3 Tf engine)- Burlington Unit 8 (1 engine)- Kearny Unit 9 (1 engine)- Kearny Units 10 artd 11 (16 engines)- Mercer Unit 3 (8 engines)- National Park Unit I (I engine)

U 39 00 27 Salem Unit 3 (2 engines)- Sewaren Unit 6 (8 engines)

Low Capacity Unsi

+ Essex Units .0: 11, and 12 (24 engines)- Edison Units 1, 2, and 3(24 engines)- Burlington Units g and 11 (16 engines)

The Low Capacity Uniss are further categorized intoengine sub categories according to hours of operationas follows,:

n600 hours- 5500 hours <i1000 hours- u t000 hours IN.J.A.C. 7:27-22.16(a))

Biennial emission testing for Exremely Low Capacity Monitored by periodic emission monitoring once Recoldkeeping by matrual logging of parameter orUinits using periodic emission monitoring devices: initiafiy arid every 2 years (twice per permit term) on at storing data in a computer data system once initiallyEmission testing shalt be performed every two years least 90% of the Extremely Low Capacity Units, and every 2 years (twice per permit term) IN.J.A C.on at least 90% of the Extremely Low Capacity units [N.JAC. 7:27-22.16(o)] 7:27-22. 16o))using periodic emission monitoring devices to measurethe concentrations of NOx, CO and 02. The testingshall be done in accordance with a pnotocol approvedby Chief BTS.The tests shall be conducted either during one of thetwo annually required Penosylvania-New Jersey.Maryland Intercosnnection (PJM)" Net CapabilityVeification Tests", or on unit availability. as long as atleast 90% of the Extremely Low Capacity Units aretested within the two year period.Extremely Low Capacity Units

U 39 OS 28 - Bergen Unit 3 (1 engine)- Burliigton Unit 0 (1 engine)- Kearny Unit 9 (1 engine)- Kearny Units 10 and 11 (t6 engines)- Mercer Unit 3 (8 gnginres)- National Park Unit 1 (1 engine)- Salem Unit 3 (2 engines)- Sewaren Unit 6 (S engines)

Ouas Fuel Engines:

For engines having the capability of using gas and/orail. emission testing will be required on the fuel fired atthe time of the test. [N.J.A.C. 7:27-22.16(a)J

No

No

Page 32 or g0

Sectiso 6 -Cnmrpliance SiatosPSEG Nuclear f..C

I hope Creek and S•hr orating Sitmi-,n

Compliance Status Method to r. a ComplianceRef Applicable Requirement Monitoring Requirement Recordkeephng Requirement (I. Compliance Determoin Schedule CommentsNo.-Csopliasnce) Compliance Attached? (YesfNo)

Hours of Operation -= 1,500 hours Flours of Operation: Monitored by hour/rime monitor lours of peerason Recordheeping by manuaf toggingWhen the hours of operation of any of the 38 each hour during operaton N.J.A.C. 7:27-22,16(a)] of parameter or storing data in a computer data systemExtremely Low Capacty units exceed 1500 hours, that each hour during operation. [N.J.A.C. 7:27-22.16(o)(errgine shall be removed from service for scheduledU 39 OS0 29 Hot Section Inspection maintenance. and shall be

In Compliance Station Records Noreplaced with another engine that is "EPA referenceMethod tested". [N JA.C. 7:27-22,16(a)/

Annual Full engine stack testng for Low Capacity Monitored by stack emission testing at the approved Recordkeeping by manual logging of parameter orUnits: frequency, based on the average of three 1-hour tests storing data in a computer data system uponStack testing shall be performed annually to measure JNJ.A.C. 7:27-22.i6(o)J occurrence of event. [N.J A.C. 7:27-22.16(oflthe concentrations of NOx, CO, VOC and TSP (whenburning fuel oil), using full reference method (RM)testing on a minimum of two (2) engines per station i~ea minimum of six of the Low Capacity units as follows:- two engines frorm Essex Units 10. 11. and 12 (24engines total) shall be tested;- two engines from Edison Units 1, 2, and 3 (24engines total) shall be tested:- two engines from Burlington Units 9and 11(16engines total) shall be tested.

Stack TestingU 39 00S 0

Is Compliance Repor NoThe testing shall be conducted in accordance with a

protocol approved by Chief BTS.Testing shall be performed on both fuels for each ofthe 2 engines tested every year.Each year two different engines than the ones tested inprevious year(s) sfrall be tested at each of the threestations, until all the engines have been tested. Thistest cycle shall be repeated. [NJ A.C. 7:27-22.16(a))

Annual emission testing for Uye following Low Capacity Monitored by hour/tirte monitor each hour during Recordkeeping by manual logging of parameter orUnits using periodic emissios monitoring devices: operation, based on one calendar year. INJA C. 7:27- storing data in a computer data system annually.- Essex Units 10, 11. and 12 (24 engines total). 22.16(o)] All records of test results of each engine shall be- Edison Units 1. 2, and 3 (24 engines total) and. mnaintained, for a period of ten years from the date of- Burlington Units 9 and It(16 engines total)/ record, and made available to USEPA or theEmission testing shal be performed annually on at Department upon requestf [NJ A C. 7:27-22.16(o)]least 90r% of the above Low Capacity units usingperiodic emission monitoring devices to measure theconcentrations of NOx, CG, and 02. The testing shallbe done in accordance with a protocol approved by

U 39 OSO 31 Chief BTS. In Compliance Station Records NoDual Fuel Engines:For engines having the capability of

using gas and/or oil, emission testing will be requiredon the fuel fired at the time of the test. [N.J.A.C. 7:27-22.16(a)j

. o0f

C s1limr 6 SIM-1ý1411.c

I I"r, Creel, nd ""Torn Slifinn,

Comrrpliance StaIr-' Method to I. a CorplianceRef # Applicable Requirement Monitoring Requirement Recordkeeptng Requirement (in Compliance Determine Schedule CommentsNo-Crompliiitc.) Compliance Attichetd? IYeri(No

-Fafure protocol: Other: Any engine ailing emission tests using periodic Recordkeeping by manual logging of parameter orAny engi.ne failing emission tests using periodic emission moattorng devices shaft be removed front storing data in a comnputer data system uponemission monitoring devices shall be removed from service, repaired or refurbished and re-tested with ocourreece of event IN.J.A.C. 7:27-22.16(o)]service, repairedandtestedagainwith periodic pereoic emission monitoring. Ifitfaila secondtime,emission rmonitoring devices. If [Ire engine fails a it shall be refurbished and tested With full referencesecond time. then it shall be refurbished and re-tested method (RM) testing [N.J.AC 7:27-22l16(o)].with full reference method (RM) stack testing. If it (ailsthe reference method test then it would be remnoved

U 39 OSO 32 fTom service and repaired and reference method tesled In Compliance Station Records Nofor ot pollutantsEngines that pass the reference method test can beput back into service.Permittee shoald make sure that the portablelhand-held stack testing device is working properly beforeusing it for testing. [NJ AC. 7:27-22.16(a)]

Conditional protocol Mronitored by periodic emission ntonitoring upon nacnrdkeeping by manual logging of parameter orIn the event phat any of the engines fail the emission occurrence of event, N J A.C. 7:27-22.16(o)] ftoring data in a computer data system upontest using periodic emission tonitoring devices, by occurrence of eventexceeding the permit limit a conditional protocol given The serial number of the engine failing the tests and ofbelow shall he followsed, rhe replacemerrt engines should be recorded, [N.J A.C.For low capacfty units. two(2) additional tests will be 7:27-22. t6(o)lperformed on two in-slot engines in the same sub-U 39 OS0 33

totegory(basedon the hoursofoperation) Ifsaid In Compliance Station Records No

ladditional engines in the same sub-category are notoperationally available, the two closest (in hours ofoperation) and available engine shalt be used fortested [N.J.A C. 7 27-22 16(a))

Conduct a comprehensive stack test at emission points Other: Other.PT4 according to the alternative emission testing Please see U39, OS Summary Reference Numbers Please see U39, OS Summary Reference Numbers 26program, developed and mutually agreed upon by the 926 through 33 for monitoring requirements thtrough 33 for recordkeeping requirements IN.J.A.C.

I permittee and the Department, given at U39, OS [N.J.A.C. 7:27-22,tS(o)[. 7:27-22.16(o)][ In Corptiance Stack Testing NoU 9 S1 Summlary Reference Numbers 26 through 33, of this Report

permit. to demonstrate compliance with the CO, NOxand VOC emission limits. IN.J.A C. 7:27-22.16(a)l

NOx (Total) <= 405 lb/hr. Maximotm ermission rate NOx (Total): Monitored by stack emission testing at the NOr (Total): Recoidkeeping by stack test results at thefrom operating permit application. [N.J.A.C. 7:27- approved frequency, approved frequency Stack Testing

U 39 OS1 22.16(a)] See U39. OS Summary Reference numbers 26 Please see U39, OS Summary Reference Numbers Copliarce RetNothrongh 33 for stack tests details and monitoring 26 through 33 for record keeping requirements Reportrequirements. INJ.A.C. 7:27-22.16(o)] [N.J.A.C. 7:27-22.16(o)]

CO c= 239 Ibrhr Maximum emission rate from CO: Monitored by stack emission testing at the CO: Recordkeeping by stack test results prior to perrdtoperating petmit application. [N.J.A.C, 7:27-22.96(a)) approved frequency - enewsal.SakTU 39 OS1 3 Please see U39. OS Summary Reference Numbers Please see U39, OS Summary Reference Numbers In Compliance Stack Testing No

26 through 33 for monitoring requirements. IN.J.AC. 26 through 33 for recorikeeping requirements. Report7:27-22.16(o)] [NJ.A.C. 7 27-22.16(9c)

VOC (Total) v- 275 WIbtT. Maximum emission rate VOC (Total) l•:onitored by stack emission testing at VOC (Total): Recordkeeping by stack lest results priorfrom operating permit applicationr. N J.A.C. 7:27- the approved frequency to permit renewal.

U 39 OSt 4 22 1t(a)] Please see U39. OS Fummary Reference Numbers Please see U39, OS Summary Reference Numbers In Compliance Stack Testing No26 through 33 for mc-ctoing requirements [N.J.A.C. 26 through 33 for recordhenr-ping requirements. Report7:27-22.16(o)] [N.J.A.C. 7:27-22.16()f .IS02 <= 12f.5 tb/hr. Manirmum emission rate hoer Nore. None. t opirc ttorRcrs NU 39 OSI 5 operating permit application. [N.J.A.C. 7:27-22.16(a)l In Compliance Station Records No

tSP <= 40.5 bhrr. Maximum emission rate from None. None.door__ npetating permit appication. [N.J.A C. 7:27-22.16(a)] In Compliance Station Records NoPM-10 (Total) v- 113 lb/hr. Maximum emission rate None. None.

U 39 OSt 7 frone operating permit application. )N.J.A.C. 7:27- In Compliance Station Records No_ 2.16[a)[

Maximurn Gross Heat Input -= 405 MMBrUrtr (HHV). Other: Manufacturer's fuet combustor rated None.039 OSt 8 9 Maximum heat input limit from operating permit capacity[N.J.A.C. 7:27-22,16(o)). In Compliancr Station Records NoSapplication [N.J.A.C. 7:27-22..16(a)]

I

Pasgs 7' of fO

Shnctirn 6 - Complianue StatesSEG Nduclear .,C

I hpe Creek and .. ,It , Generating Stations

Compliance Statlin Method to t. a ComplianceRef # Applicable Requirement Monitoring Requirement Recordkeeplng Requirement (In Compliance Deternflee Schedule CommentsNon-Compltance) Compliance Attached? (YeslN- )

Replacement of the combustion turbine can occur None. Recordkeeptng by manual logging of parameter uponprovided that such replacement does not constitute occurrence of event The forowing parameters shan be'construction', 'reconstruction', or 'modification' of a included in the Gas Generator nostallation Record and'significant source operation' as those terms are the Gas Turbine Engine Hour Report: date that thedefined in N.J AC 7:27-22.1. switch occurred; a description of the maintenance,[N J A C. 7:27-22.16(a)) repairs, and parts replaced on the malfunctioningU 39 OS1

turbine (since it was last in service); the make, model. In Compliance Station Records Noserial number. and location of the malfunctioningturbine and substitute turbine: and a demonstration orcertification showing that the switch did out result inincreased emissions of any pollutant or emission ofnew pollutants previously not emitted. [N.J.A.C. 7:27-22. t6(a)l

Conduct a comprehensive stack test at emission points Other: Please see U3g, OS Summary Reference Other;PT4 according to the alternative emission testing Numbers 26 through 33 for monitoring Please see U39, 0S Summary Reference Numbersprogram, developed and mutually agreed upon by the requirements [N.J.AC. 7:27-22.16(o)1 26 through 33 for recordkeepingpermitlee and the Departlment, given at requirements [N.J A C.

7:2

7-22.16(o)). Stack TestingU 36 S2 1 U39, 0S Summary Reference Numbers 27 through In Conptiance ' Report No34, of this permit, to demonstrate compliance with the

CO, NOx and VOC emission limits. [N.J.A C. 7:27-22.16(a)]

NOn (Total) o- 405 lblhr. Maximum emission fate NOx (Total): Monitored hy stack emission testing at the NOx (Total): Recordkeeping by stack test results priorfrom operating permit application. IN.J.A.C. 7:27- approved frequency. to permit renewal.U 39 OS2 2 22.16(a)] Please see U39. OS Summary Reference Numbers Please see U39, OS Summary Reference Numbers In Compliance Stack Testing No26 through 33 for stack tests details and monitoring 26 through 33 for recordkeeping requirements. Report

requirements. [N J.AC. 7:27-22.16(oa) [NJ.A.C. 7:27-22.16to)]CO -= 239 Ibthr. Maximum emission rate from CO: Monitored by stack emission testing at the CO: Recordkeeping by stack test results prior to permedoperating permit application [N.J.A.C. 7:27-22t16(a)] approved frequency. Please see U39, OS Summary renewal.

U 39 0S2 3 Reference Numbers 26 through 33 for stack tests Please see U39. 0S Summary Reference Numbers In Compliance Stack Testing Nodetails and monitoring requirements. [N.J.A.C. 7:27- 26 through 33 for recordkeeping requirements, Report22.16(o)] )N.J.A.C. 7:27-22.16(o)1

VOC (Total) -o 27.5 Itbhr. Maximum emission rate VOC (Total): Monitored by stack emission testing at VOC (Total): Recordkeeping by stack test results priorfrom operatihg permit application. [N.J.A.C. 7:27- the approved frequency. Please see U39: 0S to permit renewal.U 39 OS2 4 22.16(a)] Summary Reference Numbers 26 through 33 for stack Please see U3g, OS Summary Reference Numbers In Compliance Stack Testing Notests details and monitoring requirements. N.J.A.C, 26 through 33 for recordkeeping requirements Report7:27-22.16o)J N.J.A.C. 7:27-22.16(o)[

S02 <- 121,5 thhr. Maximum emission rate from None. None.U 36 0S2 ti operating permit application. [N.J.A.C. 7:27-22 16(a)] In Compliance Station Records No

TSP on 268 lb/hrr Maximum emission rate from TSP: Monitored by stack emission testirg prior to TSP: Recordikeeping by stack test results prior tooperating permit application. IN.J.A.C. 7:27-22,16(a)) permit renewal, based on each of three Department permit renewal. [N JA.C. 7:27-22.16(o)]validated stack test runs, Please see U39. OSSummary Reference Numbers 26 through 33 for stacktest details and monitorinrg requirements. [N.J.A.C.7:27-22,16(o))

U 39 aS2 6 In Compliance Stack Testing

Report NO

PM-1S (Toal) -o 113 1hlhr. Maximum emission rate None. None.U 39 OS2 7 from operating permit application. )N.J.A.C. 7:27- In Compliance Station Records No22.16(a)]

Maximum Gross Heat Input -= 405 MMSTU/hr (HHV). Other: Manufacturer's fuel combustor rated None.U 39 OS2 8 Maximum heat input limit from operating permit capaty[N.J.A.C. 7:27.22.16(o)! In Compliance Station Records Noapplication. N.J A.C. 7:27-22.161a)]

. ufS0 0

I tfrre Crrm:l nrd t r'm Gnrrlitr Statirns

Compltianc StoIcs Method to isa Compliante

Rat # Applicable Requirement Monitoring Requirement Recordl.eplng Requirement (In ; Co..ptamce Cortenine Schedule commentsNo-Compfianc.) Compliance Attacherd? (YisNofl.

Replacement of the combustion turbine can occur None. Recordkeeping by nanual togging ot paramener uponprovided that such replacement does not constitute occurrence of event The foflowing parameters shall beconstrrchotr, 'reconstruction', or 'modificahon' of a included ir the Gas Generator Installation Record andsg nirioant source operation' as those terms are the G:r3 Turbine Engine Hour Report: date that thedefined in N.J.A.C.7:27-22 1. [N.J A.C. 7:27-22.16(a)] switch crrcorted; a description of the raintenance.

repairs, and paots replaced on the malfunctioning

U 39 OS2 lbrhine (since it was last in service), the make, model. In Compfiance Station Records Noserial nomber, and tocaton of the meltunctioni•g

turbine and substitute turbine: and a demonstration orcenirrcation showing that the switch did not result inincreased emissions of any pollutant o0 emission ofnew pollutants previously not emitted (N.JA.C. 7:27-

22,16(a)]

VOC (Total) = 0.875 tonslyr. Annuol emission limit None. Nonebased on the aggregate total operating fere of 660

U 40 OSO t hoursocalendar year for all six generators as stipulated In Compliance StA'ioo Records Noin preconstruction permit. [N.J.A C. 7:27-22.16(e)]

NOn (Total) = 30.06 torns/yr. Arrrral emission limit None. None.bhsed on the aggregate total operating brime of 6b

U 40 OS 2 hours/calerrdar year for aol six generators as stipulated In Compliance Station Records Noin preconstruction permit. [N.J.A.C. 7:27-22.16(e)]

CO -= 7.86 fonesyr Annual ereission limit based on None. Noone.the aggregate total operating time of 660

U 40 OS00 hOUrsicalendar year for all six generators as stipulated In Compliance Station Records Noin preconstruction permit. [N.J.A.C. 7:27-22.16fe)]

S02 - 1.96 tonslyr. Annual emission limit based on None. None.the aggregate total opertoing time of 660

U 40 OSO 4 hoursfcalendar year for all six generators as stipulated In Compliance Station Records Noin precenstruction permit. [N J A.C, 7:27-22.16(e)]

rSP - 0,74--ons/yr. Annual emission limit based on None. None.the aggregate total operating time of 660

U 40 OS 0 hourslcalendar year for all six generators as stipulated lIr Conmpl,>'rce Station Records Non preconstructmon pelrit. (N J.AC. 7:27-2216 (en

PM-10 Totafl <= 074 tonslyr. Annual emission lirnrt None. None.hased on the aggregate total operating irme of 660

U 40 OSO 6 houhsfcalendar year for all six generators as stipulated In Compliance Staltion Records Non precoestruclion permit. [N.J.A.C. 7:2

7-22.16te)j

Polynfctear aromatic hydrocarbons (PAHfs) - 0.003 None. None.

U 40 OS0 7 toos/yr. Annual enrission limit based on operating In Compliance Station Records Nopermit application N.J A.C. 7:27-22.16(a)t

Propylane = 0 03 torrs/yr. Annual emission limit N ose. None.U 40 OSO 8 based on operating permit application. INJ.A C. 7:27- In Con.olince Station Records No

22.16(a)]

Total Hours of Operation -= 660 h/yr combined total Total Hours of Operation: Monitored by hourltinre Fotal Hours of Operation: Recordrkeping b/m rranurrlof all 6 generators Maximum annual operating horurs monitor continuously. hased on one calendar year. logging of parameter each month during operation.based on preconstruction permit. The total operating The permittee shall install, calibrate and maintain in The permibtee shall record in either a permanent boundtime of any generator in a calendar year shall not accordance with the manufacturer's specifications. a log book. or in readily accessible compfmnlr memories,

U 40 OS 9 exceedh5Doborur.(N.3.A.C 7:27-22.16(e)) totahiing hour meter to monitor the total hours of the monthly hours of operation of each generator and In Compliance Station Rn,-rds Nooperation per year for each generator. [N.J.A.C 7:27- made available to the representatives of the22,16(e)] Department of Environmental Protection upon request

for a period of five years after the date of each record.[N.J.A.C. 7:27-22.16(e)]

The Emergency Generators as defined in N.J.A.C. None. Recordtreepirrg by aranual loggirrg of peronmerer opOn

7:27-19 1 cannot be used for load shaving, peaking occurrence of event The prermitee shall record inrower production, or generation in an agreement with a either a permanent bound log book, or in readily

U 40 OSO 10 otifity energy assistance program. [N.J.A.C. 7:27- accessible noerputer memories, each occurrence of In Compliance Station Records No22.16(o)] stad-op. dale, duration of emergency generator

operation and reason and the name of the personmahing the entry. (N.JA.C. 7:27-22.16t0)]

Page 36 of 60

Selion 6 - Crrnrptiance StahicPSEG NEcfear LIC

I tpo Cr ck anrd Safo.1- Cnrrrihg Stations

Compliance Status Method to Is a ComplianceRef # Applicable Requirement Monitoring Requirement Reordkeeping Requirement (In Compliance cetermine Schedute CommtentsNon-omptianlc Compliance Attached? (YealNo)

Opacity 20 %, An emergency diesel generator that None None.is located at a facility that generates electricity fromnuclear power and that is subject to regulation by theNuclear Regulatory Commission is exempt Forom theprovisions of NJA.C. 7:27-3. However. thris exceptionfrom the applicability of this subcrhapter shag applyorgy as follows:I. Ouring a test mandated by the Nuclear RegulatoryCommission: orii, During a period when off-site supply of elecnricity isnot available due to causes outside the control of theownier or operator of the facility and operation of the -generator is needed for the protection of public healthor welfare.tf these exemption periods do not apply, no personshall cause, suffer, allow or permit smoke greater than20% opacity. exclusive of visible condensed waternapor, to be emitted into the outdoor air from thecombustion of fleo in this unit except for a period of notlonger than 10 consecutive seconds. {N.JA.C. 7 27-37(a)41

Particulate Emissions -= 8,94 b/hlr. Particulate None. None.U 40 OS1 2 ermission limit trom the combustion of fuel based on

In Compliance Station Records Norated heat input of source. tN.J.A.C. 7:27- 4.2(a))

Sulfur Content in Fuel -= 0.3 % sulfur by weight. Sulfur Content in Fuel: Moritomed by review of fuel Sulfur Content in Fuel: Recordkeeping by fuelMaxirmum atuatable suifur content is fuel oil by tuel delivery recorde per dehiuery. [N.JA.C. 7:27-22.1th(ef] certificatior receipts per delloery showing sailfr40 4 OS 1 3 type/viscosity and geographical zone (Salem County). content. [N.J.A.C. 7:27-22.16(e)l In Compliance Station Records No[NJA.C 7:27- 9,2(b)]

VOC (Total) -= 2.65 Ib/hr. Maximum emission rate None. Nrone.U 45 OS1 from preconstruction permit. [NJAC. 7:27-22.16(e)] In Comrpliance Station Records No

NOx fTotal) -= 91.14 Ibhr. Maximum emission limit None. None.U 40 OS1 5 based on preconstruction permit [N.J.A.C. 7:27- In Compliance Station Records No22.16(e)]

UCO -= 23,81 Ib/hr, Maximum emission rate from None. NoneU ,0 OS1 6 preconstruction permit. [NJ.A.C. 7:27-22.16(e)] tn Compliance Station Records No

S02 -= 594 flohr. Maximum emission limit based on None. None.U 40 OS1 7 the preconstruction permit. [N.JA C. 7:27-22.16(e)] In Compliance Statiorn Records No

TSP -= 2.24 tblhr. Maximum emission rate from None. None.U 40 OS1 8 preconstrfion permit [N,J.A.C. 7:27-22.16(e)] In Compliance Station Records No

PM-10 (Total) -= 2.24 lb/hr. Maximum emission rate None. None.U 40 OSt 9 hrom preconstruction permit. [N.JA.C. 7:27-72,16(e)) In Compliance Station Records No

Generator fuel limited to low sulfur distillate oil. Monitored by review of fuel defivery; records per Recordkeeping by manual logging of parameter perU 40 OS1 tf (NJ.A.C. 7:27-22.16(e)] delivery. Review bills of ladingfinvoices. [N.J.A.C. delivery in a permanently bound logbook or redily In Compliance Station Records No7:27-22.16(e)] accessible computer memory. IN.J.A.C. 7:27-22.16(e))Maximum Gross Heat Input -o 29.4 MMBTIJhr fHHVi. Other: Fuel burner rated capacty.[NJ.A C. 7:27- None

U 40 OS1 11 Maximurm gross heat input, based on the 22.16(e)]. In Compliance Slation Records , Nopreconstruction permit. [N,J.A.C. 7:27-22.16(e)]

Start-up shall be defined as the period from beginning None. None.of fuel ignition until the flame of the burner reachesslabilization, The duration of the exemption from theemissions limits specified in this permit shall not

U 40 OS1 12 exceed 30 consecutive minutes." In Compliance Station Records NoThe above exemption does not apply to the RACT

emission fimits described in N.J.A.C. 7:27.[N.J.A.C. 7:27-22.16(e)]

0 or ai

Ilroq|'v Crac roo ad Ortoor11 Ou•.nv]r~irro S••ta ljsT1!

1 .1Comopliance Status Methoud to In a ConmplianeoRef Applicable Requirement Monitoring Requirement Recordkleeplng Requirement p.r Compton. " h"'rno Srhedrntrle CommentsNoRo-ComIpllaflce l Compliance Attached7 (Yesttio

Shutdown shall be defined as the beginning of fuel None. None.reduction unfit the total shutdown of fuel to the boiler.fhe duration of the exemption from emission limitsspecifed in this permit shall not e:ceed 30 consecutive

U40 OS1 13 minutes. In Compliance Station Records Nothe above exemption does not apply to the RACTemission limits described in N.J.AC. 7:27,IN.JXAC. 7:27-22t16(e)]

Opacity = 20 %A An emergency diesel generator that None. None.is located at a faciliy trat generates electricity fromnuclear power and Orat is subject to regulation by theNuclear Regulatory Commission is exempt from treprovisions of N.J.AC. 7:27-3 However, this exceptionfrom tbe applicability of this subchapter shall applyonly as follows:

During a test mandated by the Nuclear RegulatoryCommission; orii During a period when off-site supply of electricity isnot available due to causes outside the control of tileowner or operator of the facility and operation of the

U 40 OS2 1 generator is needed for the protection of public health In Compliance Station Records Noor welfare.If these exemption periods do not apply, no personshall cause, suffer, allow or permit smoke greater than20% opacity. exctusive of visible condensed watervapor, to be emitted into the outdoor air from thecombustion of fuel in this unit except for a period of notlonger thar 10 consecutive seconds. [NI.J.A.C 7:27-3.7(ad)•

Parcotate Emissions = 8094 Ib/hr. Particutoe None. None.U 40 082 2 emission folmt from the combustion of fuel based on In Compliance Station Records Norated seat input of source. [NJ.A.C. 7:27- 4.2(a)j

Sultor Content in Fun v 0.3 % sulfur by weight. rulfur Content in Fuel Monitored by review of fuel Sulfur Conterrt in Fuel. Recordkeeping by fuelMaximum allowable sulfur content iou fuel oil by fuel delivery records per delivery. tNJ.A.C. 7:27-22. 16fl craeriticution receipts per delivery showing sulfur

UI 40 S2 3 typelviscosity and geographical zone (Salem County). content. [N.J.A.C. 7:27-22,16(e)) to Compliance Station Records HofN,J,A,C. 7:27- 9.2(b)]VOC (Total) v= 2.65 tblhr Maximum emission rate None NooneU 40 OS2 4 from preconsteuction permit. (N.J.A.C 7:27-22t1Sfe)] In Compliance Station Records NoNOx (Total)- 91,14 v lbhr Maximum emission tinmit None. Noone,

U 40 OS2 5 based on preconstructuon permit. [NJ A C. 7:27- I In Compliance Station Records No22.16(e)]

CO v= 23.81 Ibthr. Maxinrum emission rate frotm None. None.U 40 OS2 6 precorstfruction permit. [N.J.A.C. 7:27-22.16(e)) In Conr'Haice Station Records No0S2 v- 594 IS/lif. Maximum emissiorr limit based on None. None.U 40 OS2 7 the preconstruction permit [N.J.A.C 7,27-22.t6(e)l lr Corplianre Station Records No

TSP <= 2,24 lb/hr. Maximum emission rate bom None, None.U 0S2 8 cosructin Compliace Station Recotds No

PM-F0 (Total) -= 224 Ibltr. Maximum ernission rate Noner Nm.eU 40 002 tfrue precoustructron permit, [N.J.A.C. 7:27-22.16(e). Ir Compliance Station Records NoGenerator fuel limrited to sew sulfur distillate oil. Monitored by review of fuel delivery records per Recordkeepirg by manual logging of parareete per

U 40 OS2 10 [N.J.A.C. 7 27-22.16(e)] delivery. Review bills of ladinglinvoices. [NJ.A.C. delivory in a permanently bound logbock or redily I In Compliance Station Records No7:27-22,16f6e)] accessible computer memory. [NJ.A.C. 7:27-22.16(e))Maximum Gross Heat Input <- 29.4 MMBTU/hr flHHVI. Other: FPtel burner rated capacity [N.J.A.C. 7:27- None.

U 40 OS2 1 1 Maxionum gross heat bnput. based o" fle 22.16(e)). In Compliance Station Records Nopreconstruction pereit. (N.J.A.C. 7:27-22.16(e)n

Start-up shall be defined as thre period from beginring None. None.OF froet ignition until tIh hame of tfe burner reaciesstabilization. The duration of the exemption from theemissions limits specified or this permit shall not

U 40 0S2 12 exceed 30 censecutine minutes. lt Compliance Station Records NoThIe above exemption does not apply to the RACTemission limits described ilt N.J.A.C. 7:27,[N.J.A.C. 7.27-22F16(e)l

Page 38 of 0

Se-tion 6 - cn-rrtiaane sliatnFPtEG Nucliar 11C

I lope Crel+ a.,d Salm GOnrating Stafixnv

Compliance Statas Method to Is a ComplianceRef # " Applicable Requirement Monitoring Requirement Recordkeeptng Requirement (tn Compliance • Determine Schedule ComrmentlNeor-Compliance) Compliance Attached? (Yes/Nof

Shutdown shall be defined as the beginning of fuel None. None.reduction unftl the total shutdown of fuel to the boiler.

The duration of the exemption from emission limitsspecified in this permit shall not exceed 30 consecutive

U 40 OS2 13 minutes. In Compliance Station Records NoThe above exemption does not apply to the RACT

emission limits described in NJJA.C. 7:27.tN.J.A.C 7:27-22.16(e)]

Opacitly 20 %. An emergency diesel generator that None. None.is located at a facility that generates electricity fromnuclear power and that is Subject to regulation by theNuclear Regulatory Commission is exempt from theprovisions of NJ.A.C 7:27-3. However, this exceptionfrom the applicability of this subchapter shall applyonly as follows:

Oruing a test mandated by the Nuclear RegulatoryCommission: orii. During a period when off-site supply of electricity isnot available due to causes outside the control of theowner or operator of the facility and operation of the

U 40 OS3 1 generator is needed for the protection ofpublic health In Compliance Station Records Noor welfare.If these exemption periods do not apply, no personshall cause, suffer, allow or permit smoke greater than20% opacity. exclusive of visible condensed watervapor, to be emitted into the outdoor air from thecombustion of fuel in this unit except for a period of ootlonger than 10 consecutive seconds. (N.J.A.C. 7:27-3.7(a)41

Particulate Emissions <- 8.94 lb/hr. Parficulate None. None.U 40 OS3 2 emission limit from the combustion offuel based on

In Compliance Station Records Norated heat input of source. [N.J.A.C. 7:27- 4.2(a))Sulfur Content in Fuel n= 0.3 % sulfur by weight. Sulfur Content in Fuel: Monitored by review of fuel Sulfur Content in Fuel: Recordheeping by fuel3 Maximum allowable sulfur content in fuel oil by fuel delivery records per delivery. [N.J A C. 7:27-22.16(e)] certification receipts per delivery showing sulfurU 40 003 3 typelviscosity and geographical zone (Salem County). content. [NJ.A C. 7:27-22.18(e)1 In Compliance Station Records No[NJ.A.C. 7:27- 9.2(b)]

VOC (Total) -= 2.65 Ib/hr. Maximum emission rate None. None.U 40 OS3 4 from preconstrucfion permit. [N.J.A.C. 7:27-22.16(e)) In Compliance Station Records No

NOx (Total) = 91.14 tb/hr. Maximum emission limit None. None.U 40 0S3 5 based on preconstruction permit. [N.J.A.C. 7:27-

In Compliance Station Records No22.16(e)]

CO -= 23.81 lb/hr. Maximum emission rate from None. None.preconstruction permit. IN.J.A.C. 7:27-22.16(e)) _n Compliance StaionReordNS02 - 5094 lb/hr. Maximum emission limit based on None. None.U 40 OS3 7 the preconstruction permit, [N.J.A.C. 7:27-22.16(e)]

In Compliance Station Records NoTSP n= 2.24 Iblhr. Maximum emission rate from None. None.U 40 OS3 8 preconstruction permit. INlJ.A.C. 7v27-22.16(e)]

In Compliance Station Records NoPM-1 0 (Total) - 2.24 lb/hr. Maximum emission rate None. None.U 40 i 053 9 from preconstruction pemrit. [N.J.A.C. 7:27-22.16(e))

In Compliance Station Records NoGenerator fuel limited to low sulfur distillate oil. Monitored by review of fuel delivery records per Recordkeeping by manual logging of parameter perU 40 083 to (N.J A C. 7:27-22,16(e)] delivery. Review bills of ladinglinvoices, [N.J-A.C. delivery in a permaneitly bound logbook or redily In Compliance Station Records lNo7:27-22.16(e)] accessible computer memory, [N.J.A.C. 7:27-22.16(e)]Maximum Gross Heat Input - 29.4 MMBTUIhr (HHV). Other: Fuel burner rated capecity.[N.J.A.C. 7:27- None.

U 40 OS3 11 Maximum gross heat input, based on the 22.16(e)]. In Compliance Station Records Nopreconstruction permit. [N.J.AC. 7:27-22.16(e)]

Start-up shnll be defined as the period from beginning None. None.af fuel ignition until the flame of the burner reachesstabilization. The duration of the exemption from theemissions limits specified in this permit shall not

U 40 OS3 12 exceed 30 consecutive minutes. In Compliance Station Records NoThe above exemption does not apply to the RACT

emission limits described in N.J.A.C 7:27.(N.J.A.C. 7:27-22.16(e))

.f 010

Ihrpx Cr xik mnd salrt,(, en•xrtf•g• Stltirtor

Compliance Status Method to Isa ConrripliareRef # Applicable Requirement Monitoring Requirement Recorrkeeping Requirement (in Compliance Do t nterrinet Schredole Comments- Non-Comprliance) Compliance A. achd7 (YestNo_

Shutdown shall be defined as the beginning of fitr None. None.a creduction undl the total shutdown of fuel to the boiler.Tile duration of the exemption from emission limitsspecified in this permit shall not exceed 30 consecutive

U 40 OS3 13 Minutes. In Compliance Station Records NoThe above exemption does not apply to the RACT

emission limits described in N J AC. 7:27.[N J AC. 7.27-22 i1(e)]

Opacity = 20 %. An emergency diesel generator thW None. Noneis located at a facility that generates electricity fromnuclear power and that is sutbect to regulation by theNuclear Regulatory Commission is exempt from theprovisions of N.J.AC, 7:27-3, However. this exceptionfrom the applicability of this subirapter shall applyonly as follows'lDOring a test mandated by the Nuclear RegulatoryCommission: orii During a period when ott-site supply of electricity isnot available due to causes outside the control of theowner or operator of the facility and operation of the

U 40 OS4 generator is needed for the protection of public health In Compliance Station Records Noor weltare.If these exemption periods do not apply, no personshall cause, suffer, allow or permit smoke greater than20% opacity. exclusive of visible condensed watervapor, to be emitted into the outdoor air from thecombustion of fuel in this unit except for a period of notlonger than 10 consecutive seconds [N J.AC 7:27.3 7(a)4]

Patticolate Emissions n= 8.94 Ib/br. Particulate None. None.U d405OS4 2 emnission timil from the comlbustion olfoful based on Is Coorpliance Station Records Norated teat input of source. [NJ.A.C. 7:27- 4.2ta)]Sultur Contnt in Foel x= 0.3% sulfur by weigtt Suifur Content in Fuel: Monitored by review of fuel Sultor Content in Fuel: Recordkeepihg by tueIMaximum allowable sulfurcontent in fuel oil by fuel delivery records per delivery. [N.J.A.C 7:27-22.16(e)] certification receipts per delivery showing sulfurUd 0S4 typelviscosity and geographical zone (Salem County). content N J A.C. 7:27-22.16e(e)) In Compliance Station Records No[N JA.C. 7:27- 9 2(b))

VOC (Total) -= 2.65 b/hr, Maximum emission rate Norre. None.U 40 OS4 4 trom precons'ucion permit. [N.J A.C. 7:27-22.16(e)[ In Compliance Station Records No

NOx (Total) v O9f.14 Iblhr. Mavintum emission limit None. None.40 OS4 5 based on preconstruction permit. (N.J.AC. 7:27-

in Compliance Station Records No22.16(e)]GO -= 23.8 t illhr. Maximum emission rate from None. None

U 40 OS4 6 preconstruction permit. (N.J.A.C. 7:27-22.16(e)l In Compliance Station Records No

S02 ;= 5.d4 lothh Maximum emission limit based ox None. None.U 40 OS4 7 fle preconstruction permit. [N.J.A.C 7:27-22.16(e)[ In Compliance Station Records No

TSP -= 2.24 tblhr. Maximum emission rate from None. None,U 40 OS4 8 pre.orrstruction permit. [N.J.A.C. 7:27-22. t6(e)] In Compliance Station Records No

I0M-10 (Total) -= 2,24 lbdrr. Maximum emission rate Ndoe None.fm OS4 g Ipreostuction

permit. [N.J.A.C. 7:27-22.16(e)] In Compliance Slation Records NoGenerator fuel limited to low sulfur distillate oil. Monitored by review of fuel delivery records per Recorokeeping by manual logging of parameter per

* 40 OS4 10 [NJ.A.C. 7-27-22.t6(e)) delivery. Review bills of ladinglinvoices )NJ.A.C. delivery in a permanently bound logbook or redity In Coroplionce Station Recotds No7:27-22. t6(e)] accessible conrputer memiory. [N.J.A.C. 7:27-22.16(e)]

Maximum Gross Heat Input -= 29.4 MMB7U/hr (HHV). Other: Fuel burner ratlil capacity (IN JA.C. 7:27- None,* 40 OS4 1 Maximum gross heat input, based on the 22 16(e)). In Compliance Station Records Nopreconstruction permit. (N.J.A.C. 7:27-22.16(e)]

I I

Page 40 of 80

Section 6 -Comppliance StatusPGFkG Noclear I~lC

Iltope Creek -nd Stae Generating Sthtions

IComeplionce Statou Method to ts a ComrplianceRefi Applicable Requirement Monitoring Requirement Recordkeoping Requirement (In Coemptlanne j Detene Sherdtle CommentsNotr-Corpllane) Compliance Attached? (Yeslilo)

Start-up shall be defined as the period from beginning None. None.of fuel ignition until the flame of the burner reachesstabilization. The duration of the exemption from theemissions limits specified in this permit shall not

U 40 OS4 12 exceed 30 consecutive minutes. In Compliance Station Records NoThe above enemption does not apply to the RACT

emission limils described in N.J.A.C. 7:27[N.J AC. 7:27-22.16(e)l

Shutdown shall be defined as the beginning of fuel None. None.reduction until the total shutdown of fuel to the boiler.The duration of the exemption front emission limitsspecified in this permit sha00 not exceed 30 consepnutve

U 40 OS4 13 minutes. t Compliance Station Records NoThe above exemption does not apply to the PACT

emission limits described in N.J.A.C. 7:27.[N.J.A.C. 7:27-22.16lel[

Opacity = 20 %/. An emergency diesel generator that None. None.is located at a facility that generates electricity fromnuclear power and that is subject to regulation by theNuclear Regulatory Commission is exempt from theprovisions of N.J.A.C. 7:27-3. However. this exceptionfrom the applicability of this subohapter shall applyonly as follows:i. During a test mandated by the Nuclear RegulatoryCommission; orlo.During a period when ofl-site supply of electricity isnot available due to causes outside the control of thenowner or operator of the facility and operation of the

U 40 OS5 1 generator is needed for the protection of public health In Compliance Station Records Noor welfare

If these exemption periods do not apply, no personshall cause, suffer, allow or permit smoke greater than20% opacity. exclusive of visible condensed watervapor, to be emi~ed into the outdoor air from thecombostion of fuel in this unit except for a period of notlonger than 10 consecutive seconds. [N.J AC. 7:27-3.7(a)41

Particulate Emissions <= 8.94 b/hr. Particulate None. None.U 40 OS5 2 emission limit from the corobustion of fel based on

In Compliance Station Records Norated heat input or sourc. IN, .A.C. 7.2 '. 41.2ia}Sulfur Content in Fuel n= 0.3 % sulfur by weight. Sulfur Content in Fuel: Monitored by review of fuel Sulfur Content in Fuel: Recordkeepiag by fuelMaximum allowable srllur content in fuel oil by fuel delivery records per delivery. [N.J.A.C. 7:27-22.16(e)] certification receipts per delivery showing sulfurU40 OS5 3 type/viscosity and geographical zone (Salem County). content. [N.J.A.C. 7:27-22.16(e)] In Compliance Station Records No[N.J.A,C. 7:27- 9,2(b)]

VOC (Total) -= 2.65 Ib/hS. Maxrium errssion rate None. None.Ur40 OS5 4 from precontsrucbon permit [NJA.C. 7:27,22.16(e)[ In Compliance Station Records No

NOx (Total) -= 91.14 Ib/hr. Maximum emission limit None. None.U 40 OS5 5 based on preconstruction permit. [N J.A.C. 7:27- In Compliance Station Records No_ 22.615e)]

CO = 23,81 lb/hr. Maximum emission rate from None. None.U 40 OS5 6 preconstruction permit. [N.J.A.C. 7:27-22.16(e)[ In Compliance Station Records No

S02 -n 5.94 Ib/hr. Maximum emission limit based on None. None.U 40 OS5 7 he preconstruction permit. [N.J.A.C. 7:27-22.16(e[[ In Compliance Station Records NoTSP an 2.24 lblhr. Maximum emission rate from None. None.U 40 OS5 preconstruction permit. [N.J.A.C. 7:27-22.16(e)[ In Compliasce Station Records No

PM-tO (Total) o- 224 lhlrr. Maximum emission rale None. Nooe.U 40 OS5 f from preconstruction permit. [N.J.A.C. 7:27,22.16(e)1 In Compliance Station Records No

Irenerator fuel limited to om sulfur distillate oil. Monitored by review of fuel delivery records per Recordkeeping by manual loggig ot porameter perU 40 OS5 10 N.J.A.C. 7:27-22.16(e)[ delivery. Review bills ofladiogtievoices. [N.J.A.C. delivery in a permanently bourd logbook or redy In Compliance Station Records Np7:27,22.16(e)[ accessible computer memory. [N.J A.C. 7:27-22.16(e)]

.tS00

I t9peC.e: -d S.Am (.',nalintI statron'0

Complianrce Statss Method to Is a CoeplianceRef # Applicable Requirement Monitoring Requirement Reco1dkeepieg Requirement (iopnanc e Determine_ Schedule Comments

None-ospliaieo) Comnplhieu Attached? (Yes/No)

Maximum Gross Heat Input - 29.4 MMBTU/hr (f-TIV). Other: Fuel burner rated capacity IN.J.A C 7:27- one.U 40 OS5 11 Maximum gross heat input. based on the

22.16(e)] In Compliance Station Records Noprecostructinn permit. [N.J.A C. 7:27-22.16(e)l

Start-up shall be defined as tire period from beginning None. None.of fuel ignition until the ftame of the burner reachesstabilization. The duration of the exemption from treermissions limits specified in this permit shall iot

U 40 OS5 12 exceed 30 consecutive minutes. In Compliance Station Records NoThe above exemption does not apply to tre RACT

emission limits described in N,.,A,C. 7:27.[NJA.C. 7:27-22,16(e))

Shutdown shall be defined as the beginning of fuel None. None.reduction until the total shutdown Of fuel to the boiler,The duration of the exemption from emission limitsspecified in this permit shall not exceed 30 consecuive

U 40 OS5 13 minutes. In Compliance Station Records NoThe above exemption does not apply to the RACT

emission limits described in N J.A.C. 7:27.[N.J.A.C. 7:27-22.16(e)]

Opacity -= 20 % An enmergency diesel generator trat Nlone. None.is located at a facility that generates electricily frontnuclear power and that is subject to regulation by theNuclear Regulatory Commission is exempl from theprovisions of N.JA C. 7:27.3 However. this exceptionfrom the applicability of this subchapter shatl applyonly as follows:i. During a test mandated by the Nuclear RegulatoryCommission; orii During a period wher off-site supply of electricity isnot available due to causes outside the control of fieowner or operator of the facility and operation of the

U 40 OS6 t generater is needed for the protection of public health In Compllance Station Records Noor welfareIf these exemption periods do not apply, no personshall cause, suffer, allow or permit smoke greater than20% opacity. exclosive of visible condensed watervapor, to be emitted into the outdoor air from thecombuston of fuel in this unit except for a period of netlonger than t0 consecutive seconds. IN.J.A.C. 7:27-3.7ta)4t

Particulate Enissions - 8,94 Iblhr. Particulate None. None.U 40 OS6 2 emission limit frons the combustion of fuel based on In Compliance Station Records Norated heat input of source. [N.JA.C. 7:27- 4.2(a)]

Sulfur Content in Fuel -= 0.3 % sulfur by weight. Sulfur Content in Fuel: Monitored by review of fuel Sutlfur Content in Fuel: Recordkeepirrg by fuelMaximum allowable sulfur content in fuel oil by fuel . delivery records per delivery. IN J.A.C. 7:27-2216(ett certification receipts per delivery showing sulfurU 40 OS6 3 typehiuscosity and geograpricat zone (Salem Countyt. content. [N.J.A.C. 7:27-22.16(e)] In Compliance Station Records No

I [N.J.A.C. 7:27- 9,2(b)]U 49 056 VOC (Total) r= 2.65 bhbr. Maximum emission rate Norre. None. Is Complince Statin Records Nntfrom preconshuchon permit. IN.J.A.C. 7:27-22.t16(e))

NOx (Total) <= 91.14 lbbhr. Maximum emission limit None. 'None.U 40 OS 9 based on preconstr.cion permit. [NJ.A C. 7:27- In Compliance Station Records No22. 16o)]

CO n= 2381 libhs Manimurm erission rate from None S Nose.U 40 OS6 6 precons059on permit, N.J.A C9`7127-2216(e)] In Cumpliance Station Records NoS02 n 5.94 bbhr Maximum emission limit based on None. None.U 40 OS6 7 the preconstructinn permit. N.J.A C. 7:27-22.16(e)e In Compliance Station Records NoTSP -u 2 24 bfhib. Maximum emission rate from None. None.U 40 06 reconstruction peit. NJ A.C. 7:27-22.16(e) In Complianrce Stalion Records NoPM-10 (Total n= 2.24 Ibhr. Maximum ersission rate None. NoneU 40 OS6 truss preconstbucthon permit. IN JA.C. 7:27-22.16(e)] In Cnspliarrce Statios Records NoGenerator fuel limited to tur sulfur distillate oil. Monitored by review of fuel delivery records per Recordneeping by marral logging of parameter per

Ud 12S9 10 tN.J AC, 7:27-221 6(e)] deiery. Reiew bills of lading!inwoies. [N.J.A.C. delivery ir a permanently bound logbook or redily In Compliance Station Records No7:27-22. tfe) accessible computer memory. [N.J.A.C. 7:27-22.tett

Page 42 of 80

SIrtirrn 6 - CrimpIiance StatustItEG NI tar iLlC

I lope Creek and Saletn Generating Sttions

Comrpllanc Statui [ Method to Is a CompilanreRef # Applicable Requirement Monitoring Requirement Recordkxeeping Requirement (In Compliance Deterrine gnSchedule CommentsINIn-C mpiliance) Compliance Attachead? (Yeell~oý

Maximum Gross Heat Input -= 29.4 MMBTU/hr (HtV). Other: Fuel burner rated capacity.[N.J.A.C. 7:27- None.U 40 OS6 11 Maximum gross heat input, based on the 22.16(e)],

In Compliance Station Records Nopyeconstruction permit. [N J.AC. 7:27-22.1 6(e)]Start-up shall be defined as the period from beginning None. None.of fuel ignition until the game of the burner reachesstabilization. The duration of the exemption from theemissions limits specified in this permii shall not

U 40 0S6 f2 exceed 30 consecutive minutes. In Compliance Station Records NoThe above exemption does not apply to gie RACT

emission limits described in N.J.A.C. 7:27.[N.J AC. 7:27-22.16(e))

Shutdown shall be defned as the beginning of fuel None. None.reduction until the total shutdown of fuel to the boiler.The duration of the exemption from emission limitsspecified in this permit shall not exceed 30 consecutive

U 40 OS6 13 minutes. In Compliance Station Records NoThe above exemption does not apply to the RACT

emission limits described in N.J.A.C. 7:27.N.JA.C. 7:27-22.16(e))

NOx (Total) <= I tons/yr. Annual emission limit based None. None.Udt 0150 1 on maximum anenual fuel use. (N.J.AC. 7:27-22.16(e)) In Compliance Station Records No

CO - 0.23 tons/yr. Annuat emission limit based on None. None,U 41 U00 2 maximum annual fuel use. [N.J.A.C. 7:27-22.16(e)] In Conrpliance Station Records No

S02 s- 0.14 torns/yr. Annual emission limit based on None. None.U 41 U00 3 maximum annual fuel use. [N.J.A.C. 7:27-22.16(e)] In Compliance Station Records No

TSP <= 0.09 tons/yr. Annual enrission limit based on None. None.Udi 01S0 4 maximum annual fuel uset [N.J.AC. 7:27 22.16(e)) In Conpliaxce Stafion Records No

PM-10 (Total) -= 0.09 tonslyr. Aonual emission limit None. None.U 41 050 5 based on maximum annual fuel use. [N.J.A.C. 7:27- In Compliance Station Records No22.16(a)0

No person shall cause, suffer. allow or permit visible Other: Visual Determination. Monthly when burning # 2 Other: Manual logging of observations in asmoke to be emitted into the outdoor air from the fuel oil. The permittee shall conduct visual opacity penranenrty bound logbook or readily accessiblecombuslion of fuel in any stationary indirect heat inspections during daylight hours Visual inspectbons computer memory, Weekly when burning 0 2 fuel oilexchanger for a period of not longer than three minutes shall consist of a visual survey to identify if the stack The permittee must retain the following records: (1)in any consecutive 30-minute period. [NJ.A.C.7.27- has visible emissions, (other than condensed water Date and time of inspection; (2) Emission Point3.2(a)) & [N.JA.C. 7:27- 3.2(c)] vapor), greater than the prescribed standard If visible number; (3) Operational status of equipment: (4)emissions are observed, tire permiltee shall do the Observed results and conclusions; (5) Description offollowing: (1) Verify that the equipment and /or control corrective action taken it needed; (6) Date and timedevice causing the emission is operating according to opacity problem was solved, If applicable: (7) N.J.A.C.manufacturers specifications and the operating permit 7:278-2 results if conducted; and (0) Name ofcompliance plan. If the equipment or control de/ice is person(s) conducting inspection.INJ A.C. 7:27-not operating properly. the permiutee shaut take 22.16(o)].U 41 0S1 1 corrective action immediately to elimioate tie excess In Compliance Station Records Noemissions. The peimittee must report any permitviolation to NJDEP pursuant to N.J.A.C. 7:27- 22.19.(2) It the corrective action taken in step one does notcorrect the opacity problem obthin 24 hours, thepermittee shall perform a check via a certified opacityreader, in accordance with N.J.A.C. 7:278-2.Such a test shall be conducted once per day untilcorrective action is taken to successfully correct theopacity problem. The permilfee must report anycontinuing permit violation to NJDEP pursuant toN.J.A.C. 7:27-22.9.[N.J.A.C. 7:27-22.16(o)0.

Particulate Emissions x= 3.78 lb/hr. Particulate None, None,emission limit from the combustion of fuel based onU 41 OSI 2 rated heat input of source, JNJA.C. 7:27-4.2(a)] In Compliance Station Records No

Sulfur Content in Fuel -= 0 3 % sulfur by weight. Sulfur Content in Fuel: Monitored by review of fuel Sulfur Content in Fuel: Recordkeeping by fuelMaximum allowable sulfur content in fuel oil by fuel delivery records per delivery, [N.J AC 7:27-22 16(o)) certification receipts per delivery showing sulfurU 41 DOt 3 type/viscosity and geographical zone (Salem County). content, )N.J.A.C. 7:27-22.16(o)] In Compliance Station Records No(N JA.C, 7 27- 9,2(b)]

UNOx (Total) -= 1 Ibihr. Maximum emission limit from None. Nlone.41 DOS 4 Ipreconstruction permit. [N.J.A.C. 7:27-22.16(e)] In Compliance Station Records No

.of800 0

Section 6- u tti

.frye C nr k Iol Sha i-r C er ara tirrr; St atirro

Compliance Stati Method to Is a ComplianenRef # Appicable Requirement Monitoring Requirement Recordkeep-ng Requirement -I n Complance D et ermini e schedule CommentsNon.Compilance) Coinplirnic, Attached? (Yes/No)

CO t023 lb/hr. Maximum emission limit from None. NooeU 41 OS1 5 preconstruction permit. [N J.A.C 7:27-22 16(e)[ In Compliance Station Re cords NoS2 < 0,14 lb/int. Maximum emissio/ limit from None None.

4 preconstructio n perm it [N .JtA C . 7 27-22.16(e)[ th C oIrpi prr ne N oTSP <0 006 lb/hr. Maximum emission limit from None. NoneI

0 4 / 0 S1 7 p re corr s trr c tio n p e rm it. IN .J .A C . 7 2 7 -2 2 . t16 (oe ) t C o m p /l a n c S ta t io n Reo o rd s N oPM-t1O Totel) 0.09 bflirr Maximum emission rate None. None

U 41 OSt 8 from operating permit application, N.J AC. 7:27- In Compliarrce Station Records No2 2

.16/a)]

Boiler fhel Imnited to now sulfur distillate oil INJ A C None. None.041 OSt 9 7:27-22.16(e)] In Compliance Station Records No

Maximum Gross Heat Input = 6.3 MMBTUt/hf (ttIHV) Other: Fuel burner rated capacfty[N J AC 7:27- None.U 41 OS 10 M olanoor gmss beat nputL based on f he 22.16(e)]. It Compliance Station Records No3recorrtraction pernit [N.J.A C. 7:27-22.1t/et

Fuel Oil Usage - 90.000 gal/yr based on 2.000 Fuel Oil Usage: Monitored by fuel tow/firirrg rate Fuel Oil Usage: Recordkeeping by manual logginr ofhours/yr of operation. [N.J.A.C. 7:27-22.16(e)] instrument continuously . parameter an/rually in permanerrly bound log book or41 OS 1 1 This requirement does rot apply untit February 01, readily accessible computer memory,

2006. IN.J.A.C. 7:27-22. 16(o)) This mcuitenrent does lot apply until February 01, In Compliance Station Records No2006. )N.J.A.C. 7:27-22.16(o)n

VOC (Total) = 0 15 tons/yr. Arnnual emission limit Norre. NoneU 42 S06 based orr the preconstruction permit. [N.J.A.C 7:27- In Compliance Station Records No22.10(r))

NOx (Total) -= 1,778 tons/yr. Annual en/ission li/rit None. None.U 42 OSO 2 based on the preconstfuction permit. [N.J.A.C 7:27- In Compliance Station Records No22.16(e)]CO <= 0.61 torrstyr. Annoal em/so/on Iti/ni based on Nnrre.

None.U42 900 3 operating permit application. (N.J.A.C. 7:27-22.16(e)]

In Compliance Station Records NoS02 = 5.108 torns/yr. Annual emission limit based on None. None042 OS0 4 the pronnstroction permit, [N JA.Cý 7:27-22 16(o)) In Compliance Station Records NoTSP = 0115 tons/yr. Annual emission lirrt based on None None42 OSO 6 the preconstruction permit. [N JA.C. 7.27-22 16(e)] In Compliance Station Records NoPM-10 (Total) - OT 1t5 tons/yr. Annual em/ssion limit None. None.

U 42 OSS 6 based on the precorstruction permit. [N.J.A.C. 7:27- In Compliance Station Records No22 16(e))Total Iboum of Operation o= 500 hr/yr. The total Total Hours of Operation: Mriftrred by hou/tirne Total Hours of Operation: Recordkeep/hg by manualoperating ti/nm of the generator i/ a calendar year shall monitor cortinuously, based on one calendar year. logging of parameter each month during operation.not exceed 500 hours. [N.JWAC 7:27-22,16(a)) The permittee shall install. calibrate and maintain in Tire perminOe shall reco/ d in either a permanent boun/d

accordance wit b the manufacture r's specifications. a log book, or in readily accessible computer rnernrl/eS042 0S0 7 totalizing hour meter to monior the total hours of tre monthly hours of operation of the genera/or and In Compliance Station Records Nooperation per year for tire generator. [N.J.A.C 7:27- mrade available to the representatives ofthe

22.16(e)) Department of Environmental Protection upon requestfor a per/nd of Five years after the date of each r ecord.N.J.A.C. 7:27-22.16(e)]

The Emergency Generators as defined in NJ A.C. None. Recordkeeping by manusal logging of parameter upon727-19 1 cannot be used for load shairng. peaking occurrence of event. The permitoOe shall record inpower production, or generation iO an agreement with a eithter a permanent bound log book. or in readilyU 42 OS0 util/ity 0llergy assistance program )N.J.A C 7:27- accessible computer memories. each occurrence of In Coo/p/oance Station Records No22.16(o)] start-up. date, duration of emergency generator

operation nd reason and the name of the personmaking the ertry. [NJA C, 7:27-22.16(o))

Page 44 of 60

Section 6 -C ompliante hiatusPSEG Nurcfot 1tC

flopo Cr-,k dr SA....o Cecerrting Stations

Compliance Stui" Method to i. a ComplianceRef#I Applicable Requirement Monitoring Requirement Recordlkeeping Requirement (in Complluance Detennine Schedule Comments

Non,Comptia) e Compliance Attached? (YenlN)

Opacity <= 20 %, An emergency diesel generator that None. one,is located at a facilty that generates electricity fromnuclear power and that is subject to regulation by theNuclear Regulatory Commission is exempt from theprovisions of N,JA,C 7:27-3. However. this exceptionfrom te applicability of this subctyapter shall applyonly as follows:

O During a test mandated by the Nuclear RegulatoryCommission: orii. During a period when ofa-site supply of electricity isnot available due to causes outside the control of theowner or operator of the facility and operation of the

U 42 OS 1 generator is needed for the protection of public health In Compliance Station Records NOor welfare,

If these exemption periods do not applyr no personshall cause, suffer, allow or permit smoke greater than20% opacity. exclusive of visible condensed watervapor, to be emitted into the outdoor air from thecombustion of fuel in this unit except for a period of notlonger than 10 consecutive seconds [NJA C, 7:27-3.7(a)41

Particulate Emissions <- 0.99 lbthr. Partculate None. NoneU 42 OS1 2 emission limit from the combustion of fuel based on

In Compliance Station Records Norated heat input of source. [N.J.AC. 7:27- 4.2(a)]

-Sulfur Content in Fuel <- 0.3 % sulfur by weight. Sulfur Content in Fuel: Monitored by review of fuel Sulfur Content in Fuel: Recordkeeping by fuel4 Maximum allowable sulfur content in fuel oil by fuot delivery records per delivery. [N JAC. 7:27-22.16(e)) certification receipts per delivery showing sulfurU 42 OS1 3 typelviscosity and geographical zone (Salem County). content. (N.J.A.C. 7:27-22.t6(e)] to Compliance Stolion Records No[N.J.A.C 7:27- 9,2(b)]U 42 051 d VOC (Total) = 0,596 lb/hr. Maximum emission rate None. None.In compince Sttio Records Nofrom preconstruction permit. JN.JA.C. 7:27-22.16(e)]

In Compiance Stio__ReordNNOx (Total) -= 7.1 i lb/hr. Maximum emission limit None. NoneU 42 OSI 5 based on preconstruction permit. [N.J.A.C. 7:27-

In Compliance Station Records No22.16(e))

CO -v 3.21 lb/hr. Maximum emission rate from None. None.operating permit application. [N.J.A.C. 7:2

7-22.16(e)]

S02 n 0.43 lb/hr. Maximum emission limit based on None. None.U 42 OSi 7 the preconstruction permit. [N.J.A.C. 7:27-22,16(e)] It Compliance Station Records No

TSP -= 0.46 Ib/hr. Maximum emission rate hom None. None.U 42 OS1 8 lprecoastrtuctiarr permit. [N.J.A.C. 7:27-22.16(e)] Io Compliance Station Records No

PM-i 0 (Total) -= 0.46 Ibthr. Maximum emission rate None.. . None.U 42 OS1 9 from preconstbucthon permit. [N.J.A.C. 7:27-22.16(e)] to Compliance Station Records No

Uenerator fuel limited to low sulfur distillate oil. Monitored by review of fuel delivery records per Recordkeeping by manual logging of parameter perU 42 OS1 10 IN.J.A C 7:27-22.16(e)] delivery. Review bills of lading/invoices ]N.J.A.C. delivery in a permanently bound logbook or redily In Compliance Station Records No7:27-22.16(e)] accessible computer memory. [N.J.A.C. 7:27-22.16(e)]

Maximum Gross Heat Input v= 1.65 MMBTUIhr (HHV). Other: Fuel burner rated capacity,[NJ.A.C. 7:27- None.U 42 OS1 ftI Maximum gross heat input, based on the 22.16(e)]

In Compliance Station Records Nopreconstruction permit. (N.J.A.C. 7:27-22.16(e)]

0 .of 10

C Sciclin. 6 Stou-Nr.*.IIC

I fopi, Cn?,,Ik ,,,I Sirloin Gint-ting, Station,

Compliance Status Method to I. t ComptianceRef # Applicable Requirement Monitoring Requirement Recordkeeping Requirement (In Coplirance Determine Schedule ComrmentsNoee-Compliance) Compliane Attached? IYe/tio|

Opacity - 20 %. Visible emissions from diesel engine Opacity: Monitored by visual determination each Opacity, Rcordkeeping by manual logging ofno greater "hn 20% opacity, exclus ive of visible m~onth during operation, based on an iostantanev-,l pa~anotr' each m~onth during operation (in acondensed water vapor. except for a period of riot determination For compliance with the opacity permanently bound logbook or other electronic datalonger than 10 consecutive seconds standard, the permittee shall conduct visual opacity nanagemrent systemnI and retain the following recordsApplicable to OS 1 through OS19 [N JA C. 7:27, 3.51 inspections during daylight hours, Visual inspections ý 1) Date and time of inspection;

shall consist of a visual survey to identify if the stack (2) Emission point number:has visible emissions, exclusive of visible condensed (3) Operational status of the equipment;water vapor, to be greater than prescribed standard. If (4) Observed results and conclusions:visible emissions are observed, ttre permittee shall do (5) Description of corrective action taken it needed:tIre following: (6) Date and fnre opacity problem was solved, f(1) Verify that the equipment and/or control device applicable:causingtcontrolling the emission is operating according (7) N J AC, 7:27B-2 results if conducted; and

U 43 OS0o to manufacturer's specificationis and the operatirrg (8) Name of personls) conducting inspection. [N J AýC, lv Corpliance Station Records Nopermit compliance plan, If the equipment ot control 7:27-22,16(o)Idevice is not operating property, the pernittee shalltake corrcn•ýve action immediately to eliminate theexcess emissions The permittee must report anypermit violations to NJDEP pursuant to N.J A.C. 7.27-22.19(2) If the corrective action troon in step (1) does notcorrecl the opacity problem within 24 hours, theapplicant shall perform a check via a certified opacityreader. in accordance with NJA.C. 7:27B-2. Such testshall be conducted each day until corrective action istaken to successfully correct the opacity problem.[NJAC. 7:27-22,16(o))

Sulfur Content in Fuel u= 03 % sulfur by weight. Sutlftr Content in Fuel' Monitored by review offuel Sulfur Content in Fuel: Recordkeeping by fuelMaximum allowable sulfur content in fuel oil by fuel delivery records per delivery. N J.A.C 7:27-22 16(o) certification receipts per delivery sroawing sulfurU d3 OhO 2 type/viscosity and geographical zone (Salem County) content. INJ A C. 7:27-22 16(o)] In Compliance Stotion Recotds No[N JA.C. 7.27- 9,2(bk[CO -= 1.98 tons/yr. None. None.

U 43 OS0 3 Sum of emissions hrom OS1 through OS19g [NI JAC In Compliance Station Records No7:27-22.16(a)]

NOx (Total) <= 7.7 100/yr. None. None.U 43 OSO 4 Suer of emissions from OS through OS19. [N.J.A.C. In Compliance Station Records No7:27-22 16(a)(

PM-10 (Total) 0. h52 tons/yr. None. None.U43 OSO 5 Sum of emissions from OSI through OS 9 [IN JA C. In Compliance Station Records. No7:27-22.16(a)]

S02 - 0.15 tonsyr. None. NoneU 43 OSO 6 Sumn of emissions from OS1 throrugh OS 19 [N.J.A.C In Compliance Station Records No7:27-22.16(a)j

ISP -= S.52 Inns/yr. None None.U 43 otO Sum of emissions from OS1 through OS 19t [N.J.A C In Compliance Station Records No7:27-22.16(a)]

VOC (Total) = 0,65 tons/yr. None. None.U 43 OSt 8 Sum of emissions fhom OS1 through OS 19. [NJ.A C. In Compliance Station Records No7:27-22,16(a))

The engines shall have been manufactured prior to None . Recordkeeping by manual logging of parameter orApril 1. 2006, and shall not have been modified or storing data in a computer data system uponreconstructed as per 40 CFR 60 14 and 40 CFR ccurrence of event of certified copies of the date of60 15, after July 11, 2005 riaiurvtclure of each of tire engines. tbeApplicable to OS2 through OSrla. [oJA C. 7:27- manufacturer s specification of each of the engines22.S(a) wilth the serial number. the make, the model the

capacity, the emission limits of pollutants from theengines, the date when hrought on site and fire dateU 43 OSO 0 removed hron site, and the date of any modification or In Compliance Station Records Noreconstruction of the engines. Certification should be

as per NJ A C. 7:27-1339All records should be kept on site for a minimum of 5years from the date of record arrd made available tothe representatives of tIle Department and USEPAupon request [N.J A.C. 7:27-22.16(o))

U 43 OSIParticulate Emissions - 1,722 itbr. Particulatee.mission limit from the combustion of fuel based onrated heal einu at source IN J. A C 727- 4 2Wa11

None. None.

In Compliance I Station Records No

Page 46 of 90

Sertia. 6 -Complianea StatusPSFG Nrclear 111C

Htope Creek and Salo, Generating Stations

Compliance Status Method to [. a ComplianceApplicable Requiremnent Monitoring Requirement Recoidtkeeptrg Requirement (In Compliance Dte rite Schedulecom C entsNori-Corripliance) Compliance Attached? (Yes/No

Opacity - 10 % The equipment in this permit shallnot be used in a manner which will cause visibleemissions except for three minutes for a period of 30minutes during start-up which opacity shall not exceed10%. exclusive of condensed water vapor. Compliance,nith this provision shall be verified visually by the useof New Jersey Test Method 2 (N.JA,C, 7:27B-2).[N.J.A.C. 7:27-22.16(e)]

Dpacity: Monitored by visual determination eachmonth during operation, based on an instantaneousdetermination. For compliance with the opacitystandard, the permittee shall conduct visual opacityinspections during daylight hours. Visual inspectionsshall consist of a visual survey to identify if the stackhas visibte emissions, exclusive of visible condensedwater vapor, to be greater than prescribed standard Ifvisible emissions are observed, the permittee shall dothe following:(1) Verify dhat the equipment and/or control devicecausingtconbrolling the emission is operating accordingto manufacturer's specifications and the operatingpermit compliance plan, If the equipment or controldevice is not operating properly, the permittee shalltake corrective action immediatety to eliminate theexcess emissions. The permittee must report anypermit violations to NJDEP pursuant to NJ AC. 7:27-22,19.

(2) If the corrective action taken in step (1) does notcorrect the opacity problem within 24 hours. theapplicant shall perform a check via a certified opacityreader, in accordance with N.J.A.C. 7:278-2. Such testshall be conducted each day until corrective action Gtoken to successfully correct the opacity problem[NJA.C. 7:27-22.16(o)]

Opacity Hecnorokeeping by manual togging Orparameter each month during operation (in apermanently bound logbook or other electronic datamanagement system) and retain the following records:11) Date and time of inspection;2) Emission poie number.(3) Operational status of the equipment;14) Observed results and conclusions:(50 Description of corrective action taken if needed:t6) Date and tIre opacity problem was solved. rfapplicable:(7) NJ A C, 7:278-2 results if conducted; and(8) Name of pemson(s) conducting inspection [N.J.A.C7:27-22.16(o)] In Compliance Station Records No

-6-4......... . -l or 6 4 -8 +done.U43 OS1 3

VOC (Total) v- 0.74 lt/hr. Maximum emission ratefrom preconstruction permit. [N.J.A.C. 7:27-22.16(e))

None. qone.In Compliance Station Records No

NOx (Total) no 9.29 Ibthr Maximum emission limit . None. Nore.U 43 OS1 4 based on preconstractiori permit. [N.J.A.C, 7:27-

In Compliance Station Records No22.16(e)]

CO v- 2.02 thtthr. Maximum emission rate from None. None.0 43 OSe 5 t reconstruction permitb NJ.A.C. I7l27-22.16(e] If, Compliance Station Records No

502 - 0.62 tb/hr. Maximum emission limit based on None. None.U 43 OS1 6 the preconstruction permit. [N.J.A,C. 7:27-22.16(e)) In Compliance Station Records No

TSP - 0,66 tbhhr, Maximum emission rate from None None.U 43 OS1 7 1recnatraction permit. [N.J.A,C. 7:27-22.16(e)] In Compliance Station Records No

PM-1O (Total) n 0.66 Ibthr. Maximum emission rate None. None,0 43 OS1 8 from preconstrucbon permit [N.J.A.C. 7:27-22.16(e)] In Comptionce Station ReCords No

Generator fuel limited to lOw sulfur distillate oil. Monitored by review of fuel delivery records per Recordkeeping by manual tagging Of parameter perU 43 OS1 9 IN.J.A.C. 7:27-22.16(e)) delivery, Review bills of ladingtinvoices [N J.A.C. delivery it permanently bound toegbook or readily In Compliance Station Records No7:27-22.16(e)] accessible computer memory. [N.J.A.C. 7:27-22.16(e)]Maximum Gross Heat Input o= 2.87 MMBTU/hr (HHV). Other. Fuel burner rated capacity [N.J.A.C. 7:27- None.

U 43 OS1 10 Maximum gross heat input, based onr preconstruction 22.16(e)), In Compliance Station Records Nopermit. [N.J.A.C. 7;27.22.16(e)]

Total Hours of Operation n- toO hr/yr. Maximum Total Hours of Operabon: Monitored by hourbtime Total Hours of Operation: Recordkeeping by manualannual operating hours. [N,J.A.C. 7:27-22.16(a)] monitor continuously. based on one calendar year. logging of parameter each week during operation. TheThe permittee shall install, calibrate and maintain in permittee shall record in either a permanent bound logaccordance with the manufacturer's specifications. a book, or in readily accessible computer memories, freU 43 OS1 11 totalizing hour meter to monitor the total hours of weekly hours of operation of the generator and made In Compliance Station Records Nooperation per year for the emergency generator. available to the representatives of the Department of)N.JA C 7:27-22.16(at) Environmental Protection upon request for a period of

fie years after the date of each record, [N.J A.C. 7:27-22.16(e))

TSP = 0.3 1bdhr. Applies to each 60KW generator None. None.U 43 0S2 1 tOS2

-OS5o. [N JA C. T27- 4.2(a)] In Compliance Station Records No

U 43 OS2 2M-axmum Gross Heat Inpu <= u. MMBTIumhr IHHV).Applies to each 60KWVgenerator (OS2 - OS5).IN J.A.C 7:27-22 16(a)]

Other: Fuel burner rated cepacry[N.J.AC. /:27-22.16(a).

None.

In Conipliance Station Records No0

. ,80 0

Compliance Statru Method to Is a ComplianceftRe # ApplicnbleRequirement Monitoring Requirement Recordkeeping Requirement (In Compliance Oetermlne Schedutle Commentsrlr-Coliance) Complienre Attached? (Yes1N)

f louts of Opertibon <- 1,500 hryr total combined Hours of Operation: Monitored by pur~lime monitor ;Hours of Operation: Recoardkeeping by manual logginghours otoperation for (4) 60KW generators (OS2 - continuously, based on one calendar year. The of parameter each month during operation. TheOS5) (N.J.AC, 7:27-22. 16(a)l permitten shail install. calibrate and maintain in permiltee shall record in either a permanent bound logaccordance witn the manuracturer's specificationn, a book. or in readily accessible computer remories. theU 43 OS2 3 t.alizing hour meter to monitor the total hours of monthly hours o1 operation nt the generator and made In Corpliance Station Records Nooperation per year for the generator, JNJ AC 7:27- available to the representatives of the Department of22.16(o)J Environmentat Protection upon request for a period of

five yeaws after the date of each record [N.J.AC. 7 27-22 16(o)1

4CO -= 0.47 lb/hr. Applies to each 60KW generator Nune. NordU43 OS2 4 (OS2 - OS5) IN J A.Cý 7:27-2e2o.1(a)] V In Compliance Statin- Records No

NOOx (ITotal) <= 2,16 Ib/hr, Applies to each 60KW None None. In Compliarre staion Records NoU 43 S2 5 generator 1OS2 -051 IN.J.A C 7.27-22 16(a)o

PM-10 (Total) O b15 bfhr. Applies to each 60KW None, None.U 43 OS2 generator (OS2 - OS5). [N J A.C. 7 27-22.16(a)) In Compliance Station Records No

TSP - O 15 lb/hr. Applies to each 6OKW generator None. None.U 43 OS2 7 OS2 - OSS). N.JAGC 7:27-22.16(a)] In Compliance Statiorn Records No

U 1 OC (Tofall - O. 18 lblhr, Applies to each 6OKW None. None.U43 2 8 enerator (OS2 - OS5) [N.J.A.C. 7,27-22 16(a)) In Compliance Station Records NoISP -< 0.3 lblhr. Applies to each 60KW generator None. None.U 43 OS3 1 (OS2 - OS5) [NJ.A.C. 7:27- 4.2(a)] In Conrpliance Station Records No

Maximum Gross Heat input <- 0 5 MM6TU/hr (HHV). Other: PFel burner rated capacily[NJA.C 7:27- None.U 43 0S3 2 Applies to each 60KW generator (OS2 - OS5) 22.16(a)).

In Compliance Station Records NoN.J.A.C 7:27-22.16a)]

HoursofOperationo= 1.600 hr/yr total combined Hours of Operation: Monitored by houmryme monitor Iou/s of Operation. Recondkeeping by manual logginghours of operation for 14) SOKW generators (OS2 - continuously. based on one calendar year. The of plarmeter each mmrth during operation TheOS5). [N.J.AC 7:27-22.16(a)l permiltee srail install. calibrate and maintain in perlnioee shall record in enther a permanent bound logaccordance with the marnufacturer's specifications, a bcok, or in readily accessible computer memories theU 43 OS3 3 totalizing hour meter to monitor the total hours of mronthly hours of operation of the generator and made In Compliance Station Records Nooperation per year for the generator. INJA.C. 7.27- available to the representatives of the Department on22.161(o) Errvironorental Protection upon request for a period of

five years after tire date of each record. [N/JA.C 7:27-22.16(o)]

CO <= 0.47 I/hr. Appýlies to eacl O0KWgenerabo e Nore. None.U 43 OS3 4 OS2 -OS5). [NJAC. 7:27-22.161a)) In Compliance Station Records No4 OOx (Total)- = 2.16 lb/hr. Applies to each 60KW None. None.

U 43 0S3 S generator (0S2 - OSS). [N.J.A.C. 7:27-22.16(a)1 Jo Compliance Station Records NoPM-t0 (Totall v= 0.15 lb/rr. Applies to each 60KW None. None,U43 0S3 6 JOS).

[NJA.C. 727-22, f6(a)o In Compliance Station Records NoTSP = 0.15 Ib/hr. Applies to each 60KW generator None. None.(OS2In

Cmpliace Staion Records NoUOC (Total) <- 018 Wbin, Applies to each 60KW None. None.UJ 43 003 6 generator (OS2 -OS5). (N.J A.C. 7.27-22.16(a)]

In Conrrliance Station Records NoTSP <=03 Iblhr. Applies to each 60KW generator Noone. None.U 43 CS4 1 (OS270 OS5). 0 N0 J A[ . 7:27- 4 2(a)l

In Compliance Station Recolds NoMaximum Gross Hear Input 0=0.5 MMBTUIhr (HJtV). Other: Fuel burler rated capacity[N JA C, 7:27- None.

U 43 OS4 2 Appfies to each 6OKW generalor (OS2 - OS5). 22,16(a)), Il Compliance Station Records NoN.J.A.C. 7:27-22.16(a))

Hours of Operaion - 1,500 hr/yt total combined Hours of Operation: Monitored by hour/time monitor louos of Operation: Recordkeerping by manual logginghours of operation for (4) 6OKW generators (0S2 - continuously, based on one calendar year. The of pararreter each month during operation. TheOS5). IN JA C. 7.27-22 16(a)) permittee shall install, calibrate and maintain in permittee shalf record il either a permanent bound logaccordance with the manufacturer's specifications. a bhok, or ill readily accessible computer memories. OreU 43 OS4 3 totalizing hour meter to monitor the total hours of monthly hours of operation of the generator and made In Compliance Station Records Nooperation per year for the generator. NJ.A C. 7:27- available to the representatives of the Department of22.16(o)] Environmenital Protection upon request for a period of

five years after the date o1 each record. [N.JA.C 7.27-22,16(o))CO <= 0.47 1b11t1 Applies to eacch 6OKW generator None. NonelU 43 004 4 2OS O5), [N.J.A.C. 7.27-22,16la)[

In Compliance Station Records No4Ox (Total) <= 2.16101ilr. Applies to each 6OKW None. None.U 43 OS4 5 generator 1OS2 -0S5) [N,J,A,C. 7:27-22.16(a0] In Compliance Station Records No

PM-i 0 (Total) 0 00 15 lb/hr. Applies to each 60KW None. None.U43 OS4 16 generator (OS2 - OS6), [N.J.A.C. 7:27-22.16(a)] In Compliance Station Records No

Page 48 of 80

Se-tion 6 - Cumrpliance S•lM-rsPhC, Nuh'ar I'lC

I lop, Croek r-d SaMl Grn-rtioI/ Sftoiuo

Cormplianca Status Method to Is a CorrpliarceRat # Applicable Requirement Monitoring Requirement Recordikeeping Requirement (in Compliance Determine Schedule CommentsNon-Compliaice) Corrpltance Attched? (YeelNo)

TSP 0= 0.15 lb/hr. Applies to each 60KW generator None. None.U 43 OS4 7 (OS2 - OS5). [N.J.A.C. 7:27-22.16(a)] In Compliance Station Records No

VOC (Total) = 0.18 /bhr Applies to each 60KW None. None.U 43 0S4 6 generator (OS2 - OS5). INJAC. 7:27-22.16(a)] In Corpllonce Station Records No

TSP -= 0.3 1b/hr. Applies to each 60KW generator None. None,U 43 OS5 1 (OS2 - OS5) [N J.A.C. 7:27- 4.2(a)) In Compliance Station Records No

Maximum Gross Heat Input 0- 0.5 MMSTU/hr (HHV). Other: Fuel burner rated capaclty[N.J A C. 7:27- None.U 43 035 2 Applies to each 6OKW generator (OS2 - OS5). 22,16(a)] In Compliance Station Records NoS N.J.AC. 7,27-22.16(a)n

Hours of Operation -= 1,500 hr/yr total combined Hours of Operatioe: Monitored by hour/time monitor Hours of Operation: Recordkeeping by manua) logginghours of operation for (4)60KW generators (OS2- continuously. based on one calendar year. The of parameter each month during operation. TheOS5). [N.JA C. 7:27-22,t6(a)) permittee shag install. calibrate and maintain in permittee shall record in either a permanent bound log

accordance with the manufacturer's specifications. a honk, or in readily accessible computer memories. theU 43 OS5 3 totalizing hour meter to monitor the total hours Of monthly hours of operation of the generator and made In Compliance Station Records Nooperation per year for the generator. [N.J.A.C. 7:27- availabte to the representatives of the Department of22.16(.)] Environmeotal Protection upon request for a period of

fie years after the date of each record. IN.JA.C 7:27-22. 16(o)]

S4CO= 0.47 (b/hr. Applies to each 60KW generator None. None.U 43 000 d '(OS2 OS5). [N.J.AC. 7:27-22.16(a)) In Compliance Slatinn Records No

NOx (Total) - 2.16 tb/hr. Applies to each 60KW None. None.U 43 OS5 5 enerator (OS2 - OS5). [NJA.C+ 7:27-22.16(a)] In Compliance Station Records 14n

PM-i 0 (Total) -0 t 15 btnr. Applies to each 60KW None. None.U 43 005 6 generator (OS2 - aS5). [NJ.C. 7:27-22,16(a)) In Compliance Station Records NoTSP-= 0.15 Iblhr. Applies to each 60KW generator None. None.U43 OS5 7 (052 - OS5). [N.J+A.C. 7:27-22.16(a)] .In Compliance Station Records No

VOC (Total) = 0.18 (b/hr. Applies to each 60KW ,None. NoSe.U 43 OS g 6 generator (OS2 - OS5). [N.J.A.C. 727-22.16(a)] Fe Compliance Statis Records NoTSP -= 0.42 Ibmhr. Applies to each 74KW generator None. None.

U 43 006 t (OS6 - OSO). [N.J.A.C. 7:27- 4.2(a)] In Compliance Station Records No

Maximum Gross Heat Input no 0.7 MMBTUIhr (HHV) Other: Fuel burner rated capacfty[N.J.A.C 7:27- None.U 43 OS6 2 Applies to each 74KWgenerator (OS6 - OS1O) 22.16(a0).

In Compliance Station Records NoN.J.AC. 7:27-22.16(a)]

HFours of Operaton -= 1,000 hr/yr total combined Hours of Operation: Monitored by Imourime monitor Hours of Operabon. Recordkeeping by manual loggingrours of operation for (5) 74KW generator (OS6 - continuously. based on one calendar year. The of parameter each month during operation. The0S10). [N.J.A.C. 7:27-22.16(a)] permilttee shag install, calibrate and maintain in permittee shall record in either a permanent bound logaccordance with the manufacturer's specifications, a book. or in readily accessible computer mnemnores, the

U 43 OS6 3 totalizing hour meter to monitor the total hours Of monthly holus of operation of the generator and made In Compliance Station Records Nooperation per year for the generator. IN.J.A.C. 7:27- available to the representatives of the Department of22.16(o)] Environmental Protection upon request for a period of

oive years after the date of each record. JNJ.A.C. 7:27-22.16(o)]

CO 0 0.68 lb/hr. Applies to each 74KWgenerator None. None.U 43 006 14 (06-OSaO), [N.J A.C. 7:27-22.16(a)] In Compliance Station Records NoNOx (Total) 0= 3.15 (b/hr. Applies to each 74KW None. None.U 43 006 6 generator (OS6 -O10), [N.J.A.C. 7:27-22.16(a)) In Compliance Station Records No

PM-10 (Total) -= 0.22 b/hr. Applies to each 74KW None. None.U 43 OS6 6 generator (OS6 -OS10). [N.J.A.C. 7:27-22.16(a)) in Compliance Station Records No

S02 0 0.06 lbhlrr. Applies to each 74KW generator None. None.U 43 OS6 7 (OS6 - OStO). [N.J A.C. 7:27-22.t6(a)l In Compliance Station Records No

TSP <=0.22 lblhr. Applies to each 74KW generator None. None.U43 OS6 8 (0S6 -OS10). N.JAC. 7:27-22.16(a)) In Compliance Station Records FN

VOC (Total) -= 026 Ih/hr. Applies to each 74KW None. NoneU 43 OS6 9 generator (OS6 -OS10). [N.J.A.C 7:27-22.16(a)] In Complinrce Station Records No

TSP = 0.42 Ib/hr. Applies to each 74KW generator None None.U 43 007 t S S0 NJAC :7 .() In Conrpliarrce Station Records No1006 - OSlO). )N.J.A.C. 7:27- 4.2(a~l

Maximum Gross Heat Input n 0.7 MM6TUIhr (HHV). Other: Fuel burner rated capacty[N.JA.C. 7:27- None.U 43 00 7 2 [Applies In each 74KWgenerator (086 - OSO). 22.16(a)).

In Compliance Station Records No[N.J.A.C. 7:27-22.16(a))

.at 6

SCreet rod Srm r nr 6i Stotion s

Complianee Status Method to 1t a CompletanrReft # Applicable Requirement Monitoring Requirement Recordkeeptng Requirement (It Co.pliance Drtlerine Schedule Comments

Non-Compliaece) Co-pliline Attached? (Yesltot)

Hours of Operaton <- 1,000 hry total combined I itours of Operation: Monitored by hourfrime monitor tours of Operation: Recordkeeping by manual logginghours of operation for (5) 74KW generator (OS6 - continuously, based on one calendar year. The of parameter each month during operation TheOSI 0)5 [NJ.AC. 7:27-22.16(a)] permittee shalt instalt, calibrate and maintain in permiltee shall record in either a permanent bound tog

accordance with the manufacturers specifications. a boots, or in readily accessible computer memories, theU 43 OS7 3 totaliziog hour meter to monitor the total hours of monthly hours of operation of the generator and made In Compliance Station Records Nooperation per year for the generator. INJA.C. 7:27- available to the representatives of the Department of

22 16(o)] Environmental Protection upon request for a pednd offive years after the date of each record. [NJ.A.C. 7:27-22.16(o)(

CO -0.68 lbohr. Applies to each 74KW generator ,,onre. None,U 43 OS7 4 lOS6 - OSt10) [N.J AC. 7:27-22.16(a)) In Compliance Station Records NoNOx (Total) - 3 15 tb/hr. Applies to each 74KW Noone. None.U 43 OS7 5 eneratorr(OS6SOS10).(NJA.C 7:27-22.16(a)]

In Compliance Station Records NoPM- 10 (Total) ;= 0.22 lb/hr. Applies to each 74KW None. None.

S4generator (OS6 - OStO). iN.J.A.C. 7:27-22.16(a)n

S02 = 0.06 tlbhr. Applies to each 74KVV generator None. None.U 43 OS7 7 (OS6 -0Oso) [N.J.A.C. 7:27-22.16(a)] to Compliance Station Records No

TSP = 0.22 Ib/hr. Applies to each 7NKW generator Nmre. None.U 43 OS7 (8SOS OS10). [N.JAC. 7:27-22.16(a)] In Compliance Station Records No

VOC (Total) = 0.26 blhtrr. Applies to each 74KW None. None.U 43 gS7 generator (OS6 - Osl). [NJAC 7:27-22.16(a)] In Compirance Station Records No

I TSP -= 0.42 Iblhr. Applies to each 74KW generator None. None.U 43 OS8 tOSS - Oslo) [NJA C. 7.27- 4.2a)] In Compliance Station Records No

Maximum Gross Heat Input -= 07 MMBTU/hr (HHV). Other: Fuel burner rated capacity[N J.A.C. 7:27- None.U 43 OS8 2 Applies to each 74KW generator (OS6 - OS 10)., 22.16(a)]. In Compliance Station Records No(N J.A.C 7:27-22, l6a))

Hours of Operation -= .1.000 hryr total combined Hours of Operation: Monitored by hourrltire monitor Hours OfOperalbon Recordkeeping by manual logginghours of operation for (5) 74KW generatorf(OS6- contiruously. based on one calendar year, The of parameter each month during operation. TheOS 10). IN JA.C. 7:27-22,16(a)] perrittee shagl install. calibrate and maintain in permittee shall record in either a permanent bound log

accordance with the manufacturer's specificatiuos. a book, or in readily accessible computer memories, theU 43 OS8 3 totalizing howr meter to monitor lhe total hours of monthly hours of operation of the generator and made In Compliance Station Records Nooperation per year for the generator [N.J.A C. 7:27- available to the representaotives o1 the Department of

22.16(o)] Envirocrmentel Protection upon request for a period oflive years after the date of each record. iN J.A.C. 7:27-22.16(o))

U 4 CO 068 buhr, Applies to each 74KW generator None None,U 43 056 4 )OS6 - OS1O) iN J A.C. 7:27-22 16(a)]

In Corpliance Station Records NoNOo (Total) = 3 15 gbuhr. Applies to each 74KW None. None.

U 43 OS g generator (OS6 -Os10). )N.J.AC. 7:27-22.16(a)] In Compliance Station Records NoPM-1O (Total) - 0.22 lbhrr Applies to each 74KW None, None.Uenerator (OS6 -OS10). [NJA.C

Compliance Stto Record No0S2 = 0.06 ibfhrr. Applies to each 74KW generator None, None.U 43 OS8 - 7 (0S8.OS-O). INJ A C 7:27-22.16(a)]

tn Conpliance Station Records feTSP = 0.22 (b/hr. Applies to each 74KW generator None. None.

* 43 OS8 8 (OS l -OslO) .N J A C. 7:27-22,16(a)] In Compliance Station Records NoVOC (Total) -= 0.26 lb/hr. Applies to each 74KW None. None.

U43 OS8 9 generator (OS6 -OS10) iN.J.A.C. 7:27-22.16(a)] In Compliance Station Records No

TSP -= 0.42 tb/hr. Applies to each 74KW generator None. None.U 43 OS9 1 (06-OSlO). (N.J.A.C. 7:27- 4.2(a)]

In Compliance Station Records NoMaximum Gross Heat Input = 0.7 MMBTU/hr (HHV). Other: Fuel burner rated capacityIN.J.A C 7:27- None.

U 43 OS9 2 Applies to each 74KW generator (OS6 - OSlo) 22.16(a)]. In Compliance Station Records No[NJ A C. 7.27-22 16(a))

Hours of Operation - 1,000 hrlyr total combined Hours of Operation: Monitored by hourihgme monitor Hours of Operation: Recordheeping by manual logginghours of operation for (5) 74KW generator (OS6 - continuously. based on one calendar year. The of parameter each month during operation. TheOSlo) IN J.AC, 7:27-22.1O(a)) permittee shag install, calibrate and maoitain in permibtee shall record in either a permanent bound log

accordance with the manufaoturer's specifications, a book. or in readily accessible computer memornies, theU 43 OS9 3 totalizing hour meter to moontor the total hours of monthly hours of operation of the generator and made In Compliance Station Records Nooperation per year for the generator, (N.J.A.C. 7:27- available to the representatives of the Deparl.ont of

22.16(.)] Environmental Protection upon request for a period offive years after the date of each record IN J A.C 7:27-22.16(0)l

CO - 0.68 tblhr. Applies to each 74KW generator None. NNone.U43 OS9 4 ro6--OSl0). iN.IA.C. 7:27S22.o6(a))

In Compliance Station Records No

Page 50 of 80

Sention 6 - Cpli n. ce StaiusPSEG N-c1-ar ,LC

I h1,pc Cr-ek and SalCev Gr-ir atlr.g Stattion

Compliance Status Method to Is t CompllanceRef # Applicable Requirement Monitoring Requirement Recordkeeping Requirement fin Compliance Deteroine Schedule CommentsNon-Corpliance) Comrplince Attached? lYeINo)

NOx (Total) <= 3.15 (b0hr. Applies to each 74KW None. None. In Compliance Station Records NoU 43 O~~g 5 generator (OS6 - OS10)ý [NJ.A.C. 7:27-22.16(a)]

I opine SainRcrs NPM-10 (Total) - 022 lb/hr. Applies to each 74KW None, None.U 43 OS9 6 generator (OS6 - OSlo) [N.J.AC. 7:27-22.16(a)]

In Compliance Station Records NoS02 0 06 lb/hr. Applies to each 74KW generator None, None.U 43 OS9 7 (OS6 - OSlo). (N.J.AC. 7:27-2216W)]

In Compliance Station Records NoTSP - 0.22 lbihr. Applies to each 74KW generator None. None.U 43 OSg 6 (0S6 - OSlo), [NJ A.C. 7:27-22.16(a)]

In Compliance Station Records NoVOG (Total) - 0.26 ltOhr, Applies to each 74KW None. None.U 43 OS9 9 generator 0os6 -OSO0). [N.J.A.C. 7:27-22.16(a)]

In Compliance Station Records NoTSP -= 0.42 lb/hr. Applies to each 74KW generator None, None.U 43 OS10 1 (OS6 - OSIO)ý (N.J.A.C, 7:27- 4,2(a))

In Compliance Station Records NoMaximum Gross Heat Input -= 0.7 MMSTU/hr (HHV). Other: Fuel burner rated capacity[NJ.A.C. 7:27- None.

U 43 OS1O 2 Applies to each 741KWgenerator tOS6 - Os1l). 22,16(a)]. In Compliance Station Records No[N.JA.C 727-22.16(a)]

Hours of Operation = 1,000 hrlyr total combined Hours of Operation: Monitored by heurltfme monitor Hours of Operation: Recordkeeping by manual logginghours of operation for (5) 74KW generator (106 - continuously, based on one calendar year. The of parameter each month during operation TheOSlo) [N.J.A.C. 7:27:22.16(a)] permittee shall install. calibrate and maintain in permittee shall record in either a permanent bound logaccordance with the manufacturer's specifications. a bonk. or in readily accessible computer nmemories, theU 43 OS10 3 totalizing how meter to monitor the total hours of monthly hours of operation of the generator and made In Compliance Station Records Nooperation per year for the generator. ]N.J.A.C. 7:27- available to the representatives of the Department of22.16(0)] Environmental Protection upon request for a period of

rive years after the date of each record. [N J.A C. 7:27-22.16(o))

CO -= 0.68 b/hr. Applies to each 74KW generator None, None.U 43 OS10 4 10S6 -OSl0). [N.J.A.C. 7:27-22,16(a)] In Compliance Station Records No

NOx (Total) -= 3 15 0b/hr. Applies to each 74KW None, None.U 43 OSlo 5 generator (OS6 - OS10). (N.J A.C. 7:27-22,16(a)) In Compliance Station Records NoPM- 10 Tota11 -= 022 1b/hr Applies to each 74KW None. None.

U043 OSO 6 generator (OS6 - Os10.N.J.A.C, 7.27-22,16(a)] In Compliance Station Records NoS02 -= 0.06 Ibrhr, Applies to each 74KW generator None. None.

U143 OS10 7 (OS6 - OSO). ]NJ.A.C. 7:27-22.16(a)] In Compliance Station Records No

TSP = 0.22 lbhhr. Applies to each 74KW generator None, None.U 43 OSlo (OS6 - OSlo). [NJ.A.C. 7:27-22.16(a)] In Compliance Station Records No

VOC (Total) -= 0.26 ibthr. Applies to each 74KW None, None.U 43 OSlo 9 generator (OS6 -OS10). (N.J.A.C 7:27-22.16(a)l In Conrliance Station Records No

TSP - 0.48 lb/hrr. Applies to each 1OOKW generator None. None.U 43 0011 1 (OS1 I OS15). [N.J.AC, 7:27- 4.2(a)] In Compliance Station Records No

Maximum Gross Heat Input -= 0.8 MMBTU/hr (HHV). Other: Fuel burrer rated capacity(NJ.A.C. 7:27- None.U43 OS11 2 Applies to each 100KW generator (OS11 - OS15). 22.16(a)]. In Compliance Station Records No(N.JA C. 7:27-22.16(a)]

Hours of Operation = 1,000 hrtyr total combined Hours of Operation: Monitored by hour/bme monitor Hours 01 Operation Recordkeeping by manual logginghours of operation for the five 100 KW generators continuously. based on one calendar year. The of parameter each month during operation. The(OS1I -0S15). )N.J.A.C. 7:27-22.16(a)] permiftee shal install, calibrate and maintain in permittee shall record in either a permanent bound logaccordance with the manufacturer's specihfcations. a honk, or in readily accessible computer memories. thetotalizing hour meter to monitor the total hours of monthly hours of operation of the generator and madeU43 OSll 3 operation per year for the generator.N.J.A C. 7:27- available to the representatives of the Department of In Compliance Station Records No22.16(e) &. [N JA C. 7:27-22.16(o)] Environmental Protection upon request for a period of

live years after the date of each record N.J.A.C. 7:27-22.16(e) &. [N.J.A.C. 7:27-22.16(o)]

CO -= 0.76 Iblhr. Applies to each 100KW generator None, None.U 43 OStl 4 [(OSl - OS15). ]NJ.A.C. 7:27-22.16(a)] In Compliance Station Records No

NOx (Total) -= 352 1b/hr. Applies to each 1OOKW None, None.U 43 0S11 5 enerator (OS11 - OS15)ý [N.J.AC. 7:27-22.16(a)] In Compliance Station Records No

PM-t0 (Total) -= 0.25 lb/hr, Applies to each tOOKW None, None. •U d3 USII1 6 eear(O1-US5) NJAC727216)]In

Compliance Station Records Nogenerator (OSItI -061I5). ]N.J.AC. 7:27-22116(a))S02 = O.07 ib/br. Applies to each 100KW generator None, None.U 43 OS11 7 (OS11 - OS15). [N.J.A.C. 7:27-22,tS(a)l

In Compliance Station Records NoTSP = 0.25 lb/hr. Applies to each 10OKWgenerator None. None.U43 OSIl 8 (OSl 1OS15) [NJA.C 7:27-2Z

to(a)] InCompliance Station Records No

. 160 0

erti •6 lBce Starns

Compliance Status Method to h cri Compliance

Ref # Applicable Requirement Monitoring Requirement Recordkeeptag Requirement (to Compliance Determine Schedule Comments

Non-CompliSae) Compliance Attached? C erslNo)

9 VOC (Total) -= 0.29 blhr. Applies to each 100KW None. NoneRU 43 0811 generator (OSll - OS19). [N.J.A.C. 727-22.16(a)] In Compliance Station Records No

TSP - 0.48 lb/br. Applies to each 100KW generator None. None.U 43 0812 I (UOSII -OS15). IN.J.A.C. 7.27-4.2(a)] In Compliance Station Records No

Maximum Gross Heat Input = 0,8 MMBTUIhr (HI-V). Other: Fuel burner rated capacjty[N.J.A.C. 7:27- None.

U43 OS12 2 Applies to each lOOKWgenerator (OSll - OS15) 22.16(a)j" In Compliance Station Records No[N.JAC. 7 27-22.15(a)[ '

Hours of Operahon -= 1,000 hrtyr total combined Hours of Operation: Monitored by hourIlfine monitor Hours of Operation: Recordkeeping by manual logginghours of operation for the five 100 KW generators continuously, bh7cl on one calendar year. The of parameter each month daring operation. The(OS11 0-0815). [N JAC, 7:27-22.1S(a)l permittee sha0l install. calibrate and maintain in peenittee shall record in either a permanent bound log

accordance with lye manufacturer's specifications. a book, or in readily accessible computer memories, the

0 43 012 2otalizing hour meter to monitor the total hours of monthly hours of operation of the generator and madeoperation per year for the generator N J.A.C. 7:27- available to the representatives of the Department of In Compliance Station Records No

22,16(e) &. [N.J A.C. 7T27-22 16(o)1 Environmental Protection upon request for a period offoe years after the date of each record N.JA.C. 7:27-22.16(e) 8. [N JAC. 7:27.22,1[(o)]

CO - 0.76 lb/hr. Applies to each 100KW generator None. Noon.U 43 OS12 4 tDSoI -OS15) [N JAC 7:27-22.16(a)] In Compliance Station Records No

NOx ITotal) -= 3 52 Ib/hr. Applies to each I 0OKW None. .None.U 43 OS12 5 generator 0OS I OS15) [NJ.A,C. 7:27-22.t1(a)l In Compliance Station Records No

PM-10 (Total) - 0 25 Ibdwr. Applies to each 100KW None. . None.U 43 OS12 a genierator (OSt I - OS15)ý [NAC. 7:27-22 6(,a)I In Compliance Station Records No

002 = 0.07 Iblhr. Applies to each 1001KW generator None None.043 0012 1 OS11 -0015) [N J A.C. 7:27-22.16(a)l In Compliance Station Records No

lSP 0= 0251b51r. Applies to each 1tOKW generator None NoneU 43 OS12 8 1OS1I - US15). IN J AC. 7:27-22.16(a)0 In Compliance Station Recolds No

VOC (Total) = 0.29 lhlhr Applies to each 100KW None. None.U 43 0S12 9 generator OSll -OS15). IN.J.AC. 7:27-22.16(a)] In Compliance Station Records No

ISP 0 0.48 lb/hr. Applies to each 100KW generator None. None

U 43 OS13 (OStI -OS15). [N.J.A.C 7:27- 4.2(a)] In Compliance Station Records No

Maximum Gross Heat Input c= 0.8 MMBTU/hir (HHV). Other: Fuel burner rated capacity[N.J.A.C. 7:27- None,

U 43 0613 2 Applies to each 10QKW generator OS0 1 - OS15). 22.18(%. t Compliance Station Records Na

N.J.A.C. 7:27-22.16(a)8

Hours of Operation -= 1,000 lrtyr total combined Hours of Operation: Monitored by hourltrie monitor tours of Operation: Recordlreeping by manual logginghours of operation for the five 100 KW generators continuously, based on one calenrdar year. The of parameter each month durirg operation. The[(0011 -0015). [N.J A.C. 7.27-22.16(a)1 permittee shagl install, calibrate and maintair in perordlee shall record in either a permanent bound log

accordance with the msrubacturero speciicattoirs, a boou, or ir readily actessible -moputer memoreis, ilreU43 0S13 3 totalizing hour meter to monitor the total hours at morthly hours of operation of the generator and made

operation per year for the generator N.J.A.C. 7:27- available to the representatives of the Department of In Compliance Station Records No

22.1t6(e) . [N.J A.C. 7:27-22.16(o)] Environmental Prolection upon request for a period offWe years after the date of each record N J.A.C. 7:27-22.16(e) & IN J A.C. y:27-22.g1(o)]

CO '= 0.76 Ib/hr. Applies to each IOOKW generator None. None..

0O43 0013 4 01 -00815) [NJA C. 7:27-22.16(a)) In Compliance Station Records No

NOx (Total) -= 3.52 Whir. Applies to each 1 0KW None. None.U 43 OS13 5 generator (OSll r OS15) [N.JAC. 7:27-22.16(a)] In Compliance Station Records No

PM-100 (Total) -0.25 thir. Applies to each 100KW None, None.0 43 O813 g generalor 10011 -0015) [N J.A.C. 7:27322.g6()] to Comp!liance. Station Records No

0S2 0 0.07 Ib'h.r Applies to each 10OKW generator None. lone.043 0S13 7 IOSll -OS15). [N.J.AC. 7:27-22.16(a)[ In Compliance Station Records No

tSP 0 0.25 Uhlhr Applies to each 100KW geoerator None. None.U 43 OS13 9 10011 -0815) INJ A.C 7:27-22.161a)1 In Compliance Station Records Ho

VOC (Total) -= 0.29 Ilhr. Applies to each 100KW None. None.U 43 OS13 9 generator (OS1 I OS15). IN.JAC. 7:27-22,16(a)N In Compliancs Station Records No

TSP -= 0.48 lblhr. Applies to each 100KW generator None. None.U43 OS14 1 (OS1 I -O015) [N J A C. 7:27-4.2(a)l In Compliance Station Records No

Maximunmn Gross Ileat Input 0 0.8 MMT Ulhr IHtIVI. Other: Fuel burner rated capacity[N.J.A.C. 7:27- INone.

U 43 OS14 2 Applies to each 1OOKW generator (OS11 - OS15) 22.16(a)], In Compliance Station Records No[N.JA.C. 7:27-22.16(a)]

Page 52 of 80

Se-tia 6 - Cormpliatre StatisPNtcG N--ar 11C

I tjpe Crock a-d &fller Genetrating Strtions

Compliance Status Method to It a ComplianceRef # Applicable Requirement Monitoring Requirement Recordkeeptng Requirement (I. Copliance Determine Schedule CommentsNo-Cemrpliancii) Complianlce Attached? (Yes/No)

Hours of Operaton < 1,000 hrlyr total combined Hours of Operation: Monitored by hourdtime monitor Hours of Operator: Recordkeeping by manual logginghours of operation for the five 100 KW generators continuously, based on one calendar year. The of parameter each month during operation The'OS11 -OS15). [N.J.A.C. 7:27-22.16(a)] permitten shall install, calibrate and maintain in permiltee shall record in either a permanent bound logaccordance with the manufacturer's specifications. a honk, or in readily accessible computer memories. thetotalizing hour meter to monitor the total hours of monthly hours of operation of the generator and made0 43 OS14 3 operation per year for the generator N.J.A.C. 7:27- available to the representatives of the Department of to Compliance Station Records No22.16(e) 1. [N.J.A.C. 7:27-22.16(o)] Environmental Protection upon request for a pehod of

five years after the date of each record NJ.A.C. 7:27-22.16(e) &. [N.J.A C. 7:27-22.16(o)]

CO - 0.76 lblhr. Applies to each 1OOKW generator None. None.U 43 OS14 4 (OSd 1 - OS15). [N.J.A.C. 7:27-22.16(a)] In Compliance Station Records No

NOx Total) < = 352 Ib/hr. Applies to each 100KW None. None.U 43 OS14 5 generator (OSI I - OS15). [N.J.A.C. 7:27-22.16[a)) In Compliance Station Records NoPM-10 (Total) -o 0.25 Ibthr. Applies to each 100KW None. None.042 OSt4 g generator (0511 - OS15). [N.J.A.C. 7:27-22.16(a)] In compliance Station Records No

S02 -n 0.07 Iblhr. Applies to each 100KW generator None. None.U43 OS14 7 (OS11 - OS15). (N.J.A.C. 7:27-22.16(a)] In Compliance Station Records No

TSP n- 0.35 lb/hr. Applies to each 10OKW generator None. None. In Compliance Station Records No0 43 OS14 8 (OSI I - OS15). [N J A.C. 7:27-22.161a)]

In Compliance Station RecordsVOC (Total) -= 0.59 lblhr. Applies to each 100KW None. None.,U 43 OS14 9 generator (OS1 0 - OS15). [N.J.A.C. 7:27-22.16(a)l

In Compliance Station Records NooSP n 0.48 lb/hr. Applies to each tOOKW generator None. None.U 43 OS15 I 1OS11 1 OS15. [N.J A.C. 727- 4.23a)1 In Compliance Station Records No

Maximum Gross Heat Input = 0,8 MMBTU/hr (HHV). Other. Fuel burner rated capacity[N.J.A.C 7:27- NoneU 43 OS15 2 Applies to each 100KW generator (OS11 - OStS). 22.16(a)),

In Compliance Station Records NoN.J.A.C. 7:27-22 16(a)]

Hours of Operation n= 1,000 hrlyr total combined Hours of Operation: Monitored by houorbme monitor Hours of Operation: Recordkeeping by manual logginghours of operation for the five 100 KIN generators continuously. based on one calendar year. The of parameter each month during operation. ThetOS1 1 - OS15). [N.J.A.C. 7:27-22.16(a)) pernittee shaut install, calibrate and maintain in permittee shall record in either a permanent bound logaccordance with the manufacturer's specifications, a book, or in readily accessible computer memories. the0 43 OSt5 0 totalizing hour meter to monitor the total hours of monthly hours of operation of the generator and madeoperation per year for the generator N.J.A.C. 7:27- available to the representatives of the Department of In Compliance Station Records No22.16(e) &. [N.J.A C. 7:27-22.16(o)] Environmental Protection upon request for a period of

five years after the date of each record N.J.A.C. 7:27-22 16ge)&. [N.J.A C. 7:27-22.16(o)]

CO n= 0 76 Ibhr. Applies to each 100KW generator None. None.U43 OS150 4 IOSll -OS15). [N.J.A.C. 7:27-22.16(a)] In Compliance Station Records No

NOx (Total) n 3 52 lb/hr. Applies to each 10OKW None. None.U43 OS15 5 generator [OS11- OS15). [N J.A.C. 7:27-22.t6(a)l In Compliance Station Records No

PM-10 (Total) - 0250b1hr. Applies to each 100KW None. None.U 43 OS15 6 generator (OS1h I OS15). N.JýAC 7:27-22.16(a)) In Compliance " Station Records No1 002 n 0.07 1b0hr. Applies to each 100KW generator None. None.0 43 0010 10fS1 - OSt5). [N.J.A.C. 7:27-22.16(a)] In Compliance Statino Records No

tSP <- 0.25 Ib/hr. Applies to each 10tKW generator None. None.U43 OS15 8 OSll -OS15) [N.JAC. 7:27-22.16(a)] In Compliance Station Records No

SVOC (Total) n- 0.29 lbhr. Applies to each 10OKW None. None. -0 43 0515 9 nrtr[S1-O1) [ ... 72-21()

In Compliance Station Records Nogenerator 10011 - OSIOI. IN.J.A.C. 7:27-22.16(a)]TSP 0 0.58 lbuhr. Applies to each 125KW generator None None.U 43 OS16 1 1OS6 - OS10) IN.J.AC. 7:27- 4.2(a)]

In Compliance Station Records NoMaximum Gross Heat Input <- 0.97 MMSTU/hr IHHVI Other: Fuel burner rated capacdtylN.JA.C. 7 27- None.U 43 OS16 2 Applies to each 125KW generator (OS16 - OSt)l 22.tg6(a)

In Compliance Station Records NoIN.J.A.C. 7:27-22.A6(a)l

Hours of Operation 0 750 hr/yr total combined hours Hours of Operation: Monitored by hourltime monitor Hours of Operation: Recordkeeping by manual loggingof operation for the three 125 KW generators (OS16 - continuously: based on one calendar year. The of parameter each month during operation. TheOS18). N.J.A.C. 7:27-22.16(a)l permittse shall install, calibrate and maintain in permittee shall record in either a permanent bound logaccordance with the manufacturer's speciications, a book, or in readily accessible computer memories, theU43 OS16 3 rotalizing hour meter to monitor the total hours of monthly hours of operation of the generator and made In Compliance Station Records Nooperation per year for the generator. [N.JA.C. 7:27- available to the representatives of the Department of22.16(o)] Environmental Protection upon request for a period of

rWe yeas after the date of each record. INJA.C. 7:27-22.16(O)]

.f 80g 0

Sect/ott6 h Sce tiluttPSEG9 LLIC

Compliance Status Method to I a CorpiaenceRef I Applicable Requirement Monitoring Requirement Reconrdkeeplng Requirement j in Compliance Doterrr Sched.le " Comments

N ont Cornpliance) Compliance Attached? (YestNn)

CO < 92 b/hr. Applies to each 125KW generator None. None.U843 OS16 4 (OS16 - OS18). [N.J.A.C. 7:27-22.16(a)] In Compliance Station Records No

U 301 .NOx (Total) -= 4.28 Ibthr. Applies to each 125KW None None. rCmlac tainRcrs NI I3 81 5 geeto(S1- OS18, (N.JA., 7:27-22.16(a)] geerto Compianc SaIonRcrs

U4 16 6 Pf'10 (Total) - 0,3 Ib/hr. Applies to each 125KW None. None. I opine SainRcrs N

g enerator (OS IS - OS18). JN.J.A C. 7:27-22,16(a)aTS2 - 008 1bh. Applies to each 125KW generator None. None.U 43 OSt1S 7 OS16 - OS18) N.J.A.C. 727-22.16(a)a

In Compliance Station Records NoMen-oP r 0.3 h1-. Applies to each 125KW generator None. NoneU43 OS16 2 AOs16 -tOS18), e N.J.A.C. 7:27-22.16(a)]

In Compliance Station Records No9 4OC (Total) -= 0 35 lb/ht. Applies' to each 125KW Non aNone.

U 43 816 I generator (OS16 - OS8).I NJa.AC. 7:27-22.16(a)] I. Compliance Station Records No

TSP or tO58 Ib/hr e Applies 1o each 125KW generator- cNone. None.U43 0317 1 1:1 ilStt -OemB)t [NhJuA C. 7t27- 4.2ca)t In Compliance Station Records No

acximdum Gross Heat Input m c 0.97 MMBTUint (HHV). other* Fel burner rated cnpacity[Nu .A.C. 7i27n NoneU 43 OS17 2 tAppries to each 125KW generator (OSh16 - OSea8). 22 16(a)]t

In Compliance Station Records NoNq JA C. 7:27-22.16(a)]

Hours of Operation -= 750 hr/yr to'.al combined hours H;ours of Operation: Monitored by heurftfme monitor flours of Operation: RecordKeeping by manual loggingof oper"'fion for the three 125 KW generators (OS16 - continuously, based on one calendar year. Tire of parameter each month during operation. TheOS 18)ý [N J.A C. 7:27-22A16(a)} permftte shall install. calibrate and mointaini in p•ermftlee $hall record in either a permanent bound log

accordance with the manufacturer's specifications. ?, book, or in1 readily accessible computer memories. fireU 43 OS 17 3 totalizing hour meter to monitor tire total hours of monthly hours of operation of the generator and made In Compliance Station Records Nooperation per year for the generator. [N.J.AGC 7:27- available to the representatives of the Department of22 16(o)] Environmental Pi•ntectixn upon request for a period of

rhe years after the date of each record [N.J.A.C. 7:27-22.1610)1

CO = 0.92 tb/hr. Applies to each 125KW generator None. None.U 43 OS17 4 O S- 8) [N 7 7AIn Compliance Station Records No(O.-S 18lO J. 7:27-22.16ta))

NOx (Total) < 4.26 tb/hr. Applies to each 125KW None. None.U 43 OS17 5 generator (OS16 - OStB). [NJA.. 7:27-22,16(a)] In Compliance Station Records No

PM-10 (Total) « 0.3 tb/hr. Applies to each 125KW None. NoneU 43 O017 generator 8OS16- OS18 . [N.JA.C. 7:27-22.16(a In Compliance Station Records NoS02 <= 0.8 tblhr. Applies to each 125KWgeneraT;r Nýone None.U43 0017 7 OS16 -018) N.J.AC. 7:27-22.16(a)) In Compliance Station Records No8 SP = 0.3 IbWhr. Applies to each 125KW generator None. None.

U 43 OtS7 0 (OS56 OS18). [NJAC 7:27-2 2

.16ta)) In Compliance Station Records No

VOC Totatl) - 0.35 tbitr. Applies to each 125KW None. Norm.U 43 S1M7 I generator (OS18- OS8. [N.J.A.C. 7:27-2216ta)) to Comrtpiance Station Records No

TSP - 0.58 lb/hr. Applies to each 125KWgenerator None. None.U 43 OS18 (OS18 -OS18). [N.J.A.C. 7:27- 4,2(a)[ it Corptiance Station Records No

Maximum Gross Heat Irputt -0.97 MMBTUlhr (HHV). Other: Fuel burner rated capacifty[NJ.AC. 7:27- None,U43 OS18 2 Applies to each 25KWgenerator (OS16- OS18). 22,16(a)).

In Compliance Station Records No[NJA.C. 7:27-22.16(a)[

Hours of Operation - 750 rrlyr total combined thours Hours of Operation: Monitored by heur/thie monitor Hours of Operaton. Recordkeeping by manual loggirgofoperation for the three `125 KWggenerators (OS16- continouusly, bhsed on one calendar year. The ofpparametereachmonthduriog operationr TheOS18), [N.J.A.C. 7:27-22.16(a) perroiltoe shafo irnstall, calihrate and maintain in - permitee shall record in eiher a permanent bound logaccordance with the manufacturer's specifications a book, or in readily accessible computer memories, theU43 OS18 3 totalizing hour meter to monitor the total hours of - rornthly hours of operation of the generator and made In Compliance Station Records Nooperation per year for the generator. (N J.AC,. 7.27- asvailable tothe repr esertatives of the Department of22,18(o)) Environmental Protection uport request for a period of.- -five years after the date of each record. [N.J.A.C. 7:27-

22.16(o)[ "CO - 0.92 lb/hr. Applies to each 125KW generator None. None.

U 43 018 4 (OS816 -OS18). JN.J A.C. 7:27-22.16(a)) In Compliance Station Records No

4NOn (Total) f- 4.26 1b1hr. Applies to each 125KW None. Noneeg43 OSt8 generator (OS16 - OSf8). [N.J.A.C. 7:27-22.16(a)) to Compliance Station Records No

PM-10 (Total) -= 03 lb/hr. Applies to each 125KW None. None.U 43 OS18 6 generator (OS16 - OS18). INJAC. 7:27-22.16(a)[ In Compliance Station Records No

302 « 0.08 bt/hr. Applies to each 125KW generator None, None.U 43 OS18 7 (OS16 - OS18). [N.J.A.C. 7:27-22.16(a)] th Compliance Station Records No

TSP « 0.3 lblhr. Applies to each 125KW generator None. NoneU 43 OS18 8 'OS1s OS 18) JNJA.C 7.27-22.16(a)] In Compliance Station Records No

Page 54 of 80

Se-tion 6 - Cr•m plIance StaIs1.EG Nuocler tI,.C

I Iore Crook and &,leo Gencrating Sttions

Compliance Status Method to Il a CoepliincoRat lit Applicable Requirement Monitoring Requng Requierement (I. Compiance Determine Schedule CommentsNo-comptian} Coeplione Attached? (Yes/qime)

VOC (Total) <= 0.35 lb/tt. Applies to each .125KW None. None,U43 OS18 9 generator (OS16 - OS18). (N.JA.C. 7:27-22.16(a)) In Compliance Station Records No

U 43 OS19 i TSP - 0.98 1b1hr. [N.J.A.C. 7:27- 4.2(a)) None. None. In Compliance Station Records NoMaximum Gross Heat Input = 1.64 MMBTU/hr (HHV). Other: Fuel burner rated capacity[NJ.A.C. 7:27- None.U43 OS19 2 In.J.A.C.

7:27-22.16(a)] 22.16(a)]. I Compliance Station Records No

Hours of Operation o= 250 hr/yr. (N.J.A.C, 7:27- Hours of Operation: Monitored by hournitire monitor Hours of Operation: Recordkeeping by manual logging22.16(a)] continuously. based on one caeendar year The of parameter each month during operation. Thepermittee shall install. calibrate and maintain in permitete shall record in either a permanent bound logaccordance with the manufacturer's specifications. a book. or in readily accessible computer memories. dteU 43 OS 19 3 totalizing hour meter to monitor the total hours of monthly hours of operation of the generator and made In Compliance Station Records Nooperation per year for the generator. [N.J.A.C. 7:27- available to the representatlves of the Department of22.16(o)] Environmental Protection upon request for a period offive years .fafr the date of each record. IN.J.A.C. 7:27-

-22.16(o)]

U 43 OS19 4 CO -= 3 71 lblhr. IN J.A.C. 7:27-22.16(a)) None. In Compliance Station Records NoU 43 OS19 5 NOx (Total) = 6.79 lb/hr. [NJ.A.C 7:27-22t16(a)]e . sone. In Compliance Station Records NoU 43 OS19 6 PM-1O (Total) -= 0.21 hb/hr. [N.J.A.C. 7:27-22.16(a)) None. None. In Compliance Station Records NoU 43 OS19 7 S02 <- 0.14 lb/hr. (N.J.A.C. 7:27-22.16(a)1 No)e. None. In Compliance Station Records NoU 43 OS19 8 TSP = 0.21 Ibihr. [N.J AC. 7:27-22.16(a)] None. In Compliance Station Records NoU 43 OS19 9 VOC (Total) = 0.59 Itbhr. [N.J.A.C. 7:27-22.16(a)] None, None. In Compliance , Station Records NoVOC (Total) -= 0.21 tons/yr. Annual emission limit None. None.

U 44 OSO 1 based on operating permit application. [NJACC 7:27 In, Compliance Station Records No22.16(a)]

NOx (Total) = 0.503 tons/yr. Annual emission limit None. None.U 44 OSO 2 based on the total operating time of 500 hours/year.

In Compliance Station Records NoN.J.A.C. 7:27-22.16(e)]

CO -t 0,109 tonslyr. Annual emission limit based on None. None.U44 OS0 3 the total operating time of 500 hours/year. (N.J.A.C.

In Compliance Station Records No7:27-22.16(e)]

S02 - 0.033 tons/yr. Annual emission limit based on None. None.U 44 OS0 4 the total operating time of 500 hourslyear. [N.J.A.C.

to Compliance Station Records No7:27-22,16(e)] -TSP- 0=.036 tonslyr. Annual emission limit based on None. None.U 44 OS0 5 the total operating time of 500 hoursiyeao. (NJ.A C.

In Compliance Station Records No7:27-22.16(e)]

PM-10 (Total) = 0.036 tonstyr. Annual emission limit None. None.U 44 OSO 6 based on the total operating time of 500 hours/year.

In Comnpliance Staton Records No(N.J.A.C. 7:27-22.16(e))

Total Hours of Operation -= 500 hr/yr. Maimrum Total Hours of Operation: Monitored by hour/time Total Hours of Operation: Recordkeeping by manualannual operating hours based on preconstucton monitor continuously, based on one calendar year. logging of parameter each month during operation.permit, )N.J.A.C. 7:27-22.16(e)] The permittee shall install. calibrate and maintain in The peminitee shall record in either a permanent boundaccordance with the manufacturer's specifications. a log book, or in readily accessible computer memories.U 44 OS0 7 totalizing hour meter to monitor the total hours of the monthly hours of operation of the generator andoperation per year for the generator. NJAC. 7:27- made available to the representatives ofthe to Compliance Station Records No22,16(e) I. IN.J.A.C. 7:27-22.16(o)] Department of Environmental Protection upon requestfor a period of five years after the date of each recordN.J.A.C. 7:27-22.16(e) &. )N.J.A.C. 7:27-22.16(o))

The Emergency Generators as defined in N.J.A.C. None. Recordkeeping by manual logging of param•ter upon7:27-1. t cannot be used for load shaving. peaking occurrence of event The permittee shall record inpower production, or generation in an agreement with a either a permanent bound log book. or in readilyU 44 OSO .8 utility energy assistance program. (NJA.C 7:27- accessible computer memories, each occurrence of In Compliance Station Records No22.16(o)) start-up, date, duration of emergency generatoroperation and reason and the name of the personmakiog the entry. )N.J.A.C. 7:27-22.16(o)]

.f0190

Secti•n 6 ' star",

ype Cr'eek and rlec Geonerang SOtatiorn

Compliance Status Method to 1, a ComplianceRef # Applicable Requirement Monitoring Requirement Recordkeeptng Requirement (In COnpnario Dtermine Schedule Comments

Non-Conpliance) Compliance Attached? (YesfNeo)

Opacity 20 %. An emergency diesel generatorthat None. Noneis located at a facility that generates electricity fromnuclear power and that is subject to regulation by theNuclear Regulatory Commission is exempt hfom theprovisions of N.J.A.C. 7:27-3. However, this exceptionfrom the applicability of this subchapter srllat applyonly as follows:, During a test mandated by the Nuclear Regulatory

Commission: oriu Ouring a period when off-site supply of electricity isnot available due to causes outside the control of theowner or operator of the facility and operation of the

U 44 OS1 1 generatpr is needed for the protection of public health In Compliance Station Records Noor welfare.If these exemption periods do not apply, no personshall cause, suffer, allow or permit smoke greater thun20% opacity. exclusive of visible condensed watervapor, to be emitted into the outdoor air from thecomnbustion of feel ir this unit except for a period of notlonger than 10 consecutive seconds IN.J A C. 7:27-3.7(a)41

Particulate Emissions <- 1 .46 lb/hr. Particulate None. None.U 44 OSp 2 emission mirrit frorm the combustion of fuel based on In Compliance Station Records Norated teat input of source. [NJA.C. 7:27- 4.2(a)I

Sulflr Content in Fuel n- 0.3 % sulfur by weight. Sulfut Content ir Fuel: Monitored by review of fuel Sulfur Content in Fuel: Recorrkeeping by fuelMaximum allowable sulfur content in fuel oil by fuel delivery records per delivery. [NJ.A.C. 7:27-22.16(o)) certification receipts per delivery showing sulfurU 44 CST 3 typeloscosity and geographical zone (Salem County). content. [NJAC. 7:27-22.16(o)] In Compliance Station Records No[N.J.A.C, 7:27-.g.2(b)]VOC (Total) < 0.84 lb/hr. Maximum emission rate None, None.

U 44 OS1 4 from operatng permit application. [N.J.A.C. 7:27- In Compliance Station Records No22.16(a)]SNOx (Total) - 2.01 lb/hr. Maximum emission limit None. None.

U 44 OSI b based on preconstruction permit. [N.J.A.C. 7:27- In Compliance Station Records No22.16(e)]CO - 0.434 lbhr. Maximum emission rate from None. None.U 44 OSI 6 preconstruction permit, [N.J.AC 7:27-22.16(e)) In Compliance Station Records No

S02 c= 0.133 le/hr. Monimum emission limit based on Noe. Noone.U 44 OS1 7 the preoonstruction permit. [N.J.AC. 7:27-22.16(e)] In Compliance Station Records NoTSP n= 0,143 Ib/urr Maximum emission rate from None. None.Oddpreconscton pemit [NJA.C 7:27-22,16e)1 In Compliance Station Records No

PM-10 (Total) <- 0d143 lbjhr. Maximur,emission rate None. None.U 44 OSI 9 from preconstruction permit. [NJ A C. 7:27-22.16(e)] In Compliance Station Record. NoGenerator fuel limited to low sulfur distillate oil. Monitored by review of fuel delivery records per Recordkeeping by manual legging of parameter per

U 44d 051 10 N,J,AAC. 7:27-22,16(e)] delivery. Review bills of ladingtinvoices N.JkAC. delivery in a permanently bound logbook or redily In Compliance Station Records No7:27-22,16(o)) accessible computer memory [N.J A.C. 7:27-22 16(o)1

Maximum Gross Heat Input <- 2d41 MMBTU/hr (HHtV). Other: Fuel burrer rated capacity.(N.J A.C. 7:27- None.U 4 Si 11 Maximum gross heat input, based on the 22.16(e)), In Compliance Station Records Nopreconstruction permit (N.J.A.C. 7:27-22,16(e)(

VOC (fotal) - 00.13 tonslyr. Annual emission limit None. • None,U 45 0S0 I based on operating permit application. INJ.A.C. 7:27- lr Compliance Station Records No22.16(a)]

NOx (Total) 00503 tonslyr. Annual emission omit None. None.U 45 OSO 2 based on the total operating time of 000 hours/year. In Compliance Station Records No(N.J.AC. 7:27-22.16(e))

CO - 0.109 tons/yr. Annual emission limit based or None. None.U 45 OS0 3 tie total operalirrg time of 500 hours/year. [N.J.A.C. In Comrpliance Slation Records No7 :27-22.16(e)]

S02 -= 0.033 lonslyr. Annual emission limit based on None. None.040 OSO 4 the total operating time of 500 hours/year. IN J.A.C. In Compliance Sataien Records No7:27-22 I 6(e)t)

Page 56 .180

Section 6-.CompnlIiance StatusPSEli; Ni b-ar ItOL

Ilope Creek .rit Salem Ge3neating Stations

Complianco States Method to Is . ComplianceRef # Applicable Requirement Monitoring Requirement Recordkeerg Requirement (in Compilance Determine Scredtle CommentsNon-Compliance) Compliance Attached? (YisesNo)

TSP <= 0.036 tons/yr Annual emission limt based on None. None.U 45 OSO 5 the total operatrng time of 500 hours/year. [NJ.A.C.

In Compliance Station Records No7:27-22.16(e)]

PM-10 (Total) -= 0.036 tonstyr. Annual emission limit None. None,U 45 OSO 6 based on the total operating time of 500 hours/year.

In Compliance Station Records No[N.J.A.C. 7:27-22.t6(e)]

Total Hours of Operation <= 500 hr/yr. Maximum Total Hours of Operation: Monitored by hourttime Total Hours of Operation: Recordkeeping by manuatannual operating hours based on preconstructon monitor contiouously, based mr one calendar year. logging of parameter each month durirg operation.permit. [N.J.A.C. 7:27-22.16(e)l The permittee shall install, calibrate and maintain in The permittee shall record in either a permanent boundaccordance with the manufacturer's specihcations, a log book. or in readily accessible computer memories.U 45 OSO 7 totaliziog hour meter to monitor the total hours of the monthly hours of operation of the generator andoperation per year for the generator N.J.A.C. 7:27- made available to the representatives of the to Compliance Station Records No22.16(e) &. [N.J.A.C. 7:27-22.t16(o)] Department of Environmental Protection upon request

tor a period of five years after tre date of each recordN.J.A.C. 7:27-22.16(e) &. (N.J.A.C. 7:27-22.16'o))

The Emergency Generators as defined in N.J.A.C, None. Recordkeeping by manual togging of perameter upon727-19.1 cannot be used for load shaving, peaking occorrence of event The permittee shall record inpower production, or generation in an agreement with a either a permanent bound log book, or in readilyU 45 OSO 8 stilty energy assistance program. [N.JA C. 7T27- accessible computer memories, each occurrence of In Compliance Station Records No22.16(o)] start-up' date, duration of emergency generatoroperation and reason and the name of the personmaking the entry. (N.J.A.C. 7.27-22.16(o))

Opacity <- 20 %. An emergency diesel generator that None, None.is located at a facility that generates electricity fromnuclear power and that is subject to regulation by theNuclear Regulatory Commission is exempt from theprovisions of N.J.A.C, 7:27-3. However. this exceptionfrom the applicability of this subchapter shall applyonly as follows:

During a test mandated by the Nuclear RegulatoryCommission; orii, During a period when off-site supply of electricity isnot available due to causes outside the control of theowner or operator of the facility and operation of theU 45 iSt generator is needed for the protection of public health

In Compliance Station Records Noor welfare.If these exemption periods do not apply, no personshall cause, suffer, allow or permit smoke greater than20% opacity. exclusive of visible condensed watervapor, to be emitted into the outdoor air from thecombusiton of fuel in this unit except for a period of notlonger than 10 consecutive seconds. IN.J.A.C. 7:27-3.7(a)41

Particulate Emissions 0=0 . Ib/hr. Partioulate None. None.U 45 OS1 2 emission limit from the combustion of fuel based on In Compliance Station Records Norated heat input of souron. (N.J.A.C. 7:27- 4.2(a))

Sulfur Content in Fuel c 0.3 % sulfur by weight. Sulftr Content in Fuol: Monitored by review of fuel Sulfur Content in Fuel: Recordkeeping by fuelMaximum allowable sulfur content in fuel oil by fuel delivery records per delivery. [N.J.A.C. 7:27-22.16(o)] certification receipts per delivery showing saltfurU d5 COt 3 type/viscosity and geographical zone (Salem County). content. [N.J,A.C. 7:27-22.16(o)] In Compliance Station Records No[N.J.A.C. 7:27- 9.2(b))

VOC (Total) 00 053 lb/hr. Maximnum emission rate None. None.U 45 OS1 4 from operatihg permit application. (N.J.A.C. 7:27-

In Compliance Station Records No22.16(a))

NOx (Total) s= 2.01 lb/hr. Maximum emission limit None. None.U 46 OS1i based on preconstruction permit. [N.J.A.C. 0:27- In Compliance Station Records No22.16(e))

CO c- 0.434 Wbhir. Mardmum emission rate from None. None.Ud45 0S 1 6 preconstruction permit. [N J.A.C .2 7-2 7 In Compliance Station Records No

S02 -= 0.133 tb/hr. Maximum emission limit bosed on None. None.U 45 OS1 7 the preconstroction permit. [NJ A.C. 7:27-22.16(e)] In Compliance Station Records No

TSP = S0.143 lb/hr. Maximum emission rate from None. None.U45 1 i yrecenstruction permit. )N.J.A.C. 7:27-22.16(e)] In Compliance Station Records No

. too

SerforoI,- 0

ue talr,o

Ilope Creek a-id Sater Generatiog Prtaions

Compliance Status Metthodl to e aCemp0l-ceeRef# Applicable Requirement Monitoring Requirement Recbirdkueeplng Requirement lIn Compeleane Detiermin o Sichtd Comments

R enn:omplianel) Compliance Attached? (Yes/i)

PM-10 Total) -= 0.143 lb/hr. Maoimm em/ssion rae Noe None.U145 OSI 9' from precnstrucon pernit. [NJ A C. 7:27-22.16(e)[ In Compliance Station Records No

enenrator Mon/i/or/tao to lo ovftr d/stI/nteo//. Man/tored by reu of ouel del/very records per Recordkeeping by mranual logging o0 parameter per4[N1 JAC 727-22.16(e)) delivery. Review bills ofladingl/tvoices [N.JAC delivery in a permanently bound logbook or redily

U45 OSt 10 7:27-22.16(o)] accessible computer memory. [N JA.C. 7:27-22t161o)[ fl Compliance Stat/on Records No

Maximum Gross Heat Input - 1.5 MMBTU/hr [HHV). Other: Fuel burner rated capacity [N.J.A.C. 7:27- None.U 45 OSI 11 Maximum gmses heat input, based on the 22 16te)] In Compliance Station Records No

precooshtructn permit. [N.A.A.C. 7:27-22 161e)[

VOC (Total) <= 0,21 tonts/r Annual emission limit None. None.

U 46 OSO t based on operating permit application [N.J.AC. 7 27- In Compliance Stamion Records No22,16(a)[

NOx (Total) <= 05.03 tonslyr. Annual emission limin None NoneU 46 OS0 2 based on the total operating time of 500 hours/year, In Compliance "tMtion Records No

[N J AC 7:27-22,16(e)]CO 0 109 tons/yr Annual emission limit hosed on None. None,

U 46 OSO 3 the total npyrating time of 500 hourslyear [N AC. In Compliance Stat/on Records No7: 27-22.16(e)]S02 <= 0.033 tons/yr. Annual emission limit based on N•one. None.

U 46 OSO 4 the total operating time of 500 hburn/year. [N J.AG. In Compliance Station Records No7:27-22. 1__(e)_

TSP - 0.036 tons/yr. Annual emission limit based on None. None.U 46 D00 5 the total operating time of 500 hours/year. [N.J.AC In Compliance Station Records No

7:27-22,16[e)[

PM-10 (Total) ý= 0.036 tonsyr. Annual emission limit None. None.U 46 OSO 6 based on the total operating time of 5hO hours/year. In Compliance Station Records No

[NJA C. 7.27-22 16(e)[

Total Hours of Operation -= 500 hr/yr Maximum Total Hours of Operaton: Moni/ored by hour/time Total Hours of Operation: Recordkeeping by manualannual operatng hours based on preconstbuction monitor continuously. based on one calendar year. logging of parameter each month during operation.permit. [N JA.C. 7:27-2216[ne)[ The permittee shall install, calibrate and maintain in The permittee shall record in either a permanent bound

accordance with the manufacturers specifications, a log book, or in readily accessible computer memories.1146 000 totalizing hour meter to monitor thle total hours of the monthly hours of operation of the generator and

operation per year for the generator N.J.A.C. 7:27- 010de available to the representatives of the nt Compliance Station Records No22.16/e) &. [NJA.C. 7:27-22.16(o)[ Department of Environmental Protection upon request

for a period of five years after the date of each recordNJ A C. 7:27-22.16[e) & [NJA C. 7:27-22,16(o)]

The Emergency Generators as defined in N.J.A.C. None Recordkeeping by manual logging 01 parameter upon7:27-19.1 cannot be used for load shaving. peaking . occurrence of event. The permitee shall record inpower production, at generation in an agreemenlt with a either a permanent bound log book, or in readily

U 46 OS0 6 utility energy assistance program. [N.J.A.C. 7:27- accessible computer memories, each occurrence of In Compliance Station Records No22.16(o)[ . start-up date, duration of emergency generator

operation and reason and the name of the personmaking the entry. [NJA.C. 7:27-22.16([)[

Opacity = 20 %. An emergency diesel generator that None. None.is located at a facility that generates electricity fromnuclear power and that is subject to regulation by theNuclear Regulatory Commission is exempt from theprovisions of N.JAC 7:27-3. However, this exception -

from the applicability of this subchapter Snoai applyonly as ftulowsin During a test mandated by the Nuclear RegulatoryCommission; orii. During a period when off-site supply of electricity isnot available due to couses outside the control of theowner or operator of the facihity and operation Of the

U 46 OS1 I generator is needed for the protection of public health 1. Compliance Station Records No

or welfare.If these exemption periods do not apply, no personshall camuse, suffer, allow or permit smoke greater than20% opacity. exclusive of visible condensed wateruapor, to be emi/ted into the ou•door air from thecombustion of fuel in this unit except for a period of cot

longer than 10 consecutive seconds (N.J.A C. 7:27-3 7[a)4[

page 58 of 80

Section 6 - Compliance StaatsPSEC Nuolr t..C

I tape Creek and Salem Generating Stationrm

Campines Status Method to 1I Comp1an

Ref # Applicable Reaquirement Monitoring Requirement Recordkeapfng Requirement (In Cop"T"no Determine Schedule ComenrtsNoP - Suitnce Com..0Ic Attached? (Yes/No)ý

Particulate Emissions -= 1,446 tb/hr. Particolate None. NoneU 46 OS1 *2 emission limit from the combustion of fuel based on In Compliance Station Records Norated heat uof sorce. [N.J.AC. 727- 4.2(a)[

Suitor Content in Fuel - 0,3 % sulfur by Weight. Sulfur Content in Fuel: Monitored by review of fuel Sufuor Content in Fuel: Recordkeepirng by fuelMaximum allowable sulfur content in fuel oil by fuel delivery records per delivery [NJ A,C 7:27-22,16(o)] certibication receipts per delivery showing sulfurU 46 OS1 3 type/viscosity and geographical zone (Salem County), content [N J.A.C. 7:27-22.16(o)] In Compliance Station Records No[N J AC. 7:27- 9.2(b)[VOC (Total) -c 0.84 lb/hr. Maximum emission rate None. Noneý

U 46 OSI 4 from operating permit application [N J.A.Cý 7:27- In Compliance Station Records No22.16(a)]

NOx (Total) <- 2.01 Wbrhr. Maxinum emission limit None. None.U 46 OS1 5 based on preconstructiun permit. [N J.A.C. 7:27- In Compliance Station Records No22.16(e)]

ICO v 0.434 lblhr. Maximum emission rate from None' NoneU 46 OS1 6 preconstruction permit IN J.A.C. 7:27-22.16(e)[ In Compliance Station Records No

S02 -c 0,133 lb/hr. Maximum emission limit based on None None,U 46 OS1 7 the preconstruction permit. [N.J.A.C. 7:27-22.16(e)] tn Compliance Station Records No

TSP -c 0.143 lb/hr. Maximum emission rate from None. NoneU 46 OS1 8 reconstructian permit, [N,J.A.C. 7:27-22.16(e)] Irr Compliance Station Records No

6M-10 (Total) - 0.143 Ib/hr. Maximum emission rate None. NoneU 46 061 8 'from preconsoucthon permit [N J.A.C. 7:27-22.16(e)] In Compliance Station Records No

Generator fuel limited to low sulfur distillate oilt Monitored by review of fuel delivery records per Recordkeeping by manual logging of parameter perUd 001 10 [N.J.AC 7:27-22,16(e)] delivery. Review bills of tading/invoices [N.J.A.C delivery in a permanently bound logbook orredily7:27-22.16[o)] accessibte computer memory [N.J.A.C 7.27-22.16(o)] In Compliance Station Records No

Maximum Gross Heat Input <- 241 MMBTU/hr (HHV)[ Other: Fuel burner rated capacity [N.J.A.C. 727- None.U 46 OS1 it Maximum gross heat input, based on the 22.16(e)].

In Compliance Station Records Nopreconstruction permit. [N.J.A.C 7:27-22.16(e))jTSP -c 078 tons/yr. None. None.

U 47 0S0 1 Annual emission limit based on the total operating time to Compliance Station Records No

of 1800 hours/year combined for OS1 through OS 21.[N.J.A C. 7:27-22 16(a)]

IPM-10 (Total) -= 078 tons/yr. None. None.Annual emission lima based on the total operating time

U47 OSS 2 of 1800 honrs/year combined for OS6 through OS 21. It Compliance Station Records No[N.J.A C. 7:27-22 16(a)[

VOC (Total) n- 1.74 tons/yr. None. None.Annual emission limod based on the total operating timeU 47 OS0 3 of 1800 bhourslyear combined for OS through OS 21. In Compliance Station Records No[N.J.AC 727-22.16(a)]

NOx [Total) <= 20.08 tons/yr. None, None.U47 OSO 4 Annual emission limit based on the total operating time In Compliance Station Records Noof 1800 hours/year combined for OS1 through OS 21.

N J.A.C. 7:27-22.16(a)]

CO -= 10,88 tons/yr. None, NoneU47 060 Annuat emission limit based on the total operating time

In Compliance Station Records Noof t800 hours/year combined for OS1 through OS 21.N JJ.A C. 7:27-22.t6(a)]S02 - 0.73 tonsyr. None. None.U 47 OSO 6 Arrual emission limit based on the total operating timeof 1800 hours/year combined for OS1 through OS 21. In Compliance Station Records No[N,JA C. 7:27-22.16(a)[Total Hours of Operation -= 1,800 hrlyr total combined Total Hours of Operaton. Monitored by hour/time Total Hours of Operation: Recordkeeping by manualhours of operation for OS1 through OS 21. [N.J.A.C. monitor continuously, based on one calendar year logging of parameter or storing data in a computer data7:27-22.16(a)[ The permitee shall install. calibrate and maintain in system each week du4ng operation. The permatteeaccordance with the manufacturer's specifications. a shall record in either a permanent bound log pook, or

totalizing hour meter to monitor the total hours of in readily accessible computer memories, the monthlyU7 operation per year for the compressors. IN J AC, 7 27- hours of operation of the compressors and made In Compliance Station Records No22 16(a)] available to the representatives of the Department of

Environmental Protection upon request for a perod ofrive years after yhe date of each record. [N.J.A.C. 7 27-22.16(o)][

Sulfur Content in Fuel -= 0.3 % sulfur by weight, Sulfur Content in FPet: Monitored by review of fuel Sulfur Content in Fuel: Recordkeeping by fuelU47 A0 8 Apples to each compressor CST through OS 21. delivery records per delivery [N.J.AC. 7:27-22 16(o)] certifiation receipts per delivery showing sulfur In Compliance Station Records No[N.J.A.C. 7:27- 9 2(b)[

content [N.J.A.C. 7:27-22.t6(o)]

. r0o

I Crek and I Stirnen.rating Statn,,s

I • Compliance Status Method to Is a CeermplaneRef # Appticable Requirement Monitoring eequirement' recond-eepieg Requirement tn Coanrtan.e Dete-neme Schedote Comments

Nee-Compliance) Cemplience Attached? (Yeo/No)

The compressors shall have been manufactured prior None Recordkeepyng by manual logging of parameter orto April 1, 2006, and shall not have been modified or storing data in a compuder data system once initiallyreconstructed as per 40 CFR 60 14 and 40 CFtR and prior to permit renewal of certified copies of the60 15, after July 11,2005. date of manufacture of each of the compressors, theApplicabte to OS4 through OS21 IN JAC. 7 27- manfactuirer's specification of each of the22 16(a)] compressors With the sedal number, the make. the

model, the capacity. the emission limits of pollutantsU 47 OS 9from the compressors. the date when brought on site

and the date removed from site, and the dae In Compliance Station Records Norodification or reconstruction of the compressors.

Cerification should be as per N.J.AC 7:27-1:39.

All records should be kept on site for a minimum of 5years from the date of record and made available tothe representatives of the Department and LISEPAupon request [N.J.A.C..7:27-22 16(o)]

CoipTessov fuel limbed to tow suiftr distillate oil Monitored by review of fuel delivery records per Recordheeping by manual logging of parameter per

47 ODD Applicable to OS1 through OS21 [N JAC. 7,27- delivery. Review bills of ladinglinvoices [N.J.A C. delivery in permanently bound logbook or readily22.16(a)l 7:27-22.16(o)] accessible computer memory. INJA.C. 7:27-22.16(o)] In Compliance Station Recods No

Opacity<=20% Visible emissions from compressors Opacity: Monitored by visual determination each Opacity: Recordkeeping by manual logging ofno greater than 201% opacity, exclusive of visible month during operation, based on an instantaneous parameter each month during operation (in acondensed water vapor, except for a period of not determination. For compliance with the opacity permanently bound logbook or other electronic dataionger than 10 consecutive seconds, Applicable to standard, the permiftee shall conduct visual opacity management system) and retain the following records:0S1 through OS21 [NJ A.C 7:27- 3 51 inspections during daylight hours. Virual inspections (1) Date and time of inspection:

shall consist of a visual survey to identify if the stack (2) Emission point number:has visible emissions, exclusive of visible condensed (3) Operational status of the equipment;water vapor, to be greater than prescribed standard If (4) Observed results and conclusions:visible emissions are observed, the permitee shall do (5) Description of corrective action taken 4f needed;

the following: (1) Date and time opacity problem was solved, if(.1) Verify that the equipment andlor contrnl device applicable:causingicontoollieg the emission is operating according (71) J A C, 7 27B-2 results if conducted; andt47 OS0 o manufacturer's specifications and the operating 8) Name of person(s) conducting inspection. [N.J.A.C. to Compliaice Station Records Nopermit compliance plan If the equipment or control 7:27-22.16(o)]device is not operating properly, the permittee shalltake corrective action immediately to eliminate theexcess emissions. The permittee must report anypermit violations to NJDEP pursuant to N.J.A.C. 7:27-22.19,

12) If tOe corrective action taken in step (1) does notcorrect tle opacity problem within 24 hours, theapplicant shall perform a check via a cerified opacityreader, in accordance with N.J.A.C 7:276-2. Such test

shall he conducted each day until corrective action istaken to successfully correct the opacity problem.

ýNJ.A.C. 7:27-22t16bo)l,

Particulate Emissions <c 1.68 Ibthr Particulate . None. None.U 47 OS1 1 emission limit from the combustion of fuel based on Ifr Compliance Station Records No

rtoed heatiepat of source. JN.J.A.C. 7.27- d.2(o)lU 47 001 2 VOC (Tot10) v= 0.98 ihthr. Maximum emission rate None. None.

from pruconstruchon permit. [N.J A.C. 7:27-22.16(e)] In Compliance Station Records No

NOx (Total) -= 12.4 hbthr. Maximum emission limit None. None

047 001 3 based on preconstruction permit. [NJ.A C. 7:27- In Compliance Station Records No

CO v= 2.06 Ib/fo. Manimum emission rate from None, None.

pruconstruction permit. [N.J.A.C. 7:27-22.16(e) -o

0S2 v= 0.81 Iblir. Maximum emission limit based on None. None.

[U 47 D6 t 6 IGlv.6bN.MxmmI

Compliance Station Records NoU 47 OS1 5 :the prueonstroction permit. [N.J.A.C. 7:27-22.16(e)]l opiac ttonRcrs N

tSp 00 0 87 lb/hr Maximum emission rate from None. None

0 47 OS1 6 preconstruction pernrit, [NJAC. 7:27-22.16(e)( In Compliance Station Records No

I . M-1D I{otoal) - 087 fbohr. Maximum emission rate None None.047 OSt 7 Item preucnstruction permit. IN JA.C. 7:27-22.16(e)] In Compliance Station Records No

Maximum Gross Heat Input -= 2.8 MMBtUllrr IHNIV). Other. Fuel burner rated capacity [N.J A C 7:27- None.

4 47 OS1 6 Maximum gross heat input, based on preconstruction 22t16(e)(. In Compliance Station Records NoPermit. NJA.C. 7:27-22 tE(e)l -:

Page 60 of 80

Section 6- Coorpliance StatusPSE/G Nulear II,C

I lope Croek oaid Sahem Grnerating Shati

Compliance Status Mthod to no a complianrceApplicable Requirement [ - Recordkeepllig Requirement IlI Compliance Detenrine Schedule Comments

Non-Coinphlano) Corspllenoe Attached? (YesiNo)

Start-up shah he defied as the period from eginning None None.of fuel ignition until the flame of the burner reachesstabilization. The duration of the exemption from theemissions limits specified in this permit shall notexceed 30 consecutive minutes,

Ctian Station Records0 47 OSt 9 Please note that the above exemption does not apply tn ompan No

to the RACT emission limits described in N.J.A C. 7:27.IN.JA C. 7:27-22.16(e)]

Shutdown shall be defined as the beginning of fuel None. None.reduction unfil the total shutdown of fuel to the boiler.The duration of the exemption from emission limitsspecified in, this permit shall not exceed 30 consecutiveminutes.

U47- 0S0 10 Please note that the above exemption does not apply In Compliance Station Records No

to the PACT emission limits described in N.J.A&C7:27. [NIJAC 7:27-22.16(e)]

Particulate Emissions - 1.68 Ib/hi. Particulate None. None.U 47 0S2 1 omission limit from the combustion of fuel based on

In Compliance Station Records Norated heat input of source. [N.J.A C. 7:27- 4.2(a)]VOC (Total) <- 0.98 Ib/hr. Maximum emission rate None. None.0 47 OS2 2 from preconstruction permit. [N.J A.C. 7:27-22.16(6)1

In Compliance Station Records NoNOx (Total) -O 124 lb/hr. Maximum emission limit None. NoneU 47 US2 3 based on preconstruction permit. [N.J.A.C. 7:27-

In Compliance Station Records No22.l6(e)t!

CO = 2.66 Iblhr. Maximum emission rate from None. None.U 47 OS2 4- preconstruction permit. [N J.A.C. 7:27-22.16(e)[ In Compliance Station Records No

S02 -= 0.81 lb/hr. Maximum emission limit based on None. None.U 47 OS2 5 the preconstruction permit. [N J.A.C. 7:27-22.16(e)] In Compliance Station Records No

TSP <- 0,87 hb/hr, Maximum emission rate from None. None,0 47 0S2 6 preconstruction permit. (N.JA.C 7;27-22.16(e)) In Compliance Station Records NoPM-10 (Total) = 0 87 lh/hr. Maximum emission rate None. None.

0 47 CtS2 7 from preconstruction permit. [N.JA.C. 7:27-22.16(e)j In Compliance Station Records NoMaximum Gross Heat Input = 2,8 MMBTU/hr (HHV),I Other: Fuel burner rated copacitpy[NJ.A.C. 7:27- None.

0 47 OS2 8 Maximum gross heat input, based on preconstruction 22.16(e)], In Compliance Station Records No'permit. [N. J,A,C. 7:27-22 [ 16(e)]

Start-up shall be defined as the period from begisning None Noneof fuel ignition until the flame of the burner reachesstabilization. The duration of the exemption from theemissions limits specified in this permit shall notexceed 30 consecutive minutes.

U 47 OS2 9 Please note that the above exemption does not apply Is Compliance Station Records Noto the RACT emission limits described in N.J.A C,

7:27 [N J.AC 7:27-22,16(e))

Shutdown shall be defined as the beginning of fuel None None.reduction until the total shutdown of fuel to the boiler,The duration of the exemption from emission limitsspecified in this permit shall not exceed 30 consecutiveminutes.

U 47 OS2 10 Please note that the above exemption does not apply In Compliance Station Records Noto the PACT emission limits described in NJ.A C.

7:27. [N J.A.C 7:27-22.16(e)]

TSP -= 1.68 Ib/hr. Particulate emission limit from the None. None.0 47 OS3 1 combustion of fuel based on rated heat input of source.

In Compliance Station Records No[N,J.A.C 7:27- 4,2(a)] \

U 47. OS3 2 VOC (Total) = 0998 Ilbhr [N.J.A.C 7:27-22.16(a)) None. None. In Compliance Station Recordsr No0 47 OS3 3 NOx (Total) - 12.4 tb/hr. [N.J.A.C. 7,27-22,16(a)] None. None, In Compliance Station Records No047 OS3 4 CO v= 2.66 lb/hr. [N.J.A.C. 7:27-22.16(a)) None. None. In Compliance Station Records NoU 47 OS3 5 S02 = 0.81 lb/hr. [N.J.A,C. 7:27-22.16(a)) None. None, In Compliance Station Records No

. f180

Sectrint, - * ce St.t...S

I trrpn Creek orrd S•rert Genrarrtirg Shrtiuon

Compliance Status Method to 1. Corp lI.n-Ref # Applicable Requirement Monitoring Requirement Reco-dikeeptng Requirement (in Compliance Deteroine Schedule CommentsNon-Compliaenc) Compliance Attahed? (YfefNO)

U 47 OS3 6 TSP 0.87 lb/hr. [NJA.C. 7:27-22.16(a)) None. None. In Compliance Station Records NoU 47 OS3 7 PM-10 (Total) - 0.87 Ib/hr. [N.J.A.C. 7:27-22.16(a)l None. None. In Compliance Station Records NoMaximum Gross Heat Input = 2,8 MMBTU/hr (HHV). Other: Fuel burner tated capacify [N.J:AC. 7:27- None.U 47 OS3 [N.J AC. 7:27-22 16(a)] 22.16(a)]. In Compoiance Station Records No

Start-up shall be defined as the period from beginning None, None.of fuel ignition until the flame of the burner reachesstabilization. The duration of the exemption from theemissions limits specified in thin permit shall note7xceed 30 consecutive minutes.

U 47 0S3 9 'oease note thot the above exemption does rot opply In Compliance Station Records Noto the RACT emission limits described in N.J A C7:27. [N.J.AC. 7:27-22.16te)]

Shutdown shall be defined as the beginning of fuel None. Nonereduction until the totao shutdown of foel to the boiler.The duration of the exemption from emission limitsspecified in this permit shtll not exceed 30 consecutiveminutes.

U 47 S3 Please note that the above exemption does not apply In Compliance Station Records Noto the RACT emission limits described in N.J.A.C.7:27. INJ.A.C. 7:27-22.16(e)]

1 TSPf n 0.7 lb/hr. Applies to each compressor (OS4 - None. None.U 47 OS4 1 OS2ff [NJ.AC. 7:27.4 2(a)] In Compliance Station Records No

Maximum Gross Heat Input - 5.4 MMBTU/hr (HHV). Other Fuel burner rated capacitylN J.AC. 7.27- None.U 47 OS4 2 Applies to each compressor [OS - OS21)t [N.J A.C. 22.t6(a)t. to Comptiance Station Records No7:27-22.16(a)o

CO - 12.09 lb/hr applies to each compressor (OS4 - None. None.U 47 OS4 3 to21)

INJ.AýCý 7:27-2216(a)l In Compliance Station Records No

NOx (Total) <= 22.31 tlbhr applies to each compressor None. None.U 47 OS4 4 [OS4 -OS2ff. [NJA C. 7:27-22.16(a)] In Compliance Station Records No

PM-i 0 (Total) - 0 7 tb/hr applies to each compressor None. None.U 47 OS4 5 (004 - OS21). [N.J.A.C. 7:27-22.1o6(a)] In Compliance Station Records No002 0=0.47 tb/hr applies to each compressor (OS4 - None. None.U 47 OS4 6 0S2t). [N.JAC. 7:27-22.f6(off

In Compliance Station Records NoTSP <= 0.7 lb/hr applies to each compressor (OS4 N None. None.U 47 004 00D2ff. [N.J.A.C 7:27-22.16) Sf ffInt Comptionce Stotron Records No

- VOC (Total) -n 1.94 tb/hr applies to each compressor Noone. None.U 47 OS4 8 {OS4 - OS21). [N.JA.C.G727-22.16(e)]

In Compliance Station Records NoTSP -0 0.7 lb/hr. Applies to each compressor (OS4 - None. None.

U 47 OS5 1 00S21) [NIJ.A C. 7:27- 4.2(a)] In Compliance Station Records No

Maximum Gross Heat Input - 5.4 MMBTU/hr (HHV). Other: Fuel burner rated capacity[N.J.A.C. 7:27- None.U 47 OS5 2 Applies to each compressor (0S4 - OS21). [N.J.A.C. 22.16(a)]. In Compliance Station Records No7:27-22.16(a)l

CO -= 12,09 lb/hr applies to each compressor (OS4 - None. None.U47 OS5 3 OS2t), [N.JoA.C 7:27-22.16M] In Compliance Station Records No

NOx (Tftal) -= 22.31fIbhr applies to each compressor None. None,U 47 OS5 4 (OS4 - OS21) [N JAGC 7:27-22.16(a)] In Compliance Station Records No

PM-tO (Total) -= 0 7 Ib/hr applies to each compressor None. None.U47 OS5 5 (OS4- OS

21). [N.J.A C. 7:27-22.t1a6(a)]

In Compliance Station Records NoS02 = 0.47 Ib/hr applies to each compressor (OS4 - None. None.U 47 005 6 OS21). [N.J.A.C. 7:27-22.16(a)]

I Compliance Station Records NoTSP -= 0.7 lb/rr applies to each compressor [OS4 - None. None

U 47 OS5 7 OS21). [N.JAC 7:27-22.16(a)] In Complionce Station Records No

VOC (Totel) <= f 94 lb/hr applies to each compressor None. NoneU 47 OS5 8 OS4T-OSa21)5[NJA.C 7t27-22o16(a)] In Compliance Station Records No

TSP 0 0.7 lb/hr. Applies to each comrpressor fOS4 - None. None.U 47 008 1 0S21). [N.J.A C. 7:27- 4.2(a)] In Cormpliance Station Records No

Miaimum Gross Heat Input - 5.4 MMSTU/hr (HHV). Other: Fuel burner rated capacily[N.J.A.C. 7:27- None.U 47 006 2 Applies to each compressor (OS4 - OS21) (N.J.A.C. 22.16(a)f. In Compliance Station Records No7:27-22.16(a)]

Page 62 of SO

Section 6 - Compliance StabtsPSMG N-cl-ar I1C

I ltop Crrock nod hlmlm Geerating Staties

Compliance Status Method to Is a COrmplianceRef #pplicabie Requirement I Monitoring Requirement Recordkeeping Requirement (in Compliance Detenrmie Schedule CommentsNon-Coarpliance) Compliance Attached? (YeslNo)

CO o12.09 lbhr applies to each compressor (OS4 - None. NIone.047 OS6 3 S21). JNJ A.C. 7:27-22.16(a)] In Compliance Station Records NoU 7 O S O x (T otal)< = 22 .3 1 Ibth r app lies to e ach co m pressor N one . •,one. I o p i n e S a i n R c r sN

47 OS6 ' OS4 - OS21). [N.J.A.C. 7:27-22.16(a)] _n Copliace SationRecods N

PM-10 (Total) = 0 7 lb/hr applies to each compressor None. None.U 47 OSO 5 rOS4 - OS21). [N J.AC. 7:27-22.16(a)) In Compliance Station Records NO

S02 .0.47 lb/ht applies to each compressor (OS4- None. NoneU47 OS6 6 OS21). [N JAC 7:27-22.16(a)) In Compliance Station Records NoTSP -= 0,7 lb/hr applies to each compressor (OS4 - None. None.47 OS6 7 S21).Compliae

Stion Records NoVOC (Total) -= 1.94 Ilb/hr applies to each compressor None. None.047 0S6 8 lOS4 - OS21). [N.J.AC. 7:27-22.16(a))

In Compiance Station Records NoTSP - 0.7 1lbhr. Applies to each compressor (OS4 - None. None.047 0S7 1 0S21), [N J.A.C. 7:27- 4.2(a)]

In Compliance Station Records NoMaximum Gross Heat Input -= 5.4 MM8TU/hr (HHV). Other: Fuel burner rated capacty(N.JA.C. 7:27- None.

U 47 OS7 2 Applies to each compressor (OS4 - OS21). [NJ.A.C. 22.16(a)]. In Compliance Station Records No7.27-22 16(a)]

CO -= 12.09 lb/hr applies to each compressor (OS4 - None. None.U 47 OS7 3 OS21). [N.J.A C 7:27 22,16(a)) In Compliance Station Records No

NOx (Total) -= 22.31 lb/hr applies to each compressor None, None.U 47 OS7 4 (OS4 - 0S21). [NJ.A.C. 7:27-22.16ta)] In Compliance Station Records No

PM-10 (Total) -= 0.7 lbthr applies to each compressor None. None. In Compliance Station Records No047 OS7 5 . (OS4 - OS21) N.J.A.C. 7:27-22.16(a)]

S02 -= 0.47 lb/hr applies to each compressor (OS4 - None. None.S 007 6 05$21), [NJA.C, 7:27-22.16(a)) In Compliance Station Records No

IUSP <= 0.7 lb/hr applies to each compressor (OS4 - None. None.047 OS7 7 0S21). [N.JA C. 7:27-22,16(a)t In Compliance Station Records No

VOC (Total) -= 1.94 lb/hr applies to each compressor None. None.047 OS7 • 8 1(04 - 0S21). [NJA.C. 7 27-22,16(a)] In Compliance Station Records NoTSP c= 0.7 lb/hr. Applies to each compressor (OS4- None. None. In Compliance Station Records No047 008 00S21). [N.J.A.C. 7:27- 4.2(a)) In Compliance Station Records NoMaximum Gross Heat Input -= 5.4 MMBTU/hr (HHV). Other: Fuel burner rated copacily[N.J.A.C. 7:27- None.

U 47 OS8 2 Applies to each compressor (OS4 - OS21). [N.J.A.C. 22.16(a)]. In Compliance Station Records No7:27-22.16(a)]

CO c= 12,00 lb/hr applies to each compressor (OS4 - None None.047 00 3 0S21) [NJA.C 7:27-22.16(a)] In Compliance Station Records No

NOx (Total) c 22.31 lb/hr applies to each compressor None. None.047 OS8 4 (OS4 - OS21). [N.J.AC. 7:27-22,16(a)] In Compliance Station Records No

PM-10 (Total) -= 0.7 lb/hr applies to each compressor None. None.047 OS8 5 (OS4 - OS21). )N.J.A.C. 7:27-22.16(a)) In Compliance Station Records No

002 1 = 0.47 lb/hr applies /o each compressor (OS4- None. None.047 008 9 OS21). )N.J.A.C. 7:27-22.16(a)] In Compliance Station Records No

TSP c- 0.7 lb/hr applies to each compressor (OS4- None. None.047 OS8 7 0021). [N J A.C. 7:27-22.16(a)] In Compliance Station Records No

VOC (Total) -= 1.94 lb/hr applies to each compressor None. None.047 OS8 8 IOS4 - OS21. )N.J.A.C. 7:27-22.16(a)] In Compliance Station Records No

TSP -= 0.7 lb/hr, Applies to each compressor (OS4- None. None.047 009 1 0S21). [N.J.A.C. 7:27- 4,2(a)) In Compliance Station Records No

maximum Gross Heat Input <= 5.4 MMBTU/hr (HHV). Other: Fuel burner rated capacity[N.J.A C. 7:27- None.U 47 OS9 2 Applies to each compressor (OS4 - OS21). [NJA.C. 22.16(a)].

In Compliance Station Records No7:27-22.16(a))

CO -= 12.09 lb/hr applies to each compressor (OS4 - None. None.047 OS9 3 0021). [N.J.A.C. 7:27-22.16(a)) In Compliance Station Records No

NOx (Total) -c 22.31 Ib/hr applies to each compressor Noone. None.047 OS9 4 (OS4 - OS21). [N.J.A.C. 7:27-22.16(a)] In Compliance Station Records No

PM-10 (Total) - 0 7 1b/hr applies to each compressor. None. None.47 09 5 (S4 - OS21). [N.JA.C. 7:27-22.16(a)] In Compliance Station Records No

S02 c= 047 lb/hr applies to each compressor (OS4 - None. None.47 OS9 6 0021) ),N.J.A.C. 7:27-22.16(a)) In Compliance Station Records No

. too

0 ScCtionf- 'ce sar,.

I I'Tru Cr •k and &,Iý Genr.-oing Sta liu.,

Compliance Status Method to IS a ComplianneRef # Applicable Requirement Monitoring Requirement Recordkeeplng Requirement (in Counpflanc Dertarmint, Schedule CommentsNlon-Cormpltance) Compliance Attached? (YcisINo)

TSP -= 0.7 Ib/hr applies to each compressor (OS4 - None. None,U 47 OS21) [N.J A.C 7:27-22.16(a)!

In Compliance Station Records NoVOC (Total) - 1.94 Iblhr applies to each compressor None. None.U 47 OS9 8 OS4 - OS21). (N.J.A C. 7:27-22,16(a))

In Compliance Station Records NoTSP -= 0.7 bIbhr, Applies to each compressor (OS4 - None. None.U 47 OS10 I 0S21). [NJ.A C. 7:27- 4.2(a)l

In Compliance Station Records NoMaaximum Gross Heat Input -= 5.4 MMUTU/hr (HHV). Other: Fuel burner rated capacity[N J.A.C. 7:27- None.

U 47 Oslo 2 Applies to each compressor (OS4 - 0S21). [NJA C, 22.16(a)). In Compliance Station Records No7.27-22.16(a)]

CO -= 1209 Wbahr applies to each compressor (OS4 - None. None.U 47 OSlO 3 0S2t() [N.J.A C. 7:27-22.16(a)] In Compliance Station Records No

NOx (Total) -= 22.31 WC/hr applies to each compressor None. None.U 47 OS10 4 (OS4 - OS21). [N.J A.C. 7:27-2216(aIn Compliance Station Record No

PM-1S (Total) -= 0.7 lhthr applies to each compressor None. None,U 47 OSlO In Compliance Station Records No

6 S02 no= 0 47 lbfhr applies to each compressor (OS4 - None. NoneU 47 OS10 6 OS2t(. )N.J.A.C. 7:27-22.16(a)] In Compliance Station Records No

TSP <= 07 1bthr applies to each compressor (OS4 - None. NoneIU 47 OSt0 7 tot)

NJ .72-2.6a]I Compliance Station Records No052t( N.JTA C, 7:27-22.16(a))

VOC (Total) -= 1 94 161hr applies to each compressor None, one.U47 OS (S4 - OS21 [NJA C. 727-226(a)] In Compliance Station Records No

TSP - 0 7 lb/hr. Applies to each compressor (OS4 -. None NoneU 47 OS11 1 OS21). [N J.A.C. 7.27- 4.2(a)) In Compliance Station Records No

Maximum Gross Heat Input -n 5.4 MM6TUfhr (HHV). Other. Fuel burner rated capacrty)N.JA.C. 7.27- NoneU 47 OS11 2 Applies to eachcompressor (OS4 - OS2t). [N.J A.C. 22.16(a)], In Compliance Station Records No7:27-22.t6(a)]

CO 0= 12.09 1tlhr applies to each compressor (OS4 - None. None,U 47 OS11 3 0621). [N.J.A.C, 7:27-22.16(a))

In Compliance Station Records NoNOn (Total) = 22.31 lbthr applies to each compressor None. None.U 47 OSt1 4 'OS4 - 0S21) IN.A.A.C. 727-22.16(a)]

In Compliance Station Records NoPM-i0 (Total) -= 0.7 1b1hr applies to each compressor None. None.U 47 OS1 5

IOS4 Compliance S-ation Records No0S2 = 0.47 1b/hr applies to each compressor (OS4 - None, None.U 47 OStr 6 0S.).[ A .7272. (. Is Coer~plianco Station Records No0S21). (N.J.A C. 7:27-22.16(a)]

TSP n- 0.7 1b/hr applies to each compressor (OS4 - None. None.U 47 OStt 7 0S21) [N.J.AC, 7:27-22.16(a)] In Compliance Station Records No

VOC (Total) -= 1.94 1b/hr applies to each compressor. None. None.U47 OS11 8 (OS4 - OS21). [N.J.A.C. 7:27-22.16(a)]No

tSP <= 0,7 61ohr. Applies to each compressor (OS4 - None. None.U 47 6rS12 1 OS21). )N.J.A.C. 7:27- 4,2(a)] In Compliance Station Records No

Maximum Gross Heat Input .5 4 MMBTUIhr (HHV). Other. Fuel burner rated capacity[N.JA.C. 7:27- None.U 47 OS12 2 Applies to each compressor (OS4 - OS21) [N J A C. 22.16(a)]. In Compliance Station Records No7:27-22 16(a)]

CO -= 12.09 0bhr applies to each compressor (0S4 - None. NoneU 47 OS12 3 OS21). [N J.AC, 7:27-22.160a)) In Compliance Station Records No

NOx (Total) - 22.311 b/hr applies to each compressor None. None.U 47 OS12 4 (OS4 - 0S21). )N.J.A.C. 7:27-22.16(a)]

In Compliance Station Records NoPM-1O (Total) n- 07 1b/Cr applies to each compressor None NoneU 47 OS12 5 (OS4 0621). )N.J.A.C. 7:27-22.16(a)) . In Compliance Station Records No602 -= 0.47 lb/hlr applies to each compressor (OS4 - None. None.U 47 0612 6 3S1 NJAC :72.0a] "In Compliance Station! Records NoU 47 S12 0621). JN.JA.C. 7:27.22.t6(a()

4 TSP - 0.7 Whir applies to each compressor (OS4 - None. None.U 7 012 S021). )N.J.A.C. 7:27-22.t6ral) Is Compliance Statiorr Records No

VOC (Total) -= 1.94 Iblhr applies to each compressor None. None

r U 47 0 61 2 7 ( 4 -S2 1 ) . )N.J .A .C 7 :2 7 -2 2 .1 6 ( a ) ) In C o m p lia n c e S ta tio n R e c o rd % N o* 47 OS12 8 (OS4 -OS21), [N,J,AC 7.27-22.16(a)) In Compliance Station Records No

ISP -0 0U7 1br, Applies to each compressor ,OS4 - None. None.U 47 OS13 1 0S21). [N.J.A.C. 7:27- 4.2(a)) In Compliance Station Records No

Maximum Gross Heat Input -0 54 MME)TUIbr (HHV). Other: Fuel burner rated capacily)N.J.A.C. 7:27- None.U47 Os13 2 Applies to each compressor (0S4 - OS2 [) (N.J A.C. 22.16(a)). In Compliance Station Records No7:27-22.16(a)]

P6 4 r4 of 80

Section 6 - Compliance StatusPSNE Ncicar It,,C

[tope Cr-1k and Sal-, Cenerating Stations

• . Compliance Status Method to Is a ComplianceRat I Applicable Requirement Monitortng Reeuirement RecordikeepIng Requirement (In Compllance Determine Schneedule CommentsNon-Compliance) Compliance Attached? (YesiNo)

CO b09 Wir app ies to each compressor (0S4 - None. None.047 OS13 3 OS21)( [N.J.A.C. 7:27-22,16(a)]

In Compliance Station Records NoNOx (Total) -= 22.31 Ib/hr applies to each compressor None. None.

NoU47 0S131 4 (OS4 - OS21). [N.JA.C. 7:27-22.16(a)] In Compliance Station ReordsPM-10 (Total) <- 0.7 1b0hr applies to each compressor None. None.U047 OS13 5 (OS40- 21). [NJAC. 7:27-22,16(a)) In Compliance Station Records No -

S02 = 0.47 lb/hr applies to each compressor (OS4 - None. None.U 47 OS13 6 OS21).[NJ.A.C. 72-22.16(a)] In Compliance Station Records NoTSP = 0,7 lb/hr applies to each compressor (OS4 - None. None.U047 OS13 7 0S21) )N.J.A.C, 7:27-22.16(a)] In Compliance Station Records NO

VOC (Total) -= 1.94 Ib/hr applies to each compressor None. one.U 47 OS13 8 (OS4-OS21). 2NJA.C. 7:27-22.168a)} In Compliance Station Records No

TSP = 0.7 lb/hr. Applies to each compressor (OS4 - None. None.U 47 OS14 1 OS21), [N.J.A.C. 7:27- 4.2(a)) In Compliance Station Records No

Maximum Gross Heat Input < 5.4 MMSTU/hr (HHV). Other: Fuel burner rated capacity[N.J.A.C. 7:27- None.U 47 0S14 2 Applies to each compressor (OS4 - OS21). (N.J.A.C. 22.16(a)].

In Compliance Station Records No7:27-22 16(a)]

CO = 12.09 lb/hr applies to each compressor (OS4 - None. None.U 47 0014 OS21). [N.J.A.C. 7:27-22 16(a)) In Compliance Station Records No

NOx (Total)-=22.31 lb/hr applies to each compressor None. NoneU 47 OS14 4 (OS4- OS21). [N.JAC, 7 27-22,16(a)] In Compliance Station Records No

PM-10 (Total) <0 07 Ib/hr applies to each compressor None. None•047 0014 5 (4OS - OS21). [N.J.A.C. 7:27-22.16(a)] In Complince Station Records No

S02 = 0.47 lb/hr applies to each compressor (OS4 - None. None.047 OS14 6 OS21), JN.JA.C. 7:27-22.16(a)] In Compliance Station Records No

TSP = 0.7 Ib/hr applies to each compressor (OS4 - None. None.U 47 OS14 7 OS21). [N.J.A.C, 7:27-22,16(a)] In Compliance Station Records No

VOC (Total) - 1.94 tb/hr applies to each compressor None. None.U 47 OS14 8 (os4 - 0S21). [N.J.A,C. 7:27-22,16(a)] In Compliance Station Records NotSP <= 0.7 lb/hr. Applies to each compressor (OS4 - None. None.

U47 OS1 .1 0S21). (N.J.A.C. 7:27- 4.2(a)) In Compliance Station Records No

Maximum Gross Heat Input = 5.4 MMBTU/hr (HHV). Other: Fuel burner rated capacity[N.J.A.C. 7:27- NoneU 47 OS15 2 Applies to each compressor (OS4 - OS21). N.J A.C. 22.16()]).

In Compliance Station Records No7:27-22.16(a)]

CO 0- 12.09 lb/hr applies to each compressor (OS4 - None, None.U 47 OS15 3 OS21), [NJ.A C. 7:27-22,16(a)] In Compliance Station Records NoNOx (Total) -=22.31 lb/pr applies to each compressor None. None.0 47 0015 4 (OS4 -0S21). [N.J.A.C. 7:27-22.16(a)] In Compliance Stan Records NoPM-10 (Total) -= 0.7 1b/(r applies to each compressor None. None.047 OS1O 5 (OS4 -0S21). [N.J.A.C. 7:27-22,16(a)] In Compliance Station Records No

S02 = 0.47 tb/rh applies to each compressor (OS4 - None. None.U 47 0510 6 OS21). [N.J.A.C. 7:27-22.16(a)) In Compliance Station Records No

TSP n= 0.7 lb/hr applies to each compressor (OS4 - None. None.U 47 OS15 7 OS21) [N.J.AC. 7:27-22.16(a)] In Compliance Station Records No

VOC (Total) -= 1.94 lb/hI applies to each compressor None. None.0 47 0015 89 S S1,[.. .72-21() In Compliance Station Records No(004 - 0021). (N.I.A.C. 7:27-22,16()])

4TSP - 0,7 lb/hr. Applies to each compressor (OS4 - None. None.0 47 OSI6 1 '02) NJA.72-42a]In Compliance Station Records No

Maximum Gross Heat Input -= 54 MMBTU/hr (HHV). Other: Fuel burner rated capacity[N.J.A.C. 7:27- None.U 47 OS16 2 Applies to each compressor (OS4 - OS21). (N.J.A.C. 22,16(a)].

In Compliance Station Records No7:27-22,16(a)]

CO0= 12.09 lb/hr applies to each compressor (OS4 - None. NoneU 47 OS16 3 0S21). (N.J.A.C. 7:27-22.16(a)] In Compliance Station Records No

NOx (Total) -= 22.31 lb/Irr applies to each compressor None. None.U 47 OS16 4 (OS4-OS21). (N.J.A.C 7:27-22,15(a)] In Compliance Station Records No

PM- 10 Total) no 0 7 Ib/hr applies to each compressor None None,U47 0016 5 (OS4 - OS21). INJAC. 7:27-22.16(a)] In Compliance Station Records No

0S2 <- 0.47 Ib/hr applies to each compressor (0S4 - None. None.47 16 6 OS21).In Compliane Staion Reords No

0 . 0n-

Sto- cton6 St SW"atos tinsr

GCerpIioeOOStoton Method to t' oo rnplonORtef 8 Applicable Requirement Monitoring Requirement Recordkeeping Requirement (In Compliance Deteene Sohedole Comment.fNon-Complianoe) Compliance Attached? (YeolNt1

TS 071 bhr applis to eah compressor (4- None, None.U 47 OS16 7 OS21). [N.JA C, 727-22.16(a)]

In Compliance Station Records "No

VOC (Total) -= 1.94 ithr applies to each compressor None None.

47 OS16 8 (OS4 - OS21). [N.J.A.C. 7:27-22,16(a)) In Compliance Station Records No

TSP - 0. 7 lblhr. Applies to each compressor (0S4 - Nore. None.U47 OS17 1 OS21 t7 [NiJAC0 7i27- 452(a) In Compliance Station Records No

Maximum Gross Heat Input <- 5.4 MMBTUthI (HHV), Other: Fuel burner rated capacity[N J.A.C. 7:27- None.047 OS17 2 Applies to each compressor (OS4 - OS21). (NJ A.C. 22.16(a)I.

In Compliance Station Records No7:27-22.16(a)]

CO - 12,09 Ib/hr applies to each compressor (OS4 - None. None.U47 OS17 3 OS21) [N.J.A C. 7:27-22.16(a)] In Compliance Station Records No

NOx (Total) - 22.31 blhr applies to each compressor None. None.047 S7 4 (OS4- OS21), [NJArC. 7:27-22,16(a)] In Compliance Station Records No

PM-1O (Total) -= 0.7 lblhr applies to each compressor None. None.U47 OS17 5 OS4 - OS2 1). [N8JC 7:27-22,16(a)] In Compliance Station Records No

S) 2 c= 0.47 lb/hr applies to each compressor (OS4 - None. None.U 47 OS17 6 0S2 1, [N.JAC 7:27-22.16(a)j In Compliance Station Records No

TSP <c 0.7 b1hr applies to each compressor OS4-. None. None.U41 OS17 1 S21. N.J.A C. 727-22,t6(a)] In Compliance Station Records No

VOC (Total) <= 1.94 llbhr applies to eanh compressor None. None.U 47 OS17 8 (OS4 - OS21. IN J.A.C. 7:27-22,16(a)] In Compliance Station Records NoTSP -= 0.7 Iblhr. Applies to each compressor (OS4 - None. None.

47 OS 1 2t ). N.J.AC. 7:27- 4.2(a)] In Compliance Station Records No

Maximum Gross Heat Input c= 5.4 MMBTUthr (HHV). Other. Fuel burner rated capacity[N.J.A.C 7:27- None.047 OS18 2 Applies to each compressor (OS4 - 0S21). (N.J.A.C. 22,16(a)].

In Compliance Station Records No7:27-22. 16(a)

CO -= 12 09 Ibl/h applies to each compressor (OS4 - None. None.U47 OS18 3 0S21). N J,A C. 7 27-22,16(a)] In Compliance Station Records No

UOc (S1 N otal)< 22.31 lblhs applies to each comrpressor None. None.47(OS4 OS21) [N.J A.C. 7.27-22A6(a)I :In Compliance Station Records No

PM-10 (Total) c- 0.7 Wbhir applies to each compressor None. None.047 (OS4 - 0$21). NJA,C. 7:27-22.16(a)] In Compliance Station Records No

S02 c- 0.47 Ibphs applies to each compressor (OS4 - None None,047 018 6 OS21). [N.JA.C. 7:27-22.16(a)] In Compliance Station Records No

tSP cc 0.7 blihs applies to each compressor (OS4 - None None.47 OS18 7

IS2s NJC. 7:27-21 16(a))

In Compliance Station Records NoVOC Tote1) -= 1.94 Ib/hr applies to each comnpressor None. None.U 47 OS18 8 (OS4 OS21) [NJA.C. 7:27-22,16(a)].

In Compliance Station Records No0SP4 p 0.7 Iblhr. Applies to each compressor (OS4 - None. None.U 47 O 019 1 0S21). IN,J AC 7:27- 4 2(a)0

In Compliance Station Records NoMaximum Gross Heat onput - 5.4 MMITUlhr (HHV). Other: Fuel burner rated capaciMy)N.J.AC, 7:27. None.

047 0S19 2 Applies to each compressor (OS4 - 0S21). IN JAC. 22.16(a)]. In Compliance Station Records No7:27-22.16(a)]

CO <= 12.09 Ibshr applies to each Compressor (OS4 - None. None47 019 3 0521). N.JAC. 7:27-22 16(a)

In Compliance Station Records NoNOx (Total) = 22.31 Iblhr applies to each compressor None. None.U 47 OS19 4 (OS4 -0021). [N.J.A.C 7:27-22.16(a)]

In Compliance Station Records NoPM-10 (Total) s= 07 lbihr applies to each compressor None None.U 47 0S19 5 (OS4 - OS21). [NJ AC. 7:27-22 '16()

04 OlO (04-02).)NJAC 7272 1)s)In Comrpliance Station Recnrds No

S02 c- 047 lb/Ir applies to each compressor (OS4 - None. None.U 47 OS19 6 OS21) [N.J A.C, 7:27-22.16(a)] In Compliance Station Records NoTSP c< 0.7 Ib/hr applies to each compressor (OS4 - None. None.

U47 OS19 7 OS2. [N.J,AC. 7:27-22.16taf) In Compliance Station Records No

VOC (Total) -= 1.94 Ishr applies to each compressor None. None.047 OS19 8 104 -00S21). )N.J.A.C. 7:27-22.16(a)] In Compliance Station Records No

coP <S 0,7 lb/hr. Applies to each oompressor 1004 - None. None.0 47 0S20 1 0021 )N.J.A.C. 7:27- 4.2(a)]

In Compliance Station Records NoMaximum Gross Heat Input - 5,4 MMBTU/hr (HHV). Other: Fuel burner rated capacpty[NJ.A.C. 7:27- None.U 47 0S20 2 Applies to each compressor (OS4 - OS21) [N.JA C. 22.16(a)1

In Compliance Station Records No7:27-22,16(alI

Page 66 oW 80

Section 6 - Complianue Star.sMEG1- N1c.ar LLC

top. Crc'ik and a5c-rn Generating Stations

Compliance Status Method to Is a ComplianceRef A Applicable Requirement Monitoring Requirement Recordkeeping Requirement (tI Compliance Determine Schedule CommentsNon-Comoipliance) Compliance Attached? (Yen/Not

C0 <= 12.09 b/hr applies to each compressor (OS4 - None. None.U 47 OS20 3 $21t). (N.J.A.C. 7:27-22.16a) In Copliance Station Recrcs Na

NOx (Total) - 22.31 b/hr applles to each compressor None. None.U 47 OS20 4 (OS4 - OS21). [N.J.A.C. 7:27-22,16(a)] In Compliance Station Records No

PM-10 (Total) <- 0.7 tb/hr applies to each compressor None. None.U 47 OS20 5 364 - OS21) [NJA C. 7:27-22,16(a)) In Compliance Station Records No

S02 <= 0.47 b/hr applies to each compressor (OS4 - None. None.U47 OS20 6 OS21). [N.J.A.C. 7:27-22.16(a)] In Compliance Station Records NoTSP -= 0,7 /h/hr applies to each compressor (OS4 - None. None.0 47 0020 7 0S21). N.J.A.C, 7:27-22.16(a)] in Compliance Station Records No

VOC (Total) /= 194 Ih/hr applies to each compressor None. None.U7 S20 (OS4 - OS21). [N.J A.C 727-22,16an Records N

TSP s- 0.7 h/hr. Applies to each compressor (OS4 - None. None.U 47 OS21 1 OS21), /N.J.A.C. 7:27- 4.2(a)] In Compliance Station Records No

Maximum Gross Heat Input 0 5.4 MMBTU/hr (HHV). Other: Fuel burner rated capacoy[N J A.C. 7:27- None,U 47 OS21 2 Applies to each compressor (OS4 - OS21). ]N.J.A.C. 22.16(a)].

In Compliance Station Records No7,27-22.16(a)]

CO no 12.09 i/hr applies to each compressor (OS4 - None. None.U 47 OS21 3 OS21) [N.J.A.C. 7:27-22.16(a)] In Compliance Station Records NO,

U - NOx (Total) - 22.31 b/hr applies to each compressor None. None.047 0S21 4 (OS4 - OS21). [N.J.AC. 7:27-22.16(a)] In Compliance Station Records No

S M-10 (Total) <- 07 lb/hr applies to each compressor None. . None.0 47 0S21/ 5 0,54 - OS21). [N.J.A.C. 7.27-22.16(a)] hr Compliance Station Records No

S02 <- 0.47 b/hr applies to each compressor (OS4 - None. None,U 47 OS21 6 0$21). [N.J.A.C. 7:27-22,16(a)] In Compliance Station Records No -

TSP = 0.7 /h/hr applies to each compressor (OS4 - None. None.U 47 OS21 7 002/) [N.J.A C. 7:27-22 16(a)] In Compliance Staeion Records NoVOC (Total) <- 1.94 ho/hr applies to each compressor None None.

0 47 OS21 8 (004 - OS21). [NJA,C. 7:27-22.16(a)] In Compliance Station Records No

Tank contents limited to a solution of - 15% sodium Other: For each delivery, monitor by reviewing delivery Other: Maintain delivery records per delivery. Thehypochlodte in water, [N...A.C. 7:27-22.16(e)] records such as MSDS, invoice, and/or bill of lading records shat indicate content of delivery, composition.U 49 OSO 1 that show content, composition, and quantity of the quantity delivered, and date of delivery wth sum-tn- In Compliance Station Records Node/ivery.[N.J.A.C. 7:27-22.16(o)]. date,[N.J.A.C. 7:27-22.16(o)].

Total Matedal Transferred v- 3 MMpabyr solution of Other. For each delivery, monitor by reviewing delivery Other: Maintain delivery records per delivery. The%15 sodium hypoch/odte in water. [N.J.A.C. 7:27- records such as MSDS. invoice, and/or bill of lading records shall indicate content of delivery, composition.0 49 000 2 22.16(a)] that show content. composition. and quantity of the quantity delivered, and date of delivery with sum-to- to Compliance Stat/on Records Nodetivery.[N.J.A.C. 7:27-22.16(o)] date.[N.J.AC. 7:27-2219/(o/],Tank contents timited to solution of -=1% ammonia in Other. For each delivery, monitor by reviewing delivery Other: Maintain delivery records per delivery. Thewater. [N.J.A.C. 7:27-22.16(e)) records such as invoice, and/or bill of lading that show records shall indicate content of delivery, composition.U 51 000 1 content. composition, and quantity of the quantity delivered, and date 0/ delivery with sum-to-' In Compliance Station Records No

delivery.[N.J.A.C. 7:27-22.169o)] date.[N.J.A.C. 7:27-22.16(o)],Total Materiat Transterred 0 4 MMpat/yr solution of Other: For each delivery, monitor by reviewing delivery Other: Maintain del/very records per delivery. The1% ammonia in water. Maximum annual throughput records such as invoice, and/or bi/t ot lading that show records shag indicate content of delivery, composition.U 51 OS0 2 based on preconstructian permit. [N J.A.C. 7:27- content co mposition. and quantity of the quantity delivered. and date of delivery with sum-to- tn Compliance Station Records No22.16(e)] detivery.[NJA.C. 7:27-22.16(o)] date.[N.J.A.C. 7:27-22.16(o)),Tank contents limited to a solution containing -= 99 Other: For each delivery, monitor by reviewing delivery 0ther: Maintain delivery records per delivery. Thepercent boric acid solution in water. [N.J A C. 7:27- records such as invoice, and/or bill of lading that show records shall indicate content o1 delivery. compositionr,0 53 000 1 )22.1/ha)] content composition, and quantity of the quantity delivered. and date of delivery with sum-to- tn Compriance Station Records NOdelivery.[N.J.A.C. 7:27-22.16(o)], date.[N.J.A.C. 7:27-2216(o)0Total Material Transferred -= 315 MMgat/yr solution of Other: For each delivery, monitor by reviewing delivery Other: Maintain delivery records per delivery. The55 % (percent) boric acid in water. ]N.J.A.C. 7:27- records such as invoice, andlor bill of lading that show records shall indicate content of delivery. composition.0 53 000 2 22.16(a)] content, composition, and quantity of the quantity delivered, and date of delivery with sum-to- to Comp/iance Station Records NOdelivery.]N.J.A.C. 7:27-22.16(o)]. date.[N.J.A.C. 7:27-22.16(o)].Particulate Emissions - 0,5 h/hr based on 0.02 None. None.U 55 OS0 1

tr/sct. [N.J.A.C 7:27- 62(a))

In Compliance Station Records NoPa0iculate emissions no greater than 20% opacity, None. None,exclusive of visible condensed water vapor. for more

0 55 000 2 than 3 minutao in any consecadtve 30-minute period. tn Comotiance Stat/on Records No[N.J.A.C. 7:27-6,2(d)] & [N.J.A.C. 7:27- 6.2(e)]

e a80O

"liont II tyre Cre~ek arid Sir1uro Generatingy .dta tins

•[Compliance Status I Method to Is t Corpliaene

Rat 1 Applicable Requirement Monitoring Requirement Recordkeeptng Requirement (In Comptiance OWtermine Schedule Comments

I I N o n -C o mnp lia n ce ) C o np lia n c e A tta c h e d ? (Y e olN o )

Permittee shall not use the equipment in a manner Other: The permottee shall inspect PT53 once per Recordkeeping by manual logging of parameter oncewhich will cause visible emissions exclusive of calendar day when the control devices (CD27 or C028) per calendar day during operation for PT 53 in either acondensed water upoor. N.J.A.C 7:27-22.16(e)] are operating [N.J.A.C. 7:27-22.16(o)]. readily accessible permanently bound logbook or other

electronic data management system. and retain thefolowing records:(1) Date and time of inspection;(2) Emission point number:

U 55 1S0 (3) Operational status of the equipment; In Compliance Station Records No(4) Observed results and conclusions:(5) Description of corrective action taken d needed;(6) Date and time opacity problem was solved, itapplicable:17) N J.A.C. 7 27B-2 results if conducted: and(8) Name of person(s) conducting inspection. [N,J.A.C.7:27-22 16(o)]

TSP: BT, Maximum emission rate based on None. None NuU 55 US0 4 preconstruction permit [N JA.C 7:27-22 16(e)]

Raw material tinited to sand mmd other additive(s) that Other: Monitored by inspecting raw material bills of Other: Maintain alt records of raw material bills ofare not HAP as defined in 40 CFR 63. 1(a)(2) and that ladingtrnvoices [N.J.A.C. 7:27-22.16(o)] ladinglinvuices. The record to show type, quantity,U 55 OSd improve the abrasive qualities of the sand blast and date of raw material received iNIJ.A.C. 7:27- In Compliance Station Records Nomaterial IN J.A.C. 7:27-22 16(e) i 22.16(o))Pressure Drop = Ob5 and Pressure Drop - 5 inches None. None.wc across C027. Ifthe pressure drop varies outside

U 55 US0 g the normal operating range, corrective action shall be In Compliance Station Records Notaken. [N.J.A.C. 7:27-22.16(a)[

The owner or operator shall maintain the control Other: The owner or operator shall perform a visual Recordkeeping by manual logging of parameter upondevices (CD27 and CD28) in accordance widh the inspection of the control device filters prior to opuration occurrence of eventatanufacturer's recommended procedures. [N.J.A.C and repair or replace any defective or malfunctioning The owner or operator shall maintain readily available7:27-22.16(a)[ components.[N.J.A.C. 7:27-22.16(o)). records for maintenance activities and inspectionr. The

records shall include the date of the activity and/orinspection, results of the inspection, a description of NoU 0db 7 work performed and the name of the person In Compliance Station Recordsperforming the activity or inspection Records shall bemaintained in either a readily accessible permanently

bound logbook or other electronic data managementsystem [N.J.A.C. 7:27-22.16(o)]

No person shag cause. suffer, allow or permit visible None. None.

smoke to be emitted into the outdoor air from theU 56 OSd combustion of utel except for a period of not longer In Compliance Station Records Nothan three minutes in any consecutive 30-minLite

period. [N.J.A.C. 7:27- 312(a))U 56 OSS 2 NOx ITotal) v- 20.6 tonstyr. [N.J.A.C. 7:27-221 None. None. In Compliance Station Records NoU ad 0 3 CO - 13.4 tonsiyr. [N.J.A.C. 7:27-221 None. None. In Courpliance Station Records NoU 56 055 4 VOC [Total) v= 3.5 tonslyt. [N.J.A.C. 7:27-22[ None. None In Compliance Station Records NoU 56 OSO 5 TSP o= 49 tonslyr. [N.J.A.C. 7:27-22] . None. None. In Compliance Station Records NoTSP - 1349 lblhr. [N.J.A.C. 7:27- 4.2(a)] TSP: Monitored by stack emission testing upon request TSP: Recordkeeping by stack test results upon reqtrestU 56 OSS 6 of the Department, based on the average of three of the Department. [N.J.A.C. 7:27- 4.4(a)] In Compliance Stack Testing Notests. [N.J.A.C. 7:27- 4.4(a)] Reprt

PM-10 (Total) u- 5 7 tonicyr. [N.J AC 7:27-22.16(a)] None. None.U 56 OS0 7 .In Compliance Station Records No

U 56 80 8 S02 u= 17.4 tonslyr. IN.J.A.C. 7:27-22.16(a)] None. None. In Compliance Station Records NoArsenic compounds u- 0.0014 tonslyr. [N J AC. 7:27- None. None.U 56 05 9 221 In Compliance Station Records No

Beryllium compounds -= 0.001 1 tonslyr IN.JAC, None. None,U 56 US0 10 7:27e221

. In Compliance Station Records NoLead compounds v= 0.0031 tonslyr. iN. JAC 7:27-221 None. None.U 56 OSO 11

In Compliance Station Records NoPolycyclic organic matter - 0 0081 tonslyr. [N.J A.C. None. No.In Compince Station Recors NU 56 OS0 1 2 7':27-22] nCmlac tainRcrsNFuel Oil Usage - 686,000 MMBTU (HHV) per any 12 Prien Oil Usage: Monitored by fuel low/firing rate Fuel Oil Usage: Recordkeoping by data acquisitionconsecutive month period (for two boilers combined). instrument continuously. based on a consecutive 12 system (DAS) I electronic data storage continuously.U 56 OS 1 N.J.A C. 7:27-22.16(a)] month period trolling I month basis). [N.J.A.C. 727-221 [N.J.A.C. 7:27-221 In Compliance Station Records No

Page 6B of 80

Section 6 - Compliance StatusPtEG ti4le 1ar ,I C

I fope Creek od Saleou Generating Stations

Complianoe Status Method to Id a ComplianceRat # Applicable Requirement Monitoring Requirement RecordkeepIhg Requirement (in Compliance Determine Schedule CommentsNion-zompll.a ce) Compliance Atta ched? (Yes/No)6 0 Sfur Content in Dis0itate Oil - 0,05 % by weight Monitored by review of fuel delivery records once per Recordkeeping by fuel certification receipts once per o ince S oU 56 S0 14 [N.J.A.C. 7:27-221 bulk fuel shipment. [N.J.A.C, 7:27-221 bulk fuel shipment. [N.J.A.C. 7:27-221 ~ opine SainRcrs N

* 56 OSO 15 Sulfur Content in Distillate Oil -= 0,3 % by weight Mlonitored by review of fuel delivery records once per Recordkeeping by fuel certificatiorn receipts once per I opine SainRcrs NbuN.J.A.C 7:27-9.2(b)] bulk fuel shipment. [N.J.A.C. 7:27-22] bulk fuel shipment. [N.J.A.C. 7:27-221 In Compiance Statio Records NoSulfur Content in Ostillate Oil -= 0.5 % by weight [40 Monitored by review of fuel delivery records once per Recorrdkeeping by fuel certification receipts once perCFR 60.42c(d)] bulk fuel shipment. [40 CFR 60.44c(g)] bulk fuel shipment Records of the name Of the oilsupplier and a statement from the oil supplier that theU8 5 OS0 1 oil complies with the specifications under the definition In Compliance Station Records NoSofdistillate oil as specified at 40 CFR 60 41c shall bemaintained. [40 CFR 60.48(c)(e)(t I)]

Shutdown Period <= 180 days. None Shutdown Period: Recordkeeping by givg of parameterExisting Aux Boilers No 1, 2, and 3 (F 15, E16 and or readily accessible computer memories.[N.J.A.C,S S 1 7), shall be permanently retired within 180 days after 7:27-221.S56 oso 17 initial operation (first fire) of the two new aux boilers In Compliance Station Records No(E62 and E 63) covered under this approval. INJAC.

7:27-22.16(a)]

At any time no move than two of the five auxilary None Other. Manual logging of parameter or readily8 oilers ( three Existing Aux Boilers No. 1. 2, and 3 i.e accessible computer memoies.[N.J.A.C. 7:27-221.U56 OSO 18 5, l6andE17 and two newAux boilers E62 and In Compliance Station Records NoE63) shall be operational. IN.J.AC. 1:27-22,16(a)]

The owner or operator shall maintain records, and Recordkeeping by manual logging of parameterreport to the Administrator, all information specified at semiannually: once every six months; six month cycleU 56 OS0 19 40 CFR 60 48c(e). [40 CFR 60.48c(d)] shall begin on January 1 and July 1 of each year. Theowner or operator shall record all applicable to Complince Station Records Noinformation specified at 40 CFR 60.48c(e)(1) through(t 1). [40 CFR 60.48c(d)

The owner or operator shall record the amount of each Recordkeeepig by manual logging of parameter daily.U 56 OSs 20 fuel combusted in the unit each operating day. [40 [40 CFR 60.48c(g)[ In Compliance Station Records NoCFR 60.48c(g)]

The owner or operator shall maintain all required None,U 56 OSO 21 records for a period of two years following the date of

In Compliance Station Records Nosuch record. (40 CFR 60.48c(i)]

Conduct a comprehensive stack test at emission points Other. Stack emission testing. Stack test shall be None.( PT57) to demonstrate compliance with the CO, conducted for CO, NOx. TSP and VOC emissions.NOx, TSP and VOC emission limits. [N.J.A.C. 7:27- Based on any 60-minuts peood.[N.J,A.C. 7:27-22.16(a)] 22.16(a)].

U 56 OS0 22 In Compliance Station Records No

.! 080

Section 6i-* ce StaitusP55EG i~r 1.,.C

t hipe C-ck -d 5 nlvir Gnic.tiig 9Sttio ns

Comnpl•ance Statw$ Method to ls.a CoipllanceRef # Applicable Requtrement Monitoring Requirement " Reordtkeeptng Requirement fIn Compliance Determine Shedrute CommentsNne-Cneompliance) Compliance Attached? iYeotNo

Conduct a comprehensive stack test at emission point Other. Stack emission testing. Stack test shall be NonePT57 at least 18 months prim to the expiration of the conducted for CO. NOx. TSP and VOC emissions.approved operating permit to demonstrate compliance Based on any 60-minute period [N.J.A.C 7:27-with the CO. NOx, TSP and VOC emission limits. 22.16(a)].[N.J.A.C. 7:27-22g 16(a)l

U 56 OS0 23 In Compliance Station Records No

Maximum Gross Heat Input <= 7,19 MMBTUIhr (HHV). Other: Fuel burner rated capacity[NAJ.A C. 7:27- NoneNU 56 OSt 1 N J.A.C. 7:27-22 16(a)l 22.16(a)]. In Compliance Station Records NoNo viaible emissions exclusive of visible condensed Other: Visual Determination. Weekly when burning # 2 Other: Manual logging of observations in aoater vapor. except for a period of not longer then fuel oil. The perorittee shall conduct visual opacity permanently bound logbook or readily accessiblethree minutes in any consecutive 30-minute period inspections during daylight hours. Visual inspections computer memory, Weekly when burning # 2 fuel oilN.J.A.C.7:27-312(at & [NJ A.C. 7:27- 3.2(c) shall consist of a visual survey to identify if the stack The permittee must retain the following records; (1)

has visible emissions, lather than condensed water Date and time of inspection; (2) Emission Pointvapor), greater than the prescribed standard I visible number; (3) Operational status of equipment; (4)emissions are observed, the permittee shall do the Observed results and conclusions: (h) Description offollowing (1) Verify that the equipment and for control corrective action taken if needed; (6) Date and timedevice causing the emission is operating according to opacity problem was solved, if applicable; (7) NJAC.manufacturers specifications and the operating permit 7.2713-2 results if conducted, and (8) Name ofcompliance plan If the equipment or control device is person(s) conductiig irspecton.{N.J.A.C, 7:27-

Use6 OSt 2 . not operating properly. the permritee shall take 22t16()o) In Coopliance Station Records Nocorrective action immediately to elimoriate the excessenrissions The permittee must report any permitaiolation to NJDEP pursuant to N.J A.C. 7:27- 22.19.(2) If the corrective action taken in step one does notcorrect the opacity problem within 24 hours, theperrittee shall perform a check via a certified opacityreader, in accordance with NJ.A.C 7:278-2.Such a test shall be conducted once per day untilcorrective action is taken to successfully correct theopacity problem, The permgitee must report anycontinuing permit violation to NJDEP pirsuarnt toN.J.A.C. 7:27-22.19.INJ.AC. 7:27-22.16(o)].

NOs (Total) - 4.5 lblhr. IN.J AC. 7i27-221 NOx (Toeal): Monitored by stack emission testing once NOx (Total): Recordkeeping by stack test results onceU56 OSt 3 initially and every 5 years, based on any 60 rainuti Initially and every 5 years. [N.J A.C. 7:27-22.t6(a)l In Compliance Stack Testing No

period. )N.J.A.C. 7:27-22,16(a)) ReportNOx (Total) v- 0.06 Ib/MMBTU. [N.J A.C. 7:27-223 NOx (Total): Monitored by slackeemission testing once NOx (Total): Recordkeeping by stack test results once

U 56 OSt 4 initially and every 5 years, based art any 60 minuate irritially and every 5 years. [N.JA.C. 7:27-22t16(a)] In Compliance Stack Testing Noperiod. [N.J.A.C. 7:27-22.16(a)) ReportCO = 3 bdnr. N.J.A.C. 7:27-22) CO. Monitored by stack emission testing once initially CO: Recordkeeping by stack test results once initially

U 56 OSI 5 and eavery 5 years, based on any 60 minute period. and every 5 years. IN.J.AC 7:27-22.16(a)] In Compliance Stack Tenting N"[N.J.A.C. 7:27-22.16(a)) ReportCO 0 039 Ib]MMBTU. [N.J.A.C. 7:27-221 CO: Monitored by stack emission testing once mintally CO: Recordkeeping by stack test results once initially

U 56 OSt 6 and every 5 years, based on any 60 minute period. and every 5 years. [N.J.A.C. 7:27-22,16(a)] In Compliance Stack Testing No5N.J.A.C. 7:27-22.16(a)] RIIport

VOC (Total) v- 0.75 lblhr. [N.J.AC. 7:27-221 VOC (Total): Monitored by stack emission testing once VOC (Total): Recaidkenping by stack test results once0 56 OSt1 7 initially and every 5 years, based on any 60 minute initially and every 5 years. [N.J.A.C. 7:27-22.16(a)] tn Compliance Stack Testing NOperiod. [N JAC, 7:27-22.16(a)I Report

VOC (Total) n- 0.01 IbIMMBTU. {N.J.A.C. 7:27-22) VOC (Totat): Monitored by stack emission testing once VOC (Total): Recordkeeping by stack test results onceU 56 Os 8 initially and every 5 years, based on any 60 minute initiafty and avery 5 years. N.J.A.C 7:27-22.16(a)] In Compliance Stack-Testing No

pedod. N.J.AC ,7:27-22.16(a)) Report

Page 70 of 80

Sietion 6r - Cnm pliance StatusPSPG Nuotlear I.C

Iope Creek ad Sale, Generating Stations

Compliance Status Merthod to h. a• ComplianceRef # Applicable Requirement Monitoring Requirement Recordkeeplng Requirement (in Corptiance Determine Schedule CommentsNon-Compliance) Comrplirnce Attached? (Yes/No)

TSP en I1 lblhr. N.J.A. C. 7:27-221 TSP: Monitored by stock emission testing once initially TSP: Recordkeeping by stack test results once initiallyU 56 ost 6i and nvery S years. based on any 60 mrinute beriod and evr 5 years. (NiJA.C. 7:27-22.16(a)) In Coreplance takTtigNo1N.J.A.C. 7:27-22.16(a)] Report

PM-10 (Total) -= 1.24 tbfnr. [N.J.A.C. 7:27-2216(a)) PM-tO (Total): Monitored by stack emission testing PM-l0 (Total): Recordkeeping by stack test resultsU 6 O1 t0once initially and every 5 years, based on any 60 once inititally and every 5 years [N.J.A.C. 7:27- Inomlac SakTetg Nous5 oST t0 In Compliance SakTsting Nminute period. (None] 22.16(a)) Report

U5s OS1 11 02 n 3.861Sbl IN.N.AC. 7:27-221 None. None. In Compliance Station Records NoCO e= 100 ppmvd @ 7% 02. [NJ.&AC. 7:27-16.8(b)2] CO: Monitored by stack emission testing once initially CO: Recordkeeping by stack test results once initiallyU U 1 and every 5 years. based on the average of three 1 - and every 5 years. Refer to stack testing requirements Stack Testing56 OSt 12 hour tests. Refer to stack testing requirements in this in this permit. (N.J.&C. 7:27-16.23(a)2) In Compliance Report Nopermit. (N.J.A.C. 7:27-16,23(a)21

VOC (Total) e- 50 ppmvd @ 7% 02. IN.J.&C, 7:27- VOC (Total): Monitored by stack emission testing once VOC (Total): Recordkeeping by stack test results oncet 6.8(b)1l initially and every 5 years, based on the average of initially and every 5 years. Refer to stack testing Stack TestingU56 OSI 13 three 1-hour tests. Refer to stack testing requirements requirements in this permit. [NJA.C 7:27-16.23(a)2] In Compliance Report Noin this permit. [NJ.A.C. 7:27-16 23(a)2)

NOx (Total) e= 0.12 IbIMMBTU. [N.J.A.C. 7:27-16.7(b)] NOx (Total): Monitored by stack emission testing once NOx (Total): Recordkeeping by stack test results onceinitially and every 5 years, based on the average of initially and every i years. Refer to stack testing Stack TestingU 56 OS1 14 three 1-hOur tests. Refer to stack testing requirements requirements in this permit )N.J.AC. 7:27-19.t5(a)21 In Compliance ReportNoin this permit. (N.J A.C. 7:27-19.t 5(a)21

U 56 ost 15 TSP e- 1 35 lb/hr. [N.J.A.C. 7:27, 4.a] None.. None. In Compliance Station Records Nogoiter fuel limited to low sulfur distillate oil. )N.J.A.C. None. None.U 5 oS 7 t6 .:27-22.16(e)] In Compliance Station Records No

Opacity = 20 % except for one 6-minute period per Opacity: Monitored by stack emission testing once Opacity: Recordkeeping by stack test results oncehour of not more than 27% opacity. This opacity initially, based on 6 minute blocks. Performance tests initially and every 5 years. [40 CFR 60 4"c~i)]U 56 aS1 17 standard does not apply during periods of startup. shall be conducted as specified at 40 CFR 60.8 using In Compliance Stack Testing Noshutdown or malfunction. (40 CFR 60.43cc() test methods as specitied at 40 CFR 60 45c. [40 CFR Report60.45c(a)I

Adjust the combustion process in accordance with Other: Adjust combustion process by boiler tune-up. Recordkeeping by manual togging of parameterN.J.AC,7:27-19.16 each calendar year. Record NOx Annually.[N. JA.C. 7:27-16.8(b)], annually in a permanently bound lngbook or readilyand CO conc. before and after each adjustment and accessible computer memory containing the followingthe 02 conc. at which NOx and CO were measured, information for each adjustment:(N.JA.C. 7:27-16.81(b)3i•) 1. The date of the adjustment and the times at which tbegan and ended;2. The name, title and affiliation of the person whomade the adjustment;3. The NOx concentration in the effluent stream, ineither ppmv or ppmvd. before and after eachadjustment was made;4. The CO concentration in the effluent stream in eitherppmv or ppmvd, before and after each adjustment wasU 56 OSt 18 made: In Compliance Station Records No5. The concentration of 02 at which the CO and NOxconcentrations pursuant to the steps 3 and 4 weremeasured; and

6. Any other information which the Department or EPAhas required as a condition of approval of any permitor certificete issued for the equipment or sourceoperation. [N.J.A.C. 7:27-16.8(c))

Maximum Gross Heat Input e= 74.9 MMBTUthr (HHV). Other: Fuel burner rated capacity[N.J.A.C. 7:27- None.U U. .S2 1 (NA,C, 7:27-22.16(a)] 22.16(a)]. Is Compliance Station Records No

S0160 0

smeieo 6- Wz e Slow,0

I hr~pc Creek rod Salemrr (.enerrtrop, Statirms

Compliance Status Method to [ t Coerpilanro

Ref # Applicable Requirement Monitoring Requirement Recodlkeeptng Requirement (te CoDrtoa• sc•edule CommentsAIo-Complianic) Compliance Attached? [Yesflo)

#No visible emissions exlusive of visible condensed Other: Visual Determinaton. Weekty when burning #2 Other: Manu ogging o0 observations in amater vapor. except for a period of not longer than fuel oil. The permittee shall Cordaud visual opacity permanenly bound togbook or readily accessiblethree minutes in any consecutive 30-erinte period inspections during daylight hours. Visual inspections computer memory. Weekly when burning t 2 fuel oil,N.J.AC.7:27-3 2(a)l & [N.J AýC 7:27- 3.2(c)] shall consist of a visual survey to identity if the stack The permittee must retain the following hecords; (1)

has visible emissions, (other than condensed water Date and time of inspection; (2) Emission Pointvapor), greater than the prescribed standard If visible eumber: (3) Operational status ot equipment; (4)emissions are observed, the permittee shall do the Observed results and concusiotns: (5) Description offollowing: (1) Verify that the equipment and for control corrective action taken if needed; (6) Date and frnedevice causing the emission is operating according to opacity problem was solved, it apylicable; (7) N.J.A.Cmdirufataurers specifications and the operating permit 7 271-2 results if conducted; and (8) Name ofcompliance plait If the equipment or control device is person(s) conducting inspection.[N,JArC. 7:27-

U 56 OS2 2 not operating properly, tire permiltee shall take 22.16(c) to Compliance Station Records Nocorrective action immediately to eliminate the excessemissions. The permittee must report any permit,oplation to NJDEP pursuant to N.J AC. 7:27- 2219.(2) I the corrective action taken in step one does notcorrecth re opacity problem wathin 24 hourrs. thepelmittee shag perform a check via a ceofhed opacity

meader, in accordance with N J.A.C 7:271-2.

Such a test shall be conducted once per day until

corrective action is taken to successfully correct theopacity problem. The permittee must report any

continuing permit violation to NJDEP pursuant toN.J.A.C. 7:27-22. 9.[NJ.A.C. 7:27-22.16(ofl_

NOx (Total) -< 4.5 abbh [N.J A.C. 7:27-22) NOx (Total): Monitored by stack emission testing once NOx (Total): Recordkeeping by slack test results once

U 56 OS2 3 initiatly and every 5 years, based on any 60 minute initially and every 5 years. )N.J.A.C. 7:27-22.16(a)] In Compliance Stack Testing Noperiod. )N.J.A.C. 7:27-22.16(a)) Report

NOx (Total) - 0.6d IbIMMBTU. (N.J AC. 7:27-221 NOx (Total): Monitored by slack emission testing once NOx (Total): Recordkeeping by stack test results once

U 56 OS2 4 initially and every 5 years, based on any 60 minute initially and every 5 years. [N.J.AC. 7:27-22.16(a)) In Compliance Stack Testing Noperiod. [N.J.A.C. 7:27-22.16(a)) Report

S CO v= 3 lbthr. [N.J.A.C. 7:27-221 CO: Monitored by stack emission testing once ritally CO: Recordkeeping by stack test results once initially

U 56 02 5and every 5 years, based on any 60 minute period. and every 5 years. )N.J.A.C. 7:27-22.16(a)] In Compliance black Teotirg No(N.J.A.C. 7:27-22.16(a)] Report

CO c= 0.039 Ib/MMBTU. [N.J.A.C. 7:27-221 CO: Monitored by stack emission testing once initially CO: Recordkeeping by stack test results once initially

U 56 OS2 6 and every 5 years, based on any 60 minute period. and every 5 years. [N.J.A.C. 7:27-22.16(a)] In Compliance Stack Testing NoN.J.A.C. 7:27-22.16(a)I Report

VOC (Total) y h 0.79 ibhr. [N J.AC. 7:27-22) VOC (Total): Monitored by stack emission testing once VOC (Total) Recorekeeping by stack test results once

U 56 OS2 7 T initially and every 5 years, based on any60 minute initially and every 5 yems. [N.J.A.C. 7:27-22.16(a)) In Compliance Stack Testing Noperiod. [N.J.A.C. 7:27-22.16(a() Report

VOC (Total) = 0t01 IbSMMBTU (N.JA.C. 7:27-22) VOC (Total). Monitored by stack emission testing once VOC (Total): Recordkeeping by stack test results onceU 56 OS2 y initially and every 5 years, based on any 60 minute initially and every 5 years (N.J.A.C. 7ý27-22 16(a)) In Compliance Stack Testing No

U9e6riod. )N.J.A.C 7:27-22.1A(a)) Report

TSP -= 1.1 b~h., )N.J.A.C 7:27-221 TSP: Monitored by stack emission testing once initially TSP: Recordkeeping by stack test results once iniially Slack Testng

056 OS2 8 and every S years, based on any 60 minute period, and every 5 years. [N.J.A.C. 7:27-22,16(a)) In Compliance Rept No(N J .A.C. 7:27-22 16(a)] I Report

PM-td (Total) v- 1.24 lb/hr. [N J.A C. 7:27-22A16(a)) PM-10 (Total): Monitored by stack emission testing PM-10 (Total): Recordkeeping by stack test rosults

U 56 OS2 n0 once initially and every 5 years, based on any 60 once initially and every 5 years. [N JA.C 7:27- In Compliance Stack Testing Nominute period. INonel 22 16(a)] Report

U 56 OS2 11 S02 v- 3.8 bherr. [N.J.A C. 7:27-22) None.. None. In Compliance Station Records No

CO v= 100 ppmod @ 7% 02. [N,J.A.C. 7:27-16,8(b)21 GO: Monitored by stack emission testing once initially CO: Recaodkeeping by stack test results once initiallyand every 5 years, based on the average of three t- and every 5 years. Refer to stack testing requirements Stack Testing No

U 56 OS2 12 hour tests. Refer to stack testing requirements in tgis in this permit )N.J.A.C 7:27-16 23(a)21 In Compliance Reportpermit. [NJ.A.C. 7:27-16.23(a)21

VOC (Total) - 50 ppmad @ 7% 02. N.J A C. 7:27- VOC (Total): Monitored by stack emission testing once VOC (Total): Recordkeeping by stack tesl results onceUi56 OS2 13 16 8b)I] initially and every S years, based cn the average of initially and every 5 years. Refer to stack testing Stack Testing No

three 1 -hour tests, Refer to stack testing requriremoots leqcirements in this permiL (N.JA.C. 7:27-16.23(a)2) In Compliance Reportin this permit. [N.J.A.C..7:27-16.23(a)21

NOo(Total)v- 0.12 IblMMBTUl [N.JA.C. 7:27-t1.7(b)] NOx (Total): Monitored by stack ermission estingvorce NOx (Total): Recocdkeepieg by stack test results onceinitally and every 5 years, based on the average of initially and every 5 years. Refer to stack testing Stack Testing Nothree 1-hour tests Refer to stack testing requirements requirements in this permit. [N.J.A.C. 7:27-191.5(a)21 Ic Comptidoce Reportin this permit. )N.J.A.C. 7:27-19,15(a)21

U 56 OS2 15 TSP y= 13,5 Iblhr. )N.J.A.C. 7:27- 4a) None. Norre. In Compliance Station Records No

Boiler toel limited lo lom sufur distillate oil. IN.J.A.C. None. None.U 56 OS2 18 7:27-22.16(e)] In Cornylolnce Statin Records No

Page 72 of 80

Section 6 - Compliance StatusFSEG Nucoear I.LC

I frpe Creek and Saem Generating Stuatlks

j Corpl.ance Status Method to Is a ComplianceRef # Applicable Requirement Monitoring Requirement Recordkeepling Requirement fIn Cormplitanoe Determine Schedult CommentsNworn-mpliance) Compliance Attached? ffesllNo)

Opacity <= 20 % except for one 6-rinute period per OpaCity: Monitored by stack emission testing once Opacity: Recordkeeping by stack test results oncehour of not more than 27% opacity. This opacity initially, based on 6 minute blocks. Performance tests initially and every 5 years [40 CFR 60.48C(i)]U 56 OS2 17 standard does not apply during periods of startup: shall be conducted as specified at 40 CFR 60.8 using In Compliance Station Records Noshutdown or malfunction, (40 CFR 60,43c(c)] test methods as specified at 40 CFR 60.45c, [40 CFR60.45c(a)]

Adjust the combustion process in accordance with Other: Adjust combustion process by boiler tune-up. Recordkeeping by manual logging of parameterN.J.A.C.7:27-19.16 each calendar year. Record NOx Annually.[N.J.A.C. 7:27-16.8(b)). annually in a permanently bound logbook or readilyand CO conc. before and after each adjustment and accessible computer memory containing the followingtoe 02 conc. at which NOX and CO were measured. information for each adjustment:[NJAC. 7:27-16,8(b)3ii( 1. The date of the adjustment and the times at which itbegan and ended:2. The name, Itle and affiliation of the person whomade the adjustment;3. The NOx concentration in the effluent stream, ineither ppmv or ppmvd, before and after eachadjustment was made;4. The CO concentration in the effluent stream in eitherppmv or ppmvd. before and after each adjustment was

U 06 OS2 18 made: In Compliance Station Records No5. The concentration of 02 at which the CO and NOxconcentrations pursuant to the steps 3 and 4 weremeasured: and0. Any other information which the Department or EPAhas required as a condition of approval of any permitor certificate issued for the equipment or sourceoperation, (N.J.A.C. 7:27-16.6(c))

CO 0, O1f4 tonn/yr. Annual emission lomit based on None. None.U 57 OSh 1 the total operating time of 250 hours/year. [N.J.A.C,

In Compliance Station Records No7:27-22.16)a)]

NOx (Total) -= 0.64 tonstyr. Annual emission limit None. None.U 57 OSO 2 based on the total operating time of 250 hours/year.

In Compliance Station Records No(NJA.C. 7:27-22.16(a)]

VOC (Total' <= 0.051 tunslyr. Annual emission limit None. None.U 57 OS0 3 based on tire total operating time of 250 hours/year.

In Compliance Station Records No[N.J/AC. 7:27-22.16(a)I

PM-10 (Total) n= 0.046 tons'r. Annual emission limit None. None.U 57 OS0 4 based on the total operating time of 250 hoursfyear.

In Compliance Staton Records No[NJ.A.C. 7:27-22.16(a)ft

S02 <= 0043 fonslyr. Annual emission limit based on Nonte. None.U 57 OSO 5 the total operating time of 250 hours/year. N/J.A.C,

In Compliance Station Records No7:27-22. 16a)]

TSP cv 0.046 tonstyr. Annual emission limit based on None. None.U 57 OS0 6 the total operating time of 250 hourniyear, IN.J.A.C.

In Compliance Station Records No7:27-22.16(a)(

Hours of Operation n= 250 hr/yr. [N.J/A.C. 7:27- Hours of Operation: Monitored by hour/time monitor Hours of Operation: Recordkeeping by manual logging22.16(a)] continuously, based on one calendar year. The of parameter each month during operation. Thepermitlee shall install, calibrate and maintain in peromitlee shall record in either a permanent bound logaccordance wth the manufacturer's specifications, a book, or in readily accessible computer memorias. dreU 57 OS0 7 totalizing hour meter to monitor the total hours of monthly hours of operation of the generator and madeUperation per year for the generator N/.A.C. 7:27- available to the representatives of the Department of In Compliance Slatme Records No22.16(e) &. [N.J/A.C. 7:27-22.16(o)] Environmental Protection upon request for a pedod of

five years after the date of each record N/J.A.C. 7:27-22.16(e) &. [N.J/A.C. 7:27-22.16(o)]

TSP -= 0,678 Wbytr. Particalate emission limit from the None. None,U 57 OSI I combustion of fuel based on rated heat input of source. to Compliance Station Records No(N/.A.C. 7:27- 4.2(a)]

Sulfur Content in Fuel <- 0.3 % sulfur by weight. Sulfur Content in Fuel: Monitored by review of fuel Sulfur Content in Fuel: Recofdkeeping by fuel2 Maximum allowable sulfur content in fuel oil by fuel delivery records per delivery. (N/JAC. 7:27-22.16(o)] cedihcation receipts per delivery showing sulfurU 57 OS1 2 type/viscosity and geographical zone (Salem County). content. [N/J.A.C. 7:27-22.16(a)) In Compliance Station Records NoN/..A.C. 7:27- 9,2(b))

0.y 00

t-uoSection 6 - B c e ;tatri.

IIieCricek and Salemr Gcrrr-.atirny Statrrrns

Coplance, Status Method to Ita ComplianceRef # Applicable Requirement Monitoring Requirement Recordikeeping Requirement (in Compliance etermine Schedule ComnmentsNon-Compianc.) Compliance Attached? (YeslNo)

5 3 Maximum Gross Heat Input -O 1.13 MMBTU/hr (HHV). Other. Fuel burner rated capacity[NJ.A.C. 7:27- None. In Corpliance Station Records NoU 57 OSt 4 CO -= 1.11 Ib/hr. [N.J.A.C. 7:27-22.16(a)) None. None. In Compliance Station Records NoU 57 OSI 5 NOx (Total) n- 5.15 fb/tbr. IN.JA.C 7:27-22.16(a)l None. None. In Compliance Station Records NoU 57 OS1 r VOC (Total) -= 0.41 Ibthr. IN.J.A.C. 7:27-22.16(a)) None. None. In Compliance Station Records NoU 57 OS1 7 PM-10 (Total) -o 0.37 Ib/hr. jN.J.A.C. 7:27-22.16(a)) None. None. In Compliance Station Records NoU 57 OSt 8 S02 = 0.34 IN/hr. IN J.A.C. 7:27-22.16(a)] None. None In Compliance Station Records NoU 57 OSt 9 TSP = 0.37 Ibthr. N.J A.C. 7:27-22.16(a)] None. None. In Compliance Station Records NoCO = 0.37 tons/yr. Annual emission limit based on None. None.U58 S0 1 the total operating time of 250 hours/year. IN.J.AC. In Compliance Station Records No7:27-22.16(a)]

NOn (Total) <= 1.71 tons/yr. Annual emission limit None. None.U 58 OSO 2 based on the total operating time of 250 hourstyear. "In Compliance Station Records No[N.J.AC. 7:27-22.16(a)]

;VOC (Total) -= 0.14 tonslyr. Annual emission limit None. None.U 58 OSO 3 based on the total opeiating time of 250 hours/year. In Compliance Station Records No(N J.A C. 7 27-22 16(a)(

PM-10 (Total) = 0 12 tonstyr. Annual emission limit None. None.U 58 OSO 4 based on the total operating time of 250 hourslyear.

In Compliance Station Records NoIN J.A C. 7:27-22..16(a)

S02 -= 0. 1t tonslyr. Annual emission limit based on None. None

U 58 OS0 5 the total operating time of 250 houos/year. [N.JA C. In Compliance Station Records No7:27-22t16(a)] "

TSP -=0.12tonstyr. Annual emission limit based on None. None.U 58 OSO 6 the total operating time of 250 hourn/year. [N.J.A.C.

In Compliance Station Records No7:27.22.16(af)

Hours of Operation 0=250 hr/yr. [NJ.A C 7:27- Hours of Operation: Monitored by hour/time monitor Hours of Operation. Recordkeeping by manual logging22.16(a)) continuously. based on one calendar year. The of parameter each month during operation. Thepermittee shao install, calibrate and maintain in permittee shall record in either a permanent bound logaccordance with the manufacturer's specifications. a book, or in readily accessible computer memories. theU 58 OSO 7 6otaging hour meter to monitor the total hours of monthly hours of operation of the generator and madeoperation per year for the generator N.J.A.C 7:27- available t6 the representatives of the Department of In Compliance Station Records No22.16(e) & [N.J.A.C 7:27-22.16(o)) Environrmental Protection upon request for a period of

True years after gre date of each record NIJ.A.C. 7-27-22.16(e) I. (N.J A C. 7:27-22.16(o))

Opacity 20 %, An emergency diesel generator that None. None.is located at a facility Orat generates electricity fromnuclear power and that is subject to regulation by treNuclear Regulatory Commission is exempt from theprovisions of N.J.A.C. 7:27-3. However, this exceptionfrom the applicability of this subchapter shat applyonly as folts/o:i. During a test mandated by the Nuclear Regulatorycommission; orit. During a period when off-site supply oa electricity isrot available due to causes outside the control of theowner or operator of the facility ard operation of thegenerator is needed for the protection of public health In Compliance Station Records Noor welfare.If these exemption periods do not apply, no personshall cause, suffer, allow or permit smoke greater than20% opacity. exclusive of visible condensed watervapor, to he emitted into tire outdoor air from the -combustorr of fuel in this unit except for a period of notlonger thar 10 consecutlive seconds. [N.J.A.C. 7:27-3.7(a)4]

ITSP -= 1.66 lIb/hr. Particulate emission limit from tre lNne. None.

U 58 OS 2 combustion of f1el based on rated heat inprto osource. In Compliance Station Records NoINJ.A.C 7:27-.4.2(a)] I I I

Page 74 of 80

Sect/on 6 -Compliance StatisPSVC Nrc,ýear t11C

I tope Creck anr-t lu Generating Shntiomn

Compliance Status Method to Is a ComplianceRef # Applicable Requirement Monitoring Requirement Recordtkeeptng Requirement (in Compliance Donterine Schedule CommentsNne-Copptiance) Compliance Attached? (YedNo)

Sulfur Content in Fuel - 0.3 % sulfur by weight. Suitur Content in Fuel: Monitored by review of fuel Sulfur Content in Fuel: Recordkeeping by fuelU 58 OSI 3 Maximum allowable sulfur content in fuel oil by fuel delivery records per delivery. )NJ.A.C. 7:27-22.16(o)] certification receipts per delivery showing sulfur In Corpiance Statn Records No5 3 pe/iscosity and geographical zone (Salem County). content. [N.J.A.C. 7:27-22.10(a)]INJA.C. 7:27- 9.2(b)iMaximum Gross Heat Input - 2.76 MMBTUIhr (HHV). Other. Fuel burner rated capacity(N J.A.C. 7:27- None.U 58 OSt 4 N.J.A.C. 7:27-22.16(a)] 22.16(a)],

In Compliance Station Records NoU 58 OSI 5 C0 = 2.94 Ibhrr, (NJA.C. 7:27-22.16(a)] None, None. In Compliance Station Records NoU 58 OSI 6 NOx (Total) = 13.64 ib/rr. [N.J.A.C. 7:27-22,16(a)) None. None. In Compliance Station Records NoU 58 OS1 7 VOC (Total) n- 1.09 lb/hr. [N.J.AC. 7:27-22,16(a)) Noue. None. In Compliance Station Records NoU 58 0SI 68 PM-1i (Total) - 0.97 lb/hr. {N.J.A.C. 7:27-22.16(a)] None. None. In Compliance Station Records NoU 58 OS1 g S02 = 0.9 btihr. [NJ.A.C. 7:27-22.13(a)] None. None. In Compliance Station Records NoU 58 OS1 1t TSP - 0.97 Ibrhr. (N.J.A.C. 7:27-22.16(a)] None. None. In Compliance Station Records NoHours of Operation n= 250 hr/yr. jN.J.A.C. 7:27- Hours of Operation: Monitored by houritime monitor Hours of Operation: Recordkeeping by manual logging22.16(a)] continuousiy. based on one calendar year, The of parameter each month during operation, The

permittee shao install calibrate and maintain in permittee shall record in either a permanent bound iogaccordance with the manufacturer's specifications, a book, or in readily accessible computer memories. theU 58 OS I 11 totaizing hour meter to monitor the total hours of monthly hours of operation of the generator and madeoperation per year for the generator N J.A C. 7:27- avaiiabie to the representatives of the Department of In Compliance Station Records No22.16(e) S. [N.J.A.C, 7:27-22.16(o)) Environmental Protection upon request for a period of

live years after the date of each record N.J.AC, 7:27-221 6(e) &. INJ.A.C. 7:27-22,16(o)]

Opacity = 20 %, exclusive of visible condensed None. None,U 70 OS0 1 .,water vapor, except for a period of not longer than 10consecutive seconds. Applies to PT70 thru pT74. In Compliance Station Records NoN.JA.C. 7.27- 3,5]

CO -= 1.029 torsryr. Annual emission limit based on CO: Monitored by hourfiime monitor continuously. CO: Recordikeeprig by manual logging of parameter orthe total operating time of 700 hourslyear combined for IN.J.A.C, 7:27-22.16(o)] storing data n a computer data system annualy.GO$ thru O5. [N.I.A.C. 7:27-22.16(a)) The CO ton per year value shall be calculated usingthe foltowing formula:(ToniYear) = (A ib/hr) x IS hrs/year) x (1 ton 12000 ib),where:U 70 OSO 2 A o Emission Factor (2.94 Wbihn) for CO as stated in In Compliance Station Records Nothis permit.B = Total Hours of operation of all five pumps asmeasured by hour/time monitor continuously) 0= 700hrs/yr. [N.J.A.C. 7:27-22.16(o)]

NOx (Total) = 4.774 tonslyr. Annual emission limit NOx (Total): Monitored by hour/time monitor NOx (Total): Recordkeeping by manual logging ofbased on the total operating time of 700 hours/year continuously. [N.J.A.C. 7:27-22.16(o)] parameter or storing data in a computer data systemcombined for OS1 thru OS5. (N JA.C. 7:27-22.16(a)) annually.

The NOx ton per year value shall be calculated usingthe following formula:

070 050 3 (Ton/Year) = (A lb/hr) x (B hCryear) x (1 ton 12000 Ib), In Compliance Station Records Nowhere:A = Emission Factor (13.64 -0 hr) for NOx as stated inhis permit.B = Total Hours of operation of all five pumps asmeasured by hour/time monitor continuously) -= 700_rslyr, IN.J.A.C. 7:27-22.16(O)1PM-t0 (Total) - 03395 tonstyr. Annual emission PM-10 (Total): Monitored by hour/time monitor . PM-10 (Total): Recordkeeping by manual logging oflimit based on the total operating lime of 700 continuously. [N.J.A.C. 7:27-22.16(o)) parameter or storing data in a computer data system

hourstyear combined for OS1 thru OS5 [N.J.A.C. 7:27- annually.22.16(a)]

The PMtO ton per year value shall be calculated usingthe following formula:Ton/Year) = (A lb/hr) x (B hrs/year) x (1 ton 12000 Ib),

U 70 OSO 4 where: In Compliance Station Records NoA 0 Emission Factor (0.97 IS/hr) for PMtO as stated inthis permit.B = Total Hours of operation of all five pumps asmeasured by hour/time monitor continuously) = 700hrsiyr. )N.J.A.C. 7:27-22.16(o))

.or 0

erFa R etatur eeteod to Is a CoaplaaRef # Applicable Requirement Monitoring Requirement Re-~rdkeepteg Requirement (In Co..pliance Determine Shetdule CommentsNoe-Comrplian-.) Compliance Attached? lYesINo)

S02 < 0.315 tons/yr. Annual emission limit based on S02: Monitored by hour/time monitor continuously S02: Recordkeeping by manual logging of parameterthe total operating time of 700 hourslyear combined for (N.J AC. 7:27-22 16(o)) or storing data in a computer data system annually.001 thru OS5 [NJ AC 7:27-22 16(a)] The S02 ton per year value shall be calculated using

the following formula:/Ton/Year) = (A lb/hr) x (B hb/year) x (1 ton / 2000 ib),where.U 70 OSO 5 A O mission Factor /0.0 lb/br) fot 002 as srated in In corny//anne Station Records Nothis permit. •B = Total Hours of operation of all five pumps asmeasured by hour/time moenior continuously) - 700his/yr. [N.J A.C. 727-22.16(o)]

TSP <= 0.3395 tons/yr Annual emission limit based ISP. Monitored by hour/time monitor continuously TSP: Recordkeeping by manual logging of parameteron the total operating time of 700 hourb/year Combined (NJ.AC. 7.27-22t16(o)j or storing data in a computer data system annually.for 0S1 thru OSS. [N.J A C. 7:27-22 16(a)] The TSP ton per year value shall be calcultoed using

t•le followang formula.

U 7q 60 /Ton/Yea) = (A lb/hr) x 0 hrs/year) x(t ton / 2000 /b), In Compliance Station Records Nowhere:A = Emission Factor (0 97 lb/hi) for TSP as stated inthis permit.B = Total Hours of operation of a/l five pumps asmeasured by hour/time monilor continuously) < 700his/yr. )N.J.A.C. 7:27-22.16(o)]

VOC (Total) <0=3815tons/yr. Annual emission limit VOC (Total): Monitored by hourltime monitor VOC (Total): Recordkeeping by manual logging ofbased on the total operating time of 700 hoursyear continuously. [N.J.A.C. 7:27-22.16(o)] parameter or storing data in a computer data systemcombined for 0S1 thru OS5. [NJA C. 7:27-22 16(a)] annually.The VOC ton per year value shall be calculated usingthe following formula.

U70 OS0 7 (Ton/Year) = (A lb/hr) x (B hri/year) x (1 ton 12000 /b), In Compliance Station Records Nowhere.

A = Emission Factor (1.09 lbhir) for VOC as stated inthis permit.B = Total Hours of operation of all five pumps asmeasured by hourriime monitor continuously) - 700birsyr. IN JA C. 7:27-22 16(o))

Hours of Operaton 0=700 hr/yr total combined hours Hours of Operation: Monitored by hoeurtime monitor Hours of Operation Recordkeeping by manual loggingOf operation for five pumps tinder OS Ithru OS5 continuously. based on one calendar year. The of parameter each month during operation. The[NJ AAC. 7:27-22.16(a)] permittee shall install. calibrate and maintain in permittee shall record the monthly and year-to-dateU 70 OSO accordance with the manufacturer's specifications. a hours of operation of each mobile diesel pump in either In Compliance Stat/on Records Noolalizing how meter on each mobile diesel pump to a /og book, or readily accessible computer memories.

monitor the total hours of operation. [NJA.C;7.27- )N.JA.C 7:27-22.16(o))22.16(o))

U 70 OS1 1 TSP -= 1.66 lb/hr. )N.J.A.C. 7:27- 4.2)a)) None, None. In Compliance Slabor Records NoSulour Content in Fuel - 0.3 %. [N.JA.C. 7:27- 9.2(b)] Sulfur Content in Fuel. Monitored by review of fuel Sulfur Content in Fuel. Recordkeepiog by buelU 70 0S1 2 delivery records per delivery. [NJA.C 7:27-22.16(o)] certifoiation receipts per delivery showing suifur In Compliance Station Records Nocontent [N.J.A.C. 7:27-22.16(o)l

Maximum Gross Heat Input -= 2.76 MMBTU/hr (HHV). Other: Fuel burner rated capacfty[N.J.A C. 7:27- None.70 OS1 3 N JA.C. 7:27-22,16(6) " 22A16a)]. In Compliance Station Records No

U 70 OS1 4 CO = 2.04 lb/hr. [N.J.A.C. 7:27-22.16/a)) None None. In Compliance Station Records NoU 70 OSi 5 NOx (Total) <- 13.64 Ib/hr. [NJ A.C. 7:27-22.16(a)] None, None. In Compliance Station Records NoU 70 001 6 PM-10 (Total) = 0.07 lb/hr. [N.J.A.C. 7:27-22.16(a)) None. None. In Compliance Station Records NoU,70 OS1 -7 S02 -= 0.T9 b/h. N.J.A.C. 7:27-22.16(a)) None. None. In Compliance Station Records NoU 70 OS1 8 TSP<= 0.97 lb/hi. [N.J A.C. 7:27-22.16(a)) Nonem None, In Compliance Station Records NoU 70 OS1 9 VOC (Total) <= 1.09 Ib/hr. [N.J.A.C. 7.27-22.16(a)) None. None. In Compliance Station Records NoU 70 001 10 2-2.10(a))}

In Compliance .Station Records NoU 70 OS1 10 j:uel type limited to # 2 diesel oil only. [N.JA.C. 7:27-InCmlac Stio ers N

U 70 OS2 • 1 TSP - 1.66 lb/hr. [N.J.A.C. 7:27- 4 2(a)] None None. In Compliance Station Records No-Sulfur Content in Fuel 0= 0.3 %. )N.J.A.C. 7.27- 902(b)) Sulfur Content in Fuel: Monitored by review of fuel Sulfur Content in Fuel: Recordkeeping by fuelU 70 082 .2 delivery records per delivery. [NJ A.C 7:27-22 16(o)) coerification receipts per delivery showing sulfur In Compliance. Station Records Nocontent [N.J.AC. 7:27-22 16(o)]Maximum Gross Heat Input = 2.76 MMBTUihr (HHV). Other: Fuel burner rated capacfty[N.J .A.C 7:27- None.0 70 002 3 /NJAC 7:27-22.16/a)) 22.10(a)). I opine SainPcrs N

U 70 002 4 CO - 2.94 /b/hr. [N.J.A.C, 7:27-22.16(a)] None. None. In Compliance Station Records NoU 70 OS2 5 NOx (Total) - 1364 /b/hr. (N.J.A.C. 7:27-22.16(a)) None. None. In Compliance Station Records No

Page 76 of o0

Section 6 - C(nnpliaeoe StaWtsP hS E C N u ea r N I , ,C

lo p e Cr n- k an d SA -le m Gn3 r ating S tstir

I Compliance Status Moiarbd to Is a ComplianceRef # Applicable Requirement Monitoring Requirement Recordkeeplog Requirement (In Compliance Determine Schedule CommentsNon-Cornpliance) Ctompliance [ Attached? (Yes/NO) ]

U6 PM-1 (Total) 7 0 0097 Ib/hr [N.JA,C. 7:27-22,16(a)] None. None, In Compliance Station Records NoU 70 O S 2 7 S 0 2 < = 0 .9 0 b/h r. [N.J A .C 7:2 7 -2 2 16 (a )] N one. N o ne , In C o m p lia n ce S ta tio n R e co rds N oU 70 OS2 a TSP -=0 97 lb/hr. (NJ A.C 7.27-22,16(a)] None. .None In Compliance Station Records NoUF70 OS2 9 VOC (Total) - 1 o09 tb/hr. [N J.A,C .7:27-22A16(a)] None. None, In Compliance Station Records NoU 70 OS2 10 type limited to2 # 2 diesel .i1 only. N.J.A.C, 7.27- In Compliance Station Records No

U 70 OS3 1 TSP -= 1,66 lb/hr. [N.J A C. 7:27- 4 .2(a)] None. None In Compliance Station Records NoSulfur Content in Fuel = 0 3 %. [N.J A,C 7:27- 9.2(b)) Sulftor Content in Fuel: Monitored by review of fuel Sulfur Content in Fuet Recordkeeping by fuelU 70 OS3 2 delivery records per delivery [N.JA C. 7:27-22 16(o)0 certification receipts per delivery showing sulfur In Compliance Station Records NoU 7T OS3 3 Maximum Gross Heat input = 2.76 MMBTU/hr (HHV)/ Other: Fuel burner rated capacity(N J.A C. 7:27- None to Compliance Station Records No_ UN .J.AX C 7:27-22 ,16(a)] 22,16 a)]U 70 OS3 4 CO - 2 94 lb/hr, [N.J.A C. 7.27-22.16(a)j None. None. In Compliance Station Reo rds NoU 70 OS3 5 NOx (Total) -= 13.64 0b/hr. (N.J AC. 7:27-22 16(a)) None. None. In Compliance Station Records NoU 70 OS3 6 PM-10 (Total) - 0.97 1b/hr (NJ A C .7:27-22.16(a)] None None In Compliance Sieben Records NoU 70 OS3 7 S02 - 0=9 b1/hr. (N JA.C. 7:27-22.16(a)] None. None. In Compliance Station Records NoU 70 OS3 8 TSP -= 097 lb/hr. (N.J A.C. 7:27-22 16(a)] None. None In Compliance Station Records NoU 70 OS3 9 VOC (Total) -= 109 6b/hr. [N.J A C. 7:27-22.16(a)] None. Noneo In Compliance Station Records NoU 70 OS3 t 22,16(a)]

In Compliance Station Records NoU 70 0S4 1 TSP - 1t66 6b/hr [N,J A,C. 7:27- 4.2(a)] None.

toone In Compliance Station Records NoSulfur Content in Fuet n = 0.3 % N.J AC, 7 :27- 92(b)] Suifor Content in Fuel: Monitored by review of fuel Sulfur Content in Fuel: Recordikeeping by fuelU 70 OS4 2 delivery records per delivery. (N.J.A.C. 7:27-22 ,16)o)] .certification receipts per delivery showing su0fur In Compliance Station Records Nocontent. [N.J.A C 7:27-22,16(o))

Maximum Gross Heat Input -=2 76 MMBTU/hr (HHV). Other: Fuel burner rated capacty[N J.A,C 7:27- None.-- - IU 70 OS4 3 IN JA C. 7 27-22,16(a)] 22.16(a)] Io Compliance Station Records NoU 70 OS4 4 CO = 2,94 b/hr. [N.J.A C. 7:27-22.16(a)) None. None In Compliance Station Records NoU 70 OS4 5 NOx (Total) -= 13.64 lb/hr [N.J A.C .7:27-22.16(a)] N None.

In Compliance Station Records NoU 70 OS4 6 PM-10 (Total) - 0.97 lb/hr. [N.J.A.C. 7:27-22.t6(a)] None. None In Compliance Station Records NoU 70 OS4 7 S02 - 0.9 1b/hr. ]N.J.AC. 7.27-22.16)a)] None. None In Compliance Station Records NoU 70 OS4 8 TSP = 0097 lb/hr. [N JA C. 7:27-22.16(a)] None . None In Compliance Station Records NoU 70 OS4 9 VOC (Total) -= 1.09 lb/hr, (N.J.A.C. 7:27-22.16(a)) NoneNoneý In Compliance Station Records No

U 7 0 0 0 4 1 0 2 2 .1 6 (a )] In C o m p lia n c e S ta tio n R e co rd s

U 70 OS5 1 TSP <- 1,66 lb/hr. [N.J.A C. 7.27- 4.2(1)] None. None, In Compliance Station Records NoSulfur Content in Fuel n 0.3 % [N.J A C, 7:27- 9.2(b)] Sulfur Content in Fuel Monitored by review of fuel Sulfur Content in Fuel: Recordkeeping by fuelU 70 OS5 2 delivery records per delivery, [N.J.A.C 7:27-22,16(o)] certification receipts per delivery showing sulfur In Compliance Station Records Nocontent [N J.A.C. 7:27-22 16(o)]70 099 3 Maximum Gross Heat Input = 2,76 MMBTU/hr (NHV). Other. Fuel burner rated cpacity]N J.A.C. 7:27- None, In Campliance Station Recorda No3~ NJAC. 7:27-22,101a1] 22.100~lU 70 OS5 4 CO = 2.94 tb/hr. [N.J.A.C. 7:27-22.16(a)] None. None, In Compliance Station Records NoU 70 OS5 5 NOx (Total) 0- 1364 Is/hr. (N.J.A.C. 7.27-22.16(a)] Noire, None, In Compliance Station Records NoU 70 OS5 6 PM-10 (Total) - 0.97 (b/hr. (N.J.A.C .7.27-22.16(a)] None. None. In Compliance Station Records NoU 70 OS5 7 S02 0= 09 1b/hr. [N.JA.C. 7:27-22.16(a)] None. None. In Compliance Station Records NoU 70 05 8 TSP- 0=.97 lb/hr [N.JA.C 7:27-22.16(a)] None. None. In Complionce Station Records NoU 70 OS5 9 VOC (Total) - 1.09 lb/hr. (N.J A.C 7:27-22.16(a)] None. None. In Compliance Station Records NoU 70 OS5 10 Fuel type limited to # 2 diesel oil only, ]N J.A.C, 7:27-

In Compliance Station Records NoU 120 OSO 1 TSP - 0,60 1b /hr. Applies to each pump (OS1 - "Noie. None In Compliance Station Records NoOS3). [N.J.AC. 7:27- 4.21a)1

Sulfur Content in Fuel -= 0.3 %. Applies to each Sulfur Content in Fuel: Monitored by review of fuel Sulfur Conteit in Fuel: Recordkeeping by fuelU 120 OSO 2 pump (OS1 - OS3), [N JA C. 7:27- 9.2(b)] delivery records per delivery, N J.A.C. 7:27-22.16(o)0 certification receipts per delivery showing sulfur In Compliance Station Records Nocontent. [N J.A.C. 7:27-22,16(a)]

CO = 0,47 tons/yr. Annual emission limit based on None. None.U 120 000 3 the total operating time of 900 hours/year combined for

In Compliance Station Records NoOS1 through OS3 [NJ.A C 7:27-22 16(a))

NOx (Total) -= 2,17 tons/yr. Annual emission limit None, None.U 120 OS0 4 based on the total operating time of 900 hours/year

In Compliance Station Records Nocombined for OST through OS3. [N J.A C. 7:27-

. '80 0

C Setion 6 Simi',1-1917,01C

,,,I S'l-, (3--ating Si

Complian.e Status Mthod to to a Corol.lanc.Ref # Applicable Requirement Monitoring Requirement Recordlreeping Requirement Cino pliance Ate" Dethe Suhedstlet Commentst

Nn-Crompliance) Corrpliance Aftzihed7 (Y.sN,)

PM-10 (Total) -= 0 15 lonslyr Annual emission limit None. None.

U 120 OSO 5 based on the total operating time of 900 hours/year tn Coempliaece Station Records Nocombined for OS1 through OS3 IRNJ.A,C 7:27-

0S2 = 0 04 tooslyr, Annual emission limit based on None, None.

U 120 O$0 6 the total operating time of 900 hourn/year combined for In Compliance Station Records No0S1 thrtough OS3 [N.J.A.C. 7:27-22,16(al)

TSP - 0.15 tonslyr. Annual emission limit based 0n Norre, None.

U 120 OSO 7 the total operating time of 900 hourslyear combined forOST through OS3. [N.J.AC. 7:27-22.16(a)) In compliance Station Records No

VOC ITotal) - 0 18 tonstyr. Annual emission limit None. ftonebased on the total operating time of 900 hourstyear I

U 120 OSO combined for 0S1 through OS3, [N.J.A.C 727- In Compliaece Station Records No22 16(a)]

Maximum Gross Heat Input < 1.1 MMSTUIhr (HHV) Other: Fuel burner rated capac•y[N J.A.C. 7:27- None.U 120 OSO 9 Applies to each pump (OS1 - OS3) [N.J.A.C. 7.27- 22.16(a)]. In Compliance Station Records No

22.16(a))

Hours of Operation - 900 hrlyr total combired hours Hours of Operation: Monitored by hour/linre monitor Hours of Operation: Recordkeeping by manual loggingof operation for OS1 through OS3 IN J.A C. 7:27- continuously, based on one calendar year. The of parameter each month during operation The22.16(a) petrmittee shall irosall, calibrate and maintain in permittee shall record in either a permanent bound log

accordance with the manufacturer's specifications: a bohk, or in readily accessible computer memories, the

U 120 OSS 10 totalizing hour meter to monitor the total hours of monthly hours of operation of the generator and made In Compliance Station Records Nooperation per year for the generator. N J A.C. 7.27- available to the representatives of the Department of22,16(o)] . onvironmental Protection upon request for a period of

hive years after the date of each record. [N.J A C 7:27-22 16(o)]

CJO o= 1.04 lblhr applies to eachpump 1OS1 - OS3) None. NoneU 120 OS 11 - N.J.A.C 7:27-22.16(a)] . In Compliance Station Records No

1 NOn (Total) <- 482 Sb/hr applies to each pump (OS1 - None. None.U 120 OS0 12 0S3). (NJ A.C. 7.27*-22.th()]) - . In Compliance Station Records No

PM-10 (Total) - 0,34 lbtr applies to each pump (0S1 None. NtineorU 120 OS0 13 -OS3). [N J.A.C. 7:27-22.16(a)] In Compliance Station Records No

.02 <y 0,1 bhhr applies to each pump (OSt -OS3) None. None,U 120 OS0 14 [N.J.A. 7:27-22,11ha)] In Compliance Station Records No

- TSP -= 534 Ibnh( applies to each pump (0s1 - 0S3) None. NoneU 120 0SO 15 [N.J.AC 7:27-22!6(a)l If Compliarnce . Station Records No

120 050 1 VOC 0Total) - 0.39 5b/hr applies to each pump (OS1 - None None. It Compliance Statioe Records No12 S 6 003). )N.JA C. 7:27-22.16(a)) •-nCmla~e SainRcrs- N

The engines shall have been manufactured prior to None. Necordlreeping by manual logging of paranmeter orApril 1,2006 and shreli not have beert modified or storiog data in a computer data system once initially-reconstructed as per 40 CFR 60 14 and 40 CFR 0nd prior to permit renewal of certifed copies of tfe60.15, after July 1, 2005. date of manufacture of each of the engines. the

Applicable to OS2 through OS19 [NN J A.C 7:27- manufacturer's specification of each of the engioes22.16(a)] with the serial number, the make, the model the -

capacity. the emission limits of pollutants from theU 120 i OS0 17 engines, the date when brought on site and the date

removed from site. and the date of any modificationor e Compliance Station Records Noreconstruction of the engines Certification should beas per N.J A.C 7:27-1:39,All records should be kept on site for a minimum of 5years from the date of record and made available tothe representatives of the Department and USEPA"ponerequest. [NJ AC. 7:27-22.16(o))

U 130 000 I 1tSP = 6.44 lbllr. [N.J.A.C. 7:27- 4,2(a)] NNone. orne. In Compliance Station Records No

Pege 78 of 60

hection 6- Compliance StatusPSEG Nu'km TIC

Hope Creek and Salemi Generating Stalionk

I I'Compliance Status Method to In . ComplaienoRef # Applicable Requirement Monitoring Requirement Renordkeeplng Requirement (In Compliance Detiermine Schedule CommentsNon-Compliance) Compliance Attached? (yesillo)

Opacity nn 20 %. An emergency diesel generator that None. None,is located at a facility that generates electricity fromnuclear power and that is subject to regulation by theNuclear Regulatory Commission is exempt from theprovisions of NJ.A.C. 7:27-3. However, this exceptionfrom the applicability of this subchapter shall applyonly as follonns:

o During a test mandated by the Nuclear RegulatoryCommission; orii. During a period when off-site supply of electricity isnot available due to causes outside the control of theowner or operator of the facility and operation of the

U 130 OS0 2 generator is needed for the protection of public health hnmolione Station Records Noor wafare.

If these exemption periods do not apply, no personshall cnose, suffer, allow or permit smoke greater than20% opacity. exclusive of visible condensed watervayor, to be emitted into the ouldoor air from thenombustion of fuel in this unit except for a period of notlonger than 10 consecutive seconds (N.JA C. 7:27-3 7(a)4]

U 130 OS0 3 CO on 4.47 tonstyr. N.J.A.C. 7:27-22.16(a)) None None. In Compliance Station Records NoU 130 OS0 4 NOx (Total) - 3,6 tonslyr. [N.J.AC, 7:27-22.16(a)) None, None. In Compliance Station Records NoU 130 0O0 5 PM-10 (Total) -n 021 tonslyr. (N.J.A.C. 7:27-22.16(a)] None None. In Compliance Station Records NoU 130 OSO 6 SO2 = 0.18 Ionslyr. [N.J.A.C. 7•27-22.16(a)] N None None. In Compliance Station Records NoU 130 OSO 7 TSP = 0 21 tonslyr. IN.J.A.C. 7:27-22.16(a)) None None. In Compliance Station Records NoU 130 OS0 8. VOC (Total) = 0005 toos/yr. [N.J.A.C. 7:27-22,16(a)) None None, In Compliance Station Records NoMaximum Gross Heat Input on 12,2 MMBTU/hr (HHV) Other: Fuel burner rated capacity[N.J.AC 7:27- Maximum Gross Heat Input: Recordkeeping by manualU 130 Oo g N.J.A C. 7:

2 7-2 2

.16(a)) 22.16(a)] togging of parameter or storing data in a computer datasystem at the approved frequency. (None) In Compliance StaTion Records No

Hours of Operation 00.100 hr/yr [N.J.A.C. 7T27- Hours of Operation: Monitored by heourtime mrritor Hours of Operation: Recordkeepiog by manual logging22.16(a)] continrously, based on one calendar year. The of parameter or storing data in a computer data systempermitlee shall install. calibrate and maintain in each month during operationaccordance with the manufacturer's specifications, a (a) The owner or operator of an emergency generatortotalizing hour meter to monitor the total hours of shall maintain on site and record in a logbook oroperation per year for the generator. [N.J.A.C. 7:27- computer data system, the following information:22.16(o)]

1. Once per month, the total operating time from tgegenerator's hour meter,

2. For each time the emergency generator isspecifically operated for testing or maintenance:

i. The reason for its operation;ii The dafeas) of operation and the startup and

shut down fime:1ii The total operating time for testing orU130 000 10

maintenance based on the generator's hour meter; and to Compliance Statin Records Noiv The name of the operator; and

3. If voltage reduction is the reason for the use of theemergency generator, a copy of the voltage reductionnotification from PJM or other documentation of thevoltage reduction .

(b) The owner or operator of an emergency generatorshall maintain the records under (a) above for a periodof no less than five years after the record was madeand shall make the records readily available to theDepartment or the EPA upon request. [N.J.A.C. 7:27-_________________________________ ________________________________ 22100))___________

__________2.16(o)______

.f010

ientiori6-1 B ,eStat,.,JiriC jilAC

I tope Crank arvd Sotrl Generirng Stftinrrs

Compliance Statos Method to IFsa ComplianeRef # Applicable Requirement Monitoring Requirement Recordkeeping Requirement (In Comipliance Determine Schedule Comments

Non.Compliance) Compliance Attached? (YesINo)

fie engine shall have been maiufactured prior to April None, Recordkeeping by manual logging of parameter or1,200., and shall not have been modified or storing data in a comrputer data system once initiallyrecoensructed as per 40 CFR 60,14 and 40 CFR and prior to permit renewal of certified copies of the60d 5, after July 1f, 2005, date of nanufacthrre of the engine, the manufacturer'sApplicable Io OS2 through OS19t [N J.A.C. 7.27- specification of tpe engine Wili the serial number, the22. 16(a)] make: the model, the capacity, the enission limits of

pollutaants from the engine, the date whnen brought onsite and the date removed from site. and the date of

U 130 OSO 11 any modnfication om reconstruction of tire engine. In Compliance Station Records No

Certification should be as per N.J.A.C. 7:27-1:39All records should be kept on site for a minimum of 5years from the date of record and made available tothe iepresentatuves of the Department and USEPAupon request. tN.J AC. 7 27-22l16(o))

Sulfur Conrtent in Fuel <= 0.3 %. IN.J.A.C. 7:27- 9.21b)) Sulfur Content in Fuel: Monitored by reviewv of fuel Sulfur Contendt i Fuel: Recordkeeping by fuelU 130 OSO 12 delivery records per delivery. [NJA.C. 7:27-22.16(o)) certirication receipts per delivery showing sulfur In Compliance Station Records Fl

content. [N.A.A.C. 7:27-22.16(o)!

U 130 OS 1 CO -= 89,32 ilb/hr. [N.J.A.C. 7:27-22.16(a)] None. None. In Compliance Station Records No

U 130 OS1 2 NOx (Total) v 72.08 tbrr. [N.J.A.C. 7:27-22.f6(alj None. None In Compliance Station Records NoU 130 OS1 3 PM-10 (Total) -= 4.23 Ibfh. [N.J.A.C. 7:27-22.16(a)) None. None. In Compliance Station Records NoU 130 0S1 4 S02 -= 3.68 Ib!hr. [N.J.A.C. 7:27-22.16(a)l None. rlene. In Compliance Station Records NoU 130 OS1 5 TSP -= 4.23 hb/hr. (NJ.A.C. 7:27-22.16(a)] None. None. In Compliance Station Records NoU 130 OSt 6 V0C(Total) -= 1.00 lb/hr. [N.J.AC. 7:27.22.16(a)] None.. None, In Compliance Statien Records NoU 130 OS1 7 FTSP = 4.23 [b/hr. N. J.A.C. 7:27-22.f6(a)1 No-e. None. In Compliance Oration Recoids NeU 130 OS1 8 VOC (Total) -= 1.09 lb/hr. (tN..A.C. 7:27.22.16(a)] Nore. None. In Compliance Station Records No

Page 80 of BO

Section 7 - Potential to EmitPSEG Fossil LLC

Hope Creek and Salem Generating Stations

Allowable Emissions (tons/yr)

Year NOx VOC

1 422 13.062 431.67 13.063 431.67 13.064 453.46 13.065 453.46 13.06

Potential vs Actual NOx Emissions

Year PTE (NOx) (NOx)

PIE (N I Actual1 422 54.572 431.67 58.313 431.67 53.984 453.46 40.605 453.46 54.76

Potential V§ Actual VOC Emissions

Year PIE (VOC) 1ActualYear I PTE IVOC (VOC)

1 13.06 0.102 13.06 0.023 13.06 0.004 13.06 0.025 1 13.06 0.00

1 of 1

Section 7Facility Wide TrendsPSEG Nuclear LLC

Hope Creek and Salem Generating Stations

5-Year Trend Allowable Emissions

500 - -

•,300

1 2 3 4

4 NOx -3-VOC Year

5

f 5-Year Trend Potential vs Actual NOxEmissions

500

400 .1;,•

0200

1 2

--- #, Potential - ActuaI

34 5

Year

5-Year Trend Potential vsEmissions

Actual VOC

0

14

12

10

8

6

4

2

0

1 2

1- Potential - ActualI

3 4 5

Year

1 of 1

Section 7Changes to Emissions for Emission Units

PSEG Nuclear LLC

Hope Creek and Salem Generating Stations

NOx Potential and Actual Emissions (tonsgyr)

Emission Unit Year 1 Year 2 Year 3 ] Year 4 Year 5

Potential N/A N/A N/A N/A N/AActual N/A N/A N/A N/A N/A

Potential 99.10 99.10 99.10 99.10 99.10Actual 20.32 15.47 15.08 14.03 26.08

Potential 47.30 47.30 47.30 47.30 47.30Actual 14.33 16.47 19.36 10.53 Did Not Operate

U19 Potential N/A N/A N/A N/A N/AActual N/A N/A N/A N/A N/A

Potential N/A N/A N/A N/A N/A

U24 oetal NA NA N/2/ /Actual N/A N/A N/A N/A N/A

Potential N/A N/A N/A N/A N/AActual N/A N/A N/A N/A N/A

Potential N/A N/A N/A N/A N/AActual N/A N/A N/A N/A N/A

Potential N/A N/A N/A N/A N/AActual N/A N/A N/A N/A N/A

Potential N/A N/A N/A N/A N/AU5Actual N/A N/A N/A N/A N/A

Potential N/A 9.67 9.67 9.67 9.67U36 Actual N/A 0.21 0.00 0.18 0.08

U37 Potential 26.40 26.40 26.40 26.40 26.40Actual 0.48 1.50 0.07 0.02 0.03

Potential 192.38 192.38 192.38 192.38 192.38Actual 7.10 2.80 0.44 0.76 0.33

U40 Potential 30.06 30.06 30.06 30.06 30.06Actual 11.99 11.01 15.07 12.38 13.68

Potential N/A N/A N/A N/A N/AActual N/A N/A N/A N/A N/A

Potential N/A N/A N/A N/A N/AActual N/A N/A N/A N/A N/A

Potential 7.00 7.00 7.00 7.87 7.87Actual 0.24 8.30 0.96 0.01 0.42

Potential N/A N/A N/A N/A N/AActual N/A N/A N/A N/A N/A

U45 Potential N/A N/A N/A N/A N/AActual N/A N/A N/A N/A N/A

Potential N/A N/A N/A N/A N/AActual N/A N/A N/A N/A N/A

U47 Potential 19.76 19.76 19.76 20.08 20.08Actual 0.11 2.55 3.00 2.69 5.37

U49 Potential N/A N/A N/A N/A N/A.Actual N/A N/A N/A N/A N/A

Potential N/A N/A N/A N/A N/AActual N/A N/A N/A N/A N/A

Potential N/A N/A N/A N/A N/AActual N/A N/A N/A N/A N/A

Potential N/A N/A N/A N/A N/AActual N/A N/A N/A N/A N/A

Potential N/A N/A N/A 20.60 20.60Actual N/A N/A N/A 0.00 8.77

U57 Potential N/A N/A N/A N/A N/AActual N/A N/A N/A N/A N/A

Potential N/A N/A N/A N/A N/AU58 Ata / / / / /Actual N/A N/A N/A N/A N/A

Potential N/A N/A N/A N/A N/AActual N/A N/A N/A N/A N/A

Potential N/A N/A N/A N/A N/AActual N/A N/A N/A N/A N/A

U10Potenti~al N/A N/A N/A N/A N/AAcua NA NA N/A N/A N/A

Potential 422.00 431.67 431.67 453.46 453.46Ta Actual 54.57 58.31 53.98 40.60 54.76

Potential NA 9.67 0.00 21.79 0.00N Ch Actual NA 3.74 -4.33 -13.38 14.16

N/A = Not Applicable I of 2

Section 7Changes to Emissions for Emission Units

PSEG Nuclear LLCHope Creek and Salem Generating Stations

VOC Potential and Actual Emissions (tonsiyr).

Emission Unit Year 1 Year 2 Year 3 Year 4 ] Year 5

Potential N/A N/A N/A N/A N/A

UlActual N/A N/A N/A N/A N/AU1Potential N/A NA N/A N/A NA

Actual N/A N/A N/A N/A N/A

Potential N/A N/A N/A N/A N/AActual N/A N/A N/A N/A N/A

Potential N/A N/A N/A N/A N/AUOActual N/A N/A N/A N/A N/A

U22 Potential N/A N/A N/A N/A N/AActual N/A N/A N/A N/A N/A

Potential N/A N/A N/A N/A N/A

U33 Potential N/A N/A N/A N/A N/AActual N/A N/A N/A N/A N/A

Potential N/A N/A N/A N/A N/AActual N/A N/A N/A N/A N/A

Potential N/A N/A N/A N/A N/A

U3 6 Actual N/A N/A N/A N/A N/AU37 Potential N/A N/A N/A N/A N/A

Actual N/A N/A N/A N/A N/A

U7Potential N/A N/A N/A N/A N/A*Actual N/A N/A N/A N/A N/A

U39 Potential 13.06 13.06 13.06 13.06 13.06Actual 0.10 0.02 0.00 0.02 0.00

U40 Potential N/A N/A N/A N/A N/AActual N/A N/A N/A N/A N/A

Potential N/A N/A N/A N/A N/A

Actual N/A N/A N/A N/A N/A

U42 Potential N/A N/A N/A N/A N/AActual N/A N/A N/A N/A N/A

Potential N/A N/A N/A N/A N/A

U4Potential N/A N/A N/A N/A N/AU5Actual N/A N/A N/A N/A N/A

UPotential N/A N/A N/A N/A N/AActual N/A N/A N/A N/A N/A

Potential N/A N/A N/A N/A N/AActual N/A N/A N/A. N/A N/A

Potential N/A N/A N/A N/A N/AU4Actual NA N/A N/A N/A

Potential N/A N/A N/A N/A N/A

UIActual N/A N/A N/A N/A . N/APotential N/A N/A N/A N/A N/A

U3Actual N/A N/A N/A N/A N/AUPotential N/A N/A N/A N/A N/A

Actual N/A N/A N/A N/A N/A

Potential N/A N/A N/A N/A N/AActual N/A N/A N/A N/A N/A

Potential N/A N/A N/A N/A N/AActual N/A N/A N/A N/A N/A

Potential N/A N/A N/A N/A N/AActual N/A N/A N/A N/A N/A

Potential N/A N/A N/A N/A N/A

Actual N/A N/A N/A N/A N/A

Potential N/A N/A N/A N/A N/AActual N/A N/A N/A N/A N/A

U10 Potential N/A N/A N/A N/A N/AActuall N/A N/A N/A • N/A N/A

Potential1306 13.06 13.06 13.06 13.06Totals Actual 0.10 002 0.00 0.02 0N00

Potential NA 0.00 0.00 0.00 0.00E Actual -0.08 -0.02/ 0.02 -0.02

N/A = Not Applicable 2 of 2

Section 7Changes to Insignificant Source Emissions

PSEG Nuclear LLCHope Creek and Salem Genera ting Stations

[_ 1 _Y 1 NOx Potential and Actual Emissions (tons/yr)I Year 1 Year 2 Year 3 Year 4 Year 5 _

Potential 2.54 2.54 2.54 2.54 2.54Actual 0.39 0.39 0.39 0.39 0.39

Potential NA 0.00 0.00 0.00 0.00Net Change Actualf NA 0.00 0.00 0.00 0.00

VOC Potential and Actual Emissions (tons/yr)

Year I Year 2 Year 3 Year 4 Year 5

Totals Potential 0.21 0.21 0.21 0.21 0.21Actual 0.00 0.00 0.00 0.00 0.00

Net Chane _Ptential 0.00 0.00 0.00 0.00 0.00Potential NA 0.00 0.00 0.00 0.00Net___Change_ Actual* NA 0.00 0.00 J 0.00 0.00

0

1 of 1

Section 7Changes to Fugitive Emissions

PSEG Nuclear LLCHope Creek and Salem Generating Stations

NOx Actual Emissions (tons/yr)Year 1 Year 2 Year 3 Year 4 Year 5

Total Actual 0.00 0.00 0.00 0.00 0.00

Net Change Actuall NA 1 0.00 [ 0.00 0.00 1 0.00

VOC Actual Emissions (tons/yr)Year 1 Year 2 1 Year 3 Year 4 Year 5

Total Actual 1.88 1.73 1.76 1.85 1.85

Net Change I Actual NA -0.15 0.03 1 0.09 1 0.00

0

0

1 of I

Section 7Emissions in Pound per Unit Product Basis

PSEG Nuclear LLCHope Creek and Salem Generating Stations

I ~Actual Emissions (IbsA/IW-hr)Air Contaminant Year 1 Year 2 .Year 3 Year 4 Year 5

[Net Generation (MW-hr) 24,313,091 22,162,993 25,752,121 27,727,317 26,893,213NOx (lbs/MW-hr) 4.5E-03 5.3E-03 4.2E-03 2.9E-03 4.1E-03VOC (lbs/MW-hr) 8.2E-06 1.E-06 0.0E+00 1.4E-06 0.0E+00

Net Change Year 1 and 2 J'Year 2 and 3 Year 3 and 4 Year 4 and 5

Net Generation (MW-hr) -2150098 3589128 1975196 -83M104NOx (lbs/MW-hr) 7.73E-04 -1.07E-03 -1.26E-03 1.14E-03VOC (lbs/MW-hr) -6.42E-06 -1.80E-06 1.44E-06 -1.44E-06

5-Year Trend: Actual Emissions per MW-hr Generation

6.0E-03 30,000,000

5.0E-03 • < 25,000,000

4.OE-03 20,000,000

3.OE-03 15,000,000

" 2.OE-03 10,000,000

1.OE-03 5,000,000 "

< 0.OE+00 , 0

Year 1 Year 2 Year 3 Year 4 Year 5

VOC -- NOx : ,: - Net Generation

1 of 1

ATTACHMENT 2

Administrative Consent Order

0

0

1*taxtr of New~ 3rsrijDEPARTMENT OF ENVIRONMENTAL PROTECTION

Air Compliance & EnforcementSouthern Regional Office

2 Riverside Drive, Suite 20 LCamden. New Jersey 08103

Telephone: (856) 614-3601 Fax: (856) 614-3613

0LISA P. JACKSO

Commissioner

JON S. CORZINEGovernor

IN THE MATTER OF ADMINISTRATIVECONSENT ORDER

PSE&G NUCLEAR LLCPO Box 236- M/C N21Hancocks Bridge, NJ 08038

EA ID # NEA080002 - 65500,

This Administrative Consent Order ("ACO") is entered into pursuant to the authority vested in theCommissioner of the New Jersey Department of Environmental Protection ("Department") byN.J.S.A. 13:1D-I et seq., and the Air Pollution Control Act, N.J.S.A. 26:2Cr1 et seq. (the "Act"),and duly delegated to the Manager, Southern Regional Office of Air Compliance & Enforcementpursuant to N.J.S.A. 13:1 B-4.

FINDINGS

I. PSEG NUCLEAR LLC owns and/or operates a facility located at Alloway Creek Neck Road,Block 26 and Lots 4, 4.01, 5, 5.01 Lower Alloway Creek Township, County of Salem, State ofNew Jersey (ID# 65500).

2. PSE&G NUCLEAR LLC owns and operates two emergency engines (Subject items U33 -Guardhouse Standby Diesel Generator and U35 - Scania Diesel Fire Pump) under their currentOperating Permit, BOP050003-65500.

3. As the result of a self disclosure made on May 21, 2008, the Department has determined thatPSE&G NUCLEAR LLC failed to comply with applicable requirements as follows:

A. Requirement: Pursuant to N.J.A.C. 7:27-22.3(e), a permittee shall ensure that allrequirements of the operating permit are met. [N.J.A.C. 7:27-22.3(e)]

Description of Noncompliance: You failed to ensure that all requirements of the operatingpermit are met. Specifically, you operated two emergency engines: U33, GuardhouseStandby Diesel Generator and U35, Scania Diesel Fire Pump with incorrect hourly andannual emission limits.

0

,vt~w Jer.ev 1< in Equal Oppatuah.~ Am~loi~r ~ t-r<n fed <in Reeve/ed Paper and RegelahI~

PSE&G NUCLEAR LLCNEA08000I - 73258Page 2 of 7

4. Based on the facts set forth in these FINDINGS, the Department has determined that PSE&GNUCLEAR LLC has violated Air Pollution Control Act, N.J.S.A. 26:2C-1 et seq., and theregulations promulgated pursuant thereto specifically, N.J.A.C. 7:27-22.3(e).

5. In order to resolve this matter without trial or adjudication, PSE&G NUCLEAR LLC has agreedto entry of this ACO and to be bound by its terms and conditions.

ORDER

NOW, THEREFORE, IT IS HEREBY ORDERED THAT:

A. COMPLIANCE SCHEDULE

6. PSE&G NUCLEAR LLC shall take whatever actions are necessary to achieve and maintaincompliance with N.J.A.C. 7:27-22.3 including but not limited to the following:

A. By June 15, 2008, submit an operating permit modification application to the NJDEPregarding the correction of emission factors for the Guardhouse Standby Diesel Engine(Subject item U33) and Scania Diesel Fire Pump (Subject item U35)

B. PSE&G NUCLEAR LLC shall completely and accurately reply to all requests forinformation that may be made by the Department during its review of theadministratively complete operating permit modification application within 30 days afterreceipt of the requests. All submittals to the Department shallbe certified in accordancewith N.J.A.C. 7:27-1.39.

C. PSE&G Nuclear shall comply with the annual hours of operation limits set forth in theircurrent Operating Permit, BOP050003-6550. The Guardhouse Standby Diesel Engines(Subject Item U333) shall operate at or below 100 hours per year. The Scania Diesel FirePump (Subject item U35) shall operate at or below 500 hrs per year. The hours ofoperation shall include all maintenance and testing periods but exclude documentedemergency operating hours. The current hourly and annual emission limits for theGuardhouse Standby Diesel Engines Subject Item U33) and the Scania Diesel Fire Pump(Subject item U35) shall be stayed.

7. If PSE&G NUCLEAR LLC is not able to achieve compliance by taking the above actions,PSE&G NUCLEAR LLC is responsible for taking whatever additional actions are necessary inorder to comply with all applicable federal, state and local permits as well as all applicablestatutes, codes, rules, regulations and orders, including but not limited to the statutes andregulations cited herein.

PSE&G NUCLEAR LLCNEA080001 - 73258Page 3 of 7

B. PROGRESS REPORTS

8. PSE&G NUCLEAR LLC shall submit progress reports to the Department on a quarterly basisbeginning second quarter 2008. The report shall be submitted to the Southern Regional Officewithin fifteen days of the end of the period Each report shall explain the status of PSE&GNUCLEAR LLC's compliance with this ACO and shall include, but not be limited to, thefollowing:

A identification of site and reference to this ACO;B. status of permitting and planning approvals and any work at the site and progress to

date;C. difficulties or problems encountered during reporting period and actions taken to

rectify;D. activities planned forthe next reporting period;E. :required and actual completion date for each item required by this ACO;F. an explanation of any non-compliance with the compliance schedule; andG. evaluation of all corrective measures implemented to date.

D. STIPULATED PENALTIES

9. PSE&G NUCLEAR LLC shall pay stipulated penalties to the Department, as set forth below,for failure to comply with the provisions of this ACO unless the Department has notified PSE&GNUCLEAR LLC in writing that a stipulated penalty will not be assessed for violations of thecompliance schedule pursuant to the force majeure provisions of this ACO.

Calendar Days After Due Date1-78-1415 or more

Per Calendar Day$500$1000$2500

10. Within 45 calendar days after PSE&G NUCLEAR LLC's receipt of a written demand from theDepartment for stipulated penalties, PSE&G NUCLEAR LLC shall submit a check to theDepartment as outlined in paragraph 9 above.

11. If PSE&G NUCLEAR LLC fails to pay stipulated penalties pursuant to the preceding paragraphs,the Department may take action to collect same, including, but not limited to, instituting civilproceedings to collect such penalties pursuant to R. 4:67 and R. 4:70 or assess civiladministrative penalties for violations of this ACO.

12. The payment of stipulated penalties does not alter PSE&G NUCLEAR LLC's responsibility tocomplete all requirements of this ACO. 0

PSE&G NUCLEAR LLCNEA080001 - 73258Page 4 of 7

E. FORCE MAJEURE

13. If any event occurs which is beyond the control of PSE&G NUCLEAR LLC and which PSE&GNUCLEAR LLC believes will or may cause delay in the achievement of the compliance scheduleprovisions of this ACO, PSE&G NUCLEAR LLC shall notify' the Department in writing within7 calendar days of becoming aware of the delay or anticipated delay, as appropriate. In thenotification, PSE&G NUCLEAR LLC shall reference this paragraph, describe the anticipatedlength of the delay, the precise cause or causes of the delay, and any measures taken or to betaken to minimize the delay. PSE&G NUCLEAR LLC shall take all necessary action to preventor minimize any such delay.

14. The Department may adjust the deadlines in the compliance schedule of this ACO for a periodno longer than the delay if the Department finds that:A. PSE&G NUCLEAR LLC has complied with the notice requirements of paragraph 13;B. any delay or anticipated delay has been or will be caused by fire, flood, riot, strike, or other

circumstances beyond the control of PSE&G NUCLEAR LLC; andC. PSE&G NUCLEAR LLC has taken all necessary actions to prevent or minimize the delay.

15. If the Department denies PSE&G NUCLEAR LLC's force majeure request, PSE&G NUCLEARLLC may be subject to stipulated penalties. The burden of proving that any delay is caused bycircumstances beyond the control of PSE&G NUCLEAR LLC and the length of any such delayattributable to those circumstances shall rest with PSE&G NUCLEAR LLC. Increases in thecost or expenses incurred by PSE&G NUCLEAR LLC in fulfilling the requirements of this ACOshall not be a basis for an extension of time. Delay in an interim requirement shall notautomatically justify or excuse delay in the attainment of subsequent requirements. Contractor'sbreach shall not automatically constitute foirce majeure.

F. GENERAL PROVISIONS

16. Entry into this ACO shall not constitute an admission of liability by PSE&G NUCLEAR LLCfor any of the violations listed herein.

17. Nothing contained in this ACO restricts the ability of the Department to raise the above Findingsin any other proceeding, specifically including, but not limited to, proceedings pursuant toN.J.S.A. 13: IE-126 et seq., (commonly referred to as A-901).

18. This ACO shall be binding on PSE&G NUCLEAR LLC, its respective agents, successors,assigns, and any trustee in bankruptcy or receiver appointed pursuant to a proceeding in law orequity.

19. This ACO shall be fully enforceable as a final Administrative Order in the New Jersey Superior

PSE&G NUCLEAR LLCNEA080001 - 73258Page 5 of 7

Court.

20. PSE&G NUCLEAR LLC agrees not to contest the terms or conditions of this ACO except thatPSE&G NUCLEAR LLC may contest the Department's interpretation or application of suchterms or conditions in any action brought by the Department to enforce this ACO's provisions.

21. This ACO shall not relieve PSE&G NUCLEAR LLC from obtaining and complying with allapplicable federal, state and local permits as well as all applicable statutes, codes, rule,regulations and orders, including but not limited to the statutes and regulations cited herein.

22. No modification or waiver of this ACO shall be valid except by written amendment dulyexecuted by PSE&G NUCLEAR LLC and the Department or by the Department's writtenmodification pursuant to the force majeure provisions herein.

23. Unless otherwise specifically provided herein, PSE&G NUCLEAR LLC shall submit alldocuments required by this ACO, except penalty payments, to the Department by certified mail,return receipt requested or by hand delivery with an acknowledgment of receipt form for theDepartment's signature to:

Richeile B. Wormley, ManagerAir Compliance & EnforcementSouthern Regional Office2 Riverside Drive, Suite 201Camden, NJ 08103

The date the Department receives the certified mail or executes the acknowledgment will be thedate the Department uses to determine PSE&G NUCLEAR LLC's compliance with this ACO.

24. Unless otherwise specifically provided herein, any communication made by the Department toPSE&G NUCLEAR LLC pursuant to this ACO shall be sent to

Edward J. KeatingEnvironmental ManagerPSE&G NUCLEAR LLCPO Box 236 - MIC N21Hancocks Bridge, NJ 08038

25. PSE&G NUCLEAR LLC shall not :construe any unwritten or informal advice, guidance,suggestions, or comments by the Department, or by persons acting on behalf of the Department,as relieving PSE&G NUCLEAR LLC of its obligations under its permit(s), this ACO. the AirPollution Control regulations, and/or the Air Pollution Control Act.

26. In addition to the Department's statutory and regulatory rights to enter and inspect, PSE&G

PSE&G NUCLEAR LLCNEA080002 - 65500Page 7 of 7

Department that all the requirements of this ACO have been satisfied.

36. This ACO shall become effective upon the execution hereofby all parties, subject to completionof any required public participation process.

DATED:PSE&G N L•L a','.' [ ..BY: •r<> ..NA fi . ... iL' ,' .... ' J Z•71...TITLE: / ,:(L•. "" - - '- ________

By this signature, I certify that I have fullauthority to execute this document on behalfof PSE&G NUCLEAR LLC.

0 /

DATED: :-' " KNJDEPBY:NAME: k>,&k< ti /;" , 'v,TITLE: i v C

By this signature, I certify that I have fullauthority to execute this document on behalfofNJDEP.

0

ATTACHMENT 3

Summary of Stack Tests

PSEG Nuclear LLC Hope Crk-Salem Gen Stations (65500) Date: 10/23/200

New Jersey Department of Environmental Protection

Reason for Application

Permit Being Modified

Permit Class: BOP Number: 80001

Description PSEG Nuclear is submitting this Title V Renewal application to its Title V permit. Pleaseof Modifications: see the submittal package for more information.

Page 1 of 1

Date: 101'23/200, PSEG Nuclear LLC Hope Crk.-Salem Gen Stations (65500)

New Jersey Department of Environmental ProtectionFacility Profile (General)

Facility Name (AIMS): PSEG Nuclear LLC Hope Crk-Salem Gen Sta Facilit, ID (AIMS): 65500

Street SALEM GENERATING STAAddress: ALLOWAY CREEK NCK RD

LOWER ALLOWAYS CREEK TOWNSHIP, NJ08038

Mailing PO BOX 236 MC/N21Address: HANCOCKS BRIDGE, NJ 08038

Count-: Salem

LocationDescription:

r State Plane Coordinates:

X-Coordinate:

Y-Coordinate:

Units:

Datum:

Source Org.:

Source Type:

I Industry:

Primary SIC: 4911

Secondary SIC:

NAICS:

Page 1 of 3

Date: 10/23/200:PSEG Nuclear LLC Hope Crk-Salem Gen Stations (65500)

New Jersey Department of Environmental Protection

Facility Profile (General)

Contact Type: BOP - Operating Permits

Organization: PSEG Nuclear LLC

Name: Luis Cataldo

Title: Enviromnental Supervisor- Salem Chemistry

Phone: (856) 339-2307 x

Fax: ( ) x

Other: ( ) x

Type:

Email: [email protected]

Contact Type: General Contact

Organization: PSEG Nuclear LLC

Name: Luis Cataldo

Title: Enviromnental Supervisor-Salem Chemistry

Phone: (856) 339-2307 x

Fax: ( ) x

Other: ( ) x

Type:

Email: [email protected]

Contact Type: On-Site Manager

Organization: PSEG Nuclear LLC

Name: Thomas P. Joyce

Title: Senior VP - Operations

Phone: (856) 339-1100 x

Fax: (856) 339-1580 x

Other: ( ) x

Type:

Email [email protected]

Org. Type: Corporation

NJ EIN: 00585211041

Mailing PO Box 236 MC/S07Address: Hancocks Bridge, NJ 08038

Org. Type: Corporation

NJ EIN: 00585211041

Mailing PO Box 236 MC/S07Address: Hancocks Bridge, NJ 08038

Org. Type: Corporation

NJ EIN: 00585211041

Mailing PO Box 236 M/C N28Address: Hancocks Bridge, NJ 08038

Page 2 of 3

PSEG Nuclear LLC Hope Crk-Salem Gen Stations (65500)

New Jersey Department of Environmental Protection

Facility Profile (General)

Date: 10/23/200:

Contact Type: Operator

Organization: PSEG Nuclear LLC

Name: PSEG Nuclear LLC

Title:

Phone: (856) 339-1100 x

Fax: (856) 339-1448 x

Other: ( ) - x

Type:

Email:

Contact Type: Owner (Current Primary)

Organization: PSEG Nuclear LLC

Name: PSEG Nuclear LLC

Title:

Phone: (856) 339-1100 x

Fax: (856) 339-1448 x

Other: ( ) - x

Type:

Email:

Contact Type: Responsible Official

Organization: PSEG Nuclear LLC

Name: Thomas P. Joyce

Title: Senior VP - Operations

Phone: (856) 339-1100 x

Fax: (856) 339-1580 x

Other:( ) - x

Type:

Email: [email protected]

Org. Type: Corporation

NJ EIN: 00585211041

Mailing PO Box 236 M/C N09Address: Hancocks Bridge, NJ 08038

Org. Type: Corporation

NJ EIN: 00585211041

Mailing PO Box 236 M/C N09Address: Hancocks Bridge, NJ 08038

Org. Type: Corporation

NJ ELN: 00585211041

Mailing PO Box 236 M/C N28Address: Hancocks Bridge, NJ 08038

Page 3 of 3

PSEG Nuclear LLC Hope Crk-Salem Gen Stations (65500) Date: 10/23/2008

New Jersey Department of Environmental ProtectionFacility Profile (Permitting)

1. Is this facility classified as a small business by the USEPA? No

2. Is this facility subject to N.J.A.C. 7:27-22? Yes

3. Are you voluntarily subjecting this facility to the requirements of Subchapter 22? No

4. Has a copy of this application been sent to the USEPA? No

5. If not, has the EPA waived the requirement? No

6. Are you claiming any portion of this application to be confidential? No

7. Is the facility an existing major facility? Yes

8. Have you submitted a netting analysis? No

9. Are emissions of any pollutant above the SOTA threshold? No

10. Have you submitted a SOTA analysis? No

11. If you answered "Yes" to Question 9 and "No" to Question10, explain whya SOTA analysis was not required

12. Have you provided, or are you planning to provide air contaminant modeling? No

0.

Page 1 of I

RWD JUL2 3 2009,

DEPARTMENT OF ENVIRONMENTAL PROTECTIONJon S. Corzine Mark N. Mauriello

Governor CommissionerOffice of Dredging and Sediment Technology

P.O. Box 028Trenton, NJ 08625

(609) 292-1250FAX (609) 777-1914 N ON -SEG

Mr. Gary Bickle C/O AKRF100 Center Blvd. Suite 102 HI/JMarlton, NJ 08053

Re: Waterfront Development Permit/Water Quality Certificate/Acceptable Use DeterminationFile No: 1704-02-0001.6 WFD 080001Applicant: PSEG Nuclear LLCProject: Salem and Hope Creek Maintenance DredgingLower Alloways Creek Township, Salem County

Dear Mr. Bickle:

Enclosed, please find an approved construction permit. Please read the permit and its terms and Conditionscarefully. If you consider yourself aggrieved by our decision regarding your application, you may request a hearingby completing the requirements of the attached administrative hearing request checklist and tracking form. Unlessyou request a hearing to contest this permit or its conditions, you have accepted its terms and conditions.

You are required to keep a copy of your permit and the approved drawings at the construction site for theduration of the project. Failure to do so is a violation of the permit.

If you are required to record a Grant of Conservation Restriction/Easement, you must present theDepartment with proof that you have recorded it within ninety (90) days of issuance of this permit. You may NOTCOMMENCE CONSTRUCTION until you have properly recorded the Division of Land Use Regulation approvedGrant of Conservation Restriction/Easement documents and fulfilled the pre-construction conditions of this permit.

If a tidelands grant, lease or license is required as a condition of this permit, you may not begin constructionuntil the Bureau of Tidelands Management has delivered the necessary conveyances. Construction prior to thereceipt of the necessary conveyances is in violation of State law and will subject you to fines up to $1,000.00 plus$100.00 per day. Furthermore, the cost for the tidelands instrument may be higher since the property claimed will beappraised as improved property. You may be required to remove any unauthorized structures placed in tidelandsclaimed areas.

Please do not hesitate to contact the Office's project manager, listed on the first page of the permit, todiscuss any concerns or questions you may have. Thank you for working with the staff of the Office to protect ourstate's natural resources. r'

w/attachments

ADJUDICATORY HEARING REQUEST CHECKLIST AND TRACKING FORM

I. Permit Being Appealed:

Facility Name

Issuance Date of Final Permit Decision Permit Number

II. Person Requesting Hearing:

Name/Organization Name of Attorney (if applicable)

Address Address of Attorney

TelephoneNumber Telephone Number of Attorney

III1 Please include the following information as part of your request:

A. The date the permittee received the permit;B. A copy of the Denial of Permit and a list of all issues being appealed;C. The legal and factual questions at issue;D. A statement as to whether you raised each legal and factual issue during the public comment

period;

E. An estimate of the amount of time required for the hearing;G. A request, if necessary, for a barrier-free hearing location for disabled persons;H. A clear indication of any willingness to negotiate a settlement with the Department prior to the

Department's processing of your hearing request to the Office of Administrative Law; andI. This form, completed, signed and dated with all of the information listed above, including

attachments, to:

I. Office of Legal AffairsATTENTION: Adjudicatory Hearing RequestsDepartment- of Environmental Protection401 East State StreetPO Box 402, Trenton, New Jersey 08625-0402

2. Suzanne Dietrick, ChiefOffice of Dredging and Sediment Technology401 East State StreetPO Box 028, Trenton, New Jersey 08625-0029

3. Any otherý person named on the permit (if you are a permittee under that permit).4. The permittee(s) (if you are a person seeking consideration as a party to the action).

IV. Signature: Date:

.4

PROJECT COMPLETION REPORT

This Project Completion Report must be mailed or faxed to the proper address below. Pleasecircle the appropriate permit type(s).

Please mail notice of completion of projects authorized under a Freshwater WetlandsIndividual, General Permit or Transition Area Waiver, Major or Minor StreamEncroachment Permit, or Highlands Approval to:

State of New JerseyDepartment of Environmental ProtectionCoastal & Land Use Compliance & EnforcementP.O. Box 422Trenton, NJ 08625-0422Attention: Manager, Coastal & Land Use Compliance & EnforcementFax to: (609) 633-6798

Please mail notice of completion of projects authorized under an Individual CAFRA orWaterfront Development Permit or Coastal General Permit to:

State of New JerseyDepartment of Environmental ProtectionCoastal & Land Use Compliance & Enforcement1510 Hooper AvenueToms River, NJ 08753Attention: Manager, Coastal & Land Use Compliance & EnforcementFax to: (732) 255-0877

Permit InformationProject Manager:Permit Number(s):

Date of Completion:

The undersigned hereby certifies that all activities approved by the Department within the abovereferenced permit/s have been constructed and completed in accordance with the plans approvedtherein, that said project is in compliance with all terms and conditions of the permit, and thatany unauthorized encroachments have been removed.

Engineer's Signature and Seal:New Jersey License Number:Date:

CONSTRUCTION REPORT

This Project Commencement Report must be mailed or faxed to the proper address below. Pleasecircle the appropriate permit type(s).

Please mail notice of commencement of projects authorized under a Freshwater WetlandsIndividual, General Permit or Transition Area Waiver, Major or Minor StreamEncroachment Permit, or Highlands Approval to:

State of New JerseyDepartment of Environmental ProtectionCoastal & Land Use Compliance & EnforcementP.O. Box 422Trenton, NJ 08625-0422Attention: Manager, Coastal & Land Use Compliance & EnforcementFax to: (609) 633-6798

Please mail notice of commencement of projects authorized under an Individual CAFRA or.Waterfront Development Permit or Coastal General Permit to:

State of New JerseyDepartment of Environmental ProtectionCoastal & Land Use Compliance & Enforcement1510 Hooper AvenueToms River, NJ 08753Attention: Manager, Coastal & Land Use Compliance & EnforcementFax to: (732) 255-0877

Permit InformationProject Manager:Permit Number(s):

Date of Commencement:

I hereby give notice that construction will begin on the above noted project on the date statedabove (must give at least 7 days notice). Also. as required by the permit, a copy of the abovereferenced permit(s) along with all approved drawings shall be available for inspection at theproject site throughout construction.

Engineer's Signature and Seal:New Jersey License Number:Date:

STATE OF NEW JERSEYDEPARTMENT OF ENVIRONMENTAL PROTECTION

SITE REMEDIATION PROGRAMOFFICE OF DREDGING AND SEDIMENT TECHNOLOGY

401 East State Street, P.O. Box 028Trenton, NJ 08625

PERM[T

liiacnnlnc ~i d~lwsandiugulations of the Stae~ of New Ja-,' the Departt-nen- of En-'irormimtal Protetion had~yein~hspm optfcun thein ac bYbo Tipmi-sjobewihde cause and is sneto th de

Thntafions, tmiiq and conditions liei below and on~tbe attache,2 pages Fo h u-oeo hs oumý"emt-en.iý4ft 4l. bewficbhon Y"- snfrion, autllorr aioný umver, tc," Viitlabon of' any, tem, condiVo r- imitation of tlis permit isa

*WIatioiroffand may ubijti pejmitioetuenfmiumt action. -

A1prva Dte J~yU-200

-Expiration Date':Juy 1 ;L2014Iý'

Permit Number/s1704-02-0001.6

WFD 080001

Type of Approval/sWaterfront Development - IP In Water; Water QualityCertificate; Acceptable Use Determination

Enabling Statute/sNJSA 12:5-3NJSA 58: 1OA

Applicant

PSEG Nuclear LLC,P.O. Box 236Hancocks Bridge, NJ08036

r Creek Road Neck RoadTownship, Salem Co.

Description

I Perform five ir

various project

Salem Barge Slip Hope Creek Barge Slip &

Discharge Area (- or hydraulic means and

the subject dredged

This permit is authorizNdlspecifically, the Rules oflnjWildlife or Vegetation SpIOn Land NJ.A.C. 7:7E-7-

ent, N.J.A.C. 7:7E-1.1 et seq.,.5; Endangered or Threatenedig 7:7E-4.6; Dredge Disposal

By issuance of this permit, the S

property or adjacent properties. qpursuant to N.J.A.C. 7:7E-1.5(b)4.

claim to any portion of the subjectthe right to inspect the construction

IS NOT EFFECTIVE AND NO)THER REGULATED ACTIVIr

APPROVED BY THISERTAKEN UNTIL THE

APPLICANT HAS SATISFIED ALL PRE-CONSTRUCTION CONDITIONS AS SETFORTH IN THIS PERMIT PURSUANT TO N.J.A.C. 7:7E-1.5(b)4.

This permit is not valid unless au-thorizing signatureappears on, t a•east page-

File No. 1704-02-0001.6 WFTD08000 IPage 2 of 4 pages

STANDARD CONDITIONS:

1 . Extent of approval:

a. This document grants permission to perform certain activities that are regulated by the State of New Jersey. Theapproved work is described by the text of this permit and is further detailed by the approved drawings listed herein.All work must conform to the requirements, conditions and limitations of this permit and all approved drawings.

b. If you alter the project without prior approval, or expand work beyond the description of this permit, you may be inviolation of State law and may be subject to fines and penalties. Approved work may be altered only with the priorwritten approval of the Department.

c. You must keep a copy of this'permit and all approved drawings readily available for inspection at the work site.

2. Acceptance of permit: If you begin any activity approved by this permit, you thereby accept this document in itsentirety, and the responsibility to comply with the terms and conditions. If you do not accept or agree with this documentin its entirety, do not begin construction. You are entitled to request an appeal within a limited time as detailed on theattached Administrative Hearing Request Checklist and Tracking Form.

3. Recording with County Clerk: You must record this permit in the Office of the County Clerk for each countyinvolved in this project. You must also mail or fax a copy of the front page of this permit to the Department showing thereceived stamp from each County Clerk within 30 days of the issuance date

4. Notice of Construction: You must notify the Department in writing at least 7 days before you begin any workapproved by this permnit by submitting the attached construction report. The Construction Reports are also available atwww.nj .gov/dep/landuse.

5. Expiration date: All activities authorized by this permit must be completed by the expiration date shown on the firstpage unless otherwise extended by the Division. At that time, this permit will automatically become invalid and none ofthe approved work may begin or continue until a replacement permit is granted. (Some permits may qualif for anextension of the expiration date. Please contact the Department for further information.)

6. Rights of the State:

a.. This permit is revocable and subject to modification by the State with due cause.

b. Representatives from the State have the statutory authority to enter and inspect this site to confirm compliance withthis perm.it and may suspend construction or initiate enforcement action if Work does not comply with this permit.

c. This permit does not grant propert .y rights. The issuance of this permit shall not affect any action by the State onfuture applications, nor affect the title or ownership of property, nor make the State a party in any suit or question ofownership.

7. Other responsibilities: You must obtain all necessary local, Federal and other State approvals before you beginwork. All work must be stabilized in accordance with the Standards for Soil Erosion and Sediment Control in NewJersey, and all fill material must be free of toxic pollutants in toxic amounts as defined in section 307 of the Federal Act.

File No. 1704-02-0001.6 WFDO80001Page 3 of 4 pages

SPECIAL CONDITIONS IN ADDITION TO THE STANDARD CONDITIONS:

8. The permittee shall immediately inform the Department of any unanticipated adverse effects on the environment notdescribed in the application or in the conditions of this permit.

9. Any regulated activities undertaken on the site before a copy of this recorded restriction is submitted to theDepartment will be considered in violation of the implementing rules and this permit.

11. All necessary local, Federal, and other State approvals must be obtained by the applicant prior to the commencementof the herein-permitted activities. Approvals from the following may be required: The New Jersey Geodetic Surveyand Bureau of Tidelands Management New Jersey Department of Environmental Protection for the proposed mixed-use development.

12. The permittee is responsible to maintain all existing off-site Public. Trust Rights /Public Access to the Waterfrontareas and amenities as required by previous permits issued to PSE&G.

The drawings hereby approved are: are shown on sheets I of 3 of the plans entitled "SITE PLAN (As of Feb 9, 2005)SALEM AND HOPE CREEK GENERATING STATIONS BLOCK 26, LOTS 4, 4.01, 5 & 5.01 TOWNSHIP OF LOWERALLOWAYS CREEK, SALEM COUNTY, NJ, DATED Jan 25, 1996 and last revised 2/9/05 and prepared by PSEG ; and onthe plan entitled "PUBLIC SERVICE ELECTRIC AND GAS COMPANY Salem & Hope Creek Generating Station; Twp.Lower Alloways Creek Salem County, New Jersey, Dated 6/9/2008 and prepared by S.T. Hudson Engineers, INC.

13. OTHER CONDITIONS RELATED TO ACTIVITY

A. Prior to any access, staging or work proposed on privately held lands or tidelands, the permittee must obtain writtenaccess agreements.

O B. In the event that hydraulic dredging is to be utilized and the CDF will require preparation, the permittee shall at aminimum of 90-days prior to commencement of work, provide written notice to the issuing office including adescription of said work and receive authorization from the Department prior to performing said work.

C. The permittee is responsible to assure that all dredge pipeline crossings are clearly marked, visible by day and night andmaintained so that no hindrance to navigation results.

D. Upon termination of dredging activities, the permittee shall remove all pipelines from waterways and wetlands.

E. The permittee is responsible for the dredged material disposal operation and the CDF. Therefore, to assure the CDF'sintegrity, the permittee shall oversee the engineering, construction and management, prior to and during the deposition ofdredged material. All efforts shall be taken to minimize sedimentation or turbidity from entering surrounding waters,wetlands and buffers. This shall include, but is not limited to, reducing the rates of production, berming and other typesof stabilization as necessary.

F. The minimum retention time of the dredged material in the CDF shall be no less than 24 hours to allow for sufficientsettling prior to discharge of the decant water to surface waters of the State.

G. In order to protect fishery resources, the permitte must comply with the Delaware River Basin Fish and WildlifeManagement Cooperative Recommended Dredging Restrictions for Fishery Resources in the Delaware River and Bay, asmost recently amended. Accordingly, Horseshoe and Blue Claw Crab and Dredging Timing Restrictions apply whichlimit dredging work from September 15 through November 30 of any given year.

ACCEPTABLE USE DETERMINATION

* This office has reviewed the materials and data submitted with your request. The placement of the subject-dredged material atthe identified CDF is acceptable. This letter shall serve as the Department's Acceptable Use Determination for theplacement of material originating from. the PSE&G facility as authorized by this permit to be deposited at the on siteCDF above the MHWL as depicted in the authorized plans.

File No. 1704-02-0001.6 WFDO80001Page 4 of 4 pages

This determination shall only apply to the presently characterized sediments authorized to be dredged by way of this permit.Any dredging beyond the depth or scope authorized by this permit,. or the removal of additional sediment subsequently, shallrequire a separate Acceptable Use Determination commensurate with the physical and chemical characteristics of theadditional material. This AUD does not authorize the transfer of any dredged materials out of New Jersey until a writtenAcceptable Use Determination or letter of authorization, for the subject material, is received and reviewed by this office.

If the permittee elects to dispose/use the dredged material from this project at an alternate location, written authorization mustbe obtained from the Office of Dredging and Sediment Technology prior to the tra.nsport of any dredged material to saidalternate disposal location. Any alternate disposal/use location must obtain all required state, local and federal permits beforethe Office would grant a modification of this permit to transport dredged materia ýto the alternate location.

/ bATE uzanne.U..Diet e

DEPARTMENT OF THE ARMY

PHILADELPHIA DISTRICT CORPS OF ENGINEERS NN P EWANAMAKER BUILDING, 100 PENN SQUARE EAS' N O N P S E G ,

PHILADELPHIA. PENNSYLVANIA 19107-3390

OF JUL 14 2008Regulatory BranchApplication Section I

SUBJECT: CENAP-OP-R-2006-6232-45 (NWP 3)

Project Name: PUBLIC SERVICE ELECTRIC AND GAS NUCLEAR LLC(SALEM AND HOPE STATIONS)

Mr. Christopher E. WhitePSEG Nuclear LLCP.O. Box 236Hancock Bridge, New Jersey 08038-0236

Dear Mr. White:

This is in regard to your proposal, to continue hydraulic maintenance dredging and desiltingoperations for the Salem circulating and service water intake structures, and discharge pipes, andfor the Hope Creek service water intake structure, and discharge pipe, located at the Salem andHope Creek Nuclear Generating Stations, on Artificial Island, Block 26, Lots 4, 4.01 and 5.01, inLower Alloway Township, Salem County, New Jersey.

Under current Federal regulations, a Department of the Army permit is required for work orstructures in navigable waters of the United States and/or the discharge of dredged or fillmaterial into waters of the United States including adjacent and isolated wetlands. Based uponour review of the information you have provided, it has been determined that the proposed workis approved by the existing Department of the Army Nationwide Permit (NWP) described below,provided the work is conducted in compliance with the special conditions below and the generalconditions specified in Enclosure 1.

Nationwide Permit 3: MaintenanceActivities related to:

(a) The repair, rehabilitation, or replacement of any previously authorized, currentlyserviceable, structure, or fill, or of any currently serviceable structure or fill authorized by 33CFR 330.3, provided that the structure or fill is not to be put to uses differing from those usesspecified or contemplated for it in the original permit or the most recently authorizedmodification. Minor deviations in the structure's configuration or filled area, including those dueto changes in materials, construction techniques,, or current construction codes or safetystandards that are necessary to make the repair, rehabilitation, or replacement are authorized.This NWP authorizes the repair, rehabilitation, or replacement of those structures or fillsdestroyed or damaged by storms, floods, fire or other discrete events, provided the repair,rehabilitation, or replacement is commenced, or is under contract to commence, within two yearsof the date f their destruction or damage. In cases of catastrophic events, such as hurricanes or

-2-

tornadoes, this two-year limit may be waived by the district engineer, provided the permittee candemonstrate funding, contract, or other similar delays.

(b) This NWP also authorizes the removal of accumulated sediments and debris in thevicinity of and within existing structures (e.g., bridges, culverted road crossings, water intakestructures, etc.) and the placement of new or additional riprap to protect the structure. Theremoval of sediment is limited to the minimuln necessary to restore the waterway in theimmediate vicinity of the structure to the approximate dimensions that existed when the structurewas built, but cannot extend further than 200 feet in any direction from the structure. This 200foot limit does not apply to maintenance dredging to remove accumulated sediments blocking orrestricting outfall and intake structures or to maintenance dredging to remove accumulatedsediments firom canals associated with outfall and intake structures. All dredged or excavatedmaterials must be deposited and retained in an upland area unless otherwise specificallyapproved by the district engineer under separate authorization. The placement of riprap must bethe minimum necessary to protect the structure or to ensure the safety of the structure. Any bankstabilization measures not directly associated with the structure will require a separateauthorization from the district engineer.

(c) This NWP also authorizes temporary structures, fills, and work necessary to conductthe maintenance activity. Appropriate measures must be taken to maintain normal downstreamflows and minimize flooding to the maximumn extent practicable, when temporary structures,work, and discharges, including cofferdams, are necessary for construction activities, access fills,or dewatering of construction sites. Temporary fills must consist of materials, and be placed in amanner, that will not be eroded by expected high flows. Temporary fills must be removed intheir entirety and the affected areas returned to pre-construction elevations. The areas affected bytemporary fills must be revegetated, as appropriate.

(d) This NWP does not authorize maintenance dredging for the primary purpose ofnavigation or beach restoration. This NWP does not authorize new stream channelization orstream relocation projects.

Notification: For activities authorized by paragraph (b) of this NWP, the permittee mustsubmit a pre-construction notification to the district engineer prior to commencing the activity(see general condition 27). Where maintenance dredging is proposed, the pre-constructionnotification must include information regarding the original design capacities and configurationsof the outfalls, intakes, small impoundments, and canals. (Sections 10 and 404)

Note: This NWP authorizes the repair, rehabilitation, or replacement of any previouslyauthorized structure or fill that does not qualify for the Clean Water Act Section 404(f)exemption for maintenance.

You are advised that this verification of NWP authorization is valid for two (2) years fromthe date of this letter, unless the NWP authorization is modified, suspended, or revoked. In theevent that the NWP authorization is reissued and/or modified during that time period, this two-year expiration date will remain valid, provided the activity complies with any subsequentreissuance and/or modification of the NWP authorization.

The enclosed table (Enclosure 2) identifies those NWPs which require a preconstructionnotification (PCN) to the Corps of Engineers, those which have been regionally conditioned bythe Division Engineer, and those which have been denied 401 Water Quality Certification(WQC) and/or Coastal Zone Management (CZM) consistency by the State. It is noted that CZM

. . .I

-3-

consistency from the State is only required for those activities in or affecting a State's coastalzone. Additionally, some of the NWPs do not involve a discharge of dredged or fill material.and as such, do not require a 401 WQC. For those NWPs not requiring a 401 WQC, theappropriate rows and columns have been identified with the term "NA". If the State has deniedthe required WQC and/or not concurred with the Corps' CZM consistency determination, theNWP authorization is considered denied without prejudice until an individual project specificWQC and/or CZM approval is obtained. This approval must be obtained in order for the activityto be authorized under the NWP and a copy provided to this office before work begins. Anyproject specific conditions required by the State for the WQC and/or CZM approval willautomatically become part of the NWP authorization.

PROJECT SPECIFIC SPECIAL CONDITIONS:

1. All work performed in association with the above noted project shall be conducted inaccordance with the project plans identified as "Maintenance Dredging...", dated February 1,2008, unrevised sheets, and revised April 24, and May 22, 2008, sheets 1, 4, 5, 6,7, 8, 9, 10, 11.16, 17, 18, 19, and 20 of 20. The Plans were prepared by S.T. Hudson Engineers, Incorporated.

2. Construction activities shall not result in the disturbance or alteration greater than 449,230square feet (10.3 acres) of tidal waters of the United States.

3. Any deviation in construction methodology or project design fiom that shown on the abovenoted drawings or repair plan must be approved by this office, in writing, prior to performance ofthe work. All modifications to the above noted project plans shall be approved, in writing, bythis office. No work shall be performed prior to written approval of this office.

4. This office shall be notified prior to the commencement of authorized work by completingand signing the enclosed Notification/ Certification of Work Commencement Form(Enclosure3). This office shall also be notified within 10 days of the completion of theauthorized work by completing and signing the enclosed Notification/Certification of WorkCompletion/Compliance Form (Enclosure 4). All notifications required by this condition shallbe in writing. The Notification of Commencement of work may be sent to this office byfacsimile or other electronic means; all other notification shall be transmitted to this office byregistered mail. Oral notifications are not acceptable. Similar notification is required each timemaintenance work is to be done under the terms of this Corps of Engineers permit.

5. The permittee understands and agrees that, if future operations by the United States requirethe removal, relocation, or other alteration, of the structure or work herein authorized, or if, inthe opinion of the Secretary of the Army or his authorized representative, said structure or workshall cause unreasonable obstruction to the free navigation of the navigable waters, the permitteewill be required, upon due notice from the Corps of Engineers, to remove, relocate, or alter thestructural work or obstructions caused thereby, without expense to the United States. No claimshall be made against the United States on account of any such removal or alteration.

6. That the pennittee is responsible for ensuring that the contractor and/or workers executingthe activity(s) authorized by this permit have knowledge of the terms and conditions of the

-4-

authorization and that a copy of the permit document is at the project site throughout the periodthe work is underway.

7. That all dredged and/or silt material shall continue to be permanently disposed in the confinedon-site, upland disposal area on Artificial Island, located on Block 26, Lot 4, directly adjacent tothe Salem and Hope Creek Nuclear Power Plant.

8. That the permittee shall maintain adequate surveillance of the dredging/desilting disposaloperations to assure that the banks used to confine the dredged/silt material are safe from failureand that the disposal area is not used beyond capacity.

9. That the dredged/silt material disposed on upland property shall be appropriately contained toprevent erosion and subsequent sedimentation of the aquatic habitat of any water of the UnitedStates adjacent to or in proximity to that disposal site.

10. That the Corps shall be notified before any subsequent maintenance dredging and/ordesilting takes place, and shall be advised of the amounts of dredged/silt material to be.generated. This permit does not authorize hydraulic hopper dredging.

11. That hydraulic maintenance dredging and desilting operations are authorized for two yearsfrom the date of this verification provided that the dredging locations, depths (-16.4 MLW, -36.4MLW), and the approved disposal area location remain unchanged.

12. The hydraulic dredge/desilting pipeline shall not be located within the Federal navigation

channel.

13. The project verified by this office shall not impact wetlands.

14. The permittee shall comply with all terms and conditions of the district wide BiologicalOpinion issued in 1998, if during dredging, desilting, and disposal operations ShortnoseSturgeon are encountered.

Also enclosed is a pre-addressed postal card (Enclosure 5) soliciting your comments on theprocessing of your application. Any comments, positive or otherwise, on the procedures,timeliness, fairness, etc., may be made on this card. If you should have any questions regardingthis matter, please contact Bryan Bellacima at (215) 656-6732 or write to the above address.

]Sincerely,

rn J, Cia nraniChief, Regulatory Branch

Enclosures

* S-,,Ar' my- Copof Ehngineers

Phiadlpha isrict-,'

/ -NOTICE

This Department of the Army perm~it con~tains .impor-tantpermiftotrms and.. condition's. Pleas eAd te permit and al'term-s and conditions careffully.

Work authorized by this permit may be inspected for,compl anceat a.ny time.

It s ourr rponsibity as, permittee,. to ensure tat all1work authorized by the permit, including all york performed by

onratos~e peformed i strict copliance with all term-hs.

and conditi ons of the permit. Failure: to do so may'result in, adeterm'ination by te Distric, ngineer tosusp~edm ifo

revoke your permit (33CFR 325.7).. It may alosubj ect you to-the enforcement' poedures containe at 33 CF1R3264.4and

,ding civil and criminal action e ble

:31*,,inc,. . , c 4n je..osV

imposition of civi penalties and criminal fines UP to S50,900,O0per day per violation.

If you have any questions about, or need to modify, any ofthe terms and conditions ofuthis permit, youare requested tocontact the Philadelphia District Office at (215) 656-6728.

0ncniin ftepri.Fiuet os a euti

Nationwide Permit General Conditions

1. Navigation. (a) No activity may cause more than a minimal adverse effect on navigation.(b) Any safety lights and signals prescribed by the U.S. Coast Guard, through regulations or otherwise, mustbe installed and maintained at the permittee's expense on authorized facilities in navigable waters ofUnited States. 0.(c) The permittee understands and agrees that, if future operations by the United States require the removal,relocation, or other alteration, of the structure or work herein authorized, or if, in the opinion of the Secretaryof the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to thefree navigation of the navigable waters, the permittee will be required, upon due notice from the Corps ofEngineers, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense tothe United States. No claim shall be made against the United States on account of any such removal oralteration.

2. Aquatic Life Movements. No activity may substantially disrupt the movements of those species of aquaticlife indigenous to the waterbody, including those species that normally migrate through the area, unless theactivity's primary purpose is to impound water. Culverts placed in streams must be installed to maintain lowflow conditions.

3. Spawning Areas. Activities in spawning areas during spawning seasons must be avoided to the maximumextent practicable. Activities that result in the physical destruction (e.g., through fill, or downstream bysubstantial turbidity) of an important spawning area are not authorized.

4. Waterfowl Breeding Areas. Activities in breeding areas for migratory waterfowl must be avoided to themaximum extent practicable.

5. Shellfish Beds. No activity may occur in areas of concentrated shellfish populations, unless the activityAdirectly related to a shellfish harvesting activity authorized by NWP 4 and 48. W

6. Suitable Material. No activity may use unsuitable material (e.g., trash, debris, car bodies, asphalt, etc.).Material used for construction or discharged must be free from toxic pollutants in toxic amounts (see Section307 of the Clean Water Act).

7. Water Supply Intakes. No activity may occur in the proximity of a public water supply intake, exceptwhere the activity is for the repair of public water supply intake structures or adjacent bank stabilization.

8. Adverse Effects From Impoundments. If the activity creates an impoundment of water, adverse effects tothe aquatic system due to accelerating the passage of water, and/or restricting its flow must be minimized tothe maximum extent practicable.

9. Management of Water Flows. To the maximurm extent practicable, the pre-construction course,condition, capacity, and location of open waters must be maintained for each activity, including streamchannelization and storm water management activities, except as provided below. The activity must beconstructed to withstand expected high flows. The activity must not restrict or impede the passage of normalor high flows, unless the primary purpose of the activity is to impound water, or manage high flows. Theactivity may alter the pre-construction course, condition, capacity, and location of open waters if it benefits theaquatic environment (e.g., stream restoration or relocation activities).

10. Fills Within 100-Year Floodplains. The activity must comply with applicable FEMA-approved state o0local floodplain management requirements.

11. Equipment. Heavy equipment working in wetlands or mudflats must be placed on mats, or othermeasures must be taken to minimize soil disturbance.

12. Soil Erosion and Sediment Controls. Appropriate soil erosion and sediment controls must be used and* maintained in effective operating condition during construction, and all exposed soil and other fills, as well as

any work below the ordinary high water mark or high tide line, must be permanently stabilized at the earliestpracticable date. Permittees are encouraged to perform work within waters of the United States during periodsof low-flow or no-flow.

13. Removal of Temporary Fills. Temporary fins must be removed in their entirety and the affected areasreturned to pre-construction elevations. The affected areas must be revegetated, as appropriate

14. Proper Maintenance. Any authorized structure or fill shall be properly maintained, includingmaintenance to ensure public safety.

15. Wild and Scenic Rivers. No activity may occur in a component of the, National Wild and Scenic RiverSystem, or in a river officially designated by Congress as a "study river" for possible inclusion in the systemwhile the river is in an official study status, unless the appropriate Federal agency with direct managementresponsibility for such river, has determined in writing that the proposed activity will not adversely affect theWild and Scenic River designation or study status. Information on Wild and Scenic Rivers may be obtainedfrom the appropriate Federal land management agency in the area (e.g., National Park Service, U.S. ForestService, Bureau of Land Management, U.S. Fish and Wildlife Service).

16. Tribal Rights. No activity or its operation may impair reserved tribal rights, including, but not limited to,reserved water rights and treaty fishing and hunting rights.

*17. Endangered Species. (a) No activity is authorized under any NWTP which is likely to jeopardize thecontinued existence of a threatened or endangered species or a species proposed for such designation, asidentified under the Federal Endangered Species Act (ESA), or which will destroy or adversely modify thecritical habitat of such species.

(b) Federal agencies should follow their own procedures for complying with the requirements of the ESA.Federal permittees must provide the district engineer with the appropriate documentation to demonstratecompliance with those requirements.(c) Non-federal permittees shall notify the district engineer if any listed species or designated critical habitatmight be affected or is in the vicinity of the project, or if the project is located in the designated critical habitatand shall not begin work on the activity until notified by the district engineer that the requirements of the ESAhave been satisfied and that the activity is authorized. For activities that might affect Federally-listedendangered or threatened species or designated critical habitat, the pre-construction notification must includethe name(s) of the endangered or threatened species that may be affected by the proposed work or that utilizethe designated critical habitat that may be affected by the proposed Work. The district engineer will determinewhether the proposed activity "may affect" or will have "no effect" to listed species and designated criticalhabitat and will notify the non-Federal applicant of the Corps' determination within 45 days of receipt of acomplete pre-construction notification. In cases where the non-Federal applicant has identified listed speciesor critical habitat that might be affected or is in the vicinity of the project, and has so notified the Corps, theapplicant shall not begin work until the Corps has provided notification the proposed activity will have "noeffect" on listed species or critical habitat, or until Section 7 consultation has been completed.(d) As a result of formal or informal consultation with the FWS or NMFS the district engineer may addspecies-specific regional endangered species conditions to the NWPs.

0e) Authorization of an activity by a NWP does not authorize the "take" of a threatened or endangered speciess defined under the ESA. In the absence of separate authorization (e.g., an ESA Section 10 Permit, a

Biological Opinion with "incidental take" provisions, etc.) from the U.S. FWS or the NMFS, both lethal and2

non-lethal "takes" of protected species are in violation of the ESA. Information on the location of threatenedand endangered species and their critical habitat can be obtained directly from the offices of the U.S. FWS andNMFS or their world wide web pages at http://www.fws.gov/ and http://www.noaa.gov/fisheries.htmlrespectively.

18. Historic Properties. (a) In cases where the district engineer determines that the activity which may afhistoric properties listed, or eligible for listing, in the National Register of Historic Places, the activity is notauthorized authorized, until the requirements of Section 106 of the National Historic Preservation Act (NHPA)have been satisfied.(b) Federal permittees should follow their own procedures for complying with the requirements of Section 106of the National Historic Preservation Act. Federal permittees must provide the district engineer with theappropriate documentation to demonstrate compliance with those requirements.(c) Non-federal permittees must submit a pre-construction notification to the district engineer if the

authorized activity may have the potential to cause effects to any historic properties listed, determined to beeligible for listing on, or potentially eligible for listing on the National Register of Historic Places, includingpreviously unidentified properties. For such activities, the pre-construction notification must state whichhistoric properties may be affected by the proposed work or include a vicinity map indicating the location ofthe historic properties or the potential for the presence of historic properties. Assistance regarding informationon the location of or potential for the presence of historic resources can be sought from the State HistoricPreservation Officer or Tribal Historic Preservation Officer, as appropriate, and the National Register ofHistoric Places (see 33 CFR 330.4(g)). The district engineer shall make a reasonable and good faith effort tocarry out appropriate identification efforts, which may include background research, consultation, oral historyinterviews, sample field investigation, and field survey. Based on the information submitted and these efforits,the district engineer shall determine whether the proposed activity has the potential to cause an effect on thehistoric properties. Where the non-Federal applicant has identified historic properties which the activity mayhave the potential to cause effects and so notified the Corps, the non-Federal applicant shall not begin theactivity until notified by the district engineer either that the activity has no potential to cause effects or tl*consultation under Section 106 of the NHPA has been completed.(d) The district engineer will notify the prospective perinittee within 45 days of receipt of a complete pre-construction notification whether NHPA Section 106 consultation is required. Section 106 consultation is notrequired when the Corps determines that the activity does not have the potential to cause effects on historicproperties (see 36 CFR §800.3(a)). If NHPA section 106 consultation is required and will occur, the districtengineer will notify the non-Federal applicant that he or she cannot begin work until Section 106 consultationis completed.(e) Prospective permittees should be aware that section 110k of the NHPA (16 U.S.C. 470h-2(k)) prevents theCorps from granting a penrit or other assistance to an applicant who, with intent to avoid the requirements ofSection 106 of the NHPA, has intentionally significantly adversely affected a historic property to which thepermit would relate, or having legal power to prevent it, allowed such significant adverse effect to occur,unless the Corps, after consultation with the Advisory Council on Historic Preservation (ACHP), determinesthat circumstances justify granting such assistance despite the adverse effect created or permitted by theapplicant. If circumstances justify granting the assistance, the Corps is required to notify the ACHP andprovide documentation specifying the circumstances, explaining the degree of damage to the integrity of anyhistoric properties affected, and proposed mitigation. This documentation must include any views obtainedfrom the applicant, SHPO/THPO, appropriate Indian tribes if the undertaking occurs on or affects historicproperties on tribal lands or affects properties of interest to those tribes, and other parties known to have alegitimate interest in the impacts to the permitted activity on historic properties.

19. Designated Critical Resource Waters. Critical resource waters include, NOAA-designated marinesanctuaries, National Estuarine Research Reserves, state natural heritage sites, and outstanding nationresource waters or other waters officially designated by a state as having particular environmental *Wecological significance and identified by the district engineer after notice and opportunity for public comment.

3

The district engineer may also designate additional critical resource waters after notice and opportunity forcomment.(a) Discharges of dredged or fill material into waters of the United States are not authorized by NWPs 7, 12,14. 16, 17, 21, 29, 31, 35, 39, 40, 42, 43, 44, 49, and 50 for any activity within, or directly affecting, critical

* resource waters, including wetlands adjacent to such waters.(b) For NWPs 3, 8, 10, 13, 15, 18, 19, 22, 23, 25, 27, 28, 30, 33, 34, 36, 37, and 38, notification is required inaccordance with general condition 27, for any activity proposed in the designated critical resource watersincluding wetlands adjacent to those waters. The district engineer may authorize activities under these NWPsonly after it is determined that the impacts to the critical resource waters will be no more than minimal.

20. Mitigation. The district engineer will consider the following factors when determining appropriate andpracticable mitigation necessary to ensure that adverse effects on the aquatic environment are minimal:(a) The activity must be designed and constructed to avoid and minimize adverse effects, both temporary andpermanent, to waters of the United States to the maximum extent practicable at the project site (i.e., on site).(b) Mitigation in all its forms (avoiding, minimizing, rectifying, reducing, or compensating) will be required tothe extent necessary to ensure that the adverse effects to the aquatic environment are minimal.(c) Compensatory mitigation at a minimum one-for-one ratio will be required for all wetland losses thatexceed 1/10 acre and require pre-construction notification, unless the district engineer determines in writingthat some other form of mitigation would be more environmentally appropriate and provides a project-specificwaiver of this requirement. For wetland losses of 1/10 acre or less that require pre-construction notification,the district engineer may determine on a case-by-case basis that compensatory mitigation is required to ensurethat the activity results in minimal adverse effects on the aquatic environment. Since the likelihood of successis greater and the impacts to potentially valuable uplands are reduced, wetland restoration should be the firstcompensatory mitigation option considered.(d) For losses of streams or other open waters that require pre-construction notification, the district engineermay require compensatory mitigation, such as stream restoration, to ensure that the activity results in minimal

adverse effects on the aquatic environment.(e) Compensatory mitigation will not be used to increase the acreage losses allowed by the acreage limits of

the NWPs. For example, if an NrwP has an acreage limit of 1/2 acre, it cannot be used to authorize any projectresulting in the loss of greater than 1/2 acre of waters of the United States, even if compensatory mitigation isprovided that replaces or restores some of the lost waters. However, compensatory mitigation can and shouldbe used, as necessary, to ensure that a project already meeting the established acreage limits also satisfies theminimal impact requirement associated with the NWPs.(f) Compensatory mitigation plans for projects in or near streams or other open waters will normally include arequirement for the establishment, maintenance, and legal protection (e.g., conservation easements) of riparianareas next to open waters. In some cases, riparian areas may be the only compensatory mitigation required.Riparian areas should consist of native species. The width of the required riparian area will addressdocumented water quality or aquatic habitat loss concerns. Normally, the riparian area will be 25 to 50 feetwide on each side of the stream, but the district engineer may require slightly wider riparian areas to addressdocumented water quality or habitat loss concerns. Where both wetlands and open waters exist on the projectsite, the district engineer will determine the appropriate compensatory mitigation (e.g., riparian areas and/orwetlands compensation) based on what is best for the aquatic environment on a watershed basis. In caseswhere riparian areas are determined to be the most appropriate form of compensatory mitigation, the districtengineer may waive or reduce the requirement to provide wetland compensatory mitigation for wetland losses.(g) Penrnittees may propose the use of mitigation banks, in-lieu fee arrangements or separate activity-specificcompensatory mitigation. In all cases, the mitigation provisions will specify the party responsible foraccomplishing and/or complying with the mitigation plan.(h) Where certain functions and services of waters of the United States are permanently adversely affected,#ch as the conversion of a forested or scrub-shrub wetland to a herbaceous wetland in a permanently

aintained utility line right-of-way, mitigation may be required to reduce the adverse effects of the project tothe minimal level.

'I

21. Water Quality. In certain states and tribal lands an individual 401 Water Quality Certification must beobtained or waived (see 33 CFR 330.4(c)). The district engineer may require additional water qualimanagement measures to ensure that the authorized activity does not result in more than minimal degradatof water quality.

22 Coastal Zone Management. In coastal states where an NWP has not previously received a state coastalzone management consistency concurrence, an individual state coastal zone management consistencyconcurrence must be obtained, or a presumption of concurrence must occur (see 33 CFR 330.4(d)). Thedistrict engineer or a State may require additional measures to ensure that the authorized activity is consistentwith State coastal zone management requirements.

23. Regional and Case-By-Case Conditions. The activity must comply with any regional conditions thatmay have been added by the Division Engineer (see 33 CFR 33 0.4(e)) and with any case specific conditionsadded by the Corps or by the state, Indian Tribe, or U.S. EPA in its section 401 Water Quality Certification, orby the state in its Coastal Zone Management Act consistency determination.

24. Use of Multiple Nationwide Permits. The use of more than one NWP for a single and complete projectis prohibited, except when the acreage loss of waters of the United States authorized by the NWPs does notexceed the acreage limit of the NWP with the highest specified acreage limit. For example, if a road crossingover tidal waters is constructed under NWP 14, with associated bank stabilization authorized by NWP 13, themaximum acreage loss of waters of the United States for the total project cannot exceed 1/3-acre.

25. Transfer of Nationwide Permit Verifications. If the permittee sells the property associated with anationwide permit verification, the permittee may transfer the nationwide permit verification to the new ownerby submitting a letter to the appropriate Corps district office to validate the transfer. A copy of the nationwicipermit verification must be attached to the letter, and the letter must contain the following statementsignature:

"When the structures or work authorized by this nationwide permit are still in existence at the time theproperty is transferred, the terms and conditions of this nationwide permit, including any specialconditions, will continue to be binding on the new owner(s) of the property. To validate the transfer ofthis nationwide permit and the associated liabilities associated with compliance with its terms andconditions, have the transferee sign and date below."

(Transferee)

(Date)

26. Compliance Certification. Each permittee who received an NWP verification from the Corps mustsubmit a signed certification regarding the completed work and any required mitigation. The certification mustbe forwarded by the Corps with the NTWP verification letter and will include:(a) A statement that the authorized work was done in accordance with the NWP authorization, including anygeneral or specific conditions;(b) A statement that any required mitigation was completed in accordance with the permit conditions; and(c) The signature of the permittee certifying the completion of the work and mitigation. Ak

27. Pre-Construction Notification. (a) Timin . Where required by the terms of the NWP, the prospectivepermittee-must notify the district engineer by submitting a pre-construction notification (PCN) as early aspossible. The district engineer must determine if the PCN is complete within 30 calendar days of the date ofreceipt and, as a general rule, will request additional information necessary to make the PCN complete onlyonce. However, if the prospective permittee does not provide all of the requested information, then the districtengineer will notify the prospective permittee that the PCN is still incomplete and the PCN review processwill not commence until all of the requested infom-ation has been received by the district engineer. Theprospective permittee shall not begin the activity:(1) Until notified in writing by the district engineer that the activity may proceed under the NWP with anyspecial conditions imposed by the district or division engineer; or(2) If 45 calendar days have passed from the district engineer's receipt of the complete PCN and theprospective pernmittee has not received written notice from the district or division engineer. However, if thepennittee was required to notify the Corps pursuant to general condition 17 that listed species or criticalhabitat might affected or in the vicinity of the project, or to notify the Corps pursuant to general condition 18that the activity may have the potential to cause effects to historic properties, the permittee cannot begin theactivity until receiving written notification from the Corps that is "no effect" on listed species or "no potentialto cause effects" on historic properties, or that any consultation required under Section 7 of the EndangeredSpecies Act (see 33 CFR 330.4(f)) and/or Section 106 of the National Historic Preservation (see 33 CFR330.4(g)) is completed. Also, work cannot begin under NWPs 21, 49, or 50 until the permittee has received.written approval from the Corps. If the proposed activity requires a written waiver to exceed specified limitsof an NWP, the permittee cannot begin the activity until the district engineer issues the waiver. If the districtor division engineer notifies the permittee in writing that an individual permit is required within 45 calendardays of receipt of a complete PCN, the permittee cannot begin the activity until an individual permnt has beenobtained. Subsequently, the permittee's right to proceed under the NWP may be modified, suspended, or

*revoked only in accordance with the procedure set forth in 33 CFR 330.5(d)(2).(b) Contents of Pre-Construction Notification: The PCN must be in writing and include the followinginformation:(1) Name, address and telephone numbers of the prospective permittee;(2) Location of the proposed project;(3) A description of the proposed project; the project's purpose; direct and indirect adverse environmentaleffects the project would cause; any other NOAWP(s), regional general permit(s), or individual permit(s) used orintended to be used to authorize any part of the proposed project or any related activity. The descriptionshould be sufficiently detailed to allow the district engineer to determine that the adverse effects of the projectwill be minimal and to determine the need for compensatory mitigation. Sketches should be provided whennecessary to show that the activity complies with the terms of the NWP. (Sketches usually clarify the projectand when provided result in a quicker decision.);(4) The PCN must include a delineation of special aquatic sites and other waters of the United States on theproject site. Wetland delineations must be prepared in accordance with the current method required by theCorps. The pernaittee may ask the Corps to delineate the special aquatic sites and other waters of the UnitedStates, but there may be a delay if the Corps does the delineation, especially if the project site is large orcontains many waters of the United States. Furthermore, the 45 day period will not start until the delineationhas been submitted to or completed by the Corps, where appropriate;(5) If the proposed activity will result in the loss of greater than 1/10 acre of wetlands and a PCN is required,the prospective pernittee must submit a statement describing how the mitigation requirement will be satisfied.As an alternative, the prospective pennittee may submit a conceptual or detailed mitigation plan.(6) If any listed species or designated critical habitat might be affected or is in the vicinity of the project, or if

*he project is located in designated critical habitat, for non-Federal applicants the PCN must include thename(s) of those endangered or threatened species that might be affected by the proposed work or utilize the

0

designated critical habitat that may be affected by the proposed work. Federal applicants must providedocumentation demonstrating compliance with the Endangered Species Act; and(7) For an activity that may affect a historic property listed on, determined to be eligible for listing on, orpotentially eligible for listing on, the National Register of Historic, Places, for non-Federal applicants the PCNmust state which historic property may be affected by the proposed work or include a vicinity map indicathe location of the historic property. Federal applicants must provide documentation demonstraWtcompliance with Section 106 of the National Historic Preservation Act.(c) Form of Pre-Construction Notification: The standard individual permit application form (Form ENG 4345)may be used, but the completed application form must clearly indicate that it is a PCN and must include all ofthe information required in paragraphs (b)(1) through (7) of this general condition. A letter containing therequired information may also be used.(d) Agency Coordination:(1) The district engineer will consider any comments from Federal and state agencies concerning the proposedactivity's compliance with the terms and conditions of the NWPs and the need for mitigation to reduce theproject's adverse environmental effects to a minimal level.(2) For all NWP 48 activities requiring pre-construction notification and for other NWP activities requiringpre-construction notification to the district engineer that result in the loss of greater than 1/2-acre of waters ofthe United States, the district engineer will immediately provide (e.g., via facsimile transmission, overnightmail, or other expeditious manner) a copy of the PCN to the appropriate Federal or state offices (U.S. FWS,state natural resource or water quality agency, EPA, State Historic Preservation Officer (SHPO) or TribalHistoric Preservation Office (THPO), and, if appropriate, the NMFS). With the exception of NWP 37, theseagencies will then have 10 calendar days from the date the material is transmitted to telephone or fax thedistrict engineer notice that they intend to provide substantive, site-specific comments. If so contacted by anagency, the district engineer will wait an additional 15 calendar days before making a decision on the pre-construction notification. The district engineer will fully consider agency comments received within thespecified time frame, but will provide no response to the resource agency, except as provided below. Thedistrict engineer will indicate in the administrative record associated with each pre-construction notificatthat the resource agencies' concerns were considered. For NWIP 37, the emergency watershed protectionrehabilitation activity may proceed immediately in cases where there is an unacceptable hazard to life or asignificant loss of property or economic hardship will occur. The district engineer will consider any commentsreceived to decide whether the NWP 37 authorization should be modified, suspended, or revoked inaccordance with the procedures at 33 CFR 330.5.(3) In cases of where the prospective permittee is not a Federal agency, the district engineer will provide aresponse to NMFS within 30 calendar days of receipt of any Essential Fish Habitat conservationrecommendations, as required by Section 305(b)(4)(B) of the Magnuson-Stevens Fishery Conservation andManagement Act.(4) Applicants are encouraged to provide the Corps multiple copies of pre-construction notifications toexpedite agency coordination.(5) For NWP 48 activities that require reporting, the district engineer will provide a copy of each report within10 calendar days of receipt to the appropriate regional office of the NMFS.(e) District Engineer's Decision: In reviewing the PCN for the proposed activity, the district engineer willdetermine whether the activity authorized by the NWP will result in more than minimal individual orcumulative adverse environmental effects or may be contrary to the public interest. If the proposed activityrequires a PCN and will result in a loss of greater than 1/10 acre of wetlands, the prospective permittee shouldsubmit a mitigation proposal with the PCN. Applicants may also propose compensatory mitigation for projectswith smaller impacts. The district engineer will consider any proposed compensatory mitigation the applicanthas included in the proposal in determining Whether the net adverse environmental effects to the aquaticenvironmnent of the proposed work are minimal. The compensatory mitigation proposal may be eitherconceptual or detailed. If the district engineer determines that the activity complies with the terms nconditions of the NWP and that the adverse effects on the aquatic environment are minimal, after consider'mitigation, the district engineer will notify the permittee and include any conditions the district engineer

7

deems necessary. The district engineer must approve any compensatory mitigation proposal before the'permittee commences work. If the prospective pernittee elects to submit a compensatory mitigation plan withthe PCN, the district engineer will expeditiously review the proposed compensatory mitigation plan. Thedistrict engineer must review the plan within 45 calendar days of receiving a complete PCN and determinewhether the proposed mitigation would ensure no more than minimal adverse effects on the aquaticenvironment. If the net adverse effects of the project on the aquatic environment (after consideration of thecompensatory mitigation proposal) are determined by the district engineer to be minimal, the district engineerwill provide a timely written response to the applicant. The response will state that the project can proceedunder the terms and conditions of the N-WP.If the district engineer determines that the adverse effects of the proposed work are more than minimal, thenthe district engineer will notify the applicant either: (I) That the project does not qualify for authorizationunder the NWP and instruct the applicant on the procedures to seek authorization under an individual permit;(2) that the project is authorized under the NWP subject to the applicant's submission of a mitigation plan thatwould reduce the adverse effects on the aquatic environment to the minimal level; or (3) that the project isauthorized under the NWP with specific modifications or conditions. Where the district engineer determinesthat mitigation is required to ensure no more than minimal adverse effects occur to the aquatic environment,the activity will be authorized within the 45-day PCN period. The authorization will include the necessaryconceptual or specific mitigation or a requirement that the applicant submit a mitigation plan that wouldreduce the adverse effects on the aquatic environment .to the minimal .level. When mitigation is required, nowork in waters of the United States may occur until the district engineer has approved a specific mitigationplan.

28. Single and Complete Project. The activity must be a single and complete project. The same NWP cannotbe used more than once for the same single and complete proj ect.

Enclosure 1

8

NWP CZM AND WQC STATUS TABLE DELAWARE. NEW JERSEY, PENNSYLVANIA (10-15-07)

INWP # IPCN DE CZM DE WQC INJ CZM NJWQC .P.A'CZM PA WQC

NWP 1 NO ISSUED N/A ISSUED N/A ISSUED N/ANWP 2 NO ISSUED N/A DENIED N/A ISSUED N/AJNWP 3 YES * DENIED # DENIED # DENIED DENIED ISSUED ISSUEDNAP 4 NO ISSUED ISSUED ISSUED ISSUED ISSUED ISSUEDNWP 5 YES ISSUED ISSUED DENIED DENIED ISSUED ISSUEDNWP 6 NO ISSUED ISSUED DENIED DENIED ISSUED ISSUEDNWP 7 YES ISSUED ISSUED DENIED DENIED ISSUED ISSUEDNWP 8 YES DENIED N/A DENIED N/A ISSUED N/ANWP 9 NO ISSUED N/A DENIED N/A ISSUED N/ANWP 10 YES * ISSUED N/A DENIED N/A ISSUED N/ANWP 11 YES ISSUED N/A DENIED N/A ISSUED N/ANWP 12 YES * ISSUED ISSUED DENIED DENIED ISSUED ISSUEDNTWP 13 YES * DENIED # DENIED # DENIED DENIED ISSUED ISSUEDNWP 14 YES * ISSUED ISSUED DENIED DENIED ISSUED ISSUEDNWP 15 YES * ISSUED ISSUED DENIED DENIED ISSUED ISSUEDNWP 16 NO ISSUED ISSUED DENIED DENIED ISSUED ISSUEDNWP 17 YES ISSUED. ISSUED DENIED DENIED ISSUED ISSUEDNWP 18 YES * DENIED # DENIED # DENIED DENIED ISSUED ISSUEDNWP 19 YES * ISSUED ISSUED DENIED DENIED ISSUED ISSUEDNWP 20 NO ISSUED ISSUED DENIED DENIED ISSUED ISSUEDNWP 21 YES ISSUED ISSUED DENIED DENIED ISSUED ISSUEDNWP 22 YES * ISSUED ISSUED DENIED DENIED ISSUED ISSUEDNWP 23 YES * ISSUED ISSUED DENIED DENIED ISSUED ISSUEDNWP 24 NO ISSUED N/A ISSUED N/A ISSUED N/ANWP 25 YES * ISSUED ISSUED DENIED DENIED ISSUED ISSUEDNWP 27 YES * ISSUED ISSUED DENIED DENIED ISSUED ISSUEDNWP 28 YES * ISSUED N/A DENIED N/A ISSUED N/ANWP 29 YES DENIED # DENIED # DENIED DENIED ISSUED ISSUEDNWP 30 YES * ISSUED ISSUED ISSUED ISSUED ISSUED ISSUEDNWP 31 YES ISSUED ISSUED DENIED DENIED ISSUED ISSUEDNWP 32 N/A ISSUED ISSUED DENIED DENIED ISSUED ISSUEDNWP 33 YES ISSUED ISSUED DENIED DENIED ISSUED ISSUEDNWP 34 YES ISSUED ISSUED DENIED DENIED ISSUED ISSUEDNWP 35 NO ISSUED N/A DENIED N/A ISSUED N/ANWP 36 YES * ISSUED ISSUED DENIED DENIED ISSUED ISSUEDNWP 37 YES ISSUED ISSUED ISSUED ISSUED ISSUED ISSUEDNWP 38 YES ISSUED ISSUED DENIED DENIED ISSUED ISSUEDNWP 39 YES DENIED # DENIED # DENIED DENIED ISSUED ISSUEDNWP 40 YES DENIED DENIED DENIED DENIED ISSUED ISSUEDNWP 41 YES * DENIED DENIED DENIED DENIED ISSUED ISSUEDNWP 42 YES DENIED # DENIED # DENIED DENIED ISSUED ISSUEDNWP 43 YES * DENIED DENIED DENIED DENIED ISSUED ISSUEDNWP 44 YES DENIED DENIED DENIED DENIED ISSUED ISSUEDNWP 45 YES ISSUED ISSUED DENIED DENIED ISSUED ISSUEDNWP 46 YES DENIED DENIED DENIED DENIED ISSUEDý ISSUEDNWP 47 NO ** ISSUED ISSUED DENIED DENIED ISSUED ISSUEDNWP 48 YES * ISSUED ISSUED DENIED DENIED ISSUED ISSUEDNWP 49 YES ISSUED ISSUED DENIED DENIED ISSUED ISSUEDNWP 50 1 YES ISSUED ISSUED DENIED DENIED ISSUED ISSUED

Note: * A PCN is required under certain circumstances. Review the terms and conditions of the NWP or,general conditions to identify those circumstances. ** Requires a post construction report. # The State olWDelaware has denied the CZM and WQC for this NWP in critical resource waters only.

Enclosure 2

NOTIFICATION/CERTIFICATION OF WORK COMMENCEMENT FORM

Permit Number: CENAP-OP-R-2006-6232-45State Permit #:Name of Permittee: PUBLIC SERVICE ELECTRIC AND GAS NUCLEAR LLCProject Name: PUBLIC SERVICE ELECTRIC AND GAS NUCLEAR LLCWaterway: Delaware RiverCounty: Salem CounW State: New JerseyCompensation/Mitigation Work Required: Yes 2 No [

TO: U.S. Army Corps of Engineers, Philadelphia DistrictWanamaker Building - 100 Penn Square EastPhiladelphia, Pennsylvania 19107-3390Attention: CENAP-OP-R

I have received authorization to: Continue hydraulic maintenance dredging and desiltingoperations for the Salem circulating and service water intake structures, and discharge pipes, andfor the Hope Creek service water intake structure, and discharge pipe.

The work will be perforined by:

Name of Person or Firm

Address:

I hereby certify that I have reviewed the approved plans, have read the terms andconditions of the above referenced permit, and shall perform the authorized work in strictaccordance with the permit document. The authorized work will begin on or aboutand should be completed on or about

Please note that the permitted activity is subject to compliance inspections by the ArmyCorps of Engineers. If you fail to return this notification form or fail to comply with the terns orconditions of the permit, you are subject to permit suspension, modification, revocation, and/orpenalties.

Permittee (Signature and Date) Telephone Number

Contractor (Signature and Date) Telephone Number

NOTE: This form shall be completed/signed and returned to the Philadelphia DistrictOffice a minimum of 10 days prior to commencing work.

Enclosure 3

NOTIFICATION/CERTIFICATION OF WORIK COMPLETION/COMPLIANCE FORM

Permit Number: CENAP-OP-R-2006-6232-45State Permit #:Name of Penrmittee: PUBLIC SERVICE ELECTRIC AND GAS NUCLEAR LLCName of Contractor:Project Name: PUBLIC SERVICE ELECTRIC AND GAS NUCLEAR LLCCounty: Salem State: New JerseyWaterway: Delaware River

Within 10 days of completion of the activity authorized by this permit, please sign thiscertification and return it to the following address:

U.S. Army Corps of Engineers, Philadelphia DistrictWanamaker Building - 100 Penn Square EastPhiladelphia, Pennsylvania 19107-3390Attention: CENAP-OP-R

Please note that the permitted activity is subject to a compliance inspection by an Army Corps ofEngineers representative. If you fail to return this notification form or fail to perform work incompliance with the permit, you are subject to administrative, civil and/or criminal penalties.Further, the subject permit may be suspended or revoked.

The authorized work was commenced on

The authorized work was completed on

I hereby certify that the work authorized by the above referenced permit has been completed inaccordance with the terms and conditions of the above noted permit.

Signature of Contractor Signature of Permittee

Address: Address:

Telephone Number: Telephone Number:

For project located in areas identified as shellfish habitat, you must include with this form a billof lading; sales order or any other document(s) demonstrating non-polluting materials werepurchased and utilized for your project. I hereby certify that I and/or my contractor have utilizednon-polluting materials as defined in the above noted permit.

Signature of Contractor Signature of Permittee

Enclosure 4

ATTACHMENT

PRELIMINARY JURISDICTIONAL DETERMINATION FORM

BACKGROUND INFORMATION

A. REPORT COMPLETION DATE FOR PRELIMINARY JURISDICTIONALDETERMINATION (JD): June 16, 2008

B. NAME AND ADDRESS OF PERSON REQUESTING PRELIMINARY JD:

Mr. Christopher E. WhitePSEG Nuclear LLCP.O. Box 236Hancock Bridge, New Jersey 08038-0236

C. DISTRICT OFFICE, FILE NAME, AND NUMBER: Philadelphia District,PUBLIC SERVICE ELECTRIC AND GAS NUCLEAR LLC, CENAP-OP-R-2006-6232

D. PROJECT LOCATION(S) AND BACKGROUND INFORMATION:(USE THE ATTACHED TABLE TO DOCUMENT MULTIPLE WATERBODIESAT DIFFERENT SITES)

State: New Jersey County/parish/borough: Salem County City-

Center coordinates of site (lat/long in degree decimal format): Lat. 39.46475'N, Long. -75.5437666666667" W.

Universal Transverse Mercator:Name of nearest waterbody: Delaware River

Identify (estimate) amount of waters in the review area:Non-wetland waters: linear feet: width (ft) and/or 10.3 acresCowardin Class: RiverineStream Flow: PerennialWetlands: acres.Cowardin Class:

Name of any water bodies on the site that have been identified as Section 10waters:

Tidal: Delaware RiverNon-Tidal:

E. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THATAPPLY):

Z Office (Desk) Determination. Date: June 16, 2008.D-I Field Determination. Date(s):

1

1. The Corps of Engineers believes that there may be jurisdictional waters of theUnited States on the subject site, and the permit applicant or other affected partywho requested this preliminary JD is hereby advised of his or her option torequest and obtain an approved jurisdictional determination (JD) for that site.Nevertheless, the permit applicant or other person who requested thispreliminary JD has declined to exercise the option to obtain an approved JD inthis instance and at this time.

2. In any circumstance where a permit applicant obtains an individual permit, ora Nationwide General Permit (NWP) or other general permit verification requiring"pre-construction notification" (PCN), or requests verification for a non-reportingNWP or other general permit, and the permit applicant has not requested anapproved JD for the activity, the permit applicant is hereby made aware of thefollowing: (1) the permit applicant has elected to seek a permit authorizationbased on a preliminary JD, which does not make an official determination ofjurisdictional waters; (2) that the applicant has the option to request an approvedJD before accepting the terms and conditions of the permit authorization, andthat basing a permit authorization on an approved JD could possibly result in lesscompensatory mitigation being required or different special conditions; (3) thatthe applicant has the right to request an individual permit rather than acceptingthe terms and conditions of the NWP or other general permit authorization; (4)that the applicant can accept a permit authorization and thereby agree to complywith all the terms and conditions of that permit, including whatever mitigationrequirements the Corps has determined to be necessary; (5) that undertakingany activity in reliance upon the subject permit authorization without requestingan approved JD constitutes the applicant's acceptance of the use of thepreliminary JD, but that either form of JD will be processed as soon as ispracticable; (6) accepting a permit authorization (e.g., signing a profferedindividual permit) or undertaking any activity in reliance on any form of Corpspermit authorization based on a preliminary JD constitutes agreement that allwetlands and other water bodies on the site affected in any way by that activityare jurisdictional waters of the United States, and precludes any challenge tosuch jurisdiction. in any administrative or judicial compliance or enforcementaction, or in any administrative appeal or in any Federal court; and (7) whetherthe applicant elects to use either an approved JD or a preliminary JD, that JDwill be processed as soon as is practicable. Further, an approved JD, a profferedindividual permit (and all terms and conditions contained therein), or individualpermit denial can be administratively appealed pursuant to 33 C.F.R. Part 331,and that in any administrative appeal, jurisdictional issues can be raised (see 33C.F.R. 331.5(a)(2)). If, during that administrative appeal, it becomes necessaryto make an official determination whether CWA jurisdiction exists over a site, orto provide an official delineation of jurisdictional waters on the site, the Corps willprovide an approved JD to accomplish that result, as soon as is practicable.This preliminary JD finds that there "may be" waters of the United States on thesubject project site, and identifies all aquatic features on the site that could beaffected by-the proposed activity, based on the following information:

2

SUPPORTING DATA. Data reviewed for preliminary JD (check all that apply- checked items should be included in case file and, where checked andrequested, appropriately reference sources below):r[] Maps, plans, plots or plat submitted by or on behalf of theapplicant/consultant: S.T. Hudson Engineers, Inc.Li Data sheets prepared/submitted by or on behalf of theapplicant/consultant.

Di office concurs with data sheets/delineation report.[i Office does not concur with data sheets/delineation report.

[- Data sheets prepared by the Corps:Z Corps navigable waters' study: Corps maintained Federal NavigationChannel..L- U.S. Geological Survey Hydrologic Atlas:

Li USGS NHD data.Li USGS 8 and 12 digit HUC maps.

'7 U.S. Geological Survey map(s). Cite scale & quad name: Taylors BridgeQuad/7.5 min.Li USDA Natural Resources Conservation Service Soil Survey. Citation:

i National wetlands inventory map(s). Cite name:-7 State/Local wetland inventory map(s):

Li FEMA/FIRM maps:Li 100-year Floodplain Elevation is: (National Geodectic Vertical Datumof 1929)Z Photographs: L-i Aerial (Name & Date):

or ýý Other (Name & Date):Google Earth/ 2006.Li Previous determination(s). File no. and date of response letter:Li Other information (please specify):

IMPORTANT NOTE: The information recorded on this form has notnecessarily been verified by the Corps and should not be relied upon forlater iurisdictional determinations.

Signfature and date ofRegulatory Project Manager(REQUIRED)

Signature and date ofperson requesting preliminary JD(REQUIRED, unless obtaining

the signature is impracticable)

3

05 nlED MM~bR ffwNEVmlw2

DEPARTMENT OF THE ARMY N0N-PPHILADELPHIA DISTRICT CORPS OF ENGINEERS

WANAMAKER BUILDING, 100 PENN SQUARE EASTPHILADELPHIA. PENNSYLVANIA 19107-3390

OFEB. 17 2010Regulatory BranchApplications Section I

SUBJECT: CENAP-OP-R-2006-6232PSE&G SALEM AND HOPE CREEK STATIONS

NJDEP #: 1704-02-0001.6, WFD-080001

Mr. Jonathan SearsPSE&G Nuclear, LLCP.O. Box 236Hancocks Bridge, New Jersey 08038-0236

Dear Mr. Sears:

This is in regard to your application for a Department of the Army permit dated January 28,2010. Upon recommendation of the Chief of Engineers and under provision of Section 10 of theRivers and Harbors Act of March 3, 1899, PSE&G Nuclear, LLC is authorized by the Secretaryof the Army to perform mechanical maintenance dredging to remove 2,763 cubic yards ofmaterial from within the Hope Creek Barge Slip, located at the Salem and Hope Creek Nuclear

* Generating Stations, on Artificial Island, Block 26, Lots 4, 4.01 and 5.01, in Lower AllowayTownship, Salem County, New Jersey. This activity shall be conducted in accordance with theenclosed plans (Enclosure 1) and subject to the enclosed conditions (Enclosure 2). The statedpurpose of this activity is to restore the barge slip to previous authorized depths to maintain safenavigation for barge loading and unloading, and/or facility operations.

Carefully review all the terms and conditions of the Department of the Army permit andunderstand them fully. Performing any work not specifically authorized by the permit or failingto comply with its conditions may subject you and/or your contractor to the enforcementprovisions of our regulations. If a contractor performs the work for you, both you and thecontractor are responsible for assuring the work is done in conformance with the conditions andlimitations of this permit. Please be sure the person who will do the work has read andunderstands the conditions of the permit.

This letter contains an initial proffered letter of permission for your activity. If you objectto this permit decision because of certain terms and conditions therein, you may request that thepermit be modified accordingly under Corps regulations at 33 CFR 331. Enclosed you will finda combined Notification of Appeal Process (NAP) and Request for Appeal (RFA) form(Enclosure 3). If you object to this permit decision, you must submit a completed RFA form tothe Philadelphia District Office at:

.ft

-2-

Bryan BellacimaU.S. Army Corps of EngineersPhiladelphia DistrictATTN: CENAP-OP-RWanamaker Building, 100 Penn Square EastPhiladelphia, PA 19107-3390

In order for an RFA to be accepted by the Corps, the Corps must determine that it iscomplete, that it meets the criteria for appeal under 33 CFR Part 331.5, and that it has beenreceived by the District Office within 60 days of the date of the NAP. Should you decide tosubmit an RFA form, it must be received at the above address by 4 _. 9 201 0

It is not necessary to submit an RFA form to the District Office if you do not object to thepermit decision in this letter.

In addition, the attached plans, a preliminary jurisdictional determination (JD) is includedwith this Department of the Army permit. This preliminary determination identifies thelocation(s) of waters and wetlands that may be waters of the United States for the subject site.This preliminary jurisdictional determination is non-binding and indicates that there may bewaters of the United States, including wetlands, on the parcel. Enclosed is a copy of thePreliminary Jurisdictional Determination Form signed by the applicant or agent agreeing toaccept a preliminary jurisdictional determination (Enclosure 5). Preliminary JDs are advisory innature and may not be appealed (See attached Notification of Appeal Form (Enclosure 3) and 33C.F.R. 331.2.); however, the applicant retains the right to request an approved JurisdictionalDetermination, which may be appealed, for the site.

For purposes of computation of impacts, compensatory mitigation requirements, and otherresource protection measures, a permit decision was made based on the preliminary JD. Allwaters and wetlands on the site that may be affected in any way by the permitted activity weretreated as though they were jurisdictional waters of the United States. The attached plan(s)depicts the location of waters and wetlands on the subject property.

This determination may not be valid for the wetland conservation provisions of the FoodSecurity Act of 1985, as amended. If you or your tenant are U.S. Department of Agriculture(USDA) program participants, or anticipate participating in USDA programs, you should requesta certified wetland determination from the local office of the Natural Resources ConservationService prior to starting work.

This letter is valid for a period of five (5) years. This preliminary jurisdictionaldetermination is issued in accordance with current Federal regulations and is based upon theexisting site conditions and information provided by you in your application. This officereserves the right to reevaluate and modify the preliminary jurisdictional determination at any

-32-

time should existing site conditions or Federal regulations change, or should the informationprovided by you prove to be false, incomplete, or inaccurate.

Enclosed is your notice of authorization, ENG FORM 4336 (Enclosure 4), which must beconspicuously displayed at the site of work. The issuance of this permit does not obviate youfrom your responsibility to obtain any other Federal, State or local approvals required by law forthis work.

This office shall be notified of the commencement and completion of the permitted work.To assist you in meeting this requirement, enclosed is a Notification/Certification of WorkCommencement Form (Enclosure 6) for you to fill out and return to us at least 10 days prior tothe time you intend to begin work. Similar notification is required each time any maintenancework is to be done under this permit. In addition, the enclosed Notification/ Certification ofWork Completion/Compliance (Enclosure 7) should be signed and returned to this office within10 days after the permitted work is completed. Also enclosed is a pre-addressed postal card(Enclosure 8) soliciting your comments on the processing of your permit. Any comments,positive or otherwise, on the procedures, timeliness, fairness, etc., may be made on this card.You may forward your comment card along with the signed Notification/Certification of WorkCommencement Form.

Additional information concerning either this permit or the approved jurisdictionaldetermination may be obtained by writing to Bryan Bellacima at the above address or callingbetween the hours of 1:00 and 3:30 p.m. at (215) 656-6732.

1BY AUTHORITY OF THE SECRETARY OF THE ARMY:

r r . ýan rami4 Ch1i~ef, Regulatory ~ranch7

for Thomas J. TicknerLieutenant Colonel, Corps of EngineersDistrict Commander

Enclosures

O0US Army Corpsof EngineersPhiladelphia District

NOTICE

This Department of the Army permit contains importantpermit terms and conditions. Please read the permit and allterms and conditions carefully.

Work authaorized by thpermit may be rispected forcompliance at any time.

It is your respo0ns y, as perMitee,-to ensure that allwork authorized by the :permit, J#6ludng all work performed bycontractors, be perform-ed in strict compliance with all termsand conditions of the permit. Failure to do so may result in adetermination by the District.ngieer to s Ispend, modify, orrevoke your permit (33 CFR I5.7). It may also subject you tothe enforcement procedures co~tained at*33 CFR 326.4 and326.5, includmig civil and criialaction and the possibleimposition of civt penaties pad crimWnal fnes up to $50,000. 00per day per vioation. .

If you haveaiiyquestois a-boity or need to modify, any ofthe terms and conditions of this permit, you are requested tocontact the Philadelphia Distiict Offieat (2.5) 656-6728.

I

V /.

1~ ~t

I.

1114

'II -~

1 4

7. / **i~

1~ J>~~ 4 f( ~

*1 .~4. .)~ (~ ~r-

*

FA

/ f-i ~L 2-i..

+-r~>

_41 IN~

eI a

.TI N 3,::•LAT~i I TUE 39275345 •ipi•I

• i . .. .. i . .. .. I .. . .... .Ti • •ii

W.

~7~1I

. . . i.- .... r. ... :,•. -

• ••,.: . . .".."',".

*0

N

N

Rn1-

I-

Redý111 -Substs T19W1.16f,

74

fly,

Sh7`7 PISMAI

W1

f ' * :!:•ii

PROJECT SITE LOCATION MAP

USGS QUDAGEMAP

TAYLORS BRIDGE, DELAWARE/NEW JERSEY

• ; ": ....i: i .'.:•:• ;X ::. :: '::)) ::,: ::•, H- Ei57s:';

04f~ S. T. HUDSON ENGINEERS, INC.

0' ,

/

I TI T

-lbIb

iDE N 390

'26

v-4.

Cl-"

/ 4~~-- ~ ~~' _ Fr M~4 +

, • T • r ,• . ... • 1 1 I I III I I Lll I

. I• ... .. !

I,~K

4V

a'

', 2#

i~ I~

.i

/.,.

.IN.

r~4

330

S-ALL

POW __________

. . . • - .I I

DREDGE DISPOSAL SITE LOCATION MAPUSGS •UIADRANGLE MAP

TAYLORS BRIDGE, DELAWARE/NEW JERSEY

H-657a

iS. T. HUDSON ENGINEERS, INC,

A-

4

t~19

14

N 23004

4.Tj 3,C4

0110.

4. t4 22,500+

4-

.4+4 2350

A-

DATUM CHART:REFERNC 8101AITOP OF DECK 0•RCUtAW4WATER IMThXE M1JUMtNGELmVAInOI" (+1&1 ULW. DATUM)

HIGHIWE UNE +W.

MEAN-LOW WATER 0.0

NOTES:1. ALL SOUNDINIGS WERE MS0 USM1 A CIMEREMT1 J.W2W POSIflDOG

MM (DGPS), HYPACK W SOWIR MD AN OERSPACE "•ECN0 ,INC. 448 CO NUoUS RECORNG SV FAM ET

2Z DECIMA P0114T ()DENOTE 7WE WC1TDN Or TIRE SOUNDMN.

3 SOUNDINIM ARC RE E To MEANLOWWATER•P.W) AND AREEXPRESED IN 1Er AND RET OF A FOOT.

4. HORIZONAL CONTRIM S IM N5VMY STATE PMAN CORINATES,NA' 1983 AS SUFUIED BY PS.E. G •.

5. CONTOURS MU NRMLATED USKG TRMM.E NAMATI4N UMTERRAMODEL VERSION 10.'1.

*1N

t423 00

%A

Q-1

0

w4-

US

OVERALL SITE PLANSCAJ. i7 - 50W

0 200 400 7M0

Ion 300 500

FIE~~NAL DEW~N REWUIRED FOR CONSTRUCTION

S. Tý Hucs-0N epG~mk INC.

FILE No.CONTRACT No.DATESHEET No.

PI-2071H-65781/27/2010I OF 6

PROPOSED: MIIKfEWAtCE OR.DI NG

AT; fK0PE CRME AG SUP - DELAWARE RIME

M•-.,WS OF: SAM O•.., WW MEY

APPUCAION BY: P.S.E. & G. HOPE CMEEK

F fl., 3

_ I3A0 tN23 40

X 233,2M0+

0

rt

- . *

* IRs

PROPOSED DREDGE UMITSAREA: 15,180 SQ. FT.

+FN 2M,000 +

TIDE LINE +6.1' (M.LW.)

+•

+ N 23A00

I

)

PARTIAL SITE PLANSUALE t, - 100'

0 40 OD 150

6?%ewmmmý20 60 100

+

I

+

FILE No.CONTRACTDATE"' ,SHEET No,

PI-2071No, H1-6578

1/2.7/20102OF 6

AME FINAL DESIGN. REQUIRED FOR CONSTRUCTION

95 T. NLUDt1N MNGlINEE-RSv 9Nt.

PFx No. 666-Z42-'832Z

PROPOSED: UMMNT CE DREDGI

Mz PE CWE MM~G SUP - DELAWAqRI VER

W( ip AWM- 000"" R*W AmS

APPUCAlION BY R-S.L & G~. HOPE CREEK

I

N

11

000.-

I0.-

-ý 0-

.w 00 0w

CL a

w

NT:FINAL DESIGN REQUIRED FOR CONSTRUCTION

S. Tý HUEDSN ENGIN-EER91 INC.PROV-iSOAL CNM.MrIVPkS & FNSL5LTANTS

640 C-0ýPv. $str0

comdan. Ný... 08102roXc No,. 850 4At2-032ý$ s5sý-342.-6000

..

It in

.•,-4

N .7

oA• II -IIo~

ow

001

FILI Mo 127COuATN.H6T

FILE No /1P/2071

SHEET No. 3 Or 6

@PROPOSED: MAWINENANCE DREDGIN• G

AT;, HOPE CIEE SWE SUP - DELAWARE R•,,E

MMY M ,M- 050.•G Y, M j ,,

APPUcATION BY: P.S.E. & G. HOPE CREEK

f-ý S-

6Mi&r COPA7 nMv W~ OM M~P OF M6 PZAr aajY MONI AT 'AP#IM& FRPMýE~~ V &V05SS Z4 RM41 Kcaimpm V BE KW JCW c&

mw pur m(s sEv mLwo Vff Th 89&7 OF A MWRARZ W1 CMFMM AND/~ae Nl MLYPSM tY &RWAIFX MIE

A T/ C " ".T "If XU "OZW fl W •• S ,/W A,' AVARIM O ORRMS -CV-19C

flC awa Or MS1 OWW 5' PE AIV?7 Or FMAMiem 10 .

WO /RESWAM? NAh4VO AS PMW~Z BY 7h MW " "SY7RjW4)Mi ffAAWM MMMA7~~hW AOT .(A4AfX19-t a A&MMIA7 M7 X ShM7I'6W (M MMOA~4 AS' PA~r at- MY~ SU

235,000

C

GENERAL NOTES

1. TA"' AIW i•WX" - L$faer 14

&W 25LOT 1 &2

2. 5a9AaMW Or R= AMXW4 A'A2,~ f .O• M IYFA P,M7V IV

mIw I" j1w=4 mw4~

N

I

I

48

-N 234,000

0,

LuwU

DISPOSAL SITE PLAN

0 30 0 160 270

60 zo 190

FILE No.CONTRACTDATE

PR-2071No. H-6578

1/27/2010SHEt I No.'.... T- . ....

PROPOSED M DOSAL OF UIMMTENN ORMDIIGAFINAL DESIGN REQUIRED FOR CONSTRUCTION

S. T. HUM•SOM3 EN•lNMCMS:, 114C.

Cam.dren N.•J• 087,02P'= Ne. 6Z6--k94S42 Z2 a&*-3*42-0600

AT, F.ML .& 0. SAtMV OREDU DISF0MA SIT

COM a- =14 com. -RW jam

APPUCAMION BY: P.S. & 0. HOPE CRE

F, ý(

MyL

VZ

2i N iPROFILE 'A-A'

SCALE HOIZ..- I' -io8'/VR. I"

[AMOE: FINAL DESIGN REQUIRED FOR CONSTRUCTION

S. T. HUDSO~N ENQGINEERS, INC.PQaE-crf0NAL CENGINCEEng' 00ONSW-TANITS

04 Coopr atra&tW

cam'dwn. HNd. 051302

FILE No. PI-2071CONTRACT No, H'-6578DATE 1/27/200SHEET No. 5 OF 6

PROPOSED: DISPOSAL OF UMAtENANCE DREDGING

AT: P.S.E. Q SAL E R.DISPOSALsi

COM~I OR~ " Mr.I, wEv JMRSY

APPLIGATTON SY P.S.E. & G. HOPE GREEK

F- 7

4M-

r4

_____________ MaE

14g.

______ __ 7do

)ýV -U MWBM

7

i

i7

FL 'Cafam WA 7zw,-•

-PRO-FILE 'C-C'

q )

PROFILE 'B-B'MIE MO~Z r~ - WeOyE~ 7 - 8

SCAJLE ROMI 1'.- I8G'IVM~. I" - 1V

FILE Nb. PI-2071CONTRACT No. H-657•8DATE 1/27/2010SHEET No. 6 OF 6

PROPOSED. DISPOSAL OF VIMNTENWNE OEDMINGFINAL DESIGN~ REQIIRWD FOR CONSTRUCTION

SM-M2AL CN Nte- & =N5ULtAMV-!eoc3 0.*t- rstew4t

P'urth M-*6tCamdner. M..J4 05102

F.S~r. & Cy, SAKW* MOE 8tSP~aX SU~EI I

V

APPLICATION BY. P.S.E. k. G. HOPE CREEK(

E-y~

- I

W I Attached is: 1 See Section'beTcvw'-INITIAL PROFFERED PERMIT (Standard Permit or Letter of permission) A

D PROFFERED PERMIT (Standard Permit or Letter of permission) B

ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the Philadelphia DistrictEngineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work isauthorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety,and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations (JD)associated with the permit.

* OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request thatthe pennit be modified accordingly. You must complete Section Il of this form and return the form to the Philadelphia DistrictEngineer. Your objections must be received by the Philadelphia District Engineer xwfithin 60 days of the date of this notice, oryou will forfeityour right to appeal the permit in the future. Upon receipt of your letter, the Philadelphia District Engineer willevaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some'of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. Afterevaluating your objections, the Philadelphia District Engineer will send you a proffered permit for your reconsideration, asindicated in Section B below.

B: PROFFERED PERMIT: You may accept or appeal the permit

ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the Ph-iladelphia DistrictEngineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work isauthorized. Your signature on the Standard Permit or-acceptance of the LOP means that you accept the permit in its entirety,and waive all rights to appeal the permit including its terms and conditions, and approved jurisdictional determinationsassociated with the permit.

APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, youmay appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section HI of thisform and sending the form to the North Atlantic Division Engineer, ATTN: CENAD-PD-PSD-O, Fort Hamilton MilitaryCommunity, Building 301, General Lee Avenue, Brooldyn, NY 11252-6700. This form must be received by the North AtlanticDivision Engineer within 60 days of the date of this notice with a copy furnished to the Philadelphia District Engineer.

C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process bycompleting Section II of this forn and sending the form to the North Atlantic Division Engineer, ATTN: CENAD-PD-PSD-O, FortHantilton Military Community, Building 301, General Lee Avenue, Brooldyn, NY 11252-6700. This form must be received by theNorth Atlantic Division Engineer within 60 days of the date of tlhis notice with a copy furnished to the Philadelphia DistrictEngineer.

D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide newinformation.

ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps w•ithin 60 days of the date* of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JID.

APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers AdministrativeAppeal Process by completing Section II of this form and sending the form to the North Atlantic Division Engineer, ATTN:CENAD-PD-PSD-O, Fort Hamilton Military Community, Building 301, General Lee Avenue, Brooklyn, NY 11252-6700. Thfisform must be received by the North Atlantic Division Engineer within 60 days of the date of this notice with a copy furnished tothe Philadelphia District Engineer.

E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding thepreliminary JD. The Preliminary JD is not appealable. If you wish, you may reqtiest an approved JD (which may beappealed), by contacting the Corps district for further instruction. Also you may provide new information for furtherconsideration by the Corps to reevaluate the JD. 5

I ý .. ... ................ I ......... -S~~~~~~CTXON ~ ~ ~ ~ ~ ~ ~ ~ M M., M.,QJS O IR~rO3R~OST~NTf~IL~~JIDPRf7

xX

REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to aninitial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasonsor objections are addressed in the administrative record,)

ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for therecord of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed toclarify the administrative record, Neither the appellant nor the Corps may add new information or analyses to the record, However,you may provide additional information to clarify the location of information that is already in the administrative record.

POINT O1~ ONTAI~O1~ OXJIS~h~S 'ORtNP~ AON**...,****,,.**........If you have questions regarding this decision and/or the appeal If you only have questions regarding the appeal process you mayprocess you may contact: also contact:

Mr. Michael G, VissichelliBryan P. Bellacimna Administrative Appeals Review OfficerU.S. Army Corps of Engineers, Philadelphia District North Atlantic Division, Corps of Engineers Fort HamiltonATTN: CENAP-OP-R Military Community Bldg. 301, General Lee Avenue Brooklyn,Wanamaker Building, 100 Penn Square East NY 11252-6700Philadelphia, PA 19107-3390 Telephone: (718) 765-7163Telephone: (215) 656-6732 Email: Michael. [email protected] OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any governmentconsultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 daynotice of any site investigation, and will have the opportunity to participate in all site investigations.

Date: Telephone number:

Signature of appellant or agent.

EnclosurW

ATTACHMENT

PRELIMINARY JURISDICTIONAL DETERMINATION FORM

BACKGROUND INFORMATION

A. REPORT COMPLETION DATE FOR PRELIMINARY JURISDICTIONALDETERMINATION (JD): January 28, 2010

B. NAME AND ADDRESS OF PERSON REQUESTING PRELIMINARY JD:

Mr. Kevin CaseyEnvironmental Specialist.S.T. Hudson Engineers, Inc.840 Cooper Street-Fourth FloorCamden, New Jersey 08102

C. DISTRICT OFFICE, FILE NAME, AND NUMBER: Philadelphia District,PUBLIC SERVICE ELECTRIC AND GAS NUCLEAR LLC, CENAP-OP-R-2006-6232

D. PROJECT LOCATION(S) AND BACKGROUND INFORMATION:

(USE THE ATTACHED TABLE TO DOCUMENT MULTIPLE WATERBODIESAT DIFFERENT SITES)

State: New Jersey County/parishlborough: Salem County City:

Center coordinates of site (lat/long in degree decimal format): Lat. 39.464750N, Long. -75.5437666666667° W.

Universal Transverse Mercator:

Name of nearest waterbody: Delaware River

Identify (estimate) amount of waters in the review area:

Non-wetland waters: linear feet: width (ft) and/or 0.348Cowardin Class: RiverineStream Flow: Perennial

Wetlands: acres.

Cowardin Class:

Name of any water bodies on the site that have been identified as Section 10waters:

Tidal: Delaware River

Non-Tidal:

ENCLOSURE 5

E. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THATAPPLY):

[ Office (Desk) Determination. Date: January 28, 2010.

[- Field Determination. Date(s):

1. The Corps of Engineers believes that there may be jurisdictional waters of theUnited States on the subject site, and the permit applicant or other affected partywho requested this preliminary JD is hereby advised of his or her option torequest and obtain an approved jurisdictional determination (JD) for that site.Nevertheless, the permit applicant or other person who requested thispreliminary JD has declined to exercise the option to obtain an approved JD inthis instance and at this time.

2. In any circumstance where a permit applicant obtains an individual permit, ora Nationwide General Permit (NWP) or other general permit verification requiring"pre-construction notification" (PCN), or requests verification for a non-reportingNWP or other general permit, and the permit applicant has not requested anapproved JD for the activity, the permit applicant is hereby made aware of thefollowing: (1) the permit applicant has elected to seek a permit authorizationbased on a preliminary JD, which does not make an official determination ofjurisdictional waters; (2) that the applicant has the option to request an approvedJD before accepting the terms and conditions of the permit authorization, andthat basing a permit authorization on an approved JD could possibly result in lesscompensatory mitigation being required or different special conditions; (3) thatthe applicant has the right to request an individual permit rather than acceptingthe terms and conditions of the NWP or other general permit authorization; (4)that the applicant can accept a permit authorization and thereby agree to complywith all the terms and conditions of that permit, including whatever mitigationrequirements the. Corps has determined to be necessary; (5) that undertakingany activity in reliance upon the subject permit authorization without requestingan approved JD constitutes the applicant's acceptance of the use of thepreliminary JD, but that either form of JD will be processed as soon as is.practicable; (6) accepting a permit authorization (e.g., signing a profferedindividual permit) or undertaking any activity in reliance on any form of Corpspermit authorization based on a preliminary JD constitutes agreement that allwetlands and other water bodies on the site affected in any way by that activityare jurisdictional waters of the United States, and precludes any challenge tosuch jurisdiction in any administrative or judicial compliance or enforcementaction, or in any administrative appeal or in any Federal court; and (7) whetherthe applicant elects to use either an approved JD or a preliminary JD, that JDwill be processed as soon as is practicable. Further, an approved JD, a profferedindividual permit (and all terms and conditions contained therein), or individualpermit denial can be administratively appealed pursuant to 33 C.F.R. Part 331,and that in any administrative appeal, jurisdictional issues can be raised (see 33C.F.R. 331.5(a)(2)). If, during that administrative appeal, it becomes necessaryto make an official determination whether CWA jurisdiction exists over a site, or

2

to provide an official delineation of jurisdictional waters on the site, the Corps willprovide an approved JD to accomplish that result, as soon as is practicable.This preliminary JD finds that there "may be" waters of the United States on thesubject project site, and identifies all aquatic features on the site that could beaffected by the proposed activity, based on the following information:SUPPORTING DATA. Data reviewed for preliminary JD (check all that apply

- checked items should be included in case file and, where checked andrequested, appropriately reference sources below):Z Maps, plans, plots or plat submitted by or on behalf of theapplicant/consultant: S.T. Hudson Engineers, Inc.- Data sheets prepared/submitted by or on behalf of the

applicant/consultant.D- Office concurs with data sheets/delineation report.D-1 Office does not concur with data sheets/delineation r'eport.

F Data sheets prepared by the Corps:N Corps navigable waters' study: Corps maintained Federal NavigationChannel..

R U.S. Geological Survey Hydrologic Atlas:

El USGS NHD data.F- USGS 8 and 12 digit HUC maps.

N; U.S. Geological Survey map(s). Cite scale & quad name: Taylors BridgeQuad/7.5 min.

E] USDA Natural Resources Conservation Service Soil Survey. Citation:

- National wetlands inventory map(s). Cite name:

F- State/Local wetland inventory map(s):

E- FEMA/FIRM maps:

[--1 100-year Floodplain Elevation is: (National Geodectic Vertical Datumof 1929)

t• Photographs: R-] Aerial (Name & Date):or Z Other (Name & Date):Google Earth/ 2006.

Fl Previous determination(s). File no. and date of response letter:

E] Other information (please specify):IMPORTANT NOTE: The information recorded on this form has notnecessarily been verified by the Corps and should not be relied upon forlater jurisdictional determinations.

Signature and date of Signature and date ofRegulatory Project Manager person requesting preliminary JD(REQUIRED) (REQUIRED, unless obtaining

the signature is impracticable)

3

a I . ý

SAMPLEEstimated

Site Cowardin amount of Class ofLatitude Longitude aquatic aquaticnumber Class resource in resource

review areaI

2

3

4

4

NOTIFICATION/CERTIFICATION OF WORK COMMENCEMENT FORM

Permit Number: CENAP-OP-R-2006-6232-45State Permit #: 1704-02-0001.6, WFD-08000IName of Permittee: PUBLIC SERVICE ELECTRIC AND GAS NUCLEAR- LLCProject Name: PSE&G SALEM AND HOPE CREEK STATIONWaterway: Delaware RiverCounty: Salem County State: New JerseyCompensation/Mitigation Work Required: Yes 0 No Z

TO: U.S. Army Corps of Engineers, Philadelphia DistrictWanamaker Building - 100 Penn Square EastPhiladelphia, Pennsylvania 19107-3390Attention: CENAP-OP-R

I have received authorization to: To perform mechanical maintenance dredging within the HopeCreek Barge slip.

The work will be performed by:

Name of Person or Firm

Address:

I hereby certify that I have reviewed the approved plans, have read the terms andconditions of the above referenced permit, and shall perform the authorized work in strictaccordance with the permit document. The authorized work will begin on or aboutand should be completed on or about

Please note that the permitted activity is subject to compliance inspections by the ArmyCorps of Engineers. If you fail to return this notification form or fail to comply with the terms orconditions of the permit, you are subject to permit suspension, modification, revocation, and/orpenalties.

Permittee (Signature and Date) Telephone Number

Contractor (Signature and Date). Telephone Number

NOTE: This form shall be completed/signed and returned to the Philadelphia DistrictOffice a minimum of 10 days prior to commencing work.

Enclosure 6

NOTIFICATION/CERTIFICATION OF WORK COMPLETION/COMPLIANCE FORM

Permit Number:State Permit #:Name of Permittee:Name of Contractor:Project Name:County:Waterway:

CENAP-OP-R-2006-6232-451704-02-0001.6, WFD-080001PUBLIC SERVICE ELECTRIC AND GAS NUCLEAR, LLC

PSE&G SALEM AND HOPE CREEK STATIONSalem State: New JerseyDelaware River

Within 10 days of completion of the activity authorized by this permit, please sign thiscertification and return it to the following address:

U.S. Army Corps of Engineers, Philadelphia DistrictWanamaker Building - 100 Penn Square EastPhiladelphia, Pennsylvania 19107-3390Attention: CENAP-OP-R

Please note that the permitted activity is subject to a compliance inspection by an Army Corps ofEngineers representative. If you fail to return this notification form or fail to perform work incompliance with the permit, you are subject to administrative, civil and/or criminal penalties.Further, the subject permit may be suspended or revoked.

The authorized work was commenced on

The authorized work was completed on

I hereby certify that the work authorized by the above referenced permit has been completed inaccordance with the terms and conditions of the above noted permit.

Signature of Contractor

Address:

Telephone Number:

Signature of Permittee

Address:

Telephone Number:

For project located in areas identified as shellfish habitat, you must include with this form a billof lading; sales order or any other document(s) demonstrating non-polluting materials werepurchased and utilized for your project. I hereby certify that I and/or my contractor have utilizednon-polluting materials as defined in the above noted permit.

Signature of Contractor Signature of Permittee

Enclosure 7

CONDITIONS FORDEPARTMENT OF THlE ARMY PERMITS

GENERAL CONDITIONS

1. The time limit for completing the work authorized ends on December 31, 2020. If you findthat you need more time to complete the authorized activity, submit your request for a timeextension to this office for consideration at least one month before the above date is reached.

2. You must maintain the activity authorized by this permit in good condition and inconformance with the terms and conditions of this permit. You are not relieved of thisrequirement if you abandon the permitted activity, although you may make a good faith transferto a third party in compliance with General Condition 4 below. Should you wish to cease tomaintain the authorized activity or should you desire to abandon it without a good faith transfer,you must obtain a modification of this permit from this office, which may require restoration ofthe area.

3. If you discover any previously unknown historic or archeological remains whileaccomplishing the activity authorized by this permit, you must immediately notify this office ofwhat you have found. We will initiate the Federal and State coordination required to determineif the remains warrant a recovery effort or if the site is eligible for listing in the National Registerof Historic Places.

4. If you sell the property associated with this permit, you must obtain the signature of the newowner in the space provided on page 3 of this document and forward a copy of the permit to thisoffice to validate the transfer of this authorization.

5. If a conditioned water quality certification has been issued for your project, you must complywith the conditions specified in the certification as special conditions to this permit. For yourconvenience, a copy of the certification is attached if it contains such conditions.

6. You must allow representatives from this office to inspect the authorized activity at any timedeemed necessary to ensure that it is being or has been accomplished in accordance with theterms and conditions of your permit.

SPECIAL CONDITIONS

1. All work performed in association with the above noted project shall be conducted inaccordance with the project plans identified as E-1 through E-8; and entitled "MaintenanceDredging...", dated January 22, 2010, no revisions, prepared by S.T. Hudson Engineers, Inc.,sheet I of 1.

2. Construction activities shall not result in the disturbance or alteration of greater than 0.348acres (15,180 square feet) of waters of the United States.

-2-

3. Any deviation in construction methodology or project design from that shown on the abovenoted drawings must be approved by this office, in writing, prior to performance of the work.All modifications to the above noted project plans shall be approved, in writing, by this office.No work shall be performed prior to written approval of this office.

4. This office shall be notified at least 10 days prior to the commencement of authorized workby completing and signing the enclosed Notification! Certification of Work CommencementForm (Enclosure 6). This office shall also be notified within 10 days of the completion of theauthorized work by completing and signing the enclosed Notfication/Certification of WorkCompletion/Compliance Form (Enclosure 7). All notifications required by this condition shallbe in writing and shall be transmitted to this office by registered mail. Oral notifications are notacceptable. Similar notification is required each time maintenance work is to be done under theterms of this Corps of Engineers permit.

5. The permittee understands and agrees that, if future operations by the United States requirethe removal, relocation, or other alteration, of the structure or work herein authorized, or if, inthe opinion of the Secretary of the Army or his authorized representative, said structure or workshall cause unreasonable obstruction to the free navigation of the navigable waters, the permitteewill be required, upon due notice from the Corps of Engineers, to remove, relocate, or alter thestructural work or obstructions caused thereby, without expense to the United States. No claimshall be made against the United States on account of any such removal or alteration.

6. That all dredged material shall continue to be permanently disposed in the confined on-site,upland disposal area on Artificial Island, located on Block 26, Lots I and 2, directly adjacent tothe Salem and Hope Creek Nuclear Power Plant.

7. That the pennittee shall maintain adequate surveillance of the dredging disposal operations toassure that the banks used'to confine the dredged material are safe from failure and that thedisposal area is not used beyond capacity.

8. That the dredged material disposed on upland property shall be appropriately contained toprevent erosion and subsequent sedimentation of the aquatic habitat of any water of the UnitedStates adjacent to or in proximity to that disposal site. No sediment laden water is permitted toreturn to the Delaware River and/or any waters of the U.S.

9. That the Corps shall be notified before any subsequent maintenance dredging takes place, andshall be advised of the amounts of dredged material to be generated. This permit does notauthorize hydraulic dredging.

10. That mechanical maintenance dredging operations are authorized for ten years from the dateof this permit provided that the dredging location, depth (-5.0 MLW), and the approved disposalarea location remain unchanged.

-3-

11. The permittee shall comply with all terms and conditions of the district wide BiologicalOpinion issued in 1996, amended in 1998, if during dredging and disposal operations ShortnoseSturgeon are encountered.

FURTHER INFORMATION

1. Congressional Authorities. You have been authorized to undertake the activity describedabove pursuant to Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403).

2. Limits of the Authorization.

a. This permit does not obviate the need to obtain other Federal, State, or localauthorizations required by law.

b. This permit does not grant any property rights or exclusive privileges.

c. This permit does not authorize any injury to the property or rights of others.

d. This permit does not authorize interference with any existing or proposed Federalproject.

3. Limits of Federal Liability. In issuing this permit, the Federal Government does not assumeany liability for the following:

a. Damages to the permitted project or uses thereof as a result of other permitted orunpermitted activities or from natural causes,

b. Damages to the permitted project or uses thereof as a result of current or futureactivities undertaken by or on behalf of the United States in the public interest.

c. Damages to persons, property, or to other permitted or unpermitted activities orstructures caused by the activity authorized by this permit.

d. Design or construction deficiencies associated with the permitted work.

e. Damage claims associated with any future modification, suspension, or revocation ofthis permit.

4. Reliance on Applicant's Data. The determination of this office that issuance of this permitis not contrary to the public interest was made in reliance on the information you provided.

-4-

5. Reevaluation of Permit Decision, This office may reevaluate its decision on this permit atany time the circumstances warrant. Circumstances that could require a reevaluation include, butare not limited to, the following:

a. You fail to comply with the terms and conditions of this permit.

b. The information provided by you in support of your permit application proves to havebeen false, incomplete, or inaccurate (See Item 4 above).

c. Significant new information surfaces which this office did not consider in reaching theoriginal public interest decision. Such a reevaluation may result in a determination that it isappropriate to use the suspension, modification, and revocation procedures contained in 33 CER325.7 or enforcement procedures such as those contained in 33 CFR 326.4 and 326.5. Thereferenced enforcement procedures provide for the issuance of an administrative order requiringyou to comply with the terms and conditions of your permit and for the initiation of legal actionwhere appropriate. You will be required to pay for any corrective measures ordered by thisoffice, and if you fail to comply with such directive, this office may in certain situations (such asthose specified in 33 CFR 209.170) accomplish the corrective measures by contract or otherwiseand bill you for the cost.

6. Extensions. General Condition 1 establishes a time limit for the completion of the activityauthorized by this permit. Unless there are circumstances requiring either a prompt completionof the authorized activity or a reevaluation of the public interest decision, the Corps willnormally give favorable consideration to a request for an extension of this time limit.

7. Transference. When the structures or work authorized by this permit are still in existence atthe time the property is transferred, the terms and conditions of this perm-fit will continue to bebinding on the new owner(s) of the property. To validate the transfer of this permit and theassociated liabilities associated with compliance with its terms and conditions, have thetransferee sign and date below.

(Transferee) (Date)

Enclosure (2)

United State Army. Cpors ofEngineers'F ~17:21

9./

RenT v 2,6 0ui yard6 oi:.Z mae fo i-t~h in t hE

..A permit-to Hp re BreSiThe '~Iem .an d- Rop C-k -Nuc-l e'ar, Gne at~i aSa t 1a bns.

M~r..: Jbonata ýSears. FEB 14 2010Fhsbeen Issued to.PE ucer L on ___

Alddress oftPerm itte'e 0 Boxý 03. ac sBigN 83

FrankJ.Cafai-Permit.Number Ch~ief, Regulatory Branch

f~N7 ~ T~ j~P ~Diitrict -C'ommanderfor Thomas J.. Ticknier, 1Lt;.C oloel

Corps of Engineers,, D)st Commander l.

4M ENG FORM, 4338 -, Jut 81 -(S14-2,0-3*!ýEDITION 6 JUL 70 MAY BSE USED (Rroponen:-bAEN- C"W`0)

/

PSEG Nuctear LLC

N~ T.

SCH09-124

CERTIFIED MAILRETURN RECEIPT REQUESTEDARTICLE NUMBER: 7008 1830 0004 1876 0658

Ms. Barbara WareBureau of Water AllocationNJDEP - Division of Water Supply401 East State Street, PO Box 426Trenton, New Jersey 08625-0426

PSEG Nuclear - Salem and Hope Creek Generating StationsWater Allocation Permit Program !nterest ID. 2216PActivity No. WAP040001Permit Renewal Application

Dear Ms. WareAs advisad in your September 16, 2009 letter, attached is the r for renw-the subject WatSr Allocation Permit. Thank you for your assistance in this matter.

The atlached renewal application includes the fIollowing enclosures:1 . Cornpleted and Certified Application Form BWA-001 B:2. Addendum A - Source Data for Groundwater;3. Supplemental information;4. FHow meter Calibration;5. List of Safe Drinking Water / Environmental Permits;6. Water Conservation and Drought Emergency Plan; and,7. Inactive Well Certification.

PSEG Nuclear does not believe this constitutes a major modification, in that none of thefollowing conditions exist:

1. A change in water use requested;2. A 10% increase in consumptive use;3. A change in wastewater discharge location;4. Relocation of a diversion source;5. Addition of a diversion source;6. Increased diversion capacity;7. Increased allocation; nor,8. A change which could adversely affect the resource or other users.

Bureau of Water AllocationSCH09-124

I would be glad to meet with you at your convenience to discuss this application andprovide any further information required. Please contact Luis Cataldo of my staff at856-339-2307 or by e-mail atLuis.Cataldo(Dpseg.com . Thank you for your assistance.

Respýýly

Robert N. BernardChemistry, Radwaste & Environmental Manager

Bureau of Water AllocationSCH09-1.24

S C Carol CollierDelaware River Basin Commission25 State Police DriveP.O. Box 7360West Trenton, NJ 08628-0360

Diane E. Zaluskas, Section ChiefNJ Department of Environmental ProtectionBureau of Water AllocationPO Box 426Trenton, NJ 08625-0426

0

Bureau of Water AllocationSCH09-124

BC John Valeri, Esq. - General Environmental CounselH. L. GregoryE. J. KeatingM. L. McLaughlinC. E. WhiteT. M. SyedFile

ENCLOSURE 1

Completed and Certified Application Form BWA-OOIB

BWA-001 BRevised 8/04

MFSID(DEP Use Only)

NEW JERSEY DEPARTMENT OF ENVIRONMENTAL PROTECTION

WATER SUPPLY ADMINISTRATION

BUREAU OF WATER ALLOCATIONP.O. Box 426

TRENTON, NEW JERSEY 08625-0426(609) 292-2957

WATER ALLOCATION PERMIT APPLICATION

RENEWALS

PLEASE READ THE INSTRUCTIONS BEFORE COMPLETING THIS APPLICATION FORM.Provide all requested information, as applicable.

A.LOC-AIl0 :A' 1,PR , 1Y.IN1*0Rj.AT 0 N

The Department is now maintaining a single database of regulated sites. The following information will prevent unnecessaryduplication of data.

I .AC~TUA1L DiER~Sio's LOCA i ION1~

Name of Facility Application is for (For facilities pending or under construction, please use the proposed facility name)

PSEG Nuclear LLC - Salem and Hope Creek Generating Station

Street Address/Location (or nearest cross streets if no address is available; P.O. Boxes are not acceptable)

End of Alloway Creek Neck Road

City or Town Hancocks Bridge State NJ ZipCode 08038 + 0236

Municipality Lower Alloways Creek Does the Facility span multiple municipalities? Yes El No 0

County Salem Does th

2,. PIR OP E~RTY MANlD O4 WNER S(5) I N FORM A~T'O N

Name PSEG Nuclear LLC

e Facility span multiple counties? Yes [ No 0

Telephone (856) 33 9 -2307

Mailing Address P.O. Box 236 M/C S07

City or Town Hancocks Bridge

Organization Type: 0" Authority/District/Commission(Check one) 0 Commercial/Industry

El Investor (Non-BPU)

3. APPLICA NTuOPERATrN F NL(LCJ

Name PSEG Nuclear LLC

State NJ ZipCode 08038 + 0236

o Municipal 0l County 0l State0 Individually Owned 0l Utility 0l Corporation0l Investor (BPU) 0l Other

Telephone( 8 5 6 ) 339-2307

MailingAddress P.O. Box 236 M/C S07

City or Town Hancocks Bridge State NJ ZipCode 08038 +0236

CONTACT INFORMATION

Application Contact (contact at the above address for all application matters):

If an agent has been authorized under the certification section of the application to act as the agent/representative in al

matters pertaining to the application, please check here: El

* Quarterly Monitoring Report Forms will be sent to the Report Form Recipient at the address listed in this section.

Page ] of'12

If an agent has not been authorized, provide an Application Contact:

* Name Luis Cataldo Telephone (856) 339-2307

Report Form Recipient/Permit Contact (contact at the above address for permit information and monitoring reports):

Name Luis Cataldo Telephone (856) 339-2307

Title Supervisor Department Salem Environmental & Radioactive Waste

74. RESPOAkFNT ENirLT'/GAŽ1.ZATFION

If the responsible organization is the Applicant located in No. 3 above, check here: M

If the responsible organization is different from the Applicant in No. 3 above, complete the following:

Organization Name Telephone ( )

Mailing Address

City or Town State Zip Code +

Fax( ) E-Mail

Organization Type: El Authority/District/Commission El Municipal El County El State(Check one) 0l Commercial/Industry 0l Individually Owned El Utility El Corporation

11 Investor (Non-BPU) El Investor (BPU) El Other

B5 I LLIN~G CONTACT 4~j~ ~~~

Billing should go to mailing address of:

El Responsible Entity/Organization address in No. 4 29 Applicant/Operating Entities address in No. 3

Name Luis Cataldo Telephone( 8 5 6 ) 339-2307

6. OTHER hE~RNiiTs/A.GENCIES .

Provide the following for any other state, local or federal permit that has been applied for in relation to this project.

Permit Type Application No./ Permit Application Application StatusNo./Relevant DEP No. Date

" Water Quality Management Plan Amendment

" Safe Drinking Water System/Potable Water See Attached ListSupply Well or Intake0 Hazardous Waste Management Program

0 Land Use Permits (Freshwater Wetlands, etc.)

* Relevant Environmental Permits- Including See Attached ListFederal, State, & Local Approvals - Specify:

0 Is the project located within the New Jersey Pinelands Area? __ Yes x NoIf this application includes a new source of supply, which is located in the New Jersey Pinelands Area, or is for anincrease in allocation, then a Certificate of Filing from the New Jersey Pinelands Commission must be submitted withthe application. The Pinelands Commission can be contacted at (609) 894-7300.

Page 2 of 12

Is the project located in the Delaware River Basin? X Yes NoIf Yes, has a docket been issued for this project by the Delaware River Basin Commission?

x Yes DocketNo. Salem: D-90-71/ HC: D-73-193

No Docket applied for on (Date)The Delaware River Basin Commission can be contacted at (609) 883-9500.

In cases where the official required to sign Certification 1 below is the same person as the official required to sign theCertification 2 below, only Certification I need be signed. In all other cases, both certifications shall be completed.

1. HIGHE ST RANKING IAND IYVJDUAL O'FFACIYLITY

This certification is to be signed by the highest-ranking individual at the facility with overall responsibility for that facility.

I certify under penalty of law that the information provided in this document is true, accurate and complete. Iam aware that there are significant civil and criminal penalties for submittingfalse, inaccurate or incompleteinformation, including fines and/or imprisonment.

Date Signature

Thomas P. Joyce

Name (please print)

President & CNO, PSEG Nuclear LLC

Title

2. -IffGHEST RAN IN. :NDI VID A L"

This certification shall be signed as follows:

(a) For a corporation, by a principal executive officer of at least the level of vice president; or(b) For a partnership or sole proprietorship; by a general partner or the proprietor, respectively; or(c) For a municipality, State, Federal or other public agency, by either the principal executive officer ranking elected

official.

I certify under penalty of law that I have personally examined and am familiar with the information submitted inthis application and all attached documents, and that based on my inquiry of those individuals immediatelyresponsible for obtaining the information. I believe that the submitted injbrmation is true, accurate andcomplete. I am aware that there are significant civil and.criminal penalties for submitting false, inaccurate orincomplete information, including the possibility offines and/or imprisonment.

Date Signature

Name (please print)

Title

S

Page 3of12

I, the Applicant/Oiwner or Applicant/Operator (when the owner of the

facility and the operator J'the Jbcilitv are distinct parties)

or Co-permittee (if applicable) authorize to act as nml

agent/representative in all matters pertaining to my application the tbllowing person:

Name .Phone.

Company/Employer

Address County,

City or Town State Zip Code

Occupation/Profession

(Signature of Applicant/Owner)

(Signature of Applicant/Owner)

AGENT'S CERTIFICATION

Sworn before me

this day of

20

Notary Public

(Signature of Co-permittee)

I agree to serve as agent for the above mentioned applicant

(Signature of Agent) '

4 STATEMENT ,OF PREPARELROF PLANS, SPEC IFICAINS, SURVE__ OS_ R TECHNIL RE T (If A P PLICABLE)

I hereby certifi,, that the engineeringplans, specifications and engineers report applicable to this project compljywith the current rules and regulations of the State Department of Environmental Protection with the exceptions

as noted.

(Signature of Engineer)

Type: Name and Date

Position, Name of Firm0 PROFESSIONAL ENGINEER'SEMBOSSED SEAL

Page 4 of 12

Check to ensure the following are included with the application:Included 4

1. Proof of Meter Calibration for each source

2. F Water conservation and Drought Management Plan0f not required, please indicate why:

3. Information supporting Future Demands Projections listed in Section E. 1.

3Will

This application is for:

El Renewal of existing Permit No. 2216 P Activity No. (if known) WAP 0 4 0 0 01

1. Present Allocation:a. Groundwater: 4 3 . 2 million gallons of water per month at a maximum rate of 2 9 0 0 gallons per minute.

If Groundwater sources are in two or more Aquifers, please note the present Aquifer Specific Allocation:Present Allocation

Aquifer/Formation Name (million gallons)Per Month (mgm) Per Year (mgy)

Mt. Laurel/Wenonah 20.9 250

Upper Raritan 30.2 300

Middle Raritan 17.3 208

b.

C.

d.

Surface water: 0 million gallons of water per month at a maximum rate of 0 gallons per minute.

All sources: 43w.a2 million gallons of water per month at a maximum rate of 290_ 0 gallons per minute.

All sources: 300 million gallons of water per year.Note: Monthly allocations are established based upon the maximum withdrawal expected during any one month(31 days) of the calendar year.

p

2. Diversiontobeusedfor Industrial, coolinq, and potable purposes

3. Complete the following for each diversion source:a. Groundwater (wells)

Proposed MaximumState Well Permit No. Existing (E) Withdrawal Rate

(mandatory) Well Local Name Location Description Proposed (P) (million gallons)Per Month Per Year

N 39:27:52.892834-00757 PW-2 E 9.76 117

W 75:32:07.5836

34-00758 PW-3 N 39:27:54.3761 E 11.1 133W 75:31:58.7800

34-01031 PW-5 E 30.2 300

W 75:31:50.8802N 39:27:50.4607

34-01512 PW-6 I IW 75:32:11.0458 E 17.3 208

If source specific surface water allocations are requested, please attach requests as necessay,.Page 5 of 12

b. Groundwater (continued from previous pa2e)Proposed Maximum

State Well Permit No. Existing (E) Withdrawal Rate(mandatory) Well Local Name Location Description Proposed (P) (million gallons)

Per Month Per Year

34-01073 HC-1 N 39:28:06.5634 E 30.2 300W 75:32:26.1139

34-01074 HC-2 N 39:28:08.0341 E 30.2 300W 75:32:08.3623

b. Surface water (streams, reservoirs, ponds)

Proposed Maximum

Intake Subject Item Intake Local Existing (E) Withdrawal RateIdentification No. 2 Name Location Description Proposed (P) (million gallons)

Per Month Per Year

N/A

+ 4 4 4 .4.

4 4 4 .4- 1

* h h I &

4. Complete Addendum A and B for each diversion source.

1. The current and projected average and peak water demands in million of gallons for 5 year intervals are as follows:

AVERAGE DEMAND PEAK DEMANDWATER DEMAND

Daily Monthly Annual Daily Monthly

Current Demand 0.54 16.2 195 1.17 35.1

5 Year Projections 0.55 16.7 200 1.30 39.0

10 Year Projections 0. 55 16.7 200 1.30 39.0

15 Year Projections 0.55 16.7 200 1.30 39.00'State Well Permit No. is mandatory for existing wells (see instructions).2 Intake Subject Item identification No. is the identification number assigned to the intake bh1 the DEP. For existing, approved

sources, this number can be/6bund on the Pre-Printed Monitoring Report Forms or the existing permit.Page 6 qf]12

2. Present annual average water use:Self Supplied Other Estimated

WATER USE Ground Surface Sources Total Consumptive Use.'(mgd) (mgd) (mgd) (mgd) (%)

Domestic Supply 0.019 0.019 20

Industrial Process 0.43 0.43 20

Industrial Cooling

Irrigation

Commercial

Remediation

Other 0.088 0.088

Total Water Use 0.537

Consumptive use is water withdrawn that is not returned to the surface or ground waters at or near the point fromwhich it was taken without substantial dimunition' in quantity or substantial impairment of quality.

3. The water, after use for above purposes stated in D.2., will discharge into Delaware River(Name of Stream, Sewage System, or Subsurface Disposal System). For wastewater discharged directly by thefacility or via a sewerage system to treatment plant, provide the location of the plant and its NJPDES Permit Number.Location:Salem and Hope Creek Generating Station

NJPDES Permit No. Salem: NJ0005622 / Hope Creek: NJ0025411 44. For non-potable diversions, what is the source of water for sanitary use? Permitted Groundwater Wells

Complete if water is to be used for irrigation purposes.

1.' Check to ensure the following is included:

IncludedAttach a diagram of the irrigation system piping between the diversion sources, any storage ponds and

wet wells, up to the irrigation system distribution piping. Include the position of all water meters.

2. irrigation is to be used for (e.g. golf course, landscape, grounds maintenance)

3. Describe the types of grasses, acreage and maximum need for each in extreme dry weather, in gallons per week.

4. Describe the irrigation system (type, capacity of nozzles in gpm, maximum number of nozzles operating at one time,

average and maximum irrigation time in hours per day, how diversion is metered, how the ponds are fed.)

Page 7 of 12

5. Is there any treated wastewater used for irrigation? Yes No

G BIL I C'W I,- V SY S T M S J.,

I Fomplete only if diversion is for public water supply.

1. Population

a. Population supplied at the time of application:

b. Provide source or basis as to how figure in la. was determined:

c. The population supplied is projected to be by the year

population is (or include in attached report):

"____ The method used to calculate the

2. Estimated Consumption (average day of maximum month (MGD)):

a. Immediate

b. Future ( - years)

3. Quantity or percentage of water supplied during the last calendar year for the following:

Annual Maximum MonthTotal

Domestic

Commercial

Industrial

Other

4. Quantity or percentage of unaccounted-for water (as defined by N.J.A.C. 7:19-6.2):

of a total water production of million gallons.

5. Number of Service Taps: Domestic Commercial and Industrial

Number of Meters: Domestic Commercial and Industrial

6. Capacity of Plant (gallons daily)

7. Total System Storage (million gallons)

8. The following is required for all Public Water Supply Applications:

for (Year),

Included

El

El

a. 1 Provide a list of all contracts with other municipalities or water companies to supply or purchasewater. Provide copies of the all contracts not previously approved by the Bureau.

b. List of municipalities to be supplied. Submit a map of the service area when not restricted by

established municipal limits. (If not submitted previously.)

E c. List of all interconnections, size of each interconnection, and the water system serviced.

l d. Other drawings and information deemed pertinent.

Page 8 of 12

ADDENDUM A

SOURCE DATA FOR GROUNDWATER (WELLS)Complete Well information for all existing and proposed sources. This information is mandatory. Refer to instructionsOfor acceptable values. Please reference the same State Well Permit Numbers and Well Names as referenced in Sectionof the application. Attach additional copies of addendum as needed. See Attached Table

State Well Permit No.

Well Local Name

Date Drilled

Total Finished Depth (feet)(include tailpiece if any)

Depth to Top of Open HoleInterval or Screen (feet)

State Well Permit No.

Well Local Name

Date Drilled

Total Finished Depth (feet)(include tailpiece if any)

Depth to Top of Open HoleInterval or Screen (feet)

Depth to Bottom of OpenHole Interval or Screen(feet)Rated Pump Capacity(gpm)

Yield(gpm)

Aquifer/GeologicalFormation

Depth to Bottom of OpenHole Interval or Screenffeeei iRated Pump Capacity(gpm)

Yield(gpm)

Aquifer/GeologicalFormation

Elevation Information:Site Elevation

Elevation SystemDescription

Elevation MethodDescription

Absolute ElevationAccuracy

Absolute ElevationAccuracy Units (feet ormeters)

Locational Information:X coordinate (e.g.Longitude) of well center

Y coordinate (e.g. Latitude)of well center

Coordinate System Codeand Description

Coordinate MethodDescription

Absolute LocationAccuracy

Accuracy Units (feet ormeters)

Elevation Information: !aSite Elevation w

Elevation SystemDescription

Elevation MethodDescription

Absolute ElevationAccuracy

Absolute ElevationAccuracy Units (feet ormeters)

Locational Information:X coordinate (e.g.Longitude) of well center

Y coordinate (e.g. Latitude)of well center

Coordinate System Codeand Description

Coordinate MethodDescription

Absolute LocationAccuracy

Accuracy Units (feet ormeters)

Addendunm A Page _ of.Page 9 ofq12

ADDENDUM BSOURCE DATA FOR SURFACE WATER (STREAMS, RESERVOIRS, PONDS)

Womplete intake information for all existing and proposed sources. This information is mandatory. Refer to instructionsfor acceptable values. Please reference the same Source Intake ID and Intake Local Name as referenced in Section D ofthe application. Attach additional copies of addendum as needed: N/A

Source Intake SI ID(if already permitted)

Intake Local Name

Rated Pump Capacity(gpm)

MA7CD10 (cfs) at intakeopening

Requested Passing Flow(cfs)

Surface Water QualityClassification

Drainage Area AboveIntake (square miles)

Source Intake SI ID(if already permitted)

Intake Local Name

Rated Pump Capacity(gpm)

MA7CD10 (cfs) at intakeopening

Requested Passing Flow(cfs)

Surface Water QualityClassification

Drainage Area AboveIntake (square miles)

Locational Information:

X coordinate (e.g.Longitude) of intakeopeningY coordinate (e.g.Latitude) of intakeopeningCoordinate System Codeand Description

Coordinate MethodDescription

Absolute LocationAccuracy

Accuracy Units (feet ormeters)

Locational Information:

X coordinate (e.g.Longitude) of intakeopeningY coordinate (e.g.Latitude) of intakeopeningCoordinate System Codeand Description

Coordinate MethodDescription

Absolute LocationAccuracy

Accuracy Units (feet ormeters)

0Addendum B Page _ of_

Page 10 of]12

G L A1 TRUCT1

This form includes eight sections, A through H. and Addenda A and B. Section G applies to irrigation water users (other tha@Agricultural/Horticultural water users certified by the County Agricultural Agent under N.J.A.C. 7:20A-1 et seq.). Section Happlies to Public Water Suppliers. Addenda A and B apply to each individual diversion source for all applicants. Allapplicable sections must be completed or the application will be returned.

Applications must reference valid State Well Permit Numbers and wells must be permitted for their intended use. A well searchcan be scheduled by the applicant or performed by the Department for a fee. Applications without valid State Well PermitNumbers for existing wells will be returned.

All information required by the regulations under N.J.A.C. 7:19-2.2 must be addressed in this application.

A. Site Location Information

1. Actual Diversion Location - Provide the Name of the Facility of which the application is for, the physical streetaddress or nearest cross streets of the diversion location. Attach additional sheets if more than one physical locationapplies.

2. Property/Land Owners - Provide the legal name for the owner of the property/land on which the diversion is located.

3. Applicant/Operating Entity(ies) - Provide the name, as it is 'legally referred to, of the operating entity of the subjectfacility. The operating entity is the firm, public agency, individual, or other entity which has the primary managementand decision making authority over any part of the facility/site.The Application Contact is the individual responsible for all aspects/inquiries regarding the application. Check theAgent box if an Agent has been designated in Section B3 of the Application. The Report Form Recipient/PermitContact is the designated individual responsible for completing Quarterly Monitoring Report Forms. All MonitoringReport Forms will be mailed to the Report Form Recipient/Permit Contact designated at the Operating Entitiesaddress.

4. Responsible Entity/Organization - The person, company, or corporation financially responsible for the activityrelating to the diversion and has overall legal responsibility of the activities occurring at the site. The organizatliable or accountable for overall facility operations. The responsible entity may be the same asApplicant/Operating Entity noted in Section A3. If so, check the appropriate box provided. If not, provide therequested information for the Responsible Entity

5. Billing Contact - Check the box of the appropriate address (either the Responsible Entity/Organization' or theApplicant/Operating Entity) and indicate the individual contact for all billing inquiries.

6. Other Permits - Provide information for all other permits applied to in relation to the project and diversion activities,as indicated.

B. Certifications - Provide Certifications as indicated in Section B.

C. Required Submittals/Application Attachments

1. All diversion sources must be metered prior to treatment. Submit evidence to demonstrate that the flow meter for eachsource has been calibrated within the past five years.' Also include the type of meter for each source. Evidence ofmeter calibration is not required for new sources (meters must be installed on all approved new sources, however). Ifthe diversion is not metered at each source prior to treatment, please indicate why.

2. A completed Water Conservation and Drought Management Plan. Separate instructions and worksheets forcompleting' the plan should be obtained by contacting the Bureau of Water Allocation. A Conservation Plan is notrequired if the application is for ground water remediation, sand and gravel mining; or where diverted water is returnedin undiminished quantity to its source.

3. Supporting information that shows how the future demands were determined in Section E.I. of the application.

For Sections D through G, please provide all information as requested in the section.

Page 1] of 12

ý2. i.I §.N.STRUJC T I0NS FOR C.MPTL'ING A DADIE-ND A .A::AND :B

*he following tables provide the acceptable values for completing Addenda A and B.

Elevation Information

jpEle N0a tioni System Description iFeet above sea level

'Meters above sea level i

7Eevation Metho~d Description,Approximate address match- --1. ........r 0 m. _ . ta1 .b1- .. -... ........ ... ..........................iDEP program database!..D .{g ~ a .{ .im a g ..................................... ...... .............. .. ........'Digital imageExact address match

iGPS

i£ o p g g g p ~ c oM ap ..... ....................... ................................ ..... .. ...Hard copy matchlicensed SurveyorTopographicMap'Plot Plani Proposed Elevation-Digital ImagejProposed Elevation-Hard Copy Map

Absolute elevation accuracy is the uncertainty in feet or meters of the elevation measurement.

Locational Information

USGS quadrangle maps have the cooIrdinate system printed on the map. GPS units can usually be set to display a variety ofcoordinate systems. New Jersey State Plane 83 - USFEET is the State standard.

*Cooirdijiate Method Desciptimi

2721200902012608

Lai/ Lung JI,- .i Z I) -- )ueCcmai iegreesjLat/Long (NAD27) - DMS

.~~~~ ~.. . ... .. ........ .... .. . . . . . . . . . ........... .................. -- - --,Lat/Long (NAD83) - Decimal Degrees}Lat/Lon(NAD83) - DMS

,New Jersey State Plane 27 - USFEETNew Je e S e Pane 83 Mete ...............New Jersey State Plane 83 - USFEET

!UTM (NAD27) - Meters:UTM Zone 18N - MetersiUTM Zone 18N (78 W to 72 W) - Kilometers

GPS.DEP Program Database,Exact Address MatchiDigital Image (such as i-Map)

Hard Copy MapOther (Describe)-th e • (D e s c r jb e ) 11111 - .-.ý.... ..................... .. ................................. .................... ... .. .................

Approximate Address Matchproposed Location - Digital Image (such as i-Map)Proposed Location - Hard Copy Map

03

*Coordinates obtained historically from BWA are likely to be Lat/Long (NAD27) - DMS

Absolute location accuracy is the uncertainty in feet or meters of the location from actual ground truth. Modern GPS units canprovide this number.

Page 12 of'12

-ENCLOSURE 2

Addendum A - Source Data for Groundwater

Addem A PaO of 2

PSEG NUCLEAR LLCGROUNDWATER SOURCES (WELLS)

PERMIT No. 2216P

Well Well No. Location Site Elevation Depth Pump Capacity Pump Yield Aquifer/Formation NamePermit No. (Local Name) (ft above MSL) (feet) (gpm) (gpm)

N 39:27:52.892834-00757 PW-2 W 75:32:07.5836 17.2 281 300 226 Mt. Laurel/Wenonah

N 39:27:543.376134-00758 PW-3 W 75:31:58.7800 17.11 293 600 257 Mt. Laurel/Wenonah

N 39:27:55.155034-01031 PW-5 W 75:31:50.8802 21.49 840 800 700 Upper Raritan

N 39:27:50.460734-01512 PW-6 W 75:32:11.0458 12.85 1135 600 400 Middle Raritan

N 39:28:06.563434-01073 HC-1 W 75:32:26.1139 18.63 816 750 700 Upper Raritan

N 39:28:08.034134-01074 lHC-2 W 75:32:08.3623 18.23 816 750 700 Upper Rari!tan

Addendum A Page 2 of 2

PSEG NUCLEAR LLCGROUNDWATER SOURCES (WELLS)

PERMIT No. 2216P

Proposed Maximum Withdrawl Rate

Source Name Per Month Per Year Per Minute(million gallons) (million gallons) (gallons)

34-00757PW-2 (Mt. Laurel/Wenonah) 9.76 117 226

34-00758PW-3 (Mt. Laurel/Wenonah) 11.1 133 257

34-01031PW-5 (Upper Raritan) 30.2 363 700

34-01512PW-6 (Middle Raritan) 17.3 208 400

34-01073HC-1 (Upper Raritan) 30.2 363 700

34-01074HC-2 (Upper Raritan) 30.2 363 700

0

ENCLOSURE 3

Supplemental Information

PSEG ARTIFICIAL, ISLAND

DIVERSION PERMIT 2216P RENEWAL

SUPPLEMENTAL INFORMATION

1. Salem and Hope Creek Generating Stations are located on the East bank of the DelawareRiver in Lower Alloways Creek Township, Salem County, New Jersey. The site is owned,including mineral rights, by PSEG Nuclear LLC. The Salem Generating Station consists oftwo pressurized water nuclear reactors with an electrical capacity of approximately 1200megawatts each. The Hope Creek Generating Station consists of one boiling water reactorwith an electrical capacity of approximately 1260 megawatts.

2. This permit renewal request is a renewal of an original allocation granted by the WaterPolicy and Supply Council under Permit Nos. P-721, P-743, P-969, P-998, and P-1178.Permit No. 2059P for Hope Creek was deleted on July 12, 1990, and 2216P was issued as aconsolidation of Hope Creek and Salem Water Allocation Permits.

3. Permit 2216P currently allocates an amount not to exceed 43.2 million gallons during anymonth, at a maximum rate of 2900 gallons permit minute. The total diversion from allsources is allocated at 300 million gallons per year.

4. It is requested that PSEGs monthly allocation be renewed at the current rate of 43.2 milliongallons per month

5. Diversion is for the purpose of supplying industrial process water, intermittent industrialcooling, and potable purposes as specified in the permit application. Estimated groundwaterdiversion requirements for the Salem and Hope Creek Generating Stations are summarizedas follows:

a. Routine operations including recovery of steam generator blowdown forrecovery in the condensers for three units operating: 402 gpm (17.3 mgm)

b. Non-recovery of steam generator blowdown water at the Salem GeneratingStation during start up, shutdown or chemistry transients or due to changes inplant operations protocol: 502 gpm (21.7 mgm)

Total 732 gpm (39.0 mgm)

6. A nuclear power electrical generating plant utilizes ultrapure water for the plant processes.Ultrapure water is well water purified by either demineralization or reverse osmosis. Theseprocesses remove most impurities from the well water to achieve, theoretically, absolutelypure water.

7. There are six existing production wells in operation serving Salem and Hope CreekGenerating Stations. Well No. 1 was sealed on November 4, 1998 (well abandonment reportand NJDEP submittal is enclosed for reference). Well Nos. PW-2 and PW-3 areapproximately 300 feet deep in the Mt. Laurel/Wenonah formation. Well Nos. PW-5, HC-1, and HC-2 are approximately 820 feet deep in the Upper Raritan formation. Well No.6 isscreened from 1,115 to 1,135 feet in the Middle Raritan formation.

8. There are four existing monitoring wells. Observation Well G is located in the Mt.Laurel/Wenonah formation. Observation Wells I and J and located in the Upper Raritanformation. Observation Well 6 is located in the Middle Raritan formation.

9. The monthly diversion from each well is recorded and submitted to the NJDEP on thequarterly report form (DWR-017A), or electronically through the NJDEP website. Thereview of monthly diversion by well for the period of the current permit shows no

Page 1 of 3

increasing trend in water use. The monthly diversion is reported to the NJDEP quarterly.Water use on these quarterly reports is summarized below:

Year Annual Use Maximum Average Existing

(mg) Monthly Use Monthly Use Allocation

(mg) (mg) (mgm)

2000 182.5 23.4 15.2 43.2

2001 169.9 20.3 14.2 43.2

2002 160.9 17.5 13.4 43.2

2003 161.9 18.6 14.5 43.2

2004 173.5 26.2 18.0 43.2

2005 215.7 28.8 18.2 43.2

2006 219 37.9 23.3 43.2

2007 190.4 25.1 16.3 43.2

2008 209.1 22.5 18.7 43.2

10. Chloride analyses are performed on all production and monitoring wells, except forObservation Well 6 and Production Well 3. Observation Well 6 is adjacent to ProductionWell 6 and at the same depth, therefore periodic analysis for chlorides is not required.Production Well 3 is a standby well and chloride analyses are not required since the primarypurpose of operating Production Well 3 only to collect chloride analysis samples. PSEGrecommends chloride analysis for Production Wells 2 not be included in the renewed permitfor the same reason.

11. All wells are constructed so that static water level (depth to water) can be determined at anytime. Static water levels and total head measurements are recorded monthly and reported tothe NJDEP quarterly.

12. Each well is equipped with a tag identifying the respective well permit number. Alldiversion sources are metered with an interchangeable totalizing flow meter, which iscalibrated every five years. Calibration Certifications are attached for Production Wells 2,6, HC 1, and HC 2. Production Well 3 pump was removed in 2005 and has not beenreplaced, therefore there is no pumping capability at this time for Production Well 3 and noflow meter is in use. The totalizing flow meter for well PW-5 was replaced with a factorycalibrated flow meter and we are requesting a copy of the calibration certification from thevendor, upon receipt the calibration certification will be transmitted under separate cover.PSEG requests the requirement for flow meter calibration for Production Wells 2 and 3 notbe required in the renewed permit. These production wells are for standby use only, and topump significant quantities of water from these wells for the purpose of calibrating the flowmeter is no appropriate. In the alternative, PSEG requests calibration of these flow metersbe changed to every 10 years..

13. The water discharges into the Delaware River. Sanitary wastewater, industrial cooling, andindustrial process wastewater are discharged under NJPDES Permits Nos. NJ0005622 and

NJ002541 1. These treatment works have adequate capacity and are not under enforcementaction or other restrictions by the NJDEP.

14. There are no known sanitary landfills or other sources of groundwater pollution affecting

these aquifers within a 5-mile radius.

15. The Water Conservation Plan and Drought Emergency Plan enclosed was prepared andsubmitted in January 2008 in accordance with the biennial requirements in the currentpermit. The 2010 biennial update will be submitted under separate cover in January 2010.

ENCLOSURE 4

Flow meter Calibration

SPARLING 4097 North Temple City BoulevardEl Monte, California 91731

~L~dL}Qit -ý wLJEZ Fr-'3ocgL4V5-

METER RECORD

Ship to METER

Address SERIAL

Meter Type ( '/', Meter Size NUMBER

Meter Spec. f/I I& ) C//- C) Type of Init. or Control Sales Order No. " /

Tech Dial Inst. or Control Ser. No Size Test Pipe •4C)• /-1--

Test Registration -, Cust. Re•. /' A-- -' Test Registration _ Cust. Reg.

Cust. Pipe Size 6 !C)6S "]. E ,.,71' . Cust. Pipe Size

Type of Prop (18d. O"tone O-Polythene 0 Durez Type of Prop 3 Bid. 0 Cone C Polythene 0 Durez

6 Bid. 0 Durez C3 Polythene 6 Bid. 03 Durez 0 Polythene

SPECIAL SPECIAL

Propeller No.... Propeller No.

Test Index No. I _ _ _ _ Test Index No. 2 Test Index No. I Test Index No. 2

GEARS TANK METER Accuracy TIME G.P.M. GEARS TANK METER Accuracy TIME G.P.M.

tc t . ,"°±c... " •- etH ____ ____i.

Slow down Meter % Speed up Meter + Slow down Meter % Speed up Meter_ %

Final Meter Ince-x-- Rag, Index I 1 Final Meter Index Reg. Index

*Calibrated Meter Index Gears *Calibrated Meter Index-- Gears-

Remarks Remarks

Tested by________ Certified Ov Tested by __________Certified By

D ate 1! 2 t 9C Date Date _ _______Date

-3- -4-Test Registration Cust. Rag. .Test Registration Cust. Rag.

Cust. Pipe Size Cust. Pipe Size

Type of Prop 3 Bid. 0 Cone 0 Polythene 0 Durez Type of Prop 3 Bid. 0 Cone 0 Polythene 0 Ourez

6 Bid. [] Durez C1 Polythene 6 Bid. 0 Durez 0 Polythene

SPECIAL __SPECIAL

Propeller No. Propeller No.____

Test Index No. I Test Index No. 2 Test Index No. I Test Index No. 2 __

GEARS TANK METER Acurecy TIME G.P.M. GEARS TANK METER Accuracy TIME G.P.M.

Slow down Motor ________% Speed up Metor______ % Slow down Meter ________% Speed up Meter________

Final Meter .nde Rag. Index Final Motor Index Reg. Index

*Calibrated Meter Index ___________Gears__________ *Calibrated Meter index __________ Gears__________

Remarks ____________________________Remarks ___________________________

Tested by ____________Certified By__________ Tested by ____________Certified By

Date _______________Date _______________Date _______________Date ______________

I

I'

SPARLING 4097 North Temple City BoulevardEl Monte, California 91731

METER RECORD

*tkl::7 WN Fr

-J

lkhip toAddress

Meter Type fM r io •

MatrSpec. a

Tech Dial

METER

I .. .A111bb~f-1,11 , )i I I I ........

Meter Size K['If I NUMBER

Type of Init. or Control Sales Order No. 7999kInst. or Control Ser. No_ Size Test Pipe 0" "6 5/ 'ý/

Test Registration -1-ýCut 09 'r

Cult. Pipe Size r". pi a (EI.7tType of Prop 8 BId. G.-C-,one 2"Polythene C Durez

6 Bid. 0 Duraz C3 Polythene

SPECIAL

-2-Test Registration Cust. Reg.

Cult. Pipe Size

Type of Prop 3 Bid. 13 Cone C Polythene [D Durez

6 Bid.

SPECIAL

C Durez 0 Polythene

Propeller No.

Test Index No. 1 Test Index No. 2

Propeller PU~

Tait In~m~ r.Jn I -- Tilt Indl• Nn •

GEARS ITANK METER Acuracy TIME G.P.M.

U/0.7i)f /C)9& ct ,? ___ ,C._)

,t C 1? - '2

GEARS TANK METER Accuracy TIME G.P.M.

q[L|

__________ I __________ I.....~..[ __________ I. __________ I ___

ISlow f 1ii Meter ,G Speed up Meter /3inl Moter Index -.5 . Reg. Index / ,2.•3

"Calibrated Meter Index. Gears -.

Remarks

Toted by - --- (- Certified By

.Date __________ Date 9!- 2%po- 4?

Slow down Meter % Speed up Meter_ %

Final Meter Index Reg. Index _

"Calibrated Meter Index Gears_

Remarks

Tested by Certified By

Date Date4

-31- .4 -Test Registration Cust. Reg.

Cust. Pipe Size

Type of Prop 3 Bid. C3 Cone 0 Polythene 0 Durez

Test Registration Cust. Rog.

Cust. Pipe Size

Type of Prop 3 Bid. E- Cone 0' Polythene 0 Durez

6 Bid. 0 Durez C Polythene

SPECIAL

6 Bid.

SPECIAL

0 Durez C Polythene

Propeller No.

Test Index No. I Test Index No. 2

Propeller No.T.*i Ii-E~,IiitS I

GEARS TANK METER IAcureey TIME G.P.M " GEARS TANK METER . our.cy TIME G.P.M.

I,

CA

zT

Z

I low down Meter % Speed up Meter_ __Final Meter Ida- R Reg. Index

*Calibrated Meter Index -Gears

Remarks

Tonted by ,_Certified By

Date __Date

Slow down Meter % Speed up Meter %

Final Meter Inde'- Reg. Index _

'Calibrated Meter Index Gears-

Remarks

Tested by Certified By

Dates ,,._•_Date

01/18/200& 13:34 IFAX [email protected]

, •~T iNC. Warn M•m, & (:•1o

CUSTOMER 0716646METER NUMBER

CFFEATURES

DATE6IHORI ZON 17 01I- ZON

MODEL & SIZE

~CHANGE GEARSCHANGE GER REGISTERS INTERIORSTRAIN REGISTER

MAIN LINE D34162 M-100 6' HCRIZON

BY-PASS

BY-PASS

RATE OF FLOW PERCENT RATE OF FLOW PERCENTGAL/MIN REGISTERED GAL/MIN REGISTERED

" 0 Ioo0.o(

15 101.00

9 100.80

IN THE STATE OF NORTH CAROLINA

TOWN OF CLEVELAND

I HEREBY CERTIFY THE TEST GIVEN ABOVE IS A TRUE COPY OF ORIGINAL SHOP TEST.

BY

0

REVISED 9/9/03

01/29/2008 15:33 FAX 70427898163,,'c./A .ot.._. D....... ... _ s

4Y4o, rov sm B•

.ERSEYMETERS,1 1Q_001/oo1

=FIFD FACMRY ACCUMY TW

CUSTOMER0411413

METER NUMBERSG

FEATURES

1/29/08DATE

SHORIZON 'HORIZONMODEL-&.SIZE

CHANGE GEARSTRAIN REGISTER REGISTERS INTERIORS

M AIN LINE D341_1 __RT %QN

BY-PASS

BY-PASS

- -RATE OFFLOW' PERCENT RATE"OFFLOW PERCENTGALIMIN REGISTERED GAIJMIN REGISTERED

2000 99.40

15 101.10

9 102.5(

IN THE STATE OF NORTH CAROLINA

TOWN OF CLEVELAND

I HEREBY CERTIFY THE TEST GIVEN ABOVE IS A TRUE COPY OF ORIGINAL SHOP TEST.

B Y __ _

0

OMP 8010

ENCLOSURE 5

List of Safe Drinking Water / Environmental Permits

0

Section A Part 6PSEG NUCLEAR LLC

PERMIT LIST (Hope Creek Generating Station)PERMIT No. 2216P

Agency Permit Type Permit Number Issue Status Expiration DateDate

U.S. Department ofCommerce, NationalOceanic and Atmospheric Incidental Take Statement - seaAdministration, and turtles and shortnose sturgeonNational Majine FisheriesServiceU. S. Nuclear RegulatorsU. License to operate NPF-57 4/1 1'1986 Approved 4/112026Commission _____________

U. S. Amy Corps of Nationwide Permit CENAP-OP-R-2006-6232-45 7,14/2008 Approved 7/14,2010EngineersDelaware River Basin -07Delwaesive Groundwater Allocation Permit D-90-71 I 1 '15,'2000 Approved 11/15/2010Commission

Delaware River Basin DRBC Docket No. D-73-193 CPComsinSurface Water Permit 4:'27/1984 Apprbved NiAICommission (Rev)

Delaware River Basin Water Use Contract 84-9-E-741 12.i12/1984 Approved N/AConunission

Administratively

New Jersey Department of Hope Creek New Jersey continued whileProtection Pollutant Discharge Elimination NJ0025411 12/31'2003 renewal 2,129/2008

Environmental System Permit Surface Water application isreviewed

New Jersey Department of Water Allocation Permit for Activity No. WAP04000 IEnvironmental Protection Salem and HCGS PrograA Interest ID: 2216P

New, Jersey Department of Air Pollution Control Operating

Environmental Proiectioi Permit (Title V Operating BOP080003 22/2005 Approved 211/2010Permit)

New Jersey Department of Grant of Permanent Right-of- NiA 11141/1971 Approved N/AEnvironmental Protection Way

Discharge Prevention,

New Jersey Department of Containment, andEnvironmental Protection Cotmtemieasure (DPCC) Plan 107040041000 3/4/2009 Approved 7/27/2011

and Discharge Cleanup and

Removal (DCR) Plan

New Jersey Department of Public Water Supply 1704300 9/14/1980 Approved NiAEnvironmental Protection Identification Number

New Jersey Department of CAFRA Permit 1704-02-0001.4 12/1/2005 Approved 111,2010Environmental Protection CAF 050003

New Jersey Department of Freshwater Wetlands (FAWW) 1704-02-0001.4 1212005 Approved 121l2010Environmental Protection Permit FWW 050002

New Jersey Department of CAFRA Permit 1704-02-0001.4 1 816/2005 Approved 8/16/2010Environmental Protection CAF 050002

New Jersey Department of FWW Permit 1704-02-0001.4 8/16/2005 Approved 8/ 162010Environmental Protection PrmtFWv 050001

New Jersey Department of FWW Permit 1704-02-0001.4Environmental Protection FWW 050002

New Jersey Department of Waterfront Development Permit 1704-02-0001.4 8,16/2005 Approved 8,16,2010Environmental Protection WFD 050001

Nes Jetsey Department of 1704-02-0001.6Ne ere Dprtet fWaterfront Development Permit 7/2 1/2009 Approved 7/2-1.;2014Environmental Protection WFD 080001

New Jersey Department of CAFRA Permit 1704-90-0014-5-CAM 4/25/1995 Approved N'AEnvironmental Protection

New Jersey Department of Ty -02Environmental Protection pe "B" Wetlands Permit W74 2/81975 Approved N/A

Section A Part 6PSEG NUCLEAR LLC

PERMIT LIST (Salem Generating Station)PERMIT No. 2216P

Agency Permit Type Permit Number Issue Status Expiration DateDate

U. S. Nuclear Regulatory Salem I -DPR-70 8/13/1976 Approved 8/13/16Commission License to operate Salent 2 - DPR-75 5/20/1981 Approved 4,/18/20

U. S. Anny Corps of Nationwide Permit CENAP-OP-R-2006-6232-45 7/14/2008 Approved 7/14/2010EngineersDelaware River Basin Groundwater Allocation Permit D-90-71 11/15/2000 Approved 11/15/2010Commnission

Delaware River Basin Surface Water Permit DRBC Docket No. D-68-20-CP 9/13/2001 Approved 9/13/2026-Commission

Delaware River Basin Water Use Contract 76-EP-482 1/13/1977 Approved N/ACommission

Delaware River Basin .Approval of wells and

Commissione installation/allocation of ground D-75-94 8/27/1975 Approved N/Awater

U.S. Department ofCommerce. NationalOceanic and Atmospheric Incidental Take Statement - sea N/A 5/14/1993 Approved N/AAdministration, and turtles and shortnose sturgeonNational Marine FisheriesService

Administrativelycontinued while

Newv Jersey Department o New Jersey Pollutant Discharge NJ0005622 6/29/2001 renewal 7/31U2006Environmental Protection Elimination System Pennit application is

reviewed

New Jersey Department of Water Allocation Permit for Activity No. WAP04000112/30/2004 Approved 1/31/2010

Environmental Protection Salem and HCGS Program Interest ID: 2216P

!New Jersey Department of Air Pollution Control OperatingNEwnersme DParotention Permit (Title V Operating BOP080003 2/2!2005 Approved 2/1/2010Environment Protection Permit)

New Jersey Department of Grant of Permanent Right-of- N/A 11/41/1971 Approved N/AEnvironmental Protection Way

Discharge Prevention,

Newv Jersey Department of Containment, andprotection Countermeasure (DPCC) Plan 170400041000 3/4/2009 Approved 7:27/2011

Environmental Pand Discharge Cleanup and

Removal (DCR) Plan Approval

New Jersey Department of Public Water SupplyEnvironmental Protection Identification Number 1704300 9/4/1980 Approved N/A

New Jersey Department of CAFRA Pertit 1704-02-0001.3 3.124L005 Approved 3/24/2010Enviromasental Protection CAF 040002

New Jersey Department of CAFR P. 1704-02-0001.4Environiental Protection CAF 050003 12/1.2005 Approved 12/1/2010

New Jersey Departnent of Freshwater Wetlands (FWVW) 1704-02-0001.4 121/2005 Approsed 12<1.2010Environmental Protection Permit FWW 050002

New Jersey Department of 1704-02-0001.4Environmental Protection CAFRA, Permit CAF 050002 8/16,2005 Approved 8/16/2010

Ness Jersey Department of Frw, Permit 1704-02-0001.4 8/'16/2005 Approved 8/16/2010Environmental Protection FWW 050001

New Jersey Department of Fi~q, Pemit 1704-02-0001.4 8/16/2005 Approved 8/16/2010

Environmental Protection FWW 050002

New Jersey Department of 1704-02-0001.4Waterfront Development Penti 8/16/2005 Approved 8/16/2010Environmental Protection WED 050001

New JrseyDepatmen of1704-02-0001.4New Jersey Department of Waterfront Development Permi 17080001 7/21/2009 Approved 7/21/2014

Environmental Protection WVFD 08000 1

The State of New Jersey Riparian License 69-80 8/29A1972 Approved NIAU.S. Department of the Deed of Easement N/A 4/24/1968 Approved N/A

Arms' I

ENCLOSURE 6

Water Conservation and Drought Emergency Plan

PSEG Nualear LLCP.O. Boi: 23C, :a-incoc Bridge, NJ 08038-0236

0 PEJAN 2 8 2008 Nuclear LLC

SCH08-011

CERTIFIED MAILRETURN RECEIPT REQUESTEDARTICLE NUMBER 7006 0100 0004 0657 9706

Diane Zalaskus, P.E., Section ChiefNew Jersey Department of Environmental ProtectionDivision of Water ResourcesBureau of Water AllocationP.O. Box 426Trenton, NJ 08625-0426

PSEG NUCLEAR LLCWATER ALLOCATION PERMIT NO. 2216PWATER CONSERVATION PLAN BIENNIAL UPDATE - 2008DROUGHT EMERGENCY PLAN

Dear Ms. Zalaskus:

In accordance with the conditions of Water Allocation Permit No. 2216P as issued bythe New Jersey Department of Environmental Protection, PSEG Nuclear LLC hasprepared and enclosed the above referenced Water Conservation Plan and Drought.Emergency Plan.

Any questions regarding this report may be referred to W. Gamon Biggs at (856) 339-2678.

Sincerely,

Clifto GibsonSalem Environmental & Radwaste Supervisor

Enclosures (2)

D. Zalaskus 2JAN 2SCHO-0l 1 JpC J. Gheen

New Jersey Department of Environmental ProtectionDivision of Water ResourcesBureau of Water AllocationP.O. Box 426Trenton, NJ 08625-0426

S

S

JAN 200;zno

GROUNDWATER CONSERVATION PLANAND

DROUGHT EMERGENCY

WATER SUPPLY PLAN

FOR

PSEG NUCLEAR LLCALLOWAYS CREEK NECK ROAD

HANCOCKS BRIDGE, NJ 08038

2008

p. I of 6

JAN 2 8 2008Submit biennially to: Bureau of Water Allocation

P.O, Box 426Trenton, NJ 08625-0426

LARGE VOLUME USERS WATER CONSERVATION PLAN WORKSHEET

PERMITTEE: PSEG Nuclear LLC

CONTACT PERSON: Clifton Gibson ADDRESS: PSEG Nuclear LLCChemistry, Radwaste and EnvironmentalM/C S07P.O. Box 236Hancocks Bridee, NJ 08038

ALLOCATION PERMIT NO: 2216P

DATE: January 30, 2008

A. WATER SYSTEM

1. Allocation: 300 mgy, 43.2 gm, and 2,900 gpm

2. List sources of water, include permit number:

Well Permit No.

34-00757*34-00758*34-0103134-0151234-0107334-01074

Well Name Aquifer

PW-2PW-3PW-5PW-6HC-1HC-2

Mt. Laurel-WenonabMt. Laurel-WenonahUpper RaritanMiddle RaritanUpper RaritanUpper Raritan

*Inactive, Emergency backup use only

0p. 21 of 6

JAN 2 9

3. Metering:raw waterfinished waterto treatment systemrecharged waterrecycled water

(circle one)N NA

Y : NAY NAY • NAY NA

WELL 4. Date of Last Meter Calibration 5a. Supply System Capacity: mgdPW-2 01/24/08 0.432PW-3 12/27/02 : No longer has a pump 0.864PW-5 7/31/07 1.15

•PW-6 01/24/08 0.864HC-1 7/11/05 1.08HC-2 01/25/08 1.08

5b. System Storage Capacity: 1.5 m,

6. Pumping Schedule: All wells are pumped as needed.

7. Interconnections: N/A

8. List well permit numbers, local ID and depths of Monitoring Wells (attach separate sheets)

Well No.

OW-6OW-GOW-IOW-J

Well Permit No. Depth (Feet)

34-01511 113234-00970 31134-01011 79034-04055 840

Status

MonitoringMonitoringMonitoringMonitoring

9. Source of potable supply:

Well Permit No. Well Name34-01031 PW-534-01512 PW-634-01073 HC-134-01074 HC-2

p. 3 of 6

JAN 2: ý 2008

B. ANALYSIS OF WATER USE

1. Demand:current 2007last year 2006peak 2006nextyear 20085 year 2012

mg d0.540.770.770.540.54

16.318.0

23.416.316.3

196.0280.0280.0196.0196.0

375.0534.7534.7375.0375.0

+ Current year usage based on metered flow from January 2007 through December 2007

2. Type of Use:consumptive:nonconsumptive:unaccounted for

3. Actual Use:non-contact cooling:process:makeup:contact cooling:potable:other (explain):

19.5 %64.1 %16.4 %

0.0 %80.3 %00.0%00.0 %3.3 %

16.4 %''Unaccounted For.

4. Attach water balance.

See Attached

C. UNACCOUNTED FOR WATER

100 -

100-

gallons of water used

gallons of raw water entering syste

(124.43 + 39.37) MG---------------

196.0 MG

X 100 = % unaccounted form

X 100 = 16.4 % unaccounted for 2007

0p. 4 of 6

D. WATER CONSERVATION PRACTICES

1. Do you currently use any (water conservation) devices? YES

Low flow nozzles have been installed in the facility's lavatories. This system saves an estimated 0.0005mgd. It should be noted that potable/sanitary water use, accounts for only 3.3 percent of the totalgroundwater use at this facility.

"Gator bags" are used for watering trees at PSEG Nuclear LLC. The 20-50 gallon bags slowly releasewater over a period of time, slowly soaking the roots of the tree. The use of the bags limit water loss causedby evaporation and runoff.

2. Do you currentlyreuse or recycle water? YES

PSEG Nuclear LLC has investigated the possibility of recycling water or using recycled water at thisfacility. Water recycling has been instituted in several areas such as:

1. The low conductivity backwash water from Unit One and Unit Two Condensate Polishing System isrecycled back to the Raw Water Basin for use in the Demineralizer Water Plant. Each polisher tank

holds 35,000 gallons. Total recycled water from both units saves an estimated 5.2 million gallons peryear.

2. Radioactive Waste Process Water is purified and returned to the Condensate Storage Tank. This savesan estimated 9 million gallons per year.

3. Steam generator blowdown is recycled back to the condenser under normal plant operation. Thisresults in the reuse of approximately 21.7 mgm of water.

3. Are work practices scheduled to minimize water use? YES

PSEG Nuclear LLC continually evaluates facility water use and strives to maximize reuse. Driving this isthe need to retain heat within the steam cycle. Each BTU lost through either feedwater cooling or waterlosses represents fuel used to create steam and electricity. Additionally, unnecessary replacement of theultrapure water used in the steam cycle represents wasted resources with a replacement value ofapproximately $20,000 per million gallons. This cost is expended in demineralization treatment before useand wastewater treatment prior to discharge.

Any water losses due to leaks are promptly addressed as a maintenance issue and prioritized according toprocedure.

Steam relief to the atmosphere has been Tinimized during shut-down activities. This allows for recovery ofsteam back to the condenser for purification in the Condensate Polishing System and subsequent reuse asfeedwater to the steam generators.

No additional system design modifications or water conservation modifications are currently planned.

p. 5 of 6

JANh 2 8 QG

E. WORKER EDUCATION / AWARENESS

Annual worker requalification includes water conservation awareness training and suggested common waterconservation methods as a distinct training element. Workers must achieve an 80% or better to retain their accessbadge for site work.

Drought Emergency Water Supply Plan

The water used at this facility is diverted from production wells located on-site. Several shallow wells, designatedas emergency wells, may be used to relieve user demands on the deeper aquifers should the need occur.

In the event a drought emergency is declared by the State of New Jersey, PSEG Nuclear LLC would comply withany requirements deemed necessary, up to but not including suspending electric generating operations. Due to thecritical nature of the electric generation business, it is the position of PSEG Nuclear LLC that the termination ofelectric generation would have a generally deleterious effect on the community at large by potentially depriving areasof adequate electric power. This would drive up costs through the use of more expensive electric alternatives and, inthe short term, increase ground water demand as the units are cooled to satisfy safe shut down requirements at thethree affected nuclear units.

Typical actions, which would be considered for curtailment, are as follows:

" Elimination of watering of the lawns and shrubbery

" Reduction of water use for washing vehicles, pressure washing and other non-essential activities

* Placing other well pumps in service to divert water first from a different aquifer than the one in a droughtsituation

" Use of bottled water for drinking purposes

p. 6 of 6

JAN P, 8 ztua-

Water Balance2007 Data

Total Well Production0.537 MGD

100%

Consumptive0.104 MGD

19.5%

Non-Consumptive0.345 MGD

64.2%

Domestic Supply 0.019 MGDIndustrial Process 0.326 MGD

Unaccounted For0.088 MGD

16.4%

Steam Leaks 0.104 MGD

0

ENCLOSURE 7

Production Well No.2 and 3Inactive Well Status Report

Dated January 8, 2009

0

S

PSEC" ,uciear, L.L.C,P.C. Lo:l 23C, I-amcozi- Bridcfe, NJ K1302

JAN 0 8 2009RNTuclear L.L, C.

SCH09-002

CERTIFIED MAILRETURN RECEIPT REQUESTEDARTICLE NUMBER 7008 0150 0000 5749 2563

Diane Zalaskus, P.E., Section ChiefNew Jersey Department of Environmental ProtectionDivision of Water ResourcesBureau of Water AllocationP.O. Box 426Trenton, NJ 08625-0426

PSEG NUCLEAR LLCWATER ALLOCATION PERMIT 2216PINACTIVE WELL STATUS REGISTRATION 90742008 INACTIVE WELL STATUS REPORT

Dear Ms. Zalaskus:

Enclosed is the 2008 inactive well report for Production Wells PW-S2 (3400000757)and PW-3 (3400000758).

These wells are being administratively controlled and reserved for emergency use.Well PW-S2 is exercised periodically to ensure its operability and availability foremergency use.

Any questions regarding this report may be referred to W. Gamon Biggs at (856) 339-2678.

Sincerely,

Greg ySalem Chemistry, Radwaste & Environmental Manager

Enclosures (2)

0

JAN, V L0

Ms. D. Zalaskus 2SCH09-002

C K. NajjarDelaware River Basin CommissionP.O Box 7360West Trenton, NJ 08628

Ken KomarNew Jersey Department of Environmental ProtectionDivision of Water ResourcesBureau of Water AllocationP.O. Box 426Trenton, NJ 08625-0426

Southern Bureau of Water Compliance & Enforcement ElementNJ Department of Environmental ProtectionOne Port Center2 Riverside Drive, Suite 201Camden, New Jersey 08102

J'LkN cip ~

Innctive Wefl hispection(712006)

TNACTTXVE WT CERTT A TON

This forn must be-signed by the highest ranking individual at facilite with overallresponsibility for that facility. A separate form must be completed and submitted for eachinactive well, by January 31 ) of each year.

Water Allocation permit Number: WAAP040001 (2216P)

Peimittee: Salem and T-npi-el •nrt~g q~~l

Well Permit Number: ;40000057•7 Local Well ID: PW -

Well is: _X_ operable (Check one)

date well was last operated: Nrvemhfibr 14 2008

number of hours run: D__ 2gallon pumped: 9M0

__ not operable.

I certiif under penalty of law that I have personally examined the above referenced well andfound that the well is protected against vandalism and surface contamination, and is not a threatto public health.

Date Signature

Rohert C( rgrnName (please print)

S2e8nl Station Vine Pregi•ientTitle

Complete all parts and submit to: Bureau of Water AllocationWater Resources Management SectionP.O. Box 426Trenton, New Jersey 08625-0426

Should you have any questions please contact the Water Resources Management Section at (609)292-2957.

OiK 61

Inacivt WVell hisPection(T/2006.)

ITNACITTVF WFTT, C-J7TTPTCkTJCQ

This form must be signed by the highest ranking individiual at facility witb overall.] .responsibility for that facility. A separate form must be completed and submitted for eachinactive well, by January '1 " of each year.

Water Allocation permit Number: W APO400 .(2216P)

Permittee: Saleor srd %Npe (Creek Gh-reratinc ,Rtatinn

Well Permit Number: 3D2DfQ2o_7_ Local Well ID:

Well is: - operable (Check one)

- date well was last operated:- number of hours run:- gallon pumped:

X not operable

I certify under penalty of law that I have personally examined the above referenced well andfound that the well is protected against vandalism and surface contanmination, and is not a threatto public health.

Date Signature

tnhbert C. RrrpiName (please print)

Rle•r] Station Vice Presidcenf

Title

Complete all parts and submit to: Bureau of Water AllocationWater Resources Management SectionP.O. Box 426Trenton, New Jersey 08625-0426

Should you have any questions please contact the Water Resources Management Section at (609)292-2957.

James E. McGreevey DepGovernor

P.C

CERTIFIED MAILRETURN RECEIPT REQUESTED

atrte of NrfuTr-r e-

NON-PSEG

Division).Box 029

Phone:Fax:

J(J.kLJLL•LLL ,,.JZ ............... - •..•,

Af )ter Qualityrenan, NJ 08625-002'(60 292-48fa5&?84-793b

LU

LL-al--

0.0'-50

0

Lj

I..-

-~: -1=- .'-. *1.

-V.

I ý FBradley M, mpbell

Commis•si ner

LU LU I i J

LU

0

<- ;_ LU LU F-,.

Gabor Salaman, Manager - Nuclear SafetyPSEG Nuclear LLCPO Box 236/N21Alloway Creek Neck Road

Hancocks Bridge, NJ 08038

-j'C

z0

milI>Li

I~~

I

Ll

Re: Final Surface Water Administrative Mod Permit Action - Clarificationof Stormwate" RequirementsCategory- B-Industrial Wastewater, NJPDES Permit No. NJ0025411Hope Creek Generating Station, Lower Alloways Creek Twp., Salem County

Dear Permittee:

The Department issued your final New Jersey Pollutant Discharge Elimination System (NJPDES) permitrenewal on December 31, 2002. As you know, a clarification was issued on February 24, 2003 to change theexpiration date from February 31, 2008 to February 29, 2008. It has come to our attention that"certain otherpermit conditions need clarification. Therefore, this administrative modification serves to. chýnge thefollowing permit conditions:

- Delete the stormwater monitoring requirements indicated on page 1 of 16 of Part III. Although theserequirements were included in the draft permit issued on November 7, 2002, it was clearly theDepartment's intent to delete these requirements in any final permit action and the inclusion of theserequirements was dearly an error. This is discussed on page 8 of the Response to Comments documentincluded in the December 31, 2002 final permit action.

- Delete Attachment 1. Specific stormwater requirements are included in Part IV where the language inPart IV is either identical to Attachment 1 or, in instances where the language is slightly reworded, theintent is the same. It is redundant to include both the stormwater conditions of Part IV and Attachment1 and serves to complicate the permit. As a result, Attachment 1 has been deleted.

Please replace Part III, page 1 of 16 and Attachment 1 with the enclosed "placeholder" sheets. Questions orcomments regarding the final action should be addressed to Susan Rosenwinkel at (609) 292-4860.

Sincerely,

Pilar Patterson, ChiefBureau of Point Source Permitting Region 2

Enclosurescc: Permit Distribution ListMasterfile #: 15647; PI #: 46815

Fncv dsw.rrfNew Jersey is an Equal Opportunity Employer

Recycled Paper

Ne Jerse Deatmn ofEvrnetlPoeto

NEW JERSEY POLLUTANTDISCHARGE ELIMINATION SYSTEM

0

The New Jersey Department of Environmental Protection hereby grants you a NJPDES permit for the facilitylactivity named in this document. Thispermit is the regulatory mechanism used by the Department to help ensure your discharge will not harm the environment. By complying with the termsand conditions specified, you are assuming an important role in protecting New Jersey's valuable Water resources. Your acceptance of this permit is anagreement to conform with all of its' provisions when constructing, installing, modifying, or operating any facility for the collection, treatment, ordischarge of p161lutants to waters of the state. If you have any questions about this document, please feel free to contact the Department representativelisted in the permit cover letter. Your cooperation in helping us protect and safeguard our state's environment is appreciated.

Permit Number: NJ0025411

Final: Consolidated Minor Modification

Permittee:PSEG NUCLEAR LLCPO BOX 236/N21ALLOWAY CREEK NECK RDHANCOCKS BRIDGE, NJ 08038

Property Owner:PUBLIC SERVICE ELECTRIC AND GAS CO..80 PARK PLAZAPO BOX 570NEWARK, NJ 07102

Co-Permittee:

Location Of Activity:HOPE CREEK GENERATING STATIONARTIFICIAL ISLANDFOOT OF BUTTONWOOD RDLOWER ALLOWAYS CREEK, NJ 08038

Authorization(s) Covered Under This Approval Issuance Date Effective Date Expiration Date

B - Industrial Wastewater 12/31/03 3/1/03 2/29/08RF - Stormwater

Authorization(s) Covered Under This Approval Issuance Date Effective Date Expiration DateClarification of Permit Conditions. 3/12/03 3/1/03 2/29/08

By Authority of:Commissioner's Office DEP AUTHORIZATION

Pilar PattersonBureau of Point Source Permitting - Region 2Division of Water Quality.

(Terms, conditions and provisions attached hereto)

HOPE CREEK G*.TING STATION, Lower Alloways Creek

PART IIILIMITS AND MONITORING REQUIREMENTS

A. STORMWATER DISCHARGE

Monitored Location Group Members463A Storinwater, 464A Stormnwater, 465A Stormwater

Pe * 1J0025411PER030001 Consolidated Minor. ermit Action

Limits And Monitoring Requirements Page 1 of 16

ATTACHMENT 1:CONTENTS OF THE

STORMWATERPOLLUTION PREVENTION PLAN

Pages i and 1 - 8 have been deleted via this minor permit. modification effective March 1,2003. All requirements as contained in Attachment 1 of the final permit renewal issued onDecember 31, 2002 are either identical in wording or in intent to those conditions contained

in item H of Part IV-Stormwater thereby making Attachment 1 redundant. As a resultAttachment I is being deleted.

I

'ý1zrte of 'NefI 4JCra2q

Department of Environmental Protection

Division of Water QualityP.O. Box 029 Trenton, NJ 08625-0029

Phone: (609) 292-4860Fax: (609) 984-7938

ames E. McGreeveyGovernor

Bradley M. Campbel]Commissioner

FEB 2 4 2003

CERTIFIED MAILRETURN RECEIPT REQUESTED

Gabor Salamon, Manager - Nuclear Safety And LicensingPSEG Nuclear LLCPO Box 236Alloway Creek Neck RoadHancocks Bridge, NJ 08038

Re: Final Consolidated Renewal Permit Action - Authorization Page CorrectionCategory(s): B -Industrial Wastewater

RF: -StornwaterNJPDES Permit No. NJ0025411HOPE CREEK GENERATING STATIONLower Afloways Creek, Salem County

Dear Permittee:

The Department issued your final NJPDES/DSW permit identified above on December 31, 2002. It has come tothe Department's attention that a typographical error has resulted in an incorrect expiration date of February 31,2008 on the final authorization permit page. The enclosed final authorization permit page reflects the correctexpiration date of February 29, 2008. Please replace the old page with this revised page in your final permit.

Questions or comments regarding this action should be addressed to Susan Rosenwinkd at (609) 292-4860.

Sinc

Pilar Patterson, Chief

Bureau of Point Source Permitting Region 2

Enclosures

cc: Pennit Distribution List

Masterfile #: 15647; PI #: 46815

New Jersey is on Equal Opportunity Employer

'T = . . I -- I. * -

0NEW JERSEY POLLUTANT

DISCHARGE ELIMINATION SYSTEM

The New Jersey Department of Environmental Protection hereby grants you a NJPDES permit for the facility/activity named in this document. -This

permit is the regulatory mechanism used by the Department to help ensure your discharge will not harm the environment. By complying with the terms

and conditions specified, you are assuming an important role in protecting New Jersey's valuable water resources. Your acceptance of this permit is anagreement to conform with all of its provisions when constructing, installing, modifying, or operating any facility for the collection, treatment, or.

discharge of pollutants to waters of the state. If you have any questions about this document, please feel free to contact the Department representativelisted in the permit cover letter. Your cooperation in helping us protect and safeguard our state's environment is appreciated.

Permit Number: NJ0025411

Final: Consolidated Renewal Permit Action

Permittee:PSEG NUCLEAR LLCPO BOX 236ALLOWAY CREEK NECK RDHANCOCKS BRIDGE, NJ 08038

Property Owner:PUBLIC SERVICE ELECTRIC & GAS COMPANY80 PARK PLAZAPO BOX 570NEWARK, NJ 07101

Co-Permittee:

Location Of Activity:HOPE CREEK GENERATING STATIONARTIFICIAL ISLANDFOOT OF BUTTONWOOD RDLOWER ALLOWAYS CREEK, SALEMCOUNTY,- NJ 08038

'Authorization(s) Covered Under This Approval Issuance Date Effective Date Expiration Date

B -Industrial Wastewater . 12/31/2002 03/01/2003- , 02/31/2008

RF -StormwaterExpiration Date Correction 12/31/2002 03/01/2003 02/29/2008

By Authority of:Commissioner's Office DEP AUTHORIZATION

Pilar PattersonBureau of Point Source Permitting - Region 2Division of Water Quality

(Terms, conditions and provisions attached hereto)

islhb . ' -- -

\ L~JAN 2 T~?o 2D .

§faz f 'Nrffi Tj2r5ZV®mes E.McOGreevey Department of Environmental Protection Bradley M. Campbý]

Governor Division of Water Quality Commissioner

P.O. Box 029 Trenton, NJ 08625-0029Phone: (609) 292-4860

Fax: (609) 984-7938

CERTIFIED MAILRETURN RECEIPT REQUESTED JAN 120,

Gabor Salamon, Manager - Nuclear Safety and LicensingPSEG Nuclear LLCP.O. Box 236Hancocks Bridge, NJ 08038

Re: Final Consolidated Renewal Permit ActionCategory(s): B -Industrial Wastewater

RF -StormwaterNJPDES Permit No. NJ0025411HOPE CREEK GENERATING STATIONLower Alloways Creek, Salem County

Dear Perrnitte:

Enclosed is a final New Jersey Pollutant Discharge Elimination System (NJPDES) permit action identified abovewhich has been issued in accordance with N.JA.C. 7:14A. This permit action authorizes discharge activity(ies)applicable to the discharge category(ies) identified above. This permit action authorizes the penmittee to dischargecooling tower blowdown with internal monitoring points, and stormwater with tidal influx.

A summary of the significant and relevant comments received on the draft action during the public commentperiod, the Department's responses, and an explanation of any changes from the draft action have been included inthe Response to Comments document attached hereto as per N.J.A.C. 7:14A- 15.16.

.Any requests for an adjudicatory hearing shall be submitted in writing by certified mail, or by other means whichprovide verification of the date of delivery to the Department, within 30 days of receipt of this ConsolidatedRenewal Permit Action in accordance with NJA.C. 7:14A-17.2. You may also request a stay of any contested permitcondition as per N.J.A.C. 7:14A-17.6 et seq. The adjudicatory hearing request must be accompanied by a completedAdjudicatory Hearing Request Form; the stay request must be accompanied by a completed Stay Request Form(forms enclosed).

As per NJA.C. 7:14A-4.2(e)3, any person planning to continue discharging after the expiration date of an existingNjPDES permit shall file an application for renewal at least 180 calendar days prior to the expiration of the existingpermit.

All monitoring shall be conducted in accordance with 1) the Department's "Field Sampling Procedures Manual"applicable at the time of sampling (N.JA.C. 7:14A-6.5(b)4), and/or 2) the method approved by the Department inPart IV of the permit. The Field Sampling Procedures Manual is available through Maps'and Publications SalesOffice; Bureau of Revenue, PO Box 417, Trenton, New Jersey 08625, at (609) 777-1038.

New Jersey is an Equal Opportunity Employer

pcr_.Fncv.rtf Recycled Paper

As a result of this permit action, your monitoring report forms have been changed. Enclosed with this permit arethe new monitoring report forms (N4RFs). Beginning the effective date of the permit, please use the new MRFs.

) Questions regarding the new forms shall be directed to this Bureau for further clarification.

Questions or comments regarding the final action should be addressed to Susan Rosenwinkel at (609) 292-4860.0

PBreilaroBureau of Permitting Region 2

Enclosures

cc: Permit Distribution List

Masterfile #: 15647; PI #: 46815

perFncv.mt

HOPE CREEK GENERATING STATION NJPDES Permit Number: NJ002541 ISurface Water Renewal Permit Action Program Interest Number: 46815

eTable of Contents

This permit package contains the items listed below:

1. Cover Letter

2. Table of Contents

3. Response to Comments

4. NJPDES Permit Authorization Page

5. Part I - General Requirements: NJPDES

6. Part II - General Requirements: Discharge Categories

7. Part III - Limits and Monitoring Requirements

8. Part IV - Specific Requirements: Narrative

O 9. Attachment 1 - Contents of the Stormwater Pollution Prevention Plan (SPPP)

10. Attachment 2 - SPPP Preparation Certification

11. Attachment 3 - SPPP Implementation and Inspection Certification

0

tocdsw.rtf

STAY REQUEST AND TRACKING FORM

I. Permit Containing Condition(s) to Be Stayed:

HOPE CREEK GENERATING STATION

Issuance Date of Final Permit Decision Permit Number12/31/02 NJ0025411

II. Person Requesting the Stay(s):

Name/Organization

Address

Name of Attorney (if applicable)

Address of Attorney

Telephone Number Telephone Number of Attorney

N.J-A.C. 7:14A-17.6 provides for stays of contested permit conditions. In order for the Department to consider arequest for stay, the person making the request must submit a written request to the Department by certified mail orother means which provides verification of the date of delivery. In the request for a stay of each permit condition, awritten evaluation must be submitted which addresses each of the factors at NJA.C. 7:14A-17.6(c). Briefly stated,these factors include: 1) the permittee's ability to comply with the permit condition using existing treatment facilities,2) the permittee's ability to comply with the permit condition by implementing low cost short-term modifications tothe existing treatment facility, 3) the level of pollutant control actually achieved using short term modifications, 4)the cost to comply with the condition and 5) the environmental impacts granting a stay will have on the receivingwaterbody.

This completed stay request form, along with the evaluations mentioned above, shall be submitted to both PilarPatterson, Chief, Bureau of Point Source Permitting - Region 2, Division of Water Quality, Department ofEnvironmental Protection, PO Box 029, Trenton, New Jersey, 08625-0029 and the Office of Legal Affairs,Department of Environmental Protection, PO Box 402, Trenton, New Jersey 08625-0402. A person seekingconsideration as party to the action who has requested an adjudicatory hearing in accordance with NJA.C. 7:14A-17.2 may also request a stay provided notice of the request is also provided to the permittee(s).

Signature: Date:

,For NJPDES permits, the procedures for requesting a stay of a final permit condition and for theDepartment's evaluation and processing of such requests are set forth in NJ.A.C. 7:14A-17.

ADJUDICATORY HEARING REQUEST CHECKLIST AND TRACKING FORMFOR INDIVIDUAL NJPDES PERMITS*

I. Permit Being Appealed:

HOPE CREEK GENERATING STATION

Issuance Date of Final Permit Decision Permit Number12/31/02 'NJ0025411

II. Person Requesting Hearing:

Name/Organization Name of Attorney (if applicable)

Address Address of Attorney

Telephone Number Telephone Number of Attorney

III. Status of Person Requesting Hearing (Check One):

Permittee under the permit number identified above.CanpleteA. and C thmv ig. of SectionIV belowv

Person seeking consideration as a party to the action.C"npete B. thmvghL of/Section IV below,

IV. Include the following information as part of your request:A. If you are a pernittee under the permit number identified above:

1. For the Office of Legal Affairs only, a copy of the permit clearly indicating the permit number andissuance date;

2; A list of the specific contested permit condition(s) and the legal or factual question(s) at issue for eachcondition, including the basis of any objection;

3. The relevance of the legal and/or factual issues to the permit decision;4. Suggested revised or alternative permit conditions and how they meet the requirements of the State or

Federal Act; and5. Information supporting the request or other written documents relied upon to support the request,

unless this information is already in the administrative record (in which case, such information shall bespecifically referenced in the request).

B. If you are a person seeking consideration as a party to the action:1. A statement setting forth each legal or factual question alleged to be at issue;

*For NJPDES permits, the procedures for requesting an adjudicatory hearing on a final permit decision and for the

Department's evaluation and processing of such requests are set forth in NJ.A.C. 7:14A-17.2. A statement setting forth the relevance of the legal or factual issue to the permit decision, together with

a designation of the specific factual areas to be adjudicated;3. A clear and concise factual statement of the nature and scope of your interest which meets the criteria

set forth at N.J.A.C. 7:14A-17.3 (c)4;4. A statement that, upon motion by any party granted by the administrative law judge, or upon order of

the administrative law judge's initiative, you shall make yourself, all persons you represent, and all of

your officers, directors, employees, consultants, and agents available to appear and testify at theadministrative hearing, if granted,

5. Specific references to the contested permit conditions, as well as suggested revised or alternative permit Wconditions, including permit denials, which, in your judgment, would be required to implement thepurposes of the State Act;

6. Identification of the basis for any objection to the application of control or treatment technologies, ifidentified in the basis or fact sheets, and the alternative technologies or combination of technologieswhich, in your judgment, are necessary to satisfy the requirements of the State Act;

C. The date you received notification of the final permit decision;D. The names and addresses of all persons whom you represent;E. A statement as to whether you raised each legal and factual issue during the public comment period in

accordance with N.J.A.C. 7:14A-15.13 [add if necessary: and in aoardancwih repeakd N.J.A.C 7:14A -8.4, ifthepubiccanm ýbgano ~d~d before May 5, 199/)];

F. An estimate of the amount of time required for the hearing;G. A request, if necessary, for a barrier-free hearing location for disabled persons;H. A clear indication of any willingness to negotiate a settlement with the Department prior to the

Department's processing of your hearing request to the Office of Administrative Law; andI. This form, completed, signed and dated with all of the information listed above, including attachments, to:

1. Office of Legal AffairsATTENTION: Adjudicatory Hearing RequestsDepartment of Environmental Protection401 East State StreetPO Box 402, Trenton, New Jersey 08625-0402

2. Pilar Patterson, Chief, Bureau of Point Source Pennitting - Region 2Bureau of Point Source PermittingDepartment of Environmental Protection401 East State StreetPO Box 029, Trenton, New Jersey 08625-0029

3. Any other person named on the permit (if you are a pennittee under that permit).4. The permittee(s) (if you are a person seeking consideration as a party to the action).

V. Signature: Date:

Working Cost Center 4 Susan Rosenwinkel, Bureau of Point Source Permitting - Region 2

Response to CommentsPage-1 of 8Permit No. NJ0025411

New Jersey Department of Environmental ProtectionDivision of Water Quality

Bureau of Point Source Permitting - Region 2

-RESPONSE TO COMMENTS

Comments were received on the draft NJPDES Permit Renewal No. NJ0025411 issued on November 7,2002. The thirty (30) day public comment period began on November 19, 2002, when the Public Noticewas published in the Today's Sunbeam. It was also published in the DEP Bulletin on November 13,2002. It ended on December .19,2002. The following person[s] commented during the public commentperiod:

1. Gabor Salamon, Manager-Nuclear Safety and Licensing, PSE Nuclear LLC in a letter datedDecember 24, 2002.

A summary of the timely and significant comments received, the New Jersey Department. ofEnvironmental Protection's (Department) responses to these comments, and an explanation of anychanges from the draft action have been included below:

Comments on Chemical-Specific Conditions forOutfalls DSNs 461A, 461C, and 462B

Fact Sheet, Section 5, paze 5 of 28 - Station Outfalls and Discharge Components

Comment 1: The draft permit states that "[While] the permittee's stormwater discharges are currentlyregulated under Stormwater Pollution Prevention Plan requirements, the Department has determined itappropriate to regulate the stormwater discharges under the General Stormwater Permit NJ00883 15which will be issued upon finalization of this draft renewal permit.". PSEG Nuclear LLC ("hereafterPSEG") believes it is not appropriate to regulate the stormwater discharges under the General.Stormwater Permit concurrent with the stormwater requirements contained in this individual NJPDESpermit. The permit application requested continued regulation under the Stormwater PollutionPrevention Plan requirements and those requirements appear to be continued, though modified, in theDraft permit. PSEG requests the sentence quoted above be deleted.

Response 1: The Department agrees that the inclusion of this sentence was made in error. The permitteeis correct in that this subject permit contains individual stormwater requirements as noted throughout therest of the permit.. This clarification is hereby noted for the Administrative Record.

Fact Sheet, Section 5, page 7 of 28 - Yard Drains (DSN's 463A, 464A, 465A)

Comment 2: The Department has renamed outfall DSN 462A as outfall DSN 465 because the NJEMSdatabase will not accept both DSN 462A and DSN 462B. DSN 462B has been retained because it has aregulatory history where limits and monitoring conditions have been set and data have been collected.PSEG reminds the Department that DSN 462A also has a regulatory history where limits and monitoringconditions were set and data have been collected for the period October 1985 through March 1997.

Response 2: The Department agrees that DSN 462A has a regulatory history although the Departmentmaintains that it is appropriate to rename DSN 462A as outfall DSN 465 in this subject permit action due

Response to CommentsPage 2 of 8Permit No. NJ002541 1

to the reason noted above. Therefore, no changes to the final 5ermit have been made as a result of thiscomment, although the Department notes this information for the Administrative Record.

Fact Sheet, Section 8.B, page 10 of 28 - DSN 461A

Comment 3: The Department has changed the frequency for monitoring Chlorine Produced Oxidants(CPO) from three times per week to continuous monitoring. The data collected during the three times perweek monitoring conducted by PSEG during the term of the existing permit demonstrates that CPO isnot normally present in the discharge as indicated in the Permit Summary Table at page 18 of 28. PSEGbelieves continuous monitoring is not warranted and periodic grab sampling is more appropriate.

PSEG has responsibly performed an evaluation to determine the CPO concentration when there was areason to believe unmonitored CPO may have been discharged. In June 2000, a discharge occurred thatcontained sodium hypochlorite at a time that no effluent monitoring was in progress. PSGEG notifiedthe Department, conducted an internal investigation, and performed calculations to determine theconcentration of CPO in the effluent. CPO was determined to be within the limitations of the NJPDESPermit. Although a continuous monitoring device would have precluded the need for PSEG to calculatethe effluent CPO concentrations, a continuous monitoring device would not have changed the effluentconcentration.

Continuous chlorine analyzers were installed to monitor the cooling tower blowdown (DSN 461A) until1997, when the Department modified the requirement for CPO monitoring to three times per week. Theinherent difficulty of maintaining analyzer operations in this region of the Estuary was demonstratedduring this period of continuous monitoring. The two primary methods for continuous chlorine analysisare amerometric and specific-ion electrode. The high suspended solids and silt concentrations present in ,the Estuary tend to clog instrument flow pats and specific ion electrode membranes. The abrasiveness of Wthe silt also causes excessive wear on moving components such as pumps and valves. These factors limitthe effectiveness of continuous chlorine analyzers because of the extensive routine and correctivemaintenance.

PSEG requests the continuous monitoring requirement be deleted. If the three times per week currentsampling program is inadequate, PSEG recommends modifying the sample frequency to daily (sevendays per week).

Response 3: The Department maintains that a continuous sampling frequency is appropriate for DSN461A. This discharge is continuously chlorinated and is of a significant volume. In addition,.theDepartment notes that there was a unanticipated discharge of chlorine produced oxidants in June 2000.Although the Department agrees that the installation of continuous chlorine monitors may not haveprevented this discharge, the presence of continuous chlorine monitors could have better evaluated theamount of chlorine produced oxidants in the discharge in comparison to an evaluation by calculations.

No changes.to the permit have been made as a result of this comment.

Fact Sheet, Section 8.B, page 11 of 28 - DSN 461A

Comment 4: The last paragraph indicates that effluent limitations for oil .and grease have been includedat DSN 461A. For clarification, the parameter limited at DSN 461C equivalent to oil and grease is totalpetroleum hydrocarbons.

Response to CommentsPage 3 of 8Permit No. NJ002541 1

Response 4: The permittee is correct in noting that total petroleum hydrocarbons is limited at DSN461 C; therefore, this sentence on page 11 erroneously identifies oil and grease as opposed to totalpetroleum hydrocarbons. The Department has correctly notedthat total petroleum hydrocarbons islimited at DSN 461C as indicated on page 5 of Part III as well as on pages 12 and 19 of the Fact Sheet.The Department hereby notes this clarification pertaining to page 11 for the Administrative Record.Because the correct parameter is included on page 5 of Part III, no changes to the final permit arenecessary as a result of this comment.

Fact Sheet, Section 8.b.. page 13 of 28 - DSN 462B

Comment 5: The Department has incorporated a monthly average concentration limit for BOD5 of 30mg/L and a weekly limit of 45 mg/L as DSN 462B. PSEG believes these new limitations are notappropriate for this discharge. The reference to N.J.A.C. 7: 14A-12.2(b) is not appropriate since DSN462B discharges to DSN 461A and, therefore, DSN 462B is not a "directdischarge". N.J.A.C. 7:14A-12.2 is only applicable to a direct discharge. Upon completion of the rerouting of the DSN 462Bdischarge to DSN 461 A, this is an internal monitoring point and not a direct discharge (1997 Permit FactSheet, page 60 of 86).

The Department indicates these limitations are particularly appropriate where the flow volumes fluctuateover time. The effluent flow from DSN 462B for January 2001 through February 2002 was an averageof 0.01 MGD and a maximum of 0.03 MGD, and for the period of April 1997 through March 2001 theeffluent flow was an average of 0.02 MGD and a maximum of 0.07 MGD (Permit Summary Table, page20 of 28). The maximum effluent flow during that five year period was only 25% of the design flow ofthe sewage treatment plant (0.28MGD) and the range of values does not indicate a highly variable flowthat would warrant imposition of additional limitations. The monthly minimum Percent Removal ofBOD 5 limitation of 87.5% (more stringent than N.J.A.C. 7:14A-12.2(b) and the monthly average loadinglimitation for BOD 5 of 8 kg/day (based on the DRBC allocation) have been adequate since the 1985NJPDES Permit and new limitations are not warranted at this time.

Response 5: The Department has determined that the intent of N.J.A.C. 7:14A- 12.2(b) is that thelimitations contained in this regulation pertain to direct discharges to surface water as opposed todischarges to a municipal utilities authority which then discharge to surface waters. Therefore, theDepartment does not agree that N.J.A.C. 7:14A-12.2(b) should be interpreted to mean that theselimitations are not appropriate for this internal monitoring point. These secondary treatment limitationsset the standard for the level of treatment appropriate for sanitary discharges and the Departmentmaintains that they are appropriate for DSN 461 C since it is a sanitary discharge.

The Department also maintains that concentration limits are particularly appropriate for this dischargegiven the variable flow rates of influent sanitary wastewater. It is the Department's understanding thatthe amount of personnel present at the plant can widely fluctuate during refueling outages given the factthat the facility makes use of this time to maintain Station operations which result in the presence ofadditional Station personnel. Therefore, the Department has determined that both concentration andmass limitations are appropriate for this discharge.

The Department recognizes that the permittee typically discharges well below the design flow rate;however, N.J.A.C. 7:14A-12.2 does not make exception for this circumstance. The Department alsorecognizes that the mass limit of 8 kg/day for BOD5 may be more stringent than the concentration limitsat N.J.A.C. 7:14A-12.2 given certain flow circumstances; however, the Department has determined thatit is required to apply these concentration limits.

Response to CommentsPage 4 of 8Permit No. NJ002541 1

No changes to the permit have been made as a result of this comment.

Fact Sheet, Section 8.b, page 13 of 28 - DSN 462B

Comment 6: The Fact Sheet states that there is a weekly average TSS limitations of 45 mg/L at DSN462B in the current permit and thus this limitation was retained. The weekly average TSS limitation wasdeleted from DSN 462B upon rerouting DSN 462B to discharge to DSN 461A (see 1997 NJPDESPermit, Part III-B/C, Section 1.C.2). The Fact sheet for the 1997 NJPDES Permit states that "the seven-day average limitation of 45 mg/L will be deleted since this will be an internal monitoring point andthere will not be a direct discharge". Since the limitation is not retained from the current Permit andDSN 462B is not a direct discharge, PSEG requests the weekly average limitation for TSS be deleted.

Response 6: The Department recognizes that it has incorrectly stated that the weekly average limitationfor TSS has been retained from the existing permit. Nonetheless, based on the rationale indicated inResponse 5 above, the Department maintains that inclusion of this limit is appropriate based on.thesecondary treatment standards.

No changes to the permit have been made as a result of this comment.

Fact Sheet, Section 8.K, page 16 of 28 - DSN 461A

Comment 7: Consistent with the comments above regarding continuous CPO monitoring, if theDepartment determines that continuous CPO monitoring is not required, the schedule of compliancewould not be required.

Response 7: Please refer to Response 3.

Fact Sheet, Section 13, page 20 of 28

Comment 8: The permit summary table for DSN 462B indicates that there is a 45 mg/L TSS weeklyaverage limitation. As discussed above, the current permit does not contain a weekly average limitationof reporting requirement for TSS.

Response 8: The Department agrees that the 45 mg/L TSS weekly average limitation was deleted in theFebruary 14, 1997 NJPDES Permit as noted in Section .1.C.2, Part III-B/C. Nonetheless, the Departmenthas determined it appropriate to include this limitation at this time for the reasons discussed in Response6.

Permit, Part III, Section A, Table IH-B-I, page 2 of 16

Comment 9: As discussed above, PSEG believes continuous monitoring is not warranted and periodicgrab sampling is more appropriate. The continuous monitoring requirement identified as "final" shouldbe deleted and the three times per week grab sample identified as "initial" should be retained for the termof the Permit.

Response 9: Please refer to Response 3.

Permit, Part m, Section A, Table m-C-2, pae 6 of 16

• Response to CommentsPage 5 of 8Permit No. NJ0025411

Comment 10: The Quantification Limit of 20 micrograms per liter for Ammonia Nitrogen (as N) is notachievable using approved analytical methodologies by the New Jersey Certified Laboratories contacted.The Department has recognized the challenge of meeting the Recommended Quantitation Levels(hereafter "RQLs") at the Fact Sheet, Section 8.E., page 14 of 28 in stating that "the quantitation levelslisted therein can be reliably and consistently achieved by most state certified laboratories for most of thepollutants" (emphasis added). Ammonia Nitrogen appears to be one of the exceptions. The DelawareEstuary in the vicinity of the Station has a background ammonia nitrogen concentration of approximatelyfive to ten times the proposed RQL. PSEG recommends the RQL for Ammonia Nitrogen be changed to100 micrograms per liter. Additionally, PSEG requests clarification that the term RecommendedQuantitation Level as used in this section has the same meaning as the term Quantification Limit as usedin Part III of the Permit, or the Department provide a description of the difference and how these wouldbe applied.

Response 10: The Department agrees that inclusion of the RQL of 20 ug/L was made in error in thissection which pertains to the Wastewater Characterization Requirements for DSN 461C. TheDepartment has deleted the RQL for DSN 461C in this final permit action and has not specified an RQLfor ammonia.

For purposes of clarification, the term "quantification.limit", as used on page 14 of 28 of the Fact Sheet,is used interchangeably with the term "recommended. quantitation level" as used on page 6 of 16 of Pai-tIII as well as in other areas of the permit.

Permit, Part III, Section A, Table IMI-D-1, page 7 of 16

Comment 11: As discussed above (see comments regarding Fact Sheet, Section 8.B., page 13 of 29),PSEG believes imposition of these new BOD 5 limitations are not appropriate for this discharge.

Response 11: Please refer to Response 5.

Permit, Part m, Section A, Table IIl-D-1, page 8 of 16

Comment 12: As discussed above (see comments regarding Fact Sheet, Section-8.b., page 13 of 28),PSEG believes imposition of this new TSS limitation is not appropriate for this discharge.

Response 12: Please refer to Response 6.

Permit, Part IV, Section E.l.e, page 3 of 12

Comment 13: PSEG believes the parenthetical limitation following the authorization to utilize sodiumhypochlorite is inappropriate. The parenthetical limits sodium hypochlorite usage by stating "althoughnot in excess of two hours per day". Sodium hypochlorite is normally continuously added to thesystems. PSEG is limited to discharging chlorine produced oxidants to two hours per day from theaddition of sodium hypochlorite and meets this requirement by dechlorinating the effluent of the coolingtower blowdown using ammonium bisulfite before discharge. This limitation is contained in Part IV,Section G. 1. PSEG request deletion of the parenthetical following the words "sodium hypochlorite".

Response 13: The Department has reviewed the condition in Section E. 1.e. and agrees that theparenthetical reference to "although not in excess of two hours per day" is unnecessary given the

Response to CommentsPage 6 of 8Permit No. NJ002541 1

referenced in this same condition to item G. 1. This parenthetical phrase has been deleted in the finalpermit action. This change affects item E.i.e, page 3 of 12 in Part IV.

Clarification to Final Permit Initiated by the Department

Item 9.b., Part LV

Please note that as per a request from the Delaware River Basin Commission, the Department hasslightly modified the language in item 9.b. of Part IV in this final permit action where this languagepertains to the applicable DRBC document.

Conditions Related to Part IV, Section Stormwater

Permit effluent limitations, non-numeric effluent limitations, monitoring requirements, BestManagement Practices (BMPs) and other conditions are authorized by the Federal Water PollutionControl Act (33 U.S.C. 1251 et secq.), and the New Jersey State Water Pollution Control Act (N.J.S.A.58:10A-1 et s.). These statutes are implemented by the National Pollutant Discharge EliminationSystem (NJPDES) (40 CFR. 122) and the New Jersey Pollutant Discharge Elimination System (NJPDES)(N.J.A.C. 7:14A) permit program.

Concerning the permit renewal, the NJDEP is authorized under the federal regulations (40 CFR 122.4)and under NJPDES rules (N.J.A.C. 7:14A-6.2(b)) to impose BMPs to control and abate the discharge ofpollutants. The NIDEP may impose BMPs when BMPs are reasonably necessary to achieve effluentlimitations and standards to carry out the purposes and intent of the State and Federal Acts.Additionally, the NJDEP believes that it is not feasible at this time to establish water quality basedeffluent limits (WQBEL) for this stormwater discharge. The proposed limitations incorporated in theSPPP are consistent with the NJDEP's and USEPA's Stormwater permitting philosophy of reducing theamount of pollution created and to prevent pollution from occurring in the first place (see 24 N.J.R2352).

The primary method used in NJPDES Stormwater Permits, since the formation of the Stormwater PermitProgram, has been the Stormwater Pollution Prevention Plan (SPPP). Since the inception of NJDEP'sStormwater Permit Program the approach to the abatement of pollutants in stormwater has focused onpollution prevention rather than end of pipe treatment. The SPPP requirements and monitoringrequirements operate as limitations and control on stormwater effluent discharges to prevent stormwatercontamination and are intended to achieve Best Available Technology Economically Achievable (BAT)and Best Conventional Pollutant Control Technology (BCT). The SPPP focuses on several areas of.control, such as inventory, mapping, inspections, schedules and very importantly Best ManagementPractices (BMPs).

The BMPs incorporated in any facility's SPPP are the primary mechanism used in stormwatermanagement to eliminate the discharge of pollutants into the State's receiving waters. It has been theposition of the NJDEP that in the circumstance when the elimination of contact with source material isnot an economically viable option for a facility the NJDEP may require the reduction of the pollutantload using BMPs. This is done through an individual facility permit and would also include adetermination that the receiving water quality is not being adversely impacted. This difference betweenthe elimination of pollutants and the reduction of pollutants entering a facility's stormwater runoff is howthe NJDEP approaches permitting a facility.

Response to CommentsPage 7 of 8Permit No. NJ0025411

The State's Basic Industrial Stormwater Discharge General Permit ("the General Permit" NJ00883 15)regulates a facility towards achieving the goal of eliminating contact of source material with stormwaterrunoff, which has been informally referred to as the "no exposure" requirement. The belief being thatthe greatest environmental benefit would be derived from the complete elimination of exposure of sourcematerial. Therefore, the NJDEP Stormwater Permitting Program has structured permits, which areavailable to the regulated community, with an incentive to apply for the General Permit by havingreduced fees and administrative costs, and by eliminating requirements for monitoring/sampling. Thereason behind eliminating monitoring in the general permit goes to the premise that if you eliminate thesource you eliminate the need to monitor.

Those facilities for various economic reasons who can not comply with the "no exposure" performancestandard in the general permit must apply for an individual permit. Individual permits require samplingand monitoring. The main purpose for including sampling and monitoring requirements in an individualstormwater permit is to verify that BMPs are effective in controlling and abating pollutants in thefacility's stormwater runoff, and to evaluate whether the discharge is negatively impacting the receivingwater.

After review of the facility's SPPP and prior to drafting today's final permit NJDEP contacted thePermittee, PSEG Nuclear LLC ("PSEG"), regarding the option of applying for an authorization under theGeneral Permit. PSEG declined to apply for the General Permit Authorization and requested thatstormwater continue to be permitted under its individual permit. Based on PSEG's request NJDEPconcluded that the Hope Creek facility still has exposed source material that contacts its stormwaterrunoff and therefore must be regulated based on the policies outlined above. This would includesampling and monitoring of its stormwater discharge, which is why this was included in the proposedpermit.

PSEG, has commented that,

"The Department reviewed the stormwater study in the October 31, 1996 Draft NJPDES Permit FactSheet ("1996 Fact Sheet") and stated that the "stormwater study demonstrated that representativemonitoring of stormwater could not be achieved with the existing conveyance system elevations due totidal intrusion in the system by Delaware River water" (1996 Fact Sheet, Page 65 of 86). The Departmentfurther determined that modifications to the existing conveyance system elevations were not practical(1996 Fact Sheet, page 65 of 86)."

This statement made in the 1996 Fact Sheet was a summary of the conclusions made by PSEG in itsstormwater study dated July 13, 1990 and did not represent the opinion of the NJDEP. The opinionsexpressed by NJDEP regarding the stormwater study and the implementation of capital projects by PSEGactually began with the final paragraph of page 66 of 86 Pages and stated,

"As a result of the implementation of the capital projects and the BMP required under the ACO, theaverage TSS values reported on Hope Creek Generating Station's DMRs since 1992 have consistentlybeen lower than the values reported prior to the installation of the capital projects and the BMP. TheNJDEP's Bureau of Stormwater Permitting and the Bureau of Standard Permitting have inspected thesite and have determined that the continued use of BMPs instead of numeric limits is the mostappropriate means of regulating the discharge of pollutants from this site in stormwater runoff' (Page 67of 86 Pages)."

Response to CommentsPage 8 of 8Permit No. NJ002541I

It is the NJDEP's position that the DMR data was representative since the decision to remove thenumeric limitations was in part based on the evaluation of the performance of the BMPs using the DMRdata as stated in the aforementioned paragraph. As indicated by PSEG, the NJDEP did replace thenumeric effluent limitations and monitoring conditions in the existing permit for the stormwater outfallswith BMPs and Page 67 of 86 of the fact sheet stated this;

"The Department finds that the continuance of the numeric effluent limitations and monitoringconditions is unwarranted and infeasible based on the following: 1) the tidal intrusion of the DelawareRiver into the stormwater conveyance system reported in the stormwater study submitted by thepermittee in 1990; and 2) the material and substantial changes at the facility implemented between 1989and 1992 through its capital improvement projects and implementation of the BMPs such asminimization and elimination of contact of source materials with stormwater runoff.."

As PSEG noted in its comments, this paragraph does state and confirm PSEG's conclusion that thenumeric limitations are unwarranted and infeasible based in part on the tidal intrusion of the DelawareRiver in the stormwater conveyance system. However, it does not specifically identify representativ'esampling as the basis for it being unwarranted and infeasible. The statement does not go into detail as tohow the writer arrived at this decision. Notwithstanding, the NJDEP's position is that the samplescollected must have been representative if the numeric limitations were in part removed and replacedwith BMPs using DMR data. In retrospect the NJDEP believes that the statement should have beendocumented further. In addition, due to the capital project instituted at the facility, which resulted inchanges in the management of stormwater runoff, new representative sample locations and continuousmonitoring could have been included in the 1997 final permit, as per the January 11, 1990Administrative Consent Order (ACO) that states in paragraph 23:

"PSE&G shall develop and implement a Best Management Practices Plan ('BMPP") to control thedischarge of suspended solids in stormwater runoff from the site and a plan of study ("the -Study") todetermine the most feasible method by which representative monitoring of stormwater outfalls 462A,463A and 464 may be performed to account for all applicable sources of stormwater originating from thesite in accordance with the enforcement compliance schedule in paragraph twenty -five (25)."

Additionally, the Draft Fact Sheet noticed on November 19, 2002, did state that the stormwater drainagesystems may contain Delaware River water. In consideration of the above mentioned facts, and basedon the comments received by PSEG, NJDEP is renewing today's permit with the stormwaterrequirements contained in the 1997 final permit. The NJDEP will re-evaluate the information submittedby PSEG regarding the intrusion of water from the Delaware River and representative sampling of theconveyance system; and will inspect the site with PSEG to specifically identify new representativesample locations for the stormwater discharge from the areas of industrial activity. The permit will thenbe modified to include the appropriate sampling and monitoring requirements used for individual permitsto verify the performance of the BMPs based on the current NJDEP policies outlined-in the statementsabove.

)

-Nd.esy epimn ci En. VSriii~a Pr S -i

.--. W JERSEY POLLUTANT

S SCoARGE ELI MINA10Cr5 IE5I

The New Jersey Department of Environmental Protection hereby grants you a NJPDES permit for the facility/activity named in this document. Thispermit is the regulatory mechanism used by the Department to help ensure your discharge will not harm the environment. By complying with the termsand conditions specified, you are assuming an important role in protecting New Jersey's valuable water resources. Your acceptance of this permit is anagreement to conform with all of its provisions when constructing, installing, modifying, or operating any facility for the collection, treatment, ordischarge of pollutants to waters of the state. If you have any questions about this document, please feel free to contact the Department representativelisted in the permit cover letter. Your cooperation in helping us protect and safeguard our state's environment is appreciated.

Permit Number: NJ0025411

Final: Consolidated Renewal Permit Action

Permittee:PSEG NUCLEAR LLCPO BOX 23ALLOWAY CREEK NECK ROADHANCOCKS BRIDGE, NJ 08038

Property Owner:. PUBLIC SERVICE ELECTRIC & GAS COMPANY80 PARK PLAZAPO BOX 570NEWARK, NJ 07101

Co-Permittee:

Location Of Activity:HOPE CREEK GENERATING STATIONARTIFICIAL ISLANDFOOT OF BUTTONWOOD RDLOWER ALLOWAYS CREEK, SALEMCOUNTY, NJ 08038-0000

Authorization(s) Covered Under This Approval Issuance Date Effective Date Expiration DateB -Industrial Wastewater 12/31/2002 3/1/2003 2/31/2008RF -Stormwater

7-

By Authority of:Commissioner's Office DEP AUTHORIZATION

Pilar PattersonBureau of Point Source Permitting -Region 2Division of Water Quality

(Terms, conditions and provisions attached hereto)

:7 .i on -

HOPE CREEK GENERATING STATIONLower Alloways Creek

Permit No. NJ002541 1Discharge to Surface Water

Surface Water Renewal Permit Action

PART IGENERAL REQUIREMENTS:

NJPDES

A. General Requirements of all NJPDES Permits

1. Requirements Incorporated by Reference

a. The permittee shall comply with all conditions set forth in this permit and with all the applicablerequirements incorporated into this permit by reference. The permittee is required to comply withthe regulations, including those cited in paragraphs b. through e. following, which are in effect as ofthe effective date of the final permit.

b. General Conditions

Penalties for ViolationsIncorporation by ReferenceToxic PollutantsDuty to ComplyDuty to MitigateInspection and EntryEnforcement ActionDuty to ReapplySignatory Requirements for Applications and ReportsEffect of Permit/Other LawsSeverabilityAdministrative Continuation of PermitsPermit ActionsReopener ClausePermit Duration and RenewalConsolidation of Permit ProcessConfidentialityFee ScheduleTreatment Works Approval

c. Operation And Maintenance

Need to Halt or Reduce not a DefenseProper Operation and Maintenance

d. Monitoring And Records

MonitoringRecordkeepingSignatory Requirements for Monitoring Reports

e. Reporting Requirements

Planned ChangesReporting of Monitoring ResultsNoncompliance Reporting

Hotline/Two Hour & Twenty-four Hour ReportingWritten Reporting

Duty to Provide InformationSchedules of ComplianceTransfer

N.J.A.C. 7:14-8.1 et seg.N.J.A.C. 7:14A-2.3N.J.A.C. 7:14A-6.2(a)4iN.J.A.C. 7:14A-6.2(a)l & 4N.J.A.C. 7:14A-6.2(a)5 & 11N.J.A.C. 7:14A-2.1 l(e)N.J.A.C. 7:14A-2.9N.J.A.C. 7:14A-4.2(e)3N.J.A.C 7:14A-4.9N.J.A.C. 7:14A-6.2(a)6 & 7 & 2.9(c)N.J.A.C. 7:14A-2.2N.J.A.C. 7:14A-2.8N.J.A.C. 7: 14A-2.7(c)N.J.A.C. 7:14A-6.2(a) 10N.J.A.C. 7:14A-2.7(a) & (b)N.J.A.C. 7:14A-15.5N.J.A.C. 7:14A-18.2 & 2.11 (g)N.J.A.C. 7:14A-3.1N.J.A.C. 7:14A-22 & 23

N.J.A.C. 7:14A-2.9(b)N.J.A.C. 7:14A-6.12

N.J.A.C. 7:14A-6.5N.J.A.C. 7:14A-6.6N.J.A.C. 7:14A-6.9

N.J.A.C. 7:14A-6.7N.J.A.C. 7:14A-6.8N.J.A.C. 7:14A-6.10 & 6.8(h)N.J.A.C. 7:14A-6.I0(c) & (d)N.J.A.C. 7:14A-6.1O(e) &(f) & 6.8(h)N.J.A.C. 7:14A-2.11, 6.2(a)14 & 18.1N.J.A.C. 7:14A-6.4N.J.A.C. 7:14A-6.2(a)8 & 16.2

GENERAL REQUIREMENTS Page I of 1

HOPE CREEK GENERATING STATION, Lower Alloways Creek Permit No.NJ0025411PER020001 Consolidated Renewal Permit Action

PART II

GENERAL REQUIREMENTS:DISCHARGE CATEGORIES

A. Additional Requirements Incorporated By Reference

1. Requirements for Discharges to Surface Waters

a. In addition to conditions in Part I of this permit, the conditions in this section are applicable toactivities at the permitted location and are incorporated by reference. The permittee is required tocomply with the regulations which are in effect as of the effective date of the final permit.

i. Surface Water Quality Standards N.J.A.C. 7:9B-I

ii. Water Quality Management Planning Regulations N.J.A.C. 7:15

B. General Conditions

1. Scope

a. The issuance of this permit shall not be considered as a waiver of any applicable federal, state, andlocal rules, regulations and ordinances.

2., Permit Renewal Requirement

a. Permit conditions remain in effect and enforceable until and unless the permit is modified,renewed or revoked by the Department.

b. Submit a complete permit renewal application: 180 days before the Expiration Date.

3. Notification of Non-Compliance

a. The permittee shall notify the Department of all non-compliance when required in accordancewith N.J.A.C. 7:14A-6.10 by contacting the DEP HOTLINE at 1-877-WARNDEP(1-877-927-6337).

b. The permittee shall submit a written report as required by N.J.A.C. 7:14A-6.10 within five days.

4. Notification of Changes

a. The permittee shall give, written notification to the Department of any planned physical oroperational alterations or additions to the. permitted facility when the alteration is expected toresult in a significant change in the permittee's discharge and/or residuals use or disposal practicesincluding the cessation of discharge in accordance with N.J.A.C. 7:14A-6.7.

b. Prior to any change in ownership, the current permittee shall comply with the requirements ofN.J.A.C. 7:14A-16.2, pertaining to the notification of change in ownership.

5. Access to Information

a. The permittee shall allow an authorized representative of the Department, upon the presentation ofcredentials, to enter upon a person's premises, for purposes of inspection, and to access / copy anyrecords that must be kept under the conditions of this permit.

6. Operator Certification

* deneral Discharge Requirements Page 1 of 3

HOPE CREEK GENERATING STATION, Lower Alloways Creek Permit No.NJ0025411PER020001 Consolidated Renewal Permit Action'

a. Pursuant to N.J.A.C. 7:10A-1.1 et seq. every wastewater system not exempt pursuant to N.J.A.C. 07:10A-1.10(b) requires a licensed operator. The operator of a system shall meet the Department'srequirements pursuant to N.J.A.C. 7:10A-1. 1 and any amendments. The name of the proposedoperator, where required shall be submitted to the Department at the address below, in order thathis/her qualifications may be determined prior to initiating operation of the treatment works.

i. Notifcations shall be submitted to:NJDEPExamination and Licensing UnitP.O. Box 417Trenton, New Jersey 08625(609)777-1012

b. The permittee shall notify the Department of any changes in licensed operator within two weeksof the change.

7. Operation Restrictions

a. The operation of a waste treatment or disposal facility shall at no time create: (a) a discharge,except as authorized by the Departmefit in the manner and location specified in Part III of thispermit; (b) any discharge to the waters of the state or any standing or ponded condtion for wateror waste, except as specifically authorized by a valid NJPDES permit.

8. Residuals Management

a. The permittee shall comply with land-based sludge management criteria and shall conform withthe requirements for the management of residuals and grit and screenings under N.J.A.C.7:14A-6.15(a), which includes:

i. Standards for the Use or Disposal of Residual, N.J.A.C. 7:14A-20;

ii. Section 405 of the Federal Act governing the disposal of sludge from treatment works treatingdomestic sewage;

iii. The Solid Waste Management Act, N.J.S.A. 13:1E-1 et seq., and the Solid Waste ManagementRules, N.J.A.C. 7:26;

iv. The Sludge Quality Assurance Regulations, N.J.A.C. 7:14C;

v. The Statewide Sludge Management Plan promulgated pursuant to the Water Quality PlanningAct, N.J.S.A. 58:1 1A-1 et seq., and the Solid Waste Management Act, N.J.S.A. 13: 1E-1 et seq.;and

vi. The provisions concerning disposal of sewage sludge and septage in sanitary landfills set forth atN.J.S.A. 13:1E-42 and the Statewide Sludge Management Plan.

I

vii. Residual that is disposed in a municipal solid waste landfill unit shall meet the requirements in40 CFR Part 258 and/or N.J.A.C. 7:26 concerning the quality of residual disposed in a municipalsolid waste landfill unit. (That is, passes the Toxicity Characteristic Leaching Procedure anddoes not contain "free liquids" as defined at N.J.A.C. 7:14A-1.2.)

b. If any applicable standard for residual use or disposal is promulgated under section 405(d)of theFederal Act and Sections 4 and 6 of the State Act and that standard is more stringent than anylimitation on the pollutant or practice in the permit, the Department may modify or revoke andreissue the permit to conform to the standard for residual use or disposal.

General Discharge Requirements Page 2 of 3

HOPE CREEK GENERATING STATION, Lower Alloways Creek Permit No.NJ0025411PER020001 Consolidated Renewal Permit Action

Wc. The permittee shall make provisions for storage, or some other approved alternative managementstrategy, for anticipated downtimes at a primary residual management alternative. The permitteeshall not be permitted to store residual beyond the capacity of the structural treatment and storagecomponents of the treatment works. N.J.A.C. 7:14A-20.8(a) and N.J.A.C. 7:26 provide for thetemporary storage of residuals for periods not exceeding six months, provided such storage doesnot cause pollutants to enter surface or ground waters of the State. The storage of residual formore than six months is not authorized under this permit. However, this prohibition does notapply to residual that remains on the land for longer than six months when the person whoprepares the residual demonstrates that the land on which the residual remains is not a surfacedisposal site or landfill. The demonstration shall explain why residual must remain on the land forlonger than six months prior to final use or disposal, discuss the approximate time period duringwhich the residual shall be used or disposed and provide documentation of ultimate residualmanagement arrangements. Said demonstration shall be in writing, be kept on file by the personwho prepares residual, and submitted to the Department upon request.

d. The permittee shall comply with the appropriate adopted District Solid Waste or SludgeManagement Plan (which by definition in N.J.A.C. 7:14A-1.2 includes Generator SludgeManagement Plans), unless otherwise specifically exempted by the Department.

e. The preparer must notify and provide information necessary to comply with the N.J.A.C.7:14A-20 land application requirements to the person who applies bulk residual to the land. Thisshall include, but not be limited to, the applicable recordkeeping requirements and certificationstatements of 40 CFR 503.17 as referenced at N.J.A.C 7:14A-20.7(j).

f. The preparer who provides biosolids to another person who further prepares the biosolids forapplication to the land must provide this person with notification and information necessary tocomply with the N.J.A.C. 7:14A-20 land application requirements.

g. Any person who prepares bulk residual in New Jersey that is applied to land in a State other thanNew Jersey shall comply with the requirement at N.J.A.C. 7:14A-20.7(b) l.ix and/or 20.7(b)l.x, asapplicable, to provide written notice to the Department and to the permitting authority for theState in which the bulk residual is proposed to be applied.

O General Discharge Requirements Page 3 of 3

HOPE CREEK ( RATING STATION, Lower Alloways Creek

PART IIILIMITS AND MONITORING REQUIREMENTS

A. STORMWATER DISCHARGE

Monitored Location Group Members463A Stormwater, 464A Stormwater, 465A Stormwater

Consolidated DMR Reporting Requirements:Submit a Semi-Annual DMR: within twenty-five days after the end of every 6 month monitoring period beginning from the effective date of thepermit (EDP).

TatIe III - A - 1" Consolidated DMR Limits and Monitoring Requirements

Pe ). NJ0025411PER020001 Consolidated Re. ., Permit Action

Limits And Requirements0 Page. 1 0( 16

HOPE CREEK 'ATING STATION, Lower Alloways Greek 8•,. NJ00254- 1PER020001 Consolidated RO . Permit Acion

B. 461A DSN 461A - DSW

Location Description

Samples shall be collected at a point after combination with all wastewater components and after dechlorination but prior to discharge to the Delaware River. DSN 461A is located atlatitude 39 degrees, 28', 14" and long. 75 degrees 32' 34". DSN 461A discharges to Zone 5 of the Delaware River. The initial period is effective from the effective date of the permit(EDP) to EDP + 1 year whereas the final period becomes effective on EDIP + I year. The permittee shall install a continuous sampler for CPO by EDP + I year.Discharge CategoriesIndustrial Wastewater

Surface Water DMR Reporting Requirements:Submit a Monthly DMR: within twenty-five days after the end of every month beginning from the effective date of the permit (EDP).

Table 11I - B - 1: Surface Water DMR Limits and Monitoring Requirements

Parameter Sample Limit Statistical Sampling Sample Monitoring - Phase QuantificationPoint Base Frequency Type Period LimitFlow, In Conduit or Effluent REPORTI Monthly Continuous Metered January thru December FinalThru Treatment Plant Gross Value MGD AverageFlow, In Conduit or Effluent REPORT Daily Continuous Metered January thru December FinalThru Treatment Plant Gross Value MGD Maximnum

Flow, In Conduit or Intake From REPORT Monthly Continuous Metered January thru December FinalTlhu Treatment Plant Stream MGD AverageFlow, In Conduit or Intake From REPORT Daily Continuous Metered January thru December FinalThru Treatment Plant Stream MGD MaximumPH Effluent 6.0 Daily I / Week Grab January thru December FinalGross Value SU Minimium

pH Effluent 9.0 Daily I / Week Grab January thru December FinalGross Value SU MaximumChlorine Produced Effluent 0.2 Monthly Continuous Grab January thru December Final 0.1Oxidants. Gross Value MG/L Average Rec Quant LevelChlorine Produced Effluent 0.5 Daily Continuous Grab January thru December Final 0.1Oxidants Gross Value MG/L Maximum I I Rec Quant LevelTemperature, Effluent REPORT Monthly Continuous Metered January thru December FinalpC Gross Value DEG.C AverageTemperature, Effluent 36.2 Daily Continuous Metered January thru December FinaloC Gross Value DEG.C MaximumnTemperature, Intake From REPORT Monthly Continuous Metered January thru December FinaloC Stream DEG.C AverageTemperature, Intake From REPORT Daily Continuous Metered January thru December finaloC Stream DEG.C Maximum [Carbon, Tot Organic Effluent RI-PORT Monthly I / Month " Grab January [ru December Final(TOC) I Gross Value MG/lI Average [ I I I I

Limits And Monitoring RequirementsPage 2 of 16

HOPE CREEK C RATING STATION, Lower Alloways CreekPe )-NJoo2s4'1

PEPR02V30A C Y~ohdaed Re. -Permit Ac~ion

Table III - B - 1: Surface Water DMR Limits and Monitoring Requirements

Parameter Sample Limit Statistical Sampling Sample Monitoring iPhase Quantification

Point Base Frequency Type Period LimitCarbon, Tot Organic Effluent REPORT Daily I / Month Grab January thru December Final(TOC) Gross Value MG/L Maximum _Carbon, Tot Organic Effluent Net REPORT Monthly I I/ Month Calculated January thri December Final(TOC) Value MG/L Average •Carbon, Tot Organic Effluent Net REPORT Daily 1 / Month Calculated January thru December Final(TOC) Value MG/L MaximumCarbon, Tot Organic Intake From REPORT Monthly I / Month Grab January thru December Final(TOC) Stream MG/L AverageCarbon, Tot Organic Intake From REPORT Daily I / Month Grab January thru December Final(TOC) Stream MG/L MaximumHeat (summer) Effluent REPORT Monthly I / Day Calculated June thru August Final(per Hr.) Gross Value MBTU/HR AverageHeat (summer) Effluent 534 Daily I / Day Calculated June thru August Final(per Hr.) Gross Value MBTU/HR MaximumHeat (winter) Effluent REPORT Monthly 1/ Day Calculated September thru May Final(per Hr.) J Gross Value MBTU/HR AverageHeat (winter) Effluent 662 Daily I / Day Calculated' September thru May Final(per Hr.) Gross Value MBTU/I-IR MaximumFlow, In Conduit or Effluent REPORT Monthly Continuous Metered January thru December InitialThru Treatment Plant JGross Value MGD AverageFlow, In Conduit or - Effluent REPORT Daily Continuous Metered January thru December InitialThru Treatment Plant Gross Value MGD Maximum

pH-I Effluent 6.0 1 Daily 1 / Week Grab January thru December InitialGross Value SU Minimum

P1-I IEffluent 9.0 1 Daily 1/ Week Grab January thru December InitialGross Value SU MaximumChlorine Produced Effluent 0.2 Monthly 3 / Week Grab January thru December Initial 0.1Oxidants Gross Value MG/L Average

Rec Quant LevelChlorine Produced Effluent 0 0.5 Daily 3 / Week Grab January thru December Initial 0.1Oxidants Gross Value MG/L Maximum IntaRec Quant LevljTemperature, Effluent REPORT Monthly Continuous Metered January thru December InitialoC Gross Value DEG.C Average I ITemperature, Effluent 36.2 Daily Continuous Metered January thru December InitialoC Gross Value DEG.C MaximumTemperature, Intake From REPORT Monthly Continuous Metered January Ihru December InitialoC Stream DEG.C Average I ITemperature, I Intake From REPORT Daily I Continuous Metered January lhrU December Initial j/oC Stream DEG.C Maximum I

Limits And M Requirements49 Page 3 of 16

PE 0 NJ00254iPER020001 Consolidated ReoBr.dermit Act,,on

HOPE CREEK I A1TING STATION, Lower Alloways Creek

Table II - B - I: Surface Water DMR Limits and Monitoring Requirements

Parameter Sample Limit Statistical Sampling Sample Monitoring Phase QuantificationPoint I _ _ Base Frequency Type Period LimitCarbon, Tot Organic Effluent REPORT Monthly I / Month Grab January thru December Initial(TOC) Gross Value MG/L AverageCarbon, Tot Organic Effluent REPORT Daily I / Month Grab January thru December Initial(TOC) Gross Value MG/L MaximumCarbon, Tot Organic Effluent Net REPORT Monthly I / Month Calculated January thru December Initial(TOC) Value MG/L AverageCarbon, Tot Organic EffluentNet REPORT Daily I / Month . Calculated January thru December Initial(TOC) Value MG/L Maximum ICarbon, Tot Organic Intake From REPORT Monthly I / Month Grab January thru December Initial(TOC) Stream MG/L Average I ICarbon, Tot Organic Intake From REPORT Daily I / Month Grab January thru December Initial(TOC) Stream MG/L MaximumHeat (summer) Effluent REPORT Monthly I /Day Calculated June thru August Initial(per Hr.) Gross Value M13TU/HR AverageHeat (summer) Effluent 534 Daily I / Day Calculated June thru August Initial(per Hr.) Gross Value MBTU/I-IR MaximumHeat (winter) Effluent REPORT Monthly I / Day Calculated " September thru May Initial(per Hr.) Gross Value MI3TU/HR AverageHeat (winter) Effluent 662 Daily I / Day Calculated September thru May Initial(per Fir.) Gross Value MI3TU/HR Maximum

Limits And Monitoring Requirements

Page 4 of 16

I%,r - .. ~Z4 a 3~l.~l -IM'3 0 f JN UwCIl milWdyb lýAter'Permit No. NMJ025411

PER020001 Consolidated Renev trait Action

C. 461C DSN 461C - DSW INTERNAL

Location Description

Samples for this internal monitoring point shall be collected after all treatment has been performed and prior to mixing with cooling tower blowdown. This internal discharge pointdischarges through DSN 461A where DSN 461A discharges at latitude 39 degrees, 28', 14" and long. 75 degrees32' 34".

Discharge CategoriesIndustrial Wastcwater

Surface Water DMR Reporting Requirements:Submit a Monthly DMR: within twenty-five days after the end of every month beginning fromn the effective date of the permit (EDP).

Table 11I - C - 1: Surface Water DMR Limits and Monitoring Requirements

Parameter Sample Limit Statistical Sampling Sample Monitoring Phase QuantificationPoint Base Frequency Type Period Limit

Flow, In Conduit or Effluent REPORT Monthly Continuous Metered January thru December FinalThru Treatment Plant Gross Value j MGD Average

Flow, In Conduit or Effluent REPORT Daily Continuous Metered January thru December FinalThru Treatment Plant Gross Value MGD Maximum

Solids, Total Effluent 30 Monthly I / Month Composite January thru December FinalSuspended Gross Value MG/L Average I

Solids, Total Effluent 100 Daily I I Month Composite January thru December FinalSuspended Gross Value MG/L Maximum

Petrol Hydrocarbons, Effluent 10 Monthly 2 / Month Grab January thru December FinalTotal Recoverable Gross Value MG/L Average

Petrol Hydrocarbons, Effluent 15 Daily 2 / Month Grab January thru December FinalTotal Recoverable Gross Value MG/L Maximum

Carbon, Tot Organic Effluent REPORT Monthly I I Month Composite January thru December Final(TOC) Gross Value MG/L Average

Carbon, Tot Organic Effluent 50 Daily I / Month Composite January thru December Final(TOC) Gross Value MG/L Maximum

Limits And Monit ' quirements0 Page 5 of 16

HOPE CREEK GENERATING STATION. Lower Alloways Creek Pertift NJO025411PER020001 Consolidated RerfW .rmit Action

Surface Water WCR - Quarterly Reporting Requirements:Submit a Quarterly WCR: within twenty-five days after the end of every quarterly monitoring period beginning from the effective date of thepermit (EDP). A minimum of four samples shall be taken-during the period beginning with the effective date of the permit (EDP) until EDP + Iyear for DSN 461C. After EDP + I year, the Wastewater Characterization Requirement is no longer required for DSN 461C.

Table Ill - C - 2: Surface Water WCR - Quarterly Limits and Monitoring Requirements

Parameter Compliance Units Sample Monitoring Phase QuantificationQuantity Type Period Limit

Nitrogen, Ammonia REPORT I UG/L 24 I-lour Composite January thru December FinalTotal (as N)

Zinc, REPORT UG/L 24 Hour Composite January thru December Final 10Total Recoverable Rec Quant Level

Cadmium, REPORT UG/L 24 Hour Composite January thru December Final 4Total Recoverable Ree Quant Level

Copper, REPORT UG/L 24 Hour Composite January thru December IFinal 2Total Recoverable I Rec Quant Level

Limits And Monitoring Requirements Page 6 of 16

.1-1 1-1 -1 1- _ - I ' _ - -,vvy. -. CC Hermit No. NJUU2b411PER020001 Consolidated Rene, - 'rmit Action

D. 462B DSN 462B - DSW OUTFALL

Location Description

Samples obtained from this internal monitoring point shall be collected after all treatment has been performed and prior to mixing with cooling tower blowdown. This internaldischarge point discharges through DSN 461A where DSN 461A discharges at latitude 39 degrees, 28', 14" and long. 75 degrees 32' 34".

Discharge CategoriesIndustrial Wastewater

Surface Water DMR Reporting Requirements:Submit a Monthly DMR: Within twenty-five days after the end of every month beginning from the effective date of the permit (EDP)..

Table Ill - D - I: Surface Water DMR Limits and Monitoring Requirements

Parameter Sample Limit 1 -Statistical Sampling Sample Monitoring Phase Quantification

Point I Base Frequency Type Period LimitFIlow, In Conduit or Effluent REPORT Monthly I / Day Metered January thru December FinalThru Treatment Plant Gross Value MGD AverageFlow, In Conduit or Effluent REPORT Daily 1 /Day Metered January thru December FinalThru Treatment Plant Gross Value MGD MaximumBOD, 5-Day (20 oC) Raw REPORT Monthly I / Month Composite January thru December Final

Sew/influent MG/L AverageBOD, 5-Day (20 oC) Raw REPORT Daily I / Month Composite January thru December Final

Sew/influent MG/L MaximumBOD, 5-Day (20 oC) Effluent 8 Monthly 1 / Month Composite January thru December Final

Gross Value KG/DAY AverageBOD, 5-Day (20 oC) Effluent REPORT Weekly I / Month Composite January thru December Final

Gross Value '_KG/DAY AverageBOD, 5-Day (20 oC) Effluent 30 Monthly I / Month Composite January thru December Final

Gross Value MG/L AverageBOD, 5-Day (20 oC) Effluent 45 I Weekly I / Month Composite January thru December Final

Gross Value MG/L [ AverageBOD, 5-Day (20 oC) Percent 87.5 1 Daily- I / Month Calculated January thru December Final

Removal PERCENT M inimumBOD, 5-Day (20 oC) Percent REPORT Monthly I / Month Calculated January thru December Final

aRemoval PERCENT Average

Solids, Total Raw REPORT Monthly I / Month Composite January thru December FinalSuspended Sew/influent MG/L Average I I I

Solids, Total Raw REPORT Daily I / Month Composite January thru December FinalSuspended Sev/influent MG/L Maximum u DSolids, Total Effluent 30 Monthly I / Month Composite January thru December FinalSuspended Gross Value MG/L Average I I I I

mits And Mon'i'Requirements0 Page 7 of 16

HOPE CREEK@W AT ING STATION, Lower Ailoways Creel

P ). NJ00254;1PER020001 Consolidated R1 . Permit Action

Table Ill - D - 1: Surface Water DMR Limits and Monitoring Requirements

Parameter Sample Limit Statistical Sampling Sample Monitoring Phase QuantificationPoint Base Frequency Type Period Limit

Solids, Total Effluent •45 Weekly I ,/Month Composite •January thru December FinalSuspended Gross Value MG/L Average

Solids, Total Percent 85 Daily I / Month Calculated January thru December FinalSuspended Removal PERCENT Minimum

Solids, Total Percent REPORT Monthly 1 / Month Calculated January thru December FinalSuspended Removal PERCENT Average

Oil and Grease Effluent I 10 Monthly 1 / Month Grab January thru December FinalGross Value MG/L Average

Oil and Grease Effluent 15 Daily I / Month Grab January thru December Final

Gross Value MG/L Maximum

Coliform, Fecal Effluent 200 Monthly I / Month Grab January thru December FinalGeneral Gross Value #/100ML Geo Avg

Coliform, Fecal Effluent 400 Weekly I / Month Grab January thru December FinalGeneral Gross Value #/I00ML Geometric

Surface Water WCR - Quarterly Reporting Requirements:Submit a Quarterly WCR: within twenty-five days after the end of every quarterly monitoring period beginning from the effective date of thepermit (EDP). A minimum of four samples shall be taken during the period beginning with the effective date of the permit (EDP) until EDP + Iyear for DSN 462B. After EDP + 1 year, the Wastewater Characterization Requirement is no longer required for DSN 462B.

Table III - D - 2: Surface Water WCR - Quarterly Limits and Monitoring Requirements

Parameter Compliance Units Sample Monitoring Phase QuantificationQuantity Type Period Limit

Cyanide, Total REPORT UG/L Grab January thro December Final 40(as CN) Rec Quant Level

• Nickel, RETORT UG/L 24 Hour Composite January thru December Final 10Total Recoverable _1_Rec Quant LevelZinc, REPORT UG/L 24 Hour Comnposite January thru December Final 10Total Recoverable II Rec Quant LevelCadmium, REPORT UG/L 24 I-lour Composite January thru December Final 4Total Recoverable 2 Rec Quant Level

Chromium, REPORT UG/L 124 Hour Composite January thru December Final 10Total Recoverable I Rec Quatt Level

Copper, REPORT UG/L 24 H-lour Composite January thru December Final 2Total Recoverable I I I Rec Quant Level

Limits And Monitoring Requirements Page 8 of 16

HOPE CREEK ( ",ATING STATION, Lower Alloways CreekPet i NJ100254 1PERMU31G 0ansotidaked ¶Rei Permll Action

E. SI6A OIL/WATER SEPARATOR

Location Description

A representative sample of residuals generated by the Oil/Water Separator shall be analyzed pursuant to the Sludge Quality Assurance Regulations (SQAR, N.J.A.C. 7:14C).

Discharge CategoriesIndustrial Wastewater

Residuals DMR Reporting Requirements:Submit an Annual DMR: due 60 calendar days after the end of each calendar year.

Table III - E - 1: Residuals DMR Limits and Monitoring Requirements

Parameter Sample Limit Statistical Sampling Sample Monitoring Phase - QuantificationPoint Base Frequency Type Period LimitNitrate Nitrogen, Industrial REPORT Monthly I / Year Composite January thru December FinalDry Weight Residuals MG/KG Average .. .... .Nitrogen, Kjeldahl Industrial REPORT Monthly I / Year Composite January thru December FinalTotal, Dry Wt Residuals MG/KG AverageStyrene Industrial REPORT Monthly I / Year Composite. January thru December FinalResiduals MG/KG AverageNitrogen, Ammonia Industrial REPORT Monthly I / Year - Composite January thru December FinalDry Weight Residuals M G/KG AverageSulfide, Total Industrial REPORT Monthly 1 / Year Composite January thru December Final(as S) Residuals MG/KG AverageMagnesium Industrial REPORT Monthly I / Year Composite January thru December FinalDry Weight Residuals M G/KG Average I IBarium, Total Industrial REPORT Monthly I / Year Composite January thru December Final(as Ba) Residuals MG/KG AverageBoron, Total Industrial REPORT Monthly 1 / Year Composite January thru December Final(as B) Residuals MG/KG AverageManganese, Total Industrial REPORT Monthly I / Year Composite January thru December Final(as Mn) Residuals MG/KG AverageTitanium, Total Industrial REPORT Monthly I / Year Composite January thru December Final(as Ti) Residuals MG/KG AverageMolybdenum Industrial REPORT Monthly I / Year - Composite January thru December FinalDry Weight, Residuals MG/KG Average I I IPhosphorus Industrial REPORT Monthly I / Year Composite January thru December FinalDry Weight Residuals MG/KG Average IArsenic, Dry Weight Industrial REPORT Monthly I / Year Composite January thru December IFinalResiduals MG/KG Average I

Limits And Mo Requirements 0 Page 9 of 16

HOPE CREEK ',ATING STATION, Lower Altoways Creek F. NJ00254 11PER020001 Consolidated .... Permit Action

Table IlI - E - 1: Residuals DMR Limits and Monitoring Requirements

Parameter Sample Limit Statistical I Sampling Sample [ Monitoring Phase QnantificalionPoint Base Frequency Type Period j_ _Limit

Cobalt, Total Industrial REPORT Monthly I / Year Composite January thru December Final(as Co) Residuals MG/KG Average _

Silver, Dry Weight Industrial REPORT Monthly I / Year Composite January thru December FinalResiduals MG/KG Average

Antimony, Dry Weight Industrial REPORT Monthly I / Year Composite January thru December FinalResiduals j MG/KG Average

Aluminum, Total Industrial REPORT Monthly I / Year Composite January thru December Final(as Al) .Residuals MG/KG AverageISelenium, Dry Weight Industrial REPORT Monthly I / Year Composite. January thru December Final

Residuals MG/KG AverageCopper, Dry Weight Industrial REPORT Monthly I1 / Year Composite January thru December Final

Residuals MG/KG AverageCadmium, Dry Weight Industrial REPORT Monthly I / Year Composite January thru December Final

Residuals MG/KG AverageZinc, Dry Weight Industrial REPORT Monthly. I / Year Composite January thru December Final

Residuals MG/KG AverageLead, Dry Weight Industrial REPORT Monthly I / Year Composite" January thru December Final

Residuals MG/KG Average

Nickel, Dry Weight Industrial REPORT Monthly I / Year Composite January thru December FinalResiduals MG/KG Average

Mercury, Dry Weight Industrial REPORT Monthly I / Year Composite January thru December FinalResiduals. MG/KG Average

Chromium, Dry Weight Industrial REPORT Monthly '/Year Composite January thru December FinalResiduals MG/KG Average

Iron, Dry Weight Industrial REPORT Monthly I / Year Composite January thru December FinalResiduals MG/KG Average

Benzene, Dry Weight Industrial REPORT Monthly I / Year Composite January thru December FinalResiduals MG/KG Average

13is(2-chloroethyl) Industrial REPORT Monthly i / Year Composite January thru December Finalether, Dry Wt Residuals MG/KG AverageButyl benzyl- Industrial REPORT I Monthly I / Year Composite January thru December Finalphthalate, Dry Wt Residuals. MG/KG AverageDimethyl phthalate, Industrial REPORT Monthly I / Year Composite January thru December FinalDry Weight Residuals MG/KG AverageNaphthalene Industrial REPORT Monthly I / Year Composite January thru December FinalDry Weight Residuals MG/KG Average2-Chloronaphthalene, IeIndustrial IREPORTMI Monthly I / Year Composite January thru December FinalDry Weight 1.Residuals MG/KG Average I ____________ ____________ I _______________

Limits And Monitoring RequirementsPage 10 of 16

HOPE CREEK G "ATING STATION, Lower Alloways Creek Pe, ).NJ00254 •lPERO20001 Consolidated Re,. . Permit Action

Table fIt - E - 1: Residuals DMR Limits and Monitoring Requirements

Paaeer Sample Limit Statistical Sampling Sample Monitoring Phs QuantificationPoint Base Frequency Type Period Limit

Di-n-butyl phthalate Industrial REPORT Monthly I / Year Composite January thru December FinalDry Weight Residuals MG/KG AverageIHexachlorobenzene, Industrial REPORT Monthly I / Year Composite January thru December FinalDry Weight Residuals MG/KG AverageCarbon Tetrachloride Industrial REPORT Monthly I / Year Composite January thru December FinalDry Weight Residuals MG/KG AverageChlorobenzene, Industrial REPORT Monthly 1 / Year Composite January thru December FinalDry Weight Residuals MG/KG AverageChloroform Industrial REPORT Monthly I / Year Composite January thru December FinalDry Weight Residuals MG/KG AverageEthylbenzene Industrial REPORT Monthly I / Year Composite January thru December FinalDry Weight Residuals MG/KG Average

IMethylene Chloride, Industrial REPORT Monthly I / Year Composite January thru December FinalDry Weight Residuals MG/KG AverageTetrachloroethylene, Industrial REPORT Monthly I / Year Composite January thru December FinalDry Weight Residuals MG/KG AverageToluene, Dry Weight Industrial REPORT Monthly I / Year Composite* January thru December FinalResiduals MGiKG Aver-age

Trichloroethylene, Industrial REPORT Monthly I / Year Composite January thru December FinalDry Weight Residuals MG/KG Average I1,1,1 -Trichloro- Industrial REPORT Monthly I / Year Composite January thru December Finalethane, Dry Wt Residuals MG/KG AverageCarbon disulfide Industrial REPORT Monthly I / Year Composite January thru December FinalResiduals MG/KG AverageVinyl acetate Industrial REPORT Monthly I / Year Composite January thru December FinalResiduals MG/KG Average _

Xylene Industrial REPORT Monthly I / Year Composite January thru December FinalResiduals MG/KG. Average IAcetone Industrial REPORT Monthly I / Year Composite January thru December FinalResiduals M G/KG Average

Phenol, Single Industrial REPORT Monthly I / Year Composite January ihru December FinalCompound, Dry Wt jResiduals MG/KG Average2,4-D) Industrial

ResidualsREPORTMG/KG

MonthlyAverage

I / Year Composite January thru December Final

Limits And MoO Requirements0 Page I I of 16

HOPE CREEK JOATING STATION, Lower Alloways Creek 0 P * "NJ00254 1PER020001 Consolidated R - Permit Action

ReSiduals WCR - Monthly Reporting Requirements:Submit a Monthly WCR: due 60 calendar days after the end of each calendar month.

Table III - E - 2: Residuals WCR - Monthly Limits and Monitoring Requirements

Parameter r Compliance Units Sample Monitoring Phase Quantificationa Quantity

Type Period Limit

Sludge Landfilled REPORT DMT/MO Calculated January thru December Final[Sludge Land Applied REPORT DMT/MO Calculated January thru December Final

Sludge Disposed REPORT DMT/MO Calculated January thru December FinalOut-of-State

Amt Sludge Rmvd, REPORT WCY/MO Calculated January thru December FinalWet Cubic Yards

Amwt Sludge Rmvd, REPORT WMT/MO Calculated January thru December FinalWet Metric Tons

Amt Sludge Rmvd, REPORT GAL/MON Calculated January thru December FinalGallons

Sludge Bene Use REPORT DMT/MO Calculated January thru December FinalOut-of-State

Sludge Surface REPORT DMT/MO Calculated January thru December FinalDisposed

Total Amount of REPORT DMT/MO Calculated January thru December Final_Sludge Removed

Sludge Incinerated REPORT DMT/MO Calculated January thru December Final

Sludge Disposed- REPORT DMT/MO Calculated January thru December FinalOther Methods

Sludge/Septage Rcvd REPORT WMT/MO Calculated January thru December FinalOffsite Srces Wet MT ISludge/Septage Rcvd REPORT GAL/MON Calculated January thru December IFinalOffsite Srces Gals ISludge/Septage Rcvd REPORT WCY/MO Calculated January thru December FinalOffsite Srces Wt Yd3

Solids, Total REPORT %TS Composite January thrU December Final

Limits And Monitoring RequirementsPage 12 of 16

HOPE CREEK C ,ATING STATION, Lower Alloways CreekPe ).NJ0025411

PER020001 Consolidated Rer,.. Permit Actit)r

Residuals Transfer Reporting Requirements:Submit a Monthly RTR: due 60 calendar days after the end of each calendar month.

Limits And MID ) Requirements

0 Page 13 of 16

HOPE CREEK j*O ATING STATION, Lower Attoways Crek P* ). NJO0254 . 1PER020001 Consolidated Permit Ac•'ýn

F. SLIA STP SYSTEMLocation Description

A representative sample of residuals generated by the STP System shall be analyzed pursuant to the Sludge Quality Assurance Regulations (SQAR, N.J.A.C. 7:14C).

Discharge CategoriesIndustrial Wastewater

Residuals DMR Reporting Requirements:Submit an Annual DMR: clue 60 calendar days after the end of each calendar year.

Table III - F - 1: Residuals DMR Limits and Monitoring Requirements

Parameter Sample Limit Statistical Sampling Sample Monitoring Phase QuantificationPoin Base Frequency Type Period LimitSolids, Total Residuals REPORT Monthly I / Year Composite January thru December FinalI %TS Average -

Nitrate Nitrogen, Residuals REPORT Monthly I / Year Composite January thru December FinalDry Weight .. MG/KG AverageNitrogen, Kjeldahl Residuals REPORT Monthly I / Year Composite January thru December FinalTotal, Dry Wt MG/KG Average "Potassium Residuals REPORT Monthly I / Year Composite January thru December FinalDry Weight MG/KG Average j,Nitrogen, Ammonia Residuals REPORT Monthly I / Year Composite January thru December FinalDry Weight MG/KG AverageCalcium Residuals REPORT Monthly 1 /Year Composite January thru December FinalDry Weight MG/KG Average 1Molybdenum Residuals REPORT Monthly I / Year Composite January thru December FinalDry Weight - MG/KG AveragePhosphorus Residuals REPORT Monthly I / Year Composite January thru December FinalDry Weight MG/KG Average iArsenic, Dry Weight Residuals REPORT Monthly I / Year Composite January thru December rFinali MG/KG Average

Selenium, Dry Weight Residuals REPORT Monthly I /Year Composite January thru December Final_ M G/KG Average _ _ _ _Copper, Dry Weight Residuals REPORT Monthly I / Year Composite January thru December FinalSMG/KG AverageII

lBerylliunm Residuals REPORT Monthly I / Year Composite January thru December FinalDry Weight MG/KG Average .Cadmium, Dry Weight Residuals REPORT Monthly I / Year Composite I January thru December Final

D MG/KG Average I________ M/G J Aeae *_.___________I_______________________-__

_____________

Limits And Monitoring RequirementsPage 14 of 16

HOPE CREEK C 'ATING STATION. Lower Atloways Creek Pei i. NJ00254 :1PER020001 Consolidated Rer - Permit Act*:)n

Table 11I - F - 1: Residuals DMR Limits and Monitoring Requirements

Parameter Sample Limit Statistical Sampling Sample Monitoring Phase QuantificationPoint Base Frequency Type Period Limit

Zinc, Dry Weight Residuals REPORT Monthly I / Year Composite January thru December FinalIMG/KG Average 1-

Lead, Dry Weight Residuals REPORT Monthly I / Year Composite January thru December Final

i MG/KG AverageNickel, Dry Weight Residuals REPORT Monthly I /Year Composite January thru December Final

MG/KG Average

Mercury, Dry Weight Residuals REPORT Monthly 1 / Year Composite January thru December Final

I MG/KG Average I I IChromium, Dry Weight Residuals REPORT Monthly I / Year Composite January thru December FinalI W I MG/KG Average _ _ _

Limits And Moo Requirements0 Page 15 of 16

HOPE CREEKO@ATING STATION, Lower AlIoways Creek 0 SPNJe02541PERO20001 Consolidated Permit Action

Residuals WCR - Annual Reporting Requirements:Submit an Annual WCR: due 60 calendar days after the end of each calendar year.

Table III - F - 2: Residuals WCR - Annual Limits and Monitoring Requirements

Parameter Compliance Units [ Sample Monitoring Phase QuantificationQuantity[ Type Period LimitSludge Landfilled REPORT DMT/YR jCalculated January thru December Final

e Land Applied RDMT/YR Calculated January thru December Final

Sludge Disposed REPORT DMT/YR Calculated January thru December FinalOut-of-State

Amt Sludge Rmvd, REPORT WCY/YR Calculated January thru December FinalWet Cubic YardsAmt Sludge Rmvd, REPORT WMT/YR Calculated January thru December FinalWet Metric Tons

Amt Sludge Rmvd, REPORT GAL/YEAR Calculated January thru December FinalGallons

Sludge Bene Use REPORT DMT/YR Calculated January thru December FinalOut-of-StateSludge Surface REPORT DMT/YR Calculated January thru December FinalDisposed[ Total Amount of REPORT DMT/YR Calculated January thru December FinalSudge Removed ISludge Incinerated REPORT DMT/YR Calculated January thru December Final 4Sludge Disposed- REPORT DMT/YR Calculated January thru December FinalOther Methods ISolids, Total REPORT ] %TS - Composite January thru December Final

Residuals Transfer Reporting Requirements:Submit an Annual RTR: due 60 calendar days after the end of each calendar year.

Limits And Monitoring RequirementsPage 16 of 16

HOPE CREEK GENERATING STATION, LowerAlloways Creek Permit No.NJ0025411PER020001 Consolidated Renewal Permit ActionPART IV

SPECIFIC REQUIREMENTS: NARRATIVE

Industrial Wastewater

A. MONITORING REQUIREMENTS

1. Standard Monitoring Requirements

a. Each analysis required by this permit shall be performed by a New Jersey Certified Laboratorythat is certified to perform that analysis.

b. The Permittee shall perform all water/wastewater analyses in accordance with the analytical testprocedures specified in 40 CFR 136 unless other test procedures have been approved by theDepartment in writing or as otherwise specified in the permit.

c. The permittee shall utilize analytical methods that will ensure compliance with the QuantificationLevels (QLs) listed in PART III. If the permittee and/or contract laboratory determines that theQLs achieved for any pollutant(s) generally will not be as sensitive as the QLs specified in PARTIII, the permittee must submit a justification of such to the Bureau of Point Source PermittingRegion 2. Failure to submit a justification is a permit violation.

d. All sampling shall be conducted in accordance with the Department's Field Sampling ProceduresManual; or an alternate method approved by the Department in writing.

e. All monitoring shall be conducted as specified in Part III.

f. All sample frequencies expressed in Part III are minimum requirements. However, if additionalsamples are taken, analytical results shall be reported as appropriate.

g. The permittee shall perform all residual analyses in accordance with the analytical test proceduresspecified in 40 CFR 503.8 and the Sludge Quality Assurance Regulations (N.J.A.C. 7:14C) unlessother test procedures have been approved by the Department in writing or as otherwise specifiedin the permit.

h. Flow shall be measured using a flow meter at DSN's 46 IA, 461C and 462B.

i. The net amount of heat per unit time shall be calculated by multiplying heat capacity, dischargeflow, and discharge-intake temperature difference.

j. Net limitation shall be calculated by multiplying [(gross effluent concentration)*(gross effluentflow) - (intake concentration)*(intake flow)}/(gross effluent flow).

B. RECORDKEEPING

1. Standard Recordkeeping Requirements

a. The permittee shall retain records of all monitoring information including all calibration andmaintenance records, all original strip chart recordings for continuous monitoring instrumentation,copies of all reports, and all data used to complete the application for this permit.

b. Records of monitoring information shall include the date, locations and time of sampling ormeasurements, the individual who performed the sampling or measurements, the date the sampleswere collected, the date the samples were analyzed, the individual who performed the analysis, theanalytical method used, and the results.

c. The permittee shall retain copies of all reports required by a NJPDES permit and records of alldata used to complete the application for a NJPDES permit for a period of at least 5 years unlessotherwise required by 40 CFR Part 503.

Industrial Wastewater Page 1 of 13

HOPE CREEK GENERATING STATION, Lower Alloways Creek Permit No.NJ0025411PER020001 Consolidated Renewal Permit Action

d. The permit-tee shall allow an authorized representative of the Department, upon the presentation ofcredentials, to enter upon a person's premises, for purposes of inspection, and to access / copy anyrecords that must be kept under the conditions of this permit.

C. REPORTING

1. Standard Reporting Requirements

a. The permittee shall submit all required monitoring results to the DEP on the forms provided to thefollowing addresses:

i. NJDEPDivision of Water QualityBureau of Permit ManagementP.O. Box 029Trenton, New Jersey 08625

ii. DRBCP. 0. Box 7360West Trenton, New Jersey 08628

b. If requested by the Water Compliance and Enforcement Bureau, please send the informationrequested to the following address:

i. Southern Bureau of Water Compliance and EnforcementOne Port Center2 Riverside Drive, Suite 201Camden, NJ 08103.

c. For submittal of paper monitoring report forms:

i. All monitoring reports shall be signed by the highest ranking official having day-to-daymanagerial and operational responsibilities for the discharging facility in accordance withN.J.A.C. 7:14A-6.9.

ii. The highest ranking official may delegate responsibility to sign in accordance with NJAC7:14A-6.9(c).

d. Monitoring reports shall be completed in accordance with the current Discharge MonitoringReport Manual and any updates.

e. When quantification levels (QL) and effluent limits are both specified for a given parameter inPart III, and the QL is less stringent than the effluent limit, effluent compliance will be determinedby comparing the reported value against the QL.

f. If monitoring for a parameter is not required for that monitoring period, the permittee is requiredto report "CODE=N" on that Monitoring Report Form.

g. For intermittent discharges, the permittee shall obtain a sample during at least one of the dischargeevents occurring during a monitoring period. Place a check mark in the "No Discharge thisMonitoring Period" box on the monitoring report submittal form only if there are no dischargeevents during the entire monitoring period.

D. SUBMITTALSL. Standard Submittal Requirements

a. The permittee shall amend the Operation & Maintenance Manual whenever there is a change inthe treatment works design, construction, operations or maintenance which substantially changesthe treatment works operations and maintenance procedures.

E. FACILITY MANAGEMENT

Industrial Wastewater Page 2 of 13

HOPE CREEK GENERATING STATION, Lower Alloways Creek Permit No.NJ0025411PER020001 Consolidated Renewal Permit Action.

1. Discharge Requirements

a. The permittee shall discharge at the location(s) specified in PART III of this permit.

b. The permittee shall not discharge foam, or cause objectionable deposits, or foaming of thereceiving water.

c. The permittee's discharge shall not produce objectionable color or odor in the receiving stream.

d. The discharge shall not exhibit a visible sheen.

e. The Permittee is authorized to use the following additives:

DSN 461A: sodium hypochlorite, ammonium bisulfite and sodium hydroxide. Refer to item G. 1.for more information concerning chlorine produced oxidants. There shall be no detectableamount of the 126 priority pollutants contained in chemicals added for cooling tower maintenancein the discharge from DSN 461A.

DSN 461C: Carbohydrazide, Ammonium Hydroxide, Hydrazine.

All outfalls: If the permitee decides to begin using additional agents or replace the above agents inthe future, the permitee must notify the Department at least 180 days prior to use so that thepermit may be reopened, if necessary, to incorporate any additional limitations deemed necessary.

2. Applicability of Discharge Limitations and Effective Dates

a. This permit includes a schedule for compliance for the following parameters:An alternate sample type for chlorine produced oxidants at DSN 461A. The initial phase limitsare. effective from EDP until EDP + 1 year. The final phase will become effective on EDP +1 year

3. Operation, Maintenance and Emergency conditions

a. The permittee shall operate and maintain treatment works and facilities which are installed or usedby the permittee to achieve compliance with the terms and conditions of the permit as specified inthe Operation & Maintenance Manual.

b. The permittee shall develop emergency procedures to ensure effective operation of the treatmentworks under emergency conditions in accordance with NJAC 7:14A-6.12(d).

F. CONDITIONS FOR MODIFICATION

1. Causes for modification

a. Pursuant to N.J.A.C. 7:14A-6.2(a)(10)(iii), the Department may modify or revoke and reissue anypermit to incorporate limitations or requirements to control the discharge of toxic pollutants,including whole effluent, chronic and acute toxicity requirements, chemical specific limitations ortoxicity reduction requirements, as applicable.

b. The Department may incorporate requirements to file monitoring data required by this permitelectronically through a minor modification in accordance with N.J.A.C. 7:14A-16.5(a)I.

c. The permittee may request a minor modification to eliminate the monitoring requirementsassociated with a discharge authorized by this permit when the discharge ceases due to changes atthe facility.

G. Custom Requirement

1. Chlorine Produced Oxidants at DSN 461A:

Industrial Wastewater Page 3 of 13

HOPE CREEK GENERATING STATION, Lower Alloways Creek Permit No.N.J0025411PER020001 Consolidated Renewal Permit Action

a. Chlorine produced oxidants may not be discharged from any unit for more then two hours in anyone day and not more than one unit in any plant may discharge chlorine produced oxidants a[ anyone time. Both these conditions remain in effect unless the permittee can demonstrate to theDepartment that the units in a particular location cannot operate at or below this level ofchlorination. Any alternate condition would be subject to a permit modification.

2. Effluent Temperature at DSN 461A

a. Effluent temperature shall be measured at DSN 461A on a continuous basis. The effluenttemperature values measured over the course of a calendar day shall be averaged on a daily basisconsistent with the definition of daily discharge pursuant to N.J.A.C. 7:14A-1.2. These dailydischarge points shall be utilized for the purposes of completing discharge monitoring reports aswell as for calculation purposes.

3. Discharge of PCB's at all Outfalls

a. There shall be no discharge of polychlorinated biphenyl compounds (PCB's) such as those whichare commonly used ,for transformer fluid.

4. Continuous Monitoring

a. As indicated in Part III, continuous monitoring is required for certain parameters at DSN's 461A,461C, and 462B. In the event the continuous monitors are temporarily unavailable due tomaintenance, calibration, or inoperability of the continuous monitor, the permitee may use one ofthe following methods for reporting during such interim periods:.

i. DSN 461 A Effluent Temperature- temperature detector located at the dechlorination system, atemporary continuous temperature monitor, or manual sampling once per twelve hour shift.

ii. DSN 46 1A Intake Temperature - a temporary continuous t empe:ature monitor, intaketemperature at the adjacent Salem Generating Station, or manual sampling once per twelve hourshift.

iii. DSN 46IA Effluent Flow- an installed float meter, manual measurement of the height over theeffluent weir once per shift, or a calculation based on the difference between intake flow andestimated evaporative losses.

ivw DSN 461A Intake Flow - calculations based on pump run hours.

v. DSN 461A Effluent CPO - manual sampling once per twelve hour shift.

vi. DSN 461C Effluent Flow- calculations based on lift station pump operating hours or pumpingevents.

vii. DSN 462B Effluent Flow - manual measurement of the height of the effluent over a V-notchedweir.

b. Any results from the alternative monitoring methodologies shall not be reported for periods whenthe primary monitoring device is correctly operating. This authorization to use alternativemonitoring methodologies does not alleviate permittee's obligation to maintain the primarymonitoring instrumentation and devices and to ensure their proper operability and availability tothe maximum extent practicable consistent with the applicable requirements of N.J.A.C. 7:14A-Iet. seq.

5. Service Water Bypass

a. To facilitate necessary Station maintenance, the permitee is authorized to temporarily redirectservice water to discharge through DSN 463A, bypassing DSN 461A. The addition of sodiumhypochlorite (or any other chemical biocide authorized by the Department) shall be terminatedduring the bypass discharge. The following conditions shall be met by the permittee when servicewater is discharged through DSN 463A:.

* Industrial Wastewater Page 4 of 13

HOPE CREEK GENERATING STATION, Lower Alloways Creek Permit No.N.J0025411PER020001 Consolidated Renewal Permit Action

i. Provide written notification to the Chief, Bureau of Point Source Permitting-Region 2 and theSouthern Bureau of Compliance Water Enforcement prior to the bypass discharge. Thisnotification shall include the expected dates of the bypass, confirmation that sodiumhypochlorite addition to the service water will be terminated during the bypass, and a briefdescription of the reason the bypass is necessary.

ii. Provide oral notification to the Southern Bureau of Compliance and Water Enforcement at least24 hours prior to commencing the bypass discharge.

6. Flow Measurements using Rhodamine WT Dye

a. The permitee is authorized to perform periodic flow measurement testing of the cooling towerrelated systems using Rhodamine WT Dye as a tracer. This dye will discharge to the DelawareRiver through outfall DSN 461A. The following conditions must be met by the permittee:.

i. Provide written notification to the Chief, Bureau of Point Source Permitting- Region 2 and theSouthern Bureau of Compliance Water Enforcement prior to the use of Rhodamine WT dye.This notification shall include the expected dates of the discharge, the expected concentration ofRhodamine WT dye in the effluent, and the anticipated concentration of Rhodamine WT due tobe added.

ii. Provide oral notification to the Southern Bureau of Compliance and Water Enforcement at least24 hours prior to commencing the discharge of Rhodamine WT dye.

iii. Within thirty (30) days of completion of the flow measurement testing, provide writtennotification of completion to the Chief, Bureau of Point Source Permitting-Region 2 and theSouthern Bureau of Compliance and Water Enforcement. This notification shall include theactual dates of the discharge, the actual concentration of Rhodamine WT dye in the effluent atDSN 46 1A, and the total quantity of Rhodamine WT dye added.

7. Other Regulatory Requirements

a. The permittee shall comply with all regulations set forth in N.J.S.A. 26:2D-1 et seq. regardingRadiation Protection. All radioactive wastes shall be collected, removed, and disposed of inaccordance with N.J.S.A. 7:28-11.1 et seq.

b. The permittee is licensed by the U.S. Nuclear Regulatory Commission (USNRC) and responsibleto that agency for compliance with radiological effluent limitations, monitoring requirements, andother licensing conditions.

8. Section 316 Determination Upon Permit Issuance

a. With respect to Section 316 (b), the Department will make a determination at the time of permitrenewal which will include, but will not be limited to, an evaluation of whether technologies, theircosts and benefits, and potential for application at the Station have changed.

9. Compliance with DRBC Requirements

a. The permittee shall discharge so as not to violate the Delaware River Basin Commission WaterQuality Regulations as amended for Zone 5 waters. This includes the stream quality objectivesfor radioactivity namely: alpha emitters - maximum 3 pc/L (picocuries per liter) and beta emitters- maximum 1000 pc/L.

b. The permittee shall ensure that any thermal discharge complies with the temperature and heatdissipation requirements imposed in any current DRBC docket D-73-193 CP and any revisionsthereto.

10. Alternate Temperature Condition

Industrial Wastewater Page 5 of 13

HOPE CREEK GENERATING STATION, Lower Alloways Creek Permit No.NJ0025411PER020001 Consolidated Renewal Permit Action

a. Given a coincident occurrence of a wet bulb temperature that exceeds 76 degrees Fahrenheit and arelative humidity below 60 percent during a given day for a period equal to or greater than 60minutes, the daily maximum temperature limit does not apply and monitoring only is required. Ifthese two conditions for wet bulb temperature and relative humidity occur, as well as anexceedance of the temperature limit of 97.1 degrees Fahrenheit at DSN 461A, the permittee isrequired to submit a chart with columns for the following data for each hour of that day: (1)Cooling Tower Blowdown Flow (gpm); (2) Intake Temperature (degrees Fahrenheit); (3)Blowdown Temperature (degrees Fahrenheit); (4) Change in Temperature (degrees Fahrenheit);(5) MBTU/Hour; (6) Dry Bulb Temperature (degrees Fahrenheit); (7) Dew Point Temperature(degrees Fahrenheit); (8) Wet Bulb Temperature (degrees Fahrenheit); and (9) Relative Humidity(percent).

b. Dry bulb temperature, dew point, barometric pressure and wind speed and direction are measuredat 15-minute intervals at Hope Creek's meteorological Station. Wet bulb temperature and relativehumidity are computed using measurements of dry bulb temperature and dew point with anumerical algorithm that relates the, dependence of wet bulb temperature and relative humidity ondew point, dry bulb temperature, and atmospheric pressure. In the event that data are notavailable from the Hope Creek meteorological Tower, then PSEG may utilize data collected at theWilmington meteorological Station (Wilmington). The use of another alternative source (otherthan Hope Creek meteorological Tower data or Wilmington metorological Station) must beapproved in advance by the Department and duly noted on the monitoring report form. Thepermittee must retain records of the Wilmington data or any other data in its monitoring reportform back up file for the term specified by the applicable provisions of the NJPDES regulations.

11. Proper Operation and Maintenance of Cooling Tower

a. The Department reserves the right to revoke the alternate temperature condition at DSN 461A,which is conditional on the occurence of extreme meteorological conditions, if it is determinedthat the cooling tower is not being properly operated and maintained.

. Industrial Wastewater

Page 6 of 13

HOPE CREEK GENERATING STATION, Lower Alloways Creek Permit No.NJ0025411PER020001 Consolidated Renewal Permit Action

Stormwater

A. Monitoring

1. (Reserved)

B. Reporting

1. (Reserved)

C. Record Keeping

1. (Reserved)

1. Submittals

1. (Reserved)

E. Operations and Maintenance

1. (Reserved)

F. Stormwater Pollution Prevention Plan

1. (Reserved)

G. Site Specific Best Management Practices

1. (Reserved)

IH. Custom Requirement

1. Stormwater Pollution Prevention Plan

The following outline provides the key elements of an acceptable Stormwater PollutionPrevention Plan (SPPP). The purpose of the SPPP is to meet the following objectives:

a. to identify potential sources of pollutants and source materials onsite which may reasonably beexpected to affect the quality of stormwater discharges associated with industrial activity.

b. to describe and ensure that practices are implemented to eliminate and/or reduce pollutants fromsource materials in stormwater discharges associated with industrial activity.

c. to ensure compliance with the terms and conditions of this permit.

Note: Source materials are defined as any material or machinery, located at the facility anddirectly or indirectly related to process or other industrial activities, which could be a source ofpollutants in a stormwater discharge associated with industrial activity that is subject to the CleanWater Act and/or 40 CFR 122.26. Source materials include, but are not limited to, rawmaterials;intermediate products; final products; waste materials; by-products; industrialmachinery and fuels; and lubricants, solvents, and detergents that are related to process or otherindustrial activities. Material or machinery that are not exposed to stormwater or that are notlocated at the facility are not source materials.

stormwater Page 7 of 13

HOPE CREEK GENERATING STATION, Lower Atloways Creek Permit NoNJ0025411PER020001 Consolidated Renewal Permit Action

2. Stormwater Pollution Prevention Team

The permittee shall continue to identify a Stormwater Pollution Prevention Team in the SPPP.The SPPP shall be updated to name specific individuals or positions within the facilityorganization if members of the team change. The team is responsible for implementing theSPPP in accordance with good engineering practices, and for the plan's implementation andmaintenance. The plan shall clearly identify the responsibilities of each team member. Theactivities and responsibilities of the team shall address all aspects of the facility's SPPP whichare provided below.

3. Description of Existing Environmental Management Plans

The team shall evaluate the facility's exisiting environmental management plans andprograms for consistency with this permit and determine which provisions, if any, from theseother plans can be incorporated by reference into the SPPP. Examples of plans which may bereferred to when applicable to the site include: the current BMP Plan, Discharge PreventionContainment and Countermeasures (DPPC), Discharge Cleanup and Removal (DCR),Preparedness Prevention and Contingency Plan (PPCP, 40 CFR Parts 264 and 265), the SpillPrevention Control and Countermeasures (SPPC) requirements (40 CFR Part 112), theNational Pollutant Discharge Elimination System Toxic Organic Management Plan(NPDESTOMP, 40 CFR Parts.413, 433, and 469), and the Occupational Safety and HealthAdministration (OSHA) Emergency Action Plan (29 CFR Part 1910). A copy of any plansreferred to in the SPPP should be kept on-site with the SPPP.

4. Site Assessment

The Site Assessment shall describe the physical facility and the potential pollutant sources(materials, activities and areas) which may be reasonably expected to affect the quality ofstormwater discharges. The key elements of the site assesssment shall include, at a minimum,the following requirements:

a. Inventory Requirements

The facility must update annually (more frequently if considered appropriate) an inventory,which includes, at a minimum, the following:.

i. list of the general categories of source materials that have been used, loaded/unloaded, stored,treated, spilled, leaked and/or disposed onsite in a manner to allow exposure to stormwater.

ii.. list of any domestic watewater, non-contact cooling water, treated groundwater or processwastewater that is generated at the facility and discharged through seperate storm sewers tosurface waters. List any current NJPDES permits or permit applications that the facility mayhave for such discharges.

b. Mapping Requirements

A site map drawn to an appropriate scale that clearly shows the following:.

i. buildings and other permanent structures.

ii. paved areas and roadways.

iii. Surface water bodies (e.g., rivers, lakes, streams, bays, estuaries) that are located on or about theproperty which receive or may receive stormwater from the site.

iv. location of all stormwater discharge points and outfalls.

v. location of each point or sewer segment, where domestic wastewater, treated groundwater,process wastewater or non-contact cooling water generated by the facility enters storm sewersthat discharge to surface waters.

. Stormwater Page 8 of 13

HOPE CREEK GENERATING STATION, Lower Alloways Creek Permit No.N.J002541 1PER020001 Consolidated Renewal Permit Action

vi. outline of the drainage area within the facility boundaries for each stormwater outfall and adepiction of the flow direction (e.g., arrowhead of stormwater in each drainage area).

vii. locations where source materials are likely to be exposed to stormwater, and the followingactivities and/or areas, at a minimum; storage areas, palleted materials, outdoor handling,treatment or disposal areas, loading and/or unloading areas, manufacturing and/or processingareas, waste storage areas, vehicles/equipment maintenance areas, vehicle/equipment fuelingareas, hazardous waste storage or disposal areas, areas of spills and/or leaks of source materials,and access routes.

viii. locations of existing stormwater structural control measures (e.g., containment, berms,dentention/retention basins, grassed swales).

ix. areas of exisiting and potentential soil erosion.

c. Narrative Description of Exisiting Conditions

The SPPP shall continue to include a narrative description concerning the-existing management ofall source materials at the facility which are handled, treated, stored, disposed, or which otherwiseexist in a manner allowing contact with stormwater. The narrative description shall be updated toreflect current practices and address the following where appropriate:.

i. any discharges of domestic wastewater, non-contact cooling water, treated groundwater orprocess waste that are listed in accordance with Item H.4.a.ii above (unless such discharges havebeen authorized by this or other NJPDES permits or identified in applications or requests forauthorization submitted for other NJPDES permits).

ii. description of types of industrial activities and/or areas (e.g. fueling material handling,manufacturing or processing areas) at the site.

iii. the actual or potential pollutant categories associated with each industrial area and/or activitywhere source materials are likely to be exposed to stormwater including, but not limited~to:fueling stations, loading/unloading areas, maintenance shops, areas where spills and/or leaks ofsource materials frequently occur, equipment or vehicle cleaning areas, outdoor storageareas,outdoor manufacturing or processing areas , onsite waste disposal areas, abovegroundliquid storage tanks, outside storage of raw materials, by-products, or finished products, (e.g.,fueling area - diesel fuels, gasoline, petroleum hydrocarbons).

iv. a description of existing management practices employed to: eliminate contact of sourcematerials with stormwater; minimize or reduce pollutants from source materials throughstructural or non-structural measures; divert stormwater to specific areas on or off-site, includingdiversions to containment areas, holding tanks, treatment facilities, or sanitary or combinedsewers; treat stormwater discharging from the site; and prevent or permit any discharges ofdomestic wastewater, non-contact cooling water, treated groundwater or process wastewater tosurface water.

5. Best Management Practices (BMP) Selection and Plan Design

The permittee shall continue to evaluate the information from the site assessment phase ofthis plan to identify potential and existing sources of stormwater containment by sourcematerial. All discharges to surface water of domestic wastewater, non-contact cooling water,treated groundwater and process waste water must be eliminated or permitteed by this oranother NJPDES permit. Based upon the site assessment performed, the permittee shalldevelop BMPs that will effectively eliminate or reduce pollutant loadings in stormwaterdischarges from the facility in accordance with the following sections. BMPs are measuresused to prevent or mitigate pollution from any type of activity. The evaluation and selectionof the)BMPs addressing each area, and/or activity where source materials are exposed tostormwater discharging to surface water, shall be documented in the SPPP and shall includeat a minimum the following BMPs:

Stormwater Page 9 of 13

HOPE CREEK GENERATING STATION, Lower Alloways Creek Permit No.NJA02541oPERO)20001 Consolidated Renewal Permit Action

a. Non-Stormwater Discharges into Storm Sewers

The facility shall ensure that it does not generate and discharge, through storm sewers to surfacewaters, any domestic wastewater, non-contact cooling water, treated groundwater or processwastewaters unless that discharge is authorized by this or another NJPDES permit or identified inan application or request for authorization submitted for another NJPDES permit.

b. Removal, Cover or Control of Industrial Activities

Except as specified and required herein for certain, specific exposures of source materials, allother source materials shall be moved indoors, covered, used, handled, and/or stored in a mannerso as to minimize contact with stormwater that is discharged to surface water. Each BMP thatprevents such contact shall be identified and discussed in the SPPP.

c. Diverting Stormwater

Approved diversion of contaiminated stormwater to either a domestic or industrial wastewatertreatment plant may also be considered when choosing an appropriate BMP where feasible.(Diversion to groundwater may require a seperate NJPDES permit. Consult the Department'sGroundwater Permitting Unit at (609) 292-0407).

d. Spill Prevention and Response

Identify in the SPPP areas where actual or potential spills of source materials are exposed tostormwater and may be discharged with stormwater. Include their accompanying drainage points.Where appropriate, specific material handling procedures, storage requirements and use ofequipment such as diversion valves shall be developed and practiced to prevent and/or eliminatespills and/or leaks of source materials from being exposed to stormwater. Procedures for cleaningup spills shall be specifically included in the plan and made available to the appropriate personnel

• through scheduled employee training. In addition, the facility shall provide and otherwise makeavailable to its personnel the appropriate and neccessary small cleanup equipment to effect animmediate and thorough spill cleanup.

e. Good Housekeeping

The SPPP must continue to include a good housekeeping program to help maintain a clean andorderly work place. For certain activities or areas, the discharge of stormwater exposed to sourcematerials may be prevented merely by using good housekeeping methods. The following aresome simple procedures that a facility can consider incorporating into an effective goodhousekeeping program:.

i. conduct cleanup immediately after discovery of leaks and spills,.

ii. implement careful material storage practices,.

iii. improve operation and maintenance of industrial machinery and processes,.

iv. maintain an up-to-date material inventory,.

v. maintain well organized work areas,.

vi. provide regular pickup and disposal of waste materials,.

vii. maintain clean and dry floors and ground surfaces by using brooms, shovels, vacum cleaners, orcleaning machines, and.

viii. train employees about good housekeeping practices.

. Stormwater Page 10 of 13

HOPE CREEK GENERATING STATION. Lower Alloways Creek Permit No.NJ0025411PER020001 Consolidated Renewal Permit Action

f. Preventative Maintenace

The SPPP shall continue to include a Preventative Maintenance Program to include timely andregular inspections and maintenance of stormwater management devices (e.g., cleaning oil/waterseparators, catch basins, drip pans, detention basins, covers, treatment units) and routineinspections of facility equipment and operations to detect faulty equipment. Equipment (such astanks, piping, containers, and drums) should be checked regularly for signs of deterioration.

g. Inspections and Evaluation Process.

i. Regular Inspections

The SPPP shall require regular inspections of the facility's equipment, exposed source materialsand industrial areas to provide that all elements of the SPPP are in place and working properly.Inspections shall be conducted by qualified, trained plant personnel. Records of theseinspections shall be kept onsite and shall contain, at a minimum: date, locations of any identifiedproblems, steps taken to correct problem and prevent reoccurence, and the inspectors' names andtitles. These reports shall also record any incidents such as leaks, accidental'discharges, andfailures or breakdowns of structual BMPs.

ii. Annual Inspections

The SPPP shall require an annual inspection of the entire facility in accordance with Item H.9.b.

below.

iii. Evaluation Process

The SPPP shall include a system to routinely and continually evaluate the SPPP foreffectiveness, flaws that have developed, and required maintenance. The routine evaluationmust include, but not be limited to, regular annual inspections, inspection logs and records,internal reporting, plan revisions to correct flaws detected in the SPPP or to reflect changes,additions at the facility, and logs of preventive maintenance performed at the facility. Inaddition, the Annual Reports and Certifications required under Item H.9.b below,, are integral tothe evaluation process.

6. Implementation Schedule

The SPPP shall continue to include an implementation schedule for all new or retrofittedstructural and non-structural BMIPs. This shall include a schedule(s) for the removal,coverage, and minimization of exposure of source materials to stormwater and/or stormwaterdiversion ot treatment.

7. General Plan Requirements

This section provides additional requirements to the administrative requirements related tothe finalized SPPP. It covers required signatures and requirements for plan location andaccess.

a. Required Signatures for the SPPP and Stormwater Certifications

The SPPP and Stormwater Certifications shall be signed as follows.i. for a corporation, by a principal executive officer of a least the level of vice president.

ii. for a partnership or sale proprietorship, by a general partner of the proprietor respectively.

iii. for a municipality, State, Federal or other agency, by either a principal executive officer or aranking officer.

Stormwater Page 11 of 13

HOPE CREEK GENERATING STATION, Lower Alloways Creek Permit No.NJ002541 1PER020001 Consolidated Renewal Permit Action0

iv. for i., ii., or iii. above, by a duly authorized representative, provided that: the representative isauthorized by a person described in i., ii., or iii. above; this authorization specifies either anindividual or a position responsible for the overall operation of the regulated facility or activity(e.g., plant manager, superintendent); and the written authorization was submitted to theDepartment.

b. Plan Location and Public Access.

i. The SPPP and inspection and preventative maintenance records or logs shall be maintainedonsite at all times. These documents must be made available, upon request, to a representativeof the Department and to the owner and operator of any municipal separate storm sewerreceiving the stormwater discharge.

ii. Updates of the facility's SPPP shall be submitted annually to the Regional Water Complianceand Enforcement Offices, the Bureau of Point Source Permitting-Region 2, Bureau of NonpointPollution Control and to the Department's Central File Room.

8. Special Requirements

a. Facilities Subject to Emergency Planning and Community Right-to-Know Statute

For facilities subject to the Emergency Planning and Community Right-to Know Act (EPCRA)Section 313, the SPPP shall include, or cite the location of any spill reports prepared under thatAct.

b. Facilities with SPCC Plans, DPCC Plans, or DCR Plans

The SPPP shall include, or cite the location(s) of, any Spill Prevention Control andCountermeasures Plan (SPCC Plan) prepared under 40 CFR 112 and Section 3.1 of the CleanWater Act, 33 U.S.C. S 1321; and any Discharge Prevention, Containment and CountermeasuresPlan (DPCC plan) and Discharge Cleanup and Removal Plan (DCR plan) prepared under N.J.A.C7.1 E.

c. Facilities Undergoing Construction Activities

Whenever construction activities are undertaken at the facility, the SPPP shall be amended, ifneccessary, so that the SPPP continues to be accurate and to meet the requirements of this permit.

9. Compliance - Inspections and Reports

a. Submit an SPPP Implementation and Inspection Recertification: annually from the effective dateof the permit (EDP) which is consistent with the schedule that was established in the formerpermit, (e.g., if the recertification was due to be submitted by July 1 of each subsequent year thenunder the renewed permit the recertification shall continue to be submitted on July 1 of any givenyear).

b. The permittee shall submit the following recertification to the Bureau of Permit Management onthe Monitoring Report - Transmittal Sheet annually:

"I certify that the facility has been inspected to identify areas contributing to the stormwaterdischarge(s) authorized under NJPDES/DSW permit No. NJ0025411 and to evaluate whether thestormwater pollution prevention plan (SPPP) prepared under the permit complies with the permitand is properly implemented.".

c. The permittee shall continue to conduct annual inspections of the facility to assess all areascontributing to the stormwater discharge authorized by this permit and to evaluate whether theSPPP complies with, and is implemented in accordance with this permit, and whether additionalmeasures are needed to meet the conditions of this permit. A summary of each inspection shall beincluded in the SPPP.

. Stormwater Page 12 of 13

HOPE CREEK GENERATING STATION, Lower Alloways Creek Permit No.NJO02541 IPER0200L'M Consolidated Renewai Permit Action

d. The permittee shall prepare a report annually summarizing the inspection. This report shallinclude the date of inspection and name(s) and titles(s) of the inspector(s) and shall accompanythe certification above that the facility is in compliance with its SPPP and this permit, except thatif there are any incidents of non-compliance, those incidents shall be identified in the certification.If there are incidents of non-compliance, the report shall identify the steps being taken to remedythe noncompliance and to prevent such inicidents from reocurring. The report and certificationshall be signed in accordance with Item H.7.a. of this permit, and a copy shall be maintainedonsite for a period of five years. This period may be extended by written request by theDepartment at any time.

Stormwater Page 13 of 13

ATTACHMENT 1:CONTENTS OF THE

STORMWATERPOLLUTION PREVENTION PLAN

Table of Contents

I. Stormwater Pollution Prevention Plan .................................................................... III. Stormwater Pollution Prevention Team ...................................................................... IIII. Description of Existing Environmental Management Plans ...................................... 1IV. Site Assessment .............................................................. 1

A. Inventory Requirements .................................... 2B. Mapping Requirements ............................................................................. 2C. Narrative Description of Existing Conditions ..................... 3

V. Best Management Practices (BMP) Selection and Plan Design ............................ 3A. Non-Stormwater Discharges into Storm Sewers ....................................... 4B. Removal, Cover or Control of Industrial Activities .................................. 4C . D iverting Storm w ater .................................................................................. 4D. Spill Prevention and Response ................................................................ 4E . G ood H ousekeeping .................................................................................. 4F. Preventative Maintenance ........................................................................... 5G. Inspections and Evaluation Process ........................................................... 5

V I. Im plem entation Schedule .................................................................................... 6V II. G eneral Plan R equirem ents .................................................................................... 6

A. Required Signatures for SPPP and Attachments 2 and 3 ........................... 6B. Plan Location and Public Access ............................................................... 7C. Certification of Stormwater Pollution Prevention Plan .............................. 7

V III. Special R equirem ents ......................................................................................... 7A. Facilities Subject to Emergency Planning and Community Right-to-KnowStatute ....................................................................................................... . . ... 7B. Facilities with SPCC Plans, DPCC Plans, or DCR Plans .......................... 7C. Facilities Undergoing Construction Activities .......................................... 8

i

I. Stormwater Pollution Prevention Plan

The following outline provides the key elements of an acceptable Stormwater PollutionPrevention Plan (SPPP). The purpose of the SPPP is to meet the following objectives:

A. to identify potential sources of pollution and source materials onsite which may reasonablybe expected to affect the quality of stormwater discharges associated with industrialactivity;

B. to describe and ensure that practices are implemented to eliminate and/or reduce pollutantsfrom source materials in stormwater discharges associated with industrial activity; and

C. to ensure compliance with the terms and conditions of this permit.

II. Stormwater Pollution Prevention Team

The permittee shall form and identify a Stormwater Pollution Prevention Team in the SPPP. TheSPPP shall name a specific individual or individuals within the facility organization who aremembers of the team. The team is responsible for developing the SPPP in accordance with goodengineering practices, and in the plan's implementation, and maintenance. The plan shall clearlyidentify the responsibilities of each team member. The activities and responsibilities of the teamshall address all aspects of the facility's SPPP which are provided below.

IlI. Description of Existing Environmental Management Plans

The SPPP team shall evaluate the facility's existing environmental management plans andprograms for consistency with this permit and determine which provisions, if any, from theseother plans can be incorporated by reference into the SPPP.

Examples of plans which may be referred to when applicable to the site include: DischargePrevention Containment and Countermeasure (DPCC), Discharge Cleanup and Removal (DCR),Preparedness Prevention and Contingency Plan (PPCP, 40 CFR Parts 264 and 265), the SpillPrevention Control and Countermeasures (SPCC) requirements (40 CFRPart 112), the NationalPollutant Discharge Elimination System Toxic Organic Management Plan (NPDESTOMP, 40CFR Parts 413, 433, and 469), and the Occupational Safety and Health Administration (OSHA)Emergency Action Plan (29 CFR Part 1910). A copy of any plans referred to in the SPPP shouldbe kept on-site with the SPPP.

IV. Site AssessmentThe Site Assessment shall describe the physical facility and the potential pollutant sources(materials, activities and areas) which may be reasonably expected to affect the quality of

1

stormwater discharges. The key elements of the site assessment shall include, at a minimum, thefollowing requirements:

A. Inventory Requirements

Each facility must develop and update annually, as appropriate, an inventory which includes, at aminimum, the following:

1. list of the general categories of source materials that have been used, loaded/unloaded, stored,treated, spilled, leaked and/or disposed onsite in a manner to allow exposure to stormwater; and

2. list of any domestic wastewater, non-contact cooling water, or process waste water (seedefinitions in Part IV of permit), that is generated at the facility and discharged through separatestorm sewers (see definition in Part IV of permit) to surface waters. List any current NJPDES(New Jersey Pollutant Discharge Elimination System) permits or permit application that thefacility may have for such discharges.

B. Mapping Requirements

A site map drawn to an appropriate scale that clearly shows the following:

1. buildings and other permanent structures;

2. paved areas and roadways;

3. surface water bodies (e.g., rivers, lakes, streams, bays, estuaries) that are located on or abutthe property which receive or may receive stormwater from the site;

4. all stormwater discharge locations;

5. location of each point or sewer segment, where domestic sewage, process waste water, ornon-contact cooling water generated by the facility enters storm sewers that discharge to surfacewaters;

6. outline of each drainage area within the, facility boundaries and a depiction of flow direction(e.g., arrow head) of stormwater in each drainage area;

7. locations where source materials are likely to be exposed to stormwater, and the followingactivities and/or areas, at a minimum; storage areas, palleted materials, outdoor handling,treatment or disposal areas, loading and/or unloading areas, manufacturing and/or processingareas, waste storage areas, vehicle/equipment maintenance areas, vehicle/equipment fuelingareas, hazardous waste storage or disposal areas, areas of spills and/or leaks of sourcematerials, and access routes;

2

8. location of existing stormwater structural control measures (e.g., containment, berms.detention/retention basins, grassed swales, oil/water separators); and

9. areas of existing and potential soil erosion.

C. Narrative Description of Existing Conditions

The SPPP shall include a narrative description concerning the existing management of all sourcematerials at the facility which are handled, treated, stored, disposed, or which otherwise exist in amanner allowing contact with stormwater. The narrative description shall address the followingwhere appropriate:

1. any discharges of domestic sewage, non-contact cooling water, or process water that are listedin accordance with A.2 above (unless such discharges have been authorized by other NJPDESpermits or identified in applications or requests for authorization submitted for other NJPDESpermits);

2. description of type of industrial activities and/or areas (e.g., fueling, material handling,manufacturing or processing areas) at the site;

3.. the actual or potential pollutant categories associated with each industrial area and/or activitywhere source materials are likely to be exposed to stormwater including, but not limited to:fueling stations, loading/unloading areas, maintenance shops, areas where spills and/or leaks ofsource materials frequently occur, equipment or vehicle cleaning areas, outdoor storage areas,outdoor manufacturing or processing areas, onsite waste disposal areas, above ground liquidstorage tanks, outside storage of raw materials, by-products, or finished products, (e.g., fuelingarea - diesel fuels, gasoline, petroleum hydrocarbons); and

4. a description of existing management practices employed to : a) eliminate contact of sourcematerials with stormwater; b) minimize or reduce pollutants from source materials throughstructural or non-structural 'iMeasures; c) divert stormwater to specific areas on or off-site,including diversion to containment areas, holding tanks, treatment facilities, or sanitary orcombined sewers; d) treat stormwater discharging from the site; and e) prevent or permit anydischarges of domestic wastewater, non-contact cooling water, or process wastewater to surfacewater.

V. Best Management Practices (BMP) Selection and Plan Design

The permittee shall evaluate the information from the site assessment phase of this plan toidentify potential and existing sources of stormwater contaminated by source material. Alldischarges to surface water of domestic sewage, non-contact cooling water, and processwaste water must be eliminated or permitted. Based upon the site assessment performed, thepermittee shall develop BMP's that will effectively eliminate or reduce pollutant loadings instormwater discharges from the facility in accordance with the following sections. BMPs are

3

measures used to prevent or mitigate pollution from any type of activity. The evaluation andselection of the BMP's addressing each area, and/or activity where source materials are exposedto stormwater discharging to surface water, shall be documented in the SPPP and shall include ata minimum the following BMPs:

A. Non-Stormwater Discharges into Storm Sewers

The facility shall ensure that it does not generate and discharge, through storm sewers to surfacewaters, any domestic sewage, non-contact cooling water, or process wastewaters, unless thatdischarge is authorized by another NJPDES permit or identified in an application or request forauthorization submitted for another NJPDES permit.

B. Removal, Cover or Control of Industrial ActivitiesC

Except as specified and required in Part IV of the permit for certain, specific exposures of sourcematerials, all other source materials shall be moved indoors, covered, used, handled, and/orstored in a manner so as to prevent contact with stormwater that is discharged to surface water.Each BMP that prevents such contact shall be identified and discussed in the SPPP.

C. Diverting Stormwater

Approved diversion of contaminated stormwater to either a domestic or industrial wastewatertreatment plant may also be considered when choosing an appropriate BMP where feasible.(Diversion to groundwater may require a separate NJPDES permit. Consult the Bureau ofNonpoint Pollution Control.)

D. Spill Prevention and Response

Areas where actual or potential spills of source materials are exposed to stormwater dischargescan occur, and their accompanying drainage points shall be identified clearly in the SPPP.Where appropriate, specific material handling procedures, storage requirements and use ofequipment such as diversion valves shall be developed and practiced to prevent and/or eliminatespills and/or leaks of source materials from being exposed to stormwater. Procedures forcleaning up spills shall be specifically included in the plan and made available to the appropriate-personnel through scheduled employee training. In addition, the facility shall provide orotherwise make available to its personnel the appropriate and necessary spill cleanup equipmentto effect an immediate and thorough spill cleanup.

E. Good Housekeeping

The SPPP must include a good housekeeping program to help maintain a clean and orderly workplace. For certain activities or areas, the discharge of stormwater exposed to source materials

4

may be prevented merely by using good housekeeping methods. The following are some simpleprocedures that a facility can consider incorporating into an effective good housekeepingprogram:

1. conduct cleanup immediately after discovery of leaks and spills;

2. implement careful material storage practices;

3. improve operation and maintenance of industrial machinery and processes;

4. maintain up-to-date material inventory;.

5. maintain well organized work areas;

6. provide regular pickup and disposal of waste materials;

7. maintain dry and clean floors and ground surfaces by using brooms, shovels, vacuumcleaners, or cleaning machines; and

8. train employees about good housekeeping practices.

F. Preventative Maintenance

The SPPP shall include a Preventative Maintenance Program to include timely and regularinspections and maintenance of stormwater management devices (e.g., cleaning oil/waterseparators, catch basins, drip pans, catch basins, detention basins, covers, treatment units) androutine inspections of facility equipment and operations to detect faulty equipment. Equipment(such as tanks, piping, containers, and drums) should be checked regularly for signs ofdeterioration.

G. Inspections and Evaluation Process

1. Regular Inspections

The SPPP shall require regular inspections of the facility's equipment, exposed source materialsand industrial areas to provide that all elements of the SPPP are in place and working properly.Inspections shall be conducted by qualified, trained plant personnel. Records of theseinspections shall be kept onsite with the SPPP. These inspection records shall consist of thefollowing, at a minimum: date of inspection; location of and problem(s) identified;. steps takento correct problem(s) and prevent recurrence; and inspector's names and title. In addition theseinspection records shall record any incidents such as leaks or accidental discharges, and anyfailures or breakdowns of structural BMPs.

5

2. Annual inspections

The SPPP shall also require an annual inspection and shall include an annual repoi of the entirefacility in accordance with Part IV of this permit.

3. Evaluation Process

The SPPP shall include a system to routinely and continually evaluate the SPPP foreffectiveness, any flaws that may have developed, and maintenance that may be required. Theroutine evaluation must include, but not be limited to, regular and annual inspections, inspectionlogs and records, internal reporting, plan revisions to correct any flaws detected in the SPPP or toreflect changes/additions at the facility, and logs of preventative maintenance performed at thefacility. In addition, the Annual Reports and Certifications required under Part IV are integral tothe evaluation process.

Vl. Implementation Schedule

The SPPP shall include an implementation schedule for all structural and non-structural BMP'sincluding a schedule(s) for removal, coverage, minimization of exposure of source material tostormwater, and/or stormwater diversion or treatment. The schedule shall meet the deadlinesestablished in the permit in accordance with Part IV.

Upon completion of the initial SPPP, those BMP's (e.g., spill response, good housekeeping) thatmay readily be implemented shall be done so within 30 days, if not already practiced.

VII. General Plan'Requirements

This section provides additional requirements on the administrative requirements related tofinalizing your SPPP. It covers (1) required signatures, (2) requirements for plan location andaccess, and (3) required certifications.

A. Required Signatures for SPPP and Attachments 2 and 3

The SPPP and Attachments 2 and 3 shall be signed as follows:

FOR A CORPORATION: a "responsible corporate officer" or duly authorized representative. A"responsible corporate officer" is (i) a president, secretary, treasurer, or vice-president of thecorporation in charge of a principal business function, or any other person who performs similarpolicy or decision-making functions for the corporation; or (ii) the manager of one or moremanufacturing, production, or operating facilities employing more than 250 persons or havinggross annual sales or expenditures exceeding $25 million' (in second-quarter 1980 dollars), if

6

authority to sign documents has been assigned or delegated to the manager, in accordance withcorporate procedures.

FOR A PARTNERSHIP OR SOLE PROPRIETORSHIP: a general partner or the proprietor,respectively, or duly authorized representative.

FOR A MUNICIPALITY, STATE, FEDERAL OR OTHER PUBLIC AGENCY: either aprincipal executive officer or ranking elected official, or duly authorized representative.

A "responsible corporate officer", general partner, proprietor, principal executive officer of apublic agency, or ranking elected official may assign his or her signatory authority for thisCertification to a duly authorized representative, which is a named person or generic position(e.g., plant manager, superintendent, plant engineer, operations manager, etc.) having overallresponsibility for facility operation or the permittee's environmental matters, by submitting aletter to the Bureau of Nonpoint Pollution Control stating said authority and naming the personor position.

Whenever there are two or more permittees for the facility, all of those permittees shall jointlysubmit this Certification, unless permittees received authorization on different dates and thisCertification is therefore due from them at different dates.

B. Plan Location and Public Access

1. The SPPP and inspection and preventative maintenance records or logs shall be maintained onsite at all times. These documents must be made available, upon request, to a representative ofthe Department and to the owner and operator of any municipal separate storm sewer receivingthe stormwater discharge.

2. The SPPP shall be made available to the public upon request. The facility may claim anyportion of the SPPP as confidential in accordance with the provisions set forth in N.J.A.C.7:14A-18.2.

3. A copy of the SPPP shall be submitted to the appropriate Regional Bureau of WaterCompliance and Enforcement and to the Bureau of Nonpoint Pollution Control. Revisions madeto the facility's SPPP shall be submitted also.

C. Certification of Stormwater Pollution Prevention Plan

1. Attachment 2 shall be signed and submitted by the permittee to the Department's Bureau ofNonpoint Pollution Control as required by Part IV of the permit.

2. Attachment 3 shall be signed and submitted by the permittee to the Department's Bureau ofNonpoint Pollution Control as required by Part IV of the permit, and annually thereafter inaccordance with the permit.

7

ViII. Special Requirements

A. Facilities Subject to Emergency Planning and Community Right-to-KnowStatute

For facilities subject to the Emergency Planning and Community Right-to-Know Act (EPCRA)Section 313, the SPPP shall include, or cite the location of, any spill reports prepared under thatAct.

B. Facilities with SPCC Plans, DPCC Plans, or DCR Plans

The SPPP shall include, or cite the location(s) of, any Spill Prevention Control andCountermeasure Plan (SPCC Plan) prepared under 40 CFR 112 and section 311 of the CleanWater Act, 33 U.S.C. § 1321; and any discharge prevention, containment and countermeasure plan(DPCC plan) and discharge cleanup and removal plan (DCR plan) prepared under N.J.A.C. 7:1E.

C. Facilities Undergoing Construction Activities

Whenever construction activities are undertaken at the facility, the SPPP shall be amended, ifnecessary, so that the SPPP continues to be accurate and to meet the requirements of Part I of thispermit.

8

New Jersey Department of Environmental ProtectionBureau of Nonpoint Pollution Control

ATTACHMENT TWO• Stormwater Pollution Prevention Plan (SPPP))

Preparation Certification

Individual Industrial Stormwater Permit

SUBMIT A COPY OF THE PLAN ALONG WITH THIS CERTIFICATION TO THEBUREAU OF NONPOINT POLLUTION CONTROL AND THE APPROPRIATEREGIONAL BUREAU OF WATER COMPLIANCE AND ENFORCEMENT. THEORIGINAL PLAN AND A COPY OF THIS CERTIFICATION ARE TO REMAIN ONSITE AVAILABLE FOR INSPECTION. ALL REVISIONS MADE TO THE PLANALSO SHALL BE SUBMITTED.

Facility Name:

NJPDES No.

"I certify under penalty of law that the Stormwater Pollution Prevention Plan (SPPP),* this Preparation Certification, and all attached documents were prepared by qualified personnel

under my direction or supervision in accordance with a system designed to assure that thisinformation was properly gathered and evaluated. Based on my inquiry of those individualsimmediately responsible for obtaining this information, I believe and certify that the informationin the SPPP and all attached documents is true, accurate, and complete.

"I further certify that a copy of the SPPP and all applicable attachments for thispermitted facility have been submitted to NJDEP's Regional Water Enforcement andCompliance Office and to NJDEP's Bureau of Nonpoint Pollution Control in accordance withAttachment 1 and the deadlines of the permit. I am aware that pursuant to the Water PollutionControl Act, N.J.S.A. 58:1OA-1 et seq., there are significant civil and criminal penalties formaking a false statement, representation, or certification any application, record, or otherdocument filed or required to be maintained under that Act, including fines and/or imprisonment.

"I certify that the SPPP referred to in this SPPP Preparation Certification has been signedand the original is retained at the facility in accordance with the permit, and that it will be fullyimplemented at the facility in accordance with the terms and conditions or the permit. I furthercertify that if any part of this stormwater pollution prevention plan requires the consent of theowner(s) of or another operating entity for the facility, that consent has been obtained."

0

WHO MUST SIGN?

FOR A CORPORATION: a "responsible corporate officer" or duly authorizedrepresentative. A "responsible corporate officer" is (i) a president, secretary,treasurer, or vice-president of the corporation in charge of a principal businessfunction, or any other person who performs similar policy or decision-makingfunctions for the corporation; or (ii) the manager of one or more manufacturing,production, or operating facilities employing more than 250 persons or having grossannual sales or expenditures exceeding $25 million (in second-quarter 1980dollars), if authority to sign documents has been assigned or delegated to themanager in accordance with corporate procedures.

FOR A PARTNERSHIP OR SOLE PROPRIETORSHIP: a general partner or theproprietor, respectively, or duly authorized representative.

FOR A MUNICIPALITY, STATE, FEDERAL OR OTHER PUBLIC AGENCY: either aprincipal executive officer or ranking elected official, or duly authorizedrepresentative.

Att2-10/17/00

New Jersey Department of Environmental ProtectionBureau of Nonpoint Pollution Control

ATTACHMENT THREEStormwater Pollution Prevention Plan (SPPP)

Initial Implementation and Inspection CertificationIndividual Industrial Stormwater Permit

SUBMIT THIS FORM ONCE, AFTER SPPP IS IMPLEMENTED. FOR EXISTINGFACILITIES, THE SPPP MUST BE IMPLEMENTED WITHIN 18 MONTHS FROMTHE EFFECTIVE DATE OF THE PERMIT UNLESS THE DEPARTMENT GRANTSAN EXTENSION.

Facility Name:

NJPDES No.

"I certify under penalty of law that this Stormwater Pollution Prevention Plan (SPPP)Implementation and Inspection Certification and all attached documents were prepared under mydirection or supervision in accordance with a system designed to assure that qualified personnelproperly gather and evaluate this information. Based on my inquiry of the person or personswho manage the system, or those persons directly responsible for gathering this information, theinformation in this Stormwater Pollution Prevention Plan (SPPP) Implementation and InspectionCertification and all attached documents is to the best of my knowledge and belief true,accurate, and complete.

"I certify that the facility has been inspected to identify areas contributing to thestormwater discharge(s) authorized under the permit and to evaluate whether the SPPP preparedcomplies with the permit requirements for stormwater discharge of the permit and is beingproperly implemented.

"I certify that the SPPP referred to in this Stormwater Pollution Prevention PlanImplementation and Inspection Certification has been and will continue to be fully implementedat this facility in accordance with the terms and conditions of the permit. I also specificallycertify that this facility does not generate and discharge, through storm sewers to surface waters,any domestic wastewater, non-contact cooling water, or process waste water (including leachateand contact cooling water) other than stormwater, unless that discharge is authorized by anotherNJPDES permit, identified in an application (or request for authorization) submitted for anotherNJPDES permit or, proof that a determination has been made by the NJDEP that no permit isnecessary.

"I also certify that this facility is not in violation of any condition of the permit forpreparation and implementation of a SPPP, except for. any incidents of noncompliance (whichare noted in the attached report). For any incidents of noncompliance identified in the annual

inspection (or made known to me during the course of the past year), i have attached a reportidentifying these incidents, and identifying steps taken or during the past year), 1 have attached areport identifying these incidents, and identifying steps taken or beina taken to remedy thenoncompliance and to prevent such incidents from recurring. If the attached report identifies anyincidents of noncompliance, I certify that any remedial or preventative steps identified thereinwere or will be taken in compliance with the schedule set forth in the attachment to thiscertification. I am aware that pursuant to the Water Pollution Control Act, N.J. S.A. 5 8: 1 A- I etseq., there are significant civil and criminal penalties for making a false statement,representation, or certification any application, record, or other document filed or required to bemaintained under that Act, including fines and/or imprisonment."

WHO MUST SIGN?

FOR A CORPORATION: a "responsible corporate officer" or duly authorized representative. A "responsible corporate officer"is (i) a president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or anyother person who performs similar policy or decision-making functions for the corporation; or (ii) the manager of one or moremanufacturing, production, or operating facilities employing more than 250 persons or having gross annual sales orexpenditures exceeding $25 million (in second-quarter 1980 dollars), if authority to sign documents has been assigned ordelegated to the manager in accordance with corporate procedures.

FOR A PARTNERSHIP OR SOLE PROPRIETORSHIP: a general partner or the proprietor, respectively, or duly authorizedrepresentative.

FOR A MUNICIPALITY, STATE, FEDERAL OR OTHER PUBLIC AGENCY: either a principal executive officer or ranking electedofficial, or duly authorized representative.

A "responsible corporate officer", general partner, proprietor, principal executive officer of a public agency, or ranking electedofficial may assign his or her signatory authority for this Certification to a duly authorized representative, which is a namedperson or generic position (e.g., plant manager, superintendent, plant engineer, operations manager. etc.) having overallresponsibility for facility operation or the permittee's environmental matters, by submitting a letter to the Bureau of NonpointPollution Control stating said authorirty and naming the person or position.

Whenever there are two or more permittees for the facility, all of those permittees shall jointly submit this Certification,unless permittees received authorization on different dates and this Certification is therefore due from them at differentdates.

(if applicable, print name of corporation, partnership, or public agency submitting this Certification)

(signature) (date)

(print name)

Please attach all reports and plan revisions to this certification and submit it to the

Bureau of Nonpoint Source Control and submit a copy to the appropriate RegionalBureau of Water Compliance and Enforcement. Tha original SPPP and a copy of

this certification are to remain ON SITE available for inspection.Att3-10/18/00

0

'-5tafe r~f Xtft JýersiRichard 1. Codey Department of Environmental Protection BradeIy Cv\. CWI!Acting Governor Division of Water Quality

P.O. Box 029 Trenton, NJ 08625-0029

Phone: (609) 292-4860Fax: (609) 984-7938

CERTIFIED MAILRETURN RECEIPT REQUESTED

Gabor Salaman, Manager - Nuclear SafetyPSEG Nuclear LLCPO Box 236/N21, Alloway Creek Neck RoadHancocks Bridge, NJ 08038

Re: Final Surface Water Major Mod Permit Action - Clarification of BOD5 and TSSMinimum Percent Removal LimitsCategory: B -Industrial WastewaterNJPDES Permit No. NJ0025411Hope Creek Generating StationLower Alloways Creek, Salem County

Dear Mr. Salaman:

The Department issued your final New Jersey Pollutant Discharge Elimination System (NJPDES) permitrenewal on December 31, 2002. It has come to our attention that the BOD3 and TSS minimum percentremoval limits for DSN 462B need clarification. Specifically, the fact sheet references that the limits for BOD5

and TSS percent removal are based on the existing permit issued on February 14, 1996 where that permit statesthe following:

Effluent limitations and conditions for Percent Removal of BOD5 are carried over from the existing permit in accordance wvithNJ.A.C. 7:14A-3.13(a)(12) i and the DRBC Docket Decision D-8-70. The monthly minimum limitation of 87.5% has beenretained based on the DRBC Effluent Quality Requirements and DRBC Docket Decision D-87-70.

Similarly, the following is stated for TSS percent removal:

Effluent limitations and conditions for Percent Removal of Total Suspended Solids (TSS) are carried over from the existing permitin accordance with N.J.A.C. 7:14A-3.13(a)(12) i and the DRBC Docket Decision D-8-70. The monthly minimum limitation of85% has been imposed based on the DR.BC Effluent Quality Requirements.

However, your December 31, 2002 permit specifies that the "Statistical Base" for BOD5 and TSS percentremoval is "Daily Minimum". This statistical base is incorrect and should state "Monthly Average Minimum"which is consistent with both your DRBC docket and the February 14, 1996 permit upon which those limitswere originally based. This permit modification serves to correct the statistical base for BOD5 and TSSpercent removal to "Monthly Average Minimum" at DSN 462B.

This modification therefore affects pages 8 and 9 of Part III for DSN 462B where the corrected pages have beenattached. Because this change is necessary to correct a technical error, the Department is making this changeretroactive to March 1, 2003, which is the effective date of your permit renewal. All other terms and conditionsof your existing permit remain unchanged.

New Jersey is an Equal Opportunity Employer

per._Fnm.rtf Recycled Paper

Thank you for your continued cooperation. Questions or comments regarding the final action should beaddressed to Susan Rosenwinkel at (609) 292-4860.I

Since,,' y,

Pilar PattersonPhi-efBureau of Point Source Permitting Region 2

Enclosurescc: Permit Distribution List

Masterfile #: 15647; PI #: 46815

per Fncm,.rtf

Ig - I

NEW JERSEY POLLUTANT

DISCHARGELNATON SYSTEM

The New Jersey Department of Environmental Protection hereby grants you a NJPDES permit for the facility/activity named in this document. This pemaitis the regulatory mechanism used by the Department to help ensure your discharge will not harma the environment. By complying with the terms andconditions specified, you are assuming an important role in protecting New Jersey's valuable water resources. Your acceptance of this permit is anagreement to conform with all of its provisions when constructing, installing, modifying, or operating any facility for the collection, treatment, or dischargeof pollutants to waters of the state. If you have any questions about this document, please feel free to contact the Department representative listed in thepermit cover letter. Your cooperation in helping us protect and safeguard our state's environment is appreciated.

Permit Number: NJ0025411

Final: Consolidated Minor Modification

Permittee:-PSEG NUCLEAR LLCP0 BOX 236/N21ALLOWAY CREEK NECK RDHANCOCKS BRIDGE, NJ 08D38

Property Owner:PUBLIC SERVICE ELECTRIC AND GAS CO.80 PARK PLAZAPO BOX 570NEWARK, NJ 07102

Co-Permittee:

Location Of Activity:HOPE CREEK GENERATING STATIONARTIFICIAL ISLANDFOOT OF BUTTONWOOD RDLOWER ALLOWAYS CREEK, NJ 08038

Authorization(s) Covered Under This Approval Issuance Date Effective Date Expiration DateB - Industrial Wastewater 12/31/03 3/1/03 2/29/08RF - Stormwater

Authorization(s) Covered Under This Approval Issuance Date I Effective Date Expiration Date

Clarification of Permit Conditions 1/12/05----, 3/1/03 2/29/08

By Authority of:Commissioner's Office DEP AUTHORIZATION

Pilar PattersonBureau of Point Source Permitting - Region 2Division of Water Quality

(Terms, conditions and provisions attached hereto)OI =i,1 U .T M ,M

perJcp.rtf

HOPE CREEK GENERATING STATION, Lower Alloways Creek

PARPIIIILIMITS AND MONITORING REQUIREMENTS

reIl3J' . r'du"U-&

PER050001 Consolidated Minol ermit Action

MONITORED LOCATION GROUP: .Stormwater Discharge

Monitored Location Group Members463 A Stormwater, 464A Stornnwater, 465A Stornwater

Limits And Monitoring Requirements Page 1 of 25

I p.Jr ,.,I.L.L..,s ,at.IL., v-Inure'., flu r..,I1, uvfie, fl~IIfi~JO I.~' OCR

PER050001 Consolidated Minor Mod Permit Action

MONITORED LOCATION: RECEIVING LOCATION: DISCHARGE CATEGORY(IES):461A DSN 461A - dsw Delaware River B - Industrial Wastewater

Location DescriptionSamples shall be collected at a point after combination with all wastewater components and after dechlorination but prior to discharge to the DelawareRiver. DSN 461A is located at latitude 39 degrees, 28', 14" and long. 75 degrees 32' 34". DSN 461A discharges to Zone 5 of the Delaware River. Theinitial period is effective flom the effective date of the permit (EDP) to EDP + 1 year whereas the final period becomes effective on EDP + I year. Thepermittee shall install a continuous sampler for CPO by EDP + 1 year.

Contributing Waste TypesCooling tower blowdown, Other Type of Process H20

Surface Water DMR Reporting Requirements:Submit a Monthly DMR: within twenty-five days after the end of every month beginning from the effective date of the permit (EDP).

Comments:All samples shall be taken at the sampling station identified at DSN 46 IA.

Table III - B - 1: Surface Water DMR Limits and Monitoring RequirementsPHASE: Final PHASE Start Date: 03/01/2004 PHASE End Date:

Parameter Sample Point Limit Limit Units Limit Limit Limit Units Frequency Sample TypeFlow, In Conduit or Effluent REPORT REPORT MGD Continuous MeteredThru Treatment Plant Gross Value Monthly Daily

Average MaximumJanuary thru December QL *****_**_****Flow, In Conduit or Intake From REPORT REPORT MGD Continuous MeteredThru Treatment Plant Stream Monthly Daily

Average MaximumJanuary thru December QLpH Effluent 6.0 9.0 SU 1/Week GrabGross Value ***** Daily **** Daily

Minimum MaximumJanuary thru December QL .***Chlorine Produced Effluent 0.2 0.5 MG/L Continuous GrabOxidants Gross Value ***** Monthly Daily

Average MaximumJanuary thru December RQL 0.1 0.1Temperature, Effluent REPORT 36.2 DEG.C Continuous MeteredoC Gross Value *****- Monthly Daily

Average MaximumJanuary thru December QL ***_ _** *** ***_*_*

Limits And Mo* Requirements

0 Page2ol`25

HOPE CREEK GENERATING STATION, Lower Alloways CreekPe, o NJ0025411

PER050001 Consolidaled MinWlermit Action

Surface Water DMR Reporting Requirements:

Submit a Monthly DM.R: within twenty-five days after tile end of every month beginning friom the effective date of the permit (EDP).Con mments:

All samples shall be taken at the sampling station identified at DSN 46IA.

Table Ill - B - 1: Surface Water DMR Limits and Monitoring Requirements

PHASE:Final PHASE Start Date: 03/01/2004 PHASE End Date:Parameter Sample Point Limit Limit Units Limit Limit Limit Units Frequency Sample Type

Tempcrature, Intake From REPORT REPORT DEG.C Continuous MeteredoC Stream Monthly Daily

Average MaximumJanuary thru December QL *___***_*__ ***_***Carbon, Tot Organic Effluent REPORT REPORT MG/L I/Month Grab(TOG) Gross Value ***** Monthly Daily

Average MaximumJanuary thru December QL *** ***_ *** *** ***Carbon, Tot Organic Effluent Net REPORT REPORT MG/L I/Month Calculated(TOC) Value Monthly Daily

Average MaximumJanuary thru December QL *** *** *******Carbon, Tot Organic Intake From REPORT REPORT MG/L I/Month Grab(TOC) Stream Monthly Daily

Average MaximumJanuary thru December QL *** *Heat (summer) Effluent REPORT 534 MBTU/HR I/Day Calculated'(per Hr.) Gross Value Monthly Daily ***** *****

_ _ Average MaximumJune thru August QL ** *** *** ***Heat (winter) Effluent REPORT 662 MBTU/HR I/Day Calculated(per H-Ir.) Gross Value Monthly Daily ***** ***** ***** 1aCct

Average MaximumSeptember thru May QL *** ***

Limits And Monitoring Requirements

Page 3 of 2_5

rj'.rC UFlCCN %ýAC:t4 a Ir 1 11 0 1r M tI IN, LUWUI ,-u1uwdys k~~tr'elIll NO. (NJUU~e iq I I

PER05000i Consolidated Minor Mod Permit Action

Surface Water DMR Reporting Requirements:Submit a Monthly DMR: within twenty-five days after the end of every month beginning from the effective date of the permit (EDP).

Comments:All samples shall be taken at the sampling station identified at DSN 461 A.

Table III - B - 2: Surface Water DMR Limits and Monitoring RequirementsPHASE:Initial PHASE Start Date: 03/01/2003 PHASE End Date: 02/29/2004

Parameter Sample Point Limit Limit Units Limit Limit Limit Units Frequency Sample TypeFlow. In Conduit or Effluent REPORT REPORT MGD Continuous MeteredThru Treatment Plant Gross Value Monthly Daily

Average MaximumJanuary thru December QL ***_*** *** ***_***pH Effluent 6.0 9.0 SU I/Week GrabGross Value ***** Daily Daily

Minimum MaximumJanuary thru December QL ***_***_***_***_**_Chlorine Produced Effluent 0.2 0.5 MG/L 3/Week GrabOxidants Gross Value ***** Monthly Daily

Average MaximumJanuary thru December RQL ***_*** *** 0.1 0.1Temperature, Effluent REPORT 36.2 DEG.C Continuous MeteredoC Gross Value ***** Monthly Daily

Average MaximumJanuary thru December QL *** *** ***_***_***Temperature, Intake From REPORT REPORT DEG.C Continuous MeteredoC Stream Monthly Daily

Average MaximumJa n u a ry th ru D e c e m b e r Q L * **_* ** * ** ** *_* *Carbon, Tot Organic Effluent REPORT REPORT MG/L I/Month Grab(TOC) Gross Value ***** Monthly Daily

Average MaximumJanuary thru December QL *Carbon, Tot Organic Effluent Net REPORT REPORT MG/L I/Month Calculated(TOC) Value Monthly Daily

Average MaximumJanuary thru December QL *** *** *** *** ***

Limits And Mo*e Requirements

0 Page 4 of 25

HOPE CREEK GENERATING STATION, Lower Alloways Creek PermNJ Ac NJo025411

Surface Water DMR Reporting Requirements:Submit a Monthly DMR: within twenty-five days after the end of every month beginning from the effective date of the permit (EDP).

Comments:

All samples shall be taken at the sampling station identified at DSN 461A.

Table III - B - 2: Surface Water DMR Limits and Monitoring RequirementsPHASE: Initial PHASE Start Date: 03/01/2003 PHASE End Date: 02/29/2004,

Parameter Sample Point Limit Limit Units Limit Limit Limit Units Frequency Sample TypeCarbon, Tot Organic Intake From REPORT REPORT MG/L I/Month Grab(TOC) Stream Monthly Daily

.Average MaximumJanuary thru December QL ***

_**_**__*__*Heat (summer) Effluent REPORT 534 MBTU/HR 1/Day Calculated(per Hr.) Gross Value Monthly Daily

Average Maximum _June thru August QL *** *** *** ***_***Heat (winter) Effluent REPORT 662 MBTU/HR 1/Day Calculated(per Fir.) Gross Value Monthly Daily

Average MaximumSeptember thru May QL *** *** *** *** ***

Limits And Monitoring Requirements

Page 5 of 25

HOPE CREEK GENERATING STATION, Lower Alloways CreekPermit No. NJ0025411

PER050001 Consolidated Minor Mod Permit Action

MONITORED LOCATION: RECEIVING LOCATION: DISCI-HARGE CATEGORY(IES):461C DSN 461C - DSW internal Delaware River B - Industrial Wastewater

Location DescriptionSamples for this internal monitoring point shall be collected after all treatment has been performed and prior to mixing with cooling tower blowdown.This internal discharge point discharges through DSN 461A where DSN 461A discharges at latitude 39 degrees, 28', 14" and long. 75 degrees 32' 34".Contributing Waste TypesOther Type of Process H20

Surface Water DMR Reporting Requirements:Submit a Monthly DMR: within twenty-five days after the end of every month beginning fi'om the effective date of the permit (EDP).

Comments:All samples shall be taken at the sampling station identified at DSN 46 1C.

Table III - C - 1: Surface Water DMR Limits and Monitoring RequirementsPHASE: Final PHASE Start Date: 03/01/2003 PHASE End Date:

Parameter Sample Point Limit Limit Units Limit Limit Limit Units Frequency Sample Type

Flow, In Conduit or Effluent REPORT REPORT MGD Continuous MeteredThru Treatment Plant Gross Value Monthly DailyAverage Maximum

January thru December QL ***_*** ***_***_*_*Solids, Total Effluent 30 100 MG/L I/Month CompositeSuspended Gross Value ***** Monthly Daily

Average MaximumJanuary thru December QL *** ***_**_**__*Petrol Hydrocarbons, Effluent 10 15 MG/L 2/Month GrabTotal Recoverable Gross Value **** ***** **** Monthly Daily

.... _Average MaximumJanuary thru December .QL**********Carbon, Tot Organic Effluent REPORT 50 MG/L I/Month Composite(TOC) Gross Value -**** * *** *** Monthly Daily

Average MaximumJanuary thru December QL ***_***_*** _ ***_***

Limits And Mo@0 Requirements0 PAW 6 of 2' )

HOPE CREEK GENERATING STATION, Lower Alloways Creek PeI. NJO025411PER050001 Consolidated MindW ermit Action

Surface Water WCR - Quarterly Reporting Requirements:

Submit a Quarterly WCR: within twenty-five days after the end of every quarterly monitoring period beginning from the effective date of the permit (EDP). A minin

Comments:

All samples shall be taken at the sampling station identified at DSN 461C.

Table IlII - C - 2: Surface Water WCR - Quarterly Limits and Monitoring Requirements

PHASE: Final PHASE Start Date: 03/01/2003 PHASE End Date: 02/29/2004

Parameter Sample Point Compliance Quantity Units Sample Type Monitoring PeriodNitrogen, Ammonia Effluent Gross Value REPORT. UG/L 24 Hour Composite January thru December

Total (as N) IZinc, Effluent Gross Value REPORT UG/L 24 Hour Composite January thru December

Total Recoverable RQL = 10Cadmium, Effluent Gross Value REPORT UG/L 24 Hour Composite January thri December

Total Recoverable RQL = 4Copper, Effluent Gross Value REPORT UG/L 24 H-our Composite .anuary thin December

Total Recoverable I_______ I__ RQ L=2 _____________i____________ I

Limits And Monitoring Requirements Page 7 of 25

iDOPE CREEK GENERA-TING STATION, Lower Alloways Creek r'ermilt NO. Njuuzq411PER050001 Consolidated Minor Mod Permit Action

MONITORED LOCATION: RECEIVING LOCATION:Delaware River462B dsn 462B - dsw outfall

DISCHARGE CATEGORY(IES):B - Industrial Wastewater

Location DescriptionSamples obtained from this internal monitoring point shall be collected after all treatment has been performed and prior to mixing with cooling towerblowdown. This internal discharge point discharges through DSN 461A where DSN 461A discharges at latitude 39 degrees, 28', 14" and long. 75degrees 32' 34".

Contributing Waste TypesSanitary

Surface Water DMR Reporting Requirements:

Submit a Monthly DMR: Within twenty-five days after the end of every month beginning from the effective date of the permit (EDP)..

Comments:All samples shall be obtained at the sampling station identified as DSN 462B.

Table III - D - 1: Surface Water DMR Limits and Monitoring Requirements

PHASE: Final PHASE Start Date: 03/01/2003 PHASE End Date:- I I , -

Parameter Sample Pointl Limit Limit Units Limit Limit Limit Units Frequency Sampk Type

Flow, In Conduit or Effluent REPORT REPORT MGD I/Day MctcredThru Treatment Plant Gross Value Monthly Daily *

Average Maximum_January thru December QL *** ***

BOD, 5-Day (20 oC) Raw REPORT REPORT MG/L I/Month CompositeSew/influent ***** Monthly Daily

Average Maximum

January thru December QL *****_**_**_*BOD, 5-Day (20 oC) Effluent 8 REPORT KG/DAY 30 45 MG/L 1/Month Composite

Gross Value Monthly Weekly ** Monthly Weekly

Average Average ____ Avera e AverageJanuary thru December QLBOD, 5-Day (20 oC) Percent 87.5 PERCENT I/Month Calculated

Removal ***** Monthly Av ****Minimum

January thru December QL __*_*_*__**_*

SoIIus, m uLotaSuspended

m~awSew/influent

REPORTMonthlyAverace

REPORTDaily

Maximum

MG/L l/Mouth. Composite

January thru December QL- _________ - ____________________ _________ -' _________ I _________ I ____________ J _________

Limits And Moroeuirements O Page 8 of 25

riur~ r-~tr tueI'r\r(MNC 1 11U 0 1 A I IUN, Lower Aiioways ureeKPerý NJ0025411

PER050001 Consolidated MiPrW er.it Action

Surface Water DMR Reporting Requirements:Submit a Monthly DMR: Within twenty-five days after the end of every month beginning from the effective date of the permit (EDP)..

Comments:

All samples shall be obtained at the sampling station identified as DSN 462B.Table lII - D - 1: Surface Water DMR Limits and Monitoring RequirementsPHASE: Final PHASE Start Date: 03/01/2003 PHASE End Date:

Parameter Sample Point Limit Limit Units Limit Limit Limit Units Frequency Sample TypeSolids, Total Effluent

30 45 MG/L I/Month CompositeSuspended Gross Value ***** Monthly WeeklyAverage Averag~eJanuary thru December QL **** ***

Solids, Total Percent 85. REPORT PERCENT l/Month CalculatedSuspended Removal * Monthly Av Monthly

Minimum AverageJanuary thru December QL *****_**__***Oil and Grease Effluent 10 15 MG/L I/Month GrabGross Value *** ** * Monthly Daily

Average MaximumJanuary thru December QL ***_***__**_*** ***Coliform, Fecal Effluent 200 400 #/IOOML I/Month GrabGeneral Gross Value ***** Monthly Weekly

Geo Avg GeometricJanuary thru December QL *

Surface Water WCR - Quarterly Reporting Requirements:Submit a Quarterly WCR: within twenty-five days after the end of every quarterly-monitoring period beginning from the effective date of the permit (EDP). A mininComments:All samples shall be obtained at the sampling station identified as DSN 462B.

Table HI - D - 3: Surface Water WCR - Quarterly Limits and Monitoring RequirementsPHASE: Final PHASE Start Date: 03/01/2003 PHASE End Date: 02/29/2004

Parameter Sample Point Compliance Quantity Units Sample Type Monitoring PeriodCyanide, Total Effluent Gross Value REPORT UG/L Grab January thru December(as CN) RQL = 40

Limits And Monitoring Requirements

Page 9 of 25

I ,~,rc ',c2cx ,,clcrv-, I II1'3 3 srI, IlIIN Lullel PIIIUIIO7~ '..IeeR

PER050001 Consolidated Minor Mod Permit Action

Surface Water WCR - Quarterly Reporting Requirements:Submit a Quarterly WCR: within twenty-five days after the end of every quarterly monitoring period beginning from the effective date of the permit (EDP). A mininComments:All samples shall be obtained at the sampling station identified as DSN 462B.

Table III - D - 3: Surface Water WCR - Quarterly Limits and Monitoring RequirementsPHASE: Final PHASE Start Date: 03/01/2003 PHASE End Date: 02/29/2004

Parameter Sample Point Compliance Quantity Units Samnle Tvne____________________________ ______________ - - - ___________ INickel,

Total RecoverableEffluent Gross Value REPORT

ROL = 1n UG/L 24 Hour CompositeMonitoring Period

January thru DecemberZinc, Effluent Gross Value REPORT UG/L 24 Hour Composite January thru DecemberTotal Recoverable RQL = 10 1 1Cadmium, Effluent Gross Value REPORT UG/L 24 Hour Composite January thru DecemberTotal Recoverable RQL=4

Chromium, Effluent Gross Value REPORT UG/L 24 Hour Composite January thru DecemberTotal Recoverable RQL= 10Copper, Effluent Gross Value REPORT UG/L 24 Flour Composite January thru DecemberTotal Recoverable R RQL = 2

_ _1

Limits And Mo @ Requirements

OPace 10 of 25

HOPE CREEK GENERA't ING STATION, Lower Alloways Creek0 , MeýO . NJUUZb411PER050001 Consolidated Mirn'ermit Action

MONITORED LOCATION: DISCHARGE CATEGORY(IES):SI6A Oil/Water Separator R - Industrial Wastewater

Location DescriptionA representative sample of residuals generated by the Oil/Water Separator shall be analyzed pursuant to the Sludge Quality Assurance Regulations(SQAR, N.J.A.C. 7:14C).

Contributing Waste TypesInd Residual-Other

Residuals DMR Reporting Requirements:

Submit an Annual DMR: due 60 calendar days after the end of each calendar year.

Table III - E - 1: Residuals DMR Limits and Monitoring Requirements

PHASE: Final PHASE Start Date: 03/01/2003 PHASE End Date:Parameter jSample Point Limit Limit Units Limit Limit Limit Units Frequency Sample Type

Nitrate Nitrogen, Industrial REPORT MG/KG 1/Year CompositeDry Weight Residuals Monthly

AverageJanuary thru December QL ***_*** ***_***_***Nitrogen, Kjeldahl Industrial REPORT MG/KG I/Year CompositeTotal, Dry Wt Residuals Monthly

AverageJanuary thru December QL __________****

Styrene Industrial REPORT MG/KG I/Year CompositeResiduals Monthly

AverageJanuary thru December QL _ **_***_*_*_***_**_Nitrogen, Ammonia Industrial REPORT MG/KG I/Year CompositeDry Weight Residuals Monthly

AyerageJanuary thru December QL **** I ***Sulfide, Total Industrial REPORT MG/KG I/Year Composite(as S) Residuals Monthly

_ AverageJanuary thru December QL ***_ _** *** ***_***

Limits And Monitoring Requirements

Pagel11of 25

I U. ~,I*L.L.f* I.~L.I1L.,~fl' hhl'3 0~ I tXJI', CUYV~I P¶IIUVVO7~ tIeeIstOefl Int NO. r4juuz0q11PER050001 Consolidated Minor Mod Permit Action

Residuals DMR Reporting Requirements:Submit an Annual DMR: due 60 calendar days after the end of each calendar year.

Table III - E - 1: Residuals DMR Limits and Monitoring Requirements

'PHASE: Final PHASE Start Date: 03/01/2003 PHASE End Date:Parameter Sample Point Limit Limit Units Limit Limit Limit Units Frequency Sample Type

Magnesium Industrial REPORT MG/KG I/Year CompositeDry Weight Residuals MonthlyAverage

January thru December QL ***_*** **Av*** **_Barium, Total Industrial REPORT MG/KG I/Year Composite(as Ba) Residuals Monthly

AverageJanuary thru December QL *** ***_***_***Bo.ron, Total Industrial REPORT MG/KG 1/Year Composite(as B) Residuals Monthly

AverageJanuary thru December QL *** *** ***__**_*_*Manganese, Total Industrial REPORT MG/KG I/Year Composite(as Mn) Residuals Monthly

AverageJanuary thru December QL ______****_*

Titanium, Total Industrial REPORT MG/KG I/Year Composite(as Ti) Residuals MonthlyAverageJanuary thru December QL *** *** ***_*** *_*

Molybdenum Industrial REPORT MG/KG I/Year CompositeDry Weight Residuals Monthly

AverageJanuary thru December QL ____*_*__*_*

Phosphorus Industrial REPORT MG/KG I/Year CompositeDry Weight Residuals Monthly

AverageJanuary thru December QL *** **

Limits And Mo*O Requirements O0Page 12 of 25

HOPE CREEK GENERATING STATION, Lower Alloways Creek

0Perjtp NJ0025411

PER050001 Consolidated Minw ermit Action

Residuals DMR Reporting Requirements:Submit an Annual DMR: due 60 calendar days after the end of each calendar year.

Table II. - E - 1: Residuals DMR Limits and Monitoring Requirements

PHASE: Final PHASE Start Date: 03/01/2003 PHASE End Date:Parameter Sample Point Limit Limit Units Limit Limit Limit Units Frequency Sample Type

Arsenic, Dry Weight Industrial REPORT MG/KG I/Year CompositeResiduals Monthly___ _ !_ IAverage

January thru December QL *** * *** ***_***Cobalt, Total Industrial REPORT MG/KG I/Year Composite(as Co) Residuals Monthly

AverageJanuary thru December QL *** '_***Silver, Dry Weight Industrial REPORT MG/KG I/Year CompositeResiduals Monthly

AverageJanuary thru December QLAntimony, Dry Weight Industrial REPORT MG/KG I/Year CompositeResiduals Monthly

AverageJanuary thru December QL Avera*eAluminum, Total Industrial REPORT MG/KG I/Year Composite(as Al) Residuals * **** Monthly

AverageJanuary thru December QL ***_**_***Selenium, Dry Weight Industrial REPORT MG/KG I/Year CompositeResiduals Monthly

AverageJanuary thru December QLCopper, Dry Weight Industrial REPORT MG/KG l/Ycar CompositeResiduals Monthly ****

AverageJan u ary thru D ecem ber Q L *** * ** *** ***__* *

Limits And Monitoring Requirements

Page 13 of25

tlHb 11UIQ±K rLNti-A I INU~ Zj I A I gun, Lower mloways u~reeKritl11L 11V. INJUU 4Zq I 1PER050001 Consolidated Minor Mod Permit Action

Residuals DMR Reporting Requirements:Submit an Annual DMR: due 60 calendar days after the end of each calendar year.

Table III - E - 1: Residuals DMR Limits and Monitoring Requirements

PHASE: Final PHASE Start Date: 03/01/2003 PHASE End Date:Parameter Sample Point Limit Limit Units Limit Limit Limit Units Frequency Sample Type

Cadmium, Dry Weight Industrial REPORT MG/KG I/Year CompositeResiduals Monthly,_ _ Average

January thru December QL *** *** ***_ _**_**_Zinc, Dry Weight Industrial REPORT MG/KG I/Year CompositeResiduals Monthly.... .. .._ A verageJanuary thru December QL *** ***_***_***_***

Lead. Dry Weight Industrial REPORT MG/KG I/Ycar CompositeResiduals MonthlyAverageJanuary thru December - QL *** ***_***_***_***

Nickel, Dry Weight Industrial REPORT MG/KG 1/Year CompositeResiduals Monthly

AverageJanuary thru December QL -**_***_**_***__*Mercury, Dry Weight Industrial REPORT MG/KG i/Year CompositeResiduals Monthly

_______ Average ______January thru December QLChromium, Dry Weight Industrial REPORT MG/KG 1/Year CompositeResiduals Monthly

AverageJanuary thru December QL *** *___***_**__***Iron, Dry Weight Industrial REPORT MG/KG 1/Year CompositeResiduals Monthly

AverageJanuary thru December QL * *** *** ***

Limits And Requirements

40 Page 14 01,05

HOPE CREEK GENERATING STATION, Lower Alloways Creek0 Per r 1j.N025411PER050001 Consolidated Mino ermit Action

Residuals DMR Reporting Requirements:Submit an Annual DMR: due 60 calendar days after the end of each calendar year.

Table III - E - 1: Residuals DMR Limits and Monitoring Requirements

PHASE: Final PHASE Start Date: 03/01/2003 PHASE End Date:Parameter Sample Point Limit Limit Units Limit Limit Limit Units Frequency Sample Type

Benzene, Dry Weight Industrial REPORT MG/KG I/Year CompositeResiduals ***** ** *** ***** MonthlyAverage

January thru December QL *** *Bis(2-chloroethyl) Industrial REPORT MG/KG 1/Year Compositeether, Dry Wt Residuals ***** ***** Monthly

Averag-eJanuary thru December QL *** ***Butyl benzyl- Industrial REPORT MG/KG I/Year Compositephthalate, Dry Wt Residuals ***** ***** *****Monthly

AverageJanuary thru December QL *** *** * *-Dimethyl phthalate, Industrial REPORT MG/KG I/Year CompositeDry Weight Residuals ***** ***** Monthly

Average.January thru December QL *** *** *** *** **Naphthalene Industrial REPORT MG/KG I/Year CompositeDry Weight Residuals * Monthly

AverageJanuary thru December - QL * [* *** *** ***2-Chloronaphithalene, Industrial REPORT MG/KG I/Year CompositeDry Weight Residuals ***** ***** Monthly

AverageJanuary thru December QL * *** ***Di-n-butyl phthalate Industrial REPORT MG/KG I/Year CompositeDry Weight Residuals ***** ***** Monthly

__,AverageJanuary thru December QL *** ***

Limits And Monitoring Requirements

Page15 of 25

nort rur It~tA /A, , I ION, Lower ,\iioways ureeKPermit No- NJ0025411PER050001 Consolidated Minor Mod Permit Action

Residuals DMR Reporting Requirements:Submit an Annual DMR: due 60 calendar days after the end of each calendar year.

Table III - E - 1: Residuals DMR Limits and Monitoring Requirements

PHASE: Final PHASE Start Date: 03/01/2003 PHASE End Date:Parameter Sample Point Limit Limit Units Limit Limit Limit Units Frequency Sample Type

Hexachlorobenzene, Industrial REPORT MG/KG I/Year CompositeDry Weight Residuals Monthly_____________________________Average _______________

January thru December QL * **_Carbon Tetrachloride Industrial REPORT MG/KG I/Year CompositeDry Weight Residuals ******* Monthly

AverageJanuary thru December QL *** ***Chlorobenzene, Industrial

REPORT MG/KG I/Year ComposiDry Weight Residuals Monthly

aL_ AverageJanuary thru December QL RP T M/oChloroform Industrial REPORT MG/KG

s/Year Composite

Dry Weight Residuals *** *** ****** •Monthly ***

AverageJanuary thru December QL *** _**_ _**Ethylbenzene Industrial REPORT MG/KG I/Year CompositeDry Weight Residuals Monthly

AverageJanuary thru December QLMethylene Chloride, Industrial REPORT MG/KG I/Year CompositeDry Weight Residuals Monthly

AverageJanuary thru December QL ***_**_*****_*Tetrachloroethylene, Industrial REPORT MG/KG 1/Year CompositeDry Weight Residuals Monthly

..AverageJanuary thru December QL *** *** __*_***

Limits And Moo Requirements 0 0 Page 10 of 25

HOPE CREEK GENERATING STATION, Lower AIloways Creek0 verERLO. NJUUCiemAPER050001 Consolidated Min W ermit Arfion

Residuals DMR Reporting Requirements:

Submit an Annual DMR: due 60 calendar days after the end of each calendar year.

Table III - E - 1: Residuals DMR Limfits and Monitoring RequirementsPHASE: Final PHASE Start Date: 03/01/2003 PHASE End Date:

Parameter Sample Point Limit Limit Units Limit Limit Limit Units Frequency Sample Type

Toluene, Dry Weight Industrial REPORT MG/KG I/Year CompositeResiduals Monthly

Average_January thru December QL *** ***Trichloroethylene, Industrial REPORT MG/KG 1/Year CompositeDry Weight Residuals Monthly

.. __AverageJanuary thru December QL *** _*__**__** _ *_*1,1, 1-Trichloro- Industrial REPORT MG/KG 1/Year Compositeethane, Dry Wt Residuals Monthly

AverageJanuary thru December QL ***_*** * _ **Carbon disulfide Industrial REPORT MG/KG I/Year CompositeResiduals Monthly

AverageJanuary thru December QL *** ***_***_***_***Vinyl acetate Industrial REPORT MG/KG I/Year CompositeResiduals Monthly

AverageJanuary thru December QL ***_*** ***_*** ***Xylenes Industrial REPORT MG/KG I/Year Composite(Total) Residuals Monthly

AverageJanuary thru December QLAcetone Industrial REPORT MG/KG I/Year CompositeResiduals Monthly

AverageJanuary thru December QL *** ***_ _ ** **_ __***

Limits And Monitoring Requirements

Page 17 of 25

HOPE CREEK GENERATING STATION, Lower Alloways Creek r"i n1L INU. INJUUL" 21 I IPER050001 Consolidated Minor Mod Permit Action

Residuals DMR Reporting Requirements:

Submit an Annual DMR: due 60 calendar days after the end of each calendar year.

Table III - E - 1: Residuals DMR Limits and Monitoring Requirements

PHASE: Final PHASE Start Date: 03/01/2003 P1HASE End Date:

Parameter Sample Point Limit Limit Units Limit Limit Limit Units Frequency Sample Type

Phenol, Single Industrial REPORT MG/KG 1/Year CompositeCompound, Dry Wt Residuals Monthly

AverageJanuary thru December QL

2,4-D Industrial REPORT MG/KG I/Year CompositeResiduals Monthly

Average

January thru December QL *

Residuals WCR - Monthly Reporting Requirements:

Submit a Monthly WCR: due 60 calendar days after the end of each calendar month.

Table III - E - 3: Residuals WCR - Monthly Limits and Monitoring Requirements

PHASE: Final PHASE Start Date: 03/01/2003 PHASE End Date:

Parameter Sample Point Compliance Quantity Units Sample Type Monitoring Period

Sludge Landfilled Industrial Residuals REPORT DMT/MO Calculated January thru December

Sludge Land Applied Industrial Residuals REPORT DMT/MO Calculated January thru December

Sludge Disposed Industrial Residuals REPORT DMT/MO Calculated January thru DecemberOut-of-State

Amt Sludge Rmvd, Industrial Residuals REPORT WCY/MvlO Calculated January thru DecemberWet Cubic Yards

Amt Sludge Rmvd, Industrial Residuals REPORT WMT/MO Calculated January thru DecemberWet Metric TonsI

Limits And M Requirements 0 Page 18 of 25

HOPE CREEK GENERATING STATION, Lower Alloways CreekFergi.r'IjUU~et411

PEROfOO0T Consolidnied Mfnoy'ermit Action

Residuals WCR - Monthly Reporting Requirements:Submit a Monthly WCR: due 60 calendar days after the end of each calendar month.

Table III - E - 3: Residuals WCR - Monthly Limits and Monitoring RequirementsPHASE: Final PHASE Start Date: 03/01/2003 PHASE End Date:

Parameter Sample Point Compliance Quantity Units Sample Type Monitoring PeriodAmt Sludge Rmvd, Industrial Residuals REPORT GAL/MON Calculated January tihru DecemberGallonsSludge Bene Use Industrial Residuals REPORT DMT/MO Calculated January thru DecemberOut-of-State

SlTtlge Surface Industrial Residuals REPORT DMT/MO Calculated January thru DecemberDisposedTotal Amount of Industrial Residuals REPORT DMT/MO Calculated January thru DecemberSludge Removed

Sludge Incinerated Industrial Residuals REPORT DMT/MO Calculated January thru DecemberSludge Disposed- Industrial Residuals -: REPORT DMT/MO Calculated January thrn DecemberOther Methods

Sludge/Septage Rcvd Industrial Residuals REPORT WMT/MO Calculated January thru DecemberOffsite Srces Wet MTSludge/Septage Rcvd Industrial Residuals REPORT GAL/MON Calculated January thru DecemberOffsite Srces GalsSludge/Septage Rcvd Industrial Residuals REPORT WCY/MO Calculated January thr, DecemberOffsite Srces Wt Yd3

Solids, Total Industrial Residuals REPORT %TS Composite Janiary thru December

Limits And Monitoring Requirements

Page 19 0125

IIt' (RtAt. NLVtA~ tk(i t 5\ I IJN4, LoeIN Mo#4yZýrPER050001 Consolidated Minor Mod Permit Action

Residuals Transfer Reporting Requirements:

Submit a Monthly RTR: due 60 calendar days after the end of each calendar month.

Limits And M @ Requirements . 0pnrp 2C' 01 25

HOPE CREEK GENERATING STATION, Lower Alloways Creek¾@ PER050001 Consolidated Min perrnit Action

MONITORED LOCATION: DISCHARGE CATEGORY(IES):SLIA STP System B - Industrial Wastewater

Location DescriptionA representative sample of residuals generated by the STP System shall be analyzed pursuant to the Sludge Quality Assurance Regulations (SQAR,N.J.A.C. 7:14C).

Contributing Waste TypesDorn Residual-Other

Residuals DMR Reporting Requirements:Submit an Annual DMR: due 60 calendar days after the end of each calendar year.

Table III - F - 1: Residuals DMR Limits and Monitoring RequirementsPHASE: Final PHASE Start Date: 03/01/2003 PHASE End Date:

Parameter

Solids, Total

January thru December

Nitrate NitrcDry Weight

January thru DecemberNitrogen, KjeldahlTotal, Dry Wt

January thru DecemberPotassiumDry Weight

January thru DecemberNitrogen, AmmoniaDry Weight

January thru December

Limits And Monitoring Requirements

Pagie 21 of 25

HUPI UIti•lN LttM IIINLi I A II IUN, Lower Al!oways L;reeK vermit NO. NJUUZbt 11PER050001 Consolidated Minor Mod Permit Action

Residuals DMR Reporting Requirements:Submit an Annual DMR: due 60 calendar days after the end of each calendar year.

Table III - F - 1: Residuals DMR Limits and Monitoring Requirements

PHASE: Final PHASE Start Date: 03/01/2003 PHASE End Date:Parameter Sample Point Limit Limit Units Limit Limit Limit Units Frequency Sample Type

Calcium Residuals REPORT MG/KG 1/Year CompositeDry Weight Monthly *

AverageJanuary thru December QL ***__**_***_*** **.Molybdenum Residuals REPORT MG/KG 1/Year CompositeDry Weight Monthly

AverageJanuary thru December QL **_ ******_**Phosphorus Residuals REPORT MG/KG 1/Year CompositeDry Weight Monthly

AverageJanuary thru December QL **_**_***_*Arsenic, Dry Weight Residuals REPORT MG/KG 1/Year Composite

Monthly -

AverageJanuary thru December QL ***_***_*** ***_**_Selenium, Dry Weight Residuals REPORT MG/KG 1/Year Composite

Monthly

AverageJanuary thru December. QL ***_***_

_**_***__**Copper, Dry Weight Residuals REPORT MG/KG I/Year Composite

Monthly

AverageJanuary thru December QL ** __**_* ***Beryllium Residuals REPORT MG/KG 1/Year CompositeDry Weight

MonthlyAverageJanuary thru December QL**********

Limits And 4 Requirements

0 Pag 22 of 25

HIUFIL UlK11K UL3N(•A= I INU: i I A I JUN, Lower Aloways ureeK tIl O. NJUU25411PER050001 Consolidated Mi W Permit Action

Residuals DMR Reporting Requirements:Submit an Annual DMR: due 60 calendar days after the end of each calendar year.

Table III - F - 1: Residuals DMR Limits and Monitoring Requirements

PHASE: Final -PHASE Start Date: 03/01/2003 PHASE End Date:Parameter Sample Point Limit Limit Units Limit Limit Limit Units Frequency Sample Type

Cadmium, Dry Weight Residuals REPORT MG/KG 1/Year CompositeMonthlyAverage

January thru December QL ***_***_*** ***_ _**Zinc, Dry Weight Residuals REPORT MG/KG I/Year Composite

MonthlyAverageJanuary thru December QL *** **_**.__**_*

Lead, Dry Weight Residuals REPORT MG/KG 1/Year CompositeMonthly

AverageJanuary thru December QL ***

Nickel,Dry Weight Residuals REPORT MG/KG I/Year CompositeMonthlyAverage

January thru December QL *** *** ***Mercury, Dry Weight Residuals REPORT MG/KG 1/Year Composite

Monthly

AverageJanuary thru December QL *** *** *Chromium, Dry Weight Residuals REPORT MG/KG I/Year Composite

MonthlyAverage

January thru December QL ***_***_*** ***

Limits And Monitoring Requirements

Page 23 of 25

HOPE GREEK GENERATING STAT ION, Lower AlIoways Creek'ermnt No. NJUU2b411PER050001 Consolidated Minor Mod Permit Action

Residuals WCR - Annual Reporting Requirements:Submit an Annual WCR: due 60 calendar days after the end of each calendar year.

Table III - F - 3: Residuals WCR - Annual Limits and Monitoring RequirementsPHASE: Final PHASE Start Date: 03/01/2003 PHASE End Date:

Parameter Sample Point Compliance Quantity Units Sample Type Monitoring PeriodSludge Landfilled Residuals REPORT DMT/YR Calculated January thru DecemberSludge Land Applied Residuals REPORT DMT/YR Calculated January thru December

Sludge Disposed Residuals REPORT DMT/YR Calculated January thru DecemberOut-of-StateAmt Sludge Rmvd, Residuals REPORT WCY/YR Calculated January thru DecemberWet Cubic YardsAmt Sludge Rmvd, Residuals REPORT WMT/YR Calculated January thru DecemberWet Metric Tons--Amt Sludge Rmvd, Residuals REPORT GAL/YEAR Calculated January thru DecemberGallonsSludge Bene Use Residuals REPORT DMTIYR Calculated January thru DecemberOut-of-StateSludge Surface Residuals REPORT DMT/YR Calculated January thru DecemberDisposed

Total Amount of Residuals REPORT DMT/YR Calculated January thru DecemberSludge RemovedSludge Incinerated Residuals REPORT DMT/YR Calculated January thru DecemberSludge Disposed- Residuals REPORT DMT/YR Calculated January thru DecemberOther Methods

Solids, Total Residuals REPORT %TS Composite January thru December

Limits And * !Requirements* Page 24 of 25

HOPE CREEK GENERATING STATION, Lower Alloways Creek0P 05 0 ono t -ed J . MutPe jzrm i Acti

PER050001 Consolidated MirW Permit Action

Residuals Transfer Reporting Requirements:

Submit an Annual RTR: due 60 calendar days after the end of each calendar year.

Limits And Monitoring RequirementsPage 25 of 25

Salem/ Hope Creek Environmental Audit - Post-Audit Information

Question #: GEN-6 Category: General

Statement of Question: Please provide copies of the following NJDEP FactSheets and Draft Permits associated with the response presented at theEnvironmental Audit to Pre-Audit Question # GEN-6:

Fact SheetsA i. 1996 NJ0025411

ii. 2002 NJ0025411iii. 1993 NJ0005622iv. 2000 NJ0005622

Draft PermitsB - Salem 1993 NJPDES Publication Notice, dated 6/24/93

C - HC 1996 Draft Permit Dated 10/96

Response:The requested Fact Sheets and Draft NJPDES permits are being provided. Itshould be noted that (1) item B is an integral part of item A.iii and (2) item C is anintegral part of item A.i.

List Attachments Provided:

A.i / C Preliminary drafts of Public Notice, Fact Sheet, and DraftRenewal NJPDES Permit No. NJ0025411 for the Hope CreekGenerating Station (10/00/1996)

A.ii Public Notice, Fact Sheet, and Draft Renewal NJPDES PermitNo. NJ002541 1 for the Hope Creek Generating Station(11/07/2002)

A.iii / B Public Notice and Fact Sheet for Salem Generating StationDraft Renewal NJPDES Permit No. NJ0005622 (6/24/1993)

A.iv Fact Sheet for Salem Generating Station Draft RenewalNJPDES Permit No. NJ 0005622 (2000)

-1. -A

Christine Todd Whitman.,vernor

p 4

'tMate of Nef ArregDepartment of Environmental Protection

Division of Water QualityCN 029 Trenton, NJ 08625-0029

FAX: (609) 984-7938

NON-PSEGI

Robert C. Shinn, Jr.Commissioner

Mr. Edward KeatingPSE&GP.O. Box 236Hancocks Bridge, New Jersey 08038

OCT o :1?

RE: PSE&G-Hope Creek Generating StationNJPDES/DSW Permit No. NJ0025411Preliminary Draft Copy of Renewal Permit

Please find enclosed a preliminary draft copy of the NJPDES/DSW permit for your facility. This renewal permit is

still subject to change, as it has not yet been fully internally circulated throughout the Department and the DRBC.

The purpose of circulating a preliminary draft permit is to try to resolve any major differences between the

permittee and the Department prior to the start of the "official" public comment period.

Please submit all comments you have on the preliminary draft permit by October 25, 1996. It is the Departmenthope that this review of the preliminary draft permit by the permittee will make the permit process a little smoother

and reduce the number of comments and responses in the final permit action. Please note that comments may bewritten directly on the copy of the draft permit and returned to me, or if deemed necessary, comments may be

written in the form of a letter. If you have any questions, please feel free to contact me at (609)292-4860.

Sincwere y

S'4 Dietrick .Senior Environmental Specialist

• Bureau of Standard PermittingS Ont

WFM342:sudEnclosure

New Jersey Department of Environmental ProtectionDivision of Water Quality

Bureau of Standard Permitting

PUBLIC NOTICE

Notice is hereby given that the New Jersey Department ofEnvironmental Protection proposes to renew the existing NEW JERSEYPOLLUTANT DISCHARGE ELIMINATION SYSTEM/DISCHARGE TO SURFACE WATER(NJPDES/DSW) Permit NJ0025411, in accordance with N.J.A.C. 7:14A-1et. s and by the authority of N.J.S.A. 58:10A-1 et. se-, toprotect the environment and public health and to control dischargesto the Delaware River, classified as Zone 5, from:

Public Service Electric and Gas CompanyHope Creek Generating StationLower Alloways Creek TownshipSalem County, New Jersey

* The applicant operates an electric generating station (SIC number4911) consisting of one nuclear-powered boiling water reactor ratedat approximately 1067 MWe and operated with a recirculating cooling 0water system. This draft permit proposes to authorize dischargesto Zone 5 of the Delaware River.

DSN 461A is the discharge from the recirculating cooling watersystem and discharges approximately 40 MGD of cooling towerblowdown as well as limited quantities of treated wastewater fromDSN 461C and radioactive liquid waste (DSN 461B). DSN 461C (aninternal monitoring point) discharges approximately 0.06 MGD ofoil/water separator effluent. DSN 462B discharges approximately0.03 MGD of sewage treatment plant effluent. DSNs 462A, 463A and464 each discharge approximately 0.2 MGD of stormwater runoff andgroundwater.

The facility has been classified as a major discharger by the NewJersey Department of Environmental Protection in accordance withthe United States Environmental Protection Agency's (USEPA) ratingcriteria.

* A draft NJPDES permit renewal has been prepared for this facility

April 5, 1995 DRAFT - FOR DISCUSSION PURPOSES ONLY

-2-

based on the administrative record filed at NJDEP, 401 East StateStreet, Trenton. Copies of the draft document are obtainable (fora nominal charge) and the administrative record is available forinspection by appointment only, Monday through Friday, bycontacting the NJDEP file room at (609) 292-0400. Specificinformation regarding the draft document may be obtained fromSuzanne U. Dietrick of the Bureau of Standard Permitting at (609)292-4860.

Comments on the draft document or a request that NJDEP hold a non-adversarial public hearing on the document must be submitted, inwriting, to the individual specified below during' the publiccomment period, which closes 30 calendar days after publication ofthis notice. All persons, including the applicant, who believethat any condition of this draft document or NJDEP's tentativedecision to issue this draft permit is inappropriate must raise allreasonable issues of concern and submit all arguments and factualmaterials supporting their position during the public commentperiod. Any request for a public hearing shall state the nature ofthe proposed issues to be raised in the hearing. A public hearingwill be conducted if NJDEP determines there is a significant degreeof public interest. If a public hearing is held, the publiccomment period is automatically extended through the close of thehearing.

Richard DeWan, ChiefBureau of Standard PermittingCN-029Trenton, New Jersey 08625

April 5, 1995 DRAFT - FOR DISCUSSION PURPOSES ONLY

*act Sheet/BasisPermit No. NJ0025411Page 1 of 87 Pages

STATE OF NEW JERSEYDEPARTMENT OF ENVIRONMENTAL PROTECTION

DIVISION OF WATER QUALITY401 EAST STATE STREET

CN-029TRENTON, NEW JERSEY 08625

FACT SHEETFOR

DRAFT NJPDES PERMIT.RENEWAL

NJPDES Permit No. NJ0025411

Name and Address of Applicant;

Name and Address of FacilityWhere Discharge Occurs:

Receiving Water:

Classification:

DATE:

Public Service Electric andGas Company

80 Park PlazaP.O. Box 570Newark, New Jersey 07101

Hope Creek Generating StationArtificial IslandLower Alloways Creek TownshipSalem County, New Jersey

Delaware River

Zone5

0

DRAFT - FOR DISCUSSION PURPOSES ONLY

0@Fact Sheet/BasisPermit No. NJ0025411

Page 2 of 87 Pages

I. DESCRIPTION OF FACILITY

The above-named applicant has applied for a renewal of New Jersey

Pollutant Discharge Elimination System (NJPDES) permit Number

NJ0025411, to the State of New Jersey Department of Environmental

Protection (NJDEP), Division of Water Quality to discharge into the

designated receiving water.

The Hope Creek Generating Station (HCGS) is located on the

southwestern side of Artificial Island on the eastern shore of the

, Delaware River (River) in Salem County, New Jersey. HCGS lies

about 50 miles northwest of the mouth of the Delaware Bay and 30

miles southwest of Philadelphia (See Figure 1). The River in the

area of HCGS is approximately 2.5 miles wide. The tidal flow of

the River past HCGS is approximately 400,000 cubic feet per second

or 259,000 million gallons per day (MGD). A location map of the

facility is included as Figure 1.

I DRAFT - FOR DISCUSSION PURPOSES ONLY

0,act Sheet/BasisPermit No. NJ0025411Page 3 of 87 Pages

HCGS consists of one boiling water nuclear reactor with a net

electrical generating capacity of approximately 1,067 megawatts

which commenced commercial operation on December 20, 1986. HCGS

operates with a closed cycle cooling system which uses a natural

draft cooling tower. Makeup water is provided to the cooling tower

from the River and is returned to the River as cooling, tower

blowdown, with some evaporative losses to the atmosphere. The

Schematic of Water Flow is shown in Figure 2.

Condenser cooling water is treated to remove heat by circulation in

an evaporative natural draft, (counter current) cooling tower.

Sodium hydroxide is added to the cooling water to protect the tower

fill from chemical deterioration and sodium hypochlorite is added

to prevent biofouling of the condensers, the cooling tower, and

related equipment. A portion of the recirculated cooling water,

referred to as cooling tower blowdown, is continuously removed to

prevent solids buildup. The cooling tower blowdown is treated with

ammonium bisulfite, a dechlorinating agent, to reduce chlorine

residuals to permitted levels prior to discharge. Makeup water is

provided to the cooling tower from the Delaware River through the

DRAFT - FOR DISCUSSION PURPOSES ONLY

*act Sheet/BasisPermit No. NJ0025411Page 4 of 87 Pages

service water system to replace the water removed through blowdown

and. evaporative loss to the atmosphere. Cooling tower blowdown is

discharged through outfall DSN 461A.

DSN 461A is the largest discharge from HCGS, and primarily consists

of cooling tower blowdown (40.5 MGD) with minor waste .stream

contributions from the Low Volume and Oily Waste System (DSN 461C)

and liquid radioactive waste system (DSN 461B) as shown in Figure

3; Sediment which collects in the cooling tower basin is removed

as necessary and is disposed of at an onsite dredge spoil area.

The liquid radioactive waste system (DSN 461B) is a low volume

(0.042 MGD) wastewater source which mixes with the cooling tower

blowdown, prior to the DSN 461A monitoring point. The liquid

radioactive waste (LRW) system is designed to process liquid waste

streams from inside the power generation facilities that may

potentially contain radioactivity. The treatment system contains

all necessary equipment to meet both U.S. Nuclear Regulatory

Commission (USNRC) standards for the discharge of radioactivity and

I DRAFT' - FOR DISCUSSION PURPOSES ONLY

z act Sheet/BasisPermit No. NJ0025411Page 5 f 87 Pages

the applicable New Jersey State Water Quality Standards. The USNRC

has issued license number NPF-57 to the facility.

The Low Volume and Oily Waste (LVOW) System (DSN 461C) is an

internal monitoring point which combines with cooling tower

blowdown prior to the DSN 461A monitoring point. The LVOW System

collects and treats potentially oily wastewater from area,

building, and equipment drains throughout the site as well as the

auxiliary boiler blowdown and miscellaneous stormwater sources.

Collected waste streams are processed through an API-approved

oil/water separator as shown in Figure 4 where solid and floatable

materials are removed. Settleable solids are removed from the

waste stream by gravity separation and are transferred to the oily

sludge holding tank before being trucked off-site to a licensed

disposal facility. Oil and floatables removed by the separator are

.routed to the waste oil tank before being trucked off-site to a

licensed disposal facility. Treated effluent from the LVOW System

(0.06 MGD) is discharged to the Delaware River through DSN 461A.

DRAF.T - FOR DISCUSSION PURPOSES ONLY

*Fact Sheet/BasisPermit No. NJ0025411*Page 6 of 87 Pages

The North Yard Storm Drain (DSN 462A) collects precipitation runoff

and groundwater and discharges to the Delaware River (0.16 MGD).

Influents, as shown in Figure 5, include tidal waters, site

drainage from the facility, and construction and excavation

dewatering (primarily groundwater) regulated under a Water Allocation

Permit. The Salem Soil Conservation District reviews and approves

a soil erosion and sediment control plan for all construction

projects which disturb more than 5,000 square feet of land (or more

than 1,000 square feet of land within 25 feet of a stream bank).

The sewage treatment plant (DSN 462B) also discharges through this

*. outfall but is monitored independently. Due to facility elevations

and the proximity to the River, this outfall is tidally influenced.

The Sewage Treatment Plant (DSN 462B) treats sanitary wastewater

collected from the Salem and Hope Creek stations and administrative

facilities and sewage holding tank waste generated at unconnected

buildings onsite. Collected wastewaters receive secondary

treatment in a single channel oxidation ditch which oxidizes the

organic constituents of the influent wastewater. Solids are then

removed in two clarifiers with a portion of the sludge (biosolids)

DRAFT - FOR.DISCUSSION PURPOSES ONLY

Fact Sheet/BasisPermit No. NJ0025411Page 7 of 87 Pages

recycled back to the oxidation ditch. Clarifier effluent can then

be polished in sand filters for removal of any fine solids. Final

effluent (0.03 MGD) is chlorinated to destroy pathogenic organisms

prior to discharge to the Delaware River through DSN 462A as shown

in Figure 6. Excess biosolids from the clarification process are

stored temporarily in a sludge holding tank before final disposal

at an offsite licensed treatment or disposal facility.

The South Yard Storm Drain (DSN .463A) collects precipitation runoff

and groundwater and discharges to the Delaware River (0.19 MGD).

Influents, as shown in Figure 7, include tidal waters, site

drainage, chlorination structure drains, and construction and

excavation dewatering (primarily groundwater)regulated under a

Water Allocation Permit. The Salem Soil Conservation District

reviews and approves a soil erosion and sediment control plan for

all construction projects which disturb more than 5,000 square feet

of land (or more than 1,000 square feet of land within 25 feet of

a stream bank). Due to facility elevations and the proximity to

the River, this outfall is tidally influenced. The chlorination

structure drains from the sodium hypochlorite tank secondary

DRAFT - FOR DISCUSSION PURPOSES ONLY

*Fact Sheet/BasisPermit No. NJ0025411Page 8 of 87 Pages

containment and the chlorination control building are normally

isolated and residual chlorine shall be verified to be below

detection prior to release through this outfall.

The Perimeter Storm Drain (DSN 464) collects precipitation runoff

from several non-process areas on the Hope Creek site and access

roadways as well as natural drainage from the'adjacent marshes and

then discharges to the Delaware River, (0.23 MGD). Due to the

facility elevations and proximity to the River, this outfall is

also tidally influenced.

II. DESCRIPTION OF DRAFT PERMIT CONDITIONS

The proposed effluent limitations and other pertinent information

regarding the Draft Permit are described in the Permit Summary

Tables. Also included is a brief summary of the basis for each

effluent limitation and other conditions in the Draft Permit

(Statement of Basis).

IDRAFT - FOR DISCUSSION PURPOSES ONLY

eact Sheet/BasisPermit No. NJ0025411Page 9 of 87 Pages

III. VARIANCE OR MODIFICATION OF EXISTING PERMIT

None requested.

IV. WATER OUALITY BASED PERMIT LIMITS

The Department has determined that Water Quality Based Effluent

Limitations (WQBEL) are not the governing criteria at this time.

V. PROCEDURES FOR REQUESTING MODIFICATION OF A WATER OUALITY

BASED EFFLUENT LIMITATION

In accordance with N.J.A.C. 7:14A-9.6(d), any request for; a

modification to water quality based effluent limitations must be

submitted prior to the close of the public comment period.

Procedures for requesting a modification to a water quality based

effluent limitation are found in N.J.A.C. 7.9B-1.9 (New Jersey

Surface Water Quality Standards). Additional information may be

obtained from the Bureau of Surface Water Quality Standards, CN-

423, Trenton, New Jersey 08625, (609)633-1179.

DRAFT - FOR DISCUSSION PURPOSES ONLY

0 %act Sheet/BasisPermit No. NJ0025411

Page 10 of 87 Pages

VI. PROCEDURES FOR REACHING A FINAL DECISION ON THE DRAFT PERMIT

These procedures are set forth in N.J.A.C. 7:14A-7.i et scr.

Included in the public notice are requirements for the submission

of comments by a specified date, procedures for requesting a

hearing and the nature of the hearing, and other procedures for.

participation in the final Department decision.

. VI. NJDEP CONTACT

Additional information concerning the Draft Permit may be obtained

between the hours of 8:00 A.M. and 4:00 P.M., Monday through Friday

from: Flavian Stellerine, Bureau of Standard Permitting, at (609)

292-4860.

DRAFT - FOR DISCUSSION PURPOSES ONLY

act Sheet/Basis

Permit No. NJ0025411Page 11 of 87 Pages

FIGURE 1 LOCATION OF FACILITY (FROM APPLICATION)

DRAFT - FOR DISCUSSION PURPOSES ONLY

FI act Sheet/BasisPermit No. NJ0025411Page 12 of 87 Pages

FIGURE 2 SCHEMATIC OF WATER FLOW

DRAFT - FOR DISCUSSION PURPOSES ONLY

Oact Sheet/BasisPermit No. NJ0025411

Page.13 of 87 Pages

FIGURE 3 COOLING*TOWER BLOWDOWN

DRAFT - FOR DISCUSSION PURPOSES ONLY

*act Sheet/BasisPermit No. NJ0025411Page 14 of 87 Pages

FIGURE 4 LVOW TREATMENT SCHEMATIC

DRAFT - FOR DISCUSSION PURPOSES ONLY

*act Sheet/BasisPermit No. NJ0025411

PAge 15 of 87 Pages

FIGURE 5 NORTH YARD DRAIN SCHEMATIC DSN 462A

DRAFT - FOR DISCUSSION PURPOSES ONLY

tact Sheet/BasisPermit No. NJO025411

Page 16 of 87 Pages

FIGURE 6 STP TREATMENT SCHEMATIC - DSN 462B

IDRAFT - FOR DISCUSSION PURPOSES ONLY

tact Sheet/BasisPermit No. NJ0025411Page 17 of 87 Pages

FIGURE 7 SOUTH YARD DRAIN SCHEMATIC - DSN 463A

DRAFT - FOR DISCUSSION PURPOSES ONLY

Facility: Hope Creek Generating Station

Discharge Serial Number (DSN) 461A

Latitude: N 39' 285 15"

Longitude: W750 32' 30"

PERMIT SUMMARY TABLE DSN 461A

Permit No. NJ 0025411

Long Term Average Flow: 40.5 MGD

Wastewater Type: Non-contact cooling water and

effluent from LVOW and LRW

Receiving Stream: Delaware River

Classification:

River Basin:

Zone 5

Delaware

0PARAMETER NJPDES DMR FILES Existing Effluent Draft

All units in mg/I Application 01/01/94- NJPDES/DSW Limitation. Other Permitunless otherwise noted (1) 01/31/96 Permit Guideline Limitation

avg 31.47- .34.8 NL NLFlow (MGD) max 72.5 84.7 (2) NL - - - - NL

data pts continuous continuous continuous continuous

Influent Temperature avg 9.72/25.03 (3) 14.1 NL NLn °ut max - - - 30.3 NL --- --- NLdata pts continuous continuous continuous continuous

Effluent Temperature avg 18.96/28.70 (3) 21.1 NL NL

(0C) max 33.80/35.73 33.2 35.6 --- 36.2(4) 36.2data pts continuous -continuous continuous continuous

Heat Rate avg 161 NL NL

(Oct-May) (MBTU/HR) max --- 452 338 (5) --- 731 (5) 662data pts calculated calculated calculated (6)

Heat Rate avg 96 NL NL

(Jun-Sep) (MBTU/HR) max --- 193 238 (5) --- 443 (5) 534

data pts calculated calculated _calculated (6)

Total Residual Chlorine avg <0.05 <0.1i 0.2 0.2 0.2max 1.30 <0.1 0.5 0.5. --- 0.5

data pts 4380 continuous continuous continuous

Petroleum Hydrocarbons avg <0.12 NL 10(Net) max 1.0 10 15 N/A

data pts 25 2/month (7) (7) (7)

0.

OS 0

0 i

PERMIT SUMMARY TABLE DSN 461A (cont.)

PARAMETER NJPDES DMR FILES Existing Effluent DraftAll units in mg/I Application 01/01/94- NJPDES/DSW Limitation Other Permitunless otherwise noted (1) 01/31/96 Permit Guideline Limitation

Total Suspended Solids avg 47.5 63 NL - NLTned max 56 243 NL --- 100 NL(tdata pts 2(8) 25 2/month (11) 2/month

Total Organic Carbon avg 5.5 2.3 NL NL

(Net) max 25 17.0 20 --- --- 20data pts 146 (8) 25 2/month monthly

min 6.3 6.0 6 6.0 6.0pH (S.U.) max 9.8 9.0 9 9.0 --- 9.0

data pts 312 25 2/week weekly

Asbestos avg <1.37 NL

(pg/I) max <21.4 NL --- --- N/Adata pts 25 2/month

avg 0.37 0.1 NLPhosphorus max 0.39 0.7 NL --- --- N/A (9)

data pts 2 25 2/month

Copper avg 0.010 NLCper max 0.016 N/A 0.2 N/A(Net) (10) data pts 2(8) (10)

Zinc avg 0.034 NLmax 0.05 N/A 0.6 - N/A(Net) (10) data pts 2(8) (10)

Chromium avg 0.010 NL(Net) (10) max 0.018 N/A 0.2 N/A(data pts 2(8) 1 (10)

I.

PERMIT SUMMARY TABLE DSN 461A (cont.)

DSN 461A NOTES

The abbreviation "N/A" denotes "Not Applicable" while "NL" denotes "Not Limited" with monitoring and reporting required.

(1) Data from Form 2-C in NJPDES renewal application dated 3/30/90 and supplements dated 8/19191 and May, 1995.(2) Flow rate unusually high during commencement of plant outage, next highest daily maximum is 71.7 MGD.(3) Influent and effluent temperatures are continuously monitored and are represented as winter/summer values in the application.(4) The effluent temperature value of 36.2 C0 is based the a study entitled "Hope Creek Hydrothermal Studies" (June 21, 1994).(5) Interim Heat Rate limitations in accordance with the Administrative Consent Order dated January 11, 1990 are 731 MBTU/HR from October

through May and 443 MBTU/HR from June through September.(6) Heat Rate is calculated hourly based on continuous monitoring of influent temperature, effluent temperature, and flow. The seasonal limitations

are for June through August and September through May (NJAC 7:9B).

(7) No visible sheen (NJAC 7:14A-14).(8) NJPDES Application values are effluent gross values as required by the application.(9) If the permittee plans to use an anti-scalant containing phosphorus for cooling tower treatment, prior approval by the Department is required and

any limitations or conditions would be imposed at that time.(10) The existing permit requires sampling only if cooling tower maintenance chemicals containing these metals are used.

(11) Delaware River Basin Commission Water Quality Regulations.

0. .

AMLAM

MW

.PERMIT SUMMARY TABLE DSN 461C

Facility: Hope Creek Generating Station

Discharge Sedal Number (DSN) 461C

Latitude: N 390 28' 15"

Longitude: W 750 32' 30"

Permit No. NJ 0025411

Long Term Average Flow: 0.06 MGD

Receiving Stream: Delaware River

Classification:

River Basin:

Zone 5

DelawareWastewater Type: Effluent of the LVOW oil water separator

from area, building, auxiliary boiler and equipment drains

PARAMETER NJPDES DMR FILES Existing Effluent DraftAll units in mg/I Application 01/01/94- NJPDES/DSW Limitation Other Permitunless otherwise noted (1) 01/31/96 Permit Guideline Limitation

avg 0.062 0.05 NL NLFlow (MGD) max 0.37 0.21 0.45 NL

data pts continuous continuous continuous continuous

Temperature avg 24.7 19.4 NLmax 50.0 37.0 NL --- N/A

("C) data pts 384 25 weekly

- avg 10.82 5.7 30(2) 30Total Suspended Solids max 184 20 100 --- 1- 00

data pts 96 25 2/month _ _monthly

avg 11.43 9.7 NL NLTotal Organic Carbon max 400 32 50 -.-- 50

data pts 96 25 2/month monthly

avg 1.5 10 10Petroleum Hydrocarbon max --- 43 (3) 15 (4) 15 (4)

data pts 25 2/month monthly

min 6.10 7 6pH max 12.6 9 9 --- --- (5)(S.U.) data pts 384 25 weekly

Ammonia avg 1.6 0.22 35max 106 3 NL --- - N/A

data pts 96 25 2/month

0

PERMIT SUMMARY TABLE DSN 461C (cont.)

S

,-PARAMETER. NJPDES DMR FILES Existing Effluent DraftAll units in mg/I Application 01/01/94- NJPDES/DSW Limitation Other Permit

unless otherwise noted (1) 01/31196 Permit Guideline Limitation

avg - - - <0.02 NLCopper max 0.008 0.1 0.2 N/A

__data pts 1 25 2/month

avg - - - 1.2 NLIron max 0.76 11 NL N/A

I data pts 1 25 2/month

DSN 461(Q NOTES

(1) Data from Form 2-C in NJPDES renewal application dated 3/30/89 and supplement dated 8/19/91.

(2) TSS shall not exceed 45 mg/I as a 7-day average (DRBC).

(3) Refer to enforcement case no. 96-01-11-1525-42.

(4) And no visible sheen.

(5) pH shall be monitored, limited, and reported at the outfall of DSN 461A.

6@d

Facility: Hope Creek Generating Station

Discharge Serial Number (DSN) 462A

Latitude: N 390 28' 15"

Longitude. W 75° 32' 30"

PERMIT SUMMARY TABLE DSN 462A

Permit No. NJ 0025411

Long Term Average Flow: 0.16 MGD.

Wastewater Type: Effluent from DSN 462B,

stormwater and groundwater

Receiving Stream:

Classification

River Basin:

Delaware River

Zone 5

Delaware

PARAMETER NJPDES DMR FILES Existing Effluent DraftAll units in mg/I Application 01/01/94- NJPDES/DSW Limitation Other Permitunless otherwise noted (1) 01131/96 Permit Guideline Limitation (2)

avg 0.169 0.15 NLFlow (MGD) max --- 0.34 NL - --- N/A

data pts 45 25 monthly (3)

min 6.1 6.7 6.0pH (S.U.) max 8.5 8.7 9.0 --- - N/A

data pts 42 25 monthly (3)

avg 0.43 NL. 10Petroleum Hydrocarbons max --- 3.0 15 15 N/A

data pts 25 monthly (4) (4)

avg 4.2 9.3 NLTotal Organic Carbon max 5.0 31 50 -- - N/A

data pts 2 25 monthly (3)

avg 73.5 45 30(5)Total Suspended Solids max 80.0 248 100 --- --- N/A

data pts 2 25 monthly (6)

DSN 462A NOTES

(1) Data from Form 2-C in NJPDES renewal application dated 3/30/90 and supplement dated 8/19/91.

(2) Stormwater Pollution Prevention Plan requirements have been imposed in lieu of numerical limitations (see Permit Part IV-RF).

0 01

PERMIT SUMMARY TABLE DSN 462A (cant.)

DSN 462A NOTES (continued)

(3) During a discharge event.(4) During the first precipitation event of the month which causes a discharge during working hours and which is preceded by a minimum dry period

of 72 hours. The permittee shall take samples 15, 30 and 45 minutes after the onset of the discharge. The permittee shall analyze each sampleindividually and report a maximum value for the samples. Samples are multiple grab. There shall be no visible sheen.

(5) TSS shall not exceed 45 mg/I as a 7-day average (DRBC).(6) In accordance with the Administrative Consent Order dated January 11, 1990, Total Suspended Solids at this outfall must be monitored and

reported but the permittee is not required to meet the permit effluent limitations for Total Suspended Solids.

Facility: Hope Creek Generating Station

Discharge Serial Number (DSN) 462B

Latitude: N 39° 28' 15"

Longitude: W750 32' 30"

PERMIT SUMMARY TABLE DSN 462B

Permit No. NJ 0025411

Long Term Average Flow: 0.03 MGD

Wastewater Type: Sewage Treatment Plant Effluent

Receiving Stream: Delaware River

Classification:

River Basin:

Zone 5

Delaware

PARAMETER NJPDES DMR FILES Existing Effluent DraftAll units in mg/I Application 01i01/94- NJPDES/DSW Limitation Other Permit

unless otherwise noted (1) 01/31/96 Permit Guideline Limitation

avg 0.032 0.02 NL NLFlow (MGD) max 0.058 0.06 NL --- --- NL

data pts - - - daily daily daily

BOD-5 avg --- 2.0 6.8 (2) 8(3) 8max 6.4 NL NL

(kg/day) data pts 25 monthly monthly

..D. mrin ' 96.1 87.5 85 (4) - 87.5

B% avg --- 98.9 N/A N/A(% Removal) data pts 25 monthly "_monthly

FSOD avg 2.4 8.2 (2) 9.5max - - - 7.7 NL N/A

(kg/day) data pts 25 N/A (3)

avg 8.5 10.8 30 (5) 30 (5) 30 (5)Total Suspended Solids max 30.0 27.0 100 -- - 100 NL

data pts 12 25 monthly monthly

min - -- 96.7 85 85 (4) 85Total Suspended Solids mm 96.7 85 8(8avg 100.0 N/A - N/A

(% Removal) data pts 25 monthly monthly

F. Coliform avg 6.8 <1.0 200 200 (7) 200(MPN/100 ml) max 20.0 <1.0 400 • - - 400

data pts 12 25 monthly (6) monthly (6)

PERMIT SUMMARY TABLE DSN 462B (cont.)

PARAMETER I NJPDES DMR FILES Existing Effluent DraftAll units in mg/I Application 01/01/94- NJPDES/DSW Limitation Other Permitunless otherwise noted (1) 01/31/96 Permit Guideline Limitation

min 6.1 7.1 6.0 6 6.0pH (S.U.) max 7.9 8.3 9.0 9 9.0

data pts 365 25 2/week monthly (9)

avg 0.49 1.4 10 10 10Oil and Grease max 2.13 5.0 15 --- 15 15

data pts 12 25 monthly (8) (8) monthly (8)

avg 2.23 NLChlorine Produced Oxidants max 3.93 - -- NL

data pts 6 monthly (9)

DSN 462B NOTES

(1) Data from Form 2-C in NJPDES renewal application dated 3/30/90 and supplements dated 8/19/91 and May, 1995.

(2) The value of 8.2 kg/day FSOD is equivalent to 6.8 kg/day BOD-5.

(3) The FSOD allocation of 9.5 kg/day is assigned by the DRBC. FSOD is limited through the BODS parameter using the DRBC assigned ratio of

1.2:1.0.

(4) DRBC effluent quality requirement.

(5) And TSS shall not exceed 45 mg/I as a 7-day average (DRBC). This requirement is not applicable after completion of the discharge modification.

(6) The average shall be the geometric mean over a 30 consecutive day period and the maximum shall be the geometric mean over a 7-consecutiveday period.

(7) DRBC stream quality objective.

(8) And no visible sheen (NJAC 7:14A-14).

(9) The permittee is required to reroute the effluent from the Sewage Treatment Plant to discharge through DSN 461A. These parameters will not be

monitored or limited at this outfall following completion of this discharge modification.

0

es7-1 6@

Facility: Hope Creek Generating Station

Discharge Serial Number (DSN) 463A

Latitude: N 39' 28' 00"

Longitude: W750 32' 30"

PERMIT SUMMARY TABLE DSN 463A

Permit No. NJ 0025411

Long Term Average Flow: 0.19 MGD.

Wastewater Type: Stormwater and Groundwater

Receiving Stream: Delaware River

Classification: Zone 5

River Basin: Delaware

PARAMETER NJPDES DMR FILES Existing Effluent DraftAll units in mg/I Application 01/01/94- NJPDES/DSW Limitation Other Permitunless otherwise noted - (1) 01/31/96 Permit Guideline Limitation (2)

avg 0.205 0.17 NLFlow (MGD) max --- 0.4 NL - - - N/A

data pts 45 25 monthly (3) .....

min 6.2 6.5 6.0pH (S.U.) max 9.0 8.5 9.0 --- --- N/A

data pts 41 25 monthly (3)

avg 0.5 NL 10Petroleum Hydrocarbons max --- 2 15 - - - 15 N/A

data pts 25 monthly (4) (4)

avg 4.5 9.8 NLTotal Organic Carbon max 4.9 31 50 N/A

data pts 2 25 monthly (3)

avg 38 41 30(5)Total Suspended Solids max 59 88 100 --- --- N/A

data pts 2 25 monthly (6) 1

DSN 463A NOTES

(1) Data from Form 2-C in NJPDES renewal application dated 3/30/90 and supplement dated 8/19/91.

(2) Stormwater Pollution Prevention Plan requirements have been imposed in lieu of numerical limitations (see Permit Part IV-RF).

0

PERMIT SUMMARY TABLE DSN 463A (cont.)

DSN 463A NOTES (continued.

(3) During a discharge event.(4) During the first precipitation event of the month which causes a discharge during working hours and which is preceded by a minimum dry period

of 72 hours. The permittee shall take samples 15, 30 and 45 minutes after the onset of the discharge. The permittee shall analyze each sampleindividually and report a maximum value for the samples. Samples are multiple grab. There shall be no visible sheen.

* (5) TSS shall not exceed 45 mg/I as a 7-day average (DRBC).(6) In accordance with the Administrative Consent Order dated January 11, 1990, Total Suspended Solids at this outfall must be monitored and

reported but the permittee is not required to meet the permit effluent limitations for Total Suspended Solids.

0iI

@0 .#

Ii!

H.lii.

Facility: Hope Creek Generating Station

Discharge Serial Number (DSN) 464

Latitude: N 390 28' 15"

Longitude: W 750 32' 30"

PERMIT SUMMARY TABLE DSN 464

Permit No. NJ 0025411

Long Term Average Flow: 0.23 MGD

Wastewater Type: Stormwater and Groundwater

Receiving Stream: Delaware River

Classification: Zone 5

River Basin: Delaware

PARAMETER R NJPDES I DMR FILES Existing Effluent DraftAll units in mg/I Application 01/01/94- NJPDES/DSW Limitation Other Permitunless otherwise noted (1) 12/31/96 Permit Guideline Limitation (2)

avg 0.235 0.22 NLFlow (MGD) max --- 0.52 NL --- N/A

data pts 45 25 monthly (3)

min 6.0 6.7 6.0pH (S.U.) max 9.0 8.3 9.0 --- --- N/A

data pts 37 25 monthly (3)

avg 0.43 NL 10Petroleum Hydrocarbons max 2.0 15 15 N/A

data pts 25 monthly (4) (4)

avg 8.1 11.8 NLTotal Organic Carbon max 8.2 38.0 50 N/A

data pts 2 25 monthly (3)

avg 81 30 30(5)Total Suspended Solids max 133 153 100 N/A

data pts 2 25 monthly (6)

DSN 464 NOTES

(1) Data from Form 2-C in NJPDES renewal application dated 3/30/90 and supplement dated 8/19/91.

(2) Stormwater Pollution Prevention Plan requirements have been imposed in lieu of numerical limitations (see Permit Part IV-RF).

0-

PERMIT SUMMARY TABLE DSN 464 (cont.)

DSN 464 NOTES (continued)

(3) During a discharge event.(4) During the first precipitation event of the month which causes a discharge during working hours and which is preceded by a minimum dry period

of 72 hours. The permittee shall take samples 15, 30 and 45 minutes after the onset of the discharge. The permittee shall analyze each sampleindividually and report a maximum value for the samples. Samples are multiple grab.

(5) TSS shall not exceed 45 mg/las a 7-day average (DRBC).(6) In accordance with the Administrative Consent Order dated January 11, 1990, Total Suspended Solids at this outfall must be monitored and

reported but the permittee is not required to meet the permit effluent limitations for Total Suspended Solids.

qact Sheet/BasisPermit No. NJ0025411Page 31 of 87 Pages

STATEMENT OF BASIS

DRAFT NJPDES PERMIT TO

DISCHARGE INTO THE WATERS OF

THE STATE OF NEW JERSEY

NJPDES Application No. NJ0025411

UNDERSTANDING THE DEVELOPMENT OF EFFLUENT LIMITATIONS AND

MONITORING REQUIREMENTS

Permit effluent limitations, monitoring requirements, and other

conditions are authorized by the Federal Water Pollution Control

Act (33 U.S.C. 1251 2t a_2.), also known as the Clean Water Act,

and the State Water Pollution Control Act (N.J.S.A. 58:10A-1 et

sea_.). These statutes are implemented by the National Pollutant

Discharge Elimination System (NPDES) (40 CFR Part 122) and New

Jersey Pollutant Discharge Elimination System (NJPDES) (N.J.A.C.

7:14A-1 et. sea-) permit programs.

Effluent limitations are developed by the following three methods:

DRAFT - FOR DISCUSSION PURPOSES ONLY

*Fact Sheet/Basis

Permit No. NJ0025411Page 32 of 87 Pages

1. TECHNOLOGY BASED LIMITATIONS

Technology based limitations are authorized by Section 301 of the

Clean Water Act, 40 CFR 122, N.J.S.A. 58:10A-4, and N.J.A.C. 7:14A-

3.13a(I) . In general, effluent limitations are based on Effluent

Limitation Guidelines (ELGs) developed by the United States.

Environmental Protection Agency (USEPA), or on Best Professional

Judgment (BPJ) in cases where ELGs are not available or not

appropriate. ELGs are minimum technology, based requirements

applicable on a nation-wide basis. They consider the category of

0 industry which produces pollutants taking into account the specific

factors unique to a particular type of industry (manufacturing

process, type and quantity of pollutants generated, types of

treatment facilities available to treat the pollutants, etc). ELGs

are published in 40 CFR Subchapter N. The Steam Electric Effluent

Limitations Guidelines are published in 40 CFR Part 423. BPJ

determinations are authorized by Section 402(a) (1) of the Clean

Water Act.

2. WATER QUALITY BASED EFFLUENT LIMITATIONS

DRAFT - FOR DISCUSSION PURPOSES ONLY

WF act Sheet/Basis

Permit No. NJ0025411Page 33 of 87 Pages

Water Quality Based Effluent Limitations (WQBELs) are imposed when

it has been determined that limitations more stringent than

technology based effluent limitations are required to meet water

quality standards. WQBELs are authorized by Section 301 of the

Clean Water Act, 40 CFR 122, N.J.S.A. 58:10A-4, and N.J.A.C. 7:14A-

3.13a(4), and are developed to assure compliance with the New

Jersey Surface Water Quality Standards, N.J.A.C. 7:9B-1 et _.,

and the Federal Water Quality Standards, 40 CFR Part 131. The

policies used to develop WQBELs are contained in the State and

Federal standards and guidance. Specific procedures,

methodologies, and equations are contained in the current USEPA

"Technical Support Document for Water Quality-based Toxics Control"

(EPA-505/2-90-001).

The Department is currently developing a watershed-based approach

to WQBELs for pollutants, including toxic pollutants. Until such

time as those limitations are developed for Zone 5, toxic pollutant

limitations for most dischargers are determined using technology

based limitations and miscellaneous effluent requirements along

with a whole effluent toxicity limitation, when necessary. In

DRAFT - FOR DISCUSSION PURPOSES ONLY

*act Sheet/BasisPermit No. NJ0025411Page 34.of 87 Pages

addition, WQBELs for toxic pollutants from most dischargers will be

imposed and/or revised as necessary when Total Maximum Daily Loads

(TMDLs) are-developed on a watershed specific basis. Additionally,

where appropriate, the permittee is required to conduct a pollutant

reduction study to determine various source. reduction options,

treatment options, and associated costs that would reduce the

levels of toxic pollutants.

3. MISCELLANEOUS EFFLUENT REQUIREMENTS

DRAFT - FOR DISCUSSION PURPOSES ONLY

*act Sheet/BasisPermit No. NJ0025411Page 35 of 87 Pages0

Miscellaneous effluent requirements, such as the minimum treatment

requirements in N.J..A.C. 7:9-5, are authorized by Section 301 of

the Clean Water Act, 40 CFR 122, N.J.S.A. 58:10A-4, and N.J.A.C.

7:14A-3.13a(2). Miscellaneous effluent limitations and conditions

may be required by other federal, state or regional statutes and

regulations. Some of these are:

1. New Jersey Surface Water Quality Standards

(N.J.A.C. 7:9-4)

2. Oil and Grease Effluent Limitations

(N.J.A.C. 7:14A-14)

3. Wastewater Discharge Requirements

(N.J.A.C. 7:9-5)

4. Requirements of the following:

Delaware River Basin Commission (N.J.A.C. 7:9-4.5(b)i)

DRAFT - FOR DISCUSSION PURPOSES ONLY

tact Sheet/BasisPermit No. NJ0025411Page 36 of 87 Pages

DESCRIPTION OF LIMITATIONS AND CONDITIONS

1. DSN 461A - Cooling Tower Blowdown

Conditions for EFFLUENT FLOW are consistent with the existing

permit, in accordance with the provisions set forth in N.J.A.C.

7:14A-3.13'(a) (12)i and are applied pursuant to the fee calculation

requirements in N.J.A.C. 7:14A-1.8 et. s and N.J.A.C. 7:14A-

3.13(a)9.i. (2) et. s .. Monitoring for effluent flow is required

continuously by meter. The permittee has provided acceptable

backup monitoring methodologies in the application for reporting

during maintenance, calibration or inoperability of the continuous

monitor including an installed float meter, manual measurement of

the height over the weir once per shift, or a calculation based on

the difference between intake flow and estimated evaporative

losses. Daily maximum and monthly average effluent flow in units

of Million Gallons per Day (MGD) shall be reported.

Conditions for INFLUENT TEMPERATURE are consistent with the

existing permit in accordance with the provisions set forth in

8DRAFT - FOR DISCUSSION PURPOSES ONLY

T act Sheet/BasisPermit No. NJ0025411Page 37 of 87 Pages

N.J.A.C. 7:14A-3.13(a) (12)i and to provide the data required to

calculate Heat Rate. The permittee has provided acceptable backup

monitoring methodologies in the application for reporting during

maintenance, calibration or inoperability of the continuous monitor

including a temporary monitoring device or manually obtaining

temperature once per shift. Continuous monitoring with daily

maximum and monthly average reporting is required.

Conditions for EFFLUENT TEMPERATURE AND HEAT RATE have been

modified from the existing permit consistent with the requirements

of 33 U.S.C. 1342(o), 40 CFR 122.44 and N.J.A.C. 7:14A-3.13(a)12.

The terms and conditions of the existing permit were developed and

imposed prior to the Station's beginning operation in 1986. The

permit required that Hope Creek operate with a closed cycle cooling

water system and imposed effluent limitations on the cooling tower

blowdown discharge based, in large part, on the generic. design

characteristics for the type of cooling tower proposed for

installation.

In 1990, the Permittee entered into an Administrative Consent Order

(ACO) with the Department to resolve, among other matters, certain

violations of the effluent temperature and heat limitations from

DRAFT - FOR DISCUSSION PURPOSES ONLY

* Fact Sheet/BasisPermit No. NJ0025411tPage 38 of 87 Pages

DSN 461A, the cooling tower blowdown discharge. In connection with

the establishment of the terms and conditions of the ACO, the

permittee presented the information and data to the NJDEP which

had been used to develop the pre-operational permit limits. A

review of this data suggested that -the limits were based on the

efficiency of the cooling tower under average meteorological

conditions and certain station operating conditions. As a

result, the NJDEP established interim limits in the ACO for Heat

Rate but required a year long study of the actual cooling tower

blowdown relative to various meterological and plant operating

conditions to confirm the initial conclusions and to determine

, appropriate limits based on the efficiency of the cooling tower.

The permittee submitted the results of the cooling tower blowdown

study to the NJDEP in 1991. This study concluded that under

certain meteorological and plant operating conditions, the cooling

tower performance was such that the limits in the existing permit

could not be met.

In connection with the development of a supplement to its permit

renewal application, the permittee commissioned an additional study

of the effects of meteorological conditions which have occurred at

IDRAFT - FOR DISCUSSION PURPOSES ONLY

*act Sheet/BasisPermit No. NJ0025411Page 39 of 87 Pages

the site on cooling tower performance under varying operating

conditions. This study concluded that meteorology and intake flow

have the greatest effect on the Heat Rate and the Effluent

Temperature. Based on the results of this study, the permittee has

proposed less stringent limitations for Effluent Temperature and

seasonal Heat Rate. In addition, the permittee commissioned a

study to determine whether the proposed effluent limitations it was

seeking would result in compliance with applicable water quality

standards for temperature. The results of a mathematical computer.

model depicting the thermal discharge demonstrated that even with

the proposed limits, the thermal plume from Hope Creek Generating

Station does not exceed 1.50 FA.T from June through August or 40 F

AT from September through May at the edge of the Heat Dissipation

Area designated for thermal discharges from Hope Creek. The Heat

DRAFT - FOR DISCUSSION PURPOSES ONLY

act Sheet/BasisPermit No. NJ0025411Page 40 of 87 Pages

Dissipation Area designated for thermal discharges from Hope Creek

is defined as a rectangle extending 2500 feet upstream or

downstream and 1500 feet off shore from the point of discharge.

This HDA complys with DRBC'.s HDA for thermal discharges into Zone

5 of the Delaware River as found in Section 4.30.6 of the DRBC

Water Quality Regulations.

The Department. is proposing a limitation of 36.20 C (97.1 'F) for

EFFLUENT TEMPERATURE and seasonal HEAT RATE limitations of 662

MBTU/hr from September through May and 534 MBTU/hr from June

through August from this outfall. The proposed effluent

limitations are based on the results of a study entitled "Hope

Creek Hydrothermal Studies" prepared by J.E. Edinger Associates,

Inc, dated June 21, 199•4. Proposing these limits is in accord with

the anti-backsliding provisions of federal and state law for the

following reasons:

(1) the permittee has installed a natural draft cooling tower with

the design contemplated at the time the existing permit limits were

established and has properly operated and maintained the cooling

tower. Nonetheless, the permittee has been unable to achieve

compliance with the limitations imposed due primarily to

DRAFT - FOR DISCUSSION PURPOSES ONLY

tact Sheet/BasisPermit No. NJO025411Page 41 of 87 Pages

meteorological conditions, which are clearly beyond the permittee's

control (SeeN.J.A.C.7:14A-3.13(a)12.ii. (1) ,40CFR 122.44(1) (2) (i) (C)

and 33 U.S.C. '1342 (o) (2) (E));

(2) Moreover, the actual operating data demonstrate that the

cooling tower can not achieve the limitations imposed in the

initial permit under meteorological conditions typical in the area

of the Station at any level of station operating conditions.

Therefore, if the operating data been available at the time of

initial operation, alternative limitations would have been

justified. (See 33 U.S.C. 1342 (o) (2) (B) (i) and 40 CFR

122.44(l) (2) (i) (B) (1));

(3) The various studies that PSE&G has conducted since 1990 have

concluded that meteorological conditions, over which the permittee

has no control, affect the efficiency of the cooling tower and

justify the imposition of less stringent permit limitations. (See

33 U.S.C. 1342 (o) (2) (C) and 40 CFR 122.44 (1) (2) (i) (C)) ; and

(4) Finally, the permittee has demonstrated to the Department's

satisfaction that the thermal plume from the Station with the

proposed limitations will be in compliance with all applicable

DRAFT - FOR DISCUSSION PURPOSES ONLY

Tact Sheet/BasisPermit No..NJ0025411Page 42 of 87 Pages

surface water quality standards within the Heat Dissipation Area

(2500' by 1500') designated by the DRBC. (See 33 U.S.C. 1342

(o)(3)).

EFFLUENT TEMPERATURE shall be monitored continuously. The-

permittee has provided acceptable backup monitoring methodologies

for reporting during maintenance, calibration or inoperability of

the continuous monitor including the temperature detector located

at the dechlorination system inlet, a temporary continuous

temperature monitor, or manual sampling once per shift. A daily

maximum limitation of 36.2 0C (97.1 0 F) has been imposed and the

monthly average value shall be reported. A footnote has been

included in Part III-B/C, Page.2 of 6 pages, the Effluent

Limitations Table for DSN 461A, which addresses the reporting of

the daily maximum and monthly average values based on continous

monitoring.

The HEAT RATE shall be calculated daily as the product of heat

capacity, discharge flow, and discharge-intake temperature

difference. A daily maximum limitation of 534 Million British

Thermal Units per Hour (MBTU/Hr) from June through August and 662

DRAFT - FOR DISCUSSION PURPOSES ONLY

*act Sheet/BasisPermit No. NJ0025411Rage 43 of 87 Pages

MBTU/Hr from September through May have been imposed. The time

periods designated as summer and winter have been changed to

correspond with the seasonal time periods in the State Surface

Water Quality Criteria (N.J.A.C. 7:9B-14).

DRAFT - FOR DISCUSSION PURPOSES ONLY

*act Sheet/BasisPermit No. NJ0025411Page 44 of 87 Pages

TOTAL RESIDUAL CHLORINE (TRC) will be expressed as CHLORINE

PRODUCED OXIDANTS (CPO). Since CPO is equivalent to TRC in

accordance with N.J.A.C. 7:9B-1 et. s , 'the effluent limitations

are consistent with the existing. permit in accordance with the.

provisions set forth in N.J.A.C. 7:14A-3.13(a) C12)i. The effluent

limitations are based on the ELGs for the Steam Electric catagory

(40 CFR 423). CPO shall be limited to a daily maximum of 0.5 mg/l

and a monthly average of 0.2 mg/l and shall be monitored three

times per week using a grab sample.

* Effluent limitations and conditions for pH are: based on the ELGs

for the Steam Electric catagory (40 CFR 423) and are consistent

with the existing permit in accordance with the provisions set

forth in N.J.A.C.' 7:14A-3.13(a) (12)i. The daily minimum pH of the

effluent shall not be less than 6.0 Standard Units (SU) and the

daily maximum pH shall not be greater than 9.0 SU. Based on the:

values reported on the Discharge Monitoring Reports demonstrating

consistent compliance with the limitations (see Permit Summary

Tables),. monitoring for pH hasbeen reduced from twice per week to

weekly. Monitoring shall be performed using a grab sample

DRAFT - FOR DISCUSSION PURPOSES ONLY

pact Sheet/BasisPermit No. NJ0025411Page 45 of .87 Pages

The existing permit requires that the discharge comply with a daily

maximum limitation of 15 mg/l and a monthly average limitation of

10 mg/l for PETROLEUM HYDROCARBONS in accordance with N.J.A.C.

7:14A-14.4. A review of the effluent sample results over the past

two years reveals that the discharge consistently complies with, the

existing permit limitations with reported values all less than

1 mg/l. The Discharge. Monitoring Report .(DMR) results are

presented in the Permit Summary Tables in the Fact Sheet. Due to

the nature of operations involved at the site and the effluent

sample results, the discharge has a low potential to exceed the

existing permit limitations. In additions, as a new outfall in

1985, petroleum hydrocarbon data was not available at the time of.

issuance of the existing permit. For these reasons, this draft

permit proposes to delete the limitations and monitoring conditions

for petroleum hydrocarbons, in accordance with 40 CFR

122.44(1) (2) (i) (B) (1). However, the effluent shall not exhibit a

visible sheen during discharge.

Effluent limitations and conditions for TOTAL ORGANIC CARBON (TOC)

are consistent with the existing permit in accordance with the

DRAFT - FOR DISCUSSION PURPOSES ONLY

*Fact Sheet/BasisPermit No. NJ0025411Page 46 of 87 Pages

provisions set forth in N.J.A.C. 7:14A-3.13(a) (12)i and are imposed

to determine the potential oxygen demanding characteristics of the

discharge. Based on the values reported on the Discharge

Monitoring Reports demonstrating consistent compliance with the

limitations, the monitoring frequency for TOC has been reduced

from twice per month to monthly. The daily maximum limitation of

.20 mg/1 NET is retained and the monthly average net value shall be

reported. The net value is determined as follows:

Net Conc. = (Eff Conc)x(Eff Flow) - (Inf Conc)x(Inf Flow)Effluent Flow

Effluent conditions for ASBESTOS were imposed in the current permit

to develop a database since portions of the cooling tower contain

asbestos. The analyses conducted and reported on the Discharge

Monitoring Reports (as shown on the Permit Summary Tables in the

Fact Sheet) for the last two years demonstrate that there is no

addition of asbestos from the cooling tower materials into-the

discharge with all reported values less than the Method Detection

DRAFT - FOR DISCUSSION PURPOSES ONLY

*Fact Sheet/BasisPermit No. NJ0025411Page 47 of 87 Pages

Level (MDL) Therefore, monitoring for this parameter is no longer

required. There is no State Water Quality Standard for asbestos in

the receiving waters.

The existing permit authorizes the use. of an anti-scalant

containing PHOSPHORUS in the Cooling Tower System. At the present

time, the permittee is not adding this antiscalant, but may require

future additions to protect the mechanical integrity of the Cooling

Tower system. The renewal permit has been strutured so that if

anti-scalant addition is required in the future, the permittee

shall notify the Bureau of Standard Permitting prior to the-use of

an anti-scalant chemical containing phoshorus. Upon approval from

the Department, the permittee shall be allowed to add the anti-

scalant containing phosphorus and will be required to monitor and

report the phosphorus concentration at DSN 461A. Monitoring shall

be conducted monthly by grab sample. ..Please refer to Part III-B/C,

Section 3 for further clarification of this condition of the

permit.

DRAFT - FOR DISCUSSION PURPOSES ONLY

*Fact Sheet/BasisPermit No. NJ0025411Page 48 of 87 Pages

Limitations and conditions for ZINC, COPPER and CHROMIUM in the

current permit were imposed to allow the use of cooling tower

maintenance chemicals containing these metals in accordance with 40

CFR Part 423. Since cooling tower maintenance chemicals containing

these metals are not used currently, and. are not anticipated to be

used in the future, these limitations and conditions are deleted.

Part III-B/C, Section 3 establishes a procedure for notifying the

Bureau of Standard Permiting if any additional. cooling tower

maintenance chemicals will be used in the future than those

currently used in the system. The permit may be reopened to

incorporate any additional limitations or conditions the Department

deemed necessary.

The Permittee has monitored for TOTAL SUSPENDED SOLIDS (TSS) in the

influent and effluent of the cooling tower system by grab sample

during the term of the existing permit. The data collected,

however, does not provide an adequate basis for determining the

change in TSS through the cooling tower system. In order to allow

the Department to assess more comprehensively the permittee's

discharge of TSS and the need for additional restrictions on TSS,

DRAFT - FOR DISCUSSION PURPOSES ONLY

*Fact Sheet/BasisPermit No. NJ0025411Page 49 of 87 Pages

additional data is required. The Permittee, therefore, is being

required to perform a cooling tower system TSS study to determine

if the cooling tower system is measurably changing the volume of

total solids from the influent. TSS analyses shall be performed in

accordance with the methods approved at 40 CFR 136. The Permittee

shall submit a report of the Study to the Department. After a

review of the Report, and consistent with State and Federal

regulations (see generally 40 CFR 122.44 and N.J.A.C. 7:14A.1), the

Department will determine whether additional permit limitations or

conditions are appropriate.

The permittee is required to perform an Acute Toxicity

Characterization Study and a Chronic Toxicity Characterization

Study as explained in Section 5 of this Statement of Basis, Special

Permit Conditions. Requirements for a Dilution Study are also

discussed in Section 5.

DRAFT - FOR DISCUSSION PURPOSES ONLY

AFact. Sheet/BasisPermit No. NJ0025411

Page 50 of 87 Pages

2. DSN 461C -Low Volume and Oily Waste System

Conditions for FLOW are consistent with the existing permit in

accordance with the provisions set forth in N.J.A.C. 7:14A-

3.13(a) (12)i and are applied pursuant to the fee calculation

requirements in N.J.A.C. 7:14A-1.8 et. s and N.J.A.C. 7:14A-.

3.13 (a)9.i. (2) et.* se Flow shall be continuously monitored by

meter. The daily maximum flow limitation of 0.45 MGD in the

existing permit was applied based on Best Professional Judgement

considering system design. A review of the effluent monitoring

results does not show any correlation to effluent flow volumes.

The limiting factor for flow capacity of the system is the ability

to provide adequate treatment to meet effluent limitations. Due to

the nature of operations involved at the site and the effluent

sample results, a limitation on effluent flow is not necessary. For

these reasons, this draft permit proposes to delete the the

limitations for effluent flow in accordance with 40 CFR

122.44(1) (2) (i).(B). Monthly average reporting shall be required.

The permittee has provided adequate backup monitoring methodologies

in the application for reporting during maintenance, calibration or

DRAFT - FOR DISCUSSION PURPOSES ONLY

S pact Sheet/BasisPermit No. NJ0025411Page 51 of 87 Pages

inoperability of the continuous monitor including calculations

based on the lift station pump operating hours or lift station

pumping events.

Monitoring requirements for EFFLUENT.TEMPERATURE were imposed in

the current permit to establish a database to determine whether

limitations were necessary at this internal monitoring point.

Based on the review of the Discharge Monitoring Reports containing

over two years of data and the comingling of the effluent from DSN

O 461C with the cooling tower blowdown (DSN 461A) prior to DSN 461A

temperature measurement, monitoring for effluent temperature has

been deleted at this internal monitoring point.

The effluent limitations of 10 mg/l as a monthly average and 15

mg/l as a daily maximum and conditions for PETROLEUM HYDROCARBONS

are carried over from the existing permit in accordance with

N.J.A.C. 7:14A-3.13(a) (12)i and N.J.A.C. 7:14A-14.1, et sea.,

entitled "Oil and Grease Effluent Limitations." The sample shall

be collected as a grab sample.

DRAFT - FOR DISCUSSION PURPOSES ONLY

kFact Sheet/BasisPermit No. NJ0025411Page 52 of 87 Pages

Effluent limitations and conditions for TOTAL ORGANIC CARBON (TOC)

are carried over from the existing permit in accordance with the

provisions set forth in N.J.A.C. 7:14A-3.13(a) (12).i and are imposed

to determine the potential oxygen demanding characteristics of the

discharge. The samples shall be collected as composite samples.

The monitoring frequency has been reduced from twice per month to

monthly based on a review of the DMR data (see permit Summary

Tables in the Fact Sheet) demonstrating consistent compliance with

the limitations. A daily maximum limitation of 50 mg/l is imposed

and reporting of a monthly average is also required.

Effluent limitations and conditions for TOTAL SUSPENDED SOLIDS

(TSS) are carried over from the existing permit in accordance with

N.J.A.C. 7:14A-3.13(a)(12)i. DSN 461C is a low volume waste source

pursuant to 40 CFR Part 423 and the limitations are consistent with

that section. Samples shall be collected as composite samples. The

monitoring frequency has been reduced from twice per month to

monthly based on a review of the DMR data (see permit Summary

Tables in the Fact Sheet) demonstrating consistent compliance with

the limitations. The limitations imposed are a monthly average of

DRAFT - FOR DISCUSSION PURPOSES ONLY

Fact Sheet/BasisPermit No. NJ0025411Page 53 of 87 Pages

30 mg/l and a daily maximum of 100 mg/l. The seven-day average of

45 mg/l originally imposed in the existing permit based on DRBC

Water Quality requirements has been eliminated in this renewal

permit in. accordance with 40 CFR 122.44(1) (2) (i) (B) (2). The seven-

day average limitation of i45 mg/l is an effluent quality

requirements as found in Section 3.10.4 of the DRBC Water Quality

Regulations and applies to a direct discharge to surface waters,

and is therefore not applicable to the DSN 461C internal monitoring

point.

PH shall not be less than 6.0 standard units nor greater than 9.0

standard units as monitored and reported for outfall DSN 461A.

USEPA regulations and guidance, including the combined wastestream

rule, allow mixing a low volume wastestream such as DSN 461C with

cooling water effluents in order to utilize the natural buffering

capacity of the cooling water, as long as the final discharge at

the cooling water outfall (DSN 461A) complies with the pH

limitation. Therefore, pH monitoring is not required at DSN 461C.

Effluent limitations and conditions for AMMONIA in the current

DRAFT - FOR DISCUSSION PURPOSES ONLY

*Fact Sheet/BasisPermit No. NJ0025411Page 54 of 87 Pages

permit were based-on the DRBC Water Quality Regulations. Since

this is an internal monitoring point which does not directly

discharge to surface water, this limitation is not appropriate.. In

addition, review of the Discharge Monitoring Reports show no

exceedances of the existing limitation of 35 mg/l, with the highest

reported value of 3 mg/l. .Therefore, based on the inappropriate

application of. the DRBC effluent limitation at an internal

monitoring point, and review of-ammonia data submitted since the

issuance of the existing permit, in accordance with 40 CFR

(1) (2) (B) (1) and (2), the effluent limitations and monitoring

conditions for this parameter have been eliminated in this.renewal

permit.

Effluent limitations and conditions for COPPER in the current

permit were imposed based on the DRBC Effluent Quality

Requirements. The limits are water-quality based requirements.and

they are not appropriately applied at DSN 461C, an internal

monitoring point. The Low Volume and Oily Waste System does not

treat metal cleaning wastes and therefore the Steam Electric

Effluent Limitations Guidelines (40 CFR 423) are not applicable to

DRAFT - FOR DISCUSSION PURPOSES ONLY

t0act Sheet/BasisPermit No. NJ0025411Page 55 of 87 Pages*

this discharge. Based on the inappropriate application of the DRBC

effluent limitations at an internal monitoring, and review of

effluent data that indicates that copper is routinely not detected

in this outfall, the effluent limitations and monitoring

requirements have been eliminated in this renewal permit in

accordance with 40CFR (l)(2).(B)(1) and (2).

Monitoring requirements for IRON were imposed in the current permit

to establish a database. Based on the absence of a State Water

Quality Standard for iron, monitoring for iron has been deleted.

3. DSN 462B -. Sewage Treatment Plant

The Sewage Treatment Plant-ý discharge, DSN 462B, currently

discharges through the North Yard Drain outfall, DSN 462A. The

permittee has proposed rerouting the existing sewage treatment

plant effluent to discharge through the cooling tower blowdown

outfall, DSN 461A. This rerouting would provide additional

treatment, e.g. residual chlorine would be removed prior to

discharge through reaction with the cooling tower blowdown

DRAFT - FOR DISCUSSION PURPOSES ONLY

S*act Sheet/BasisPermit No. NJ00254.11Page 56 of 87 Pages

dechlorination chemical, ammonium bisulfite. The. Department

supports this rerouting proposal as it provides treatment without

additional chemical additions. The rerouting is anticipated to

require one year to complete. The Department is proposing

alternate effluent limitations and monitoring requirements for the

Sewage Treatment Plant effluent upon completion of the discharge

rerouting to those appropriate for an internal waste stream. The

permittee is required to complete the discharge rerouting no later

than EDP + one (.1) year. If the discharge rerouting is completed

earlier than required, the permittee shall notify the Department

and the alternate effluent limitations and monitoring conditions

will apply at that time.

Conditions for FLOW are consistent with the existing permit in

accordance with the provisions set forth in N.J.A.C. 7:14A-

3.13 (a) (12) i and are applied pursuant to the fee calculation

requirements in N.J.A.C. 7:14A-1.8 et. s and N.J.A.C. 7:14A-

3.13(a)9.i. (2) et. sea.. Flow shall be monitored by measuring

height over the effluent weir and recorded on a daily basis. The

daily maximum flow and monthly average flow shall be reported in

DRAFT - FOR DISCUSSION PURPOSES ONLY

act Sheet/BasisPermit No. NJ0025411Page 57 of 87 Pages

MGD. The permittee has provided adequate backup monitoring

methodologies in the application for reporting during maintenance,

calibration or inoperability of the continuous monitor including

the manual measurement of height of flow over the weir once per

shift. There is no change to these requirements after the

discharge rerouting is completed.

Effluent limitations and conditions for OIL AND GREASE are carried

over from the existing permit in accordance with N.J.A.C. 7:14A-

3.13(a) (12)i and N.J.A.C. 7:14A-14.1, 2L sea., entitled "Oil and

Grease Effluent Limitations." The sample shall be collected as a

grab sample and reported in units of mg/l. Monitoring frequency

shall be monthly. The monthly average limitation of 10 mg/l and

the daily maximum limitation of 15 mg/l have been retained. There

is no change to these requirements after the rerouting of the

discharge is complete.

The effluent limitation for carbonaceous (first stage) oxygen

demand (FSOD)has been increased from 8.2 kg/day (18 lbs. per day)

to 9.5 kg/day (21 lbs/day) based on the combined allocation

DRAFT - FOR DISCUSSION PURPOSES ONLY

Fact Sheet/BasisPermit No. NJ0025411Rage 58 of 87 Pages

assigned by the Delaware River Basin Commission (DRBC) in a letter,

dated September 23, 1987. PSE&G requested the combined allocation

in a letter, dated September 11, 1987, based on the proposed

construction of a new 'oxidation ditch method' sewage treatment

plant (STP) at that time to serve both generating stations. The

existing STPs at each generating station were to be taken out of

service upon start-up of the new STP. This FSOD allocation is

equivalent to 8 kg/day (17.5 lbs/day) biochemical oxygen demand

(BOD.)based on the ratio of FSOD to BOD of 1.2 assigned by the DRBC

in the September 23, 1987 letter. Since FSOD and BOD, are

equivalent and BOD, is the parameter analyzed, BQ_ will be the

limited parameter. The monthly average effluent limitation for BOD,

is 8 kg/day (17.5 lbs/day) based on the DRBC allocation and the

daily maximum value shall be reported. Monitoring shall be

conducted monthly using composite samples. Composite samples are

specified to ensure representative samples are collected. There is

no change to these requirements after the rerouting of the

discharge is completed. The increase in the FSOD allocation and

BOD, effluent limitation are consistent with N.J.A.C. 7:14A-

3.13(a) (12)ii(3) as the construction of the oxidatation ditch STP

DRAFT - FOR DISCUSSION PURPOSES ONLY

'*Fact Sheet/BasisPermit No.. NJ0025411Page 59 of 87 Pages

to serve both generating stations constitutes a material and

substantial change at the facility from the issuance of the

existing permit..

Effluent limitations and conditions for Percent Removal of BOD5 are

carried over from the existing permit in accordance with N.J.A.C.

7:14A-3.13 (a) (12)i and, the DRBC Docket Decision D-87-70. The

monthly minimum limitation of 87.5% has been retained based on the

DRBC Effluent Quality Requirements and DRBC Docket Decision D-87-

70. Monitoring shall be performed monthly by calculation.

Influent monitoring by composite sample will be required to perform

this calculation. There is no change to these requirements after

the rerouting of the discharge is completed.

Effluent limitations and conditions for TOTAL SUSPENDED SOLIDS

(TSS) are carried over from the existing permit in accordance with

N.J.A.C. 7:14A-3.13(a) (12)i and are based on the DRBC Effluent

Quality Requirements. at section 3.10.4.D.l.a.l. Monitoring shall

be perfornled monthly as a composite sample and reported in units of

DRAFT - FOR DISCUSSION PURPOSES ONLY

*act Sheet/BasisPermit No. NJ0025411Page 60 of 87 Pages

mg/l. The limitations imposed are a monthly average of 30 mg/l and

a seven-day average of 45 mg/i. The daily maximum limitation of

100. mg/l has been deleted based on the DRBC Effluent Quality

Requirements at section 3.10.4.D.1.a.2 as DMR data indicates that

the effluent has not exceeded a TSS value above 45 mg/l which would

have warranted the imposition of the 100 mg/i effluent limitation.

After completion of the rerouting of the DSN 462B discharge, the

seven-day average limitation of 45 mg/i will be deleted since this

will be an internal monitoring point and there will not be a direct

discharge.

Effluent limitations and conditions for Percent Removal of Total

Suspended Solids (TSS) are carried over from the existing permit in

accordance with N.J.A.C. 7:14A-3.13(a) (12)i and the DRBC Docket

Decision D-87-70. The monthly minimum limitation of 85% has been

imposed based on the DRBC Effluent Quality Requirements.

Monitoring shall be performed monthly by calculation. Influent

monitoring by composite sample will be required to perform this

calculation. There is no change to these requirements after the

rerouting of the discharge is completed.

U DRAFT - FOR DISCUSSION PURPOSES ONLY

S Oact Sheet/BasisPermit No. NJ0025411Page 61 of 87 Pages

Effluent limitations and conditions for FECAL COLIFORM are carried

over from the existing permit, in accordance with N.J.A.C. 7:14A-

3.13(a) (12) i and the DRBC Docket Decision D-87-70. Monitoring

shall be performed monthly as a grab sample and reported in units

of MPN/100ml. The limitations imposed are a monthly average of 200

MPN/100ml based on the DRBC Stream Quality Objectives and a daily

maximum of 400 MPN/100ml based on the State Water Quality Standards

at N.J.A.C. 7:9B. The monthly average shall be the geometric mean

over a 30 consecutive day period and the maximum shall be the

geometric mean over a seven consecutive day period. There is no

change to these requirements after the rerouting-of the discharge

is completed.

Monitoring requirements for CHLORINE PRODUCED OXIDANTS (CPO) are

being imposed in this permit to develop a database. This data will

be evaluated relative to the level of fecal coliform in the

discharge. Monthly monitoring and reporting are required until

completion of the rerouting of the DSN 462B discharge is completed

DRAFT - FOR DISCUSSION PURPOSES ONLY

QFact Sheet/BasisPermit No. NJ0025411Page 62 of 87 Pages

after which time any residual chlorine in this wastestream will be

treated by ammonium bisulfate and discharged with the cooling tower

blowdown to DSN 461A.

Effluent limitations for pH are consistent with the existing permit

in accordance with the provisions set forth in N.J.A.C. 7:14A-

3.13(a)*(12)i. Monitoring for pH shall be performed monthly using

a grab sample. The monitoring frequency has been reduced from

twice per week to monthly based on a review of the DMR data (see

permit Summary Tables in the Fact Sheet) demonstrating consistent

compliance with the limitations. The daily minimum pH of the

effluent shall not be less than 6.0 Standard Units (SU) and the

daily maximumppH shall not be greater than 9.0 SU. No effluent

limitations or monitoring conditions are imposed after the

rerouting of the discharge is completed. USEPA regulations and

guidance, including the combined wastestream rule, allow mixing a

low volume wastestream such as DSN 462B with cooling water

effluents as long as the final discharge at the cooling water

0DRAFT - FOR DISCUSSION PURPOSES ONLY

%act Sheet/BasisPermit No. NJ0025411.Page 63 of 87 Pages

outfall (DSN 461A} complies with the pH limitation. This is in

order to utilize the residual dechlorination chemical and/or the

natural buffering capacity of .the cooling water.

4. DSN 462A, DSN 463A and DSN 464 - Yard Drains

Stormwater runoff at the facility is directed via a conveyance

system to three discrete outfalls identified as DSN 462A, DSN 463A

and DSN 464. The North Yard Drain conveys stormwater runoff from

catch basin inlets, building roof drains, and parking areas, and

also from construction and excavation dewatering, groundwater

infiltration, tidal waters, and miscellaneous minor drains to DSN.

462A. The South Yard Drain conveys stormwater runoff from catch.

basin inlets, building roof drains, and parking areas, and also

from construction and excavation dewatering, groundwater

infiltration, tidal waters, and miscellaneous minor drains, to DSN

463A. The Perimeter Storm Drain conveys stormwater from access

roads and parking areas, and also building roof drains, groundwater

DRAFT - FOR DISCUSSION PURPOSES ONLY

*act Sheet/BasisPermit No. NJ0025411Page 64 of 87 Pages

and surface water infiltration, and tidal waters to DSN 464.

Schematic diagrams of the stormwater conveyance systems are shown

* in Figure 5 and Figure 7.

The existing permit imposed numeric effluent limitations and

monitoring conditions to the stormwater runoff discharged from DSN

462A, DSN 463A and DSN 464. These limitations were a combination

of limitations based on BAT, as determined by BPJ and limitations

based on effluent quality objectives from the Delaware River Basin

Commission Water Quality Regulations.

The sewage treatment plant at the facility presently discharges to

DSN 462A and this effluent is monitored independently and subject

to numeric limitations at DSN 462B. The sewage treatment plant

effluent will also be rerouted to discharge through DSN 461A

instead of DSN 462A within EDP + one (1) year.

On January 11, 1990, the permittee entered into an ACO with the

Department that, among other things, resolved the issues relating

to compliance with the numeric limitations in the existing permit

DRAFT - FOR DISCUSSION PURPOSES ONLY

S *act Sheet/BasisPermit No. NJ0025411Page 65 of 87 Pages

then applicable to DSNs 462A, 463A and 464 by requiring PSE&G to

undertake certain measures in conjunction with suspension of the

limitations for TSS at DSN 462A, 463A and 464.

In connection with the resolution of these issues, the permittee

undertook a number of measures (e.g, capital projects.) to control

the discharge of suspended solids in stormwater runoff. These

measures included: (1) regrading the facility and installation of

gravel and seeding of grass on areas which were previously in a

natural state to reduce drainage velocity and more equally

distribute. precipitation runoff; (2) installation of inlet

protection on all stormwater collection catch basins to minimize

solids entrainment; and (3) installation of check valves on the

North and South Yard Drain outfalls to reduce tidal intrusion. As

part of the requirements of the ACO, the permittee also conducted

a stormwater study at the facility to determine the feasibility of,

obtaining representative stormwater samples for analysis. The

permittee, in the stormwater study dated July 13, 1990, concluded

that it was infeasible to collect representative stormwater samples

at the facility based on the tidal intrusions into the existing

DRAFT - FOR DISCUSSION PURPOSES ONLY

*act Sheet/BasisPermit No. NJ0025411Page 66 of 87 Pages

st ormwater conveyance system from the Delaware River. The

stormwater study demonstrated that representative monitoring of

stormwater could not be achieved with the existing conveyance

system elevations due to tidal intrusion in the system by Delaware

River water. It was further determined that modifications to the

existing conveyance system elevations to were not pratical due to

l)excessive pump capacity required to handle projected volume of

water due to the tidal intrusions, and 2) high water table (Bft

below grade level at mean high tide).,

The permittee submitted a BMP Plan to the Department dated February

28, 1990 and supplemented this plan with additional information

dated January 31, 1992 in order to satisfy additional requirements

of the ACO. The permittee developed this BMP Plan to prevent or

minimize the potential for contributions of suspended solids into

stormwater runoff discharged to the Delaware River from DSN 462A,

463A and 464. These practices included:

Establishing and maintaining a BMP committee;

Identification and assessment of areas which could potentially

contribute pollutants to the stormwater runoff;

DRAFT - FOR DISCUSSION PURPOSES ONLY

* act Sheet/BasisPermit No. NJ0025411Page 67 of 87 Pages

- Good housekeeping;

Preventative maintenance including structural controls and

stabilization;

Record keeping;

Security; and

Employee training including prevention and response.

As a result of the implementation of the capital projects and the

BMP required under the ACO, the average TSS values reported on Hope

Creek Generating .Station's DMRs since 1992 have consistently been

lower than the values reported prior to the installation of the

capital projects and the BMP. The NJDEP's Bureau of Stormwater

Permitting and the Bureau of Standard Permitting have inspected the

site and have determined that continued use of BMPs instead of

numeric limits is the most appropriate means of regulating the

discharge of pollutants from t his site in stormwater runoff.

In accordance with 40 CFR 122.44 and N.J.A.C. 7:14A-3.13(a) l1, this

draft permit proposes to replace the numeric effluent limitations

and monitoring conditions in the existing permit at DSN 462A, DSN

DRAFT - FOR DISCUSSION PURPOSES ONLY

* act Sheet/BasisPermit No. NJ0025411Page 68 of 87 Pages

463A and DSN 464 with conditions for the permittee to develop and

implement a Stormwater Pollution Prevention (SPP) Plan

incorporating an expanded Best Management Practices (BMP) Plan.

The BMPs are proposed to control and abate the discharge of

pollutants into the stormwater runoff. The Department finds, that

the continuance of numeric effluent limitations and monitoring

conditions is unwarranted and infeasible based on the following: 1)

the tidal intrusion of the Delaware River into the facility's

stormwater conveyance system reported in the stormwater study

submitted by the permittee in 1990; and 2) the material and

* substantial changes at the facility implemented between 1989 and

1992 through its capital improvement projects and implementation of

BMPs such as minimization and elimination of contact of sourceý

materials with stormwater runoff.

The SPP Plan proposed in this draft permit will expand upon these

BMPs by instituting a number of management practices to ensure that

proper stormwater operations, maintenance procedures, and good

housekeeping practices are implemented at the facility to minimize

the contact between stormwater runoff and the- facility's

DRAFT - FOR DISCUSSION PURPOSES ONLY

act Sheet/BasisPermit No. NJ0025411Page 69 of 87 Pages

operations. The proposed SPP Plan conditions will consist of the

following requirements, at a minimum:

Establishing and maintaining a SPP Team;

Description of existing environmental management plans

including the Discharge Prevention Containment and

Countermeasures (DPCC) Plan, Discharge Cleanup and Removal

(DCR) Plan, and the Spill Prevention Control and

Countermeasures (SPCC) Plan;

Site assessment including an identification and assessment

of areas which have a: reasonable potential to contribute

pollutants to the stormwater runoff discharges; and

Selection and implementation of a BMP plan to eliminate or

reduce pollutant loadings into stormwater discharges

including the following;

- Inventory all contributions to the stormwater

discharges;

- Remove, cover or control industrial activity;

- Divert stormwater;.

Spill prevention and response;

DRAFT - FOR DISCUSSION PURPOSES ONLY

*act Sheet/BasisPermit No. NJ0025411Page 70 of 87 Pages

Good housekeeping;

Preventative maintenance including structural controls

and stabilization; and

Inspections and evaluations.

The SPP Plan proposed in this draft permit includes BMPs to prevent

stormwater* contamination through the elimination of exposure,

during and after storm events, of industrial materials, machinery,

waste products, and other source materials located at the facility.

The BMP conditions imposed herein based on BPJ, will operate as

controls on the stormwater runoff to prevent contamination from the.

facility's operations and are intended to achieve Best Conventional

Pollutant Control Technology (BCT) and BAT. Imposing a requirement

to prevent pollution from occurring in the first place, as opposed

to requiring treatment or control once pollution has occurred, is

intuitively more protective of public health and natural resources

and therefore as, if not more, stringent than the numeric effluent

limitations and monitoring conditions established in the existing

1DRAFT - FOR DISCUSSION PURPOSES ONLY

act Sheet/BasisPermit No. NJ0025411

Page 71 of 87 Pages

permit. The Department is proposing to require compliance with an

SPP Plan instead of compliance with numeric limitations based on

the results of the DMR data collected subsequent to the

installation of capital projects designed to control stormwater and

recognition of the USEPA's and NJDEP's belief that controlling

stormwater pollution through.SPP Plans is a more appropriate and

effective means of achieving their goals.

Implementation schedules for all structural and non-structural BMPs

including a schedule(s) for removal, coverage, minimization of

S exposure of source materials to stormwater, and/or stormwater

diversion or treatment shall be included in the SPP Plan. The SPP

Plan shall be developed and submitted to the Department within 6

months of the effective date of the permit. The SPP Plan shall be

implemented within three months of concurrence by the Department.

The SPP Plan shall provide that those BMPs (e.g. spill response,

good housekeeping) that may readily be implemented shall be done so

within 30 days, if not already practiced. The permittee shall be

required to provide certification relative to the accuracy of and

compliance with the SPP Plan during initial submittal, upon

DRAFT - FOR DISCUSSION PURPOSES ONLY

S %act Sheet/BasisPermit No. NJ0025411

Page 72 of 87 Pages

implementation, and annually thereafter. The Stormwater Inspection

Report shall be required annually after implementation. See Part

IV-RF for certification methods.

5. Special Permit Conditions

A. Acute Toxicity Characterization Study

The permittee is required to perform an Acute Toxicity

Characterization Study by conducting definitive f low-

through or definitive static renewal acute toxicity tests

(bioassays) on its wastewater discharged at the cooling

tower blowdown (DSN 461A) after completion of the DSN 462B

rerouting modification. The requirements for the Acute

Toxicity Characterization Study are included in accordance

with N.J.A.C. 7:14A-2.5(a)10 and N.J.A.C. 7:14A-2.6 to

provide data on potential acute effects of the effluent on

the survival of the test species. The Department will use

the results of the Acute toxicity characterization study,

along with other site-specific discharge information, to

DRAFT - FOR DISCUSSION PURPOSES ONLY

0 pact Sheet/BasisPermit No. NJ0025411Page 73 of 87 Pages

perform a reasonable potential analysis in accordance with

40 CFR 122.44(d) (1) (ii) and the TSD to determine if the

permit needs to be modified to incorporate a water quality

based whole effluent toxicity limitation in accordance with

40 CFR 122.44(d) (1) (iii).

Acute toxicity test procedures shall conform to the

"Regulations Governing the Certification of Laboratories

and Environmental Measurements" (N.J.A.C. 7:18-1 sect_).

Subchapter 7 and N.J.A.C 7:18-9.5 of the regulations

contains the criteria and procedures for acute toxicity

testing and analysis. The laboratory performing acute

toxicity testing shall be within the laboratory

certification program included within those regulations.

Test results shall be expressed in terms of the mortalities

in each effluent concentration and the median lethal

concentration (LC50) with confidence interval, if they can

be calculated. The test species required is the Mysid

(Mysidopsis bahia)..

DRAFT - FOR DISCUSSION PURPOSES ONLY

0 pact Sheet/BasisPermit No. NJ0025411Page 74 of 87 Pages

The monitoring frequency shall be one test each quarter for

at least four consecutive quarters. The first test shall

be conducted no later than EDP + 15 months. The Acute

Toxicity Characterization Study shall not be completed

until four tests, which are acceptable to the Department,

have been completed.

B. Chronic Toxicity Characterization Study

The requirements for the Chronic Toxicity Characterization

Study are included in accordance with N.J.A.C.

7:14A-2.5(a)10 and N.J.A.C. 7:14A-2.6 and to provide data

on potential chronic effects of the effluent on. the

survival, growth, and/or reproduction of the two test

species. The results of the Study will also determine

which of the two test species is consistently most

sensitive to the effluent. Multi-species testing is

imposed in accordance with N..J.A.C. 7:9-4.5(f)l.i and

recommendations in the Technical Support Document for Water

Quality-based Toxics Control (USEPA 1991; EPA-505/2-90-001,

0 DRAFT - FOR DISCUSSION PURPOSES ONLY

* act Sheet/BasisPermit No. NJ0025411Page 75 of 87 Pages

March, 1991).

The Permittee shall perform a Chronic Toxicity

Characterization Study on its wastewater discharged at the

cooling tower blowdown (DSN 461A) after completion of the

DSN 462B rerouting modification. Permittee shall conduct

all testing in conformance with the guidelines contained in

the "Chronic Toxicity Testing Specifications .for use in the.

NJPDES Permit Program, Version 2.0, February 1996". The

laboratory performing the chronic toxicity testing shall be

within, the existing acute toxicity testing laboratory

certification program established under N.J.A.C. 7:18-6.

Chronic toxicity tests shall be conducted concurrently with

split samples, using the 7 day larval survival and growth

test for the test species Sheepshead minnow (cvprinodon

varieratus) and Mysid(Mysidopsis bahia). Test results

shall be expressed as the NOEC (No Observable Effect

Concentration), the LOEC (Lowest Observable Effect

Concentration), and IC25 (25% Inhibition Concentration) for

DRAFT - FOR DISCUSSION PURPOSES ONLY

0 pact Sheet/BasisPermit No. NJ0025411Page 76 of 87 Pages

each test endpoint.

The first test shall be conducted no later than EDP + 15

months. Subsequent tests shall be conducted quarterly for

at least four consecutive quarters. The chronic toxicity

characterization study shall not be complete until four

tests, using split samples on the two species have been

completed.

C. Dilution Study

The Federal Clean Water Act, as amended, mandates that the

States include water quality-based effluent limitations in

NPDES permits, if there is a reasonable potential for the

effluent to cause an exceedance of the instream water

quality standards. To enable the Department to determine

the need for water quality-based effluent limitations, the

Permittee may be required to perform a Dilution Study.

A Dilution Study shall be conducted for the cooling tower

DRAFT - FOR DISCUSSION PURPOSES ONLY

Fact Sheet/BasisPermit No. NJ0025411Page 77 of 87 Pages

blowdown, DSN 461A, if the effluent from that outfall

exhibits toxicity (LC 50 <100% or NOEC <100%) during the

chronic or acute toxicity study testing.

If Permittee is required to conduct a Dilution Study,

Permittee shall a submit Dilution Study Work Plan for the

outfall to the Department within 90 days after submittal of

the chronic or acute toxicity testing report in which the

respective discharge exhibits toxicity. The model to be

utilized in the Dilution Study and the basis for selection

of this model shall be identified in the Dilution Study

work plan.

In addition, the "critical period(s)" - a period of minimal

dilution and/or maximum environmental impact on aquatic

life and the designated uses of the receiving water body -

shall be identified by the Permittee in the Dilution Study

Work Plan(s). The Permittee shall commence field work for

any Dilution Study during the first designated "critical

period" which occurs at least 90 days after approval by the

DRAFT - FOR DISCUSSION PURPOSES ONLY

S 1Fact Sheet/Basis

Permit No. NJ0025411Page 78 of 87 Pages

Department of any Dilution Study Work Plan.

The Permittee shall submit to the Chief, Bureau of Standard

Permitting, a report of the results obtained from the

Dilution Study within 6 months of the date the Permittee

completes field work for the Dilution Study.

D. Service Water Bypass

The service water system normally provides makeup water, to

the cooling tower and discharges through DSN 461A. Due to

nuclear safety requirements, the service water system must

remain operable. To facilitate necessary plant

maintenance, the permittee is authorized to temporarily

redirect service water to discharge through DSN 463A. The

addition of sodium hypochlorite (or any other chemical

biocide) shall be terminated during the bypass discharge.

The following conditions must be met by the permittee:

DRAFT - FOR DISCUSSION PURPOSES ONLY

'OFact Sheet/BasisPermit No. NJ0025411Page 79 of 87 Pages

1. Provide written notification to the Chief, Bureau of

Standard Permitting and the Southern Bureau of Water

and Hazardous Waste Enforcement prior to the bypass

discharge. This notification shall include the

expected dates of the bypass, confirmation that sodium

hypochlorite addition to the service water will be

terminated during the bypass, and a brief description

of the reason the bypass is necessary.

2. Provide oral notification to the Southern Bureau of

Water and Hazardous Waste Enforcement at least 24 hours

prior to commencing the bypass discharge.

The permittee has also provided notification to the

Department of the periodic anticipated bypass of service

water through DSN 463A during service water pump swaps

(changeouts) and system transients. The service water pump

swaps and resultant bypasses are necesary to ensure

sufficient service water cooling volumes to satisfy nuclear

safety design parameters during periods of increased river

DRAFT - FOR DISCUSSION PURPOSES ONLY

0 %act Sheet/BasisPermit No. NJ0025411

.Page 80 of 87 Pages

temperatures during summer months. The addition of sodium

hypochlorite (or other biocide) to the service water system

is terminated during these bypass conditions and the bypass

is anticipated to occur for approximately 15 seconds. The

Department proposes to authorize these bypass operations

without any additional notification requirements based on

the termination of biocide addition to the service water

system and the short duration of the anticipated bypass.

E. Flow Measurement using Rhodamine WT Dye

The permittee has previously used and anticipates further

use of Rhodamine WT dye as a tracer in connection with flow

measurement testing of the cooling tower related systems.

The dye is discharged to the Delaware River through DSN

461A. The Department has reviewed the requests to discharge

Rhodamine WT dye during periodic flow measurement testing

on- several occasions and determined that approval to

U DRAFT - FOR DISCUSSION PURPOSES ONLY

tact Sheet/BasisPermit No. NJ0025411Page 81 of 87 Pages

proceed was appropriate. This permit proposes to authorize

the periodic discharge of Rhodamine WT dye to facilitate

Station maintenance without the need for individual

approvals for each use. This dye will discharge to the

Delaware River through outfall DSN 461A. The following

conditions must be met by the permittee:

1. Provide written notification to the Chief, Bureau of

Standard Permitting and the Southern Bureau of Water

and Hazardous Waste Enforcement prior to the use of

Rhodamine WT dye. This notification shall identify the

expected dates of the discharge, the expected

concentration of Rhodamine WT dye to be added, and the

expected concentration of Rhodamine WT dye in the

effluent.

2. Provide oral notification to the Southern Bureau of

Water and Hazardous Waste Enforcement at least 24 hours

prior to commencing the discharge of Rhodamine WT dye.

DRAFT - FOR DISCUSSION PURPOSES ONLY

0O0Fact Sheet/BasisPermit No. NJ0025411

.Page 82 of 87 Pages

3. Within thirty (30) days of completion of the flow

measurement testing,, provide written notification of

completion to the Chief, Bureau'of Standard Permitting

and tp the Southern Bureau of Water and Hazardous Waste

Enforcement.. This notification shall include the

actual dates of the discharge, the actual concentration

of Rhodamine WT dye in the effluent at DSN 461A,' and

the total quantity of Rhodamine WT dye added.

F. Cooling Tower Anti-Scalant

The current NJPDES Permit authorizes the use of an anti-scalant

containing phosphorus in the Cooling Tower system. At the

present time, the permittee is not adding this anti-scalant but

may require future additions to protect the mechanical

integrity of the Cooling Tower system. If ant-scalant addition

is required in the future, the permittee shall notify the

Bureau of Standard Permitting prior to initiation of addition

of the anti-scalant containing phosphorus. Upon approval from

the Department, the permittee shall be allowed to add the anti-

IDRAFT - FOR DISCUSSION PURPOSES ONLY

OFact Sheet/BasisPermit No. NJ0025411Page 83 of 87 Pages

scalant containing phosphorus and be required to monitor and

report the phosphorus concentration from DSN 461A. Monitoring

shall be conducted monthly by grab sample.

EXPRESSION OF LIMITATIONS FOR DSNs 461A. 461C. AND 462B

In accordance with N.J.A.C. 7:14A-3.14(f), process wastewater

limitations for conventional, non-conventional, and toxic

pollutants are expressed in terms of mass based on the long term

average effluent flow except as provided by N.J.A.C. 7:14A-

3.14(f)l., when applicable. Mass limitations are not appropriate

when the mass of the pollutant discharged cannot be related to a

measure of operation and permit conditions ensure that dilution.

will not be used as a substitute for treatment.

DSN 461C is an internal monitoring point with significant

fluctuations in effluent flow rates not based on plant production

but based primarily on precipitation events; therefore, the

imposition of mass limitations for this outfall was deemed

inappropriate. Final effluent limitations for this outfall are

DRAFT - FOR DISCUSSION PURPOSES ONLY

'*Fact Sheet/BasisPermit No. NJ0025411

B-Page 84 of 87 Pages

expressed only on a concentration basis and the Department has

determined that dilution will not be used as a substitute for

treatment.

Although the wastewater discharges for DSNs 461A and 462B are

continuous, the flow rates of these discharges are subject *to

substantial fluctuations, which are primarily dependent on

meteorological conditions (which impacts cooling/makeup water

requirements) and the site population (which largely varies with

plant maintenance activities, holidays and refueling). Based on

the range of fluctuation in flow rates not related to a measure of

operations, mass limitations have been deemed inappropriate for

these outfalls. All effluent limitations for DSNs 461A and 462B

are expressed only on a concentration basis with the exception of

BOD5 at DSN 462B which is based on the loading allocation of the

Delaware River Basin Commission.

DRAFT - FOR DISCUSSION PURPOSES ONLY

0i!Fact Sheet/Basis

Permit No. NJ00254112Page 85 of 87 Pages

CONTENTS OF THE ADMINISTRATIVE RECORD

The following items are used to establish the basis of the Draft Permit:

1 33 U.S.C. 1251 et seq., Federal Water Pollution Control Act.

2 N.J.S.A. 58:10A-1 et sea., New Jersey Water Pollution Control Act.

3 40 CFR Part 122, National Pollutant Discharge Elimination System.

4 N.J.A.C. 7:14A-1 et sea., New Jersey Pollutant Discharge Elimination System Regulations.[A]

5 N.J.A.C. 7:9B-1 et sem., New Jersey Surface Water Quality Standards, 12/6/93.[A]

6 40 CFR Part 131, Federal Water Quality Standards, December 1992.[A]

7 'Field Sampling Procedures Manual", NJDEPE, May 1992.[A]

8 "Discharge Monitoring Report (DMR) Instructional Manual", NJDEPE,December 1993.[A]

9 "Short Term Methods for Estimating the Chronic Toxicity of Effluents and Receiving Waters toMarine and Estuarine Organisms", (USEPA, EPAI600/4-87/026, May, 1988)

10 "EPA Technical Support Document for'Water Quality-based Toxics Control".EPAI505/2-90-001, March 1991.[A]

11 "Basis and Background: Regulation ofToxics in NJPDES/DSW Permits",NJDEPE, April 15, 1993.

12 NJPDES/DSW Permit NJ0025411 effective October 1, 1985

13 NJPDES/DSW Permit NJ0025411 Modification effective May, 1986.

14 NJPDES/DSW Permit NJ0025411 Modification effective May, 1987.

15 NJPDES/DSW Permit NJ0025411 Modification effective September, 1989.

[A] Denotes items which may be found in the NJPDES/DSW Administrative Record Librarylocated in the NJDEP Central File Room, 401 East State Street, Trenton, NJ.

DRAFT - FOR DISCUSSION PURPOSES ONLY

*Fact Sheet/BasisPermit No. NJ0025411Page 86 of 87 Pages

CONTENTS OF THE ADMINISTRATIVE -RECORD (continued)

16 Administrative Consent Order dated January 11, 1990.

17 NJPDES/DSW Permit Renewal Application dated March 30, 1990.

18 Hope Creek Generating Station TSS Best Management Practices Plan dated March, 1990.

19 Representative Monitoring of Stormwater Study dated July 1990

20. Supplemental NJPDES/DSW Permit Renewal Application August 1991.

21 Hope Creek Generating Station Cooling Tower Blowdown Report dated October 30, 1991.

22 Delaware River Basin Commission Letter dated September 23, 1987 Regarding FSOD Allocation.

23 Discharge Monitoring Reports for Hope Creek Generating Station -January 1994 to January 1996.

24 "Methods for Measuring the Acute Toxicity of Effluents and Receiving Waters to Freshwater andMarine Organisms" (EPAI600-4-90-027, September 1991)

25 NJPDES/DGW permit termination notice issued April 8, 1994.

26 Hope Creek Hydrothermal Studies, John E. Edinger Associates, dated June 21, 1994

27 Supplemental NJPDES/DSW Permit Renewal Application, dated May, 1995.

28 "USEPA Stormwater Management for Industrial Activities, Developing Pollution Prevention Plansand Best Management Practices", EPA/832/R-92-006, 1992

29 N.J.A.C. 7:18-7, Regulations Governing the Certification of Laboratories and EnvironmentalMeasurements.

30 "Methods for Measuring the Acute Toxicity of Effluents to Freshwater and Marine Organisms",EPAI600/4-85-013, March 1985.

DRAFT - FOR DISCUSSION PURPOSES ONLY

0 Fact Sheet/BasisPermit No. NJ0025411Page 87 of 87 Pages

CONTENTS OF THE ADMINISTRATIVE RECORD (continued)

31 "Short Term Method for Estimating the Chronic Toxicity of Effluents and Receiving Waters ofMarine Estuarian Organisms", EPAI60014-871028, May 1988.

32 "Chronic Toxicity Testing Specifications for Use in the NJPDES Program, Version 2.0, February1996", NJDEP.

33 "Methods for Measuring the Acute Toxicity of Effluents and Receiving Waters to Freshwater andMarine Organisms", EPAI600/4-90-027, September 1991.

DRAFT - FOR DISCUSSION PURPOSES ONLY

0 V

NEW JERSEY POLLUTANTDISCHARGE ELIMINATION SYSTEM

The New Jersey Department of Environmental Protection herebyrestricts and controls discharges to waters of the State from thesubject facility/activity in accordance with applicable laws andregulations.. The permittee is responsible for complying with allterms and conditions of this authorization and agrees to said termsand conditions as a requirement for the construction, installation,modification or operation of any facility for the collection,treatment or discharge of any pollutant to waters of the State.

PERMIT NUMBER NJ0025411DRAFT

PermitteeHOPE CREEK GENERATING STATIONP.O. BOX 236 / N21HANCOCKS BRIDGE, NJ 08038ATTN: MANAGER - LICENSING AND REGULATION

Co-Permittee

Property OwnerPUBLIC SERVICE ELEC. & GAS CO.80 PARK PLAZAP.O. BOX 570NEWARK, NJ 07101

Location of ActivityPSE&G HOPE CREEK GENERATING

STATIONLOWER ALLOWAYS CREEK TOWNSHIPSALEM COUNTY, NEW JERSEY

Type of. Permit Covered Issuance Effective ExpirationBy This Approval Date Date Date

A: Sanitary SW DischargeB Ind/Comm.SW DischargeC : Thermal SW DischargeRF: Group I - Stormwater

Runoff

DISCHARGED TO: Delaware River CLASSIFICATION: Zone 5

By Authority of:Commissioner's Office NJDEP AUTHORIZATION

0

Checklist

Permit No. NJ0025411

Page 1 of 1

CHECKLIST OF PARTS AND MODULES COMPRISING THIS NJPDES PERMIT

1. Cover Page

2. Checklist

3. Part I (General Conditions for All NJPDES Discharge Permits)

4. Part II - Additional General Conditions for the types of NJPDES Permitschecked as follows:

Part II A (Municipal/Sanitary)

X_ Part 11 B/C

Part II - L (SIU)

Part II - IWMF (Industrial Waste Management Facility)

Part II DGW Specify type(s):

5. Part III- Effluent Limitations and Monitoring Requirements

Part III- A

Part III B/C

Part III -L

Part III- DGW Specify type(s):

6. Part IV - Special Conditions

Part IV - A

X Part IV -B/C

Part IV - L

Part IV - IWMF

*Part IV - DGW Specify type(s):

X Part IV - RF (stormwater)

7. _X_ Part V - Chronic Toxicity Methods

RT II - B/CIrmit No. NJ0025411

Page 1 of 2 pages

ADDITIONAL STANDARD CONDITIONS FORALL NJPDES/DSW*PERMITS FOR INDUSTRIAL DISCHARGES

1. P=rmit Conditions Relating to Treatment Works

A Treatment Works.Approval (TWA) Permit is required prior to the construction,operation, or modification of a treatment works pursuant to N.J.A.C. 7:14A-22.1et. s and the amendments thereto. Applications for a TWA Permit shall. besubmitted to the following address:

New Jersey Department of Environmental ProtectionDivision of Water QualityBureau of Construction and Connection PermitsCN-029Trenton, New Jersey, 08625-0029Attn. Chief

The operation of the treatment works shall be under the supervision of a licensed

operator of the appropriate classification in accordance with the "RulesGoverning the Examination and Licensing of Operators", N.J.A.C. 7:10-13.1 e:sea., which became effective July 2, 1984. The licensed operator shall meet therequirements of the TWA Permit pursuant to the provisions of N.J.S.A. 58:11-64and the amendments thereto.

S 2. Permit Conditions Relating To Industrial Residuals Manaaement

A. Collected grit and screenings, scums, sand bed sands, slurries, andsludges, and all other solids from the treatment process shall be managedin such a manner as to prevent such materials from entering the groundand/or surface waters of the State except in accordance with the NJPDESpermit. If for any reason such materials are placed in the water or onthe lands where they may cause pollutants to enter the ground and/orsurface waters of the State or for any other noncompliance which mayendanger public health or the environment, the following information shallbe reported to the Water and Hazardous Waste Enforcement Element and to

the Bureau of Pretreatment and Residuals pursuant to the requirements asoutlined under N.J.A.C. 7:14A-2.5(a)(14):

(i) Dates of occurrence;(ii) A description of the noncomplying discharge (nature and volume);(iii)Cause of noncompliance;(iv) Steps taken to reduce and eliminate the noncomplying discharge; and(y) Steps taken to prevent recurrence of the condition of noncompliance.

B. The permittee shall not be permitted to store sludge on-site beyond thecapacity of the structural treatment and storage components of thetreatment works nor shall the permittee be permitted to store residuals

on-site in any manner which is not in accordance with the Solid WasteManagement Rules, N.J.A.C. 7:26.

C. The permittee shall comply with the Sludge Quality Assurance Regulations,

N.J.A.C. 7:14-4. Where quality information is required by these

regulations, analyses must reflect the quality of the final sludge productwhich the permittee must remove.

* (RT II - B/crmit No. NJ0025411

Page 2. of 2 pages

D. The permittee shall manage all residuals generated from the treatmentworks in compliance with the New Jersey Solid Waste Management Act,N.J.S.A. 13:lE-l et sea., and the New Jersey Water Quality Planning ActN.J.S.A. 58:llA-1 = sea,, which require conformance with District SolidWaste Management Plans and Water Quality Management Plans. The permitteeshall also comply with all applicable rules and regulations promulgatedpursuant to the federal Resource Conservation and Recovery Act.

E. The permittee shall at all times have on file with the Department, proofof proper residuals management at a facility/operation duly licensed andpermitted. To satisfy this requirement, the permittee shall submit proofof ownership or contractual arrangement with a permittedfacility/operation for the ultimate management of residuals.

Where such permitted residuals management does not extend for the fullterm of this permit, the permittee shall submit similar proof of newpermitted management arrangements which shall become effective no laterthan the expiration date of the previous arrangements. All such proofs ofultimate management must be submitted to:

New Jersey Department of Environmental ProtectionDivision of Water QualityBureau of Pretreatment and ResidualsCN-029Trenton, New Jersey 08625-0029Attn: Chief

The permittee shall assure that residuals produced by the treatment worksis suitable for management at the site identified on such submitted proofof proper residuals management.

F. The permittee shall comply with the provisions concerning the managementof sludge in the Water Pollution Control Act, N.J.S.A. 58:10A-. et sea.,the Solid Waste Management Act, N.J.S.A. 13:1E je / and theimplementing regulations.

IWART III- B/C

Permit No. NJ0025411

Page I of 9 Pages

I.A EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS

During the period beginning EDP and lasting through EDP + five (5)years, the permittee: is authorized to discharge cooling towerblowdown and process wastewaters from outfall serial number 461A.

There shall be no discharge of floating solids or visible foam inother than trace amounts. There shall be no visible sheen.

The abbreviation "N/A" in the table below denotes "Not Applicable"while the abbreviation "NL" denotes "Not Limited" with bothmonitoring and, reporting required.

Samples taken in compliance with therequirements shall be taken at the discharge461A and reported monthly.

specified monitoringmonitoring point of DSN

MONITORING REQUIREMENT

SAMPLE'

EFFLUENT CHARACTERISTIC

Effluent Flow (MGD)

Temperature-influent *F(°C)

Temperature-Effluent °F(°C)

Heat Rate(m2(MBTU/HR) (Sep-May)

Heat Rate(2 )

(MBTU/HR) (Jun-Aug)Chlorine Produced Oxidants

(mg/I)

pH, Effluent (S.U.)

Organic Carbon, Total(mg/I) Net(m3

Acute Toxicity, LC 50

Chronic Toxicity, NOEC

Phosphorus, mg/I ().

DISCHARGE LIMITATION

DAILY MONTHLY DAILY

N/A

N/A

N/A

N/A

N/A

N/A

NL NL

NL NL

NL (6) 97.1 (e)(36.2)

NL 662

Continuous(')

Continuous(')

Continuous0)

Daily

Daily

Continuous(')

Meter (1)

Calculated

CalculatedNL 534

0.2 0.5

6.0 N/A 9.0 Weekly

N/A NL 20

N/A

N/A

NL N/A

NL N/A

Monthly,

Quarterly

Quarterly

Monthly

Grab

Grab

(4)

(4)

GrabN/A NL NL

DRAFT - FOR DISCUSSION PURPOSES ONLY

IART III - B/C

Permit No. NJ0025411Page 2 of 9 Pages.

Footnotes to DSN 461A Effluent Limitiations Table

( See Part IV-B/C 1.H.

(2) The amount of heat per unit time (Heat Rate) is determined by the product of the heat capacity,

discharge flow and the difference between influent and effluent temperatures.

(3) Net Concentration = (Effluent Conc )(Effluent Flow) - (Influent Conc.)*(Influent Flow)

Effluent Flow

(4) See Part IV-B/C 1 .D and 1.E for toxicity testing requirements.

(5) Monitoring and reporting for this parameter is not required unless the permittee initiates the use of ananti- scalant containing phosphuros upon approval from the Department. See Part Ill-B/C, Section 4.

(6) For continuous temperature monitoring, the daily value shall consist of all the temperature values overa given calendar day (24-hour period) averaged together. The permittee shall report the highest of these

daily values as the daily maximum on the DMR, and the average of the daily values as the monthly average.

DRAFT - FOR DISCUSSION PURPOSES ONLY

OPART III - B/CPermit No. NJ0025411Page 3.of 9 Pages

I.B EFFLUENT LIMITATIONS AND MONITORING REOUIREMENTS

During the period beginning EDP and lasting through EDP + five (5)years, the permittee is authorized to discharge the effluent .of theoil water separator from area, building, and equipment drains,auxiliary boiler blowdown and miscellaneous stormwater sourcesthrough outfall serial number 461C.

The abbreviation "N/A" in the table below denotes "Not Applicable'!

while the abbreviation "NL" denotes "Not Limited". with ,bothmonitoring and reporting required.,

Samples taken in compliance with the specified monitoringrequirements shall be taken at the discharge of the separator systemand reported monthly.

EFFLUENT CHARACTERISTIC DISCHARGE LIMITATION MONITORING REQUIREMENT

DAILY MONTHLY DAILY SAMPLE

* Flow (MGD) N/A NL NL ContinuousM1 ) Meter

Petroleum Hydrocarbons N/A 10 15 Twice/Month Grab(mg/I)

Organic Carbon, Total N/A NL 50 Monthly Composite(mg/I)

Total Suspended Solids N/A 30 100 Monthly Composite(mg/I)

(1 See Part IV-B/C 1.H.

UDRAFT - FOR DISCUSSION PURPOSES ONLY

9 III - B/C

Permit No. NJ0025411

Page 4 of 9 Pages

1.C.1 EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS

During the period beginning EDP and lasting through EDP + one (1)year, the permittee is authorized to discharge sewage treatmentplant effluent through outfall serial number 462B.(')

There shall be no discharge of floating solids or visible foam inother than trace amounts. There shall be no visible sheen.

The abbreviation "N/A" in the table below denotes "Not Applicable"while the abbreviation "NL" denotes "Not Limited" with bothmonitoring and reporting required.

Samples taken in compliance with the specified monitoringrequirements shall be taken at the discharge of the Sewage TreatmentPlant and reported monthly.

EFFLUENT CHARACTERISTIC DISCHARGE LIMITATION MONITORING REQUIREMENT

DAILY MONTHLY DAILY SAMPLE

Flow (MGD) N/A NL NL Daily Meter

BOD5 (kg/day) N/A 8(2) NL Monthly Composite

BOD 5 (% Removal) 87.5 N/A N/A Monthly Calculated

Total Suspended Solids N/A 30(3) NL Monthly Composite(mg/I)

Total Suspended Solids 85 N/A N/A Monthly Calculated(% Removal)

F.Coliform (MPN/100ml) N/A 200(4). 400(4) Monthly Grab

Oil and Grease N/A 10 15 Monthly Grab(mg/I)

pH, Effluent (S.U.) 6.0 N/A 9.0 Monthly Grab

Chlorine Produced Oxidants N/A NL NL Monthly Grab(mg/I)(5 )

(1) See Part IV-B/C.G.

(2) This corresponds to the First Stage Oxygen Demand (FSOD) DRBC allocation of 9.5 kg/day (21 lbs/day).

(3) TSS shall not exceed 45 mg/I as a 7-day average.

(4) The average shall be the geometric mean over a 30 consecutive day period and the maximum shall be thegeometric mean over a 7-consecutive day period.

DRAFT - FOR DISCUSSION PURPOSES ONLY

RkT III - B/C

Permit No. NJ002541iPage 5 of 9 Pages

( Chlorine Produced Oxidants (CPO) shall be monitored using an EPA test method from 40 CFR 136 thatacheives a minimum detection level of 0.1 mg/I.

D -

DR. ORDSUSINPOSSOL

O RT III - B/C

Permit No. NJ0025411Page 6 of 9 Pages

1.C.2 EFFLUENT LIMITATIONS AND MONITORING REOUIREMENTS

During the period beginning EDP + one (1) year and lasting throughEDP + five (5) years, the permittee is authorized to dischargesewage treatment plant effluent through outfall serial number462B. (1)

There shall be no discharge of floating solids or visible foam inother than trace amounts. There shall be no visible sheen.

The abbreviation "N/A" in the table below denotes "Not Applicable"while the abbreviation "NL" denotes "Not Limited" with bothmonitoring and reporting required.

Samples taken in compliance with the specified monitoringrequirements shall be taken at the effluent of the Sewage TreatmentPlant prior to combining with DSN 461A and reported monthly.

EFFLUENT CHARACTERISTIC DISCHARGE LIMITATION MONITORING REQUIREMENT

DAILY MONTHLY DAILY SAMPLE

Flow (MGD) N/A NL NL Daily Meter

BOD5 (kg/day) N/A 8(2) NL Monthly Composite

BOD, (% Removal) 87.5 N/A N/A Monthly Calculated

Total Suspended Solids (mg/I) N/A '30 NL Monthly Composite

Total Suspended Solids 85 N/A N/A Monthly Calculated(% Removal)

F.Coliform (MPN/100ml) N/A 200(3 I 400(3) Monthly Grab

Oil and Grease N/A 10 15 Monthly Grab

(mg/I)

(1) See Part IV-B/C.G.

(2) This corresponds to the First Stage Oxygen Deman'd (FSOD) DRBC allocation of 9.5 kg/day (21 lbs/day).

(3) The average shall be the geometric mean over a 30 consecutive day period and the maximum shall be thegeometric mean over a 7-consecutive day period.

DRAFT - FOR DISCUSSION PURPOSES ONLY

IART III - B/CPermit No. NJ0025411Page 7 of 9 Pages

2. Additional Effluent Limitations-Delaware River BasinCommission (DRBC)

The permittee shall discharge in a manner so as not to violate theWater Quality Regulations of the Delaware River Basin Commissionfor Zone 5 of the Delaware River Basin.

3. Use of Biocides or Other Cooling Water Additives

The permittee has informed the Department that it does not use anycorrosion inhibitors, biocides, or other cooling water additiveswith the exception of sodium hypochlorite, ammonium bisulfite, andsodium hydroxide in its recirculated cooling water and coolingtower blowdown. If the permittee decides to, begin using anyadditional agents in. these systems in the future, the permitteemust notify the Bureau of Standard Permitting at least 180 daysprior to use so that the permit may be reopened to incorporate anyadditional limitations or conditions the Department deems, necessary.

4. Coolina Tower Anti-Scalant

Addition of the anti-scalant containing phosphorus to the coolingwater tower system is currently not required. If anti-scalantaddition is required in the future, the permittee shall notify theBureau of Standard Permitting prior to initiation of anti-scalantchemical addition. Upon approval from the Department, thepermittee shall be allowed to add the anti-scalant containingphosphorus and be required to monitor and report the phosphorusconcentration from DSN 461A. Monitoring shall be conducted monthlyby grab sample.

5. Modification of Monitoring Reauirements

The permittee may request a minor modification of its permit todecrease monitoring frequencies for limited parameters if the.permittee believes that site-specific conditions indicateapplicability of such a modification.

DRAFT - FOR DISCUSSION PURPOSES ONLY

fART III - B/CPermit No. NJ0025411Page 8 of 9 Pages

The Department will consider reducing the monitoring frequency ofa parameter provided that:

(1) ELGs applicable to the facility do not specify therequired monitoring 'frequency;

(2,) the frequency reduction conditions are included in the.Draft Permit, Fact Sheet, or Statement of Basisaccompanying the public notice of the draft permit;

(3) the permittee has shown consistent compliance with allpermit conditions for the affected parameter(s) for:

(a). a minimum period of one (1) year for a monitoringfrequency of weekly;

(b) a minimum period of two (2) years for a monitoringfrequency of twice per month;

(c) a minimum period of three (3) years for a,monitoring frequency of monthly;,

(d) a minimum period of five (5) years for a monitoringfrequency of quarterly (except WET testing); and

(e) a minimum period of four tests for Whole EffluentToxicity (WET) limitations;

(4) A monitoring frequency can be reduced as follows:

(a) from weekly to monthly;(b) from twice monthly to monthly;(c) from monthly to !quarterly; or(d) from quarterly to semi-annually or annually.

Reduction of monitoring frequency is not automatic. The Departmentshall determine whether or not a reductin i.s warranted. The DMRsshall be reviewed to Verify 'consistent compliance with permitlimitations and conditions for the affected parameter(s). If theDepartment agrees to grant the request, the Department will performa conditional change to the' permit to change the monitoringfrequency of the affected parameters. After the modification, thepermittee's DMRs are subject to periodic review to insure that theabove requirements are still satisfied.

DRAFT - FOR DISCUSSION PURPOSES ONLY

0 9 ART III - B/CPermit No. NJ0025411Page 9 of 9 Pages

A request for a modification of the monitoring frequency should besent to the Chief of the Bureau of Permit Management, CN-029,Trenton, New Jersey 08625. A copy of the letter should also besent to the Chief of the Bureau of Standard Permitting at the sameaddress.

6. Toxic Pollutant Reopener Clause

Pursuant to N.J.A.C. 7:14A-3.13(a)3.iv., the Department may modifyor revoke and reissue any permit to incorporate limitations orrequirements to control the discharge of toxic pollutants,including whole effluent, chronic and acute toxicity requirements,chemical specific limitations or toxicity reduction requirements,as applicable.

U DRAFT - FOR DISCUSSION PURPOSES ONLY

fART IV - B/C

Permit No. NJ0025411Page 1 of 13 Pages

1. ADDITIONAL REOUIREMENTS OF THIS PERMIT

A. State and Local Reauirements - Radiation

(a) The permittee shall comply with all regulations setforth in N.J.S.A. 26:2D-1 et s regardingRadiation Protection.

(b) All radioactive wastes shall be collected, removed,and disposed of in accordance with N.J.A.C. 7:28-11.1 sa..

B. There shall be no discharge of polychlorinated biphenylcompounds such as those which were% commonly used fortransformer fluid.

C. The permittee is licensed by the U.S. Nuclear RegulatoryCommission (USNRC) and responsible to that agency forcompliance with radiological effluent limitations,monitoring requirements, and other licensing conditions.

D. Acute Toxicity Biomonitorina Reauirements

The permittee shall perform an Acute ToxicityCharacterization Study by conducting definitive flow-through or definitive static renewal acute toxicity tests(bioassays) on its wastewaters discharged at the coolingtower blowdown (DSN .461A). Such testing will determineif appropriately selected effluent concentrations willaffect the survival *of the test species.

1. All toxicity tests shall be conducted in accordance.with the following:

(a) Acute toxicity test procedures shall conform tothe "Regulations Governing LaboratoryCertification and Standards of Performance"(N.J.A.C. 7:18-1 at se.). :Subchapter 6 of theregulations contains the criteria and

DRAFT - FOR DISCUSSION PURPOSES ONLY

9 ART IV B/CPermit No. NJ0025411Page 2 of 13 Pages

procedures for acute toxicity testing andanalysis. The laboratory performing acutetoxicity testing shall be within the laboratorycertification program included within thoseregulations.

(b). Test results shall be expressed in terms of themortalities in each effluent concentration and,if they can be calculated, the median lethalconcentration (LC50) with confidence interval.

(c) All samples taken for the purpose of monitoringshall be representative of the monitored DSN.

2. Test Species and Test Duration

(a) The test duration shall be 96 hours.

(b) The test species is Mysid (Mysidopsis bahia).

3. Monitoring Frequency

(a) The monitoring frequency shall be one test eachquarter.for at least four consecutive quarters.The first test shall be conducted no later thanEDP + 15 months.

(b) Any test that does not meet the specificationsof N.J.A.C. 7:18-6, the laboratorycertification regulations, must be repeated assoon as practical within the monitoring period.

(c) The Acute Toxicity Characterization Study shallnot be completed until four tests, which areacceptable to the Department, have beencompleted.

4. The following, information shall initially besubmitted within EDP + 14 months. If there is achange in the acute toxicity testing contractlaboratory, this information shall again be

DRAFT - FOR DISCUSSION PURPOSES ONLY

%PRT IV - B/C

Permit No. NJO025411Page 3 of 13 Pages

submitted within two (2) months of that change.This information' shall be submitted in duplicate tothe Department at the address in paragraph 5 below.

(a) A fully completed "Methodology Questionnairefor Acute Toxicity Tests" form, which includesan identification of the certified acutetoxicity testing laboratory responsible for thetesting. Copies of this form are provided tocertified laboratories.

(b) A schematic diagram which depicts the locationthat the effluent samples will be taken; thediagram shall indicate the location of effluentsampling in relation to any wastewatertreatment facilities (includingchlorination/disinfection if present) and allDSNs.

(c) A photocopy of a county map or USGS quad withthe location of the dilution water samplingsite relative to the effluent discharge pointmarked (unless the use of a reconstituted waterhas been approved).

5. Acute toxicity test results shall be reported on the"NJPDES Biomonitoring Report Form - AcuteBioassays," copies of which are provided tocertified laboratories and may be obtained from theaddress below. TWO COPIES of each completed reportform shall be submitted within 60 days of testcompletion to:

Division of Water QualityBureau of Standard PermittingCN-029Trenton, New Jersey 08625Attention: Industrial Biomonitoring Program

DRAFT - FOR DISCUSSION PURPOSES ONLY

9 ART IV -B/CPermit No. NJ0025411Page 4 of 13 Pages

E. Chronic Toxicity Characterization Study

The permittee .shall conduct a Chronic ToxicityCharacterization Study. This study shall consist ofconcurrent chronic toxicity testing with two species,conducted 'on the wastewater discharge at the coolingtower blowdown (DSN 461A). Such testing will providedata regarding the effects of appropriately selectedeffluent concentrations on the'survival, growth and/orreproduction of the test species and determine which testspecies is consistently most sensitive to the effluent.

1. All testing shall be conducted in accordance withthe following procedures:

(a) Testing shall be in conformance with theguidelines contained in the "Chronic ToxicityTesting Specifications for Use in the NJPDESPermit Program, Version 2.0, February 1996".

(b) The laboratory performing the toxicity testingshall be within the existing acute toxicitytesting laboratory certification programestablished under N.J.A.C. 7:18-6.

(c) Test results shall be expressed as the NOEC (NoObservable Effect Concentration),. the LOEC(Lowest Observable Effect Concentration), andIC25 (25?% Inhibition Concentration) for eachtest endpoint.

2. Test Species and Test Duration

(a) Chronic toxicity tests shall be conductedconcurrently with split, samples, using, the

* following test species and test durations:

i. Sheepshead minnow (Cyprinodn variegatus),7 day larval survival and growth test;and,

SDRAFT - FOR DISCUSSION PURPOSES ONLY

9 ART IV - B/CPermit No. NJO025411Page 5 of 13 Pages

ii. Mysid (Mysidopsis bahia),7 day larval survival, growth and fecunditytest.

(b) The permittee has the option of concurrentlytesting with a third species from among themethods specified in paragraph l.a. above. Theselection of the third species must be approvedby *the Department prior to initiating testingwith this species.

3. Monitoring Frequency

(a) The first test shall be conducted no later thanEDP + 15 months. Subsequent tests shall beconducted quarterly for at least fourconsecutive quarters.

(b) The chronic toxicity characterization studyshall not be complete until four tests, usingsplit samples on the two species, which areacceptable:• to the Department, have beencompleted.

Cc) If a test has been reviewed for quality controland found to be unacceptable to the Department,the split sample tests shall be repeated assoon as practicable within the, monitoringperiod.

4. The following information shall be submitted induplicate to the address in paragraph 5 below withinEDP + 14 months and within 2 months following achange in the chronic toxicity contract laboratory.

.(a) an identification of the fish species selectedfor the study;

(b) an identification of the acute toxicitycertified laboratory responsible for conductingthe chronic toxicity tests;

DRAFT - FOR DISCUSSION PURPOSES ONLY

0I9 ART IV - B/C

Permit No. NJ0025411Page 6 of 13 Pages

(c) a completed chronic methodology summaryquestionnaire (copies of this form will beprovided to the certified laboratories and isavailable from the address below); and

(d)' a schematic diagram of the facility with thesampling points and all other dischargesclearly marked.

5. Test results shall be reported on forms provided tothe certified laboratories by the Department. Twocopies of all test reports shall be submitted withinsixty (60) days of each test completion to:

Division. of Water QualityBureau of Standard PermittingCN-029

Trenton, .New Jersey. 08625Attention: Industrial Biomonitoring Program

* F. Dilution Study

1. To enable the Department to determine the need for WaterQuality-Based Effluent Limitations, the permittee may berequired to perform a Dilution Study and/or a ToxicityIdentification Evaluation (TIE), if the effluent from thecooling tower blowdown outfall, DSN 461A, exhibitstoxicity. Toxicity for this purpose is defined inparagraphs (a) or (b) below:

(a) the result of a valid acute.toxicity test during theAcute Toxicity Characterization Study is reported asan LC50 less than 100%; or,.

(b) the result of a Valid chronic toxicity test duringthe Chronic Toxicity Characterization Study isreported as an NOEC less than 100%.

*2. if the effluent from the cooling tower blowdown outfall,

DSN 461A, exhibits toxicity as defined in paragraphs1.(a) or 1.(b) above during the chronic or acute toxicitystudy testing, sampling frequency shall be increased to

DRAFT - FOR DISCUSSION PURPOSES ONLY

0 fART IV - B/CPermit No. NJ0025411Page 7 of 13 Pages

monthly for the respective toxicity study and a minimumof four additional acute or chronic toxicity tests shallbe performed. The increased sample frequency is todetermine if the toxicity is persistant.

3. If the effluent from the cooling tower blowdown outfall,DSN 461A, exhibits toxicity as defined in paragraphs1.(a) or 1. (b) above during the chronic or acute toxicitystudy testing on two. consecutive acute or chronictoxicity tests, the permittee shall either:

(a) Initiate a Toxicity Identification Evaluation (TIE)in accordance with paragraph 4 below; or,

(b) Initiate a Dilution Study in accordance withparagraph 5 below.

4. The permittee shall conduct the TIE as follows:

(a) The permittee shall submit a proposed plan to theDepartment within 90 days of the occurrence of thetriggering toxicity test. The proposed TIE planshall be prepared in accord with: "Methods forAquatic Toxicity Identification Evaluations, Phase IToxicity Characterization Procedures" (EPA 600 3-88034) to address acute toxicity, or, "ToxicityEvaluation Identification:Characterization ofChronically Toxic Effluents" (EPA/600/6-91/005) toaddress chronically toxic effluents, or the mostcurrent revision to these documents.

(b) Upon notice that the Department has reviewed andapproved the proposed plan and schedule, thepermittee shall implement the TIE in accordance withthe approved plan and schedule.. Progress reportsdetailing the activities undertaken and the datacollected in connection with the TIE shall besubmitted to the Department beginning 90 days fromthe date of receipt of NJDEP's approval of the TIE.Progress reports shall then be submitted on orbefore January 1, April 1, July 1, and October 1 ofeach year until the TIE is completed. The

DRAFT - FOR DISCUSSION PURPOSES ONLY

* 0PART IV - B/CPermit No. NJ0025411Page 8 of 13 Pages

respective toxicity tests shall. continue to beperformed monthly during performance of the TIEunless reduced sampling frequency is approved by theDepartment.

5. Within 3 months of identification that a Dilution Studyis required, the permittee shall submit a Dilution StudyWork Plan to the Department. The Dilution Study Work Planshall be developed consistent with the Department's"Procedures and Requirements for Conducting DilutionStudies!".

(a) The permittee shall commence field work during thefirst designated "critical period" which occurs atleast ninety (90) days after approval by theDepartment of the Dilution Study Work Plan. The"critical period(s)" shall be defined in theDilution Study Work Plan and is that period whichproduces the minimal dilution. If a critical periodexists during the 90 days after approval from theDepartment, the permittee is not precluded fromcommencing the Study during that period.

(b) The permittee shall submit to the Department areport of the results obtained from the DilutionStudy within six (6) months of completion of thefield work associated with the Dilution Study.

G. DSN 462B Rerouting Modification

The permittee shall redirect the discharge from the SewageTreatment Plant, DSN 462B, to the Cooling Tower Blowdown fortreatment prior to discharge through DSN 461A. Thismodification shall be completed no later than EDP + one. (1)year. Upon completion of the modification, the Permitteeshall notify the Department of same and the effluentlimitations and monitoring requirements of Part III-B/C.1.C.2shall apply.

DRAFT - FOR DISCUSSION PURPOSES ONLY

9 ART IV - B/CPermit No. NJ0025411

Page 9 of 13 Pages

H. Continuous Monitoring

Part III-B/C requires continuous monitoring for certainparameters. In the event the continuous monitors aretemporarily unavailable at DSN 461A or DSN 461C due tomaintenance, calibration, or inoperability of the continuousmonitor, the permittee may use one of the following methodsfor reporting during such interim periods:

1. DSN 461A Effluent Temperature - temperature detectorlocated at the dechlorination system, a temporarycontinuous temperature monitor, or manual sampling once pershift.

2. DSN 461A Influent Temperature.- a temporary continuoustemperature monitor, or manual sampling once per shift.

3. DSN 461A Effluent Flow - an installed float meter, manualmeasurement of the height over the effluent weir once pershift, or a calculation based on the difference betweenintake flow and estimated evaporative losses.

4. DSN 461C Effluent Flow - calculations based on liftstation pump operating hours or pumping events.

Any results from the alternative monitoring methodologiesshall not be reported for periods when the primary monitoringdevice is correctly operating. This authorization to usealternative monitoring methodologies does not alleviatepermittee's obligation to maintain the primary monitoringinstrumentation and devices and to ensure their properoperability and availability to the maximum extent practicableconsistent with the applicable requirements of N.J.A.C. 7:14A-1 2t se.

DRAFT - FOR DISCUSSION PURPOSES ONLY

SRT IV - B/CPermit No. NJ0025411Page 10 of i3 Pages

I. Service Water Bypass

To facilitate necessary Station maintenance, the permittee isauthorized to temporarily redirect service water to dischargethrough DSN 463A, bypassing DSN 461A. The addition of sodiumhypochlorite (or ýany other chemical biocide) shall beterminated during the bypass discharge. The followingconditions must be met by the permittee:

1. Provide written notification to the Chief, Bureau ofStandard Permitting and the Southern Bureau of Water andHazardous Waste Enforcement prior to the bypassdischarge. This notification shall include the expecteddates of the bypass, confirmation that, sodiumhypochlorite addition to the service. water will beterminated during the bypass, and a brief description ofthe reason the bypass is necessary.

2. Provide oral notification to the Southern Bureau of Waterand Hazardous Waste Enforcement at least 24 hours priorto commencing the bypass discharge.

J. Flow Measurements using Rhodamine WT Dye

The permittee is authorized to perform periodic. flowmeasurement testing of the cooling tower related systems usingRhodamine WT dye as a tracer. This dye will discharge to theDelaware River through outfall DSN 461A. The followingconditions must be met by the permittee:

1. Provide written notification to the Chief, Bureau ofStandard Permitting and the Southern Bureau of Water andHazardous Waste Enforcement prior to the use of RhodamineWT dye. This notification shall include the expecteddates of the discharge, the expected concentration ofRhodamine WT dye in the effluent, and the anticipatedconcentration of Rhodamine WT dye to be added.

DRAFT - FOR DISCUSSION PURPOSES ONLY

9 ART IV - B/CPermit No. NJ0025411Page 11 of 13 Pages

2. Provide oral notification to the Southern Bureau of Waterand Hazardous Waste Enforcement at least 24 hours priorto commencing the discharge of Rhodamine WT dye.

3. Within thirty (30) days of completion of the flowmeasurement testing, provide written notification ofcompletion to the Chief, Bureau of Standard Permittingand the Southern Bureau of Water and Hazardous WasteEnforcement. This notification shall include the actualdates of the discharge, the actual concentration ofRhodamine WT dye in the effluent at DSN 461A, and thetotal quantity of Rhodamine WT dye added.

K. Cooling Tower Total'Suspended Solids Study

(1) The Permittee shall perform a cooling tower system TSSstudy to determine if the cooling tower system is measurablychanging the volume of total solids from the influent. ThePermittee shall submit a report of the Study to the

SDepartment.

(2) The Permittee shall submit a Plan of Study to theDepartment within EDP+6 months. Sampling for the Study shallbe completed within 18 months of Department approval of thePlan of Study. The Final Study Report shall be submitted.tothe Department no later than 6 months after completion of thescheduled sampling. The Plan of Study shall include, at aminimum:

a. Proposed sample locations for influent and effluentsamples. The Plan of Study may include an initialevaluation of the efficacy of identified samplepoints. This initial evaluation shall be completedwithin 6 months from initiation of the Study suchthat at least 12 months of data are collected at the.designated sample locations. Upon completion of theinitial evaluation, *the Permittee shall submit theidentification of the designated sample locations tothe Department. If the Permittee determines a morerepresentative sample location should be designatedduring the Study, the Permittee shall notify the

DRAFT - FOR DISCUSSION PURPOSES ONLY

'PART IV - B/CPermit No. NJ0025411Page 12 of 13 Pages

Department of the new designated sample location(s)and the basis for changing designated samplelocation(s). The Department may reject any changeto the designated sample location by notifying thePermittee within 30 days of, the Permittee'ssubmittal of the new sample location(s). ThePermittee is not precluded from obtaining samples atadditional locations and utilizing these data in theFinal Report as long as the designated samplelocation data is also included.

b. Sample types proposed, such as grab, 24 hourscomposite, 6 hour composite, multiple grab, orsampling event relative to an external influencesuch as meteorology, time delay, or tide. The Planof Study should include a discussion of the proposedsample types and the rationale for selection. Theinitial Ievaluation sample type(s) should bespecified in the Plan of Study and the sampletype(s) for the remainder of the Study may besubmitted to the Department at the time thedesignated sample points are submitted.

c. The schedule for completing the Study whichincludes:i. submittal of the Plan of Study by EDP+6 months;ii: completion of the initial evaluation within 6

months of Department approval *of the Plan ofStudy;

iii: completion of all sampling for the Study within18 months of Department approval of the Plan ofStudy;

iv: submittal of the final Study report within 6months of completion of sampling.

d. Sampling shall be conducted at least two times permonth during the sampling period at both theinfluent and the effluent of the cooling towersystem.

DRAFT - FOR DISCUSSION PURPOSES ONLY

PART IV - B/CPermit No. NJ0025411Page 13 of 13 Pages

(3) The Permittee shall submit a final report summarizing theanalytical data and presenting the results of the Study. ThePermittee shall retain copies of all analytical data,including laboratory data sheets, for at least five yearsfollowing submittal of the final report. Copies of this datashall be provided to the Department upon request.

DRAFT - FOR DISCUSSION PURPOSES ONLY

9art IV-RFPermit No.NJ0025411Page 1 of 13 Pages

1. PERMIT CONDITIONS RELATING TO INDUSTRIAL STORMWATER

A. Stormwater Pollution Prevention Plan

1. Stormwater Pollution Prevention Plan

The following outline provides the key elements of an acceptableStormwater Pollution Prevention Plan (SPPP). The purpose of theSPPP is to meet the following objectives:

a) to identify potential sources of pollution and sourcematerials onsite which may reasonably be expected toaffect the quality of stormwater dischargesassociated with industrial activity;

b) to describe and ensure that practices are implementedto eliminate and/or reduce pollutants from sourcematerials in stormwater discharges associated withindustrial activity; and

c) to ensure compliance with the terms and conditions ofthis permit.

Source materials are defined as any materials or machinery,'located at the facility and directly or indirectly related toprocess or other industrial activities, which could be a sourceof pollutants in a stormwater discharge associated withindustrial activity that is subject to the Clean Water Act and/or40 CFR 122.26. Source materials include, but are not limited toraw materials; intermediate products; final products; wastematerials; by-products; industrial machinery and fuels; andlubricants, solvents, and detergents that are related to processor other industrial activities. Material or machinery that arenot exposed to stormwater or that are not located at the facilityare not source materials.

2. Stormwater Pollution Prevention Team

The permittee shall form and identify a Stormwater PollutionPrevention Team in the SPPP. The SPPP shall name specificindividuals or positions within the facility organization who aremembers of the team. The team is responsible for developing the

DRAFT - FOR DISCUSSION PURPOSES ONLY

9 art IV-RFPermit No.NJ0025411Page 2 of 13 Pages

SPPP in accordance with good engineering practices, and for theplan's implementation and maintenance. The plan shall clearlyidentify the responsibilities of each team member. Theactivities and responsibilities of the team shall address allaspects of the facility's SPPP which are provided below.

3. Description of Existing Environmental Management Plans

The team shall evaluate the facility's existing environmentalmanagement plans and programs 'for consistency with this permitand determine which provisions, if any, from these other planscan be incorporated by reference into the SPPP. Examples ofplans which may be referred to when applicable to the siteinclude: the current BMP, Discharge Prevention Containment andCountermeasure (DPCC), Discharge Cleanup and Removal (DCR),Preparedness Prevention and Contingency Plan (PPCP, 40 CFR Parts264 and 265), the Spill Prevention Control and Countermeasures(SPCC) requirements (40 CFR Part 112), the National PollutantDischarge Elimination System Toxic Organic Management Plan(NPDESTOMP, 40 CFR Parts 413, 433, and 469), and the OccupationalSafety and Health Administration (OSHA) Emergency Action Plan (29CFR Part 1910). A copy of any plans referred to in the SPPPshould be kept on-site with the SPPP.

4. Site Assessment

The Site Assessment shall describe the physical facility and thepotential pollutant sources (materials, activities and areas)which may be reasonably expected to affect the quality ofstormwater discharges. The key elements of the site assessmentshall include, at a minimum, the following requirements:

DRAFT - FOR DISCUSSION PURPOSES ONLY

Part IV-RFPermit No.NJ0025411Page 3 of 13 Pages

a)' Inventory Requirements

Each facility must develop and update annually, asappropriate, an inventory which includes, at a minimum, thefollowing:

(i) list of the general categories of source materialsthat have been used, loaded/unloaded, stored,treated, spilled, leaked and/or disposed onsite in amanner to allow exposure to stormwater; and

(ii) list of any domestic wastewater, non-contact cooling.water, treated groundwater or process waste waterthat is generated at the facility and dischargedthrough separate storm sewers to surface waters.List any current NJPDES permits or permitapplications that the facility may have for suchdischarges.

*b). Mapping Requirements

_ A site map drawn to an appropriate scale that clearly showsthe following:

(i) buildings and other permanent structures;(ii) paved areas and roadways;(iii) surfacewater bodies (e.g., rivers, lakes,

streams, bays, estuaries) that are located onor abut the property which receive or mayreceive stormwater from the site;

(iv) location of all stormwater discharge pointsand outfalls;

(v) location of each point or sewer segment, wheredomestic waste water, treated groundwater,process waste water or non-contact coolingwater generated by the facility enters stormsewers that discharge to surface waters;

(vi) outline of the drainage area within thefacility boundaries for each stormwateroutfall and a depiction of flow direction(e.g., arrowhead) of stormwater in eachdrainage area;U

DRAFT - FOR DISCUSSION PURPOSES ONLY

art IV-RFPermit No.NJ0025411Page 4 of 13 Pages

(vii) locations where source materials are likely tobe exposed.to stormwater, and the followingactivities 'and/or areas, at a minimum; storageareas, palieted materials, outdoor handling,treatment or disposal areas, loading and/orunloading areas, manufacturing and/orprocessing 'areas, waste storage areas,vehicle/equipment maintenance areas,vehicle/equipment fueling areas, hazardouswaste storage or disposal areas, areas ofspills and/or leaks of source materials, andaccess routes;

(viii) location of existing stormwater structuralcontrol measures (e.g., containment, berms,detention/retention basins, grassed swales);and

(ix) areas of existing and potential. soil erosion.

c) Narrative Description of Existing Conditions

The SPPP shall include a narrative description concerningthe existing management of all source materials at thefacility which are handled, treated, stored, disposed, orwhich otherwise exist in a manner allowing contact withstormwater. The narrative description shall address thefollowing where appropriate:

(i) any discharges of domestic wastewater, non-contactcooling water, treated groundwater or process waterthat are listed in accordance with Item A.4.a.iiabove (unless such discharges have been authorized bythis or other NJPDES permits or identified inapplications or requests for authorization submittedfor other NJPDES permits);

(ii) description of type of industrial activities and/orareas (e.g., fueling, material handling,manufacturing or processing areas) at the site;

(iii) the actual or potential pollutant categoriesassociated with each industrial area and/or activitywhere source materials are likely to be exposed tostormwater including, but not limited to: fueling

DRAFT - FOR DISCUSSION PURPOSES ONLY

O 9 art IV-RFPermit No.NJ0025411Page 5 of 13 PagesI stations, loading/unloading areas, maintenance shops,

areas where spills and/or leaks of source materialsfrequently occur, equipment or vehicle cleaningareas, outdoor storage areas, outdoor manufacturingor processing areas, onsite waste disposal areas,.above ground liquid storage tanks, outside storage ofraw materials, by-products, or finished products,(e.g., fueling area - diesel fuels, gasoline,,petroleum hydrocarbons); and

(iv) a description of existing management practicesemployed to: eliminate contact of source materialswith stormwater; minimize or reduce pollutants fromsource materials through structural or non-structural.measures; divert stormwater to specific areas on oroff-site, including diversion to containment areas,holding tanks, treatment facilities, or sanitary orcombined sewers; treat stormwater discharging from.the site;: and prevent or permit any discharges ofdomestic wastewater, non-contact cooling water,treated groundwater or process wastewater to surface

* water.

5. Best Management Practices (BMP) Selection and Plan Design

The permittee shall evaluate the information from the siteassessment phase of this plan to identify potential and existingsources of stormwater contaminated by source material. Alldischarges to surface water of domestic wastewater, non-contactcooling water, treated groundwater and process waste water mustbe eliminated or permitted by this or another NJPDES permit.Based upon the site assessment performed, the permittee shalldevelop BMPs that will effectively eliminate or reduce pollutantloadings in stormwater discharges from the facility in accordancewith the following sections. BMPs are measures used to preventor mitigate pollution from any type of activity. The evaluation

*DRAFT - FOR. DISCUSSION PURPOSES ONLY

ort IV-RFPermit No.NJ0025411Page 6 of 13 Pages

and selection of the BMPs addressing each area, and/or activity'where source materials are exposed to stormwater discharging tosurface water, shall be documented in the SPPP and shall includeat a minimum the following BMPs:

a) Non-Stormwater Discharges into Storm Sewers

The facility shall ensure that it does not generate anddischarge, through storm sewers to surface waters, anydomestic wastewater, non-contact cooling water, treatedgroundwater or process wastewaters unless that discharge isauthorized by this or another NJPDES permit or identified inan application or request for authorization submitted foranother NJPDES permit.

b) Removal, Cover or Control of Industrial Activities

Except as specified and required in Part IV-RF of the permitfor certain, specific exposures of source materials, allother source materials shall be moved indoors, covered,used, handled, and/or stored in a manner so as to minimizecontact with stormwater that is discharged to surface water. UEach BMP that prevents such contact shall be identified anddiscussed in the SPPP.

c) Diverting Stormwater

Approved diversion of contaminated stormwater to either adomestic or industrial wastewater treatment plant may alsobe considered when choosing an appropriate BMP wherefeasible. (Diversion to groundwater may require a separateNJPDES permit. Consult the Department's Bureau ofOperational Groundwater Permits at (609) 292-0407.)

d) Spill Prevention and Response

Areas where actual or potential spills of source materialsare exposed to stormwater discharges can occur, and theiraccompanying drainage points shall be identified clearly inthe SPPP. Where appropriate, specific material handlingprocedures, storage requirements and use of equipment suchas diversion valves shall be developed and practiced toprevent and/or eliminate spills and/or leaks of source

DRAFT - FOR DISCUSSION PURPOSES ONLY

O 0art IV-RFPermit No.NJ0025411Page 7 of 13 Pages

materials from being exposed to stormwater. Procedures forcleaning up spills shall be specifically included in theplan and made available to the appropriate personnel throughscheduled employee training. In addition, the facilityshall provide or otherwise make available to its personnelthe appropriate and necessary spill cleanup equipment toeffect-an immediate and thorough spill cleanup.

e) Good Housekeeping

The SPPP must include a good housekeeping program to helpmaintain a clean and orderly work place. For certainactivities or areas, the discharge of stormwater exposed tosource materials may be prevented merely by using goodhousekeeping methods. The following are some simpleprocedures that a facility can consider incorporating intoan effective good housekeeping program:

(i) conduct cleanup immediately after discovery of leaksand spills;

(ii) implement careful material storage practices;(iii) improve operation and maintenance of industrial

machinery and processes;(iv) maintain up-to-date material inventory;(v) maintain well organized work areas;(vi) provide regular pickup and disposal of waste

materials;(vii) maintain dry and clean floors and ground surfaces by

using brooms, shovels, vacuum cleaners, or cleaningmachines; and

(viii) train employees about good housekeeping practices.

f) Preventative Maintenance

The SPPP shall include a Preventative Maintenance Program toinclude timely and regular inspections and maintenance ofstormwater management devices (e.g., cleaning oil/waterseparators, catch basins, drip pans, detention basins,covers, treatment units) and routine inspections of facilityequipment and operations to detect faulty equipment.Equipment (such as tanks, piping, containers, and drums)should be checked regularly for signs of deterioration..

0DRAFT - FOR DISCUSSION PURPOSES OSLY

0 9 art IV-RFPermit No.NJ0025411Page 8 of 13 Pages

g) Inspections and Evaluation Process

(i) Regular Inspections

The SPPP shall require regular inspections of thefacility's equipment, exposed source materials andindustrial areas to provide that all elements of theSPPP are in place and working properly. Inspectionsshall be conducted by qualified, trained plantpersonnel. Records of these inspections shall be.kept onsite with the SPPP. These inspection recordsshall consist of the following, at a minimum; date ofinspection; location of and problem(s) identified;steps taken to correct problem(s) and preventrecurrence; and the inspector's name(s) and title(s).In addition these Inspection records shall record anyincidents such as leaks or accidental discharges, andany failures or breakdowns of structural BMPs.

(ii) Annual Inspections

The SPPP shall require an annual inspection of theentire facility in accordance with Item l.B.3. below.

(iii) Evaluation Process

The SPPP. shall include a system to routinely andcontinually evaluate the SPPP for effectiveness, anyflaws that may have developed, and maintenance thatmay be required.' The routine evaluation mustinclude, but not be limited to, regular and annualinspections, inspection logs and records, internalreporting, plan revisions to correct any flawsdetected in the SPPP or to reflect changes/additionsat the facility, and logs of preventative maintenanceperformed at the facility. In addition, the AnnualReports and Certifications'required under Item 1.B.3.are integral to the evaluation process.

6. Implementation Schedule

The SPPP shall include an implementation schedule for allstructural and non-structural BMPs including a schedule(s) for

DRAFT - FOR DISCUSSION PURPOSES ONLY

'Part IV-RFPermit No.NJ0025411Page 9 of 13 Pages

removal, coverage, minimization of exposure of source material tostormwater, and/or stormwater diversion or treatment. Theschedule shall meet the deadlines established in the permit inaccordance with Item 1.B.2. below.

Upon completion of the initial SPPP, those BMPs (e.g. spillresponse, good housekeeping) that may readily be implementedshall be done so within 30 days, if not already practiced.

7. General Plan Requirements

This section provides additional requirements on theadministrative requirements related to finalizing the SPPP. Itcovers required signatures and requirements for plan location andaccess.

a) Required Signatures for the SPPP and StormwaterCertifications

The SPPP and Stormwater Certifications shall be signed as* follows:

(i) for a corporation, by a principal executive officerof at least the level of vice president;

(ii) for a partnership or sole proprietorship, by ageneral partner or the proprietor respectively;

(iii) for a municipality, State, Federal or other agency,by either a principal executive officer or a rankingofficial; or

(iv) for i., ii or iii. above, by a duly authorizedrepresentative, provided that: the representative-is.authorized by a person described in i, ii or iiiabove; this authorization specifies either anindividual or a position responsible for the overalloperation of the regulated facility or activity

.(e.g., plant manager, superintendent); and thewritten authorization is submitted to the Department.

b) Plan Location and Public Access

(i) The SPPP and, inspection and preventative maintenancerecords or logs shall be maintained onsite at alltimes. These documents must be made available, upon

DRAFT - FOR DISCUSSION PURPOSES ONLY

O•t IV-RFPermit No.NJ0025411Page 10 of 13 Pages

request, to a representative of the Department and tothe owner and operator of any municipal separatestorm sewer receiving the stormwater discharge.

(ii) A copy of the SPPP shall be submitted to the RegionalWater and Hazardous Waste Enforcement Offices, theBureau of Standard Permitting, and to theDepartment's Central File Room. Updates of thefacility's SPPP shall be submitted annually.

8. Special Requirements

a) Facilities Subject to Emergency Planning and CommunityRight- to-Know Statute

For facilities subject to the Emergency Planning andCommunity Right-to-Know Act (EPCRA) Section 313, the SPPPshall include, or cite the location of, any spill reportsprepared under that Act.

b) Facilities with SPCC Plans, DPCC Plans, or DCR Plans

The SPPP shall include, or cite the location(s) of, anySpill Prevention Control and Countermeasure Plan (SPCC Plan)prepared under 40 CFR 112 and section 311 of the Clean WaterAct, 33 U.S.C.§1321; and any discharge prevention,containment and countermeasure plan (DPCC plan) anddischarge cleanup and removal plan (DCR plan) prepared underN.J.A.C. 7:1E.

c) Facilities Undergoing Construction Activities

Whenever construction activities are undertaken at thefacility, the SPPP shall be amended, if necessary, so thatthe SPPP continues to be accurate and to meet therequirements of this permit.

S

DRAFT - FOR DISCUSSION PURPOSES ONLY

0 rt IV-RFPermit No.NJ0025411Page 11 of 13 Pages

* B. Compliance

FREQUENCY METHOD OF REPORTING

Develop SPPP EDP + 6 months Stormwater CertificationSubmission of SPPP

Implement SPPP within 3 months of Stormwater Certification

Department approval *

Inspections and EDP + 18 months Stormwater CertificationReports Annually thereafter Stormwater Inspection

Report* Except for those BMPs (e.g., spill response, good

housekeeping) that can be readily implemented in 30 days inaccordance with Item 1.A.5. above.

1. Development of SPPP

The SPPP shall be developed by EDP + 6 months. The planmust address all areas where industrial activity takesplace. The plan shall be prepared in accordance with goodengineering practices, and shall include, at a minimum, allthe items and information identified in Item 1.A above. Theplan shall identify existing BMPs and additional BMPs.Existing BMPs shall be continued or replaced with equally ormore effective BMPs. The SPPP shall be signed according toItem i.A.7.a., an original retained at the facility forNJDEP inspection, and a copy sent by certified mail to thefollowing:

NJDEP NJDEPSouthern Bureau of Water and Central File RoomHazardous Waste Enforcement CN-420 ,

Suite 301 South Trenton, NJ20 E. Clementon Road 08625-0420Gibbsboro, NJ 08086 Attn: Susan CarsonAttn: Chief

The permittee shall also submit the following certificationto the Bureau of Permit Management on the Monitoring Report- Transmittal Sheet by EDP + 6 months:

"I certify that the stormwater pollution preventionplan (SPPP) has been signed and a working copy retainedat the facility in accordance with Part IV-RF of

DRAFT - FOR DISCUSSION PURPOSES ONLY

Srt IV-RFPermit No.NJ0025411Page 12 of 13 Pages

NJPDES/DSW permit No.NJ0025411 and that this SPPP willbe fully implemented at the facility in accordance withthe terms and conditions of that permit. A copy of thesigned SPPP has been sent by certified mail to theNJDEP, Southern Bureau of Water and Hazardous WasteEnforcement, to the NJDEP, Bureau of StandardPermitting, and to the NJDEP, Central File Room."

2. Implementation of SPPP

The SPPP shall be implemented within 3 months ofDepartmental approval. The plan shall be implemented inaccordance with good engineering practices, and shallinclude, at a minimum, all the items and informationidentified in Item l.A above. The permittee shall submitthe following certification to the Bureau of PermitManagement on the Monitoring Report - Transmittal Sheetwithin 3 months of Departmental approval:

"I certify that the stormwater pollution preventionplan (SPPP) has been and will continue to be fullyimplemented at this facility in accordance with the 0terms and conditions of Part IV-RF of NJPDES/DSW permitNo.NJ0025411. A copy of the signed SPPP has been sentby certified mail to the NJDEP, Southern Bureau ofWater and Hazardous Waste Enforcement, to the NJDEPBureau of Standard Permitting, and to the NJDEP,Central File Room on (provide date).."

3. Inspections and Reports

Once the SPPP has been implemented in accordance with thispermit, the permittee shall conduct annual inspections ofthe facility to assess all areas contributing to thestormwater discharge authorized by this permit and toevaluate whether the SPPP complies with, and is implementedin accordance with, this permit, and whether additionalmeasures are needed to meet the conditions of this permit.A summary of each inspection shall be included in the SPPP.

DRAFT - FOR DISCUSSION PURPOSES ONLY

tart IV-RFPermit No.NJ0025411

Page 13 of 13 Pages

The permittee shall submit the following certification tothe Bureau of Permit Management on the Monitoring Report -

Transmittal Sheet by EDP + 18 months and annuallythereafter:

"I certify that the facility has been inspected toidentify areas contributing to the stormwaterdischarge(s) authorized under NJPDES/DSW permitNo.NJ0025411 and to evaluate whether the stormwaterpollution prevention plan (SPPP) prepared under thatpermit complies with.Part IV-RF of that permit and isbeing properly implemented."

The permittee shall prepare a report by EDP + 18 months andannually thereafter summarizing the inspection. This reportshall include the date of inspection and name(s) andtitle(s) of the inspector(s) and shall accompany thecertification above that the facility is in compliance withits SPPP and this permit, except that if there are anyincidents of non-compliance, those incidents shall beidentified in the certification. If there are incidents ofnoncompliance, the report shall identify the steps beingtaken or taken to remedy the noncompliance and to preventsuch incidents from recurring. The report and certification.shall be signed in accordance with Item 1.A.7.a. of this.permit, and a copy shall be maintained onsite for a periodof five years. This period may be extended by writtenrequest by the Department at any time.

DRAFT - FOR DISCUSSION PURPOSES ONLY

NON"PSEG,katei of dNef XJersie

James E. McGreevey Department of Environmental Protection Bradley M. CampbellGovernor Division of Water Quality Commissioner

P.O. Box 029 Trenton, NJ 08625-0029Phone: (609) 2924860

Fax: (609) 984-7938CERTIFIED MAIL NOV 0 7 2002RETURN RECEIPT REQUESTED

Ed KeatingPSEG Nuclear LLCP.O. Box 236 / N21, Alloway Creek Neck RoadHancocks Bridge, NJ 08038

Re: Draft Surface Water Renewal Permit ActionCategories: B, RFN-JPDES Permit No. NJ0025411Hope Creek-Generating Station, Lower Alloways Creek, Salem County

Dear Mr. Keating:

Enclosed is a draft New Jersey Pollutant Discharge Elimination System (NJPDES) permit action identified above whichhas been issued in accordance with N.JA.C. 7:14A. This pennit action authorizes discharge activities applicable to the

. discharge categories identified above.

O Notice of this draft permit action will appear in Today's Sun1-n and in the November 13, 2002 DEP Bulletin. The DEPBulletin is available on the internet at http://www.state.nj.us/dep/bulletin or by contacting the DEP DocumentDistribution Center at (609) 777-4398. In accordance with N.JAC. 7:14A-15.10(c) 1i, the public comment period will dosethirty days after its appearance in the newspaper.

As detrled in the DEP Bul-ltin and aforementioned newspaper written comments or a request that the Department hold anon-adversarial public hearing on the draft document must be submitted in writing to Pilar Patterson, Chief, Bureau ofPoint Source Permitting - Region 2, P.O. Box 029, Trenton, NJ 08625 by the close of the public comment period. Allpersons, including the applicant, who believe that any condition of this draft document is inappropriate or that theDepartment's tentative decision to issue this draft document is inappropriate, must raise all reasonable arguments andfactual grounds supporting their position, including all supporting materials, during the public comment period.

The NJDEP will respond to all significant and timely comments upon issuance of the final document. The pernittee andeach person who has submitted written comments will receive notice of the NJDEP's final decision to issue, revoke, orredraft the document.

If you have questions regarding the draft action, please contact Susan Rosenwinkel (609) 292-4860 concernng anychemical-specific conditions and Shashi Nayak at (609) 633-7021 concerning any stormwater conditions.

Sincerely,

i Meisse Carasia AuritiSupervising Environmental SpecialistBureau of Point Source Permitting Region 2

Enclosuresc: Permit Distribution List, Masterfile #: 15647; PI # 46815

New Jersey is an Equal Opportuniry Employer

perdtcv.rtf Recycled Paper

HOPE CREEK GENERATING STATION NJPDES Permit Number: NJ0025411Surface Water Renewal Permit Action Program Interest Number: 46815

N

Table of Contents

This permit package contains the items listed below:

1. Cover Letter

2. Table of Contents

3. Public Notice (Included in draft permit only)

4. Fact Sheet / Statement of Basis (Included in draft permit only)

5. NJ-PDES Permit Authorization Page

6. Part I - General Requirements: NJPDES

7. Part II - General Requirements: Discharge Categories

8. Part Ill - Limits and Monitoring RequirementsI

9. Part IV - Specific Requirements: Narrative

10. Attachment 1 - Contents of the Storinwater Pollution Prevention Plan (SPPP)

11. Attachment 2 - SPPP Preparation Certification

12. Attachment 3 - SPPP Implementation and Inspection Certification

toc dsw.rtf .

0 0I..

Aloway Creek NoHancocks Bridge

Salem CountyNJ0025411

DSW Major

Susan Kosenwinkel

Bureau of PointSource PermittingRegion 2

(609) 292-4860

elaware

Zone 5

Delaware River Basin

The proposed permit action is a renewal permit to authorize the discharge otwastewater through several outfalls as well as the intake of Delaware Riverwater for use in the permittee's process. DSN 461A discharges approximately46.9 million gallons per day of cooling tower blowdown as well as wastewaterfrom two internal monitoring points DSN 462B and DSN 461C. DSN 462Bcontains treated sanitary wastewater whereas DSN 461C contains wastewaterthat has been routed through the oil water separator. This permit alsoauthorizes the discharge of stormwater through DSN's 463A (South YardDrain), 464A (Perimeter Drain) and 465A (North Yard Drain). A StormwaterPollution Prevention Plan and other requirements have been applied for thesethree outfalls.

New Jersey Department of Environmental ProtectionDivision of Water Quality

Bureau of Point Source Permitting Region 2

PUBLIC NOTICE

Notice is hereby given that the New Jersey Department of Environmental Protection (NJDEP) proposes to issuethe New Jersey Pollutant Discharge Elimination System (NJPDES) Discharge to Surface Water (DSW) PermitNJ0025411 in accordance with N.J.A.C. 7:14A-1 et se., and by authority of the Water Pollution Control Act atN.J.S.A. 58: 10A-1 et seý.. for the following discharge:

Applicant or Permittee FacilityPSEG Nuclear LLC Hope Creek Generating StationPO BOX 236/N2 1, Alloway Creek Neck Road Artificial Island, Alloway Creek Neck RoadHancocks Bridge, NJ 08038 Lower Alloways Creek, NJ 08038-0000

The applicant operates an existing electric generating station (Standard Industrial Classification code 4911)consisting of one nuclear powered boiling water reactor which is operated with a recirculating cooling watersystem (i.e. cooling tower).

Discharge serial number (DSN) 461A is the discharge from the recirculating cooling water system that consists ofapproximately 46.9 million gallons per day (MGD) of cooling tower blowdown which is chlorinated thendechlorinated prior to discharge. DSN 461A also contains limited quantities of treated wastewater from theinternal monitoring points DSN 461C and DSN 462B. DSN 461C (an internal monitoring point) dischargesapproximately 0.04 MGD from the low volume oily waste system which has first been treated by an oil/waterseparator prior to combining with DSN 461A. DSN 462B (an internal monitoring point) dischargesapproximately 0.02 MGD of sewage treatment plant effluent. Sanitary wastewater is generated on-site from theSalem and Hope Creek facilities and is then treated by oxidation, clarification, settling, sand filtration and Wchlorination. After all treatment, this sanitary, wastewater effluent is discharged through DSN 462B (an internalmonitoring point) and combines with DSN 461A. DSN 461A discharges to Zone 5 of the Delaware River.

This permit also authorizes discharges from DSNs 463A (South Yard Drain), 464 (Perimeter Drain) and 465(North Yard Drain). These outfalls discharge primarily stormwater where monitoring conditions and StormwaterPollttion Prevention Plan requirements have been included for such.

Modification provisions as cited in the permit may be initiated in accordance with the provisions set forth in PartIV and upon written notification from the Department.

A draft NJPDES permit renewal has been prepared for this facility based on the administrative record filed at theNJDEP, 401 East State Street, Trenton, New Jersey 08625. Copies of the draft document are obtainable, for anominal charge, and the administrative record is available for inspection by appointment only, Monday throughFriday. If you are interested in scheduling an appointment or requesting specific information regarding the draftdocument, contact Susan Rosenwinkel of the Bureau of Point Source Permitting Region 2 at (609) 292-4860.

Written comments must be submitted in writing to Pilar Patterson, Chief, or-Attention: Comments on PublicNotice NJ002541 1, Bureau of Point Source Permitting Region 2, P.O. Box 029, Trenton, NJ 08625 by the closeof the public comment period, which closes thirty calendar days after publication of this notice in the newspaper.All persons, including the applicant, who believe that any condition of this draft document is inappropriate or thatthe Department's decision to issue this draft document is inappropriate, must raise all reasonable arguments andfactual grounds supporting their position, including all supporting materials, during the public comment period.

The NJDEP will respond to all significant and timely comments upon issuance of the final document. Thepermittee and each person who has submitted written comments will receive notice of the Department's permitdecision. •

Pbntdsw.rtf.

Fact SheetPage I of 28

NJPDES # : NJ0025411

New Jersey Department of Environmental ProtectionDivision of Water Quality

Bureau of Point Source Permitting Region 2-Bureau of Non-Point Pollution Control

Masterfile #: 15647 PI #: 46815

This fact sheet sets forth the principle facts and the significant factual, legal, and policy considerations examinedduring preparation of the draft permit. This action has been prepared in accordance with the New Jersey WaterPollution Control Act and its implementing regulations at N.J.A.C. 7:14A-! et seq. - The New Jersey PollutantDischarge Elimination System.

PERMIT ACTION: Surface Water Renewal Permit Action

The permittee has applied for a New Jersey Pollutant Discharge Elimination System (NJPDES) Surface WaterRenewal Permit Action through an application dated September 25, 2001.

Name and Address of the Applicant:

PSEG Nuclear LLCPO Box 236/N21Alloway Creek Neck RoadHancocks Bridge, NJ 08038

Name and Address of the Facility/Site:

Hope Creek Generating StationArtificial IslandAlloway Creek Neck RoadLower Alloways Creek, Salem County, NJ 08038

Discharge Location and Discharge Component Information:

Outfall:DischargeComponents:

ReceivingWater:Via:Classification:County: 'Municipality:WMA*"Watershed:Subwatershed:HUC 14:Latitude:

-) Longitude:

461ACooling Tower Blowdown aswell as discharges from 461B,462B and 461C.Delaware River

PipeZone 5SalemLower Alloways Creek17Delaware RiverHope Creek / Artificial Island02040206060100390 28' 14"750 32' 34"

Ouffall:DischargeComponents:

ReceivingWater:Via:Classification:County:Municipality:WMA*:Watershed:Subwatershed:HUC 14:Latitude:Longitude:

46 1C (internal monitoring point)Low Volume and Oily Waste System

Combines With 461A

PipeZone 5SalemLower•Allow-ays Creek17Delaware RiverHope Creek / Artificial Island02040206060100390 28' 14"750 32' 34"

Fact dsw.rtf

Fact SheetPage 2 of 28

NJPDES #: NJ00254 I1

Outfall:

DischargeComponents:

ReceivingWater:Via:

Classification:County:Municipality:WaMA*:Watershed:Subwatershed:

HUC 14:Latitude:

Longitude:

462B (internal monitoringpoint)Effluent from On-site SewageTreatment Plant

Combines with 46 1A

Pipe

Zone 5SalemLower Alloways Creek17Delaware RiverHope Creek / Artificial Island02040206060100390 28' 14"

750 32' 34"

Outfall:

DischargeComponents:

ReceivingWater:Via:

Classification:County:Municipality:WMA*:

465A, 463A, 464

Stormwater from North Yard Drain(465A), South Yard Drain (463A),Perimeter Drain (464)Delaware River

Pipes (DSN's 465-A, 463A)Ditch (DSN 464)Zone 5SalemLower Alloways Creek17

Watershed: Delaware RiverSubwatershed: Hope Creek / Artificial IslandHUC 14: 02040206060100Latitude: 390 28' 14" (465A)

390 27' 54" (463A)390 28' 15" (464)

Longitude: 750 32' 34" (465A)750 32' 23" (463)750 32' 34" (464)

* "WMA" means Watershed Management Area

fl Facility Overview:

The facility is classified as a major discharger by the Department of Environmental Protection (NJDEP) in accordancewith the United States Environmental Protection Agency (EPA) rating criteria. The facility's estimated combined longterm average flow is 48.2 million gallons per day (MGD).

The Hofpe Creek Generating Station, hereafter "Hope Creek" or "The Station" is located in Lower Alloways CreekTownship, Salem County, New Jersey, at River Mile 51 on the Delaware River Estuary, 17 miles south of theDelaware Memorial Bridge. The Station is located on a projection of land known as Artificial Island on the easternshore of the Delaware Estuary. The estuary in the area of the Station is approximately 2.5 miles wide. The tidal flowof the estuary past the Station is approximately 400,000 cubic feet per second (cfs) or 259,000 million gallons per day(MGD). The estuary in the vicinity of the station is characterized by variable salinity, tidal currents and a highquantity of particulate material suspended in the water column.

Hope Creek is a single unit nuclear power steam electric generating facility. In addition to the generating station, theHope Creek site contains associated buildings and structures, a sewage treatment plant, an electrical switchyard,parking areas, roads, and equipment laydown areas. Riprap and bulkheads protect the shore from erosion. HopeCreek Unit 1 is a boiling water reactor design. The boiling water reactor has two major cooling systems, namely thereactor system and the cooling water system. Hope Creek operates with a non-contact, closed cycle cooling watersystem.

The construction of Hope Creek was completed in 1986 and the Station has a US Nuclear Regulatory Commission(USNRC) license to operate until 2026. Hope Creek is designed to operate continuously at the licensed thermal

)power rating -as a base-loaded electrical generating unit. Hope Creek's electrical output is approximately 1049Megawatts Electric net Maximun Dependable Capacity (MDC), which reflects the 1.4 % increase in power licensedby the USNRC.

Fact dsw.rtf.

Fact SheetPage 3 of 28

NJPDES # NJO02541 I

As described in the permittee's application, the nuclear reaction process produces heat which is transferred to theWreactor water that creates steam in the reactor vessel. The steam enters the high-pressure turbine, then the three low~

pressure turbines which causes them to rotate. This rotation is transferred to the generator which generates electricity.The exhausted steam leaves the turbines and enters the main condenser, where it is condensed by cooling from thecirculating water system that is contained inside the condenser tubes. As this is a non-contact cooling water system,the steam and circulating waste are isolated from each other. The condensed steam is purified and returned to thereactor for reuse in the generation of steam.

Several figures and diagrams have been included in an effort to better describe the facility. These include a SiteLocation Map, Schematic of Water Flow for the Facility, General Site Map, Diagram of a Cooling Tower, Diagram ofthe Service Water Intake, Schematic for DSN 461A, and Schematic for DSN 462B. All figures have been includedat the end of this Fact Sheet.

Summary of Station Cooling Water Systems, Station Intakes and Wastewater Components:

Circulating Water System and Cooling Tower OperationThe circulating water system is a non-contact cooling water system that transports excess heat from the. condensers tothe cooling tower for dissipation. The cooling tower is a natural draft, counterfiow, evaporative type which is 432 feetin diameter at the base and 512 feet high. The cooling tower basin contains approximately 9 million gallons of waterand, with the volume of the circulating water system, provides an operating volume of I11 million gallons. In thecirculating water system, the four circulating water pumps draw water from the cooling tower basin, pump the waterthrough the main condensers, where it picks up excess heat from the steam, and return the circulating water to thecooling tower above the fill through a distribution system. As the circulating water falls back to the cooling tower~basin over the fill, heat is transferred from the circulating water to the air that is naturally drafted counter to the

SCirculating water flow. This transfer of heat allows, the circulating water to be reused. Since there is some evaporativeW"loss, solids from the* Delaw.are Estuary concentrate in the cooling tower basin and continuous blowdown is used to

control this concentration. Makeup water to replace the evaporative* losses and the continuous blowdown back to theDelaware Estuary is provided by the service water system.

The function of the cooling tower is to reduce the temperature of the circulating water entering the cooling tower to alower temperature, so that it can be recycled for further use. Natural draft cooling towers are essentially static deviceswhich rely on the design of the' tower and operation of the laws of thermodynamics to accomplish the cooling ofcirculating Water. The cooling tower is least efficient for removing heat when the wet bulb temperature is high and therelative humidity is low. The cooling tower utilizes tool ambient air in such a way that the heat is transferred from thehot water to the cool air through both latent heat transfer and, to a lesser extent, sensible heat transfer. When warmwater contacts cool air in the tower, the air is warmed because it receives sensible heat from the water; the water, inturn, loses sensible heat and is cooled. As the air is warmed, it also becomes lighter. The difference in specific weightbetween the air inside and outside the cooling tower causes the natural draft effect through the tower. The actualtransfer of heat from the water to the air is accomplished primarily in the fill, where warm water is passed downwardin very thin films through a stream of air moving upward as a result of the natural draft. The fill is designed tomaximize the surface area of the water exposed to air, thereby maximizing the. amount of evaporation that occurs. Thewarmed, moist air is then drawn upward through the drift eliminators which contain wave-shaped passages designedto reduce the amount of water leaving the tower as droplets with the warmed air. By causing the air to changedirection, the drift eliminators collect many of the water droplets carried by the air. The warm air is then dischargedinto the atmosphere and cooled water falls to the cooling tower basin to be recycled in this closed-loop coolingsystem.

Service Water SystemO )The service water system provides Estuary water to cool the Safety Auxiliary Cooling System and the. ReactorAuxiliary Cooling System heat exchangers. The safety auxiliary cooling system is a nuclear safety-related coolingsystem designed to provide cooling water to the engineered safety features. equipment during normal and emergency

Fact-dsw.rtf

Fact SheetPage 4 of 28

NJPDES # : NJ002541 I

plant conditions. The reactor auxiliary cooling system provides cooling water to the reactor subsystems during normal"plant operations. After cooling these two systems, the service water is directed to the cooling tower basin for makeup

water. If the cooling tower is not in service, the service water can bypass the cooling tower and discharge directly tothe cooling tower blowdown line.

Service Water System IntakeThe service water intake structure is located on the shoreline, approximately 800 feet due west of the reactor building.The intake occupies approximately 112 feet of shoreline, extends 75 feet inland, and rises 35 feet above grade(excluding the gantry crane). The west face of the intake is parallel to and flush with the shoreline. The intakestructure is constructed of reinforced concrete and seismically designed for nuclear safety purposes. The intakeconsists of eight bays where four of the bays are used to support Hope Creek, the other four bays were designed forthe cancelled Hope Creek Unit 2 and are idle. The front of the intake contains a continuous line of trash racks andassociated trash rakes and a skimmer wall. Each of the eight bays is equipped with its own traveling screen, servicewater pump, service .water strainer, and associated equipment. A description of the intake structure components isincluded below.

" Trash RacksThe trash racks are located in front of the intake structure to prevent heavy debris from entering the intake anddamaging the traveling screens. They are constructed of coated carbon steel, three inches deep and 0.75 inch wideand are set on three inch centers. Mechanical rakes remove collected debris which is aggregated in trash containersfor off-site disposal. The bottom of the trash racks, are at elevation 70 ft (PSD). Velocity through the trash racks isapproximately 0.1 foot per second. The skimmer wall is designed to prevent the entrance of an oil slick or ice,velocity under the skimmer wall is approximately 0.35 .foot per second.

0 Traveling ScreensAfter passing through the trash racks, intake water flows through vertical traveling screens of a modified Ristroph Wdesign at approximately 0.39 ft/sec. Each traveling screen is a continuous linkage of framed baskets. Each basket isapproximately 2.5 feet high and 8.33 feet wide and the screening material is No.14 W&M gage monel wire meshwith 0.375 inch square openings. Each basket has a trough (fish bucket) on the lower lip designed to prevent re-impingement of fish and provide the mechanism to return fish to the Delaware Estuary. The fish buckets alloworganisms to remain in the water while being lifted to the fish return trough. As the traveling screen panel travelsover the head sprocket of the traveling screen, low pressure sprays (less then 20 psi) wash the organisms into the

.fish return trough. As the traveling screen panel, traverses further, high pressure sprays (approximately 90 psi)remove the remaining debris into the debris trough. The fish and debris troughs are combined and returned to theDelaware Estuary at a distance from the intake to reduce the potential for re-impingement on the screens.

" Service Water PumpsAfter passing through the traveling screen, the intake water enters the respective service water pump. Each servicewater pump is a vertical, wet-pit, turbine type, centrifugal pump rated at 16,500 gallons per minute. Sodiumhypochlorite is continuously added at the suction of the service water pumps as a biocide to prevent.fouling.

* Service Water StrainersService water next passes through the service water strainers where smaller particles and debris are removed. Theservice water strainers are full-flow, self-cleaning, strainers withnominally 250-380 micron elements. The strainerscontinuously backwash when the associated service water pump is operating and the backwash water is dischargedin the debris trough. Strainer backwash water, traveling screen spray wash, and service water pump bearinglubrication water are drawn from the system after the service water strainers.

Miscellaneous Components that Discharge to the Receiving WatersAny leakage or drains within the building which houses the service water pumps, screens, strainers, and associatedequipment is directed to the building sumps which discharge to the Delaware Estuary along with the traveling w

Fact dsw.rtf

Fact SheetPage 5 of 28

NJPDES # : NJ002541 1

screen and strainer backwash waters. Since sodium hypochlorite is added to the suction side of the service waterpumps, residual chlorine may be present in the service water used to wash the screens and strainers or the sumps.

Wastewater Components for the Station - Station Outfalls and Discharge ComponentsThere are four outfalls associated with this facility and three internal monitoring points. Considering all theseoutfalls and internal monitoring points, only three outfalls/internal monitoring points have been assigned numericalpermit limitations. A description follows later in this fact sheet regarding the basis for regulation of each of thesepoints. Other outfalls are regulated by a separate authorization for stormwater or are covered by other monitoringpoints. While the permittee's stormwater discharges are currently regulated under Stormwater Pollution PreventionPlan requirements, the Department has determined it appropriate to regulate the stormwater discharges under theGeneral Stormwater Permit NJ0088315 which will be issued upon finalization of this draft renewal permit.

A tabular summary of each outfall and/or internal monitoring point is included below followed by a description:

Discharge Name of Operation or Discharges Requirements Imposed? EffluentSerial Process to: flow (MGD)Number461A Cooling Tower Blowdown Delaware Requirements imposed at DSN 461A. 46.9

River461B Liquid Rad Waste System DSN 461A Requirements imposed at DSN 461A. 0.06461C Low Volume and Oily DSN 461A Requirements imposed at internal 0.04

Waste System - -monitoring point DSN 46 1C.465A North Yard Drain Delaware Requirements imposed at DSN 465A. 0.24

River462B Sewage Treatment Plant DSN 461A Requirements imposed at internal 0.02

monitoring point DSN 462B.463A South Yard Drain Delaware' Requirements imposed at DSN 463A. 0.51

River464A Perimeter Drain Delaware . Requirements imposed at DSN 464A. 0.41

River

Discharge Components of DSN 461A:The discharge flow from DSN 461A consists of cooling tower blowdown (46.9 MGD) with minor waste streamcontributions from the Low Volume and Oily Waste System (DSN.461C, 0.04 MGD), liquid radioactive waste system(DSN 461B, 0.06 MGD), and the Sewage Treatment System (DSN 462B, 0.02 MGD) as shown in the schematic forDSN 461A at the end of this fact sheet. Sediment which collects in the cooling tower basin is removed as necessaryfordisposal at an onsite dredge spoil area.

Service water is withdrawn through the service water intake as cooling tower make-up water (evaporative loss, fromthe cooling tower is 13 MGD). The service water entering the cooling tower is chlorinated to prevent biofouling,using sodium hypochlorite, at the service water intake. Additional sodium hypochlorite is added to the cooling towerbasin to prevent biofouling and biological growth. Ammonium bisulfite is added-in the-cooling tower blowdown todechlorinate the cooling tower blowdown before discharge to the Delaware Estuary. Sodium hydroxide is added to thecooling tower basin to protect the cooling tower structure and components. Boron used in the Station can enter thecirculating water, primarily in the condenser bay dewatering sump, and is discharged in the cooling tower blowdown.The station is equipped with a deicing line, which allows a small amount of heated water from the circulating watersystem or service water system to be directed to the service water intake to prevent icing during harsh winterconditions. This flow path bypasses the dechlorination system but is infrequently used and most of the water used fordeicing is returned to the system through the service water pumps.

Fact dsw.rtf

Fact SheetPage 6 of 28

NJPDES # NJ0025411

Discharge Components of DSN 461B:,"The liquid radioactive waste system is a low volume (0.06 MGD) wastewater source which mixes with the coolingtower blowdown, prior to the effluent monitoring point at DSN 461A. The liquid radioactive waste system is designedto process liquid waste streams from inside power generation facilities that may potentially contain radioactivity.PSEG states in its application that the treatment system contains all necessary equipment to meet both U.S. NuclearRegulatory Commission (USNRC) standards for the discharge of radioactivity and the applicable New Jersey StateWater Quality Standards. Much of the wastewater processed through the system is recycled back into a 500,000gallon condensate storage tank for reuse by the reactor water makeup systems.

The influent waste streams at DSN 461B include the following systems: equipment drain wastes; floor drain wastes;high conductivity wastes; chemical wastes; and detergent wastes. PSEG also states in its application that treatment ofliquid radioactive waste system influent is dependent on the source and type of wastewater received. Each of the five.types of influent waste streams is processed differently and can be routed through various components of thetreatment system. Wastewater is treated in a batch mode and not all wastewater is routed through every component ofthe treatment system. The various subsystems of the LRW treatment system have numerous cross connections toallow -operating flexibility. Wastewaters can also berecirculated back to collection tanks for reprocessing as needed.

Discharge Components of DSN 461C:The discharge from the internal monitoring point DSN 461C consists of effluent from the low volume oily wastesystem (0.04 MGD). The low volume oily waste system collects and treats potentially oily wastewater from area,building, and equipment drains throughout the site as well. as auxiliary boiler blowdown 'and miscellaneousstormwater sources. Most flows to the system are intermittent. Flows from containments and dikes are primarilyprecipitation but may include circulating or service water. Wastewater from the system is collected in one of two liftstations which have level operated pumps to transfer the wastewater to the treatment system. Collected waste streamsare processed through an API type oil water separator for removal of solid and floatable materials. Settleable solidsare removed from the waste stream by gravity separation and are transferred to the waste oil sludge holding tank. Ifthe residuals contain low levels of radioactivity, they are removed and disposed of at a USNRC licensed facility. Ifthe residuals do not contain low levels of radioactivity, they are removed and trucked offsite to a licensed disposal* facility. The system also has provisions for recycling of this sludge to aid in settling of influent wastewaters. Treatedeffluent is then discharged through the internal monitoring point DSN 461C (for which effluent limitations andmonitoring requirements are specified) prior to mixing with DSN 46 IA for discharge.

Discharge Components of DSN 462B:The discharge from the internal monitoring point DSN 462B consists of treated domestic wastewater from the SewageTreatment System (0.02 MGD). Influent to this system consists of domestic wastewater from the Hope Creek andSalem facilities including administrative facilities and sewage holding facilities from unconnected buildings on-site.Influent wastewater and return activated sludge are introduced into the single channel oxidation ditch where extendedaeration is used to oxidize the organic constituents of the influent wastewater. This process acts to removebiochemical oxygen demand, reduce suspended solids, nitrify, and partially denitrify the wastewater. Rotor aeratorsare used to mix air into the contents of the basin and to keep the contents moving around the oxidation ditch.Following aeration, settling in the biological clarifiers is used to separate solids from the liquid flow. The settledsolids, or sludge, is either returned to the oxidation ditch or wasted to sludge holding tanks, based upon processrequirements. The liquid wastewater flows from the clarifiers to the sand filters or directly to the chlorinationfacilities. The deep-bed downflow gravity sand filters can be used to further reduce suspended solids. Filteredeffluent flows to the clearwell for use as filter backwash water or is discharged to the chlorination facilities. Thechlorination system is a flow-dependent tablet chlorination system (currently calcium hypochlorite tablets are used)followed by chlorine contact tanks to provide retention for the biocide to function. The effluent of the chlorinecontact tanks flows over a cascading weir to the effluent pump lift station. Level-controlled effluent pumps transfer

jthe treated water (0.02 MGD) to DSN 461A for discharge to the Delaware Estuary. Residual dechlorination chemical(ammonium bisulfite) that is in the cooling tower blowdown acts to dechlorinate the sewage treatment systemeffluent. Settled solids or sludge is removed from the waste stream to the sludge holding tank for aeration and

Fact dsw.rtf

Fact SheetPage 7 of 28NJPDES # : NJ002541 1

. dewatering before being trucked offsite to a licensed disposal facility. The sludge is sent to an USNRC-licensedfacility if the residuals contain low levels of radioactivity,

Yard Drains (DSN's 463A, 464A, 465A):The North Yard Drain (DSN 465A) collects and discharges (0.24 MGD) site drainage from the following areas: thefacility parking lots, centralized warehouse roof drain, loading ramp catch basins, auxiliary boiler roof drains, firewater pump house, No. 2 Reactor Building roof and area drains, materials center area and roof drains, constructionand excavation dewatering, and runoff from other miscellaneous sources. The North Yard Drain system may containprecipitation, river water or groundwater (including fresh water and potable water), but the effluent consists primarilyof Delaware Estuary water, largely due to the tidal influence. The sewage treatment system (DSN 462B) emergencyoverflow can discharge through this outfall but the sewage treatment system is monitored independently.Containments and other catch basins which collect precipitation or other sources of water are first evaluated forpollutants prior to any release to the North Yard Drain system.

DSN 465A had been identified as DSN 462A in the NJPDES permit application. The Department has renamed thisoutfall as DSN 465A. This change has been made because two ouffalls can not be assigned to the same numericaldesignation in the NJEMS database. In other words, the NJEMS database will not accept "DSN 462B" (which is thedesignation for the internal sanitary discharge monitoring location) and DSN 462A (North Yard drain discharge).Since DSN 462B has a regulatory history where limits and monitoring conditions have been set including thecollection of data, the Department has chosen to maintain this designation for DSN 462B, but to change thedesignation for DSN 462A to DSN 465.

The South Yard Drain (DSN 463A) collects and discharges (0.51 MGD) site drainage from the following areas: theSecurity Center roof, drain and parking lot, roof and area drains from the Administrative Building, Auxiliary Boiler,

*- Turbine Building, Reactor Building, Materials Center, and Services Facility Building, safety shower, as well as theChlorine Structure drains, service water valve pit, dewatering sump, construction and excavation dewatering, andrunoff from other miscellaneous sources. The South Yard Drain system may contain precipitation, river water orgroundwater (including fresh water and potable water), but the effluent consists primarily of Delaware Estuary water,largely due to the tidal influence. Containments and isolated catch basins, which collect precipitation or other sourcesof water, are first evaluated for pollutants then released to the yard drain system. The evaluation includes adetermination based on the source of the water and the potential for pollutant presence and then, if appropriate, thewater is analyzed prior to release. For example, the service water'sodium hypochlorite tank containment may containprecipitation, fresh water, and service water and contain low concentrations of chlorine residual. Service water canalso be discharged via DSN 463A on an emergency basis. This bypass discharge happens infrequently and has notoccurred since 1998.

The perimeter drain (DSN 464) collects and discharges (0.41 MGD) site drainage and runoff from the followingareas: access road area, Administration Building roof drains and parking lots, Combo Shop roof drains, catch basins inundeveloped portions of the site, groundwater infiltration, natural drainage from the adjacent marshes, and drainagefrom areas external to the Hope Creek site. Due to the facility elevations and proximity to the River, this outfall isalso tidally influenced.

Description of the Receiving Water and Outfall Locations:

Treated and untreated wastewater is discharged through discharge serial number (DSN) 461A to the Delaware River.The discharge through DSN 461A includes effluent from the internal monitoring points DSN 461B, 461C and 462B.The Delaware. River is classified as Zone 5 at the point of discharge in accordance with N.J.A.C. 7:9B- 1 et seq. Theoutfall configuration for DSN 461A is a 48" diameter pipe. The outfall is usually submerged and is only visible

) during low tide. The outfall extends approximately 10' offshore.

Fact dsw.rtf

Fact SheetPage 8 of 28

NJPDES # :NJ0025411

Stormwater is discharged through outfalls DSN's 465A, 463A and 464 to the Delaware River as described above. TheDelaware River is classified as Zone 5 at the point of discharge for DSN's 465A, 463A and 464. The outfall pipesfor DSN's 465A and 463A are 60" diameter pipes where the top of the pipe is just visible at mean water level andboth these pipes extend about 3' into the river. DSN 464 is a ditch along the northern perimeter'of the site.

A USGS quadrangle map indicating the location of the facility and discharge points is included at the end of this FactSheet.

Type and Quantity of the Wastes or Pollutants:

The Permit Summary Table at the end of this fact sheet contains a summary of the quantity and quality of pollutantstreated and discharged from the facility and the proposed effluent limitations. Effluent data was obtained from thefacility's Monitoring Report Forms f6r the time period specified in the table and the permittee's application.

Summary of Permit Conditions:

The existing and proposed effluent limitations and other pertinent information regarding the draft permit are describedbelow:

A.' Basis for Effluent Limitations and Permit Conditions - General:

The effluent limitations and permit conditions in this permit have been developed to ensure compliance with thefollowing:

1. NJPDES Regulations (N.J.A.C. 7:14A)2. New Jersey Surface Water Quality Standards (N.J.A.C. 7:9B)3. Requirements of the Delaware River Basin Commission (N.J.A.C. 7:9B-1.5(b)l)4. Wastewater Discharge Requirements (N.J.A.C. 7:9-5.1 et seq.),5. Secondary Treatment Standards (40 CFR Part 133, N.J.A.C. 7:14A-12.2 and -12.3)6. Existing permit limitations in accordance with N.J.A.C. 7:14A-13.19 and Section 402 of the federal Clean

r.,Water Act (antibacksliding requirements)7. Permit limitations in accordance with N.J.A.C. 7:9B-1.5(d) (antidegradation requirements)8. Statewide Water Quality Management Planning Rules (N.J.A.C. 7:15).9. Technology Based Treatment Requirements or Effluent Limitation Guidelines Requirements (N.J.A.C.

7:14A-13.2 to 13.4)10. Sludge Quality Assurance Regulations (N.J.A.C. 7:14C)

Technology based limitations are authorized by Section 301 of the Clean Water Act, 40 CFR 122, N.J.S.A. 58:1 OA-4,and N.J.A.C. 7:14A-13.2(a)l.ii., 13.3(b), and 13.4. In general, effluent limitations are based on Effluent LimitationGuidelines (ELGs), developed by the United States Environmental Protection Agency (USEPA), or on case-by-caselimitations developed through a Best Professional Judgment (BPJ) analysis in cases where ELGs are not available orappropriate. ELGs are minimum technology based requirements applicable on a nation-wide basis. ELGs considerthe category of industry that produce common pollutants taking into account the specific factors unique to a particulartype of industry (manufacturing process, type and quantity of pollutants generated, types of treatment facilitiesavailable to treat the pollutants, etc.). ELGs are published in 40 CFR Subchapter N. BPJ determinations areauthorized by Section 402 (a)(1) of the Clean Water Act.

In accordance with N.J.A.C. 13.5, Water Quality Based Effluent Limitations (WQBELs) are imposed when it has. been determined that the discharge of a pollutant causes an excursion of the New Jersey Surface Water Quality

Standards (SWQS), N.J.A.C. 7:9B-1.1 et seq., and the Federal Water Quality Standards, 40 CFR Part 131. WQBELsare authorized by Section 301 of the Clean Water Act, 40 CFR 122, N.J.S.A. 58:10A-4, and N.J.A.C. 7:14A- 13.2 and13.3. The policies used to develop WQBELs are contained in the State and Federal Standards. Specific procedures,

Fact dsw.rtf

Fact SheetPage 9 of 28

NJPDES # : NJ002541 1

O methodologies, and equations are contained in the current USEPA "Technical Support Document for Water Quality-\based Toxics Control" (TSD) (EPA- 505/2-90-001) and are referenced in N.J.A.C. 7:14A-13.5 and 13.6.

Expression of all effluent limitations is in accordance with N.J.A.C. 7:14A-13.14 and 13.15.

Whole effluent toxicity limitations are expressed as a minimum as a percent.

B. Basis and Derivation for Effluent Limitations - Specific:

Discharee Serial Number 461A

1. Flow - Intake and Effluent: This permit does not include a numerical limitation for effluent flow. Monitoringand reporting conditions for effluent flow as a monthly average and daily maximum are applied pursuant toN.J.A.C. 7:14A-13.13. Monitoring and reporting conditions for intake flow are being included to document thewithdrawal flow volumes which are a factor in the Department's determination under Section 316(b) of the CleanWater Act. Monitoring for both intake and effluent flow is required on a continuous basis using a flow meter.

2. Total Organic Carbon (TOC): Net TOC has been retained in this permit as a monitoring requirement. Dailymaximum and monthly average monitoring is required for Net TOC. Because this limit and monitoringrequirement is imposed on a net basis, gross and intake TOC values shall also be monitored and reported. TOCshall be monitored on a monthly basis where grab sample types shall be used for intake and effluent TOC. NetTOC values shall be calculated based on the equation included in Part IV.

The Department recognizes that the permittee has requested deletion, of the TOC limit and monitoringrequirement based on data (4/1/97 - 3/30/01) which shows an average net TOC value of - 0.02 mg/L and a

* maximum. net TOC value of 6.0 mg/L. While the Department agrees that recent data shows consistentcompliance with the permit limits, the Department has determined that TOC has the potential to be present in thedischarge due to the various additives the permittee uses in its cooling tower operation as well as in otherwastestreams that are discharged through DSN 461A. As such, the Department has determined it appropriate toretain the TOC monitoring requirements. The Department has also determined, that a monthly monitoringfrejquency is appropriate given the significant flow volume that is discharged through DSN 461 A.

3. Temperature - Intake and' Effluent: Monitoring for intake temperature is retained from the existing permitpursuant to N.J.A.C. 7:14A-13.19. Reporting as a monthly average and daily maximum is required for intaketemperature. Monitoring for intake temperature is required on a year-round (January through December)continuous basis.

A daily maximum effluent limitation of 97.1 degrees Fahrenheit (36.2. degrees Celsius) for effluent temperatureis retained from the existing permit in accordance with N.J.A.C. 7:14A-13.19. Reporting as a monthly average isalso required for effluent temperature. Monitoring for effluent temperature is required on a year-round (Januarythrough December) continuous basis.

Fact dsw.rtf

Fact SheetPage 10 of 28

NJPDES # : NJ0025411

In the -event of certain meteorological conditions, the permittee may not be able to. attain the effluenttemperature limit of 97.1 degrees so the Department has determined it appropriate that an alternate temperaturelimit shall apply under such meteorological conditions. This is due to the fact that the efficiency of the HopeCreek cooling tower is affected by certain meteorological conditions. Therefore, if these certain meteorologicalconditions occur, the permittee is not required to meet the daily maximum effluent limitation of 97.1 degreesFahrenheit but instead is required to monitor for temperature as well as other information; These meteorologicalconditions and other reporting requirements are as follows:

Given a coincident occurrence of wet bulb temperature that exceeds 760 F and a relative humidity below 60 %during a given day for a period equal to or greater then 60 minutes, the daily maximum temperature limit doesnot apply and monitoring only is required. If these two conditions for wet bulb temperature and relativehumidity occur, as well as an exceedance of the temperature limit of 97.1 degrees Fahrenheit at DSN 461A,the permittee is required to submit a chart with columns for the following data for each hour of that day; (1)Cooling Tower Blowdown flow (gpm); (2) Intake Temp; (3) Blowdown Temp (0F); (4) AT (7F) MBTU/Hour;(6) Dry Bulb Temp (0F); (7) Dew Point Temp (°F); (8) Wet Bulb Temp (°F); and (9) Relative Humidity (%).Dry bulb temperature, dew point, barometric pressure and wind speed and direction are measured at 15-minute intervals at Hope Creek's meteorological Station. Wet bulb temperature and relative humidity arecomputed using measurements of dry bulb temperature and dew point with a numerical algorithm that relatesthe dependence of wet bulb temperature and relative humidity on dew point, dry bulb temperature, andatmospheric pressure. In the event that data are not available from the Hope Creek meteorological Tower,then PSEG may utilize data collected at the Wilmington meteorological Station (Wilmington). The use ofanother alternative source (other than Hope Creek meteorological Tower data or Wilmington meteorogicalStation) must be approved in advance by the NJDEP and duly noted on the DMR. The permitee must retainrecords of the Wilmington data or any other data in its DMR back up file for the term specified by theapplicable provisions of the NJPDES regulations.

This alternate temperature condition was originally included in a modification to the existing permit datedOctober 9,2000 (effective December 1, 2000). This meteorological condition has only occurred one time and forone day on July 5, 1999 where an effluent limit of 36.7 degrees Celsius (98.0 degrees Fahrenheit) was achieved..

4. Heat Rate: A daily maximum effluent limitation for heat rate of 662 MBTU/Hr is retained from the existingpexmit in accordance with N.J.A.C. 7:14A-13.19 for September through May. A daily maximum effluentlimitation for heat rate. of 534 MBTU/Hr is retained from the existing permit in accordance with N.J.A.C. 7:14A-13.19 for June through August. Reporting as a monthly average is also required for heat rate from Septemberthrough May as well as for June through August. Heat Rate shall be calculated on a daily basis as the product ofheat capacity, effluent flow and discharge to intake temperature difference as indicated in Part IV.

5. pH. A daily minimum pH limitation of 6.0 standard units and a daily maximum pH limitation of 9.0 standardunits are retained from the existing permit and are applied in accordance with N.J.A.C. 7:14A-13.19. Monitoringshall be performed on a weekly basis using a grab sample type.

6. Chlorine Produced Oxidants: A monthly average effluent limitation for chlorine produced oxidants (CPO) of 0.2mg/L and a daily maximum effluent limitation of 0.5 mg/L are retained from the existing permit in accordancewith N.J.A.C. 7:14A-13.19. These limitations were originally based on the Effluent Limitation Guidelines for theSteam Electric Category (40 CFR Section 423) for cooling tower blowdown. A narrative condition has beenretained from the existing permit, which states that CPO may not be discharged from any operating unit for morethan two hours in any one day. Monitoring shall be performed on a continuous basis using a meter sample type.

) The Department recognizes that the existing permit requires the permittee to sample "three times per week" witha grab sample type. However, given the amount of discharge volume, the Department has determined it moreappropriate to sample on a continuous basis. To allow the permittee some time to install the necessary continuousmeters, the continuous sample type does not become effective until the effective date of the permit plus one year.

Fact dsw.rtf

Fact SheetPage 11 of 28

NJPDES # NJO025411

'7. Phosphoruý: The existing permit specifies monitoring for phosphorus where this monitoring is conditional on thepermittee using an anti-scalant agent that contains phosphorus. Specifically, this provision allowed for the use ofan agent containing phosphorus if such a treatment chemical was needed to protect the mechanical integrity of thecooling tower system.

There has been no use of phosphorus containing treatment chemicals during the course of this existing permitcycle (April 1, 1997 through March 31, 2002). Because the permittee does not anticipate use of a treatmentchemical that contains phosphorus in the future, the permittee has requested deletion of this conditionalphosphorus condition. The Department does not object to this request and therefore has deleted the phosphorusmonitoring condition. In the event that the permittee wishes to use a treatment chemical containing phosphorus inthe future, the Department shall be notified in accordance with item E. i.e. of Part IV.

Anti-Backsliding . Anti:Degradation: Because the permittee has no intention of using an anti-sealant agentcontaining phosphorus as authorized under the existing permit, deletion of this monitoring condition will notaffect the quantity of phosphorus in the permittee's discharge through DSN 461A nor will it affect the quality ofthe receiving waters with respect to phosphorus. As stated previously, the monitoring requirement for phosphoruswas conditional on the permittee using an anti-scalant agent. This monitoring condition was hever used duringthe course of the existing permit cycle since the permittee has not used an anti-scalant agent containingphosphorus.

8. Total Suspended Solids and Oil and Grease: In the existing February 14, 1997 permit, the Department requiredthe permittee to conduct a total suspended solids (TSS) study. The purpose of this study was to assess thepermittee's -effluent discharge of total suspended solids in order to determine the need for additional restrictionson TSS. This study also required the permittee to collect influent data. This study required the permittee to

N• determine if the cooling tower system was quantitatively changing the volume of total solids from the influent.This study, dated October 22, 1999, concludes that a statistically significant change (namely a mean differencefrom 0 mg/L) in the 24-hour concentration of TSS in the influent and effluent concentrations was not measured.Similarly, a statistically significant change in the average mass rate of TSS in the effluent and influent was notmeasured.

Based on the results of this study, the Department has concluded that effluent limitations for TSS are notwarranted at this time. It should be noted that a New Jersey Surface Water Quality Standard for total suspendedsolids does not exist at this time for saline waters.

The Department did not impose effluent limitations or monitoring for oil and grease in the February 14, 1997permit at DSN 461A. This was based on the nature of the operations involved at the site and the effluent sampleresults which showed that all reported values were less than 1 mg/L at DSN 46 IA. Therefore, the Departmentconcluded in that 1997 permit action that the discharge at DSN 461A has a low potential to exceed the effluentstandards at N.J.A.C. 7:14A- 12.8.

The Department has determined that oil and grease effluent limitations and rnrqitoring requirements continue tobe unnecessary at DSN 461A based on available data and the wastewater characteristics at DSN 461A. However,the Department has included a narrative condition in Part IV stating that the effluent shall not exhibit a visiblesheen at DSN 461A.

Please note that although effluent limitations and monitoring requirements for oil and grease have not beenincluded at DSN 46 1A, effluent limitations for oil and grease have been included at DSN's 462B and 461 C both

) of which are internal monitoring points that discharge to DSN 461A. This is described later in the Fact Sheet.* Considering the nature of the wastewater components that are monitored at DSN's 462B and 461C, effluent

limitations and monitoring requirements for oil and grease are more appropriate at these internal locations.

Fact dsw.rtf

Fact SheetPage 12 of 28

NJPDES # : NJO02541 1

9. Whole Effluent Toxicity (WET): Section 101(a) of the Clean Water Act (CWA) establishes a national policy of\1 restoring and maintaining the chemical, physical and biological integrity of the Nation's waters. In addition,

section 101 (a)(3) of the CWA and the State's Surface Water Quality Standards (SWQS) at N.J.A.C. 7:9B-l.5(a)3state that the discharge of toxic pollutants in toxic amounts is prohibited. Further, 40 CFR 122.44(d) and N.J.A.C.7: 14A-13.6(a) require that where the Department determines using site-specific WET data that a discharge causes,shows a reasonable potential to cause, or contributes to an excursion above the SWQS, the permitting authoritymust establish effluent limits for WET. In order to satisfy the requirements of the CWA, the State's SWQS andthe NJPDES Regulations, the need for a water.quality based effluent limitation (WQBEL)-for WET was evaluatedfor this discharge.

The February 14, 1997 final permit included a requirement to conduct an acute and chronic toxicitycharacterization study for DSN 461A. The test results for this study are as follows:

Type of Test Date Results SpeciesAcute 8/25/98 >100% Mysidopsis bahiaAcute 1/13/99 >100% Mysidopsis bahiaAcute 4/20/99 >100% Mysidopsis bahiaAcute 6/8/99 >100% Mysidopsis bahiaChronic 8/25/98 >100% Mysidopsis bahiaChronic 8/25/98 >100% Sheepshead minnowChronic 12/1/98 >100% Mysidopsis bahiaChronic 12/1/98 >100% Sheepshead minnowChronic 4/20/99 >100% Mysidopsis bahiaChronic 4/20/99 >100% Sheepshead minnowChronic 6/8/99 >100% Mysidopsis bahiaChronic 6/8/99 >100% Sheepshead minnow

In a permit modification dated February 2, 2000, the Department informed the permitee that it had reviewed theresults of the acute and chronic toxicity characterization study and deemed them acceptable.

TheDepartment maintains that acute and chronic whole effluent toxicity requirements are not necessary at DSN461A at this time based on the results of the above referenced data where all results were >100%. Any futurerequirements for whole effluent toxicity would be issued in a permit modification which would be subject topublic comment and notice procedures in -accordance with N.J.A.C. 7:14A-16.4.

Discharge Serial Number 461C

1. Flow: This permit does not include a numerical limitation for flow. Monitoring and reporting conditions for flowas a monthly average and daily maximum are applied pursuant to N.J.A.C. 7:14A-13.13. Monitoring for flow isrequired on a continuous basis using a flow meter.

2. Total Organic Carbon (TOC): The daily maximum effluent limitation of 50 frg/L fur TOC is retained from theexisting permit consistent with N.J.A.C. 7:14A-13.19. Monthly average monitoring is also retained for TOC.TOC shall be monitored on a monthly basis where a composite sample type shall be used.

3. Petroleum Hydrocarbons: The daily maximum effluent limitation of 15 mg/L and the monthly average limitationof 10 mg/L have been retained from the existing permit consistent with N.J.A.C. 7:14A-13.19. These effluentlimitations are also consistent with N.J.A.C. -7:14A-12.8. Petroleum Hydrocarbons shall be monitored on atwice/month basis using a grab sample type.

Factdsw.rtf

Fact SheetPage 13 of 28NJPDES# :NJ0025411

A 4. Total Suspended Solids:- The monthly average effluent limitation of 30 mg/L and the daily maximum effluent'W '• limitation of 100 mg/L have been retained from the existing permit consistent with N.J.A.C. 7: 14A-13.19. TSS

shall be monitored on a monthly basis using a composite sample type.

5. Wastewater Characterization Requirement: Due to the presence of some metals (e.g. copper 191'gg/L; zinc 63.6gg/L; cadmium 0.59 gg/L) in the application data, the Department is requiring a wastewater characterizationrequirement (WCR) for these three metals :at this outfall. In addition, the Department is requiring additionalsampling for ammonia as a WCR requirement given the use of ammonium hydroxide as an additive and given therecently promulgated NJ .surface water quality standard for ammonia for saline waters. A minimum of foursamples are required to be obtained from the effective date of the permit (EDP) until EDP + 1 year on aquarterly basis. A composite sample type shall be utilized. In the event that these compounds are shown to bepresent at levels of concern, the Department reserves its right to reopen the permit to incorporate, additional.monitoring requirements and/or effluent limitations pursuant to N.J.A.C. 7:-14A- 16.4.

Discharge Serial Number 462B

1. Flow: This permit does not include a numerical limitation for flow. Monitoring and reporting conditions for flowas a monthly average and daily maximum are applied pursuant to N.J.A.C. 7:14A- 13.13. Monitoring for flow isrequired'on a continuous basis using a flow meter.

2. 5-day. Biochemical Oxygen Demand (BOD5): The monthly average effluent limitation of 8 kg/day has beenretained from the existing permit consistent with N.J.A.C. 7:14A-13.19. This limitation corresponds to the Firststage oxygen demand (FSOD), DRBC allocation of 9.5 kg/day (21 lbs/day). Weekly average reporting for BOD5has also been imposed. BOD 5 shall be monitored on a monthly basis where a composite sample type shall beused.

The Department has incorporated a monthly average concentration limit for BOD 5 of 30 mg/L and a weeklyaverage limit of 45 mg/L in accordance with N.J.A.C. 7:14A-12.2 (b), the Secondary Treatment Standards.BOD5 concentration limits are routinely applied to sanitary discharges throughout the state and is particularlyappropriate for discharges where the flow volumes fluctuate over time (as is the case with the permittee).

The daily minimum BOD 5 percent removal limitation of 87.5% has been retained from the existing permitconsistent with N.J.A.C. 7:14A-13.19. Monthly average monitoring and reporting has also been required in thisrenewal permit. BOD5 percent removal shall be calculated on a monthly basis.

3. Total Suspended Solids: The monthly average effluent limitation of 30 mg/L and the weekly average limit of 45mg/L have been retained from the existing permit consistent with N.J.A.C. 7:14A-13.19 and N.J.A.C. 7:14A-12.2.Both these limits are consistent with the Secondary Treatment Standards at N.J.A.C. 7:14A-12.2 (e). TSS shall bemonitored on a. monthly basis using a composite sample type.

The daily minimum TSS percent removal limitation of 85% has been, retained from the existing permit consistentwith N.J.A.C. 7:14A- 13.19. and N.J.A.C. 7:14A- 12.2. Monthly average monitoring and reporting has also beenrequired in this renewal permit. TSS percent removal shall be calculated on a monthly basis.

4. Oil and Grease: The daily maximum effluent limitation of 15 mg/L and the monthly average limitation of 10mg/L have been retained from the existing permit consistent with N.J.A.C. 7:14A-13.19. These effluentlimitations are also consistent with N.J.A.C. 7:14A-12.8. Oil and Grease shall be monitored on a monthly basisusing a grab sample type.

- 5. Fecal Coliform: The monthly average effluent limitation of 200 # MPN/100 ml and the weekly average limitationof 400 # MPN/100 ml have been retained from the existing permit consistent with N.J.A.C. 7:14A-13.19. These'

Fact dsw.rtf

Fact SheetPage 14 of 28

NJPDES #: NJ0025411

effluent limitations are also consistent with N.SA.C. 7:14A-12.5. Fecal Coliform shall be monitored on amonthly basis using a grab sample type.

6. Chlorine Produced Oxidants (CPO): Although the permittee chlorinates at DSN 462B, the Department has notimposed a CPO limit at DSN 462B since this is an internal monitoring point. A CPO limit has been imposed atDSN 461A to control the discharge of CPO to the receiving waters.

7. Wastewater Characterization Requirement: Due to the presence of some metals (e.g. chromium 3.0 ýtg/L; copper76.8 ýtg/L; cadmium 0.52 gtg/L; nickel 5.9 tg/L;, zinc 302 ptg/L; and cyanide 14 j4g/L) in the application data,,theDepartment is. requiring a wastewater characterization requirement (WCR) for these metals at this outfall.Specifically, a minimum of four samples are required to be obtained from the effective date of the permit (EDP)until EDP + 1 year on a quarterly basis. A composite sample type shall be utilized. In the event that thesecompounds are shown to be present at levels of concern, the Department reserves its right to reopen the permit toincorporate additional monitoring requirements and/or effluent limitations pursuant to N.J.A.C. 7:14A-16.4.

Discharge Serial Numbers 463A, 464A, 465A

Areas of industrial activity exposed to stormwater include secondary containment for the aboveground storage tanks,construction and excavation dewatering, and drum storage areas. As a result, pH, Total Petroleum Hydrocarbons(TPHG), and Total Organic Carbon (TOC) are pollutants of concern and will be monitored through this permit. Themonitoring requirements were derived from the 1978 EPA Region II Guidance for stormwater runoff from industrialsites, and NJPDES "Oil and Grease Effluent Limitations"(N.J.A.C. 7:14A-12). Semi-annual monitoring for pH,TPHC, and TOC are proposed.

Although DSN's 463A and 465A discharge primarily stormwater and tidal influx waters, the Department has includednarrative conditions at these outfalls to address the emergency discharge of cooling tower blowdown through DSN463A where this water is discharged via DSN's 463A and 465A. These narrative conditions are included in Part IV.

C. Influent Monitoring Requirements:

In order to calculate• percent removals for DSN 462B, influent monitoring is required for TSS and BOD5 inaccordance with N.J.A.C. 7:14A-6.5(b) and -11.2(a) 2 as specified in Part III.

D. Effluent Monitoring Requirements:

Monitoring frequencies and sample types are in accordance with N.J.A.C. 7:14A-14, unless specified otherwise in thepermit. Monitoring frequencies for all parameters are based on N.J.A.C. 7: 14A-14.2(c)1. and are addressed for eachindividual parameter above.

In accordance with N.J.A.C. 7:14A-14.2, the permittee may submit a written request for a modification of the permitto decrease monitoring frequencies for non-limited parameters listed in Part III if site specific conditions indicate theapplicability of such a modification.

E. Recommended Quantitation Levels Policy (RQLs):

The Department developed the RQLs to insure that useful data is provided to the Department in order to characterizethe discharger's effluent. The Department recommends that the permittee achieve detection levels that are at least assensitive as the RQLs found in Part III. The Department has determined that the quantitation levels listed therein can,be reliably and consistently achieved by most state certified laboratories for most of the listed ,pollutants using theappropriate procedures specified in 40 CFR Part 136. FAILURE TO ATTAIN A QUANTITATION LEVEL ASSENSITIVE AS A LISTED RQL IS NOT A VIOLATION OF THE PERMIT, BUT DOES TRIGGER SOME

Fact dsw.rtf

Fact SheetPage 15 of 28

NJPDES # NJ0025411

O ADDITIONAL REPORTING REQUIREMENTS FOR THE PERMITTEE AS SPECIFIED IN PART IV OF THEPERMIT.

For the purposes of the WCR Requirements specified for DSN's 462B and 461C, the RQLs are based on DRBCrequirements. Specifically, the RQLs for zinc, copper, and lead are DRBC requirements and are more sensitive thanthose recognized by the Department since the DRBC has identified three metals that are a problem in the DelawareRiver. The RQLs for copper, lead, and zinc shall be 2 ug/L, 1 ug/L, and 10 ug/1 respectively.

F. Reporting Requirements:

All data requested to be submitted by this permit shall be reported on the Discharge Monitoring Reports (DMRs),Waste Characterization Reports (WCR), and Residual Transfer Reports (RTR) as appropriate 'and submitted to theDepartment as required by N.J.A.C. 7:14A-6.8(a).

G. General conditions:

In accordance with N.J.A.C. 7:14A-2.3 and 6. l(b), specific rules from the New Jersey Administrative Code have beenincorporated either expressly or by reference in Part I and Part II.

H. Operator Classification Number:

The operator classification requirement is no longer included in the permit. To obtain or determine the appropriatelicensed operator classification for the treatment works specified, the permittee shall contact the Bureau ofEngineering South at (609) 984-6840 to determine the appropriate licensed operator classification for the treatment

* ~ works specified.

I. Flow Related Conditions:

All flow related conditions are incorporated into the permit to. implement the Treatment Works Approval Program(N.J.A.C. 7:14A-22), the Capacity Assurance Program (N.J.A.C. 7:14A-22.16), the Sewer Ban Program (N.J.A.C.7:14A-9,2.17), the applicable Water Quality Management Plan (N.J.A.C. 7:15), the Delaware River BasinCommission Requirements (N.J.A.C. 7: 14A-2.3(b)), and the Sludge Quality Assurance Regulations (N.J.A.C. 7:14-4).

This facility is recognized as part of the Lower Delaware Water Quality Management Plan (WQMP) in accordancewith N.J.A.C. 7:14A-15.4(b); however, a specific numerical flow restriction is not included in the WQMP.

J. Residuals/Sludge Conditions:

The Limits and Monitoring Requirements in Part III will be deactivated upon issuance of the permit since thedomestic and industrial residuals generated at this site are currently managed at a Nuclear Regulatory Commission(NRC) licensed or a NRC Agreement State licensed facility. In the event either source of residual is not managed as alow-level radioactive waste or as a hazardous waste, the appropriate Limits and Monitoring Requirements in Part IIIwill be activated. It will be the responsibility of the permittee to notify the Department to 'activate the Limits andMonitoring Requirements.

All treatment works with a discharge regulated under N.J.A.C. 7:114A must have permits that implement applicabletechnical standards for residual's management. Generally, the permit issued to the treatment works generating theresidual will include applicable residual quality monitoring as well as other general conditions required by. N.J.A.C.

/7:14A-6. In addition, the permit may include conditions related to any aspect of residual management developed on acase-by-case basis where the Department determines that such conditions are necessary to protect public health andthe environment.

Fact dsw.rtf

Fact SheetPage 16 of 28

NJPDES # NJ002541 I

)The permit may also include conditions establishing requirements for treatment works that send residual to otherfacilities for final use or disposal. Thus, ALL residual preparers (that is, generators as well as persons who managethe residual) are required to submit basic information concerning their residual use and disposal practices. This basicinformation is submitted by compliance with the Sludge Quality Assurance Regulations (N.J.A.C. 7:14C).

The documents listed below have been used to establish the residual conditions of the Draft Permit:

a. United States Environmental Protection Agency "Standards for the use or disposal of sewage sludge" (40CFR Part 503),

b. "New Jersey Pollutant Discharge Elimination System" (N.J.A.C. 7:14A),c. Technical Manual for Residuals Management, May 1998,

-d. USEPA Part 503 Implementation Guidance, EPA 833-R-95-001, October 1995. This document is acompilation of federal requirements, management practices and EPA recommended permit conditions forsewage sludge use and management practices,

e. USEPA A Plain English Guide to the EPA Part 503 Biosolids Rule, EPA/832/R-93/003, September 1994,f. New Jersey "Statewide Sludge Management Plan", November 1987 andg. New Jersey "Sludge Quality Assurance Regulations" (SQAR), N.J.A.C. 7:14C.

K. Compliance Schedule:

In accordance with N.J.A.C. 7:14A-6.4(a), a schedule of compliance is included in the permit, including interimdeadlines for progress or reports of progress towards compliance with the conditions of this permit.

1. Installation of Continuous Sampler for Chlorine Produced Oxidants at DSN 46 1A:a. During the initial phase, from the effective date of the permit (EDP) through EDP + 1 year the permittee shall

sample CPO three times per week.b. During the final phase, from EDP + I year through EDP + 5 years the permittee shall sample CPO with a

continuous sampler.

L. Other Operating Conditions included in Part IV

PCB'sThe Department has retained the narrative condition in Part IV, which prohibits the discharge of PCB's such asthose which are commonly used for transformer fluid.

This subject permit renewal does not require effluent PCB monitoring as DRBC communicated to the Departmenton May 8, 2002 that it is not necessary for the Department to require any PCB monitoring at this time.

Continuous MonitoringBecause continuous monitoring is required at DSN's 461A, 461C and 462B, the Department has includednarrative guidance as to how the permittee should monitor flow and/or temperature iin the event that those metersare temporarily, unavailable due to maintenance, calibration or inoperability.

Service Water BypassAuthorization, to temporarily redirect service water to DSN 463A, thereby bypassing DSN 46 1A, has been grantedin Part IV. This authorization is only permissible during station maintenance where certain notification conditionsare specified.

Flow Measurements Using Rhodamine DyeAuthorization to perform periodic flow measurement of the cooling tower related systems using Rhodamine WTDye has been specified in Part IV. Certain notification conditions are specified.

Fact dsw.rtf

Fact SheetPage 17 of 28

NJPDES #: NJ0025411

Section 316 Determination

Under Section 316(b), the Department must determine whether the location, design, construction, and capacity of theStation's intake structure reflects the best technology available (BTA) for minimizing adverse environmental impact.Decisions under Section 316(b) concerning BTA for cooling water intake structures require a case-by-easedetermination and should include an evaluation of economic considerations. BTA is intended to mean the besttechnology available commercially at an economically practicable cost and, further, that the c6sts of a technology* must not be wholly disproportionate to the environmental benefit to be gained. In the Matter of Carolina Power andLight Company (Brunswick Steam Electric.Plant), NPDES Permit No. NC0007064 (November 7, 1977)) at 31-32; Inthe Matter of Public Service Co. of New Hampshire (Seabrook Station), Case No. 76-6 (June, 1977) ("SeabrookAdministrator's Decision") at 13; Letter from Cynthia C. Dougherty, Director, Permits Division, USEPA to JohnFields, NJDEP.

As described previously, Hope Creek has a shoreline intake structure which withdraws cooling water from the ServiceWater System. After use in the Service Water System, the cooling water is utilized as makeup water for the closedcycle-cooling system where this system relies on a natural draft cooling tower for evaporative cooling of thecondenser cooling water.

The Hope Creek intake structure is equipped with Ristroph travelling screens and a fish return system. The intakestructure is located parallel to and nearly flush with the shoreline. This location increases tidal flushing of theforebay, and eliminates long intake canals and blind pockets, thus reducing the entrapment potential. The intakestructure is equipped with vertical travelling screens and a fish return system that includes screen panel buckets, a lowpressure fish removal system, a high pressure debris removal system, and troughs to return debris and fish to the river.

The intake flow velocities through the trash racks and travelling screens are approximately 0.1 foot per second and0.39 foot per second, respectively. This reduces the swim speed necessary for a fish to escape the intake's attractiveforces and allow most organisms to. escape impingement.

The volumes of water associated with Hope Creek's closed cycle cooling system are relatively low, approximately103 cubic feet per second (66.8 -million gallons per day) during normal operations. Because of this flow volume thenumber of organisms susceptible to entrainment and impingement is relatively low. Water usage at the Station duringnormal operations accounts for less than 0.02 percent of the tidal flow of the Estuary.

Based on the above, the Department has determined that the location, design, construction, and capacity of HopeCreek's cooling water intake structure continues to reflect BTA. This technology significantly minimizes thepotential mortality of aquatic life typically'associated with cooling water intake structures, namely impingement andentrainment. This minimization of mortality is primarily due to the lesser amount of intake flow of closed-cyclecooling systems as compared to once-through cooling systems. Facilities that utilize closed-cycle cooling arerecognized in EPA's proposed Section 3 16(b) rule for existing facilities (Federal Register Notice, April 9, 2002) ashaving minimized adverse environmental impact.

Variances or Alternatives to Permit Conditions:Not Applicable

Procedure for requesting variances or alternatives to water quality based effluent limitations:Procedures for modifying water quality based effluent limitations are found in the New Jersey Surface Water QualityStandards, N.J.A.C. 7:9B-1.8 and 1.9. If awater quality based effluent limitation has been proposed in this permit

1action, the permittee may request a modification of that limitation in accordance with N.J.A.C. 7:14A- 11.7(a). Thisrequest must be made prior to the close of the public comment period. The information that must be submitted tosupport the request may be obtained from the Division of Watershed Management at (609) 633-7020.

Fact dsw.rtf

Fact SheetPage 18 of 28

NJPDES # : NJ0025411

j1 Description of Procedures for Reaching a Final Decision on the Draft Action:Please refer to the procedures described in the public notice that is part of the draft permit. The public notice for theseactions are published in Today's Sunbeam and in the DEP Bulletin.

Contact InformationIf you have any questions regarding this permit action, please contact Susan Rosenwinkel, Bureau of Point SourcePermitting - Region 2 at (609) 292-4860.

Permit Summary Tables

Permit Summary Table for DSN 461A'NL" indicates that monitoring and reporting is required although no limit has been applied for that parameter.Dashes (--) indicate there is no effluent data, no limitations, or no monitoring for this parameter depending on thecolumn in which it appears.

PARAMETER UNITS AVERAGING WASTEWATER APPLICATION EXISTING FINALPERIOD DATA 1/01 - 2/02 DATA* 9/25/01 LIMITS LIMITS

EFFLUENT Flow MGD Monthly Avg 41.8 46.9 NL NLDaily Max 82.1 96.9 NL NL

Data points 14 1461INTAKE Flow MGD Monthly Avg - - - NL

Daily Max - - - NLNET Total Organic Carbon (TOC) mg/L Monthly Avg -0.714 .0.02 NL NL

Daily Max 2 6.0 20 NLData points 14 48

GROSS Total Organic Carbon (TOC) mg/L Monthly Avg 4.28 - NL NLDaily Max 6.5 - NL NL

Data points 14INTAKE Total Organic Carbon (TOC) mg/L Monthly Avg 3.5 - NL NL

Daily Max 7.3 - NL NLData points 14

INTAKE Temperature 'C (CF) Monthly Avg 12.45 12.9 NL NL(September- May) Daily Max 32.6 28.6 NL NL

Data points 11 1096INTAKE Temperature 'C (CF) Monthly Avg 27.0 25.3 NL NL(June - August) Daily Max 29.4 30.3 NL NL

Data points 3 365EFFLUENT Temperature 'C ('F) Monthly Avg 21.64 22.3 NL NL(September-May) Daily Max 32.6 34.6 36.2 (97.1)** 36.2 (97.1)**

Data points 11 1096EFFLUENT Temperature 'C ('F) Monthly Avg 31.1 31.3 NL NL(June-August) Daily Max 34.8 36.7 36.2 (97.1)** 36.2 (97.1)**

Data points 3 365Heat Rate MBTU/Hour Monthly Avg 209 240.2 NL. NL(September - May) Daily Max 309 500.0 662 662

Data points 11 1461Heat Rate MBTU/Hour Monthly Avg 134 175.8 NL NL(June - August) Daily Max 263 376.0 534 534

Data points 3 1461Chlorine Produced Oxidants mg/L Monthly Avg <0.1 <0.1 0.2 0.2

Daily Max <0.1 0.3 0.5 0.5Data points 14 624

PH, Effluent S.U. Daily Minimum 7.6 6.9 6.0 6.0Daily Max 8.8 8.8 9.0 9.0

Data points 14 . 208Phosphorus mg/L Monthly Avg - 0.27 NL

DailyMax -- 0.27 NLData points I

Acute Toxicity, LC5O*** % Range >100 LC50>100% -Data points '4 5

Chronic Toxicity,'lC25*** % Range . >100 IC25>100% -

Data points 8 5

Fact-dsw.rtf

Fact SheetPage 19 of 28

NJPDES# : NJ0025411

* Footnotes for Permit Summary Table for DSN 461A

* The permittee included one sampling point in its application for metals, volatile organics, acid extractables andbase/neutrals. Only the following parameters were present in detectable quantities: chromium 7.7 gtg/L (intake6.5 jig/L); copper 71.4 -g/L (intake 8.3 gg/L); lead 4.0 gtg/L (intake 2.9 p-g/L); nickel 4.7 g-g/L (intake 4.3 g-g/L);zinc 44.1 p-g/L (intake 38.9 gg/L); bromoform 4.6 jtg/L (intake 34 gig/L); chlorodibromomethane 0.15 gg/L(intake 1.8 pgg/L); and di-N-butyl phthalate 0.4 jig/L (intake <4.5 Rg/L).

** In the event of extreme meteorological conditions as specifically defined in Part IV of this-permit, the perinittee isonly required to monitor for effluent temperature and is not required to comply with the effluent temperaturelimit.

*** Acute and chronic characterization studies were required in the February 14, 1997 permit. Based on the receiptof four acceptable acute and chronic whole effluent toxicity tests, the Department issued a permit modification-dated February 22, 2000 to eliminate acute and chronic whole effluent toxicity testing.

Permit Summary Table for DSN 461C

"N'L" indicates that monitoring and reporting is required although no limit has been applied for that parameter.Dashes (--) indicate there is no effluent data, no limitations, or no monitoring for this parameter depending on thecolumn in which it appears.

-PARAMETER UNITS AVERAGING WASTEWATER APPLICATION. EXISTING FINALPERIOD DATA DATA* LIMITS LIMITS

1/01-2/02 9/25/01Effluent Flow MGD Monthly Avg 0.039 0.04 M NL NL

Daily Max. 0.130 0.27 NL NLData points 14 1461

Total Suspended Solids. mg/L Monthly Avg 9.16 <1.0 10 10Daily Max 57 8.0 15 15Data points 14 96 '

Petroleum Hydrocarbons mg/L Monthly Avg 1.87 10.1 NL NLDaily Max 4 26.0 50 50# detected 3 48

# non-detect 11Total Orgfanic Carbon (TOC) mg/L Monthly Avg 5.64 6.5 30. 30

Daily Max 11 22.0 100 100Data points 14 48

The permittee included one sampling point in its application for metals, volatile organics, acid extractables and

base/neutrals. Only the following parameters were present in detectable quantities: copper 191 jig/L; zinc 63.6jig/L; cadmium 0.59 gtg/L; bromoform 0.4 ptg/L; chloroform 1.0 MIgL; and diethyl phthalate 4.4 ptg/L.

0

Fact dsw.rtf

Fact SheetPage 20 of 28

NJPDES #: NJ0025411

Permit Summary Table for DSN 462B

PARAMETER UNITS AVERAGING WASTEWATER APPLICATION EXISTING FINALPERIOD DATA DATA* "LIMITS LIMITS

1/01 -2/02 9/25/01Effluent Flow MGD Monthly Avg 0.010 0.02 NL" NL

Daily Max 0.030 0.07 NL NLData Points 14 1.461

BOD5 Kg/day Monthly Avg 0.2857 12.6 8 8Weekly Avg - - - NLDaily Max 1 35.0 NL-Data Points 14 16

BODs mg/L Monthly Avg ..-- 30Weekly Avg .... 45Daily Max -_-_-___

BOD5- Percent Removal % Daily Monthly Avg 96.3 - - NLMinimum 88.4 - 87.5 87.5

Data Points 14Total Suspended Solids mg/L Monthly Avg 11.6 18.2 30 30

Daily Max 19 60.0 -Weekly Avg 11.6 - 45 45Data Points 14 48

TSS- Percent Removal % Monthly Avg 96.95 - - NLMinimum 93.3 - 85 85

Data Points 14Fecal Coliform MPN/100 ml Monthly Avg 3.75 4.2 200 200

Weekly Avg. 6 99.0 400 400# detected 4 48

# non-detect 10Oil and Grease mg/L Monthly Avg 2.5 1.4 10 . 10

Daily Max 7 7.0 15 15# detected 6 48

# non-detect 8

• The permittee included one sampling point in its application for metals, volatile organics, acid extractables andbase/neutrals. Only the following parameters were present in detectable quantities: chromium 3.0 ýLg/L; copper.76.8 •tgiL; cadmium 0.52 gg/L; nickel 5.9 ptg/L; zinc 302 ptg/L; cyanide 14 gtg/L; chloroform 2.8 gg/L; toluene 10

tgtL; bis-2-ethylhexyl phthalate 1.3 .tg/L; diethylphthalate 3.4 ug/L; and di-N-butyl phthalate 0.4 4tg/L.

Fact.dsw.rtf

Fact SheetPage 21 of 28

NJPDES #: NJ0025411

0 CONTENTS OF THE ADMINISTRATIVE RECORD

The following items are used to establish the basis of the Draft Permit:

1. 33 U.S.C. 1251 et seq., Federal Water Pollution Control Act:2. N.J.S.A. 58:1OA-1 et seq., New Jersey Water Pollution Control Act.3. 40 CFR Part 122, National Pollutant Discharge Elimination System.4. N.J.A.C. 7:14A-1 et seq., New Jersey Pollutant Discharge Elimination System Regulations. [A]5. N.J.A.C. 7:9B-1 et seq., New Jersey Surface Water Quality Standards. [A]6. 40 -CFR Part 131, Federal Water Quality Standards. [A]7. "Field Sampling Procedures Manual", published by the NJDEP. [A]8. "Discharge Monitoring Report (DMR) Instructional Manual", published by the

NJDEP. [A]9. "EPA Technical Support Document for Water Quality-based Toxics Control", EPAI505/2-90-001, March

1991. [A]10. "Basis and background: Regulation of Toxics in NJDES/DSW Permits," NJDEP, April 15, 1993.11. Delaware River Basin Commission Water Quality Regulations12. NJPDES/DSW Permit Application dated September 25, 200113. NJPDES/DSW Permit NJ002541 1, issued February 14, 1997 and modificationis February 2, 2000 and October

9, 2000.14. Site Visit on May 21, 2002.15. Discharge monitoring reports dated January 2001 through February 2002.16. 40 CFR Part 423, EPA Effluent Limitation Guidelines for the Steam Electronic Power Generating Category.17. DRBC Docket 73-193-CP, revised April 25, 1984.

* 18. Communication dated May 8, 2002 from Patricia McSparran of DRBC to Susan Rosenwinkel and NJDEPstating that PCB monitoring need not be a component of any renewal permit.

19. Correspondence dated October 1, 2001 addressed to NJDEP from G. Salomon of PSE&G to transmit theStormwater Pollution Prevention Inspection and annual update.

20. Submittal dated August 31, 2001 addressed to Carol Collier of the DRBC from Maureen Vaskis of PSE&G.concerning PCB monitoring samples that were collected December 7, 2000, January 25, 2001, and March 21,

.,2001.21. Correspondence dated October 22, 1999 addressed to Debra Hammond of NJDEP from J. Eggers of PSE&G

transmitting the final report for the Cooling Tower Total Suspended Solids study.22. Correspondence dated July 9, 1998 addressed to Administrator of Water Compliance and Enforcement

notifying the Department of an upset condition where an effluent temperature value of 98.0'F was reached onJuly 5, 1999. This correspondence requests an affirmative defense for the violation done to extrememeteorological conditions.

23. Correspondence addressed to David Powell of PSE&G from Richard DeWan dated November 25, 1997approving the cooling tower total suspended solids study work plan.

24. Correspondence addressed to Suzanne Dietrick of PSE&G from David Powell dated October 1, 1997containing a cooling tower suspended solids work plan.

25. Stormwater Pollution Prevention Plan submitted by PSE&G on September30, 1997 and approved by NJDEPon December 4, 1997.

26. 1978 EPA Region II Guidance for stormwater runoff from industrial sites.

[A] Denotes items which may be found in the NJPDES/DSW Administrative Record Library located in theNJDEP Central File Room, 401 East State Street, Trenton, New Jersey.

)

Fact dsw.rtf

w- --.-

NN

\ ~4..// LOWER

A L L O WAYS-C "" " ' :' .,',*", "-. :

CREEEK -'

HOPE CREEK.GENERATING/;

STATION LIM"/

A

* 1~

V

1

IIII

TURBINE BUILDING

I

--- -- '-

I /I //.

- //

N

,N 20DO' 1000* 100(r 200(Y

-4 -4 - - - - 4- - -SCALE: 1" =2000'

i s map complies withnational map accuracy samndards. 1

LEGEND:

A, = PRODUCITION WELL

A = OBSERVATION WELL

pORTION OFTAYLORS BKIDG QUADRANGLE

DELAWARE-MEW JERSEY7-5 XM-MT SERES aX)POGRAPMO

General Site Map

N

S+i

DSN 464 -.4

DSN 461A -.4

DSN 462A.-

4l

DSN 463A

LEGEND

1. HAZARDOUS WASTE TRANSFER AREA2. COOUNG TOWER3. 500KV SWTCHY -YARD4. GUARD HOUSES. TURBINE BUILDING6. REACTOR BUILDING7. AUXILIARY BUILDING8. ADMIN FACILITY AND STOREROOM9. SEWAGE TREATMENT PLANT10. LOW VOLUME & OILY WASTE SYSTEMIt MAIN FUEL OIL TANK12. BARGE SUP13. SERVICE WATER INTAKE14. OUTFALL DSN 46415. OUTFALL DSN 461A16. OUTFALL DSN 462A17. OUTFALL DSN 463A18. PRODUCTION WELL #119- PRODUCTION WELL #2

B~ZZ2 SALEM GEN STATION

CD

CD

ITI,

o o r00

9=

Cooling Tower

Evaporative Losses

0Cooling. !Tower • .

RelativeHumidity Power ,

Heated Circulating Plant

rService Water

Pumps"

Discharge and Temperature

Diagram of the Service Water IntakeFact Sheet

Page 26 of 28NJPDES N : N10025411

30. TON 140

SIATIOM SERVICE WATE R PUMP

I I

HOPE CREEK GENERATING STATIONSERVICE WATER INTAKENJPDES PERMIT NO. NJ0025411SEPTEMBER 2001FIGURE NJPDES-1-ITEM5-Af

1@

CO0

En

0 0S

F:

DELAWARE RIVER

zCi)0

z

0

I-ci)

0z

L <

0 0

ZO0§ R CASCADIN

O0 WEIRD4

DSN462BV

z

wu

Gr_

CHLORINATOR

CHLORINECONTACT TANKS

,, -4 - .-

SLUDGEPUMPED OUT -FOR PROPER DISPOSAL

CD

z

0

co1

'' (A4 a." r

G - FLOW MEASUREMENT

(D- SAMPLE LOCATION WASTE RETURNACTIVATED ACTIVATEDSLUDGE SLUDGE

HOPE CREEK GENERATING STATIONSEWAGE TREATMENT SYSTEMNJPDES PERMIT NO. NJ0025411NJPDES OUTFALL - DSN 482BSEPTEMBER 2001

0

0 Ne J rsey -eateto Eniomna Proecio-ii

NEW JERSEY POLLUTANTDISCHARGE ELIMINATION SYSTEM

The New Jersey Department of Environmental Protection hereby grants you a NJPDES permit for the facility/activity named in this document. Thispermit is the regulatory mechanism used by the Department to help ensure your discharge will not harm the environment. By complying with theterms and conditions specified, you are assuming an important role in protecting New Jersey's valuable water resources. Your acceptance of this permitis an agreement to conform with all of its provisions when constructing, installing, modifying, or operating any facility for the collection, treatment, ordischarge of pollutants to waters of the state..If you have any questions about this document, please feel free to contact the Department representativelisted in the permit cover letter. Your cooperation in helping us protect and safeguard our state's environment is appreciated.

Permit Number: NJ0025411

Draft: Surface Water Renewal Permit Action

Permittee:PSEG NUCLEAR LLCPO BOX 236/N21ALLOWAY CREEK NECK ROADHANCOCKS BRIDGE, NJ, 08038

Property Owner:PSEG NUCLEAR LLC80 PARK PLAZANEWARK, NJ 07101

Co-Permittee:

Location Of Activity:HOPE CREEK GENERATING STATIONARTIFICIAL ISLANDFOOT OF BUTTONWOOD RDLOWER ALLOWAYS CREEK, NJ 08038-0000

I Authorization(s) Covered Under This Approval I Issuance Date I Effective Date I Exviration Date IIB -Industrial Wastewater 1

By Authority of:Commissioner's Office

DEP AUTHORIZATIONPilar Patterson, Chief'--Bureau of Point Source Permitti ng - Region 2.Division of Water Quality I

(Terms, conditions and provisions attached hereto)Mrso ofWte uaiy

O /

dcpsw.rtf

HOPE CREEK GENERATING STATIONLower Alloways Creek

Permit No. NJ0025411Discharge to Surface Water

Surface Water Renewal Permit Action

PART IGENERAL REQUIREMENTS:

NJPDES,

A. General Requirements of all NJPDES Permits

1. Requirements Incorporated by Reference

a. The permittee, shall comply with all conditions set forth in this permit and with all the applicablerequirements incorporated into this permit by reference. The permittee is required to comply withthe regulations, including those cited in paragraphs b. through e. following, which are in effect as ofthe effective date of the final permit.

b. General Conditions

'I)

Penalties for ViolationsIncorporation by ReferenceToxic PollutantsDuty to ComplyDuty to MitigateInspection and EntryEnforcement ActionDuty to ReapplySignatory Requirements for Applications and ReportsEffect of Permit/Other LawsSeverability

* Administrative Continuation of PermitsPermit ActionsReopener ClausePermit Duration and RenewalConsolidation of Permit Process

*; ConfidentialityFee ScheduleTreatment Works ApproVal

c. Operation And Maintenance

Need to Halt or Reduce not a DefenseProper Operation and Maintenance

d. Monitoring And Records

MonitoringRecordkeepingSignatory Requirements for Monitoring Reports

e. Reporting Requirements

* Planned ChangesReporting of Monitoring ResultsNoncompliance Reporting

Hotline/Two Hour & Twenty-four Hour ReportingWritten Reporting

Duty to Provide InformationSchedules of ComplianceTransfer

N.J.A.C. 7:14-8.1 et seg.N.J.A.C. 7:14A-2.3N.J.A.C. 7:14A-6.2(a)4iN.J.A.C. 7:14A-6.2(a)l & 4N.J.A.C. 7:14A-6.2(a)5 & 11N.J.A.C. 7:14A-2.1 1(e)N.J.A.C. 7:14A-2.9N.J.A.C. 7:14A-4.2(e)3N.JA.C. 7:14A-4.9N.J.A.C. 7:14A-6.2(a)6 & 7 & 2.9(c)N.J.A.C. 7:14A-2.2N.J.A.C. 7:14A-2.8N.J.A.C. 7:14A-2.7(c)N.J.A.C. 7:14A-6*2(a)10N.J.A.C. 7:14A-2.7(a) & (b)N.J.A.C. 7:14A-15.5N.J.A.C. 7:14A-18.2 &2.1 l(g)N.J.A.C. 7:14A-3. IN.J.A.C. 7:14A-22 & 23

N.J.A.C. 7:14A-2.9(b)N.J.A.C. 7:14A-6.12

N.J.A.C. 7:14A-6.5N.J.A.C. 7:14A-6.6N.J.A.C. 7:14A-6.9

N.J.A.C. 7:14A-6.7N.J.A.C. 7:14A-6.8N.J.A.C. 7:14A-6.10 & 6.8(h)N.J.A.C. 7:14A-6.10(c) & (d)N.J.A.C. 7:14A-6.10(e) &(f) & 6.8(h)N.J.A.C. 7:14A-2.11, 6.2(a) 14 & 18.1N..A.C. 7:14A-6.4N.J.A.C. 7:14A-6.2(a)8 & 16.2/

GENERAL REQUIREMENTS Page 1 of 1t

HOPE CREEK GENERATING STATION, Lower Adloways Creek Permit No.NJ0025411PER020001 Consolidated Renewal Permit.Actioni

PART H

GENERAL REQUIREMENTS:DISCHARGE CATEGORIES

A. Additional Requirements Incorporated By Reference

1. Requirements for Discharges to Surface Waters

a. In addition to conditions in.Part I of this permit, the conditions in this section are applicable toactivities at the permitted location and are incorporated by reference. The permittee is required tocomply with the regulations which are in effect as of the effective date of the final permit.

i. Surface Water Quality Standards N.J.A.C. 7:9B-1

ii. Water Quality Management Planning Regulations N.J.A.C. 7:15

B. General Conditions

1. Scope

a. The issuance of this permit shall not be considered as a waiver of any applicable federal, state, andlocal rules, regulations and ordinances.

* 2. Permit Renewal Requirement

a. Permit conditions remain in effect and enforceable until and unless the permit is modified,renewed or revoked by the Department.

b., Submit a complete permit renewal application: .180 days before the Expiration Date.

.3. Notification of Non-Compliance

a. The permittee shall notify the Department of all non-compliance when required in accordancewith N.J.A.C. 7:14A-6.10 by contacting the DEP HOTLINE at 1-877-WARNDEP(1-877-927-6337).

b. The permittee shall submit a written report as required by N.J.A.C. 7:14A-6.10 within five days.

4. Notification of Changes,

a. The permittee shall give written notification to the Department of any planned physical oroperational alterations or additions to the permitted facility when the alteration is expected toresult in a significant change in the permittee's discharge and/or residuals use or disposal practicesincluding the cessation of discharge in accordance with N1J.A.C. 7:14A-6.7.

b. Prior to any change in ownership, the current permittee shall comply with the requirements ofN.J.A.C. 7: 14A-16.2, pertaining to the notification of change in ownership.

5. Access to Information

a. The permittee shall allow an authorized representative of the Department, upon the presentation ofcredentials,to enter upon a person's premises, for purposes of inspection, and to access /copy any*records that must be kept under the conditions of this permit.

6. Operator Certification

, General Discharge Requirements Page 1 of 3

HOPE CREEK GENERATING STATION, Lower Alloways Creek Permit No.NJ0025411PER020001 Consolidated Renewal Permit Action

a. Pursuant to N.J.A.C. 7: 1 0A-1.1 et seq. every wastewater system not exempt pursuant to N.J.A.C.7:1 0A-1.10(b) requires a licensed operator. The operator of a system shall meet the Department'srequirements pursuant to N.J.A.C. 7: 1OA-1.1 and any amendments. The name of the proposedoperator, where required shall be submitted to the Department at the address below, in order that.his/her qualifications may be determined prior to initiating operation of the treatment works.

i. Notifcations shall be submitted to:NJDEPExamination and Licensing UnitP.O. Box 417Trenton, New Jersey 08625(609)777-1012

b. The permittee shall.notify the Department of any changes in licensed operator within two weeksof the change.

7. Operation Restrictions

a. The operation of a waste treatment or disposal facility shall at no time create: (a) a discharge,except as authorized by the Department in the manner and location specified in Part III of thispermit; (b) any discharge to the waters of the state or any standing or ponded condtion for wateror waste, except as specifically authorized by a valid NJPDES permit.

8. Residuals Management

a. The permittee shall comply with land-based sludge management criteria and shall conform withthe requirements for the management of residuals and grit and screenings under N.J.A.C.7:14A-6.15(a), which includes:

i. Standards for the Use or Disposal of Residual, N.J.A.C. 7:14A-20;

ii. Section 405 of the Federal Act governing the disposal of sludge from treatment works treating) domestic sewage;

iii. The Solid Waste Management Act, N.J.S.A. 13:IE-I et seq., and the Solid Waste ManagementRules, N.J.A.C. 7:26;

iv. The Sludge Quality Assurance Regulations, N.J.A.C. 7:14C;

v. The Statewide Sludge Management Plan promulgated pursuant to the Water Quality PlanningAct, N.J.S.A. 58:1 1A-1 et seq., and the Solid Waste Management Act, N.J.S.A. 13:IE-1 et seq.;and

vi. The provisions concerning disposal of sewage sludge and septage in sanitary landfills set forth atN.J.S.A. 13:1E-42 and the Statewide Sludge Management Plan.

vii. Residual that is disposed in a municipal solid waste landfill unit shall meet the requirements in40 CFR Part 258 and/or N.J.A.C. 7:26 concerning the quality of residual disposed in a municipalsolid waste landfill unit. (That is, passes the Toxicity Characteristic Leaching Procedure anddoes not contain "free liquids" as defined at N.J.A.C. 7:14A- 1.2.)

b. If any applicable standard for residual use or disposal is promulgated under section 405(d)of theFederal Act and Sections 4 and 6 of the State Act and that standard is more stringent than anylimitation on the pollutant or practice in the permit, the Department may modify or revoke andreissue the permit to conform to the standard for residual use or disposal.

General Discharge Requirements Page 2 of 3

* HOPE CREEK GENERATING STATION, Lower Alloways Creek Permit No.N.J0025411PER020001 Consolidated Renewal Permit Action

c. The permittee'shall make provisions for storage, or some other approved alternative managementstrategy, for anticipated downtimes at a primary residual management alternative. The permitteeshall not be permitted to store residual beyond the capacity of the structural treatment and storagecomponents of the treatment works. N.J.A.C. 7:14A-20.8(a) and N.J.A.C. 7:26 provide for thetemporary storage of residuals for periods not exceeding six months, provided such storage doesnot cause pollutants to enter surface or ground waters of the State. The storage of residual formore than six months is not authorized under this permit. However, this prohibition does notapply to residual that remains on the land for longer than six months when the person whoprepares the residual demonstrates that the land on which the residual remains is not a surfacedisposal site or landfill. The demonstration shall explain why residual must remain on the land forlonger than six months prior to final use or disposal, discuss the approximate time period duringwhich the residual shall be used or disposed and provide documentation of ultimate residualmanagement arrangements. Said demonstration shall be in writing, be kept on file by the personwho prepares residual, and submitted to the Department upon request.

d. The permittee shall comply with the appropriate adopted District Solid Waste or SludgeManagement Plan (which by definition in N.J.A.C. 7:14A-1.2 includes Generator SludgeManagement Plans), unless otherwise specifically exempted by the Department.

e. The preparer must notify and provide information necessary to comply with the N.J.A.C.7:14A-20 land application requirements to the person who applies bulk residual to the land. Thisshall include, but not be limited to, the applicable recordkeeping requirements and certificationstatements of 40 CFR 503.17 as referenced at N.J.A.C 7:14A-20.70).

f. The preparer who provides biosolids to another person who further prepares the biosolids forapplication to the land must proVide this person with notification and information necessary tocomply with the N.J.A.C. 7:14A-20 land application requirements.

g. Any person who prepares bulk residual in New Jersey that is applied to land in a State other thanNew Jersey shall comply with the requirement at N.J.A.C. 7:14A-20.7(b)l.ix and/or 20.7(b)l.x, asapplicable, to provide written notice to the Department and to the permitting authority for theState in which the bulk residual is proposed to be applied.

0General Discharge Requirements Page 3 of 3

HOPE CREEK GENr 'TING STATION, Lower Alloways Creek PermrnPER020001 Consolidated Rene

NJ0025411)rmlt Action

PART IIILIMITS AND MONITORING REQUIREMENTS

A. STORMWATER DISCHARGE

Monitored Location Group Members

463A Stormwater, 464A Stormwater, 465A Stormwater

Consolidated DMR Reporting Requirements:Submit a Semi-Annual DMR: within twenty-five days after the end of every 6 month monitoring period beginning from the effective date of thepermit (EDP).

Table I1J - A r 1: Consolidated DMR Limits and Monitoring Requirements

Limits And 6M g Requirements Page I of 16

0

HOPE CREE @ -TING STATION, Lower Alloways Creek 0 Perm &i1PERO20001 Consolidated Ren t on

B. 461A DSN 461A - DSW

Location Description

Samples shall be collected at a point after combination with all wastewater components and after dechlorination but prior to discharge to the Delaware River. DSN 461A is located atlatitude 39 degrees, 28', 14" and long. 75 degrees 32' 34". DSN 461A discharges to Zone 5 of the Delaware River. The initial period is effective from the effective date of the permit(EDP) to EDP + I year whereas the final period becomes effective on EDP + 1 year. The permittee shall install a continuous sampler for CPO by EDP + 1 year.

Discharge CategoriesIndustrial Wastewater

Surface Water DMIR Reporting Requirements:Submit a Monthly DMR: within twenty-five days after the end of every month beginning from the effective date of the permit (EDP).

Table III - B - 1: Surface Water DMR Limits and Monitoring Requirements

Parameter Sample Limit Statistical Sampling Sample Monitoring - Phase QuantificationPoint Base Frequency Type Period 'Limit

Flow, In Conduit or"- Effluent REPORT Monthly Continuous Metered January thru December FinalThru Treatment Plant Gross Value MGD Average

Flow, In Conduit or Effluent REPORT Daily- Continuous Metered January thru December FinalThru Treatment Plant Gross Value MGD Maximum

Flow, In Conduit or Intake From REPORT Monthly Continuous Metered January thru December FinalThru Treatment Plant Stream MGD AverageFlow, In Conduit or Intake From REPORT Daily Continuous Metered January thru December FinalThru Treatment Plant Stream MGD Maximum

pH Effluent 6.0 Daily 1 / Week . Grab January thru December FinalGross Value SU Minimum

pH Effluent 9.0 Daily 1 / Week Grab January thru December FinalGross Value SU Maximum

Chlorine Produced Effluent 0.2 Monthly Continuous Grab January thru December Final 0.1Oxidants Gross V Yue MG/L . Average Rec Quant LevelChlorine Produced Effluent 0.5 Daily Continuous Grab January thru December Final 0.1Oxidants Gross Value MG/L Maximum Rec Quant LevelTemperature, Effluent .REPORT Monthly Continuous Metered January thru December FinaloC Gross Value DEG.C AverageTemperature,. Effluent 36.2 Daily Continuous Metered. January thru December FinaloC Gross Value DEG.C MaximumTemperature, Intake From REPORT Monthly . Continuous - Metered January thru December FinaloC Stream DEG.C AverageTemperature, Intake From REPORT Daily Continuous Metered January thru December FinaloC Stream DEG.C MaximumCarbon, Tot Organic Effluent Monthly M / Month Grab January thru December Final(TOC) Gross Value REMPGOLRT Average

Limits And Monitoring Requirements Page 2 of 16t...

HOPE CREEK GEN- NTING STATION, Lower Alloways Creek Permi't". NJ0025411PER020001 Consolidated Rene srmit Action

Table 11 - B - 1: Surface Water DMR Limits and Monitoring Requirements

Parameter .. Sample Limit Statistical Sampling Sample Monitoring Phase [ Quantification ]Point Base Frequency Type Period Limit

Carbon, Tot Organic Effluent REPORT Daily 1 / Month Grab January thru December Final(TOC) Gross Value MG/L Maximum

Carbon, Tot Organic Effluent Net REPORT Monthly 1 / Month Calculated January thru December Final(TOC) Value" MG/b Average

Carbon, Tot Organic Effluent Net REPORT Daily 1 / Month Calculated January thru December Final

(TOC) Value MG/L Maximum

Carbon, Tot Organic Intake From REPORT Monthly 1 / Month Grab January thru December Final(TOC) _ _Stream MG/L Average

Carbon, Tot Organic Intake From . REPORT Daily 1/ Month Grab January thru December Final(TOC) Stream MG/L Maximum

Heat (summer) Effluent REPORT Monthly 1 /Day Calculated June thru August Final(per Hr.) Gross Value MBTU/HR Average

Heat (summer) Effluent 534 Daily 1 / Day Calculated June thru August Final(per Hr.) .. Gross Value MBTU/HR - Maximum

Heat (winter) Effluent REPORT Monthly 1/Day Calculated September thru May Final(per Hr.) Gross Value MBTU/HR Average

Heat (winter) • Effluent 662 Daily 1 / Day Calculated September thru May Final(per Hr.) Gross Value MBTU/HR Maximum

Flow, In Conduit or Effluent REPORT Monthly Continuous Metered: January thru December InitialThru Treatment Plant Gross Value MGD Average

Flow, In Conduit or Effluent REPORT - Daily Continuous Metered January thru December InitialThru Treatment Plant Gross Value MGD Maximum

pH Effluent 6.0 Daily I / Week Grab January thru December InitialGross Value SU Minimum

pH .Effluei~t 9.0 Daily 1 / Week Grab January thru December InitialGross Value SU Maximum

Chlorine Produced Effluent " 0.2 Monthly 3 / Week Grab January thru December Initial 0.1Oxidants [Gross Va~ue MG/L Average Rec Quant Level

Chlorine Produced Effluent 0.5 Daily 3 / Week Grab January thru December Initial 0.1Oxidants Gross Value MG/L Maximum Ree Quant Level

Temperature, Effluent REPORT Monthly Continuous Metered January thru December InitialoC Gross Value DEG.C Average

Temperature, Effluent 36.2 Daily Continuous Metered January thru December InitialoC Gross Value DEG.C Maximum

Temperature, Intake From REPORT Monthly Continuous Metered January thru December InitialoC Stream DEG.C Average

Temperature, Intake From REPORT I Daily Continuous Metered January thru December InitialoC Stream DEG.C [ Maximum

Limits And Monitoring Requirements Page 3 of 16

HOPE CRE@".'TING STATION, Lower AlIoways Creek 0 Penr -PER020001 Consolidated Raen Oc~tIon

Table I11 - B - 1: Surface Water DMR Limits and Monitoring Requirements

Parameter Sample Limit Statistical • Sampling Sample Monitoring j Phase Quantification

I Point Base Frequency Type I Period_ Limit

Carbon, Tot Organic Effluent REPORT Monthly 1 / Month Grab January thru December Initial(TOC) Gross Value MG/L Average

Carbon, Tot Organic Effluent REPORT Daily 1/ Month Grab January thru December Initial(TOG) Gross Value MG/L MaximumCarbon, Tot Organic Effluent Net REPORT Monthly I I Month Calculated January thru December Initial(TOC) Value MG/L Average

Carbon, Tot Organic Effluent Net REPORT Daily 1 /Month Calculated January thru December Initial(TOC) Value MG/L Maximum

Carbon, Tot Organic Intake From REPORT Monthly 1 / Month Grab January thru December Initial(TOC) Stream MG/L Average _

Carbon, Tot Organic Intake From REPORT Daily 1 / Month Grab January thru December Initial(TOC) ýStream MG/L Maximum

Heat (summer) Effluent REPORT Monthly 1 /.Day Calculated June thru August Initial(per Hr.) Gross Value MBTU/HR Average

Heat (summer) Effluent 534 Daily I /Day Calculated June thru August Initial(per Hr.) Gross Value MBTU/HR Maximum

Heat (winter) Effluent REPORT Monthly 1 /Day Calculated September thru May Initial(per Hr.) _ Gross Value MBTU/HR Average

Heat (winter) I Effluent 1 662 Daily I / Day Calculated September thru May Initial(per Hr.) Gross Value MBTU/HR_ Maximum

i

Limits And Monitoring Requirements Page 4 of 1a

HOPE CREEK GE1 TING STATION, LowerAlloways Creek Pem NJ0025411PER020001 Consolidated Renm ermit Action

C. 461C DSN 461C - DSW INTERNAL

Location Description

Samples for this internal monitoring point shall be collected after all treatment has been performed and prior to mixing with cooling tower blowdown. This internal discharge pointdischarges through DSN 461A where DSN 461A discharges at latitude 39 degrees, 28', 14" and long. 75 degrees 32' 34".

Discharge Categories

Industrial Wastewater

Surface Water DMR Reporting Requirements:

Submit a Monthly DMR: within twenty-five days after the end of every month beginning from the effective date of the permit (EDP).

Table III - C - 1: Surface Water DMR Limits and Monitoring Requirements

Parameter Sample Limit Statistical Sampling Sample Monitoring P QuantificationPoint Base Frequency Type Period Limit

Flow, In Conduit or Effluent I REPORT Monthly Continuous Metered January thru December FinalThru Treatment Plant Gross Value MGD Average ..

Flow, In Conduit or Effluent REPORT Daily Continuous Metered January thru December FinalThru Treatment Plant Gross Value MGD. Maximum

Solids, Total Effluent 30 Monthly I1 / Month Composite January thru December FinalSuspended Gross Value MG/L *Average

Solids, Total Effluent 100 Daily I /Month Composite January thru December FinalSuspended Gross Value MG/L Maximum

Petrol Hydrocarbons, Effluent 10 Monthly 2 / Month Grab January thru December FinalTotal Recoverable. Gross Value *MG/L Average

Petrol Hydrocarbons, - Effluent 15 Daily " 2 / Month Grab January thru December Final

Total Recoverable Gross Value MG/L Maximum

Carbon, Tot Organic Effluent REPORT Monthly 1 / Month Composite January thru December Final(TOC) Gross Vilue MG/L Average .

Carbon, Tot Organic Effluent 50 Daily I / Month Composite January thru December Final(TOC) Gross Value MGiL Maximum I

:j

Limits And * ng Requirements

.5of 16.i

HOPE CRE*D - NTING STATION, LowerAlloways Creek .0 Perd Re11PER020001 Consolidated Rem 0ction

Surface Water WCR - Quarterly Reporting Requirements:Submit a Quarterly WCR: within twenty-five days after the end of every quarterly monitoring period beginning from the effective date of thepermit (EDP). A minimum of four samples shall be taken during the period beginning with the effective date of the permit (EDP) until EDP + 1year for DSN 461C. After EDP + 1 year, the Wastewater Characterization Requirement is no longer required for DSN 461C.

Table III - C - 2: Surface Water WCR - Quarterly Limits and Monitoring Requirements

Parameter Compliance . Units Sample Monitoring Phase QuantificationQuantity -Type Period Limit

Nitrogen, Ammonia REPORT UG/L 24 Hour Composite January thru December Final 20.Total (as N) Rec Quant Level

Zinc, REPORT UG/L 24 Hour Composite . January thru December Final 10Total Recoverable Ree Quant Level

Cadmium, . REPORT UGiL 24 Hour Composite January thru December Final 4Total Recoverable Red Quant Level

Copper, REPORT UG/L 24 Hour Composite January thru December Final 2Total Recoverable Rev Quant Level

Limits And Monitoring Requirements Page 6 of 16

HOPE CREEK G 'TING STATION, Lower Alloways Creek Perrr NJ0025411PER020001 Consolidated Rent ermit Action

D. 462B DSN 462B - DSWOUTFALL

Location Description

Samples obtained from this internal monitoring point shall be collected after all treatment has been performed and prior to mixing with cooling tower blowdown. This internaldischarge point discharges through DSN 461A where DSN 461A discharges at latitude 39 degrees, 28', 14" and long. 75 degrees 32' 34".

Discharge Categories

Industrial Wastewater

Surface Water DMR Reporting Requirements:

Submit a Monthly DMR: Within twenty-five days after the end of every month beginning from the effective date of the permit (EDP)..

Table III - D - 1: Surface Water DMR Limits and, Monitoring Requirements

Parameter .. Sample ELimit Statistical Sampling Sample Monitoring Phase QuantificationPoint Base Frequency Type Period Limit

Flow, In Conduit or Effluent REPORT Monthly I /Day Metered January thru December FinalThru Treatment Plant Gross Value MGD . Average

Flow, In Conduit or Effluent REPORT Daily I / Day Metered January thru December FinalThru Treatment Plant Gross Value MGD Maximum

BOD, 5-Day (20 oC) Raw REPORT Monthly 1 / Month Composite January thru December FinalSew/influent MG/L Average

BOD, 5-Day (20 oC) Raw REPORT Daily 1 / Month Composite January thru December FinalSew/influent MG/L Maximum

DOD, 5-Day (20 oC) Effluent 8 Monthly 1 / Month Composite January thru December FinalGross Value KG/DAY Average

BOD, 5-Day (20 oC) Effluent REPORT Weekly 1/ Month Composite January thru December FinalGross Value KG/DAY Average

BOD, 5-Day (20 oC) Effluent 30 Monthly 1 /Month Composite January thru December FinalGross Value MG/L Average

BOD, 5-Day (20 oC) -Effluent 45 Weekly I MonthCopst Jaur h DcmeFilGross Value MG/L Average

BOD, 5-Day (20 oC) Percent 87.5 Daily I / Month Calculated January thru December FinalRemoval PERCENT Minimum

BOD, 5-Day (20 oC) Percent REPORT Monthly I / Month Calculated January thru December FinalRemoval PERCENT Average

Solids, Total Raw REPORT Monthly I / Month Composite January thru December FinalSuspended -Sew/influent MG/L Average I

Solids, Total Raw REPORT Daily I / Month Composite January thru December FinalSuspended Sew/influent MG/L Maximum

Solids, Total Effluent 30 Monthly I / Month Composite January thru December FinalSuspended Gross Value MG/L Average

Limits And Monitoring Requirements Page 7 of 16• •0•

J1i;

HOPE CR \TING STATION, LowerAlloways Creek

Table III - D - 1: Surface Water DMR Limits and Monitoring Requirements

Per 5411PER020001 Consolidated Rer, PermitAction2J

Parameter Sample Limit Statistical Sampling Sample Monitoring Phase• QuantificationSolids, Total Effluent 45 Weekly I / Month Composite January thru December FinalSuspended Gross Value MG/L Average

Solids, Total Percent 85 Daily 1 / Month Calculated January thru December FinalSuspended Removal PERCENT Minimum

Solids, Total Percent REPORT- Monthly 1 / Month Calculated January thru December FinalSuspended Removal PERCENT Average

Oil and Grease Effluent' 10 Monthly .1/Month Grab January thru December FinalGross Value MG/L Average

Oil and Grease Effluent 15 Daily 1/ Month Grab January thru December FinalGross Value MG/L Maximum

Coliform, Fecal Effluent - 200 Monthly 1/ Month Grab January thru December FinalGeneral Gross Value #/100ML Geo Avg

Coliform, Fecal Effluent 400 Weekly 1 / Month Grab January thru December' FinalGeneral Gross Value #/100ML' Geometric

Surface Water WCR - Quarterly Reporting Requirements:Submit a Quarterly WCR: within twenty-five days after the end of every quarterly monitoring period beginning from the effective date of thepermit(EDP). A minimum of four samples shall be taken during the period beginning with the effective date of the permit (EDP) until EDP + Iyear for DSN 462B. After EDP + 1 year, the Wastewater Characterization Requirement is no longer required for DSN 462B.

Table III - D 2: SurfaceWater WCR - Quarterly Limits and Monitoring Requirements

Parameter I Compliance Units Sample Monitoring Phase QuantificationQuantity Type Period - Limit

Cyanide, Total REPORT UG/L Grab January thru December Final 40(as CN) ! •1__Rec Quant Level

Nickel, REPORT UG/L 24 Hour Composite January thru December Final 10Total Recoverable ,"Rec Quant Level

Zinc, REPORT UG/L " 24 Hour Composite January thru December Final 10Total Recoverable Rec Quant Level

Cadmium, REPORT UG/L 24 Hour Composite January thru December Final , 4Total Recoverable Rec. Quant Level

Chromium, PREPORT UG/L 24 Hour Composite January thru December Final 10Total Recoverable IRec Quant Level

Copper, . REPORT I UG/L 124 Hour Composite January thru December Final . 2Total Recoverable J_______JRec Quant Level

Tt6

Limits And Monitoring Requirements Page 8

HOPE CREEK GEV' - "TING STATION, LowerAlloways Creek Perrr NJ0025411PER020001 Consolidated Rent ermit Action

E. SI6A OIL/WATER SEPARATOR

Location Description

A representative sample of residuals generated by the Oil/Water Separator shall be analyzed pursuant to the Sludge Quality Assurance Regulations (SQAR, N.J.A.C. 7: 14C).

Discharge CategoriesIndustrial Wastewater

Residuals DMR Reporting Requirements:Submit an Annual DMR: due 60 calendar days after the end of each calendar year.

Table III - E - 1: Residuals DMR Limits and Monitoring Requirements

Parameter I Sample Limit Statistical Sampling Sample Monitoring Phase Quantification_ Point Base Frequency Type Period Limit

Nitrate Nitrogen, Industrial REPORT Monthly 1 / Year Composite January thri December FinalDry Weight Residuals MG/KG Average

Nitrogen, Kjeldahl . Industrial REPORT Monthly 1 / Year Composite January thru December FinalTotal, Dry Wt Residuals MG/KG Average

Styrene Industrial REPORT Monthly I /Year Composite January thru December FinalResiduals MG/KG Average

Nitrogen, Ammonia Industrial REPORT Monthly 1 / Year Composite January thru December FinalDry Weight - Residuals MG/KG AverageSulfide, Total Industrial REPORT Monthly I / Year Composite January thru December Final(as S) Residuals MG/KG Average

Magnesium Industrial REPORT Monthly I / Year Composite January thru December FinalDry Weight Residuals MG/KG Average

Barium, Total Industrial REPORT Monthly I / Year Composite January thru December Final(as Ba) Residuils MG/KG Average

Boron, Total Industrial REPORT Monthly I / Year Composite January thru December Final(as B) Residuals MG/KG Average

Manganese, Total Industrial REPORT.. Monthly I / Year Composite January thru December Final(as Mn) Residuals MG/KG Average

Titanium, Total Industrial REPORT Monthly I / Year Composite January thru December Final(as Ti) Residuals MG/KG Average

Molybdenum . Industrial REPORT Monthly I / Year Composite January thru December FinalDry Weight Residuals MG/KG Average

Phosphorus Industrial REPORT Monthly 1 / Year Composite January thru December FinalDry Weight Residuals MG/KG AverageArsenic, Dry Weight Industrial REPORT Monthly 1I / Year I. Composite January thru December Final

Residuals MG/KG Average I

A i

Limits And Monitoring Requirements Page 9 of 16

0

HOPE CR C,"- "TING STATION, Lower Alloways Creek Per *' 25411PER020001 Consolidated Rent * Action

Table III - E - 1: Residuals DMR Limits and Monitoring Requirements

Paranmeter Sample Limit Statistical quSampling Sample " Monitoringerio. Phase Quantification

Point f. Base Frequency T Type Period Limit_ __

Cobalt, Total Industrial REPORT Monthly I / Year Composite January thru December Final(as Co) Residuals MG/KG Average

Silver, Dry Weight Industrial. REPORT Monthly 1/ Year Composite January thru December FinalResiduals MG/KG Average

Antimony, Dry Weight Industrial -REPORT Monthly 1/ Year Composite January thru December FinalResiduals MG/KG Average

Aluminum, Total Industrial REPORT Monthly 1/Year . Composite January thru December Final(as Al) Residuals MG/KG Average

Selenium, Dry Weight Industrial REPORT Monthly I /Year Composite January thru December FinalResiduals MG/KG. Average

Copper, Dry Weight Industrial I REPORT Monthly. 1 / Year Composite January thru December FinalResiduals . MG/KG Average -

Cadmium, Dry Weight Industrial REPORT Monthly I/ Year Composite January thru December FinalResiduals MG/KG Average

Zinc, Dry Weight Industrial REPORT Monthly I / Year . Composite January thru December FinalResiduals MG/KG Average

Lead, Dry Weight Industrial. REPORT Monthly 1 / Year Composite January thru December FinalResiduals MG/KG . Average ...

Nickel, Dry Weight Industrial REPORT Monthly I / Year Composite January thru December FinalResiduals MG/KG Average

Mercury, Dry Weight Industrial REPORT Monthly I / Year Composite January thru December FinalResiduals MG/KG Average

Chromium, Dry Weight Industrial REPORT Monthly 1 / Year Composite January thru December FinalResiduals MG/KG Average

Iron, Dry Weight -Industrial REPORT Monthly 1/ Year Composite January thru December FinalResiduils MG/KG Average

Benzene, Dry Weight Industrial REPORT. Monthly 1/ Year Composite January thru December FinalResiduals MG/KG Average

Bis(2-chloroethyl) Industrial. REPORT Monthly 1/ Year Composite January thru December Finalether, Dry Wt Residuals MG/KG . Average

Butyl benzyl- I Industrial REPORT Monthly 1/ Year Composite January thru December Finalphthalate, Dry Wt Residuals MG/KG Average

Dimethyl phthalate, Industrial REPORT Monthly 1 / Year Composite January thru December FinalDry Weight Residuals .MG/KG Average

Naphthalene Industrial REPORT Monthly I / Year Composite January thru December FinalDry Weight Residuals MG/KG Average

2-Chloronaphthalene Industrial REPORT Monthly 1/ Year Cm__tJuDry Weight Residuals MG/KG Average

-I'

16Limits And Monitoring Requirements Page 10 of

HOPE CREEK GEl' 'TING STATION, Lower Alloways Creek Perr NJ0025411PER020001 Consolidated Ren, 'ermit Action

Table III - E - 1: Residuals DMR Limits and Monitoring Requirements

Parameter Sample Limit Statistical Sampling Sample Monitoring Phase Quantificationammeter Ba LWsei~n Frequency Type [ Period Limj ua i~t~

Di-n-butyl phthalate Industrial REPORT Montthly I / Year Composite January thru December FinalDry Weight Residuals MG/KG Average

Hexachlorobenzene, Industrial REPORT Monthly I / Year Composite January thru December FinalDry Weight Residuals MG/KG Average

Carbon Tetrachloride Industrial REPORT Monthly 1 / Year Composite January thru December FinalDry Weight Residuals MG/KG Average

Chlorobenzene, Industrial' REPORT Monthly 1 / Year Composite January thru December FinalDry Weight Residuals MG/KG Average

Chloroform Industrial REPORT Monthly 1 / Year Composite January thru December FinalDry Weight Residuals MG/KG Average

Ethylbenzene I Industrial REPORT Monthly 1 / Year Composite January thru December inalDry Weightj Residuals MG/KG Average

Methylene Chloride, Industrial REPORT Monthly 1 / Year Composite January thru December, FinalDry Weight Residuals MG/KG Average ...

Tetrachloroethylene,. Industrial REPORT Monthly I / Year Composite January thru December FinalDry Weight Residuals MG/KG Average

Toluene, Dry Weight Industrial REPORT Monthly 1 / Year Composite January thru December FinalResiduals MG/KG Average

Trichloroethylene, Industrial REPORT Monthly 1 / Year Composite January thru December FinalDry Weight Residuals MG/KG Average

1,1,1-Trichloro- Industrial REPORT Monthly I / Year Composite January thru December Finalethane, Dry Wt Residuals MG/KG Average

Carbon disulfide Industrial REPORT Monthly I / Year Composite January thru December FinalResiduals MG/KG Average

Vinyl acetate Industri alI REPORT Monthly 1 / Year Composite January thru December FinalResidu~ls, MG/KG Average

Xylene Industrial REPORT Monthly I / Year Composite January thru December FinalResiduals MG/KG Average

Acetone Industrial REPORT Monthly 1 / Year Composite January thru December FinalResiduals MG/KG Average

Phenol, Single Industrial REPORT Monthly I / Year Composite January thru December FinalCompound, Dry Wt Residuals MG/KG Average

2,4-D Industrial REPORT Monthly 1 / Year Composite January thru December FinalResiduals MG/KG . Average

Limits And Monitoring Requirements.0 Page 11 of 16

is

HOPE CRE[ T"ING STATION, Lower Alloways Creek 9 Perm" * 5411PER020001 Consolidated Rent W ction

Residuals WCR - Monthly Reporting Requirements:Submit a Monthly WCR: due 60 calendar days after the end of each calendar month.

Table 1II - E - 2: Residuals WCR - Monthly Limits and Monitoring Requirements

Parameter Compliance Units Sample Monitoring Phase QuantificationQuantity Type Period Limit

Sludge Landfilled REPORT • DMT/MO Calculated. January thru December Final

Sludge Land Applied REPORT DMT/MO Calculated January thru December Final

Sludge Disposed REPORT DMT/MO Calculated January thru December FinalOut-of-StateAmt Sludge Rmvd, REPORT WCY/MO Calculated January thru December FinalWet Cubic YardsAmt Sludge Rmvd, REPORT WMT/MO Calculated January thru December FinalWet Metric Tons

Amt Sludge Rmvd, REPORT GAL/MON Calculated January thru December FinalGallonsSludge Bene Use. REPORT DMT/MO Calculated January thru December Final

Out-of-StateSludge Surface REPORT DMT/MO Calculated January thru December FinalDisposedTotal Amount of REPORT DMT/MO Calculated January thru December FinalSludge RemovedSludge Incinerated REPORT DMT/MO jCalculated January thru December Final

Sludge Disposed- REPORT DMT/MO Calculated January thru December FinalOther MethodsSludge/Septage Rcvd REPORT WMT/MO Calculated January.thru December FinalOffsite Srces Wet MT

Sludge/Septage Rcvd REPORT GAL/MON Calculated January thru December FinalOffsite Srces Gals

Sludge/Septage Rcvd REPORT WCY/MO Calculated January thru December FinalOffsite Srces.Wt Yd3Solids, Total REPORT %TS Composite January thru December Final

*1

I-

'II*1*

Limits And Monitoring Requirements Page 12 of 16

HOPE CREEK GEN' " 'TING STATION, Lower Alloways Creek Perrr"PER020001 Consolidated Ren•

NJ0025411ierrnit Action

Residuals Transfer Reporting Requirements-Submit a Monthly RTR: due 60 calendar days after the end of each calendar month.

Limits And Monitoring Requirements

*>Page 13 or 16

0

HOPE CRE * TING STATION, Lower Alloways Creek 0 Pem"*e&41'1PER020001 Consolidated Ren( ctin

F. SLIA STP SYSTEM

Location Description

A representative sample of residuals generated by the STP System shall be analyzed pursuant to the Sludge Quality Assurance Regulations (SQAR, N.j.A.C. 7:14C).

Discharge CategoriesIndustrial Wastewater

Residuals DMR Reporting Requirements:Submit an Annual DMR: due 60 calendar days after the end of each calendar year.

Table III - F - 1: Residuals DMR Limits and Monitoring Requirements

Parameter Sample Limit I Statistical Sampling Sample Monitoring Phase QuantificationPoint Base Frequency Type Period Limit

Solids, Total Residuals REPORT,' Monthly A / Year Composite January thru December Final_ _ _ _ __ _ _ TS Average . _ _.

Nitrate Nitrogen, Residuals REPORT Monthly I /Year Composite January thru December FinalDry Weight MG/KG Average

Nitrogen, Kjeldahl Residuals REPORT . Monthly 1 / Year Composite January thru December FinalTotal, Dry Wt MG/KG Average

Potassium Residuals REPORT Monthly I /Year Composite January thru December FinalDry Weight 1 MG/KG Average

Nitrogen, Ammonia Residuals REPORT Monthly. 1/Year Composite January thru December FinalDry Weight1 MG/KG Average

Calcium Residuals REPORT Monthly 1 / Year Composite January thru December FinalDry Weight MG/KG Average _

Molybdenum Residuals REPORT Monthly 1 / Year Composite January thru December FinalDry Weight . l "MG/KG Average

Phosphorus Residuals REPORT Monthly I / Year Composite January thru December FinalDry Weight MG/KG Average

Arsenic, Dry Weight Residuals. REPORT Monthly 1 /Year Composite January thru December FinalMG/KG Average

Selenium, Dry Weight Residuals REPORT Monthly . /Year Composite January thru December FinalMG/KG Average

Copper, Dry Weight Residuals REPORT Monthly 1/Year Composite January thru December FinalMG/KG Average

Beryllium Residuals REPORT Monthly 1 /Year Composite January thru December Final

Dry Weight I I MG/KG Average .

Cadmium, Dry Weight Residuals REPORT Monthly 1 /Year Composite January thru December FinalMG/KG Average I

;j

Limits And Monitoring Requirements Page 14 of is

:i• 1

:,1HOPE CREEK GEf TING STATION, Lower Alloways Creek Pern' NJ0025411

PER020001 Consolidated Remn 'ermit Action

Table III - F - 1: Residuals DMR Limits and Monitoring Requirements

Parameter .Sample• Limit Statistical Sampling Sample 1 Monitoring Phase QuantificationPoint Base Frequency Type Period Limit

Zinc, Dry Weight Residuals REPORT Monthly I / Year Composite January thru December [FinalMG/KG Average j

Lead, Dry Weight "Residuals REPORT "Mlonthly I / ' Year Composite January thru December Final --

Nickel, Dry Weight IResiduals REPORT Monthly I1/ Year Composite January thru December Final

MG/KG AverageMercury, Dry Weight Residuals REPORT Monthly 1 I Year Composite January thru December Final

MG/KG Average

Chromium, Dry Weight, Residuals R REPORT ] Monthly I I Year Composite January thru December FinalMG/K.G . Average 1

**1

Limits And M g Requirements

0P ,5 of. 16

HOPE CR *' 'TING STATION, Lower Alloways Creek 0 Perm-- s5illPER020001 Consolidated RenP 0 Action

Residuals WCR - Annual Reporting Requirements:

Submit an Annual WCR: due 60 calendar days after the end of each calendar year.

Table 1H - F - 2: Residuals WCR - Annual Limits and Monitoring Requirements

Parameter Compliance Units Sample Monitoring Phase QuantificationQuantity Type Period Limit

Sludge Landfilled REPORT DMT/YR Calculated January tru December Final

Sludge Land Applied REPORT DMT/YR Calculated January thru December Final

Sludge Disposed REPORT DMT/YR Calculated January thru December FinalOut-of-State

Amt Sludge Rmvd, REPORT WCY/YR Calculated January thru December Final

Wet Cubic Yards

Amt Sludge Rmvd,. REPORT WMT/YR Calculated January thru December Final

Wet Metric Tons

Amt Sludge Rmvd, REPORT GAL/YEAR Calculated January thru December Final

Gallons

Sludge Bene Use REPORT DMT/YR, Calculated January thru December Final

Out-of-State

Sludge Surface REPORT DMT/YR Calculated January thru December Final

Disposed

Total Amount of REPORT DMT/YR Calculated January thru December FinalSludge Removed

Sludge Incinerated REPORT DMT/YR Calculated January thru December Final

Sludge Disposed- REPORT DMT/YR Calculated January thru December Final

Other Methods

Solids, Total REPORT %ATS Composite January thru December Final

Residuals Transfer Reporting Requirements:Submit an Annual RTR: due 60 calendar days after the end of each calendar year.

Limits And Monitoring Requirements Page 16 of 16

HOPE CREEK GENERATING STATION, Lower Alloways Creek Permit No.NJ0025411PER020001 Consolidated Renewal Permit Action

PART IV

SPECIFIC REQUIREMENTS: NARRATIVE

Industrial Wastewater

A. MONITORING REQUIREMENTS

1. Standard Monitoring Requirements

a. Each analysis required by this permit shall be performed by a New Jersey Certified Laboratorythat is certified to perform that analysis.

b. The Permittee shall perform all water/wastewater analyses in accordance with the analytical testprocedures specified in 40 CFR 136 unless other test procedures have been approved by theDepartment in writing or as otherwise specified in the permit.

c. The permittee shall utilize analytical methods that will ensure compliance with the QuantificationLevels (QLs) listed in PART III. If the permittee and/or contract laboratory determines that theQLs achieved for any pollutant(s) generally will not be as sensitive as the QLs specified in PARTIII, the permittee must submit a justification of such to the Bureau of Point Source PermittingRegion 2. Failure to submit ajustification is a permit violation.

d. All sampling shall be conducted in accordance with the Department's Field Sampling ProceduresManual; or an alternate method approved by the Department in writing.

e. All monitoring shall be conducted as specified in Part III.

f. All sample frequencies expressed in Part III are minimum requirements. However, if additionalsamples are taken, analytical results shall be reported as appropriate.

g. The permittee shall perform all residual analyses in accordance with the analytical test proceduresspecified in 40 CFR 503.8 andthe Sludge Quality Assurance Regulations (N.J.A.C. 7:14C) unlessother test procedures have been approved by the Department in writing or as otherwise specifiedin the permit.,

'• h. Flow shall be measured using a flow meter at DSN's 46 IA, 461C and 462B.

i. The net amount of heat per unit time shall be calculated by multiplying heat capacity, dischargeflow, and discharge-intake temperature difference.

j. Net limitation shall be calculated by multiplying [(gross effluent concentration)*(gross effluentflow) - (intake concentration)*(intake flow)}/(gross effluent flow).

B. RECORDKEEPING

1. Standard Recordkeeping Requirements

a. The permittee shall retain records of all monitoring information including all calibration andmaintenance records, all original strip chart recordings for continuous monitoring instrumentation,copies of all reports, and all data used to complete the application for this permit.

b. Records of monitoring information shall include the date, locations and time of sampling ormeasurements, the individual who performed the sampling or measurements, the date the sampleswere collected, the date the samples were analyzed, the individual who performed the analysis, theanalytical method used, and the results.

c. The permittee shall retain copies of all reports required by a NJPDES permit and records of alldata used to complete the application for a NJPDES permit for a period of at least 5 years unlessotherwise required by 40 CFR Part 503.

Industrial Wastewater Page 1 of 12 0

HOPE CREEK GENERATING STATION, Lower Alloways Creek Permit No.NJ002541 1PER020001 Consolidated Renewal PermitAction

d. The permittee shall allow an authorized representative of the Department, upon the presentation ofcredentials, to enter upon a person's premises, for purposes of inspection, and to access / copy anyrecords that must be kept under the conditions of this permit.

C. REPORTING

1. Standard Reporting Requirements

a. The permittee shall submit all required monitoring results to the DEP on the forms provided to thefollowing addresses:.

L. NJDEPDivision of Water QualityBureau of Permit ManagementP.O. Box 029Trenton, New Jersey 08625

ii. DRBCP. 0. Box 7360West Trenton, New Jersey 08628

b. If requested by the Water Compliance and Enforcement Bureau, please send the informationrequested to the following address:

i. Southern Bureau of Water Compliance and EnforcementOne Port Center2 Riverside Drive, Suite 201Camden, NJ 08103.

c. For submittal of paper monitoring report forms:

i. All monitoring reports shall be signed by the highest ranking official having day-to-daymanagerial and operational responsibilities for the discharging facility in accordance withN.J.A.C. 7:14A-6.9.

ii. The highest ranking official may delegate responsibility to sign in accordance with NJAC7:14A-6.9(c).

:* d. Monitoring reports shall be completed in accordance with the current Discharge MonitoringReport Manual and any updates.

e. When quantification levels (QL) and effluent limits are both specified for a given parameter inPart III, and the QL is less stringent than the effluent limit, effluent compliance will be determinedby comparing the reported value against the QL.

f. If monitoring for a parameter is not required for that monitoring period, the permittee is requiredto report "CODE=N" on that Monitoring Report Form.

g. For intermittent discharges, the permittee shall obtain a sample during at least one of the dischargeevents occurring during a monitoring period. Place a checkmark in the "No Discharge thisMonitoring Period" box on the monitoring report submittal form only if thete are no dischargeevents during the entire monitoring period.

D. SUBMITTALS

1. Standard Submittal Requirements -

a. The permittee shall amend the Operation & Maintenance Manual whenever there is a change inthe treatment works design, construction, operations or maintenance which substantially changesthe treatment works operations and maintenance procedures.

E. FACILITY MANAGEMENT

- Industrial Wastewater Page 2 of 12

HOPE CREEK GENERATING STATION, Lower Alloways Creek PER020001 Consolidated Permit No.N.J0025411PERO0001ConolidtedRenewal Permrit Action

1. Discharge Requirements

a. The permittee shall discharge at the location(s) specified in PART III of this permit. -

b. The permittee shall not discharge foam, or cause objectionable deposits, or foaming of thereceiving water.

c. The permittee's discharge shall not produce objectionable color or odor in the receiving stream.

d. The discharge shall not exhibit a visible sheen.

e. The Permittee is authorized to use the following additives:

DSN 461A: sodium hypochlorite (although not in excess of two hours per day), ammoniumbisulfite and sodium hydroxide. Refer to item G.1. for more information concerning chlorineproduced oxidants. There shall be no detectable amount of the 126 priority pollutants containedin chemicals added for cooling tower maintenance in the discharge from DSN 461A.

DSN 461 C: Carbohydrazide, Ammonium Hydroxide, Hydrazine.

All outfalls: If the permitee decides to begin using additional agents or replace the above agents inthe future, the permitee must notify the Department at least 180 days prior to use so that thepermit may be reopened, if necessary, to incorporate any additional limitations deemed necessary.

2. Applicability of Discharge Limitations and Effective Dates

a. This permit includes a schedule for compliance for the -following parameters:An alternate sample type for chlorine produced oxidants at DSN 46 IA. The initial phase limitsare effective from EDP until EDP + 1 year. The final phase will become effective on EDP +1 year

3. Operation, Maintenance and Emergency conditions

a. The permittee shall operate and maintain treatment works and facilities which are installed or usedby the permittee to achieve compliance with the terms and conditions of the permit as specified inthe Operation & Maintenance Manual.

b. The permittee shall develop emergency procedures to ensure effective operation of the treatmentworks under emergency conditions in accordance with NJAC 7:14A-6.12(d).

F. CONDITIONS FOR MODIFICATION

1. Causes for modification

a. Pursuant to N.J.A.C. 7:14A-6.2(a)(10)(iii), the Department may modify or revoke and reissue anypermit to incorporate limitations or requirements to control the discharge of toxic pollutants,including whole effluent, chronic and acute toxicity requirements, chemical specific limitations ortoxicity reduction requirements, as applicable.

b. The Department may incorporate requirements to file monitoring data required by this permitelectronically through a minor modification in accordance with N.J.A.C. 7:14A-16.5(a)1.

c. The permittee may request a minor modification to eliminate the monitoring requirementsassociated with a discharge authorized by this permit when the discharge ceases due to changes atthe facility.

G. Custom Requirement

1. Chlorine Produced Oxidants at DSN 461A:

IIndustrial Wastewater Page 3 of 12

HOPE CREEK GENERATING STATION, Lower Alloways Creek Permit No.NJ0025411PER020001 Consolidated Renewal Permit Action

a. Chlorine produced oxidants may not be discharged from any unit for more then two hours in anyone day and not more than one unit in any plant may discharge chlorine produced oxidants at anyone time. Both these conditions remain in effect unless the permittee can demonstrate to theDepartment that the units in a particular location cannot operate at or below this levelIofchlorination. Any alternate condition would be subject to-a permit modification.- -. .

2. Effluent Temperature at DSN 461A

a. Effluent temperature shall be measured at DSN 46 IA on a continuous basis. The effluenttemperature values measured over the course of a calendar day shall be averaged on a daily basisconsistent with the definition of daily discharge pursuant to N.J.A.C. 7:14A-1.2. These dailydischarge points shall be utilized for the purposes of completing discharge monitoring reports as

* well as for calculation purposes.

3. Discharge of PCB's at all Outfalls

a. There shall be no discharge of polychlorinated biphenyl compounds (PCB's)'.such as those which• are commonlyused for transformer fluid.

4. Continuous Monitoring

a. As indicated in Part III, continuous monitoring is required for certain parameters at DSN's 461A,461 C, and 462B. In the event the continuous monitors are temporarily unavailable due tomaintenance, calibration, or inoperability of the continuous monitor, the permitee may use one ofthe following methods for reporting during such interim-periods:. %-

L. DSN 461A Effluent Temperature- temperature detector located at the dechlorination system, atemporary-continuous temperature monitor, or manual sampling once per twelve hour shift.

ii. DSN 461A Intake Temperature - a temporary continuous temperature monitor, intaketemperature at the adjacent Salem Generating Station, or manual sampling once per twelve hour .shift.

iii. DSN 461A Effluent Flow- an installedfloat meter, manual measurement of the height over theeffluent weir once per shift, or a calculation based on the difference between intake flow andestimated evaporative losses.

iv. DSN 46 IA Intake Flow - calculations based on pump run hours.

v. DSN 461A Effluent CPO - manual sampling once per twelve hour shift.

vi. DSN 461C Effluent Flow- calculations based on lift station pump operating hours or pumpingevents.

vii. DSN 462B Effluent Flow - manual measurement of the height of the effluent over a V-notchedweir.

b. Any results from the alternative monitoring methodologies shall not be reported for periods whenthe primary monitoring device is correctly operating. This authorization to use alternativemonitoring methodologies does not alleviate permittee's obligation to maintain the primarymonitoring instrumentation and devices and to ensure their proper operability and availability tothe maximum extent practicable consistent with the applicable requirements ofN.J.A.C.7:14A-1et. seq.

5. Service Water Bypass

a. To facilitate necessary Station maintenance, the permitee is authorized to temporarily redirectservice water to discharge through DSN 463A, bypassing.DSN 461A. The addition of sodiumhypochlorite (or any other chemical biocide authorized by the Department) shall be terminatedduring the bypass discharge. The following conditions shall be met by the permittee when servicewater is discharged through DSN 463A:.

Industrial Wastewater Page 4 of 12

HOPE CREEK GENERATING STATION, Lower Alloways Creek Permit No.NJ0025411PER020001 Consolidated Renewal Permit Action

i. Provide written notification to the Chief, Bureau of Point Source Permitting-Region 2 and theSouthern 13ureau of Compliance Water Enforcement prior to the bypass discharge. Thisnotification shall include the expected dates of the bypass, confirmation that sodiumhypochlorite addition to the service water will be terminated during the bypass, and a briefdescription of-the.reason-the bypassisnecessary. -

ii. Provide oral notification to the Southern Bureau of Compliance and Water Enforcement at least• 24 hours prior to commencing the bypass discharge.

6. Flow Measurements using Rhodamine WT Dye

.a. The permitee is authorized to perform periodic flow measurement testing of the cooling towerrelated systems using Rhodamine WT Dye as a tracer. This dye will discharge to the DelawareRiver through outfall DSN 461A. The following conditions must be met by thepermittee:.

i. Provide written notification to the Chief, Bureau of Point Source Permitting- Region 2 and theSouthern Bureau of Compliance•Water Enforcement prior to the use of Rhodamine WT dye.This notification shall include the expected dates of the discharge, the expected concentration ofRhodamine WT dye in the effluent, and the anticipated concentration of Rhodamine WT due tobe added.

ii. Provide oral notification to the Southern Bureau of Compliance and Water Enforcement at least24 hours prior to commencing the discharge of Rhodamine WT dye.

iii. Within thirty (30) days of completion of the flow measurement testing, provide writtennotification of completion to the Chief, Bureau of Point Source Permitting-Region 2 and theSouthern Bureau of Compliance and Water Enforcement. This notification shall include theactual dates of the discharge, the actual concentration of Rhodamine WT dye in the effluent atDSN 461 A, and the total quantity of Rhodamine WT dye added.

7. Other Regulatory Requirements

a.. The permittee shall comply with all regulations set forth in N.J.S.A. 26:2D-1 et seq. regardingRadiation Protection. All radioactive wastes shall be collected, removed, and disposed of inaccordance with N.J.S.A. 7:28-11.1 et seq.

b. The permittee is licensed by the U.S. Nuclear Regulatory Commission (USNRC) and responsibleto that agency for compliance with radiological effluent limitations, monitoring requirements,' andother licensing conditions.

8. Section 316 Determination Upon Permit Issuance

a. With respect to Section 316 (b), the Department will make a determination at the time of permitrenewal which will include, but will not be limited to, an evaluation of whether technologies, theircosts and benefits, and potential for application at the Station have changed.

9. Compliance with DRBC Requirements

a. The permittee shall discharge so as not to violate the Delaware River Basin Commission WaterQuality Regulations as amended for Zone 5 waters. This includes the stream quality objectivesfor radioactivity namely: alpha emitters - maximum 3 pc/L (picocuries per liter) and beta emitters- maximum 1000 pc/L.

b. The permittee shall ensure that any thermal discharge complies with the termperature and heatdissipation requirements imposed in any current DRBC docket.

10. Alternate Temperature Condition

Industrial Wastewater Page 5 of 12

HOPE CREEK GENERATING STATION, Lower Alloways Creek. Permit No.NJO025411PER020001 Consolidated Renewal Permit Action

a. Given a coincident occurrence of a wet bulb temperature that exceeds 76 degrees Fahrenheit and arelative humidity below 60 percent during a given day for a period equal to or greater than 60minutes, the daily maximum temperature limit does not apply and monitoring only is required. Ifthese two conditions for wet bulb temperature and relative humidity occur, as well as anexceedance of the temperature limit of 97.1 degrees Fahrenheit at DSN 461A, the permittee isrequired to submit a chart with columns for the following data for each hour of that day: (1)Cooling Tower Blowdown Flow (gpm); (2) Intake Temperature (degrees Fahrenheit); (3)Blowdown Temperature (degrees Fahrenheit); (4) Change in Temperature (degrees Fahrenheit);.(5) MBTU/Hour; (6) Dry Bulb Temperature (degrees Fahrenheit); (7) Dew Point Temperature

• (degrees Fahrenheit); (8) Wet Bulb. Temperature (degrees Fahrenheit); and (9) Relative Humidity(percent).

b. Dry bulb temperature, dew point, barometric pressure and wind speed and direction are measuredat 15-minute intervals at Hope Creek's meteorological Station. Wet bulb temperature and relative.humidity are computed using measurements of dry-bulb temperature and dew point with anumerical algorithm that relates the dependence of wet bulb temperature and relative humidity ondew point, dry bulb temperature, and atmospheric pressure. In the event that data are notavailable from the Hope Creek meteorological Tower, then PSEG may utilize, data collected at theWilmington meteorological Station.(Wilmington). The use of another alternative source (otherthan Hope Creek meteorological Tower data or Wilmington metorological Station) must beapproved in advance by the Department and duly noted on the monitoring report form. Thepermittee must retain records of the Wilmington data or any other data in its monitoring reportform back up file for the term specified by the applicable provisions of the NJPDES regulations.

11. Proper Operation, and Maintenance of Cooling Tower

a. The Department reserves the right to revoke the alternate temperaturecondition at DSN 46 IA,which is conditional on the occurence of extreme meteorological conditions, if it is determinedthat the cooling tower is not being properly operated and maintained.

0 Industrial Wastewater Page 6of 12

HOPE CREEK GENERATING STATION, Lower Alloways Creek Permit No.N.J0025411PER020001 Consolidated Renewal Permit Action

Stormwater

A. Monitoring

1. Monitoring Schedule

a. The permittee shall monitor its stormwater discharge in accordance with the monitoringrequirements contained in Part III of the permit.

i. For example, if monitoring is required to be semi-annually, this means every 6 monthsbeginning with the effective date of permit (EDP). Monitoring Report Forms are due by the25th day of the month, immediately. following the semi-annual monitoring period. For example,if a monitoring period is January to June and the EDP is January 1st, then the monitoring shalloccur between January 1st and June 30th with the DMRs submitted to the Department by nolater than July 25th.

2. Criteria for a Valid Storm Event

a. The permittee shall only monitor its stormwater discharge during a valid storm event.

i. The criteria for a valid storm event during which a sample shall be collected is any storm eventthat produces a stormwater discharge during normal working hours and which has not beenpreceded by another storm event within the last 72 hours.

ii. If the permittee controls the discharge of its stormwater by the use of a sump pump, valve, orother means and does not discharge during a precipitation event, then the facility shall monitorits stormwater discharge at the time of the discharge.

3. Monitoring Locations

a. Samples taken in compliance with the specified monitoring requirements contained in Part IIIshall be taken at the following locations: DSN463A; DSN464A; DSN465A.

i. All samples shall be taken at the monitoring points specified above, and in all cases be beforethe effluent joins or is diluted by any other wastestream, body of water or substance.

ii. Sampling points shall not be changed without notification to and the approval of theDepartment.

B. . Reporting

1. Stormwater Monitoring Report Forms

a: Sampling results shall be summarized and reported in accordance with the requirements containedin Part III of this permit on the appropriate monitoring report forms mailed separately by theBureau of Permit Management.

i. If the permittee finds that the pre-printed monitoring report forms they receive from theDepartment contain errors or discrepancies from the monitoring and reporting requirementscontained in Part III, the permittee should immediately contact their case manager at the Bureauof Nonpoint Pollution Control at (609) 633-7021.

ii. The permittee is required to monitor its stormwater discharge and submit appropriate monitoringreport forms to the Department in accordance with-the conditions of the permit even if thepre-printed monitoring report forms contain errors.

iii. The permittee shall make hand corrections to the monitoring report fofrns ifcorrected forms arenot received prior to the monitoring report due date.

2. Reporting "No Discharge"

a. If a discharge does not occur during a particular reporting period, the permittee should check "NoDischarge this monitoring period" on the monitoring form transmittal sheet for each dischargemonitoring location which had "no discharge".

Stormwater Page 7 of 12

HOPE CREEK GENERATING STATION, Lower Alloways Creek Permit No.NJ0025411PER020001 Consolidated Renewal Permit Action

3. Mailing Monitoring Report Forms

a. Unless otherwise specified or directed, signed copies of required monitoring report forms shall besubmitted postmarked no later than the 25th day of the calendar month following the completedmonitoring period to the address given below:

i. New Jersey Department of Environmental ProtectionBureau of Permits ManagementP.O. Box 029Trenton, New Jersey 08625-0029.Attn. Monitoring Reports

4. Annual Reports and Recertifications

a. The permittee shall prepare an annual report summarizing the findings of the annual inspectionperformed in accordance with the "Operations and Maintenance" section of Part IV of the permit.This annual report shall include:

i. the date of inspection;

ii. name(s) and title(s) of the inspectors; and

iii. shall be accompanied by an annual certification (Attachment 3) that the facility is in compliancewith its SPPP and this permit.

iv. If there are any incidents of non-compliance, those incidents shall be identified in thecertification and the steps being taken or taken to remedy the non-compliance, and to preventsuch incidents from recurring.

b. The annual report and recertification shall be submitted annually after SPPP implementation inaccordance with the requirements contained in the "Submittal" section of Part IV of the permit.

5. Reporting Storm Event Information

a. In order for the Department to better assess the monitoring results provided by the permittee, theDepartment requires that supplemental storm event information is recorded and reported alongwith monitoring results.

'S b. The permittee shall record and submit on Wastewater Characterization Report forms provided bythe Department, the following storm event information:

i. date and approximate time that the storm event began;.

ii. an estimate of the inches of rainfall or snowfall, which can be based upon such data as recordedby a local weather monitoring station(s) or an on site maintained monitoring station;

iii. storm event duration in hours and/or minutes, asappropriate;

iv. a statement that there has not been a storm event which caused a stormwater discharge in the last72 hours; and

v. date and time that grab sample was collected.

C. Record Keeping

1. Record Keeping Requirements

a. The permittee shall retain records of all monitoring information, maintenance records, and copiesof all reports required by this permit for a period of at least five years.

2. SPPP Record Keeping Requirements

Stormwater Page 8 of 12Strwte ae f1

HOPE CREEK GENERATING STATION, Lower Alloways Creek Permit No.NJ0025411PER020001 Consolidated Renewal Permit Action

a. The SPPP shall be signed by the permittee, and the original shall be retained at the facility for useand inspection by the Department.

b. The SPPP must be made available, upon request, to a representative of the Department and to theowner and operator of any municipal separate storm sewer receiving the stormwater discharge.

c. The SPPP shall be made available to the public upon request.

d. The facility may claim any portion of the SPPP as confidential in accordance with the provisions

set forth in N.J.A.C. 7:14A- 18.2.

3. Soil Erosion and Sediment Control Plan Record Keeping

a. If the permittee is. required to implement a Soil Erosion and Sediment Control Plan as a result ofconstruction activities or land disturbance greater than 5 acres, a copy of the plan shall be retainedby the permittee for a period of at least 5:"years after the completion of construction.

D. Submittals1. SPPP Preparation Certification (Attachment 2) and SPPP Implementation Certification

(Attachment 3) Submittal Requirements

a. A Stormwater Pollution Prevention Plan (SPPP) shall be prepared and certified in accordance withthe SPPP Preparation Certification (Attachment 2), and implemented and certified in accordancewith the SPPP Preparation Certification (Attachment 3). The SPPP Preparation Certification andthe SPPP Implementation Certification shall be submitted to the Department in accordance withthe submittal schedule below:

i. Submit an SPPP Preparation Certificate: within 6 months from the effective date of thisdocument. This certification is Attachment 2

ii. Submit an SPPP Implementation and Inspection Certification: within 18 months from theeffective date of this document. This certification is Attachment 3

2. Annual Recertification (Attachment 3) Submittal Requirement

a. The permittee shall prepare and submit an annual report and annual certification (Attachment 3) tothe Department as required in the "Reporting" section of Part IV of the permit, which certifies thatthe facility is in compliance with its SPPP and this permit. The annual certification shall besubmitted to the Department in accordance with the submittal schedule below:i. Submit an SPPP Implementation and Inspection Recertification: annually, beginning thirty

months from the effective date of this document. This certification is Attachment 3.

E. Operations and Maintenance

1. Facility and BMP Operation and Maintenance

a. The permittee shall be responsible for supervising and managing the operation and maintenance ofthis facility and any BMPs which are installed or used by the permittee to achieve compliancewith the conditions of this permit and with the requirements identified in the Stormwater PollutionPrevention Plan. Proper operation and maintenance also requires the operation of backup orauxiliary facilities or similar systems when necessary to achieve compliance with the conditions ofthe permit.

2. Annual Inspections

a. Once the SPPP has been implemented inaccordance with this permit, the permittee shall conductannual inspections of the facility to assess all areas contributing to the stormwater dischargeauthorized by this permit, to evaluate whether the SPPP complies with and is implemented inaccordance with this permit, and whether additional measures are needed to meet the conditions ofthis permit. It is this Bureau's judgement that frequent and thorough inspections are necessary toensure adequate functioning of measure controls.

*1Stormwater Page 9 of 12

HOPE CREEK GENERATING STATION, Lower Alloways Creek Permit No.NJ.02541iPER020001 Consolidated Renewal Permit Action

L. Inspections during dry periods allow facilities to identify and address any problems prior to astorm event, thereby minimizing the chance for storm water contamination.

ii. Inspections during significant storm events ensure that measures are functioning as originallyintended and provide an opportunity for facilities to observe what materials and/cr activities areexposed to stormwater.

iii. A summary of any modifications (if any) should be included in the SPPP and submitted to theSouthern Bureau of Water Compliance and Enforcement.

3. Soil Erosion Sediment Control Plan

a. For construction activities disturbing five acres or more of total land area or less than five acreswhich are part of a greater than 5 acre plan of development or sale, authorization'must be obtainedunder either a modification to this permit or under NJPDES Permit No. NJ0088323 (GeneralStormwater Permit Construction Activity), for stormwater from such construction activities thatwould be discharged to surface waters

b. Land disturbances that may result in a stormwater discharge authorized by this permit, shall beexecuted only in accordance with a soil erosion and sediment control plan certified pursuant toN.J.S.A. 4:24-43, or requirements for soil erosion and sediment control established in or pursuantto a municipal ordinance in accordance with N.J.S.A. 4:24-48, whichever is applicable.

c. A copy of this plan shall be retained by the permittee for a period of at least 5 years after thecompletion of construction.

F. Stormwater Pollution Prevention Plan

1. Preparation and Implementation of SPPP

a. A Stormwater Pollution Prevention Plan (SPPP) shall be prepared, certified in accordance with theSPPP Preparation Certification (Attachment 2), and implemented in accordance with the SPPPImplementation and Inspection Recertification (Attachment 3).

i. Deadlines for the preparation and implementation of the SPPP and for the submittal of thecertifications are in the "Submittal" section contained in Part IV of the permit.

2. SPPP Minimum Requirements

a. The SPPP must address all stormwater discharges associated with industrial activity and/or sourcematerials at the facility.

b. Except for the areas where there are Site Specific BMPs which state otherwise (Site SpecificBMPs are listed in the "Site Specific BMPs" section of Part IV of the permit), the SPPP for allother areas, activities, and materials shall demonstrate that upon its implementation, there is either;

i. BMPs are in place preventing exposure (e.g., the materials/activities/areas are inside, or ifoutside, under a cover, or the area is plumbed to discharge to sanitary sewer, or hauled to aPOTW with necessary approvals granted, etc), or

ii. BMPs are in place which reduce or minimize exposure or the effects of exposure of industrialmaterials, machinery, industrial waste products or other source materials to stormwaterdischarging to surface waters (see Attachment 1 - Removal, Cover or Control of IndustrialActivities).

c. The following outside areas/activities/source materials, at a minimum, mdiif be addressed andcontrolled in the SPPP:i. outside vehicle/equipment fueling, maintenance and washing areas, and fuel storage (e.g., diesel

fuel);ii. outside areas used for waste management/handling or storage of equipment (e.g., dumpsters,

scrap metals, vehicle parts, drums, and garbage);

St6nrnwater Page 10 of 12

HOPE CREEK GENERATING STATION, Lower Alloways Creek Permit No.NJ00254"11PER020001 Consolidated Renewal Permit Action

iii. pavement and access roads needing repairs and unpaved surfaces with the potential to erode anddischarge solids (soils and/or sediments) to surface waters;

iv. catch basins, trench drains and roof drains discharging to surface waters;

v. loading docks;

vi. spills/leaks/non-stormwater discharges of fluid products, and raw material, vehicle coolants andlubricants, and caustic and acidic chemicals;

vii. above ground storage tanks containing caustic and acidic chemicals; and

viii. other areas/activities with stormwater:discharges to surface water associated with industrialactivity as defined by the federal rules (40 CFRJ122.26 (b) (14) and contained by reference inthe state rules.

d. The SPPP shall identify existing BMPs and additional BMPs necessary to address the areas andsource materials specified in this section.1. Existing BMPs, if adequate, shall be continued, or replaced with more effective BMPs.

e. The permittee shall demonstrate that upon implementation of the SPPP, it has minimizedexposure, or the effects of exposure, during and after storm events, of source materials located atthe facility to stormwater discharged to surface water.

3. Readily Implementable BMPs

a. Readily implementable BMPs (Spill response, good housekeeping, maintenance; logs andschedules of same) shall be implemented in 30 days of EDP, in accordance with Attachment 1.

4. Engineering Practices

a. The SPPP shall be prepared and implemented in accordance with good engineering practices andshall include, at a minimum, all of the items and information identified in Attachment 1: Contentsof the Stormwater Pollution Prevention Plan.

5. SPPP Signatory Requirements

a. The SPPP shall be signed by the permittee.

b. The original SPPP shall be retained at the facility for use and Department inspection.

c. Copies of the SPPP shall be submitted to the Department's Southern Bureau of Water Complianceand Enforcement and the Department's Central File Room as specified in Attachment 1 and by thedeadline in the "Submittal" section contained in Part IV of the permit.

G. Site Specific Best Management Practices

1. BMP - Discharge of Stormwater from Secondary Containment (version #1)

a. The following BMPs shall be implemented for discharging stormwater from secondarycontainment areas at the facility. This facility is only authorized to discharge stormwater fromthese secondary containment areas in accordance with the following conditions:.

i. the stormwater in the containment area can not have come into contact with the contents of thewastewater storage tank(s);.

ii. the discharge pipe/outfall from the containment area must have a valve and the valve mustremain closed at all times except when discharging stormwater;.

iii. a visual inspection of the tank must be performed on a routine basis to insure the physicalintegrity of the tanks. An inspection log must be maintained regarding this condition;.

Stormwater Page 11 of 12

HOPE CREEK GENERATING STATION, Lower Alloways Creek Permit No. NJ0025411PER020001 Consolidated Renewal Permit Action

iv. regular maintenance of thewastewater tank must be performed (e.g. painting, repair) to insurethe tanks integrity;

v. a visual inspection of the stormwater is to be performed prior to the onset of a discharge toinsure that the stormwater has not been contaminated by the contents of the tank or by othermaterials;

vi. alternative means for disposing the stormwater must be established.for stormwater that has or issuspected to have been contaminated by the contents of the tank or by other materials.

2. BMP - Preventative Maintenance

a. Standard operation procedures shall be established for preventative maintenance.

b. The procedures shall include timely inspections and maintenance of stormwater managementdevices, including, but not limited to:

i. the cleaning of oil/water separators'

ii. the removal of debris from catch basins; and

iii. the inspection, testing and maintenance of facility equipment and systems to uncover conditionsthat could cause breakdowns or failures that may result in the discharges of pollutants to surfacewaters.

3. BMP - Drum Storage

a. Drums that contain source material and are exposed to stormwater at a minimum must be coveredand placed on spill platforms to prevent contact with stormwater. An area graded and/or bermedthat prevents run-through of stormwater may be used, in place of spill platforms.

b. The spill platforms must be regularly maintained.

c. Whenever practicable drums should be stored indoors.

Stormwater Page 12 of 12,

ATTACHMENT 1:CONTENTS OF THE

STORMWATERPOLLUTION PREVENTION PLAN

8. location of existing stormwater structural control measures (e.g., containment, berms,detention/retention basins, grassed swales, oil/water separators); and

9. areas of existing and potential soil erosion.

C. Narrative Description of Existing Conditions

The SPPP shall include anarrative description concerning the existing management of all sourcematerials at the facility which are handled, treated, stored, disposed, or which otherwise exist in amanner allowing contact with stormwater. The narrative description shall address the followingwhere appropriate:

1. any discharges of domestic sewage, non-contact cooling water, or process water that are listedin accordance with A.2 above (unless such discharges have been, authorized by other NJPDESpermits or identified in applications or requests for authorization submitted for other*NJPDESpermits);

2. description of type of industrial activities and/or areas (e.g., fueling, material handling,manufacturing or processing areas) at the site;

3., the actual or potential pollutant categories associated with each industrial area and/or activitywhere source materials are likely to be exposed to stormwater including, but not limited to-fueling stations, loading/unloading areas, maintenance shops, areas where spills and/or leaks ofsource materials frequently occur, equipment or vehicle cleaning areas, outdoor, storage areas,outdoor manufacturing or processing areas, onsite waste disposal areas, above ground liquidstorage tanks, outside storage of raw materials, by-products, or finished products, (e.g., fuelingarea - diesel fuels, gasoline, petroleum hydrocarbons); and

4. a description of existing management practices employed to • a) eliminate contact of sourcematerials with stormwater; b) minimize or reduce pollutants from source materials throughstructural or non-structural measures; c) divert stormwater to specific areas on or off-site,including diversion to containment areas, holding tanks, treatment facilities, or sanitary orcombined sewers; d) treat stormwater discharging from the site; and e) prevent or permit anydischarges of domestic wastewater, non-contact cooling water, or process wastewater to surfacewater.

V. Best Management Practices (BMP) Selection and Plan Design

The permittee shall evaluate the information from the site assessment phase of this plan toidentify potential and existing sources of stormwater contaminated by source material. Alldischarges to surface water of domestic sewage, non-contact cooling water, and processwaste water must be eliminated or permitted. Based upon the site assessment performed, thepermittee shall develop BMP's that will effectively eliminate or reduce pollutant loadings instormwater discharges from the facility in accordance with the following sections. BMPs are

3

measures used to prevent or mitigate pollution from any type of activity. The evaluation andselection of the BMP's addressing each area, and/or activity where source materials are exposedto stormwater discharging to surface water, shall be documented in the SPPP and shall include ata minimum the following BMPs:

A. Non-Stormwater Discharges into Storm Sewers

The facility shall ensure that it does not generate and discharge, through storm sewers to surfacewaters, any domestic sewage, non-contact cooling water, or process wastewaters, unless thatdischarge is authorized by another NJPDES permit or identified in an application or request forauthorization submitted for another NJPDES permit.

B. Removal, Cover or Control of Industrial Activities

Except as specified and required in Part IV of the permit for certain, specific exposures of sourcematerials, all other source materials shall be moved indoors, covered, used, handled, and/orstored in a manner so as to prevent contact with stormwater that is discharged to surface water.Each BMP that prevents such contact shall be identified and discussed in the SPPP.

C. Diverting Stormwater

Approved diversion of contaminated stormwater to either a domestic or industrial wastewatertreatment plant may also be considered when choosing an appropriate BMP where feasible.(Diversion to groundwater may require a separate NJPDES permit. Consult the Bureau ofNonpoint Pollution Control.)

D. Spill Prevention and Response

Areas where actual or potential spills of source materials are exposed to stormwater dischargescan occur, and their accompanying. drainage points shall be identified clearly in the SPPP.Where appropriate, specific material handling procedures, storage requirements and use ofequipment such as diversion valves shall be developed and practiced to prevent and/or eliminatespills and/or leaks of source materials from being exposed to stormwater. Procedures forcleaning up spills shall be specifically included in the plan and made available to the appropriatepersonnel through scheduled employee training. In addition, the facility shall provide orotherwise make available to its personnel the appropriate and necessary-spill cleanup equipmentto effect an immediate and thorough spill cleanup.

E. Good Housekeeping

The SPPP must include a good housekeeping program to help maintain a clean and orderly workplace. For certain activities or areas, the discharge of stormwater exposed to source materials

4

. may be prevented merely by using good housekeeping methods. The following are some simpleprocedures that a facility can consider incorporating into an effective good housekeepingprogram:

1. conduct cleanup immediately after discovery of leaks and spills;

2. implement careful material storage practices;

3. improve operation and maintenance of industrial machinery and processes;

4. maintain up-to-date material inventory;

5. maintain well organized work areas;

6. provide regular pickup and disposal of waste materials;

7. maintain dry and clean floors and ground surfaces by using brooms, shovels, vacuumcleaners, or cleaning machines; and

8. train employees about good housekeeping practices.

F. Preventative Maintenance

The SPPP shall include a Preventative Maintenance Program to. include timely and regularinspections and maintenance of stormwater management devices (e.g., cleaning oil/waterseparators, catch basins, drip pans, catch basins, detention basins, covers, treatment units) androutine inspections of facility equipment and operations to detect faulty equipment. Equipment(such as tanks, piping, containers, and drums) should be checked regularly for signs of.deterioration.

G. Inspections and Evaluation Process

1. Regular Inspections

The SPPP shall require regular inspections of the facility's equipment, exposed source materialsand industrial areas to provide that all elements of the SPPP are in place and working properly.Inspections shall be conducted by qualified, trained plant personnel. Records of theseinspections shall be kept onsite with the SPPP. These inspection records shall consist of the.following, at a minimum: date of inspection; location of and problem(s) identified; steps takento correct problem(s) and prevent recurrence; and inspector's names and title. In addition theseinspection records shall record any incidents such as leaks or accidental discharges, and anyfailures or breakdowns of structural BMPs.

5

2. Annual Inspections

The SPPP shall also require an annual inspection and shall include an annual report of the entirefacility in accordance with Part IV of this permit.

3. Evaluation Process

The SPPP shall include a system to routinely and continually evaluate the SPPP foreffectiveness, any flaws that may have developed, and maintenance that may be required. Theroutine evaluation must include, but not be limited to, regular and annual inspections, inspectionlogs and records, internal reporting, plan revisions to correct any flaws detected in the SPPP or toreflect changes/additions at the facility, and-logs of preventative maintenance performed at thefacility. In addition, the Annual Reports and Certifications required under Part IV are integral tothe evaluation process.

VI. Implementation Schedule

The SPPP shall include an implementation schedule for all structural and non-structural BMP'sincluding a schedule(s) for removal, coverage, minimization of exposure of source material tostormwater, and/or stormwater diversion or: treatment. The schedule shall meet the deadlinesestablished in the permit in accordance with Part IV.

Upon completion of the initial SPPP, those BMP's (e.g., spill response, good housekeeping) thatmay readily be implemented shall be done so within 30 days, if not already practiced.

V11. General Plan Requirements

This section provides additional requirements on the administrative requirements related tofinalizing your SPPP. It covers (1) required signatures, (2) requirements for plan location andaccess, and (3) required certifications.

A. Required Signatures for SPPP and Attachments 2 and 3

The SPPP and Attachments 2 and 3 shall be signed as follows:

FOR A CORPORATION: a "responsible corporate officer" or duly authorized representative. A"responsible corporate officer" is (i) a president, secretary, treasurer, or vice-president of thecorporation in charge of a principal business function, or any other person who performs similarpolicy or decision-making functions for the corporation; or (ii) the manager of one or moremanufacturing, production, or operating facilities employing more than 250 persons or havinggross annual sales or expenditures exceeding $25 million (in second-quarter 1980 dollars), if

6

authority to sign documents has been assigned or delegated to the manager in accordance withcorporate procedures.

FOR A PARTNERSHIP OR SOLE PROPRIETORSHIP: a general partner or the proprietor,respectively, or duly authorized representative.

FOR A MUNICIPALITY, STATE, FEDERAL OR OTHER PUBLIC AGENCY: either aprincipal executive officer or ranking elected official, or duly authorized representative.

A "responsible corporate officer", general partner, proprietor, principal executive officer of apublic agency, or ranking elected official may assign his or her signatory authority for thisCertification to a duly authorized representative, which is a named person or generic position(e.g., plant manager, superintendent, plant engineer, operations manager, etc.) having overall

-responsibility for facility operation or the permittee's environmental matters, by submitting aletter to the Bureau of Nonpoint Pollution Control stating said authority and naming the personor position.

Whenever there are two or more permittees for the facility, all of those permittees shall jointlysubmit this Certification, unless permittees received authorization on different dates and thisCertification is therefore due from them at different dates.

B. Plan Location and Public Access

1. The SPPP and inspection and preventative maintenance records or logs shall be maintained onsite at all times. These documents must be made available, upon request, to a representative ofthe Department and to the owner and operator of any municipal separate storm sewer receiving.the stormwater discharge.

2. The SPPP shall be made available to the public upon request. The facility may claim anyportion of the SPPP as confidential in accordance with the provisions set forth in N.J.A.C.7:14A-18.2.

3. A copy of the SPPP shall be submitted to the appropriate Regional Bureau of WaterCompliance and Enforcement and to the Bureau of Nonpoint Pollution Control. Revisions madeto the facility's SPPP shall be submitted also.

C. Certification of Stormwater Pollution Prevention Plan -

1. Attachment 2 shall be signed and submitted by the permittee to the Department's Bureau ofNonpoint Pollution Control as required by Part IV of the permit.

2. Attachment 3 shall be signed and submitted by the permittee to the Department's Bureau ofNonpoint Pollution Control as required by Part IV of the permit, and annually thereafter inaccordance with the permit.

7

VIII. Special Reauirements

A. Facilities Subject to Emergency Planning and Community Right-to-KnowStatute

For facilities subject to the Emergency Planning and Community Right-to-Know Act (EPCRA)Section 313, the SPPP shall include, or cite the location of, any spill reports prepared under thatAct.

B. Facilities with SPCC Plans, DPCC Plans, or DCR Plans

The SPPP shall include, or cite the location(s) of, any Spill Prevention Control andCountermeasure Plan (SPOC Plan) prepared under 40 CFR 112 and section 311 of the CleanWater Act, 33 U.S.C.§ 1321; and any discharge prevention, containment and countermeasure plan(DPCC plan) and discharge cleanup and removal plan (DCR plan) prepared under N.J.A.C. 7:1E.

C. Facilities Undergoing Construction Activities

Whenever construction activities are undertaken at the facility, the SPPP shall be amended, ifnecessary, so that the SPPP continues to be accurate and to meet the requirements of Part I of thispermit.

8

New. Jersey Department of Env ironmental. ProtectionSBureau of Nonpoint Pollution Control

ATTACHMENT THREEStormwater Pollution Prevention Plan (SPPP)

Initial Implementation and Inspection CertificationIndividual Industrial Stormwater -Permit

SUBMIT THIS FORM ONCE, AFTER SPPP IS IMPLEMENTED. FOR EXISTINGFACILITIES, THE SPPP MUST BE IMPLEMENTED WITHIN 18 MONTHS FROMTHE EFFECTIVE DATE OF THE PERMIT UNLESS THE DEPARTMENT GRANTSAN EXTENSION.

Facility Name:

NJPDES No.

"I certify under penalty of law that this Stormwater Pollution Prevention Plan (SPPP)Implementation and Inspection Certification and all attached documents were prepared under mydirection or supervision in accordance with a system designed to assure that qualified personnel

* properly gather and evaluate this information. Based on my inquiry of the person or persons) who manage the system, or those persons directly responsible for gathering this information, the

information in this Stormwater Pollution Prevention Plan (SPPP) Implementation and InspectionCertification and all attached documents is to the best of my knowledge and belief true,accurate,. and complete.

~. "I certify that the facility has been inspected to identify areas contributing to thestormwater discharge(s) authorized under the permit and to evaluate whether the SPPP preparedcomplies with the permit requirements for stormwater discharge of the permit and is beingproperly implemented.

"I certify that the SPPP referred to in this Stormwater Pollution Prevention PlanImplementation and Inspection Certification has been and will continue to be fully implementedat this facility in accordance with the terms and conditions of the permit. I also specificallycertify that this facility does not generate and discharge, through storm sewers to surface waters,any domestic wastewater, non-contact cooling water, or process waste water (including leachateand contact cooling water) other than stormwater, unless that discharge is authorized by anotherNJPDES permit, identified in an application (or request for authorization) submitted for anotherNJPDES permit or, proof that a determination has been made by the NJDEP that no permit isnecessary.

"I also certify that this facility is not in violation of any condition of the permit forpreparation and implementation of a SPPP, except for any incidents of noncompliance (whichare noted in the attached report). For any incidents of noncompliance identified in the annual

Please attach all reports and plan revisions to this certification and submit it to theBureau of Nonpoint Source Control and submit a copy to the appropriate RegionalBureau of Water Compliance and Enforcement. The original SPPP and a copy ofthis certification are to remain ON SITE available for inspection.

Att3-10/18/O0

" ,,. 7

NON-PSEG.New Jersey Department of Environmental Protection and Energy

Wastewater Facilities Regulation ProgramBureau of Standard Permitting

CN-029Trenton, New Jersey 08625

(609) 292-4860

PUIBLIC NOTICE JUN 2 4 1993

NOTICE OF: CONSIDERATION OF SECTION 316 VARIANCE REQUEST,INTENT TO'RENEW EXISTING NEW JERSEY POLLUTANTDISCHARGE ELIMINATION SYSTEM/DISCHARGE TO SURFACEWATER (NJPDES/DSW) PERMIT NJ0005622, AND NOTICE OFPUBLIC HEARING

Notice is hereby given that the New Jersey Department ofEnvironmental Protection and Energy, .Wastewater FacilitiesRegulation Program proposes to renew the existing NEW JERSEYPOLLUTANT DISCHARGE ELIMINATION SYSTEM/DISCHARGE TO SURFACE WATER(NJPDES/DSW) Permit NJ0005622 to restrict and control the coolingwater intake and the discharge of pollutants, as defined byN.J.A.C. 7:14A-1.9, to the Delaware River, classified as Zone 5,!<,from:

Public Service Electric and Gas CompanySalem Nuclear Generating StationLower Alloways Creek TownshipSalem County, New Jersey

This notice, in accordance with N.J.A.C. 7i14A-8.1 and 7:14A-9.3is being given to inform the public that the NJDEPE has prepareda Draft NJPDES Permit Renewal (NJPDES Permit No. NJ0005622) whichcontains conditions necessary to implement the provisions ofSection 316 of the Clean Water Act and the "RegulationsConcerning The New Jersey Pollutant Discharge Elimination System"(N.J.A.C. 7:14A-1 et seq.), which were promulgated pursuant tothe authority of the New Jersey "Water Pollution Control Act"(N.J.S.A. 58:10A-1 et seq.).

The applicant operates a three-unit electric generating station(SIC number 4911). Units No. 1 and 2 are nuclear-poweredpressurized water reactors each rated at about 1,100 MWe andoperate with a once-through cooling water system. Unit No. 3 isan air-cooled combustion turbine rated at about 4& MWe.

The Department issued a Draft Renewal Permit for this facility on8October 3, 1990. The October 3, 1990 Draft Renewal Permit hasnot yet been finalized. This issuance provides public notice of

*1

Public NoticeNJ0005622Page 2

the Department's intent to reissue a draft permit based on anadministrative record which now includes information and datapresented in comments to the 1990 Draft Permit and thePermittee's 1993 renewal application supplement.

This Draft Permit proposes to authorize the discharge ofpollutants to Zone 5 of the Delaware. This Draft Permit alsoproposes to incorporate the Department's determinations withrespect to the Permittee's request for a variance from surfacewater quality standards for heat and temperature pursuant toSection 316(a) of the Federal Water Pollution Control Act, 33 USCSection 1251 et seq. ("Clean Water Act") and, further, theDepartment's. determination pursuant to Section 316(b) of theClean Water Act regarding the best technology available for thecooling water intake structure for minimizing adverseenvironmental impacts.

The facility has been classified as a.major discharger by the NewJersey Department of Environmental Protection and Energy inaccordance with the United States Environmental ProtectionAgency's (USEPA) rating criteria.

This is an existing facility, and issuance of a NJPDES Permit isthe regulatory mechanism which ensures that discharges ofpollutants are in compliance with applicable standards. TheDraft Permit contains those conditions necessary to restrict thedischarge of pollutants and protect the public health andenvironment.

DSNs 481-486 discharge wastewater composed of once-through non-contact cooling water. Radioactive liquid waste, as permitted bythe United States Nuclear Regulatory Commission ("USNRC"), andnon-radioactive liquid waste mix with the cooling water anddischarge to the River through DSNs 481, 482, 484 and/or 485.Radioactive liquid waste, which averages approximately 0.017 MGD,meets USNRC discharge limitations and conditions. The non-radioactive liquid waste, which averages approximately 0.26 MGD,is treated and monitored at an internal monitoring point, DSN48C, prior to mixing with the cooling water and discharging tothe River through DSNs 481, 482, 4.84 and/or 485. DSN 487Bdischarges approximately 0.002 MGD of wastewater consisting ofstormwater, auxiliary boiler blow down, and systems leakage toDSN 487. DSN 487 also discharges stormwater runoff. DSNs 489Aand 489B both discharge approximately .0.003 MGD of" wastewaterconsisting of stormwater and systems leakage to DSN 489. DSN 489also discharges stormwater runoff.

Public NoticeNJ0005622Page 3

The thermal component of the discharge from DSNs 481-486 issubject to effluent limitations under Section 301 of the CleanWater Act and Section 6 of the New Jersey Water Pollution ControlAct. This Draft Permit proposes to grant the Permittee's thermalvariance request under Section 316(a) and proposes thermaleffluent limitations consistent with the Station's existing once-through cooling water system: maximum effluent temperature43.3 0 C (110 0 F) from October through May and 46.1*C (115*F) fromJune through September; maximum differential temperature 15.3 0 C(27.5 0 F) and total facility-heat of 30,600 MBTU/hr.

The Draft Permit proposes Special Conditions requiring: intakescreen modifications; an intake flow limitation; a wetlandsrestoration, enhancement and preservation program; a fishmigration impediment elimination program; the conduct of sounddeterrent feasibility study; and the conduct of a biologicalmonitoring program. These Special Conditions are required tominimize environmental impacts related to the Station's coolingwater system pursuant to Section 316(b) of the Clean Water Act.

The draft document prepared by the NJDEPE is based on theadministrative record which is on file at the offices of theNJDEPE, located at 401 East State Street, in the City of Trenton,Mercer County, New Jersey. It is available for inspection byappointment, between 8:30 a.m. and 4:00 p.m., Monday throughFriday. Appointments for inspection of the file may be scheduledby submitting a written request to: Ida Marie Englehardt, NJDEPE,Office of Legal Affairs, CN 402, Trenton, NJ 08625-0402. Copiesof the Draft Permit may be obtained for a nominal charge ($0.75for the first ten pages, $0.50 for the second ten pages, and$0.25 for each page thereafter) by contacting the Department.

A copy of the Draft Permit is also available for inspection atthe following locations:

Salem Free Public Library Newark Public Library120 West Broadway 5 Washington StreetSalem, NJ 08079 Newark, NJ 07101-0630

Cumberland County Library NJDEPE Public Access Room800 East Commerce Street 401 East State StreetBridgeton, NJ 08302 Trenton, NJ 08625

Public comment on the Draft Permit will be conducted in twophases as follows:

Public NoticeNJ0005622Page 4

Phase I:

NJDEPE will hold non-adversarial public hearings to solicitpublic comment on the Draft Permit on August 12, 1993 from 2:00p.m. to 5:00 p.m. and 7:00 p.m. to end of testimony at:

Pennsville Memorial High School (Auditorium)111 South BroadwayPennsville, New Jersey

and in Cumberland County on September 9, 1993 from 2:00 p.m. to5:00 p.m. and from 7:00 p.m. to end of testimony at:

Cumberland County Community College (Gymnasium)College RoadVineland, New Jersey

The Permittee/applicant and other interested persons will havethe opportunity to present and submit.information and comment infavor of or in opposition to the proposed terms and conditionsstated in the Draft Permit. The Hearing Officer shall havereasonable discretion in the conduct of the hearing. Among otherthings, the Hearing Officer may set limits upon the time allowedfor oral statements, may require submission of specified

) statements or types of statements to be in writing, and/or mayallow reasonable extension of the comment period by so stating atthe hearing. Unless extended, the Phase I public comment periodin this notice shall close on September 16, 1993.

Interested persons may submit written comments on the draftdocument to the Administrator, Wastewater Facilities RegulationProgram, at the NJDEPE address cited above. All comments must be

* submitted by the close of the Phase I public comment period. Allpersons, including the applicant, who believe that any conditionof this draft document is inappropriate' or that the Department's

* tentative decision to issue this Draft Permit- is inappropriate,must raise all reasonably ascertainable issues and submit allreasonably available arguments and factual grounds supportingtheir position, including all supporting material, by the closeof the Phase I public comment period in accordance with N.J.A.C.7:14A-8.4. All comments submitted by interested persons inresponse to this notice, within the time limit, will beconsidered by the NJDEPE with respect to the Draft Permit.

Phase II:

On September 17, 1993, the comment period will be reopenedpursuant to N.J.A.C. 7:14A-8.5(a) to provide the Permittee or( Nh

\._I

Public NoticeNJ0005622

Page 5

interested persons who submitted comments during Phase I of thecomment period in accordance with N.J.A.C. 7:14A-8.4 anopportunity to comment on the comments, information, or argumentssubmitted by other persons during Phase I. Only comments oncomments, information, or arguments raised during Phase I of thecomment period will be accepted during Phase II.

NJDEPE will hold a non-adversarial roundtable discussion todiscuss comments submitted during Phase I on October 28, 1993from 10:00 a.m. to 1:00 p.m. at:

NJDEPE Public Hearing Room401 East State StreetTrenton, New Jersey 08625

Attendance at the roundtable discussion is open to the public.Participation at the roundtable discussion, however, will belimited to the Permittee and interested persons who submittedcomments during Phase I.

A Department representative shall act as moderator at theroundtable discussion. The moderator shall have reasonablediscretion in the conduct of the roundtable discussions. Amongother things, the moderator may set limits upon the time allowedfor statements, questions, and/or responses, may requiresubmission of specified statements or types of statements to bein writing, and/or may allow reasonable extension of the Phase IIcomment period by so stating, such at the roundtable discussions.Unless extended, the Phase Il comment period in this notice shallclose on November 4, 1993. --

The procedures for reaching a final decision on the Draft Permitare set forth in N.J.S.A. 58:10A-7, N.J.A.C. 7:14A-7.1 et seq.and N.J.A.C. 7:14A-8.1 et seq.

N.J.S.A. 58:10A-7 and N.J.A.C. 7:14A-8.4 provide thatapplicants/permittees/interested parties who believe theDepartment'S tentative decision is inappropriate, must raise' allreasonably ascertainable arguments and factual grounds supportingtheir position on these issues, including all supportingmaterial, by the close of the public comment period. If theapplicant/permittees/interested party fails to raise anyreasonably ascertainable issues at this time, it is deemed tohave waived the right to raise or contest any such issues in anysubsequent adjudicatory hearing or appeal pursuant to N.J.A.C.7:14A-8.9(j) . All supporting materials must be included in fulland may not be incorporated by reference, unless they are alreadypart of the administrative record in the same proceeding, or

Public NoticeNJ0005622Page 6

cons ist of State or Federal statutes and regulations, USEPAdocuments of general applicability, or other generally availablereference materials. After the close of Phase II of the publiccomment period, the Department will issue. or deny the permit.The Department will respond to all significant and timelycomments when a final decision is issued. The applicant and eachperson who has submitted written comments will receive notice ofthe NJDEPE's final decision.

Additional information concerning the Draft Permit may beobtained between the hours of 8:00 a.m. and 4:30 p.m., Mondaythough Friday from Richard Hyjack at (609) 292-4860.

Dennis HartAdministratorWastewater Facilities Regulation Program

N?....

Page . of 152 PagesFact Sheet/BasisNJ0005622

STATE OF NEW JERSEYDEPARTMENT OF ENVIRONMENTAL PROTECTION AND ENERGY

.WASTEWATER FACILITIES REGULATION PROGRAM401 EAST STATE STREET

CN-029TRENTON, NEW JERSEY 08625

FACT SHEETFOR

DRAFT NJPDES PERMIT RENEWALINCLUDING SECTION 316(a) VARI.ANCE DETERMINATION

AND SECTION 316(b) "BTA" DECISION

NJPDES Permit No. NJ0005622

Name and Address of Applicant:

Name and Address.of FacilityWhere Discharge Occurs:

Receiving Water:

Classification:

DATE: JUN 2 4 1993

Public Service Electric andGas Company

80 Park PlazaP. 0. Box 570Newark, New Jersey 07101

Salem Generating StationArtificial IslandLower Alloways Creek TownshipSalem County, New Jersey

Delaware River

Zone 5

A glossary of relevant terms, definitions, and acronyms discussed inthis Draft Permit has been included as Attachment E of the Permit.

Page 2 of 152 PagesFact Sheet/Basis

NJO005622

FACT SHEET

I. INTRODUCTION

The Federal Water Pollution Control Act (the "Clean Water Act" or

"CWA"), 33 U.S.C. 1251 et seq., authorizes federal and state agencies

to regulate discharges of pollutants to surface waters through the

National Pollutant Discharge Elimination System ("NPDES") permit

program. The United States Environrmental Protection Agency

("USEPA"), which originally administered the NPDES program for New

Jersey, delegated program authority to the New Jersey Department of

Environmental Protection and Energy ("NJDEPE" or "Department") in

1982. The NJDEPE implements the NPDES program through the New Jersey

' ) Pollutant Discharge Elimination System (NJPDES) regulations (N.J.A.C.@

7:14A-1 et seg.) which were promulgated pursuant to the authority of

the New Jersey Water Pollution Control Act (N.J.S.A. 58:10A-1 et

seq£.)•

Public Service Electric and Gas Company ("PSE&G" or the "Company" or

"Permittee") is the operator of the Salem Generating Station ("Salem"

or the "Station"). PSE&G shares ownership of the Station with

Philadelphia Electric Company, Delmarva Power and Light Company, and

Atlantic Electric Company. Salem's discharges to surface water are

regulated pursuant to NJPDES permit No. NJ0005622,. first issued to

PSE&G by the USEPA in 1974. Pursuant to the requirements of N.J.A.C.

7:14A-2.1, PSE&G applied in June 1990 for a renewal of the NJPDES

Page 3 of 152 PagesFact Sheet/BasisNJ0005622

i

permit for the Station. In addition to the standard regulatory

requirements for permit renewal, PSE&G's application renewed the

Company's request:for a variance from New Jersey's thermal surface

water quality standards for the Station's once-through cooling water

discharge pursuant to Section 316(a) of the CWA and N.J.S.A. 58:10A-1

et seq. Under Section 316(a), a variance from a thermal standard may

be granted if an alternative limit will "assure the protection and

propagation of a balanced, indigenous population of shellfish, fish,

and wildlife in and on the body of water." At the time PSE&G filed

its permit renewal application, the NJDEPE had under review pursuant

to Section 316(b) of the CWA, a best technology available

demonstration relative to the Station's cooling water intake

structure. Under Section 316(b) of the CWA, the location, design,

construction, and capacity of cooling water intake structures must

reflect the best technology available for minimizing adverse

environmental impact.

In October 1990, the Department issued a draft NJPDES permit ("1990

Draft Permit") denying PSE&G's request for a -variance pursuant to

Section 316(a) and restricting and controlling the operation of the

cooling water intake and the discharge of heat to the Delaware River

through flow and temperature limitations that could only have been

met by retrofitting the Station with a closed cycle cooling system.

The Department's determination was made after a consideration of

PSE&G's 1974 Section 316(a) variance request filed with the USEPA,

-> (as updated in 1975, 1978 and 1979) (hereinafter "Variance Request")

Page 4 of 152 PagesFact Sheet/BasisNJ0005622

and PSE&G's 1984 Section 316(b) Demonstration. In addition to

th'ermal effluent limitations provisions and an intake structure

determination requiring retrofitting the Station with a closed cycle

cooling system, the 1990 Draft Permit contained a number of new or

revised effluent limitations and associated terms and conditions for

other wastewater constituents.

The Department received and considered comments from PSE&G and

numerous other interested parties, including the USEPA, concerning

the 1990 Draft Permit. These comments primarily focused on the

Department's determination concerning PSE&G's Section 316(a) Variance

Request. Responses to comments from those other than PSE&G and USEPA

are included in Attachment D of this Permit. PSE&G's comments

("PSE&G's Comments" or "1991 Comments"). contained information, data

and argumeenzs not previously included in the administrative record

relevant to the Section 316,determinations. PSE&G's Comments raised

questions concerning certain information, data and assumptions that

formed the basis for the 1990 Draft Permit decision that

recirculating cooling towers are the Best Available Technology

("BAT") for controlling the thermal component of the discharges at

the Station and the Best Technology Available ("BTA") for minimizing

adverse environmental impacts resulting from the impingement and

entrainment of aquatic species by the Station's cooling water system.

On March 4, 1993, PSE&G filed a supplement to the Company's June 1990

Permit Aooicaticn ("1993 Application Supplement") incorporating by

~1

4Page 5 of 152 PagesFact Sheet/BasisNJ0005622

reference certain of the additional data and information presented in

the Company's 1991 Comments and proposing special conditions for a

draft NJPDES permit ("Draft Permit"). The Special Conditions propose

certain modifications to the intake screens, a limitation on the

volume of intake flow, a program to restore and enhance wetlands, a

fish migration barrier removal program, a study to determine the

feasibility of sound as a fish deterrent, and the conduct of a

baywide biological monitoring program ("Special Conditions"). The

1993 Application Supplement included a Technical Appendix which

generally provides the technical and scientific basis for the Special

Conditions. The 1993 Application Supplement also proposed effluent

limitations and associated terms and.conditions essentially similar

to those contained in the Station's 1989 NJPbES permit, the

performance of an Effluent Characterization Study, and, if required,

a Dilution Study.

In light of the information presented in the public comments on the

.1990 Draft Permit, the Department has reconsidered the decision to

require that the Station be retrofitted with closed cycle cooling.

As a result of this reconsideration, the Department is issuing this

draft NJPDES permit for the Station which proposes measures under

Section 316(b) which will minimize adverse environmental impact.

This Draft Permit also proposes to grant PSE&G a variance from

thermal surface water quality standards. This Draft Permit

incorporates Special Conditions proposed by PSE&G in the 1993

Application Supplement.I ->

Page 6 of 152 PagesFact Sheet/BasisNJ0005622

As indicated above, the 1990 Draft Permit contained a number of new

or revised effluent limitations and associated terms and conditions.

Many of those permit limits were predicated on the conditions of the

1990 Draft Permit requiring PSE&G to retrofit the Station with a

closed cvcle cooling system. As this Draft Permit proposes to allow

PSE&G to retain the existing once-through cooling water system, it

also proposes to incorporate many of the effluent limits and

associated terms and conditions of the Station's existing 1989 NJPDES

Permit, applicable to the once-through cooling water system, and

proposes requiring PSE&G to complete an Effluent Characterization

Study, Chronic Toxicity Characterization Study, and, if required, a

Dilution Study. Upon submission of the final reports for the

., Effluent Characterization Study, Chronic Toxicity Characterization

Study, and, if required, the Dilution Study, the Department will

determine whether water quality-based effluent limitations or

additional modified permit conditions are necessary. In this Draft

Permit, the Department has also modified the Station's existing 1989

permit (as modified, issued February 28, 1989) to change certain

monitoring requirements, address treatment system upgrades, and make

certain administrative corrections or amendments to update standard

permit terms and conditions.

This Draft Permit is being issued pursuant to N.J.A.C. 7:14A-1, et

seq. These regulations authorize the Department to issue a new draft

permit uocn a determination that any information, data, or argument

I

Page 7 of 152 Pages

Fact Sheet/BasisNJ0005622

presented during the comment period raises significant factual and/or.

legal issues concerning the permit.

II. DESCRIPTION OF FACILITY.

The Salem Generating Station is located on the southwestern side of

Artificial Island on the eastern shore of the Delaware Bay ("Bay",

"River" or "Estuary") in Salem County, New Jersey. The Station lies

about 50 miles northwest of the mouth of the Delaware Bay and 30

miles southwest of Philadelphia (See Figure 1 on page 15 of the Fact

Sheet/Basis). The River in the area.of the Station is approximately

2.5 miles wide. The tidal flow of the River past the Station is

approximately 400,000 cubic feet per second or 259,000 million

gallons per day ("MGD"). The River in the vicinity of the Station is

characterized by variable salinity, tidal currents, and a high

quantity of particulate material suspended in the water column.

The Station consists of three electric generating units. Units No. 1

and No. 2 are nuclear-powered, pressurized water reactors, each rated

at about. ,i00 MWe (3,400 MWt). Unit No. 3 is an air-cooled

combustion turbine rated at about 40 NWe. Unit No. 3 is used as a

peaking and emergency standby generator and has no discharge to

surface water. Units No. 1 and No. 2 use a once-through cooling

water system and are operated as baseload electrical generating

units. The Salem units were proposed in 1966 and construction was

Page 8 of 152 PagesFact Sheet/Basis

NJ0005622

started in 1968. Salem Units No. 1 and No. 2 have been in operation

for more than a decade, beginning commercial operation in 1977 and

1981, respectively.

Four basic steps are involved in the production of electricity at

Salem (See Figure 2 on page 16 of the Fact Sheet/Basis). Fission in

the nuclear reactors heats high purity water in each unit's primary

loop system. Heat is then transferred in a heat exchanger (steam

generator) to a secondary loop system, creating steam. The steam is

used to drive turbines so that some of the energy in the steam is

converted to mechanical energy. The turbines are connected to

generators that convert the mechanical energy of the rotating

turbines into electrical energy. River water is used to cool the

steam exhausted from the turbines and condense the steam in the

secondary loop system back into high purity water. This process is

known as non-contact cooling because the River water does not mix

with the Station's steam. The condensed high purity water is

returned from the condensers to the steam generators to be converted

again into steam to continue to drive the turbines. The River water

that passes through the condensers for non-contact cooling of the

secondary steam loop is discharged back to the River.

In addition to the discharge of non-contact cooling water, the

Station discharges other effluents including low volume waste streams

and storm water as discussed in more detail below.

4

Page 9 of 152 PagesFact Sheet/BasisNJ0005622

I* DESCRIPTION OF WASTEWATER DISCHARGES AND INTAKES

A. Station Outfalls

The Station is designed to discharge, at a maximum, approximately

3,200 MGD of once-through, non-contact condenser cooling water

through six submerged pipes or outfalls. designated as Discharge.

Serial Numbers (DSNs) 481-486. This non-contact cooling water exits

from the six discharge pipes at a rapid velocity (approximately 10

feet per second (fps)) at the bottom of the River (at center line

pipe depth of approximately 31 feet below mean sea level) about 500

feet offshore. The high velocity causes rapid mixing of the cooling

water with the River water.

Radioactive liquid waste, as permitted by the United States Nuclear

Regulatory Commission ("USNRC"), and non-radioactive liquid waste mix

with the cooling water and discharge to the River through DSNs 481,

482,- 484 and/or 485. Radioactive liquid waste, which averages

approximately 0.017 MGD, meets USNRC discharge limitations and

conditions. The non-radioactive liquid waste, which averages

approximately 0.26 MGD, is treated and monitored at an internal

monitoring point, DSN 48C, prior to mixing with the cooling water and

discharging. to the River through DSNs '481, 482, 48.4 and/or 485.

'

Page 10 of 152 Pages

Fact Sheet/BasisNJ0005622

The Station has other regulated outfalls or monitoring locations that

also discharge to the Delaware River. These outfalls include DSNs

487, 487B, 488, 489, 489A, 489B, 490 and 491. DSN 487B discharges

approximately 0.002 MGD of wastewater consisting of stormwater,

auxiliary boiler blowdown, and systems leakage to DSN 487, after.

treatment by oil/water skimming. DSNs 489A and 489B each discharge

approximately 0.003 MGD.of wastewater consisting of stormwater and

systems leakage to DSN 489, after treatment by oil/water skimming.

In addition to the discharges discussed above, DSNs 487, 488, 489,

490, and 491 discharge stormwater runoff from the Station.

A site map that illustrates all intake and discharge points is

presented in Figure 3 on page 17 of the Fact Sheet/Basis. A cutaway

view of the facility's cooling water system is presented in Figure 3a

on page 18 of the Fact Sheet/Basis.

B. Circulating Water intake System

The Circulating Water System ("CWS") intake, located at the

southwestern side of Artificial Island, .supplies water to cool the

condensers of Salem Units No. 1 and No. 2. The intake structure

includes 12 separate intake bays (six for each of the two Salem

units). Water enters the intake bays through mechanically cleaned

trash racks (one per bay), each approximately 11 feet wide and 51

feet long. The trash racks are constructed of 0.5 inch wide steel

bars on 3.5 inch centers; the size of the slot opening is 3 inches.

Page 11 of 152 PagesFact Sheet/BasisNJ0005622

After passing through the trash rack, water, debris, and.some small-

sized aquatic organisms are drawn onto and through an uninterrupted

linkage of continuously operating vertical traveling screens (3/8

inch mesh panels) (See Figure 4 on page 19 of the Fact Sheet/Basis).

The screens normally rotate continuously at 0.9 inch/second. Faster

screen rotation speeds are used at times of high debris loadings.

The traveling screens are equipped with Ristroph-type fish buckets

fitted to the base of each screen panel. The buckets are designed to.

prevent aquatic organisms caught or impinged on the screens from

falling back into the screen bay and becoming re-impinged. Fish and

small debris collected on the screens. fall into the buckets as each

screen panel is lifted above the water for cleaning. The organisms

remain in a water-filled bucket as the screen panel is rotated over

the top of the screen assembly where a low pressure spray washes the

organisms into a fish return system. High pressure sprays are then

utilized to remove remaining debris.from the screens. Fish and

debris washed from the screens are returned through bi-directional

sluices to the Estuary on either the north or south side of the

intake, depending upon the direction of tidal flow, thereby allowing

the tidal current to carry the fish and debris away from the intake.

A vertical wet-pit CWS pump, having a design flow of 185,000 gallons

per minute ("gpm") (266 MGD), is located in each of the 12 CWS.intake

bays. When all 12 pumps are in service the design withdrawal

capacity of this intake is 3,197 MGD.

Page 12 of 152 PagesFact Sheet/BasisNJO005622

C. Service Water Intake System

The Service Water System ("SWS") intake, a nuclear safety-related

system, supplies water to cool the heat exchangers and coolers used

in conjunction with the reactors, generators, and auxiliary

equipment. The SWS intake is located approximately 490 feet upstream

(north) from the CWS intake. It consists of 12 intake bays arranged

in groups of three and alternating between Units No. I and 2. Water

enters the bays through mechanically cleaned trash racks constructed

of 0.5 inch wide steel bars on 3.5 inch centers, so that the size of

the slot opening is 3 inches. After passing through the trash rack,

water is drawn through conventional vertical traveling screens (3/8

inch mesh). A 10,875 gpmr (15.7 MGD) vertical, deepwell turbine pump

is located in each of the 12 intake cells. With all twelve pumps in

service, the design withdrawal capacity of this intake is 188 MGD.

IV.- DESCRIPTION OF DRAFT PERMIT CONDITIONS

The existing/proposed effluent limitations, effluent sampling

analytical data, and other pertinent information are described in the

Permit Summary Tables. Also included is a summary of the basis for

each effluent limitation and other conditions in the Draft Permit.

Page 13 of 152 Pages

Fact Sheet/BasisNJ0005622

V. WATER QUALITY-BASED PERMIT LIMITS

The Department requires additional information on the character of

the Permittee's effluent before determining whether water quality-

based effluent limitations (non-thermal) ("WQBELs") are necessary.

The Draft Permit requires the Permittee to perform an Effluent

Characterization Study, a Chronic Toxicity Characterization Study,

and a Dilution Study. Upon receipt of the results of these studies,

the Department may develop and apply WQBELs under applicable laws and

regulations.

VI. PROCEDURES FOR REACHING A FINAL DECISION ON THE DRAFT PERMIT

The procedures for reaching a final decision On the Draft Permit are

set forth in N.J.S.A. 58:10A-7, N.J.A.C. 7:14A-7.1 et seq. and

N.J.A.C. 7:14A-8.1 et seq. Included in the procedures are

requirements for the submission of comments by the close of the

comment period, scheduled. dates and procedures for a non-adversarial

public hearing, and other procedures for participation in the final

agency decision.

N.J.S.A. 58:10A-7 and N.J.A.C. 7:14A-8.9(j) provide that

applicants/permittees/interested parties who believe the Department's

tentative decision is inappropriate must raise all reasonably

ascertainable arguments and factual grounds supporting their position

Page 14 of 152 P.s aFact Sheet/BasisNJ0005622

on these issues, including all supporting material, by the close of

the public comment period. If the applicant/permittees/interested

party fails to raise any reasonably ascertainable issues at this

time, it is deemed to have waived the right to raise or contest any

such issues in any subsequent adjudicatory hearing or appeal. All

supporting materials must be included in full and may not be

incorporated by reference, unless they are already part of the

administrative record in the same proceeding, or consist of State or

Federal statutes and'regulations, USEPA documents of general

applicability, or other generally available reference materials.

VII. NJDEPE CONTACT

Additional information concerning the revised Draft Permit may be

obtained between the hours of 8:00 a.m. and 4:30 p.m.,. Monday through

Friday, by contacting Richard Hyjack in the Bureau of Standard

Permitting at 609-292-4860.

(0

NJ 0005622NJO005622

9 ~~PENNSYLVANIA TETNLi*~l

PHILADELPHJA s 131

CHESAPEAKE &DELAWA.E CANAL

WIIMINGTON

RM 75 ,

REEDY ISLAND

2 ARTIFICIAL ISLAND 4

* SALEM NUVCLEAR 4GENERATLNG STATION

LISTON POINT

. • ( RM 25..DELAWARE BAY ,/.

ATLANTIC OCEAN~RM 0

CAPE HENLOPEN

DELAWARE 5 10

MDLES

INDIAN RIVER INLET 5O mi

Figure 1. Map showing location of Salem Nuclear Generating Stationwithin the Delaware River Estuary. Location of wetlandsadapted from NOAA nautical charts (1988, 1990; and 1991).

React'Vesse

SIMPLIFIED STEAM ELECTRIC CYCLE

Control Rod Steam Pipe Turbine Generator

Drive MechanismPressurizer A

SteamWGeneratoC lti

Output T

or,, I To

rRiver

Cnoade cerr

CoolingConK

Reactor Water .

Fuel CoreCnn C WFrom

thevRiver•.

~Circulating :

: ~Water

-Primary Intake C4 W

.. ...... 0 Q :LO

P."ump Coolant Key 0 r-r (D"

0(,_n (n t

•' • ~~~~Reactor Coolant W ater ou - .]N)(CD"J• Steam N) (D o .

111 [Condensate '

1= Cooling Water from 0) Cn •.1

the River (1 :)

(1

NJ-UUUZ')

9 LEGEND

1 BARGE SLIP2 SERVICE WATER INTAKE3 SALEM FUEL OIL STORAGE TANK4 GUARD HOUSE .

5 TURBINE BUILDING.6 REACTOR BUILDING7 AUXIUARY BUILDING8 #1 OIL/WATER SKIM TANK9 #2 OILWWATER SKIM TANK10 #3 OIL/WATER SKIM TANK11 NON-RAD LIQUID WASTE

DISPOSAL SYSTEM

c. DN 481

DSN4 490

Wo KV 8"TCHYAAD

LI SECOND SUN

q• ~94I D ,.•SNE SA• DSN,4

10

L -7

0SN "7B 000 FUEL 000BLDG

SECURlY *SALEM GENERATIING STATIONFENCERT GENERAL SITE MAP

NJPDES PERMIT NO. NJ0005622JUNE 1993

Fig ure 3

9 K~J

C4 D)2 (2

0

t'J (D C,

rfh

En1

1.2.3.4.5.

Reactor ContainmentsTurbine BuildingCirculating Water IntakeService Water IntakeSwitchyard

6. Condenser Inlet7. -Condenser Outlet8. -Reactor -9. Steam Generator

10. Turbine11., Generator12. Circulating Water13. Circulating Water

DischargeInlet Piping

Cutaway View of Salem Generating Station

with Existing Circulating Water'Systeme 'tFigure 3a

NJOo05622

RISTROPH MODIFIEDVERTICAL TRAVELING SCREEN

Fish Bucket

Travel

", High-Pressure Wash"'0 Low-Pressure Fish Wash

Flow

01pFIGURZ 4

(9 P'IRMIT "IARY TABLE

Com~pany: t'Sl&(; - Satesin (inerafing StationI .:aIih;;!: 39N 28in 15Ss

Permit No.: NJ0005622Longitude: 75W 32m 30s

Discharge Serial No.: 481,482,483,494,4R5,486Receiving Stream: Delaware River

\W;,stwater Type: Non-contact cooling water, NRLW1DS effluent and RI.W eMuent

Technology State & l)RBC Existing Permit Draft I'ermit

Available Data Based Limits Regulations Condition Effluent Limit

Paramcler (all valnes are in mg/l IAong-'l'erm DLY # MON DLV MON DLY MON DLY MON DLY

unless otherwise staled) AVG. MAX Samples AVG MAX AVG MAX AV, MAX AVG MAX

'Total influent Flow (M(;l)) (I) ... ... ..... 3,024 NI.

ErSnuent Flow (M(;D) (2) (I) 7-- .. ... NI. NL NL NL

Temperature - Influent "C (3) (I) .. . .. NI, NL. NI, NL

T'mperature - Efluent "C (3) (I) - - NI. 46.1(5) NL 46.1(5)

Temperattre - Difference "C (3) (1) .. .. . NL 15.3 NL 15.3'

ilteat, Facility (MIITU/hour) (4) (I) .. . .. NI., 30,600 NL 30,600Tolal Residual Chlorine (2) (I) 0.2 --- 0.3. 0.5(6) 0.3 0.5(6)

Total Organic Carbon -- 2.4 1(7) .. .. .....

COD) ... 21 i(7) .... ... --

10)0 --. 2.6 !(7) .... ... --

Total Suspended Solids --- 40 1(7) --- .. 30 100 .. ....

loll Itange (S.U.)(2) (7) 6.0-9.0 - -- 6.0-9.0 6.0-9.0

Ammonia -- 0.16 1(7) - - 35 . ....

Acute Toxicity (%) . . . . . 7- - - - LC50>50%(8)

Chronic Toxicity (NOEC, %EFF) .. ...- - - - NL(9) NL(9)

Boron - 0.24 1(7) .. .. ....

Copper, Total ' 0.004 1(7) - - 0.2 -...

(I) See Permit Summary Table, DMR Data, for DSNs 481-486.(2) These limitations apply to each outfall, DSNs 4814R6.(3.) These limitations apply to each unit, DSNs 481-483 (FAC A) and DSN9 484486 (FAC B).(4) These limitations apply to the combined facility discharge, DSNs 481-486 (FAC C).(5) This limitation shall apply from June I through September 30; from October I through May 31, the maximum limitation shall be 43.3*C.(6) These limitations shall apply when only service water system non-contact cooling water is discharged. When circulating water system non-contact

cooling water is discharged, the maximum limitation shall be 0,2 mg/l.(7) Data reported on Form 2C-V in Application dated June 1, 1990.(8) Acute Toxicity limitation of LC50>50% is the minimum limitation and is equivalent to 2TUa's (Acute Toxicity Units) maximum.(9) Chronic Toxicity is reported as a minimum and is performed in conjunction with the Effluent Characterization Study.

NOTE: NI, denotes "Not Limited" with both monitoring and reporting required.

4 0Page 20 of 152 PagesFact Sheet/BasisNJ0005622

I)ischarge Numbers:

PERMIT aý)u,-MARY TABLE

DMR DATA (I)

481, 482, 483, FAC A

484, 485, 486, FAC B

FAC C

DSN 481. DSN 482 DSN-483 DSN 484 DSN 485 DSN 486

I'araineter (all valuesare in nigil unless AVG MAX NO. AVG MAX NO AV(; MAX NO AVG MAX NO AVG MAX NO AVG MAX NO

othu.rwkse %fated) (2) (3) (4) (2) (3) (4) (2) (3) (4) (2) (3) (4) (2) (3) (4) (2) (3) (4)

IIfflu'til Flow (M(;D) 442 533 C 424 533 C 347 533 C 348 533 C 368 533 C 350 533 C .

Total Residual Chlorine 0.01 0.21 546 0.01 0.95 546 0.01 0.20 .546 0.01 0.30 546 0.01 0.30 546 0.01 0.2-3 546

pl[ Range (S.U.) 6.3 8.1 182 6.5 8.2 182 6.5 8.2 182 6.1• 8;2 182 6.3 8.5 182 6.1 8.7 182

(MIIN/NMAX)

.____._

FAC A (5) FAC 1 (6)

Tlentprratture, Influent 14.0 AVG 28.5 MAX Continuous 13.7 AV(; 27.9 MAX Continuous

"C

Ieniperature, E.nuent 22.8 AVG 37.7 MAX Continuous 22.1 AVG 38.1 MAX Continuous"

Temperature, 7.6 AVG 15.3 MAX • Continuous . 8.2 AVG 15.3 MAX Continuous

I)ifferen(ial, *C ,____

FAC C (7)

I heSt (MBTU/hour) 12,794 AVG 29,835 MAX Continuous

(I) Data as reported on Discharge Monitoring Reports for the period January I, 1989 through June 30, 1992.

(2) AV(; is long-term average.

(3) MAX is daily maximum.

(4) NO is number of samples reported; C indicates continuous monitoring.

(5) FAC A is the combined discharge from Unit No. I including DSNs 481, 482, and 483.

(6) FAC R is the combined discharge from Unit No. 2 including DSNs 484, 485, and 486.

(7) FAC C is the combined discharge from tihe facility including D)SNs 481, 482, 483, 484, 485, and 486.

Page 21 of 152 PagesFact Sheet/BasisNJ0005622€

PERRN:.ý.. MMARV TABLE

Company: I'SE&G - Salem Generating Station Permit No.: N,10005622 Discharge Serial No.: 48C

Latitude: N/A (4) Longitude: N/A (4) Receiving Stream: N/A (4)WVzasteNvater Type: Treated regeneran! waslewaler, chemical drains, analytical equipment wastewater, steam generator drains and /lxor drains.

TehnoloXN Based I State & DRHC Existing Permit Driaft Permit

Available Data Limits Regulations Condition Efmuut Limit

Parameter fall values are in mngf l.mng-Term DLI , MON l)LY MON DLY MON DLY MON DL.Yminlhs othernwie sated) AVG MAX Samples AVG MAX AVG MAX AVG MAX AVG MAX

I'lOw (N•I(CD) 0.2 01.9 (,'(1) ---... ---.- N I, "NI, N1, NI,' :

l'etroleum llydrtm'artmn 0.3 7.4 84(l) .... 10. Is t0 15 to Is

"lol Organic Carbon 4.9 102 50(I) ... ... .- --- --- -. NI. 50

Ct1h1 iical (hxygei l)nn uw d 14.9 162 84(l) --- 50 - -- NI. 100 ......ItO D --- 2.4 1(6) ...... ---. .....--

Toial .I l mipended Solids 8.2 58 84(l) 30 100 30(2) •-- 30(2) 100 30(2) too

pJA Range (S.U.) 6.0-9.0 .---. 6.0- 9.0(0) 6.0-9.0(3)

Ammonia 22.1 79.6 84(f) -- = -- 35 -- 35 70 35 70

Acute To"icity (•) 86 100 16(l) ... IC.50> 50%0(7), -..

Chromium. Ilex 0.03 0.1)5 6(1) -- -- ---. --- .--

Coppeir. Total 0.07 0.31 .7(5) ---.... -..

Iro .I Total 0.45 2.2 7(5) ..--- --- ...

Lead. Total -- 0.004 1(6) .... .... ,.- -

NickAl Total -- 0.09 1(6) .- -...............

Nitrate-Nitrite -- 0.011 1(6) .......... - " i

llenoLs. Total 0.008 1(6) ....... .. .

Phosphorus -- 0.9 10(6) " - -- •-,- - - [F

.Sulfale 10,000 1(6) . . .... --

Sulflide 1.9 1(6) ,-----

Total Organic Nitrogen - 6 1(6) ---

Zinc, Total 0.03 0.16 7(5) ... ... - -

(I) Data reported on Discharge Monitoring Reports for the period January I, 1989 through June 30, 1992.

(2) Also, TSS shall not exceed 45 mn/! as a 7-day average.(3) pil shall be monitored and reported at the respective outfall DSNs 481, 482, 484, and/or 485.(4) Internal wawte stream discharging through DSNs 481, 482, 484, and/or 485.(5) Data reported on Discharge Monitoring Reports for the period January J, 1989 through March 31, 1989 and also data reported on 2C-V in Application dated June

I, 1990.(6) )ata reported on Form 2C-V in Application dated June 1, 1990.(7) Acute toxicity limitation of LC50_> 50% is the minimum limitation and is equivalent to 2TUa's (Acute Toxicity Units) maximum.

NOTE: NL denotes "Not limited* with both monitoring and reporting required. C indicates cootiuous monitoring.2 Pages

Fact Sheet/Basis

,J1005622

.9.>PERMIT SUTMMARV TABLE

Company: PSE&G - Salemn Generating Station Permit No.: NJ0005622

Latitude: 39N 27m 45s Longitude: 75W 32m 00s

Wastewater Type: Effluent from DSN 487B, stormwater, groundwater, and flood

Discharge Serial No.: 487Receiving Stream: Delaware River

pump discharge.

Technology State & DRFC Existing Permit Draft Permit

Availahle Data Based Limits Regulations Condition Emuent Limit(S)

Parameter (all values are in DLV # MON DLY MON DIY MON DLY MON DLY

mg/I unless othenvise stated) MAX Samplhs. AVG MAX AVG MAX AVG MAX ]AVG MAX

Flow. (MGD) 0.04 3(I) --- --- --- --- NL NL ---. ...

Petroleum Ilydrocarhons(3) 0 3(I) --- --- 10 Is 10 15

Total Organic Carhon(3) -2 2(I) --- --- ---... . . .. .....

COD(3) 2'. 3(0) ..... .. .. . NL 100

BO D 9-1(4) ---..... .... ......

Total Suspended Solids(3) -73 3(0) --- -.-- 30(2) ... 30(2) '100 ---

p1l Range (S.U.) (MIN/MAX). 7ý0J7.6 -. 3(0) 6.0-9.0 6.0-9.0 6.0-9.0 ---

Ammonia 0.205 1(4) .. --- --- - -- --- ---

Cadmium, Total 0.004 1(4) ---. -

Chromium, Total 0.006 1(4) "--- --- ---- -. " ..

Copper, Total 0.004 1(4) .. . .... ... --- . .. -- --

Lead, Total 0.003 1(4) -. ..-- -. ... .. .. ...

Mercury, Total 0.0019 1(4) --- ........ ...... .

Phenols, Total 0.068 1(4) ....--- --- --- ------.

Zinc, Total 0..04 1(4) ---.. . .. .. --- ......

(1) Data reported on Discharge Monitoring Reports for the period April I, 1989 through June 30, 1992.

(2) TSS shall not exceed 30 mg/Il as a 30-day average and 45 mg/I as a. 7-day average.

(3) These parameters are reported as the net concentration discharged relative to the receiving wa(erbody.

(4) Data reported on Form 2C-V in application dated June 1, 1990.

(5) This discharge shall no longer be a monitored oulfall.

NOTE: NL denotes "Not Limited" with both monitoring and reporting required.

.[

i

Page 23 of 152 PagesFact Sheet/BasisNJ0005622

-- PERMIT , ?IARY TABLE >1

Company: ISE&G - Salem Generating Station Permit No.: NJ0005622 Discharge Serial No.: 487BLatitudh: 39N 27m 45-; Longitude: 75W 32m 00s ReceivingWastewafle Type: Stormwater, Equipment Drains, Aux Boiler Blowdown, Floor Drain`s

Stream: Delaware River

Available Data Technology Slate & DRBC Existing Permit Draft PermitBased Limits Regulations Conditions Emfhtent Limit

P'aramelvi- (aIll valuLts are in

mg/1 uinth,,, othenvise st~aied) Long-Term DLV # MON DLY MON DLY MON DLY MON DLY

AVG MAX Samples AVG MAX AVG MAX AVG MAX AVG MAX

now (.M;f)(3) 0.002 0.002 39(l) ........ NI NL Nt NL

Teopea:a etr:luhent W(" 25.8 56.7 39(1) ..... 43.3 NI 43.3 NL 43.3

Petroleum Ilydrocarbons 0.6 5.3 39(1) .... 10 15 10 I5 10 15

Total Orga;nic Carbon 1.9 6.5 28(I) --........ NL so

COD) 10.5 75 39(0) ........ NI too

1 O I) -- 15 1(4) ,..*- ........... .

Totfal SuNpended Solids 3.2 28 39(l) .... 30(2) -- 30(2) 100 30(2) 100

pit Range (S.U.)(MIN/MAX) 6.8 8.0 39(f) 6.0-9.0 6.0-9.0 6.0-9.0 6.0-9.0

Amnmonia -- 0.47 1(4) ......

Cadminitam, Total - 0.002 1(4) ...............

Copper, Total -- 0.003 1(4) -- " ............. •

Phenols, Total 0.083 0.18 4(5) - - ................

(1) Dala reported on Discharge Monitoring Reports for (he period April I, 1989 through June 30, 1992.(2). TSS •'iall not exceed 30 mg/I as a 30-day average and 45 mg/I as a 7-day average.(3) Flow i% calculated based on non-precipitation related estimated discharge plus the calculated precipitation related discharge for the reporting period.(4) D)aia rcported on Fdirm 2C-V in Application dated June 1, 1990.(5) Data reported on Form 2C-V in Application Supplement dated January 10, 1991.

NOTE: N1 denotes "Not Limited" with both monitoring and reporting required.

a.

Page 24 of 152 PagesFact Sheet/BasisNJ0005622

••0

@7PERMIT SUMMARY TABLE

Permit No.: NJ0005622Longitude: 75W 32m 00s

-0Company: PSE&G - Salem Generating StationLatitude: 39N 27m 45s

Discharge Serial No.: 489Receiving Stream: Delaware River

Wastewater Type: Emuent From DSN 489A and DSN 489B and Stormwater

Technology State & DRBC Existing Permit Draft Permit

Available Data Based Limits Regulafions Condition Effluent Limi((4)

Parameter (:all values are in DLV f# MON DLV MON DLY MON DLY MON DLYmg/I unless otherwise stated) MAX Samples AVG MAX AVG MAX AVG MAX AVG MAX

Flow (MGD) 0.01 3(1) --- --- NL NL NL NL

Petroleum flydrocarhons 6.8(3) 3(l) --- --- 10 15 10(3) 15(3) 10 is

Total Organic Carbon -0.3(3) 2(l) ... ... ... ... ... ... NL 50

COD 5(3) 3(l) --- --- --- .. NL(3) 100(3)BOD 36 1(5) --- --- --- --- ..

Total Suspended Solids -41.8(3) 3(t) --- --- 30(2) ... 30(2)(3) .100(3) 30(2) 100

pil Range (S.U.) (MINIMAX) 7.1/7.6 3(1) 6.0-9.0 6.0-9.0 6.0-9.0 6.0-9.0

A m m onia 1.18 1(5) ....--- --- . .. .......

Cadmium, Total 0.005 1(5) --- --- ---.. .. ....

Chromium, Total 0.004 1(5) ....--- ---. ... . -.

Copper, Total 0.017 1(5) "--- --- ----.

Lead, Total 0.004 1(5) --- --- --- ---....... -

Phenols 0.096 1(5) ....--- --- --- .-....

Zinc, Total 0.08 1(5) --- --- ...... ..---......

(1) Data reported on Discharge Monitoring Reports for the period April 1, 1989 through June 30, 1992 for the outfall specifiedin the 1989 NJPDES permit.

(2) TSS shall not exceed 30 mg/I as a 30-day average and 45 mg/i as a 7-day average.(3) These parameters are reported as the net concentration discharged relative to the receiving waterbody.(4) These limitations.and-conditions shall apply.upon commencement of operation of the Oil Water Separator System. Until this

Oil Water Separator System is installed and operational, this discharge shall not be a monitored outfall.(5) Data reported on Form 2C-V in application dated June 1, 1990.

NOTE: NL denotes "Not Limited" with both monitoring and reporting required.

Page 25 of 152 PagesFact Sheet/Basis !NJ0005622"

-I

PERKa-ý4 SUMMARY TABLE

']

.Company: PSE&G - Salem Generating Station Permit No.: NJ0005622

Latitude: 39N 27m 45s Longitude: 75W 32m 00s

Wastewater Type: Effluent From DSN 489A and DSN 489B and Stormwater

Discharge Serial No.: 489Receiving Stream: Delaware River

Technology State & DRBC Existing Permit Draft Permit

Available Data Based Limits Regulations Condition Effluen Limit(41

Parameter (all values are in DLY # MON DLY MON DLY MON DLY MON DLY

mg/l unless ogherwise stated) MAN Samples AVG MAX AVG MAX AVG MAX AVG MAX

Flow (MGD) 0.01 3(i) --.. ... .--- --- NL NL NL NL

Petroleum Ilydrocarbons 6.8(3) 3(l) --- --- 10 15 10(3) 15(3) 10 15

Total Organic Carbon -0.3(3) 2(0) ---- --- NL 50

COD 5(3) 3(0) -- -.-... .. NL(3) 100(3)

BOD 36 1(5) ---.--- --- ---......

-.Total Suspended Solids -41.8(3) 3(1) --- --- 30(2) --- 30(2)(3) 100(3) 30(2) 100

phl Range (S.U.) (MIN/MAX) '7.1/7.6 3(0) 6.0-9.0 6.0-9.0 6.0-9.0 6.0-9.0

Am m onia 1. 18 !(5) ... ........ .......-. . ..

Cadmium, Total 0.005 1(5) ... ... .. ... ..-.. ..

Chromium, Total 0.004 1(5) , --. -.--..... . . "

Copper, Total 0.017 1(5) --- --- --- --- ---

Lead, Total 0.004 1(5) --- ---... ... .....

Phenols 0.096 1(5) .......--- ---...

Zinc, Total 0.08 1(5) ------ --- --- ---..

(1) . Data reported on Discharge Monitoring Reports for the period April 1, 1989 through June 30, 1992 for the outfall specified

in the 1989 NJPDES permit.

•(2) TSS shall not exceed 30 mg/I as a 30-day average and 45 mg/I as a 7-day average.

(3) These parameters are reported as the net concentration discharged relative to the receiving waterbody.

(4) These limitations.and-conditions shall apply upon commencement of operation of the Oil Water Separator System. Until this

Oil Water Separator System is installed and operational, this discharge shall not he a monitored outfall.

(5) Data repoited on Form 2C-V in application dated June 1, 1990.

NOTE: NL denotes "Not Limited" with both monitoring and reporting required.

Page 25 of 152Fact Sheet/BasisNJ0005622

Page,

I ~ ~

PERM, NIMARY TABLE

Cnnpan y: PSE&G Salem Generation SLation Permit.No.: NJ0005622 Discharge Serial No.: 489AL.ati~tide: 39N 27m 4 5s Longitude: 75W 321n OOs Receiving Stream: Delaware River

%%'a,,t•vater Type: Tret~ied.Stormwaler, Turbine Sumps, and Transformer Drains

Technology State & DRBC Existing Permit Draft PermitAvailable Data Based Limits Regulations Condilton Emfuent

Limit(3)

Parameter (all values are in Long-Term DLY # MON DLV MON DLY MON DLY MON DLYmg/I unless otherwise stated) AVG MAX Srnples AVG MAX AVG MAX AVG MAX AVG MAX

Fhlw (MGD) 0.003 0.003 39(0) ---. --- --- .. . NL NL NL NL

Petroleum llydrocarlomus I 9 39(l) --- --- 10 15 10 15 i0 15

Tot:al Organic Carbon 2.8 6.1 28(-) --- . . -. NL 50

COD) 22.3 78 39(1) --- --- --- ---. NL 100 ---. ...

RO D 1 - 4 . 1(4) " --.. " -- -.... - -

Total Suspended Solids 4 27 39(1) --- 30(2) --- 30(2) 100 30(2) 100

pit Range (S.U.) (MINIMAX) 6.3 8.2 39(0) 6.0-9.0 6.0-9.0 6.0-9.0 6.0-9.0

Am monia --- 0.54 1(4) " -- --- --- --- ---

(1) Data reported on Discharge Monitoring Reports for the period April I, 1989 through June 30, 1992.(2) TSS shall not exceed'30 mg/I las a 30-day average and 45 mg/l as a 7-day average;(3) The limitations and conditions shall only apply until installation and operation of the Oil Water Separator System at DSN 489. At

that time, DSN 489A will not he an outfall. -

(4) -Data reported on Form 2C-V in application dated June 1, 1990.

NOTE: NL denotes "Not Limited" with both monitoring and reporting required.

Page 2.6 of 152 Pages-Fact Sheet/BasisNJ0005622.

PERMI ;.1MARY TABLE

Company: PSE&G - Salem Generating Station Permit No.: NJ0005622 Discharge Serial No.: 489B

l,ahiiide: 39N 27m 4Ss Longitude: 75W 32m ON Receiving Stream: Delaware River

\Vastewater Type: Treated slormwater, turbine sumps, and transformer drains.

I a

Technology State & DRBC Existing Permit Draft Plennit

Available Data Based Limits Regulaiions Condition Effluent Ihnit(4)

Parameter (all values are in Long-Term DLY # MON DLV MON DLY MON DLY MON DLY

mg/I unless otherwise stated) AVG MAX Samples AVG MAX AVG MAX AVG MAX AVG MAX

Flow (MGI)) 0.003 0.003 39(1) --- --- --- NI, NL NL NL

Petroleum Hlydrocarbons 2.7 24 39(l) . . . .. 10 15. 10 15 10 15

Total Organic Carbon 4.3 II 28(t) --- --- --- --- --- NL so

COD 33.1 94 39(0) --- --. ...- NL 100 --- ---

BO 1D --- 7.5 1(3) -- --.... .......

"iolal Suspended Solid- 12.6 33 39(l) --- --- 30(2) --- 30(2) 100 30(2) 100

pll Range (S.U.) (MIN/MAX) 6.6 8.5 39(0) 6.0-9.0 6.10r9.0 6.0-9.0 6.0-9.0

Ammonia . -- 1.27 1(3) --- --- ---

(I) Data reported on Discharge Monitoring. Reports for the period April 1, 1989 through June 30, 1992.

(2) TSS shall not exceed 30 mg/I as a 30-day average and 45 mg/I as a 7-day average.

(3) Data reported on Form 2C-V in application dated June 1, 1990.

(4) These limitations and conditions shall only apply until installation and operation of the Oil Water Separator System at DSN 489. At.that time,

DSN 489B will not he an outfall.

NOTE: NL denotes "Not Limited" with both monitoring and reporting required.

Page 27 of 152 Pages

Fact Sheet/Basis

NJ0005622

~B}

t-4

Lu

0*.- ...

t

z ýjI

to

r*-

01

0W~-WAMA

Oý"W ANO1W f-04 -_,-oftvfo U @A

Na

44 MOO

*. MAW AU AN OMVAWIQUO-

I& (3 SOMWF ow ac aeLm?~ TA

* WA In. M1"~miwin

&#M.EM 004WPTMd 8TAIONNipm EUW No. minesmSCKOhA1TC OF WATER FLOW

Page 295 Of §2

Fact Sheet/Basis

NJ0005622

SALEM OOEPATI4 ITATMN• A11C OF WATER FOW

-Ex)OKAM1 OF NOTES

A T r,:r,-ow =N ,te ,e saw c dobe' wtv psu tN tnh mckL rnkrr ate Is wLihW trm 12- kn a h sCrw wo DVZ*twru R,?v Vwt a" • wod to t Dd'eRhvw.

htto trbV* •bdI•, Rgood Puo ve dsI*,t w0 cc*= 6 4 er • from ftie tLi bW "In ev* t ww ofi~ Tod hey ant asomstdcaty ew$rgzo whe wi 4 In to oo waff rudche

Ni Wep~kC rN. setpokit is above fte OP*ra&g IeM dte Ublie bu*g ufl w~divc-Wgs dtciugh DSN 'eSA "M 'WO. The tutbir bL&*Vg SO pi5?p4 &etyc opwwd lh aEcx&Mg wgr~vy exceo Ict mk&*e tbov to wfy oerelty.

C Moncitr Tank ofuemt is ft dkscxag krm toe rmdkao4ý M A *1*0t ryKvnIli rw mltM was' •em dschuW •r i:'gh . SN 481. 4a 4U. "/Ofr 4K Tw 'mdk•'tycorwcflratkr quantte.a" rate amt rogiitd ar&UiTid by tie U3 Nudw Rs~iatory

D Ttv Nvoklce*oe UqtiM W tese Oto O Sytem •qLdV1•A treds cwi l u•i •'fl m ftt rfty,,M t P",b.a~ra i deW In Ns ap~ksW AS OSN 48t

E The serMIc vitv kihake cwwware duesrd by APP*'kg Vi~ 'Qev kw r." water aeMa~t* debiis to be cd¶.ci.d In a bask ot for dispmW gI a WarufU "M wACO wcl to dbdie" dhecfybackc to the 0a0rwe Rlvvf. ThI otA'J dbchcrgft wth fti wv~ fm -P bdmE

Th kvw bywRyr*i fleIo'a fti disc"w of ft ie c waly P~iero$ to be rmumW *hfy lo ftiDetawire ")' Ntouh fte srro WW~p usW Vo *C1Waa dischare o rwujwrwe of ft lowftron each pjxv%. This wolonk oondructed try d~et1iQ U the kwo aM wA UM WRW PXI. iga rite di appudrdmazy IZOOO galon per mhUkt beck 10ti V a*, irtl a *'Wto aiOW a U Bowmrusvsmen d fte pxni capedly. LuHN~ ftO. tbspen ".afte V* t XýMC ohypocNcwte *9 be tew'nhnated VM ftiedtct to ft ie 9 Rhvv wl t* fte hlaks *ulw bm

0 The oR~aI bvert*&3 as Om 4m0 cortswsi cty of a oondul PrOMNg to 's wA* erblwrwigto 0ow pr~~to rurof to Sow :t*'ar tie ODrw'a r.R.w

FIGURE 5 (cont)

WELL WATER FIESUOXLV. DILUTE ACIDIUSTIC

CHEfMICAL I-ANDUNCI AREA DRAWSzzz

ULTRAPUAE WATER FROM ANALYZER DRAI,•S 0

REENPERANT WASTE TRIEATED PLJE WATER - INFREOUENT

NRW# SYSTEM VENTS. DRAINS AND RECYCLE

I "

CONENSWATER (

POUSHNIEMIR TAK IAF

E0EERAT W .S WASTE SLUDGE BLOWDOWN " T R ;TE

Ci ,EWAS STLELUOO o

M0 TA HODIRAANM

NO. -" SALEM GENERATING

ISTATION ARE

•o •coJ• fNON-RAD LIQUID WASTE DI:SPO:SAL t'J :(U•

~~~NJPDE:S PERMIT NO NJ0005622 -t

SLUDGE PUMPED BY VACUUM TRUCK NJPDES - DSN 48C

FOR HAZARDOUS WASTE DISPOSAL MAY 1990

4&01ACIICLJ71

UPAWNDNG ,NC

DRAM

CB 1 C13CB 18

-c21V V1LM

FMPWQ :jjA 2__

LU _ _ _ _ _ _ _

NORT SEWC ft.G CNOP

CB3O~ PP.S

NN AMJ- E 6

MJE'OPEUWALL.OSNAu7

0 0: 0

Sift POINEIR ThA=s0alR UN M)HZ CB.48S TA POWIER W.AM909WER S(AWS312

M FCPOWR TPANSF 0AWAf

CO804 i9I4

%fe StUw P~

CPR#1DN

MANC84 PASOPARCB6 PNSDMR

2i.Z~24.2!

$"A~~~~~~t TAN SKATN ueShCPA02 ~ ~ ~ ~ r ALI FIAT~4 R

C875AS1

M VNLOACC9 00 .0

00 coc=C9 4

N---

i

1j.

'-1

'0

:4p

oLy0

0'J

OQ

0

9..•

.0 rt~ (C

(-th

" :1:iLa eI-

U)

/J

C831

F rp "Ce 32 AýFf r

C, , 1 P -. A bt P:,

• ,,._P• *'- .o i k*.. -.

CS - ~ o3 7 i

ce 34

092 P" d bm .Am vp Pw.Fin . .I§*w f~0 W ca 35

C8 I

• .i':ij

Ii,

[IoI1 Cee 29s Ce- #1

cew f1 " oil

SALEM GENERATING STATION ' " Flo- o cta

WEST YARD DRAIN L co UNJPDES PERMIT NO. NJ0005622 •DELAWARE

NJPDES OUTFALL - DSN 488 RVR( l'JANUARY 19 • RVR-l•

(1

• • U

9 0CB 91 .CB

SALEM GENERATING STATION VEAST YARD DRAIN Delaware RiverNJPDES PERMIT NO. NJ0005622

NJPDES OUTFALL - DSN 491MAY 1990

Figure 12

Page 37 of 152 PagesFact Sheet/BasisNJO005622

STATEMENT OF BASIS

DRAFT NJPDES PERMIT MODIFICATION TODISCHARGE INTO THE WATERS OF

THE STATE OF NEW JERSEY

NJPDES APPLICATION NO. NJ0005622

I. DESCRIPTION OF WASTEWATER COM4PONENTS

The background information presented in this section relating to the

composition of the wastestreams contributing to each outfall is based

on (1)' the Permittee's application dated June 1, 1990 and supplements

thereto dated August 31, 1990, January 10, 1991, and April 23, 1991

("1990 Permit Application"); (2) the Department's site inspections on*

September 4, 1990 and February 23, 1993; (3) section II of Volume 62

of PSE&G's 1991 Comments; and (4) the 1993 Application Supplement.

Water utilization and discharges at the Station are illustrated in

Figure 5 (and accompanying notes) on pages 28-29 of the Fact

Sheet/Basis.

DSNs 481 - 486

1) Circulating Water System

As discussed in the Fact Sheet to this Draft Permit, water withdrawn

©0

....... - , _ ------ ---------.. .

Page 3.8 of 152 PagesFact Sheet/Basis

NJ00056229from the River passes through the condensers for non-contact cooling

of the secondary steam loop and is discharged back to the River.

(See Figure 5. on page 28 of the Fact Sheet/Basis) The discharge flow

from DSNs 481-486 is composed primarily of wastewater from the once-

through condenser cooling water. DSNs 481-486 also include flow from

the servi.ce water system, with limited contribution from.the

radioactive licuid waste-and non-radioactive liquid waste systems.

2) Service Water System

The service water system ("SWS") provides cooling to smaller,

critical heat exchangers throughout the Station. The SWS is a

nuclear safety-related system and the discharge is classified as a

low volume waste stream pursuant to 40 CFR 423. Past history has

demonstrated that macroinvertebrate fouling does occur in the system.

The SWS is designed -to allow the addition of sodium hypochlorite at

the pump suction bay and/or discretely to each distribution header to

control macroinvertebrate fouling.. Total residual chlorine ("TRC")

is limited in the permit. PSE&G's 1990 Permit Application states

that the SWS has no feasible path for the addition of any other

pollutant (other than sodium hyppchlorite) and there are no means of

monitoring the discharge before it joins with the CWS outfalls.

3) Monitor Tank Effluent

Moniizor tank effluent, which is effluent of the radioactive liquid

0i

Page 39 of 152 PagesFact Sheet/BasisNJ0oo5622

waste ("RLW") system, discharges through CWS outfalls DSNs 481, 482,

484 and/or 485 (See Figure 5 on page 28 of the Fact Sheet/Basis).

The radioactive liquid waste system collects system leakage,

equipment leakage, decontamination liquids, washwaters, sample

wastes, and flow from floor drains, system drains, ventilation system

drains, and laboratory drains from areas of the Station that contain,

or may contain, radioactive materials. These wastestreams may

contain trace quantities of organics, analytical laboratory

chemicals, decontamination solutions, or cleaning solutions. The

primary chemicals that are used and could drain to the radioactive

liquid waste system include chromates, hydrazine, and boron. These

wastestreams are collected in tanks; processed to reduce

radioactivity; treated with hydrogen peroxide to remove hydrazine or

demineralized to remove ionic impurities, as necessary; sampled for

radioactive concentrations; and, discharged in a batch mode through

the CWS outfalls noted above. The radioactive concentrations,

quantities, and rate of the discharge are regulated and limited by

the USNRC.

4) Non-Radioactive Liquid Waste Disposal System

The influents to the "Non-Radioactive. Liquid Waste Disposal System"

("NRLWDS") are annotated in the system schematic depicted in Figure 6

on page 30 of the Fact Sheet/Basis with a letter designator and

include:

Page 40 of 152 PagesFact Sheet/Basis

O\ . ~NJ0005622 ,

a. Regenerant wastes from demineralizers utilized for producing.

ultrapure water at Salem and at the Permittee's adjacent

facility, Hope Creek Generating Station, are routed to the

NRLWDS. These wastestreams contain dilute acid and caustic

regenerants, as. well as impurities removed from site well

water.

b. Chemical unloading area drains, chemical feed tank drains and

floor drains, and the demineralizer area sump, as well as the

acid and caustic chemical unloading -area drains and the

ammonia filling connection drains are routed to the NRLWDS.

The chemical unloading area drains can contain residuals from

leakage or spillage during acid or caustic tank truck

transfers and, also, precipitation- The chemical feed tanks

are utilized for handling and adding feedwater treatment

chemicals, primarily ammonium hydroxide'and hydrazine. The

tank drains, tank overflows, and area floor drains may contain

residual treatment chemicals or washwater containing dilute

cleaning agents. The demineralizer sump collects spillage,

leakage, overflows, floor drains, SWS sampling and leakage,

analytical laboratory drains for the demineralizer plant, and

tank drainage from the acid and caustic storage area. The

floor drains could also contain small amounts of cleaning

solutions and. lubricants.

Page 41 of 152 PagesFact Sheet/BasisNJ0005622

- c. Secondary 'analytical laboratory drains and in-line

instruments that measure the purity of the process water in

the feedwater cycle also drain to the NRLWDS. This small

volume wastestream is primarily pure water with analytical

reagents and treatment chemicals..

d. Steam generator blowdown is an influent to the NRLWDS. The

influent flow is minimal: 10 to 12 gpm. During major outage

activities, steam generators can also be drained to the

NRLWDS. Steam generator blowdown and drainage contain

anmonia, hydrazine (most of which is converted to ammonia at

normal steam generator operating temperature), and trace

minerals and metals.

e. System recycle water and discharge from the NRLWDS vents,

drains, analytical laboratory drains, and floor drains are

returned to the NRLWDS. This influent is essentially NRLWDS

wastewater and may contain the same constituents as the other

influents to the NRLWDS as well as NRLWDS treatment chemicals.

f. Regenerant wastes from the condensate polishers are routed to

the NRLWDS. The condensate polishers remove impurities from

the steam cycle condensate water by demineralization. Because

these polishers are regenerated using dilute acid and caustic,

the regenerant wastes can contain dilute acid and caustic,

I

.Page 42 of 152 PagesFact Sheet/Basis

. NJ0005622

impurities removed by demineralization, and treatment

chemicals (ammonia and residual hydrazine).

Figure 6 on page 30 of the Fact Sheet/Basis depicts the flow and

treatment capabilities of the NRLWDS.

Influents. to the NRLWDS are collected in the equalization mixing

basin where some seIf-neutralization of the dilute acid and caustic

wastes occurs. If necessary, the wastestream may be treated with

sodium hypochlorite or hydrogen peroxide to reduce the concentrations

of ammonia and hydrazine. The wastestream then is normally routed

through the #2 clarifier,, the mix tank, the #1 clarifier,.and is

0> discharged through DSN -48C (an internal monitoring point) where it

mixes with. cooling water discharged through any ot all of DSNs 481,

•482, 484, and 485. Either or both clarifiers can be bypassed,

depending on wastestream quality. The mix tank normally is used for

the addition of caustic to facilitate precipitation of metals and the

capability has been installed, although it is not normally used, for

the addition of a coagulant aid. The mixed media filter skid is

installed but not normally used.

DSNs 487 and 489

For DSN 487., the components of the influent flows consist of river

water influx, precipitation runoff, roof drains, floor drains, sump

- pumps, No. 2 flood pump, and the effluent from the No. 3 skimmer tank

Page 43 of 152 PagesFact Sheet/BasisNJ0005622 e6

(DSN 487B). For DSN 489, the components of the influent flows

consist of river water influx, precipitation runoff, roof drains,

floor drains, sumrp pumps, and the effluent from the No. 1 skimmer

tank (DSN 489A), and No. 2 skimmer tank (DSN 489B). These outfalls

are subject to tidal influences such that monitoring at these

outfalls does not produce representative samples. As a result,

pollutan: contribution is currently measured on a "net" bas.is. The

wastewater flows to these outfalls are. depicted in Figure 7 and

Figure 8 on pages 31 and 32 of the Fact Sheet/Basis respectively.

DSN 487B

" Influents include precipitation runoff and roof drains, along with.

minor intermittent flows from floor and equipment drains, and

auxiliary boiler blowdown. Lubricants, chemicals,-and cleaning

solutions are used in limited quantities in the areas served by the

equipment and floor drains. However, these pollutants are not

.,expected to be measurable in the discharge. Auxiliary boiler

blowdown may contain ammonia and hydrazine as these compounds are

used for corrosion control. Figure 9 on page 33 of the Fact

Sheet/Basis depicts the essential influents to the #3 Oil Water'

Skimmer which discharges through DSN 487B.

I Page 44 of 152 PagesFact Sheet/BasisNJ0005622

DSNs 489A and 489B

Wastewater flows to these outfalls are routed through the #1 (DSN

489A) and #2 (DSN 489B) Oil Water Skimmers. Influents to these

systems include precipitation runoff, roof drains., floor drains,

equipment drains, and transformer sump drains. Equipment drains,

floor drains, and sumps drain areas in which limited pollutants are

utilized but are not expected to contain any measurable quantities of

pollutants other than those identified in. PSE&G's renewal

application. The chemical handling and storage areas in the facility

normally drain to the chemical waste system.that discharges to the

NRLWDS (DSN 48C). System leakage from components and equipment

containing very dilute quantities of acid, caustic, ammonia, and

hydrazine can, however, reach the turbine building sumps and be

discharged through these outfalls. Figure l0.on page 34 of the Fact

Sheet/Basis describes the influents to the #i and #2 Oil Water

Skimmers.

DSN 488

Influents to this outfall consist. of flows from precipitation runoff,

roof drains, floor drains, sump pumps, the #1 turbine building flood

pump, service water sump pumps, CWS vents, residual chlorine

analytical wastewater, service water strainer backwash, and river

water inf 1ux. The primary contributor to the effluent flow is river

D

Page 45 off 152 PagesFact Sheet/Basis

NJO005622

( > water influx. Figure 11 on page 35 of the Fact Sheet/Basis depictsthe influents to this outfall.

Although most pollutants are not expected to be present in the

discharge, pollutants used in the area drained through this outfall

could enter this system-during normal operations. Sump pumps and

floor drai.S, which drain areas in which certain pollutants are

utilized, ate not expected to contain any measurable quantities of

pollutants other than those identified in PSE&G's 1990 Permit

Applicaticn. The #1 flood pump is used for flooding emergencies and

is periodically operated for testing. This discharge could contain

any. of the materials used in the tuirbine building. The CWS vents

provide pressure and vacuum relief for this system after the main

condensers and prior to the point at which CWS wastewaters mix with

other wastestreams.

The service water strainers, are designed to remove small particles

from the intake water to prevent clogging and damage to the SWS heat

exchangers. The strainers are backwashed with service water to

remove the collected solids and the backwash water is discharged

through this outfall. Any leakage or drainage within the building

containing the service water pumps, screens, strainers, and

associated equipment is directed to building sumps that are

discharged through this outfall. Because sodium hypochlorite may be

added at the suction side of the service water pumps, residual

chlorine may be present in these discharges in small quantities.

Pae 46 of 152P. a• • g sFact Sheet/BasisNJOOO5622

DSNs 490 and 491

Discharges through these outfalls, consist solely of precipitation

runoff from areas of the property not associated with any industrial

process areas. DSN 490 discharges precipitation runoff from the

helicopter landing pad area. DSN 491, the East Yard Drain,

discharges precipitation.runoff from the employeeparking lot and an

adjacent access road. Figure 12 on page 36 of the Fact Sheet/Basis

depicts influent flows to DSN 491.

II. DESCRIPTION OF LIMITATIONS AND CONDITIONS

* Introduction

The 1990 Draft Permit contained a number of new or. revised

limitations and conditions for wastewater constituents other than

thermal effluent limitations. Many of those new or revised'limitations were predicated-on NJDEPE's proposal to require PSE&G to

retrofit the Station with a closed cycle cooling, system. -As noted

above in the Fact Sheet and as discussed in greater detail below in

this Statement of Basis,, this Draft Permit is being issued with

limitations and conditions which are consistent with the continued

operation of the Station with a once-through cooling water system.

''1

Page 47 of 152 PagesFact Sheet/BasisNJO005622

As a result, the Department is revising certain non-thermal

wastewater parameters at DSNs 481-486, the circulating water system

discharge. For'instance, because the once-through cooling system

will be retained, it is no longer appropriate to impose limitations

for priority pollutants and other parameters based on the USEPA

guidelines for cooling tower blowdown.

Also, in response to additional information supplied by PSE&G in the

1991 Comments (See Volume .62) and the 1993 Application Supplement,

the Department is also revising the effluent limitation and

conditions applicable to other outfalls,' as discussed below. PSE&G

will be required, however, to perform an Effluent Characterization.

Study to ascertain whether any further limits are justified beyond

those proposed in this Draft Permit.

This Draft Permit also proposes technical corrections for organic

oxygen-demanding constituents and ammonia for those outfalls where

these limits are applied. For organic oxygen-demanding parameters,

the Draft Permit proposes to limit total organic carbon 'TOC), in

lieu of the present limit on chemical oxygen demand (COD). This

change is consistent with N.J.A.C. 7:9-5.5 and N.J.A.C. 7:9-5.8,

which allow the Department to set a limit on either TOC or COD,

depending on the presence of other characteristics in the wastewater,

such as chlorides, that may interfere with the analysis. For

ammonia, this Draft Permit proposes to specify that the limit applies

to amimcnia as nitrogen (N)', consistent with the Delaware River Basin

Page 48 of 152 Pages

Fact Sheet/Basis

NJ0005622

Commission's ("'DRBC") Administrative Manual -Part III, Water Quality

Regulations May 22, 1991, as amended ("DRBC Water Quality

Regulations")

Also, the Department is making limited changes to the permit

requirements applicable to DSNs 487B, and 489A and 489B. Those

changes are necessary to *ensure consistency with the (1) re-routing

of the effluent from DSN 487B to the influent of the NRLWDS (no later

than December 31, 1993) and (2) installation of an oil water

separator at outfall DSN 489 (no later than April 30, 1994), thereby.

eliminating the river water influx at Outfall DSN 489 that caused the

Department to impose monitoring requirements at internal DSNs 489A

and 489B in the 1989 permit modification. All effluent limitations

and special conditions pertaining to the sanitary wastewater

treatment plant, formerly designated as DSN 487A, have been deleted

from the permit because that treatment plant was closed on April 6,

1990 in accordance with a NJDEPE-approved closure plan. All sanitary

wastew4ater has been routed to the Hope Creek treatment plant as of

January 1989.

This Draft Permit also includes additional and Special Conditions

sections which set forth conditions. deemed necessary to satisfy the

intent of the Clean Water Act, the New Jersey Water Pollution Control

Act (N.J.S.A. 58:10A-1 et seq.), the regulations promulgated pursuant

thereto, including 40 CFR Part 423, the NJPDES Regulations (N.J.A.C.

7:14A- 1. et sea. and applicable interstate regulations.

~*1

Page 49 of 152 PagesPact Sheet/Basis

NJ0005622

As an additional condition, the Draft Permit requires the Permittee

to perform an Effluent Characterization Study to collect and provide

to the NJDEE comprehensive data on the extent of compliance of the

Station's discharges with instream water quality standards for other

non-thermal water quality parameters. Upon review of these data, the

Department will determine whether WQBELs or additional modified

permit conditions are necessary.

Finally, the Department is proposing to revise some of the standard

permit terms and conditions to ensure consistency with the

Department's most recent regulations and permits.

OUTFALLS

A. DSNs 481 - 486

1. Background

The Station's once-through, non-contact condenser cooling water is

discharged through six submerged pipes or outfalls designated as DSNs

481-486. DSNs 481-486 discharge wastewater which is composed

primarily of non-contact once-through cooling water from the River

which is used to cool steam exhausted from the turbines. The non-

contact once-through condenser cooling water is returned to-the River

without the addition of any treatment chemicals. Provisions are,

- I

Page 50 fo1-152 Pages,

Fact Sheet/BasisNJ0005622

however, retained for the addition of sodium hypochlorite to control

biofouling, upon prior notification to the Department. Limited

contributions to the discharges from DSN 481-486 include wastewater

from the SWS., radioactive liquid waste system. and non-radioactive

liquid waste system. A summary description of these limited volume

wastewater streams are as follows:

a. Service Water System

The SWS., a nuclear safety related sys'tem, uses River water to cool

small, critical heat exchangers throughout the plant. Past history

has demonstrated that macroinvertebrate fouling does occur in the'

system and, as such, sodium. hypochlorite is added at the pump suction

bay and/or discretely to each distribution header to control

macroinvertebrate fouling. Total residual chlorine ("TRC") is

limited in the Draft Permit at DSNs 481 through 486 since there is no

means of obtaining a representative sample -of the discharge before it

joins with the CWS outfalls. The sodium hypochlorite addition system

is designed to maintain 0.3 mg/l to 0.5 mg/l residual in the effluent

of the SWS.

b. Monitor Tank Effluent (Radioactive Liquid Waste)

Monitor tank effluent is comprised of the wastewater from the

radioactive liquid waste system. The monitor tank effluent volume is

measured for each batch discharged and averages approximately 0.017

Page 51 of 152 PagesFact Sheet/BasisNJ0005622

MGD. This wastewater mixes with the non-contact condenser cooling

water-and is discharged through DSNs 4.81, 482, 484, and/or 485. The

radioactive liquid waste discharges are regulated and permitted by

the USNRC as concerns to radioactive concentrations, quantities and

rates.

c. Non-Radioactive Liquid Waste Disposal System (NRLWDS)

Wastewater from the NRLWDS is monitored at an internal monitoring

point (DSN 48C) after treatment. The non-radioactive liquid waste

flow from DSN 48C to DSNs 481, 482, 484 and/or 485 averages

approximately 0.26 MGD and is mixed with the non-contact cooling

water from the circulating water system prior to discharge to the

River through DSNs 481, 482, 484, and/or 485.

Figure 5 on page 28 of the Fact Sheet/Basis depicts the "Schematic of

Water Flow" at the Station. This figure demonstrates that the once-

through non-contact cooling water comprises the majority of the flow

through DSNs 481-4.86. In that once-through cooling water comprises.

the majority of the flow through DSNs 481-486, the Draft Permit

imposes limitations at these outfalls applicable to once-through

cooling water..

~Page-52 Jof_ 1_52 Pagesý-Fact Sheet/BasisNJ0005622

2. Effluent Limitations and Conditions

INFLUENT FLOW shall be limited to a monthly average of 3,024 million.

gallons per day (MGD) .total intake for outfalls DSNs 481-486. This

requirement is imposed as part of the Section 316(b) Demonstration

Special Conditions (see. below). Monitoring for influent flow is

required to be calculated on a daily basis. -Daily maximum and

monthly average effluent flow shall be reported daily.

Conditions for EFFLUENT FLOW are consistent with the existing permit

in accordance with the provisions set forth in N.J.A.C. 7:14A-

3.13(a) (12)i and are required pursuant to the NJPDES regulations and

fee calculation-requirements. Monitoring for effluent flow is

required to be calculated for each outfall on a daily basis. Daily

maximum and monthly average effluent flow in units of Million Gallons

per Day (MGD) shall be reported daily.

Conditions for INFLUENT TEMPERATURE are consistent with the existing

permit in accordance with the provisions set forth in N.J.A.C. 7.:14A-

3.13(a) (12)i. Facility A ("FAC A") designates the discharge from

Unit #1 (DSNs 481, 482, and 483). and Facility B ("FAC B") designates

the discharge from Unit #2 (DSNs 484,.:485, and 486). Continuous

.monitoring with daily maximum and monthly average reporting is

required for FAC A and FAC B. * .

(-

Page 53 of 152 PagesFact Sheet/BasisNJ0005622

Effluent limitations and conditions for EFFLUENT TEMPERATURE are

consistent with the existing permit in accordance with the provisions

set forth in N.J.A.C. 7:14A-3.13(a) (12)i. Effluent temperature shall

be monitored continuously and calculated as the flow-weighted average

for FAC A and FAC B. FACA. designates the discharge from Unit #1

(DSNs 481, 482, and 483) and FAC B designates the discharge from Unit

#2 (DSNs 484, 485, and 486). The monthly average shall be reported

for FAC A and FAC B. A daily maximum limitation of 46.1 * C (115'F)

from June 1 through September 30 and a daily maximum limitation of

43.3°C (110°F) from October 1 through May 31 has been imposed for FAC

A and FAC B.

Effluent limitations and conditions for DIFFERENTIAL TEMPERATURE are

consistent with the existing permit in accordance with the provisions@

set forth in N.J.A.C. 7:14A-3.13(a) (12)i. The flow-weighted

differential temperature shall be calculated daily. A daily maximum

limitation of 15.3cC (27.5°F) is imposed for both FAC A and FAC B. A

monthly average shall be reported for FAC A and FAC B. FAC A

designates the discharge from Unit #1 (DSNs 481, 482, and 483) and

FAC B designates the discharge from Unit #2 (DSNs 484, 485, and 486)

Effluent limitations and conditions for total FACILITY HEAT are

consistent with the existing permit in accordance with the provisions

set forth in N.J.A.C. 7:14A-3.13(a) (12)i.. Heat shall be calculated

daily as the product of heat capacity, discharge flow, and discharge-

intake tempnerature difference. A daily maximum limitation of 30,600

Page 54 of 152 PagesFact Sheet/BasisNJ0005622

Million British Thermal Units per Hour (MBTU/Hr) has been imposed for

FAC C. The monthly average shall be reported for Facility C .("FAC

C") FAC C designates the total discharge from DSNs 481, 482, 483,

484, 485., and 486.

TOTAL RESIDUAL CHLORINE (TRC) effluent limitations and conditions are

consistent with the existing permit in accordance with the provisions

set forth in N.J.A.C. 7:14A-3.13(a) (12)i. Since the addition of

sodium hypochlorite to the circulating water system has not been

routinely required, the permit conditions require the Permittee to

notify the Department prior to reinitiating the addition of sodium

hypochlorite to the circulating water system. As part of this

N) notification, the Permittee shall provide the Department with a

methodology for sodium hypochlorite addition which ensures that the

discharge of TRC is consistent with the steam effluent guidelines, 40

CFR 423. If chlorination is reinitiated tO the circulating water

system, TRC shall be monitored at the permitted outfalls, DSNs 481-

486, three times per week, each during a two (2) hour period of

chlorination. The amount of TRC discharged from* each permitted

outfall, DSNs 481-486, shall not exceed a daily maximum of 0.2 mg/l

during the chlorination of the circulating water system. If

chlorination is reinitiated, the Permittee shall maintain a log,

noting the time and duration of sodium hypochlorite addition to the

circulating water system.

Page 55 of 152 PagesFact Sheet/BasisNJ0005622

The Permittee, however, shallbe permitted to continue to discharge

TRC in excess of two hours per day as it was permitted in the 1989

permit. The Permittee shall monitor for TRC from the continuous

chlorination of the service water system three (3) times per week by

grab sample at each permitted outfall, DSN 481-486. TRC discharged

from each permitted outfall DSN, 481-486, shall not exceed a monthly

average of 0.3 mg/i or a daily maximum of 0.5 mg/l when circulating

water system non-contact cooling water is not being discharged

through the associated permitted outfalls, DSNs 481-486. At all

other times, the amount of TRC discharged from each permitted outfall

(DSNs 481-486) shall not exceed a daily maximum of 0.2 mg/1 and the

monthly average shall be reported.

TOTAL ORGANIC CARBON (TOC)., CHEMICAL OXYGEN DEMAND (COD), BIOCHEMICA

OXYGEN DEMAND (BOD5), and TOTAL SUSPENDED SOLIDS (TSS) were detected

and reported in the 1990 Permit Application. The 1990 Permit

Application indicates that these pollutants are also present in the

intake water. No limitations for these parameters are imposed at

this time. However, TOC and TSS shall be monitored in the influent

and effluent as part of the Effluent Characterization Study imposed

in Part IV-B/C of the permit to further evaluate the imposition of

limitations for these parameters. TSS and TOC are also limited at

DSN 48C.

Effluent limitations and conditions for pH are consistent with the

exiStina permit in accordance with the provisions set forth in

Page 56 of 152 PagesFact Sheet/BasisNJ0005622

N.J.A.C. 7:14A-3.13(a) (12)i. Monitoring of pH shall be perfor ed

three times per week using a grab sample. The daily minimum pli of

the effluent shall not be less than 6.0 Standard Units (S.U.) and the

daily. maximum pH shall not be greater than 9.0 S.U. The daily

minimum pH limitation shall.be the intake pH when then intake PH is

less than 6.0 S.U. The daily maximum pH limitation shall be the

intake pH when the intake pH is greater than 9.0 S.U.

AMMONIA was detected and reported in the 1990 Permit Application. The

1990 Permit Application indicates that detectable quantities oE this

pollutant are also present in the intake water. No limitations for

this parameter shall be imposed at.this time. However., Ammonia shall

be monitored in the influent and effluent, as well as at DSN 4RC, as

part of the Effluent Characterization Study imposed in Part IN-B/C of

the permit to further evaluate these parameters.

The existing permit contains a monitoring requirement and a ljit of

LC50 > 50% for ACUTE TOXICITY at DSN 48C. The effluent from IS 48C,

a low volume wastestream, conmningles with the non-contact cooling

water prior to discharge through outfalls DSNs 481, 482,. 484 ad/or

485. The acute toxicity data for DSN 48C indicates that this

discharge alone does not consistently cause toxicity above thdt

permit limitation. However, data from other PSE&G facilities.

indicates the presence of toxics in the non-contact cooling witer

outfalls, such as DSN 481, DSN 482, DSN-484 and.DSN 485, whictmay

not be the result of low volume wastestreams such as DSN 48C. These

Page 57 of 152 PagesFact Sheet/BasisNJ0005622

toxics either alone, or in combination, have the potential to cause

toxicity. Therefore, the Department has determined that monitoring

for toxicity in the discharge is more appropriate at the circulating

water system outfalls since additional sources of toxicity may be

present in these discharges.

The effluent limitations and conditions for acute toxicity testing

are consistent with the existing permit in accordance with the

provisions set forth in N.J.A.C. 7:14A-3.13(a) (12)i. The

representative monitoring point, howe"er, has been changed. The

Permittee shall be required to perform acute toxicity testing on each

circulating water system outfall(s) to which the effluent from DSN

48C is discharging during the sample event. The Permittee may align

the DSN 48C effluent to a single circulating water system outfall

during sample collection. In such event Permittee would perform only

one acute toxicity test during the required sampling event.

Permittee shall perform acute toxicity testing quarterly in

accordance with Part IV-B/C of the Draft Permit. A minimum

limitation of LC50 > 50% is imposed. This limitation is equivalent

to 2 TUa's (Acute Toxicity Units) maximum.

The "Acute Toxicity Biomonitoring Requirements" section of the Draft

Permit has been updated to reflect present standard language and

current Department mailing addresses.

Page 58 of 152 PagesFact Sheet/Basis

NJ0005622

N..J.A.C. 7:14A-3.13 states that each DSW permit shall include

conditions to satisfy the requirements of the Federal Clean Water

Act.. Pursuant to 40 CFR 122.44(d)'(1) water quality-based effluent

limitations must be imposed to "control pollutants '... discharged at

a level which will cause, have the reasonable potential to cause, or

contribute to an [exceedance] above any State water quality

standard..."

Pursuant to Part IV-B/C of this Draft Permit, the Permittee shall be

required to perform an Effluent Characterization Study, a Chronic

Toxicity Characterization Study and, if required, a Dilution Study at

the -discharge of non-contact cooling water outfalls 'in order to

determine the extent-which, if at all, the discharge is causing or

has the reasonable potential to cause an exceedance of a New Jersey

water quality standard. The acute toxicity limitation and conditions

will'be reevaluated based on the results of the Effluent

Characterization Study, Chronic Toxicity Characterization Study and

Dilution Study (if required)

BORON was detected and reported in the 1990 Permit Application. The

1990 Permit Application indicates that detectable quantities of this

pollutant are present in the intake water. No :limitations shall be

imposed at this time. However, Boron shall be monitored in the

influent and effluent as part of the Effluent Characterization Study

imposed in Part IV-B/C of the permit to further evaluate these

-P ara etes.

Page 59 of 152 PagesFact-Sheet/BasisNJ0005622

TOTAL COPPER was detected and reported in the 1990 Permit

Application. No limits or conditions shall be imposed at this time

since the 1990 Permit Application indicates that copper is also

present in the intake water. This parameter (measured as Total

Recoverable) will be monitored in the Effluent Characterization Study

in Part IV-B/C. of the permit and the requirement for effluent

limitations, and conditions shall be, reevaluated, after the Study is

completed.

B. DSN 48C

1. Background

The influent waste streams to the NRLWDS include the following:

a. regenerant wastes from demineralizers utilized for

producing ultrapure water at Salem and the Hope Creek

Generating Station;

b. chemical handling area drains, chemical feed tank drains

and area floor drains, and the demineralizer area sump,

as well as the acid and caustic chemical unloading area

drains and the ammonia filling connection drains;

0

Page 60 of 152 PagesFact Sheet/BasisNJ0005622

c. secondary analytical laboratory drains and in-line

instruments that measure the purity of the process water

in the feedwater cycle;

d. limited steam generator blowdown, and, during major

outages, steam generator drainage;

e. system recycle water and discharge from the NRLWDS vents,

drains, analytical laboratory drains, and floor drains;

and

f. regenerant wastes from the condensate polishers.

Figure 6 on page 30 of the Fact Sheet/Basis depicts the flow and

treatment capabiliti~es of the NRLWDSS.

The wastestreams to the NRLWDS may contain dilute acid and caustic

regenerants; residual treatment chemicals, including ammonium

hydroxide and hydrazine; river Water from sampling and leakage from

the service water system; analytical reagents from laboratory drains;

floor drain wastewater which may contain small amounts of cleaning

solutions and lubricants; and trace minerals and metals.

Influents to the NRLWDS are collected in an equalization mixing basin

where some self-neutralization of the dilute acid and caustic wastes

occurs. The wastestream may be treated with sodium hypochlorite or

Page 61 of 152 Pages.Fact Sheet/BasisNJ0005622 I0

hydrogen peroxide, if necessary, to reduce the concentrations of

ammonia and hydrazine. The amount of sodium hypochlorite or hydrogen

peroxide added is based on the concentration of ammonia to be treated

and the stoichiometric relationship. The wastestream is normally

routed through the #2 clarifier, the mix tank, the #1 clarifier, and

discharged through DSN 48C'where it mixes with the non-contact

cooling water di.scharged through any or all of DSNs 481, 482, 484,

and 485.

2. Effluent Limitations and Conditions

Conditions for FLOW are consistent with the existing permit in

accordance with the provisions set forth in N.J.A.C. 7:14A-

- 3.13(a) (12)i and are required pursuant to the NJPDES regulations an

fee calculation requirements. Flow shall be monitored and recorded

on a daily basis. Daily maximum and monthly average reporting in

units of Million Gallons per Day (MGD) shall, be required.

Effluent limitations and conditions for PETROLEUM HYDROCARBONS are

Jretained from the existing permit in accordance with the provisions

set forth in N.J.A.C. 7:14A-3.13(a) (12)i. As originally established,

the limitations for petroleum hydrocarbons were based on N.J.A.C.

7:14A-14.1, et seq., entitled "Oil and Grease Effluent Limitations."

The sample shall be collected as a grab sample. Monitoring frequency

shall be twice per month. The monthly average limitation of .0 mg/l

and the daily maximum limitation of 15 mg/l have been retained.

and

.,.Page 62 of 152 PagesFact Sheet/BasisNJ0005622

Effluent limitations and conditions are imposed on TOTAL ORGANIC

CARBON (TOC), in lieu of the existing limitation on CHEMICAL OXYGEN

DEMAND (COD), in accordance with the provisions set forth in N.J.A.C.

7:14A-3.13(a) (12)i. This technical change in the organic oxygen-

demanding parameter regulated is being made because TOC is a more

appropriate parameter for the NRLWDS wastestream. The limitation is

based on an assumed 2:1 ratio of COD:TOC, utilizing the existing COD

limitation of 100 mg/l. The samples shall be collected as composite

samples. Monitoring shall be conducted twice per month. A daily

maximum limitation of 50 mg/l is imposed. Reporting of a monthly

average shall also be required.

BIOCHEMICAL OXYGEN DEMAND (BOD5) was detected and reported in the

1990 Permit Application. Since TOC effluent limitations and

conditions are imposed, no limitations or conditions for BOD5 shall

be imposed at this time.

Effluent limitations and conditions for TOTAL SUSPENDED SOLIDS (TSS)

are retained from the existing permit in accordance with the

provisions set forth in N.J.A.C. 7:14A-3.13(a) (12)i. DSN 48C is a

low volume waste source pursuant to 40 CFR Part 423 and the

limitations are consistent with that section. Samples shall be

collected as composite samples and monitoring shall be conducted,

twice per month. The limitations imposed are a.monthly average of 30

Page 63 of 152 PagesFact Sheet/BasisNJ0005622 -

mg/l, a daily maximum of 10.0 mg/l, and a seven-day average of .45

m¢/l-

Effluent limitations and conditions for pH are retained from the

existing permit in accordance with the provisions set forth in

N.J.A.C. 7:l4A-3.13(a)(!.2)i. USEPA regulations and guidance,

including the combined wastestream rule at 40 CFR Section

423.12(b) (12), allow mixing a low volume wastestream such as DSN 48C

with cooling water effluents in order to utilize the natural

buffering capacity of the cooling water, as long as the final

discharge at the cooling water outfalls (DSNs 481, 482, 484, and 485)

complies with the pH limitation. The samples shall be collected as

grab samples. The pH shall not be less than 6.0 standard units nor.

greater than 9.0 standard units as monitored and reported for the

respective outfall of DSN 481, 482, 484, and/or 485. pH is not

required to be monitored for DSN 48C.

Effluent limitations and conditions for AMMONIA are retained from the

existing permit in accordance with the provisions set forth in

N.J.A.C. 7:14A-3.13(a) (12)i. A monthly average limitation of 35 mg/1

and a daily maximum limitation of 70 mg/l has been imposed.

Monitoring shall be performed twice per month. The form of ammonia

regulated has been changed from ammonia as NH 4 to ammonia as N,

consistent with DRBC's Water Quality Regulations applicable to Zone 5

of the Delaware River. In addition, the "sample type" specified in

0

A

Page 64 of 152 Pages

- Fact Sheet/Basis

NJ0005622

the permit has been changed from a "grab" to a "composite" t

for a more representative sample.

o provide

ON

All limitations and conditions on ACUTE TOXICITY are deleted from

this outfall and imposed at the discharge of the circulating water

system outfalls in order. to evaluate the combined effects of the non-

contact cooling water and DSN 48C, the low volume wastestream. 'This

change is made due to presence of toxics in non-contact cooling water

discharges at other PSE&G facilities.

HEXAVALENT CHROMIUM was reported on.the Discharge Monitoring Reports

(DMR) through March, 1989. The monitoring requirements and

limitations were deleted by the 1989 permit modification. The DMR

data indicates hexavalent chromium was detected at trace amounts. in

the effluent. Effluent limitations and conditions have not been

imposed at this time. Total chromium shall be monitored in the

Effluent Characterization Study and the requirement'for a limit shall

be reevaluated at the completion of the study.

TOTAL. COPPER and TOTAL IRON data were submitted on the DMR.through

March, 1989 and in the 1990 Permit Application. No effluent

limitations or conditions have been imposed in this Draft Permit.. The

data indicates these metals were detected at low levels in this

effluent. These parameters (measured as Total Recoverable.) shall be

monitored in the Effluent Characterization Study in Part IV-B/C of

. . .... .*. .----.. . . .

Page 65 of 152 PagesFact .Sheet/BasisNJ0005622

the permit, and the requirement for limitations shall be reevaluated

after the completion of that study.

TOTAL LEAD and TOTAL NICKEL analytical data were submitted in the

1990 Permit Application. The data indicate these metals were.

detected at trace levels in the effluent. Effluent limitations and

conditions are not imposed'at this time. These parameters (measured

as Total Recoverable) shall be monitored in the Effluent

Characterization Study in Part IV-B/C of the permit and this

requirement for limitations shall be.reevaluated after completion of

that stud,'v.

Effluent limitations and conditions for NITRATE-NITRITE have not been.

imposed at this time as the Permittee's 1990 Permit Application data

indicates that this compound was detected at only trace levels.

Effluent limitations and conditions for TOTAL PHENOLS have not been

imposed at this time as the Permittee's 1990 Permit-Application data

indicates that this compound'was detected at only trace levels..

Phenol shall be monitored in the Effluent Characterization Study in

Part IV-B/C of the permit and the requirement for a limit shall be

reevaluated after completion of that Study.

Effluent limitations and conditions for PHOSPHORUS and SULFATE are

not imposed at this time as these compounds were detected, at levels

I.0

Page 66 of 152 PagesFact Sheet/BasisNJ0005622

which are not considered to be significant for the discharge to,

saline waters based on the Permittee's 1990 Permit Application data.

Effluent limitations and conditions for SULFIDE and TOTAL ORGANIC

NITROGEN are not imposed at this time as these compounds were

detected at trace levels based on the Permittee's 1990 Permit

Application data.

Data on ZINC was submitted on the Discharge Monitoring Reports (DMRs)

through March 1989 and also in the 1990 Permit Application. The data

indicates this metal was detected at low levels in this effluent. No

limitation shall be imposed at this time. However, this parameter

shall be monitored as part of the Effluent Characterization Study in

S...Part IV-B/C of the permit. Upon receipt of the Effluent

Characterization Study report, the Department may reevaluate the

imposition of limitations/conditions on this parameter.

C. DSN 487

1. Background

The wastewater flows to this outfall include river water influx,

precipitation runoff, roof drains, floor drains, sump pumps, the No.

2 flood pump, and the effluent from the No. 3 skimmer tank,

monitoring point DSN 4873. Monitoring at this outfall does not

produce re•resentative samples as this, outfall is subject to tidal

Page 67 of 152 Pages.. Fact Sheet/Basis

NJ0005622

influences. Pollutant contribution is measured on a "net" basis in

the existing permit. Figure 7 on page 31 of the Fact Sheet/Basis

depicts the wastewater flows to DSN 487.

DSN 487A, the former sanitary wastewater treatment plant discharge,

has been deleted from the permit. The treatment plant was closed in

accordance with a NJDEPE-approved closure plan and, in January 1989,

Salem's sanitary wastewater was routed to the Hope Creek treatment

plant.> DSN 487B will be rerouted to the NRLWDS influent for

treatment, and except for emergency .o•erflows, will not discharge

through DSN 487 after December 31, 1993.

2. Effluent Limitations and Conditions

The analytical data provided in the 1990 Permit Application for DSN

487 is essentially representative of the river. All limitations and

conditions are deleted from this outfall because samples obtained at

the specified monitoring point are largely subject to tidal

influences where monitoring may be inappropriate. The majority of

the potentially contaminated water is currently being monitored at

internal point 487B and as such, the Permittee's pollutant

contributions are adequately assessed.. This discharge shall no

longer be a monitored outfall.

N

Page 68 of 152 PagesFact. Sheet/Basis

LQN NJ0005622

D. DSN 487B

1. Background

The influents to the No. 3 Oil Water Skimmer, which discharges

through DSN 487B to DSN 487, include precipitation• runoff, roof

drains, minor intermittent flows from floor and equipment drains, and

auxiliary boiler blowdown. Auxiliary boiler blowdown may contain

ammonia and hydrazine as these compounds are used for corrosion

control. Figure 9 on page 33 of the Fact Sheet/Basis depicts the

influents to the #3 Oil Water Skimmer.

As noted above., Permittee shall be required to re-route• the

wastewater from the No. 3 Oil Water Skimmer to the NRLWDS which will

provide additional treatment. The reroute shall be performed in

accordance with the compliance schedule provided in Part IV-B/C of

this permit. The outfall will remain a monitored outfall with

effluent limitations and conditions that will apply until the reroute

iscomplete and, subsequent thereto, if an emergency discharge from

DSN 487B occurs. However, since discharge is expected only on an

overflow basis, monitoring shall be only once per discharge instead

of monthly for all parameters.

4)

Page 69 of 152 PagesFact Sheet/BasisNJ0005622

2. Effluent Limitations and Conditions

Conditicns for'rlware consistent with the existing permit in

accordance with the provisions set forth in N.J.A.C. 7:14A-

3.13(a) (12)i. and are required pursuant to the NJPDES regulations and

fee calculation requirerments. The Permittee shall be required to

calculate flow for this outfall on a monthly basis (once per

discharge beginning January 1, 1994). The daily maximum and monthly

average values shall be reported in units of Million Gallons per Day

(MGD) . Flow is calculated based on. the non-precipitation related

estimate- discharge plus the calculated precipitation related

discharge.

Effluent limitations and conditions for EFFLUENT TEMPERATURE are

retained fr=z the existing permit in accordance with the provisions

set forth in N.J.A.C. 7:l14A-3.13(a) (12)i. Samples shall be collected

monthly (once per discharge beginning January 1, 1994) as grab

samples. The daily maximum and monthly average temperatures shall be

reported. A daily maximum effluent temperature limitation of 43.3'C

has been imposed. This limitation is consistent with the DRBC's

Interpretative Guideline No. 1, Resolution No. 72-1. (DRBC Water

Quality Guidelines).

Effluent limitations and conditions for PETROLEUM HYDROCARBONS are

retained from the existing permit in accordance with the provisions

set fcrth in N.J.A.C. 7:14A-3.13(a) (12)i. Samples will be collected

Page 70 of 152 PagesFact Sheet/BasisNJ0005622

as grab samples. Permittee shall monitor once per month (once per

discharge beginning January ., 1994). The monthly average limitation

is 10 mg/i and the daily maximum limitation is 15 mg/i (beginning

January 1, 1993, only the daily maximum limitation is imposed, but

monthly average reporting is still required).

Effluent limitations and conditions are imposed onTOTAL ORGANIC

CARBON (TOC),. in lieu of the limitation on CHEMICAL OXYGEN DEMAND

(COD) in the existing permit, in accordance with the provisions set

forth in N.J.A.C. 7:14A-3.13(a) (12)i.. The Department is applying TOC

as the organic oxygen-demanding parameter regulated in that TOC is a

more appropriate parameter for this wastestream. The limitation is

based on an assumed 2:1 ratio of COD:TOC, utilizing the existing COD

limitation of 100 mg/l.. Samples shall be collected as grab-samples.

Monitoring is required monthly (once per discharge beginning January

1, 1994). A daily maximum limitation of 50 mg/l.shall be imposed.

Reporting of the monthly average shall also be required.

BIOCHEMICAL OXYGEN DEMAND (BOD5) Was detected and reported in the

1990 Permit Application. Since TOC effluent limitations and

conditions are imposed, no limitations or conditions for BODS shall

be imposed at thistime.

Effluent limitations and conditions for TOTAL SUSPENDED SOLIDS are

retained from the existing permit in accordancewith the provisions

set forth in N.J.A.C. 7:14A-3.13 (a) (12)i. Samples will be collected

-- ..... ...... - ....... ----- ------L_ _ • • ••= i = : = _ _ •= •l i .... .. _L • _ ... ..... •..... .... _ • i o i ... . .. . .. . . _J - , = i • • _ _

Page 71 of 152 PagesFact Sheet/Basis

.NJ0005622

) as grab samples. Monitoring is required monthly (once per discharge

beginning January 1, 1994) and the limitations imposed shall be a

monthly average of 30 mg/l, a daily maximum of 100 mg/l, and a seven-

day average of 45 mg/l, with reporting of each. Beginning January l,

.1994, only the daily maximum limitation shall be imposed -due to the

intermittent nature of the discharge. However, monthly average

reportingr s still required.

Effluent limitations and conditions for pH are retained from the

existing permit in accordance with the provisions set forth in

N.J.A.C. 7:14A-3.13(a) (12)i. The pH shall not be less than 6.0

standard units nor greater than 9.0 standard units. Samples will be

collected as grab samples on a monthly basis (once per discharge

beginning January l, 1994).

AMMONIA was detected and reported in the 1990 Permit Application. No

limitations and conditions have been imposed on this parameter at

this time. However, Ammonia shall be monitored at DSN 48C as part

of the Effluent Characterization Study in Part IV-B/C of the permit.

TOTAL CADMIUM was detected and reported in the 1990 Permit

Application. No limitations and conditions have been imposed on this

parameter at this time. However, Total Recoverable Cadmium shall be

monitored at DSN 48C as part of the Effluent Characterization Study

in Part IV-B/C of the permit.

Fact Sheet/Basis

NJ0005622

*" TOTAL COPPER was detected and reported in the 1990 Permit

Application. No limitations and conditions have, been imposed on this

parameter at this time. However, Total Recoverable Copper shall be

monitored at DSN 48C as part of the Effluent Characterization Study

in Part IV-B/C of the permit.

TOTAL PHENOLS was detected and reported in one sample in the 1990

Permit Application. A January 10, 1991 application supplement

provided data collected at three additional sampling.events which

demonstrated no detectable total phenols. No limitations and

conditions have been imposed on this parameter at this time.

However, Total Phenols.shall be monitored at DSN 48C as part of the

Effluent Characterization Study in Part IV-B/C of the permit.

After December 31, 1993, all monthly monitoring shall be required to

be monitored once per discharge, to reflect the intermittent nature

of the discharge, events from this outfall. After December 31, 1993,

discharge shall only occur on and emergency overflow basis.

E. DSN 489

1. Background

The wastewater flows to this outfall consist of river water influx,

{ •precipitation runoff, roof drains, floor drains, sump pumps, and the

Page 73 of 152 PagesFact Sheet/Basis

- NJ0005622

effluent from the No. 1 skimmer tank, (DSN 489A) and No. 2 skimmer

tank (DSN 489B). Monitoring at this outfall does not, produce

representative samples as this outfall is subject to tidal influence.

The Permittee has committed to install an oil water separator system

at DSN 489 in its 1993 Application Supplement. The 1993 Application

Supplement indicates that the discharge from the oil water separator

system wil.L. be pumped, thereby eliminating the tidal influence and

allowing the collection of samples representative of the Permittee's

discharge at this DSN. Figure 8 on page 32 of the Fact Sheet/Basis

depicts the influents which discharge'through DSN 489.

2. Effluent Limitations and Conditions

a. No limitations or conditions are imposed for this outfal*

until April 30, 1994 or the date on which the oil/water

separator system becomes operational, whichever occurs

first. Limitations and conditions have not been imposed

at this time in that the sampling point is largely

subject to tidal influences and monitoring does not

produce representative samples and is, therefore,.-]

inappropriate. Inaddition, the majority of the

potentially contaminated water is monitored at internal

monitoring points DSN 489A and DSN 489B, thereby

providing an adequate assessment of Permittee's pollutant

contributions.

Page 74 Of 152 PagesFact Sheet/Basis

NJ0005622

b. The Permittee shall be required to install an oil/water

separator at DSN 489 to provide additional treatment for

stormwater and the effluents from DSNs 489A and 489B.

Beginning. May 1, 1994 or the date on which the oil water

separator system becomes operational, whichever occurs

first, DSNs 489A and 489B will no longer be monitoring

locations or outfalls and the effluent limitations and

conditions applicable to DSN 489 shall be as follows:

Conditions for FLOW will. be consistent with the existing permit

requirements for DSNs 489A and 489B. These conditions are consistent

with the provisions set forth in N.J.A.C. 7:.14A-3.13(a) (12)i and are

required pursuant to the NJPDES regulations and fee calculation

requirements. The Permittee shall be required to calculate flow on a

monthly basis using a flow totalizer or using the operating times of

the discharge pumps for this outfall. The daily maximum and monthly

average values shall be reported in units of Million Gallons per Day

(MGD).

Effluent limitations and conditions for PETROLEUM HYDROCARBONS are

retained from the existing permit at DSNs 489A and 489B and in

accordance with the provisions set forth in N.J.A.C. 7:14A--

3.13(a) (12)i. Samples will be collected as grab samples. The

Permittee shall monitor once per month. The monthly average

limitation is 10 mg/l and the daily maximum limitation is 15 mg/l.

Page 75 of 152.PagesFact Sheet/Basis

NJ0005622

Effluent limitations and conditions are imposed on TOTAL ORGANIC

CARBON (TOC), in lieu of the limitation on CHEMICAL OXYGEN DEMAND

(COD) on DSNs, 489A and 489B in the existing permit, in accordance

with the provisions set forth in N.J.A.C. 7:14A-3.13 (a) (12)i. The

Department is applying TOC as the organic oxygen-demanding parameter

regulated in that TOC is a more appropriate parameter for this

wastestream. The limitation is based on an assumed 2:1 ratio of

COD:TOC, utilizing the existing COD li'mitation of 100 mg/l. Samples

shall be collected as grab samples. Monitoring is required monthly.

A daily maximum limitation of 50 mg/lr shall be imposed. Reporting of

the monthly average shall also be required.

Effluent. lfii:itations and conditions for TOTAL SUSPENDED SOLIDS (TSS)

are retained from DSNs 489A and 489B in the existing permit in

accordanze with the provisions set forth in NJ.A.C. 7:14A-

3.13(a) (12)i. Samples will be collected as grab samples. Monitoring

is required monthly and.the limitations imposed shall be a monthly

average of 30 mg/l, a daily maximum of 100 mg/i, and a seven-day

average of 45 mg/l, with reporting of each.

Effluent limitations and conditions for pH are retained from DSNs

489A and 489B in the existing permit in accordance with the

provisions set forth in N.J.A.C. 7.:14A-3.l3(a)(12)i. The pH shall

not be less than 6.0 standard units nor greater than 9.0 standard

units. Samples will be collected as grab samples on a monthly basis.

Page 76 of 152 PagesFact Sheet/Basis

I. NJ 0005622

F. DSN 489A

1. Background

DSN 489A discharges wastewater from the #1 skim tank. The influents

to the skim tank include precipitation runoff, roof drainsi floor

drains, equipment drains, turbine building sumps, and transformer

sump drains. System leakage from components and equipment collected

by the turbine building sumps may contain lubricants and very dilute

quantities of acid, caustic, ammonia, and hydrazine. Figure 10 on

page 34 of the Fact Sheet/Basis depicts the influents to the #1 -skim

tank.

2. Effluent Limitations and Conditions

As noted above, the Permittee shall be required to install an oil

water separator at DSN 489 to provide additional treatment for the

effluent from DSN 489A. This oil water separator shall be installed

in accordance with the compliance schedule provided in Pert IV-B/C of

the Draft Permit.

Until April 30, 1994 or the date on which the oil water separator

system becomes operational, whichever occurs first, the effluent

limitations and conditions applicable to DSN 489A shall be as

follows:

Page 77 of 152 PagesFact Sheet/Basis

NJ0005622

Conditions for FLOW are consistent with the existing permit in

accordance with the provisions set forth in N.J.A.C. 7:14A-

3.13(a) (12)i and are required pursuant to the NJPDES regulations and

fee calculation requirements. The Permittee shall be required to

calculate flow for this outfall on a monthly basis. Daily maximum

and mont'lly average values shall be reported in MGD. Flow is

calculatet based on the non-precipitation related estimated discharge

plus the calculated precipitation related discharge.

Effluent limitations and conditions 'for PETROLEUM HYDROCARBONS are

retained fro- the existing permit in accordance with the provisions

set forth in N.J.A.C. 7:14-3.13(a) (12)i. Samples will be collected

as grab samples. The Permittee shall monitor once per month. The

monthly average limitation is 10 mg/l and the daily maximum

limitationý is 15 mg/l.

Effluent limitations and conditions are imposed on TOTAL ORGANIC

CARBON (TOC), in lieu of the limitation on CHEMICAL OXYGEN DEMAND

(COD) in the existing permit, in. accordance with the provisions set

forth in N.J.A.C. 7:14A-3.13(a) (12)i. The Department is applying TOC

as the organic oxygen-demanding parameter regulated in that TOC is a

more appropriate parameter for this wastestream. The. limitation is

based on an assumed 2:1 ratio of.COD:TOC, utilizing the existing COD

limitation of 100 mg/l. Samples shall be collected as grab samples.

Monitoring is required monthly. A daily maximum limitation of 50

0

Page 78 of 152 Pages

Fact Sheet/BasisNJ0005622

mg/l shall be imposed. Reporting of the monthly'average shall also.

be required.

BIOCHEMICAL OXYGEN DEMAND (BOD5) was. detected and reported in the

1990 Permit Application. Since TOC effluent limitations and

conditions are imposed, no limitations or conditions for BOD5 shall

be imposed at this time'.

Effluent limitations and conditions for TOTAL SUSPENDED SOLIDS (TSS)

are retained from the. existing permit in accordance with the

provisions set forth in N.J.A.C. 7:14A-3.13(a) (12)i. Samples will be

collected as grab samples.. Monitoring is required monthly and the

> .limitations imposed shall be a monthly average of 30 mg/l a daily

.... maximum of 100 mg/i, and a seven-day average of 45 mg/l, with

reporting of each.

Effluent limitations and conditions for pH are retained from the

existing permit in accordance with the provisions set forth in

N.J.A.C. 7:.14A-3.13(a) (12)i. The pH shall not be less than 6.0

standard units nor greater than 9.0 standard units. Samples will be

collected as grab samples on a monthly basis.

AMMONIA was detected and reported in the 1990 Permit Application. NO

limitations and conditions have been imposed on this parameter at

this time.. However, monitoring for Ammonia at DSN 489 (after

Page 79 of 152 PagesFact Sheet/Basis

NJ0005622

installation of the oil/water separator) is required as part of the

Effluent Characterization Study in Part IV-B/C of the permit.

Beginning May 1, 1994 or the date on which the oil water separator

system becomes operational, which ever occurs first, the effluent

limitaticons ar.d conditions at DSN 489A shall be deleted and DSN 489A

will no lcnger be a regulated outfall.

G. DSN 489B

1. Background

DSN 489B discharges wastewater from the #2 skim tank. The influents

to the skim tank include precipitation runoff, roof drains, floor 4

drains, equipment drains, turbine building. sumps, and transformer

sump drains. System leakage from components and equipment collected

by the turbine building sumps may contain lubricants and very dilute

quantities of acid, caustic, ammonia, and hydrazine. Figure 10 on

page 34 of the Fact Sheet/Basis depicts the influents to the #2 skim

tank.

2. Effluent Limitations and Conditions

The Permittee shall be required to install an oil water separator at

DSN 489 to provide additional treatment for the effluent from DSN

...... . . . " " -" - . . -.... ';-; - • •:•- - - .Z '. - --:Z !~:• •• .. ...... •--,.• .• _f. . . : ,

Page, 80 of 152 PagesFact Sheet/BasisNJ0005622

489B. This oil water separator shall be installed in accordance with

the compliance schedule provided in Part IV-B/C of this Draft Permit.

Until April 30, 1994 or the date on which the oil water separator

system becomes operational, whichever occurs first, the effluent.

limitations and conditions applicable to DSN 489B shall be as

follows:

Conditions for FLOW are consistent with the existing permit in

accordance with the provisions set forth in N.J.A.C. 7:14A-

3.13(a) (12)i and are required pursuant to the NJPDES regulations and

fee calculation requirements. The Permittee shall be required to

calculate flow for this outfall on a monthly basis and the daily

maximum and monthly average values shall be reported in MGD. Flow is

calculated based on the non-precipitation related estimated discharge

plus the calculated precipitation related discharge.

Effluent limitations and conditions for PETROLEUM HYDROCARBONS are

retained from the existing permit in accordance with the-provisions

set forth in N.J.A.C. 7':14A-3.13(a)(12)i. Samples will be collected

as grab 'samples. The Permittee shall monitor once per month. The

monthly average limitation is 10 mg/land the daily maximum

limitation is 15 mg/l.

Effluent limitations and conditions are-imposed-on TOTAL ORGANIC

CARBON (TOC), in lieu of the limitation on CHEMICAL OXYGEN DEMAND

Page 81 of 152 PagesFact Sheet/Basis

•NJO005622

(COD) in the existing permit, in accordance with the provisions setforth in N.'J.A.C. 7:14A-3.13(a) (12)i. The Department is applying TOO

as the organic oxygen-demanding parameter regulated in that TOC is a

more appropriate parameter for this wastestream. The limitation is

based on an assumed 2:1 ratio of COD:TOC, utilizing the existing COD

limitation of 100 mg/i. Samples shall be collected as grab samples.

Monitoring is required monthly. A daily maximum limitation of 50.

mg/l .shal1 be imposed. Reporting of the monthly average shall also

be required.

BIOCHEMICAL OXYGEN DEMAND (BOD5) was detected and reported in the

1990 Permit Application. Since TOC. effluent limitations and

conditions are imposed, no limitations or conditions for BODE shall

'_ be imposed at this time.

Effluent limitations and conditions for TOTAL SUSPENDED SOLIDS (TSS)

are carried over from the existing permit in.accordance with the

provisions set forth in N.J.A.C. 7:14A-3.13(a) (12)i. Samples will be

collected as grab samples. Monitoring is required monthiy and the

limitations imposed shall be a monthly average of 30 mg/l, a daily

maximum of 100 mg/l, and a seven-day average of 45 mg/l, with

reporting for each.

Effluent limitations and conditions for pH are carried over from the

existing permit in accordance with the anti-backsliding provisions

* set forth in N.J.A.C. 7:14A-3.13(a)(12)i. The pH shall not be less

0

Page 82 of 152 PagesFact Sheet/BasisNJ0005622

) than 6.0 standard units nor greater than 9.0 standard units. Samples

will be collected as grab samples on a monthly basis.

AMMONIA was detected and reported in the 1990 Permit Application. No

limitations and conditions have been 'imposed on this parameter at

this time. However, monitoring for*Ammonia at DSN 489 (after

installation of the oil/water separator) is required as part of the

Effluent Characterization Study in Part IV-B/C of the permit.

Beginning May 1, 1994 or the date on which the oil water separator

system beccnes operational, whichever occurs first, the effluent

limitations and conditions at DSN 489B shall be deleted and DSN 489B

will no longer be a regulated outfall.

H. DSN 488

1. Background

The' influents to this outfall consist of precipitation runoff, roof

drains, floor drains, sumnp pumps, the #1 turbine building flood pump,

service water sump pumps, service water strainer backwash, CWS vents,

and tidal influx. Sodium hypochlorite can be added at the suction

side of the service water pumps, and, as such, residual-chlorine may

be present in this discharge in small quantities. The primary

contributor to the effluent flow is the River water. As this outfall

is subject to tidal influence, monitoring at the outfall does not

I.

Page 83 of 152 Pages

Fact Sheet/Basis

NJ0005622

produce representative samples. Figure 11 on page 35 of the Fact

Sheet/Basils depicts the influents to DSN 488.

2. Effluent Limitations and Conditions

The analytical data provided in the 1990 Permit Application for DSN

488 is essentially representative of River water.. Effluent

limitations and monitoring requirements are not imposed for this

outfall in that this wastestream is primarily river water. For the

same reason, the existing permit as x4ell as the previous permit for

this facility did not contain limitations or monitoring requirements

at this outfall.

i. DSNs 490 and 491

1. Background

Discharges through these outfalls consist solely of precipitation

runoff fro- areas of the property not associated with any industrial

process. DSN 490 discharges precipitation runoff from the helicopter

landing pad area. DSN 491 discharges precipitation runoff from an

employee parking lot and an adjacent access road. Figure 12 on page

36 of the Fact Sheet/Basis depicts the influents to DSN 491.

r" _)

page 84 of 152 PagesFact Sheet/Basis

.NJO005622

2. Effluent Limitations and Conditions

Limitations and monitoring requirements have not been imposed for

these outfalls. Discharges from these outfalls consist solely of

stormwater run off from non-industrial process areas and, as such,

should nct ccntain substantLal quantities of pollutants. For the same

reason, the existing permit as well as the previous permit did not

contain limitations or monitoring requirements at these outfalls.

OTHER PERMIT REQUIREMENTS

A. Effluent Characterization Study

1. Introduction

The Permittee shall perform an Effluent Characterization Study of

specific discharges to determine whether the discharge of any

pollutant(s) has a reasonable potential to exceed New Jersey surface

water quality standards. The Permittee shall submit a report of the

Study to the Department. After a review of this report, and

consistent with State and Federal regulations (See generally, 40 CFR

Section 122.44 and N.J.A.C. Section 7:14A-1), the Department will

determine'whether Water Quality-Based Effiuent Limitations or

additional modified permit conditions are necessary.

Page 85 of 152 PagesFact Sheet/Basis

NJ0005622

2. Sampling Locations

a. Non-Contact Cooling Water (DSNs 481-486)

The outfalls discharging once-through non-contact cooling

water are identified as DSNs 481 through 486. DSNs 481, 482

and 483 are related to once-through non-contact cooling water

circulated through Unit #1 and DSNs 484, 485 and 486 are

related to once-through non-contact cooling water circulated

through Unit #2. The character of the discharge from these

o-`alls is similar. All six of the outfalls contain

primarily non-contact cooling water withdrawn from the River.

<' . DSNs 481, 482, 484, and 485 may also contain pollutants fro

low volume waste streams (i.e. NRLWDS and RLW) which are

commingled with the non-contact cooling water prior to

discharge (see discussion above). DSNs 483 and 486 contain

only non-contact cooling water. The Permittee shall be

required to monitor one outfall which is receiving low volume

waste streams at some time during monitoring and one outfall

which is receiving only non-contact cooling water.

The two outfalls to be monitored on the Circulating Water

System discharge will be on the same Unit to ensure that

representative samples are colle cted. The Permittee shall be

required to sample DSN 481 and DSN 483 (Unit #1 discharge).

------ ~----------.ava ilabie for monitoring (such as Unit outaue

Page 86 of 152 PagesFact Sheet/BasisNJO005622

j.

I.

or pump uniavailability), Permittee shall sample the Unit #2

discharge at DSN .484 and DSN 486. During sample collections

for the Effluent Characterization Study, the effluent from

DSN 48C shall be discharging only through DSN 481.if the

effluent from Unit #1 is being sampled, or only through DSN

484 if the effluent from Unit #2 is being sampled. If the

DSN 48C effluent is discharging through more than one

circulating system outfall during sampling for the Effluent.

Characterization Study, all circulating water outfalls for'

the Unit(s) to which DSN 48C effluent is discharging shall be

sampled. The RLW effluent for the respective Unit shall be

discharging through the outfall being monitored during

Effluent Characterization Study sampling, consistent with

USNRC discharge requirements.

Monitoring, of the non-contact cooling water discharge shall

be performed at the normal location for routine monitoring

for these outfalls.

The Permittee shall perform monitoring of the intake water in

that the discharge consists primarily of non-contact cooling

water withdrawn from the Rivet. The intake water will. be

monitored for the same parameters as the discharge. Samples

will be collected at a point in the circulating water system

after the intake water is mixed.but before the intake water

makes contact with the condenser tube sheets or tubes, such

Page 87 of 152 Pages*Fact Sheet/BasisNJ0005622

as the inlet water box of.the condenser. Intake monitoring

shall be conducted at the inlets associated with each outfall

being monitored. Since there are two intakes associated with

each. outfall, the Permittee shall sample both intakes for

each outfall monitored to obtain intake samples

representative of the outfall. The intake samples shall be

reported as a single value either by physically compositing

the two samples prior to analysis or by mathematically

averaging the analytical results of individual analyses on

concurrent samples.

b. Non-Radioactive Liquid Waste-Disposal System Discharge

)(DSN 48C) 4

The Non-Radioactive Liquid Waste Disposal System (NRLWDS)

discharge is a low volume waste stream and is monitored at

DSN 4.8C, an internal monitoring location. DSN 48C can

discharge through DSNs 481, 482, 484 and/or 485.

The Permittee shall be required to monitor the effluent waste

stream from DSN 48C at a point after the final clarifier, but

prior to the wastestream being commingled with non-contact

cooling water.

6>

Page 88 of 152 Pages

Fact Sheet/Basis

. NJoo'05622

c. oil Water Separator Discharge (DSN 489)

By April 30, 1994, the Permittee shall be required to have

installed an oil water separator at DSN 489 to treat the

effluent from #1 and #2 skim tanks which are currently

monitored as DSNs 469A and 489B. Once the oil water

separator becomes operational, DSNs 489A and 489B will cease

to be outfalls. Accordingly, DSN 48,9A and DSN 489B are not

included in the Effluent Characterization Study. Once the oil

water separator becomes operational, Permittee shall be

required to monitor the discharge from DSN 489.

At the time Effluent Characterization Study sampling is

conducted at DSN 489, Permittee shall be required to collect

samples at DSN 489 from either the discharge of the oil water

separator pumps or the effluent holding chamber of the oil

water separator.

d. Other Outfalls (DSNs 487,, 487B/ 488, 490 and 491)

The Permittee shall not be required to monitor DSNs 487, 488,

490 and 491 as part of the Effluent Characterization Study in

that monitoring requirements and effluent, limitations have

not been imposed in Part III-B/C of the Draft Permit for

these outfalls.

Page 89 of 152 PagesFact.Sheet/Basis

*NJ0005622

The Permittee shall be required to reroute DSN 487B, the

discharge of 03 skim tank, to the NRLWDS by December 31,

1993. Once the re-route in completed, the wastewater from #3

skim tank will only discharge from DSN 487B under emergency

conditions; As such, monitoring of the effluent from DSN

487B shall not be required as part of the Effluent

Characterization Study.

3. Parameters and Analyses

a. The Permittee shall be required to analyze samples

collected for the following categories of pollutants:

Conventional Pollutants

Non-conventional Pollutants

Appendix I Metals and Cyanide

Appendix I Volatiles

Appendix I Base/Neutrals

Appendix I Acid Extractables

The Permittee shall not be required to analyze for Appendix I

Pesticides as these pesticides are not used at the Station.

Permittee shall also not be required to analyze for Dioxin

(2,3,7,8-Tetrachlorodibenzo-P-Dioxin) and Polychlorinated

Biphenyl compounds as there is no reason to believe that

these pollutants will be present in the discharge.

.Page 90 of 152 PagesFact Sheet/BasisNJ0005622

The parameters comprising the categories of pollutants to be

analyzed as described above are listed in Appendix I of Part

IV-B/C of this Draft Permit and briefly discussed below.

b. Conventional Pollutants

The Permittee shall be required to sample for the following

conventional pollutants: Total Suspended Solids (TSS), Total

Organic Carbon (TOC), Petroleum Hydrocarbons (PHC), and pH.

The Permittee shall collect samples as grab samples for pH

and PHC and as composite samples for TSS and TOC. All

composite samples shall be time-proportional 24 hour

composites collected manually at least once per hour,

automatically by compositor, or by multiple grab samples of

batch discharges.

Analysis for TSS, TOC, and pH shall be conducted-pursuant to

the methods in 40 CFR 136, and analysis for PHC shall be the

method specified in N.J.A.C. 7:14A-14.

Permittee is required elsewhere in the permit-to monitor and

report for DSNs 481-486 and DSN 48C for following parameters:

'I . "

Page 91 of 152 PagesFact Sheet/Basis

NJ0005622

DSNs 481-486: pH

DSN 48C: pH, Petroleum Hydrocarbons,

Total Suspended Solids, and

Total Organic Carbon

,n addition, once the oil water separator becomes

operational, the P ermittee shall be required to monitor and

report at DSN 489 for pH, PHC, TSS and TOC. As such, the

Permittee will not be required to monitor for these

parameters at DSN 489'as part of this Study.

c. Non-conventional pollutants

The following pollutants were detected in the effluent and/or

have the potential to be discharged from the outfall and are

therefore required to be monitored under the Effluent

Characterization Study:

The Permittee shall monitor for Ammonia as N at outfall DSNs

481-6, 48C, and 489. The Permittee shall monitor for Boron

at outfall DSNs 481-6.

All composite samples shall be time-proportional 24 hour

composites collected manually at'least once per hour,

au:omatically by compositor, or by multiple grab samples of

batch discharges.

Page 92 of 152 PagesFact Sheet/Basis

NJ0005622/

d. Priority Pollutant Metals and Cyanide

The Permittee shall be required to report the total

recoverable metals concentration in the samples and, although

not required, may also report the dissolved metal fractions.

SAnalyses for metals and cyanide shall be conducted in

accordance with the methods approved in 40 CFR 136 to achieve

the Recommended Quantitation Level (RQL) listed in Appendix

I. Approved chelation, concentration and extraction

procedures, such as those specified in USEPA's "Methods for

Chemical Analysis of Water and Wastes", and USEPA's "Test

Methods For Evalua-ting. Solid Waste: Physical/Chemical

Methods" (SW-846), may be utilized in the analysis of total

and dissolved metal1s.

The Permittee shall collect samples for metals analyses as

composite samples. All composite samples shall be time

proportional 24-hour composites collected either manually at

least once per hour, automatically by compositor, or by

multiple grab samples of batch discharges. The Permittee

shall collect samples for cyanide analysis as grab samples.

Preservation and •bolding times shall be conducted in

accordance with 40 CFR 136. All analytical results shall be

recrted in micrograms per liter (ug/.1)

Page 93 of 152 PagesFact Sheet/BasisNJ0005622

e. Priority Pollutant Volatiles

The Permittee shall conduct analyses for volatiles in

accordance with the methods approved in 40 CFR 136 to achieve

the RQL listed in Appendix I. Samples shall be collected as

grab samples. Preservation and holding times. shall be in

accordance with 40 CFR 136. All results shall be reported in

micrograms per liter (ug/l).

f. Priority Pollutant Base/Neutrals

) . The Permittee shall conduct analyses for Base/Neutrals in

accordance with the procedures approved in 40 CFR 136 to

achieve the RQL required. Samples for Base/Neutrals analyses

will be collected as composite samples. All composites shall

be time-proportional 24-hour composites collected either

manually at least once per hour, automatically by compositor,

or by multiple grab-samples of batch discharges.

Preservation and holding times shall be in accordance with 40

CFR 136. All results shall be reported in micrograms per

liter (ug/l).

Page 94 of .152 PagesFact Sheet/Basis

NJO005622

g. Priority Pollutant Acid Extractables

The Permittee shall conduct analyses for Acid Extractables in

accordance withthe procedures approved in 40 CFR 136 to

achieve the RQL required. Samples for Acid Extractables

analyses will be. collected as composite samples. All

composites shall be time-proportional 24-hour composites

collected either manually at least once per hour,

automatically by compositor, or by multiple grab samples of

batch discharges. Preservation and holding times shall be in

accordance with 40 CFR 136. All analytical results shall be

reported in micrograms per liter (ug/l).

4. Schedule

The Permittee shall be required-to conductithe Effluent

Characterization Study monitoring at each designated outfall on

twelve separate sampling events. The Study shall be performed

between EDP and EDP + 18 months.

If a parameter (except for pollutants of concern) is shown to be

consistently less than the recommended quantitation level (<RQL

and/or not detectable - see Part IV-B/C Appendix' I) utilizing an

approved methodology (in accordance with 40 CFR Part 136) and

detection level, in a minimum of the first four 'consecutive analyses,

the monitoring for that parameter may be discontinued from the study-

Page 95 of 152 PagesFact Sheet/Basis

.NJO005622

Additionally, for once-through cooling water only, a sample may count

as a non-detect towards discontinuance from the effluent

characterization study only if the parameter is detected in the

influent and is either non-detect in the effluent or detected in theeffluent at the same level as or less than the influent.

If a paraneter (except for conventional pollutants) is detected in

one out of the first five sets of samples in the same order of

magnitude (defined as two values having an equal number of figures on

the left. side of the decimal place) as the RQL, and the Permittee has

reason to believe that the detection is "unwarranted", the Permittee

may submit a request in writing to the Department to request a

reduction in monitoring or deletion of the parameter from the Study..

However, this parameter should continue to. be included in the study

until a response is received from the Department.

For priority pollutant scans, if a single (or several) parameter(s)

are detected in one of the first four sets of samples of a particular

scan, and the Permittee has reason to believe that the detection(s)

is "unwarranted", the scan should be. continued as a part of the

study, and data for all parameters in the scan should continue to be

submitted, even though other parameters may be eligible for deletion

from the study. The Permittee may submit a request for deletion of

the entire scan from the study, but should continue to perform the

scans until a response is received from the Department.

Page 96 of 152.Pages

Fact Sheet/BasisNJ0005622

The Permittee shall be required to conduct each sampling event foor

each outfall at least 7 days apart and no greater than 60 days apart.

Monitoring for DSN 489 will be. initiated after the oil water

separator becomes operationalaand the minimum sampling frequency (7

days) shall be utilized for data collection. If the Permittee is

unable to conduct a required sampling event within 60 days of the

prior sampling event, the Permittee shall notify the Department and

include the.reason(s) in..the final report. Also,. any sampling

occurring after EDP + 18 months shall be performed weekly, the

minimum monitoring frequency, when discharge is occurring, until 12

samples are collected.

The Permittee shall be required to submit a finalýreport summarizing

the results of the Effluent Characterization Study to the Department

within 90 days from receipt of the last set of laboratory data from

the Study.

5. Evaluation of Data

In order to ensure useful data to characterize, the effluents

monitored, Appendix I contains the RQL for each priority pollutant

(including metals, acid extractables, base/neutrals and volatiles) to

be analyzed. Priority pollutantsý-which are detected by the

instrumentation but below the RQL shall be reportedas less than the

RQL.

* ag d7 of 5 ages.... .

Fact Sheet/Basis"NJ0005622

The Permittee shall submita final report summarizing the analytical

data from the Effluent Characterization Study. -The final report

shall include the analytical results in tabular format by outfall.

The Permittee shall retain copies of all analytical data includinglaboratory data sheets, for atleast five years following Submittal

of the final report. 'Copies of this data shall be provided to the

Department upon reauest.

B. Dilution Study

As discussed above, the Department must impose water quality-based

effluent limitations if any pollutant(s) has a reasonable potential

to exceed New Jersey Surface Water Quality Standards. 40 CFR

122.44(d) (). To enable the Department to determine the need for

water quality-based effluent limitations, the. Permittee may be

required to perform a Dilution Study.

The Permittee shall conduct a Dilution Study for the non-contact

cooling water outfalls (DSNs 481 " 486) and for DSN 489 if toxic

pollutants are detected in the Effluent Characterization Study for

each outfall, i.e., if after the first four samples any of the

priority pollutants remain in the Effluent Characterization Study or

if the effluent exhibits acute or chronic toxicity at'any outfall

during the Chronic Characterization Study period (See Part IV-B/C).

Page 98 of 152 PagesFact Sheet/Basis

NJO005622

If the Permittee is required to conduct a Dilution Study, the

Permittee shall submit Dilution Study Work Plan(s) for the respective

outfall(s) to the Department within 90 calendar days of (1) receipt

of the analytical results for the fourth set of Effluent

Characterization Study samples for that respective outfall(s) or (2)

receipt of theDepartment's denial of a request to terminate the

Effluent Characterization Study.

The "critical period(s)" a period of minimal dilution and/br

maximum environmental impact on aquatic life and the designated uses

of the receiving water body - shall be identified by the Permittee in

the Dilution Study Work Plan(s). The Permittee shall commence field

work for any Dilution Study during the first designated "critical

period" which occurs at least 90 calendar days after receipt of

approval by the Department of any Dilution Study Work Plan(s). If a

critical period exists during the 90 calendar days'after approval

from the Department,. the Permittee is not precluded from commencing

the Study during that period.

The model to be utilized in the Dilution Study and the ba-sis for

selection of this model shall be identified in the Dilution Study

work plan. The Permittee has historical data and model analyses

regarding the mixing. of the thermal plume from the discharge of the

non-contact cooling water. The Permittee may use this data and model

analyses in the Dilution Study, however, the Permittee shall also

S. include the bases for utilizing 'this data and model analyses in the

Page 99 of 152 PagesFact Sheet/BasisNJ0005622

Dilution Study Work Plan. Although no dye testing is required, the

Permittee may utilize Rhodamine WT as a tracer dye without further

approval from the Department. However, the appropriate NJDEPE

Enforcement Element must be notified prior to use of any dye. Since

DSN 489 will be an intermittent discharge, the use of a tracer dye is

not recormended.

The Permittee shall submit to the Department a report of the results

obtained from the Dilution Studies within ninety (90) calendar days

of the date the Permittee completes field work for the Dilution

Studies.

. C. Chronic Toxicity Characterization Study

The requirements for the Chronic Toxicity Characterization Study are

included in accordance with N.J.A.C. 7:14A-2.5(a)10 to provide data

on potential chronic effects of the effluent on the survival, growth,

and/or reproduction of the two test species. The results of the

Study will also determine which of the two test species is

consistently most sensitive to the effluent. Multi-species testing

is imposed in accordance with N.J.A.C. 7:9-4.5(f)l.i and

recommendations in the Technical Support Document for Water Quality-

based Toxics Control (USEPA 1991; EPA-505/2-90-001, March, 1991)

The Permittee shall perform a Chronic Toxicity Characterization Study

for the non-contact coo 1 4T water outfall(s) (DSNs 481 - 486) which

Page 100 of 152 PagesFact Sheet/BasisNJ0005622

) are receiving the effluent from DSN 48C during the sample event. The

Permittee may choose to align the DSN 48C effluent to a single

circulating water system outfall during sample collection, and thus

be required to perform the chronic *toxicity test on only one outfall

during each required sampling event. The Permittee. shall conduct all

testing in conformance with the guidelines contained in the "Interim

Chronic Toxicity Testing Methodologies for use in the NJPDES Permit

Program, Version 1.0, February 1989").. The laboratory performing the

toxicity testing.• shall be within the existing acute toxicity testing.

laboratory certification program established under N.J.A.C. 7:18-6.

The Chronic Toxicity Characterization Study sampling shall be

conducted on four sampling -events during the Effluent

Characterization Study.period. The first Chronic Toxicity.

Characterization sampling event shall be initiated not later than 30

calendar days after commencement of the Effluent Characterization

Study sampling> Subsequent sampling events shall be conducted at

intervals to ensure the completion of four tests during the period

scheduled for the Effluent Characterization Study but shall be at a

minimum of 30 calendar days apart.

Test results shall be expressed as t'he NOEC (No Observable Effect

Concentration) and the LOEC (Lowest Observable Effect Concentration).,

for each test endpoint.

wPage 101 of 152 PagesSFact Sheet/Basis 1

'NJ0005622

The Test Species shall be sheepshead minnow (Cyprinodon variegatus)

and inland silverside (Menidia beryllina). The tests shall be

performed using split samples. The Permittee may concurrently test

with a third species from among those listed in the methods

specified; however, the species must be approved by the Department

prior to infitiating testing with this third species.

The Chronic .Toxicity Characterization Study shall not be complete

until four tests using split samples on the two species, have been

completed. This study must be completed and a report of the results

must be submitted to the Department by the time the Effluent

Characterization Study is completed.

D. Toxicity Reduction Evaluation 4

The requirements for a Toxicity Reduction Evaluation (TRE) (in.

accordance with N.J.A.C. 7:14A-2.5(a)6) are.imposed in the Draft

Permit to ensure that immediate remedial action is initiated in the

event that continuing acute toxicity permit violations occur.

The Permittee shall conduct a TRE if any two acute toxicity tests

conducted in accordance with N.J..A.C. 7:18-6, the Laboratory

Certification Regulations, within any eighteen month period, violate

the acute toxicity limitation in the.permit. In such event, the

initial step should be to identify the variability of the toxicity of

i /

0

Page 102 of 152 PagesFact Sheet/BasisNJ0005622

the effluent(s) and to verify that an ongoing toxicity problem

exists.

If the Permittee is able to adequately demonstrate that the cause of

the acute toxicity violation is known and corrective actions have

been implemented immediately,, that activity may satisfy the TRE

requirement of the permit. A report of the investigation and

corrective'action shall be submitted to the Department. The

Permittee may conduct additional acute toxicity testing during the

reporting period in connection with fhe investigation or corrective

action. That test will not be considered as one of the two tests

that trigger a TRE only if that test is not a 96 hour definitive test

conducted in accordance with N.J.A.C. 7:18-6, the laboratory

certification regulations.

III. SECTION 316(A) VARIANCE AND SECTION 316(B) DETERMINATION

*A. Procedural History

In 1972, Congress enacted the Clean Water Act, which established the

NPDES permitting program requiring, among other things, the

regulation of thermal' discharges and intake structures used for

cooling water withdrawal. The USEPA, which held original

responsibility for administering the NPDES program, delegated its

Page 103 of 152 PagesFact Sheet/Basis

NJ0005622

program authority to the Department in 1.982, including responsibility

•for determinations under Section 316 of the Clean Water Act.

Section 316(a) of the CWA provides that alternative limits may be

applied to thermal discharges which exceed technology-based or water

quality-based effluent limits, upon a showing that the alternative

effluent limits assure the protection and propagation of a. balanced,

indigenous population of shellfish, fish, and wildlife in and on the

receiving waterbody. Section 316(b) of the CWA provides the

mechanism for a regulatory agency determination as to whether the

location, design, construction, and capacity of the cooling water

intake structure reflect the best technology available for minimizing

•.adverse environmental impact.

In 1973, PSE&G applied to the USEPA for an NPDES permit for Salem

pursuant to the Clean Water. Act.. In 1974, USEPA issued PSE&G an

NPDES permit for the Station. PSE&G submitted an application to the

USEPA in 1974 for a thermal variance from technology-based limits

under Section 316(a). Supplemental data was submitted to the USEPA

and NJDEPE in support of the variance request throughout the 1970's

and 1980's. Pursuant a 1978 consent decree with USEPA (later

incorporated in the Station's 1981 NPDES permit), PSE&G submitted a

Section 316(b) Demonstration in 1984 to the NJDEPE (which had assumed-

NPDES program authority in 1982) concerning the Station's cooling

water intake structure in accordance with a plan of study developed

in concert with various federal, regional and state agencies.

Page 104 of 152 PagesFact Sheet/BasisNJ0005622

The USEPA deferred action on the Company's Section 316(a) variance

request until completion of a review of the Company's Section 316(b)

Demonstration.

PSE&G prepared and submi.tted a Section 316(b) Demonstration to, among

- other things, evaluate the effects of the cooling system on the

population of aquatic organisms in the Delaware Estuary. Cooling

water intakes, such as the intakes at the Salem Station, can have two

types of effects on aquatic species. The first effect, called

impingement, occurs when organisms are caught on the intake screens.

The second effect called entrainment, occurs when organisms pass

through these screens and the cooling system itself.

A Technical Advisory Group ("TAG"), composed of scientists and

resources managers from the USEPA, New Jersey Department of

Environmental Protection (NJDEP, predecessor to NJDEPE), Delaware

Department of Natural Resources and Environmental Control (DNREC),

National. Marine Fisheries Service (NMFS), United State Fish and

Wildlife Service (USFWS), the United States Nuclear Regulatory

Commission, and the Delaware River Basin Commission (DRBC) had a

significant- role in commenting on the plan of study developed.by

PSE&G to evaluate the effects of impingement and entrainment.

The first steps in the development of the plan of study were the

identifi cation of aquatic populations and communities with a low

Page 105 Of' 152 PagesF'act Sheet/Basis

NJ0005622

potential for impact, which would not require detailed evaluation,

arnd the selection of species for detailed evaluation from communities

deemed to have the potential for significant impact. The species

selected for detailed evaluation are commonly referred to as "target

species" in PSE&G's submittals. (Section 316 Demonstrations for

other power plants using such a "target species" type approach are

commonly referred to as "Representative Important Species" or "RIS"

Demonstrations.) The "target species" studied in PSE&G's submittals

included: Weakfish, Bay anchovy, White perch, Spot, Atlantic

croaker, Alewife, Blueback herring, American shad, Striped bass,

Opossum shrimp, and Gammarus (scud)

The plan of study, as approved by USEPA and followed by PSE&G,

included: (1) impingement and entrainment abundance and survival E

monitoring; (2) collection of distribution and abundance data with

emphasis on primary Target Species (Weakfish,. White perch, and Bay

Anchovy).; (3) application of quantitative mathematical models to

place -plant losses into a population or community perspective; and

(4) impact analyses for other (secondary) Target Species. The

indices used for examinations (prediction) of losses to target

species included conditional mortality rates (estimates of percent

reduction in the population study area due to plant operations in the -

absence of all other sources of mortality), equivalent adult, loss,

production foregone, and lost reproductive potential.

Page 106 of 152 PagesFact Sheet/BasisNJ0005622

PSE&G's 1984 Demonstration concluded that various communities of

aquatic organisms occurring in the Delaware Estuary have a limited

potential for adverse, impact due to their preferred habitats being

.located beyond the zone of the Station's influence. These

communities include the vascular plants and associated animals

resident in the extensive marsh/littoral habitat zones along the

estuarine shorelines, the aquatic plants, and invertebrate species

residing in or on the bottom of the Es'tuary, and the -organisms

residing downriver of the Station's influence or those occurring in

freshwater tributaries of the Estuary.

PSE&G's 1984 Demonstration also concluded, in support of the TAG

determination, that most planktonic communities, due to their high

capacity to withstand localized stress, have a low potential for

adverse impact. This conclusion was based on studies of power plants

at other estuarine sites. These studies have repeatedly demonstratedthat planktonic communities have high entrainment survival rates

and/or a high capacity to withstand localized stresses. These

.communities, which are composed of the most abundant organisms in the,

water entrained by Salem, include the microbial decomposers,

phytoplankton, and nano- and micro-zooplankton communities.- These

communities' high capacity to withstand localized stresses results

from their short generation times and high reproductive rates, their

relatively high entrainment survival rate, and the transport and

rapid dispersion of these planktonic organisms 'throughout- the Estuary

by water movements. High entrainment survival rates of these species

. ...- "-. ... __-.,•- --:• . :., ,:,:. ;: •n : " .- •.-- ....-.... -7.---•,•.-- .- . _ _: • :_ __ _ - ---• -__ _ .... _ _.. .

Page 107 of 152 PagesFact Sheet/BasisNJ0005622

are probably attributable to the organisms' higher tolerance of

thermal and mechanical stresses and rapid transit time through the

cooling water system.

The nUmberof the Target Species lost due to entrainment and

impingement were estimated by PSE&G based upon on densities of

organisms -in the intake flow, their entrainment or impingement

survival rates, and the cooling water flow rates. Losses were

predicted by using established biological models, such as conditional

mortality, equivalent adult loss, production foregone, and lost

reproductive potential. The resulting analysis was used, together

with other available information, to assess the potential impact of

.. the Station's cooling, water. intake system on the Target Species. -

PSE&G filed its Section 316(b) Demonstration with the NJDEPE in 1984.

The Demonstration presented and integrated information regarding:

(1). the plant and its operations; (2) the Delaware Estuary system;

(3) life histories of the Target Species; (4) results of monitoring

programs; (5) predictive model results; (6) alternative technologies

and their costs; and (7) conclusions relative to the Station's

cooling water system intake effects.

PSE&G's 1984 Demonstration concluded that the Station was not causing

and would not cause an adverse environmental impact based on a

consideration of the following factors: assessment of mathematical

model resu-•; the conservatism of the models; the known resilience

page 108 of .152 PagesFact Sheet/BasisNJ0005622

or capacity of populations to recover or compensate for losses; the

magnitude of other known sources of exploitation; and, species

composition and abundance in a limited area. within the vicinity of

the Station prior to and .after Salem began operations. Sufficient

*long-term trend data regarding relative abundance of the species of

concern throughout the Estuary was not available at the time the 1984

Demonstration was prepared.,

Versar Review

In April 1986, the Department retained Martin Marietta Environmental

Systems (later to become Versar, Inc., "'Versar".) to conduct a

technical review of PSE&G! s Variance Request and its Section 316(b)

Demonstration. In September 1986, Versar prepared a report for

NJDEPE entitled Technical Review and Evaluation of Thermal Effects

Studies and Cooling Water Intake Structure Demonstration of Impact

for the Salem Nuclear Generating Station - Final Report.

In 1987, the Department convened a technical workshop in-an effort to

identify, understand, and resolve differences among the experts

relative to the findings and conclusions in Versar's 198.6 Report.

Representatives from the following organizations attended the

technical workshop: PSE&G and it's consultants; the Department;

DNREC; DRBC; NMFS; and USFWS. Subsequent to the technical workshop,

there were follow-up exchanges of information between PSE&G's

( consultants and Versar-concerning inputs to mathematical models.

Page 109 of 152 Pages

Fact Sheet/Basis

NJ0005622

N4

In 1988, in response to the Department's request, PSE&G submitted,

written comments (including information PSE&G presented during the

technical workshop) relative to Versar's 1986 Report. PSE&G's

submrissioh included comments concerning Versar's application of

mathematical models, selection of model input parameters (e.g.,

natural survival rates and sampling gear efficiency), interpretation

of model results and utilization of numerical decision criteria

concerning acceptable levels of impact.

In 1989, Versar prepared a revised report, entitled Technical Review

and Evaluation of Thermal Effects Studies and Cooling Water Intake

Structure Demonstration ofý Impact for the Salem Nuclear Generating

Station - Revised Final Report ("1989 Versar Report"). In this

report, Versar adjusted downward from its 1986 Report loss estimates

for certain target species.

Versar concluded that adverse effects from the thermal discharges

"were small and localized and not a major source of impact" and,

therefore, "do not need-to be reduced to protect the balanced

indigenous populations." 1989 Versar Report at V1-l.

Notwithstanding this conclusion, Versar further concluded that the

Station had the potential for long-term adverse environmental impact

for five (5) target species (Weakfish., White perch, Spot, Bay

Anchovy, and Opossum shrimp). 1989 Versar Report at V1-3 through Vi-

( . 4. )4

Page 110 of 152 PagesFact Sheet/BasisNJ0005622

As noted above in the Fact Sheet, PSE&G applied in June 1990 for a

renewal of the Station's NJPDES permit. PSE&G's 1990 Permit

Application renewed the Company's request, 'pursuant to Section 316(a)

of the CWA, for a variance from New Jersey's thermal surface water

quality standards for the Station's once-through cooling water

discharges. At that time, the NJDEPE also had under review a best

technology available determination pursuant to Section 316(b)

relative to the Station's cooling water intake system.

B. October 3, 1990 Draft NJPDES Permit

On October 3, 1.990, NJDEPE issued the 1990 Draft Permit for the

Station, accompanied by.a Fact Sheet and Statement of Basis ("1990

Fact Sheet") providing~the Department's basis for the proposed

permit. Based upon the administrative record developed as of that

time, the. Department concluded that "PSE&G [had] failed to meet the

burden of proof necessary to. entitle it to a variance [from thermal

effluent limitations] pursuant to Section 316(a) of the. ederal Clean

Water Act." 1990 Fact Sheet p. 50. The Department also found that

S... recirculating cooling towers [were] the Best Available

Technology (BAT) for controlling the thermal component of the

discharges at the facility and (were] the Best Technology Available

(BTA) for minimizing adverse environmental impacts resulting from the

cooling water intake'structure at.the facility," 1990 Fact Sheet

p.2.

Page 111 of 152 PagesFact Sheet/BasisNJ0005622

,J

The 1990 Fact Sheet noted that empirical plume survey data indicated

that water quality standards for June through August .(AT no more

than 1.5 0 F (0.8 0 C), maximum temperature of 86'F (30 0 C), except in

heat dissipation areas) were exceeded more than one mile from Salem's

cooling water discharge. 1990 Fact Sheet p. 46. DRBC and NJDEPE

regulations provide that the temperature limitations may be exceeded

by special permission in case-by-case heat dissipation areas but that

these areas must not exceed 3,500 feet in length. 1990 Fact Sheet p.

46.

Although the Department noted that the thermal plume exceeds the

surface water quality standard, the Department's conclusion that

closed cycle cooling should be required was not primarily based on an

assessment of the impacts of the Station's thermal discharge on the

aquatic community. The 1990 Fact Sheet noted Versar's conclusions

"that adverse effects from the thermal loading would likely be

restricted to a few species at temperature extremes and that [such]

adverse effects are likely to be localized." 1990 Fact Sheet p. 46.

Rather, the Department's decision to deny the PSE&G Variance Request

was primarily based on a concern regarding losses due to entrainment

and impingement. The Fact Sheet specifically notes that PSE&G failed

to meet its burden of proof necessary to entitle it to a Section

316(a) variance "based on Versar's conclusion that the applicant did

not demonstrate compliance with the criteria established in Section

Page 112 OJ 152 PagesFact-Sheet/Basis9 'NJ0005622

316(a) based on PSE&G modeling results [concerning intake effects]-"

1990 Fact Sheet p. 50.

The Department noted that Versar concluded that Salem did not meet

decision criteria for bay anchovy, weakfish, opossum shrimp, and. spot

because of "[1]arge population and production losses" and for

weakfish and white perch because "[plopulation and production losses

to. [Representative Important Species]... are a relatively large

fraction of commercial and recreational fisheries." 1990 Fact Sheet

p. 51.

The Department noted that Versar's conclusion was based, in part, on

other asserted deficiencies in data or studies concerning -the PSE&G

Variance Request such as "limited data on indirect and non-thermal

effects, integration of thermal preference and tolerance data with

environmentai temperature distribution, lack of empirical

verification of assumptions, and lack of data on habitat formers and

nuisance species." 1990 Fact Sheet p. 50.

The Department determined that a major reduction in entrainment and

impingement was needed, that the cooling tower technology provides

the highest degree of protection of any currently available

technology and, finally, that " ... closed cycle cooling ... is a.

demonstrated technology available for application at the Salem

Nuclear Generating Station." 1990 Fact Sheet p. 5 4 .

Page 113 of 152 PagesFact Sheet/Basis

"NJ0005622

' C. Comments - 1990 Draft Permit

1. Background

In response to the 1990 -Draft Permit and accompanying Fact Sheet, the

Department received a .number of comments from the public and from

state and federal agencies. Written comments were filed by eighteen

(18) individuals and agencies, including PSE&G, USEPA, and other

government entities.

Other than the comments provided by USEPA and PSE&G, the comments

reflected the strong desire of the public to protect the aquatic,

resources in the Delaware Estuary and, further, generally supported

the Department's decision to require installation of the closed cyc

cooling to protect those resources. These comments are summarized in

Attachment D of the Permit.

The most extensive comments were filed by the USEPA and PSE&G. Among

other things, the USEPA comments stated, in pertinent part, that

Section 316(b) determinations consider the technology to be applied

to cooling water intake structures and that unlike Section 316(a)

variance determinations, the decision is subject to economic

considerations. The EPA comments further stated that the economic

test is based on the Seabrook Decision, In the Matter of Public

Service Co. of New Hampshire (Seabrook Stations, Unit 1 and 2), Case

No. 76-7, slip. op. at 11. (June 10, 1977), wherein the USEPA

Page 114 of 152 Pages

Fact Sheet/BasisNJ0005622

Administrator stated that ". ... it is [notl reasonable to interpret

Section 316(b). as requiring [the) use of technology whose cost is

wholly disproportionate to the environmental benefit to be gained.".

The USEPA comments indicated that, while there were no published

USEPA guidelines relating to what constitutes wholly

disproportionate, "[if]. the costs of closed cycle cooling ... 1were)

found to be wholly disproportionate, other forms of available intake

technology could be required." In addition, the USEPA Comments

referred the Department to USEPA decisions with respect to power

plant assessments including In the Matter of Crystal River Power

Plant Units 1, 2 and 3 (Florida Power Corporation), NPDES Permit No.

FL0000159 (revised Findings and Tentative Determinations Pursuant to

.33 U.S.C. §1326, September 1, 1988) ("Crystal River Determination"),

wherein the USEPA determined that the costs of the retrofitting the

Crystal River Power Plant with closed cycle cooling were wholly

disproportionate to the environmental benefits to.'be gained and,

further, that construction of a fish hatchery, among other measures,

constituted minimization of environmental impacts of the cooling

water intake structure as required by Section 316(b).

2. PSE&G Comments

PSE&G's 1991 Comments presented substantial scientific (See

Appendices C, -E, F, H, I and P), engineering (See Appendices J and

K), and economic data (See Appendices K, L and.M) not part of the

administrative record upcn which the Department determined that

Page 115 of 152 PagesFact Sheet/BasisNJ0005622

closed cycle cooling was required. Accordingly, the Department

believes it appropriate to summarize the relevant aspects of the new

scientific, engineering, and economic data presented in PSE&G's 1991

Comments..

a. Application for Section 316(a) Variance

PSE&G's 1991 Comments presented empirical and modeling data on the

thermal plume, analyses integrating the plume data with thermal

tolerance data for the Representative Important Species, and data and

information responding to the deficiencies identified by Versar in

its 1989 Report relative to PSE&G's thermal variance application (See

(. ) Appendices E, F and P) 1990 Fact Sheet, Page 50.

i. Thermal Plume Characteristics

Because the Station had not commenced commercial operation in 1974,

PSE&G's 1974 Section 316(a) variance application was based on

anticipated or predictive thermal plume characteristics. Subsequent

to filing the Variance Request, and after commercial operations

began, PSE&G performed a thermal monitoring program to collect

empirical data on plume characteristics under operating conditions.

Based on data from this thermal monitoring program, the thermal plume'

characteristics are described in Appendix E to PSE&G's 1991 Comments,

and may be summarized as follows:

9

Page 116 of 152 PagesFact Sheet/BasisNJ0005622

The discharge exits from six pipes at the bottom of the River at a

center line pipe depth of approximately 31 feet below mean sea level,

about 500 feet offshore, at a discharge velocity of about 10.5 feet

per second. The momentum of the water as it exits from the

underwater discharge pipes causes rapid mixing with the cooler river

water.

ii. Integration of Thermal Preference Data WithThermal Plume Characteristics

PSE&G's Comments presented a biothermal assessment, which integrated

species temperature preference data with plume characteristic data to

evaluate the potential for impact on populations of organisms

encountering the plume. 1991 Comments, Appendix F.

iii. Indirect and Non-Thermal Effects

PSE&G's Comments also presented data relating to indirect and non-

thermal influences on these aquatic organisms (1991 Comments,

Appendix F). As part of the biothermal assessment, the 1991 Comments

presented an assessment of the interaction of the thermal plume and

its potential to affect other-parameters (i.e. dissolved oxygen,

chlorine, toxics, and bacteria) which may adversely impact aquatic

organisms. 1991 Comments, Appendix F.

k

The assessmentconcluded that dissolved oxygen in the River in the

vicinity of the Station continues to achieve the water quality

9

Page 117 of 152 PagesFact Sheet/BasisNJ0005622

standards desired for attaining fishable water quality; that

chlorine, with or without the thermal plume, has no adverse impact on

the ecosystem; and, that the levels of toxics and bacteria are not

preventing attainment of fishable and swimmable water quality.

b. Section 316(b) Demonstration

The assessment of potential impact presented in PSE&G's 1984 Section

316(b) Demonstration was based primarily on a predictive methodology.

The updated impact assessment provided by PSE&G in the 1991 Comments

utilized both predictive and empirical methodologies, evaluating the

model results in conjunction with available abundance and catch data.

PSE&G's 1991 Comments (Appendices I and P) supplemented the

administrative record relating to the Section 316(b) determination

and included updated estimates of potential impact based on: (1) new

information on the life history of weakfish, (i.e., natural survival

rates between life stages); (2) use of a revised assessment model

incorporating factors to account for source population distribution

to estimate spot entrainment conditional mortality; (3) new

information concerning the distribution of bay anchovy in the

Delaware Estuary; (4) inclusion of correction factors for entrainment

sampling gear efficiency; and (5) updated information on plant

operating conditions based on longer historical records (e.g., no CWS

chlorination, CWS intake flow rates, and entrainment thermal exposure

times)

Page 118 of 152 PagesFact Sheet/BasisNJ0005622

A compilation of long-term juvenile abundance data and available

recreational .and commercial fisheries catch data for the four fish

Target Species in dispute were also presented (1991 Comments,

Appendix H) These empirical data were obtained from. various

regulatory and resource management agencies.' studies conducted to

monitor the status and trends of long-term abundance and recruitment.

Lastly, PSE&G's 1991 Comments presented detailed engineering

information for capital, O&M, and replacement power cost estimates

associated with retrofitting the Station with a closed cycle cooling

system. Information relating to the engineering, costs estimates and

biological efficacy of other. alternate intake technologies was also

presented. 1991 Comments, Appendices J, K and L..

Additional engineering analyses relative to retrofitting the Station

with cooling towers were presented and include: engineering and

construction details for, and cost estimates associated with, the

proposed retrofit; a description of other modifications :(e.g.,

- condensers, piping) required to retrofit Salem with cooling towers,

and their associated costs; cost estimates for replacement energy,. if

necessary due.to Station shutdown during construction or the loss of

Station efficiency due to closed cycle cooling. 1991 Comments,

Appendices K and L.

PSE&G's engineering details indicate that retrofitting the Station9

Page 119 of 152 PagesFact Sheet/Basis

NJO005622,

• -I

with a closed-cycle cooling system would involve a complicated and

wide-scale construction effort. PSE&G indicates that the project

would involve: the excavation of over 1/4 million cubic yards of

soil, 75,000 cubic yards of which would require off-site disposal;

the demolition of large quantities of the existing circulating water

system piping and supports; installation of. over 4 miles of 7 foot

diameter pipe; and wholesale removal of existing single-pass

condensers and replacement with two-pass modular units. In addition

to the construction of the cooling towers themselves (i.e. two

natural draft cooling towers approximately 540 feet high or six

mechanical draft cooling towers 250 ft. in diameter and 70 ft. high),

PSE&G indicates that the retrofit would also require the construction

of a. new pump house, chemical control system structures, a new major

electrical power distribution system, to operate recirculating water

pumps, a make-up water system, and a blowdown system and associated

chemical. control facilities. Due to soil and subsurface conditions,

PSE&G indicates that all heavy structure would require deep pile

foundations. 1991 Comments, Appendix K.

PSE&G estimates that capital expenditures for the retrofit ranged

from $475 for natural draft cooling towers to $625 million for

mechanical draft towers. PSE&G further estimates that annual

operating and maintenance costs would increase by approximately $4

million. PSE&G indicates that Station electrical output would be

reduced during the summer period by approximately 128 MWe, based on

the use of natural draft cooling, towers. PSE&G further indicates

Page 120 of 152 PagesFact Sheet/BasisNJ0005622 -

that the capital costs associated with installing a new 100 MWe

combustion turbine unit to replace the lost capacity alone is.

estimated at $41 million. -,1991 Comments, Appendix K..,

.PSE&G further indicates that.retrofitting

cycle cooling using natural draft, cooling

the Station be shutdown for at least four

power costs associated with-an immediate

estimated by PSE&G to exceed.$2 billion.

Permit had allowed a compliance schedule,

.were estimated by PSE&G at. $544 million.

the Station with closed

towers would require that

years. The replacement

shutdown, if required, were

.Even assuming the Draft

replacement power costs

.1991 Comments, Appendix L.

0

PSE&G's 1991 Comments indicate that. neither natural draft' cooling

towers nor mechanical draft cooling towers are technically capable of

meeting the 1990 Draft Permit operating.. requirement of a 10' F

approach temperature. 1991 Comments, Appendix K. PSE&G further

indicated that approach temperatures are only used -by engineers as a

design criteria and are not reasonable as an operating requirement.

While natural draft and mechanical draft cooling towers could in

theory be designed to a 100 F approach, PSE&G concludes that they

cannot achieve a 100 F approach as an operating requirement.

PSE&G's 1991 Comments also presented an evaluation of five

alternative technologies considered to have the potential for

minimizing entrainment and impingement: wedgewire screens; variable

-speed pumps, fine-mesh screens, behavioral barriers, and modified

Page 121 of 152 PagesFact Sheet/BasisNJ0005622

fish lifting buckets for the existing Ristroph screens. See 1991

Comments, Appendix J. For the reasons summarized below, PSE&G's

Comments concluded that none of these five technologies could be

considered "best technology available" for application at Salem.

PSE&G's Comments on these technologies are summarized below:

Wedgewire Screens

Wedgewire screens have been shown to be effective in reducing fish

impingement and entrainment at several power plants. PSE&G concluded

that wedgewire screens cannot be demonstrated to be an available

technology for application at Salem in that:

Salem's cooling water flow rate is more than five times the flow

rate of any facility at which this technology has been applied;

• Suspended solids and detrital loadings are substantial,

increasing the potential for screen clogging;

The kinds of organisms associated with brackish waters in the

vicinity of Salem create the potential for a significant -

biofouling problem. Given the submerged off-shore design of the

screen elements, substantial maintenance and biofouling control

difficulties could be created.

PSE&G estimated the installation costs for a wedgewire system at

Page 122 of 152 PagesFact Sheet/Basis

NJ0005622

Salem range from $44 to $120 million, depending upon required design.

The replacement power costs associated with construction power

outages were estimated by PSE&G at $445 million.

Variable Speed Pumps

Flow reduction through the installation of variable speed pumps has

been proposed at other power plants to address entrainment mortality.

The reduction in flow rate achievable with variable speed pumps would

be expected to result in higher condenser temperatures, increased.

entrainment transit time, and a higher discharge temperature. While

flow reduction alone might produce some reductions in the number of

organisms entrained, PSE&G commented that the greater thermal stress

may increase entrainment mortality dependent on ambient river

temperatures. 1991 Comments,. Appendix J. Replacement power costs

associated with a 10% reduction in Station electric output

(associated with a 32% summer flow reduction), for instance, were

estimated by PSE&G to be $35 million for 1995 escalating to $144

million by the end of the useful life of, the Station. 1991 Comments,

Appendix J; Stone & Webster, May 1988.

Fine Mesh Screens

Several different configurations of fine mesh screens have been

installed and are in operation at other.power plants. Fine mesh

screens reduce fish entrainment, commented pSE&G, but do so by

Page 123 of 152 PagesFact Sheet/BasisNJO005622

impinging fish (that otherwise would be entrained) on the screen

mesh. The overall mortality, however, of certain species may

increase, PSE&G indicated because early life stages (i.e., eggs and

larvae) that may survive entrainment are lost due to the different

stresses associated with impingement on the screen surface.

Decreased open surface area of the screens may present substantial

operation and maintenance difficulties. Simple replacement of the

existing screen panels with fine mesh panels would not be an

available technology due. to the presence of severe biofouling and

detrital loading conditions at Salem, and the necessity to reduce

intake velocity to improve the survival of early stage of fish which

would be impinged instead of entrained.

Construction of a new screening structure would achieve the lower,

velocities which may improve potential fish survival. Full-scale

prototype testing would be required, however, to determine whether,N

the screens would operate in the river environment near the Station

and to determine whether impingement and entrainment and related

mortality rates would be reduced below existing levels. -Costs for

such a structure were estimated by PSE&G at approximately $80

million.

Behavioral Barriers

* Strobe lights to repel or divert fish from water intakes have been

tested at power plants and hydro-electric facilities with varying

Page 124 of 152 PagesFact Sheet/BasisNJO005622

success. PSE&G commented that there has, however, been no

demonstrated application of this technology at any power plant water

intake and that turbid river conditions at Salem would preclude

successful application of this technology. 1991 Comments, Appendix

J.

The use of sound to repel or divert fish from water intakes has also

been tested at power plants and at hydro-electric facilities with

varying success. American Electric Power Service Corporation has

recently developed a low-frequency sound technology that has been

proven to be somewhat successful in repelling trout and salmon in

pilot tests at hydro-electri6 facilities. PSE&G commented that there

0has, however, been no demonstrated application of this technology.

The capital cost to install a low-frequency. sound technology was

estimated by PSE&G to be approximately $1 million.

Modified Ristroph Screens

_ Improved fish buckets designed to minimize stress to, and prevent

escape of, impinged fish have been tested in the laboratory and at a

power plant on the Hudson River. These tests (laboratory. flume and

pilot field tests) indicate that the. design may significantly reduce

mortality of impinged fish.' PSE&G commented that there was, however,

no demonstrated application of this technology as of that time.

* Costs of the modified fish buckets were estimated by PSE&G to be in

,,excess of $1.5 million.

Page 125 of 152 PagesFact Sheet/BasisNJ0005622

E. PSE&G 1993 Application Supplement

On March 4., 1993, PSE&G filed the 1993 Application Supplement which

proposed Special Conditions for a proposed Draft Permit in support of

the Company's request for a.BTA determination under Section 316(b)

and a thermal variance request under Section 316(a).

As part of the Company's 1993 Application Supplement, the Company

submitted a Technical Appendix which provides the scientific and

technical basis for the proposed. Special Conditions to the Draft

Permit for resolution of PSE&G's Variance Request and the

Department's Section 316(b) BTA determination. PSE&G's proposed

Special .Conditions and the technical justification therefor may be

summarized as follows:

PSE&G Proposed Special Condition No. 1:

limitation of the circulating water system ("CWS") intake flow to

a monthly average rate not to exceed 3,024 MGD.

PSE&G Technical Justification:

The impingement/entrainment loss estimates presented in the Salem

Section 316(b) Demonstration relied upon a calculated cooling water

intake volume based upon the :assumption that the circulating water

Page 126 of 152 PagesFact Sheet/BasisNJ0005622

pumps in service operated at 100 percent of design capacity. The CWS

design flow is calculated to be 3,197 MGD.

PSE&G proposes to limit the maximum CWS intake flow so that the flow

will not exceed a 30-day average of 3,024 MGD. PSE&G will commit to

a 30-day average flow permit limit on CWS flow of 3,024 MGD, which in

effect limits the average for each circulating pump to 175,000 GPM.

PSE&G Proposed Special Condition No. 2:

modify the design of the fish buckets on the intake screens in

accordance with a design plan to be prepared by PSE&G.

PSE&G Technical Justification:

Flume tests indicate that flow through the standard Ristroph screen

may create a vortex in the fish buckets which can result in fish

being repeatedly buffeted against the screen surfaces and damaged by

abrasion.. A modification to the fish bucket design has been

demonstrated in flume studies that will reduce the vortex current and

create a somewhat sheltered region where the fish are able to

maintain a stable, upright position.

In addition, with the standard Ristroph design, fish, tend to escape,

from the fish buckets as the screen rotation lifts them out of the

water, resulting in reimpingement and increased injury or death. As

Page 127 of 152 PagesFact Sheet/BasisNJ0005622

part of the modification, a short auxiliary screen was added to the

leading edge of *each fish bucket to prevent escape of the fish. This

modification also creates a hydrodynamic condition favorable to fish

capture in the fish *buckets. Flume tests indicate that many of the

fish that move into the vicinity of the screen face tend to dive

behind the auxiliary screen and into the fish bucket. By contrast,

fish swimming in the flow above the unmodified fish buckets tend to

avoid the buckets and are repeatedly reimpinged.

Screen intake modifications were installed at Indian Point Power

Plant on the Hudson River by July 1991. Data from a pilot study at

Indian Point, which involved several of the fish species common to

Delaware Bay, i.e. white perch, bay anchovy and weakfish, indicate

that the proposed modification will increase survival of impinged

organisms. Qualitative studies indicate improved impingement

survival rates.

PSE&G Proposed Special Condition No. 3:

restoration, enhancement and/or preservation of wetlands in the

Delaware River Basin including:

a. the restoration or enhancement of an aggregate of at least

8,000 acres, of land in the Delaware River Basin such that a

minimum of 4,000. acres of diked wetlands (i.e., salt hay

farms, muskrat impoundments and agricultural impoundments)

Page 128 of 152 PagesFact Sheet/BasisNJ0005622

of the 8,000 acres be restored to (i) tidal flow and (ii)

the remaining acres of degraded wetlands, i.e., common reed

(Phragmites australis), be converted primarily to-naturally

occurring Spartina alterniflora as well as other naturally

occurring indigenous marsh grasses (e.g. Distichlis

spicata, Juncus spp.), all as more particularly described

in a management plan to be approved by the Department. The

lands restored or enhanced will have appropriate title

ownership or restrictions to assure continued protection

from development;

b. the restoration or enhancement of an additional 2,000 acres

of wetlands of the kind described in (a) above or the

preservation from future development through the

acquisition or imposition of conservation easements of at

least 6,000 acres of uplands adjacent to tidal wetlands

within the Delaware River Basin; and,

c. imposition of a deed restriction to preclude future

development of approximately 4,500 acres of land, commonly

known as the Company's Bayside Tract in Greenwich Township,

Cumberland County, approximately 2,600 acres of which are

wetlands and approximately 1,900 acres of which are.

uplands.

Page 129 of 152 PagesFact Sheet/BasisNJ0005622

PSE&G Technical Justification:

PSE&G provides a detailed technical justification for this Special

Condition in the Technical Appendix to its 1993 Application

supplement. This technical justification is briefly discussed below.

Estuarine wetlands are valuable natural resources. The entire

wetland complex in temperate zone estuaries, such as the Delaware

Estuary, produces a large amount of plant material which, after being

reduced to detritus, forms the food base for all the aquatic

organisms. On an equivalent area basis, estuarine wetlands are among

the most productive ecosystems on earth. Much of the production of

fish and shellfish in coastal ecosystems is associated with wetlands.

In addition, wetlands provide excellent spawning and nursery area for

a myriad of aquatic organisms.

The species at issue at Salem (white perch, spot, weakfish, bay

anchovy, and opossum shrimp) are all consumer organisms in the

Delaware Estuary food web. Wetland systems in the Delaware Estuary

.. provide foraging and refuge habitat, serve as nursery areas for early

life stages and juveniles, "and provide direct food resources. For

these reasons, increased wetlands in the Delaware Estuary will

contribute directly to the increased abundance of these species.

Because wetlands in the Delaware Estuary support production of the

species at issue, wetlands restoration and enhancement will minimize.

S.. . . . . . . . . . . . . . . . . . .,.. -r------------------ -

Page 130 of 152 Pages

Fact Sheet/BasisNJ0005622

the effects of Salem-related losses by increasing productivity of

these species. Wetlands restoration and enhancement, also benefits

the other species dependent on the productivity derived from the

wetlands.

Wetland production (estimated by the aggregated food chain model) was

related directly to biomass estimated to be. lost by the Station's

operations in order to estimate the wetlands restoration acreage

required to almost completely minimize adequately the effects of

Salem-related.losses by increasing the population of these species.

The food chain model estimates the production of fish biomass per

acre based on the biological conversion of wetland plant productivity

through the food chain to the fish species at issue. Primary

productivity per acre of wetland per year and food chain transfer

conversion factors were derived from published, peer-reviewed

scientific literature and were employed in this calculation using

information specific to the Delaware Estuary, where available.

Based on the estimates of fish biomass lo.st and estimates of

productivity per acre of wetland presented in the Company's Technical

Appendix, PSE&G initially calculated that 2,425 acres of wetlands was

appropriate to increase the overall populations so as to minimize the

effects of Station-related losses, thereby assuring the protection

and propagation of a balance indigenous population. PSE&G has

proposed the number of acres of wetlands to be restored or enhanced

to a minimum of 8,000 acres.

0

Page 131 of 152 PagesFact Sheet/BasisNJ0005622

I

PSE&G Proposed Special Condition No. 4

Implement a program for the elimination of impediments to fish

migration through the installation of fish ladders at up to five

candidate sites in consultation with the Department.

PSE&G Technical Justification

River herring serve as forage for a variety of important commercial

and recreational species, e.g., bluefish, white perch, weakfish, and

striped bass. Many of .the tributary streams and rivers utilized by

river herring for spawning along the Atlantic Coast of the United

States have been dammed or otherwise blocked for industrial,

irrigation, recreational, or flood control purposes. Concerns over

the effects of the loss of such spawning habitat on the stocks of

river herring (and other anadromous fishes) have led to strong

efforts in other river systems to provide fish passageways around

these impediments to create spawning runs for river herring in

tributary streams.

Recognizing the potential benefits of providing access to spawning

habitat now blocked by dams, the Department has conducted a number of

surveys of tributaries to the Delaware as part of the Department's

anadromous herring run restoration program to ascertain the presence

or absence of river herring runs and to identify specific sites which

Page 132 of 152 PagesFact Sheet/Basis

* NJ0005622

may benefit from the installation of fishways. These surveys

identified numerous barriers to potential herring passage within the

Delaware system and recommended theinstallation of fishways around

obstructions to anadromous herring runs where such a fishway would

provide -access to upstream spawning and nursery areas.

Restoration of anadromous river herring runs will increase river

herring production, increase available forage for important

commercial and recreational species (including certain of the Target

Species at issue), and increase commercial and recreational fishing

opportunities in the tributary streams to the Delaware. Scientific

studies show that river herring also may provide increased growth

rates for freshwater gamefish in impounded. waters to which they are

introduced which could lead to greater freshwater fishing

opportunities.

PSE&G Proposed Special Condition'No. 5

Conduct a study to evaluate the feasibility of using sound to

divert fish away from the CWS intake.

PSE&G Technical Justification

PSE&G proposes to conduct a study to evaluate the feasibility of

utilizing sound to divert fish away from the CWS intake. 'Successful

diversion of fish from the area of the CWS intake would reduce the

Page 133 of 152 PagesFact Sheet/BasisNJO005622

number of fish impinged onto the intake screen thereby reducing

Salem-related losses.

Recent laboratory and.field tests have indicated some success in,

diverting- certain fish species from specific areas, including cooling

water intake structures through the use of sound generating devices,

such as underwater speakers or sound projectors. Unlike poppers and

hammers-, these devices are capable of varying the frequency and

producing sounds heard by fish.

PSE&G Proposed Special -Condition No. 6

* Conduct a Department-approved biological monitoring program for

the Estuary consisting of bay-wide abundance monitoring and

impingement and entrainment monitoring.

PSE&G Technical Justification:

The biological monitoring program will consist of bay-wide monitoring

of abundance of fish and macroinvertebrates throughout the Estuary,

monitoring of impingement and entrainment, monitoring of detrital.

production, and monitoring of residual pesticide release..

Long-term abundance data will provide information as to population

status of.various aquatic species compared to past levels,

information on the factors- that may cause changes in theirI--

'4 Page 134 of 152 PagesFact Sheet/BasisNJ0005622

")populations over time and provide a basis for better understanding

the interactions and relationships between the species so as to apply

this knowledge in making prudent resource management decisions. The

program will be conducted pursuant to a work plan approved by the

Department. Monitoring results will be reported to the Department in

accordance with a schedule incorporated in the work plan.

Components of the program will include: nearfield and farfield

abundance monitoring for fish and macroinvertebrates; along shore and

salt marsh tributary sampling for fish.which use the shallow water

areas of the Estuary;. onsite impingement and entrainment monitoring;

and, special studies to investigate specific issues of concern to the

Department, including detrital production monitoring.

IV. SECTION 316 DETERMINATIONS

1. Introduction

* 7>

In the 1990 Draft Permit, a determination was made that closed cycle

cooling was an "available technology... [for reducing] the adverse

effects of the cooling water intake and thermal discharge which

threaten[ed] the balanced, indigenous Community of receiving waters.

.. 1990 Draft Permit, p. 54. Emphasis Added. This determination

was made under Section 316(a) after considering both thermal

discharge and intake effects on the "protection and propagation of a

balance indigenous population". Having made that determination, the

Page 135 of 152 PagesFact Sheet/BasisNJ0005622

Department concluded that closed cycle cooling was also BTA for

minimizing adverse environmental impact under Section 316(b)

USEPA's comments on the 1990 Draft Permit referred the Department to

USEPA determinations in other power plant cases under Section 316.

Two USEPA references to Decisions of General Counsel discuss the

relationship between Sections 316(a) and (b). In Re Central Hudson

Gas and Electric Corporation, OGC 63, 2ELPS.Fed. Ref. Service, USEPA,

NPDES Permits 371 (July 29, 1977) and OGC 75, 2ELPS Fed. Ref.

Service, USEPA, NPDES Permits 441 (January 15, 1979) While

acknowledging that the application of Section 316(a) and Section

316(b) should be coordinated to the extent possible,. Opinion No. 63

provides, in pertinent part, that "... conditions may be imposed

under Section 316(b) independent of any proceeding to modify an

effluent limitation under Section 316(a)..." (OGC 63, 2ELPS at 378)

and, further, that "... there is no legal basis for predicating

determinations under Section 316(b) on determinations under Section

316(a).". OGC 63, 2ELPS at 379.

With respect to the thermal component of the Station's discharge, the

Department, in the 1990 Draft Permit stated that its consultant had

concluded that adverse effects from the thermal loading would be

"restricted" and did not need to be reduced to protect the balanced

indigenous population. In sum, the administrative record

demonstrated that the thermal component of Salem's discharged assured

the protection. and propagation of a balanced, indigenous population.

Page 136 of 152 PagesFact Sheet/BasisNJ0005622

The Department was primarily concerned with the impingement and

entrainment effects resulting from operation of the cooling water

intake .structure when it denied PSE&G's.request for a Section .3 16(a)

variance.

As USEPA's comments indicated while economic considerations may not

be considered under Section 316(a), economic considerations are a

factor under Section 316(b). When the Department determined to* deny

the Section 316(a) variance in the 1990 Draft Permit, closed cycle.

.cooling was determined to be necessary in order for the Station's

discharge to meet limitations based on New Jersey'.s thermal surface

water quality standards. Because economic considerations may not be

.*considered under Section.316(a), the Department was not able to

consider cost as part of its decision to require closed cycle cooling

under Section 316(a) in the 1990 Draft Permit. While some dispute

may yet exist as to the exact costs, the Department agrees that

retrofitting the Station with closed cycle cooling would involve a

complicated and wide-scale construction project entailing substantial

costs.

Based on the comments received on the 1990 Draft Permit, the

Department has decided to reconsider the section 316 determinations

set forth in the .1990 Draft Permit.

0

Page 137 of 152 PagesFact Sheet/BasisNJ0005622

2. Section 316 (b) Best Technology Available Determination

Under Section 316.(b), the Department must determine whether the

location, design, construction, and capacity of Station's intake

structure reflects the best technology available (BTA) for minimizing

adverse environmental impact. At the time the 1990 Draft Permit was

issued, the Department's and PSE&G's experts disagreed as to whether

the Station's cooling water intake structure was having an adverse

environmental impact on the aquatic life in the. Bay. Versar, the

Department's consultant, concluded that the intake structure had the

potential to cause long-term adverse environmental impact to five of

the eleven Target Species studied in PSE&G's Section 316(b)

Demonstration. PSE&G's Demonstration concluded that the existing

intake structure was BTA pursuant to Section 316(b). The

disagreement between Versar and PSE&G's consultants was primarily

based on several variables and assumptions used in the mathematical

models as well as the interpretation of the model results.

PSE.&G's 1991 comments presented revised model estimates for certain

of the species at issue. Despite. the revised model estimates of

losses, disagreement still exists between PSE&G and the Department

regarding the potential for adverse impact from the Station's cooling

water intake structure. The Department determines that a potential

for adverse impacts from, the cooling water intake structure still

exists necessitating the implementation of BTA for the minimization

of adverse impacts under Section 316(b).

Page 138 of 152 PagesFact Sheet/BasisNJO005622

Decisions under Section 316(b) concerning BTA for cooling water

intake structures require a case-by-case determination and should

include an evaluation of economic considerations. BTA is intended to'

mean the best technology available commercially at an economically

practicable cost and, further, that the costs of a technology must,

not be wholly disproportionate to the environmental benefit to be

gained. In the. Matter of Carolina Power and Light Company (Brunswick

Steam Electric Plant), NPDES Permit No. NC0007064 (November 7, 1977)

at 31-32; In the Matter of Public Service Co. of New Hampshire

(Seabrook Station), Case No. 76-7 (June 10, 1977) .("Seabrook

Administrator's Decision".) at 13; Letter from Cynthia C. Dougherty,

Director, .Permits Division, USEPA to John Fields, NJDEPE.

The Department evaluated information on various alternative

technologies, including their technical feasibility, biological

effectiveness and associated costs (presented in PSE&G's 1984 Section

316(b) Demonstration, Versar's 1989 Report, PSE&G's 1991 Comments

(Appendices J, K, and L) and PSE&G's 1993 Application Supplement)

The alternative technologies having the greatest potential for

application at the Station are closed cycle cooling,.wedgewire

screens, variable speed pumps, fine mesh screens, screen

modifications to incorporate an improved fish bucket design,

circulating water intake flow limitations, and behavioral barriers,

i.e., sound deterrents..

0

Page 139 of 152 PagesFact Sheet/BasisNJ0005622

With respect to the above-referenced technologies, the Department

concludes that: (i) the estimated cost of closed cycle cooling is

wholly disproportionate to the environmental benefit to be realized;

(ii) the Department is unable to demonstrate at this time that

wedgewire screens are an available technology given the volume of

once-through cooling water used by the Station and potential for

biofouling due to the Station's location; (iii) the Department is

unable to demonstrate at this time that variable speed pumps are an

available technology for application at the Station since the lower

intake flows would lead *to higher cooling water temperature causing

additional stress to entrained organisms possibly resulting in no net

environmental benefit; (iv) the Department is unable to demonstrate

at this time fine mesh screens are an available technology for

application at the Station given the physical and biological

conditions at the Station and since fine mesh screens may cause an

overall increase in impingement mortality rates for early life stages

of many species; (v) recent •developments have occurred with respect

to the cooling water intake structure traveling screens which

incorporate an improved fish bucket design enabling the Department to

demonstrate it to be an available technology at a cost which is not

wholly disproportionate to the environmental benefits to be realized;

(vi) a restriction on the cooling water system intake flow to a

monthly average of 3,024 MGD (present average flow) is an available

technology at a cost which is not wholly disproportionate to the

environmental benefits to be realized; and, (vii) the study of and

fish behavioral barrier technologies, specifically the utilization of

Page 140 of 152 PagesFact Sheet/BasisNJ0005622

sound deterrents, is an available technology at a cost which is not

wholly disproportionate to the environmental benefits to be realized.

Based on this review of available technologies, the Department

determines the existing cooling water intake structure, in

conjunction with the screen modifications, improved fish bucket

design, a cooling water intake flow limitation, and a sound deterrent.

study, to be BTA under Section 316(b)

In connection with its reconsideration of the 1990 Draft Permit, the

Department also reviewed and evaluated other measures proposed as

Special Conditions in PSE&G's 1993 Application Supplement'.

The Department determines that the following additionally proposed

Special Conditions will minimize intake structure effects to aquatic

life in the Estuary.: restoration of a minimum of 8,000 acres of

wetlands in addition to restoration. of another 2,000 acres of

wetlands or the preservation of 6,000 acres of upland buffer in the

Delaware River Basin; a fish migration barrier removal program on

certain Delaware River tributaries; and, the conduct of a baywide

biological monitoring program.

Measures such as those included in the proposed Special Conditions,

i.e. wetlands restoration and enhancement, to minimize adverse

impacts of the cooling water intake structure have been required

under Section 316(b) by USEPA or other delegated States at other

Page 141 of 152 PagesFact Sheet/BasisNJ0005622

power plants. See, Crystal River Determinations, supra at 7-8;

Tennessee Valley Authority, John Sevier Steam Plant, NPDES Permit No.

TN0005436 (January 23, 1986); In the Matter of Central Hudson Gas &

Electric Corporation, Roseton Generating Station, et al., Decision

and Order, Docket No. C/II-WP-77-01; Appendix A (April 22, 19811;

Pacific Gas.& Electric Company, Pittsburgh Power Plant.NPDES No.

CA0004880, (April 18, 1990); Potomac Electric Power Company, Chalk

Point Generating Station State Discharge Permit Number 81-DP-0627B,

NPDES Permit Number MD0002658B (April 26, 1991).

Section 316(b) requires that an intake structure reflect BTA in order

to minimize adverse environmental impact but, further, notes that

minimization of adverse environmental impact does not necessarily

require that all losses of organisms due to Station operations be

eliminated. In the matter of Boston Edison Electric Company (Pilgrim

Nuclear Station NPDES Permit Nos. MA0003557 and MA0025135). As

discussed above, the Department determines that the existing cooling

water intake structure, in conjunction with screen modifications, a

cooling water intake flow limit, and.a study of sound deterrents, is

BTA. These BTA measures are incorporated in the proposed Special

Conditions and are expected to minimize adverse, impacts. In

addition, PSE&G proposed in its 1993 Application Supplement and the

Department is proposing in this Draft Permit, additional measures as

Special Conditions which will further minimize adverse environmental

impacts from the Station's cooling water intake structure; the

objective of Section 316(b),.

Page 142 of 152 PagesFact Sheet/BasisNJ0005622

Based on the standard articulated in the In the Matter of Carolina

Power And Light Company (Brunswick Steam Electric Plant) NPDES Permit

No. NC0007064 (November 7, 1977) at 31-32, the Department is

persuaded that BTA as used in Section 316(b) is distinguishable from

the standard "best available technology (BATt). The Department,

however, provides the following analysis in the event that is

determined not to be the case.

Where USEPA has not promulgated an industry-wide technology-based

standard, the Department must set BAT limitations on a case-by-case

basis using its best professional judgment ("BPJ") consistent with

the requirements of Section 304(b) of the CWA. Section 304(b) and

the implementing regulations (40.CFR Section 125.3(c) (2)) require

agencies including the Department to consider certain factors in

making a BPJ BAT determination, including:. the age of the equipment

and facilities; the process employed; the engineering aspects of the

application of various types of control techniques; process changes;

the cost of achieving such effluent reductions; and non-water quality

environmental impacts (including energy requirements)

Courts reviewing BAT limitations have found that effluent reduction

benefits do not need to consider resultant-ambient water quality

improvements.. Likewise, benefits do not need to be quantified in

monetary terms. There is no structure as to how these must be

Air

Page 143 of 152 PagesFact Sheet/Basis

NJ0005622

considered and there is no specific weight to be given these factors

in their consideration.

The administrative record provides detailed information on the age of

equipment and facilities involved; the process employed; the

engineering aspects of the application of various types of control

techniques; process changes; the estimated cost of achieving such

effluent reduction; and non-water quality environmental impact

(including energy requirements). Based on an analysis of this

information, the Department is unable to demonstrate at this time

that closed cycle cooling; wedgewire screens, variable speed pumps,

and fine mesh screens are "available" for application at the Station

) to reduce impingement and entrainment at a reasonable and. affordable

cost.

The existing cooling water system, in conjunction with screen

modifications, the average flow limitation, and a study of-sound

deterrents, which the Department would be able to demonstrate to be

available for application at the Station to reduce impingement and

entrainment effects at a reasonable cost, would be designated as the

BAT under Section 304(b) if that was found to be the standard

applicable to a BTA determination under Section 316(b) The

additional measures established in the Special Conditions would

further minimize adverse impacts; the objective of Section 316(b).

Page 144 of 152 PagesFact Sheet/BasisNJ0005622

Accordingly, pursuant to Section 316(b)lthe Department proposes to

allow the Station to continue to operate with the present cooling

water intake structures in conjunction with the Special Conditions

set forth in the Draft Permit.

3. Section 3.16(a) Variance Determination

The Department's thermal surface water- quality standards (N.J.A.C.

7:9-4.14) for Zone 5 of the Delaware River (the Zone applicable to

the Station) require that the water temperature-in the receiving

waters not be raised by more than 40 F (2.2 0 C) during the period from

September through May and no more than 1.5°F (0.8'C) during the

period from June through August, nor shall the maximum temperature

exceed 86°F (30'C), except in designated heat dissipation areas not

longer than 3,500 feet measured from the point of discharge.

If the Department were to establish a water quality-based effluent

limitation (WQBEL) based on these thermal water quality standards,

PSE&G could not meet it with its existing facilities. The WQBEL

would be at least as stringent as a thermal limit based on best

available technology (BAT). Therefore, the Department does not find

it necessary to determine what effluent limitation represents BAT.

PSE&G would require a Section 316 variance from the WQBEL in that the

physical dimensions of the thermal plume during the summer, as

measured by a l.5 0F (0.8 0C) above ambient isotherm, extend beyond the

0'

Page 145 of 152 PagesFact Sheet/BasisNJ0005622

mixing zone specified• in these standards and the maximum temperature

at 3,500 feet may exceed 86 0 F (30"C).

Section 303(g) provides that state surface water quality standards

for heat. are subject to and must be enforced consistent with the

standards specified in Section 316(a). Section 316(a) provides,. in

pertinent part; that the Department can impose an effluent limitation

less stringent than necessary to ensure compliance with thermal

surface water quality standards if the Permittee can show that such

effluent limitations are more stringent than necessary to assure the

protection and propagation of a balanced indigenous population.

In the 1990 Draft Permit,: the Department reviewed PSE&G's thermal

variance request taking into account the aggregate of all relevant

stresses to aquatic life in the river, including losses due to

entrainment and impingement,, in connection with a Department

determination as to whether the effects of the Station's thermal

discharge assured the protection and propagation of a balanced

indigenous population. Utilizing this approach, the Department

determined that PSE&G had failed to meet the requisite burden of

proof to support a variance from thermal effluent limitations

pursuant to Section 316(a) based primarily on the impingement and

entrainment effects of the Station's cooling water intake structure

on the protection and propagation of the balanced indigenous

population.Km

Page 146 of 152 PagesFact Sheet/Basis

9• NJ0005622

As discussed above with respect to the Section 316(b) determination,

all of the proposed Special Conditions will minimize impingement and

entrainment effects of the Station's cooling water intake structure.

The proposed wetland restoration program is a very important

component in minimizing entrainment and impingement effects,

especially as it relates to restoration of fish population.

Temperate zone tidal saltmarshes, such as those fringing Delaware Bay

and estuary, consist of.a unique assemblage of plants and animals.

In saltmarshes, much of the energy needed to support life, in the

form of food manufactured by chlorophyll-bearing plant

(carbohydrates, proteins, fats; 'and other complex materials), is

* i produced by the marsh grasses, of which the cord grasses, Spartina

spp. is the dominant species group. In most terrestrial plant

ecosystems the flow. of energy from the photosynthetic process moves

from plant material to grazers (herbivores-) to various levels of

consumers (carnivores), through a series of organisms repeatedlyeating and then being eaten. In the tidal saltmarsh systems,

however, there are few direct consumers and most of the plant

material remains unconsIumed until it dies and is washed into the

estuary. There, it is decomposed and broken down by microorganisms

into organic detritus (finely divided particulate matter).. Because

decomposition occurs continuously throughout the year, detritus is

always available for consumption by many forms of aquatic organisms.

This process helps make. tidal saltmarshes and their connecting

). estuaries among the most productive ecosystems known to exist. This

Page 147 of 152 PagesFact Sheet/BasisNJ0005622

process occurring throughout Delaware Bay supports an abundance of

fishes that are spawned there or have there larval stages carried or

deposited there. An increase in the area of saltmarsh will lead to

increased growth in marsh grasses which will lead to an increased

food supply for fishes. This increase of saltmarshes will also

result in an increase in the amount of living space (habitat)

available for the various species of fishes.

In addition, tidal wetlands provide other biological benefits to the

area. Animals such as terrestrial mammals, furbearing mammals in

particular, waterfowl and other birds and threatened and endangered

species, depend directly upon wetlands for their survival. Tidal

wetlands also provide other important functions to the entire

Delaware Bay area, including flood and storm protection, improvement

and maintenance of high quality water, and the regulation of other

biological processes including the nitrogen, sulfur, methane, and

carbon-dioxide cycles.

Tidal wetlands along the Delaware Estuary have been impacted by human

activities, including draining and filling. The Department notes

that it is reported that New Jersey has lost an estimated tens of

thousands of acres of wetlands along the Delaware Estuary.

Given the loss in acreage of wetlands along the Estuary and the fact

that the Target Species at issue (i.e., opossum shrimp, bay anchovy,

weakfish, spot and white perch) are dependent, at least in part, on

Page 148 of 152 PagesFact Sheet/Basis

NJ0005622

the wetlands-of the Estuary for food as well as habitat, the

restoration and enhancement of wetlands would increase the

productivity of these species and thereby minimize the effect of the

impingement and entrainment losses due to the Station' s operation.

*The extent to which impingement and entrainment effect are being

minimized needs to.be quantified. PSE&G utilized essentially a two

step process to quantify the minimization to be achieved by the

acreage being restored or enhanced. First, PSE&G quantified the

relationship between primary productivity per acre of wetland and

fish production (i.e., biomass) per acre of the species at issue.

Once'this relationship was established, PSE&G then estimated the

wetland acreage required to increase fish populations by dividing the

estimated fish biomass lost for each Target Species at issue due to

Station operation by- the fish biomass of that species produced per

acre of wetland., The Department determines that PSE&G's approach is

appropriate'

The Department notes that utilizing this approach, PSE&G, in its

amended application, quantified.the number of acres needed to ensure

* protection and propagation of the balanced indigenous population of

the receiving water of the Delaware Estuary to be 2,425 acres. The

Draft Permit increases the number of acres of wetlands targeted for

restoration to a minimumlof 8,000 acres.. The number of acres was

increased after application of a number of conservative assumptions.

It has been conservatively assumed that some portion of primary

0*

Page 149 of 152 Pages

Fact Sheet/Basis

NJ0005622

productivity is lost to the ocean before being consumed. A factor of

45 percent has been applied to account for the assumed loss. It has

also conservatively assumed that crustaceans and other

macroinvertebrates, as well as turtles,-birds, and other associated

vertebrates account for a sizable consumption of the net primary

productivity available to the aquatic community. Therefore, the

Department has partitioned 32 percent of the primary productivity to

these organisms.

The Department determines that PSE&G's proposal to restore or enhance

a minimum of 8,000 acres of wetlands in the Delaware River Basin is

adequate to minimize the effects of Station-related operations to

assure the protection and propagation-of the balanced indigenous

population.

Another measure in the proposed Special Conditions involves the

removal of impediments to anadromous fish (i.e., river herring)

migration on certain Estuary tributaries. River herring are

recreationally and commercially important species and the juveniles

serve as forage for other recreational and commercial species,

including certain of the Target Species at issue (i.e. weakfish and

white perch). Many of the Estuary's tributaries utilized by

anadromous fish have been dammed and that this damming has reduced

the spawning habitat available for river herring. The Department,

therefore, determines that the implementation of this measure would

provide long-term benefits to the Estuary fisheries through increased

recreatio

including

Page 150 of 152 PagesFact Sheet/BasisNJ0005622

nal and commercial fish opportunities for certain species,

certain of the Target Species at issue.

I.

The Station's current permit does not contain a CWS flow limitation.

The proposed Special Conditions impose a monthly average flow limit

of 3,024 MGD.

The proposed Special Conditions. also require the conduct of a

biological monitoring program to provide information concerning the

long-term abundance of fish and mracrdinvertebrates in the Estuary and

continued monitoring of impingement and entrainment losses,

monitoring of detrital production, and monitoring of residual

pesticide release. The Department determines that this monitoring

program will provide data relating to the abundance and diversity of

aquatic resources in the Estuary, .in general, .and data necessary for

a continued biological assessment of potential long-term adverse

environmental impacts due to Station operations.

Based on the above, the Department has determined that the Station's

cooling water system, in conjunction with the implementation of the

Draft Permit Special Conditions described above, will minimize

impingement and entrainment impacts to a level which will assure the

protection and propagation of the balanced indigenous population. In

light of this determination, the Department has reconsidered the 1990

Draft Permit determination denying PSE&G'a variance from thermal

surface water quality standards under Section 316(a).

Page 151 of 152 PagesFact Sheet/BasisNJ0005622

The Department, therefore, determines that a thermal discharge at 'the

Station which does not exceed a maximum of 1150 F (46.1 0 C) is expected

to assure the protection and propagation of the balanced indigenous

population. Accordingly, the Department determines that a WQBEL

would be more stringent than necessary to assure the protection and

propagation of. the balanced indigenous population.

The Department is, therefore, granting PSE&G's request for a variance

pursuant to Section 316(a) and is proposing thermal limits' which will

allow the continued operation of the existing once-through cooling

water system.

RENEWAL OF SECTION 316(A) VARIANCE

As discussed above, the Department proposes to grant a variance

pursuant to Section 316(a). If the Draft Permit is' finalized, the

variance will automatically be terminated upon the expiration of the

final NJPDES permit. Procedures for reissuance of a Section 316(a)

variance are virtually unchanged from an initial Section 316(a)

determination.

If upon renewal, -the Permittee wants the variance to be continued,

the request for the variance along with a basis for its continuance

must be submitted at the time of application for the renewal permit.

In the event that the Permittee wants the variance to be continued,

Page 152 of 152 PagesFact Sheet/BasisNJ0005622

. \

the Department's Section 316(a) determination will include, but not

be limited to, a review of whether the nature of the thermal

discharge or the aquatic population associated with the Station have

changed, whether the measures required under the proposed Special

Conditions have, in fact, assured the protection and propagation of

the balanced indigenous population, whether the best scientific

methods to assess the effect of the Permittee's cooling system have

changed and whether the technical knowledge of stresses caused by