Progress Update on Action Plan
Issues Actions, progress & related documents Status
A review of IOI Group’s Standard Operating Procedures that are intended to ensure compliance with principle 5 of the RSPO Principles and Criteria.
1. Internal review of the requirements under Principle 5
2. Identification of all relevant legislation and regulation pertaining to
Principle 5 using reference from P&C Indonesian Interpretation, verification with the relevant local authorities including the Ministry of Agriculture, Forestry Department, Department of Environment and Local Governor
document Legal Register Prinsip 1 to 8 submitted to RSPO and Aidenvironment
3. Identifications of all guidelines and requirement under Principle 5
particularly on the assessments and management of HCV sites and Amdal requirements
document 05-2016 (No 4) Pemantauan dan Pengelolaan submitted to RSPO and Aidenvironment
4. Consolidation of all the company’s SOPs pertaining to Principle 5
New SOPs adopted, see point (5) below
IOI is in process of adopting a new Sustainable Palm Oil Policy. A draft version has been submitted to selected group of stakeholders (NGOs, MNCs and investors) for consultation. Target date for launching new policy: mid-June
Completed Completed
Completed Completed
Issues Actions, progress & related documents Status
5. Perform Gap Analysis of the SOPs in line with the Principle 5 and the
above stated legislation & regulations and necessary guidelines and requirements in point (2) and (3) above
Completed for NPP process and used as input for item 6: revision of SOP
6. Make revision of the SOPs, if necessary, and circulate company’s SOPs
to all relevant department accordingly
SOP for NPP completed: document 02-2016 (No5) SOP NPP v01 & 05-2016 SOP Pembangunan Kebun and 20160514 Komitmen Sustainability SNA Group submitted to RSPO and Aidenvironment
Completed Completed
A statement of the means employed to ensure the identification, compliance and implementation of national and local laws and regulations related to conservation and forest areas, in order to ensure that all corrective actions are in line with principle 2 of RSPO Principles and Criteria.
7. Preparation of a Legal Register of all relevant Legislation and
Regulations pertaining to conservation and forest areas – Guided by the P&C Indonesian Interpretation and further reference with the relevant local authorities and government departments particularly the Forestry Department
Legal Register Prinsip 1 to 8 has been submitted to RSPO and Aidenvironment
8. Perform stakeholder engagement with all relevant parties on the
above Legal Register with company’s palm oil planting and our subsequent actions particularly related to forestland-kawasan hutan to determine if any further corrective actions are required and to prepare a timetable for the implementation of these corrective actions if necessary
Completed
- Completion of stakeholder engagement with Forestry Services and clarification letter is expected before Mid June 2016
Issues Actions, progress & related documents Status
discussion between IOI, AsM law firm and Aidenvironment took place 29th April 2016, minutes recorded and shared with Aidenvironment (Pending Aidenvironment’s comments)
Clarification letter from Forestry Services is expected by mid June 2016
9. Flowchart Procedure to track relevant legislation and regulations
pertaining to Palm Oil Plantation and Conservation & Forest areas
document 20160511 Flowchart Dokumen Perijinan kebun submitted to RSPO and Aidenvironment
10. Induction briefing and circulation of the Legal Register and Flowchart
Procedures to all relevant personnel
document 20160511 Flowchart Dokumen Perijinan Kebun, Legal register RSPO Prinsip 2 and Legal Register Prinsip 1 to 8 submitted to RSPO
- waiting feedback from Aidenvironment
Completed Completed
A detailed chronology of the relevant companies’ legal compliance to the requirement of Indonesian laws and regulations on the establishment and operation of oil palm plantation for each of the 3 subsidiaries which are the subject of the complaint, to ensure
11. Compilation of all Indonesian legislation, regulations, requirements
and guidance for the establishment and operations of oil palm plantation; specific reference to the P&C Indonesian Interpretation, Local Governor, Ministry of Agriculture, Forestry department, Department of Environment, Indonesia Capital Investment & Company Law, Labour Law in Indonesia and any other relevant ministries and legislations
Completed: document Legal Register Prinsip 1 to 8 submitted to RSPO and Aidenvironment
12. Preparation of the flowchart detailing the process of business
document 20160511 Flowchart Dokumen Perijinan kebun submitted to RSPO and Aidenvironment
Completed Completed
Issues Actions, progress & related documents Status
that principle 2 of the RSPO Principles and Criteria has been adhered to.
13. Sharing of all business permits, licenses, documentations and other
assessment reports for the 3 subsidiaries with the Complainant
All document stated in 20160511 Tabel Perizinan SNA Group submitted to RSPO and Aidenvironment
14. Analysis of the company’s legal applications and processes chronology
against the LUC analysis to review the correct sequential steps for all 3 subsidiaries – This sequential steps shall be adopted as the Comprehensive Checklist for future developments; The company shall also provide information on correct steps taken for PT BSS
document 20160511 Matrix of Legal Analysis and 20160511 Tabel Perizinan SNA Group performed by AsM Law firm submitted to RSPO and Aidenvironment. Feedback Aidenvironment in minutes meeting 29th April 2016
Land Use Change (LUC) analysis to be performed with the assistance of Aidenvironment and/or GEC.
Completed
- LUC analysis targeted to be completed by Mid June 2016
Clear mitigations and restoration plans on the peat area that was cleared
15. Preparation of restoration & mitigation plans for the Peat area and
the progress monitoring plans
See 16
16. Review and endorsement of the restoration & mitigations plans and monitoring plans by GEC – Mr Faizal Parish
GEC report Initial independent assessment of peatlands and HCV issues at PT BSS submitted to RSPO and Aidenvironment
GEC presented findings to Aidenvironment in meeting. Findings also shared by IOI with Greenpeace in meeting (25th May 2016)
Completed Completed
Issues Actions, progress & related documents Status
IOI is committed to execute recommendations listed in GEC report
IOI also committed to peat protection plan at landscape level
GEC will monitor progress on implementation of recommendations
17. Implementation of the above endorsed restoration works
Targeted completion by end May 2016
18. Review the implementation of the mitigation and restoration work Note: Monitoring and management of the peat areas along with quarterly reportings to be prepared for RSPO upon completion of restoration works. First report due end of August 2016 (3 months after GEC report)
Completed Completed
Peer Review of HCV assessment for the 3 Subsidiaries
19. Complainant to provide inputs to Reviewers
20. Submission of HCV assessments to Licensed Assessors for Peer
Review; Peer Reviewer is Aisyah Sileuw as agreed by Aidenvironment and RSPO
The HCV assessment reports submitted to HVC peer reviewer-Aisyah Sileuw
21. Completion of Peer reviews are subject to the Licensed Assessors
timeline
The Peer review for PT BSS and BNS has been completed and submitted to RSPO and Aidenvironment
Peer review reports for PT SKS expected to be completed by end of May 2016
Completed Completed Completed
Issues Actions, progress & related documents Status
that the planting activities conducted on land which was under forest cover up to time of development and the area outside of the Izin Usaha Perkebunan (IUP) was due to the discrepancy of the maps furnished by the Indonesian authorities
22. Jointly review of the company’s Licences, Permits, Local Decrees and
other supporting document and/or instructions with the Complainant to clarify and highlight the process adopted by the company
document 20160511 Matrix of Legal Analysis performed by AsM Law firm submitted to RSPO and Aidenvironment
document AsM Surat to RSPO on BNS Map-IUP w Kehutanan attachment submitted to RSPO and Aidenvironment
Clarification of Forest Area PT BNS with forestry services is APL – Areal Pengguna Lain: expected to be completed mid-June 2016
23. Verify any non-compliances and make corrective action if necessary
and appropriate
- Per Point 8 above :
Clarification of Forest Area PT BNS with forestry services is APL – Areal Pengguna Lain; expected to be completed mid-June 2016 (Clarification letter from Forestry Services)
- Per above if necessary
the buffer zone between the plantation and the forest areas is adequate and allows for the protection and conservation of HCV areas
24. Joint review of the Estate records and documentation along with any
relevant legislation requirements and HCV guidelines for buffer zones
Initial field visit conducted 19 – 22 April 2016
Second field visit in progress 23 May – 27 May 2016
25. Verification by technical consultants on the adequacy of the identification, monitoring and management of the HCV sites in our concession
GEC report Initial independent assessment of peatlands and HCV issues at PT BSS submitted to RSPO and Aidenvironment
IOI is committed to execute recommendations listed in GEC report
Note: Preparation of additional management systems and timetable for implementation, if necessary
Completed Completed
Issues Actions, progress & related documents Status
the construction of the canal did not harm or destroy any HCV that was on the land and complied with all legal requirements under Indonesian laws.
26. Clarification of maps, records, water diversion plan and other site
information to highlight the situation on the ground before the flood alleviation works
Completed during initial field visit 19 – 22 April 2016, see also GEC report
27. Site review and verification by Technical Consultant, GEC – Mr Faizal
Parish, of the water management & drainage network referenced in the Intertek report
Completed during initial field visit 19 – 22 April 2016, see also GEC report
28. Mr Rezit Sozer - Aksenta to provide comments on the water diversion
canal in relation to the connectivity of the HCV Site
Via email on 17th March 2016
Completed Completed Completed
List of reports submitted to RSPO
List of reports submitted to RSPO Item
1 2 3 4 5 6 7 8 9 10
20160511 Flowchart Dokumen Perijinan kebun 20160511 Matrix of Legal Analysis AsM Surat to RSPO on BNS Map-IUP w Kehutanan attachment 20160511 Tabel Perizinan SNA Group Legal Register RSPO Prinsip 2 05-2016 (No 4) Pemantauan dan Pengelolaan HCV 20160514 Komitmen Sustainability SNA Group Legal Register Prinsip 1 to 8 02-2016 (No5) SOP NPP v01 05-2016 SOP Pembangunan Kebun
9, 10 & 12 14, 22 22 13 & 14 10 3 6 2, 7, 10 & 11 6 6
11 Legal document for PT SKS
BA Pemeriksaan Lapangan IUP
DELH Kegiatan Perkebunan
Izin Lokasi
Kelayakan Lingkungan Keg Perkebunan
Kesepakatan KA-Andal BNS
Pemberian IUP BNS
13
12 Legal document for PT BNS
B.A Pemeriksaan Lap. IUP
DELH Kegiatan Perkebunan
Izin Lokasi BNS
Kelayakan Lingkungan Keg Perkebunan
Kesepakatan KA-Andal BNS
Keterangan Amdal dal Pengurusan
Pemberian IUP BNS
Telaah BPKH BNS Peta
13
List of reports submitted to RSPO Item
13 Legal documents for PT BSS
BSS peta legis
BSS SK Men Kehutanan Pelepasan Kawasan Hutan
Izin Lokasi
IUP
Surat Keterangan IUP dalam proses
13
14 15 16
Peer Review Report of HCV report for PT BNS Peer Review Report of HCV report for PT BSS Peer Review Report of HCV report for PT SKS
21 21 21
13 Initial Independent Assessment of Peatlands and HCV issues at PT BSS by GEC 16, 25, 26 & 27
14 Closing meeting PT BSS Orangutan Survey 28