office of the executive engineer highways division sukkur
-
Upload
khangminh22 -
Category
Documents
-
view
2 -
download
0
Transcript of office of the executive engineer highways division sukkur
are ubmitted for
EXECUT HIG
EER DIVISION
UKKUR
OFFICE OF THE EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
NO. EE/HW-D/TC/ t974, 2018 SUKKUR DATED. c2 /O/2018
'To,
The Director (A&F), Sindh Public Procurement Regulatory Authority, Karachi.
SUBJECT:- REQUEST FOR HOISTING OF BID EVALUATION REPORT NIT NO. EE/HW-D/TC/503 DATED. 04.12.2017 AT SPPRA ID NO:2 147483647 S.NO. 35535 DATED: 05-12-20 17
The Bid Evaluation Report impartial duly signed by 03
Members of Procurement Committee with Original Comparative
Statement, Minutes of opening bid meeting, Bidders Qualification!
Technical Evaluation Report attendance s
information please.
ILO
OFFICE OF THE EXECUTWE ENGINEER HIGHWAYS DIVISION SUKKUR
NO. EE/HW-D/TC/ 201 SUKKUR DTAED. 1/ /C//2Ol
CORRIGENDUM
Please refer to the NIT issued by this office vide this
office letter No. EE/HW-D/TC/ 503 dated. 04.12.2017 published in
various daily newspaper as well as hoisted on SPPRA website the
period of bid validity referred in bidding data is treated as 90 days.
All the other terms and condition will remain as same.
EXECUTIVE ENGINEER HIGHWAYS DIVISION
SUKKUR Copy submitted with compliments to: -
1. The Worthy Deputy Commissioner, Sukkur.
2. The Secretary, Information Technology, and Government of Sindh Secretariat No: 6, @ Karachi, along with copies of N.I.T's for favour of information and placing them on the web site of Sindh ,.._ Government.
3. The Director (A&F) SPPRA 3-15 Government of Sindh, Public Procurement Regulatory Authority , Planning & Development Department Karachi along with Soft & Hard copy of NIT for favour of information and placement on Web Site.
4. The Director, Information (Advertisement) Public Relation Advertising Department Karachi, for publication in 3 Nos. leading Newspaper "Sindhi" , Urdu & English" (Kawaish, Jung, Down).
5. The Superintending Engineer, Works & Services, Sukkur, for favour of information.
6. The Executive Engineer, (Buildings / Education Works) Department Sukkur, for information for wide publicity.
7. Copy to notice board and drawing branch / HC (Local).
C
EXECUTIVE ENGIER HIGHWAYS DIVISION
SUKKUR
Q'•'r *4 U 'I 1 F i(IW'v' I, '.
- I
-U - C(- C lH '- ' U:- 'I''''- H
1 )H
i.1igbi1ity \I. lIRU- PH'KH tC1Ii
vi;UF 201 '1 •in- I I I (:t vr t t:t . tSpec • 'h Hp\11 u:1 U - -i' -.';iOi
i-; I r1 -fl 10- Cl 1(IUI(I Ut' i H
-; C I' IhI' Uph H "CR - - rt 'LU
QU Al JF1CAT1ON
-'CI I';HH 1.
H -- C_ - U
- 'iI
I 1 - ;-
C :1
h1eth)d of Prof tlr( rn ot
13 tdcuing / Tvn d ii
H1'! U- C C
d 1- I O1U' HL IIt
.' 0i' "
H'- CW C. C
'U l.
Cd
tIlIC tI HI CSUWUCL
OH('C LJUH 1 1 (11I
;t. .
dC'
'I'.C'1 \\
jul ,'_11 IuI\It)I
_\ u I \I0
I U I
j)UtCt(CLC('1I Ct
I I tt1411 Tcflt
CO•
)-0(
-' (C HI -
. -1-.L
j )i: tniri
LTau1 nI IcI , ftr pubini Hd1u Uiui ;"
/
IiTGIJpy D7j
1 S1I d j')1Imtto
i';j 111 1-
I u J(.! (': :,f S;r. U ( I c
I. IiI jlf 1,1 ('
ii .1
I \Y I'HA 1 - ifl A',y
k Ii IIi ''tI1
uioi nd 1Il;II IIni 1I Ij.1
kkur/ I<oifl / ; t Aii lot iI'O[
EXECUTiVE INGtNE hIGHWAYS DWISl
I -*
I k P1
IhM l
t)c1 i•or • \1L
1tjOH H I 'i
H dl I l\ l I C
JI
RLs
jd i !3 uUH
0O0
ui H
Wage Qdii I1T L;
'h: ikh
Cxnst: of road iOU ii t 3 H H
Wian Ho H1Vj1!(, O/OU/ 3
ibi11t1()ll & J( loi HI IH Hi I Iih
o' Ii H10 i1 i
U1! AIU]lWflfl1Hd K lU1hH1 Mik 0/
HI IKh ilit u
k
3000
14
I Ni
I I kin . He ft
m ill i
Ii Ii \I III
1 I I F
}J) 1.141
I I 1.. i4( 4ThI
t . IIh
N Th I H t 11
ii 1W 1 H t)
fkl "
IIi (Il
N 1 I
L
1 tion 4
41
,..1 .r¶)I :ril 4',_ fl l, i i (jQJt I
• .1)N(U( It ii .4
•'1ii \Ju1,5,Uu1 hi iIs ,i
I IiCJii! \ii; 43/ () i)j
I: hit.
in 1 • 'i' .4 I I H . 1
IIUI II io:4J 1114.1W liiI'k' N
•'i1 iftR1 Lu iuLJi Li4H1)In 11111
N
EXECUTIVE EINEER HWAYS DiV
The lJi:,'to t1lj iL I ft
t
13JF(' )T t 10N 01 1L 1W)/ / 1i\jj ).(M. I 2.:20 1'?,
I yi If'wH (1(htf
N I T SU 13 M S Si ON (I
S AU, Documents Reqtircd with NIT:
EX FCUTIVE EIGINEER
1IGIVJAYSD
U 1 L cr
C 'i I
OFFICE OP THE DEPUTY COMMI$$JONER/PL)
$UKKUR No.DC/Suk-Dev/2013-14J- Sukkur, dated'-3-2i4
RUER
In pursuance of Rule 31 of Sindh Public Procurement Regulatory Authority Rules 2010, thc
dressa! of Grievances and settlement of Dispute Committec° is hereby constituted in the Works &
Srvces Department Sukkur (Projects of District Development portfolios) with following composition:
S.No. Designation Position held
Superintending Engineer Works & Services Sukkur Chairman
2 District Accounts Officer Sukkur
3 Additional Deputy Commissioner-Il of Deputy Commissioner Office Sukkur
Member
Member
Member
Mn )e
4 Executive Engineer Provincial Highway Division Sukkur
S Executive Engineer of the Division concerned
TERMS OF REFERENCE:
The Committee will hear the complaints of bidders against the decisions of piocurin agency.
ii) Prohibit the procurement committee from acting or deciding in a manner, inconsistent wh these rules and regulations;
iii Annual in whokorinparcar.yunaithcried o decision of the pwcercment comnii:te. and
iv) Recommend to the Head of Department that the case be declared a mis-procuremelu if
material violation of Act, Rules, Regulations, orders, instructions or any other law relating 10
public procurement, has been established. v) Reverse any decision of the Procurement Committee or substitute its own decision for such
a decision provided that the complaint Redressal Committee shall not make any decision to award the contract.
vil The Complaint Redressol Committee shall announce its decision within seven days alit!
intimate the same to the bidder and the authority within 3 working days.
/
(SHAHZAD TAHIR THAHEEM)
DEPUTY COMMISSIONER/PD
SUKKUR
Copy fwd: for information to:
1. The Superintending Engineer Works & Services Sukkur,
2. The District Accounts Officer Sukkur
3. The Additionol Deputy Commissioner-li Sukkur
4. The Executive Engineer Provpthl Highways Division. Sukkur
5. The Executive Engineer Higi1"ways/Buiidings/Education Works & Public HethlEngineering Divisions, 5ukkur.
DEPUTh COMMkSStONER/PD 4JJ KK1 R
Execulive Engineer, Highways Division, Sukkw
Assistant Engineer, Highways Sub-Division, Rohri
Assistant Engineer, Public Health Engineering Sub-Division, Rohri
Chairman
Member
Member
2. The Functions & Responsibilities of the Committee will be same as specified in Rule- 7
& So! Sindh Public Procurement Rtiles-2010.
GOVERNMENT OF SINOH WORKS sSERVICES IJEPARTMENT
Karachi dak'd 2S November, 2016.
NO TIFICA i'ION
No.E&A(W&S)3-9/2014 (Sukkur) : in partial modification of this Department's Notification of oven
number dated 02-07-2013 and with the approval of Competent Authority, Procurement Committee, in
terms 01 Ru!e-7 of Sindh Public Procurement Rules-2010 (Amended 2013), is hereby constituiud fo
procurement of Goods / Work? in the Office of Executive Engineer, Hiqhways Division, Sukkur
excluding, procurement involving foreign exchange, with the following cornposition:-
SECRETARY TO GOVT. OF SINDH
No.E&A(W&S)3-9/2014 (Sukkur) Karachi, dated the 28th November, 2016.
A copy is (oswarded for information to:-
1. The Accountant General, Sindh, Karachi. 2. The Managing Director, SPPRA, Karachi. 3. The Chief Engineer (Highways), Sukkur 4. The Chairman /Members of the Committee. 5. The Deputy Director (Monitoring), PM&E Cell, W&SD. 6. PS to Minister, Works & Services Sindh. 7. PS to Secretaiy, W&S Department 8. Notification file.
SECTION OFPCEW(GENERAL) FOR SECRETARY TO GOVT. OF S!NDH
S NIT NO. EE/HW-D/TC/ 503 DATED. 09. 12.2017
- METHOD AND PROCEDURE OF NATIONAL COMPETITIVE BIDDING PROCUREMENT (SINGLE STAGE-ONE ENVELOPE)
MINUTES OF BID OPENING MEETING
A meeting of the procurement committee of this department was held on
dated. 22.12.2017 for opening the bids received in respect of subject NIT: the deadline of
supervision the meeting was attended by all following members of the procurement
committee and the representative of bidders (Attendance sheet is enclosed).
The bids were opened at 02:00 PM in the presence of the above
mentioned participants and the rates quoted by bidders were read aloud and encircled by
Chairman of the Procurement Committee. All the members of the procurement committee
signed on each and every page of financial proposal /bids. The bids does not contain any
over-writing or cutting (and mention cutting or over-writing if any), following are the details
of bids announced.
The committee shall examine all the bids as per the Qualification/
eligibility criteria provided in the bidding documents arithmetical checks and verify the
documents and bid security submitted by the bidders.
The meeting ended with the note of thanks to from the chair.
IRAFIQUE AHED SHAIIU{) EXECUT1Y ENGUEER HIGHWAYS DIVISION
SIJKKIJR
(WAHEW BUX ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION RORRI
(ABDUL ASSISTANT E GINER
PUBLIC HEALTH E!jGUBDIVISION Rd
:} k)2
.4
• . . .- .
n - 'L T11L
11 _.ta •Jv ,t/ .
--::,
U)
.—',Jij .'
I/
ç.:i( ;
V1'f-:', F
'
. - ,. -, .. - '.
1 t.• . .'- t•- -.
." . . . .;__ .. I - - 1- .. .- I . . ',
tl
1
S ATTENDANCE SHEET OF PARTICIPATION IN TENDER PROCESS IN 4 EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
NAME OF WORK: - CONSTRUCTION OF ROAD FROM NATIONAL HIGHWAY TO VILLAGE BHAI KHAN GHANGHRO MILE 0/0-0/3+330' (1.60KM).
EXECUTWE ENGINEER HIGHWAYS DIVISION SUKKUR HELD ON 22.12.2017
SR. NO.
NAME OF CONTRACTOR SIGNATURE
1 M/S RAVI KUMAR ENTERPRISES
N
7- 2 M/S SUKKUR CONSTRUCTION COMPANY
I
CHAIRMAN
(RAFIQUE AHMED SjIAIKH) EXECUTIVE ENGINEER
HIGHWAYS DIVISION SUKKUR
MEMBER MEMBER
441 (WAHEED BUX QASMI) ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION ROHRI
4 (ABDUL HAFE Z MEMON] ASSISTANT ENGINEER
PUBLIC HEALTH ENGG: SUB-DIVISION ROHRI
S ID EVALUTION REPORT
1 Name of Procuring Agency Executive Engineer Highways Division Sukkur
2 Tender Reference No. N.l.T No. EE/HW-D/TC/ 503 Dated. 04.12.2017
3 Tender Description/ Name of Work/ Item CONSTRUCTION OF ROAD FROM NATIONAL HIGHWAY TO VILLAGE BHAI KHAN GHANGHRO MILE 0/0-0/3+330 (1.60KM).
4 Method of Procurement Single Stage (By Competitive Rate! Bid)
5 Tender Published Published in (i)Daily Awami Awaz Karachi Dated. 07.12.2017 (ii) Daily Express Karachi Dated. 07. 12.2017 (iii) Daily Dawn Karachi Dated. 07.12.2017 (iv) Daily Sobh Karachi Dated. 07. 12.20 17
SPPRA ID NO:2 147483647 S.No. 35535 Dated: 05-12-2017
6 Total Document Sold 02 Nos.
7 Total Bids Received 02 Nos.
8 Technical Bid Opening Date (If Anolicable)
--
9 No of Bid Technically Qualified (If Applicable)
01 No.
10 Bids Rejected 01 Nos.
11 Financial Bid Opening Date 22.12.2017
BID EVALUATION REPORT
COST RANKING IN COMPARISON REASONS FOR SR # NAME OF FIRM OF BIDDER OFFERED BY TERMS OF WITH ESTIMATE ACCEPTANCE/ REMARKS
- THE BIDDER COST COST (SAVING) REJECTION
I M/S RAVI KUMAR ENTERPRISES
5816304 1 Lowest 151696 Accepted Being Lowest
2 M/S SUKKUR CONSTRUCTION COMPANY
5865596 2h1 Higher 102404 1ejcctcc1 Being Higher
SIGNATURE OF THE TENDERING COMMITTEE.
CHAIRMAN
(RAFIQUE AHMED EXECUTIVE EGNEER
HIGHWAYS DIVISION SUKKUR
MEMBER
'I A'
MEMBER
(WAHEED Bt1 Q'SMI) (ABDUL HA?EEZ MEMON) ASSISTANT ENGthEER ASSISTANT4OINEER
HIGHWAYS SUB-DIVISION PUBLIC HEALTH E1GG: SUB-DIVISION ROHRI ROHRI
I
PART "B" 190833 189466 191378
GRAND TOTAL A, B: - 5856689 5816304 5865596
ADD: CONTIGENCY (LUM-STJM) 111483
The Lowest Rates Qouted By M/S RAVI KUMAR ENTERPRISES Government Contractor are:-
PART "A" (11 Rs. 7.30% Above (Rupees Seven Point Thirty Percent Above) PART "B" @ Rs. 10% Above (Rupees Ten Percent Above)
Lowest Rates are Recommended for Approval
(A) Total Cost as per Estimate 5968000 (B) Total as per Tender 5816304
Saving (A+B) 151696 Percentage Saving 2.54
A.A Amount 6000000 Lowest Tender Amount 5816304
Saving Over A.A 183696
NAME OF WORK: -
FINANCIAL REVIEW 1 COMPARATIVE STATEMNT
CONSTRUCTION OF ROAD FROM NATIONAL HIGHWAY TO VILLAGE BHAI KHAN GHANGHRO MILE 0/0-0/3+330' (1.60KM).
SR NO
DESCRIPTION ESTIMATE
M/S RAW KUMAR ENTERPRISES
_______ MIS SUKKUR CONSTRUCTION COMPANY
RATE AMOUNT RATE AMOUNT
PART "A" (ROAD WORK 1 AmountofSchcdule'B 5574160 5574160 5574160
2 Add: 8% Above () 445932 7.30% Above (+) 406914 8.15% Above (+) 454294
3 Ded: Diff Cost of Bitumen (-1 354236 354236 354236
PART "A" 5665856 5626838 5674218 PART "B" 13' SPAN CULVERTS
I Amount of Schedule B" 172242 172242 172242
2 Permium -- 10% Above (4-) 17224 11.11% Above(+) 19136
3 Add: Cartagc of Material (+) 18591
RiED AS
BDULHAFEE1 ON) ASSISTANT E'
PUBLIC HEALTH ENGG. mQfl HIGH WAYSJWIION
S
TENDER REFERENCE NO. N.LT No. EE/HW-D/TC/ 503 Dated. 04.12.20 17
NAME OF PROCURING EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
NAME OF WORK CONSTRUCTION OF ROAD FROM NATIONAL HIGHWAY TO VILLAGE BHAI KHAN GHANGHRO MILE 0/0-0/3+330' (1.60KM.
1 TURNOVER OF O5°• TENDER FEE!
SR. NO.
NAME OF FIRM/ BIDDERS N.T.N REGISTRATION
WITH P.E.0 SINDH BOARD OF REVENUE
RELEVANT EXPERIENCE
AT LEAST LAST THREE YEARS
BUDGET EARNEST
MONEY COST BIDDING
DOCUMENT
I M, S RAVI KUMAR ENTERPRISES Available Registered Registered Available Available Available Available Deposited
2 MIS SUKKUR CONSTRUCFION COMPANY
Available Registered Registered Av.idabk Ava:lable Available Available Deposited
CHAIRMAN MEMBER MEMBER
(RAFIQUE ARMED SHAJK (WAHEED BUX QAMI) (ABDUL HAFZ MEMON) EXECUTWE ENGINtER ASSISTANT ENGINEER ASSISTANT ENGINEER HIGHWAYS DIVISION HIGHWAYS SUB-DIVISION PUBLIC HEALTH ENGG: SUB-DIVISION
SUKKUR RORRI RORRI
ATTENDANCE SHEET OF PARTICIPATION IN TENDER PROCESS IN EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
NAME OF WORK: - CONSTRUCTION OF ROAD FORM WASS ROAD TO GHANTAN WARI VIA HAFIZ ABDUL SAMI MANGRIO MILE 0/0-0/5 (1 KM).
EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR HELD ON 22.12.2017
SR. NO.
NAME OF CONTRACTOR SIGNATURE
7
1 MIS JAN MUHAMMAD NAREJO
2 M/S AHMED ALl JAMALI \
I
CHAIRMAN
(RAFIQUE AHMED SHAI
EXECUTIVE ENGINEER HIGHWAYS DIVISION
SUKKUR
MEMBER MEMBER
7}J S (WAHEED BUX QASMI)
ASSISTANT ENGINEER HIGHWAYS SUB-DIVISION
ROHRI
(ABDUL HAFE)MON) ASSISTANT NGINEER
PUBLIC HEALTH ENGG: SUB-DIVISION ROHRI
BID EVALUTION REPORT
1 Name of Procuring Agency Executive Engineer Highways Division Sukkur
2 Tender Reference No. N.I.T No. EE/HW-D/TC/ 503 Dated. 04.12.2017
3 Tender Description/ Name of Work/ Item CONSTRUCTION OF ROAD FORM WASS ROAD TO GRANTAN WAR! VIA HAFIZ ABDUL SAMI MANGRIO MILE 0/0-0/5 (1 KM).
4 Method of Procurement Single Stage (By Competitive Rate/ Bid)
5 Tender Published Published in (i)Da*ly Awami Awaz Karachi Dated. 07.12.2017 (II) Daily Express Karachi Dated. 07.12.2017 (iii) Daily Dawn Karachi Dated. 07.12.2017 (lv) Daily Sobh Karachi Dated. 07.12.2017
SPPRA ID NO:2 147483647 S.No. 35535 Dated: 05-12-20 17
5 Total Document Sold 02 Nos.
7 Total Bids Received 02 Nos.
8 Technical Bid Opening Date (If AoDlicableI
--
9 No of Bid Technically Qualified (If Applicable)
01 No.
10 Bids Rejected 01 Nos.
11 Financial Bid Opening Date 22.12.2017
BID EVALUATION REPORT
COST RANKING IN COMPARISON REASONS FOR SR # NAME OF FIRM OF BIDDER OFFERED BY TERMS OF WITH ESTIMATE ACCEPTANCE! REMARKS
THE BIDDER COST COST (SAVING) REJECTION
1 M/S JAN MUHAMMAD NAREJO
6432783 1st Lowest 61217 Accepted Being Lowest
2 M/S AHMED ALl JAMAL! 6482937 2nd Higher 11063 Rejected Being Higher
SIGNATURE OF THE TENDERING COMMITTEE.
CHAIRMAN
(RAFIQUE AHMED S EXECUTIVE ENG NEER
HIGHWAYS DIVISION SUKKUR
MEMBER MEMBER
(WAHEED BUX 4~XMI) ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION ROHRI
(ABDUL HAFEEZ MEMON) ASSISTANT ENGINEER
PUBLIC HEALTH ENGG: SUB-DIVISION ROHRI
SR NO
ESTIMATE
I RATE
MIS JAN MUHAMMAD NAREJO
AMOUNT DESCRIPTION
M/S ARMED ALl JAMALI
RATE AMOUNT —j
ABDU[ HAFEEZ ASSISTANT . ER
PUBLIC HEALTH ENGG: S ..
(WAHEE : U') DASM)) ASSISTAN EN("
MIGHWAYS StJB-UiV'- Rt
.4
FINANCIAL REVIEW / COMPARATIVE STATEMNT
NAME OF WORK: - CONSTRUCTION OF ROAD FORM WASS ROAD TO GHANTAN WAR! VIA HAFIZ ABDUL SAM! MANGRIO MILE 0/0-0/5 (1 KM).
PART "A" (ROAD WORK
1 Amount of Schedule"B" 4710827 4710827 4710827
2 Add: 8% Above 376866 7.30% Above (i') 343890 8.13% Above () 382990
3 Ded:DiffCostofBituinen (-) 319423 319423 319423 PART "A" 4768270 4735294 4774394
PART "B" (ROAD WORK
1 Amount of Schedule "B' 1368304 1368304 1368304
2 Add: 14%Above (+) 191562 13.50% Above (+) 184721 14.15% Above (+) 193615
3 Ded: Duff Cost of Bitumen (-j 79799 79799 79799 PART "B" 1480067 1473226 1482120
PART "C" (3' SPAN CULVERTS 1 Amount of Schedule "B" 172242 172242 172242 2 Fermium -- 12.50% Above (+), 21530 13.60% Above (+) 23425 3 Add: Cartage of Material () 22583
PART "C" 194825 193772 195667 PART "D" (PIPE CULVERTS
1 Amount of Schedule "B" 26285 26285 26285 2 Fermium -- 16% Above (+J, 4206 17.0 1% Above (+) 4471 3 Add: Cartage of Material (i') 4329
PART 'D" 30614 30491 30756
GRAND TOTAL A+B+C+D: - 6473776 6432783 6482937
ADD: CONTIGENCY (LUM-SUM) 20000
(A) Total Cost as per Estimate (B) Total as per Tender
Saving (A+B) Percentage Saving
A,A Amount Lowest Tender Amount
Saving Over A.A
6494000 6432783
61217 0.94
6500000 6432783
67217
The Lowest Rates Qouted By MIS JAN MUHAMMAD NAREJO Govcrnmcn Contractor are:-
PART "A" Rs. 7.30% Above (Rupees Seven Point Thirty Percent Above) PART "B" (a; Rs. 13.50% Above (Rupees Thirteen Point Fifty Percent Above) PART "C" (a Rs. 12.50% Above (Rupees Twelve Point Fifty Percent Above) PART "D" (a Rs. 16% Above (Rupees Sixteen Percent Above) Loicst Rates are Recommended for Approval
IGH WAYS DIVt81öN
4
TENDER REFERENCE NO.
NAME OF PROCURING
NAME OF WORK
Q
N.I.T No. EE/HW-D/TC/ 503 Dated. 04.12.2017
EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
CONSTRUCTION OF ROAD FORM WASS ROAD TO GHANTAN WAR! VIA HAFIZ ABDUL SAM!
MANGRIO MILE 0/0-0/5 (1 KM).
I -
SR NO.
NAME OF FIRM/ BIDDERS N.T.N REGISTRATION
WITH P.E.0 SINDH BOARD OF REVENUE
RELEVANT EXPERIENCE
TURNOVER 0? AT LEAST LAST THREE YEARS
BUDGET
05% TENDER FEEl COST BIDDING
DOCUMENT EARNEST
MONEY
I- - * h
1 M/S JAN MUHAMMAD NAREJO Available Registered Registered Available Available Available Available Deposited
2 MIS AHMED ALl JAMAL! Available Registered Registered Available Available Available Available Deposited
CHAIRMAN MEMBER MEMBER
(RAFIQUE AHMED SHAICli) (WAHEED BUX QASMI) (ABDUL HA11Z MEMON) EXECUTIVE ENGINER ASSISTANT ENGINEER ASSISTANT ENGINEER HIGHWAYS DIVISION HIGHWAYS SUB-DIVII0N PUBLIC HEALTH ENGO: SUB-DIVISION
SUKKUR ROHRI ROHRI
4
ATTENDANCE SHEET OF PARTICIPATION IN TENDER PROCESS IN EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
NAME OF WORK: - PAV1R BLOCK FLOORING & DRAINS (i VILLAGE BHAI KHAN GHANGHRO (REMAINING WORKS).
EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR HELD ON - 22.12.2017
SR. NO.
NAME OF CONTRACTOR SIGNATURE
I M/S SA1B RASH EED & CO
2 M/SAL-NOOR
3 M/SIFTINHARAHMED
y r
CHAIRMAN
(RAFIQUE ATED SHAIKH) EXECUTf'E ENGINEER
HIGHWAYS DIVISION SUKKUR
MEMBER MEMBER
\Ac\ 'I
(WAHEED BUX QASMI) (ABDUL HA Z EMON ASSISTANT ENGINEER ASSISTANT EER
HIGHWAYS SUB-DIVISION PUBLIC HEALTH ENGG: SUB-DIVISION ROHRI ROHRI
S
ID EVALUTIQN REPORT
I Name of Procuring Agency Executive Engineer Highways Division Sukkur
2 Tender Reference No. N.J.T No. EE/HW.D/TC/ 503 Dated. 04.12.2017
3 Tender Description! Name of Work! Item PAVER BLOCK FLOORING & DRAINS @ VILLAGE BHAI KHAN GHANGHRO (REMAINING WORKS).
4 Method of Procurement Single Stage (By Competitive Rate! Bid)
5 Tender Published Pu)lished in (i)Daily Awarni Awaz Karachi Dated. 07.12.2017
(ii) Daily Express Karachi Dated. 07.12.20 17 (iii) Daily Dawn Karachi Dated. 07.12.2017 (iv) Daily Sobh Karachi Dated. 07.12.2017
SPPRA ID NO:2 147483647 S.No. 35535 Dated: 05-12-20 17
6 Total Document Sold 03 Nos.
7 Total Bids Received 03 Nos.
8 Technical Bid Opening Date (If Applicable)
--
9 No of Bid Technically Qualified (If Applicable)
01 No.
10 Bids Rejected 02 Nos.
11 Financial Bid Opening Date 22.12.2017
BID EVALUATION REPORT
SR # NAME OF FIRM OF BIDDER COST
OFFERED BY RANKING IN TERMS OF
COMPARISON WITH
REASONS FOR ACCEPTANCE! REMARKS
THE BIDDER COST ESTIMATE cosT
REJECTION
1 MIS SAQIB RASHEED & CO
4833534 i' Lowest 144466 Accepted Being Lowest
2 M/S ALNOOR 4969964 2' Higher 8036 Rejected Being Higher
3 M/S IFTIKHAR AHMED 5025998 3 Highest -47998 Rejected Being Highest
SIGNATURE OF THE TENDERING COMMITTEE.
CHAIRMAN
(RAFIQUE AHMjaSHAIKH) EXECUTIVENGINEER
HIGHWAYS DIVISION SUKIUJR
*
*1
MEMBER
\l
v,
(WAHEED BUX ASMI) ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION ROH RI
MEMBER
(ABDUL HA ASSISTANT E
PUBLIC HEALTH OHRI
EZ MON) INEE
B-DIVISION
GRAND TOTAL A, B, C: - 4880060 4833534 4969964 5025998
ADD: CONTIGENCY (LUM-SUM) 97450
Ibe Lowest Rates Qouted l3' M/S SAOIB RASHEED & CO Government Contractor are:-
PART "A" ii Rs. 0.80% Below (Rupees Zero Point Eighty Percent Below)
Lowest Rates are Recommended for Approval
(A) Total Cost as per Estimate 4978000 (B) Total as per Tender 4833534
Saving (A+B) 144466 Percentage Saving 2.90
A.A Amount 5000000 Lowest Tender Amount 4833534
Saving Over A.A 166466
(ABDULHAF Z*:i ASSISTANt E. NEER
PUBLIC HEALTH EN G: SUB-DIVISION ROHRI
(WAHEED BUX eASMI) ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION ROHRI
INANCW REVIEW / COMPARATIVE STATEMNT
NAIVIE OF WORK: - PAVER BLOCK FLOORING & DRAINS @: VILLAGE BHAI KHAN GHANGHRO (REMAINING WORKS).
r SR NO
DESCRIPTION ESTIMATE M/S SAQIB RASHEED & Co MIS AL-NOOR M/S IFFIKHAR AHMED
RATE-
AMOUNT RATE AMOUNT [] RATE AMOUNT-
PART "A" (ROAD WORK
AmountofScheduleB" 4872514 4872514 4872514 4872514
Dccl: 20% Below (on Paver Block Only) n Rs. 4063321/-
812664 0.80% Below (-) 38980 2% Above (~) 97450 3.15% Above Nj 153484
3 Add: Cartage of Material () 820210
ErC(jT)'r>-'' \!EER -..--. I)S1ON SUKKUR
N
TURNOVER OF 05% TENDER FEEl AT LEAST LAST
FUNDS! EARNEST COST BIDDING
THREE YEARS BUDGET
MONEY DOCUMENT
J
NAME OF FIRM! BIDDERS RELEVANT
EXPERIENCE
'I
TENDER REFERENCE NO. N.I.T No. EE/HW-D/TC/ 503 Dated. 04.12.20 17
NAME OF PROCURING EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
NAME OF WORK PAVER BLOCK FLOORING & DRAINS a VILLAGE BHAI KHAN GHANGHRO (REMAINING WORKS).
SR. NO.
1 MIS SAQIB RASHEED & CO .\vailable Registered Registered \va:Iablv Available Available Available Deposited
2 MIS AL-NOOR Available Registered Registered Available Available Available Available Deposited
3 MIS 11T1KHAR AHMED Available Registered Registered Available Available Available Available Deposited
CHAIRMAN
(RAFIQUE AHffiD SHAIKH) EXECUT-1 ENGINEER HIGHWAYS DIVISION
SUKKUR
MEMBER
(WAHEED BUX QSMI) ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION RO H RI
MEMBER
(ABDUL HAFEEZ MVMON) ASSISTANT ENG
PUBLIC HEALTH ENGc/ . -DIVISION ROH
ATTENDANCE SHEET OF PARTICIPATION IN TENDER PROCESS IN EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKJR
NAME OF WORK: - CONSTRUCTION OF ROAD FROM THICKRATHO ROAD TO GHATTI MILE 0/0-2/1.
EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR HELD ON 22.12.2017
SR. NO.
NAME OF CONTRACTOR SIGNJWtJRE
1 MIS AM & MJ BUILDERS
2 M/S AL-MUZAMIL SHAIKH CONSrF: & CO.
3 M/S MANZOOR AHMED & BROTHERS
CHAIRMAN
(RAFIQUE AHISHAIKH)
EXECUTIVE ENGINEER HIGHWAYS DIVISION
SUKKUR
MEMBER MEMBER
(WAHEED BUX QASMI) (ABDUL HAFEE ASSISTANT ENGINEER ASSISTANT 'i NEER
HIGHWAYS SUB-DIVISION PUBLIC HEALTH ENGG: SUB-DIVISION ROHRI ROHRI
BID EVALUTiON RP9RT
I Name of Procuring Agency Executive Engineer Highways Division Sukkur
2 Tender Reference No. N.I.T No. EE/HW-D/TC/ 503 Dated. 04.12.20 17
3 Tender Description! Name of Work/ Item CONSTRUCTION OF ROAD FROM THICKRATHO ROAD TO GHATTI MILE 0/0-2/1.
4 Method of Procurement Single Stage (By Competitive Rate! Bid)
5 Tender Published Published in (i)Dally Awami Awaz Karachi Dated. 07.12.2017 (ii) Daily Express Karachi Dated. 07.12.2017 (iii) Daily Dawn Karachi Dated. 07.12.2017 (iv) Daily Sobh Karachi Dated. 07. 12.20 17
SPPRA ID NO:2 147483647 S.No. 35535 Dated: 05-12-2017
6 Total Document Sold 03 Nos.
7 Total Bids Received 03 Nos.
8 Technical Bid Opening Date (If Applicable)
--
9 No of Bid Technically Qualified (If Applicable)
01 No.
10 Bids Rejected 02 Nos.
11 Financial Bid Opening Date 22.12.20 17
BID EVALUATION REPORT
COST RANKING IN COMPARISON REASONS FOR SR # NAME OF FIRM OF BIDDER OFFERED BY TERMS OF WITH ESTIMATE ACCEPTANCE! REMARKS
THE BIDDER COST COST (SAVING) REJECTION
I M/S AM & MJ BUILDERS 22365881 1t Lowest 107219 Accepted Being Lowe St
2 M/S ALMUZAMIL SHAIKH CONSTI': & CO.
22614397 2 Higher -141297 Rejected Being Higher
3 M/S MANZOOR AHMED & BROTHERS
22851243 3fl Highest -378143 Rejected Being Highest
SIGNATURE OF THE TENDERING COMMITTEE.
CHAIRMAN
(RAFIQUE AHMEHAIKH) EXECUTiVE ETGINEER
HIGHWAYS DIVISION SUKKUR
MEMBER MEMBER
L1 ' (WAHEED BUX QASMI) ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION ROH
(ABDUL HAFEEZ MEMON) ASSISTANT ENGINEER
PUBLIC HEALTH ENGG: SUB-DIVISION ROHRI
M/S AM & MJ BUILDERS
RATE AMOUNF]
M/S AL-MUZAMIL SHAIKH CONSTF: &) CO.
RATE AMOUNT
MIS MANZOOR AHMED BROTHERS
RATE AMOUNT ii
(A) Total Cost as per Estimate (B) Total as per Tender
Saving (A+B) Percentage Saving
A.A Amount Lowest Tender Amount
Saving Over A.A
22473100 22365881
107219 0.48
23000000 22365881
634119
GRAND TOTAL A+B: - 22473135 22365881 22614397 22851243
ADD: CONTIGENCY (LUM-SUM)
The Lowest Rates Qouted By MIS AM & MJ BUILDERS Government Contractor are:-
PART "A" @ Rs. 7.50% Above (Rupees Seven Point Fifty Percent Above) PART "B" @ Rs. 16% Above (Rupees Sixteen Percent Above)
Lowest Rates are Recommended for Approval
p.
FINANCIAL REVIEW / COMPARATIVE STATEML
NAME OF WORK: - CONSTRUCTION OF ROAD FROM THICKRATHO ROAD TO GHATTI MILE 0/0-2/1.
SR NO
DESCRIPTION ESTIMATE
PART "A" (ROAD WORK
1 AmountofSchedule"B" 21035755 21035755 21035755 21035755
2 Add: 8% Above (+) 1682860 7.50% Above (+) I 1577682 8.63% Above (+i 1815386 9.7 1% Above (+) 2042572
3 Ded: Diff Cost of Bitumen 1357490 1357490 1357490 1357490
PART "A" 21361125 21255947 21493651 21720837 PART "B" (6' SPAN CULVERTS
1 Amount of Schedule "B" 159473 159473 159473 159473
2 Permium -- 16% Above (+) 25516 17.13% Above (+) 27318 18.14% Above (+) 28928
3 Add: Cartage of Material (+) 25862
PART "B" 185335 184989 186791 188401 = 1112010 x 6 = 1109934 x 6 = 1120746 x 6 = 1130406
(ABDUL ASCI5ri' F,.
CG ROJR1
(WAHEED BUX QASMI)' ASS!TANT GiNEER
HG}aYAYS SUB-DVlSlON f'i 0 ii
a%iiLJi2-
EXECCTV GHWAY$ DMSIOPI
SLIKKUR
QTJXaIF'IGA'rIQJ EO'I'
TENDER REFERENCE NO. N.I.T No. EE/HW.D/TC/ 503 Dated. 04.12.2017
NAME OF PROCURING EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
NAME OF WORK CONSTRUCTION OF ROAD FROM THICKRATHO ROAD TO GRATTI MILE 0/0-2/1.
NAME OF FIRM! BIDDERS N.T.N REGISTRATION WITH F.E.0
SINDH BOARIJ OF REVENUE
RELEVANT EXPERIENCE
TURNOVER OF AT LEAST LAST THREE YEARS
FUNDS/ BUDGET EST
MONEY
TENDER FEEl COST BIDDING
DOCUMENT
I M/S AM & MJ BUILDERS Available Registered Registered Available Available Available Available Deposited
2 MIS AL-MUZAMIL SHAIKH CONSTT: & Co.
Available Registered Registered Available Available Available Available Deposited
3 MIS MANZOOR AHMED & BROTHERS Available Registered Registered Available Available Available Available Deposited
CHAIRMAN MEMBER MEMBER
(RAFIQUE AHIEDSHAIKH) EXECUTW ENGINEER HIGHWAYS DIVISION
SUKKUR
(WAHEEDBUX QA%MI) ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION ROHRI
(ABDUL-I4AWEZ MEMON) ASSISTANT ENGINEER
PUBLIC HEALTH ENOG: SUB-DWISION ROHRI
ATTENDANCE SHEET OF PARTICIPATION IN TENDER PROCESS IN EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
NAME OF WORK: - REHABILITATION & RESTORATION OF HIGH COURT ROAD.
EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR HELD ON 22. 12.2017
SR. NO.
NAME OF CONTRACTOR SIGNATURE
1
2
M/S NEW ROYAL ENTERPRISES
M/S THE TEAM
CHAIRMAN
(RAFIQUE AHME9SfiAIKH) EXECUTIV1NGINEER
HIGHWAYS DIVISION SUKKUR
MEMBER MEMBER
(WAHEED BUX QASMI) (ABDUL HAFEEZ MEMON) ASSISTANT ENGINEER ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION PUBLIC HEALTH ENGG: SUB-DIVISION ROHRI ROHRI
S B I D EL&L LLQJLR E P 0 R T
I Name of Procuring Agency Executive Engineer Highways Division Sukkur
2 Tender Reference No. N.l.T No. EE/HW-D/TC/ 503 Dated. 04.12.20 17
3 Tender Description/ Name of Work/ Item REHABILITATION & RESTORATION OF HIGH COURT ROAD.
4 Method of Procurement Single Stage (By Competitive Rate! Bid)
5 Tender Published Published in (i)Daily Awanii Awaz Karachi Dated. 07. 12.2017
(ii) Daily Express Karachi Dated. 07.12.2017 (iii) Daily Dawn Karachi Dated. 07.12.2017 (iv) Daily Sobh Karachi Dated. 07.12.2017
SPPRA ID NO:2 147483647 S.No. 35535 Dated: 05-12-2017
6 Total Document Sold 02 Nos.
7 Total Bids Received 02 Nos.
8 Technical Bid Opening Date (If Aoolicable)
--
9 No of Bid Technically Qualified (If Applicable)
01 No.
10 Bids Rejected 01 Nos.
11 Financial Bid Opening Date 22.12.2017
BID EVALUATION REPORT
COST RANKING IN COMPARISON REASONS FOR SR # NAME OF FIRM OF BIDDER OFFERED BY TERMS OF WITH ESTIMATE ACCEPTANCE! REMARKS
THE BIDDER COST COST (SAVING) REJECTION
I MIS NEW ROYAL ENTERPRISES
9605144 i Lowest 189856 Accepted Being Lowest
2 MIS THE TEAM 9675088 2 Higher 119912 Rejected Being Higher
SIGNATURE OF THE TENDERING COMMITTEE.
CHAIRMAN
(RAFIQUE AHMEDHIKH) EXECUTIVE2tGINEER
HIGHWAYS DIVISION SUKKUR
MEMBER MEMBER
(ABDUL HAFljAIEMON1 ASSISTANT t1iEER
PUBLIC HEALTH ENGG: SUB-DIVISION ROHRI
(WAHEED BUX QIf111r ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION ROHRI
M/S NEW ROYAL ENTERPRISES ESTIMATE
RATE ir AMOUNT
SR NO
DESCRIPTION
(ABD(JL HA ''Z N) ASSISTi't1Y
PUBUCHF:: H OH Ifl
'(WAHEED BUX ASSISrANi ENGINEER
H(GNWA1 D)VISLON
FJNANCIALRAWLEW/COMFARATIVESThTEMNT
NAME OF WORK: - REHABILITATION & RESTORATION OF HIGH COURT ROAD.
MIS THE TEAM
RATE AMOUNT
PART "A" (ROAD WORK 1 Amount of Schedule "13" 7163644 7163644 7163644
2 Add: 14% Above on Except Item No. 06 on Rs. 4348236/-
608753 Add: 13.50% Above on Except Item No. 06 on Rs. 4348236/-
587012 Add: 14.30% Above on Except Item No. 06 on Rs. 4348236/-
621798
Add: 20% Above on Asphalt Concrete Only on Rs. 26723 13/- • ) 534463
Add: 19.50% Above on Asphalt Concrete Only on Rs. 2672313/-
521101 Add: 20.10% Above on Asphalt Concrete Only on Rs. 2672313/-
537135
4 Ded: Duff Cost of Bitumen (-) 693792 693792 693792 TOTAL: A 7613068 7577965 7628785
PART "B" (MASONARY STRUCTURE I Amount of Schedule "B" 1912433 1912433 1912433 2 Permium (-) 6% Above (+) 114746 7% Above (+) 133870 3 Add: Cartage of Material (4) 125991
TOTAL: B 2038424 2027179 2046303
GRAND TOTAL A+B: - 9651492 9605144 9675088
ADD: CONTIGENCY (LUM-SUM) 143273
The Lowest Rates Qouted By M/S NEW ROYAL ENTERPRISES Government Contractor are:-
PART "A" (l)@ Rs.13.50% Above on Except Item No. 06 on Rs. 4348236/-PART "A" (II) 6 Rs. 19.50% Above on Asphalt Concrete Only on Rs. 26723 13/-PART "B" @ Rs. 6% Above (Rupees Six Percent Above)
Lowest Rates are Recommended for Approval
(A) Total Cost as per Estimate 9795000 (B) Total as per Tender 9605144
Saving (A~B) 189856 Percentage Saving 1.94
A.A Amount 10000000 Lowest Tender Amount 9605144
Saving Over A.A 394856
EXECUTIVE_SN'GiNEER HIGHWAYS DIVISION
SUKKUR
ti
TENDER REFERENCE NO. N.I.T No. EE/HW-D/TC/ 503 Dated. 04.12.20 17
NAME OF PROCURING EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
NAME OF WORK REHABILITATION & RESTORATION OF HIGH COURT ROAD.
SR. NO.
NAME OF FIRM/ BIDDERS N.T.N REGISTRATION
WITH P.E.0 SINDH BOARD OF REVENUE
RELEVANT EXPERIENCE
TURNOVER OF AT LEAST LAST
FUNDS/ BUDGET
05% EARNEST
TENDER FEE! COST BIDDING
THREE YEARS MONEY DOCUMENT
I
I M/S NEW ROYAL. ENTERPRISES Available Registered Registered Available Available Available Available Deposited
2 MIS THE TEAM \.wlable Registered Registered Available Available Available Available Deposited
CHAIRMAN MEMBER MEMBER
(RAFIQUE AHMD..8ffAIKH) (WAHEED BUX QASMI) (ABDUL HAFEE MEMON) EXECUTIVENGINEER ASSISTANT ENGINEER ASSISTANT ENGINEER HIGHWAYS DIVISION HIGHWAYS SUB-DIVISION PUBLIC HEALTH ENGG SUB-DIVISION
SUKKUR ROHRI ROHRI
ATTENDANCE SHEET OF PARTICIPATION IN TENDER PROCESS IN EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
NAME OF WORK: - IMPR:/ RECDG: OF ROAD & PAVER BLOCK ROAD OF ARRORE BACHAL SHAH ROAD TO ABDUL KAREEM LUND MOULA ABAD MILE 0/0-1/4 (2.40 KM).
EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR HELD ON 22.12.2017
SR. NO.
NAME OF CONTRACTOR SIGNATURE
1 M/S BAHADUR ALl SHAIKH _'-)- ___ BAHADUR ALl $AkH i.GOVT:CONTRAtU*IIcH
GUVLuNIRACTOR
2 M/S LAL KHAN BUG HTI & BROTHERS
CHAIRMAN
(RAFIQUE AHMW SHAIKH) EXECUTIWENGINEER
HIGHWAYS DIVISION SUKKUR
MEMBER MEMBER
(WAHEED BUX QASMI) ASSISTANT ENGINEER ASSISTANT EJEER
HIGHWAYS SUB-DIVISION PUBLIC HEALTH ENGG: SUB-DIVISION ROHRI ROHRI
\\\
(ABDUL HAFEEZ M,'MON)
(WAHEED BUX4ASMI) ASSISTM(T ENGINEER
HIGHWAYS SUB-DIVISION RORRI
JD E V Ui T INE_P.QI
1 Name of Procuring Agency Executive Engineer Highways Division Sukkur
2 Tender Reference No. N.1.T No. EE/HW-D/TC/ 503 Dated. 04.12.2017
3 Tender Description/ Name of Work! Item IMPR:/ RECDG: OF ROAD & PAVER BLOCK ROAD OF ARRORE BACHAL SHAH ROAD TO ABDUL KAREEM LUND MOULA ABAD MILE 0/0-1/4 (2.40 KM).
4 Method of Procurement Single Stage (By Competitive Rate! Bid)
5 Tender Published Published in (i)Daily Awami Awaz Karachi Dated. 07. 12.2017
(Ii) Daily Express Karachi Dated. 07. 12.2017 (lii) Daily Dawn Karachi Dated. 07.12.2017 (iv) Daily Sobh Karachi Dated. 07.12.2017
SPPRA ID NO:2 147483647 S.No. 35535 Dated: 05-12-2017
6 Total Document Sold 03 Nos. 7 Total Bids Received 03 Nos. 8 Technical Bid Opening Date
(If Applicable) --
9 No of Bid Technically Qualified (If Applicable)
01 No.
10 Bids Rejected 02 Nos.
11 Financial Bid Opening Date 22.12.2017
BID EVALUATION REPORT
COST RANKING IN COMPARISON REASONS FOR SR 4# NAME OF FIRM OF BIDDER OFFERED BY TERMS OF WITH ESTIMATE ACCEPTANCE! REMARKS
THE BIDDER COST COST (SAVING) REJECTION
I M/S BAHADUR AL! SHAIKH 19468469 in Lowest 207531 Accepted Being Lowest
2 M/S LAL KHAN BUGHTI & BROTHERS
19579122 2 Higher 96878 Rejected Being Higher
SIGNATURE OF THE TENDERING COMMITTEE.
CHAIRMAN
(RAFIQUE AHMEJ>1IAIKH) EXECUTIVE-GINEER
HIGHWAYS DIVISION SUKKUR
MEM BER MEMBER
(ABDUL HA EZ EMON) ASSISTANT GINE
PUBLIC HEALTH - : SUB-DIVISION ROHRI
'MIS HAIJADtJR ALl -aTAIKU
RATE II AMOUNT
M/S LAL K}1AN BUGHTI & BROTHERS
RATE AMOUNT
SR NO
DESCRIPTION ESTIMATE
PART 'C" 646309 643440 647330
GRAND TOTAL A+B+C: - 19553954 19468469 19579122
ADD: CONTIGENCY (LUM-SUM) 122364
The Lowest Rates 'outed By M/S BAHADUR ALl SHAIKE Government Contractor are:-
PART "A' u Rs, 13.60% Above (Rupees Thirteen Point Sixty Percent Above) PART "B' o R,s. 3.70% Above (Rupees Three Point Seventy Percent Above) PART "C" i Rs. I 5,80% Above (Rupees Fifteen Point Eighty Percent Above)
Lowest Ratesar( Recommended for Approval
(A) Total Cost as per Estimate (B) Total as per Tender
Saving (A+ B) Percentage Saving
A,A Amount Lowest Tender Amount
Saving Over A.A
19676000 19468469
207331 1.05
20000000 19468469
531531
NC1ALRE1VIEW / COMPARATIVE S TEMN
NAME OF WORK: - IMPR:/ RECDG: OF ROAD & PAVER BLOCK ROAD OF ARRORE BACHAL SHAH ROAD TO ABDUL KAREEM LUND MOULA ABAD MILE 0/0-1/4 (2.40 KM).
PART "A" ROAD WORK)
1 Amount of' Schedule "B" 14170383 14170383 14170383
2 Add: 14% Above (1 1983854 13.60% Above (1 1927172 14.10% Above (~) 1998024
3 Ded: Duff Cost of Bitumen (-') 1410221 1410221 1410221 PART A" 14744016 14687334 14758186
PART B (PAVER BLOCK)
I Amount of Schedule "B" 3990063 3990063 3990063
2 Ded: 20% I3rlow (on Paver Block Onlyon Rs.3164356/-)
632871 3.70% Above (+) 147632 4,60% Above (+) 183543
3 Add: Cartage of Material (+) 806437 PART "B" 4163629 4137695 4173606
PART "C" (DRAINAGE
1 Amount of Schedule "B" 555648 555648 555648
2 Permium -- 15.80% Above (+) 87792 16.50% Above (-') 91682
3 Add: Cartage of Material (+) 90661
(ABDUI-HAd ( 'HEED ASSISTAN ENGINEER
PUBUC HE<h EiiU. '
RO HR
', HlGHWAYDlVIs;oN SUKKUR
ThE A S SI S TA N
HIGHWAYS RC,i
xIcA'JxoN S TENDER REFERENCE NO. N.I.T No. EE/ HW-D/TC/ 503 Dated. 04.12.2017
NAME OF PROCURING EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
NAME OF WORK IMPR:/ RECDG: OF ROAD & PAVER BLOCK ROAD OF ARRORE BACHAL SHAH ROAD TO ABDUL
KAREEM LUND MOULA ABAD MILE 0/0-1/4 (2.40 KM).
SR. NO.
NAME OF FIRM! BIDDERS N.T.N REGISTRATION
WITH P.E.0 SINDH BOARD OF REVENUE
RELEVANT EXPERIENCE
TURNOVER OF AT LEAST LAST THREE YEARS
FUNDS/ BUDGET
05% EARNEST
MONEY
TENDER FEEl COST BIDDING
DOCUMENT
1 MIS BAlIADUR ALl Sl-IAIKH Available Registered Registered Available Available Available Available l)eposited
2 MIS LAL KI-IAN BUGHTI & BROTHERS Available Registered Registered Availabk Available Available Available Deposited
CHAIRMAN
MEMBER MEMBER
(ABDUL EMONV ASSISTANT NGINE1(
PUBLIC HEALTH ENp9-SUB-DIVISION ROFJ
(RAFIQUE AHM SHAIKH) EXECUTWENGINEER HIGHWAYS DIVISION
SUKKUR
(WAHEED BUX QASMI) ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION ROHRI
ATTENDANCE SHEET OF PARTICIPATION IN TENDER PROCESS IN EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
NAME OF WORK: - CONSTRUCTION OF PAVER BLOCK FLOORING & DRAINS VILLAGE FATEH MOHAMMAD NOONARI (REMAINING WORKS).
EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR HELD ON
22.12.2017
SR. NO.
NAME OF CONTRACTOR SIGNATURE
I M/SGHULAMMURTAZAOHUMRO
2 '1/S JAVED AKHTAR IKElUl-IAWEP
is
3 MIS MOLE DINO CHACHAR
tijS HACHAR GS(T INTRACTOR
CHAIRMAN
(RAFIQUE AHMESHAIKH) EXECUTIVE ENGINEER HIGHWAYS DIVISION
SUKKUR MEMBER MEMBER
(WAHEED BUX QASMI) ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION ROHRI
(ABDUL HAFEEZ;MEMON) ASSISTANT IGINEER
PUBLIC HEALTH ENGG: SUB-DIVISION ROHRI
BLPEYALUXLQjLLLEQRI
I Name of Procuring Agency Executive Engineer Highways Division Sukkur
2 Tender Reference No. N.1.T No. EE/HW-D/TC/ 503 Dated. 04.12.20 17
S Tender Description/ Name of Work! Item CONSTRUCTION OF PAVER BLOCK FLOORING & DRAINS (i VILLAGE FATEH MOHAMMAD NOONARI (REMAINING WORKS).
4 Method of Pro'uremen Single Stage (By Competitive Rate/ Bid)
Tender Published Published in (i)Dally Awami Awaz Karachi Dated. 07.12.20 17
(ii) Daily Express Karachi Dated. 07. 12.2017 (iii) Daily Dawn Karachi Dated. 07.12.2017 (iv) Daily Sobh Karachi Dated. 07. 12.20 17
SPPRA ID NO:2 147483647 S.No. 35535 Dated: 05-12-2017
6 Total Document Sold 03 Nos.
7 Total Bids Received 03 Nos.
S Technical Bid Opening Date (If Anplicablel
--
9 No of Bid Technically Qualified (If Applicable)
01 No.
10 Bids Rejected 02 Nos.
11 Financial Bid Opening Date 22.12.2017
BID EVALUATION REPORT
COST 1 RANKING IN COMPARISÔN1 REASONS FOR
SR # NAME OF FIRM OF BIDDER OFFERED BY TERMS OF WITH ACCEPTANCE! REMARKS
THE BIDDER COST ESTIMATE REJECTION
___ COST
I M/S GHULAM MURTAZA GHUMRO
4822943 i' Lowest 168094 Accepted Being 1..owest
2 MIS JAVED AKHTAF KHUHAWER
4993452 2 Higher -2415 Rejected Being Higher
S M/S MOLE DINO CHACHAR 5022681 3' Highest -31644 Rejected Being Highest
SIGNATURE OF THE TENDBRING COMMITTEE.
CHAIRMAN
(RAFIQUE AHMJSHAIKH) EXECUTIVEENGINEER
HIGHWAYS DIV'SION SUKKUP
MEMBER MEMBER
(WAHEED BUX QASMI) ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION ROHRI
(ABDUL HA' Df )fEJVIONJ ASSISTANT EJG1NEER
PUBLIC HEALTH ENGG: SUB-DIVISION ROHRI
NAME OF WORK: - CONSTRUCTION OF PAVER BLOCK FLOORING & DRAINS & VILLAGE FATEH MOHAMMAD NOONARI (REMAINING WORKS).
DESCRIPTION ESTIMATE XMtINT RATE r AMOUNT 1 RATE
5022681 4893604 4822943 4993452 GRAND TOTAL A, B, C: -
FINACJAL REVIEW / COMPARATIVE STATEMNT
PART A" (ROAD WORK
1 AmountofSchedule B 4871660 4871660 4871660 4871660
2 Ded: 20% Below (on Paver Block Only) n Rs. 4033756/.
806751 1% Below(-) 48717 2.50% Above () 121792 3.10% Above (+) 151021
3 Add: Cartage of Material (+) 828695
I'hc Lowest Rates Qouted 13v MIS GHULAM MURTAZA GHUMRO Government Contractor are:-
1'ART "A" Rs. 1% 13c1ow (Rupees One Percent Below)
Lowest Rates are Recommended for Ap'roval
EXECUTIVEEGINEER HIGHWAYS DIVISION
SUKKUR
DIJLHAF :ASSISTANT E' EER PUBLIC HEALTH ENOG: SUBDIVISIO - ROHRI
(WAH)ED 6X ASMI) ASSISTANT EG1NEER GHWAYS SUB.D)VtSOt4
ROHRI
M/S GHULAM MURTAZA GBUMRO
_ir
MIS JAVED AKETAR KHUHAWER 1 M/S MOLE DINO CHACHAR
RATE j AMOUNT
ADD: CONTIGENCY (LUM.sUM) 97433
4991037 4822943
168094 3.37
5000000 4822943
177057
(A) Total Cost as l)C Estimate (B) Total as per Tender
Saving (MB) Percentage Saving
A.A Amount Lowest Tender Amount
Saving Over A.A
S TENDER REFERENCE NO. N.I.T No. EE/HW-D/TC/ 503 Dated. 04. 12.2017
NAME OF PROCURING EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
NAME OF WORK CONSTRUCTION OF PAVER BLOCK FLOORING & DRAINS a VILLAGE FATEH MOHAMMAD NOONARI (REMAINING WORKS).
SR. NO.
NAME OF FIRM/ BIDDERS N.T.N REGISTRATION
WITH PE.0 SINDH BOARD OF REVENUE
RELEVANT EXPERIENCE
TURNOVER 0F AT LEAST LAST
FUNDS/ BUDGET
05% EARNEST
TENDER FEE! COST BIDDING
THREE YEARS MONEY DOCUMENT
1 M/S CHULAM MURTAZA GHUMRO Available Registered Registered Available Available .\aihible Available Deposited
2 MIS JAVEI) AKHTAR KHUHAWEW Available Registered Registered Available Available Available Available Deposited
3 M/S MOLE DINO CHACHAR Available Registered Registered Available Available Available Available Deposited
CHAIRMAN MEMBER MEMBER
(RAFIQUE AHIjSHAIKH) (WAHEED BUX QASMI) (ABDUL HAF MEMON) EXECUTIVENGINEER ASSISTANT ENGINEER ASSISTANT ENGINEER HIGHWAYS DIVISION HIGHWAYS SUB-DIVISION PUBLIC HEALTH ENGSUB-DIVISION
SUKKUR ROHRI ROHRI
0 ATTENDANCE SHEET OF PARTICIPATION IN TENDER PROCESS IN EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
NAME OF WORK: - CONSTRUCTION OF ROAD 100 FT SOCIETY ROAD TO AHSAN LASHARI HOUSE MILE 0/0-0/3+ 160'.
EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR HELD ON 22. 12.2017
NAME OF CONTRACTOR SIGNATURE
SR. NO.
I M/S JAN MUHAMMAD & BROTHERS /
'S
UFI'
-.ovf_ onLaclor-'
2 M/S S.A MUNAM ENTERPRISES
3 M/S RAVI KUMAR ENTERPRISES
Mis RavIfflar Enterprises Govt: Contractor
CHAIRMAN
(RAFIQUE AHMWSHAIKH) EXECUTIWNGINEER
HIGHWAYS DIVISION SUKKUR
MEMBER MEMBER
\;— (WAHEED BUC QASMI) (ABDUL HAFEZ MEMON) ASSISTANT ENGINEER ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION PUBLIC HEALTH ENGG: SUB-DIVISION ROHRI ROHRI
J Name of Procuring Agency Executive Engineer Highways Division Sukkur
2 Tender Reference No. Nil' No. EE/HW-D/TC/ 503 Dated. 04.12.2017
3 Tender Description/ Name of Work! Item CONSTRUCTION OF ROAD 100 FT SOCIETY ROAD TO AHSAN LASHARI HOUSE MILE 0/0-0/3+160.
4 Method of Procurement Single Stage (By Competitive Rate/ Bid)
5 Tender Published Published in (i)Daily Awami Awaz Karachi Dated. 07.12.20 17
(ii) Daily Express Karachi Dated. 07.12.2017 (jill Daily Dawn Karachi Dated. 07.12.20 17 (iv) Daily Sobh Karachi Dated. 07. 12.20 17
SPPRA ID NO:2 147483647 S.No. 35535 Dated: 05-12-2017
6 Total Document Sold 03 Nos.
7 Total Bids Received 03 Nos.
8 Technical Bid Opening Date (If Anolicable)
--
9 No of Bid Technically Qualified (If Applicable)
01 No.
10 Bids Rejected 02 Nos.
11 Financial Bid Opening Date 22.12.2017
BID EVALUATION REPORT
COST RANKING IN COMPARISON REASONS FOR SR # NAME OF FIRM OF BIDDER OFFERED BY TERMS OF WITH ESTIMATE ACCEPTANCE/ REMARKS
THE BIDDER COST COST (SAVING) REJECTION
1 M/S JAN MUHAMMAD & BROTHERS
4930595 1 Lowest 64405 Accepted Being Lowest
2 M/S S.A MUNAM ENTERPRISES
5000746 2 Higher -5746 Rejected Being Higher
3 MIS RAVI KUMAR ENTERPRISES
5023312 3' Highct •2M312 Rejected Being Highest
SIGNATURE OF THE TENDERING COMMITTEE.
CHAIRMAN
(RAFIQUE AHMED S KH) EXECUTIVE NEER
HIGHWAY DIVISION SUKKUR
MEMBER MEMBER
JI1; (ABDUL HAFEE MEIYIONf
ASSISTANT ENGINEER PUBLIC HEALTH ENGG: SUB-DIVISION
ROFIRI
(WAHEED BUX QASMI) ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION ROHRI
GRAND TOTAL A, B: - 4969840 4930595 5000746 5023312
ADD: CONTIGENCY (LUM-SUM) 25000
The Lowesm Raus Qouted By M/S JAN MUHAMMAD & BROTHERS Government Contractor are:-
PART "A" (iJ Rs. 7.20% Above (Rupees Seven Point Twenty Percent Above)
Lowest Rates are Recommended for Apprtal
(A) Total Cost as ptr Estimate (B) Total as per Tender
Saving (A+B) Percentage Saving
A.A Amount Lowest Tender Amount
Saving Over A.A
4995000 4930595
64405 1.29
5000000 4930595
69405
0 FINA'CIAL REVIEW / COMPARATIVE STATEMNT
SK-034 NAME OF WORK: - CONSTRUCTION OF ROAD 100 FT SOCIETY ROAD TO AHSAN LASHARI HOUSE MILE 0/0-0/3~160.
SRDESCRIPTION ESTIMATE
-
M/S JAN MUHAMMAD & BROTHERS
-
M/ S.A MUNAM ENTERPRISES 1 M/S RAVI KUMAR ENTERPRiSES
RATE AMOUNT [] RATE AMOUNT RATE AMOUNT
PART "A" (ROAD WORK
1 Amount of Schedule '13" 4905629 4905629 4905629 4905629
2 Add: 8 % Above (+) 392450 7.20% Above (lj 353205 8.63% Above (+) 423356 9.09% Above (+) 445922
3 Ded: Dill Cost of Bitumen (-) 328239 328239 328239 328239
(ABDUL HAFLI ASSISTANT E I -.
PUBLIC HEALThE ROi.Rj SUB.o,v,s1011
0 BUX QAsMI)! ASSTANT ENGINEER
H c;h\AYS SUB-DIVISION
M ER
TENDER REFERENCE NO.
NAME OF PROCURING
NAME OF WORK
AIor
N.I.T No. EE/HW-D/TC/ 503 Dated. 04.12.20 17
EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
CONSTRUCTION OF ROAD 100 FT SOCIETY ROAD TO AHSAN LASHARI HOUSE MILE 0/0-
0/3+160'.
SR. NO.]
NAME OF FIRMI BIDDERS N.T.N REGISTRATION
WITH P.E.0 SINDH BOARD OF REVENUE
RELEVANT EXPERIENCE
TURNOVER OF AT LEAST LAST THREE YEARS
FUNDS/ BUDGET
05% EARNEST
MONEY
TENDER COST BIDDING
DOCUMENT
I M/S .IAN MUHAMMAD & BROTHERS Available Registered Ristered Available Available Available Available l);!
2 MIS S.,\ MUNAM ENTERPRISES Available Registered Registered Available Available Available Available Deposi:1
3 MIS RAVI KUMAR ENTERPRISES Available Registered Registered Available Available Available Available Deposited
CHAIRMAN MEMBER MEMBER
(ABDUL HAFI MEMON) ASSISTANT ENGINEER
PUBLIC HEALTH ENGG: SUB-DIVISION ROHRI
(RAFIQUE AHMEDfi!AIKH) EXECUTIVE1HNEER HIGHWA' DIVISION
SUKKUR
(WAHEED BUX QASMI) ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION ROHRI
• ATTENDANCE SHEET OF PARTICIPATION IN TENDER PROCESS IN
EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
NAME OF WORK: - CONSTRUCTION OF ROAD APPROACH TO PRE-STRESSED - BRIDGE RAZA GOTH MILE 0/0-0/2 TALUKA PANOAKIL
EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR HELD ON 22.12.2017
SR. NO.
NAME OF CONTRACTOR SIGNATURE
I MIS SAAD KHOKHAR ENTERPRISES
/
1 7/ ie_ -,
2 M/SYAKOOB BROTHERS
3 M/S ROHRI CONSTRUCTION CO
c*
CHAIRMAN
(RAFIQUE AHMEfrSHAIKH) EXECUTIVE-INGINEER HIGHWAYS DIVISION
SUKKUR MEMBER MEMBER
I'
(WAHEED BUC QASMI) (ABDUL HAP Z MEMON) ASSISTANT ENGINEER ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION PUBLIC HEALTH ENGG: SUB-DIVISION ROHRI ROHIU
1 Name of Procuring Agency Executive Engineer Highways Division Sukkur
2 Tender Reference No. N.I.T No. EE/HW-D/TC/ 503 Dated. 04. 12.2017
3 Tender Description/ Name of Work/ Item CONSTRUCTION OF ROAD APPROACH TO PRE-STRESSED BRIDGE RAZA GOTH MILE 0/0-0/2 TALUKA PANOAKIL
4 Method of Procurement Single Stage (By Competitive Rate/ Bid)
5 Tender Published Published in (i)Daily Awaini Awaz Karachi Dated. 07.12.2017 (ii) Daily Express Karachi Dated. 07.12.2017 (iii) Daily Dawn Karachi Dated. 07.12.2017 (iv) Daily Sobh Karachi Dated. 07. 12.2017
SPPRA ID NO:2 147483647 S.No. 35535 Dated: 05-12-2017
6 Total Document Sold 03 Nos.
7 Total Bids Received 03 Nos.
8 Technical Bid Opening Date (If Applicable)
--
9 No of Bid Technicall' Qualified (If Applicable)
01 No.
10 Bids Rejecte 02 Nos.
11 Financial Bid Opening Date 22.12.2017
BID EVALUATION REPORT
COST RANKING IN COMPARISON REASONS FOR SR # NAME OF FIRM OF BIDDER OFFERED BY TERMS OF WITH ESTIMATE ACCEPTANCE/ REMARKS
THE BIDDER COST COST (SAVING) REJECTION
1 M/S SAAD KHOKIIAR ENTERPRISES
9763468 1st Lowest 176532 Accepted Being Lowest
2 M/S YAKOOB BROTHERS 9830976 2' Higher 109024 Rejected Being Higher
3 M/S ROHRI CONSTRUCTION CO
9898484 3id Highest 41516 Rejected Being Highest
SIGNATURE OF THE TENDERING COMMITTEE.
CHAIRMAN
(RAFIQUE AHMEDSHAIKH) EXECUTWE ENGINEER
HIGHWAYS DWISION SUKKUR
MEMBER MEMBER
(WAHEED BUX ASMI) (ABDUL HAFEEZ MEMON) ASSISTANT ENGINEER ASSISTANT ENGINEER
HIGHWAYS SUB-DWISION PUBLIC HEALTH ENGG: SUB-DWISION ROHRI ROHRI
(A) Total Cost as per Estimate (B) Total as per Tender
Saving (A+B) Percentage Saving
A.A Amount Lowest Tender Amount
Saving Over A.A
9940000 9763468
176532 1.78
10000000 9763468
236532
PART "C" 195868 194633 196356 198078 x2 = 391736 x 2 389266 x 2 392712 x 2 396156
GRAND TOTAL A+B+C: - 9814929 9763468 9830976 9898484
ADD: CONTIGENCY (LUM-SUM) 124922
The Lowest Rates Qouted By MIS SAAED KHOKHAR ENTERPRISES. Government Contractor are:-
PART "A" Rs. 7.70% Above (Rupees Seven Point Seventy Percent Above) PART "B" Rs. 38% Above (Rupees Thirty Eight Percent Above) PART "C" @ Rs. 13% Above (Rupees Thirteen Percent Above)
Lowest Rates are Recommended for Approval
J'I*ANCIAL REVIEW / COMPARATIVE S4FATEMNT
A NAME OF WORK: - CONSTRUCTION OF ROAD APPROACH TO PRE-STRESSED BRIDGE RAZA GOTH MILE 0/0-0/2 TALUKA
PANOAKIL
S
SR NO
DESCRIPTION ESTIMATE MIS SAAD KHOKHAR ENTERPRISES
_______ M/S YAKOOB BROTHERS M/S RORRI CONST1UCTION Co
RATE j AMOUNT [] RATE AMOUNT J__RATE AMOUNT
PART "A" (ROAD WORK
1 AmountofSchedule"B" 6246111 6246111 6246111 6246111
2 Add: 8% Above (+) 499689 7.70% Above (+) 480951 8.40% Above (+) 524673 9.10% Above (+) 568396
3 Ded: Diff Cost of Bitumen (-) 159824 159824 159824 159824
PART 'A' 6585976 6567238 6610960 6654683 PART "B" (STONE PITCHING
1 Amount of Schedule "B 2034032 2034032 2034032 2034032
2 Perrojum -- 38% Above (1-) 772932 39% Above (+) 793272 40°A Above (+) 813613
3 Add: Cartage of Material (+) 803185
PART "B" 2837217 2806964 2827304 2847645 PART "B" (3' SPAN CULVERTS
1 Amount of Schedule "B" 172242 172242 172242 172242 2 Permium -- 13% Above (+) 22391 14% Above (+) 24114 15% Above (+) 25836 3 Add: Cartage of Material (+) 23626
(WAHtEL' • SM() ASSISTANI LNGlNEER
1-i IGHVAYS S1JE3-DlVISl0rI RORRI
(ABD(L F!,r.:,E'ON) ASS(STA. EGiflEER
PUBLIC iEAL1 EiG3: SUDVSlO • 4--- ROHRI
EXEcVJt!NEER HHWA'Y. I.MVSIONJ
TENDER REFERENCE NO. N.I.T No. EE/HW-D/TC/ 503 Dated. 04.12.2017
NAME OF PROCURING EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
NAME OF WORK CONSTRUCTION OF ROAD APPROACH TO PRE-STRESSED BRIDGE RAZA GOTH MILE 0/0-0/2 TALUKA PANOAKIL
NAME OF FIRM! BIDDERS N.T.N REGISTRATION
WITH P.E.0 SINDH BOARD OF REVENUE
RELEVANT EXPERIENCE
TURNOVER OF AT LEAST LAST
FUNDS! BUDGET
05% EARNEST
TENDER FEEl COST BIDDING
THREE YEARS MONEY DOCUMENT
1 M/S SAAD KHOKHAR ENTERPRISES :\vadable Registered Registered Available Available Available Available Deposited
2 MIS YAKOOB BROTHERS Available Registered Registered Available Available Available Available Deposited
3 M/S ROHRI CONSTRUCTION CO Available Registered Registered Available Available Available Available Deposited
CHAIRMAN MEMBER MEMBER
S
(RAFIQUE AHM SHAIKH) (WAHEED BUX QASMI) (ABDUL HAZ MEMON) EXECUTWEENGINEER ASSISTANT ENGINEER ASSISTANT ENGINEER HIGHWAYS DIVISION HIGHWAYS SUB-DIVISION PUBLIC HEALTH ENGG: SUB-DIVISION
SUKKUR ROHRI ROHRI
ATTENDANCE SHEET OF PARTICIPATION IN TENDER PROCESS IN EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
NAME OF WORK: - CONSTRUCTION OF ROAD FROM ARIF KHAN TO VILLAGE SHER MUHAMMAD KHOKHAR MILE 0/0-0/7.
EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR HELD ON 22.12.2017
SR. NO.
NAME OF CONTRACTOR SIGNATURE
1 M/S MAHTAM ENTERPRISES
2 M/S MUHAMMAD MALOOI< KATO
/
CHAIRMAN
(RAFIQUE AH)YSHAIKH) EXECUTIVE ENGINEER HIGHWAYS DIVISION
SUKKUR
MEMBER MEMBER
(WAHEED B QASMI) ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION ROHRI
(
(ABDUL HAF Z MEMON) ASSISTANT ENGINEER
PUBLIC HEALTH ENGG: SUB-DIVISION ROHRI
1 Name of Procuring Agency Executive Engineer Highways Division Sukkur
2 Tender Reference No. N.l.T No. EE/HW-D/TC/ 503 Dated. 04.12.2017
3 Tender Description! Name of Work/ Item CONSTRUCTION OF ROAD FROM ARIF KHAN TO VILLAGE SHER MUHAMMAD KHOKHAR MILE 0/0-0/7.
4 Method of Procurement Single Stage (By Competitive Rate! Bid)
5 Tender Published Published in (i)Daily Awami Awaz Karachi Dated. 07.12.20 17 (ii) Daily Express Karachi Dated. 07A22017 (iii) Daily Dawn Karachi Dated. 07.12.2017 (iv) Daily Sobh Karachi Dated. 07.12.2017
SPPRA ID NO:2 147483647 S.No. 35535 Dated: 05-12-2017
6 Total Document Sold 03 Nos.
7 Total Bids Received 03 Nos.
8 Technical Bid Opening Date (If Aoolicable)
--
9 No of Bid Technically Qualified (If Applicable)
01 No.
10 Bids Rejected 02 Nos.
11 Financial Bid Opening Date 22. 12.2017
BID EVALUATION REPORT
COST RANKING IN COMPARISON REASONS FOR SR # NAME OF FIRM OF BIDDER OFFERED BY TERMS OF WITH ESTIMATE ACCEPTANCE/ REMARKS
THE BIDDER COST COST (SAVING) REJECTION
1 M/S MAHTAM ENTERPRISES
9335052 is Lowest 146804 Accepted Being Lowest
2 M/S MUHAMMAD MALOOK KATO
9392445 2" Higher 894 II Rejected Being Higher
SIGNATURE OF THE TENDERING COMMITTEE.
CHAIRMAN
(RAFIQUE AHJDs1AIKH) EXECUTIVE ENGINEER
HIGHWAYS DIVISION SUKKUR
MEMBER MEMBER
(WAHEED BUX QASMI) (ABDUL HAFZ MEMON) ASSISTANT ENGINEER ASSISTANT ErG1NEER
HIGHWAYS SUB-DIVISION PUBLIC HEALTH EPG: SUB-DIVISION ROHRI ROHRI
MIS MAHTAM ENTERPRISES
RATE AMOUNT JT
AMOUNT
MIS MUHAMMAD MALOOK KATO SR NO
DESCRIPTION ESTZMATE RATE
(A) Total Cost as per Estim.i1' (B) Total as per Tender
Saving (A 131 Percentage Saving
A.A Amount Lowest Tender Amount
Saving Over &A
9481856 9335052
146804 1.55
9500000 9335052
164948
PART "B 202703 201523 203246 Therefor 4 x 810812 x 4 806092 x 4 812984
GRAND TOTAL A+B 9381856 9335052 9392445
ADD: CONTIGENCY (LUM-SUM) 100000
The Lowest Raws Qouted By M/S MAHTAM ENTERPRISES Government Contractor are:-
PART "A" (i Rs. 7.50°k Above (Rupees Seven Point Fifty Percent Above) PART "B" à Rs. 17% Above (Rupees Seventeen Percent Above)
Lowest Rates are Recommended for Approval
ON
B-DIVIjÔ
!WA1WflBUX QASMI)1 ASSISTANT ENGINEER
i-HG HWAYS SUB-DIVISIO R OH RI
A 's TA NT PUBLIG HEALT
NANJL UOMPARA1WTAIFJL Ir
NAME OF WORK: - CONSTRUCTION OF ROAD FROM ARIF KHAN TO VILLAGE SHER MUHAMMAD KHOKHAR MILE O/OO/7.
PART 'A" (ROAD WORK
I Amount of Schedule "B' 8416739 8416739 8416739
2 Add: 8 % Above () 573339 7.50% Above (j 631255 8.10% Above (4) 681756
3 Ded: Duff Cost of Bitumen F) 519034 519034 519034
PART "A" 8571044 8528960 8579461
PART "B (3 SPAN CULVERTS
I AmountofSchedule"B" 172242 172242 - 172242
2 Premium - 17% Above (+) 29281 18% Abovo 31004
3 Cartage of Material (+) 30461
EXECUTIVE ENe1, GI-(WAYS DIvso
TENDER REFERENCE NO.
NAME OF PROCURING
NAME OF WORK
N.I.T No. EE/HW-D/TC/ 503 Dated. 04.12.2017
EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
CONSTRUCTION OF ROAD FROM ARIF KHAN TO VILLAGE SHER MUHAMMAD KHOKHAR MILE 0/0-
0/7.
SR. NAME OF FIRM! BIDDERS N.T.N
REGISTRATION SINDU BOARD RELEVANT TURNOVER OF AT LEAST LAST
FUNDS! 05%
EARNEST TENDER FEEl COST BIDDING
NO. WITH P.E.0 OF E.EVENUE EXPERIENCE THREE YEARS
BUDGET MONEY DOCUMENT
I MIS MAHTAM ENTERPRISES Available Registered Registered Available Available Available Available Deposited
2 MIS MUHAMMAD MALOOK KATO Available Registered Rstered Available Available Available Available Deposited
CHAIRMAN MEMBER MEMBER
(WAHEED flUX QASMI) ASSISTANT ENGI NEER
HIGHWAYS SUB-D I VISION RO H Ri
(RAFIQUE AHME$HIKHJ EXECUTIVEGINEER HIGHWAYS DIVISION
SIJKKUR
(ABDUL HAFEEZ MEMON) ASSISTANT ENGINEER
PUBLIC HEALTH ENGG: SUB-DIVISION ROHRI
SATTENDANCE SHEET OF PARTICIPATION IN TENDER PROCESS IN EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
NAME OF WORK: - CONSTRUCTION OF ROAD FROM GULAN SHAH TO GUDPUR ROAD AT VILLAGE GUDPUR MILE 0/0-0/6+330.
EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR HELD ON 22.12.2017
rsn. NAME OF CONTRACTOR SIGNATURE
1 M/S AL-MUZAMIL SHAIKH CONS'fl': & Co.
AL.MUZA CONSTRUTION & CO:
GOVT:CONTICTOR Prop Mad Alt
2 M/SNAJAFENTERPRISES
3 M/S SAAD KHOKHAR ENTERPRISES
CHAIRMAN
(RAFIQUE AHMEIISHAIKH) EXECUTIVE ENGINEER
HIGHWAYS DIVISION SUKKUR
MEMBER MEMBER
(WAHEED BUX QASMI) (ABDUL HAF MEMON) ASSISTANT ENGINEER ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION PUBLIC HEALTH ENGG: SUB-DIVISION ROHRI ROHRI
r Name of Procuring Agency Executive Engineer Highways Division Sukkur
2 Tender Reference No. N.I.T No. EE/HW-D/TC/ 503 Dated. 04. 12.2017
3 Tender Description! Name of Work/ Item CONSTRUCTION OF ROAD FROM GULAN SHAH TO GUDPUR ROAD AT VILLAGE GIJDPUR MILE 0/0-0/6 + 330.
4 Method of Procurement Single Stage (By Competitive Rate/ Bid)
5 Tender Published Published in (i)Daily Awami Awaz Karachi Dated. 07.12.2017
(ii) Daily Express Karachi Dated. 07.12.2017 (iii) Daily Dawn Karachi Dated. 07.12.2017 (iv) Daily Sobh Karachi Dated. 07. 12.20 17
SPPRA ID NO:2 147483647 S.No. 35535 Dated: 05-12-2017
6 Total Document Sold 03 Nos.
7 Total Bids Received 03 Nos.
8 Technical Bid Opening Date (If ADplicable)
--
9 No of Bid Technically Qualified (If Applicable)
01 No.
10 Bids Rejected 02 Nos.
11 Financial Bid Opening Date 22.12.2017
BID EVALUATION REPORT
COST RANKING IN COMPARISON REASONS FOR SR # NAME OF FIRM OF BIDDER OFFERED BY TERMS OF WITH ESTIMATE ACCEPTANCE! REMARKS
THE BIDDER COST COST (SAVING) REJECTION
1 M/S ALMUZAMIL SHAIKH CONSTF: & CO.
9657365 1st Lowest 229736 Accepted Being Lowest
2 M/S NAJAF ENTERPRISES 9758791 2nd Higher 128310 Rejected Being Higher
3 M/S SAAD KHOKHAR ENTERPRISES
9827228 3rd Highest 59873 Rejected Being Highest
SIGNATURE OF THE TENDERING COMMITTEE.
CHAIRMAN
(RAFIQUE AHMED .HAIKH) EXECUTIVE ENINEER HIGHWAYS DIVISION
SUKKUR
MEMBER MEMBER
(WAHEED BUX QASMI) ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION ROH RI
(ABDUL HAFEEZ MEMON) ASSISTANT ENGINEER
PUBLIC HEALTH ENGG: SUB-DIVISION ROHRI
PART "C" 542920 540446 544252 548058
GRAND TOTAL A+B+C: - 9827228 9657365 9758791 9722134
ADD: ONTIGENCY (LUM-SUM) 164967
(AB0ULj : ASS aNGINER
P1iC 3•DJYISION R OH RI
(WAHEED BU)1 ASMI) ASSISTANT EUGINEER
HIGHA'S 5U3-DlVlSiON "1
I'. L' ,t\
HGHAyS DMSIO
The Lowest Rates Qouted By MIS AL-MUZAMIL SHAIKE CONSTT: & CO. Government Contractor arc:-
PART "A" ( Rs. 7.30% Above (Rupees Seven Point Thirty Percent Above) PART "B" Rs. 14% Above (Rupees Fourteen Percent Above) PART "C' @ Rs. 42% Above (Rupees Forty Two Percent Above)
Lowest Rates are Recommended for Approval
(A) Total Cost as per Estimate (B) Total as per Tender
Saving (A+B) Percentage Saving
A.A Amount Lowest Tendef Amount
Saving Over A.A
9887101 •9657365
229736 2.32
10000000 9657365 342635
FINANCIAL REWE%* / COMPARATIVE STATEMNL SK-047
NAME OF WORK: - CONSTRUCTION OF ROAD FROM GULAN SHAH TO GUDPUR ROAD AT VILLAGE GUDPUR MILE 0/0-0/6+330'.
SR NO
DESCRIPTION ESTIMATE M/S AL-MUZAMIL SHAIKH CONSTT: & CO.
M/S NAJAF ENTERPRISES MIS SAAD ENTERPRISES
KHOKHAR
RATE AMOUNT RATE ] AMOUNT [] RATE AMOUNT
PART "A" (ROAD WORK
1 Amount of Schedule "B" 8248396 8248396 8248396 8248396
2 Add: 8% Above 659872 7.30% Above (+) 602133 8.40% Above (+) 692865 9.10% Above(+) 750604
3 Ded: Duff Cost of Bitumen 519034 519034 519034 519034
PART "A 8389234 8331495 8422227 8479966 PART "B" (3' SPAN CULVERTS
I Amount of Schedule "B" 172242 172242 172242 172242
2 Permium -- 14% Above (+) 24114 15% Above (+) 25836 16% Above (+) 27559
3 Add: Cartage of Material (+) 25253
PART "B" 197495 196356 198078 199801 x4 = 789980 x 4 = 785424 x 4 792312 x4 799204
PART "B" (STONE PITCHI1JG 1 Amount of Schedule "B" 380596 380596 380596 380596 2 Fermium -- 42% Above (+) 159850 43% Above (+) 163656 44% Above (+) 167462 3 Add: Cartage of Material (+) 162324
TENDER REFERENCE NO.
NAME OF PROCURING
NAME OF WORK
S QALI'ICA'rIWJ
N.I.T No. EE/HW-D/TC/ 603 Dated. 04.12.20 17
EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
CONSTRUCTION OF ROAD FROM GULAN SHAH TO GUDPUR ROAD AT VILLAGE GUDPUR MILE 0/0-
0/6+330.
SR. F REGIS'RATION SINDH BOARD RELEVANT TURNOVE OF
FUNDS! 05% TENDER FEE!
NO. NAME OF FIRM! BIDDERS N.T.N
WITH P.E.0 OF REVENUE EXPERIENCE AT LEAST AST
BUDGET EARNEST COST BIDDING
THREE YEARS MONEY DOCUMENT
I MIS AL-MUZAMIL SHAIKH CONSTT: &
-Co.
Available Registered Registered Available Available Available Available Deposited
2 MIS NAJAF ENTERPRISES Available Registered Registered Available Available Available Available Deposited
3 M/S SAAD KHOKHAR ENTERPRISES Available Registered Registered Available Available Available Available Deposited
CHAIRMAN MEMBER MEMBER
(RAFIQUE AHM IKH) EXECUTIVE ENGINEER HIGHWAYS DIVISION
SUKKUR
(WAHEED BUX/QASMI) ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION ROHRI
'in (ABDUL HAFBZ MEMON)
ASSISTANT ENGINEER PUBLIC HEALTH ENGG: SUB-DIVISION
ROHRI
ATTENDANCE SHEET OF PARTICIPATION IN TENDER PROCESS IN EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
NAME OF WORK: - CONSTRUCTION OF PAVER BLOCK FLOORING & DRAINS AT PUNHAL KHOSO (KHOSA MUHALLA) AND LAGHARI MUHALLA VILLAGE DREHA (REMAINING WORK).
EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR HELD ON 22.12.2017
SR. NO.
NAME OF CONTRACTOR SIGNATURE
1 M/S SAQIB RASHEED & Co
t SAQ EED & CO Pr.4
2 M/S ALl BUILDERS
3 M/S JAN MUHAMMAD NAREJO
J/S JAN !UH t' .' NAREJO Gove rm •rttractor
op etor
CHAIRMAN
(RAFIQUE AH3E SHAIKH) EXECUTIVE ENGINEER
HIGHWAYS DIVISION SUKKUR
MEMBER MEMBER
(ABDUL HAPLZAEMON ASSISTAN GINEER
PUBLIC HEALTH ENGG: SUB-DIVISION ROHRI
(WAHEED BUX QASMI) ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION ROHRI
I-
&
J_QEVALjLLLQN REPORT SK-030
1 Name of Procuring Agency Executive Engineer Highways Division Sukkur
2 Tender Reference No. N.I.T No. EE/HW-D/TC/ 503 Dated. 04.12.2017
3 Tender Description/ Name of Work/ Item CONSTRUCTION OF PAVER BLOCK FLOORING & DRAINS AT PUNHAL KHOSO (KHOSA MUHALLA) AND LAGHARI MUHALLA VILLAGE DREHA EREMAININf WORICL
4 Method of Procurement Single Stage (By Compeiitive Rate! Bid)
5 Tender Published Published in (i)Daily Awami Awaz Karachi Dated. 07.12.2017
(ii) Daily Express Karachi Dated. 07.12.2017 (iii) Daily Dawn Karachi Dated. 07.12.2017 (iv) Daily Sobh Karachi Dated. 07.12.2017
SPPRA ID NO:2 147483647 S.No. 35535 Dated: 05-12-2017
6 Total Document Sold 03 Nos.
7 Total Bids Received 03 Nos.
8 Technical Bid Opening Date (Ii Aoølicablel
--
9 No of Bid Technically Qualified (If Applicable)
01 No.
10 Bids Rejected 02 Nos.
11 Financial Bid Opening Date 22.12.2017
BID EVALUATION REPORT
NAME OF FIRM OF BIDDER COST
OFFERED BY RANKING IN TERMS OF
COMPARISON WITH
REASONS FOR ACCEPTANCE/ REMARKS
THE BIDDER COST ESTIMATE REJECTION COST
1 M/S SAQIB RASHEED & CO
4848688 ls Lowest 119878 Accepted Being Lowest
2 MIS AL! BUILDERS 4990682 2"' Higher -22116 Rejected Being Higher
3 M/S JAN MUHAMMAD NAREJO
5087561 3d Highest -fl8995 Rejected Being Highest
SIGNATURE OF THE TENDERING COMMITTEE.
CHAIRMAN
(R.AFIQUE AHM1PSHAIKH) EXECUTINGINEER
HIGHWAYS DIVISION SUKKUR
MEMBER MEMBER
(WAHEED BUX QASMI) ASSISTANT ENGIWEER
HIGHWAYS SUB-DIVISION ROHRI
(ABDUL HA'EZ MEMON) ASSISTANT ENft1NER—
PUBLIC HEALTH ENlbB-DIVISION ROHRI
(A) Total Cost as per Estimate (B) Total as per Tendcr
Saving (A+B) Percentage Saving
A.A Amount Lowest Tender Amount
Saving Over A.A
4968566 4848688
119878 2.41
5000000 4848688
151312
[AIAL_IEV1EW /SOMABATJVE STATEMNI SK-030
NAME OF WORK: - CONSTRUCTION OF PAVER BLOCK FLOORING & DRAINS AT PUNHAL KHOSO (KHOSA MUHALLA) AND LAGHARI MUHALLA VILLAGE DREHA (REMAINING WORK).
M/S JAN MUHAMMAD NAREJO SR NO
DESCRIPTION
ESTIMATE SAQIB RASHEED & CO
MIS ALl BUILDERS
RATE AMOUNT
RATE
AMOUNT
RATE AMOUNT
PART "A" ROAD WORK
1 Amount of Schedule "B" 4748960 4748960 4748960 4748960
2 Ded: 20% Below (on Paver Block Only) it Rs. 3424058/-
684812 2.10% Above (+) 99728 5.09% Above () 241722 7.13% Above (+) 338601
3 Add: Cartage of Material (+) 809439
GRAND TOTAL A: - 4873587 4848688 4990682 5087561
ADD: CONTIGENCY (LUM-SUM)
94979
The Lowest Rates Qouted By M/S SAQIB RASHEED & CO Government Contractor are:-
FART "A Rs. 2.10% Above (Rupees Two Point Ten Fercent Above)
Lowest Rates are Recommended for Approval
(ABDUL HI MON) ASSISTANT ENINE -
PUBLIC HEALTH EUGG. :.,IVISION ROH
I- •.'
AH1ED I3UX Q.SM) EXECUVEENIfEER ASSISTANT ENGINEER HIGHWY8bIVISION
HIGHWAYS SUB-DIVISION SUKKUR ROHRL--
TENDER REFERENCE NO.
NAME OF PROCURING
NAME OF WORK
IE s_QTJ I IOJEø
N.I.T No. EE/HW-D/TC/ 503 Dated. 04.12.2017
EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
CONSTRUCTION OF PAVER BLOCK FLOORING &. DRAINS AT PUNHAL KHOSO (KHOSA MUHALLA) AND LAGHARI MUHALLA VILLAGE DREHA (REMAINING WORK).
SR. NO.
NAME OF FIRM! BIDDERS N.T.N REGISTRATION
WITH P.E.0 SINDH BOARD OF REVENUE
RELEVANT EXPERIENCE
FTURNOVER OF AT LEAST LAST
FUNDS! BUDGET
O5Co EARNEST
TENDER FEE! COST BIDDING
I [IREE YEARS MONEY DOCUMENT
I M/S SAQII3 RASHEED & CO Available Registered Registered Available Available Available Available Deposited
2 M/S AL! BUILDERS Available Registered Registered Available Available Available Available Deposited
3 M/S JAN MIJHAMMAI) NAREJO Available Registered Registiied Available Available Available Available Deposited
CHAIRMAN MEMBER MEMBER
(RAFIQUE AHM3.DAIKH) EXECUTIVE ENGINEER HIGHWAYS DIVISION
SUKKUR
(WAHEED BUX QASMI) ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION ROHRI
(ABDUL RAf'±Z !MON) ASSISTANT ENØINEER
PUBLIC HEALTH EN(: SUB-DIVISION ROI(RI _—
S ATTENDANCE SHEET OF PARTICIPATION IN TENDER PROCESS IN EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
NAME OF WORK: - IMPR:/ RECDG: OF ROAD HAJI JADAL MAHAR MILE 0/0-0/5 UC TAMACHANI.
EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR HELD ON 22.12.2017
ri NAME OF CONTRACTOR SIGNATURE
1 M/SRH&BROTHERSCOMPANY
i ircth ; itop: Rashid Htissaiii
Govt: Coutrictor
2 M/S GHULAM MUSTAFA WASSAN
3 M/S KHALID AHMED I<HAN
CHAIRMAN
(RAFIQUE AHMED$HAIKH) EXECUTIVE ENINEER HIGHWAYS DIVISION
SUKKUR
MEMBER MEMBER
11 (WAHEED BUX QASMI) (ABDUL HAFEEZ MEMON) ASSISTANT ENGINEER ASSISTANT. ENGINEER
HIGHWAYS SUB-DIVISION PUBLIC HEALTH ENGG: SUB-DIVISION ROHRJ ROHRI
ID EVALUTION REPORT
1 Name of Procuring Agency Executive Engineer Highways Division Sukku
2 Tender Reference No. N.I.T No. EE/HW-D/TC/ 503 Dated. 04.12.2(
3 Tender Description/ Name of Work! Item IMPR:/ RECDG: OF ROAD a HAJI JADA MILE 0/0-0/5 UC TAMACHANI.
4 Method of Procurement Single Stage (By Competitive Rate! Bid)
5 Tender Published Published in (i)Daily Awami Awaz Karachi Dated. O
(ii) Daily Express Karachi Dated. 07.12.2017 (iii) Karachi Dated. 07.12.20 17 (iv) Daily Sobh Kar 07.12.2017
SPPRA ID NO:2 147483647 S.No. 35535 Dated: 05-12-2017
6 Total Document Sold 03 Nos.
7 Total Bids Received 03 Nos.
8 Technical Bid Opening Date (If Atrnlicable)
--
9 No of Bid Technically Qualified (If Applicable)
01 No.
10 Bids Rejected 02 Nos.
11 Financial Bid Opening Date 22.12.2017
BID EVALUATION REPORT
COST RANKING IN COMPARISON REASONS FOR SR # NAME OF FIRM OF BIDDER OFFERED BY TERMS OF WITH ESTIMATE ACCEPTANCE/
THE BIDDER COST COST (SAVING) REJECTION
1 M/S RH & BROTHERS COMPANY
5882504 Lowest 102496 Accepted Being Lowest
2 M/S GHULAM MUSTAFA WASSAN
5939180 21u Higher 45820 Rejected Being Higher
3 M/S KHALID AHMED KHAN 5995039 3 Highest -10039 Rejected Being Highest
SIGNATURE OF THE TENDERING COMMITTEE.
CHAIRMAN
-
(RAFIQUE AHMEDWAIKH) EXECUTIVE?(1INEER
HIGHWAY DIVISION SUKKUR
MEMBER
/
(WAHEE'1IUX c'ASMI) ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION ROHRI
MEMBER
(ABDUL HAFEEZMEMON) ASSISTAr9-ENGINEER
PUBLIC HEALTH ENGG: SUB-DIVISI ROHRI
(A) Total Cost as per Estimate (B) Total as per Tender
Saving (A+B) Percentage Saving
A.A Amount Lowest Tender Amount
Saving Over A.A
5985000 5882504
102496 1.71
6000000 5882504
117496
605 191034 191550
GRAND TOTAL A, B: - 5930443 5882504 5939180 5995039 ADD: CONTIGENCY (LUM-SUM) 54794
The Lowest Rates Qouted By M/S RH & BROTHERS COMPANY Government Contractor are:-
PART "A" Rs. 13.15% Above (Rupees Thirteen Point Fifteen Percent Above) PART "B" @ Rs. 9.50% Above (Rupees Nine Point Fifty Percent Above)
Lowest Rates are Recommended for Approval
(ABDUL HAF ASSISTANT EN
PUBLIC HEALTH ENGG. B.DIVISIO ROHRI
I(WAHt 'BUXQ; ' I ASSL ..'T ENGIN IjIGH WAYS SUB-DIVL.
• ROI-IRL.-
MO R
FINAKCIALBVIEW / COMPARATIVE STATEMNT
SK-006 - NAME OF WORK: - IMPR:/ RECDG: OF ROAD ® HAJI JADAL MAHAR MILE 0/0-0/5 UC TAMACHANI.
SR DESCRIPTION ESTIMATE NO
MIS RH S. BROTHERS COMPANY - M/S GHULAM MUSTAFA WASSAN []M/S KHALID AHMED KHAN
j RATE AMOUNT RATE AMOUNT [] RATE AMOUNT
1 Amount of Schedule "B" 5479494 5479494 5479494 5479494 2 Add: 14% Above () 767129 13.15% Above (+) 720553 14.14% Above (+) 774800 15.15% Above 830143 3 Ded:DiffCostofBitumen (-) 506148 506148 506148 506148
5748146 5803489 PART "B (3 SPAN CULVERTS
1 Amount of Schedule "B" 172242 172242 172242 172242 2 Permium -- 9.50% Above (+) 16363 10.91% Above (+) 18792 11.2 1% Above (+) 19308 3 Add: Cartage of Material (+) 17726
EXECUTIVE ENNEER I-JIGHWAYS-t1VISlON,
• SUK cUR
TENDER REFERENCE NO. N.I.T No. EE/HW.D/TC/ 503 Dated. 04.12.20 17
NAME OF PROCURING EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
NAME OF WORK IMPR:/ RECDG: OF ROAD a HAJI JADAL MAHAR MILE 0/0-0/5 UC TAMACHANI.
SR. NO.
NAME OF FIRM/ BIDDERS N.T.N REGISTRATION
WITH P.E.0 SINDH BOARD OF REVENUE
RELEVANT EXPERIENCE
TURNOVER OF AT LEAST LAST THREE YEARS
FUNDS/ BUDGET
05% EARNEST
MONEY
TENDER FEE! COST BIDDING
DOCUMENT
1 MIS RH & BROTHERS COMPANY Available Registered Registered Available Available Available Available Deposited
2 MIS OHULAM MUSTAFA WASSAN Available Registered Registered Available Available Available Available Deposited
3 MIS KHALID AHMED KHAN Available Registered Registered Available Available Available Available Deposited
CHAIRMAN MEMBER MEMBER
I
(RAFIQUE AHME8flAIKH) (WAHEED BUX QASMI) (ABDUL HAFE MEMON) EXECUTIVNGINEER ASSISTANT ENGINEER ASSISTANT ENGINEER HIGHWAYS DIVISION HIGHWAYS SUB-DIVISION PUBLIC HEALTH ENG: SUB-DIVISION
SUKKUR ROHRI ROHRI
ATTENDANCE SHEET OF PARTICIPATION IN TENDER PROCESS IN • EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
NAME OF WORK: - CONSTRUCTION OF PAVER BLOCK FLOORING & DRAIN SASTI BASTI NEAR CATTLE COLONY SUKKUR.
EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR HELD ON 22.12.2017
SR. NO.
NAME OF CONTRACTOR SIGNATURE
I M/SAIJAZALI
MIS Aiaz A% Govt Contractor
2 M/S VEERU MAL ENTERPRISES
MIS Veerui Eoterrises
3 M/S AFTAB & BROTHERS CONSTI': Co
CHAIRMAN
(RAFIQUE AHMEp-SHAIKH) EXECUTIVENGINEER
HIGHWAYS DIVISION SUKKUR
MEMBER MEMBER
i1 (WAHEED BUX QASMI) (ABDUL HAFEZMEMON) ASSISTANT ENGINEER ASSISTANTENGINEER
HIGHWAYS SUB-DIVISION PUBLIC HEALTH ENGG: SUB-DIVISION ROHRI ROHRI
S ID EVALUTION REPORT
SK-017 1 Name of Procuring Agency Executive Engineer Highways Division Sukkur
2 Tender Reference No. N.l.T No. EE/HW-D/TC/ 503 Dated. 04.12.2017
3 Tender Description/ Name of Work/ Item CONSTRUCTION OF PAVER BLOCK FLOORING & DRAIN SASTI BASTI NEAR CATTLE COLONY SUKKUR.
4 Method of Procurement Single Stage (By Competitive Rate! Bid)
5 Tender Published Published in (i)The Express Tribune Karachi Dated. 19.10.2017
(ii) Daily Sobh Karachi Dated. 19.10.2017 (iii) Daily Jang Karachi Dated. 20. 10.2017 (iv) Daily Nau Sijh Dated. 19.10.2017
SPPRA ID NO:2 147483647 S.No. 35535 Dated: 05-12-2017
6 Total Document Sold 03 Nos.
7 Total Bids Received 03 Nos.
8 Technical Bid Opening Date (If Applicable)
--
9 No of Bid Technically Qua hued (If Applicable)
01 No.
10 Bids Rejected 02 Nos.
11 Financial Bid Opening Date 22.12.20 17
BID EVALUATION REPORT
SR # NAME OF FIRM OF BIDDER COST
OFFERED BY RANKING IN TERMS OF
COMPARISON WITH
REASONS FOR ACCEPTANCE/ REMARKS
THE BIDDER COST ESTIMATE REJECTION
COST ISAVINGI
1 M/S AIJAZ ALl 4834466 l Lowest 139798 Accepted Being Lowest
2 M/S VEERU MAL ENTERPRISES
4883719 2u111 Higher 90545 Rejected Being Higher
3 M/S AFTAB &. BROTHERS CONSTT: Co
4935363 3' Highest 38901 Rejected Being 1-lighest
SIGNATURE OF THE TENDERING COMMITTEE.
CHAIRMAN
C, __ (RAFIQUE AHMEDI1KH)
EXECUTIVE EIGINEER HIGHWAYS DIVISION
SUKKUR
MEMBER MEMBER
Pc' (WAHEED BUX QASMI) (ABDUL HAFEEZ MEMON) ASSISTANT ENGINEER ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION PUBLIC HEALTH ENGG: SUB-DIVISION ROHRI ROHRI
GRAND TOTAL A: - 4878627 4834466 4883719 4935363
ADD: CONTIGENCY (LUM-SUM) 95637
The Lowest Rates Qouted By M/S AIJAZ ALt Government Contractor are:-
PART "A Rs. 1.10% Above (Rupees One Point Ten Percent Above)
Lowest Rates are Recommended for Approval
(A) Total Cost as per Estimate (B) Total as per Tender
Saving (A+B) Percentage Saving
A.A Amount Lowest Tender Amount
Saving Over A.A
4974264 4834466
139798 2.81
5000000 4834466
165534
FINATLCIAL REVIEW /_c_QMARATIvE SThTEMNT.
NAME OF WORK: - SKO17I
CONSTRUCTION OF 1AVER BLOCK FLOORING & DRAIN SASTI EAST! NEAR CATTLE COLONY SUKKUR.
SR NO
DESCRIPTION ESTIMATE M/S AIJAZ ALl ]
L MIS VEERU MAL ENTERPRISES MIS AFTAB & BROTHERS CONSTT:
CO
RATE -
AMOUNT RATE AMOUNT [11 RATE AMOUNT
PART A" (ROAD WORK
1 Amount of Schedule"13' 4781865 4781865 4781865 4781865
2 Dcd: 20% Below (on Paver Block Only) n Rs. 3505963/-
701192 1.10% Above (+) 52601 2.13% Above (+) 101854 3.21% Above (+) 153498
3 Add: Cartage of Material (+) 797954
!ABDUL HAFEZION ASSISTANT ENGINEER
PUBL!C i1EAL' EGG: SW1.DIVISION IOHRI
(WAHEED BUX QASMI) ASS(STANT ENGNEER
HIGHWAYS SUB-DlVlS)O R OH RI
EXECUTIVE EfitNER HIGHWAYS DV!S!ON
3UKKUR
S N.I.T No. EE/HW-D/TC/ 503 Dated. 04.12.2017
EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
TENDER REFERENCE NO.
NAME OF PROCURING
NAME OF WORK
CONSTRUCTION OF PAVER BLOCK FLOORING & DRAIN SASTI BASTI NEAR CATTLE COLONY SUKKUR.
--
- TURNOVER OF O5° TENDER FEE! R. 0.
NAME OF FIRM/ BIDDERS N.T.N REGISTRATION
WITH P.E.0 SINDH BOARD OF REVENUE
RELEVANT EXPERIENCE]
AT LEAST LAST THREE YEARS
FUNDS / BUDGET
EARNEST MONEY
COST BIDDING DOCUMENT
S N
1 M/S AIJAZ ALl Available Registered Registered Available Available Avaihibic Available Deposited
2 M/S VEERU MAL ENTERPRISES Available Registered Registered Available Available Available Available l)eposited
3 MIS AFIAB & BROTHERS CONSTr: CO
Available Registered Registered Available Available Available Available Deposited
CHAIRMAN MEMBER MEMBER
(RAFIQUE AHMED S EXECUTIVNINEER HIGHWAYS DIVISION
SUKKUR
(WAHEED BUX (ASMI) ASSISTANT ENdINEER
HIGHWAYS SUB-DIVISION RO H RI
(ABDULHAP3ME ON) ASSISTANT ENGINEER
PUBLIC HEALTH ENGO: SUB-DIVISION ROIRI
• ATTENDANCE SHEET OF PARTICIPATION IN TENDER PROCESS IN 4 EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
NAME OF WORK: - CONSTRUCTION OF PAVER BLOCK FLOORING & DRAINS @ BASHIRABAD UC TAMACHANI.
EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR HELD ON 22.12.2017
SR. NO.
NAME OF CONTRACTOR SIGNATURE
1 M/S AGHA GUL HASSAN KHAN
ovt: Co an' * -
ractor
2 M/S ADEEL AHMED CONSTRUCTION COMPANY
3 M/SASIFALI
IYL!S LS F ALl
CHAIRMAN
p. (RAFIQUE AHME98FIAIKH)
EXECUTIGINEER HIGHWAYS DIVISION
SUKKUR
MEMBER MEMBER
(WAHEED BUX QASMI) (ABDUL HAFEEZMEMON) ASSISTANT ENGINEER ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION PUBLIC HEALTH ENGG: SUB-DIVISION ROHRI ROHRI
jD LY.AJU LLQ±4. R T
1 Name of Procuring Agency Executive Engineer Highways Division Sukkur
2 Tender Reference No. N.1.T No. EE/HW-D/TC/ 503 Dated. 04.12.2017
3 Tender Description! Name of Work! Item CONSTRUCTION OF PAVER BLOCK FLOORING & DRAINS @ BASHIRABAD UC TAMACHANI.
4 Method of Procurement Single Stage (By Competitive Rate! Bid)
5 Tender Published Published in (i)Daily Awazni Awaz Karachi Dated. 07.12.20 17
(ii) Daily Express Karachi Dated. 07.12.2017 liii) Daily Dawn Karachi Dated. 07.12.2017 (iv) Daily Sobh Karachi Dated. 07.12.2017
SPPRA ID NO:2 147483647 S.No. 35535 Dated; 05-12-2017
6 Total Document Sold 03 Nos.
7 Total Bids Received 03 Nos.
8 Technical Bid Opening Date (If AplicabIe)
--
9 No of Bid Technically Qualified (If Applicable)
01 No.
10 Bids Rejected 02 Nos.
11 Financial Bid Opening Date 22. 12.2017
BID EVALUATION REPORT
COST RANKING IN COMPARISON REASONS FOR SR # NAME OF FIRM OF BIDDER OFFERED BY TERMS OF WITH ESTIMATE ACCEPTANCE! REMARKS
THE BIDDER COST COST (SAVING) REJECTION
1 MIS AGHA GUL HASSAN ((HAN
4811246 1 Lowest 123754 Accepted Being Lowest
2 M/S ADEEL AHMED CONSTRUCTION COMPANY
4882000 2 Higher 53000 Rejected Being Higher
3 M/S ASIF AL! 4940961 3 Highest -5961 Rejected Being Highest
SIGNATURE OF THE TENDERING COMMITTEE.
CHAIRMAN
(RAFIQUE AHMED$M1IKH) EXECUTIV)thNEER HIGHWAYS DIVISION
SUKKUR
MEMBER
\4çC (WAHEED BUX QASMI) ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION ROHRI
MEMBER
(ABDUL HAFE Z- IE1V1GN1 ASSISTANT EG1EER
PUBLIC HEALTH ENGG: SUB-DIVISION ROHRI
(A) Total Cost as per Estimatc (B) Total as per Tender
Saving (A+B) Percentage Saving
A.A Amount Lowest Tender Amount
Saving Over AA
4935000 4811246
123754 2.51
5000000 4811246
188754
(WAH EE UX'QMi' ASSISTANT ENG:NE"
HIGHWAYS tnv; k U;
EXEC UTIVE~1tER HIGHWAY IVISION
SUKKUR (ABOUL HAF
ASSISTANTE NEER PUBLIC HEALTH ENGG: SUB.D)VISIOH
ROHR
FINArCIAL fEVIEW / COMPARATIVJ STATEMNT
NAME OF WORE: - CONSTRUCTION OF PAVER BLOCK FLOORING & DBAINS BASHIRABAD UC TAMACHANI.
MIS AGHA GUL HASSAN KHAN M/S ADEEL AHMED CONSTRUCTION COMPANY SR
NO
M/S ASIF ALl
RATE AMOUNT DESCRIPTION ESTIMATE
RATE AMOUNT J RATE AMOUNT
PART "A" (ROAD WORK
I Amount of Schedule"B' 4716908 4716908 4716908 4716908
2 Ded: 20% Below (on Paver Block Only) n Rs. 353393 1/-
706786 2% Above (+) 94338 3.50% Above (+) 165092 4.75% Above (+) 224053
3 Add: Cartage of Material (4) 830830
GRAND TOTAL A, B, C:- 4840952 4811246 4882000 4940961
ADD: CONTIGENCY (LUM-SUM) 94338
The Lowest Rates Qouted By M/S AGHA GUL HASSAN KHAN Government Contractor are:-
PART "A" Rs. 2% Above (Rupees Two Percent Above)
Lowest Rates are Recommended for Approval
4.
TENDER REFERENCE NO.
NAME OF PROCURING
NAME OF WORK
x Q IXXCATION
N.I.T No. EE/HW-D/TC/ 503 Dated. 04.12.2017
EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
CONSTRUCTION OF PAVER BLOCK FLOORING & DRAINS a BASHIRABAD UC TAMACHANI.
NO.
-
NAME OF FIRM/ BIDDERS N.T.N REGISTRATION
WITH P.E.0 SINDH BOARD OF REVENUE
RELEVANT EXPERIENCE
TURNOVER OF AT LEAST LAST
FUNDS/ BUDGET
O5 EARNEST
TENDER FEEl COST BIDDING
THREE YEARS MONEY DOCUMENT __ I - -,
1 MIS AGHA GUL HASSAN KHAN Available Registered Registered Available Available Available Available Deposited
2 M/S ADEEL AUMEI) CONSTRUCTION COMPANY
Available Registered Registered Available Available Available Available Deposited
3 M/S ASIF ALl Available Registered Registered Available Available Available Available Deposited
CHAIRMAN MEMBER MEMBER
/
(ABDUL HAFJ!.1EMON) ASSISTANT ENGINEER
PUBLIC HEALTH ENGG: SUBDWISION ROHRI
(RAFIQUE AHMED$&IKH) EXECUTIVE ItINEER HIGHWAYS DIVISION
SUKKUR
(WAHEED BUX QASMI) ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION ROHRI
0 ATTENDANCE SHEET OF PARTICIPATION IN TENDER PROCESS IN EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
NAME OF WORK: - CONSTRUCTION OF PAVER BLOCK FLOORING & DRAINS (à HAIDER SHAH MUHALLA VILLAGE GOSERJI UC TAMACHANI.
EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR HELD ON 22.12.2017
SR. NO.
NAME OF CONTRACTOR SIGNATURE
1 M/SMAI-ITAM ENTERPRISES
M 1S iA cpg15E
GOVT; cOfACTA
2 M/SBEDILBECUS
M7s (Be i1(Becus çjovt: Contractor
CHAIRMAN
(RAFIQUE AH1jY SHAIKH) EXECUTIVENGINEER HIGHWAYS DIVISION
SUKKUR
MEMBER MEMBER
I
(WAHEE BUX QASMI) ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION ROHRI
(ABDUL HAEZ MEMON) ASSISTANT ENGINEER
PUBLIC HEALTH ENGG: SUB-DIVISION ROHRI
BID EVALTION REPQRI
1 Name of Procuring Agency Executive Engineer Highways Division Sukkur
2 Tender Reference No. N.I.T No. EE/HW-D/TC/ 503 Dated. 04.12.20 17
3 Tender Description/ Name of Work! Item CONSTRUCTION OF PAVER BLOCK FLOORING & DRAINS i HAIDER SHAH MUHALLA VILLAGE GOSERJI UC TAMACHANI.
4 Method of Procurement Single Stage (By Competitive Rate/ Bid)
5 Tender Published Published in (i)The Express Tribune Karachi Dated. 19. 10.2017 (ii) Daily Sobh Karachi Dated. 19.10.2017 (iii) Daily Jang Karachi Dated. 20.10.2017 (iv) Daily Nau Sijh Dated. 19.10.2017
SPPRA ID NO:2 147483647 S.No. 35535 Dated: 05-12-20 17
6 Total Document Sold 02 Nos.
7 Total Bids Received 02 Nos.
8 Technical Bid Opening Date (If ADolicable)
--
9 No of Bid Technically Qualified (If Applicable)
01 No.
10 Bids Rejected 01 Nos.
11 Financial Bid Opening Date 22.12.2017
BID EVALUATION REPORT
COST RANKING IN COMPARISON REASONS FOR SR # NAME OF FIRM OF BIDDER OFFERED BY TERMS OF WITH ESTIMATE ACCEPTANCE/ REMARKS
THE BIDDER COST COST (SAVING) REJECTION
1 M/S MAHTAM ENTERPRISES
4875271 l Lowest 118729 Accepted Being Lowest
2 MIS BEDIL BECUS 4926393 2 Higher 67607 Rejected Being Higher I
SIGNATURE OF THE TENDERING COMMITTEE.
CHAIRMAN
(RAFIQUE AHMEDAIKH) EXECUTIVE1(INEER
HIGHWAYS DIVISION SUKKUR
MEMBER
(WAHEED BUX 'ASMI) ASSISTANT EGINEER
HIGHWAYS SUB-DIVISION ROHRI
MEMBER
(ABDUL HA'FEZ MEMQ ASSISTANT DINtER
PUBLIC HEALTH ENGG: SUB-DIVISION ROHRI
SR NO
DESCRIPTION
ESTIMATE
M/S MAHTAM ENTERPRISES MIS BEDIL BECUS
RATE AMOUNT RATE ir AMOUNT
(A) Total Cost as per Estimate (B) Total as per Tender
Saving (A+B) Percentage Saving
A.A Amount Lowest Tender Amount
Saving Over A.A
4994000 4875271
118729 2.38
5000000 4875271
124729
GRAND TOTAL A, B, C: - 4900623 4875271 4926393
ADD: CONTIGENCY (LUM-SUM) 92950
The Lowest Rates Qouted By M/SMAHTAM ENTERPRISES Government Contractor are:-
Part A' l Rs. 4.90% Above (Rupees Four Point Ninety Percent Above)
Lowest Rates arc Recommended for Approval
IABOULHA Z Ms F ASSISTANT E ; - ER PUBUC HEALTH EN : SUB•DIVISIO
ROHRI
ASSISTANT ENGINEER HH WAYS SUBDI VISION
ROHRI
FINANLL_REVIEW / COMPARATIVE STATJVINL
NAME OF WORK: - CONSTRUCTION OF PAVER BLOCK FLOORING & DRAINS a HAIDER SHAH MUHALLA VILLAGE
GOSERJI UC TAMACHANI.
I Amount of Schedule"B" 4647541 4647541 4647541
2 Ded: 20% Below (on Paver Block Only) n
Rs.3238671/- 647734 4.90% Above (+) 227730 6% Above (~) 278852
3 Add: Cartage of Material (+) 900816
HIGH WA?S DIVISION SUKKUR
TENDER REFERENCE NO.
NAME OF PROCURING
NAME OF WORK
Oil XX XQ?
N.I.T No. EE/HW-DfTC/ 503 Dated. 04.12.20 17
EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
CONSTRUCTION OF PAVER BLOCK FLOORING & DRAINS a HAIDER SHAH MUHALLA VILLAGE GOSERJI UC TAMACHANI.
SR. NAME OF FIRM/ BIDDERS N.T.N 7 REGISTRATION [NDH BOARD RELEVA7
TURNOVER OF AT LEAST LAST
FUNDS/ 05%
EARNEST TENDER FEE/ COST BIDDING
NO. WITH P.E.0 I OF REVENUE EXPERIENCE I THREE YEARS BUDGET
MONEY DOCUMENT
I MIS MAHTAM ENTERPRISES Available Registered Registered Available Available Available Available Deposited
2 MIS BEDIL BECUS Available Registered Registered Available \vailable Available Available Deposited
CHAIRMAN MEMBER MEMBER
14 /, (AJ3DUL HAF Z MEMON)
ASSISTANT ENGINEER PUBLIC HEALTH ENOG; SUB-DIVISION
ROHRI
(RAFIQUE AHMEDSIKH) EXECTJTIVE.-.EIcGINEER HIGHWAYS DIVISION
SUKKUR
(WAHEED BUX QASMI) ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION ROHRI
S ATTENDANCE SHEET OF PARTICIPATION IN TENDER PROCESS IN EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
NAME OF WORK: - CONSTRUCTION OF PAVER BLOCK FLOORING AND DRAINS FROM AL! MOHAMMAD KHOKHAR HOUSE TO KHALID HUSSAIN MAKO HOUSE GOLIMAR SUKKUR UC-20.
EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR HELD ON 22.12.2017
SR. NO.
NAME OF CONTRACTOR SIGNATURE
1 M/SAJMAN ENTERPRISES
2 M/S AKHTAR ALl SOOMRO
3 M/S MUHAMMAD SHAFIQUE
CHAIRMAN
(RAFIQUE AHMEP-SIIAIKH) EXECUTIVEINGINEER
HIGHWAYS DIVISION SUKKUR
MEMBER MEMBER
4,'
(WAHEED BUX QASMI) ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION ROHRI
(ABDUL HAF1EMON) ASSISTANT ENGINEER
PUBLIC HEALTH ENGG: SUB-DIVISION ROHRI
LI_EiL&L!LLLO. LR E PORT SK-021
1 Name of Procuring Agency Executive Engineer Highways Division Sukkur
2 Tender Reference No. N.l.T No. EE/HW-D/TC/ 503 Dated. 04.12.2017
3 Tender Description! Name of Work/ Item CONSTRUCTION OF PAVER BLOCK FLOORING AND DRAINS FROM ALl MOHAMMAD KHOKHAR HOUSE TO KHALID HUSSAIN MAKO HOUSE GOLIMAR SUKKUR UC-20.
4 Method of Procurement Single Stage (By Competitive Rate! Bid)
5 Tender Published Published in (l)bally Awami Awaz Karachi Dated. 07.12.20 17
(ii) Daily Express Karachi Dated. 07.12.2017 (iii) Daily Dawn Karachi Dated. 07.12.2017 (iv) Daily Sobh Karachi Dated. 07.12.2017
SPPRA ID NO:2 147483647 S.No. 35535 Dated: 05-12-20 17
6 Total Document Sold 03 Nos.
7 Total Bids Received 03 Nos.
8 Technical Bid Opening Date (If Aonlicable)
--
9 No of Bid Technically Qualified (If Applicable)
01 No.
10 Bids Rejected 02 Nos.
11 Financial Bid Opening Date 22. 12.2017
BID EVALUATION REPORT
COST RANKING IN I COMPARISON I I I REASONS FOR
SR # NAME OF FIRM OF BIDDER OFFERED BY TERMS OF WITH I ACCEPTANCE! REMARKS
THE BIDDER COST ESTIMATE [COSTiSAVINGI]
REJECTION
1 M/S AJMAN ENTERPRISES 4873347 151 Lowest 125352 Accepted Being Lowest
2 M/S AKHTAR AL! SOOMRO 4946083 2 Higher 52616 Rejected Being Higher
3 M/S MUHAMMAD SHAFIQUE
5000393 3f1 Highest -1694 Rejected Being Highest
SIGNATURE OF THE TENDERING COMMITTEE.
CHAIRMAN
(RAFIQUE AHMED IKH) EXECUTIVE INEER
HIGHWAYS DIVISION SUKKUR
MEMBER MEMBER
Th (ABDUL HAFE Z MEMON)
ASSISTANT ENGEER PUBLIC HEALTH ENG& SUB-DIVISION
ROHRI
(WAHEED BUX\QASMI) ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION ROHRI
RATE AMOUNT RATE 1 AMOUNT
M/S AJMAN ENTERPSES M/S AKETAR ALl SOOMRO M/S MUHAMMAD SHAFIQUE DESCRIPTION ESTIMATE
(A) 'l'otal Cost as per Estimate (B) Total as per Tender
Saving (A+B) Percentage Saving
A.A Amount Lowest Tender Amount
Savmg Over A.A
4998699 4873347
125352 2.51
5000000 4873347
126653,
EXECUEh EER HJGI1WAYJ DIS/)SION
KUR
(ABDULHAEtZMr 0 ASSISTAoEN R
PUBLIC HEALTH EN -. UB.OIVIS)ON RQiR
(WAHEED BUX ASSISTANT ENGI
FIIGHWAYSSUBDI." ---ROHRI
FINALEV1EW / COMPARAflVE STATEMNT
SK-02 1 NAME OF WORK: - CONSTRUCTION OF PAVER BLOCK FLOORING AND DRAINS FROM ALl MOHAMMAD KHOKHAR HOUSE TO
KHALID HUSSAIN MAKO HOUSE GOLIMAR SUKKUR UC-20.
PART "A' (ROAD WORK
I AmountofSchedule"B' 4849101 4849101 4849101 4849101
2 Ded: 20% Below (on Paver Block Only) n Rs. 3745688/-
749138 0.50% Above (+) 24246 2% Above (+) 96982 3.12% Above (+) 151292
3 Add: Cartage of Material (+) 801754
GRAND TOTAL A, B, C: - 4901717 4873347 4946083 5000393
ADD: CONTIGENCY (LUM-SUM) 96982
The Lowest Rates Qouted By MIS AJMAN ENTERPRISES Government Contractor are:-
'ART "A" Rs. 0.50% Above (Rupees Zero Point l?ifty Percent Above)
Lowest Rates are Recommended for Approval
EXECI N3 HIGH WAYS-c1VISION
$UKWR
TENDER REFERENCE NO.
NAME OF PROCURING
NAME OF WORK
I J I.A?JCLON
N.I.T No. EE/HW-D/TC/ 503 Dated. 04.12.2017
EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
CONSTRUCTION OF PAVER BLOCK FLOORING AND DRAINS FROM AL! MOHAMMAD KHOKHAR HOUSE TO KHALID HUSSAIN MAKO HOUSE GOLIMAR SUKKUR UC-20.
¶
SR. NO.
NAME OF FIRM/ BIDDERS NT N REGISTRATION
WITH P.E.0 SINDH BOARD RELEVANT OF REVENUE EXPERIENCE
TURNOVER OF AT LEAST LAST
FUNDS/ BUDGET
05% EARNEST
TENDER FEE/ COST BIDDING
g
THREE YEARS MONEY DOCUMENT
1 MIS AJMAN ENTERPRISES Available Registered Registered Available Available Available Available Deposited
2 MIS AKHTAR ALl SOOMRO Available Registered Registered Available Available Available Available Deposited
3 M/S MUHAMMAD SI-lAFlQUE Available Registered Registered Available Available Available Available Deposited
CHAIRMAN MEMBER MEMBER
(Th (ABDUL HA Z MEMON)
ASSISTANT ENGINEER PUBLIC HEALTH ENGG: SUB-DIVISION
ROHRI
(RAFIQUE AHMED SIWKH) EXECUTIVE EN9II(EER HIGHWAYS DIVISION
SUKKUR
(WAHEED BUX QASMI) ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION ROHRI
S ATTENDANCE SHEET OF PARTICIPATION IN TENDER PROCESS IN EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
NAME OF WORK: - CONSTRUCTION OF ROAD FROM ARRORE BACHAL SHAH ROAD TO JANOJI VIA VILLAGE MIR SHAHID HUSSAIN TALPUR MILE 0/0-0/4 (0.80 KM).
EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR HELD ON 22.12.2017
SR. NO.
NAME OF CONTRACTOR SIGNATURE
1 M/S ZAWAR IBRAHIM BHAMBHRO
1.ia " UHI
OL'I )1j,,Iiaett'?
2 M/S MUHIB ALT SADHAYO
CHAIRMAN
(RAFIQUE AHMED HAIKH) EXECUTIVE E)KcINEER
HIGHWAYSDIVISION SUKKUR
MEMBER MEMBER
-, (WAHEED BUX QASMI) ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION ROHRI
(ABDUL HAFEEZ MEMON) ASSISTANT ENGINEER
PUBLIC HEALTH ENGG: SUB-DIVISION ROHRI
S BJ EVLUTION REPORT
1 Name of Procuring Agency Executive Engineer Highways Division Sukkur
2 Tender Reference No. N.I,T No. EE/HW-D/TC/ 503 Dated. 04.12.2017
3 Tender Description/ Name of Work/ Item CONSTRUCTION OF ROAD FROM ARRORE BACHAL SHAH ROAD TO JANOJI VIA VILLAGE MIR SHAHID HUSSAIN TALPUR MILE 0/0-0/4 (0.80 KM).
4 Method of Procurement Single Stage (By Competitive Rate! Bid)
5 Tender Published Published in (i)Daily Awarni Awaz Karachi Dated. 07.12.20 17
(ii) Daily Express Karachi Dated. 07.12.2017 (iii) Daily Dawn Karachi Dated. 07.12.2017 (iv) Daily Sobh Karachi Dated. 07.12.2017
SPPRA ID NO:2 147483647 S.No. 35535 Dated: 05-12-2017
6 Total Document Sold 03 Nos.
7 Total Bids Received 03 Nos.
8 Technical Bid Opening Date (If Applicable)
--
9 No of Bid Technically Qualified (If Applicable)
01 No.
10 Bids Rejected 02 Nos.
11 Financial Bid Opening Date 22.12.2017
BID EVALUATION REPORT
COST RANKING IN COMPARISON REASONS FOR SR U NAME OF FIRM OF BIDDER OFFERED BY TERMS OF WITH ESTIMATE ACCEPTANCE! REMARKS
THE BIDDER COST COST (SAVING) REJECTION
1 M/S ZAWAR IBRAHIM BHAMBHRO
5353048 i Lowest 44952 Accepted Being Lowest
2 M/S MUHIB AL! SADHAYO 5398074 2mf1 Higher -74 Rejected Being Higher
SIGNATURE OF THE TENDERING COMMITTEE.
CHAIRMAN
(RAFIQUE AHMEDSHAIKH) EXECUTIVE I1GINEER
HIGHWAYS DIVISION SUKKUR
MEMBER MEMBER
(WAHEEDX QPSMI) (ABDUL HAPEEZ MEMON) ASSISTANT ENGINEER ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION PUBLIC HEALTH ENOG: SUB-DIVISION ROHRI ROHRI
PART "C" 200595 199801 201179
GRAND TOTAL A+B+C:- 5398158 5353048 5398074
ADD: CONTIGENCY (LUM-SUM)
(A) Total Cost as per Estimate (B) Total as per Tendei'
Saving (A+B) Percentage Saving
A,A Amount Lowest Tender Amount
Saving Over A.A
The Lowest Rates Qouted 13v MjS ZAWAR IBRAHIM BHAMBHRO Government Contractor are:-
PART "A"@ Rs. 7.10% Above (Rupees Seven Point Ten Percent Above) PART "B" j Rs. 14.60% Above (Rupees Fourteen Point Sixty Percent Above) PART "C" @ Rs, 16% Above (Rupees Sixteen Percent Above)
Lowest Rates are Recomnmencled for Approval
5398000 5353048
44952 0.83
5400000 5353048
46952
4- EXECUTIVE ENGI R HIGHWAYS' ISION
SUKKUR
A8DIJL HAFE 'Z ,. ASSISTANTE NEER
UBUC HEAt.T EN ' SUB.DlVISIOt4 R OH RI
S
WAHEED BUX QSMI)] ASSISTANT ENGINEER L[GHWAYS SUB-DIVISIO
ROHRI
0
FJANC1AL RE'VIEW / COMPARATIVE STATEMNT
NAME OF WORK: CONSTRUCTION OF ROAD FROM ARFORE BACHAL SHAH ROAD TO JANOJI VIA VILLAGE MIR SHAHID HUSSAIN TALPUR MILE 0/0-0/4 (0.80 KM).
SR NO DESCRIPTION ESTIMATE
M/S ZAWAR IBRAtUM BHAMBMRO MIS MUHIB ALl SADHAYO
RATE AMOUNT RATE iF AMOUNT PART 'A' (ROAD WORK
1 Amount of Schedule "B" 4616775 4616775 4616775
2 Add: 8% Above (1 369342 7.10% Above (+) 327791 8% Above (+) 369342
3 Ded: Diff Cost of Bitumen (- ) 325526 325526 325526 PART "A" 660591 4619040 4660591
PART "B" (10' SPAN CULVERTS
I Amount of Schedule "B" 466149 466149 466149 2 Permium -- 14.60% Above (-) 68058 15.05% Above (+) 70155
3 Add: Cartage of Material (~) 70823 PART "B" 536972 534207 536304
PART "C" (3 SPAN CULVERTS I Amount of Schedule "B" 172242 172242 172242 2 Perinjum -- 16% Above (+) 27559 16,80% Above (+) 28937 3 Add: Cartage of Material (1 28353
TENDER REFERENCE NO.
NAME OF PROCURING
NAME OF WORK
QI
NJ.T No. EE/HW-D/TC/ 503 Dated. 04.12.20 17
EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
CONSTRUCTION OF ROAD FROM ARRORE BACHAL SHAH ROAD TO JANOJI VIA VILLAGE MIR SHAHID HUSSAIN TALPUR MILE 0/0-0/4 (0.80 KM).
SR. NO.
NAME OF FIRM! BIDDERS N.T.N REGISTRATION
WITH P.E.0 SINDH BOARD OF REVENUE
RELEVANT EXPERIENCE
TURNOVER OF AT LEAST LAST THREE YEARS
FUNDS/ BUDGET
05% EARNEST
MONEY
TENDER FEEl COST BIDDING
DOCUMENT
I MIS ZAWAR lBRAlIIM BHAMBHRO Available Registered Registered Available Available Available Available Deposited
2 M/S MUl-IIB AL! SADI IAYO Available Registered Registered Available Available Available Available Deposited
CHAIRMAN MEMBER MEMBER
/
(RAFIQUE AHMED J1TKH) EXECUTIVE ENtINEER HIGHWAYS DIVISION
SUKKUR
(WAHEED BUX QASMI) ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION ROHRI
(ABDUL HAEZ MEMON) ASSISTANT ENGINEER
PUBLIC HEALTH ENGG: SUB-DIVISION ROHRI
e ATTENDANCE SHEET OF PARTICIPATION IN TENDER PROCESS IN EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
NAME OF WORK: - CONSTRUCTION OF ROAD FORM VILLAGE LAHOTI UMED ALl SHAMBANI TO GHANTAN WARI UC DHANDHI MILE 0/0-0/5 (1 KM).
EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR HELD ON 22.12.2017
SR. NO.
NAME OF CONTRACTOR SIGNATURE
1 M/SZ.A QURESHI ( I "
MIS r1t : II
2 MIS MOLE DINO CHACHAR
M/S MOL ACHAR GOVI: CONTRACTOR
CHAIRMAN
(RAFIQUE AHME7SHAIKH) EXECUTIVE ENGINEER
HIGHWAYS DIVISION SUKKUR
MEMBER MEMBER
(WAHEED BUX QASMI) (ABDUL HAF EZ MEMON) ASSISTANT ENGINEER ASSISTANTENGINEER
HIGHWAYS SUB-DIVISION PUBLIC HEALTH ENGG: SUB-DIVISION ROHRI ROHRI
S ft PORT
1 Name of Procuring Agency Executive Engineer Highways Division Sukkur
2 Tender Reference No. NIT No. EE/HW-D/TC/ 503 Dated. 04.12.2017
3 Tender Description/ Name of Work/ Item CONSTRUCTION OF ROAD FORM VILLAGE LAHOTI UMED ALl SHAMBANI TO GHANTAN WARI UC DHANDHI MILE 0/0-0/5 (1 KM).
4 Method of l'rocurement Single Stage (By Competitive Rate! Bid)
5 Tender Published Published in (i)Daily Awanii Awas Karachi Dated. 07.12.2017 (ii) Daily Express Karachi Dated. 07.12.2017 (LU) Daily Dawn Karachi Dated. 07.12.2017 (iv) Daily sobh Karachi Dated. 07. 12.20 17
SPPRA ID NO:2 147483647 S.No. 35535 Dated: 05-12-20 17
6 Total Document Sold 02 Nos.
7 Total Bids Received 02 Nos.
8 Technical Bid Opening Date (If Aonlicablel
--
9 No of Bid Technically Qualified (If Applicable)
01 No.
10 Bids Rejected 01 Nos.
11 Financial Bid Opening Date 22.12.2017
BID EVALUATION REPORT
COST RANKING IN COMPARISON REASONS FOR SR # NAME OF FIRM OF BIDDER OFFERED BY TERMS OF WITH ESTIMATE ACCEPTANCE/ REMARKS
THE BIDDER COST COST (SAVING) REJECTION
1 M/S Z.A QURESHI 6286440 1M Lowest 174300 Accepted Being Lowest
2 M/S MOLE DINO CHACI1AR 6353762 2 Higher 106978 Rejected Being Higher
SIGNATURE OF THE TENDERING COMMITTEE.
CHAIRMAN
(RAFIQUE AHMED AJK EXECUTIVE ENGINEER
HIGHWAYS DIVISION SUKKUR
MEMBER MEMBER
(WAHEED BUX QASMI) (ABDUL HAFEEZ MEMON) ASSISTANT ENGINEER ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION PUBLIC HEALTH ENGO: SUB-DIVISION ROHRI ROHRI
TOTAL: C x2 =
PART "D" (PIPE CULVERTS) 1 Amount of Schedule "B" 2 Permiuni 3 Add: Cartage of Material
TOTAL: D
GRAND TOTAL A+B+C+D: -
193772 194806 x 2 387544 ,c 2 = 389612
26285 26285 16% Above (+) 4206 17% Above (-4.) 4468
30491 30753
6286440 6353762
194686 389372
4288 30573
26285
6345813
(+)
(ABüiji UAFEEZ . ASSISTANT NGN
P1IUCHEALTHEGG OHR1
FINANCIAL REVIEW / CQMPARATIVE STATEMNT
NAME OF WORK: - CONSTRUCTION OF ROAD FORM VILLAGE LAHOTI UMED AL! SHAMBANI TO GHANTAN WARI UC DHANDHI MILE 0/0-0/5 (1 KM).
NO DESCRIPTION
--
ESTIMATE
M/SZ.AQURESHI 7 1M/SMOLEDINOCEACHAR
RATE AMOUNT RATE AMOUNT
PART "A" (ROAD WORK 1 Amount of Schedule "B' 4428830 4428830 4428830 2 Add: 8% Above (+) 354306 7% Above (+) 310018 8.17% Above (t) 361835 3 Ded: Duff Cost of Bitumen (-) 279410 279410 279410
TOTAL: A 4503726 4459438 4511255 PART "B" (ROAD WORK
I Amount of Schedule "B' 1317492 1317492 1317492 2 Add: 14% Above (1) 184449 13%Above(+} 171274 14% Above(+) 184449 3 Ded: Dill Cost of Bitumen 1-) 79799 79799 79799
TOTAL: B 1422142 1408967 1422142 PART "C" (3' SPAN CULVERTS
1 Amount of Schedule "B" - 172242 172242 172242 2 Permium 12.50% Above (-") 21530 13.10% Above (4-) 22564 3 Add: Cartage of Material (+) 22444
ADD: CONTIGENCY (LUM-SUM) 114927
(A) Total Cost as per Estimate (B) Total as per Tender
Saving (A+B) Percentage Saving
A.A Amount Lowest Tender Amount
Saving Over A.A
6460740 6286440
174300 2.70
6500000 6286440 213560
The Lowest Rates Qouted By 4JiS Z.&9JJES_ffl Government Contractor are:-
PART "A" c Rs. 7% Above (Rupees Seven Percent Above) PART "B" @ Rs. 13% Above (Rupees Thirteen Percent Above) PART "C" Rs. 12.50% Above (Rupees Twelve Point Fifty Percent Above) PART "D" @ Rs. 16% Above (Rupees Sixteen Percent Above) Lowest Rats are Recommended for Approval
'WAHEEDBUX QASM)1 ASSISTANT l- GHWAYS Su ..
RO H R
SlG:., WAYS )VS)ON
TENDER REFERENCE NO. N.I.T No. EE/IiW-D/TC/ 503 Dated. 04.12.20 17
NAME OF PROCURING EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
NAME OF WORK CONSTRUCTION OF ROAD FORM VILLAGE LAHOTI UMED ALl SHAMBANI TO GHANTAN WARI UC DHANDHI MILE 0/0-0/5 (1 KM).
SR. NO.
NAME OF FIRM/ BIDDERS N.T.N REGISTRATION
WITH PE.0 SINDH BOARD OF REVENUE
RELEVANT EXPERIENCE
TURNOVER OF AT LEAST LAST THREE YEARS
FUNDS! BUDGET
05% EARNEST
MONEY
TENDER FEEl COST BIDDING
DOCUMENT
I M/S Z.A QURESH! Available Registered Registered Available Available Available Available Deposited
2 MIS MOLE DINO CI-IACHAR Available Registered Registered Available Available Available Available Deposited
CHAIRMAN MEMBER MEMBER
(RAFIQUE AHMED SHII EXECUTIVE flEER HIGHWA'1DIVISION
SUKKUR
(WAREED BUX QAMI} ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION ROHRI
(ABDUL RAFEEZ MEMON) ASSISTANT ENGINEER
PUBLIC HEALTH ENGG: SUB-DIVISION ROHRI
ATTENDANCE SHEET OF PARTICIPATION IN TENDER PROCESS IN EXECUTIVE ENGINEER HIGHWAYS DIVISION SIJKKUR
NAME OF WORK: - CONSTRUCTION OF ROAD FROM VILLAGE SIRAN WARO TO PHOTO MAHAR MILE 0/0-0/7.
EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR HELD ON 22.12.2017
SR. NO.
NAME OF CONTRACTOR SIGNATURE
I M/S AL-MUZAMIL SHAIKH CONSYI': Co
ALMUZAM(L SHMKH CONSTRUTION & GO:
GOVT: CONTRACTOR Prop: Asad Au
2 M/S AL-AMEER ENTERPRISES
CHAIRMAN
(RAFIQUE AJMED SHAIKH) EXECUTfJE ENGINEER HIGHWAYS DIVISION
SUKKUR MEMBER MEMBER
'V
(WAHEED BUX'QASMI) (ABDUL HAFEEZMEMON) ASSISTANT ENGINEER ASSISTANT EMGINEER
HIGHWAYS SUB-DIVISION PUBLIC HEALTH ENGG: SUB-DIVISION ROHRI ROHRI
S I-
S lD EVALUTION REPORT
1 Name of Procuring Agency Executive Engineer Highways Division Sukkur
2 Tender Reference No. N.I.T No. EE/HW-D/TC/ 503 Dated. 04. 12.2017
3 Tender Description! Name of Work! Item CONSTRUCTION OF ROAD FROM VILLAGE SIRAN WARO TO PHOTO MAHAR MILE 0/0-0/7.
4 Method of Procurement Single Stage (By Competitive Rate! Bid)
5 Tender Published Published in (i)Daily Awami Awaz Karachi Dated. 07.12.2017 (II) Daily Express Karachi Dated. 07.12.2017 (iii) Daily Dawn Karachi Datcd. 07.12.2017 (iv) Daily Sobh Karachi Dated. 07.12.2017
SPPRA ID NO:2147483647 S.No. 35535 Dated: 05-12-2017
6 Total Document Sold 02 Nos.
7 Total Bids Received 02 Nos.
8 Technical Bid Opening Date (If Aoolicablel
--
9 No of Bid Technically Qualified (If Applicable)
01 No.
10 Bids Rejected 01 Nos.
11 Financial Bid Opening Date 22.12.2017
BID EVALUATION REPORT
COST RANKING IN COMPARISON REASONS FOR SR # NAME OF FIRM OF BIDDER OFFERED BY TERMS OF WITH ESTIMATE ACCEPTANCE/ REMARKS
THE BIDDER COST COST (SAVING) REJECTION
1 M/S AL-MUZAMIL SHAIKH CONSTI': CO
12011592 i 257408 Accepted Being Lowest
2 M/S AL-AMEER ENTERPRISES
12102577 2nd Higher 166423 Rejected Being Higher
SIGNATURE OF THE TENDERING COMMITTEE.
CHAIRMAN
(RAFIQUE AHMED$HUKH) EXECUTIVE NINEER
HIGHWAYS DIVISION SUKKUR
MEMBER MEMBER
Jr (WAHEED BUX QASMI) ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION ROHRI
(ABDUL HAFEEZ MEMON) ASSISTANT ENGINEER
PUBLIC HEALTH ENGG: SUB-DIVISION ROHRI
DESCRIPTION ESTIMATE SR NO
AMOUNT RATE
(A) Total Cost as per Estimate (B) Total as per Tender
Saving (A+B) Percentage Saving
A.A Amount Lowest Tender Amount
Saving Over A.A
12269000 12011592
257408 2.10
12300000 12011592
288408
(ABOUL HAF'E ..
•IIPI I(. NI TN ((.
Mo N'
S
(WAHEEDUXI ' ASSISTANT ErUEER
JIIGHWAYS SUB-DIVISO4 I •I
EXECufe r- Iiw. S
-4
NAME OF WORK: -
FINANCIAL REVIEW / COMPARTWE STATEMJT
CONSTRUCTION OF ROAD FROM VILLAGE SIRAN WARO TO PHOTO MAHAR MILE 0/0-0/7. $
PART "A" (ROAD WORK
1 Amount of Schedule "B' 2456762 2456762 2456762
2 Add: 8% Above (1 196541 7.60% Above (+) 186714 8.63% Above (+) 212019
3 Ded: Diff Cost of Bitumen (-) 159824 159824 159824
PART "A" 2493479 2483652 2508957 PART "B" (ROAD WORK
1 Amount of Schedule "B" 7956733 7956733 7956733
2 Add: 8% Above (+) 636539 7.60% Above (+) 604712 8.30% Above (+) 660409
3 Ded: Duff Cost of Bitumen (-) 399222 399222 399222
PART "B" 8194050 8162223 8217920 PART "C" (10 RFT BRIDGE
1 Amount of Schedule "B" 993781 993781 993781 2 Permium --- 17.20% Above (+) 170930 18.13% Above (+) 180172 3 Add: Cartage of Material (+) 177541
PART "C" 1171322 1164711 1173953 PART "D" (3' SPAR CULVERTS
1 Amount of Schedule "B' 172242 172242 172242 2 Permium --- 16.70%Above(+) 28764 17.13%Above(+) 29505 3 Add: Cartage of Material (+) 29666
PART "D" 201908 201006 201747
GRAND TOTAL A+B+C+D: - 12060759 12011592 12102577
ADD: CONTIGENCY (LUM-SUM) 208270
The Lowest Rates Qouted By MIS AL-MUZAMIL CONSTT: Co Government Contractor are:-
PART "A" @ Rs. 7.60% Above (Rupees Seven Point Sixty Percent Above) PART "B" @ Rs. 7.60% Above (Rupees Seven Point Sixty Percent Above) PART "C" @ Rs. 17.20% Above (Rupees Seventeen Point Twenty Percent Above) 1'ART "D" Rs. 16.70% Above (Rupees Sixteen Point Seventy Percent Above) Lowest Rates are Recommended for Approval
Q7I-I A.Iwr
TENDER REFERENCE NO. N.I.T No. EE/HW-D/TC/ 503 Dated. 04.12.2017
NAME OF PROCURING EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
NAME OF WORK CONSTRUCTION OF ROAD FROM VILLAGE SIRAN WARO TO PHOTO MAHAR MILE 0/0-0/7.
S
4
SR. NO.
NAME OF FIRM/ BIDDERS N.T.N REGISTRATION
WITH P.E.0 SINDH BOARD OF REVENUE
RELEVANT EXPERIENCE
TURNOVER OF AT LEAST LAST
FUNDS/ BUDGET
05% EARNEST
TENDER FEEl COST BIDDING
THREE YEARS MONEY DOCUMENT
1 MIS AL-MUZAMIL SHAINII CONSTTs
CO
Available Registered Registered Available Available Available Available l)eposited
2 MIS AL-AMEER ENTERPRISES Available Registered Registered Available Available Available Available Deposited
CHAIRMAN MEMBER MEMBER
(RAFIQUE AHMJDSHAIKH) EXECUTIVEENGINEER HIGHWAYS DIVISION
SUKKUR
(WAHEED BUX QASMI) ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION ROIIRI
(ABDUL HAFEEZ MEMON) ASSISTANT ENGINEER
PUBLIC HEALTH ENGG: SUB-DIVISION ROHRI
ATTENDANCE SHEET OF PARTICIPATION IN TENDER PROCESS IN EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
NAME OF WORK: - CONSTRUCTION OF ROAD FROM KORAI WAH TO GHULAM MURTAZA SHAIKH MILE 0/0-0/6+330 TALUKA PANOAKIL.
EXECUTIVE ENGINEER HIGHWAYS DIVISION SURRUR HELD ON 22.12.2017
SR. NO.
NAME OF CONTRACTOR SIGNATURE
1 M/S MAJID GULZAR SHAJKH
2 M/S ASHIQUE ALT ABBASI
; \\
CHAIRMAN
(RAFIQUE AHMD-SHAIKH) EXECUTIVEENGINEER
HIGHWAYS DIVISION
SUKKUR
MEMBER MEMBER
(WAHEED BUX QASMI) ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION ROHRI
(ABDUL HAF E MON) ASSISTANT ENGINEER
PUBLIC HEALTH ENGG: SUB-DIVISION RO H RI
BID EVALUTION REPORT
1 Name of Procuring Agency Executive Engineer Highways Division Sukkur
2 Tender Reference No. N.I.T No. EE/l-IW-D/TC/ 503 Dated. 04.12.2017
3 Tender Description/ Name of Work/ Item CONSTRUCTION OF ROAD FROM KORA! WAH TO GHULAM MURTAZA SHAIKH MILE 0/0-0/6+330 TALUKA PANOAKIL.
4 Method of Procurement Single Stage (By Competitive Rate! B:cl)
5 Tender Published Published in (i)Daily Awami Awaz Karachi Dated. 07.12.20 17 (ii) Daily Express Karachi Dated. 07.12.2017 (iii) Daily Dawn Karachi Dated. 07.12.2017 (iv) Daily Sobh Karachi Dated. 07. 12.20 17
SPPRA ID NO:2 147483647 S.No. 35535 Dated: 05-12-2017
6 Total Document Sold 02 Nos.
7 Total Bids Received 02 Nos.
8 Technical Bid Opening Date (If Aoolicable)
- -
9 No of Bid Technically Qualified (If Applicable)
01 No.
10 Bids Rejected 01 Nos.
11 Financial Bid Opening Date 22.12.2017
BID EVALUATION REPORT
COST RANKING IN COMPARISON REASONS FOR SR # NAME OF FIRM OF BIDDER OFFERED BY TERMS OF WITH ESTIMATE ACCEPTANCE/ REMARKS
THE BIDDER COST COST (SAVING) REJECTION
1 M/S MAJID GULZAR SHAII<H
9951201 lu Ist 38799 Accepted Being Lowest
2 M/S ASHIQUE AL! ABBASI 10011698 2nd Higher -21698 Rejected Being Higher
SIGNATURE OF THE TENDERING COMMITTEE.
CHAIRMAN
(RAFIQUE AHMED $icIKH) EXECUTIVE NINEER
HIGHWAYVDIVISION SUKKUR
MEMBER MEMBER
(WAHEED BUX QASMI) ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION ROHRI
(ABDUL HAFEEZ MEMON) ASSISTANT ENINEER
PUBLIC HEALTH ENGt: SUB-DIVISION ROHRI
RATE AMOUNT RATE [1OUNT
CONSTRUCTION OF ROAD FROM TALUKA PANOAKIL.
MORAl WAR TO GHULAM MURTAZA SHAIKH MILE 0/0-0/6~330
ESTIMATE MIS MAJID GULZAR SHAXKU MIS ASHIQUE AL! ABSASI
NAME OF WORK: -
SR NO DESCRIPTION
PART "A" (ROAD WORK
(A) Total Cost as l)e1 Estimate (B) Total as per Tender
Saving (MB) Percentage Saving
A.A Amount Lowest Tender Amount
Saving Over A.A
9990000 9951201
38799 0.39
10000000 9951201
48799
(ABDtJL HAFE" E' ASSISTANT E'
- EER PUBLIC HEALTH E?Gu: SUB.Di VISION
ROHRI
Fl ANCIAL RIVIEW JCOMPARATIVJ STATEMNT
Amount of Schedule 'B' 9465702 9465702 9465702
2 Add: 8% Above (1 757256 7.60% Above (+) 719393 8.21% Above (+) 777134
3 Dccl: Diff Cost of Bitumen (-) 621438 621438 621438
PART "A" 9601520 9563657 9621398 PART "B" (MASONARY STRUCTURE
1 Amount of Schedule "B" 172242 172242 172242
2 Permium -- 12.50% Above (~) 21530 13.30% Above (+) 22908
3 Add: Cartage of Material (~) 22126
PART "B" 194368 193772 195150 388736 x 2 387544 x 2 390300
GRAND TOTAL A, B: -
9990256
9951201 10011698
ADD: CONTIGENCY (LUM-SUM)
The Lowest Rates Qouted By M/S MAJID GULZAR SHAIKE Government Contractor ire:-
PART "A" Rs. 76()% Above (Rupees Seven Point Sixty Percent Above) PART "B" Qi Rs. 12.50% Above (Rupees 'I\velve Point Fifty Percent Above)
Lowest Rates are Recommended for Approval
"S
rIWAHEED B1IY" " MI) I ASSISTAN) , ER }IIGHWAYS Su .,1tSION
ROHRI
EXECUTIVEE - 1EER HIGHWAY • IVISION
'•%S Ucwl—
TENDER REFERENCE NO. N.I.T No. EE/HW-D/TC/ 503 Dated. 04.12.2017
NAME OF PROCURING EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
NAME OF WORK CONSTRUCTION OF ROAD FROM KOR.AI WAN TO GHULAM MURTAZA SHAIKH MILE 0/0-0/6+330 TALUKA PANOAKIL.
TURNOVER OF TENDER FEEl SR.
NAME OF FIRM! BIDDERS N.T.N REGISTRATION SINDH BOARD RELEVANT
AT LEAST LAST FUNDS/
EARNEST COST BIDDING NO. WITH P.E.0 OF REVENUE EXPERIENCE
THREE YEARS BUDGET
MONEY DOCUMENT
I MIS MAJID GULZAR SHAIKII Available Registered Registered Avtilablr Available Available Available Deposited
2 M/S ASHIQUE ALl AI3BASl Available Registered Registered Availabli Available Available Available Deposited
CHAIRMAN MEMBER MEMBER
(RAFIQUE AHME8flAIKH) EXECUTIVEGINEER HIGHWAYS DIVISION
SUKKUR
(WAHEED BUX QA$MI) ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION ROHRI
(ABDUL HAFEEZMEMON) ASSISTANT ENGINEER
PUBLIC HEALTH ENOG: SUB-DIVISION ROHRI
ATTENDANCE SHEET OF PARTICIPATION IN TENDER PROCESS IN EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
NAME OF WORK: - IMPR: /RECDG: OF ROAD & CONST: OF ROAD ARRORE BACHAL SHAH ROAD TO OLD JANOJI VIA SHAH MIR MANGSI MILE 0/0-1/5 (2.60 KM)
EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR HELD ON 22.12.2017
SR. NO.
NAME OF CONT1ACTOR SIGNATURE
1 M/SBAHADURALISHAIKH
ALl SHAIKH GOV1':CONTRACTO
BAHADUR
2 MIS ASI-I1QUE ALl ABBASI
CHAIRMAN
(RAFIQUE AHMp-SflAIKH) EXECUTIVENGINEER HIGHWAYS DIVISION
SUKKUR
MEMBER MEMBER
\J 4
(WAHEED BUX QASMI) (ABDUL HAF MMON) ASSISTANT ENGINEER ASSISTANT EN '.1 R
HIGHWAYS SUB-DIVISION PUBLIC HEALTH EN : SUB-DIVISION ROHRI ROHRI
MEMBER
(ABDUL HA ASSISTANT EN
PUBLIC HEALTH EN ROH I
MON) INEER
VISION
I
BID E VALUTIQJ RE P0 RI
1 Name of Procuring Agency Executive Engineer Highways Division Sukkur
2 Tender Reference No. N.l.T No. EE/HW-D/TC/ 503 Dated. 04.12.2017
3 Tender Dcscription/ Name of Work! Item
IMPR: /RECDG: OF ROAD & CONST: OF ROAD ARRORE BACHAL SHAH ROAD TO OLD JANOJI VIA SHAH MIR MANGSI MILE 0/0-1/5 (2.60 KM)
4 Method of Procurement Single Stage (By Competitive Rate/ Bid)
5 Tender Published Published in (i)Daily Awami Awaz Karachi Dated. 07.12.2017 (ii) Daily Express Karachi Dated. 07.12.2017 (iii) Daily Dawn Karachi Dated. 07.12.20 17 (iv) Daily Sobh Karachi Dated. 07.12.2017
SPPRA ID NO:2 147483647 S.No. 35535 Dated: 05-12-2017
6 Total Document Sold 02 Nos.
7 Total Bids Received 02 Nos.
8 Technical Bid Opening Date (If Aoolicable)
--
9 No of Bid Technically Qualified (If Applicable)
01 No.
10 Bids Rejected 01 Nos.
11 Financial Bid Opening Date 22. 12.2017
BID EVALUATION REPORT
I COST RANKING IN COMPARISON REASONS FOR SR # NAME OF FIRM OF BIDDER I
OFFERED BYTHE
TERMS OF WITH ESTIMATE ACCEPTANCE! REMARKS
J BIDDER COST COST (SAVING) REJECTION
1 M/S BAHADUR ALl SHAIKH 15811216 1st Lowest 157784 Accepted Being Lowest
2 M/S ASHIQUE ALL ABBASI 15953502 2'' Higher 15498 Rejected Being Higher
SIGNATURE OF THE TENDERING COMMITTEE.
CHAIRMAN
(RAFIQUE AHME8HAIKH) EXECUTIVE..E11G!NEER
HIGHWAYS DIVISION SUKKUR
MEMBER
(WAHEED BUXIQASMI) ASSISTANT ENbINEER
HIGHWAYS SUB-DIVISION ROHRI
$
NAME OF WORK: - IMPR: /RECDG: OF ROAD & CONST: OF ROAD ARRORE BACHAL SHAH ROAD TO OLD JANOJI VIA SHAH M MANGSI MILE 0/0-1/5 (2.60 KM)
M/S BAHADUR AL! SHA1KE
RATE
M/S ASHIQUE AL! ABBASI
AMOUNT
SR [_No DESCRIPTION ESTIMATE
AMOUNT
RATE
XEC' 'V HIG. --
r
V1s; A8DUL HA1 ASSiSTANT
' ER PUBLIC NEtLTH EN : SUB.DIVIS(ON
WA.EO BLIXOASMI) ASSiSTANT ENGINEER
HIGHWAYS SUB-DIVISION ROHRI
FINANCIAL RIWIEW / COMPARATIVE STATEMNT
PART 'A (ROAD WORK 1 Amount of Schedule "B" 6474977 6474977 6474977 2 Add: 8% Above (+1 518000 7.25% Above (+) 469436 8.35% Above (+) 540661 3 Dccl: Diff Cost of Bitumen (-) 399222 399222 399222
TOTAL: A 6593755 6545191 6616416 PART "B" (ROAD WORK
I Amount of Schedule "B" 8442006 8442006 8442006 2 Add: 14% Above (} 1181880 13.50% Above (+) 1139671 l43O%Abovc 1207207 3 Ded: Duff Cost of Bitumen (-1 638846 638846 638846
TOTAL: B 8985040 8942831 9010367 PART "C' (3' SPAN CULVERTS
[i Amount of Non Schedule "B" 172242 172242 172242 2 Permium -- 15% Above (+) 25836 16.41 % Above (+) 28265 3 Add: Cartage of Material (+) 27554
TOTAL: C 199796 198078 200507 PART 'D" (PIPE CULVERTS
I Amount of Non Schedule "B" 26285 26285 26285 2 Permium -- 19% Above (~) 4994 20.04% Above ()_ 5268 3 AcId: Carta of Material (+) 5214
TOTAL: C 31499 31279 31553 X4 = 125996 x 4 125116 c 4 126212
GRAND TOTAL A+B+C:. 15904587 15811216 15953502
ADD: CONTIGENCY (LUM-SUM) 64749
The Lowest Rates Qoutcd By MIS BAHADUR AL! SHAIKH Government Cont i-actor are:-
PART "K Rs. 7.25% Above (Rupees Seven Point Twenty Five Percent Above) PART "[3' ': Rs. 13.50% Above (Rupees Thirteen Point Fifty Percent Above) PART "C' r Rs. 15% Above (Rupees Fifteen Percent Above) PART "1)" (ii; Rs. 19% Above (Rupees Nineteen Pci-cent Above) Lowest Rates are Recommend for Apval 4
(A) Total Cost as per Estimate (B) Total as per Tender
Saving (A"l) Percentage Saving
A.A Amount Lowest Tender Ainonin
Saving Over A.A
15969000 15811216
157784 0.99
16000000 15811216 188784
I
REGISTRATION DH BoARD WITH P.E.0 OF REVENUE NAI1E OF FIRM! BIDDERS RELEVANT
EXPERIENCE
TURNOVER OF AT LEAST LAST THREE YEARS
FUNDS/ BUDGET
05% EARNEST
MONEY
JD•
TENDER REFERENCE NO. N.I.T No. EE/HW-D/TC/ 503 Dated. 04.12.20 17
NAME OF PROCURING EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
NAME OF WORK IMPR: /RECDG: OF ROAD & CONST: OF ROAD ARRORE BACHAL SHAH ROAD TO OLD JANOJI VIA SHAH MIR MANGSI MILE 0/0-1/5 (2.60 KM)
SR. NO.
1 MIS I IAI-IAI)UR ALl SIlAIKIl Avail,it,li Registered Registered Available Available Available Available Deposited
2 M/S ASHIQUE ALl ABBASI Available Registered Registered Available Available Avaihible Available Deposited
CHAIRMAN MEMBER MEMBER
(FAFIQUE AHME.S1TAIKHJ (WAHEED BUX QASMI) (ABDUL HAI1Z M MON) EXECUTIVE,-f1GINEER ASSISTANT ENGINEER ASSISTANT EN HIGHWAYS DIVISION HIGHWAYS SUB-DIVISION PUBLIC HEALTH ENG . . -DIVISION
SUKKUR ROHRI ROH
TENDER FEE! COST BIDDING
DOCUMENT
• TTENDANCE SHEET OF PARTICIPATION IN TENDER PROCESS IN EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
NAME OF WORK: - CONSTRUCTION OF ROAD/PAVER BLOCK AND DRAINS AT VILLAGE DOLAT KHAN PATHAN MILE 0/0-0/3.
EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR HELD ON 22.12.2017
SR. NO.
NAME OF CONTRACTOR SIGNATURE
1 M/SDKCENTERPRISES
2 M/SSI-IAFQUATALIlTPAR&SONS
7, CHAIRMAN
(RAFIQUE A D SHAIKH)
EXECUT E ENGINEER HIGHWAYS DIVISION
SUKKUR
MEMBER MEMBER
(WAHEED BUX QASMI) (ABDUL HAF Z EMON) ASSISTANT ENGINEER ASSISTANT 1(GEE1T
HIGHWAYS SUB-DIVISION PUBLIC HEALTH ENGG: SUB-DIVISION ROHRI ROHRI
51D VALUTION R.PORT
I Name of Procuring Agency Executive Engineer Highways Division Sukkur
2 Tender Reference No. N.l.T No. EE/HW-D/TC/ 503 Dated. 04.12.20 17
3 Tender Description! Name of Work! Item
CONSTRUCTION OF ROAD/PAVER BLOCK AND DRAINS AT VILLAGE DOLAT KHAN PATHAN MILE 0/0-0/3.
4 Method of Procurement Single Stage (By Competitive Rate! Bid)
5 Tender Published Published in (i)Dafty Awami Awaz Karachi Dated. 07. 12.2017 (ii) Daily Express Karachi Dated. 07.12.2017 (iii) Daily Dawn Karachi Dated. 07.12.2017 (iv) Daily Sobh Karachi Dated. 07.12.2017
SPPRA ID NO:2 147483647 S.No. 35535 Dated: 05-12-2017
5 Total Document Sold 03 Nos.
7 Total Bids Received 03 Nos.
8 Technical Bid Opening Date (If Atnlicablc)
--
9 No of Bid Technically Qualified (If Applicable)
01 No.
10 Bids Rejected 02 Nos.
11 Financial Bid Opening Date 22.12.2017
BID EVALUATION REPORT
COST RANKING IN COMPARISON REASONS FOR SR # NAME OF FIRM OF BIDDER OFFERED
BY THE TERMS OF
COST WITH ESTIMATE COST (SAVING)
ACCEPTANCE! REJECTION rREMARKS
RIDDER - -
1 MIS DKC ENTERPRISES 10681805 1st Lowest 112195 Accepted Being Lowest
2 M/S SHAFQUAT ALl KATPAR & SONS
10756028 2' Higher 37972 Rejected Being Higher
SIGNATURE OF THE TENDERING COMMITTEE.
CHAIRMAN
(RAFIQUE AHrvIEJHAIKH) EXECUTIVGINEER
HIGHWAYS DIVISION SUKKUR
MEMBER MEMBER
(WAH' ASMI} (ABDUL HZ EMON) ASSISTANT ENGINEER ASSISTANT E I
HIGHWAYS SUB-DIVISION PUBLIC HEALTH EN : SUB-DIVISION ROHRI ROHRI
MIS DKC ENTERPRISES MIS SHAFQUAT AL! KATPAR & SONS
________RATE k AMOUNT RATE AMOUNT
SR
LNO DESCRIPTION
ESTIMATE
PART 'A" PAVER BLOCK) Amount of Schedule "13" l)ed: 20% Below (on ('aver Block
'I
Add: Cartage of Material TOTAL: A
4387627 4387627 4387627
(.) 743144 0,50% Above (+) 2)938 I (3% AbOVe (+) 49580
(+) 802581 4447064 4409565 4437207
(A) 'l'otal Cost as per Esthnatc (B) Total as per Tender
Saving (MB) lk'tcentage Saving
A.A Amount Lowest 'Fender Amount
Saving Over A.A
10794000 10681805
112195 1.04
10800000 10681805
118195
1'he Lowest Rates Qouted By S DKC ENTERPRISES Government Contractor arc:-
PART "A"'a, Rs. 0,50% Above (Rupees Zero Point Fifty Percent Above) PART "13" 'ii Rs, 14% Above (Rupees Fourteen Percent Above) PART "C" .i Rs. 3470000/- Non Schedule
l.,owest !';ii's arc Recommended for 1\7pr0va1
—
EED BUX Q R XECUTIVE (t 1MEE\ ASSISTANT ENGINEE 1IGHWAYS D1VISIOJ
I)IGHW/YS SUB-DIV° SUKKUR R01R1
(ABDUL HAF EZ EMON ASSISTANT
PUBLIC HEALTH E es,,: SU8DtVlSIO& ROHR(
ADD: CONTIGENCY (LUM-SUM) 50000
FINANCIAL REVIEWJ (XMPARATIVE STAAATEMNI
NAME OF WORK: - CONSTRUCTION OF ROAD/PAVER BLOCK AND DRAINS AT VILLAGE DOLAT KHAN PATHAN MILE 0/0-0/3.
PART "B" (DRAINS 1 Amount of Schedule "[3" 2458105 2458105 2458105 2 Permium (-) 14% Above (:') 344135 15% Above (+) 368716 3 Add: Cartage of Material 364878
TOTAL: B PART "C" (SOLAR LIGHT)
2822983 2802240 2826821
Amount of Non Schedule "B" 3474000 3470000 3492000 2 Perinium 3 Add: Cartage of Material
TOTAL: C 3474000 3470000 3492000
GRAND TOTAL A+B+C:. 10744047 10681805 10756028
TENDER REFERENCE NO. N.1.T No. EE/HW-D/TC/ 503 Dated. 04.12.2017
NAME OF PROCURING EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
NAME OF WORK CONSTRUCTION OF ROAD/PAVER BLOCK AND DRAINS AT VILLAGE DOLAT KHAN PATHAN MILE
0/0-0/3.
SR. NO.
NAME OF FIRM/ BIDDERS N.T.N icEGISTRATION
WITH P.E.0 SINDH BOARD OF REVENUE
RELEVANT EXPERIENCE
TURNOVER OF AT LEAST LAST THREE YEARS
FUNDS/ BUDGET
05% EARNEST
MONEY
TENDER FEE/ COST BIDDING
DOCUMENT
1 MIS DKC ENTERPRISES Available Registered Registered Available Available Available Available Deposited
2 M/S SHAFQUAT ALl KATPAR & SONS Available Registered Rcgsurrd Available Available Available Available Deposited
CHAIRMAN MEMBER MEMBER
(RAFIQUE MtVID SHAIKH) (WAHEED BUX QSMI) (ABDUL HAF M ON) EXECUTIVE ENGINEER ASSISTANT ENGINEER ASSISTANT ENG EER HIGHWAYS DIVISION HIGHWAYS SUB-DIVISION PUBLIC HEALTH ENG
SUKKUR ROHRI RO
MZE)IDANCE SHEET OF PARTICIPATION IN TENDER PROCESS IN EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
2tAME OF WORK: - CONSTRUCTION OF ROAD! PAVER BLOCK & DRAINAGE AT VILLAGE HUSSAIN KALWAR TALUKA PANOAKIL.
XECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR HELD ON 22.12.2017
SIGNATURE SR. N0
NAME OF CONTRACTOR
1 M/S ASHIQUE AL! ABBASI
Ashique All Abbasi Gout: ConivcIor &
General Order Supplier
2 M/S OHULAM MURTAZA GHUMRO
7 -•
< -
--
i
3 M/SRELIANTTRADELINK
j2j//
CHAIRMAN
Cr
(RAFIQUE AH SHAIKH) EXECUTIVE ENGINEER
HIGHWAYS DIVISION SUKKUR
MEMBER MEMBER
(WAHEED BUX QASMI) ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION ROHRI
(ABDUL HAFEEZ MEMON) ASSISTANT ENGINEER
PUBLIC HEALTH ENGG: SUB-DIVISION ROHRI
I BID EVALUTION REPORT 33
I Name of Procuring Agency Executive Engineer Highways Division Sukkur
2 Tender Reference No. N.I.T No. EE/HW-D/TC/ 503 Dated. 04. 12.2017
3 Tender DescriprionJ Name of Work/ Item CONSTRUCTION OF ROAD/ PAVER BLOCK & DRAINAGE AT VILLAGE HUSSAIN KALWAR TALUKA PANOAKIL.
4 Method of Procurement Single Stage (By Competitive Rate! Bid)
5 Tender Published Published in (i)The Express Tribune Karachi Dated. 19.10.2011 (ii) Daily Sobh Karachi Dated. 19.10.2017 (ill) Daily Jang Karachi Dated. 20. 10.2017 (iv) Daily Nau SiJh Dated. 19.10.2017
SPPRA ID NO:2 147483647 S.No. 35535 Dated: 05- 12-2017
6 Total Document Sold 03 Nos.
7 Total Bids Received 03 Nos.
8 Technical Bid Opening Date (If Applicable)
--
9 No of Bid Technically Qualified (If Applicable)
0] No.
10 Bids Rejected 02 Nos.
11 Financial Bid Opening Date 22.12.2017
BID EVALUATION REPORT
'F— COST RANKING IN COMPARISON REASONS FOR
SR A NAME OF FIRM OF BIDDER OFFERED BY TERMS OF WITH ESTIMATE ACCEPTANCE/ REMARKS THE BIDDER COST COST (SAVING) REJECTION
I M/S ASHIQUE ALl ABBASI 9572617 i Lowest 374383 Accepted Being' Lowest
2 MIS OHULAM MURTAZA GHUMRO
9662328 2' Higher 284672 Rejected Being Higher
3 M/S RELIANT TRADE LINK 9716926 3rd Highest 230074 Rejected Being Highest
SIGNATURE OF THE TENDERING COMMITTEE.
CHAIRMAN
(RAFIQUE AHME9-SHAIKH) EXECUT1VE-EGINEER
HIGHWAYS DIVISION SUKKUR
MEMBER MEMBER
(WAHEED BUX QASMI) ASSISTANT ENGINEER
HIGHWAYS SUB-DiVISION ROHRI
(ABDUL HAP Z 1MON) ASSISTANT ENGNEER
PUBLIC HEALTH ENGG: SUB-DIVISION ROHRI
SR NO
DESCRIPTION
MIS RELIANT TRAL'E ,.1!K 3 M/S GHULAM MURTAZA GHUMRO 1[s ASRIQUE ALt ABBASI ESTIMATE
AMOUNT AMOUNT AMOUNT RATE RATE RATE
The Lowest Rates Qouted By MIS ASHIOUE AL! ABBASI Government Contractor are:-
PART "A" Q Rs. 2.40% Above (Rupees Two Percent Above) PART "B" Rs. 11.80% Above (Rupees Eleven Point Eight Percent Above)
Lowest Rates are Recommended for Approval
(A) Total Cost as per Estimate (B) Total as per Tender
Saving (A+B) Percentage Saving
A.A Amount Lowest Tender Amount
Saving Over A.A
9947000 9572617
374383 3.76
10000000 9572617
427383
PART "B' 1078757 1076038 1082775 1087588
GRAND TOTAL A, B: - 9646526 9572617 9662328 9716926
ADD: CONTIGENCY (LUM-SUM) 300000
EER
(ABDUL HA?E ASSicTA!T F
F '•
T(WAHEED BUX ASM!) ASSISTANT LR
HIGHWAYS SUi3DtVtOt RO H RI
FINANCIAL BEEW / OMPARATIVE FATEMNT S K-048
NAME OF WORK: - CONST1UCT1ON 01 ROAD! PVER ELOC & DFAINAGE AT VILLAGE HTJSSAIN KALWAR TALTJIA PAT (AKjL.
PART "A" (PAVER BLOCK
1 Amount of Schedule "B' 8297440 8297440 8297440 8297440
2 Ded: 20% Below (on Paver Block Only) n Rs. 6892065/-
1378413 2.40°A. Above (+) 199139 3.40% Above (4) 282113 4% Above 1+) 331898
3 Add: Cartage of Material (-) 1648742
PART "A" 8567769 8496579 8579553 8629338 PART "B" (MASONARY STRUCTURE
1 Amount of Schedule "B" 962467 962467 962467 962467
2 Permjum -- 11.80% Above (+) 113571 12.50% Above (+) 120308 13% Above (+) 125)21
3 Add: Cartage of Material (1 116290
EXECUTIVE E1I6INEEF HIGH WP81JIVISION
SUKKUR
TENDER REFERENCE NO.
NAME OF PROCURING
NAME OF WORK
ø'r
N.I.T No. EE/HW-D/TC/ 503 Dated. 04.12.20 17
EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUF
CONSTRUCTION OF ROAD/ PAVER BLOCK & DRAINAGE AT VILLAGE HUSSAIN KALWAR TALUKA PANOAKIL.
r SR. NO.
NAME OF FIRM/BIDDERS N.T.N REGISTRATION
WITH F.E.0 SINDH BOARD OF REVENUE
RELEVANT i EXPERIENCE
TURNOVER OF AT LEAST LAST
1JNDS/ BUDGET
05% EARNEST
TENDER FEEl COST BIDDING
________ - j THREE YEARS MONEY DOCUMENT
I M/S ASHIQUE AU ABBASI Available Registered Registered Available Available Available Available Deposited
2 MIS GHULAM MURTAZA GHUMRO Available Registered Registered Available Available Available Available Deposited
3 MIS RELIANT TRADE LINK Available Registered Registered Available Available Available Available Deposited
CHAIRMAN MEMBER MEMBER
(RAFIQUE AHMBSHAIKH) EXECUTWEENGINEER HIGHWAYS DIVISION
SUKKUR
(WAHEED BUX QASMI) ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION ROHRI
(ABDUL RAPE Z MMON) ASSISTANT EN91NEER
PUBLIC HEALTH ENGG:-SIJB-DWISION RORRI
/'?TENDANCE SHEET OF PARTICIPATION IN TENDER PROCESS IN EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
NAME OF WORK: - CONSTRUCTION OF ROAD LINK ROAD FROM SALEHPAT SIKANDERABAD ROAD AT DARGAH KHUDA BUX SHAH TO VILLAGE KARAMAT MUHALLA UC LAL JURIO MILE 0/0-0/4 (0.80 KM).
EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR HELD ON 22. 12.2017
SR. NO.
NAME OF CONTRACTOR SIGNATURE
I M/S BADARUDIN & CO.
-'P.1
2
-
M/SAKS&BUILDERS
'Ss gth6R M
CHAIRMAN
(RAFIQUE AHJ\IED SHAIKH) EXECUTIVE ENGINEER
HIGHWAYS DIVISION SUKKUR
MEMBER MEMBER
(WAHEED BUX QASMI) ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION ROHRI
(ABDUL HAFEEZ MEMON) ASSISTANT ENGINEER
PUBLIC HEALTH ENGG: SUB-DIVISION ROHRI
BID UTlik R 1
'1 Name of Procuring Agency Executive Engineer Highways Division Sukkur
2 Tender Reference No. N.I.T No. EE/HW-D/TC/ 503 Dated. 04. 12.2017
3 Tender Description/ Name of Work/ Item CONSTRUCTION OF ROAD LINK ROAD FROM SALEHPAT SIKANDERABAD ROAD AT DARGAH KHUDA BUX SHAH TO VILLAGE KARAMAT MUHALLA UC LAL JURIO MILE 0/0-0/4 (0.80 KM).
4 Method of Procurement Single Stage (By Competitive Rate! Bid)
5 Tender Published Published in (i)The Express Tribune Karachi Dated. 19.10.2011
(uI Daily Sobh Karachi Dated. 19.10.2017 (iii) Daily Jang Karachi Dated. 20.10.2017 (iv) Daily Nau Sijh Dated. 19. 10.20 17
SPPRA ID NO:2 147483647 S.No. 35535 Dated: 05-12-2017
6 Total Document Sold 02 Nos.
7 Total Bids Received 02 Nos.
8 Technical Bid Opening Date (If Applicable)
--
9 No of Bid Technically Qualified (If Applicable)
01 No.
10 Bids Rejected 01 Nos.
11 Financial Bid Opening Date 22.12.20 17
BID EVALUATION REPORT
COST RANKING IN COMPARISON REASONS FOR SR # NAME OF FIRM OF BIDDER OFFERED BY TERMS OF WITH ESTIMATE ACCEPTANCE! REMARKS
THE BIDDER COST COST (SAVING) REJECTION
I M/S BADARUDIN & CO. 5144458 1st Lowest 51542 Accepted Being Lowest
2 M/S AKS & BUILDERS 5206194 2nd Higher -10194 Rejected Being Higher
SIGNATURE OF THE TENDERING COMMITTEE.
CHAIRMAN
(RAFIQUE AHMEYHAIKH) EXECUTIVE ENGINEER HIGHWAYS DIVISION
SUKKUR
MEMBER MEMBER
(WAHEED BUX QASMI) ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION ROHRI
(ABDUL HAFEEZ MEMON) ASSISTANT ENGINEER
PUBLIC HEALTH ENGG: SUB-DIVISION ROHRI
(A) Total Cost as per Estimate (B) Total as per Tender
Saving (A+B) Percentage Saving
A.A Amount Lowest Tender Amount
Saving Over A.A
5196000 5144458
51542 0.99
5200000 5144458
55542
PART "C" 31960 31542 32102
GRAND TOTAL A+B+C: - 5196403 5144458 5206194
ADD: CONTIGENCY (LUM-SUM) 0
The Lowest Rates Qouted By MIS BADARUDIN & CO Government Contractor are:-
PART 'A" Rs. 7% Above (Rupees Seven Percent Above) PART "B" Rs. 16% Above (Rupees Sixteen Percent Above) PART "B" Rs. 20% Above (Rupees Twenty Percent Above)
Lowest Rates are Recommended for Approval
ABCUL iM-' . EMON) ASSiS1.A'ii ::NGit"lEER
PUBY EGG: S'Ja.DIVISION "—
[(WAHEED ;j QMi) ASS1P,4T ENCU'4ER
HlGHW.'S SUB.DlV3lON l OH Ri
I1FINANCIAL REVIEW L COMPARATIVE STATEMNT
NAME OF WORK: - CONSTRUCTION OF ROAD LINK ROAD FROM SALEHPAT SIKANDERABAD ROAD AT DARGAH KHUDA BUX SHAH TO VILLAGE KARAMAT MUHALLA UC LAL JTJRIO MILE 0/0-0/4(0.80 KM).
SR NO
DESCRIPTION ESTIMATE M/S BADARUDIN & Co. MIS AKS & BUILDERS
RATE AMOUNT RATE AMOUNT
PART "A" (ROAD WORK
1 Amount of Schedule "B" 4890222 4890222 4890222
2 Add: 8% Above (+) 391218 7% Above (+) 342316 8.17% AbOve (+) 399531
3 Ded: Diff Cost of Bitumen H 319423 319423 319423
PART "A' 4962017 4913115 4970330 PART "B" (3' SPAN CULVERTS
1 Amount of Schedule "B" 172242 172242 172242
2 Permium -- 16% Above (+) 27559 18.30% Above (+) 31520
3 Add: Cartage of Material (+) 30184
PART "B" 202426 199801 203762 PART "C" (PIPE CULVERTS
1 Amount of Schedule "B" 26285 26285 26285 2 Permium -- 20% Above (+) 5257 22.13% Above (+) 5817
- 3 Add: Cartage of Material (+) 5675
_II(_-
EXECU HLGW4" . ;,jiJtLOt41
I
I
IJIR è Q'LTALX wIc'rIøN
TENDER REFERENCE NO. N.I.T No. EE/HW-D/TC/ 503 Dated. 04.12.20 17
NAME OF PROCURING EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
NAME OF WORK CONSTRUCTION OF ROAD LINK ROAD FROM SALEHPAT SIKANDERABAD ROAD AT DARGAH KHUDA BUX SHAH TO VILLAGE KARAMAT MUHALLA UC LAL JURIO MILE 0/0-0/4(0.80 KM).
SR. NO.
NAME OF FIRM/ BIDDERS N.T.N REGISTRATION
WITH P.E.0 SINDH BOARD OF REVENU]
RELEVANT 1 EXPERIENCE
TURNOVER OF AT LEAST LAST
FUNDS/ BUDGET
05% EARNEST
TENDER FEiT COST BIDDING
THREE MONEY DOCUMENT
1 M/S BADARLJDIN & CO. Available Registered Registered Available Available .vailable Available Deposited
2 MIS AKS & BUILDERS Available Registered Registered Available Available Available Available Deposited
CHAIRMAN MEMBER MEMBER
(RAFIQUE AH?1flDSHAIKH) EXECUTIVENGINEER HIGHWAYS DIVISION
SUKKUR
(WAHEED BU?C QASMI) ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION ROHRI
(ABDUL HAFZ MEMON) ASSISTANT ENçUNEER
PUBLIC HEALTH ENG SUB-DIVISION ROHRI
ATNDANCE SHEET OF PARTICIPATION IN TENDER PROCESS IN EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
NAME OF WORK: - RECONDITIONING OF ROAD FROM NATIONAL HIGHWAY TO HUSSAIN KALWAR VIA DAYA GEER POLICE PICKET MILE 0/0-2/2.
EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR HELD ON 22. 12.2017
SR. NO.
NAME OF CONTRACTOR SIGNATURE
I i K AL-MUZAMIL SHAIKH CONS'fl': & Co.
(Ak AL-MUZAMIL SHAIKH
CONSTRUTION & CO: GOVT: CONTRACTOR
Prop: Asad All
2 M I/S SHAHZAMAN BROHI CONSfl: COMPANY
4
I,
3 MI/S R.A CONSTRUCTION COMPANY
CHAIRMAN
(RAFIQUE AfiMED SHAIKH) EXECUTIVE ENGINEER
HIGHWAYS DIVISION SUKKUR
MEMBER MEMBER
(WAHEED BOX QASMI) ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION ROHRI
(ABDUL HAFEEZ MEMON) ASSISTANT ENGINEER
PUBLIC HEALTH ENGG: SUB-DIVISION ROHRI
I ID VA LULLO.NREPORT
Name of Procuring Agency Executive Engineer Highways Division Sukkur
2 Tender Reference No. N.I.T No. EE/HW-D/TC/ 503 Dated. 04.12.2017
3 Tender Description! Name of Work! Item RECONDITIONING OF ROAD FROM NATIONAL HIGHWAY TO HUSSAIN KALWAR VIA DAYA GEER POLICE PICKET MILE 0/0-2/2.
Single Stage (By Competitive Rate! Bid) 4 Method of Procurement
5 Tender Published Published in (i)The Express Tribune Karachi Dated. 19.1O.2O1
(ii) Daily Sobh Karachi Dated. 19.10.2017 (iii) Daily Jang Karachi Dated. 20.10.2017 (iv) Daily Nau Sijh Dated. 19. 10 .20 17
SPPRA ID NO:2 147483647 S.No. 35535 Dated: 05-12-2017
Total Document Sold 03 Nos. 6
7 03 Nos. Total Bids Received
S Technical B1 Opening Date (If Applicable)
9 No of Bid Technically Qualified (If Applicable)
10 Bids Rejected
11 Financial Bid Opening Date
01 No.
02 Nos.
22.12.2017
BID EVALUATION REPORT
COST RANKING IN COMPARISON REASONS FOR SR # NAME OF FIRM OF BIDDER OFFERED BY TERMS OF WITH ESTIMATE ACCEPTANCE! REMARKS
THE BIDDER COST COST (SAVING) REJECTION
1 M/S AL-MUZAMIL SHAIKH CONSTI': & CO.
9859647 1st Lowest 138353 Accepted Being Lowest
2 M/S SHAHZAMAN BROHI CONSTI': COMPANY
9947921 2nd Higher 50079 Rejected Being Higher
3 M/S R.A CONSTRUCTION COMPANY
10046002 3rd Highest -48002 Rejected Being Highest
SIGNATURE OF THE TENDERING COMMITTEE.
CHAIRMAN
(RAFIQUE AHMEDSHAIKH) EXECUTIVE ENGINEER
HIGHWAYS DIVISION SUKKUR
MEM BER MEMBER
(WAHEED BUX QASMI) ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION ROHRI
(ABDUL HAFEEZ MEMON) ASSISTANT ENGINEER
PUBLIC HEALTH ENGG: SUB-DIVISION ROHRI
(A) Total Cost as per Estimate (B) Total as per Tender
Saving (A+B) Percentage Saving
A.A Amount Lowest Tender Amount
Saving Over A.A
9998000 9859647
138353 1.38
10000000 9859647
140353
GRAND TOTAL A, B: - 9947921 9859647 9947921 10046002
ADD: CONTIGENCY (LUM-SUM) 50000
The Lowest Rates Qouted By MIS AL-MUZA11IL SHAIKH CONSTT: & CO. Government Contractor are:-
PART "A' Rs. 13.10% Above (Rupees Thirteen Point Ten Percent Above)
Lowest Rates are Recommended for Approval
IABCWL riJL:
A8515TAN 1 ::.iNEER PUBUC E.Li E8G:
RCHRi
AhEED ASS STA NT
110
_ ri (;NEER
V 510 i
FINANCIAL REVIEW I COMPARATIVE STATEMNT
NAME OF WORK: - RECONDITIONING OF ROAD FROM NATIONAL HIGHWAY TO HUSSAIN KALWAR VIA DAYA GEER POLICE PICKET MILE 0/0-2/2.
SRDESCRIPTION ESTIMATE
NO
M/S AL-MUZAMIL SHAIKH CONSTT: & CO.
M/S SHAUZAMAN COMPANY
BROHI CONSTT: M/S R.A CONSTRUCTION COMP
RATE AMOUNT - RATE AMOUNT RATE AMOUNT
PART "A" (PAVER BLOCK) 1 AmountofSchedule"B' 9808161 9808161 9808161 9808161
2 Add: 14% Above (+) 1373143 13.10% Above (+) 1284869 14% Above (+) 1373143 15% Above (+) 1471224
3 Ded: Diff Cost of Bitumen (-) 1233383 1233383 1233383 1233383
EXCUTVE jER HC-HWAY)'SiON
'4 TENDER REFERENCE NO.
NAME OF PROCURING
NAME OF WORK
QJ I'XCAJrIQ
N.I.T No. EE/HW-D/TC/ 503 Dated. 04.12.2017
EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
RECONDITIONING OF ROAD FROM NATIONAL HIGHWAY TO HUSSAIN KALWAR VIA DAYA GEER POLICE PICKET MILE 0/0-2/2.
SR. NAME OF FIRM/ BIDDERS N.T.N
REGISTRATION SINDH BOARD ItELEVANT TURNOVER OF AT LEAST LAST
FUNDS/ 05%
EARNEST TENDER FEEl COST BIDDING
NO. WITH P.E.0 OF REVENUE EXPERIENCE THREE YEARS
BUDGET MONEY DOCUMENT
1 M/S AL-MUZAMIL SHAIKH CONSTT: & Co.
Available Registered Registered Available Available Available Available Deposited
2 M/S SHAHZAMAN BROHI CONSTT: COMPANY
Available Registered Registered Available Available Available Available Deposited
3 MIS R.A CONSTRUCTION COMPANY Available Registered Registered Available Available Available Available Deposited
CHAIRMAN MEMBER MEMBER
(ABDUL HAFEEZ MEMON) ASSISTANT ENGINEER
PUBLIC HEALTH ENGG: SUB-DIVISION ROHRI
(RAFIQUE AH)ErfSHAIKH) EXECUTIVE ENGINEER HIGHWAYS DIVISION
SUKKUR
(WAHEED BUX QASMI) ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION ROHRI
• TTENDANCE SHEET OF PARTICIPATION IN TENDER PROCESS IN EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
NAME OF WORK: - IMPROVEMENT! RECONDITIONING OF ROAD FROM SUKKUR SHIKARPUR TOAD TO KANDO WAHAN VIA FARASH MILE 0/0-1/5.
EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR HELD ON 22.12.2017
SR. NO.
NAME OF CONTRACTOR SIGNATURE
1 M/S LAL KHAN BUGHTI & BROTHERS
tO\nI CONTRAUi.)1(
2 M/SBASHIRAHMEDMAHAR
ASHIRA DMAHAR GOVERNMENT CONTRACTOR.
CHAIRMAN
(RAFIQUE AHMp-SHAIKH) EXECUTIV-ENGINEER
HIGHWAYS DIVISION SUKKUR
MEMBER MEMBER
(WAHEED BU QASMI) ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION ROHRI
(ABDUL HAFEEZ MEMQN)-ASSISTANT NG1NEER
PUBLIC HEALTH ENGG: SUB-DIVISION ROHRI
BLVALUTION REPORT
Name of Procuring Agency Executive Engineer Highways Division Sukkur
2 Tender Reference No. N.I.T No. EE/HW-D/TC/ 503 Dated. 04.12.2017
3 Tender Description/ Name of Work/ Item IMPROVEMENT/ RECONDITIONING OF ROAD FROM SUKKUR SHIKARPUR TOAD TO KANDO WAHAN VIA FARASH MILE 0/0-1/5.
4 Method of Procurement Single Stage (By Competitive Rate! Bid)
5 Tender Published Published in (l)Daily Awami Awaz Karachi Dated. 07.12.2017
(ii) Daily Express Karachi Dated. 07.12.2017 (lii) Daily Dawn Karachi Dated. 07.12.2017 (iv) Daily Sobh Karachi Dated. 07. 12.2017
SPPRA ID NO:2 147483647 S.No. 35535 Dated: 05-12-20 17
6 Total Document Sold 03 Nos.
7 Total Bids Received 03 Nos.
8 Technical Bid Opening Date (II Anolicable)
--
9 No of Bid Technically Qualified (If Applicable)
01 No.
10 Bids Rejected 02 Nos.
11 Financial Bid Opening Date 22.12.2017
BID EVALUATION REPORT
COST RANKING IN COMPARISON REASONS FOR SR # NAME OF FIRM OF BIDDER OFFERED BY TERMS OF WITH ESTIMATE ACCEPTANCE/ REMARKS
THE BIDDER COST I COST (SAVING) REJECTION
1 M/S LALI<HAN BIJGHTI & BROTHERS
8866177 i Lowest 131823 Accepted Being Lowest
2 M/S BASHIR AHMED MAHAR
8929520 2' Higher 68480 Rejected Being Higher
SIGNATURE OF THE TENDERING COMMITTEE.
CHAIRMAN
(RAFIQUE AHMEDM1UKH) EXECUTIVE ENINEER
HIGHWAYS DIVISION SUKKUR
MEMBER MEMBER
(ABDUL HAFEI MEMON) ASSISTANT ENGINEER
PUBLIC HEALTH ENGG: SUB-DIVISION ROHRI
(WAHEED UX QMI) ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION RO H RI
PART "B" 191563 191189 193
GRAND TOTAL A, B: - 8929520 8866177 8927655
ADD: CONTIGENCY (LUM-SUM) 70000
(ABDUL HAF ASSISTANT EER
PUBLIC HEALTH ENGG: SUB.DIVISION ROI-IRI
(WAHEEDB ÔASM)) ASSISTANT ENGINEER
HIGH WAY 0 IV ISbN
EXECUTIVE .NTNEER HIGHW DIViSION
lowest Rates are Recommended for Approval
The Lowest Rates Qouted By MIS LAL KHAN BIJOHTI & BROTHERS Government Contractor are:-
PART 'A" cIj Rs. 13.30% Above (Rupees Thirteen Point Thirty Percent Above) PART "B" @ Rs. 11% Above (Rupees Eleven Percent Above)
(A) Total Cost as per Estimate (B) Total as per Tender
Saving (A+B) Percentage Saving
A.A Amount Lowest Tender Amount
Saving Over A.A
8998000 8866177
131823 1.47
9000000 8866177
133823
FINANCIAL REVIEWJ COMPARATIVE STATEMN.L
NAME OF WORK: - IMPROVEMENT! RECONDITIONING OF ROAD FROM SUKKUR SHIKARPUR TOAD TO KANDO WAHAN
VIA FARASH MILE 0/0-1/5.
SR NO
DESCRH>TION ESTIMATE
MIS EAt, KEAN BUGHTI & BROTHERS _fM/S BASI-IIR AHMED MALIAR
_____ I RATE AMOUNT RATE AMOUNT
I Amount of Schedule "B" 8729092 8729092 8729092
2 Add: 14% Above () 1222073 13.30% Above (+) 1160969 14% Above (+) 1222073
3 Ded: DiffCost Bitumen (-) 1215073 1215073 1215073
PART A" 8736092 867498
1 Amount of Schedule "B" 172242 172242 172242
2 Pennium -- 11% Above (+) 18947 12.30% Above (+) 21186
3 Add: Cartage of Material (+) 19321
TENDER REFERENCE NO.
NAME OF PROCURING
NAME OF WORK
LJAIX AIIM
N.I.T No. EE/HW-D/TC/ 503 Dated. 04. 12.2017
EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
IMPROVEMENT! RECONDITIONING OF ROAD FROM SUKKUR SHIKARPUR TOAD TO KANDO
WAHAN VIA FARASH MILE 0/0.1/5.
SR. NO.
NAME OF FIRMI BIDDERS N.T.N REGISTRATION
WITH P.E.0 SINDH BOARD OF REVENUE
I LEV/T EXPERIENCE
TURNOVER OF AT LEAST LAST THREE YEARS
FUNDS/ BUDGET
O5 EARNEST
MONEY
TENDER FEE/ COST BIDDING
DOCUMENT
I M/S LAI., KHAN BUGHTI & BROTHERS Available Registered Registered Available Availabli Av,ni lie Available Deposited
2 M/S BASI-IIR AHMED MM tM Available Registered Registered Available Available Available Available Deposited
CHAIRMAN MEMBER MEMBER
(WAHEC Q) ASSISTANT ENGINEER
HIGHWAYS SUB-bIVISION ROHRI
(RAFIQUE AHMED EXECUTIVE E4EER HIGHWAYIVISION
SUKKUR
(ABDUL HAFE MEMON) ASSISTANT ENGINEER
PUBLIC HEALTH ENGGSUB-DIVISION ROHRI
ATTENDANCE SHEET OF PARTICIPATION IN TENDER PROCESS IN EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
NAME OF WORK: - CONSTRUCTION OF ROAD FROM VILLAGE ALLAH DAD SHAR TO VILLAGE MUHAMMAD SACHAL PHULPOTO MILE 0/0-0/5 (1 KM).
EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR HELD ON 22.12.2017
SR. NO.
NAME OF CONTRACTOR SIGNATURE
1 M/S MOLE DINO CHACHAR
M/S MOLI GOVT:
CHACHAR CONTRACTOR
2 M/SJANMUHAMMAD&BROTHERS
:, Go
OOIE int,acto!
CHAIRMAN
(RAFIQUE AHM9-5HAIKH) EXECUTWE ENGINEER
HIGHWAYS DWISION SIJKKUR
MEMBER MEMBER
(WAHEED BUX QASMI) ASSISTANT ENGINEER
HIGHWAYS SUB-DWISION ROHRI
(ABDUL HAFEEZ MEMON) ASSISTANT ENGINEER
PUBLIC HEALTH ENGGSUB-DWISION ROHRI
LL\ LUJLQ1i Ji- P 0 - I
1 Name of Procuring Agency Executive Engineer I-lighways Division Sukkur
2 Tender Reference No. NIT No. EE/HW-D/TC/ 503 Dated. 04.12.2017
3 Tender Description/ Name of Work/ (tern CONSTRUCTION OF ROAD FROM VILLAGE ALLAH DAD SHAR TO VILLAGE MUHAMMAD SACHAL PHULPOTO MILE 0/0-0/5 (1 KM).
4 Method of Procurement Single Stage (By Competitive Rate! Bid)
5 Tender Published Published in (i)Daily Awami Awaz Karachi Dated. 07.12.20 17
(ii) Daily Express Karachi Dated. 07.12.20 17 (iii) Daily Dawn Karachi Dated. 07.12.2017 (iv) Daily Sobh Karachi Dated. 07. 12.20 17
SPPRA ID NO:2 147483647 S.No. 35535 Dated: 05-12-2017
6 Total Document Sold 03 Nos.
7 Total Bids Received 03 Nos.
8 Technical Bid Opening Date (If Applicablel
--
9 No of Bid Technically Qualified (If Applicable)
01 No.
10 Bids Rejected 02 Nos.
11 Financial Bid Opening Date 22.12.2017
BID EVALUATION REPORT
COST RANKING IN COMPARISON REASONS FOR SR NAME OF FIRM OF BIDDER OFFERED BY TERMS OF WITH ESTIMATE ACCEPTANCE/ REMARKS
THE BIDDER COST COST (SAVING) REJECTION
1 M/S MOLE DINO CHACHAR 6385549 1st Lowest 111451 Accepted Being Lowest
2 M/S JAN MUHAMMAD & BROTHERS
6445562 2 Higher 51438 Rejected Being Higher
SIGNATURE OF THE TENDERING COMMITTEE.
CHAIRMAN
(RAFIQUE AHMED SJJAIKH) EXECUTWENG1EER
HIGHWAYS DIVISION SUKKUR
MEMBER
\
(WAHEED BUX QASMI) ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION ROHRI
MEMBER
(ABDUL HAF ZMEMON) ASSISTANT ENQ1NEER
PUBLIC HEALTH ENGG: SUB-DIVISION ROHRI
The Lowest Rates Qouted By MIS MOLE DINO CHACHAR Government Contractor are:-
PART "A @ Rs. 7.20% Above (Rupees Seven Point Twenty Percent Above) PART "B" Rs. 14% Above (Rupees Fourteen Percent Above) PART "C" Q Rs, 18% Above (Rupees Eighteen Percent Above)
Lowest Rates are Recommended for Approval
(A) Total Cost as per Estimate (B) Total as per Tender
Saving (A-fBI Percentage Saving
A.A Amount Lowest Tender Amount
Saving Over A,A
6497000 6385549
111451 1.72
6500000 6385549
114451
PART "C" 31191 31016 31453
GRAND TOTAL A+B+C: - 6436197 6385549 6445562
ADD: CONTIGENCY (LUM-SUM) 61170
(ABDULHAF ASSISTANT Et?ER
L.UC HEALTh ENGG: SUB.DIVj ROHRI
(WAHEED BUX QASMI)1 ASSLSTANT ENGINEER
HIGHWAYS SUB-DIVISION ROHR)
r FINANCIAL REVIEW / COMPAIATWE STATEMNT
NAME OF WORK: - CONSTRUCTION OF ROAD FROM VILLAGE ALLAH DAD SHAR TO VILLAGE MUHAMMAD SACHAL PHULPOTO MILE 0/0-0/5 (1 KM).
SR NO
DESCRIPTION ESTIMATE
MIS MOLE DINO CHACHAR MIS JAN MUHAMMAD & BROTHERS
_____ RATE AMOUNT RATE AMOUNT
PART "A" (ROAD WORK
1 Amount of Schedule "B" 6116977 6116977 6116977
2 Add: 8% Above (+) 489358 7.20% Above (+) 440422 8.17% Above (+) 499757
3 Ded: Duff Cost of Bitumen (-) 399222 399222 399222
PART "A" 6207113 6158177 6217512 PART "B" 1 3' SPAN CULVERTS
1 Amount of Schedulc"B" 172242 172242 172242
2 Fermium -- 14% Above (+) 24114 14,14% Above (') 24355
3 Add: Cai-tage of Material (-) 25651
PART "B" 197893 196356 196597 PART "C" (PIPE CULVERTS
1 Amount of Schedule "B" 26285 26285 26285 2 Permium -- 18% Above (+) 4731 19.66% Above (+) 5168 3 Add: Cartage of Material (4) 4906
EXECUTIVEEMgTNE HIGH WAYS DIVISIOMI
S U K KU R
TENDER REFERENCE NO.
NAME OF PROCURING
NAME OF WORK
xx xo 'r
N.LT No. EE/HW-D/TC/ 503 Dated. 04.12.20 17
EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
CONSTRUCTION OF ROAD FROM VILLAGE ALLAH DAD SHAR TO VILLAGE MUHAMMAD SACHAL PHULPOTO MILE 0/0-0/5 (1 KM).
SR. NO.
NAME OF FIRM/ BIDDERS N.T.N REGISTRATION
WITH P.E.0 SINDH BOARD OF REVENUE
RETANT EXPERIENCE
TURNOVER OF AT LEAST LAST
FUNDS/ BUDGET
05% EARNEST
TENDER FEE! COST BIDDING
THREE YEARS MONEY DOCUMENT
1 MIS MOLE DINO CHACHAR Available Registered Registered A abIe Available Available Available Deposited
2 M/S JAN MUHAMMAD & BROTHERS Available Registered Registered .\vaiIihk Available Available Available Deposited
CHAIRMAN MEMBER MEMBER
(RAFIQUE AHMEKAIKH) (WAHEED BUX QSMI) (ABDUL HAFL'MEMON) EXECUTIVE ENGINEER ASSISTANT ENGINEER ASSISTANT ENGINEER HIGHWAYS DIVISION HIGHWAYS SUB-DIVISION PUBLIC HEALTH ENGG: SUB.DIVISION
SUKKIJR ROHRI ROI—
• TTENDANCE SHEET OF PARTICIPATION IN TENDER PROCESS IN EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
NAME OF WORK: - CONSTRUCTION OF ROAD FROM KHUDA BUX MAHTAM ROAD TO GUL KHAN CHANDIO MILE 0/0-0/5.
EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR HELD ON 22.12.2017
SR. NO.
NAME OF CONTRACTOR SIGNATURE
1 MIS MAHTAM ENTERPRISES /
:,i "TERPRSE'
GOVI: Cu . ro
2 MIS SAAD KHOKHAR ENTERPRISES p.
Saad Khokh!iprises
CHAIRMAN
(RAFIQUE AHME9-SHAIKH) EXECUTIVE ENGINEER
HIGHWAYS DIVISION SUKKUR
MEMBER MEMBER
(WAHEED BUX QASMI) (ABDUL HAFEEZ MEMON) ASSISTANT ENGINEER ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION PUBLIC HEALTH ENGG: SUB-DIVISION ROHRI ROHRI
ID EVALUTJ.PN REPORT
1 Name of Procuring Agency Executive Engineer Highways Division Sukkur
2 Tender Reference No. N.I.T No. EE/HW-D/TC/ 503 Dated. 04.12.2017
3 Tender Description! Name of Work/ Item CONSTRUCTION OF ROAD FROM KHUDA BUX MAHTAM ROAD TO GUL KHAH CHANDIO MILE 0/0. 0/5.
4 Method of Procurement Single Stage (By Competitive Rate/ Bid)
5 Tender Published Published in (i)Daily Awami Awaz Karachi Dated. 07.12.20 17 (ii) Daily Express Karachi Dated. 07.12.2017 (iii) Daily Dawn Karachi Dated. 07.12.20 17 (iv) Daily Sobh Karachi Dated. 07. 12.20 17
SPPRA ID NO:2 147483647 S.No. 35535 Dated: 05-12-2017
6 Total Document Sold 02 Nos,
7 Total Bids Received 02 Nos.
8 Technical Bid Opening Date (If Aonlicable)
- -
9 No of Bid Technically Qualified (If Applicable)
01 No.
10 Bids Rejected 01 Nos.
11 Financial Bid Opening Date 22.12.2017
BID EVALUATION REPORT
COST RANKING IN COMPARISON REASONS FOR SR # NAME OF FIRM OF BIDDER OFFERED BY TERMS OF WITH ESTIMATE ACCEPTANCE/ REMARKS
THE BIDDER COST COST (SAVING) REJECTION
I M/S MAH'rAM ENTERPRISES
6952248 1 Lowest 157752 Accepted Being Lowest
2 M/S SAAD KHOKHAR ENTERPRISES
7022239 2 Higher 87761 Rejected Being Higher
SIGNATURE OF THE TENDERING COMMITTEE.
CHAIRMAN
(RAFIQUE AHMED..SMAIKH) EXECUTIVE ENGINEER
HIGHWAYS DIVISION SUKKUR
MEMBER MEMBER
(WAHEED BUX Q'ASMI) ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION ROHRI
(ABDUL HAFEEZ MEMON) — - ASSISTANT EN9NE
PUBLIC HEALTH ENGG: SUB-DIVISION ROHRI
The Lowest Rates Qouted By M/S MAHTAM ENTERPRISES Government Contractor are:-
PART "A" @ Rs. 7,60% Above (Rupees Seven Point Sixty Percent Above) PART "B" ij Rs, 16% Above (Rupees Sixteen Percent Above)
Lowest Rates are Recommended for Approval
(A) Total Cost as per Estimate 7110000 (B) Total as per Tender 6952248
Saving (A+B) 157752 Percentage Saving 2.22
A.A Amount 7120000 Lowest Tender Amount 6952248
Saving Over A.A 167752
FINACIAL REVIEW I COMPARA
4 I
NAME OF WORK: - CONSTRUCTION OF ROAD FROM KHUDA BUX MAHTAM ROAD TO GilL KHAN CHANDIO MILE 0/0-0/5.
SR NO
DESCRIPTION ESTIMATE
M/S MARTAM ENTERPRISES MIS SAAI) KROKHAR ENTERPRISES
RATE AMOUNT RATE AMOUNT
PART "A" (ROAD WORK
I Amount of Schedule 'B' 6460844 6460844 6460844
2 Add: 8% Above 516868 7,60% Above (+) 491024 8.63% Above (+) 557571
3 Ded: Dill Cost of Bitumen (-) 399222 399222 399222
PART "A" 6578490 6552646 6619193 PART B" (ROAD WORK
1 Amount of Schedule"B" 172242 172242 172242
2 Perimum --- 16% Above (+) 27559 17% Above (+) 29281
3 Add: Cartage of Material (4) 28992
PART "B"
X2
GRAND TOTAL A+B+C+D: -
201234
402468
6980958
x 2
199801
399602
6952248
x 2 =
201523
403046
7022239
ADD: CONTIGENCY (LUM-SUM) 129216
[(WAHEEOUXA1I J ASSIS'ANT EN. I1IGHWIYS SUB-P iO
ROHRI
EXECUTIVE Ne11QEER HIGHWAYS DIVISION (ABDUL HE)EMON1
ASSISTANT 1TGINEER PBIIiEAIEALTH ENGG: SUBIvSON
ROHRI
TENDER REFERENCE NO. N.I.T No. EE/HW-D/TC/ 503 Dated. 04.12.20 17
NAME OF PROCURING EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
NAME OF WORK CONSTRUCTION OF ROAD FROM KHUDA BUX MAHTAM ROAD TO GUL KHAN CHANDIO MILE 0/0-
0/5.
NAME OF FIRM/ BIDDERS N.T.N REGISTRATION
WITH P.E.0 SIIIDH BOARD OF REVENUE
RELEVANT EXPERIENCE
TURNOVER OF AT LEAST LAST THREE YEARS
FUNDS/ BUDGET
05% EARNEST
MONEY
TENDER FEEl COST BIDDING
DOCUMENT
I M/S MAI-ITAM ENTERPRISES Available Registered Registered Available Available Available Available l)cpositid
2 M/S SAAD KHOKHAR ENTERPRISES Available gistered Registered Avatiab AvdabIe Avwi.Ii Available Denosited
CHAIRMAN MEMBER MEMBER
(RAFIQUE AHMJ>SRAIKH) (WAHEED BUX QASMI) (ABDUL HAP MEMON) EXECUTENGINEER ASSISTANT ENGINEER ASSISTANT ENGINEER HIGHWAYS DIVISION HIGHWAYS SUB.DIVISION PUBLIC HEALTH ENGGtSUBDIVISION
SUKKUR ROHRI ROHRI
• FENDANCE SHEET OF PARTICIPATION IN TENDER PROCESS IN EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
• NAME OF WORK: - WIDEN: /RECDG OF ROAD FROM VILLAGE AL! WAHAN TO VILLAGE ARAIN SUKKUR MILE 0/0-1/0.
EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR HELD ON 22.12.2017
SR. NO.
NAME OF CONTRACTOR SIGNATURE
1 M/S RH & BROTHERS COMPANY &
I'rop:
2 M/SABDULSATTARARBANI&CO
CHAIRMAN
(RAFIQUE AHIj SHAIKH) EXECUTIVE ENGINEER HIGHWAYS DIVISION
SUKKUR
MEMBER MEMBER
(WAHEED BUX 1I) (ABDUL HAFEZ MEMON) ASSISTANT ENGINEER ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION PUBLIC HEALTH ENGG: SUB-DIVISION ROHRI ROHRI
0
lD EVALUTION REPORI
I Name of Procuring Agency Executive Engineer Highways Division Sukkur
2 Tender Reference No. N.1.T No. EE/HW-D/TC/ 503 Dated. 04.12.2017
3 Tender Description! Name of Work/ Item WIDEN: /RECDG OF ROAD FROM VILLAGE ALl WAHAN TO VILLAGE ARAIN SUKKUR MILE 0/0-1/0.
4 Method of Procurement Single Stage (By Competitive Rate/ Bid)
5 Tender Published Published In (i)Daily Awaini Awaz Karachi Dated. 07.12.20 17
(ii) Daily Express Karachi Dated. 07.12.2017 (iii) Daily Dawn Karachi Dated. 07.12.2017 (iv) Daily Sobh Karachi Dated. 07. 12.20 17
SPPRA ID NO:2 147483647 S.No. 35535 Dated: 05-12-2017
6 Total Document Sold 02 Nos.
7 Total Bids Received 02 Nos.
8 Technical Bid Opening Date (If Apolicablel
--
9 No of Bid Technically Qualified (If Applicable)
01 No.
(0 Bids Rejected 01 Nos.
11 Financial Bid Opening Date 22.12.2017
BID EVALUATION REPORT
COST RANKING IN COMPARISON REASONS FOR SR # NAME OF FIRM OF BIDDER OFFERED BY TERMS OF WITH ESTIMATE ACCEPTANCE/ REMARKS
THE BIDDER COST COST (SAVING) REJECTION
1 MIS RH & BROTHERS COMPANY
6259179 in Lowest 177695 Accepted Being Lowest
2 M/S ABDUL SATFAR ARBANI & CO
6319683 2nd Higher 117191 Rejected Being Higher
SIGNATURE OF THE TENDERING COMMITTEE.
CHAIRMAN
(RAFIQUE AHMED ThflKH) EXECUTIVEN1NEER
HIGHWAYS DIVISION SUKKUR
MEMBER
ML (WAHEED BUX QASMI) ASSISTANT ENGtNEER
HIGHWAYS SUB-DIVISION ROHRI
MEMBER
Th (ABDUL HAFEIMEMON) -
ASSISTANT ENGINEERT PUBLIC HEALTH ENGG SUB-DIVISION
ROHRI
29439 29741 29886 PART "C"
6259179 6319914 6319683 GRAND TOTAL A, B, C: -
116960 ADD: CONTIGENCY (LUM-SUM)
The Lowest Rates Qouted By MIS RH & BROTHERS COMPANY Government Contractor are:- 6436874 6259179
177695 2.76
6500000 6259179
240821
PART "A" (j Rs. 13% Above (Rupees Thirteen Percent Above) PART "B" @ Rs. 9.80°i Above (Rupees Nine Point Eighty Percent Above) PART "C" @ Rs. 12% Above (Rupees Twelve Percent Above)
(A) Total Cost as per Estimate (B) Total as per Tender
Saving (Ai-B) Percentage Saving
A.A Amount Lowest Tender Amount
Saving Over A.A
ION, EXECU E HIGHWAYS D
SU' R ABDULHAI ASSISTANT E
PUBLIC HEALTH FC SUB.DIV;SION 1<0 hR
Lowest Rates are Recommet'led for Aproval
I(WAHEED BUXJQASM) ASSISTANT Et4G)NEER t0HW-AS SUBDIVIS)ON
ROHRI
F1NNCIALRJVIEWJ COMPARI.JJVESTATEMNT
NAME OF WORK; - WIDEN: /RECDG OF ROAD FROM VILLAGE ALl WAHAN TO VILLAGE ARAIN SUKKUR MILE 0/0-1/0.
SR NO
ESTIMATE
M/S RH & BROTHERS COMPANY
RATE II AMOUNT
MIS ABDUL, SATTAR ARBANI & CO
RATE AMOUNT DESCRIPTION
PART "A" tROAD WORK
1 Amount of Schedule "B" 5848013 5848013 5848013
2 Add: 14 % Above )) 818722 13% Above (+) 760242 14% Above (+) 818722
3 Ded: Dill Cost of Bitumen )-) 567637 567637 567637
PART "A" 6099098 6040618 6099098 PART "B" (3' SPAN CULVERT)
I Amount of Schedule "B" 172242 1 72242 172242
2 Pcrmiuin -- 9.80% Above (+) 16880 10.80% Above (+) 18602
3 Add: Cartage of Material () 18688
PART "B" 190930 189122 190844 PART "C" (PIPE CULVERT
1 Amount of Schedule "B" 26285 26285 26285
2 Permium -- 12% Above ('9 3154 13.15% Above (+) 3456
3 Add: Cartage of Material ('9 3601
N.T.N ] RELEVANT
EXPERIENCE
TURNOVER OF AT LEAST LAST THREE YEARS
I 05% TENDER FEEl
EARNEST COST BIDDING MONEY DOCUMENT
SR. NO.
NAME OF FIRM/ BIDDERS REGISTRATION
WITH P.E.0 SINDH BOARD OF REVENUE
FUNDS/ BUDGET
TENDER REFERENCE NO.
NAME OF PROCURING
NAME OF WORK
!3IJ J UA LI TIRJ
N.I.T No. EE/HW-D/TC/ 503 Dated. 04.12.2017
EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
WIDEN: /RECDG OF ROAD FROM VILLAGE ALl WAHAN TO VILLAGE ARAIN SUKKUR MILE 0/0-1/0.
1 MIS RH & BROTHERS COMPANY \v,tcI.iIir I'gjsot Registered Available Available .vaiIah1e Available Deposited
2 M/S ABDUI. SATTAl ARI3ANI & CO Available Registered Registered \viilale Available AvaW,l,lc Avad,bl Deposited
CHAIRMAN MEMBER MEMBER
(RAFIQUE AHNED$HAIKH) EXECUTIVE E1GINEER HIGHWAYS DIVISION
SUKKUR
(WAHEED BUX QASMI) ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION ROHRI
(ABDUL HAFE - MEMON) ASSISTANT ENGINEER
PUBLIC HEALTH ENUG: SUB-DIVISION RORRI
ATTENDANCE SHEET OF PARTICIFATION IN TENDER PROCESS IN EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
NAME OF WORK: - CONSTRUCTION OF ROAD FROM ARRORE BACHAL SHAH ROAD TO LOUNG BHANBHRO MILE 0/0-0/54330'.
EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR HELD ON 22.12.2017
SR. NO.
NAME OF CONTRACTOR SIGNATURE
1 M/S PINE HILLS CONSTRUCTION GROUP
2 M/S BILAWAL CONSTRUCTION & CO
'I CHAIRMAN
(RAFIQUE AHMED$1AIKH)
EXECUTIVE EI(GINEER HIGHWAYS DIVISION
SUKKUR
MEMBER MEMBER
S
(WAHEEDBUX QASMI) ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION ROHRI
(ABDUL HAF EZ MEMON) ASSISTANT 9INEER
PUBLIC HEALTH ENGG: SUB-DIVISION ROHRI
ID EVALUTION REPORT
1 Name of Procuring Agency Executive Engineer Highways Division Sukkur
2 Tender Reference No. N.I.T No. EE/HW-D/TC/ 503 Dated. 04.12.2017
3 Tender Description/ Name of Work/ Item CONSTRUCTION OF ROAD FROM ARRORE BACHAL SHAH ROAD TO LOUNG BHANBHRO MILE 0/0-0/5~330.
4 Method of Procurement Single Stage (By Competitive Rate! Bid)
5 Tender Published Published in (l)Daily Awami Awaz Karachi Dated. 07. 12.20 17 (ii) Daily Express Karachi Dated. 07.12.2017 (iii) Daily Dawn Karachi Dated. 07.12.2017 (iv) Daily Sobh Karachi Datcd. 07.12.2017
SPPRA ID NO:2 147483647 S.No. 35535 Dated: 05-12-2017
6 Total Document Sold 02 Nos.
7 Total Bids Received 02 Nos.
8 Technical Bid Opening Date (If Aoolicable)
--
9 No of Bid Technically Qualified (If Applicable)
01 No.
10 Bids Rejected 01 Nos.
11 Financial Bid Opening Date 22.12.2017
BID EVALUATION REPORT
COST RANKING IN COMPARISON REASONS FOR SR # NAME OF FIRM OF BIDDER OFFERED BY TERMS OF WITH ESTIMATE ACCEPTANCE! REMARKS
THE BIDDER COST COST (SAVING) RLJECTION
1 MIS PINE HILLS CONSTRUCTION GROUP
6052862 i' Lowest 46138 Accepted Being Lowest
2 M/S BILAWAL CONSTRUCTION & CO
6103194 2nd Higher -4194 Rejected Being Higher
SIGNATURE OF THE TENDERING COMMITTEE.
CHAIRMAN
(RAFIQUE AHMEDRAIKH) EXECUTIVE ENINEER
HIGHWAYS DIVISION SUKKUR
MEMBER
(WAHEED BUX QASMI) ASSISTANT ENGINER
HIGHWAYS SUB-DIVPION ROHRI
MEMBER
(ABDUL HAFEEZ MEMON) ASSISTANT ENGINEER
PUBLIC HEALTH ENGG: SUB-DIVISION ROHRI
(A) Total Cost as per Estimate (B) Total as per Tender
Saving (A+B) Percentage Saving
A.A Amount Lowest Tender Amount
Saving Over A,A
6099000 6052862
46138 0.76
6100000 6052862
47138
(ABDIJL HAFEZ ASStSTANT Efi4EER
PUBLIC HEALTH ENGG: SU6OI VISION -- Rutflcl
FINANCIAL REVIEW I COMPAATIVESI'ATEMINT
NAME OF WORK: - CONSTRUCTION OF ROAD FROM ARRORE BACHAL SHAH ROAD TO LOUNG BHANBHRO MILE 0/0- 0/5~330.
SR NO
DESCRIPTION ESTIMATE
M/S PINE HILLS CONSTRUCTION GROUP (MIS BILAWAL CONSTRUCTION & Co
L_______________ RATE J AMOUNT RATE 1 AMOUNT
PART "A" (ROAD WORK
1 Amount of Schedule"13" 2935717 2935717 2935717
2 Add: 8% Above (-) 234857 7.40% Above (+) 217243 83O'o Above (+) 243665
3 Ded: Diff Cost of Bitumen (-) 199611 199611 199611 PART "A" 2970963 2953349 2979771
PART "B (ROAD WORK 1 Amount of Schedule "B" 2744037 2744037 2744037 2 Add: 14% Above (+) 384165 13.40% Above (+) 367701 14.20% Above (+) 389653 3 Ded: Diff Cost of Bitumen (-) 239624 239624 239624
PART "B" 2888578 2872114 2894066 PART c (3 SPAN CULVERTS)
I Amount of Schedule"B" 172242 172242 172242
2 Permium -- 14% Above (+) 24114 15% Above (4) 25836
3 Add: Cartage of Material (+) 25957 PART "C' 198199 196356 198078
PART "D" (PIPE CULVERTS
1 Amount of Schedule "B" 26285 26285 26285
2 Permiuzn -- 18.10% Above (+) 4758 19% Above (+) 4994
3 Add: Cartage of Material 4926 PART "D" 31211 31043 31279
GRAND TOTAL A+B+C+D: - 6088951 6052862 6103194
ADD: CONTIGENCY (LUM-SUM) 10000
The Lowest Rates Qouted By MIS PINE HILLS CONSTRACTION GROUP Government Contractor are:-
PART "A" @ Rs. 7.40% Above (Rupees Seven Point Forty Percent Above) PART "B" @ Rs. 13.40% Above (Rupees Thirteen Point Forty Percent Above) PART "C" ( Rs. 14% Above (Rupees Fourteen Percent Above) PART "D" ® Rs. 18,10% Above (Rupees Eighteen Point Ten Percent Above) Lowest Rates are Recommended for Approval
(WAHEED BUX cASM' ASSISTANT ENGiNEE"
J-ILGHWAYS SUB-DIVLSION
EXECUTIVE EN4NER HIGH WAYS-tILVISION
SUKKUR
0
TENDER REFERENCE NO.
NAME OF PROCURING
NAME OF WORK
I'IArIQ?
N.I.T No. EE/HW-D/TC/ 503 Dated. 04.12.20 17
EXECUTIVE ENGINEER HIGHWAYS DIVISION SURKUR
CONSTRUCTION OF ROAD FROM ARRORE BACHAL SHAH ROAD TO LOUNG BHANBHRO MILE 0/0-0/5+330'.
SR. NO. NAME OF FERMI BIDDERS N.T.N
REGISTRATION WITH P.E.0
SINDH BOARD OF REVENUE
RELEVANT EXPERIENCE
TURNOVER OF AT LEAST LAST THREE YEARS
BUDGET
05% EARNEST
MONEY
TENDER FEEl COST BIDDING
DOCUMENT
1 MIS PINE HILLS CONSTRUCTION
GROUP
Available Registered Registered Available Available Available Available Deposited
2 MIS BILAWAL CONSTRUCTION & CO Available Registered Registered Available Available Available Available Deposited
CHAIRMAN MEMBER MEMBER
(RAFIQUE AHMD.-SNA'1KE) EXECUTIVE ENGINEER HIGHWAYS DIVISION
SUKKUR
(WAHEED BUX QASMI) ASSISTANT ENGINER
HIGHWAYS SUB-DIVISION RORRI
E ' (ABDUL HAF Z MEMON) ASSISTANT ENGINEER
PUBLIC HEALTH ENGGiSUB-DWISION ROHRI
ATTENDANCE SHEET OF PARTICIPATION IN TENDER PROCESS IN EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
NAME OF WORK: - CONSTRUCTION OF ROAD ON CANAL INSPECTION PATH AT VILLAGE BHAI KHAN GHANGHRO UC TAMCHANI MILE 0/0-0/3 (0.60 KM).
EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR HELD ON 22. 12.2017
SR. NO.
NAME OF CONTRACTOR SIGNATURE
1 M/S S.A MUNAM ENTERPRISES
gi's'
2 MIS HASSAN & SONS CONSTRUCTION
3 M/SZAWARBHAMBHRO&CO /
CHAIRMAN
(RAFIQUE AHM3SHAIKH)
EXECUTIy(ENGINEER
HIGHWAYS DIVISION
SUKKUR
MEMBER
I i1M 2
MEMBER
(WAHEED BUX QASMI) ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION ROHRI
(ABDUL HAFEEZ MEMON) ASSISTANT ENGINEER
PUBLIC HEALTH ENGG: SUB-DIVISION
ROHRI
ID EVALUTION REPORT
1 Name of Procuring Agency Executive Engineer Highways Division Sukkur
2 Tender Reference No. N.I.T No. EE/HW-D/TC/ 503 Dated. 04.12.2017
3 Tender Description! Name of Work! Item CONSTRUCTION OF ROAD ON CANAL INSPECTION PATH AT VILLAGE BHAI KHAN GHANGHRO UC TAMCHANI MILE 0/0-0/3 (0.60 KM).
4 Method of Procurement Single Stage (By Competitive Rate! Bid)
5 Tender Published Published in (1)Daily Awami Awaz Karachi Dated. 07.12.20 17
(H) Daily Express Karachi Dated. 07.12.2017 (Il) Daily Dawn Karachi Dated. 07.12.2017 (iv) Daily Sobh Karachi Dated. 07.12.2017
SPPRA ID NO:2 147483647 S.No. 35535 Dated: 05-12-20 17
6 Total Document Sold 03 Nos.
7 Total Bids Received 03 Nos.
8 Technical Bid Opening Date (If Aoolicable)
--
9 No of Bid Technically Qualified (If Applicable)
01 No.
10 Bids Rejected 02 Nos.
11 Financial Bid Opening Date 22.12.20 17
BID EVALUATION REPORT
COST RANKING IN COMPARISON REASONS FOR SR # NAME OF FIRM OF BIDDER OFFERED BY TERMS OF WITH ESTIMATE ACCEPTANCE/ REMARKS
THE BIDDER COST COST (SAVING) 1 REJECTION
1 5952849 i' Lowest 46151 Accepted Being Lowest
2 6010186 2nd Higher -11186 Rejected Being Higher
3 6102198 3 Highest -103198 Rejected Being Highest
SIGNATURE OF THE TENDERING COMMITTEE.
CHAIRMAN
(RAFIQUE AHMED 5HAIKH) EXECUTIVEENtINEER
HIGHWAYS DIVISION SUKKUR
MEMBER MEMBER
\,4' E\. _)' '-
(WAHEED BUX QA1SMI) ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION ROHRI
(ABDUL HAFEEZ MEMON) ASSISTANT ENGINEER
PUBLIC HEALTH EN(G: SUB-DIVISION ROHRI
M/S ZAWAR BIIAMBHRO & CO
RATE AMOUNT
1'he Lowest Rates Qouted By M/S S.A MUNAM ENTERPRISES Government Contractor are:-
PART "A" @ Rs. 7.20% Above (Rupees Seven Point Twenty Percent Above) PART "B" @ Rs. 11% Above (Rupees Eleven Percent Above)
Lowest Rates are Recommended for Approval
(A) Total Cost as per Estimate (B) Total as per Tender
Saving (A+B) Percentage Saving
A.A Amount Lowest Tender Amount
Saving Over A.A
5999000 5952849
46151 0.77
6000000 5952849
47151
PART "B" 589179 585594 591555 602001
GRAND TOTAL A+B+C: - 5998805 5952849 6010186 6102198
ADD: CONTIGENCY (LUM-SUM) 0
(ABDUL HAFEE ASSISTANT
PUBL(C HEALTH EGG....... "''- ROHRL
4G' pssts. s sUB.0tt GNP'
FINANCIAL REVIEW / COMPARATWE STATEMNT
NAME OF WORK: - CONSTRUCTION OF ROAD ON CANAL INSPECTION PATH AT VILLAGE BHAI KHAN GHANGHRO UC TAMCHANI MILE 0/0-0/3 (0.60 1CM).
SR NO
DESCRIPTION ESTIMATE
M/S S.A MUNAM ENTERPRISES
RATE .1
MIS RASSAN & SONS CONSTRUCTION
AMOUNT RATE AMOUNT
PART "A" (ROAD WORK
1 Amount of Schedule"B" 5296511 5296511 5296511 5296511
2 Add: 8% Above (+) 423720 7.20% Above (+) 381349 8.17% Above (~) 432725 9.71% Above (+) 514291
3 Ded:DiffCostofBitumen () 310605 310605 310605 310605
PART "A" 5409626 5367255 5418631 5500197 PART "B 16 SPAN CTJLVERTS
1 Amount of Schedule"B" 527562 527562 527562 527562
2 Fermium -- 11% Above (+) 58032 12.13% Above (+) 63993 14.11% Above (+) 74439
3 Add: Cartage of Material (+) 61617
EXECUTIVEI4TNEER \ HIGHWAYS DIVS1ON
SIJKKUR
QT.IF'IcA?EION
N.I.T No. EE/HW-D/TC/ 503 Dated. 04.12.2017
EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
CONSTRUCTION OF ROAD ON CANAL INSPECTION PATH AT VILLAGE BHAI KHAN GHANGHRO UC TAMCHANI MILE 0/0-0/3 (0.60 KM).
TENDER REFERENCE NO.
NAME OF PROCURING
NAME OF WORK
SR. NAME OF FIRM! BIDDERS N.T.N REGISTRATION SINDH BOARD RELEVANT
EXPERIENCE
TURNOVER OF AT LEAST
05% EARNEST
TENDER FEE/ COST BIDDING
NO. WITH P.E.0 OF REVENUE THREE BUDGET MONEY DOCUMENT
I
I M/S S.A MUNAM ENTERPRISES Available Registered Registered Available Available Available Available Deposited
2 MIS HASSAN & SONS CONSTRUCTION
Available Registered Registered Available Available Available Available Deposited
3 MIS ZAWAR BHAMI3IIRO & CO Available Registered Registered Available Available Available Available Deposited
CHAIRMAN
(RAFIQUE AHME EXECUT1VEINGINEER HIGHWAYS DIVISION
SUKKUR
MEMBER
(WAHEED BUX QASMI) ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION ROHRI
MEMBER
(ABDUL RAFEZ MEMON) ASSISTANT ENGINEER
PUBLIC HEALTH ENGG: SUB-DIVISION ROHRI
ATTENDANCE SHEET OF PARTICIPATION IN TENDER PROCESS IN EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
NAME OF WORK: - CONSTRUCTION OF PAVER BLOCK FLOORING & DRAINS AT VILLAGE ALLAH BUX JAMALI (REMAINING WORK).
EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR HELD ON 22. 12.20 17
SR. NO.
NAME OF CONTRACTOR SIGNATURE
1 MIS ASIF BALOCH & COMPANY
2 M/S GHULAM ALl SOOMRO
3 M/S MUHAMMAD SIDDIQUE SHUJRAH
CHAIRMAN
(RAFIQUE AHI SHAIKH)
EXECUTIVE ENGINEER HIGHWAYS DIVISION
SUKKUR
MEMBER MEMBER
/ (ABDUL HAFEE(EMON)
ASSISTANT E1GINEER PUBLIC HEALTH ENGG: SUB-DIVISION
ROHRI
(WAHEED BUX QASMI) ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION ROHRI
ID EVAL.UTION REPORT 5K-Oil
I Name of Procuring Agency Executive Engineer Highways Division Sukkur
2 Tender Reference No. N.1.T No. EE/HW-D/TC/ 503 Dated. 04.12.2017
3 Tender Description/ Name of Work/ Item CONSTRUCTION OF PAVER BLOCK FLOORING & DRAINS AT VILLAGE ALLAH BUX JAMALI (REMAINING WORK).
4 Method of Procurement Single Stage (By Competitive Rate! I3id)
5 Tender Published Published in (l)Daily Awamj Awaz Karachi Dated. 07. 12.20 17 (ii) Daily Express Karachi Dated. 07.12.2017 (iii) Daily Dawn Karachi Dated. 07.12.2017 (iv) Daily Sobh Karachi Dated. 07. 12.20 17
SPPRA ID NO:2 147483647 S.No. 35535 Dated: 05-12-20 17
6 Total Document Sold 03 Nos.
7 Total Bids Received 03 Nos.
8 Technical Bid Opening Date (If Arrnlicablel
--
9 No of Bid Technically Qualified (If Applicable)
01 No.
10 Bids Rejected 02 Nos.
11 Financial Bid Opening Date 22.12.2017
BID EVALUATION REPORT
SR # NAME OF FIRM OF BIDDER COST
OFFERED BY RANKING IN TERMS OF
COMPARISON WITH
REASONS FOR ACCEPTANCE/ REMARKS
THE BIDDER COST ESTIMATE REJECTION
COST
1 MIS ASIF BALOCH & COMPANY
4066032 lt Lowest 102968 Accepted Being Lowest
2 MIS GHULAM ALl SOOMRO 4098080 2t Higher 70920 Rejected Being Higher
3 MIS MUHAMMAD SIDDIQUE SHUJRAH
4126121 3rd Highest 42879 Rejected Being Highest
SIGNATURE OF THE TENDERING COMMITTEE.
CHAIRMAN
4d (RAFIQUE AHME-81AIKH)
EXECUTIVE ENGINEER HIGHWAYS DIVISION
SUKKUR
MEMBER MEMBER
(WAHEED BUX QASMI) ASSISTANT ENGiNEER
HIGHWAYS SUB-DIVISION ROHRI
(ABDUL HAF EZ MEMON) ASSISTANT EN9INEER
PUBLIC HEALTH ENGG: SUB-DIVISION ROHRI
M/S ASIF BALOCH & COMPANY M/S GHULAM ALt SOOMRO SIDDIQZJ ESTIMATE DESCRIPTION
SR NO
MIS MUHAMMAD SHUJRA}1
AMOUNT AMOUNT AMOUNT RATE RATE RATE
(A) Total Cost as per Estimate (B) Total as per Tender
Saving (A+B) Percentage Saving
A.A Amount Lowest Tender Amount
Saving Over A.A
4169000 4066032
102968 2.47
4200000 4066032
133968
(ABDULHAF E ASSISTANT E' INEER
PUBLIC HEALTH ENGO: SUB.DIVISION ROHRI
(WAHEED BUX ASMI) ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION ROHRI
NAME OF WORK: -
EINANCIALREWEW JOMPARATIVE STATEMNT
SR-oil CONSTRUCTION OF PAVER BLOCK FLOORING & DRAINS AT VILLAGE ALLAH BUX JAMALI (REMAINING WORK).
PART "A" ROAD WORK
1 Amount of Schedule "B" 4005943 4005943 4005943 4005943
2 Dccl: 20% Below (on Paver Block Only) n Rs. 2947606/-
589521 1.50% Above (+) 60089 2.30% Above (+) 92137 3% Above (+) 120178
3 Add: cartageofMaterial (+) 671981
GRAND TOTAL A, B, C: - 4088403 4066032 4098080 4126121
ADD: CONTIGENCY (LUM-SUM) 80118
The Lowest Rates Qouted By ASIF ALl Government Contractor are:-
Part "A" @ Rs. 1,50% Above (Rupees One Point Fifty Percent Above)
Lowest Rates are Recommended for Approval
EXECUTIVE ENGINiR HIGH WAY,J~tcJ1SION
S U icR U R
4
TENDER REFERENCE NO.
NAME OF PROCURING
NAME OF WORK
___IIA'rIJ
N.I.T No. EE/HW-D/TC/ 503 Dated. 04.12.20 17
EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
CONSTRUCTION OF PAVER BLOCK FLOORING & DRAINS AT VILLAGE ALLAH BUX JAMAL! (REMAINING WORK).
SR. NO. NAME OF FIRM/ BIDDERS N.T.N REGISTRATION
WITH P.E.0 SINDH BOARD OF REVENUE
RELEVANT EXPERIENCE
TURNOVER OF AT LEAST LAST THREE
FUNDS/ BUDGET
05% EARNEST
MONEY
TENDER FEE! COST BIDDING
DOCUMENT
I MIS ASIF BALOCH & COMPANY Available Registered Registered Available Available Available Available Deposiled
2 M/S (IIIULAM AU SOOMRO Available Registered Registered Available Available Available Available Deposited
3 MIS MUHAMMAD SIDDIQUE SHUJRAH
Available Registered Registered Available Available Available Available Deposited
CHAIRMAN MEMBER MEMBER
(RAFIQUE AHMEJ)-8HAIKH) EXECUTIVENGINEER HIGHWAYS DIVISION
SUKKUR
(WAHEED BUX QASMI) ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION ROHRI
(ABDTJL HAF Z MEMON) ASSISTANT ENGINEER
PUBLIC HEALTH ENGGi SUB-DIVISION ROHRI
ATTENDANCE SHEET OF PARTICIPATION IN TENDER PROCESS IN EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
NAME OF WORK: - Construction of road village Khahi uc Pir Ikhlas Shah
EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR HELD ON 22.12.2017
SR. NO.
NAME OF CONTRACTOR SIGNATURE
1 M/SAIJAZALI
M/S Aijai Au Govt: Contrt
2 M/S MUHAMMAD MALOOK KATO
CHAIRMAN
(RAFIQUE AHMEBHAIKH) EXECUTIVE ENGINEER
HIGHWAYS DIVISION SUKKUR
MEMBER MEMBER
\J¼ C ,vw' — (WAHEED BUX QASMI) ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION ROHRI
(ABDUL HAFEEZ MEMON) ASSISTANT ENGINEER
PUBLIC HEALTH ENGG: SUB-DIVISION ROHRI
JQELALUTLON REPORT
I Name of Procuring Agency Executive Engineer Highways Division Sukkur
2 Tender Reference No. N.1.T No. EE/HW-D/TC/ 503 Dated. 04.12.20 17
3 Tender Description! Name of Work! Item Construction of road village Khahi uc Pir Ikhlas Shah
4 Method of Procurement Single Stage (By Competitive Rate! Bid)
5 Tender Published Published in (i)Daily Awami Awaz Karachi Dated. 07. 12.2017 (ii) Daily Express Karachi Dated. 07.12.20 17 (iii) Daily Dawn Karachi Dated. 07.12.2017 (iv) Daily Sobh Karachi Dated. 07.12.2017
SPPRA ID NO:2 147483647 S.No. 35535 Dated: 05-12-2017
5 Total Document Sold 02 Nos.
7 Total Bids Received 02 Nos.
8 Technical Bid Opening Date (If Applicable)
--
9 No of Bid Technically Qualified (If Applicable)
01 No.
10 Bids Rejected 01 Nos.
11 Financial Bid Opening Date 22.12.2017
BID EVALUATION REPORT
COST RANKING IN COMPARISON REASONS FOR SR # NAME OF FIRM OF BIDDER OFFERED BY TERMS OF WITH ESTIMATE ACCEPTANCE! REMARKS
THE BIDDER COST COST (SAVING) REJECTION
1 M/SAIJAZALI 5248625 1st Lowest 65374 Accepted Being Lowest
2 M/S MUHAMMAD MALOOI< KATO
5285139 2 Higher 28861 Rejected Being Higher
SIGNATURE OF THE TENDERING COMMITTEE.
CHAIRMAN
(RAFIQUE AHjD-sflAIKH) EXECUTIVE ENGINEER
HIGHWAYS DIVISION SUKKUR
MEMBER MEMBER
(ABDUL HAFEEZ MEMON) ASSISTANT ENGINEER
PUBLIC HEALTH ENGG: SUB-DIVISION ROHRI
(WAHEED BUX QSMI) ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION ROHRI
The Lowest Rates Qouted By MIS AIJAZ ALl Government Contractor are:-
PART "A" (j Rs. 7.50% Above (Rupees Seven Point Fifty Percent Above) PART 'B" RS. 13.50% Above (Rupees Thirteen Point Fifty Percent Above) PART "C" @ Rs. 13% Above (Rupees Thirteen Percent Above)
Lowest Rates are Recommended for /*,proval
(A) Total Cost as per Estimate (B) Total as per Tender
Saving (A~B) Percentage Saving
A.A Amount Lowest Tender Amount
Saving Over A.A
5314000 5248626
65374 1.23
5317000 5248626
68374
PART "C" 195706 194633 196356 Therefor 2 x 391412 x 2 = 389266 x 2 392712
GRAND TOTAL A+B+C: - 5273939 5248626 5285139
ADD: CONTIGENCY (LUM-SUM) 40001
ABDULHA EE 'EM ASSISTANTE lEER
FUBLIC HEPITH ENGG: SUB.UIVISION ROHR%
EXECUTIVE E81ER -
HIGHWS"DIVSLOJ HVM)
FINANCIAL REVIEW 1 COMPARATWE STATEMNT
NAME OF WORK: - Construction of road village Khahi uc Pir Ikh1as Shah
NO
-
DESCRIPTION ESTIMATE MIS AIJAZ ALl MIS MUHAMMAD MALOOK KATO
RATE AMOUNT RATE AMOUNT
PART A (ROAD WORK
1 Amount of Schedule "B" 2000065 2000065 2000065
2 Add: 8 % Above (+) 160005 7.50% Above (+) 150005 8.10% Above (+) 162005
3 Ded:DiffCostofBitumen (-) 119812 119812 119812 PART "A" 2040258 2030258 2042258
PART "B" (ROAD WORK
1 Amount of Schedule "B" 2633415 2633415 2633415
2 Add: 14 % Above (+) 368678 13.50% Above (+) 355511 14.30% Above (+) 376578
3 Ded: Duff Cost of Bitumen (-) 159824 159824 159824 PART "B" 2842269 2829102 2850169
PART "C" 13' SPA( CULVERTS 1 Amount of Schedule "B" 172242 172242 172242 2 Permium -- 13% Above (+) 22391 14% Above (+) 24114 3 Add: Cartage of Material () 23464 -
(WAHEE P
(twsvO"
SR. NO. NAME OF FIRM! BIDDERS N.T.N
REGISTRATION WITH P.E.0
SINDH BOARD RELEVANT OF REVENUE I EXPERIENCE
TURNOVER OF AT LEAST LAST THREE YEARS
TENDER FEE/ COST BIDDING
DOCUMENT
FUNDS/ BUDGET
05% EARNEST
MONEY
A V
TENDER REFERENCE NO. N.I.T No. EE/}IW-D/TC/ 503 Dated. 04.12.20 17
NAME OF PROCURING EXECUTIVE ENGINEER HIGHWAYS DIVISION StJXKUR
NAME OF WORK Construction of road village Khahi uc Pir Ikh1as Shah
1 M/S AIJAZ ALl Available Registered Registered Available Available Available Available Deposited
2 MIS MUHAMMAD MALOOK KATO Available Registered Registered Available Available Available Available Deposited
CHAIRMAN MEMBER MEMBER
/ (RAFIQUE AHMEJ)-SHAIKH) (WAHEED BUX QAS I) (ABDUL HAI4 MEMON)
EXECUTIViGINEER ASSISTANT ENGINEER ASSISTANT ENGINEER HIGHWYS DIVISION HIGHWAYS SUB-DIVISION PUBLIC HEALTH ZNG: SUB-DIVISION
SUKKUR ROHRI ROHRI
SR. NO.
SIGNATURE NAME OF CONTRACTOR
MEMBER MEMBER
TENDANCE SHEET OF PARTICIPATION IN TENDER PROCESS IN EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
NAME OF WORK: - CONSTRUCTION OF ROAD PAVER FLOORING & DRAINAGE AT VILLAGE SILAHI CHACHAR GHULAM ALl MAHESAR AMIR KHAN ARBANI MIR KHAN KHOSO QAIM JISKANI VARIOUS STREET UC PANO GHULAM ALL
EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR HELD ON 22.12.2017
1 M/S HAMADULLAH ABBASI
riAMA LLA (OVT cOTP
2 M/S MAJID GULZAR SHAIKH
4. 3 M/S BLUE STONE ASSOCIATE
('I,
CHAIRMAN
(RAFIQUE AHMJSHAIKH) EXECUTIVENGINEER
HIGHWAYS DIVISION SUKKUR
(WAHEED BUX QASMI) ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION ROHRI
(ABDUL HAFEEZMEMON) ASSISTANT F1iNEER
PUBLIC HEALTH ENGG: SUB-DIVISION ROHRI
MEMBER
(ABDUL HAFEZ)IEMON) ASSISTANT ENGINEER
PUBLIC HEALTH ENGG: SUB-DIVISION ROHRI
LD EVALUTION REPORT SK-081
1 Name of Procuring Agency Executive Engineer Highways Division Sukkur
2 Tender Reference No. N.I.TNo. EE/HW-D/TC/ 503 Dated. 04.12.2017
3 Tender Description/ Name of Work! Item CONSTRUCTION OF ROAD PAVER FLOORING & DRAINAGE AT VILLAGE SILAHI CHACHAR GRULAM ALl MAHESAR AMIR KHAN ARBANI MIR KHAN KHOSO QAIM JISKANI VARIOUS STREET UC PANO GHULAM ALl.
4 Method of Procurement Single Stage (By Competitive Rate! Bid)
5 Tender Published Published In (i)Daily Awami Awaz Karachi Dated. 07. 12.2017
(ii) Daily Express Karachi Dated. 07.12.20 17 (iii) Daily Dawn Karachi Dated. 07.12.2017 (lv) Daily Sobh Karachi Dated. 07. 12.20 17
SPPRA ID NO:2147483647 S.No. 35535 Dated: 05-12-2017
6 Total Document Sold 03 Nos.
7 Total Bids Received 03 Nos.
8 Technical Bid Opening Date (If Applicable)
--
9 No of Bid Technically Qualified (If Applicable)
01 No.
10 Bids Rejected 02 Nos.
11 Financial Bid Opening Date 22.12.2017
BID EVALUATION REPORT
COST RANKING IN COMPARISON REASONS FOR SR it NAME OF FIRM OF BIDDER OFFERED BY TERMS OF WITH ESTIMATE ACCEPTANCE/ REMARKS
THE BIDDER COST COST (SAVING) REJECTION
1 M/S HAMADULLAH ABBASI 4415322 1st Lowest 76680 Accepted Being Lowest
2 M/S MAJID GULZAR SHAIKH
4458021 2 Higher 33981 Rejected Being Higher
3 M/S BLUE STONE ASSOCIATE
4506718 3 Highest -14716 Rejected Being Highest
SIGNATURE OF THE TENDERING COMMITTEE.
CHAIRMAN
(RAFIQUE AHMEDfiAIKH) EXECUTIVLEI1INEER
HIGHWAYS DIVISION SUKKUR
MEMBER
(WAHEED BUX tASMI) ASSISTANT ENINEER
HIGHWAYS SUB-DIVISION ROHRI
*
EXECUT1VEEN1NR4 HIGHWAYS DIVISION
SUKKUR I'
ABDUL HAFE ASSSTANTE
PUBLiC riEAL1H ENGG: UB'DIVISION ROHRI
i tHEE.D B4J.XQASMI)l ASSISTANT E'4GINEER
HIGHWAYS SUB-DIVISIO ROHRI
b
C F FINANCIAL REVIEW I COMPARATWE STATEMNT
SK-081 NAME OF WORK: - CONSTRUCTION OF ROAD PAVER FLOORING & DRAINAGE AT VILLAGE SILAHI CHACHAR GHULAM AL!
MAHESAR AMIR KHAN ARBANI MIR KHAN KHOSO QAIM JISKANI VARIOUS STREET UC PANO GHULAM ALl.
ISR NO
DESCRIPTION ESTIMATE M/S HAMADULLAR ABBASI MIS MAJID GULZAR SHAIKH
]
i7S BLUE STONE ASSOCIATE
RATE AMOUNT RATE AMOUNT [] RATE AMOUNT
PART "A' (PAVER BLOCK
1 AmountofSchedule"B' 3670177 3670177 3670177 3670177
2 Ded: 20% Below (on Paver Block Only) n Rs. 3048490/-
609698 2% Above (+) 73404 3% Above (+) 110105 4% Above (+) 146807
3 Add: Cartage of Material (-) 721521
PART "A" 3782000 3743581 3780282 3816984 PART "B" (MASONARY STRUCTURE
1 Amount of Schedule "B" 599769 599769 599769 599769
2 Perinium -- 12% Above (+) 71972 13% Above (+) 77970 15% Above (+) 89965
3 Add: Cartage of Material (-!-) 73532 -
PART "B" 673301 671741 677739 689734
GRAND TOTAL A, B: - 4455301 4415322 4458021 4506718
ADD: CONTIGENCY (LUM-SUM) 36701
The Lowest Rates Qoured By MiS HAMADULLAH ABBASI Government Contractor are:-
PART "A" @ Rs. 2% Above (Rupees Two Percent Above) PART "B" @ Rs. 12% Above (Rupees Twelve Percent Above)
Lowest Rates are Recommended for Approval
(A) Total Cost as per Estimate 4492002 (B) Total as per Tender 4415322
Saving (A~B) 76680 Percentage Saving 1.71
A.A Amount 4500000 Lowest Tender Amount 4415322
Saving Over A.A 84678
TENDER REFERENCE NO.
NAME OF PROCURING
NAME OF WORK
1 P.
Q i'i'riw N.LT No. EE/HW-D/TC/ 503 Dated. 04.12.20 17
EXECUTIVE ENGINEER HIGHWAYS DIVISION SUKKUR
CONSTRUCTION OF ROAD PAVER FLOORING & DRAINAGE AT VILLAGE SILAHI CHACHAR GHULAM AL! MAHESAR AMIR KHAN ARBANI MIR KHAN KHOSO QAIM JISKANI VARIOUS STREET UC PANO GHULAM AL!.
SR. NO.
NAME OF FIRM/ BIDDERS N.T.N REGISTRATION
WITH P.E.0 SINDH BOARD OF' REVENUE
RELEVANT EXPERIENCE
TURNOVER OF AT LEAST LAST
FUNDS! BUDGET
05% EARNEST
TENDER FEE! COST BIDDING
THREE YEARS MONEY DOCUMENT
I M/S HAMADULLAH AB13AS1 Available Registered Registered Available Available Available Available Deposited
2 MIS MAJID GULZAR SHAIKH Available Registered Registered Available Available Available Available Deposited
3 MIS BLUE STONE ASSOCIATE Available Registered Registered Available Available Available Available Deposited
CHAIRMAN MEMBER MEMBER
/
(ABDIJL HAP EZ MEMON) ASSISTANT ENGINEER
PUBLIC HEALTH ENGO: SUB-DIVISION ROHRI
(RAFIQUE AHE-SHAIKH) EXECUTIVE ENGINEER HIGHWAYS DIVISION
SUKKUR
(WAHEE1) BUX QASMI) ASSISTANT ENGINEER
HIGHWAYS SUB-DIVISION ROHRI