Profile – Voltas Limited

80

Transcript of Profile – Voltas Limited

International Operations Business Group

Electro-Mechanical Division

Profile – Voltas Limited

Voltas is one of the world's premier engineering solutions providers and project specialists. Founded in India in 1954, Voltas Limited offers engineering solutions for a wide spectrum of industries in areas such as heating, ventilation and air conditioning, refrigeration, electro-mechanical projects, textile machinery, mining and construction equipment, materials handling equipment, water management & treatment, cold chain solutions, building management systems, and indoor air quality.

The Company's strengths lie principally in

• Management and execution of electro-mechanical projects, including air conditioning and refrigeration

• The design and manufacture of industrial equipment, cooling appliances and materials handling equipment

• Sourcing, installation and servicing of diverse technology-based systems serving Indian industry through representation of global technology leaders

2

International Operations Business Group

Electro-Mechanical Division

Operations Voltas' operations have been organized into three independent business-specific clusters. Each of these has its own facilities for market coverage and service to customers.

Projects

Over the years, Voltas has built up a substantial reputation and is actively engaged in turnkey projects in fields such as

• Electro-mechanical works comprising HVAC, electrical systems for buildings, plumbing, fire fighting, ELV and specialized systems, building security and other utilities

• Electrical power projects • Environmental and water pollution control,

pumping stations and water supply, and water and waste water treatment projects.

3

International Operations Business Group

Electro-Mechanical Division

The Company has ISO 9001 - 2000 standards certification in its projects businesses, and has successfully undertaken and executed prestigious high-value projects in the Middle East, Far East and South East Asia, CIS countries, Africa and India.

Manufacturing

With manufacturing units at Thane, Dadra and Pantnagar, Voltas possesses total capability in the manufacture of room/split air conditioners, industrial air conditioning and refrigeration equipment, water coolers, commercial refrigerators, visicoolers and freezers, as well as fork-lift trucks, cranes, warehousing and construction equipment. All these products bear the stamp of state-of-the-art plant, machinery and processes, resulting in consistently high quality and reduced costs. Sales & Service

Voltas' sales and service operations cover:

• In-house manufactured products, including air conditioning equipment, materials handling and warehousing solutions, and unitary cooling products

• Products of principals represented, including textile machinery, warehousing and cargo handling equipment, and mining and construction equipment

• In all these sectors, the company demonstrates its specialised engineering expertise, as well as its extensive network for global sourcing.

Nation-wide & Overseas facility network

• Head office in Mumbai • Zonal HQ in Mumbai, Delhi, Chennai and Kolkata • Branch/area offices in Ahmedabad, Baroda, Bangalore,

Calicut, Coimbatore, Chandigarh, Delhi, Ghaziabad, Indore, Jaipur, Jamshedpur, Kochi, Kolhapur, Lucknow, Ludhiyana, Madurai, Panjim, Pune, Secunderabad, Surat, Tirupati, Tirupur, Vijaywada and Visakhapatnam

• Overseas offices in UAE (Abu Dhabi, Dubai), Bahrain, Qatar (Doha), Kingdom of Saudi Arabia (Jeddah) and Singapore

4

International Operations Business Group

Electro-Mechanical Division

• Factories: Thane (Maharashtra), Dadra (Union Territory) and Pantnagar (Uttaranchal) Products and Services

Air Conditioners and Water Coolers: Products include window and split air conditioners, sensicool air conditioners and water coolers. Commercial Refrigeration: Products include chest freezers, deep freezers, upright coolers, visicoolers, and chest coolers. Air Conditioning and Refrigeration: Voltas has executed installations for varied applications including amongst others, Naval Warships and Mercantile Ships, Pharmaceutical Production Plants, Telecommunication and Computer Facilities, Research Laboratories, Atomic Energy Plants, Power Plants, Hotels, Information Technology Parks, Hospitals, Airports, Metro Stations, Petrochemical Plants and other diverse applications. Electro-Mechanical Projects: Voltas undertakes turnkey projects in HVAC, mechanical, public health, plumbing, electrical, building power and lighting, ELV systems, fire fighting and safety systems for airports, palaces, five-star hotels, convention centres, techno parks, training centres, power stations, railways, hospitals, auditoriums, townships, pharmaceutical factories, textile factories, etc. Water & Waste Water Projects: Products include a wide range of horizontal split casing and vertical turbine pumps for a variety of applications in cooling water and auxiliary cooling water systems, raw water and pure water systems, sea water application and hot water application (up to 700C). Textile and Machinery: Voltas is the largest supplier of textile machinery in India. Mining and Construction Equipment: In conjunction with globally renowned manufacturers, Voltas offers its customers a comprehensive package – proven expertise, long experience, the world’s best equipment and value added product support services. The products offered are:

5

International Operations Business Group

Electro-Mechanical Division

Construction Equipment:

Stationary and Tracked crushing plants and equipments

Screening and conveyor systems / equipments

Hotmix Asphalt plants

Excavators and Loaders

Dozers, Pipe Layers, Motor Graders

Mining Equipment:

Electric mining shovels Hydraulic shovels

Rigid Dump Trucks Large Capacity Wheel Loaders

OTR Tyres Drill Bits

Materials Handling: Products include diesel engine driven forklift trucks, LPG driven forklift trucks, battery driven forklift trucks and warehouse equipment. International Collaborations

Hitachi Limited - Japan vapour absorption machines and centrifugal chillers

Standard Refrigeration Company - USA direct expansion chillers

Dunham-Bush Incorporated - USA screw chillers

Siemens Building Technologies - Asia-Pacific building management systems

Ruks Engineering Ltd., - Canada ozone engineered systems Costan - Italy refrigerated cabinet display unit for hyper market engineered systems

Representations The company is also an Indian representative of a number of leading manufacturers worldwide. To name a few: Aqualon, USA SIP, Switzerland

Hercules, USA Hyundai, Korea

6

International Operations Business Group

Electro-Mechanical Division

Huntsman Tioxide, UK P&H, UK/USA

Le Tourneau Inc., Australia Terex - BL-Pegson, UK

Terex Mining - Unit Rig, USA Gencor, UK Terex Mining – O&K, Germany

Terex - Powerscreen, UK

Terrot Strickmaschinen GmbH, Germany

LMW, India

Mitsubishi Heavy Industries Ltd., Japan

Heliot International, France

Fanuc Ltd., Japan HTT, Switzerland

Dressta, Europe, USA ABA, Germany

Community Development and Environmental Protection The company has consciously laid emphasis on corporate social responsibility, ecology and environment protection. Exemplary corporate citizenship is demonstrated in numerous social upliftment projects, whether independently undertaken or with support of the Tata Council for Community Initiatives. Subsidiaries, JVs & associates Subsidiaries (India):

• Rohini Industrial Electricals • Universal Comfort Products Ltd.

Subsidiaries (Overseas):

• Weathermaker Limited • Saudi Ensas Company for Engineering Services

WLL JVs

• Lalbuksh Voltas Engineering Services & Trading Company LLC

• Universal Weathermaker Factory LLC • Universal Voltas LLC

7

International Operations Business GroupElectro-Mechanical Division

10

Profile – International Operations Business Group

(IOBG)

International Operations Business Group (IOBG), a cluster of Voltas Limited, was established in 1978 as Voltas International Limited, a wholly owned subsidiary of Voltas Limited, to handle international business interests. IOBG looks after the international business interests of the Voltas Group of Companies with core business activities in the Mechanical, Electrical and Plumbing (MEP) turnkey project areas.

Voltas-IOBG is actively engaged in turnkey projects in the following fields:

♦ Electro-mechanical works comprising Electrical Building Services, HVAC, Plumbing, Public Health, Fire fighting, LV & Specialized systems.

♦ Electrical Power Projects ♦ Environmental and Water Pollution Control ♦ Pumping Stations and Water Supply ♦ Water & Waste Water Treatment project

Voltas-IOBG complies with stringent engineering standards set by consultants; having won accolades for impeccable engineering knowledge, workmanship and adherence to quality and time schedules. Voltas-IOBG brings to each project a broad base of experience and expertise coupled with the financial and technical resources of a truly major international contractor.

International Operations Business GroupElectro-Mechanical Division

11

For Electro-mechanical projects, Voltas-IOBG have worked with reputed Consultants / Project Managers worldwide viz.:

Alexander Gibbs, UK Bechtel Corporation, USA

Wimberly, Allison, Tong & Goo, UK

Ian Benham & Associates, Abu Dhabi

BRGM, France Buckle & Partners, UK

H D P (Overseas) Ltd., UK

Hyder Consulting, UK

Kennedy & Donkin, UK Mc-Fadden & Associates, UK

Ralph Parson International, UK

Scott Wilson Kirkpatrick & Partners, UK

Sotechni Italy Tata Consulting Engineers, Turner Construction International, USA

W S Atkins, UK

White & Young, UK Mott Consortium, UK Cansult Ltd., Canada Halcrow,UK

Mace International, WSP, UK CH2Mhill, USA Ove Arup & Partners HK Ltd.

Maunsell, Australia Arkan Architects Consultant, Abu

KEO, Kuwait Tebodim Middle East Ltd. Abu Dhabi

Tractbel, Belgium Shakland Cox Ltd., UK Voltas-IOBG is ISO 9001-2000 certified for the Electro- mechanical projects division – delivering the ability to undertake the entire design, and build the system. A Global Presence Voltas is a renowned International Electro-Mechanical Contractor, having executed several specialized, multimillion dollar turnkey projects in twenty-nine countries across the globe, viz: Africa: Ethiopia, Kenya, Libya, Mauritius and Tanzania. Asia: Afghanistan, Bangladesh, Bhutan, Brunei, Hong Kong, Indonesia, Maldives, Malaysia, Nepal, North Korea, Sri Lanka and Singapore. Australia: New Zealand CIS Countries: Belarus, Kazakhstan, Russia, Tajikistan and Uzbekistan. Middle East: Bahrain, Iraq, Oman, Qatar, Saudi Arabia, UAE and Yemen Arab Republic.

International Operations Business GroupElectro-Mechanical Division

12

Voltas-IOBG in Middle East, Far East & South East Asia Voltas-IOBG has branch offices in Abu Dhabi, Dubai,Bahrain, Qatar & Singapore engaged in undertaking Electro-Mechanical projects. In addition to the above branch offices, Voltas-IOBG has established the following joint ventures in the Middle East region to undertake Electro-Mechanical projects & related maintenance work. ♦ Universal Voltas Airconditioning & Refrigeration Co.,. -

Abu Dhabi, UAE In addition, Voltas-IOBG has set up following JVs / wholly owned subsidiaries in Middle East countries. 1. Metrovol FZE, Jebel Ali, Dubai This company is wholly owned by Voltas-IOBG, and is engaged in the trading activity of Engineering Goods, Chemicals, Granite and allied engineering products. 2. Weathermaker Limited, Jebel Ali, Dubai / Universal

Weathermaker Factory LLC, Abu Dhabi, UAE Weathermaker is engaged in mechanised GSS ducting fabrication for HVAC air distribution. This company uses the latest computerised state-of-the-art machines to mass- produce the GSS ducting for deliveries in the entire Middle East region. 3. Lalbuksh Voltas Engineering Services & Trading Co. LLC, Oman This company is engaged in deep well drilling for ground water, cathodic protection and mineral exploration drilling. It handles modern irrigation systems for agricultural farms and automatic irrigation systems for parks, gardens, etc. In addition, they are involved in wastewater treatment and landscaping activities.

International Operations Business Group Electro-Mechanical Division

PROFILE –PROJECTS

S.NO. CLIENT/PROJECT BRIEF DESCRIPTION OF

PROJECT STATUS

1. Katunayake Airport Ceylon Electricity Board, Sri Lanka

Unit type substation for expansion of Airport comprising 11KV switchgear, power transformer, LT network, etc.

Completed 1975

2. Ceylon Mineral Sands Corpn., Sri Lanka

33 KV substations and internal distribution comprising LT switchboards, controls, relay panels, power & control cabling, ring main units and power transformers.

Completed 1975

3. Yak & Yeti Hotel, Nepal Central heating, ventilation and air-conditioning for a High Class Hotel Air-conditioning Plant based on Voltas, India make Reciprocating Water Chillers. Also Cold Storage installation.

Completed 1976

Electrical Works included 11KV switchgear, power transformers, standby DG sets, lighting system and LT distribution network.

International Operations Business GroupElectro-Mechanical Division

27

S.NO. CLIENT/PROJECT

BRIEF DESCRIPTION OF PROJECT

STATUS

4. Palace Complex of His Majesty the Sultan of Oman, Muscat, Oman

Air-conditioning & Ventilation of Palace Complex with a combination of Voltas, India make Air Cooled & Water Cooled Reciprocating Chiller Packages together with Air Cooled and Water Cooled Packaged Air-conditioning units. Approximate plant capacity: 800 TR

Completed 1976

5. Auditorium Complex for the Government of Mauritius at Port Louis, Mauritius

Air-conditioning & Ventilation based on Voltas, India make DX Central Air-conditioning System.

Completed 1977

6. Mechanical Training Centre, Iskandariya, Iraq Client: State Organisation for Technical Industries

Air-conditioning & air cooling main plant based on Voltas, India make Water Cooled Central Air-conditioning equipment. Air cooling by means of air washers.

Completed 1977

7. Kwality Textiles, Penang, Malaysia

Industrial Air-conditioning for a textile factory based on Voltas, India Water Cooled Chilled Water System.

Completed 1978

International Operations Business GroupElectro-Mechanical Division

28

S.NO. CLIENT/PROJECT

BRIEF DESCRIPTION OF PROJECT

STATUS

8. Sheba Hotel Sanaa,

Yemen Arab Republic Project Managers: W.S. Atkins & Partners, UK

HVAC and Plumbing works for 5 Star Hotel based on Carrier, USA make Hermetic Centrifugal Chillers. Also Cold Storage installation. Plant capacity : 300 TR

Completed 1980

Electrical Works included 15KV SF6 Switchgear, power transformers, deco-rative indoor lighting with dimmers, rising mains, lighting of plant rooms, garden lighting, power and control cabling, CATV, telephone, public address & music system, lightning protection, etc.

9. USSR Trade Representative Office, Dhaka, Bangladesh

Air-conditioning of Office complex with Carrier, USA make Reciprocating Water Chillers, AHUs and FCUs.

Completed 1980

10. Tripoli West Power Station, Libya Client: Electricity Corporation, Tripoli, Libya Consultant: Kennedy & Donkin, UK

Air-conditioning works with Carrier, USA make Reciprocating Chillers, Carrier, USA make Package units. Electrical Works included 38 Nos. 220KV disconnecting switches along with mechanical electrical inter-locking equipment.

Completed 1981

International Operations Business GroupElectro-Mechanical Division

29

S.NO. CLIENT/PROJECT BRIEF DESCRIPTION OF

PROJECT STATUS

11. Saad-3 Project

Baghdad, Iraq Client : State Organisation for Technical Industries

Air-conditioning and ventilation works. Main plant comprised Carrier, USA make hermetic centrifugal chillers, central station air handling units Plant capacity : 1600 TR

Completed 1982

12. PT Sumatex Subur

Padang, Indonesia Design of HVAC & Electrical system of a textile factory with turnkey HVAC & electrical work comprising York, USA centrifugal chillers, air washers, ducting/piping, controls, etc.

Completed 1982

Captive DG sets, power station, LV distribution, indoor lighting, earthing, power & control cabling.

13. Water Research Centre, Baghdad, Iraq Client : Director General of Studies & Designs, Ministry of Irrigation Main Contractor: R L Dalal, India

Heating, ventilation and Air-conditioning based on Carrier, USA hermetic centrifugal water chillers, air cooled packaged chillers. Plant capacity : 600 TR

Completed 1983

14.

Safwan Border Control Point, Iraq Client : State Organization of Building, Baghdad

Air-conditioning of Border Post Complex. Carrier, France Air cooled package chillers

Plant capacity : 300 TR

Completed 1983

International Operations Business GroupElectro-Mechanical Division

30

International Operations Business GroupElectro-Mechanical Division

31

S.NO. CLIENT/PROJECT BRIEF DESCRIPTION OF

PROJECT STATUS

15. Scientific Research

Centre, Baghdad, Iraq Client : State Organisation of Buildings Main Contractor: R L Dalal, India

Heating, ventilation & air-conditioning of Building Complex. Main equipment based on Carrier, USA make reciprocating water chil-lers, boilers, Package units, etc. Plant capacity : 500 TR

Completed 1983

16. Semiconductor Facility of Science, Pyong Yong, North Korea Client : United Nations Industries Development Organisation

Climate control system with special filtration. Hitachi, Japan air cooled chillers

Completed 1984

17. Dar Al Amal Hospital at Riyadh & Dammam, Saudi Arabia Design & Management Service contract

Technical & Management services for electrical system including AMF, DG sets, LT network, cabling, fire alarm, security and telephone system, Specialized lighting system, etc.

Completed 1985

18. 120 Bed Hospital at Ghat, Libya Consultant : Pole Service, Poland Main Contractor: NBCC, India

Heating, ventilation & air-conditioning for a Hospital. Main equipment York, USA centrifugal water chillers, boilers, etc. Plant capacity: 750 TR

Completed 1985

International Operations Business GroupElectro-Mechanical Division

32

S.NO. CLIENT/PROJECT BRIEF DESCRIPTION OF

PROJECT STATUS

19. Ubungo Textile Mills, Dar-Es-Salaam, Tanzania Client: National Textile Corpn. Tanzania

Design of HVAC & Electrical system of a textile factory with turnkey HVAC & Electrical work comprising York, USA centrifugal water chillers, air washers, ducting, piping, controls, etc. Plant capacity : 1200 TR Supply, installation and

Completed 1985

commissioning of HV switchgear, power trans-formers, LT distribution, indoor / outdoor lighting, cabling, PF correction panels, lightning & earthing system, etc.

20. Capsulation Project,

Moscow, Russia Client : V/o Technoprominport

Air-conditioning for a capsule manufacturing factory water cooled air-conditioning units of Carrier, USA.

Completed 1986

International Operations Business GroupElectro-Mechanical Division

33

S.NO. CLIENT/PROJECT BRIEF DESCRIPTION OF

PROJECT STATUS

21. Saudi Railways

Organisation, Dammam, Kingdom of Saudi Arabia Client: Saudi Railways Main Contractor: IRCON, India

Electrification of Railway Workshop comprising designing the system, supply and erection of mains failure. DG sets, LT distribution network, cabling, special purpose multiple socket system, clock & fire alarm system, telephone system, lighting including indoor high bay fixtures, street lighting, etc.

Completed 1986

22. Headquarter Building

for Director General of Police, Baghdad, Iraq Consultant : Hisham Munir & Associates, Iraq Main Contractor: L&T, India

Heating, ventilation & air-conditioning with Carrier, France hermetic centri-fugal chillers, AHUs, boilers.

Plant capacity : 1300 TR

Completed 1987

23. CFBL Project Iraqi Railway Authority, Samawa, Iraq Consultant: Sotecni, Italy Main Contractor: IRCON, India

Installation, testing and commissioning of 2 nos. 11KV substations and O/H line.

Completed 1987

S.NO. CLIENT/PROJECT BRIEF DESCRIPTION OF

PROJECT STATUS

24. Internal Security

Forces Housing Project, Tabuk, Saudi Arabia Consultant: International Associates Consortium of US, Greece & Saudi Consulting Co. Client: Ministry of Interior Kingdom of Saudi Arabia

Electrical works for Tabuk Housing Project for Ministry of Interior comprising 15KV Sub-station for incoming supply, HT & LT distribution system, 130 km of HT / LT and communication cabling, indoor / outdoor lighting, telecommunication, CATV, fire alarm, public address system, etc. Heating, ventilation & air-conditioning of public buildings & 576 villas. Main equipment Trane, USA Air cooled centrifugal chiller, double skin air handling units, fan coil units, split & packaged AC units, 8000 nos. through the wall AC units. Plant capacity : 2200TR. Pressurized ground water storage tank, 50 mtr. high water sand pipe system, sewage treatment plant, complete underground piping network.

Completed 1987

25. Al-Muthanna Branch

Line Project, Samawa, Iraq Consultant : Sotecni, Italy Main Contractor: IRCON, India

Air-conditioning & ventilation. Completed 1988

International Operations Business GroupElectro-Mechanical Division

34

S.NO. CLIENT/PROJECT BRIEF DESCRIPTION OF

PROJECT STATUS

26. Technical Training

Centre, Baghdad, Iraq Client: State Organisation for Water & Sewerage, Baghdad Main Contractor: Jai Prakash Associates, India

Electrification work for Technical Training Centre inclusive of H.V / L.V. Switchgear, Transformers, Fire Alarm, Telephone, Master Clock and Public Address System, Lighting & Power. Heating, Ventilation & Air-Conditioning

Completed 1990

27. Tasmania Paper & Pulp Mill, New Zealand

Design, supply, supervision of installation & commissioning of Electro Static Precipitators for power boilers.

Completed 1991

28. Tenaga Nasional Bhd., Malaysia Main Contractor: BHEL, India

Supply & Supervision of installation of ventilation works for Sultan Iskandar Power Station - I and Tuanku Jaafer Power Station III.

Completed 1992

29. SAARC Conference

Centre & Secretarial Complex Project, Thimphu, Bhutan

Design, supply, installation, testing and commissioning of H.V. and L.V. Power distribution network, indoor lighting including auditorium lighting, decorative and outdoor lighting, fire alarm system, installation of Simultaneous Interpretation System.

Completed 1993

International Operations Business GroupElectro-Mechanical Division

35

S.NO. CLIENT/PROJECT BRIEF DESCRIPTION OF

PROJECT STATUS

30. Bahrain International

Airport - Phase 1,2&3 Bahrain Consultant: Scott Wilson Kirkpatrick & Partners, UK Client: Ministry of Development & Industry Main Contractor: Ahmed Mansoor Al-A’Ali, Bahrain

Supply, Installation, testing & commissioning of various electrical systems, e.g. 3 Nos. 11/0.433KV Sub-stations, transformers, LSF HV and LV cabling, fire alarm and security system, State-of-the-art public address system, specialized lighting, Illumination signs, decorative lighting, car park lighting, and installation of Flight Information System. Air-conditioning plant comprising 3500 TR centrifugal Carrier chiller with air cooled radiators, 12 km underground chilled water piping, 40 nos. double skin air handling units, 310 fan coil units, 220 nos. electric heater batteries, 60 nos. centrifugal pumps, 75 nos. ventilation fans, hot / cold / raw / treated water system, sanitary system, drainage, fire fighting system, dry and wet riser, building management system.

Completed 1994

International Operations Business GroupElectro-Mechanical Division

36

S.NO. CLIENT/PROJECT BRIEF DESCRIPTION OF

PROJECT STATUS

31. 600 Bed Hotel Project

in Tashkent, Uzbekistan Design & Build Assignment Main Contractor: Tata Projects Ltd., India

Installation, testing & commissioning of 10 KV equipments. Supply, installation, testing and commissioning of MV panels, light fittings, cables & various low current systems. Heating, ventilation, air- conditioning, pressurization, smoke extract systems & cold storages. Voltas, India Water cooled reciprocating chillers, induction units, packaged units. Plant capacity : 900 TR

Completed 1996

32 Madinat Zayed Shopping Mall, Abu Dhabi, UAE Consultant : White & Young, UK Client : Town Planning Dept.,Abu Dhabi, UAE Main Contractor : Rizzani De Eccher, Abu Dhabi, UAE

Supply, installation, testing & commissioning of LT switchgear, cabling, lighting, fire alarm, security, public address, CCTV, Building Management & Building Indexing Systems, Supply, Installation, testing and commissioning of 2800 TR HVAC System and plumbing system

Completed 1996

33. 500 Bed Hotel Project

in Samarkand, Uzbekistan Design & Build Assignment Main Contractor: Larsen & Toubro, India

Heating, ventilation, air-conditioning and cold storages. Voltas, India Water cooled reciprocating chillers, induction units, etc.

Plant capacity : 600 TR

Completed 1996

International Operations Business GroupElectro-Mechanical Division

37

S.NO. CLIENT/PROJECT BRIEF DESCRIPTION OF

PROJECT STATUS

34. 430 Bed Hotel Project

in Bukhara, Uzbekistan Design & Build Assignment Main Contractor: Larsen & Toubro, India

Heating, ventilation, air-conditioning, pressurization, smoke extract system, cold storages. Voltas, India water cooled reciprocating chillers, induction units, etc. Plant capacity : 600 TR

Completed 1996

35. Shaikh Khalifa Medical Centre, Abu Dhabi Consultant: Hospital Design, UK Client: Department of Public Works, Abu Dhabi Main Contractor: Al Mureikhi, Abu Dhabi

Supply, installation, testing and commissioning of LT switchgear, motor control centres, cabling, lighting, lightning protection, fire alarm, telephone, inter-departmental intercom, staff paging, patient & nurse call, impulse clock, burglar control detection, access control, radio & TV, conference, sound & video projection & CCTV.

Completed 1997

Heating, ventilation & air-conditioning of a 400 bed hospital consisting of 3000 TR chilled water plant having specialized double skin air handling units, sophisticated HVAC controls and building management systems. Steam and condensate installation, chilled water piping, surface & below ground drainage, sanitary and plumbing installation, fire fighting installation, installation for fuel storage & medical gas.

International Operations Business GroupElectro-Mechanical Division

38

S.NO. CLIENT/PROJECT BRIEF DESCRIPTION OF

PROJECT STATUS

36. International Airport at

Al Ain, UAE Consultant : Scott Wilson Kirkpatrick & Partners, UK Client : Ministry Of Public Works Dept. Main Contractor: SGTM, Morocco

Supply, installation, testing and commissioning of 900 TR capacity heating, ventilation and air-conditioning system, Public Health system & Building Management System for reduced terminal building along with various other ancillary buildings.

Completed 1997

37. Al Taweelah Project,

Abu Dhabi, UAE Client : Water & Electricity Dept. Consultant : Tractbel, Belgium Main Contractor: ABB & Aerimpianti, Italy

HVAC work for power plant and desalination plant consisting of 25 buildings. Work comprises 600 MT ducting, 140 MT C.W. Piping, thermal insulation (55000 sq.mt.) for G.I. ducts & 5500 R.M. for C.W. pipes. Aluminium cladding 30000 sq.mt., fire proof insulation 5000 sq.mt. and installation of 27 nos. air cooled reciprocating chillers (150 to 250 TR capacity), 160 nos. FCUs, 65 nos. AHUs, 38 nos. EHBs, 230 nos. fans, etc.

Completed 1998

38. Ice Cream factory at

Sri Lanka Client : Wall’s Ceylon Limited Consultants : Dalal Consultants & Engineers Pvt. Ltd., Bombay

Design, supply, installation, testing & commissioning of low side HVAC system and associated electrical works for ice cream production areas, ultra clean rooms, clean rooms & amenities area.

Completed 1998

International Operations Business GroupElectro-Mechanical Division

39

S.NO. CLIENT/PROJECT BRIEF DESCRIPTION OF

PROJECT STATUS

39. Extension to Mafraq

Hospital, Abu Dhabi, UAE Client : PWD Consultant : Arab Office for Planning & Architecture Main Contractor: CIVCONS, Abu Dhabi

HVAC work of extension wing to the hospital consisting of 932 TR chiller capacity, 36 AHUs, 57 FCUs, 4200M chilled water piping, 30 tons of ducting. AC equipment to be controlled by BMS. LV Power & lighting, fire alarm, CCTV / MATV, PA / Music, Paging & Nurse Call systems, 3800 nos. light fixtures & 650 KVA Standby DG Set. Plumbing work comprising sanitary fixtures & hot / cold water piping.

Completed 1999

International Operations Business GroupElectro-Mechanical Division

40

S.NO. CLIENT/PROJECT BRIEF DESCRIPTION OF

PROJECT STATUS

40. New Hong Kong

International Airport at Chek Lap Kok, Hong Kong – Contract C 320 & 321 Client : Airport Authority of Hong Kong Main Contractor: AEH J.V., Hong Kong

Fabrication and installation of duct work (1200 MT) for entire Passenger Terminal Building including installation of AHUs (122 Nos.), FCUs (319 Nos.), Exhaust Fans(223 Nos.) with setting of automatic fabrication work shop. Chilled Water & Sea Water Piping with diameters ranging from 25mm to 1100 mm (approx.29 kms.) Supply & installation of various types of Power & Control Cables approx. 120 km, trunking – 10 km, tray – 7 km, Push Button Stations – 1600 nos. & Conduits – 18 km. Works under extension to the airport included installation of mechanical equipment, MV Substations, 400 Hz Fixed Ground Power System, Mechanical and General Building Management System, Lighting & Power Distribution, Sinage, Town Gas Piping, Plumbing & Drainage System.

C 320: Completed 2000 C 321: Completed 2001

International Operations Business GroupElectro-Mechanical Division

41

S.NO. CLIENT/PROJECT BRIEF DESCRIPTION OF

PROJECT STATUS

41. New Villa for H.H. at

Bateen Palace, Abu Dhabi Consultants: Architectural & Engg. Consultants (AEC) Main Contractor: Group 3 Engineers Contractors LLC Client: H.H. The Crown Prince of Abu Dhabi

Supply, installation, testing & commissioning of HVAC, BMS, Power & Lighting, Fire Alarm, MATV & Security System, Helipad Lighting, Plumbing & Fire Fighting, Fountain and Swimming Pool.

Completed 1999

42. Etisalat Telecommuni-

cation & Admn. Bldg., Sharjah Consultant: Cansult Ltd. Project Manager: Turner Steiner Int. S.A. Main Contractor: Arabian Construction Co. LLC, Abu Dhabi Client: Emirates Telecommunication Corpn.

MEP work for 2 basement & 20 storey unique building with segmented Radome on top. Work involves Roof top Chillers, AHUs, FCUs, specially made diffusers, silencers, VAVs, State-of- the-art Building Manage-ment System. UPS, Lighting control & dimmer system, Security / CCTV & vault system, Interpretation system, Gas extinguishing & liquid detection system, Plumbing, Fire Fighting & Sprinkler system, Fuel Handling system, Fountain system, Fire suppression system.

Completed 2000

International Operations Business GroupElectro-Mechanical Division

42

International Operations Business GroupElectro-Mechanical Division

43

S.NO. CLIENT/PROJECT BRIEF DESCRIPTION OF

PROJECT STATUS

43. Abu Dhabi Trade

Centre, Abu Dhabi Project Designers: Hellmuth, Obata & Kassabaum (HOK), USA & Campenon Bernard SGE, France Project Manager: Cansult Ltd, Canada Main Contractor : Campenon Bernard SGE/Six Construct Co.Ltd J.V. Client : H.E.Sheikh Suroor Bin Moh’d Al Nahyan

Electrical work for two level basement covered car park for approx. 3000 cars, three level podium with shopping mall, six screen cinema complex, entertainment centre, restaurants and over 260 retail shops. Electrical work covers 6 Nos.11 KV substations comprising 44 Nos. 11 KV panels, 14 Nos. distribution transformers, approximately 100 kms of HV & LV power cabling, 18500 light fixtures, LV switchboards, MCCs, distribution boards, fire alarm & voice evacuation, public address, CCTV, security access control, light control and liquid detection systems, 2 Nos. 1500 KVA DG sets and custom built energy management system.

Completed 2001

International Operations Business GroupElectro-Mechanical Division

44

S.NO. CLIENT/PROJECT BRIEF DESCRIPTION OF

PROJECT STATUS

44.

Al Jimi Cooling Plant, Al Ain, UAE Consultant: Kattner/ FVB District Energy Inc. and Shankland Cox Ltd. Main Contractor/ Client: Tabreed National Central Cooling Company (TABREED)

Engineering, Procurement & Construction (EPC) work covers entire Electro-mechanical services for chilled water generation plant. The plant capacity is 2900 TR. The system consists of water cooled hermetic centrifugal chiller – 2 Nos. each of 1200 TR and 1 No. of 500 TR capacity, primary and secondary chilled water pumps with variable frequency drives, 7 Nos. chilled & condenser water pipes, cooling towers, side stream filtrate units, 11 KV panels, 2 Nos. 2500 KVA 11 KV/3.7 KV Cast Resin transformers, 2 Nos. 1500 KVA 11 KV/415V Cast Resin transformers & motor control centre. The system uses state-of-the-art PLC/ SCADA system to monitor and control the chilled water process plant.

Completed 2001

S.NO. CLIENT/PROJECT BRIEF DESCRIPTION OF

PROJECT STATUS

45. Cyberport

Development at Telegraphic Bay, (Contract C1), Hong Kong Project Managers : Cyberport Management (site), Hong Kong. Project Designers: Ove Arup & Partners Hong Kong Limited. Main Contractor : Paul Y-ITC General Contractors Ltd. Hong Kong. MEP Sub-Contractor Hsin Chong Aster Building Services Ltd., Hong Kong. Client : Cyber-Port Limited Project Architect : Wong Tung Partners Limited, Hong Kong

Cyberport development at Telegraphic Bay provides about 112,100 square meters of first class intelligent office space ; a Cyber Center of about 27,000 square meters for a mix technology– themed educational, entertainment and retail facilities; and a 173 – room hotel. Construction of Heating, Ventilation & Air Conditioning System, Plumbing and Drainage System and Intelligent Building Management System. The total refrigeration capacity is 8500 TR. The system comprises water cooled Centrifugal Chillers, Air Handling Units, Primary & Secondary Chilled Water Pumps with variable frequency drives, sea water piping, plumbing and drainage pumps and piping.

Completed

International Operations Business GroupElectro-Mechanical Division

45

S.NO. CLIENT/PROJECT BRIEF DESCRIPTION OF

PROJECT STATUS

46. Al Udeid Project, Qatar

Main Contractor: Rizzani De Eccher, Abu Dhabi Client: Ministry of Defence, Govt. of State of Qatar

Design, Planning, Procurement and Construction and testing & commissioning (EPC) of all Mechanical, Electrical, Plumbing & Fire Fighting works for 73 buildings for Air force base. The work comprises Chillers, package units, pumps, pipes, indoor and outdoor lighting including specialized lighting for sports complex, DG sets, frequency converters, fire alarm system, clock & security system, water supply drainage & fire protection services, Fuel handling system, Inergen Dry gas fire protection system, Compressed air services, External Water & Power network.

Completed

International Operations Business GroupElectro-Mechanical Division

46

International Operations Business GroupElectro-Mechanical Division

47

S.NO. CLIENT/PROJECT BRIEF DESCRIPTION OF

PROJECT STATUS

47A. KCRC West Rail CC212 –

Siu Hong Station, Hong Kong

Project Managers : Maunsell Consultants Asia Limited. Main Contractor : HK ACE JV: Joint Venture of (a) Hong Kong Construction (Holdings) Ltd. (b) China Railway Construction Corporation (c) China Everbright Holdings Co. Ltd. (d) AMEC International Construction Limited. MEP Contractor : E & M 213 JV (AMEC) Client : Kowloon-Canton Railway Corporation, Hong Kong (K.C.R.C.) Project Architect : Parsons Brinckerhoff (Asia) Limited

KCRC West Rail CC212 Siu Hong Station - is a Mass Transit Rail interchange station in the New Territories of Hong Kong Voltas scope comprised of Installation of HVAC system for the entire station. The major Air-conditioning equipment and materials include the following; Air Cooled Chillers (1055 KW) (4 Nos.), Chilled Water Pumps (5 Nos.), Air Handling Units (14 Nos.), Fan Coil Units (117 Nos.), Split type VRV Units (90 Sets), Centrifugal Fan (12 Nos.), Axial Fans (33 Nos.), Inline Fans (74 Nos.), Propeller Fans (62 Nos.),Air Curtains (70 Nos.), Chilled Water Piping (3200m), ECS Control Field Devices (420 Nos.), Rectangular Ducts 31,000 m2, Fire Rated Enclosure to Ducts 9,000 m2, Fire Dampers (260 Nos.), Smoke Fire Dampers (70 Nos.), Motorized Smoke and Fire Dampers (73 Nos.) , Silencers (61 Nos.), Grilles and Diffusers (2000 Nos.)

Completed

S.NO. CLIENT/PROJECT BRIEF DESCRIPTION OF

PROJECT STATUS

47B. KCRC West Rail CC213 –

Tuen Mun Station, Hong Kong Project Managers : Maunsell Consultants Asia Limited. Main Contractor : HK ACE JV: Joint Venture of (a) Hong Kong Construction (Holdings) Ltd. (b) China Railway Construction Corporation (c) China Everbright Holdings Co. Ltd. (d) AMEC International Construction Limited. MEP Contractor : E & M 213 JV (AMEC) Client : Kowloon-Canton Railway Corporation, Hong Kong (K.C.R.C.)

KCRC West Rail CC213- Tuen Mun Station - is a Mass Transit Rail Terminus constructed above the Tuen Mun River in the New Territories of Hong Kong Voltas scope comprised of HVAC , Fire Fighting, Plumbing & Drainage System installation for the entire station. The major Air-conditioning equipment and materials included the following; Air Cooled Chillers (1055 KW) (3 Nos.) , Chilled Water Pumps (4 Nos.), Air Handling Units (14 Nos.),Fan Coil Units (94 Nos.), Split type VRV units (106 Nets), Centrifugal Fan (15 Nos.), Axial Fans (37 Nos.), Inline Fans(118 Nos.), Propeller Fans (62 Nos.), Air Curtains (50 Nos.), Chilled Water Piping(4600m), ECS Control Field Devices (500 Nos.), Rectangular Ducts 44,000 m2, Fire Rated Enclosure to Ducts 16,000 m2, Fire Dampers (231Nos.), Smoke Fire Dampers (74 Nos.), Motorized Smoke and Fire Dampers (259 Nos.), Silencers (199 Nos.), Grilles (2048 Nos.) The Station Fire Services works comprised of the following systems; Fire Hydrant and Hose Reel System (3 Pump sets). Automatic Wet Sprinkler System (3 Pump sets). Recycling Pre-action Sprinkler System; Street Fire Hydrant System (3 Pump

Completed

International Operations Business GroupElectro-Mechanical Division

48

sets.) The station Plumbing and Drainage works comprised of the following systems; Potable Water System (2 Pump sets.); Flushing Water system (2 Pump sets.); Cleansing Water System (2 Nos. Pump Sets.); Rain Water Disposal System; Foul Water Drainage System.

S.NO. CLIENT/PROJECT BRIEF DESCRIPTION OF

PROJECT STATUS

48. Central Plant &

Infrastructure Facilities (Package 8) for Emirates Palace Hotel Complex,

Abu Dhabi,UAE Main Contractor: Voltas Client: Conference Palace Hotel Executive Committee Project Manager: Turner Construction International

6 x 2000 TR 11KV Chillers, Cooling Towers, AHUs, FCUs, pre-insulated piping, Pumps, Steam, fuel, ozone, fire fighting, Inergen gas, deluge, LPG system, BMS, 11KV Switchboard, Transformers, 5 x 2.45 MW DG Sets, 24 km HV/LV cables, External/Internal/ Emergency lighting, Plumbing & fire alarm system. Civil work covering Plant Bldg. (5166 m2), 5 mio gallon water storage tank, workshop, etc. Kitchen & laundry eqpt.

Completed

49. District Cooling System

at Muroor Road & Sh. Zayed Sports City, Abu Dhabi Main Contractor: Dhafir Development & Contracting (LLC) Consultant : KEO Client: National Central Cooling Company, (Tabreed) Project Management Consultant: M/s. Tebodim Middle East Ltd. Eng. Consultant: M/s. Tecsult Intl. Ltd., Montreal, Canada

The work comprises the Engineering, Procurement and Construction (EPC) of a District Cooling Plant. The equipment comprises of 4 Nos. water cooled centrifugal chillers each of capacity 1875 TR with necessary CHW & CW Pumps, Piping, forced induced Draft Cooling Towers, Side Stream Filtration Units. PLC & SCADA System, Controls, Building Services 14 Nos. 11KV Panel, 3.3 KV MCC, 2 Nos.7.5 MVA, 2 Nos.2.5 MVA Transformers, HV/LV Power Distribution, etc.

Completed

International Operations Business GroupElectro-Mechanical Division

49

International Operations Business GroupElectro-Mechanical Division

50

S.NO. CLIENT/PROJECT BRIEF DESCRIPTION OF

PROJECT STATUS

50. East Wing & West Wing

Hotel Towers & Parking Garage/Ramp (Package 10A) – part of Conference Palace Hotel project, Abu Dhabi Main Contractor: Voltas Consultant : KEO Client: Conference Palace Hotel Executive Committee Project Manager: Turner Construction International

MEP work for 2 identical G+4 floors hotel towers. 16 Nos. AHUs, 402 Nos. FCUs, 170 MT ducting, CW Piping, Pumps, 11KV Switchboard, 2 x 1500 KVA Trafos, LV Switchboard, 2.5 km Bus ducts, 3034 light fixtures, UPS, Central Battery System, FA, Dimming, Clock & Security system. Kitchen eqpt.

Completed

51. Changi Water

Reclamation Plant, Singapore Main Contractor: United Engineers (Singapore) Pte. Ltd., Singapore Client: Public Utilities Board of Singapore

Design Engg., Supply, Installation & Commissioning of various Process Equipment mainly for Screening & Grit Collection/ Classification System, Anoxic Zone Mixing System, Scum Removal & Concentration System, Chemical Dosing Systems, Storage Tanks in Stainless Steel and Fiber Glass Reinforced Plastic Construction, Piping in Cement Lined Ductile Iron (26 km) size 80 mm to 3000 mm dia, Stainless steel (21km) size 12mm to 3000 mm dia, CPVC/PVDF Pipes (6 km) size 15mm to 600 mm dia. Valves 2500 Nos., sizes 12 mm to 3000 mm dia.

Completed

International Operations Business GroupElectro-Mechanical Division

51

S.NO. CLIENT/PROJECT BRIEF DESCRIPTION OF

PROJECT STATUS

52. Male International

Airport, Maldives Main Contractor : M.A.Al-Kharafi & Sons, Kuwait Client : Maldives Airport Company Limited Consultant : Sir Fredric Snow (Intl.) U.K

MEP Works in the following areas : • A new Control Tower • A new ATS Bldg. • A new Energy Centre

Bldg. • A new Accommodation

Blgd, • Upgrading existing

Terminal Bldg. incl. new departure pier

• A new Domestic Terminal Bldg. (conversation of ground floor of existing Admn. Block)

• 4 Nos. Package Substations & External 11KV cable distribution network approx. length 8 KM

Completed

53. Marina Mall

Extension Project, Abu Dhabi, UAE Main Contractor: Emirates Belbadi Contracting Co. Ltd., Abu Dhabi, UAE Client: National Investment Corporation Project Manager: MACE International

Extension to Marina Mall comprises 2 basements, GF, FF & roof with 100 mtr. High tower and is inter-connected to the existing Mall at ground & first floor. The extension to Mall has a built-up area of approx.90,000 m2. Scope of work includes large AHUs (56 Nos.), FCUs, chilled water piping, ducting, plumbing & drainage work covering water storage tanks, water filtration system, booster pumps, rain water & sewage drainage. Fire fighting works include automatic sprinkler and fire fighting &extinguishing system. Electrical works include 11KV Switchgear, transformers, cables, LV switchboards, DG sets, lighting & power, CCTV, security system, public address, audio/video & mall information system.

Completed

S.NO. CLIENT/PROJECT BRIEF DESCRIPTION OF

PROJECT STATUS

54. Mall of the

Emirates, Dubai, UAE (in JV with IEMSC, Dubai) Main Contractor: KhanSaheb Civil Engineering LLC, Dubai, UAE Project Manager: MACE International, UK Client: Majid Al Futtaim Investment LLC Consultant: WSP, Dubai, UAE

HVAC & ELV system work for the largest shopping mall outside North America with built- up area of 6.5 mio sq ft. Scope of work covers 88 nos., AHUs, 688 Nos FCUs, Ducting 52000 sq mts, Piping 24000 mtr, VFDs, fans, BMS, CCTV & Access control, people counting system & structured cabling

Completed

55. Science Park Building,

Hong Kong Main Contractor : Dickson Construction Co. Limited Building Services Contractor : The Jardine Engineering Corporation Limited Client : Hong Kong Government Project Architect : Architectural Services Department of The Government of HKSAR

The building has a Basement, Ground plus 6 Floors, a Roof and Upper Roof floor. Plant rooms and mechanical equipments are installed in the Basement, Roof and Upper Roof Floors, while the Business Areas and the Offices occupy the Ground and six typical floors The major Air-conditioning equipment comprises of Water Cooled Chillers (880 KW -4 nos), Heat Pumps (350 KW- 2 Nos.), Cooling Towers (1055 KW-4 nos.), Air Handling Units ( 27 nos) , Fan Coil Units ( 11 nos.) , VRV Split Units ( Outdoor Units – 2 nos. & Indoor Units – 18 nos.) , Pumps for the HVAC as well as the P & D systems ( 31 nos) and VAV complete with Direct Digital Controls ( 704 nos), 4.6 Kilometers of Pre-insulated Pipes with Galvanized Iron Cladding and 20,000 sq.mtrs. of Pre-insulated Ducts. All the equipment and the services

Completed

International Operations Business GroupElectro-Mechanical Division

52

like Lifts, Fire Services, Security, Generators, L.V switch boards and Plumbing systems are controlled by the Integrated Building Management System (IBMS).

S.NO. CLIENT/PROJECT BRIEF DESCRIPTION OF

PROJECT STATUS

56. Villaggio Retail, Sports

and Entertainment Centre, Doha, Qatar Client : Qatar Real Estates & Projects & Trading Company Main Contractor: N.A (Nominated MEP Subcontractor) Consultant: Qatari Engineers & Associates

Construction, Completion, Operation and Maintenance of MEP Works.

Completed

57. Jumeirah Beach

Residence 4,. Dubai, UAE Main Contractor : Al Habtoor Engg. Enterprises Co.LLC., Dubai, UAE Project Manager : MACE International, UK Consultant : Roberts & Partners, UK Supervisory Consultant : Arif Bintoak Consulting Architect & Engineers, Dubai, UAE

JBR is one of the largest prestigious residential complex of multi storey high riser towers. The scope covers MEP Works for 8 Towers and Podium. Height of Towers range from 41 to 50 floors. Scope of work covers HVAC, Electrical, ELV System, Plumbing, Fire Fighting & Drainage. The work involves complex logistic. Each Tower to house more than 150 apartments including a grand shopping mall at the ground & mezzanine levels. The equipment for MEP services includes 21 Heat Exchangers, 63 CHW Pumps, 104 AHUs, 5,200 FCUs, 78 km of CHW Piping, Car Park Ventilation System encompassing 160 Jet fans, 400 MT of GSS Ducting, 34 Main LV Panels serving 51 MW of connected load, 374 SMDBs, 1300 DBs, more than

Completed

International Operations Business GroupElectro-Mechanical Division

53

40,000 small power outlets, 45,000 light fixtures, 20,000 Tel & Data Outlets, Structured Cabling System, Fire Alarm System, Emergency Central Battery System feeding 7,000 fixtures, 34 APFC panel, 2 X 1600 kVA DG Sets with 3000A DG Distribution panels. LSF, FP-200, FP-400 Cabling, Earthing & Lightning Protection System, CO Monitoring System, Automatic Sprinklers, Booster Pumps, Water Tanks, Fire fighting & Extinguishing System, Rain Water and Drainage system & a Building Management System for central control of all these services.

International Operations Business GroupElectro-Mechanical Division

54

S.NO. CLIENT/PROJECT BRIEF DESCRIPTION OF

PROJECT STATUS

58. Wafi Hotel & Mall, Dubai,

UAE Main Contractor : Khansaheb Civil Engg.LLC, Dubai, UAE Main Consultant : Arif Bintoak Consulting Architects & Engineers, Dubai, UAE MEP Consultants : Hyder Consulting, Dubai, UAE

Pyramid shape hotel consisting of 188 guest rooms, 52 Delux luxurious suites, 9 food and beverages outlets, grand ballroom, 7 meeting rooms, spa & gymnasium. The hotel complex also has 242,000 Sq.Ft.retail space (two floors) with over 90 shops and a large Department store. Scope covers entire MEP services. The Broad distribution of works are ELECTRICAL : Complete electrical systems including incoming power service, Autotransfer Switches, Power distribution switchgear, 9 LV Panels, 60 & 100 kVA UPS, Motor Control Centres, 25 Submain Distribution Boards, 1 Standby Generator of 1500 kVA Capacity, containment and cabling. MECHANICAL : Complete HVAC Systems on the Low Side including Air Handling and Fan Coil Units, Heat Exchangers, Pumps, Air Distribution to the Mall building. – The equipment for MEP services includes 16 CHW Pumps, 22 AHUs, 951 FCUs, 26 km of CHW Piping, 118 Jet Fans, 54,000 sq. m of GSS ducting The Chillers, Cooling Towers etc are part of a separate contract. PLUMBING : Drainage, Waste and Vent Systems including the necessary piping and distribution. Automatic Sprinklers, Booster Pumps, Water Tanks, Fire fighting & Extinguishing System, Rain Water and Drainage System Hot and Cold Water Systems including Calorifiers, Boilers and Storage Tanks. LPG Systems including Storage Tanks and distribution.

Completed

ELV Systems The ELV systems are

1. Structured Cabling 2. PABX 3. HI TV and Hotel

Management 4. Lighting Control system 5. BMS 6. Security systems including

CCTV and Card Access 7. Public Address system 8. Emergency Lighting System

International Operations Business GroupElectro-Mechanical Division

55

S.NO. CLIENT/PROJECT BRIEF DESCRIPTION OF

PROJECT STATUS

59. Mall of Emirates Hotel,

Dubai, UAE Main Contractor : Bu Haleeba - Al Jaber Grinaker – LTA JV, Dubai, UAE Project Manager ; MACE International, UK Client : Majid Al Futtaim Investments LLC, Dubai, UAE Consortium Partners : IEMSC, Dubai, UAE

2 Basement + Ground Floor + 18 floors 5 Star Hotel consisting of 400 suites, 7 Restaurants, 8 Conference Rooms, Swimming Pool & Health Club as part of overall development of Mall of Emirates Complex. Scope of work covers HVAC & ELV System for a Five Star Hotel managed by Kempinski . Plant Capacity: 1,900 TR HVAC & ELV Works The equipment for MEP services includes 3 X 2240 KW Heat Exchangers, 4 CHW Pumps, 47 AHUs, 890 FCUs, 20 km of CHW Piping, 35,000 sq. m of GSS ducting. The ELV systems comprise of Building Management System, Structured Cabling, CCTV, Access Control, SMATV & Radio System, Active and Passive Elements of Structured Cabling

Completed

S.NO. CLIENT/PROJECT BRIEF DESCRIPTION OF

PROJECT STATUS

60. Burj Tower, Dubai, UAE

Main Contractor : Samsung- Besix-Arabtec JV Client : EMMAR Properties pjsc, Dubai, UAE Consultant : Skidmore Owing and Merrill LLP, USA Project Manager : Turner Construction International LLC, Dubai, UAE Supervisory Consultant : Hyder Consultant Middle East Ltd., Dubai, UAE Joint Venture Partners : ETA, Dubai and Hitachi Plant, Japan

Burj Tower is the tallest building (over 700 Mtrs) in the world surpassing Taipei 101 Tower (508 Mtrs) in Taiwan. The building will have 162 floors with two level car park. Tower includes 5 star hotel, residential services apartment floors, observatory deck, communication equipment floor, amenity support, leisure and recreational facilities, food and beverage outlets, podium and attached 4 storey office building and a swimming pool annex.

“MEP Work is being carried out thru’ Joint Venture (JV)”

JVs Scope of Work covers : Mechanical : Complete HVAC Systems on the Low Side including Air Handling and Fan Coil Units, Heat Exchangers, Pumps and Air Distribution to the Mall building.

Plumbing : Drainage, Waste and Vent Systems including the necessary piping and distribution, Fire Fighting Systems such as Sprinkler and FM200 protection and LPG Systems including Storage Tanks and distribution. Hot & Cold Water Supply System including Water Storage tanks, pumps & accessories. Electrical : Complete Electrical System including Incoming Power Supply, 11/415 KV Transformers, Standby generators, auto transfer switches, Power Distribution Switchgear, Motor Control Centres, Distribution Boards, Light Fittings, containment and cabling. Specialist ELV Systems like Security, Fire Alarm, Emergency Lighting, BMS, CCTV and Structured Cabling.

Completed

International Operations Business GroupElectro-Mechanical Division

56

International Operations Business GroupElectro-Mechanical Division

57

S.NO. CLIENT/PROJECT BRIEF DESCRIPTION OF

PROJECT STATUS

61. Hyderabad International

Airport, Hyderabad, India Main Contractor : China State Construction Engineering (Hong Kong)Ltd, Hong Kong Consultant : Ove Arup & Partners Hong Kong Ltd, Hong Kong Client : Hyderabad International Airport Ltd (HIAL) , Hyderabad, India

HVAC System, Electrical System, Plumbing & Fire Fighting Systems, Low Voltage Systems (Building Automation System & SCADA, Fire Detection & Suppression System), Visual Docking Guidance System (VDGS) & Access Control System for Passenger Terminal Building (of over one lakh sq.mtrs.) and Air Traffic Control Tower with adjacent Technical Building.

Completed

62. Bharat Heavy Electricals

Ltd, Ruwais, Libya Client : General Electricity Company of Libya Consultant : Arabian Consulting & Engineering Services Co. Main Contractor : BHEL, New Delhi

4 x 156.1 MW Gas Turbine Power Project, Western Mountain, Ruwais, Libya Supply and supervision of installation & Commissioning of HVAC System

Completed

S.NO. CLIENT/PROJECT BRIEF DESCRIPTION OF

PROJECT STATUS

63. Refurbishment of

Intercontinental Hotel, Abu Dhabi, UAE Main Contractor : Voltas Limited, Abu Dhabi, UAE, is nominated MEP Contractor Client : National Corporation for Hotels and Tourism, Abu Dhabi, UAE Consultant : Ian Banham Associates, Abu Dhabi, UAE Project Manager : Turner Construction International LLC, Abu Dhabi, UAE

The Scope of works comprises of refurbishment works of the Intercontinental Hotel at Abu Dhabi and includes refurnishing and upgrading of all the MEP works in the Central Plant, stripping and refurbishment of MEP services of all levels and civil works of Back of House at levels 1 and 1M only which include areas like Service Yard, Central Plant, F & B Store, Main Kitchen, etc. It also includes the clearing out of the existing MEP services and equipment especially in the Central Plant. The Broad scope of works is : ELECTRICAL : Downstream works related of Main Panel and Sub-main Boards originating from the Additional 1500 KVA Oil filled Transformer. Complete electrical systems including Power Distribution Switchgear, Motor Control Centres, Distribution Boards, Containment and Cabling, Specialist ELV Systems like Security, Fire Alarm, Guard Tour, PA System, Building Intercom, Emergency Lighting, BMS and CCTV HI TV and Hotel Management. MECHANICAL : Removal and Refurbishment of MEP Equipment in the Central Plant. Chillers – 4 Nos ( 2 new 700 TR + 2 relocate ) Boilers - 2 Nos ( New ) Secondary Pumps – 4 Nos ( New ) Primary Pumps – ( 2 new + 2

Completed

International Operations Business GroupElectro-Mechanical Division

58

Relocate ) Cooling Tower – ( 1 New + 1 Relocate ) Complete HVAC Systems in the Front of House areas and Guest Rooms on the Low Side including Air Handling and Fan Coil Units, Air Distribution to the Rooms and Back of House on Levels 1 and 1M only in the Hotel. PLUMBING : Drainage, Waste and Vent Systems including the necessary piping and distribution. Fire Fighting systems such as sprinklers and FM200 protection and LPG Systems and Steam, Vaccum, Compressed Air systems including distribution CIVIL : Stripping and clear away rubbish from Level 01 to Level 1M for the Back of House area excluding Guest Rooms, Corridors and Public Areas. Refurbishment of Staircases, Back of House Finishes which include Doors and Windows. The overall value of the civil works would not exceed 5% of the contract value and the civil works would be carried out either departmentally or through a reliable subcontractor.

S.NO. CLIENT/PROJECT BRIEF DESCRIPTION OF

PROJECT STATUS

64. Bahrain City Centre,

Bahrain Main Contractor : Cerbaco-WCT W.L.L., Bahrain Client : Majid Al Futtaim Investments L.L.C., Bahrain (Belonging to Majid Al Futtaim Group, Dubai, UAE). Consultant : Mott MacDonald, Bahrain Project Manager : MACE International Limited, Bahrain

ELECTRICAL - Complete electrical systems including incoming power service, Standby Generators, Autotransfer Switches, power distribution switchgear, Motor Control Centres, Distribution Boards, containment and cabling. ELV System like Fire Alarm and Emergency Lighting. Containment for the Specialist ELV Systems like Security, Guard Tour, PA System, Building Intercom and CCTV. ( All the above works are part of Comsip Al Ali’s scope ). MECHANICAL :- Complete HVAC Systems on the High side – 7 chillers and the Low Side including Air Handling and Fan Coil Units, Heat Exchangers, Pumps, Air Distribution to the Mall, Hotel and Gourmet tower. Smoke Management and Car park Ventilation for the Car Parking Area.

PLUMBING:- Drainage, Waste and Vent Systems including the necessary piping and distribution. Fire Fighting systems such as sprinkler and FM200 protection and LPG Systems including Storage Tanks and distribution. ELV Systems : The ELV systems, viz., BMS, Structured Cabling PA system, CCTV and Access Control and Footfall systems.

Completed

International Operations Business GroupElectro-Mechanical Division

59

International Operations Business GroupElectro-Mechanical Division

60

S.NO. CLIENT/PROJECT BRIEF DESCRIPTION OF

PROJECT STATUS

65. Movenpick Deira Hotel &

Center Residence,Dubai,UAE Main Contractor : Peremba Construction Sdn Bhd, Dubai Client : Asteco Development Management LLC , Dubai Consultant : WSP Middle East Limited, Dubai

The Broad distribution of works are as follows : ELECTRICAL: Power and all specialized ELV Systems such as Fire Alarm System, CCTV, Security & Access Control System, Telephone Data, Public Address System and Door Phone System. Apartment block has 1 No 550 KVA stand by DG set, 8 MDBs , 25 SMDBs/ ESMDBs and 2 MCCs in addition to Central Emergency Battery System, Earthing & Lightning Protection System & Aircraft Warning Lights. Provision for dedicated 1 No 250 KVA standby DG set, MDBs, SMDBs/ESMDBs and MCC are in hotel which are presently covered under provisional sum. The light fixtures are presently excluded from our scope and it would be either free issue to us by the client for installation or it may come to us as variation order. MECHANICAL: HVAC system for Apartment consist of 8 Nos X 253 TR Air Cooled Screw Chillers working in conjunction with 720 nos FCUs, 4 Air Handling units out of 2 Nos with heat recovery wheel, 10 KM of chilled water pipes and 19000 sqm of G.I and pre-insulated ducts. The Car Park has elaborate smoke extract system served by 47 Jet Fans. It would have

Completed

CO Monitoring System which is presently not covered under main contract and this would have interfacing with Building Management System which also provides controls to other A/C equipments as listed above. Provision for the dedicated 4 Nos X 253 TR Air Cooled Screw Chillers are made for the hotel block in addition to AHU/FCUs which are presently under provisional sum. PLUMBING : All External and Internal plumbing services in apartment includes 638 Water heaters, Fire Fighting Services with sprinkler system, LPG Gas System and pumps for various system. The items under plumbing for the hotel are under provisional sum. Supply of sanitary ware and accessories for the apartment as well as for hotel are under provisional sum

S.NO. CLIENT/PROJECT BRIEF DESCRIPTION OF

PROJECT STATUS

66. New Doha International

Airport, Doha, Qatar. (NDIA Pkg-19 – Emiri Terminal) Client : Govt. of Qatar, New Doha International Airport – Steering Committee Main Contractor: CDC – Takenaka JV Consultant: Overseas Bechtel Incorporated

Mechanical, Electrical & Plumbing Works for Emiri Terminal Parking Structure & Mosque of New Doha International Airport.

Completed

67. Al Udeid Air Base Pkg. 4

(Main Works), Doha - Qatar Client : Ministry of Defence, Qatar Main Contractor: Rizzani De Eccher Consultant: White Young Qatar

Design, Construction, Completion, testing and Maintenance of MEP Works and related training a;; associated with and forming part of Package 4 for Qatar Armed Forces.

Completed

68. Al Udeid Air Base Pkg. 4

– Addendum 1 Doha – Qatar Client : Ministry of Defence, Qatar Main Contractor: Rizzani De Eccher Consultant: White Young Qatar

Design, Construction, Completion, Testing and Maintenance of MEP Works.

Completed

International Operations Business GroupElectro-Mechanical Division

61

International Operations Business GroupElectro-Mechanical Division

62

S.NO. CLIENT/PROJECT BRIEF DESCRIPTION OF

PROJECT STATUS

69. Al Udeid Air Base -

Relocation Pkg. (Phase 1)

Doha – Qatar Client : Ministry of Defence, Qatar Main Contractor: Rizzani De Eccher Consultant: White Young Qatar

Design, Construction, Completion, Testing and Maintenance of MEP Works

Completed

70. Interim Doha Convention

Center, Doha, Qatar. Client : Barwa Real Estate Company Main Contractor: Amana Steel Building & Contracting Co. W.l.l. Consultant: WS Atkins

Supply, Installation Testing & Commissioning of Mechanical, Electrical & Plumbing Works.

Completed

71. Porto Arabia Parcel 14 A,

Pearl Qatar. Client : Capital Investment LLC Main Contractor: Qatari Arabian Construction Company Consultant: James Cubitt & Partners

Supply, Installation, testing & Commissioning of Mechanical (HVAC, Plumbing, Drainage, Fire Fighting & Building Management System) works.

Completed

S.NO. CLIENT/PROJECT BRIEF DESCRIPTION OF

PROJECT STATUS

72. Diwan Al Amiri, Doha

Qatar Client : Private Engineering Office, Doha, Qatar Main Contractor: Elseif Engineering Contracting Company Ltd. Consultant: Shaker Consultant Project Manager : Arab Engg.Bureau

Construction, Completion and Maintenance of MEP Works for Utility and Car Parking Building plus Relocation of Select MEP Services.

Completed

73. Barwa City Residential

Complex - Phase – 1, Doha, Qatar Client : Barwa Real Estate Company Main Contractor: Billfinger Berger Qatar W.l.l. Consultant: Maunsel Consultancy Services Limited

Supply, Installation, Testing & Commissioning of MEP works for 48 nos Type "B" (G+4, G+5 & G+6 q6 nos each) & 32 nos. Type "C" (G+1) buildings.

Completed

74. Sidra Medical &

Research Center – Qatar Foundation, Doha, Qatar. Client : Qatar Foundation Main Contractor: OHL-Contrack JV Project Manager: KEO International

Design, Engineering, Supply, Installation, Testing, Commissioning of all Mechanical, Plumbing, Fire Protections, HVAC, Medical Gas & Steam Systems and Central Plant comprising 9 nos. centrifugal chillers each of 1952 TR, Cooling towers, Pumps and associated equipment & piping system.

Under Execution

International Operations Business GroupElectro-Mechanical Division

63

S.NO. CLIENT/PROJECT BRIEF DESCRIPTION OF

PROJECT STATUS

75. Formula I Race Track, Al

Yas Island, UAE. Client : ALDAR Properties Main Contractor: CERBACO WCT WLL Consultant: HERMAN TILKE

Design, Engineering, Supply, Installation, Testing, Commissioning of all HVAC, Plumbing, Fire Protections works for motor racing circuit track.

Completed

76. Retail Development

Project, Al Yas Island, UAE. Client : ALDAR -BESIX Main Contractor: BESIX Consultant: Ian Benham

Design, Engineering, Supply, Installation, Testing, Commissioning of all HVAC, Electrical, Plumbing, Drainage, Fire Protections works for retail shopping mall, departmental stores & general strores.

Under Execution

77. Ferrari Experience, Al

Yas Island, UAE. Client : ALDAR Properties Main Contractor: BESIX Consultant: Ramboll Whitby Bird, UK

Design, Engineering, Supply, Installation, Testing, Commissioning of all HVAC, Electrical, Plumbing, Fire Protections works for Ferrari Experience.

Completed

International Operations Business GroupElectro-Mechanical Division

64

International Operations Business GroupElectro-Mechanical Division

65

S.NO. CLIENT/PROJECT BRIEF DESCRIPTION OF

PROJECT STATUS

78. Palm Oceana Movenpick

Hotel, Dubai, UAE. Client : ASTECO Development Main Contractor: Dhabi Contracting Consultant: Dar Al Handasaah

Supply, Installation, Testing, Commissioning of all HVAC, Electrical, Plumbing, Fire Protections works for Movenpick Hotel Building.

Completed

79. Ettihad Towers, Abu

Dhabi, UAE. Client : H.H. Sheikh Suroor Bin Moh’d Al Nahyan Project Department Main Contractor: Arabian Construction Company LLC (ACC), Abu Dhabi Consultant: Cansult Limited, Abu Dhabi Project Manager : Hill International, Abu Dhabi

Supply, Installation, Testing, Commissioning of all HVAC, Electrical, Plumbing, Fire Protections works for Ettihad Tower Building. The above project is a mixed-use development, consisting of hotel, retail, residential, commercial and car park (see below for an area break up). The development consists of four basement car park levels, five podium levels accommodating retail and restaurant units, a business centre and ball room. On top of this are 3 Towers (Tower 1- Hotel & Service apartments, Tower 2- Residential, Tower – 3 Office Block)

Completed

S.NO. CLIENT/PROJECT BRIEF DESCRIPTION OF

PROJECT STATUS

80. District Cooling Plant

Project at Dubai International Financial Centre (DIFC),Dubai, UAE Client : Emirates Central Cooling Systems Corporation, Government of Dubai, known as EMPOWER Main Contractor : Voltas is the Main Contractor and has tied up with CSHK Dubai Contracting LLC, Dubai as Subcontractor for Civil Works. Consultant : 1. Ellerbe Becket Inc. -

Engineer for Process Plant

2. Tebodin Middle East – Engineer for Civil and Building Services, and also the Lead Engineer

The DIFC North DCP is located in Dubai International Financial City Area, Dubai, behind the Emirates Towers, off Sheikh Zayed Road. The purpose of this plant is to produce chilled water which would cater to buildings coming up in the Financial City. The total built-up area consisting of B+G+M+1+Roof is approx. 26,915 sq. mtrs EMD is the Main Contractor for construction of this plant. Apart from MEP works, Civil Works is also included in our scope, for which we have been associated with China State (HK) Dubai Contracting (LLC), Dubai. The project has 2 phases. Phase 1- to be completed in 301 days from the commencement date. Phase 2 - to be completed within 365 days from the commencement date. Civil: The structure consists of Basement + Ground + Mezzanine + 1st Floor + Roof. HVAC: To provide Chilled water plant of capacity 21,430 TR in Phase 1 and again 21,430 TR in Phase 2. Our Scope consists of supply to site, installation, testing, commissioning and handover of the following systems:-

Completed

International Operations Business GroupElectro-Mechanical Division

66

Cooling Towers, Primary Chilled Water Pumps, Condenser water pumps, Full Flow Separators- 20 nos. each Secondary Chilled Water Pumps - 7no. Expansion Tanks- 2 no. Air Compressors – 2 no. Pipes, fittings & valves for Chilled water system, condenser water system, chemical feed system, compressed air system, refrigerant recovery system and refrigerant vent piping system. Air-conditioning system for Plant comprising of AHUs, FCUs, pumps, pipe works, duct work, air outlets etc. Electrical: Supply, installation, testing and commissioning of the following systems:- Medium Voltage 11KV Panels for Primary Distribution, 3.3 KV Switchgear Panels feeding 20 chillers (current scope). • 11/3.3KV Transformers for

Power distribution to 3.3KV Rated Chillers, and 11KV/400V Transformers for Miscellaneous loads and Building Services.

• Low Voltage distribution consisting of Low Voltage Switchgear Panels (MDB, SMDB, FDB, MCC, VFD, Cap banks) small Power and lighting installation.

• PLC-SCADA System, Building Automation system for Central Plant control and provisional quantities for ETS.

• SCADA controls for Electrical Distribution System.

• 3.3KV, 2500KVA, 2 nos. D.G. Sets along with Synchronizing panel.

• 40KVA UPS. • 11KV & 3.3KV Medium

Voltage Cables. • Low Voltage Cables. • Cable Trays & Trunking. • Busbar Trunking. • Earthing & Lightning

protection • Light Fixtures, Self

contained Battery backup emergency Lighting Installations.

• Fire alarm System. • Telephone/Data System. • Wiring accessories. • LED Display Board. Plumbing & Fire Fighting: The scope includes plumbing services (water supply, drainage); make up water for CHW Plant, Blow Down system, etc. Our scope in fire fighting and fire suppression system includes Oxygen reduction system, Sprinkler system and Deluge Spray system for Cooling Towers.

S.NO. CLIENT/PROJECT BRIEF DESCRIPTION OF

PROJECT STATUS

81. Queen Mary - II, France Main Contractor : Alstom, France (Chantiers de L’atlantique

Queen Mary 2 is a luxury Cruise Liner having ultra modern facilities equivalent to seven star hotels with dimension of 346 Meter ( L ) x 45 Meter (W) x 52 Meter (H). This Cruise Liner comprises various areas such as suites, deluxe & standard passenger cabins, restaurants offering international cuisine, lounges, meeting rooms, library, shopping centre, bars, casino, lidos, Carolina, laundry, hospital, swimming pools, gymnasium, health spa and various types of games including golf. The Cruise Liner is divided into 9 fire zones to take utmost care of safety and 15 levels of deck. Gross cooling, pre-heating and re-heating requirement for the Cruise Liner will be 26500 KW, 3300 KW & 4800 KW respectively. Our work comprises basic and detailed designing, supply, installation, testing & commissioning of the HVAC system and electrical works in 31 Nos. Plant Rooms. There will be 135 Air Handling Units which will be working in conjunction with heat recovery wheel and variable frequency drives, 1290 Fan Coil Units, Pumps & heat exchangers for chilled & hot water circuit, piping & interconnecting valves for carrying refrigerant, steam, condensate, sea water, chilled & hot water. A total quantity of 850 Metric Tons of ducts which also includes stainless steel ducts, 80000 sq. meters of fibre glass insulation, networking equipment i.e fire dampers, volume control dampers, shut off dampers,

Completed

International Operations Business GroupElectro-Mechanical Division

67

sound attenuators & grilles/diffusers etc. Automatic Control System to provide all control, monitoring and alarm functions for HVAC system. This will have software interfacing with Integrated Automatic Control System of Cruise Liner, which will be PLC controlled. The complete system has been designed to meet SOLAS standards.

82 Balaclava Resort Mauritius Customer : Lateral Holdings

Lateral Holdings Ltd Consultant : John Mech-El Technologies (P) Ltd Main Contractor : China Jiangsu International Project Manager : Subraconsult Ltd,

Supply, Installation, Testing and Commissioning of MEP systems for 210 room beach resort

Completed

S.NO. CLIENT/PROJECT BRIEF DESCRIPTION OF

PROJECT STATUS

83 Apollo Bramwell Hospital, Mauritius Client : British American Hospital Enterprise Ltd (BAHEL) Main Contractor : IREKO Design & Construction Consultant : Pro-Design Engg.Consultants Project Manager : Nazeebun Project Consultants Ltd

MEP Works for 200 bed multi-specialty hospital.

Completed

International Operations Business GroupElectro-Mechanical Division

68

S.NO. CLIENT/PROJECT BRIEF DESCRIPTION OF

PROJECT STATUS

84 District Cooling Plant at Resort World at Sentosa, Singapore. Main Contractor: Voltas Ltd Consultant : Meinhardt (Singapore) Pte Ltd. Client: Resort World at Sentosa Pte Ltd.

The work comprises the Engineering, Procurement and Construction (EPC) of a District Cooling Plant. The equipment comprises of 5 Nos. water cooled centrifugal chillers each of capacity 3000 TR with necessary CHW & CW Pumps, Piping, forced induced Draft Cooling Towers, Thermal Energy Storage Tanks, PLC, building Management Controls,6 Nos. 6.6KV Panel, MCC 2 Nos. 2 Nos.2.25 MVA, 2 Nos.4 MVA Transformers, HV/LV Power Distribution, etc.

Completed

85 Link Chamber Cooling water pipework and Heat Exchangers –an Infrstructure project at Marina Bay Sands Integrated resorts, Singapore. Main Contractor:

Voltas Ltd, Singapore MEP Consultant : Parsons Brinckerhoff, Singapore Cost Consultant: Rider Levett Bucknall(RLB), Singapore Client: Marina Bay Sands Pte Ltd, Singapore

An MEP infrastructure work in the Tunnel interconnecting various facilities for the Integrated resort comprising of a 3- storey Museum, a 5 storey podium complex comprising of MICE, Casino, Theatre, retail &basement carpark, 3 blocks of 57 –storey Hotel Development with Skypark , 5 basements of car park. Major items include large size pipe work of size 1400 mm dia. 23 nos of large size Plate Type Heat exchangers, Tunnel ventilation fans and related Electrical, Plumbing &Sanitary work required for the tunnel linking the various facilities indicated above..

Completed

International Operations Business GroupElectro-Mechanical Division

69

International Operations Business Group 70 Electro-Mechanical Division

S.NO. CLIENT/PROJECT BRIEF DESCRIPTION OF

PROJECT STATUS

86 Qatar Handball Association Complex. Main Contractor:

Redco Al Mana MEP Consultant : WSP / Shaker Project Manager: Hill International Client: Private Engineering Office

The main handball court will be for a minimum seating capacity of 5000 spectators in addition to 350 seats for VIP, with VVIP box to occupy minimum 25 seats, for a total of 5350 seats. The additional two complete size handball courts will be used for training and local tournament, small events and should be connected to the main handball court The main hall will be equipped with all necessary infrastructure for broadcasting according to the Al Jazeera and Alkas requirements also it will have minimum of 2 (two) multimedia score boards as per the IHF and QHF requirements. Voltas Scope includes complete Electromechanical Works including Chiller Plant, Substations and Specialist systems including Media Package, Score Boards, CCTV, Security and Access Control System, BMS, Audio Visual & PA systems and other ELV systems.

Under Execution

International Operations Business Group 71 Electro-Mechanical Division

S.NO. CLIENT/PROJECT BRIEF DESCRIPTION OF

PROJECT STATUS

87 Workers' Hospital and Integrated Health Centre. Main Contractor:

Midmac WLL. MEP Consultant : Gharnata / Farrow / Jain / DAR Al Handasah Project Manager: Hill International Client: Private Engineering Office

The Workers' Hospital and Integrated Health Centre is a healthcare project comprising of a 120 bed (with a ability to expand up to 200 beds and related clinical areas at a future date). Workers Hospital comprise of B+G+3 (Including rooftop mechanical), Integrated health Centre B+G+1 (Including rooftop mechanical), Canteen, Washroom, Mosque and a Central Utility Plant. Voltas scope includes complete Electromechanical Works including Chiller Plant Substations, HV & LV Network, External utilities, Sewage Treatment Plant etc. Scope also includes all ELV systems and specialist systems such as Medical Gas System, Nurse Call System, Master Clock System, Steam System & Pneumatic Tube System.

Under Execution

Major Projects executed / under execution

Name of the Project

Scope of

Work

Value in US$ @

Approx.

Status

Palaces

1. Palace of His Majesty, Sultan Qaboos Bin Said, Muscat, Sultanate of Oman.

M 1.0 Mio. Completed

2. New Villa for H.H. The Crown Prince at

Bateen Palace, Abu Dhabi, UAEMEP 3.5 Mio. Completed

Hotels & Resorts

1. Yak & Yeti Hotel, Nepal M&E - Completed

2. Taj Sheeba Hotel, Sanaa, Yemen Arab Republic

M&E 5.0 Mio. Completed

3. Hotel at Samarkand in Uzbekistan M 1.6 Mio. Completed

4. Hotel at Bukhara in Uzbekistan M 1.4 Mio. Completed

5. Hotel at Tashkent in Uzbekistan M&E 3.2 Mio. Completed

6. SAARC Complex, Thimphu, Bhutan M&E 1.0 Mio. Completed

7. Refurbishment of Intercontinental Hotel, Abu Dhabi, UAE

E&P 2.0 Mio. Completed

8. Central Plant & Infrastructure Facilities

for Emirates Palace Hotel Complex (Package 8), Abu Dhabi

MEP & Civil

55 Mio. Completed

9. East Wing & West Wing Hotel Towers

(Package 10A) – Part of Emirates Palace Hotel Complex, Abu Dhabi, UAE

MEP 45.8 Mio. Completed

10. Mall of Emirates Hotel, Dubai, UAE MEP 8.15 Mio. Completed

11. Wafi Hotel & Mall, Dubai, UAE MEP 28.77

Mio. Completed

International Operations Business GroupElectro-Mechanical Division

18

Name of the Project

Scope of

Work

Value in US$ @

Approx.

Status

12. Balaclava Resort, Mauritius MEP 6.7 Mio. Completed

13. Movenpick Deira Hotel & Center Residence,Dubai,UAE

MEP 22.00 Mio.

Completed

14. Refurbishment of Intercontinental Hotel,

Abu Dhabi, UAE MEP 23.00

Mio. Completed

15. Palm Oceana Movenpick Hotel, Dubai. MEP - Completed

16. Bahrain City Center Hotel MEP 41.09 Completed Mio. 17. Dahlak Island Resort, Eritria MEP 10.00 Completed

Mio.

Airports (International)

1. Bahrain International Airport, Bahrain M&P 25.0 Mio. Completed

2. Al Ain International Airport, Al Ain, UAE M&P 6.0 Mio. Completed

3. New Hong Kong International Airport at Chek Lap Kok, Hong Kong

MEP (Part)

40.0 Mio. Completed

4. Extension to New Hong Kong

International Airport at Chek Lap Kok, Hong Kong

MEP 20.0 Mio. Completed

5. Male International Airport, Maldives MEP 3.9 Mio. Completed

6. New Doha International Airport, Emiri Terminal, Doha

E&P 41.00 Mio.

Completed

7. Hyderabad International Airport Ltd,

Hyderabad, India MEP 31.00

Mio. Completed

International Operations Business GroupElectro-Mechanical Division

19

Name of the Project

Scope of

Work

Value in US$ @

Approx.

Status

Hospitals

1. Shaikh Khalifa Medical Centre, Abu Dhabi, UAE

MEP 25.0 Mio. Completed

2. VIP Wing for Mafraq Hospital, Abu

Dhabi, UAE MEP 4.0 Mio. Completed

3. 120 Bed Hospital, Ghat, Libya M 2.0 Mio. Completed

4. Sidra Medical & Research Center – Qatar Foundation, Doha, Qatar.

M&P 213.70 Mio.

Under Execution

5. Workers Hospital & Integrated Health

Centre, Industrial Area, Doha, Qatar MEP 65.0 Mio Under

Execution

6. Apollo Hospital, Mauritius MEP 11.66 Mio.

Completed

7. Dar Al Amal Hospital, Riyadh, kSA E - Completed

Railways

1. Samawa Railway Project, Iraq M 3.5 Mio. Completed

2. Saudi Railway Workshop, Dammam, Saudi Arabia

E 1.8 Mio. Completed

3. KCRC – West Rail Station at Siu Hong

& Tuen Mun M&P 10.5 Mio. Completed

4. NDIA – PRSSB Station Box MEP 3.0 Mio. Completed

Textiles

1. Ubungo Textile Mills, Tanzania M&E 3.0 Mio. Completed

Value in US $ Approx.

Status

International Operations Business GroupElectro-Mechanical Division

20

Name of the Project

Scope of

Work

Value in US$ @

Approx.

Status

2. P.T.Sumatex, Indonesia (Textile Mill) E&E 10.0 Mio. Completed

3. Tasmania Paper & Pulp Mill, New Zealand

A 0.6 Mio. Completed

4. Kwality Textiles, Malaysia M - Completed

5. R.M.Spinning Mills Dhaka, Bangladesh M - Completed

6. Polytex Yarn Products, Chittagong, Bangladesh

M - Completed

Commercial, Shopping & Office Complexes

1 Abu Dhabi Mall, UAE E 17.5 Mio. Completed

2. Director General of Police Headquarters, Iraq

M 2.5 Mio. Completed

3. Madinat Zayed Shopping Centre, Abu

Dhabi, UAE MEP 12.0 Mio Completed

4. ETISALAT Telecom &

Admn.Bldg.,Sharjah, UAE MEP 12.0 Mio. Completed

5. Al Masaood Tower, Abu Dhabi, UAE M&E 2.8 Mio. Completed

6. Marina Mall Extension, Abu Dhabi, UAE MEP 13.5 Mio. Completed

7. Mall Of Emirates, Dubai, UAE MEP 17.0 Mio. Completed

8. Villaggio Retail, Sports & Entertainment Centre, Doha, Qatar

MEP 32.88 Mio.

Completed

9. Interim Doha Convention Center, Doha,

Qatar MEP 17.88

Mio. Completed

10. Bahrain City Centre, Bahrain MEP 128.76

Mio. Completed

International Operations Business GroupElectro-Mechanical Division

21

Name of the Project

Scope of

Work

Value in US$ @

Approx.

Status

11. Ferrari Experience, Al Yas Island, UAE MEP 151.00 Mio

Completed

12. Doha Land Phase 1A , Qatar MEP 54.00 Under

Mio Execution 13. Yas Retail Mall , UAE MEP 98.6 Under Mio Execution 14. Zikreet Office Building at Ras Laffan, HVAC 3.2 Completed Ras Gas, Qatar Mio

District Cooling Plants / Central Plants

1. 2900 TR Cooling Plant at Al Jimi, Al Ain, UAE

M&E 3.6 Mio. Completed

2. 7500 TR Cooling Plant at Muroor Road,

Abu Dhabi, UAE MEP 5.9 Mio. Completed

3. 7500 TR Cooling Plant at Shaikh Zayed

Sports City, Abu Dhabi, UAE MEP 5.9 Mio. Completed

4. 12000 TR Cooling Plant at Resort World

of Sentosa, Singapore MEP 37 Mio. Completed

5. DIFC North Plant, Dubai, UAE M&E 71.23

Mio

Completed

6. Diwan Al Amiri, Doha, Qatar MEP 21.65 Mio

Completed

Techno Parks, Research & Training Centre

1. Cyberport Development, Hong Kong M&P 13 Mio. Completed

2. Technical Training Centre, Baghdad, Iraq

M&E 2.35 Mio. Completed

3. Scientific Research Centre, Baghdad,

Iraq M 1.8 Mio. Completed

4. Water Research Centre, Baghdad, Iraq M 2.15 Mio. Completed

5. Science Park Building, Hong Kong M&P 4.75 Mio. Completed

International Operations Business GroupElectro-Mechanical Division

22

Name of the Project

Scope of

Work

Value in US$ @

Approx.

Status

Infrastructure Projects

1. Link Chamber Cooling Water Pipe Work & Heat Exchangers at Marina Bay Sands Integrated Resorts, Singapore

MEP 13.74 Mio.

Completed

High Rise Towers

1. Jumeirah Beach Residence 4, Dubai, UAE

MEP 45.2 Mio. Completed

2. Burj Tower, Dubai, UAE MEP 133.50

Mio. (JV 356.1 Mio.)

Completed

3. Porto Arabia Parcel 14 A, Pearl Qatar. M 9.59 Mio. Completed

4. Etihad Towers, Abu Dhabi, UAE MEP 87 Mio. Completed

5. Central Market Development, Abu Dhabi MEP 184.00 Under Mio Execution 6. Emirates Pearl Tower MEP 46.57 Completed Mio

1

Power Stations

1. Katunayake Airport Substation, Sri Lanka

M&E - Completed

2. Cylon Minaral Sands Substation, Sri

Lanka M&E - Completed

3. Al Taweelah (Phase B) Power Station,

Abu Dhabi, UAE M 6.0 Mio. Completed

4. Tripoli West Power Station, Libya M 1.6 Mio. Completed

International Operations Business GroupElectro-Mechanical Division

23

Name of the Project

Scope of

Work

Value in US$ @

Approx.

Status

5. Western Mountain GTPP, Libya (BHEL) M - Completed

6. Tenaga Nasional BHD Power Station, Malaysia (BHEL)

M - Completed

Defence

1. Ministry of Interior, Housing Project, Tabuk, Saudi Arabia

MEP 32.0 Mio. Completed

2. Al Udeid Air Base-Pkg-4, Qatar MEP 47.0 Mio. Completed

3.. Al Udeid Air Base Pkg. 4 –

Addendum 1, Doha, Qatar.MEP 7.05 Mio. Completed

4. Al Udeid Air Base – Relocation Pkg.

(Phase 1), Doha, Qatar.

MEP 39.21 Mio.

Completed

Waste Water Treatment

1. Changi Water Treatment Plant, Singapore

S 68 Mio. Completed

International Operations Business GroupElectro-Mechanical Division

24

Name of the Project

Scope of

Work

Value in US$ @

Approx.

Status

Cruise Liner

1. Queen Mary-II (in JV) M 45 Mio. Completed

Pharmaceutical & Other Industries

1. Capsulation Project, Moscow, Russia

M - Completed

2. Pharmaceutical Factory, Minsk,

Belarus – CIS M - Completed

3. Ajanta Pharma, Termez, Uzbekistan M - Completed

4. Ajanta Pharma, Dushanbe,

Tajikistan M - Completed

5. Walls Ceylon Ice Cream Factory, Sri

Lanka M&E - Completed

6. Farm Dew Mushroom Growing

Plant, Kenya M - Completed

7. Semiconductor Facility, North Korea M&E - Completed

Others

1. Car Parking Structure, Abu Dhabi MEP 2.0 Mio. Completed

2. Barwa City Residential Complex – Phase – 1, Doha, Qatar

MEP 135.75 Mio.

Completed

3. Formula I Race Track, Al Yas Island,

UAE MEP 123.80

Mio Completed

International Operations Business GroupElectro-Mechanical Division

25

4. Qatar Handball Association Complex MEP 47.95 Mio

Under Execution

……………………………………………………………………………………………… Note : Status indicated is as on 1st May’ 2010

International Operations Business GroupElectro-Mechanical Division

26

M - Mechanical (HVAC & other mechanical Services)

E - Electrical (HV/LV/Power Distribution, Lighting, ELV,BMS & Specialized Systems)

P - Public Health & Safety S - Sewage